RecordWell Data

Pickens County Council Public Hearing and Work Session — Agenda Packet

Pickens County · Pickens County · Pickens County Council · meeting of Nov 30, 2026 · Agenda packets

Open the original document More from Pickens County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

222 MCDANIEL AVENUE, B-1 ∙ PICKENS, SC 29671 ∙ 864.898.5856 ∙ WWW.CO.PICKENS.SC.US COUNCIL MEMBERS Alex Saitta, Chairman Chris Lollis, Vice Chairman Dale Holloway, Vice Chair Pro-Tem C. Claiborne Linvill Scott Lang Chris Bowers COUNTY ADMINISTRATOR Ken Roper CLERK TO COUNCIL Jessica Varney PICKENS COUNTY COUNCIL MID-MONTH MEETING Monday, November 30, 2026 6:30 PM Main Conference Room, County Administration Facility 222 McDaniel Avenue, Pickens SC 29671 1. WELCOME AND CALL TO ORDER: INVOCATION: PLEDGE OF ALLEGIANCE: Chairman Alex Saitta Councilor Chris Bowers Councilor Chris Bowers 2. ORDINANCE No. 695: a) Consideration of Motion to Take from the Table b) Staff Presentation Regarding Minimum Open Space Lot Requirements c) Second Reading of Ordinance No. 695 to Amend the Unified Development Standards Ordinance to Clarify Language Regarding the Road Ordinance, Open Space Subdivisions and Other Matters Related Thereto d) Public Hearing for Ordinance No. 695 to Amend the Unified Development Standards Ordinance to Clarify Language Regarding the Road Ordinance, Open Space Subdivisions and Other Matters Related Thereto 3. OTHER AGENDA ITEMS: a) Duke Grant Allocation for Emergency Management b) Dacusville Community Center HVAC Request c) Budget Workshop and Council Goals 4. ADJOURN Page 1 of 71 AGENDA ITEM: 2c PICKENS COUNTY COUNCIL MEETING SUPPORTING DOCUMENTATION Meeting Date: November 30, 2026 Agenda Item: 2c Department: Planning/Engineering Prepared By: Allison Fowler, Assistant Administrator Subject: 2nd Reading of Ordinance No. 695 to Amend the Unified Development Standards Ordinance to Clarify Language Regarding the Road Ordinance, Open Space Subdivisions and Other Matters Related Thereto Summary: Clarify/Amend references to the now removed Article 10 to instead reference the Road Ordinance (No. 672), clarify language regarding open space and conservation easements related to Open Space Subdivisions in Article 5 Documents Included: 2nd Reading Draft Recommendation from Planning Commission Action Requested: Approval Staff Recommendation: Approve as Presented Previous Council Action (if any): Additional Notes: • Recommendations from staff through the UDSO Ad Hoc Committee • Planning Commission Public recommendation from November 9th hearing Page 2 of 71 Planning Commission 222 MCDANIEL AVENUE, B-10 • PICKENS, SC 29671 • 864.898.5956 • WWW.PICKENSCOUNTYSC.GOV MEMBERS PETER GREENBERGER, District 4 Chair JESSICA MASSEY, District 6 Vice Chair ERIN GRIFFIN, District 1 MIKE MCCLURE, District 2 RON CHRISTIAN, District 3 KELSEY CROOKS, District 5 ELIZABETH VOGT., At-Large November 9, 2026 Subject: Formal Recommendation for Adopting Text Amendments to the Unified Development Standards Ordinance Dear Members of the Pickens County Council, The Pickens County Planning Commission respectfully recommends the adoption of text amendments to the Unified Development Standards Ordinance (UDSO). These proposed amendments include the addition of references to Chapter 8, Section 8-4 of the Pickens County Code of Ordinances in Article 9, clarifications concerning Open Space within Article 5, and proposed amendments within Articles 3, 4, 5, 11, 12, and 16 to enhance alignment with Ordinance 672. On November 9, 2026, the Planning Commission unanimously recommended that the County Council approve all three proposed amendments. Staff members are available to provide any clarification or answer questions regarding this recommendation. Sincerely, Pickens County Planning Commission Page 3 of 71 Ordinance No. 695 Purpose: Staff is proposing the amendments in Ordinance No. 695 primarily to update the Unified Development Standards Ordinance (UDSO) following the removal of Article 10 and the enactment of the Road Ordinance (Ordinance No. 672) from November 2025. Key Reasons for the Proposed Amendments 1. Replacing Obsolete References to Article 10: o Pickens County previously deleted Article 10 in its entirety and established road standards under Chapter 32 of the Pickens County Code of Ordinances (Ordinance No. 672) o Staff is proposing Ordinance No. 695 to clarify outdated references across the UDSO so that all road- related provisions point directly to Ordinance No. 672 instead of the deleted Article 10. 2. Aligning Technical & Procedural Standards Across the UDSO & Road Ordinance: o Removing Article 10 left multiple sections of the UDSO out of sync with current road regulations. The proposed ordinance updates Articles 3, 4, 5, 11, 12, 15 and 16 to ensure explicit alignment with Ordinance No. 672. 3. Clarifying Open Space Subdivision Regulations: o Substantive change: staff is proposing specific revisions in Article 5 to clarify language governing open space and conservation easements for Open Space Subdivisions, ensuring that individual lots are not used to meet open space and conservation requirements. The proposed amendments represent formal recommendations developed by staff through the UDSO Ad Hoc Committee to ensure administrative consistency between the UDSO and the Road Ordinance. Page 4 of 71 Article 5 Subdivisions Pickens County UDSO: Amended 2/16/10, 9/19/16, 4/1/24 505 (b) Open Space Subdivisions shall use the following ratio of open space: • 50% of the total acreage in the Appalachian Heritage area, • 40% of the total acreage in the Agricultural Heritage Area, • 40% of the total acreage in the Natural Heritage Area, • 30% of the total acreage in the Community Center Area, • 20% of the total acreage in the Gateway Area. is to be set aside as permanent open space per 507 (a). 506 (a) Quality Development Standards. A master planned development must comply with the open space standards of Section 505(b), and residential development standards, and nonresidential all development standards of Section 507 as a prerequisite for approval. 507 (a) Common oOpen space. Open Space: An area of land or water that is permanently set aside through dedication, designation or reservation to remain in a natural and unimproved state or that may be improved only for active or passive recreation or enjoyment. a. Common Open Space: Land or water areas within a development project that are available to or benefit all occupants of the development on a continuing and permanent basis, such as walking trails, community centers or clubhouses, golf courses and other recreation areas, protected flood plains or wetlands, and fishing or boating lakes. Common open space does not include any streets or public rights-of-way, storm water retention areas or yard areas or landscape areas located on private property. b. Public Open Space: Land reserved for preservation, leisure or recreational use but dedicated in fee simple to a governing body or agency to be responsible for operation and maintenance. Public open space may not be reserved for or dedicated to the exclusive use of the residents of a particular development. Acreage not utilized for residential lots, roadway access and utilities shall be placed in common open space or devoted to recreation amenities. (1) A minimum percent of the gross project site area shall be reserved for common open space, as in accordance with 505(b).follows: no less than twenty percent (20%) of the total site must be set aside as open space Open space must be set aside for conservation, preservation or passive recreational use, such as walking trails and picnicking. Examples of areas to be considered for open space protection are scenic vistas, natural water courses, woodlands, waterfalls, coves, geologic features, wetlands, floodplains, lakes, creeks, and land with slopes exceeding twenty -five percent (25%). (2) Land devoted to stormwater detention facilities may not be counted toward the 20% minimum unless the facility is a permanent lake or pond, and is designed and intended for recreational access and use by the occupants of the development. (3) In Master Planned Developments, additional common open space may be provided and may include active recreation areas for the proposed development, such as swimming pools, tennis courts, community facilities, etc. (4) Required buffers on the perimeter of the property may be included in the minimum open space requirement. (5) While common open space shall not be required to be contiguous, no individual portion of the twenty percent (20%) minimum required open space shall be less than fifty (50) feet wide in its narrowest dimension, except as follows: a. The open space area, by the very nature of its designated boundaries, is less than 50 feet in width. Examples include strips of steep slopes and “fingers” of floodplains that extend up drainage swales. b. Parkways between road travel ways, which must be at least twenty-six (26) feet in width in order to be counted as part of the minimum 20% requirement. (6) No portion of the residential lots shall be credited toward the minimum open space requirement unless the portion is included within the conservation easement. Land area that is set aside, dedicated, or designated to fulfill the minimum requirements for open space in a subdivision or master planned development shall not be included in the calculations for Page 5 of 71 Article 5 Subdivisions Pickens County UDSO: Amended 2/16/10, 9/19/16, 4/1/24 minimum lot size, minimum lot area, or minimum lot dimension requirements for any individual buildable lot , nor shall any part of a required open space tract be included within the boundaries of an individual buildable lot. No portion of any street right-of-way or public or private utility easement shall be credited toward the minimum open space requirements. (7) The required common open space shall be platted at the same time that adjacent residential lots are platted, in whole or in phases. 507 (b) Residential development standards. (1) Every residence must be connected to a public or community water system. (2) The subdivision may be served by a community sanitary sewer system approved by DESDHEC and the applicable sewerage jurisdiction. (3) Recreation amenity (master planned developments). In addition to common open space, every Master Planned Development must contain a community recreation amenity of adequate size or variety to serve the development, such as a community pool, tennis courts, active play area or basketball courts, (4) Private open space required (Master Planned Developments). In a master planned development, every single -family or two-family dwelling on a lot smaller than ten thousand (10,000) square feet, and every townhouse dwelling shall have a minimum four hundred (400) square foot private yard or patio. a. The private yard or patio shall be arranged for use by the occupants of the dwelling and located in the side or rear yard. b. The private yard or patio must be enclosed by any combination of the following: a masonry wall, wood fence, trellis or lattice with a minimum height of six (6) feet; or an evergreen hedge, shrubs or trees that will achieve a height of six (6) feet within 3 years of planting under normal growing conditions. (5) Lots within the subdivision shall be serviced with underground utilities (electric power, natural gas, telephone, TV cable , etc.). (6) All dwelling units shall have front, side and rear façades matching a common theme or architectural detail tha t is consistent throughout the development. While it is the intent for all dwellings to be sided entirely of brick, stucco or stone finish, or painted wood or fiber cement lap siding (such as Hardiplank), vinyl siding may be used, provided it is certified by the Vinyl Siding Institute and is installed by an installer certified and recognized by the VSI. (7) All single-family detached dwellings must include at least a 2-car garage. Page 6 of 71 Article 3 Amendments: 315 (c) Apartment/Condominium Developments (1) Density a. Density of an apartment or condominium development shall not exceed four (4) units per acre when served by a community on-site septic system and shall not exceed eight (8) units per acre when served by a public sewer system in the Appalachian, Agricultural, and Natural Heritage areas. Units may not be served by individual on-site systems. Parcels with access to public water and public sewer in the Community Center area shall mirror density standards of the adjacent municipality. Parcels with access to public sewer in the Gateway area shall be allowed a density of forty (40) units or one hundred twenty (120) bedrooms per acre and shall be allowed a height of five (5) stories. 1. Exception a) When a property and development is served by and has direct access and frontage onto a four (4) lane, divided, minor arterial as defined in Section 1010(b) of this development ordinance Ordinance 672, project density shall not exceed sixteen (16) units per acre. b) The development must be served by public water and public sewer. c) Design standards 1) All buildings or structures shall utilize a common architectural theme that is consistent throughout the development 2) All buildings or structures should be sided entirely of brick, stucco, or stone finish, or painted wood or fiber cement lap siding (such as Hardiplank). 3) No less than twenty percent (20%) of the gross site must be devoted and set aside for the recreation amenities listed in 314(a)(1). Article 4 Amendments: 403 (b) Minimum frontage. (1) Every lot and every multi-family or nonresidential development shall have a minimum of forty (40) feet of direct frontage onto an existing County or State maintained road. (2) For lots fronting on a newly constructed road built to County road standards or built utilizing the private residential acces s standards as set forth in Article 10Ordinance 672, each lot shall have a minimum of thirty (30) feet of direct frontage. (3) Flag lots are permitted with the following restrictions: a. The width of the pole or road frontage of the lot must be a minimum of twenty -five (25) feet. b. For subdivisions with less than ten (10) lots, one flag lot is permitted per the total number of lots. c. For subdivisions with ten (10) or more lots, no more than ten percent (10%) of the total number of lots in a subdivision may be flag lots. 409 (b) Accessory structures. Minimum setbacks for accessory structures shall be as follows: (1) Fences and Free-Standing Walls. There shall be no minimum setback for fences or freestanding walls, provided that no fence or freestanding wall shall be placed within any street right-of-way or public access easement, nor shall they obstruct visibility at street intersections (see the Sight Triangle provisions under Article 10Ordinance 672). Page 7 of 71 (2) All Other Accessory Structures. All other accessory structures not listed above must be at least twenty (20) feet from any street right -of-way and at least five (5) feet from any other property line (except driveways that connect to a street or adjoining property. (3) Accessory structures shall not encroach upon any easement. Sec. 411 Setbacks along non-delineated right-of-ways. Where a designated and conveyed right-of-way exists along the respective roadway, the edge of the designated and conveyed right -of-way shall be used for the purposes of this Article. However: (1) On State and County roads that do not have clearly established or conveyed rights -of-way, a Constructive Right-of-Way shall be assumed where the center of the right-of-way width shall be measured from the center of the vehicular roadway. (2) The applicable right -of-way width shall be dependent, at a minimum, upon the respective street classification and Table 1.2 set forth in Ordinance 67210.2. Where SCDOT or Pickens County has specified a larger right-of-way width than those listed in the applicable table, the specified, larger dimension must be used. (3) Existing buildings and structures in the Constructive Right-of-Way are deemed non-conforming,but may not be replaced or rebuilt without meeting the requirements of this Article, except as stated in Sec. 412 below. Article 5 Amendments: 502 (a) Minor subdivision. A “minor subdivision” is one in which no improvements (such as new streets, stormwater drainage facilities or public utilities) are to be made. Minor subdivisions are defined as any one of the following: (1) Combinations/Recombinations. a. The combination or recombinations of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards of the County and in accordance with the provisions of this Development Standards Ordinance. (2/16/10) b. The combination or recombination of entire lots of record where no new street or change in existing streets is involved. (2) Non-Developable/Non-Buildable Lot for Sale/Transfer The sale of a proposed vacant parcel, or vacant portion of a parcel, for which no new streets, new utility improvements, or no new sanitary sewer or approval of a septic tank is required (the parcel or portion thereof does not meet the minimum lot size or access requirements of this Development Ordinance) . Any plat for such sale or transaction must first be presented to the Planning Department for review and approval . The following caption must be clearly and predominately affixed onto the plat by the surveyor: “The tract(s) depicted on this plat are not eligible for connection to a sanitary sewer system or for septic tank approval nor shall building permits, certificates of occupancy or any other development permit be issued, nor shall any person construct or install upon this tract any building or structure until it has been combined with another tract in a manner that creates a conforming tract or resubdivided in accordance with the UDSO, as amended.” (9/19/16) (3) Multiple Lot Rural Split. The subdivision of an original tract that creates no more than 3 lots, building sites, or other division (including the remaining portion of the original tract). Each lot shall front on an existing public road meeting the requirements of Sec.1010 Ordinance 672 or be accessed by a shared driveway as outlined in Sec. 1012(a) Ordinance 672 of this Page 8 of 71 development ordinance. Lots sizes and setbacks are as noted in Article 4. Any lot created under this category, including the remainder of the original tract, may not be further subdivided except as a major subdivision. (4) Large lot subdivision. The subdivision of an original tract that creates any number of lots that are 5 acres in size or greater (including the remaining portion of the original tract) where no new street is involved . Any lot created under this exemption, including the remainder of the original tract, may not be further subdivided except as a major subdivision. (5) All subdivisons are subject to the Traffic Study Policy adopted by County Council which can be found in the Appendix of this Development Standards Ordinance.Ordinance 672. 505 (e) All projects must adhere to sidewalk construction standards governed by Section 32 -119 of Ordinance 672. provide a 4’ minimum sidewalk along any road frontages that have at least one curb cut every 300’. Article 11 Amendments: 1102 (b) Development phase inspections. 