RecordWell Data

Packett Templet_2026Jan8

Edgefield County · Edgefield County · meeting of Jan 2, 2026 · Agenda packets

Open the original document More from Edgefield County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Edgefield County Planning Commission County Council Chambers JANUARY 8, 2026 Work Session 5:00 PM Meeting 6:00 PM The next Planning Commission Meeting is scheduled for February 12, 2026 Edgefield County Planning Commission Work Session Agenda County Council Chambers January 8, 2026 5:00 PM This agenda may be modified at any time prior to or during the meeting described herein. The meeting may begin after the advertised start time if a reasonable adjustment to the advertised start time is needed for any reason. I. Call to Order II. Guest Speakers III. Old Business a) Staff Updates and Reports IV. New Business a) Discussion on the creation of ordinances to regulate Data Centers & Crypto Mining, proposed by Lisa Whitaker. b) Discussion on the creation of ordinances to regulate mass grading proposed by Tracy Walsh. V. Adjourn To watch the Planning Commission Work Session live: Subscribe to our YouTube Account – Edgefield County Government. You can be notified of upcoming live streams. The next Planning Commission Meeting is scheduled for February 12, 2025. The Planning Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a work session and at 6:00 p.m. for the meeting at the Edgefield County Council Chambers, located at 225 Jeter St., Edgefield, SC. These meetings are subject to cancellation or change without prior notice. The public will be notified of any cancellation or change. Individuals requiring special assistance or a sign interpreter to participate in the meeting are asked to notify the Building & Planning Department 48 hours before the meeting at (803) 637-4073. Any questions regarding the Planning Commission should be directed to the County’s Planner, April Morgan Amorgan@edgefieldcounty.sc.gov 3 Edgefield County Planning Commission Work Session Minutes County Council Chambers December 11, 2025 5:00 PM Dustin Doolittle was absent for the December 11, 2025, Meeting Staff Present: April Morgan, Hart Clark Burt: Good afternoon. Good to see everyone here today on this beautiful, sunshiny day. A little wind, but that's not bad. We're going to call our work session of the Edgefield County Planning Commission for December 11, 2025. We're going to call it to order this time. No guest speakers. No old business. New business is reviewing a zoning application; submit it for the podcast. 174-00-00-072-000, 174-00-00-071- 000, and 174-00-00-040-000 are located at Greenhouse Road in Trenton. And later, a part of new business is reviewing the 10 year plan. That's a part of a new business. But before we get to that, let's review the zoning application. Let's see what we have here. The proposed rezoning applicant is Victor Vann. Property size here, located in Trenton, is 54.64 acres, and one section is 14.49 acres, and the other is 0.48. Right now, you're a general commercial, and you want to change it to an industrial type. It's got water and sewer from the County, and so forth. Clark: All right, so if you want, I'll just give you all a brief overview of it. So it's these three parcels right here. This one, this little teeny tiny one, and then this big one. It is light industrial under the comp plan. They're asking for rezoning to industrial. Of course, yes, it does have and sewer and all that, but the biggest and most important part is it has a large high-pressure natural gas line on it. The intended purpose, which is not under today's discussion, if the rezoning goes through, they'll have to come back and do the actual development plan, but the batch plant on Highway 191, they want to move that to this location. Walsh: The what plant? Chairman: James Burt – Dist. I Members: Sharron Hadden – Dist. II Vice-Chairman: Lisa Whitaker-Dist. III Karlene Butler– Dist. IV At Large: Autumn Becker Dustin Doolittle- Dist. V At Large: Tracy Walsh 4 Clark: Batch plant. So, manufacturing road material. Burt: Like Satterfield? Clark: Yes, it's Satterfield. Yes. This this is a large acreage track and they intend to build in the center of it. I don't have exact plans or anything like that. And I'm sure that they can answer your questions, you know, regarding the development better. But as for the rezoning, they're looking to change it to industrial. Of course, there is a large industrial property right across the street that is Sarah's Farm Adventure. They have access to both US 25 and Greenhouse Road, which is important for stacking trucks and making sure that they're not interfering or causing traffic issues with, as y'all know, this little dot right here. Is Sara's Peach Stand, and when it gets going, it can get congested. So they have enough land that they can have outlets on Greenhouse Road so that they don't disrupt the traffic flows. It's right next to Costa Farms big industrial greenhouse. It's on the opposite side of the road. So it's directly across from where our recycling center on Greenhouse is. So our recycling center on the map is right there. Whitaker: Right. And so it's right across the road. Clark: Yes. Whitaker: OK. Clark: It'll be it'll be somewhere in here. Now if y'all have questions about you know what they intend to do and the size of it and all that I'll let them answer that. I don't have development details yet because we haven't got to the development application yet. But from a legal standpoint for the rezoning, there's no issues. There's no obligations. So that's the introduction to that item. And y'all can come up, and if you want, y'all can go ahead and come up and introduce yourselves. Sarton: We apologize. There was an accident on US 25. As I said earlier, it got people delayed a little bit. This is Meg. You want to introduce yourself? I'm Gene Sartin, the president of Satterfield Construction. Adams: I'm Meg Adams. I'm with Austin and Pethick. We represent Satterfield. Henderson: And I'm John Henderson. Sarton: And John's our manager. Henderson: Yeah, so we're looking to put an asphalt manufacturing facility here at this location, I think we're going to combine three parcels into one in order to not include the little building there that's on 25. So it'll be those three parcels combined into one, and those tax map is actually not correct. It does not go across those greenhouses in the back. Clark: But y'all already know that that's just an image that the satellite superimposed is on the tax map. Henderson: But we have had it surveyed, so we know it doesn't cut across those greenhouses. We are going to propose in the future plans to leave at least a 50 75 foot buffer all the way around the perimeter that will not be disturbed and as you can see it's pretty heavily wooded so our object is to be a good neighbor and be not heard or seen other than that, that is one of the reasons for locating is the natural gas availability in the quarry, proximity to the quarry. 