Public Facilities and Safety Committee — Agenda Packet
Beaufort County · Beaufort County · Public Facilities Committee · meeting of Aug 28, 2023 · Agenda packets
Open the original document More from Beaufort County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, August 28, 2023
2:00 PM
AGENDA
COMMITTEE MEMBERS:
BLOGAN CUNNINGHAM, CHAIRMAN DAVID P. BARTHOLOMEW, VICE-CHAIRMAN
THOMAS REITZ PAULA BROWN
ANNA MARIA TABERNIK JOSEPH F. PASSIMENT, EX-OFFICIO
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. PUBLIC NOTIFICATION OF THIS MEETING HAS BEEN PUBLISHED, POSTED, AND DISTRIBUTED IN
COMPLIANCE WITH THE SOUTH CAROLINA FREEDOM OF INFORMATION ACT
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES - May 22, 2023 and June 26, 2023
6. CITIZEN COMMENT PERIOD - 15 MINUTES TOTAL
Anyone who wishes to speak during the Citizen Comment portion of the meeting will limit their
comments and speak no longer than three (3) minutes. Speakers will address Council in a respectful
manner appropriate to the decorum of the meeting, refraining fr om the use of profane, abusive, or
obscene language. In accordance with Beaufort County's Rules and Procedures, giving of a speaker's
time to another is not allowed.
7. UPDATE FROM ASSISTANT COUNTY ADMINISTRATOR, JARED FRALIX
AGENDA ITEMS
8. RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE INTERIM COUNTY ADMINISTRATOR TO
EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE FEE SIMPLE PURCHASE OF REAL
PROPERTY WITH TMS NUMBER R112-032-000-0637-0000, R112-032-000-0008-0000, AND R112-032-000-
0064-0000 ALSO KNOWN AS CHERRY HILL OAK (FISCAL IMPACT: Up to $1,550,000 plus closing costs -
Rural and Critical Program; Account # 4500)
1
County Council Agenda – Beaufort County, SC
9. RECOMMEND APPROVAL OF A RESOLUTION TO APPROVE THE HILTON HEAD ISLAND AIRPORT COST
RECOVERY MODEL AND REVISED AIRLINE RATES (FISCAL IMPACT: $500,000 positive revenue)
10. RECOMMEND APPROVAL OF A RESOLU TION TO ACCEPT SC AERONAUTICS COMMISSION GRANT OFFER
23-029 FOR $12,000,000 FOR HDX TERMINAL IMPROVEMENTS (FISCAL IMPACT: no fiscal impact)
11. RECOMMEND APPROVAL OF A CONTRACT AWARD TO EDISON FOARD, INC. FOR PHASE I OF THE HILTON
HEAD ISLAND AIRPORT COMMERCIAL SERVICE TERMINAL IMPROVEMENTS. (FISCAL IMPACT: The contract
fee is $27,196,809.29 - FAA Grants $22,600,000, SC Aeronautics Grants $3,000,000, SC Budget Line Item
$12,000,000, Airport Budget $2,200,000)
12. RECOMMEND APPROVAL OF A RESOLUTION BY THE BEAUFORT COUNTY COUNCIL AUTHORIZING THE
BEAUFORT EXECUTIVE AIRPORT FACILITY USE RATE CHANGES (ARW) FACILITY USE RATE CHANGES (FISCAL
IMPACT: Associated Airport Revenue $71,434.00 FY23 and $100,000.00 estimated FY24)
13. RECOMMEND APPROVAL OF A RESOLUTION AND AN INTERIM LETTER OF AGREEMENT F OR SHUTTLE
SERVICES BETWEEN BEAUFORT COUNTY AND THE BEST OF HILTON HEAD (FISCAL IMPACT: Hilton Head
Island Airport will receive a monthly fee of $1.00 per passenger)
14. RECOMMEND APPROVAL OF A CONTRACT TO AWARD IFB #081023E, BLUFFTON PARKWAY PATHWAY
PROJECT, TO FIRST CONSTRUCTION MANAGEMENT (FISCAL IMPACT: $227,010.44 funding source 2018
transportation sales tax)
15. RECOMMEND APPROVAL TO PURCHASE A MOWER MAX WITH FRONT LIFT AND BOOM ATTACHMENTS
FOR THE PUBLIC WORKS DEPARTMENT - ROADS AND DRAINAGE DIVISION (FISCAL IMPACT: $276,786.29
- Funding Source Capital Improvement Fund)
16. RECOMMEND APPROVAL TO PURCHASE A BUCKET TRUCK UNDER STATE CONTRACT #060920 (DODGE
RAM 5500 4X4 CUMMINS DIESEL TEREX LT40) FOR TRAFFIC OPERATIONS (FISCAL IMPACT: $162,299 -
Funding Source Capital Improvement Fund)
17. RECOMMEND APPROVAL TO PURCHASE A DUMP TRUCK FOR THE PUBLIC WORKS DEPARTMENT
THROUGH THE SOURCE WELL CONTRACT # 060920 - ROADS AND DRAINAGE DIVISION (FISCAL IMPACT:
$253,143.00 - Funding Source Capital Improvement Fund)
18. RECOMMEND APPROVAL TO PURCHASE FOUR REPLACEMENT AMBULANCES FOR BEAUFORT COUNTY
EMS DEPARTMENT (FISCAL IMPACT: Total Cost: $1,039,984.00 funding source Capital Improvement
Fund)
EXECUTIVE SESSION
19. PURSUANT TO S. C. CODE SECTIONS 30-4-70(A)(2) AND (A)(1) TO RECEIVE LEGAL ADVICE COVERED BY THE
ATTORNEY-CLIENT PRIVILEGE RELATING TO THE APPOINTMENT OF PERSONS TO A PUBLIC BODY AND
DISCUSSION OF THE APPOINTMENTS OF SUCH PERSONS (2024 SUPER-PENNY ADVISORY BOARD).
20. PURSUANT TO S.C. CODE SEC. 30 -4-70(A)2): RECEIPT OF LEGAL ADVICE WHERE THE ADVICE RELATES TO
THE POTENTIAL PURCHASE OF REAL PROPERTY AND/OR POTENTIAL CONDEMNATION LITIGATION
(SHEPPARD, CAUSEY WAY AND DOCK BUILDERS DRIVE).
21. MATTERS ARISING OUT OF EXECUTIVE SESSION
22. ADJOURNMENT
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
2
Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, May 22, 2023
3:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or
the complete meeting. https://beaufortcountysc.new.swagit.com/videos/230728
1. CALL TO ORDER
Committee Chairman Cunningham called the meeting to order at 3:00 pm
PRESENT
Chairman Logan Cunningham
Vice-Chairman David P. Bartholomew (arrived at 3:22 PM)
Council Member Paula Brown
Council Member Anna Maria Tabernik
Ex-Officio Joseph F. Passiment
Council Member York Glover (arrived at 3:07 PM)
Council Member Alice Howard
Council Member Mark Lawson
Council Member Lawrence McElynn
Council Member Thomas Reitz
ABSENT
Council Member Gerald Dawson
2. PLEDGE OF ALLEGIANCE
Committee Chairman Cunningham led the Pledge of Allegiance.
3. FOIA
Committee Chairman Cunningham noted that public notification of this meeting had been published,
posted, and distributed in compliance with the South Carolina Freedom of Information Act.
4. APPROVAL OF AGENDA
Motion: It was moved by Council Member Passiment, seconded by Council Member McElynn, to approve
the agenda.
The Vote - The motion was approved without objection.
5. APPROVAL OF MINUTES
3
Item 5.
County Council Minutes – Beaufort County, SC
Motion: It was moved by Council Member Tabernik, seconded by Council Member Brown, to approve the
minutes from April 24, 2023.
The Vote - The motion was approved without objection.
6. CITIZEN COMMENT PERIOD- 15 MINUTES TOTAL
No Citizen Comments.
7. DISCUSSION ON REIMAGINE RIBAUT ROAD
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=142
Motion: It was moved by Council Member Howard, seconded by Council Member Passiment, to start the
discussion on Reimaging Ribaut Road.
Director of Engineering Eric Claussen briefed the Committee on Reimagine Ribaut Road's website, citizens
survey, multimodal transport conditions, and road safety. Director Claussen also gave an overview of the
project's 8-month timeline, actions taken so far, including a public symposium on April 20th, and planned
next steps, including a multiday workshop in late June where citizens can provide design input.
Council Member Howard commented on how well the April 20th symposium went and the good amount
of feedback received from the public.
8. RECOMMEND APPROVAL OF AN ORDINANCE ( by title only ) AUTHORIZING THE COUNTY
ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE
PURCHASE OF A PORTION OF REAL PROPERTY LOCATED ON HIGHWAY 170 WITH TMS NO. R600 008 000
0005 0000
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=675
Assistant County Administrator Fralix discussed the plans to create an offsite law enforcement center or
regional administration campus on the Cooler Tract, which is adjacent to the property being discussed.
County Attorney Ward gave a presentation with GIS mapping of the 20 -acre property available for
purchase and the Oldfield community’s requests for road alignment to create a backdoor access road and
for an equestrian trail over the Cooler Tract’s wetlands.
Council Member Glover and County Attorney Ward discussed the access road and the property that the
County is proposing to purchase.
Council Member Lawson asked about the acreage of wetlands on the property and the estimated costs
for creating the access road. County Attorney Ward replied that visuals show 3 acres of wetlands, but that
they would hire a wetland consultant to confirm. ACA Fralix commented that the relative cost to build the
road is small compared to the Law Enforcement Center’s $90 million expense.
Council Member Howard asked if the equestrian trail would be open to other members of the public.
County Attorney Ward replied that the intention is not to have the trail open to the public and that the
easement would be held by Oldfield.
Committee Chairman Cunningham and County Attorney Ward discussed the placement of the access
road.
County Attorney Ward also highlighted how the Planned Urban Development (PUB) Agreement requires
Oldfield to donate 6 of the 20 acres to the County and the requirement for the County to build a
government facility, like an EMS or fire station on the property within ten years.
4
Item 5.
County Council Minutes – Beaufort County, SC
The Committee and ACA Fralix discussed the need for an EMS and fire station in that area.
Council Member Glover and County Attorney Ward discussed the requirement to build a government
facility on the six acres of donated land.
Motion: It was moved by Council Member Passiment, seconded by Council Member Tabernik, to
recommend approval of an Ordinance (by title only) authorizing the County Administrator to execute the
necessary documents and provide funding for the purchase of a portion of real property located on
Highway 170 with TMS NO. R600 008 000 0005 0000.
Discussion: Council Member Tabernik asked about the approximate cost of the purchase. County Attorney
Ward replied that the purchase is still under negotiations and that the ballpark amount would be $60,000
per acre.
The Vote - The motion was approved without objection.
9. RECOMMEND APPROVAL OF A RESOLUTION AND APPROVAL TO ENTER INTO AN IGA WITH THE TOWN
OF HILTON HEAD FOR AN EXPENDITURE OF TRANSPORTATION IMPACT FEES ON THE ADAPTIVE TRAFFIC
SIGNAL MANAGEMENT (ATSM) SYSTEM (FISCAL IMPACT: $3,100,000 TO COME FROM ACCOUNT
23020011-51160 WITH A BALANCE OF $3,298,434)
Motion: It was moved by Council Member Passiment, seconded by Council Member Glover, to
recommend approval of a Resolution to enter into an IGA with the Town of Hilton Head for an expenditure
of Transportation Impact Fees on the Adaptive Traffic Signal Management (ATSM) System.
The Vote - The motion was approved without objection.
10. RECOMMEND APPROVAL OF A RESOLUTION ESTABLISHING A TAX ADVISORY COMMITTEE TO PLAN FOR
A FUTURE SALES TAX PROGRAM
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=1810
ACA Fralix briefed the Committee on the plan to hold a sales tax referendum in November 2024,
discussions with municipalities about a 25 -year plan to address roads, buildings, and schools, and the
proposed six-member community as a next step.
Motion: It was moved by Council Member Howard, seconded by Council Member Passiment, to
recommend approval of a Resolution establishing a Tax Advisory Committee to plan for a future sales tax
program.
Discussion: Council Member Glover asked about planning for school infrastructure. ACA Fralix
commented on ongoing discussions with the schools and the school district and education capital project
taxes that allow for the development of schools.
Council Member Glover also raised concerns about representation.
The Committee, ACA Fralix, and County Administrator Greenway discussed the size and makeup of the
Tax Advisory Committee.
The Vote - The motion was approved without objection.
11. RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE
THE NECESSARY DOCUMENTS FOR THE PURCHASE OF A PORTION OF THE REAL PROPERTY ABUTTING
THE HILTON HEAD ISLAND AIRPORT LOCATED ON SUMMIT DRIVE WITH TMS NO. R510 005 000 271A
0000
Please watch the video stream available on the County's website to view the full discussion.
5
Item 5.
County Council Minutes – Beaufort County, SC
https://beaufortcountysc.new.swagit.com/videos/230728?ts=2362
Deputy Director Steve Perry provided background on Exec-Air, including their hanger building's proximity
to Hilton Head Airport's taxiways and the appraisal and planned purchase of the property.
Motion: It was moved by Council Member Passiment, seconded by Council Member Bartholomew, to
recommend approval of a Resolution authorizing the County Administrator to execute the necessary
documents for the purchase of a portion of the real property abutting the Hilton Head Island Airport
located on Summit Drive with TMS NO. R510 005 000 271A 0000.
The Vote - The motion was approved without objection.
Council Member Glover and Deputy Director Perry discussed the acreage of the property.
12. HILTON HEAD ISLAND AIRPORT (HXD) AND BEAUFORT EXECUTIVE AIRPORT (ARW) HANGAR RENT
INCREASE
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=2471
Deputy Director Steve Perry discussed the increa se of hanger fees for hangers at Beaufort Executive
Airport and Hilton Head Airport to support maintenance and upgrades.
Motion: It was moved by Council Member Brown, seconded by Council Member Tabernik, to recommend
approval of a hangar fee increase at the Hilton Head Island Airport (HXD) and Beaufort Executive Airport
(ARW).
The Vote - The motion was approved without objection.
13. RECOMMEND APPROVAL OF A CONTRACT AWARD TO WSP FOR THE JOE FRAZIER ROAD CORRIDOR
STUDY (FISCAL IMPACT: $213,890)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=2561
Director Claussen briefed the Committee on the study to be undertaken by WSP to look at the capacity,
safety, and walkability of the corridor. Director Claussen also noted that the project will move toward the
final design once adopted by the Planning Commission and County Council.
Motion: It was moved by Council Member Passiment, seconded by Council Member Brown, to
recommend approval of a contract award to WSP for the Joe Frazier Road Corridor Study.
Discussion: Council Member Glover asked for a map to be included in the presentations.
The Vote - The motion was approved without objection.
14. RECOMMEND APPROVAL OF A CONTRACT AWARD TO HDR ENGINEERING, INC FOR THE US 21
CORRIDOR ACCESS MANAGEMENT PLAN (FISCAL IMPACT: $217,992.92)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=2704
Director Claussen briefed the Committee on the plan to get ahead of develop ment along the US 21
corridor and to have HDR Engineering, Inc. look at access management, safety, and pedestrian
accommodations. Director Claussen said they would also be looking at safety improvements at specific
locations around US 21 and Laurel Bay, including for right turn lanes.
6
Item 5.
County Council Minutes – Beaufort County, SC
Motion: It was moved by Council Member Tabernik, seconded by Council Member Howard, to
recommend approval of a contract award to HDR Engineering, Inc for the US 21 Corridor Access
Management Plan.
Discussion: Council Member H oward asked if Laurel Bay is a hotspot for accidents. Director Claussen
replied that they are seeing crashes with the right turn lanes.
Council Member Glover commented that US 21 is a major thoroughfare and asked whether that would
be taken into account in the study. Director Claussen replied that the plan is to get ahead of development
and determine the best locations for traffic signals and improve access management.
The Vote - The motion was approved without objection.
15. RECOMMEND APPROVAL OF A RES OLUTION TO USE IMPACT FEES TO RETAIN HDR ENGINEERING, INC
TO STUDY, RECOMMEND, AND DESIGN ENHANCEMENTS TO BLUFFTON PARKWAY PEDESTRIAN
ACCOMMODATIONS AND AESTHETICS AKA BLUFFTON PARKWAY ENHANCEMENT PROJECT ( FISCAL
IMPACT: $259,954.84)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=2889
Director Claussen discussed the plan to showc ase what a corridor could look like in terms of enhanced
walkability, lighting, traffic signals, landscaping, pedestrian crossings, and wider concrete trails on a half-
mile section between River Ridge and the Hampton Lake signal. Director Claussen added th at the final
design is expected to be completed by the end of 2023 and that construction would be completed prior
to October 2024 so that the showcase can be ready before the 2024 Sales Tax.
Motion: It was moved by Council Member Passiment, seconded by Council Member McElynn, to
recommend approval of a Resolution to use Impact Fees to retain HDR Engineering, Inc to study,
recommend, and design enhancements to Bluffton Parkway Pedestrian Accommodations and Aesthetics
AKA Bluffton Parkway Enhancement Project.
