Backup Material
Oconee County · Oconee County · meeting of Jul 22, 2024 · Other
Open the original document More from Oconee County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
BOARD MEMBERS
James Henderson, District I Bill Gilster, District III
Gwen Fowler, District II Thomas James, District IV
John Eagar, Chairman, At-Large Tim Mays, District V
Bill Decker, At-Large
Meeting agenda
Monday July 22 6:00pm
1. Call to order
2. Approval of minutes: 06.24.24
3. Brief statement about rules and procedures
4. Special Exemption application: #SE24-000001 for new
communications tower.
Variance application: #VA24-000010 Duke Power Co. is
requesting a 60-foot increase to the 250-foot
Industrial/agricultural height restriction for cell towers. TMS
137-00-01-001 with an address of 7805 Rochester Hwy
Seneca SC 29672. Ref. Sec. 32-136
5. ***This application was withdrawn from the 07/22/24 Agenda***
Variance application: #VA24-000011 Jim Anthony of Falls Park Subdivision is seeking relief
from the 100-foot minimum between a curve and intersecting road right of way. TMS 039-00-
01-014 with an address of 105 Jocassee Landing Dr. Salem SC 29676 Ref. Sec. 26-3 (e) (3)
6. Variance application: #VA24-000012 Devin Moeser is requesting a 6-foot variance to the front
setback. TMS 271-01-01-137 with an address of 34 Ulster Dr. Seneca SC 29678. Ref. Sec.
38-10.2
7. Adjourn
Oconee County
Board of Zoning
Appeals
Council Chambers
415 South Pine Street
Walhalla, S.C. 29691
www.oconeesc.com
YouTube: “YourOconee”
Staff contact
846-638-4218
planninginfo@oconeesc.com
Minutes
6:00 PM – June 24, 2024
Members in Attendance
Will Decker – At Large Bill Gilster – District 3
Tim Mays – District 5
John Eagar – At Large
Thomas James – District 4
Members Absent
Jim Henderson – District 1
Gwen Fowler -District 2
Staff
James Coley
Logan Gibbons
ITEM 1 – Call to Order – Mr. Eagar called the meeting to order at 6:00 PM.
ITEM 2 – Motion to approve the minutes from February 26, 2024 – Mr. Gilster made
a motion to approve the minutes; seconded by Mr. James. Mr. Eagar called for a vote.
The motion passed 5/0/0
ITEM 3 – Brief statement about rules and procedures – Mr. Eagar outlined the
proceedings of the meeting going forward:
Applicant will provide a presentation to state their request (5 minutes).
Staff will be asked to make any comments regarding the request.
The public is allowed to voice their approval or opposition to the proposed.
Please do not repeat opinions that have already been stated into the record (3-5
minutes).
Applicant rebuttal
Board members will discuss in detail.
Voting
ITEM 4. Variance application ##VA24-000009 Louise McKirgan is requesting a 10-
foot variance to the front setback for an existing garage. TMS 286-00-01-046 with
an address of 308 Knox Cove Rd. Westminster SC 29693.
*During Presentation the Variance application was amended to be increased to
24ft. Details below.
Applicant Comments:
Stated Name: Louise and Charles McKirgan.
Ms. McKirgan explained that when they had just moved to the property they had hired
professional contractors to build the pole barn. They had trusted that the contractors
would pull the necessary permits required and adhere to local ordinances correctly.
Ms. McKirgan stated that the pole barn was 14ft from the road.
Mr. McKirgan explained that he believed he couldn’t do that and staked out his property
line and moved the structure just inside the line, without knowledge of setback
requirements.
Ms. McKirgan explained that the structure surroundings are neat and clean, and do not
interfere with the road.
Staff comments:
Mr. Coley pointed out that the reason for this variance is that someone had made a
complaint against this property and that the code enforcement officers and confirmed
that a violation had been committed. The need for the variance was to remedy that
violation. A building permit would still be required to be applied for after the variance
ruling if granted.
Public comment:
1. Stated Name: Michelle Pointer
a. Ms. Pointer first stated that the garage referenced by Mr. Eagar is actually
just a carport
b. Ms. Pointer explained that the neighborhood road is a low use, low speed
road that would not pose an increased danger by having the McKirgan’s
garage there.
c. Ms. Pointer stated she agrees the variance should be given.
2. Stated Name: Jonathan Nation
a. Mr. Nation stated that he believed the lot lines were incorrect on the GIS
software which may cause issue with the variance.
b. Mr. Coley explained that the lot lines used on GIS are approximate and
not used to determine setback lengths.
c. Mr. Nation stated that he is for the variance.
3. Stated Name: Kandi O’Shields
a. Agreed with previous comments.
