County of Greenville Budget Document
Fiscal Years 2014 and 2015
145
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
REVENUES BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
Fleet Management
CHARGES FOR SERVICES 6,590,000$ 7,638,200$ 6,590,000$ 7,472,115$ 7,459,700$ 7,479,700$ 14,939,400$
FUND BALANCE USAGE (CONTRIBUTION) (22,362) (93,888) 15,352 (93,255) (29,369) (8,235) (37,604)$
Total Fleet Management 6,567,638$ 7,544,312$ 6,605,352$ 7,378,860$ 7,430,331$ 7,471,465$ 14,901,796$
Health and Dental
HEALTH INSURANCE PREMIUMS 22,239,250 23,297,483 22,759,342 23,542,431 24,757,295 25,683,853 50,441,148
FUND BALANCE USAGE (CONTRIBUTION) 1,378,575 3,726,207 1,567,018 1,610,776 317,019 (266,366) 50,653
Total Health and Dental 23,617,825$ 27,023,690$ 24,326,360$ 25,153,207$ 25,074,314$ 25,417,487$ 50,491,801$
Workers Compenstion
WORKERSCOMPENSATION 2,066,370 2,407,481 2,066,723 2,383,094 2,348,180 2,374,762 4,722,942
FUND BALANCE USAGE (CONTRIBUTION) (37,923) (306,332) (19,851) (174,017) 555,317 631,977 1,187,294
Total Workers Compensation 2,028,447$ 2,101,149$ 2,046,872$ 2,209,077$ 2,903,497$ 3,006,739$ 5,910,236$
TOTAL FUNDS 32,213,910$ 36,669,151$ 32,978,584$ 34,741,144$ 35,408,142$ 35,895,691$ 71,303,833$
EXPENDITURES
FLEET MANAGEMENT 6,567,638$ 7,544,312$ 6,605,352$ 7,669,351$ 7,430,331$ 7,471,465$ 14,901,796$
HEALTH AND DENTAL 23,617,825 27,023,690 24,326,360 26,065,343 25,074,314 25,417,487 50,491,801
WORKERS COMPENSATION 2,028,447 2,101,148 2,046,872 2,381,199 2,903,497 3,006,739 5,910,236
TOTAL EXPENDITURES 32,213,910$ 36,669,150$ 32,978,584$ 36,115,892$ 35,408,142$ 35,895,691$ 71,303,833$
POSITION SUMMARY 20.00 20.00 20.00 20.00 20.00 20.00
FTE SUMMARY 20.00 20.00 20.00 20.00 20.00 20.00
FY2013 actual expenditures are unaudited as of the printing date of this document.
OPERATING BUDGETS
INTERNAL SERVICE FUNDS
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
FY2012 FY2013 FY2014 FY2015
INTERNAL SERVICE FUNDS
Comparison of Total Expenditures
Workers Comp Fleet Mgt Health and Dental
PROPRIETARY FUNDS
Proprietary funds are used to account for activities, which are similar to those found in the private sector. The
County’s proprietary fund types are its internal service funds and its enterprise funds.
INTERNAL SERVICE FUNDS
Greenville County operates three internal service funds: Fleet Management, the Workers Compensation Fund,
and the Health and Dental Fund. The Fleet Management Division is responsible for maintenance and repair on
the County’s vehicles (including heavy equipment). The Workers Compensation Fund, in contrast to the medical
self-insurance program, serves only those personnel on Greenville County’s payroll. The Health and Dental Fund
is maintained to account for the County’s self-insurance program for health. Coverage in the medical/dental
self-insurance program is extended to include various Greenville County agencies including the Art Museum,
County Library, and other agencies.
County of Greenville Budget Document
Fiscal Years 2014 and 2015
146
Actual Projected Target Target
Performance Indicators 2012 2013 2014 2015
# vehi cl e acci dents 178 183 178 169
% annual reduction in accidents 10% 10% 10% 5%
% quarterly reports provided on time 100% 100% 100% 100%
% inventory evaluated annually 100% 100% 100% 100%
% com ple tion of A .S.E. ce rtification 95% 100% 100% 100%
Program Goal 2: To attai n A.S.E. (Automoti ve Servi ce Excel l ence) Bl ue Seal operati onal status whi ch requi res 75% A.S.E.
