RecordWell Data

Agenda

Colleton County · Colleton County · meeting of Apr 12, 2022 · Agenda packets

Open the original document More from Colleton County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

AGENDA COLLETON COUNTY COUNCIL REGULAR MEETING TUESDAY, APRIL 12, 2022 6:00 P.M. COUNTY COUNCIL CHAMBERS, OLD JAIL BUILDING 1. Call to Order 2. Roll Call 3. Invocation & Pledge of Allegiance 4. Approval of Minutes a) Regular Meeting March 1, 2022 5. Awards and Recognitions a) Colleton County Fire-Rescue – South Carolina EMS System of the Year Award b) Proclamation – Gregory Kinsey c) Proclamation – Patrick Thomas 6. Appearances & Public Presentations a) Walterboro-Colleton Chamber of Commerce – Mark Wysong, President 7. Administrator’s Briefing 8. Public Hearing 9. Old Business a) 2 nd Reading Ordinance 22- O-03, To Amend Title 9 – Public Peace and Welfare, Chapter 9.02 – Public Nuisance Generally and Chapter 9.04 – Littering, To Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan b) 2nd Reading Ordinance 22-O-04, To Amend Title 13 – Buildings and Construction, Chapter 13.04 – Construction Codes Adopted, Chapter 13.12 – Flood Damage Prevention, Chapter 13.16 – Manufactured Homes and Chapter 13.20 – Uniform Ordinance Su mmons, To Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan c) 2nd Reading Ordinance 2 2-O-05, To Amend Title 14 – Land Management, Chapter 14.04 – Land Development Regulations And Chapter 14.08 – Zoning, To Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan 10. New Business a) 1st Reading Ordinance 22- O-06, By Title Only, To Provide for the Levy of Taxes in Colleton County, South Carolina, for the Fiscal Year July 1, 2022 through June 30, 2023 to Provide for All Other Appropriations Thereof; and to Provide for Other Matters Related Thereto b) 1st Reading Ordinance 22 -O-07, By Title Only, To Authorize the Acquisition of Certain Real Estate and Appurtenant Interests by Colleton County, South Carolina by Mortgage Financing in the Amount of Not Exceeding $750,000; the Execution and Delivery of Certain Instruments, Including a Mortgage Note by Colleton County; and Other Matters Relating Thereto c) Resolution 22-R-13, T o Accept the Grant for the Colleton County Summer Feeding Program for 2022 d) Resolution 22-R-14, To Declare April as Fair Housing Month e) Resolution 22-R- 15, To Approve a Policy of Non- Discrimination on the Basis of Disability Status and to Designate an ADA Coordinator f) Resolution 22-R- 16, To Establish Priorities for the 2022 Annual CDBG County Needs Assessment g) Resolution 22-R-17, To Authorize a Five -Year Sole Source Purchasing Arrangement for Kenworth Trucks h) Resolution 22-R- 18, To Award the Contract for the Resurfacing of South Carolina Department of Transportation Roadways and Colleton County Roadways i) Resolution 22-R- 19, To Authorize the Submittal of a Grant Application for the Bulletproof Vest Partnership (BVP) FY 2021 Award for the Purchase of Bulletproof Vests j) Resolution 22-R-20, To Advertise Board Vacancies k) Resolution 22-R-21, To Appoint Members to Board Vacancies l) Resolution 22-R- 22, To Declare April Child Abuse Prevention and Sexual Assault Awareness Month m) Resolution 22-R-23, To Approve Amendment of t he Agreement for Development of a Joint County Industrial Park, by and b etween Charleston County, South Carolina and Colleton County, South Carolina, Providing for the Development of a Jointly Owned and Operated Industrial/Business Park, so as to Include Additional Property in Charleston County as Part of the Joint County Industrial Park n) Resolution 22-R- 24, To Approve Amendment of t he Agreement for the Establishment of a Multi-County Industrial/Business Park for Properties Located in a Redevelopment Project Area, by and between Charleston County, South Carolina and Colleton County, South Carolina, Providing for the Development of a Multi-County Industrial/Business Park, so as to Include Additional Property in Charleston County as Part of the Multi-County Industrial/Business Park 11. Items for Information and Public Record 12. Public Comments (3 minutes per person/max time 20 min.) 13. Council Time 14. Executive Session a) Real Estate – Easement Green Pond Railway b) Legal – CPST Referendum Procedures c) Personnel – Library d) Personnel – Fire-Rescue e) Economic Development – Project Ruby 15. Adjournment 16. Informal Meeting of the Whole COUNTY COUNCIL MEETING ON April 12, 2022 Colleton County Council will hold a reg ular meeting on Tuesday, April 12, 2022, at 6:00 pm. The public will be able to stream the meeting from a link on the County’s home page or by going to www.colletoncounty.org/live. Individuals who would like to participate in public comment can do so at www.colletoncounty.org/comment. County Council Meeting April 4, 2022 1 MINUTES TUESDAY, MARCH 1, 2022 VIRTUAL REGULAR MEETING 6:00 P.M. Colleton County Council Council Chambers, Old Jail Building 109 Benson Street Walterboro, SC 29488 Present: Chairman Steven Murdaugh called the meeting to order with Council Members Dr. Joseph Flowers, Art Williams, Gene Whetsell and Phillip Taylor in attendance. Others Included: Kevin Griffin, Sean Thornton, Meagan Utsey, Jon Carpenter, Joshua Rowland. Phillip Taylor gave the invocation and led the Pledge of Allegiance. Approval of Minutes A. Capital Projects Sales Tax County Project Ranking January 19, 2022—Dr. Flowers moved to approve the minutes of the Capital Projects Sales Tax County Project Ranking Meeting held on January 19, 2022. The motion was seconded by Councilman Taylor and the motion carried unanimously. B. Special Meeting – Opioid Litigation January 24, 2022—Councilman Whetsell moved to approve the minutes of the Special Meeting – Opioid Litigation Meeting held on January 24, 2022. The motion was seconded by Councilman Williams and the motion carried unanimously. C. Special Meeting – Redistricting Public Hearing January 26, 2022—Councilman Taylor moved to approve the minutes of the Special Meeting – Redistricting Public Hearing Meeting held on January 26, 2022. The motion was seconded by Councilman Whetsell and the motion carried unanimously. D. Regular Meeting February 1, 2022—Dr. Flowers moved to approve the minutes of the Regular Meeting held on February 1, 2022. The motion was seconded by Councilman Taylor and the motion carried unanimously. Awards and Recognitions A. Colleton County Risk Management received the 2021 Outstanding Safety Achievement Award from the South Carolina Counties Workers’ Compensation Trust— Chairman Murdaugh read the award aloud. Mr. Griffin: Stated that Mr. Welch has done a fine job and we do appreciate the work that he is doing with the risk management. ***All Council members congratulated the Risk Management team on a job well done. County Council Meeting April 4, 2022 2 Administrator’s Briefing Mr. Griffin stated that the first three items listed under new business are related to our 10 year update to the Colleton County comprehensive plan. The next step is the update to the Colleton County zoning ordinance. Those three items will pertain to that by title only. We will have a full review of that for you at the next council meeting. Next, we have put out for bid the public defender services. Ashley Hudson has resigned and moved on to do different things. We were able to, with a lot of help from the county attorney, negotiate with the public defender’s office for services. Also, there is a change order for the venture park waste water improvement project. They had a 90 day reservation on pipe and other construction items, with the time that it took to get through both, the state and especially the EDA regulations, we’ve got until about 110-120 days. So, that pricing had to go back out for bid, which calls for a price increase. We did have the funds within the grant project so there would be no impact on the general fund. With all that being said, I would like to introduce our new Planning and Development director, Josh Rowland. He has been hired since Mr. Montgomery moved back to Arizona. Mr. Rowland s tated that he wanted to thank Mr. Griffin, County Council, and staff for this opportunity, it is an honor to serve Colleton County and its residents. In regards to the zoning ordinance, the staff has been working diligently to review these codes and review recent trends happening not only in Colleton County, but within the state to ensure that we are ready to handle certain development trends long term. To my knowledge an update has not happened since a previous ordinance in 2010 other than a few minor updates along the way. The goal of this was to look at the comprehensive plan for future land use to identify those trends of whether it is industrial areas. There has been a few areas of UDI 1 and UDI 2 for urban developments. They really did not address certain types of recreation, from an aspect of commercial recreation. We have looked at a lot of the flood plan items and have coordinated with FEMA and DNR to be sure we have stayed within compliance. They did have a few comments that the planning commission did review three times already, and we will be taking it back this month again to review these final changes that our staff has made. We should have it together and ready for council next month. Mr. Griffin stated that the final item that we did under council time is the county mask requirement. I know there are a number of things both local jurisdiction, state, and federal that are looking at lifting those requirements. We did put that item on the agenda for council discussion. Councilman Williams stated that he appreciates the administrator taking his time a nd explaining to us why the change order took place, because you know I am a stickler for change orders. Dr. Flowers made a motion to move into public hearing. The motion was seconded by Councilman Whetsell. The motion carried unanimously. Public Hearing A. CDBG (Community Development Block Grant) & HOME Public Hearing Concerning Needs Assessment County Council Meeting April 4, 2022 3 Michelle Knight stated that I am here to run through the program, so that hopefully at the next meeting council can rank their priorities. This public hearing is for our 2022 program year. ***Ms. Knight discussed the information provided on the slide show attached. Ms. Knight s tated that is all I have for my formal comments. I will be glad to answer any questions. I did pull the county’s priority list from last year, so if you all are interested in what you all ranked last year. I don’t know if you all typically go back and discuss that as a committee with staff and then rank them at your next meeting. I will be glad to call out what was identified last year if you would like to know. Chairman Murdaugh stated that I would like to get a copy of the presentation and go through that in detail as there is a lot of information there. For me personally I would like to go through the slide before we prioritize them. There seemed to be some new stuff in there that I am not familiar with. Councilman Williams agrees with the Chairman. Ms. Knight s tated that the biggest new thing is they are upping the maximum grant requirements and their neighborhood program, if you are doing water and sewer activity, and then with the streetscape. They’ ve upped their maximum grant amount for special projects, because when we originally started it was $150,000 set aside per project which is really not a lot of money to do anything even back then. So, those were the big things money wise. As far as the actual activities, they haven’t really changed a lot in the last couple of years. If you have any questions after reviewing the hard copy of the slide send me an email or give me a call. Chairman Murdaugh a sked if it would put us at some disadvantage if we do not rank these items tonight. Ms. Knight stated no, and the reason it won’t is because Gadsden Loop will not close before the middle of April. Councilman Williams stated that he would like to take Michelle up on the offer to share with us the ranking of last year’s projects. I would like the community to be able to hear, as well as, myself. Ms. Knight stated that last year’s ranking is as follows, first priority wa s public facilities and infrastructure described as landfill recycling, boat landing upgrades, Walterboro and rural water and sewer implementation, technology research, library technology upgrades, technology center expansion upgrades, and educational classrooms technology upgrades. The second priority was Economic Development which included the development of product, infrastructure, rail access, roads, water, sewer, and airport improvements. The third priority was public safety. This included fire sub sta tions, fire training facilities, Sheriff sub -stations, and corona virus preparedness, response, and recovery. The fourth priority was road, bridges, and drainage which included continued road drainage improvements, dirt road improvements, and culvert repairs. The fifth priority was recreation which included pedestrian bike trails, boat County Council Meeting April 4, 2022 4 ramp improvements and parks. The sixth priority was transportation which is described as the I-95 intersection improvements at exit 62 -mcleod road, street improvements and si dewalks. The seventh priority is for tourism and marketing described as beautification and litter control, billboard and other signage, and video advertisement. The eighth priority was housing and you talked about USC Salk student housing and affordable housing. Now, that was a very long prioritization which is fine as it was general enough that we could make things work. However, typically when you get ready to rank you will be looking at for the coming year with CDBG your top three. That is not to say you shouldn’t list all these because there could be a reason to go to a lower priority and skip to it. Councilman Taylor asked Ms. Knight, “When you talk about the Gadsden loop Project being open, you’re saying that we will not be in the position to make any other applications until that is complete, even though that is neighborhood revitalization?” Ms. Knight stated that is correct, because it is over 30 months old. We are in the last final leg of it. I think the sidewalk is the very last piece that we have there to do. Councilman Taylor stated that I have spoken with the contractor today and he mentioned that there may be something with the park and the driveway, but I am not sure what he was referring to. In relation to that, will we be eligible for a fall round? Ms. Knight replied that you should be able to because I think the schedule is such that everyone is anticipating that we should be eligible no later than fall round, and possibly before which means if the County had some project that was ready to go that they’ve done some initial work on that we might be able to do something on. Dr. Flowers stated that we need to move away from this and do our ranking at the next meeting. Councilman Murdaugh stated that he has not received any public comments. Ms. Utsey stated yes we have one public comment by Stacey See from In His Name Colleton. Public Comment: I am with In His Name Colleton and we want to know more about the affordable housing plan for the homeless and low income. We have clients that we deal with every day that are in need of affordable housing. We have several clients that have been looking for housing for several months and have not been able to find any. Ms. Knight s tated that from our stand point the home ARPA money, the American Rescue Plan Act money, we are receiving through HUD. We’re in the process of trying to get together a substantial amendment to be able to start utilizing those funds. We are getting ready to engage a consultant to help us get through the amendment process. We will be having some meetings on that in the future separate from this. Also, Kimberly and I talked and we are going to try and set up a meeting with In His Name -Colleton just to see what some of their n eeds are and to see if there are some places where we can work together on some things. No further discussion. County Council Meeting April 4, 2022 5 Councilman Taylor made a motion to move out of public hearing. The motion was seconded by Councilman Williams. The motion carried unanimously. Old Business A. 2 nd Reading Ordinance 22-O-01, An Ordinance Authorizing The Execution And Delivery Of A Fee-In-Lieu Of Tax Agreement By And Between Colleton County And An Industry Currently Known To The County As “Project Ruby,” Whereby Colleton County Will Enter Into A Fee -In-Lieu Of Taxes Arrangement With Project Ruby; Providing For Payment By Project Ruby Of Certain Fees In Lieu Of Ad Valorem Taxes; Providing For Assignment Of Certain Existing Economic Developme nt Incentives To Project Ruby; Providing For Certain Special Source Revenue Or Infrastructure Credits; To Further Amend The Multi -County Industrial/Business Park Agreement Between Colleton County, South Carolina And Hampton County, South Carolina, Providing For The Development Of A Jointly Owned And Operated Industrial/Business Park, So As To Include Additional Property In Colleton County As Part Of The Park; Providing For The Allocation Of Fee-In-Lieu Of Taxes Paid By Project Ruby Under The Agreement For E stablishment Of Multi-County Industrial/Business Park; And Other Matters Relating Thereto. Councilman Taylor moved to approve the 2nd Reading Ordinance 22-O-01, An Ordinance Authorizing The Execution And Delivery Of A Fee -In-Lieu Of Tax Agreement By And Between Colleton County And An Industry Currently Known To The County As “Project Ruby,” Whereby Colleton County Will Enter Into A Fee -In-Lieu Of Taxes Arrangement With Project Ruby; Providing For Payment By Project Ruby Of Certain Fees In Lieu Of Ad Valor em Taxes; Providing For Assignment Of Certain Existing Economic Development Incentives To Project Ruby; Providing For Certain Special Source Revenue Or Infrastructure Credits; To Further Amend The Multi -County Industrial/Business Park Agreement Between Col leton County, South Carolina And Hampton County, South Carolina, Providing For The Development Of A Jointly Owned And Operated Industrial/Business Park, So As To Include Additional Property In Colleton County As Part Of The Park; Providing For The Allocation Of Fee-In-Lieu Of Taxes Paid By Project Ruby Under The Agreement For Establishment Of Multi-County Industrial/Business Park; And Other Matters Relating Thereto. The motion was seconded by Councilman Whetsell. The motion was carried unanimously. B. 2nd Reading Ordinance 22 -O-02, Authorizing the Execution of a Temporary Lease Agreement Between Colleton County and Causie Contracting, Inc. for the Staging of Personnel and Equipment related to the I -95 Construction and Repaving from St. George to Point South. Councilman Taylor moved to approve the 2nd Reading Ordinance 22-O- 02, Authorizing the Execution of a Temporary Lease Agreement Between Colleton County and Causie Contracting, Inc. for the Staging of Personnel and Equipment related to the I -95 County Council Meeting April 4, 2022 6 Construction and Repaving from St. George to Point South. The motion was seconded by Councilman Whetsell. The motion was carried unanimously. New Business A. 1st Reading Ordinance 22-O-03, By Title Only, To Amend Title 9 – Public Peace and Welfare, Chapter 9.02 – Public Nuisance Generally and Chapter 9.04 – Littering, To Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan Councilman Whetsell moved to approve the 22-O-03, By Title Only, To Amend Title 9 – Public Peace and Welfare, Chapter 9.02 – Public Nuisance Generally and Chapter 9.04 – Littering, To Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan. This motion was seconded by Councilman Taylor. The motion carried unanimously. B. 1st Reading Ordinance 22 -O-04, By Title Only, To Amend Title 13 – Buildings and Construction, Chapter 13.04 – Construction Codes Adopted, Chapter 13.12 – Flood Damage Prevention, Chapter 13.16 – Manufactured H omes and Chapter 13.20 – Uniform Ordinance Summons, To Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan Dr. Flowers moved to approve the 1st Reading Ordinance 22-O- 04, By Title Only, To Amend Title 13 – Buildings and Construction, Chapter 13.04 – Construction Codes Adopted, Chapter 13.12 – Flood Damage Prevention, Chapter 13.16 – Manufactured Homes and Chapter 13.20 – Uniform Ordinance Summons, To Coincide With The Ten Year Update Of The Colleton County Comprehensive P lan. The motion was seconded by Councilman Whetsell. The motion carried unanimously. C. 1st Reading Ordinance 22-O- 05, By Title Only, To Amend Title 14 – Land Management, Chapter 14.04 – Land Development Regulations And Chapter 14.08 – Zoning, To Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan Councilman Taylor moved to approve 1st Reading Ordinance 22-O-05, By Title Only, To Amend Title 14 – Land Management, Chapter 14.04 – Land Development Regulations And Chapter 14.08 – Zoning, To Coincide With The Ten Year Update Of The Colleton County Comprehensive Plan. The motion was seconded by Councilman W hetsell. The motion carried unanimously. D. Resolution 22-R-09, To Approve a Change Order for the Venture Park Wat er and Wastewater Improvements Project Councilman Whetsell moved to approve Resolution 22-R-09, To Approve a Change Order for the Venture Park Water and Wastewater Improvements Project. The motion was seconded by Dr. Flowers. The motion carried unanimously. County Council Meeting April 4, 2022 7 E. Resolution 22-R-10, To Award the Contract For Magistrates Court Public Defender Services Councilman Whetsell moved to approve Resolution 22-R-10, To Award the Contract For Magistrates Court Public Defender Services . The motion was seconded by Councilman Williams. The motion carried unanimously. F. Resolution 22-R-11 To Advertise Board Vacancies Councilman Williams moved to approve Resolution 22- R-11 To Advertise Board Vacancies. The motion was seconded by Dr. Flowers. The motion carried unanimously. Chairman Murdaugh stated that we have three vacancies on the Colleton County Library Board of Trustees and five vacancies on the Keep Colleton Beautiful Board. Councilman Taylor asked, “Is there any reason that…are there any more members on Keep Colleton Beautiful that we have five vacancies, do we have zero members?” Chairman Murdaugh stated I don’t know if we have any. Ms. Brinson stated that we do have some members. Chairman Murdaugh asked if that is a seven or nine member board? Ms. Brinson stated that it is a nine member board if I am not mistaken. Councilman Williams asked Ms. Brinson, “Are those folks notified when their time limit is up?” Ms. Brinson stated that they have been notified by letter. No further discussion. G. Resolution 22-R-12 To Appoint Members to Board Vacancies Councilman Williams s tated that he recommends taking a look at one of the applicants closely. Dr. Flowers stated that one of them is not a resident of Colleton County. Chairman Murdaugh stated that he did notice that earlier today and I called and spoke with Mr. Griffin. This Accommodations Advisory Board is not created by Resolution of Council or Ordinance of Council. It is a statutory created board and that statute does not require the board members to be residents of the county. That does not mean that we can’t require it, but it does have to be in that specific industry. Mr. Griffin if you can kind of highlight the statute. Mr. Griffin stated that we did have some wrestle with staff when we first looked at this. It is not a board created by Resolution or Ordinance; it is created by state law and is not a board but an advisory committee in regard to the accommodations tax funds. The advisory County Council Meeting April 4, 2022 8 committee consists of seven members with a majority be ing selected from the hospitality industry of the municipality or county receiving the revenue. At least two of the hospitality industry members must be from the lodging industry where applicable. It does not say anything about residency, however that is c ertainly up to council if they would like to require the person reside in the county. My understanding is that this person works for two individuals who own a number of lodging establishments within the county, but those two individuals did not feel like they had the time for the requirements of the board. Therefore, they designated this person to apply to the board and represent them. Certainly that is within council’s purview with which way they want to go with it. Councilman Taylor stated I served on that accommodations tax committee years ago and I do recall working with people who are in hospitality and own hotels in different parts of the state and other communities and they have them here and they’ve been on there. So, I didn’t see the major issue because I realized it was going on before. Mr. Griffin s tated that we are having a really hard time getting applicants to fill those statutory positions as well, and we have some money that we have to appropriate to some projects by July 1 or we are going to lose the funds. Councilman Williams stated my biggest concern is once we….you know we always talk about the state running Colleton County from Columbia…and now is an opportunity where we are to yield to appointing someone that doesn’t live in the county. However, I do realize that it is a unique situation because of where they work but I would hope that there is someone from some form of management from some of the hospitality industries that are applying for this that they could appoint someone that lives in the county to serve. Chairman Murdaugh asked if there were any further comments. Councilman Taylor stated there is not a motion of the floor yet. Appoint the members by acclamation to the Accommodation Tax Advisory Committee, Steven Dorner and Jennie Smith; and the Colleton County Library Board of Trustees, Olivia Padgett. Councilman Williams stated that he preferred this to be separated. Councilman Taylor moved that the Accommodations Advisory Tax Committee vacancies be filled by applicants Steven Dorner and Jennie Smith. Dr. Flowers seconded the motion. Councilman Williams stated that for point of discussion since I requested to separate them. I will be in support of Ms. Jennie Smith but I will not be in support of Steven Dorner that does not live in the county. Chairman Murdaugh stated to clarify the vote everyone except Councilman Williams is in favor of Steven Dorner and there is a unanimous vote for Ms. Jennie Smith All councilmembers are in favor except Councilman Williams of Steven Dorner and there is a unanimous vote on Ms. Jennie Smith. County Council Meeting April 4, 2022 9 Chairman Murdaugh made a motion to appoint Mr. Steven Dorner to the Accommodations Tax Advisory committee. Councilman Taylor seconded that motion. All in favor say “I”, Dr. Flowers and Councilman Whetsell said “I”. All opposed, Councilman Williams stated “Nah”. Chairman Murdaugh made a motion to appoint Ms. Jennie Smith to the Accommodations Tax Advisory Committee. Councilman Williams seconded that motion. The motion carried unanimously. Councilman Taylor made a motion to appoint Ms. Olivia Padgett to the Library Board of Trustees. Councilman Williams seconded that motion. The motion carries unanimously. Mr. Griffin stated that he would like to ask that we add another item to executive session, Real Estate for Voter Registration office. Chairman Murdaugh a sks if anyone would like to make a motion to amend executive session. Councilman Williams made a motion to amend the agenda to add real estate for voter’s registration to executive session. Councilman Taylor seconded the motion. The motion carried unanimously. Chairman Murdaugh stated we will add that as line item “d”. Public Comment Sabrina Johnson: This is a request that the minutes from the Wednesday, January 19, 2022, Special Meeting – Capital Projects Sales Tax, 5:30 PM Meeting be amended to include the Capital Sales Tax Priority List votes from each of the Colleton County Council members. The individual priority lists are important to reflect the Councilmen’s priorities for Colleton County and should be in the public record. Thanks, Sabrina L.W. Johnson Council Time Chairman Murdaugh: We have a couple of items here item “a”, County Mask Requirements and item “b”, CPST Referendum. We have some discussion in executive session so I am going to hold that item until we come out of executive session. However, we do have the county mask requirement. Mr. Griffin would you like to speak to that. It seems like a lot of people are doing away with this mask requirement. Mr. Griffin stated that both the State and Federal requirements have been relaxed within the last week to two weeks. I believe the school board is also considering this at their next school board meeting this week as well. We have had a lot of requests by citizens within the county to remove this requirement within the buildings. Hopefully we are at the point where this pandemic is receding somewhat. I wanted to bring this to council for review. This would also put us back to in person council meetings. County Council Meeting April 4, 2022 10 Dr. Flowers stated that he tinks it is time to relax it. I have seen so much covid now and I think it’s time to understand we will not get rid of it, we are going to have to live with it. We are go ing to have to let people individually take care of their own health and not require it. Councilman Taylor and Councilman Whetsell concur. Councilman Williams stated that if we are going to do that I recommend that we start back having public meetings…open meetings in a public setting. Councilman Taylor stated that he concurs. Chairman Murdaugh asks Mr. Griffin if the last Ordinance that was adopted had a sunset. Mr. Griffin stated that he does not believe so. Chairman Murdaugh asks if this was done by resolution or ordinance. Ms. Utsey: Neither. Chairman Murdaugh asks if council would like to make a motion to rescind the mask requirement. Dr. Flowers made a motion to rescind the mask requirement within county buildings. Councilman Whetsell seconded the motion. The motion carried unanimously. Chairman Murdaugh stated that before we go into executive session I want to read into the record an email sent to me by Councilman Phillip Taylor. “Dear Honorable Chairman Steve Murdaugh, Please accept notice that I must recuse myself from the matter on the agenda for executive session with the Colleton Sheriff's Office. Please ensure that this notice is read for the minutes. Thank you, Phillip M Taylor, Sr. Vice Chairman Colleton County Council” Councilman Williams stated that before we go into executive session , since it is council time , I have two requests that I would like for consideration. First, I would like for us to set up a meeting for all municipalities within C olleton County and maybe even including the school district. Secondly, I would like for us to reconsider reentering the Lake Marion water project process along the I-95 corridor. County Council Meeting April 4, 2022 11 Chairman Murdaugh asked, “Are you wanting to have an informal meeting?” Councilman Williams stated, “Yes, an informal meeting.” Chairman Murdaugh asked, “Are you wanting to do this as part of our regular council meeting?” Councilman Williams replied, “No, I think we should schedule something separate. I just think we are all in the same county and we very rarely have us and the municipalities discussing anything. We should have the same common goals, but then sometimes I question that. Not council, just speaking of all the municipalities and the school district. I don’t see us growing until we get on the same page. Chairman Murdaugh stated I do not have a problem with meeting. I believe we have more involvement with the City of Walterboro because they are right here and we have members that serve on boards. Definitely the small er municipalities we don’t have any communication with them. I do not have any opposition to meeting. I am just trying to think of what is the most convenient. Councilman Williams stated I was thinking we all sit around the table and have a conversation that is if they are willing. If we extend the offer and they don’t take the offer, then silence gives consent and we will move on and do our thing and they do their thing. I think at some point we need to start a conversation and work together if we are hoping to develop Colleton County. I believe that since we are County Council that maybe we need to be the ones to extend the olive branch. Chairman Murdaugh stated that what you’re envisioning is if we can get everyone together. Councilman Williams replied yes, if we can find a 5 th Monday any time coming up or one of those unusual dates that no one would normally have plans for. Chairman Murdaugh stated that maybe we can set a date and ask all the municipalities. We will have to do this somewhere like the farmer’s market in order to accommodate all those individuals. Mr. Griffin stated I met with Iris from the Town of Edisto last week. I have been working b ack and forth with her as they would like to have a joint council meeting as well to discuss some issues. Are we discussing each individual municipality or all of them in one meeting? Chairman Murdaugh stated that I think Councilman Williams suggested we get them all together at one time. It might benefit them to hear each other’s problems and solutions. Dr. Flowers stated if we are going to have a meeting I think we need to have some outline of what we are going to discuss. We need to look at what we ar e trying to accomplish rather than just having a meeting. Councilman Williams stated I agree and if I need to be the one who gets with the county administrator to work on points of emphasis that is fine with me. County Council Meeting April 4, 2022 12 Chairman Murdaugh stated that I think we should extend the invitation to the municipalities and ask them to send us a list of topics they would like to discuss, and then from that list we can form an agenda. If Kaela can contact all the municipalities…do we want to pick a date with all of us here? Mr. Griffin stated let us work the Calendar and we’ll coordinate back with council on a date in late March early April. Chairman Murdaugh stated as far as the second item, Lake Marion Water process. We looked at this once before and I don’t mind us discussing it again if we have some legitimate area or need for it. The cost of that thing just escalated to the point it was almost cost prohibited. Particularly now that we actually have water and sewer quality and it seems the infrastructure for sewer is more difficult than the water. I am certainly open to us discussing it if they want to have a representative come meet with us. We need to assess what need we would have to get back into that arrangement. Councilman Williams stated one of the main needs that I see is, where does the City of Walterboro provide services beyond the city limits? You’ve got some a little bit outside of the city, but there are other areas up and down the I -95 from Dorchester County to Hampton County that we don’t address. I think at some point in order for us to be in a position to develop and grow economically we are going to have to plan beyond what limitations that the city provides for us. Chairman Murdaugh stated I