Discussion: Council Member Tabernik noted that it was south of the Broad River impact fees.
The Vote - The motion was approved without objection.
16. RECOMMENDATION OF AWARD TO KIMLEY HORN FOR THE INTELLIGENT TRANSPORTATION SYSTEMS
(ITS) MASTER PLAN (FISCAL IMPACT: $275,000.00 TO BE PAID FROM ACCOUNT 10401243-54500 WITH
A BALANCE OF $4,353,958.64)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=3034
Director Claussen commented on the use of intelligent transportation systems, like smart signals, dynamic
message signs, and travel time, to address capacity and safety throughout the County and in surrounding
counties. Director Claussen noted that the Lowcountry Area Transportation Study (LATS) is funding 80%
of the project.
Motion: It was moved by Council Member Passiment, seconded by Council Member Howard, to
recommend approval of an award to Kimley Horn for the Intelligent Transportation Systems (ITS) Master
Plan.
Discussion: Committee Chairman Cunningham that the County is only responsible for $55,000 and that
LATS is covering the rest.
Director Claussen explained the role of Metropolitan Planning Organizations in looking at transportation
needs across communities.
7
Item 5.
County Council Minutes – Beaufort County, SC
The Vote - The motion was approved without objection.
17. RECOMMENDATION OF CONTRACT AWARD TO TRINITY ELECTRICAL FOR THE HHI AIR TRAFFIC CONTROL
TOWER TECHNOLOGY IMPROVEMENTS. (FISCAL IMPACT: $268,695.00)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=3206
Deputy Director Perry commented on the importance of air traffic control towers, the Bipartisan
Infrastructure Law grant award for improvements and upgrades to aging equipment, and the proposed
contract with Trinity Electrical.
Motion: It was moved by Council Member Tabernik, seconded by Council Member Reitz, to recommend
approval of a contract award to Trinity Electrical for the HHI Air Traffic Control Tower Technology
Improvements.
The Vote - The motion was approved without objection.
18. RECOMMEND APPROVAL OF A CONTRACT AWARD TO LSP3 FOR THE DESIGN OF THE PUBLIC WORKS
BUILDING (FISCAL IMPACT: $1,467,636)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/230728?ts=3352
Director Neil Desai provided background on the needs assessment that an opportunity for the public
works facility to gain additional space, the selection of LSP3, and funding for the contract.
Motion: It was moved by Council Member Howard, seconded by Council Member Passiment, to
recommend approval of a contract award to LSP3 for the design of the Public Works Building.
Discussion: Council Member Howard asked if the design project would include looking at different sites
or if it would focus on the existing campus. Director Desai confirmed that the plans would be for the
existing campus.
The Vote - The motion was approved without objection.
19. EXECUTIVE SESSION
Motion: It was moved by Council Member Passiment, seconded by Council Member Brown, to enter into
an executive session pursuant to S.C. Code Sec. 30-4-70 (A) (1) discussion of appointments of persons to
a public body (Green Space Advisory Committee).
The Vote - The motion was approved without objection.
The Committee was in executive session from 3:58 PM to 4:13 PM.
20. MATTERS ARISING OUT OF EXECUTIVE SESSION
Motion: It was moved by Council Member Tabernik, seconded by Council Member Howard, to forward to
the Council, for its consideration and approval, the recommendation of the Green Space Task Force as
presented in the executive session.
The Vote - The motion was approved without objection.
21. ADJOURNMENT
Adjourned at or around 4:15 PM.
Ratified:
8
Item 5.
Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, June 26, 2023
3:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the
complete meeting. https://beaufortcountysc.new.swagit.com/videos/250982
1. CALL TO ORDER
Committee Vice-Chair David Bartholomew called the meeting to order.
PRESENT
Vice-Chairman David P. Bartholomew
Council Member Thomas Reitz
Council Member Paula Brown
Council Member Anna Maria Tabernik
Council Member Alice Howard
Council Member York Glover
Council Member Gerald Dawson
Council Member Lawrence McElynn
ABSENT
Chairman Logan Cunningham
Council Member Joseph F. Passiment
2. PLEDGE OF ALLEGIANCE
Committee Vice-Chair David Bartholomew led the pledge of allegiance.
3. FOIA
Committee Vice -Chairman Bartholomew noted that public notification of this meeting had been
published, posted, and distributed in compliance with the South Carolina Freedom of Information Act.
4. APPROVAL OF AGENDA
Motion: It was moved by Council Member McElynn, seconded by Council Member Glover, to approve
the agenda.
The Vote – The motion was approved without objection.
9
Item 5.
County Council Minutes – Beaufort County, SC
5. APPROVAL OF MINUTES
Motion: It was moved by Council Member Tabernik, seconded by Council Member McElynn, to approve
the minutes of March 27, 2023.
The Vote – The motion was approved without objection.
6. CITIZEN COMMENT PERIOD
No citizen comments.
7. RECOMMEND APPROVAL OF AN ORDINANCE AMENDING ORDINANCE 2022/45 BY REMOVING THE
PROPERTY LOCATED AT 68 HELMSMAN WAY WITH TMS NO. R552 010 000 0309 0000 AND OTHER
MATTERS RELATED THERETO
Motion: It was moved by Council Member Tabernik, seconded by Council Member McElynn, to
recommend approval of an ordinance amending Ordinance 2022/45 by removing the property located
at 68 Helmsman Way with TMS No. R552 010 000 0309 0000 and other matters related thereto.
Discussion: Council Member Tabernik asked about ownership of 68 Helmsman Way. County Attorney
Ward replied that SCDOT is the property owner and that County staff are working with SCDOT on a
permanent lease.
The Vote – The motion was approved without objection.
8. RECOMMEND APPROVAL OF AN ORDINANCE TO AMEND THE BEAUFORT COUNTY ORDINANCE
REGARDING A ROAD USE FEE
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=193
Motion: It was moved by Council Member Howard, seconded by Council Member Glover, to
recommend approval of an ordinance to amend the Beaufort County Ordinance Regarding a Road Use
Fee.
Discussion: Assistance County Administrator Fralix discussed how the road use fee is applied to
registered vehicles and supports the maintenance of County roads and facilities. ACA Fralix also
discussed the implications of the Bruns v. Greenville County court case and the introduction of
legislation to allow the road use fee to continue in a modified state. ACA Fralix added that staff
recommends the fee be increased to $20.
Council Member Dawson and ACA Fralix discussed the purpose of the fee increase and funding provided
for road projects.
Council Member Howard and Engineering Department Director Claussen discussed the miles of unpaved
roads in the County.
Council Member Tabernik and ACA Fralix discussed how the road use fee would keep pace with
maintenance efforts on County roads. Director Claussen added that the fee would be evaluated on an
annual basis.
The Vote – The motion was approved without objection.
9. RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE DEMOLITION OF STRUCTURES AND
FUNDING FOR DEMOLITION OF STRUCTURES ON BEAUFORT COUNTY OWNED P ROPERTY LOCATED AT
2 MULLET STREET
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=748
10
Item 5.
County Council Minutes – Beaufort County, SC
Motion: It was moved by Council Member McElynn, seconded by Council Member Reitz, to recommend
approval of a resolution authorizing the demolition of structures and funding for demolition of structures
on Beaufort County owned property located at 2 Mullet Street.
Discussion: County Attorney Ward commented on the purchase to expand parking lots and other
infrastructure, the appraisal conducted, and the recommendation to demolish the current dock system.
Public Works Director Desai commented on the engagement of a marine contractor to inspect the dock
and how the assessment determined that demolishing the dock structure would be the better cost and
safety option.
The Vote – The motion was approved without objection.
10. RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE
MUTUAL AID AGREEMENTS REGARDING RELOCATION OF DETAINEES ON A TEMPORARY BASIS DURING
AN EMERGENCY, WITH AIKEN COUNTY, ALLENDALE COUNTY, CHARLESTON COUNTY, COLLETON
COUNTY, DORCHESTER COUNTY, FLORENC E COUNTY, GREENVILLE COUNTY, HAMPTON COUNTY,
JASPER COUNTY, LEXINGTON COUNTY, ORANGEBURG COUNTY, AND RICHLAND COUNTY
Motion: It was moved by Council Member Howard, seconded by Council Member Dawson, to
recommend approval of a resolution authorizing the County Administrator to execute mutual aid
agreements regarding relocation of detainees on a temporary basis during an emergency, with Aiken
County, Allendale County, Charleston County, Colleton County, Dorchester County, Florence County,
Greenville County, Hampton County, Jasper County, Lexington County, Orangeburg County, and
Richland County.
Discussion: ACA Robinson commented on the renewal of annual contracts, the extension of the
contracts for five years, and the reciprocal service provided.
Council Member Tabernik and ACA Robinson discussed how Beaufort County had transferred inmates to
other facilities as part of these mutual aid agreements.
The Vote – The motion was approved without objection.
11. RECOMMEND APPROVAL OF A RESOLUTION TO APPROVE THE USE OF TRANSPORTATION IMPACT FEES
FOR A CONTRACT AWARD TO W.M. ROEBUCK, INC. FOR THE CONSTRUCTION OF A TEMPORARY WOOD
POLE TRAFFIC SIGNAL AT THE INTERSECTION OF US 278 AND CROSSTREE DRIVE/GATEWAY DRIVE
(WINDMILL HARBOUR) USING SCDOT'S STATEWIDE CONTRACT (FISCAL IMPACT: up to $500,000.00)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=1060
Motion: It was moved by Council Member Tabernik, seconded by Council Member Brown, to recommend
approval of a resolution to approve the use of transportation impact fees for a contract award to W.M.
Roebuck, Inc. for the construction of a temporar y wood pole traffic signal at the intersection of US 278
and Crosstree Drive/Gateway Drive (Windmill Harbour) using SCDOT’s statewide contract.
Discussion: County Administrator Greenway commented on Windmill Harbour’s longstanding traffic
issues and approval by SCDOT Secretary Hall to create a temporary signal because of SC 278’s five -year
bridge construction project.
Council Member Tabernik asked about the decision to put in a temporary signal instead of the mast arms.
County Administrator Greenway replied that the mast arms can only be installed once road improvements
are completed.
Committee Members commented on the ten-year request to add a traffic light and thanked County staff
for moving this issue forward.
11
Item 5.
County Council Minutes – Beaufort County, SC
The Vote – The motion was approved without objection.
12. RECOMMEND APPROVAL OF A RESOLUTION TO APPROVE THE USE OF TRANSPORTATION IMPACT FEES
FOR A CONTRACT AWARD TO W.M. ROEBUCK, INC. FOR IFB #053123 CONSTRUCTION OF MAST ARM
INTERSECTION AT BLUFFTON PARK WAY, FLAY CREEK DR, AND RIVER RIDGE DR ( FISCAL IMPACT:
$384,984.60)
Motion: It was moved by Council Member McElynn, seconded by Council Member Tabernik, to
recommend approval of a resolution to approve the use of transportation impact fees for a contract award
to W.M. Roebuck, Inc. for IFB #053123 construction of mast arm intersection at Bluffton Parkway, Flay
Creek Dr, and River Ridge Dr and to move this time-sensitive item forward to full Council tonight.
Discussion: Director Claussen commented that the item would replace a wood pole signal put in last year
with a mast arm signal.
Council Member Tabernik and Director Claussen discussed how the mast arm signal was chosen to match
other poles on Bluffton Parkway.
The Vote – The motion was approved without objection.
13. RECOMMEND APPROVAL OF A RESOLUTION TO APPROVE THE USE OF TRANSPORTATION IMPACT FEES
FOR A CONTRACT AWARD TO APAC ATLANTIC FOR IFB #062323 SC 170 NEAR -TERM IMPROVEMENTS
FOR THE CONSTRUCTION OF CAPACITY AND SAFETY IMPROVEMENTS FROM OKATIE CENTER SOUTH TO
SC 462 (FISCAL IMPACT: $8,111,030.29)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=1448
Motion: It was moved by Council Member Glover, seconded by Council Member McElynn, to recommend
approval of a resolution to approve the use of transportation impact fees for a contract award to APAC
Atlantic for IFB #062323 SC 170 near -term improvements for the construction of capacity and safety
improvements from Okatie Center south to SC 462.
Discussion: Director Claussen commented on the plan to enter into a cost-share agreement with the City
of Hardeeville and Jasper County to address safety capacity concerns at spot locations along SC 170 and
the incorporation of scheduled DOT work to address better lane utilization.
The Vote – The motion was approved without objection.
14. RECOMMEND APPROVAL OF A RESOLUTION TO APPROVE AN INTERGOVERNMENTAL AGREEMENT
WITH SCDOT FOR PAVEMENT OVERLAY AND PAVEMENT MARKING IMPROVEMENTS ON US278 AND
INTERCHANGE RAMPS TO BE INCLUDED IN THE SC170 NEAR -TERM IMPROVEMENTS PROJECT IN THE
COUNTY
Motion: It was moved by Council Member Tabernik, seconded by Council Member Howard, to
recommend approval of a resolution to approve an intergovernmental agreement with SCDOT for
pavement overlay and pavement marking improvements on US278 and interchange ramps to be included
in the SC170 near-term improvements project in the county.
The Vote – The motion was approved without objection.
15. RECOMMEND APPROVAL OF A REQUEST FOR PRIVATE ROAD ACCEPTANCE OF MASTER’S WAY
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=1716
Motion: It was moved by Council Member Reitz, seconded by Council Member Tabernik, to recommend
approval of a request for private road acceptance of Master’s Way.
12
Item 5.
County Council Minutes – Beaufort County, SC
Discussion: ACA Fralix commented on the location of Master’s Way, Hilton Head Christian’s road access
and signal development, and the County’s road acceptance policy and evaluation process. ACA Fralix
added that Master’s Way would connect Bluffton Parkway and H.E. McCracken Middle School. ACA
Fralix also highlighted the recommendation to accept Master’s Way into the County’s road inventory.
Council Member Tabernik asked if the County Transportation Committee knew about the
recommendation to accept Master’s Way and the road’s future maintenance needs. ACA Fralix replied
that the CTC had not been briefed yet, but that Master’s Way would be added to the next road network
evaluation and provided an overview of road rehabilitation.
The Vote – The motion was approved without objection.
16. RECOMMEND APPROVAL OF A CONTRA CT AWARD FOR RFP 050923 DISPOSAL AND RECYCLING
SERVICES FOR CONSTRUCTION AND DEMOLITION DEBRIS AND BULKY WASTE FOR BEAUFORT COUNTY
TO WASTE MANAGEMENT (FISCAL IMPACT: $250,000)
Motion: It was moved by Council Member Howard, seconded by Council Member Dawson, to recommend
approval of a contract award for RFP 050923 Disposal and Recycling Services for Construction and
Demolition Debris and Bulky Waste for Beaufort County to Waste Management.
Discussion: Director Desai commented on the recommendation to award Waste Management a three -
year unit rate contract with the option of two additional annual renewals.
The Vote – The motion was approved without objection.
17. RECOMMEND APPROVAL OF CONTRACT AWARDS FOR RFP 051023 (Y ARD WASTE RECYCLING) TO BE
DIVIDED BETWEEN GREEN RECYCLE RESOURCES AND OLIVER’S CLEAN BURN (FISCAL IMPACT:
COMBINED TOTAL OF $185,000)
Director Desai commented on the provision of yard waste disposal service and the addition of vendors to
create flexibility in operations.
Motion: It was moved by Council Member Howard, seconded by Council Member Brown, to approve
contract awards for RFP 051023 (Yard Waste Recycling) to be divided between Green Recycle Resources
and Oliver’s Clean Burn.
Discussion: Council Member Howard asked if the contract involved municipalities. Director Desai
confirmed that the contract was strictly County.
The Vote – The motion was approved without objection.
18. RECOMMEND APPROVAL OF A CONTRACT AWARD FOR RFP 030723 DEBRIS MA NAGEMENT
CONTRACTING SERVICES TO CERES AS PRIMARY AND CROWDER GULF AS SECONDARY CONTRACTOR
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=2152
Motion: It was moved by Council Member Tabernik, seconded by Council Member Howard, to vote on
items 18 and 19 as a package.
Discussion: Director Desai commented on the contract for services in an emergency event, such as a
named storm, and the selection of primary and secondary contractors.
Council Member Tabernik and Director Desai discussed the differences between air curtain incinerators
and controlled open burning.
The Vote – The motion was approved without objection.
13
Item 5.
County Council Minutes – Beaufort County, SC
19. RECOMMEND APPROVAL OF A CONTRACT AWARD FOR RFP 030823 DEBRIS MANA GEMENT
MONITORING SERVICES TO TETRA TECH
Items 18 and 19 were voted on as a package.
Director Desi commented on the debris monitoring services contract to meet FEMA reimbursement
requirements.
