Agenda
Colleton County · Colleton County · meeting of May 3, 2022 · Agendas
Open the original document More from Colleton County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
AGENDA
COLLETON COUNTY COUNCIL
REGULAR MEETING
TUESDAY, MAY 3, 2022
6:00 P.M.
COUNTY COUNCIL CHAMBERS, OLD JAIL BUILDING
1. Call to Order
2. Roll Call
3. Invocation & Pledge of Allegiance
4. Approval of Minutes
a) Regular Meeting April 12, 2022
5. Awards and Recognitions
6. Appearances & Public Presentations
a) Coastal Empire Community Health Center
7. Administrator’s Briefing
8. Public Hearing
a) Ordinance 22-O-02, Authorizing the Execu tion of a Temporary Lease Agreement
Between Colleton County and Causie Contra cting, Inc. for the Staging of Personnel
and Equipment related to the I-95 Construc tion and Repaving fr om St. George to
Point South.
b) Ordinance 22-O-03, To Amend Title 9 – P ublic Peace and Welfare, Chapter 9.02 –
Public Nuisance Generally and Chapter 9.04 – Littering, To Coincide With The Ten
Year Update Of The Colleton County Comprehensive Plan
c) Ordinance 22-O-04, To Amend Title 13 – Buildings and Construction, Chapter 13.04
– Construction Codes Adopted, Chapter 13.12 – Flood Damage Prevention, Chapter
13.16 – Manufactured Homes and Chapter 13.20 – Uniform Ordinance Summons, To
Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan
d) Ordinance 22-O-05, To Amend Title 14 – Land Management, Chapter 14.04 – Land
Development Regulations And Chapter 14.08 – Zoning, To Coincide With The Ten
Year Update Of The Colleton County Comprehensive Plan
9. Old Business
a) 3
rd Reading Ordinance 22-O-02, Authorizi ng the Execution of a Temporary Lease
Agreement Between Colleton County and Causie Contracting, Inc. for the Staging of
Personnel and Equipment related to the I- 95 Construction and Repaving from St.
George to Point South.
b) 3rd Reading Ordinance 22-O-03, To Amend T itle 9 – Public Peace and Welfare,
Chapter 9.02 – Public Nuisance Generally and Chapter 9.04 – Littering, To Coincide
With The Ten Year Update Of The Colleton County Comprehensive Plan
c) 3
rd Reading Ordinance 22-O-04, To Amend T itle 13 – Buildings and Construction,
Chapter 13.04 – Construction Codes Adopted, Chapter 13.12 – Flood Damage
Prevention, Chapter 13.16 – Manufactured Homes and Chapter 13.20 – Uniform
Ordinance Summons, To Coincide With The Ten Year Update Of The Colleton
County Comprehensive Plan
d) 3
rd Reading Ordinance 22-O-05, To Amend Title 14 – Land Management, Chapter
14.04 – Land Development Regulations A nd Chapter 14.08 – Zoning, To Coincide
With The Ten Year Update Of The Colleton County Comprehensive Plan
e) 2
nd Reading Ordinance 22-O- 06, To Provide for the Le vy of Taxes in Colleton
County, South Carolina, for the Fiscal Year July 1, 2022 through June 30, 2023 to
Provide for All Other Appropriations Ther eof; and to Provide for Other Matters
Related Thereto
10. New Business
a) 1
st Reading Ordinance 22-O-08, By Title On ly, To Impose, Subject to Referendum
Approval and Pursuant to the Capital Proj ect Sales Tax Act, a One Percent (1%)
Sales and Use Tax (The "Tax") Within Colleton County for Not More Than Seven (7)
Years; To Order a County-Wide Referendum On The Question of Imposing the Tax
and to Prescribe the Contents of the Ballo t Question; To Specify the Purposes For
Which the Proceeds From the Tax Are To Be Used, the Maximum Time For The
Imposition Of The Tax; and To Provide For Other Matters Relating Thereto.
b) 1st Reading Ordinance 22-O-09, To Authoriz e the Rezoning a 4.3 Acre Parcel at
Bennett’s Point, Identifie d as T.M.S. No. 334-00- 00-74, from Community
Commercial (CC) to Rural Conservation-2 (RC-2).
c) Resolution 22-R-25, To Award the Contract in Accordance with Bid FM-56 for Fleet
Maintenance Bay Door Replacement
d) Resolution 22-R-26, To Reschedule the July County Council Meeting and Cancel the
August County Council Meeting
e) Resolution 22-R-27, To Advertise Board Vacancies
f) Resolution 22-R-28, To Appoint Members to Board Vacancies
11. Items for Information and Public Record
12. Public Comments (3 minutes per person/max time 20 min.)
13. Council Time
a) CPST Project Discussion
14. Executive Session
a) Airport Commission – Airport Hanger
b) Airport Commission – State Legislative Action
15. Adjournment
16. Informal Meeting of the Whole
COUNTY COUNCIL MEETING ON MAY 3, 2022
Colleton County Council will hold a regular m eeting on Tuesday, May 3, 2022, at 6:00 pm. The
public will be able to stream the meeting fr om a link on the County’s home page or by going to
www.colletoncounty.org/live. Individuals who would like to participate in public comment can
do so at www.colletoncounty.org/comment.
County Council Meeting
April 12, 2022
1
MINUTES
TUESDAY, APRIL 12, 2022
REGULAR MEETING
6:00 P.M.
Colleton County Council
Council Chambers, Old Jail Building
109 Benson Street
Walterboro, SC 29488
Present: Chairman Steven Murdaugh called the meeting to order with Council Members Dr. Joseph
Flowers, Phillip Taylor, and Art Williams in at tendance, with Council Member Gene Whetsell
appearing virtually.
Others Included: Kevin Griffin, Sean Thornt on, Meagan Utsey, Jon Carpenter, Barry McRoy,
David Greene, Sue Keith, Terri Tomedolskey, Mark Wysong, Jamie Harrelson, Holland Maness,
Clarence Wiggins, Josh Rowla nd, Joseph Campbell, Janis Bloc ker, Carl Coffin, and Jimmy
Syfrett.
Phillip Taylor gave the invocation and led the Pledge of Allegiance.
Approval of Minutes
A. Regular Meeting April 12, 2022—Councilman Tayl or moved to approve the minutes of
the Regular Meeting held on April 12, 2022. The motion was seconded by Dr. Flowers and
the motion carried unanimously.
Awards and Recognitions
A. Colleton County Fire-Rescue – South Carolina EMS System of the Year Award
Chairman Murdaugh stated that this is the first time receiving this award, which is a big
honor for us. I would like to have Mr. McRoy come up and speak on the award. However,
there was a tragic incident that our fire department had to respond to. We received a very
nice email from a gentleman who was employed with DHEC at the time about the service
and response from our fire department. I would ask that Mr. McRoy or whomever he deems
appropriate to speak on that. Mr. McRoy firs t I would like to congratulate you and your
department. If you would come up and brie fly discuss this award and about the
accommodation you received from the gentleman.
Mr. McRoy stated that the EMS System of th e year award is something that spans about
two and half years of work. Our county is a very rural county and we have to carry patients
to Charleston on a regular basis to a trauma center. It takes about an hour to get to a surgeon
and sometimes patients don’t have an hour. We do try to fly them when we can, but
sometimes the helicopters are not available. Since we provide medics for the medivac
County Council Meeting
April 12, 2022
2
helicopter, our people have been trained to carry blood. We could not have done this
without Council approving to fund this and finance finding those funds. Joey Campbell
spent two years going to meetings trying to convince the doctors and all the different
committees that DHEC has, he went monthly for an entire year, trying to get them to allow
paramedics in the state of South Carolina to try this. He convinced them, we had a lot of
support from the trauma centers to let us do this, we proved in a year that it works, and that
it works well. There is absolutely no substitution to giving a patient blood, IV fluids just
stretches it for a little while, but it just doesn’t work. Mr. Campbell would you like to add
something, because you are the one who did most of the work.
Mr. Campbell stated that Mr. McRoy about covered it.
Mr. McRoy stated that it was a huge team ef fort and everyone that was involved with our
department worked very hard for it. There was a lot of stipulations that we had to meet and
our crews did a wonderful job following it. We did submit it for this year and we were
selected. We were very happy about it, because they don’t usually select fire departments
for the EMS system of the year award. We th ank y’all for your support, because without
y’all it wouldn’t have been possible.
Chairman Murdaugh stated that he believes that because of Colleton County’s efforts this
is available statewide.
Mr. McRoy stated that it is true, and DHEC actually changed the scope of practice for
paramedics in the state of South Carolina to allow any EMS system that wanted to fund it,
to carry blood. This is because of the project we pioneered.
Dr. Flowers stated that as a physician I am certainly proud that we have now and it is
certainly a life saving measure. IV Fluids just don’t cut it and I am happy that we are doing
this.
Mr. McRoy stated that the incident th at Chairman Murdaugh was speaking about,
unfortunately we had a tragic incident on Gadsden Loop were one of our local citizens
passed away in a house fire. We had two firefighters attempting to save the patient and they
got caught in what was determined to be a “f lash over”. This is a very rapidly changing
incident. When they entered the room there was not a whole lot of fire in there and it was
clear where they could see what was going on. In about 58 seconds they had just got to the
point where they could locate the patient, and the room flashed over. This is basically when
the room just blows up with fire. One of the guys almost didn’t get out, we had two
firefighters that were burned, we lost a set of turn out gear, and his helmet and coat were
on fire. The county funds some of the finest fire gear, so that is something we do not skimp
on, and what saved that firefighters life. Another thing is the training they go through. They
were trained on this type of in cident and it worked perfectly. If we didn’t have all these
County Council Meeting
April 12, 2022
3
things and the crews watching the scene like th ey were we might have had a firefighter
fatality.
Chairman Murdaugh stated he would like to congratulate them again.
Mr. Griffin stated that this is the second st atewide award that the county has received in
the last year. Dr. David Greene heads up our Emergency Management Division, and we
recently received the Emergency Management County Division of the year.
Councilman Williams stated that he would lik e to say congratulations and that you all
deserve it from the EMT to the director. I have witnessed so me of the work you all have
done. Dr. Greene you are doing an amazing job ge tting the information out to the county
especially when there is inclement weather.
Mr. McRoy stated that we appreciate your s upport, because we couldn’t do any of these
things without you.
B. Proclamation for Colleton County Council’s Recognition and Appreciation of Mr.
Gregory Kinsey and his Service to Colleton County— Chairman Steven Murdaugh read
the Proclamation aloud. Councilman Taylor moved to approve the Proclamation and the
motion was seconded by Councilman Williams. The motion carried unanimously
C. Proclamation for Colleton County Council’s Recognition and Appreciation of
Mr.
Patrick Thomas and his Service to Colleton County— Chairman Steven Murdaugh read
the Proclamation aloud. Councilman Williams moved to approve the Proclamation and the
motion was seconded by Councilman Taylor. The motion carried unanimously
Appearances and Public Presentation
A. Walterboro-Colleton Chamber of Commerce – Mark Wysong, President
Mr. Wysong stated he would first like to hand out a copy of the Business Journal and chamber
application for reference. I would like to give you an update of where the chamber stands and
where it has got to in the first 100 days since I have taken over. The biggest thing we have done is
we have changed the mission of the chamber. The mission statement of the chamber is very
different as it focuses on prosperity within the community and we are focused on helping existing
businesses become more prosperous. We are focused on helping improve the infrastructure within
our community. With that, we have changed the structure of the board. When I came on we had
six active board members, we will be losing th ree of those board members this month and are
looking to replace them with some new candidates, but we have added four to bring us back up to
eight. The biggest challenges that we faced when I took over the chamber were fairly obvious. The
ties severed between the county and the city crea ted a real problem for the business community,
so repairing those ties were first and foremost. The financial status of the chamber was struggling,
so one of the first things we did was eliminate all payroll for the chamber. Every dollar that comes
County Council Meeting
April 12, 2022
4
in the chamber goes back out as a resource for its member business. So, if you become a chamber
member you are assured that everything we have goes toward bringing your success. If you notice
the tier levels we have created, the bottom tier receives the most benefit with the top tier being the
benefactor bringing prosperity back into the lower tier businesses. Members like PRTC, Colleton
County Hospital, the school district, and Bee City are examples of benefactor businesses that are
helping support the smaller businesses. In order to do that we have done several things, the business
journal that is in front of you is produced and printed by the chamber, it is an insert into the Press
& Standard, and it is an ad fr ee 100% positive business journal. It covers all the aspects to the
people behind the businesses and why folks shoul d do business within Colleton County. We talk
about governmental affairs and we talk about things that are going on within the county and within
the city and help produce prosper ity within our members. We ta lk about legislation and updates
that are pertinent to businesses within the county. The second thing that we have done is created a
media production, TV producing studi o within our office that allows us to produce media and
marketing materials for our members. It airs ou tside of our county as well as inside the county.
We have partnered with PRTC. We also advertise from Georgeto wn all the way down to Hilton
Head. Our social media platforms garner in excess of 20,000 views within a week, so we get a lot
of eye balls on the things were doing. We are focused on providi ng our smaller businesses with
resources and in doing so we have a “we work” space in the front of our office. We see that a lot
of the smaller businesses don’t have a training ce nter, office space, or conference rooms, so we
provide all of that at no charge to our members as it is a pa rt of your membership. We have also
created after hours events to our members that are no charge as well. In doing that we have added
thirty-five businesses in the first 100 days. We are updating our website and doing everything we
can to promote prosperity among the community.
Chairman Murdaugh asked if the membership tiers are an upfront lump sum or are there payment
plan options.
Mr. Wysong replied that they do accept quarter ly payments starting at the $1500 level with no
interest or fees for doing this, but it does allow la rger businesses or people who want to receive
the full benefit to budget for it throughout the year . We very much would like to see the county
back into the chamber and we understand there is a lot required to do that, but we are working very
diligently to demonstrate the value we bring to the business owners and we would like to
demonstrate the same to the county.
Chairman Murdaugh thanked Mr. Wysong.
Administrator’s Briefing
Mr. Griffin stated we rolled out our new county website in the last week to ten days. We have tried
to make it a lot more interactive. There are a lot more forums and different things you can do
online. For example, you can apply to any of our boards and commissions online now. The
technology department has worked very diligently to get all of this done, and if there is anything
you would like to see added let us know. In regard to our litter control program, we have partnered
this month as part of the spring spruce up with SCDOT as well as Earth Day this month with some
County Council Meeting
April 12, 2022
5
funding council actually appropriated in the last budget. Starting as of yesterday for the next few
weeks, we will pick up approximately 52 miles of roadways. Just to give you an idea of where
they will be; Highway 17A going towards Cottageville, Sniders Highway going towards Snider’s
Crossroads, Bells Highway to Bells Crossroads, River Street, Robertson Blvd down to Green Pond
Highway, Poor Farm Road all the way to the railroad tracks on Green Pond, Clover Hill Road and
Ritter to Highway 17A, from the red light at Academy road and Highway 15 all the way to
Canady’s Crossroads, and also Mt. Carmel Road. Along with information on the website, we have
a number, 843-898-8300, to report litter hot spots. If you see an area where someone has been
littering, or an area we need to know about and po ssibly get enforcement action out there, please
call this number and report it, it will be confiden tial. There will also be a form on the website
where you can report that information. One item on the agenda I wanted to point out and then I am
going to let Mr. Rowland come up and tell you all where we are w ith the update on the zoning
ordinance. Item B, we did speak with council at the last few meetings in regard to finding a new
location for Voter Registration, which we have been trying to do for the last year to year and a
half. As you all know the new voting systems take up a lot more space than they used to, thankfully
PRTC was able to find us some more space in another building they had, but they are all spread
out all over the place. We have been able to get the contract on what was the old Rite Aid building
at the corner of Bells Highway and Jefferies Blvd. It is about an 11,000 sqft building with a drive
thru and some great spaces to be able to set up. I believe it is going to work great for the voters of
Colleton County as well as provide the storage that is greatly needed. This will be item “B” under
“New Business” which is first reading of an Ordinance for a lease purchase agreement that we will
be doing with South State Bank in order to purchase the building. Lastly, if our planning director,
Mr. Rowland, will come up. We just updated our co mprehensive plan and the state law requires
that we update our zoning ordinance.
Chairman Murdaugh asked before Mr. Rowland gets started are we addressing some of these items
under “Old Business”, Ordinance 03, 04, and 05?
Mr. Griffin answered yes we will address all three of those.
Chairman Murdaugh stated that Council is so ve ry confused on what has changed and what has
not changed and why we are having to do this. Is it all required or is part of it required? Hopefully
Mr. Rowland can shed some light on that for us.
Mr. Rowland stated to sum up a lot of your questions, yes, the zoning ordinance and planning and
development regulations do need to coincide with the comprehensive plan.
***At this time Mr. Rowland reviewed the Staff Re view Sheet with council. Please see attached
review sheet.
Dr. Flowers asked about the section of the code where the construction of agricultural structurers
is permitted in front of a dwelling.
Mr. Rowland replied, from my understa nding it is going to allow for agricultural structures to be
placed in the front set back range to follow a lot commercial zonings that would allow for that. In
the RD-1 and RD-2 Zoning Districts only, acce ssory structures of any size on ag ricultural
properties of 5 acres or more, may be located in the front yard between the principal structure and
County Council Meeting
April 12, 2022
6
be no closer than 50 feet from the front property line, if provided with a natural landscaped buffer
which has the opacity of a solid wall in accordance with section 14.08-4.020 (D)(3), to ensure
complete concealment of the structure from any public/private rights-of-way and on the sides
facing any residential dwelling un its located within 300 feet of the structure on any abutting
properties. 14.08-3.020 – Accessory Structures (A)(6 ) – Due to a recent Variance Case, the
placement of Accessory Structures on farmlands in only the RD-1 and RD-2 Zoning Districts has
been made more realistic and in line with Commercial Zoning Districts.
Chairman Murdaugh stated so this will actually make it less restrictive.
Mr. Griffin stated if you recall we had an issue come up or a couple of them. For example, you’re
in Smoaks and you have 40-60 acres and the indivi dual has their house set back off the road, but
they want to put a tractor shed up front to service it, the code did not allow that. It had to be at the
line or behind, so that is trying to address that to be more flexible with those larger lot areas.
Chairman Murdaugh stated that he actually went an d visited that site and he was trying to get a
waiver. Although one of these Ordinances are 190 pa ges it hasn’t changed a lot other than some
of the things that you discussed already tonight. I di d notice that at the top of these Ordinances it
states that the Planning Commi ssion reviewed them, and I am curious about the dates and the
reason for the gap in time.
Mr. Rowland replied that one reason was Covi d-19 and the other reason was the change in
directors. The previous director had finalized a few of the items with one of the major outstanding
items was review from DNR to make sure we were in compliance. So that was one of the hold ups,
in addition to the previous dir ector wanting to combine zoning di stricts. After talking to the
planning commission, and in my opinion it over comp licated things. We believed that it would
confuse the public so we reverted back to the or iginal way the code was read, and by doing that
we had to take it back in front of the Planning Commission.
Chairman Murdaugh stated in reference to Or dinance 22-O-03, I see the Planning Commission
was involved in that, I believe these are nuisances as to it relates to the land, but not noise. I know
we had some issues with some business establis hments. There is nothing in these particular
Ordinances that would help resolve any of that.
Mr. Griffin replied that is correct . We researched that with the county attorney and as we were
looking at a couple different instances, that actually has to fall back on law enforcement. There is
a process there to deal with those directly. One other item that I want to discuss involving the litter
control portion. We have actually given our litter en forcement officers the ability to write tickets
for litter enforcement. Prior to that we would actu ally have to get a Sheriff’s Deputy or Class 3
Officer to write the ticket. Chet and our other personnel working litter control can do that directly
now and don’t have to find someone to help them.
Councilman Williams stated that he noticed that Mr. Rowland said the state requires 2 feet and the
county is trying to promote 3 feet as far as the receptacles are concerned. I know we don’t want to
operate at minimum standards, but do you see at any point that this may create a hardship for any
County Council Meeting
April 12, 2022
7
of the residents by requiri ng in excess of what the state requir es? Also, how consistent are we in
Colleton County with other counties requiring the excess?
Mr. Rowland replied that we do not feel like this would incr ease a hardship. We looked at
Charleston County, and our Flood Plan Administrator just got out of a conference and a lot of other
counties are talking about moving up to that three feet. The biggest thing for us is last year when
the CBRS came in and did their 5 year review we actually lost points and it moved us from a seven
to an eight and we lost percentages from our in surance for the residents in the county. We spoke
with DNR and FEMA, about moving it up. FEMA’s regulation is that two feet, which again is bare
minimum. The one thing we were having an issue with, as well as, architects and engineers is there
is no consistency and it was creating confusion. Getting to the three feet not only allows for
consistency in architectural design, but also allows consistency for our plan reviews and benefits
the residence on flood insurance inside and outside the flood areas.
Councilman Whetsell asked if there is anything in these ordinances to help take care of the dogs.
Chairman Murdaugh replied I do not think this is the right ordinance for that.
Mr. Rowland stated that part of updating the zoning ordinance would be to update the zoning maps.
The primary areas are west of I-95, this would be the Colleton Mega Site. The comprehensive plan
mentioned that it would be for industrial use, so we have made those changes both in the Canady’s
area. Additionally to that, the Town of Lodge, in 2020 we had approved an ordinance for the
planning department to oversee everything that will be going on in their jurisdiction. In doing so
we never created a zoning map to have those sta ndards. We did a review of that and with our
recommendation; the Planning Commission reviewed and agreed to go for community commercial
within the center of the town. Both are going to be rural development 2, the light green, which will
be the majority of the county. Minimum lot size is half an acre and still allows for all the residential
agriculture uses. The one thing we can say by go ing through everything we are not creating any
non-conforming uses, so any existing will be able to maintain and grow. Th is is just giving the
opportunity for it to happen in a more rural nature instead of urban.
Dr. Flowers addresses Mr. Griffin and asked about the quantity of litter tickets that the county has
written.
Mr. Griffin replied that he can get that information.
Dr. Flowers stated that he would also like to know the dispositions made by the Magistrates. There
is a litter problem in this count y and we have got to get it clean ed up and enforce it. We need to
look at this when we are discus sing our budget for this year and see if we can’t do something to
get this county cleaned up.
Old Business
A. 2
nd Reading Ordinance 22-O-03, To Amend Ti tle 9 – Public Peace and Welfare,
Chapter 9.02 – Public Nuisance Generally and Chapter 9.04 – Littering, To Coincide
With The Ten Year Update Of The Colleton County Comprehensive Plan
County Council Meeting
April 12, 2022
8
Dr. Flowers moved to approve the 2nd Read ing Ordinance 22-O-03, To Amend Title 9 –
Public Peace and Welfare, Chapter 9.02 – P ublic Nuisance Generally and Chapter 9.04 –
Littering, To Coincide with th e Ten Year Update of the Colleton County Comprehensive
Plan. The motion was seconded by Councilm an Taylor. The motion was carried
unanimously.
B. 2nd Reading Ordinance 22-O-04, To Amend Title 13 – Buildings and Construction,
Chapter 13.04 – Construction Codes Adopted, Chapter 13.12 – Flood Damage
Prevention, Chapter 13.16 – Manufactu red Homes and Chapter 13.20 – Uniform
Ordinance Summons, To Coincide With The Ten Year Update Of The Colleton
County Comprehensive Plan
Councilman Taylor moved to approve the 2nd Reading Ordinance 22-O-04, To Amend
Title 13 – Buildings and Construction, Ch apter 13.04 – Construction Codes Adopted,
Chapter 13.12 – Flood Damage Prevention, Chapter 13.16 – Manufactured Homes and
Chapter 13.20 – Uniform Ordinance Summons, To Coincide With The Ten Year Update
Of The Colleton County Comprehensive Pl an. The motion was seconded by Councilman
Williams. The motion was carried unanimously.
C. 2nd Reading Ordinance 22-O-05, To Amend Title 14 – Land Management, Chapter
14.04 – Land Development Regulations And Chapter 14.08 – Zoning, To Coincide
With The Ten Year Update Of The Colleton County Comprehensive Plan
Dr. Flowers moved to approve the 2nd Reading Ordinance 22-O-05, To Amend Title 14 –
Land Management, Chapter 14.04 – Land Development Regulations And Chapter 14.08 –
Zoning, To Coincide With The Ten Year Update Of The Colleton County Comprehensive
Plan. The motion was seconded by Council man Williams. The motion was carried
unanimously.
New Business
A. 1st Reading Ordinance 22-O-06, By Title Only, To Provide for the Levy of Taxes in
Colleton County, South Carolina, for the Fiscal Year July 1, 2022 through June 30, 2023
to Provide for All Other Appropriations Thereof; and to Provide for Other Matters
Related Thereto
Councilman Williams moved to approve the 22-O-06, By Title Only, By Title Only, To
Provide for the Levy of Taxes in Colleton County, South Carolina, for the Fiscal Year July 1,
2022 through June 30, 2023 to Provide for All Other Appropriations Thereof; and to Provide
for Other Matters Related Thereto. This motion was seconded by Councilman Taylor. The
motion carried unanimously.
B. 1st Reading Ordinance 22-O-07, By Title On ly, To Authorize the Acquisition of
Certain Real Estate and Appurtenant Interests by Colleton County, South Carolina
County Council Meeting
April 12, 2022
9
by Mortgage Financing in the Amount of Not Exceeding $750,000; the Execution and
Delivery of Certain Instruments, Including a Mortgage Note by Colleton County; and
Other Matters Relating Thereto
Dr. Flowers moved to approve the 1st Read ing Ordinance 22-O-07, By Title Only, To
Authorize the Acquisition of Certain Real Es tate and Appurtenant Interests by Colleton
County, South Carolina by Mortgage Financing in the Amount of Not Exceeding $750,000;
the Execution and Delivery of Certain Instruments, Including a Mortgage Note by Colleton
County; and Other Matters Relating Ther eto. The motion was seconded by Councilman
Taylor. The motion carried unanimously.
C. Resolution 22-R-13, To Accept the Grant for the Colleton County Summer Feeding
Program for 2022
Councilman Williams moved to approve Resolution 22-R-13,
To Accept the Grant for the
Colleton County Summer Feeding Program for 2022. The motion was seconded by Dr.
Flowers. The motion carried unanimously.
D. Resolution 22-R-14, To Declare April as Fair Housing Month
Councilman Williams moved to approve Reso lution 22-R-14, To Declare April as Fair
Housing Month. The motion was seconded by Councilman Taylor. The motion carried
unanimously.
E. Resolution 22-R-15, To Approve a Policy of Non-Discrimination on the Basis of
Disability Status and to Designate an ADA Coordinator
Dr. Flowers moved to approve Resolutio n 22-R-15, To Approve a Policy of Non-
Discrimination on the Basis of Disability St atus and to Designate an ADA Coordinator.
The motion was seconded by Councilman Taylor. The motion carried unanimously.
F. Resolution 22-R-16, To Establish Priorities for the 2022 Annual CDBG County Needs
Assessment
Dr. Flowers moved to approve Resolution 22-R-16,
To Establish Priorities for the 2022
Annual CDBG County Needs Assessment. The motion was seconded by Councilman
Taylor. The motion carried unanimously.
G. Resolution 22-R-17, To Authorize a Five-Year Sole Source Purchasing Arrangement
for Kenworth Trucks
Dr. Flowers moved to approve Resolution 22-R-17, To Authorize a Five-Year Sole Source
Purchasing Arrangement for Kenworth Trucks. The motion was seconded by Councilman
Whetsell. The motion carried unanimously.
County Council Meeting
April 12, 2022
10
H. Resolution 22-R-18, To Award the Contract for the Resurfacing of South Carolina
Department of Transportation Roadways and Colleton County Roadways
Councilman Williams moved to approve Reso lution 22-R-18, To Award the Contract for
the Resurfacing of South Carolina Department of Transportation Roadways and Colleton
County Roadways. The motion was seconded by Councilman Taylor. The motion carried
unanimously.
I. Resolution 22-R-19, To Authorize the Submi ttal of a Grant Application for the
Bulletproof Vest Partnership (BVP) FY 2021 Award for the Purchase of Bulletproof
Vests
Dr. Flowers moved to approve Resolution 22-R-19, To Authorize the Submittal of a Grant
Application for the Bulletproof Vest Partnership (BVP) FY 2021 Award for the Purchase
of Bulletproof Vests. The motion was s econded by Councilman Whetsell. The motion
carried unanimously.
J. Resolution 22-R-20, To Advertise Board Vacancies
Dr. Flowers moved to approve Resolution 22- R-20, To Advertise Board Vacancies. The
motion was seconded by Councilman Whetsell. The motion carried unanimously.
K. Resolution 22-R-21, To Appoint Members to Board Vacancies
Dr. Flowers moved to a pprove Resolution 22-R-21,
To Appoint Members to Board
Vacancies. The motion was seconded by Coun cilman Williams. The motion carried
unanimously.
L. Resolution 22-R-22, To Declare April Child Abuse Prevention and Sexual Assault
Awareness Month
Councilman Williams moved to approve Reso lution 22-R-22, To Declare April Child
Abuse Prevention and Sexual Assault Aware ness Month. The motion was seconded by
Councilman Taylor. The motion carried unanimously.
