Public Facilities and Safety Committee — Agenda Packet
Beaufort County · Beaufort County · Public Facilities Committee · meeting of Mar 27, 2023 · Agenda packets
Open the original document More from Beaufort County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, March 27, 2023
3:00 PM
AGENDA
COMMITTEE MEMBERS:
BLOGAN CUNNINGHAM, CHAIRMAN DAVID P. BARTHOLOMEW, VICE-CHAIRMAN
THOMAS REITZ PAULA BROWN
ANNA MARIA TABERNIK JOSEPH F. PASSIMENT, EX-OFFICIO
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. PUBLIC NOTIFICATION OF THIS MEETING HAS BEEN PUBLISHED, POSTED, AND DISTRIBUTED IN
COMPLIANCE WITH THE SOUTH CAROLINA FREEDOM OF INFORMATION ACT
4. APPROVAL OF AGENDA
5. CITIZEN COMMENT PERIOD- 15 MINUTES TOTAL
Anyone who wishes to speak during the Citize n Comment portion of the meeting will limit their
comments and speak no longer than three (3) minutes. Speakers will address Council in a respectful
manner appropriate to the decorum of the meeting, refraining from the use of profane, abusive, or
obscene language.
AGENDA ITEMS
6. UPDATE ON AIRPORT TERMINAL IMPROVEMENT
7. RECOMMEND APPROVAL OF A RESOLUTION RECOGNIZING FAIR HOUSING MONTH
8. RECOMMEND APPROVAL OF A RESOLUTION TO ACCEPT A 30,000 GRANT FROM AMERICAN SOCIETY FOR
THE PREVENTION OF CRUELTY TO ANIMALS (ASPCA) FOR DISASTER RESPONSE
9. RECOMMEND APPROVAL TO AWARD RFQ FOR ON-CALL RIGHT OF WAY SERVICES
10. RECOMMEND APPROVAL TO AWARD KIMLEY HORN CONTRACT FOR ENGINEERING SERVICES TO CHERRY
POINT ROAD AND THE INTERSECTION OF SC 170 ($162,752)
1
County Council Agenda – Beaufort County, SC
11. RECOMMEND APPROVAL TO AWARD MEAD & HUNT CONTRACT FOR ENGINEERING SERVICES FOR THE SC
46 WIDENING PROJECT ($1,053,734.19)
12. ADJOURNMENT
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
2
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
A RESOLUTION RECONIZING FAIR HOUSING MONTH
MEETING NAME AND DATE:
Public Facilities and Safety Committee
March 27th, 2023
PRESENTER INFORMATION:
Audra Antonacci – Ogden, ACA
5 Minutes
ITEM BACKGROUND:
April is nationally recognized as Fair Housing Month. All Community Block Grant/Economic
Grantees are required to certify that the local government will undertake an action to
affirmatively further fair housing.
PROJECT / ITEM NARRATIVE:
A Resolution Recognizing Fair Housing Month is required annually.
FISCAL IMPACT:
N/A
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval of the Fair Housing Month Resolution
OPTIONS FOR COUNCIL MOTION:
Motion to approve a Resolution to Recognize Fair Housing Month
Motion to deny a Resolution to Recognize Fair Housing Month
3
Item 7.
RESOLUTION 2023/_____
A RESOLUTION RECONIZING THE POLICY SUPPORTING HOUSING FOR ALL
NOT ONLY DURING FAIR HOUSING MONTH, BUT THROUGHOUT THE YEAR
Whereas, March 27th 2023, marks the 55th anniversary of the enactment of the Civil Rights
Act of 1968, Title VIII of which (42 U.S.C. 3601 et seq.) commonly known as the Fair Housing
Act; and
Whereas, the State of South Carolina enacted the South Carolina Fair Housing Law in
1989 supporting the policy of Fair Housing without regard to race, color, creed, national origin,
sex, familial status, and handicap, and encourages fair housing opportunities for all citizens; and
Whereas, the County Council of Beaufort County is committed to addressing
discrimination in our community, supporting programs that will educate the public about the rights
to equal housing opportunities, and planning partnership efforts with other organizations to help
assure every citizen of their right to fair housing; and
Whereas, the County Council of Beaufort County rejects discrimination on the basis of
race, religion, color, sex, national origin, disability, and/or familial status in the sale, rental, or
provision of other housing services, and
Whereas, the County Council of Be aufort County desires that all its citizens be afforded
the opportunity to attain a decent, safe, and sound living environment.
NOW THEREFORE, IT IS HEREBY RESOLVED, that the County Council of Beaufort
County does hereby designate April 2023 as Fair Housin g Month and recognizes the policy
supporting Fair Housing in encouraging all citizens to endorse Fair Housing opportunities for all
not only during Fair Housing Month, but also throughout the year.
Adopted this _____ day of _________________, 2023
COUNTY COUNCIL OF BEAUFORT COUNTY
_________________________________________
Joseph Passiment, Chairman
Clerk to Council
____________________
Sarah Brock
4
Item 7.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Resolution
MEETING NAME AND DATE:
Public Facilities and Safety Committee
PRESENTER INFORMATION:
John Robinson Public Safety Assistant County Administrator
2 minutes
ITEM BACKGROUND:
ASPCA (American Society for the Prevention of Cruelty to Animals) $30,000 grant for Disaster
Response
(Council Vote History, etc.)
PROJECT / ITEM NARRATIVE:
FISCAL IMPACT:
$0 impact, no matching funds required
STAFF RECOMMENDATIONS TO COUNCIL:
Recommend send to full council for acceptance.
OPTIONS FOR COUNCIL MOTION:
Motion to approve a resolution to accept $30,000 grant funds from the ASPCA (American Society for
the Prevention of Cruelty to Animals) for Disaster Response.
Move forward to council for April 10, 2023
5
Item 8.
RESOLUTION 2023 / 12
A RESOLUTION TO ACCEPT THE 202 2 AMERICAN SOCIETY FOR THE
PREVENTION OF CRUELTY TO ANIMALS DISASTER RESPONSE GRANT OF
$30,000 FOR IMPROVING DISASTER RE SILIENCE EFFORTS IN BEAUFORT
COUNTY SOUTH CAROLINA.
WHEREAS, Beaufort County Council is in good standing with the American Society for
the Prevention of Cruelty to Animals (ASPCA) and submitted the application on October 26, 2022.
WHEREAS, Beaufort County Animal Control Services received notification of the grant
award on December 12, 2022. This award is to be used exclusively for costs incurred directly in
connection with disaster preparation, mitigation, and recovery efforts by Beaufort County Animal
Services for the preservation and care of domestic and livestock animals in Beaufort County South
Carolina.
WHEREAS, the Beaufort County Animal Control Services staff will execute the grant’s
requirements during the calendar year 202 3 and complete all applicable reporting deadlines that
are specified in the award.
NOW, THEREFORE, BE IT RESOLVED by the County Council of Beaufort County,
South Carolina that:
County Council hereby approves the acceptance of the 202 2 American Society for the
Prevention of Cruelty to Animals Disaster Res ponse Grant Award in the amount of
$30,000.
Adopted this ____ day of April 2023.
COUNTY COUNCIL OF BEAUFORT COUNTY
By:
Joseph Passiment, Chairman
ATTEST:
______________________________
Sarah W. Brock, Clerk to Council
6
Item 8.
520 8th Avenue · 7th Floor · New York, NY 10018 · grants @aspca.org
P a g e | 1
Grant Agreement Reference:
NAME: Beaufort County Animal Services
PROJECT: 2022 ASPCA Disaster Response Grant
AMOUNT: $ 30,000
GRANT NUMBER: 202210-29892
GRANT EFFECTIVE DATE: 12/10/2022
GRANT EXPIRATION DATE: 12/31/2023
ASPCA GRANT OFFICER: Tim Rickey
ASPCA GRANT MANAGER: Ellen Vancelette
December 12, 2022
Tallulah McGee
Post Office Drawer 1228
Beaufort, SC 29901
Dear Tallulah McGee,
The American Society for the Prevention of Cruelty to Animals (the “ASPCA”) is deeply honored to
be able to grant to Beaufort County Animal Services (the “Grantee,” and together with the ASPCA,
the “Parties” and each a “Party”) the amount of $ 30,000 (the “Grant”). These funds are designated for
2022 ASPCA Disaster Response Grant, as described in the Grant request, the Grant Request
Documents, and, if applicable, its amendments (the “Project”) and subject to the terms of this
agreement (the “Agreement”).
Unless otherwise noted in the payment schedule below, the ASPCA shall issue the Grant to the Grantee
approximately two to six weeks following receipt of the signed original contract, including all pages.
By signing this Agreement, you represent and warrant that Grantee will meet the obligations specified
in this Agreement.
Intending to be legally bound and in consideration of the Grant provided to the Grantee and the desire
of the Grantee to conduct the Project, the parties hereby agree to the following te rms and conditions
as of the first date listed above (the “Effective Date”):
DocuSign Envelope ID: 420C8301-2AB7-4275-BA84-D0E5FFDF21B1
7
Item 8.
520 8th Avenue · 7th Floor · New York, NY 10018 · grants @aspca.org
P a g e | 2
1. Grant Requirements. The ASPCA shall pay the Grant to the Grantee according to the following
schedule:
Payment ID Due at Amount Due
21352143 12/10/2022 $ 30,000
Payment is contingent upon ASPCA’s receipt of the signed Agreement from Grantee . The ASPCA
will not advance Grant payment until all required documents have been received and reviewed.
The Grantee acknowledges and agrees that the Grant shall be used exclusively f or costs incurred
directly in connection with the Project and as set forth in this Agreement, and that failure to do so will
result in the Grantee having to return the Grant to the ASPCA within ten (10) days of the ASPCA’s
request to do so.
The Grantee a cknowledges and agrees that any proposed changes to the Project , including, but not
limited to, the Project goals and objectives, the use or purpose of funds, the distribution of funds across
approved budget items, or any other substantive changes to the Project shall be fully approved by the
Grant Officer and memorialized with an amendment to the Agreement prior to initiating any such
changes.
Unless Grantee is expressly exempt from this requirement (e.g. as an agency or instrumentality of
government), it shall meet the ASPCA Grantee Organizational Standards (the “Standards”), attached
hereto as Schedule 1. If Grantee does not meet the standards by the Effective Date, the ASPCA may,
in its sole discretion, grant additional time for the Grantee to come into compliance with the Standards.
If additional time is granted, Grantee shall have 12-months or until the Expiration Date, whichever is
sooner, to comply with the requirements and provide proof of compliance as a part of its required
reporting.
The Grantee agrees that at no time will any funds it receives from the ASPCA be used to attempt to
influence the outcome of any selection, nomination, election, or appointment of any individual to any
public office or office of a political organization within the meaning of Internal Revenue Code Section
527(e)(2), and shall furthermore not use any of the funds it receives from the ASPCA to participate in,
or intervene in (including the publishing or distributing of statements) any political campaign on behalf
of (or in opposition to) any candidate for public office.
For projects that include grant funds used to purchase food for a gathering of individuals, the Grantee
will limit the use of ASPCA funds to purchase vegetarian, vegan, fish or welfare -certified meat
products only. “ Welfare-certified meat products” shall mean products that are from farms, obtained
either directly or through another supplier (restaurant, retailer, etc.), that are certified by at least one of
the following certification programs: (a) Animal Welfare Approved; (b) Certified Humane; and/or (c)
Global Animal Partnership, Steps 2 and above. For more information about welfare-certified products
or where to locate welfare-certified products, please visit http://www.aspca.org/take-action/help-farm-
animals/finding-higher-welfare-products.
Employees, volunteers or other associates of the Grantee whose food expenses are reimbursed or
otherwise paid from ASPCA grant funds, including, but not limited to beneficiaries of travel stipends
DocuSign Envelope ID: 420C8301-2AB7-4275-BA84-D0E5FFDF21B1
8
Item 8.
520 8th Avenue · 7th Floor · New York, NY 10018 · grants @aspca.org
P a g e | 3
and scholarships, are strongly encouraged to choose higher -welfare meat products, fish, vegan or
vegetarian food.
Grant Reporting:
The Grantee must submit reports (the “Grant Reports”) to provide the ASPCA with information about
the Project and to ensure the Grant is being used as described in this Agreement. Grant Reports shall
be due per the following schedule and must be submitted through the Grantee’s Fluxx account:
Report Type Due Date
Final Report (as of 2021) 01/14/2024
The Grantee acknowledges it may be subject to additional reporting requirements as assigned by its
ASPCA Grant Officer and set forth in the Grant record in Fluxx (the “Additional Reporting”).
Additional Reporting shall be submitted as a part of the regular Grant Reports.
Grantees that fail to submit required documentation by the Final Report Due Date may jeopardize
future grants and/or grant payments.
Grant Extensions:
Extension requests will not be considered for the Final Report Due Date. However, should the
Grantee need a Grant extension due to unforeseen delays in the Project timeline, Grantee may
request an extension by emailing grants@aspca.org before the Grant Expiration Date. The
ASPCA shall review the Grantee’s request and may grant an extension to the Grant term. If the
ASPCA declines the request for an extension, or if the Project is completed but carries a balance
of unspent funds, the Grantee shall promptly refund and pay back to the ASPCA the
unexpended balance.
Ad Hoc Requirements:
The ASPCA may request additional information regarding the Project. Upon such a request, the
Grantee must provide the requested information in a timely manner. Such additional information may
include but is not limited to receipts, photographs, and press information.
The ASPCA may choose to conduct site visits of the Grantee’s location(s). The Grantee must provide
the ASPCA with access to such locations at a date and time mutually agreed upon by the Parties.
2. Compliance with the Law and Maintenance of Tax-Exempt Status. In carrying out the Project,
the Grantee shall comply with all applicable federal, state and local laws and regulations including but
not limited to all applicable federal, state, and local employment laws, regulations, and rules.
The Grantee agrees that it is the sole employer of all individuals who are compensated in whole or in
part with Grant funds, or whose employment, fellowship or internship position arises in any way as a
direct or indirect result of the Grant (each a “Funded Position”). The Grantee further agrees that it is
DocuSign Envelope ID: 420C8301-2AB7-4275-BA84-D0E5FFDF21B1
9
Item 8.