Te chnician Ce rtification
Objective 2(a): To meet 100% A.S.E. certification by the end of FY2013
Program Goal 1: To assi st ri sk management to provi de for overal l safety and dri ver effi ci ency
Objective 1(a): To reduce the number of County vehicle accidents by 10% annually
Objective 1(b): To effectively communicate accident history data to the Accident Review Board and Safety Committee on a
quarterly basis
Objective 1(c): To evaluate equipment inventory values annually in order to obtain lowest premium rate
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
FLEET MANAGEMENT BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
PERSONNEL SERVICES 1,266,264 1,346,355$ 1,303,978 1,275,524$ 1,378,957$ 1,423,049$ 2,802,006$
OPERATING EXPENSES 5,294,664 6,194,745 5,294,664 6,391,071 6,044,172 6,041,214 12,085,386
CONTRACTUAL CHARGES 6,710 3,212 6,710 2,757 7,202 7,202 14,404
CAPITAL OUTLAY - - - - - -
TOTALS 6,567,638 7,544,312$ 6,605,352 7,669,351$ 7,430,331$ 7,471,465$ 14,901,796$
POSITION SUMMARY 20.00 20.00 20.00 20.00 20.00 20.00
FTE SUMMARY 20.00 20.00 20.00 20.00 20.00 20.00
FY2013 actual expenditures are unaudited as of the printing date of this document.
FLEET MANAGEMENT
Description
Although the Fleet Management Division operates as an internal service fund, it is also a division of the General
Services Department, and thereby operates under the Department’s mission statement. The Fleet Management
Division provides cost efficient and timely routine maintenance, minor and major repairs and fuel distribution at
the County’s six fueling locations for the county’s vehicle and equipment fleet. Services are provided to all
internal County departments and are offered to several outside agencies.
Financial Data
The biennium budget for the Fleet Management Division for the fiscal years 201 4 and 2015 is $14,901,796,
which is 13.12% more than the previous biennium budget. Increases are attributed to salary and benefit
adjustments as well as fluctuation in fuel prices. The FY2014 and FY2015 budgets allow for 20.00 full-time
equivalent positions.
Goals and Performance Measures
Supports Long-Term Goal(s): III-Fiscal Condition
Accomplishments and Other Activities
During the past fiscal year, the Fleet Management Division continued the safe driver program for all County
departments to ensure that all County employees driving County vehicles are trained properly. The Division
installed propane fueling stations at three sites and converted several vehicles to propane fuel. Throughout the
year, Fleet Management staff completed certifications. The Division has maintained seven consecutive years as
an Automatic Service Excellence (ASE) Blue Seal Certified Facility and has five ASE Certified Master Technicians.
In the next biennium budget, Fleet Management will recondition the auto shop exhaust ventilation system;
reorganize the confiscated vehicle lot; remount new ambulances for EMS; and establish new parameters to
further downsize and/or reduce fleet and reduce emissions.
County of Greenville Budget Document
Fiscal Years 2014 and 2015
147
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
WORKERS COMPENSATION BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
PERSONNEL SERVICES
OPERATING EXPENSES 1,628,447$ 1,701,148$ 1,646,872$ 1,981,199$ 1,903,497$ 2,006,739$ 3,910,236$
CONTRACTUAL CHARGES
CAPITAL OUTLAY
OTHER FINANCING USES 400,000 400,000 400,000 400,000 1,000,000 1,000,000 2,000,000
TOTALS 2,028,447$ 2,101,148$ 2,046,872$ 2,381,199$ 2,903,497$ 3,006,739$ 5,910,236$
POSITION SUMMARY N/A N/A N/A N/A N/A N/A
FTE SUMMARY N/A N/A N/A N/A N/A N/A
FY2013 actual expenditures are unaudited as of the printing date of this document.