1) Requests for inspections shall be made by the owner or contractor to the County Engineer at least twenty-four (24) hours prior to when the inspection is needed. Inspections shall be made and passed prior to continuation of further activity or proceeding into new phases. These inspections shall be conducted by the project design engineer, their representative, or geotechnical firm(s). Completion of the inspections and approval to move to the next phase shall be confirmed with certification letters submitted to the Pickens County Engineering Department. Requests for the County Engineering Department to be present during inspection shall be made at least forty -eight (48) hours prior to when the inspection is needed. Inspections are required of each of the following phases, as applicable to the actual work to be performed under the development permit: a. Prior to clearing or clearing and grubbing of the property or any portion included under the development permit, inspection of erosion and sedimentation control measures and protective devices for undisturbed areas. Inspection of erosion and sedimentation control measures will be conducted on a continuing basis by the County Engineer and Stormwater Manager b. Upon completion of street grading, inspection and approval shall be required prior to trenching or continuation with subgrade preparation. c. Upon installation of storm drainage pipe, detention, or other storm water facilities, inspection and approval shall be required prior to continuation with subgrade preparation. d. Street curbing and gutter (if provided). Inspection shall be requested after the sub - grade is compacted and forms or string line have been set. Street width and vertical and horizontal alignment may be spot checked. e. Sub-grade of streets. After compaction, the sub-grade may be roll tested with a 20-ton tandem dump truck, loaded to maximum, legal capacity, and shall pass to the satisfaction of the County Engineerinspector. This inspection can be completed by the project design engineer, their representative, or a geotechnical firm. If deemed necessary by the inspector, additional tests in accordance with Sec. 1107(f)Ordinance 672 will be required. f. Street base. The base shall be string-lined for depth and crown. The street base shall be roll-tested with a 20-ton tandem dump truck, loaded to maximum, legal capacity, and shall pass to the satisfaction of the County Engineerinspector. This inspection can be completed by the project design engineer, their representative, or a geotechnical firm. If deemed necessary by the inspector, additional tests in accordance with Sec. 1107(f) Ordinance 672 will be required. g. Paving. Page 9 of 71 1. The County Engineer mayproject design engineer, their representative, or a geotechnical firm shall be on site during the paving process to check consistency, depth, and workmanship, as applicable. The County Engineering Department may also be onsite during the paving process. For asphalt paving, the temperature of the material will be monitored and the street may be cored after completion to check thickness and density. Satisfactory test results of the cores shall be delivered to the County Engineer prior to approval of a final subdivision plat or certificate of occupancy. Sec. 1103 Site clearing and grading. 11037 (gk) Burial of construction debris. No debris of any kind shall be buried at the site of any construction or development Sec. 1106 Installation of stormwater drainage facilities. Stormwater control facilities shall be governed by the Pickens County Stormwater Ordinance, and accompanying Stormwater Design Manual, and Ordinance 672. Sec. 1107 Installation of streets and utilitiesRefer to Ordinance 672 for Installation of streets and utilities. 1107 (a) Grading. 1)All streets shall be graded to their full width by the developer so that pavement extensions or sidewalks, where required o r if installed in the future, can be constructed on the same level plane. 2) Preparation of roadway: Before grading is started the entire area to be paved shall be first cleared of all stumps, roots, brush and other objectionable materials. In all areas to be graded or filled, the developer shall stockpile the topsoil later to be spread in all disturbed areas not paved. 3) Grading shall be done in accordance with the Site Clearing and Grading Section of this Article. 1107 (b) Installation of utilities; general. 1)After grading is completed and approved, the curb lines shall be staked by the developer’s Registered Land Surveyor. Before any base is applied, all of the underground utilities—water mains, sewer mains, gas mains, or any other underground utilities, and all service connections related thereto, that will be located under the street base shall be installed completely and provided throughout the length of the street and across the flat section. Service connections for sanitary sewer (if required) and water shall be extended to the right-of-way lines. 2) All utility manholes and valve boxes shall be brought to the finished grade within the roadway section. 3)All utility locations shall correspond to the typical cross-sectional layout included in the Pickens County Standard Design Specifications. 4)No private improvements, such as private lawn sprinkler systems, yard lighting, and the like, shall be installed within a p ublic right-of-way except by authorization of the County Engineer. Such authorization, if issued, shall require the owner to assume all repair costs of the owner’s facilities should they become damaged. 1107 (c) Installation of public water system. If a public water system is to be installed, the improvements are to be reviewed, approved and inspected by the providing jurisdiction. Installation shall be coordinated with the construction of streets under the County’s direction, as applicable. 1107 (d) Installation of sanitary sewerage. Commented [RR1]: 1107(k) will stay in UDSO, but probably needs to be moved to another section Commented [RR2]: All specifications in Sec. 1107 are to be moved to Ordinance 672 Page 10 of 71 1) Approval and permitting. 2) If a public sanitary sewerage system is to be installed, the improvements are to be reviewed, approved and inspected by the providing jurisdiction. Installation shall be coordinated with the construction of streets under the County’s direction, as applicable. 3) Replacement of pavement. a. General. Contractor shall fully restore and replace all pavement, curbs, gutters, sidewalks and other surface structures removed or disturbed, to a condition that is as near original condition as possible. b. Pavement cuts. i.All pavement cuts on County streets or roads shall be made by sawing prior to excavation to eliminate uneven and ragged edges. ii. All road cuts shall have a six (6) inch thick concrete cap (3,000 psi in 28 days) which shall extend not less than 12 inches beyond the edges of the back-filled ditch. iii.Final asphalt patches shall match the existing pavement type but be no less than 1½ inches thick. Special care shall be exercised to match existing slopes and grades for a smooth transition. c.Pavement replacement. Where sewer lines are installed in existing paved streets, the streets in which the sewer lines are installed shall receive a full width asphalt repaving in accordance with these specifications. 4) Location and protection of existing underground utilities. 5) It is the responsibility of the contractor to locate all underground utilities and to protect same. Utility lines or services damaged by the contractor shall be repaired by the contractor at the contractor’s own expense. 1107 (e) Street installation. 1)After the earth work has been completed, all storm drainage and other underground utilities have been installed under the roadbed, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades and cross section shown on the plans. 2) If any sections of the subgrade are composed of unsuitable or unstable material, such material shall be removed to the depth directed by the County Engineer and replaced with suitable, thoroughly compacted material. 3) Preparation of subgrade. a. Prior to placement of the street base, the subgrade shall be compacted to 95% density. b. When the street is to be used for construction traffic before the paving work is completed, a layer of No. 3 stone can be laid as a traffic surface if the developer so desires. c. This material shall not be used as part of the base material. d. It may be worked into the subgrade; or it shall be removed before the base course is set up for paving. e. Provision shall be made to drain low points in road construction when the final paving surface is delayed. 1.Provide break in the berm section when the curbing has not been constructed. 2.Use 6-inch pipe sections to provide drainage under curb to side slopes. (4) Abutting property shall be suitably sloped to the right-of-way line. 4) Street base, curbing and paving. Street base, curbing and paving shall be installed by the developer in accordance with the requirements and standards of this Development Standards Ordinance. 1107 (f) Testing requirements; streets. Page 11 of 71 When testing is required by the County Engineer, it is the responsibility of the developer to insure that all required tests are made and reported to the County Engineer. The cost of all testing and quality control shall be performed at the expense of the developer by qualified testing laboratories. Table 11.2: Testing Requirements 1107 (g) Protection of shoulders. 1) Immediately after grading and filling and re-spreading of topsoil, all areas of disturbed soil shall be fertilized and seeded (or in steep areas sodded or otherwise appropriately treated) with suitable vegetative cover to retard erosion. 2)When all construction is completed, all slopes and shoulders shall be cleared of all rubbish and shall have a stand of grass to prevent undue erosion, either by sprigging, sodding, or seeding. 1107 (h) Traffic control devices. Street signs, traffic control signs, and devices such as striping and signalization, shall be provided through payment of fee s to the County Engineer. 1107 (i) Foreign material on streets. 1) The developer, builders, and/or homeowners shall be responsible for keeping dirt, mud, building materials, concrete, etc., off of the pavement and curbing of existing County or County roads during construction of buildings in all developments covered by these regulations. 2)Before the streets are accepted by Pickens County, all litter and trash shall be removed from the dedicated rights -of-way and surrounding areas. 1107 (j) Bridge piling. Bridge piling shall be driven to SCDOT load standards for loading. Certification of pile load shall be by registered Professi onal Engineer. 1107 (k) Burial of construction debris. No debris of any kind shall be buried at the site of any construction or development . 1107 (l) Pavement Cuts. 1) All utility construction plans within County right-of-way shall be reviewed and approved by the County Engineer. 2)All trenches shall be backfilled and compacted the same day the trench is opened. a.Trenches under the paving shall be returned to 95% compaction. The backfill in all such ditches will be thoroughly compacted; the subgrade shall be brought to the lines, grades, and typical roadway section shown on the plans. b. Compaction tests at a rate of one per 150 feet of trench shall be provided to verify compaction. Type of Test to be Performed Minimum Number of Tests Testing Standards Sub-grade Compaction Each 500 linear feet of roadway 95% Max Density ASTM-1557 Field Tests ASTM D-1556 F-2922 and D-2167 Base Compaction East 500 linear feet of roadway 100% Max Density ASTM-1557 Field Tests ASTM D-1556 F-2922 and D-2167 Asphalt Density Each 1,000 linear feet of roadway 92% Laboratory Density Asphalt Thickness Each 500 linear feet of roadway Deficient in thickness no more than ¼” Commented [RR3]: 1107(k) will stay in UDSO, but probably needs to be moved to another section Page 12 of 71 c. Trenches elsewhere shall be returned to 90% compaction. 3)The County’s policy is no existing County roads can be open cut unless unusual circumstances warrant it. Storm sewers thirt y- six (36) inches or smaller shall be bored. Contact the County Engineer for permission to open cut any existing County road. If the County allows open cutting, all trenches under existing paving shall be back -filled and compacted in 6-inch lifts. a. The paving cut shall be widened to a minimum of 12 inches beyond the edges of the trench and excavated to allow for the 6 inches of 3000 psi concrete and 2 inches of asphaltic concrete to be placed. b.The edges of the paving cut shall be smooth. c.A final wearing surface of 2 inches of Type “E” asphaltic concrete shall be poured and rolled after the concrete is cured. Article 12 Amendments: 1211 (a) Driveway permit; when required. 1) No driveway connecting to a public street or a public right-of-way or public property shall be installed without first having approval from the Roads and Bridges Department.having an approved encroachment permit from the Engineering Department. If the driveway connects to a State or U.S. numbered highway, approval of the South Carolina Dept. of Transportation shall be required prior to County approval. 2) Applications may be made to the Planning Engineering Department 1212 (b) Procedures for final plat approval. 1) Prior to submission of an application for final subdivision plat approval, either: a. All public improvements shall have been properly installed and completed in accordance with all requirements and standards of this Development Standards Ordinance and as-built surveys of the improvements shall have been approved by the County Engineer as required in the Land Development Activities Article of this Ordinance; or, b. Partial improvements shall have been completed as specified in Table 1.110.1 approved by the County Engineer as provided under the Land Development Standards Article of this Development Ordinance in Ordinance 672. 2) An application for a final subdivision plat approval shall be made to the Planning Department The application shall include: a. The name and address of the person to whom the notice of approval shall be sent. b. A properly completed application form, as furnished by the Planning Department, requesting final subdivision plat review. c. The final subdivision plat drawing prepared in conformance with the specifications in this Section, the original of which shall be a print or tracing, signed and sealed with the surveyor’s impression seal, in a number of copies required by the Planning Department. (2/16/10) d. The as-built surveys of the improvements as required in the Land Development Activities Article of this Ordinance if the surveys have not been previously received and approved. e. Payment of all applicable final subdivision plat filing and recording fees, as established by the County Council from time to time. f. Executed deeds for the dedication of all street rights-of-way, easements and other public properties. g.f. A maintenance surety. (2/16/10) The 25% maintenance surety shall guarantee normal maintenance of the installed infrastructure . This surety will cover materials, workmanship, and structural integrity until such time as Pickens County accepts and maintains the road . This surety shall run for a minimum of one year from the date of final paving or final plat approval, whichever comes later, and approval of the County Engineer. (2/16/10) h.g. When the subdivision is served by public water, a Final Approval to Place into Operation certification shall be provided from the Department of Health and Environmental Control Environmental Services certifying that the infrastructure placed with the subdivision is approved for use. i.h. When the subdivision is served by public sewerage a Final Approval to Place into Operation certification shall be provided from the Department of Health and Environmental Control Environmental Services certifying that the infrastructure placed Page 13 of 71 with the subdivision is approved for use. j.i. Where individual septic waste disposal is proposed, a letter of final subdivision approval shall be submitted from the appropriate division of the Department of Health and Environmental Control Environmental Services identifying each lot for which individual waste disposal is approved. Areas or lots not so approved shall not be included on the final plat unless restricted to prohibit construction of any structure thereon by such notation as ―reserved exclusively for open space, etc. 3) The Planning Department shall review the application for completeness at the time of submission. Incomplete applications will be returned to the applicant. 4) Within 2 weeks following receipt of the application, the Planning Department shall indicate on the drawing or in writing all comments related to compliance with this Development Code. The Planning Department shall have sole authority to determine the applicability of any provisions of this Development Standards Ordinance to the final plat. 5) The owner shall be responsible for compliance with all codes and regulations and for the satisfaction of all the noted and written comments of the Planning Department Resubmission of all revised drawings shall be made to the Planning Department 6) When all of the requirements of this Development Ordinance, and any conditions of land use approval, have been met, the Planning Department shall sign and date the CERTIFICATE OF FINAL PLAT APPROVAL stamped or printed on all submitted originals of the final subdivision plat. (2/16/10) 7) Once the final subdivision plat has been so certified, it shall be recorded by the applicant with the Register of Deeds. 8) The Planning Department will forward the executed deeds for the streets, easements and dedication of other public properties, if applicable, to the County Council for approval and recording. 9)8) Subsequent to the recording of the final plat, one additional hard copy with all certificates endorsed thereon shall be filed with the records of the Planning Department the Map book, volume and page numbers where the plat is recorded shall also be indicated on the copy. 1212 (i) Acceptance of public improvements. 1) If construction of any required public improvements was deferred at the time of final plat approval, said work must be completed to the satisfaction of the County Engineer. 2) The developer initially shall obtain a maintenance bond or other surety per the requirements of Section 1102(e) for a one - year period commencing on the date of final plat recordation; an additional one-year bond or other surety shall be obtained commencing on the date of completion of any improvements deferred at the time of final plat recordation. 3) Prior to expiration of the maintenance period, a final acceptance inspection of the public improvements shall be conducted by the County Engineer. 4) The owner must correct all defects or deficiencies in materials or workmanship and make such repairs as necessary to approximate the as-built condition of the improvements. 5) Upon certification by the County Engineer that the public improvements depicted on the as -built surveys are in conformance with the specifications of this Development Ordinance and are in good repair, the County Engineer shall recommend the release the maintenance bond and recommend to the County Council that all public improvements be accepted into perpetual maintenance. a. The executed deeds for the streets, easements, and dedication of other public properties, if applicable, shall be forwarded to the County Council for approval and, upon approval, submitted to the Register of Deeds for recording in conjunction with the recommendation for public acceptance. a.b. Roadways for multiple phase subdivisions shall not be considered for acceptance into the County maintenance system until such time when no further roadway construction leading from such roads will take place. Article 15 Amendments: 1503 (c) County Engineer. 