certainly understand that, but I think back when we firs t actually talked with them we didn’t have our own water and sewer authority, which we do now. However, I am open to the discussion if they want to tell us how they can benefit the county and make it cost effective. I do have some concerns, because the las t time we had this discussion it got so cost prohibited. Councilman Taylor stated one thing I will mention is I have spent a great deal of time talking with the rural infrastructure authority, Ms. Bonnie and several others. Dorchester County has done some very innovative things working with the project of late. They’re encouraging regional development, and multiple counties to work on projects together. So, there has been some conversations and Mr. Griffin has received some information. In fact we talked a little earlier this morning. I was waiting to bring it out until I read through it, but I am glad Councilman Williams brought it out. I was not here when the county initially looked at the Lake Marion project. There is what they call tranches of funds coming down from the feds to do infrastructure projects. We would be remiss if we don’t take the time to look at the opportunities that may exist and to work together regionally. We have some real critical issues, housing is deplorable and peoples water quality, tap and feeds, and to get water across the street is almost $6000. How does a family of low to moderate income get $6000 to get a water tap? So, we need to look at a solution and maybe this will be a way for us to do it. Chairman Murdaugh stated I hear what you all are saying and I have no problem with us looking into it again to see. When they developed it before they had different phases of development and you had to buy in each phase. So then the next phase would come along and people w ho were buying in, the people of the first phase would say we paid all this cost upfront so you have to pay County Council Meeting April 4, 2022 13 all this to get in. So by the time it was all done…what we would have to evaluate is what can they provide us, water cost per unit, to what we can do ourselves. Dr. Flowers stated Mr. Chairman we can’t solve all this tonight. I think we need to have them send us a representative and listen to what they have to say and that’s fine, but before we thought it was cost prohibitive. Chairman Murdaugh stated I think we can certainly can reach out to them. Mr. Griffin if you want to reach out to them. Councilman Whetsell stated that the last time we discussed this there was a lot of development going on around Cottageville and this pipeline coming down, the water is not going to help Cottageville at all. I mean you’re going to have to run a long way through the power lines that go through the western section of the county to get down to Cottageville, that is a pretty long pull. They decided they could put a well at Cottageville that would serve that area down there a lot cheaper than bringing water from anywhere else if they had to have it down there. Chairman Murdaugh stated we could still see what they have to say. Also, since we are in council time, the request that was made by Ms. Johnson about the individual council members and how they ranked the projects, does anyone have a problem with it being released? Councilman Taylor stated I just asked the chairman this week for us to reconsider re -ranking the projects. I had some consolation after leaving the meeting, I don’t mind if they are shared, but I felt kind of hurried and on the spot with it. I felt like we could look at it in a greater way. If we could have a chance to go through and have a walkthrough of the detention center. The request came through and we talked about doing it. We can have a greater look…eyes on project so we can see how we can work with these projects. Maybe the Council can reconsider and really look at some of the things the community wants. No further discussion. Executive Session Councilman Williams moved to go into executive session. Councilman Whetsell seconded the motion. The motion carried unanimously. Councilman Williams moved to exit executive session. Councilm an W hetsell seconded the motion, which carried unanimously. Chairman Murdaugh stated that we were back in open session, during Ex ecutive Session we discussed a real estate matter involving an easement of the Green Pond Railway, Legal matter involving the Lowcountry Community Action Agency, opioid litigation settlement, Capital Project sales tax referendum, a personnel matter involving the Sheriff’s Office, and a real estate matter involving the voter’s registration. Are there any legal actions to take at this time? County Council Meeting April 4, 2022 14 Dr. Flowers moves to move the Capital Project Sales Tax Referendum to the next election cycle. Councilman Williams seconded the motion. The motion carried unanimously. Chairman Mu rdaugh made a motion that we transfer from the general funds to the Sheriff Department’s budget, $200,588.00 to allow for personnel adjustments to the Sheriff’s Department. Councilman Williams seconded the motion. I would like to note for the record that Councilman Taylor recused himself from this. Councilman Whetsell stated that he is also recusing himself. The motion carried 3 votes and 2 that recused themselves, zero opposed. Adjournment Dr. Flowers moved to adjourn the meeting, Councilman Williams seconded the motion, which carried unanimously. This ___ day of April, 2022. ______________________________ Steven D. Murdaugh, Chairman ATTEST: ______________________________ Kaela Brinson, Clerk to Council **The remainder of this page intentionally left blank. Proclamation for Colleton County Council’s Recognition and Appreciation of Mr. Gregory Kinsey and his Service to Colleton County WHEREAS, Mr. Gregory Kinsey, affectionately known as “Coach Kinsey” was one of the most well - loved administrators of the Colleton County School District; and WHEREAS, Mr. Kinsey worked as a coach, teacher, and administrator. His life left an unforgettable impact for many students who grew to respect him and his values; and WHEREAS, Mr. Kinsey was a Walterboro High School Var sity letterman during 1982 -1983. After college, he returned and served as the head coach at Ruffin High School (1996- 2001) and was named Region VIII-A Coach of the Year during that time period. Kinsey served as an assistant head coach and assistant athletic director at Colleton County High School (2002-06); and WHEREAS, Coach Kinsey was a pillar of the academic and athletic community, serving to greatly impact and influence the youth of Colleton County; and WHEREAS, Colleton County High School Class of 2007 honored his legacy by creating a scholarship to provide annual tuition assistance for high school students in the community; and NOW, THEREFORE, BE IT RESOLVED , in grateful recognition for a distinguished record of outstanding leadership in Colleton County, Colleton County Council does hereby proclaim September 22, 2022, as “Gregory Kinsey Day” in Colleton County. NOW, THEREFORE, Colleton County Council does hereby proclaim its appreciation for Gregory Kinsey and his service to the many adolescents of Colleton County. Adopted this ____ day of April, 2022. ATTEST: ________________________ BY: ___________________________ Kaela Brinson, Council Clerk Steven D. Murdaugh, Chairman Proclamation for Colleton County Council’s Recognition and Appreciation of Mr. Patrick Thomas and his Service to Colleton County WHEREAS, Mr. Patrick Thomas, affectionately known to many as “Mr. T” graduated from Walterboro High School, Class of 1991; and WHEREAS, Mr. Thomas attended South Carolina State University where he graduated with a Bachelor’s in English Education, and was continuing his education at the University of South Carolina Columbia in Educational Leadership; and WHEREAS, Mr. Thomas began his twenty-five year teaching career with the the Colleton County School District at Ruffin High School in 1996. He then continued on to become a member of the faculty at Colleton County High School where he had been since Walterboro High and Ruffin High Schools merged in 2002; and WHEREAS, Mr. Thomas was the a dvisor to the Walterboro Kappa League, the Men of Distinction, Junior and Senior Classes, the Prom Committee, and a coach. Most of all, he served as a mentor, even a father figure, to so many young people, from athletes to the top scholars; and WHEREAS, Mr. Thomas received one of the most-deserving highlights of his career when he was named the 2013-2014 Teacher of the Year for the Colleton County School District; and WHEREAS, Mr. Thomas was actively involved in community service through his fraternity. He maintained that involvement as a member of the Walterboro Alumni Chapter of Kappa Alpha Psi Fraternity, Inc., Sunlight Lodge #221, among other community organizations and events. NOW, THEREFORE, in grateful recognition for a distinguished record of outstanding leadership in Colleton County, Colleton County Council does hereby proclaim its appreciation for Mr. Patrick Thomas, and his service to Colleton County residents. Adopted this ____ day of April, 2022. ATTEST: ________________________ BY: ___________________________ Kaela Brinson, Council Clerk Steven M. Murdaugh, Chairman Sponsor(s) : County Council First Reading : March 1, 2022 I, ____________________, Committee Referral : N/A Council Clerk, certify that this Committee Consideration Date : N/A Ordinance was advertised for Committee Recommendation : N/A Public Hearing on _______. Second Reading : April 5, 2022 Public Hearing : May 3, 2022 Third Reading : May 3, 2022 Effective Date : Immediately ORDINANCE NO. 22-O-03 COUNCIL-ADMINISTRATOR FORM OF GOVERNMENT FOR COLLETON COUNTY [TO AMEND TITLE 9 – PUBLIC PEACE AND WELFARE, CHAPTER 9. 02 – PUBLIC NUISANCE GENERALLY AND CHAPTER 9.04 – LITTERING, TO COINCIDE WITH THE TEN YEAR UPDATE OF THE COLLETON COUNTY COMPREHENSIVE PLAN.] WHEREAS: 1. Title 9 – Public Peace and Welfare, Chapter 9.02 – Public Nuisance Generally and Chapter 9.04 – Littering, of the Colleton County Code of Ordinances were reviewed by the Planning Commission on August 24, 2020 and October 26, 2020; and 2. Chapters 9.02 and 9.04 were edited for legal sufficiency, redundancy and/or unnecessary words and phrases, and updated and clarified simplified phrases in order to be current with the accepted American Planning Association (APA) principles and practices; and 3. County Council believes it is in the best interest of the citizens of Colleton County to approve the changes set forth herein. NOW, THEREFORE, BE IT ORDAINED BY COLLETON COUNTY COUNCIL, DULY ASSEMBLED, THAT: 1. Title 9 – Public Peace and Welfare, Chapter 9.02 – Public Nuisances Generally, of the Colleton County Code of Laws (the same being inclusive of and one with the Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality to read as follows: CHAPTER 9.02. - PUBLIC NUISANCES GENERALLY Sections: 9.02.010. - Public nuisances—General. 9.02.020. - Definitions. 9.02.030. - Unlawful property nuisance. 9.02.040. - Public nuisance declared. 9.02.050. - Responsibility for property maintenance. 9.02.060. - Right to enter property to inspect or abate. 9.02.070. - Abatement procedure/compliance order. 9.02.080. - Voluntary correction. 9.02.090. - Demolition permit fee waiver. 9.02.100. - Mobile home moving permit—Fee waived for salvage. 9.02.110. - Abatement by county. 9.02.120. - Penalties. 9.02.130. - Exemptions. 9.02.140. - Means of appeal. 9.02.010. - Public nuisances—General. Public nuisances can substanti ally degrade residential and business areas, decrease property values, and promote rural blight and deterioration and often violate health and sanitation requirements. This law has been adopted for Colleton County residents to provide for steady and consis tent improvement of the general health, safety, and welfare, in the unincorporated areas of Colleton County. 9.02.020. - Definitions. The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Abatement means action to terminate, stop, cease, repair, rehabilitate, replace, demolish, remove, correct or otherwise remedy or cure nuisance activity, conditions, premises or conduct by such means as to bring the nuisance into compliance with the codes of Colleton County and/or the State in such a manner as is necessary to promote the general health, safety and welfare of the public. Compliance officer means the county planning and development director (hereinafter director), zoning administrator, code enforcement officer, litter control officer, floodplain administrator, sheriff’s deputies, and fire marshal, or anyone qualified that the director designates to act in such capaci ty on his behalf, or anyone designated as such by the county administrator. County means Colleton County, South Carolina. Minor means any person under 18 years of age, and who is not emancipated. Motor vehicle means every vehicle that is self -propelled, to include automobiles, airplanes, motorcycles, watercraft, tractor trailer rigs, heavy equipment, farm tractors and equipment, and/or other such mechanized devices. Owner means the owner or owners of any premises or real or personal property. Premises means any location, building or structure, lot, parcel, property, land or portion thereof. Public nuisance means any condition, activity or device located on premises, which constitutes a health or safety hazard and/or which is or may be unsafe or dang erous or which may reasonably be expected to attract children to the premises and risk injury by their playing with, in, or on it. Responsible party or person means any individual, business or entity responsible for creating, causing, maintaining or perm itting the nuisance activity, premises, condition or conduct; and includes, but is not limited to, the property owner, tenant, lessee, possessor, or occupant, the president or officers of a corporation or business. 9.02.030. - Unlawful property nuisance. It is unlawful for any person owning, renting, leasing, occupying, managing or having charge of, or possessing any real property in the county to maintain such premises in such a manner that any of the following conditions exist thereon: A. An abandoned house or manufactured home such as: 1. An unoccupied and unsecured house or manufactured home that allows access into the dwelling; 2. A partially set up, reconstructed, or demolished house or manufactured home where work is abandoned for 120 consecutive days; 3. A damaged or partially destroyed house or manufactured home not removed or repaired within 120 days after the damage or destruction; 4. A house or manufactured home that is extensively deteriorated, does not have approved and/or operable utilities, such as water, and/or septic service. B. Property maintained in a condition so defective, unsightly, or in a state of such deterioration, disrepair or neglect that it causes a health, safety or fire hazard or a public nuisance to children or others such as: 1. The accumulation of dirt, litter, refuse, trash or debris in carports, parking areas, driveways, front, side, or rear yards, vestibules, doorways, roofs, or on an adjoining sidewalk, easement, access-way, or alley; 2. Storage of personal property (other than items designed for outdoor use) in the front, side, or rear yards visible from public roads or neighboring properties, including, but not limited to, abandoned, unregistered, inoperative, broken, dismantled, or discarded motor vehicles or parts, building materials not currently being used for the construction of improvements on the site, appliances, household furniture or furnishings, equipment, tools, machinery, garbage bags or cans, boxes, trash, debris, or rubbish. C. Any type of vegetation which is rotted, dead, decayed, diseased, overgrown, or likely to fuel a fire, harbor rats, snakes, insect infestations, or other vermin, or which is detrimental to neighboring properties and property values. This subsection shall be applicable to every property wh ere any type of building, facility or other structure is located, regardless of the condition of the structure. This subsection shall not apply to: 1. Property in its natural, undisturbed and unimproved state, or property devoid of any structures that hasn’t been improved or occupied for at least 15 years; 2. Property used primarily for agricultural purposes; 3. Natural wildlife areas, open fields, swamps, marshes, glades, or other similar types of natural settings. D. The discharge of sewage or untreated waste water into any body of water, yard, open ditch, storm sewer or onto any abutting property. E. A motor vehicle that is unlicensed, unregistered, inoperable, abandoned, and/or derelict upon any street, road, thoroughfare, or property. F. Any clothing, linen, t owels, laundry, rugs, mattresses, and other similar material hung, placed, or attached to power lines, trees, bushes, fences, buildings, railings, or walls and visible from public roads or neighboring properties. G. Any violation of the zoning codes, such a s using property in violation of the provisions of any zoning district, conditional use, special exception, planned development, variance or any other land use entitlement or permit. H. Any house, manufactured home, property, condition or activity which is deemed a "public nuisance" as defined by the State of South Carolina. 9.02.040. - Public nuisance declared. Any property found to be in violation of any of the provisions of section 9.02.030 is declared a public nuisance and shall be abated pursuant to the procedures set forth herein which shall not be exclusive nor limit or restrict the county from enforcing other county ordinances or abating public nuisances in any manner provided by law. 9.02.050. - Responsibility for property maintenance. Every responsible party who owns or occupies property within the county is required to maintain such property in a manner that does not violate the provisions of this chapter. 9.02.060. - Right to enter property to inspect or abate. Any compliance officer of the county must secure permission from the property owner to inspect or abate any premises whenever necessary to secure compliance with, or prevent violation of, any provision of this chapter. Where a violation is in clear view from a public road or any surrounding property, on which permission has been granted to enter, the compliance officer may issue a summons for the violation. 9.02.070. - Abatement procedure/compliance order. A. Whenever the compliance officer determines that any property is main tained in violation of any of the provisions of this chapter, they shall serve upon one or more of the responsible parties a written compliance order citing: 1. The date and location of the violation(s); 2. The section(s) of the code(s) violated and a brief description of the violation(s); 3. The actions required to correct the violation(s) or abate the condition(s); 4. The time period after which the county will enter the property to abate the condition(s). B. The time period for abatement shall be at least 30 days, unless determined by the compliance officer that the conditions constitute an imminent threat to the public health, safety or welfare. The compliance officer may grant an extension of up to 180 days upon good cause, provided the responsible party sig ns a written agreement to voluntarily abate the nuisance by a date certain. The zoning board of appeals may grant a one- time extension of up to 180 additional days to the time provided by the compliance officer, where the board deems such extension is warranted. C. Service under this section may be accomplished by direct personal delivery to such persons, but if the whereabouts of the responsible persons cannot be ascertained through reasonable diligence, the serving of the compliance order may also be made by publishing it once each week for two consecutive weeks in a newspaper of general circulation in the county and notice shall be posted on the property and allowed to remain for up to 30 days and shall indicate the nature of the violation, identification of the property affected, with date of posting, and contact information. 9.02.080. - Voluntary correction. A. Applicability. This section applies when the county compliance officer determines that a violation of county codes or regulations has or is occurring. 1. General. The compliance officer shall pursue a reasonable attempt to secure voluntary correction by causing written notice to be given to the violator where possible, or to the owner of record at the assigned E -911 address, explaining the violation(s), the abatement required with deadline, and the appeals process. 2. Issuance of voluntary correction agreement. A voluntary correction agreement may be entered into between the violator and the county, acting through the director. B. Content of voluntary correction agreement. The voluntary correction agreement is a contract, between the county, represented by the director, and the violator, under which the violator agrees to abate the violation within a specified time and according to specified conditions. The timeframe shall be as short as possible, not to exceed 180 days, and may have measurable milestones at a maximum of 45- day intervals. The voluntary correction agreement shall include the following: 1. The name and address of the violator; 2. The E-911 street address, property/parcel TMS number, or a description sufficient for identification of the premises, house, manufactured home, property, or land upon or within which the violation(s) has or is occurring; 3. A description of the violation(s) and a ref erence to the provision of the county Code section(s) or regulation(s) which have been violated; 4. The necessary corrective action(s) to be taken, and a date certain by which correction(s) must be completed, phased if necessary, with defined requirements for task completion at specific intervals; 5. An agreement by the violator that the county may abate the violation(s) and recover its costs and expenses and a monetary penalty pursuant to this chapter from the violator, if the terms of the voluntary correcti on agreement are not met; and 6. An agreement that by entering into the voluntary corrective agreement, the violator waives the right to an administrative appeal of the violation(s) and/or the required corrective action. C. Right to a hearing waived. The violator waives the right to an administrative appeal of the violation(s) and the required corrective action upon entering into a voluntary corrective agreement. D. Abatement by the county. The county may abate the violation(s) if the terms of the voluntary corrective agreement are not met, in accordance with section 9.02.110. 9.02.090. - Demolition permit fee waiver. The demolition permit fee charged by Colleton County is waived for any responsible party who is correcting a condition citable under this chapter. A. Any county resident who loses a house or mobile home in a fire may dispose of the fire debris at the Colleton County Landfill at no charge. This fee waiver does not apply to any commercial building or structure. B. Any metal from the burned house or mobile home must be separated from the debris, and if brought to the landfill, be deposited in the metal recycling area. C. No hazardous materials or regular household waste/garbage may be included with the fire debris. 9.02.100. - Mobile home moving permit—Fee waived for salvage. The delinquent tax office is authorized to waive the permit fee for moving a mobile home for the purpose of salvage. Such permits shall be issued only when the mobile home is being dismantled in a salvage operation, and the permit shall include the name, address, and telephone number of the salvage company; the address where the mobile home is being moved from; the name, address, and telephone number of the current owner of the mobile home; and any other information required by the delinquent tax office. 9.02.110. - Abatement by county. A. Should any property owner, agent or occupant fail to comply with an order to abate violations of such property, the county reserves the right, in addition to other penalties, to cause by proper means such property to be abated of violations. The cost of such abatement shall be billed to the owner, agent, or occupant to be paid in full within 30 days. In addition, an administrative fee of $50.00 or 15 percent of the actual cost of abatement , whichever is greater, shall be applied to the cost. Whenever said bill has not been paid within the prescribed time period, the county shall apply all costs as a lien on the property; and/or such costs shall be applied to the annual tax levied and shall be collected by the county in addition to annual property tax; or collection shall be achieved by other means, as may be available, and provided by law. B. Payment of such liens placed by the county against abated property may be negotiated by the director when such negotiation is deemed to be in the best interest of the county. The director shall be authorized to waive up to 50 percent of the lien within the first five years after the recording of the lien, and up to 25 percent within five to seven years af ter recording. No negotiation shall occur for any lien waivers beyond seven years from recording. Such negotiated liens must be paid in full. 9.02.120. - Penalties. A. Any person who violates any provision of this chapter is guilty of a misdemeanor and, upon conviction, must be fined not more than $500.00 per violation and/or be imprisoned for not less than two days nor more than 30 days. No fine imposed pursuant to this chapter may be suspended to less than $250.00. No sentence of imprisonment imposed p ursuant to this chapter may be suspended. Any punishment including fines imposed pursuant to a criminal conviction for a violation of this chapter shall be separate and apart from any inspection costs and cleanup or abatement costs incurred by the county i n abating said nuisances; and shall be in addition to all other remedies available to the county under state law and local ordinances. B. Each day that the nuisance continues to exist shall constitute a new and separate violation. 9.02.130. - Exemptions. A. The motor vehicle provisions of this chapter shall not apply to the following: 1. Authorized salvage yards and other related businesses duly operated, regulated, and in compliance with all other county ordinances. 2. Vehicles which bear current "antique " license plates as issued by the state department of motor vehicles. 3. Any motor vehicle which is in relatively good condition, can be moved under its own power, and can pass a vehicle safety inspection, yet does not have current license plates due to own er's illness or other reasonable and verifiable causes as determined by the director or his designated compliance officer. 4. Motor vehicles properly stored within an enclosed building or an opaque fence or enclosure, so as not to be visible, as determined by the director or his designated compliance officer. 5. Where a permit has been attained from the planning and development department for vehicles for sale, when such vehicles are operable but don’t bear current license plates (such permit should not exceed 120 days). 6. Authentic/verifiable stock, dirt track, or drag race cars or other relevant race cars or motor vehicles which are being used on a regular basis, are able to move under their own power, and have been determined by the director or his designat ed compliance officer to be true race cars or motor vehicles. B. This chapter shall not be applicable to farm storage vessels, such as school buses or storage containers, when such containers are screened from public view, used primarily for agricultural purposes, and are clearly used regularly. 9.02.140. - Means of appeal. A. The zoning board of appeals, established in section 14.08-7.010, shall hear all appeals originating from actions taken pursuant to this chapter. B. Application for appeal. Any person directly affected by a decision of the compliance officer or a notice or order issued under this chapter shall have the right to appeal to the board of appeals, provided that a written application for appeal is filed within 30 days after the day the decision, notice, or order was served at the property, to the person responsible, or to the owner. An application for appeal shall be based on a claim that the true intent of this Code or the rules legally adopted hereunder have been incorrectly interpret ed, the provision(s) of this Code do not fully apply, or the requirements of this Code are adequately satisfied by other means, or that the strict application of any requirement of this Code would cause undue hardship. C. Notice of meeting. The board shall hear the appeal at their next regularly scheduled monthly meeting, where enough time exists to publish the required public notice in advance of the meeting. D. Open hearing. All hearings before the board shall be open to the public and be published in a new spaper of general circulation 15 days prior to the hearing. The appellant, the appellant's representative, the compliance officer, and any person whose interests are affected shall be given an opportunity to be heard. A quorum shall consist of a majority of the five member board. E. Procedure. The board shall adopt and make available to the public, through the secretary, procedures under which a hearing shall be conducted. The procedures shall not require compliance with strict rules of evidence, but shall m andate that only relevant information be received, as determined by the director. F. Board decision. The board may uphold, modify, or reverse the decision of the compliance officer or grant a one-time extension of no more than 180 days additional to the day s already granted by the compliance officer for abatement. Such decisions shall only be made by a concurring vote of a majority of the board members present. G. Records and copies. The decision of the board shall be recorded. Copies shall be furnished to the appellant and to the director. H. Administration. The director shall cause the compliance officer to take immediate action in accordance with the decision of the board. I. Court review. Any person, whether or not a previous party of the appeal, shall have the right to appeal to the circuit court. J. Stays of enforcement. Appeals of notice and orders (other than imminent danger notices) shall stay the enforcement of the notice and order until the appeal is heard by the appeals board. 2. Title 9 – Public Peace and Welfare, Chapter 9.04 – Littering, of the Colleton County Code of Laws (the same being inclusive of and one with the Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality to read as follows: CHAPTER 9.04. - LITTERING Sections: 9.04.010. – Definitions. 9.04.020. – Control of litter. 9.04.030. - Enforcement. 9.02.040. - Penalities. 9.04.010. - Definitions. For the purposes of this chapter, the following terms, phrases, or words shall have the meanings stated herein unless their use in the text of this chapter clearly demonstrates a different meaning. Compostable trash means every waste accumulation of biological vegetation that is free of dirt, rocks, non-compostable trash and bulky items. Construction site means any property upon which a new building is being constructed, or repairs, additions or the demolition of an existing structure is taking place. Cover means any device, equipment, container, tarp, chain, rope, wire, or line used to prevent any part of a vehicle’s load from shifting or escaping in any manner from the vehicle. Derelict property means any property which has been left abandoned or unprotected from the elements, including but not limited to, wrecked or partially dismantled motor vehicles and parts, trailers, machinery, appliances, building materials, and other articles. Elements means the natural elements which are a reasonably foreseeable means of carrying litter from one place to another. Elements shall include, but not be limited to, wind, fire, rain, water current and animals. Garbage, litter and/or refuse means garbage, litter, rubbish, refuse, and trash collectively which includes any man -made, nature-made, animal or vegetable waste byproducts of any kind or nature whatsoever that can decompose, rot and/or decay, that attracts vermin and/or insects and creates a public health, safety, or fire hazard, or any other kind of a public nuisance. Handbill means any paper, poster, circular, coupon, advertisement, or pamphl et to be circulated for the purpose of making some announcement, except newspapers. Loading or unloading dock means any dock or area used in the process of receiving, shipping, and/or transporting goods, wares, commodities, and persons. Newspaper means any newspaper of general circulation, as defined by general law, and in addition thereto, any periodical or current magazine regularly published with not less than four issues per year and sold or distributed to the public. Person means any individual, owner or lessee, firm, business, partnership, sole proprietorship, association, corporation, company, not -for-profit organization, or any governmental entity. Private property means any land, dwelling, building or other structure belonging to, or restricted for the use or enjoyment of particular persons. Public property means any land, property, street, road, highway, alley, public right -of-way or easement, median, sidewalk, path, bridge or other way, building, or structure in which the public has a right to use, whether publicly or privately owned. 9.04.020. - Control of litter. A. Littering prohibited. It is unlawful for any person to throw, discard, or deposit garbage, compostable trash, or derelict property in any manner or amount in or upon any pr operty, highway, street, body of water, ditch, creek, park, etc., within the county except in receptacles authorized and provided for that purpose. B. Loads on vehicles. No person shall drive, move, park, or in any other way operate any vehicle within the c ounty unless said vehicle is loaded so as to prevent any of its load from shifting or escaping therefrom. 1. Any vehicle transporting or hauling material such as garbage, compostable trash, or derelict property or any other material that could escape the vehicle, must be covered and/or secured with a tarp or other appropriate cover or tie-down, as defined herein. 2. Any driver or other person in direct control of any vehicle from which any materials or objects have escaped shall immediately cause said material to be cleaned up at his/her own expense. 3. When any litter is thrown or discarded from any type of motor vehicle the operator or owner, or both, shall be deemed in violation of this section. C. Handbills. No person shall cause any handbill to be thrown, sca ttered, deposited or distributed upon any public or private motor vehicle, sidewalk, street, lane, alley, ground, pole, tree, fence, structure or building within the county., It shall not be unlawful to distribute handbills to private residences, offices, or mercantile establishments if they are handed in at the door or securely fastened to reasonably prevent them from being scattered about by the elements or as otherwise specifically allowed by other ordinance(s). D. Maintenance of property and receptacles. 