M. Resolution 22-R-23, To Approve Amendment of the Agreement for Development of a
Joint County Industrial Park, by and be tween Charleston County, South Carolina
and Colleton County, South Carolina, Providi ng for the Development of a Jointly
Owned and Operated Industrial/Business Park, so as to Include Additional Property
in Charleston County as Part of the Joint County Industrial Park
Councilman Taylor moved to approve Reso lution 22-R-23, To Approve Amendment of
the Agreement for Development of a Join t County Industrial Pa rk, by and between
Charleston County, South Carolina and Colleton County, South Carolina, Providing for the
Development of a Jointly Owned and Operated Industrial/Business Park, so as to Include
County Council Meeting
April 12, 2022
11
Additional Property in Charleston County as Part of the Joint County Industrial Park. The
motion was seconded by Dr. Flowers. The motion carried unanimously.
N. Resolution 22-R-24, To Approve Amendment of the Agreement for the Establishment
of a Multi-County Industrial/Business Park for Properties Located in a
Redevelopment Project Area, by and betw een Charleston County, South Carolina
and Colleton County, South Carolina, Providi ng for the Development of a Multi-
County Industrial/Business Park, so as to Include Additional Property in Charleston
County as Part of the Multi-County Industrial/Business Park
Dr. Flowers moved to approve Resolution 22-R-24, To Approve Amendment of the
Agreement for the Establishment of a Multi-County Industrial/Business Park for Properties
Located in a Redevelopment Project Area, by and between Charleston County, South
Carolina and Colleton County, South Carolina, Providing for the Development of a Multi-
County Industrial/Business Park, so as to Include Additional Prop erty in Charleston
County as Part of the Multi-County Industrial/Business Park. The motion was seconded by
Councilman Williams. The motion carried unanimously.
Council Time
Councilman Taylor asked if council is riding together for the Rice Festival Parade or separate.
Councilman Williams stated he will be riding solo.
Chairman Murdaugh asked Ms. Brinson if she had received an application.
Ms. Brinson replied that we have not, but that she will handle the application process this week.
No further discussion.
Executive Session
Councilman Taylor moved to go into executive session to discuss the following: Real Estate–
Easement Green Pond Railway, Legal– CPST Re ferendum Procedures, Personnel– Fire-Rescue,
and Economic Development–Project Ruby. Councilman Williams seconded the motion. The
motion carried unanimously.
Councilman Williams moved to exit executive session. Councilman Whetsell seconded the
motion, which carried unanimously.
Chairman Murdaugh stated that we were back in open session, during Executive Session we
discussed: Real Estate–Easement Green Pond Railway, Legal– CPST Referendum Procedures,
Personnel– Fire-Rescue, and Economic Development–Project Ruby.
Chairman Murdaugh moved to approve pay increases for the Library in accordance to discussions
pursuant to executive session from the library reserve fund. Dr. Flowers seconded the motion,
which carried unanimously.
County Council Meeting
April 12, 2022
12
Chairman Mudaugh moved that we renew the Capital Project Sales Tax Referendum and that we
proceed and move forward and direct the Capita l Project Sales Tax Committee to move forward
with the referendum. Dr. Flowers seconded the motion, which carried unanimously.
Chairman Murdaugh moved to authorize pay increas es as discussed in ex ecutive session for the
fire-rescue commission. Dr. Flowers seconded the motion, which carried unanimously.
Adjournment
Councilman Taylor moved to adjourn the meeting, Councilman Williams seconded the motion,
which carried unanimously.
This ___ day of May, 2022. ______________________________
Steven D. Murdaugh, Chairman
ATTEST:
______________________________
Kaela Brinson, Clerk to Council
**The remainder of this page intentionally left blank.
Sponsor(s) : County Council
First Reading : February 1, 2022 I, __________, Council Clerk,
Committee Referral : N/A certify that this Ordinance was
Committee Consideration Date : N/A advertised for Public Hearing
Committee Recommendation : N/A _______________.
Second Reading : March 1, 2022
Public Hearing : April 5, 2022
Third Reading : April 5, 2022
Effective Date : Immediately
ORDINANCE NO. 22-O-02
COUNCIL-ADMINISTRATOR FORM OF GOVERNMENT FOR COLLETON COUNTY
[An Ordinance Authorizing the Execution of a Temporary Lease Agreement Between
Colleton County and Causie Contracting, Inc. for the Staging of Personnel and Equipment
related to the I-95 Construction and Repaving from St. George to Point South.]
WHEREAS:
1. Causie Contracting, Inc. contacted the Count y and requested to temporarily lease the
property located at 153 Risher Mountain Road for the staging of personnel and equipment
related to the I-95 construction and repaving from St. George to Point South; and
2. County Council deems it to be in the best intere sts of the County to authorize this temporary
lease.
NOW THEREFORE BE IT ENACTED BY THE COLLETON COUNTY COUNCIL
DULY ASSEMBLED THAT:
1. Pending approval of the document by the Count y Attorney, the County Administrator is
authorized to execute on beha lf of the County a Temporary Lease Agreement with Causie
Contracting, Inc. for the staging of personnel and equipment related to the I-95 construction
and repaving from St. George to Point South.
2. Severability:
If any provision of this Ordinance or the appli cation thereof to any person or circumstance is
held to be invalid, the invalidity does not aff ect other provisions or applications of the
Ordinance which can be given effect without th e invalid provision or application, and to this
end, the provisions of this Ordinance are severable.
3. Conflict:
Provisions in other County Ordinances, Resolutions, policies, or by-laws in conflict with this
Ordinance are hereby repealed.
2
ATTEST: SIGNED:
_________________________ _____________________________
Kaela Brinson, Council Clerk Steven D. Murdaugh, Chairman
____________________________ COUNCIL VOTE:
Approved as to Form OPPOSED:
Sean Thornton, County Attorney
Sponsor(s) : County Council
First Reading : March 1, 2022 I, ____________________,
Committee Referral : N/A Council Clerk, certify that this
Committee Consideration Date : N/A Ordinance was adverti sed for
Committee Recommendation : N/A Public Hearing on __ _____.
Second Reading : April 5, 2022
Public Hearing : May 3, 2022
Third Reading : May 3, 2022
Effective Date : Immediately
ORDINANCE NO. 22-O-03
COUNCIL-ADMINISTRATOR FORM OF GOVERNMENT FOR COLLETON COUNTY
[TO AMEND TITLE 9 – PUBLIC PEACE AND WELFARE, CHAPTER 9.02 – PUBLIC
NUISANCE GENERALLY AND CHAPTER 9.04 – LITTERING, TO COINCIDE WITH
THE TEN YEAR UPDATE OF THE COLLETON COUNTY COMPREHENSIVE
PLAN.]
WHEREAS:
1. Title 9 – Public Peace and We lfare, Chapter 9.02 – Public Nuisance Generally and Chapter
9.04 – Littering, of the Colleton County Code of Ordinances we re reviewed by the Planning
Commission on August 24, 2020 and October 26, 2020; and
2. Chapters 9.02 and 9.04 were edited for le gal sufficiency, redundancy and/or unnecessary
words and phrases, and updated and clarified simp lified phrases in order to be current with
the accepted American Planning Association (APA) principles and practices; and
3. County Council believes it is in the best interest of the citizens of Colleton County to approve
the changes set forth herein.
NOW, THEREFORE, BE IT ORDAINED BY COLLETON COUNTY COUNCIL, DULY
ASSEMBLED, THAT:
1. Title 9 – Public Peace and Welfare, Chapter 9.02 – Public Nuisances Generally, of the
Colleton County Code of Laws (the same being inclusive of and one with the Originating and
Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality to
read as follows:
CHAPTER 9.02. - PUBLIC NUISANCES GENERALLY
Sections:
9.02.010. - Public nuisances—General.
9.02.020. - Definitions.
9.02.030. - Unlawful property nuisance.
9.02.040. - Public nuisance declared.
9.02.050. - Responsibility for property maintenance.
9.02.060. - Right to enter property to inspect or abate.
9.02.070. - Abatement procedure/compliance order.
9.02.080. - Voluntary correction.
9.02.090. - Demolition permit fee waiver.
9.02.100. - Mobile home moving permit—Fee waived for salvage.
9.02.110. - Abatement by county.
9.02.120. - Penalties.
9.02.130. - Exemptions.
9.02.140. - Means of appeal.
9.02.010. - Public nuisances—General .
Public nuisances can substa ntially degrade residential and business areas, decrease
property values, and promote rural blight and deterioration and ofte n violate health and
sanitation requirements. This law has been adopted for Co lleton County residents to
provide for steady and consistent improvement of the general health, safety, and welfare,
in the unincorporated areas of Colleton County.
9.02.020. - Definitions.
The following words, terms and phrases, when used in this chapter, shall have the
meanings ascribed to them in this section, except where the contex t clearly indicates a
different meaning:
Abatement means action to terminate, stop, cease, repair, rehabilitate, replace, demolish,
remove, correct or otherwise remedy or cure nuisance activity, conditions, premises or
conduct by such means as to bring the nui sance into compliance with the codes of
Colleton County and/or the State in such a manner as is necessary to promote the general
health, safety and welfare of the public.
Compliance officer means the county planning and de velopment director (hereinafter
director), zoning administrator, code enforcement officer, litter control officer, floodplain
administrator, sheriff’s deputies, and fire ma rshal, or anyone qualified that the director
designates to act in such capacity on his be half, or anyone designated as such by the
county administrator.
County means Colleton County, South Carolina.
Minor means any person under 18 years of age, and who is not emancipated.
Motor vehicle means every vehicle that is self-p ropelled, to include automobiles,
airplanes, motorcycles, watercraft, tractor trailer rigs, heavy equipment, farm tractors and
equipment, and/or other such mechanized devices.
Owner means the owner or owners of any premises or real or personal property.
Premises means any location, building or structur e, lot, parcel, property, land or portion
thereof.
Public nuisance means any condition, activity or device located on premises, which
constitutes a health or safety hazard and/or which is or may be unsafe or dangerous or
which may reasonably be expected to attract children to the premises and risk injury by
their playing with, in, or on it.
Responsible party or person means any individual, business or entity responsible for
creating, causing, maintaining or permitting the nuisance activity, premises, condition or
conduct; and includes, but is not limited to, th e property owner, tenant, lessee, possessor,
or occupant, the president or officers of a corporation or business.
9.02.030. - Unlawful property nuisance.
It is unlawful for any person owning, re nting, leasing, occupying, managing or having
charge of, or possessing any real property in the county to maintain such premises in such
a manner that any of the following conditions exist thereon:
A. An abandoned house or manufactured home such as:
1. An unoccupied and unsecured house or manufactured home that allows access
into the dwelling;
2. A partially set up, reconstructed, or demolished house or manufactured home
where work is abandoned for 120 consecutive days;
3. A damaged or partially destroyed hous e or manufactured home not removed
or repaired within 120 days after the damage or destruction;
4. A house or manufactured home that is extensively deteriorated, does not have
approved and/or operable utilities, such as water, and/or septic service.
B. Property maintained in a condition so defect ive, unsightly, or in a state of such
deterioration, disrepair or neglect that it cau ses a health, safety or fire hazard or a
public nuisance to children or others such as:
1. The accumulation of dirt, litter, refuse, trash or debris in carports, parking
areas, driveways, front, side, or rear ya rds, vestibules, doorways, roofs, or on
an adjoining sidewalk, easement, access-way, or alley;
2. Storage of personal property (other than items designed for outdoor use) in the
front, side, or rear yards visible from public roads or neighboring properties,
including, but not limited to, aban doned, unregistered, inoperative, broken,
dismantled, or discarded motor vehicles or parts, building materials not
currently being used for the constr uction of improvements on the site,
appliances, household furniture or furnis hings, equipment, tools, machinery,
garbage bags or cans, boxes, trash, debris, or rubbish.
C. Any type of vegetation which is rotte d, dead, decayed, diseased, overgrown, or
likely to fuel a fire, harbor rats, snakes, insect infestations, or other vermin, or
which is detrimental to neighboring properties and property values. This
subsection shall be applicable to ever y property where any type of building,
facility or other structure is located, re gardless of the condition of the structure.
This subsection shall not apply to:
1. Property in its natural, undisturbed and unimproved st ate, or property devoid
of any structures that hasn’t been improved or occupied for at least 15 years;
2. Property used primarily for agricultural purposes;
3. Natural wildlife areas, open fields, swam ps, marshes, glades, or other similar
types of natural settings.
D. The discharge of sewage or untreated wa stewater into any body of water, yard,
open ditch, storm sewer or onto any abutting property.
E. A motor vehicle that is unlicensed, unregistered, i noperable, abandoned, and/or
derelict upon any street, road, thoroughfare, or property.
F. Any clothing, linen, towels, laundry, rugs, mattresses, and other similar material
hung, placed, or attached to pow er lines, trees, bushes, fences, buildings, railings,
or walls and visible from public roads or neighboring properties.
G. Any violation of the zoning codes, such as using property in violation of the
provisions of any zoning di strict, conditional use, sp ecial exception, planned
development, variance or any other land use entitlement or permit.
H. Any house, manufactured home, property, condition or activity which is deemed a
"public nuisance" as defined by the State of South Carolina.
9.02.040. - Public nuisance declared.
Any property found to be in violation of any of the provisions of section 9.02.030 is declared
a public nuisance and shall be abated pursuant to the procedures set forth herein which shall
not be exclusive nor lim it or restrict the county from enfo rcing other county ordinances or
abating public nuisances in any manner provided by law.
9.02.050. - Responsibility for property maintenance.
Every responsible party who owns or occupies property within the county is required to
maintain such property in a manner that does not violate the provisions of this chapter.
9.02.060. - Right to enter property to inspect or abate.
Any compliance officer of the county must s ecure permission from the property owner to
inspect or abate any premises whenever nece ssary to secure compliance with, or prevent
violation of, any provision of this chapter. Wher e a violation is in cl ear view from a public
road or any surrounding propert y, on which permission has b een granted to enter, the
compliance officer may issue a summons for the violation.
9.02.070. - Abatement procedure/compliance order.
A. Whenever the compliance officer determines that any property is maintained in
violation of any of the provisions of this chapter, they shall serve upon one or more of
the responsible parties a written compliance order citing:
1. The date and location of the violation(s);
2. The section(s) of the code(s) violated and a brief description of the violation(s);
3. The actions required to correct the violation(s) or abate the condition(s);
4. The time period after which the county will enter the prope rty to abate the
condition(s).
B. The time period for abatement shall be at least 30 days, unle ss determined by the
compliance officer that the conditions consti tute an imminent threat to the public
health, safety or welfare. The compliance officer may grant an extension of up to 180
days upon good cause, provided the responsible party sign s a written agreement to
voluntarily abate the nuisance by a date cer tain. The zoning board of appeals may
grant a one-time extension of up to 180 a dditional days to the time provided by the
compliance officer, where the board deems such extension is warranted.
C. Service under this section may be accomplis hed by direct personal delivery to such
persons, but if the whereabouts of the re sponsible persons ca nnot be ascertained
through reasonable diligence, the serving of the compliance order may also be made
by publishing it once each week for two consecu tive weeks in a newspaper of general
circulation in the county and notice shall be posted on the property and allowed to
remain for up to 30 days and shall indicate the nature of the vi olation, identification
of the property affected, with date of posting, and contact information.
9.02.080. - Voluntary correction.
A. Applicability. This section applies when the county compliance officer determines
that a violation of county codes or regulations has or is occurring.
1. General. The compliance officer shall pursue a reasonable attempt to secure
voluntary correction by causing written noti ce to be given to the violator where
possible, or to the owner of record at the assigned E-911 address, explaining the
violation(s), the abatement required with deadline, and the appeals process.
2. Issuance of voluntary correction agreem ent. A voluntary correction agreement
may be entered into between the viol ator and the county, acting through the
director.
B. Content of voluntary correcti on agreement. The voluntary correction agreement is a
contract, between the county, represented by the director, and the violator, under
which the violator agrees to abate the violation within a specified time and according
to specified conditions. The timeframe shall be as short as possible, not to exceed 180
days, and may have measurable milestones at a maximum of 45-day intervals. The
voluntary correction agreement shall include the following:
1. The name and address of the violator;
2. The E-911 street address, property/parcel TMS number, or a description sufficient
for identification of the premises, house, manufactured home, property, or land
upon or within which the violation(s) has or is occurring;
3. A description of the violation(s) and a reference to the provision of the county
Code section(s) or regulation(s) which have been violated;
4. The necessary corrective action(s) to be taken, and a date certain by which
correction(s) must be completed, phased if necessary, with de fined requirements
for task completion at specific intervals;
5. An agreement by the violator that the county may abate the violation(s) and
recover its costs and expenses and a mone tary penalty pursuant to this chapter
from the violator, if the terms of the voluntary correction agreement are not met;
and
6. An agreement that by entering into the voluntary corrective agreement, the
violator waives the right to an administrati ve appeal of the violation(s) and/or the
required corrective action.
C. Right to a hearing waived. The violator waiv es the right to an administrative appeal
of the violation(s) and the required co rrective action upon entering into a voluntary
corrective agreement.
D. Abatement by the county. The county may abat e the violation(s) if the terms of the
voluntary corrective agreement are not met, in accordance with section 9.02.110.
9.02.090. - Demolition permit fee waiver.
The demolition permit fee charged by Colleton C ounty is waived for a ny responsible party
who is correcting a condition citable under this chapter.
A. Any county resident who loses a house or mobile home in a fire may dispose of the
fire debris at the Colleton County Landfill at no charge. This fee waiver does not
apply to any commercial building or structure.
B. Any metal from the burned house or mobile home must be separated from the debris,
and if brought to the landfill, be deposited in the metal recycling area.
C. No hazardous materials or regular household waste/garbage may be included with the
fire debris.
9.02.100. - Mobile home moving permit—Fee waived for salvage.
The delinquent tax office is authorized to waive the permit fee for moving a mobile home for
the purpose of salvage. Such permits shall be issued only when the mobile home is being
dismantled in a salvage operati on, and the permit shall incl ude the name, address, and
telephone number of the salvage company; th e address where the mobile home is being
moved from; the name, address, and telephone nu mber of the current owner of the mobile
home; and any other information required by the delinquent tax office.
9.02.110. - Abatement by county.
A. Should any property owner, agent or occupant fail to comply with an order to abate
violations of such property, the county re serves the right, in addition to other
penalties, to cause by proper means such prope rty to be abated of violations. The cost
of such abatement shall be billed to the owner, agent, or occupant to be paid in full
within 30 days. In addition, an administrative fee of $50.00 or 15 percent of the actual
cost of abatement, whichever is greater, shall be applied to the cost. Whenever said
bill has not been paid within the prescribed time pe riod, the county shall apply all
costs as a lien on the property; and/or such costs shall be applied to the annual tax
levied and shall be collected by the county in addition to annual property tax; or
collection shall be achieved by other means, as may be available, and provided by
law.
B. Payment of such liens placed by the county against abated property may be
negotiated by the director when such negotiati on is deemed to be in the best interest
of the county. The director shall be author ized to waive up to 50 percent of the lien
within the first five years after the recording of the lien, and up to 25 percent within
five to seven years after r ecording. No negotiation shall occur for any lien waivers
beyond seven years from recording. Such negotiated liens must be paid in full.
9.02.120. - Penalties.
A. Any person who violates any provision of this chapter is guilty of a misdemeanor
and, upon conviction, must be fined not mo re than $500.00 per violation and/or be
imprisoned for not less than two days nor more than 30 days. No fine imposed
pursuant to this chapter may be susp ended to less than $250.00. No sentence of
imprisonment imposed pursuant to this chapter may be suspended. Any punishment
including fines imposed pursuant to a crim inal conviction for a violation of this
chapter shall be separate and apart fr om any inspection costs and cleanup or
abatement costs incurred by the county in abating said nuisances; and shall be in
addition to all other remedies availabl e to the county under state law and local
ordinances.
B. Each day that the nuisance continues to exist shall constitute a new and separate
violation.
9.02.130. - Exemptions.
A. The motor vehicle provisions of this chapter shall not apply to the following:
1. Authorized salvage yards and other re lated businesses duly operated, regulated,
and in compliance with all other county ordinances.
2. Vehicles which bear current "antique" li cense plates as issued by the state
department of motor vehicles.
3. Any motor vehicle which is in relati vely good condition, can be moved under its
own power, and can pass a vehicle safety inspection, yet does not have current
license plates due to owner's illness or other reasonable and verifiable causes as
determined by the director or his designated compliance officer.
4. Motor vehicles properly stored within an enclosed building or an opaque fence or
enclosure, so as not to be visible, as determined by the director or his designated
compliance officer.
5. Where a permit has been attained from th e planning and development department
for vehicles for sale, when such vehi cles are operable but don’t bear current
license plates (such permit should not exceed 120 days).
6. Authentic/verifiable stock, dirt track, or dr ag race cars or other relevant race cars
or motor vehicles which are being used on a regular basis, are able to move under
their own power, and have been determin ed by the director or his designated
compliance officer to be true race cars or motor vehicles.
B. This chapter shall not be applicable to farm storage vessels, such as school buses or
storage containers, when such containers are screened from public view, used
primarily for agricultural purposes, and are clearly used regularly.
9.02.140. - Means of appeal.
A. The zoning board of appeals, established in section 14.08-7.010, shall hear all appeals
originating from actions taken pursuant to this chapter.
B. Application for appeal. Any person directly affected by a decision of the compliance
officer or a notice or order i ssued under this chapter shall have the right to appeal to
the board of appeals, provided that a written application fo r appeal is filed within 30
days after the day the decisi on, notice, or order was served at the property, to the
person responsible, or to the owner. An a pplication for appeal shall be based on a
claim that the true intent of this Code or the rules legally adopted hereunder have
been incorrectly interpreted, the provision(s) of this Code do not fully apply, or the
requirements of this Code are adequately sa tisfied by other means, or that the strict
application of any requirement of this Code would cause undue hardship.
C. Notice of meeting. The board shall hear the appeal at their next regularly scheduled
monthly meeting, where enough time exists to publish the require d public notice in
advance of the meeting.
D. Open hearing. All hearings before the board shall be open to the public and be
published in a newspaper of general circul ation 15 days prior to the hearing. The
appellant, the appellant's representative, the compliance officer, and any person
whose interests are affected shall be given an opportunity to be heard. A quorum shall
consist of a majority of the five member board.
E. Procedure. The board shall adopt and ma ke available to the public, through the
secretary, procedures under which a hearin g shall be conducted. The procedures shall
not require compliance with strict rules of evidence, but shall mandate that only
relevant information be received, as determined by the director.
F. Board decision. The board may uphold, modi fy, or reverse the decision of the
compliance officer or grant a one-time exte nsion of no more than 180 days additional
to the days already granted by the complian ce officer for abatement. Such decisions
shall only be made by a concurring vote of a majority of the board members present.
G. Records and copies. The decision of the boa rd shall be recorded. Copies shall be
furnished to the appellant and to the director.
H. Administration. The director shall cause th e compliance officer to take immediate
action in accordance with the decision of the board.
I. Court review. Any person, whether or not a pr evious party of the appeal, shall have
the right to appeal to the circuit court.
J. Stays of enforcement. Appeals of notice a nd orders (other than imminent danger
notices) shall stay the enforcement of the notice and order until the appeal is heard by
the appeals board.
2. Title 9 – Public Peace and Welfare, Chapter 9.04 – Littering, of the Colleton County
Code of Laws (the same being inclusive of and one with the Originating and Amending
Ordinances), and all subparagraphs thereof, is hereby amended in its totality to read as
follows:
CHAPTER 9.04. - LITTERING
Sections:
9.04.010. – Definitions.
9.04.020. – Control of litter.
9.04.030. - Enforcement.
9.02.040. - Penalities.
9.04.010. - Definitions.
For the purposes of this chapter, the followi ng terms, phrases, or words shall have the
meanings stated herein unless their use in the text of this chapter clearly demonstrates a
different meaning.
Compostable trash means every waste accumulation of bi ological vegetation that is free of
dirt, rocks, non-compostable trash and bulky items.
Construction site means any property upon which a new building is being constructed, or
repairs, additions or the demolition of an existing structure is taking place.
Cover means any device, equipment, container, tarp, chain, rope, wire, or line used to prevent
any part of a vehicle’s load from shifting or escaping in any manner from the vehicle.
Derelict property means any property which has been left abandoned or unprotected from the
elements, including but not limited to, wrecked or partially dismantled motor vehicles and
parts, trailers, machinery, appliances, building materials, and other articles.
Elements means the natural elements which are a reasonably foreseeable means of carrying
litter from one place to another. Elements shall include, but not be limited to, wind, fire, rain,
water current and animals.
Garbage, litter and/or refuse means garbage, litter, rubbish, refuse, and trash collectively
which includes any man-made, nature-made, animal or vegetable waste byproducts of any
kind or nature whatsoever that can decompose, rot and/or decay, that attracts vermin and/or
insects and creates a public h ealth, safety, or fire hazard, or any other kind of a public
nuisance.
Handbill means any paper, poster, circular, c oupon, advertisement, or pamphlet to be
circulated for the purpose of making some announcement, except newspapers.
Loading or unloading dock means any dock or area used in the process of receiving,
shipping, and/or transporting goods, wares, commodities, and persons.
Newspaper means any newspaper of general circulat ion, as defined by general law, and in
addition thereto, any periodical or current magazine regularly published with not less than
four issues per year and sold or distributed to the public.
Person means any individual, owner or less ee, firm, business, partnership, sole
proprietorship, association, corporation, comp any, not-for-profit organization, or any
governmental entity.
Private property means any land, dwelling, building or other structure belonging to, or
restricted for the use or enjoyment of partic ular persons. Public property means any land,
property, street, road, highwa y, alley, public right-of-way or easement, median, sidewalk,
path, bridge or other way, building, or struct ure in which the public has a right to use,
whether publicly or privately owned.
9.04.020. - Control of litter.
A. Littering prohibited. It is unlawful for any pe rson to throw, discard, or deposit garbage,
compostable trash, or derelict property in any manner or amount in or upon any property,
highway, street, body of water, ditch, creek, park, etc., w ithin the count y except in
receptacles authorized and provided for that purpose.
B. Loads on vehicles. No person sh all drive, move, park, or in any other way operate any
vehicle within the county unless said vehicle is loaded so as to prevent any of its load
from shifting or escaping therefrom.
1. Any vehicle transporting or hauling material such as garbage, compostable trash, or
derelict property or any othe r material that could escape the vehicle, must be covered
and/or secured with a tarp or other appropriate cover or tie-down, as defined herein.
2. Any driver or other person in direct contro l of any vehicle from which any materials
or objects have escaped shall immediately cause said material to be cleaned up at
his/her own expense.
3. When any litter is thrown or discarded from any type of motor vehicle the operator or
owner, or both, shall be deemed in violation of this section.
C. Handbills. No person shall cause any handbill to be thrown, scattered, deposited or
distributed upon any public or private motor ve hicle, sidewalk, street, lane, alley, ground,
pole, tree, fence, structure or building with in the county., It shall not be unlawful to
distribute handbills to private residences, offices , or mercantile establishments if they are
handed in at the door or securely fastened to reasonably prevent them from being
scattered about by the elemen ts or as otherw ise specifically a llowed by other
ordinance(s).
D. Maintenance of property and receptacles.
1. All persons shall store their garbage in leak -free, covered containers to eliminate the
elements from spreading the debris and uns ightly garbage about the property owned,
managed, or controlled by them. Spillage a nd overflow around containers shall be
cleaned up as quickly as possible after it occurs.
2. No person shall sweep or deposit any accumu lation of garbage or derelict property
into any gutter, street, parking lot, wate r body or waterway, or other property within
the county.
3. All construction and demolition sites shall maintain on-site receptacles throughout the
duration of the work being performed as a means to secure any loose debris, building
material wastes, and other garbage and de relict property from being scattered about
the site, if the materials are not otherwise properly disposed of on a regular basis.
4. It shall be the responsibility of every owne r, manager, or occupant of any public or
private property or place to provide, and maintain adequate and suitable receptacles
and/or containers capable of containing any garbage or derelict property until proper
final disposal is accomplished.
5. Any unauthorized accumulation of uncontained garbage, compostable trash, and/or
derelict property on any public or private property is a violation of this chapter.
6. The owner, operator, or manager of a lo ading or unloading dock shall constantly
maintain the dock area in such a manner that litter will be prevented from being
carried by the elements to adjoining premises, streets, etc.
7. The owner, manager, or operator of any commercial-residential, commercial, or
industrial public place, shall constantly maintain the prem ises clean of all litter and
take measures to contain said litter on the property. It is unlawful to permit the
uncontained accumulation of litter thereon or the dispersion of litter therefrom.
E. Convenience sites and dumpsters.
1. Except where specifically authorized by fo rmal council agreement, Colleton County
convenience sites are restri cted for use by Colleton County residents only. Any non-
resident caught in the act or caught thr ough prima facie evidence shall be found in
violation of this chapter.
2. Any person who improperly uses any Co lleton County dumpst er by placing the
wrong materials not specifically called for di sposal in said dumpst er, such as placing
metal in a “plastics only” dumpster, is in violation of this chapter.
3. Any person who shall deposit trash on the ground instead of in a dumpster is in
violation of this chapter.
4. All commercial developments shall use their assigned garbage collection containers
and maintain them in a clean, and aes thetically pleasing condition. All such
containers shall be located on a site as and where approved by the collection agency,
which shall be outside of any public right-of-way.
5. It is unlawful for any person to allow a refuse container to remain unemptied for more
than ten consecutive days.
A violation of this section may be abated by the county; provided, however, that the
container in question may be impounded and a lien may be executed against any property
held in connection with the business of collecting refuse, waste, or garbage by the person
alleged to be in violation of this section.
9.04.030. - Enforcement.
A. All county animal, environmental, and litte r control officers, and code enforcement
officers, and all certified sheriff's deputies are considered compliance officers and they
are empowered to enforce the provisions of this chapter.
