County Council Meeting — Agenda Packet
Georgetown County · Georgetown County · County Council · meeting of May 12, 2026 · Agenda packets
Open the original document More from Georgetown County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
District 1: Clint A. Elliott, Chairman
District 2: Bob Anderson
District 3: Rev. Ernie Cooper
District 4: Ron J. Charlton
District 5: Raymond L. Newton
District 6: Stella Mercado, Vice Chair
District 7: Louis R. Morant
County Administrator
Angela Christian
Clerk to Council
Alma D. Sierra
County Attorney
John D. Watson
May 12, 2026 5:30 PM
GEORGETOWN COUNTY COUNCIL
County Council Chambers
129 Screven Street, Suite 213
Georgetown, SC 29440
Agenda
1. INVOCATION
2. PLEDGE OF ALLEGIANCE
3. APPROVAL OF AGENDA
4. SPECIAL REPORTS / PRESENTATIONS
4a Nonprofit Spotlight -- Amazing Journey
4b 250 American Revolution Committee
4c Employee of the Quarter Recognition
4d Innovation Award Presentation
4e Proclamation No. 26-12 Proclaiming May 17–23, 2026, as EMS Week in Georgetown
County
4f Proclamation No. 26-13 Proclaiming May 17-23, 2026 Public Works Week in
Georgetown County
Page 1 of 253
5. PUBLIC COMMENTS
6. CONSENT AGENDA
6a Procurement #26-012, FY26 Municipal Lease/ Purchase Financing for Vehicles and
Heavy Equipment
6b Byrne JAG Funding Grant
6c Task Order #2 to Contract #25-094, Airport Engineering Services for Apron
Reconstruction
6d Procurement #26-021, Andrews Gymnasium Floor Replacement
6e Procurement #26-033, Choppee Window Replacement
7. PUBLIC HEARINGS
7a Ordinance No. 26-12 - AUTHORIZING THE ISSUANCE AND SALE OF NOT EXCEEDING
$25,000,000 GENERAL OBLIGATION BONDS, IN ONE OR MORE YEARS, IN ONE OR
MORE SERIES, WITH APPROPRIATE SERIES DESIGNATIONS, AND THE ISSUANCE OF
GENERAL OBLIGATION BOND ANTICIPATION NOTES, IN ONE OR MORE YEARS, IN
ONE OR MORE SERIES, WITH APPROPRIATE SERIES DESIGNATIONS, BY
GEORGETOWN COUNTY, SOUTH CAROLINA; PROVIDING FOR THE FORM OF THE
BONDS AND NOTES; FIXING CERTAIN DETAILS OF THE BONDS AND NOTES;
AUTHORIZING THE COUNTY ADMINISTRATOR OR HIS LAWFULLY-AUTHORIZED
DESIGNEE TO DETERMINE CERTAIN MATTERS RELATING TO THE BONDS AND
NOTES; PROVIDING FOR THE PAYMENT OF THE BONDS AND NOTES AND THE
DISPOSITION OF THE PROCEEDS THEREOF; AND OTHER MATTERS RELATING
THERETO.
8. THIRD READING OF ORDINANCES
8a Ordinance No. 26-12 - AUTHORIZING THE ISSUANCE AND SALE OF NOT EXCEEDING
$25,000,000 GENERAL OBLIGATION BONDS, IN ONE OR MORE YEARS, IN ONE OR
MORE SERIES, WITH APPROPRIATE SERIES DESIGNATIONS, AND THE ISSUANCE OF
GENERAL OBLIGATION BOND ANTICIPATION NOTES, IN ONE OR MORE YEARS, IN
ONE OR MORE SERIES, WITH APPROPRIATE SERIES DESIGNATIONS, BY
Page 2 of 253
GEORGETOWN COUNTY, SOUTH CAROLINA; PROVIDING FOR THE FORM OF THE
BONDS AND NOTES; FIXING CERTAIN DETAILS OF THE BONDS AND NOTES;
AUTHORIZING THE COUNTY ADMINISTRATOR OR HIS LAWFULLY-AUTHORIZED
DESIGNEE TO DETERMINE CERTAIN MATTERS RELATING TO THE BONDS AND
NOTES; PROVIDING FOR THE PAYMENT OF THE BONDS AND NOTES AND THE
DISPOSITION OF THE PROCEEDS THEREOF; AND OTHER MATTERS RELATING
THERETO.
8b Ordinance No. 26-13 — AN ORDINANCE TO AMEND ORDINANCE 2021-05 AND TO
RATIFY, AUTHORIZE, REALLOCATE, AND APPROVE EXPENDITURES UNDER CAPITAL
SALES TAX REVENUES FOR COMMUNITY PROJECTS
9. SECOND READING OF ORDINANCES
9a Ordinance No. 26-14 - An Ordinance to Make Appropriations for Ordinary County
Purposes for Georgetown County for the Fiscal Year Beginning July 1, 2026, and
Ending June 30, 2027; to Provide for the Expenditure Thereof, to Provide for
Revenues for the Payment Thereof, as well as adjustments to various fee schedules
10. FIRST READING OF ORDINANCES
10a Ordinance No. 26-15– to rezone two (2) parcels totaling approximately 90.21 acres
located on the western side of Brick Chimney Road, approximately 678 feet north
of Highmarket Street in Georgetown from Forest Agriculture (FA) and Limited
Industrial (LI) to a Planned Development (PD). TMS#s 02-0422-011-10-02 and 02-
0422-011-08-00. Council District 5
10b Ordinance No. 26-16 — An ordinance to amend Article VIII, Section 809, and Article XII,
Section 1206, of the Georgetown County Zoning Ordinance, and to create a new Article
XXIV entitled Wetland Protection Ordinance (WPO).
10c Ordinance No. 26-17 - Amendment of the FY2025-2026 Budget Ordinance
10d Ordinance No. 26-18 — An Ordinance to Amend Ordinance 2021-05 and to Ratify,
Authorize, Reallocate, and Approve Expenditures of Capital Sales Tax Revenues for
Community Projects
11. APPROVAL OF MINUTES
Page 3 of 253
11a Regular Council Meeting - April 21, 2026
12. DEFERRED OR PREVIOUSLY SUSPENDED ISSUES
12a Ordinance No. 25-13 - An Ordinance to amend Ordinance No. 20-59 pertaining to
Georgetown County Council's Rules of Procedure
13. LEGAL BRIEFING / EXECUTIVE SESSION
13a Executive session — To discuss personnel matters pursuant to S.C. Code Ann § 30-
4-70(a)(1), in accordance with the procedures of § 30-4-70(b), with the
understanding that upon returning to open session, the Council may take a vote on
any matters discussed.
13b To discuss negotiations incident to a proposed contractual arrangement and
economic development project, and receipt of legal advice, pursuant to S.C. Code
Ann § 30-4-70(a)(5), in accordance with the procedures of § 30-4-70(b), with the
understanding that upon returning to open session, the Council may take a vote on
any matters discussed.
13c To discuss legal matters related to pending litigation pursuant to S.C. Code Ann §
30-4-70(a)(2), in accordance with the procedures of § 30-4-70(b), with the
understanding that upon returning to open session, the Council may take a vote on
any matters discussed.
14. OPEN SESSION
15. ADJOURNMENT
Page 4 of 253
Georgetown County Employee
of the Quarter Nomination Form
Employee’s name: Sara Viafara-Marin
Department/Division: Georgetown County Fire & EMS
Number of Years Employed With County: 1 Hire date: December 9, 2024
Current Job Title (and previous titles where relevant):
Firefighter/EMT
What does this employee’s job description entail?
Firefighter/EMT Sara Viafara-Marin began her career with Georgetown County Fire & EMS on
December 9, 2024, joining the department as a firefighter recruit. From the start, she demonstrated an
exceptional commitment to personal and professional growth, quickly earning both her IFSAC Firefighter
and NREMT-B certifications. Since that time, Sara has become a constant and valued presence within the
department, someone her peers look forward to working alongside each shift. Known for her bright,
positive, and energetic attitude, she brings contagious enthusiasm to every call and every training session.
Her willingness to step up, learn, and take on new challenges has set a strong example for others to
follow. When the opportunity arose to pursue NREMT-Advanced certification, Sara was the first to
volunteer, reflecting her dedication to continuous improvement and her commitment to bringing
forward-thinking change to Georgetown County Fire & EMS. Her work ethic, motivation, and
unwavering positivity embody the very qualities this award seeks to recognize. Firefighter/EMT
Viafara-Marin is the type of employee every department hopes to have—driven, dependable, and
inspiring. She not only represents the best of Georgetown County Fire & EMS, but also serves as a role
model for others to emulate.
On an attached sheet and using specific examples, please explain why this employee should be named
Employee of the Quarter. This narrative should be no more than one page in length and may include, but
is not limited to:
Goals/objectives the employee has completed, especially in the last quarter;
Committees served on and/or volunteer service to the county;
Ways the employee has demonstrated initiative and enthusiasm at work;
Certifications, licenses, etc.;
Details about the quality of the employee’s work, knowledge of the job and department, etc.;
Details about how the employee interacts with others, including customers and coworkers.
_____________________________ ___________________
Director/Elected Official’s Signature Date
Page 5 of 253
Page 6 of 253
Page 7 of 253
Innovating Voter Education in Georgetown County
The Georgetown County Voter Guide
Process/Project Description & Justification for Innovation Award
The Georgetown County Voter Guide is a comprehensive, nonpartisan educational resource developed to
address a critical gap in voter understanding and access to clear, centralized election information.
This project was initiated, designed, and implemented internally by the Georgetown County Voter
Registration and Elections Office to improve voter preparedness, reduce confusion, and enhance trust in
the electoral process.
This initiative directly aligns with the Innovation Award criteria by being employee-driven, solving a defined
problem, and delivering a completed, measurable solution.
Problem Identified
Voters—particularly first-time voters and those unfamiliar with election procedures—often face confusion
regarding:
• Where and how to vote
• Differences between early voting, absentee voting, and Election Day voting
• Identification requirements
• Ballot structure and expectations
This lack of clarity can lead to longer lines, increased staff workload, voter frustration, and reduced
confidence in the process.
Employees Involved in Process or Project Completion
Aphra McCrea, Director of Voter Registration and Elections
Georgetown County Voter Registration and Elections Office Board Members
Timeframe to Complete the Process
The Georgetown County Voter Guide was developed over a multi-phase timeline beginning in early 2025 and
completed prior to the June 9, 2026 Primary Election.
Planning & Content Development: Early 2025
Design & Review: Early 2025
Finalization & Distribution: July 2025
This timeline allowed for careful development, internal review, and timely distribution to ensure voters had
access to accurate information ahead of the election cycle.
Page 8 of 253
Innovative Solution
The Georgetown County Voter Guide was created as a single, easy-to-understand, reader-friendly resource
that consolidates all essential election information into one accessible format.
Key innovative elements include:
• Plain-language explanations (reducing government jargon)
• Visual layouts to improve comprehension
• Step-by-step guidance through the voting process
• Centralized information replacing multiple fragmented sources
• Designed for both digital and print distribution to maximize reach
Enhancement to County Government
This project significantly enhances county operations and public service by:
• Improving efficiency: Reduces repetitive voter inquiries and staff workload
• Increasing voter confidence: Promotes transparency and understanding of election processes
• Strengthening public trust: Clearly communicates how elections are conducted
• Enhancing accessibility: Makes critical information easier for all voters to understand, including new and
infrequent voters
Cost Effectiveness & Impact
The Voter Guide was developed using existing staff, tools, and resources, making it a low-cost,
high-impact solution. Its ability to streamline communication and reduce confusion results in operational
savings over time.
Why This Deserves the Innovation Award
The Georgetown County Voter Guide exemplifies innovation through:
• Proactive problem-solving
• Improved service delivery to the public
• Increased operational efficiency
• A replicable model that could benefit other counties
It transforms how election information is communicated—moving from fragmented, technical messaging to
a clear, unified, and voter-centered approach.
Page 9 of 253
Page 10 of 253
STATE OF SOUTH CAROLINA ) MAY 17-23, 2026
) EMERGENCY MEDICAL SERVICES WEEK
COUNTY OF GEORGETOWN )
To designate the Week of May 17-23, 2026, as Emergency Medical Services Week
WHEREAS, emergency medical services is a vital public service; and
WHEREAS, the members of emergency medical services teams are ready to provide lifesaving
care to those in need 24 hours a day, seven days a week; and
WHEREAS, access to quality emergency care dramatically improves the survival and recovery
rate of those who experience sudden illness or injury; and
WHEREAS, the emergency medical services system consists of emergency physicians,
emergency nurses, emergency medical technicians, paramedics, firefighters, educators,
administrators and others; and
WHEREAS, the members of emergency medical services teams, whether career or volunteer,
engage in thousands of hours of specialized training and continuing education to enhance their
lifesaving skills; and
WHEREAS, it is appropriate to recognize the value and the accomplishments of emergency
medical services providers by designating Emergency Medical Services Week; and
WHEREAS, the Georgetown County Council and the Emergency Medical Services of
Georgetown County are reaching out to citizens of Georgetown County to recognize Emergency
Medical Services workers for their selfless dedication to providing care to the sick and injured;
and
WHEREAS, the theme for EMS Week shall be “Improving Outcomes, Together”.
NOW THEREFORE BE IT PROCLAIMED that the Georgetown County Council, along with
the Emergency Medical Services of Georgetown County, proclaim the week of May 17-23, 2026,
as
“EMERGENCY MEDICAL SERVICES WEEK”
ADOPTED THIS 12TH DAY OF MAY 2026
___________________________
Clint Elliott, Chairman
Georgetown County Council
ATTEST:
______________________
Alma D. Sierra
Page 11 of 253
Clerk to Council
Page 12 of 253
National Public Works Week Proclamation
May 17–23, 2026
“Rooted in Service, Powered by Community”
WHEREAS, public works professionals focus on infrastructure, facilities, and services that are of vital
importance to sustainable and resilient communities and to public health, high quality of life, and
well-being of the people of Georgetown County; and,
WHEREAS, these infrastructure, facilities, and services could not be provided without the dedicated efforts of public works
professionals, who are engineers, managers, and employees at all levels of government and the private sector, who are
responsible for rebuilding, improving, and protecting our nation’s transportation, water supply, water treatment and solid
waste systems, public buildings, and other structures and facilities essential for our citizens; and,
WHEREAS, it is in the public interest for the citizens, civic leaders, and children in Georgetown County to gain knowledge
of and maintain an ongoing interest and understanding of the importance of public works and public works programs in
their respective communities; and,
WHEREAS, the year 2026 marks the 66th annual National Public Works Week sponsored by the American Public Works
Association, be it now,
RESOLVED, I, Councilman Clint A. Elliott, do hereby designate the week of May 17–23, 2026, as “National Public Works
Week”. I urge all citizens to join with representatives of the American Public Works Association and government agencies
in activities, events, and ceremonies designed to pay tribute to our public works professionals, engineers, managers, and
employees, and to recognize the substantial contributions they make to protecting our national health, safety, and
advancing quality of life for all.
Adopted at the Georgetown County Council Chambers, South Carolina on this IN WITNESS WHEREOF, I have hereunto set
my hand and caused the Seal of the State (to be affixed),
DONE at the Georgetown, South Carolina this ________ day of ________ 2026.
_________________________________________
Clint A. Elliott
Georgetown County Council Chairman
ATTEST:
Page 13 of 253
_________________________________________
Alma D. Sierra
Clerk to Council
Page 14 of 253
Page 15 of 253
STATE OF SOUTH CAROLINA ) RESOLUTION #26-12
) APPROVING FINANCING TERMS
COUNTY OF GEORGETOWN )
WHEREAS: Georgetown County (“County”) has previously determined to undertake a project for
Equipment Lease Purchase , and the Finance Officer has now presented a proposal for the financing of such
Project.
BE IT THEREFORE RESOLVED, as follows:
1. The County hereby determines to enter into an Equipment Lease Purchase Agreement,
through TD Equipment Finance (Lender), in accordance with the ir proposal dated April 2 2 2026. The
amount of funds financed shall not exceed $9.0 million. The annual interest rates (in the absence of default or
change in tax status) and financing terms shall not exceed:
2. All financing contr acts and all related documents for the closing of the financing (the
“Financing Documents”) shall be consistent with the foregoing terms. All officers and employees of the
County are hereby authorized and directed to execute and deliver any Financing Docum ents, and to take all
such further action as they may consider necessary or desirable, to carry out the financing of the Project as
contemplated by the proposal and this resolution. The Financing Documents shall include a Financing
Agreement and an Escrow Agreement as TD Equipment Finance may request.
3. The Finance Officer is hereby authorized and directed to hold executed copies of the
Financing Documents until the conditions for the delivery of the Financing Documents have been completed to
such officer's satisfaction. The Finance Officer is authorized to approve changes to any Financing Documents
previously signed by County officers or employees, provided that such changes shall not substantially alter the
intent of such documents or certificates from the intent expressed in the forms executed by such officers. The
Financing Documents shall be in such final forms as the Finance Officer shall approve, with the Finance
Officer’s release of any Financing Document for delivery constituting conclusive evide nce of such officer's
final approval of the Document’s final form.
4. The County shall not take or o mit to take any action the taking or omission of which shall
cause its interest payments on this financing to be includable in the gross income for feder al income tax
purposes of the registered owners of the interest payment obligations. The County hereby designates its
obligations to make principal and interest payments under the Financing Documents as “qualified tax -exempt
obligations” for the purpose of Internal Revenue Code Section 265(b)(3).
5. The County intends that the adoption of this resolution will be a declaration of the County’s
official intent to reimburse expenditures for the equipment that is to be financed from the proceeds of the TD Lease
Finance financing described above. The County intends that funds that have been advanced, or that may be
advanced, from the County’s general fund, or any other fund related to the equipment, for equipment costs may be
reimbursed from the financing proceeds.
6. All prior actions of County officers in furtherance of the purposes of this resolution are
hereby ratified, approved and confirmed. All other resolutions (or parts thereof) in conflict with this resolution
are hereby repealed, to the extent of the conflict. This resolution shall take effect immediately.
Adopted this 12th day of May 2026.
SEAL
By: ______________________________ By: ________________________________
Clerk to County Council Chairman, County Council
Georgetown County, South Carolina Georgetown County, South Carolina
Term Bank Qualified Rate
4 years
6 years
10 years
3.66%
3.63%
3.87%
Page 16 of 253
Item Number: 6b
Meeting Date: 5/12/2026
Item Type:Consent Agenda
Agenda Request Form
Georgetown County Council
DEPARTMENT: County Council
ISSUE UNDER CONSIDERATION:
Byrne JAG Funding Grant
CURRENT STATUS:
The Georgetown County Sheriff’s Office respectfully requests funding under the FY25 Edward
Byrne Memorial Justice Assistance Grant (JAG) Program to support the acquisition of critical
equipment and training resources that will strengthen our crime scene investigation capabilities,
improve forensic evidence preservation, and enhance deputy readiness through realistic,
scenario-based training.The requested funding will provide essential tools and resources that
directly impact our ability to investigate crimes effectively, preserve critical evidence, and
deliver justice to victims
POINTS TO CONSIDER:
The Georgetown County Sheriff’s Office is responsible for responding to a wide range of
criminal investigations, including violent crimes and sexual assaults. As case complexity
increases, so does the need for reliable equipment, proper evidence handling, and advanced
training environments. Currently, gaps in lighting capability, limited hands-on training
infrastructure, and insufficient cold storage for biological evidence present operational risks that
may affect investigative quality and case outcomes.
Proposed Purchases
1. Portable Crime Scene Lighting Kits
Funding will support the acquisition of high-intensity, portable lighting systems to ensure proper
scene illumination during nighttime and low-visibility conditions. These kits will enable
investigators to identify, document, and collect evidence with greater accuracy, reducing the
likelihood of missed or compromised evidence and strengthening prosecutorial success.
The Sheriff’s Office Criminal Investigative Division gets called out to an average of 75 crime
scenes each year that require enhanced lighting to be properly processed. The agency currently
has four DeWalt battery-operated units that have proven vital in attaining comprehensive
evidence collection, photography, and reconstruction. Two of these lighting units are reaching
their end of life, so we are hoping to purchase two new battery-operated area light kits. These
Page 17 of 253
new units are lighter, the lights themselves stay cooler, their batteries last longer, and they offer
some advances in their swivel fixtures, helping us to better position the lighting as needed.
2. Mobile Training Modular Sectional House
We propose the purchase of a mobile, modular training structure designed to simulate residential
environments. This resource will allow personnel to conduct realistic, scenario-based training for
crime scene processing, including violent crime and domestic incident simulations. The ability
to repeatedly train in a controlled yet realistic setting will improve technical proficiency,
reinforce best practices, and increase overall effectiveness.
The Sheriff’s Office SWAT and Crime Suppression Units conduct “shoot house” training every
month to rehearse clearing rooms, responding to armed suspects, hostage rescue, and navigating
tight indoor spaces. It is vital to build their capability to work as a team and improve decision-
making in stressful, often chaotic situations. Our agency has never had a modular training
structure, so we make use of empty houses and school gyms. It is not ideal because options are
limited, some structures aren’t sound throughout, and although neighbors are notified, it can still
be jarring to see SWAT in training next door.
The outlay from this grant will allow us to purchase the first phase of our modular training
building plans. It will be fully functional as is, but we hope to add more units to make it even
more dynamic in the future. We are in the process of building a multi-agency law enforcement
training facility on the campus of our new Detention Center. SWAT training in the new modular
training house can take place onsite and benefit agencies throughout the region.
3. Dedicated Evidence Refrigerator for Sexual Assault Kits
Funding will also support a secure, temperature-controlled evidence refrigerator specifically
designated for the storage of sexual assault kits. Proper refrigeration is essential to preserve
biological evidence and maintain DNA integrity. This investment will ensure compliance with
evidence handling standards, protect the chain of custody, and support victim-centered
investigations by safeguarding critical forensic materials.
The Georgetown County Sheriff’s Office Evidence Department is responsible for the storage of
biological evidence for all criminal sexual conduct cases in Georgetown County. Although the
number of cases fluctuates year to year — our agency saw ten cases with a solve rate of 90% in
2025 and 26 cases with a solve rate of 20% in 2024 — the evidence for all unsolved or pre-
adjudicated cases remains in our care and control in perpetuity.
Our department currently has one smaller, controlled-access refrigeration unit devoted to sexual
assault kits and one smaller unit devoted to other biological and perishable trace evidence.
Purchase of a larger, secure refrigerator specifically designated for storage of sexual assault kits
would greatly lessen the strain on our evidence safeguarding capabilities.
Goals and Outcomes
The primary goals of this project are to:
- Improve the accuracy and thoroughness of crime scene investigations
- Enhance preservation and reliability of forensic evidence
Page 18 of 253
- Increase officer competency through hands-on, scenario-based training
- Strengthen case outcomes and prosecutorial effectiveness
Expected outcomes include improved evidence quality, reduced risk of contamination or
degradation, increased training frequency and realism, and enhanced overall investigative
performance.
JAG Program Alignment
This request aligns with the core purpose of the Edward Byrne Memorial Justice Assistance
Grant (JAG) by supporting law enforcement initiatives that improve public safety, enhance
criminal justice operations, and promote evidence-based practices. The proposed investments
fall within allowable JAG purpose areas, including law enforcement equipment, training, and
forensic improvements.
Additionally, we attest that we will demonstrate: 1) proper inventory and maintenance of the
new equipment, 2) the enduring utility of these new items and 3) our dedication to fulfilling all
grant performance measures. Specifically, we will:
● Add and track all equipment in agency property control software (Procurement)
● Track times used and efficacy of mobile lighting (CID Lieutenant)
● Track number of kits added to refrigeration (Evidence Custodian)
● Track use and efficacy of mobile training house (SWAT Commander)
● All results will be shared in Performance Reports (grant manager)
FINANCIAL IMPACT:
OPTIONS:
STAFF RECOMMENDATIONS:
The Georgetown County Sheriff’s Office recommends their approval to apply for the grant that
supports the acquisition of critical equipment and training resources.
ATTORNEY REVIEW:
No
ATTACHMENTS:
1. Grant Pre-Application Approval FED Byrne JAG 26
2. BUDGET GCSO FY25 JAG
Page 19 of 253
County Admin’s Approval to Apply for Grant
The Director/Elected Official whose Division the grant would fall under should complete and
sign this form and send it to the County Administrator. The purpose of this form is to provide
the County Administrator time to consider what the financial impact of a proposed grant would
be on the County’s budget AND what the workload impact of the proposed grant would be on
other County’s departments…BEFORE any time is spent on completing a grant application. If
the County Administrator signs this form, the County’s Grants department will then scan/email
this form to the individuals specified at the bottom of this form as needing to know about plans
for applying for this grant so that they can relay their concerns ASAP to the County
Administrator and to the Director/Elected Official. Attach supporting documents that describe
the grant more fully to provide a clear understanding of the scope of what is being considered.
Name of Grantor: United States Department of Justice
Name of Grant being applied for: Byrne JAG Funding
Description of what the grant is for and how the grant will benefit the County: This
grant allows us to purchase needed equipment at a per capita allotment. We are asking for
funding for 1) forensic crime scene lighting, 2) a refrigeration unit for SA kits, and 3) a
modular training system (a tactical training house that can be reconfigured)
Deadline date for filing the grant application: April 21, 2026
Grant $ Amount being applied for: $14,017
Percentage and Dollar Amount of Required County Match: $0
Anticipated Grant Beginning Date: October 1, 2026
Please circle either YES or NO as to whether your understanding of the scope of the
proposed grant might impact either the budget or the workload of the staff of the depts listed
below.
Should we scan this form to the following? We will scan this form to:
YES or NO … Public Services Director * Purchasing Officer
YES or NO … MIS Director
* Finance Director
YES or NO … Human Resources Director
YES or NO … Projects Engineer Others who should get this form?____________________
This form was completed by:
Director/Elected Official:
Date: April 7, 2026
Date: April 7, 2026
*******************************************************************
County Administrator:_____________________________________Date_______________
Form Revised on 5-16-2011
Page 20 of 253
Georgetown County Sheriff’s Office
BJA FY25 Local JAG
O-BJA-2025-172542
SI-172542
BUDGET
Portable lighting for investigative work at crime scenes, a controlled access refrigeration
unit for sexual assault kits, and a mobile modular training house.
● Formula grant with a $14,017 cap
● No match requirement
● Prices below reflect estimated taxes and shipping from US bidders.
ITEMS:
Portable Lighting Kit (2) $795
Secure refrigeration unit (1) $1915
Mobile Modular Training House (1) $11,275
___________
TOTAL: $13,985
Page 21 of 253
• GEORGETOWN COUNTY, SOUTH CAROLINA . TASK ORDER INCLUDING TASK ORDER MODIFICATIONS FORM
CONTRACT# •. 25-094 PO#·. 2026-00000514 #2Apron Rocon
Project/Pin#: ____ _
VENDoRNAME: Ardurra Group INC.
coNTRACTNAME: Airport Engineering & P lanning Services
PRoJEcTITAsKORDERNAME: Apron Reconstruction Construction Phase
PRoJEcTLocATION: Georgetown County Airport
GL ACCOUNT NUMBER: 99588. 609-50431
TASKORDERAM0UNT: $ -----------
JUSTIFICATION FOR TASK ORDER WORK:
Modifiying our previous engineers plans to get the project to bid before June 1st.
Then taking over the project from bidding to finish.
SCOPE OF WORK/ DELIVERABLES:
Project Management, Design, Bidding, Construction Administration, Construction
Management Plan, As-Built Drawings, Grant Services, RPR Services
(sub-consultant), QA Testing.
LIST SUB-CONSULT ANTS (ORN/ A IF NOT APPLICABLE):
S&ME
START DATE: ------
NUMBER OF DAYS FOR COMPLETION: 300 DAYS -----
LIQUIDATED DAMAGES AMOUNT: $0 ------
couNTY DEPT. PERSONNEL REQUESTING CHANGE: Jim Taylor
COUNTY DIRECTOR APPROVAL: �-*��Kl:-. -,,�
,...
