AGENDA
EDGEFIELD COUNTY COUNCIL MEETING
County Council Chambers
June 2, 2026
6:00 PM
1
Council’s meetings shall be conducted pursuant to the South Carolina Freedom of Information Act, Council’s Rules ,
and Robert’s Rules of Order, latest edition, in the event Council’s Rules do not cover the procedural issue at hand.
This agenda may be modified prior to or during the meeting.
I. CALL TO ORDER
Invocation
Pledge of Allegiance
II. APPROVAL OF AGENDA
III. SPECIAL RECOGNITION
Employee of the Quarter – M. L. Rowe, Shop Mechanic
SC EMS Association Team Impact Award – Brianna Shipman
IV. APPROVAL OF THE MINUTES
May 5, 2026, Regular Meeting Minutes
V. COMMENTS FROM THE PUBLIC
Agenda Items other than Public Hearing Matters
Edgefield County Code of Ordinances, Chapter 2, Section 2-52, Rule 23 governs public comments. Any citizen may sign up to speak at
any regular meeting of the county council on matters pertaining to county services and operations, but not on personnel matters.
Interested citizens may sign an agenda list maintained by the Clerk to Council prior to each regular meeting. Each citizen shall be eligible
to speak for a maximum of 5 minutes. Additionally, the period for citizen comments shall be limited to a total of 30 minutes. All citizens
participating in the citizen comment period shall be subject to recognition by the presiding officer and shall address the presiding officer
directly. The comment period should not be a debate period between Council members and members of the public. Written comments
may be submitted to the Clerk to Council at any time.
VI. REPORTS
Monthly Reports 2025
Agenda/Minutes of the following m eetings
Planning Commission Work Session Minutes
Planning Commission Regular Meeting Minutes
(SEE DEPARTMENTAL REPORTS)
VII. CONSENT AGENDA
While developing the agenda, routine or noncontroversial items are placed on the consent agenda, which is a part of the
regular agenda. If any member objects to including an item on the consent agenda, that item shall be moved to the
regular agenda as an action item requiring discussion. The remaining consent items shall be adopted in a single vote
without discussion.
1. Consideration of Reappointment to the Board of Edgefield County Water and Sewer
Authority.
Michael Washington Reappointment
Carroll Clark Reappointment
AGENDA
EDGEFIELD COUNTY COUNCIL MEETING
County Council Chambers
June 2, 2026
6:00 PM
2
VIII. PUBLIC HEARINGS
1. Ordinance 25-26-009, an ordinance to amend Section 24-31 (Land Use Table) to only
allow data centers in ID (Industrial) zoned areas of Edgefield County, and subject them to
certain conditional use regulations.
IX. OLD BUSINESS
1. Consideration of Approval of the Third Reading of Ordinance 25-26-008, an Ordinance
Providing for the FY 2026-2027 General Operating Budget and Establishing Ancillary
Budgets for E-911 Administration, Economic Development, Solid Waste Disposal,
Victims’ Bill of Rights, Emergency Medical Services, Road Maintenance, Tri-County
Solicitor, assistant Solicitor, School Resource Officer #1 to School Resource Officer #9,
Event Security, Sheriff Discretionary Funds, Clerk of Court Discretionary Funds, Pre
Trial-Intervention and Criminal Domestic Violence.
The FY 2026-27 General Operating budget and Special Revenue Fund budgets are
included for your review. The total general operating budget is expected to be
$18,549,177. In FY 2025-26, the general operating budget was $16,973,794. The
County anticipates using $844,092 of the fund balance to balance the operations in
the general fund. Elected Officials and Department Heads have worked hard to
keep their requests to a minimum. This will still leave approximately 4.3 months of
operating expenditures in our reserves. There is no millage increase.
Exhibit I
2. Consideration of Approval of Second Reading of Ordinance 25-26-009, an ordinance to
amend Section 24-31 (Land Use Table) to only allow data centers in ID (Industrial)
zoned areas of Edgefield County, and subject them to certain conditional use regulations.
The Planning Commission has recommended a Data Center Ordinance for
Council’s consideration. After consultation with staff and our Economic Developer,
we revised the recommended ordinance to its current form to better reflect the
County’s needs and restrictions.
Exhibit II
X. NEW BUSINESS
1. Consideration of Approval of First Reading of Ordinance 25-26-010, an ordinance to a
apply an Impact Fee to new construction in Merriwether and Countyline Fire Districts
and the Edgefield County portion of the City of North Augusta.
Exhibit III
2. Consideration of Approval of First Reading of Ordinance 25-26-011, an ordinance
authorizing the issuance and sale of general obligation bonds, series 2026 or such other
appropriate series designation, of Edgefield County, South Carolina, in the principal
amount of not exceeding $6,250,000; fixing the form and details of the bonds;
authorizing the county administrator to prescribe certain details relating to the bonds;
AGENDA
EDGEFIELD COUNTY COUNCIL MEETING
County Council Chambers
June 2, 2026
6:00 PM
3
providing for the payment of the bonds and the disposition of the proceeds thereof; and
other matters relating thereto.
Edgefield County does not currently have an open GO Bond. This proposed bond
will fund the purchase of parcels 174-00-00-077-000 and 174-00-00-030-000 at the
Industrial Park, construct an EMS Headquarters, and repair County-owned
buildings.
Exhibit IV
XI. COMMENTS FROM THE PUBLIC
All additional comments
Edgefield County Code of Ordinances, Chapter 2, Section 2-52, Rule 23 governs public comments. Any citizen may sign up to speak
at any regular meeting of the county council on matters pertaining to county services and operations, but not on personnel matters.
Interested citizens may sign an agenda list maintained by the Clerk to Council prior to each regular meeting. Each citizen shall be
eligible to speak for a maximum of 5 minutes. Additionally, the period for citizen comments shall be limited to a total of 30 minutes.
All citizens participating in the citizen comment period shall be subject to recognition by the presiding officer and shall address the
presiding officer directly. The comment period should not be a debate period between Council members and members of the public.
Written comments may be submitted to the Clerk to Council at any time.
XII. REPORTS FROM COUNTY COUNCIL MEMBERS
XIII. REPORT BY THE COUNTY ADMINISTRATOR
XIV. COMMENTS BY THE COUNTY COUNCIL CHAIR
XV. ADJOURN
State of South Carolina )
)
County of Edgefield )
WHEREAS:
Accommodations Tax 250,000
Animal Control 57,500
ARPA funds -
Bond Revenue -
Building & Planning 597,000
Clerk of Court 443,600
County Archives 1,700
Current Year Property Tax 5,690,000
Other Taxes 187,000
Federal Detention Reimbursment 816,000
Fund Transfers 290,000
Homestead Exemption 400,000
Local Government Fund 1,690,000
LOST Property Tax Credit 2,600,000
LOST Revenue 1,040,000
Magistrate's Office 425,500
Manufacturer's Exempt 100,000
Other Revenues 732,335
Motor Carrier 190,000
Probate Court 47,750
Recreation 170,300
Rent & Reimbursements 22,000
Sheriff's Office 4,600
Tax Assessor 1,300
Tax Collector 340,000
Treasurer 103,000
Unrestricted Reserves 844,092
Vehicle Tax 1,500,000
Veteran's Affairs 5,000
Voter Registration -
Section 2. The Edgefield County Council hereby authorizes and directs the Edgefield County Auditor to levy upon the taxable property in
Edgefield County, South Carolina ad valorem taxes necessary to meet all budget requirements, except as provided for by other revenues, for
county operations and debt service for the fiscal year beginning July 1, 2026 ending June 30, 2027.
