RecordWell Data

Backup Material

Oconee County · Oconee County · meeting of Jul 22, 2024 · Other

Open the original document More from Oconee County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

BOARD MEMBERS James Henderson, District I Bill Gilster, District III Gwen Fowler, District II Thomas James, District IV John Eagar, Chairman, At-Large Tim Mays, District V Bill Decker, At-Large Meeting agenda Monday July 22 6:00pm 1. Call to order 2. Approval of minutes: 06.24.24 3. Brief statement about rules and procedures 4. Special Exemption application: #SE24-000001 for new communications tower. Variance application: #VA24-000010 Duke Power Co. is requesting a 60-foot increase to the 250-foot Industrial/agricultural height restriction for cell towers. TMS 137-00-01-001 with an address of 7805 Rochester Hwy Seneca SC 29672. Ref. Sec. 32-136 5. ***This application was withdrawn from the 07/22/24 Agenda*** Variance application: #VA24-000011 Jim Anthony of Falls Park Subdivision is seeking relief from the 100-foot minimum between a curve and intersecting road right of way. TMS 039-00- 01-014 with an address of 105 Jocassee Landing Dr. Salem SC 29676 Ref. Sec. 26-3 (e) (3) 6. Variance application: #VA24-000012 Devin Moeser is requesting a 6-foot variance to the front setback. TMS 271-01-01-137 with an address of 34 Ulster Dr. Seneca SC 29678. Ref. Sec. 38-10.2 7. Adjourn Oconee County Board of Zoning Appeals Council Chambers 415 South Pine Street Walhalla, S.C. 29691 www.oconeesc.com YouTube: “YourOconee” Staff contact 846-638-4218 planninginfo@oconeesc.com Minutes 6:00 PM – June 24, 2024 Members in Attendance Will Decker – At Large Bill Gilster – District 3 Tim Mays – District 5 John Eagar – At Large Thomas James – District 4 Members Absent Jim Henderson – District 1 Gwen Fowler -District 2 Staff James Coley Logan Gibbons ITEM 1 – Call to Order – Mr. Eagar called the meeting to order at 6:00 PM. ITEM 2 – Motion to approve the minutes from February 26, 2024 – Mr. Gilster made a motion to approve the minutes; seconded by Mr. James. Mr. Eagar called for a vote. The motion passed 5/0/0 ITEM 3 – Brief statement about rules and procedures – Mr. Eagar outlined the proceedings of the meeting going forward:  Applicant will provide a presentation to state their request (5 minutes).  Staff will be asked to make any comments regarding the request.  The public is allowed to voice their approval or opposition to the proposed. Please do not repeat opinions that have already been stated into the record (3-5 minutes).  Applicant rebuttal  Board members will discuss in detail.  Voting ITEM 4. Variance application ##VA24-000009 Louise McKirgan is requesting a 10- foot variance to the front setback for an existing garage. TMS 286-00-01-046 with an address of 308 Knox Cove Rd. Westminster SC 29693. *During Presentation the Variance application was amended to be increased to 24ft. Details below. Applicant Comments: Stated Name: Louise and Charles McKirgan. Ms. McKirgan explained that when they had just moved to the property they had hired professional contractors to build the pole barn. They had trusted that the contractors would pull the necessary permits required and adhere to local ordinances correctly. Ms. McKirgan stated that the pole barn was 14ft from the road. Mr. McKirgan explained that he believed he couldn’t do that and staked out his property line and moved the structure just inside the line, without knowledge of setback requirements. Ms. McKirgan explained that the structure surroundings are neat and clean, and do not interfere with the road. Staff comments: Mr. Coley pointed out that the reason for this variance is that someone had made a complaint against this property and that the code enforcement officers and confirmed that a violation had been committed. The need for the variance was to remedy that violation. A building permit would still be required to be applied for after the variance ruling if granted. Public comment: 1. Stated Name: Michelle Pointer a. Ms. Pointer first stated that the garage referenced by Mr. Eagar is actually just a carport b. Ms. Pointer explained that the neighborhood road is a low use, low speed road that would not pose an increased danger by having the McKirgan’s garage there. c. Ms. Pointer stated she agrees the variance should be given. 2. Stated Name: Jonathan Nation a. Mr. Nation stated that he believed the lot lines were incorrect on the GIS software which may cause issue with the variance. b. Mr. Coley explained that the lot lines used on GIS are approximate and not used to determine setback lengths. c. Mr. Nation stated that he is for the variance. 