1) The County Engineer, or their designee, is responsible for the review of submittals related to the construction of development projects and the construction of streets, drainage facilities and other activities within public rights of way. Page 14 of 71 2) The County Engineer, or their designee, is responsible for enforcement of all requirements and restrictions of this Development Standards Ordinance relating to the engineering design of subdivision improvements and development projects, the construction of streets and stormwater management systems, their continued maintenance and operation, and coordination of the installation of certain public utilities. Article 16 Amendments: Common Drive: A privately owned and maintained right-of-way or easement that is constructed to the standards set forth in Section 1012(b) and provides vehicular access and road frontage to no more than ten (10) lots or building sites. Private Road: A privately owned and maintained right-of-way that is constructed to the standards set forth in Section 1012(c) Ordinance 672 and provides vehicular access and road frontage to multiple lots or buildings. Shared Driveway: A privately owned and maintained easement that is constructed to the standards set forth in Section 1012(a)Ordinance 672 and provides vehicular access and road frontage to no more than three five (53) lots or building sites. Street Classifications: See Section 1010 (b)Ordinance 672. Commented [SH4]: No longer used term within 672 or UDSO. Commented [RR5R4]: I wonder if UDSO should just reference Ordinance 672 and not the Section. That way, if the section numbers ever change, the UDSO doesn't have to be updated. Page 15 of 71 1 STATE OF SOUTH CAROLINA ) ) ORDINANCE #___________________ COUNTY OF PICKENS ) AN ORDINANCE PROVIDING FOR CERTAIN AMENDMENTS TO PICKENS COUNTY CODE OF ORDINANCES RELATED TO THE EFFICIENT, SAFE OPERATION AND MAINTENANCE OF THE COUNTY ROAD SYSTEM AND MATTERS RELATED THERETO. WHEREAS Pickens County, South Carolina (the “County”) is a political subdivision of the State of South Carolina and is thereby authorized to enact regulations, resolutions, and ordinances, not inconsistent with the Constitution and general law of this State, including the exercise of these powers in relation to health and order in counties or respecting any subject as appears to them necessary and proper for the security, general welfare, and convenience of counties or for preserving health, peace, order, and good government in them; and WHEREAS, the County operates and maintains a system of highways, roads, and streets; and finds that the efficient and safe operation of this system requires certain amendments to the County's existing Code of Ordinances to further promote health, peace, order, and good government within the County; NOW THEREFORE, BE IT ORDAINED that the Pickens County Code of Ordinances be amended as follows: The provisions of Article 10 of the United Development Standards Ordinance as amended (the "UDSO") are hereby deleted in their entirety, and replaced with the following provisions: Article 10. The provisions of Article IV of Chapter 32 of the Pickens County Code of Ordinances, as amended (the "Road Ordinance") are incorporated herein by reference, and all standards and requirements set forth in the Road Ordinance shall control any determinations made under the UDSO on matters to which they relate." The provisions of Section 32-101 is hereby amended as follows: Sec. 32-101(c) The County shall be the final authority for approving or denying the connection of new streets or roadways, whether inside or outside the County's jurisdiction, to an existing street or roadway within the jurisdiction of the County. The provisions of Sections 32-151 through 32-155 (Division 4, Roads) of the Pickens County Code of Ordinances are hereby repealed in their entirety and replaced with the following language: Sec. 32-151 – Purpose This division is enacted to provide for the continued maintenance of existing roadways that were previously admitted into the County Road System but do not meet the requirements of Division 2 of this Article. Sec. 32-152 – Restrictions On existing dead-end roads, where the roadway ceases to serve more than one residence or continues solely onto the property of a single property owner situated at the end of the road, the County shall determine the exact point at which County maintenance terminates. No County- maintained roadway may be barricaded in any way and may not be posted with any type sign such as "private", "posted", "keep out" or any other similar wording. The roadway shall remain open at aIl times for public use, subject to applicable local, state, and federal laws. The Page 16 of 71 2 termination point of County maintenance shall be documented in the County's official road inventory and GIS system for recordkeeping and public reference. Sec. 32-155 – General procedures A. Definition. Roadways previously accepted into the county road maintenance system under prior policy are hereby designated as "minimum maintenance roads". These roads will be classified separately from all other roads within the County Road system and from those accepted under the provisions of Division 2 of this Article. B. Minimum maintenance designation shall remain in effect until such time as the property owners pay the full cost of improvements necessary to bring the roadway into compliance with the standards of Division 2 of this Article. The petitioning property owners shall be solely responsible for all required surveys, deeds and costs associated with any rights-of-way or related agreements. C. Minimum Maintenance Roads shall receive the lowest priority for County maintenance services. Expenditures for materials and labor shall be limited to the minimum necessary to maintain reasonable public access and safety. The provisions of Chapter 32- Roads and Bridges, of the Pickens County Code of Ordinances, are hereby amended to include the following new section: Sec. 32-2 – County Road System A. Definition. The Pickens County Road System shall consist only of those public roads and rights-of-way formally accepted by Pickens County Council for County maintenance. Roads that are part of the State Highway System, located within the limits of a municipality, or private in nature are not County roads. Under S.C. Code § 5-27-120, streets within municipal limits are maintained by the municipality. B. Official Inventory. The Roads & Bridges Department and GIS Department shall maintain a joint written and electronic inventory of all roads in the County Road System, showing the name, location, and legal basis for acceptance. C. Establishment and Adoption. The inventory shall be verified by the Roads & Bridges Department, GIS Department, and County Attorney using recorded instruments, plats, court orders, and Council actions. Once verified, the inventory shall be presented to County Council for adoption by resolution and published once each week for three consecutive weeks. Only the adopted inventory shall constitute the official County Road System. D. Additions and Deletions. Roads may be added or removed only by formal action of County Council following the procedures for dedication, abandonment, or relinquishment provided in this Chapter. Maintenance or repair of a road by the County does not constitute acceptance. E. Review. The Roads & Bridges Department and GIS Department shall jointly review and certify the inventory at least annually and submit updates to the County Administrator and County Council. F. Limitation of Responsibility. Inclusion of a road on the County Road System signifies County maintenance responsibility only and does not constitute a warranty of ownership or liability beyond routine maintenance. Routine or emergency maintenance shall not, by itself, constitute acceptance for inclusion in the County Road System. The Provision of Chapter 32 - Roads and Bridges, of the Pickens County Code of Ordinances are hereby amended as follows: Roadway Design Standards and Policies Table of Contents Page Sec. 32-104 Purpose of Roadway Design Standards and Policies 1 Sec. 32-105 Standards incorporated by reference. 1 (a) Standard Design Specifications. 1 Commented [RR1]: Table of Contents to be updated on Final Draft Page 17 of 71 3 (b) Traffic signs and street striping. 1 (c) South Carolina Department of Transportation standard specifications. 1 (d) AASHTO design standards. 1 Sec. 32-106 Interpretation of standards. 1 (a) Governing Standards. 1 (b) Prior Acceptance of Construction Plans. 1 Sec. 32-107 Design exceptions and field changes. 2 (a) Request for Design Exception. 2 (b) Field changes. 2 Sec. 32-108 General design standards. 2 (a) Suitability of the land. 2 (b) Conservation. 2 (c) Conformance to the comprehensive plan and other adopted plans. 2 (d) Name of subdivision or development project. 3 (e) Street names. 3 (f) Street Addresses. 3 (g) Blocks. 3 (h) Lots. 3 Figure 1.1 Lot Layout 4 (i) Areas reserved for future development. 4 (j) Plats & Developments Straddling Political Boundaries. 5 Sec. 32-109 Required improvements. 5 (a) Minor subdivisions. 5 (b) Major subdivisions, multi-family and nonresidentialnonresidential developments. 5 Sec. 32-110 Guarantee in lieu of completed improvements. (2/16/10) 6 (a) Performance Surety. 6 (b) Performance Surety Default. 6 Table 1.1 7 Sec. 32-111 Survey Monuments. 7 (a) Exterior development boundaries. 7 (b) Lot and street corners. 7 (c) Floodplain Elevations. 7 Sec. 32-112 Easements. 7 (a) Utility easements. 8 (b) Pedestrian Easements 8 (c) Drainage and access easements 8 (d) Conservations Conservation easements. 8 Page 18 of 71 4 (e) Overlapping easements. 8 Sec. 32-113 Streets. 8 (a) Access. 8 (b) Street classifications. 9 (c) Traffic Study Policy. 9 (d) Relation to present and future street system. 11 (e) Design standards for streets. 12 Table 1.2: Minimum Right-of-Way Width 12 Table 1.3: Street Grades and Design Speed 13 Figure 1.2 Reverse Curves 14 Table 1.4 Intersection Offset 14 Figure 1.3 Intersection Offsets 14 Figure 1.4 Mitered Right-of-Way 15 Table 1.5: Minimum Sight Distance 15 Figure 1.5 Sight Distance 17 Figure 1.6 Interim Turn-AroundsTurnarounds 18 Figure 1.7 Cul-de-sac Dimensions 19 Figure 1.8 Subsurface Drainage 21 Figure 1.9 Entry Island Layout 21 Figure 1.10 Island Detail 22 Figure 1.11 Intersection/Driveway Grades 23 (f) Street Improvements. 24 Table 1.6: Street Base and Pavement Composition 24 Figure 1.11A Roadway Typical Sections 25 Figure 1.11B Curb & Gutter Typical Sections 26 (g) Substandard streets. 27 (h) Street Abandonment 28 Sec. 32-114 Private residential access. 30 (a) Shared Drive / Common Drive Hybrid. 30 (b) Private Roads 30 Sec. 32-115 Street signs, traffic signs and striping. 31 (a) Street name signs. 31 (b) Traffic Signs. 31 (c) Striping Requirements. 31 Sec. 32-116 Street Lights. 32 Sec. 32-117 Driveway and Development entrances. 32 (a) Driveway access to a State road. 32 Page 19 of 71 5 (b) Driveway access to major County roads. 32 (c) Driveway standards; in general. 32 (d) Residential subdivision entrances. 32 Table 1.7 Driveway Spacing 32 (e) Commercial/Industrial subdivision entrances. 33 (f) Driveways for multi-family and non-residential developments. 33 (g) Maintenance of sight distances. 33 Sec. 32-118 Deceleration lanes and turn lanes. 34 (a) Deceleration lanes; where required. 34 (b) Median breaks. 34 (c) Deceleration and turn lane constructions construction standards. 34 Sec. 32-119 Sidewalks. 34 (a) Sidewalks; where required. 34 (b) Sidewalks; where located. 34 (c) Sidewalks; construction. 35 (d) Crosswalks. 35 Figure 1.12: Crosswalks 36 Sec. 32-120 Location of utilities and street cuts. 36 (a) Location of utilities in streets. 36 Sec. 32-121 Storm drainage. 37 (a) Applicability and exemptions. 37 (b) Standards to be used in designing system. 37 Table 1.9 Surface Water Exit Intervals Sec. 32-122 Public water system. 39 Sec. 32-123 Public sewerage system. 39 Page 20 of 71 6 Roadway Design Standards and Policies Sec. 32-104 Purpose of Roadway Design Standards and Policies. This OrdinanceArticle establishes the comprehensive standards and procedures governing the design, construction, acceptance, classification, maintenance, and abandonment of all public and private roadways, streets, and related infrastructure within Pickens County. It is intended to serve as the unified and controlling authority for all roadway matters under County jurisdiction, ensuring safe, consistent, and coordinated development and management of the County's transportation network. Additionally, this article Ordinance sets out the minimum requirements and standards for construction of subdivisions and other land development projects, including general principles of design and layout and requirements for such public facilities as streets and utilities. Low impact development procedures may be used where practical. Grass swales, pervious pavements and other best management procedures may be used where storm water velocities and quantities allow. Each low impact practice will be approved on a case-by-case basis. Sec. 32-105 Standards incorporated by reference. (a) Standard Design Specifications. The Standard Design Specifications of Pickens County, also referred to in this Ordinance as "Standard Details," as adopted by the County Council and as may be amended from time to time, are incorporated into this Ordinance as though set forth within the body of this Ordinance. In the case of a conflict between the Standard Design Specifications and the text of this Ordinance, the text shall control. (b) Traffic signs and street striping. The installation of all traffic control signs and street striping shall be governed by the standards contained in the Manual on Uniform Traffic Control Devices, latest edition, published by the Federal Highway Administration of the U.S. Department of Transportation. (c) South Carolina DOT standard specifications. Unless otherwise specially set forth in this Ordinance or the Standard Design Specifications of Pickens County, all of the materials, methods of construction, and workmanship for the work covered in reference to street construction and storm drainage construction shall conform to the latest standard specifications of the South Carolina Department of Transportation. (d) AASHTO design standards. Design criteria and standards not specifically set forth herein shall conform to the latest edition of the AASHTO Policy Geometric Design of Highways and Streets. Sec. 32-106 Interpretation of standards. In the interpretation and application of the provisions of these standards, the following shall govern: (a) Governing Standards. Whenever a provision of these standards or any provision in any law, ordinance, resolution, rule, or regulation of any kind contains any restrictions covering any of the same subject matter, the standards that are more restrictive or impose higher standards or requirements shall govern. (b) Prior Acceptance of Construction Plans. Pickens County shall not modify or alter any development plans that have been filed with and accepted by the County prior to the effective date of this code. This exception shall be subject to the conditions and limitations under which said plans were accepted by the County. Sec. 32-107 Design exceptions and field changes. Page 21 of 71 7 (a) Request for Design Exception. When unique conditions and circumstances exist on a project, the developer's engineer may formally submit a request to the County Engineering Department for design exceptions in a format provided by the County Engineer. Design exceptions requestexception requests should be identified as early as possible during the design process. The County Engineering Department is the approval authority for design exceptions associated with this Ordinance. Any design exception request not considered by the County Engineer, or otherwise not approved, may be forwarded to the Planning Commission for their review and consideration. (b) Field changes. Minor changes in construction plans caused by field conditions shall be made at the direction of the County Engineer Design Engineer, or their representative, with the cost of such changes to be paid by the developer. All changes are to be documented as revisions to the approved development plans and correctly shown on the as-built surveys. Discrepancies between the as-built surveys and the approved development plans may result in delays in approvingdelay approval of final plats or certificates of occupancy. Major changes in the construction plans shall be approved by the County Engineering Department. Some major changes may also require Stormwater Management approval. Sec. 32-108 General design standards. (a) Suitability of the land. (1) Land physically unsuitable for subdivision or development because of flooding, poor drainage, topographic, geologic or other such features that may endanger health, life, or property, aggravate erosion, increase flood hazard, or necessitate excessive expenditures of public funds for supply and maintenance of services shall not be approved for subdivision or development unless adequate methods are formulated by the developer for solving the problems. Such land shall be set aside for such uses as shall not involve such a danger. (2) Land within a proposed subdivision or development which is unsuitable for development shall be incorporated into the buildable lots as excess land or may be utilized as open space. Lots that do not comply with the requirements of this Ordinance are prohibited. (b) Conservation. (1) Development shall be planned, designed, constructed, and maintained to avoid substantial probabilities of: a. Accelerated erosion. b. Pollution, contamination, or siltation of lakes, rivers, streams, and other water bodies. c. Damage to vegetation. d. Injury to wildlife and fish habitats. (2) Development shall be planned, designed, constructed, and maintained to provide open space and to create a man-made environment for human use or occupancy compatible and harmonious with the natural environment, and specific consideration shall be given to the preservation of natural topography, to preservation of existing vegetation, to retention of major land formslandforms, and to preservation of important vistas. (c) Conformance to the comprehensive plan and other adopted plans. In addition to the requirements established herein, all subdivisions and individual development projects shall comply with the following laws, rules and regulations: (1) All proposed subdivisions and individual development projects shall conform to the Comprehensive Plan and development policies in effect at the time of submission to the Planning Department. Page 22 of 71 8 (2) All highways, major thoroughfares, streets and other transportation facilities shall be platted by the developer in the location and to the dimension indicated on the Comprehensive Plan or the County Transportation Plan, if applicable, whichever is the most recently adopted or amended. (3) When features of other plans adopted by the County Council (such as school sites or other public-building sites, parks or other land for public uses) are located in whole or in part in a subdivision, such features shall be either dedicated or reserved by the subdivider for acquisition within a reasonable time by the appropriate public agency. a. Whenever a plat or site plan proposes the dedication of land to public use that the County Council finds to be not required or suitable for such public use, the County Council shall refuse to accept the dedication. (4) In subdivisions or developments related to or affecting any State or U.S. numbered highway, the Planning Department shall require the approval of the South Carolina Department of Transportation. (5) Any and all rules of the South Carolina Department of Health and Environmental Control (DHEC), the USDA Natural Resource Conservation Service, and all other appropriate state and federal agencies. (d) Name of subdivision or development project. The name of each subdivision or development project must have the approval of the Planning Department. The name shall not duplicate nor closely approximate the name of an existing subdivision or development project in Pickens County or any of its cities. (e) Street names. (1) Street names. a. Proposed streets obviously in alignment with other existing and named streets shall bear the names of the existing streets. In no case shall the name for a proposed street duplicate existing street names in Pickens County. b. Street names are subject to approval by the E911 Addressing Coordinator. (f) Street Addresses. Street addresses shall be obtained from the E911 Addressing Coordinator and shall be shown upon each final plat. Numbers must be visible from the street. The size of the address numbers must be a minimum of three (3) inches tall. (g) Blocks. (1) Residential Blocks. Unless otherwise approved by the County Engineering Department under unusual circumstances, block lengths shall not exceed twelve hundred (1,200) feet nor be less than four hundred (400) feet in length. a. In blocks greater than 1,200 feet in length, the County Engineering Department may require one or more public easements of not less than twenty (20) feet in width to extend entirely across the block for pedestrian crosswalks, fire protection, or utilities. b. Width: Blocks shall be wide enough to allow two rows of lots, except where reverse frontage lots on major thoroughfares are provided, or when prevented by topographic conditions or size of the