__,,,_�--/�-/A_,--�----_-)-_ --
Form #300, Rev. I 2/13//2024
347,871.05
5/13/2026
Page 22 of 253
Form #300, Rev. 12/13//2024
THE PURPOSE OF THIS TASK ORDER IS TO ACT AS THE FIRM ’S NOTICE TO PROCEED FOR THE ABOVE
WORK. T HE START AND COMPLETION TIMES LISTED ABOVE WILL BE USED FOR DETERMINING THE
APPLICABILITY OF THE ASSIGNED LIQUIDATED DAMAGES . NO OTHER CHANGES ARE ALLOWABLE BY
ISSUANCE OF THIS TASK ORDER . ANY CHANGES TO CONTRACT TERMS AND CONDITIONS , HOURLY
RATES, ETC. SHALL REMAIN UNCHANGED UNLESS BILATERALLY APPROVED BY A SEPARATE LY SIGNED
CONTRACT AMENDMENT.
NOT VALID UNTIL SIGNED BY ALL PARTIES BELOW:
VENDOR (FIRM NAME): _________________________________
PRINTED NAME & TITLE:
_________________________________
SIGNATURE: _____________________________________________
DATE: ________________
GEORGETOWN COUNTY
ANGELA CHRISTIAN, COUNTY ADMINISTRATOR
SIGNATURE: _________________________________
DATE: ________________
FOR TASK ORDER MODIFICATIONS ONLY: PRIOR TASK ORDER #: _______________
PRIOR TASK ORDER PROJECT BALANCE: $________________________
TOTAL PROJECT AMOUNT INCLUDING THIS TASK ORDER: $________________________
FOR PROCUREMENT USE ONLY:
TASK ORDER #: _______________
A) IDC CONTRACT SUM PRIOR TO THIS TASK ORDER: $________________________
B) AMOUNT OF THIS TASK ORDER: $________________________
C) NEW IDC CONTRACT TOTAL (A+B): $________________________
2
3,750.00
347,871.05
351,621.05
Page 23 of 253
Page 24 of 253
Page 25 of 253
Page 26 of 253
Page 27 of 253
Page 28 of 253
Page 29 of 253
Page 30 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE TASK DESCRIPTION LABOR EXPENSES SUB TOTAL
01 01 Project Management $18,806.00 $0.00 $0.00 $18,806.00
02 01 Design Services $29,772.00 $845.35 $0.00 $30,617.35
03 01 Bidding $12,808.00 $1,291.25 $0.00 $14,099.25
04 01 Construction Administration $69,013.00 $2,158.95 $0.00 $71,171.95
05 01 Construction Management Plan $6,352.00 $0.00 $0.00 $6,352.00
06 01 As-Built Drawings $5,096.00 $0.00 $0.00 $5,096.00
07 01 Grant Services $8,982.00 $0.00 $0.00 $8,982.00
08 01 Construction Observation/Resident Project Representative $105,710.00 $16,236.50 $0.00 $121,946.50
09 01 Quality Assurance Testing $5,800.00 $0.00 $65,000.00 $70,800.00
TOTALS: $262,339.00 $20,532.05 $65,000.00 $347,871.05
COSTS
GRAND TOTAL
SUMMARY OF COSTS
$347,871.05
ATTACHMENT B - Manpower Estimate
Page 31 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
Project Management
DIRECT LABOR
1 Project Management
Project Formulation with Owner, FAA, SCAC 16 16
Routine Management Tasks (Invoicing, Schedule, Resources, Team Mtgs) 40 20 6 66
Task Subtotals 56 20 0 6 0 0 82
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $244.00 $210.00 $173.00 $157.00 $126.00 $88.00
Labor Subtotals $13,664.00 $4,200.00 $0.00 $942.00 $0.00 $0.00 $18,806.00
Included Profit $2,796.20
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Travel (250 Miles Roundtrip from Columbia to GGE) 0 Miles $0.725 $0.00
2 Xerox Copies (8.5"x11") 0 Each $0.12 $0.00
3 Xerox Copies (11"x17") 0 Each $0.20 $0.00
4 Xerox Copies (22"x34") 0 Each $5.00 $0.00
5 USPS/UPS Postage 0 Each $50.00 $0.00
$0.00
ATTACHMENT B - Manpower Estimate
TASK NO.
Employee Classifications
Senior Project
Manager
Sr. Aviation
Engineer Senior Designer Designer 2 Designer 1 Admin
Direct Expense Subtotal
TOTAL $18,806.00
Page 32 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
Design Services
DIRECT LABOR
2 Prepare Revised IFB Plan Drawings, Specs, Contract Documents
Site Visit to Verify Pre-Construction Conditions 8 8 8 24
Re-Package Previous Plan Drawings (Minor Revisions) 2 4 6
Re-Design Mid-field Connector Taxilane
Grading Design 1 2 12 15
Construction Safety and Phasing Plan and Report2 8 8 18
Existing Conditions and Demolition Plan0.5 0.5 4 5
Survey Layout Plan 0.5 0.5 4 5
Grading and Paving Plan0.5 0.5 4 5
Typical Sections and Miscellaneous Details0.5 0.5 4 5
Sediment and Erosion Control Plan0.5 0.5 2 3
Lighting Layout and Circuit Plan (Not Included in Scope) 0
Pavement Markings and Tie-down Plan0.5 0.5 2 3
Cross Sections 0.5 4 5
Quantity Calculations and Final Engineer's Estimate 1 4 8 13
Prepare Revised Project Manual including Bidding & Contract docs, Tech. Specs.2 8 8 12 30
FAARFIELD Pavement Design 1 2 4 7
Virtual Design Review Meeting with OWNER 4 4
Virtual Design Review Meeting with FAA, SCAC 4 4
Update Plans and Specs Based on Review Comments 2 4 2 8
QA/QC of all Design Documents 4 4
Task Subtotals 34.5 39.0 0 76 0 14 164
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $244.00 $210.00 $173.00 $157.00 $126.00 $88.00
Labor Subtotals $8,418.00 $8,190.00 $0.00 $11,932.00 $0.00 $1,232.00 $29,772.00
Included Profit $4,426.69
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Travel (250 Miles Roundtrip from Columbia to GGE) 500 Miles $0.725 $362.50
2 Travel (234 Miles Roundtrip from Wilmington to GGE) 234 Miles $0.725 $169.65
3 Travel (432 Miles Roundtrip from Raleigh to GGE) 432 Miles $0.725 $313.20
4 Xerox Copies (22"x34") 0 Each $5.00 $0.00
5 USPS/UPS Postage 0 Each $50.00 $0.00
$845.35
ATTACHMENT B - Manpower Estimate
TASK NO.
Employee Classifications
Senior Project
Manager
Sr. Aviation
Engineer Senior Designer Designer 2 Designer 1 Admin
Direct Expense Subtotal
TOTAL $30,617.35
Page 33 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
Bidding
DIRECT LABOR
3 Bidding
Coordination with OWNER, Bidders 10 10
Conduct Pre-Bid Conference & Prepare Minutes 12 4 16
Respond to Bidders Questions & Prepare Addenda 4 16 20
Attend Bid Opening (Virtually) 1 1
Prepare Bid Tab, Evaluate Bids, Recommend Award 2 2 8 12
Prepare Contract Documents, Coordinate Execution with Contractor 2 8 10
Task Subtotals 31 2 0 24 0 12 69
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $244.00 $210.00 $173.00 $157.00 $126.00 $88.00
Labor Subtotals $7,564.00 $420.00 $0.00 $3,768.00 $0.00 $1,056.00 $12,808.00
Included Profit $1,904.38
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Travel (250 Miles Roundtrip from Columbia to GGE) 250 Miles $0.73 $181.25
2 Xerox Copies (8.5"x11") - 5 Original Project Manuals, 600 pages each 3,000 Each $0.12 $360.00
3 Xerox Copies (11"x17") 0 Each $0.20 $0.00
4 Xerox Copies (22"x34") - 3 IFB Sets, 40 sheets each 120 Each $5.00 $600.00
5 USPS/UPS Postage 3 Each $50.00 $150.00
$1,291.25Direct Expense Subtotal
TOTAL $14,099.25
ATTACHMENT B - Manpower Estimate
TASK NO.
Employee Classifications
Senior Project
Manager
Sr. Aviation
Engineer Senior Designer Designer 2 Designer 1 Admin
Page 34 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
Construction Administration
DIRECT LABOR
4 Construction Administration (Assumes 90 days contract duration)
Coordination with ALL Stakeholders 33 5 5 43
Prepare Conformed IFC Documents 2 8 8 8 26
Conduct In-Person Pre-Construction Meeting & Prepare Minutes 8 8 4 20
Attend Construction Meetings (Virtual Attendance, twice per month) 8 8 16
Periodic Site Visits (Monthly) 32 32
Review of and Coordination of Submittals 4 4 40 48
Review Initial & Subsequent Construction Schedules & Montior Progress4 9 13
Review and Respond to Requests-For-Information (RFIs) 4 8 12 24
Review Quality Assuarnace Test Results and Preapre Summary Report 2 2 8 12
Review and Process Change Order Proposals 4 2 8 14
Review and Process Contractor's Monthly Pay Applications 2 4 12 18
Attend In-Person Pre-Paving Meeting 8 8 16
Attend Substantial Completion Inspection & Prepare Punchlist 9 10 19
Attend Final Inspection 8 8
Prepare Project Closeout Documentation (different than grant closeout)8 24 32
Task Subtotals 136 100 0 81 0 24 341
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $244.00 $210.00 $173.00 $157.00 $126.00 $88.00
Labor Subtotals $33,184.00 $21,000.00 $0.00 $12,717.00 $0.00 $2,112.00 $69,013.00
Included Profit $10,261.30
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Travel (250 Miles Roundtrip from Columbia to GGE) 2,000 Miles $0.725 $1,450.00
2 Travel (234 Miles Roundtrip from Wilmington to GGE) 702 Miles $0.725 $508.95
3 Xerox Copies (11"x17") 0 Each $0.20 $0.00
4 Xerox Copies (22"x34") 0 Each $5.00 $0.00
5 USPS/UPS Postage 4 Each $50.00 $200.00
$2,158.95Direct Expense Subtotal
TOTAL $71,171.95
ATTACHMENT B - Manpower Estimate
TASK NO.
Employee Classifications
Senior Project
Manager
Sr. Aviation
Engineer Senior Designer Designer 2 Designer 1 Admin
Page 35 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
Construction Management Plan
DIRECT LABOR
5 Construction Management Plan 2 4 32 38
Task Subtotals 2 4 0 32 0 0 38
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $244.00 $210.00 $173.00 $157.00 $126.00 $88.00
Labor Subtotals $488.00 $840.00 $0.00 $5,024.00 $0.00 $0.00 $6,352.00
Included Profit $944.46
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Travel (250 Miles Roundtrip from Columbia to GGE) 0 Miles $0.725 $0.00
2 Xerox Copies (8.5"x11") 0 Each $0.12 $0.00
3 Xerox Copies (11"x17") 0 Each $0.20 $0.00
4 Xerox Copies (22"x34") 0 Each $5.00 $0.00
5 USPS/UPS Postage 0 Each $50.00 $0.00
$0.00Direct Expense Subtotal
TOTAL $6,352.00
ATTACHMENT B - Manpower Estimate
TASK NO.
Employee Classifications
Senior Project
Manager
Sr. Aviation
Engineer Senior Designer Designer 2 Designer 1 Admin
Page 36 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
As-Built Drawings
DIRECT LABOR
6 As-Built Drawings 2 4 24 30
Task Subtotals 2 4 0 24 0 0 30
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $244.00 $210.00 $173.00 $157.00 $126.00 $88.00
Labor Subtotals $488.00 $840.00 $0.00 $3,768.00 $0.00 $0.00 $5,096.00
Included Profit $757.71
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Travel (250 Miles Roundtrip from Columbia to GGE) 0 Miles $0.725 $0.00
2 Xerox Copies (8.5"x11") 0 Each $0.12 $0.00
3 Xerox Copies (11"x17") 0 Each $0.20 $0.00
4 Xerox Copies (22"x34") 0 Each $5.00 $0.00
5 USPS/UPS Postage 0 Each $50.00 $0.00
$0.00Direct Expense Subtotal
TOTAL $5,096.00
ATTACHMENT B - Manpower Estimate
TASK NO.
Employee Classifications
Senior Project
Manager
Sr. Aviation
Engineer Senior Designer Designer 2 Designer 1 Admin
Page 37 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
Grant Services
DIRECT LABOR
7 Grant Services
Coordinate, Prepare & Submit FY 26 FAA Grant Apps (2 maximum) 2 8 10
Coordinate, Prepare & Submit SCAC Grant App (1 maximum) 1 2 3
Quarterly Grant Drawdown Assistance (FAA and SCAC) 3 6 9
Prepare Quarterly Reports (Assumes each grant open for 3 quarters) 3 4 7
Prepare FAA and SCAC Grant Closeout Packages 4 16 20
Task Subtotals 13 16 10 0 0 10 49
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $244.00 $210.00 $157.00 $88.00
Labor Subtotals $3,172.00 $3,360.00 $1,570.00 $0.00 $0.00 $880.00 $8,982.00
Included Profit $1,335.50
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Travel (250 Miles Roundtrip from Columbia to GGE) 0 Miles $0.725 $0.00
2 Xerox Copies (8.5"x11") 0 Each $0.12 $0.00
3 Xerox Copies (11"x17") 0 Each $0.20 $0.00
4 Xerox Copies (22"x34") 0 Each $5.00 $0.00
5 USPS/UPS Postage 0 Each $50.00 $0.00
$0.00Direct Expense Subtotal
TOTAL $8,982.00
ATTACHMENT B - Manpower Estimate
TASK NO.
Employee Classifications
Sr. Project
Manager
Sr. Aviation
Engineer
Aviation
Planner Admin
Page 38 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
Construction Observation/Resident Project Representative
DIRECT LABOR
8 Construction Observation/Resident Project Representative
Attend Pre-Construction Meeting 8 8
Construction Observation (Assumes 90 days = 13 weeks x 50 hrs/week) 650 650
Punchlist Observation 24 24
Task Subtotals 0 0 0 0 0 682 682
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $155.00
Labor Subtotals $0.00 $0.00 $0.00 $0.00 $0.00 $105,710.00 $105,710.00
Included Profit $15,717.65
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Travel - Mileage - RPR 5,200 Miles $0.725 $3,770.00
2 Travel - Mileage - Precon and Punch Items 500 Miles $0.725 $362.50
2 Lodging 68 Nights $110.00 $7,480.00
3 Per Diem 68 Days $68.00 $4,624.00
4 Xerox Copies (22"x34") 0 Each $5.00 $0.00
5 USPS/UPS Postage 0 Each $50.00 $0.00
$16,236.50Direct Expense Subtotal
TOTAL $121,946.50
ATTACHMENT B - Manpower Estimate
TASK NO.
Employee Classifications
Construction
Observer
Page 39 of 253
PROJECT NAME: Apron Reconstruction Project (Re-package, Bid, CA, CO, QA) - Georgetown County Airport 4/24/2026
PREPARED BY: Andy Busbee / Ardurra Group
PHASE AND TASK DESCRIPTION Sub Total
Quality Assurance Testing
DIRECT LABOR
9 Coordination with Subconsultant 10 16 26
Task Subtotals 10 16 0 0 0 0 26
Burdened Labor Rates Per Hour (Based on 2026 MSA with Georgetown County) $244.00 $210.00 $173.00 $157.00 $126.00 $88.00
Labor Subtotals $2,440.00 $3,360.00 $0.00 $0.00 $0.00 $0.00 $5,800.00
Included Profit $862.38
DIRECT EXPENSES QUANTITY UNIT UNIT COST AMOUNT
1 Qaulity Assurance Testing (Subconultant: S&ME) $65,000.00
$65,000.00Direct Expense Subtotal
TOTAL $70,800.00
ATTACHMENT B - Manpower Estimate
TASK NO.Employee Classifications
Senior Project
Manager
Sr. Aviation
Engineer Senior Designer Designer 2 Designer 1 Admin
Page 40 of 253
Page 41 of 253
Page 42 of 253
Page 43 of 253
Page 44 of 253
Page 45 of 253
Page 46 of 253
Page 47 of 253
Page 48 of 253
Page 49 of 253
Page 50 of 253
Page 51 of 253
Page 52 of 253
Page 53 of 253
Page 54 of 253
Page 55 of 253
Page 56 of 253
Page 57 of 253
Item Number: 6d
Meeting Date: 5/12/2026
Item Type:Consent Agenda
Agenda Request Form
Georgetown County Council
DEPARTMENT: Finance Department
ISSUE UNDER CONSIDERATION:
Procurement #26-021, Andrews Gymnasium Floor Replacement
CURRENT STATUS:
Existing conditions with the current gym floor have continued to deteriorate, resulting in
significant buckling of the surface. The extent of this deterioration has rendered more than one-
half of the gymnasium floor unsafe for continued public use.
POINTS TO CONSIDER:
Procurement shall be made utilizing the Sourcewell Cooperative Contract #202002143 as
permitted by the existing procurement code Sec. 2-75 Cooperative Purchasing Agreements:
The Purchasing Officer may procure items, to include but not limited to supplies, equipment or
services through cooperative purchasing agreements with an external procurement activity.
Purchase will be made from vendor FieldTurf, USA of Calhoun, GA for Tarkett Omnisports
multi-sse 6.2 mm flooring with painted game lines in the total amount of $189,255.00.
This is a turn-key project which includes removal and replacement of the existing flooring and
bleachers.
FINANCIAL IMPACT:
This purchase is fully funded in GL Account Number 99440.901.50411-2107 (American Rescue
Plan Funding.Non-Departmental-B&G MAINT- FLOOR REPLACEMENT, ANDREWS GYM) up
to $200,000.
OPTIONS:
STAFF RECOMMENDATIONS:
Parks & Recreation staff have reviewed the proposal submitted and recommend award to
FieldTurf USA, Inc. in the amount of $192.094.00 utilizing their Sourcewell Cooperative
Contract.
ATTORNEY REVIEW:
No
ATTACHMENTS:
1. 26-021, Recommendation
Page 58 of 253
2. Andrews Rec Center - Revised Smartbuy proposal 5.6.2026
Page 59 of 253
Page 60 of 253
Page 61 of 253
Page 62 of 253
Page 63 of 253
Page 64 of 253
Page 65 of 253
Andrews Recreation Center
220 South Cedar Ave
Andrews, SC 29510
Revised 5/6/2026
Page 66 of 253
COOP PRICING PROPOSAL
Date: Revised May 6, 2026
To: Nancy Silver
Georgetown County Purchasing
1134 North Frasier Street
Georgetown, SC 29440
Email: nsilver@gtcounty.org
From: Steven Naum
Regional Sales Manager
175 North Industrial Blvd. NE
Calhoun, GA 30701
(612) 289-9140
Email: steven.naum@tarkettsports.com
Subject: Andrews Recreation Center - Athletic Flooring Proposal
FieldTurf USA, Inc. is pleased to present the following proposal. FieldTurf pricing is
based on the Sourcewell contract. Sourcewell provides predetermined preferential
pricing through approved vendors. Since the products have already been bid at the
national level, individual municipalities do not have to duplicate the bidding process per
Sourcewell Cooperative Contract # 2020002143
Sourcewell Member # 41779 Georgetown County
FieldTurf USA, Inc. holds the Cooperative Purchase contract, any PO for Contract must be made out
to FieldTurf USA, Inc. 175 N Industrial Blvd NE. Calhoun, GA 30701
Page 67 of 253
COOP PRICING PROPOSAL
The scope of work to include the following:
• Furnish and install the Tarkett Omnisports Multi-Use 6.2mm flooring in the
gymnasium.
o The total square footage not to exceed 9,995 s/f.
o This is a one-color installation with the color chosen from Tarkett Sports
standard color line.
o This system will include the Tarkett Tarkolay slip-sheet which is good
up to 100% RH when tested via ASTM F2170.
o The new flooring system will include the Tarkett HPL (high point load)
bleacher blocking at the footprint of the bleachers.
o Included in the price will be 450 lineal feet of standard 4” wall base and 84
lineal feet of doorway transitions.
$158,425.00
• Game lines will be painted for 1-Main basketball court, 2-Cross basketball courts,
2-Pikleball courts, 2-Shuffleboard courts, and 2-track lines.
o The game line colors to be chosen from Tarkett Sports standard color line.
o Custom colors are available at an additional charge.
$14,025.00
• Removal of the existing flooring. $14,110.00
• Removal and Replacement of the existing bleachers. $2,695.00
• Performance & Payment Bond. $2,839.00
Total Cost: $192,094.00
**NOTE:
• Performance & Payment Bonds are not included but can be calculated at a rate of 1.5% of
the contract total if required.
• All local, state, and/or federal taxes, if applicable, are not included and must be added to
the pricing submitted herein.
Page 68 of 253
COOP PRICING PROPOSAL
CLARIFICATIONS TO GENERAL SCOPE:
• Labor pricing is subject to open-shop, non-union, non-prevailing wages and is based on regular work hours.
Night, weekend, and holiday work is excluded.
• Only defective material is subject to returns. All materials are custom ordered and non -refundable.
• Removal of all equipment, stored materials, tables, etc. is excluded & must be completed by others prior to
arrival.
• All other trades shall have completed their work prior to the installation of the flooring.
• Supply, installation, or modification of any game standard equipment or inserts (basketball, volleyball, etc.)
is not included except what is noted herein.
• Prior to the installation of the sports flooring, the subfloor and site conditions are to be within tolerances
and conditions specified by Tarkett Sports, which include but are not limited to that the sub floor shall be
flat and smooth with a tolerance not to exceed +/- 1/8’’ in a 10 ft radius. The concrete slab will be assessed
once the demo is completed and should any additional prep be required beyond the basic prep included in
this proposal additional charges would apply.
• Basketball hoops must be installed before the installation of the flooring. Wall pads (if any) must be
installed after the flooring installation.
• The area to receive new flooring will be closed to all other trades and traffic for the duration of the
installation.
• Modification, including undercutting, of any existing entry doors or stage doors, is not included.
• The areas where new flooring will be installed must be maintained at a minimum temperature of 65° F for
at least 48-hours prior to our arrival, during the entire installation, and for at least 1-week after the work has
been completed.
• Pricing is as per production of Tarkett Sports Omnisports materials in standard roll lengths. Cross-seams
may be visible. Cross seams are a normal part of the installation process and may be necessary. The
frequency and location of cross seams will be determined solely by Tarkett Sports unless otherwise noted
herein.
• Parking space is required for our work truck and trailer at the site.
• Pricing is based on materials being shipped directly from the manufacturer to the jobsite at current fuel
surcharges. If, for any reason, materials must be re-routed or stored offsite, or surcharges change, additional
freight and storage charges will apply.
• The pricing submitted is based on the continuous application of our work. Multiple mobilizations are
excluded.
• Protection of the finish flooring is excluded due to the cure time of the game line paint.
The price is valid for a period of 90 days. The price is subject to increase if affected by an increase in raw materials, fre ight, or other manufacturing costs, a tax increase, new taxes, levies
or any new legally binding imposition affecting the transacti on. The parties recognize that the effects of global economic instability are currently unpredictable and could lead to
limitations in labor availability and delays in the supply and delivery of materials, equipment or products. In addition, as these contingencies have not been factored into this proposal;
materials, equipment and/or products to be used in performing the work may become subject to a price increase. Accordingly, i t is acknowledged that the seller/FieldTurf shall (a) not be
subject to any damages for any delay due to events beyond its control and, (b) be allowed an equitable adjustment of the time and/or of the pri ce of this proposal or any contractual
document resulting therefrom. FieldTurf shall endeavor to notify you as soon as possible of any such events and/or contingencies. Please note that the seller/FieldTurf shall use its best
efforts to ensure that it fulfills its commitments and will strive to minimize any negative impacts as they may arise. Thank you for your kind understanding.
Page 69 of 253
COOP PRICING PROPOSAL
CONDITIONS: Notwithstanding any other document or agreement entered by FieldTurf in connection with
the supply and installation only of its product pursuant to the present bid proposal, the following shall apply .
a) This bid proposal and its acceptance is subject to strikes, accidents, delays beyond our control and
force majeure.
b) FieldTurf’s preferred payment terms are as follows: payment in full is due and payable upon
substantial completion of the work, which shall be deemed achieved when the work is available for
its intended use, notwithstanding any outstanding punch list items or the Customer's failure to
execute the Certificate of Completion.
c) Accounts overdue beyond 30 days of invoice date will be charged at an interest rate of 10% per
annum.
d) FieldTurf requires a minimum of 21 days after receiving a fully executed contract or purchase order
and final approvals on shop drawings to manufacture, coordinate delivery and schedule arrival of
installation crew. Under typical field size and scenario, F ieldTurf further requires a minimum of 28
days per field to install the Product subject to weather and force majeure
e) This proposal is based on a single mobilization. If the site is not ready and additional mobilizations
are necessary, additional charges will apply.
f) Upon substantial completion of FieldTurf’s obligations, the Customer shall sign FieldTurf’s
Certificate of Completion in the form currently in force; to accomplish this purpose, the Customer
will ensure that an authorized representative is present at the w alk-through to determine substantial
completion and acceptance of the field, which may include a list of punch list items.
g) FieldTurf shall not be a party to any penalty clauses and/or liquidated damages provisions.
h) FieldTurf shall be entitled to recover all costs and expenses, including attorney fees, associated with
collection procedures in the event that FieldTurf pursues collection of payment of any past due
invoice.
i) All colors are to be chosen from FieldTurf’s standard colors.
The present proposal serves to provide an overview of the terms and conditions
governing the business relationship between the parties for the completion of the
above-referenced transaction. The parties hereby undertake to subsequently
formalize their agreement by signing a more detailed agreement and/or purchase
order (“Contract”) and as such the amount listed herein shall be an estimate which
will be formalized in said Contract.
By its signature(s) below, the customer acknowledges having read and accepted this
proposal and undertakes to be bound by it.
Name: ______________________________________________________________
Company: ___________________________________________________________
Signature: ___________________________________________________________
Title: __________________________________________ Date:________________
Page 70 of 253
Page 71 of 253
Work Order Signature Document
Sourcewell EZIQC Contract No.: 2023-24-100-R5-GC-SWC
Choppee Resource Center Windows
New Work Order
149569.00
Modify an Existing Work Order
Work Order Title:
Work Order Number.: Work Order Date:
X
11/20/2025
Contractor Name:
Contact:
Phone:
Contact:
Phone:
Chris Perry
Owner Name: Georgetown County
Beth Goodale
843-545-3550
S-Works Construction Corp
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
Sourcewell EZIQC Contract No 2023-24-100-R5-GC-SWC.
Brief Work Order Description:
Replace windows.
Will not apply:Liquidated Damages Will apply:
Estimated Completion Date:
Estimated Start Date: Time of Performance
X
Work Order Firm Fixed Price: $171,863.68
Owner Purchase Order Number:
Approvals
Date DateContractorOwner
2.00
Page 1 of 1
11/20/2025
Work Order Signature Document
11/20/2025
Page 72 of 253
3.00
Detailed Scope of Work
Beth GoodaleChris PerryTo: From:
S-Works Construction Corp Georgetown County
14516 Lee Rd 129 Screven St
Chantily, MD 20151 Georgetown, SC 29440
No Data Input 843-545-3550
Work Order Number:
November 20, 2025Date Printed:
149569.00
Choppee Resource Center WindowsWork Order Title:
Brief Scope: Replace windows.
Revised FinalPreliminary X
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
o General:
1. Project Description:
1. Furnish all supervision, labor, transportation, materials, and equipment, to
perform all operations necessary to complete the following:
Brief Description: The following scope of work is to define work items associated with (Replacement
of windows at Choppee Resource Center) located in (Georgetown, SC).
Safety
1. All personnel must adhere to S-Works Safety Requirements and all applicable OSHA,
state, and local regulations.
2. Use of all appropriate personal protective equipment (PPE) is required at all times.
o Hardhats, reflective vests, and eye protection are required at all times. Personnel working with
or around heavy equipment must wear ear protection while the equipment is in operation.
1. ANSI Level 4 cut-resistant gloves are required for all personnel handling tools, materials, or
equipment.
2. All personnel must attend site-specific safety orientation and perform daily pre-task planning
meetings (e.g., Activity Hazard Analysis or equivalent).
3. All tasks of work will require:
§ Activity Hazard Analysis (AHA).
§ Letter of designation for competent/qualified persons (as applicable).
