County of Greenville Budget Document Fiscal Year 2026 167 CAPITAL PROJECTS Capital projects are submitted and approved through the multi-year Capital Improvement Planning process. This section of the document provides information on the multi-year capital improvement program, the current program status, a summary of capital projects and a copy of the Capital Improvement Policies. CAPITAL IMPROVEMENT PROGRAM The County of Greenville’s Capital Improvement Program is designed to identify major, infrequent and nonrecurring projects, which should be financed over a period of years. Greenville County has selected a programming period of 5 years. The development of a Capital Improvement Plan (CIP) involves a comprehensive evaluation of project planning, justification, coordination of needs, priorities and relationship to budgeting policies. Therefore, the capital improvement budget is considered with budget decisions. Capital improvement programming is a continuous process involving yearly adjust ments. The CIP includes capital projects recommended for fiscal years 2026 through 2030. Each fiscal year’s capital budget is submitted in conjunction with its respective operating budget. The CIP multi-year plan includes projects for which funding is currently available and for which future funding is reasonably assured. CAPITAL IMPROVEMENT PLANNING PROCESS Shown below is a graphic depiction of the process followed for capital improvement planning. July – December 2024 January – June 2025 Departmental program plans prepared and capital projects submitted to CIP team. November CIP Team Review Requests December CIP Team reviews, prioritizes and recommends capital program January -April County Council adopts CIP and capital budget May - June County Departments prepare CIP requests by December 9 Budget/Planning Staff compile project information by December 31 5-Year CIP and Capital Needs Assessment Developed by January 15 County Administrator’s Recommended Budget County of Greenville Budget Document Fiscal Year 2026 168 21.5% 64.0% 11.1% 3.3% Capital Projects by Fund Capital Projects Infrastructure Stormwater Enterprise Solid Waste $0 $50 $100 $150 $200 $250Millions CURRENT PROGRAM STATUS The FY2026-FY2030 Capital Improvement Program totals $299.770 million for projects in the areas of technological improvements, equipment, facilities, parks and recreation, infrastructure, stormwater, and solid waste. For the current budget, capital projects total $71.883 million for FY2026. Below are graphic comparisons of budgeted capital projects by fund and by type. The following page provides a detailed listing of capital projects and financing summary. In the capital projects fund, facility expenditures are by far the greatest percentage. Capital projects funded by the County’s enterprise funds are specific to each respective fund. CAPITAL PROJECTS BY TYPE Following is a graphic comparison of the capital improvements plan by type of improvements. The majority of improvements are for infrastructure improvements. Other major areas include stormwater, technology improvements, and equipment replacement. County of Greenville Budget Document Fiscal Year 2026 169 FY2026 FY2027 FY2028 FY2029 FY2030 TOTAL CAPITAL PROJECTS ($000 omitted) FUNDING SOURCE BUDGET PROPOSED PROPOSED PROPOSED PROPOSED FUNDS COUNTY GOVERNMENT DEPARTMENTS Technological Improvements Information Technology Capital Projects Fund 2.000$ 2.500$ 2.000$ 2.000$ 2.000$ 10.500$ GIS - Orthophotography and LIDAR Acquisition Capital Projects Fund 0.030 0.030 0.019 0.051 0.053 0.183 Register of Deeds Records Preservation Capital Projects Fund 0.150 0.650 0.300 0.300 0.300 1.700 GAMA Tax System Capital Projects Fund 2.678 - - - - 2.678 Body Cameras Capital Projects Fund 2.500 2.500 2.500 2.500 2.500 12.500 MDT Leaes Capital Projects Fund - 1.100 0.575 0.575 0.575 2.825 TOTAL 7.358$ 6.780$ 5.394$ 5.426$ 5.428$ 30.386$ Facilities/Construction Projects Flooring Replacements Capital Projects Fund 0.150$ 0.150$ -$ -$ -$ 0.300$ Cooling Tower Rebuild LEC and Courthouse Capital Projects Fund 0.141 - - - - 0.141 Animal Care Roof Replacement Capital Projects Fund 0.190 - - - - 0.190 Central Records Roof Replacement Capital Projects Fund - 0.425 - - - 0.425 Oneal Maintenance Roof Replacement Capital Projects Fund - 0.335 - - - 0.335 Travelers Rest Maintenance Roof