RecordWell Data

Residential Home Packet Revised 2025

Edgefield County · Edgefield County · meeting of Jan 20, 2026 · Agenda packets

Open the original document More from Edgefield County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

EDGEFIELD COUNTY BUILDING & PLANNING 210 PENN ST. EDGEFIELD, SC 29824 (803) 637-4073 Building a Home in Edgefield County South Carolina Contacts: Edgefield County Building & Planning (803) 637 - 4073 mmathis@edgefieldcounty.sc.gov dwilliams@edgefieldcounty.sc.gov Edgefield County Tax Assessor (803) 637 - 4066 DRIVEWAYS: Edgefield County Road (803) 637 - 4073 S.C. Dept. of Transportation (State Road) (803) 637 - 6511 ELECTRIC COMPANIES: Aiken Electric Cooperative (803) 637 - 3189 Dominion Energy (800) 251 - 7234 WATER & SEWER: Department of Environment Services (803) 642 - 1637 Edgefield County Water & Sewer (803) 637 – 3011 Use this link to apply for building permits and request inspections. https://edgefield.portal.iworq.net/portalhome/edgefield Once you have made the decision to construct a home in Edgefield County, there are a few procedures that need to be followed. This booklet will attempt to guide you through these guidelines with minimum effort on the part of the homeowner. This book is NOT a building code manual or construction guide. PLAT APPROVAL The first step in building your home is to present a copy of the recorded plat of your property to the Building & Planning Department. If you do not have one, a copy may be obtained at the RMC Office (Records) in the Courthouse. Your plat will be reviewed by the Planner to determine if the property is suitable for the type of construction you are proposing. Items such as drainage, easements, set-backs, etc. will be checked for compliance with building codes and county ordinances. Once you have the plat approval, you will need to apply at the Department of Environmental Services (DES) for a septic tank permit or obtain authorization from the Edgefield County Water and Sewer Authority for water and/or sewer taps if applicable. BUILDING PERMIT Prior to any construction, you must first obtain a building permit from the Building Department. To obtain this permit, you will need the following: 1. Copy of septic permit to construct from the Department of Environmental Services or Water tap receipt from ECW&S if on county water 2. A digital copy of the plans can be downloaded to the portal 3. Completed building permit application online at http://edgefield.portal.iworq.net/portalhome/edgefield 4. A copy of contractors’ S.C. state license (Not required if homeowner is doing his own work; however, sub-contractors will need to be licensed.) 5. Payment of permit fee (determined after application & plan review). BUILDING PLANS Building plans must show the following: 1. Floor plan indicating exterior and interior walls. 2. Location of all electrical devices, panels, etc. 3. Location of plumbing fixtures. 4. Footing, foundation and wall details. 911 ADDRESS Once the permit is submitted, you will be given a 911 address IF BUILDING A HOME OR BUSINESS. This address MUST be posted visibly from the nearest public road at the beginning of every project; failure to do so could result in a failed inspection. Owner Builder Disclosure Statement Only required if the owner is building their own home, meaning no licensed contractor is pulling the building permit. This form will be notarized and recorded at the time of picking up the building permit. This form states that the owner is responsible for the work being done and will not rent, lease, or sell the building for a period of two years. Certificate of Occupancy Requirements: • A Passed CO Inspection • Termite Letter • Department of Environmental Services Permit to Operate (Final) • Manual J (the load calculations on the HVAC) • Duct Tightness Test • IECC (Air Barrier & Insulation Inspection Component Criteria) FARM STRUCTURE AFFIDAVIT Only the building receives no inspections and doesn’t require an Owner Builder/Disclosure Statement, but any electrical, mechanical or plumbing work shall be completed by SC licensed contractors and must get their permits and inspections. INSPECTIONS A series of inspections must be made on the project during construction. It is up to the permit holder to schedule these inspections by contacting the building department at least 24 hours in advance. The Building Department will make every effort to make inspections on the scheduled day. Results from inspections will be sent to the email that was used on the building permit application. The necessary inspections are conducted as follows: 1. Temporary power 2. Footing/Slab – when footing/slab is prepared, reinforcement, bulkheads, step-downs, etc. are in place. Rebar must make turns around corners in footings. 