B. Only Sheriff’s deputies can execute warrants for arrest, but all compliance officers are
empowered to issue citations, and other proce sses issued by the cour ts in enforcing the
provisions of this chapter. In addition, the mailing by cer tified return-receipt-requested
mail of such process to the violator’s last pl ace of residence shall be deemed as personal
service upon the person charged.
C. Prima facie evidence.
1. If the throwing, dumping, or depositing of litter was done from a motor vehicle,
except a motor bus, it shall be prima faci e evidence that the throwing, dumping, or
depositing was done by the driver of the motor vehicle.
2. If discarded litter can be identified with a person's name, it shall be prima facie
evidence that the throwing, dumping, or depositing was done by the person whose
name appears in the discarded litter.
9.04.040. - Penalties.
A. Any person who violates any provision of this chapter is guilty of a misdemeanor and,
upon conviction, must be fined not more than $500.00 and/or be imprisoned for a period
of not less than two days nor more than 30 da ys. No fine imposed pursuant to this section
may be suspended to less than $250.00. No sentence of imprisonment imposed pursuant
to this section may be suspended.
B. In addition to the fine or term of imprisonment, the court may also impose eight hours of
litter-gathering labor for a first conviction, 16 hours for a second conviction, and 24 hours
for a third or subsequent conviction, all under th e supervision of the court; or such other
term of litter-gathering labor or public service as the court deems appropriate.
C. Any punishment including fines imposed pursuant to a conviction for a violation of this
chapter shall be separate and apart from any cleanup or abatement costs incurred by the
county in abating said littering; and shall be in addition to all other remedies available to
the county under state law and local ordinances.
3. Severability:
If any provision of this Ordinance or the application thereof to any person or circumstances is
held invalid, the invalidity doe s not affect other pr ovisions or applications of the Ordinance
which can be given effect without the invalid provision or applicatio n and to this end, the
provisions of this Ordinance are severable.
4. Conflict:
Provisions in other County Ordinances, Resolutions, policies, or by-laws in conflict with this
Ordinance are hereby repealed.
ATTEST: SIGNED:
________________________ __________________________
Kaela Brinson, Council Clerk Steven D. Murdaugh, Chairman
____________________________ COUNCIL VOTE:
Approved as to Form OPPOSED:
Sean Thornton, County Attorney
Sponsor(s) : County Council
First Reading : March 1, 2022 I, ____________________,
Committee Referral : N/A Council Clerk, certify that this
Committee Consideration Date : N/A Ordinance was adverti sed for
Committee Recommendation : N/A Public Hearing on __ _____.
Second Reading : April 5, 2022
Public Hearing : May 3, 2022
Third Reading : May 3, 2022
Effective Date : Immediately
ORDINANCE NO. 22-O-04
COUNCIL-ADMINISTRATOR FORM OF GOVERNMENT FOR COLLETON COUNTY
[TO AMEND TITLE 13 – BUILDINGS AND CONSTRUCTION, CHAPTER 13.04 –
CONSTRUCTION CODES ADOPTED , CHAPTER 13.12 – FLOOD DAMAGE
PREVENTION, CHAPTER 13.16 – MANUF ACTURED HOMES AND CHAPTER 13.20
– UNIFORM ORDINANCE SUMMONS, TO COINCIDE WITH THE TEN YEAR
UPDATE OF THE COLLETON COUNTY COMPREHENSIVE PLAN.]
WHEREAS:
1. Title 13 – Buildings and Construction, Ch apter 13.04 – Construction Codes Adopted,
Chapter 13.12 – Flood Damage Prevention, Chapter 13.16 – Manufactured Homes and
Chapter 13.20 – Uniform Ordinance Summons, of the Colleton County Code of Ordinances
were reviewed by the Planning Commission on October 26, 2020, November 23, 2022 and
March 28, 2022; and
2. Chapters 13.04, 13.12, 13.16 and 13.20 were edited fo r legal sufficiency, redundancy and/or
unnecessary words and phrases, and updated and cl arified simplified phrases in order to be
current with the accepted American Planning A ssociation (APA) principles and practices;
and
3. County Council believes it is in the best interest of the citizens of Colleton County to approve
the changes set forth herein.
NOW, THEREFORE, BE IT ORDAINED BY COLLETON COUNTY COUNCIL, DULY
ASSEMBLED, THAT:
1. Title 13 – Buildings and Construction, Chapter 13.04 – Construction Codes Adopted, of
the Colleton County Code of Laws (the same being inclusive of and one with the Originating
and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality
to read as follows:
CHAPTER 13.04. – BUILDING CODES ADOPTED
Sections:
13.04.010. – Adoption by reference.
13.04.010. – Adoption by reference.
A. 1. The following codes are adopted by reference as though they were copied herein
fully:
International Building Code—2018 Editi on (IBC 2018), including Chapter 1;
International Energy Conservation Code—2009 Edition;
International Fire Code—2018 Edition (IFC 2018);
International Fuel Gas Code—2018 Edition (IFGC 2018);
International Mechanical Code—2018 Edition (IMC 2018);
International Plumbing Code—2018 Edition (IPC 2018);
International Residential Code—2018 Ed ition (IRC 2018), including Chapter 1;
and
International Swimming Pool and Spa Code—20182 Edition (ISPSC 2018);
(International Codes will include South Carolina Modifications)
National Electrical Code—2014 Edition;
NFPA 70 – National Electric Code 2017 (NEC 2017)
NFPA 101 Life Safety Code—2015 Edition;
Standard for Residential Constr uction in High-Wind Regions ICC 600—2008
Edition;
Accessible and Usable Buildings and Facilities ICC A117.1—2009 Edition.
2. Accessory structure exemption wording is removed within the IBC and the
IRC and replaced with the following language:
One-story detached accessory structures used as tool and storage sheds,
playhouses, and similar uses, provide d the floor area does not exceed 225
square feet are exempt from permits.
B. Within said codes, when reference is made to the duties of a certain official
named therein, that designated official of Colleton County, shall be responsible
for enforcing the provisions of said code(s).
C. Areas not affected. This chapter shall no t affect any incorporated areas of the
County of Colleton, unless an intergovernmental agr eement exists between the
County and the incorporated area, nor any parcel of land owned by the State of
South Carolina or the federal government, or any buildings or installations placed
thereon.
D. Areas affected. Except for those porti ons of land excluded under subsection C
above, this chapter shall cover all unincorporated portions of Colleton County.
E. Contractor's licenses required. Every co ntractor or builder who shall make
contracts for the construction or repair of buildings for whic h a county permit is
required, and/or subletting the same or a ny part thereof, shall be required to
secure a license from Colleton County. Applicants desiring to be licensed with the
county as a general, residentia l, or mechanical contractor must file an application
with the planning and development department, accompanied by the current
license fee, and show proof of licensure by the State of South Carolina.
F. Building code fees. Fees as establis hed and updated peri odically by county
council, usually in the annua l budget ordinance, shall apply as set forth in such
ordinance.
G. Violation of the construction codes as adopted by Colleton County is punishable
by a $500.00 fine and/or up to 30 days in jail. Performing c onstruction activities
that require a Building, Zoning, or othe r required Permit, before acquiring the
appropriate Permit(s), shall be punishable by a Double Permit Fee for each Permit
required. Each day’s violation of any of provisions of these codes shall constitute
a new and separate offense.
2. Title 13 – Buildings and Construction, Ch apter 13.12 – Flood Damage Prevention, of
the Colleton County Code of Laws (the same be ing inclusive of and one with the Originating
and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality
to read as follows:
CHAPTER 13.12. - FLOOD DAMAGE PREVENTION
ARTICLE 13.12-1. - GENERAL PROVISIONS
Sections:
13.12-1.010. - Statutory authorization.
13.12-1.020. - Findings of fact.
13.12-1.030. - Statement of purpose and objectives.
13.12-1.040. - Lands to which this chapter applies.
13.12-1.050. - Permit required.
13.12-1.060. - Compliance.
13.12-1.070. – Interpretation.
13.12-1.080. - Partial invalidity and severability.
13.12-1.090. – Warning and Disclaimer of Liability.
13.12-1.100. – Penalty.
13.12-1.010. - Statutory authorization.
The Legislature of the State of South Carolin a has in S.C. Code 1976, title 4, chapters 9
(article 1), 25, and 27, and amendments theret o, delegated the responsibility to local
governmental units to adopt regulations desi gned to promote the public health, safety,
and general welfare of its re sidents. Therefore, the Co lleton County council (governing
body) of Colleton County, Walterboro, South Carolina, does ordain as follows.
13.12-1.020. - Findings of fact.
The special flood hazard areas (SFHAs) of Colleton County are subject to periodic
inundation which results in loss of life and property; health and safety hazards; disruption
of commerce and governmental services; ex traordinary public expenditures of flood
protection and relief, and impairment of the tax base, all of which adversely affect the
public health, safety, and general welfare.
Furthermore, these flood losses are caused by the cumulative effect of obstructions in
floodplains causing increases in flood height s and velocities, and by the occupancy in
SFHAs by uses vulnerable to floods or hazardou s to other lands which are inadequately
elevated, floodproofed, or otherwise unprotected from flood damages.
13.12-1.030. - Statement of purpose and objectives.
A. It is the purpose of this chapter to prom ote the public health, safety, and general
welfare and to minimize public/private lo sses due to flood conditions in specific
areas by provisions designed to:
1. Restrict or prohibit uses which are dange rous to health, safety, and property
due to water or erosion hazards, or which result in damaging increases in
erosion or in flood heights or velocities;
2. Require that uses vulnerable to floods, including facilities which serve such
uses, be protected against flood damage at the time of initial construction;
3. Control the alteration of natural floodpl ains, stream channels, and natural
protective barriers which are involved in the accommodation of flood waters;
4. Control filling, grading, dredging, and other development which may increase
erosion or flood damage; and
5. Prevent or regulate the construction of flood barriers which will unnaturally
divert flood waters or which may increase flood hazards to other lands.
B. The objectives of this chapter are:
1. To protect human life, health, and public and private property;
2. To minimize expenditure of public m oney for costly flood control projects;
rescue and relief efforts; prolonged bus iness interruptions; damage to public
facilities and utilities such as water and gas mains, electric, telephone, and
sewer lines; and streets and bridges located in floodplains;
3. To help maintain a stable tax base providing for the sound use and
development of flood prone areas in such a manner as to minimize future
flood blight areas; and
4. To insure that potential home buyers are notified that property is in a special
flood hazard area (SFHA).
13.12-1.040. - Lands to which this chapter applies.
This chapter shall apply to all SFHAs with in the jurisdiction of Colleton County as
identified by the Federal Emergency Ma nagement Agency (FEMA) in its Flood
Insurance Study (FIS), dated December 21, 2017, with accompanying maps and other
supporting data that are hereby adopted by reference and declar ed to be a part of this
chapter. Upon annexation any SFHAs identifie d by FEMA in its Flood Insurance Study
for the unincorporated areas of Colleton C ounty, with accompanying map and other data
are adopted by reference and declared part of this chapter.
13.12-1.050. - Permit required.
A building or zoning permit shall be required to be in conformance with the provisions of
this chapter prior to the commencement of any development activities.
13.12-1.060. - Compliance.
No structure or land shall hereafter be located, extended, converted, or structurally altered
without full compliance with the terms of this chapter and other applicable regulations.
13.12-1.070. - Interpretation.
In the interpretation and application of this ch apter all provisions shall be considered as
minimum requirements, liberally construed in favor of the governing body, and deemed
neither to limit nor repeal any other powers gr anted under state law. This chapter is not
intended to repeal, abrogate, or impair a ny existing easements, covenants, or deed
restrictions. However, where this chapter and another conflict or overlap, whichever
imposes the more stringent restrictions shall prevail.
13.12-1.080. - Partial invalidity and severability.
If any part of this chapter is declared invalid, the remainde r of the chapter shall not be
affected and shall remain in force.
13.12-1.090. - Warning and disclaimer of liability.
The degree of flood protection required by this chapter is considered reasonable for
regulatory purposes and is based on scientif ic and engineering consideration. Larger
floods can and will occur on rare occasions. Flood heights may be increased by man-
made or natural causes. This chapter does not imply that land outside the SFHAs or uses
permitted within such areas will be free from flooding or flood damages. This chapter
shall not create liabil ity on the part of Colleton Count y or by any officer or employee
thereof for any flood damages that result from reliance on this chapter or any
administrative decision lawfully made hereunder.
13.12-1.100. – Penalty.
Any person violating or failing to comply with the provisions of this Chapter shall be
deemed guilty of a misdemeanor and upon conviction shall be fined not more than
$500.00 or imprisoned for not more than 30 days for each such violation. Each day on
noncompliance with the provisions of this Chapter shall constitute a separate offense.
ARTICLE 13.12-2. - DEFINITIONS
Sections:
13.12-2.010. - General.
13.12-2.020. - Definitions.
13.12-2.010. - General.
Unless specifically defined below, words or phrases used in this chapter shall be
interpreted so as to give them the meaning they have in common usage and to give this
chapter it’s most reasonable application.
13.12-2.020. - Definitions.
Accessory structure (appurtenant structure) means structures that are located on the same
lot as the principal structure and the use of wh ich is incidental to the use of the principal
structure; used for parking or storage only; walled and r oofed; and small (less than 600
sq. ft. in A and AE flood zones and less th an 100 sq. ft. in V and VE flood zones).
Accessory structures should constitute a mi nimal investment, may not be used for human
habitation, and be designed to have mini mal flood damage potential. Examples of
accessory structures are detached garages, carp orts, storage sheds, tool sheds, and small
boathouses.
Addition (to an existing building) means an extens ion or increase in the floor area and/or
height of a building or stru cture and which shall comply with the requirements for new
construction regardless as to whether the a ddition is a substantial improvement or not.
Where a firewall or load-bearing wall is prov ided between the addition and the existing
building, the addition shall be considered a separate building, and must comply with the
standards for new construction.
Agricultural structure (aquaculture structure farmi ng conducted in water) means a
structure used solely for agricultural purposes in which the use is exclusively in
connection with the production, harvesting, stor age, drying, or raising of agricultural
commodities, including the raising of livestock. Agricultural structures are considered
“walled and roofed” when the structure incl udes at least two outside rigid walls and a
fully secured roof. Structures used for hu man habitation; employment or entertainment;
multiple or mixed purposes, do not satisfy th e “exclusive use” requirement. Agricultural
structures are not exempt from the provisions of this chapter.
Appeal means a request for a review of th e floodplain administrator's or CFM’s
interpretation of any provision of this chapter.
Area of shallow flooding means a designated AO or VO zone on a community's FIRM
with base flood depths of one to three feet where a clearly defined channel does not exist,
where the path of flooding is unpredictable an d indeterminate, and where velocity flow
may be evident.
Area of special flood hazard (SFHA) means the land in th e floodplain within a
community subject to a one percent or greate r chance of being equaled or exceeded in
any given year.
Base flood; Base Flood Elevation (BFE) means the flood having a one percent chance
of being equaled or exceeded in any given ye ar. BFE is the computed elevation to which
floodwater is anticipated to rise during the Base Flood.
Basement means any enclosed area of a building that is below grade on all sides.
Building means any structure built for support, shelter, or enclosure for any occupancy or
storage.
Breakaway wall is a wall that is not part of the st ructural support of a building that is
intended through its design and construction to collapse under spec ific lateral loading
forces without causing damage to the elevat ed portion of the building or the supporting
foundation systems.
CFM is a Certified Flood Manager.
Coastal high hazard area means a SFHA extending from offshore to the inland limit of
the primary frontal dune along an open coast an d any other area subject to velocity wave
action from storms or seismic sources.
Critical development means development critical to th e community's public health and
safety, is essential to the orderly functioni ng of a community, it stores and/or produces
highly volatile, toxic, or wa ter-reactive materials, or it houses occupants that may be
insufficiently mobile to avoid loss of life or injury. Examples of critical developments
include jails, hospitals, schools, fire stat ions, nursing homes, wa stewater treatment
facilities, water plants, and gas/oil/propane storage facilities.
Design Flood Elevation (DFE) is the base flood elevation (BFE) plus freeboard of three
(3) feet.
Development means any man-made change to im proved or unimproved real estate,
including, but not limited to, buildings or other structures, mining, dredging, filling,
grading, paving, excavation or drilling operations, or storage of equipment or materials.
Development includes the following; any change in the intensity of use of the land;
previous man-made wetland or of any natura l resource area; agriculture and forestry
operations.
Elevated building means a non-basement building constr ucted to have the lowest floor
elevated above the ground level by means of fill, solid foundation perimeter walls,
pilings, columns, piers, or shear walls parallel to the flow of water.
Enclosure, (enclosed space or area) means any space below the BFE and enclosed on all
sides by walls or partitions. A V-zone bu ilding elevated on an open foundation without
an enclosure or other obstructi ons below the BFE, is said to be free-of-obstruction, such
that the space below the BF E is surrounded by insect sc reening, louvered slats (wooden
or plastic lattice, slats, or shutters are permi ssible if at least 40 percent of their area is
open and that lattice can be no thicker than ½ inch, or that slats a nd shutters can be no
thicker than one inch), or open wood lattice.
Executive Order 11988 (Floodplain Management) . Issued by Presiden t Carter in 1977,
this order requires that no fe derally assisted activities be conducted in or have the
potential to affect identified SFHAs, unless there are no feasible alternatives.
Existing construction means, for the purposes of determ ining rates, structures for which
the start of construction commenced before April 14, 1987.
Existing manufactured home park or subdivision means an existing manufactured home
park or subdivision that was completed before April 7, 1987.
Expansion to an existing manufac tured home park or subdivision means adding more
spaces to, and enlarging the park or subdivision which includes roads and utilities.
FEMA is the Federal Emergency Management Agency.
Flood means a general and temporary condition of partial or complete inundation of
normally dry land areas from the overflow of inland or tidal waters, or the unusual and
rapid accumulation of runoff of surface waters from any source.
Flood hazard boundary map (FHBM) means an official map of a community, issued by
FEMA, where the boundaries of the SFHAs have been defined as Zone A.
Flood insurance rate map (FIRM) means an official map of a community, on which
FEMA has delineated both the SFHAs and th e risk premium zones applicable to the
community.
Flood insurance study (FIS) means the official report provided by FEMA which
contains flood profiles, as well as th e flood boundary floodway map and the water
surface elevation of the base flood.
Floodplain & Flood Prone Area means any land area susceptible to being inundated by
water from any source.
Floodplain management is the operation of an overa ll program of corrective and
preventative measures for reducing fl ood damage with floodplain management
regulations.
Floodplain management regulations is such federal, state, and local regulations, which
provide standards for the purpose of flood damage prevention and reduction.
Flood-resistant material means any building material capable of withstanding direct and
prolonged contact (minimum 72 hours) with floodwaters without sustaining damage that
requires more than low-cost cosmetic repair. Please refer to Technical Bulletin 2, current
edition, Flood-Resistant Materi als for Buildings Located in SFHAs in Accordance with
the NFIP document number FIA-TB-2, current edition, and available from FEMA. Class
4 and 5 materials, referenced therein, are acceptable flood-resistant materials.
Floodway means the channel of a river or othe r watercourse and the adjacent land areas
that must be reserved in order to di scharge the base flood without cumulatively
increasing the water surface elevation more than one foot.
Flood Zones – Special Flood Hazard Areas
"A"-zone. Areas subject to inundati on by the one-percent-annual-chance flood
event. Because detailed hydraulic analys es have not been performed, no base
flood elevations (BFEs) or flood depths are shown.
"AE" zone. Areas subject to inundati on by the one-percent-annual-chance flood
event determined by detailed methods. BFEs are shown within these zones.
"VE" zone. High risk areas subject to inundation by at least a one-percent-annual-
chance flood event as determined by de tailed methods, and where wave action is
expected with wave heights of more than 3.0 feet. BFEs or base flood depths are
shown within these zones.
"X" zone (shaded). Moderate risk areas within the 0.2-percent-annual-chance
floodplain, areas of one-percent-annual-chance flooding where the average depths
are less than one foot. No BFEs or base flood depths are shown within these
zones.
"X" zone (unshaded). Minimal risk areas outside the one-percent and 0.2-percent-
annual-chance floodplains. No BFEs or base flood depths are shown within these
zones.
Freeboard means a factor of safety usually expressed in feet above the established (BFE)
for purposes of floodplain management. "Freeb oard" tends to compensate for the many
unknown factors that could contribute to flood he ights greater than th e height calculated
for a selected size flood and floodway conditions , such as wave action, bridge openings,
and the hydrological effect of urbanization of the watershed.
Functionally dependent facility means a facility which cannot be used for its intended
purpose unless it is located or carried out in cl ose proximity to water, such as a docking
or port facility necessary for the load ing and unloading of cargo or passengers,
shipbuilding, ship repair, or seafood processing facilities. The term does not include long-
term storage, manufacture, sales, or service facilities.
Highest adjacent grade (HAG) means the highest natura l elevation of the ground
surface, prior to construction, next to the proposed walls of the structure.
Historic structure means any structure that is:
A. Listed individually in the National Register of Historic Places (a listing maintained by
the U.S. Department of the Interior ( DOI)) or preliminarily determined by the
Secretary of the Interior as meeting the requirements for individual listing on the
National Register;
B. Certified or preliminarily determined by the Secretary of the Inte rior as contributing
to the historical significance of a registered historic district or a district preliminarily
determined by the secretary to qualify as a registered historic district;
C. Individually listed on a state inventory of historic places;
D. Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified:
1. By an approved state program as determined by the Secretary of Interior; or
2. Directly by the Secretary of Interior in states without approv ed programs. Some
structures/districts listed on the state or local inventories may not be "historic" as
cited above, but have been included on the i nventories since it is believed that the
structures or districts have the potential for meeting the "historic" structure criteria
of the DOI. In order for these structures to meet NFIP historic structure criteria, it
must be demonstrated a nd evidenced that the Sout h Carolina Department of
Archives and History has individually dete rmined the structure or district meets
DOI historic structure criteria.
Increased cost of compliance (ICC) . Applies to all new and renewed flood insurance
policies effective on and after June 1, 1997. The NFIP shall enab le the purchase of
insurance to cover the cost of compliance wi th land use and control measures established
under section 1361. It provides coverage for paym ent of a claim to help pay the cost to
comply with State or community floodplain management laws or ordinances after a flood
in which a building has been declared substantially or repetitively damaged.
Limited storage means an area used for storage and in tended to be limited to incidental
items that can withstand exposure to the el ements and have low flood damage potential.
Such an area must be of flood resistant or br eakaway material, void of utilities except for
essential lighting and cannot be temperature controlled. If th e area is located below the
BFE in an A, AE and A1-A30 zone it must meet the requirements of section 13.12-
4.010(E) of this chapte r. If the area is located below the BFE in a V, VE and V1-V30
zone it must meet the requirements of section 13.12-4.060.
Lowest adjacent grade (LAG) is an elevation of the lowe st ground surface that touches
any of the exterior walls of a building or proposed building walls.
Lowest floor means the lowest floor of the lowest enclosed area. Any unfinished or flood
resistant enclosure, usable solely for parking of vehicles, building access, or storage in an
area other than a basement area is not consid ered a building's lowest floor provided that
such an enclosure is not built so as to render the structure in violation of other provisions
of this chapter.
Manufactured/mobile home means a structure designed to be a dwelling unit that is
transportable in one or more sections, built on a permanent chassis, and designed to be
used with or without a permanent foundation when connected to the required utilities.
The term "manufactured/mobile home" does no t include a recreational vehicles, travel
trailers or motorized homes registered for travel on highways, nor modular buildings.
Manufactured home park or subdivision means a parcel (or contiguous parcels) of land
divided into two or more ma nufactured home lots for rent or sale. The term does not
include the premises where unoccupied manuf actured homes, whether new or used, are
parked for the purpose of inspection, sale, storage or repair, or recreational vehicle parks.
Mean sea level means for the purposes of th is chapter, the National Geodetic Vertical
Datum (NGVD) of 1929, North American Ve rtical Datum (NAVD) of 1988, or other
datum, to which the BFEs listed is shown on a community's FIRM.
National Geodetic Vertical Datum (NGVD) means, as corrected in 1929, elevation
reference points set by National Geodetic Survey based on mean sea level.
North American Vertical Datum (NAVD) means the North American Vertical Datum
(NAVD) Vertical control, as corrected in 1988, used as the reference datum on the FIRM.
New construction means a structure for which the st art of construction commenced after
April 7, 1987. The term also includes any subsequent improvements to such structure.
New manufactured home park or subdivision means a manufactured home park or
subdivision where construction was completed on or after April 7, 1987.
Pre-Development is the conditions that existed prior to land disturbance or
redevelopment activity at the time of the application.
Primary frontal dune means a continuous or nearly co ntinuous mound or ridge of sand
with relatively steep seaward and landward slopes immediately landward and subject to
erosion and overtopping from high tides a nd waves during coastal storms. The inland
limit of the primary frontal dune occurs at the point where there is a distinct change from
a relatively steep slope to a relatively mild slope.
Recreational vehicle means a vehicle which is: built on a single chassis; 400 square feet
or less when measured at the largest horizon tal projection; designed to be self-propelled
or permanently towable by a light-duty truck; and, designed primarily not for use as a
permanent dwelling, but as temporary living quarters for recreational, camping, travel, or
seasonal use.
Repetitive loss means a building covered by a cont ract for flood insurance that has
incurred flood-related damages on two occasions during a ten-year period ending on the
date of the event for which a second claim is made, in which the cost of repairing the
flood damage, on the average, equaled or excee ded 25 percent of the market value of the
building at the time of each such flood event.
Section 1316 of the National Flood Insurance Act of 1968. The act provides that no new
flood insurance shall be provided for any property found by FEMA to have been declared
by a state or local authority to be in violation of state or local ordinances.
Severe repetitive loss (SRL) property is flood-related damage property that has at least
four claims for buildings and/or contents exceeding $5,000 or at least two building-only
payments that cumulatively exceeds the market value of the building.
Stable natural vegetation. The first place on the waterfront where plants such as sea oats
hold sand in place.
Start of construction (for other than new construction or substantial improvements
under the Coastal Barrier Resources Act (P.L. 97-348)), includes substantial
improvement, and means the date the buildi ng permit was issued, pr ovided the actual
start of construction was within 180 days of the permit issue date. The actual start means
the first placement of permanent constructi on of a structure (inc luding a manufactured
home) on a site, such as the pouring of slabs or footings, installation of piles, construction
of columns, or any work beyond the stag e of excavation or the placement of a
manufactured home on a foundation. Perm anent construction does not include the
following: land preparation; clearing, grad ing, and filling; nor does it include the
installation of streets and/or walkways; excavation for f ootings, piers or foundations, or
the erection of temporary forms; the installa tion of accessory buildings, such as garages
or sheds. For a substantial improvement, the actual start of construction means the first
alteration of any wall, ceiling, floor, or other structural part of the building, whether or
not that alteration affects the external dimensions of the building.
Structure means a walled and roofed building, a manufactured/mobile home, including a
gas or liquid storage tank, or other man-made f acility or infrastructure that is principally
above ground.
Substantial damage means damage of any origin sustained by a structure whereby the
cost of restoring the structur e to its before-damaged conditio n would equal or exceed 49
percent of the market value of the structur e before the damage occurred. Such repairs
may be undertaken successively and their cost s counted cumulatively. Please refer to the
definition of "substantial improvement."
Substantial improvement means any repair, reconstructio n, rehabilitation, addition, or
other improvement of a structur e, the cost of which equals or exceeds 49 percent of the
market value of the structure before the st art of construction of the improvement. This
term includes structures that have incurred substantial damage, regardless of the actual
repair work performed. The term does not, however, include either:
1. Any project of improvement to a structure to correct existing violations of state or
local health, sanitary, or safety code sp ecifications which have been identified by
the local code enforcement official and which are the minimum necessary to
assure safe living conditions (does not in clude American with Disabilities Act
compliance standards); or
2. Any alteration of a historic structure, provided that the alteration will not preclude
the structure's continued designation as a historic structure;
3. Permits shall be cumulative for a period of eight years. If the improvement project
is conducted in phases, the total of all co sts associated with each phase, beginning
with the issuance of the first permit, shall be utilized to determine whether
"substantial improvement" will occur.
Substantially improved existing manuf actured home park or subdivision means, where
the repair, reconstruction, rehabilitation or im provement of the street s, utilities and pads
equals or exceeds 49 percent of the value of the streets, utilities and pads before the
repair, reconstruction, or improvement commenced.
Variance means a grant of relief from the require ments of this chapter as provided under
the provisions of sections 13.12-5.030 Historic Structures and 13.12-5-050 Agricultural
Structures only.
Violation means the failure of a structure or other development to be fully compliant with
these regulations.
Watersheds is a land area that channels rainfall and snowmelt to creeks, streams, and
rivers, and eventually to outflow points su ch as reservoirs, ba ys, and the ocean. The
watershed consists of surface water--lakes, streams, reservoirs, and wetlands--and all the
underlying groundwater.
ARTICLE 13.12-3. - ADMINISTRATION
Sections:
13.12-3.010. - Designation of floodplain administrator.
13.12-3.020. - Adoption of letter of map revisions (LOMR).
13.12-3.030. – Reserved.
13.12-3.040. - Permitting and certification requirements.
13.12-3.050. – Duties and Responsibilities of the floodplain administrator and
Certified Floodplain Manager.
13.12-3.060. – Administrative Procedures
13.12-3.010. - Designation of floodplain administrator.
The planning and development director (direct or), the floodplain admi nistrator, Certified
Floodplain Manager (CFM) or director’s designee are hereby appointed to administer and
implement the provisions of the ordinance codified in this chapter.
13.12-3.020. - Adoption of letter of map revisions (LOMR).