Replacement Capital Projects Fund - - 0.335 - - 0.335 Courthouse Expansion and Security Upgrades State Contribution 3.000 - - - - 3.000 TOTAL 3.481$ 0.910$ 0.335$ -$ -$ 4.726$ Equipment Vehicle Replacements/Additions Debt Service - Lease 7.000$ 7.000$ -$ -$ -$ 14.000$ Public Works Equipment Road Program Fund 0.900 0.900 - - - 1.800 EMS - Stretcher replacement Capital Projects Fund 0.161 0.207 - - - 0.368 Interoperable Communications Radio Replacement Capital Projects Fund 2.000 2.000 2.100 - - 6.100 TOTAL 10.061$ 10.107$ 2.100$ -$ -$ 22.268$ Parks, Recreation, and Tourism Projects Road Paving and Sidewalk - Southside, Northside Parks Capital Projects Fund 1.700$ 1.500$ -$ -$ -$ 3.200$ Court Lighting - Southside, Northside, Lakeside Parks Capital Projects Fund 0.700 0.500 - - - 1.200 Playground Replacements Capital Projects Fund - 0.200 - - - 0.200 Park Master Plan - Oakland Plantation and Lakeside Capital Projects Fund - 0.300 0.300 Trail Extension and Improvement Capital Projects Fund 0.750 - - - - 0.750 Herdklotz Park - Turf Soccer Field Capital Projects Fund 1.400 - - - - 1.400 TOTAL 4.550$ 2.500$ -$ -$ -$ 7.050$ CAPITAL PROJECTS FUND TOTAL 25.450$ 20.297$ 7.829$ 5.426$ 5.428$ 64.430$ SPECIAL REVENUE FUNDS Infrastructure Road Program Road Program Fund 36.258$ 39.494$ 38.095$ 38.093$ 40.000$ 191.940$ SPECIAL REVENUE FUNDS TOTAL 36.258$ 39.494$ 38.095$ 38.093$ 40.000$ 191.940$ STORMWATER ENTERPRISE FUND Neighborhood Drainage Projects Enterprise Fund 0.600 0.600 0.600 0.600 0.600 3.000 Flood Mitigation Program Enterprise Fund 2.350 2.350 2.350 2.350 2.350 11.750 Water Quality Retrofit/Stream Stabilization Enterprise Fund 2.525 4.050 4.025 4.025 4.025 18.650 STORMWATER ENTERPRISE FUND TOTAL 5.475$ 7.000$ 6.975$ 6.975$ 6.975$ 33.400$ SOLID WASTE ENTERPRISE FUND Twin Chimneys Landfill Cell Construction Unit VI, Cell V Bond Proceeds 3.300 4.300 - - - 7.600 Equipment Replacement Bond Proceeds 1.400 1.000 - - - 2.400 SOLID WASTE ENTERPRISE FUND TOTAL 4.700$ 5.300$ -$ -$ -$ 10.000$ TOTAL FOR ALL CAPITAL PROJECTS 71.883$ 72.091$ 52.899$ 50.494$ 52.403$ 299.770$ CIP FINANCING SUMMARY FY2026-FY2030 County of Greenville Budget Document Fiscal Year 2026 170 Operating Budget $87.329 $485.057 million million Capital Budget $73.733 million Operating Budget 87% Capital Budget 13% OPERATING IMPACT DESCRIPTION Positive The project will either generate some revenue to offset expenses or reduce operating costs. No Impact The project will cause no change in operating costs. Negligible The impact will be very small; it will generate less than $10,000 per year in increased operating expenditures. Slight The impact will be between $10,001 and $50,000 in increased operating expenditures. Moderate The impact will be between $50,001 and $100,000 in increased operating expenditures. High The impact will increase operating expenditures $100,001 or more. RELATIONSHIP BETWEEN OPERATING AND CAPITAL BUDGETS Fiscal Year 2026 The chart below shows the relationship between the operating budget and capital expenditures for FY20 26. Capital expenditures of $73.733 million include capital projects of $60.183 million, loan proceeds of $7.000 million, a bond issue for Solid Waste of $4.7 million, and other capital items totaling $ 1.849 million. The impact on the $485.057 million operating budget is $27.146 million, which is the debt service for capital projects. There are no estimated operational costs for new projects in FY20 26. The $60.183 million for “pay- as-you-go” projects will come from fund balances in each respective fund and/or special revenue. Operating Impact $27.146 million for FY2026 Debt Service $27.146 million (Principal and Interest) Operations and Maintenance $0 million “Pay-as-you-go” - $60.183 million OPERATING IMPACTS A project might have an operating budget impact if the project includes the need for additional staff, maintenance, or daily operational costs. The amount of operating budget impact for each project is referred to in the following terms: County of Greenville Budget Document Fiscal Year 2026 171 FUNDING SOURCE DESCRIPTION Transfers A major source of smaller capital projects is transfers from operating funds in the County. General Obligation Bonds General Obligation Bonds are used to finance a variety of public projects. Article X, Section 14 of the constitution of the State of