property, or for lots along the periphery of the subdivision, or where abutting upon limited access highways or railroads, or where other situations make this requirement impractical, in which case the Planning Department and County Engineering Department may approve a single row of lots. (2) Nonresidential Blocks. Blocks for other than residential use shall be of such length and width as may be suitable for the prospective use, including adequate provision for off-street parking and service. Page 23 of 71 9 (h) Lots. (1) Minimum lot dimensions and areas. All lots shall meet or exceed the area and dimensional requirements of this Development Ordinancethe UDSO. (2) Authority of SCDES. Nothing contained in this Article Ordinance shall be construed as preventing the SCDES, after study of the conditions existing in a proposed subdivision, from requiring that all or any portion of the area of such subdivision shall not be built upon or that the minimum lot sizes set forth in this Development Ordinancethe UDSO are inadequate and must be increased to ensure the protection of the public health. (3) Adequate building sites. Each lot shall contain a site large enough for a normal building that will meet all building setback requirements as set forth in this Ordinance and not be subject to flood or periodic inundation. Figure 1.1: Lot Layout (4) Arrangement. If possible, all lot lines that intersect a street line shall be perpendicular or radial to said street lines unless not practical or desirable because of topographic or other features, such as the location of a stream or other natural feature that more appropriately may define a lot, or a property line that forms the periphery of a subdivision that is not perpendicular or radial to a street line. Exceptions to this requirement must be approved by the Director of Community Development at the time of Preliminary Plat approval or otherwise prior to recordation of the lot. In no case shall a lot be created that would require a variance to provide an adequate area to accommodate a normal principal building. (5) Corner Lots. Corner lots shall be sufficiently large to permit the location of buildings so as to conform to the front building lines on both streets. Page 24 of 71 10 (6) Through lots. Except where specifically required to provide reverse frontage separation from a County road or a State or U.S. numbered highway, or to overcome specific disadvantages of topography and orientation of property, through lots (i.e., "double- frontage" lots) are to be avoided. (i) Areas reserved for future development. If any portion of a tract is reserved for future subdivision development, the minimum lot width and frontage of the reserved area may be reduced to the width required for a future street to serve such area. (1) Such a reserved area must be labeled "Reserved for Future Development" on the final subdivision plat, and the portion of the lot where a street will be built must be labeled "Future Street." (2) Such a reserved area will not be eligible for issuance of a building permit unless the lot meets all requirements of this Development Ordinancethe UDSO, including minimum lot width and frontage requirements. (j) Plats & Developments Straddling Political Boundaries. Whenever access and/or services to a subdivision is required across land in another governmental jurisdiction, the Planning Department may request assurance from the County Attorney, and/or the other county, and/or other municipality that access is legally established, and that the access road is adequately improved. In general, lot lines shall be laid out so as to not cross Jurisdictional boundary lines. Any necessary intergovernmental agreements must be executed prior to the issuance of a Development Permit. The developer and/or property owner has an affirmative duty at the time of application for land use approval or development permit application (if land use approval has already been granted or is not required) application to request with the affected governments that they enter into an intergovernmental agreement process. The County makes no guarantee to enter into any intergovernmental agreement. Sec. 32-109 Required improvements. (a) Minor subdivisions. By definition, a minor subdivision does not involve the construction of major public improvements, such as new streets or stormwater detention. However, the following improvements are required in order to adequately serve the lots and protect the safe operation of the existing road: (1) Right-of-way shall be delineated along the property's frontage from the centerline of the existing road equal to ½ of the minimum requirement for the classification of the road, as established in this Article Ordinance or otherwise specified by SCDOT. (2) The potential location of a driveway connection serving each lot and meeting the requirements of these development regulations shall be indicated on the final subdivision plat. (3) The stormwater carrying capacity of the road, whether in an existing ditch or gutter, shall not be compromised. If the stormwater characteristics of the existing road are Inadequate to accommodate the new lots, the County Engineering Department may require improvement of the roadway ditch as appropriate. (4) All lot corners shall be marked according to the Minimum Standards Manual for the Practice of Land Surveying in South Carolina. (b) Major subdivisions, multi-family and nonresidentialnonresidential developments. The following improvements shall be provided by the developer or at the developer's expense in every major subdivision or individual multi-family or nonresidentialnonresidential development in accordance with the requirements and standards contained in this ArticleOrdinance. (1) Survey monumentation in accordance with Sec. 32-111. Page 25 of 71 11 (2) Streets providing access to such a development and to all lots in such a subdivision, including the extension of streets required to provide access to adjoining properties, in accordance with Sec. 32-113. a. Streets contained wholly within such a subdivision shall be improved to the full standards contained in this ArticleOrdinance. b. Curb and gutter as required by Sec. 32-113(f). (3) Street name signs, stop bars, striping and traffic control signs as approved by the County shall be paid for by the developer and installed by the developer in accordance with Sec. 32-115. (4) Driveway access to each lot, and project access improvements (deceleration, turn lanes, etc.) as deemed necessary by the County Engineering Department under the provisions of Sec. 32-117 and Sec. 32-118. (5) Sidewalks, if required under Sec. 32-119. (6) Storm water drainage and detention facilities in accordance with Sec. 32-121. (7) Public or private water supply as required under Seс. 32-122. (8) Public or private sanitary waste disposal as required under Sec. 32-123. Sec. 32-110 Guarantee in lieu of completed improvements. (2/16/10) (a) Performance Surety. No final subdivision plat shall be approved by the County or accepted for recordation by the Register of Deeds, nor shall any lot within the development be sold or transferred until one of the following conditions has been met: (1) All public improvements shall have been properly installed and completed in accordance with all requirements and standards of this Development Ordinance and an as-built survey of the improvements shall have been approved by the County Engineering Department; or, (2) Pickens County has received a performance surety in the form of a letter of credit or surety bond issued by a financial institution with a presence in South Carolina or otherwise licensed to provide such services in South Carolina in the amount of 125% of the estimated cost of installation of the required improvements. (3) For residential developments, the improvements funded through the performance surety shall be limited to final pavement topping for streets, storm drainage infrastructure, curbing, grassing of street shoulders, landscaping, and street striping. For commercial or industrial developments with public infrastructure, it must cover the base, asphalt, grading, and storm drainage. (4) The developer shall submit actual cost estimates prepared by the developer's engineer, contractor, or subcontractors to the Planning Department. The Planning Department, along with the County Engineering Department, will perform a cost analysis for such infrastructure covered under any proposed surety. If such analysis generates a higher estimate than the estimates submitted by the developer, the higher of the two estimates will be used to determine the bond amount. (5) Completion of the improvements covered under the performance surety shall be accomplished within twelve (12) months of the approval of the final subdivision plat. (6) Upon completion of any deferred improvements: a. The as-built plans are to be updated by the developer and submitted to the County Engineering Department; b. A letter from the County Engineering Department authorizing the release of the surety shall be provided; c. A maintenance surety shall commence for the completed deferred improvements. (b) Performance Surety Default Page 26 of 71 12 If at any point in the schedule shown in Table 1.1, below, the County Engineering Department determines that the installation of infrastructure is not progressing as outlined in the schedule or that the developer is not working in good faith to bring the infrastructure to County standards, the County may declare the developer in default and can proceed to secure the proceeds of the surety in order to complete the installation of the infrastructure. Table 1.1 Using Asphalt Binder Course (as approved by the County Engineering Department) Not Using Binder Course Road base installed prior to the sale of any lots. Road base installed prior to the sale of any lots. Binder asphalt must be in place prior to the issuance of permits or the commencement of any construction. Surface course must be in place prior to the issuance of permits or the commencement of any construction. Final surface must be in place at 85% build out as determined by the County EngineerIt is strongly recommended that the final surface not be completed until at least 80% build out. Any and all deterioration to the road must be repaired to the satisfaction of the County Engineering Department within 30 days of notification by the County Engineer or within a time frame determined by the County Engineering Department if seasonal or weather conditions make the 30 day30-day time frame impractical. Any and all deterioration to the road must be repaired to the satisfaction of the County Engineering Department within 30 days of notification by the County Engineer or within a time frame determined by the County Engineering Department if seasonal or weather conditions make the 30- day time frame impractical. Sec. 32-111 Surveys Monuments. (a) As-built surveys. (1) Upon completion of the development activity as authorized by the development permit and prior to final development inspection of public and private improvements, the owner shall submit to the County Engineering Department a complete set of record drawings showing “as-built” conditions prepared by a licensed engineer or registered Tier B surveyor. These record drawings shall highlight any field changes to the location, vertical and horizontal alignment, and finished elevations of: a. Drainage system pipes and channels. b. Storm water detention facilities. c. Sanitary sewer system (if any). d. Water system. e. Streets, including street centerlines showing angles of deflection and standard curve data of intersection, radii, length of tangents and arcs, and degree of curvature with basis of curve data. (2) The submittal and composition of all as-built surveys must also meet the requirements of the Pickens County Storm Water Ordinance and accompanying Design Manual. Page 27 of 71 13 (a)(b) Survey monuments for Eexterior development boundaries. (1) An iron pipe or 1½-inch iron pin at least twenty-four (24) inches long shall be placed at all corners of the exterior boundaries of the subdivision or development project being developed. (2/16/10) (2) Existing permanent monuments that, in the professional opinion of a registered land surveyor, are of sufficiently durable construction shall be marked and maintained. (3) Other, more suitable permanent materials may be used as noted in the Standards of Practice Manual for Surveying in South Carolina, if such material provides for a permanent reference. (2/16/10) (b)(c) Survey monuments for Llot and street corners. (1) All other street or lot corners shall be marked with an iron pipe or 1½-inch iron pin at least twenty-four (24) inches long. (2/16/10) (2) All such monuments shall be properly set in the ground and shall be approved by a registered land surveyor prior to the time of final plat approval. (3) Other, more suitable permanent materials may be used as noted in the Standards of Practice Manual for Surveying in South Carolina, if such material provides for a permanent reference. (2/16/10) (c)(d) Floodplain Elevations. On developments containing floodplains, flood elevation references shall be set and noted on all plans and associated plats. Sec. 32-112 Easements. Easements shall be required in connection with subdivisions or developments for the following purposes, among others: (a) Utility easements. (1) Utility easements for private utilities shall be avoided except in cases where no other satisfactory arrangements can be provided for the installation of private utilities. (2) Whenever it is necessary or desirable to locate a public utility line outside of the street right-of-way, the line shall be located in an easement dedicated to the County (or other appropriate public entity) for such purpose. Easements for water and sanitary sewers shall be a minimum of 20 feet wide, andwide and may be required to be wider depending on the depth of cut to maintain a 1:1 open cut slope. When warranted, temporary construction easements with adequate widths shall be as required by the County. (3) Easements for sanitary sewers may be required by the County Engineering Department or public sewage provider for future extension of lines, whether or not the subdivision or development is currently proposed to be served by public sewer. (b) Pedestrian Easements. Pedestrian easements not less than ten (10) feet wide may be required where deemed essential to provide circulation, or access to schools, playgrounds, shopping centers, transportation, and other community facilities. (c) Drainage and access easements. (1) Drainage easements shall be cleared and opened for a closed stormwater or drainage system of adequate width and capacity at the time of development to control surface water run-off. Run-off slopes and side slopes shall be specified by the developer's engineer according to good engineering practices. Page 28 of 71 14 (2) A publicly dedicated drainage easement is to be provided along any manmade drainage channel or drainage pipe located outside a street right-of-way. All easements shall be no less than twenty (20) feet wide when used as an open ditch. Piped storm drainage shall have a minimum easement width of twenty (20) feet wide. (3) Drainage easements off the street right-of-way shall be clearly defined on the plat and deed of the individual property owner, and such property owner shall keep the easement free of obstructions and maintain that part of the easement within the property owner's boundary line so that free and maximum flow is maintained at all times. The property owner shall not alter any drainage improvements without the prior written approval from the County. (d) Conservations easements. Conservation easements, as may be required by this Development Ordinancethe UDSO shall be clearly defined on the plat and deed of the Individual property owner, and must conform to the requirements set out for such easements. (e) Overlapping easements. Easements for water, sanitary sewers and drainage purposes may be combined, but must be a minimum of thirty (30) feet if in combination. Any easement containing more than one pipe must provide at least 10 feet beyond the pipe, and the pipes must be at least ten (10) feet apart (measured on center). Wider easements shall be required when necessary to maintain a 1:1 open cut slope to each pipe. Sec. 32-113 Streets. (a) Access. (1) A publicly approved street meeting the requirements of this Article Ordinance shall serve every development and every lot within a subdivision. Private streets, when constructed and approved according to Section 32-114(b), are permitted. (2) Every development and every major subdivision shall have access to the public street system via a standard County road road, State road, or an approved private street. A building permit shall not be issued unless continuous road access between the property and the public street system is provided by a publicly dedicated street or an approved private street. (3) A building permit shall not be issued on any property that does not front on or have approved access to a publicly dedicated street or an approved private street, in accordance with the minimum lot frontage and access easement provisions of this Development Ordinance. (4) When land is subdivided into larger parcels than ordinary building lots, such parcels shall be arranged and designed so as to allow for the opening of future streets and to provide access to those areas not presently served by streets. (5) No subdivision or development shall be designed in a way that would completely eliminate street access to adjoining parcels of land. (6) Reserve strips which control access to streets, alleys and public grounds shall be prohibited unless their control is placed in the hands of the County under ownership, dedication, or easement conditions approved by the County Attorney and the County Engineering Department. (7) Subdivision streets that intersect a State or U.S. numbered highway, a County arterial or County collector road shall do so at intervals of not less than five hundred (500) feet, or as required by the South Carolina Department of Transportation, which everwhichever is greater. On all other roads, at least two hundred fifty (250) feet must separate street intersections on the same side of the road, measuredmeasured from centerline to centerline. Compliance with sight distance requirements of this Development Ordinance may require greater distances between street intersections. (b) Street classifications. Streets are classified according to the function that they serve, the type, speed, and volume of traffic they will carry and the required standards of design. The classifications of streets and roads are as follows: (1) Principal Arterials. Page 29 of 71 15 These roads, which include interstates and rural freeways: serve "substantial" statewide or interstate trips, as defined by high mileage or volume; connect most urban areas of twenty-five thousand (25,000) or more and virtually all urban areas of fifty thousand (50,000) or more; and provide an integrated network without stub connections except where geography dictates otherwise. (2) Minor Arterials. With the principal arterial system, these roads form a rural network that links other cities, larger towns, and other traffic generators, such as major resort areas, capable of attracting travel over long distances; links all developed areas of the state; and serve corridors with trip lengths and travel density greater than those predominantly served by rural collector or local systems. Minor arterials therefore constitute routes whose design should be expected to provide for relatively high overall travel speeds, with minimum interference to through- movement. (3) Major Collectors. These roads, with minor collectors, primarily serve the county rather than state traffic. Consequently, more moderate speeds are typical. They serve any county seat or larger town not on an arterial route, and other traffic generators of equivalent intra county importance, such as consolidated schools, shipping points, county parks, and important mining and agricultural areas; link the latter places with nearby larger towns or cities, or arterials and freeways; and serve the more important