Section 3. The County Treasurer is hereby directed to collect said ad valorem taxes and all other revenues which may accrue to Edgefield
County from all sources, pursuant to law, during Fiscal Year 2026-2027.
Section 4. The Edgefield County Council approves Revenues and Appropriations for FY 2026-2027 for County operations below:
ORDINANCE NO. 25-26-008
Revenues for the Fiscal Year 2026-2027 General Operating Budget total $18,549,177. Sources of funding include the following categories:
“An Ordinance Providing for the FY 2026-2027 General Operating Budget and Establishing Ancillary Budgets for Debt Service,
E-911 Administration, Economic Development Fund, Solid Waste Disposal, Victims’ Bill of Rights, Emergency Medical Services,
Road Maintenance, Tri-County Solicitor, Assistant Solicitor, School Resource Officer #1-9, Event Security,
Sheriff Discretionary, Clerk of Court Discretionary, Pre Trial Intervention, and Criminal Domestic Violence.”
1. The Edgefield County Council, in accordance with § 4-9-30 (5) of the South Carolina Code of Laws 1976, as amended, has the authority to
prepare an annual budget for all Departments and Agencies of the County Government; and
2. The annual County budget shall be based upon estimated revenues and shall provide appropriations for County operations and debt
service for all County Departments and Agencies; and
3. Pursuant to state statutes, total funds appropriated in Fiscal Year 2026-2027 for the above purposes shall not exceed estimated revenues
and funds available for expenditure in Fiscal Year 2026-2027.
NOW THEREFORE BE IT ENACTED:
Section 1. The Edgefield County Council hereby adopts the Fiscal Year 2026-2027 County Budget for Edgefield County, South Carolina, of
which a detailed copy is herein incorporated.
General Fund Revenues
Worthless Check 500
Total General Fund Revenues 18,549,177
ABBE Regional Library 238,480
Alcohol & Drug Abuse 75,000
Animal Control 349,769
Auditor 199,070
Beckman Center 2,000
Building & Planning 581,800
Building Maintenance
Fuel Site 6,000
Courthouse 69,500
Council Chamber 7,000
Solicitor/Courthouse Annex 2,400
Department of Social Services 26,500
Administration Building 10,400
Agriculture Building 14,300
Health Department 3,250
Voter Registration 7,980
Edgefield County Park (Bettis) 21,700
Recreation Department 31,500
LEC 294,500
Sweetwater Community Center 33,500
County Maintenance Garage 3,800
Kneece Building 20,000
Circuit Judge -
Clerk of Court 818,603
Coroner 263,420
County Administration 861,315
County Agent 1,000
County Archives 82,920
County Council 576,786
County Jail 2,709,900
County Maintenance 150,698
Court Cost 27,800
Delegation Secretary 9,475
Department of Social Services 500
Dispatch 877,000
Edgefield Health Department 6,500
Eleventh Judicial Solicitor 369,115
Emergency Management 268,330
Employment & Social Security 232
GIS/ Special Projects 119,526
Information Technology 362,385
Magistrate's Office 723,920
Medical Indigent 38,000
Miscellaneous 63,105
Countywide 1,913,000
Piedmont Tech 90,000
Probate Court 302,468
Probation Officer 100
Recreation 489,628
Registration & Election 233,600
Risk Management 300
Senior Citizens 3,000
Sheriff's Office 4,099,754
Soil & Water Conservation 7,000
Tax Assessor 416,000
Tax Collector 161,531
Treasurer 263,267
Tri-County Public Defender 84,456
Tri-County Solicitor Maintenance Contract 250
Tri-County Youth Services (DJJ rent Piedmont) 7,400
General Fund Expenditures
Upper Savannah COG 20,619
Veteran's Affairs 127,825
18,549,177
ANCILLARY FUNDS
Maintenance of Roads & Bridges
Revenues:
Road Maintenance Fee 860,000
Unrestricted Reserves
Other 325,013
National Forest Funds 16,000
Total Maintenance of Roads & Bridges Revenues 1,201,013
Total Expenditures 1,201,013
EMS
Revenues:
Property Taxes 2,436,575
Delinquent Property Tax 55,000
Vehicle Tax 475,000
User Charges 1,112,000
Grant Fees 7,000
Other 66,000
Unrestricted Reserves 21,275
Total EMS Revenues 4,172,850
Total Expenditures 4,172,850
E911
Revenues:
E911 Surcharges 45,000
State Reimbursement 75,000
Other State Funds -
Unrestricted Reserves 25,317
CTC Salary Supplement 9,390
Other 12,000
Total E911 Revenues 166,707
Total Expenditures 166,707
Economic Development
Revenues:
Property Taxes 93,700
Multi-County Ind. Park 150,000
Other 12,500
Unrestricted Reserves -
Total Economic Development Revenues 256,200
Total Expenditures 256,200
Solid Waste Fund
Revenues:
Solid Waste User Fees 1,514,983
McCormick County Site Rental 12,046
Other 400
Unrestricted Reserves -
Total Edgefield Solid Waste Fund Revenues 1,527,429
Total Expenditures 1,527,429
Total General Fund Expenditures
Section 5. The FY 2026-2027 General Operating Budget provides for the per diem GSA rate and the mileage rate as per current IRS rate for
Fiscal Year 2026-2027.
Tri-County Solicitor
Revenues:
Edgefield County 369,115
Saluda County 295,291
McCormick County 155,848
Balance brought forward -
Total Tri-County Solicitor Revenues 820,254
Total Expenditures 820,254
Assistant Solicitor
Revenues:
Misc income 760,870
Restricted Funds 748,563
Total Assistant Solicitor Revenues 1,509,433
Total Expenditures 1,509,433
Victim's Bill of Rights Fund
Revenues:
Assessments 18,000
Other -
Transfer 67,420
Unrestricted Reserves -
User Charges 15,000
Total Recreation Revenues 100,420
Total Expenditures 100,420
School Resource Officer #1 Strom Thurmond HS
Revenues:
Miscellaneous Income 20,384
Edgefield County School District 81,534
Total School Resource Officer #1 Revenues 101,918
Total Expenditures 101,918
School Resource Officer #2 JET Middle School
Revenues:
Miscellaneous Income 22,161
Edgefield County School District 88,645
Total School Resource Officer #2 Revenues 110,806
Total Expenditures 110,806
School Resource Officer #3 Fox Creek HS
Revenues:
Miscellaneous Income 23,254
Fox Creek High School 91,269
Total School Resource Officer #3 Revenues 114,523
Total Expenditures 114,523
School Resource Officer #4 Merriweather Middle School
Revenues:
Miscellaneous Income - Grant 107,243
Edgefield County School District
Total School Resource Officer Grant Revenues 107,243
Total Expenditures 107,243
School Resource Officer #5 Merriweather Elementary School
Revenues:
Miscellaneous Income - Grant 101,854
Edgefield County School District
101,854
Total Expenditures 101,854
School Resource Officer #6 Douglas Elementary School
Revenues:
Edgefield County School District
Miscellaneous Income - Grant 97,149
97,149
Total Expenditures 97,149
School Resource Officer #7 Bettis Academy Prep
Revenues:
Edgefield County School District 108,603
Total School Resource Officer #7 Revenues 108,603
Total Expenditures 108,603
School Resource Officer #8 Storm Thurmond CTC
Revenues:
Miscellaneous Income - Grant 102,976
Total School Resource Officer #8 Revenue 102,976
Total Expenditures 102,976
School Resource Officer #9 Johnston Elementary
Revenues:
Miscellaneous Income - Grant 101,874
Total School Resource Officer #9 Revenue 101,874
Total Expenditures 101,874
School Resource Officer #10 FCMS
Revenues:
Miscellaneous Revenue 188,253
Total School Resource Officer #10 Revenue 188,253
Total Expenditures 188,253
School Resource Supervisor
Revenues:
Miscellaneous Revenue 119,435
Total School Resource Supervisor Revenue 119,435
Total Expenditures 119,435
Event Security
Revenues:
Edgefield County School District 31,600
Total School Resource Officer #5 Revenues
Total School Resource Officer #6 Revenues
Total Event Security Revenues 31,600
Total Expenditures 31,600
Sheriff Discretionary Fund
Revenues:
Discretionary Funds 11,700
Other 500
Sheriff's Child Support 3,000
Stimulus/Discretionary Funds 1,000
Unrestricted Reserves -
Federal Detention Reimbursement 100,000
Total Sheriff Discretionary Revenues 116,200
Total Expenditures 116,200
Clerk of Court Discretionary Funds
Revenues:
Fund Transfer Income 13,412
Discretionary Funds 3,552
Special Account 43,544
Total Clerk of Court Discretionary Revenues 60,508
Total Expenditures 60,508
Pre Trial Intervention
Revenues:
11th Circuit Solicitor's Office 142,287
Total Pre Trial Intervention Revenues 142,287
Total Expenditures 142,287
Domestic Violence
Revenues:
Misc Income -
Total Criminal Domestic Violence Revenues -
Total Expenditures -
Opioid Settlement Grant
Revenues:
Grant 173,760
Total Opioid Grant Revenues 173,760
Total Expenditures 173,760
Fire Tax Fund
Revenues:
Tax Revenues -
Total Fire Tax Revenues -
Total Expenditures -
Grand Total Ancillary Funds 11,533,295
Appendix A: Capital Improvement Plan
Adopted this 2nd day of June 2026.
