County Transportation Committee Agenda & Packet for July 23, 2026
Georgetown County · Georgetown County · meeting of Jul 23, 2026 · Agenda packets
Open the original document More from Georgetown County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CTC
Location:
Date:
Time:
Council Chambers, 129 Screven Street, Georgetown, SC 29440
Thursday, July 23rd, 2026
5:30 P.M.
I. Determination of Quorum and Call to Order/CTC Chairman Jimmy Greene
a. Approval of Minutes from August 11th, 2025 meeting: ATTACHMENT A
b. Approval of Agenda
II. Public Comments
III. Old Business (None)
IV. Consent Agenda (None)
V. CTC Report
a. Forecasted Apportionment for Fiscal Year 2026-27 Review of recent SCDOT:
b. Monthly Statements (May 2026): ATTACHMENT B
i. C Fund Statement
ii. Proviso 118.19
iii. Proviso 118.2o
iv. Proviso 118.22
VI. Local Projects Status Report
a. SCDOT
b. Georgetown Director’s Report: ATTACHMENT C
VII. Programming Requests
a. Explanation of Available Funds
b. Georgetown County: ATTACHMENT D
c. SCDOT: ATTACHMENT E
VIII. New Business
IX. Adjournment
County Transportation Committee Meeting Agenda County Transportation Committee Meeting Agenda
ATTACHMENT A
CTC
Location: Council Chambers, 129 Screven Street, Georgetown, SC 29440
Date: Monday, August 11th, 2025
Time: 5:00 P.M. – 5:59 P.M.
Present:
Chairman Jimmy Greene, Vice chair Jarrod Bardon, Ross Marple, Sammy Grayson, Wesley
Hooks, Claude Bibb
Absent: Richard Hanson
I. Determination of Quorum and Call to Order/CTC Chairman Jimmy Greene
Chairman Jimmy Greene called the meeting to order at 5:00 P.M. A quorum was determined to be
present.
a. Approval of Minutes from September 16th, 2024 meeting: Attachment A
Motion: Approve the minutes from the September 16, 2024 meeting.
Action: Motion passed unanimously. Motioned by Ross Marple and seconded by Sammy Grayson.
b. Approval of Agenda
Motion: Approve the August 11, 2025 agenda.
Action: Motion passed unanimously. Motioned by Sammy Grayson and seconded by Jarrod Bardon.
II. Public Comments
No members of the public spoke during the public comment period.
III. Old Business
None.
IV. Consent Agenda: Attachment B
a. Programming Requests P043871, P043295, & P042954
The Consent Agenda included Programming Requests P043871, P043295, and
P042954 (Attachment B). These items were presented as part of the overall
programming requests considered later in the meeting.
V. CTC Report
a. Forecasted Apportionment for Fiscal Year 2025-26 Review of recent SCDOT:
Ray Funnye reported that Georgetown County's estimated FY 2025–2026 CTC apportionment is
$2,209,600, which will be used for planning and programming purposes.
Mr. Funnye explained that approximately one-third of CTC funding is allocated toward SCDOT projects
in accordance with program requirements.
County Transportation Committee Meeting Minutes
Page 2
CTC
b. Monthly Statements (May 2025): ATTACHMENT D
Mr. Funnye reviewed the June 30, 2025 monthly financial statement, noting that:
The committee received approximately $216,100 in June apportionment and $34,627 in interest
earnings.
Total withdrawals during June included approximately $1.1 million for SCDOT projects and $711,000
for local projects.
The June 30 cash balance was approximately $7.1 million.
Committed project funding totaled approximately $5.3 million, leaving an uncommitted balance of
approximately $1.8 million.
Mr. Funnye further reported:
Georgetown County remains in compliance with the requirement that at least 33% of CTC funds be
programmed on state-maintained roads. Current participation is approximately 61%.
The County also remains in compliance with SCDOT's requirement regarding maximum allowable
uncommitted balances.
Chairman Greene asked why the County's participation exceeded the required 33 percent. Mr. Funnye
explained that the committee has historically approved additional SCDOT projects beyond the minimum
required allocation, resulting in the higher percentage.
Proviso Reports
Mr. Funnye reviewed the status of the proviso accounts:
Proviso 118.19 – Fully committed.
Proviso 118.20 – Fully committed.
Proviso 118.22 – Approximately $230,300 remains uncommitted and is proposed for programming
during this meeting.
No committee action was required.
VI. Local Projects Status Report
a. SCDOT
Will Anderson, Assistant Resident Maintenance Engineer, provided an update on active SCDOT projects.
Current resurfacing work on Village Road, Wildwood Avenue, and Dave McKenzie Road is nearing
completion. Remaining work includes shoulder repairs, hydroseeding, rumble strips, pavement markings,
and raised pavement markers.
Chairman Greene inquired about the status of Johnson Road. Mr. Anderson advised the project has not
yet been accepted as complete and indicated that remaining items are still being addressed.
Page 3
CTC
Committee member Sammy Grayson asked about Mount Zion Road. Mr.
Anderson explained that contractors often complete work in phases across
multiple roads before returning to finish individual projects
b. Georgetown Director’s Report: ATTACHMENT E
Kevin provided updates on several County projects, including:
South First Street remains in engineering and is being coordinated with stormwater improvements.
Linden Circle/Tulip Tree Court and Goodson Loop remain in design while drainage easements are
secured.
Evert Road and East CCC Road continue receiving slag material as available.
Several resurfacing and striping projects have been completed and are awaiting final pavement
markings.
Seal coating projects have been completed successfully.
Grate Avenue drainage improvements are being revised.
Carrie Road drainage improvements are being prepared before resurfacing.
Mr. Funnye further explained delays associated with South First Street, including stormwater coordination
and environmental permitting.