4. Public Letter: Jim Spearman, opposed
a. Read by Mr. Eagar
i. Mr. Spearman explained issue with the variance for two reasons.
ii. The first was a safety concern. He claimed that parking the truck
obstructed view of Knox Rd.
iii. The Second was that if approved, this variance was unfair to
surrounding citizens who followed setback requirements.
5. Michelle Pointer:
a. Responded to the email and stated that the complaints made about the
property are untrue. She stated that the garage was not a safety concern.
Applicant rebuttal:
NA.
Board Questions/ Discussion:
1. Mr. Decker asked what the issue was with going back further.
a. Mr. McKirgan explained that the property is a pie shape and going back
any further would extend the structure beyond his property line. He didn’t
choose to put the barn on the other side because he stated that water
would have drained into it.
2. Mr. Eagar questioned if it would have made more sense to build the pole barn
parallel with the existing garage.
a. Mr. McKirgan explained that he was about 5 feet from the existing
garage, however placing it as Mr. Eagar suggested would not have
worked because of the increased elevation of the yard.
b. Mr. Eagar suggested that it appeared to have worked based on the
property lines shown in GIS.
c. Ms. McKirgan stated that the pole barn is already parallel with the
garage on the backside of each.
d. Mr. Eagar reaffirmed that the two are parallel with each other on the
backside.
e. Mr. McKirgan explains that indeed it is, on one corner of the pole barn.
3. Mr. Gilster questioned if this variance isn’t approved what options are available
to Mr. and Ms. McKirgan.
a. Mr. McKirgan stated the he would then have to tear it down, as there is
nothing he could do to move it or otherwise remedy the violation.
b. Mr. Eagar asked Mr. McKirgan to clarify that it couldn’t be physically
moved from its current location.
c. Mr. Mays pointed out that the structure is on a poured concrete slab, and
is unlikely to be able to be moved.
d. Ms. McKirgan reaffirmed that the reason they trusted the contractors
because of the complexity of the finished pole barn.
4. Mr. Gilster asked if they had a building permit.
a. Ms. McKirgan explained they did not and had paperwork provided by the
contractors that said they didn’t need one.
b. Mr. Gilster questioned if the Mr. and Ms. McKirgan were aware that they
needed a building permit.
c. Mr. McKirgan stated that for a concrete slab with a metal building on top,
he didn’t know he needed one.
d. Ms. McKirgan reaffirmed the contractors told them they didn’t need one.
5. Mr. Gilster asked who was telling them they didn’t need a building permit.
a. Ms. McKirgan stated the contractors.
b. Mr. Coley presented to the board a page from the backup material which
shows the approved purchase order and handwritten on the middle of
the page is a note stating “permit – no.” Mr. Coley then questioned if this
note was what Ms. McKirgan was referencing.
c. Ms. McKirgan said it was.
6. Mr. Coley made a point that the applicant stated they were 11ft from the edge
of the road, and because of this, they needed to amend the 10ft variance to a
24 ft variance.
a. Mr. Eagar asked if there was a motion to amend the application.
i. Motion – Mr. Decker made a motion in the affirmative, seconded
by Mr. Mays. No Discussion
ii. Vote
In-favor Opposed
5 0
7. Mr. Mays questioned if the person who made the complaint was impacted by
the violation.
a. Complainant information cannot be disclosed.
8. Mr. Gilster asked if this property is the only one that is close to the road.
a. Mr. Nation and Ms. Pointer claimed there were.
9. Mr. James stated he drove through the neighborhood and confirmed the road
characteristics explained by Ms. Pointer.
10. Mr. Decker stated that it was hard to believe someone would build a structure
this significant
11. Mr. Gilster pointed out that BZA shouldn’t accept reason for variances to be
that they did not know about the permitting process.
a. Mr. Mays disagreed stating that people trust professionals and shouldn’t
be held liable for contractor’s wrongdoings.
Consideration of VA24-000009:
1. There are extraordinary and exceptional conditions pertaining to the particular
piece of property:
a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mr.
James. No discussion
b. Vote
In-favor Opposed
5 0
Mr. Eagar noted that the criterion did pass.
2. These conditions do not generally apply to other property in the vicinity:
a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mr.
Decker. No Discussion
b. Vote
In-favor Opposed
4 1
Mr. Gilster
Mr. Eagar noted that the criterion did pass.
3. Because of these conditions, the application of this chapter to the particular piece
of property would effectively prohibit or unreasonably restrict the utilization of the
property.
a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mr.
Decker. No discussion.
b. Vote
In-favor Opposed
4 1
Mr. Gilster
Mr. Eagar noted that the criterion did pass.
4. The authorization of a variance will not be of substantial detriment to adjacent
uses or to the public good, and the character of the district will not be harmed by
the granting of the variance.
a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mr.
James. No Discussion
b. Vote
In-favor Opposed
5 0
Mr. Eagar noted that the criterion did pass.