EDGEFIELD COUNTY COUNCIL
ATTEST: Dean Campbell, Chair
Aretha Eubanks, Clerk to Council
APPROVED AS TO FORM AND CONTENT:
Andrew Marine, County Attorney
Advertise First Budget reading 3/13/2026
First Budget Reading 4/14/2026
Advertise Public Hearing 4/4/2026
Public Hearing 5/5/2026
Second Budget Reading 5/5/2026
Advertise Third Budget Reading 5/7/2026
Third and Final Budget Reading 6/2/2026
Publicize adopted Budget in paper 6/5/2026
Section 9. If for any reason, a court of competent jurisdiction declares any sentence, clause or provision in this ordinance invalid such
determination shall not affect the remaining provisions thereof.
Section 10. This ordinance is effective July 1, 2026.
Section 6. All of the foregoing appropriations are maximum and conditional, and are subject to reduction by action of County Council in the
event that the county's revenues shall fail to meet the budgeted levels approved in this ordinance. Generally, the council authorizes
transfers among line items within a department unless restricted herein or elsewhere by ordinance or council authorizes transfers among
line items within a department unless restricted by ordinance or administrative directive. By majority vote of County Council, may affect
transfers from Council's contingency to organizational departments.
Section 7. In order to assure the proper expenditure of monies appropriated to outside agencies, the agencies receiving monies shall supply
annual financial statements to the County.
Section 8. In the event that the state reduces the funding for the salary supplement for any elected official below the funded level of the
previous year, the County will retroactively make up the difference for that elected official until such time in which the state restores the
supplement to its regular funding level.
Ordinance No. Adoption History
FY 2026-2035
10-YEAR
Capital Improvement Plan
Drafted by Staff: 11/17/2025
Recommended by Planning Commission:
Adopted by County Council:
10-Year Capital Improvement Plan Overview
The Capital Improvements Program (CIP) is a ten-year planning tool used to prioritize major new
capital investments made by the County . The CIP is updated annually and focuses primarily on
infrastructure and facility needs. On -going maintenance activities and smaller, routine capital
expenditures for vehicles and technology are generally not included in the CIP process, nor are
total projects costing less than $100,000.
A digital copy of the Capital Improvement Plan will be available for the public on the County
website. A paper copy will be made available for the public to view at two locations:
• Edgefield County Administration Office is located at 124 Courthouse Square, Edgefield,
SC, 29824.
• Edgefield County Building and Planning Office is located at 210 Penn St reet, Edgefield,
SC, 29824.
If a member of the public wishes to have the County prepare a copy for the ir own use, they may
ask at the two locations above, and a copy will be produced for a nominal fee.
Funding
The CIP identifies a variety of possible funding sources , ranging from operating budgets to state
and federal grants to future bond programs. Only the first year of each CIP cycle is adopted as part
of the fiscal year's budget process; the nine subsequent years are planning years. The CIP is a long-
range plan that should be reviewed comprehensively and strategically.
CIP projects, due to their size and scope, may require the issuance of bonds – revenue bonds,
general obligation bonds, or certificates of obligation.
General Fund projects are supported by property and sales taxes. They typically include
improvements to parks, facilities, and equipment. Some projects, especially recreation projects,
are usually accomplished through outside grants with limited participation from County Gener al
funds.
Appropriation and Grant projects are projects supported by State appropriations and State and
Federal Grants. The State may appropriate funds for any project it deems fit. If funds are
appropriated for a project, this CIP must be updated to reflect the additional funds. Grants are
typically competitive, and the County will generally apply for any Grant for which a project is
eligible. If a grant is awarded for a project, this CIP must be updated to reflect the additional funds.
Utility Fund projects include water, wastewater, and electric utilities. They are generally funded
through revenues specifically generated by those utility systems.
Some projects are identified as eligible for Impact Fee funding. Impact fees are a mechanism for
funding public infrastructure necessitated by new development. I mpact fees are collected from
developers before issuing permits for new construction to recover the incremental cost of new
infrastructure attributable to each new unit of development. Before Impact fees can be set, an
impact fee study and an impact fee ordinance must be adopted by the County Council. Impact fees
can be a percentage of the total impact, provided they are directly contributed to new development.
For example, if we use impact fees to help fund an expansion of EMS service, the impact fee
cannot pay for 100% of the expansion unless the funds are dedicated to serving only those who
paid the fee. Instead, you have to determine the percentage of usage by the new development and
apply an impact fee to cover that cost (e.g., if new development accounts for 20% of the call
volume, the impact fee can cover 20% of the expansion cost).
Guidelines
Some guidelines as to how CIP funds operate include:
• CIP funds cannot be spent until the County Council appropriates them.
• County Council adopts the CIP annually; typically, adoption occurs concurrently with the
budget of each year.
• CIP project budgets are multi-year, and their appropriations may carry over from fiscal year
to fiscal year.
• The existing unused CIP funds can generate interest income. This income is recorded as
revenue to the fund and increases the fund's overall balance.
• The Council must appropriate the interest earned for expenditure.
• On-going maintenance activities and routine capital expenditures are not eligible for CIP
funding.
• Projects totaling less than $100,000.00 are not eligible for CIP funding.
Rankings
The CIP includes project rankings as a tool to help identify required projects versus those that can
be delayed if funding is not available. The ranking criteria are evaluated annually and revised as
needed. Currently a project ranking varies from 0 to 10. For a project to be listed in the CIP, it must
have a ranking of 6 or higher. Projects that rank five or lower are placed on a waiting list and re-
evaluated each year to determine whether they warrant a different ranking.
Questions Title Points Criteria
· CIP funds cannot be spent until the County Council appropriates them.
1 Mandated 10 Does this project have a state or federal mandate? · County Council adopts the CIP annually; typically, adoption occurs concurrently with the budget of each year.