VII. Programming Requests
a. Explanation of Available Funds
Before presenting programming requests, Mr. Funnye summarized available funding:
FY 2025–2026 Apportionment
Proviso 118.22 Balance
Uncommitted CTC Balance
July Revenue Projection
Total available revenue was approximately $4.4 million.
b. Georgetown County: ATTACHMENT F
Kevin presented the County's proposed programming requests, including:
Additional funding for Lincolnshire Drainage Improvements
Pavement preservation projects
Porter Road rock improvements
Countywide resurfacing projects based on the most recent Pavement Condition Index (PCI)
assessment.
Committee members discussed the Lincolnshire project and confirmed the revised funding estimate
represented the best available cost projection based on current construction conditions.
As well as resurfacing of 13 other roads.
The total County programming request was approximately $2.65 million.
Page 4
CTC
Motion: Approve Georgetown County Programming Requests as presented.
Action: Motion passed unanimously. Motioned by Jarrod Bardon and
seconded by Sammy Grayson.
c. SCDOT: ATTACHMENT G
Will Anderson presented SCDOT's programming requests:
David W Ray Drive reclamation and resurfacing
Driftwood Avenue resurfacing
Sumter Street full-depth patching and resurfacing
Total SCDOT request: approximately $1.79 million.
Motion: Approve SCDOT Programming Requests as presented.
Action: Motion passed unanimously. Motioned by Jarrod Bardon and seconded by Ross Marple.
VIII. New Business
a. Approval of “Johnny Morant Highway” Signage: Attachment H
The committee considered funding for the Johnny Morant Highway signage project.
Motion: Approve funding for the Johnny Morant Highway signage.
Action: Motion passed unanimously. Motioned by Ross Marple and seconded by Jarrod Bardon.
b. Approval of revised Transportation Plan: Attachment I
Mr. Funnye explained revisions to the Transportation Plan, including returning administration of the CTC
program to SCDOT. The change eliminates local administrative costs and streamlines program
administration.
Motion: Approve the revised Transportation Plan.
Action: Motion passed unanimously. Motioned by Jarrod Bardon and seconded by Wesley Hooks.
c. Vice Chair Election
Chairman Greene opened nominations for Vice Chair.
Ross Marple nominated Jarrod Bardon.
With no further nominations, nominations were closed.
Motion: Elect Jarrod Bardon as Vice Chair.
Action: Motion passed unanimously.
Chairman Greene congratulated Vice Chair Bardon and welcomed him into the position.
Retirement Recognition
Chairman Greene recognized Ray Funnye on his retirement after 33 years of service to Georgetown
County, thanking him for his leadership, guidance, and dedication to the County and the CTC.
Sammy Grayson expressed his support for the Chairman's remarks, followed by Wesley Hooks.
Page 5
CTC
Ray Funnye thanked the committee for the recognition and reflected on his
career with Georgetown County. He acknowledged the contributions of
County staff and committee members and expressed confidence in the future leadership of the program.
Mr. Funnye also recognized Claude Bibb for his longstanding service on the CTC, noting that Mr. Bibb
has served since the committee's inception and has played a significant role in advancing transportation
improvements throughout Georgetown County.
IX. Adjournment
With no further business before the Committee:
Motion: Adjourn.
Action: Motion passed unanimously.
The meeting was adjourned.
PAGE 1 OF 3
$ 9,253,620.75
May 31, 2026
Georgetown CTC - Monthly C-Fund Statement - Recurring Funds Summary
3.99 cents Gas Tax for May 2026 $ 183,041.92
Interest Received for May 2026 $ 11,014.71
FUNDS RECEIVED IN MAY 2026
GAS TAX FUNDS Georgetown CTC is DOT-Administered. This statement
reflects the entire program.
MAY 1, 2026 - CASH BALANCE:
Adjustments $ -
Donor Bonus
WITHDRAWALS IN MAY 2026
TOTAL FUNDS RECEIVED IN MAY 2026 $ 194,056.63
3% Fee for SCDOT Administration
State Project Expenditures $ -
Local Project Expenditures $ -
Administrative Expenses per Section 12-28-2740(B) of the C-fund Law
Per Diem
$ 9,447,677.38
TOTAL WITHDRAWALS IN MAY 2026 $ -
Remaining Budget on Local Projects $ 6,894,411.43
Remaining Budget on State Projects $ 2,198,752.09
COMMITMENTS OF CASH BALANCE:
MAY 31, 2026 - CASH BALANCE:
Bond Repayment $ -
Recurring Funds Available to go to SCDOT Contract: $ 354,513.86
Each CTC must spend 25.0% of their FY 2024 - 2025 Apportionment and 33.3% of their FY 2025 - 2026 Apportionment on State Highway System during these two fiscal years.
UNCOMMITTED BALANCE: $ 354,513.86
TOTAL FUNDS COMMITTED $ 9,093,163.52
8,160,413.59 5,361,803.52 65.71%
Previous Year FY 2024 - 2025 5,950,813.59 3,565,076.12 59.91%
Current Year
Fiscal Year Annual Apportionment Total State Expenditures Apportionment % Spent
FY 2025 - 2026 2,209,600.00 1,796,727.40 81.31%
2,209,600.00 6,628,800.00 354,513.86
The uncommitted balance of each CTC must not exceed 300% of its annual apportionment.
Is the CTC in compliance (Yes/No)? Yes
This chart includes the state requirement for the 2024 Proviso 118.22 Fund.