§ Proof of current First Aid/CPR training.
o High-risk tasks (e.g., lockout/tagout, confined space entry, hot work, fall protection, crane/lift
operations) will require a written plan of action approved by site supervision prior to
commencement.
o Unsafe acts or failure to follow site safety requirements will result in, at minimum, immediate
removal from S-Works job sites and may lead to termination of contract at S-Works discretion.
Submittals:
1. Provide manufacturer’s catalog data, technical data, shop drawings, and samples for the
Page 1 of 2
11/20/2025
Scope of Work
Page 73 of 253
Detailed Scope of Work Continues..
Work Order Title:
Work Order Number: 149569.00
Choppee Resource Center Windows
following items in accordance with the contract:
§ Schedule of work
§ Activity hazard analysis
§ First Aid & CPR
§ Window Shop Drawings
§ Glass and Window Framing Product Data
§ Joint Sealant Product Data
Subject to the terms and conditions of JOC Contract 2023-24-100-R5-GC-SWC.
Contractor Date
DateOwner
Page 2 of 2
11/20/2025
Scope of Work
11/20/2025
Page 74 of 253
4.00
Contractor's Price Proposal - Summary
Owner PO #:
Choppee Resource Center Windows
149569.00
2023-24-100-R5-GC-SWCIQC Master Contract #:
Work Order #:
Title:
Re:
November 20, 2025Date:
Proposal Value:
Contractor: S-Works Construction Corp
$171,863.68
$8,660.2101 - General Requirements
$2,087.0406 - Wood, Plastic, and Composites
$55,661.3607 - Thermal & Moisture Protection
$103,814.2608 - Openings
$1,640.8109 - Finishes
Proposal Total
Thisl total represents the correct total for the proposal. Any discrepancy between line totals,
sub-totals and the proposal total is due to rounding.
$171,863.68
Page 1 of 1
11/20/2025
Contractor's Price Proposal - Summary
Page 75 of 253
5.00
Contractor's Price Proposal - Detail
Choppee Resource Center Windows
149569.00
2023-24-100-R5-GC-SWCIQC Master Contract #:
Work Order #:
Owner PO #:
Title:
Re:
November 20, 2025Date:
Proposal Value:
Contractor: S-Works Construction Corp
$171,863.68
(Excludes)Equip. MaterialLabor
Line TotalDescriptionUOMMod.ItemSect.
01 - General Requirements
01 22 20 00 0015 LaborerFor tasks not included in the Construction Task Catalog® and as
directed by owner only.
1 $1,655.10HR
Installation =x x 1,655.10
FactorUnit PriceQuantity Total
39.62 1.1604 36.00
Laborer to remove and rehang blinds (22 hrs), landscape seed/straw and revitalization of disturbed areas (14
hrs).
01 22 20 00 0057 Principal Engineer2 $951.53HR
Installation =x x 951.53
FactorUnit PriceQuantity Total
205.00 1.1604 4.00
Review and stamp of window framing and glass shop drawings and calculations
01 22 20 00 0059 Engineer3 $3,104.07HR
Installation =x x 3,104.07
FactorUnit PriceQuantity Total
133.75 1.1604 20.00
Production of window framing and glass shop drawings and calculations
01 52 13 00 0032 8' x 8' x 20' Storage Container4 $212.90MO
Installation =x x 212.90
FactorUnit PriceQuantity Total
183.47 1.1604 1.00
Storage container to be utilized for staging/securing window material and glass.
01 52 13 00 0032 0018 For Each Delivery And Removal, Two Round Trips, Add5 $166.17MOD
Installation =x x 166.17
FactorUnit PriceQuantity Total
143.20 1.1604 1.00
01 56 16 00 0008 6 Mil, Fire Retardant, Plastic Sheeting, Applied To CeilingsIncludes removal
after use.
6 $974.74SF
Installation =x x 974.74
FactorUnit PriceQuantity Total
0.42 1.1604 2,000.00
1 boxes of plastic for temp protection on interior
01 56 16 00 0082 1/8" Thick, Masonite For Temporary Floor ProtectionIncludes removal after
use.
7 $285.92SF
Installation =x x 285.92
FactorUnit PriceQuantity Total
0.77 1.1604 320.00
10 sheets of masonry protection
01 71 13 00 0002 Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback
Flatbed TruckIncludes loading, tie-down of equipment, delivery of equipment,
off loading on site, rigging, dismantling, loading for return and transporting
away. For equipment such as trenchers, skid-steer loaders (bobcats), industrial
warehouse forklifts, sweepers, scissor platform lifts, telescoping and
articulating boom man lifts with up to 40' boom lengths, etc.
8 $373.50EA
Installation =x x 373.50
FactorUnit PriceQuantity Total
321.87 1.1604 1.00
Mobilization and Demobilization of equipment
01 74 19 00 0015 30 CY Dumpster (4 Ton) "Construction Debris"Includes delivery of dumpster,
rental cost, pick-up cost, hauling, and disposal fee. Non-hazardous material.
9 $936.28EA
Installation =x x 936.28
FactorUnit PriceQuantity Total
806.86 1.1604 1.00
Dumpster for demolition of windows and general trash
Page 1 of 4
11/20/2025
Contractor's Price Proposal - Detail
Page 76 of 253
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 149569.00
Choppee Resource Center Windows
$8,660.21Subtotal for 01 - General Requirements
06 - Wood, Plastic, and Composites
06 05 23 00 0241 #12 x 1-1/2" Galvanized Steel Screw10 $166.81EA
Installation =x x 166.81
FactorUnit PriceQuantity Total
1.15 1.1604 125.00
Screws for temporary plywood in window openings
06 05 23 00 0241 0105 For >100 To 250, Deduct11 -$29.01MOD
Installation =x x -29.01
FactorUnit PriceQuantity Total
-0.20 1.1604 125.00
06 11 16 00 0049 2" x 4" Wood Stud Framing, For Partition Walls12 $171.74LF
Installation =x x 124.16
FactorUnit PriceQuantity Total
1.07 1.1604 100.00
Demolition x x = 47.58 0.41 1.1604 100.00
Temporary enclosure for window openings after demolition.
06 11 16 00 0070 2" x 4" Wood Sill13 $945.73LF
Installation =x x 945.73
FactorUnit PriceQuantity Total
1.63 1.1604 500.00
2x4 wood framing for window blocking (to be clad with metal)
06 16 33 00 0012 1/2" Interior BC Plywood Wall SheathingApplied to wall studs.14 $783.50SF
Installation =x x 631.26
FactorUnit PriceQuantity Total
1.70 1.1604 320.00
Demolition x x = 152.24 0.41 1.1604 320.00
Temporary enclosure for window openings after demolition. 10 Sheets of Plywood.
06 16 33 00 0012 0006 For Exterior CC Grade Plywood, Add15 $48.27MOD
Installation =x x 48.27
FactorUnit PriceQuantity Total
0.13 1.1604 320.00
For exterior use for temporary window locations
$2,087.04Subtotal for 06 - Wood, Plastic, and Composites
07 - Thermal & Moisture Protection
07 62 13 00 0025 0.032" Thick, Mill Finish, Aluminum Flashing And Trim16 $34,119.24SF
Installation =x x 34,119.24
FactorUnit PriceQuantity Total
12.15 1.1604 2,420.00
Aluminum Cladding (20 gauge) around wood blocking at windows, at top of wall location to cover steel, and at
steel supports at windows and in between glass block.
07 62 13 00 0025 0074 For Baked Aluminum Colors, Add17 $2,302.70MOD
Installation =x x 2,302.70
FactorUnit PriceQuantity Total
0.82 1.1604 2,420.00
Dark Bronze Finish
07 62 13 00 0025 0075 For Wrap Around Window Panning, Add18 $11,064.18MOD
Installation =x x 11,064.18
FactorUnit PriceQuantity Total
3.94 1.1604 2,420.00
Wrap around steel supports and window blocking
07 91 23 00 0005 5/8" Polyethylene Or Polyurethane Backer Rod19 $2,028.26LF
Installation =x x 1,787.02
FactorUnit PriceQuantity Total
2.00 1.1604 770.00
Demolition x x = 241.25 0.27 1.1604 770.00
Backer rod for joint sealant (770LF).
Page 2 of 4
11/20/2025
Contractor's Price Proposal - Detail
Page 77 of 253
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 149569.00
Choppee Resource Center Windows
07 - Thermal & Moisture Protection
07 92 13 00 0010 1/2" x 5/8" Joint, Silicone Sealant And Caulking20 $4,412.14CLF
Installation =x x 3,962.17
FactorUnit PriceQuantity Total
443.44 1.1604 7.70
Demolition x x = 449.97 50.36 1.1604 7.70
Joint sealant utilized around the windows and doors. Exterior sealant included in window framing, quantity
included here is for interior (secondary) sealant of the openings (770LF).
07 92 13 00 0010 0092 For Custom Match Coloring, Add21 $626.89MOD
Installation =x x 626.89
FactorUnit PriceQuantity Total
70.16 1.1604 7.70
Dark Bronze to Match
07 92 13 00 0010 0110 For >6 CLF, Deduct22 -$328.72MOD
Installation =x x -328.72
FactorUnit PriceQuantity Total
-36.79 1.1604 7.70
770 LF
07 92 13 00 0010 0123 For 1 Part Mildew Resistant, Add23 $914.24MOD
Installation =x x 914.24
FactorUnit PriceQuantity Total
102.32 1.1604 7.70
Exterior grade sealant
07 92 13 00 0010 0124 For High-Modulus Non-Acid Curing, Add24 $522.43MOD
Installation =x x 522.43
FactorUnit PriceQuantity Total
58.47 1.1604 7.70
Exterior grade sealant
$55,661.36Subtotal for 07 - Thermal & Moisture Protection
08 - Openings
08 43 13 00 0039 5' High With Horizontal Mullion, 2" x 4-1/2" Frame, Vertical Mullions 4' On
Center, Aluminum Storefront Framing Assembly
25 $20,566.12SF
Installation =x x 17,126.11
FactorUnit PriceQuantity Total
30.12 1.1604 490.00
Demolition x x = 3,440.01 6.05 1.1604 490.00
490 SF of Window Replacement (33" x 45"). Requested to be non-impact rated
08 43 13 00 0039 0173 For Black Color Class I Anodized Finish, Add26 $2,143.61MOD
Installation =x x 2,143.61
FactorUnit PriceQuantity Total
3.77 1.1604 490.00
Dark Bronze Finish
08 81 23 23 0074 1" Thick, Laminated Insulating Glass, Field Installed GlassInsulated glass units
consisting of 1/4" thick inner pane, 3/16" air gap, and outer laminated pane of
0.060" PVB film between two layers 1/4" thick glass.
27 $53,146.67SF
Installation =x x 53,146.67
FactorUnit PriceQuantity Total
93.47 1.1604 490.00
1" insulated glass. Requested to not be impact rated.
08 81 23 23 0074 0060 For Low-E Coated Glass, Add28 $11,661.90MOD
Installation =x x 11,661.90
FactorUnit PriceQuantity Total
20.51 1.1604 490.00
Triple silver low-e coating
08 81 23 23 0074 0067 For Reflective Coated Glass, Add29 $13,993.15MOD
Installation =x x 13,993.15
FactorUnit PriceQuantity Total
24.61 1.1604 490.00
Enhanced triple low-e glass coating
Page 3 of 4
11/20/2025
Contractor's Price Proposal - Detail
Page 78 of 253
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 149569.00
Choppee Resource Center Windows
08 - Openings
08 81 23 23 0074 0277 For >400, Deduct30 -$4,196.24MOD
Installation =x x -4,196.24
FactorUnit PriceQuantity Total
-7.38 1.1604 490.00
490 SF of glass/glazing
08 81 23 23 0074 0278 For Glass Removal And Preparing Opening For New Glazing, Add31 $6,499.05MOD
Installation =x x 6,499.05
FactorUnit PriceQuantity Total
11.43 1.1604 490.00
Demolition of existing glass and disposal
$103,814.26Subtotal for 08 - Openings
09 - Finishes
09 91 23 00 0042 2 Coats Paint, Brush Work, Paint Interior Concrete Block Walls32 $1,640.81SF
Installation =x x 1,640.81
FactorUnit PriceQuantity Total
2.02 1.1604 700.00
Touchup painting on interior around window installation
$1,640.81Subtotal for 09 - Finishes
Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub-totals and the proposal total is due to rounding.
$171,863.68
Page 4 of 4
11/20/2025
Contractor's Price Proposal - Detail
Page 79 of 253
Subcontractor Listing
149569.00
Choppee Resource Center Windows
2023-24-100-R5-GC-SWCIQC Master Contract #:
Work Order #:
Owner PO #:
Title:
Re:
November 20, 2025Date:
Proposal Value:
Contractor: S-Works Construction Corp
$171,863.68
%DutiesName of Contractor Amount
No Subcontractors have been
selected for this Work Order
0.00$0.00
6.00
Page 1 of 1
11/20/2025
Subcontractor Listing
Page 80 of 253
S-WORKS PROPOSAL WORK PLAN
Choppee Resource Center Windows
Georgetown County
8189 Choppee Road
Georgetown, SC 29440
S-Works Job #GTown-25-001
November 20, 2025
1) General:
a) Project Description:
i) Furnish all supervision, labor, transportation, materials, and equipment, to perform all operations
necessary to complete the following:
(a) Brief Description : The following scope of work is to define work items associated with
(Replacement of windows at Choppee Resource Center) located in (Georgetown, SC).
b) Safety
i) All personnel must adhere to S-Works Safety Requirements and all applicable OSHA, state, and local
regulations.
ii) Use of all appropriate personal protective equipment (PPE) is required at all times.
iii) Hardhats, reflective vests, and eye protection are required at all times. Personnel working with or around
heavy equipment must wear ear protection while the equipment is in operation.
iv) ANSI Level 4 cut-resistant gloves are required for all personnel handling tools, materials, or equipment.
v) All personnel must attend site-specific safety orientation and perform daily pre-task planning meetings
(e.g., Activity Hazard Analysis or equivalent).
vi) All tasks of work will require:
(1) Activity Hazard Analysis (AHA).
(2) Letter of designation for competent/qualified persons (as applicable).
(3) Proof of current First Aid/CPR training.
vii) High-risk tasks (e.g., lockout/tagout, confined space entry, hot work, fall protection, crane/lift operations)
will require a written plan of action approved by site supervision prior to commencement.
viii) Unsafe acts or failure to follow site safety requirements will result in, at minimum, immediate removal
from S-Works job sites and may lead to termination of contract at S-Works discretion.
c) Submittals:
i) Provide manufacturer’s catalog data, technical data, shop drawings, and samples for the following items in
accordance with the contract:
(1) Schedule of work
(2) Activity hazard analysis
(3) First Aid & CPR
(4) Window Shop Drawings
(5) Glass and Window Framing Product Data
(6) Joint Sealant Product Data
(7) Metal Cladding Product Data
Page 81 of 253
S-Works Construction
Scope of Work
November 20, 2025
Page 2 of 5
d) General Notes for all Work:
i) All work shall be performed in full compliance with the South Carolina Uniform Statewide Building Code,
the National Electrical Code (NEC), and all applicable local codes, ordinances, and regulations, including
any amendments or interpretations in effect at the time of the start of construction.
ii) Davis Bacon or other wage scale determinations do not apply.
iii) SCHEDULE:
(1) This work plan provides construction during normal working hours, Monday through Friday, 7:00 AM to
4:00 PM.
(2) To limit disruption to the end user, mobilization will begin only after all required materials are on hand.
(3) The project preliminary schedule of 21 calendar day s (15 workdays), starting upon S-Works’ receipt of
the Notice to Proceed, in accordance with the scope of work, drawings, and schedule provided.
(a) The project’s on-site construction duration of 3 weeks.
(4) Completion of the proposed schedule is dependent on the Client’s timely review and approval of
submittals, RFIs, and other project documentation as outlined in the schedule.
(5) The proposed schedule also assumes consistent and reliable access to all spaces required for daily work
activities.
(6) The preliminary schedule does account for normal projected weather days per the NOAA Weather Days
Table.
e) Qualifications:
i) Proposal is based on information provided in an email by Georgetown County and Gordian, dated
9/24/25. Scope is further quantified and labeled in pictures within the SOW.
ii) Proposal is based on site visit on 10/6/25.
iii) Any and all items not specifically identified herein are not included in the base scope of work and
subsequently excluded from the cost proposal. All changes will require acceptance by both parties prior
to commencement of work.
iv) Upon acceptance of this proposal, all line-item estimates provided for pricing and scope clarity shall be
consolidated into a single Lump Sum amount. The Lump Sum represents the full compensation for
furnishing all labor, materials, equipment, supervision, and services necessary to complete the Work as
described in the approved scope, drawings, and specifications. Individual line items shall not be subject
to adjustment except as modified by approved change orders.
v) S-Works does not include the relocation of owner property within the limits of construction.
vi) S-Works does not include Minority Business Requirements or US Citizen requirements.
vii) This proposal is valid for (30) days after the proposal delivery date listed on the cover page. S-Works
Construction reserves the right to revise and resubmit proposal scope and cost after (30) days.
viii) Order of precedence: The Agreement governs. This SOW clarifies scope where drawings/specs conflict or
are silent.
ix) S-Works will provide a full-time on-site superintendent during active construction to coordinate
subcontractors, enforce safety, and maintain site housekeeping.
x) S-Works assumes existing systems are code-compliant; modifications outside contract are not included.
xi) Insurance: Builder’s Risk insurance not included.
xii) Permits: Building permit fees and costs are not included.
xiii) Testing/Inspections: Third-party testing and special inspections are not included.
Page 82 of 253
S-Works Construction
Scope of Work
November 20, 2025
Page 3 of 5
xiv) Hazardous Materials: Removal, disposal, testing, monitoring, or protection against asbestos, lead,
PCB’s, or other hazardous materials not included.
xv) Utilities: Utility company fees are not included. Relocation/removal of overhead/underground utilities
not specifically included are not included.
xvi) Commissioning: Commissioning and coordination with commissioning agents is not included unless
noted.
xvii) Owner-furnished items: Delays due to Owner Furnished Contractor Installed equipment/materials are
not included.
xviii) Temporary Facilities: Include temporary restrooms, storage, protection, etc. as defined in SOW.
xix) Payment & Performance Bonds: Included.
2) Emergency Response & Site Controls:
a) S-Works will maintain first aid kits and fire extinguishers on site.
b) Emergency contacts and the nearest Hospital and Occupational Health Clinic will be posted in the field office.
c) All incidents, near misses, and injuries must be reported immediately to site supervision.
d) Housekeeping: Work areas will be kept in a neat, orderly, and safe condition. Trash and debris will be removed
daily.
3) Scope Of Work:
The contractor shall furnish material and labor to complete the following work per the attached scope of work,
identified specifications, proposed schedule and S-Works Safety Requirements:
a) Division-Specific Scopes
i) Division 01 – General Requirements
(1) Furnish all supervision, labor, materials, and equipment required to complete the window and door
replacement work as outlined below.
(a) Provide full-time supervision, project management, and labor for duration of project
(approximately 3 weeks).
(b) Provide temporary facilities including one 8’ × 8’ × 20’ storage container with delivery and
removal, one portable toilet with weekly service, and a two-station handwash unit.
(c) Provide mobilization and demobilization of equipment as necessary.
(d) Provide lift for elevated cladding and window installation.
(e) Install temporary floor and dust protection using 6 mil fire-retardant plastic sheeting and ⅛"
Masonite.
(f) Provide temporary exterior enclosures as needed to protect openings from exterior elements.
Utilizing plywood and 2x4 studs.
(g) Provide daily housekeeping and final window cleaning (interior and exterior).
(h) Dispose of all construction debris using 30 CY dumpsters.
(i) Protect adjacent finishes and landscaping; restore disturbed areas with seed and straw.
(j) Coordinate phasing and working hours with Owner to minimize disruption to building operations.
Page 83 of 253
S-Works Construction
Scope of Work
November 20, 2025
Page 4 of 5
ii) Division 06 – Wood, Plastics, and Composites
(1) Furnish and install wood blocking around window surrounds to be clad in aluminum to match
windows.
(2) Furnish and install plywood and 2x4’s for temporary enclosures as needed to protect openings during
replacement.
iii) Division 07 – Thermal and Moisture Protection
(1) Provide aluminum cladding (20 gauge) on steel members exposed surrounding windows. Include
color to match storefront window framing.
(2) Furnish and install 20 gauge aluminum flashing and trim for cladding at wood blocking surrounding
window openings. Color to match storefront framing.
(3) Install 1,540 LF of backer rod and sealant for interior and exterior window joints. Sealant will be rated
for exterior use and will match storefront framing material.
iv) Division 08 – Openings
(1) Windows – 37 Total Units
(a) Replace (37) standard-size windows (approx. 33" × 45").
(b) Total glazed area: approximately 490 SF of 1" insulated glass.
(c) Furnish and install aluminum storefront framing system (Oldcastle Series 3000 Thermal Multiplane
or equal) with dark bronze anodized finish.
(d) Provide triple-silver low-E coated reflective laminated insulated glass (non-impact rated).
(e) Remove and dispose of existing glazing and frames and prepare openings for new storefront
installation.
v) Division 09 – Finishes
(1) Furnish and install touch-up painting at interior wall surfaces adjacent to new window installations
(approximately 700 SF of interior CMU or gypsum wall area).
(2) Apply two coats of paint to match existing color and finish using low-VOC products.
4) ADDITIONAL CLARIFICATIONS:
a) Special of Long Lead time equipment or materials:
i) Aluminum Window Framing is 5–6-week lead times from release.
ii) Insulated Glass Units are 4 weeks from release.
b) Possible disruption to building personnel and plans to minimize:
i) Area to be free of owner personnel and pedestrians during construction.
ii) All locations will be barricaded off during construction.
c) Hazardous Materials:
i) None anticipated or included.
Page 84 of 253
S-Works Construction
Scope of Work
November 20, 2025
Page 5 of 5
d) STAFFING PLAN:
i) SR PM/PX/VP: Chris Perry
ii) Project Manager: TBD
iii) Superintendent: Julio Castillo
e) PERMITS:
i) None included or anticipated.
Page 85 of 253
Windows (37) to be Replaced
33"
45"
These windows to be
replaced in future phases.
Cladding at Supports
Page 86 of 253
1
66361714 v1
ORDINANCE NO. 26-12
AUTHORIZING THE ISSUANCE AND SALE OF NOT EXCEEDING
$25,000,000 GENERAL OBLIGATION BONDS, IN ONE OR MORE
YEARS, IN ONE OR MORE SERIES, WITH APPROPRIATE SERIES
DESIGNATIONS, AND THE ISSUANCE OF GENERAL
OBLIGATION BOND ANTICIPATION NOTES, IN ONE OR MORE
YEARS, IN ONE OR MORE SERIES, WITH APPROPRIATE SERIES
DESIGNATIONS, BY GEORGETOWN COUNTY, SOUTH
CAROLINA; PROVIDING FOR THE FORM OF THE BONDS AND
NOTES; FIXING CERTAIN DETAILS OF THE BONDS AND NOTES;
AUTHORIZING THE COUNTY ADMINISTRATOR OR HIS
LAWFULLY-AUTHORIZED DESIGNEE TO DETERMINE CERTAIN
MATTERS RELATING TO THE BONDS AND NOTES; PROVIDING
FOR THE PAYMENT OF THE BONDS AND NOTES AND THE
DISPOSITION OF THE PROCEEDS THEREOF; AND OTHER
MATTERS RELATING THERETO.
BE IT ORDAINED BY THE COUNTY COUNCIL OF GEORGETOWN COUNTY, SOUTH
CAROLINA, AS FOLLOWS:
SECTION 1. Findings and Determinations. The County Council (the “County Council”), of
Georgetown County, South Carolina (the “County”), hereby finds and determines:
(a) Pursuant to Section 4-9-10, Code of Laws of South Carolina 1976, as amended (the “S. C.
Code”), and the results of a referendum held in accordance therewith, the Council-Administrator form of
government was adopted and the County Council constitutes the governing body of the County.
(b) Article X, Section 14 of the Constitution of the State of South Carolina, 1895, as amended
(the “Constitution”), provides that each county shall have the power to incur bonded indebtedness in such
manner and upon such terms and conditions as the General Assembly shall prescribe by general law. Such
debt must be incurred for a public purpose and a corporate purpose in an amount not exceeding eight percent
(8%) of the assessed value of all taxable property of such county.
(c) Pursuant to Title 4, Chapter 15 of the S. C. Code (the same being and hereinafter referred to
as the “County Bond Act”), the governing bodies of the several counties of the State of South Carolina (the
“State”) may each issue general obligation bonds to defray the cost of any authorized purpose and for any
amount not exceeding its applicable constitutional limit.
(d) The County Bond Act provides that as a condition precedent to the issuance of bonds an
election be held and the result be favorable thereto. Title 11, Chapter 27 of the S. C. Code provides that if an
election be prescribed by the provisions of the County Bond Act, but not be required by the provisions of
Article X of the Constitution, then in every such instance, no election need be held (notwithstanding the
requirement therefor) and the remaining provisions of the County Bond Act shall constitute a full and
complete authorization to issue bonds in accordance with such remaining provisions.
(e) Pursuant to Section 4-1-300 of the S. C. Code (the “Capital Project Sales Tax Act,” upon
meeting the conditions and requirements therein including but not limited to a successful referendum held in
Page 87 of 253
2
66361714 v1
the County, the County is authorized to impose a special one percent sales and use tax (the “Sales And Use
Tax”) within the County.
(f) In a referendum (the “Referendum”) held in the County on November 5, 2024, the
following question was submitted to the qualified electors of the County:
Must a special one percent sales and use tax be imposed in Georgetown County, South
Carolina for 8 years to raise the amounts specified for the following purposes:
PRIMARY PROJECTS LIST IN ORDER OF PRIORITY
1. Browns Ferry Water District - $3,068,000 for water system improvements.
2. City of Georgetown - $1,040,000 (as grant match funding) for relocation of
electric utility lines along Black River Road.
3. Waccamaw Regional Transit Authority - $624,000 (as grant match funding) for a
passenger transfer facility in the City of Georgetown.
4. Town of Andrews - $2,332,070 for E. Cherry St., Rosemary Ave. and
Georgetown Hwy. water system improvements.
5. Town of Andrews - $652,426 (as grant match funding) for S. Rosemary, Morgan
Ave, E. Cherry St. and system wide water and sewer system improvements.
6. Town of Pawleys Island - $286,000 for north jetty improvements.
7. Georgetown County - $832,000 for NW Regional Park at Pleasant Hill covered
pavilion.
8. Georgetown County - $572,000 for Waccamaw Regional Recreation Center
multi-sport court project.
9. Georgetown County Water and Sewer District - $13,302,650 for Sampit
community sewer project.
10. Town of Pawleys Island - $2,080,000 for stormwater drainage project.
11. Georgetown County - $988,000 for Phase I of Wachesaw Park project.
12. Town of Andrews - $1,352,000 for public works and fire equipment storage
facility.
13. Georgetown County Water and Sewer District - $2,325,866 for Jerusalem and
Northwest Old Pee Dee region water project.
14. Georgetown County -$988,000 for landfill maintenance facility.
15. City of Georgetown - $1,040,000 for fire substation.
Page 88 of 253
3
66361714 v1
16. City of Georgetown - $2,570,204 for S. Fraser and Emmanuel Streets (steel mill
system) stormwater improvements.
17. Georgetown County Water and Sewer District - $7,408,591 for Kilsock to
Plantersville water connection Phases I and II.
18. Georgetown County Water and Sewer District - $7,847,371 for Plantersville
water system.
19. Georgetown County - $10,000,000 for Emergency Operations and 911 facility.
20. Georgetown County - $ 4,040,794 for Midway Fire & Rescue Station 83
replacement.
21. Georgetown County - $5,720,633 for MLK Drive in Pawleys Island drainage and
multi-modal path.
22. Georgetown County Water and Sewer District - $5,282,496 for St. Luke
Community sewer project.
CONTINGENCY PROJECT LIST IN ORDER OF PRIORITY
1. Georgetown County – $1,000,000 (as grant match funding) for Murrells Inlet
dredging.
2. Georgetown County Water and Sewer District – $4,575,165 for Oatland sewer.
3. Georgetown County Water and Sewer District – $2,597,265 for 701 sewer pump
station.
4. Georgetown County - $3,540,000 for Parkersville drainage and multi-modal
path.
5. Georgetown County - $3,022,269 (as grant match funds) for Brick Chimney Rd.
phase II.