5 Sarton: So we're a large supplier of aggregates from the quarry here in town. We're one of their largest customers. That puts us 3 miles, or 3.2 miles, to the site. Burt: Are you going to close the other site down? Sarton: Yes. And it's not going to be exactly what we're not just going to move that one, we're going to put in new equipment components. Clark: Yes well one of the biggest things that I remember in one of our phone conversations I think was your current plant works on a a diesel fuel type substance it's not actually diesel fuel I don't know the science of it but it's a diesel fuel like substance and by moving here they can get all of that and be on natural gas, which is much cleaner and less smelly and effluent producing, et cetera. Environmentally friendly. Henderson: Yes. That's a significant issue for us because we have to store a substantial amount of fuel now to run on it. I'll cut that back drastically. Whitaker: And that'll cut the traffic down the other way. Clark: Well, so I did discuss with them my concerns about Sara's, you know, when it's in full swing, it's a fairly busy area. So, I think they were willing to discuss having, you know, like a primary entrance over here in the greenhouse. That's not to say there can't be a secondary entrance somewhere over here, but having the ability to exit the greenhouse allows them to avoid the Saras. Butler: Well, maybe they could come in off of 205 and come out on the Greenhouse. Henderson: So, we'll have a traffic study done whenever we do our construction plans. However, our tentative schedule currently includes three entrances, as we need to address Saras in two different ways: one at Greenhouse when it's open, and then Saras the fruit stand on the other side. Our plan is to obtain permits for three driveways, allowing us to have different access points depending on the traffic flow. Sarton: Our plan is to be honest with you, and come out here in front of Sara's and put decel lanes in the center, which would be at our expense. So a turning lane, for example. If you've ever been coming from Augusta when Sarah's is in its busy season, and somebody's waiting to stop to turn left, it's really hazardous because they can run into each other. So, we would put in a turning lane out here on 25, which would relieve congestion and allow people to go around, especially those waiting to turn left or right from either direction. But I just can't make that promise. Because we don't know if we're allowed to do that yet because of the DOT right-of-way situation. But that is in the plans. If that helps. Burt: Now, I've never been inside one of your plants, but I'm familiar with. You actually don't do any quarrying. You haul all your ingredients in, right? Yes. I noticed that one hasn't been out for years, and I never noticed all that. Clark: And the predominant use of this property will be, if y'all please, or 15-20 acres, most of it will be stockpiling, I imagine. Yeah. Henderson: And that is about our footprint. We plan to use approximately 20 acres of this facility. 6 Whitaker: What are your hours of operation daily? Henderson: They do vary. We start early in the morning. We usually start at daylight in the morning. And typical work hours, you know, five. That's not to say we won't have a one-off job sometime during the year, or that we may work nights or something similar. But that's pretty uncommon. We're trying to avoid it as much as possible. Burt: What are you having today? I've been trying to figure it out. What are you having today on trucks out of New York right now? Sarton: Sometimes we don't average any, and I get upset. Burt: I know that because lately you've been pulling to 23 and 28, right? Sarton: It could be. Henderson: It's somewhere between 50 and 60. Burt: OK, that's about what I've been trying to estimate from what they were pulling in. Clark: Have y'all done any traffic preliminary? OK, let's skip your preliminary traffic. What does your current one on average trucks? Sarton: That's about 50 to 60. Burt: That's about right. Yes. Well, I've been counting since I've been counting. I didn't know about this, but I just, you know, being nosy and kind. Walsh: Have y'all looked at any, whatever you need to do to mitigate wind drift, like if you create dust or whatever you might stir up over there where you mitigate that so you're not affecting the greenhouse business close by and their plants and not have an environmental impact on their plants? Henderson: DHEC does require us to keep our stockpiles moisturized. We have to maintain a certain moisture level for the rock, actually, for the mix. So, there'll actually be a sprinkler system on the stockpiles. Walsh: That was my biggest concern, doing something industrial close to the greenhouses is what effect it would have on their business. Henderson: And that's part of the reason we don't want to leave such a buffer. Clark: And just as an FYI, the Planning Commissioners. I know that they have had conversations with Titan and Costa. But I have also called Titan and Costa myself. Titan is on board with it. They don't have any objections. They were quite happy about it. And Costa's response to me was essentially, 'If it doesn't affect me, I don't care.' So right now, the only comment I would