1. All persons shall store their garbage in leak -free, covered containers to eliminate the elements from spreading the debris and unsightly garbage about the property owned, managed, or controlled by them. Spillage and overflow around containers shall be cleaned up as quickly as possible after it occurs. 2. No person shall sweep or deposit any accumulation of garbage or derelict property into any gutter, street, parking lot, water body or waterway, or other property within the county. 3. All construction and demolition sites shall maintain on-site receptacles throughout the duration of the work being performed as a means to secure any loose debris, building material wastes, and other garbage and derelict property from being scattered about the site, if the materials are not otherwise properly disposed of on a regular basis. 4. It shall be the responsibility of every owner, manager, or occupant of any public or private property or place to provide, and maintain adequate and suitable receptacles and/or containers capable of containing any garbage or derelict property until proper final disposal is accomplished. 5. Any unauthorized accumulation of uncontained garbage, compostable trash, and/or derelict property on any public or private property is a violation of this chapter. 6. The owner, operator, or manager of a loading or unloading dock shall constantly maintain the dock area in such a manner that litter will be prevented from being carried by the elements to adjoining premises, streets, etc. 7. The owner, manager, o r operator of any commercial -residential, commercial, or industrial public place, shall constantly maintain the premises clean of all litter and take measures to contain said litter on the property. It is unlawful to permit the uncontained accumulation of litter thereon or the dispersion of litter therefrom. E. Convenience sites and dumpsters. 1. Except where specifically authorized by formal council agreement, Colleton County convenience sites are restricted for use by Colleton County residents only. Any non- resident caught in the act or caught through prima facie evidence shall be found in violation of this chapter. 2. Any person who improperly uses any Colleton County dumpster by placing the wrong materials not specifically called for disposal in said dumpster, such as placing metal in a “plastics only” dumpster, is in violation of this chapter. 3. Any person who shall deposit trash on the ground instead of in a dumpster is in violation of this chapter. 4. All commercial developments shall use their assigned ga rbage collection containers and maintain them in a clean, and aesthetically pleasing condition. All such containers shall be located on a site as and where approved by the collection agency, which shall be outside of any public right-of-way. 5. It is unlawful for any person to allow a refuse container to remain unemptied for more than ten consecutive days. A violation of this section may be abated by the county; provided, however, that the container in question may be impounded and a lien may be executed a gainst any property held in connection with the business of collecting refuse, waste, or garbage by the person alleged to be in violation of this section. 9.04.030. - Enforcement. A. All county animal, environmental, and litter control officers, and cod e enforcement officers, and all certified sheriff's deputies are considered compliance officers and they are empowered to enforce the provisions of this chapter. B. Only Sheriff’s deputies can execute warrants for arrest, but all compliance officers are empowered to issue citations, and other processes issued by the courts in enforcing the provisions of this chapter. In addition, the mailing by certified return- receipt-requested mail of such process to the violator’s last place of residence shall be deemed as personal service upon the person charged. C. Prima facie evidence. 1. If the throwing, dumping, or depositing of litter was done from a motor vehicle, except a motor bus, it shall be prima facie evidence that the throwing, dumping, or depositing was done by the driver of the motor vehicle. 2. If discarded litter can be identified with a person's name, it shall be prima facie evidence that the throwing, dumping, or depositing was done by the person whose name appears in the discarded litter. 9.04.040. - Penalties. A. Any person who violates any provision of this chapter is guilty of a misdemeanor and, upon conviction, must be fined not more than $500.00 and/or be imprisoned for a period of not less than two days nor more than 30 days. No fine imposed pursuant to this section may be suspended to less than $250.00. No sentence of imprisonment imposed pursuant to this section may be suspended. B. In addition to the fine or term of imprisonment, the court may also impose eight hours of litter-gathering labor for a first conviction, 16 hours for a second conviction, and 24 hours for a third or subsequent conviction, all under the supervision of the court; or such other term of litter-gathering labor or public service as the court deems appropriate. C. Any punishment including fines imposed pursuant to a conviction for a violation of this chapter shall be separate and apart from any cleanup or abatement costs incurred by the county in abating said littering; and shall be in addition to all other remedies available to the county under state law and local ordinances. 3. Severability: If any provision of this Ordinance or the application thereof to any person or circumstances is held invalid, the invalidity does not affect other provisions or applications of the Or dinance which can be given effect without the invalid provision or application and to this end, the provisions of this Ordinance are severable. 4. Conflict: Provisions in other County Ordinances, Resolutions, policies, or by -laws in conflict with this Ordinance are hereby repealed. ATTEST: SIGNED: ________________________ __________________________ Kaela Brinson, Council Clerk Steven D. Murdaugh, Chairman ____________________________ COUNCIL VOTE: Approved as to Form OPPOSED: Sean Thornton, County Attorney Sponsor(s) : County Council First Reading : March 1, 2022 I, ____________________, Committee Referral : N/A Council Clerk, certify that this Committee Consideration Date : N/A Ordinance was advertised for Committee Recommendation : N/A Public Hearing on _______. Second Reading : April 5, 2022 Public Hearing : May 3, 2022 Third Reading : May 3, 2022 Effective Date : Immediately ORDINANCE NO. 22-O-04 COUNCIL-ADMINISTRATOR FORM OF GOVERNMENT FOR COLLETON COUNTY [TO AMEND TITLE 13 – BUILDINGS AND CONSTRUCTION, CHAPTER 13.04 – CONSTRUCTION CODES ADOPTED, CHAPTER 13.12 – FLOOD DAMAGE PREVENTION, CHAPTER 13.16 – MANUFACTURED HOMES AND CHAPTER 13.20 – UNIFORM ORDINANCE SUMMONS , TO COINCIDE WITH THE TEN YEAR UPDATE OF THE COLLETON COUNTY COMPREHENSIVE PLAN.] WHEREAS: 1. Title 13 – Buildings and Construction, Chapter 13.04 – Construction Codes Adopted, Chapter 13.12 – Flood Damage Prevention, Chapter 13.16 – Manufactured Homes and Chapter 13.20 – Uniform Ordinance Summons , of the Colleton County Code of Ordinances were reviewed by the Planning Commission on October 26, 2020, November 23, 2022 and March 28, 2022; and 2. Chapters 13.04, 13.12, 13.16 and 13.20 were edited for legal sufficiency, redundancy and/or unnecessary words and phrases, and updated and clarified simplified phrases in order to be current with the accepted Amer ican Planning Association (APA) principles and practices; and 3. County Council believes it is in the best interest of the citizens of Colleton County to approve the changes set forth herein. NOW, THEREFORE, BE IT ORDAINED BY COLLETON COUNTY COUNCIL, DULY ASSEMBLED, THAT: 1. Title 13 – Buildings and Construction, Chapter 13.04 – Construction Codes Adopted, of the Colleton County Code of Laws (the same being inclusive of and one with the Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality to read as follows: CHAPTER 13.04. – BUILDING CODES ADOPTED Sections: 13.04.010. – Adoption by reference. 13.04.010. – Adoption by reference. A. 1. The following codes are adopted by reference as though they were copied herein fully: International Building Code—2018 Edition (IBC 2018), including Chapter 1; International Energy Conservation Code—2009 Edition; International Fire Code—2018 Edition (IFC 2018); International Fuel Gas Code—2018 Edition (IFGC 2018); International Mechanical Code—2018 Edition (IMC 2018); International Plumbing Code—2018 Edition (IPC 2018); International Residential Code —2018 Edition (IRC 2018), including Chapter 1; and International Swimming Pool and Spa Code—20182 Edition (ISPSC 2018); (International Codes will include South Carolina Modifications) National Electrical Code—2014 Edition; NFPA 70 – National Electric Code 2017 (NEC 2017) NFPA 101 Life Safety Code—2015 Edition; Standard for Residential Construction in High -Wind Regions ICC 600 —2008 Edition; Accessible and Usable Buildings and Facilities ICC A117.1—2009 Edition. 2. Accessory structure exemption wording is removed within the IBC and the IRC and replaced with the following language: One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 225 square feet are exempt from permits. B. Within said codes, when reference is made to the duties of a certain official named therein, that designated official of Colleton County, shall be responsible for enforcing the provisions of said code(s). C. Areas not affected. This chapter shall not affect any incorporated areas of the County of Colleton, unless an intergovernmental agreement exists between the County and the incorporated area, nor any parcel of land owned by the State of South Carolina or the federal government, or any buildings or installations placed thereon. D. Areas affected. Except for those portions of land excluded unde r subsection C above, this chapter shall cover all unincorporated portions of Colleton County. E. Contractor's licenses required. Every contractor or builder who shall make contracts for the construction or repair of buildings for which a county permit is required, and/or subletting the same or any part thereof, shall be required to secure a license from Colleton County. Applicants desiring to be licensed with the county as a general, residential, or mechanical contractor must file an application with the pl anning and development department, accompanied by the current license fee, and show proof of licensure by the State of South Carolina. F. Building code fees. Fees as established and updated periodically by county council, usually in the annual budget ordinance, shall apply as set forth in such ordinance. G. Violation of the construction codes as adopted by Colleton County is punishable by a $500.00 fine and/or up to 30 days in jail. Performing construction activities that require a Building, Zoning, or other required Permit, before acquiring the appropriate Permit(s), shall be punishable by a Double Permit Fee for each Permit required. Each day’s violation of any of provisions of these codes shall constitute a new and separate offense. 2. Title 13 – Buildings and Construction, Chapter 13.12 – Flood Damage Prevention , of the Colleton County Code of Laws (the same being inclusive of and one with the Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality to read as follows: CHAPTER 13.12. - FLOOD DAMAGE PREVENTION ARTICLE 13.12-1. - GENERAL PROVISIONS Sections: 13.12-1.010. - Statutory authorization. 13.12-1.020. - Findings of fact. 13.12-1.030. - Statement of purpose and objectives. 13.12-1.040. - Lands to which this chapter applies. 13.12-1.050. - Permit required. 13.12-1.060. - Compliance. 13.12-1.070. – Interpretation. 13.12-1.080. - Partial invalidity and severability. 13.12-1.090. – Warning and Disclaimer of Liability. 13.12-1.100. – Penalty. 13.12-1.010. - Statutory authorization. The Legislature of the State of South Carolina has in S.C. Code 1976, title 4, chapters 9 (article 1), 25, and 27, and amendments thereto, delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its residents. Therefore, the Colleton County council (governing body) of Colleton County, Walterboro, South Carolina, does ordain as follows. 13.12-1.020. - Findings of fact. The special flood hazard areas (SFHAs) of Colleton County are subject to periodic inundation which results in loss of life and property; health and safety hazards; disruption of commerce and governmental services; extraordinary public expenditures of flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety, and general welfare. Furthermore, these flood losses are caused by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities, and by the occupancy in SFHAs by uses vulnerable to floods or hazardous to other lands which are inadequately elevated, floodproofed, or otherwise unprotected from flood damages. 13.12-1.030. - Statement of purpose and objectives. A. It is the purpose of this chapter to promote the public health, safety, and general welfare and to minimize public/private losses due to flood conditions in specific areas by provisions designed to: 1. Restrict or prohibit uses which are dangerous to health, safety, and property due to water or erosion hazards, or which result in damaging increases in erosion or in flood heights or velocities; 2. Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction; 3. Control the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of flood waters; 4. Control filling, grading, dredging, and other development which may increase erosion or flood damage; and 5. Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands. B. The objectives of this chapter are: 1. To protect human life, health, and public and private property; 2. To minimize expenditure of public money for costly flood control projects; rescue and relief efforts; prolonged business interruptions; damage to public facilities and utilities such as water and gas mains, electric, telephone, and sewer lines; and streets and bridges located in floodplains; 3. To help maintain a stable tax base providing for the sound use and development of flood prone areas in such a manner as to minimize future flood blight areas; and 4. To insure that potential home buyers are notified that property is in a special flood hazard area (SFHA). 13.12-1.040. - Lands to which this chapter applies. This chapter shall apply to all SFHAs within the jurisdiction of Colleton County as identified by the Federal Emergency Management Agency (FEMA) in its Flood Insurance Study (FIS), dated December 21, 2017, with accompanying maps and other supporting data that are hereby adopted by reference and declared to be a part of this chapter. Upon annex ation any SFHAs identified by FEMA in its Flood Insurance Study for the unincorporated areas of Colleton County, with accompanying map and other data are adopted by reference and declared part of this chapter. 13.12-1.050. - Permit required. A building or zoning permit shall be required to be in conformance with the provisions of this chapter prior to the commencement of any development activities. 13.12-1.060. - Compliance. No structure or land shall hereafter be located, extended, converted, or structurally altered without full compliance with the terms of this chapter and other applicable regulations. 13.12-1.070. - Interpretation. In the interpretation and application of this chapter all provisions shall be considered as minimum requirements, liberally construed in favor of the governing body, and deemed neither to limit nor repeal any other powers granted under state law. This chapter is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. How ever, where this chapter and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail. 13.12-1.080. - Partial invalidity and severability. If any part of this chapter is declared invalid, the remainder of the chapter shall not be affected and shall remain in force. 13.12-1.090. - Warning and disclaimer of liability. The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering consideration. Larger floods can and will occur on rare occasions. Flood heights may be increased by man- made or natural causes. This chapter does not imply that land outside the SFHAs or uses permitted within such areas will be free from flooding or flood da mages. This chapter shall not create liability on the part of Colleton County or by any officer or employee thereof for any flood damages that result from reliance on this chapter or any administrative decision lawfully made hereunder. 13.12-1.100. – Penalty. Any person violating or failing to comply with the provisions of this Chapter shall be deemed guilty of a misdemeanor and upon conviction shall be fined not more than $500.00 or imprisoned for not more than 30 days for each such violation. Each da y on noncompliance with the provisions of this Chapter shall constitute a separate offense. ARTICLE 13.12-2. - DEFINITIONS Sections: 13.12-2.010. - General. 13.12-2.020. - Definitions. 13.12-2.010. - General. Unless specifically defined below, words or phrases used in this chapter shall be interpreted so as to give them the meaning they have in common usage and to give this chapter it’s most reasonable application. 13.12-2.020. - Definitions. Accessory structure (appurtenant structure) means structures that are located on the same lot as the principal structure and the use of which is incidental to the use of the principal structure; used for parking or storage only; walled and roofed; and small (less than 600 sq. ft. in A and AE flood zones and less than 100 sq. ft. in V and VE flood zones). Accessory structures should constitute a minimal investment, may not be used for human habitation, and be designed to have minimal flood damage potential. Examples of accessory structures are detached garages, carports, storage sheds, tool sheds, and small boathouses. Addition (to an existing building) means an extension or increase in the floor area and/or height of a building or structure and which shall comply with the requirements for new construction regardless as to whether the addition is a substantial improvement or not. Where a firewall or load -bearing wall is provided between the addition and the existing building, the addition shall be considered a separate building, and must comply with the standards for new construction. Agricultural structure (aquaculture structure farming conducted in water) means a structure used solely for agricultural purposes in which the use is exclusively in connection with the production, harvesting, storage, dry ing, or raising of agricultural commodities, including the raising of livestock. Agricultural structures are considered “walled and roofed” when the structure includes at least two outside rigid walls and a fully secured roof. Structures used for human ha bitation; employment or entertainment; multiple or mixed purposes, do not satisfy the “exclusive use” requirement. Agricultural structures are not exempt from the provisions of this chapter. Appeal means a request for a review of the floodplain administr ator's or CFM’s interpretation of any provision of this chapter. Area of shallow flooding means a designated AO or VO zone on a community's FIRM with base flood depths of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Area of special flood hazard (SFHA) means the land in the floodplain within a community subject to a one percent or greater chance of being equaled or exceeded in any given year. Base flood; Base Flood Elevation (BFE) means the flood having a one percent chance of being equaled or exceeded in any given year. BFE is the computed elevation to which floodwater is anticipated to rise during the Base Flood. Basement means any enclosed area of a building that is below grade on all sides. Building means any structure built for support, shelter, or enclosure for any occupancy or storage. Breakaway wall is a wall that is not part of the structural support of a building tha t is intended through its design and construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation systems. CFM is a Certified Flood Manager. Coastal high hazard area means a SFHA extending from offshore to the inland limit of the primary frontal dune along an open coast and any other area subject to velocity wave action from storms or seismic sources. Critical development means development critical to the com munity's public health and safety, is essential to the orderly functioning of a community, it stores and/or produces highly volatile, toxic, or water -reactive materials, or it houses occupants that may be insufficiently mobile to avoid loss of life or inju ry. Examples of critical developments include jails, hospitals, schools, fire stations, nursing homes, wastewater treatment facilities, water plants, and gas/oil/propane storage facilities. Design Flood Elevation (DFE) is the base flood elevation (BFE) plus freeboard of three (3) feet. Development means any man -made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or s torage of equipment or materials. Development includes the following; any change in the intensity of use of the land; previous man- made wetland or of any natural resource area; agriculture and forestry operations. Elevated building means a non -basement building constructed to have the lowest floor elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns, piers, or shear walls parallel to the flow of water. Enclosure, (enclosed space or area) means any space below the BFE and enclosed on all sides by walls or partitions. A V -zone building elevated on an open foundation without an enclosure or other obstructions below the BFE, is said to be free -of-obstruction, such that the space below the BFE is surrounded by in sect screening, louvered slats (wooden or plastic lattice, slats, or shutters are permissible if at least 40 percent of their area is open and that lattice can be no thicker than ½ inch, or that slats and shutters can be no thicker than one inch), or open wood lattice. Executive Order 11988 (Floodplain Management) . Issued by President Carter in 1977, this order requires that no federally assisted activities be conducted in or have the potential to affect identified SFHAs, unless there are no feasible alternatives. Existing construction means, for the purposes of determining rates, structures for which the start of construction commenced before April 14, 1987. Existing manufactured home park or subdivision means an existing manufactured home park or subdivision that was completed before April 7, 1987. Expansion to an existing manufactured home park or subdivision means adding more spaces to, and enlarging the park or subdivision which includes roads and utilities. FEMA is the Federal Emergency Management Agency. Flood means a general and temporary condition of partial or complete inundation of normally dry land areas from the overflow of inland or tidal waters, or the unusual and rapid accumulation of runoff of surface waters from any source. Flood hazard boundary map (FHBM) means an official map of a community, issued by FEMA, where the boundaries of the SFHAs have been defined as Zone A. Flood insurance rate map (FIRM) means an official map of a community, on which FEMA has delineated both the SF HAs and the risk premium zones applicable to the community. Flood insurance study (FIS) means the official report provided by FEMA which contains flood profiles, as well as the flood boundary floodway map and the water surface elevation of the base flood. Floodplain & Flood Prone Area means any land area susceptible to being inundated by water from any source. Floodplain management is the operation of an overall program of corrective and preventative measures for reducing flood damage with floodplain m anagement regulations. Floodplain management regulations is such federal, state, and local regulations, which provide standards for the purpose of flood damage prevention and reduction. Flood-resistant material means any building material capable of with standing direct and prolonged contact (minimum 72 hours) with floodwaters without sustaining damage that requires more than low-cost cosmetic repair. Please refer to Technical Bulletin 2, current edition, Flood-Resistant Materials for Buildings Located in SFHAs in Accordance with the NFIP document number FIA -TB-2, current edition, and available from FEMA. Class 4 and 5 materials, referenced therein, are acceptable flood-resistant materials. Floodway means the channel of a river or other watercourse and th e adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. Flood Zones – Special Flood Hazard Areas "A"-zone. Areas subject to inundation by the one -percent-annual-chance flood event. Because detailed hydraulic analyses have not been performed, no base flood elevations (BFEs) or flood depths are shown. "AE" zone. Areas subject to inundation by the one -percent-annual-chance flood event determined by detailed methods. BFEs are shown within these zones. "VE" zone. High risk areas subject to inundation by at least a one -percent-annual- chance flood event as determined by detailed methods, and where wave action is expected with wave heights of more than 3.0 feet. BFEs or base flood depths are shown within these zones. "X" zone (shaded). Moderate risk areas within the 0.2- percent-annual-chance floodplain, areas of one-percent-annual-chance flooding where the average depths are less than one foot. No BFEs or b ase flood depths are shown within these zones. "X" zone (unshaded). Minimal risk areas outside the one -percent and 0.2-percent- annual-chance floodplains. No BFEs or base flood depths are shown within these zones. Freeboard means a factor of safety usually expressed in feet above the established (BFE) for purposes of floodplain management. "Freeboard" tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed. Functionally dependent facility means a facility which cannot be used for its intended purpose unless it is located or carried out in close proximity to water, such as a docking or port facility necessary for the loading and unloading of cargo or passengers, shipbuilding, ship repair, or seafood processing facilities. The term does not include long- term storage, manufacture, sales, or service facilities. Highest adjacent grade (HAG) means the highest natural elevation of the ground surface, prior to construction, next to the proposed walls of the structure. Historic structure means any structure that is: A. Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of the Interior (DOI)) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; B. Certified or pre liminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the secretary to qualify as a registered historic district; C. Individually listed on a state inventory of historic places; D. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified: 1. By an approved state program as determined by the Secretary of Interior; or 2. Directly by the Secretary of Interior in states without approved programs. Some structures/districts listed on the state or local inventories may not be "historic" as cited above, but have been included on the inventories since it is believed that t he structures or districts have the potential for meeting the "historic" structure criteria of the DOI. In order for these structures to meet NFIP historic structure criteria, it must be demonstrated and evidenced that the South Carolina Department of Archives and History has individually determined the structure or district meets DOI historic structure criteria. Increased cost of compliance (ICC) . Applies to all new and renewed flood insurance policies effective on and after June 1, 1997. The NFIP shall enable the purchase of insurance to cover the cost of compliance with land use and control measures established under section 1361. It provides coverage for payment of a claim to help pay the cost to comply with State or community floodplain management laws or ordinances after a flood in which a building has been declared substantially or repetitively damaged. Limited storage means an area used for storage and intended to be limited to incidental items that can withstand exposure to the elements and have low flood damage potential. Such an area must be of flood resistant or breakaway material, void of utilities except for essential lighting and cannot be temperature controlled. If the area is located below the BFE in an A, AE and A1- A30 zone it must meet t he requirements of section 13.12- 4.010(E) of this chapter. If the area is located below the BFE in a V, VE and V1- V30 zone it must meet the requirements of section 13.12-4.060. Lowest adjacent grade (LAG) is an elevation of the lowest ground surface that touches any of the exterior walls of a building or proposed building walls. Lowest floor means the lowest floor of the lowest enclosed area. Any unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access, or storage in an area other than a basement area is not considered a building's lowest floor provided that such an enclosure is not built so as to render the structure in violation of other provisions of this chapter. Manufactured/mobile home means a structure desi gned to be a dwelling unit that is transportable in one or more sections, built on a permanent chassis, and designed to be used with or without a permanent foundation when connected to the required utilities. The term "manufactured/mobile home" does not include a recreational vehicles, travel trailers or motorized homes registered for travel on highways, nor modular buildings. Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lo ts for rent or sale. The term does not include the premises where unoccupied manufactured homes, whether new or used, are parked for the purpose of inspection, sale, storage or repair, or recreational vehicle parks. Mean sea level means for the purposes of this chapter, the National Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum (NAVD) of 1988, or other datum, to which the BFEs listed is shown on a community's FIRM. National Geodetic Vertical Datum (NGVD) means, as corrected in 1929, elevation reference points set by National Geodetic Survey based on mean sea level. North American Vertical Datum (NAVD) means the North American Vertical Datum (NAVD) Vertical control, as corrected in 1988, used as the reference datum on the FIRM. New construction means a structure for which the start of construction commenced after April 7, 1987. The term also includes any subsequent improvements to such structure. New manufactured home park or subdivision means a manufactured home park or subdivision where construction was completed on or after April 7, 1987. Pre-Development is the conditions that existed prior to land disturbance or redevelopment activity at the time of the application. Primary frontal dune means a continuous or nearly continuous mound or ridge of sand with relatively steep seaward and landward slopes immediately landward and subject to erosion and overtopping from high tides and waves during coastal storms. The inland limit of the primary frontal dune occurs at the point where there is a distinct change from a relatively steep slope to a relatively mild slope. Recreational vehicle means a vehicle which is: built on a single chassis; 400 square feet or less when measured at the largest horizontal projection; designed to be self -propelled or permanently towable by a light -duty truck; and, designed primarily not for use as a permanent dwelling, but as temporary living quarters for recreational, camping, travel, or seasonal use. Repetitive loss means a building covered by a contra ct for flood insurance that has incurred flood-related damages on two occasions during a ten- year period ending on the date of the event for which a second claim is made, in which the cost of repairing the flood damage, on the average, equaled or exceeded 25 percent of the market value of the building at the time of each such flood event. Section 1316 of the National Flood Insurance Act of 1968. The act provides that no new flood insurance shall be provided for any property found by FEMA to have been declared by a state or local authority to be in violation of state or local ordinances. Severe repetitive loss (SRL) property is flood-related damage property that has at least four claims for buildings and/or contents exceeding $5,000 or at least two buildi ng-only payments that cumulatively exceeds the market value of the building. Stable natural vegetation. The first place on the waterfront where plants such as sea oats hold sand in place. Start of construction (for other than new construction or substan tial improvements under the Coastal Barrier Resources Act (P.L. 97- 348)), includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction was within 180 days of the permit issue date. The actua l start means the first placement of permanent construction of a structure (including a manufactured home) on a site, such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation or the placement of a manufactured home on a foundation. Permanent construction does not include t he following: land preparation; clearing, grading, and filling; nor does it include the installation of streets and/or walkways; excavation for footings, piers or foundations, or the erection of temporary forms; the installation of accessory buildings, such as garages or sheds. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of the building, whether or not that alteration affects the external dimensions of the building. Structure means a walled and roofed building, a manufactured/mobile home, including a gas or liquid storage tank, or other man- made facility or infrastr ucture that is principally above ground. Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before -damaged condition would equal or exceed 49 percent of the market value of the struct ure before the damage occurred. Such repairs may be undertaken successively and their costs counted cumulatively. Please refer to the definition of "substantial improvement." Substantial improvement means any repair, reconstruction, rehabilitation, addit ion, or other improvement of a structure, the cost of which equals or exceeds 49 percent of the market value of the structure before the start of construction of the improvement. This term includes structures that have incurred substantial damage, regardless of the actual repair work performed. The term does not, however, include either: 1. Any project of improvement to a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions (does not include American with Disabilities Act compliance standards); or 2. Any alteration of a historic structure, provided that the alteration will no t preclude the structure's continued designation as a historic structure; 3. Permits shall be cumulative for a period of eight years. If the improvement project is conducted in phases, the total of all costs associated with each phase, beginning with the is suance of the first permit, shall be utilized to determine whether "substantial improvement" will occur. Substantially improved existing manufactured home park or subdivision means, where the repair, reconstruction, rehabilitation or improvement of the s treets, utilities and pads equals or exceeds 49 percent of the value of the streets, utilities and pads before the repair, reconstruction, or improvement commenced. Variance means a grant of relief from the requirements of this chapter as provided under the provisions of sections 13.12- 5.030 Historic Structures and 13.12- 5-050 Agricultural Structures only. Violation means the failure of a structure or other development to be fully compliant with these regulations. Watersheds is a land area that chann els rainfall and snowmelt to creeks, streams, and rivers, and eventually to outflow points such as reservoirs, bays, and the ocean. The watershed consists of surface water --lakes, streams, reservoirs, and wetlands --and all the underlying groundwater. ARTICLE 13.12-3. - ADMINISTRATION Sections: 13.12-3.010. - Designation of floodplain administrator. 