6. Town of Andrews – $6,500,000 for stormwater improvements.
7. Georgetown County Water and Sewer District – $3,899,890 for Brick Chimney
sewer main.
8. Georgetown County – $1,825,925 for airport water and sewer.
9. Georgetown County – $2,437,500 for Petigru North drainage and multi-modal
path.
10. City of Georgetown – $3,308,550 for Church St. to Merriman Rd. stormwater
project.
Page 89 of 253
4
66361714 v1
11. City of Georgetown – $2,932,087 for Oak, Elizabeth, and Morrison Street water
project.
12. Georgetown County – $2,800,000 for a new Airport Drive Fire and EMS station.
13. Georgetown County – $1,000,000 for emergency services training facility.
14. Georgetown County – $2,000,000 for Garden City beach groins.
15. Rural Community Water District – $4,819,650 for new elevated water tank.
16. Georgetown County Water and Sewer District – $6,404,750 for Hwy 521 water
main.
17. City of Georgetown – $1,369,650 for Cannon street stormwater project.
18. Georgetown County – $2,800,000 for Ringle Heights area Fire and EMS station.
19. Georgetown County - $2,409,705 for Petigru South drainage and multi-modal
path.
Pending the receipt of such sales and use tax, must the County also be authorized to issue
and sell, either as a single issue or as several separate issues, general obligation bonds
(the “Bonds”) of the County in an aggregate principal amount not exceeding
$25,000,000, to defray a portion of the costs of the County sponsored projects listed
above plus issuance costs, to be paid from the sales and use tax to be imposed as stated
herein and pledged to the payment of the principal of and interest on the Bonds, and, in
the event such sales and use tax is inadequate, such Bonds shall be payable from a
sufficient ad valorem tax imposed on all taxable property in the County.
The Referendum was duly conducted and a majority of the qualified electors in the County voted in
favor of the imposition of the Sales and Use Tax and issuance of the Bonds set forth in the question.
(g) Article X, Section 15 of the Constitution further provides that general obligation bond
anticipation notes may be issued in anticipation of the proceeds of general obligation bonds which may
lawfully be issued under such terms and conditions that the General Assembly may prescribe by law.
Pursuant to the provisions of Title 11, Chapter 17 of the S.C. Code, any borrower, whenever authorized by
general or special law to issue bonds, may, pending the sale and issuance thereof, borrow in anticipation of
the receipt of the proceeds of the bonds. Such provisions also provide that if any approval be necessary
prior to the issuance of bonds by the County, the County must obtain the same approval prior to the issuance
of temporary financing provided therein.
(h) Pending the issuance and sale of general obligation bonds, it may be necessary and in the
best interest of the County for the County Council to provide for the issuance and sale of general obligation
bond anticipation notes for the purposes of funding a portion of the projects approved in the Bond
Referendum in anticipation of the issuance of general obligation bonds of the County and the receipt of the
proceeds thereof.
Page 90 of 253
5
66361714 v1
(i) It is now in the best interest of the County for the County Council to provide for the
issuance and sale of general obligation bonds and general obligation bond anticipation notes of the County
pursuant to the aforesaid provisions of the Constitution and laws of the State in the aggregate principal
amount of not exceeding $25,000,000, the proceeds of which will be used for any of the purposes set forth
in Section 1(f), to pay costs of issuance of the Bonds (hereinafter defined) and Notes (hereinafter defined),
to pay principal and interest on the Notes and such other lawful purposes as the County Council may
determine.
SECTION 2. Authorizations and Details of Bonds. Pursuant to the aforesaid provisions of the
Constitution and laws of the State, there is hereby authorized to be issued general obligation bonds of the
County in the amount of not exceeding $25,000,000, in one or more series, in one or more years (the
“Bonds”), to obtain funds for any one or more of the purposes mentioned in Section 1(i) above.
The Bonds shall be issued as fully-registered bonds; shall be dated as of their date of delivery; shall
be in denominations of $5,000 or any integral multiple thereof not exceeding the principal amount of the
Bonds maturing in each year; shall be numbered from R-1 upward; shall bear interest at such times as
hereafter designated by the County Administrator of the County or his lawfully-authorized designee (the
“County Administrator”) at such rate or rates as may be determined at the time of the sale thereof; and shall
mature in annual installments as determined by the County Administrator.
Both the principal of and interest on the Bonds shall be payable in any coin or currency of the United
States of America which is, at the time of payment, legal tender for public and private debts. If publicly
traded, the Registrar/Paying Agent for the Bonds shall be a bank, trust company, depository or transfer
agent located either within or without the State named by the County. If privately placed, the
Registrar/Paying Agent for the Bond shall be the County.
SECTION 3. Authorizations and Details of Notes. Pursuant to the aforesaid provisions of the
Constitution and laws of the State, there is hereby authorized to be issued general obligation bond
anticipation notes of the County (the “Notes”) to obtain funds for any one or more of the purposes
mentioned in Section 1(j) above.
The Notes shall be fully registered; shall be dated their date of delivery; shall be in par
denominations or in denominations of $5,000 or any integral thereof not to exceed the par amount thereof;
shall be numbered R-1; and shall bear interest at such rate as may be determined by the County
Administrator at the time of the sale thereof.
Both the principal of and interest on the Notes shall be payable in any coin or currency of the United
States of America which is, at the time of payment, legal tender for public and private debts. If publicly
traded, the Registrar/Paying Agent for the Bonds or Notes shall be a bank, trust company, depository or
transfer agent located either within or without the State named by the County. If privately placed, the
Registrar/Paying Agent for the Bond or Note shall be the County. The Notes may be taxable or tax-exempt.
SECTION 4. Delegation of Authority to Determine Certain Matters Relating to Bonds and Notes.
The County Council hereby delegates to the County Administrator the authority to determine the following
for each series of Bonds or Notes: (a) the par amount thereof; (b) the forms thereof; (c) the maturity dates(s)
and the respective principal amounts maturing on such date(s); (d) the interest payment date(s); (e)
redemption provisions, if any; (f) the form of the Notice of Sale or Request for Proposals; (g) whether the
Bonds or Notes will be issued as taxable Bonds or Notes; (h) whether the Bonds or Notes will be publicly-
Page 91 of 253
6
66361714 v1
traded or placed with a bank; (i) the date and time of sale of the Bonds and Notes; (j) the Registrar/Paying
Agent therefor; and (k) the form of the Continuing Disclosure Certificate, if required.
The County Council hereby further delegates to the County Administrator the authority with respect
to each series of Bonds or Notes to receive bids on behalf of the County Council and the authority to award
the sale of the Bonds or the Notes to the lowest bidder therefor in accordance with the terms of a Notice of
Sale or to the bidder providing the bid in the best interest of the County in accordance with the terms of a
Request for Proposals.
SECTION 5. Registration, Transfer and Exchange of the Bonds or Notes. The County shall
cause books (herein referred to as the “registry books”) to be kept at the offices of the Registrar/Paying
Agent, for the registration and transfer of the Bonds or Notes. Upon presentation at its office for such
purpose, the Registrar/Paying Agent shall register or transfer, or cause to be registered or transferred, on
such registry books, the Bonds or Notes under such reasonable regulations as the Registrar/Paying Agent
may prescribe.
Each Bond or Note shall be transferable only upon the registry books of the County, which shall be
kept for such purpose at the principal office of the Registrar/Paying Agent, by the registered owner thereof
in person or by his duly authorized attorney upon surrender thereof together with a written instrument of
transfer satisfactory to the Registrar/Paying Agent duly executed by the registered owner or his or her duly
authorized attorney. Upon the transfer of any such Bond or Note, the Registrar/Paying Agent on behalf of
the County shall issue in the name of the transferee a new fully-registered Bond or Bonds or Note or Notes
of the same aggregate principal amount, interest rate and maturity as the surrendered Bond or Note. Any
Bond or Note surrendered in exchange for a new registered Bond or Note pursuant to this Section shall be
canceled by the Registrar/Paying Agent.
The County and the Registrar/Paying Agent may deem or treat the person in whose name any fully-
registered Bond or Note shall be registered upon the registry books as the absolute owner of such Bond or
Note, whether such Bond or Note shall be overdue or not, for the purpose of receiving payment of the
principal of and interest on such Bond and for all other purposes and all such payments so made to any such
registered owner or upon his order shall be valid and effectual to satisfy and discharge the liability upon
such Bond to the extent of the sum or sums so paid, and neither the County nor the Registrar/Paying Agent
shall be affected by any notice to the contrary. In all cases in which the privilege of transferring the Bonds
or Notes is exercised, the County shall execute and the Registrar/Paying Agent shall authenticate and deliver
Bonds or Notes in accordance with the provisions of this Ordinance. Neither the County nor the
Registrar/Paying Agent shall be obliged to make any such transfer of the Bonds or Notes during the fifteen
(15) days preceding an interest payment date on such Bonds or Notes.
SECTION 6. Record Date. The County hereby establishes a record date for the payment of
interest or for the giving of notice of any proposed redemption of the Bonds or Notes, and such record date
shall be the fifteenth (15th) day (whether or not a business day) preceding an interest payment date on such
Bond or Note or, in the case of any proposed redemption of Bonds or Notes subject to redemption, such
record date shall be the fifteenth (15th) day (whether or not a business day) prior to the mailing of notice of
redemption of the Bonds or Notes.
SECTION 7. Mutilation, Loss, Theft or Destruction of the Bonds or Notes. In case any Bond or
Note shall at any time become mutilated in whole or in part, or be lost, stolen or destroyed, or be so defaced
as to impair the value thereof to the owner, the County shall execute and the Registrar shall authenticate and
deliver at the principal office of the Registrar, or send by registered mail to the owner thereof at his request,
Page 92 of 253
7
66361714 v1
risk and expense a new Bond or Note of the same series, interest rate and maturity and of like tenor and
effect in exchange or substitution for and upon the surrender for cancellation of such defaced, mutilated or
partly destroyed Bond or Note, or in lieu of or in substitution for such lost, stolen or destroyed Bond or
Note. In any such event the applicant for the issuance of a substitute Bond or Note shall furnish the County
and the Registrar evidence or proof satisfactory to the County and the Registrar of the loss, destruction,
mutilation, defacement or theft of the original Bond or Note, and of the ownership thereof, and also such
security and indemnity as may be required by the laws of the State or such greater amount as may be
required by the County and the Registrar. Any duplicate Bond or Note issued under the provisions of this
Section in exchange and substitution for any defaced, mutilated or partly destroyed Bond or Note or in
substitution for any allegedly lost, stolen or wholly-destroyed Bond or Note shall be entitled to the identical
benefits under this Ordinance as was the original Bond or Note in lieu of which such duplicate Bond or Note
is issued, and shall be entitled to equal and proportionate benefits with all the other Bonds or Notes of the
same series issued hereunder.
All expenses necessary for the providing of any duplicate Bond or Note shall be borne by the
applicant therefor.
SECTION 8. Execution of the Bonds and Notes. The Bonds and Notes shall be executed in the
name of the County with the facsimile or manual signature of the Chair of County Council (the “Chair”)
attested by the facsimile or manual signature of the Clerk to County Council (the “Clerk”) under a facsimile
of the seal of the County which shall be impressed, imprinted or reproduced thereon. Neither the Bonds nor
the Notes shall be valid or become obligatory for any purpose unless there shall have been endorsed thereon
a certificate of authentication or registration. Each Bond or Note shall bear a certificate of authentication or
registration manually executed by the Registrar/Paying Agent.
SECTION 9. Form of the Bonds and Notes. The Bonds and Notes shall be in the forms
approved by the County Administrator.
SECTION 10. Investment Contracts. The County Council hereby authorizes the County
Administrator or the Georgetown County Treasurer (the “Treasurer”) to execute such investment
contracts and related documents as is determined to be in the best interest of the County; provided that all
such investments shall be permitted investments of public funds as provided in Sections 6-5-10 and 11-1-
60 of the S.C. Code.
SECTION 11. Eligible Securities. The Bonds and Notes initially issued (the “Initial Bonds or
Initial Notes”) may be eligible securities for the purposes of the book-entry system of transfer maintained by
The Depository Trust Company (“DTC”), and transfers of beneficial ownership of the Initial Bonds or
Notes may be made through DTC and its participants in accordance with rules specified by DTC. Such
beneficial ownership must be of $5,000 principal amount of the Bonds or Notes of the same maturity or any
integral multiple of $5,000 or the par amount of the Bonds or Notes.
If issued through DTC, the Initial Bonds or Initial Notes shall be issued in fully-registered form, one
Bond for each of the maturities of the Bonds or one Note in the par amount thereof, in the name of Cede &
Co., as the nominee of DTC. When any principal of or interest on the Initial Bonds or Notes becomes due,
the County shall transmit to DTC an amount equal to such installment of principal and interest. DTC shall
remit such payments to the beneficial owners of the Bonds or their nominees in accordance with its rules
and regulations.
Page 93 of 253
8
66361714 v1
Notices of redemption of the Initial Bonds or Initial Notes or any portion thereof shall be sent to
DTC in accordance with the provisions of the Ordinance.
If (a) DTC determines not to continue to act as securities depository for the Initial Bond or Notes, or
(b) the County has advised DTC of its determination that DTC is incapable of discharging its duties, the
County shall attempt to retain another qualified securities depository to replace DTC. Upon receipt by the
County of the Initial Bonds or Initial Notes together with an assignment duly executed by DTC, the County
shall execute and deliver to the successor securities depository Bonds or Notes of the same principal
amount, interest rate and maturity registered in the name of such successor.
If the County is unable to retain a qualified successor to DTC or the County has determined that it is
in its best interest not to continue the book-entry system of transfer or that interests of the beneficial owners
of the Bonds or Notes might be adversely affected if the book-entry system of transfer is continued (the
County undertakes no obligation to make any investigation to determine the occurrence of any events that
would permit it to make any such determination), and has made provision to so notify beneficial owners of
the Bonds or Notes by mailing an appropriate notice to DTC, upon receipt by the County of the Initial
Bonds or Initial Notes together with an assignment duly executed by DTC, the County shall execute,
authenticate and deliver to the DTC participants Bonds or Notes in fully-registered form, in the
denomination of $5,000 or any integral multiple thereof for the Bonds and the par amount of the Notes.
SECTION 12. Security for the Bonds and Notes. There is hereby pledged the net proceeds of the
Sales And Use Tax for the payment of the principal of and interest on the Bonds as they respectfully
maturity and to create such sinking fund as may be necessary therefor.
Additionally, the full faith, credit, resources and taxing power of the County are hereby irrevocably
pledged for the payment of the principal of and interest on the Bonds as they respectively mature and to
create such sinking fund as may be necessary therefor. If necessary, there shall be levied annually by the
Georgetown County Auditor and collected by the Treasurer in the same manner as County taxes are levied
and collected, a tax, without limit, on all taxable property in the County sufficient to pay the principal of and
interest on the Bonds as they respectively mature and to create such sinking fund as may be necessary
therefor.
The proceeds of the Bonds are pledged for the payment of the Notes as well as the full faith, credit,
resources and taxing power of the County.
SECTION 13. Defeasance. The obligations of the County under this Ordinance and the pledges,
covenants and agreements of the County herein made or provided for, shall be fully discharged and
satisfied as to any portion of the Bonds or Notes, and such Bond or Bonds or Note or Notes shall no
longer be deemed to be outstanding hereunder when:
(a) such Bond or Bonds or Note or Notes shall have been purchased by the County and
surrendered to the County for cancellation or otherwise surrendered to the County or the Paying Agent
and is canceled or subject to cancellation by the County or the Paying Agent; or
(b) payment of the principal of and interest on such Bonds or Notes either (i) shall have been
made or caused to be made in accordance with the terms thereof, or (ii) shall have been provided for by
irrevocably depositing with a corporate trustee to be named in trust and irrevocably set aside exclusively
for such payment (1) moneys sufficient to make such payment or (2) Government Obligations (hereinafter
defined) maturing as to principal and interest in such amounts and at such times as will ensure the
Page 94 of 253
9
66361714 v1
availability of sufficient moneys to make such payment and all necessary and proper fees, compensation
and expenses of the corporate trustee. At such time as the Bonds or Notes shall no longer be deemed to
be outstanding hereunder, such Bonds or Notes shall cease to draw interest from the due date thereof and,
except for the purposes of any such payment from such moneys or Government Obligations as set forth in
(ii) above, shall no longer be secured by or entitled to the benefits of this Ordinance.
“Government Obligations” shall mean any of the following:
(i) direct obligations of the United States of America or agencies thereof or
obligations, the payment of principal or interest on which, in the opinion
of the Attorney General of the United States, is fully and unconditionally
guaranteed by the United States of America;
(ii) non-callable, U.S. Treasury Securities - State and Local Government
Series (“SLGS”); and
(iii) a defeasance obligation as defined in Section 6-5-10 of the S.C. Code as
such as may be amended from time to time.
(c) Such Bond or Bonds or Note or Notes shall be defeased as provided in Section 11-14-110
of the S.C. Code as such may be amended from time to time.
SECTION 14. Exemption from State Taxes. Both the principal of and interest on the Bonds and
Notes shall be exempt, in accordance with the provisions of Section 12-2-50 of the S.C. Code, from all
State, County, municipal, school district and all other taxes or assessments, except estate or other transfer
taxes, direct or indirect, general or special, whether imposed for the purpose of general revenue or
otherwise.
SECTION 15. Sale of the Bonds and Notes; Form of Notice of Sale. The Bonds and Notes shall
be sold at a public sale. A Notice of Sale or Request for Proposals in the form approved by the County
Administrator or his designee shall be distributed to prospective bidders and a summary of such Notice of
Sale shall be published in a newspaper having general circulation in the State or in a financial publication
published in the City of New York, State of New York, or both, not less than seven (7) days prior to the
date set for such sale.
SECTION 16. Preliminary and Official Statement. The County Council hereby authorizes and
directs the County Administrator and the Chief Financial Officer (or the equivalent thereto) of the County
(the “Chief Financial Officer”) to prepare, or cause to be prepared, a Preliminary Official Statement to be
distributed to prospective purchasers of the Bonds or Notes, if necessary, together with the Notice of Sale.
The County Council authorizes the County Administrator to designate the Preliminary Official Statement as
“final” for purposes of Rule 15c2-12 promulgated by the Securities and Exchange Commission (the
“Rule”). The County Administrator and Chief Financial Officer are further authorized to see to the
completion of the final form of the Official Statement upon the sale of the Bonds or Notes, if necessary, so
that it may be provided to the purchaser of the Bonds or the Notes.
SECTION 17. Filings with Central Repository. In compliance with Section 11-1-85 of the S.C.
Code, the County covenants that it will file or cause to be filed with a central repository for availability in
the secondary bond market when requested: (a) a copy of the annual audit of the County within thirty (30)
days for the County’s receipt thereof; and (b) within thirty (30) days of the occurrence thereof, relevant
Page 95 of 253
10
66361714 v1
information of an event which adversely affects more than five (5%) percent of the revenues of the County
or the County’s tax base.
SECTION 18. Continuing Disclosure. If required, in compliance with the Rule, the County
covenants and agrees for the benefit of the holders from time to time of the Bonds or Notes to execute and
deliver prior to closing, and to thereafter comply with the terms of, a Continuing Disclosure Certificate.
In the event of a failure of the County to comply with any of the provisions of the Continuing Disclosure
Certificate, an event of default under this Ordinance shall not be deemed to have occurred. In such event,
the sole remedy of any bondholder, noteholder or beneficial owner shall be an action to compel
performance by the County.
SECTION 19. Deposit and Use of Proceeds. The proceeds derived from the sale of the Bonds or
Notes shall be deposited with the Treasurer in a special fund to the credit of the County and shall be applied
solely to the purposes for which the Bonds or Notes have been issued, including payment of costs of
issuance of the Bonds or Notes.
SECTION 20. Bank Placement. In the event it is determined to place a series of Bonds or Notes
with a bank, the requirements of Sections 11, 16 and 18 hereof shall not be applicable, and the County may
serve as Registrar/Paying Agent as described in Sections 2 and 3 hereof.
SECTION 21. Tax Covenants (tax-exempt debt only). The County hereby covenants and agrees
with the holders of the Bonds or Notes that it will not take any action which will, or fail to take any action
which failure will, cause interest on the Bonds or Notes to become includable in the gross income of the
holders for federal income tax purposes pursuant to the provisions of the Internal Revenue Code of 1986, as
amended, and regulations promulgated thereunder (the “Code”) in effect on the date of original issuance of
the Bonds or Notes. The County further covenants and agrees with the holders of the Bonds or Notes that
no use of the proceeds of the Bonds or Notes shall be made which, if such use had been reasonably expected
on the date of issue of the Bonds or Notes, would have caused the Bonds or Notes to be “arbitrage bonds,”
as defined in Section 148 of the Code, and to that end the County hereby shall:
(a) comply with the applicable provisions of Sections 103 and 141 through 150 of the Code
and any regulations promulgated thereunder so long as the Bonds or Notes are outstanding;
(b) establish such funds, make such calculations and pay such amounts, in the manner and at
the times required in order to comply with the requirements of the Code relating to required rebates of
certain amounts to the United States; and
(c) make such reports of such information at the time and places required by the Code.
Pursuant to an Ordinance No. 2013-05 adopted by the County Council on March 26, 2013, the
County has adopted Written Procedures related to Tax-Exempt Debt.
Page 96 of 253
11
66361714 v1
SECTION 22. Declaration of Intent to Reimburse Certain Expenditures. This Ordinance shall
constitute the County’s declaration of official intent pursuant to Regulation §1.150-2 of the Code to
reimburse the County from a portion of the proceeds of the Bonds or Notes for expenditures it anticipates
incurring (the “Expenditures”) with respect to the projects set forth in Section 1(f) hereof prior to the
issuance of the Bonds or Notes. The Expenditures which are reimbursed are limited to Expenditures
which are: (i) properly chargeable to a capital account (or would be so chargeable with a proper election
or with the application of the definition of placed in service under Regulation §1.150-2 of the Code) under
general federal income tax principals; or (ii) certain de minimis or preliminary Expenditures satisfying the
requirements of Regulation §1.150-2(f) of the Code. The source of funds for the Expenditures with
respect to these projects will be the County’s reserve funds. To be eligible for reimbursement of the
Expenditures, the reimbursement allocation must be made not later than 18 months after the later of (a)
the date on which the Expenditures were paid; or (b) the date such projects were placed in service, but in
no event more than three (3) years after the original Expenditures.
SECTION 23. Miscellaneous. The County Council hereby authorizes the Chair, the Clerk, the
County Administrator and the Chief Financial Officer to execute such documents as may be necessary to
effect the issuance of the Bonds or Notes. The County Council hereby retains Burr & Forman LLP as
Bond Counsel, Disclosure Counsel and Tax Counsel, Compass Municipal Advisors, LLC as Financial
Advisor, and AMTEC Corp. as Rebate Advisors, in connection with the issuance of the Bonds and the
Notes. The County Administrator is authorized to execute such contracts, documents or engagement
letters as may be necessary and appropriate to effectuate said engagements.
All rules, regulations, Ordinances and parts thereof, procedural or otherwise, in conflict herewith or
the proceedings authorizing the issuance of the Bonds or the Notes are, to the extent of such conflict, hereby
repealed and this Ordinance shall take effect and be in full force from and after its enactment.
Enacted this 12th day of May, 2026.
GEORGETOWN COUNTY, SOUTH CAROLINA
By:
Chair, County Council
(SEAL)
ATTEST:
Clerk to County Council
Date of First Reading: 3/24/26
Publication of Notice of
Public Hearing: 4/9/26
Date of Second Reading: 4/7/26
Date of Public Hearing: 5/12/26
Date of Third Reading: 5/12/26
Page 97 of 253
1
STATE OF SOUTH CAROLINA ) ORDINANCE 26-13______
COUNTY OF GEORGETOWN )
AN ORDINANCE TO AMEND ORDINANCE 2021-05 AND TO RATIFY,
AUTHORIZE, REALLOCATE, AND APPROVE EXPENDITURES
UNDER CAPITAL SALES TAX REVENUES
FOR COMMUNITY PROJECTS
WHEREAS, Georgetown County Council enacted Ordinance 2014-28 on August 12, 2014 to authorize a
ballot question for the implementation of a Capital Project Sales Tax, which was voted on and approved
by the voters of Georgetown County at the 2014 general election.
WHEREAS, the addition of a one cent sales tax (CPST) to be collected within Georgetown County beginning
May 1, 2015 with an end date of April 30, 2019 resulted in the collection of a surplus of capital project
sales tax proceeds of approximately $12.5 million dollars.
WHEREAS, as a result of the surplus funds, County Council passed Ord. 20-26 whereby, after all prior
projects submitted and approved are fully funded, and remaining balance of surplus collections were to
be held in account until such time as the County Council determines and ordains subsequent qualifying
projects.
WHEREAS, County Council, after due consideration further approved and authorized the allocation of
$7,000,000.00 of the 2014 capital project tax surplus collections enacted Ordinance No. 21-05.
WHEREAS, under Ordinance 21-05 projects identified as “Choppee Complex Auditorium Renovations”
were authorized and funded at $40426,323.00.
WHEREAS, the completion of the authorized proposed renovations improvements authorized for the
Choppee Complex Auditorium project will exceed the authorized and funded sum of $404,323.00total
$511,323, creating a shortfall which is reasonably expected to be approximately $85,000.of $85,00000
from the originally authorized and funded total for this project.
WHEREAS, several authorized and funded projects have been completed, with total project cost savings
of $87,124.59, resulting leavi in ng excess funds authorized for these projects unspent and available and
unspent as followsshown.
p. Lanes Creek Park Improvements authorized $45,800 improvements completed at a total of
$26,950.03, resulting in unspent project cost savings of $18,849.97.
r. Plantersville Park Improvements authorized $45,000 improvements completed at cost of
$25,966.38, resulting in unspent project cost savings of $19,033.62.
t. Oatland, St Paul and Pee Dee Improvements authorized $70,800 improvements completed at a
cost of $21,559, resulting in unspent project cost savings of $49,241.
Page 98 of 253
2
THEREFORE, Georgetown County Council hereby ratifies, authorizes, reallocates, and approves the
following projects and expenditures of funds from surplus CPST collections for purposes authorized under
S.C. Code § 4-10-330 (A)(1), as follows:
A. Under Ordinance 21-05:
Section 1, 3. n., Choppee Complex Auditorium Renovations
$404511,323.00
The original Pproject cost originally approved for $40426,323 is hereby increased up to the sum of the
total cost savings of $87,124.59. by $85,000, The and the additional necessary sums and expenditures are
ratified and authorized to permit completion of theis project utilizing unspent funds resulting from project
cost savings realized on projects within District 7 and from the 2014 capital project tax surplus
collectionsupon completion of projects within District 7.
B. Project cost savings, in Tthe amount of $85,000, realized from the above referenced Project cost
savingsupon completion of authorized projects as defined below of $87,124.59 are hereby approved
and authorized to be utilized for completion of Choppee Complex Auditorium:
p. Lanes Creek Park Improvements authorized $45,800 improvements completed at a total of
$26,950.03, resulting in unspent project cost savings of $18,849.97.
r. Plantersville Park Improvements authorized $45,000 improvements completed at cost of
$25,966.38, resulting in unspent project cost savings of $19,033.62.
t. Oatland, St Paul and Pee Dee Improvements authorized $70,800 improvements completed at a
cost of $21,559, resulting in unspent project cost savings of $49,241.
This ordinance and allocation of surplus proceeds is made in accordance with South Carolina Code of Laws
4-10-340, and the projects and purposes stated herein are authorized by and conform to SCto SC Code 4-
10-330(A)(1).
That the remaining balance of 2014 surplus collections, if any, be held in account without expenditure
until such time as the Georgetown County Council may determine and authorize subsequent projects for
which the surplus may be disbursed.
The County Administrator and staff are authorized to implement the mandates of this Ordinance and shall
set aside, account, and disburse funds utilizing the normal course of business and practice methods of
Georgetown County.
Should a court of competent jurisdiction declare any part of this ordinance invalid, such declaration shall
not affect this ordinance as a whole or any part hereof except that specific provision declared to be invalid.
Any ordinance or parts of any ordinance in conflict with this ordinance or inconsistent with its provisions
are to the extent necessary and allowed by law repealed or superseded to give this ordinance full force
and effect.
