County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 111 COUNTY OF GREENVILLE CAPITAL PROJECTS Capital projects are submitted and approved through the multi-year Capital Improvement Planning process. This section of the document provides information on the multi-year capital improvement program, the current program status, a summary of capital projects and a copy of the Capital Improvement Policies. CAPITAL IMPROVEMENT PROGRAM The County of Greenville’s Capital Improvement Program is designed to identify major, infrequent and nonrecurring projects, which should be financed over a period of years. Greenville County has selected a programming period of 5 years. The development of a Capital Improvement Plan (CIP) involves a comprehensive evaluation of project planning, justification, coordination needs, priorities and relationship to budgeting policies. Therefore, the capital improvement budget is considered with budget decisions. Capital improvement programming is a continuous process involving yearly adjustments. The CIP includes capital projects recommended for fiscal years 2004 through 2008. Each fiscal year’s capital budget is submitted in conjunction with its respective operating budget. The CIP multi-year plan includes projects for which funding is currently available and for which future funding is reasonably assured. CAPITAL IMPROVEMENT PLANNING PROCESS Shown below is a graphic depiction of the process followed for capital improvement planning. July – December 2002 January – June 2003 Departmental program plans prepared and capital projects submitted to CIP team. July - November CIP Team Review Requests December County Departments prepare CIP requests by October 30 Budget/Planning Staff compile project information By December31 CIP Team reviews, prioritizes and recommends capital program January -April County Council adopts CIP and capital budget May - June 5-Year CIP and Capital Needs Assessment Developed by January 15 County Administrator’s Recommended Budget County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 112 CURRENT PROGRAM STATUS The FY2004-2008 Capital Improvement Program totals $106.783 million for projects in the areas of public safety, technological improvements, facilities, infrastructure, solid waste, and stormwater. For the current biennium budget, capital projects total $27.504 million for FY2004 and $37.539 million for FY2005. Below are graphic comparisons of budgeted capital projects by fund and by type. The following page provides a detailed listing of capital projects and financing summary. In the capital projects fund, infrastructure expenditures are by far the greatest percentage. The County’s Road Program comprises the majority of the infrastructure items. Capital projects funded by the County’s enterprise funds are specific to each respective fund. CAPITA L PRO JECTS BY FU N D Capital Projects Fund 82. 04% Stormwater Enterprise Fund 2. 55% Solid W aste Enterprise Fund 15. 41% CAPITAL PROJECTS BY TYPE Following is a graphic comparison of the capital improvements plan by type of improvements. The majority of improvements are for infrastructure improvements, which includes the County’s road program and drainage/stormwater issues. Another large area is public safety improvements, due to the expansion of the County’s Detention Center. $0 $10 $20 $30 $40 $50 $60 Millions Pu blic Safety Techn ology Faci lities Infrast ruct ure Solid Wast e Stormw ate r Ag encies TOTAL OPERATING OPERATING CAPITAL PROJECTS FUND CURRENT FY04 FY05 FY06 FY07 FY08 FUNDS IMPACT IMPACT FUNDING SOURCE APPROVED APPROVED PROPOSED PROPOSED PROPOSED FY2004-FY2008 FY2004 FY2005 COUNTY GOVERNMENT DEPARTMENTS Public Safety Projects Expansion of Criminal Records Division General Fund Transfer - $ - $ 0.279$ - $ - $ 0.279$ - $ - $ Forensics Technology General Fund Transfer - $ - $ 0.141$ - $ - $ 0.141$ - $ - $ Property and Evidence Processing Station General Fund Transfer - $ 0.150$ - $ - $ 0.150$ Detention Center Addition General Fund Transfer 6.000 $ 16.000 $ 1.430 $ - $ - $ 23.430$ - $ - $ TOTAL 6.000$ 16.000 $ 2.000 $ - $ - $ 24.000$ - $ - $ Technological Improvements Information Technology GF Transfer/Special Revenue 1.085 $ 0.700 $ 0.500 $ - $ - $ 2.285$ - $ - $ Ortho Photography/Land Base General Fund Transfer - $ 0.300$ 0.200 $ - $ - $ 0.500$ - $ - $ TOTAL 1.085$ 1.000 $ 0.700 $ - $ - $ 2.785$ - $ - $ Facilities HVAC Systems General Fund Transfer 0.074 $ - $ - $ - $ - $ 0.074$ (0.010) $ (0.010) $ Carpet Replacement General Fund Transfer 0.260 $ - $ - $ - $ 0.250$ 0.510 $ - $ - $ County Square Renovations General Fund Transfer 1.000 $ - $ - $ - $ - $ 1.000$ - $ - $ Parking Lot Renovations General Fund Transfer 0.088 $ 0.088 $ - $ - $ - $ 0.175$ - $ - $ Security Enhancements General Fund Transfer 0.200 $ 0.200 $ - $ - $ - $ 0.400$ - $ - $ Energy Projects (HVAC Controls) State ConserFund Program 0.298 $ - $ - $ - $ - $ 0.298$ (0.041) $ (0.041) $ TOTAL 1.919$ 0.288 $ - $ - $ 0.250$ 2.457 $ (0.051) $ (0.051) $ Infrastructure Water Lines General Fund Transfer 0.500 $ 0.500 $ - $ - $ - $ 1.000$ - $ 0 Road Program RMF/SSRB/GOBond 9.650 $ 11.101 $ 12.589 $ 11.600 $ 11.601 $ 56.541 $ - $ - $ TOTAL 10.150$ 11.601 $ 12.589 $ 11.600 $ 11.601 $ 57.541 $ - $ - $ COUNTY GOVERNMENT SUBTOTAL 19.154 $ 28.889 $ 15.289 $ 11.600 $ 11.851 $ 86.783 $ (0.051) $ (0.051) $ OUTSIDE AGENCIES The Matrix Business Park General Fund Transfer 0.500 $ 0.500 $ - $ - $ - $ 1.000$ - $ - $ AGENCIES SUBTOTAL 0.500$ 0.500 $ - $ - $ - $ 1.000$ - $ - $ CAPITAL PROJECTS FUND TOTAL 19.654 $ 29.389 $ 15.289 $ 11.600 $ 11.851 $ 87.783 $ (0.051) $ (0.051) $ SOLID WASTE ENTERPRISE FUND Solid Waste Landfill Solid Waste Fess/Millage 6.500 $ 6.800 $ 1.000 $ 1.000 $ 1.000 $ 16.300 $ - $ - $ SOLID WASTE ENTERPRISE FUND TOTAL 6.500 $ 6.800 $ 1.000 $ 1.000 $ 1.000 $ 16.300 $ - $ - $ STORMWATER ENTERPRISE FUND Stormwater Task Force Projects Stormwater Fee 1.350 $ 1.350 $ - $ - $ - $ 2.700$ - $ - $ STORMWATER ENTERPRISE FUND TOTAL 1.350 $ 1.350 $ - $ - $ - $ 2.700$ - $ - $ TOTAL FOR ALL CAPITAL PROJECTS 27.504 $ 37.539 $ 16.289 $ 12.600 $ 12.851 $ 106.783 $ (0.051) $ (0.051) $ COUNTY OF GREENVILLE COMPREHENSIVE CAPITAL IMPROVEMENT PROGRAM FINANCING SUMMARY (in Millions) County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 113 County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 114 RELATIONSHIP BETWEEN OPERATING AND CAPITAL BUDGETS Fiscal Year 2004 The chart below shows the relationship between the operating budget and capital expenditures for FY2004. Capital expenditures of $29.802 million include capital projects of $27.504 million. The impact on the $112.838 million operating budget is $2.799 million. This amount includes $2.588 million in debt service for capital projects approved in prior years, $224,614 in debt service for capital projects in FY2004, $38,000 for loan payment for State ConserFund loan, and $51,000 in estimated savings from operations related to new projects. The remaining $21.857 million for “pay-as-you-go” projects will come from fund balances in each of the respective funds and/or special revenue. Capital Budget 16. 