intra county travel corridors. (4) Minor Collectors. Serving county-wide traffic, these roads should evenly collect traffic from local roads and bring all developed areas within a reasonable distance of a collector road; provide service to the remaining smaller communities; and link the locally important traffic generators with the hinterland. (5) Local Roads. These roads serve primarily to provide access to adjacent land and serve low- mileage trips as compared to collectors or other higher systems. Local roads constitute the rural mileage not classified as part of the principle arterial, minor arterial, or collector systems. (c) Traffic Study Policy. (1) Overview. Under the current wave of growth Pickens County is experiencing, one of the greatest causes of concern is the traffic impact these various projects have and will continue to have on our community. There are frequent calls for a developer to do a "traffic study". In an effort to standardize when a study is required, what type or types of studies are required, the geographic range of the study and how far into the future the study should consider traffic patterns, the County is proposing a Traffic Study Policy which will define these terms and automatically trigger the appropriate traffic research on a case-by-case basis. (2) Purpose. The purpose of the Pickens County Traffic Study Policy is to standardize the requirements for various development-related traffic studies in Pickens County. By establishing a set of metrics tied to best practices and commonly accepted data, the decision to require or not require a traffic study shall be made based on empirical data. (3) Triggers for a traffic study being required. The following chart shows the type and scope of traffic studies required for various projects: Development trips/day generated Traffic Impact Analysis Traffic Circulation Analysis Traffic Volume Study Speed Study Origin & Destination Study Traffic Capacity Study Page 30 of 71 16 0-500 None1 None1 None1 None1 None1 None1 501-1000 Required None1 None1 None1 None1 Required 1001-1250 Required Required None1 None1 None1 Required Greater 1250 Required Required Required Required Required Required 1 Unless a development has a single entrance on an existing road that has previously had a traffic volume study that stated that the road was at capacity after previous development and would require structural changes to accommodate additional traffic flow. (4) Required Actions and Range of Study Based on Triggers: Development trips/day generated Peak Hour Calculation Un-signalized intersection range Signalized Intersection range Future Time Horizon Traffic Capacity Study 0-500 Yes 501-1000 Yes ¼ mile Nearest Commuter Corridor 10 years 1 mile 1001-1250 Yes ½ mile Nearest Commuter Corridor 15 years 1.5 miles Greater 1250 Yes 2 miles Nearest Commuter Corridor 20 years 2 miles (5) Trip Generation - Trip Generation calculations shall follow the most current Edition of the ITE (Institute of Transportation Engineers). At the time of adoption of this policy the most current edition is the Eleventh (11th). (6) Roadway/Paving Impact Analysis: Based on the outcome of the studies outlined above, the County Engineer shall review the data and make a recommendation regarding, but not limited to: • Roadway widening • Addition of travel lanes • Acceleration, deceleration, turning, or queuing lanes • The addition or removal of sidewalks • The addition or removal of bust stops • Curb/stormwater management work • Intersection signage including full signalization • Other signage as necessary • Parking study • Addition of bike lanes or multimodal pathways (7) Notes and Addendum. The County reserves the right to require traffic studies based on unique factors specific to a particular project or location. (8) Definitions. Average Daily Trips – Average Daily Trips (ADT) are the total number of trips, both in-bound and out-bound, within a 24 hour weekday period, generated by a particular use or development. Pass-By Trip – Trips generated by the proposed Project that would be attracted from traffic passing the proposed project site on an adjacent street that contains direct access to the Project. Peak Hour Trip – Peak Hour Trips are vehicle trips, both in-bound and out-bound, occurring during a one hour period either during the AM Peak (7AM to 9AM) or the PM Peak (4PM to 6PM), generated by a particular use or Project. Page 31 of 71 17 Project – A project subject to this policy encompasses all land use development projects affecting the built environment, including changes in occupancy or intensification of existing uses, over which the City has administrative or legislative authority, that require review and approval and issuance of a building permit, certificate of occupancy, or other land use approval by County staff, Commissions, or Council. Traffic Count – A traffic count is a count of traffic along a particular road, either done a digital counter (hose), electronically photography and OCR technology, or by human counters. Traffic Impact Analysis (TIA) – A TIA is provided to assess the near-term and long-term effects of specific development activity on the roadway system in a comprehensive manner. Development activity may include rezoning, platting, development plan approvals, Thoroughfare Plan amendments, and annexations. Traffic Circulation Analysis (TCA) – A TCA is provided to determine how a development's traffic relates to existing traffic on internal and adjacent roadways. A TCA can be required during the same stages of the development process as a TIA, or it can be required at the time of building permit, driveway permit, development plan, or certificate of occupancy. A TCA is smaller in scope and magnitude than a TIA and focuses primarily on localized impacts. Traffic Volume Study – Traffic volume studies are conducted to determine the number, movements, and classifications of roadway vehicles at a given location. The data helps to identify critical flow time periods, determining the influence of large vehicles or pedestrians on vehicular traffic flow. Speed Study – Spot speed studies are conducted to estimate the distribution of speeds of vehicle in the traffic stream at a particular position on highway. This is done by recording the speeds of vehicle at the specified location. Origin and Destination Study – An origin-destination study is used to determine travel patterns of traffic on an installation during a typical day. This is a study to determine and analyze trips. Trips are defined as one-way movement, from where a person starts (origin) to where the person is going (destination). Traffic Flow Characteristics – Traffic flow is the study of the movement of individual drivers and vehicles between two points and the interactions they make with one another. Traffic Capacity Study – A traffic capacity study is done to determine the maximum number of vehicles in a lane or a road that can pass a given point in unit time per hour per lane or roadway. The traffic capacity indicates a capability or maximum rate of flow with a certain level of service characteristics that can be carried by the road. The traffic capacity of a roadway depends upon a number of prevailing roadways and traffic conditions. Parking Study – A parking study is defined as the ratio of number of bays occupied in a time duration to the total spacе available. It gives an aggregate measure of how effectively the parking space is utilized. Roadway/Paving Impact Analysis – This is recommended by the County Engineer to determine the ability of a given section of roadway to handle any proposed increase of various types of traffic based upon a proposed development. (d) Relation to present and future street system. (1) The street pattern within a development or subdivision shall provide for the continuation or appropriate projection of the existing street pattern or anticipated development, if any, at the same or greater width, but in no case less than the required minimum width. Topography, natural features such as streams and tree growth shall be considered. (2) Existing streets that adjoin a development or subdivision boundary shall be deemed a part of the subdivision. The proposed street system within a subdivision shall have the right-of-way of existing streets extended no less than the required minimum width. Subdivisions that adjoin only one side of an existing street shall delineate one-half of the additional right-of-way 11 (e) needed to meet the minimum width requirement for the street. If any part of the subdivision includes both sides of an existing street, all of the required additional right-of-way shall be delineated. (3) All right-of-way required for off-site improvements shall be acquired by the developer at no expense to Pickens County. If the Developer is unable to acquire the right-of-way, the Pickens County attorney shall initiate acquisition proceedings, at the expense of the developer, after authorization by the Pickens County Council. Page 32 of 71 18 (4) Where, in the opinion of the County Engineering Department, it is necessary to provide for inter-parcel access to adjoining property, proposed streets shall be extended by delineation of right-of-way to the boundary of such property and existing streets through the development. (5) Subdivisions shall be laid out so as to discourage through traffic on local streets. However, the provision for the extension and continuation of arterial and collector streets into and from adjoining areas is required. (6) Where a subdivision abuts or contains an existing or proposed arterial street, the County Engineering Department shall require marginal access streets, single tier lots, or such other treatment as will provide protection for abutting properties, reduction in the number of intersections with the arterial street, and separation of local and through traffic. (7) Where no street exists or where the adjoining property is in alignment with a proposed street, a temporary turnaround shall be provided at the boundary of the property. (e) Design standards for streets. (1) Arterial Streets. All State or U.S. numbered highways shall meet all design requirements of and be approved by the South Carolina Department of Transportation. All County arterials that are not State or U.S. numbered highways shall meet all design requirements of this Development Ordinance. (2) Local and Collector Streets. All local and collector streets shall comply with the design and construction requirements of this Ordinance, except that all State or U.S. numbered highways and roadways shall meet all design requirements of and be approved by the South Carolina Department of Transportation. Traffic calming devices, when warranted (see Speed Bump Ordinance - Sec. 32-114), shall be installed in all residential and commercial developments. The County Engineering Department must approve the installation of any calming device. (3) Minimum width of right-of-way. Minimum width of right-of-way measured from lot line to lot line shall be as shown on Table 1.2. Additional right-of-way may be required to accommodate turn lanes, deceleration lanes, or other road improvements. Table 1.2: Minimum Right-of-Way Width Street Classification Width of Right-of-Way Arterial Street* Set by SCDOT Major Collector Street* Set by SCDOT Minor Collector Street Set by SCDOT Local Commercial or Industrial Street 66 feet Local Residential Street w/swale ditches 50 feet Local Residential Street w/curb & gutter 50 feet Alleys 24 feet (4)(3) Additional Right-of-Way. a.f. Subdivisions which include an existing street that does not conform to the minimum right-of-way requirements of this Ordinance shall provide additional width along one or both sides of such street or road so that the minimum Page 33 of 71 19 right-of-way required by this Article Ordinance is established if lots front on the existing street. Subdivisions abutting only one side of such a street or road shall provide a minimum of one-half of the right-of-way required by these regulations measured from the center of the existing right-of-way. b.g. When a future street or road, as proposed in the Comprehensive Plan or otherwise delineated by the County Council, adjoins or traverses the subdivision or development project, the future right-of-way shall be platted as part of the subdivision or development project. No development will be allowed within the platted future right-of-way except for drives and landscaping, and the platted future right-of-way is to be treated as a lot line for the provision of all setback lines as required by this Articlethe UDSO. c.h. When warranted by topography or other utility placement, on local residential streets with a fifty (50) foot right-of- way, additional property for a permanent utility maintenance easement shall be established adjacent to the right- of-way. (5)(4) Vertical alignment of streets. a. All streets shall have a minimum centerline grade of one halfone-half percent (0.5%) for curb & gutter sections, and one third percent 0.33% for ditch sections. Minimum grade on a cul-de-sac shall be one percent (1%). b. Minimum design speeds and maximum grades for proposed streets by street classification shallbe shall be as shown on Table 1.3. Design exceptions must be justified and approved by the County Engineering Department. c. Vertical curves intersecting tangents of less than 10% shall use a 'K" factor of16 for a crest vertical curve and a factor of 24 for a sag vertical curve. This shall be valid for a speed limit of twenty- five miles per hour or less. Center- line tangents intersecting greater than 10% shall be approved by the County Engineer on a case by caseCenterline tangents intersecting greater than 10% shall be approved by the County Engineering Department on a case-by- case basis, with sight distances being the major determining factor. Table 1.3: Street Grades and Design Speed Street Type Maximum Grade Maximum Design Speed Arterial Street Per SCDOT Per SCDOT Major Collector Street* Per SCDOT Per SCDOT Minor Collector Street Per SCDOT Per SCDOT Local Street 14% 25 mph Alleys Varies Varies (6)(5) Horizontal alignment of streets. a. See SCDOT Design Manual - Chapter 5 - for minimum radii on horizontal curves. b. Reverse curves in the street right-of-way should be avoided but may be approved by the County Eengineer'sing Department’s discretion (see Figure 1.2). Figure 1.2: Reverse Curves Page 34 of 71 20 c. Street jogs shall have a centerline offset of no less than as shown in the following table and figure: Table 1.4: Intersection Offset SPEED LIMIT ON MAIN THROUGH STREET OFFSET IN FEET 25 Miles Per Hour 125 Feet 35 Miles Per Hour 150 Feet 45 Miles Per Hour 175 Feet 55 Miles Per Hour 200 Feet Figure 1.3: Intersection Offsets d. Intersections. All streets shall intersect at no less than seventy-five (75) degrees, and as near a right angle as possible. The angle of intersection is to be measured at the intersection of the street center- linescenterlines. Such intersecting streets shall provide an uninterrupted line of sight from the center point of the inter- sectionintersection for not less than the minimum sight distance required in accordance with this Development Ordinance. e. Multiple intersections involving the junction of more than two streets shall be prohibited unless otherwise approved by the County Engineering Department. f. Curb lines at street intersections shall have a radius of curvature of not less than twenty-five (25) feet. Where the angle of street intersection is less than ninety (90) degrees, a longer radius may be required. g. Intersecting street right-of-way lines shall parallel the back of curb of the roadway, androadway and shall be mitered twenty (25) feet along both streets from the point of the right-of-way lines projected to their intersection. See Figure 1.4. Figure 1.4: Mitered Right-of-Way Page 35 of 71 21 (7)(6) Minimum sight distance. a. Sight distance requirements at intersections and driveways shall be as shown on in Table 1.5. In general, the sight distance requirement is based on a passenger car entering a two-lane highway and shall be adjusted if the development typically uses larger vehicles or is entering a highway with more than two lanes. See SCDOT ARMS manual for further guidance. Table 1.5: Minimum Sight Distance Intersection Sight Distance, Vehicles Approaching from the Left and for Vehicles Approaching from the Right on a Two-Lane Highway or Street Only Intersection Sight Distance (Feet) Design Speed (Vmajor) (mph) Passenger Car Single Unit Truck Tractor/Semitrailers 15 170 210 255 20 225 280 340 25 280 350 425 30 335 420 510 35 390 490 595 40 445 560 680 45 500 630 765 50 555 700 850 55 610 770 930 60 665 840 1015 Note 1: These ISD Values assume a minor road approach grade less than or equal to 3 percent. For grades greater than 3 percent, increase the ISD value by 10 percent. Note 2: These ISD Values follow those specifications set forth in the SCDOT ARMS Manual. Any updates to the Values in the ARMS Manual shall supersede the Values in Table 1.5 of this Ordinance. b. The design speed for sight distance requirements at entrance intersections shall be the existing posted speed limit. Page 36 of 71 22 c. Distances shall be measured from a point on the centerline of the entering road or driveway 15 feet back from the edge of the nearest trafficway in the abutting street, andstreet and extending in both directions along the abutting street. 1. Minimum sight distances are to be measured from the driver's eyes, which are assumed to be three and a half (3.5) feet in height above the pavement surface, to an object two (2) feet above the pavement in the center of every on- coming travel lane. 2. The sight distance shall be clear along its entire minimum length and un- impaired by intervening changes in street grade, horizontal alignmentunimpaired by intervening changes in street grade, horizontal alignment, or obstructions. Examples of obstructions are vegetation, ground cover, signs, existing topography, etc. Figure 1.5: Sight Distance (8)(7) Dead-end streets. a. Dead-end street length. 1. A dead-end street shall be no more than twenty-five hundred (2500) feet long unless necessitated by topographic or other conditions and approved by the County Engineering Department. 2. Where a dead-end street exceeds twenty-five hundred (2500) feet in length, the County Engineering Department shall require one or multiple interim turn around(s) to be provided. Figure 1.6: Interim Turnarounds Page 37 of 71 23 3. A dead-end street shall have a length of no less than one hundred twenty-five (125) feet. 4. The length of a dead-end street shall be the distance along the centerline of the dead-end street measured from the centerline of the intersecting street to the center point of the turnaround radius. 5. Other cul-de-sac designs may be considered by the County Engineering Department on a case by casecase- by-case basis. b. Turnaround dimensions. 1. Dead-end streets in residential subdivisions shall terminate in a circular turnaround having a minimum right- of-way of at least fifty (50) feet in radius, and a paved turnaround with a minimum outside radius of forty (40) feet. Figure 1.7: Cul-de-sac Dimensions Page 38 of 71 24 2. Cul-de-sacs in commercial and industrial subdivisions shall terminate in a circular turnaround having a minimum right-of-way of at least one hundred (100) feet in radius, and a paved turnaround with a minimum radius of eighty (80) feet. c. A dead-end street other than a cul-de-sac shall not be allowed except as a temporary stage of construction of a street that will be extended in a later stage of construction. A temporary dead-end street shall be provided with a temporary turn-around having a roadway radius of forty (40) feet if: 1. One or more lots front exclusively on the street; and, 2. Extension of the street is not under construction when the Final Plat is submitted for recording. 