Page 99 of 253
3
This ordinance shall become effective immediately upon its final approval.
ORDAINED, RATIFIED, AND ADOPTED THIS 12th __ DAY OF MAY_____________, 2026.
_______________________________________________(Seal)
Clint Elliott, Chairman, Georgetown County Council
ATTEST:
_______________________________________________
Alma D. Sierra, Clerk to Council
First Reading: ___________________________04/07/2026
Second Reading: ___________________________04/21/2026
Third Reading: ___________________________
05/12/2026
Page 100 of 253
Item Number: 10a
Meeting Date: 5/12/2026
Item Type:First Reading
Agenda Request Form
Georgetown Planning
Commission
DEPARTMENT: Planning Department
ISSUE UNDER CONSIDERATION:
Ordinance No. 26-15– to rezone two (2) parcels totaling approximately 90.21 acres located on
the western side of Brick Chimney Road, approximately 678 feet north of Highmarket Street in
Georgetown from Forest Agriculture (FA) and Limited Industrial (LI) to a Planned Development
(PD). TMS#s 02-0422-011-10-02 and 02-0422-011-08-00. Council District 5
CURRENT STATUS:
The parcels were previously operated as a timber tract; they are forested and/or recently
timbered and currently split-zoned between FA (approximately 81.03 acres) and LI
(approximately 9.18 acres). The LI is closer to the CSX railroad tracks.
POINTS TO CONSIDER:
1. The developer proposes to rezone the two parcels from FA and LI to a Planned
Development to develop 272 single-family home sites, a commercial/limited
industrial area, and a master amenity, along with open space. A PD is “intended to
be used to encourage the application of new techniques and technology to
community development, which will result in superior living or development
arrangements with lasting values. It is further intended to achieve economics in
land development, maintenance of street systems and utility networks while
providing building groupings for privacy, usable, attractive open space, buffer
zones, safe circulation and the general well-being of the inhabitants.”
2. The PD will consist of 182 SF, Type A (50x150) and 90 SF, Type B (30x110) lots,
as well as a 5.9 acre commercial/industrial site, with the following allowed uses:
neighborhood market, food and beverage, convenience retail establishments,
professional services, personal services, office uses or other retail uses, boat,
camper and outdoor trailer storage and trade shops.
3. Proposed dimensional standards for the Brick Chimney Road PD are as follows:
Page 101 of 253
Permitted
Uses
Min.
Site
Area Sq
Ft
Setbacks (feet) Max
Height
Impervious
Surface
Separation*
of Structure
Front Sides Rear Corner
Single Family
Detached
“Type A”
7,500 20’ 5’ 10’ 7.5’ 35 66% 10’
Single Family
Detached
“Type B”
3,300 20’ 5’ 10’ 7.5’ 35 66% 10’
Amenities 500 10’ 10’ 10’ 7.5’ 35 N/A 10’
Commercial 5,000 25’ 10’ 15’ 7.5’ 35 70% 20’
*Minimum wall-to-wall separation for single-family homes shall be ten (10) feet.
4. The Type B single-family lots (3,300 sf) are smaller than the smallest lot area
allowance in the County’s conventional zoning districts (Resort Residential (RR) at
5,000 sf). The smallest lot width is also found in RR at 50 feet.
5. The typical impervious-to-pervious ratios for single-family & commercial structures
are as follows:
Single-family – N/A – no maximum ratios
Commercial – 70/30% (Article VII, Footnote 10)
6. The proposed design and rezoning to a PD will allow for restrictive covenants over
the neighborhood (see the Brick Chimney Road PD Narrative for more details).
7. Parking for residential is proposed at 2 spaces per Type A unit and 1 space per
Type B unit. Parking for the commercial site will meet the minimum requirements
of the Zoning Ordinance (Article XI).
8. Surrounding tracts to the north and west are zoned Forest Agriculture (FA), tracts
to the south and southwest are Limited Industrial (LI), and tracts to the east and
south are zoned One-Half Acre Residential (R-1/2 Ac). Existing uses include
industry, residential homes, forested vacant land and farmlands. The closest
residential property is adjacent to the parcel to the east along Brick Chimney Road.
(see Zoning and Aerial Maps).
9. Access to the project will be from Brick Chimney Road (a state-maintained road),
with an internal road system built to service the residents. The interior roadways
within the project are anticipated to be public roads, with a minimum of 50’ rights-
of-way, and 5’ sidewalks. Secondary access will be via Gapway Road (a state-
maintained road). A third access is proposed via Brick Chimney Road for the
Page 102 of 253
commercial/industrial shops. Encroachment permits will be required by SCDOT
for all three accesses.
10. A Traffic Impact Analysis (TIA) is required for this subdivision because it exceeds
the minimum threshold of 500 Average Daily Trips (ADT). Access Engineering
conducted the study and a report was submitted to staff for review and to make
sure that post-development ADT did not create an unacceptable Level of Service
(LOS) rating. This development shows approximately 2,926 ADTs (see inserts
from the TIA in the packet). The study recommended that a westbound 100-foot
storage right-turn lane is warranted on Highmarket Street approaching Brick
Chimney Road. No changes are recommended for the Gapway Road
intersection. Left turn lanes are already present on Highmarket Street at both the
Gapway and Brick Chimney Road median openings. Results of the analysis
indicate that the studied intersections currently operate, and are expected to
continue to operate, at an acceptable LOS. The buildout indicates a (D) LOS
rating going southbound from Brick Chimney to Highmarket Street. (see inserts
from the TIA in packet).
11. Buffers are not required against existing vacant or residential properties. Other
surrounding tracts are either residential properties or forested lands, so a buffer
will not be required adjacent to this proposed PD. However, the developer is
proposing a 25’ undisturbed buffer along Brick Chimney Road, the railroad and a
portion of the western boundary. A (level 4) 20’ buffer is required between the
residential and commercial uses.
11. There are 3.52 acres of wetlands on the property that are not proposed to be
filled. In addition, the developer is proposing a 15’ buffer adjacent to the wetlands.
13. A tree survey overlaid on the site plan shows a total of 33 protected trees on the
site. Twelve of those are classified as grand trees over 24” DBH. The Tree
Regulations Ordinance (Art. XIII, Sec. 1301.7) states that Grand Trees must have
approval from the Zoning Board of Appeals (ZBA) to be removed before any land
clearing or development in a subdivision takes place. No grand trees are proposed
to be removed. The developer is proposing to follow the requirements of Article
XIII of the Zoning Ordinance.
14. Signage for the commercial/industrial area will comply with the General
Commercial standards. No signage information has been provided for the
residential portion.
Page 103 of 253
15. A Utility Coordination Committee (UCC) meeting was held on 3/31/26 at 10:00
AM, in which all applicable parties were represented, and no major issues were
discussed with the proposed project. Overall, utility services could all be
connected to and served by this development via access from main lines on either
Brick Chimney Road or Gapway Road. Cable/internet providers stated they would
coordinate with the water and sewer utilities to run lines parallel in the right-of-
way.
16. Georgetown County Fire was contacted about the 10’ separation between the
single-family home sites. They agreed that this is allowable by the fire code as
long as they have access between the structures. Roadways within the PD will need
to be approved.
17. A fully engineered Stormwater Plan must be submitted and approved before any
land disturbance. Georgetown County Stormwater “Letter of Coordination” has
been provided.
18. Gravity Sewer abuts the parcel on Gapway Road, and a small force main abuts the
property for about 1,000 feet along Brick Chimney Road. The Rural Water
District provides water service.
19. This parcel is listed on the FIRM map as Zone X, so it is not in a regulated flood
zone.
20. The Future Land Use (FLU) map designates this property as both Residential
Mixed Use (RMU) and Employment (EMP) (see FLU map). RMU allows for an
appropriate transition between highly traveled corridors and existing and planned
residential neighborhoods. RMU primarily consists of single-family and attached
housing, along with a mixture of neighborhood-serving or low-impact commercial
and institutional uses. EMP allows for uses such as industrial manufacturing,
corporate offices, technology, distribution, craft and maker spaces, and similar
uses. The proposed PD rezoning is intended to be used as a mixed-use community
with a Net Density of 4.81 units per acre, which is considered medium density.
The FLU map supports this request.
21. The final plat for this major subdivision development will need to be reviewed and
approved by the Planning Staff prior to any building permits being approved.
CONCLUSION: The proposed Brick Chimney Road PD has the potential to bring much-needed
workforce housing to the rural Georgetown region. The development was designed to encompass
different housing types to accommodate a range of housing price points. While this rezoning
Page 104 of 253
would increase the density currently allowed on this tract by about 3.1 units per acre, the FLU
map supports high density for a portion of the tract. The development as proposed, indicates
medium density.
If the proposed PD Zoning is recommended to Council, staff proposes the following conditions:
1. Final approval letters will be needed from GTC Stormwater, GCWSD, Rural Water
District, GTC Fire, and SCDOT before the start of development.
2. Financial guarantees in the form of a Letter of Credit or Cash Bond will be required for all
infrastructure improvements if lots are to be sold prior to infrastructure
completion. GCWSD and/or Rural Water may request this separately.
3. Acceptance of the Traffic Impact Analysis (TIA).
4. A tree removal and replacement plan shall be submitted and approved prior to construction.
5. Street names will need to be approved by the Planning Commission prior to final plat
approval.
6. Signage for the residential subdivision will be limited to two (2) at each entrance with a
maximum square footage of 40 sf at each.
7. Criteria for affordability should be based on the Land Use Element of the Comprehensive
Plan and should provide at least 20% of the total units (54 units) as workforce housing
(120% AMI). Details for affordability requirements may be addressed between the
applicant and the County with a Memorandum of Understanding (MOU) or other
agreement.
A public hearing was held on April 16, 2026. Seven people publicly spoke against the
project citing issues such as traffic, speeding on Brick Chimney Road, flooding,
stormwater, high density, marketing campaign, trash, gas station or liquor store in the
commercial area, etc. After discussion, the Planning Commission recommended denial for
the request on grounds of too much density for this area. The vote was 5-0 to deny the
rezoning request, with the chairman abstaining from the vote.
FINANCIAL IMPACT:
N/A
OPTIONS:
1. Approve rezoning request
2. Approve an amended request
3. Defer for further information
4. Remand to PC for further study
5. Deny request
STAFF RECOMMENDATIONS:
Recommendation to deny the rezoning request along with the recommendation from the
Planning Commission on 4/16/26.
ATTORNEY REVIEW:
Yes
Page 105 of 253
ATTACHMENTS:
1. rze2026-00110 packet
2. Rezoning Ordinance McClary Tract
Page 106 of 253
Page 107 of 253
Page 108 of 253
Page 109 of 253
Page 110 of 253
Page 111 of 253
Page 112 of 253
Page 113 of 253
Page 114 of 253
Page 115 of 253
Page 116 of 253
Page 117 of 253
Page 118 of 253
Page 119 of 253
Page 120 of 253
Page 121 of 253
Page 122 of 253
Page 123 of 253
Page 124 of 253
Page 125 of 253
Page 126 of 253
Page 127 of 253
Page 128 of 253
Page 129 of 253
Page 130 of 253
Page 131 of 253
Page 132 of 253
Page 133 of 253
Page 134 of 253
Page 135 of 253
Page 136 of 253
Page 137 of 253
Page 138 of 253
Page 139 of 253
Page 140 of 253
Page 141 of 253
Page 142 of 253
Page 143 of 253
Page 144 of 253
Page 145 of 253
Page 146 of 253
Page 147 of 253
Page 148 of 253
Page 149 of 253
Page 150 of 253
Page 151 of 253
Page 152 of 253
Page 153 of 253
Page 154 of 253
Page 155 of 253
Page 156 of 253
Page 157 of 253
Page 158 of 253
STATE OF SOUTH CAROLINA )
) ORDINANCE NO._____
COUNTY OF GEORGETOWN )
AN ORDINANCE TO AMEND THE ZONING MAP OF GEORGETOWN
COUNTY REGARDING TMS NUMBERS 02-0422-011-10-02 and 02-0422-011-08-
00, LOCATED ON THE WEST SIDE OF BRICK CHIMNEY ROAD
APPROXIMATELY 678 FEET NORTH OF HIGHMARKET STREET IN
GEORGETOWN, FROM FOREST AGRICULTURE (FA) AND LIMITED
INDUSTRIAL (LI) TO A PLANNED DEVELOPMENT (PD).
BE IT ORDAINED BY THE COUNTY COUNCIL MEMBERS OF
GEORGETOWN COUNTY, SOUTH CAROLINA, IN COUNTY COUNCIL
ASSEMBLED TO AMEND THE ZONING MAP OF GEORGETOWN COUNTY,
SPECIFICALLY TMS NUMBERS 02-0422-011-10-02 and 02-0422-011-08-002
APPROXIMATELY 90.21 ACRES LOCATED ON THE WEST SIDE OF BRICK
CHIMNEY ROAD APPROXIMATELY 678 FEET NORTH OF HIGHMARKET
STREET IN GEORGETOWN, FROM (FA) AND (LI) TO (PD) AS REFLECTED
ON THE ATTACHED MAP AND INCLUDING THE ATTACHED NARRATIVE
ALONG WITH THE FOLLOWING CONDITIONS:
1. Final approvals provided from all necessary regulatory agencies
2. Acceptance of the Traffic Impact Analysis
3. A tree removal and replacement plan shall be submitted and approved prior to
construction.
4. Signage for the residential subdivision will be limited to two at each entrance with
a maximum square footage of 40 square feet each.
5. Criteria for affordability will be based on the Land Use Element of the
Comprehensive Plan and shall provide at least 20% of the total units as workforce
housing (120% of area median income). Details for affordability requirements
shall be addressed between the applicant and Georgetown County with a
Memorandum of Understanding (MOU) or other agreement.
DONE, RATIFIED AND ADOPTED THIS __________ DAY OF ____________________,
2026.
___________________________________ (SEAL)
Clint A. Elliott
Chairman, Georgetown County Council
ATTEST:
___________________
Alma D. Sierra
Page 159 of 253
Clerk to Council
This Ordinance, No. ___________ has been reviewed by me and is hereby approved as to
form and legality.
_____________________________________
Jay Watson
Georgetown County Attorney
First Reading: _______________________________
Second Reading: _____________________________
Third Reading: _______________________________
Page 160 of 253
STATE OF SOUTH CAROLINA )
) ORDINANCE NO._____
COUNTY OF GEORGETOWN )
AN ORDINANCE TO ADOPT A WETLAND PROTECTION ORDINANCE AND
AMEND ARTICLE VIII (SEC. 809) AND ARTICLE XII (SECTION 1206) OF
THE ZONING ORDINANCE OF GEORGETOWN COUNTY TO ADD BUFFERS
AND PROTECTIONS TO COUNTY WETLANDS
WHEREAS, the Zoning Ordinance may be amended from time to time as defined in
Article XVII, Section 1700; and,
WHEREAS, the Authority and Enactment Clause of the Zoning Ordinance states that
to promote the health, safety, morals, and general welfare of the
community we should protect areas subject to periodic flooding against
development, in accordance with the comprehensive plan; and,
WHEREAS, Georgetown County (“County”) has an interest in the periodic review of
its ordinances and Land Development Regulations to address outdated
regulations with amendments to meet changing community standards for
new developments, to assist in the implementation of the County’s
Comprehensive Plan, and to better serve the public; and,
WHEREAS, after due deliberation and consideration, Georgetown County Council
hereby finds and declares that the public interest, stewardship, and general
welfare of the residents of the County will be served through the creation
of procedures for the protection, conservation, enhancement, and proper
maintenance of all existing wetlands and wetland buffer areas within the
County and for the protection of existing wetlands and wetland buffer
areas from encroachment, degradation, alteration, or elimination so
wetlands exist, thrive, flourish, and are regenerated; and,
WHEREAS, the County acknowledges that wetlands are essential for healthy
functioning of our ecosystem services and coastal biodiversity, and hold
significant connections to our natural and cultural heritage. These
protections are an integral part of the County’s broader surface and
groundwater management plans; and,
WHEREAS, wetland buffers, also known as vegetated or riparian buffers, provide a
transition between uplands and wetlands and are essential to preserving
the health of wetlands and waterways. In addition to supplementing and
enhancing the benefits of wetlands listed above, wetland buffers serve the
additional purpose of facilitating wildlife movement to other habitats
(“wildlife corridors”); and,
Page 161 of 253
WHEREAS, the County finds that wetland protections are also a crucial part of the
Resiliency Element of the County’s Comprehensive Plan in anticipation of
more frequent and severe storm events, as well as documented and
projected sea level rise (SLR); and,
WHEREAS, the Planning Commission held a public hearing on the proposed text
amendments for the Wetlands Protection Ordinance at their meeting on
April 16, 2026, and received a favorable vote to recommend the
amendments to Council; and,
WHEREAS, after due deliberation and consideration, the Georgetown County Council
has determined that it is in the best interest of good government and the
County of Georgetown and the Citizens of Georgetown County to amend
and adopt this ordinance to provide for the protection of the aquatic
systems in and around Georgetown County as provided herein; and,
WHEREAS, in light of these stated findings and purposes, and in keeping with the
updated Georgetown County Comprehensive Plan, including the Land
Use, Natural Resources, and Resiliency Elements (2024), the County
enacts the Wetland Protection Ordinance (WPO) to incorporate wetland
area protections into all of Georgetown County’s land use, planning,
zoning, and development approval procedures.
NOW THEREFORE, BE IT ORDAINED AND DECREED BY THE COUNTY
COUNCIL OF GEORGETOWN COUNTY, SOUTH CAROLINA, IN COUNTY
COUNCIL DULY ASSEMBLED, THAT ARTICLE VIII (SECTION 809) BE
AMENDED AS FOLLOWS:
ARTICLE VIII
809 Setbacks from Wetlands. A minimum fifteen (15) foot setback shall apply from the
edge of any salt water marsh wetlands line as determined by DHEC/OCRM.
809 Wetland Buffers and Setbacks. To promote the preservation and conservation of
Georgetown County’s natural resources and many wetland habitats, the following
provisions for wetland buffers and wetland setbacks shall apply to any development on
newly subdivided parcels adjacent to a fresh or saltwater wetland. (Amended Ord 2026-XX)
809.1 Wetland Buffers. A minimum thirty-five (35) foot buffer area shall apply
from the edge of any saltwater marsh wetland line as determined by
SCDES-BCM, and/or any freshwater wetland line as determined by the
Army Corp of Engineers (USACE). Specific wetland buffer areas and
setbacks can be found in Section VIII of the Wetland Protection
Ordinance.
Page 162 of 253
809.2 Wetland Setbacks. Setbacks for all buildings and structures as shown in
Article VII (Area, Yard, and Height Requirements) of this ordinance still
apply in addition to the wetland buffer areas. A minimum fifteen (15) foot
setback shall still apply for previously platted lots of record if located on
the edge of any salt water marsh wetlands as determined by SCDES-BCM.
BE IT FURTHER ORDAINED AND DECREED BY THE COUNTY COUNCIL
OF GEORGETOWN COUNTY, SOUTH CAROLINA, IN COUNTY COUNCIL
DULY ASSEMBLED, THAT ARTICLE XII (SEC. 1206) BE AMENDED TO ADD
THE FOLLOWING:
ARTICLE XII
1206 Wetland Buffers. All wetland buffers are pursuant to the Wetland Protection
Ordinance (WPO) in Article XXIV.
NOW THEREFORE, BE IT FURTHER ORDAINED BY THE COUNTY
COUNCIL OF GEORGETOWN COUNTY, SOUTH CAROLINA, IN COUNTY
COUNCIL DULY ASSEMBLED, THAT THE WETLAND PROTECTION
ORDINANCE (WPO) BE ADDED AS ARTICLE XXIV TO THE GEORGETOWN
COUNTY ZONING ORDINANCE AS FOLLOWS:
GEORGETOWN COUNTY, SOUTH CAROLINA
WETLAND PROTECTION ORDINANCE
I. TITLE & EFFECTIVE DATE
a. Title. This Ordinance is hereby officially known and cited as the Wetland
Protection Ordinance of Georgetown County, South Carolina. References
herein to “the Ordinance” or “this Ordinance” shall be interpreted as
references to this Wetland Protection Ordinance.
b. Effective Date. This Ordinance shall take effect and be in force from and
after the date of its adoption by the County Council of Georgetown
County, adopted this __ day of ___________, 2026.
II. AUTHORITY; CONFLICT; ABROGATION; SEVERANCE
a. Authority. This Ordinance is enacted pursuant to the authority conferred
upon Georgetown County by the South Carolina General Assembly to
adopt regulations designed to promote the public health, safety, and
general welfare of its citizenry.
Page 163 of 253
b. Conflict of Laws. This Ordinance shall be construed to not conflict with
any provision of state or federal law. However, the provisions of this
Ordinance shall control if more restrictive than other local, state, or
federal laws or regulations.
c. Abrogation. This Ordinance is not intended to repeal, abrogate, annul,
impair, or interfere with any existing easements, covenants, deed
restrictions, ordinances, rules, regulations, or permits previously adopted
or issued pursuant to law.
d. Severance. If any portion of this Ordinance is held legally invalid by a
court of competent jurisdiction, all remaining provisions shall continue to
be of full force and effect.
III. FINDINGS
a. Georgetown County’s Wetland Resources. The County of Georgetown is
home to five (5) rivers and two (2) major estuaries that are surrounded
and supported by a vast network of fresh and saltwater wetlands. There
are 249,336 acres of wetlands in Georgetown County, 48% of the land
area, and over half of those are considered forested/shrub wetlands,
followed by freshwater emergent wetlands (13%), and estuarine and
marine wetlands (12%).
b. Benefits of Wetlands. Healthy wetlands are vitally important, biologically
diverse ecosystems that regulate water quality and quantity. Wetland
functions support ecological and economic health and contribute to the
public health, safety, and welfare of the Georgetown community. These
unique areas are not only essential to the overall health of the
environment, but also have the capacity to address local water-related
problems that affect Georgetown County. Benefits of wetlands include
the following functions and values:
i. Flood control and mitigation. Wetlands serve the vital ecological
function of flood control and water retention during flood and
rain events through hydrologic absorption and stormwater flow
regulation. Their topography and location allow them to capture,
store, and slowly release water, providing protection for people,
property, and infrastructure. Natural wetlands are more cost-
effective and efficient at addressing flooding concerns than
engineered stormwater infrastructure.
ii. Storm protection and erosion control. Wetlands provide natural
protection from hurricanes, storm events, and erosion. Their
vegetation and spongy soils stabilize waterways by reducing water
velocity, preventing stream scour and bank erosion. Deeply-
Page 164 of 253
rooted wetland vegetation stabilizes soils and protects shorelines
from erosive forces such as wind and water. Through their erosion
control function, wetlands also help to conserve soil and water for
farms and forests.
iii. Water quality. Water quality is a County-wide environmental
issue. The wetlands and coastal marshes serve two very
important mitigation functions for the region. The Carolina
wetland regions have an ability to act like large natural sponges,
absorbing and holding water, and then slowly releasing it through
the canals and tributaries. As waters slowly flow downstream,
wetlands help trap and filter out sediments in the water,
improving nearby water quality. Detailed information on the
coastal wetlands of the Waccamaw region can be found in the
208 Water Quality Management Plan.
iv. Pollution control and filtration. Wetlands naturally remove
harmful nutrients and pollutants from the environment through
biological degradation and chemical oxidation. The natural friction
wetlands create slows down water flows, allowing suspended
sediments to settle. Nutrients from sources like fertilizers, leaking
septic systems, sewage, and manure, can then be removed from
the environment through vegetation uptake or microorganism
absorption. Wetlands are also effective at removing heavy metals
(e.g. lead-Pb) from runoff.
v. Habitat. Wetlands are some of the most biologically diverse
ecosystems in the world, comparable to tropical rainforests and
coral reefs in their species diversity. Wetlands provide spawning,
nesting, breeding, feeding, and migration habitat for a wide
variety of plants, birds, mammals, amphibians, reptiles,
crustaceans, insects, and microorganisms, including rare,
endangered, and threatened species. Coastal wetlands indirectly
support the fishing industry by providing habitat and nursery
grounds for economically valuable aquatic species like fish,
shrimp, and crabs.
vi. Recreation, tourism, and aesthetics. Wetlands provide unique
spaces for a variety of recreational activities, including hiking,
boating, fishing, hunting, birdwatching, wildlife viewing, and
photography.
vii. Groundwater. Groundwater-connected wetlands receive and
recharge groundwater, contributing to healthy aquifers and
Page 165 of 253
maintaining drinking water supplies for communities. A healthy
range of wetlands supports overall watershed health.
viii. Education and scientific research. Wetlands are naturally
occurring classrooms and laboratories, providing excellent
opportunities for education and scientific research on a wide
range of topics, including soil types, water quality, and unique
species of plants and animals.
ix. Carbon sequestration. Wetlands are heavily vegetated with plants
that remove carbon dioxide from the air. Unlike other
ecosystems, the characteristic wet conditions of wetlands prevent
rapid decomposition of organic matter, allowing carbon to be
stored long-term in the soil. In this way, wetlands help offset
human carbon emissions that are harmful to the global climate.
c. The Bureau of Coastal Management (BCM) within the S.C. Department of
Environmental Services (SCDES) protects and enhances the state’s coastal
resources by preserving sensitive and fragile areas while promoting
responsible development within the eight (8) coastal counties, including
Georgetown.
d. Loss of Wetlands. Loss of wetlands and uplands adjacent to wetlands is
contrary to the public health, safety, and welfare of Georgetown County
and its residents. Loss of wetland areas through the practice of filling in
wetlands and building on them has both direct and indirect
consequences, including the following:
i. Increased flooding. Filling wetlands reduces the natural water
absorption capacity of the land. Excess rainwater during flood and
rain events that would otherwise be absorbed or distributed
under normal conditions results in runoff and flooding, putting
people and structures at risk.
ii. Decreased water quality. Wetland loss decreases the ability of the
land to naturally remove pollutants from the environment.
Without absorption and vegetative uptake, pollutants are carried
downstream in high concentrations during rain and flood events.
iii. Increased erosion. As runoff and flooding increase, so does the
velocity of water flow. Fast-moving water has the power to
change the landscape of an area. In addition to scouring,
deepening, and re-routing of waterways, erosion can also
Page 166 of 253
threaten the structural integrity of existing homes, roads, and
other infrastructure.
e. Wetland Fluctuations. Wetlands are fluid, living ecosystems that
experience changes depending on the season. They may be more difficult
to identify during dry periods, giving a false sense of security that they
are suitable for development.
f. Existing Regulations. Unmitigated wetland loss and degradation are often
a function of unregulated human activity. Existing local, state, and
federal regulations do not fully contemplate or encompass all wetlands
within Georgetown County. In particular, the U.S. Environmental
Protection Agency (EPA) and the U.S. Army Corps of Engineers’ (USACE)
authority over wetlands is constrained by the Clean Water Act’s
definition of “waters of the United States,” and is constantly changing
and reforming through decades of administration changes, litigation, and
case law. These shifts do not always provide the clarity and uniformity
necessary to adequately protect and maintain healthy wetland systems
that are necessary for the safety and welfare of Georgetown County’s
residents, as well as for the maintenance of healthy wildlife populations.
South Carolina’s authority over wetlands is only through its indirect
authority in providing certifications that certain projects are consistent
with the state’s Coastal Management Programs; however, this authority
fails to capture projects that would degrade or destroy wetlands. In
addition, Georgetown County does not presently have any protections
for freshwater or isolated non-jurisdictional wetlands. Because the state
and federal regulations do not capture and therefore protect all the
valuable resources in Georgetown County, greater environmental
protection at the County level is needed to protect and preserve these
vital ecosystems.
g. Purpose. These standards are intended to regulate development and
activities in and around wetlands so as to:
1. Avoid the disturbance or alteration of wetlands wherever practicable;
2. Minimize any unavoidable alteration of wetlands;
3. Mitigate any loss of wetlands or wetland integrity by the revegetation
or restoration of altered wetlands, creation of new wetlands, and
conservation of existing wetlands;
4. Minimize erosion, sedimentation, and pollution of wetlands;
5. Limit the placement of fill-in and excavation of wetlands; and
6. Provide buffers along the perimeter of wetlands that will protect the
wetlands from impacts of adjacent development, allow for filtration of
stormwater runoff before it enters wetlands, and allow for scenic
wetland views.
