Public Facilities and Safety Committee — Agenda Packet
Beaufort County · Beaufort County · Public Facilities Committee · meeting of May 22, 2023 · Agenda packets
Open the original document More from Beaufort County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, May 22, 2023
3:00 PM
AGENDA
COMMITTEE MEMBERS:
BLOGAN CUNNINGHAM, CHAIRMAN DAVID P. BARTHOLOMEW, VICE-CHAIRMAN
THOMAS REITZ PAULA BROWN
ANNA MARIA TABERNIK JOSEPH F. PASSIMENT, EX-OFFICIO
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. PUBLIC NOTIFICATION OF THIS MEETING HAS BEEN PUBLISHED, POSTED, AND DISTRIBUTED IN
COMPLIANCE WITH THE SOUTH CAROLINA FREEDOM OF INFORMATION ACT
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES- April 24, 2023
6. CITIZEN COMMENT PERIOD- 15 MINUTES TOTAL
Anyone who wishes to speak during the Citizen Comment portion of the meeting will limit their
comments and speak no longer than three (3) minutes. Speakers will address Council in a respectful
manner appropriate to the decorum of the meeting, refraining fr om the use of profane, abusive, or
obscene language.
AGENDA ITEMS
7. DISCUSSION ON REIMAGINE RIBAUT ROAD
8. RECOMMEND APPROVAL OF AN ORDINANCE (by title only) AUTHORIZING THE COUNTY ADMINISTRATOR
TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF A PORTION
OF REAL PROPERTY LOCATED ON HIGHWAY 170 WITH TMS NO. R600 008 000 0005 0000.
9. RECOMMEND APPROVAL OF A RESOLUTION AND APPROVAL TO ENTER INTO AN IGA WITH THE TOWN OF
HILTON HEAD FOR AN EXPENDITURE OF TRANSPORTATION IMPACT FEES ON THE ADAPTIVE TRAFFIC
SIGNAL MANAGEMENT (ATSM) SYSTEM (FISCAL IMPACT: $3,100,000 TO COME FR OM ACCOUNT
23020011-51160 WITH A BALANCE OF $3,298,434)
1
County Council Agenda – Beaufort County, SC
10. RECOMMEND APPROVAL OF A RESOLUTION ESTABLISHING A TAX ADVISORY COMMITTEE TO PLAN FOR A
FUTURE SALES TAX PROGRAM
11. RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE
THE NECESSARY DOCUMENTS FOR THE PURCHASE OF A PORTION OF THE REAL PROPERTY ABUTTING THE
HILTON HEAD ISLAND AIRPORT LOCATED ON SUMMIT DRIVE WITH TMS NO. R510 005 000 271A 0000
12. RECOMMEND APPROVAL OF A HANGAR FEE INCREASE AT THE HILTON HEAD ISLAND AIRPORT (HXD) AND
BEAUFORT EXECUTIVE AIRPORT (ARW)
13. RECOMMEND APPROVAL OF A CONTRACT AWARD TO WSP FOR THE JOE FRAZIER ROAD CORRIDOR STUDY
(FISCAL IMPACT: $213,890)
14. RECOMMEND APPROVAL OF A CONTRACT AWARD TO HDR ENGINEERING, INC FOR THE US 21 CORRIDOR
ACCESS MANAGEMENT PLAN (FISCAL IMPACT: $217,992.92)
15. RECOMMEND APPROVAL OF A RESOLUTION TO USE IMPACT FEES TO RETAIN HDR ENGINEERING, INC TO
STUDY, RECOMMEN D, AND DESIGN ENHANCEMENTS TO BLUFFTON PARKWAY PEDESTRIAN
ACCOMMODATIONS AND AESTHETICS AKA BLUFFTON PARKWAY ENHANCEMENT PROJECT ( FISCAL
IMPACT: $259,954.84)
16. RECOMMENDATION OF AWARD TO KIMLEY HORN F OR THE INTELLIGENT TRANSPORTATION SYSTEMS
(ITS) MASTER PLAN (FISCAL IMPACT: $275,000.00 TO BE PAID FROM ACCOUNT 10401243-54500 WITH A
BALANCE OF $4,353,958.64)
17. RECOMMENDATION OF CONTRACT AWARD TO TRINITY ELECTRICAL FOR THE HHI AIR TRAFFIC CONTROL
TOWER TECHNOLOGY IMPROVEMENTS. (FISCAL IMPACT: $268,695.00)
18. RECOMMEND APPROVAL OF A CONTRACT AWARD TO LSP3 FOR THE DESIGN OF THE PUBLIC WORKS
BUILDING (FISCAL IMPACT: $1,467,636)
EXECUTIVE SESSION
19. PURSUANT TO S.C. CODE SEC. 30-4-70 (A) (1) DISCUSSION OF APPOINTMENTS OF PERSONS TO A PUBLIC
BODY (GREEN SPACE ADVISORY COMMITTEE)
20. MATTERS ARISING OUT OF EXECUTIVE SESSION
21. ADJOURNMENT
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
2
Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, April 24, 2023
4:30 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the
complete meeting. https://beaufortcountysc.new.swagit.com/videos/224623
1. CALL TO ORDER
Committee Vice-Chairman Bartholomew called the meeting to order at 4:30 PM.
Committee Vice Chairman Bartholomew led the meeting since Committee Chairman Cunningham was
participating via Zoom.
PRESENT
Chairman Logan Cunningham
Vice-Chairman David P. Bartholomew
Council Member Paula Brown
Council Member Anna Maria Tabernik
Ex-Officio Joseph F. Passiment
Council Member York Glover
Council Member Alice Howard
Council Member Lawrence McElynn
Council Member Gerald Dawson (arrived late)
ABSENT
Council Member Mark Lawson
Council Member Thomas Reitz
2. PLEDGE OF ALLEGIANCE
Committee Vice-Chairman Bartholomew led the Pledge of Allegiance.
3. FOIA
Committee Vice -Chairman Bartholomew noted that public notification of this meeting had been
published, posted, and distributed in compliance with the South Carolina Freedom of Information Act.
4. APPROVAL OF AGENDA
Motion: It was moved by Council Member Tabernik, seconded by Council Member Brown, to approve the
agenda.
3
Item 5.
County Council Minutes – Beaufort County, SC
The Vote - The motion was approved without objection.
5. APPROVAL OF MINUTES
Motion: It was moved by Council Member McElynn, seconded by Council Member Tabernik, to approve
the minutes of February 27, 2023.
The Vote - The motion was approved without objection.
6. CITIZEN COMMENT PERIOD
No citizen comments.
7. RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER
INTO A LEASE AGREEMENT FOR REAL PROPERTY LOCATED AT 32 HUNTER ROAD WITH ACE HARDWARE
OF HILTON HEAD
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/224623?ts=114
Motion: It was moved by Council Member Brown, seconded by Council Member Passiment, to
recommend approval of a resolution authorizing the County Administrator to enter into a lease agreement
for real property located at 32 Hunter Road with Ace Hardware of Hilton Head.
Discussion: Council Member Glover asked about the purpose of the item.
County Administrator Greenway briefed the Committee on how the properties in items 7 and 8 are around
the boundary of Hilton Head Island Airport, and that the plan is to lease these properties until the buildings
get torn down with the airport improvements.
Committee Vice-Chairman Bartholomew commented that the lease would generate $24,795.00 in annual
lease revenue.
The Vote - The motion was approved without objection.
8. RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER
INTO A LEASE AGREEMENT AND COMMERCIAL OPERATING AGREEMENT FOR REAL PROPERTY LOCATED
AT 32 HUNTER ROAD WITH GITIBIN & ASSOCIATES, LLC DBA GO RENTALS
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/224623?ts=207
Motion: It was moved by Council Member McElynn, seconded by Council Member Howard, to
recommend approval of a resolution authorizing the County Administrator to enter into a lease agreement
and commercial operating agreement for real property located at 32 Hunter Road with Gitibin &
Associates, LLC doing business as Go Rentals.
Discussion: Council Member Tabernik commented that the rental c ar business would serve the people
arriving at Hilton Head Airport well.
Committee Vice-Chairman Bartholomew commented that the lease would generate $16,947.72 annually
in addition to the 10% of the gross revenues for the parking spaces.
The Vote - The motion was approved without objection.
9. RECOMMEND APPROVAL TO AWARD IFB #011223E BEAUFORT COUNTY DIRT ROAD ROCKING
CONTRACT #54 TO J.H. HIERS FOR COUNTY OWNED ROADS ($5,291,646.80)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/224623?ts=280
4
Item 5.
County Council Minutes – Beaufort County, SC
Motion: It was moved by Council Member McElynn, seconded by Council Member Passiment, to
recommend approval to award IFB #011223E Beaufort County Dirt Road Rocking Contract #54 to J.H. Hiers
for county-owned roads.
Discussion: Council Member Brown and County Administrator Greenway discussed the bidding process
for this contract.
Council Member Glover asked about legacy roads on Daufuskie Island. County Administrator Greenway
replied that litigation for Prospect Road is ongoing.
Assistant County Administrator Fralix discussed the dirt road paving through the TAG program, the paving
schedule for Prospect Road, School Road, and Church Road, Daufuskie Island Council’s requests regarding
road pavement, and consolidation of the paving projects to get economies of scale for transportation and
logistics.
Committee Vice-Chairman Bartholomew asked if the roads are county roads. ACA Fralix replied that the
dirt road paving program is only for county-owned roads.
Committee Chairman Cunningham asked if there was an estimate of money saved by consolidating the
road projects. ACA Fralix replied that there is not an estimate, but that there will be thousands of dollars
saved in logistics costs.
The Vote - The motion was approved without objection.
10. RECOMMEND APPROVAL TO AWARD THE CONSTRUCTION MANAGEMENT AND INSPECTION FOR THE
SC 170 NEAR-TERM IMPROVEMENTS TO HDR ($673,351.48)
Please watch the video stream available on the County's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/224623?ts=500
Motion: It was moved by Council Member Passiment, seconded by Council Member McElynn, to
recommend approval to award the construction management and inspection for the SC 170 near -term
improvements to HDR.
Discussion: Council Member Tabernik asked about saf ety and capacity improvements along 170 from
Okatie Center South to SC 462.
ACA Fralix discussed a 2019 study commissioned to determine improvement and safety recommendations
for SC 170. The long-term recommendation was to widen to six lanes a four-and-a-half-mile segment from
Okatie Center South to SC 462 and to add safety initiatives at specific intersections. The short -term
recommendation was to make improvements at five intersections to provide immediate relief.
Council Member Tabernik asked about the timeline. ACA Fralix replied that planning would go out for bid
in a couple of weeks, with improvements to start in the middle of the summer and be finished by the end
of the year.
Council Member Glover asked about drainage and raised concerns with catch basins. ACA Fralix replied
that they are trying to stay within the confines of existing pavement, so drainage on this project is minimal.
He also discussed the types of drainage systems and required maintenance.
The Vote - The motion was approved without objection.
11. ADJOURNMENT
Adjourned: 4:46 PM
Ratified:
5
Item 5.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Discussion on Reimagine Ribaut Road
MEETING NAME AND DATE:
Public Facilities and Safety Committee – May 22, 2023
PRESENTER INFORMATION:
Eric Claussen, Engineering Director
10 mins
ITEM BACKGROUND:
Beaufort County is contracted with Stantec Consulting Services Inc. to develop a comprehensive
master plan for transportation safety and mobility along Ribaut Road from Boundary Street to the
Russell Bell Bridge. For regular updates on this project, please visit www.reimagineribautroad.com.
PROJECT / ITEM NARRATIVE:
Staff will discuss the development of the master plan to date, milestone schedule, and needs for
adoption and implementation of the plan.
FISCAL IMPACT:
N/A
STAFF RECOMMENDATIONS TO COUNCIL:
N/A
OPTIONS FOR COUNCIL MOTION:
N/A
6
Item 7.
{��-· � Reimagine Ribaut Road Master Plan
�i:f Project Survey
Hello!
You are invited to participate in our community
survey for the Reimagine Ribaut Road Master Plan.
In this survey, you and other members of the
community will share your thoughts, as well as
identify problem areas and possible solutions, as a
user of Ribaut Road from Boundary Street to the
Russell Bell Bridge. You can visit
https://www.reimaqineribautroad.com to learn more.
1. How. long have you lived along or near
Riba.MtRoad?
[ ] <1 year
I ] 1-5 years
I ] 6-10 years
I ] 10+ years
I ] I do not live near Ribaut Road
2. What is your home zip code?
What is your work I school zip code?
3. What is your primary mode of
transportation on a daily basis?
[ ] I drive alone
[ ] Ridesharing/I ride with someone
[ ] Beaufort Area Transit (BATS)
[] Walk
[ ] Bike
[ ] Other? Tell us!
The survey should take less than 1 O minutes to
complete. Your participation in this study is
completely voluntary, and you are free to exit the
survey at any time. Your answers are strictly
confidential, and data from this survey will be
reported only in the aggregate.
Thank you very much for your time and
support. Your perspective is a valuable resource in
making our community's transportation system safe
and convenient.
4. Do you own or have access to a car?
[] Yes
[ ] No
I ] Sometimes
5. How often do you use Ribaut Road?
I] Daily
[ ] 1-2 times per week
[ ] 1-2 times per month
[ ] 1-2 times per year
[ ] I do not use Ribaut Road
6. Why do you typically travel along
Ribaut Road? Choose all that apply.
[ ] To travel to and from school
[ ] To travel to and from work
[ ] As a passage to a major highway (commuting or
pass through)
[ ] As a destination to meet with friends or family
[ ] As a destination for shopping or errands
[ ] As a destination for medical needs (Doctor,
Hospital Visits)
[ ] Recreational activities (walking, biking,
accessing park, greenway)
[ ] Other? Tell us!
page1
7
Item 7.
8
Item 7.
9
Item 7.
10
Item 7.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE (by title only) AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY
DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF A PORTION OF REAL PROPERTY LOCATED ON
HIGHWAY 170 WITH TMS NO. R600 008 000 0005 0000
MEETING NAME AND DATE:
May 22, 2023; Public Facilities and Safety Committee
PRESENTER INFORMATION:
Brittany Ward, County Attorney; Jared Fralix, Assistant County Administrator
10 Minutes
ITEM BACKGROUND:
PROJECT / ITEM NARRATIVE:
Beaufort County Council by way of Ordinance No. 2023/10 approved the purchase of approximately
93 acres known as the Cooler Tract on March 27, 2023, for the purpose of establishing a centralized
law enforcement and first responders center. The County has since been conveyed fee simple
ownership of the Cooler Tract. The real property abutting the Cooler Tract consists of approximately
twenty (20) acres owned by Oldfield, LLC. The County desires to purchase the Oldfield property for
purposes of constructing additional administrative buildings that are unrelated to law enforcement.
FISCAL IMPACT:
Fair Market Value of Property; funding coming from 2017 GO Bond 40100011-54500
STAFF RECOMMENDATIONS TO COUNCIL:
Approve the purchase of approximately twenty (20) acres from Oldfield, LLC
OPTIONS FOR COUNCIL MOTION:
Motion to Deny
Move forward to Council for First Reading by title only on May 22, 2023.
11
Item 8.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommend Approval of a Resolution and Approval to Enter into an IGA with the Town of Hilton Head for an
Expenditure of Transportation Impact Fees on the Adaptive Traffic Signal Management (ATSM) System
MEETING NAME AND DATE:
Public Facility and Safety Committee, May 22, 2023
PRESENTER INFORMATION:
Jared Fralix, P.E., Assistant County Administrator, Infrastructure
5 minutes
ITEM BACKGROUND:
Development impact fees are collected to help offset the added pressure that growth in the region places on
our existing infrastructure. In order for a transportation project to be considered as an allowable expenditure,
the roadway has to be included on the Capital Improvement Project list of the Impact Fee Ordinance and the
project has to provide for safety and capacity improvement purposes.
PROJECT / ITEM NARRATIVE:
The Town of Hilton Head, with the coordination of County staff, is working to develop and implement an
Adaptive Traffic Signal Management (ATSM) System within the Town to help more efficiently move traffic on
and within the island. The Town has requested that $3.1M be allocated from the County Traffic Impact fees to
assist with funding of the project as the project meets the program parameters.
FISCAL IMPACT:
The total cost of the request is $3,100,000. The funding for this project is Hilton Head Island – Daufuskie
Island Impact Fees for Professional Services – account 23020011-51160 with a balance of $3,298,434.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval of the resolution and approval to enter an IGA with the Town of Hilton Head for
an expenditure of transportation impact fees on the adaptive traffic signal management (ATSM) system.
OPTIONS FOR COUNCIL MOTION:
Motion to approve the resolution and approval to enter an IGA with the Town of Hilton Head for the
expenditure of transportation impact fees on the adaptive traffic signal management (ATSM) system.
(Move forward to Council for First Reading/Approval/Adoption on June 12, 2023)
12
Item 9.
RESOLUTION 2023/______
A RESOLUTION TO APPROVE THE USE OF TRANSPORTATION IMPACT FEES
TO THE TOWN OF HILTON HEAD ISLAND FOR THE ON THE ADAPTIVE
TRAFFIC SIGNAL MANAGEMENT (ATSM) SYSTEM
WHEREAS, the Town of Hilton Head has recognized the need to install an ATSM system
in all of the traffic signals throughout the Town; and
WHEREAS, the ASTM project will provide safety and capacity improvements that will
provide increased flow in mobility throughout the island; and
WHEREAS, the County collects development impact fees in accordance with the County
Code of Ordinances, Chapter 82 - Impact Fees and such fees may be expended on qualifying
capital or system improvements such as the ATSM project; and
WHEREAS, the County has a sufficient 2023 balance in the Hilton Head Island –
Daufuskie Island service area Traffic Impact Fees account that will cover the $3,100,000 project
request; and
NOW, THEREFORE, BE IT RESOLVED, that County Council approves a $3,100,000
apportionment from the Hilton Head Island – Daufuskie Island service area Traffic Impact Fee
account for the Town of Hilton Head Island’s ATSM project
This Resolution shall be effective June 12, 2023.
Dated this 14th of June 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
_______________________________________
Joseph F. Passiment
Attest:
_____________________________
Sarah W. Brock, Clerk to Council
13
Item 9.
STATE OF SOUTH CAROLINA )
) INTERGOVERNMENTAL AGREEMENT
) TRAFFIC IMPACT FEE DISBURSEMENT
COUNTY OF BEAUFORT )
THIS INTERGOVERNMENTAL AGREEMENT is made and entered into this ___ day
of ____________, 2023 by and between the Town of Hilton Head Island , South Carolina,
(hereinafter referred to as the “Town”), and Beaufort County, South Carolina (hereinafter referred
to as the “County”.)
WHEREAS, the Town and County seek to establish an agreement whereby the County
will offer aid and assistance in the form of funding for the installation of a new Adaptive Traffic
Signal Management (ATSM) system; and
WHEREAS, the Town has recognized the need to install the new ATSM system in all of
the traffic signals throughout the Town; and
WHEREAS, Town Council approved the F iscal Year 20 23 annual budget, which
contained Capital Improvement Program funds in a project line item for the procurement and
installation of the ATSM system; and
WHEREAS, the Town has procured the services of Control Technologies, Inc. via a
Request for Qualifications procurement in accordance with Town Code as the most qualified
offeror to provide and install the desired ATSM system; and
WHEREAS, the Town has a signal maintenance agreement with the South Carolina
Department of Transportation ( SCDOT) for the management of traffic signals on SCDOT roads
within the Town limits; and
WHEREAS, the County collects development impact fees in accordance with the County
Code of Ordinances, Chapter 82 - Impact Fees and such fees may be expended on qualifying
capital or system improvements, such as the ATSM project, in jurisdictions from which they were
derived; and
WHEREAS, the County has a 2023 fiscal year balance of $3,100,000.00 in Traffic Impact
Fees that must be alloca ted to eligible transportation projects within the Hilton Head Island –
Daufuskie Island jurisdictions; and
14
Item 9.
WHEREAS, the County collects development impact fees in accordance with the County
Code of Ordinances, Chapter 82 - Impact Fees and such fees may be expended on qualifying
capital or system improvements such as the ATSM project; and
WHEREAS, pursuant to S.C. Cde of Laws Sections 4-9-40, and 6-1-20, and Article VIII
Section 13 of the State of South Carolina Constitution, cities and counties may enter into
agreements to provide for joint services when mutually desirable; and
NOW, THEREFORE, the below listed agreement is established to better serve the needs
of the Town with respect to emergency maintenance and repair of traffic signals within the Town.
SECTION 1 – DEFINITIONS
A. TRAFFIC IMPACT FEES - These are development impact fees charged by the County in
accordance with the County Code of Ordinances, Chapter 82 - Impact Fees and such fees may
be expended on qualifying capital or system improvements in jurisdictions from which they
were derived.
B. PROJECT - The ASTM system is defined in th e construction contract documents attached
as Exhibit A.
SECTION 2 – PROCEDURES
A. INSPECTION: The Town will notify the County when the work is completed. The County
may inspect the work in a timely fashion and send an electronic mail to the Town to confirm
that the work has been satisfactorily completed or that outstanding tasks remain and need to be
addressed.
B. INVOICES: For all work on the project, the Town shall submit paid invoicing documentation
to the County. The Town shall send the County an invoice(s) for all completed work
requesting reimbursement in an amount not to exceed $3,100,000.00.
C. PAYMENT: The County shall pay the invoice, or advise of any disputed items, not later than
thirty (30) days following the billing date.
SECTION 3 – INSURANCE
Each party to this Agreement shall bear the risk of its own actions, as it does with its day -to-day
operations, and determine for itself what kinds of insurance, and in what amounts, it should carry.
15
Item 9.
A copy of the insurance carrier’s letter or the resolution of self -insurance shall be attached to the
executed copy of this Agreement. Each party shall be solely responsible for determining that its
insurance is current and adequate prior to providing assistance under this Agreement.