South Carolina, 1895, as amended, provides that counties shall have the power to incur bonded indebtedness in such a manner and upon such terms and conditions as the General Assembly shall prescribe by general law. General obligation debt may be incurred only for public and corporate purpose in an amount not exceeding 8% of the assessed value of all taxable property of each county. Special Source Revenue Bonds The South Carolina Code of Laws, Section 4-1-175 and 4-29-68 provides that counties can issue Special Source Revenue Bonds for the purpose of building or acquiring infrastructure necessary to continue the economic development of a county. The portion of the CIP which provides for the building or acquiring of infrastructure necessary to continue the economic development of the County is included in the Infrastructure Bank and funded through Special Source Revenue Bonds. The County has pledged the County portion of the revenue stream from the multi-county parks, which includes fee-in-lieu-of-taxes (FILOT) revenues. Capital Projects Reserve Another source utilized in the CIP is the capital project reserve account. This account contains any unspent funds from previously completed capital projects. The County's Financial Policies allow the County Administrator to include recommendations in the budget to dispose of unspent capital project funds. Pay-as-you-go Basis Another source utilized in the CIP is the pay-as-you-go basis either through ad valorem revenues or fees. The CIP utilizes a road maintenance fee of $25 per vehicle to fund a portion of the road program. Enterprise Fund Revenue For the County's two enterprise funds, Solid Waste and Stormwater, improvements are funded through each fund's respective revenue. FUNDING SOURCES The Capital Improvement Program utilizes a variety of funding sources to fund capital projects. These sources include: transfers from other funds, general obligation bonds, special source revenue bonds, capital project reserve funds, pay-as-you-go basis either through ad valorem revenues or fees, and enterprise fund revenue. The chart below provides a description of funding sources. County of Greenville Budget Document Fiscal Year 2026 172 PROJECT ITEMS FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT COST Information Technology 2.000$ 2.500$ 2.000$ 2.000$ 2.000$ 10.500$ GIS - Orthophotography and LiDAR Acquisition 0.030 0.030 0.019 0.051 0.053 0.183 Register of Deeds Records Preservation 0.150 0.650 0.300 0.300 0.300 1.700 GAMA Tax System 2.678 - - - - 2.678 Body Cameras 2.500 2.500 2.500 2.500 2.500 12.500 MDT Leases - 1.100 0.575 0.575 0.575 2.825 TOTAL PROJECT COST 7.358$ 6.780$ 5.394$ 5.426$ 5.428$ 30.386$ PROJECT FUNDING SOURCES FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT Capital Projects Fund 7.358$ 6.780$ 5.394$ 5.426$ 5.428$ 30.386$ TOTAL PROJECT FUNDING 7.358$ 6.780$ 5.394$ 5.426$ 5.428$ 30.386$ OPERATIONAL COSTS Operating Impact -$ -$ -$ -$ -$ -$ Cumulative Operating Impact - - - - - - CAPITAL IMPROVEMENT PROJECTS SUMMARY CAPITAL PROJECTS FUND The Capital Projects Fund is used to account for financial resources to be used for the acquisition or construction of major capital projects, other than those financed by proprietary funds. The FY20 26-FY2030 Capital Improvement Program includes a budget of $64.430 million for various capital projects in the areas of technological improvements, facility improvements, equipment, and parks and recreation projects. Each project is discussed in detail on the following pages. TECHNOLOGICAL IMPROVEMENTS No Impact on Operating Budget Description of Projects Technological improvements include funding for information technology, GIS, Tax Services, Register of Deeds, and the Sheriff’s Office. Information technology projects include upgrading various information technology projects, such as software package maintenance, AS400 maintenance, and new IT projects and upgrades. System upgrades are needed for increased reliability, speed and security. Funding is also proposed for the GIS acquisition of LiDAR data for the Geographic Information System. This data is used to determine where ground features have changed in Greenville County. Funds are also proposed for the Register of Deeds preservation project. This project will allow for the restoration and preservation of approximately 1,000 