13.12-3.020. - Adoption of letter of map revisions (LOMR). 13.12-3.030. – Reserved. 13.12-3.040. - Permitting and certification requirements. 13.12-3.050. – Duties and Responsibilities of the floodplain administrator and Certified Floodplain Manager. 13.12-3.060. – Administrative Procedures 13.12-3.010. - Designation of floodplain administrator. The planning and development director (director), the floodplain administrator, Certified Floodplain Manager (CFM) or director’s designee are hereby appointed to administer and implement the provisions of the ordinance codified in this chapter. 13.12-3.020. - Adoption of letter of map revisions (LOMR). Adopt all LOMRs that are issued in the areas identified in section 13.12-1.040. 13.12-3.040. - Permitting and certification requirements. A. Building/zoning permit applications shall be made to the floodplain administrator on appropriate forms prior to an y development activities. The permit application shall include, but not be limited to, two sets of plans drawn to scale showing: the nature, location, dimensions, and elevations of the area in question; existing or proposed structures; and the location of fill materials, storage areas, and drainage facilities. Specifically, the following information is required: 1. A plot plan that shows the 100- year floodplain contour or a statement that the entire lot is within the floodplain must be provided by the permit applicant when the lot is within or appears to be within the floodplain as mapped by FEMA or the floodplain identified pursuant to either subsection 13.12- 3.050(K) or sections 13.12-4.030 and 13.12- 4.040. The plot plan must be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. 2. Where BFE data is provided as set forth in section 13.12- 1.040 or subsection 13.12-3.050(K), the application for a permit within the SFHA shall show: a) The elevation (in relation to mean sea level) of the lowest floor of all new and substantially improved structures; and b) If the structure will be floodproofed in accordance with subsection 13.12- 4.020(B) requirements of the elevation (in relation to mean sea level) to which the structure will be floodproofed. 3. Where BFE data is not provided. If no BFE data is provided as set forth in section 13.12-1.040 or subsection 13.12- 3.050(K), then the provisions of section 13.12- 4.040 must be met. 4. Alteration of watercourse. Where any watercourse will be altered or relocated as a result of proposed development, the permit application shall include: a description of the extent of watercourse alteration or relocation; an engineering report on the effects of the proposed project on the flood- carrying capacity of the watercourse and the effects to properties located both upstream and downstream; and, a map showing the location of the proposed watercourse alteration or relocation. B. Certifications. 1. Floodproofing certification. When a structure is floodproofed, the applicant shall provide certification from a registered, professional engineer that the nonresidential, floodproofed structure meets the floodproofing criteria in the non -residential construction requirements of subsection 13.12-4.020(B). 2. Elevation Certification (EC). Each EC submission must pass inspection in order to proceed to the next phase of the project. a) Before structural development. First construction drawing EC is submitted based on the structural blueprints and detailed site plans. This submission is required in order to review the permit application. b) During construction. A lowest floor elevation (building under construction EC) or floodproofing certification is required after the lowest floor is completed. As soon as possible after completion of the lowest floor and before any further vertical construction commences, or floodproofing by whatever construction means, whichever is applicable, it shall be the duty of the permit holder to submit to the floodplain administrator a certification of the elevation of the lowest floor, or floodproofed elevation, whichever is applicable, as built, in relation to mean sea level. Said certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer. Any work done prior to submission of the certification shall be at the permit holder's risk. The floodplain administrator shall review the floor elevation survey data submitted. The permit holder immediately and pri or to further progressive work being permitted to proceed shall correct deficiencies detected by such review. Failure to submit the survey or failure to make said corrections required hereby shall be cause to issue a stop work order for the project. c) Final grading and completed structure. The final EC should be completed after final grading is completed and before the call to inspect to get a CO and request for permanent power. 3. V-Zone certification. When a structure is located in zones V, VE, or V1- 30, certification shall be provided from a registered professional engineer, separate from submitted plans, that new construction and substantial improvement meets the criteria for the coastal high hazard areas outlined in section 13.12- 4.060, Coastal High Hazard Areas (V-Zones). 4. As-built certification. Upon completion of the development a registered professional engineer, or land surveyor, in accordance with SC law, shall certify according to the requirements of subsections 13.12- 3.040(B)(1), (B)(2), and (B)(3 ) of this section that the development is built in accordance with the submitted plans and previous pre - development certifications. 13.12-3.050. - Duties and responsibilities of the floodplain administrator and Certified Floodplain Manager (CFM). Duties of the floodplain administrator and CFM shall include, but not be limited to: A. Permit review. Review all building and zoning permits located within a SFHA to assure that the requirements of this chapter have been satisfied. B. Requirement of federal and/or state permits. Advise permittee that additional federal or state permits may be required, and if specific federal or state permits are known, require that copies of such permits be provided and maintained on file with the building permit. C. Watercourse alterations. 1. Notify adjacent communities and the South Carolina Department of Natural Resources (SCDNR), Land Resources and Conservation Districts Division, State Coordinator for the NFIP, prior to any alteration or relocation of a watercourse, and submit evidence of such notification to FEMA 2. In addition to the notifications required, watercourse alterations per subsection 13.12-3.050(C)(1), written reports of maintenance records must be maintained to show that maintenance has been provided within t he altered or relocated portion of said watercourse so that the flood- carrying capacity is not diminished. This maintenance must consist of a comprehensive program of periodic inspections, and routine channel clearing and dredging, or other related functio ns. The assurance shall consist of a description of maintenance activities, frequency of performance, and the local official responsible for maintenance performance. Records shall be kept on file for FEMA inspection. 3. If the proposed project will impact the configuration of the watercourse, floodway, or BFE for which a detailed flood insurance study has been developed, the applicant shall apply for and must receive approval for a conditional letter of map revision (CLOMR) with FEMA prior to the start of actual construction. 4. Within 60 days of completion of an alteration of a watercourse, referenced in the certification requirements of subsection 13.12- 3.040(B)(4), the applicant shall submit as-built certification, by a registered professional engineer, to FEMA. D. Floodway encroachments. Prevent encroachments within floodways unless the certification and flood hazard reduction provisions of subsection 13.12- 4.020(E) are met. E. Adjoining floodplains. Cooperate with neighboring communities with respect to the management of adjoining floodplains and/or flood- related erosion areas in order to prevent aggravation of existing hazards. F. Notifying adjacent communities. Notify adjacent communities prior to permitting substantial commercial developments and large subdivisions to be undertaken in SFHAs and/or flood-related erosion hazards. G. Certification requirements. 1. Obtain and review actual elevation (in relation to mean sea level) of the lowest floor of all new or substantially improved structures, in accordance with administrative procedures outlined in subsection 13.12- 3.040(B)(2) or the coastal high hazard area requirements outlined in subsection 13.12-4.060(E). 2. Obtain the actual elevation (in relation to mean sea level) to which the new or substantially improved structures have been floodproofed, in accordance with the floodproofing certification outlined in subsection 13.12-3.040(B)(1). 3. When floodproofing is utilized for a particular structure, obtain certifications from a registered professional engineer in accordance with the nonresidential construction requirements outlined in subsection 13.12-4.020(B). 4. A registered professional engineer shall certify that the design, specifications and plans for construction are in compliance with the provisions conta ined in the coastal high hazard area requirements outlined in subsections 13.12- 4.060(D), (F) and (H) of this chapter. H. Map interpretation. Where interpretation is needed as to the exact location of boundaries of the SFHA (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), the floodplain administrator shall make the necessary interpretation. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpr etation as provided in subsection 13.12-3.050(L). I. Prevailing authority. Where a map boundary showing an SFHA and field elevations disagree, the BFEs for flood protection elevations (as found on an elevation profile, floodway data table, etc.) shall prevail. The correct information should be submitted to FEMA as per the map maintenance activity requirements outlined in subsection 13.12-4.020(G). J. Use of best available data. When BFE data or floodway data has not been provided in accordance with section 13 .12-1.040, obtain, review, and reasonably utilize best available BFE and floodway data available from a federal, state, or other source, including data developed pursuant to the standards for subdivision proposals outlined in section 13.12-4.040 in order to administer the provisions of this chapter. Data from preliminary, draft, and final flood insurance studies constitutes best available data from a federal, state, or other source. Data must be developed using hydraulic models meeting the minimum requireme nt of NFIP approved model. If an appeal is pending on the study in accordance with 44 CFR ch. 1, parts 67.5 and 67.6, the data does not have to be used. K. Special flood hazard area/topographic boundaries conflict. When the exact location of boundaries of the SFHAs conflict with the current, natural topography information at the site the property owner may apply and be approved for a letter of map amendment (LOMA) by FEMA. The floodplain administrator in the permit file will maintain a copy of the LOMA issued from FEMA. L. On-site inspections. Make on- site inspections of projects in accordance with the administrative procedures outlined in subsection 13.12-3.060(D). M. Administrative notices. Serve notices of violations, issue stop work orders, revoke permits and take corrective actions in accordance with the administrative procedures in section 13.12-3.060. N. Records maintenance. Maintain all records pertaining to the administration of this chapter and make these records available for public inspection. O. Annexations and detachments. Notify the South Carolina Department of Natural Resources (SCDNR) Land, Water and Conservation Division, within six months, of any annexations or detachments that include SFHAs. P. Federally funded development. The President issued E xecutive Order 11988, Floodplain Management May 1977. E.O. 11988 directs federal agencies to assert a leadership role in reducing flood losses and losses to environmental values served by floodplains. Proposed developments must go through an eight -step rev iew process. Evidence of compliance with the executive order must be submitted as part of the permit review process. Q. Substantial damage determination. Perform an assessment of damage from any origin to the structure using FEMA’s Residential Substantial D amage Estimator (RSDE) software or another approved method (SCDNR Application) to determine if the damage equals or exceeds 50 percent of the market value of the structure before the damage occurred. R. Substantial improvement determinations. Perform an ass essment of permit applications for improvements or repairs to be made which equals or exceeds 49 percent of the market value of the structure before the improvement or repair is started. Cost of work counted for determining if and when substantial improvement to a structure occurs shall be cumulative for a period of eight years. If the improvement project is conducted in phases the total cost of all phases shall be used to determine whether "substantial improvement" will occur. S. Methods of market value determination. Market values shall be determined by one of the following: 1. The current assessed building value determined by the county assessor's office; or 2. A certified appraisal from a registered professional licensed appraiser performed in accordance with South Carolina laws, within the past six months. The appraisal shall indicate actual replacement value of the building or structure in its pre - improvement condition, less depreciation for functionality, obsolescence, and site improvements; or 3. The Marshall and Swift Residential Cost Handbook may be used to determine costs for buildings or structures; or 4. A real estate purchase contract within 06 months prior to the date of the application for a permit. 13.12-3.060. - Administrative procedures. A. Inspections of work in progress. As the work progresses, the floodplain administrator shall make as many inspections of the work as needed to ensure the work is being done according to code and the terms of the permit. The floodplain administrator has a right, upon presentation of proper credentials, to enter on any premises within the county’s jurisdiction, at any reasonable hour, for the purposes of inspection or other enforcement action. B. Stop-work orders. Whenever a building or part thereof is being constructed, reconstructed, altered, or repaired in violation of this chapter, or without the proper permits, the floodplain administrator may order the work to be immediately stopped. The stop-work order shall be in writing, directed to the person doing t he work, state the specific work to be stopped, the specific reasons for the stoppage, and the conditions under which the work may be resumed. Violation of a stop- work order constitutes a misdemeanor. If the stop- work-order is issued due to a lack of perm its being pulled for the work being performed, the violator shall be required to pay a double permit fee for each permit needed before work can recommence. Failure to pay the double permit fees before work recommences shall initiate a citation where a court date will be assigned. C. Revocation of permits. The floodplain administrator may revoke and require the return of the development permit by notifying the permit holder in writing, stating the reason, such as: any substantial departure from the approved application, plans, or specifications; refusal or failure to comply with state or local laws; or, for false statements or misrepresentations made in securing the permit. Any permit mistakenly issued in violation of an applicable state or local law may also be revoked. D. Periodic inspections. The floodplain administrator and other designated county compliance officers shall have a right, upon presentation of proper credentials, to enter on any premises within the county’s jurisdiction, at any reasonable hour for the purposes of inspection or other enforcement action. E. Violations to be corrected. When the floodplain administrator finds violations of applicable state and local laws, it shall be their duty to notify the owner or occupant of the building of the violation. The owner or occupant shall immediately remedy each of the violations of law. F. Actions in event of failure to take corrective action. If the owner of a building or property fails to take prompt corrective action, the floodplain administrator shall give him written notice, by certified or registered mail to his last known address or by personal service, that: 1. The building or property is in violation of this chapter and appropriate section; 2. A hearing will be held before the floodplain administ rator at a designated place and time, not later than ten days after the date of the notice, at which time the owner shall be entitled to be heard in person or by counsel and to present arguments and evidence pertaining to the matter; and 3. Following the hearing, the floodplain administrator may issue such order to alter, vacate, or demolish the building; or to remove fill as appears appropriate. G. Order to take corrective action. If, upon a hearing held pursuant to the notice prescribed above, the floodplain administrator finds the building or development is in violation of this chapter, they shall make a written order to the owner, requiring them to remedy the violation within a period of not less than 60 days, unless the floodplain administrator finds that there is imminent danger to life or property, they may order that violation be remedied immediately, or in less than 60 days, as may be feasible. H. Appeal. Any owner who has received an order to take corrective action may appeal said order to the local el ected governing body by giving written notice of appeal to the floodplain administrator and the clerk of council within ten days following issuance of the order. In the event no appeal is made within 10 days, the order shall be final. The local governing b ody shall hear an appeal within a reasonable time and may affirm, modify and affirm, or revoke the order. I. Failure to comply with order. If the owner fails to comply with an order of corrective action, where no appeal was taken, or fails to comply with an order of the governing body following an appeal, they shall be guilty of a misdemeanor and punished at the discretion of the court. J. Denial of flood insurance under the NFIP. If a structure remains in violation of this chapter after all other penalties are exhausted to achieve compliance, then the floodplain administrator shall notify FEMA to initiate a Section 1316 of the National Flood insurance Act of 1968, finding that the violator refuses to bring the violation into compliance with this chapter. If a violation has been remedied, the floodplain administrator shall notify FEMA and ask that the Section 1316 be rescinded. ARTICLE 13.12-4. - PROVISIONS FOR FLOOD HAZARD REDUCTION Sections: 13.12-4.010. - General standards. 13.12-4.020. - Specific standards. 13.12-4.030. – Standards for subdivision proposals. 13.12-4.040. – Standards for streams without established BFEs and/or floodways. 13.12-4.050. – Standards for streams with established BFEs but without floodways. 13.12-4.060. – Coastal high hazard areas (V-zones). 13.12-4.010. - General standards. Development may not occur in the floodplain where alternative locations exist due to the inherent hazards and risks involved. Before a permit is issued, the applicant shall demonstrate that new structures cannot be located out of the floodplain and that encroachments into the floodplain are minimized. In all SFHAs the following provisions shall apply: A. Reasonably safe from flooding. Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding. B. Anchoring. All new construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure. C. Flood resistant materials and equipment. All new construction and substantial improvements shall be constructed with flood resistant materials and use utility equipment resistant to minimize flood damage in accordance with Technical Bulletin 2, current edition, Flood Damage Resistant Materials Requirements. D. Minimize flood damage. All new construction and substantial improvements shall be constructed by methods and practices that minimize flood damages. E. Critical development. Shall be elevated to the 500 -year flood elevation or the highest known historica l flood elevation (where records exist), whichever is greater. If no data exists establishing either of the above, the applicant shall provide a hydrologic and hydraulic engineering analysis that generates 500-year flood elevation data. F. Utilities. All ne w and replacement electrical, ventilation, plumbing, heating and air conditioning equipment (including ductwork), and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within components during conditions of the base flood plus three feet . This requirement does not preclude the installation of outdoor faucets for shower heads, sinks, hoses, etc., as long as cut off devices and back flow devices are installed to prevent contamination to the service components and thereby minimize any flood damages to the building. No utilities or components shall be attached to breakaway walls. G. Water supply systems. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. H. Sanitary sewage systems. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters. On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding. I. Gas or liquid storage tanks. All gas or liquid storage tanks, either located above ground or buried, shall be anchored to prevent f lotation and/or lateral movement resulting from hydrodynamic and hydrostatic loads. J. Alteration, repair, reconstruction, or improvements. Any alteration, repair, reconstruction, or improvement to a structure in compliance with this chapter, shall also meet the requirements of "new construction" as contained in this chapter, including post-FIRM development and structures. K. Nonconforming buildings or uses. Nonconforming buildings or uses may not be enlarged, replaced, or rebuilt unless such enlargement or r econstruction is accomplished in conformance with the provisions of this chapter. Provided, however, nothing in this chapter shall prevent the repair, reconstruction, or replacement of an existing building or structure located totally or partially within the floodway, provided that the building or structure located below the DFE in the floodway is not increased or expanded. L. American with Disabilities Act (ADA). A building is required to meet the specific standards for floodplain construction outlined in s ection 13.12- 4.020, and all applicable ADA requirements. The ADA is not justification for issuing a variance or otherwise waiving these requirements. Also, the cost of improvements required to meet the ADA provisions shall be included in the costs of the i mprovements for calculating substantial improvement. 13.12-4.020. - Specific standards. In all SFHAs (zones A, AE, V, and VE) where the DFE (BFE plus freeboard) is three (3) feet and the BFE data has been provided, as set forth in section 13.12-1.040 or outlined in section 13.12-3.050 the following provisions are required: A. Residential construction. New construction and substantial improvement of any residential structure (including manufactured homes) shall have the lowest floor elevated no lower than the DFE No basements are permitted. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with the elevated buildings requirements in subsection 13.12-4.020(D). B. Nonresidential construction. 1. New construction and substantial improvement of any commercial, industrial, or non-residential structure shall meet the same standards as residential construction. Structures located in A -zones m ay be floodproofed in lieu of being elevated, provided that all areas of the structure below the required elevation are watertight with walls substantially impermeable to the passage of water, using structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. 2. A registered, professional engineer shall certify that the standards of this subsection are satisfied. Such certifications shall be provided to the floodplain administrator as set forth in th e floodproofing certification requirements in subsection 13.12- 3.040(B)(1). A variance may be considered for wet - floodproofing agricultural structures in accordance with the criteria outlined in section 13.12- 5.040 if no other viable location for the struc ture can be found. Agricultural structures not meeting the criteria of section 13.12- 5.040 must meet the nonresidential construction standards and all other applicable provisions of this chapter. Structures that are floodproofed are required to have an approved maintenance plan with an annual exercise. The floodplain administrator must approve the maintenance plan and receive notification of the annual exercises. C. Manufactured homes. 1. Manufactured homes that are placed or substantially improved on sites located: outside a manufactured home park or subdivision; in a new manufactured home park or sub- division; in an expansion to an existing manufactured home park or subdivision; or, in an existing manufactured home park or subdivision must be elevated on a pe rmanent foundation such that the lowest floor of the manufactured home is elevated no lower than the DFE and be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. 2. Manufactured homes must be anchored to resist flotation, collapse, and lateral movement in accordance with Section 40 -29-10 of the South Carolina Manufactured Housing Board Regulations, as amended. Additionally, when the elevation requirement would be met by an elevation of the cha ssis 36 inches or less above the grade at the site, the chassis shall be supported by reinforced piers or an engineered foundation. When the elevation of the chassis is above 36 inches in height an engineering certification is required. 3. An evacuation pla n must be developed for evacuation of all residents of all new, substantially improved or substantially damaged manufactured home parks or subdivisions located within flood-prone areas. This plan shall be filed with and approved by the floodplain administr ator and the local emergency preparedness coordinator. D. Elevated buildings. New construction and substantial improvements of elevated buildings that include fully enclosed areas that are usable solely for the parking of vehicles, building access, or limit ed storage in an area other than a basement, and which are subject to flooding shall be designed to preclude finished space and automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. 1. Designs f or complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria: a) Provide a minimum of two openings on different walls having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding; b) The bottom of all openings shall be no higher than one foot above the higher of the interior or exterior grade immediately under the opening; c) Openings may be equipped with screens, louvers, valves , or other coverings or devices provided they permit the automatic flow of floodwaters in both directions; and d) Fill placed around foundation walls must be graded so that the grade inside the enclosed area is equal to or higher than the adjacent grade outside the building on at least one side of the building. e) Only the portions of openings that are below the BFE can be counted towards the required net open area. 2. Hazardous velocities. Hydrodynamic pressure must be considered in the design of any foundati on system where velocity waters or the potential for debris flow exists. If flood velocities are in excess of five feet per second or greater, foundation systems other than solid foundations walls should be considered so that obstructions to damaging flood flows are minimized. 3. Enclosures below BFE. a) Access to the enclosed area shall be the minimum necessary to allow for parking of vehicles (garage door) or limited storage of maintenance equipment used in connection with the premises (standard exterior door) or entry to the living area (stairway or elevator). b) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms, except to enclose a single storage area and must be void of utilities except for essential lighting as required, and cannot be temperature controlled. c) One wet location switch and/or outlet connected to a ground fault interrupt breaker may be installed below the required lowest floor elevation specified in the specific standards outlined in subsections 13.12- 4.020(A), (B) and (C) of this ordinance . d) All construction materials below the required lowest floor elevation specified in the specific standards outlined in subsections 13.12- 4.020(A), (B) and (C) of this chapter should be of flood resistant materials. E. Floodways. Located within SFHAs established in section 13.12- 1.040, are areas designated as floodways. The floodway is an extremely hazardous area due to the velocity of floodwaters that carry debris and potential projectiles and which could potentially cause erosion. The following provisions shall apply within such areas: 1. No encroachments, including fill, new construction, substantial improvements, additions, and/or other developments shall be permitted unless: a) It has been demonstrated throu gh hydrologic and hydraulic analyses and/or No- Impact performed by a registered professional engineer certifying that the proposed encroachment would not result in any increase in the flood levels during the occurrence of the base flood. Such certification and technical data shall be presented to the fl oodplain administrator; and/or, b) A CLOMR has been approved by FEMA. A letter of map revision must be obtained upon completion of the proposed development. 2. If subsection 13.12-4.020(E)(1), Floodways, is sati sfied, then all shall comply with all applicable flood hazard reduction provisions of article 13.12-4. 3. No manufactured homes shall be permitted, except in an existing manufactured home park or subdivision. A replacement manufactured home may be placed on a lot in an existing manufactured home park or subdivision provided the anchoring and the elevation standards of subsection 13.12- 4.020(C) are met. 4. Permissible uses within floodways may include general farming, pasture, outdoor plant nurseries, horticult ure, forestry, wildlife sanctuary, game farm, and other similar agricultural, wildlife, and related uses. Also, lawns, gardens, play areas, picnic grounds, and hiking and horseback riding trails are acceptable uses, provided that they do not employ structures or fill. Substantial development of a permissible use may require a No- Impact certification. The uses listed in this subsection are permissible only if and to the extent that they do not cause any increase in BFEs or changes to the floodway configuration. F. Recreational vehicles, park model trailers and campers. 1. A recreational vehicle is ready for highway use if it is: a) On wheels or jacking system; b) Attached to the site only by quick -disconnect type utilities and security devices; and c) Has no permanently attached additions. 2. Recreational vehicles placed on sites shall either be: a) On site for fewer than 90 consecutive days; and b) Be registered with SCDMV and ready for highway use, or meet the permit and certification requirements of section 13.12- 3.040, general standards outlined in section 13.12- 4.010, and manufactured homes standards in subsection 13.12-4.020(C). G. Map maintenance activities. The NFIP requires flood data to be reviewed and approved by FEMA. This ensures that flood maps, studies and other data identified in section 13.12- 1.040 accurately represent flooding conditions so appropriate floodplain management criteria are based on current data, the following map maintenance activities are identified: 1. Requirement to submit new technical data. a) For all development proposals that impact floodway delineations or BFEs, the community shall ensure that technical data reflecting such changes be submitted to FEMA within six months of the date such information becomes available. These development proposals include, but are not limited to: i. Floodway encroachments that increase or decrease BFEs or alter floodway boundaries; ii. Fill sites to be used for the placement of proposed structures where the applicant desires to remove the site from the SFHA; iii. Alteration of watercourses that result in a relocation or elimination of the SFHA, including the placement of culverts; and iv. Subdivision or large scale, residential or commercial development proposals requiring the establishment of BFEs in accordance with section 13.12-4.030. b) It is the responsibility of the applicant to have technical data, required in accordance with subsection 13.12-4.020(G), prepared in a format required for a CLOMR or LOMR and submitted to FEMA. Submittal and processing fees for these map revisions shall be the responsibility of the applicant. c) The floodplain administrator shall require a CLOMR prior to the issuance of a permit for: i. Proposed floodway encroachments that increase the BFE; and ii. Proposed development which increases the B FE by more than one foot in areas where FEMA has provided BFEs but no floodway. d) Permits approved by the floodplain administrator shall be conditioned upon the applicant obtaining a LOMR from FEMA for any development proposal subject to subsection 13.12-4.020(G). 2. Right to submit new technical data. The floodplain administrator may request changes to any of the information shown on an effective map that does not impact floodplain or floodway delineations or BFEs, such as labeling or planimetric details. S uch a submission shall include appropriate supporting documentation made in writing by the local jurisdiction and may be submitted at any time. H. Accessory structures. 1. A detached accessory structure, with a value in excess of $3,000.00, must comply with the requirements of FEMA's Technical Bulletin 7, current edition, Wet Floodproofing Requirements, or be elevated in accordance with subsections 13.12- 4.020(A) and (D), or be dry floodproofed in accordance with subsection 13.12-4.020(B). 