SECTION 4 – LIABILITY
Each Party to this Agreement shall be responsible for any and all claims, demands, suits, actions,
damages, and causes of action related to or arising out of or in any way connected with its own
actions, and the actions of its personnel, in providing mutual aid assistance rendered or performed
pursuant to the terms and conditions of this Agreement.
SECTION 5 – TERM
This Agreement shall run through completion of the project and reimbursement of TIF funds to
the Town or December 31, 2023, whichever comes first. This agreement may be terminated upon
thirty (30) days advance written notice by the Parties to this agreement. Notice of termination
shall not relieve the withdrawing Party from obligations incurred hereunder prior to the effective
date of the withdrawal.
SECTION 6 – SEVERABILITY: EFFECT ON OTHER AGREEMENTS
Should any portion, section, or subsection of this Agreement be held to be invalid by a court of
competent jurisdiction, that fact shall not affect or invalidate any other portion, section or
subsection; and the remaining portions of this Agre ement shall remain in full force and affect
without regard to the section, portion, or subsection or power invalidated.
In the event that any parties to this Agreement have entered into other mutual aid agreements or
inter-local agreements, those parties agree that said agreements are superseded by this Agreement
only for emergency management assistance and activities performed in major disasters, pursuant
to this Agreement. In the event that parties of this Agreement have not entered into another mutual
aid agreement, and the parties wish to engage in mutual aid, then the terms and conditions of this
Agreement shall apply unless otherwise agreed between those parties.
IN WITNESS WHEREOF , the Town of Hilton Head Island , South Carolina and Beaufort
County, South Carolina, by and through their duly authorized officers have set their hands and
seals on this _____ day of _______________, 2023.
16
Item 9.
WITNESSES: BEAUFORT COUNTY
___________________________ By: ________________________
___________________________ Its: ________________________
WITNESSES: TOWN OF HILTON HEAD ISLAND
___________________________ By: _________________________
___________________________ Its: __________________________
17
Item 9.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommend Approval of Resolution Establishing a Tax Advisory Committee to Plan for a Future Sales Tax
Program
MEETING NAME AND DATE:
Finance, Administration, and Economic Development Committee, May 15, 2023
PRESENTER INFORMATION:
Jared Fralix, PE, Assistant County Administrator - Infrastructure
5 minutes
ITEM BACKGROUND:
In January 2022, County Council established the tax oversight committee to provide recommendations to
Council for a transportation sales tax program. The recommendations were received but ultimately have yet
to be chosen to bring forth to County referendum at that time. After the committee had performed their
assigned tasks the specific committee was dissolved. Per Council retreat in February 2023, Council is
considering a future sales tax program to look at the overall community needs. Council wishes to establish a
committee to advise it on potential projects.
PROJECT / ITEM NARRATIVE:
County Council proposes to establish a new tax advisory committee to determine what sales tax programs are
needed to support the growing needs of the community.
FISCAL IMPACT:
None
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval of the resolution
OPTIONS FOR COUNCIL MOTION:
Motion to approve resolution to provide for the establishment of a tax advisory committee to plan for a
future sales tax program.
(Move forward to Council for approval of resolution.)
18
Item 10.
RESOLUTION 2023/______
A RESOLUTION ESTABLISHING A TAX ADVISORY COMMITTEE TO PLAN FOR
A FUTURE SALES TAX PROGRAM
WHEREAS, Beaufort County enjoys a high quality of life and provides a great place for
people to live, work and play; and
WHEREAS, South Carolina, and more specifically Beaufort County , has experienced
tremendous population and development growth over the last decade; and
WHEREAS, based on macro migration trends, overall growth within both the state and
County will most likely continue over the coming years; and
WHEREAS, to keep up with the growth , major infrastructure investments within our
communities will be required; and
WHEREAS, based on our county’s tourism-based economy, local sales and use tax
provides the largest and most effective source of funding to address demands on our infrastructure;
and
WHEREAS, with strategic planning and adequate funding to implement the developed
plan, Beaufort County can make the necessary investments in our infrastructure to accommodate
the growth and ensure the character and charm of our community are preserved; and
NOW, THEREFORE, BE IT RESOLVED, to protect, preserve, and enhance the quality
of life and sense of community within the County, Beaufort County Council hereby establishes a
tax advisory committee to plan and prepare for potential sales tax referenda in November 2024
that address investments in our roads, our buildings, and our schools throughout our community.
The sales tax advisory committee will be appointed in a manner that is consistent with S.C. Code
Sec. 4-10-320. It will consist of six (6) members. Three (3) members will be appointed by County
Council. The remaining three (3) members will be appointed by the municipalities as follows:
Town of Hilton Head Island, one (1) member; Town of Bluffton, one (1) member; City of Beaufort
and Town of Port Royal, one (1) member. The Committee will, by a date to be set by Council in
the future, provide council with information that identifies the needs and , where required, the
specific projects for the various referenda questions.
This Resolution shall be effective May 22, 2023.
Dated this 22nd of May 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
_______________________________________
Joseph F. Passiment
Attest:
19
Item 10.
_____________________________
Sarah W. Brock, Clerk to Council
20
Item 10.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY
DOCUMENTS FOR THE PURCHASE OF A PORTION OF THE REAL PROPERTY ABUTTING THE HILTON
HEAD ISLAND AIRPORT LOCATED ON SUMMIT DRIVE WITH TMS NO. R510 005 000 271A 0000
MEETING NAME AND DATE:
Public Facilities & Safety Committee; May 22, 2023
PRESENTER INFORMATION:
Jon Rembold, Airports Director
5 Minutes
ITEM BACKGROUND:
Beaufort County Airports Board - approved with no objection on February 23, 2023
PROJECT / ITEM NARRATIVE:
A portion of Exec Air’s property is inaccessible to them because it now contains airfield lighting,
electrical, and drainage that resulted from the 2017-18 relocation of Taxiway A, when the taxiway was
moved to comply with FAA requirements. The airport discussed the issue with the FAA and they agreed
that the property should be purchased to become part of the airport. As required, an appraisal and
review appraisal were ordered. The market value has been established and is the basis for the offer to
purchase.
FISCAL IMPACT:
$19,800 plus closing costs to be funded by the Airport Operating Budget
Funding for the purchase will be fully reimbursed by grant funds awarded by the South Carolina
Aeronautics Commission.
STAFF RECOMMENDATIONS TO COUNCIL:
Approve the purchase of a portion of real property owned by the Exec Air/Hilton Head Owners
Association, Inc.
OPTIONS FOR COUNCIL MOTION:
Motion to approve /deny the purchase of a portion of the real property owned by the
Exec Air HOA Board
Move forward to County Council on June 12, 2023, for Public Hearing and Approval
21
Item 11.
RESOLUTION 2023/_____
A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE
THE NECESSARY DOCUMENTS FOR THE PURCHASE OF A PORTION OF THE
REAL PROPERTY ABUTTING THE HILTON HEAD ISLAND AIRPORT LOCATED
ON SUMMIT DRIVE WITH TMS NO. R510 005 000 271A 0000
WHEREAS, Beaufort County (“County”) desires to purchase a portion of the real property
owned by the Exec Air/Hilton Head Owners Association, Inc. (“Exec A ir”) located on Summit Drive,
Hilton Head Island, Beaufort County, SC 29926 with Tax Parcel Number R510 005 000 271A 0000
(“Property”); and
WHEREAS, the Hilton Head Island Airport (“Airport”) relocated Taxiway A which
effected the location of drainage , lighting and utilities . Due to the new location of the
aforementioned infrastructure the Property is now located within the active airfield and pursuant
to Federal Aviation Administration (“FAA”) guidelines the said Property must be owned by the
County in order to be in compliance with FAA guidelines; and
WHEREAS, the County agrees to purchase, and the Seller agrees to sell the Property at the fair
market value rate as determined by a licensed real estate appraiser. The parties have agreed to a purch ase
price of $19,800 plus closing costs to be funded by the Airport Operating Budget and to be reimbursed by
previously awarded grant funds from the South Carolina Aeronautics Commission.
WHEREAS, Beaufort County Council finds that it is in the best interest of the citizens and
residents of Beaufort County to purchase the Property in order to comply with the aforementioned FAA
guidelines.
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council , duly
assembled, does hereby authorize the County Administrator to execute the necessary documents
for the purchase of a portion of real property abutting the Hilton Head Island Airport located on
Summit Drive with TMS No. 510 005 000 271A 0000 from Exec Air/Hilton Head Owners
Association, Inc.
Adopted this ____ day of __________, 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Joseph Passiment, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
22
Item 11.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommend Approval of hanger fee increase at Hilton Head Island Airport (HXD) and Beaufort Executive
Airport (ARW)
MEETING NAME AND DATE:
Public Facilities & Safety Committee – May 22, 2023
PRESENTER INFORMATION:
Jon Rembold, Airports Director
5 minutes
ITEM BACKGROUND:
The last fee increases for all County Hangars at HXD and ARW was January 1, 2022.
The proposed increases will go into effect January 1, 2024.
HXD
T-Hangar from $462.00 (current rate) to $485.00
Corporate Hangar (60’x52’) from $1,373.00 (current rate) to $1,442.00
Box Hangar (80’x80’) from $2,815.00 (current rate) to $2,956.00
ARW
T-Hangar from $345.00 (current rate) to $363.00
PROJECT / ITEM NARRATIVE:
Hangar fees are used to fund expenses associated with maintaining hangar buildings, area lighting, area
upkeep, and a small portion of general airfield maintenance.
Below are the current waiting lists for hangar space:
HXD: 37
ARW: 64
FISCAL IMPACT:
Total annual hangar fee revenue:
HXD (5400001-47220)
T-Hangar $5,820.20
Corporate Hangar (60’x52’) $17,304.00
Box Hangar (80’x80’) $35,472.00
ARW (51000011-47210)
T-Hangar $4,356.00
STAFF RECOMMENDATIONS TO COUNCIL:
Approve hangar fee increases for both Airports
OPTIONS FOR COUNCIL MOTION:
Motion to approve /deny the recommendation of Hilton Head Island Airport (HXD) and Beaufort
Executive Airport (ARW) hangar rent increase.
Next step: approval by Council of rate increases.
23
Item 12.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of Award to WSP for the Joe Frazier Road Corridor Study ($213,890)
MEETING NAME AND DATE:
Public Facilities and Safety Committee – May 22, 2023
PRESENTER INFORMATION:
Jared Fralix, PE – ACA Infrastructure Division
Eric Claussen, PE, PTOE – Director of Engineering, Alternative
(5 mins)
ITEM BACKGROUND:
WSP is one of the award firms for Beaufort County’s On-Call Transportation Engineering Services
RFQ#051922E and asked to provide a scope and fee for an engineering study of Joe Frazier Road
between Laurel Bay Road and Broad River Boulevard including the consideration of an extension
southeast of Broad River to US 21 utilizing Goethe Hill Road as identified in the SC 170 Corridor
Access Management Plan.
PROJECT / ITEM NARRATIVE:
The purpose of the Joe Frazier Road Corridor Study is to understand existing and future travel
characteristics and identify alternatives and improvements that address future travel demand and
characteristics; improve safety, mobility, and operations; and are feasible considering land use,
environmental, utility, and right-of-way constraints.
FISCAL IMPACT:
The contract fee is of $194,445.00. Staff recommends a 10% contingency of $19,445, bringing the
project total cost to $213,890. The funding for this project is Capital Funds approved in the 2022/41
Budget Amendment Ordinance – account 10401243-54500 with a balance of $4,353,958.64.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award the contract for the Joe Frazier Corridor Study to WSP.
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny recommendation to award the contract for the Joe Frazier Corridor Study to
WSP.
Next Step: Move forward to County Council to approve/deny recommendation to award the contract
for the Joe Frazier Corridor Study to WSP.
24
Item 13.
Prepared by: WSP
David Gourley, PE, PMP
Date: 4/3/2023
Revised: 4/20/2023
Design Hours Design Total
Study Administration 111 20,835.00$
Preliminary Corridor Studies 380 56,940.00$
Preliminary Structural Analysis 33 7,080.00$
Environmental Studies 7 1,470.00$
Traffic and Safety Analysis 303 48,030.00$
Corridor Planning and Reporting 372 52,590.00$
Other Direct Costs (ODC) 7,500.00$
Subtotal Estimated Compensation 1,206 194,445.00$
Joe Frazier Road
Corridor Study Fee Summary
25
Item 13.
Joe Frazier Road Corridor Study
Project Limits
26
Item 13.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of Award to HDR Engineering, INC for the US 21 Corridor Access Management Plan
($217,992.92)
MEETING NAME AND DATE:
Public Facilities and Safety Committee – May 22, 2023
PRESENTER INFORMATION:
Jared Fralix, PE – ACA Infrastructure Division
Eric Claussen, PE, PTOE – Director of Engineering, Alternative
(5 mins)
ITEM BACKGROUND:
HDR Engineering, INC is one of the award firms for Beaufort County’s On -Call Transportation
Engineering Services RFQ#051922E and was asked to provide a scope and fee for a project to study US
21 between Gardens Corner to Neil Road. Additionally, a short-term solution shall be presented to the
County within the first three (3) months of the contract.
PROJECT / ITEM NARRATIVE:
HDR will provide a multi-modal Corridor Planning Study of the US 21 corridor from US 17 to Neil Road,
to plan for future growth, evaluate safety, analyze access management opportunities, and to prepare
short-term and long-term improvement recommendations for the corridor.
FISCAL IMPACT:
The contract fee is $198,175.38. Staff recommends a 10% contingency of $ 19,817.54, bringing the
project’s total cost to $ 217,992.92. The funding for this project is Capital Funds approved in the
2022/41 Budget Amendment Ordinance – account 10401243-54500 with a balance of $4,353,958.64
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award the contract for the US 21 Corridor Access Management Plan to
HDR Engineering, INC.
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny the recommendation to award the US 21 Corridor Access Management Plan
to HDR Engineering, INC.
Next Step: Move forward to County Council to approve/deny the recommendation to award US 21
Corridor Access Management Plan to HDR Engineering, INC.
27
Item 14.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
April 25, 2023
Brittanee Bishop
Transportation Program Manager
Beaufort County Engineering
100 Ribaut Road
Beaufort, SC 29902
Re: US 21 Corridor Study
Master Service Agreement 051922E
2023 OnCall Transportation Engineering Services (Design)
HDR pursuit # 10367088 / / MSA -HDR #10004353
Dear Ms. Bishop:
HDR Engineering, Inc. of the Carolinas (HDR) appreciates this opportunity to provide Beaufort County
with a proposal to provide engineering and planning services associated with the US 21 Corridor Study.
Based on the scope of services, questions, deliverables, and schedule outlined below, HDR will collect
and review existing conditions data, complete an alternatives assessment, and develop short - and long-
term recommendations for the corridor.
The Scope of Services is outlined below:
PURPOSE
Beaufort County is conducting a multi-modal Corridor Planning Study of the US 21 corridor from US 17 to
Neil Road, to plan for future growth, evaluate safety, analyze access management opportunities, and to
prepare short-term and long-term improvement recommendations. For this exhibit, HDR, Engineering,
Inc. of the Carolinas will be referred to as the CONSULTANT, and the US 21 Corridor Study will be
referred to as the PROJECT. Beaufort County, SC will be referred to as the CLIENT.
1. PROJECT MANAGEMENT
1.1. ACCOUNTING AND MANAGEMENT
Monthly invoicing will be prepared by the CONSULTANT and submitted to the CLIENT with the
amount determined based on the percentage of each task completed. A final invoice will be
provided to the CLIENT within 60 days from final acceptance of work .
DocuSign Envelope ID: 4CDA402E-31C3-4AC9-80EB-9A459FBEEE13
28
Item 14.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
1.2. PROGRESS MEETINGS
Progress Meetings will be held throughout the life of the study. It is anticipated bi -weekly progress
meetings (expected 30 minutes) will be held virtually for a total of no more than 24 meetings. The
CLIENT will lead these meetings.
2. EXISTING CONDITIONS
2.1. PUBLIC PARTICIPATION
The CONSULTANT will develop quality educational materials that the CLIENT will show with
results of the PROJECT to the general public and stakeholders. The CLIENT will handle all
public outreach related to the PROJECT with minor support from the CONSULTANT.
2.2. DATA COLLECTION AND ANALYSIS
The CONSULTANT shall collect, review, and analyze the data necessary to conduct this
PROJECT. Upon receiving notice-to-proceed, the CONSULTANT will provide a list of data
needs to be provided by the County as available, which will include a wide variety of data items
across all modes of travel as well as other supporting data (e.g. land-use and development
proposals) covering daily and/or peak hour traffic flow data, crash data with latitude/longitude
information, geometric data, transit data, multimodal data, LATS model outputs and prior County
transportation studies, land use, models/model data for other communities, database lists to
include GIS shapefiles, signal timing and existing Synchro files, pavement quality index data,
existing paving financials/budgets, and any other asset condition or inventory data related to
existing signal communications, interconnects and infrastructure. The Project Team members
will help facilitate the gathering of this data. This could include providing the data directly or
providing the necessary contact information. Publicly available data (such as Census data) may
be obtained directly by the CONSULTANT, though locally updated or modified versions of
publicly available data will be requested from the agencies. This scope anticipates that the
majority of the data requested will be readily available from the County or other agencies, in
electronic formats. The CONSULTANT will consider key opportunities and constraints related to
existing and future conditions.
2.3. SAFETY AND SPEED ASSESSMENT
The CONSULTANT shall review the crash history for the most recently available five (5) years,
summarize the identified crash patterns and elevated crash locations, and id entify short and
long-term safety improvement strategies. The identification of potential safety improvements will
also include analyzing driveways and access management issues that should be considered in
the development of the concept plans. Improvements to be considered include, but are not
limited to, closing medians with landscaping to limit turning movements and locating future
openings. Corridor speeds will be evaluated based on available data from the CLIENT.
The crash analysis will consist of a review of crash reports for the corridor and an evaluation of
any observed trends or other relevant observations that will aid in recommendations
development. It is assumed that the CLIENT will provide crash data that includes accurate
latitude and longitude coordinates for mapping purposes.
DocuSign Envelope ID: 4CDA402E-31C3-4AC9-80EB-9A459FBEEE13
29
Item 14.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
The safety assessment will include a planning level multi-modal evaluation of the existing
transportation system along the corridor. This assessment is expected to cover mobility, safety,
connectivity, demand, land-use, and infrastructure/operations (i.e. pedestrian, bicycle, transit,
auto & truck), to identify areas in need of safety improvements and existing gaps in coverage
and connectivity between modes. This multi-modal evaluation is dependent upon the extent of
data available.
2.4. EXISTING TRAFFIC ANALYSIS
The CONSULTANT will examine available count data and the LATS travel demand model
outputs for verification purposes. Count data will also be used to evaluate existing intersection
operations using HCM 2010 methodology. It is anticipated that a certain amou nt of additional
data will be needed to have an adequate base from which to work, so the CONSULTANT will
perform peak hour, typical weekday intersection counts for up to sixteen (16) locations. Count
locations will be determined with coordination between the CONSULTANT and CLIENT Staff
and will include locations selected by the County and locations determined to be potential
candidates for short- and/or long-term modifications.
Key Intersections Include:
Washington Farm Road (aka Farm Road on Google Earth)
Keans Neck Road
Morgan Road
Seabrook Road & Stuart Point Road
Martin Lane
Detour Road & Garrett Small Road
Claredon Road & Bruck K Smalls Drive
Poppy Hill Road
Parker Drive
Shanklin Road
Laurel Bay Road & Geiger Boulevard (and Spanish Moss Trail)
Roseida Road
Parris Island Gateway
Broad River Boulevard
Neil Road
The CONSULTANT will develop base-year AM and PM Synchro (v11.0 or higher) models for
locations listed above. Signal timings are to be provided by the CLIENT. The CLIENT will also
provide the CONSULTANT with existing Synchro files for any intersections/corridors within the
study area. AM and PM Level of Service (LOS) will be evaluated using HCM Seventh Edition
methodology for each intersection. The CONSULTANT will estimate an annual traffic volume
growth rate based on historical volume data via SCDOT and utilize it to calculate a projected
future year no-build analysis. These future year projections will be compared to the LATS model
outputs to verify alignment with regional forecasts.
The CONSULTANT will review, with input and information provided by the CLIENT as available,
the conditions of the existing signal infrastructure in the study area. This review will consist, as
available, of mapped existing signal locations (if data is available), the locations (if available) of
upgraded signal cabinets/equipment, the location of any areas/corridors currently under signal
coordination and the communication method(s) employed, and the location(s) of any significant
DocuSign Envelope ID: 4CDA402E-31C3-4AC9-80EB-9A459FBEEE13
30
Item 14.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
timing/retiming efforts made in the last five (5) years. The CONSULTANT will evaluate current
infrastructure upgrade efforts for incorporation of recommended asset plans.
2.5. MAPPING
The CONSULTANT shall develop maps needed to screen and evaluate the study area. All
existing conditions and maps identified above are subject to availability of data either from the
CLIENT or other sources. This task does not include collecting original data, traffic/user counts,
or performing new inventories.
2.6. GOALS, VISION, AND POTENTIAL DESIGN STRATEGIES
The CONSULTANT shall define unique context areas and develop corresponding visions and
goals based on Tasks 2.1 – 2.5 as well as discussion with CLIENT staff. These will help identify
potential design strategies, example projects, and best practices for corridor improv ements.
Deliverables: Analysis Mapping and Summarization Documentation
3. ALTERNATIVES ASSESSMENT
This section describes the process of developing and evaluating alternatives based on engineering,
environmental, public and agencies input, as well as other factors.
3.1. CRITICAL/TYPICAL SECTIONS AND INTERSECTION ALTERNATIVES
Up to two (2) existing typical sections and up to six (6) proposed Sketchup critical / typical
sections will be developed based on the context areas, vision and goals defined in Task 2.