Adopt all LOMRs that are issued in the areas identified in section 13.12-1.040.
13.12-3.040. - Permitting and certification requirements.
A. Building/zoning permit applications shall be made to the floodplain administrator on
appropriate forms prior to any developmen t activities. The permit application shall
include, but not be limited to, two sets of plans drawn to scale showing: the nature,
location, dimensions, and elevations of th e area in question; existing or proposed
structures; and the location of fill material s, storage areas, and drainage facilities.
Specifically, the following information is required:
1. A plot plan that shows the 100-year fl oodplain contour or a statement that the
entire lot is within the floodplain must be provided by the permit applicant when
the lot is within or appears to be within the floodplain as mapped by FEMA or the
floodplain identified pursuant to either subsection 13.12-3.050(K) or sections
13.12-4.030 and 13.12-4.040. The plot plan must be prepared by or under the
direct supervision of a registered land surveyor or professional engineer and
certified by same.
2. Where BFE data is provided as set forth in section 13.12-1.040 or subsection
13.12-3.050(K), the application for a permit within the SFHA shall show:
a) The elevation (in relation to mean sea le vel) of the lowest floor of all new and
substantially improved structures; and
b) If the structure will be floodproofed in accordance w ith subsection 13.12-
4.020(B) requirements of the elevation (in relation to mean sea level) to which
the structure will be floodproofed.
3. Where BFE data is not provided. If no BFE data is provided as set forth in section
13.12-1.040 or subsection 13.12-3.050(K), then the provisions of section 13.12-
4.040 must be met.
4. Alteration of watercourse. Where any watercourse will be altered or relocated as a
result of proposed development, the permit application shall include: a
description of the extent of watercourse alteration or relocati on; an engineering
report on the effects of the proposed project on the flood- carrying capacity of the
watercourse and the effects to properti es located both upstream and downstream;
and, a map showing the location of the proposed watercourse alteration or
relocation.
B. Certifications.
1. Floodproofing certification. When a structur e is floodproofed, th e applicant shall
provide certification from a registered, prof essional engineer that the nonresidential,
floodproofed structure meets the floodproofing criteria in the non-residential
construction requirements of subsection 13.12-4.020(B).
2. Elevation Certification (EC). Each EC submission must pass inspection in order to
proceed to the next phase of the project.
a) Before structural development. First cons truction drawing EC is submitted based
on the structural blueprints and detailed si te plans. This submission is required in
order to review the permit application.
b) During construction. A lowest floor elevation (building under construction EC) or
floodproofing certification is required after the lowest floor is completed. As soon
as possible after completion of the lowest floor and before any further vertical
construction commences, or floodproofi ng by whatever construction means,
whichever is applicable, it shall be the dut y of the permit holder to submit to the
floodplain administrator a cert ification of the elevation of the lowest floor, or
floodproofed elevation, whichever is applicab le, as built, in relation to mean sea
level. Said certification shall be prepared by or under the direct supervision of a
registered land surveyor or professi onal engineer. Any wo rk done prior to
submission of the certificati on shall be at the permit holder's risk. The floodplain
administrator shall review the floor elev ation survey data submitted. The permit
holder immediately and prior to further progressive work being permitted to
proceed shall correct deficiencies detect ed by such review. Failure to submit the
survey or failure to make said corrections required hereby shall be cause to issue a
stop work order for the project.
c) Final grading and completed structure. The final EC should be completed after
final grading is completed and before the call to inspect to get a CO and request
for permanent power.
3. V-Zone certification. When a structure is located in zones V, VE, or V1-30,
certification shall be provided from a regist ered professional engi neer, separate from
submitted plans, that new construction and substantial improvement meets the criteria
for the coastal high hazard areas outli ned in section 13.12-4.060, Coastal High
Hazard Areas (V-Zones).
4. As-built certification. Upon completion of th e development a registered professional
engineer, or land surveyor, in accordance w ith SC law, shall certify according to the
requirements of subsections 13.12-3.040(B)(1), (B)(2), and (B)(3) of this section that
the development is built in accordance w ith the submitted plans and previous pre-
development certifications.
13.12-3.050. - Duties and responsibilities of the floodplain administrator and
Certified Floodplain Manager (CFM).
Duties of the floodplain administrator and CFM shall include, but not be limited to:
A. Permit review. Review all building and zoning permits located within a SFHA to
assure that the requirements of this chapter have been satisfied.
B. Requirement of federal and/or state permits . Advise permittee that additional federal
or state permits may be required, and if sp ecific federal or state permits are known,
require that copies of such permits be pr ovided and maintained on file with the
building permit.
C. Watercourse alterations.
1. Notify adjacent communities and the South Carolina Department of Natural
Resources (SCDNR), Land Resources and Conservation Districts Division, State
Coordinator for the NFIP, prior to any al teration or relocati on of a watercourse,
and submit evidence of such notification to FEMA
2. In addition to the notifications require d, watercourse alterations per subsection
13.12-3.050(C)(1), written reports of maintena nce records must be maintained to
show that maintenance has been provided within the altered or relocated portion
of said watercourse so that the flood-car rying capacity is not diminished. This
maintenance must consist of a comprehe nsive program of periodic inspections,
and routine channel clearing and dre dging, or other related functions. The
assurance shall consist of a description of maintenance activi ties, frequency of
performance, and the local official re sponsible for maintenance performance.
Records shall be kept on file for FEMA inspection.
3. If the proposed project will impact the configuration of the watercourse,
floodway, or BFE for which a detailed fl ood insurance study has been developed,
the applicant shall apply for and must r eceive approval for a c onditional letter of
map revision (CLOMR) with FEMA prior to the start of actual construction.
4. Within 60 days of completion of an altera tion of a watercourse, referenced in the
certification requirements of subsecti on 13.12-3.040(B)(4), the applicant shall
submit as-built certification, by a registered professional engineer, to FEMA.
D. Floodway encroachments. Prevent encr oachments within floodways unless the
certification and flood hazard reduction pr ovisions of subsection 13.12-4.020(E) are
met.
E. Adjoining floodplains. Cooperate with neighb oring communities with respect to the
management of adjoining floodplains and/or flood-related erosion areas in order to
prevent aggravation of existing hazards.
F. Notifying adjacent communities. Notify adjacent communities prior to permitting
substantial commercial developments and large subdivisions to be undertaken in
SFHAs and/or flood-related erosion hazards.
G. Certification requirements.
1. Obtain and review actual el evation (in relation to mean sea level) of the lowest
floor of all new or substantially im proved structures, in accordance with
administrative procedures outlined in subsection 13.12-3.040(B)(2) or the coastal
high hazard area requirements outlined in subsection 13.12-4.060(E).
2. Obtain the actual elevation (in relation to mean sea level) to which the new or
substantially improved structures have b een floodproofed, in accordance with the
floodproofing certification outlined in subsection 13.12-3.040(B)(1).
3. When floodproofing is utilized for a particular structure, obtain certifications from
a registered professional engineer in accordance with the nonresidential
construction requirements outlined in subsection 13.12-4.020(B).
4. A registered professional e ngineer shall certify that th e design, specifications and
plans for construction are in compliance with the provisions contained in the
coastal high hazard area requirements outlined in subsections 13.12-4.060(D), (F)
and (H) of this chapter.
H. Map interpretation. Where interpretation is needed as to th e exact location of
boundaries of the SFHA (for example, where there appears to be a conflict between a
mapped boundary and actual field condition s), the floodplain administrator shall
make the necessary interpretation. The person contesting the location of the boundary
shall be given a reasonable opportunity to appeal the interpreta tion as provided in
subsection 13.12-3.050(L).
I. Prevailing authority. Where a map boundary showing an SFHA and field elevations
disagree, the BFEs for flood protection elev ations (as found on an elevation profile,
floodway data table, etc.) shall prevail. The correct information should be submitted
to FEMA as per the map maintenance act ivity requirements outlined in subsection
13.12-4.020(G).
J. Use of best available data. When BFE data or floodway data has not been provided in
accordance with section 13.12-1.040, obtain, re view, and reasonably utilize best
available BFE and floodway data available from a federal, state, or other source,
including data developed pursuant to the standards for subdivision proposals outlined
in section 13.12-4.040 in order to administer th e provisions of this chapter. Data from
preliminary, draft, and final flood insurance studies constitutes best available data
from a federal, state, or other source. Da ta must be developed using hydraulic models
meeting the minimum requirement of NFIP a pproved model. If an appeal is pending
on the study in accordance with 44 CFR ch. 1, parts 67.5 and 67.6, the data does not
have to be used.
K. Special flood hazard area/topographic boundaries conflict. When the exact location of
boundaries of the SFHAs conflict with the cu rrent, natural topography information at
the site the property owner may apply and be approved for a letter of map amendment
(LOMA) by FEMA. The floodplain administrato r in the permit file will maintain a
copy of the LOMA issued from FEMA.
L. On-site inspections. Make on-site inspect ions of projects in accordance with the
administrative procedures outlined in subsection 13.12-3.060(D).
M. Administrative notices. Serv e notices of violations, issue stop work orders, revoke
permits and take corrective actions in accord ance with the administrative procedures
in section 13.12-3.060.
N. Records maintenance. Maintain all records pertaining to the administration of this
chapter and make these records available for public inspection.
O. Annexations and detachments. Notify the South Carolina Department of Natural
Resources (SCDNR) Land, Water and Conser vation Division, within six months, of
any annexations or detachments that include SFHAs.
P. Federally funded development. The President issued Executive Order 11988,
Floodplain Management May 1977. E.O. 11988 di rects federal agencies to assert a
leadership role in reducing flood losses and lo sses to environmental values served by
floodplains. Proposed developments must go through an eight-step review process.
Evidence of compliance with the executive order must be submitted as part of the
permit review process.
Q. Substantial damage determination. Perform an assessment of damage from any origin
to the structure using FEMA’s Residentia l Substantial Damage Estimator (RSDE)
software or another approved method (SCD NR Application) to determine if the
damage equals or exceeds 50 percent of the market value of the structure before the
damage occurred.
R. Substantial improvement determinations. Perform an assessment of permit
applications for improvements or repairs to be made which equals or exceeds 49
percent of the market value of the struct ure before the improvement or repair is
started. Cost of work counted for determining if and when substantial improvement to
a structure occurs shall be cumulative for a period of eight years. If the improvement
project is conducted in phases the total cost of all phases shall be used to determine
whether "substantial improvement" will occur.
S. Methods of market value determination. Mark et values shall be determined by one of
the following:
1. The current assessed building value determined by the county assessor's office; or
2. A certified appraisal from a registered pr ofessional licensed appraiser performed
in accordance with South Carolina laws, within the past six months. The appraisal
shall indicate actual replacement value of the building or structure in its pre-
improvement condition, less depreciation for functionality, obsolescence, and site
improvements; or
3. The Marshall and Swift Residential Cost Handbook may be used to determine
costs for buildings or structures; or
4. A real estate purchase contract within 06 months prior to the date of the
application for a permit.
13.12-3.060. - Administrative procedures.
A. Inspections of work in progress. As the work progresses, the floodplain administrator
shall make as many inspections of the work as needed to ensure the work is being
done according to code and the terms of th e permit. The floodplain administrator has
a right, upon presentation of pr oper credentials, to enter on any premises within the
county’s jurisdiction, at any r easonable hour, for the purpos es of inspection or other
enforcement action.
B. Stop-work orders. Whenever a building or part thereof is being constructed,
reconstructed, altered, or repair ed in violation of this ch apter, or without the proper
permits, the floodplain administrator may or der the work to be immediately stopped.
The stop-work order shall be in writing, di rected to the person doing the work, state
the specific work to be stopped, the specific reasons for the stoppage, and the
conditions under which the work may be re sumed. Violation of a stop-work order
constitutes a misdemeanor. If the stop-work-o rder is issued due to a lack of permits
being pulled for the work being performed, the violator shall be required to pay a
double permit fee for each permit needed befo re work can recommence. Failure to
pay the double permit fees before work recommences shall initiate a citation where a
court date will be assigned.
C. Revocation of permits. The floodplain admi nistrator may revoke and require the
return of the development permit by notifying the permit holder in writing, stating the
reason, such as: any substantial departure from the approved application, plans, or
specifications; refusal or failure to comply with state or local laws; or, for false
statements or misrepresentations made in securing the permit. Any permit mistakenly
issued in violation of an applicable state or local law may also be revoked.
D. Periodic inspections. The floodplain admini strator and other designated county
compliance officers shall have a right, upon presentation of proper credentials, to
enter on any premises within the county’s jurisdiction, at any re asonable hour for the
purposes of inspection or other enforcement action.
E. Violations to be corrected. When the fl oodplain administrator finds violations of
applicable state and local laws, it shall be their duty to notify the owner or occupant
of the building of the viol ation. The owner or occupant shall immediately remedy
each of the violations of law.
F. Actions in event of failure to take correct ive action. If the ow ner of a building or
property fails to take prompt corrective ac tion, the floodplain administrator shall give
him written notice, by certified or register ed mail to his last known address or by
personal service, that:
1. The building or property is in violation of this chapter and appropriate section;
2. A hearing will be held before the floodpl ain administrator at a designated place
and time, not later than ten days after the date of the notice, at which time the
owner shall be entitled to be heard in person or by counsel and to present
arguments and evidence pertaining to the matter; and
3. Following the hearing, the floodplain administ rator may issue such order to alter,
vacate, or demolish the building; or to remove fill as appears appropriate.
G. Order to take corrective action. If, upon a hearing held pursuant to the notice
prescribed above, the floodplain administrator finds the building or development is in
violation of this chapter, they shall make a written order to the owner, requiring them
to remedy the violation within a period of not less than 60 days, unless the floodplain
administrator finds that there is imminent danger to life or property, they may order
that violation be remedied immediately, or in less than 60 days, as may be feasible.
H. Appeal. Any owner who has received an or der to take corrective action may appeal
said order to the local elected governing body by giving written not ice of appeal to
the floodplain administrator and the cler k of council within ten days following
issuance of the order. In the event no app eal is made within 10 days, the order shall
be final. The local governing body shall hear an appeal within a reasonable time and
may affirm, modify and affirm, or revoke the order.
I. Failure to comply with order. If the owner fails to comply with an order of corrective
action, where no appeal was taken, or fails to comply with an order of the governing
body following an appeal, they shall be guilty of a misdemeanor and punished at the
discretion of the court.
J. Denial of flood insurance under the NFIP. If a structure remains in violation of this
chapter after all othe r penalties are exhausted to achieve compliance, then the
floodplain administrator shall notify FEMA to initiate a Section 1316 of the National
Flood insurance Act of 1968, finding that the vi olator refuses to bring the violation
into compliance with this ch apter. If a violation has been remedied, the floodplain
administrator shall notify FEMA and ask that the Section 1316 be rescinded.
ARTICLE 13.12-4. - PROVISIONS FOR FLOOD HAZARD REDUCTION
Sections:
13.12-4.010. - General standards.
13.12-4.020. - Specific standards.
13.12-4.030. – Standards for subdivision proposals.
13.12-4.040. – Standards for streams without established BFEs and/or
floodways.
13.12-4.050. – Standards for streams with established BFEs but without
floodways.
13.12-4.060. – Coastal high hazard areas (V-zones).
13.12-4.010. - General standards.
Development may not occur in the floodplain wh ere alternative locations exist due to the
inherent hazards and risks involved. Before a permit is issued, the applicant shall
demonstrate that new struct ures cannot be located out of the floodplain and that
encroachments into the floodplain are minimi zed. In all SFHAs the following provisions
shall apply:
A. Reasonably safe from flooding. Review all pe rmit applications to determine whether
proposed building sites will be reasonably safe from flooding.
B. Anchoring. All new construction and substant ial improvements shall be anchored to
prevent flotation, collapse, or lateral movement of the structure.
C. Flood resistant materials and equipment. All new construction and substantial
improvements shall be constructed with fl ood resistant materi als and use utility
equipment resistant to minimize flood damage in accordance with Technical Bulletin
2, current edition, Flood Damage Resistant Materials Requirements.
D. Minimize flood damage. All new construction and substantial improvements shall be
constructed by methods and practices that minimize flood damages.
E. Critical development. Shall be elevated to the 500-year flood elevation or the highest
known historical flood elevati on (where records exist), wh ichever is greater. If no
data exists establishing either of the a bove, the applicant sha ll provide a hydrologic
and hydraulic engineering analysis that generates 500-year flood elevation data.
F. Utilities. All new and replacem ent electrical, ventilati on, plumbing, heating and air
conditioning equipment (including ductwork) , and other service facilities shall be
designed and/or located so as to prevent water from entering or accumulating within
components during conditions of the base flood plus three feet . This requirement
does not preclude the installation of outdoor faucets for shower heads, sinks, hoses,
etc., as long as cut off devices and back flow devices are installed to prevent
contamination to the service components an d thereby minimize any flood damages to
the building. No utilities or components shall be attached to breakaway walls.
G. Water supply systems. All new and repl acement water supply systems shall be
designed to minimize or eliminate infiltration of floodwaters into the system.
H. Sanitary sewage systems. New and replacem ent sanitary sewage systems shall be
designed to minimize or elim inate infiltration of floodwat ers into the systems and
discharges from the systems into floodwaters. On-site waste disposal systems shall be
located and constructed to avoid impairment to them or contamination from them
during flooding.
I. Gas or liquid storage tanks. All gas or liquid storage ta nks, either located above
ground or buried, shall be an chored to prevent flotatio n and/or lateral movement
resulting from hydrodynamic and hydrostatic loads.
J. Alteration, repair, reconstruction, or improvements. Any alteration, repair,
reconstruction, or improvement to a structur e in compliance with this chapter, shall
also meet the requirements of "new constr uction" as contained in this chapter,
including post-FIRM development and structures.
K. Nonconforming buildings or uses. Nonconf orming buildings or uses may not be
enlarged, replaced, or rebuilt unless such enlargement or reconstruction is
accomplished in conformance with the provisi ons of this chapter. Provided, however,
nothing in this chapter shall prevent the re pair, reconstruction, or replacement of an
existing building or structure located to tally or partially within the floodway,
provided that the building or structure loca ted below the DFE in the floodway is not
increased or expanded.
L. American with Disabilities Act (ADA). A building is required to meet the specific
standards for floodplain construction outlined in section 13.12-4.020, and all
applicable ADA requirements. The ADA is not justification for issuing a variance or
otherwise waiving these requirements. Also , the cost of improvements required to
meet the ADA provisions shall be included in the costs of the improvements for
calculating substantial improvement.
13.12-4.020. - Specific standards.
In all SFHAs (zones A, AE, V, and VE) where the DFE (BFE plus freeboard) is three (3)
feet and the BFE data has been provided, as set forth in section 13.12-1.040 or outlined in
section 13.12-3.050 the following provisions are required:
A. Residential construction. New constructi on and substantial improvement of any
residential structure (incl uding manufactured homes) shal l have the lowest floor
elevated no lower than the DFE No base ments are permitted. Should solid foundation
perimeter walls be used to elevate a struct ure, openings sufficient to facilitate the
unimpeded movements of floodwaters sha ll be provided in a ccordance with the
elevated buildings requirements in subsection 13.12-4.020(D).
B. Nonresidential construction.
1. New construction and substantial improveme nt of any commercial, industrial, or
non-residential structure shall meet the same standards as residential construction.
Structures located in A-zones may be floodproofed in lieu of being elevated,
provided that all areas of th e structure below the require d elevation are watertight
with walls substantially impermeable to the passage of water, using structural
components having the capability of resisting hydrostatic and hydrodynamic loads
and the effect of buoyancy.
2. A registered, professional engineer shall certify that the standards of this
subsection are satisfied. Such certificati ons shall be provided to the floodplain
administrator as set forth in the fl oodproofing certification requirements in
subsection 13.12-3.040(B)(1). A variance may be considered for wet-
floodproofing agricultural structures in accordance with the criteria outlined in
section 13.12-5.040 if no other viable lo cation for the structure can be found.
Agricultural structures not meeting th e criteria of section 13.12-5.040 must meet
the nonresidential construction standards a nd all other applicable provisions of
this chapter. Structures that are floodproofed are re quired to have an approved
maintenance plan with an annual exer cise. The floodplain administrator must
approve the maintenance plan and receive notification of the annual exercises.
C. Manufactured homes.
1. Manufactured homes that are placed or substantially improved on sites
located: outside a manufact ured home park or subdivision; in a new
manufactured home park or sub-divisi on; in an expansion to an existing
manufactured home park or subdivision; or, in an existing manufactured home
park or subdivision must be elevated on a permanent foundation such that the
lowest floor of the manufactured home is elevated no lower than the DFE and
be securely anchored to an adequately anchored foundation system to resist
flotation, collapse, and lateral movement.
2. Manufactured homes must be anchored to resist flotation, collapse, and lateral
movement in accordance with Secti on 40-29-10 of the South Carolina
Manufactured Housing Board Regulati ons, as amended. Additionally, when
the elevation requirement would be met by an elev ation of the chassis 36
inches or less above the grade at the site, the chassis shall be supported by
reinforced piers or an engineered foundation. When the elevation of the
chassis is above 36 inches in height an engineering certification is required.
3. An evacuation plan must be developed for evacuation of a ll residents of all
new, substantially improved or subs tantially damaged manufactured home
parks or subdivisions located within flood-prone areas. This plan shall be filed
with and approved by the floodplain admi nistrator and the local emergency
preparedness coordinator.
D. Elevated buildings. New construction and substantial improvements of elevated
buildings that include fully enclosed areas that are usable solely for the parking of
vehicles, building access, or limited storag e in an area other than a basement, and
which are subject to flooding shall be de signed to preclude finished space and
automatically equalize hydrostatic flood for ces on exterior walls by allowing for
the entry and exit of floodwaters.
1. Designs for complying with this requirement must either be certified by a
professional engineer or architect or meet the following minimum criteria:
a) Provide a minimum of two openings on different walls having a total net
area of not less than one square inch for every square foot of enclosed area
subject to flooding;
b) The bottom of all openings shall be no higher than one foot above the
higher of the interior or exterior grade immediately under the opening;
c) Openings may be equipped with sc reens, louvers, valves, or other
coverings or devices provided they permit the automatic flow of
floodwaters in both directions; and
d) Fill placed around foundation walls must be graded so that the grade
inside the enclosed area is equal to or higher than the adjacent grade
outside the building on at least one side of the building.
e) Only the portions of openings that are below the BFE can be counted
towards the required net open area.
2. Hazardous velocities. Hydrodynamic pressu re must be considered in the
design of any foundation system where ve locity waters or the potential for
debris flow exists. If flood velocities ar e in excess of five feet per second or
greater, foundation systems other than solid foundations walls should be
considered so that obstructions to damaging flood flows are minimized.
3. Enclosures below BFE.
a) Access to the enclosed area shall be the minimum necessary to allow for
parking of vehicles (garage door) or limited storage of maintenance
equipment used in connection with th e premises (standard exterior door)
or entry to the living area (stairway or elevator).
b) The interior portion of such enclosed area shall not be partitioned or
finished into separate rooms, except to enclose a single storage area and
must be void of utilities except for essential lighting as required, and
cannot be temperature controlled.
c) One wet location switch and/or outlet connected to a ground fault interrupt
breaker may be installed below the required lowest floor elevation
specified in the specific standard s outlined in subsections 13.12-4.020(A),
(B) and (C) of this ordinance .
d) All construction materials below the required lowest floor elevation
specified in the specific standard s outlined in subsections 13.12-4.020(A),
(B) and (C) of this chapter should be of flood resistant materials.
E. Floodways. Located within SFHAs esta blished in section 13.12-1.040, are areas
designated as floodways. The floodway is an extremely hazardous area due to the
velocity of floodwaters that carry debris and potential projectiles and which could
potentially cause erosion. The following provisions shall apply within such areas:
1. No encroachments, including fill, new construction, substantial
improvements, additions, and/or other developments shall be permitted unless:
a) It has been demonstrated through hydrologic and hydraulic analyses
and/or No-Impact performed by a re gistered professional engineer
certifying that the proposed encroachment would not result in any increase
in the flood levels during the o ccurrence of the base flood. Such
certification and technical data sh all be presented to the floodplain
administrator; and/or,
b) A CLOMR has been approved by FEMA. A letter of map revision must be
obtained upon completion of the proposed development.
2. If subsection 13.12-4.020(E)(1), Floodways, is satisfied, then all shall comply
with all applicable flood hazard reduction provisions of article 13.12-4.
3. No manufactured homes shall be permitted, except in an existing
manufactured home park or subdivis ion. A replacement manufactured home
may be placed on a lot in an existing manufactured home park or subdivision
provided the anchoring and the elev ation standards of subsection 13.12-
4.020(C) are met.
4. Permissible uses within floodways ma y include general farming, pasture,
outdoor plant nurseries, horticulture, fore stry, wildlife sanctuary, game farm,
and other similar agricultural, wildlife, and related uses. Also, lawns, gardens,
play areas, picnic grounds, and hi king and horseback riding trails are
acceptable uses, provided that they do not employ structures or fill.
Substantial development of a permi ssible use may require a No-Impact
certification. The uses listed in this subsection are permissible only if and to
the extent that they do not cause a ny increase in BFEs or changes to the
floodway configuration.
F. Recreational vehicles, park model trailers and campers.
1. A recreational vehicle is ready for highway use if it is:
a) On wheels or jacking system;
b) Attached to the site only by quick-dis connect type utilities and security
devices; and
c) Has no permanently attached additions.
2. Recreational vehicles placed on sites shall either be:
a) On site for fewer than 90 consecutive days; and
b) Be registered with SCDMV and ready for highway use, or meet the permit
and certification requirements of section 13.12-3.040, general standards
outlined in section 13.12-4.010, and manufactured homes standards in
subsection 13.12-4.020(C).
G. Map maintenance activities. The NFIP re quires flood data to be reviewed and
approved by FEMA. This ensures that flood maps, studies and other data
identified in section 13.12-1.040 accurate ly represent flooding conditions so
appropriate floodplain management crite ria are based on current data, the
following map maintenance activities are identified:
1. Requirement to submit new technical data.
a) For all development proposals that im pact floodway delineations or BFEs,
the community shall ensure that techni cal data reflecting such changes be
submitted to FEMA within six months of the date such information
becomes available. These developm ent proposals include, but are not
limited to:
i. Floodway encroachments that increa se or decrease BFEs or alter
floodway boundaries;
ii. Fill sites to be used for the plac ement of proposed structures where
the applicant desires to remove the site from the SFHA;
iii. Alteration of watercourses that result in a relocation or elimination
of the SFHA, including the placement of culverts; and
iv. Subdivision or large scale, reside ntial or commercial development
proposals requiring the establishmen t of BFEs in accordance with
section 13.12-4.030.
b) It is the responsibility of the applican t to have technical data, required in
accordance with subsection 13.12-4.020(G), prepared in a format required
for a CLOMR or LOMR and submitted to FEMA. Submittal and
processing fees for these map revisions shall be the res ponsibility of the
applicant.
c) The floodplain administrator shall requi re a CLOMR prior to the issuance
of a permit for:
i. Proposed floodway encroachments that increase the BFE; and
ii. Proposed development which increases the BFE by more than one
foot in areas where FEMA has provided BFEs but no floodway.
d) Permits approved by the floodplain administrator shall be conditioned
upon the applicant obtaining a LOMR from FEMA for any development
proposal subject to subsection 13.12-4.020(G).
2. Right to submit new technical data. Th e floodplain administrator may request
changes to any of the information shown on an effective map that does not
impact floodplain or floodway delineati ons or BFEs, such as labeling or
planimetric details. Such a submissi on shall include appropriate supporting
documentation made in writing by the local jurisdiction and may be submitted
at any time.
H. Accessory structures.
1. A detached accessory structure, with a value in excess of $3,000.00, must
comply with the requirements of FEMA's Technical Bulletin 7, current
edition, Wet Floodproofing Requirements, or be elevated in accordance with
subsections 13.12-4.020(A) and (D), or be dry floodproofed in accordance
with subsection 13.12-4.020(B).
2. When accessory structures of $3,000.00 or less are placed in a SFHA, the
following additional criteria shall be met:
a) Accessory structures shall not be used for any type of human habitation
such as work, sleeping, living, cooking or having restroom facilities or
amenities;
b) Accessory structure shall not be larger than a one-story two –car garage,
approximately 600 sq. ft. in SFHAs ot her than coastal high hazard areas
(A and AE)
c) Accessory structure shall not be larger than 100 sq. ft. in coastal high
hazard areas (V and VE)
d) Accessory structures shall be desi gned, constructed, and placed on the
building site to: have low flood damage potential; offer the minimum
resistance to the flow of floodwaters; and be firmly anchored to prevent
flotation, collapse or lateral movement.
e) Service facilities such as electrical and heating equipment shall be
installed in accordance with subsection 13.12-4.010(F); and
f) Openings to relieve hydrostatic pres sure during a flood shall be provided
below BFE in conformance with subsection 13.12-4.020(D)(1).
g) Accessory structures shall be built with flood resistance materials in
accordance with technical Bulletin 2, Flood Damage-Resistant Materials
Requirements, current edition, and av ailable from FEMA Class 4 and 5
materials, referenced therein are acceptable.
3. Swimming pool utility equipm ent rooms. If the buildi ng cannot be built at or
above the DFE because of functionality of the equipment, then a structure to
house the pool equipment may be built below the DFE with the following
provisions:
a) Meet the requirements for accessory structures in subsection 13.12-4.020(H).
b) The utilities must be anchored to prev ent flotation and shall be designed to
prevent water from entering or accumulating within the components during
conditions of the base flood.
c) A variance may be granted to allow wet floodproofing of the structure.