3. Stated Name: Kandi O’Shields a. Agreed with previous comments. 4. Public Letter: Jim Spearman, opposed a. Read by Mr. Eagar i. Mr. Spearman explained issue with the variance for two reasons. ii. The first was a safety concern. He claimed that parking the truck obstructed view of Knox Rd. iii. The Second was that if approved, this variance was unfair to surrounding citizens who followed setback requirements. 5. Michelle Pointer: a. Responded to the email and stated that the complaints made about the property are untrue. She stated that the garage was not a safety concern. Applicant rebuttal: NA. Board Questions/ Discussion: 1. Mr. Decker asked what the issue was with going back further. a. Mr. McKirgan explained that the property is a pie shape and going back any further would extend the structure beyond his property line. He didn’t choose to put the barn on the other side because he stated that water would have drained into it. 2. Mr. Eagar questioned if it would have made more sense to build the pole barn parallel with the existing garage. a. Mr. McKirgan explained that he was about 5 feet from the existing garage, however placing it as Mr. Eagar suggested would not have worked because of the increased elevation of the yard. b. Mr. Eagar suggested that it appeared to have worked based on the property lines shown in GIS. c. Ms. McKirgan stated that the pole barn is already parallel with the garage on the backside of each. d. Mr. Eagar reaffirmed that the two are parallel with each other on the backside. e. Mr. McKirgan explains that indeed it is, on one corner of the pole barn. 3. Mr. Gilster questioned if this variance isn’t approved what options are available to Mr. and Ms. McKirgan. a. Mr. McKirgan stated the he would then have to tear it down, as there is nothing he could do to move it or otherwise remedy the violation. b. Mr. Eagar asked Mr. McKirgan to clarify that it couldn’t be physically moved from its current location. c. Mr. Mays pointed out that the structure is on a poured concrete slab, and is unlikely to be able to be moved. d. Ms. McKirgan reaffirmed that the reason they trusted the contractors because of the complexity of the finished pole barn. 4. Mr. Gilster asked if they had a building permit. a. Ms. McKirgan explained they did not and had paperwork provided by the contractors that said they didn’t need one. b. Mr. Gilster questioned if the Mr. and Ms. McKirgan were aware that they needed a building permit. c. Mr. McKirgan stated that for a concrete slab with a metal building on top, he didn’t know he needed one. d. Ms. McKirgan reaffirmed the contractors told them they didn’t need one. 5. Mr. Gilster asked who was telling them they didn’t need a building permit. a. Ms. McKirgan stated the contractors. b. Mr. Coley presented to the board a page from the backup material which shows the approved purchase order and handwritten on the middle of the page is a note stating “permit – no.” Mr. Coley then questioned if this note was what Ms. McKirgan was referencing. c. Ms. McKirgan said it was. 6. Mr. Coley made a point that the applicant stated they were 11ft from the edge of the road, and because of this, they needed to amend the 10ft variance to a 24 ft variance. a. Mr. Eagar asked if there was a motion to amend the application. i. Motion – Mr. Decker made a motion in the affirmative, seconded by Mr. Mays. No Discussion ii. Vote In-favor Opposed 5 0 7. Mr. Mays questioned if the person who made the complaint was impacted by the violation. a. Complainant information cannot be disclosed. 8. Mr. Gilster asked if this property is the only one that is close to the road. a. Mr. Nation and Ms. Pointer claimed there were. 9. Mr. James stated he drove through the neighborhood and confirmed the road characteristics explained by Ms. Pointer. 