Intersection design strategies and alternatives will also be developed at key intersections.
3.2. PLANNING LEVEL OPINION OF PROBABLY COSTS
The CONSULTANT shall develop planning level costs for each viable alternative developed. The
cost will be comprised of design, right-of-way and construction costs only. Given the planning
level detail of the alternatives, costs will be developed based upon conceptual designs and
implementation of short- and long-term items. The cost for right-of-way needs will be based upon
estimated acreages of right-of-way and average property value in the area (individual parcel-
level right-of-way costs and business damages and relocations are not included). Planning level
costs are intended for providing a relative comparison between alternatives.
3.3. ALTERNATIVES EVALUATION
After developing the alternatives, the CONSULTANT will prepare a matrix comparing the
quantitative and qualitative benefits, impacts, and costs of the alternatives.
3.4. PUBLIC MEETINGS
The CONSULTANT will develop educational materials about the PROJECT for CLIENT use. The
CLIENT will be responsible for printing and mailing all advertising and materials. The CLIENT is
not anticipating CONSULTANT participation in any public meetings.
DocuSign Envelope ID: 4CDA402E-31C3-4AC9-80EB-9A459FBEEE13
31
Item 14.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
3.5. ALTERNATIVES ASSESSMENT DOCUMENTATION
The CONSULTANT will prepare and submit the Alternatives Assessment. This memo will
include a preliminary recommendation based on the input from the public and project visioning
team. The assessment will also document and classify components of the alternatives into two
different horizon times, including short-term (implementation in ten years or less), and long term
(implementation in 11 or more).
Deliverables: Alternatives Assessment Memo
4. CONCEPT DEVELOPMENT & FINAL DOCUMENTATION
4.1. SHORT TERM SOLUTIONS DEVELOPMENT & CONCEPT DESIGN
Based on evaluation of collected data, the CONSULTANT will map existing corridor link and
intersection capacity issues, along with level of service (LOS) and crash patterns within the
existing network, and will create a prioritized list of potential improvements. The CONSULTANT
will work from land use assumptions based on collected data.
The CONSULTANT will evaluate opportunities to improve upon current or short -term
deficiencies in the corridor. Example short-term project types include access management to
improve safety and/or increase capacity, improving safety at intersections, and minor
intersection improvements such as roundabouts and improving intersection capacity. The
CONSULTANT will develop a narrative and supporting conceptual designs and typical sections
suggesting adaptations based on current national guidelines and best practices. The approach
for the alignments is to avoid the need for additional right-of-way. However, if locations requiring
additional right-of-way are needed to accommodate the proposed alternative improvements, they
will be identified. This identification will only include an approximate representation of the needed
additional right-of-way and does not include a sketch and description, survey, or other legal
document to be used for the legal acquisition process. Capacity improvements will be evaluated
against a design-year No Build LOS to quantify the magnitude of improvement. Capacity
analysis will be conducted using Synchro v11.0 or higher and will make use of HCM 2010
methodology.
The CONSULTANT will identify opportunities, where feasible, for multimodal infrastructure,
developing a narrative on a series of best practices especially in regards to the Spanish Moss
Trail. The CONSULTANT will evaluate opportunities for ITS improvements/expansion and/or
implementation, including adaptive signal systems and wireless communication (i.e. signal
interconnect and/or synchronization), along with short-term opportunities for the CLIENT to
prepare for, and implement, “smart-city” technology (i.e. to include signal system network
improvements and 5G connectivity). The CONSULTANT will evaluate opportunities to improve
access and mobility for bicyclists and pedestrians. Opportunities are anticipated to primarily
focus on pedestrian and trail crosswalks at intersections, mid-block locations and driveways, and
filling in gaps in existing bicycle and pedestrian networks, where feasible.
4.2. LONG TERM SOLUTIONS DEVELOPMENT
The CONSULTANT will identify long-term needs across all modes and address major user
groups (commuters, local residents, visitors, deliveries, etc.) The identified issues and needs will
take into account input from the CLIENT, other stakeholders, and the public as available.
DocuSign Envelope ID: 4CDA402E-31C3-4AC9-80EB-9A459FBEEE13
32
Item 14.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
Combined with the project goals and objectives they will guide the CONSULTANT in developing
and then evaluating a range of potential multimodal improvement alternatives. Possible
improvements will address all modes. This could include circulation network upgrades, roadway
reconfigurations, multi-modal corridor improvements, regional access, sidewalks, shared-use
paths, parking improvements, and wayfinding elements.
The CONSULTANT will identify, through coordination with the CLIENT, up to three (3)
intersections where the CONSULTANT will conduct a design-year Synchro analysis to identify
potential long-term solutions to current or anticipated future needs. The solutions will consist of
concept layouts of up to two (2) alternatives for each intersection. Solutions could include
intersection realignments, capacity improvements, safety improvements, or improvements to
accommodate anticipated growth.
The CONSULTANT will develop a list of long-term roadway projects intended to improve safety,
capacity, and mobility. Long-term project examples include, new roadway alignments, traditional
or innovative widening projects, and new/modified intersections. As noted above, the
CONSULTANT will conduct a detailed capacity analysis for up to three (3) of these locations to
select a preferred alternative based on benefits as identified by the project goals.
4.3. ROLL PLOT(S)
Up to two (2) roll plots will be developed for use by the CLIENT covering the extents of the
preferred alternatives on a scaled, aerial map identifying the apparent right-of-way and parcel
boundaries as represented on existing GIS information, property appraiser data, and other
records provided by the CLIENT.
Each roll plot will be up to 8 feet long by up to 3 feet wide.
4.3.1. VISUALIZATIONS AND PLACEMAKING STRATEGIES
Up to two (2) 2-D or 3-D visualizations/renderings of key locations and/or intersections will
be developed to help visualize the preferred concept. The CONSULTANT may visit the field
to obtain necessary photos to support the development of the visualizations from specific
viewpoints. These visualizations will help to show more than the roadway featu res - they will
highlight placemaking opportunities and potential landscaping and hardscaping
improvements to be included in key areas.
4.3.2. CONCEPT LEVEL OPINION OF PROBABLE COST
The CONSULTANT shall develop a concept level cost for the concept plan. The cost will be
comprised of design, right-of-way, and construction costs only. Costs will be developed
based upon SCDOT Basis of Estimates. The cost for right-of-way needs will be based upon
estimated acreages of right-of-way and average property value in the area (individual
parcel-level right-of-way costs are not included).
4.3.3. IMPLEMENTATION STRATEGIES
The CONSULTANT will assess the priority, segmentation, and appropriate next steps for
the project. Additional study recommendations, such as those pertaining to land use or
transit, will also be summarized.
DocuSign Envelope ID: 4CDA402E-31C3-4AC9-80EB-9A459FBEEE13
33
Item 14.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
4.3.4. FINAL DOCUMENTATION
The CONSULTANT will compile a draft final report and a final report inclusive of previous
tasks.
Deliverables: Final Documentation
SCHEDULE
This study has an estimated duration of twelve (12) months from Notice to Proceed (NTP) for completion
of the project. Short term solutions at the US 21/Laurel Bay intersection will be evaluated within the first
three months.
FEE
HDR proposes to perform the tasks described in this proposal as outlined belo w:
Task 1 $19,398.42 (102 manhours)
Task 2 $74,162.33 (412 manhours)
Task 3 $48,340.03 (352 manhours)
Task 4 $56,274.60 (426 manhours)
Total $198,175.38 (1,292 manhours)
Once again, HDR appreciates this opportunity to provide assistance to the Beaufort County. We look
forward to working with you on this project. Please call 803-509-6626 with any questions or comments
you may have.
Sincerely,
HDR ENGINEERING, INC. OF THE CAROLINAS
__________________________
Phillip Hutcherson, P.E.
Project Manager
________________________
Jonathan Henderson, P.E. VP
South Atlantic Area Manager
DocuSign Envelope ID: 4CDA402E-31C3-4AC9-80EB-9A459FBEEE13
34
Item 14.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommend Approval of a Resolution to Use Impact Fees to Retain HDR Engineering, Inc to study,
recommend, and design enhancements to Bluffton Parkway pedestrian accommodations and
aesthetics aka Bluffton Parkway Enhancement Project ($259,954.84)
MEETING NAME AND DATE:
Public Facilities and Safety Committee – May 22, 2023
PRESENTER INFORMATION:
Jared Fralix, PE – ACA Infrastructure Division
Eric Claussen, PE, PTOE – Director of Engineering, Alternative
(5 mins)
ITEM BACKGROUND:
HDR Engineering, INC is one of the award firms for Beaufort County’s On -Call Transportation
Engineering Services RFQ#051922E and was asked to provide a scope and fee for a project to enhance
Bluffton Parkway between River Ridge Drive and Hampton Parkway.
PROJECT / ITEM NARRATIVE:
HDR will provide recommendations for enhancements to the Bluffton Parkway pedestrian
accommodations and aestheti cs. These enhancements include but are not limited to street and
pathway lighting, enhanced street signs, wider multi-use pathways, and corridor landscaping. HDR will
investigate design options, develop construction plans, and create the necessary bid documents that
will be required for construction.
FISCAL IMPACT:
The contract fee is $236,322.58. Staff recommends a 10% contingency of $ 23,632.26, bringing the
project’s total cost to $259,954.84. The funding for this project is South of the Broad Impact Fees for
Professional Services – account 23020011-51160 with a balance of $3,298,434.29.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award the contract for the Bluffton Parkway Enhancement Project to
HDR Engineering, INC.
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny Resolution authorizing the use of impact fees t o retain HDR to work on the
Bluffton Parkway Enhancement Project.
Next Step: Move forward to County Council to approve/deny the Resolution
35
Item 15.
RESOLUTION 2023/______
A RESOLUTION TO APPROVE THE USE OF TRANSPORTATION IMPACT FEES
TO RETAIN HDR, INC. TO STUDY, RECOMMEND, AND DESIGN ENHANCEMENTS
TO BLUFFTON PARKWAY PEDESTRIAN ACCOMODATIONS AND AESTHETICS
WHEREAS, Bluffton Parkway is heavily used by both pedestrians and motorists; and
WHEREAS, the County desires to initiate a study of the existing and future use of the
parkway by both pedestrians and motorists for the purpose of better accommodating and enhancing
the experiences of both by establi shing a project called the Bluffton Parkway Enhancement
Project; and
WHEREAS, the County wishes to retain HDR, Inc. to perform the study , to make
recommendations to the County, and to design the enhancements . HDR has submitted a contract
fee of $236,322.58 for the work. The County recommends a ten percent contingency fee
($23,633,26) for a total of $259,954.84; and
WHEREAS, the County collects development impact fees in accordance with state law
and Beaufort County Code of Ordinances, Chapter 82 - Impact Fees, for purposes such as the
Bluffton Parkway Enhancement Project study and recommendations; and
WHEREAS, the County has a sufficient balance in the Road Facilities – Southern Beaufort
County Service Area to pay for the projected expenses which are associated with the study.
NOW, THEREFORE, BE IT RESOLVED, that County Council hereby approves the
expenditure of $259,954.84 of road impact fees from the South of the Broad Service Area to retain
HDR, Inc to study, recommend, and design enhancements to Bluffton Parkway Pedestrian
Accommodations and aesthetics (Bluffton Parkway Enhancement Project).
This Resolution shall be effective _______ day of ____________, 2023.
Dated this _____ day of ____________, 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
_______________________________________
Joseph F. Passiment
Attest:
_____________________________
Sarah W. Brock, Clerk to Council
36
Item 15.
hdrinc.com
1201 Main Street, Suite 801, Columbia, SC 29201
April 25, 2023
Brittanee Bishop
Transportation Program Manager
Beaufort County Engineering
100 Ribaut Road
Beaufort, SC 29902
Re: Bluffton Parkway Enhancement Project
Master Service Agreement 051922E
2023 OnCall Transportation Engineering Services (Design)
HDR pursuit# 10367039 / MSA -HDR #10004353
Dear Ms. Bishop:
HDR Engineering, Inc. of the Carolinas (HDR) appreciates this opportunity to provide Beaufort County
with a proposal to provide engineering services associated with the Bluffton Parkway Enhancement
Project. Based on the scope of services, deliverables and schedule outlined below, HDR will survey the
project, create alternative concepts to review, and develop engineering plans for construction.
The Scope of Services is outlined below:
PURPOSE
Beaufort County wishes to construct enhancements to the Bluffton Parkway pedestrian pathway for
approximately 3000’ from River Ridge Road to Hampton Parkway (see Figure 1). Beaufort County has
funding available for use on the project for pedestrian accommodations and aesthetic enhancements.
These enhancements include but are not limited to lighting, enhanced street signs, and landscaping.
HDR will investigate design options, develop construction plans, and create the necessary bid
documents that will be required for construction. For this exhibit, HDR Engineering, Inc. of the
Carolinas will be referred to as the CONSULTANT, Andrews Engineering will be referred to as the
SUBCONSULTANT, the Bluffton Parkway Enhancement Project will be referred to as the PROJECT,
and Beaufort County, SC will be referred to as the CLIENT.
DocuSign Envelope ID: 689C06A0-1523-456F-B8EF-4A0E54D7D537
37
Item 15.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
Figure 1 - Project Location
SCOPE
The project area will be analyzed and studied by the CONSULTANT. Alternative improvements and
enhancements in the corridor will be researched and considered utilizing Beaufort County input and
criteria. Enhancements to be considered for this project will include alternative pathway configurations,
land scaping, pavement markings and signing, lighting design considerations. The tasks included in
this study will include the following:
Project Management
Surveys
Alternative Research and Concept Plan Development
Construction Plans and Specifications
Project Permitting
Display Graphics
Bid Documents
1. PROJECT MANAGEMENT
The CONSULTANT will coordinate with the CLIENT to prepare a schedule for the proposed project.
Coordination meetings will be monthly as needed and will be held virtually. The CONSULTANT will
coordinate with the CLIENT for any specific design standards. The CONSULTANT will coordinate with
the subconsultant Andrews Engineering (SUBCONSULTANT) for survey needs.
DocuSign Envelope ID: 689C06A0-1523-456F-B8EF-4A0E54D7D537
38
Item 15.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
1.1. ACCOUNTING AND MANAGEMENT
Monthly invoicing will be prepared by the CONSULTANT and submitted to the CLIENT with
the amount determined based on the percentage of each task completed. A final invoice will
be provided to the CLIENT within 60 days from final acceptance of work.
1.2. COORDINATION AND PROGRESS MEETINGS
Progress Meetings will be held throughout the life of the study. It is anticipated bi -weekly
progress meetings (expected 30 minutes) will be held virtually for a total of no more than 24
meetings. The CLIENT will lead these meetings.
2. SURVEYS
During this task, the SUBCONSULTANT will perform a limited topographic survey of the site to
determine key areas of design controls and limits. The purpose of this survey is to collect d ata and
information regarding the existing conditions of the site including existing elevations, horizontal
clearances, offsets, and right -of-way verification. Surveys performed will be utilized for the concept
and final construction plans. Features that will be surveyed include:
Boundary monuments
Existing curb & gutter and asphalt shared pathway locations
Existing structures and related above ground improvements
Marked Underground Utilities (as marked by SC811 only)
Above ground utilities
Group timber lines in wooded areas and individual trees non-wooded areas
Specimen tree survey
Drainage channels, ditches, swales, creeks, streams, ponds, etc.
Drainage pipes
Deliverables:
2.1. One (1) digital copy of Planimetric survey data (2D) in Microstation format.
2.2. One (1) digital copy of Topographic Breakline data (3D) in Microstation format.
2.3. One (1) digital copy of Digital Terrain Model in Microstation format.
2.4. One (1) Specimen Tree Survey
3. ALTERNATIVES RESEARCH AND CONCEPT PLAN DEVELOPMENT
The CONSULTANT shall prepare enhancement and conceptual layouts for the alternatives to illustrate
significant design features of the project. These concepts will consist primarily of technical options, roll
plots displaying options and locations along the corridor, typical sections and cross sections only
where needed. Conceptual cost estimates will be completed for each enhancement. Prior to beginning
DocuSign Envelope ID: 689C06A0-1523-456F-B8EF-4A0E54D7D537
39
Item 15.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
the design, the CONSULTANT shall submit detailed design criteria for approval by Beaufort County.
The CONSULTANT will prepare preliminary layouts for the project and will provide the layouts to
Beaufort County for review. The proposed design may include:
10’ pathway on southside of the Bluffton Parkway with low level lighting options
12’ pathway on northside of the Bluffton Parkway with high lighting options
Enhanced crosswalk areas (pavement markings, stamped pavement)
Lighting improvements (wide lighting, street signs, posts, banner arms, etc.)
Aesthetic street name signs or back lighted street name signs
Aesthetic signs posts
Bicycle maintenance stations
Landscape architecture
Deliverables:
3.1. One (1) PDF of Concept Alternatives (enhancement options, roll plots, typical sections, cross
sections)
3.2. One (1) preliminary cost estimate
4. CONSTRUCTION PLANS AND SPECIFICATIONS
Upon approval of concept plans from CLIENT, construction Plans will be developed to establish the
location of shared use pathways and enhancements. The scale that will be used for the site layout
plans shall be 1” = 20’. The CONSULTANT will final ize the stormwater design for the construction
plans in accordance with Beaufort County stormwater requirements. The site improvement plan shall
indicate the location of various proposed and existing site improvements and as a minimum shall
include:
North Arrow
Control points
Property Lines
Known Easements
Existing site conditions/utilities
Proposed layout plan including pathway enhancements, stormwater features, construction
details, and utilities
Erosion control plans based on Beaufort County and SCDHEC requirements
Details and specifications for construction
Proposed construction item quantities
DocuSign Envelope ID: 689C06A0-1523-456F-B8EF-4A0E54D7D537
40
Item 15.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
The CONSULTANT will create a final Engineer’s Cost Estimate for the proposed improvements
following final plan approval.
Deliverables:
4.1. One (1) full size to scale PDF of Final Construction plans
4.2. One (1) Cost Estimate for Final Construction Plans
4.3. One (1) electronic PDF and one (1) electronic Microsoft Word copy of Special Provisions
4.4. One (1) PDF of design and quantity calculations
5. PROJECT PERMITTING
The proposed project will require a Land Disturbance Permit through the South Carolina Department
of Health and Environmental Control. A tree permit from COUNTY will also be submitted if necessary.
The CONSULTANT will coordinate with the COUNTY arborist on disposal/rel ocating of the existing
landscaped trees. The CONSULTANT will prepare the necessary permit applications on behalf of
Beaufort County based on the construction plans. The CONSULTANT will coordinate as needed
throughout the permit review process.
The CONSULTANT will perform a wetland delineation and prepare the appropriate documentation in
support of an “accurate-preliminary” jurisdictional determination (JD) from the Charleston District Army
Corps of Engineers (USACE). The CONSULTANT will conduct field v isits as necessary to confirm
the presence of wetlands and streams within a defined project study area. Upon completion of the
wetland delineation, a JD request for an “accurate-preliminary JD” will be prepared and submitted to
the USACE. For the purposes of this proposal, it is assumed that no additional wetland impacts will
need to be permitted for these improvements. If additional permits are required, it will be considered
additional services and billed at an hourly rate.
Deliverables:
5.1. SCDHEC Land Disturbance Permit Application package
5.2. Two hardcopies, 1 electronic PDF copy JD Request Package
5.3. Beaufort County tree permit (if necessary)
6. DISPLAY GRAPHICS
The CONSULTANT will develop up to three associated 3D -Renderings for selected aesthetics to be
included with the project.
Deliverables:
6.1. Sketches and renderings for the project.
DocuSign Envelope ID: 689C06A0-1523-456F-B8EF-4A0E54D7D537
41
Item 15.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
7. BID DOCUMENTS
The CONSULTANT will create the Project’s contract documents in preparation of advertisement for
bid. HDR will develop construction quantities, standards, and technical specifications. HDR will use
established criteria and specifications from the SCDOT for consistency and quality of materials to be
used on the project. These bid documents will be provided to Beaufort County prior to advertisement
for review and approval. Received bids from contractors will be reviewed and checked for accuracy.
A contractor recommendation will be made by the CLIENT after the bids are reviewed. Necessary
construction conferences will be attended by the CONSULTANT. These meetings include the pre-bid
conference and the pre-construction conference.
Deliverables:
7.1. One (1) full size to scale PDF of Final Bid Documents including:
7.2. One (1) PDF of Standard Specifications
7.3. One (1) PDF of Special Provisions
7.4. One (1) PDF of Unit Bid Tab Quantities
SERVICES OF THE COUNTY
In order to complete this project, Beaufort County agrees to provide the following if necessary:
Access to the project site to perform studies, inspections, etc.
Project representative to respond to questions or inquiries during the progression of the
project.
Pre-existing data including as-built plans, in hard copy and electronic format, as well as GIS
information necessary for design of the project.
Right-of-way acquisition (New Right-of-way, Easements, and/or Permissions) as necessary
Utility Coordination as necessary.
SCHEDULE
This project has an estimated duration of eight (8) months from Notice to Proceed (NTP) for completion
of the project.
DocuSign Envelope ID: 689C06A0-1523-456F-B8EF-4A0E54D7D537
42
Item 15.
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201
FEE
HDR proposes to perform the tasks described in this proposal as outlined below:
Task 1 $29,409.80 (152 manhours)
Task 2 $25,334.18 (16 manhours)
Task 3 $67,155.07 (408 manhours)
Task 4 $68,844.95 (464 manhours)
Task 5 $19,464.93 (146 manhours)
Task 6 $ 7,033.65 (49 manhours)
Task 7 $19,080.00 (100 manhours)
Total
$236,322.58 (1,335 manhours)
Once again, HDR appreciates this opportunity to provide assistance to the Beaufort County. We look
forward to working with you on this project. Please call 803-509-6626 with any questions or comments
you may have.