5. Mr. Eagar asked – Based on the evidence presented to the Board, do I hear a
motion that the proposed variance be Approved.
a. Motion – Mr. Mays made a motion; seconded by Mr. James. No
Discussion.
b. Vote
In-favor Opposed
4 1
Mr. Gilster
Mr. Eagar noted that variance request was approved
ITEM 8- Adjourn – Mr. Decker made a motion to adjourn, seconded by Mr. Mays. Mr.
Eagar called for a vote. Motion passed unanimously 5/0.
VA24-000010
SE24-000001
Legal Description:
1) #SE24-000001 for new communications tower.
Variance application: #VA24-000010 Duke Power Co. is requesting a 60-foot
increase to the 250-foot Industrial/agricultural height restriction for cell towers.
TMS 137-00-01-001 with an address of 7805 Rochester Hwy Seneca SC 29672.
Ref. Sec. 32-136
GIS:
Freedom of Information Act - Variance Application
Permitting Information
Code section
from which a
variance is
requested
[PermitVA:::5954:::151807]
Upload
Supporting
Documentation
Here
[PermitVA:::5954:::41341_WIDTH=0PX_HEIGHT=0PX]
Application is [PermitVA:::5954:::151813] Application is not [PermitVA:::5954:::151814]
APPLICANT RESPONSES TO SECTION 38-7.1
Describe the extraordinary and exceptional condition (such
as size, shape, and topography) that pertains to the subject
property that does not generally apply to other land or
structures in the vicinity.:
[PermitVA:::5954:::151816]
Are the circumstances affecting the subject property the
result of actions by the applicant/owner? Explain. [PermitVA:::5954:::151817]
Describe the ways in which application of the requirement(s)
of the ordinance effectively prohibit or unreasonably restrict
the utilization of the subject property.:
[PermitVA:::5954:::151818]
Will the proposed variance result in an activity that will not
be of substantial detriment to adjacent uses or to the public
good, and the character of the district will not be harmed by
the granting of the variance. Explain.:
[PermitVA:::5954:::151819]
General Contractor [PermitVA:::5954:::58234:::\[BUSINESS_NAME\]]
ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of
the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an
equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this
code.
Comments [PermitVA:::5954:::58237]
OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN
THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS
ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY
SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR
RESPONSIBILITY.
Workflow Reviews Information
Type Creation DateDue DateCompletion DateStatus Description
Application
Check 06/06/2024 06/07/202406/07/2024 Approved
Planning
and Zoning
Review
06/06/2024 07/31/202401/01/1900 Pending
Review
Complete06/06/2024 01/01/190001/01/1900
Inspection Information
Activities Information
Type Creation DateDue DateCompletion DateStatus Description
Online
Document
06/18/2024 06/25/202406/19/2024 CompleteRF Study Report: Oconee RF
Report.pdf
Freedom of Information Act - Variance Application
Permitting Information
Code section from which a
variance is requested 32-136 Upload Supporting
Documentation Here
Application is Application is not not restricted
APPLICANT RESPONSES TO SECTION 38-7.1
Describe the extraordinary and exceptional condition (such
as size, shape, and topography) that pertains to the subject
property that does not generally apply to other land or
structures in the vicinity.:
The proposed tower is situated on existing Duke Energy
property on the Oconee Nuclear
Substation. The conditions of the property topography
necessitate the requested height
variance to exceed 250 feet and are particular to this
Property for several reasons. First,
the placement of the tower is essential for effective point-to-
point connections. The
existing topography on and near the site will interfere with
those connections if the
requested variance is not granted. The requested height
variance will accommodate the
necessary antenna loading to make point-to-point
connections to allow the tower to
continue to be an asset to the community as technology
advances.
Second, the requested height variance will enable Duke
Energy to utilize a Land Mobile
Radio (LMR) system, which works at peak efficiency when
the antennas are mounted
with vertical separation to overcome the existing topography.
By raising the dishes on
the tower, the signal is improved, allowing for more
bandwidth, improved connections,
and better network performance overall.
Are the circumstances affecting the subject property the
result of actions by the applicant/owner? Explain.
Hardships did not result from actions taken by Duke Energy.
The placement of the
proposed tower is essential for effective point-to-point
connections to adjacent nearby
towers, and as such, Duke Energy proposes constructing at
this height and location to
overcome existing topography. The requested height
variance will accommodate the
necessary antenna loading to make those connections
which allows the tower to be an
asset to the community as technology advances.