Page 167 of 253
IV. DEFINITIONS
a. Adopted (effective) Date. Date in which this ordinance is adopted by 3 rd
reading of Georgetown County Council.
b. Agricultural Activities. The actions or practices involved in the cultivation
of crops, raising of animals, and the production of food, fiber, and other
goods from the land. This definition includes other terms such as
farming, livestock, aquaculture, agroforestry, horticulture, silviculture,
agronomy, and agro-processing.
c. Buffer. An area of non-disturbance adjacent to a delineated wetland
where natural vegetation must be maintained in order to protect the
wetland or its functions. Buffer widths are established pursuant to
Section VIII of this Ordinance.
d. Degraded Structure. Any building, wall, road, dock, water control device,
or other structure of any kind that the Zoning Administrator or Building
Official determines to be more than fifty percent (50%) destroyed or
damaged.
e. Development. The planning for or carrying out of a building activity or
mining operation, the making of a material change in the use or
appearance of any structure or property, or the dividing of land into
three (3) or more parcels.
f. Dilapidated Structure. Any building that has fallen into disrepair from
neglect or decay, and is otherwise in a state of partial ruin to an extent
that the structure is a hazard to the health, safety, or welfare of the
general public.
g. Disturbance. Any human-made land alterations, disturbances, or
construction activities, including, but not limited to, filling; clearing;
grading; dredging; excavating; draining; construction; mining; removal of
peat, sand, gravel, or other sediment; altering the water level or water
table; altering surface drainage characteristics, sediment patterns, or
flood retention characteristics; installation of septic tanks; or any other
alteration or use of wetland areas.
h. Encroachment. The act of a person advancing development beyond an
established limit, such as a critical line, buffer area, or setback.
i. Feasible Alternative to Wetlands Fill. Applies to location and/or sites of a
specific tract, methods of design or construction, and includes a “no
Page 168 of 253
action” alternative. Feasibility in each case is based on the best available
information, including but not limited to, technical input from a licensed
consultant, and consideration of factors of environmental and economic
suitability of the proposed activity and its alternatives. Based on the
analysis of the professional environmental consultant, and any feasible
alternative, such as mitigation methods or Best Management Practices
(BMP) to the acceptance of wetland fill, will be at the discretion of the
Zoning Administrator.
j. Grandfathered. A policy or provision in which an old development
regulation continues to apply to most existing situations while a new
regulation will apply to all future cases of development (also see Article
VIII, Section d.).
k. Nonconforming. Any use, activity, or structure in operation or existence
on the date of this Ordinance that would otherwise not be permissible
according to the terms herein.
l. Non-conforming Lots. All developed lots and all undeveloped but
recorded existing lots of record pursuant to [effective date], which do not
comply with the buffer and/or setback requirements of this Ordinance
shall be “grandfathered” as legal non-conforming lots.
m. Open Waters. Open waters habitat includes main river channels and
portions of lakes and backwaters that remain permanently flooded all
year and appear less than 10% vegetated.
n. Person. Any individual, firm, partnership, association, trust, corporation,
company, organization, or legal entity of any kind, whether public or
private, including municipal corporations, governmental agencies, or
subdivisions thereof.
o. Professional Environmental Consultant. An environmental consultant,
such as a scientist, surveyor, or engineer who studies, manages, designs,
and/or conserves wetlands by delineating their boundaries, assessing
their health, and developing restoration or mitigation plans to reduce
impacts on these wetland ecosystems.
p. Public Interest. As used herein, public interest, also referred to as
“overriding public interest” must be demonstrated by all applicants as a
prerequisite to a wetland mitigation or fill application approval of more
than one (1) acre. Public interest is defined as a purpose that directly
benefits the welfare or the well-being of the community at large as
opposed to benefiting a singular person, organization, or entity.
Page 169 of 253
q. Water Dependent. A use or activity which can be carried out only on, in,
or adjacent to water areas because the use requires access to the water
body for water-borne transportation, recreation, energy production, or
source of water.
r. Water Control Devices. Dams, bulkheads, retaining walls, terraces,
sluices, culverts, dikes, berms, levees, ditches, farm pounds, or any other
human-made device or structure designed to regulate the natural flow of
water.
s. Wetland(s). Those areas that are inundated or saturated by surface or
groundwater at a frequency and duration sufficient to support, and that
under normal circumstances do support, a prevalence of vegetation
typically adapted for life in saturated soil conditions.
Wetlands are identified and characterized by three things: (1)
predominantly hydric soils, meaning soils that are formed under wet
conditions; (2) species of plants that tolerate wet conditions
(hydrophytes); and (3) the presence of water above or just below the soil
surface. Wetlands generally include lands and waters meeting this
definition, and encompass areas referred to as swamps, marshes, tidal
flats, bays, bogs, estuaries, and other similar areas as determined by
SCDES and USACE.
i. Jurisdictional Wetlands. The U.S. Army Corps of Engineers
determines whether wetlands qualify as “waters of the United
States” through the Corps Wetland Delineation Manual and
Southeast Supplement. Federal case law on what constitutes
“waters of the United States” continues to evolve. For that
reason, local governments need consistency in determining what
areas are entitled to protection outside of the Corps’ regulatory
authority.
ii. Non-jurisdictional (isolated) Wetlands. Wetlands falling outside
the purview of “waters of the United States” are still “wetlands”
and provide the same benefits and environmental services as
jurisdictional wetlands. This Ordinance contemplates protections
for both jurisdictional and non-jurisdictional (isolated) wetlands.
t. Wetland Application. A document prepared by the County and provided
to the owner(s) of the property, or their agent, that acts as a request for
a permit to develop near a wetlands area. Once approved, the
Page 170 of 253
wetlands application becomes the wetlands permit and is then
considered legally binding.
u. Wetland Delineation. A report, identifying and evaluating the
boundaries, location, limits, area, and quality of all on-site wetlands,
with such delineation to be conducted in accordance with the “Corps of
Engineers Wetlands Delineation Manual,” technical report: Y-87-1, from
1987. The wetland delineation shall be completed by a Professional
Environmental Consultant defined above.
v. Wetland Setback. An area between the wetland buffer edge and building
setback edge where development and/or construction of any habitable
building or structure is prohibited. Building setback widths are
established pursuant to Article VII of the Zoning Ordinance. Wetland
setback widths are established pursuant to Article VII, Section b.(i.) of this
ordinance. Structures applicable to state and federal permits (i.e. docks,
piers, seawalls, bulkheads,) may be exempt from the setback regulations
of Articles VI and VII.
w. Upland. An area of land that does not qualify as a wetland because the
associated hydrologic regime is not sufficiently wet to elicit the
development of vegetation, soils, and/or hydrologic characteristics
associated with wetlands. Thus, an upland is a non-protected area
beyond the wetland buffer area.
x. Zoning Administrator. Refers to the acting Zoning Administrator for
Georgetown County, and/or his/her designee(s), including but not limited
to, the Building Official, Code Enforcer, Senior Planner, or the Director of
Planning and Code Enforcement.
V. ADMINISTRATION
a. The provisions of this Ordinance shall be administered and enforced by
the Georgetown County Zoning Administrator, or designee(s).
b. The Zoning Administrator shall institute, or cause to be instituted, such
actions necessary to ensure compliance with these provisions, and/or the
conditions placed upon any permit or other approval.
c. The Zoning Administrator shall have the authority to issue violations
and/or fees for a violation of this Ordinance. The correction of a violation
or action to its original function shall be at no cost to the County and shall
be assessed to the violator.
Page 171 of 253
d. The Zoning Administrator has the authority to issue, deny, or
conditionally approve wetland buffer compliance consistent with the
standards, goals, and criteria set forth in this Ordinance, and which are
subject to the procedures outlined herein.
VI. TYPES OF WETLAND DELINEATIONS
For all proposed land disturbances (defined in Article V.(g.)) taking place within the
unincorporated areas of Georgetown County, and all applicable activities, as
enumerated in Section VIII of this Ordinance, the following shall apply:
a. Where current wetland delineations have already been approved by the
Army Corps of Engineers (USACE), such delineations will constitute
“wetlands” for the purposes of this Ordinance. This Ordinance
encompasses all delineated wetlands regardless of whether they are
jurisdictional or non-jurisdictional.
b. In all other cases, a landowner or authorized agent of the landowner shall
submit to the Zoning Administrator either:
i. an affidavit attesting that no wetlands or wetland buffer areas
exist on the site; or
ii. A Delineation Concurrence (DC) or Preliminary Jurisdictional
Determination (PJD), as defined by the Corps of Engineers, to be
completed by a professional environmental consultant, at the
expense of the property owner or developer.
iii. A wetland delineation prepared and certified by a professional
environmental consultant, a set of drawings sealed by a SC
Registered Land Surveyor, or shown on the National Wetlands
Inventory Map. Professional exhibits shall be dated within twelve
(12) months of the date of the wetland application.
VII. WETLAND BUFFER AREAS AND SETBACKS
a. Wetland Buffer Areas. Wetland buffers are to be calculated by measuring
horizontally outward from and perpendicular to the edge of the
wetland, as defined herein. They must extend the entire length of the
wetland delineation within the property. If a wetland falls into more
than one of the categories below, the more restrictive buffer width shall
control. The following wetland buffer widths apply to all uses and
activities subject to the purview of this Ordinance:
i. General Wetland Buffers. A minimum buffer of thirty-five (35) feet
must be observed for all wetlands and/or open waters as defined
by this Ordinance.
Page 172 of 253
ii. State or National Park, Forest, Refuge, Preserve, or Wildlife
Management Area Wetland Buffers. A buffer of one-hundred
(100) feet must be observed when a wetland is part of, or
adjacent to, any state or nationally protected conservation lands
and/or water bodies. If the continuation of a wetland is on
private property, only the general wetland buffer shall apply.
iii. Riparian and/or Riparian Wetland Buffers. A buffer of fifty (50)
feet must be observed when a property is directly adjacent to a
body of water or a wetland is adjacent to a river or a tributary of a
river. See Article XII.(b.(xxi)) for riparian exemptions.
iv. Industrial Buffers. To counteract the increased risk of pollution
from industrial activities, a buffer of fifty (50) feet must be
observed between wetlands and industrial activities or uses. See
Article XII.(b.(ix)) for industrial and economic development
exemptions.
v. Golf Course Buffers. To counteract the increased risk of
contaminants from golf course maintenance activities, a buffer of
thirty-five (35) feet must be observed between wetlands and golf
courses. However, trees that obstruct play may be removed
pursuant to the Georgetown County Tree Ordinance (Article XIII,
Section 1304.4).
vi. Beachfront. For properties located beachfront, with no wetlands
present, only the State’s Beach/Dune System Critical Area setback
line, and/or setbacks provided in Article VII of the Zoning
Ordinance shall be met. The greater of these restrictions shall
apply.
vii. Incentives and Waivers. A property owner may be granted
additional units as an incentive to increase the wetlands buffer or
waivers to the wetlands buffer requirements based on criteria
established in Article XIII, Sections e and f of this Ordinance.
b. Wetland Setbacks.
i. A minimum setback line of fifteen (15) feet must be observed
around all wetland buffer areas. Wetland setbacks for all buildings
and structures shall be applied in accordance with Article VII
(Area, Yard, and Height Requirements) of the zoning ordinance.
The greater of these two setback restrictions shall apply.
Page 173 of 253
ii. Wetland setbacks are to be calculated by measuring horizontally
outward from and perpendicular to the edge of the wetland
buffer area (see details in Appendix A). They must extend the
entire length of the wetland buffer within the property.
VIII. APPLICABILITY
a. Any person proposing to develop in or near a wetland under this
subsection shall, prior to the commencement of the activity, submit a
Wetland Application to the Zoning Administrator.
b. Applicable Activities. This Ordinance shall apply to any proposed land
disturbance use or activity within a wetland or wetland buffer area,
unless otherwise exempt in Article XI. A Wetland Application should be
submitted simultaneously with the following:
i. Building permit applications for new multi-family and/or
commercial uses;
ii. Development plans and final plat approvals for major and minor
subdivisions;
iii. Rezoning to any PD or FDD zoning district;
iv. Applications for Development Permits;
v. Applications for Stormwater permits, Land Disturbance Permits
(LDP), Stormwater Concept Plan approvals, or Stormwater
Management and Sediment Control Plan approvals, pursuant to
Georgetown County Code; or
vi. Other land uses requiring a permit or approval as required by
Georgetown County.
c. No building permit for new construction and/or development on newly
created lots shall be issued until the required Wetland Application has
been submitted and approved, and no Certificate of Occupancy shall be
issued until the project site is inspected by the Zoning Administrator or
designee for wetland buffer compliance.
d. Non-conforming Lots. All developed lots and all undeveloped but
recorded existing lots of record pursuant to [effective date], which do not
comply with the buffer and setback requirements of this Ordinance shall
be “grandfathered” as legal non-conforming lots. Legal non-conforming
lots shall be inclusive of Force Majeure and other “acts of God.”
Grandfathered lots are not exempt from substantial damage or
Page 174 of 253
substantial improvement as defined in the Flood Damage Prevention
Ordinance (Article 2 (A.), #’s 49 & 50).
e. Permits issued by state or federal agencies do not relieve a person of the
requirement to seek approval under this Ordinance. A wetland
application must still be completed and submitted, along with the state
or federal permit, to the Zoning Administrator.
f. Exemptions. Wetlands that are ½ acre (21,780 sq. ft.) or less in size per
wetland are exempt from these buffer requirements. Wetlands that are
¼ acre (10,890) or less per wetland are exempt from fill restrictions.
These exemptions do not extend to wetlands that cross property lines
and/or are part of a larger wetland system.
IX. PROCEDURES
a. Generally.
i. Wetland Application. A wetland application shall be made readily
available to the public.
ii. Filing Fees. Application filing fees as determined by County
Council shall be made comparable to other Georgetown County
permit application fees. The applicant must pay this non-
refundable fee at the time of filing the Wetland Application.
b. Initiation; Wetland Application.
i. Any person wishing to undertake an “applicable activity” as
defined in Section VIII.(b.), or otherwise disturb a wetland shall
submit a Wetland Application to the Zoning Administrator or
designee. Applicants for sites that do not contain wetlands will
only be required to certify such in writing.
ii. The contents of the Wetland Application shall include the
following:
1. Full name, mailing address, telephone number(s), e-mail
address of the owner and applicant (if different), and
signature;
2. Whether the applicant is the owner, lessee, licensee, etc.
of the subject property (if the applicant is not the owner of
record, written consent of the owner or his/her legal
designee must be attached);
3. Physical address, TMS number, and existing and proposed
use of the property in question;
Page 175 of 253
4. Zoning classification and deeds and covenants waiver for
any deed restrictions relating to the property, when
applicable;
5. A survey containing the following information:
a. the lot size of the entire property;
b. the legal boundaries of the property;
c. the legal ownership of adjacent properties;
d. the proposed project area;
e. wetlands, both jurisdictional & non-jurisdictional (if
applicable);
f. required wetland buffers and setbacks;
g. flood zones (if applicable);
h. any surface water bodies located on or within 100
feet of the legal boundaries of the property; and
i. a proposed area(s) for fill.
6. Photographs of the proposed project site showing the
existing condition of the site;
7. Purpose and detailed description of the project, including
the type of proposed activity, project scale, impacts of
land disturbance, direct and indirect impacts to the
wetlands, and distance from any road or water body.
iii. The Zoning Administrator shall review all materials submitted by
an applicant and shall have the authority to require additional
information about the project from the applicant, schedule a site
visit, or require a preliminary meeting with the applicant.
iv. Public Review and Notice – In cases where appeals are made
pursuant to Article XIII (Appeals) of this ordinance, the public
review and notice procedure outlined in Article XVI of the Zoning
Ordinance (Zoning Board of Appeals) shall apply. The Zoning
Administrator shall make available on the County website, or
upon request, any Wetland Applications for public review and
inspection once the application is deemed complete. Notices
shall not be required for previously approved mitigation or fill
projects of jurisdictional wetlands.
v. Amendment or Withdrawal. An applicant may amend or withdraw
a Wetland Application at any time before a final determination is
made.
vi. Final Determination. The Zoning Administrator must issue a final
determination on any Wetland Application stating the reason(s)
why the application was approved, conditionally approved, or
Page 176 of 253
denied. This determination will be provided at the time of
approval of the building permit or other development review
procedures.
vii. Scope of Approval. The Wetland Application shall be deemed a
part of the underlying application for development approval and a
condition of any permit or development decision.
viii. Submittal Procedures. The Wetland Application shall be submitted
with the underlying application for development approval.
X. STANDARDS AND CRITERIA FOR APPROVAL OR DISAPPROVAL OF WETLAND
APPLICATION (for wetland fill or mitigation projects only)
a. In addition to consideration of the materials submitted by the applicant,
the Zoning Administrator shall require the applicant to demonstrate
evidence of such, including, but not limited to, the following:
i. The functions and values of the wetlands in question;
ii. The proximity of the wetland to other waterbodies;
iii. The environmental impact of the proposed disturbance;
iv. Alternatives to the proposed disturbance and suitability of the
area;
v. Threats to other properties from increases in flooding,
erosion, and/or pollution;
vi. The loss of wetland habitat and the loss of flora/fauna;
vii. The projected cumulative impact of the above factors in
relation to all known previous, pending, and reasonably
anticipated future wetland disturbances. Cumulative shall
include the continuation of wetlands that cross adjacent or
neighboring property lines;
viii. The loss or degradation of wetlands that provide significant
cultural, historic, or natural heritage value, including wetlands
that support or have historically supported community-based
economic uses such as fishing, shell-fishing, crabbing, hunting,
forestry, agriculture, water supply, or other significant
livelihoods.
Page 177 of 253
ix. Whether the purpose of the completed proposed project
serves an overriding public interest, as defined herein; and
x. Whether the activity is water dependent.
b. The Zoning Administrator may also consider other relevant factors, such
as:
i. Input from members of the public, if applicable; and
ii. Input from federal, state, or local agencies, if applicable.
c. The Zoning Administrator shall not approve any application unless a
professional environmental consultant can show, as part of the Wetland
Application, that the proposed disturbance:
i. Does not have any feasible alternatives available that would
reduce adverse impacts on wetlands;
ii. Aligns with an overriding public interest and serves a
legitimate public need;
iii. Does not permanently alter the aquatic ecosystem such that
the wetland function and values are eliminated or impaired;
and
iv. Does not violate other applicable federal, state, or local laws.
d. Conditional Approval. The Zoning Administrator, and/or designee, has
the authority to require certain prerequisites, plan modifications from a
professional environmental consultant as a condition to application
approval, and shall have the authority to fix a reasonable time within
which any conditions must be completed. These conditions can include,
but are not limited to:
i. Design modifications to reduce project impacts to wetlands
and adjacent areas;
ii. Flood and erosion loss reduction measures to prevent hazard
losses; and/or
iii. Deed restrictions, covenants, or conservation easements
regarding future use of lands, including but not limited to
preservation of undeveloped areas. This shall include
disclosures and warnings for future property owners regarding
wetland areas and all regulatory requirements enforced by the
County.
Page 178 of 253
XI. ACTIVITIES PROHIBITED/EXEMPTED
a. Prohibited Activities. Unless exempted below, wetland buffer area
disturbances shall be prohibited unless the proper authorization has been
given to an Applicant by the Zoning Administrator through the Wetland
Application procedures outlined in Article IX above.
b. Exempted Activities. The following activities are exempted from the
purview of this Ordinance and may be undertaken without a Wetlands
Application, where otherwise allowable by law.
i. Any pre-approved mitigation, fill, or construction permits from
the U.S. Army Corps of Engineers (USACE) and/or SCDES-BCM,
pursuant to the effective date of this ordinance. This includes any
development projects that are currently under review by said
agencies;
ii. Installation of nature trails or pervious pedestrian access paths no
greater than four (4) feet in width;
iii. Pruning or trimming of grasses, shrubs, and other smaller
vegetation;
iv. Timber harvesting or other forestry activities, including controlled
burns;
v. Planting native species of plants;
vi. Removal of invasive species of plants;
vii. Any outdoor recreation activities not otherwise proscribed by the
property owner or another applicable law or regulation, to
include hiking, swimming, kayaking, canoeing, boating, horseback
riding, hunting, fishing, shell fishing, and/or camping;
viii. Research of soil, vegetation, water, fish, or wildlife for
educational, scientific, or conservation purposes;
ix. Because of their economic benefits and larger land area
requirements, permitted uses in industrial sites with state or
locally established Economic Development incentives are exempt
from non-jurisdictional wetland requirements. This includes real
property zoned HI and LI that are designated by the county as
“industrial parks.” Such sites must still obtain a Coastal Zone
Consistency (CZC) certification from the Bureau of Coastal
Page 179 of 253
Management, and Article VII buffer and setback standards for
jurisdictional wetlands shall remain in effect;
x. Maintenance or repair of existing water-control devices or
structures, provided the device or structure is not “degraded” as
defined herein, and the maintenance or repair does not involve
enlarging, expanding, constructing, or relocating such water-
control structures or devices;
xi. Maintenance and repair of existing public utilities, critical
infrastructure, and/or roadways (Federal, State, & County).
Maintenance and repair not necessary for the safety or proper
operation of the utility or infrastructure shall not be subject to
this exemption. Existing private utilities and roadways may also
be exempt provided the activity does not involve enlarging,
expanding, constructing, or relocating such utilities and roadways;
xii. Construction of new public utilities, critical infrastructure, and/or
roadways (Federal, State, & County) exercised by the Public
Purpose Doctrine for the State of South Carolina that promotes
public health, safety, and the general welfare of its citizens. This
exemption includes, but is not limited to;
1. Critical electrical infrastructure, including substations,
transformers, junctions, and/or lines;
2. Critical public water and sewer infrastructure, including
wells, pump stations, and/or lines; and,
3. Critical transportation infrastructure, including roads and
bridges.
xiii. Maintenance of the wetlands through prescribed fire applications
conducted by a certified burn manager or the National Forest
Service;
xiv. Piers, docks (raised and floating), decks, gangways, boardwalks,
sea walls, bulkheads, and other like-kind structures that are pre-
approved by USACE or SCDES-BCM;
xv. Construction activities on all developed lots and all undeveloped
but recorded existing lots of record as outlined in Section VIII (d.);
xvi. Family Subdivisions as defined in Article VI, Section 2 of the Land
Development Regulations and heirs property as defined in Article
III, Section 350 of the Zoning Ordinance;
Page 180 of 253
xvii. Parcel splits of one (1) lot into two (2) lots;
xviii. Parcel merges of two (2) existing lots into one (1) lot.
xix. Construction of required stormwater facilities and easements in
the wetland buffer areas; and/or
xx. Construction of pools, only within the wetland setbacks, not the
wetland buffer areas.
xxi. Canal lots located on Sandy Island may be granted a variance (Art.
XIII Appeals) from these wetland buffer areas from the Zoning
Board of Appeals (ZBA), as long as they meet the lot and deed
restriction for this area known as "Paradise Point".
xxii. Any development projects that are currently under review and/or
have submitted an application to the USACE or SCDES-BCM,
pursuant to the effective date of this ordinance.
c. Prior nonconforming use, activity, or structure.
i. Prior nonconforming uses, activities, or structures, as defined
herein, shall not be enlarged or expanded to further encroach
onto or otherwise disturb wetlands, wetland waterbodies, or
wetland watercourses without an approved Wetland Application.
ii. Degraded, dilapidated, or prior nonconforming structures, as
defined herein, shall not be rebuilt without an approved Wetland
Application.
XII. OTHER REQUIREMENTS.
a. Notification of Start of Project. Prior to the start of any project, the
holder of a wetland permit issued pursuant to this Ordinance should
notify the Zoning Administrator in concurrence with the Stormwater Pre-
Construction meeting that the stated project is going to begin.
b. Temporary Survey Stakes and Silt Fencing. As a prerequisite to
development, temporary survey stakes, flags, and/or double-silt fencing
delineating boundaries between wetlands, buffer areas, setbacks, and
adjacent property must be placed at all project sites by an engineer,
surveyor, or contractor to coincide with the regulations of the
Stormwater Ordinance. The markers shall follow the contour of the
wetlands and buffer areas. Stakes and flags shall be placed not more than
fifty (50) feet apart.
Page 181 of 253
c. Inspections. Every Wetland Permit issued pursuant to this Ordinance shall
grant the Zoning Administrator, or designee, the right to inspect a project
to determine compliance with conditions and provisions of this
Ordinance or to perform any duty imposed upon him/her by this
Ordinance.
d. Duration of Wetland Permits. Wetland Applications shall become
Wetland Permits upon inspection and final approval, and shall be valid
concurrent with the underlying permit(s).
e. Incentives. If a property owner or developer elects to provide a buffer
greater than or equal to 150% of the requirements of this Ordinance, a
net density bonus of two (2) additional units per acre may be granted
beyond what is allowed by the applicable zoning district. In addition, the
proposed lot area minimum and yard (setback) requirements from Article
VII may be reduced by 20%. This waiver shall not apply to the 90 foot
front yard setback on Highway 17 found in Section 409 of the Zoning
Ordinance. Density bonuses granted due to increased wetlands buffers
may be in addition to bonuses granted for affordable housing as provided
for in the General Residential section of the Zoning Ordinance and the
Land Use Element of the Comprehensive Plan.
f. Waivers. The Zoning Administrator is authorized to grant a waiver of up
to 20% for any yard (setback) requirement from Article VII in order to
facilitate the wetlands buffer and setback requirements of this ordinance.
This waiver shall only apply to a yard setback that is not adjacent to a
wetland. Further, any development that provides at least 50% of its units
as affordable or workforce housing as defined in the Land Use Element of
the Comprehensive Plan may be eligible for a 50% reduction in the
wetlands buffer requirements of this Ordinance.
g. Other Buffers. All other buffer requirements pursuant to Article XII of
Zoning Ordinance shall apply.
h. Restoration. In the event of a violation, the Zoning Administrator may
have the authority to order the restoration or reclamation of a wetland
area based on the recommendation of a 3 rd party professional
environmental consultant. Fees associated with hiring a professional
environmental consultant and the restoration or reclamation project
shall be on the violator.
XIII. APPEALS
Any affected person or alleged violator of this ordinance may apply for a variance, or
appeal a decision of the Zoning Administrator pursuant to this Ordinance to
Page 182 of 253
Georgetown County Zoning Board of Appeals (ZBA), pursuant to Article XVI of the
Georgetown County Zoning Ordinance.
a. In addition to consideration of the materials submitted by the applicant
and their professional environmental consultant, the Board of Zoning
Appeals should consider other relevant factors, and shall require the
applicant to demonstrate evidence of such, including, but not limited to,
the following:
i. The functions and values of the wetlands in question;
ii. The proximity of the wetland to other waterbodies;
iii. Alternatives to the proposed disturbance and suitability of
the area;
iv. Threats to other properties from increases in flooding,
erosion, and/or pollution;
v. The loss of wetland habitat and the loss of flora/fauna;
vi. The projected cumulative impact of the above factors in
relation to all known previous, pending, and reasonably
anticipated future wetland disturbances;
vii. Whether the purpose of the completed proposed project
serves an overriding public interest, as defined herein;
viii. Whether the activity is water dependent;
ix. Input from members of the public, if applicable; and
x. Input from federal, state, or local agencies, if applicable.
XIV. ENFORCEMENT PROVISION
a. Georgetown County Court of Common Pleas has the jurisdiction to
restrain a violation of this Ordinance at the suit of the County or any
person adversely affected. The County shall not be held liable for any
claims, damages, or enforcement actions arising from such citizen-
initiated proceedings. The County shall not be a party to any legal actions
or claims brought by affected persons under this provision.
NOW THEREFORE, BE IT FURTHER ORDAINED BY THE COUNTY
COUNCIL OF GEORGETOWN COUNTY, SOUTH CAROLINA, IN COUNTY
COUNCIL DULY ASSEMBLED, THAT APPENDIX D WETLAND BUFFERS
Page 183 of 253
AND SETBACKS BE ADDED TO THE APPENDIX SECTION OF THE
GEORGETOWN COUNTY ZONING ORDINANCE AS FOLLOWS:
APPENDIX D
WETLAND BUFFERS AND SETBACKS
Page 184 of 253
This Ordinance, No. ____________ shall be approved, final, and adopted upon third
reading, and shall take force and become effective upon passage.