say that would be different is their use is industrial, and Costa and Titan are agri-industrial. So that is a difference. But it's still not inappropriate zoning to be industrial. Even if you change the whole, you know, all of Costa's property to industrial, it 7 would not have any effect on Costa at all. So the area is already industrial. I think this is the closest residential property nearby. There are no other residences. No, they are several properties away from it. They are one, two, three properties away. They have not been notified. Sarton: And our site will be paved. You know, all the roads coming into our site, it won't be like you're driving on a dirt road with dust flying. We pave our roads and we have sprinkler systems on timers that keep the pavement. Clark: But I will say that I did have a conversation on the phone with several people that live in the area and once I explained it to them, they decided they weren't going to show up tonight. So that doesn't mean that once we get to the actual development plan, more people won't show up. You know how that goes. Once we announce there's a development of any sort, that gets attention. So that could change. I can't make any promises there. But so far, I haven't received any real feedback. And then their two biggest neighbors I did talk to personally. So the rezoning will go to County Council of course. What y'all are doing tonight will be to recommend for or against to the Council. It goes to them next. I have advised them to at least wait until the second reading of the County Council before they make any submittal to us for an actual plan, and then it will come, the actual development will come to you twice, and then that's it. It won't go back to the council for the development, just the zoning. Sarton: One extra step before it goes to the last step is we have to be in follow-up process with South Carolina DHEC. Clark: I still call them DHEC. Department of Environmental Services. Sarton: Also has to go through their public notification So it's major steps. It's not just the zoning. It's got to go to another step after that. Clark: And on this particular, what they're intending to use it for, DES is going to be a harder hurdle than Edgefield County will be, for sure. Burt: Right now, you say you cook. You do your heating with diesel, right? Do you have to use that additive in that diesel like you do in trucks? You keep down the pollution? You don't have to. OK. I was just wondering about that. So you use off-road. Sarton: A filter system with like 900 bags in it that are eight foot tall. It's part of our requirements from DHEC Burt: So if you went to natural gas, that would be a saving and cleaner, too, right? Sarton: And then we're required by DHEC every two years to run certain tests to stay in compliance. They come to our site every month for inspections, record keeping. It's a tremendous amount of responsibility. It's part of being good neighbors. The property is under contract right now. Morgan: Have y'all asked about the noise? Because I know that's a question that we're going to get. Noise for neighbors if, you know, you really don't hear anything. 8 Sarton: It's not going to be any more than the tractor-trailers that are currently running it, especially with the buffer. Whitaker: It's hard to see that there would be any impact on anything with that large of a buffer all the way around. Sarton: I appreciate that. As I said, we're good neighbors. We're conscientious of being good neighbors. We have been in business in this area since 1954. So we didn't get there by being bad neighbors and bad public communicators. So we want to do things right. Burt: I remember when you went in business. I know you probably weren't there then. I don't have any more questions. Sarton: Thank you. We thank you. Clark: All right, so we'll move on to the capital improvement plan. So as y'all know, both the County Council and yourselves directed staff to start working on impact fees. This is a critical step for impact fees to be applied. We cannot apply them without a capital improvement plan. Now I want to specifically denote that there's a big difference between the economic portion of the and the capital improvement plan. So the economic portion of your comprehensive plan is your wish list. That's the broad 10-year picture of things that the public or the political entities in the county want to see done. And it will include a whole lot of things that may not or cannot be funded in that period. It's just basically a wish list that's prioritized. The capital improvement plan, however, anything that goes on this list is things that have to be funded. So every budget year during this 10-year period, county council will have to fund the items on the list. So when you go to edit this every year, because you will have to see this every year, you will have to redo this. It's important to only put things on there that you know for a fact county council is going to fund. Now, your recommending body in this case, council has the final say, so you can certainly recommend a project that you're not 100% sure on, but at the end of the day council will have to determine the exact items on the list and associate the funding for them. I put some basic rules in there, you know, nothing that would be considered a common purchase or common maintenance or a typical expense for the county, and it needs to be at least a $100,000 project. Then I put all the legalese in there on funding guidelines, rankings, et cetera. And then when you get to the actual list, obviously, EMS headquarters, as y'all know, the funding has already been sorted on that. The money is there. There are other ways that they can get funding. For example, we have the local option sales tax, you know, when that referendum comes back up, they could include an item like this on there and accrue some of that money and then they can shift the money that is in our debt service account over to, you know, other items on the list. The second item that I put on there is a substation in Meriwether. So most of you probably know that our ambulance works out of the