Annual Apportionment for FY 2025 - 2026 300% of Annual Apportionment Uncommitted Balance
Is the CTC in compliance (Yes/No)? Yes
ATTACHMENT B
PAGE 2 OF 3
PROJECT ID
RESPONSIBLE
AGENCY
PROJECT
PHASE
INITIAL
PROGRAM
DATE
P039481 SCDOT CON Jan-20 678,587.12 678,587.12 678,587.12 678,587.12 - - -
P039481 SCDOT PE, CE&I Jan-20 42,627.25 42,627.25 42,627.25 42,627.25 - - -
P039483 SCDOT CON Jan-20 477,209.04 477,209.04 401,837.32 401,837.32 75,371.72 75,371.72 -
P039483 SCDOT PE, CE&I Jan-20 31,813.94 31,813.94 31,813.94 31,813.94 - - -
P041007 SCDOT CON Oct-21 291,742.68 291,742.68 223,436.92 223,436.92 68,305.76 68,305.76 -
P041007 SCDOT PE, CE&I Oct-21 83,128.15 83,128.15 83,128.15 83,128.15 - - -
P041350 SCDOT CON Feb-22 1,092,430.76 1,092,430.76 931,770.90 931,770.90 160,659.86 160,659.86 -
P041350 SCDOT PE, CE&I Feb-22 72,828.71 72,828.71 72,828.71 72,828.71 - - -
P042134 SCDOT CON Oct-22 1,115,833.61 1,115,833.61 1,068,003.32 1,068,003.32 47,830.29 47,830.29 -
P042134 SCDOT PE, CE&I Oct-22 251,010.13 251,010.13 251,010.13 251,010.13 - - -
P042954 SCDOT CON Sep-23 656,050.64 656,050.64 627,789.47 627,789.47 28,261.17 28,261.17 -
P042954 SCDOT PE, CE&I Sep-23 42,452.05 42,452.05 42,452.05 42,452.05 - - -
P043295 SCDOT CON Feb-24 487,348.44 487,348.44 465,252.55 465,252.55 22,095.89 22,095.89 -
P043295 SCDOT PE, CE&I Feb-24 46,368.90 46,368.90 46,368.90 46,368.90 - - -
P045078 SCDOT CON Aug-25 540,717.00 540,717.00 540,717.00 540,717.00 -
P045078 SCDOT PE, CE&I Aug-25 2,000.00 2,000.00 2,000.00 2,000.00 -
P045079 SCDOT CON Aug-25 1,251,510.40 1,251,510.40 1,251,510.40 1,251,510.40 -
P045079 SCDOT PE, CE&I Aug-25 2,000.00 2,000.00 2,000.00 2,000.00 -
P045126 SCDOT CON Sep-25 500.00 500.00 500.00 500.00 - - - CLOSED Mar-26
7,166,158.82 - 7,166,158.82 4,967,406.73 - 4,967,406.73 2,198,752.09 2,198,752.09 -
7,166,158.82 - 7,166,158.82 4,967,406.73 - 4,967,406.73 2,198,752.09 2,198,752.09 -
MAY 1 BUDGET
MONTHLY
BUDGET
CHANGES MAY 31 BUDGET
GEORGETOWN CTC - MONTHLY C-FUND STATEMENT - MAY 2026 - RECURRING FUNDS
PROJECT
STATUS
MAY 1 TOTAL
EXPENDITURES
PROJECTS ON THE STATE HIGHWAY SYSTEM
RESURFACE S-22-180 JACKSON VILLAGE RD AND S-22-579 DAVE
MCKENZIE RD
RESURFACE S-22-566 LANES CREEK DRIVE
PROJECT DESCRIPTION
RESURFACE S-22-180 JACKSON VILLAGE RD AND S-22-579 DAVE
MCKENZIE RD
MONTHLY
EXPENDITURES
MAY 31 TOTAL
EXPENDITURES
MAY 1
REMAINING
BUDGET
MAY 31
REMAINING
BUDGET
MAY 31
BUDGET
OVERRUN
RESURFACING CON MALLARD CIRCLE S-22-23, WHITEHALL AVE. S-
22-23 AND GARRISON RD. S-22-119
RESURFACING DUNBAR RD S-22-179 AND SOUTH ISLAND RD. S-22-
18
RESURFACING S-22-180 JACKSON VILLAGE RD; ARCHER RD. AND
FOREST AVE.
RESURFACING CON MALLARD CIRCLE S-22-23, WHITEHALL AVE. S-
22-23 AND GARRISON RD. S-22-119
RESURFACE S-22-566 LANES CREEK DRIVE
RESURFACING S-22-180 JACKSON VILLAGE RD; ARCHER RD. AND
FOREST AVE.
RESURFACING OF DAVE MCKENZIE RD.
FULL DEPTH PATCH AND RESURFACING OF DRIFTWOOD AVE.
RESURFACING OF VILLAGE RD. AND WILDEWOOD AVENUE
RESURFACING OF DAVE MCKENZIE RD.
RESURFACING DUNBAR RD S-22-179 AND SOUTH ISLAND RD. S-22-
18
RESURFACING OF VILLAGE RD. AND WILDEWOOD AVENUE
RECLAMATION AND RESURFACING OF DAVID RAY RD.
DEDICATION SIGN - MORANT HIGHWAY
FULL DEPTH PATCH AND RESURFACING OF DRIFTWOOD AVE.
RECLAMATION AND RESURFACING OF DAVID RAY RD.