20. RECOMMEND APPROVAL OF A CONTRACT AWARD TO BEAUFORT CONSTRUCTION OF SC, LLC TO
CONSTRUCT A WAREHOUSE EXPANSION OF THE VOTERS REGISTRATION BUILDING ON 15 JOHN GALT
ROAD (FISCAL IMPACT: $358,000.00 plus $35,800.00 contingency for the construction of the warehouse
expansion)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=2306
Motion: It was moved by Council Member McElynn, seconded by Council Member Glover, to recommend
approval of a contract award to Beaufort Construction of SC, LLC to construct a warehouse expansion of
the Voters Registration Building on 15 John Galt Road.
Discussion: Capital Improvement Projects Director Larson commented on the 1,800-square-foot addition
to the building to expand the warehouse space and the 10% contingency to cover change orders.
Council Member Howard and Director Larson discussed the storage of voting equipment and the
calibration of machines.
Council Member Glover and Director Larson discussed the contract advertisement to solicit vendors, the
high demand for qualified contractors, and how Beaufort Construction of SC was the only bidder for the
project.
Council Member McElynn and Director Larson discussed building and operational security.
The Vote – The motion was approved without objection.
21. RECOMMEND APPROVAL OF A CONTRACT AWARD TO C.E. BOURNE & CO., INC. FOR CONSTR UCTION
SERVICES TO RENOVATE THE INTERIOR AND INSTALL A NEW HVAC SYSTEM IN THE MC RILEY POOL IN
BLUFFTON (FISCAL IMPACT: $1,950,200 plus $195,000.00 contingency for the construction of the MC
Riley Pool Phase II renovations)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=2519
Motion: It was moved by Council Member Glover, seconded by Council Member Tabernik, to recommend
approval of a contract award to C.E. Bourne & Co., Inc. for construction services to renovate the interior
and install a new HVAC system in the MC Riley Pool in Bluffton.
Discussion: Director Larson commented on the previous contract with C.E. Bourne to replace the roof of
the MC Riley Pool building and the second phase of the renovations, which include the installation of a
new HVAC system, removal of sliding doors, and minor upgrades to flooring and restro oms. Director
Larson added that the contract used the Omnia Cooperative contract program to solicit bids.
The Vote – The motion was approved without objection.
22. RECOMMEND APPROVAL OF A CONTRACT AWARD TO TITAN CONSTRUCTION MANAGEMENT FOR
CONSTRUCTION SERVICES TO CONSTRUCT PHASE 1 REPAIRS TO THE SPANISH MOSS TRAIL BRIDGE NEAR
THE TECHNICAL COLLEGE OF THE LOWCOUNTRY ON BATTERY CREEK (FISCAL IMPACT: $172,000.00 plus
$17,200.00 contingency for the construction of Phase 1)
14
Item 5.
County Council Minutes – Beaufort County, SC
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=2686
Motion: It was moved by Council Member Howard, seconded by Council Member Dawson, to approve a
contract award to Titan Construction Management for construction services to construct Phase 1 repairs
to the Spanish Moss Trail bridge near the Technical College of the Lowcountry on Battery Creek.
Discussion: Director Larson commented on project bidding and the project’s three phases.
Council Member Howard and Director Larson discussed the decision to split the project into three phases
because of challenges with soliciting bidders due to the need for specialty contractors and the plan to bid
the next phase later in the year.
Council Member Glover and Director Larson discussed updates and maintenance for other Spanish Moss
Trail bridges.
The Vote – The motion was approved without objection.
23. RECOMMEND APPROVAL OF A CONTRACT AWARD TO LGC GLOBAL FACILITY MANAGEMENT FOR THE
JANITORIAL SERVICES FOR BEAUFORT COUNTY RFP 040623 (FISCAL IMPACT: $809,356.96)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/250982?ts=2928
Motion: It was moved b y Council Member Dawson, seconded by Council Member McElynn, to
recommend approval of a contract award to LGC Global Facility Management for the Janitorial Services
for Beaufort County RFP 040623.
Discussion: Director Larson discussed the RFP process to hire new janitorial services for County facilities,
the interviews conducted with bidders, and the preference for LGC Global’s management team and
execution plan.
Council Member Dawson and Director Larson discussed LGC Global’s headquarters location and the plan
for them to set up a local office.
Council Member Howard , Council Member Glover, and Director Larson discussed the services still
provided by DSN consumers.
The Vote – The motion was approved without objection.
24. RECOMMEND APPROVAL OF AWARD FOR IFB #051223 TO COASTAL AIR TECHNOLOGIES FOR HVAC
REPLACEMENT AT THE BEAUFORT COUNTY COURTHOUSE (FISCAL IMPACT: $1,484,536.00)
Motion: It was moved by Council Member Glover, seconded by Council Member McElynn, to recommend
approval of an award for IFB #051223 to Coastal Air Technologies for HVAC replacement at the Beaufort
County Courthouse.
Discussion: Director Lawson commented on replacing the rooftop units, indoor air handling units, and the
chiller and that once awarded, the equipment would be 52 to 56 weeks out.
The Vote – The motion was approved without objection.
25. ADJOURNMENT
Adjourned: 3:55 PM
Ratified:
15
Item 5.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE INTERIM COUNTY ADMINISTRATOR TO
EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE FEE SIMPLE PURCHASE OF REAL
PROPERTY WITH TMS NUMBER R112-032-000-0637-0000, R112-032-000-0008-0000, AND R112-032-000-
0064-0000 ALSO KNOWN AS CHERRY HILL OAK
MEETING NAME AND DATE:
Public Facilities Committee Meeting, Monday, August 28, 2023
PRESENTER INFORMATION:
Ms. Amanda Flake, Natural Resources Planner (10 minutes)
ITEM BACKGROUND:
Rural and Critical Land Preservation Board recommended to pursue due diligence on 1/12/23, Land Use and
Community Services Committee recommended due diligence on 3/11/23, RCLP recommended to purchase on
6/8/23.
PROJECT / ITEM NARRATIVE:
Cherry Hill Oak – Fee (TMS 112-032-000-0637, 0008, 0064) properties consist of approximately 12 acres
zoned T4-N in the town of Port Royal with frontage along the marshes of Battery Creek. The property is
home to a 2012 Heritage Oak, known as the Cherry Hill Oak, as well as gravesite for an enslaved woman
known as Mary Pope.
The proposed purchase includes opportunity to purchase real properties identified as TMS R112-032-000-
0637-0000, and R112-032-000-0008-0000, R112-032-000-0064-0000 and also known as Cherry Hill Oak. The
agreed upon purchase price is $1,550,000.
FISCAL IMPACT:
Up to $1,550,000 plus closing costs (Rural and Critical Program; Account # 4500)
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval
OPTIONS FOR COUNCIL MOTION:
Motion to approve purchase of Cherry Hill Oak
Motion to modify purchased of Cherry Hill Oak
Motion to reject purchase of Cherry Hill Oak
16
Item 8.
1
RESOLUTION 2023/_____
A RESOLUTION AUTHORIZING THE INTERIM COUNTY ADMINISTRATOR TO
EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE FEE
SIMPLE PURCHASE OF REAL PROPERTY WITH TMS NUMBERS R112-032-000-0637-0000,
R112-032-000-0008-0000, AND R112-032-000-0064-0000 ALSO KNOWN AS
CHERRY HILL OAK
WHEREAS, the real property known as Cherry Hill Oak with TMS Numbers R112-032-000-
0637-0000, and R112 -032-000-0008-0000, R112-032-000-0064-0000 consisting of approximately 12
acres, collectively hereinafter “Property”, is the home to the 2013 South Carolina Heritage Tree, known as
the Cherry Hill Oak; and
WHEREAS, the fee simple owners of the Property desires to sell and Beaufort County (“County”)
desires to purchase the Property in order to protect the Cherry Hill Oak and the Property; and
WHEREAS, the fee simple purchase of the Property has been demonstrated to meet the Critical
Lands Criteria of the Rural and Critical Lands Program (“RCLP”); and
WHEREAS, the seller and County have negotiated a purchase price up to $1,550,000 plus closing
costs for the fee simple purchase of the Property; and
WHEREAS, on June 8, 2023, the proposed purchase of the Property was presented to the Rural
and Critical Land Preservation Board (RCLPB) and the RCLPB unanimously recommended approval of
the purchase of Property; and
WHEREAS, Beaufort County Council finds that it is in the best interest of the citizens and
residents of Beaufort County to purchase the Property as described above.
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly assembled, does
hereby authorize the Interim County Administrator to execute the necessary documents and provide funding
up to $1,550,000 plus closing costs for the fee simple purchase of real property with TMS Numbers R112-
032-000-0637-0000, and R112-032-000-0008-0000, R112-032-000-0064-0000 also known as Cherry Hill
Oak.
Adopted this ____ day of ______________, 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Joseph Passiment, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
17
Item 8.
Project Analysis: Cherry Hill Oak - Fee PROPOSAL FOR: Fee Purchase PROPERTY ID: TMS# TMS 112-032-000-0637, 0008, 0064 OWNER: Merry Land Investments, LLC ACREAGE: 11.92 acres PARTNERS: landowner, private, Town of Port Royal TOTAL PRICE: $1,550,000 PRICE Negotiated/Acre: $138,1460/acre RCLPP FUNDS: $1,550,000 APPRAISED VALUE: 1,788,000 ZONING: T4 NC – Town of Port Royal COUNCIL DISTRICT: 4 (Howard) LOCATION: Oakview Drive, Port Royal Project Location and Attributes: • Property is located off of Parris Island Gateway / Highway 21 • Property contains a South Carolina Heritage Tree, designated in 2013 by TreesSC • Property is sloping water front, including an accessible sandy spit that extends to back waters, marshes of battery creek. Purchase and Cost Structure: • Fee simple purchase proposed, landowner agreed to price lower than appraised value, RCLP pays 87% of appraised value • landowner will contribute $50,000 to tree maintenance • private funds raised for tree maintenance and park infrastructure • Town of Port Royal to accept maintenance responsibility for property RCLP Attributes: • Proximate to protected properties: OLT donated easement nearby “Pinckney easement” • Sloping waterfront and access to water in an area without any • Heritage Tree is documented to have larger diameter than Angel Oak in Charleston • No current park or passive recreation property in close proximity
18
Item 8.
Figure 1: Greenprint Composite
19
Item 8.
Figure 2: Location and other protected land
Figure 3: Greenprint Connectivity
20
Item 8.
Figure 4: Greenprint Critical Habitat
Figure 5: Greenprint Passive Recreation Priority
21
Item 8.
Figure 6: Greenprint Water Quality Priority
22
Item 8.
23
Item 8.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Resolution to approve the Hilton Head Island Airport Cost Recovery Model and Revised Airline Rates
MEETING NAME AND DATE:
Public Facilities and Safety Committee; August 28, 2023
PRESENTER INFORMATION:
Jon Rembold, Airports Director 3 Minutes
ITEM BACKGROUND:
Beaufort County Airports Board approved the Cost Recovery Model and the revised airline rates at
their regular meeting on July 20, 2023.
PROJECT / ITEM NARRATIVE:
The purpose of the Cost Recovery Model is to fully recover the airport’s operating costs attributable
to airline activity. A detailed cost analysis showed these costs were not being recovered through the
existing rates charged to the airlines since FY19. The revised rates reflect a two-phase (two years)
model that, when fully implemented, will fully recover the operating costs associated with airline
activities. This model is a “living” tool that will be updated twice each year in an effort to remain as
accurate as possible.
FISCAL IMPACT:
Implementation of the model results in revised airline rates. This is a revenue-generating item. Below
is a comparative table showing the rate changes for this first year of the two-year recovery.
FY19-23 FY24 Notes
Rent, Assigned Space $40.00 $70.00 Annual, per sq ft
Rent, Common Space $4.03 $5.22 Monthly, per pass.
Security Fees $2.13 $2.32 Monthly, per pass.
ARFF Fees (Firefighting) $3.75 $3.76 Monthly, per pass.
Landing Fees $1.31 $3.45 Monthly, per 1,000lbs
Cost to Operate Airport $3,390,687.00 $3,757,445.00 FY24 estimated
Cost Attributable to Airlines ~$3,216,678 $2,881,000.00 FY24 estimated
Airline Payments $1,509,663.00 $2,029,000.00 FY24 estimated
STAFF RECOMMENDATIONS TO COUNCIL:
Approve the resolution to approve the Hilton Head Island Airport Cost Recovery Model and Revised
Airline Rates
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny the Hilton Head Island Airport Cost Recovery Model and Revised Airline
Rates
Move forward to Council for approval on August 28, 2023
24
Item 9.
RESOLUTION 2023/_____
A RESOLUTION BY THE BEAUFORT COUNTY COUNCIL AUTHORIZING THE
HILTON HEAD ISLAND AIRPORT COST RECOVERY MODEL AND REVISED
AIRLINE RATES
WHEREAS, the Hilton Head Island Airport desires to fully recover the airport’s operating
costs that are attributable to airline activity; and
WHEREAS, a n extensive cost analysis showed these costs were not being recovered
through the existing rates charged to the airlines; and
WHEREAS, the Cost Recovery Model is a two-phased (two years) implementation model;
and
WHEREAS, the full implementation (second year) of the Cost Recovery Model will fully
recover the operating costs associated with airline activities; and
WHEREAS, Council has determined that it is in the best interests of its citizens to
implement the Cost Recovery Model and amend the existing airline rates.
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council , duly
assembled, does hereby authorize the Hilton Head Island Airport to implement the provisions of
Cost Recovery Model and revised airline rates.
Adopted this ____ day of __________, 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Joseph Passiment, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
25
Item 9.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Resolution to accept SC Aeronautics Commission Grant Offer 23-029 for $12,000,000 for HXD Terminal
Improvements
MEETING NAME AND DATE:
Public Facilities and Safety Committee; August 28, 2023
PRESENTER INFORMATION:
Jon Rembold; Airports Director
3 minutes
ITEM BACKGROUND:
Council Resolution 2022/25 directed staff to proceed with the terminal project.
June 2022: SC Senator Davis announced to County Council this item was approved as a line item in
the South Carolina Budget for FY 2023.
Beaufort County Airports Board approved the proposed resolution to accept the funding during its
regular meeting held July 20, 2023.
PROJECT / ITEM NARRATIVE:
In May 2022, South Carolina House Representative Jeff Bradley informed Beaufort County via the
Hilton Head Island Airport that, as a result of communications between the airport team, county
administration, and our state delegation, a $12,000,000 line item for HXD’s terminal construction was
to be part of the Governor’s approved budget.
As directed by the Governor’s Office, this grant will be used for terminal construction and is
administered through the SC Aeronautics Commission Office. This grant does not require a local
match.
FISCAL IMPACT:
This is a $12,000,000 line item in the state’s budget for the initial phase of terminal construction. It
does not require a match, so there is no fiscal impact. For information, the grant document details
the funding associated with this project. The airport’s portion of that funding will be required as
progress payments over the 2-year construction process. The airport/county will pay invoices and file
for reimbursement via these several grants. Reimbursement typically occurs within approximately
two weeks of a request. The airport can fund these progress payments thanks to the revised airline
rates/charges and past grants, which freed up funds.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval of the resolution to accept the $12,000,000 grant
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny Resolution to accept SC Aeronautics Commission Grant Offer 23-029 for
$12,000,000 for HXD Terminal Improvements
Move forward to Council for Approval on September 11, 2023
26
Item 10.
27
Item 10.
RESOLUTION 2023/_____
A RESOLUTION TO ACCEPT SCAC GRANT 23-029 FOR HILTON HEAD ISLAND
AIRPORT (HXD) TERMINAL CONSTRUCTION PROJECT
WHEREAS, this project involves the renovation and expansion of the commercial service
terminal at the Hilton Head Island Airport; and
WHEREAS, improvements include the addition to accommodate multiple airlines; post -
9/11 Transportation Security Administration -required security improvements including n ew
restrooms in the passenger boarding area and passenger baggage screening; refurbishment and
improvements; and
WHEREAS, the grant will be used to fund Phase I of the Hilton Head Island Airport
(HXD) terminal construction project. SCAC Grant total: $12 Million
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council , duly
assembled, does hereby authorize the County Administrator to accept SCAC Grant 23-029 for
Hilton Head Island Airport (HXD) terminal construction project
Adopted this ____ day of __________, 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Joseph Passiment, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
28
Item 10.
29
Item 10.
30
Item 10.
31
Item 10.
32
Item 10.
2553 Airport Boulevard
West Columbia, SC 29170
(803) 896‐6262
www.scaeronautics.com
Henry D. McMaster
GOVERNOR
Gary W. Siegfried
INTERIM
EXECUTIVE DIRECTOR
Aeronautics Commission
Delphin A. Gantt, Jr.