2. When accessory st ructures of $3,000.00 or less are placed in a SFHA, the following additional criteria shall be met: a) Accessory structures shall not be used for any type of human habitation such as work, sleeping, living, cooking or having restroom facilities or amenities; b) Accessory structure shall not be larger than a one- story two – car garage, approximately 600 sq. ft. in SFHAs other than coastal high hazard areas (A and AE) c) Accessory structure shall not be larger than 100 sq. ft. in coastal high hazard areas (V and VE) d) Accessory structures shall be designed, constructed, and placed on the building site to: have low flood damage potential; offer the minimum resistance to the flow of floodwaters; and be firmly anchored to prevent flotation, collapse or lateral movement. e) Service facilities such as electrical and heating equipment shall be installed in accordance with subsection 13.12-4.010(F); and f) Openings to relieve hydrostatic pressure during a flood shall be provided below BFE in conformance with subsection 13.12-4.020(D)(1). g) Accessory structures shall be built with flood resistance materials in accordance with technical Bulletin 2, Flood Damage -Resistant Materials Requirements, current edition, and available from FEMA Class 4 and 5 materials, referenced therein are acceptable. 3. Swimming pool utility equipment rooms. If the building cannot be built at or above the DFE because of functionality of the equipment, then a structure to house the pool equipment may be built below the DFE with the following provisions: a) Meet the requirements for accessory structures in subsection 13.12-4.020(H). b) The utilities must be anchored to prevent flotation and shall be designed to prevent water from entering or accumulating within the components during conditions of the base flood. c) A variance may be granted to allow wet floodproofing of the structure. 4. Elevators. a) Installing a float switch system or other system that provides the same level of safety is necessary for all elevators where there is a potential for the elevator cab to descend below the BFE during a flood per FEMA's Technical Bulletin 4(TB-4) Elevator Installation for Buildings Located in Special Flood Hazard Areas, current edition. b) All equipment that must be installed below the BFE such as counter weight roller guide s, compensation cable and pulleys, and oil buffers for traction elevators and the jack assembly for a hydraulic elevator must be constructed using flood-resistant materials where possible per FEMA's TB-4. I. Fill. An applicant shall demonstrate through a si te plan drawn by a registered professional engineer that fill is the only alternative to raising the building to meet the residential and non- residential construction requirements of subsections 13.12-4.020(A) and 13.12- 4.020(B), and that the amount of fil l used will not affect the flood storage capacity or adversely affect adjacent properties. The following provisions shall apply to all fill placed in the SFHA: 1. Fill shall not be placed in the floodway unless it is in accordance with the requirements in subsection 13.12-4.020(E)(1); 2. Fill shall not be placed in tidal or non-tidal wetlands without the required state and federal permits; 3. Fill must consist of soil and rock materials only. A registered professional geotechnical engineer may use dredged material as fill only upon certification of suitability. Landfills, rubble fills, dumps, and sanitary fills are not permitted in the floodplain; 4. Fill used to support structures must comply with ASTM Standard D -698, and its suitability to support structures c ertified by a registered, professional engineer; 5. Fill slopes shall not have a slope ratio greater or steeper than two horizontal to one vertical, as designed by a registered professional engineer. Flatter slopes may be required where velocities may result in erosion; 6. The use of fill shall not increase flooding or cause drainage problems on neighboring properties; 7. Fill may not be used for structural support in the coastal high hazard areas; and 8. The fill will meet the requirements of FEMA Technical Bu lletin 10, current edition, Ensuring That Structures Built On Fill In Or Near Special Flood Hazard Areas Are Reasonably Safe From Flooding. 13.12-4.030. - Standards for subdivision proposals. A. All subdivision proposals and other proposed new development shall be consistent with the need to minimize flood damage and are subject to all applicable standards in these regulations and in Title 14, Land Management, Chapters 14.04 and 14.08 as applicable for subdivisions. B. All subdivision and other proposed new development proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage. C. All subdivision and other proposed new development proposals shall have adequate drainage provided to reduce exposure to flood damage. D. The applicant shall meet the requirement to submit technical data to FEMA in subsection 13.12-4.020(G) when a hydrologic and hydraulic analysis is completed that generates BFEs. 13.12-4.040. - Standards for streams without established BFEs and/or floodways. Located within SFHAs (zones A and V) established in section 13.12- 1.040, are small streams where no BFE data has been provided or where no floodways have been identified. The following provisions apply within such areas: A. In all SFHAs where BFE data is not available, the applicant shall provide a hydrologic and hydraulic engineering analysis that generates BFEs for all subdivision proposals and other proposed developments containing at least 50 lots or five acres, whichever is less. B. No encroachments, including fill, new construction, substantial improvements or new development shall be permitted within 100 feet of the stream bank unless certification with supporting technical data by a registered, pr ofessional engineer is provided demonstrating that such encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge. C. If subsection 13.12- 4.040(A) is satisfied and BFE data is available from other sources, all new construction and substantial improvements within such areas shall comply with all applicable flood hazard ordinance provisions of article 13.12-4 and shall be elevated or flood proofed in accordance with elevations established in subsection 13.12-3.030(K). 1. Data from preliminary, draft, and final flood insurance studies constitutes best available data. Refer to FEMA Floodplain Management Technical Bulletin 1 Use of Flood Insurance Study (FIS) Data as Available Data, current edition. If an appeal is pending on the study in accordance with 44 CFR ch. 1, parts 67.5 and 67.6, the data does not have to be used. 2. When BFE data is not available from a federal, state, or other source, one of the following methods may be used to determine a BFE. For furt her information regarding the methods for determining BFEs listed below, refer to FEMA's manual Managing Floodplain Development in Approximate Zone A Areas: a. Contour interpolation: i. Superimpose approximate Zone A boundaries onto a topographic map and estimate a BFE. ii. Add one-half of the contour interval of the topographic map that is used to the BFE. b. Data extrapolation. A BFE can be determined if a site within 500 feet upstream of a reach of a stream for which a 100 -year profile has been computed by detai led methods, and the floodplain and channel bottom slope characteristics are relatively similar to the downstream reaches. No hydraulic structures shall be present. c. Hydrologic and hydraulic calculations. Perform hydrologic and hydraulic calculations to d etermine BFEs using FEMA approved methods and software. 13.12-4.050. - Standards for streams with established BFEs but without floodways. Along rivers and streams where BFE data is provided without a floodway are identified for a SFHA on the FIRM or in the FIS. The following provisions apply within such areas: A. No encroachments, including fill, new construction, substantial improvements, or other development, shall be permitted unless certification with supporting technical data by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. 13.12-4.060. - Coastal high hazard areas (V-zones). Located within the SFHAss established in section 13.12- 1.040, Lands, or subsection 13.12-3.050(K) are areas designated as coastal high hazard areas. These areas have special flood hazards associated with wave wash. The following provisions shall apply within such areas: A. All buildings or structures shall be located landward of the first line of stable natural vegetation and comply with all applicable DHEC and OCRM setback requirements. B. All new construction and substantial improvements shall be elevated so that the bottom of the lowest supporting horizontal structural member (excluding pilings or columns) of the lowest floor is located no lower than three foot above the BFE. C. All buildings or structures shall be securely anchored on pilings or columns, extending vertically below a grade of sufficient depth and the zone of potential scour, and securely anchored to the subsoil strata. D. All pilings and columns and the attac hed structures shall be anchored to resist flotation, collapse, lateral movement and scour due to the effect of wind and water loads acting simultaneously on all building components. E. A registered professional engineer shall certify that the design, speci fications and plans for construction are in compliance with the provisions contained in subsections 13.12-4.060(C), (D), and (F). F. There shall be no fill used as structural support. Non- compacted fill may be used around the perimeter of a building for landscaping/aesthetic purposes provided the fill will wash out from storm surge, thereby rendering the building free of obstruction prior to generating excessive loading forces, ramping effects, or wave deflection. Only beach compatible sand may be used. The floodplain administrator shall approve design plans for landscaping/aesthetic fill only after the applicant has provided an analysis by an engineer, and/or soil scientist that demonstrates that the following factors have been fully considered: 1. Particle composition of fill material does not have a tendency for excessive natural compaction; 2. Volume and distribution of fill will not cause wave deflection to adjacent properties; and 3. Slope of fill will not cause wave run-up or ramping. G. There shall be no al teration of sand dunes that would increase potential flood damage. H. All new construction and substantial improvements have the space below the lowest floor either free of obstruction or constructed with non- supporting breakaway walls, open wood lattice-work, or insect screening intended to collapse under wind and water loads without causing collapse, displacement, or other structural damage to the elevated portion of the building or supporting foundation system. For the purpose of this section, a breakaway wall shall have a design safe loading resistance of not less than ten and no more than 20 pounds per square foot. Breakaway wall enclosures shall not exceed 299 square feet. Only flood resistant materials shall be used below the required flood elevation s pecified in 13.12-4.010(C). One wet location switch and/or outlet connected to a ground fault interrupt breaker may be installed below the required lowest floor elevation specified in 13.12-4.010(E). Use of breakaway walls which exceed a design safe load ing resistance of 20 pounds per square foot may be permitted only if a registered professional engineer certifies that the designs proposed meet the following conditions: 1. Breakaway wall collapse shall result from water load less than that which would occur during the base flood. 2. The elevated portion of the building and supporting foundation system shall not be subject to collapse, displacement, or other structural damage due to the effects of wind and water loads acting simultaneously on all building components (structural and nonstructural). The water loading shall be those values associated with the base flood. The wind loading values shall be those required by applicable IBC International Building Codes. 3. Such enclosed space shall be useable solely fo r parking of vehicles, building access, or storage. Such space shall not be used for human habitation, finished or partitioned into multiple rooms, or temperature-controlled. I. No manufactured homes shall be permitted except in an existing manufactured home park or subdivision. A replacement manufactured home may be placed on a lot in an existing manufactured home park or subdivision provided the anchoring and elevation standards of subsection 13.12-4.020(C). J. Recreational vehicles shall be permitted in coastal high hazard areas provided that they meet the recreational vehicle criteria of subsection 13.12- 4.020(F) and the provisions of subsection 13.12- 4.020(I). Recreational vehicles, park model trailers and campers are prohibited as a principal use on any single lot of record located within the unincorporated portions of Edisto Island. K. Accessory structures, below the required lowest floor elevation specified in subsection 13.12-4.060(B), are prohibited except for the following: 1. Swimming pools. a. They are installed at-grade or elevated at or above the DFE so long as the pool will not act as an obstruction. b. They must be structurally independent of the building and its foundation. c. They may be placed beneath a coastal building only if the top of the pool and any accompanying decking or walkway are flush with the existing grade and only if the lower area remains unenclosed. d. As part of the certification process for V -zone buildings the design professional must consider the effects that any of these elemen ts will have on the building in question and any nearby buildings. 2. Access stairs attached to or beneath an elevated building: a. Must be constructed of flood-resistant material; b. Must be constructed as open staircases so they do not block flow under the structure in accordance with 44 CFR 60.3(e)(5). 3. Decks. a. If the deck is structurally attached to a building then the bottom of the lowest horizontal member must be at or above the elevation of the buildings lowest horizontal member. b. If the deck is to be built below the BFE then it must be structurally independent of the main building and must not cause an obstruction. c. If an at -grade, structurally independent deck is proposed then a design professional must evaluate the design to determine if it will ad versely affect the building and nearby buildings. L. Parking areas should be located on a stable grade under or landward of a structure. Any parking surface shall consist of gravel or aggregate. M. All new and replacement utility equipment and systems, whic h include water supply, sanitary sewage, electrical, and HVAC including ductwork, and other service facilities shall be designed and installed to minimize or eliminate infiltration of floodwaters into these systems or components, or discharges from these s ystems into floodwaters during conditions of the DFE. This requirement does not include the installation of outdoor faucets for shower heads, sinks, hoses, etc., as long as cut off devices and back flow devices are installed to prevent contamination and mi nimize flood damages to the building. No utilities or components shall be attached to breakaway walls. ARTICLE 13.12-5. - VARIANCE PROCEDURES Sections: 13.12-5.010. - Establishment of the zoning board of appeals (ZBA). 13.12-5.020. - Right to appeal. 13.12-5.030. - Historic structures. 13.12-5.040. – Functionally dependent uses. 13.12-5.050. - Agricultural structures. 13.12-5.060. - Considerations. 13.12-5.070. - Findings. 13.12-5.080. - Floodways. 13.12-5.090. – Conditions. 13.12-5.010. - Establishment of the zoning board of appeals (ZBA). The ZBA as established by the Colleton County council shall hear and decide requests for appeals and eligible variances from the requirements of this chapter. 13.12-5.020. - Right to appeal. Any person aggrieved by the decision of the ZBA or any taxpayer may appeal such decision to the county circuit court. 13.12-5.030. - Historic structures. Variances may be issued for the repair or rehabilitation of historic structures upon the determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure. 13.12-5.040. - Functionally dependent uses. Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria in 13.12 -5.050 are met, no reasonable alternative exist, and the development is protected by methods that m inimize flood damage and create no additional threat to public safety. 13.12-5.050. – Agricultural Structures. Variances may be issued to wet floodproof an agricultural structure provided it is used solely for agricultural purposes. In order to minimize flood damages during the base flood and the threat to public health and safety, the structure must meet all of the conditions and considerations of 13.12-5.080., this section, and the following standards: A. Use of the structure must be limited to agricultural purposes as listed below: 1. Pole frame buildings with open or closed sides used exclusively for the storage of farm machinery and equipment, 2. Steel grain bins and steel frame corncribs, 3. General-purpose barns for the temporary feeding of live stock that are open on at least one side; 4. For livestock confinement buildings, poultry houses, dairy operations, and similar livestock operations, variances may not be issued for structures that were substantially damaged. New construction or substantial improvement of such structures must meet the elevation requirements of 13.12- 4.020(B) of this ordinance; and B. The agricultural structure must be built or rebuilt, in the case of an existing building that is substantially damaged, with flood- resistant mate rials for the exterior and interior building components and elements below the base flood elevation. C. The agricultural structure must be adequately anchored to prevent flotation, collapse, or lateral movement. All of the structure's components must be capable of resisting specific flood -related forces including hydrostatic, buoyancy, hydrodynamic, and debris impact forces. Where flood velocities exceed 5 feet per second, fast -flowing floodwaters can exert considerable pressure on the building's enclosure walls or foundation walls. D. The agricultural structure must meet the venting requirement of 13.12- 4.020(D) of this ordinance. E. Any mechanical, electrical, or other utility equipment must be located at or above the DFE, or be contained within a watertight, floodproofed enclosure that is capable of resisting damage during flood conditions in accordance with 13.12- 4.010(E) of this ordinance. F. The agricultural structure must comply with the floodway encroachment provisions of 13.12-4.020(E) of this ordinance. G. Major equipment, machinery, or other contents must be protected. Such protection may include protective watertight floodproofed areas within the building, the use of equipment hoists for readily elevating contents, permanently elevating contents on pedestals or shelves above the base flood elevation, or determining that property owners can safely remove contents without risk to lives and that the contents will be located to a specified site out of the floodplain. 13.12-5.060. - Considerations. In passing upon such applications, the ZBA shall consider all technical evaluations, all relevant factors, all standards specified in other sections of this chapter, and: A. The danger that materials may be swept onto other lands to the injury of others; B. The danger to life and property due to flooding or erosion damage, and the safety of access to the property in times of flood for ordinary and emergency vehicles; C. The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; D. The importance of the services provided by the proposed facility to the community; E. The necessity of the facility to a waterfront location, (functionally dependent) where applicable; F. The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; G. The compatibility of the proposed use with existing and anticipated development, and the relationship of the proposed use to the comprehensive plan and floodplain management program for that area; H. The expected heights, velocity, duration, rate of rise, and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; I. The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and roads and bridges; and J. Agricultural structures must be located in wide, expansive floodplain areas, where no other alternati ve location for the agricultural structure exists. The applicant must demonstrate that the entire farm acreage, consisting of a contiguous parcel of land on which the structure is to be located, must be in the SFHA and no other alternative and viable locations for the structure are available. 13.12-5.070. - Findings. Findings listed above shall be submitted to the ZBA, in writing, and included in the application for a variance. Additionally, comments from the SCDNR, OCRM, SCDHEC, state coordinator's o ffice, and the Army Corps. Of Engineers (USACE), as appropriate, must be taken into account and included in the permit file. 13.12-5.080. - Floodways. Variances shall not be issued within any designated floodway if any increase in flood levels, or ch anges in the floodway configuration during the base flood discharge would result unless a CLOMR is obtained prior to issuance of the variance. In order to insure the project is built in compliance with the CLOMR for which the variance is granted the applicant must provide a bond for 100 percent of the cost to perform the development. 13.12-5.090. - Conditions. Upon consideration of the factors listed above and the purposes of this chapter, the ZBA may attach such conditions to the granting of variance s as it deems necessary to further the purposes of this chapter. The following conditions shall apply to all variances: A. Variances may not be issued when the variance will make the structure in violation of other federal, state, or local laws, regulations, or ordinances. B. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the SFHA or floodway, to afford relief. C. Variances shall only be issued upon a showing of good and sufficient cause, a determination that failure to grant the variance would result in exceptional hardship, and a determination that the granting of a variance will not result in increased flood heights, change in floodway configuration, additional threats to public safety, extraordina ry public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances. D. Any applicant to whom a variance is granted shall be given written notice specifying the difference between the BFE and the elevation to which the structure is to be built and a written statement that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation. Such notification shall be maintained with a recor d of all variance actions. E. The floodplain administrator shall maintain the records of all appeal actions and report any variances to FEMA upon request. F. Variances shall not be issued for unpermitted development or other development that is not in compliance with the provisions of this chapter. Violations must be corrected in accordance with subsection 13.12-3.040(E). ARTICLE 13.12-6. - LEGAL STATUS PROVISIONS Sections: 13.12-6.010. - Effect on rights and liabilities under the existing flood damag e prevention ordinance. 13.12-6.020. - Effect upon outstanding building permits. 13.12-6.030. - Effective Date. 13.12-6.010. - Effect on rights and liabilities under the existing flood damage prevention ordinance. This chapter in part comes forward by re-enactment of some of the provisions of the flood damage prevention ordinance enacted April 7, 1987, as amended October 7, 2008, and it is not the intention to repeal but rather to re -enact and continue to enforce without interruption of such existing p rovisions, so that all rights and liabilities that have accrued thereunder are reserved and may be enforced. The enactment of this chapter shall not affect any action, suit or proceeding instituted or pending. All provisions of the flood damage prevention ordinance of Colleton County enacted on April 7, 1987, as amended October 7, 2008, which are not reenacted herein, are repealed. 13.12-6.020. - Effect upon outstanding building permits. Nothing herein contained shall require any change in the plans, construction, size or designated use of any building, structure or part thereof for which a building permit has been granted by the chief building inspector or his authorized agents before December 2, 2001; provided, however, that when construction is not begun under such outstanding permit within a period of 60 days subsequent to passage of this chapter, construction or use shall be in conformity with the provisions of this chapter. 13.12-6.030. - Effective Date. This chapter shall become effective October 7, 2008. 3. Title 13 – Buildings and Construction, Chapter 13.16 – Manufactured/Mobile Homes, of the Colleton County Code of Laws (the same being inclusive of and one with the Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality to read as follows: CHAPTER 13.16. – MANUFACTURED/MOBILE HOMES Sections: 13.16.020. – Regulation of placement of certain manufactured or mobile homes. 13.16.030. – Wind Zone Requirements. 13.16.040. – Duty of owner to obtain a registration decal. 13.16.050. – Installation. 13.16.060. – Repair, alteration or modification. 13.16.070. – Permits required. 13.16.080. – Prerequisites for power. 13.16.090. – Change of occupancy. 13.16.100. – Temporary use permits. 13.16.110. – Discretion of the director of planning and development and building official. 13.16.120. – Penalty. 13.16.020. - Regulation of placement of certain manufactured or mobile homes. A. For the purposes of this Chapter, home or homes shall mean mobile homes or manufactured homes, and manufactured homes shall mean mobile homes, and vice-versa. B. No mobile homes manufactured prior to June 15, 1976, which are not currently permitted by Colleton County, may be brought into and granted a permit for placement in Colleton County, South Carolina. C. Mobile homes manufactured prior to June 15, 1976, which are, as of the date of the passage of the ordinance codified in this chapter, situated and legally permitted to be located in Colleton County may remain and may be granted a permit for relocation within the county, if structurally sound for relocation. D. Homes that have not been correctly or legally registered; derelict or non - habitable; deemed as no -value by the assessor's office; condemned by code enforcement; or otherwise removed from the tax rolls for any reasons, will be required to meet the guidelines within this chapter before said home can remain in the county. Such homes will require an inspection by the building department before power can be restored. 13.16.030. - Wind zone requirements. A. Federal law defines wind zone 2 as all areas within the boundaries of Colleton County, South Carolina. All manufactured homes are required to be labeled to meet the minimum wind speed for the zone in which they are to be placed. Consequently, only homes built to wind zone 2 or 3 specifications, and labeled as wind zone 2 or 3 units, may be placed in Colleton County. The wind zone requirements are provisions of federal law, and no exceptions or variances are permitted ; therefore, only wind zone 2 or 3 homes will be permitted to move and be placed within Colleton County. B. Wind zone 1 homes currently located and properly registered within the boundaries of Colleton County as of October 3, 2000, may continue to be occupied and used within the boundaries of Colleton County. 13.16.040. - Duty of owner to obtain a registration decal. Each owner of a manufactured home located in Colleton County shall obtain and display a county registration decal as required by state law, within 15 days of purchase, or change of ownership, or if the manufactured home is relocated, except where: A. The unit is temporarily located within the county for the express predetermined purpose of conveyance outside the county within 30 days after arrival; B. The unit is held for display or exhibition purposes by a manufactured home dealer licensed by the state as such; or C. The unit is passing through the county on a public street, road, or highway for conveyance elsewhere. 13.16.050. - Installation. The manufacturer's installation manual is the document to be used for the first placement of new manufactured homes; whereas subsequent installations must utilize the South Carolina Manufactured Housing Board regulations. Such written instructions mu st be available at the job site at the time of the inspection by the county building inspector. A manufactured home installer shall be liable to the purchaser of the manufactured home for failure to properly install/set up the manufactured home pursuant to the requirements of this chapter. 13.16.060. - Repair, alteration, or modification. A. Renovations, repairs, or modifications to manufactured homes are performed under the jurisdiction of the local building authority where the home is located. B. Such work shall be performed in accordance with the requirements of the most recently adopted edition of the International Residential Code (IRC), except where such repairs are performed by a qualified manufacturer's technician during the warranty period. In that case, the repairs shall comply with the Federal Manufactured Housing Construction and Safety Standards. C. A South Carolina manufactured home contractor or repairer, a licensed residential builder, a licensed general contractor, a licensed retail dealer or manufacturer, or an employee thereof for homes sold or manufactured by them, or a registered residential specialty contractor (as long as the Residential Builders' Commission recognizes the specialty), are all permitted to repair, alter, and/or modify manufactured homes. 13.16.070. - Permits required. A. A permit shall be required for the placement of any manufactured home within the unincorporated areas of Colleton County. Only a licensed dealer or installer of manufactured homes, or the unit's owner, if said owner is actually performing the installation, shall apply for the permit. It shall be unlawful for any person selling a manufactured home, or for a manufactured home mover, to deliver or place a unit upon any prospective temporary or permanent sit e without first having secured a manufactured home placement permit. B. No repair, renovation, or alteration to a manufactured home shall commence until a valid permit for such work has been applied for and issued by the planning and development department. C. Where work on a mobile home or its placement on a parcel has occurred prior to obtaining the required permit(s), any and all required permit fees shall be doubled, which may include the zoning permit, the manufactured home permit and/or building permit, as required. The payment of such doubled fee shall not relieve any persons from fully complying with the requirements of this chapter or with any other applicable codes in the execution of the work, nor from any other penalties prescribed. Failure to pay the double permit fees before work recommences shall initiate a citation where a court date will be assigned. 13.16.080. - Prerequisites for power. A. No electric service provider shall install a new connection of electricity to a manufactured home unl ess the director or assigned compliance officer has released permission to the provider. This includes manufactured homes where the power was turned off due to fire or other catastrophe, which requires a permit and inspection of the home prior to authorizi ng the power to be turned back on. B. If the electrical connection has been completed without proper inspections, the director or assigned compliance officer will require the provider to remove such service immediately, and the double permit fees and/or cit ation issuance defined in 13.16.070(C) above shall apply, as appropriate. 13.16.090. - Change of occupancy. A. HUD labeled manufactured homes are constructed as single- family detached residences only. They are not designed or intended for use as, nor will they meet any building code requirements for, offices, stores/shops, class rooms, places of assembly, storage buildings, etc. B. A home-occupation may be conducted from a manufactured home, as long as that use is permitted in the zoning district where the home is located, there are no existing HOA CC&Rs prohibiting it, and such use meets the provisions of any applicable state or federal laws, and the principal use remains as a residence. 13.16.100. - Temporary use permits. The following is the onl y instance for which a temporary permit may be considered for a manufactured home: A. Permitting the temporary set up of a manufactured home for the purpose of remodeling or bringing such unit up to building standards. In this case, no plumbing hookup or electrical permit will be approved. This permit will expire in 90 days. Additional 30- day extensions may be requested from the director, but approval is not guaranteed. B. Nothing in this section exempts an applicant from securing all other required permits. Primary building permits must be applied for at the time the temporary use permit is approved. 13.16.110. - Discretion of the director of planning and development and building official. A. The director has the authority to render interpretations of this chapter and to adopt policies and procedures to clarify the application of its provisions. Such interpretations, policies and procedures shall be in conformance with the intent and purpose of this chapter. B. It shall also be at the discretion of the building official, with approval by the director to request disconnection of power and/or utilities to a manufactured home that has been installed or set up illegally, improperly, or without proper authority, when a home is in violation of this chapter or any othe r applicable state or federal laws; or where necessary due to safety and/or hazardous conditions. 13.16.120. - Penalty. Any person violating or failing to comply with any of the provisions of this chapter shall be deemed guilty of a misdemeanor and upon conviction shall be fined not more than $500.00 or imprisoned for not more than 30 days for each such violation. Each day of noncompliance with the provisions of this chapter shall constitute a separate offense. 4. Title 13 – Buildings and Construction, Chapter 13.20 – Uniform Ordinance Summons, of the Colleton County Code of Laws (the same being inclusive of and one with the Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality to read as follows: CHAPTER 13.20. - UNIFORM ORDINANCE SUMMONS Sections: 13.20.010. - Ordinance summons form. 13.20.020. - Department responsibilities. 13.20.030. - Court and officer copies. 13.20.040. - Record maintenance for annual audit of summons. 13.20.050. - Violation—Penalty. 13.20.060. - Custodial arrest and motor vehicle regulation enforcement excluded. 13.20.010. - Ordinance summons form. There shall be made available to all county compliance officers (which includes code enforcement officers, litter control off icers, building inspectors, zoning administrators, floodplain administrators, sheriff’s deputies, and the fire marshal) of this county an ordinance summons which complies with the requirements of S.C. Code 1976, § 56 -7-80, as amended. The form shall be substantially the same as the form which is attached to the ordinance codified in this chapter and amended herein. The summons shall have the same affect whether served in person or sent by certified mail. 13.20.020. - Department responsibilities. The p lanning and development department shall be responsible for having the summons books printed, issuing blank summons books, and keeping a record of the summons forms assigned to each individual compliance officer or in the case of fire - rescue and sheriff’s deputies, the forms assigned to those departments. 