TOTAL STATE PROJECTS WITH RECURRING FUNDS
PAGE TOTAL
PAGE 3 OF 3
PROJECT ID
RESPONSIBLE
AGENCY
PROJECT
PHASE
INITIAL
PROGRAM
DATE
P042987 GEORGETOWN
COUNTY CON Oct-23 155,885.89 155,885.89 155,885.89 155,885.89 - - - CLOSED Apr-26
P042988 GEORGETOWN
COUNTY CON Oct-23 88,501.90 88,501.90 88,501.90 88,501.90 - - - CLOSED Apr-26
P042989 GEORGETOWN
COUNTY CON Oct-23 - - - - - CLOSED Apr-26
P042990 GEORGETOWN
COUNTY CON Oct-23 845,271.80 845,271.80 845,271.80 845,271.80 -
P042991 GEORGETOWN
COUNTY CON Oct-23 - - - - - CLOSED Apr-26
P042992 GEORGETOWN
COUNTY CON Oct-23 669,750.00 669,750.00 29,632.06 29,632.06 640,117.94 640,117.94 -
P042993 GEORGETOWN
COUNTY CON Oct-23 273,867.50 273,867.50 273,867.50 273,867.50 - - - CLOSED Apr-26
P042997 GEORGETOWN
COUNTY CON Oct-23 78,421.00 78,421.00 78,421.00 78,421.00 -
P042998 GEORGETOWN
COUNTY CON Oct-23 52,205.00 52,205.00 52,205.00 52,205.00 -
P043000 GEORGETOWN
COUNTY CON Oct-23 18,943.06 18,943.06 960.00 960.00 17,983.06 17,983.06 -
P043003 GEORGETOWN
COUNTY CON Oct-23 18,616.87 18,616.87 18,616.87 18,616.87 - - - CLOSED Apr-26
P043006 GEORGETOWN
COUNTY CON Oct-23 175,000.00 175,000.00 175,000.00 175,000.00 -
P043160 GEORGETOWN
COUNTY CON Dec-23 669,750.00 669,750.00 49,032.57 49,032.57 620,717.43 620,717.43 -
P043285 GEORGETOWN
COUNTY CON Jan-24 15,000.00 15,000.00 3,084.80 3,084.80 11,915.20 11,915.20 -
P043286 GEORGETOWN
COUNTY CON Jan-24 32,000.00 32,000.00 32,000.00 32,000.00 -
P043870 GEORGETOWN
COUNTY CON Sep-24 850,000.00 850,000.00 850,000.00 850,000.00 -
P043871 GEORGETOWN
COUNTY CON Sep-24 75,000.00 75,000.00 75,000.00 75,000.00 -
P043872 GEORGETOWN
COUNTY CON Sep-24 325,000.00 325,000.00 325,000.00 325,000.00 -
P043873 GEORGETOWN
COUNTY CON Sep-24 125,000.00 125,000.00 125,000.00 125,000.00 -
P043874 GEORGETOWN
COUNTY CON Sep-24 390,000.00 390,000.00 390,000.00 390,000.00 -
P045073 GEORGETOWN
COUNTY CON Aug-25 980,000.00 980,000.00 980,000.00 980,000.00 -
P045074 GEORGETOWN
COUNTY CON Aug-25 94,000.00 94,000.00 94,000.00 94,000.00 -
P045075 GEORGETOWN
COUNTY CON Aug-25 1,555,780.00 1,555,780.00 1,555,780.00 1,555,780.00 -
P045076 GEORGETOWN
COUNTY CON Aug-25 26,000.00 26,000.00 26,000.00 26,000.00 -
7,513,993.02 - 7,513,993.02 619,581.59 - 619,581.59 6,894,411.43 6,894,411.43 -
7,513,993.02 - 7,513,993.02 619,581.59 - 619,581.59 6,894,411.43 6,894,411.43 -
MONTHLY
BUDGET
CHANGES
GEORGETOWN CTC - MONTHLY C-FUND STATEMENT - MAY 2026 - RECURRING FUNDS
MAY 31 BUDGET
MAY 1 TOTAL
EXPENDITURES
MONTHLY
EXPENDITURES
MAY 31 TOTAL
EXPENDITURESPROJECT DESCRIPTION
RESURFACING INDUSTRIAL LANE
RESURFACING - MAIDENBUSH RD., PROVERBS LN., RUFUS LP.,
LAWHORN LP., REED CT. AND GISSETT AVE.
MAY 1
REMAINING
BUDGET
MAY 31
REMAINING
BUDGET
MAY 31
BUDGET
OVERRUN
PROJECT
STATUS
LOCAL ROAD PROJECTS [NOT ON THE STATE HIGHWAY SYSTEM]
MAY 1 BUDGET
SEALCOATING - GILMAN, PARISH REYNOLDS, SIDDONS, DUNNING,
COGDILL
MIS. COUNTY ADMINISTRATION COSTS - FEASIBILITY, R/W
ACQUISITION, COST ESTIMATES, SCHEDULING ETC.
MATERIAL FOR COUNTY MAINTENANCE
RESURFACING LINDEN CIRCLE AND TULIP TREE CT.
RESURFACING - GEORGIEVILLE, OTIS, PROVIDENCE, ROBIN, GATOR,
UNDERWOOD
SEALCOATING - BOBCAT, COLE SUMMERTIME, MEDIA, SONGBIRD
RD.
ROAD CONSTRUCTION JAMES DR./MILLER RD.
ROAD RESURFACING - GRATE, BROWN BARK, S. FIRST, BELAIR,
PRINCE CREEK
ROAD CONSTRUCTION COVE LN.
PAVEMENT PRESERVATION-CRACKFILL/SEALCOAT - LINKS BROOK
COMMUNITY
GRATE AVE. DRAINAGE
RECONSTRUCT CARRIE RD.
RE-ROCK EAST CCC ROAD - 3"SLAG
ROAD RESURFACING - 2" OVERLAY - SEA DOLLAR DR., ROVERBIRCH
LN., HERON WAY, SOPHIA LN.