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
HEALTH AND DENTAL BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
PERSONNEL SERVICES
OPERATING EXPENSES 23,617,825$ 27,023,690$ 24,326,360$ 26,065,343$ 25,074,314$ 25,417,487$ 50,491,801$
CONTRACTUAL CHARGES - - - - - -
CAPITAL OUTLAY - - -
TOTALS 23,617,825 27,023,690$ 24,326,360 26,065,343$ 25,074,314$ 25,417,487$ 50,491,801$
POSITION SUMMARY N/A N/A N/A N/A N/A N/A
FTE SUMMARY N/A N/A N/A N/A N/A N/A
FY2013 actual expenditures are unaudited as of the printing date of this document.
WORKERS COMPENSATION FUND
Description and Financial Data
The Workers Compensation Fund serves personnel on Greenville County’s payroll . The biennium budget for the
Workers Compensation Fund for the fiscal years 2014 and 2015 totals $5,910,236.
HEALTH AND DENTAL FUND
Description and Financial Data
The Health and Dental fund is maintained to account for the County’s self -insurance program for health.
Funding is based on the history of the past four quarters to determine a new annualized amount to fund the
program. The payment of claims is handled through Planned Administrators. The biennium budget for the
Health and Dental Fund for the fiscal years 2014 and 2015 totals $50,491, 801.
County of Greenville Budget Document
Fiscal Years 2014 and 2015
148
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
FY2012 FY2013 FY2014 FY2015
ENTERPRISE FUNDS
Comparison of Total Expenditures
Solid Waste Land Development
Floodplain Mgt Soil and Water
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
REVENUES BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
Solid Waste
PROPERTY TAXES 4,212,939$ 3,751,660$ 4,212,939$ 3,967,028$ 3,471,368$ 3,537,682$ 7,009,050$
CHARGES FOR SERVICES 4,200,000 4,173,562 4,200,000 4,400,000 4,600,000 4,600,000 9,200,000
OTHER 840,000 991,910 840,000 830,000 805,000 805,000 1,610,000
FUND BALANCE USAGE (CONTRIBUTION) (1,661,273) (1,963,299) (381,503) (410,159) 1,858,094 (977,990) 880,104
Total Solid Waste 7,591,666$ 6,953,833$ 8,871,436$ 8,786,869$ 10,734,462$ 7,964,692$ 18,699,154$
Stormwater
STORMWATER FEES 7,553,746$ 7,723,722$ 7,629,283$ 7,901,282$ 8,059,308$ 8,220,494$ 16,279,802$
STORMWATER OTHER 150,000 120,505 150,000 130,000 150,000 150,000 300,000
FUND BALANCE USAGE (CONTRIBUTION) 2,043,097 (537,604) 2,127,688 (911,688) 3,059,562 2,996,820 6,056,382
Total Stormwater 9,746,843$ 7,306,623$ 9,906,971$ 7,119,594$ 11,268,870$ 11,367,314$ 22,636,184$
TOTAL FUNDS 17,338,509$ 14,260,456$ 18,778,407$ 15,906,463$ 22,003,332$ 19,332,006$ 41,335,338$
EXPENDITURES
SOLID WASTE 7,591,666$ 6,953,830$ 8,871,436$ 5,845,823$ 10,734,462$ 7,964,692$ 18,699,154$
Stormwater
FLOODPLAIN MANAGEMENT 6,014,024$ 2,588,086$ 6,026,288$ 2,308,954$ 5,811,431$ 5,827,054$ 11,638,485$
LAND DEVELOPMENT 3,360,229 3,608,347 3,394,165 3,307,197 4,995,202 5,069,208 10,064,410
SOIL AND WATER 372,590 274,911 486,518 397,831 462,237 471,052 933,289
Total Stormwater 9,746,843$ 6,471,344$ 9,906,971$ 6,013,982$ 11,268,870$ 11,367,314$ 22,636,184$
TOTAL EXPENDITURES 17,338,509$ 13,425,174$ 18,778,407$ 11,859,805$ 22,003,332$ 19,332,006$ 41,335,338$
POSITION SUMMARY 80.00 80.00 81.00 81.00 83.00 83.00
FTE SUMMARY 74.00 74.00 75.00
75.00 80.00 80.00
FY2013 actual expenditures are unaudited as of the printing date of this document.