2 External Project 10
Is the led by an external entity (ECWSA or SCDOT) and it
requires County funds? · CIP project budgets are multi-year, and their appropriations may carry over from fiscal year to fiscal year.
3 Grant Approved 10
If Grant amount approved is 50% or Project total or greater
than $1M=10, if lower = 0, see question 8. · The existing unused CIP funds can generate interest income. This income is recorded as revenue to the fund and increases the fund's overall balance.
4 Council Direction 10 Is projected directed by County Council to move forward? · The Council must appropriate the interest earned for expenditure.
· On-going maintenance activities and routine capital expenditures are not eligible for CIP funding.
5 Life Cycle 8
Does the project replace something that is at the end of
it's useful life? · Projects totaling less than $100,000.00 are not eligible for CIP funding.
6 Operational Necessity 5 Is this project necessary for continued operations?
7 Comprehensive Plan / Strategic Plan 2
Is this project inlcuded in the comprehensive plan or
strategic plan?
8 Grant Funding 1 Has a grant or a grant will be applied for = 1, No grant = 0
9 Project Underway 1
Does this project have previously appropriated funds
allocated to it or have funds allready been spent on it?
CIP Ranking Criteria
If the answer is YES to (1 or more) Qestions 1-4, the project gets an automatic 10 and there is no need to answer 5-9.
If the answer is YES to Question 5, the project gets an automatic 8 and there is no need to answer questions 6-11.
If the answer is NO to Questions 1-5, continue to questions 6-9 and the project score is the total of these points.
Some guidelines as to how CIP funds operate include:
Category Project Name Project Description Total Rank Funding Sources Anticipated Cost Previously Funded 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
EMS Headquarters
A new EMS headquarters is necessary for the expansion of EMS services in
Edgefield County. This project has been identified and directed by County
Council.
10 General Fund (Debt Serv),
Potential Bond Funds 5,000,000.00 557,960.00$ 557,960.00$ 557,960.00$ 557,960.00$ 557,960.00$ 557,960.00$ 557,960.00$ 557,960.00$ 536,320.00$
Multi Dept Sub-Station An EMS and Sheriff substation in the Merriwether area. 7 General Fund, Impact
Fees 1,000,000.00
Recreation Star Park A new park located on the LEC property.
10 General Fund, Grants,
Appropriations 2,300,000.00
$750,000 appropriation,
$550,000 general fund,
$500,000.00
Grant
$250,000 general
fund, $250,000
Grant
Coroner Morgue New mortuary regrigerators.
8
Potential Grants,
Appropriations, General
Fund 250,000 No current funding
EMS Ambulance Stationed in Merriwether substation 8 Special Rev Acct, Impact
Fees 400,000
Recreation Unkown Softball Field Complex 8 General Fund, Grants,
Appropriations 2,000,000
Recreation
Windsor or
Meriwether
Recreation Trail and Park amenities
6 Grants, Impact Fees,
Appropriations 500,000
Recreation Sweatwater Park Additional Courts 6 Grants, Impact Fees,
Appropriations 150,000
* Potential Bond Projects
* Impact Fee Eligible Projects
FY 2026-2035 10 YEAR CIP PROJECT LIST
ORDINANCE NO. 25-26-009
AN ORDINANCE OF EDGEFIELD COUNTY, SOUTH CAROLINA, AMENDING
CHAPTER 24 OF THE EDGEFIELD COUNTY CODE OF ORDINANCES TO ESTABLISH
CONDITIONAL USE REGULATIONS FOR DATA CENTERS, DATA CENTER
CAMPUSES, AND CRYPTO MINING CENTERS IN INDUSTRIAL ZONED AREAS, AND
FOR OTHER PURPOSES.
WHEREAS, Edgefield County, South Carolina, recognizes the technological and economic
significance of data centers, data center campuses, and crypto mining centers; and
WHEREAS, the County Council desires to regulate the location, design, operation, and
decommissioning of such facilities to protect the public health, safety, and welfare, and to ensure
compatibility with neighboring uses; and
WHEREAS, the County Council finds it necessary to amend Chapter 24 of the Edgefield County
Code of Ordinances to accomplish these goals;
NOW, THEREFORE, BE IT ORDAINED BY THE EDGEFIELD COUNTY COUNCIL:
SECTION 1. Amendment to Section 24-31 (Land Use Table)
Section 24-31 (Land Use Table) is hereby amended to add “data centers,” “data center
campuses,” and “crypto mining centers” as conditional uses permitted only in ID (Industrial)
zoned areas, subject to the regulations herein.
SECTION 2. Adoption of Conditional Use Regulations
A. The Edgefield County Code of Ordinances, Chapter 24, is hereby amended to include the
attached “Conditional Use Regulations for Data Centers, Data Center Campuses, and Crypto
Mining Centers,” including definitions, location restrictions, operational requirements,
application requirements, generator maintenance, and decommissioning standards, as set forth in
Exhibit ____ , attached hereto and incorporated herein by reference.
B. These regulations shall apply in addition to any other provisions of the Edgefield County
zoning code and shall control in the event of conflict.
SECTION 3. Pending Ordinance Doctrine
Under the pending ordinance doctrine, the provisions of this ordinance shall become effective
and enforceable immediately following advertisement for the public hearing, and shall remain in
effect unless and until the County Council determines otherwise.
SECTION 4. Severability
If any provision of this ordinance or the application thereof is found to be invalid or
unenforceable, such invalidity shall not affect other provisions or applications of this ordinance
that can be given effect without the invalid provision or application, and to this end the
provisions of this ordinance are declared to be severable.
SECTION 5. Effective Date
This ordinance shall take effect upon final reading and adoption by the Edgefield County
Council.
DONE, RATIFIED, AND ADOPTED this _____ day of ____________, 2026.
Chairman, Edgefield County Council
__________________________
ATTEST:
Clerk to Council
__________________________
EXHIBIT
Conditional Use Regulations for Data Centers, Data Center Campuses, and Crypto Mining
Centers (attached)
First Reading: May 5, 2026
Second Reading: June 2, 2026
Public Hearing: June 2, 2026
Third Reading:
Exhibit A
Proposed Data and Crypto Mining Center -Draft
Recommended to first amend Section 24-31 (Land Use Table) to allow data centers, data center
campuses, and crypt mining centers in ID(Industrial) zoned areas of Edgefield County and subject
to certain conditional regulations.
Potential Conditional Use Regulations to be added to Chapter 24 in addition to being
restricted to Industrial areas only.
Defined Terms of Edgefield County
Closed loop system: A system that constantly reuses and recycles an initial load of water within
its operation, significantly reducing the draw on external water sources and minimizing wastewater
discharge. A closed loop system shall not use evaporative cooling, and may consist of methods
including, but not limited to, air-cooled (dry) cooling, rear door heat exchanger cooling, hybrid dry
economizer cooling, direct-to-chip cooling, or immersion cooling.
Data center: A physical room, building, or facility that houses infrastructure for building, running,
delivering, or transmitting technological applications and services, or for storing and managing the
data associated with those technological equipment, applications, or services.
Data Center, Campus: A data center campus shall include a singular development that has more
than one (1) data center with a total development area of a minimum of 500,000 square feet.
Load: The total power consumed by servers, storage, cooling, ventilation, generators, and other
networking devices that operate within a data center site.
Megawatt (MW): The unit of measurement for electricity that is equivalent to one million watts.
This is used to measure the total power consumption of data centers.
Substations: An electric system facility that converts higher voltages to lower voltages within or
separate from a data center to generate sufficient power at maximum efficiency; can operate
independently for a dedicated site once directly connected to a transmission line.