520 8th Avenue · 7th Floor · New York, NY 10018 · grants @aspca.org
P a g e | 4
exclusively responsible for the classification and engagement of any contractors whose fees and/or
expenses are paid in whole or in part with Grant funds (“Funded Contractor”). Accordingly, the
Grantee agrees that with respect to any Funded Position and/or any Funded Contractor, the Grantee is
exclusively responsible for compliance with, and will comply with, any and all applicable federal, state
and local employment laws, regulations and rules, including, but not limited to, any employer
obligations to: (a) timely pay all wages or other compensation due; (b) withhold and remit employment
taxes; (c) administer any required discipline; (d) provide insurance coverages; (e) prohibit
discrimination or harassment based on any protected characteristic; and (f) provide any required leave
or accommodation. The Grantee acknowledges and agrees that the parties to this Agreement are in the
relationship of Grantor and Grantee, and the use of Grant funds for Funded Posit ions and/or Funded
Contractors does not constitute a joint venture, affiliation, or joint employment relationship of any
kind.
If the Grantee is a 501(c)(3) organization, the Grantee certifies that it is in good standing with the
Internal Revenue Service and shall notify the ASPCA immediately of any change in, or challenge by
the Internal Revenue Service to, its status as a 501(c)(3) tax-exempt organization.
3. License. Each Party hereby grants to the other party a license to use the Party’s name and trademarks
on materials directly related to the activities of the Project and/or the Grant.
All use of the ASPCA name and trademarks must comply with the ASPCA’s style guide. “ASPCA
Trademarks” are: “ASPCA®”, which must always appear in PMS 422 and 021, unless used in
materials that are completely black and white in nature, in which case it may appear in black; and
“The American Society for the Prevention of Cruelty to Animals®”.
4.Acknowledgement of ASPCA Support. In consideration of the Grant, the Grantee may publicly
acknowledge that the Project was made possible through a generous grant from the ASPCA . If the
Grantee chooses to make an acknowledgment, Grantee shall submit any Project acknowledgements
that include the ASPCA’s name or trademarks to press@aspca.org for review and approval prior to its
inclusion in any materials prepared and intended to be distributed regarding the activities of the Project.
No changes on the approved version of any Project acknowledgements shall be instituted by the
Grantee without the prior written approval of the ASPCA . The ASPCA has the right in its sole
discretion to require the Grantee to remove all references to the ASPCA’s involvement if the ASPCA
determines that th e Grantee is not fulfilling its obligations under this Agreement or if for any other
reason the ASPCA determines that it is no longer in the ASPCA’s best interest to be referenced in such
manner.
For further assistance regarding recognition of the Grant, including press releases, advisories, or
general media outreach, please contact the ASPCA’s Media Department at press@aspca.org or visit
https://www.aspcapro.org/media-and-promotional-materials-aspcar-grant-recipients for press release
templates, logos, and other media materials.
5. Records. The Grantee will keep accurate books and records with respect to the grant in
accordance with Generally Accepted Accounting Principles (GAAP) and business practices. The
Grantee will keep records of receipts and expenditures made of Grant funds as well as copies of the
reports submitted to the ASPCA and supporting documentation for at least three (3) years after
completion of the use of the Grant funds, and will furnish or make available such books, records, and
DocuSign Envelope ID: 420C8301-2AB7-4275-BA84-D0E5FFDF21B1
10
Item 8.
520 8th Avenue · 7th Floor · New York, NY 10018 · grants @aspca.org
P a g e | 5
supporting documentation to the ASPCA for inspection at reasonable times from the time of the
Grantee’s acceptance of the Grant through such period.
6. Termination. The ASPCA may, in its sole discretion (i) withhold payment of funds until in its
opinion the situation has been corrected or (ii) declare the Grant terminated in any of the following
circumstances:
a. If, as the result of the consideration of reports and information submitted to it by the Grantee
or from other sources, the ASPCA, in its sole discretion, determines that continuation of the
Project is not reasonably in furtherance of the ASPCA’s mission to provide effective means for
the prevention of cruelty to animals throughout the United States (the “ASPCA Mission”) or
that the Project is not being executed in substantial compliance with the grant request (or work
plan as revised) or that the Grantee is incapable of satisfactorily completing the work of the
Project;
b. In the case of any violation by the Grantee of the terms and conditions of this Agreement;
c. In the event of any change in, or cha llenge by the Internal Revenue Service to, the Grantee’s
status as a 501(c)(3) tax-exempt organization if applicable; or
d. If it is revealed that, during the Project, the Grantee is or was involved in any activity or makes
any statement disparaging of, or re flecting unfavorably upon the ASPCA, tarnishes the
reputation of the ASPCA or is not in alignment with the ASPCA Mission.
If the ASPCA terminates the Grant, it shall so notify the Grantee, whereupon it, if so requested by the
ASPCA, shall promptly refund and pay back to the ASPCA any unexpended balance of the Grant
funds in the Grantee’s hands or under its control or any expended Grant funds deemed to have been
misappropriated per the terms of this Agreement.
Upon completion of the Project or terminatio n of this Agreement for any reason, the ASPCA will
withhold any further payments of Grant funds . All such determinations by the ASPCA under this
Section 6 will be final, binding and conclusive upon the Grantee.
7. Future Funding. The Grantee acknowledges that the ASPCA and its representatives have made no
actual or implied promise of funding except for the amounts specified in this Agreement. If any of the
Grant funds are returned or if the Grant is rescinded, the Grantee acknowl edges that the ASPCA will
have no further obligation to the Grantee in connection with this Grant as a result of such return or
rescission.
8. Miscellaneous. This Agreement is intended to be binding upon the Grantee and the ASPCA. This
Agreement represents the final agreement between the parties with respect to the subject matter hereto,
and supersedes any and all prior agreements, written or oral, between the parties with respect to the
matters contained herein. This Agreement is not intended to, nor shall it be deemed to create, any
partnership or joint venture between the Grantee and the ASPCA. This Agreement shall be interpreted,
governed by and construed in accordance with the internal laws of the State of New York, without
regard to the conflict of laws principles thereof. The parties hereto acknowledge and consent to
personal jurisdiction and venue exclusively in New York, New York with respect to any a ction or
proceeding brought in connection with this Agreement. This Agreement may be executed by the
parties hereto in counterparts, each of which, when executed and delivered, shall be deemed to be an
original and all of which shall constitute together the same document.
DocuSign Envelope ID: 420C8301-2AB7-4275-BA84-D0E5FFDF21B1
11
Item 8.
520 8th Avenue · 7th Floor · New York, NY 10018 · grants @aspca.org
P a g e | 6
If the terms and conditions of this Agreement are acceptable, please sign this Agreement and return it
to us. By signing this Agreement, you represent and warrant that you are capable of binding the
Grantee to the terms set forth in this Agreement.
Sincerely,
THE AMERICAN SOCIETY FOR THE PREVENTION OF CRUELTY TO ANIMALS
______________________________
Lauren Martin
Vice President, Deputy General Counsel
ACCEPTED AND AGREED:
Beaufort County Animal Services
By (signature of CEO/President/Director): _____________________________________________________
Name/Title: _____________________________________________________________________________
DocuSign Envelope ID: 420C8301-2AB7-4275-BA84-D0E5FFDF21B1
Tallulah Trice Director
12
Item 8.
520 8th Avenue · 7th Floor · New York, NY 10018 · grants @aspca.org
P a g e | 7
Schedule 1
ASPCA Grantee Organizational Standards
Must have at least 4 board members
Majority of the board must be independent1
Chairperson and Treasurer shall not be compensated
Business registration must be current/active in the Grantee’s state of incorporation
Charitable registration must be current/active in the state of the Grantee’s primary location
(for grants =>$25,000)
No overdue reports for any ASPCA grants, if applicable
No overdue balances on prior grants, if applicable
1 This means that fewer than half of Grantee’s Board members may be paid employees and/or family members or close
relatives.
DocuSign Envelope ID: 420C8301-2AB7-4275-BA84-D0E5FFDF21B1
13
Item 8.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation to Award RFQ 122022E On-Call Right of Way Services
MEETING NAME AND DATE:
Public Facilities and Safety Committee – March 27, 2023
PRESENTER INFORMATION:
Jared Fralix, Assistant County Administrator – Infrastructure
(5 mins)
ITEM BACKGROUND:
On November 18, 2022, Beaufort County Transportation Engineering Department published a solicitation to
contract with up to 5 qualified consultants experienced in providing right of way services for the purpose of
acquiring right of way on various projects throughout Beaufort County which could include local and state
maintained road projects and Stormwater management projects.
PROJECT / ITEM NARRATIVE:
5 responsive submissions were received on December 20, 2022, and reviewed by an evaluation team which
determined the most qualified firms to be:
1. Michael Baker International
2. THC
3. ORC
4. Telics
5. Freehold Focus
FISCAL IMPACT:
The on-call consultants will provide proposals for each project they are assigned and will be brought before
Committee and Council as outlined in the Beaufort County Procurement Code. The project will determine the
funding source which could include, but not limit to, Road Use Fees, Impact Fees, C-Funds, Grants, Sales Tax,
and any future funding source available for traffic and transportation projects. Amounts expended in each
contract will not exceed budgeted amounts for the services rendered.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award RFQ 122022E On-Call Right of Way Services
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny recommendation to award RFQ 122022E On-Call Right of Way Services.
Next Step: Move forward to County Council for recommendation to award RFQ 122022E On-Call Right of Way
Services.
14
Item 9.
RFQ 122022E
Summary Score Sheet
Evaluators Name of Company Name of Company Name of Company Name of Company 2 Name of Company 3
Freehold Focus Telics ORC
Michael Baker
International THC
Meetze 62 79 85 85 89
Ward 68 59 68 75 66
Wilson 78 78 79 85 83
TOTALS: 208 216 232 245 238
1. Michael Baker International 245
2. THC 238
3. ORC 232
4. Telics 216
5. Freehold Focus 208
On Call Right Of Way Services
15
Item 9.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of Award to Kimley Horn for Engineering Services to Cherry Point Road and the Intersection
of SC 170 ($162,752)
MEETING NAME AND DATE:
Public Facilities and Safety Committee
PRESENTER INFORMATION:
Jared Fralix, PE – ACA Infrastructure Division
Eric Claussen, PE, PTOE – Director of Engineering, Alternative
(5 mins)
ITEM BACKGROUND:
Kimley Horn is one of the award firms for Beaufort County’s On-Call Traffic Consultants RFQ#083021E
and asked to provide a scope and fee for engineering services related to improvements along Cherry
Point Road and the intersection of SC 170. The improvements include widening Cherry Point Road
from its intersection with SC 170 to Okatie Elementary School to include storage lanes for school
traffic. Additionally, conceptual level engineering design for the intersection of SC 170 to include the
long-term improvements along the corridor as identified in the LATS SC 170 Study.
PROJECT / ITEM NARRATIVE:
Cherry Point Road
Widening from a 2-lane road to 5-lane road from SC 170 to the Okatie Elementary School Driveway
A “Through-Cut” intersection design at SC 170 with the following:
2 receiving lanes at the intersection with SC 170
2 left turn lanes at the intersection of SC 170 with a storage to be determined
Right turn lane at the intersection of SC 170 with a storage to be determined
SC 170
An additional left turn lane from SC 170 to Cherry Point Road with a storage to be determined
FISCAL IMPACT:
The contract fee is lump sum in the amount of $154,320. Staff recommends a 10% contingency of
$15,432, bringing the project total cost to $169,752. The funding for this project is Capital Funds
approved in the 2022/41 Budget Amendment Ordinance – account 10401243-54500 with a balance
of $5,852,448.23.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award the contract for Engineering Services to Cherry Point Road and
the intersection of SC 170 to Kimley Horn
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny recommendation to award the contract for Engineering Services to Cherry
Point Road and the intersection of SC 170 to Kimley Horn.
Next Step: As the contract is less than $200,000, the approval of County Council is not need. Staff will
proceed with executing the contract.
16
Item 10.
17
Item 10.
Page 1
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
February 23, 2023
Eric Claussen, PE, PTOE
Director of Engineering
Beaufort County Engineering
PO Drawer 1228
Beaufort, SC 29901
RE: Professional Services Proposal for Cherry Point Road Widening and Intersection with SC
170 – Beaufort County, South Carolina
Eric,
Kimley-Horn and Associates, Inc. (“Kimley-Horn” or “the Consultant”) is pleased to submit this letter
proposal (the “Proposal”) to Beaufort County (“the Client”) for providing transportation and roadway
engineering services related to the widening of Cherry Point Road and intersection improvements of
Cherry Point Road with SC 170 in Beaufort County, South Carolina. Our project understanding, scope
of services, schedule, and fee are described below.
PROJECT UNDERSTANDING
It is our understanding that the Client would like to widen Cherry Point Road from its intersection with
SC 170 to Okatie Elementary School. Depending on any storage lengths needed, Cherry Point Road
will taper back into a 2-lane road after Okatie Elementary School and will be resurfaced to the
residential development. Due to the widening, the intersection of Cherry Point Road and SC 170 will
need improvements as well. Kimley-Horn will design intersection improvements and provide a
conceptual level intersection design for future SC 170 improvements planned by Beaufort County.
The scope of services for the improvements are defined below:
SCOPE OF SERVICES
Task 1 – Intersection Capacity Analysis
Data Collection
Kimley-Horn will utilize a subconsultant to collect peak hour (6-9 AM and 3-6 PM) turning movement
counts at the following study area intersections:
· SC 170 at Cherry Point Road
· Cherry Point Road at Okatie Elementary School
Field Investigation
The two (2) intersections listed above will be inspected by Kimley-Horn via aerial photography to collect
geometric information specific to each location. Following aerial inspection, Kimley-Horn will conduct a
field review of the intersections.
Intersection Capacity Analysis
18
Item 10.
Page 2
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
Kimley-horn will prepare a detailed intersection capacity analysis for the AM and PM peak hours using
Synchro Version 11 at the intersections of:
· SC 170 (Okatie Highway) at Cherry Point Road
· Cherry Point Road at Okatie Elementary School
The capacity analysis will utilize the exiting peak hour traffic volumes and horizon year traffic volumes
to determine deficiencies with the existing intersection configurations. The horizon year will be
determined based on coordination with the Client. Kimley-Horn will model SC 170 under existing
conditions with a through-cut on Cherry Point Road and Kimley-Horn will model SC 170 under future
conditions studied in the AECOM SC 170 corridor study. Approved development traffic data will be
coordinated with Beaufort County. To date Kimley-Horn is aware of the following approved
developments along/near Cherry Point Road:
· Cherry Point Mixed-Use TIA – Kimley-Horn, July 2022
· Malind Bluff Development – Bihl Engineering, August 2019
· Okatie Village Development – Bihl Engineering, date unknown
· Speedway Gas/Convenience Store Development – Qk4, Inc, February 2020
These approved developments will be included in the Synchro analysis. The Synchro and resulting
SimTraffic analysis will be used to determine storage lengths for the Roadway Design in Task 2. Kimley-
Horn will utilize the Synchro models developed for the Cherry Point Mixed-Use TIA (Kimley-Horn, July
2022) as a base condition.