4. Elevators.
a) Installing a float switch system or other system that provides the same level of
safety is necessary for all elevators wher e there is a potential for the elevator
cab to descend below the BFE during a flood per FEMA's Technical Bulletin
4(TB-4) Elevator Installation for Build ings Located in Special Flood Hazard
Areas, current edition.
b) All equipment that must be installed below the BFE such as counter weight
roller guides, compensation cable and pulleys, and oil buffers for traction
elevators and the jack assembly for a hydraulic elevator must be constructed
using flood-resistant materials where possible per FEMA's TB-4.
I. Fill. An applicant shall demonstrate thr ough a site plan drawn by a registered
professional engineer that fill is the only alternative to raising the building to meet
the residential and non-residential c onstruction requirements of subsections
13.12-4.020(A) and 13.12-4.020(B), and that th e amount of fill used will not
affect the flood storage capacity or adve rsely affect adjacent properties. The
following provisions shall apply to all fill placed in the SFHA:
1. Fill shall not be placed in the floodway unless it is in accordance with the
requirements in subsection 13.12-4.020(E)(1);
2. Fill shall not be placed in tidal or non-tidal wetlands without the required state
and federal permits;
3. Fill must consist of soil and rock materials only. A registered professional
geotechnical engineer may use dredged material as fill only upon certification
of suitability. Landfills, rubble fills, dumps, and sanitary fills are not permitted
in the floodplain;
4. Fill used to support structures must comply with ASTM Standard D-698, and
its suitability to support structures certified by a registered, professional
engineer;
5. Fill slopes shall not have a slope ratio greater or steeper than two horizontal to
one vertical, as designed by a registered professional engineer. Flatter slopes
may be required where velocities may result in erosion;
6. The use of fill shall not increase fl ooding or cause drainage problems on
neighboring properties;
7. Fill may not be used for structural s upport in the coastal high hazard areas;
and
8. The fill will meet the requirements of FEMA Technical Bulletin 10, current
edition, Ensuring That Structures Bu ilt On Fill In Or Near Special Flood
Hazard Areas Are Reasonably Safe From Flooding.
13.12-4.030. - Standards for subdivision proposals.
A. All subdivision proposals and other pr oposed new development shall be
consistent with the need to minimi ze flood damage and are subject to all
applicable standards in these regulations and in Title 14, Land Management,
Chapters 14.04 and 14.08 as applicable for subdivisions.
B. All subdivision and other proposed new de velopment proposals shall have public
utilities and facilities such as sewer, gas, electrical, and water systems located and
constructed to minimize flood damage.
C. All subdivision and other proposed new development proposals shall have
adequate drainage provided to reduce exposure to flood damage.
D. The applicant shall meet the requirement to submit technical data to FEMA in
subsection 13.12-4.020(G) when a hydrologic and hydraulic analysis is completed
that generates BFEs.
13.12-4.040. - Standards for streams without established BFEs and/or floodways.
Located within SFHAs (zones A and V) es tablished in section 13.12-1.040, are small
streams where no BFE data has been prov ided or where no fl oodways have been
identified. The following provisions apply within such areas:
A. In all SFHAs where BFE data is not available, the applicant shall provide a
hydrologic and hydraulic engineering anal ysis that generates BFEs for all
subdivision proposals and other proposed developments containing at least 50 lots
or five acres, whichever is less.
B. No encroachments, including fill, new c onstruction, substantial improvements or
new development shall be permitted within 100 feet of the stream bank unless
certification with supporting technical data by a register ed, professional engineer
is provided demonstrating that such encroachments shall not result in any increase
in flood levels during the occurrence of the base flood discharge.
C. If subsection 13.12-4.040(A) is satisfied a nd BFE data is available from other
sources, all new constructio n and substantial improveme nts within such areas
shall comply with all applicable flood hazard ordinance provisions of article
13.12-4 and shall be elevated or flood pr oofed in accordance with elevations
established in subsection 13.12-3.030(K).
1. Data from preliminary, draft, and final flood insurance studies constitutes best
available data. Refer to FEMA Floodpl ain Management Technical Bulletin 1
Use of Flood Insurance Study (FIS) Data as Available Data, current edition. If
an appeal is pending on the study in accordance with 44 CFR ch. 1, parts 67.5
and 67.6, the data does not have to be used.
2. When BFE data is not available from a fe deral, state, or other source, one of
the following methods may be used to determine a BFE. For further
information regarding the methods for determining BFEs listed below, refer to
FEMA's manual Managing Floodplain Deve lopment in Approximate Zone A
Areas:
a. Contour interpolation:
i. Superimpose approximate Zone A boundaries onto a topographic
map and estimate a BFE.
ii. Add one-half of the contour interval of the topographic map that is
used to the BFE.
b. Data extrapolation. A BFE can be dete rmined if a site within 500 feet
upstream of a reach of a stream for which a 100-year profile has been
computed by detailed methods, a nd the floodplain and channel bottom
slope characteristics are relatively si milar to the downstream reaches. No
hydraulic structures shall be present.
c. Hydrologic and hydraulic calculations. Perform hydrologic and hydraulic
calculations to determine BFEs using FEMA approved methods and
software.
13.12-4.050. - Standards for streams with established BFEs but without floodways.
Along rivers and streams where BFE data is provided without a floodway are identified
for a SFHA on the FIRM or in the FIS. The following provisions apply within such areas:
A. No encroachments, including fill, new c onstruction, substantial improvements, or
other development, shall be permitte d unless certification with supporting
technical data by a registered professional engineer is provided demonstrating that
the cumulative effect of the proposed development, when combined with all other
existing and anticipated development, will not increase the water surface
elevation of the base flood more than one foot at any point within the community.
13.12-4.060. - Coastal high hazard areas (V-zones).
Located within the SFHAss established in section 13.12-1.040, Lands, or subsection
13.12-3.050(K) are areas designated as coasta l high hazard areas. These areas have
special flood hazards associated with wave wash. The following provisions shall apply
within such areas:
A. All buildings or structures shall be located landward of the first line of stable
natural vegetation and comply with all applicable DHEC and OCRM setback
requirements.
B. All new construction and substantial improvements shall be elevated so that the
bottom of the lowest supporting horizontal structural member (excluding pilings
or columns) of the lowest floor is located no lower than three foot above the BFE.
C. All buildings or structures shall be secu rely anchored on pilings or columns,
extending vertically below a grade of suff icient depth and the zone of potential
scour, and securely anchored to the subsoil strata.
D. All pilings and columns and th e attached structures shal l be anchored to resist
flotation, collapse, lateral movement and scour due to the effect of wind and water
loads acting simultaneously on all building components.
E. A registered professional e ngineer shall certify that th e design, specifications and
plans for construction are in complian ce with the provisions contained in
subsections 13.12-4.060(C), (D), and (F).
F. There shall be no fill used as structural support. Non-compacted fill may be used
around the perimeter of a building for landscaping/aesthetic purposes provided the
fill will wash out from storm surge, thereby rendering the building free of
obstruction prior to generating excessive lo ading forces, ramping effects, or wave
deflection. Only beach compatible sand may be used. The floodplain
administrator shall approve design plans for landscaping/aesthetic fill only after
the applicant has provided an analysis by an engineer, and/or soil scientist that
demonstrates that the following factors have been fully considered:
1. Particle composition of fill material does not have a tendency for excessive
natural compaction;
2. Volume and distribution of fill will not cause wave deflection to adjacent
properties; and
3. Slope of fill will not cause wave run-up or ramping.
G. There shall be no alteration of sand dune s that would increase potential flood
damage.
H. All new construction and substantial improvements have the space below the
lowest floor either free of obstruc tion or constructed with non-supporting
breakaway walls, open wood lattice-work, or insect screening intended to collapse
under wind and water loads without causi ng collapse, displacement, or other
structural damage to the elevated por tion of the building or supporting foundation
system. For the purpose of this section, a breakaway wall shall have a design safe
loading resistance of not less than ten and no more than 20 pounds per square
foot. Breakaway wall enclosures shall not exceed 299 square feet. Only flood
resistant materials shall be used below the required flood elevation specified in
13.12-4.010(C). One wet location switch and/or outlet connected to a ground fault
interrupt breaker may be installed belo w the required lowest floor elevation
specified in 13.12-4.010(E).
Use of breakaway walls which exceed a design safe loading resistance of 20
pounds per square foot may be permitted only if a registered professional engineer
certifies that the designs proposed meet the following conditions:
1. Breakaway wall collapse shall result from water load less than that which
would occur during the base flood.
2. The elevated portion of the building and supporting foundation system shall
not be subject to collapse, displacement, or other structural damage due to the
effects of wind and water loads acting simultaneously on all building
components (structural and nonstructural) . The water loading shall be those
values associated with the base flood. The wind loading values shall be those
required by applicable IBC International Building Codes.
3. Such enclosed space shall be useable solely for parking of vehicles, building
access, or storage. Such space shall not be used for human habitation, finished
or partitioned into multiple rooms, or temperature-controlled.
I. No manufactured homes shall be permitted except in an existing manufactured
home park or subdivision. A replacement manufactured home may be placed on a
lot in an existing manufactured home park or subdivision pr ovided the anchoring
and elevation standards of subsection 13.12-4.020(C).
J. Recreational vehicles shall be permitted in coastal high hazard areas provided that
they meet the recreationa l vehicle criteria of s ubsection 13.12-4.020(F) and the
provisions of subsection 13.12-4.020(I). Recreational vehicles, park model
trailers and campers are prohibited as a pr incipal use on any si ngle lot of record
located within the unincorporated portions of Edisto Island.
K. Accessory structures, below the required lowest floor elevation specified in
subsection 13.12-4.060(B), are prohibited except for the following:
1. Swimming pools.
a. They are installed at-grade or elevated at or above the DFE so long as the
pool will not act as an obstruction.
b. They must be structurally independent of the building and its foundation.
c. They may be placed beneath a coastal building only if the top of the pool
and any accompanying decking or wa lkway are flush with the existing
grade and only if the lower area remains unenclosed.
d. As part of the certification proc ess for V-zone buildings the design
professional must consider the effects th at any of these elements will have
on the building in question and any nearby buildings.
2. Access stairs attached to or beneath an elevated building:
a. Must be constructed of flood-resistant material;
b. Must be constructed as open staircases so they do not block flow under the
structure in accordance with 44 CFR 60.3(e)(5).
3. Decks.
a. If the deck is structurally attached to a building then the bottom of the
lowest horizontal member must be at or above the elevation of the
buildings lowest horizontal member.
b. If the deck is to be built below the BFE then it must be structurally
independent of the main building and must not cause an obstruction.
c. If an at-grade, structurally indepe ndent deck is proposed then a design
professional must evaluate the design to determine if it will adversely
affect the building and nearby buildings.
L. Parking areas should be located on a stable grade under or landward of a
structure. Any parking surface shall consist of gravel or aggregate.
M. All new and replacement utility equipm ent and systems, which include water
supply, sanitary sewage, electrical, and HVAC including ductwork, and other
service facilities shall be designed and installed to minimize or eliminate
infiltration of floodwaters in to these systems or compone nts, or discharges from
these systems into floodwaters during c onditions of the DFE. This requirement
does not include the installation of outdoor faucets for shower heads, sinks, hoses,
etc., as long as cut off devices and back flow devices are installed to prevent
contamination and minimize flood damage s to the building. No utilities or
components shall be attached to breakaway walls.
ARTICLE 13.12-5. - VARIANCE PROCEDURES
Sections:
13.12-5.010. - Establishment of the zoning board of appeals (ZBA).
13.12-5.020. - Right to appeal.
13.12-5.030. - Historic structures.
13.12-5.040. – Functionally dependent uses.
13.12-5.050. - Agricultural structures.
13.12-5.060. - Considerations.
13.12-5.070. - Findings.
13.12-5.080. - Floodways.
13.12-5.090. – Conditions.
13.12-5.010. - Establishment of the zoning board of appeals (ZBA).
The ZBA as established by the Colleton County council shall hear and decide requests for
appeals and eligible variances from the requirements of this chapter.
13.12-5.020. - Right to appeal.
Any person aggrieved by the decision of th e ZBA or any taxpayer may appeal such
decision to the county circuit court.
13.12-5.030. - Historic structures.
Variances may be issued for the repair or re habilitation of historic structures upon the
determination that the proposed repair or reha bilitation will not prec lude the structure's
continued designation as a hist oric structure and the varian ce is the minimum necessary
to preserve the historic character and design of the structure.
13.12-5.040. - Functionally dependent uses.
Variances may be issued for development necessary for the conduc t of a functionally
dependent use, provided the criteria in 13.12- 5.050 are met, no reas onable alternative
exist, and the development is protected by methods that minimize flood damage and
create no additional threat to public safety.
13.12-5.050. – Agricultural Structures.
Variances may be issued to wet floodproof an agricultural structure provided it is used
solely for agricultural purposes. In orde r to minimize flood damages during the base
flood and the threat to public health and sa fety, the structure must meet all of the
conditions and considerations of 13.12-5.080., this section, and the following standards:
A. Use of the structure must be limited to agricultural purposes as listed below:
1. Pole frame buildings with open or closed sides used exclusively for the storage of
farm machinery and equipment,
2. Steel grain bins and steel frame corncribs,
3. General-purpose barns for the temporary feeding of livestock that are open on at
least one side;
4. For livestock confinement buildings, poultry houses, dairy operations, and similar
livestock operations, variances may not be issued for structures that were
substantially damaged. New construction or substantial improvement of such
structures must meet the elevation requirements of 13.12-4.020(B) of this
ordinance; and
B. The agricultural structure must be built or rebuilt, in the case of an existing building
that is substantially damaged, with flood -resistant materials for the exterior and
interior building components and elements below the base flood elevation.
C. The agricultural structure must be adequately anchored to prevent flotation, collapse,
or lateral movement. All of the structure' s components must be capable of resisting
specific flood-related forces includi ng hydrostatic, buoyancy, hydrodynamic, and
debris impact forces. Where flood velociti es exceed 5 feet per second, fast-flowing
floodwaters can exert considerable pressure on the building's enclosure walls or
foundation walls.
D. The agricultural structure must meet the venting re quirement of 13.12-4.020(D) of
this ordinance.
E. Any mechanical, electrical, or other utility equipment must be located at or above the
DFE, or be contained within a watertight , floodproofed enclosure that is capable of
resisting damage during flood conditions in accordance with 13.12-4.010(E) of this
ordinance.
F. The agricultural structure must comply with the floodway encroachment provisions of
13.12-4.020(E) of this ordinance.
G. Major equipment, machinery, or other conten ts must be protected. Such protection
may include protective watert ight floodproofed areas within the building, the use of
equipment hoists for readily elevating contents, permanently elevating contents on
pedestals or shelves above th e base flood elevation, or determining that property
owners can safely remove contents without ri sk to lives and that the contents will be
located to a specified site out of the floodplain.
13.12-5.060. - Considerations.
In passing upon such applications, the ZBA sh all consider all technical evaluations, all
relevant factors, all standards specified in other sections of this chapter, and:
A. The danger that materials may be swept onto other lands to the injury of others;
B. The danger to life and property due to fl ooding or erosion damage, and the safety
of access to the property in times of flood for ordinary and emergency vehicles;
C. The susceptibility of the proposed facili ty and its contents to flood damage and
the effect of such damage on the individual owner;
D. The importance of the serv ices provided by the prop osed facility to the
community;
E. The necessity of the facil ity to a waterfront locati on, (functionally dependent)
where applicable;
F. The availability of alte rnative locations, not subject to fl ooding or erosion
damage, for the proposed use;
G. The compatibility of the proposed use with existing and anticipated development,
and the relationship of the proposed use to the comprehensive plan and floodplain
management program for that area;
H. The expected heights, velocity, duration, rate of rise, and sediment transport of the
floodwaters and the effects of wave action, if applicable, expected at the site;
I. The costs of providing governmental serv ices during and after flood conditions
including maintenance and repair of public utilities and facilities such as sewer,
gas, electrical and water systems, and roads and bridges; and
J. Agricultural structures must be located in wide, expansive floodplain areas, where
no other alternative location for the agri cultural structure exists. The applicant
must demonstrate that the entire farm acreage, consisting of a contiguous parcel
of land on which the structur e is to be located, must be in the SFHA and no other
alternative and viable locations for the structure are available.
13.12-5.070. - Findings.
Findings listed above shall be submitted to the ZBA, in writing, and included in the
application for a variance. Additionally, co mments from the SCDNR, OCRM, SCDHEC,
state coordinator's office, and the Army Corp s. Of Engineers (USACE ), as appropriate,
must be taken into account and included in the permit file.
13.12-5.080. - Floodways.
Variances shall not be issued within any de signated floodway if a ny increase in flood
levels, or changes in the floodway configur ation during the base flood discharge would
result unless a CLOMR is obtained prior to i ssuance of the variance. In order to insure
the project is built in compliance with the CLOMR for which the variance is granted the
applicant must provide a bond for 100 percent of the cost to perform the development.
13.12-5.090. - Conditions.
Upon consideration of the factors listed above and the purposes of th is chapter, the ZBA
may attach such conditions to the granting of variances as it deems necessary to further
the purposes of this chapter. The following conditions shall apply to all variances:
A. Variances may not be issued when th e variance will make the structure in
violation of other federal, state, or local laws, regulations, or ordinances.
B. Variances shall only be issued upon a determination that the variance is the
minimum necessary, considering the SFHA or floodway, to afford relief.
C. Variances shall only be issued upon a s howing of good and sufficient cause, a
determination that failure to grant the variance would result in exceptional
hardship, and a determination that the gran ting of a variance w ill not result in
increased flood heights, change in floodw ay configuration, a dditional threats to
public safety, extraordinary public expens e, create nuisance, cause fraud on or
victimization of the public, or conflict with existing local laws or ordinances.
D. Any applicant to whom a variance is granted shall be given written notice
specifying the difference between the BFE and the elevation to which the
structure is to be built and a written statem ent that the cost of flood insurance will
be commensurate with the increased risk resulting from the re duced lowest floor
elevation. Such notification shall be main tained with a record of all variance
actions.
E. The floodplain administrator shall maintain the records of all appeal actions and
report any variances to FEMA upon request.
F. Variances shall not be issued for unpermitted development or other development
that is not in compliance with the provision s of this chapter. Violations must be
corrected in accordance with subsection 13.12-3.040(E).
ARTICLE 13.12-6. - LEGAL STATUS PROVISIONS
Sections:
13.12-6.010. - Effect on rights and liabilitie s under the existing flood damage
prevention ordinance.
13.12-6.020. - Effect upon outstanding building permits.
13.12-6.030. - Effective Date.
13.12-6.010. - Effect on rights and liabiliti es under the existing flood damage
prevention ordinance.
This chapter in part comes forward by re-ena ctment of some of the provisions of the
flood damage prevention ordinance enacted April 7, 1987, as amended October 7, 2008,
and it is not the intention to repeal but rather to re-enact and continue to enforce without
interruption of such existing prov isions, so that all rights and liabilities that have accrued
thereunder are reserved and may be enforce d. The enactment of th is chapter shall not
affect any action, suit or proceeding institu ted or pending. All provisions of the flood
damage prevention ordinance of Colleton C ounty enacted on April 7, 1987, as amended
October 7, 2008, which are not reenacted herein, are repealed.
13.12-6.020. - Effect upon outstanding building permits.
Nothing herein contained sha ll require any change in the plans, construction, size or
designated use of any building, structure or part thereof for which a building permit has
been granted by the chief building inspector or his authorized agents before December 2,
2001; provided, however, that when constr uction is not begun under such outstanding
permit within a period of 60 da ys subsequent to passage of this chapter, construction or
use shall be in conformity with the provisions of this chapter.
13.12-6.030. - Effective Date.
This chapter shall become effective October 7, 2008.
3. Title 13 – Buildings and Construction, Chapter 13.16 – Manufactured/Mobile Homes,
of the Colleton County Code of Laws (the same being inclusive of and one with the
Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in
its totality to read as follows:
CHAPTER 13.16. – MANUFACTURED/MOBILE HOMES
Sections:
13.16.020. – Regulation of placement of certain manufactured or mobile homes.
13.16.030. – Wind Zone Requirements.
13.16.040. – Duty of owner to obtain a registration decal.
13.16.050. – Installation.
13.16.060. – Repair, alteration or modification.
13.16.070. – Permits required.
13.16.080. – Prerequisites for power.
13.16.090. – Change of occupancy.
13.16.100. – Temporary use permits.
13.16.110. – Discretion of the director of planning and development and building
official.
13.16.120. – Penalty.
13.16.020. - Regulation of placement of certain manufactured or mobile homes.
A. For the purposes of this Chapter, home or homes shall mean mobile homes or
manufactured homes, and manufactured homes shall mean mobile homes, and
vice-versa.
B. No mobile homes manufactured pr ior to June 15, 1976, which are not
currently permitted by Colleton County, may be brought into and granted a
permit for placement in Colleton County, South Carolina.
C. Mobile homes manufactured prior to J une 15, 1976, which are, as of the date
of the passage of the ordinance codified in this chapter, situated and legally
permitted to be located in Colleton County may remain and may be granted a
permit for relocation within the county, if structurally sound for relocation.
D. Homes that have not been correctly or legally registered ; derelict or non-
habitable; deemed as no-value by the assessor's office; condemned by code
enforcement; or otherwise removed from the tax rolls for any reasons, will be
required to meet the guidelines within this chapter before said home can
remain in the county. Such homes will require an inspection by the building
department before power can be restored.
13.16.030. - Wind zone requirements.
A. Federal law defines wind zone 2 as all areas within the boundaries of Colleton
County, South Carolina. All manufactured homes are required to be labeled to
meet the minimum wind speed for the zone in which they ar e to be placed.
Consequently, only homes built to wind zone 2 or 3 specifications, and
labeled as wind zone 2 or 3 units, may be placed in Colleton County. The
wind zone requirements are provisions of federal law, and no exceptions or
variances are permitted; therefore, only wind zone 2 or 3 homes will be
permitted to move and be placed within Colleton County.
B. Wind zone 1 homes curren tly located and properly registered within the
boundaries of Colleton County as of October 3, 2000, may continue to be
occupied and used within the boundaries of Colleton County.
13.16.040. - Duty of owner to obtain a registration decal.
Each owner of a manufactured home locat ed in Colleton County shall obtain and
display a county registration decal as re quired by state law, within 15 days of
purchase, or change of ownership, or if the manufactured home is relocated, except
where:
A. The unit is temporarily located w ithin the county for the express
predetermined purpose of conveyance outsi de the county within 30 days after
arrival;
B. The unit is held for display or exhi bition purposes by a manufactured home
dealer licensed by the state as such; or
C. The unit is passing through the county on a public street, road, or highway for
conveyance elsewhere.
13.16.050. - Installation.
The manufacturer's installation manual is the document to be used for the first
placement of new manufactured homes; whereas subsequent installations must utilize
the South Carolina Manufactured Housi ng Board regulations. Such written
instructions must be available at the job site at the time of the inspection by the
county building inspector. A manufactured home installer shal l be liable to the
purchaser of the manufactured home for failure to properly install/set up the
manufactured home pursuant to the requirements of this chapter.
13.16.060. - Repair, alteration, or modification.
A. Renovations, repairs, or modifications to manufactured homes are performed
under the jurisdiction of the local building authority where the home is
located.
B. Such work shall be performed in acco rdance with the requirements of the
most recently adopted edition of the In ternational Residential Code (IRC),
except where such repairs are perf ormed by a qualified manufacturer's
technician during the warranty period. In that case, the repa irs shall comply
with the Federal Manufactured Housing Construction and Safety Standards.
C. A South Carolina manufactured home contractor or repairer, a licensed
residential builder, a licensed general contractor, a license d retail dealer or
manufacturer, or an employee thereo f for homes sold or manufactured by
them, or a registered residential specialty contractor (as long as the Residential
Builders' Commission recognizes the speci alty), are all permitted to repair,
alter, and/or modify manufactured homes.
13.16.070. - Permits required.
A. A permit shall be required for the placement of any manufactured home
within the unincorporated areas of Co lleton County. Only a licensed dealer or
installer of manufactured homes, or the unit's owner, if said owner is actually
performing the installation, shall apply fo r the permit. It shall be unlawful for
any person selling a manufactured home, or for a manufactured home mover,
to deliver or place a unit upon any prospective temporary or permanent site
without first having secured a manufactured home placement permit.
B. No repair, renovation, or al teration to a manufactured home shall commence
until a valid permit for such work has been applied for and issued by the
planning and development department.
C. Where work on a mobile home or its pl acement on a parcel has occurred prior
to obtaining the required permit(s), a ny and all required permit fees shall be
doubled, which may include the zoning permit, the manufactured home permit
and/or building permit, as required. The payment of such doubled fee shall not
relieve any persons from fully comply ing with the requirements of this
chapter or with any other applicable codes in the execution of the work, nor
from any other penalties prescribed. Failure to pay the double permit fees
before work recommences shall initiate a citation where a court date will be
assigned.
13.16.080. - Prerequisites for power.
A. No electric service provid er shall install a new conn ection of electricity to a
manufactured home unless the director or assigned compliance officer has
released permission to the provider. Th is includes manufactured homes where
the power was turned off due to fire or other catastrophe, which requires a
permit and inspection of the home prior to authorizing the power to be turned
back on.
B. If the electrical connection has been completed without proper inspections, the
director or assigned compliance officer will require the provider to remove
such service immediately, and the double permit fees and/or citation issuance
defined in 13.16.070(C) above shall apply, as appropriate.
13.16.090. - Change of occupancy.
A. HUD labeled manufactured homes are cons tructed as single-family detached
residences only. They are not designed or intended for use as, nor will they meet
any building code requirements for, offi ces, stores/shops, class rooms, places of
assembly, storage buildings, etc.
B. A home-occupation may be conducted from a manufactured home, as long as that
use is permitted in the zoning district where the home is located, there are no
existing HOA CC&Rs prohibiting it, and su ch use meets the provisions of any
applicable state or federal laws, and the principal use remains as a residence.
13.16.100. - Temporary use permits.
The following is the only instance for which a temporary permit may be considered for a
manufactured home:
A. Permitting the temporary set up of a manufactured home for the purpose of
remodeling or bringing such unit up to building standards. In this case, no
plumbing hookup or electrical permit will be approved. This permit will expire in
90 days. Additional 30-day extensions may be requested from the director, but
approval is not guaranteed.
B. Nothing in this section exempts an a pplicant from securing all other required
permits. Primary building permits must be applied for at the time the temporary
use permit is approved.
13.16.110. - Discretion of the director of planning and development and building
official.
A. The director has the authority to render interpretations of this chapter and to adopt
policies and procedures to clarify the application of its provisions. Such
interpretations, policies and procedures sh all be in conforman ce with the intent
and purpose of this chapter.
B. It shall also be at the discretion of th e building official, with approval by the
director to request disconnection of power and/or utilities to a manufactured home
that has been installed or set up illegall y, improperly, or without proper authority,
when a home is in violation of this chapte r or any other applicable state or federal
laws; or where necessary due to safety and/or hazardous conditions.
13.16.120. - Penalty.
Any person violating or failing to comply with any of the provisions of this chapter shall
be deemed guilty of a misdemeanor and upon conviction shall be fined not more than
$500.00 or imprisoned for not more than 30 da ys for each such violation. Each day of
noncompliance with the provisions of this chapter shall constitute a separate offense.
4. Title 13 – Buildings and Construction, Chapter 13.20 – Uniform Ordinance Summons,
of the Colleton County Code of Laws (the same being inclusive of and one with the
Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in
its totality to read as follows:
CHAPTER 13.20. - UNIFORM ORDINANCE SUMMONS
Sections:
13.20.010. - Ordinance summons form.
13.20.020. - Department responsibilities.
13.20.030. - Court and officer copies.
13.20.040. - Record maintenance for annual audit of summons.
13.20.050. - Violation—Penalty.
13.20.060. - Custodial arrest and motor vehicle regulation enforcement excluded.
13.20.010. - Ordinance summons form.
There shall be made available to all count y compliance officers (which includes code
enforcement officers, litter control o fficers, building inspectors, zoning
administrators, floodplain administrators, sher iff’s deputies, and the fire marshal) of
this county an ordinance summons which complies with the requirements of S.C.
Code 1976, § 56-7-80, as amended. The form sh all be substantially the same as the
form which is attached to the ordinance c odified in this chapter and amended herein.
The summons shall have the same affect whether served in person or sent by certified
mail.
13.20.020. - Department responsibilities.
The planning and development department shall be responsible for having the
summons books printed, issuing blank summo ns books, and keeping a record of the
summons forms assigned to each individual co mpliance officer or in the case of fire-
rescue and sheriff’s deputies, the forms assigned to those departments.
13.20.030. - Court and officer copies.
Any compliance officer issuing an ordina nce summons shall be responsible for
forwarding the copy of the summons labeled "Court Copy" to the appropriate judicial
office within 48 hours of issuing the summons. It shall also be the issuing officer's
responsibility to keep the copy of the su mmons labeled "Officer Copy" until the
appointed hearing time. After all action concerning the summons has been concluded,
the issuing officer shall provide the "Officer Copy" of the summons to the director or
the fire-rescue director (or their designees) within 48 hours.
13.20.040. - Record maintenance for annual audit of summons.
Planning and development and fire-rescue sh all each be responsible for keeping the
summons forms that have been turned in by their respective compliance officers in a
manner which will allow for an annual audit of the summons forms.
13.20.050. - Violation—Penalty.
A. Any person who fails to appear befo re the court as re quired by a uniform
ordinance summons, without first ha ving posted such bond, as may be
required, or without having been granted a continuance by the court, is guilty
of a misdemeanor and, upon conviction, must be fined not more than $500.00
and/or be imprisoned for not less than two days nor more than 30 days.