13.20.030. - Court and officer copies. Any compliance officer issuing an ordinance summons shall be responsible for forwarding the copy of the summons labeled "Court Copy" to the appropriate judicia l office within 48 hours of issuing the summons. It shall also be the issuing officer's responsibility to keep the copy of the summons labeled "Officer Copy" until the appointed hearing time. After all action concerning the summons has been concluded, the issuing officer shall provide the "Officer Copy" of the summons to the director or the fire-rescue director (or their designees) within 48 hours. 13.20.040. - Record maintenance for annual audit of summons. Planning and development and fire -rescue shall each be responsible for keeping the summons forms that have been turned in by their respective compliance officers in a manner which will allow for an annual audit of the summons forms. 13.20.050. - Violation—Penalty. A. Any person who fails to appear before the court as required by a uniform ordinance summons, without first having posted such bond, as may be required, or without having been granted a continuance by the court, is guilty of a misdemeanor and, upon conviction, must be fined not more than $500.00 and/or be imprisoned for not less than two days nor more than 30 days. B. Any person, who is issued a summons for violation of the provisions of the Public Nuisance, Building & Construction, Land Development, Zoning, Flood Damage Prevention, and/or Fire Codes as adopted by Colleton County, shall upon conviction of such violation, be guilty of a misdemeanor, and the penalties prescribed by the individual code, chapter, section or by Chapter 1.08, General Penalty, of the Colleton County Code of Laws shall apply. 13.20.060. - Custodial arrest and motor vehicle regulation enforcement excluded. The uniform ordinance summons may not be used to perform a custodial arrest. Further, no county ordinance regulating the use of motor vehicles on the public r oads of the state can be enforced using this uniform ordinance summons. This chapter does not prohibit the county from enforcing ordinances by a ny other means allowed by law. 5. Severability: If any provision of this Ordinance or the application thereof to any person or circumstances is held invalid, the invalidity does not affect other provisions or applications of the Ordinance which can be given effect without the invalid provision or application and to this end, the provisions of this Ordinance are severable. 6. Conflict: Provisions in other County Ordinances, Resolutions, policies, or by -laws in conflict with this Ordinance are hereby repealed. ATTEST: SIGNED: ________________________ __________________________ Kaela Brinson, Council Clerk Steven D. Murdaugh, Chairman ____________________________ COUNCIL VOTE: Approved as to Form OPPOSED: Sean Thornton, County Attorney 1 Sponsor(s) : County Council First Reading : March 1, 2022 I, ____________________, Committee Referral : N/A Council Clerk, certify that this Committee Consideration Date : N/A Ordinance was advertised for Committee Recommendation : N/A Public Hearing on _______. Second Reading : April 5, 2022 Public Hearing : May 3, 2022 Third Reading : May 3, 2022 Effective Date : Immediately ORDINANCE NO. 22-O-05 COUNCIL-ADMINISTRATOR FORM OF GOVERNMENT FOR COLLETON COUNTY [TO AMEND TITLE 14 – LAND MANAGEMENT, CHAPTER 14.04 – LAND DEVELOPMENT REGULATIONS AND CHAPTER 14.08 – ZONING, TO COINCIDE WITH THE TEN YEAR UPDATE OF THE COLLETON COUNTY COMPREHENSIVE PLAN.] WHEREAS: 1. Title 14 – Land Management, Chapter 14.04 – Land Development Regulations , of the Colleton County Code of Ordinances were reviewed by the Planning Commission o n November 23, 2020, December 29, 2020 and March 28, 2022; and 2. Title 14 – Land Management, Chapter 14.08 – Zoning, of the Colleton County Code of Ordinances were reviewed by the Planning Commission on December 29, 2020, January 25, 2021 and March 28, 2022; and 3. Chapters 14.04 and 14.08 were edited for legal sufficiency, redundancy and/or unnecessary words and phrases, and updated and clarified simplified phrases in order to be current with the accepted American Planning Association (APA) principles and practices; and 4. County Council believes it is in the best interest of the citizens of Colleton County to approve the changes set forth herein. NOW, THEREFORE, BE IT ORDAINED BY COLLETON COUNTY COUNCIL, DULY ASSEMBLED, THAT: 1. Title 14 – Land Management, Chapter 14.04 – Land Development Regulations , of the Colleton County Code of Laws (the same being inclusive of and one with the Originating and Amending Ordinances), and all subparagraphs thereof, is hereby amended in its totality to read as follows: CHAPTER 14.04. - LAND DEVELOPMENT REGULATIONS ARTICLE 14.04-1. - PURPOSE AND AUTHORITY 2 Sections: 14.04-1.010. - Title. 14.04-1.020. - Purpose and authority. 14.04-1.030. - Jurisdiction. 14.04-1.010. - Title. This chapter shall be known and may be c ited as the Land Development Regulations of Colleton County, South Carolina. 14.04-1.020. - Purpose and authority. The purpose of these land development regulations is to promote the public health, safety, and welfare of the residents and require the harmonious, orderly, controlled and sustainable development of land within the county. In furtherance of this general intent, the regulation of land development by the county is authorized by S.C. Code 1976, § 6- 29-1120 for the following purposes, among others: A. To encourage the development of economically sound and sustainable municipalities and counties; B. To assure the timely provision of required streets, utilities, and other facilities and services to new land developments; C. To assure the adequate provision of safe and convenient traffic access and circulation, for motorists, bicyclists and pedestrians, in and through new land developments; D. To assure the provision of needed public open spaces and building sites in new land developments through the dedication or reservation of land for recreational, educational, transportation, and other public purposes; and E. To assure, in general, wise, timely and sustainable development of new areas, and redevelopment of previously developed areas in harmony with the comprehensive plans of municipalities and counties. 14.04-1.030. - Jurisdiction. The regulations contained herein shall govern each and every subdivision and installation of infrastructure within the county outside of the jurisdiction of any incorporated municipality, except those we have an intergovernmental agreement with to do their planning, zoning, building permitting and inspections. ARTICLE 14.04-2. - LEGAL PROVISIONS Sections: 14.04-2.010. - Administration. 3 14.04-2.020. - General legal provisions. 14.04-2.030. - Existing and future ordinances. 14.04-2.040. - Severability and validity. 14.04-2.050. - Violations and penalties. 14.04-2.060. - Appeals. 14.04-2.070. - Modifications. 14.04-2.080. - Amendments. 14.04-2.090. – Delegated authority to staff. 14.04-2.100. - Abrogation. 14.04-2.110. – Repeal of conflicting ordinances. 14.04-2.120. – Effective date of adoption. 14.04-2.010. - Administration. In accordance with S.C. Code 1976, § 6- 29-1150(C), the planning commission is responsible for the administration of the land development regulations. The planning commission hereby designates the director of planning and development hereinafter (director) or his designee to perform the duties as set forth herein. 14.04-2.020. - General legal provisions. A. No subdivision plat, survey, or other land development plan within the jurisdiction of the county may be filed or recorded in the county office where deeds are recorded until it bears the stamp of approval and is properly signed by the director. B. No building permit may be issued until the plat or site plan is approved and properly signed by the authority designated in this chapter. C. If the developer defaults in installing required site improvements, the County can use the proceeds of the required surety bond or other security instrument posted by the developer to install the required improvements. 14.04-2.030. - Existing and future ordinances. All proposed development of land must comply in all respects with the requirements of chapter 14.08, pertaining to zoning, chapter 13.12, pertaining to floodplain damage prevention, and, where applicable, any other officially adopted ordinances, plans or maps approved by the county. 14.04-2.040. - Severability and validity. Should any section or provision of this chapter be decided by a court of competent jurisdiction to be unconstitutional or invalid, such decision shall not affect the validity of the chapter as a whole or any part thereof other than the part so declared to be unconstitutional or invalid. 14.04-2.050. - Violations and penalties. A. Complaints regarding violations. Whenever an alleged violation of this chapter occurs, the director or his designee shall investigate such complaint, and take such action as provided by this chapter. Complaints may be filed in writing or verbally, stating fully the cause and basis thereof. 4 B. Penalties for violations. 1. Except as otherwise provided herein, the owner or agent of the owner of any land to be subdivided within the unincorporated po rtion of the county who transfers or sells the land by reference to or exhibition of or by other use of a plat of subdivision of the land before the plat has been approved by the director and/or the planning commission and recorded in the office of the reg ister of deeds in and for the county, shall be guilty of a misdemeanor and, upon conviction thereof, shall be punished in the discretion of the court; and the description by metes and bounds in the instrument of transfer or other document used in the proce ss of selling or transfer shall not exempt the transaction from these penalties. The county may enjoin the transfer or sale or agreement by appropriate action. 2. Where any building, structure, or sign is or is proposed to be erected, constructed, reconstructed, altered, converted, demolished, maintained, or be used in violation of this chapter, the director or his designated compliance officers may, in accordance with the provisions of S.C. Code 1976, § 56-7-80, as amended, issue a stop-work-order, an ordina nce summons, or institute injunction, mandamus, or other appropriate action or proceeding to prevent such unlawful erection, construction, reconstruction, alteration, conversion, demolition, maintenance, or use; to correct or abate the violation or to prevent the occupancy of the building, structure, or land. Each day such unlawful erection, construction, reconstruction, alteration, conversion, demolition, maintenance, or use continues shall be deemed a separate offense. 3. Failure to apply for the appropriat e and required permits, including building, zoning, sign and/or floodplain permits, prior to commencing any work requiring a permit shall require the director or his designated compliance officers to issue a stop -work-order. The stop- work-order cannot be removed to allow further work to commence until the applicant has submitted everything required for each re quired permit, received approval on all permits, and paid a double - permit fee fine for all permits required. Failure of the applican t to comply and/or pay the double -permit fee fine may cause the property owner to be fined up to $500.00 and serve up to 30 days in jail in accordance with Colleton County Codes, where each day’s violation of any provision of this chapter shall constitute a separate offense. 14.04-2.060. - Appeals. A. Questions arising from the enforcement of these regulations by the director or his designated compliance officers may be appealed to the planning commission for consideration within 30 days of the decision. T he planning commission will render a decision on the appeal within 60 days and the appellant will be notified, in writing, of such decision within seven business days. 5 B. Any party aggrieved by a decision of the planning commission regarding the standards enumerated in these regulations or a ruling on a requested modification may appeal the decision to the circuit court of the county. The aggrieved party shall file a petition with the clerk of court within 30 days of the planning commission decision. 14.04-2.070. - Modifications. A. The planning commission may grant, upon written request, design modifications to the requirements of article 14.04-5 if the strict application of the requirements would create an undue hardship in the development of land. S uch hardship cannot be created by the applicant or be requested for the sole purpose of increasing profitable gain. Design modification requests shall be prepared by the property owner, developer, or agent and address the criteria in subsection C of this section. B. Requests for design modifications shall be submitted at the same time the plat is submitted. C. Before granting the design modification, the planning commission shall state, for the record, that the following findings are satisfied. In reaching such conclusion, the commission may utilize the written request prepared by the applicant or other applicable information. 1. The design modification is justified due to topographical or other special conditions unique to the property. 2. The design modification will not compromise the intent or purpose of the regulations. 14.04-2.080. - Amendments. A. The planning commission is responsible for the review and recommendation of amendments to the land development regulations to the county council for adoption. B. The county council may adopt amendments to this chapter by enacting an ordinance following a duly noticed public hearing. C. A public hearing for an amendment to this chapter shall have a minimum of 30 days' notice by publication in a newspaper of general circulation including the time and place of the hearing in accordance with S.C. Code 1976, § 6-29-1130(B). 14.04-2.090. - Delegated authority to staff. Pursuant to S.C. Code 1976, § 6- 29-1150, the planning commission delegates review and approval authority to the director of planning and development, hereinafter (director) or his designee for all exempt plats, minor and major subdivisions, summary plats, boundary surveys, final plats and commercial development projects. Only major subdivision preliminary plats require the approval of the planning commission. 14.04-2.100. - Abrogation. 6 It is not intended that this chapter repeal, abrogate, annul, impair, or interfere with any existing easements, covenants, deed restrictions, agreemen ts, rules, regulations, or permits previously adopted or issued pursuant to law. However, where this chapter imposes greater restrictions, the provisions of this chapter shall govern. 14.04-2.110. - Repeal of conflicting ordinances. All ordinances and parts of ordinances in conflict with this chapter are repealed to the extent necessary to give this chapter full force and effect. 14.04-2.120. - Effective date and adoption. The ordinance from which this chapter is derived shall take effect and be in force from and after May 3, 2022. ARTICLE 14.04-3. - SUBDIVISION TYPES AND REVIEW PROCEDURES Sections: 14.04-3.010. - Purpose. 14.04-3.020. - Land development types. 14.04-3.030. - Minor subdivision process. 14.04-3.040. - Major subdivision process. 14.04-3.050. - Financial guarantees. 14.04-3.060. - Commercial development projects. 14.04-3.010. - Purpose. The purpose of this article is to establish an orderly subdivision process for the county. It is also the intent of this article to provid e a clear and comprehensive approval process that is fair and equitable to all interests including the petitioners, affected neighbors, county staff, and related agencies. Approved plans shall be the guiding documents for final approval and permitting. 14.04-3.020. - Land development types. A. Commercial development defined. Commercial development is any development other than a single or two family residential development on a single lot, not used for commercial gain, which excludes units for rent or le ase or any owner/renter characteristics. Commercial developments include: residential or commercial subdivisions; multi-family apartment or condominium complexes; commercial retail or service businesses, offices, parks, or centers; industrial developments or parks; or, mobile home and RV parks or subdivisions. B. Subdivision defined. According to S.C. Code 1976, § 6- 29-1110(2), a subdivision is a division of a tract or parcel of land into two or more lots, building sites or other divisions for the purpose , whether immediate or future, of sale, lease, or building development. It includes all division of land involving a new street or change in existing streets. It covers the alteration of streets or establishment of new streets within a subdivision previous ly approved or recorded. Subdivision also includes re - 7 subdivision involving further division or relocation of lot lines of any lot or lots within a subdivision previously made and approved or recorded, and combinations of lots of record. C. Subdivision t ypes. For all subdivisions of land, the following categories of subdivisions shall be used to determine the procedures required for review: 1. Exempt subdivision. a. Exempt subdivisions are exempt from the design standards of this chapter; however, all lots are subject to the minimum requirements of chapter 14.08. An exempt subdivision: i. Involves the division of land into parcels of five acres or more where no new public or private street is involved; ii. Includes the combination or recombination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards of this chapter and other applicable regulations; iii. Includes plats for the creation of cemetery lots; or iv. Includes a plat of a single pre-existing lot of record. b. The director shall, when an exempt plat is submitted for recording, review said plat to determine if it is in fact exempt from the requirements of this chapter. An exempt subdivision shall be drawn to mee t the Minimum Standards Manual for the Practice of Land Surveying in South Carolina. c. If the plat is found not to be exempt from the requirements of this chapter, the applicant shall be instructed to submit the plat to the director for approval and processing. 2. Minor subdivision. a. A minor subdivision is one which does not involve: i. The creation of more than 15 lots fronting onto an approved, existing public or private road or street right-of-way; or ii. The creation of any new public or private street. b. The minor subdivision process shall not be used twice within three years anywhere within the original property boundaries if the total number of lots exceeds 15 or a new public or private street is created, which then requires the major subdivision process to be used. 3. Major subdivision. A major subdivision is any subdivision other than an exempt or minor subdivision. 4. Planned development district (PDD) subdivision. a. A PDD subdivision is a major subdivision located within a PDD zoning classification as regulated in section 14.08- 2.140. It is intended to allow for 8 flexibility to improve the design, character, and quality of new mixed use developments and preserve natural and scenic features of open spaces. b. Design standards set out in this chapter may be waived or modified for PDDs provided the intent of this chapter is not nullified or lessened and sufficient proof is given substantiating the adequacy of the alternative design. 5. Conservation development subdivision. A conser vation development subdivision is a type of residential subdivision that allows smaller than minimum lot sizes and setbacks with dwelling units clustered in smaller areas to preserve larger areas for open space and environmental resources developed in accordance with section 14.08-3.020(H). 14.04-3.030. - Minor subdivision process. The following chart illustrates the Minor Subdivision process: A. Step 1: Pre-application meeting and sketch plan (recommended). 9 1. To secure advice in the formative stages of development, expedite applications, and reduce development costs, the developer may request a pre- application meeting and/or sketch plan review. 2. If requested, the director shall schedule a pre -application meeting to discuss all applicable subdivision development requirements and provisions of the comprehensive plan, land development options, what is require d of the applicant, and any other pertinent information. The director may invite or consult with other department heads and/or affected agencies. 3. In addition or as an alternative to the pre -application meeting, the applicant may request an informal review of a sketch plan for the proposed subdivision. B. Step 2: Applicant submits final plat. Applicants shall submit to the director four copies and a digital PDF version of the final plat drawn to the requirements of the Minimum Standards Manual for the Practice of Land Surveying in South Carolina, the final plat requirements of article 14.04-4 of this chapter, and the required fee. C. Step 3: Director review of final plat. The director shall review the plat for compliance with this chapter, chapter 14.08, any other applicable regulations, and if found to be in compliance, will instruct the applicant to prepare a final plat for recording, including surveyor certification. D. Step 4: Review and recommendation by other applicable agencies. The director may at his discretion require public agencies concerned with the new development to review and make recommendations on the plat; however, the county issued building permit does not waive any other outside agency permitting requirements. All recommendations should be forwarded to the director within 30 days from date of receipt. Said public agencies may include, but not be limited to, the following: 1. South Carolina Department of Transportation (SCDOT), Department of Health and Environmental Control (SCDHE C), or Department of Natural Resources (SCDNR). 2. County Fire Marshal, County Engineer, or Department of Roads and Bridges. 3. U.S. Army Corps of Engineers or Office of Coastal Resource Management (OCRM). 4. City of Walterboro utilities or other City Departments. 5. Any other agency or official designated by the director. E. Step 5: Applicant revision period. The applicant shall revise the plat in accordance with the director's review. All necessary revisions shall be made prior to approval. F. Step 6: Director approves final plat. 10 1. Following successful revision of the final plat by the applicant, the director shall approve the final plat by obtaining the applicable signatures as required by section 14.04-4.030. 2. Final plat approval shall confer upon the applicant the following rights: a. To record the plat with the register of deeds within six months of final plat approval; and b. To proceed with the sale and/or transfer of lots and parcels. 3. If the final plat is not recorded within six months, it shall become void. 14.04-3.040. - Major subdivision process. The following chart illustrates the Major Subdivision process: 11 A. Step 1: Pre-application meeting and sketch plan (recommended). 1. To secure advice in the formative stages of development, expede applications, and reduce development costs, the developer may request a pre- application meeting and/or sketch plan review. 2. If requested, the director shall schedule a pre -application meeting to discuss all applicable subdivision development requirements and provisions of the comprehensive plan, land development options, what is required of the applicant, and any other pertinent information. The director may invite or consult with other department heads and/or affected agencies. 3. In addition or as an alternative to the pre -application meeting, the applicant may request an informal review of a sketch plan for the proposed subdivision. B. Step 2: Applicant submits preliminary plat and supporting documentation. Applicants shall submit to the director 12 copies and a digital PDF version of the preliminary plat, two copies and a digital PDF version of the construction plans, the required fee, and all materials stipulated by section 14.04-4.030. C. Step 3: Director review of preliminary plat. The director shall review the plat for compliance with the requirements of this chapter, chapter 14.08, and an y other applicable regulations. D. Step 4: Review and recommendation by other applicable agencies. The director may at his discretion require public agencies concerned with the new development to review and make recommendations on the plat; however, the county issued building permit does not waive any other outside agency permitting requirements. All recommendations should be forwarded to the director within 30 days from date of receipt. Said public agencies may include, but not be limited to, the following: 1. South Carolina Department of Transportation (SCDOT), Department of Health and Environmental Control (SCDHEC), or Department of Natural Resources (SCDNR). 2. County Fire Marshal, County Engineer, or Department of Roads and Bridges. 3. U.S. Army Corps of Engineers or Office of Coastal Resource Management (OCRM). 4. City of Walterboro utilities or other City Departments. 5. Any other agency or official designated by the director. E. Step 5: Applicant revision period. The applicant shall revis e the plat in accordance with the director's review. F. Step 6: Review and approval of preliminary plat by planning commission. 12 1. Upon completion of the revised plat, the director shall forward the preliminary plat and all staff and agency recommendations to the planning commission. 2. The planning commission shall act on the application at their next regularly scheduled monthly meeting. In its deliberation, the planning commission may approve, approve conditionally, require resubmittal, or deny approval. 3. If the preliminary plat is disapproved or approved conditionally, all reasons shall be conveyed to the applicant, referring specifically to those parts of the comprehensive plan or ordinances to which the plat does not conform. The commission may also require the applicant to resubmit the preliminary plat with all recommended changes made, before approving said plat. 4. If the preliminary plat is found to conform to all requirements of the county comprehensive plan and applicable subdivision codes, approval shall be granted by the planning commission. One copy shall be retained by the planning office and one copy provided to the applicant. 5. Preliminary plat approval shall confer upon the applicant the following rights for one year from the da te of approval, unless extended by the planning commission: a. To proceed under the supervision of the county, with the installation of site improvements; and b. Upon installation or guarantee in accordance with section 14.04- 3.050, to proceed with the preparation of a final or bonded final plat. 6. Preliminary plat approval shall not authorize the applicant to sell or otherwise transfer lots or parcels. G. Step 7: Applicant submits final or bonded final plat. 1. Final plat approval is an administrative action and does not require planning commission action. No public notice or hearing is required for approval of the final plat. 2. Applicants shall submit to the director four copies and a digital PDF version of the final plat drawn to the requirements of the Minimum Standards Manual for the Practice of Land Surveying in South Carolina, the final plat requirements of article 14.04-4, and the required fee. 3. The final or bonded final plat shall show all streets and utilities in exact location, identifying those portions already installed and, where approved by the planning commission, those to be installed and/or certified in the amount of improvement guarantees required to assure completion of those improvements not yet installed in accordance with section 14.04-3.050. 13 H. Step 8: Director review of final plat. The director shall review the plat for compliance with the requirements of the approved preliminary plat, this chapter, chapter 14.08, and any other applicable regulations, and if found to be in compliance, will instruct the applicant to prepare a final plat for recording, including surveyor certification. I. Step 9: Applicant revision period. The applicant shall revise the plat in accordance with the director's review. All necessary revisions shall be made prior to approval. J. Step 10: Director approves final plat. 1. Following successful revision of the final plat by the applicant, the director shall approve the final plat by obtaining the applicable signatures as required by section 14.04-4.030. 2. Final plat approval shall be granted or denied within 45 days after submission of a complete application to the director or within such further time as consented to by the applicant. 3. No subdivision or land development plat, portion, or phase there of shall be accepted for filing by the register of deeds until it has been approved by the director, and so indicated on the plat by the signature of the authorized agent. No such signature shall be affixed to the plat until the developer has completed all required improvements or has posted a letter of credit and agreement in accordance with section 14.04-3.050. 4. Final plat approval shall confer upon the applicant the following rights: a. To record the plat with the register of deeds within six months of final plat approval; and b. To proceed with the sale and/or transfer of lots and parcels. 5. If the final plat is not recorded within six months, then it shall become void. 14.04-3.050. - Financial guarantees. A. General. 1. Financial guarantees may be posted in lieu of completing improvements required by these regulations to the bonding of a subdivision project prior to bonded final plat approval and shall authorize the sale, conveyance, or transfer of lots within the subdivision, in addition to the use of the lots as legal building sites. 2. Acceptance of financial guarantees is discretionary and the county reserves the right to refuse a financial guarantee for any remaining improvements and require that such improvements be completed before the recording of a bonded final plat or issuance of building permits. Acceptance of a financial guarantee by the county 14 shall not to be construed as an obligation to any other agency, utility or property owner within affected developments. B. Submittal. 1. A cost estimate prepared by a licensed engineer for financial guarantees shall be submitted to the director and follow the procedures enumerated below. Failure to follow these procedures may delay the approval of such guarantee and recording of a bonded final plat or issuance of building permits. 2. An itemized cost estimate shall be submitted for the improvements that the financial guarantee will cover. Such estimate shall bear the original signature of the estimator, be on company letterhead, an d be in a form acceptable to the director. Cost estimates may include, but are not limited to, the following: a. Water and sewer systems. b. Storm drainage systems and erosion control measures. c. Street improvements including curbs, gutters, sidewalks, pavements, temporary cul-de-sac turn-arounds, and required grassing or landscaping within rights -of- way or easements. d. State road right-of-way improvements upon agreement between the county and the state department of transportation. e. Street monuments. f. Street intersection lighting. 3. The director will determine if the proposed cost estimate is consistent with the prevailing costs for construction materials and determine if the cost estimate is acceptable as a financial guarantee for the p roposed amount, and if so determined, it may be submitted. C. Acceptance of financial guarantees. 1. The director and county finance department may accept a letter of credit as a financial guarantee to ensure the completion of public improvements in acc ordance with the requirements enumerated below. 2. Approved guarantees shall be independent of the development project's construction loan. The director will not accept any guarantee that requires draw - downs for monthly expenditures. Payment of monthly e xpenditures is the sole responsibility of the developer and does not affect the amount of money held by the county. 3. Approved letters of credit shall adhere to the following standards. See article 14.04- 7 for an example letter of credit. 15 a. Be equal to 125 percent of the approved cost estimate. b. Be issued for an initial coverage period not less than 12 months from the date that the final plat is submitted for recording. c. Be irrevocable, unconditional and subject to presentation for drawing within the state. Upon consent of the issuing institution and the county finance department, facsimile drawing may be permitted. In no instance shall a letter of credit only include a facsimile number for the purpose of potential drawing. d. Be payable to Colleton County. e. The original letter of credit shall be submitted. All originals are the property of the county with all signatures in blue ink. 4. Renewals for letters of credit may be made upon approval of the planning commission. Once approved, all renewals must be presented and accepted by the director and finance department no later than 30 days prior to expiration. Failure to adhere to this deadline will require the immediate draw on the original letter of credit. 14.04-3.060. - Commercial development projects. A. Commercial development site plan required. No building permit shall be issued for a commercial development unless and until an applicant for such use submits to the director the following: 1. A site plan with date and scale, showing the actual shape and dimensions of the lot to be built upon; the size, height, and location on the lot of existing and proposed buildings and structures; the intended use of each building, the number or units the building is designed to accommodate; lands caped areas; flood and wetland areas; all proposed on -site signage showing locations; proposed parking, driveways, and interior circulation pattern; building elevations; and contiguous off-site development. 2. Stormwater plan. 3. Tree survey. 4. Copies of permits required and obtained from other state and local agencies, where requested. B. Commercial development site plan submittal requirements. 1. Three full-size paper copies (additional prints shall be provided when deemed necessary). 2. Digital copy in PDF format. 16 C. Project design criteria. 