historical land record indexes and deed documents. All of these documents are considered permanent by South Carolina statute. The budget includes funds for the GAMA Tax System, which involves the conversion of two appraisal software products into one for more efficiency and consistency. Funding is also included for the Sheriff’s Office to acquire body -worn and dash cameras. These cameras provide reliable visual and audio evidence to verify events, document statements, and increase transparency with the community. Funding is included in future years for the payment of the annual leases for the mobile data terminals for the Sheriff’s Office as well. Impact on Operating Budget (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens ) Information technology improvements are budgeted in a capital project fund and financed with funds transferred from the Infrastructure Bank. The budget reflects the cost of purchasing necessary equipment and/or contractual costs. There will be no operating budget impact due to any of these projects. County of Greenville Budget Document Fiscal Year 2026 173 PROJECT ITEMS FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT COST Flooring Replacements 0.150$ 0.150$ -$ -$ -$ 0.300$ Cooling Tower Rebuild LEC and Courthouse 0.141 - - - - 0.141 Animal Care Roof Replacement 0.190 - - - - 0.190 Central Records Roof Replacement - 0.425 - - - 0.425 Oneal Maintenance Roof Replacement - 0.335 - - - 0.335 Travelers Rest Maintenance Roof Replacement - - 0.335 - - 0.335 Courthouse Expansion and Security Upgrades 3.000 - - - - 3.000 TOTAL PROJECT COST 3.481$ 0.910$ 0.335$ -$ -$ 4.726$ PROJECT FUNDING SOURCES FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT FUNDING Capital Projects Fund 0.481$ 0.910$ 0.335$ -$ -$ 1.726$ State Contribution 3.000 - - - - 3.000 TOTAL PROJECT FUNDING 3.481$ 0.910$ 0.335$ -$ -$ 4.726$ OPERATIONAL COSTS Operating Impact -$ -$ -$ -$ -$ -$ FACILITIES/CONSTRUCTION PROJECTS No Impact on Operating Budget Description of Projects Facility/Construction projects include funding for renovations and maintenance of facilities. These projects include flooring replacements at various County facilities, including the Courthouse, Law Enforcement Center, and Detention Center. Carpet and tile will be replaced in offices and common space. Another projects involves the rebuilding the cooling towers at the Courthouse and the Law Enforcement Center in order to provide improved circulation throughout the tower and facilitate the operation of the ch illers at these facilities. Funds are also included for the replacement of existing roof at the Animal Care facility, which is over 22 years old. The current roof has experienced leaks and become dangerous to perform work on them. The budget includes funds for the replacement of the roof at the Central Records facility. This facility houses a majority of the County archived records. The current roof has been in place since 1994. Roof replacements for other facilities are programmed in the next five years. R oofs will be replaced at the Travelers Rest Maintenance Facility and the Oneal Maintenance Facility. The current roof at the Travelers Rest facility was installed in 1990. Roof consultants recommend full replacement of the low slope and steep slope roof. The Oneal building is close to 100 years old and the roof is in a constant state of disrepair. The budget also includes funds for a courthouse expansion and security upgrades. The project involves the expansion of judicial offices at the County Courthouse, as well as security upgrades. These upgrades will include modern security cameras and monitoring equipment, updated key card access, perimeter protective barriers and secure parking solutions, as well as a new command center control board. Impact on Operating Budget (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens ) Facility/Construction projects are budgeted in a capital project fund. These projects are financed with funds transferred from the Infrastructure Bank and with contributions from the State of South Carolina for the courthouse expansion. County of Greenville Budget Document Fiscal Year 2026 174 PROJECT ITEMS FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT COST Vehicle Replacements/Additions $ 7.000 $ 7.000 $ - $ - $ - $ 14.000 Public Works Equipment 0.900 0.900 - - - 1.800 