ROAD STRIPING/PAVEMENT MARKERS - WATERFORD RD.,
CLEARWATER DR., MINTWOOD AVE., BLACKBERRY AVE
ROAD STRIPING/PAVEMENT MARKERS - SHILOH, FRANCIS
MARION, CHEROKEE, MOBLEY, AMOS, POND, BEAUMONT ETC.
DRAINAGE IMPROVEMENTS AND RE-PAVING OF GOODSON LOOP
RE-ROCK EVERT RD.
PAGE TOTAL
TOTAL LOCAL PROJECTS WITH RECURRING FUNDS
ROCKING PORTER RD.
RESURFACING OF HOLMES DR., PORCHESTER RD., COURTFIELD DR.
ETC. - FULL LIST ON FILE
PAVEMENT PRESERVATION SEALCOAT - SIMPSON LP., ROSEWOOD
DR., DESSUENCY CT. AND SOUTHGATE CT.
DRAINAGE IMPROVEMENTS ON LINCOLNSHIRE DR.
PAGE 1 OF 2
$ 304,854.79
May 31, 2026
Georgetown CTC - Monthly C-Fund Statement - Proviso 118.19 Funds Summary
Distribution during May 2026 $ -
Interest Received for May 2026 $ -
FUNDS RECEIVED IN MAY 2026
GAS TAX FUNDS These funds are sourced from the $50 million earmark provided to the
CTCs in SFY 2021-22.
MAY 1, 2026 - CASH BALANCE:
Adjustments $ -
WITHDRAWALS IN MAY 2026
TOTAL FUNDS RECEIVED IN MAY 2026 $ -
State Project Expenditures $ -
Local Project Expenditures $ -
$ 304,854.79
TOTAL WITHDRAWALS IN MAY 2026 $ -
Remaining Budget on Local Projects $ -
Remaining Budget on State Projects $ 304,854.79
COMMITMENTS OF CASH BALANCE:
MAY 31, 2026 - CASH BALANCE:
Proviso 118.19 Funds Available to go to SCDOT Contract: $ -
Each CTC must spend 00% of its Proviso 118.19 Funds on the State Highway System (SHS).
TOTAL FUNDS COMMITTED $ 304,854.79
*All reported state expenditures reflect only those projects managed by SCDOT.
Fiscal Year CTC's Total Apportionment Total State Expenditures % Spent on SHS
UNCOMMITTED BALANCE: $ -
FY 2025 - 2026 - - #DIV/0!
This chart does NOT include the state requirement for the CTC's recurring gas tax funds.
PAGE 2 OF 2
PROJECT ID
RESPONSIBLE
AGENCY
PROJECT
PHASE
INITIAL
PROGRAM
DATE
P042134 SCDOT CON Oct-22 2,649,318.25 2,649,318.25 2,344,463.46 2,344,463.46 304,854.79 304,854.79 -
2,649,318.25 - 2,649,318.25 2,344,463.46 - 2,344,463.46 304,854.79 304,854.79 -
2,649,318.25 - 2,649,318.25 2,344,463.46 - 2,344,463.46 304,854.79 304,854.79 -
MAY 1 BUDGET
MONTHLY
BUDGET
CHANGES
MAY 31
BUDGET
MAY 1 TOTAL
EXPENDITURES
MONTHLY
EXPENDITURES
MAY 31 TOTAL
EXPENDITURES
MAY 1
REMAINING
BUDGET
PROJECTS ON THE STATE HIGHWAY SYSTEM
GEORGETOWN CTC - MONTHLY C-FUND STATEMENT - MAY 2026 - PROVISO 118.19 FUNDS
MAY 31
BUDGET
OVERRUN
PROJECT
STATUSPROJECT DESCRIPTION
RESURFACING DUNBAR RD S-22-179 AND SOUTH ISLAND RD. S-22-
18
MAY 31
REMAINING
BUDGET
TOTAL STATE PROJECTS WITH PROVISO 118.19 FUNDS
PAGE TOTAL
PAGE 1 OF 2
TOTAL FUNDS COMMITTED $ 380,000.00
UNCOMMITTED BALANCE: $ -
Remaining Budget on Local Projects $ -
Remaining Budget on State Projects $ 380,000.00
COMMITMENTS OF CASH BALANCE:
MAY 31, 2026 - CASH BALANCE: $ 380,000.00
TOTAL WITHDRAWALS IN MAY 2026 $ -
State Project Expenditures $ -
Local Project Expenditures $ -
WITHDRAWALS IN MAY 2026
TOTAL FUNDS RECEIVED IN MAY 2026 $ -
Adjustments $ -
Distribution during May 2026 $ -
Interest Received for May 2026 $ -
FUNDS RECEIVED IN MAY 2026
GAS TAX FUNDS These funds are sourced from the $20 million earmark provided to the
CTCs in SFY 2023-24.
MAY 1, 2026 - CASH BALANCE: $ 380,000.00
May 31, 2026
Georgetown CTC - Monthly C-Fund Statement - Proviso 118.20 Funds Summary
PAGE 2 OF 2
PROJECT ID
RESPONSIBLE
AGENCY
PROJECT
PHASE
INITIAL
PROGRAM
DATE
P043875 GEORGETOWN
CO CON Sep-24 380,000.00 380,000.00 380,000.00 380,000.00 -
380,000.00 - 380,000.00 - - - 380,000.00 380,000.00 -
380,000.00 - 380,000.00 - - - 380,000.00 380,000.00 - TOTAL STATE PROJECTS WITH PROVISO 118.20 FUNDS
PAGE TOTAL
MAY 31
REMAINING
BUDGET
MAY 31
BUDGET
OVERRUN
PROJECT
STATUSPROJECT DESCRIPTION
PAVING AND DRAINAGE IMPROVEMENTS - SPRING GULLY
COMMUNITY, PLAYER ST., LINCOLNSHIRE DR., ALLEN LN. ETC.