Sincerely,
HDR ENGINEERING, INC. OF THE CAROLINAS
__________________________
Phillip Hutcherson, P.E.
Project Manager
________________________
Jonathan Henderson, P.E. VP
South Atlantic Area Manager
DocuSign Envelope ID: 689C06A0-1523-456F-B8EF-4A0E54D7D537
43
Item 15.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of Award to Kimley Horn for the ITS Master Plan ($275,000.00)
MEETING NAME AND DATE:
Public Facilities and Safety Committee – May 22, 2023
PRESENTER INFORMATION:
Jared Fralix, PE – ACA Infrastructure Division
Eric Claussen, PE, PTOE – Director of Engineering, Alternative
(5 mins)
ITEM BACKGROUND:
Kimley Horn is one of the award firms for Beaufort County’s On -Call Traffic Engineering Services
RFQ#083021E and was asked to provide a scope and fee to the region’s Metropolitan Planning
Organizations (LATS) for an Intelligent Transportation Plan (ITS). The County will be cost-sharing in and
managing this project for LATS.
PROJECT / ITEM NARRATIVE:
The ITS Master Plan is an actionable plan on how to develop and undertake new ITS infrastructure
investments. The ITS Master plan shall have three phases: 2023-2025 Critical Needs; 2025 -2027:
Desired Improvements; and 2027-2033 10-Year Vision and Long-Range Plan. The Master Plan shall be
organized to provide action steps on how to achieve project goals, project phasing, probable costs, and
implement ITS architecture. Project recommendations will provide high-level device locations
correlated with fiber opt ic cable infrastructure to determine device grouping based on available
bandwidth, video latency constraints, device proximity, and high -level network architecture.
Preliminary recommended placement of distribution switches/routers and core/central routers will
also be made based on high-level network architecture.
FISCAL IMPACT:
The contract fee is $267,670. Staff recommends adding a contingency of $7,330 for a total of $275,000
to cover any overages . The funding for this project is an 80/20 split with LATS. Therefore, LATS is
responsible for $220,000 of the total cost and Beaufort County is responsible for $55,000. Beaufort
County’s contribution for this project is Capital Funds approved in the 2022/41 Budget Amendment
Ordinance – account 10401243-54500 with a balance of $4,353,958.64.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award the contract for the ITS Master Plan to Kimley Horn.
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny the recommendation to award the ITS Master Plan to Kimley Horn.
Next Step: Move forward to County Council to approve/deny the recommendation to award the ITS
Master Plan to Kimley Horn.
44
Item 16.
Page 1
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
April 13, 2023
Eric Claussen, PE, PTOE
Director of Engineering
Beaufort County Engineering
PO Drawer 1228
Beaufort, SC 29901
RE: Professional Services Proposal for Beaufort County ITS Masterplan– Beaufort County,
South Carolina
Eric,
Kimley-Horn and Associates, Inc. (“Kimley-Horn” or “the Consultant”) is pleased to submit this letter
proposal (the “Proposal”) to Beaufort County (“the Client”) for providing transportation and ITS
engineering services related to the Beaufort County ITS Masterplan. Our project understanding,
scope of services, schedule, and fee are described below.
PROJECT UNDERSTANDING
It is our understanding Beaufort County would like to implement an ITS Masterplan for the county. In
conjunction with LATS, the ITS Masterplan will also include portions of Jasper County. The ITS
Masterplan will include the following corridors:
1. US 278 from US 17 through Hilton Head – approximately 36 miles of roadway
2. SC 170 from US 21 to SC 46 – approximately 24 miles of roadway
3. SC 170 from US 17 to SC 315/SC 46- approximately 4 miles of roadway
4. SC 315 from US 17 to SC 46 – approximately 6 miles of roadway
5. SC 46 from US 17 to US 278 – approximately 17 miles of roadway
6. US 17 from SC 46 to SC/GA State line – approximately 14 miles of roadway
7. US 17 from Beaufort County Line to I-95 – approximately 14 miles of roadway
8. Argent Boulevard from US 278 to SC 170 – approximately 4 miles of roadway
9. SC 462 from SC 170 to Snake Road – approximately 3 miles of roadway
10. Bluffton Parkway from SC 170 to US 278 – approximately 11 miles of roadway
11. Buckwalter Parkway from US 278 to SC 46 – approximately 4 miles of roadway
12. US 21 from US 17 to Harbor River Bridge – approximately 28 miles of roadway
13. Ribaut Road from US 21 Business to US 21 – approximately 3 miles of roadway
14. Parris Island Gateway from US 21 Business to US 21 – approximately 4 miles of roadway
15. SC 128/US 28/Lady’s Island Drive from SC 170 to US 21- approximately 9 miles of roadway
45
Item 16.
Page 2
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
SCOPE OF SERVICES
TASK 1 PROJECT MANAGEMENT
Task 1.1 Project Administration
Project administration spans the duration of the project and is crucial to the success of the
project. This task involves the monitoring and coordination of services to be provided to Beaufort
County (“the County”) to achieve timely and efficient completion of the project. Included in this
task are the project control and management, reporting requirements, project status meetings,
and schedule development and maintenance.
Task 1.2 Project Control and Management
The Engineer will be responsible for the day-to-day activities of managing the Project, which is
assumed to have a duration of 12 months. Specific activities include ongoing reassessments of
contract and schedule adherence.
Task 1.3 Status Reports and Invoicing
Monthly status reports will be prepared and submitted to the County. The status reports will
contain a concise report of Project progress and contract fulfillment. The report will address
technical progress, contract progress, and management-related topics.
Task 1.4 Project Status Meetings
In addition to the reporting requirements outlined above, virtual project status meetings with the
County will help the Engineer maintain schedule and contract adherence. It is assumed that
project status meetings will be held once per month, by means of a virtual meeting.
Task 1.5 Schedule Development
The Engineer will develop a project schedule for review and approval by the County.
Task 1.6 Presentations to County Council
The Engineer will conduct up to two presentations to County Council. The first presentation will
present the recommended project approach and schedule. The second presentation, if
requested, would be focused on status update or findings.
The first workshop, ITS Vision and Needs Workshop, will focus on the development of the long-
term vision for transportation technology within the County. The second workshop, ITS
Recommendations Workshop, will focus on draft recommendations and project prioritization
methodology.
TASK 2 CONCEPT OF OPERATOINS
It is important to establish a solid platform that defines how the County operates today and how
the County would like to operate in the future. To establish this foundation, the Engineer will
develop the Concept of Operations (ConOps). The ConOps represents the County’s day-to-day
conditions and activities (operation) as they pertain to ITS system needs. It describes the
purpose, the environment in which it will be implemented and operated, how it will be used, roles
46
Item 16.
Page 3
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
and responsibilities of involved parties, and what capabilities the users need. More simply put, the
Concept of Operations attempts to answer the Who, What, When, Where, Why, and How for the
system in general terms. Kimley-Horn will conduct one workshop with LATS and Beaufort County
to go over the recommendations from the Concept of Operations. This task includes workshop
preparation, gathering workshop materials, and travel for the workshop.
Deliverables:
Concept of Operations Memo
Workshop with LATS and Beaufort County
TASK 3 EXISTING CONDITIONS AND ASSETS INVENTORY
The basis for the ITS Master Plan is to first develop current and accurate GIS inventory and
database of the County’s intelligent transportation infrastructure and assets, both internally and
externally. The County will provide to the Consultant with existing spreadsheets, GIS inventory,
or other forms of data of the existing infrastructure and assets. Assets that shall be incorporated
into the database include the traffic signal equipment, detection, cameras, fiber network (if
existing), and other traffic control devices (Blue Toad, vehicle approaching warning flashers,
radar speed feedback signs, rectangular rapid flashing beacons, school beacons, and others).
It is anticipated that the consultant will rely on the information provided by the County and will not
be responsible for field verification or field inventory. The consultant’s effort will be focused on
obtaining the existing asset inventory from various existing sources (i.e., spreadsheets, ATMS,
etc.), and consolidating into a single GIS inventory and associated database that is consistent
with the County’s other available inventories.
In addition to the County inventory, the Consultant shall document the central management
software and hardware and existing interconnectivity and interoperability with adjacent
jurisdictions and relevant state owned and maintained assets.
In addition, the consultant will work with the County to develop an ITS Asset Management
Process to clearly define the roles and responsibilities of key personnel who will maintain the
data. The consultant will summarize findings in an Existing Conditions Technical Report which will
be incorporated as a chapter into the final Master Plan document.
Kimley-Horn will conduct one workshop with LATS and Beaufort County to go over the results
from the Existing Conditions and Asset Inventory. This task includes workshop preparation,
gathering workshop materials, and travel for the workshop.
Deliverables:
GIS Database of assets inventory
Existing Conditions Technical Report
47
Item 16.
Page 4
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
TASK 4 NEEDS ASSESSMENT
The needs assessment should be divided into three focus areas: existing, planned and future.
For assessing existing needs, the Consultant shall evaluate the County’s current ITS inventory
and identify gaps in the system (communications, connections, interoperability, etc.). The future
needs assessment shall focus on how the county can achieve a robust communications plan and
connection of traffic control or monitoring devices as well as address ITS gaps. Future needs will
also include a county Traffic Management Center. The emerging technologies assessment shall
focus on what the counties needs to be planning for related to autonomous and connected
vehicles (is this a desire) as well as other emerging transportation technologies.A staffing plan
and layout of the Traffic Management Center would be an additional service to this Task.
The consultant will coordinate with the County to verify our current understanding of future
projects and develop assumptions regarding the number and location of future signalized
intersections and ITS devices, video transmission and display technologies, and center to center
connection needs. Additionally, the consultant will review vehicular traffic data, crash data
provided by the South Carolina Department of Public Safety, truck traffic data, demographics,
anticipated future projects, and growth metrics, as available, to analyze future system needs.
INRIX/RITS data will be used to portray congestion hot spots throughout the County. Weekday
(Tuesday, Wednesday, and Thursday) traffic during peak morning (6:00 AM to 9:00 AM) and
peak evening (4:00 PM to 6:00 PM) will be analyzed.
The consultant will look at device deployments and closely consider communication needs for
each focus area. The consultant will work with the County to identify emerging technology needs
based on the established vision.
The consultant will develop and then hold a meeting with the County to review the existing, future,
and emerging technology system demand. At this meeting the County will verify the data
gathered and assumptions made by the consultant prior to bandwidth analysis being performed.
The consultant will use the assumptions and capacity data gathered to determine current network
bandwidth deficiencies. Three-time horizons will be assessed: existing, future, and emerging. The
emerging technology bandwidth estimates will be a high-level expectation of what is known today
with an assumption of future growth. These bandwidth deficiencies will be expressed in number
of fibers consumed and digital throughput as appropriate. The demand estimates will be
compared to the capacity estimates determined under this task. The County’s current network
architecture will be evaluated based on the identified deployment needs as well as bandwidth
needs. The consultant will analyze the current network architecture and develop a plan to migrate
to a redundant communications network, which will be capable of supporting the identified needs.
The consultant will summarize findings in a Needs Assessment Technical Report which will be
incorporated as a chapter into the final Master Plan document.
Deliverables:
System Demand Need Meeting
Needs Assessment Technical Report
48
Item 16.
Page 5
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
TASK 5 ITS MASTER PLAN
The County’s expectation of an ITS Master Plan is an actionable plan on how to develop and
undertake new ITS infrastructure investments. The ITS Master plan shall have three phases:
2023-2025 Critical Needs; 2025-2027: Desired Improvements; and 2027-2033 10-Year Vision
and Long-Range Plan. The Master Plan shall be organized to provide action steps on how to
achieve project goals, project phasing, probable costs, and implement ITS architecture. Project
recommendations will provide high level device locations correlated with fiber optic cable
infrastructure to determine device grouping based on available bandwidth, video latency
constraints, device proximity, and high-level network architecture. Preliminary recommended
placement of distribution switches/routers and core/central routers will also be made based on
high-level network architecture.
The consultant will prepare high-level cost estimates for project recommendations. The
consultant will work with the County to develop a consistent methodology for prioritizing projects
that is data driven and easy to communicate to decision makers. Projects will be divided into
three phases: Critical Needs, Desired Improvements, and 10-Year Vision / Long-Range Plan. The
consultant will develop summaries of each phase recommendations that can be used as easy
reference. In addition, the Master Plan shall include elements for the County to maintain eligibility
for federal transportation funding for ITS/ATMS projects.
The consultant will develop project descriptions for up to 7 projects for inclusion or in
consideration of incorporation into the County’s Capital Improvement Program (CIP). Each project
will be uniquely identified with a title, description, basis for recommendation, and an estimated
construction cost.
Deliverables:
System Plan and Recommended projects in GIS
ITS Master Plan
TASK 6 ON-CALL SERVICES
This task is reserved for additional services not defined in the above-described services that are
deemed necessary by County staff. The scope of services performed under this task would be
mutually agreed upon by both parties and performed only after a written direction. All labor hours
would be reimbursed on an hourly rate schedule as reflected in Exhibit C. It is anticipated that no
additional expenses would be incurred. Any travel required would be combined with another task
activity identified above.
49
Item 16.
Page 6
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
Additional Services
The above scope of services was identified based upon the RFQ, the Engineer’s experience, several
working meetings with County staff. The Engineer can provide additional services for additional fee
upon request. The suggested additional services may include the following:
Field installation of Global Positioning Systems (GPS) Equipment
Optimized traffic signal timing is effective when the clocks in the traffic controller are all synchronized
to a common reference time. GPS clocks are a low-cost effective means to achieving synchronized
time. The Engineer can install County-purchased GPS clocks and configure the traffic signal
controller appropriately. Alternatively, the Engineer can provide instruction and demonstration to
County staff on this task is achieved.
Traffic Engineering
The Engineer can provide traffic engineering functions such as plan review related to proposed
developments, signal warrant analyses, traffic signal design, intersection geometric design
modifications.
SCHEDULE
We will provide our services as expeditiously as practicable to meet a mutually agreed upon schedule.
FEE AND BILLING
Lump sum fees will be invoiced monthly based upon the overall percentage of services performed.
Payment will be due within 25 days of your receipt of the invoice and should include the invoice
number and Kimley-Horn project number.
Kimley-Horn will perform the Scope of Services for the total lump sum fees below:
Task Fee
Task 1 – Project Management $59,760
Task 2 – Concept of Operations $50,910
Task 3 – Existing Conditions and Asset Inventory $34,710
Task 4 – Needs Assessment $46,890
Task 5 – ITS Master Plan $75,400
Total Lump Sum $267,670
Task 6 – On Call Services Hourly
50
Item 16.
Page 7
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
CLOSURE
In addition to the matters set forth herein, our Proposal shall include and be subject to, and only to, the
terms and conditions in the attached modified Standard Provisions, which are incorporated by
reference. As used in the modified Standard Provisions, the term "the Consultant" shall refer to Kimley-
Horn and Associates, Inc., and the term "the Client" shall refer to Beaufort County.
Kimley-Horn, in an effort to expedite invoices and reduce paper waste, offers its clients the option to
receive electronic invoices. These invoices come via email in an Adobe PDF format. We can also
provide a paper copy via regular mail if requested. Please select a billing method from the choices
below:
____Please email all invoices to ____________________@________.______.
____Please email invoices to ____________________@________.______ AND provide a hard copy
to the address listed above (please note below if it should be to some else’s attention or an alternative
address).
____Please ONLY provide a hardcopy invoice to the address listed above (please note below if it
should be to some else’s attention or an alternative address).
If you concur in all the foregoing and wish to direct us to proceed with the services, please have
authorized persons execute both copies of this Proposal in the spaces provided below, retain one copy,
and return the other to us. Fees and times stated in this Proposal are valid for sixty (60) days after the
date of this letter. We appreciate the opportunity to provide these services to you. Please contact me
if you have any questions.
51
Item 16.
Page 8
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
We appreciate the opportunity to provide these services to you. Please contact us if you have any
questions.
Very truly yours,
KIMLEY-HORN
By: Jonathan Guy, P.E., AICP, PTOE Dillon Turner, P.E., PTOE
Vice President Project Manager
Agreed to this day of , _______.
Beaufort County
SIGNED:
PRINTED NAME: _______________________
TITLE:_________________________________
Client’s Federal Tax ID: _______________________
Client’s Business License No.: __________________
Client’s Street Address: _______________________
_______________________
Attachment – Standard Provisions
52
Item 16.
ITS Masterplan Fee Proposal
Kimley-Horn Staff Hours & Fees
Project Manager/Senior Professional
II Professional Analyst
295.00$ 200.00$ 150.00$
Project Administration 30 20 0
Project Control and Management (12 Months) 40 45 0
Status Reports and Invoicing 10 0 10
project status meetings (4 to 6) 12 6 12
Schedule Development 8 2 8
Presentations to Council (2) 28 5 8
Task 1.1 Hours: 128 78 38
Task 1.1 Fees: 37,760.00$ 15,600.00$ 5,700.00$ 700.00$ 59,760.00$
59,760.00$
Project Manager/Senior Professional
II Professional Analyst
295.00$ 200.00$ 150.00$
Collect existing information 4 12 12
Conduct workshop 20 16 24
Draft ConOps Document 12 25 25
Meeting and notes 12 4 4
Final ConOps Document 20 24 28
Task 2 Hours: 68 81 93.0
Task 2 Fees: 20,060.00$ 16,200.00$ 13,950.00$ 700.00$ 50,910.00$
50,910.00$
Project Manager/Senior Professional
II Professional Analyst
295.00$ 200.00$ 150.00$
Identification of Existing System Assets 8 10 10
Workshop 20 16 24
Develop GIS Data Base 10 25 50
Task 3 Hours: 38 51 84
Task 3 Fees: 11,210.00$ 10,200.00$ 12,600.00$ 700.00$ 34,710.00$
34,710.00$
Project Manager/Senior Professional
II Professional Analyst
295.00$ 200.00$ 150.00$
Existing Needs Analysis 8 10 10
Future Needs Analysis 8 10 10
Emergining Needs Analysis 8 10 10
Create Draft and Final Needs Document 28 14 68
Meeting 10 8 12 700
INRIX $1,000
Task 3 Hours: 62 52 110
Task 3 Fees: 18,290.00$ 10,400.00$ 16,500.00$ 1,700.00$ 46,890.00$
46,890.00$
Project Manager/Senior Professional
II Professional Analyst
255.00$ 200.00$ 150.00$
ITS Masterplan Investment 20 10 20
Critical Needs 20 10 20
Desired IMP 20 10 20
Long Term 20 10 20
OPCC and Costs 20 30 60
CIP- 7 Projects 20 10 20
Task 3 Hours: 120 80 160
Task 3 Fees: 35,400.00$ 16,000.00$ 24,000.00$ -$ 75,400.00$
75,400.00$Kimley-Horn Fee:
Task 4 - Needs Document Expenses Task Fees
Kimley-Horn Fee:
Task 5 - ITS Masterplan Expenses Task Fees
Task 3 - Existing Conditions and Asset Inventory Expenses Task Fees
Kimley-Horn Fee:
Kimley-Horn Fee:
Task 2 - Concept of Operations Expenses Task Fees
Task 1 -Project Management Expenses Task Fees
Kimley-Horn Fee:
53
Item 16.
s
c/o Lowcountry Council of Governments
PO Box 98 634 Campground Road
Yemassee, South Carolina 29945
Main: 843.473.3990 Planning: 843.473.3958 Fax: 843.726.5165
www.lowcountrycog.org
May 18th, 2023
Eric Claussen, Director of Engineering
2266 Boundary Street
Beaufort, SC 29901
Re: Intelligent Transportation Systems (ITS) Regional Master Plan Guideshare Funding
Eric,
The Lowcounty Area Transportation Study (LATS) the designated Metropolitan Planning
Organization
for the Hilton Head – Bluffton urbanized area voted unanimously on December 2nd
2022 to allocate Federal Guideshare funds for an Intelligent Transportation System (ITS)
Regional Master Plan. The project is identified in the FY 2021-FY 20217 Transportation
Improvement Program (TIP) for the fiscal year 2023. The Transportation Improvement Program
(TIP) is the MPO’s short-range programming document and is a staged, multi-year listing of
surface transportation projects proposed for federal, state, and local funding within the
metropolitan area. The project is also included in the State TIP (STIP).
The total project cost is es�mated not to exceed $275,000. The approved LATS Federal
Guideshare funds cover 80% ($220,000) of the cost share while the local share must be at a
minimum equal to 20% ($55,000) of the total project cost.
If you have question please contact Stephanie Rossi, at srossi@lowcountrycog.org or (843) 473-
3958.
Thank you,
Stephanie Rossi
Planning Director
54
Item 16.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of contract award to Trinity Electrical for the HHI Air Traffic Control Tower technology
improvements in the amount of $268,695.00.
MEETING NAME AND DATE:
Public Facilities and Safety Committee – May 22, 2023
PRESENTER INFORMATION:
Steve Parry, Deputy Airports Director for Jon Rembold, Airports Director
5 minutes
ITEM BACKGROUND:
Trinity was the only company to submit a response to the RFP. Once submitted, the price was negotiated and
confirmed to be fair and reasonable on March 7, 2023. The Airports Board reviewed and recommended
approval of the contract award at its monthly meeting held April 20, 2023.
PROJECT / ITEM NARRATIVE:
HXD's Air Traffic Control Tower (ATCT) was completed in 2004. Since completion, few upgrades have been
made to the equipment used by the ATCT's contracted staff. In November of 2021, the Bipartisan
Infrastructure Law (BIL) was signed. The BIL provided a competitive grant opportunity for airports like HXD
that are part of the Federal Contract Tower Program. The Airport submitted a grant application and was
notified in August 2022 that it would be awarded a BIL grant in the amount of $275,000, 100% funded with no
local match required. The Airport then worked to develop an appropriate scope of work to match the funding
and worked with Purchasing to issue RFP# 010623. The initial response to the RFP was due Jan 6, 2023, then
extended to Jan 24, 2023. Trinity Electrical was the sole submitter and was able to provide the requested
equipment within the grant budget. The project upgrades and/or replaces outdated tower equipment,
improving ATCT staff’s ability to effectively and safely carry out their mission. The project is 100% grant
funded on a reimbursable basis (typical grant structure).