3. Foundation – when the foundation is complete, blocks grouted, anchors in place, vents as required, crawl space clean and graded. 4. Floor joist – prior to any wall and prior to any decking. 5. Rough-in – when home is framed; roofed; windows and doors in place; electrical, mechanical and plumbing in place; and Manual J calculations submitted to the Building & Planning Department. A leak test is required on plumbing (water and waste) at this time. 6. Insulation – when wall insulation and any other insulation that is to be covered by sheetrock is installed. 7. Final Electrical – when home is insulated; sheetrock is complete; all electrical devices in place or wire ends protected; smoke detectors installed; plumbing fixtures installed; decks, railings, and handrails installed; and drainage around the house installed. The completed septic tank approval and evidence of termite control must be submitted. If all these conditions are met, the Building Department will authorize power to the house. This authorization will be sent to the power company that supplies service to your home. 8. Certificate of Occupancy (CO) – This is the last inspection. The house should have everything complete inside and out, other than landscaping. This is a very important inspection in that if you finance your home, sell your home, or, in some cases, insure your home, you may be asked for the Certificate of Occupancy. To receive a Certificate of Occupancy, a copy of the IECC, Termite Letter, Duct Test, J Manual, Final Septic, and Disclosure Statement (if needed) must be submitted to the Building and Planning department. *YOU MAY OCCUPY HOME AFTER ISSUANCE OF CERTIFICATE OF OCCUPANCY. The Building Department will conduct any other inspections that you feel are needed. CORRECTIONS REQUIRED If any inspection reveals that corrections are required, the inspector will send the necessary corrections to the permit holder. The corrections will need to be performed before any other work continues. You must call for re-inspection! Reinspection fees will apply after second fail for same inspection will have to be paid before any more inspections are scheduled. It is important to know that just because you passed one of these inspections that everything may not be perfect. There may be additional corrections required if an inspector finds another problem during another inspection even if it pertains to one that has passed. Every effort is made for this not to happen, but just like corrections that are needed, sometimes things are missed. The contractor/owner is responsible to ensure that all codes are met. LICENSE AND PERMITS REQUIRED Contractor and subs must be licensed by the State of South Carolina and on file in the Building Department. Permits for all trades must be issued prior to any work being done. If you are a home owner, you may do your work, but a notarized disclosure statement must be recorded at the RMC Office in the Courthouse. Permits are required just the same. Permits are good for 180 days (6 months) from the time of issuance or from the time of inspection. You may extend the permit for an additional time of 180 days (6 months). The extension should be requested in writing and justifiable cause demonstrated. If you pull a permit and decide later to not continue with the project, the county WILL NOT refund any permit fees. If you are getting owner occupied at your home and doing work with no contractor, you will need to obtain an Owner/Builder Disclosure Statement which must be notarized and recorded before the final inspection is complete. CODES IN FORCE 2021 SC Building Code 2021 SC Residential Code 2021 SC Fire Code 2021 SC Plumbing Code 2021 SC Mechanical Code 2021 SC Fuel-Gas Code 2020 National Electric Code 2009 International Energy Conservation Code GENERAL NOTES 1. Use type “S” mortar mix on bearing foundation and piers. If you are using a pier foundation you need to discuss this with the Building Department. 2. Two rows of #4 rebar in footings are the minimum 3. 5.7 sq. ft. (820 sq. inches) glazing for egress in bedrooms above the ground floor. One window (5.0 sq. ft. at grade) per bedroom must meet egress for rescue. 4. Smoke detectors are required in all sleeping rooms, outside each separate sleeping area in the immediate vicinity of the bedrooms and all floors to include basements. Interconnect is required on new construction but not on existing construction. 5. Tempered glass over tubs and showers or any other area that meets the code requirements.

Source: Edgefield County website. First collected Oct 13, 2026.