Task 2 – Roadway Design
Cherry Point Road
· Widening from a 2-lane road to 5-lane road from SC 170 to the Okatie Elementary School
Driveway
· A “Through-Cut” intersection design at SC 170 with the following:
o 2 receiving lanes at the intersection with SC 170
o 2 left turn lanes at the intersection of SC 170 with a storage to be determined
o Right turn lane at the intersection of SC 170 with a storage to be determined
SC 170
· An additional left turn lane from SC 170 to Cherry Point Road with a storage to be determined
Kimley-Horn will develop roadway permit plans to reflect the design stated above. Permit plans will
consist of the following: cover, general notes, property strip map, typical sections, roadway plans,
profile, cross sections, permanent pavement markings and signing, traffic control plans, storm drainage
improvements and erosion control. Kimley-Horn will prepare reproducible permit plans in general
accordance with County and SCDOT general procedures and policies relating to local roadway design.
Kimley-Horn will utilize SCDOT standard details for roadway, utility and drainage elements, and
pavement markings. The intent of the drainage design will be to substantially maintain the existing
drainage patterns, collection, and conveyance. It is assumed that stormwater improvements
downstream of the roadway work will not be required.
19
Item 10.
Page 3
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
Kimley-Horn will design any stormwater adjustments needed due to the design of the intersection
improvements and widening. Kimley-Horn will create a Hydrology and Hydraulics Analysis Report to
include the stormwater impacts to SCDOT right-of-way and submit that report to SCDOT as part of the
required documentation for the SCDOT encroachment permit.
It is assumed that the utility coordination will be performed by Beaufort County. Kimley-Horn will provide
Beaufort County with the anticipated impacts, and the county will coordinate the impacts with the utility
companies.
It is assumed there will not be any further requirements from either the County or SCDOT for stormwater
quality control beyond traditional stormwater conveyance measures, and as such, Kimley-Horn will not
design a separate BMP for water treatment as a part of the roadway plans. Additional services will be
required if further post construction stormwater devices are required.
Kimley-Horn will prepare a preliminary opinion of probable construction cost (OPCC) using current local
and/or SCDOT unit costs for highway construction. Right-of-way and/or easement acquisition costs will
not be included. Utility relocation costs also will not be included in the OPCC.
Task 3 – Conceptual Intersection Design
Beaufort County has informed Kimley-Horn of future improvements to SC 170. Kimley-Horn will
provide a concept of how the intersection of Cherry Point Road and SC 170 can be updated to
include the future SC 170 improvements when they are implemented.
Kimley-Horn will develop geometric design criteria and horizontal layout for the conceptual
intersection design to include dual right lanes from Cherry Point Rd onto SC 170 and necessary
adjustments to the planned superstreet design on SC 170. The design will follow SCDOT standards.
The layout will be prepared using MicroStation and will use existing aerial mapping and GIS data as a
base. Any previous SCDOT plans in the area will be referenced as well if available.
Conceptual plans will show right-of-way, property, and wetland information based on available GIS
data. One (1) conceptual design alternative will be developed for the proposed improvements.
The conceptual plans will be submitted to the Client for review and comment. Kimley-Horn will
perform one (1) round of changes to the concept based on the comments received. Conceptual plans
will be submitted in an 11”x17” pdf format.
Task 4 – Permitting
Kimley-Horn will submit one (1) electronic copy of the permit plans to SCDOT and the County for review.
Kimley-Horn will attend up to one (1) meeting with SCDOT and up to one (1) meeting with the County
to review the permit plans.
It is assumed that all SCDOT permit plan review for the project will be performed by SCDOT District
staff, and it is assumed that the permit plans will not be sent to SCDOT Headquarters for review.
Kimley-Horn will revise the permit plans in accordance with agency review comments and coordination
with the County and SCDOT.
20
Item 10.
Page 4
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
Kimley-Horn assumes that agency comments will include up to two (2) additional rounds of SCDOT
and County comments before submitting final roadway design drawings. If SCDOT and the County
approves the final plans, Kimley-Horn will submit an electronic copy of the final sealed plans to the
Client for construction.
Task 5 – Survey and Subsurface Utility Exploration (SUE) By Others
At the direction of the Client, Kimley-Horn will contract with Andrews Engineering and ECS to provide
survey and SUE services. Kimley-Horn will coordinate and manage the effort of the survey and SUE
subconsultants as described in the attached proposals provided by the subconsultants. Kimley-Horn
will endeavor to coordinate the subconsultants’ scope of work, schedules, and provide a cursory review
of their deliverables on behalf of the Client.
The Client/Owner acknowledges that Kimley-Horn will not be reviewing the work product of
Subconsultants in detail and will not be liable for it in any way. If the Client has any future claim related
to these services, Client will pursue Subconsultant directly and not Kimley-Horn.
This task does not include Surface Utility Vacuum Excavation services as outlined in the ECS proposal.
If vacuum excavation services are deemed necessary, additional services will be required.
ADDITIONAL SERVICES
Any services not specifically provided for in the above scope, as well as any changes in the scope the
Client requests, will be considered additional services and will be performed at our then current hourly
rates as we agree prior to their performance. Additional services may include services such as:
· Additional opinions of probable cost
· Additional concept designs
· Roadway post-construction stormwater controls (i.e., water quality BMPs) permitting or design
services
· Structural design services
· Box culvert design
· Nonstandard SCDOT headwall Designs
· Retaining wall design
· Environmental services
· Utility Coordination
· Bid phase services
· Construction phase services
· Public Involvement
· Surface Utility Vacuum Excavation (By ECS per attached proposals)
INFORMATION PROVIDED BY THE CLIENT
We shall be entitled to rely on the completeness and accuracy of all information provided by the Client
or the Client’s consultants or representatives. The Client shall provide all information requested by
Kimley-Horn during the project, including but not limited to the following:
21
Item 10.
Page 5
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
· Survey of the project area to include a surface, alignment, utilities, pavement edges, and any
drainage features.
· AutoCAD (.dwg) or Microstation (.dgn) files for the planned improvements for SC 170
SCHEDULE
We will provide our services as expeditiously as practicable to meet a mutually agreed upon schedule.
FEE AND BILLING
Kimley-Horn will perform the Scope of Services for the total lump sum fees below.
Task Fee
Task 1 – Intersection Capacity Analysis $9,245
Task 2 – Roadway Design $62,485
Task 3 – Conceptual Intersection Design $5,990
Task 4 – Permitting $4,500
Task 5A - Survey by Andrew Engineering $47,900
Task 5B – SUE by ECS $14,800
Task 5C – Kimley-Horn Coordination with
Surveyors
$9,400
Total $154,320
Lump sum fees will be invoiced monthly based upon the overall percentage of services performed.
Payment will be due within 25 days of your receipt of the invoice and should include the invoice
number and Kimley-Horn project number.
22
Item 10.
Page 6
kimley-horn.com 115 Fairchild Street, Suite 250, Charleston, SC 29492 843-737-6390
We appreciate the opportunity to provide these services to you. Please contact us if you have any
questions.
Very truly yours,
KIMLEY-HORN
By: Jonathan Guy, P.E., AICP, PTOE Dillon Turner, P.E., PTOE
Vice President Project Manager
Agreed to this day of , _______.
Beaufort County
SIGNED:
PRINTED NAME: _______________________
TITLE:_________________________________
Client’s Federal Tax ID: _______________________
Client’s Business License No.: __________________
Client’s Street Address: _______________________
_______________________
Attachments –
i. Kimley-Horn Man-Hour Estimate
ii. Andrews Engineering - Z23023 Survey Proposal for Cherry Point Road
Route Survey
iii. Andrews Engineering Man-Hour Estimate
iv. ECS Scope of Work for Subsurface Utility Investigation Cherry Point Road
Widening Project. ESP Proposal No. SUE2-23149
23
Item 10.
Cherry Point Road Design- Fee Proposal
Kimley-Horn Staff Hours & Fees
Project Manager/Senior
Professional I
Senior
Professional II Professional Analyst
255.00$ 295.00$ 200.00$ 150.00$
1.1 - Data Collection and Field Observations
PM Kick-Off Meeting 4
Data Collection 1 3 1,000.00$
Field Investigation 1 3
Task 1.1 Hours: 6 0 0 6
Task 1.1 Fees: 1,530.00$ -$ -$ 900.00$ 1,000.00$ 3,430.00$
1.2 - Capacity Anlaysis
Synchro Model Development 1.5 4 11
MOE Summary 1.5 4 12
Task 1.2 Hours: 3.00$ -$ 8.00$ 23.00$
Task 1.2 Fees: 765.00$ -$ 1,600.00$ 3,450.00$ -$ 5,815.00$
9,245.00$
Project Manager/Senior
Professional I
Senior
Professional II Professional Analyst
255.00$ 295.00$ 200.00$ 150.00$
Project Start 1
project folder set up 1
.pcf file 1
Geopak set up 1
Border file 1.5
Cover Sheet 4
General construction notes 3
Typical Sections 8
Geometric layout 8
Sheet Layout 2
Geometric Labeling 6
Existing Ground Profiles 2
Plan Sheet Creation 4
Pavement Marking Design and Labels 4
Signing Design and Labels 4
QC of pavement marking and signing 2
Traffic Control Design 8
Traffic Control Labels and Sheets 8
Geopak Templates 4
Geopak Modeling 30
Surface Creation 3
Cross Sections 4
Cross Section Labeling 2
Cross Section Sheets 2
Drainage Delineation 12
Drainage Calculations 20
Ditch Design 20
Erosion Control Design 10
Drainage Report - Pre & Post Maps for SCDOT ROW 6
Drainage Report - Writing and Tables 4
Drainage Design and labels 6
Drainage Sheets 1.5
ROW Setting and Calcs 10
Property Strip Map 8
Quantities 2 8
Detailed OPCC 5
1st Submittal QC 4 8
1st Submittal Markups 8 15
Design adjustments per agency review #1 18 25
2nd Submittal QC 2 5
2nd Submittal Markups 10
Design adjustments per agency review #2 10 20
Final Submittal QC 1 4
Final Submittal Markups 5
Task 2 Hours: 7 0 152 202.0
Task 2 Fees: 1,785.00$ -$ 30,400.00$ 30,300.00$ -$ 62,485.00$
62,485.00$Kimley-Horn Fee:
Task 2 - Road Design Expenses Task Fees
Task 1 - Intersection Capacity Analysis Expenses Task Fees
Kimley-Horn Fee:
24
Item 10.
Project Manager/Senior
Professional I
Senior
Professional II Professional Analyst
255.00$ 295.00$ 200.00$ 150.00$
Border 2
Aerial from Nearmap 1
Horizontal Design 9
Hatching 5
Formatting 4
QC 2
Markups 4
Design Criteria 2
Task 3 Hours: 0 2 27 0
Task 3 Fees: -$ 590.00$ 5,400.00$ -$ -$ 5,990.00$
5,990.00$
Project Manager/Senior
Professional I
Senior
Professional II Professional Analyst
255.00$ 295.00$ 200.00$ 150.00$
Encroachment permit application 2
permit checklist 2
Authorization letter 1
Pavement Design Coordination 4
Performance Bond Coordination 2
Drainage Statement 2
Submittal #1 3.5
Comment Responses to first review 1.5
Submittal #2 3
Comment Respones to 2nd Reivew 1.5
Task 3 Hours: 0 0 22.5 0
Task 3 Fees: -$ -$ 4,500.00$ -$ -$ 4,500.00$
4,500.00$
Project Manager/Senior
Professional I
Senior
Professional II Professional Analyst
255.00$ 295.00$ 200.00$ 150.00$
Survey Coordination 10 21 15
Task 3 Hours: 0 10 21 15
Task 3 Fees: -$ 2,950.00$ 4,200.00$ 2,250.00$ -$ 9,400.00$
9,400.00$Kimley-Horn Fee:
Task 4 - Permitting Expenses Task Fees
Kimley-Horn Fee:
Task 5 - Survey Coordination Expenses Task Fees
Task 3 - Conceptual Design Expenses Task Fees
Kimley-Horn Fee:
25
Item 10.
2712 Bull Street, Suite A, Beaufort, SC 29902 Phone 843.379.2222 Fax 843.379.2223
February 21, 2023
Dillon Turner
Dillon.Turner@kimley-horn.com
Re: Z23023 Survey Proposal for Cherry Point Road Route Survey
Dear Dillion:
Andrews Engineering Co., Inc. (“AEC” or the “Consult ant”) is pleased to submit this proposal (the “Agre ement”) to
Kimley-Horn (the “Client”) to provide the surveying services as described above.
SURVEYING
1. Surveying Services
a. Prepare the route survey for the Cherry Point Road widening project.
b. The survey will include property lines based on rec orded plats available in the public records and
property corners that are located during the route survey effort, road centerline, drainage features
and structures, and topography within the project limits (see attached map).
c. Prepare the digital terrain model for the project limits.
d. Coordinate with 811 Locates or Subsurface utility engineering consultant to locate the utilities and
provide the utility locations on the route survey.
e. Locate wetland limits based on delineation provided by others.
f. Deliverables will be printed 24”x36” route survey, pdf file, CAD/dwg file.
g. The survey estimate for this project is $47,900.00 .
h. Subsurface Utility Engineering services are offered under a separate proposal provided by ESP
Associates, LLC (see attached proposal).
GENERAL
1. Filing and Permit Fees
a. The Client shall pay all filing and permit fees.
b. The Client shall pay all capacity and impact fees.
2. Printing and Reproduction
c. All sets of plans for permitting, bidding, con struction, etc., will be paid for by the Client at a rate
of $3.00 per 24” x 36” drawing.
d. All special reproduction expenses, shipping expense s, etc., will be paid for by the Client at a rate
of cost x 1.15.
3. Additional Services
e.Additional services are those services not defined within this proposal.
f. The Client is responsible for payment for all services rendered, including agreed upon services not
specifically defined within this proposal.
g. Additional services will be billed at the Consultan t’s standard billing rates, unless otherwise agreed
upon in writing by the Client and Consultant.
h. Any services requiring outside consultants that are paid by Andrews Engineering, Inc., will be billed
to the Client at a rate of cost x 1.15.
i. All special reproduction expenses, shipping expense s, etc., will be paid for by the Client at a rate
of cost x 1.15.