MAY 1 BUDGET
MONTHLY
BUDGET
CHANGES
MAY 31
BUDGET
MAY 1 TOTAL
EXPENDITURES
MONTHLY
EXPENDITURES
MAY 31 TOTAL
EXPENDITURES
MAY 1
REMAINING
BUDGET
PROJECTS ON THE STATE HIGHWAY SYSTEM
GEORGETOWN CTC - MONTHLY C-FUND STATEMENT - MAY 2026 - PROVISO 118.20 FUNDS
PAGE 1 OF 2
$ 3,570,000.00
May 31, 2026
Georgetown CTC - Monthly C-Fund Statement - Proviso 118.22 Funds Summary
Distribution during May 2026 $ -
Interest Received for May 2026 $ -
FUNDS RECEIVED IN MAY 2026
GAS TAX FUNDS These funds are sourced from the $200 million earmark provided to the
CTCs in SFY 2024-25.
MAY 1, 2026 - CASH BALANCE:
Adjustments $ -
WITHDRAWALS IN MAY 2026
TOTAL FUNDS RECEIVED IN MAY 2026 $ -
State Project Expenditures $ -
Local Project Expenditures $ -
$ 3,570,000.00
TOTAL WITHDRAWALS IN MAY 2026 $ -
Remaining Budget on Local Projects $ -
Remaining Budget on State Projects $ 3,570,000.00
COMMITMENTS OF CASH BALANCE:
MAY 31, 2026 - CASH BALANCE:
TOTAL FUNDS COMMITTED $ 3,570,000.00
UNCOMMITTED BALANCE: $ -
PAGE 2 OF 2
PROJECT ID
RESPONSIBLE
AGENCY
PROJECT
PHASE
INITIAL
PROGRAM
DATE
P043875 GEORGETOWN
COUNTY CON Oct-24 3,570,000.00 3,570,000.00 3,570,000.00 3,570,000.00 -
P043295 SCDOT CON Feb-24 233,800.00 233,800.00 233,800.00 233,800.00 - - -
3,803,800.00 - 3,803,800.00 233,800.00 - 233,800.00 3,570,000.00 3,570,000.00 -
3,803,800.00 - 3,803,800.00 233,800.00 - 233,800.00 3,570,000.00 3,570,000.00 -
MAY 1 BUDGET
MONTHLY
BUDGET
CHANGES
MAY 31
BUDGET
MAY 1 TOTAL
EXPENDITURES
MONTHLY
EXPENDITURES
MAY 31 TOTAL
EXPENDITURES
MAY 1
REMAINING
BUDGET
PROJECTS ON THE STATE HIGHWAY SYSTEM
GEORGETOWN CTC - MONTHLY C-FUND STATEMENT - MAY 2026 - PROVISO 118.22 FUNDS
MAY 31
BUDGET
OVERRUN
PROJECT
STATUSPROJECT DESCRIPTION
PAVING AND DRAINAGE IMPROVEMENTS - SPRING GULLY
COMMUNITY, PLAYER ST., LINCOLNSHIRE DR. ETC
MAY 31
REMAINING
BUDGET
RESURFACING OF DAVE MCKENZIE RD.
TOTAL STATE PROJECTS WITH PROVISO 118.22 FUNDS
PAGE TOTAL
DIRECTORS REPORT
JULY 23, 2026
GEORGETOWN COUNTY TRANSPORTATION COMMITTEE MEETING
P042990 Resurface Grate Ave; Brown Bark Ln; S. First St; Belair Ave; & Prince Creek Parkway
S. First St. – Project Manual/Scope of work has been drafted and sent to purchasing for bid.
P042992 Road Construction/Stormwater Drainage – Linden Cir, Tulip Tree Ct
P043160 Road Construction/Stormwater Drainage – Goodson Lp
Holt Construction is in Permitting phase. Outfall Easements have been obtained. Holt preparing documents
for bidding
P043285 Re-Rock Evert Rd
Public Works has finished this project
P043286 Re-Rock East CCC Rd
Public Works has finished this project
P043870 Road Resurfacing – Sea Dollar Dr, Riverbirch Ln, Heron Way, Sophia Ln, Meadow St, Annie
Rainey Ln, Liberty Ct
Project Complete
P043871 Road Striping/ Pavement Markers – Waterford Blvd, Clearwater Dr, Mintwood Dr, Blackberry
Ave
Project Complete
P043872 Pavement Preservation Sealcoating – Linksbrook Community
Project Complete
P043873 Grate Ave Drainage
Project Manual to be sent to Purchasing for bid.