FISCAL IMPACT:
BIL - FAA Contact Tower Competitive Grant Program
100% grant funded (reimbursable)
STAFF RECOMMENDATIONS TO COUNCIL:
Approve contract award for the HHI Air Traffic Control Tower technology improvements to Trinity Electrical
OPTIONS FOR COUNCIL MOTION:
Motion to approve /deny contract award to Trinity Electrical for the HHI Air Traffic Control Tower
technology improvements in the amount of $268,695.00
Next step: County Council Meeting – June 12, 2023
55
Item 17.
REQUEST FOR PROPOSALS
Hilton Head Island Airport Air Traffic Control Tower
Equipment Upgrade
RFP # 010623
Prepared by: Procurement Services
Dated: December 5, 2022
Proposal Due Date: January 6, 2023, at 3:00PM (EST)
56
Item 17.
RFP #010623DOCUMENTS Page 1
COUNTY COUNCIL OF BEAUFORT COUNTY
PROCUREMENT SERVICES DEPARTMENT
106 Industrial Village Road, Bldg. 2 Post Office Drawer 1228
Beaufort, South Carolina 29901-1228
PROPOSAL NOTICE NO. RFP 010623
CLOSING DATE AND TIME: January 6, 2023, at 3:00PM (EST)
PROPOSAL TITLE: Hilton Head Island Airport Air Traffic Control Tower Equipment Upgrade
You are invited to submit a proposal, in accordance with the requirements of this solicitation which are
contained herein.
There will be a non-mandatory Pre-Proposal meeting held virtually on December 20, 2022, at 2:00pm.
Please contact Victoria Moyer at victoria.moyer@bcgov.net all vendors are encouraged to attend.
In order for your proposal to be considered, it must be submitted to the Procurement Services Department
no later than January 6, 2023, at 3:00PM (EST), at which time respondents to this request will be recorded
in the presence of one or more witnesses. RFP received by the Procurement Services Department after the
time specified will not be considered. Due to the possibility of negotiation with all respondents, the identity
of any respondents or the contents of any proposal shall not be public information until after the contract
award is made; therefore, the public is not invited to the proposal closing.
The proposal must be signed by an official authorized to bind the Consultant, and it shall contain a statement
to the effect that the proposal is firm for a period of at l east 90 days from the closing date for submission
of proposal. Proposal must be submitted through Vendor Registry by going to the County Website
at www.beaufortcountysc.gov
and register as a vendor. There is no cost t o register you company.
This will allow you to submit your RFP electronically.
All submittals (see Submission Requirements) received in response to this Request for Proposal will be
rated by a Selection Committee, based upon the Evaluation Form contained within this RFP . If the best
proposal respondent is clearly identified from the point summary, there will not be a need for oral
presentations. If not, then an oral presentation from a minimum of the top two rated firms shall be required.
This solicitation does not commit Beaufort County to award a contract, to pay any costs incurred in the
preparation of a proposal, or to procure or contract for the articles of goods or services. The County reserves
the right to accept or reject any or all proposals re ceived as a result of this request, to negotiate with all
qualified firms, or to cancel in part or in its entirety this solicitation, if it is in the best interests of the County
to do so.
“Original Signed”
Dave Thomas
Procurement Services Director
(843) 255-2304
57
Item 17.
RFP #010623DOCUMENTS Page 2
IMPORTANT ELECTRONIC SUBMITTAL INSTRUCTIONS
In order to do business with the Beaufort County, vendors must register with P rocurement
Services through our Vendor Registration system, powered by Vendor Registry. The County may
reject any quotes, bids, proposals, and qualifications submitted by businesses that are not
registered. Registering also allows businesses to identify the type of goods and services they provide
so that they may receive email notifications regarding relevant solicitations out for bid.
To register with the County, go to www.beaufortcountysc.gov and go to the Procurement Services
Department’s page and click on Vendor Registration. Once registered you may submit your
proposal through the solicitation section in Vendor Registry.
IMPORTANT
ELECTRONIC SUBMITTAL REQUIREMENTS
Response submittals for this Request for Proposal will ONLY be received electronically and must
be submitted ONLINE prior to the date and time listed on the cover page of this RFP document.
All responses must adhere to the following guidelines:
- Suppliers are encouraged to submit responses as soon as possible. Responses are received into a
‘lockbox’ folder and cannot be opened prior to the due date and time. The time and date of receipt
as recorded by the server will serve as the official time of receipt. The County is not responsible
for late submissions, regardless of the reason.
- All requested information and forms MUST be uploaded as one file if possible. If necessary
to have more than one upload, pricing, and signed acknowledgements, etc . are to be in the
first upload and the Pricing Information should be in the second, with each titled
accordingly. If you have a problem with your upload, you may contact Vendor Registry at
844-802-9202 or cservice@vendorregistry.com
58
Item 17.
RFP #010623DOCUMENTS Page 3
COUNTY COUNCIL OF BEAUFORT COUNTY
Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and Consultants
It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as “Beaufort County” or “the
County”, to comply with Title VI of the 1964 Civil Rights Act (Title VI) and its related statutes. To this end, Beaufort County
assures that no person shall be excluded from participation in, denied the benefit of, or subjected to discrimination under
any of its programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or language
regardless of whether those programs and activities are Federally funded or not. The County is also committed to assuring
every effort will be made to prevent the discrimination of low -income and minority populations as a result of any impact of
its programs or activities. Beaufort County also assures that every effort will be made to prevent discrimination through the
impacts of its programs, policies, and activities on minority and low -income populations. Additionally, the County will take
reasonable steps to provide meaningful access to services for persons with limited English proficiency. In addition, Beaufort
County will not retaliate against any person who complains of discrimination or who participates in an investigation of
discrimination. Beaufort County will, where necessary and appropriate, revise, update, and incorporate nondiscrimination
requirements into appropriate documents, directives, and regulations.
Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to
Prime Contractors, Subcontractors, Architects, Engineers, and Consultants, may not discriminate on the basis of race, color,
national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-
tier subcontractors may not discriminate in their election and retention of second- tier subcontractors, including those who
supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in
connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT)
and/or the Federal Highway Administration (FHWA).
In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County
to be performed under a subcontract, including procurements of materials or leases of equipment, each potential
subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under the contract and
the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability,
religion, or language by providing such a statement in its bidding and contract documents.
Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant
thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may
be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations,
orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails
or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort
County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance
with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may
determine to be appropriate, including, but not limited to:
• Withholding of payments to the Contractor under the contract until the Contractor complies, and/or
• Cancellation, termination, or suspension of the contract, in whole or in part.
In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of
this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests
of USDOT and FHWA. Additionally, the Contractor may request the United States to enter into such litigation to protect the
interests of the United States. Any person or Subcontractor who believes that they have been subjected to an unlawful
discriminatory practice under Title VI has a right to file a formal complaint within one hundred eighty (180) days following
the alleged discriminatory action. Any such complaint must be filed in writing or in person:
Beaufort County Government
Post Office Drawer 1228 Beaufort, SC 29901-1228
843-255-2304 Telephone E-mail: dthomas@bcgov.net
59
Item 17.
RFP #010623DOCUMENTS Page 4
PROJECT PURPOSE
Beaufort County requests proposals from all interested firms experienced in this type of work.
Hilton Head Island Airport is owned and operated by Beaufort County and is situated on approximately
175 acres on the northeastern end of Hilton Head Island, South Carolina. The airport operates a single,
5000’ runway with 2 parallel taxiways that support 3 commercial air carriers and a robust general aviation
community. The airport facilities include multiple sized rental hangars, an Index B Aircraft Rescue & Fire
Fighting (ARFF) facility, a commercial service terminal and an airport-owned Federal Contract Tower
(FCT).
The Air Traffic Control Tower (ATCT) was completed in 2004. Since completion, few upgrades have
been made to the equipment used by the contracted staff. This project seeks to upgrade and/or replace that
outdated equipment to improve the tower staff’s ability to effectively carry out their mission. The airport
will evaluate the proposals based on safety enhancement, equipment modernization and usability,
controller comfort, quality, and cost, and will select the proposer who offers the best value to the airport.
Specific scope items are outlined below. Some of these items require technical evaluation and
recommendations regarding upgrades and/or replacement.
SCOPE OF WORK
The following equipment is expected to be addressed in a Request for Proposal (RFP). All equipment
must meet applicable specifications and certifications. Warranty information and recommended
maintenance plans/best practices must be included in the response.
EQUIPMENT (List not exhaustive)
- Voice Switch/s
- Voice Recorders
- AWOS/ATIS interface equipment
- Light Control/s
- SmartATIS/LICOS/MET/CORE/Tools or like software
- Weather data and information equipment
- Media converters, Fiber if required for equipment
- Required media Computers/Screens and accessories
EQUIPMENT CONSOLE
- Remove existing cab console and equipment
- Replace with new console and related equipment
60
Item 17.
RFP #010623DOCUMENTS Page 5
PROPOSAL SUBMISSION INSTRUCTIONS
1. Electronically submit two separate files, Proposal and Price, to the Procurement Services Director
by using the Vendor Registry process through our County Website at www.beaufortcountysc.gov.
Both files must contain the Vendors name:
a. Proposal Submittal Contents (items #1-#6 on page 6).
2. Award information will be posted on Vendor Registry.
3. Prohibition of Gratuities: It shall be unethical for any person to offer, or give, or agree to give any
County employee or former County employee, or for any County employee or former County
employee to solicit, demand, accept, or agree to accept from another person, a gratuity or an offer
of employment in connection with any decision, approval, disapproval, recommendation, or
preparation of any part of a purchase request, influencing the content of any specification or
procurement standard, rendering of advice, investigation, auditing, or in any other advisory
capacity in any proceeding or application, request for ruling, determination, claim or controversy,
or other particular matter, pertaining to any program requirement or a contract or subcontract, or to
any solicitation or proposal therefore.
4. Questions
a. Submit questions you have, at least ten (10) calendar days prior to proposal closing date to
Vendor Registry
b. Answers to questions received that would change and/or clarify this solicitation will be
provided be posted on Vendor Registry as addendum.
c. Selection Committee members SHALL NOT be contacted during the RFP process.
5. In order to do business with the Beaufort County, vendors must register with Procurement
Services through our Vendor Registration system, powered by Vendor Registry. The County may
reject any quotes, bids, proposals, and qualifications submitted by businesses that are not
registered. Registering also allows businesses to identify the type of goods and services they
provide so that they may receive email notifications regarding relevant solicitations out for bid.
To register with the County, go to www.beaufortcountysc.gov
and go to the Procurement Services
Department’s page and click on Vendor Registration. Once registered you may submit your proposal
through the solicitation section in Vendor Registry.
61
Item 17.
RFP #010623DOCUMENTS Page 6
PROPOSAL SUBMITTAL CONTENTS
To achieve a uniform review process and allow for adequate comparability, the inform ation is to
be organized in the manner specified below and the entire package must not exceed 15 double -
sided printed pages excluding Exhibit A and B, cover pages and tabs.
1. Executive Summary: Objectives of the project, scope of work, and related issues which must be
addressed throughout development stages of the planning.
2. Approach to the Planning Process and Execution of the Work: Explanation of the planning and
completion the project as defined in the scope of work. The number of days proposed to complete
the project from issuance of Notice to Proceed.
3. Work Plan and Scheduling – A summary of tasks to be performed from evaluation of data through
County approval of the final plan. Include a timeline of key milestone dates to include overall
durations for each major task.
4. Experience and Qualifications: Experience and qualifications of the team members, with an
emphasis on similar type project completed within the last five (5) years. Provide an organization
chart including sub-consultants and contractors.
5. Pricing: Submit an itemized Schedule of Values to include the Grand Total.
6. List any exceptions, qualifications, or exclusions to this RFP:
ALL OTHER PAGES SHALL REMAIN PART OF THE RFP
BY REFERENCE AND IT IS NOT NECESSARY TO RETURN THESE ITEMS.
62
Item 17.
RFP #010623DOCUMENTS Page 7
Reserved Rights
The County shall not be responsible for any of the costs associated with responding to this request and all
submitted materials shall become the property of the County. Furthermore, the County expressly reserves
the right and options to:
- Reject any or all consultants and re-advertise if deemed necessary
- Waive any or all formalities and technicalities
- Approve, disapprove, or cancel all services associated with the project
The County has yet to decide whether to select one or more other firms to provide some or all of the
professional services described in this document. All selected firms will perform such services under the
direct supervision of the Beaufort County Engineer.
Selection & Notification
The selected firm will be given written notification of being selected by the County. This work may be
awarded in whole or in part at the sole discretion of the County. The County will negotiate and execute a
contract with the selected firm(s) prior to the beginning of the actual services. Should contract
negotiations fail, the County will negotiate with one or the other highly ranked firms. In general, the
contract will comply with applicable laws and standard provisions and shall contain the following terms:
- Detailed scope of services
- Schedule for providing services
- Cost of services
63
Item 17.
RFP #010623DOCUMENTS Page 8
CONTRACTUAL REQUIREMENTS
1.0 EXCUSABLE DELAY: The Contractor shall not be liable for any excess costs, if the failure to
perform the contract arises out of causes beyond the control and without the fault or negligence of
the Contractor. Such causes may include, but are not restricted to, acts of God or of the public
enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods,
epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather; but in
every case the failure to perform must be beyond the control and without the fault or negligence of
the Contractor. If the failure to perform is caused by the default of a subcontractor, and if such
default arises out of causes beyond the control of both the Contractor and the subcontractor, and
without the fault or negligence of either of them, the Contractor shall not be liable for any excess
costs for failure to perform, unless the supplies or services to be furnished by the subcontract or
were obtainable from other sources in sufficient time to permit the Contractor to meet the required
delivery schedule.
2.0 S.C. LAW CLAUSE: Upon award of a contract under this Request for PROPOSALS, the person,
partnership, association, or corporation to whom the award is made must comply with local and
State laws which require such person or entity to be authorized and/or licensed to do business in
Beaufort County. Notwithstanding the fact that applicable statutes may exempt or exclude the
successful offeror from requirements that it be authorized and/or licensed to do business in Beaufort
County, by submission of this signed Request for PROPOSALS the offeror agrees to subject itself
to the jurisdiction and process of the Fourteenth Judicial Circuit Court of Beaufort County, as to all
matters and disputes arising or to arise under the contract and the performance thereof including
any questions as to the liability for taxes, licenses, or fees levied by State or local government.
3.0 OFFEROR’S PROPOSALS: Offeror must, upon request of the County, furnish satisfactory
evidence of their ability to furnish products or services in accordance with the terms and conditions
of this Request for PROPOSALS. The P rocurement Services Department reserves the right to
make the final determination as to the offeror’s ability to provide the services requested herein,
before entering into any contract.
4.0 OFFEROR RESPONSIBILITY: Each offeror shall fully acquaint himself with conditions relating
to the scope and restrictions attending the execution of the work under the conditions of this Request
for PROPOSALS. It is expected that this will sometimes require on-site observation. The failure
or omission of an offeror to acquaint themselves with existing conditions shall in no way relieve
him of any obligation with respect to this Request for PROPOSALS or to the contract.
5.0 AFFIRMATIVE ACTION : The Contractor will take affirmative action in complying with all
Federal and State requirements concerning fair employment and employment of the handicapped
and concerning the treatment of all employees, without regard or discrimination by reason of race,
religion, sex, national origin, or physical handicap.
6.0 PRIME CONTRACTOR RESPONSIBILITIES: The Contractor will be r equired to assume sole
responsibility for the complete effort, as required by this RFP. The County will consider the
Contractor to be the sole point of contact with regard to contractual matters.
7.0 SUBCONTRACTING: If any part of the work covered by this RFP is to be subcontracted, the
Contractor shall identify the subcontracting organization and the contractual arrangements made
with same. All subcontractors must be approved, in writing by the County, or when applicable a
political subdivision within the County with the County’s concurrence. The successful offeror will
64
Item 17.
RFP #010623DOCUMENTS Page 9
also furnish the corporate or company name and the names of the officers of any subcontractors
engaged by the vendor. The County reserves the right to reject any or all subcontractors and require
substitution of a firm qualified to participate in the work as specified herein.
8.0 OWNERSHIP OF MATERIAL: Ownership of all data, material, and documentation originated and
prepared for the County pursuant to this contract shall belong exclusively to the County.
9.0 PERFORMANCE AND PAYMENT BONDS: The successful Contractor shall furnish, within ten
(10) days after written notice of acceptance of Request for PROPOSALS, Performance and
Payment Bonds. Contractor shall provide and pay the cost of a both bonds. The Bonds shall be in
the amount of one hundred percent (100%) the contract, issued by a Surety Company licensed in
South Carolina with an “A” minimum rating of performance as stated in the most current
publication of “Best’s Key Rating Guide, Property Liability” which shall show a financial strength
rating of at least five (5) times the Contract Price. The Bond shall be accompanied by a “Power of
Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the
bond.
10.0 NONRESIDENT TAXPAYERS: If the offeror is a South Carolina nonresident taxpayer and the
contract amount is $10,000.00 or more, the offeror acknowledges and understands that in the event
he is awarded a contract offeror shall submit a Nonresident Taxpayer Registration Affidavit (State
form #1-312-6/94), before a contract can be signed. Affidavit must certify that the nonresident
taxpayer is registered with the S.C. Department of Revenue or the S.C. Secretary of State’s Office,
in accordance with Section 12-9-310(A) (2) (3) of S.C. Code of Laws (1976) as amended.
11.0 BUSINESS LICENSE In accordance with the Beaufort County Business License Ordinance, 99-
36, Article III, as enacted November 22, 1999, any business or individual generating income in the
unincorporated area of B eaufort County is required to pay an annual lic ense fe e and obta in a
business l icense. The ordin ance refer enced is available on the Beaufo rt C ounty w ebsite a t
www.beaufortcountysc.gov or by calling the Busin ess License Administrator at (843) 255-2270
for a list of schedules.
12.0 ADDITIONAL ELIGIBILITY: Other Beaufort County Public Procurement units shall, at their
option, be eligible for use of any contracts awarded pursuant to this Invitation.
13.0 INSURANCE REQUIREMENTS: Prior to commencing work/delivery hereunder,
Contractor/Vendor, at his expense, shall furnish insurance certificat ion showing the certificate
holder as Beaufort County, P.O. Drawer 1228, Beaufort, SC 29901-1228, Attention: Procurement
Services Director and with a special notation naming Beaufort County as an additional insured on
the liability coverage. Minimum coverage shall be as follows:
(A) Worker’s Compensation Insurance - Contractor shall have and maintain, during the life of
this contract, Worker’s Compensation Insurance for his employees connected to the
work/delivery, in accordance with the Statutes of the State of South Carolina and any
applicable laws.
(B) C ommercial General Liability Insurance – Contractor shall have and maintain, during the
life of this contract, Commercial General Liability Insurance. Said Commercial General
Liability Policy shall contain Contractual Liability and Products/Completed Operations
Liability subject to the following minimum limits: $1,000,000 Each Occurrence/
65
Item 17.
RFP #010623DOCUMENTS Page 10
$2,000,000 General Aggregate and $2,000,000 Products/Completed Operations Aggregate
naming Beaufort County as an additional insured.
(C) Comprehensive Automobile Liability Insurance - The Contractor shall have and maintain,
during the life of this contract, Comprehensive Automobile Liability, including non-owned
and hired vehicle, of at least $500,000 COMBINED SINGLE LIMIT.
(D) ADDI TIONAL INSURANCE REQUIREMENT: Umbrella Liability Insurance –
Contractor shall have and maintain, during the life of this contract, Umbrella Liability
Insurance with a minimum limit of $2,000,000
(E) Professional Liability (Errors & Omissions) – The vendor shall maintain a limit no less
than $1,000,000 per occurrence.
(F) The required insurance policy at the time of issue must be written by a company licensed
to do business in the State of South Carolina and be acceptable to the County.
(G) The Contractor/vendor shall not cause any insurance to be canceled or permit any insurance
to lapse. All insurance policies shall contain a clause to the effect that the policy shall not
be canceled or reduced, restricted, or limited until fifteen (15) days after the County has
received written notice, as evidenced by return receipt of registered or certified l etter.
Certificates of
Insurance shall contain transcript from the proper office of the insurer, the location, and
the operations to which the insurance applies, the expiration date, and the above-mentioned
notice of cancellation clause.
(H) The information described above sets forth-minimum amounts and coverages and is not to
be construed in any way as a limitation on the Contractor’s liability.
14.0 INDEMNITY:
The Contractor hereby agrees to indemnify and save harmless the County, its officers, agents, and
employees from and against any and all liability, claims, demands, damages, fines, fees, expenses,
penalties, suits, proceedings, actions and cost of actions, including attorney’s fees for trial and on
appeal of any kind and nature arising or growing out of or in any way connected with the
performance of the Agreement, whether by act of omissions of the Contractor, its agents, servants,
employees or others, or because of or due to the mere existence of the Agreement between the
parties.
15.0 TERMINATION FOR DEFAULT:
15.1 The performance of Work under the Agreement may be terminated by the P rocurement
Services Director, in accordance with this clause, in whole or in part, in writing, whenever
the Director of Procurement Services shall determine that the Contractor has failed to meet
the performance requirements of this Agreement.
15.2 The Procurement Services Director has the right to terminate for default, if the Contractor
fails to make delivery of the supplies or perform the Work, or if the Contractor fails to
perform the Work within the time specified in the Agreement, or if the Contractor fails to
perform any other provisions of the Agreement.