The requested height will allow Duke Energy to utilize the
Land Mobile Radio (LMR)
system, which Duke Energy’s first responders use to help
repair critical infrastructure
when restoring service to Duke Energy’s customers. The
LMR system works at peak
efficiency when mounted with vertical separation. By raising
dishes on the towers, the
signal is improved, allowing for more bandwidth and better
network performance
overall. Additionally, by adding more antennas, Duke Energy
will be increasing
bandwidth and support a greater area of the Oconee
community
Describe the ways in which application of the requirement(s)
of the ordinance effectively prohibit or unreasonably restrict
the utilization of the subject property.:
Strict application of the Code’s height requirements to this
Property would result in the
unreasonable hardship of prohibiting the tower height
necessary for fundamental
physical infrastructure. This infrastructure is required to
support Duke Energy’s
SmartGrid, generation plant emergency signals,
transmission and substation line
communications, and distribution for day-to-day and storm
Operational Technologies.
Duke Energy’s SmartGrid investment connects the Field
Area Network to monitor and
control the electric grid.
The requested tower height of 310 feet will allow Duke
Energy to meet the needs of the
system in this location, and without the variance, the
purpose of constructing the
proposed tower will be negated. The proposed tower will
provide more bandwidth to
support newer technology and a more reliable grid as Duke
Energy’s service area grows.
Strict application to the Code, requiring the height to not
exceed 250 feet, would limit
Duke Energy’s Field Area Network and microwave systems
ability to make essential
point to point connections. It is a public necessity and, at the
proposed height and
location, is critical for the continued connectivity of the Duke
Energy system.
Will the proposed variance result in an activity that will not
be of substantial detriment to adjacent uses or to the public
good, and the character of the district will not be harmed by
the granting of the variance. Explain.:
The proposed variance will not be of substantial detriment to
adjacent uses or to the
public good, and the character of the district will not be
harmed. The Property contains
multiple utility uses including substation and transmission
line infrastructure. Thus, the
construction of the proposed tower will not contribute to any
additional changes to the
character of the property. Per Section 38-10.2 of the Oconee
County Zoning Ordinance,
the Control Free District (CFD) does not impose any use
restrictions for communication
towers. The proposed tower will not change the use of the
property but will further
support Duke Energy’s SmartGrid, generation plant
emergency signals, transmission
and substation line communications, and distribution for
day-to-day and storm
Operational Technologies, which enhances public safety and
welfare.
General Contractor
ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of
the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an
equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this
code.
Comments
OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN
THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS
ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY
SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR
RESPONSIBILITY.
Workflow Reviews Information
Type Creation DateDue DateCompletion DateStatus Description
Application
Check 06/06/2024 06/07/202406/07/2024 Approved
Section 1
Section 2
Section 3
Section 4
Section 5
Section 6
Section 7
Section 8
This Application was withdrawn from the 7/22/24 Agenda
VA24-000011
Legal Description:
Jim Anthony of Falls Park Subdivision is seeking relief from the 100-foot minimum
between a curve and intersecting road right of way. TMS 039-00-01-014 with an
address of 105 Jocassee Landing Dr. Salem SC 29676 Ref. Sec. 26-3 (e) (3)
GIS:
Freedom of Information Act - Variance Application
Permitting Information
Code section from which a
variance is requested Section 26-3 (e) (3) Upload Supporting
Documentation Here
Application is Application is not Not restricted
APPLICANT RESPONSES TO SECTION 38-7.1
Describe the extraordinary and exceptional condition (such
as size, shape, and topography) that pertains to the subject
property that does not generally apply to other land or
structures in the vicinity.:
We are requesting a variance to the horizontal curvature
geometry, specifically maintaining 100 feet from an
intersecting right of way before a curve, found in the Oconee
County Code of Ordinances Section 26-3 (e) (3) for the
following reasons:
1. The subject of the request is an existing road that will be
improved to meet the Oconee County Public Road
standards in every other way, except for the item that is the
subject of this request.
2. The topography of the property that the road serves is
mountainous, making modifications to meet the code item
both impractical and dangerous.
3. The subject of the variance request is a very small curve
after the first 31 feet which was needed to have the safest
angle of intersection with the intersection road.
4. Straightening just this small curve will result in a violation
of other geometry requirements and a less safe angle of
intersection of less than 70 degrees.
5. Other modifications that could be considered result in
violations of other geometry requirements, including
minimum tangent between reverse curves, vertical
curvature, and road grade, as well as requiring extreme
amounts of grading, high retaining walls, possibility of falling
rocks or landslides, and generally less safe conditions.
6. The intersecting road, McKinney Falls Parkway, is a low
traffic volume road. The current alignment of the intersection
is safe, with
7. The roads past the first cul-de-sac serve less than 10 lots
and do not need improvements to meet the county
standards
Are the circumstances affecting the subject property the
result of actions by the applicant/owner? Explain.
No. The road that is the subject of the request is an existing
road.
Describe the ways in which application of the requirement(s)
of the ordinance effectively prohibit or unreasonably restrict
the utilization of the subject property.:
Application of the requirements of the ordinance to prohibit
the property from being subdivided.