1. The director shall evaluate the application in relation to the following design and improvement criteria: a. The commercial development project is consistent and compatible with the comprehensive plan. b. All of the requirements of chapter 14.08 and other applicable regulations are met. c. Ingress and egress to the project site shall be designed to maximize automotive and pedestrian safety and facilitate traffic flow. d. Off-street parking, off-street loading, refuse, signage, and service areas shall be designed to minimize their visual and physical impact on neighboring property. e. Street right-of-way, sidewalks and pavement construction shall be adequate to accommodate the type and volume of traffic anticipated. f. The project shall be designed in harmony with its physical surroundings and in such a manner as to ensure land use compatibility. g. Where the project will create a need for off -site improvements, including improvements to str eets, drainage systems, sidewalks, and curbs, the director may require the installation of such improvements as a condition of approval. h. If, upon review of these standards, the project is determined to be in compliance, the director shall approve the land development application and cause the issuance of a building permit. 2. Any proposed changes to an approved project shall be resubmitted and reevaluated in light of the above. ARTICLE 14.04-4. - SUBDIVISION PLAN REQUIREMENTS Sections: 14.04-4.010. - Purpose. 14.04-4.020. - Sketch plan submittal requirements. 14.04-4.030. - Plat submittal requirements. 14.04-4.040. - Construction drawing requirements. 14.04-4.010. - Purpose. The purpose of this article is to establish the requirements fo r plat and plan submittal for subdivisions in accordance with the processes set forth in article 14.04- 3. 17 14.04-4.020. - Sketch plan submittal requirements. A. Sketch plan submittal requirements. If the applicant chooses to submit a sketch plan for review, then three copies and a digital PDF version of the sketch plan shall be provided. B. Plan labeling . A sketch plan shall be scaled and show the approximate proposed layout of streets, lots, buildings, landscaping, signage, open spaces, and other features in relation to existing conditions (the director may waive any information required by this section). It shall also include the following information: 1. Name of the proposed development. 2. North arrow. 3. A vicinity map including north arrow. 4. Boundaries of the tract and the portion of the tract to be subdivided. 5. Parcel number(s) of the lot(s) to be subdivided. 6. Adjacent property owners and tax map numbers. 7. Zoning classification of the tract and of adjacent properties. 8. Total acreage to be subdivided. 9. Estimated and proposed uses of the land within the subdivision and the existing uses of land adjoining it. 10. Existing and proposed road layout with approximate pavement and right -of-way width, lot layout and size of lots. 11. Name, address, email address, and telephone number of the owner. 12. Roads and lots of adjacent developed or platted properties. 13. Existing topographic conditions of the property. 14. Watercourses, floodplains, and preserved areas. 14.04-4.030. - Plat submittal requirements. A. Preliminary plat submittal requirements for major subdivisions only. 1. Twelve full-size paper copies (additional prints shall be provided when deemed necessary) 18 2. Digital copy in PDF format. B. Major and minor final plat submittal requirements. 1. Four full size paper copies for review. 2. Digital copy in PDF format. C. Plat labeling requirements for preliminary and final plats. 1. Labeling matrix. The preliminary and (bonded) final plats shall dep ict or contain the information indicated in the following matrix. An X indicates that the information is required. Preliminary plat information is only required for major subdivisions. Exempt subdivisions and subdivision of one lot into two lots are only r equired to meet Minimum Standards Manual for the Practice of Land Surveying in South Carolina. Title Block Information: Preliminary Plat Final Plat a) Subdivision name x x b) Name of owner x x c) Name of the subdivider/developer x x d) Tax map number(s) x x e) Location (including township, county and state) x x f) Bar graph scale and north arrow x x g) Deed reference x x Plat Preparation Information: Preliminary Plat Final Plat a) All information required of general property surveys, in accordance with the Minimum Standards Manual for the Practice of Land Surveying in South Carolina, as promulgated by S.C. Code 19 76, title 40, chapter 21. x x b) Names and addresses of all owners, mortgagees, registered land surveyors, land planners, architects, landscape architects, utility planners, and professional engineers responsible for the subdivision. x x Property and Site Calculation Information: Preliminary Plat Final Plat a) Vicinity map with north arrow showing the relationship between the proposed subdivision and surrounding area x x b) Corporate limits, extraterritorial jurisdiction and county lin es if on x x 19 the subdivision tract c) Boundaries of the tract or portion thereof to be subdivided, distinctly and accurately represented with all bearings and distances shown x d) Exact boundary lines of the tract to be subdivided, fully dimensioned by lengths and bearings, and the location of existing boundary lines of adjoining lands x e) Adjoining property information including owner name, zoning classification, and subdivision name x x f) Minimum building setback lines x x g) Zoning classifications of the tract(s) to be subdivided x x h) Total acreage in the tract to be subdivided x x i) Acreage in parks and recreation and open space areas and other nonresidential uses x x j) Total number of parcels created x x k) Acreage in the smallest lot in the subdivision x x l) Linear feet in roads x x m) Existing structures, watercourses, railroads, bridges, culverts, storm drains x x n) Proposed lot lines, lot and block numbers, and approximate dimensions x x o) The lots numbered consecutively throughout the subdivision in a manner using only numeric symbols x x p) Marshes, swamps, rock outcrops, ponds or lakes, streams or stream beds and any other natural features affecting the site x q) The location of all special flood hazard areas, floodways and floodway fringe areas from the county's official flood maps, and community panel number if applicable x x Streets, Infrastructure, and Open Space Information: Preliminary Plat Final Plat a) Right-of-way location and dimensions x x b) Road surface width x c) Road profiles x d) Existing and platted roads on adjoining properties and in the proposed subdivision x x e) Approved E911 Road names (Sheriff's Office) x x 20 f) Type of road dedication; all roads must be designated either "public" or "private". x x g) Utility plan showing proposed connections x h) Drainage, access -way, and utility easement locations and dimensions x x i) Fire hydrants, if applicable x j) Drainage plan and calculations (See section 14.04-5.070(L)) x x k) Buffer strips (where applicable) x x l) Pedestrian or bicycle paths (where applicable) x m) Open space areas (where applicable) x x n) Areas to be used for purposes other than residential with the purpose of each stated with dimensions. x x Agency Approvals: Preliminary Plat Final Plat a) SCDOT approval of driveway permits and road construction drawings (where applicable) x b) DHEC-Health (sep tic or engineered system approval) (Subdivisions of eight lots or less are exempt) x x c) SCDHEC/OCRM Stormwater approval (see section 14.04 - 5.070(L)) x d) US Army Corps of Engineers approval for wetlands x e) City of Walterboro or other applicable utilities x f) All certifications required below x x 2. Certificates and statements for preliminary plats. a. Certificate of survey and accuracy. As required by the Minimum Standards Manual for the Practice of Land Surveying in South Carolina. b. Certificate of approval for major subdivision preliminary plats only. I hereby certify that the preliminary plat for the major subdivision shown hereon has been found to comply with the Land Development Regulations of Colleton County, South Ca rolina, and that this plat was approved by the planning commission on ____________ / ____________ / ____________. _____ _____ Date Director of Planning and Development 3. Certificates and statements for final plats. 21 a. Certificate of ownership and dedication. I (We) hereby certify that I am (we are) the owner(s) of the property shown and described hereon and that I (we) hereby adopt this plat of subdivision with my (our) free consent, establish the minimum building lines, and dedicate all streets, s chool sites, recreation areas, and other public services and facilities as noted on this plat. _____ _____ Date Owner b. Certificate of survey and accuracy. As required by the Minimum Standards Manual for the Practice of Land Surveying in South Carolina. c. Certificate of approval stamp by the director of planning and development. 14.04-4.040. - Construction drawing requirements. A. Construction drawing submittal requirements. 1. Construction drawings for major subdivisions and commercial deve lopments larger than two acres shall be submitted after the existing conditions survey (section 14.04-5.030) is approved by the director. 2. Two full sets and a digital PDF version of sealed construction drawings shall be submitted with the major subdivis ion preliminary plat, or the final plat for all other subdivisions. 3. Construction drawings shall be prepared for all required improvements by a registered South Carolina engineer at a convenient scale of not less than one inch equals 100 feet. B. Construction drawing labeling requirements. Construction drawings shall include the following information: 1. Profiles showing existing and proposed elevations along the center lines of all new roads. The elevation along the center line of existing roads sha ll be shown within 100 feet of their intersection with new roads. Radii of all curves, lengths of tangents, and central angles on all streets shall also be shown; 2. Plans and profiles showing the locations and typical cross section of street pavements, including curbs and gutters, sidewalks, drainage easements, rights - of-way, manholes, and catch basins; the locations of street trees, street lighting standards, and street signs; the location, size, and invert elevations of existing and proposed sanitary s ewers, stormwater drains, and fire hydrants, showing connection to any existing or proposed utility systems; and exact location and size of all water, gas, or other underground utilities or structures; 3. Location, size, elevation, and other appropriate description of any existing facilities or utilities, including, but not limited to, existing streets, sewers, drains, 22 water mains, easements, water bodies, streams, and other pertinent features such as swamps, railroads, buildings, at the point of connecti on to proposed facilities and utilities within the subdivisions. The water elevations of adjoining lakes or streams at the date of the survey, and the approximate 100 -year flood elevations of the lakes or streams. All public water and/or public sewers are to be installed; 4. The acreage of each drainage area affecting the proposed subdivision; 5. Topography at a contour interval of two feet, referred to sea level datum when public water and/or public sewers are to be installed; 6. All specifications a nd references required by the construction standards and specifications of the county, any other local government providing any utility, and the SCDHEC and the SCDOT; 7. A site grading plan showing proposed finished contours when any major contour changes or filling for flood protection are proposed in the subdivision; and 8. Title, name, address, telephone, and signature of South Carolina licensed professional engineer and/or surveyor responsible for the plans and date, including revision dates. ARTICLE 14.04-5. - SUBDIVISION DESIGN STANDARDS Sections: 14.04-5.010. - Purpose. 14.04-5.020. - General provisions. 14.04-5.030. - Environmental assessment and suitability of land. 14.04-5.040. - Lots. 14.04-5.050. - Open space requirements. 14.04-5.060. - Easements. 14.04-5.070. - Road standards. 14.04-5.080. - Utilities standards. 14.04-5.090. - Emergency management. 14.04-5.100. - Surveying and markers. 14.04-5.110. - Construction procedures. 14.04-5.010. - Purpose. The purpose of this art icle is to establish the requirements for subdivision lot configuration, lot access, roadway layout, easements, and utilities to ensure sustainable and adequate subdivision design. 14.04-5.020. - General provisions. 23 A. Each subdivision shall contain the improvements specified in this article, which shall be installed in accordance with the requirements of this chapter and paid for by the developer, unless other means of financing are specifically approved. B. Land shall be dedicated and reserved in each subdivision as specified in this article. C. Each subdivision shall be constructed in accordance with any county, state and federal regulation or permitting requirement where applicable. D. The name of the subdivision and the names of the roads within the subdivision shall not duplicate nor closely approximate the name of an existing subdivision, nor any existing roads within the county. E. Design standards set out in this chapter may be waived or modified for PDDs provided that the intent of these regulations is not nullified or lessened and provided that sufficient proof is given substantiating the adequacy of the alternative design and given that the requirements of PDDs within chapter 14.08 are met. 14.04-5.030. - Environmental assessment and suitability of land. A. Preservation of trees and natural features for commercial developments and major subdivisions. 1. Significant forest stands, specimen/protected trees, severe topography, drainage features and watercourses shall be preserved where reasonable and practical while not reasonably prohibiting development. 2. Forested and vegetated areas whose settings render them unsuitable for development should be used as conservation or open space areas. When portions of wooded sites and forested s tands must be developed, consideration should be given to preserve wooded perimeters and/or the most desirable features to retain the aesthetic character of the site. Isolated pockets of existing trees or specimen/protected trees shall be protected whenever possible. C. Existing conditions survey. Existing conditions surveys are required at the preliminary plat stage for major subdivisions and commercial developments larger than two acres prior to submittal of the site construction plans. Existing trees, known endangered species, wetlands, streams, creeks, floodplains, dams, potential locations for community wells, and topographical features shall be identified prior to the construction site plans to enable the preservation of distinctive natural features and protection for previously documented endangered species habitats. 24 FIG. 5.1 EXAMPLE OF AN EXISTING CONDITIONS SURVEY* *Figures 5.1 and 5.2 Source: Southeastern Wisconsin Regional Planning Commission (SEWRPC). "Conservation Subdivision Design." 2002. C. Flood damage prevention. 1. For areas located within a special flood hazard area (SFHA) or floodway, the requirements of chapter 13.12, pertaining to flood damage prevention, shall be met to minimize flood damage to property, buildings and structures and public utilities and facilities. 2. Base flood elevation data shall be provided for subdivisions and commercial developments in accordance with chapter 13.12, section- 4.030, standards for subdivision proposals. 3. If the area being developed, or any part thereof, is located within the boundary of a designated SFHA or floodway, as delineated on FEMA maps for the county, adequate plans and specifications for protection from flooding shall be provided as herein required: a. Any subdivision or commercial development which contains land subject to flooding shall be accompanied by evidence that no appreciable expansion of the area subject to flooding would result from the proposed land development, and that the proposed development will be adequately protected from inundation without appreciable interference with the flow of any watercourse or into an impounding basin (approved drainage plan or separate engineer certification will fulfill this requirement). b. In no case shall any fill, levee, or other protective works be approved unless sufficient compensating adjustments of waterways, ditches, or impounding 25 basins are made to prevent any appreciable expansion of flood hazard areas, as determined by a licensed professional engineer. c. The centerline of all streets should be at least on the ten-year flood line. D. General safety. 1. Land which has been determined by the director, based on engineering or other expert surveys, to pose a danger to life or property by reason of its unsuitability for the use proposed, shall not be platted for that purpose, unless and until the developer has taken the necessary measures to cor rect and/or eliminate said dangers. 2. Areas that have been used for disposal of solid waste shall not be subdivided unless tests by the county health department, a structural engineer and a soils expert determine that the land is suitable for the proposed use. 3. Areas previously used for domestic sludge application shall have a soils test performed by a certified testing laboratory prior to subdivision or development which must confirm that the land is safe for the proposed use. 14.04-5.040. - Lots. A. Lot size. 1. Minimum lot size requirements and setbacks are contained in chapter 14.08. It is not permitted to average the lot areas in a subdivision to meet the minimum lot area requirements. However, conservation subdivisions shall be allowed i n accordance with the requirements of section 14.08-3.020(H). See figures 5.2 and 5.3 below for examples. FIG. 5.2 CONVENTIONAL SUBDIVISION EXAMPLE* 26 FIG. 5.3 CONSERVATION SUBDIVISION EXAMPLE* 2. All lots shall be accessible by a public street, except for: a. Lots in an approved PDD, as provided for in chapter 14.08; b. Lots on approved private access easements; and c. Lots in new subdivisions with private street(s). All private streets must meet the requirements of section 14.04-5.070(K). 3. Emergency responders and public utilities shall be uninhibited and have access to all lots by their emergency response vehicles fire trucks and public utility vehicles. 4. Lot size, width, depth, shape, grade, and orientation shall be in proper relation t o street and block design, to existing and proposed topographical conditions, and for the type of development and use contemplated. 5. Residential subdivisions involving new public streets, where proposed for areas adjacent and parallel to primary state and federal highways, shall be denied direct access to and separated from such highways by double or reverse frontage lots. Elsewhere, double frontage lots shall be prohibited. Residential reverse frontage lots shall have a minimum rear yard of 50 feet, next to the arterial street or highway, measured from the shortest distance of the proposed back building line to the street right- of-way and shall within such rear yard and immediately adjacent to the right-of-way, have a non-access planting screen easement at least 20 feet deep. 6. Side lot lines shall be aligned at approximately right angles to straight street lines and radial to curved street lines. 7. Following are the requirements for flag lots created from an existing lot of record. 27 a. Flag lots are not permitted in the suburban residential (RS) zone. b. The original lot must meet all zoning requirements specified for the respective zone in which it is located, both before and after subdivision. c. The maximum flagpole length shall be 300 feet. d. The minimum flagpole width shall be 30 feet with a ten -foot curve radius on each side on an approved private or public road, with a minimum of fifty feet (50’-0”) of frontage at the right-of-way. e. The front setback shall be measured from where the lot meets the district minimum width requirements. f. The flagpole portion of the lot is not used to calculate area, width, or setbacks of the lot or to provide off-street parking. 8. Flag lots created in new subdivisions. a. All requirements in subsection A.7 of this section, except subsection A.7.c. b. Flag lots in new subdivisions are permitted only in the RC -1, RC-2, RD-1, RD-2 and UD-2 zones. c. Flag lot access driveways, single or combined, shall be separated by a minimum of 100 feet. d. Not more than two flag lot access driveways can connect at any one point. 28 e. Any minor or major subdivision with more than 25 percent of the total number of lots as flag lots requires planning commission approval. f. When a flag lot has less than 50 feet of road frontage and is less than two acres, the pole portion of the lot cannot exceed 400 feet. 14.04-5.050. - Open space requirements. A. Applicability. The requirements of this section apply to multifamily projects and mobile home parks consisting of seven or more units or land subdivisions of 100 dwelling units or more in the RS, UD -1, and UD -2 districts. Subdivisions with all lots being five acres or more are exempt from this provision. B. General provisions for open space. 1. Land designated as open space on the approved development plan shall be maintained as open space and may not be separately sold, subdivided, or developed. 2. Access from a public street shall be provided to all designated open spaces with a minimum 15-foot-wide access including lakes or ponds within the subdivision used as open space. 3. Open space shall be contiguous wherever possible. 4. The county comprehensive plan and other plans, particularly park and open space plans, shall be considered when evaluating proposals for dedication. C. Minimum open space dedication. 1. A minimum of five percent of the total development area for subdivisions shall be dedicated as open space, and 15 percent shall be dedicated for all other projects. 2. Conservation development minimum open space dedication shall meet the requirements of section 14.08-3.020(H). D. Types of open space. The developer has the option to choose the types of open space dedicated for the development to satisfy the minimum open space requirements for this section. Dedicated open space shall fit into one or more of the following categories and be classified as private common area or public open space. The existing conditions survey (if required by section 14.04- 5.030(B)) should be used as a guide to determine the most appropriate open space type and location. 1. Playground. Playgrounds are for active recreational use and pro vide play areas and equipment for children as well as shelters with benches. Playgrounds may also be part of other types of open space, such as parks. Minimum size: 10,000 square feet. Maximum size: 20,000 square feet. 29 2. Square. Squares are areas for passive recreational use. Squares are encouraged to be entirely bounded on all sides by streets, but they can be bounde d by streets on at least 50 percent of their perimeter. Squares shall have canopy trees planted along all street frontages. Minimum size: 2,000 square feet. Maximum size: one acre. 3. Park. Parks may be for passive or active recreational use and be bounded by streets on at least ten percent of their perimeter. Large parks should create a central open space which serv ices an entire neighborhood; or incorporates physical features which are an asset to the community (i.e., lake or river frontage, high ground, significant stands of trees). Undergrowth should be limited with landscaping installed that promotes attractivene ss and safety. Parks may be combined with greenways and greenbelts and may include golf courses and community gardens. Minimum size: one acre. 30 4. Greenway. Greenways are large, irregular open spaces designed to incorporate natural settings such as creeks and significant stands of trees within and between neighborhoods. Greenways are typically more natural and may contai n irregular topography. Greenways shall incorporate active recreational uses such as, trails for walking, jogging, and biking. Greenways shall connect points of interest in the community. 5. Nature preserve. Nature preserves shall be left largely undisturbed except for the optional clearing of underbrush for a walking trail (mulch or other natural material only). Nature preserves are encouraged to protect large stands of trees, wildlife, and natural water features, and they are the preferred form of open space for steeply sloped terrain. Minimum size: three acres. E. Open space ownership and maintenance. 1. Open space may be owned by any legal means, and the owner(s) are responsible for the proper and continued upkeep and maintenanc e of the dedicated open space into perpetuity. 2. The developer shall place in a conspicuous manner upon the final plat a notation concerning control of the open space. 31 3. The developer shall provide proof of registration of the articles of incorporat ion with the appropriate state agency for the formation of the homeowners' association to the director. 4. Homeowners' associations or similar legal entities (HOAs) responsible for the maintenance and control of open spaces and common areas shall be esta blished by the developer who shall record in the register of deeds a declaration of covenants and restrictions that will govern the HOA prior to any final or bonded final plat approval. A copy of the recorded document shall be provided to the director and such document shall at a minimum, include the following: a. Provision for the establishment of the HOA is required before any lot in the development is sold or any building occupied and membership shall be mandatory for each current and future homeowner. b. The HOA has clear legal authority to maintain and exercise control over such common open space areas. c. The HOA has the power to compel contributions from all homeowners to cover their proportionate shares of the costs associated with the maintenance and upkeep of such common areas. Further, assessments levied can become a lien on the property if allowed in the mas ter deed establishing the HOA. d. The open space restrictions must remain permanent into perpetuity, and not just for a period of years. e. The HOA must be responsible for liability insurance, applicable taxes and the maintenance of open space and other facilities under their control. f. The HOA must be able to adjust the assessment to meet changing needs. g. The HOA shall be respons ible for maintaining all public storm water drainage systems and easements within the subdivision not being maintained by the county, state or other approved entity. h. It shall be expressly stated within the restrictive covenants/HOA documents that it will be the responsibility of the developer or successors or assigns to enforce such covenants or restrictions until such time as control has been transferred to the HOA board of directors. It shall be the sole responsibility of the developer, successor or assigns to correct any deficiencies prior to transfer of control over to the HOA board of directors. F. Payment in lieu of open space dedication. 1. If open space within a development is physically impractical due to unusual conditions then the county may accept a fee paid in lieu of dedication. 32 2. Fees collected in lieu of dedications and any proceeds from such transactions or sales shall be accounted for by the county finance department, and the funds shall be used by the county for the purposes of acquiring and developing recreation, greenway and open space areas as encouraged in the comprehensive plan or in any parks and recreation and greenway/bikeway master plans, and for no other purposes. The depository for such funds may be the same as permitte d other funds of the county, pending their expenditure in accordance with the terms of this code; such funds may be invested as other funds of the county. The county may, at its discretion, add additional monies to the fund for the purposes of purchasing open space and recreational land to be used for recreational purposes. 3. Refunds shall not be granted to the developer should the project not be constructed after recording of final plat or if a reduction in density occurs. 4. Such payment in lieu of dedication shall be the product of the current assessed market value of the land to be subdivided (as established in subsection F.5 below) multiplied by the number of acres to be dedicated. 5. The current assessed market value of the gross land area of th e development or subdivision at the time of submission of the required plan and/or plat shall be used to determine the land value. The current assessed market value shall be the appropriate value as determined by and maintained on file in the county assessor's office. The average value per gross acres shall be calculated from this total value and applied to the required recreational land area in order to determine the land value. Total market value of undeveloped property x Acres of required open space = Payment Total acres of undeveloped property 14.04-5.060. - Easements. A. Drainage easements. Drainage easements shall be provided whenever a development contains a watercourse, drainage -way, channel, or stream, conforming with the lines o f such watercourse, and not less than 15 feet wide or of sufficient width, as determined by the county engineer, to carry off stormwater and allow for maintenance and improvements. B. Utility easements. Utility easements, where required, shall be not les s than 15 feet wide. The location of utility easements shall be coordinated with the utility provider. C. Private access easements. Private access easements are permitted only in the RC -1, RC-2, RD-1, RD-2 and UD-1 districts, provided: 1. The easement shall be not less than 30 feet wide with a minimum of fifty feet of frontage onto a public right-of-way; 33 2. The easement shall provide access to only one lot, except in subdivisions of three lots or less in which all lots are at least one acre in size; 3. The lot(s) to be accessed must be subdivided separate and apart from the lots for which the easement is being provided, and not run through these lots; and 4. Access Easements are exempt from the requirements of section 14.04- 5.070, road standards. D. Maintenance of easements. 1. All easements are owned and shall be maintained by the property owner and no structures or trees may be placed within an easement. Easements may be used to satisfy yard and building setback requirements. 2. Covenant restrictions placed on a lot which contains an easement shall stipulate that the county, service provider or utility company shall have full right of access to said easement; 3. The county shall maintain only those easements specifically accepted for public maintenance and use. 14.04-5.070. - Road standards. A. Relationship to transportation plan. The provision of road rights -of-way shall conform to the requirements of the SCDOT Statewide Transportation Improvement Program (STIP) and Plans, the comprehens ive plan, and any other adopted county transportation plans. B. General provisions. 1. New streets in major subdivisions “shall” be, and streets in minor subdivisions “may” be located within a platted public right- of-way dedicated to the county or the S CDOT or within a platted private right- of-way deeded fee simple to a specific HOA, POA, HPR, or similar entity. 2. The design criteria contained in this section applies to roads to be accepted into the county road maintenance system which shall be constr ucted to comply with the design standards required by SCDOT. 3. Street systems shall be designed to permit the safe, efficient, and orderly movement of traffic; to have a simple and logical pattern; to respect natural features and topography; to present an attractive streetscape; and to permit linkage of major collector streets and subdivisions. 4. Proposed streets shall be coordinated with the surrounding area’s existing road network, where possible, to provide for the continuation of existing streets abutting the development. 34 5. All streets shall be opened to the exterior property lines of the development unless permanently terminated by a cul -de-sac or intersection with another street. 6. Reserve strips controlling access to public streets are pro hibited except where their control is approved by county council, under conditions approved by the planning commission. 7. No half streets shall be permitted. 8. For new developments, the minimum rights -of-way shall conform to the design standards established herein. Developments encompassing an existing county road shall provide the standard right -of-way required herein. Developments located on only one side of an existing county road, shall provide half of the required right-of-way, measured from the centerline of the existing road. 9. Access/driveway permit required. It is the responsibility of the owner of any lot fronting onto a state -maintained highway to obtain an SCDOT encroachment permit to create access, and for any lot fronting on a county -maintained road to comply with the policies adopted by the county department of roads and bridges to create access. C. Subdivision access. The planning commission may allow alternatives where access points cannot meet the minimum separation distance requi red by the SCDOT regulations. D. Alleys. Paved alleys are recommended in commercial and industrial developments for service access, off-street loading and unloading, and parking adequate for the use proposed. Paving is optional for residential alleys. See subsection J of this section for alley width requirements. E. Culs-de-sac. 1. Dead-end streets designed to be closed at one end shall not exceed 1,700 linear feet measured from the right -of-way centerline to the center point of the turnaround with turnaround points every 800 feet. 2. Turnarounds shall have a minimum turning radius of 50 feet. 3. When a stub- out or temporary dead -end street is created as a result of development phasing, a temporary all weather surfaced 50 foot turning radius turnaround shall be required when the dead-end street exceeds 150 feet. F. Intersections. 1. No more than two streets shall intersect at any one point. 35 2. All streets shall intersect as nearly as possible at 90-degree right angles. 3. Streets entering upon opposite sides of a given street shall have their center lines either directly opposite or offset a minimum distance of 200 feet, measured between the centerlines of the streets. 4. Street intersections shall be located at least 200 feet from the right -of-way of any railroad track, measured from the center point of the intersection to the railroad right-of-way line nearest the intersection. F. Connectivity. Where deemed necessary and beneficial for interconnectivity of developments, proposed public roads shall be extended by dedication to the boundary of the developing property and a temporary turnaround provided in compliance with subsection E.3 of this section. The road shall be designated and constructed as a public road except when it is determined that: 1. Physical barriers or environmentally sensitive areas to be crossed exist, such as railroads, watercourses, steep topography, or flood areas. 2. There is a large discrepancy in the size of the adjacent parcel. (A smaller parcel being subdivided m ay not have to provide a stub to a much larger parcel, if other, more desirable, interconnections are available to the large parcel.) 