16.0 TERMINATION FOR CONVENIENCE: The County may without cause terminate this contract
in whole or in part at any time for its convenience. In such instance, and adjustment shall be made
to the Contractor, for the reasonable costs of the work performed through the date of termination.
Termination costs do not include lost profits, consequential damages, delay damages, unabsorbed
66
Item 17.
RFP #010623DOCUMENTS Page 11
or under absorbed overhead of the Contractor or its subcontractors, and/or failure to include
termination for convenience clause into its subcontracts and mater ial purchase orders shall not
expose the County to liability for lost profits in conjunction with a termination for convenience
settlement or equitable adjustment. Contractor expressly waives any claims for lost profit or
consequential damages, delay damages, or indirect costs which may arise from the County’s
election to terminate this contract in whole or in part for its convenience.
17.0 TERMINATION FOR NON-APPROPRIATIONS: Funds for this contract are payable from State
and/or Federal and/or Beaufort County appropriations. In the event sufficient appropriations are
not made to pay the charges under the contract it shall terminate without any obligation to Beaufort
County.
67
Item 17.
RFP #010623DOCUMENTS Page 12
SPECIAL INSTRUCTIONS
1.0 INTENT TO PERFORM: It is the intent and purpose of Beaufort County that this request permits
competition. It shall be the offeror’s responsibility to advise the Procurement Services Department
if any language, requirements, etc., or any combinations thereof inadvertently restricts or limits the
requirements stated in this RFP to a single source. Such notification must be submitted in writing
and must be received by the Procurement Services Department not later than ten (10) days prior to
the Request for PROPOSALS opening date. A review of such notifications will be made.
2.0 RECEIPT OF REQUEST FOR PROPOSALS: Request for Proposals, amendments thereto, or
withdrawal requests received after the time advertised for Request for Proposals opening will be
void, regardless of when they were mailed.
3.0 PREPARATION OF REQUEST FOR PROPOSALS
3.1 All Requests for PROPOSALS should be complete and carefully worded and must convey
all of the information requested by the County. If significant errors are found in the
offeror’s Request for PROPOSALS, or if the Request for PROPOSALS fails to conform
to the essential requirements of the RFP, the County and the County alone will be the judge
as to whether that variance is significant enough to reject the Request for PROPOSALS.
3.2 Request for PROPOSALS should be prepared simply and economically, providing a
straightforward, concise description of offerors capabilities to satisfy the requirements of
the RFP. Emphasis should be on completeness and clarity of content.
3.3 Each copy of the Request for PROPOSALS should be bound in a single volume where
practical. All documentation submitted with the Request for PROPOSALS should be
bound in that single volume.
3.4 If your Request for PROPOSALS includes any comment over and above the specific
information requested in our Request for Request for PROPOSALS (RFP), you are to
include this information as a separate appendix to your Request for PROPOSALS.
4.0 AMENDMENTS: If it becomes necessary to revise any part of the RFP, an amendment will be
provided to all offerors who received the original Request for Request for PROPOSALS. The
County shall not be legally bound by an amendment or interpretation that is not in writing.
5.0 ADDITIONAL INFORMATION: Offerors requiring additional information ma y submit their
questions, in writing to the Procurement Services Department. Answers to questions received that
should change and/or clarify this solicitation will be provided in writing to all offerors via an
amendment.
6.0 ORAL PRESENTATION/DISCUSSIONS: Any offeror or all offerors may be requested to make
an oral presentation of their Request for PROPOSALS to the County, after the Request for
PROPOSALS opening. Discussions may be conducted with responsible offerors, who submit
Request for PROPOSALS determined to be reasonably susceptible of being selected for award for
the purpose of clarification to assure full understanding of and responsiveness to the solicitation
requirement.
68
Item 17.
RFP #010623DOCUMENTS Page 13
Offerors shall be accorded fair and equal treatment with respect to any opportunity for discussions
and revision of Request for PROPOSALS, and such revisions may be permitted after submissions
and prior to award, for the purpose of obtaining best and final offers. The purpose of these
presentations/discussions will be to:
(A) Determine in greater detail such offeror’s PROPOSALS.
(B) Explore with the offeror the scope and nature of the project, the offeror’s proposed method
of performance, and the relative utility of alternative methods of approach.
(C) Determine that the off eror will make available the necessary personnel and facilities to
perform within the required time.
(D) Agree upon fair and reasonable compensation, taking into account the estimated value of
the required services/equipment, the scope and complexity of proposed project, and nature
of such services/equipment.
7.0 FUNDING: The offeror shall agree that funds expended for the purposes of the contact must be
appropriated by the County Council for each fiscal year included within the contract period.
Therefore, the contract shall automatically terminate without penalty or termination costs if such
funds are not appropriated. In the event that funds are not appropriated for the contract, the offeror
shall not prohibit or otherwise limit the County’s right to pursue and contract for alternate solutions
and remedies, as deemed necessary by the County for the conduct of its affairs. The requirements
stated in this paragraph shall apply to any amendment or the execution of any option to extend the
contract.
8.0 AWARD: An award resulting from this request shall be awarded to the responsive and responsible
offeror whose Request for PROPOSALS is determined to be most advantageous to the County,
taking into consideration price and the evaluation factors set forth herei n; however, the right is
reserved to reject any and all Request for PROPOSALS received, and in all cases the County will
be the sole judge as to whether an offeror’s Request for PROPOSALS has or has not satisfactorily
met the requirements of this RFP.
9.0 PUBLIC ACCESS TO PROCUREMENT INFORMATION: No such documents or other
documents relating to this procurement will be presented or made otherwise available to any other
person, agency, or organization until after award. Commercial or financial information obtained
in response to this RFP, which is privileged and confidential, will not be disclosed. Such privileged
and confidential information includes information which, if disclosed, might cause harm to the
competitive position of the offeror supplying the information. All offerors, therefore, must
visibly mark as “Confidential” each part of their Request for PROPOSALS, which they
consider containing proprietary information.
10.0 DEVIATIONS: Any deviations from the requirements of this RFP must be listed separately and
identified as such in the table of contents.
11.0 ALTERNATES: Innovative alternative Request for PROPOSALS is encouraged, provided
however, that they are clearly identified as such and all deviations from the primary Request for
PROPOSALS are listed.
69
Item 17.
RFP #010623DOCUMENTS Page 14
12.0 GRATUITIES: It shall be unethical for any person to offer, or give, or agree to give any County
employee or former County employee; or for any County employee or former County employee to
solicit, demand, accept, or agree to accept from another person a gratuity or an offer of employment
in connection with any decision, approval, disapproval, recommendation, or preparation of any part
of a program requirement or a purchase request, influencing the content of any specification or
procurement standard, rendering of advice, investigation, auditing, or in any other advisory
capacity in any proceeding or application, request for ruling, determination, claim or controversy,
or other particular matter pertaining to any program requirement, or a contract or subcontract, or to
any solicitation or Request for PROPOSALS therefore.
13.0 KICKBACKS: It shall be unethical for any payment, gratuity, or offer of employment to be made
by or on behalf of a subcontractor under a contract to the prime contractor or higher tier
subcontractor, or any person associated therewith, as an inducement for the award of a
subcontractor order.
14.0 PROTEST PROCEDURES
14.1 Right to Protest: Any actual or prospective bidder, offeror, or contractor, who is aggrieved,
in connection with the solicitation or award of a contract, may protest to the P rocurement
Services Director. The protest shall be submitted in writing fourteen (14) days after such
aggrieved person knows or should have known of the facts giving rise thereto. The protest
must be accompanied by a detailed statement, indicating the reasons for such protest.
14.2 Authority to Resolve Protest : The P rocurement Services Director shall have authority,
prior to the commencement of an action in court concerning the controversy, to settle and
resolve a protest of an aggrieved bidder, offeror, or contractor; actual or prospective,
concerning the solicitation or award of a contract.
14.3 Decision: If the protest is not resolved by mutual agreement, the P rocurement Services
Director shall issue a decision, in writing within ten (10) days. The decision shall,
(A) State the reasons for the action taken; and
(B) Inform the protestant of its right to administrative review as provided in this
Section.
14.4 Notice of Decision : A decision under Subsection (3) of this Section shall be mailed or
otherwise furnished immediately to the protestant and any other party intervening.
14.5 Finality of Decision: A decision under Subsection (3) of this Section shall be final and
conclusive, unless fraudulent, or
(A) Any person adversely affected by the decision appeals administratively, within ten
(10) days after receipt of decision under Subsection (3) to the County Council in
accordance with this Section.
(B) Any protest taken to the County Council or court shall be subject to the protestant
paying all administrative costs, attorney fees, and court costs when it is determined
that the protest is without standing.
70
Item 17.
RFP #010623DOCUMENTS Page 15
EXHIBIT A
Certification regarding Debarment, Suspension, Ineligibility, and Voluntary
exclusion
The contractor certifies, by submission of this qualification statement or acceptance of a contract, that
neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible,
or voluntarily excluded from participation in this transaction by any State, Federal department, or agency.
It further agrees by submitting this qualification statement that it will include this clause without
modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the
bidder/contractor or any lower tier participant is unable to certify to this statement, it shall attach an
explanation to this solicitation/bid.
State whether your company has been involved in any litigation within the past five (5) years,
arising out of your performance.
Circle Yes or No.
if you answer yes, explain fully if it has been involved in any litigation involving performance.
71
Item 17.
RFP #010623DOCUMENTS Page 16
EXHIBIT B
CERTIFICATION BY CONTRACTOR
Regarding
NON-SEGREGATED FACILITIES
The Bidder certifies that he does not, and will not, provide and maintain segregated facilities for his
employees at his establishments and, further that he does not, and will not, permit his employees to
perform their services at those locations, under his control, where segregated facilities are provided and
maintained. Segregated fountains, transportation, parking, entertainment, recreation, ad housing
facilities; waiting, rest, wash, dressing, and locker room, and time clock, work, storage, restaurant, and
other eating areas which are set apart in fact, or by explicit directive, habit, local custom, or otherwise,
based on color, creed, national origin, and race. The Bidder agrees that, except where he has obtained
identical certifications from proposed s ubcontractors for specific time periods, he will obtain identical
certifications from proposed subcontractors prior to the award of subcontractors exceeding $10,000.00
which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such
certifications in his files.
The Bidder agrees that a breach of this certification is a violation of the Equal Opportunity clause in this
Contract. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
Contractor
(Signature)
Name and Title of Signer
Date
72
Item 17.
RFP #010623DOCUMENTS Page 17
EXHIBIT C
EVALUATION FORM
DATE: ________________________
RFP#: ______ TITLE: ___________________
OFFEROR: _____
POINT RANGE POINTS ASSIGNED
1.0 Demonstrated understanding of the
objectives, scope of work and issues
needing to be addressed during each
phase of the project. 0-20 Points
2.0 Approach to the process and ability to
meet objectives in all phases of the
project. 0-20 Points
4.0 Quality of performance/workmanship of
previous contracts and services provided,
equipment, or references which attest to
the specific experience of others. Each
company must provide an equipment
list and products they will be using. 0-25 Points
5.0 Qualifications of project personnel and
the offeror’s ability to commit capable
staff and support a project of this size.
Provide resumes for each team member. 0-20 Points
6.0 Cost effectiveness and reasonableness of
offeror’s proposed fee for the equipment,
installation, warranty, testing, and training
0-15 Points
TOTAL POINTS
73
Item 17.
/i255
/1/2/3/4/2/5/6/i255/7/8/9/i255/7/10/7/11/i255
/i255
/12/13/14/i255/i255/15/16/17/18/19/3/i255/15/13/2/20/i255/21/16/5/22/19/5/18/i255
/i255/11/23/i255/24/4/25/25/16/18/i255/26/5/27/i255
/i255/15/16/17/18/19/3/i255/15/13/2/20/i255/28/29/17/2/3/20/9/i255/24/30/i255/i255/7/31/31/7/32/i255
/21/33/30/33/i255/34/35/4/16/22/25/13/3/18/i255/36/22/37/5/2/20/13/29/i255
/i255
/26/16/38/19/29/i255/12/13/39/19/5/20/13/5/i255/40/26/4/22/17/16/39/2/18/13/20/i255/41/19/5/i255/42/3/43/15/2/3/20/i255/24/22/2/5/13/44/i255/i255 /40/7/44/i255/7/8/9/31/10/10/27/10/10/i255/45/i255/8/31/9/46/10/10/27/10/10/i255
/i255
/47/16/48/13/5/18/6/i255/24/33/21/12/i255/49/19/16/39/13/i255/30/19/25/25/4/3/16/39/2/18/16/19/3/i255/30/19/3/18/5/19/17/i255/24/6/29/18/13/25/29/i255/40/50/44/i255/50/8/31/9/46/10/10/27/10/10/i255/45/50/8/31/9/46/10/10/27/10/10/i255
/40/49/30/30/24/44/i255
/i255
/47/16/48/13/5/18/6/i255/24/33/21/12/i255/12/13/39/19/25/25/13/3/20/13/20/i255/24/22/2/5/13/i255/30/19/25/22/19/3/13/3/18/29/i255/i255 /40/50/44/i255/11/11/9/31/10/10/27/10/10/i255/45/11/11/9/31/10/10/27/10/10/i255
/i255
/28/3/39/17/4/20/13/29/i255/18/51
/13/i255/52/19/17/17/19/53/16/3/37/i255/28/18/13/25/29/14/i255
/30/19/25/25/4/3/16/39/2/18/16/19/3/i255/54/5/19/39/13/29/29/19/5/i255/40/30/42/54/44/i255/55/19/20/4/17/13/i255/40/50/56/52/44/i255/57/i255/54/30/50/10/8/i255/58/16/18/i255
/26/16/37/16/18/2/17/i255/21/4/20/16/19/i255/54/5/19/39/13/29/29/19/5/i255/40/26/21/54/44/i255/55/19/20/4/17/13/i255/40/12/2/20/16/19/i255/57/i255/33/34/47/i255/28/3/18/13/5/41/2/39/13/i255/53/59/19/i255/60/43/30/19/3/3/13/39/18/i255/30/2/48/17/13/29/44/i255
/56/30/42/47/i255/55/19/20/4/17/13/i255/40/33/34/47/i255/28/3/18/13/5/41/2/39/13/9/i255/53/59/19/i255/60/43/30/19/3/3/13/39/18/i255/30/2/48/17/13/29/44/i255
/34/18/51/13/5/3/13/18/i255/24/53/16/18/39/51/i255/61/i255/50/36/i255/40/7/8/43/54/19/5/18/i255/50/10/59/50/10/10/44/i255
/54/19/53/13/5/i255/24/4/22/22/17/6/i255/55/19/20/4/17/13/i255/40/62/23/49/26/30/59/7/31/21/9/i255/62/50/7/49/26/30/59/8/21/i255/57/i255/43/50/7/49/26/30/59/50/21/i255/40/50/50/23/59/7/11/10/49/21/30/44/44/i255
/63/64/63/i255/66/67/68/i255/69/70/71/72/73/70/74/i255/75/76/77/77/78/79/80/81/67/82/i255
/7/36/i255/30/19/25/22/2/39/18/i255/54/19/29/16/18/16/19/3/i255/34/35/4/16/22/25/13/3/18/i255/40/53/59/54/30/i255/57/i255/54/24/44/i255
/54/21/30/i255/55/19/20/4/17/13/i255/40/15/16/37/51/43/24/22/13/13/20/44/i255
/54/19/29/16/18/16/19/3/i255/24/54/58/12/i255/61/i255/26/34/24/58/33/42/54/i255/40/53/59/49/19/17/i255/30/33/12/47/44/i255
/1/2/39/83/48/19/60/i255/57/i255/30/2/48/17/13/i255
/15/13/2/20/29/13/18/i255
/15/2/3/20/29/13/18/i255/57/i255/30/5/2/20/17/13/i255
/54/33/33/i255/52/19/19/18/29/53/16/18/39/51/i255/53/59/30/2/48/17/13/i255
/i255
/i255
/47/16/48/13/5/18/6/i255/24/33/21
/12/i255/24/4/22/22/19/5/18/i255/24/13/5/38/16/39/13/29/i255/40/42/3/43/30/2/17/17/i255/33/13/39/51/3/16/39/2/17/i255/24/4/22/22/19/5/18/44/i255/40/50/44/i255/46/9/31/10/10/27/10/10/i255/45/i255/i255/i255/i255/46/9/31/10/10/27/10/10/i255
/i255
/1/19/18/5/19/3/i255/33/12/43/84/84/23/10/i255/49/15/52/59/21/55/i255/55/4/17/18/16/25/19/20/13/i255/33/5/2/3/29/39/13/16/38/13/5/i255/i255 /40/7/44/i255/50/84/9/11/84/23/27/10/10/i255/45/i255/11/8/9/7/84/23/27/10/10/i255
/i255
/1/19/18/5/19/3/i255/33/21/43/84/32/23/10/i255/49/15/52/59/21/55/i255/55/4/17/18/16/25/19/20/13/i255/33/5/2/3/29/25/16/18/18/13/5/i255/i255 /40/50/44/i255/50/46/9/10/10/10/27/10/10/i255/45/i255/50/46/9/10/10/10/27/10/10/i255
/i255
74
Item 17.
/0/1/2/3/4/5/i255/5/7/8/9/10/11/12/i255/13/14/15/16/i255/i255/0/1/2/3/4/5/i255 /i255/i255/i255/17/18/19/i255/i255/20/21/12/22/18/23/24/23/23/i255/i255 /25/i255/20/21/12/22/18/23/24/23/23/i255/i255
/i255
/2/3/4/5/i255/5/7/8/9/10/11/i255/26/15/27/28/29/30/10/8/16/i255
/31/28/10/32/4/0/5/i255/18/33
/34/i255/2/3/4/5/i255/5/10/35/36/10/35/i255
/18/21/24/37/i255/38/39/11/13/29/9/10/35/14/40/39/15/26/9/39/35/i255
/41/10/7/42/39/43/35/30/i255/44/i255/3/35/43/27/45/42/43/28/28/i255
/40/26/27/35/39/13/46/39/15/10/i255
/4/15/9/10/35/47/43/27/10/8/i255/47/39/35/i255/33/48/33/12/i255/43/15/30/i255/2/49/50/5/14/2/5/50/5/i255/38/i255
/31/28/10/32/4/0/5/i255/0/1/2/3/4/5/i255/51/26/9/46/i255/3/35/29/10/i255/48/39/26/27/10/i255/52/26/27/10/15/8/10/i255
/0/4/53/4/3/2/52/i255/2/3/4/5/i255/5/54/33/48/4/38/54/i255
/i255
/4/15/8/9/43/28/28/43/9/26/39/15/i255/39/47/i255/33/10/27/39/35/30/10/35/12/i255/48/39/26/27/10/i255/38/39/11/11/29/15/26/27/43/9/26/39/15/i255/5/7/8/9/10/11/12/i255
/33/43/30/26/39/8/i255/44/i255/0/1/2/3/4/5/i255/5/7/8/9/10/11 /i255 /i255/i255/i255/17/18/23/19/i255/22/12/18/55/20/24/23/23/i255/i255 /25/22/18/12/55/20/23/24/23/23/i255
/i255
/i255
/56/57/58/59/60/61/i255/63/64/64/65/66/67/67/68/69/69/i255/i255/i255/i255/i255
/i255
/i255
/i255
75
Item 17.
76
Item 17.
77
Item 17.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of Award to LSP3 for the design of the new Public Works Building ($1,467,636)
MEETING NAME AND DATE:
Public Facilities and Safety Committee May 22nd, 2023
PRESENTER INFORMATION:
Jared Fralix, P.E., Assistant County Administrator, Engineering
Neil J. Desai, P.E., Public Works Director
(5 Minutes)
ITEM BACKGROUND:
The current Public Works Building is 45 years old and needs extensive facility repairs and upgrades that have
been continually deferred. Additionally, the existing space is inadequate for the current department
personnel and for future departmental growth. This was validated by the Creech and Associates 2021 Space
Needs Assessment that identified the requiring of more space for future needs. Additionally, rather than
continue to spend funds on an older facility for temporarily repairs, it would be more made fiscally feasible to
building a new facility.
PROJECT / ITEM NARRATIVE:
In October 2022, the RFP was advertised, and a total 10 firms applied and 4 of those firms were short listed
for interviews. Based on the evaluation from the selection committee, LS3P was selected as the A/E firm.
FISCAL IMPACT:
The contract fee is $1,334,215. Staff recommends a 10% contingency of $133,421, bringing the project’s total
cost to $1,467,636. The funding source for this item is account 10401301-54450 with a balance of
$1,886,149.59 that was allocated for this project.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award the contract for the design of the new public works building to LSP3.
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny the recommendation to award the design of the new public works building to LSP3.
Next Steps - A Majority Vote for Acceptance by Committee would move item forward to final acceptance by
full County Council vote.
78
Item 18.
Fee Proposal
05 May 2023
________________________
Neil J. Desai, P.E.
Beaufort County
Public Works Director
120 State Rd S-7-86, Beaufort, SC 29906
1702-226160
Beaufort County Public Works Complex
________________________
Dear Neil:
Based on our conversations and understanding of the project and its
complexity, LS3P is prepared to offer this proposal for architectural,
interior, and engineering design services for Beaufort County’s new
facilities on your existing 15-acre campus in Beaufort SC. This proposal
includes the Schematic Design through Construction Document and
Permitting/Procurement Phase services. The fee and schedule
proposed, assumes that the recently updated program is generally
acceptable, and a major reprogramming effort will not be required.
DESCRIPTION OF PROJECT
The subject property will be built on the existing 15-acre Public Works
administration campus at 120 Shanklin Rd, Beaufort SC.
The purpose of the proposed facility is to have the capability to house all
the northern Public Works operations on one campus. The design
supports Public Works operations and encompass future needs. It is
anticipated that the project will be procured through a public design-
bid-build method and bid phase services are outlined herein
accordingly. Features of the new facility include an updated garage
equipped with the spatial needs to service heavy equipment and a high
volume of vehicles, an Emergency Operation Center, administrative
office space, meeting/conference areas, locker/break rooms,
functioning kitchen area, flexible space dormitory-style sleeping area
that can be multi-functioning, and ample storage space.