Will the proposed variance result in an activity that will not
be of substantial detriment to adjacent uses or to the public
good, and the character of the district will not be harmed by
the granting of the variance. Explain.:
Yes. The proposed variance will not result in anything
detrimental to adjacent uses, the public good, or the
character of the district. The variance will allow use of the
property and for improvement to the road for the public
good.
General Contractor
ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of
the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an
equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this
code.
Comments
OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN
THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS
ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY
SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR
RESPONSIBILITY.
21096REV-6B-5-3-24.dwg Model 5/15/2024 09:54:41 1 : 150
VA24-000012
Legal Description:
Devin Moeser is requesting a 6-foot variance to the front setback. TMS 271-01-01-137
with an address of 34 Ulster Dr. Seneca SC 29678. Ref. Sec. 38-10.2
GIS:
Freedom of Information Act - Variance Application
Permitting Information
Code section from which a
variance is requested
Upload Supporting
Documentation Here
Application is Application is not
APPLICANT RESPONSES TO SECTION 38-7.1
Describe the extraordinary and exceptional condition (such
as size, shape, and topography) that pertains to the subject
property that does not generally apply to other land or
structures in the vicinity.:
Are the circumstances affecting the subject property the
result of actions by the applicant/owner? Explain.
Describe the ways in which application of the requirement(s)
of the ordinance effectively prohibit or unreasonably restrict
the utilization of the subject property.:
Will the proposed variance result in an activity that will not
be of substantial detriment to adjacent uses or to the public
good, and the character of the district will not be harmed by
the granting of the variance. Explain.:
General Contractor
ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of
the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an
equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this
code.
Comments
OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN
THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS
ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY
SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR
RESPONSIBILITY.
Workflow Reviews Information
Type Creation DateDue DateCompletion DateStatus Description
Application
Check 06/07/2024 06/08/202406/07/2024 Approved
Planning
and Zoning
Review
06/07/2024 07/23/202401/01/1900 Pending
Review
Complete06/07/2024 01/01/190001/01/1900 Pending
Inspection Information
Activities Information
Type Creation DateDue DateCompletion DateStatus Description
Online
Document
Upload
06/27/2024 07/04/202407/16/2024 Complete
Closer Detail of 34 Ulster Dr : GSP-
21112 F1 11X17.pdf Final overall site
survey signed and stamped by Atlas
Surveyor: GSP-21112 F1 20240627.pdf
N O R T H W O R K S . C O M 1
To Oconee County Board of Zoning Appeals
I am writing to request a variance of the 25’-0” right of way setback requirement for the
residence located at 34 Ulster Dr. in Seneca, SC. A certified survey revealed that the residence was
encroaching on the required right of way setback for Ulster drive, per the attached exhibit. The
residence is located where the right of way increases from 50’-0” to 66’-0”. This resulted in an error
in the placement of the residence over the setback, 5’-6” at its greatest to 2’-6” at its least.
The residence is part of the greater student housing development known as “The Pier.” “The
Pier” was designed to encourage pedestrian activity across the development with low-speed roads,
large parkways, and sidewalks. Given the nature of Vehicular and Resident use on the property we
do not believe the encroachment will pose a threat to public safety. Additionally, the remaining
19’-6” setback allows significant space for any county utility or roadway improvements that will be
needed in the future. As such, I respectfully request that the Board grant a variance in this
instance.