OPERATING BUDGETS
ENTERPRISE FUNDS
ENTERPRISE FUNDS
Greenville County currently operates two enterprise funds: Solid Waste and Stormwater. Both of these divisions
are a part of the County’s Community Development and Planning Department. The Solid Waste Fund accounts
for operations of the County’s waste disposal and landfill. The Stormwater Fund accounts for the Soil and Water
Division, Land Development Division, and the Floodplain Management Division. The following chart reflects a
summary of revenues and expenditures for the Enterprise Funds.
County of Greenville Budget Document
Fiscal Years 2014 and 2015
149
Actual Projected Target Target
Performance Indicators 2012 2013 2014 2015
# tons of MSW disposed in Class III 228,793 225,000 250,000 260,000
# tons of inert waste disposed of in Class II 75,371 87,000 80,000 81,000
# tons of yard waste processed into mulch 4,173 5,700 4,300 4,400
# tons of banned materials managed 9,000 5,100 10,000 10,000
# total tons managed 317,337 320,000 344,300 355,400
# full-time heavy equipment operator positions 13 13 12 12
# tons managed per empl oyee 23,846 24,615 28,691 29,616
# facilitie s m onitore d for DHEC com pliance 7 7 7 7
% e m ploye e s m aintaining DHEC ce rtification 38% 38% 41% 41%
% compliance with DHEC permits/procedures 100% 100% 100% 100%
$ fines for non-compliance with DHEC $0 $0 $0 $0
# risk assessments conducted annually 47 47 48 48
% employees attending compliance training 96% 98% 98% 98%
Program Goal 1: To inspect, identify and manage Greenville Municipal Solid Waste (MSW) stream
Objective 1(a): To effectively manage the MSW stream and provide proper disposal for additional waste due to increases in
population by FY2013 with no increase in full-time heavy equipment operator positions
Program Goal 2: To im prove safe ty within the division
Objective 2(a): To provide adequate training and mitigate risk so as to decrease the number of vehicle accidents and
injuries by FY2013
Objective 1(b): To provide qualified personnel to ensure compliance with federal, state, and local regulations as outlined in
applicable pe rm its with no violations or fine s
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
SOLID WASTE BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
PERSONNEL SERVICES 2,003,705$ 1,906,517$ 2,063,475$ 1,998,764$ 2,197,467$ 2,267,684$ 4,465,151$
OPERATING EXPENSES 4,039,761 3,964,319 4,909,761 2,829,711 6,908,735 3,638,748 10,547,483
CONTRACTUAL CHARGES 1,198,200 1,061,714 1,198,200 1,008,475 1,378,260 1,408,260 2,786,520
CAPITAL OUTLAY 350,000 21,281 700,000 8,873 250,000 650,000 900,000
TOTALS 7,591,666$ 6,953,830$ 8,871,436$ 5,845,823$ 10,734,462$ 7,964,692$ 18,699,154$
POSITION SUMMARY 50.00 50.00 50.00 50.00 50.00 50.00
FTE SUMMARY 44.00 44.00 44.00 44.00 47.00 47.00
FY2013 actual expenditures are unaudited as of the printing date of this document.
SOLID WASTE
Description
Although the Solid Waste Division operates as an enterprise fund, it is also a division of the Community
Development and Planning Department. The Solid Waste Division provides disposal, recycling, and collection
and post closure services. Elements within these services include disposal operations, collection operations,
recycling, and closed landfill maintenance. The mission of the Solid Waste Division is to provide customers with
quality public services and facilities through innovative technology while meeting future challenges, protecting
the environment, and conserving county resources.