4. Standard Billing Rates
26
Item 10.
Dillon Turner, Kimley-Horn
Z23023 Cherry Point Road
February 21, 2023
Page 2 of 2
2712 Bull Street, Suite A, Beaufort, SC 29902 Phone 843.379.2222 Fax 843.379.2223
Principal $1 65 .00/ hr.
Project Manager $138 .00/ hr.
Engineer $ 95.00 /hr.
Engineer Technician $ 85.00 /hr.
Admin $ 70.00 /hr.
Field Inspector $ 113 .00/ hr.
Professional Land Surveyor $1 20 .00 /hr.
Party Chief $ 85.00 /hr.
GPS Survey Crew $126.00/ hr.
2-Man Survey Crew $1 43 .00/ hr.
Survey Tech $ 85.00 /hr.
5. Terms
a. Invoices will be mailed to the address provided by t he Client for services performed and expenses
incurred. Payment of each invoice is due within 30 days of transmittal. Interest will be added to
accounts not paid within 30 days at a monthly rate of 1.5%.
b. The Client must notify the Consultant in writing of any invoice the Client wishes to dispute or to
request additional billing information. The Client shall have 25 days from the transmittal date of
the invoice to make such notification. After 25 days the Client accepts the invoice as accurate and
complete.
c. If the Client fails to make any payment due to t he Consultant, under this or any other agreement,
within 45 days of the Consultant’s transmittal of i ts invoice, the Consultant may suspend services
until all amounts due are paid in full. All repercu ssions stemming from the suspended services
shall be the sole responsibility of the Client.
d. A collection agency or legal counsel may be retained to assist in the collection of unpaid invoices.
Any charges incurred by the Consultant by these age ncies or entities will be added to the
outstanding balance owed the Consultant.
e.If either party is required to move to enforce this agreement, the parties agree that the moving party
shall be entitled to fees and expenses.
f. The Client agrees that the payment to the Consult ant is not subject to any contingency or condition
including, but not limited to, the sale or acquisition of real property, financing, regulatory approval
or permitting, the work of other professionals, or economic conditions.
Thank you for the opportunity to provide the surveying services as detailed above. Please return an executed copy
of this agreement to our office if it meets your ap proval. This signed agreement will serve as our auth orization to
proceed with this project.
Sincerely,
Steve Andrews, PE
Kimley-Horn Representative Date
27
Item 10.
Principal
Project
Manger
Sr.
Engineer Engineer
Engineer
Tech. Admin
Field
Inspector
Prof. Land
Surveyor
Party
Chief
Survey
Crew
Survey
Tech.
$165 $138 $123 $95 $85 $70 $113 $120 $85 $143 $85
per hour per hour per hour per hour per hour per hour per hour per hour per hour per hour per hour
1 Primary Control Survey 1 4 40 4 6,705.00 $
2 Property Strip Map & Topo 1 6 156 8 23,873.00 $
3 Digital Terrain Model (DTM) 1 1 3 6 36 4,452.00 $
4 Process Survey Data and Mapping 1 6 48 4,938.00 $
5 Property Research and Reference Data 1 4 8 1,325.00 $
6 SurveyWetlands (Delineation by Others) 1 4 4 943.00 $
7
811 Utility Locate Coordiantion & Survey Utility
Markings 2 4 1 24 16 5,640.00 $
8 4 4 4 0 0 0 4 31 0 220 124
9 47,876.00 $
-$
-$
-$
47,876.00 $
SUBTOTAL LABOR BUDGET:
DATE: FEBRUARY 21, 2023 PROPOSAL #: Z23023
Item
No.
Total Labor
Amount Task Description
SURVEYING SERVICES
CHERRY POINT ROAD & SC 170, BEAUFORT COUNTY
PREPARED FOR: KIMLEY-HORN
2712 Bull St, Suite A
Beaufort, SC 29902
www.andrews-sc.com
TOTAL PROJECT BUDGET:
Subsurface Utility Engineering (Separate Proposal)
SUBTOTOAL CONSULTANTS:
Filing Fees
Reimbursable (postage, copies, etc.)
SUBTOTAL REIMBURSALBE EXPENSES:
28
Item 10.
February 15, 2023
Mr. Steve Andrews Engineering, P.E.
Andrews Engineering
2712 Bull St. Suite A
Beaufort, South Carolina 29902
Re: SCOPE OF WORK FOR SUBSURFACE UTILITY INVESTIGATION
Cherry Point Rd. Widening Project
Beaufort County, South Carolina
ESP Proposal No. SUE2- 23149
Dear Mr. Andrews:
ESP Associates, Inc. (ESP) appreciates the opportunity to provide this scope of work for
Subsurface Utility Investigation services for the above referenced project. The basis of
this proposal is from telephone and email correspondences with Mr. Steve Andrews, P.E.
and Mr. Andy Klosterman, P.E. , from Andrews Engineering along with a PDF file
showing the project extents.
PROJECT INFORMATION
We understand that Andrews Engineering will be supporting Kimley-Horn with survey
and design for the intersection improvements and road widening in Beaufort County. The
extent of the SUE i nvestigation includes approximately 2,970 feet of Cherry Point Rd .,
approximately 1,150 feet of SC 170, approximately 300 feet of Pearlstine Rd ., and
approximately 415 feet of Okatie Elementary School’s entrance road. Costs have been
provided to break out the intersection of SC 170 and Pearlstine Rd. portion as a separate
line item from the Cherry Point Rd. and School entrance.
The approximate site limits can be seen in the attached figure provided by Andrews
Engineering.
SCOPE OF SERVICES
I. SUBSURFACE UTILITY INVESTIGATION SERVICES
Our services under this agreement will include the following: ESP Associates will deploy
electromagnetic (EM) pipe and cable locators and ground penetrating radar (GPR) to
determine the approximate horizontal position of detectable utilities along the selected
corridors within the project footprint. The horizontal positions of detectable utilities will
29
Item 10.
Scope of Work for Subsurface Utility Investigation ESP Proposal No. SUE2- 23149
Cherry Point Rd. Widening Project February 15, 2023
ESP Associates, Inc.
2154 North Center Street, Suite E-503 ▪ North Charleston, SC 29406
843.714.2040 ▪ fax 803.802.2515
www.espassociates.com
be marked on the ground using paint and/or pin flags, and a not to scale site sketch will
be provided. The investigation will include all typical utilities with the exception of
gravity systems. Andrews Engineering will be responsible for the survey and m apping
of designated utilities for this project. Due to site conditions, ESP may not be able to
locate all lines. Due caution should be used prior to any excavation work being performed
on site
Our services under this agreement will include the following:
Subsurface Utility Record Research : ESP will contact SC811 to determine which
member utilities have facilities in the project area. ESP will then request records from all
member utility owners with underground facilities within the site limits. If records are
not available, we will request a site meeting to identify the owners’ facilities. Please note
that utility records may take a significant amount of time to receive, up to 2-4 weeks and
may not be received prior to field investigations depending upon project schedule . The
records received may be used to select the final limits for the subsurface utility
investigation outlined below.
Utility Feature Survey: ESP will supplement the project existing conditions survey by
reviewing utility features surveyed and adding any missed features found during our
investigation.
Subsurface Utility Investigation: ESP Associates will deploy EM pipe and cable
locators and GPR to determine the approximate horizontal position of detectable utilities
along the selected corridors within the project footprint. The horizontal positions of
detectable utilities will be marked on the ground using paint and/or pin flags, and a not to
scale site sketch will be provided. The investigation will include all typical utilities except
for gravity systems. Andrews Engineering will be responsible for the survey and mapping
of designated utilities for this project.
ESP will review the utility information and provide comments regarding completeness in
relation to record information and sketches. Any utilities shown on provided records and
not able to be designated will be added to the drawings as data according to record
(DATR).
Subsurface Utility Vacuum Excavation: ESP has been requested to perform vacuum
excavation test holes as a part of this scope of work. Since the number and locations of
test holes is not known at this time, unit rates for vacuum excavation (test holes) services
are included in this scope of work. Test hole information and assumptions provided below
and are based on performing a minimum number of five (5) holes. If fewer test holes are
requested, modified pricing may be required.
Subsurface Utility Vacuum Excavation
Subsurface utility vacuum excavation (potholing) will be performed if requested by
Andrews Engineering.
30
Item 10.
Scope of Work for Subsurface Utility Investigation ESP Proposal No. SUE2- 23149
Cherry Point Rd. Widening Project February 15, 2023
ESP Associates, Inc.
2154 North Center Street, Suite E-503 ▪ North Charleston, SC 29406
843.714.2040 ▪ fax 803.802.2515
www.espassociates.com
o ESP will contact SC811 to request utility marking prior to performing vacuum
excavation.
o ESP will “set-up” each test hole by deploying EM and GPR to designate and
confirm the target utility prior to initiating vacuum excavation activities.
o ESP will set hubs and obtain depth measurements at each test hole location.
Hubs will be surveyed by Andrews Engineering.
o ESP will obtain the utility size, material type where reasonably ascertainable,
and depth of cover to the top of the subject utility at each test hole. A vacuum
excavation test hole report will be prepared for each test hole.
o If air excavation is used, then all spoils removed the test hole will be placed
back in the hole and compacted in 6 -inch lifts. Spoils not suitable for
placement back in a test hole will be removed from the project site. We assume
that no contaminated soils will be present which would require special
equipment decontamination.
o If test holes are in a hard surface (asphalt or concrete) the surface will be
patched using asphalt cold patch or concrete mix. Additional repair
requirements, if required, will be billed at cost 15% and will be approved prior
to performing work.
o Maintenance of traffic (MOT), if required, will be billed at cost plus 15%.
The rates below are for budgeting purposes only as actual cost may vary
depending upon requirements of selected test hole locations.
o The below costs are based upon a minimum of five (5) test holes being
completed. If fewer than five (5) locations are selected, unit costs may need
to be adjusted.
o MOT lane closure costs will be billed separately as a direct cost (cost + 15%).
ESP estimates lane closure cost rates to be approximately $2,500/day. An
estimate for traffic control can be provided once test hole locations have been
selected. If ESP anticipates the need for traffic contr ol after reviewing
selected test hole locations, Client will be notified before proceeding.
FINAL DELIVERABLE
Following completion of the field investigation s, ESP will provide a not-to-scale field
sketch of the areas included in the subsurface utility investigation . Pictures will be
available if requested. Reports will be pr ovided for each vacuum excavation test hole
completed.
31
Item 10.
Scope of Work for Subsurface Utility Investigation ESP Proposal No. SUE2- 23149
Cherry Point Rd. Widening Project February 15, 2023
ESP Associates, Inc.
2154 North Center Street, Suite E-503 ▪ North Charleston, SC 29406
843.714.2040 ▪ fax 803.802.2515
www.espassociates.com
SCHEDULE
Following your approval, ESP will initiate the tasks described above. The subsurface
utility investigation field work will require up to 6 days. A schedule for test holes will be
established if and when the number and locations of test holes are selected. It is assumed
that a typical workday will be no more than 10 hours and no restrictions on working hours
are anticipated. Project deliverables will be provided within 15 business days following
completion of field investigations. If this schedule or scope of work is not satisfactory ,
we will make every effort to modify it to meet your needs. ESP assumes you will be the
recipient of our deliverables and we will not distribute them to any other party without
prior approval from you.
FEE SCHEDULE
Our fees for the above services are shown below:
• Subsurface Utility Engineering Investigation
o Records Research/PM Review: $1,600.00 (Lump sum)
o Subsurface Utility Investigation:
▪ SC170 Centerline to NW and Pearlstine Rd.: $5,500.00
▪ Cherry Point Rd. and School Entrance: $7,700.00
o Total Estimated Fees: $14,800.00
• Subsurface utility vacuum excavation:
o Vacuum excavation-holes- $1,100.00/each (Minimum 5 locations)
o Mobilization/Setup Fee- $1,200.00
o Traffic control- $2,500.00/day (estimated)
ASSUMPTIONS
Our assumptions associated with the scope and fee are provided below:
• If underground utilities are damaged within area of investigation, whether marked
by ESP or not, it is the Andrews Engineering obligation to notify ESP within 48
hours of any damage to allow ESP to investigate the damage. Failure to notify
ESP within 48 hours absolves ESP from any potential liability for claims.
• We assume that all field activities can be performed during normal business
hours. If night or weekend work is required, surcharges may apply.
32
Item 10.
Scope of Work for Subsurface Utility Investigation ESP Proposal No. SUE2- 23149
Cherry Point Rd. Widening Project February 15, 2023
ESP Associates, Inc.
2154 North Center Street, Suite E-503 ▪ North Charleston, SC 29406
843.714.2040 ▪ fax 803.802.2515
www.espassociates.com
• All arrangements regarding site access to lift stat ions and clearing of surface
obstruction from the areas of investigation will be made by Andrews Engineering
before and during the field work.
• Andrews Engineering accepts that a significant amount of marking paint may be
applied to the ground surface duri ng the field work and should notify ESP prior
to the investigation if marking paint should not be applied to any areas.
• Although geophysical methods provide a high level of assurance in determining
the location of subsurface objects, the possibility exists that not all features will
be detected due to depth, size, soil conditions, and other reasons beyond ESP’s
control. For example, utilities present at depths below an instrument’s detection
limit cannot be located. Therefore, it is understood that no non -invasive
instrument is guaranteed to detect 100% of subsurface utilities or other
features. In instances where precise horizontal and vertical is critical, minimally
invasive methods such as vacuum excavation should be utilized to visually inspect
and survey the feature. Therefore, due caution should be used when performing
any subsurface excavation and ESP is not liable for any damages that occur unless
it is demonstrated that the damages occurred as a result of our negligence.
COMPENSATION
Our services will be billed monthly, with payments due upon receipt and considered past
due 30 days following the invoice date. ESP will invoice for out-of-scope expenses
incurred as part of this work at cost plus 15% including, but not limited to, the following:
submittal fees required for approval of the project, printing costs, overnight shipping,
pickup/delivery expenses, travel time, travel expenses, m ileage, and any other expenses
associated with our work. Any services not specifically listed above can be provided at
our prevailing hourly rates at the time the request for such services is made or under a
separately negotiated contract.
AUTHORIZATION
Please indicate your acceptance of our proposal by signing and returning two originals of
this proposal to our office. By acceptance of this proposal, clients are guaranteeing ESP
that owner(s) has/have granted permission for ESP to access the site and p erform the
above tasks. Upon receipt of the signed original agreements, we will execute both
originals, return one original to you, and proceed with the performance of our services. This
instrument contains the entire agreement between the parties and ma y not be altered,
modified, amended, or assigned in any respect except by written instrument signed by all
parties hereto. This proposal may be withdrawn by ESP if not executed within 60 days of
the date of the proposal.