Meriwether Fire Station. Well, the Meriwether Fire Department, they could use that space themselves for one. And two, EMS can't grow there. They're kind of locked in where they're at now. We still have a great relationship with the Meriwether Fire Department. It's not like they're kicking us out or anything like that. But we do need to think very soon in the future about securing a location and building a substation specifically for our people down there. We have not had any major developments in Edgefield for a while, but North Augusta is growing at a lightning pace. And even though North Augusta has their own fire and North Augusta has their own police, North Augusta does not 9 do their own EMS. So anything that's built inside the city limits of North Augusta that is in the Edgefield County footprint is served by us for EMS. So that will require us to consider growth items in that area for EMS needs. We can work with the City of North Augusta and come up with ideas for joint public safety buildings. There's a lot of options but one of those options also to acquire funding is impact fees. Now impact fees do not apply on things like you're repairing the deck in your backyard or, you know, you're remodeling your bathroom or what have you. It is new construction only. So if you are building a new home, that impact fee would apply to you. And that impact fee will have to be calculated based on of services in the area, and it has to be specific to an area. So you can't say we're doing a Meriwether substation and then charge people in District 1 on the north side of the county an impact fee for it. That's illegal. We can't do that. So we have to calculate that impact fee on the people it's serving and the percentage we think it will serve. And they will have to pay that fee when they get a building permit for new construction. There are some jurisdictions that have separate impact fees for different types of things. So you might have one for residential, one for commercial, for example, and they could be different. And it all needs to be calculated off of impact. But that is an option. And I think that's one of the primary things we're going to want to use impact fees to collect money for is EMS. So that's why I put it on two, ranked it so high. Now, other things like Star Park, I put that on there. Star Park is mostly funded. The first phase is already funded. The money is sitting in the bank, drawing interest right now. So, in the second half, we have the funding planned, but you know how plans go. So it's on here. Other monies can also be used for that. They can, we can divert part of the funds. We can use bond funds. We can use impact fees. There's a lot of different options. But I think, given that we only build about 160 to 180 new homes a year in Edgefield County, we should probably focus that fee one thing at a time. Because we're not going to, I mean, even if you charged a $1,500 fee, you're not going to generate build a building quickly. So I don't think we need to spread that out too much over multiple projects. You focus on a project, we get it done, and at the next year plan we renegotiate the fees. Because, like I said every year you will be reviewing this. You will not required to change it every year, it is a ten year plan so you are not required to edit or make any changes, you could just make a vote on it and say we recommend it stays the same and it will go straight to council and council will be able to say "We're going to leave it like it is or we are going to add $2 million dollars to the pot." There will be a separate fund just for capital improvement. After this is approved then I can bring you the impact fee study and the impact fee study once it's approved will allow us to actually apply the impact fees. So this is step one to that process. And then I'll answer any questions you have. Whitaker: Did the college ever get back about the impact fee study? Clark: So, I think April has had a few conversations with them. But I don't think the college has very much experience on items specifically like this. So I have started writing it myself. And I'm going to write the impact study, then send it to them, and let their math team review it and make suggestions and edits. They're also probably going to have access to some data that I don't have, and I'll let them do that research and make any recommended changes. And then, of course, y'all are the biggest stakeholder in the process, so y'all will have to read through it carefully and make suggestions and edits. Most of the bulk of the document is going to be things that don't really need much attention. They're going to be census data and, you know, construction data and, you know, percentage of calls in specific areas. You know, how much is Meriwether using compared to County Line? It's going to be a lot of data like that. None of that really will require any editing on y'all's part, but how we spend the funds and how much those fees are will be an 10 important thing for y'all to weigh against, you know, are we being too heavy-handed, not heavy-handed enough, etc. Whitaker: Do we know the number of calls EMS makes in that area, correct? Clark: They do. Whitaker: Do we know the amount of cost and what the growth of that is now? Clark: We do. I don't. But the county does, yes. And I will have all of that in that document. Therefore, there will be a breakdown, as my number one priority is a substation. I will include a project detail sheet specifically for EMS. And I will go to the dispatch center, and I will pull every call that they've had in the last five years and break that down. Whitaker: Just to see a trend. Clark: Correct. You'll see a trend line and I can also, because we use a smart system, I can even tell you exactly how much of it went to new developments as opposed to older developments. You know, this number of calls for areas that are 10 years plus versus 10 years, you know, five years plus. Etc. Walsh: So is that what's on this chart that has the pink and blue on it? Clark: Yes Walsh: Because I couldn't read it online and I certainly can't read it here. Clark: Yeah and