DONE, RATIFIED AND ADOPTED IN OPEN SESSION THIS __________ DAY
OF ____________________, 2026
___________________________________ (SEAL)
Clint A. Elliott
Chairman, Georgetown County Council
ATTEST:
___________________
Alma D. Sierra
Clerk to Council
This Ordinance, No. ___________ has been reviewed by me and is hereby approved as to
form and legality.
_____________________________________
John Watson
Georgetown County Attorney
First Reading: _______________________________
Second Reading: _____________________________
Third Reading: _______________________________
Page 185 of 253
1
GEORGETOWN COUNTY, SOUTH CAROLINA
WETLAND PROTECTION ORDINANCE
(Complete Redlined Draft 7 for Council Meeting on 5/12/26)
I. TITLE & EFFECTIVE DATE
a. Title. This Ordinance is hereby officially known and cited as the Wetland
Protection Ordinance of Georgetown County, South Carolina. References herein
to “the Ordinance” or “this Ordinance” shall be interpreted as references to this
Wetland Protection Ordinance.
b. Effective Date. This Ordinance shall take effect and be in force from and after the
date of its adoption by the County Council of Georgetown County, adopted this __
day of ___________, 20256.
II. AUTHORITY; CONFLICT; ABROGATION; SEVERANCE
a. Authority. This Ordinance is enacted pursuant to the authority conferred upon
Georgetown County by the South Carolina General Assembly to adopt regulations
designed to promote the public health, safety, and general welfare of its citizenry.
b. Conflict of Laws. This Ordinance shall be construed so as to not conflict with any
provision of state or federal law. However, the provisions of this Ordinance shall
control if more restrictive than other local, state, or federal laws or regulations.
c. Abrogation. This Ordinance is not intended to repeal, abrogate, annul, impair, or
interfere with any existing easements, covenants, deed restrictions, ordinances,
rules, regulations, or permits previously adopted or issued pursuant to law.
d. Severance. If any portion of this Ordinance is held legally invalid by a court of
competent jurisdiction, all remaining provisions shall continue to be of full force
and effect.
III. FINDINGS
a. Georgetown County’s Wetland Resources. The County of Georgetown is home to
five (5) rivers and two (2) major estuaries that are surrounded and supported by
a vast network of fresh and saltwater wetlands. There are 249,336 acres of
wetlands in Georgetown County, 48% of the land area, and over half of those are
considered forested/shrub wetlands, followed by freshwater emergent wetlands
(13%), and estuarine and marine wetlands (12%).
b. Benefits of Wetlands. Healthy wetlands are vitally important, biologically diverse
ecosystems that regulate water quality and quantity. Wetland functions support
ecological and economic health and contribute to the public health, safety, and
Page 186 of 253
2
welfare of the Georgetown community. These unique areas are not only essential
to the overall health of the environment, but also have the capacity to address
local water-related problems that effect Georgetown County. Benefits of wetlands
include the following functions and values:
i. Flood control and mitigation. Wetlands serve the vital ecological function
of flood control and water retention during flood and rain events through
hydrologic absorption and stormwater flow regulation. Their topography
and location allow them to capture, store, and slowly release water,
providing protection for people, property, and infrastructure. Natural
wetlands are more cost-effective and efficient at addressing flooding
concerns than engineered stormwater infrastructure.
ii. Storm protection and erosion control. Wetlands provide natural
protection from hurricanes, storm events, and erosion. Their vegetation
and spongy soils stabilize waterways by reducing water velocity,
preventing stream scour and bank cutting erosion. Deeply-rooted wetland
vegetation stabilizes soils and protects shorelines from erosive forces such
as wind and water. Through their erosion control function, wetlands also
help to conserve soil and water for farms and forests.
iii. Water quality. Water quality is a County-wide environmental issue. The
wetlands and coastal marshes serve two very important mitigation
functions for the region. The Carolina wetland regions have an ability to
act like large natural sponges, absorbing and holding water, and then
slowly releasing it through the canals and tributaries. As waters slowly
flow downstream, wetlands help trap and filter out sediments in the water,
improving nearby water quality. Detailed information on the coastal
wetlands of the Waccamaw region can be found in the 208 Water Quality
Management Plan.
iv. Pollution control and filtration. Wetlands naturally remove harmful
nutrients and pollutants from the environment through biological
degradation and chemical oxidation. The natural friction wetlands create
slows down water flows, allowing suspended sediments to settle.
Nutrients from sources like fertilizers, leaking septic systems, sewage, and
manure, can then be removed from the environment through vegetation
uptake or microorganism absorption. Wetlands are also effective at
removing heavy metals (e.g. lead-Pb) from runoff.
v. Habitat. Wetlands are some of the most biologically diverse ecosystems in
the world, comparable to tropical rainforests and coral reefs in their
species diversity. Wetlands provide spawning, nesting, breeding, feeding,
and migration habitat for a wide variety of plants, birds, mammals,
Page 187 of 253
3
amphibians, reptiles, crustaceans, insects, and microorganisms, including
rare, endangered, and threatened species. Coastal wetlands indirectly
support the fishing industry by providing habitat and nursery grounds for
economically valuable aquatic species like fish, shrimp, and crabs.
vi. Recreation, tourism, and aesthetics. Wetlands provide unique spaces for a
variety of recreational activities, including hiking, boating, fishing, hunting,
birdwatching, wildlife viewing, and photography.
vii. Groundwater. Groundwater-connected wetlands receive and recharge
groundwater, contributing to healthy aquifers and maintaining drinking
water supplies for communities. A healthy range of wetlands supports
overall watershed health.
viii. Education and scientific research. Wetlands are naturally occurring
classrooms and laboratories, providing excellent opportunities for
education and scientific research on a wide range of topics, including soil
types, water quality, and unique species of plants and animals.
ix. Carbon sequestration. Wetlands are heavily vegetated with plants that
remove carbon dioxide from the air. Unlike other ecosystems, the
characteristic wet conditions of wetlands prevent rapid decomposition of
organic matter, allowing carbon to be stored long-term in the soil. In this
way, wetlands help offset human carbon emissions that are harmful to the
global climate.
c. Importance of Wetland Buffers. Wetland buffers, also known as vegetated or
riparian buffers, provide a transition between uplands and wetlands and are
essential to preserving the health of wetlands and waterways. In addition to
supplementing and enhancing the benefits of wetlands listed above, wetland
buffers serve the additional purpose of facilitating wildlife movement to other
habitats (“wildlife corridors”)
The S.C. Office of Resilience (SCOR) and the Office of Ocean and Coastal Resource
Management (OCRM) Bureau of Coastal Management (BCM) within the S.C.
Department of Health and Environmental Control Services (SCDES) protects and
enhances the state’s coastal resources by preserving sensitive and fragile areas
while promoting responsible development encourages the development and
implementation of local ordinances in support of wetland buffers within the eight
(8) coastal counties, including Georgetown.
d. Loss of Wetlands. Historic wetland loss and degradation has directly contributed
to Georgetown County’s flooding and water quality problems. The continued loss
of this natural resource due to development has had and will continue to have
Page 188 of 253
4
detrimental, irreversible, long-term implications not only for the natural
environment, but for the current and future residents of the County. Further Loss
of wetlands and uplands adjacent to wetlands is contrary to the public health,
safety, and welfare of Georgetown County and its residents. Loss of wetland areas
through the practice of filling in wetlands and building on them has both direct
and indirect consequences, including the following:
i. Increased flooding. Filling wetlands dramatically reduces the natural water
absorption capacity of the land. Excess rainwater during flood and rain
events that would otherwise be absorbed or distributed under normal
conditions results in runoff and flooding, putting people and structures
directly at risk.
ii. Decreased water quality. Wetland loss decreases the ability of the land to
naturally remove pollutants from the environment. Without absorption
and vegetative uptake, pollutants are carried downstream in high
concentrations during rain and flood events.
iii. Increased erosion. As runoff and flooding increase, so does the velocity of
water flow. Fast-moving water has the power to change the entire
landscape of an area. In addition to scouring, deepening, and re-routing of
waterways, erosion can also threatens the structural integrity of existing
homes, roads, and other infrastructure.
e. Wetland Fluctuations. Wetlands are fluid, living ecosystems that experience
changes depending on the season or the year. They may be more difficult to
identify during dry periods, giving a false sense of security that they are suitable
for development.
f. Existing Regulations. Unmitigated wetland loss and degradation is are often a
function of unregulated human activity. Existing local, state, and federal
regulations do not fully contemplate or encompass all wetlands within
Georgetown County. In particular, the U.S. Environmental Protection Agency
(EPA) and the U.S. Army Corps of Engineers’ (USACE) authority over wetlands is
constrained by the Clean Water Act’s definition of “waters of the United States,”
and is constantly changing and reforming through decades of administration
changes, litigation, and case law. These shifts do not always provide the clarity
and uniformity necessary to adequately protect and maintain healthy wetland
systems that are necessary for the safety and welfare of Georgetown County’s
residents, as well as for the maintenance of healthy wildlife populations. South
Carolina’s authority over wetlands is only through its indirect authority in
providing certifications that certain projects are consistent with the state’s Coastal
Management Programs; however, this authority fails to capture projects that
would degrade or destroy wetlands. In addition, Georgetown County does not
Page 189 of 253
5
presently have any protections for freshwater or isolated non-jurisdictional
wetlands. Because of the inconsistencies and deficiencies with the state and
federal regulations do not capture and therefore protect all the valuable resources
in Georgetown County, greater legal environmental protection at the County level
is needed to protect and preserve these vital ecosystems.
g. Purpose. These standards are intended to regulate development and activities in
and around wetlands so as to:
1. Avoid the disturbance or alteration of wetlands wherever practicable;
2. Minimize any unavoidable alteration of wetlands;
3. Mitigate any loss of wetlands or wetland integrity by the revegetation or
restoration of altered wetlands, creation of new wetlands, and conservation of
existing wetlands;
4. Minimize erosion, sedimentation, and pollution of wetlands;
5. Limit the placement of fill-in and excavation of wetlands; and
6. Provide buffers along the perimeter of wetlands that will protect the wetlands
from impacts of adjacent development, allow for filtration of stormwater runoff
before it enters wetlands, and allow for scenic wetland views.
IV. PURPOSE
The County of Georgetown hereby finds and declares that the public interest and general
welfare of the residents of the County will be served through the creation of procedures
for the protection, conservation, enhancement, and proper maintenance of all existing
wetlands and wetland buffer areas within the County and for the protection of existing
wetlands and wetland buffer areas from encroachment, pollution, degradation,
alteration, or elimination. These protections are an integral part of the County’s broader
surface and groundwater management plans. These protections are also a crucial
element of the County’s resiliency plan in anticipation of more frequent and severe storm
events as well as documented and projected sea level rise (SLR). These standards are
intended to regulate development and activities in and around wetlands so as to:
1. Avoid the disturbance or alteration of wetlands wherever practicable;
2. Minimize any unavoidable alteration of wetlands;
3. Mitigate any loss of wetlands or wetland integrity by the revegetation or restoration
of altered wetlands, creation of new wetlands, and conservation of existing wetlands;
4. Minimize erosion, sedimentation, and pollution of wetlands;
5. Limit the placement of fill-in and excavation of wetlands; and
6. Provide buffers along the perimeter of wetlands that will protect the wetlands from
impacts of adjacent development, allow for filtration of stormwater runoff before it
enters wetlands, and allow for scenic wetland views.
In light of these stated findings and purposes, and in keeping with the updated
Georgetown County Comprehensive Plan, including the Land Use and Natural Resources
Elements (2024), the County of Georgetown enacts the Wetland Protection Ordinance to
Page 190 of 253
6
incorporate wetland area protections into all of Georgetown County’s land use, planning,
zoning, and development approval procedures.
V. DEFINITIONS
a. Adopted (effective) Date. Date in which this ordinance is adopted by 3 rd reading
of Georgetown County Council.
b. Agricultural Activities. The actions or practices involved in the cultivation of crops,
raising of animals, and the production of food, fiber, and other goods from the
land. This definition includes other terms such as farming, livestock, aquaculture,
agroforestry, horticulture, silviculture, agronomy, and agro-processing.
c. Buffer. An area of non-disturbance between adjacent to a delineated wetland and
a setback where natural vegetation must be maintained in order to protect the
wetland or its functions. Buffer widths are established pursuant to Section VIII of
this Ordinance.
d. Building Setback Line. A line delineating the minimum allowable distance
between the property line and a building on a lot, within which no building or
other structure shall be placed except as otherwise provided.
e. Compensatory Mitigation. Under Section 404 of the Clean Water Act,
compensatory mitigation is an activity that involves the restoration,
establishment, enhancement, or preservation of wetlands. This can be a project,
monetary payment, or other in-kind contributions to conduct offsite actions that
are intended to offset adverse impacts of a development in or near a wetland.
f. Degraded Structure. Any building, wall, road, dock, water control device, or other
structure of any kind that the Zoning Administrator or Building Official determines
to be more than fifty percent (50%) destroyed or damaged.
g. Development. The planning for or carrying out of a building activity, changing of
land characteristics or mining operation, the making of a material change in the
use or appearance of any structure or property, or the dividing of land into three
(3) or more parcels.
h. Dilapidated Structure. Any building that has fallen into disrepair from neglect or
decay, and is otherwise in a state of partial ruin to an extent that the structure is
a hazard to the health, safety, or welfare of the general public.
i. Disturbance. Any human-made land alterations, disturbances, or construction
activities, including, but not limited to, filling; clearing; grading; dredging;
excavating; draining; construction; mining; removal of peat, sand, gravel, or other
sediment; altering the water level or water table; altering surface drainage
Page 191 of 253
7
characteristics, sediment patterns, or flood retention characteristics; installation
of septic tanks; or any other alteration or use of wetland areas.
j. Encroachment. The act of a person advancing development beyond an established
limit, such as a critical line, buffer area, or setback.
k. Feasible Alternative to Wetlands Fill. Applies to location and/or sites of a specific
tract, methods of design or construction, and includes a “no action” alternative.
Feasibility in each case is based on the best available information, including but
not limited to, technical input from a licensed consultant, and consideration of
factors of environmental and economic suitability of the proposed activity and its
alternatives. Based on the analysis of the professional environmental consultant,
and any feasible alternative, such as mitigation methods or Best Management
Practices (BMP) to the acceptance of wetland fill, will be at the discretion of the
Zoning Administrator.
l. Grandfathered. A policy or provision in which an old development regulation
continues to apply to most existing situations while a new regulation will apply to
all future cases of development (also see Article IXVIII, Section d.).
m. Nonconforming. Any use, activity, or structure in operation or existence on the
date of this Ordinance that would otherwise not be permissible according to the
terms herein.
n. Non-conforming Lots. All developed lots and all undeveloped but recorded
existing lots of record zoned for single-family dwellings pursuant to [effective
date], which do not comply with the buffer and/or setback requirements of this
Ordinance shall be “grandfathered” as legal non-conforming lots.
o. Open Waters. Open waters habitat includes main river channels and portions of
lakes and backwaters that remain permanently flooded all year and appear less
than 10% vegetated.
p. Person. Any individual, firm, partnership, association, trust, corporation,
company, organization, or legal entity of any kind, whether public or private,
including municipal corporations, governmental agencies, or subdivisions thereof.
q. Wetlands Professional Environmental Consultant. An environmental consultant,
such as a scientist, surveyor, or engineer who studies, manages, designs, and/or
conserves wetlands by delineating their boundaries, assessing their health, and
developing restoration or mitigation plans to reduce impacts on these wetland
ecosystems.
Page 192 of 253
8
r. Public Interest. As used herein, public interest, also referred to as “overriding
public interest” must be demonstrated by all applicants as a prerequisite to a
wetland mitigation or fill application approval of more than one (1) acre. Public
interest is defined as a purpose that directly benefits the welfare or the well-being
of the community at large as opposed to benefiting a singular person,
organization, or entity. An overriding public interest contemplates the purpose of
the final, completed proposed project and does not include any limited public
benefits that may be derived prior to project completion, such as economic
benefits from providing construction jobs, etc.
s. Setback. An area of between the buffer and the upland where construction of any
building or structure is prohibited. Setback widths are established pursuant to
Section VIII of the Zoning Ordinance.
t. Water Dependent. A use or activity which can be carried out only on, in, or
adjacent to water areas because the use requires access to the water body for
water-borne transportation, recreation, energy production, or source of water.
u. Water Control Devices. Dams, bulkheads, retaining walls, terraces, sluices,
culverts, dikes, berms, levees, ditches, farm pounds, or any other human-made
device or structure designed to regulate the natural flow of water.
v. Wetland(s). Those areas that are inundated or saturated by surface or
groundwater at a frequency and duration sufficient to support, and that under
normal circumstances do support, a prevalence of vegetation typically adapted for
life in saturated soil conditions (as defined by the United States Army Corps of
Engineers and the Environmental Protection Agency).
Wetlands are identified and characterized by three things: (1) predominantly
hydric soils, meaning soils that are formed under wet conditions; (2) species of
plants that tolerate wet conditions (hydrophytes); and (3) the presence of water
above or just below the soil surface for at least a portion of the growing season
each year. Wetlands generally include lands and waters meeting this definition,
and encompass areas referred to as swamps, marshes, tidal flats, bays, bogs,
estuaries, wetland meadows, ephemeral and tributary systems, vernal pools,
banks, reservoirs, ponds, lakes, lands under water bodies, and other similar areas
as determined by SCDES and USACE. Determination of wetland boundaries shall
be performed in accordance addition to with Section VII of this Ordinance.
i. Jurisdictional Wetlands. The U.S. Army Corps of Engineers determines
whether wetlands qualify as “waters of the United States” through the
Corps Wetland Delineation Manual and Southeast Supplement. Federal
case law on what constitutes “waters of the United States” continues to
evolve. For that reason, local governments need consistency in
Page 193 of 253
9
determining what areas are entitled to protection outside of the Corps’
regulatory authority.
ii. Non-jurisdictional (isolated) Wetlands. Wetlands falling outside the
purview of “waters of the United States” are still “wetlands” and provide
the same benefits and environmental services as jurisdictional wetlands.
This Ordinance contemplates protections for both jurisdictional and non-
jurisdictional (isolated) wetlands.
w. Wetland Application. A document prepared by the County and provided to the
owner(s) of the property, or their agent, that acts as a request for a permit to
develop near a wetlands area. Once approved, the wetlands application
becomes the wetlands permit and is then considered legally binding.
x. Wetland Delineation. A report, identifying and evaluating the boundaries,
location, limits, area, and quality of all on-site wetlands, with such delineation
to be conducted in accordance with the “Corps of Engineers Wetlands
Delineation Manual,” technical report: Y-87-1, from 1987. The wetland
delineation shall be completed by a Professional Environmental Consultant
defined above.
y. Wetland Setback. An area between the wetland buffer edge and building setback
edge where development and/or construction of any habitable building or
structure is prohibited. Building setback widths are established pursuant to Article
VII of the Zoning Ordinance. Wetland setback widths are established pursuant to
Article VIII, Section b.(i.) of this ordinance. Structures applicable to state and
federal permits (i.e. docks, piers, seawalls, bulkheads,) may be exempt from the
setback regulations of Articles VII and VIII.
z. Upland. An area of land that does not qualify as a wetland because the associated
hydrologic regime is not sufficiently wet to elicit the development of vegetation,
soils, and/or hydrologic characteristics associated with wetlands. Thus, an upland
is a non-protected area beyond the setback wetland buffer area.
aa. Zoning Administrator. Refers to the acting Zoning Administrator for Georgetown
County, and/or his/her designee(s), including but not limited to, the Building
Official, Code Enforcer, Senior Planner, or the Director of Planning and Code
Enforcement.
VI. ADMINISTRATION
a. The provisions of this Ordinance shall be administered and enforced by the
Georgetown County Zoning Administrator, or designee(s).
Page 194 of 253
10
b. The Zoning Administrator shall institute, or cause to be instituted, such actions
necessary to ensure compliance with these provisions, and/or the conditions
placed upon any permit or other approval.
c. The Zoning Administrator shall have the authority to issue violations and/or fees
for cause whatever actions are necessary at a site or location where a violation of
this Ordinance. has occurred to ensure that it is returned to its original quality and
function, and The same cause correction of a violation or action to its original
function shall be at no cost to the County and shall be assessed to the violator.
d. The Zoning Administrator has the authority to issue, deny, or conditionally
approve wetland buffer Certifications compliance consistent with the standards,
goals, and criteria set forth in this Ordinance, and which are subject to the
procedures outlined herein.
e. Regulation of land uses. The regulation of land uses both within and adjacent to
wetlands, having been determined to be in the best interest of the County, shall
be done in a manner consistent with the review procedures and performance
standards identified herein which reflect the relative importance, values, and
functions of these areas.
VII. TYPES OF WETLAND DELINEATIONS
For all proposed land disturbances (defined in Article V.(ig.)) taking place within the
unincorporated areas of Georgetown County, as defined here in Section V (c) above, and all
applicable activities, as enumerated in Section IXVIII of this Ordinance, the following shall
apply:
a. Where current unexpired wetland delineations have already been approved by
the Army Corps of Engineers (USACE), such delineations will constitute “wetlands”
for the purposes of this Ordinance. This Ordinance encompasses all delineated
wetlands regardless of whether they are jurisdictional or non-jurisdictional.
b. In all other cases, a landowner or authorized agent of the landowner shall submit
to the Zoning Administrator either:
i. an affidavit attesting that no wetlands or wetland buffer areas exist on the
site; or
ii. aA professional wetlands dDelineation Concurrence (DC) or Preliminary
Jurisdictional Determination (PJD), as defined by the Corps of Engineers, to
be completed by a professional environmental consultant, at the expense
of the property owner or developer.
iii. A wetland delineation prepared and certified by a professional
environmental consultant, a set of drawings sealed by a SC Registered Land
Surveyor, or shown on the National Wetlands Inventory Map. Professional
Page 195 of 253
11
exhibits shall be dated within twelve (12) months of the date of the
wetland application.
VIII. WETLAND BUFFER AREAS AND SETBACKS
a. Wetland Buffer Areas. Wetland buffers are to be calculated by measuring
horizontally outward from and perpendicular to the edge of the wetland, as
defined herein. They must extend the entire length of the wetland delineation
within the property. If a wetland falls into more than one of the categories below,
the more restrictive buffer width shall control. The following wetland buffer
widths are applicable apply to all uses and activities subject to the purview of this
Ordinance:
i. General Wetland Buffers. A minimum buffer of seventy-five (75) thirty-five
(35) feet must be observed for all wetlands and/or open waters as defined
by this Ordinance.
ii. Wildlife Refuge, Wildlife Sanctuary, or Nature Preserve Wetland Buffers. A
buffer of two-hundred (200) one-hundred (100) feet must be observed
when a wetland is part of, adjacent to, or within one hundred (100) feet of
a Wildlife Refuge, a Wildlife Sanctuary, or a Nature Preserve.
iii. Local, State or National Park, or Forest, Refuge, Preserve, or Wildlife
Management Area Wetland Buffers. A buffer of one-hundred (100) feet
must be observed when a wetland is part of, or adjacent to, or within one
hundred (100) feet of any local, state, or nationally protected conservation
lands and/or water bodies park. If the continuation of a wetland is on
private property, only the general wetland buffer shall apply.
iv. Riparian and/or Riparian Wetland Buffers. A buffer of one-hundred (100)
fifty (50) feet must be observed when a property is directly adjacent to a
body of water or a wetland is adjacent to a river or a tributary of a river.
See Article XII.(b.(xixxxi)) for riparian exemptions.
v. Industrial Buffers. To counteract the increased risk of pollution from
industrial activities, a buffer of one-hundred (100) fifty (50) feet must be
observed between wetlands and industrial activities or uses. See Article
XII.(b.(ix)) for industrial and economic development exemptions.
vi. Agricultural Buffers. To counteract the increased risk of pollution from
fertilizer, pesticide, and animal waste, a buffer of one hundred (100) feet
must be observed between wetlands and agricultural activities or uses.
vii. Golf Course Buffers. To counteract the increased risk of contaminants from
golf course maintenance activities, a buffer of one hundred (100) thirty-
five (35) feet must be observed between wetlands and golf courses.
Page 196 of 253
12
However, trees that obstruct play may be removed pursuant to the
Georgetown County Tree Ordinance (Article XIII, Section 1304.4).
viii. Beachfront. For properties located beachfront, with no wetlands present,
only the State’s Beach/Dune System Critical Area setback line, and/or
setbacks provided in Article VII of the Zoning Ordinance shall be met. The
greater of these restrictions shall apply.
ix. Incentives and Waivers. A property owner may be granted additional units
as an incentive to increase the wetlands buffer or waivers to the wetlands
buffer requirements based on criteria established in Article XIII, Sections e
and f of this Ordinance.
b. Wetland Setbacks.
i. A minimum setback line of fifteen (15) feet must be observed around all
wetland buffer areas. Wetland setbacks for all buildings and structures
shall be applied in accordance with Article VII (Area, Yard, and Height
Requirements) of the zoning ordinance. The greater of these two setback
restrictions shall apply.
ii. Wetland setbacks are to be calculated by measuring horizontally outward
from and perpendicular to the edge of the wetland buffer area (see details
in Appendix A). They must extend the entire length of the wetland buffer
within the property.
IX. APPLICABILITY
a. Any person proposing to carry out develop in or near a wetland disturbance under
this subsection shall must, prior to the commencement of the activity, submit a
Wetland Impact Application to the Zoning Administrator.
b. Applicable Activities. This Ordinance shall apply to any proposed land disturbance
use or activity within a wetland or wetland buffer area, unless otherwise exempt
in Article XII. A Wetland Impact Application should be submitted simultaneously
with the following:
i. Building permit applications for new multi-family and/or commercial uses
pursuant to Georgetown County Code, Chapter 7;
ii. Land use or zoning applications;
iii. Development plans and final plat approvals for major and minor
subdivisions, pursuant to Georgetown County Code, Appendix B;
Page 197 of 253
13
iv. Plat approvals exempted from the standard development review and
approval procedures, pursuant to Georgetown County Code, Appendix B,
Section 17;
v. Rezoning to any PD or FDD zoning district;
vi. Applications for Development Permits pursuant to Georgetown County
Ordinance No. 19-17;
vii. Occupancy permit applications for mobile or manufactured homes
pursuant to Georgetown County Code, Chapter 7;
viii. Requests for permission to fill in ditches along county roads and rights-of-
way pursuant to Georgetown County Code, Chapter 7, Section 16;
ix. Applications for waste disposal permits pursuant to Georgetown County
Code, Chapter 7, Article III;
x. Applications for Stormwater permits, Land Disturbance Permits (LDP),
Stormwater Concept Plan approvals, or Stormwater Management and
Sediment Control Plan approvals, pursuant to Georgetown County Code
Appendix C; or
xi. Any Other land uses requiring a permit or approval as required by and
within the Georgetown County Code.
c. No building permit for new construction and/or development on newly created
lots shall be issued until the required Wetland Impact Application has been
submitted and approved, and no Certificate of Occupancy shall be issued until the
project site is certified inspected by an on-site inspection by the Zoning
Administrator or his/her designee for wetland buffer compliance.
d. Non-conforming Lots buffers. All developed lots and all undeveloped but recorded
existing lots of record zoned for single-family house dwellings pursuant to
[effective date], which do not comply with the buffer and setback requirements
of this Ordinance shall be “grandfathered” as legal non-conforming lots, except
that existing landscaping on these legal non-conforming lots which satisfies, either
partially or wholly, the buffer requirements of this Ordinance, shall be required to
be maintained. Legal non-conforming lots shall be inclusive of Force Majeure and
other “acts of God.” Grandfathered lots are not exempt from substantial damage
or substantial improvement as defined in the Flood Damage Prevention Ordinance
(Article 2 (A.), #’s 49 & 50).
Page 198 of 253
14
e. Permits issued by local, state, or federal agencies do not relieve a person of the
requirement to seek approval under this Ordinance. A wetland application must
still be completed and submitted, along with the state or federal permit, to the
Zoning Administrator.
f. Exemptions. Wetlands that are ¼ acre (10,890 sq. ft.) ½ acre (21,780 sq. ft.) or less
in size per wetland are exempt from these buffer requirements. Wetlands that
are 1/10 acre (4,356 sq. ft.) ¼ acre (10,890) or less per wetland are exempt from
fill restrictions. These exemptions do not extend to wetlands that cross property
lines and/or are part of a larger wetland system.