Square footage, data centers: The square footage of a data center shall include the total square
footage of each floor in the data center development, the square footage of any supporting uses,
and the square footage of any additional exterior equipment, such as substations, electrical yards,
mechanical yards, and any other exposed equipment, located within property boundaries
Crypto Mining A crypto mining center (or farm) is a specialized, industrial-scale facility containing
a large number of high-powered computers—usually Application-Specific Integrated Circuits
(ASICs) or powerful GPUs—dedicated solely to validating blockchain transactions and generating
new cryptocurrency units, such as Bitcoin. These centers operate 24/7, requiring significant,
constant electricity for processing and intense cooling systems. Its purpose is primarily to solve
complex cryptographic algorithms (Proof of Work) to earn cryptocurrency rewards.
A. Permitted location
1. Data centers, data center campuses, and crypto mining centers shall only be
permitted in ID (Industrial Zoned) areas and shall be specifically forbidden in un-
zoned portions of the unincorporated areas of the County.
2. No Data Center shall be permitted within 1000 feet of a single or multi-family
residence.
3. Distance shall be measured from the edge of any building, substation, drive, street,
parking lot, structure or improvement to the nearest property line.
B. Operation requirements.
1. Substations, electrical yards, mechanical yards, and any other exposed equipment
shall not be located between the building and a publicly accessible road or right-of-
way and shall be screened from any adjacent publicly accessible street, private
street, trail, or park.
2. All lighting other than street and pedestrian scale lighting shall have “Dark Sky”
design. There shall be no spillover from the fixture onto surrounding properties,
including the street. All lights and poles shall have a permanent black finish.
3. All cooling and ventilation equipment within property boundaries shall operate on a
closed-loop system. This does not apply to the office portion of the center.
4. All cooling, ventilation, and other external equipment used to operate the facility
shall not be located between building and publicly accessible rights-of-way, unless
located on the rooftop of any data center development or building within property
boundaries.
5. Substations associated with the operation of a data center, data center campuses,
and crypto mining centers shall be subject to the following requirements:
a) The substation shall be at least fifty (50) feet from the public right-of-way.
Generator Maintenance requirements.
1. Any generators on the property shall comply with U.S. Environmental Protection
Agency (EPA) New Source Performance Standards (NSPS) of at least Tier 4 emission
standards.
a) Testing for these generators shall not exceed 10 hours per month.
b) Testing for these generators shall only occur between the hours of 9:00
a.m. and 5:00 p.m.
c) Generators shall be enclosed by a sound attenuation for noise reduction
and to reduce pollution.
2. Except for generator testing or commissioning activities, generator use is limited
to backup/emergency use only.
C. Application requirements.
1. All applications for a data center shall, in addition to any other application requirements
of this code, provide the following information:
a) Applicants shall provide a letter of intent from the relevant utility provider(s),
confirming that preliminary coordination has occurred and that service to the
proposed facility is technically feasible subject to final engineering review.
b) Noise Impact Assessment: A Noise Impact Assessment shall be required as part
of the permitting process for any proposed data center development and assessed
at a distance of 500 feet from the data center development. The Noise Impact
Assessment shall:
i. Define the scope of the assessment, including the geographic area, the
noise sources to be studied, and the specific objectives of the assessment
for the proposed development.
ii. Measure pre-operation ambient noise, or the existing background noise
before any server equipment is installed, and provide acoustic mitigation
strategies if noise level is proposed to exceed 60 dB during any hours of the
day or night once equipment for data center development is in operation.
c) Water Consumption and Sustainability Plan: A Water Consumption and
Sustainability Plan shall address conservation and scarcity, outlining the total water
requirement of the data center, including cooling needs, and any strategies to
reduce or mitigate excessive water usage. The plan shall demonstrate that the
water usage shall not significantly strain the County’s water supply, and that any
proposed improvements or alterations required for the construction will be paid for
by the applicant and will not affect the utility rates of the citizenry.
d) Energy Consumption and Sustainability Plan: An Energy Consumption
Sustainability Plan shall contain the estimated energy load before construction and
the daily operational load once constructed. This assessment shall outline:
i. Estimates of peak electricity demand and strategies for mitigating strain
on local power infrastructure
ii. Proposed improvements or alternatives to minimize the need for
additional transmission lines and the designated power provider
iii. Show that any proposed improvements or alterations to the power grid
caused by the construction will be paid for by the applicant and will not
affect the utility rates of the citizenry.
e. Transmission Line Impact Assessment: A Transmission Line Impact Assessment
shall identify the need for new or upgraded transmission lines to meet the data
center’s electricity requirements. This assessment shall include the potential
environmental impact on public land, including tree removal from county-owned
land and rights-of-way. This plan shall also include information on the planned
substation’s location and shall show the screening mechanism(s).
f. Before final approval by Edgefield County all stormwater and environmental
approvals from the South Carolina Department of Environmental Services will have
to be submitted to the Planning Director.
2. Additional Information: Any additional information requested by Edgefield County’s
Planning Department shall be submitted before the application is deemed complete.
3. The owner and/or operator is required to submit an annual compliance report that
details any changes to and continuation of all assessments submitted with an application
demonstrating compliance and monitoring of all applications requirements and conditions
of zoning to the County’s Planning Director no later than the first of January of each year.
4. The burden of showing compliance with supplemental requirements and/or conditions
of zoning is on the applicant and/or owner of the property or use.
A. Decommissioning
1. A decommissioning plan, in the event data infrastructure is not sold or transferred,
shall include provisions for recycling all on-site electronic infrastructure through certified
recyclers that adhere to the Responsible Recycling (R2) Standard for Electronics Recyclers
and/or the e-Stewards® Standard for Responsible Recycling and Reuse of Electronic
Equipment. An approved decommissioning plan shall be provided to the Edgefield County
Planning Director for county records. Upon the decommissioning of a Data or Crypto Mining
Center, a detailed, documented approval from any and all applicable regulatory authorities
shall be submitted to the Planning Director for review and record.
2. As part of the decommissioning plan, the owner or operator shall establish and
maintain a financial security—such as a surety bond, irrevocable letter of credit, or other
form of financial assurance acceptable to the County—in an amount sufficient to cover the
full cost of decommissioning and site restoration. This financial security shall be approved
by the County and remain in effect until all decommissioning activities have been
completed to the satisfaction of the Edgefield County Planning Director and all applicable
regulatory authorities.
ORDINANCE NO. 25-26-010
AN ORDINANCE OF THE EDGEFIELD COUNTY COUNCIL TO ACCEPT AND
IMPLEMENT THE EDGEFIELD COUNTY IMPACT FEE STUDY
WHEREAS, Edgefield County has commissioned an Impact Fee Study to evaluate the need for
and appropriate level of impact fees to fund public facilities and infrastructure necessitated by
new development;
WHEREAS, the Impact Fee Study has been completed and presented to the County Council for
review; and
WHEREAS, the County Council finds that the Impact Fee Study is a comprehensive and
necessary tool to guide future impact fee assessments consistent with state law and county
planning goals;
NOW, THEREFORE, BE IT ORDAINED BY THE COUNTY COUNCIL OF EDGEFIELD
COUNTY, SOUTH CAROLINA:
Section 1. Acceptance of Impact Fee Study. The Edgefield County Council hereby accepts the
Impact Fee Study dated May 14
th, 2026, attached hereto and incorporated herein by reference.
Section 2. Implementation. The County Administrator and appropriate county staff are
authorized and directed to utilize the findings and recommendations contained within the Impact
Fee Study to inform county policies, ordinances, and impact fee assessments moving forward.