10. Mr. Decker stated that it was hard to believe someone would build a structure this significant 11. Mr. Gilster pointed out that BZA shouldn’t accept reason for variances to be that they did not know about the permitting process. a. Mr. Mays disagreed stating that people trust professionals and shouldn’t be held liable for contractor’s wrongdoings. Consideration of VA24-000009: 1. There are extraordinary and exceptional conditions pertaining to the particular piece of property: a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mr. James. No discussion b. Vote In-favor Opposed 5 0 Mr. Eagar noted that the criterion did pass. 2. These conditions do not generally apply to other property in the vicinity: a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mr. Decker. No Discussion b. Vote In-favor Opposed 4 1 Mr. Gilster Mr. Eagar noted that the criterion did pass. 3. Because of these conditions, the application of this chapter to the particular piece of property would effectively prohibit or unreasonably restrict the utilization of the property. a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mr. Decker. No discussion. b. Vote In-favor Opposed 4 1 Mr. Gilster Mr. Eagar noted that the criterion did pass. 4. The authorization of a variance will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mr. James. No Discussion b. Vote In-favor Opposed 5 0 Mr. Eagar noted that the criterion did pass. 5. Mr. Eagar asked – Based on the evidence presented to the Board, do I hear a motion that the proposed variance be Approved. a. Motion – Mr. Mays made a motion; seconded by Mr. James. No Discussion. b. Vote In-favor Opposed 4 1 Mr. Gilster Mr. Eagar noted that variance request was approved ITEM 8- Adjourn – Mr. Decker made a motion to adjourn, seconded by Mr. Mays. Mr. Eagar called for a vote. Motion passed unanimously 5/0. VA24-000010 SE24-000001 Legal Description: 1) #SE24-000001 for new communications tower. Variance application: #VA24-000010 Duke Power Co. is requesting a 60-foot increase to the 250-foot Industrial/agricultural height restriction for cell towers. TMS 137-00-01-001 with an address of 7805 Rochester Hwy Seneca SC 29672. Ref. Sec. 32-136 GIS: Freedom of Information Act - Variance Application Permitting Information Code section from which a variance is requested [PermitVA:::5954:::151807] Upload Supporting Documentation Here [PermitVA:::5954:::41341_WIDTH=0PX_HEIGHT=0PX] Application is [PermitVA:::5954:::151813] Application is not [PermitVA:::5954:::151814] APPLICANT RESPONSES TO SECTION 38-7.1 Describe the extraordinary and exceptional condition (such as size, shape, and topography) that pertains to the subject property that does not generally apply to other land or structures in the vicinity.: [PermitVA:::5954:::151816] Are the circumstances affecting the subject property the result of actions by the applicant/owner? Explain. [PermitVA:::5954:::151817] Describe the ways in which application of the requirement(s) of the ordinance effectively prohibit or unreasonably restrict the utilization of the subject property.: [PermitVA:::5954:::151818] Will the proposed variance result in an activity that will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. Explain.: [PermitVA:::5954:::151819] General Contractor [PermitVA:::5954:::58234:::\[BUSINESS_NAME\]] ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this code. Comments [PermitVA:::5954:::58237] OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR RESPONSIBILITY. Workflow Reviews Information Type Creation DateDue DateCompletion DateStatus Description Application Check 06/06/2024 06/07/202406/07/2024 Approved Planning and Zoning Review 06/06/2024 07/31/202401/01/1900 Pending Review Complete06/06/2024 01/01/190001/01/1900 Inspection Information Activities Information Type Creation DateDue DateCompletion DateStatus Description Online Document 06/18/2024 06/25/202406/19/2024 CompleteRF Study Report: Oconee RF Report.pdf Freedom of Information Act - Variance Application Permitting Information Code section from which a variance is requested 32-136 Upload Supporting Documentation Here Application is Application is not not restricted APPLICANT RESPONSES TO SECTION 38-7.1 Describe the extraordinary and exceptional condition (such as size, shape, and topography) that pertains to the subject property that does not generally apply to other land or structures in the vicinity.: The proposed tower is situated on existing Duke Energy property on the Oconee Nuclear Substation. The conditions of the property topography necessitate the requested height variance to exceed 250 feet and are particular to this Property for several reasons. First, the placement of the tower is essential for effective point-to- point connections. The existing topography on and near the site will interfere with those connections if the requested variance is not granted. The requested height variance will accommodate the necessary antenna loading to make point-to-point connections to allow the tower to continue to be an asset to the community