Sincerely,
Chirag Patel, RA
Principal, Northworks Architects
SHEET 1TRACT A
SHEET 2TRACT 1
SHEET 7TRACT 11
SHEET 3 & 4TRACT 2
SHEET 6TRACT 6 & 10
SHEET 5TRACT 3
PREPARED FOR:CORE SPACESTRACT A, TRACT 1, TRACT 2, TRACT 3,TRACT 6, & 11 AT THE PIERAT CLEMSONPHASE 7
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SURVEYING, INC.ATLAS
TITLE SHEET
TRACT 1N/FCORE SVA SENECAEDINBURG LLC
EDINBURGH WAY66' R/W (PB:499 PG:8)
NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8)
PORT SETON RD50' R/W (PB:499 PG:8)
PORT SETON RD50' R/W (PB:499 PG:8)
HADDINGTON WAY50' R/W (PB:499 PG:8)
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC
NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8)
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
54
55
56
57
58
59
60
63
64656667686970
71
72
73
74
75
76
77
78
79 54
55
56
57
58
59
60
61
62
63
64656667686970
71
72
73
74
75
76
77
78
79
17
18
19
20
21
22
23
24
383940414243
44
45
46
47
48
49
50
51
52
23
24
25
354BDRM
4BDRM
4BDRM
4BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
PREPARED FOR:CORE SPACESTRACT ATHE PIER AT CLEMSONUNITS 17-24
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SHEET 1 OF 7
SURVEYING, INC.ATLAS
TRACT 1N/FCORE SVA SENECAEDINBURG LLC
N/FCORE SVA SENECAEDINBURG LLC
66' R/W (PB:499 PG:8)
PORT SETON RD50' R/W (PB:499 PG:8)
PORT SETON RD50' R/W (PB:499 PG:8)
HADDINGTON WAY50' R/W (PB:499 PG:8)
TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC
HADDINGTON WAY50' R/W (PB:499 PG:8)
GREY FRIARS CT50' R/W (PB:499 PG:8)
BROAD MEADOW DRIVE50' R/W (PB:499 PG:8)
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
4BDRM
4BDRM
4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
54
55
56
57
58
59
60
63
64656667686970
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
54
55
56
57
58
59
60
61
62
63
64656667686970
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
90
91
92
93
94
95
96
18
36
37
383940414243
44
45
46
47
48
49
50
51
52
53
9798
99
100
101 102103
104
105
106109
110
111
112
113
4BDRM
4BDRM
4BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
6BDRM
6BDRM
6BDRM6BDRM
6BDRM
PREPARED FOR:CORE SPACESTRACT 1THE PIER AT CLEMSONUNITS 54-96
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SHEET 2 OF 7
SURVEYING, INC.ATLAS
SHEET 3SHEET 4 SHEET 3SHEET 2
SANITARY SEWERLIFT STATIONN/FCORE SVA SENECAEDINBURG LLC
PORT SETON RD50' R/W (PB:499 PG:8)
HADDINGTON WAY50' R/W (PB:499 PG:8)
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC
U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8)
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
4BDRM
4BDRM4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM4BDRM
4BDRM
4BDRM
4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
55
56
57
58
59
60
63
6465
55
56
57
58
59
60
61
62
63
6465
22
23
24
36
37
383940414243
44
45
46
47
48
49
50
51
23
24
25
262728
29
30
31
32
3334
354BDRM
PREPARED FOR:CORE SPACESTRACT 2THE PIER AT CLEMSONUNITS 25-53 & 97-109
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SURVEYING, INC.ATLAS
SHEET 3 OF 7
SHEET 3SHEET 4
SHEET 3SHEET 2
HADDINGTON WAY50' R/W (PB:499 PG:8)
HADDINGTON WAY50' R/W (PB:499 PG:8)
GREY FRIARS CT50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT 3AN/F
CORE SVA SENECA EDINBURG LLC
#2 COMMON AREAPARK
#2 COMMON AREA
U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
54
55
56
57
58
59
60
90
91
92
93
94
95
96
54
55
56
57
58
59
60
61
90
91
92
93
94
95
96
45
46
47
48
49
50
51
52
53
9798
99
100
101 102103
104
105
106
107
108
109
110
111
112
113
4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
6BDRM
6BDRM
6BDRM6BDRM
6BDRM
PREPARED FOR:CORE SPACESTRACT 2THE PIER AT CLEMSONUNITS 25-53 & 97-109
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SHEET 4 OF 7
SURVEYING, INC.ATLAS
SHEET 3SHEET 4
SHEET 4SHEET 5
TRACT 6N/FCORE SVA SENECAEDINBURG LLC
#1 COMMON AREACORE SVA SENECAEDINBURG LLC
HADDINGTON WAY50' R/W (PB:499 PG:8)
GREY FRIARS CT50' R/W (PB:499 PG:8)
BROAD MEADOW DRIVE
BROAD MEADOW DRIVE50' R/W (PB:499 PG:8)
ULSTER DRIVE50' R/W (PB:499 PG:8)