Financial Data
The biennium budget for the Solid Waste Division for FY2014 and FY2015 is $18,699,154, which is 13.58% more
than the previous biennium budget. This increase is attributed to the inclusion of salary and benefit adjustments
to personnel services and operational costs to begin cell V at the Twin Chimneys Landfill . The number of full-
time equivalent positions is 47.00 for both years.
Goals and Performance Measures
Supports Long-Term Goal(s): II-Infrastructure
County of Greenville Budget Document
Fiscal Years 2014 and 2015
150
Actual Projected Target Target
Performance Indicators 2012 2013 2014 2015
% empl oyees attendi ng weekl y safety trai ni ng 71% 60% 60% 60%
% risk assessments conducted annually 100% 100% 100% 100%
# vehicle accidents (on and off road) 3 7 3 3
# i njuri es 5 2 2 2
# tons banned materials transported from remote drop-
off locations 19,613 15,100 20,000 22,000
# banned material loads transported from remote
drop-off locations 1,950 1,668 2,000 2,200
# tons per load transported to landfill 10.1 9.3 10.5 11.0
# drop-off facilitie s 6 6 6 6.0
% increase in tons per load from 2012 benchmark 10% 10% 10% 10%
# tons generated at recycl i ng faci l i ti es 37,783 34,000 38,000 38,500
# full-tim e drive rs 4 4 4 4
# tons recycl abl es transported 5,811 5,425 5,900 6,000
# loads pulled 4,201 4,540 4,300 4,400
# tons per load 1.38 1.30 1.39 1.40
# drop-off containers 30 28 32 33
cost per ton $87 $93 $85 $83
Program Goal 3: To provide efficient collection of MSW and banned materials in the unincorporated areas of the County
Objective 3(a): To maintain the efficiency of transporting banned materials from the remote drop-off facilities. This will be
achieved by maintaining the average weight per container at 9 tons through FY2013
Objective 3(b): To m anage additional waste at the six re side ntial waste and re cycling facilitie s without incre ase FTEs
Program Goal 4: To provide efficient collection of recyclables in the unincorporated area of the county
Objective 4(a): To increase the efficiency and reduce the cost of transporting recyclables; this will be achieved by increasing
the weight of the containers to 1.3 tons in FY12 and 1.35 tons in FY13
Aerial View of Twin Chimneys Landfill
Solid Waste - continued
Accomplishments and Other Activities
During the past year, the Solid Waste Division developed and implemented a robust tire repair and
replacement program reducing expenditures by approximately 40%. The Division reduced downtime by
implementing a new operator level preventive maintenance program. Electronic waste collection sites were
established at the Twin Chimneys Landfill and the six convenience
centers. The Division held several recycling events with public private
partnerships and conducted several county wide litter pick-up events.
Solid Waste increased waste density from 1,458 pounds per cubic
yard to 1,541 in FY2012. This equates to an additional 9% capacity
and a reduction in the cost per cubic yard to construct/operate from
$15 to $13.75 per year. During FY2014/FY2015, Solid Waste will
update the e-waste consolidation area to package value rich materials
for marketing. They will also seek additional sources of bio-solids and
processing waste to increase the moisture content of the waste,
thereby speeding degradation and increasing compaction.