33
Item 10.
Scope of Work for Subsurface Utility Investigation ESP Proposal No. SUE2- 23149
Cherry Point Rd. Widening Project February 15, 2023
ESP Associates, Inc.
2154 North Center Street, Suite E-503 ▪ North Charleston, SC 29406
843.714.2040 ▪ fax 803.802.2515
www.espassociates.com
CLOSING
ESP appreciates the opportunity to provide this scope of work for subsurface utility
engineering services for the above referenced project. If you should have questions
concerning this proposal or if additional information is required, please con tact me at
(843) 697-1571 or wdovell@espassociates.com.
Sincerely,
ESP Associates, Inc.
William Dovell
Department Manager
Scott D. Carney, P.E.
SUE Division Manager
Attachments: Site Limits; ESP Terms & Conditions
34
Item 10.
Scope of Work for Subsurface Utility Investigation ESP Proposal No. SUE2- 23149
Cherry Point Rd. Widening Project February 15, 2023
ESP Associates, Inc.
2154 North Center Street, Suite E-503 ▪ North Charleston, SC 29406
843.714.2040 ▪ fax 803.802.2515
www.espassociates.com
Site Limits
35
Item 10.
Statement of Terms and Conditions
Page 1 of 3
ESP Terms & Conditions 2014 (version 4)
PREAMBLE: THIS CONTRACT CONTAINS
LIMITATIONS OF WARRANTY AND LIABIL ITY,
AMONG OTHER THINGS. YOU ARE ADVISED TO
READ THIS DOCUMENT CAREFULLY AND TO SEEK
COUNSEL REGARDING ANY QUESTIONS YOU MAY
HAVE RELATED TO THE LANGUAGE CONTAINED
HEREIN.
WITNESSETH: WHEREAS, Client desires to contract with
Consultant to furnish Services to Client’s project identified above.
WHEREAS, Consultant is engaged in the business of
providing services and related labor, materials, and equipment.
(herein individually and collectively referred to as Services.)
NOW, THEREFORE , in consideration of t he Mutual
Covenants and Promises included herein, Client and Consultant
agree as follows:
OFFER ACCEPTANCE: Client hereby accepts
Consultant’s offer to provide services as described in
Consultant’s proposal for services and agrees that such services
and a ny additional services authorized by client, shall be
governed by this Agreement.
CONTRACT DOCUMENTS: “Contract Documents” shall
mean this document as well as the attached proposal each of
which is incorporated into the other.
PAYMENT: Client will pay Con sultant for services and
expenses in accordance with the Contract Documents. The current
fee schedule in effect for the location providing the services shall
be used as the amount to be paid by client for services provided.
Consultant will submit progress invoices to Client monthly and a
final invoice upon completion of its Services. Each invoice, on
presentation, is due and payable by Client. Invoices are past due
30 days after the date of the invoice. Past due amounts are subject
to a late payment fee of one and one -half percent per month (18
percent per annum) or the highest amount allowed by applicable
law on the outstanding balance, whichever is less. Attorney’s fees
and other costs incurred by Consultant in collecting past due
amounts shall be paid by the Client.
Consultant shall be paid in full for all services rendered under
this agreement, including any additional services authorized by
Client in excess of those stated in this Agreement.
The Client’s obligation to pay under this Agreement is in no
way dependent upon the Client’s ability to obtain financing,
payment from third parties, approval of governmental or
regulatory agencies, or upon the Client’s successful completion of
the Project.
WARRANTY AND STANDARD OF CARE : Consultant
and its agents, em ployees and subcontractors shall endeavor to
perform Services for Client using that degree of care and skill
ordinarily exercised by and consistent with the standards of others
ordinarily providing similar services in the same or similar
locality as the on e where the services are performed. In the event
any portion of the Services fails to substantially comply with this
warranty and standard of care obligation and Consultant is
promptly notified in writing prior to ninety (90) days after
completion of such portion of the Services, Consultant will re -
perform such portion of the Services, or if re -performance is
impractical, Consultant will refund the amount of compensation
paid to Consultant for such portion of the Services.
THE REMEDIES SET FORTH HEREIN ARE
EXCLUSIVE.
This Warranty And Standard Of Care is in lieu of all other
warranties and standards of care. No other warranty or standard of
care, expressed or implied, including warranties of
merchantability and fitness for a particular purpose is made or
intended by the proposal, by oral communications or by any
representations made regarding the services included in this
Agreement.
LIMITATION OF LIABILITY - Consultant and Client
mutually agree that the services provided pursuant to this
Agreement involve risks or liability which cannot be adequately
compensated for by the payments Client will make under this
Agreement. Therefore, the total cumulative liability of
Consultant, its agents, employees and subcontractors whether in
contract, tort including negli gence (whether sole or concurrent)
and strict liability, or otherwise arising out of, connected with or
resulting from the services provided pursuant to this Agreement
shall not exceed the total fees paid by Client or fifty thousand
dollars, whichever is g reater and such shall constitute
liquidated damages . At additional cost, Client may obtain a
higher limit of liability prior to commencement of services. The
additional cost is compensation to Consultant for increasing the
Consultant’s limit of liability. The additional cost is not an
insurance cost. Consultant’s consideration to Client for this limit
of liability is specifically reflected in Consultant’s fees for
services under this Agreement as such fees are less than
Consultant would be paid for service s under an Agreement
without a limitation of liability. Client is cautioned that this is a
limited liability Agreement limiting the liability of
Consultant; therefore, Client is advised to carefully review
Client’s risk of liability related to this contrac t and address
such risks through Client’s insurance or other means.
DISCLAIMER OF CONSEQUENTIAL DAMAGES - In
no event shall Consultant or Client be liable to the other for
any special, indirect, incidental or consequential loss or
damages, including lost profits and loss of use.
REPORTS - In connection with the performance of the
Services, Consultant shall deliver to Client one or more reports or
other written documents reflecting Services provided and the
results of such Services. All reports and writte n documents
delivered to Client are instruments reflecting the services
provided by Consultant to Client pursuant to this agreement are
provided for the exclusive use of Client, Client’s agents, and
employees, all instruments of service, other written docu ments,
all original data gathered by Consultant and work papers
produced by Consultant in the performance of the Services are,
and shall remain, the sole and exclusive property of Consultant.
Should Client make instruments of service, including reports,
available to strangers or request that Consultant address or
forward copies of such to strangers, then Consultant’s obligation
with regard to such reports shall be to Client only, and limited to
the provisions of this Agreement. Client may request that
Consultant forward instruments of service to strangers or add
addressees (an addressee is a stranger which receives a report
prepared for Client but at Client’s request such report is addressed
to the stranger) to the instruments of service. Consultant reserve s
the right in its sole discretion to grant or deny Client’s request and
to charge additional fees for granting such a request. Such
strangers and addressees receiving instruments of service shall as
strangers to this Agreement have no recourse or basis fo r claim
against Consultant and in consideration for receiving such, agree
to look solely to Client as provider of the instruments of service.
Client shall indemnify and hold harmless Consultant, its agents,
employees and subcontractors from any stranger’s use or costs,
liabilities, claims and attorney’s fees arising from any stranger’s
36
Item 10.
Statement of Terms and Conditions
Page 2 of 3
ESP Terms & Conditions 2014 (version 4)
use or reliance on instruments of services when such use or
reliance is with Client’s knowledge.
SAFETY - With respect to the performance of the Services,
Consultant shall t ake safety precautions required by federal, state
and local laws, rules, regulations, statutes or ordinances. Should
Client, or third parties be conducting activities on the Site, then
each shall have responsibility for their own safety and compliance
with applicable safety requirements.
CONFIDENTIALITY – Subject to any obligation
Consultant may have under applicable law or regulation,
Consultant will endeavor to release information relating to the
Services only to its employees and subcontractors in the
performance of the Services, to Client’s authorize d representative
and to persons designated by the authorized representative to
receive such information.
SAMPLES - Unless otherwise requested, test specimens or
samples will be disposed of immediately upon completion of tests
and analysis. Upon written re quest, Consultant will retain
samples for a mutually acceptable storage charge and period of
time. In the event that samples contain or may contain hazardous
materials, Consultant shall, after completion of testing and at
Client’s expense, return such samp les to Client or make samples
available for disposal by Client’s agent. Client recognizes and
agrees that Consultant is acting as a bailee and at no time assumes
title to said samples.
INVENTIONS - Any and all inventions or discoveries
relating to the Se rvices, including improvements and
modifications to existing products or processes made or
conceived by Consultant or its employees during the term of this
Agreement are and shall remain the sole and exclusive property
of Consultant.
REPRESENTATIONS OF CLI ENT - Client warrants and
covenants that sufficient funds are available upon receipt of
Consultant’s invoice to make payment in full for the services
rendered by Consultant. Client warrants that all information
provided to Consultant regarding the project and project location
are complete and accurate to the best of Client’s knowledge.
Client agrees to furnish Consultant, its agents, employees, and
subcontractors a right -to-entry onto the project site and
permission to perform the services included in this Agreement.
PROJECT SITE - Reasonable precautions will be taken to
minimize damage to the Project Site from Consultant’s activities
and use of equipment. Client recognizes that the performance of
the services included in this Agreement may cause alteration or
damage to the site. Client accepts the fact that this is inherent in
the work and will not look to Consultant for reimbursement or
hold Consultant liable or responsible for any such alteration or
damage. Should Client not be owner of the property, then Client
agrees to notify the owner of the aforementioned possibility of
unavoidable alteration and damage and to indemnify and hold
Consultant harmless from any claims and costs including
attorney’s fees by the owner or persons having possession of the
site through the owner which are related to such alteration or
damage.
Client agrees to disclose the identity of all utilities serving
the Project Site and the presence and accurate location of
hidden or obscure man-made objects known to Client relative
to fie ld tests or boring locations. Client agrees to indemnify
and hold harmless Consultant from all claims, suits, losses,
personal injuries, death and property liability including costs
and attorney’s fees resulting from damage or injury to
subterranean struct ures (pipes, tanks, telephone cables, etc.)
arising from the performance of Consultant’s services when
the existence of such are not called to Consultant’s attention
in writing or the location not correctly identified in
information furnished Consultant.
TERMINATION FOR CONVENIENCE - Upon written
notice, Client or Consultant may terminate the performance of
any further services included in this Agreement if the terminating
party determines termination is in the terminating party’s interest.
Upon dispatch or receipt of the termination notice, Consultant
shall stop work on all services included in this Agreement and
deliver any instruments of service complete at that time to Client
and Client shall pay Consultant for all services performed up to
the dispatch o r receipt of the termination notice. Upon
termination for Convenience, Consultant and Client shall have no
further rights or remedies other than those included herein.
UNFORESEEN OCCURRENCES - If, during the
performance of service hereunder, any unforeseen hazardous
substance, material, element or constituent or other unforeseen
conditions or occurrences are encountered which, in Consultant’s
judgment significantly affects or may affect the services,
Consultant will notify Client thereof. Subsequent to that
notification, Consultant may; (a) If practicable, in Consultant’s
judgment and with approval of Client, complete the original
scope of services in accordance with the procedures originally
intended in the Proposal; (b) Agree with Client to modify the
scope of services and the estimate of charges to include the
previously unforeseen conditions or occurrences, such revision to
be in writing and signed by the parties and incorporated herein; or
(c) Terminate the services effective on the date of notification
pursuant to the terms of TERMINATION FOR CONVENIENCE.
DELAYS - Should completion of any portion of the Services
be delayed for causes beyond the reasonable control of or without
the fault or negligence of Consultant, the time for performance
shall be extended for a period equal to the delay.
INSURANCE - Consultant shall maintain at its own expense
the following insurance subject to normal industry exclusions: (1)
Workmen’s Compensation Insurance and Employer’s Liability
Insurance. (2) Comprehensive Automobi le Liability Insurance
with limits of $1,000,000.00 Certificates can be issued upon
request identifying details and limits of coverage.
INDEMNITY - Client agrees to indemnify, defend and save
harmless Consultant, its agents, employees and subcontractors
from and against any and all losses, liabilities, and costs and
expenses of every kind (including cost of defense, investigation,
settlement and reasonable attorney’s fees), which Consultant may
incur, become responsible for or pay out as a result of bodily
injuries (including death) to any person, damage to any property
or both, to the extent caused by Client’s negligence or willful
misconduct.
Client and Consultant shall, in the event of liability arising out
of their joint negligence or willful misconduct indemnify, defend,
and save harmless each other in proportion to their relative degree
of fault.
NON-SOLICITATION - Client does hereby agree not to
seek to influence any employee of Consultant to leave
Consultant’s employ and or become directly or indirect ly an
employee or representative for Client. Client further agrees that
breach of this condition will cause Consultant substantial and
irreparable damage and therefore, in the event of any such breach,
in addition to such other remedies which may be availa ble,
Consultant shall have the right to seek specific performance and
injunctive relief.
37
Item 10.
Statement of Terms and Conditions
Page 3 of 3
ESP Terms & Conditions 2014 (version 4)
CAPTIONS AND HEADINGS - The captions and headings
throughout this Agreement are for convenience and reference
only, and the words contained therein shall in no way be held or
deemed to define, limit, describe, modify, or add to the
interpretation, construction, or meaning of any provisions of or
scope or intent of this Agreement.
NO AMENDMENT/ WAIVER – This Contract may only be
amended by the written agreement of the Co nsultant and the
Client. No waiver by either party of any default by the other
party in the performance of any provision of this Agreement shall
operate as or be construed as a waiver of any future default,
whether like or different in character.
LAW TO APPLY - The validity, interpretation, and
performance of this Agreement shall be governed by and
construed in accordance with the laws of the state of North
Carolina., without giving effect to any choice or conflict of law
provision or rule (whether of the State of North Carolina or any
other jurisdiction) that would cause the application of the laws of
any jurisdiction other than the State of North Carolina. Should any
provision of this Agreement be deemed unenforceable by any
court of competent jurisdict ion, those provisions deemed
unenforceable shall be severed from the body of this Agreement,
so that the primary intent of this Agreement shall remain intact.
INTERPRETATION -- Since both the Consultant and Client
have reviewed this Contract, the normal rule of construction that
any ambiguities in this Contract are to be resolved against the
drafting party shall not apply.
CONSULTANT HEREBY ADVISES CLIENT THAT
ITS PERFORMANCE OF THIS AGREEMENT IS
EXPRESSLY CONDITIONED ON CLIENT’S ASSENT TO
THE TERMS AND CONDITIONS DETAILED HEREIN.