23% Operating Budget 83. 77% Operating Impact $2.799 million for FY2004 Debt Service $2.850 million (Principal and Interest) Operations and Maintenance ($.051) million Operating Budget $24.488 $112.838 million million Capital Budget $29.802 million “Pay-as-you-go” - $21.587 million Fiscal Year 2005 The chart below shows the relationship between the operating budget and capital expenditures for FY2005. Capital expenditures of $38.630 million include capital projects of $37.539 million. The impact on the $121.752 million operating budget is $3.032 million. That amount includes $3.045 million in debt service for capital projects approved in prior years, $38,000 for loan payment of State ConserFund loan, and $51,000 in estimated savings for operations related to capital projects. The remaining $37.539 million for “pay- as-you-go” projects will come from general fund balance and/or special revenue. Capital Budget 24. 09%Operating Budget 75. 91% Operating Impact $3.032 million for FY2005 Debt Service $3.084 million (Principal and Interest) Operations and Maintenance ($.051) million Operating Budget $40.571 $150.267 million million Capital Budget $44.721 million “Pay-as-you-go” - $37.539 million County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 115 OPERATING IMPACTS A project might have an operating budget impact if the project includes the need for additional staff, maintenance, or daily operational costs. The amount of operating budget impact for each project is referred to in the following terms: OPERATING IMPACT DESCRIPTION Positive The project will either generate some revenue to offset expenses or reduce operating costs. No Impact The project will cause no change in operating costs Negligible The impact will be very small; it will generate less than $10,000 per year in increased operating expenditures. Slight The impact will be between $10,001 and $50,000 in increased operating expenditures. Moderate The impact will be between $50,001 and $100,000 in increased operating expenditures. High The impact will increase operating expenditures $100,001 or more. FUNDING SOURCES The Capital Improvement Program utilizes a variety of funding sources to fund capital projects. These sources include: transfers from the County’s general operating fund, general obligation bonds, special revenue, special source revenue bonds via the County’s Infrastructure Bank, pay- as-you-go basis either through ad valorem revenues or fees, and enterprise fund revenue. The chart below provides a description of funding sources. FUNDING SOURCE DESCRIPTION General Fund Transfer A major source of smaller capital projects is transfers from the County’s general operating fund. General Obligation Bonds General Obligation Bonds are used to finance a variety of public projects. Article X, Section 14, of the constitution of the State of South Carolina, 1895, as amended, provides that counties shall have the power to incur bonded indebtedness in such a manner and upon such terms and conditions as the General Assembly shall prescribe by general law. General obligation debt may be incurred only for public and corporate purpose in an amount not exceeding 8% of the assessed value of all taxable property of each county. Special Revenue One source utilized in the current CIP program is special revenue received from the sale of Grady Hipp Nursing Home and Greenville Retirement Center. Special Revenue Bonds The South Carolina Code of Laws, Section 4-1-175 and 4-29-68 provides that counties can issue Special Source Revenue Bonds for the purpose of building or acquiring infrastructure necessary to continue the economic development of a county. The portion of the CIP which provides for the building or acquiring of infrastructure necessary to continue the economic development of the County is included in the Infrastructure Bank and funded through Special Source Revenue Bonds. The County has pledged the County portion of the revenue stream from the multi-county parks, which includes fee-in-lieu-of-taxes (FILOT) revenues. Pay-as-you-go Basis Another source utilized in the CIP is the pay-as-you-go basis either through ad valorem revenues or fees. The CIP utilizes a road maintenance fee of $15 to fund a portion of the road program. State ConserFund Program This program provides the capability for SC counties to partner with the State to borrow money with a low interest rate for the purpose of funding energy related projects with demonstrated operational savings. Enterprise Fund Revenue For the County’s two enterprise funds, Solid Waste and Stormwater, improvements are funded through each fund’s respective revenue. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 116 CAPITAL IMPROVEMENT PROJECTS SUMMARY CAPITAL PROJECTS FUND The Capital Projects Fund is used to account for financial resources to be used for the acquisition or construction of major capital projects, other than those financed by proprietary funds. The FY2004-FY2008 Capital Improvement Program includes a budget of $105.783 million for various capital projects in the areas of public safety, technological improvements, facility improvements, and infrastructure improvements. Each project is discussed in detail on the following pages. PUBLIC SAFETY PROJECTS $24,000,000 A total of $24.0 million is included in the Capital Improvement Program to fund the construction, expansion, and renovation of law enforcement and public safety facilities. These projects include the construction of an additional inmate-housing pod for the Detention Center and renovation of law enforcement support areas. EXPANSION OF CRIMINAL RECORDS DIVISION No Impact on Operating Budget PROJECT NAME: Expansion of Criminal Records LOCATION: 20 McGee Street PROJECT DESCRIPTION The Criminal Records unit currently manages all criminal records generated by the Greenville County Sheriff’s Office, the Greenville Police Department, EMS records and related billing processes and all property seized by the Sheriff’s Office and Greenville Police Department. Record storage space and data entry space for clerks has not increased since 1976. Currently, during a typical month, approximately 8,000+ reports are received ranging from a single page to large files containing multiple pages. This project involves the relocation of the Criminal Records function to the 1994 Detention facility and would allow the opportunity for some future growth. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROV ED PROPOSED PROPOSED PROPOSED Planning and Design 0.070 0.070 Construction 0 .209 0.209 Total Expenditures - - 0.209 - - 0.279 General Fund Transfer 0.279 0.279 Total Funding - - 0.279 - - 0.279 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - CAPITAL FUNDING SCHEDULE (IN M ILLIONS) OPERATIN G BUDGET IM PACT (No Impact) FY2004- 20 08 C APITAL IMPROVEMENT PROGRAM CAPITAL EXPENDITURE SCHEDULE (IN M ILLIO NS) IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The renovation of the Criminal Records area is budgeted in a capital projects fund and is being financed with a general fund transfer to capital projects in conjunction with the Detention Center addition project. No impact on the operating budget is anticipated. Benefits of this project include: custodial consolidation of all department records, adequate space for operations of the Division, and enhanced security for the Division. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 117 FORENSIC TECHNOLOGY No Impact on Operating Budget PROJECT NAME: Forensic Technology LOCATION: 20 McGee Street PROJECT DESCRIPTION This project involves the replacement of three Livescan 3000N workstations. The Livescan devices are biometric fingerprint imaging devices utilizing computer processing to capture, store, and transmit fingerprint data in FBI NIST format. This system provides an inkless method of obtaining fingerprints and then electronically transmits these images and data information to SLED for criminal history purposes. The system has been redesigned and now allows the ability to capture palm prints. Currently, palm prints requested on an individual must be obtained in ink, which is time consuming, messy and requires extra space for a fingerprint stand. The automatic capturing of palm prints would ensure that high quality impressions are obtained. The most important element of the devices is that it allows for the ability to search against stored data. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Purchase of Equipment 0.141 0.141 Total Expenditures - - 0.141 - - 0.141 General Fund Transfer 0.141 0.141 Total Funding - - 0.141 - - 0.141 Personnel Services - Operating Expenses - Contractual Services - Total Operating Costs - - - - - - CAPITAL FUNDIN G SCHEDULE (IN M ILLIO NS) OPERATIN G BUDGET IM PACT (No Impact) FY2004- 2008 C APITAL IMPROVEMENT PROGRAM CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The replacement of this forensic technology is budgeted in the capital projects fund and is being financed with a general fund transfer to capital projects in conjunction with the Detention Center addition project. No impact on the operating budget is anticipated. This project will provide for the replacement of aged equipment and allow for faster processing time by reducing errors and time involved in capturing fingerprint and palm print information. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 118 PROPERTY AND EVIDENCE PROCESSING STATION No Impact on Operating Budget PROJECT NAME: Property and Evidence Processing Station LOCATION: 20 McGee Street PROJECT DESCRIPTION The Property and Evidence function is a part of the Criminal Records Division. Property and Evidence stores all physical evidence seized/obtained by the Sheriff’s Office and the Greenville Police Department. This project involves the development of a processing station in the temporary morgue located in the parking lot of the Law Enforcement Center. This temporary facility can be modified to create a drying space with appropriate ventilation for harmful and annoying odors. Portions of the same facility can be modified and enhanced with security measures to store repulsive items of evidence. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Construction 0.150 0.150 Total Expenditures - - 0.150 - - 0.150 General Fund Transfer 0.150 0.150 Total Funding - - 0.150 - - 0.150 Personnel Services - Operating Expenses - Contractual Services - Total Operating Costs - - - - - - FY2004- 2008 C APITAL IMPROVEMENT PROGRAM CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDIN G SCHEDULE (IN M ILLIO NS) OPERATIN G BUDGET IM PACT (No Impact) IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The creation of a property and evidence processing station for biohazard contaminated evidence is budgeted in the capital projects fund and is being financed with a general fund transfer to capital projects in conjunction with the Detention Center addition project. No impact on the operating budget is anticipated. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 119 DETENTION CENTER ADDITION Impact on Operating Budget – High >$100,001 PROJECT NAME: Detention Center Addition LOCATION: 20 McGee Street PROJECT DESCRIPTION This project involves the construction of a separate multiple custody building located adjacent to the current Detention Center. This project would increase the capacity of the facility to 1591 rated beds, an increase of 672 beds. The current facility is operating at 125% of its rated bed capacity for general population adult inmates. This addition will be accommodated in the form of new construction and minor renovations to the existing facility. FY 04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Planning and Design 1.678 1.678 Site Improvement 0.048 0.048 Construction 17.292 17. 