County of Greenville Budget Document
Fiscal Years 2014 and 2015
151
Actual Projected Target Target
Performance Indicators 2012 2013 2014 2015
total variances 1 1 1 1
# approved variances 1 0 1 1
# deni ed vari ances 0 1 0 0
# variances that have detrimental effect on floodplain 0 0 0 0
# proposed acquisitions 23 24 20 20
# successful acquisitions 13 14 15 15
# structural projects 9 9 10 10
# hours (16 hours bi-annual required - 9 certified
floodplain managers) 144 hrs/2 yrs 128 144 144 144
Program Goal 1: To effectively administer and enforce regulations and programs that ensure any actions that would be
detrimental to public safety and well being as it relates to development in the floodplain
Objective 1(a): To lim it variance s issue d in the are as of Spe cial Flood Hazard
Objective 1(b): To continue the effective flood mitigation program through acquisitions and structural projects
Objective 1(c): To maintain continuing education hours for Certified Floodplain Managers within the division
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
FLOOD PLAIN MANAGEMENT BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
PERSONNEL SERVICES 411,840$ 485,240$ 424,104$ 481,984$ 489,356$ 504,979$ 994,335$
OPERATING EXPENSES 288,178 243,887 288,178 229,989 312,918 311,918 624,836
CONTRACTUAL CHARGES 9,000 8,989 9,000 7,241 9,000 9,000 18,000
CAPITAL OUTLAY 5,305,006 1,849,969 5,305,006 1,589,740 5,000,157 5,001,157 10,001,314
TOTALS 6,014,024$ 2,588,086$ 6,026,288$ 2,308,954$ 5,811,431$ 5,827,054$ 11,638,485$
POSITION SUMMARY 7.00 7.00 8.00 8.00 8.00 8.00
FTE SUMMARY 7.00 7.00 8.00 8.00 8.00 8.00
FY2013 actual expenditures are unaudited as of the printing date of this document.
STORMWATER MANAGEMENT
The Stormwater Management Enterprise Fund is responsible for expenses related to the NPDES MS4 permit and
Stormwater Taskforce recommendations. This enterprise fund is supported by a stormwater utility fee and
consists of three divisions: Floodplain Management, Land Development, and Soil and Water. The Stormwater
Management Fund helps citizens conserve, improve and sustain natural resources in Greenville County.
FLOODPLAIN MANAGEMENT
Description
The Floodplain Management Division was developed in FY2012. The Division was developed from portions of
other areas of the Community Development and Planning Department. This Division is responsible for floodplain
management, watershed studies, floodplain buyouts and floodpl ain remediation to include bridge and culvert
replacement in the various watersheds on county road crossing, stream banks, and floodplain restoration. In
addition, the Division oversees the hazard mitigation plan and floodplain permitting.
Financial Data
The biennium budget for Floodplain Management Division for FY2014 and FY2015 is $11,638,485. The number
of full-time equivalent positions is 8.00 for both years of the biennium.
Goals and Performance Measures
Supports Long-Term Goal(s): II-Infrastructure; V-Economic Development
County of Greenville Budget Document
Fiscal Years 2014 and 2015
152
Actual Projected Target Target
Performance Indicators 2012 2013 2014 2015
# projects revi ewed 350 400 425 450
# projects in the floodplain 70 65 70 75
# inquiries resulting in a review and determination of
any flood zone 276 300 325 350
Objective 1(d): To review all development activity in the County
Objective 1(e): General floodplain determinations received from the general public, realtors, banks, insurance companies
Floodplain Management - continued
Accomplishments and Other Activities
During the past budget, the Floodplain Management Division participated with FEMA, SC Department of Natural
Resources and AECOM in the development of the revised Flood Insurance Risk Maps (FIRM). Three major
watershed studies were finalized and implemented. The Division continued acquisition of structures through the
flood mitigation program. They also completed annual review and update o f the multi-hazard mitigation
program. Floodplain Management participates in the development of data for the annual County Water Quality
Analysis Plan. During FY2014/FY2015, the Division will review and develop new legislation to accept the new
flood insurance rate map; continue implementation of the multi-hazard mitigation plan; continue participation
in the community rating system program to maintain a Class 8 rating; review all proposed development projects;
and conduct field inspections and investigations of development and activity in the floodplain.