as technology advances. Second, the requested height variance will enable Duke Energy to utilize a Land Mobile Radio (LMR) system, which works at peak efficiency when the antennas are mounted with vertical separation to overcome the existing topography. By raising the dishes on the tower, the signal is improved, allowing for more bandwidth, improved connections, and better network performance overall. Are the circumstances affecting the subject property the result of actions by the applicant/owner? Explain. Hardships did not result from actions taken by Duke Energy. The placement of the proposed tower is essential for effective point-to-point connections to adjacent nearby towers, and as such, Duke Energy proposes constructing at this height and location to overcome existing topography. The requested height variance will accommodate the necessary antenna loading to make those connections which allows the tower to be an asset to the community as technology advances. The requested height will allow Duke Energy to utilize the Land Mobile Radio (LMR) system, which Duke Energy’s first responders use to help repair critical infrastructure when restoring service to Duke Energy’s customers. The LMR system works at peak efficiency when mounted with vertical separation. By raising dishes on the towers, the signal is improved, allowing for more bandwidth and better network performance overall. Additionally, by adding more antennas, Duke Energy will be increasing bandwidth and support a greater area of the Oconee community Describe the ways in which application of the requirement(s) of the ordinance effectively prohibit or unreasonably restrict the utilization of the subject property.: Strict application of the Code’s height requirements to this Property would result in the unreasonable hardship of prohibiting the tower height necessary for fundamental physical infrastructure. This infrastructure is required to support Duke Energy’s SmartGrid, generation plant emergency signals, transmission and substation line communications, and distribution for day-to-day and storm Operational Technologies. Duke Energy’s SmartGrid investment connects the Field Area Network to monitor and control the electric grid. The requested tower height of 310 feet will allow Duke Energy to meet the needs of the system in this location, and without the variance, the purpose of constructing the proposed tower will be negated. The proposed tower will provide more bandwidth to support newer technology and a more reliable grid as Duke Energy’s service area grows. Strict application to the Code, requiring the height to not exceed 250 feet, would limit Duke Energy’s Field Area Network and microwave systems ability to make essential point to point connections. It is a public necessity and, at the proposed height and location, is critical for the continued connectivity of the Duke Energy system. Will the proposed variance result in an activity that will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. Explain.: The proposed variance will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed. The Property contains multiple utility uses including substation and transmission line infrastructure. Thus, the construction of the proposed tower will not contribute to any additional changes to the character of the property. Per Section 38-10.2 of the Oconee County Zoning Ordinance, the Control Free District (CFD) does not impose any use restrictions for communication towers. The proposed tower will not change the use of the property but will further support Duke Energy’s SmartGrid, generation plant emergency signals, transmission and substation line communications, and distribution for day-to-day and storm Operational Technologies, which enhances public safety and welfare. General Contractor ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this code. Comments OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR RESPONSIBILITY. Workflow Reviews Information Type Creation DateDue DateCompletion DateStatus Description Application Check 06/06/2024 06/07/202406/07/2024 Approved Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 This Application was withdrawn from the 7/22/24 Agenda VA24-000011 Legal Description: Jim Anthony of Falls Park Subdivision is seeking relief from the 100-foot minimum between a curve and intersecting road right of way. TMS 039-00-01-014 with an address of 105 Jocassee Landing Dr. Salem SC 29676 Ref. Sec. 26-3 (e) (3) GIS: Freedom of Information Act - Variance