it was in the packet and it was very small so I did ask her to email that to you separately. I will fix that and send it to you, and if that doesn't work I'll print big copies then you can come pick them up yeah but yeah the items that are on there are so the items that are on there are the headquarters the substation Star Park which is located in front of the law enforcement center on Star Read and then softball field. So the softball field one was added by David and he's not here to talk about it but I can give you a sort of a basic rundown. So we do not have funds for the softball park we do for Star Park. So we don't even have the property for it yet, but here's the thing: we partner with the Town of Edgefield and Johnston to do softball. Each one of them has a field, and then we have some little league fields out at Bettis Park that we sort of retrofit for softball. The problem is our girls end up spread out. Nobody knows where they're practicing in any given day. Sometimes they're in Johnston, sometimes they're at Bettis Park, sometimes they're here in Edgefield behind the gym over there. We have enough participants that we need to have a centralized location, sort of like, you know, Bettis Park is for boys. We need a more centralized, you know, whether it's three or four fields. I mean, we'd have to work out the finances, but the biggest start of the project, of course, is going to be where are we going to buy the land and put it? So that's going to be our first step is acquisition But we do see a need within the next that 10 that's something we're definitely going to have to address It takes a lot of property to do ball fields, so that's the how much acreage are you saying? Well, it depends on how many fields we end up wanting to build. I mean, you could say 20 acres if you want three fields. But if you want six fields, then of course, you know, you're going to have to go 40 plus. Whitaker: So how much are we looking at? Like, how many fields are we? 11 Clark: We don't know yet. Clark: We have basically three fields that we have people practicing on all the time now. So it would be better to be more than three. So we don't have any girls' softball fields at Bettis. We have six baseball fields. I would say that optimally, we need at least four girls' softball fields. I mean, obviously, boys' baseball is the number one most popular sport in Edgefield County for those age demographics. But we have quite a few girls, I think a hundred and—we have a hundred and something females now. We have enough for many teams, and we kinda find time slots at any available field. And the only one that is set up to move, because you have fast pitch versus slow pitch, and you have to move the bases in different configurations for different setups. And like at Bettis Park, we don't have the ability to move the pitcher's mound for FEMAT. So they kind of just draw a paint line on the line, and they stand there. Now, the softball fields that the town owns, located behind the gym, are an actual girls' softball field, but it's the only one in the county. Whitaker: For some reason, you can't do anything at Bettis because of the pitcher mount, right? Clark: We do use them for practice. But yeah, and we can we mark the fields and they do play games there too. But they're little league fields. They're not softball fields. That's the that's the primary issue where we're marking something for what it's not. And, you know, use your imagination, basically. Girls' softball is designed from the ground up differently from baseball. It would also be beneficial for them to have a dedicated space where they can practice, participate in tournaments, and truly be valued by the recreation department. Butler: So those fields that are behind the National Guard, those are owned by the county? Clark: The National Guard in Johnston? Whitaker: No, in Edgefield. Clark: Those are owned by the city. That's Dixie Youth Baseball Fields. And there's a Pony League field. And three Little League fields and a T-ball field. Two T-ball fields. Yeah, two T-ball fields. Burt: That one over there by the gym, that one's on by the city too, isn't it? Clark: It is owned by the city, and there's one multi-field, so the one closest to the gym can do fast pitch or slow pitch. Girls softball, so the mound moves from 40 feet to 60 feet. And the back fence can move from 80 feet to 110 feet or something like that. I don't remember the exact measurements anymore, but the fence is movable, and the bases are movable. The other field is also a softball field, but it has been in disrepair for many years. I know that they use it for practices and stuff, but they play the games on the primary field. Now, they do at the armory in Johnston, they have another little league field that's unmounted, where they also play girls' softball. And this might not happen this year or next year or even five years from now, but in 10 years, we do see that it's going to be something that we're going to have to address. Walsh: So, I had a question, Doc. For our January Meeting, I'd like to revisit mass grading and discussion. I'm still researching and looking at that and pulling information. So I'd like for us to discuss that. I know 12 we have tree preservation. But in my research, I'm seeing that we still need a mass grading ordinance because there's going to be times when just the tree preservation is not going to provide everything that we want in the county, as far as mass grading. And then I also would like for us to discuss an ordinance for the data centers that are popping up everywhere. I've been reading research on that, and many local counties are implementing ordinances for it. Mostly, they have control over mitigating the noise that the data centers create from, you know, surrounding areas. They have ordinances that prohibit them from being placed near residential areas. Ordinance where, because they use a massive amount of water, they have to have a loop, you know, of recycled water to use. And I'm unsure about what to do regarding the electrical demand. It looks like that has to be a state issue with those data centers, so