County of Greenville Budget Document
Fiscal Years 2014 and 2015
153
Actual Projected Target Target
Performance Indicators 2012 2013 2014 2015
# subdivision road plans reviewed 0 6 8 10
% plans reviewed within 30 days 100% 100% 100% 100%
# fi nal pl ats revi ewed 25 36 45 60
# final plats reviewed within 10 days 23 35 45 60
# subdivision inspections conducted 272 200 250 275
# subdivisions accepted 17 15 20 20
# bond expirations checked 101 125 120 130
# pre-desi gn meeti ngs hel d 128 152 190 200
# land disturbance permits issued 153 200 250 275
# summary pl ats revi ewed 20 30 30 32
# stormwater/erosion control inspections made 4,003 3,850 5,000 5,000
# violations issue d 61 100 100 100
# citations / consent orders issued 0 1 5 5
# land disturbance permits closed 155 122 130 150
Program Goal 1: To maximize life expectancy of roads and their riding surface condition by ensuring that the road
infrastructure within the County's inventory is designed and built to the Land Development regulations
Objective 1(a): To assist developers with the local permitting process thereby ensuring new roads are accepted by the
County for maintenance
Objective 2(a): To ensure stormwater discharges from construction activity does not contribute pollutants to surface waters
of the state
Program Goal 2: To protect and strengthen the general water quality through effectual stormwater management strategies
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
LAND DEVELOPMENT BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
PERSONNEL SERVICES 1,139,433$ 1,038,721$ 1,173,369$ 1,107,343$ 1,391,175$ 1,436,073$ 2,827,248$
OPERATING EXPENSES 309,387 406,870 309,387 463,028 466,787 474,147 940,934
CONTRACTUAL CHARGES 1,911,409 1,628,293 1,911,409 1,491,219 1,872,240 1,871,328 3,743,568
CAPITAL OUTLAY - 534,462 - 245,607 1,265,000 1,287,660 2,552,660
TOTALS 3,360,229$ 3,608,347$ 3,394,165$ 3,307,197$ 4,995,202$ 5,069,208$ 10,064,410$
POSITION SUMMARY 19.00 19.00 19.00 19.00 21.00 21.00
FTE SUMMARY 19.00 19.00 19.00 19.00 21.00 21.00
FY2013 actual expenditures are unaudited as of the printing date of this document.
LAND DEVELOPMENT
Description
Services of the Land Development Division include reviewing the engineering plans for all land disturbing
activities in the county prior to the issuance of a grading permit and inspecting sites to ensure that plans are
being implemented as part of the Stormwater Management and Sediment Control Ordinance. The Division also
handles tasks related to the NPDES permit. NPDES stands for National Pollutant Discharge Elimination Sys tem,
which is the compliance system for the Clean Water Act. NPDES requires that all stormwater discharges that
enter waters of the United States meet minimum federal water quality requirement.
Financial Data
The biennium budget for the Land Development Division for FY2014 and FY2015 is $10,064,410. Budget
enhancements include two capital projects: NPDES water quality retrofits and a centralized electronic permitting
process. The number of full-time equivalent positions is 21.00 for both years of the biennium.
Goals and Performance Measures
Supports Long-Term Goal(s): II-Infrastructure; V-Economic Development
County of Greenville Budget Document
Fiscal Years 2014 and 2015
154
Actual Projected Target Target
Performance Indicators 2012 2013 2014 2015
# i nspecti ons performed 535 700 714 721
# storm wate r facilitie s non-com pliant 192 245 250 252
# notices to property owners within 10 days of
inspection 192 245 250 252
# storm wate r facilitie s violations corre cte d within 60
days of notice 173 220 225 227
# complaints received from public 23 26 30 30
# complaints verified and found to be illicit discharge 27 16 15 15
# illicit discharges found during routine detection 34 4 5 5
# enforcement vi si ts made 57 26 30 30
# NOVs issued 27 18 15 15
# com plaint calls 113 156 200 200
# calls responded to within 24 hours 108 142 175 175
# complaints resolved in 14 days 76 128 125 125
# trai ni ng cl asses hel d for engi neers 2 1 0 1
# co-sponsored training events offered to the
development community 1 2 2 1
# co-permi ttee trai ni ng events hel d 0 0 1 1
Objective 2(b): To ensure existing stormwater management facilities are functioning as designed