CHAIRMAN
Anne Esposito
DISTRICT 1
Vacant
DISTRICT 2
Skeets Cooper
DISTRICT 3
Lara Kaufmann
DISTRICT 4
Charles "Doug" Barnes
DISTRICT 5
Marco Cavazzoni
DISTRICT 6
Christopher Bethea
DISTRICT 7
August 14, 2023
Mr. Jon Rembold
Airports Director
Hilton Head Island Airport
120
Beach City Road
Hilton Head Island, SC 29926
Re: South Carolina Aeronautics Commission
Project No. 23‐029 Terminal Construction
Dear Mr. Rembold,
I am pleased to inform you that the South Carolina Aeronautics Commission
(SCAC) has approved your project application and awarded up to
$12,000,000.00 to Beaufort County for the Terminal Constructi
on Project
at the Hilton Head Island Airport (HXD).
This grant was approved based on your representation of local funding
availability and your ability to proceed promptly with the project.
Please execute the enclosed grant agreement and return one original to
SCAC at your earliest convenience.
This project qu
alifies for state and local government funds. Project costs
and funding are as follows:
FAA Funds $ 21,600,000.00
Local Funds $ 2,160,000.00
State Funds $ 12,000,000.00
Other Funds* $ 3,000,000.00
Total Project Cost $ 38,760,000.00
* SCAC Grant 23‐019
We are pleased to provide this funding. If we can be of further assistance,
please do not hesitate to call.
Sincerely,
Gary Siegfried, PE
Interim‐Executive Director
Enclosures: Grant
33
Item 10.
1
GRANT AGREEMENT
Part 1 - OFFER
Date of Offer: August 14, 2023 Project No.: 23-029
TO: Beaufort County, South Carolina
(referred to as the “Sponsor”)
FROM: The State of South Carolina (acting through the South Carolina Aeronautics Commission,
herein referred to as “SCAC”).
WHEREAS, The Sponsor has submitted to SCAC a Project Application dated November 30, 2022 a
grant of State Funds for a project for development of the Hilton Head Island Airport (Airport) together
with plans and specifications for such a project, as approved by SCAC, is hereby incorporated herein
and made a part hereof:
and
WHEREAS, SCAC has approved a project for development of the Airport (“herein called the
“Project”) consisting of the following described improvements and/or tasks:
Terminal Construction
All as more particularly described in the Airpor t Layout Plan and/or pl ans, and specifications
incorporated in the said Project Application:
NOW THEREFORE, pursuant to and for the purposes of carrying out the provisions of this grant and
in consideration of (a) the Sponsor’s adoption and ratification of the acceptance of this Offer and
Agreement, as hereinafter provided, and (b) the benefits to accrue to the State of South Carolina and
the public from the accomplishment of the project and the operation and maintenance of the Airport,
as herein provided.
THE STATE OF SOUTH CAROLINA ACTING THROUGH SCAC, HE REBY OFFERS AND
AGREES to pay, as South Carolina’s share of the allowable cost incurred in accomplishing the project
as per the following schedule:
Funding Source Amount
State (this grant) $ 12,000,000.00+
Sponsor $ 2,160,000.00*
Federal $ 21,600,000.00
Other $ 3,000,000.00**
+ HXD share from South Carolina 2023 Special Legislative allocation (no local match)
* Sponsor 10% match on Federal funding
** South Carolina special line-item funding (no local match)
for a total cost of $38,760,000.00 subject to the following:
34
Item 10.
2
1. The maximum obligation of the State of South Ca rolina payable under this
Offer and Agreement shall not exceed $12,000,000.00 which all parties to this
Agreement understand may be subject to the prior and continuing approval of the State
Fiscal Accountability Authority and the General Assembly and its component review
committees.
2. SCAC reserves the righ t to amend or withdraw this Offer at any time prior to
its binding acceptance by the Sponsor.
3. This Offer shall expire and the Stat e of South Carolina shall not be obligated
to pay any of the allowable costs of the Project unless this Offer has been accepted by
the Sponsor within 60 days from the above Date of Offer or such longer time as may
be prescribed by SCAC in writing.
4. The funds allocated by this Agreement sh all be held in escrow for a period of
one (1) year after the Date of Offer. If progress on the described project has not begun
at that time, the funds will revert to SCAC for reallo cation to other worthwhile
projects.
The Sponsor’s acceptance of this Offer and ratification and adoption of the Project
Application shall be evidenced by execution of Part II of this Agreement by the Sponsor. The
respective obligations under this Grant Agreement shall become effective upon the Sponsor’s
acceptance of the Offer and shall remain in full force and effect throughout the useful life of
the facilities developed under the project but in any event not to exce ed twenty (20) years
from the date of said acceptance.
STATE OF SOUTH CAROLINA
SOUTH CAROLINA AERONAUTICS COMMISSION
Signature By: __________________________________
Executive Director
___________________________________
D a t e
___________________________________
Sponsor’s Signature
_______ _____________________________
D a t e
August 14, 2023
35
Item 10.
3
PART II - SPONSOR ASSURANCES
In order to furnish SCAC with the Sponsor's assuran ces required by the applicable statutes,
regulations, policies, and proposed grant agreement, the Sponsor hereby covenants, and agrees with
SCAC as follows:
1. Covenants shall become effective upon acceptance by the Sponsor of State Aid for the Project
or any portion thereof, through SCAC, and shall constitute a part of the Grant Agreement thus
formed. These covenants shall remain in full force and effect throughout the useful life of the
facilities developed under the Project but in any event not to exceed twenty (20) years from
the date of acceptance of State Aid for the Proj ect. In the event th at the Airport and the
facilities covered by the Project are not maintained as such for public use for the full twenty
(20) years, the Sponsor agrees upon demand to promptly reimburse SCAC the amount of the
grant.
2. In the event that the grant is conditioned upon a repayment schedule of any or all of the
awarded funds, notwithstanding the other obligations herein that may require repayment in
the event of default or non-compliance with these grant assurances, the Sponsor agrees to be
bound by such additional grant assurances as may be required by SCAC as incorporated
hereto and set forth in a separate schedule to these assurances.
3. Sponsor shall:
a. begin accomplishment of the Project within a reasonable time after acceptance of this
Offer, but no later than one (1) year from award of this Offer;
b. carryout and complete the project in accordance with the terms of this agreement,
applicable policies and procedures requi red by SCAC, and app licable statutes,
regulations and fiscal policies of the State of South Carolina, and any applicable local
ordinances;
c. carryout and complete the project in accord ance with the plans and specifications
incorporated herein, including any revisions or modifications approved in writing by
SCAC. Sponsor further agrees to copy SCAC as to all construction progress reports,
payment applications, and completion documents and related correspondence;
d. submit all planning and construction documents to SCAC for review and approval;
and
e. notify SCAC, in writing, in a timely manner, and wi th appropriate support
documentation and/or electronic files, of any significant changes to the airport so that
same may be incorporated into SCAC’s records and/or databases, including the South
Carolina Airport System Plan. Significant changes include, but are not limited to:
new, upgraded, deactivated, or repurposed airfield pavement and lighting;
land acquisition or releases, including easements;
major obstruction clearing;
new, upgraded, or downgraded instrument procedures; and
new, revised, or expanded airport-related zoning ordinances.
4. Sponsor agrees that it will safely and efficiently operate the Airport for the use and benefit of
the public on fair and reasonable terms without discrimination.
36
Item 10.
4
5. Sponsor will suitably operate and maintain the Airport and all facilities thereon or connected
therewith which are necessary for airport purposes, and will not permit any activity which
could interfere with its use for aeronautical purposes other than temporary periods of snow,
flood, or other climatic conditions which could interfere detrimentally with such operation
and maintenance. Essential facilities, including airfield lighting systems, when installed, will
be operated in such manner as to assure their availability to all users of the Airport.
6. Sponsor will not enter into a ny transactions which could operate to deprive it of any of the
rights and powers necessary to perform any or all of the covenants made herein, unless by
such transaction the obligation to perform all such covenants is assumed by another public
agency eligible under the applicable statutes, ordinances, regulations and policies to assume
such obligations. If an arrangement is made for management or operation of the Airport by
any agency or person other than the Sponsor, the Sponsor will reserve sufficient powers and
authority to insure that the Airport will be operated and maintained in accordance with the
applicable statutes, ordinances, regulations, policies and covenants of this agreement.
7. Any misrepresentations or omis sion of a material fact by the Sponsor concerning the Project
or the Sponsor’s authority or ability to carry out the obligations assumed by the Sponsor in
accepting this Offer shall terminate the obligation of the State of Sout h Carolina and it is
understood and agreed by the Sponsor in accepting this Offer that if a material fact has been
misrepresented or omitted by the Sponsor, SCAC on behalf of the State of South Carolina,
may demand and recover from Sponsor all grant payments made, plus interest at the legal rate
prevailing at date of demand.
8. Sponsor shall maintain insuranc e in force at all times covering property damage on the project
to cover any and all losses. The amount of the coverage, per claim, shall, at a minimum, be
equal to the total cost of the project.
9. Sponsor shall maintain clear, safe, and econom ically viable approaches to the airport in
compliance with appropriate cr iteria set forth in one or mo re of the following airspace
standards:
FAR Part 77 Safe, Efficient Use, and Preservation of the Navigable Airspace, as amended;
Advisory Circular 150/5300-13A, Airport De sign, or successor guidance; or other
guidelines approved in writing or amended by SCAC.
Failure on the part of the Sponsor to take appropriate action to remove any and all obstructions
in the approaches, in a manner that ensures safety and protects public investment in the airport,
may result in withholding of any payment of the funds established by this agreement for the
herein described project until such time as the necessary actions are taken.
10. Sponsor shall enact a zoning ordinance on all land surrounding the airport under its
jurisdiction so as to conform, at a minimum, to the pertinent regulations and/or criteria of:
FAR Part 77, Safe, Efficient Use, and Pres ervation of the Navigable Airspace, as
amended;
Advisory Circular 150/5300-13B, Airport Design, or successor guidance;
Advisory Circular 150/5190-4A, A Model Zo ning Ordinance to Limit Height of
Objects Around Airports, or successor guidance; and
37
Item 10.
5
FAR Part 150, Airport N
oise Compatibility Planning, as amended.
The criteria in the ordinances shall limit the following items:
the height of objects around airports,
communication, visibility, and bird strike hazards,
incompatible land uses in the Runway Protection Zone (RPZ); and
if applicable, incompatible land uses within the 65 DNL noise contour.
Airport-related zoning ordinances shall have at least one attached sc aled map that clearly
illustrates the relevant airspace and land use zones. Sponsors shall submit to SCAC the
current zoning ordinance(s) and attached map(s) related to the airport, that have been
approved by the local government(s) having jurisdiction on lands surrounding the airport,
including pertinent signatures, seals, and dates of ordinances readings.
The Sponsor further agrees to develop proce dures necessary to comply with Section 55-
13-5 of the South Carolina Code of Laws, as amended regarding land use in the vicinity of
the Sponsor’s airports.
11. Sponsor will maintain a current Airport Layout Plan, having the current approval of SCAC,
showing existing and future landing areas and associated taxiways, pertinent approach surface
dimensions and slopes, Runway Protection Zo nes, and building ar eas. The Sp onsor will
conform to the current Airport Layout Plan in any future improvements or changes at the
Airport. The Sponsor shall furnish SCAC a current Airport Layout Plan and property plats in
all of the following formats:
paper of at least 24 inch by 36-inch size sheet(s);
Portable Document Format (PDF) electronic file(s).
GIS shapefile(s) or geodatabase in South Carolina State Plane coordinates; or
CAD DWG file(s) in South Carolina State Plane coordinates (International feet).
Sponsor shall be responsible for furnishing to SCAC such documents, data, and/or electronic
files as is necessary to keep the Airport Layout Plan, State Airport System Plan, and related
SCAC records and databases up to date.
12. Sponsor will furnish a set of "As Built Plans" or “Record Drawings” for the current project to
SCAC within ninety (90) days after completion of this project. The sponsor shall submit these
documents, at a minimum, in both paper and PDF electronic file formats
13. Sponsor shall pr ovide a qualified Resident Inspector who will be responsible for the approval
of all materials and workmanship and will maintain a daily project diary, submit weekly
progress reports to SCAC, and maintain a nd pr ovide documentation and certification to
SCAC that the work and materials comply with the plans and specifications. The requirement
for a Resident Inspector does not apply to projects under the direct control and supervision of
an independent registered professional engineer, architect, or construction manager hired by
the Sponsor, in which event the Sponsor agrees to contractually ob ligate the independent
professional engineer, architect, or construction manage r to assume responsibilities,
including, but not limited to, quality control as to mate rials and work manship, and
certification to SCAC that work and materials comply with plans and specifications.
38
Item 10.
6
14. Affidavit of Non-Collusion - South Carolina Code Section 39-3-10, et seq., 39-5-10, et seq.,
and Federal Law 15 U. S. Code, Section 1) are designed to ensure that any bids received by
Sponsor under this grant shall be competitive and free of collusion. As a condition precedent
to the award of any contract for this project there must be filed a sworn statement executed by
or on behalf of any person, firm, association, or corporation submitting a bid on any such
contract to be awarded; said sworn statement shall certify that such a person, firm, association,
or corporation submitting a bid on any such contract to be awarded; has not, either directly or
indirectly, entered into an agreement, participated in any collusion, or otherwise taken any
action in restraint of free completive bidding in connection with such contract. This sworn
statement shall be in the form of an affidavit executed and sworn to be the bidder before a
person who is authorized by the laws of the state to administer oaths. The original of such
sworn statement shall also include a provision to the effect that all legal formalities required
for the proper execution of affidavits, it shall not be a defense to such charge of perjury that
said formalities required for the proper execution of affidavits pursuant to state law have been
complied with. Thereaf ter, in any prosecution against an y person, firm, as sociation, or
corporation for perjury committed in the submission of said affidavits, it shall not be a defense
to such charge of perjury that said formalities were not in fact complied with. The Sponsor,
as part of this grant, agrees to require an affidavit of non-collusion of the prospective bidder
in the form attached thereto as Exhibit A.
15. Sponsor covenants and agrees to disburse funds derived fro m SCAC solely in aid of the
Project on the terms and conditions stated in this agreement. The Sponsor will obtain an audit
to comply with the Single Audit Act of 1984, Public La w 98-502 and the implementing
guidelines set forth in Office of Management and Budget Circular A-128 for any fiscal year
in which any of the Project Funds are expended. The Sponsor will forward to SCAC a copy
of the resulting audit reports along with a pl an for corrective action for any findings or
questioned costs related to the Project; within thirty (30) days after the audit report is issued.
16. Sponsor agrees that signifi cant activities to accomplish the project shall commence within one
(1) year from the date of grant shall be revoked and the funds re-allocated.
17. Sponsor agrees Project work and payment request shall be completed within four (4) years of
the execution of the Grant Agreement.
18. Sponsor shall request final reimbursement within ninety (90) calendar days after final project
acceptance.
19. Sponsor agrees and covenants that all work performed under this grant will be conducted and
completed in compliance with all local, state, and federal laws and regulations that are
applicable to any and all phases of the Project.
20. Sponsor agrees that these covenants and gr ant applications shall be binding on itself,
successors and assignees, and further covenants that it has the legal authority to enter into this
agreement.
39
Item 10.
7
PART III - ACCEPTANCE
__________________________________ (Sponsor) does hereby ratify and a dopt all statements,
representations, warranties, covenants, sponsor assurances and agreements contained in the Project
Application and incorporated materials referred to in the foregoing Offer and does hereby
unconditionally accept said Offer and by such acc eptance agrees to all of the terms and conditions
thereof.
Executed this ________________day of________________, 2023
______________________________________________________
(Name of Sponsor)
__________________________________
(Signature By)
_________________________________
(Title)
(Seal)
Attest__________________________
Title___________________________
CERTIFICATE OF SPONSOR’S ATTORNEY
I, _____________________________, acting as attorney for _______________________________
do hereby certify: That I have examined the foregoing Grant Agreement and the proceedings taken
by said _____________________ relating thereto, and find the Acceptance by Sponsor has been duly
authorized and that the execution thereof is in all respects due and proper and in accordance with the
laws of the State of South Carolina, and further that, in my opinion, said Grant Agreement constitutes
a legal and binding obligation of the Sponsor in accordance with the terms thereof.
Dated this______________________ day of_______________, 2023
Signature By______________________________
Title_____________________________________
40
Item 10.
8
EXHIBIT A
AFFIDAVIT OF NON-COLLUSION
STATE OF SOUTH CAROLINA
COUNTY OF__________________
Personally, appeared befo re me________________________________________________
being first duly sworn says that he is a member of the firm of ______________________________
and further says that his firm, association, or corporation has not, either directly or indirectly, entered
into any agreement, participated in any collusion, or otherwise taken any action in restraint of free
competitive bidding in connection with the submission of a bid on the above-named project.
Further, _____________ _____________________ swears and affirms that all
legal formalities required for the proper execution of affidavits pursuant to the laws of
his state has been complied with and further agrees, on behalf of himself, his firm,
association, or corporation, that in any subsequent prosecution for perjury of him, his
firm, association, or corporation, it shall not be a defense to such charge of perjury that
said formalities were not in fact complied with.