Section 3. Effective Date. This ordinance shall take effect immediately upon adoption.
DONE AND ENACTED this ____ day of ______ , 2026, by the Edgefield County Council.
___________________________________________________
Dean Campbell Chairman, Edgefield County Council Chairman
ATTEST:
__________________________________________
Aretha Eubanks, Edgefield County Clerk to Council
EXHIBIT A: Impact Fee Study
First Reading: June 2, 2026
Second Reading:
Public Hearing:
Third Reading:
ORDINANCE NO. 25-26-011
AN ORDINANCE AUTHORIZING THE ISSUANCE AND SALE OF GENERAL
OBLIGATION BONDS, SERIES 2026 OR SUCH OTHER APPROPRIATE SERIES
DESIGNATION, OF EDGEFIELD COUNTY, SOUTH CAROLINA, IN THE PRINCIPAL
AMOUNT OF NOT EXCEEDING $6,250,000; FIXING THE FORM AND DETAILS OF
THE BONDS; AUTHORIZING THE COUNTY ADMINISTRATOR TO PRESCRIBE
CERTAIN DETAILS RELATING TO THE BONDS; PROVIDING FOR THE PAYMENT
OF THE BONDS AND THE DISPOSITION OF THE PROCEEDS THEREOF; AND
OTHER MATTERS RELATING THERETO.
BE IT ORDAINED BY THE COUNTY COUNCIL OF EDGEFIELD COUNTY, SOUTH
CAROLINA, AS FOLLOWS:
SECTION 1. Findings and Determinations. The County Council (the “County Council”), of Edgefield
County, South Carolina (the “County”), hereby finds and determines:
(a) Pursuant to Section 4-9-10, Code of Laws of South Carolina 1976, as amended (the “S. C.
Code”), and the results of a referendum held in accordance therewith, the Council -Administrator form of
government was adopted and the County Council constitutes the governing body of the County.
(b) Article X, Section 14 of the Constitution of the State of South Carolina, 1895, as amended
(the “Constitution”), provides that each county shall have the power to incur bonded indebtedness in such
manner and upon such terms and conditions as the General Assembly shall prescribe by general law. Such
debt must be incurred for a public purpose and a corporate purpose in an amount not exceeding eight percent
(8%) of the assessed value of all taxable property of such county.
(c) Pursuant to Title 4, Chapter 15 of the S. C. Code (the same being and hereinafter referred to
as the “County Bond Act”), the governing bodies of the several counties of the State of South Carolina (the
“State”) may each issue general obligation bonds to defray the cost of any authorized purpose and for any
amount not exceeding its applicable constitutional limit.
(d) The County Bond Act provides that as a condition precedent to the issuance of bonds an
election be held and the result be favorable thereto. Title 11, Chapter 27 of the S. C. Code provides that if an
election be prescribed by the provisions of the County Bond Act, but not be required by the provisions of
Article X of the Constitution, then in every such instance, no election need be held (notwithstanding the
requirement therefor) and the remaining provisions of the County Bond Act shall constitute a full and complete
authorization to issue bonds in accordance with such remaining provisions.
(e) The assessed value of all the taxable property in the County as of June 30, 2025, is
$116,610,560. Eight percent (8%) of the assessed value is $9,328,844. As of the date hereof, the outstanding
general obligation debt of the County subject to the limita tion imposed by Article X, Section 14(7) of the
Constitution is $643,451.37. Thus, the County may incur not exceeding $8,685,392 of additional general
obligation debt within its applicable debt limitation.
(f) It is necessary and in the best interest of the County for the County Council to provide for the
issuance and sale of general obligation bonds in an amount of not exceeding $6,250,000, the proceeds of which
will be used for: (i) funding capital projects approved by County Council including but not limited to County
building renovations, land purchase, and EMS main station construction (the “Projects”); (ii) paying costs of
issuance of the Bonds (hereinafter defined); and (iii) such other lawful purposes as the County Council shall
determine.
SECTION 2. Authorization and Details of Bonds . Pursuant to the aforesaid provisions of the
Constitution and laws of the State, there is hereby authorized to be issued not exceeding $6,250,000
aggregate principal amount of general obligation bonds (the “Bonds”) of the County, for the purposes set
forth in Section 1(f) and other costs incidental thereto, including without limiting the generality of such
other costs, engineering, financial and legal fees.
The Bonds shall be issued as fully registered bonds registrable as to principal and interest; shall be
dated their date of delivery to the initial purchaser(s) thereof; shall be in denominations of $5,000 or any
integral multiple thereof not exceeding the principal amount of Bonds maturing each year; shall be subject
to redemption if such provision is in the best interest of the County; shall be numbered from R -1 upward;
shall bear interest from their date payable at such times as hereinafter designated by the County
Administrator and/or his lawfully-authorized designee (the “County Administrator”) at such rate or rates as
may be determined at the time of the sale thereof; and shall mature serially in successive annual installments
as determined by the County Administrator.
SECTION 3 . Delegation of Authority to Determine Certain Matters Relating to the Bonds .
Without further authorization, the County Council hereby delegates to the County Administrator the
authority to determine: (a) the par amount of the Bonds; (b) the maturity dates of the Bonds and the
respective principal amounts maturing on such dates; (c) the interest payment dates of the Bonds; (d)
redemption provisions, if any, for the Bonds; (e) the date and time of sale of the Bonds; (f) whether the
Bonds will be publicly traded or placed with a bank; and (g) the authority to receive bids on behalf of the
County Council and to award the sale of the Bonds in accordance with the terms of the Notice of Sale or
Request for Proposals for the Bonds.
After the sale of the Bonds, the County Administrator shall submit a written report to County
Council setting forth the details of the Bonds as set forth in this paragraph.
SECTION 4. Registration, Transfer and Exchange of Bonds. The County shall cause books (herein
referred to as the “registry books”) to be kept at the offices of the Registrar/Paying Agent, for the
registration and transfer of the Bonds. Upon presentation at its office for such purpose the Registrar/Paying
Agent shall register or transfer, or cause to be registered or transferred, on such registry books, the Bonds
under such reasonable regulations as the Registrar/Paying Agent may prescribe.
Each Bond shall be transferable only upon the registry books of the County, which shall be kept
for such purpose at the principal office of the Registrar/Paying Agent, by the registered owner thereof in
person or by his duly authorized attorney upon surre nder thereof together with a written instrument of
transfer satisfactory to the Registrar/Paying Agent duly executed by the registered owner or his duly
authorized attorney. Upon the transfer of any such Bond the Registrar/Paying Agent on behalf of the
County shall issue in the name of the transferee a new fully registered Bond or Bonds, of the same aggregate
principal amount, interest rate, and maturity as the surrendered Bond. Any Bond surrendered in exchange
for a new registered Bond pursuant to this Section shall be canceled by the Registrar/Paying Agent.
The County and the Registrar/Paying Agent may deem or treat the person in whose name any fully
registered Bond shall be registered upon the registry books as the absolute owner of such Bond, whether
such Bond shall be overdue or not, for the purpose of receiving payment of the principal of and interest on
such Bond and for all other purposes and all such payments so made to any such registered owner or upon
his order shall be valid and effectual to satisfy and discharge the liability upon such Bond to the extent of
the sum or sums so paid, and neither the County nor the Registrar/Paying Agent shall be affected by any
notice to the contrary. In all cases in which the privilege of transferring Bonds is exercised, the County
shall execute and the Registrar/Paying Agent shall authenticate and deliver Bonds in accordance with the
provisions of this Ordinance. Neither the County nor the Registrar/Paying Agent shall be obliged to make
any such transfer of Bonds during the fifteen (15) days preceding an interest payment date on such Bonds.