that they don't increase electrical rates for the neighbors around the data centers, because you know the data centers are using up a lot of electricity, but I know in some communities the power companies are passing that cost on to residential customers. But I think we need to probably talk to our Edgefield County delegation to the State House and Senate and see if the state can put something in there about mitigating that issue. I think for the county we need our own conditional use ordinance if a data center is interested in coming to Edgefield County. Clark: Okay. I will try to find some examples of conditions. Walsh: Yeah, I've been researching and trying to pull some but I just I need more time to to do more reading and research on it. If we can add it to the January agenda in our work session to discuss, that'd be helpful. Clark: Absolutely. Burt: Any more questions at this time? Well, if not, we'll move to adjourn from this wait session to the regular Meeting. Whitaker: Make a motion Butler: Second All voted in favor 5-0. Meeting Adjourned at 5:41 pm 13 The next Planning Commission Meeting is scheduled for January 8, 2026. The Planning Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a work session meeting and at 6:00 p.m. for the regular meeting at the Edgefield County Council Chambers located at 225 Jeter St., Edgefield, SC. These meetings are subject to prior cancellation or change. The public will be notified of any cancellation or change. Individuals requiring special assistance or a sign interpreter to participate in the meeting are asked to please notify the Building & Planning Department 48 hours prior to the meeting at (803) 637 - 4073. Any questions regarding the Planning Commission should be directed to the County’s Planner, April Morgan, at amorgan@edgefieldcounty.sc.gov 14 Edgefield County Planning Commission Meeting Minutes County Council Chambers December 11, 2025 6:00 PM Dustin Doolittle was absent for the December 11, 2025, Meeting Staff Present: April Morgan, Hart Clark Action Items  Call to order- Burt called the December 11, 2025, meeting to order at 6:00 pm  Invocation said by Whitaker and Pledge of Allegiance led by Burt  Approval of December 11, 2025, meeting agenda- Whitaker made the motion to approve, with Butler seconding. All voted in favor (5-0). The motion was passed.  Approval of October 9, 2025 Work Session Minutes- Whitaker made the motion to approve, with Walsh seconding. All voted in favor (5-0). The motion was passed.  Approval of October 9, 2025 Meeting Minutes- Whitaker made the motion to approve, with Butler seconding. All voted in favor (5-0). The motion was passed.  Vote to recommend rezoning application to County Council- Whitaker made the motion to recommend, Butler seconds. There is a discussion. (5-0). The motion was passed  Vote to commend the final discussion regarding the 10-year capital improvement plan for consideration- Whitaker made the motion to approve, with Walsh seconding. All voted in favor (5-0). The motion was passed.  Vote to adjourn meeting- Whitaker made the motion to adjourn the meeting, with Butler seconding. All voted in favor (5-0). The motion was passed. Minutes Burt: Our first item on our agenda is approval of our agenda for our Meeting of December 11th. Can I get a motion? Motion and a second. All in favor, raise your right hand. The ayes have it, so it will be. We require approval for the minutes of the October 9th work session. Can I get a motion? Motion and Second. All in favor, right hand. The ayes have it, so approved. I need a meeting minute approval for Chairman: James Burt – Dist. I Members: Sharron Hadden – Dist. II Vice-Chairman: Lisa Whitaker-Dist. III Karlene Butler– Dist. IV At Large: Autumn Becker Dustin Doolittle- Dist. V At Large: Tracy Walsh 15 October 9th. Make a motion to approve. Second? All in favor raise your right hand. Ayes have it, motion passed. Next, a report from our staff. Morgan: The subdivisions, so we've got six minor subdivision, two exempt, and two plat reviews. That was for the month of October. November we had five minor subdivisions, two exempt, and three plat reviews. And on the back, you have your census report that gives you what permits were issued and for what. An up-to-date number. Clark: And I can send you a more detailed version of that if y'all want it. It'll be monthly, though. And it might not be in line with the Meeting, but I can still send it to you when it's done. It tracks single family additions, alterations, multifamily, et cetera. We've issued only less than 200 home permits, but we've actually hit an all-time record for permits this year. We've issued 1,062 permits in total this year because every roof has had to be rebuilt due to the hurricane, obviously. Also, this will likely never come up for you, but if any of the data line installers, fiber installers start harassing you, their permits are not being ignored. They are being slowed down. That's all. Speaking with representatives from Edgefield County Water and Sewer Authority, Dominion, and several other organizations, including AT&T, it appears that their crews responsible for 811 markings cannot keep up with the number of permits that have been issued. And the contractors are coming from all over the country. There are no specific contractors. And they're not calling 811 back to ensure that the marking actually occurred. And then, as I'm sure all of you have experienced, the next day you wind up with a cell tower down or, you know, a water line's cut or some other issue. During the entire month of last month, I did not issue any new encroachment permits for road or side-of-the-road work. We are slowing them down a little bit, too, and we are doing that just to give time for those 811 operators to catch up with their workload. Once they've caught up a bit, we will start issuing again. So it's not being ignored, it's just being slowed down. Whitaker: Can I ask a question on that line? Clark: Certainly. Whitaker: I have noticed, especially online chat or things like that. Additionally, based on my own experience, the workers coming through AT&T and similar