The project scope consists of 5 phases of work:
Phase 1 – +/-25K SF new Public Works Admin Building + Sitework
Phase 2 – 15K SF Conditioned Storage + Sitework
Phase 3 – 5K SF Unconditioned Storage + Sitework
Phase 4 – 3,900K SF Garage addition + Sitework
Phase 5 – 17K SF Pole Barns + 600 SF Material Bins + Sitework
The administration building program and conceptual study/masterplan
by Creech & Associates is attached to this proposal.
79
Item 18.
The Design Services will be provided in phases as follows:
1. Schematic Design (35% Drawings)
2. Design Development (65% Drawings)
3. Construction Documents (100% Drawings)
4. Permitting Assistance and Procurement
SCOPE OF WORK
This proposal will provide Schematic Design through Construction Document services for Architecture, Interior
Architecture and Design, Civil Engineering, Landscape Architecture, Structural Engineering, Mechanical, Electrical
and Plumbing Engineering, Fire Protection Engineering, Geotechnical Engineering, and Cost Estimating. We will
coordinate the work of all consultants.
BASIC SERVICES
1. SCHEMATIC DESIGN - These services will be lump sum and will include the following tasks:
a. Building programming; assume (2) meetings with department user groups and key stakeholders to further
develop the building program.
b. Assist is the development of a master plan for the site and confirm site location and extents of buildings.
c. Development of the Conceptual floor plans into Schematic Design level site plan, floor plans, core plans,
roof plan, building sections, four building elevations and two exterior renderings. The goal of Schematic
Design is to provide dimensioned spaces that test interior and site layouts with utility spaces identified and
engineering approaches defined that meet your budget.
d. Preliminary Interior Architectural design concepts with initial finish selections shown in loose format,
including 3 renderings.
e. Preliminary code search and discussions with the code official and fire official.
f. Short form specifications
g. Geotechnical Report.
h. Preliminary load analysis for the building’s structure and preliminary footing, column design, floor slab
design and narrative
i. Preliminary HVAC, Plumbing and Fire protection drawings and narrative.
j. Preliminary civil design for utilities, drainage and will be underway with permitting. (OCRM, etc.)
k. (3) design meetings with the owner during this phase. One meeting will consist of an interior charrette to
review Owner preferences, program, and design concepts/desired aesthetic. The other two are at the 50%
midpoint point, and a phase completion review comment meeting.
l. Start Revit model and rendering of the project exterior.
m. We will provide one full-size set of the documents to the Owner if desired and or electronic copies of
documents.
n. Provide a Schematic Design Cost Estimate (Multi-building template with multiple Buildings & Phases).
o. We have prepared our schedule and budget based on receiving prompt decisions and a having a reliable
construction budget compatible with the design prior to moving to each subsequent phase.
2. DESIGN DEVELOPMENT - These services will be lump sum and will include the following tasks:
a. Minor modifications to the project design based on cost information and requested changes by the owner.
These are to occur in the first week of the phase.
80
Item 18.
b. Elements of the Interior Architecture including finishes, lighting, millwork, and detailing systems will be
finalized.
c. MEP, Landscape Architect and Structural consultants will begin to draw plans in this phase. In addition, load
calculations for mechanical and electrical will begin. Utility room sizes and routing of MEP services will be
determined.
d. Confirm locations for the transformer, switchgear and other building services, phone, data, water, sewer,
etc.
e. Preparation of long-form specifications.
f. Civil Engineer will continue permitting for utilities, drainage, and landscape
g. Update the Revit model and renderings of the project.
h. (3) meetings with the owner during this phase.
i. We will provide one full-size set of the documents if desired and/or electronic copies of documents to the
Owner to obtain approval of the design prior to commencement of next phase, including the project scope,
cost and quality level desired.
j. Provide a Design Development Cost Estimate (Single-building template with multiple Buildings & Phases).
k. Final decisions on system selections including building materials, engineering systems etc. will be concluded
in this phase.
4. CONSTRUCTION DOCUMENTS - These services will be lump sum and will include the following tasks:
a. Minor modifications to the project design based on cost information and requested changes by the tenant
and owner. These are to occur in the first week of the design phase.
b. Final interior drawings will be integrated including, but not limited to, partitioning, ceiling layout, lighting
placement, typical power and data locations, and documentation of interior finishes and architectural
construction details.
c. Completion of long-form specifications.
d. Coordinate with Civil Engineer on Site work (OCRM, etc.).
e. Provide a Construction Document Cost Estimate (Single-building template with multiple Buildings &
Phases).
f. Update the Revit model and Renderings of the project for completed design.
g. (3) meetings with the owner during this phase.
h. Provide one full-size set of the documents to obtain approval of the design by Owner prior to
commencement of next phase including the project scope, cost and quality level desired.
i. Other Consultants not included in Basic Services will perform their work in this phase. LS3P will coordinate
their work.
j. Quality Assurance Review with contractors, major subs, Consultants and owners.
6. PERMITTING ASSISTANCE & PROCUREMENT - These services will be lump sum and will include the following tasks:
a. Assistance to the Owner in bid support and procurement of the selected Contractor.
b. Assistance to the contractor in obtaining a building permit approval.
a. We assume that the procurement method will be “Design-Bid-Build”. If County elects to use Construction
manager at Risk (CM@R) procurement method at DD or prior to CDs, LS3P will define Bid Assistance tasks
and negotiate any changes, if required.
b. The owner acknowledges and agrees that LS3P has no influence over the various Authorities having
jurisdiction (AHJ) over the project or their respective review and approval schedules. LS3P will assist the
Owner/GC in applying for the necessary approvals by the AHJs but ultimate responsibility for obtaining such
approvals and for the progress of the Project remains with the Owner and his Contractor.
81
Item 18.
7. CONSTRUCTION CONRACT ADMINISTRATION - Not included. These services will be negotiated as a separate
contract or as an amendment this contract.
SUPPLEMENTAL SERVICES
1. FURNITURE, FIXTURES, & EQUIPMENT (FF&E) - Actual cost of FF&E items are not included in the Project Cost.
These services will be lump sum and will include the following tasks:
a. Prepare a budget for FF&E requirements. Client to confirm budget prior to starting selections.
b. Provide furniture and furniture finish selections.
c. Digital furniture presentation boards
d. Coordinate with furniture dealer, as selected by LS3P, to confirm final specifications, budget pricing, and
schedule.
e. (3) meetings with the owner during this phase
f. FF&E specifications will be documented in spreadsheet format including quantities, and furniture plans will
be utilized to illustrate “tagged” furniture locations.
g. Final Review of purchase orders
h. (1) site visit to oversee furniture installation and provide punch list
2. BUILDING ENVELOPE CONSULTING
DESIGN DEVELOPMENT (DD)
a. Attend one quality assurance review meeting to review proposed building envelope systems and proposed
detailing systems.
b. Provide design guidelines and other standards for consideration in the development of building envelope
details and specifications.
c. Provide preliminary specifications for all materials and assemblies and materials associated with
waterproofing the roof, roof structures, equipment and parapets. Specifications shall follow the format
provided by LS3P.
d. Review LS3P’s applicable specifications and provide written comments based on the review.
CONTRACT DOCUMENTS (CD)
a. Provide complete specifications for all materials waterproofing the roof, including, but not limited to
general roofing, roof insulation, flashing roof penetrations, flashing roof structures, flashing roof
equipment, roof to wall intersection flashing, building expansion joint waterproofing (if any) and parapet
waterproofing. Specifications shall follow the format provided by LS3P.
b. Provide all required roof details. Details shall be drawn in AutoCAD on sheet layout formats provided by
LS3P for incorporation into the project drawing set. LS3P will provide the digital files to be used as the basis
for detailing.
DESIGN REVIEW
a. Provide building envelope design review to include, but not be limited to, exterior window and door
openings, wall cladding (veneer) terminations, and building expansion joint details (if any).
b. Provide recommendations (in the form of comments, mark-ups, sketches and/or recommended products)
to LS3P, for consideration in the development of the construction documents as they relate to the building
envelope details.
c. Review applicable specification generated by LS3P and provide comments for recommended changes.
82
Item 18.
3. LOW VOLTAGE - Actual cost of low voltage equipment are not included in Project Cost, only conduit and
pathways.
a. Meet with (owner/tenant/user) staff to determine end user requirements.
b. Advise on space requirements for the data/voice system and associated equipment.
c. Investigate heat load, power and grounding requirements for the data/voice networking equipment.
d. Provide layout of racks and equipment for the main distribution frame (MDF) and intermediate distribution
frame (IDF) closets. Develop equipment rack elevations.
e. Determine voice and data riser capacity requirements.
f. Development bid/construction drawings and written specifications. These will include floor plans,
copper/fiber riser diagram(s), enlarged MDF/IDF floor plans and system installation requirements.
g. Coordinate service entrance requirements with telecommunications service providers.
h. This scope does not include specifications for the purchase and/or installation of active data/voice network
equipment (e.g. servers, data hubs, switches, network interface cards, routers, PBX or key systems, service
provider equipment, software etc.).
4. SITE SURVEY
a. Survey services for approximately 15-acres, for as-built of the parcel. Three (3) parcels currently owned by
Beaufort County and City of Beaufort. Those parcels are R100 0255 000 050D, R100 025 000 050B 0000, and
R100 025 000 050E 0000.
b. Scope of Services will include:
1. Complete a pre-survey inspection of the site to confirm all utility structures are accessible. Contact the
appropriate utility company to unlock any sealed utility lids and/or to remove sediment and debris from
utility structures.
2. Perform Utility Designation using existing utility records, visible utility facilities, and geophysical locating
equipment to determine the existence and horizontal position of all utilities within the project limits.
Contact all utility companies to obtain maps of the existing utility infrastructure. List all utility company
contact information on the survey. Contact Palmetto Utility Protection Services. Qualified personnel and
equipment shall be used for designation, or a qualified utility location service shall be hired to perform
the work. Geophysical means anticipated are magnetic and electromagnetic locating equipment. Use of
Ground Penetrating Radar is not anticipated, if needed, it shall be performed as additional service.
Locate all valves, hydrants, meters, and poles.
a. Show manholes, inverts and pipe sizes for all sanitary sewer systems. Locate the next
upstream and downstream manholes from the site/sur vey limits.
b. Show structures, inverts, materials and pipe sizes for all storm drainage systems. In coastal
areas, complete storm drainage survey at low tide.
c. Show potable water systems
d. Gas lines
e. Distance to the nearest fire hydrant (distance to hydrant is adequate if not located on the
project site or within adjacent right-of-way).
f. Electric, telephone, and cable television lines (overhead and underground). Indicate location
of poles and guy anchors. Include pole numbers. Include elevation of lowest wires in
relation to existing grade.
3. Survey to include property lines within the survey limits, easements, building setbacks, landscape buffers,
encroachments, right-of-ways (indicate owner/jurisdiction/zoning), adjoining property owners, and TMS.
Boundaries shall be all labeled in the same direction. Tie survey to the closest roadway station, if
applicable (verify with DOT).
83
Item 18.
4. Include flood zone hazard zones (or floodways) and reference the current FEMA Flood
Panel.
5. All opposing and adjacent entrances and curb cuts within all adjacent right-of-ways.
6. All data shall be oriented to State Plane coordinates (South Carolina NAD 1983). All data shall be delivered
in true “ground” scale with the point used to reference to state plane identified and with scale factor to
convert to state plane “grid” scale.
7. Topographic survey including all spot elevations (to the nearest .01’ for paved surfaces, 0.05’ on other
surfaces), invert elevations, 1’ contours based on NAVD88 vertical datum. 8. Benchmarks and Control
Points – Surveyor shall set a minimum of 2 temporary benchmarks/control points on site both referencing
State Plane Coordinates (South Carolina NAD 1983) horizontal datum and NAVD88 vertical datum. Include
conversion factor for NGVD29 to NAVD88 datum.
9. Topographic and location survey shall be continued a minimum of 25 feet beyond all property lines and
shall include the entire width of all right of ways adjacent to the property.
10. Location of all above ground and underground natural and constructed features. As a minimum, indicate
the following:
a. Show all buildings, type (e.g. 2 story brick), finished floor elevation(s) at all exterior doors,
door locations, canopies, columns, downspouts and stoops.
b. Fences (Indicate type)
c. Pavements (Indicate type) & roadway numbers
d. Pavement striping and direction arrows
e. Curb & Gutter & ramps (Indicate type, width and where elevations are taken)
f. Retaining walls. (Indicate elevations at bottom, top and back of wall.)
g. All signage & type (stop, yield, etc.)
11. All water bodies to include, as a minimum, all lakes, rivers, streams, creeks, and ponds. Indicate elevation
of water surface at time of survey. Indicate top and bottom banks.
12. Tree survey. All trees 8 inches DBH and larger, and all dogwoods (Cornus spp.), redbuds (Cercis
canadensis), and magnolias (Magnolia spp.) four inches DBH and larger.
13. Wetlands survey – flagging by others.
c. Deliverables:
1. Drawings at an appropriate scale (1”=30’ preferred) and on a 30”x42” (maximum) sheet (Include surveyor’s
seal and signature).
2. Single AutoCAD drawing file (AutoCAD 2014 or later) to State Plane coordinates (SC NAD 1983) with
existing features on separate layers. Include surface TIN lines and/or surfaces created using LandXML
export.
3. Copies of all utility locate request tickets.
4. Copies of all deeds and plats referenced on the boundary and topographic survey.
5. Wetland Delineation Plat.
5. GEOTECHNICAL ENGINEERING
a. Geotechnical subsurface exploration and report, including preliminary borings and locations attached. We
recommend 10 Electronic Cone Penetrometer Tests (CPTs) to depths ranging between 50 and 25 feet below
grade, to assist with foundation recommendations along with classifying the site properly. To further aid in
the proposed asphalt locations, we propose to perform 4 Kessler Dynamic Cone Penetrometer Tests to
approximately 4 feet below grade. Work excludes research, assessment, or borings directly near existing fuel
tanks – see below environmental exclusions.
84
Item 18.
b. We assume that the existing and former landfill areas of the site will be disturbed as little as possible for new
work. If County elects to disturb the landfill “Cap”, or mitigate subsurface areas of the former landfill beyond
simple geotechnical subsurface exploration, or design changes affect these areas beyond minimal
disturbance, the design team will negotiate any changes, if required. This proposal assumes 20 hours, for
coordination of landfill research with the County and SCDHEC only.
ITEMS NOT INCLUDED IN THE SCOPE OF WORK - These may be provided by additional service:
a. Work of consultants not identified above. Lighting design, Acoustical design, Audio Visual design,
Environmental Assessment (Landfill Soils) testing, and specialty Foundation Engineering.
b. 3D physical models.
c. Value engineering of the project beyond the one week at the start of Design Development and Construction
Document phases. We expect the owner to carry sufficient contingency to cover items not shown in the
drawings.
d. Exterior metal stud wall design, or steel shop drawings.
e. Elevator consultants
f. Green Building (LEED, Green Globes, etc.) or other sustainable certification: Submission expenses, Energy
modelling, or Commissioning.
g. Work with a third-party plan reviewer
h. Cost associated with stopping and starting the project of a period longer than 45 days.
i. Costs associated with the assembly of design sets for early permitting (foundation or steel building sets,
window, elevator, stairs, etc.)
j. Furniture and equipment survey of existing owned pieces for reuse purposes.
k. Physical finish materials boards for use in presentation.
l. Custom signage and graphics.
m. Zoning requests, variances and/or annexations
n. Subdivision of properties and/or plat approvals.
o. ROW improvements beyond modifications to an existing curb cut or a new curb cut (such as
acceleration/deceleration lanes).
p. Design and permitting of sanitary sewer lift stations.
q. Traffic studies or traffic engineering.
r. Cultural or archaeological studies, remediation or design.
s. Environmental studies, remediation, or design, or Phase 2 site assessment - especially for existing fuel tank
areas.
t. Threatened and Endangered Species Assessment
85
Item 18.
COMPENSATION
1. LS3P proposes the outlined services based on the attached work development schedule. Compensation for
the work identified above as lump sum will be invoiced on a monthly basis according to the percentage
complete. Hourly services indicated above and any additional services will be billed monthly at the rates
contained in the attached Exhibit 1 - Standard Terms dated June 2021. Proposed fee for the Services
above; Schematic Design through Construction Administration and Supplemental Services: $1,334,215 .00
(One Million, Three Hundred Thirty -Four Thousand, Two Hundred a nd Fifteen dollars) plus reimbursable
expenses. Please budget 1-2% of the fee for reimbursable expenses, for design phases.
2. For billing purposes, the fee breakdown per phase is as follows:
Schematic Design 35% $466,975.00
Design Development 30% $400,265.00
Construction Documents 30% $400,265.00
Permitting & Procurement 5% $66,711.00
Construction Administration NOT INCLUDED (t ypically 20-25% of total design costs)
SCHEDULE
See attached preliminary project design schedule exhibit.
BASIC SERVICES FEE
CivilEngineering $103,500 *
Landscape Architecture $27,600 *
Structural Engineering $92,665 *
Architectural Design $625,000
Mechanical, Electrical, Plumbing & FP Engin. $220,800 *
* includes consultant markup (x1.25) SUBTOTAL $1,069,565
SUPPLEMENTAL SERVICES FEE
Roofing and Building Envelope Consulting $61,755 *
Low Voltage Design (data cabling & security) $34,500 *
Furniture Fixtures & Equipment Planning $75,000
Signage and Graphics $15,000
$21,850 *
Cost Estimating $42,746 *
Geotechnical Exploration & Report $13,800 *
* includes consultant markup (x1.15) SUBTOTAL $264,651
TOTAL A/E FEE $1,334,215
Site & Tree Survey Buford Goff & Associates
Aiken Cost Consultants
Team
Team
REI Engineers
Buford Goff & Associates
LS3P
Alliance Engineering
Cranston Engineering
LS3P
Beauford Goff & Associates
Alliance Engineering
LS3P
ECS
86
Item 18.
Neil, thanks again for your trust in executing the proposed project. Please review and call me with any questions. If
you would like to proceed under this agreement, please sign on the line below and return via email.
Best regards, We So agree:
LS3P ASSOCIATES LTD. ________________________
Dennis L. Blaschke, AIA Daniel J. Scheaffer, AIA
Senior Associate Principal ____________ ________
Senior Project Manager Senior Project Manager Date
Cc: Business Department, File
Attachments:
a. Conceptual Site Plan from RFP, dated September 26, 2023
b. Proposed Public Works Administration Building Program, dated April 04, 2023
c. Proposed Project Schedule
d. Proposed Test Boring Locations
e. Exhibit 1 – Standard Terms, dated June 2021 (incorporated herein by reference)
87
Item 18.
BEAUFORT COUNTY COMPREHENSIVE SPACE ANALYSIS
AND MASTER PLANNING 100
EXISTING ADMIN TOTAL: 3,500 GSF
EXISTING PARKING: 0
NEW ADMIN TOTAL: 20,000 GSF
NEW TOTAL PARKING: 242
EXISTING PARKING: 0
PUBLIC PARKING: 58
SECURE PARKING: 161*
TOTAL PROVIDED: 219*
REQUIRED PARKING: 167
*EXCLUDES POLE BARNS
FUEL
GARAGE,
11,100 SF
CONDITIONED
YARD SPACE,
15,000 GSF
PUBLIC PARKING
58 SPACES
NEW SECURITY
FENCE
NEW SECURITY
GATE
(3) POLE BARNS
20 BAYS EACH
COVERED
EXTERIOR(2) COVERED
EXTERIOR
3,000 GSF
PARKING 161
SPACES
GARAGE
EXPANSION
3,900 SF
MATERIALS,
6 BINS,
100 SF EACH
NEW SECURITY
GATE
DEMO EXISTING
ADMIN FOOTPRINT,
3,500 GSF
50’ 200’
NEW GATE AT
EXISTING ACCESS
ROAD
UNCONDITIONED
STORAGE,
5,000 SF
NEW PW ADMIN
BUILDING
2 STORY / 20,000 GSF
BEAUFORT PUBLIC WORKS SITE
DEVELOPMENT SUMMARY
Establish public face to pw site and screen
PW bays and employee parking behind
admin building
Organize and condense existing PW yard
to create efficiencies
Keep existing PW administration building
operational until construction of new
building
DESIGN DRIVERS
*Existing pistol range to
remain on site in current
location
88
Item 18.
PROGRAM
Description Space Type
Qty w/
Growth Area/Space SF
General Notes / Comments
OFFICE BUILDING
Department Public Works Admin
Director Private Office 1.00 300.00 300.00 w/ private re stroom and kitchenette
Deputy Director Private Office 1.00 240.00 240.00
Admin Assistant Private Office 1.00 120.00 120.00 adjace nt to Director
(future) Safety/Training Officer Small private offic e 1.00 100.00 100.00 new future position
(future) Grants Coordinator open office/cubicle new future position
(future) Admin Assistant open office/cubicle new future position
Flex Workstation Open Office 1.00 40.00 40.00
Operations
Assistant Public Works Director - Operations Private Office 1.00 240.00 240.00
Assistant Public Works Director - Environmental Private Office 1.00 240.00 240.00
Assistant Public Works Director - Support Private Office 1.00 240.00 240.00
Superintendants Open Office 7.00 80.00 560.00 space for plan layout
Assistant Superintendents Open Office 5.00 64.00 320.00 adjacent to muster stations
Foreman Open Space 4.00 64.00 256.00 adjacent to muster stations
Fleet
Manager Private Office 1.00 150.00 150.00 I assume all o f fleet will be in the new garage
Admin Open Office 1.00 80.00 80.00 4 office staff, 13 me chanics
Special Projects
Engineer Open Office
Stormwater
Manager Private Office 1.00 150.00 150.00
Deputy Manager Open Office 1.00 80.00 80.00
Admin Assistant Open Office 1.00 80.00 80.00 connected t o Manager
Utility Manager Open Office 1.00 80.00 80.00
4/17/2023 OFFICE BUILDING 1
89
Item 18.