P043874 Reconstruct Carrie Rd
Project Complete
P045073 Resurfacing of Holmes Dr, Porchester Rd, Mink Ave, Courtfield Dr,Labruce Ln, Cowhouse Ct,
Bryant Rd, Blue Moon Dr, Halfmoon Tr, Clearwater Dr, Old Waccamaw Dr, Yauhana Dr,
Wildlife Rd
Bryant, Yauhana, Wildlife Complete. Coastal is scheduling the other roads for the weeks of 7/20 & 7/27
ATTACHMENT C
P045074 Pavement Preservation Sealcoating – Simpson Lp, Rosewood Dr, Dessurency Dr, Southgate Ct
Project Complete
P045075 Drainage Improvements on Lincolnshire Dr
Waiting on obtaining easements and SCDOT approval of plans
P045076 Re-Rocking Porter Rd
Project Complete
REQUEST FOR PROGRAMMING
Program Administration
________________________ COUNTY TRANSPORTATION COMMITTEE
PROJECT FUNDING
Programming Type (Select one) Funding Source (select all that apply) Amount
New Local Projects (off State System) General Apportionment _____________
New State Project Proviso: _____________ _____________
Funding Revision Proviso: _____________ _____________
Project ID: _____________________ Proviso: _____________ _____________
PROJECT INFORMATION
Project Description (Include Road Name, Route Number and Pertinent Project Information)
Previously Budgeted Project Funding _____________
Total Budgeted Project Funding _____________
Complete for Applicable State Projects
Beginning Mile Point _________ Ending Mile Point _________ Total Mileage _________
LOCATION MAPS MUST BE INCLUDED FOR STATE PROJECTS
PROJECT MANAGEMENT
SCDOT Managed Project
Project Managed Outside SCDOT
Government Entity _________________________________________________________________
Project Manager _________________________________________________________________
Manager Title _________________________________________________________________
Email _________________________________ Telephone ___________________
Mailing Address _________________________________________________________________
City/Town ________________________ South Carolina Zip Code _______________
PROJECT AUTHORIZATION
Authorized by: ______________________________________________ Date: ______________
Chairperson, County Transportation Committee
Email Programming Request to: RawlsCL@scdot.org
or Mail Programming Request to: SCDOT
PO BOX 191
Columbia, SC 29201
Attn:
Program Administrator
ATTACHMENT D
REQUEST FOR PROGRAMMING
Program Administration
________________________ COUNTY TRANSPORTATION COMMITTEE
PROJECT FUNDING
Programming Type(Select one) Funding Source(select all that apply) Amount
New Local Projects(off State System) General Apportionment _____________
New State Project Proviso: _____________ _____________
Funding Revision Proviso: _____________ _____________
Project ID: _____________________ Proviso: _____________ _____________
PROJECT INFORMATION
Project Description(Include Road Name, Route Number and Pertinent Project Information)
Previously Budgeted Project Funding _____________
Total Budgeted Project Funding _____________
Complete for Applicable State Projects
Beginning Mile Point _________ Ending Mile Point _________ Total Mileage _________
LOCATION MAPS MUST BE INCLUDED FOR STATE PROJECTS
PROJECT MANAGEMENT
SCDOT Managed Project
Project Managed Outside SCDOT
Government Entity _________________________________________________________________
Project Manager _________________________________________________________________
Manager Title _________________________________________________________________
Email _________________________________ Telephone ___________________
Mailing Address _________________________________________________________________
City/Town ________________________ South Carolina Zip Code _______________
PROJECT AUTHORIZATION
Authorized by: ______________________________________________ Date: ______________
Chairperson, County Transportation Committee
Email Programming Request to:RawlsCL@scdot.org
or Mail Programming Request to: SCDOT
PO BOX 191
Columbia, SC 29201
Attn: Program Administrator
REQUEST FOR PROGRAMMING
Program Administration
________________________ COUNTY TRANSPORTATION COMMITTEE
PROJECT FUNDING
Programming Type(Select one) Funding Source(select all that apply) Amount
New Local Projects(off State System) General Apportionment _____________
New State Project Proviso: _____________ _____________
Funding Revision Proviso: _____________ _____________
Project ID: _____________________ Proviso: _____________ _____________
PROJECT INFORMATION
Project Description(Include Road Name, Route Number and Pertinent Project Information)
Previously Budgeted Project Funding _____________
Total Budgeted Project Funding _____________
Complete for Applicable State Projects
Beginning Mile Point _________ Ending Mile Point _________ Total Mileage _________
LOCATION MAPS MUST BE INCLUDED FOR STATE PROJECTS
PROJECT MANAGEMENT
SCDOT Managed Project
Project Managed Outside SCDOT
Government Entity _________________________________________________________________
Project Manager _________________________________________________________________
Manager Title _________________________________________________________________
Email _________________________________ Telephone ___________________
Mailing Address _________________________________________________________________
City/Town ________________________ South Carolina Zip Code _______________
PROJECT AUTHORIZATION
Authorized by: ______________________________________________ Date: ______________
Chairperson, County Transportation Committee
Email Programming Request to:RawlsCL@scdot.org
or Mail Programming Request to: SCDOT
PO BOX 191
Columbia, SC 29201
Attn: Program Administrator
REQUEST FOR PROGRAMMING
Program Administration
________________________ COUNTY TRANSPORTATION COMMITTEE
PROJECT FUNDING
Programming Type(Select one) Funding Source(select all that apply) Amount
New Local Projects(off State System) General Apportionment _____________
New State Project Proviso: _____________ _____________
Funding Revision Proviso: _____________ _____________
Project ID: _____________________ Proviso: _____________ _____________
PROJECT INFORMATION
Project Description(Include Road Name, Route Number and Pertinent Project Information)
Previously Budgeted Project Funding _____________
Total Budgeted Project Funding _____________
Complete for Applicable State Projects
Beginning Mile Point _________ Ending Mile Point _________ Total Mileage _________
LOCATION MAPS MUST BE INCLUDED FOR STATE PROJECTS
PROJECT MANAGEMENT
SCDOT Managed Project
Project Managed Outside SCDOT
Government Entity _________________________________________________________________
Project Manager _________________________________________________________________
Manager Title _________________________________________________________________
Email _________________________________ Telephone ___________________
Mailing Address _________________________________________________________________
City/Town ________________________ South Carolina Zip Code _______________