Application Permitting Information Code section from which a variance is requested Section 26-3 (e) (3) Upload Supporting Documentation Here Application is Application is not Not restricted APPLICANT RESPONSES TO SECTION 38-7.1 Describe the extraordinary and exceptional condition (such as size, shape, and topography) that pertains to the subject property that does not generally apply to other land or structures in the vicinity.: We are requesting a variance to the horizontal curvature geometry, specifically maintaining 100 feet from an intersecting right of way before a curve, found in the Oconee County Code of Ordinances Section 26-3 (e) (3) for the following reasons: 1. The subject of the request is an existing road that will be improved to meet the Oconee County Public Road standards in every other way, except for the item that is the subject of this request. 2. The topography of the property that the road serves is mountainous, making modifications to meet the code item both impractical and dangerous. 3. The subject of the variance request is a very small curve after the first 31 feet which was needed to have the safest angle of intersection with the intersection road. 4. Straightening just this small curve will result in a violation of other geometry requirements and a less safe angle of intersection of less than 70 degrees. 5. Other modifications that could be considered result in violations of other geometry requirements, including minimum tangent between reverse curves, vertical curvature, and road grade, as well as requiring extreme amounts of grading, high retaining walls, possibility of falling rocks or landslides, and generally less safe conditions. 6. The intersecting road, McKinney Falls Parkway, is a low traffic volume road. The current alignment of the intersection is safe, with 7. The roads past the first cul-de-sac serve less than 10 lots and do not need improvements to meet the county standards Are the circumstances affecting the subject property the result of actions by the applicant/owner? Explain. No. The road that is the subject of the request is an existing road. Describe the ways in which application of the requirement(s) of the ordinance effectively prohibit or unreasonably restrict the utilization of the subject property.: Application of the requirements of the ordinance to prohibit the property from being subdivided. Will the proposed variance result in an activity that will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. Explain.: Yes. The proposed variance will not result in anything detrimental to adjacent uses, the public good, or the character of the district. The variance will allow use of the property and for improvement to the road for the public good. General Contractor ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this code. Comments OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR RESPONSIBILITY. 21096REV-6B-5-3-24.dwg Model 5/15/2024 09:54:41 1 : 150 VA24-000012 Legal Description: Devin Moeser is requesting a 6-foot variance to the front setback. TMS 271-01-01-137 with an address of 34 Ulster Dr. Seneca SC 29678. Ref. Sec. 38-10.2 GIS: Freedom of Information Act - Variance Application Permitting Information Code section from which a variance is requested Upload Supporting Documentation Here Application is Application is not APPLICANT RESPONSES TO SECTION 38-7.1 Describe the extraordinary and exceptional condition (such as size, shape, and topography) that pertains to the subject property that does not generally apply to other land or structures in the vicinity.: Are the circumstances affecting the subject property the result of actions by the applicant/owner? Explain. Describe the ways in which application of the requirement(s) of the ordinance effectively prohibit or unreasonably restrict the utilization of the subject property.: Will the proposed variance result in an activity that will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. Explain.: General Contractor ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this code. Comments OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR RESPONSIBILITY. Workflow Reviews Information Type Creation DateDue DateCompletion DateStatus Description Application Check 06/07/2024 06/08/202406/07/2024 Approved Planning and Zoning Review 06/07/2024 07/23/202401/01/1900 Pending Review Complete06/07/2024 01/01/190001/01/1900 Pending Inspection Information Activities Information Type Creation DateDue DateCompletion DateStatus