EMS - Stretcher Replacement 0.161 0.207 - - - 0.368 Radio Replacement 2.000 2.000 2.100 - - 6.100 TOTAL PROJECT COST 10.061$ 10.107$ 2.100$ -$ -$ 22.268$ PROJECT FUNDING SOURCES FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT FUNDING Capital Lease 7.000$ 7.000$ -$ -$ -$ 14.000$ Capital Projects Fund 3.061 3.107 2.100 - - 8.268 TOTAL PROJECT FUNDING 10.061$ 10.107$ 2.100$ -$ -$ 22.268$ OPERATIONAL COSTS Operating Impact -$ -$ -$ -$ -$ -$ EQUIPMENT Moderate Impact on Operating Budget Description of Projects Equipment projects include vehicle/heavy equipment replacement and additions , the replacement of EMS equipment, and radio replacement. Various vehicles and equipment will be replaced and/or added as needed through the County’s master lease program. Vehicle/equipment additions include heavy equipment for Public Works office marked patrol cars, and other vehicles as needed. Funds are also included for the replacement of sixteen stretchers for EMS over a two-year period. Stretchers have a lifespan of seven years. Replacement is recommended as these stretchers have reached the lifespan and the physical nature is in disrepair and poses a risk to patient care. The budget also includes the replacement of legacy radios due to South Carolina’s transition to TDMA (Time Division Multiple Access). Transition to TDMA allows for additional talk paths and increases the capacity of the system. Approximately 75% of the radios are for the Sheriff’s Office. The remaining 25% are for other County departments, including EMS, Emergency Management, Special Operations, Forensics, and the Coroner’s Office. Impact on Operating Budget (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens ) Vehicle/equipment replacements and addition projects are budgeted in a capital project fund and fin anced with a capital lease. EMS equipment replacement and radio replacement are budgeted in a capital project fund and financed with a transfer from the Infrastructure Bank . Operating costs will include the debt service for the capital lease. County of Greenville Budget Document Fiscal Year 2026 175 PROJECT ITEMS FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT COST Road Paving and Sidewalk Replacement 1.700$ 1.500$ -$ -$ -$ 3.200$ Court Lighting Replacement 0.700 0.500 - - - 1.200 Playground Replacements - 0.200 - - - 0.200 Park Master Plan for Oakland Plantation and Lakeside - 0.300 - - - 0.300 Trail Extension and Improvements 0.750 - - - - 0.750 Herdklotz Park Turf Soccer Fields 1.400 - - - - 1.400 TOTAL PROJECT COST 4.550$ 2.500$ -$ -$ -$ 7.050$ PROJECT FUNDING SOURCES FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT FUNDING Capital Projects Fund 4.550$ 2.500$ -$ -$ -$ 7.050$ TOTAL PROJECT FUNDING 4.550$ 2.500$ -$ -$ -$ 7.050$ OPERATIONAL COSTS Operating Impact -$ -$ -$ -$ Cumulative Operating Impact - - - - - - PARKS, RECREATION, AND TOURISM PROJECTS No Impact on Operating Budget Description of Projects Projects for the Parks, Recreation, and Tourism Department include repaving of roadways, parking lots and sidewalks at Southside and Northside parks; replacement of court lighting systems at Southside and Northside tennis/pickleball courts and Lakeside basketball courts; replacement of existing playground equipment at Pittman Park; development of master plan and construction documents for Oakland Plantation development and Lakeside Park renovations; expansion of current trail system from Verdae Boulevard to Millennium Boulevard at CU-ICAR and replacement of small bridge near Willard Street; and turf for soccer field at Herdklotz Park. Impact on Operating Budget (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens ) Parks, Recreation, and Tourism capital projects are budgeted in a capital project fund. Projects will be funded through a transfer from the Parks, Recreation, and Tourism special revenue fund. No additional impact on the operating budget is anticipated. County of Greenville Budget Document Fiscal Year 2026 176 PROJECT ITEMS FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT COST Road Program 36.258$ 39.494$ 38.095$ 38.093$ 40.000$ 191.940$ TOTAL PROJECT COST 36.258$ 39.494$ 38.095$ 38.093$ 40.000$ 191.940$ PROJECT FUNDING SOURCES FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED PROJECT FUNDING Special Revenue Fund - Road Program 36.258$ 39.494$ 38.095$ 