PROGRAM
Description Space Type
Qty w/
Growth Area/Space SF
General Notes / Comments
Operations / Infrastructure Super Open Office 1.00 80. 00 80.00
Regulatory Inspectors Open Office 64.00 64.00 adjacent to Muster stations, will need st orage space for plans
Regulatory Lead Inspectors Open Office 2.00 64.00 128.0 0 adjacent to Muster stations, will need storage spa ce for plans
Disaster Recovery
Staff Open Office 2.00 80.00 160.00
Traffic Operations
Super Private Office 1.00 150.00 150.00
Admin Assistant Open Office 1.00 80.00 80.00
Solid Waste & Recycling
Manager Private Office 1.00 150.00 150.00
Admin Assistant Open Office 1.00 80.00 80.00
Business Manager Open Office 1.00 80.00 80.00
Recycling Coordinator Open Office 1.00 80.00 80.00 will need closet space for all educational items
Litter/Enforcement Supervisor Open Space 1.00 64.00 64. 00 Adjacent to Muster stations for the litter crews
CIP & Facility Management
Directors Private Office 1.00 300.00 300.00 w/ private r estroom and kitchenette
Directors Private Office 1.00 240.00 240.00
Manager Private Office 2.00 150.00 300.00
Admin Assistant Open Office 1.00 120.00 120.00 adjacent to Director
Admin Assistant Open Office 1.00 80.00 80.00
Project Managers Open Office 4.00 80.00 320.00
Assistant Director Private Office 1.00 150.00 150.00
Engineering
Director Private Office 1.00 240.00 240.00
Admin Assistant Open Office 2.00 120.00 240.00
Managers / Asst. Dir Private Office 6.00 150.00 900.00
4/17/2023 OFFICE BUILDING 2
90
Item 18.
PROGRAM
Description Space Type
Qty w/
Growth Area/Space SF
General Notes / Comments
Techs / PMs / PIO Open Office 6.00 80.00 480.00
Traffic Management Center Shared Office 1.00 300.00 300 .00 adjacent to EOC, space for 6 stations
Flex Workstation Open Office 1.00 40.00 40.00
Field Crews:
Grounds Maint. Super Crew (16) Muster Station 1.00 400 .00 400.00 muster stations could double as Training a nd Conf.
Roads and Drainage Field Crew (7) Muster Station 1.00 200.00 200.00
General Support Field Crew (5) Muster Station 1.00 200 .00 200.00
Fleet Muster Station 1.00 200.00 200.00 should Fleet mus ter in office building or in garage?
Stormwater Operations Field Crew (27) Muster Station 1.00 500.00 500.00
Traffic Control Field Crew (3) Muster Station 6.00 200 .00 1,200.00
Facility Management (20) Muster Station 1.00 500.00 500 .00
Touchdown Computer Stations Open Office 1.00 200.00 200 .00 Multiple touchdown computer stations for Field C rews
BUILDING COMMON
Lobby 1.00 200.00 200.00
Conference / Training Room 1.00 950.00 950.00 30+ person conference room, dividab le, multiple TV monitors on
walls, may be used as bunk room, may be used for muster stations
Large Conference 1.00 450.00 450.00 12 to 15 seats
Medium Conference 2.00 240.00 480.00 6 to 8 seats
Small Conference Room 3.00 144.00 432.00 4 top, near bullpens for use when c ounseling staff
Phone Booth 2.00 35.00 70.00 5'x7' for ADA, private touch down spa ce near bullpen
Break Room / Kitchen 1.00 500.00 500.00 full kitchen for EOC / seating for dining area
First Aid / Eye Wash Station 1.00 60.00 60.00 first aid / difibrillator / eye wash
Plan / File Storage 1.00 250.00 250.00 includes flat screen on wall for di gital plan review,
could also be combined with copy/work area. Could shrink with
scanning for digital plans
Uniform Storage 1.00 200.00 200.00
Cot Storage 1.00 100.00 100.00
Laundry Room 1.00 80.00 80.00 W/D, large sink, adjacent to _____
4/17/2023 OFFICE BUILDING 3
91
Item 18.
PROGRAM
Description Space Type
Qty w/
Growth Area/Space SF
General Notes / Comments
Copy/Work room 1.00 200.00 200.00 office supply, plotter, mail
Ice Machine Room 1.00 80.00 80.00 Needs own room?
Locker Rooms 4.00 80.00 320.00 in men's room, also used by field cr ew
Men's Shower 6.00 60.00 360.00 connected to mens restroom
Women's Shower 3.00 60.00 180.00 connected to womens restroom
Restrooms 2.00 240.00 480.00 additional restrooms needed if two stories
IT / Data 1.00 50.00 50.00
General Storage 3.00 150.00 450.00 storage for department files, equip ment, etc.
Workshop 1.00 1,000.00 1,000.00
Amenity
Lounge 1.00 240.00 240.00 for off duty times
Fitness Room/Wellness 1.00 450.00 450.00 w/ equipment
Mother's Room 1.00 48.00 48.00 for nursing moms / wellness room
TOTALS 19,132 GSF
x 1.35
Grossing
Factor =
25,828 Square footage may reduce as we develop plans with
multipurpose rooms
4/17/2023 OFFICE BUILDING 4
92
Item 18.
TASK START
(SUBMITTAL)
DURATION
(WEEKS)
DURATION
(DAYS)
END
(MEETING)
6/1/23
Schematic Design 6/1/23 8 56 7/27/23
SD Owner Review 7/27/23 3 21 8/17/23
Design Development 8/17/23 8 56 10/12/23
DD Owner Review 10/12/23 3 21 11/2/23
Construction Documents 11/2/23 14 98 2/8/24
CD Owner Review/Cost Approval 2/8/24 4 28 3/7/24
Permitting Assistance 3/7/24 8 56 5/2/24
GC Procurement 3/21/24 6 42 5/2/24
Beaufort County Public Works PRELIMINARY SCHEDULE
6/1/23
6/29/23
7/27/23
8/24/23
9/21/23
10/19/23
11/16/23
12/14/23
1/11/24
2/8/24
3/7/24
4/4/24
5/2/24
UPDATED: 4/17/2023
93
Item 18.
Approximate CPT/HA LocaƟon
Approximate KDCP/HA LocaƟon
94
Item 18.
CHARLESTON COLUMBIA GREENVILLE MYRTLE BEACH ASHEVILLE CHARLOTTE GREENSBORO RALEIGH WIL MINGTON ATLANTA SAVANNAH LS3P.COM
EXHIBIT 1
6/1/2021
I. STANDARD TERMS
Confidential – Not for distribution without permiss ion of LS3P ASSOCIATES LTD.
A. Agreement
This Proposal, including this Exhibit 1, is the enti re and integrated agreement between the Owner and
LS3P, supersedes all prior negotiations or agreement s, either written or oral, and shall be governed by
the laws of the state of South Carolina without reg ard to principles of conflicts of law. This Propos al
may only be amended in a writing signed by both par ties. If any provision of this Proposal is invalid or
unenforceable, the remainder of this Proposal will still be valid. By signing, the Owner agrees to th e
terms of this Proposal, including this Exhibit 1, an d agrees to pay LS3P in accordance with the terms
stated herein.
B. Exclusions
Only those services specifically included in this P roposal are included in the base services.
C. Expiration Time
This Proposal is effective up to 90 days from the Pro posal date set forth above. After ninety (90) days,
the terms set forth herein shall be subject to rene gotiation unless otherwise agreed.
D. Standard of Care
LS3P shall perform its services consistent with the professional skill and care ordinarily provided by
architects practicing in the same or similar locali ty under the same or similar circumstances. LS3P sh all
perform its services as expeditiously as is consistent with such professional skill and care and the orderly
progress of the Project. The Owner agrees that LS3P is not in control of the various authorities having
jurisdiction (“AHJ’s”) over the Project or their respective review and approval schedules. LS3P will assist
the Owner and the Contractor in applying for the ne cessary approvals by the AHJ’s but ultimate
responsibility for obtaining such approvals remains with the Owner.
LS3P shall not be required to review and shall not b e responsible for any deviations from the Contract
Documents not clearly noted by the Contractor nor shall LS3P be required to review partial submissions
or those for which submissions for correlated items have not been received. The Owner agrees that no
set of plans and specifications is entirely free of errors and omissions and that additive Change Orde rs
which arise out of errors or omissions in the plans and specification and which result in an increase in
the amount of the contract for the construction of the Project are possible. All costs of architectural
errors, omissions or other changes which result in “betterment” or “value added” to the Owner shall be
borne by the Owner, not LS3P (to the extent of the b etterment or value added), and shall not be the
basis of a claim.
E. Owner Information and Services
The Owner shall provide full information about the objectives, schedule, constraints, and existing
conditions of the Project and shall establish a bud get with reasonable contingencies that meet the
Project requirements. The Owner acknowledges, howe ver, that LS3P has no control over the cost of
labor, materials, or equipment, over the Contractor ’s methods of determining bid prices, or over
competitive bidding, market, or negotiating conditions. LS3P shall be entitled to rely upon the accuracy
95
Item 18.
CHARLESTON COLUMBIA GREENVILLE MYRTLE BEACH ASHEVILLE CHARLOTTE GREENSBORO RALEIGH WIL MINGTON ATLANTA SAVANNAH LS3P.COM
and completeness of the services and information furnished by the Owner, consultants, and contractors
including those consultant services required under the International Building Code sections 1703
(Approvals) and 1704 (Special Inspections), as applicab le. The Owner shall identify a representative
authorized to act on the Owner’s behalf with respec t to the Project. The Owner shall render decisions
and approve LS3P’s submittals in a timely manner in order to avoid unreasonable delay in the orderly
and sequential progress of LS3P’s services. The Own er’s Representative is the only person authorized
to act on behalf of the Owner and to make changes t o the scope of work and services under this
Agreement. Any change to the Owner’s representative shall be made in writing and sent to LS3P. Such
representative is as follows:
.1 Name:
.2 Address:
.3 Tel No.:
.4 Email:
The Owner identifies the following financial repres entatives:
Owner’s Finance Director
.1 Name:
.2 Address:
.3 Tel No.:
.4 Email:
Owner’s Accounts Payable Contact
.1 Name:
.2 Address:
.3 Tel No.:
.4 Email:
LS3P will use Newforma Project Center as its project information management software platform. Any
change from or addition to that platform shall be f or the benefit of the Owner and Contractor and will
constitute an Additional Service to be billed as a separate task to the Owner.
F. Termination or Suspension
Either party at any time with or without cause may terminate this Proposal by written notice to the
other. Termination shall be effective seven (7) days after the date the notice is received. Upon effective
termination, all services provided and expenses inc urred up to and including the date of termination
shall be immediately reimbursable, due, and payable to LS3P. Failure of Owner to make payments to
LS3P under this Proposal shall be cause for terminat ion.
In the event of a suspension of services, LS3P shall have no liability for any damages to Owner incurre d
because of such suspension. Termination or suspension of services by LS3P shall in no way relieve Owner
of its obligation to compensate LS3P for services pr ovided and expenses incurred up to and including
the date of termination or suspension. If the Owne r suspends the Project, LS3P shall be compensated
for services performed prior to notice of such susp ension. When the Project is resumed, LS3P shall be
compensated for expenses incurred in the interrupti on and resumption of LS3P’s services. LS3P’s fees
for the remaining services and the time schedules s hall be equitably adjusted.
96
Item 18.
CHARLESTON COLUMBIA GREENVILLE MYRTLE BEACH ASHEVILLE CHARLOTTE GREENSBORO RALEIGH WIL MINGTON ATLANTA SAVANNAH LS3P.COM
G. Ownership of Documents
Designs, drawings, specifications, and other docume nts prepared by LS3P and/or its consultants are
Instruments of Service for use solely with respect to this Project. LS3P and its consultants reserve a ll
respective rights in and to those Instruments of Se rvice including, but not limited to, copyrights.
H. Photography / Job Sign
LS3P reserves the right to photograph the Project an d use said photographs in future promotional
material. Photography sessions will be coordinated with the Owner to avoid distraction during business
hours. The Owner shall allow the Architect to post a sign at the Project site at the Architect’s expe nse
containing the Architect’s name, logo, and contact information. Such sign shall remain at the site during
the design and construction phases of the Project. The Architect shall coordinate the appearance and
location of its sign with those of the other Projec t participants.
I. Insurance
The Owner and LS3P waive all rights against each oth er for damages to the extent covered by property
insurance applicable to this Work except such right s as they may have to proceeds of such insurance
held by the Owner as a fiduciary. The Owner shall cause the general liability insurance policies issu ed
to the Contractor(s) and its subcontractors providi ng construction related activities in connection wi th
the Project to list LS3P and its consultants as addi tional insureds under those policies by way of ISO
endorsement CG 20 32 or its equivalent. The Owner agrees to maintain general liability coverage in the
amount of $1,000,000.00 per occurrence and in the aggregate f or the duration of the Project. The
Owner agrees to name LS3P and its consultants as add itional insureds on its general liability policy
providing coverage to this Project.
J. Third Party Claims
This Proposal shall not create any right, remedy, r elationship, and/or cause of action in any third pa rty.
K. Means, Methods, Schedule, and Safety
LS3P has no control over, charge of, or responsibili ty for hazardous materials or the means, methods,
schedule, and/or safety in connection with this Pro ject. LS3P and LS3P's consultants shall have no
responsibility for the discovery, presence, handlin g, disposal of, or exposure of persons to hazardous
materials or toxic substances in any form at the Pr oject Site. LS3P or their consultants shall not be held
liable for any hazardous materials or toxic substan ces related claim. The Owner will have all hazardo us
materials or toxic substances removed independently before construction begins. If any additional
hazardous material or toxic substances are encountered during the course of the work, the Owner shall
be responsible for providing industrial hygienist s ervices necessary to carry out abatement, removal, or
encapsulation of the material. LS3P or LS3P's consul tants shall not be held liable for the discharge or
release of contaminants or other pollutants. The O wner agrees to indemnify and hold harmless LS3P
and its consultants from and against all third-part y claims related to hazardous materials and/or toxi c
substances.
97
Item 18.
CHARLESTON COLUMBIA GREENVILLE MYRTLE BEACH ASHEVILLE CHARLOTTE GREENSBORO RALEIGH WIL MINGTON ATLANTA SAVANNAH LS3P.COM
L. Notices
The only valid addresses for receipt of notice are as follows:
LS3P: LS3P ASSOCIATES LTD.
_______________________
_______________________
Owner: _______________________
_______________________
_______________________
M. Basis of Opinion
Projects requiring observation and reporting of existing structures may have conditions concealed from
view that differ from available documentation or other information. LS3P is not responsible for the costs
or delays resulting from the later discovery of such actual conditions.
This Proposal and any subsequent
representation is a statement of professional opini on based on the information available during the
assessment and/or evaluation of the subject property. Such opinion is formed by the judgment of LS3P
from the knowledge of available facts and other inf ormation. This Proposal and any subsequent
representation only reflect the conditions on the d ay of site observation. The Owner hereby
acknowledges that existing conditions can and will change relative to the information contained in thi s
Proposal and/or any subsequent representation.
N. Payment
Design Services will be billed monthly in accord with the percentage of work complete and the terms of
compensation. Additional Services by LS3P, Addition al Services by consultants, and/or reimbursable
expenses shall be billed monthly based upon accrued amount including mark-ups. The Owner shall pay
LS3P the balance due upon receipt of invoice. If un paid invoices become more than sixty (60) days
overdue, LS3P may, upon seven (7) days written notice to the Owner, contact the Owner directly for
payment and/or stop work until payment is received. In the event of non-payment, Owner shall
reimburse LS3P for any attorney’s fees incurred to c ollect the unpaid receivables. LS3P will begin work
on this Project once the Proposal signed by both pa rties have been received. Payments on this Project
should be sent directly to:
LS3P ASSOCIATES LTD.
PO Box 96327
Charlotte, NC 28296
O. Enhanced Construction Phase Services
The Owner agrees that Work will progress during the period between LS3P’s Basic Construction Phase
Services site visits that can and will be concealed from view during subsequent site visits, resulting in
Work that LS3P is unable to observe. If the Owner desires to reduce the amount of concealed Work that
LS3P is unable to observe, LS3P shall provide Enhance d Construction Phase Services as Additional
Services as indicated by the Owner:
___ Visit the site one (1) time per week;
98
Item 18.
CHARLESTON COLUMBIA GREENVILLE MYRTLE BEACH ASHEVILLE CHARLOTTE GREENSBORO RALEIGH WIL MINGTON ATLANTA SAVANNAH LS3P.COM
___ Visit the site two (2) times per week;
___ Visit the site every “work day” as outlined in the Contractor’s construction schedule; or
___ Provide “full time” site representation for th e duration of the construction.
The Owner further agrees that LS3P explained the ben efits of Enhanced Construction Phase Services to
the Owner. If the Owner voluntarily elected not to engage LS3P to perform such services, then the
Owner agrees that without Enhanced Construction Pha se Services the Project may experience
scheduling, budget, and/or coordination problems wh ich will be more difficult and more costly to
remedy than prevent.
II. STANDARD BILLING PROVISIONS
LS3P provides Architecture, Interiors, and Planning Services on a time and materials basis as follows:
1. Compensation for Services provided by LS3P personnel shall be at the following hourly rates:
Senior Officer / Principal $250
Officer Principal $225
Senior Project Manager $215
Project Manager $190
Senior Architect / Senior Interior Designer $175
Architectural Staff III / Interior Design Staff III / Design Staff III $150
Architectural Staff II / Interior Design Staff II / Design Staff II $135
Architectural Staff I / Interior Design Staff I / D esign Staff I $120
Designer $110
Senior Technician $135
Technician $110
Administrative $75
2. For Services of Professional and Engineering Consul tants including but not limited to Structural, Civi l,
Mechanical, Electrical, Plumbing, and Surveying Ser vices, a multiple of 1.15 times the amount billed to
LS3P will apply.
3. Minimum billable time for Depositions and Testimony is One-Half Day.
4. Billing will occur monthly or at the completion of the work, whichever comes sooner, with payments
due upon receipt.
99
Item 18.
CHARLESTON COLUMBIA GREENVILLE MYRTLE BEACH ASHEVILLE CHARLOTTE GREENSBORO RALEIGH WIL MINGTON ATLANTA SAVANNAH LS3P.COM
5. After thirty (30) days from the date of invoice, payments due and unpaid shall bear a late charge of one
and one half percent (1.5%) per month from the date o f invoice.
6. This standard schedule is subject to change 6 months from date of issuance.
7. Reimbursable Expenses (i.e., Travel, Reproductions, Printing, Plots, Postage, Handling and Delivery,
Facsimile, Long Distance Communications, Renderings , Models, etc.), incur a multiple of 1.1 times the
amount expended by LS3P. All air travel greater tha n three hours in scheduled duration will be booked
in Comfort + Class or equivalent. For limited quantities of in-house print or electronic media production,
the following billing rates will apply:
Black & White Bond Premium Bond Black & White Scan s
30” x 42” $2.00 $3.00 $2.50
24” x 36” $1.00 $2.00 $2.00
15” x 21” $0.50 $1.00 $1.25
11” x 17” $0.25 $0.50 $0.25
8.5” x 11”/14” $0.10 $0.20 $0.15
Color Premium Bond Satin or Gloss High Res. Color Scans
30” x 42” $45.00 $60.00 $20.00
24” x 36” $30.00 $45.00 $20.00
15” x 21” $20.00 $30.00 $20.00
11” x 17” $1.00 $1.25 $1.00
8.5” x 11”/14” $0.65 $0.75 $0.75
Electronic Internet CD DVD
Data Transfer No Charge $15.00 $25.00
Facsimile No Charge
Email / FTP No Charge
Large quantity reproductions, blue-line prints, bla ck-line prints, sepia prints, high resolution scans , and
other special graphic media formats will be outsour ced at vendor pricing plus customary 10% markup.
8. Digital Reproduction of Documents and Instruments of Service (limited to computer generated drawings
and not to be considered Contract Documents as defined by the General Conditions for the Contract for
Construction) may be obtained for specific qualifie d purposes with appropriate authorization and
subject to an LS3P Letter of Agreement stating Terms and Conditions for release. Drawing Sheets
prepared using Autodesk® Revit®, Autodesk® AutoCAD®, an d Bentley® MicroStation® application
software shall have the following per sheet billing rates as Digital Documents:
100
Item 18.
CHARLESTON COLUMBIA GREENVILLE MYRTLE BEACH ASHEVILLE CHARLOTTE GREENSBORO RALEIGH WIL MINGTON ATLANTA SAVANNAH LS3P.COM
Electronic Files Formats Per Sheet
DWG (Autodesk® Drawing File) $30.00
DGN (Bentley® Design File) $30.00
DXF (Autodesk® Data Exchange File) $30.00
DWF (Autodesk® Design Web Format) $10.00
PDF (Adobe® Portable Document Format) $4.00
Autodesk Revit and AutoCAD drawing files represente d in the DWG and DXF file formats and Bentley
MicroStation design files represented in the DGN fi le format are viewable, printable and editable usin g
application software. Autodesk Design Web Format o r DWF files and Adobe® Portable Document Files or PD F
files formats are viewable and printable using Auto desk Design Review and Adobe Acrobat Reader,
respectively. These software viewers are available as free downloads. DWF and PDF file formats are n ot
editable and may be scaled, red-lined or otherwise marked up without changing the original files. Add itional
charges for file format conversion may apply.
101
Item 18.
Source: Beaufort County website. First collected Nov 21, 2026.