________________________________________
Legal Signature
SWORN to me before this____________ day of______________, 2023
Signature By________________________________
Notary Public for ____________________________
41
Item 10.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of Contract Award for Phase I of the Hilton Head Island Airport Commercial Service
Terminal Improvements to Edison Foard, Inc ($29,916,490.10)
MEETING NAME AND DATE:
Public Facilities and Safety Committee; August 28, 2023
PRESENTER INFORMATION:
Jon Rembold; Airports Director
(5 minutes)
ITEM BACKGROUND:
Council Resolution 2022/25 directed staff to proceed with the terminal project.
The project was initially bid in June 2022. The bids were above the project budget so, Council’s
approval, the team re-packaged the bid as an initial phase package, and it was then offered for bids.
Bids were received June 7, 2023. Three bids were received with the lowest bid being within the
project budget. The lowest qualified bid was provided by Edison Foard, Inc of Charlotte, NC in the
amount of $27,196,809.29.
Airports Board reviewed and approved the recommendation at its regular meeting on July 20, 2023.
PROJECT / ITEM NARRATIVE:
The initial phase includes the entrance road improvements, new TSA screening checkpoint, and new
boarding gate areas.
FISCAL IMPACT:
The contract fee is $27,196,809.29. Staff recommends a 10% contingency of $2,719,680.93, bringing
the project’s total cost to $29,916,490.10. The funding for this project is identified in the table below:
Funding for the initial phase:
FAA Grants $22,600,000
SC Aeronautics Grants $3,000,000
SC Budget Line Item $12,000,000
Airport $2,200,000*
*Airport share is 10% of the FAA discretionary funding. This amount is budgeted in the “Sponsor Share” line item. This
expense will be realized incrementally over a 3-5 year period.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award the contract for Phase I of the Hilton Head Island Airport
Commercial Service Terminal Improvements to Edison Foard, Inc.
OPTIONS FOR COUNCIL MOTION:
42
Item 11.
Motion to approve/deny the recommendation to award the contract for Phase I of the Hilton Head
Island Airport Commercial Service Terminal Improvements to Edison Foard, Inc.
(Next Step: Move forward to County Council for on September 11, 2023)
43
Item 11.
44
Item 11.
45
Item 11.
BID TABULATION
TERMINAL IMPROVEMENTS-PHASE 1-IFB# 041923
HILTON HEAD ISLAND AIRPORT
TBE PROJECT NO. 2119-1905
JUNE 7, 2023
BASE BID
ITEM SPEC
NO. NO. DESCRIPTION QTY UNIT UNIT PRICE EXT. TOTAL UNIT PR ICE EXT. TOTAL UNIT PRICE EXT. TOTAL
1
C-105 MOBILIZATION 1 LS $355,962.60 $355,962.60 $2,500,000.00 $2,500,000.00 $1,187,200.00 $1,187,200.00
2 C-100 CONTRACTOR QUALITY CONTROL PROGRAM 1 LS $25,000.00 $25,000.00 $30,000.00 $30,000.00 $66,373. 00 $66,373.00
3 C-102 CONSTRUCTION ENTRANCE 1 LS $15,229.20 $15,229.20 $14,504.00 $14,504.00 $25,904. 00 $25,904.00
4 C-102 SILT FENCE 1,320 LF $9.60 $12,672.00 * $9.14 $12,064.80 $9.00 $11,880. 00
5 C-102 TREE PROTECTION FENCING 4,660 LF $9.82 $45,761.20 * $9.35 $43,571.00 $8.00 $37,280. 00
6 C-102 CONCRETE WASHOUT 1 EA $1,428.00 $1,428.00 $1,360.00 $1,360.00 $9,423.00 $9, 423.00
7 C-102 SEEDING 1 LS $8,452.50 $8,452.50 $8,050.00 $8,050.00 $46,283.00 $4 6,283.00
8 C-102 ROCK CHECK DAMS 2 EA $1,729.35 $3,458.70 $1,647.00 $3,294.00 $2,224.00 $4, 448.00
9 C-102 INLET PROTECTION 17 EA $348.60 $5,926.20 $332.90 $5,659.30 $1,224.00 $20,80 8.00
10 C-102 TEMPORARY FENCE AROUND BIORETENTION SWALE 2,075 LF $36.75 $76,256.25 $52.00 $107,900.00 $31.00 $64,3 25.00
11 C-102 SEDIMENT TUBES 4 EA $280.35 $1,121.40 $267.00 $1,068.00 $1,483.00 $5,932. 00
12 311000 1.5" THICK ASPHALT MILLING 340 SY $87.84 $29,865.60 * $95.84 $32,585.60 $145.00 $49,30 0.00
13 311000 ASPHALT REMOVAL 5,800 SY $11.04 $64,032.00 * $10.51 $60,958.00 $16.00 $92,8 00.00
14 REP ASPHALT PAVEMENT REMOVAL-AIRSIDE, ANY THICKNESS 80 SY $57.23 $4,578.40 * $54.50 $4,360.00 $56.00 $4,480.00
15 311000 CONCRETE REMOVAL-LANDSIDE AND AIRSIDE 910 SY $53.04 $48,266.40 * $50.51 $45,964.10 $33.00 $30,030 .00
16 REP CONCRETE PAVEMENT REMOVAL-AIRSIDE, ANY THICKNESS 315 SY $33.85 $10,662.75 * $32.24 $10,155.60 $68.00 $21,420 .00
17 RPS REMOVE PIPE BOLLARD 1 EA $507.15 $507.15 $483.00 $483.00 $739.00 $739.00
18 D-701 12-INCH DIAMETER SCHEDULE 80 PVC STORM DRAIN-AIRSIDE 465 LF $150.65 $70,052.25 * $143.48 $66,718.20 $279.00 $129 ,735.00
19 D-701 STORM DRAIN CLEANOUT IN PAVEMENT AND GRASS AREAS 3 EA $2,286.90 $6,860.70 $2,178.00 $6,534.00 $3,297.00 $9, 891.00
20 D-701 6-INCH DIAMETER SCHEDULE 80 PVC STORM DRAIN-AIRSIDE 150 LF $61.62 $9,243.00 * $58.69 $8,803.50 $198.00 $29,700. 00
21 D-701 4-INCH DIAMETER SCHEDULE 80 PVC STORM DRAIN-AIRSIDE 50 LF $61.64 $3,082.00 * $58.70 $2,935.00 $115.00 $5,750.00
22 D-751 STORM DRAINAGE MANHOLE 1 EA $7,324.80 $7,324.80 $6,976.00 $6,976.00 $10,543.00 $1 0,543.00
23 F-162 TEMPORARY SIDA FENCE 1,955 LF $47.25 $92,373.75 $52.00 $101,660.00 $28.00 $54,7 40.00
24 F-162 TEMPORARY CONSTRUCTION FENCE 615 LF $42.00 $25,830.00 $34.00 $20,910.00 $29.00 $17,835. 00
25 F-162 TEMPORARY 24-FOOT WIDE MANUAL DOUBLE SWING GATE 2 EA $2,100.00 $4,200.00 $2,400.00 $4,800.00 $19,583.00 $3 9,166.00
26 F-162 REMOVE CHAIN LINK FENCE, ANY HEIGHT 510 LF $4.20 $2,142.00 $10.00 $5,100.00 $11.00 $5,610.00
27 F-162
REMOVE CHAIN LINK SLIDING GATE AND ALL RELATED
APPURTENANCES, ANY SIZE 1 EA $1,575.00 $1,575.00 $2,800.00 $2,800.00 $3,874.00 $3, 874.00
28 F-162
NEW 8-FT CHAIN LINK FENCE WITH 3 STRANDS BARBED WIRE-BLACK
COATED 325 LF $47.25 $15,356.25 $62.00 $20,150.00 $121.00 $39,325 .00
29 P-620
PAVEMENT MARKING REMOVAL-AIRSIDE--ANY COLOR ON ANY
PAVEMENT 4,510 SF $7.00 $31,570.00 * $6.67 $30,081.70 $7.00 $31,570. 00
30 P-620 PAVEMENT MARKING-REFLECTORIZED WHITE 625 SF $6.58 $4,112.50 * $6.27 $3,918.75 $9.00 $5,625.00
31 P-620 PAVEMENT MARKING-NON-REFLECTORIZED WHITE 1,360 SF $5.70 $7,752.00 * $5.43 $7,384.80 $5.00 $6,800.00
32 P-620 PAVEMENT MARKING-REFLECTORIZED YELLOW 1,180 SF $5.92 $6,985.60 * $5.64 $6,655.20 $9.00 $10,620.00
33 P-620 PAVEMENT MARKING-NON-REFLECTORIZED YELLOW 40 SF $9.03 $361.20 $8.60 $344.00 $6.00 $240.00
34 P-620 PAVEMENT MARKING-REFLECTORIZED RED 1,200 SF $5.80 $6,960.00 * $5.52 $6,624.00 $9.00 $10,800.00
35 P-620 PAVEMENT MARKING-NON REFLECTORIZED RED 65 SF $7.46 $484.90 * $7.10 $461.50 $7.00 $455.00
36 P-620 PAVEMENT MARKING-BLACK 4,080 SF $4.71 $19,216.80 * $4.49 $18,319.20 $6.00 $24,480. 00
37 311000 WATERLINE DEMOLITION & REMOVAL 580 LF $17.66 $10,242.80 * $16.82 $9,755.60 $69.00 $40,020. 00
38 311000 MISC. DEMOLITION 1 LS $23,679.60 $23,679.60 $22,552.00 $22,552.00 $71,731. 00 $71,731.00
39 311000 TREE REMOVAL 132 EA $1,755.60 $231,739.20 $1,672.64 $220,788.48 $2,648 .00 $349,536.00
40 312323 CONDUIT REMOVAL 1 LS $5,250.00 $5,250.00 $20,000.00 $20,000.00 $10,263.00 $10,263.00
41 P-152 EMBANKMENT IN PLACE-IMPORT FILL-AIRSIDE 1,550 CY $43.10 $66,805.00 * $41.05 $63,627.50 $127.00 $196 ,850.00
42 P-152 UNSUIITABLE EXCAVATION-AIRSIDE 500 CY $34.80 $17,400.00 * $33.14 $16,570.00 $80.00 $40,000 .00
43 312000 STRIPPING TOPSOIL 1,430 CY $41.13 $58,815.90 * $39.17 $56,013.10 $29.00 $41,4 70.00
44 312000 CUT TO FILL-LANDSIDE 900 CY $14.97 $13,473.00 * $14.26 $12,834.00 $105.00 $94,50 0.00
45 312000 IMPORT FILL MATERIAL 5,100 CY $43.10 $219,810.00 * $41.05 $209,355.00 $127.00 $6 47,700.00
46 312000 MUCK & FILL 1,100 CY $60.26 $66,286.00 * $57.39 $63,129.00 $211.00 $232 ,100.00
47 312000 FINE GRADING 15,600 SY $11.63 $181,428.00 * $11.08 $172,848.00 $3.00 $46 ,800.00
48 334000 STORM DRAIN GRATE INLET 4 EA $5,967.15 $23,868.60 $5,683.00 $22,732.00 $10,430.00 $41,720.00
49 334000 STORM DRAIN BUBBLER BOX 12 EA $7,621.64 $91,459.68 * $7,258.70 $87,104.40 $12,161. 00 $145,932.00
50 334000 YARD INLET WITH DOMED GRATE 9 EA $4,588.50 $41,296.50 $4,370.00 $39,330.00 $11,740.00 $105,660.00
51 334000 RIP RAP OVER FILTER FABRIC 160 SY $169.25 $27,080.00 * $161.19 $25,790.40 $121.00 $19, 360.00
52 334000 15" RCP 198 LF $76.91 $15,228.18 * $73.25 $14,503.50 $125.00 $24,75 0.00
53 334000 18" RCP 355 LF $92.05 $32,677.75 * $87.67 $31,122.85 $198.00 $70,29 0.00
54 334000 CONCRETE FLUMES 5 EA $3,472.02 $17,360.10 * $3,818.00 $19,090.00 $4,863.00 $24,315.00
55 334000 12" PERFORATED UNDERDRAIN WITH STONE TRENCH 401 LF $137.24 $55,033.24 * $130.70 $52,410.70 $192.00 $76, 992.00
56 334000 CORE EXISTING OUTLET BOX FOR UNDERDRAIN CONNECTION 1 EA $4,060.35 $4,060.35 $3,867.00 $3,867.00 $2,737.00 $2, 737.00
57 334000 ROOF DRAINAGE COLLECTION SYSTEM 1 LS $266,332.50 $266,332.50 $253,650.00 $253,650.00 $292 ,173.00 $292,173.00
58 334000 BIORETENTION/BIOSWALE SOIL MEDIA CONSTRUCTION 415 CY $302.90 $125,703.50 * $288.48 $119,719.20 $261.00 $1 08,315.00
59 321216 2" ASPHALT SURFACE COURSE-LANDSIDE 4,200 SY $54.20 $227,640.00 * $59.57 $250,194.00 $90.00 $37 8,000.00
60 321123 8" AGGREGATE BASE COURSE-LANDSIDE 4,200 SY $50.65 $212,730.00 * $50.02 $210,084.00 $78.00 $32 7,600.00
61 321123 TACK COAT-LANDSIDE 300 GAL $33.64 $10,092.00 * $29.58 $8,874.00 $57.00 $17,100 .00
62 321313 CONCRETE CURB-LANDSIDE 1,530 LF $43.69 $66,845.70 * $41.61 $63,663.30 $57.00 $87,2 10.00
63 321313 CONCRETE PAVERS-LANDSIDE 510 LF $211.81 $108,023.10 * $201.72 $102,877.20 $888.00 $4 52,880.00
64 P-501 6-INCH THICK PORTLAND CEMENT CONCRETE PAVEMENT 1,285 SY $227.82 $292,748.70 * $255.02 $327,700.70 $402.00 $516,570.00
65 P-501
6-INCH THICK PORTLAND CEMENT CONCRETE PAVEMENT
(REINFORCED) 535 SY $237.72 $127,180.20 $265.44 $142,010.40 $416.00 $22 2,560.00
66 P-501 8-INCH THICK PORTLAND CEMENT CONCRETE PAVEMENT 110 SY $281.53 $30,968.30 * $313.19 $34,450.90 $493.00 $54, 230.00
67 P-501
8-INCH THICK PORTLAND CEMENT CONCRETE PAVEMENT
(REINFORCED) 25 SY $327.82 $8,195.50 * $362.50 $9,062.50 $574.00 $14,350 .00
68 P-403 BITUMINOUS BASE COURSE 835 TON $561.93 $469,211.55 * $613.02 $511,871.70 $923.00 $ 770,705.00
69 P-603 BITUMINOUS TACK 300 GAL $14.95 $4,485.00 * $15.12 $4,536.00 $25.00 $7,500.0 0
70 321313 4" CONCRETE SIDEWALK-LANDSIDE 841 SY $92.18 $77,523.38 * $103.08 $86,690.28 $162.00 $136, 242.00
71 321313 4" CONCRETE SIDEWALK-AIRSIDE 125 SY $92.18 $11,522.50 * $102.64 $12,830.00 $162.00 $20,2 50.00
72 321313 4" CONCRETE PAD FOR BIKE RACKS 20 SY $173.60 $3,472.00 * $195.50 $3,910.00 $305.00 $6,100. 00
73 321313 4" OYSTER SHELL CONCRETE WALKWAY 510 SY $114.29 $58,287.90 * $127.99 $65,274.90 $201.00 $102 ,510.00
74 321313 INTERNALLY PIGMENTED CONCRETE CROSSWALKS 475 SY $364.56 $173,166.00 $251.97 $119,685.75 $351.00 $16 6,725.00
75 321313 CONCRETE WHEELSTOP 55 EA $144.90 $7,969.50 $138.00 $7,590.00 $437.00 $24,035. 00
76 321313 HANDICAP RAMPS WITH DETECTABLE WARNINGS 1 LS $28,933.54 $28,933.54 $32,430.00 $32,430.00 $50,641. 00 $50,641.00
77 321313 6" CONCRETE DUMPSTER PAD 85 SY $231.47 $19,674.95 * $262.50 $22,312.50 $405.00 $34,4 25.00
78 321313 WOOD DUMPSTER ENCLOSURE 1 EA $144.90 $144.90 $20,000.00 $20,000.00 $12,828.00 $12, 828.00
79 321313 STRIPING, SIGNAGE, & MARKING 1 LS $22,641.15 $22,641.15 $21,563.00 $21,563.00 $59,865. 00 $59,865.00
80 331100 TIE-IN TO EXISTING WATERLINE 1 LS $17,947.65 $17,947.65 $17,093.00 $17,093.00 $138,860 .00 $138,860.00
81 331100 10" PVC WATER LINE 640 LF $88.81 $56,838.40 * $84.58 $54,131.20 $252.00 $161,2 80.00
82 331100 6" PVC WATER LINE 6 LF $39.90 $239.40 $38.00 $228.00 $273.00 $1,638.00
83 331100 6" PVC FIRE LINE 255 LF $43.18 $11,010.90 * $41.12 $10,485.60 $150.00 $38,25 0.00
84 331100 FREE-STANDING FDC 1 EA $16,842.00 $16,842.00 $16,040.00 $16,040.00 $7,730.0 0 $7,730.00
85 331100 2" WATER LATERAL 70 LF $21.95 $1,536.50 * $20.90 $1,463.00 $122.00 $8,540.00
86 331100 2.5" WATER LATERAL 22 LF $28.56 $628.32 $27.20 $598.40 $133.00 $2,926.00
87 331100 FIRE HYDRANTS 1 EA $9,028.92 $9,028.92 * $8,599.00 $8,599.00 $21,972.00 $ 21,972.00
88 331100 VALVES, FITTINGS, & RPZS 1 LS $85,335.60 $85,335.60 $81,272.00 $81,272.00 $360,818 .00 $360,818.00
89 331100 WATER TESTING 1 LS $15,252.30 $15,252.30 $14,526.00 $14,526.00 $57,137. 00 $57,137.00
90 333100 CONNECT TO EXISTING SEWER MANHOLE 1 EA $10,285.80 $10,285.80 $9,796.00 $9,796.00 $7,352.00 $ 7,352.00
91 333100 STANDARD MANHOLE 3 EA $6,197.10 $18,591.30 $5,902.00 $17,706.00 $10,833.00 $32,499.00
92 333100 8" SEWER LINE 386 LF $79.61 $30,729.46 * $75.82 $29,266.52 $182.00 $70,25 2.00
93 333100 6" SEWER LATERAL WITH CLEANOUTS 100 LF $80.23 $8,023.00 * $76.41 $7,641.00 $618.00 $61,800. 00
94 333100 SEWER TESTING 1 LS $5,909.40 $5,909.40 $5,628.00 $5,628.00 $55,215.00 $5 5,215.00
95 L-110 2-INCH DIAMETER SCHEDULE 80 PVC CONDUIT 2,700 LF $46.87 $126,549.00 * $44.64 $120,528.00 $49.00 $13 2,300.00
96 L-110 2-INCH DIAMETER SCHEDULE 80 PVC CONDUIT DIRECTIONAL BORE 75 LF $99.23 $7,442.25 * $94.50 $7,087.50 $188.00 $14,100.0 0
Edison Foard, Inc.