B. Any person, who is issued a summons fo r violation of the provisions of the
Public Nuisance, Building & Construction, Land Development, Zoning, Flood
Damage Prevention, and/or Fire Code s as adopted by Colleton County, shall
upon conviction of such violation, be guilty of a misdemeanor, and the
penalties prescribed by the individual code, chapter, section or by Chapter
1.08, General Penalty, of the Colleton County Code of Laws shall apply.
13.20.060. - Custodial arrest and motor vehicle regulation enforcement excluded.
The uniform ordinance summons may not be used to perform a custodial arrest.
Further, no county ordinance regulating the use of motor vehicles on the public roads
of the state can be enforced using this uniform ordinance summons. This chapter does
not prohibit the county fr om enforcing ordinances by any other means allowed by
law.
5. Severability:
If any provision of this Ordinance or the application thereof to any person or circumstances is
held invalid, the invalidity doe s not affect other pr ovisions or applications of the Ordinance
which can be given effect without the invalid provision or applicatio n and to this end, the
provisions of this Ordinance are severable.
6. Conflict:
Provisions in other County Ordinances, Resolutions, policies, or by-laws in conflict with this
Ordinance are hereby repealed.
ATTEST: SIGNED:
________________________ __________________________
Kaela Brinson, Council Clerk Steven D. Murdaugh, Chairman
____________________________ COUNCIL VOTE:
Approved as to Form OPPOSED:
Sean Thornton, County Attorney
1
Sponsor(s) : County Council
First Reading : March 1, 2022 I, ____________________,
Committee Referral : N/A Council Clerk, certify that this
Committee Consideration Date : N/A Ordinance was adverti sed for
Committee Recommendation : N/A Public Hearing on __ _____.
Second Reading : April 5, 2022
Public Hearing : May 3, 2022
Third Reading : May 3, 2022
Effective Date : Immediately
ORDINANCE NO. 22-O-05
COUNCIL-ADMINISTRATOR FORM OF GOVERNMENT FOR COLLETON COUNTY
[TO AMEND TITLE 14 – LAND M ANAGEMENT, CHAPTER 14.04 – LAND
DEVELOPMENT REGULATIONS AND CHAP TER 14.08 – ZONING , TO COINCIDE
WITH THE TEN YEAR UPDA TE OF THE COLLETON CO UNTY COMPREHENSIVE
PLAN.]
WHEREAS:
1. Title 14 – Land Management, Chapter 14.04 – Land Development Regulations, of the
Colleton County Code of Ordinances were reviewed by the Planning Commission on
November 23, 2020, December 29, 2020 and March 28, 2022; and
2. Title 14 – Land Management, Chapter 14.08 – Zoning, of the Colleton County Code of
Ordinances were reviewed by the Planni ng Commission on December 29, 2020, January 25,
2021 and March 28, 2022; and
3. Chapters 14.04 and 14.08 were edited for le gal sufficiency, redundancy and/or unnecessary
words and phrases, and updated and clarified simp lified phrases in order to be current with
the accepted American Planning Association (APA) principles and practices; and
4. County Council believes it is in the best interest of the citizens of Colleton County to approve
the changes set forth herein.
NOW, THEREFORE, BE IT ORDAINED BY COLLETON COUNTY COUNCIL, DULY
ASSEMBLED, THAT:
1. Title 14 – Land Management, Chapter 14.04 – Land Development Regulations, of the
Colleton County Code of Laws (the same being inclusive of and one with the Originating and
Amending Ordinances), and all subparagraphs ther eof, is hereby amended in its totality to
read as follows:
CHAPTER 14.04. - LAND DEVELOPMENT REGULATIONS
ARTICLE 14.04-1. - PURPOSE AND AUTHORITY
2
Sections:
14.04-1.010. - Title.
14.04-1.020. - Purpose and authority.
14.04-1.030. - Jurisdiction.
14.04-1.010. - Title.
This chapter shall be known and may be c ited as the Land Development Regulations of
Colleton County, South Carolina.
14.04-1.020. - Purpose and authority.
The purpose of these land development regula tions is to promote the public health,
safety, and welfare of the residents and re quire the harmonious, orderly, controlled and
sustainable development of land within the coun ty. In furtherance of this general intent,
the regulation of land development by the county is authorized by S.C. Code 1976, § 6-
29-1120 for the following purposes, among others:
A. To encourage the developmen t of economically sound and sustainable municipalities
and counties;
B. To assure the timely provision of required st reets, utilities, and other facilities and
services to new land developments;
C. To assure the adequate provision of safe and convenient traffic access and circulation,
for motorists, bicyclists and pedestrians, in and through new land developments;
D. To assure the provision of needed public open spaces and building sites in new land
developments through the dedication or reservation of land for recreational,
educational, transportation, and other public purposes; and
E. To assure, in general, wise, timely and su stainable development of new areas, and
redevelopment of previously developed areas in harmony with the comprehensive
plans of municipalities and counties.
14.04-1.030. - Jurisdiction.
The regulations contained herein shall govern each and every subdivision and installation
of infrastructure within the county outside of the jurisdiction of any incorporated
municipality, except those we have an intergovernmental agreement with to do their
planning, zoning, building permitting and inspections.
ARTICLE 14.04-2. - LEGAL PROVISIONS
Sections:
14.04-2.010. - Administration.
3
14.04-2.020. - General legal provisions.
14.04-2.030. - Existing and future ordinances.
14.04-2.040. - Severability and validity.
14.04-2.050. - Violations and penalties.
14.04-2.060. - Appeals.
14.04-2.070. - Modifications.
14.04-2.080. - Amendments.
14.04-2.090. – Delegated authority to staff.
14.04-2.100. - Abrogation.
14.04-2.110. – Repeal of conflicting ordinances.
14.04-2.120. – Effective date of adoption.
14.04-2.010. - Administration.
In accordance with S.C. Code 1976, § 6- 29-1150(C), the planning commission is
responsible for the administra tion of the land development regulations. The planning
commission hereby designates the director of planning an d development hereinafter
(director) or his designee to perform the duties as set forth herein.
14.04-2.020. - General legal provisions.
A. No subdivision plat, survey, or other land development plan within the jurisdiction of
the county may be filed or recorded in the county office where deeds are recorded
until it bears the stamp of approval and is properly signed by the director.
B. No building permit may be issued until the plat or site plan is approved and properly
signed by the authority designated in this chapter.
C. If the developer defaults in installing re quired site improvements, the County can use
the proceeds of the required surety bond or other security instrument posted by the
developer to install the required improvements.
14.04-2.030. - Existing and future ordinances.
All proposed development of land must comply in all respects with the requirements of
chapter 14.08, pertaining to zoning, chapte r 13.12, pertaining to floodplain damage
prevention, and, where applicable, any other officially adopted ordinances, plans or maps
approved by the county.
14.04-2.040. - Severability and validity.
Should any section or provision of this ch apter be decided by a court of competent
jurisdiction to be unconstitutional or invalid, such decision shall not affect the validity of
the chapter as a whole or any part thereof other than the part so declared to be
unconstitutional or invalid.
14.04-2.050. - Violations and penalties.
A. Complaints regarding violations. Whenever an alleged violation of this chapter
occurs, the director or his de signee shall investigate such complaint, and take such
action as provided by this chapter. Complaints may be filed in writing or verbally,
stating fully the cause and basis thereof.
4
B. Penalties for violations.
1. Except as otherwise provided herein, the owner or agent of the owner of any land
to be subdivided within th e unincorporated portion of the county who transfers or
sells the land by reference to or exhibi tion of or by other use of a plat of
subdivision of the land before the plat ha s been approved by the director and/or
the planning commission and recorded in the office of the register of deeds in and
for the county, shall be guilty of a misdemeanor and, upon conviction thereof,
shall be punished in the discretion of th e court; and the description by metes and
bounds in the instrument of transfer or other document used in the process of
selling or transfer shall not exempt th e transaction from these penalties. The
county may enjoin the transfer or sale or agreement by appropriate action.
2. Where any building, structure, or sign is or is proposed to be erected, constructed,
reconstructed, altered, converted, demolished, maintained, or be used in violation
of this chapter, the director or hi s designated compliance officers may, in
accordance with the provisions of S.C. Code 1976, § 56-7-80, as amended, issue a
stop-work-order, an ordinance summons, or institute injunction, mandamus, or
other appropriate action or proceeding to prevent such unlawful erection,
construction, reconstruction, alteration, conversion, demolition, maintenance, or
use; to correct or abate the violation or to prevent the occupancy of the building,
structure, or land. Each day such unlaw ful erection, construction, reconstruction,
alteration, conversion, demolition, maintenance, or use continues shall be deemed
a separate offense.
3. Failure to apply for the appropriate and required permits, including building,
zoning, sign and/or floodplain permits, prior to commencing any work requiring
a permit shall require the director or his designated compliance officers to
issue a stop-work-order. The stop-work-order cannot be removed to allow
further work to commence until the applicant has submitted everything required
for each required permit, received a pproval on all permits, and paid a double-
permit fee fine for all permits required. Fa ilure of the applicant to comply and/or
pay the double-permit fee fine may cause the property owner to be fined up to
$500.00 and serve up to 30 days in jail in accordance w ith Colleton County
Codes, where each day’s violation of any provision of this chapter shall constitute
a separate offense.
14.04-2.060. - Appeals.
A. Questions arising from the enforcement of these re gulations by the director or his designated
compliance officers may be appealed to the pl anning commission for consideration within 30
days of the decision. The planning commission will render a decision on the appeal within 60
days and the appellant will be notified, in wr iting, of such decision within seven business
days.
5
B. Any party aggrieved by a decision of the pl anning commission regarding the standards
enumerated in these regulations or a ruling on a requested modification may appeal the
decision to the circuit court of the county. Th e aggrieved party shall file a petition with the
clerk of court within 30 days of the planning commission decision.
14.04-2.070. - Modifications.
A. The planning commission may grant, upon wr itten request, design modifications to
the requirements of article 14.04-5 if the strict application of the requirements would
create an undue hardship in the development of land. Such hardship cannot be created
by the applicant or be requested for the so le purpose of increasing profitable gain.
Design modification requests shall be prepared by the property owner, developer, or
agent and address the criteria in subsection C of this section.
B. Requests for design modifications shall be submitted at the same time the plat is
submitted.
C. Before granting the design modification, th e planning commission sh all state, for the
record, that the following findings are sa tisfied. In reaching such conclusion, the
commission may utilize the written request prepared by the applicant or other
applicable information.
1. The design modification is justified due to topographical or other special
conditions unique to the property.
2. The design modification will not comp romise the intent or purpose of the
regulations.
14.04-2.080. - Amendments.
A. The planning commission is responsi ble for the review and recommendation of
amendments to the land development regulations to the county council for adoption.
B. The county council may adopt amendments to this chapter by enacting an ordinance
following a duly noticed public hearing.
C. A public hearing for an amendment to this chapter shall have a minimum of 30 days'
notice by publication in a newspaper of ge neral circulation including the time and
place of the hearing in accordance with S.C. Code 1976, § 6-29-1130(B).
14.04-2.090. - Delegated authority to staff.
Pursuant to S.C. Code 1976, § 6-29-1150, the planning commission delegates review and
approval authority to the direct or of planning and development, hereinafter (director) or
his designee for all exempt plats, minor and major subdivisions, summary plats, boundary
surveys, final plats and commercial deve lopment projects. Only major subdivision
preliminary plats require the approval of the planning commission.
14.04-2.100. - Abrogation.
6
It is not intended that this ch apter repeal, abrogate , annul, impair, or interfere with any
existing easements, covenants, deed restrict ions, agreements, rules, regulations, or
permits previously adopted or issued pursu ant to law. However, where this chapter
imposes greater restrictions, the provisions of this chapter shall govern.
14.04-2.110. - Repeal of conflicting ordinances.
All ordinances and parts of ordi nances in conflict with this chapter are repealed to the
extent necessary to give this chapter full force and effect.
14.04-2.120. - Effective date and adoption.
The ordinance from which this chapter is deri ved shall take effect and be in force from
and after May 3, 2022.
ARTICLE 14.04-3. - SUBDIVISION TYPES AND REVIEW PROCEDURES
Sections:
14.04-3.010. - Purpose.
14.04-3.020. - Land development types.
14.04-3.030. - Minor subdivision process.
14.04-3.040. - Major subdivision process.
14.04-3.050. - Financial guarantees.
14.04-3.060. - Commercial development projects.
14.04-3.010. - Purpose.
The purpose of this article is to establish an orderly subdivision process for the county. It
is also the intent of this article to provi de a clear and comprehensive approval process
that is fair and equitable to all interests including the petitioners, affected neighbors,
county staff, and related agencies. Approved plans shall be the guiding documents for
final approval and permitting.
14.04-3.020. - Land development types.
A. Commercial development defined. Commercial development is any development
other than a single or two family residential development on a single lot, not used for
commercial gain, which excludes units for rent or lease or any owner/renter
characteristics. Commercial developments include: residential or commercial
subdivisions; multi-family apartment or c ondominium complexes; commercial retail
or service businesses, offices, parks, or cen ters; industrial developments or parks; or,
mobile home and RV parks or subdivisions.
B. Subdivision defined. According to S.C. Code 1976, § 6-29-1110(2), a subdivision is
a division of a tract or parcel of land into two or more lots, building sites or other
divisions for the purpose, whether immediate or future, of sale, lease, or building
development. It includes all division of land involving a new street or change in
existing streets. It covers the alteration of streets or establishment of new streets
within a subdivision previously approved or recorded. Subdivisio n also includes re-
7
subdivision involving furt her division or relocation of lot lines of any lot or lots
within a subdivision previously made and approved or recorded, and combinations of
lots of record.
C. Subdivision types. For all subdivisions of land, the following categories of
subdivisions shall be used to determine the procedures required for review:
1. Exempt subdivision.
a. Exempt subdivisions are exempt from the design standards of this chapter;
however, all lots are subject to the mi nimum requirements of chapter 14.08.
An exempt subdivision:
i. Involves the division of land into pa rcels of five acres or more where
no new public or private street is involved;
ii. Includes the combination or recomb ination of portions of previously
platted lots where the total number of lots is not increased and the
resultant lots are equal to the st andards of this chapter and other
applicable regulations;
iii. Includes plats for the creation of cemetery lots; or
iv. Includes a plat of a single pre-existing lot of record.
b. The director shall, when an exempt plat is submitted for recording, review
said plat to determine if it is in fact exempt from the requirements of this
chapter. An exempt subdivision sha ll be drawn to meet the Minimum
Standards Manual for the Practice of Land Surveying in South Carolina.
c. If the plat is found not to be exempt from the requirements of this chapter,
the applicant shall be instructed to submit the plat to the director for
approval and processing.
2. Minor subdivision.
a. A minor subdivision is on e which does not involve:
i. The creation of more than 15 lots fronting onto an approved, existing
public or private road or street right-of-way; or
ii. The creation of any new public or private street.
b. The minor subdivision process shall not be used twice within three years
anywhere within the original property boundaries if the total number of lots
exceeds 15 or a new public or private street is created, which then requires
the major subdivision process to be used.
3. Major subdivision. A major subdivision is any subdivision other than an exempt
or minor subdivision.
4. Planned development district (PDD) subdivision.
a. A PDD subdivision is a major subd ivision located within a PDD zoning
classification as regulated in sectio n 14.08-2.140. It is intended to allow for
8
flexibility to improve the design, char acter, and quality of new mixed use
developments and preserve natural and scenic features of open spaces.
b. Design standards set out in this chap ter may be waived or modified for
PDDs provided the intent of this chapter is not nullified or lessened and
sufficient proof is given substantiating the adequacy of the alternative
design.
5. Conservation development subdivision. A conservation development
subdivision is a type of residential subdivision that allows smaller than
minimum lot sizes and setbacks with dwelling units clustered in smaller areas to
preserve larger areas for open space a nd environmental resources developed in
accordance with section 14.08-3.020(H).
14.04-3.030. - Minor subdivision process.
The following chart illustrates the Minor Subdivision process:
A. Step 1: Pre-application meeting and sketch plan (recommended).
9
1. To secure advice in the formative stages of development, expedite applications,
and reduce development costs, the deve loper may request a pre-application
meeting and/or sketch plan review.
2. If requested, the director shall schedule a pre-application meeting to discuss all
applicable subdivision development requirements and provisions of the
comprehensive plan, land development options, what is required of the
applicant, and any other pertinent information. The director may invite or
consult with other department heads and/or affected agencies.
3. In addition or as an alternative to th e pre-application meeting, the applicant may
request an informal review of a sketch plan for the proposed subdivision.
B. Step 2: Applicant submits final plat. Applicants shall submit to the director four
copies and a digital PDF version of the fina l plat drawn to the requirements of the
Minimum Standards Manual for the Practice of Land Surveying in South Carolina,
the final plat requirements of article 14.04-4 of this chapter, and the required fee.
C. Step 3: Director review of final plat. The director shall review the plat for
compliance with this chapter, chapter 14.08, any other applicable regulations, and if
found to be in compliance, will instruct the applicant to prep are a final plat for
recording, including surveyor certification.
D. Step 4: Review and recommendat ion by other applicable agencies. The director
may at his discretion require public agencies concerned with the new development to
review and make recommendations on the plat; however, the c ounty issued building
permit does not waive any other outside agency permitting requirements. All
recommendations should be forwarded to th e director within 30 days from date of
receipt. Said public agencies may include, but not be limited to, the following:
1. South Carolina Department of Transpor tation (SCDOT), Department of Health
and Environmental Control (SCDHEC), or Department of Natural Resources
(SCDNR).
2. County Fire Marshal, County Engineer, or Department of Roads and Bridges.
3. U.S. Army Corps of Engineers or Office of Coastal Resource Management
(OCRM).
4. City of Walterboro utilities or other City Departments.
5. Any other agency or official designated by the director.
E. Step 5: Applicant revision period. The applicant shall revise the plat in accordance
with the director's review. All necessary revisions shall be made prior to approval.
F. Step 6: Director approves final plat.
10
1. Following successful revision of the final plat by the applicant, the director shall
approve the final plat by obtaining the a pplicable signatures as required by
section 14.04-4.030.
2. Final plat approval sha ll confer upon the applicant the following rights:
a. To record the plat with the register of deeds within six months of final plat
approval; and
b. To proceed with the sale and/or transfer of lots and parcels.
3. If the final plat is not recorded w ithin six months, it shall become void.
14.04-3.040. - Major subdivision process.
The following chart illustrates the Major Subdivision process:
11
A. Step 1: Pre-application meeting and sketch plan (recommended).
1. To secure advice in the formative stages of development, expede applications,
and reduce development costs, the deve loper may request a pre-application
meeting and/or sketch plan review.
2. If requested, the director shall schedule a pre-application meeting to discuss all
applicable subdivision development requirements and provisions of the
comprehensive plan, land development options, what is required of the
applicant, and any other pertinent information. The director may invite or
consult with other department heads and/or affected agencies.
3. In addition or as an alternative to th e pre-application meeting, the applicant may
request an informal review of a sketch plan for the proposed subdivision.
B. Step 2: Applicant submits prelimin ary plat and supporting documentation.
Applicants shall submit to the director 12 copies and a digital PDF version of the
preliminary plat, two copies and a digital PD F version of the construction plans, the
required fee, and all materials stipulated by section 14.04-4.030.
C. Step 3: Director review of preliminary plat. The director shall review the plat for
compliance with the requirements of th is chapter, chapter 14.08, and any other
applicable regulations.
D. Step 4: Review and recommendat ion by other applicable agencies. The director
may at his discretion require public agencies concerned with the new development to
review and make recommendations on the plat; however, the c ounty issued building
permit does not waive any other outside agency permitting requirements. All
recommendations should be forwarded to th e director within 30 days from date of
receipt. Said public agencies may include, but not be limited to, the following:
1. South Carolina Department of Transpor tation (SCDOT), Department of Health
and Environmental Control (SCDHEC), or Department of Natural Resources
(SCDNR).
2. County Fire Marshal, County Engineer, or Department of Roads and Bridges.
3. U.S. Army Corps of Engineers or Office of Coastal Resource Management
(OCRM).
4. City of Walterboro utilities or other City Departments.
5. Any other agency or official designated by the director.
E. Step 5: Applicant revision period. The applicant shall revise the plat in accordance
with the director's review.
F. Step 6: Review and approval of preliminary plat by planning commission.
12
1. Upon completion of the revised plat, the director shall forward the preliminary
plat and all staff and agency recommendations to the planning commission.
2. The planning commission shall act on th e application at their next regularly
scheduled monthly meeting. In its de liberation, the planning commission may
approve, approve conditionally, require resubmittal, or deny approval.
3. If the preliminary plat is disapproved or approved conditionally, all reasons shall
be conveyed to the applicant, referring specifically to those parts of the
comprehensive plan or ordinances to which the plat does not conform. The
commission may also require the applicant to resubmit the preliminary plat with
all recommended changes made, before approving said plat.
4. If the preliminary plat is found to c onform to all requirements of the county
comprehensive plan and applicable subdivi sion codes, approval shall be granted
by the planning commission. One copy shall be retained by the planning office
and one copy provided to the applicant.
5. Preliminary plat approval shall confer upon the applicant the following rights for
one year from the date of approval, unless extended by the planning
commission:
a. To proceed under the supervision of th e county, with the in stallation of site
improvements; and
b. Upon installation or guarantee in accordance with section 14.04-3.050, to
proceed with the preparation of a final or bonded final plat.
6. Preliminary plat approval shall not aut horize the applicant to sell or otherwise
transfer lots or parcels.
G. Step 7: Applicant submits final or bonded final plat.
1. Final plat approval is an administrati ve action and does not require planning
commission action. No public notice or h earing is required for approval of the
final plat.
2. Applicants shall submit to the director f our copies and a digital PDF version of
the final plat drawn to the requirements of the Minimum Standards Manual for the
Practice of Land Surveying in South Caro lina, the final plat requirements of
article 14.04-4, and the required fee.
3. The final or bonded final plat shall show a ll streets and utilities in exact location,
identifying those portions already instal led and, where approved by the planning
commission, those to be installed and/or certified in the amount of improvement
guarantees required to assure completion of those improvements not yet installed
in accordance with section 14.04-3.050.
13
H. Step 8: Director review of final plat. The director shall review the plat for
compliance with the requirements of the a pproved preliminary pl at, this chapter,
chapter 14.08, and any other applicable regulations, and if found to be in compliance,
will instruct the applicant to prepare a fi nal plat for recording, including surveyor
certification.
I. Step 9: Applicant revision period. The applicant shall revise the plat in accordance
with the director's review. All necessary revisions shall be made prior to approval.
J. Step 10: Director approves final plat.
1. Following successful revision of the final plat by the applicant, the director shall
approve the final plat by obtaining the a pplicable signatures as required by
section 14.04-4.030.
2. Final plat approval shall be granted or denied within 45 days after submission of
a complete application to the director or within such further time as consented to
by the applicant.
3. No subdivision or land development pl at, portion, or phase thereof shall be
accepted for filing by the register of deeds until it has been approved by the
director, and so indicated on the plat by the signature of the authorized agent. No
such signature shall be affixed to the pl at until the developer has completed all
required improvements or has posted a letter of credit and agreement in
accordance with section 14.04-3.050.
4. Final plat approval sha ll confer upon the applicant the following rights:
a. To record the plat with the register of deeds within six months of final plat
approval; and
b. To proceed with the sale and/or transfer of lots and parcels.
5. If the final plat is not recorded within six months, then it shall become void.
14.04-3.050. - Financial guarantees.
A. General.
1. Financial guarantees may be posted in lieu of completing improvements required
by these regulations to the bonding of a s ubdivision project prior to bonded final
plat approval and shall authorize the sale, c onveyance, or transfer of lots within the
subdivision, in addition to the use of the lots as legal building sites.
2. Acceptance of financial guarantees is di scretionary and the county reserves the
right to refuse a financial guarantee fo r any remaining improvements and require
that such improvements be completed before the recording of a bonded final plat or
issuance of building permits. Acceptance of a financial guarantee by the county
14
shall not to be construed as an obligati on to any other agenc y, utility or property
owner within affected developments.
B. Submittal.
1. A cost estimate prepared by a licensed engi neer for financial gu arantees shall be
submitted to the director and follow the procedures enumerated below. Failure to
follow these procedures may delay the appr oval of such guarantee and recording of
a bonded final plat or issuance of building permits.
2. An itemized cost estimate shall be submitted for the improvements that the
financial guarantee will cover. Such estimate shall bear the original signature of the
estimator, be on company letterhead, and be in a form acceptable to the director.
Cost estimates may include, but are not limited to, the following:
a. Water and sewer systems.
b. Storm drainage systems and erosion control measures.
c. Street improvements including curbs, gu tters, sidewalks, pavements, temporary
cul-de-sac turn-arounds, and required grassing or landscaping within rights-of-
way or easements.
d. State road right-of-way improvement s upon agreement between the county and
the state department of transportation.
e. Street monuments.
f. Street intersection lighting.
3. The director will determine if the proposed cost estimate is consistent with the
prevailing costs for construction materials and determine if the cost estimate is
acceptable as a financial guarantee for the proposed amount, and if so determined,
it may be submitted.
C. Acceptance of financial guarantees.
1. The director and county finance departme nt may accept a letter of credit as a
financial guarantee to ensure the comple tion of public improvements in accordance
with the requirements enumerated below.
2. Approved guarantees shall be indepe ndent of the development project's
construction loan. The director will not accept any guarantee that requires draw-
downs for monthly expenditures. Payment of monthly expenditures is the sole
responsibility of the developer and does not affect the amount of money held by the
county.
3. Approved letters of credit shall adhere to the following standards. See article 14.04-
7 for an example letter of credit.
15
a. Be equal to 125 percent of the approved cost estimate.
b. Be issued for an initial coverage period not less than 12 months from the date
that the final plat is submitted for recording.
c. Be irrevocable, uncondi tional and subject to presen tation for drawing within
the state. Upon consent of the issuing institution and the county finance
department, facsimile drawing may be permitted. In no instance shall a letter of
credit only include a facsimile number for the purpose of potential drawing.
d. Be payable to Colleton County.
e. The original letter of credit shall be submitted. All originals are the property of
the county with all signatures in blue ink.
4. Renewals for letters of credit may be made upon approval of the planning
commission. Once approved, all renewals must be presented and accepted by the
director and finance department no later th an 30 days prior to expiration. Failure to
adhere to this deadline will require the im mediate draw on the original letter of
credit.
14.04-3.060. - Commercial development projects.
A. Commercial development site plan required. No building permit shall be issued for
a commercial development unless and until an applicant for such use submits to the
director the following:
1. A site plan with date an d scale, showing the actual sh ape and dimensions of the
lot to be built upon; the size, height, and location on the lot of existing and
proposed buildings and structures; the intended use of each building, the number
or units the building is designed to accommodate; landscaped areas; flood and
wetland areas; all proposed on-site signage showing locations; proposed
parking, driveways, and interior circul ation pattern; buildi ng elevations; and
contiguous off-site development.
2. Stormwater plan.
3. Tree survey.
4. Copies of permits required and obtained from other state and local agencies,
where requested.
B. Commercial development site plan submittal requirements.
1. Three full-size paper copies (additional prints shall be provided when deemed
necessary).
2. Digital copy in PDF format.
16
C. Project design criteria.
1. The director shall evaluate the applica tion in relation to the following design and
improvement criteria:
a. The commercial development project is consistent and compatible with the
comprehensive plan.
b. All of the requirements of chapter 1 4.08 and other applicable regulations are
met.
c. Ingress and egress to the project site shall be designed to maximize
automotive and pedestrian safety and facilitate traffic flow.
d. Off-street parking, off-str eet loading, refuse, signage, and service areas shall
be designed to minimize their visual and physical impact on neighboring
property.
e. Street right-of-way, sidewalks and pa vement construction shall be adequate
to accommodate the type and volume of traffic anticipated.
f. The project shall be designed in harmony with its physical surroundings and
in such a manner as to ensure land use compatibility.
g. Where the project will create a need for off-site improvements, including
improvements to streets, drainage systems, sidewalks, and curbs, the
director may require the installation of such improvements as a condition of
approval.
h. If, upon review of these standards, th e project is determined to be in
compliance, the director shall approve the land development application and
cause the issuance of a building permit.
2. Any proposed changes to an approved project shall be resubmitted and
reevaluated in light of the above.
ARTICLE 14.04-4. - SUBDIVISION PLAN REQUIREMENTS
Sections:
14.04-4.010. - Purpose.
14.04-4.020. - Sketch plan submittal requirements.
14.04-4.030. - Plat submittal requirements.
14.04-4.040. - Construction drawing requirements.
14.04-4.010. - Purpose.
The purpose of this article is to establish th e requirements for plat and plan submittal for
subdivisions in accordance with the proc esses set forth in article 14.04-3.
17
14.04-4.020. - Sketch plan submittal requirements.
A. Sketch plan submittal requirements. If the applicant chooses to submit a sketch plan
for review, then three copies and a digital PDF version of the sketch plan shall be
provided.
B. Plan labeling . A sketch plan shall be scaled and show the approximate proposed
layout of streets, lots, buildings, la ndscaping, signage, open spaces, and other
features in relation to existing conditions (the director may waive any information
required by this section). It shall also include the following information:
1. Name of the proposed development.
2. North arrow.
3. A vicinity map including north arrow.
4. Boundaries of the tract and the portion of the tract to be subdivided.
5. Parcel number(s) of the lo t(s) to be subdivided.
6. Adjacent property owners and tax map numbers.
7. Zoning classification of the trac t and of adjacent properties.
8. Total acreage to be subdivided.
9. Estimated and proposed uses of the land within the s ubdivision and the existing
uses of land adjoining it.