3. Temporary turnarounds shall consist of three (3) inches of graded aggregate base course. (9) Alleys and service drives. a. Alleys may be required at the rear of all lots used for multi-family, commercial or industrial developments. b. Alleys in residential subdivisions shall not be permitted, unless the alleys are intended to provide rear-access unless the alleys are intended to provide rear access to garages on each lot. Page 39 of 71 25 c. When allowed, dead-end alleys shall be provided with a turn-around having a radius of at least forty (40) feet, a "T- head" turn-around, or other solution acceptable to the County Engineering Department. (10) Half streets are prohibited. Half streets are prohibited. Whenever a street is planned adjacent to the proposed subdivision tract boundary, the entire street right-of-way shall be platted within the proposed subdivision. (11) Split Level Streets and One-way Streets. Streets which are constructed so as to have two trafficways, each at a different level within the same right-of-way, shall provide a paved traffic surface of at least sixteen (16) feet on each level and a slope between the two trafficways of not steeper than four to one. One-way streets and split streets will be allowed when: a. Topographic conditions are such that alternatives to the typical street construction would be more desirable. b. The shape and size of the parcel could be more efficiently developed. In either case, approval must be obtained from the Engineering Department for the specific design. (12) Intersection islands. Islands at intersections and the placement of signs within the right-of-way shall be subject to individual approval by the County Engineering Department. The following criteria shall be met in the construction plans of such intersections: a. Additional right-of-way must be provided to accommodate the divided intersection of island so as to meet all other requirements of this Oordinance. b. No type of sign or other construction will be located within ten (10) feet horizontally from the road right-of-way of the connecting road. In the event the connecting road has no right-of-way, an assumed right-of-way of twenty-five (25) feet from the centerline shall be applied. c. A concrete curb shall be constructed around the inside perimeter of the island. This curb shall be located four (4) feet horizontally from any sign or structure on all sides. d. The paved roadway on each side of the island shall have a usable paved width of not less than sixteen (16) feet. e. The centerline of Intersecting streets shall be a minimum of one hundred fifty (150) feet beyond the end of the entrance island. No taper shall be allowed across the width of intersecting roadways. f. No driveway curb cuts shall be allowed within five (5) feet of the end (rear) of the entrance island. g. There shall be one hundred (100) feet of tangent roadway separating the entrance from a curve in the roadway. h. The front of the island shall not encroach upon the intersecting right-of-way and shall not be more than ten (10) feet from the same right-of-way. i. Islands shall be properly underdrained. j. Islands shall be maintained by the Commercial/Industrial subdivision owner or the subdivision's Home OwnersHomeowners Association. k. Vegetation planted within islands shall not obscure motorists' view between the heights of 2' -7' above the pavement. Plantings shall be approved by the County. l. If the responsible parties for the maintenance of the islands are unresponsive to requests to remove dangerous trees and limbs from islands, the County reserves the right to remove these trees or portion of trees at the owner's expense if necessary. Page 40 of 71 26 Figure 1.8: Subsurface Drainage Figure 1.9: Entry Island Layout Figure 1.10: Island Details Page 41 of 71 27 Page 42 of 71 28 (13) Intersections and Driveway Grades. All streets and driveways shall provide a maximum grade of five (5) percent for a distance of twenty (20) feet from the edge of pavement at any intersection (see Figure 1.11). Figure 1.11: Intersection/Driveway Grades (Section Amended 4/1/2024) Page 43 of 71 29 (f) Street Construction and Improvements. Roadways shall be constructed and paved with asphalt/stone courses meeting the following standards: (1) All streets shall be graded to their full width by the developer so that pavement extensions or sidewalks, where required or if installed in the future, can be constructed on the same level plane. (2) Preparation of roadway: Before grading is started the entire area to be paved shall be first cleared of all stumps, roots, brush and other objectionable materials. In all areas to be graded or filled, the developer shall stockpile the topsoil later to be spread in all disturbed areas not paved. (3) Grading shall be done in accordance with the Site Clearing and Grading Section of the UDSO. (1)(4) Minimum width of pavement. a. The minimum pavement width, measured from edge of pavement to edge of pavement, shall be as required for the street type as shown in Table 1.6 as well as in the design details. (2)(5) Subgrade and Street base. a. After the earthwork has been completed, all storm drainage and other underground utilities have been installed under the roadbed, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades and cross section shown on the plans. b. No debris of any kind shall be buried at the site of any construction or development. c. Prior to placement of the street base, the subgrade shall be compacted to 95% density. d. When the street is to be used for construction traffic before the paving work is completed, a layer of No. 3 stone can be laid as a traffic surface if the developer so desires. This material shall not be used as part of the base material. It may be worked into the subgrade, or it shall be removed before the base course is set up for paving. a.e. Proof rolling of the subgrade and road base (stone) shallwill be witnessed and by County inspector or certified by Ddesign eEngineer, their representative, or geotechnical firm. Correct areas shown by the proof rolling operation to be unstable or non-uniform. After correction of these deficient areas, repeat the proof rolling operation. b.f. Wherever unsuitable material is found in the subgrade and/or stone base during the proof roll, the unsuitable material shall be removed to the depth directed by the Design Engineer, their representative, or geotechnical firm and replaced with graded aggregate stone or other suitable, thoroughly compacted material. After correction of these deficient areas, the proof roll operation shall be repeated. c.g. Graded aggregate base course, . The base course shall consist of mineral aggregate and may be a combination of natural deposit or a blend of the materials specified. All materials are subject to approval by the County Engineering Department. d.h. Street base material shall conform to the thickness as required for the street type in the Table 1.6 as well as in the design details. i. For streets without curbs, the base shall extend at least one half (0.5) foot beyond the edge of paymentpavement. j. Provisions shall be made to drain low points in road construction when the final paving surface is delayed. 1. Provide break in the berm section when the curbing has not been constructed. e. Use 6-inch pipe sections to provide drainage under curb to side slopes. (4) Abutting property shall be suitably sloped to the right-of-way line. Page 44 of 71 30 (3)(6) Pavement surface course. a. Prime. After the base has been placed, mixed, compacted, shaped, inspected and accepted, it shall be primed with suitable asphaltic materials as specified by the County Engineering Department. b. Roadway Intermediate Course. After the prime has been Inspected and accepted, the roadway or street shallbeinspected and accepted, the roadway or street shall be surfaced with Type B Intermediate Course as required for the street type on Table 1.6. c. Tack coat shall be applied on a prepared road surface according to the requirements of the County Engineering Department and the current standards of SCDOT. Table 1.6: Street Pavement Composition Street Classification Width of Pavement Base Course Intermediate Course Surface Course Residential Collector 24 ft. 6” GABC B 330 LBS/SY C 220 LBS/SY Local Commercial or Industrial Street 24 ft. 10” GABC B 440 LBS/SY C 220 LBS/SY Local Residential Street 24 ft. 6” GABC B 220 LBS/SY C 220 LBS/SY Alley 16 ft. 6” GABC B 220 LBS/SY C155 LBS/SY Roadway composition may be substituted by approved equivalent asphalt design structural number. d. Final Surface Course shall consist of Type C asphalt pavement as required for the street type on Table 1.6. e. If two-stage paving for residential streets is approved by the County Engineering Department, the developer shail shall place the binder course on the street but may delay final paving. Prior to the expiration of the performance period, the binder surface will be primed with suitable ásphalticasphaltic materials [0.25 gallon of R.C. 70 per square yard] the same day it is compacted, and cured for 7 days prior to paving. After the prime has been inspected and accepted, the roadway or street shall be surfaced. with a minimum of 2 inches of Type C asphalt pavement wearing surface. No surface treatment pavement 24 f. as a finished wear surface will be accepted. All asphalt pavements will shall be mixed in an asphalt plant meeting the latest requirements of the SCDOT. f. Rolling and finishing. 1. Rolling shall start at the edge and proceed toward the center, except on superelevated curves where rolling shall proceed from the lower to the upper side and shall continue until the aggregates are firmly keyed or set. On depressed widened areas not accessible for the operation of standard rollers, compaction shall be performed by other approved rollers or methods. 2. If initial compaction has been performed and the voids have not been filled, fine aggregate shall be placed upon the base in an amount only sufficient to fill the voids. The base course shall be broomed, wetted and rolled until the coarse aggregate is firmly set, bonded, and the base thoroughly compacted for the full width and depth. During all phases of the work, extreme care shall be taken to protect structures. 3. Finished roadbeds shall be crowned or elevated from the shoulder to centerline at a rate of 50:1 or 2% cross slope. Superelevated curves or tying to intersections may require steeper cross slopes. Compaction shall be to the satisfaction of the County Engineering Department. Figure 1.11A12: Roadway Typical Sections Page 45 of 71 31 (7) Testing standards for streets. When testing is required, it is the responsibility of the developer to ensure that all required tests are made and reported to the County Engineering Department. The cost of all testing and quality control shall be performed at the expense of the developer by qualified testing laboratories. Table 1.7: Testing Requirements Type of Test to be Performed Minimum Number of Tests Testing Standards Subgrade Compaction Each 500 linear feet of roadway 95% Max Density ASTM-1557 Field Tests ASTM D-1556 F-2922 and D-2167 Base Compaction Each 500 linear feet of roadway 100% Max Density ASTM-1557 Field Tests ASTM D-1556 F-2922 and D-2167 Asphalt Density Each 1,000 linear feet of roadway 92% Laboratory Density Asphalt Thickness Each 500 linear feet of roadway Deficient in thickness no more than ¼” (8) The Design Engineer, their representative, or geotechnical firm shall provide a letter of certification to the County Engineering Department to confirm that the road subgrade was inspected and approved for installation of stone base. A letter of Page 46 of 71 32 certification shall also be provided to confirm that the stone base was inspected and approved for paving. Both letters shall be provided to the Engineering Department prior to approval of a final subdivision plat. (4)(9) Curb and gutter. a. Curb and gutter are required along: 1. All new commercial and industrial streets. 2. All new residential subdivision streets except for those subdivisions meeting the following criteria: a) Fewer than twenty-four (24) lots will be located in the subdivision on the new streets; or b) The average size of all lots in the subdivision is greater than one (1) acre and the average lot width is greater than one hundred fifty (150) feet. 3. Existing County streets and roads that abut a subdivision where curb and gutter are required, or abut a multifamily or nonresidential development. 4. New construction on existing County streets and roads, including deceleration lanes and travel lane widenings. b. Local residential street curbs shall be, at a minimum, Portland cement concrete, 6-inch x 18-inch x 10-inch vertical or roll back type, with a minimum strength of 3,000 psi at twenty-eight (28) days. Figure 1.1B13: Curb & Gutter Typical Sections c. Curbs along collectors and local commercial or industrial street curbs shall be Portland cement concrete, 6-inch x 24- inch x 12-inch vertical type only, with a minimum strength of 3,000 psi at twenty-eight (28) days. Page 47 of 71 33 d. Curbing along streets shall meet the following standards: 1. Developer's engineer or surveyor shall set line and grade. 2. One-half inch expansion joints of pre-molded bitumastic expansion joint material shall be provided at all radius points and at intervals not to exceed 50 feet in the remainder of the curb and gutter. 3. The County Engineering Department shall individually approve special curbing design (center islands, etc.). 4. Curb and gutter shall be set true to line and grade and finished by skilled workers to the section shown on the plans. 5. Inferior workmanship or construction methods resulting in unsightly curb and gutter will be cause for rejection of the finished work. 6. All curbing shall be backfilled and grassed. 7. Adequate storm drainage structures shall be provided. The curb and gutter shall be constructed so as to present a smooth, even line both horizontally and vertically. There shall be no areas of ponding. 8. After installation, drainage under the curb to side slopes is required, using minimum 4-inch diameter pipe sections,Adequate storm drainage structures shall be provided. The curb and gutter shall be constructed so as to present a smooth, even line both horizontally and vertically. There shall be no areas of ponding. 9. A valley gutter may be used across a driveway at its intersection with a street. However, valley gutters shall not be allowed across streets at street intersections unless specifically approved by the County Engineering Department. (5)(10) Slopes and Shoulder Improvements. a. On streets with curb and gutter, the shoulders shall slope 30:1 or 3.33% toward the roadway for at least eight (8) feet from back of curb, and no steeper than 4:1 for the remainder of the right-of-way width. b. On streets with swale ditch drainage, the shoulders shall slope 12.5:1 or 8% away from the roadway for at least four (4) feet to the drainage channel. The maximum slope for the drainage channel shall be 4:1. (11) Protection of road shoulders. Page 48 of 71 34 a. Immediately after grading and filling and re-spreading of topsoil, all areas of disturbed soil shall be fertilized and seeded (or in steep areas sodded or otherwise appropriately treated) with suitable vegetative cover to retard erosion. b. When all construction is completed, all slopes and shoulders shall be cleared of all rubbish and shall have a stand of grass to prevent undue erosion, either by sprigging, sodding, or seeding. (6)(12) Guardrails. Guardrails shall be installed as per SCDOT specifications. Any slope steeper than 4:1 with an embankment greater than six (6) feet in height shall require a guardrail. Guardrail, where necessary near intersections and driveways, shall have adequate sight distance for motorists looking over the guardrail. Guardrail may be necessary to protect existing structures, designer should refer to AASHTO clear zones for guidance. (13) Foreign material on streets. a. The developer, builders, and/or homeowners shall be responsible for keeping dirt, mud, building materials, concrete, etc., off of the pavement and curbing of existing County or County roads during construction of buildings in all developments covered by these regulations. b. Before the streets are accepted by Pickens County, all litter and trash shall be removed from the dedicated rights- of-way and surrounding areas. (14) Following the completion of all street construction and submittal of the as-built surveys, the County Engineering Department shall conduct a final development inspection of the project. A punch list shall be compiled and provided to the Developer. The Developer shall be responsible for correcting any deficiencies identified in the final development inspection prior to approval of a final subdivision plat. (g) Substandard streets. In the event that a proposed commercial development or residential development of five (5) homes or more has access to a substandard road (i.e., a dirt or gravel road), the following project access improvements shall be required: (1) The substandard street shall be upgraded by the developer to a standard County road from the project entrance to the nearest standard paved road along the route of access. (2) The roadway section shall meet the requirements of a residential collector street. (3) The developer shall design the road and provide the labor, equipment and materials required for roadway improvements and necessary drainage improvements. (3) The right-of-way required for these off-site improvements shall be acquired by the developer at no expense to the County. If the developer cannot acquire adequate right-of-way, the County Attorney shall initiate acquisition proceedings at the expense of the developer after authorization by the County Council. (4) If Pickens County desires the roadway to be improved to a standard greater than that for a residential collector street, the County shall provide or pay the cost of the additional right-of-way, materials and labor. (h) Street Abandonment Procedures. This section establishes uniform procedures by which the County may consider the closure, abandonment, relinquishment, or disposal of a Public Road, Street, Right-of-Way or Surplus Property within the County Road System. The intent is to ensure that any such action complies with S.C. Code Ann. § 57-9-10 through § 57-9-40 and other applicable law, protects access for all affected property owners, and provides a transparent, consistent process for both County-initiated and citizen-initiated requests. Further, the intent is to establish a single comprehensive framework involving roadways and rights-of-way. For the purpose of this section, the following terms shall have the meanings assigned below. When not otherwise defined, terms shall have the meanings generally accepted within the road construction and public-works professions or as defined by state law. Definitions: Page 49 of 71 35 1. COUNTY ABANDONMENT OF RIGHT-OF-WAY (FORMAL LEGAL PROCESS- § 57-9-10 et seq.) A public road or public way: a. That is accepted by Pickens County Council and listed in the Official County Road Inventory; or b. That was accepted by deed, Dedicated Road Right-of-Way Petition, Affidavit for Dedication, or by prescription. This process follows South Carolina Code §§ 57-9-10 through 57-9-30, which authorize any interested person, the State, or any of its political subdivisions or agencies to petition the Court of Common Pleas to abandon or close a street, road, or highway, whether opened or not. 2. PUBLIC REQUEST TO ABANDON COUNTY RIGHT-OF-WAY A roadway or travel way being used or intended for use by the general public, whether paved or unpaved, existing or proposed, including alleys, cul-de-sacs, and stub-outs. This process applies when citizens or abutting owners request the County to abandon a County-maintained right-of-way. 3. PUBLIC REQUEST TO ABANDON COUNTY SURPLUS RIGHT-OF-WAY Applies to roadway property owned by the County that was never constructed or has ceased to be necessary for County Road purposes, as defined in Section 32-1 (Ord. No. 619, 10-3-2022). Such property may be disposed of through the Surplus Property Certification process and quit-claim deed procedures established therein. 