SECTION 5. Record Date. The County hereby establishes a record date for the payment of interest
or for the giving of notice of any proposed redemption of Bonds, and such record date shall be the fifteenth
(15th) day (whether or not a business day) preceding an interest payment date on such Bond or in the case
of any proposed redemption of Bonds, such record date shall be the fifteenth (15th) day (whether or not a
business day) prior to the giving of notice of redemption of bonds.
SECTION 6. Mutilation, Loss, Theft or Destruction of Bonds. In case any Bond shall at any time
become mutilated in whole or in part, or be lost, stolen or destroyed, or be so defaced as to impair the value
thereof to the owner, the County shall execute and the Registrar shall authenticate and deliver at the
principal office of the Registrar, or send by registered mail to the owner thereof at his request, risk and
expense a new Bond of the same series, interest rate and maturity and of like tenor and effect in exchang e
or substitution for and upon the surrender for cancellation of such defaced, mutilated or partly destroyed
Bond, or in lieu of or in substitution for such lost, stolen or destroyed Bond. In any such event the applicant
for the issuance of a substitute B ond shall furnish the County and the Registrar evidence or proof
satisfactory to the County and the Registrar of the loss, destruction, mutilation, defacement or theft of the
original Bond, and of the ownership thereof, and also such security and indemnity in an amount as may be
required by the laws of the State or such greater amount as may be required by the County and the Registrar.
Any duplicate Bond issued under the provisions of this Section in exchange and substitution for any
defaced, mutilated or partly destroyed Bond or in substitution for any allegedly lost, stolen or wholly
destroyed Bond shall be entitled to the identical benefits under this Ordinance as was the original Bond in
lieu of which such duplicate Bond is issued, and shall be entitled to equal and proportionate benefits with
all the other Bonds of the same series issued hereunder.
All expenses necessary for the providing of any duplicate Bond shall be borne by the applicant
therefor.
SECTION 7. Execution of Bonds. The Bonds shall be executed in the name of the County with
the manual or facsimile signature of the Chair of the County Council attested by the manual or facsimile
signature of the Clerk to the County Council under the seal of the County impressed, impr inted or
reproduced thereon; provided, however, the facsimile signatures appearing on the Bonds may be those of
the officers who are not in office on the date of enactment of this Ordinance. The execution of the Bonds
in such fashion shall be valid and effectual, notwithstanding any subsequent change in such offices. The
Bonds shall not be valid or become obligatory for any purpose unless there shall have been endorsed thereon
a certificate of authentication. Each Bond shal l bear a certificate of authentication manually executed by
the Registrar in substantially the form set forth herein.
SECTION 8 . Form of Bonds . The Bonds and the certificate of authentication shall be in
substantially the form set forth in Exhibit A attached hereto.
SECTION 9. Security for Bonds. The full faith, credit, resources and taxing power of the County
are hereby irrevocably pledged for the payment of the principal of and interest on the Bonds as they
respectively mature, and for the creation of such sinking fund as may be necessary therefor. There shall be
levied annually by the Edgefield County Auditor (the “County Auditor”) and collected by the Edgefield
County Treasurer (the “County Treasurer”), in the same manner as other county taxes are levied and
collected, a tax, without limit, on all taxable property in the County sufficient to pay the princi pal of and
interest on the Bonds as they respectively mature and to create such sinking fund as may be necessary
therefor.
The County Council shall give the County Auditor and County Treasurer written notice of the
delivery of and payment for the Bonds and they are hereby directed to levy and collect annually, on all
taxable property in the County, a tax, without limit, suffi cient to pay the principal of and interest on the
Bonds as they respectively mature and to create such sinking fund as may be necessary therefor.
SECTION 10. Notice of Public Hearing. The County Council hereby ratifies and approves the
publication of a notice of public hearing regarding the Bonds and this Ordinance, such notice in
substantially the form attached hereto as Exhibit B, having been published in The Edgefield Advertiser, a
newspaper of general circulation in the County, not less than 15 days prior to the date of such public hearing.
SECTION 11. Initiative and Referendum . The County Council hereby delegates to the County
Administrator the authority to determine whether the Notice prescribed under the provisions of Section 5
of Title 11, Chapter 27 of the S. C. Code relating to the initiative and referendum provisions con tained in
Title 4, Chapter 9, Article 13 of the S. C. Code shall be given with respect to this Ordinance. If said Notice
is given, the County Administrator is authorized to cause such Notice to be published in The Edgefield
Advertiser, a newspaper of general circulation in the County, in substantially the form attached hereto as
Exhibit C.
SECTION 12. Exemption from State Taxes. Both the principal of and interest on the Bonds shall
be exempt, in accordance with the provisions of Section 12-2-50 of the S. C. Code from all State, County,
municipal, school district and all other taxes or assessments, except estate or other transfer taxes, direct or
indirect, general or special, whether imposed for the purpose of general revenue or otherwise.
SECTION 13. Reimbursement of Certain Expenditures . This Ordinance shall constitute the
County’s declaration of official intent pursuant to Regulation §1.150- 2 of the Internal Code of 1986, as
amended (the “Code”), to reimburse the County from a portion of the proceeds of the Bonds for
expenditures it anticipates incurring (the “Expenditures”) with respect to the Projects prior to the issuance
of the Bonds. The Expenditures which are reimbursed are limited to Expenditures which are: (1) properly
chargeable to a capital account (or would be so chargeable with a proper election or with the application of
the definition of placed in service under Regulation §1.150- 2 of the Code) under general federal income
tax principals; or (2) certain de minimis or prelimi nary Expenditures satisfying the requirements of
Regulation §1.150-2(f) of the Code. The source of funds for the Expenditures with respect to the Project
will be the County’s reserve funds or other legally available funds. To be eligible for reimbursement of the
Expenditures, the reimbursement allocation must be made not later than 18 months after the later of (a) the
date on which the Expenditures were paid; or (b) the date such projects were placed in service, but in no
event more than three (3) years after the original Expenditures.
SECTION 14. Federal Tax Covenants. The County hereby covenants and agrees with the holders
of the Bonds that it will not take any action which will, or fail to take any action which failure will, cause
interest on the Bonds to become includable in the gross income of the holders of the B onds for federal
income tax purposes pursuant to the provisions of the Code and regulations promulgated thereunder in
effect on the date of original issuance of the Bonds. The County further covenants and agrees with the
holders of the Bonds that no use of the proceeds of the Bonds shall be made which, if such use had been
reasonably expected on the date of issue of the Bonds would have caused the Bonds to be “arbitrage bonds,”
as defined in Section 148 of the Code, and to that end the County hereby shall:
(a) comply with the applicable provisions of Sections 103 and 141 through 150 of the
Code and any regulations promulgated thereunder so long as the Bonds are outstanding;
(b) establish such funds, make such calculations and pay such amounts, in the manner
and at the times required in order to comply with the requirements of the Code relating to required rebates
of certain amounts to the United States; and
(c) make such reports of such information at the time and places required by the Code.
SECTION 15. Book-Entry System. The Bonds initially issued (the “Initial Bonds”) will be eligible
securities for the purposes of the book- entry system of transfer maintained by The Depository Trust
Company (“DTC”), and transfers of beneficial ownership of the Initial Bonds shall be ma de only through
DTC and its participants in accordance with rules specified by DTC. Such beneficial ownership must be
of $5,000 principal amount of Bonds of the same maturity or any integral multiple of $5,000.