10. Existing and proposed road layout with approximate pavement and right-of-way
width, lot layout and size of lots.
11. Name, address, email address, a nd telephone number of the owner.
12. Roads and lots of adjacent de veloped or platted properties.
13. Existing topographic conditions of the property.
14. Watercourses, floodplains, and preserved areas.
14.04-4.030. - Plat submittal requirements.
A. Preliminary plat submittal requirements for major subdivisions only.
1. Twelve full-size paper copi es (additional prints shall be provided when deemed
necessary)
18
2. Digital copy in PDF format.
B. Major and minor final plat submittal requirements.
1. Four full size paper copies for review.
2. Digital copy in PDF format.
C. Plat labeling requirements for preliminary and final plats.
1. Labeling matrix. The preliminary and (bonded) final plats shall depict or
contain the information indicated in th e following matrix. An X indicates that
the information is required. Preliminary plat information is only required for
major subdivisions. Exempt subdivisions and subdivision of one lot into two lots
are only required to meet Minimum St andards Manual for the Practice of Land
Surveying in South Carolina.
Title Block Information: Preliminary
Plat
Final
Plat
a) Subdivision name x x
b) Name of owner x x
c) Name of the subdivi der/developer x x
d) Tax map number(s) x x
e) Location (including townshi p, county and state) x x
f) Bar graph scale and north arrow x x
g) Deed reference x x
Plat Preparation Information: Preliminary
Plat
Final
Plat
a)
All information required of genera l property surveys, in accordance
with the Minimum Standards Ma nual for the Practice of Land
Surveying in South Carolina, as promulgated by S.C. Code 1976, title
40, chapter 21.
x x
b)
Names and addresses of all owners, mortgagees, registered land
surveyors, land planners, architect s, landscape architects, utility
planners, and professional engineers responsible for the subdivision.
x x
Property and Site Calculation Information: Preliminary
Plat
Final
Plat
a) Vicinity map with north arrow s howing the relationship between the
proposed subdivision and surrounding area x x
b) Corporate limits, extraterritorial jurisdiction and county lines if on x x
19
the subdivision tract
c) Boundaries of the tract or portion thereof to be subdivided, distinctly
and accurately represented with all bearings and distances shown x
d)
Exact boundary lines of the tr act to be subdivided, fully
dimensioned by lengths and bearin gs, and the location of existing
boundary lines of adjoining lands
x
e) Adjoining property informati on including owner name, zoning
classification, and subdivision name x x
f) Minimum building setback lines x x
g) Zoning classifications of the tract(s) to be subdivided x x
h) Total acreage in the trac t to be subdivided x x
i) Acreage in parks and recreation and open space areas and other
nonresidential uses x x
j) Total number of pa rcels created x x
k) Acreage in the smallest lot in the subdivision x x
l) Linear feet in roads x x
m) Existing structures, watercourses, railroads, bridges, culverts, storm
drains x x
n) Proposed lot lines, lot and block numbers, and approximate
dimensions x x
o) The lots numbered consecutively throughout the subdivision in a
manner using only numeric symbols x x
p) Marshes, swamps, rock outcrops, ponds or lakes, streams or stream
beds and any other natural features affecting the site x
q)
The location of all special flood hazard areas, floodways and
floodway fringe areas from the county's official flood maps, and
community panel number if applicable
x x
Streets, Infrastructure, and Open Space Information: Preliminary
Plat
Final
Plat
a) Right-of-way location and dimensions x x
b) Road surface width x
c) Road profiles x
d) Existing and platted roads on ad joining properties and in the
proposed subdivision x x
e) Approved E911 Road names (Sheriff's Office) x x
20
f) Type of road dedication; all ro ads must be designated either
"public" or "private". x x
g) Utility plan showing pr oposed connections x
h) Drainage, access-way, and utility easement locations and
dimensions x x
i) Fire hydrants, if applicable x
j) Drainage plan and calculations (See section 14.04-5.070(L)) x x
k) Buffer strips (where applicable) x x
l) Pedestrian or bicycle pa ths (where applicable) x
m) Open space areas (where applicable) x x
n) Areas to be used for purposes other than residential with the
purpose of each stated with dimensions. x x
Agency Approvals: Preliminary
Plat
Final
Plat
a) SCDOT approval of driveway permits and road construction
drawings (where applicable) x
b) DHEC-Health (septic or engineered system approval)
(Subdivisions of eight lots or less are exempt) x x
c) SCDHEC/OCRM Stormwater approval (see section 14.04-
5.070(L)) x
d) US Army Corps of Engineers approval for wetlands x
e) City of Walterboro or othe r applicable utilities x
f) All certifications required below x x
2. Certificates and statements for preliminary plats.
a. Certificate of survey and accuracy. As required by the Minimum Standards
Manual for the Practice of Land Surveying in South Carolina.
b. Certificate of approval for major s ubdivision preliminary plats only. I
hereby certify that the preliminary plat for the major subdivision shown hereon
has been found to comply with the Land Development Regulations of Colleton
County, South Carolina, and that this plat was approved by the planning
commission on ____________ / ____________ / ____________.
_____ _____
Date Director of Pl anning and Development
3. Certificates and statements for final plats.
21
a. Certificate of ownership and dedication. I (We) hereby certify that I am (we
are) the owner(s) of the property shown and describe d hereon and that I (we)
hereby adopt this plat of subdivision w ith my (our) free consent, establish the
minimum building lines, and dedicate all streets, school sites, recreation areas,
and other public services and facilities as noted on this plat.
_____ _____
Date Owner
b. Certificate of survey and accuracy. As required by the Minimum Standards
Manual for the Practice of Land Surveying in South Carolina.
c. Certificate of approval stamp by the director of planning and
development.
14.04-4.040. - Construction drawing requirements.
A. Construction drawing submittal requirements.
1. Construction drawings for major s ubdivisions and commercial developments
larger than two acres shall be submitte d after the existing conditions survey
(section 14.04-5.030) is approved by the director.
2. Two full sets and a digital PDF version of sealed construction drawings shall be
submitted with the major subdivision prelim inary plat, or the final plat for all
other subdivisions.
3. Construction drawings shall be prepared for al l required improvements by a
registered South Carolina engineer at a convenient scale of not less than one
inch equals 100 feet.
B. Construction drawing labeling requirements. Construction drawings shall include
the following information:
1. Profiles showing existing and proposed el evations along the ce nter lines of all
new roads. The elevation along the center line of exis ting roads shall be shown
within 100 feet of their intersection with new roads. Radii of all curves, lengths
of tangents, and central angles on all streets shall also be shown;
2. Plans and profiles showing the locations and typical cross section of street
pavements, including curbs and gutters, sidewalks, drainage easements, rights-
of-way, manholes, and catch ba sins; the locations of street trees , street lighting
standards, and street signs; the location, size, and invert eleva tions of existing
and proposed sanitary sewers, stormwat er drains, and fire hydrants, showing
connection to any existing or proposed ut ility systems; and exact location and
size of all water, gas, or other underground utilities or structures;
3. Location, size, elevation, and other appropriate desc ription of any existing
facilities or utilities, including, but not limited to, existing streets, sewers, drains,
22
water mains, easements, water bodies, streams, and other pertinent features such
as swamps, railroads, buildings, at the poi nt of connection to proposed facilities
and utilities within the subdi visions. The water elevations of adjoining lakes or
streams at the date of the survey, and the approximate 100-year flood elevations
of the lakes or streams. All public water and/or public sewers are to be installed;
4. The acreage of each drainage area a ffecting the proposed subdivision;
5. Topography at a contour inte rval of two feet, referred to sea level datum when
public water and/or public sewers are to be installed;
6. All specifications and references re quired by the construction standards and
specifications of the county, any othe r local government providing any utility,
and the SCDHEC and the SCDOT;
7. A site grading plan showing proposed fi nished contours when any major contour
changes or filling for flood protection are proposed in the subdivision; and
8. Title, name, address, telephone, and signature of South Carolina licensed
professional engineer and/ or surveyor responsible for the plans and date,
including revision dates.
ARTICLE 14.04-5. - SUBDIVISION DESIGN STANDARDS
Sections:
14.04-5.010. - Purpose.
14.04-5.020. - General provisions.
14.04-5.030. - Environmental assessment and suitability of land.
14.04-5.040. - Lots.
14.04-5.050. - Open space requirements.
14.04-5.060. - Easements.
14.04-5.070. - Road standards.
14.04-5.080. - Utilities standards.
14.04-5.090. - Emergency management.
14.04-5.100. - Surveying and markers.
14.04-5.110. - Construction procedures.
14.04-5.010. - Purpose.
The purpose of this article is to establ ish the requirements for subdivision lot
configuration, lot access, road way layout, easements, and util ities to ensure sustainable
and adequate subdivision design.
14.04-5.020. - General provisions.
23
A. Each subdivision shall cont ain the improvements specified in this article, which shall
be installed in accordance with the requireme nts of this chapter and paid for by the
developer, unless other means of financing are specifically approved.
B. Land shall be dedicated and reserved in each subdivision as specified in this article.
C. Each subdivision shall be constructed in accordance with any county, state and
federal regulation or permitting requirement where applicable.
D. The name of the subdivision and the name s of the roads within the subdivision shall
not duplicate nor closely approximate the na me of an existing subdivision, nor any
existing roads within the county.
E. Design standards set out in this chapter may be waived or modified for PDDs
provided that the intent of these regulations is not nullified or lessened and provided
that sufficient proof is give n substantiating the adequacy of the alternative design
and given that the requirements of PDDs within chapter 14.08 are met.
14.04-5.030. - Environmental assessment and suitability of land.
A. Preservation of trees and natural featur es for commercial developments and major
subdivisions.
1. Significant forest stands, specimen/prot ected trees, severe topography, drainage
features and watercourses shall be preserved where reasonable and practical
while not reasonably prohibiting development.
2. Forested and vegetated areas whose settings render them unsuitable for
development should be used as conservation or open space areas. When portions
of wooded sites and forested stands must be developed, consideration should be
given to preserve wooded perimeters and/or the most desirable features to retain
the aesthetic character of the site. Isolated pockets of existing trees or
specimen/protected trees shall be protected whenever possible.
B. Existing conditions survey. Existing conditions survey s are required at the
preliminary plat stage for major subdivisions and commercial developments larger
than two acres prior to submittal of the s ite construction plans. Existing trees, known
endangered species, wetlands, streams, creeks, floodplains , dams, potential locations
for community wells, and topographical feat ures shall be identi fied prior to the
construction site plans to enable the preser vation of distinctive natural features and
protection for previously documented endangered species habitats.
24
FIG. 5.1 EXAMPLE OF AN EXISTING CONDITIONS SURVEY*
*Figures 5.1 and 5.2 Source: Southeastern Wisconsin Regional Planning Commission
(SEWRPC). "Conservation Subdivision Design." 2002.
C. Flood damage prevention.
1. For areas located within a special flood hazard ar ea (SFHA) or floodway, the
requirements of chapter 13.12, pertaining to flood damage prevention, shall be
met to minimize flood damage to propert y, buildings and structures and public
utilities and facilities.
2. Base flood elevation data shall be pr ovided for subdivisions and commercial
developments in accordance with ch apter 13.12, section-4.030, standards for
subdivision proposals.
3. If the area being developed, or any part thereof, is located within the boundary
of a designated SFHA or floodway, as delineated on FEMA maps for the
county, adequate plans and specifications for protection from flooding shall be
provided as herein required:
a. Any subdivision or commercial devel opment which contains land subject to
flooding shall be accompanied by evidence that no appreciable expansion of
the area subject to flooding would result from the proposed land
development, and that the proposed development will be adequately
protected from inundation without appreciable interference with the flow of
any watercourse or into an impoundi ng basin (approved drainage plan or
separate engineer certification will fulfill this requirement).
b. In no case shall any fill, levee, or other protective works be approved unless
sufficient compensating adjustments of waterways, ditches, or impounding
25
basins are made to prevent any appreciable expansion of flood hazard areas,
as determined by a licensed professional engineer.
c. The centerline of all streets should be at least on the ten-year flood line.
D. General safety.
1. Land which has been determined by the director, based on engineering or other
expert surveys, to pose a danger to life or property by reason of its unsuitability
for the use proposed, shall not be platted for that purpose, unless and until the
developer has taken the necessary measur es to correct and/or eliminate said
dangers.
2. Areas that have been used for disposal of solid waste shall not be subdivided
unless tests by the county he alth department, a structur al engineer and a soils
expert determine that the land is suitable for the proposed use.
3. Areas previously used for domestic sl udge application shall have a soils test
performed by a certified testing laborato ry prior to subdivision or development
which must confirm that the land is safe for the proposed use.
14.04-5.040. - Lots.
A. Lot size.
1. Minimum lot size requirements and setback s are contained in chapter 14.08. It is
not permitted to average the lot areas in a subdivision to meet the minimum lot
area requirements. However, conserva tion subdivisions shal l be allowed in
accordance with the requirements of section 14.08-3.020(H). See figures 5.2 and
5.3 below for examples.
FIG. 5.2 CONVENTIONAL SUBDIVISION EXAMPLE*
26
FIG. 5.3 CONSERVATION SUBDIVISION EXAMPLE*
2. All lots shall be accessible by a public street, except for:
a. Lots in an approved PDD, as provided for in chapter 14.08;
b. Lots on approved private access easements; and
c. Lots in new subdivisions with private street(s). All private streets must meet
the requirements of section 14.04-5.070(K).
3. Emergency responders and public utilities shall be uninhibited and have access
to all lots by their emergency response vehicles fire trucks and public utility
vehicles.
4. Lot size, width, depth, shape, grade, and orientation shall be in proper relation to
street and block design, to existing a nd proposed topographical conditions, and
for the type of development and use contemplated.
5. Residential subdivisions involving new public streets, where proposed for areas
adjacent and parallel to primary state and federal highways, shall be denied
direct access to and separated from such highways by double or reverse frontage
lots. Elsewhere, double fr ontage lots shall be prohi bited. Residential reverse
frontage lots shall have a minimum rear yard of 50 feet, next to the arterial street
or highway, measured from the shortest di stance of the proposed back building
line to the street right-of-way and shall within such rear yard and immediately
adjacent to the right-of-way, have a non-access planting screen easement at least
20 feet deep.
6. Side lot lines shall be a ligned at approximately right angles to straight street
lines and radial to curved street lines.
7. Following are the requirements for flag lots created from an existing lot of
record.
27
a. Flag lots are not permitted in the suburban residential (RS) zone.
b. The original lot must meet all zoning requirements specified for the
respective zone in which it is located, both before and after subdivision.
c. The maximum flagpole length shall be 300 feet.
d. The minimum flagpole width shall be 30 feet with a ten-foot curve radius
on each side on an approved private or public road, with a minimum of fifty
feet (50’-0”) of frontage at the right-of-way.
e. The front setback shall be measured from where the lot meets the district
minimum width requirements.
f. The flagpole portion of the lot is not used to calculate area, width, or
setbacks of the lot or to provide off-street parking.
8. Flag lots created in new subdivisions.
a. All requirements in subsection A.7 of this section, except subsection A.7.c.
b. Flag lots in new subdivisions are permitted only in the RC-1, RC-2, RD-1,
RD-2 and UD-2 zones.
c. Flag lot access driveways, single or combined, shall be separated by a
minimum of 100 feet.
d. Not more than two flag lot access driv eways can connect at any one point.
28
e. Any minor or major su bdivision with more than 25 percent of the total
number of lots as flag lots requires planning commission approval.
f. When a flag lot has less than 50 feet of road frontage a nd is less than two
acres, the pole portion of the lot cannot exceed 400 feet.
14.04-5.050. - Open space requirements.
A. Applicability. The requirements of this section apply to multifamily projects and
mobile home parks consisting of seven or more units or land subdivisions of 100
dwelling units or more in the RS, UD-1, a nd UD-2 districts. Subdivisions with all
lots being five acres or more are exempt from this provision.
B. General provisions for open space.
1. Land designated as open space on the approved development plan shall be
maintained as open space and may not be separately sold, subdivided, or
developed.
2. Access from a public street shall be provided to all de signated open spaces with
a minimum 15-foot-wide access including la kes or ponds within the subdivision
used as open space.
3. Open space shall be contiguous wherever possible.
4. The county comprehensive plan and other plans, particularly park and open
space plans, shall be considered when evaluating proposals for dedication.
C. Minimum open space dedication.
1. A minimum of five percent of the tota l development area for subdivisions shall
be dedicated as open space, and 15 per cent shall be dedicated for all other
projects.
2. Conservation development minimum open space dedication shall meet the
requirements of section 14.08-3.020(H).
D. Types of open space. The developer has the option to choose the types of open space
dedicated for the development to satisfy the minimum open space requirements for
this section. Dedicated ope n space shall fit into one or more of the following
categories and be classified as private common area or public open space. The
existing conditions survey (if required by section 14.04-5.030(B)) should be used as
a guide to determine the most appropriate open space type and location.
1. Playground. Playgrounds are for active recreatio nal use and provide play areas
and equipment for children as well as shelters with benche s. Playgrounds may
also be part of other types of open space, such as parks.
Minimum size: 10,000 square feet.
Maximum size: 20,000 square feet.
29
2. Square. Squares are areas for passive recreational use. Squares are encouraged
to be entirely bounded on all sides by stre ets, but they can be bounded by streets
on at least 50 percent of their perimete r. Squares shall have canopy trees
planted along all street frontages.
Minimum size: 2,000 square feet.
Maximum size: one acre.
3. Park. Parks may be for passive or activ e recreational use and be bounded by
streets on at least ten per cent of their peri meter. Large parks should create a
central open space which services an enti re neighborhood; or incorporates
physical features which are an asset to the community (i.e., lake or river
frontage, high ground, significant stands of trees). Undergrowth should be
limited with landscaping installed that promotes attractiveness and safety. Parks
may be combined with greenways and greenbelts and may include golf courses
and community gardens.
Minimum size: one acre.
30
4. Greenway. Greenways are large, irregular open spaces designed to incorporate
natural settings such as creeks and significant stands of trees within and between
neighborhoods. Greenways are typically mo re natural and may contain irregular
topography. Greenways shall in corporate active recreationa l uses such as, trails
for walking, jogging, and biking. Greenways shall connect points of interest in
the community.
5. Nature preserve. Nature preserves shall be left largely undisturbed except for
the optional clearing of unde rbrush for a walking trail (mulch or other natural
material only). Nature preserves are encour aged to protect large stands of trees,
wildlife, and natural water features, a nd they are the preferred form of open
space for steeply sloped terrain.
Minimum size: three acres.
E. Open space ownership and maintenance.
1. Open space may be owned by any legal m eans, and the owner(s) are responsible
for the proper and continued upkeep a nd maintenance of the dedicated open
space into perpetuity.
2. The developer shall place in a conspicuous manner upon the final plat a notation
concerning control of the open space.
31
3. The developer shall provide proof of regi stration of the articl es of incorporation
with the appropriate state agency fo r the formation of the homeowners'
association to the director.
4. Homeowners' associations or similar le gal entities (HOAs) responsible for the
maintenance and control of open spaces and common areas shall be established
by the developer who shall r ecord in the register of deeds a declaration of
covenants and restrictions that will govern the HOA prior to any final or bonded
final plat approval. A copy of the reco rded document shall be provided to the
director and such document shall at a minimum, include the following:
a. Provision for the establishment of the HOA is required before any lot in the
development is sold or any building occupied and membership shall be
mandatory for each current and future homeowner.
b. The HOA has clear legal authority to maintain and exercise control over
such common open space areas.
c. The HOA has the power to compel c ontributions from all homeowners to
cover their proportionate shares of the costs associated with the
maintenance and upkeep of such common areas. Further, assessments levied
can become a lien on the property if allowed in the master deed establishing
the HOA.
d. The open space restrictions must remain permanent into perpetuity, and not
just for a period of years.
e. The HOA must be responsible for liability insurance, applicable taxes and
the maintenance of open space and other facilities under their control.
f. The HOA must be able to adjust th e assessment to meet changing needs.
g. The HOA shall be responsible for maintaining all pub lic storm water
drainage systems and easements within the subdivision not being
maintained by the county, state or other approved entity.
h. It shall be expressly stated within the restrictive covenants/HOA documents
that it will be the responsibility of th e developer or successo rs or assigns to
enforce such covenants or restrictions until such time as control has been
transferred to the HOA board of directors. It shall be the sole responsibility
of the developer, successor or assigns to correct any deficiencies prior to
transfer of control over to the HOA board of directors.
F. Payment in lieu of open space dedication.
1. If open space within a development is physically impractical due to unusual
conditions then the county may accept a fee paid in lieu of dedication.
32
2. Fees collected in lieu of dedications a nd any proceeds from such transactions or
sales shall be accounted for by the count y finance department, and the funds
shall be used by the county for the purposes of acquiring and developing
recreation, greenway and open space areas as encouraged in the comprehensive
plan or in any parks and recreation and greenway/bikeway master plans, and for
no other purposes. The depository for such funds may be the same as permitted
other funds of the county, pending thei r expenditure in a ccordance with the
terms of this code; such funds may be invested as other funds of the county. The
county may, at its discretion, add additiona l monies to the fund for the purposes
of purchasing open space and recreational land to be used for recreational
purposes.
3. Refunds shall not be granted to th e developer should the project not be
constructed after recording of final plat or if a reduction in density occurs.
4. Such payment in lieu of dedication sh all be the product of the current assessed
market value of the land to be subdivi ded (as established in subsection F.5
below) multiplied by the number of acres to be dedicated.
5. The current assessed market value of th e gross land area of the development or
subdivision at the time of submission of th e required plan and/ or plat shall be
used to determine the land value. The current assessed market value shall be the
appropriate value as determined by a nd maintained on f ile in the county
assessor's office. The average value per gr oss acres shall be calculated from this
total value and applied to the required recreational land area in order to
determine the land value.
Total market value of undeveloped property
x Acres of required open space = Payment
Total acres of undeveloped property
14.04-5.060. - Easements.
A. Drainage easements. Drainage easements shall be provided whenever a development
contains a watercourse, drainage-way, cha nnel, or stream, conf orming with the lines
of such watercourse, and not less than 15 feet wide or of sufficient width, as
determined by the county engineer, to carry off stormwater and allow for
maintenance and improvements.
B. Utility easements . Utility easements, where required, shall be not less than 15 feet
wide. The location of utility easements shall be coordinated with the utility provider.
C. Private access easements . Private access easements are permitted only in the RC-1,
RC-2, RD-1, RD-2 and UD-1 districts, provided:
1. The easement shall be not less than 30 feet wide with a minimum of fifty feet of
frontage onto a public right-of-way;
33
2. The easement shall provide access to onl y one lot, except in subdivisions of
three lots or less in which all lots are at least one acre in size;
3. The lot(s) to be accessed must be subdivid ed separate and apart from the lots for
which the easement is being provided, and not run through these lots; and
4. Access Easements are exempt from the requirements of section 14.04-5.070,
road standards.
D. Maintenance of easements.
1. All easements are owned and shall be maintained by the property owner and no
structures or trees may be placed within an easement. Easements may be used
to satisfy yard and building setback requirements.
2. Covenant restrictions placed on a lot whic h contains an easement shall stipulate
that the county, service provider or u tility company shall have full right of
access to said easement;
3. The county shall maintain only those eas ements specifically accepted for public
maintenance and use.
14.04-5.070. - Road standards.
A. Relationship to transportation plan. The provision of road rights-of-way shall
conform to the requirement s of the SCDOT Statewide Transportation Improvement
Program (STIP) and Plans, the comprehens ive plan, and any other adopted county
transportation plans.
B. General provisions.
1. New streets in major subdivisions “shall ” be, and streets in minor subdivisions
“may” be located within a platted public right-of-way dedicated to the county or
the SCDOT or within a platted private right-of-way deeded fee simple to a
specific HOA, POA, HPR, or similar entity.
2. The design criteria contained in this s ection applies to roads to be accepted into
the county road maintenance system which shall be constructed to comply with
the design standards required by SCDOT.
3. Street systems shall be designed to permit the safe, efficient, and orderly
movement of traffic; to have a simple and logical pattern; to respect natural
features and topography; to present an attractive st reetscape; and to permit
linkage of major collector streets and subdivisions.
4. Proposed streets shall be coordinated w ith the surrounding area’s existing road
network, where possible, to provide fo r the continuation of existing streets
abutting the development.
34
5. All streets shall be opened to the exte rior property lines of the development
unless permanently terminated by a cul- de-sac or intersec tion with another
street.
6. Reserve strips controlling access to public streets are prohibited except where
their control is approved by county council, under c onditions approved by the
planning commission.
7. No half streets shall be permitted.
8. For new developments, the minimum rights-of-way shall conform to the design
standards established herein. Developm ents encompassing an existing county
road shall provide the standard right -of-way required herein. Developments
located on only one side of an existing county road, sh all provide half of the
required right-of-way, measured from the centerline of the existing road.
9. Access/driveway permit required. It is the responsibility of the owner of any lot
fronting onto a state-maintained highway to obtain an SCDOT encroachment
permit to create access, and for any lot fronting on a county-maintained road to
comply with the policies adopted by the county department of roads and bridges
to create access.
C. Subdivision access. The planning commission may a llow alternatives where access
points cannot meet the minimum separati on distance required by the SCDOT
regulations.
D. Alleys. Paved alleys are recommended in commercial and industrial developments for
service access, off-street loading and unl oading, and parking adequate for the use
proposed. Paving is optional for residential a lleys. See subsection J of this section for
alley width requirements.
E. Culs-de-sac.
1. Dead-end streets designed to be closed at one end shall not exceed 1,700 linear
feet measured from the right-of-way centerline to the center point of the
turnaround with turnaround points every 800 feet.
2. Turnarounds shall have a minimu m turning radius of 50 feet.
3. When a stub-out or temporary dead-end street is created as a result of
development phasing, a temporary all weat her surfaced 50 foot turning radius
turnaround shall be required when the dead-end street exceeds 150 feet.
F. Intersections.
1. No more than two streets sha ll intersect at any one point.
35
2. All streets shall intersect as nearly as possible at 90-degree right angles.
3. Streets entering upon opposite sides of a gi ven street shall have their center lines
either directly opposite or offset a mi nimum distance of 2 00 feet, measured
between the centerlines of the streets.
4. Street intersections shall be located at least 200 feet from the right-of-way of
any railroad track, measured from the center point of the intersection to the
railroad right-of-way line nearest the intersection.
G. Connectivity. Where deemed necessary and beneficial for interconnectivity of
developments, proposed public roads shall be extended by dedication to the boundary
of the developing property a nd a temporary turnaround prov ided in compliance with
subsection E.3 of this section. The road shall be designated a nd constructed as a
public road except when it is determined that:
1. Physical barriers or environmentally sensitive areas to be crossed exist, such as
railroads, watercourses, steep topography, or flood areas.
2. There is a large discrepancy in the size of the adjacent parcel . (A smaller parcel
being subdivided may not have to provide a stub to a much larger parcel, if
other, more desirable, interconnections are available to the large parcel.)
3. The stub road would connect to property designated for a public purpose and
access to the property is not desirable for orderly development of the road
network.
4. The stub road, if extended, would cause the existing road(s) to exceed the
capacity allowed on that roadway.
H. Road names and signs.
1. All proposed road names must be approved by Colleton County E-911
Addressing.
2. Design and placement of traffic signs shall conform to SCDOT standards.
Responsibility for installation shall rest with the developer.
3. At least two street name signs sha ll be placed at each four-way street
intersection, and one at each "T" inte rsection. Signs shall be installed under
streetlights, where possible, and free of visual obstructi on. The design of street
name signs shall be approved by the sheriff's office.
I. Sidewalks. Sidewalks are optional but recomme nded. The following shall apply if a
developer chooses to install sidewalks:
1. When a major subdivision lies within 1,500 f eet (property line to property line)
of an existing public school, library, or park, or where an adjoining subdivision
36
already has sidewalks in place, sidewalks should be on the same side of the
street as the existing sidewalks or on one side of any new or existing roads.
2. Sidewalks shall be a minimum of five f eet wide to meet ADA standards, and be
a minimum of four inches thick.
FIG. 5.4 SIDEWALK CONSTRUCTION
3. Sidewalks shall be placed in the righ t-of-way, unless a development plan calls
for a different location.
J. Public road construction standards.
1. The minimum street and right-of-wa y widths shall be as follows:
Street
Classification
Width
Right-of-Way Street/
Travelway
Minor street 50' 20'
Major street 66' 24'
Alley 20' 12'
37
2. All public streets and roads to be dedicated for public use shall be constructed in
accordance with the South Carolina St andard Specifications for Highway
Construction Manual.
3. Road dedication process.
a. Prepare a letter addressed to the County Administrator requesting the road
be accepted for County maintenance. Include with the letter the following:
i. Petition signed by all the propert y owners whose land adjoins the
road agreeing to the request.
ii. If it exists, a copy of a plat noting property ownership along the
road.
b. The County will reply by letter to the person making the request indicating
that an inspection was performed and what improvements are required
before the County can accept the road. The minimum design standards to
accept any road is as follows:
i. The minimum amount of land needed for any road is 50 feet. If the
roadway width including the draina ge ditches is less than 50 feet,
those property owners whose land is adjoining will have to give over
to the County enough land to meet the 50 foot requirement.
ii. The road must have the proper drai nage in place before it can be
accepted. This includes ditches, culverts, pipes or retention ponds.
iii. The roadbed is to be 28 feet wi de measured from shoulder to
shoulder and have a 2.5” crown to a llow for runoff into the ditches.