companies, such as Carolina Connect, are leaving a lot of trash. They're leaving lots of their building material or whatever kind of material. In my case, they drove through my front yard with their big, big truck. Tore up my front yard and my driveway, and it's not just me, it's lots of people that were complaining about it and they don't know where to. Clark: So they need to call my office, so 637-4073 and they need to leave a message for our code enforcement officer. We have to, of course, the company that actually does the installing is not the permitted company. It's a third party and they can be from anywhere. It's impossible to find the people who actually did it. So what we have to do is we have to go after the permitted person and 95% of it is Spectrum. But if you report it to our code enforcement, he can pull the actual permit that's in place and contact the project manager directly and get somebody to come clean up. They left a hole. If you go to the bottom parking lot, down there, and walk down the old rail bed, looking to your right, you'll see spools of leftover material that rolled down the hill and were just left and abandoned. So, I have to get the road crane to pick it up and remove it from there because it's a problem that's happening everywhere. And 16 we're working on it. But I think the primary issue is the federal government put out a whole lot of money for rural Internet, basically. And the state's portion was divided among all these companies. And the companies have to get the work done at the last minute. And so, they're now pressing up against their deadlines. So there was a few months ago, I was issuing 13 or more encroachment permits every day. So, an extremely high volume of permits can be issued, ranging from a 100-foot section to six miles of road. So huge impacts in the area. We're slowing them down just for our own sake. But if there are private problems, then they can call the code enforcement officer we can. We can go after the company and say, Hey, y'all need to go clean this up or restore this or fix this or replace a bush or whatever the case may be. Um, but I think my office is who you would call. Whitaker: Another thing too is, you know, they need to be respectful, you know, if they're going to come park 20 feet onto your property with their great big truck, which means they drove a big truck to get the big truck there, and they're going to leave it there for a certain part of the day, I think they should have to at least knock on my door. Others have said the same thing. I read one just last night. You know, it's unnerving, and people just don't know what to do about it. Clark: Yeah, I'm sure the sheriff's probably about to pull what little hair has left out of his head. I'm sure he's getting calls constantly, all day, every day. Unfortunately, as I mentioned, these companies are third- party, and they come from all over the place. There's really no way for us to show up; if they're not actually physically there, then we might never see that company again. Therefore, we must pursue the permit holder. But you can always call my office. We'll take care of it. Burt: Thank you. Ok, one question on this. The permit just covers the kind of state property, right? I mean, I know they're using right-of-way, but if they're going out, they can contact Aiken Electric Co-op right away. Clark: Right. As you are aware, I serve as the CTC administrator for the county, in addition to my other roles. And part of that is doing this. Just like DOT, if you want to place something in the public right-of- way, you must obtain permission for it. You need to submit the paperwork and obtain the necessary approval. Additionally, you must complete step 811, and several other steps are involved. That way, if you tear up a storm drain or something of that nature, it's not on public cost. We can charge them for it. I also issue those encroachment permits, but only for county-owned roads. If you live on a private road and have seen them without permission from the road's owner, then you need to contact the owner of that road. And then, of course, state roads have to go through the DOT. And DOT and I are on the same page. Obviously, I don't know who owns every private road in the county, but DOT and the county are on the same page. Burt: They've got different methods. They're using the drilling in the potholes. I like to follow a system because they don't make it bigger than this, depending on the crew. Because I see what someone went through, you can't see it telling it being there. I said, I don't believe this. I can't do that good a job myself when I'm digging. OK, some of the reports. No guest speakers, right? OK. Public hearing. This Post and Planning Commission, we're going to allow for comment from citizens regarding public hearing item on the agenda during this Meeting. Which is the rezoning. Anybody signed up for this? 17 Ashley: My name is Ashley. I wanted to speak tonight in regards with I'm kind of concerns with the primarily due to the close proximity to the school and crops. If it's rezoned from commercial to industrial, is that not what we're discussing? The three parcels are being rezoned. Douglas Elementary, that's right down the road. Yeah. Okay. I'm concerned about that in regards with the potential to create hazardous pollutions, contamination, and noise disruptions. The Journal of Human Resources found that students attending schools within a mile of industrial pollution sources had significantly lower test scores. In Houston, Texas, a concrete plant operating within a mile of a school exposed children to a carcinogen that caused nosebleeds and respiratory illnesses, which was also cited by the EPA. And a similar situation in Mossville, Louisiana, Port Arthur, Texas, and crops and livestock have been noted in multiple cases as well. And I also wanted to touch on, as you are aware, first and foremost, the responsibility of any board in power is to the community in which they serve. Leadership demands integrity, humility, and strength to stand up for what you know is right, and should be able to provide fact-based reasoning