3. The stub road would connect to property designated for a public purpose and access to the property is not desirable f or orderly development of the road network. 4. The stub road, if extended, would cause the existing road(s) to exceed the capacity allowed on that roadway. H. Road names and signs. 1. All proposed road names must be approved by Colleton County E -911 Addressing. 2. Design and placement of traffic signs shall conform to SCDOT standards. Responsibility for installation shall rest with the developer. 3. At least two street name signs shall be placed at each four -way street intersection, and one at each "T" intersection. Signs shall be installed under streetlights, where possible, and free of visual obstruction. The design of street name signs shall be approved by the sheriff's office. I. Sidewalks. Sidewalks are optional but recommended. The following shall apply if a developer chooses to install sidewalks: 1. When a major subdivision lies within 1,500 feet (property line to property line) of an existing public school, library, or park, or where an adjoining subdivision 36 already has sidewalks in place, sidewalks should be on the same side of the street as the existing sidewalks or on one side of any new or existing roads. 2. Sidewalks shall be a minimum of five feet wide to meet ADA standards, and be a minimum of four inches thick. FIG. 5.4 SIDEWALK CONSTRUCTION 3. Sidewalks shall be placed in the right -of-way, unless a development plan calls for a different location. J. Public road construction standards. 1. The minimum street and right-of-way widths shall be as follows: Street Classification Width Right-of-Way Street/ Travelway Minor street 50' 20' Major street 66' 24' Alley 20' 12' 37 2. All public streets and roads to be dedicated for public use shall be constructed in accordance with the South Carolina Standard Specifications for Highway Construction Manual. 3. Road dedication process. a. Prepare a letter addressed to the County Administrato r requesting the road be accepted for County maintenance. Include with the letter the following: i. Petition signed by all the property owners whose land adjoins the road agreeing to the request. ii. If it exists, a copy of a plat noting property ownership alon g the road. b. The County will reply by letter to the person making the request indicating that an inspection was performed and what improvements are required before the County can accept the road. The minimum design standards to accept any road is as follows: i. The minimum amount of land needed for any road is 50 feet. If the roadway width including the drainage ditches is less than 50 feet, those property owners whose land is adjoining will have to give over to the County enough land to meet the 50 foot requirement. ii. The road must have the proper drainage in place before it can be accepted. This includes ditches, culverts, pipes or retention ponds. iii. The roadbed is to be 28 feet wide measured from shoulder to shoulder and have a 2.5” crown to allow for runoff into the ditches. All ditches must have a 0.5% grade to outfall points. c. If the road meets these standards, the County Administrator will submit a request to County Council for acceptance. Once approved, legal documents at the property owner’s cost will have to be provided to the County Administrator’s Office deeding the 50 foot road right -of-way to the County. Once the deed is recorded at the Register of Deeds Office, the road will become a part of the county’s maintenance system. d. If the road does not meet these standards, the property owners may choose to improve the road to comply with the design standards themselves or pay to the County the cost of improving the road, and permit the County to perform the necessary work. At completion, the County Administrator will request County Council accept the road into the maintenance system conditioned on the proper legal documents being submitted by the property owners dedicating the road over to the County. K. Private road construction standards. 38 1. Use and maintenance of private roads. a. A private road is permitted by right in subdivisions with less than 50 lots. Subdivisions with more than 50 lots shall be publicly owned and maintained unless approval by the planning commission is gra nted at preliminary plat review for conversion to private ownership and maintenance. b. Roads within gated communities may be private roads, regardless of number of lots. Access information shall be provided to emergency personnel so that the community c an be accessed in the event of an emergency. c. The guarantees of right of access and maintenance of private roads in the subdivision shall run with the land. The guaranteeing instrument shall be reviewed and approved by the director prior to approval of the final plat. A verified certificate, signed by the owner of the subdivided land, attesting these facts shall be placed on the final plat submitted for approval. Example: Certificate of Subdivision Lots Accessed by a Private Road Certificate of Private Road Maintenance and Disclosures I, ____________, certify that an instrument will be recorded simultaneously with the recordation of this approved final plat that guarantees: a. A right of access to any private road in the subdivision by all lots served by the road; and b. Maintenance of any private road in the subdivision at the standards set for approval. These guarantees of right of access and maintenance of t he subdivision roads shall run with the land. ______________ ___________ Owner(s) Date 2. Minimum construction standards for private roads. a. General standards and specifications for private roads. All private roads approved and constructed in the county must meet these general standards and specifications. Private Road Stand ards and Specifications Requirements Total Number of Lots 1 Served By the Private Road Less Than 50 Lots Greater Than 50 lots Nonresidential Right-of-way width 50 ft. 50 ft. 50 ft. Travel-way width 18 ft. 24 ft. 24 ft. 39 Lane width 9 ft. 12 ft. 12 ft. Private road surface/travel-way material Dirt, gravel, or paved Dirt, gravel, or paved Paved SCDOT Standards SCDOT road geometry and specifications Yes Yes Yes Professional surveyor certification of road in platted right-of-way required Yes Yes Yes 1 Total number of lots served shall include the residual acreage of the tract being subdivided, where such residual acreage will be accessed by the private road. b. Private road maintenance. Maintenance of the private road shall be provided by the lot owners served by the road or an established HOA. A road maintenance agreement and declaration between the lot owners is required to insure the cost is shared, and a mechanism for maintenance is set up where a homeowners associatio n is not created. The responsibility for maintenance is the property owners', and not the state nor the county. c. Road maintenance agreement requirements. The developer shall have an instrument recorded simultaneously with the final plat substantially in the form of the county's standard road maintenance agreement in article 14.04 - 7. L. Stormwater drainage facilities. 1. The internal storm drainage system shall be designed to accommodate the appropriate design storm based on the location of the street /development. The roadway drainage system (the road surface, curb and gutter where provided) must be designed for a ten -year storm return frequency design and shall follow the design criteria as outlined in the South Carolina Stormwater Management and Sedi ment Control Handbook (SCSMSCH), current edition, for all unincorporated properties in the county. 2. Any off -site stormwater runoff onto the proposed development must be accommodated. Design parameters and coefficients used in all calculations for off-site stormwater shall be based on the projected build- out of the basin. The design storm shall be dictated by these standards with due consideration given to downstream system capacity. 3. In general, ditches shall be constructed to provide drainage from the road and adjacent areas. The ditches shall be built with sufficient depth and width to carry the expected volume of water. The side slopes shall be graded so they can be stabilized and prevent vehicles from becoming stuck if they enter them. 4. All d evelopment shall be subject to the provisions of the SCSMSCH, current edition. Developers of any proposed commercial development or subdivision must obtain a permit from the SCDHEC and OCRM offices, where required. 40 5. If an SCDHEC Stormwater permit is no t required, then any residential development with an overall density of two dwelling units per acre or higher and all commercial developments require a drainage plan which meets OCRM design standards. All other projects are exempt. 6. An approved OCRM drainage plan fulfills the requirements of this section. 7. All drainage plans shall be certified by a South Carolina licensed professional engineer. 14.04-5.080. - Utilities standards. A. Community water and sewer (public and private). 1. All subdi visions and commercial developments shall be provided with water supplies and sanitary sewer systems approved by the SCDHEC. 2. The water supply system shall be adequate to handle the domestic demand, plus the fire flow, based on the completed development. 3. The sanitary sewer system shall be adequate to handle the necessary flow based on the completed development and peak usage. 4. Said facilities shall be "stubbed out" prior to road surfacing. 5. If the subdivision is to have a water or sewer system other than one connected to a public system, said systems are required to receive approval from the SCDHEC prior to preliminary plat submittal. 6. Where a central water system is provided for a development, three -way fire hydrants shall be installed by the developer in accordance with section 14.04- 5.090(A) with two 2½-inch and one 4½-inch fire department connections (NST). 7. Community water and/or sewer systems shall be installed prior to final plat approval unless such installation is guaranteed in accordance with section 14.04- 3.050. B. Wells and septic tanks. 1. A subdivision or commercial development using individual septic systems and/or wells shall conform to those requirements as set forth by SCDHEC. It is not required for a well or septic system to be installed prior to the sale of any lot. 2. A private septic system may be located off site for conservation subdivisions provided that the location of such system is noted on the final plat as a septic field utility easement. C. Street lighting (optional). 41 1. Where street lighting is proposed, the following standards shall apply. 2. Street lighting shall be Light- Emitting-Diode (LED) where possible, and provided at all public street intersections, and midway between intersections located more than 800 feet apart; provided such spacing shall not be less than 400 feet between streetlights. 3. The maximum height of streetlights shall be 25 feet. 4. Street lighting shall be properly shielded so as not to create a hazard to drivers or a nuisance to residents. 14.04-5.090. - Emergency management. A. Fire hydrants. 1. Where sufficient water flow and pressure exist, as determined by the county fire marshal and approved by the appropriate water provider, the developer shall install fire hydrants throughout each subdivision or commercial development to maintain a maximum 500 -foot radius between hydrants, as approved by the fire marshal. 2. Unless no practicable alternative is available, water lines shall be looped wherever possible an d not contain dead- end lines for pressure and volume equalization throughout the system. B. Fire suppression requirements. 1. For any subdivision or commercial development without a fire suppression rated water system, that has access to an adequate per manent surface water supply (100,000 gallon storage in a 50- year drought), the applicant shall install a dry fire hydrant system. An all- weather access road for firefighting equipment shall be provided by the applicant to this permanent surface water supply. 2. Where the subdivision or commercial development is neither served by a public water system nor has access to an adequate permanent surface water supply, such systems shall be reviewed by the director and fire marshal to determine alternative measures to ensure adequacy of fire protection. 14.04-5.100. - Surveying and markers. All land developments within the jurisdiction of this chapter shall be surveyed, platted, and marked in accord with the Minimum Standards Manual for the Practice of Land Surveying in South Carolina, as promulgated by S.C. Code 1976, title 40, chapter 21. This manual is hereby adopted by reference and is as much a part of this chapter as if contained herein. 14.04-5.110. - Construction procedures. 42 A. No construction or ins tallation or improvements shall commence in a proposed subdivision or commercial development until the preliminary plat, existing conditions survey, site plan and construction drawings have been approved by all appropriate authorities. B. No building, zoning or other permits shall be issued for erection of a structure in any subdivision or commercial development until all the requirements of this chapter have been met. The approving authorities having jurisdiction or their representatives shall inspect and approve all completed work prior to release of any sureties. ARTICLE 14.04-6. - DEFINITIONS Sections: 14.04-6.010. - Purpose. 14.04-6.020. - Interpretation. 14.04-6.030. - Acronyms. 14.04-6.040. - Definitions. 14.04-6.010. - Purpose. For the purpose of interpreting chapter 14.04 and chapter 14.08, certain words, concepts, and ideas are defined herein. Except as defined herein, all other words used in these chapters shall have their everyday meaning as determined by their dictionary definition. 14.04-6.020. - Interpretation. A. Words not defined herein shall have the meanings stated in the Standard Building, Plumbing, Electrical, Gas, or Fire Prevention Codes. Words not defined in the standard codes shall have the meanings in Webster's Tenth Edition Collegiate Dictionary, as revised. B. Words in the present tense include the future tense and vice -versa. Words used in the singular include the plural, and vice-versa. C. The terms "shall" or “must” are always mandatory. D. The terms "may" or “can” are permissive. E. The term "lot" includes the word "plot" or "parcel." F. The term "person" includes a firm, association, organization, partnership, trust company, or corporation, as well as an individual. G. The term "planning commission" refers to the county planning commission. H. The term "council" refers to the county council. I. Any word denoting gender includes the female and the male. 43 J. The term "structure" shall include the word "building." K. The term "street" shall include the word "road." L. The term “zoning board of appeals” refers to the county zoning board of appeals. M. The term “used” or “occupied” as applied to any land or building shall be construed to imply that said land or building is in actual use or occupancy and shall be construed to include the words " intended," "arranged," or “designed” to be used or occupied. N. The term “map” or “zoning map” shall mean the official zoning map of Colleton County, South Carolina. 14.04-6.030. - Acronyms. Following is a list of acronyms (other than zoning districts) and their meanings found throughout chapter 14.04 and chapter 14.08: BFE Base flood elevation DUA Dwelling units per acre FEMA Federal Emergency Management Agency FIRM Flood insurance rate maps HOA Any legal type of Home Owners Association ROW Right-of-way / Rights-of-way OCRM Ocean and Coastal Resource Management SC South Carolina SCDHEC / DHEC South Carolina Department of Health and Environmental Control SCDOT / DOT South Carolina Department of Transportation US / USA United States of America 14.04-6.040. - Definitions. The following words, terms and phrases, when used in chapter 14.04 and chapter 14.08, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Abutting means sharing a common border; physically touching. Agricultural production/activity means land used exclusively as a bonafide agricultural operation by the owner and/or tenant. The use of land for agricultural purposes including farming, fis h culture, bees for honey production, animal and poultry husbandry, and the necessary accessory uses for packing, treating, curing or storing the 44 produce or product, provided that the operation of the accessory use is clearly incidental to the agricultural activity. Uses which shall not be classified as agricultural production or uses, for the purposes of this chapter, include zoos, kennels, or riding stables and academies. Agricultural support services includes the operation, management, conservation, improvement, and maintenance of a farm and the structures on the farm, including building repair, replacement, expansion, and construction incidental to the farming operation; and/or the marketing and selling of agricultural products, agro- tourism, the storage and use of materials for agricultural purposes, packing, treating, processing, sorting, storage, and other similar activities performed to add value to crops, livestock, and agricultural items produced on the farm. Airport elevation means the established elevation of the highest point on the usable landing area. Airport hazard means any structure, tree, or use of land which obstructs the airspace required for, or is otherwise hazardous to the flight of aircraft in landing or taking off at the airport. Airport reference point means the point established and designated as the appropriate geographic center of the airport landing areas. Animal production means the dairying, raising, management, care, and training of livestock, including horses, bees, poultry, and other animals for individual and public use, consumption, and marketing. Animal services means a public or private facility for medical or surgical treatment, grooming, breeding, selling, or boarding of animals. Unless outdoor kenne ls are specifically allowed, all facilities associated with animal services shall be located indoors. Automotive services means any building, premises, and land, in or upon which the primary use of land is a business which involves the maintenance, servi cing or sale of new or used automobiles, motorcycles, boats or other motor vehicles generally and including recreation vehicles and any vehicle leasing, rental, parking service, preparation or repair work conducted. The term "automotive services" includes but is not limited to auto dealerships, auto body shops, auto service stations, boat repair or sales, car washes, convenience stores, gas stations, truck stops, and oil/lube servicing. This does not include the sale of parts or related products (i.e., auto parts store). Bed and breakfast inn means any owner -occupied dwelling or portion thereof offering rooms and meals at breakfast to transient lodgers in return for compensation. Buildable area means that portion of any lot which may be used or built upon in accordance with the regulations governing the zoning district within which the lot is 45 located when the front, side and rear yard, open space, and applicable buffer area requirements have been met. Building/structure, accessory, means a subordinate s tructure on the same lot as the principal or main building or use occupied or devoted to a use incidental to the principal use. Included in this definition are private garages, storage sheds, workshops, animal shelters, pool houses, etc., when detached from the principal buildings, and carports attached to the principal building when at least 75 percent open or unenclosed. Building/structure, alteration means any act or process that changes or alters some or all of the exterior architectural features of a structure, including, but not limited to, the addition onto or reconstruction of any structure. Building/structure, principal, means a building in which the main or principal use is, or is intended to be conducted. Campgrounds means land containing fi ve or more campsites which are located, established, or maintained for occupancy by people in temporary living quarters, such as tents, recreational vehicles, or travel trailers which are primarily used for recreation or vacation purposes. Canopy tree means a deciduous tree that forms the top layer of vegetation in a forest. Examples of such trees include oaks, hickories, maples, and poplars, among others. Cemetery, accessory, means a portion of property used for the interment of the dead. An accessory cemetery is located at the site of another principal use such as a religious institution or place of worship. A cemetery shall not be used for the preparation, embalming or cremation of bodies. Cemetery, family, means a family plot used for the interment of the dead of a family member related by blood, marriage, or adoption. A cemetery shall not be used for the preparation, embalming, or cremation of bodies. Cemetery, principal, means property used principally for the interment of the dead, which use ma y include the commercial sale and location of burial lots, plots, crypts, or vaults for use exclusively on the subject property. A cemetery shall not be used for the preparation, embalming, or cremation of bodies. Certificate of occupancy (C of O) means a certificate issued by the building official which certifies that a structure has been erected in accordance with all applicable county zoning, development and building codes, the effect of which shall permit the occupancy of a building. Certificate of occupancy, Temporary (TCO) means a temporary 30, 60 or 90- day certificate issued by the building official which certifies that a structure has been erected in accordance with all applicable county codes, which allows for the stocking of shelves, 46 furnishing of space, or installation of specialized equipment prior to the final inspection and issuance of the certificate of occupancy. Commercial development means the changing of land characteristics through development, redevelopment, and/or construct ion of any use other than single or two- family residential is classified as a commercial development, such as: apartments and condominiums; commercial parks, centers, and subdivisions; industrial parks; manufactured home and RV parks; and, similar developm ents for profit, sale, lease, or any combination having owner-rental characteristics. Community sewer system means infrastructure to remove waste water within a development that is not connected to a public sewer system where the lots are not on individual septic tanks. Such systems shall be approved by the SCDHEC. Community water system means infrastructure to deliver water within a development that is not connected to a public water system where the lots are not on individual wells. Such systems shall be approved by the SCDHEC. Conditional use means a use of land or structure, which is permitted in a zoning district with conditions for approval, as specified in chapter 14.08. Condominium means a unit in a multi-unit structure owned by an individual who has shared use of all common areas associated with that structure with the other individuals who occupy the same multi-unit structure. Day care services means and includes any home, center, agency, or place, however styled, where children, elderly, and other persons not related to the operator are received for custodial care, apart from their parents, whether for compensation, reward, or otherwise during part or all of the day and for any number of successive days. Density means the number of dwell ing units per acre of land developed or used for residential purposes. Developer means a person, individual, partnership, or corporation (or agent therefor) that undertakes the activities covered by these regulations. Development means any manmade chan ge to real estate, including, but not limited to, the construction of buildings or other structures, mining, dredging, filling, grading, paving, excavation, or drilling operations. Domestic animal shelter means a pen, shelter, or structure where no more than three dogs or small domestic animals, not to include farm animals, such as horses, cows, goats, swine including pot -bellied pigs, sheep, ponies, grazing animals, and fowl of any kind, are boarded and kept. 47 Drainage means the removal of surface or gr oundwater from land by drains, grading, or other means. Driveway means a paved or unpaved area used for ingress and egress to a property from a street or road by motor vehicles. Dwelling means a building or portion of a building constructed for human habitation, typically with cooking, sleeping, bathing, and toilet facilities. Dwelling unit means a single unit that fits the description of a dwelling. Dwelling, apartment. See Dwelling, multi-family. Dwelling, detached , means a single dwelling unit, surrounded by open space or yards and which is not attached to any other dwelling by any means. Dwelling, duplex, means a single building containing two dwelling units. Dwelling, multi- family, means a single building containing five or more dwelling units. Dwelling, patio house , means a single -family detached or semi -detached dwelling unit. It is built on a small lot generally enclosed by walls, which provide privacy. The term is synonymous with zero lot line dwellings. Dwelling, quadruplex, means a single building containing four dwelling units. Dwelling, residential designed manufactured home, means a single-family dwelling unit built according to the Federal Manufactured Housing Construction and Safety Standards (245 CFR 3280) HUD Code, 6-15-76, and which: 1. Has a minimum width over 20 feet (multiple section); 2. Has a minimum of 900 square feet of enclosed living area; 3. Has a minimum 3:12 roof pitch; and has a type of shingle commonly used in standard residential construction; 4. Is cove red with an exterior material customarily used on site built homes, including vinyl or aluminum lap siding, wood, masonite, or other materials similar to the exterior siding commonly used in standard residential construction; and 5. Has a roof overhang of not less than eight inches. Dwelling, single-family, means a single building containing one dwelling unit. Dwelling, standard designed manufactured home , means a single -family dwelling unit built according to the Federal Manufactured Housing Constructi on and Safety Standards (24 CFR 3280) HUD Code, 6-15-76, and which does not meet the definition of a residential designed manufactured home. 48 Dwelling, townhouse , means a series of attached single -family dwelling units on separate lots, which may or may n ot have a common roof and are separated from each other by common or shared vertical walls. Dwelling, triplex, means a single building containing three dwelling units. Dwelling, zero lot line , means a zero lot line dwelling is a single family detached unit which instead of being centered on a lot, is placed against at least one of the side lot lines. The term is synonymous with patio homes. Easement means a strip of land extending along a property line or across a lot, for which a limited right of use has been granted for a public or quasi -public purpose and within which the owner of the property shall not erect any trees or permanent structures. Emergency services means police department, fire department, rescue squad, emergency medical technicians, ambulatory services, or similar services that respond in the event of an emergency. Evergreen tree means a coniferous or other type of tree that remains green throughout the year. Family means one or more persons related by blood, marriage, adoption, or guardianship, and not more than four persons not so related, except that mentally and physically handicapped persons for whom care is provided on a 24- hour basis shall be construed to be a family, in accordance with the provisions of S.C. Code 1976, § 6-7-830. Family group development means a group of up to six individual detached dwelling units allowed on a single lot of record occupied only by persons related by blood, marriage, adoption, or guardianship, where all units comply with the density and s etback requirements for the zoning district where the lot is located, except where prohibited in the RS, CC, VC, LID and ID zoning districts. Farm Strusture means a structure less than 5,000 sq. ft., located on no less than five (5) acres in the RC-1, RC-2, RD-1 or RD -2 zoning districts that is being used as a farm for agricultural production purposes, which is not a public livestock area or a residential dwelling unit, which does not have cooking or sleeping amenities or facilities, with or without restroom facilities, a SCDHEC approved septic tank system and electric service not to exceed 200 Amps, where the use is exclusively associated with the production, harvesting, storage, drying or raising and growing of agricultural commodities, including livestock, fowl and bees for honey, or similar commonly known commodities. Further, the owner agrees to prohibit public access to the structure and sign the “Farm and Accessory Use Structure Non- Conversion Affidavit” which certifies that the structure c annot be converted to a residential dwelling unit or a commercial use, without prior proper zoning and building permit approvals for such conversion, as may be 49 allowed by the zoning and building codes in effect at the time of conversion and change of use request. Federal manufactured home construction and safety standards means regulations promulgated by the Department of Housing and Urban Development (HUD) governing the design and construction of manufactured housing. These standards also set performance requirements for heating, plumbing, air conditions, thermal, and electrical systems. Floor means the top surface of an area in a building that is walked on and makes contact with people’s shoes, from the basement floor to the top floor of a building. Floor area ratio means an intensity measure of land use derived at by dividing the total floor area of a building by the total site area. Fuel supply services means a business that distributes petroleum, biodiesel, or similar fuel products for motor vehi cles. This does not include gas -selling stations or convenience stores, which are a type of automotive service. Such businesses may have above-ground or below-ground tanks. Garage, private means a structure built to park vehicles inside of it that is for private use only. Garage, public means a structure built to park vehicles inside of it that is used by the general public. Grandfathered/Legal Nonconformity means and describes the status accorded certain properties, uses, structures and activities that legally existed prior to the date of adoption of the current/active zoning ordinance which changed its classification from conforming to nonconforming, where the nonconformity now exists as a legal nonconformity, and where the nonconformity may continue without limitation unless discontinued or abandoned for six (6) months, which then requires the nonconformity to be brought into compliance with the current codes in effect at the end of that six (6) month period of discontinuance and/or abandonment. Gross floor area (GFA) means the combined sum of the floor area, measured horizontally, where the floor area for every floor or story of a building is added to the sum, including basements and attics, measured from the exterior faces of the structure. It does not include unenclosed porches or detached accessory buildings. Habitable dwelling means a dwelling meeting the minimum habitability requirements of this chapter, and other applicable regulations. Hazard to air navigation means an obstruction determi ned to have a substantially adverse effect on the safe and efficient utilization of the navigable airspace of an airport. 50 Heavy construction contractor means a construction contractor that utilizes heavy equipment including but not limited to earthmoving equipment and/or cranes. Height means the vertical distance measurement from the top of a structure or vegetation to the ground directly beneath the structure or vegetation. Home occupation means any occupation within a dwelling, or an accessory build ing clearly incidental thereto, carried on by a member or members of the family residing on the premises, which in no way changes the residential character or nature of the neighborhood. Improvement means any man -made immovable item that becomes part of, placed upon, or affixed to the ground or a structure. Instrument runway means a runway equipped with a precision electronic navigation or landing aid suitable to assist the landing of aircraft by an instrument approach under restricted visibility conditions. Kennel, outdoor, means any outdoor place or structure used in whole or in part for the purpose of keeping, housing, or raising 24 or more animals in any combination, outside of a fully enclosed structure, whether the animals are boarded, pet animal rescues, or household pets. Larger than utility runway means a runway that is constructed for and intended to be used by propeller driven aircraft greater than 12,500 pounds maximum gross weight and jet-propelled aircraft. Livestock means the keeping or raising of cattle, sheep, goats, swine, horses, donkeys, mules, burros, buffalo, llamas, or similar animals. Lot means a parcel of land considered as a unit. The terms "lot," "lot of record," "property," or "tract," whenever used in these chapters, are interchangeable. Lot area means the horizontal area contained within the boundary lines of a lot. Lot depth means the horizontal distance between the front and rear lot lines. Lot line means a line bounding a lot which divides one lot from another or from a street or any other public or private space. Lot of record means a lot, the boundaries of which are filed as a legal record. Lot width means the horizontal distance between the side lot lines measured at right angles to its depth along a stra ight line parallel to the front lot line at the minimum required building setback line. 51 Lot, corner, means a lot located at the intersection of two or more streets. Lot, existing, means a lot that was recorded prior to the adoption of the ordinance from which this chapter is derived (December 5, 2000) which is the same as when it was initially recorded. Lot, interior , means a lot, other than a corner lot, which has frontage on only one street other than an alley. Lot, through or double frontage , means a lot which has street frontage on two opposing ends of the lot. Lot, flag, means a lot having only its narrow access wa y to the lot (aka the flag pole) fronting onto a public or private road or access easement, with the bulk of the lot (aka the flag) set back from the road. (See lot definition detail above.) Manufactured home park means a lot with the size and improvemen ts needed to support the long-term parking of three or more manufactured homes, which may include resident services and facilities. Manufactured home park space means the individual space within a manufactured home park designed to accommodate one unit. Manufacturing, heavy, means the ass

Text truncated. Open the original for the full document.

Source: Colleton County website. First collected Oct 13, 2026.