The Initial Bonds shall be issued in fully- registered form, one Bond for each of the maturities of
the Bonds, in the name of Cede & Co., as the nominee of DTC. When any principal of or interest on the
Initial Bonds becomes due, the Paying Agent, on behal f of the County, shall transmit to DTC an amount
equal to such installment of principal and interest. DTC shall remit such payments to the beneficial owners
of the Bonds or their nominees in accordance with its rules and regulations.
Notices of redemption of the Initial Bonds or any portion thereof shall be sent to DTC in accordance
with the provisions of the Ordinance.
If (a) DTC determines not to continue to act as securities depository for the Bonds, or (b) the County
has advised DTC of its determination that DTC is incapable of discharging its duties, the County shall
attempt to retain another qualified securities de pository to replace DTC. Upon receipt by the County the
Initial Bonds together with an assignment duly executed by DTC, the County shall execute and deliver to
the successor securities depository Bonds of the same principal amount, interest rate, and matu rity
registered in the name of such successor.
If the County is unable to retain a qualified successor to DTC or the County has determined that it
is in its best interest not to continue the book -entry system of transfer or that interests of the beneficial
owners of the Bonds might be adversely affect ed if the book- entry system of transfer is continued (the
County undertakes no obligation to make any investigation to determine the occurrence of any events that
would permit it to make any such determination), and has made provision to so notify beneficial owners of
the Bonds by mailing an appropriate notice to DTC, upon receipt by the County the Initial Bonds together
with an assignment duly executed by DTC, the County shall execute, authenticate and deliver to the DTC
participants Bonds in fully-registered form, in substantially the form set forth in Section 8 of this Ordinance
in the denomination of $5,000 or any integral multiple thereof.
Notwithstanding the foregoing, at the request of the purchaser, the Bonds will be issued as one
single fully-registered bond and not issued through the book-entry system.
SECTION 16. Sale of Bonds, Form of Notice of Sale. The Bonds shall be offered for public sale
on the date and at the time designated by the County Administrator. A Notice of Sale in substantially the
form set forth as Exhibit D attached hereto shall be distributed to prospective bidders and a summary of
such Notice of Sale shall be published in a newspaper of general circulation in the State and/or in a financial
publication published in the City of New York not less than seven (7) days prior to the date set for such
sale.
SECTION 17. Preliminary and Final Official Statement. The County Council hereby authorizes
and directs the County Administrator to prepare, or cause to be prepared, a Preliminary Official Statement
to be distributed to prospective purchasers of the Bonds together with the Notice of Sale. The County
Council authorizes the County Administrator to designate the Preliminary Official Statement as “final” for
purposes of Rule 15c2-12 promulgated by the U.S. Securities and Exchange Commission (the “Rule”). The
County Administrator is further authorized to see to the completion of the final form of the Official
Statement upon the sale of the Bonds so that it may be provided to the purchaser of the Bonds.
SECTION 18. Filings with Central Repository. In compliance with Section 11 -1-85 of the S. C.
Code, the County covenants that it will file or cause to be filed with a central repository for availability in
the secondary bond market when requested: (a) a copy of the annual financial report of the County within
thirty (30) days from the County’s receipt thereof; and (b) within thirty (30) days of the occurrence thereof,
relevant information of an event which adversely affects more than five (5%) percent of the revenues of the
County or the County’s tax base.
SECTION 19. Continuing Disclosure . In compliance with the Rule, the County covenants and
agrees for the benefit of the holders from time to time of the Bonds to execute and deliver prior to closing,
and to thereafter comply with the terms of a Continuing Disclosure Certificate in substan tially the form
appearing as Exhibit E attached to this Ordinance. In the event of a failure of the County to comply with
any of the provisions of the Continuing Disclosure Certificate, an event of default under this Ord inance
shall not be deemed to have occurred. In such event, the sole remedy of any bondholder or beneficial owner
shall be an action to compel performance by this Ordinance.
SECTION 20. Bank Placement . In the event the Bonds are sold to a bank, the requirements of
Sections 15, 17 and 19 hereof shall not be applicable, and the County may serve as Registrar/Paying Agent
as described in Section 4 hereof. Also, forms of the attachments to this Ordinance will be revised as
necessary and appropriate.
SECTION 21. Deposit and Use of Proceeds. The proceeds derived from the sale of the Bonds
shall be deposited with the County Treasurer in a special fund and shall be applied solely to the purposes
for which the Bonds have been issued, including payment of costs of issuance of the Bonds.
SECTION 22. Defeasance. The obligations of the County under this Ordinance and the pledges,
covenants and agreements of the County herein made or provided for, shall be fully discharged and satisfied
as to any portion of the Bonds, and such Bond or Bonds shall no longer be dee med to be outstanding
hereunder when:
(a) such Bond or Bonds shall have been purchased by the County and surrendered to the
County for cancellation or otherwise surrendered to the County or the Paying Agent and is canceled or
subject to cancellation by the County or the Paying Agent; or
(b) payment of the principal of and interest on such Bonds either (i) shall have been made or
caused to be made in accordance with the terms thereof, or (ii) shall have been provided for by irrevocably
depositing with a corporate trustee in trust and irrevoca bly set aside exclusively for such payment, (1)
moneys sufficient to make such payment, or (2) Government Obligations (hereinafter defined) maturing as
to principal and interest in such amounts and at such times as will ensure the availability of suffi cient
moneys to make such payment and all necessary and proper fees, compensation and expenses of the Paying
Agent. At such time as the Bonds shall no longer be deemed to be outstanding hereunder, such Bonds shall
cease to draw interest from the due date thereof and, except for the purposes of any such payment from
such moneys or Government Obligations, shall no longer be secured by or entitled to the benefits of this
Ordinance.
“Government Obligations” shall mean any of the following:
(i) direct obligations of the United States of America or agencies thereof or
obligations, the payment of principal or interest on which, in the opinion
of the Attorney General of the United States, is fully and unconditionally
guaranteed by the United States of America;
(ii) non-callable, U. S. Treasury Securities - State and Local Government
Series (“SLGS”); and
(iii) a defeasance obligation as defined in Section 6-5-10 of the “S. C. Code, as
such may be amended from time to time.
(c) Such Bond or Bonds shall be defeased as provided in Section 11-14-110 of the S. C. Code
as such may be amended from time to time.
SECTION 23. Miscellaneous. The County Council hereby authorizes the Chair of the County
Council, the Clerk to the County Council, County Administrator, and County Attorney to execute such
documents and instruments as necessary to effect the issuance of the Bonds. The County Council hereby
retains Burr & Forman LLP, as Bond Counsel, Compass Municipal Advisors, LLC, as Financial Advisor
and AMTEC Corp., as Rebate Advisor, in connection with the issuance of the Bonds. The County
Administrator is authorized to execute such contracts, documents or engagement letters as may be necessary
and appropriate to effectuate these engagements.
[Remainder of page intentionally left blank]
All rules, regulations, Ordinances, and parts thereof, procedural or otherwise, in conflict herewith
or the proceedings authorizing the issuance of the Bonds are, to the extent of such conflict, hereby repealed
and this Ordinance shall take effect and be in full force from and after its adoption.
Enacted this ______ day of _____________, 2026.
EDGEFIELD COUNTY, SOUTH CAROLINA
By:
Chair, County Council
(SEAL)
ATTEST:
Clerk to County Council
Date of First Reading: June 2,, 2026
Publication of Notice of
Public Hearing: ____________, 2026
Date of Second Reading: __________, 2026
Date of Public Hearing: __________, 2026
Date of Third Reading: __________, 2026