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT 3AN/F
CORE SVA SENECA EDINBURG LLC
TRACT 3BN/FCORE SVA SENECAEDINBURG LLC
#2 COMMON AREAPARK
#2 COMMON AREAPARK
ROPES ALY50' R/W (PB:499 PG:8)
4BDRM
4BDRM
4BDRM
85
86
87
88
89
9085
86
87
88
90 99
100
101 102103
104
105
106
107
108
109
110
111
112
113
114115116117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136153
154
155
156
157
158
159
160
5BDRM
5BDRM
5BDRM
5BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
6BDRM
6BDRM
6BDRM6BDRM
6BDRM
6BDRM6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
PREPARED FOR:CORE SPACESTRACT 3A & 3BTHE PIER AT CLEMSONUNITS 110-129
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SHEET 5 OF 7
SURVEYING, INC.ATLAS
SHEET 4SHEET 5
SHEET 5SHEET 6
TRACT 6N/FCORE SVA SENECAEDINBURG LLC
#1 COMMON AREAN/FCORE SVA SENECAEDINBURG LLC
ULSTER DRIVE66' R/W (PB:499 PG:8)
TRACT 10N/FCORE SVA SENECAEDINBURG LLC
EDINBURGH WAY66' R/W (PB:499 PG:8)
ULSTER DRIVE50' R/W (PB:499 PG:8)
ULSTER DRIVE50' R/W (PB:499 PG:8)
TRACT 3BN/FCORE SVA SENECAEDINBURG LLC
TRACT 9N/FCORE SVA SENECAEDINBURG LLC
N/FCORE SVA SENECAEDINBURG LLC
QUEENS PARK LOOP50' R/W (PB:B545 PG:3) QUEENS PARK LOOP50' R/W (PB:B545 PG:3)
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM4BDRM
4BDRM
4BDRM
PREPARED FOR:CORE SPACESTRACT 10, #1 COMMONAREA AND TRACT 6THE PIER AT CLEMSONUNITS 130-181
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SURVEYING, INC.ATLAS
SHEET 6 OF 7
SHEET 5SHEET 6
TRACT 11N/FCORE SVA SENECAEDINBURG LLCN/FPOINTE WESTDEVELOPMENT LLC
JP STEVENS ROAD66' R/W (PB:B545 PG:3)
JP STEVENS ROAD66' R/W (PB:B545 PG:3)
ABERLADY66' R/W (PB:499 PG:8)
EDINBURGH WAY66' R/W (PB:499 PG:8)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SURVEYING, INC.ATLAS
SHEET 7 OF 7
PREPARED FOR:CORE SPACESTRACT 11THE PIER AT CLEMSONUNITS 1-16
SHEET 1TRACT A
SHEET 2TRACT 1
SHEET 7TRACT 11
SHEET 3 & 4TRACT 2
SHEET 6TRACT 6 & 10
SHEET 5TRACT 3
PREPARED FOR:CORE SPACESTRACT A, TRACT 1, TRACT 2, TRACT 3,TRACT 6, & 11 AT THE PIERAT CLEMSONPHASE 7
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SURVEYING, INC.ATLAS
TITLE SHEET
4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
54
55
56
57
58
59
60
63
64656667686970
71
72
73
74
75
76
77
78
79 54
55
56
57
58
59
60
61
62
63
64656667686970
71
72
73
74
75
76
77
78
79
17
18
19
20
21
22
23
24
383940414243
44
45
46
47
48
49
50
51
52
23
24
25
354BDRM
4BDRM
4BDRM
4BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
TRACT 1N/FCORE SVA SENECAEDINBURG LLC
EDINBURGH WAY66' R/W (PB:499 PG:8)
NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8)
PORT SETON RD50' R/W (PB:499 PG:8)
PORT SETON RD50' R/W (PB:499 PG:8)
HADDINGTON WAY50' R/W (PB:499 PG:8)
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC
NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8)
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
PREPARED FOR:CORE SPACESTRACT ATHE PIER AT CLEMSONUNITS 17-24
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SHEET 1 OF 7
SURVEYING, INC.ATLAS
4BDRM
4BDRM
4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
54
55
56
57
58
59
60
63
64656667686970
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
54
55
56
57
58
59
60
61
62
63
64656667686970
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
90
91
92
93
94
95
96
18
36
37
383940414243
44
45
46
47
48
49
50
51
52
53
9798
99
100
101 102103
104
105
106109
110
111
112
113
4BDRM
4BDRM
4BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
5BDRM
4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
6BDRM
6BDRM
6BDRM6BDRM
6BDRM
TRACT 1N/FCORE SVA SENECAEDINBURG LLC
N/FCORE SVA SENECAEDINBURG LLC
66' R/W (PB:499 PG:8)
PORT SETON RD50' R/W (PB:499 PG:8)
PORT SETON RD50' R/W (PB:499 PG:8)
HADDINGTON WAY50' R/W (PB:499 PG:8)
TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC
HADDINGTON WAY50' R/W (PB:499 PG:8)
GREY FRIARS CT50' R/W (PB:499 PG:8)
BROAD MEADOW DRIVE50' R/W (PB:499 PG:8)
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
PREPARED FOR:CORE SPACESTRACT 1THE PIER AT CLEMSONUNITS 54-96