Description Online Document Upload 06/27/2024 07/04/202407/16/2024 Complete Closer Detail of 34 Ulster Dr : GSP- 21112 F1 11X17.pdf Final overall site survey signed and stamped by Atlas Surveyor: GSP-21112 F1 20240627.pdf N O R T H W O R K S . C O M 1 To Oconee County Board of Zoning Appeals I am writing to request a variance of the 25’-0” right of way setback requirement for the residence located at 34 Ulster Dr. in Seneca, SC. A certified survey revealed that the residence was encroaching on the required right of way setback for Ulster drive, per the attached exhibit. The residence is located where the right of way increases from 50’-0” to 66’-0”. This resulted in an error in the placement of the residence over the setback, 5’-6” at its greatest to 2’-6” at its least. The residence is part of the greater student housing development known as “The Pier.” “The Pier” was designed to encourage pedestrian activity across the development with low-speed roads, large parkways, and sidewalks. Given the nature of Vehicular and Resident use on the property we do not believe the encroachment will pose a threat to public safety. Additionally, the remaining 19’-6” setback allows significant space for any county utility or roadway improvements that will be needed in the future. As such, I respectfully request that the Board grant a variance in this instance. Sincerely, Chirag Patel, RA Principal, Northworks Architects SHEET 1TRACT A SHEET 2TRACT 1 SHEET 7TRACT 11 SHEET 3 & 4TRACT 2 SHEET 6TRACT 6 & 10 SHEET 5TRACT 3 PREPARED FOR:CORE SPACESTRACT A, TRACT 1, TRACT 2, TRACT 3,TRACT 6, & 11 AT THE PIERAT CLEMSONPHASE 7 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SURVEYING, INC.ATLAS TITLE SHEET TRACT 1N/FCORE SVA SENECAEDINBURG LLC EDINBURGH WAY66' R/W (PB:499 PG:8) NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8) PORT SETON RD50' R/W (PB:499 PG:8) PORT SETON RD50' R/W (PB:499 PG:8) HADDINGTON WAY50' R/W (PB:499 PG:8) RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8) RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) 4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) 54 55 56 57 58 59 60 63 64656667686970 71 72 73 74 75 76 77 78 79 54 55 56 57 58 59 60 61 62 63 64656667686970 71 72 73 74 75 76 77 78 79 17 18 19 20 21 22 23 24 383940414243 44 45 46 47 48 49 50 51 52 23 24 25 354BDRM 4BDRM 4BDRM 4BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM PREPARED FOR:CORE SPACESTRACT ATHE PIER AT CLEMSONUNITS 17-24 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SHEET 1 OF 7 SURVEYING, INC.ATLAS TRACT 1N/FCORE SVA SENECAEDINBURG LLC N/FCORE SVA SENECAEDINBURG LLC 66' R/W (PB:499 PG:8) PORT SETON RD50' R/W (PB:499 PG:8) PORT SETON RD50' R/W (PB:499 PG:8) HADDINGTON WAY50' R/W (PB:499 PG:8) TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC HADDINGTON WAY50' R/W (PB:499 PG:8) GREY FRIARS CT50' R/W (PB:499 PG:8) BROAD MEADOW DRIVE50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT 2N/FCORE SVA SENECAEDINBURG LLC U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) 4BDRM 4BDRM 4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 54 55 56 57 58 59 60 63 64656667686970 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 54 55 56 57 58 59 60 61 62 63 64656667686970 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 90 91 92 93 94 95 96 18 36 37 383940414243 44 45 46 47 48 49 50 51 52 53 9798 99 100 101 102103 104 105 106109 110 111 112 113 4BDRM 4BDRM 4BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 6BDRM 6BDRM 6BDRM6BDRM 6BDRM PREPARED FOR:CORE SPACESTRACT 1THE PIER AT CLEMSONUNITS 54-96 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SHEET 2 OF 7 SURVEYING, INC.ATLAS SHEET 3SHEET 4 SHEET 3SHEET 2 SANITARY SEWERLIFT STATIONN/FCORE SVA SENECAEDINBURG LLC PORT SETON RD50' R/W (PB:499 PG:8) HADDINGTON WAY50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8) RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) 4BDRM 4BDRM4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM4BDRM 4BDRM 4BDRM 4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) 55 56 57 58 59 60 63 6465 55 56 57 58 59 60 61 62 63 6465 22 23 24 36 37 383940414243 44 45 46 47 48 49 50 51 23 24 25 262728 29 30 31 32 3334 354BDRM PREPARED FOR:CORE SPACESTRACT 2THE PIER AT CLEMSONUNITS 25-53 & 97-109 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SURVEYING, INC.ATLAS SHEET 3 OF 7 SHEET 3SHEET 4 SHEET 3SHEET 2 HADDINGTON WAY50' R/W (PB:499 PG:8) HADDINGTON WAY50' R/W (PB:499 PG:8) GREY FRIARS