4. DEDICATION The donation of land or creation of a roadway (or easement) for public use either expressly made or allowed by prescription. Procedural Framework by Type 1. COUNTY ABANDONMENT OF RIGHT-OF-WAY (FORMAL COUNTY ACTION) A. Initiation: May be initiated by any interested person, including the County, an abutting landowner, or another governmental entity. B. Notice: The petitioning party publishes notice once weekly for three consecutive weeks, mails certified notices to all abutting property owners (return receipt requested), and posts notice along the road subject to approval of the posting location by the maintaining authority. C. County Review: If the County is petitioning or supporting a petition, staff verifies ownership, maintenance status, connectivity, and emergency access. D. Council Consideration: County Council determines whether to endorse the petition and authorize the County Attorney to file or join in the petition. E. Court Filing: Petition is filed in the Court of Common Pleas. The Court determines whether abandonment serves the public interest and issues an order vesting title. F. Recording: The final order is recorded with the Register of Deeds, and the County road inventory and GIS are updated accordingly. 2. PUBLIC REQUEST TO ABANDON COUNTY RIGHT-OF-WAY A. Initiation: All abutting property owners may petition the Court of Common Pleas B. Notice: The petitioning party publishes notice once weekly for three consecutive weeks, mails certified notices to all abutting property owners (return receipt requested), and posts notice along the road subject to approval of the posting location by the maintaining authority. C. County reviews the petition and determines whether closure serves the public interest. D. County may file a statement disclaiming ownership or maintenance. E. If granted, ownership reverts to underlying owners; County updates GIS and road records. 3. PUBLIC REQUEST TO ABANDON COUNTY SURPLUS RIGHT-OF-WAY (Sec. 321 / Ord. 619) A. Written request submitted by adjacent landowner, staff, or other interested party. B. County Engineer completion of certification form that property is not part of the active road system and no deed conveys title. C. County Attorney prepares quit-claim deed to adjacent owners proportionally. D. County Administrator executes deed after reporting to Council. F. If a deed conveying title exists, a public hearing and three readings are required before execution. 4. DEDICATION A. Submission by developer or owner with plat, deed, or petition. B. Staff review for compliance with standards and title clarity. C. Council action by resolution or inclusion in road inventory. Page 50 of 71 36 D. Recording of acceptance; road becomes part of maintained County system. If standards unmet, Council may decline acceptance; road remains private or unmaintained public use. Sec. 32-114 Private residential access. Private residential access, if approved by the County, shall meet the following requirements and standards that apply to each, respective private access classification. (a) Shared Drive / Common Drive Hybrid. (1) No more than five (5) lots or dwellings may be served by a shared driveway. (2) When three (3) lots are served by a shared driveway, the shared driveway must be named; said name shall be approved by Pickens County E-911 staff. (3) The shared driveway shall be located within an easement of at least thirty (30) feet in width. (Shared driveway easements shall not be considered a part of a lot for the purpose of meeting the minimum requirements of this Development Standards OrdinanceUDSO.) (4) The maintenance of the shared driveway must be mutually agreed upon by the respective property owners and this maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually noted within the respective deeds. (5) The following plat certification shall be placed upon every plat for every lot utilizing a shared driveway: "The shared driveway and associated easement shown on this plat shall be a private access not owned, maintained, or supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All easements shown upon the plat shall not be considered for acceptance for maintenance by Pickens County.” (6) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the shared driveway. (7) The shared driveway cannot originate from another shared driveway or be connected at both ends to a public road. (8) The following minimum construction standards shall apply when a shared driveway serves more than 3 lots or dwellings. The standards must be certified as being met by a surveyor or engineer licensed in the State of South Carolina prior to piat plat approval. a. Have a fourteen (14) foot driving surface with four (4) inch thick compacted stone base and height clearance of thirteen and one-half (13.5) feet, and if a bridge is constructed as part of the private drive, a professional engineer shall certify the weight which the bridge willsupport will support and a sign shall be conspicuously displayed on each end of the bridge displaying the weight limits. b. Be provided with an unpaved cul-de-sac having a radius of thirty (30) feet or ending in a (t”T”)with two twentyfive twenty-five (25) foot extensions for vehicular turning movements. c. Meet the County's and SCDES Storm Water Management and Erosion and Sediment Control Regulations. d. Access onto a State road shall meet existing SC Department of Transportation requirements. Access onto a County road must be approved by the Pickens County Roads and Bridges Department through an encroachment permit. e. Construction and design exceptions may be granted upon the joint approval of the County Engineering Department, the Director of Emergency Services, and the Planning Department. (b) Private Roads. (1) The maximum number of lots which may be served by a private road shall be governed by Article 4 of the UDSO of this ordinance. Page 51 of 71 37 (2)(1) The private road shall be located within a designated right-of-way of at least fifty (50) feet in width, and that right-of-way shall be owned and controlled by a homeowner's association or other entity responsible for the road's maintenance. (3)(2) All lots must meet minimum Development OrdinanceUDSO requirements for minimum frontage onto the private road. (4)(3) Minimum lot size shall be governed by Article 4 of the UDSO. (5)(4) The private road cannot originate from a shared driveway or from a common drive. The private road may originate and connect to another private road provided that road meets the minimum requirements listed in this section. (6)(5) The maintenance of the private road must be mutually agreed upon by the respective. property owners and this maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually noted within the respective deeds. (7)(6) The following plat certification shall be placed upon every plat for every lot utilizing a private road: "The private road and associated right-of-way shown on this plat shall be a private access not owned, maintained, or supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All easements and rights-of-way shown upon the plat shall not be accepted for maintenance by Pickens County at any time in the future unless constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as amended." (8)(7) All subdivisions utilizing private roads for access must be approved by both the Planning Commission and Engineering Departments in accordance with the procedures listed in Article 12 of the UDSO. (9) Only those lots approved by the Planning Commission and platted with the private road may utilize said road. (10)(8) The private road must be named; said name shall be approved by Pickens County E-911 staff. (11)(9) Construction standards. The private road shall be constructed in accordance with the respective requirements for a public, local residential street. Sec. 32-115 Street signs, traffic signs and striping. (a) Street name signs. (1) Street name signs of a type approved by the County are to be placed at all intersections. (2) Street markers shall be installed by the Developer at the Developer's expense (or a homeowners association in the event an alternate signpost is chosen at a later date). (3) If nonstandard street signs are installed by the Developer/HOA, the Developer/HOA shall maintain the street signs. (b) Traffic Signs. (1) Traffic control signs shall conform to the U.S. Manual on Uniform Traffic Control Devices, latest edition. (2) The Developer shall install theseAll street signs, traffic control signs, and devices such as striping and signalization, shall be installed by the Developer. (3) Stop signs shall be located from the sign's edge 6 feet off the back of curb or edge of pavement at the beginning of the intersection radius. The sign shall be located on the right side of the intersection. The bottom of the sign shall be at least 7 feet above the edge of pavement or back-of-curb. This standard applies to typical residential interior street intersections. (4) All other intersections shall have stop signs located according to the Manual on Uniform Traffic Control Devices. The Developer shall install these signs. Page 52 of 71 38 (5) Stop signs shall be sized so that their overall dimensions are 30 inches by 30 inches. (6) All other signs shall be sized according to the Manual on Uniform Traffic Control Devices. (c) Striping Requirements. (1) All newly constructed streets having four (4) or more lanes (including auxillary lanes) and existing streets being widen edauxiliary lanes) and existing streets being widened with one or more additional lanes shall be striped by the developer prior to approval and acceptance of the development by Pickens County. (2) Striping shall be accomplished with paint meeting SCDOT standards conforming to the Manual on Uniform Traffic Control Devices. (3) Final striping shall be thermoplastic. (4) Yellow double center line markings should be placed on collector streets that have a traveled way of 18 feet or more in width and an ADT of 3,000 vehicles per day or greater. White edge line markings should be placed on collector streets with a traveled way of 20 feet or more in width and an ADT of 3,000 vehicles per day or greater. Yellow center line and white edge markings in residential subdivisions are not necessary. Engineering judgement should be used if ADTs are not available. Sec. 32-116 Street Lights The installation of all street lighting fixtures within County right-of-way must be approved by the County Engineering Department prior to such installation. All street lighting fixtures, including those within County right-of-way, shall be maintained by the HOA. Sec. 32-117 Driveway and Development entrances. All proposed subdivisions, subdivision lots and other land developments shall be provided with driveways or development entrances meeting the following requirements: (a) Encroachment Permit. An encroachment permit will be necessary for any land disturbance (i.e. new roadway, driveway, or drainage structure, etc.) installed within the County right of wayright-of-way. (1) Link to theThe Encroachment Permit application can be found on the Pickens County Engineering or Roads & Bridges websites– https://cms5.revize.com/revize/pickenscountysc/Encroachment%20Application%209.2026.pdf?t=202609101455410 (2) See Table 1.5 for sight distance requirements. (3) The centerline of the proposed driveway or roadway must be staked by the applicant and verified for adequate sight distance by the County representativeEngineering Department. Final clearing of vegetation and trees will be necessary prior to field verification. (b) Driveway access to a State road. Access onto a State road shall meet existing SC Department of Transportation requirements. A copy of the SC Department of Transportation permit shall be submitted to the County Engineering Department before the plans can be approved. (c) Driveway access to major County roads. (1) Residential lots in any major subdivision shall have no direct driveway access to a County major collector or arterial road unless approved by the County Engineering Department, or to a State or U.S. numbered highway unless approved by the SCDOT, and incorporated into the construction drawings for the project prior to issuance of a development permit by Pickens County. Page 53 of 71 39 (2) Reverse frontage lots may be utilized but are not required in major residential subdivisions where direct access to a County road, or to a State or U.S. numbered highway, is not allowed. (d) Driveway standards; in general. Each driveway shall be constructed in a manner that will not damage the adjacent roadway or hinder use of the adjacent roadway. (1) Driveways shall not intersect adjacent roads at an interior angle less than 60 degrees; (2) All waters from driveways must enter onto the shoulders of adjacent roads and into the ditch or gutter. No water shall enter onto the adjacent road surface or pavement; (3) Any driveway entering on a roadway or street shall provide a maximum grade of five (5) percent for a distance of twenty (20) feet from the edge of pavement at any intersection. (4) At the ditchline, the driveway must be lower in elevation than the adjacent roadbed; (5) As far as practical, all driveways must be located and constructed so as to maximize sight distance by those traversing the driveway or the adjacent road; (6) In and around the first fifty (50) feet of all driveway culverts, the slope of the land shall be at a grade of no more than 3:1 so as to enable to the County to better maintain the culvert area; and (7) All driveway culvert pipes shall comply with the materials and installation requirements of this ArticleOrdinance. (8) On subdivided lots which access an existing County road, the driveway shall be placed as far as possible from existing road iIntersections to maximize sight distance. (9) Driveway spacing of commercial and multi-family residential developments from adjacent driveways or intersections shall meet the minimum distances shown below. Table 1.78: Driveway Spacing Posted Speed Limit (mph) Minimum Driveway Spacing (ft) on roadways with AADT ≥ 2000 or Driveways Generating more than 50 Peak Hour Trips Minimum Driveway Spacing (ft) on roadways with AADT < 2000 30 160 75 35 220 125 40 275 175 45 325 225 ≥ 50 400 275 (10) Exceptions to the minimum driveway spacing include the following: a. The placement of residential (low volume) driveways. These driveways shall be placed in a reasonable location to avoid interference with adjacent driveways and shall be agreed upon with the County Engineering Department. b. An existing driveway is being upgraded/modified. This only applies if the proposed land use for which the driveway is accessing is the same as the existing land use. (e) Residential subdivision entrances. Page 54 of 71 40 (1) Access improvements such as deceleration lanes, dedicated left-turning lanes, center turn lanes, merge lanes, signalization, etc., required as deemed necessary for safe traffic operations by the County Engineering Department shall be installed at all entrance roads into a residential major subdivision. See Sec. 32-118, below. (2) A single entrance road to a subdivision shall serve no more than ninety-nine (99) lots. Where the property configuration prohibits or makes impractical the installation of more than one entrance, the County Engineering Department may waive this requirement following sound engineering practice. When more than one entrance is required, the first additional entrance shall be provided to serve up to an additional one hundred fifty (150) lots, and each additional entrance thereafter shall be provided for each additional two-hundred fifty (250) lots. (3) Residential major subdivisions with fewer than twenty-four (24) lots whose entrance is on an existing collector or arterial road, and any major residential subdivision whose entrance is on an existing minor collector road, shall install offset radii and fifty (50) foot tapers. (f) Commercial/Industrial subdivision entrances. Access improvements such as deceleration lanes, dedicated left-turning lanes, center turn lanes, merge lanes, signalization, etc., required as deemed necessary for safe traffic operations by the County Engineering Department shall be installed at all entrance roads into a commercial/Industrial subdivision. See Sec. 32-118, below. (g) Driveways for multi-family and non-residential developments. (1) Access improvements such as deceleration lanes, dedicated left-turning lanes, center turn lanes, merge lanes, signalization, etc., required as deemed necessary for safe traffic operations by the County Engineering Department shall be installed at all entrance roads into a multi-family or non-residential development. (2) If a driveway entrance on a major collector or arterial street is less than two hundred (200) feet from an intersection, a continuous travel lane shall be constructed from the intersecting street to the driveway, and an acceleration lane shall be constructed beyond the driveway. Acceleration lanes shall extend for one hundred fifty (150) feet, with an additional fifty (50) foot taper length, and have a pavement width of twelve (12) feet (exclusive of curb and gutter). Additional right-of-way to accommodate the acceleration lane and a ten (10) foot shoulder shall be dedicated by the developer to Pickens County. (3) Commercial businesses on corner lots that have frontage on a local or minor collector side street shall install an additional lane out to the intersection if driveway access from said side street is provided. (h) Maintenance of sight distances. The developer shall be required to upgrade the existing County road to meet the sight distance requirements of this ArticleOrdinance. In cases involving rock cuts, deep fills or cuts, proximity to floodplain, etc., the requirements of pavement widening for full deceleration lanes may be modified or waived by the County Engineering Department following accepted engineering practice. Sec. 32-118 Deceleration lanes and turn lanes. (a) Deceleration lanes; where required. A deceleration lane shall be required at each entrance to a residential subdivision of 24 lots or more, commercial or industrial subdivision, multifamily development or nonresidential development at its point of access with a collector or arterial street. (b) Median breaks. If the street has an existing or proposed median, and the developer desires to construct a median break to serve the development, a left turn lane leading to the median break shall be provided by the developer meeting the design standards of Pickens County. Page 55 of 71 41 (c) Deceleration and turn lane constructions standards. (1) Generally, deceleration lanes and turn lanes shall be a minimum length of one hundred fifty (150) feet, with an addition al fifty (50) foot taper lengtih, and a pavement width of twelve (12) feet (exclusive of curb and gutter). Additional right-of-way to accommodate the deceleration lane or turn lane and a ten (10) foot shoulder shall be dedicated by the developer to Pickens County. Deceleration lanes and tapers may be required to be of greater length, based on the design speed of the road. (2) Curb and gutter along all deceleration lanes and tapers are required, and shall be constructed in accordance with Sec. 32- 113 (f)(4). (3) Associated drainage improvements as deemed necessary by the construction of the deceleration or turn lane shall also be required. (4) Other project access Improvements may be required by the County Engineering Department in addition to or in lieu of a required deceleration lane in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public, based on a traffic study prepared by a professional engineer. (5) The developer will pay the cost of any catch basins that must be constructed along an existing County road as a result of the deceleration lane. (6) Utilities and drain pipes shall be relocated at the developer'’s expense outside of the deceleration lane. Waterlines can remain beneath the additional lanes. Sec. 32-119 Sidewalks. (a) Sidewalks; where required. (1) The Planning CommissionDepartment, in consultation with the School District of Pickens County, shall determine the need for sidewalks within subdivisions within one (1) mile of a school or for any subdivision with 10 or more homes on lots one (1) acre or less. If the determination is that a sidewalk is necessary, the subdivision developer shall be required to construct a concrete sidewalk on both sides of all residential collector and residential local streets within the proposed development. (2) The Planning CommissionDepartment, in consultation