Charlotte, NC
Monteith Construction Corp.
Wilmington, NC
Cooper Tacia General Contracting Co.
Raleigh, NC
LICENSE NO.: BD5 122012 LICENSE NO.: CLG.99696 LICENSE NO.: BD5 G11049
46
Item 11.
BID TABULATION
TERMINAL IMPROVEMENTS-PHASE 1-IFB# 041923
HILTON HEAD ISLAND AIRPORT
TBE PROJECT NO. 2119-1905
JUNE 7, 2023
BASE BID
ITEM SPEC
NO. NO. DESCRIPTION QTY UNIT UNIT PRICE EXT. TOTAL UNIT PR ICE EXT. TOTAL UNIT PRICE EXT. TOTAL
Edison Foard, Inc.
Charlotte, NC
Monteith Construction Corp.
Wilmington, NC
Cooper Tacia General Contracting Co.
Raleigh, NC
LICENSE NO.: BD5 122012 LICENSE NO.: CLG.99696 LICENSE NO.: BD5 G11049
97 SPEC. HANDHOLE 3 EA $1,899.45 $5,698.35 $1,809.00 $5,427.00 $6,239.00 $18 ,717.00
98
CONTRACT
DOCUMENTS
TERMINAL RENOVATION AND EXPANSION AS DEPICTED IN THE
CONTRACT DOCUMENTS TO INCLUDE ALL CONTRACT ITEMS NOT
INDICATED ELSEWHERE ON THE BID FORM 1 LS $21,642,000.00 $21,642,000.00 $20,339,012.00 $20,33 9,012.00 $26,386,000.00 $26,386,000.00
99 12100 GATE 1 COUNTER INSERTS (ALLOWANCE NO. 1) 1 ALLOW $7,000.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00
100 12100 GATE 2 COUNTER INSERTS (ALLOWANCE NO. 2) 1 ALLOW $7,000.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00
101 12100 TEMPORARY SIGNAGE (ALLOWANCE NO. 3) 1 ALLOW $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,0 00.00 $10,000.00
102 12100
PLAN REVIEW, BUILDING PERMIT, UTILITY TAP AND MISC. FEES
(ALLOWANCE NO. 4) 1 ALLOW $125,000.00 $125,000.00 $125,000.00 $125,000.00 $ 125,000.00 $125,000.00
103 12100
SOIL TESTING FOR PERCOLATION RATES AND COMPOSITION
ADJUSTMENT (ALLOWANCE NO. 5) 1 ALLOW $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,0 00.00 $10,000.00
104 12100 COST TO MOVE TSA AND LEO OFFICES (ALLOWANCE NO. 6) 1 ALLOW $200,000.00 $200,000.00 $200,000.00 $200,000.00 $ 200,000.00 $200,000.00
105 SPEC FINE GRADING-LANDSCAPING 1 LS $3,150.00 $3,150.00 $670.47 $670.47 $742.00 $742.00
106 SPEC SOIL AMENDMENTS-LANDSCAPING 1 LS $682.50 $682.50 $15,085.71 $15,085.71 $15,991.00 $15, 991.00
107 SPEC HERBICIDE 1 LS $367.50 $367.50 $470.51 $470.51 $530.00 $530.00
108 SPEC
LANDSCAPING WITH REQUIRED IRRIGATION SYSTEM COMPLETE PER
PLAN 1 LS $69,823.37 $69,823.37 $108,196.38 $108,196.38 $114,6 89.00 $114,689.00
109 SPEC SOD, ZOYSIA JAPONICA `ZEON`, KOREAN GRASS 8,000 SF $1.21 $9,680.00 * $1.95 $15,600.00 $3.00 $24,000.0 0
110 SPEC PHASE 1 - YEAR 1 MAINTENANCE 1 LS $2,100.00 $2,100.00 $19,620.00 $19,620.00 $20,798.00 $20,798.00
111 SPEC PHASE 1 - YEAR 2 MAINTENANCE 1 LS $2,100.00 $2,100.00 $20,304.00 $20,304.00 $21,523.00 $21,523.00
112 SPEC PHASE 1 - YEAR 3 MAINTENANCE 1 LS $2,100.00 $2,100.00 $21,024.00 $21,024.00 $22,286.00 $22,286.00
113 SPEC PHASE 2 - YEAR 1 MAINTENANCE 1 LS $0.00 $0.00 $3,840.00 $3,840.00 $4,071.00 $4,071.00
114 SPEC PHASE 2 - YEAR 2 MAINTENANCE 1 LS $0.00 $0.00 $3,984.00 $3,984.00 $4,224.00 $4,224.00
115 SPEC PHASE 2 - YEAR 3 MAINTENANCE 1 LS $0.00 $0.00 $5,400.00 $5,400.00 $5,724.00 $5,724.00
116 SPEC PHASE 6 - YEAR 1 MAINTENANCE 1 LS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
117 SPEC PHASE 6 - YEAR 2 MAINTENANCE 1 LS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
118 SPEC PHASE 6 - YEAR 3 MAINTENANCE 1 LS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
119 371APD REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER COVER 1 EA $2,940.00 $2,940.00 $3,534.00 $3,534.00 $3,747.00 $3, 747.00
120 SPEC
5-LUMINAIRE LED APRON FLOODLIGHT POLE WITH 50-FT MOUNTING
HEIGHT, COMPLETE 2 EA $40,000.00 $80,000.00 $42,000.00 $84,000.00 $36,860. 00 $73,720.00
121 SPEC REINFORCED CONCRETE TRANSFORMER PAD 1 EA $10,678.50 $10,678.50 $10,000.00 $10,000.00 $4,293.0 0 $4,293.00
122 SPEC REINFORCED CONCRETE GENERATOR PAD 1 EA $3,150.00 $3,150.00 $17,500.00 $17,500.00 $16,505.00 $16,505.00
TOTAL BASE BID AMOUNT $27,196,809.29 * $28,232,314.40 $ 36,530,153.00
DBE SUBCONTRACTOR AMOUNT $1,515,000.00 $1,530,000.00 $0.00
DBE PERCENTAGE OF BASE BID AMOUNT 5.6% 5.4% 0.0%
* DENOTES MATH ERROR
I HEREBY CERTIFY THIS TABULATION OF BIDS TO BE CORRECT.
6/8/2023
TALBER, BRIGHT & ELLINGTON, INC. DATE
47
Item 11.
BID TABULATION
TERMINAL IMPROVEMENTS-PHASE 1-IFB# 041923
HILTON HEAD ISLAND AIRPORT
TBE PROJECT NO. 2119-1905
JUNE 7, 2023
ADD ALTERNATE BID
ITEM SPEC
NO. NO. DESCRIPTION QTY UNIT UNIT PRICE EXT. TOTAL UNIT PR ICE EXT. TOTAL UNIT PRICE EXT. TOTAL
1 347713
BID ALTERNATE NO. 1A - GATE 1 AIRCRAFT GATE EQUIPMENT TO
INCLUDE 2A $35,000 SPARE PARTS ALLOWANCE 1 LS $1,402,000.00 $1,402,000.00 $1,432,000.00 $1,432,00 0.00 $1,399,836.00 $1,399,836.00
2 347713
BID ALTERNATE NO. 1B - GATE 2 AIRCRAFT GATE EQUIPMENT TO
INCLUDE 2A $35,000 SPARE PARTS ALLOWANCE 1 LS $1,414,000.00 $1,414,000.00 $1,409,000.00 $1,409,00 0.00 $1,378,000.00 $1,378,000.00
3 347713
BID ALTERNATE NO. 1C - GATE 3 AIRCRAFT GATE EQUIPMENT TO
INCLUDE 2A $35,000 SPARE PARTS ALLOWANCE 1 LS $1,502,000.00 $1,502,000.00 $1,528,000.00 $1,528,00 0.00 $1,505,200.00 $1,505,200.00
4
CONTRACT
DOCUMENTS BID ALTERNATE NO. 2 - FURNITURE ALLOWANCE 1 ALLOW $300,000.00 $300,000.00 $300,000.00 $300,000.00 $ 300,000.00 $300,000.00
5
CONTRACT
DOCUMENTS BID ALTERNATE NO. 3 - ALTERNATE CANOPY ENTRANCE 1 LS $1,121,000.00 $1,121,000.00 $864,000.00 $864,000.00 $1,645,000.00 $1,645,000.00
6 12300 BID ALTERNATE NO. 4 - FOUNDATION DRAINAGE 1 LS $231,000.00 $231,000.00 $248,000.00 $248,000.00 $86, 920.00 $86,920.00
7 EB-44
BID ALTERNATE NO. 5 - SEAL/REJUVENATE EXISTING ASPHALT PARKING
PAVEMENT TO REMAIN AFTER DEMOLITION-LANDSIDE 8,200 SY $3.76 $30,832.00 $4.58 $37,556.00 $22.00 $180,400 .00
8 321313
BID ALTERNATE NO. 6 - NON-REFLECTORIZED WHITE PAVEMENT
MARKING OF EXISTING PARKING SPACES TO REMAIN IN EXISTING
ASPHALT PARKING PAVEMENT AFTER SEALING/REJUVENATING-
LANDSIDE 950 SF $4.83 $4,588.50 $6.00 $5,700.00 $32.00 $30,400.00
9 321313 BID ALTERNATE NO. 7 - HOLDROOM UPFIT 1 LS $469,000.00 $469,000.00 $390,000.00 $390,000.00 $800 ,000.00 $800,000.00
10 321313 BID ALTERNATE NO. 8 - SECOND MANNED CHECKPOINT LANE 1 LS $106,000.00 $106,000.00 $127,000.00 $127,000.00 $120 ,840.00 $120,840.00
11 321313
BID ALTERNATE NO. 9 - GATE COUNTER INSERTS TO INCLUDE $7,000
ALLOWANCE 1 LS $7,000.00 $7,000.00 $16,500.00 $16,500.00 $7,000.00 $ 7,000.00
12 SPEC
BID ALTERNATE NO. 10 - 1-LUMINAIRE LED APRON FLOODLIGHT POLE
WITH 45-FT MOUNTING HEIGHT, COMPLETE 1 EA $76,000.00 $76,000.00 $105,000.00 $105,000.00 $27,56 0.00 $27,560.00
13 SPEC
BID ALTERNATE NO. 11 - 2-LUMINAIRE LED APRON FLOODLIGHT POLE
WITH 45-FT MOUNTING HEIGHT, COMPLETE 1 EA $76,000.00 $76,000.00 $115,000.00 $115,000.00 $27,56 0.00 $27,560.00
14 SPEC
BID ALTERNATE NO. 12 - 3-LUMINAIRE LED APRON FLOODLIGHT POLE
WITH 35-FT MOUNTING HEIGHT, COMPLETE 1 EA $76,000.00 $76,000.00 $95,000.00 $95,000.00 $13,780. 00 $13,780.00
15 SPEC
BID ALTERNATE NO. 13 - 2-LUMINAIRE LED APRON FLOODLIGHT POLE
WITH 35-FT MOUNTING HEIGHT, COMPLETE 1 EA $76,000.00 $76,000.00 $91,625.00 $91,625.00 $13,780. 00 $13,780.00
DEDUCT ALTERNATE BID
ITEM SPEC
NO. NO. DESCRIPTION QTY UNIT UNIT PRICE EXT. TOTAL UNIT PR ICE EXT. TOTAL UNIT PRICE EXT. TOTAL
1 321313 BID ALTERNATE NO. 14 - DELETE HOLDROOM SHELL 1 LS ($376,000.00) ($376,000.00) ($700,000.00) ($700,000 .00) ($675,000.00) ($675,000.00)
* DENOTES MATH ERROR
LICENSE NO.: BD5 122012 LICENSE NO.: BD5 G11049 LICENSE NO.: CLG.99696
Edison Foard, Inc. Monteith Construction Corp.
Charlotte, NC Wilmington, NC
Cooper Tacia General Contracting Co.
Raleigh, NC
48
Item 11.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommend Approval of Beaufort Executive Airport (ARW) facility use rate changes
MEETING NAME AND DATE:
Public Facilities and Safety Committee; August 28, 2023
PRESENTER INFORMATION:
Jon Rembold; Airports Director
3 minutes
ITEM BACKGROUND:
Beaufort Executive Airport’s Facility Use Fees have not been significantly increased in over 10 years.
In June, 2023, the Airports Board’s ARW Committee recommended the fee increase described in this package.
At its regular meeting on July 20, 2023, the Airports Board voted in favor of the fee structure proposed in this
package. Pursuant to Section 6-65 of the Beaufort County Code of Ordinances, with approval of the aviation
board, the Airports Director is authorized to establish these fees.
PROJECT / ITEM NARRATIVE:
Beaufort Executive Airport charges Facility Use Fees to customers as a method of self-funding airport
operations and maintenance. These fees have been consistently lower than comparative airports and have
not increased significantly in several years. Maintenance and replacement costs continue to increase as the
facility ages, prompting this fee increase. The airport endeavors to operate as financially self-sufficiently as
possible to comply with FAA Sponsor Assurances and County policy regarding enterprise funds.
FISCAL IMPACT:
Fee FY23 FY24
Ramp Fee (Large aircraft only) $150.00 $150.00
Tie-down (Lg,Daily,Transient) $20.00 $50.00
Tie-down (Lg,Monthly,Tenant) $150.00 $200.00
Tie-down (Sm,Daily,Transient) $10.00 $20.00
Tie-down (Sm,Monthly,Tenant) $100.00 $150.00
Associated Airport Revenue $71,434.00 $100,000.00(estimated)
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval of the facility use rate changes at Beaufort Executive Airport (ARW)
OPTIONS FOR COUNCIL MOTION:
Motion to approve /deny the recommended approval of Beaufort Executive Airport (ARW) facility use
rate changes
Move forward to Council for Approval on September 11, 2023
49
Item 12.
RESOLUTION 2023/_____
A RESOLUTION BY THE BEAUFORT COUNTY COUNCIL AUTHORIZING THE BEAUFORT
EXECUTIVE AIRPORT FACILITY USE RATE CHANGES
WHEREAS, the Beaufort Executive Airport desires to become as financially self -sufficient as
feasible; and
WHEREAS, a n informal regional comparative rate analysis was conducted by Airports Board
members, which showed existing rates at Beaufort Executive Airport are comparatively low; and
WHEREAS, the facility use rates at Beaufort Executive Airport have not been significantly
increased in a decade; and
WHEREAS, the maintenance costs of the airport continue to increase as the age of the airport
increases and said maintenance cannot be deferred; and
WHEREAS, Council has determined that the rate changes outlined in the table shown below are
in the best interest of its citizens and will assist the airport in maintaining a safe and efficient facility.