CT50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT 3AN/F CORE SVA SENECA EDINBURG LLC #2 COMMON AREAPARK #2 COMMON AREA U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 54 55 56 57 58 59 60 90 91 92 93 94 95 96 54 55 56 57 58 59 60 61 90 91 92 93 94 95 96 45 46 47 48 49 50 51 52 53 9798 99 100 101 102103 104 105 106 107 108 109 110 111 112 113 4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 6BDRM 6BDRM 6BDRM6BDRM 6BDRM PREPARED FOR:CORE SPACESTRACT 2THE PIER AT CLEMSONUNITS 25-53 & 97-109 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SHEET 4 OF 7 SURVEYING, INC.ATLAS SHEET 3SHEET 4 SHEET 4SHEET 5 TRACT 6N/FCORE SVA SENECAEDINBURG LLC #1 COMMON AREACORE SVA SENECAEDINBURG LLC HADDINGTON WAY50' R/W (PB:499 PG:8) GREY FRIARS CT50' R/W (PB:499 PG:8) BROAD MEADOW DRIVE BROAD MEADOW DRIVE50' R/W (PB:499 PG:8) ULSTER DRIVE50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT 3AN/F CORE SVA SENECA EDINBURG LLC TRACT 3BN/FCORE SVA SENECAEDINBURG LLC #2 COMMON AREAPARK #2 COMMON AREAPARK ROPES ALY50' R/W (PB:499 PG:8) 4BDRM 4BDRM 4BDRM 85 86 87 88 89 9085 86 87 88 90 99 100 101 102103 104 105 106 107 108 109 110 111 112 113 114115116117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136153 154 155 156 157 158 159 160 5BDRM 5BDRM 5BDRM 5BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 6BDRM 6BDRM 6BDRM6BDRM 6BDRM 6BDRM6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM PREPARED FOR:CORE SPACESTRACT 3A & 3BTHE PIER AT CLEMSONUNITS 110-129 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SHEET 5 OF 7 SURVEYING, INC.ATLAS SHEET 4SHEET 5 SHEET 5SHEET 6 TRACT 6N/FCORE SVA SENECAEDINBURG LLC #1 COMMON AREAN/FCORE SVA SENECAEDINBURG LLC ULSTER DRIVE66' R/W (PB:499 PG:8) TRACT 10N/FCORE SVA SENECAEDINBURG LLC EDINBURGH WAY66' R/W (PB:499 PG:8) ULSTER DRIVE50' R/W (PB:499 PG:8) ULSTER DRIVE50' R/W (PB:499 PG:8) TRACT 3BN/FCORE SVA SENECAEDINBURG LLC TRACT 9N/FCORE SVA SENECAEDINBURG LLC N/FCORE SVA SENECAEDINBURG LLC QUEENS PARK LOOP50' R/W (PB:B545 PG:3) QUEENS PARK LOOP50' R/W (PB:B545 PG:3) 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM4BDRM 4BDRM 4BDRM PREPARED FOR:CORE SPACESTRACT 10, #1 COMMONAREA AND TRACT 6THE PIER AT CLEMSONUNITS 130-181 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SURVEYING, INC.ATLAS SHEET 6 OF 7 SHEET 5SHEET 6 TRACT 11N/FCORE SVA SENECAEDINBURG LLCN/FPOINTE WESTDEVELOPMENT LLC JP STEVENS ROAD66' R/W (PB:B545 PG:3) JP STEVENS ROAD66' R/W (PB:B545 PG:3) ABERLADY66' R/W (PB:499 PG:8) EDINBURGH WAY66' R/W (PB:499 PG:8) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SURVEYING, INC.ATLAS SHEET 7 OF 7 PREPARED FOR:CORE SPACESTRACT 11THE PIER AT CLEMSONUNITS 1-16 SHEET 1TRACT A SHEET 2TRACT 1 SHEET 7TRACT 11 SHEET 3 & 4TRACT 2 SHEET 6TRACT 6 & 10 SHEET 5TRACT 3 PREPARED FOR:CORE SPACESTRACT A, TRACT 1, TRACT 2, TRACT 3,TRACT 6, & 11 AT THE PIERAT CLEMSONPHASE 7 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SURVEYING, INC.ATLAS TITLE SHEET 4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) 54 55 56 57 58 59 60 63 64656667686970 71 72 73 74 75 76 77 78 79 54 55 56 57 58 59 60 61 62 63 64656667686970 71 72 73 74 75 76 77 78 79 17 18 19 20 21 22 23 24 383940414243 44 45 46 47 48 49 50 51 52 23 24 25 354BDRM 4BDRM 4BDRM 4BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM TRACT 1N/FCORE SVA SENECAEDINBURG LLC EDINBURGH WAY66' R/W (PB:499 PG:8) NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8) PORT SETON RD50' R/W (PB:499 PG:8) PORT SETON RD50' R/W (PB:499 PG:8) HADDINGTON WAY50' R/W (PB:499 PG:8) RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8) RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) PREPARED FOR:CORE SPACESTRACT ATHE PIER AT CLEMSONUNITS 17-24 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SHEET 1 OF 7 SURVEYING, INC.ATLAS 4BDRM 4BDRM 4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 54 55 56 57 58 59 60 63 64656667686970 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 54 55 56 57 58 59 60 61 62 63 64656667686970 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 90 91 92 93 94 95 96 18 36 37 383940414243 44 45 46 47 48 49 50 51 52 53 9798 99 100 101 102103 104 105 106109 110 111 112 113 4BDRM 4BDRM 4BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 5BDRM 4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 6BDRM 6BDRM 6BDRM6BDRM 6BDRM TRACT 1N/FCORE SVA SENECAEDINBURG LLC N/FCORE SVA SENECAEDINBURG LLC 66' R/W (PB:499 PG:8) PORT SETON RD50' R/W (PB:499 PG:8) PORT SETON RD50' R/W (PB:499 PG:8) HADDINGTON WAY50' R/W (PB:499 