X. PROCEDURES
a. Generally.
i. Wetland Notification Form and Welands Impact Application. The Planning
Department shall develop aA wetland Notification Form application shall
be made readily available and shall make it easily accessible to the public.
ii. Filing Fees. The Zoning Administrator is authorized to create a filing
Application filing fees as determined by County Council shall be made
regime, and to set reasonable rates comparable to other Georgetown
County permit application fees. The applicant must pay this non-
refundable fee at the time of filing the Wetland Application.
b. Initiation; Wetland Notification Form and Wetlands Impact Application.
i. Any person wishing to undertake an “applicable activity” as defined herein
in Section IXVIII.(b.), or otherwise disturb a wetland shall submit an
Wetland Impact Application to the Zoning Administrator or designee. For
applicants who will adhere to all buffer and setback requirements and will
not impact wetlands, a Wetlands Notification Form may be submitted.
Applicants for sites that do not contain wetlands will only be required to
certify such in writing.
ii. The contents of both the Wetlands Notification Form and Wetland Impact
Application shall include the following:
1. Full name, mailing address, telephone number(s), and e-mail
address of the owner and applicant (if different), and signature;
2. Whether the applicant is the owner, lessee, licensee, etc. of the
subject property (if the applicant is not the owner of record,
written consent of the owner or his/her legal designee must be
attached);
3. Physical address, TMS number, and existing and proposed use /or
geographic coordinates of the property in question;
Page 199 of 253
15
4. Zoning classification and deeds and covenants waiver for any deed
restrictions relating to the property, when applicable;
5. A sketch map survey containing the following information:
a. the lot size of the entire property;
b. the legal boundaries of the property;
c. the legal ownership and lot size of adjacent properties;
d. the proposed project area; and
e. wetlands, both jurisdictional & non-jurisdictional (if
applicable);
f. required wetland buffers and setbacks;
g. flood zones (if applicable);
h. any surface water bodies located on or within 100 feet of
the legal boundaries of the property; and
i. a proposed area(s) for fill.
6. Photographs of the proposed project site showing the existing
condition of the site;
7. Purpose and detailed description of the project, including the type
of proposed activity, project dimensions scale, impacts of land
disturbance, direct and indirect impacts to the wetlands, and
distance from any road or water body.
iii. If the applicable activity will result in impacts to wetlands or buffers and
setbacks, the applicant must submit the following additional materials as
part of the Wetlands Impact Application:
1. Description of anticipated direct and indirect wetland impacts of
the proposed land disturbance;
2. A detailed explanation of why this activity cannot be located at an
upland location, along with descriptions of any alternatives that
were considered;
3. A detailed description of all measures proposed to reduce or
compensate for project impacts; and
4. A statement demonstrating how the purpose of the completed
proposed project serves an overriding public interest, as defined
herein.
iv. The Zoning Administrator shall review all materials submitted by an
applicant and shall have the authority to require additional information
about the project from the applicant, schedule a site visit, or require a
preliminary meeting with the applicant. The Zoning Administrator may
also request a review of the project by the planning commission.
v. Public Review and Notice – In cases where appeals are made pursuant to
Article XIIIV (Appeals) of this ordinance, the public review and notice
procedure outlined in Article XVI of the Zoning Ordinance (Zoning Board of
Page 200 of 253
16
Appeals) shall apply. The Zoning Administrator shall make available on the
County website, or upon request, any Wetland Applications for public
review and inspection once the application is deemed complete. Notices
shall not be required for previously approved mitigation or fill projects of
jurisdictional wetlands.
vi. Upon receipt of the Wetlands Application, supplemental materials where
applicable, and payment of applicable fees, the Zoning Administrator shall
notify the applicant in writing that the application has been deemed
complete.
vii. Public Notice Period. The Zoning Administrator shall post any Wetland
Applications on the County website for public review and inspection once
the application is deemed complete. This information shall remain posted
for a period of fourteen (14) calendar days. During this time frame, the
Office of the Zoning Administrator must accept written public comments
on all Wetland Applications and the Zoning Administrator must consider
those written comments when making a final determination. Such written
comments may be facilitated by mail or electronically, via email or another
comparable internet-based comment mechanism.
viii. Notice to Adjacent Landowners – Once an applicant receives notice from
the Zoning Administrator that all materials have been received, the
applicant must give written notice thereof, by certified mail (return receipt
requested) or hand-delivered, to all adjacent landowners. This notice must
include a copy of the completed Wetland Application or shall state where
copies may be examined or obtained by the public.
ix. Amendment or Withdrawal. An applicant may amend or withdraw a
Wetland Impact Application at any time before a final determination is
made.
x. Final Determination. The Zoning Administrator must issue a written final
determination on any Wetland Impact Application stating the reason(s)
why the application was approved, conditionally approved, or denied, no
later than fourteen (14) calendar days after the public notice period has
closed. This determination will be provided at the time of approval of the
building permit or other development review procedures.
xi. Scope of Approval. The Wetland Impact Application shall be deemed a part
of the underlying application for development approval and a condition of
any permit or land use development decision.
Page 201 of 253
17
xii. Recording Submittal Procedures. The Wetland Impact Application shall be
recorded submitted with the underlying application for development
approval.
XI. STANDARDS AND CRITERIA FOR APPROVAL OR DISAPPROVAL OF WETLAND
APPLICATION (for wetland fill or mitigation projects only)
a. In addition to consideration of the materials submitted by the applicant, the
Zoning Administrator must consider other relevant factors, and shall require the
applicant to demonstrate evidence of such, including, but not limited to, the
following:
i. The functions and values of the wetlands in question;
ii. The proximity of the wetland to other waterbodies;
iii. The environmental impact of the proposed disturbance;
iv. Alternatives to the proposed disturbance and suitability of the area;
v. Threats to other properties from increases in flooding, erosion, and/or
pollution;
vi. The loss of wetland habitat and the loss of flora/fauna;
vii. The projected cumulative impact of the above factors in relation to all
known previous, pending, and reasonably anticipated future wetland
disturbances. Cumulative shall include the continuation of wetlands
that cross adjacent or neighboring property lines;
viii. The loss or degradation of wetlands that provide significant cultural,
historic, or natural heritage value, including wetlands that support or
have historically supported community-based economic uses such as
fishing, shell-fishing, crabbing, hunting, forestry, agriculture, water
supply, or other significant livelihoods.
ix. Whether the purpose of the completed proposed project serves an
overriding public interest, as defined herein; and
x. Whether the activity is water dependent.
xi. Input from members of the public, if applicable; and
xii. Input from federal, state, or local agencies, if applicable.
b. The Zoning Administrator may also consider other relevant factors, such as:
Page 202 of 253
18
i. Input from members of the public, if applicable; and
ii. Input from federal, state, or local agencies, if applicable.
c. The Zoning Administrator shall not approve any application, conditional or
otherwise unless a 3rd party wetlands professional environmental consultant can
show, as part of the Wetland Application, that the proposed disturbance:
i. Does not have any feasible alternatives available that would reduce
adverse impacts on wetlands;
ii. Aligns with an overriding public interest and serves a legitimate public
need;
iii. Does not permanently alter the aquatic ecosystem such that the
wetland function and values are eliminated or impaired; and
iv. Does not violate other applicable federal, state, or local laws.
d. Conditional Approval. The Zoning Administrator, and/or designee, shall have has
the authority to require certain prerequisites, plan modifications, wetland
management plans, and/or compensatory mitigation plans from a professional
environmental consultant as a condition to application approval if it deems such
conditions are necessary to further the purposes of this Ordinance, and shall have
the authority to fix a reasonable time within which any conditions must be
completed. These conditions can include, but are not limited to:
i. Design modifications to reduce project impacts to wetlands and
adjacent areas;
ii. Flood and erosion loss reduction measures to prevent hazard losses;
and/or
iii. Compensatory mitigation measures to offset losses to wetland area
acreage, functions, and values;
iv. Increasing wetland buffer widths to protect sensitive areas;
v. Requiring structures to be elevated on piles, flood-proofed, or
otherwise protected from hazards including flood heights, velocities,
and erosion potential;
vi. Modification of waste disposal and water supply facilities to reflect
flooding, high ground water, and erosion hazards;
Page 203 of 253
19
vii. Inclusion in the deed for the property a warning that the property
contains a wetland area and that any activities in the wetland area are
subject to special regulatory requirements;
viii. Deed restrictions, covenants, or conservation easements regarding
future use of lands, including but not limited to preservation of
undeveloped areas. This shall include disclosures and warnings for
future property owners regarding wetland areas and all regulatory
requirements enforced by the County.; and/or
ix. Erection of permanent wetland area markers or signs.
e. The Zoning Administrator shall not approve any application, conditional or
otherwise, unless if it finds that the proposed disturbance:
i. will not cause a net loss of wetland area functions, values;
ii. will avoid wetland areas to the maximum extent practicable;
iii. will not increase flood, erosion, subsidence, or pollution;
iv. will not adversely modify wildlife habitat or otherwise jeopardize plant,
animal, or other wildlife species;
v. will preserve natural drainage features to the maximum extent
possible and minimize the need to construct, repair, maintain, or
replace structural water management systems;
vi. will not permanently alter the aquatic ecosystem in the vicinity of the
project;
vii. will not threaten public health or safety;
viii. will not harm the public interest;
ix. will not negatively impact recreational opportunities for the pubic,
where applicable;
x. will not impair public rights in public waters;
xi. will not create a nuisance to neighboring property owners or the
community at large; and
xii. will not violate other applicable federal, state, or local laws.
Page 204 of 253
20
XII. ACTIVITIES PROHIBITED/EXEMPTED
a. Prohibited Activities. Unless exempted below, any wetland buffer area
disturbances shall be prohibited unless the proper authorization has been given
to an Applicant by the Zoning Administrator through the Wetland Application
procedures outlined in Article XIX above.
b. Exempted Activities. The following activities are exempted from the purview of
this Ordinance and may be undertaken without a Wetlands Impact Application,
where otherwise allowable by law.
i. Any pre-approved mitigation, fill, or construction permits from the U.S.
Army Corps of Engineers (USACE) and/or SCDES-BCM, pursuant to the
effective date of this ordinance. This includes any development projects
that are currently under review by said agencies;
ii. Installation of nature trails or pervious pedestrian access paths no greater
than four (4) feet in width;
iii. Pruning or trimming of grasses, shrubs, and other smaller vegetation;
iv. Timber harvesting or other forestry activities, including controlled burns;
v. Planting native species of plants;
vi. Removal of invasive species of plants;
vii. Any outdoor recreation activities not otherwise proscribed by the property
owner or another applicable law or regulation, to include hiking,
swimming, kayaking, canoeing, boating, horseback riding, hunting, fishing,
shell fishing, and/or camping;
viii. Research of soil, vegetation, water, fish, or wildlife for educational,
scientific, or conservation purposes;
ix. Because of their economic benefits and larger land area requirements,
permitted uses in industrial sites with state or locally established Economic
Development incentives are exempt from non-jurisdictional wetland
requirements. This includes real property zoned HI and LI that are
designated by the county as “industrial parks.” Such sites must still obtain
a Coastal Zone Consistency (CZC) certification from the Bureau of Coastal
Management, and Article VII buffer and setback standards for
jurisdictional wetlands shall remain in effect;
Page 205 of 253
21
x. Maintenance or repair of existing water-control devices or structures,
provided the device or structure is not “degraded” as defined herein, and
the maintenance or repair does not involve enlarging, expanding,
constructing, or relocating such water-control structures or devices; or
xi. Maintenance and repair of existing public utilities, critical infrastructure,
and/or roadways (Federal, State, & County). Maintenance and repair not
necessary for the safety or proper operation of the utility or infrastructure
shall not be subject to this exemption. Existing private utilities and
roadways may also be exempt provided the activity does not involve
enlarging, expanding, constructing, or relocating such utilities and
roadways;
xii. Construction of new public utilities, critical infrastructure, and/or
roadways (Federal, State, & County) exercised by the Public Purpose
Doctrine for the State of South Carolina that promotes public health,
safety, and the general welfare of its citizens. This exemption includes, but
is not limited to;
1. Critical electrical infrastructure, including substations,
transformers, junctions, and/or lines;
2. Critical public water and sewer infrastructure, including wells,
pump stations, and/or lines; and,
3. Critical transportation infrastructure, including roads and bridges.
xiii. Maintenance of the wetlands through prescribed fire applications
conducted by a certified burn manager or the National Forest Service;
xiv. Piers, docks (raised and floating), decks, gangways, boardwalks, sea walls,
bulkheads, and other like-kind structures that are pre-approved by USACE
or SCDES-BCM;
xv. Construction activities on all developed lots and all undeveloped but
recorded existing lots of record as outlined in Section VIIIX (d.);
xvi. Family Subdivisions as defined in Article VI, Section 2 of the Land
Development Regulations and heirs property as defined in Article III,
Section 350 of the Zoning Ordinance;
xvii. Parcel splits of one (1) lot into two (2) lots;
xviii. Parcel merges of two (2) existing lots into one (1) lot.
xix. Construction of required stormwater facilities and easements in the
wetland buffer areas; and/or
Page 206 of 253
22
xx. Construction of pools, only within the wetland setbacks, not the wetland
buffer areas.
xxi. Canal lots located on Sandy Island may be granted a variance (Art. XIIIV
Appeals) from these wetland buffer areas from the Zoning Board of
Appeals (ZBA), as long as they meet the lot and deed restriction for this
area known as "Paradise Point".
xxii. Any development projects that are currently under review and/or have
submitted an application to the USACE or SCDES-BCM, pursuant to the
effective date of this ordinance.
c. Prior nonconforming use, activity, or structure.
i. Prior nonconforming uses, activities, or structures, as defined herein, shall
not be enlarged or expanded to further encroach onto or otherwise disturb
wetlands, wetland waterbodies, or wetland watercourses without an
approved Wetland Application.
ii. No nonconforming use, activity, or structure which has been discontinued
for two (2) years or more shall be resumed without a permit.
iii. Degraded, dilapidated, or prior nonconforming structures, as defined
herein, shall not be rebuilt without an approved Wetland Application
permit.
XIII. OTHER REQUIREMENTS.
a. Notification of Start of Project. Prior to the start of any project, Tthe holder of a
wetland permit issued pursuant to this Ordinance must should notify the Zoning
Administrator in writing at least five (5) business days prior to the start of a project
in concurrence with the Stormwater Pre-Construction meeting, that the stated
project is going to begin.
b. Temporary Survey Stakes and Silt Fencing. As a prerequisite to development,
Ttemporary survey stakes, or flags, and/or double-silt fencing delineating
boundaries between wetlands, buffer areas, setbacks, and adjacent property must
be placed at all project sites by an engineer, or surveyor, or the contractor to
coincide with the regulations of the Stormwater Ordinance. The markers shall
follow the contour of the wetlands, and buffer areas, and setbacks and. Stakes
and flags shall be placed not more than fifty (50) feet apart.
c. Inspections. Every certification Wetland Permit issued pursuant to this Ordinance
shall grant the Zoning Administrator, or his/her designee, the right to inspect a
Page 207 of 253
23
project to determine compliance with conditions and provisions of this Ordinance
or to perform any duty imposed upon him/her by this Ordinance.
d. Duration of Wetland Certifications Permits. Wetland Certifications Applications
shall become Wetland Permits upon inspection and final approval, and shall be
valid concurrent with the underlying permit(s).
e. Incentives. If a property owner or developer elects to provide a buffer greater
than or equal to 150% of the requirements of this Ordinance, a net density bonus
of two (2) additional units per acre may be granted beyond what is allowed by the
applicable zoning district. In addition, the proposed lot area minimum and yard
(setback) requirements from Article VII may be reduced by 20%. This waiver shall
not apply to the 90 foot front yard setback on Highway 17 found in Section 409 of
the Zoning Ordinance. Density bonuses granted due to increased wetlands buffers
may be in addition to bonuses granted for affordable housing as provided for in
the General Residential section of the Zoning Ordinance and the Land Use Element
of the Comprehensive Plan.
f. Waivers. The Zoning Administrator is authorized to grant a waiver of up to 20%
for any yard (setback) requirement from Article VII in order to facilitate the
wetlands buffer and setback requirements of this ordinance. This waiver shall only
apply to a yard setback that is not adjacent to a wetland. Further, any
development that provides at least 50% of its units as affordable or workforce
housing as defined in the Land Use Element of the Comprehensive Plan may be
eligible for a 50% reduction in the wetlands buffer requirements of this Ordinance.
g. Other Buffers. All other buffer requirements pursuant to Article XII of Zoning
Ordinance shall apply.
h. Restoration. In the event of a violation, the Zoning Administrator may have the
authority to order the restoration or reclamation of a wetland area based on the
recommendation of a 3 rd party professional environmental consultant. Fees
associated with hiring a professional environmental consultant and the
restoration or reclamation project shall be on the iolator.
XIV. APPEALS
Any affected person or alleged violator of this ordinance may apply for a variance, or appeal
a decision of the Zoning Administrator pursuant to this Ordinance to Georgetown County
Zoning Board of Appeals (ZBA), pursuant to Article XVI of the Georgetown County Code
Zoning Ordinance.
a. In addition to consideration of the materials submitted by the applicant and their
professional environmental consultant, the Board of Zoning Appeals should
consider other relevant factors, and shall require the applicant to demonstrate
evidence of such, including, but not limited to, the following:
Page 208 of 253
24
i. The functions and values of the wetlands in question;
ii. The proximity of the wetland to other waterbodies;
iii. The environmental impact of the proposed disturbance;
iv. Alternatives to the proposed disturbance and suitability of the area;
v. Threats to other properties from increases in flooding, erosion,
and/or pollution;
vi. The loss of wetland habitat and the loss of flora/fauna;
vii. The projected cumulative impact of the above factors in relation to
all known previous, pending, and reasonably anticipated future
wetland disturbances;
viii. Whether the purpose of the completed proposed project serves an
overriding public interest, as defined herein;
ix. Whether the activity is water dependent;
x. Input from members of the public, if applicable; and
xi. Input from federal, state, or local agencies, if applicable.
XV. MONITORING, REPORTING, AND ENFORCEMENT PROVISION
a. Criminal Penalties. Any person who violates any provision of this Ordinance or
who fails to comply with any of the requirements thereof shall be guilty of a
misdemeanor, according to Section 1-6, Georgetown County Code of Ordinances,
and punishable by a fine not to exceed five hundred dollars ($500.00). or
imprisonment for a term not to exceed thirty (30) days. In the case of a continuing
violation, each day’s violation shall constitute a separate and distinct offense.
b. Stop Work Orders; Permit Revocation or Suspension. The Zoning Administrator
may, through cooperation with zoning officials, building officials, code
enforcement, and the planning department if necessary, issue a Stop Work Order
if he/she finds that the holder of a Wetland Permit is in violation of provisions or
conditions of their approval, or if the permittee is in violation of other applicable
laws and/or regulations. Such notice shall be in writing and shall be given to the
owner of the property or to his/her agent, or to the person doing the work, or
posted in a conspicuous place at the job site.
Page 209 of 253
25
c. Restoration. In the event of a violation, the Zoning Administrator may have the
power to order the restoration or reclamation of a wetland area in the event of a
violation. If the responsible person or agent does not complete such restoration
within a reasonable time frame determined by the Zoning Administrator, County
Council shall have the authority to restore the affected wetlands to their prior
condition, and the person or agent responsible for the violation shall be held liable
to the County for the costs of such restoration.
d. Reporting Violations. Whenever a violation of this Ordinance is alleged, any
person may file a complaint with the Zoning Administrator. All such complaints
must be in writing, accompanied by photos and supporting evidence, if possible.
The Zoning Administrator shall record such complaints, immediately investigate,
and determine the appropriate course of action pursuant to the provisions of this
Ordinance.
e. Citizen Enforcement Provision. Causes of action resulting from the violation of
this Ordinance inure to any such person or persons damaged as a result of any
such violation. Georgetown County Court of Common Pleas has the jurisdiction
to restrain a violation of this Ordinance at the suit of the County or any person
adversely affected. The County shall not be held liable for any claims, damages,
or enforcement actions arising from such citizen-initiated proceedings. The
County shall not be a party to any legal actions or claims brought by affected
persons under this provision.
Page 210 of 253
Page 211 of 253
Page 212 of 253
Page 213 of 253
Page 214 of 253
Page 215 of 253
Page 216 of 253
Page 217 of 253
Page 218 of 253
Page 219 of 253
Page 220 of 253
Page 221 of 253
Page 222 of 253
Page 223 of 253
Page 224 of 253
Page 225 of 253
Page 226 of 253
Page 227 of 253
Page 228 of 253
Page 229 of 253
Page 230 of 253
Page 231 of 253
Page 232 of 253
Page 233 of 253
Page 234 of 253
Page 235 of 253
Page 236 of 253
Page 237 of 253
Page 238 of 253
Page 239 of 253
Page 240 of 253
Page 241 of 253
Page 242 of 253
Page 243 of 253
Page 244 of 253
Page 245 of 253
Page 246 of 253
Page 247 of 253
Page 248 of 253
Page 249 of 253
April 21, 2026
1
Georgetown County Council held a Regular Council Meeting on Tuesday, April 21, 2026, at 5:30 PM in
the Council Chambers, 129 Screven Street, Suite 213, Georgetown, South Carolina.
Present: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
Staff: Jackie Broach Angela Christian
Public Information Officer County Administrator
Alma D. Sierra John D. Watson
Clerk to Council County Attorney
Other staff members, members of the public, and representatives of the media were also present. In
accordance with the Freedom of Information Act, a copy of the agenda was sent to newspapers,
television, and radio stations, citizens of the County, Department Heads, and posted on the bulletin
board inside of the historic Courthouse.
The meeting was called to order at 5:31 PM. Councilor Bishop, Ernie Cooper Sr. gave an invocation and
led in the Pledge of Allegiance.
APPROVAL OF THE AGENDA
Chairman Clint Elliott made note that item 8a Proclamation No. 26-11 was moved from
proclamations and resolutions to presentations and special reports. Vice Chair Stella Mercado moved to
approve the move. Councilor Ron Charlton offered a second on the motion. Upon a call for discussion
from the Chairman, there was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
Councilman Bob Anderson made a move to approve meeting agenda as amended. Councilor Bishop,
Ernie L. Cooper Sr. offered a second on the motion. Upon a call for discussion from the Chairman, there
was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
SPECIAL REPORTS / PRESENTATIONS
Non-profit Spotlight – Open Space Institute
Erin Pate presented an overview of the value of nonprofits presenting to council to share on-the-ground
insights, then explains the mission of the Open Space Institute: protecting natural and historic
Page 250 of 253
April 21, 2026
2
landscapes to support recreation, wildlife, and communities. The organization works on large-scale land
conservation, often acquiring land and transferring it for public benefit. They emphasize the importance
of conservation in South Carolina amid rapid population growth, noting its role in preserving the
character of Georgetown County for future generations. Two major projects are discussed. First, the Pee
Dee Basin Initiative, a large-scale, multi-partner effort that conserved 62,000 acres across three counties
(including over 23,000 acres in Georgetown County), allowing continued timber use while preventing
development. Second, the Black River Initiative, which aims to create a network of protected lands and
public parks along the river. The first park, The Meadows, recently opened, with more parks and
recreational opportunities planned to boost ecotourism and local economic development. Overall, the
presentation underscores ongoing conservation efforts, public access expansion, and the long-term
benefits for the community and environment.
Proclamation No. 26-09
Following a brief report from Kisha Guess Black, Chief of Staff for Waccamaw Center for Mental Health.
Councilor Ron Charlton moved to approve Proclamation No. 26-09 – Proclaiming the Month of May as
“Mental Health Awareness” in Georgetown County. Councilor Bp. Ernie L. Cooper Sr. offered a second
on the motion. Upon a call for discussion from the Chairman, there was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
Proclamation No. 26-10
Following a brief report from Brandon Ellis, Assistant County Administrator. Vice Chair Stella Mercado
moved to approve resolution No. 26-10 – Honoring Jim Fitch for his 50 Years of Service. Councilor Bp.
Ernie L. Cooper Sr. offered a second on the motion. Upon a call for discussion from the Chairman, there
was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
Proclamation No. 26-11
Following a brief report from Holly Richardson, Planning Director. Councilor Bob Anderson moved to
adopt Proclamation 26-11 – proclaiming May 2026 as “Building Safety Month” in Georgetown County.
Councilor Louis R. Morant offered a second on the motion. Upon a call for discussion from the
Chairman, there was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
Page 251 of 253
April 21, 2026
3
CONSENT AGENDA
Bid #26-018, Aerial Mosquito Adulticide & Larvicide Spraying Service ($156,200). Awarded to
Williamsburg Air Service, Inc. at the budgeted amount.
Bid #26-004, Collection and Recycling of Used Cooking Oil. Awarded to No Limits Recycling, LLC for the
start of the service.
THIRD READING OF ORDINANCES
Ordinance No. 26-12
Following a brief report from Jay Watson, County Attorney. Councilor Bob Anderson moved to defer
Ordinance No. 26-12 – AUTHORIZING THE ISSUANCE AND SALE OF NOT EXCEEDING $25,000,000
GENERAL OBLIGATION BONDS, IN ONE OR MORE YEARS, IN ONE OR MORE SERIES, WITH APPROPRIATE
SERIES DESIGNATIONS, AND THE ISSUANCE OF GENERAL OBLIGATION BOND ANTICIPATION NOTES, IN
ONE OR MORE YEARS, IN ONE OR MORE SERIES, WITH APPROPRIATE SERIES DESIGNATIONS, BY
GEORGETOWN COUNTY, SOUTH CAROLINA; PROVIDING FOR THE FORM OF THE BONDS AND NOTES;
FIXING CERTAIN DETAILS OF THE BONDS AND NOTES; AUTHORIZING THE COUNTY ADMINISTRATOR OR
HIS LAWFULLY-AUTHORIZED DESIGNEE TO DETERMINE CERTAIN MATTERS RELATING TO THE BONDS
AND NOTES; PROVIDING FOR THE PAYMENT OF THE BONDS AND NOTES AND THE DISPOSITION OF THE
PROCEEDS THEREOF; AND OTHER MATTERS RELATING THERETO until May 12, 2026 due to insufficient
notice provided for the required public hearing. Councilor Louis R. Morant offered a second on the
motion. Upon a call for discussion from the Chairman, there was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
SECOND READING OF ORDINANCES
Ordinance No. 26-13
Following a report from Angela Christian, County Administrator, Councilor Louis R. Morant moved for
the second reading approval of Ordinance No. 26-13 – An ordinance to amend ordinance 2021-05 and to
ratify, authorize, reallocate, and approve expenditures under capital sales tax revenues for community
projects. Councilor Bp. Ernie L. Cooper Sr. offered a second on the motion. Upon a call for discussion
from the Chairman, there was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
Page 252 of 253
April 21, 2026
4
FIRST READING OF ORDIANNCES
Ordinance No. 26-14 – An Ordinance to Make Appropriations for Ordinary County Purposes for
Georgetown County for the Fiscal Year Beginning July 01, 2026, and Ending June 30, 2027; to
Provide for the Expenditure Thereof, to Provide for Revenues for the Payment Thereof, as well
as adjustments to various fee schedules
APPROVAL OF MINUTES
Regular Council Meeting- April 07, 2026
Councilor Ron J. Charlton moved for the approval of the minutes from the Regular Council Meeting held
on April 07, 2026. Councilor BP. Ernie L. Cooper Sr. offered a second on the motion. Upon a call for
discussion from the Chairman, there was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
DEFERRED OR PREVIOUSLY SUSPENDED ISSUES
Ordinance No. 25-13 - An Ordinance to amend Ordinance No. 20-59 pertaining to Georgetown County
Council's Rules of Procedure.
ADJOURNMENT
Upon a final call for any further business to be presented to Council from the Chairman, there was none.
Councilor Louis R. Morant moved to adjourn the meeting. Councilor Bob Anderson offered a second on
the motion. Upon a call for discussion from the Chairman, there was none.
In Favor: Bob Anderson Stella Mercado
Ron J. Charlton Louis R. Morant
Bp. Ernie L. Cooper Sr. Raymond L. Newton
Clint A. Elliott
The meeting was adjourned at 6:21 PM.
________________________________
Date
_________________________________
Clerk to Council
Page 253 of 253