Fee FY23 FY24
Ramp Fee (Large aircraft only) $150.00 $150.00
Tie-down (Lg,Daily,Transient) $20.00 $50.00
Tie-down (Lg,Monthly,Tenant) $150.00 $200.00
Tie-down (Sm,Daily,Transient) $10.00 $20.00
Tie-down (Sm,Monthly,Tenant) $100.00 $150.00
Associated Airport Revenue $71,434.00 $100,000.00 Estimated
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly assembled, does
hereby authorize the Beaufort Executive Airport to implement the new facility use rates.
Adopted this ____ day of __________, 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Joseph Passiment, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
50
Item 12.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation to approve an Interim Letter of Agreement for Shuttle Service between Beaufort County
and The Best of Hilton Head
MEETING NAME AND DATE:
Public Facilities and Safety Committee; August 28, 2023
PRESENTER INFORMATION:
Jon Rembold; Airports Director
3 minutes
ITEM BACKGROUND:
The Airports Board reviewed and recommended approval of the agreement at its monthly meeting held
August 17, 2023.
PROJECT / ITEM NARRATIVE:
The Best of Hilton Head will operate a shuttle service to/from Hilton Head Island Airport, to pick up and
deliver passengers and their baggage between Hilton Head Island and vicinity. There is not a shuttle policy in
place, so this interim letter of agreement will serve as the interim shuttle policy. It will be in place on a trial
basis and can be modified as the Airport deems appropriate.
Shuttle vehicles will be tracked via a geo-fence and will submit a detailed monthly report showing number of
trips and passengers with their monthly payment to the Airport.
FISCAL IMPACT:
Hilton Head Island Airport will receive a monthly fee of $1.00 per passenger with a minimum fee of $5.00
each time a shuttle vehicle enters Airport property.
STAFF RECOMMENDATIONS TO COMMITTEE:
Staff recommends approval of the Interim Letter of Agreement between Beaufort County and The Best
of Hilton Head.
OPTIONS FOR COMMITTEE MOTION:
Motion to approve/deny an Interim Letter of Agreement between Beaufort County and The Best of
Hilton Head .
Move forward to Council for Approval on September 11, 2023
51
Item 13.
INTERIM LETTER OF AGREEMENT
FOR SHUTTLE SERVICE
Whereas, Beaufort County desires to obtain and make available adequate ground transportation
services to and from Hilton Head Island Airport to accommodate passengers desiring ground
transportation services. Therefore, and in consideration of the covenants and agreements herein
specified, including the payment of fees, Beaufort County and The Best of Hilton Head agree as
follows:
1. PRIMARY SERVICE
Operator shall have the non-exclusive right and privilege to operate a shuttle service
to/from Hilton Head Island Airport, Hilton Head Island, South Carolina, as provided for in
Operator’s Public Service Commission Permits and to pick up and deliver passengers and
their baggage between Hilton Head Island and vicinity.
2. FACILITIES ASSIGNED TO THE OPERATOR
Customer loading/unloading area in designated Shuttle Parking area. (Subject to change
by the Airports Director). No other location on Airport property shall be used for any
business or commercial purpose, directly or indirectly, by shuttle operators.
Operator agrees that it will not, in the conduct of its business, unreasonably interfere with
the general flow of traffic in and around the terminal, or any other facility, and that it will
expeditiously and efficiently conduct its business of transporting passengers, baggage,
and other personal property to and from said terminal.
3. FEES
Operators entering into this Agreement agree to pay a monthly fee of $1.00 per
passenger with a minimum fee of $5.00 each time entering Airport property. Twenty (20)
days after the beginning of each calendar month during the term hereof, Shuttle
Operator shall furnish to County an accounting of the previous month's GEO Fence
Report along with payment for the appropriate sum of money as computed in
accordance with this subsection.
First Vehicle:
• Vehicle VIN# ____________________________________
• Make/Model ___________________________________
• Vehicle Capacity ______
• License Plate ________
52
Item 13.
Payment address:
Hilton Head Island Airport
Attn: Administration
120 Beach City Road
Hilton Head Island, SC 29926
The County reserves the right to limit the number of Shuttle vehicles that logistically can
be handled within the airport terminal campus and still provide the traveling public with
adequate service.
4. PUBLIC SERVICE
In entering into this Agreement, the County has foremost in mind providing the public
and the air traveler with high quality ground transportation facilities and service.
Accordingly, the Operator agrees to conduct its business at all times in a professio nal
manner. All facilities, services, and standards of operation shall be at least equal to the
highest quality of service rendered by shuttle companies of like nature at other modern
terminal facilities. The general public shall be given the highest consideration at all times
in matters affecting the operation of this shuttle service.
5. SHUTTLE EQUIPMENT
A) Operator agrees to provide vehicles with the capacity for a m aximum of fifteen (15)
passengers and baggage.
All shuttles shall have an operable air conditioner and heater of adequate capacity for
each vehicle. Interior appointments shall be attractive, neat, clean and in good repair.
All shuttles shall be marked uniformly on the outside with the company name/logo.
B) An Operator entering into this Agreement with the County agrees that it shall not
place into service any vehicle which is more than six (6) model years old.
C) Operator agrees to maintain all vehicles in accordance with South Carolina Highway
Safety Department Inspection Standards.
D) Operator also agrees to maintain all interiors and exteriors in excellent condition.
Dents, scratches and rust shall be promptly repaired and/or repainted.
E) Operator shall furnish the County, with this Agreement, a detailed listing of the motor
vehicles it proposes to operate in the shuttle service. The listing shall include the year
of manufacture, vehicle identification number, capacity, and general description of
53
Item 13.
each vehicle. Operator shall promptly notify the Airport Director in writing of any
additions or d eletions of motor vehicles to or from service. At no time shall the
Operator operate any vehicle on the Airport that is not on said listing of vehicles. Prior
approval from the Airport Director is required before the Operator operates any
vehicle which i s not on said listing of vehicles on the Airport. All vehicles shall be
insured as required in paragraph 11 of this Agreement.
F) The County reserves the right to deny the use of any vehicle supplied by the Operator
for public use on the Airport. Notice of such denial shall be submitted to the Operator
by the Airport Director or designee in writing with the reasons therefore, and
Operator shall immediately withdraw such unsatisfactory vehicles from service on the
Airport.
6. PERSONNEL
All drivers shall be emplo yees or agents of the Operator and shall be fully competent,
experienced, and properly licensed as required by the State of South Carolina , Beaufort
County, and the Town of Hilton Head Island. All drivers must obey all traffic laws and
regulations while operating the shuttle.
All drivers will at all times be under the direction of the Operator, who will be solely
responsible for their conduct and performance. Drivers shall conduct themselves with
courtesy and dignity and with the public interest of primary importance.
The Operator shall be held fully responsible for the conduct of all persons in his employ
and shall maintain a close check over all employees to insure the maintenance of a high
standard of service to the public. No employee shall behave in or about the Airport’s
premises in a loud, boisterous, offensive, or otherwise improper manner.
Operator’s employees shall be neat, clean, properly attired, and present a professional
appearance.
The Operator shall be required to remove from service any employee whose conduct the
County or Airport Director feels is detrimental to the best interest of the Airport.
7. PERMITS AND LICENSES
Operator agrees to conduct its business in accordance with all Federal, State, County, and
Town of Hilton Head Island laws and shall obtain and maintain all required licenses and
permits. Any change to operating license, permits etc. will require a new permit.
8. HOLD HARMLESS AND INSURANCE
It is expressly understood and agreed that Operator is and shall be responsible to all
parties for all acts or omissions of their drivers, and Beaufort County and its officers and
employees shall in no way be responsible for their acts or omissions. Operator agrees to
fully indemnify and hold harmless Beaufort County and its officers and employees from
and against all claims and actions and all expenses incidental to the investigation and
54
Item 13.
defense thereof based upon or arising out of damages or injuries to person or property
caused by the fault or negligence of Operator, its agents, or employees, arising out of the
conduct of Operator or its agents or employees, or arising out of the use or occupancy of
Airport buildings or property by Operator, its agents or employees or assume, without
expenses to Beaufort County, its officers or employees, the defense of any such claims or
actions. Beaufort County shall give to Operator prompt and reasonable notice of any
such claims or actions or suits by certified mail.
The Operator shall carry public liability and property damage insur ance in the minimum
amounts and sums as follows:
Public Liability: $100,000 each person $300,000 each occurrence
Property Damage: $50,000 each occurrence
A) In all insurance policies carried by the Operator under the terms of this Agreement,
Beaufort County, its officers, agents, and employees will be named as additional insured
with a provision that the County must receive thirty (30) days notice in writing prior to
the cancellation of such insurance. Cancellation of an insurance policy required pursuant
to this Agreement is cause for termination until the required insurance is reinstated by an
acceptable policy.
B) The Operator shall furnish to the County all required Certificates of Insurance before
beginning operations under this Agreement. Such Certificates shall also be accompanied
by a statement from each insurance company stating that said company is authorized and
properly licensed to do business in the State of South Carolina and the Tow n of Hilton
Head Island.
9. RULES AND REGULATIONS
Operator agrees that he and his agents and employees will comply with the rules and
regulations of Beaufort County and all directives, memoranda, and policies as
promulgated from time to time by the County or Airports Director (See Shuttle Rules
attached).
10. REPAIRS AND MODIFICATIONS
Operator shall repair promptly and at no cost to the County any damages to property on
Hilton Head Island Airport which have been attributed to or caused by the Operator, his
employees, agents, or representatives.
11. TERM
The term of this agreement shall commence on the date signed by the County
Administrator and shall end on June 30, 2024.
55
Item 13.
12. COUNTY’S RIGHT TO CANCELLATION
The county will have the right to terminate this Agreement i n its entirety immediately
upon the happening of any of the following events:
A) The filing by or against the Operator of any petition of bankruptcy, whether voluntary or
involuntary.
B) The making by the Operator of an agreement for the benefit of creditors shall constitute
a breach of the concession agreement, and thereupon the Agreement shall become null
and void, and no benefits thereunder shall pass to any assignee to or transfer thereof.
C) The abandonment or discontinuance of the operations and services by the Operator.
D) The failure of the Operator to keep required insurance in force.
E) The non-payment of any fees and rents due the County continuing for seven (7) days from
the date written notice has been sent to the operator by the County/Airport Director.
F) The presentation to the County of any checks by the Operator that are returned for
insufficient funds.
G) Two or more complaints are received concerning cleanliness of equipment, b ehavior of
Operator or his employees, or inadequate performance and these complaints have been
substantiated by proper authority.
H) The failure to procure insurance in the amount required or cancellation of insurance
required under section 11.
I) The failure of the Operator to perform, keep or observe any other of the terms,
covenants, and conditions of the Agreement, except those specifically listed above,
required on the part of the Operator to be performed, kept, or observed after the
expiration of ten (10) days from the date written notice has been given to the Operator
by the County/Airport Director to correct such default or breach.
13. OPERATOR’S RIGHT TO CANCELLATION
The Operator shall have the right, upon thirty (30) days written notice to the County, to
terminate the Agreement at any time after the occurrence of one or more of the following
events:
A) The assumption by the United States Government and the authorized agencies thereof or
any other governmental agency of the operation, control or use of the Airport facilities or
any substantial part or parts thereof in such a manner as to substantially restrict for a
period of thirty (30) days or more the conduct of the Operator’s business thereto.
56
Item 13.
B) A breach by the County of any of the terms and covenants or conditions within this
agreement and the failure of the County to remedy such breach for fifteen (15) days after
receipt of written notice from the Operator of the existence of such breach.
14. DEFAULT OF WAIVER
No default or waiver by the County of any of the terms, conditions, covenants,
agreements hereof to be performed, kept, or observed by the Operator shall be
construed or act as a waiver of any subsequent default of any of the terms, covenants,
conditions, and agreements, herein contained to be performed, kept, or observed by the
Operator, and County shall not be stopped from later enforcing any of the terms and
conditions of this Agreement.
15. COMPLAINTS BY THE PUBLIC
Complaints by the public or other Airport service personnel concerning Operator’s
services may be grounds for termination or suspension of this Agreement as provided in
Paragraph 12(g). The County shall not be responsible for resolving such complaints as
may be received concerning Operator’s fares, services, conduct, reservations, policies,
etc. Such complaints will be forwarded to the Operator, who will be responsible for their
resolution.
16. GRANT AGREEMENTS
The Airport is subject to the County’s assurance made to guarantee the public use of the
Airport pursuant to grant agreements between the County and the United States of
America. The County represents that none of the provisions of this Agreement violate
any of the provisions of any of those agreements.
17. RIGHT TO DEVELOP AIRPORT
The County reserves the right to further develop or improve the Airport and all landing
areas, taxiways, and terminal areas as it may see fit; provided, however, that such
development or improvement does not adversely affect Operator’s rights and duties
under this Agreement.
18. SUBORDINATION OF AGREEMENT
This Agreement shall be subordinate to the provisions of any existing or future agreement
between the County and the United States of America or its boards, agencies, counties,
or instrumentalities relative to the operation or maintenance of the Air port, the
execution of which has been or may be required as a condition precedent to the
expenditure of federal funds on the development of the Airport.
19. NON-DISCRIMINATION
The Operator, for himself, his personal representatives, successors in interest, and
assigns, as a part of the consideration hereof, does hereby covenant and agree that:
57
Item 13.
A) No person on the grounds of race, color, sex, or national origin shall be excluded from
participation in, denied the benefits of, or otherwise be subjected to discrimination in
the use of said facilities.
B) That in the construction of any improvements on, over, or under such land and the
furnishing of services thereon, no person on the grounds of race, color, sex, or
national origin shall be excluded from participation in, denied the benefits of, or
otherwise be subjected to discrimination.
C) That the Operator shall use the premises in compliance with all other requirements
imposed by or pursuant to Title 49, Code of Federal Regulations, Department of
Transportation, Sub -title A, Office of the Secretary, Part 21, Non -discrimination in
Federally Assisted Programs of the Department of Transportation – Effectuation of
Title VI of the Civil Rights Acts of 1964, and as said Regulations may be amended.
D) That in the event of a Breach o f any of the above nondiscrimination covenants, the
County shall have the right to terminate this Agreement and to re-enter and repossess
said land and the facilities thereon and hold the same as if said Agreement had never
been made or issued.
This provision shall not be effective until the procedures of Title 49 CFR Part 21 are
followed and completed, including exercise or expiration of appeal rights.
20. GENERAL PROVISIONS
A) South Carolina Law: This Agreement has been made and shall be construed in
accordance with the laws of the State of South Carolina.
B) Headings: The headings contained herein, are for convenience of reference and are
not intended to define or limit the scope of any provisions of this Agreement.
21. NOTICE
Any Notice required or permitted under this Agreement shall be deemed duly given when
mailed by certified mail or registered mail addressed to the County or Operator,
respectively, at the addresses hereinafter shown or at the add resses hereafter specified
in writing, postage prepaid, and deposited in any United States Post Office.
The address of the County/Airport is:
County Council of Beaufort County
Hilton Head Island Airport
120 Beach City Road
Hilton Head Island, SC 29926
58
Item 13.
The address(es) of the Operator is/are:
Mail: ______________________________________________
______________________________________________
Physical: ______________________________________________
______________________________________________
Phone: ______________________________________________
E Mail ______________________________________________
_______________________________ ______________________________
WITNESS COUNTY ADMINISTRATOR
BEAUFORT COUNTY
DATE________________________
_______________________________ ______________________________
WITNESS OWNER , _____________________
DATE________________________
59
Item 13.
BEAUFORT COUNTY COUNCIL
HILTON HEAD ISLAND AIRPORT
SHUTTLE RULES
The following rules shall apply to the operation of shuttles and conduct of drivers at the
Hilton Head Island Airport.
Rule 1
Permitted Locations:
No other location on Airport property shall be used except the Shuttle Parking area, for any
business or commercial purpose, directly or indirectly, by shuttle operators.
Rule 2
Attending Vehicle:
Vehicles shall not be left standing unattended in any location on airport property with the
engine running.
Rule 3
Permitted Time:
Operator vehicles are limited to (1) hour parking in the designated Shuttle Parking area for each
visit.
60
Item 13.
RESOLUTION 2023/_____
A RESOLUTION BY THE BEAUFORT COUNTY COUNCIL AUTHORIZING THE INTERIM
POLICY ON AIRPORT SHUTTLE SERVICE; CASE OF BEST OF HILTON HEAD
WHEREAS, the Hilton Head Island Airport does not have a current shuttle service policy; and
WHEREAS, “The Best of Hilton Head” operates a shuttle service and requested to operate at the
Hilton Head Island Airport; and
WHEREAS, the FAA sponsor assurances require that airports make ever y effort to become
financially self-sufficient; and
WHEREAS, the interim shuttle policy provides a revenue-generating opportunity in favor of the
Hilton Head Island Airport via a $1.00 per passenger ($5.00 minimum per vehicle per trip) charge; and
WHEREAS, Council has determined that the proposed shuttle service is in the best interest of its
citizens as a means of transporting residents and citizens who use the Hilton Head Island Airport.