PG:8) TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC HADDINGTON WAY50' R/W (PB:499 PG:8) GREY FRIARS CT50' R/W (PB:499 PG:8) BROAD MEADOW DRIVE50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT 2N/FCORE SVA SENECAEDINBURG LLC U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) PREPARED FOR:CORE SPACESTRACT 1THE PIER AT CLEMSONUNITS 54-96 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SHEET 2 OF 7 SURVEYING, INC.ATLAS SHEET 3SHEET 4 SHEET 3SHEET 2 SANITARY SEWERLIFT STATIONN/FCORE SVA SENECAEDINBURG LLC 4BDRM 4BDRM4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM4BDRM 4BDRM 4BDRM 4BDRM4BDRM4BDRM4BDRM4BDRM4BDRM 4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) 55 56 57 58 59 60 63 6465 55 56 57 58 59 60 61 62 63 6465 22 23 24 36 37 383940414243 44 45 46 47 48 49 50 51 23 24 25 262728 29 30 31 32 3334 354BDRM PORT SETON RD50' R/W (PB:499 PG:8) HADDINGTON WAY50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT AAKA THE PIERN/FCORE SVA SENECAEDINBURG LLC U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) NORFOLK SOUTHERN RAILROAD100' R/W (PB:499 PG:8) RAILROAD CLEARING PRIVILEGE AREA(PB:499 PG:8) PREPARED FOR:CORE SPACESTRACT 2THE PIER AT CLEMSONUNITS 25-53 & 97-109 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SURVEYING, INC.ATLAS SHEET 3 OF 7 SHEET 3SHEET 4 SHEET 3SHEET 2 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 54 55 56 57 58 59 60 90 91 92 93 94 95 96 54 55 56 57 58 59 60 61 90 91 92 93 94 95 96 45 46 47 48 49 50 51 52 53 9798 99 100 101 102103 104 105 106 107 108 109 110 111 112 113 4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 6BDRM 6BDRM 6BDRM6BDRM 6BDRM HADDINGTON WAY50' R/W (PB:499 PG:8) HADDINGTON WAY50' R/W (PB:499 PG:8) GREY FRIARS CT50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT 3AN/F CORE SVA SENECA EDINBURG LLC #2 COMMON AREAPARK #2 COMMON AREA U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) U.S.GOVERNMENTLAKE HARTWELL(PB: B580, PG: 3-4) PREPARED FOR:CORE SPACESTRACT 2THE PIER AT CLEMSONUNITS 25-53 & 97-109 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SHEET 4 OF 7 SURVEYING, INC.ATLAS SHEET 3SHEET 4 SHEET 4SHEET 5 4BDRM 4BDRM 4BDRM 85 86 87 88 89 9085 86 87 88 90 99 100 101 102103 104 105 106 107 108 109 110 111 112 113 114115116117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136153 154 155 156 157 158 159 160 5BDRM 5BDRM 5BDRM 5BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 6BDRM 6BDRM 6BDRM6BDRM 6BDRM 6BDRM6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM ULSTER DRIVE CL50' R/W 4BDRM TRACT 6N/FCORE SVA SENECAEDINBURG LLC #1 COMMON AREACORE SVA SENECAEDINBURG LLC HADDINGTON WAY50' R/W (PB:499 PG:8) GREY FRIARS CT50' R/W (PB:499 PG:8) BROAD MEADOW DRIVE BROAD MEADOW DRIVE50' R/W (PB:499 PG:8) ULSTER DRIVE50' R/W (PB:499 PG:8) TRACT 2N/FCORE SVA SENECAEDINBURG LLC TRACT 3AN/F CORE SVA SENECA EDINBURG LLC TRACT 3BN/FCORE SVA SENECAEDINBURG LLC #2 COMMON AREAPARK #2 COMMON AREAPARK ROPES ALY50' R/W (PB:499 PG:8) PREPARED FOR:CORE SPACESTRACT 3A & 3BTHE PIER AT CLEMSONUNITS 110-129 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SHEET 5 OF 7 SURVEYING, INC.ATLAS SHEET 4SHEET 5 SHEET 5SHEET 6 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 6BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM 4BDRM4BDRM 4BDRM 4BDRM ULSTER DRIVE CL50' R/W 4BDRM TRACT 6N/FCORE SVA SENECAEDINBURG LLC #1 COMMON AREAN/FCORE SVA SENECAEDINBURG LLC ULSTER DRIVE66' R/W (PB:499 PG:8) TRACT 10N/FCORE SVA SENECAEDINBURG LLC EDINBURGH WAY66' R/W (PB:499 PG:8) ULSTER DRIVE50' R/W (PB:499 PG:8) ULSTER DRIVE50' R/W (PB:499 PG:8) TRACT 3BN/FCORE SVA SENECAEDINBURG LLC TRACT 9N/FCORE SVA SENECAEDINBURG LLC N/FCORE SVA SENECAEDINBURG LLC QUEENS PARK LOOP50' R/W (PB:B545 PG:3) QUEENS PARK LOOP50' R/W (PB:B545 PG:3) PREPARED FOR:CORE SPACESTRACT 10, #1 COMMONAREA AND TRACT 6THE PIER AT CLEMSONUNITS 130-181 CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SURVEYING, INC.ATLAS SHEET 6 OF 7 SHEET 5SHEET 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM 9BDRM TRACT 11N/FCORE SVA SENECAEDINBURG LLCN/FPOINTE WESTDEVELOPMENT LLC JP STEVENS ROAD66' R/W (PB:B545 PG:3) JP STEVENS ROAD66' R/W (PB:B545 PG:3) ABERLADY66' R/W (PB:499 PG:8) EDINBURGH WAY66' R/W (PB:499 PG:8) CERTIFICATE OF AUTHORIZATIONSOUTH CAROLINA SOUTH CAROLINAPROFESSIONAL LAND SURVEYORBARRY O. BARTHOLOW SITE SURVEYING, INC.ATLAS SHEET 7 OF 7 PREPARED FOR:CORE SPACESTRACT 11THE PIER AT CLEMSONUNITS 1-16

Source: Oconee County website. First collected Nov 21, 2026.