Objective 2(c): To e lim inate re porte d illicit discharge s from the county's MS4
Objective 3(a): To respond in a timely and effective manner to citizen concerns and complaints
Program Goal 3: To provide a prominent level of customer service and communication to the public on water quality issues
Objective 3(b): To maintain open communication and education to the development community
Land Development - continued
County of Greenville Budget Document
Fiscal Years 2014 and 2015
155
Actual Projected Target Target
Performance Indicators 2012 2013 2014 2015
# contacts (stormwater/drainage/stream bank) 1,400 1,400 1,400 1,400
# projects 8 9 12 12
# contacts (water and sediment problems) 350 350 350 350
# acres of conservati on pl ans wri tten 1,140 1,300 1,100 1,100
# acres for cropland with conservation applied to
improve water quality 551 1,050 500 500
# acres for grazing and forestland with conservation
applied to project and improve the resource base 1,676 400 1,000 1,000
# EQIP contracts 7 15 15 15
# watershed dams 9 9 9 9
# displays at public events 5 10 10 10
# teacher workshops 7 6 5 5
# storm drains marked 1,000 1,000 1,000 1,000
# school programs 30 46 25 25
# civic organization and homeowners' association
presentations 8 11 10 10
Objective 2(a): To organize and initiate community awareness programs
Objective 1(b): To work with the agricultural community and conservation groups on the importance of stormwater
management, water quality and conservation
Program Goal 1: To respond in a timely and effective manner to citizen requests for assistance.
Objective 1(a): To provide technical and financial support to the urban community to conserve and improve natural
resources.
Program Goal 2: To educate the community on all facets of soil and water conservation and stormwater management
FY2012 FY2012 FY2013 FY2013 FY2014 FY2015 TOTAL
SOIL AND WATER BUDGET ACTUAL BUDGET ACTUAL BUDGET BUDGET BUDGET
PERSONNEL SERVICES 228,582$ 227,866$ 240,387$ 250,246$ 277,929$ 286,744$ 564,673$
OPERATING EXPENSES 144,008 47,045 246,131 147,585 184,308 184,308 368,616
CONTRACTUAL CHARGES - - - - - - -
CAPITAL OUTLAY - - - - - - -
TOTALS 372,590$ 274,911$ 486,518$ 397,831$ 462,237$ 471,052$ 933,289$
POSITION SUMMARY 4.00 4.00 4.00 4.00 4.00 4.00
FTE SUMMARY 4.00 4.00 4.00 4.00 4.00 4.00
FY2013 actual expenditures are unaudited as of the printing date of this document.
SOIL AND WATER
Description
Services of the Soil and Water Division include providing technical assistance to landowners who have soil
erosion and water quantity and water quality problems. In addition, the Conservation district also carries out an
education program for all ages.
Financial Data
The biennium budget for Soil and Water for FY2014 and FY2015 is $933,289, which is 8.63% more than the
previous biennium budget. This increase is due to the inclusion of salary and benefit adjustments to personnel
services. The number of full-time equivalent positions is 4.00 for both years of the biennium .
Goals and Performance Measures
Supports Long-Term Goal(s): II-Infrastructure
County of Greenville Budget Document
Fiscal Years 2014 and 2015
156
Soil and Water- continued
Accomplishments and Other Activities
The Soil and Water Division inspected, repaired, and improved all nine watershed dams over a two -year phased
effort to ensure continued safety for downstream landowners and county roads. Several conservation programs
were developed and delivered to school classes and informal education settings. A week -long environmental
education workshop was provided for teachers in the summer. The Division worked with local groups to
promote storm drain marking volunteer program. They also distributed 100 oil drain recycling pan and
educational literature to citizens. During FY2014/FY2015, Soil and Water will strive to meet NPDES permit
requirements for public education. They plan to work toward increasing conservation awareness through
enhanced educational programs. In addition, the Division will expand the use of soil erosion control methods
through education and engineered solutions; provide maintenance of nine watershed dams; and administer the
319 grant awarded for septic tank repair/replacement in the Middle Saluda Watershed.
Source: Greenville County website. First collected Oct 13, 2026.