ENTIRE AGREEMENT - This Agreement represents the
entire understanding and agreement between the parties hereto
relating to the Services and supersedes any and all prior
negotiations, discussions and Agreements, whether written or
oral, between the parties regarding same. TO THE EXTENT that
any additional or different Provisions conflict with the Provisions
of this Agreement, the Provisions of this Agreement shall govern.
No amendment or modification to this Agreement or any waiver
of any provisions hereof shall be effecti ve unless in writing,
signed by both parties.
FORCE MAJEURE – In the event that either party is unable
to carry out its obligations under this Agreement, wholly or in
part, due to circumstance beyond its control, including without
limitation, fire; explosi ons; floods; acts of God; war or other
hostilities; civil commotion; governmental acts, orders or
regulations; then upon giving prompt notice of force majeure to
the other party, the party so affected shall be released without any
liabilities on its part from the performance of its obligations under
this Agreement, but only to the extent and only for the period that
its performance of said obligations is prevented by circumstance
of force majeure.
COMPLIANCE WITH LAW AND EEOC
COMPLIANCE - During performance hereunder, and every
activity connected herewith, the client/vendor shall comply fully
with all applicable laws, ordinances, rules and regulations, and if
requested and/or required, shall furnish evidence satisfactory to
ESP of such compliance. In additio n, client/vendor shall comply
with the then current provisions of the Equal Opportunity Clause
at 41 CFR 60 -1.4, 60 -250 and 60 -741.4, which are he reby
incorporated by reference.
If applicable to this purchase order, subcontract, or bill of
lading, the affi rmative action clause for disabled workers (41
CFR § 60 -741.4), the equal opportunity clause in Section 202 of
Executive Order 11246 (41 CFR § 60 -1 through 60 -50), and the
affirmative action clause for covered veterans (41 CFR 6 --300)
are hereby incorporat ed herein by reference. Further, if
applicable, seller agrees to file Standard Form 100 (EEO -1) and
the VETS-100A report. The contractor agrees to comply with 29
CFR Part 471, Appendix A to Subpart A.
This contractor and subcontractor shall abide by the
requirements of 41 CFR § 60 -1.4(a), 60 -300.5(a), and 60 -
741.5(a). These regulations prohibit discrimination against
qualified individuals based on their status as protected
veterans or individuals with disabilities, and prohibit
discrimination against all individuals based on their race,
color, religion, sex, or national origin. Moreover, these
regulations require that covered prime contractors and
subcontractors take affirmative action to employ and advance
in employment individuals without regard to rac e, color,
religion, sex, national origin, protected veteran status or
disability.
ATTORNEYS FEES – Should Consultant deem it
necessary to retain an attorney or other counsel to defend and/or
pursue the enforcement of this Agreement, Consultant shall be
entitled to recover reasonable attorneys’ fees and costs.
MATERIAL FACT WITNESS – Should parties i nvolved
with Client’s project become engaged in a claim in which ESP is
not named, and ESP is required/requested to provide testimony,
by deposition, or client request, regarding the contents of our
work, ESP shall be compensated for ESP’s time and materia ls
(copies, shipping fee, etc.) as an additional service to our contract
with Client. Our fees and expenses will be invoiced at our
prevailing hourly and unit rates. Any request for Expert Witness
services will be contracted under a separate agreement.
38
Item 10.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of Award to Mead & Hunt for Engineering Services for the SC 46 Widening Project
($1,053,734.19)
MEETING NAME AND DATE:
Public Facilities and Safety Committee – 03/27/2023
PRESENTER INFORMATION:
Jared Fralix, PE – Assistant County Administrator, Infrastructure Division
Eric Claussen, PE, PTOE – Director of Engineering, Alternate
(5 mins)
ITEM BACKGROUND:
Mead & Hunt is one of the award firms for Beaufort County’s On-Call Transportation Consultants
RFQ#051922E and asked to provide a scope and fee for engineering services related to improvements
on SC 46 from the roundabout at SC 170 to the Melanie Lowther Memorial Bridge. The improvements
include widening SC 46 from a two-lane section to a four-lane divided and/or five-lane section
including safety enhancements to the SC 170 & SC 46 roundabout.
PROJECT / ITEM NARRATIVE:
The project will consist of roadway improvements to approximately 2 miles of SC 46 from the
New River to SC 170. The proposed work will consist of widening SC 46 from two to four lanes.
It is assumed that the roadway section will be four lanes, with a raised median, designated bike
lane, and shared-use path with open drainage systems.
The scope of services will include all work associated with the development of construction plans.
It is anticipated that the NEPA process will be followed for this contract.
FISCAL IMPACT:
The contract fee is for time & materials in the amount of $957,940.19. Staff recommends a 10%
contingency of $95,794.00, bringing the project’s total cost to $1,053,734.19. The funding for this
project is Capital Funds approved in the 2022/41 Budget Amendment Ordinance – account 10401243-
54500 with a balance of $5,852,448.23.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award Mead & Hunt for Engineering Services for the SC 46 Widening
Project
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny the recommendation to award Mead & Hunt for Engineering Services for
the SC 46 Widening Project.
Next Step: Move forward to County Council to award Mead & Hunt for Engineering Services for the SC
46 Widening Project.
39
Item 11.
1
December 5, 2022
ERIC CLAUSSEN
DIRECTOR OF ENGINEERING
BEAUFORT COUNTY
2266 BOUNDARY STREET
BEAUFORT, SC 29902
RE: SC 46 WIDENING, BLUFFTON, SC
SCOPE AND FEE
Dear Mr. Claussen:
Mead & Hunt is pleased to submit this proposal to provide design services for the SC 46
Widening Project. As requested, we have submitted a detailed scope of services and a cost-plus
fixed fee proposal for your consideration. Mead & Hunt, in partnership with F&ME, McCormick
Taylor, Platinum Geomatics and Brockington and Associates, is proud to offer our services for
this project. The Mead & Hunt team will provide the County with reliable engineering services
of the highest integrity and value.
The project will consist of the development of 30% plans to widen SC 46 to four lanes as
detailed in the attached scope. The tasks associated with this project will be performed on a time
and expense contract not to exceed a price of $957,940.19
We appreciate this opportunity and look forward to continuing to build our relationship with you
and the Beaufort County team.
Sincerely,
Mead & Hunt, Inc.
Christopher Baker, PE
Project Manager
40
Item 11.
2
Beaufort County
Scope of Services
SC 46 Widening
SUMMARY OF WORK
The project will consist of roadway improvements to approximately 2 miles of SC 46 from the
New River to SC 170. The proposed work will consist of widening SC 46 from two to four lanes.
It is assumed that the roadway section will be four lanes, with a raised median, designated bike
lane, shared use path with open drainage systems.
The scope of services will include all work associated with the development of construction plans.
It is anticipated that the NEPA process will be followed for this contract.
Task 1: Project Management and Coordination $60, 850.00
Task 2: Public Involvement and Stakeholder Interaction $54,444.00
Task 3: Environmental Documentation/Process $66, 998.44
Task 4: Aerial & Field Surveys $148,696.00
Task 5: Roadway Design and Plan Preparation $259 ,972.00
Task 6: Traffic Analysis and Signal Warrant $20, 172.00
Task 7: Hydrology and Hydraulic Design and Plans $133,713.75
Task 8: Roadway Structures $39,629.00
Task 9: Utility Coordination $34,240.00
Task 10: Subsurface Utility Engineering $93,500. 00
Task 11: Geotechnical Engineering $25,475.00
Direct Costs: $20,250.00
TOTAL PROJECT COSTS $957,940.19
41
Item 11.
3
TASK 1: PROJECT MANAGEMENT AND COORDINATION
Project goals and objectives will be determined through coordination between Mead & Hunt, Inc.
(Consultant ), Beaufort County (County), Town of Bluffton (Town) and the South Carolina
Department of Transportation (SCDOT), assuming that this project will be executed in accordance
with the Intergovernmental Agreement (IGA) between the County and SCDOT .
Project Management and Coordination
The Consultant will manage the project to conform to the “SCDOT Standards for Highway
Construction in compliance with all Federal standar ds”. The process will include the
following duties:
• Coordinate with County’s and SCDOT’s Project Managers. Arrange and attend project
meetings, conferences, and on-site review meetings. Prepare and distribute meeting
minutes.
• Manage and monitor the project schedule as set fort h in the contract. Keep the county up
to date on the schedule and items that may affect the overall project schedule.
• Prepare monthly invoices for county review, approval, and payment. Review subconsultant
invoices and cost submittals included for payment in monthly invoices. Monitor payments
to subconsultants for services provided.
• Provide monthly status reports detailing the progre ss of the project to include milestones
reached and issues encountered that were satisfactorily resolved during the previous month.
• Provide overall management of all design efforts in cluding the management of
subconsultants and team members. Monitor subconsult ant activities for adherence to
overall project schedule and budget.
Assumptions:
1) Management time for the project is assumed to be 12 months
2) 4 project meetings in Beaufort
3) 3 meetings with the County and SCDOT
4) 2 miscellaneous meetings
Deliverables:
1) 12 Monthly status reports will be provided.
2) Meeting minutes for each meeting.
TASK 2: PUBLIC INVOLVEMENT & STAKEHOLDER INTERACTION
Community Relations Support – The Consultant will c oordinate with the County to identify the
stakeholders and determine at what stages throughou t the project development process to engage
the stakeholders and solicit feedback.
• Initial Stakeholder Meetings – If requested by the County, the Consultant will hold
meetings with community stakeholders.
42
Item 11.
4
• Public Information Meeting (PIM) – The Consultant w ill organize one (1) Public
Information Meeting. This PIM will be held near th e project location to facilitate
discussions and obtain public feedback. The PIM wi ll be held prior to finalizing the 30%
Roadway Plans.
• PIM Materials – The Consultant will develop a Proje ct Handout and a display layout
illustrating the proposed improvements, typical sections, limits of the project, etc.
• PIM Material Review Meeting - One (1) meeting will be held with the County and SCDOT
to review the materials that will be presented at the PIM.
Assumptions:
1) Responses will be provided to comments received from the PIM.
Deliverables:
1) Comment forms collected and reviewed after the PIM
2) Three (3) project layout drawings will be provided for the PIM.
One hundred fifty (150) project handou ts will be provided at the PIM.
TASK 3: ENVIRONMENTAL DOCUMENTATION/PROCESS
Jurisdictional Determination
• The Consultant shall perform a Jurisdictional Delineation utilizing the three-parameter
approach (hydric soils, hydrophilic vegetation, and wetland hydrology) set forth in the
1987 USACOE Wetland Delineation Manual and the applicable supplemental
specification.
• The Consultant shall provide an assessment and documentation of site conditions as to
the presence and/or absence of wetland areas to include identification and marking of
any upland/wetland boundaries with sequentially numbered flags. Additionally, using
submeter GPS or survey data, the Consultant will plot the wetland boundaries on a
surveyed map. The Consultant shall also provide electronic copies of any GIS CAD
files that are produced.
• Following the delineation of the upland/wetland boundaries, the Consultant shall
submit a request to the Charleston District U.S. Army Corps of Engineers (USACE)
for a Jurisdictional Determination, and copy (cc) the County.
Coordination with USACE
• Due to the complexity of this project, the Consultant shall schedule an onsite meeting
with the USACE to review the wetland boundaries, and discuss any particular
regulatory concerns related to the proposed project. The Consultant shall make a
determination of the aquatic significance of all wetlands, and confirm these findings
with USACE personnel.
43
Item 11.
5
• Section 7 Compliance - In accordance with regulatory requirements, the Consultant
will prepare and provide the USACE documentation (Biological Assessment) to
demonstrate compliance with Section 7 of the Endangered Species Act. The
Consultant shall utilize IPaC (Information for Planning and Consultation).
o No Critical Habitats are identified on IPaC as of October 2022.
o Surveys will need to be conducted for the following terrestrial species
which have the potential for habitat:
Northern Long-Eared Bat ( Myotis Septentrionalis ) (T)
Eastern Black Rail ( Laterallus Jamaicensis Ssp. Jamaicensis) (T)
Piping Plover ( Charadrius Melodus ) (T)
Red Knot ( Calidris Canutus Rufa ) (T)
Red-Cockaded Woodpecker ( Picoides Borealis ) (E)
American Wood Stork ( Mycteria Americana ) (T)
Frosted Flatwood Salamander ( Ambystoma Cingulatum) (T) >
Critical Habitat Identified West Of The New River
American Chaffseed ( Schwalbea Americana ) (E)
Canby’s Dropwort (Oxypolis Canbyi ) (E)
Pondberry (Lindera Melissifolia ) (E)
o Please note: The U.S. Fish and Wildlife Service (USFWS) plans to update
their listing of the Monarch Butterfly (Danaus Plexippus) and the tri-
colored bat (Perimyotis Subflavus) to a threatened and/or endangered
species, which would result in the need for surveys of these species as
well.
• Cultural Resources Survey -Brockington and Associates (Subconsultant) will
perform a cultural resources survey in compliance with Section 106 of the Historic
Preservation Act in anticipation of a Nationwide wetlands permit through the USACE.
The survey will include:
o A search of the subscriber’s version of the state’s online cultural resources
database
o Archival research of historic maps, plats, and aerial photographs of the
property.
o Archaeological survey following the SC Standards and Guidelines updated
in 2013
o Technical report summarizing the results of the survey and
recommendations for SHPO and USACE review.
o QA/QC of Permit Materials
NEPA Coordination
• The project is eligible for a non-programmatic categorical exclusion (NPCE) based on the
need for additional right-of-way and potential for cultural and wetland impacts.
• The project limits include the May River Scenic Byway designated by the State of South
Carolina Department of Transportation. This byway starts on SC 46 at the
44
Item 11.
6
Jasper/Beaufort County line and goes for 11 miles through historic Bluffton to Brighton
Beach located on the May River. The route is characterized by wetlands, oak canopies,
plantations, historic sites, and scenic vistas. Coordination with SCDOT during design will
be needed to ensure retention of the characteristics that make the area scenic. A portion of
this Byway has already been expanded from two to four lanes.
TASK 4: AERIAL & FIELD SURVEYS
Consultant will develop survey basemaps for use in plan development.