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly assembled, does
hereby authorize the Hilton Head Island Airport to implement the subject interim policy on shuttle service
.
Adopted this ____ day of __________, 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY: _______________________________
Joseph Passiment, Chairman
ATTEST:
________________________________
Sarah W. Brock, Clerk to Council
61
Item 13.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of Award to First Construction Management for IFB #081023E Bluffton Parkway Pathway
Project ($227,010.44)
MEETING NAME AND DATE:
Public Facilities Committee – August 28, 2023
PRESENTER INFORMATION:
Eric Claussen – Director of Engineering (5 mins)
ITEM BACKGROUND:
On July 10, 2023, Beaufort County published IFB #081023E Bluffton Parkway Pathway Project requesting
competitive bids for the material procurement and construction of a pathway along Bluffton
Parkway near SC 46. On August 10, 2023, The County received four (4) bids to perform the specified
scope. First Construction Management was the apparent lowest responsive bid.
PROJECT / ITEM NARRATIVE:
As part of the 2018 one cent transportation sales tax, a program of pathways was identified for construction
to provide better and safer access to pedestrians at key areas on Beaufort County. This pathway along
Bluffton Parkway was one of the projects identified and will connect two existing pathways near SC 46. The
project was originally bid June 9, 2022 with no contract ever being executed. The project was put out to rebid
July 10, 2023 with an alternative allowing a concrete pathway. The project will consists of all materials and
construction to complete approximately 650’ of 8’ wide concrete pathway extending from the SC 46 to the
existing pathway at Soperton Dr.
FISCAL IMPACT:
The contract fee is for materials and construction in the amount of $189,175.37. Staff recommends
a 20% contingency of $37,835.07, bringing the project’s total cost to $227,010.44. The funding for
this project will be 2018 One Cent Sales Tax – Sidewalks and Pathways account number 47050011-54510
with a balance of $21,274,070.40.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award First Construction Management for IFB #081023E Bluffton Parkway
Pathway Project
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny recommendation to award First Construction Management for IFB #081023E
Bluffton Parkway Pathway Project
Next Step: Move forward to County Council to award First Construction Management for IFB #081023E
Bluffton Parkway Pathway Project
62
Item 14.
Bid Recorder
Bid Administrator Signature
PRELIMINARY BID TABULATION
PURCHASING DEPARTMENT
The following bids were received for the above referenced project:
BIDDER
BID
FORM
ALL
ADDENDA
Bid
Bond
SCH OF
VALUES
SMBE Docs
Sub Listing
Grand Total Price
First Construction Mainagement
X
X
X
X
Self Performing
NA
$ 189,175.37
Atlantic Asphalt
X
X
X
Self Performing
NA
$ 275,869.82
AOS Specialty Contractors
X
X
X
X
X
$ 361,606.26
JS Construction
X
X
X
X
X
X
$ 254,413.82
Beaufort County posts PRELIMINARY bid tabulation information within 2 business days of the advertised bid opening. Information on the PRELIMINARY bid tabulation is
posted as it was read during the bid opening. Beaufort County makes no guarantees as to the accuracy of any information on the PRELIMINARY tabulation. The bid results
indicated here do not necessarily represent the final compliance review by Beaufort County and are subject to change. After the review, the final award will be made by
Beaufort County Council and a certified bid tab will be posted online.
8/11/2023
Project Name:
Bluffton Parkway Pathway Project
Project Number:
IFB 081023E
Project Budget:
Bid Opening Date: 10-Aug-23
Time: 3:00:00 PM
Location: Beaufort County
Bid Administrator: Dave Thomas
Bid Recorder: Victoria Moyer
63
Item 14.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation to purchase a Mower Max with front lift and boom attachments for the Public Works
Department - Roads and Drainage Division ($276,786.29)
MEETING NAME AND DATE:
Public Facilities Committee Meeting – August 28th, 2023
PRESENTER INFORMATION:
Jared Fralix, P.E., Assistant County Administrator, Infrastructure
Neil J. Desai, P.E., Public Works Director
(5 Minutes)
ITEM BACKGROUND:
The purchase of a new Mower Max is to replace a 2004 John Deere 7220 Farm Tractor with boom arm that
has 4,334 hours.
PROJECT / ITEM NARRATIVE:
Purchase of Mower Max with mulching head, boom, and front lift attachment. The Mower Max is a piece of
equipment that is used in numerous different facets and is essential to a more efficient and productive
operation for the Roads and Drainage Division for the maintenance of County rights of way and roadside
systems.
FISCAL IMPACT:
A quote has been provided from ATMAX, sole source in the amount of $276,786.29. The funding source for
this item was approved in the FY2024 budget meeting for Public Works account number 10401301-54000.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends the purchase of a Mower Max with front lift and boom attachments for the Public Work
Department
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny the recommendation to purchase a Mower Max with front lift and boom
attachments for the Public Works Department.
(Next Step: Move forward to County Council for on September 11, 2023)
64
Item 15.
65
Item 15.
ENGINEERED FOR PERFORMANCE
The revolutionary, 3rd Generation MowerMax Boom Mower is designed and
purpose built from the ground up to have the best Stability, Visibility, Maneu-
verability and Versatility of any boom mower on the market. The MowerMax is
a heavy-duty boom mower that is also very safe, easy to operate and maintain.
66
Item 15.
The MowerMax is designed to have a low center of
gravity. The counterweights are mounted directly opposite
the boom for maximum benefit and it’s easy to add
additional counterweights. These features combined with
the rear axle stabilizer system, make the MowerMax an
extraordinarily stable machine.
OPTIMUM STABILITY
The MowerMax is extremely simple to operate and very
comfortable for the operator! The MowerMax is easy to
get into and out of with non slip coated steps integrated
into the main counter-weight. The cab has a plush,
Grammer air-ride suspension seat with tilt and lumbar,
a tilt & telescoping steering wheel with steering knob,
6.2in color AM/FM/CD stereo with Bluetooth & optional
Backup Camera, and a 7in Control Display.
INCOMPARABLE VISIBILITY
EXTREMEL Y SIMPLE & COMFORTABLE
The MowerMax cab forward design greatly enhances the operator’s visibility
making for a much more productive and safer cutting experience. Plus the right
side of the cab has an unobstructed view.
67
Item 15.
The MowerMax has hydrostatic, 2 speed transmission
which is operated by two foot pedals and comes
with permanent 4 wheel drive with 45% limited
slip front axle and 100% operator controlled rear
differential lock. The MowerMax Boom also has
4 wheel steering with 3 different steering modes:
1) 4 Wheel Steer 2) Front Wheel Steer or 3) Crab
Steer. These three steering modes allows the
MowerMax to be extremely maneuverable and
productive. Lastly all of MowerMax booms come
with 180 degree rotation with a helical actuator for
maximum operating flexibility.
The MowerMax Boom is extremely versatile with 4 different boom head
attachments as well as the optional front lift arms with universal quick attach
mounts that allows you to use over 30 common skid steer attachments.
OUTSTANDING MANEUVERABILITY
SERIOUS VERSATILITY
4-WHEEL
FRONT
CRAB
60in Rotary Deck
50in HD Flail
84in Broom
96in Front Rotary Deck
90in Quad Saw
Universal Quick Attach50in Fecon Mulcher 68
Item 15.
ATMAX Equipment knows that boom mowing often happens on busy roads
under rough conditions, so safety of the operator and the machine are of
utmost importance! 1/2in Lexan Glass on boom side. ROPS & FOPS - Most
tractors and other purpose built boom mowers only have ROPS even though
all trim trees with them! Bright Yellow Powder Coated Paint with 2 front LED
daytime running lights, 2 reflective SMV diamonds, 2 - SAE Class 1 strobes,
1 - 35in LED directional control bar, 12 amber/white mini LED flashers, and
over 30ft of reflective decals and DOT tape.
EXCEPTIONALL Y SAFE
69
Item 15.
DAVID: 813-781-0100
(FL, TX, LA, VA, WV, MO)
NEAL: 423-595-4897
(AL, AR, GA, TN, SC, NC)
PATRICK: 614-306-6887
(OH, IN, KY, IL, MI, PA)
Call to schedule a demonstration:
70
Item 15.
Boom Arm Attachments
50in & 60in Rotary Deck
with optional 90 Degree Swivel
50in Fecon Mulching Head
with optional 180 Degree Rotate
50in HD Flail with
optional 180 Degree Rotate
62in Standard Flail
with optional 180 Degree Rotate
50in Hammer Flail
with optional 180 Degree Rotate
71
Item 15.
Boom Arm Attachments
Triple or Quad Saw
with optional 90 Degree Rotate
48in Single Saw
with optional 90 Degree Rotate
55in Grapple with 360 Rotator
(available on summer 2021 units) 22in Ditch Maintainer
with Adjustable Hydraulic Chute
72
Item 15.
Front Lift Arm Attachments
Angled Broom
Cold Planer (pot hole repair) Buffalo Blower
(for dirt, leaves and light snow)
96in Rotary Mower
Chipper
Guardrail Mower
73
Item 15.
Front Lift Arm Attachments
Dozer Blade Pallet Forks
Stump Grinder Brush Grapple
(moving debris off roads) Pavement Saw
Trencher
Snow Blower
120in Snow Plow
with Hydaulic Angling Snow Pusher
74
Item 15.
Quote
Date
8/2/2023
Quote #
4150
Name / Address
Beaufort Co, SC
120 Shanklin Rd
Beaufort SC 29906
6902 E. 7th Ave.
Tampa, FL 33619
Rep
NC
8136341111 x 4 WWW.MOWERMAX.COM
Total
Item Description Qty Cost Total
MMB Gen 3 New Mower Max Boom - Gen 3 1 191,282.50 191,282.50T
24ft Boom Arm 24ft Boom Arm without Head Attachment 1 14,386.45 14,386.45T
Rotary Deck MMB 60in Rotary Deck with hydraulic controlled deck door,
Quick Disconnect and 90 Degree System
1 16,363.75 16,363.75T
Front Lift Front Lift Arms with Universal Attachment Mount and
Hydraulic QDS
1 10,416.25 10,416.25T
Rev Fan Reversing Radiator Fan 1 1,088.75 1,088.75T
MM Boom Std - Gen 3STANDARD EQUIPMENT INCLUDED:
154 HP Turbo Diesel, Stage V Cummins
4-Speed Hydrostatic Transmission
6 Section Valve Bank with Electro-Hydraulic Joystick
Controls
3450lbs Counterweight with Integrated Steps
Cab certified for both ROPS - ISO 3471 and FOPS - ISO3449
Red Dot AC/Heat Cab with AM/FM/DVD 6.2in Touchscreen
with Blue Tooth and iPod Control
Heavy duty Radial Multi-Purpose Tires
180 Deg Boom Rotation
Full time 4WD and 4 Wheel Steering with Rear Axle
Stabilizer
Front headlights with LED daytime running lights, turn
lights and rear brake lights with turn lights
1-Class 1 LED Strobes, 12 LED Mini Flasher/Strobes and 1 -
36in LED Directional Control Bar
12v Air-ride, Grammer cloth seat with lumbar, tilt, arm
rest & two safety switches
Training - Operator and Safety
Back-up alarm and camera
0.00 0.00T
SHIPPING & HANDL... SHIPPING & HANDLING - Included 1 0.00 0.00
SC Contract SC State Contract No. 4400032503 0.00 0.00T
Quote is good through 10/1/23
Sales Tax 7.00% 16,347.64
$249,885.34
75
Item 15.
Quote
Date
8/2/2023
Quote #
4151
Name / Address
Beaufort Co, SC
120 Shanklin Rd
Beaufort SC 29906
6902 E. 7th Ave.
Tampa, FL 33619
Rep
NC
8136341111 x 4 WWW.MOWERMAX.COM
Total
Item Description Qty Cost Total
Stump Grinder Stump Grinder for front lift arms 10,249.50 10,249.50T
Ditch Maintainer Ditch Maintainer with Quick Disconnect System 1 15,128.75 15,128.75T
SC Contract SC State Contract No. 4400032503 0.00 0.00T
Quote is good through 10/1/23
Sales Tax 6.00% 1,522.70
$26,900.95
76
Item 15.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation to purchase a Bucket Truck (Dodge RAM 5500 4x4 Cummins Diesel Terex LT40) for Traffic
Operations ($162,299) under State Contract #060920
MEETING NAME AND DATE:
Public Facilities Committee Meeting – August 28th, 2023
PRESENTER INFORMATION:
Jared Fralix, P.E., Assistant County Administrator, Infrastructure
Neil J. Desai, P.E., Public Works Director
(5 Minutes)
ITEM BACKGROUND:
New vehicle (aerial equipment) purchase.
PROJECT / ITEM NARRATIVE:
Purchase of a Bucket Truck for Traffic Operations.
FISCAL IMPACT:
A quote has been provided from Custom Truck One Source. This is on Source Well Contract # 060920, in the
amount of $162,299. The funding source for this item was approved in the FY 24 budget for Public Works.
Account number 10401301-54000.
STAFF RECOMMENDATIONS TO COUNCIL:
Public Works Director and the Fleet Manager recommend approving the purchase of the Bucket Truck for
Traffic Operations to replace 2008 F450 Bucket Truck 128,501 miles (failed Safety inspection due to over the
10 years/125,000 miles)
OPTIONS FOR COUNCIL MOTION:
Motion to either accept/deny the recommendation to approve the purchase of the Bucket Truck.
Next Steps - A Majority Vote for Acceptance by Committee would move item forward to final acceptance by
full County Council vote.
77
Item 16.
78
Item 16.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation to purchase a Dump Truck for the Public Works Department - Roads and Drainage Division
($253,143.00)
MEETING NAME AND DATE:
Public Facilities Committee Meeting – August 28th, 2023
PRESENTER INFORMATION:
Jared Fralix, P.E., Assistant County Administrator, Infrastructure
Neil J. Desai, P.E., Public Works Director
(3 Minutes)
ITEM BACKGROUND:
Ther purchase of a new dump truck is to replace a 2004 Dump Truck with 252,480 miles. Standard
replacement schedule is for 10 years/120,000 miles.
PROJECT / ITEM NARRATIVE:
Purchase of the Dump Truck for the Public Works Department – Roads and Drainage Division.
FISCAL IMPACT:
A quote has been provided from Peterbilt. This is on Source Well Contract # 060920, in the amount of
$253,143.00 The funding source for this item was approved in the FY 24 budget for Public Works.
Account number 10401301-54000.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends to the purchase of the dump truck for Public Works as planned in the current fiscal year
budget.
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny the recommendation to purchase of the Dump Truck for Public Works.
(Next Step: Move forward to County Council for on September 11, 2023)
79
Item 17.
80
Item 17.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation to Approve the Purchase of Four Replacement Ambulances for Beaufort County EMS
Department ($1,039,984.00)
MEETING NAME AND DATE:
Public Facilities and Safety Committee on August 28, 2023
PRESENTER INFORMATION:
Jared Fralix, ACA Infrastructure (10 minutes)
ITEM BACKGROUND:
In FY 2022, two ambulance remounts were approved in the budget and ordered from HGAC Buy Cooperative.
In FY 2023, two new ambulances were approved in the budget and ordered with the same vendor. As of the
start of FY 2024, none of the four ordered ambulances had been built nor delivered to the County.
PROJECT / ITEM NARRATIVE:
Recently, the EMS department was notified by HGAC Buy Cooperative that four new ambulances were made
available due to a canceled order from another entity. The EMS department has confirmed that the four new
ambulances available meet the specifications of those previously ordered and would be a suitable
replacement. The vendor has confirmed that if we accept the four new ambulances, we can cancel our two
previous orders at no charge.
FISCAL IMPACT:
Since we have closed out the FY 22 books, if we cancel that order the allocated funds will return to the
General Fund. The funds for the FY 23 order have been rolled forward to FY 24 budget. In the FY 24 Capital
Fund, $1,203,000 was budgeted for EMS ambulance purchases. Between the FY 23 rollover funds and the FY
24 Capital Funds, there is sufficient funding to purchase the four ready-to-go ambulances.
FY 23 Account# 10001230-54000 via PO 20220701 (Balance of $310,878)
FY 24 Account# 10401230-54000, EMS Vehicle Purchase (Balance of $1,203,000)
Total Cost: $259,996.00 each x 4 ambulances = $1,039,984
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends canceling the previous orders of four ambulances from HGAC Buy Cooperative for the
purchase of four ready-to-go ambulances from the same vendor for a total purchase cost of $1,039,984.00.
OPTIONS FOR COUNCIL MOTION:
Approve the purchase of four ready-to-go ambulances from HGAC Buy Cooperative for a purchase cost of
$1,039,984.
Deny the purchase of four ready-to-go ambulances from HGAC Buy Cooperative, keep the existing ambulance
orders with the same vendor, and wait for the delivery of those previously ordered vehicles.
(Next Step: Pending approval to purchase, this item would move forward to County Council for approval on
September 11, 2023)
81
Item 18.
82
Item 18.
Source: Beaufort County website. First collected Nov 21, 2026.