38.093$ 40.000$ 191.940$ TOTAL PROJECT FUNDING 36.258$ 39.494$ 38.095$ 38.093$ 40.000$ 191.940$ OPERATIONAL COSTS Operating Impact -$ -$ -$ -$ -$ -$ Cumulative Operating Impact - - - - - - CAPITAL IMPROVEMENTS PROJECTS SUMMARY SPECIAL REVENUE FUNDS The Road Program Special Revenue Fund is used to finance capital infrastructure improvements. The FY2026-FY2030 Capital Improvement Program includes a budget of $191.940 million for infrastructure capital projects. INFRASTRUCTURE IMPROVEMENTS No Impact on Operating Budget Description of Projects Road improvements include rehabilitation and/or reconstruction of “worst roads” first on a countywide basis. Planned projects are consistent with Council approved programs to reduce risk to public safety and to improve deteriorating road structures. The road program also includes a contribution for local municipality road programs. Impact on Operating Budget (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens ) Funding for the road program is included in the capital projects fund and is financed through road maintenance fees, a transfer from the Infrastructure Bank, and Road Program fund balances. This project provides direct benefit to citizens through road and bridge improvements. No additional impact on the operating budget is anticipated. County of Greenville Budget Document Fiscal Year 2026 177 PROJECT ITEMS FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT COST Neighborhood Drainage Projects 0.600$ 0.600$ 0.600$ 0.600$ 0.600$ 3.000$ Flood Mitigation Program 2.350 2.350 2.350 2.350 2.350 11.750 Water Quality Retrofits/Stream Stable 2.525 4.050 4.025 4.025 4.025 18.650 TOTAL PROJECT COST 5.475$ 7.000$ 6.975$ 6.975$ 6.975$ 33.400$ PROJECT FUNDING SOURCES FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT FUNDING Enterprise Fund Revenue 5.475$ 7.000$ 6.975$ 6.975$ 6.975$ 33.400$ TOTAL PROJECT FUNDING 5.475$ 7.000$ 6.975$ 6.975$ 6.975$ 33.400$ OPERATIONAL COSTS Operating Impact -$ -$ -$ -$ -$ -$ Cumulative Operating Impact - - - - - - CAPITAL IMPROVEMENTS PROJECTS SUMMARY PROPRIETARY FUNDS The County operates two enterprise funds: Solid Waste and Stormwater. Capital projects within these funds are accounted for in the appropriate proprietary enterprise fund. The FY20 26-FY2030 Capital Improvement Program includes a budget of $33.400 million for various capital projects in the area of Stormwater. The Program includes a budget of $10.000 million for projects in the area of Solid Waste. STORMWATER ENTERPRISE FUND No Impact on Operating Budget Description of Projects Capital projects for Stormwater include funding for neighborhood drainage projects, repair of structures at the August Grove SWM Pond River, NPDES/water quality retrofit projects, and flood mitigation program. These projects are consistent with County Council’s goals for infrastructure which provide for funding to resolve drainage problems and for stormwater flood project. Impact on Operating Budget (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens ) Funding for these projects is included in the stormwater enterprise fund and is funded through revenue received in that fund. No additional impact on the operating budget is anticipated. County of Greenville Budget Document Fiscal Year 2026 178 PROJECT ITEMS FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT COST Twin Chimneys Landfill Cell Construction 3.300$ 4.300$ -$ 7.600$ Equipment Replacement 1.400 1.000 - 2.400 TOTAL PROJECT COST 4.700$ 5.300$ -$ -$ -$ 10.000$ PROJECT FUNDING SOURCES FY2026 BUDGET FY2027 PROPOSED FY2028 PROPOSED FY2029 PROPOSED FY2030 PROPOSED TOTAL PROJECT FUNDING Bond Proceeds 4.700$ 5.300$ -$ -$ -$ 10.000$ TOTAL PROJECT FUNDING 4.700$ 5.300$ -$ -$ -$ 10.000$ OPERATIONAL COSTS Operating Impact -$ -$ -$ -$ -$ -$ Cumulative Operating Impact - - - - - - SOLID WASTE ENTERPRISE FUND No Impact on Operating Budget Description of Projects Capital projects for Solid Waste include funding for landfill cell construction and heavy equipment replacement. Impact on Operating Budget (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens ) Funding for the road program is included in the solid waste enterprise fund and is anticipate to be funded through a bond issue. No additional impact on the operating budget is anticipated.

Source: Greenville County website. First collected Oct 13, 2026.