• Aerial Mapping – Consultant will obtain new color aerial imagery and LiDAR data to
support one-foot DTM collection and 1”=50’ scale pl animetric features. The corridor is
assumed to be for 300’ (150’ each side of centerline) along SC 46. Aerial LiDAR data will
be collected simultaneously at a nominal point spac ing which exceeds the usual ppm for
transportation projects. The resulting Digital Terr ain Model (DTM) will be enhanced by
collecting breaks in the terrain to enhance the sur face. All mapping and control shall be
done in accordance with the most recent version of SCDOT’s Survey Manual.
o The ground control will consist of aerial panels/ph oto-identifiable features on
paved surfaces at >1,500’ intervals. Vertical check shots will be observed at
intervals between each pair of the aerial panels/ph oto-identifiable features to
serve as check.
• Field Surveys – Consultant will provide additional onsite field surveys to supplement the
aerial mapping. The onsite field surveys will:
o Verify stormwater features
o Include existing right-of-way and property frontages
o Supplement obscured areas
o Set control points
• Courthouse Research : Consultant will conduct courthouse research to o btain deeds and/or
plats of record from the County Register of Deeds i n order to plot the property. Consultant
will obtain SCDOT record plans for the most current dockets and other R/W information to
assist in the establishment of the right of way and plot existing properties.
TASK 5: ROADWAY DESIGN AND PLAN DEVELOPMENT
Preliminary Roadway Plans
Prior to beginning plan development the consultant will analyze alternative alignments for
consideration by the County/SCDOT. The alternatives will consider impacts such as utilities,
property owners, constructability, wetland impacts etc. Preliminary cross sections, profiles and
limits of construction will be developed to analyze the impacts.
To preliminary plans submittal will consist of:
• Roadway geometric alignment and profile in sufficie nt detail and in the appropriate format,
to clearly illustrate significant design features of the project.
45
Item 11.
7
• Preliminary roadway plans per SCDOT Roadway Design Manual guidelines. Development
of preliminary plans will begin immediately upon re ceipt of survey data. Sections of the
preliminary plans shall be completed as soon as the requisite decisions of the conceptual
roadway development process have been made and the typical sections have been established
then approved by the County.
• Documented QC/QA materials
• Preliminary Cost Estimate
Preliminary plans layout will be developed and serve as the base documents for further refinement
into the final R/W plans and construction documents.
Representatives from the Town, County, SCDOT and the Consultant, involved in roadway, traffic,
and hydrologic design, will perform one (1) Design Field Review (DFR) meeting during the
preliminary plan development. All information gathe red during field investigations will be
evaluated and the plans revised accordingly.
• The preliminary plans shall contain sufficient deta ils of pertinent physical features to
illustrate the design which will include:
1. Detail plan layout, including all geometric data
2. If necessary, section on structure type, size, and centerline location
3. Horizontal and vertical alignments
4. Typical sections
5. Limits of existing R/W and adjacent properties
6. Type, size, and location of major above ground utility facilities
7. Preliminary cross-sections per SCDOT standards
8. Limits and configuration of proposed R/W
9. Preliminary cost estimate
Assumptions :
1) The project will be reviewed by SCDOT’s Design Support group.
2) The Consultant will submit the roadway design criteria for approval to the SCDOT
prior to Preliminary Plan submittal.
3) SCDOT to provide one round of written comments within four (4) weeks after initial
submittal.
4) One Design Field Review (DFR) will be scheduled at the completion of 30% plans.
5) The typical section(s) will be submitted for approv al to the SCDOT prior to
Preliminary Plan submittal.
Deliverables:
1) Preliminary Roadway Plans
2) One (1) electronic copy of all Microstation files upon request
3) Preliminary Construction Cost Estimate
46
Item 11.
8
TASK 6: TRAFFIC ANALYSIS AND SIGNAL WARRANT
This task will involve the collection of traffic co unts and analysis for the intersection of SC 46
with the two intersections of Heritage Parkway.
COORDINATION
• Email and telephone conversations with the County r egarding known traffic operational
issues, history of problems, etc.
• One in person meeting to discuss results
• Coordination with subconsultant
DATA COLLECTION
• Turning Movement Counts
o Two (2) - 12 - Hour Turning Movement Count for a typical weekday when school is
in session
o One (1) - 3 day – 24-hour directional counts
• Evaluate Sight Distances
o Evaluate sight distance to confirm they exceed AASHTO minimum requirements.
• Peak Period Traffic Data Collection and Observations. The work during each peak period
will include general traffic observations of queues , delays, driver behaviors; field
measuring delays on the STOP controlled side street and the main roadway left turns; and
field measuring queues (average, minimum, maximum). We will photograph commonly
observed unusual or erratic behaviors by vehicles o r pedestrians that may be contributing
to operation deficiencies. Photograph long queues or blocking issues. Review intersection
for tell-tale signs of possible un-reported crashes.
o One peak period (highest volumes of Weekday AM or PM peak period)
HISTORICAL CRASH DATA ANALYSIS
• Review the crash data provided by Beaufort County f or the prior five (5) year period. We
assume the crash data will be provided by the Count y (or SCDPS/SCDMV) at no cost to
consultant.
• Identify and review trends by time of day, day of w eek, season, lighting, pavement
conditions, approach, crash type, etc.
• Correlate crash patterns with geometric, traffic co ntrol and traffic operations to identify
potential causes of the crash patterns, if any.
SIGNAL WARRANT ANALYSIS
• MUTCD Signal Warrant Analysis
o This analysis assumes the existing geometric config uration, as well as proposed
safety countermeasure improvements.
o Prepare an MUTCD signal warrant analysis using HCS software under weekday
traffic volumes.
47
Item 11.
9
• Safety Countermeasures
o Identify mitigation measures for safety improvement s including alternative
intersections, signing/marking improvements, geometric improvements
o Analyze impact of countermeasure using HCM methodology
o Provide high level schematic improvement plan
TECHNICAL MEMO
• Prepare a brief (2-3 pages) technical memo. The memo will outline:
o Existing Conditions and Intersection Characteristics
o Crash Data Analysis
o Signal Warrant Analysis
o Conclusion
• Receive and respond to comments from County/SCDOT on the technical report.
TASK 7: HYDROLOGY AND HYDRAULIC DESIGN AND PLANS
All designs and documents will follow the following design criteria:
• SCDOT’s Requirements for Hydraulic Design Studies, latest edition;
• SCDOT Standard Drawings, latest edition;
• The Environmental Protection Agency’s (EPA) National Pollution Discharge
Elimination System (NPDES) as administered under general permit by the SC
Department of Health and Environmental Control (DHEC);
• FEMA Regulations, 44CFR Chapter 1;
• State Stormwater and Sediment and Erosion Control Regulations administered
by DHEC, 26 S.C. Code Ann. Regs. 72-405 (Supp. 1995) et seq.; South
Carolina State Water Law;
• AASHTO “Highway Drainage Guidelines” dated 2007;
• “SoLoCo Stormwater Design Manual”;
• SCDOT Supplemental Technical Specifications.
FLOODPLAINS
Based on the results of a hydraulic design study performed according to SCDOT
Guidelines for Hydraulic Design Studies the following statements should be
included in the environmental document where applicable: Regarding FEMA
designated floodways, McCormick Taylor shall include either a ‘no effect’
statement or a ‘conditional letter of map revision;’ otherwise McCormick Taylor
will include a statement that “based on the hydraulic analysis of the pre-construction
and post-construction discharges, the planned roadway improvements will have no
significant impact on either flood elevations or flood widths.” A floodplain checklist will
be completed and included as an Appendix to the environmental document. In the event a
48
Item 11.
10
no rise certification or no significant impact can be achieved a supplement may be
required to provide the necessary efforts associated with a CLOMR/LOMR.
ROADWAY DRAINAGE
McCormick Taylor will perform all aspects of the preliminary roadway drainage
and drainage design and will follow all guidelines for roadway surface drainage
and sediment and erosion control. The impacts to the existing hydrology due to
the proposed project will be evaluated. Based on this evaluation, design
alternatives to control flooding and manage the runoff associated with the project
will be examined. Designs will be performed for ditches, storm sewer facilities,
cross line culverts and energy dissipaters as necessary. McCormick Taylor will
provide the roadway hydrologic services listed below:
• Establish design criteria.
• Perform field investigation(s) to:
o Inventory the location and condition of the existing storm drainage appurtenances.
o Determine the boundaries of tributary watersheds draining through the area.
o Identify and evaluate the usability of drainage outfall ditches.
o Determine preliminary location of inlets, catch basins and sediment damn/basins.
• Data Collection
o Land use data for existing and proposed developments.
o Determine if there is any involvement in floodways or flood hazard areas.
o Identify flooding problems associated with the project based on historical information.
o Identify receiving stream(s) for the project and cr oss check with SC DHEC’s most
current 303(d) list and table for water bodies with approved TMDL’s.
o Obtain plans of existing roads that will impact the project.
• Preliminary Roadway Plans Engineering Services for Hydraulic/Hydrologic Design
o Prepare the appropriate drainage basin map using ex isting topographic maps,
information gathered from the field investigation(s ) and available information from
federal, state and local agencies.
o Perform a hydrologic study of the watershed(s) affected by the roadway and pedestrian
improvements.
o Verify the adequacy of the existing storm drainage facilities for any additional flows
caused by the proposed improvements.
o Development of preliminary storm drainage plan and type, size, invert elevation and
location of major storm drainage features including outfall ditches, sediment basins and
roadway ditches;
o Prepare CAD drawings of preliminary drainage system layout and provide to Mead and
Hunt to incorporate into their plans. Provide drainage related details. Profiles and cross
sections will not be completed at this stage.
o Prepare a report summarizing the findings of the hydrologic analysis and computations,
including cost estimates for upgrading any undersiz ed storm water appurtenances
affected by the proposed improvements.
o Attend DFR and one field meeting with Prime, Beaufort County and other stakeholders.
49
Item 11.
11
FEMA FLOODPLAIN ANALYSIS
• A portion of the project is located in FEMA Zone A (no elevation provided) and just
upstream of a FEMA Zone AE with an elevation of 5 feet, indicating that the area is
determined to be inside the 1.0% annual chance flood. The flood plain is shown adjacent
to both sides of the roadway, with a portion of the roadway being shown as overtopped
during the 1.0% annual chance flood, near the intersection of SC 46 and Heritage
Parkway. The proposed roadway widening will be constructed in fill which may create
an impact to the FEMA regulated water surface elevation, an analysis will be required to
ascertain a no rise certification. As this route is an Emergency Evacuation Rout, the
proposed road will need to be outside the 1.0% annual chance floodplain. FEMA Flood
Insurance Rate Maps for Beaufort County shows the flooding source, as New River
Creek. McCormick Taylor will coordinate with Mead and Hunt on the proposed grading
and potential impacts to the FEMA flood plain.
• McCormick Taylor will obtain the FEMA Effective Model and create a second model
incorporating the obtained survey data. A model for existing conditions will be prepared
to compare against the proposed roadway alignment. A preliminary final conditions
model will be prepared based on the chosen alternative and preliminary roadway design.
McCormick Taylor will follow requirements in the SCDOT Hydraulic Design Studies as
well as coordinate with the County’s Floodplain Administrator. It is anticipated that a no
impact to the 100-year water surface elevation can be achieved with this project. A no
rise certification will be prepared in the subsequent phases as final design commences to
accompany the proposed roadway and submitted to the County’s Floodplain
Administrator. It will not be prepared under this scope of services.
• McCormick Taylor will provide Quality Control and Quality Assurance of the FEMA
study for completeness, correctness, accuracy, and consistency with the above referenced
standards.
POST CONSTRUCTION STORMWATER MANAGEMENT
• The post construction stormwater management will follow the 2020 Southern
Lowcountry Stormwater Design Manual (SoLoCo). The SoLoCo design manual
indicates that the project location is within the Bacteria and Shellfish Watershed
Protection Area. The Bacteria and Shellfish Watershed Protection Areas are either
impaired or have TMDLs, or the receiving waters are classified for shellfish harvesting.
These watersheds require greater protection due to their Clean Water Act status or water
quality classification. McCormick Taylor will collaborate with Mead and Hunt to
identify suitable locations for the post construction stormwater bmp locations.
McCormick Taylor will provide locations of geotechinical borings and infiltration tests to
Mead and Hunt. McCormick Taylor will coordinate with Mead and Hunt to ensure
proposed stormwater BMP locations are captured in the topographic survey. The project
shall meet the following performance requirements:
o Water Quality: Implementation of Better Site Design and retain 95th percentile
storm on-site with approved infiltration/filtering BMPs. Fulfill MEP requirements
or as a last resort, fulfill off-site credit and/or fee in lieu requirements
50
Item 11.
12
o As a pollutant removal minimum, intercept and treat stormwater runoff volume to
at least an 80 percent reduction in total suspended solids load, 30 percent reduction
of total nitrogen load and 60 percent reduction in bacteria load.
o Peak Control: Control the post development peak runoff discharge rate for the 2, 10,
and 25-year 24 design storm events to the pre-development discharge rates.
o Accommodate the 100-year, 24-hour storm event conve yance through the site and
downstream without causing damage/inundation of str uctures. Provide 10% rule
analysis
o Complete a natural resources inventory for new site development applications. This
is a requirement of the permit application.
• McCormick Taylor will prepare a Stormwater Management Concept Plan and Report
based upon Mead and Hunt’s Preliminary Roadway Plans. This plan will include low
impact style post construction stormwater BMPs. The concept plan will include:
o Pre and Post Hydrology and Hydraulics
o Siting and preliminary sizing of post construction stormwater BMPs
o Typical details
o Engineer’s opinion of probable costs
• McCormick Taylor will provide Quality Control and Quality Assurance of the Stormwater
Management Concept Plan and Report
PROJECT MEETINGS
• McCormick Taylor will conduct a preliminary site visit and attend a project kickoff
meeting to gain greater familiarity of the project location and identify potential project
challenges.
• McCormick Taylor will attend monthly project meetings with the design team. It is
anticipated that there will be 12 meetings over the course of the project.
• Representatives from McCormick Taylor will attend one (1) design field review meetings
following each of the milestone submissions for a total of three review meetings. All
information gathered during these field investigations will be evaluated and plans revised
accordingly. McCormick Taylor will provide a summary of each field review.
Deliverables:
1. Preliminary set of electronic drainage, stormwater, and associated plan sheets.
2. Preliminary Drainage and Stormwater Management Design Study/Report.
3. Preliminary FEMA HECRAS Model and summary, data and models.
4. Electronic PDF file of correspondence to the local municipal floodplain coordinator(s).
5. Preliminary Quantities and cost estimate information for drainage, and stormwater
management.