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SHEET 2 OF 7
SURVEYING, INC.ATLAS
SHEET 3SHEET 4 SHEET 3SHEET 2
SANITARY SEWERLIFT STATIONN/FCORE SVA SENECAEDINBURG LLC
4BDRM
4BDRM4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM4BDRM
4BDRM
4BDRM
4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM
4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
55
56
57
58
59
60
63
6465
55
56
57
58
59
60
61
62
63
6465
22
23
24
36
37
383940414243
44
45
46
47
48
49
50
51
23
24
25
262728
29
30
31
32
3334
354BDRM
PORT SETON RD50' R/W (PB:499 PG:8)
HADDINGTON WAY50' R/W (PB:499 PG:8)
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC
U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8)
RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8)
PREPARED FOR:CORE SPACESTRACT 2THE PIER AT CLEMSONUNITS 25-53 & 97-109
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SURVEYING, INC.ATLAS
SHEET 3 OF 7
SHEET 3SHEET 4
SHEET 3SHEET 2
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
54
55
56
57
58
59
60
90
91
92
93
94
95
96
54
55
56
57
58
59
60
61
90
91
92
93
94
95
96
45
46
47
48
49
50
51
52
53
9798
99
100
101 102103
104
105
106
107
108
109
110
111
112
113
4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
6BDRM
6BDRM
6BDRM6BDRM
6BDRM
HADDINGTON WAY50' R/W (PB:499 PG:8)
HADDINGTON WAY50' R/W (PB:499 PG:8)
GREY FRIARS CT50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT 3AN/F
CORE SVA SENECA EDINBURG LLC
#2 COMMON AREAPARK
#2 COMMON AREA
U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4)
PREPARED FOR:CORE SPACESTRACT 2THE PIER AT CLEMSONUNITS 25-53 & 97-109
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SHEET 4 OF 7
SURVEYING, INC.ATLAS
SHEET 3SHEET 4
SHEET 4SHEET 5
4BDRM
4BDRM
4BDRM
85
86
87
88
89
9085
86
87
88
90 99
100
101 102103
104
105
106
107
108
109
110
111
112
113
114115116117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136153
154
155
156
157
158
159
160
5BDRM
5BDRM
5BDRM
5BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
6BDRM
6BDRM
6BDRM6BDRM
6BDRM
6BDRM6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
ULSTER DRIVE CL50' R/W
4BDRM
TRACT 6N/FCORE SVA SENECAEDINBURG LLC
#1 COMMON AREACORE SVA SENECAEDINBURG LLC
HADDINGTON WAY50' R/W (PB:499 PG:8)
GREY FRIARS CT50' R/W (PB:499 PG:8)
BROAD MEADOW DRIVE
BROAD MEADOW DRIVE50' R/W (PB:499 PG:8)
ULSTER DRIVE50' R/W (PB:499 PG:8)
TRACT 2N/FCORE SVA SENECAEDINBURG LLC
TRACT 3AN/F
CORE SVA SENECA EDINBURG LLC
TRACT 3BN/FCORE SVA SENECAEDINBURG LLC
#2 COMMON AREAPARK
#2 COMMON AREAPARK
ROPES ALY50' R/W (PB:499 PG:8)
PREPARED FOR:CORE SPACESTRACT 3A & 3BTHE PIER AT CLEMSONUNITS 110-129
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SHEET 5 OF 7
SURVEYING, INC.ATLAS
SHEET 4SHEET 5
SHEET 5SHEET 6
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
6BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM
4BDRM4BDRM
4BDRM
4BDRM
ULSTER DRIVE CL50' R/W
4BDRM
TRACT 6N/FCORE SVA SENECAEDINBURG LLC
#1 COMMON AREAN/FCORE SVA SENECAEDINBURG LLC
ULSTER DRIVE66' R/W (PB:499 PG:8)
TRACT 10N/FCORE SVA SENECAEDINBURG LLC
EDINBURGH WAY66' R/W (PB:499 PG:8)
ULSTER DRIVE50' R/W (PB:499 PG:8)
ULSTER DRIVE50' R/W (PB:499 PG:8)
TRACT 3BN/FCORE SVA SENECAEDINBURG LLC
TRACT 9N/FCORE SVA SENECAEDINBURG LLC
N/FCORE SVA SENECAEDINBURG LLC
QUEENS PARK LOOP50' R/W (PB:B545 PG:3) QUEENS PARK LOOP50' R/W (PB:B545 PG:3)
PREPARED FOR:CORE SPACESTRACT 10, #1 COMMONAREA AND TRACT 6THE PIER AT CLEMSONUNITS 130-181
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SURVEYING, INC.ATLAS
SHEET 6 OF 7
SHEET 5SHEET 6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
9BDRM
TRACT 11N/FCORE SVA SENECAEDINBURG LLCN/FPOINTE WESTDEVELOPMENT LLC
JP STEVENS ROAD66' R/W (PB:B545 PG:3)
JP STEVENS ROAD66' R/W (PB:B545 PG:3)
ABERLADY66' R/W (PB:499 PG:8)
EDINBURGH WAY66' R/W (PB:499 PG:8)
CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL
LAND SURVEYORBARRY O. BARTHOLOW
SITE
SURVEYING, INC.ATLAS
SHEET 7 OF 7
PREPARED FOR:CORE SPACESTRACT 11THE PIER AT CLEMSONUNITS 1-16
Source: Oconee County website. First collected Nov 21, 2026.