PROJECT AUTHORIZATION
Authorized by: ______________________________________________ Date: ______________
Chairperson, County Transportation Committee
Email Programming Request to:RawlsCL@scdot.org
or Mail Programming Request to: SCDOT
PO BOX 191
Columbia, SC 29201
Attn: Program Administrator
REQUEST FOR PROGRAMMING
Program Administration
________________________ COUNTY TRANSPORTATION COMMITTEE
PROJECT FUNDING
Programming Type(Select one) Funding Source(select all that apply) Amount
New Local Projects(off State System) General Apportionment _____________
New State Project Proviso: _____________ _____________
Funding Revision Proviso: _____________ _____________
Project ID: _____________________ Proviso: _____________ _____________
PROJECT INFORMATION
Project Description(Include Road Name, Route Number and Pertinent Project Information)
Previously Budgeted Project Funding _____________
Total Budgeted Project Funding _____________
Complete for Applicable State Projects
Beginning Mile Point _________ Ending Mile Point _________ Total Mileage _________
LOCATION MAPS MUST BE INCLUDED FOR STATE PROJECTS
PROJECT MANAGEMENT
SCDOT Managed Project
Project Managed Outside SCDOT
Government Entity _________________________________________________________________
Project Manager _________________________________________________________________
Manager Title _________________________________________________________________
Email _________________________________ Telephone ___________________
Mailing Address _________________________________________________________________
City/Town ________________________ South Carolina Zip Code _______________
PROJECT AUTHORIZATION
Authorized by: ______________________________________________ Date: ______________
Chairperson, County Transportation Committee
Email Programming Request to:RawlsCL@scdot.org
or Mail Programming Request to: SCDOT
PO BOX 191
Columbia, SC 29201
Attn: Program Administrator
REQUEST FOR PROGRAMMING
Program Administration
________________________ COUNTY TRANSPORTATION COMMITTEE
PROJECT FUNDING
Programming Type(Select one) Funding Source(select all that apply) Amount
New Local Projects(off State System) General Apportionment _____________
New State Project Proviso: _____________ _____________
Funding Revision Proviso: _____________ _____________
Project ID: _____________________ Proviso: _____________ _____________
PROJECT INFORMATION
Project Description(Include Road Name, Route Number and Pertinent Project Information)
Previously Budgeted Project Funding _____________
Total Budgeted Project Funding _____________
Complete for Applicable State Projects
Beginning Mile Point _________ Ending Mile Point _________ Total Mileage _________
LOCATION MAPS MUST BE INCLUDED FOR STATE PROJECTS
PROJECT MANAGEMENT
SCDOT Managed Project
Project Managed Outside SCDOT
Government Entity _________________________________________________________________
Project Manager _________________________________________________________________
Manager Title _________________________________________________________________
Email _________________________________ Telephone ___________________
Mailing Address _________________________________________________________________
City/Town ________________________ South Carolina Zip Code _______________
PROJECT AUTHORIZATION
Authorized by: ______________________________________________ Date: ______________
Chairperson, County Transportation Committee
Email Programming Request to:RawlsCL@scdot.org
or Mail Programming Request to: SCDOT
PO BOX 191
Columbia, SC 29201
Attn: Program Administrator
REQUEST FOR PROGRAMMING
Program Administration
________________________ COUNTY TRANSPORTATION COMMITTEE
PROJECT FUNDING
Programming Type(Select one) Funding Source(select all that apply) Amount
New Local Projects(off State System) General Apportionment _____________
New State Project Proviso: _____________ _____________
Funding Revision Proviso: _____________ _____________
Project ID: _____________________ Proviso: _____________ _____________
PROJECT INFORMATION
Project Description(Include Road Name, Route Number and Pertinent Project Information)
Previously Budgeted Project Funding _____________
Total Budgeted Project Funding _____________
Complete for Applicable State Projects
Beginning Mile Point _________ Ending Mile Point _________ Total Mileage _________
LOCATION MAPS MUST BE INCLUDED FOR STATE PROJECTS
PROJECT MANAGEMENT
SCDOT Managed Project
Project Managed Outside SCDOT
Government Entity _________________________________________________________________
Project Manager _________________________________________________________________
Manager Title _________________________________________________________________
Email _________________________________ Telephone ___________________
Mailing Address _________________________________________________________________
City/Town ________________________ South Carolina Zip Code _______________
PROJECT AUTHORIZATION
Authorized by: ______________________________________________ Date: ______________
Chairperson, County Transportation Committee
Email Programming Request to:RawlsCL@scdot.org
or Mail Programming Request to: SCDOT
PO BOX 191
Columbia, SC 29201
Attn: Program Administrator
REQUEST FOR PROGRAMMING
Program Administration
________________________ COUNTY TRANSPORTATION COMMITTEE
PROJECT FUNDING
Programming Type(Select one) Funding Source(select all that apply) Amount
New Local Projects(off State System) General Apportionment _____________
New State Project Proviso: _____________ _____________
Funding Revision Proviso: _____________ _____________
Project ID: _____________________ Proviso: _____________ _____________
PROJECT INFORMATION
Project Description(Include Road Name, Route Number and Pertinent Project Information)
Previously Budgeted Project Funding _____________
Total Budgeted Project Funding _____________
Complete for Applicable State Projects
Beginning Mile Point _________ Ending Mile Point _________ Total Mileage _________
LOCATION MAPS MUST BE INCLUDED FOR STATE PROJECTS
PROJECT MANAGEMENT
SCDOT Managed Project
Project Managed Outside SCDOT
Government Entity _________________________________________________________________
Project Manager _________________________________________________________________
Manager Title _________________________________________________________________
Email _________________________________ Telephone ___________________
Mailing Address _________________________________________________________________
City/Town ________________________ South Carolina Zip Code _______________
PROJECT AUTHORIZATION
Authorized by: ______________________________________________ Date: ______________
Chairperson, County Transportation Committee
Email Programming Request to:RawlsCL@scdot.org
or Mail Programming Request to: SCDOT
PO BOX 191
Columbia, SC 29201
Attn: Program Administrator
ATTACHMENT E
Type text here