should your stance on any kind of situation change drastically. Because shifting positions without accountability weakens public trust, true leadership is shown through transparency, fairness, and the willingness to uplift the people in which you represent. Should someone in a position of power lack these qualities or the ability to provide fact-based merit behind a change of opinion, maybe their vote and or position should be evaluated. Burt: All right, thank you, ma'am. I appreciate it. All right, we'll close the public hearing. We do not have any old business, so we will proceed to our new business. Now, the new business at hand is the vote to recommend and final discussion regarding the application submitted on parcel numbers out, 174-00-00- 072-00, 174-00-00-071-00, and 174-00-00-040-000, which is located off Greenhouse Road. This application is requesting that these applicants that we see on our map be rezoned from general commercial to industrial commercial, which is ID. Clark: So somebody can make a motion to recommend that item. Then you go into discussion. If you have any more questions, you can ask the owner to step back up. If you don't, then you can simply vote on it and move to the next item. Whitaker: I make a motion to recommend. Butler: Second. Burt: Okay, any discussion? Walsh: I would just like to address Ms. Williams concerns and I asked questions during the work session about that because there are greenhouse operations near there and Sara's farm venture and Sara's and that industry the asphalt manufacturing industry is highly regulated federal and state and they are monitored I believe you said monthly they are monitored monthly and they do have to put in mitigation I don't know infrastructure to reduce the environmental impact around them. So I feel like the federal and state standards that they have to meet cover what our concerns would be as neighbors. Whitaker: Also on the noise complaint, it would be no more noise than is there already. We've already discussed that in the work session as well and it's nothing more than a truck going up the road. We have trucks going up the road all the time. 18 Walsh: And they're going to leave a wide vegetative buffer around it. Whitaker: 75 foot buffer all the way around. So noise should not be an issue. Dust is not an issue because they have a water sprinkler system that will mitigate any of the dust that goes, I believe it's in and out, and it's on an asphalt road, not a dirt road. So you won't have dirt. You're not going to have any of that. So they're going to have their work cut out for them. Well, of course, they're going to have to obtain DOT approval. Of course, they're going to have DOT approval, but their hope is to have three in-and-out ways and possibly a turn lane that would help with all of that. So they are looking forward to all the problems that could arise. Ashley: Has there been any mention of possibly putting in any sort of light, like traffic light or anything? Whitaker: That's up to DOT, not them. Ashley: But my question is, unless all the trucks are going to go towards Saylor's Farm Adventure, they're going to be coming out on Highway 25. Whitaker: There's going to be three entrances. So it's not everybody's going to head to that one entrance and go out that one There's three different ways to come in and out. But that happens a lot. I mean, there was just one today up the road, but not there. I mean, we have accidents everywhere because people can't drive. So, Lord help us. Go ahead. Burt: At present, the traffic is not going to really change a little direction. Because right now, and for the past, down at the Eureka plant, all those cars, those trucks are coming up in 191. And right now, when they're going there, like they're hauling daily now, all those trucks are coming up, because they've got to go up 25 283 and all. Clark: Just as a comment. This is a rezoning application. They have not even started the development application. When they get to the development application, we'll have a full traffic study to look at and that will tell us a lot more about the traffic situation. This is not approving the development of anything. Burt: Any more questions? We have the motion on the floor to approve the recommendation to the County Council for the rezoning of these three lots from General Commercial to Industrial. All in favor raise your right hand, 5-0, ayes have it. Let's see, now we need to vote on the recommendation, final discussion regarding the 10-year capital improvement plan for consideration. Whitaker: Make a motion. Walsh: Second. Burt: Motion is seconded. We're going to send it up for consideration, right? Because we're going to be working on it. All in favor of said motion, raise your right hand. Ayes have it. I think that's all we have. It's the Christmas season; have a merry Christmas, everyone. We had a good year. It was quite tough, but everybody managed to maintain their self-control. I really enjoyed working with all of you this year. I get a lot of comments form the public that a lot of people think we are doing a good job. That is about it. We 19 look forward to another year of working for the public, giving our input, and doing the best that we can. I appreciate everybody not taking it personally, but looking at what we do for our County. The next Planning Commission Meeting is scheduled for January 8, 2025. The Planning Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a work session meeting and at 6:00 p.m. for the regular meeting at the Edgefield County Council Chambers located at 225 Jeter St., Edgefield, SC. These meet ings are subject to prior cancellation or change. The public will be notified of any cancellation or change. Individuals requiring special assistance or a sign interpreter to participate in the meeting are asked to please notify the Building & Planning Department 48 hours prior to the meeting at (803) 637 - 4073. Any questions regarding the Planning Commission should be directed to the County’s Planner, April Morgan, at amorgan@edgefieldcounty.sc.gov

Source: Edgefield County website. First collected Oct 13, 2026.