with any adjacent municipality when a proposed development is located adjacent to that municipality'’s sidewalk network, shall determine the need for sidewalks within that development. If the determination is that a sidewalk is necessary for circulation and access to public facilities or shopping opportunities, the subdivision developer shall be required to construct a concrete sidewalk on both sides of all residential collector and residential local streets within the proposed development. (3) Sidewalks are not required along any street that does not have curb and gutter. (4) Sidewalks shall be maintained by the Developer/HOA. (b) Sidewalks;, where located. (1) Sidewalks shall be located a minimum of two (2) feet from the back of curb, and a minimum of one (1) foot from the property line to prevent interference of encroachment by fencing, walls, hedges or other planting or structures placed on the property line at a later date. Page 56 of 71 42 (2) Sidewalks, when required, shall be located on one side of all residential collector and residential local streets within the proposed development. (c) Sidewalks; construction. (1) Sidewalks must comply with all requirements of the federal Americans with Disabilities Act. (2) Concrete sidewalks shall be a minimum of five four (54) feet wide and four (4) inches thick. (3) Concrete shall be 3,000 psi at twenty-eight (28) days'’ strength. (4) Sidewalks shall be backfilled and landscaped. (d) Crosswalks. Crosswalks shall be installed at stop-controlled intersections having sidewalks. Thermoplastic striping eight inches wide shall designate the six feet wide crosswalk. The stop bar shall be placed a minimum of 4'’ from the crosswalk. Figure 1.1214: Crosswalks Page 57 of 71 43 Sec. 32-120 Location of utilities and curb cuts. All utility work, encroachments, pavement cuts and associated road or lane closures must be reviewed, approved and permitted by the County Engineering Department. (a) Location of utilities in streets. (1) Above-ground utilities. Street light poles, junction boxes, transformers and other public or private utility structures placed above ground within a street right-of-way must be at least eight (8) feet back from the back of the street curb (or edge of pavement) and one (1) foot back from the edge of any sidewalk, whichever is farthermost from the roadway. (2) Underground Utilities. a. After grading is completed and approved, the curb lines shall be staked by the developer’s Registered Land Surveyor. Before any base is applied, all of the underground utilities—water mains, sewer mains, gas mains, or any other underground utilities, and all service connections related thereto, that will be located under the street base shall be installed completely and provided throughout the length of the street and across the flat section. Service connections for sanitary sewer (if required) and water shall be extended to the right-of-way lines. a.c. Utilities placed underground shall be placed within the right-of-way as shown on the Standard Details. Commented [RR2]: Below lettering and formatting to be corrected in Final Draft. Page 58 of 71 44 b.d. The right-of-way is to be cleared and rough graded the full width prior to any utility installation. c.e. Cable and pipe shall be three (3) footfeet below finished grade minimum. d.f. Any disturbance or construction in the completed (seeded and/or sodded) right-of-way by a public utility such as power, water, sewer, gas, phone and cable must be repaired and/or replaced with the specified materials as called for in the initial improvements. e.g. All utilities beneath pavement shall be installed and the ditch backfilled and thoroughly compacted before any pavement or base is installed, or the pipes shall be bored if installed after street construction. If pavement cuts are necessary to repair utilities, asphalt repairs shall match the existing roadway pavement section. f.h. All utility manholes and valve boxes shall be brought to the finished grade within the roadway section. g.i. All private utilities that will cross under pavement shall be installed completely throughout the subdivision prior to any roadway base being applied. Approved utility sleeves shall be installed if utility installations are not completed prior to roadway base construction. h.j. All utilities shall parallel the roadway and be placed in the shoulders, excluding where crossings are necessary. Utilities crossing under the roadway, excluding lateral, shall be perpendicular to the roadway and sleeved. k. Utility plans shall be approved by the County Engineering Department. i. All utility locations shall correspond to the typical cross-sectional layout included in the Pickens County Standard Design Specifications l. No private improvements, such as private lawn sprinkler systems, yard lighting, and the like, shall be installed within a public right-of-way except by authorization of the County Engineering Department. Such authorization, if issued, shall require the owner to assume all repair costs of the owner’s facilities should they become damaged. (3) Underground utility location within an open ditch. a. Maximum drainage swale slopes (front and back) are 5:1 and a minimum of 4:1 with the invert of the swale no less than twenty-four (24) inches from the finished elevation of the street. b. Utilities shall have a minimum 24"”cover from the invert of the ditch and the bottom of culverts. (4) Underground utility location with curb and gutter. Cross drains are to be carried to the toe of construction slope. (b) Utility installation within rights-of-way of existing streets. (1) The County’s policy is no existing County roads can be open cut unless unusual circumstances warrant it. Storm sewers thirty-six (36) inches or smaller shall be bored. Contact the County Engineering Department to discuss further if the open cut Commented [RR3]: Numbering to be corrected in Final Draft. Page 59 of 71 45 of any existing County road is necessary. If the County allows open cutting, all trenches under existing paving shall be backfilled and compacted in 6-inch lifts. a. The paving cut shall be widened to a minimum of 12 inches beyond the edges of the trench and excavated to allow for the 6 inches of 3000 psi concrete and 2 inches of asphaltic concrete to be placed. b. The edges of the paving cut shall be smooth. c. A final wearing surface of 2 inches of Type “E” asphaltic concrete shall be poured and rolled after the concrete is cured. (2) An encroachment permit is required from the County Engineering Department for installation within the rights-of-way of County roads and SCDOT for installation within the rights-of-way of State roads. For County roads, this is also required for bores. Contact SCDOT for encroachment requirements on State roads. (3) Replacement of pavement. a. The General Contractor shall fully restore and replace all pavement, curbs, gutters, sidewalks and other surface structures removed or disturbed, to a condition that is as near original condition as possible. b. Pavement cuts. 1. All pavement cuts on County streets or roads shall be made by sawing prior to excavation to eliminate uneven and ragged edges. 2. All road cuts shall have a six (6) inch thick concrete cap (3,000 psi in 28 days) which shall extend not less than 12 inches beyond the edges of the back-filled ditch. 3. Final asphalt patches shall match the existing pavement type but be no less than 1½ inches thick. Special care shall be exercised to match existing slopes and grades for a smooth transition. c. The streets in which the utility line is installed shall receive a full-width asphalt repaving in accordance with the specifications of this Ordinance. (4) All existing utilities shall be located and protected prior to installation of underground utilities. It is the responsibility of the contractor to locate all underground utilities and to protect the same. Utility lines or services damaged by the contractor shall be repaired by the contractor at the contractor’s own expense. (c) All trenches shall be backfilled and compacted the same day the trench is opened. (1) Trenches under the paving shall be returned to 95% compaction. The backfill in all such ditches will be thoroughly compacted; the subgrade shall be brought to the lines, grades, and typical roadway section shown on the plans. (2) Compaction tests at a rate of one per 150 feet of trench shall be provided to verify compaction. (3) Trenches elsewhere shall be returned to 90% compaction. Sec. 32-121 Storm drainage. Page 60 of 71 46 Stormwater facilities shall be governed by the Pickens County Stormwater Ordinance and accompanying Stormwater Design Manual. Where discrepancies exist between this development Oordinance and the adopted Pickens County Stormwater Ordinance and accompanying Stormwater Design Manual, the Stormwater Ordinance shall control. (a) Applicability and exemptions. (1)(4) An adequate drainage system, including necessary ditches, pipes, culverts, drains, inlets, bridges, etc., shall be provided for the proper drainage of all surface water. (2)(5) All persons proposing development or construction in the County shall prepare a stormwater management plan. No final subdivision plat shall be approved and no development or building permit shall be issued until and unless the stormwater management plan has been reviewed and approved by the County Stormwater Manager and the County Engineering Department as guided by the Pickens County Storm WaterStormwater Ordinance and accompanying StormwaterStorm Water Manual. (3)(6) Exemptions from Storm Drainage Requirements. Consultation should be made with the Pickens County Stormwater Manager to determine any applicable exemptions from these requirements. (4)(7) Any revisions to the stormwater management plan shall be submitted to the County Engineering Department for review and approval. (b) Standards to be used in designing the drainage system: (1) Storm detention facilities: All stormwater detention facilities shall be provided for and designed according to the adopted Stormwater Ordinance and accompanying Stormwater Design Manual. (2) Location of stormwater detention facilities. a. In residential subdivisions, the detention facility must be located on a separate lot and owned by a homeowners'homeowners’ association, which shall be responsible for its maintenance and continuing operation. The lot need not meet minimum lot size requirements for the subdivision. b. In nonresidential subdivisions, the detention facility may be located on a separate lot and owned by a property owners'owners’ association, which shall be responsible for its maintenance and continuing operation; or located on each lot within the subdivision and constructed when the lot is developed. c. In multl-familymulti-family and nonresidential development projects, separate detention facilities shall be provided for each development. The owner of the property shall be responsible for maintenance and continuing operation of the facility. d. Stormwater detention facilities serving two or more developments may be approved by the County, provided that private ownership of the facllities facilities and provisions for their perpetual maintenance and continuing operation are clearly established in a manner acceptable to the County Attorney. e. Where fences are required to be provided by the County Engineering Department, they shall be constructed between 3.5 and 6 feet high. 1. Commercial gauge chain link fence shall be screened with acceptable hedge material or a climbing vine. Page 61 of 71 47 2. If a wood fence is desired, it shall be placed on the lots of the individual property owners and be noted as their maintenance responsibility (i.e., shown on the plats and deeds at dedication). (3) Storm Drains. a. Crossline pipes shall be designed to carry a 25 year -24-hour25-year, 24-hour storm and shall be RCP Class III concrete. The design shall be determined using runoff data sources and standard methods approved by the County Engineering Department. However, no culvert less than eighteen (18) inches in diameter will be acceptable. b. Concrete culverts must conform to South Carolina Highway Department requirements. Hancor double walldouble-wall plastic pipe or an approved equivalent shall be accepted where sufficient fill over the pipe is provided. No metal pipes shall be accepted. c. All parallel culverts and driveway culverts shall be designed to carry a 10 year -– 24 hour10-year, 24-hour storm event. Driveway culverts shall be a minimum of fifteen (15) inches in diameter. d. Where possible, allpipe all pipe shall be laid in a trench. Trenches shall be excavated to the required grade and to a width sufficient to allow for proper installation and back fill around the pipe,. The backfill method used shall be different for rigid (concrete) and for flexible (corrugated) pipe and shall be as specified by the manufacturer. All culverts shall have a minimum of ten (10) inches fill above the top of the culvert, excluding pavement and/or base of pavement. Flexible pipe shall have a minimum of two feet of fill over the pipe. All fill shall be compacted to 98% of standard proctor test in the top foot of fill. e. The jointing of sections of culvert shall be done in a workmanlike manner in accordance with the standard practice recommended by the manufacturer of the culvert being used. f. The ends of all pipe culverts shall be properly protected to prevent piping, erosion, and scour. Placement of filter fabric and rip-rap shall be considered minimum treatment. End treatments shall be approved by the County Engineering Department and shown on the plans. g. Alil crossline drainage culverts shall be located in natural drainage areas or depressions. All crossline culverts will terminate at a dedicated drainage easement, . Drainage easements shall be a minimum of twenty (20) feet wide. h. All existing culverts within the County right-of-way impacted by proposed developments shall be upgraded as necessary to accommodate proposed flows. i. Junction boxes of an approved type will be constructed at all points where the line of pipe changes course or direction ten (10) degrees or more and at proper intervals along the line of pipe. j. A means of access to inlet and outlet points of drainage structures and appurtenances must be provided and shown on the plans. Pickens C k. Exits for surface water in sideline ditches or curbs shall be provided in accordance with the following schedule: Page 62 of 71 48 Table 1.9: Surface Water Exit Intervals ROAD GRADE EXIT INTERVAL 2% 800 Feet 4% 700 Feet 6% 600 Feet 8% 500 Feet 10% 400 Feet 12% 300 Feet More than 12% 200 Feet l. All storm water drainage features such as swales, ditches and pipes shall be constructed to an approved discharge point or to the property line of the development. All storm water features shall be in place and properly stabilized to prevent erosion of the constructed swale or ditch. Velocities within grass stabilized ditches or swales shall be held to non-erosive flow rates, Storm watergrass-stabilized ditches or swales shall be held to non-erosive flow rates. Stormwater flow rate calculations shall be based upon proposed ground cover conditions and the Manning Equation and submitted to the County Engineering Department before approval of the construction plans is given. (4) Bridges In the event that it becomes necessary to install a bridge rather than a pipe culvert, then such bridge and installation shall conform to current South Carolina Department of Transportation requirements, . Bridge piling shall be driven to SC DOT load standards for loading. Certification of pile load shall be by a registered Professional Engineer. Bridges shall provide 2 feet of freeboard to the low chord, above the 25-year storm event. Detailed bridge designs and calculations must be submitted to the County Engineering Department for separate approval. The necessity for a bridge and its design criteria shall be determined on an individual basis. Sec. 32-122 Public water system. (1) If a public water system is to be installed, the improvements are to be reviewed, approved and inspected by the providing jurisdiction. Installation shall be coordinated with the construction of streets under the County’s direction, as applicable. (1)(2) Public water service shall be provided to every lot in every subdivision and to every development for both domestic use and fire protection if public water is available. Water mains shall be connected to the existing public water system and extended past each lot. All water system improvements shall meet the standards for public water service of the providing jurisdiction. For the purposes of this section, available shall mean an adequate water supply to serve both domestic use and fire protection (flows of 550 gallons per minute minimum) located adjacent to or within close proximity to the property being developed. (2)(3) Mains shall be at least 6 inches in diameter. (3)(4) If a public water system is not available nor under bid or contract to be available, the sub divider shall provide a water supply using a community water system or individual wells in conformity with the regulations of DHEC, these development regulations, and all other applicable laws and regulations. If a community water system is created, it must be designed to provide a minimum fire flow of 550 gallons per minute. Sec. 32-123 Public sewerage system. (1) If a public sanitary sewerage system is to be installed, the improvements are to be reviewed, approved and inspected by the providing jurisdiction. Installation shall be coordinated with the construction of streets under the County’s direction, as applicable. Page 63 of 71 49 (1)(2) Every lot in every subdivision and every development shall be connected to septic tanks or other on-site disposal systems in accordance with the regulations of DHEC, these development regulations and all other applicable laws and regulations. (2)(3) If a community septic system is created, it must be approved by the Pickens County Public Service Commission (or other providing Jurisdiction when applicable). (3)(4) If a subdivision or other development is requesting from Pickens County the ability to tie onto a public sewage conveyance and treatment system, then all system improvements and construction shall meet the standards for public sewer service of the providing jurisdiction. Page 64 of 71 50 Passed and approved, this _____ day of _______________________, 2026 COUNTY COUNCIL OF PICKENS COUNTY SOUTH CAROLINA ________________________________________ Alex Saitta, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: _____________________________________________________ Jessica Varney, Clerk of County Council Pickens County, South Carolina Page 65 of 71 AGENDA ITEM: 2d PICKENS COUNTY COUNCIL MEETING SUPPORTING DOCUMENTATION Meeting Date: November 30, 2026 Agenda Item: 2d Department: Planning/Engineering Prepared By: Allison Fowler, Assistant Administrator Subject: Public Hearing of Ordinance No. 695 to Amend the Unified Development Standards Ordinance to Clarify Language Regarding the Road Ordinance, Open Space Subdivisions and Other Matters Related Thereto Summary: Public Hearing to Clarify/Amend references to the now removed Article 10 to instead reference the Road Ordinance (No. 672), clarify language regarding open space and conservation easements related to Open Space Subdivisions in Article 5 Documents Included: N/A Action Requested: N/A Staff Recommendation: N/A Previous Council Action (if any): Additional Notes: • Recommendations from staff through the UDSO Ad Hoc Committee • Planning Commission Public recommendation from November 9th hearing Page 66 of 71 AGENDA ITEM: 3b PICKENS COUNTY COUNCIL MEETING SUPPORTING DOCUMENTATION Meeting Date: November 30, 2026 Agenda Item: 3b Department: Building Maintenance Prepared By: Allison Fowler, Assistant Administrator Subject: Dacusville Community Center HVAC Request Summary: Funding Request and Source of Funds Documents Included: State Appropriations Contract Action Requested: Approval Staff Recommendation: Approval Previous Council Action (if any): N/A Additional Notes: Page 67 of 71 Page 68 of 71 Page 69 of 71 Page 70 of 71 Page 71 of 71

Source: Pickens County website. First collected Nov 21, 2026.