Assumptions:
1. All services described herein will be conducted with reference to SCDOT requirements
and guidelines, such as “Requirements for Hydraulic Design Studies,” the “Plan
Preparation Guide,” and the SCDOT Standard Drawings.
2. The project falls within a TMDL for Dissolved Oxygen, Fecal Coliform Impairments.
51
Item 11.
13
3. The project falls within the 303d list for Fecal.
4. Project must comply with 2020 Southern Lowcountry Stormwater Design Manual
Task 7 Exclusions:
1. Semi-Final, Final, and Advertisement level design services
2. Erosion and Sediment Control Plans
3. Geotechnical exploration, analysis, and design including slope stability computations.
Mead and Hunt will be required to provide geotechnical borings and infiltration tests
at proposed post construction stormwater bmp locations. McCormick Taylor will
provide these locations to Mead and Hunt. This will be performed under a separate
contract.
4. Utility test pits to determine vertical location of underground utilities are to be provided
to MT from Mead and Hunt. These will be performed under a separate contract.
5. Design of drainage system components that would be categorized by SCDOT as a
“small structure” or bridge. This includes box culverts.
6. H&H Analysis and FEMA modeling or coordination with the New River Bridge crossing
7. FEMA CLOMR/LOMR
8. Attendance at public meetings or stakeholder meetings, other than meetings with the
Client or design team.
9. Advertisement phase and Construction Phase services and support
10. As-Built review and certifications
11. Development of mitigation design plans onsite or offsite to establish mitigation areas.
12. SCDOT Encroachment Permits
TASK 8: ROADWAY STRUCTURES
This task will consist of the design and plan devel opment for the replacement of the bridge over
the New River Trail with a box culvert. The Consult ant will conform to the applicable design
manuals, standards, and guidelines in preparation o f roadway structure designs for SCDOT
roadways.
Box Culvert Design and Plans
Design Basis Statement – The Consultant will perfor m preliminary design activities and a basic
alternative analysis necessary for one single barre l precast concrete box culvert (<20 feet total
span) with an estimated length of 120 LF.
The Consultant will conform to the following SCDOT and FHWA design standards in preparation
of the box culvert plans:
• SCDOT Road Standard Drawings and Details, latest versions
• SCDOT Bridge Drawings and Details, latest versions
• SCDOT Geotechnical Design Manual, 2019, Version 2.0 , with latest Geotechnical
Design Bulletins
• SCDOT Bridge Design Manual, 2006 edition
52
Item 11.
14
• SCDOT Bridge Design Memorandums (to RPG Structural Engineers and Design
Consultants, issued after April, 2006)
• SCDOT Standard Specifications for Highway Construction, 2007 edition
• Standard Special Provisions and Supplemental Specifications used by SCDOT
• AASHTO LRFD Bridge Design Specifications, 2017 8th Edition
Box Culvert Preliminary Plans
The Consultant will develop preliminary roadway str ucture plans to replace the existing bridge
structures within the project limits. Preliminary p lans shall be prepared in conformance with the
current practice of the SCDOT. The plans will also incorporate pedestrian lighting needs through
the box culvert.
Preliminary Box Culvert Quantities and Cost Estimates
The Consultant will develop quantities and associated construction material costs for preliminary
plans.
Plans QA/QC
Prior to submittal to the County/SCDOT, all plan sh eets and documents shall be thoroughly
reviewed by the Consultant for completeness, correc tness, accuracy, and consistency with the
above referenced requirements and in accordance wit h internal QA/QC procedures. Roadway
structure plans will be included in road plan submittals and will be reviewed by SCDOT Structural
Design Support group and other groups as necessary for Quality Assurance review in conjunction
with the road plans. The Consultant shall respond to all comments and provide verification plan
sets as necessary to close out all comments.
Deliverables:
1) One (1) electronic pdf copy of special provisions in Word format
Assumptions:
1) It is assumed that one (1) single-barrel precast co ncrete box culvert (<20 feet total span)
will be necessary for this project, at 120 LF
2) It is assumed the culvert will be precast concrete and the structural design of the precast
boxes will be performed by the precast supplier.
TASK 9: UTILITY COORDINATION
General Responsibilities and Duties:
53
Item 11.
15
• The Consultant shall have the responsibility of coordinating the Project development with
all utilities that may be affected. All utility relocations shall be handled in accordance
with the SCDOT’s “A Policy for Accommodating Utilities on Highway Rights of Way”
and the Code of Federal Regulations, Title 23, Chapter 1, Subchapter G, part 645,
subparts A & B.
• These services shall be performed by individuals skilled and experienced in utility
coordination services.
• The Consultant shall work with designers of the Project to avoid conflicts with utilities
where possible and minimize impacts where conflicts cannot be avoided. This may
include, but is not limited to, utilizing all available utility data, whether obtained from
SUE services, as-built plans, or provided by the County or some other source. The
Consultant will be expected to determine all utility conflict points, including all work to
properly analyze each conflict point, and make recommendations for resolution of the
conflict where possible.
• The utility company shall not begin their relocation work until authorized in writing by
the County.
Early Utility Coordination
• Project Preliminary Review: The Consultant shall coordinate with the County to collect
and review available project plans and the proposed scope of construction.
• Utility Introduction Letter: The Consultant shall develop a Utility Introduction Letter for
each utility company. This letter shall be populated by the Consultant with the utility
company’s information (to include the company’s email address) and electronically sent
to the County for signature. The Consultant will then distribute the letters via e-mail to
the utilities.
• Utility Record Collection and Review: The Consultant shall initiate early coordination
with all utility companies that are located within the Project limits. Coordination shall
include, but shall not be limited to, contacting each utility company to advise the
company of the proposed Project, obtaining copies of as-built plans for the existing utility
facilities (if available), perform a review of utility as-built plans and determine the utility
company’s requirements for the relocation of their facilities.
• Site Visit: The Consultant shall perform a site visit for a visual inventory of existing
utilities within the proposed project limits.
• Coordination Meeting with Utility Companies: The Consultant shall coordinate and
conduct a preliminary review meeting with the utility companies (if deemed necessary)
for the completion of Early Utility Coordination.
• Early Utility Coordination Email: The Consultant shall prepare and send the Early
Utility Coordination Email to the County. Email to be used as an informal summary of
the Early Utility Coordination tasks.
Deliverables: The Consultant shall prepare and submit to the County an Early Utility
Coordination Email which includes:
1) List of all utility companies and contact information within the project limits
2) Utility Introduction Letter
3) Early assessment of each Utility Company’s facilities located within project limits
54
Item 11.
16
4) Site Visit documentation (notes, photographs, drawings, etc.).
5) Utility Companies Coordination Meeting Notes
6) Utility Records
TASK 10: SUBSURFACE UTILITY ENGINEERING
Consultant will provide a Quality Level B (QL-B) SU E investigation for this corridor. This task
will begin with thorough research of the records for all utilities, public and private, located within
the project limits. Once the records research has b een completed, field staff will designate and
mark all observable utilities found within the corridor marking each utility with a designated color
to discern the utilities present and their location . Once the utilities have been designated,
Consultant will survey each utility and collect all utility poles to include overhead connectivity. A
thorough QAQC of all designated and located utiliti es will be performed to ensure all data has
been thoroughly investigated, designated, and locat ed in accordance with SCDOT’s SUE
specifications. The final deliverables for this work will be provided in a composite drawing.
Itemized SUE tasks:
• Records Research
• Recover Survey Control
• Designate & Mark Existing Utilities
• Survey Designated Markings/Above Ground Utility Surface Features
• Survey Utility Poles and Record Overhead Connectivity
• Develop Utility Composite Drawing (UTLE.dgn)
• Final QA/QC
TASK 11: GEOTECHNICAL ENGINEERING
• FME will contact the SC811 prior to our field exploration services. Beaufort County is
responsible for locating and marking any utilities that are not located by SC811. FME is
not responsible for damage to unmarked or incorrectly marked utility lines.
• FME will provided traffic control for safe access to the test locations. FME anticipates
that SCDOT style traffic control will be needed with a flagger.
• FME will file an encroachment permit application with SCDOT unless FME is instructed
that one is not needed per the County’s agreement with the SCDOT.
• FME proposes to advance five (5) Standard Penetration Test (SPT) borings. Four (4) SPT
borings will be performed for the roadway widening, and one (1) SPT boring will be
performed for the box culvert placement. Borings for this exploration will be extended to
depths ranging from five (5) to fifty (50) feet below the ground surface depending on
boring location. FME estimates the total drilling depth to be one hundred (100) feet.
Sampling will be conducted continuously in the top ten (10) feet, then in five (5) feet
intervals thereafter.
• FME proposes to preform one (1) or more Multi-Channel Analysis of Surface Waves
(MASW) arrays at the box culvert to approximate shear wave velocities. In the upper 100
55
Item 11.
17
feet.
• Borings will occur from the roadway with an on-road drill rig. Clearing will not be
needed
• FME will obtain two (2) bulk soil samples for analysis and FME may attempt up to two
(2) Shelby Tube samples if soft clays are encountered.
• FME will collect the asphalt pavement cores from the borings performed in the roadway
• FME will submit the Consultant Seismic Request Form to the SCDOT for an ADRS
curve
• Groundwater level will be measured at the time of boring and then backfilled with auger
cuttings, and the asphalt pavement cores will be patched with cold patch asphalt
pavement.
• Recovered hand auger samples will be classified in the field per the Unified Soil
Classification System (USCS) by the Visual-Manual Soil Classification method. Samples
will be placed in plastic bags and sealed after classification. Samples will be transported
to FME’s laboratory where a select number of samples will be tested. The laboratory test
program will include sic (6) grain size distributions, Atterberg limits, and moisture
content determinations. The results of the laboratory test program will aid in the
approximation of soil properties and will supplement classifications made by the Visual-
Manual method. Each bulk soil sample will be tested by Standard Proctor. One (1) bulk
soil sample will be tested for 3-Point CBR. FME will also perform one (1) shear test
either on a bulk sample or Shelby Tube sample. FME may also perform a consolidation
testing on a Shelby Tube sample.
• FME will provide a conceptual geotechnical report. This report is not intended to be used
as a preliminary geotechnical report or to meet the SCDOT GDM requirements for
preliminary roadway or preliminary bridge report. The conceptual report will include a
summary of our exploration, boring logs, laboratory data, ground water measurements,
SCDOT ADRS curve, and boring location plan in SCDOT format. The report will also
include commentary on the following:
Liquefaction potential and possible mitigation that may be needed at the
new culvert;
Available pavement Structural Number;
Reuse of onsite soils as embankment fill;
Anticipated ground water elevation and possible mitigation techniques; and
Foundation concept for culvert;
Ground improvements for culvert approaches; and
Embankment stability for sliver fills under static loading.
56
Item 11.
Principal PROJECT
MANAGER
SENIOR
ROADWAY
ENGINEER
ROADWAY
ENGINEER
SENIOR
TRAFFIC
ENGINEER
TRAFFIC
ENGINEER
SENIOR STRUCTURAL
ENGINEER
STRUCTURAL
ENGINEER
SENIOR ENV.
SCIENTIST
ENV.
SCIENTIST
SR. UTILITY
PROJECT
MANAGER
SR. UTILITY
COORDINATOR
UTILITY
COORDINATOR
JR. UTILITY
COORDINATOR
REGISTERED
LAND SURVEYOR
SURVEY CREW
CHIEF
SURVEY
INSTRUMENT
MAN
ENGINEERING
TECHNICIAN
PUBLIC
INVOLVEMENT
SPECIALIST
ADMIN.
ASSIST.
TOTAL
HOURS TASK TOTAL
Task 1: Project Management and Coordination 80 180 50 40 350 $60,850.00
30 30 26 50 60 116 30 342 $54,444.00
160 184 344 $45,208.00
$21,790.44
262 864 1126 $121,196.00
$27,500.00
16 360 760 540 1676 $259,972.00
12 48 48 108 $17,172.00
Task 6: Traffic Analysis and Signal Warrant (Subconsultant) $3,000.00
$133,713.75
16 80 8 24 60 65 253 $39,629.00
20 80 140 240 $34,240.00
$93,500.00
$25,475.00
MAN HOUR TOTAL: 110 226 386 810 12 48 16 80 160 184 28 24 140 140 262 0 864 713 166 70 4329
HOURLYRATE $210.00 $177.00 $177.00 $160.00 $191.00 $177.00 $191.00 $167.00 $148.00 $117.00 $210.00 $167.00 $148.00 $130.00 $146.00 $130.00 $96.00 $133.00 $167.00 $96.00
BUDGETED COST $23,100.00 $40,002.00 $68,322.00 $129,600.00 $2,292.00 $8,496.00 $3,056.00 $13,360.00 $23,680.00 $21,528.00 $5,880.00 $4,008.00 $20,720.00 $18,200.00 $38,252.00 $0.00 $82,944.00 $94,829.00 $27,722.00 $6,720.00
LABOR TOTAL: $937,690.19
Mileage 10000 Miles $0.585 / Mile $5,850.00
Prints (8.5x11) Pages $0.25 / Pages $0.00
Prints (22x36) Rolls $50.00 / Roll $0.00
Postage Lump Sum $15.00 Each $0.00
Permitting Lump Sum $1,000.00 Each $0.00
Per-Diem 80 Lump Sum $30.00 Per Day Based on two man crew $2,400.00
Lodging 60 Per Night $200.00 Per Night $12,000.00
DIRECT TOTAL COST (ROUNDED): $20,250.00
TOTAL PROJECT FEE: $957,940.19
December 5, 2022
Task 9: Utility Coordination
Task 10: Subsurface Utility Engineering (Subconsultant)
Task 8: Roadway Structures
Task 11: Geotechnical Engineering (Subconsultant)
SEE SUBCONSULTANT PROPOSAL
SEE SUBCONSULTANT PROPOSAL
SEE SUBCONSULTANT PROPOSAL
SEE SUBCONSULTANT PROPOSAL
SEE SUBCONSULTANT PROPOSAL
Task 5: Roadway Design & Plan Development
Task 6: Traffic Analysis and Signal Warrant
Task 7: Hydrology and Hydraulic Design and Plans (Subconsultant)
Task 4: Aerial & Field Surveys (Subconsultant)
BEAUFORT COUNTY - SC 46 WIDENING
BEAUFORT, SOUTH CAROLINA
TASK
Task 4: Aerial & Field Surveys
Task 3 - Environmental Documentation/Process
Task 2: Public Involvement & Stakeholder Interaction
FEE BREAKDOWN
Task 3 - Environmental Documentation/Process (Subconsultant) SEE SUBCONSULTANT PROPOSAL
57