All ditches must have a 0.5% grade to outfall points.
c. If the road meets these standard s, the County Administrator will submit a
request to County Council for acceptan ce. Once approved, legal documents
at the property owner’s cost will have to be provided to the County
Administrator’s Office deeding the 50 foot road right-of-way to the County.
Once the deed is recorded at the Regi ster of Deeds Office, the road will
become a part of the county’s maintenance system.
d. If the road does not meet these standards, the property owners may choose
to improve the road to comply with the design standards themselves or pay
to the County the cost of improving the road, and permit the County to
perform the necessary work. At comp letion, the County Administrator will
request County Council ac cept the road in to the maintenance system
conditioned on the proper legal documents being submitted by the property
owners dedicating the road over to the County.
K. Private road construction standards.
38
1. Use and maintenance of private roads.
a. A private road is permitted by right in subdivisions with less than 50 lots.
Subdivisions with more than 50 lots shall be publicly owned and maintained
unless approval by the planning commission is granted at preliminary plat
review for conversion to private ownership and maintenance.
b. Roads within gated communities may be private roads, regardless of
number of lots. Access information shall be provided to emergency
personnel so that the community can be accessed in the event of an
emergency.
c. The guarantees of right of access and maintenance of private roads in the
subdivision shall run with the land. The guaranteeing instrument shall be
reviewed and approved by the director pr ior to approval of the final plat. A
verified certificate, signed by the owner of the subdivided land, attesting
these facts shall be placed on the final plat submitted for approval.
Example: Certificate of Subdivision Lots Accessed by a Private Road
Certificate of Private Road Maintenance and Disclosures
I, ____________, certify that an instrument will be recorded
simultaneously with the recordation of this approved final plat that
guarantees:
a. A right of access to any private road in the subdivision by all lots
served by the road; and
b. Maintenance of any private road in the subdivision at the standards
set for approval.
These guarantees of right of access and maintenance of the
subdivision roads shall run with the land.
______________ ___________
Owner(s) Date
2. Minimum construction standards for private roads.
a. General standards and specifications for private roads. All private roads
approved and constructed in the county must meet these general standards
and specifications.
Private Road Standards and
Specifications Requirements
Total Number of Lots 1 Served By the
Private Road
Less Than 50
Lots
Greater Than
50 lots Nonresidential
Right-of-way width 50 ft. 50 ft. 50 ft.
Travel-way width 18 ft. 24 ft. 24 ft.
39
Lane width 9 ft. 12 ft. 12 ft.
Private road surface/travel-way material Dirt, gravel,
or paved
Dirt, gravel,
or paved
Paved SCDOT
Standards
SCDOT road geometry and specifications Yes Yes Yes
Professional surveyor certification of road in
platted right-of-way required Yes Yes Yes
1 Total number of lots served shall include the residual acreage of the tract being
subdivided, where such residual acreage will be accessed by the private road.
b. Private road maintenance. Maintenance of the private road shall be provided
by the lot owners served by the road or an established HOA. A road
maintenance agreement and declaration between the lot owners is required
to insure the cost is shared, and a mechanism for maintenance is set up
where a homeowners association is not created. The responsibility for
maintenance is the property owners', and not the state nor the county.
c. Road maintenance agreement require ments. The developer shall have an
instrument recorded simultaneously with the final plat substantially in the
form of the county's standard road maintenance agreement in article 14.04-
7.
L. Stormwater drainage facilities.
1. The internal storm drainage system shall be designed to accommodate the
appropriate design storm based on the lo cation of the street/development. The
roadway drainage system (the road su rface, curb and gutter where provided)
must be designed for a ten-year storm return frequency design and shall follow
the design criteria as outlined in the South Carolina Stormwater Management
and Sediment Control Handbook (SCSMSCH), current edition, for all
unincorporated properties in the county.
2. Any off-site stormwater runoff ont o the proposed development must be
accommodated. Design parameters and coeffi cients used in all calculations for
off-site stormwater shall be based on the projected build-out of the basin. The
design storm shall be dictated by these standards with due consideration given to
downstream system capacity.
3. In general, ditches shall be constructe d to provide drainage from the road and
adjacent areas. The ditches shall be built with sufficient depth and width to carry
the expected volume of water. The side slopes shall be graded so they can be
stabilized and prevent vehicles from becoming stuck if they enter them.
4. All development shall be subject to the provisions of th e SCSMSCH, current
edition. Developers of any proposed co mmercial development or subdivision
must obtain a permit from the SCDHEC and OCRM offices, where required.
40
5. If an SCDHEC Stormwater permit is not required, then any residential
development with an overall density of two dwelling units per acre or higher and
all commercial developments require a drainage plan which meets OCRM
design standards. All other projects are exempt.
6. An approved OCRM drainage plan fulf ills the requirements of this section.
7. All drainage plans shall be certified by a South Carolina licensed professional
engineer.
14.04-5.080. - Utilities standards.
A. Community water and sewer (public and private).
1. All subdivisions and commercial devel opments shall be provided with water
supplies and sanitary sewer systems approved by the SCDHEC.
2. The water supply system shall be adequate to handle the domestic demand, plus
the fire flow, based on the completed development.
3. The sanitary sewer system shall be ade quate to handle the ne cessary flow based
on the completed development and peak usage.
4. Said facilities shall be "st ubbed out" prior to road surfacing.
5. If the subdivision is to have a water or sewer system other than one connected to
a public system, said systems are required to receive approval from the
SCDHEC prior to preliminary plat submittal.
6. Where a central water system is provi ded for a development, three-way fire
hydrants shall be installed by the de veloper in accordan ce with section 14.04-
5.090(A) with two 2½-inch and one 4½-inch fire department connections (NST).
7. Community water and/or sewer systems shall be installed prior to final plat
approval unless such installation is guaranteed in accordance with section 14.04-
3.050.
B. Wells and septic tanks.
1. A subdivision or commercial developmen t using individual septic systems
and/or wells shall conform to those requi rements as set forth by SCDHEC. It is
not required for a well or septic system to be installed prior to the sale of any lot.
2. A private septic system may be located off site for conservation subdivisions
provided that the location of such system is noted on the final plat as a septic
field utility easement.
C. Street lighting (optional).
41
1. Where street lighting is proposed, the following standards shall apply.
2. Street lighting shall be Light-Emitt ing-Diode (LED) where possible, and
provided at all public stre et intersections, and midw ay between intersections
located more than 800 feet apart; provide d such spacing shall not be less than
400 feet between streetlights.
3. The maximum height of stre etlights shall be 25 feet.
4. Street lighting shall be properly shielded so as not to create a hazard to drivers
or a nuisance to residents.
14.04-5.090. - Emergency management.
A. Fire hydrants.
1. Where sufficient water flow and pressure exist, as determined by the county fire
marshal and approved by the appropriat e water provider, the developer shall
install fire hydrants throughout each subdi vision or commercial development to
maintain a maximum 500-foot radius between hydrants, as approved by the fire
marshal.
2. Unless no practicable alte rnative is available, wa ter lines shall be looped
wherever possible and not contain dead -end lines for pressure and volume
equalization throughout the system.
B. Fire suppression requirements.
1. For any subdivision or commercial deve lopment without a fire suppression rated
water system, that has access to an ad equate permanent surface water supply
(100,000 gallon storage in a 50-year drought), the applicant shall install a dry
fire hydrant system. An all-weather access road for firefighting equipment shall
be provided by the applicant to this permanent surface water supply.
2. Where the subdivision or commercial de velopment is neither served by a public
water system nor has access to an adequate permanent surface water supply,
such systems shall be reviewed by the director and fire marshal to determine
alternative measures to ensure adequacy of fire protection.
14.04-5.100. - Surveying and markers.
All land developments within the jurisdiction of this chapter shall be surveyed, platted,
and marked in accord with the Minimum St andards Manual for the Practice of Land
Surveying in South Carolina, as promulga ted by S.C. Code 1976, title 40, chapter 21.
This manual is hereby adopted by reference and is as much a pa rt of this chapter as if
contained herein.
14.04-5.110. - Construction procedures.
42
A. No construction or installation or improvements shall commence in a proposed
subdivision or commercial development until the preliminary plat, existing
conditions survey, site plan and construc tion drawings have been approved by all
appropriate authorities.
B. No building, zoning or other permits shall be issued for erection of a structure in any
subdivision or commercial development until all the requirements of this chapter
have been met. The approving authorities ha ving jurisdiction or their representatives
shall inspect and approve all completed work prior to release of any sureties.
ARTICLE 14.04-6. - DEFINITIONS
Sections:
14.04-6.010. - Purpose.
14.04-6.020. - Interpretation.
14.04-6.030. - Acronyms.
14.04-6.040. - Definitions.
14.04-6.010. - Purpose.
For the purpose of interpreting chapter 14.04 and chapter 14.08, certain words, concepts,
and ideas are defined herein. Except as defined herein, a ll other words used in these
chapters shall have their everyday meaning as determined by their dictionary definition.
14.04-6.020. - Interpretation.
A. Words not defined herein shal l have the meanings stated in the Standard Building,
Plumbing, Electrical, Gas, or Fire Preven tion Codes. Words not defined in the
standard codes shall have the meanings in Webster's Tenth Edition Collegiate
Dictionary, as revised.
B. Words in the present tense include the future tense and vice-versa. Words used in the
singular include the plural, and vice-versa.
C. The terms "shall" or “must” are always mandatory.
D. The terms "may" or “can” are permissive.
E. The term "lot" includes the word "plot" or "parcel."
F. The term "person" includes a firm, asso ciation, organization, partnership, trust
company, or corporation, as well as an individual.
G. The term "planning commission" refers to the county planning commission.
H. The term "council" refers to the county council.
I. Any word denoting gender includes the female and the male.
43
J. The term "structure" shall include the word "building."
K. The term "street" shall include the word "road."
L. The term “zoning board of appeals” refers to the county zoning board of appeals.
M. The term “used” or “occupied” as applied to any land or building shall be construed
to imply that said land or building is in actual use or occ upancy and shall be
construed to include the words "intended," "arranged," or “designed” to be used or
occupied.
N. The term “map” or “zoning map” shall mean the official zoning map of Colleton
County, South Carolina.
14.04-6.030. - Acronyms.
Following is a list of acronyms (other than zoning districts) and their meanings found
throughout chapter 14.04 and chapter 14.08:
BFE Base flood elevation
DUA Dwelling units per acre
FEMA Federal Emergency Management Agency
FIRM Flood insurance rate maps
HOA Any legal type of Home Owners Association
ROW Right-of-way / Rights-of-way
OCRM Ocean and Coastal Resource Management
SC South Carolina
SCDHEC / DHEC South Carolina Department of Health and Environmental Control
SCDOT / DOT South Carolina Department of Transportation
US / USA United States of America
14.04-6.040. - Definitions.
The following words, terms and phrases, wh en used in chapter 14.04 and chapter 14.08,
shall have the meanings ascribed to them in this section, ex cept where the context clearly
indicates a different meaning:
Abutting means sharing a common border; physically touching.
Agricultural production/activity means land used exclusively as a bonafide
agricultural operation by the owner and/or te nant. The use of land for agricultural
purposes including farming, fish culture, b ees for honey production, animal and poultry
husbandry, and the necessary accessory uses fo r packing, treating, curing or storing the
44
produce or product, provided that the operation of the accessory use is clearly incidental
to the agricultural activity. Uses which shall not be classified as agricultural production
or uses, for the purposes of this chapter, include zoos, kennels, or riding stables and
academies.
Agricultural support services includes the operation, ma nagement, conservation,
improvement, and maintenance of a farm and the structures on the farm, including
building repair, replacement, expansion, and construction incidental to the farming
operation; and/or the marketi ng and selling of agricultural products, agro-tourism, the
storage and use of materials for agricultu ral purposes, packing, treating, processing,
sorting, storage, and other similar activities performed to add value to crops, livestock,
and agricultural items produced on the farm.
Airport elevation means the established elevation of the highest point on the usable
landing area.
Airport hazard means any structure, tree, or use of land which obstructs the airspace
required for, or is otherwise haza rdous to the flight of aircraft in landing or taking off at
the airport.
Airport reference point means the point establishe d and designated as the
appropriate geographic center of the airport landing areas.
Animal production means the dairying, raising, ma nagement, care, and training of
livestock, including horses, bees, poultry, and other animals for individual and public use,
consumption, and marketing.
Animal services means a public or private facility for medical or surgical treatment,
grooming, breeding, selling, or boarding of animals. Unless outdoor kennels are
specifically allowed, all facilities associated with animal servic es shall be located
indoors.
Automotive services means any building, premises, a nd land, in or upon which the
primary use of land is a business which involve s the maintenance, servicing or sale of
new or used automobiles, motorcycles, boa ts or other motor vehicles generally and
including recreation vehicles and any vehicle leasing, rental, parking service, preparation
or repair work conducted. The term "automotiv e services" includes bu t is not limited to
auto dealerships, auto body shops, auto servi ce stations, boat repair or sales, car washes,
convenience stores, gas stations, truck stops, and oil/lube servicing. This does not include
the sale of parts or related products (i.e., auto parts store).
Bed and breakfast inn means any owner-occupied dwelling or portion thereof
offering rooms and meals at breakfast to transient lodgers in return for compensation.
Buildable area means that portion of any lot wh ich may be used or built upon in
accordance with the regulations governing the zoning district within which the lot is
45
located when the front, side and rear yar d, open space, and applicable buffer area
requirements have been met.
Building/structure, accessory, means a subordinate structure on the same lot as the
principal or main building or use occupied or devoted to a use incidental to the principal
use. Included in this definition are privat e garages, storage sheds, workshops, animal
shelters, pool houses, etc., when detached from the principal buildings, and carports
attached to the principal building when at least 75 percent open or unenclosed.
Building/structure, alteration means any act or process th at changes or alters some
or all of the exterior architectural features of a structure, including, but not limited to, the
addition onto or reconstruction of any structure.
Building/structure, principal, means a building in which the main or principal use
is, or is intended to be conducted.
Campgrounds means land containing five or mo re campsites which are located,
established, or maintained for occupancy by pe ople in temporary living quarters, such as
tents, recreational vehicles, or travel trailers which are primarily used for recreation or
vacation purposes.
Canopy tree means a deciduous tree that forms the top layer of vegetation in a forest.
Examples of such trees include oaks, hickories, maples, and poplars, among others.
Cemetery, accessory, means a portion of property used for the interment of the dead.
An accessory cemetery is located at the site of another principal use such as a religious
institution or place of worship. A cemetery shall not be used for the preparation,
embalming or cremation of bodies.
Cemetery, family, means a family plot used for the interment of the dead of a family
member related by blood, marriage, or adop tion. A cemetery shall not be used for the
preparation, embalming, or cremation of bodies.
Cemetery, principal, means property used principally for the interment of the dead,
which use may include the commercial sale an d location of burial lots , plots, crypts, or
vaults for use exclusively on the subject property. A cemetery shall not be used for the
preparation, embalming, or cremation of bodies.
Certificate of occupancy (C of O) means a certificate issued by the building official
which certifies that a structure has been er ected in accordance with all applicable county
zoning, development and building codes, the e ffect of which shall permit the occupancy
of a building.
Certificate of occupancy, Temporary (TCO) means a temporary 30, 60 or 90-day
certificate issued by the building official which certifies that a structure has been erected
in accordance with all applicable county code s, which allows for the stocking of shelves,
46
furnishing of space, or installation of specia lized equipment prior to the final inspection
and issuance of the certificate of occupancy.
Commercial development means the changing of land characteristics through
development, redevelopment, and/or constr uction of any use other than single or two-
family residential is classified as a commer cial development, such as: apartments and
condominiums; commercial pa rks, centers, and subdivisions; industrial parks;
manufactured home and RV parks; and, simila r developments for profit, sale, lease, or
any combination having owner-rental characteristics.
Community sewer system means infrastructure to remove waste water within a
development that is not connected to a public sewer system where the lots are not on
individual septic tanks. Such systems shall be approved by the SCDHEC.
Community water system means infrastructure to deliver water within a
development that is not connected to a publ ic water system where the lots are not on
individual wells. Such systems shall be approved by the SCDHEC.
Conditional use means a use of land or structure, which is permitted in a zoning
district with conditions for approval, as specified in chapter 14.08.
Condominium means a unit in a multi-unit structure owned by an individual who has
shared use of all common areas associated w ith that structure with the other individuals
who occupy the same multi-unit structure.
Day care services means and includes any home, center, agency, or place, however
styled, where children, elderly, and other persons not related to the operator are received
for custodial care, apart from their pare nts, whether for compensation, reward, or
otherwise during part or all of the day and for any number of successive days.
Density means the number of dwelling units per acre of land developed or used for
residential purposes.
Developer means a person, individual, partnership, or corporation (or agent therefor)
that undertakes the activities covered by these regulations.
Development means any manmade change to real estate, including, but not limited
to, the construction of buildings or other structures, mining, dredging, filling, grading,
paving, excavation, or drilling operations.
Domestic animal shelter means a pen, shelter, or stru cture where no more than three
dogs or small domestic animals, not to include farm animals, such as horses, cows, goats,
swine including pot-bellied pigs, sheep, ponies, grazing animals, and fowl of any kind,
are boarded and kept.
47
Drainage means the removal of surface or groundwater from land by drains,
grading, or other means.
Driveway means a paved or unpaved area used for ingress and eg ress to a property
from a street or road by motor vehicles.
Dwelling means a building or portion of a building constructed for human habitation,
typically with cooking, sleeping, bathing, and toilet facilities.
Dwelling unit means a single unit that fits the description of a dwelling.
Dwelling, apartment. See Dwelling, multi-family.
Dwelling, detached , means a single dwelling unit, surrounded by open space or
yards and which is not attached to any other dwelling by any means.
Dwelling, duplex, means a single building containing two dwelling units.
Dwelling, multi-family , means a single building contai ning five or more dwelling
units.
Dwelling, patio house , means a single-family detached or semi-detached dwelling
unit. It is built on a small lot generally enclosed by walls, which provide privacy. The
term is synonymous with zero lot line dwellings.
Dwelling, quadruplex, means a single building containing four dwelling units.
Dwelling, residential designed manufactured home, means a single-family dwelling
unit built according to the Federal Manufact ured Housing Construction and Safety
Standards (245 CFR 3280) HUD Code, 6-15-76, and which:
1. Has a minimum width over 20 feet (multiple section);
2. Has a minimum of 900 square f eet of enclosed living area;
3. Has a minimum 3:12 roof pitch; and ha s a type of shingle commonly used in
standard residential construction;
4. Is covered with an exteri or material customarily us ed on site built homes,
including vinyl or aluminum lap sidi ng, wood, masonite, or other materials
similar to the exterior siding comm only used in standard residential
construction; and
5. Has a roof overhang of not less than eight inches.
Dwelling, single-family, means a single building containing one dwelling unit.
Dwelling, standard designed manufactured home , means a single-family dwelling
unit built according to the Federal Manufact ured Housing Construction and Safety
Standards (24 CFR 3280) HUD Code, 6-15-76, and which does not meet the definition of
a residential designed manufactured home.
48
Dwelling, townhouse , means a series of attached single-family dwelling units on
separate lots, which may or may not have a common roof and are separated from each
other by common or shared vertical walls.
Dwelling, triplex, means a single building containing three dwelling units.
Dwelling, zero lot line , means a zero lot line dwelling is a single family detached
unit which instead of being centered on a lot, is placed against at least one of the side lot
lines. The term is synonymous with patio homes.
Easement means a strip of land exte nding along a prop erty line or across a lot, for
which a limited right of use has been granted for a public or quasi-public purpose and
within which the owner of the property shall not erect any trees or permanent structures.
Emergency services means police department, fire department, rescue squad,
emergency medical technicians, ambulatory serv ices, or similar serv ices that respond in
the event of an emergency.
Evergreen tree means a coniferous or other t ype of tree that remains green
throughout the year.
Family means one or more persons rela ted by blood, marriage, adoption, or
guardianship, and not more than four persons not so related, excep t that mentally and
physically handicapped persons for whom care is provided on a 24- hour basis shall be
construed to be a family, in accordance with the provisions of S.C. Code 1976, § 6-7-830.
Family group development means a group of up to six individual detached dwelling
units allowed on a single lot of record o ccupied only by persons related by blood,
marriage, adoption, or guardianship, where all units comply with the density and setback
requirements for the zoning district where the lot is located, except where prohibited in
the RS, CC, VC, LID and ID zoning districts.
Farm Strusture means a structure less than 5,000 sq. ft., located on no less than
five (5) acres in the RC-1, RC-2, RD-1 or RD-2 zoning districts that is being used as a
farm for agricultural production purposes, wh ich is not a public livestock area or a
residential dwelling unit, which does not have cooking or sleeping amenities or facilities,
with or without restroom facilities, a SCDHE C approved septic tank system and electric
service not to exceed 200 Amps, where the use is exclusively associated with the
production, harvesting, storage, drying or raising and growing of agricultural
commodities, including livestock, fowl and bees for honey, or similar commonly known
commodities. Further, the owner agrees to prohibit public access to the structure and sign
the “Farm and Accessory Use Structure Non-Conversion Affidavit ” which certifies that
the structure cannot be converted to a resi dential dwelling unit or a commercial use,
without prior proper zoning and building permit approvals for such conversion, as may be
49
allowed by the zoning and building codes in eff ect at the time of conversion and change
of use request.
Federal manufactured home construction and safety standards means regulations
promulgated by the Department of Housi ng and Urban Development (HUD) governing
the design and construction of manufact ured housing. These standards also set
performance requirements for heating, plumbi ng, air conditions, thermal, and electrical
systems.
Floor means the top surface of an area in a building that is walked on and makes
contact with people’s shoes, from the basement floor to the top floor of a building.
Floor area ratio means an intensity measure of land use derived at by dividing the
total floor area of a building by the total site area.
Fuel supply services means a business that distribut es petroleum, biodiesel, or
similar fuel products for motor vehicles. This does not include gas-selling stations or
convenience stores, which are a type of automotive service. Such businesses may have
above-ground or below-ground tanks.
Garage, private means a structure built to park vehicles inside of it that is for private
use only.
Garage, public means a structure built to park vehicles inside of it that is used by the
general public.
Grandfathered/Legal Nonconformity means and describes the status accorded
certain properties, uses, structur es and activities that legally existed prior to the date of
adoption of the current/active zoning ordina nce which changed its classification from
conforming to nonconforming, where the nonc onformity now exists as a legal
nonconformity, and where the nonconformity may continue without limitation unless
discontinued or abandoned for six (6) months , which then requires the nonconformity to
be brought into compliance with the current c odes in effect at the end of that six (6)
month period of discontinuance and/or abandonment.
Gross floor area (GFA) means the combined sum of the floor area, measured
horizontally, where the floor area for every fl oor or story of a build ing is added to the
sum, including basements and attics, measured fr om the exterior faces of the structure. It
does not include unenclosed porches or detached accessory buildings.
Habitable dwelling means a dwelling meeting the minimum habitability
requirements of this chapter, and other applicable regulations.
Hazard to air navigation means an obstruction determined to have a substantially
adverse effect on the safe and efficient utilization of the navigable airspace of an airport.
50
Heavy construction contractor means a construction contractor that utilizes heavy
equipment including but not limited to earthmoving equipment and/or cranes.
Height means the vertical distance measurem ent from the top of a structure or
vegetation to the ground directly beneath the structure or vegetation.
Home occupation means any occupation within a dw elling, or an accessory building
clearly incidental thereto, carried on by a member or members of the family residing on
the premises, which in no way changes the residential character or nature of the
neighborhood.
Improvement means any man-made immovable item that becomes part of, placed
upon, or affixed to the ground or a structure.
Instrument runway means a runway equipped with a precision electronic navigation
or landing aid suitable to assist the landing of aircraft by an instrument approach under
restricted visibility conditions.
Kennel, outdoor, means any outdoor place or structur e used in whole or in part for
the purpose of keeping, housing, or raising 24 or more animals in any combination,
outside of a fully enclosed structure, whether the animals are boarded, pet animal rescues,
or household pets.
Larger than utility runway means a runway that is c onstructed for and intended to
be used by propeller driven aircraft gr eater than 12,500 pounds maximum gross weight
and jet-propelled aircraft.
Livestock means the keeping or raising of cattle, sheep, goats, swine, horses,
donkeys, mules, burros, buffalo, llamas, or similar animals.
Lot means a parcel of land considered as a un it. The terms "lot," "lot of record,"
"property," or "tract," whenever used in these chapters, are interchangeable.
Lot area means the horizontal area contained within the boundary lines of a lot.
Lot depth means the horizontal distance between the front and rear lot lines.
Lot line means a line bounding a lot which divide s one lot from another or from a
street or any other public or private space.
Lot of record means a lot, the boundaries of which are filed as a legal record.
Lot width means the horizontal distance between th e side lot lines measured at right
angles to its depth along a st raight line parallel to the front lot line at the minimum
required building setback line.
51
Lot, corner, means a lot located at the intersection of two or more streets.
Lot, existing, means a lot that was recorded prior to the adoption of the ordinance
from which this chapter is derived (December 5, 2000) which is the same as when it was
initially recorded.
Lot, interior, means a lot, other than a corner lot, which has frontage on only one
street other than an alley.
Lot, through or double frontage , means a lot which has street frontage on two
opposing ends of the lot.
Lot, flag, means a lot having only its narrow access way to the lot (aka the flag pole)
fronting onto a public or private road or access easement, with the bulk of the lot (aka the
flag) set back from the road. (See lot definition detail above.)
Manufactured home park means a lot with the size and improvements needed to
support the long-term parking of three or mo re manufactured homes, which may include
resident services and facilities.
Manufactured home park space means the individual space within a manufactured
home park designed to accommodate one unit.
Manufacturing, heavy, means the assembly, fabrication, production or processing of
materials that have greater than average impacts on the environment, or that have
52
significant impacts on the use and enjoyment of other properties due to the generation of
noise, smoke, fumes, odors, glare, health or safety hazards, or uses that otherwise do not
constitute "light manufacturing," or any use where the area occupi ed by outdoor storage
of goods and materials used in the asse mbly, fabrication, production or processing
exceeds 25 percent of the floor area of a ll buildings on the lot. The term "heavy
manufacturing" shall include, but not be lim ited to, the following: enameling, lacquering,
plating or galvanizing of metals; foundries or mills producing iron and steel products;
industrial chemical manufacture; meat packi ng plants; mixing plants for concrete or
paving materials and products; oxygen and othe r gaseous manufactur e and/or storage;
pottery, porcelain, and vitreous china manufact ure; wholesale poultry dressing; pressure
treating of wood; stonecutting; tire recapping and retreading; and, tobacco and textile
products manufacturing. (Not including reso urce extraction, mining, or drilling, or
recycling and salvaging operations.)
Manufacturing, light, means the assembly, fabrica tion, production or processing of
materials using processes that ordinarily do not create noise , smoke, fumes, odors, glare,
or health or safety hazards outside of the building or lot where such assembly,
fabrication, production or processing take s place, where such processes are housed
entirely within a building, or where the area occupied by outdoor storage of goods and
materials used in the assembly, fabricati on, production or processing does not exceed 25
percent of the floor area of all buildings on the lot. (Not including heavy manufacturing,
resource extraction, mining, or drilling, or recycling and salvaging operations.)
Marina means a facility located along a shoreline that may have docks, moorings,
supplies and services for watercraft and passengers, to include storage, docking, sales and
repair and construction activities.
Mini-warehouse means a building or buildings in a controlled-access and fenced
compound that contains individual, compartm entalized spaces for th e commercial dead
storage of customer's goods or wares.
Mixed occupancy means any building that is used for two or more occupancies
classified by different occupancy use groups.
Mixed use building means a two-story or taller building in which the ground floor
contains a commercial retail or service bus iness with at least one of the floors above
containing one or more residential dwelling units.
Modular building unit or modular structure means any structure other than a
mobile or manufactured home, constructed off site, and transported to the point of use for
installation. When meeting th e requirements of the Modular Building's Construction Act
(S.C. Code 1976, § 23-43-10), said structure may be located in any zoning district.
Nonconformity, means any lot, use, structure, sign or vegetation which exists that
does not conform to the current requirements of this chapter.
53
Nonconformity, legal means any lot, use, structure, sign or vegeta tion legally in
existence prior to the effective date of the or dinance from which this chapter is derived,
but which fails, by reason of su ch adoption, revision or am endment, to conform to the
present requirements of this chapter.
Nonresidential use means a principal use of land or structure for other than
residential purposes (i.e., commercial, industrial, institutional).
Office, professional, means an office building that houses professional services, such
as accounting, engineering, archit ectural, and legal, which t ypically doesn’t involve the
on-site retail sale of goods.
Outdoor market means a use involving the retail sa le of items outside an enclosed
permanent structure on the same property or by the same or ganizer(s) more than four
days per year, such as, farmers markets and flea markets.
Open space ratio means the intensity of land use as derived by dividing the total
amount of open space area within the site by the total site area.
Parcel – see lot.
Parcel, existing, means a lot that was recorded prio r to the adoption of the ordinance
from which this chapter is derived (December 5, 2000) which is the same as when it was
recorded.
Park, public means a public recreational facility which may include commercial
activities for recreational uses only, open space and public gardens.
Park model/travel trailer means a recreational vehi cle primarily designed and
intended to provide temporary living quarters for recreation, camping, or seasonal use. It
is built on a single chassis, mounted on wheels with a gros
Text truncated. Open the original for the full document.
Source: Colleton County website. First collected Oct 13, 2026.