29 2 Purchase of Equipment 1.497 1.497 Administration 0.50 0 0.500 Contingency 1.500 1.500 Ot her 0.915 0.915 Total Expenditures - 1.678 21.752 - - 23.430 General Fund Transfer 6.000 16.000 1.43 0 23. 43 0 Total Funding 6.000 16.000 1.430 - - 23.430 Personnel Services 0.226 0.831 1.391 2.448 Operating Expenses 0.349 0.524 0.549 1.421 Contractual Services 0.022 - - 0.022 Total Operating Costs - - 0.597 1.355 1.939 3.891 General Fund 0.597 1.355 1.939 3.891 Total Funding - - 0.597 1.355 1.939 3.891 CAPITAL FUNDIN G SCHEDULE (IN M ILLIO NS) OPERATING BUDGET IMPACT (High > $10 0,001) OPERATIN G FUNDIN G SCHEDULE (IN MILLIO NS) FY2004- 2008 C APITAL IMPROVEMENT PROGRAM CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The Detention Center addition is budgeted in a capital project fund and is being financed as a pay-as-you-go project with transfers from the general fund balance. The budget reflects the design and construction of the addition. The project has a high impact on the operating budget. Operating costs are expected to be $597,000 beginning in FY2006. This will provide for six full- time equivalent positions to begin the transition and phase-in of the addition. The full impact on the operating budget will be seen in FY2007, resulting in operational increases of $1,355,000 for salaries, utilities, and other related operational costs. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 120 TECHNOLOGICAL IMPROVEMENTS $2,785,000 A total of $2.785 million is programmed for technological improvements in the FY2004 – FY2008 Capital Improvement Program. These projects include the Greenville County Information Technology Plan and the Geographical Information System. These projects are described in more detail below. INFORMATION TECHNOLOGY No Impact on Operating Budget PROJECT NAME: Information Technology LOCATION: Various PROJECT DESCRIPTION This project entails implementing a comprehensive network system to provide connectivity between and among users, upgrading the County’s AS400 platform, installing network hardware and end-user query reporting, purchasing imaging systems and equipment for multiple county departments. The implementation of the Information Technology components will provide the County and its residents/customers with a more advanced, user friendly, citizen centered service organization through the addition, and replacement of equipment and software which will heighten Greenville County’s technological abilities, enhance existing service delivery, and provide for future growth in technology. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Purchase of Equipment 1.085 0.700 0.500 2.285 Total Expenditures 1.085 0.700 0.500 - - 2.285 General Fund Transfer 0.700 0.500 1.200 Special Revenue 1.085 - 1.085 Total Funding 1.085 0.700 0.500 - - 2.285 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - CAPITAL EXPENDITURE SCHEDULE (IN MILLIONS) CAPITAL FUNDING SCHEDULE ( IN MILLIONS) OPERATIN G BUDGET IM PACT (No Impact) FY2004- 2008 C APITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) Information technology improvements are budgeted in a capital project fund and financed with a transfer from special revenue in FY2004 and a general fund transfer in FY2005 and FY2006. The budget reflects the cost of purchasing the necessary equipment. No additional operating costs are expected to be incurred. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 121 GIS-ORTHO PHOTOGRAPHY/LAND BASE UPDATES No Impact on Operating Budget PROJECT NAME: GIS – Ortho Photography/Land Base Updates LOCATION: Various PROJECT DESCRIPTION This project involves the production of a standard series of maps with survey control, aerial photography, analytic triangulation and digital and hardcopy map production. These GIS land base updates began in FY2001 and provide a mechanism for annual, incremental updates of aerial photography, planimetric and topographic data within the county. Changes in planimetric data such as building footprints, ponds, lakes, wetlands, streams, rivers, dams, bridges, parks, airports, street center lines, edge of pavement lines, and parking lots as well as changes in topography due to development will be captured and incorporated into the GIS database. The digital orthophotography database will be updated providing a current, accurate picture what exists on the ground. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROV ED PROPOSED PROPOSED PROPOSED Purchase of Equipment 0.300 0.200 0.500 Total Expenditures - 0.300 0.20 0 - - 0.500 General Fund Transfer 0.300 0.200 0.500 Total Funding - 0.300 0.20 0 - - 0.500 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDING SCHEDULE (IN MILLIONS) OPERATIN G BUDGET IM PACT (No Impact) FY2004 -2008 CAPITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) Geographic information system improvements are budgeted in a capital project fund and financed with a general fund transfer. The budget reflects funding of $500,000 for the five-year CIP planning period for updating the GIS land base. No additional operating costs are expected to be incurred. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 122 FACILITY PROJECTS $2,457,000 A total of $2.457 million is programmed for facility construction and upgrades for County owned facilities. Projects include facility enhancements for County Square, including parking lot renovations, energy projects, and security enhancements. These projects are described in more detail below. UPGRADE OF HVAC SYSTEMS Impact on Operating Budget – Positive PROJECT NAME: HV/AC System Upgrades LOCATION: Health Department PROJECT DESCRIPTION This project involves upgrading the HVAC systems at the Health Department. This facility is currently being heated with 50+-year-old converted oil fired boilers (converted from coal to #2 fuel oil). These units are very inefficient and have borderline safety issues. New updated equipment with better energy rating will reduce energy cost, operational and maintenance costs. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROV ED PROPOSED PROPOSED PROPOSED Purchase of Equipment 0.074 0.074 Total Expenditures 0.074 - - - - 0.074 General Fund Transfer 0.074 0.074 Total Funding 0.074 - - - - 0.074 Personnel Services - Operating Expenses (0 .010) (0.010) (0. 011) (0.011) (0.011) (0.053) Contractual Services - Total O perating Costs (0 .010) (0.010) (0. 011 ) (0. 01 1) (0.011) (0.053) CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDING SCHEDULE (IN MILLIONS) OPERATIN G BUDGET IM PACT (Positive) FY2004-2008 CAPITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The replacement of the chiller at the Greenville County Health Department, one of Greenville County’s facilities, is budgeted in a capital project fund and financed with a general fund transfer. The budget reflects the cost of purchasing the equipment. Replacement of this outdated equipment will provide a positive impact on the operating budget. Savings of $10,000 within the operating budget for FY2004 and FY2005 are expected to be realized because of this project. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 123 CARPET REPLACEMENT No Impact on Operating Budget PROJECT NAME: Carpet Replacement LOCATION: County Square PROJECT DESCRIPTION This project involves the last phase of replacement of interior floor coverings of Greenville County Square, one of Greenville County’s facilities. Greenville County Square, which houses the County’s administrative and general government offices, is scheduled for carpet replacement in FY2004. This County facility has not replaced the carpet in 15 years. Standards for commercial facilities indicate replacement of floor coverings every 8-10 years. Carpet replacement recommendations are based on age and condition of carpet and facility usage. This project will allow the County to maintain appearance, safety standards and ensure product availability in the most economical manner. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROV ED PROPOSED PROPOSED PROPOSED Renovations 0.260 0.250 0.510 Total Expenditures 0.260 - - - 0.250 0.510 General Fund Transfer 0.260 0.250 0.510 Total Funding 0.260 - - - 0.250 0.510 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDING SCHEDULE (IN M ILLIONS) OPERATING BUDGET IM PACT ( No Impact) FY2004- 2008 CAPITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The replacement of the carpet at Greenville County Square is budgeted in a capital project fund and financed with a general fund transfer. The budget reflects the cost of this renovation. No additional operating costs are expected to be incurred. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 124 COUNTY SQUARE RENOVATIONS No Impact on Operating Budget PROJECT NAME: County Square Renovations LOCATION: County Square PROJECT DESCRIPTION Greenville County Square is a 350,000 square foot facility currently housing County offices and departments. Approximately 10% of the space is leased to state and federal agencies and other groups. The facility has been at the maximum occupancy level since 1996. In September 2001, Craig, Gaulden and Davis, Inc., conducted a feasibility study for the facility to determine how to more effectively utilize the building. An evaluation of the existing facility, conducted by means of a physical survey an departmental and management interviews, revealed that the functions and size of some departments make them unsuited for occupancy at County Square, and other departments have requirements and space needs that make their current locations within County Square less than ideal. A conceptual master plan was developed indicating recommendations for department relocation. A phasing sequence was provided showing the order in which these relocations and moves might occur with the least disruption to County operations. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Construction 1.000 1.000 Total Expenditures 1.000 - - - - 1.000 General Fund Transfer 1.00 0 1.000 Total Funding 1.000 - - - - 1.000 Personnel Services - Operating Expenses - Contractual Services - Total Operating Costs - - - - - - CAPITAL EXPENDITURE SCHEDULE ( IN M ILLIONS) CAPITAL FUNDING SCHEDULE ( IN M ILLIONS) OPERATIN G BUDGET IM PACT ( No Impact) FY2004- 2008 C APITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The renovation of County Square is budgeted in a capital project fund and financed with a general fund transfer. The budget reflects the cost of this renovation for Phase II. No additional operating costs are expected to be incurred. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 125 PARKING LOT RENOVATIONS No Impact on Operating Budget PROJECT NAME: Parking Lot Renovations LOCATIONS: County Square, Law Enforcement Center, Health Department PROJECT DESCRIPTION This project provides for renovations to the parking lots of the following County facilities: County Square, Law Enforcement Center, and the Health Department. The parking lots are 26 to 50 years old for these facilities and are experiencing fatigue and failure in many areas. Many years of traffic, tree roots, foot traffic, and renovation projects have contributed to these problems. Some injuries and claims for damage have been associated with damaged areas of parking lots. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Construction 0.088 0.088 0.175 Total Expenditures 0.08 8 0.088 - - - 0.175 General Fund Transfer 0.088 0.088 0.175 Total Funding 0.08 8 0.088 - - - 0.175 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - FY200 4-200 8 CAPITAL IMPROVEMENT PROGRAM CAPITAL EXPENDITURE SCHEDULE (IN MILLIONS) CAPITAL FUNDING SCHEDULE (IN MILLIONS) OPERATIN G BUDGET IM PACT (No Impact) IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The request for funding renovations to the parking lots of County facilities is appropriated over a two-year period for fiscal years 2004 and 2005. Funding ($87,500 for each fiscal year) is budgeted in a capital project fund and financed with a general fund transfer. No additional operating costs are expected to be incurred. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 126 SECURITY ENHANCEMENTS No Impact on Operating Budget PROJECT NAME: Security Enhancements LOCATION: County Square, Courthouse PROJECT DESCRIPTION Security audits have been conducted for two County facilities: County Square and the Courthouse (General Sessions Court). The audits were conducted by DLR Group/Enwright and Associates to determine the vulnerability to certain types of threats. These threats include but are not limited to bodily harm of employees and staff, theft, bombing, and biohazard attacks. The audits were intended to serve as a guideline for security enhancement. They do not contain recommendations for providing the maximum amount of security, but contain recommendations for enhancing security while keeping costs, convenience, and accessibility in mind. For both facilities, recommendations were made concerning perimeter security, entry security, and interior security. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Purchase of Eqiupment 0.200 0.200 0.400 Total Expenditures 0.20 0 0.200 - - - 0.400 General Fund Transfer 0.200 0.200 0.400 Total Funding 0.20 0 0.200 - - - 0.400 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - FY200 4-200 8 CAPITAL IMPROVEMENT PROGRAM CAPITAL EXPENDITURE SCHEDULE (IN MILLIONS) CAPITAL FUNDING SCHEDULE (IN MILLIONS) OPERATIN G BUDGET IM PACT (No Impact) IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) The request for funding security enhancements for County Square and the Courthouse is appropriated over a two-year period for fiscal years 2004 and 2005. Funding is budgeted in a capital project fund and financed with a general fund transfer. No additional operating costs are expected to be incurred. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 127 ENERGY PROJECTS (HV/AC CONTROLS) Impact on Operating Budget – Positive PROJECT NAME: Energy Projects (HVAC Controls) LOCATIONS: County Square, Law Enforcement Center PROJECT DESCRIPTION This project involves the implementation of energy-related projects. The project includes lighting retrofits for the Detention Center at the Law Enforcement Center facility. The project also includes upgrading the DDC Control System, installing pulse tap on main meter, ductwork/mechanical systems changes to correct hot spot/cold spot locations for the County Square facility. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Purchase of Eqiupment 0.298 0.298 Total Expenditures 0.298 - - - - 0.298 State ConserFund Program 0.298 0.29 8 Total Funding 0.298 - - - - 0.298 Personnel Services - Operating Expenses (0.041) (0.041) (0.042) (0.042) (0.042) (0.208) Contractual Services - Total O perating Costs (0.041) (0.041) (0.042) (0.042) (0.042) (0.208) FY2004- 2008 C APITAL IMPROVEMENT PROGRAM CAPITAL EXPENDITURE SCHEDULE (IN MILLIONS) CAPITAL FUNDING SCHEDULE (IN MILLIONS) OPERATIN G BUDGET IM PACT (No Impact) IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) Funding for these energy projects is included in the capital projects fund and is financed through the State ConserFund Program administered by the South Carolina Energy Office. Greenville County is a partner with the South Carolina Energy Office and thereby qualifies to borrow money at a low interest rate for energy projects. The State has allocated a total of $297,670 to complete these projects. Savings of $41,000 within the operating budget for FY2004 and FY2005 are expected to be realized because of this project. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 128 INFRASTRUCTURE IMPROVEMENTS $57,41,000 A total of $57.541 million is programmed for infrastructure improvements for the FY2004 – FY2008 Capital Improvement Program. These projects include the County’s road program, which is described in more detail below. ROAD PROGRAM No Impact on Operating Budget PROJECT NAME: Road Program LOCATION: Various PROJECT DESCRIPTION Road improvements include rehabilitation and/or reconstruction of “worst roads” first on a countywide basis. Planned projects are to be consistent with: (1) division and Council approved programs to reduce risk to public safety; (2) improvements on deteriorating road structures; and (3) Council approved Prescription for Progress Plan. The road program also includes bridge replacements, a traffic program, and a contribution for local municipality road programs. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROV ED PROPOSED PROPOSED PROPOSED Planning and Design 0.312 0.150 0.622 0.150 0.550 1.784 Site A cquisition 0.150 0.476 0.164 0.815 0.165 1.770 Paving Program 5.262 5.084 6.719 3.708 4.851 25.624 Road and Inspection 0.900 2.671 2.139 4.052 2.975 12.737 Bridge 0.62 6 0.320 0.520 0.450 0.610 2.526 Traffic 0.450 0.450 0.450 0.450 0.450 2.250 Local M unicipalities 0.700 0.700 0.700 0.700 0.700 3.500 Program Management 1.250 1.250 1.275 1.275 1.300 6.350 Total Expenditures 9.650 11.101 12. 589 11. 600 11 .601 56. 54 1 Special Source Revenue Bonds 8.000 - - - 8.000 General O bligation Bonds - - 5.000 10.250 - 15.250 Road Maintenance Fee 1.650 6.111 6.106 1.350 5.972 21.189 Other Sources/ Fund Balance 4.990 1.483 - 5.629 12.102 Total Funding 9.650 11.101 12. 589 11. 600 11 .601 56. 54 1 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDIN G SCHEDULE (IN M ILLIO NS) OPERATING BUDGET IMPACT (No Impact) FY20 04- 2008 C APITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) Funding for the road program is included in the capital projects fund and is financed through several instruments, such as Special Source Revenue Bonds, General Obligation Bonds, Road Maintenance Fee, and other sources. This project provides a direct benefit to citizens through road and bridge improvements. No additional impact on the operating budget is anticipated. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 129 WATERLINES No Impact on Operating Budget PROJECT NAME: Water Lines LOCATION: Various PROJECT DESCRIPTION This project involves the installation of city water lines for the southern portion of Greenville County. This project was included as an amendment by Council to the Capital Improvement Program. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROV ED PROPOSED PROPOSED PROPOSED Construction 0.500 0.500 - - - 1.000 Total Expenditures 0.500 0.500 - - - 1.000 General Fund Transfer 0.500 0.500 - - - 1.000 Total Funding 0.500 0.500 - - - 1.000 Personnel Services - Operating Expenses - Contractual Services - Total Operating Costs - - - - - - FY200 4-2008 CAPITAL IMPROVEMENT PROGRAM CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDING SCHEDULE ( IN M ILLIONS) OPERATIN G BUDGET IMPACT (No Impact) IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) Funding for this project is included in the capital projects fund and is financed through a general transfer to the capital projects fund. No additional impact on the operating budget is anticipated. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 130 AGENCY REQUESTS $1,000,000 Funds programmed for agency requests for the FY2004 – FY2008 Capital Improvement Program total $1.00 million. This includes one project for infrastructure improvements for the Matrix Business Park. THE MATRIX BUSINESS PARK No Impact on Operating Budget PROJECT NAME: Matrix Business Park LOCATION: Highway 25 PROJECT DESCRIPTION This project involves the development of approximately 1,800 acres adjacent to Route 25 and the Southern Connector into a mixed use business, industrial, technology park. Funding is provided by the County for the construction of the backbone roads. The remainder of funding is from other sources such as C funds, GRATs, Tea 2, etc. Funding for FY2002 – FY2005 will provide essential infrastructure on public roads in the Matrix Business Park. This includes road design and construction, utilities, stormwater/drainage, engineering and related activities. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Construction 0.500 0.500 1.000 Total Expenditures 0.50 0 0.50 0 - - - 1.000 General Fund Transfer 0.500 0.500 1.000 Total Funding 0.50 0 0.50 0 - - - 1.000 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDING SCHEDULE (IN M ILLIONS) OPERATIN G BUDGET IM PACT (No Impact) FY2004 -2008 C APITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) Funding for this project is included in the capital projects fund and is funded through a transfer from the General Fund. No additional impact on the operating budget is anticipated. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 131 CAPITAL IMPROVEMENTS PROJECTS SUMMARY PROPRIETARY FUNDS The County operates two enterprise funds: Solid Waste and Stormwater. Capital projects within those funds are accounted for in the appropriate proprietary enterprise fund. The FY2004- FY2008 Capital Improvement Program includes a budget of $19.000 million for various capital projects in the areas of solid waste and stormwater. Each project is discussed in detail on the following pages. SOLID WASTE ENTERPRISE FUND $16,300,000 The FY2004-FY2008 Capital Improvement Program includes a budget of $16.300 million for various capital projects in the solid waste enterprise fund, such as landfill improvements, acquisition of equipment. LANDFILL No Impact on Operating Budget PROJECT NAME: Landfill LOCATION: Anderson Ridge Road PROJECT DESCRIPTION The Enterprise Fund accounts for operations of the County’s waste disposal, recycling, and landfill. Revenues are derived from three major source categories: tipping fees, property taxes, and other. Capital projects for the landfill include continued cell construction at the Enoree Landfill to ensure waste disposal capacity, equipment replacement for efficient operations, and maintenance of inactive landfills. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Cell Construction 6.500 6.800 1.000 1.000 1.000 16.300 Equipment Replacement Inactive Landfill Postclosure Enoree Closure Landfill Permitting Landfill Development 0.600 Total Expenditures 6.50 0 6.800 1.000 1.000 1.000 16.300 Enterprise Fund Revenue 6.500 6.800 1.000 1.000 1.000 16. 300 Total Funding 6.50 0 6.800 1.000 1.000 1.000 16.300 Personnel Services - Operating Expenses - Contractual Services - Total O perating Costs - - - - - - CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDING SCHEDULE (IN M ILLIONS) OPERATIN G BUDGET IM PACT (No Impact) FY20 04- 20 08 C APITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) Funding for this project is included in the Solid Waste Enterprise Fund and is funded through revenue received for that fund. No additional impact on the operating budget is anticipated. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 132 STORMWATER ENTERPRISE FUND $2,700,000 The FY2004-FY2008 Capital Improvement Program includes a budget of $2.700 million for capital projects in the Stormwater Enterprise Fund. STORMWATER TASK FORCE PROJECTS No Impact on Operating Budget PROJECT NAME: Stormwater Task Force Projects LOCATION: Various PROJECT DESCRIPTION The Drainage Program includes funding for the “425” drainage projects. The following projects are anticipated to be completed during the five-year CIP: Fairmont and Clearfield (FY2004), Merrifield Park (FY2005). Funding is also included for Corp of Engineer flood studies. FY04 FY05 FY06 FY07 FY08 TOTAL APPROVED APPROVED PROPOSED PROPOSED PROPOSED Task Force Projects 0.600 0.600 - - - 1.200 Other Project 0.750 0.750 1.500 Total Expenditures 1.350 1.350 - - - 2.700 Enterprise Fund Revenue 1.350 1.350 - - - 2.700 Total Funding 1.350 1.350 - - - 2.700 Personnel Services - Operating Expenses - Contractual Services - Total Operating Costs - - - - - - CAPITAL EXPENDITURE SCHEDULE (IN M ILLIONS) CAPITAL FUNDING SCHEDULE (IN MILLIONS) OPERATING BUDGET IMPACT (No Impact) FY2004- 2008 CAPITAL IMPROVEMENT PROGRAM IMPACT ON OPERATING BUDGET (Discussion of recurring costs, savings that will be realized, benefit to the county and citizens) Funding for this project is included in the Stormwater Enterprise Fund and is funded through revenue received for that fund. No additional impact on the operating budget is anticipated. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 133 CAPITAL IMPROVEMENT POLICIES POLICY It is the policy of Greenville County government to develop, maintain, and revise when necessary, a continuing Capital Improvement Program. The goal of the program is to provide the infrastructure, i.e., streets, bridges, etc.; and physical plant required by the County to respond to needs and demands of the citizens in the manner that makes the best use of the limited monies available and is consistent with the various legal requirements and policies of the County. PURPOSE To set forth a process for capital improvement planning and programming, administering, and implementing, and reporting. DEFINITIONS Capital The County’s Capital Improvement Program is a five-year plan for the Improvement making of capital expenditures to be incurred each year to meet the Program County’s identified capital needs. It sets forth each project which the County is to undertake by fiscal year, and outlines those resources needed or estimated to finance the projected expenditures. Annual Capital The County’s annual capital budget is the designated year within the five- Budget year Capital Improvement Program approved by the County Council and is included as a part of the County’s annual adopted budget. Capital Project A capital project results in a permanent addition to the County’s assets. This is accomplished by acquisition of property, new construction, or rehabilitation, reconstruction, or renovation of an existing facility to a ‘like new’ condition which extends its useful life or increases its usefulness or capacity. Capital projects are large-scale endeavors in cost, in size, and in benefit to the county. They involve nonrecurring expenditures or capital outlays from a variety of specifically identified funding sources and do not duplicate maintenance activities in the operating budget. Capital projects typically have a service life in excess of the life of the bond issues used to finance them – typically from fifteen to twenty years. The purchase of vehicles is not considered a capital project. Unused Bond Unspent monies paid to the County by the purchaser or underwriter for an Proceeds issue of county bonds and interest earned on those monies, intended for use to finance the project or purpose for which the bonds were issued. Unspent Capital Unspent capital project funds are those resources other than bond Project Funds proceeds that have been received but are not spent in completing the capital project as planned. CAPITAL The continuing capital improvement planning and programming process is IMPROVEMENT designed to yield four products on an annual basis: an annual capital PLANNING & budget, a three-year funding program, a five-year CIP, and projects for PROGRAMMING future consideration. The planning and programming process requires the active participation of the following groups, entities, and agencies: citizens, County Council, Planning Commission, County Administrator’s Office, Finance Department and Office of Management and Budget, Public Services and Facilities Department, other departments of the county involved in providing physical facilities, and as appropriate, representatives from cities incorporated within Greenville County. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 134 Planning and The overall process of capital improvement planning and programming is Programming in two phases: Phase I – five-year capital program development for Process separate functional areas and Phase 2 – review of department proposals and development of countywide capital program update. As the annual operating budget is developed, the departments, the Office of Management and Budget and the County Administrator’s Office will examine the five- year capital program and its impact on the operating budget. Phase 1 Each line department of the County is responsible for biennually developing a departmental five-year capital improvement program. The building blocks of any CIP program are the individual projects. For each project requested, regardless of funding source, the departments are to provide the following information: community need for or purpose of the project, specific description or definition of project scope, priority ranking, fiscal impact, proposed financing schedule for each project, health and safety effects, environmental and social effects, distribution effects and general location, effects on inter-jurisdictional relationship, and advantages from relation to other capital project proposals. It is the responsibility of the other operating units, as named below, to take steps to ensure that all essential information required by the Departments is available to the Departments on a timely basis. Overall policy direction for Capital Improvement Programs is provided by the County Council and disseminated by the County Administrator’s Office. Administrative policies and procedures are implemented by the County Administrator. The Public Works Division, working with Purchasing, is responsible for providing five-year program project cost estimates and more refined budget cost estimates. The Public Buildings Division, working with Purchasing, is responsible for developing an estimate of the operating and maintenance budget impact of new, improved or expanded County facilities. It is the responsibility of the Planning Commission to convey information on the County’s Comprehensive Plan, including its policies and elements, facility plans, development and population trends, and annexations. The Office of Management and Budget is responsible for providing current financial and budget information, respectively, affecting the short and long-term funding of all capital projects. Phase 2 The first level of review of departmental proposals is accomplished simultaneously and independently by the Office of Management and Budget and the Planning Commission. The Planning Commission reviews the priority projects listing of the department and relates the projects and priorities to the Comprehensive Plan. The Office of Management and Budget works within the priorities proposed by the County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 135 departments and develops financing strategies and identifies funding limitations for the program proposals of the departments. The second level of the review utilizes a Capital Improvements Team, which is hereby established. The team is chaired by the Deputy County Administrator. The team shall include the Director of General Services, the Planning Commission and the OMB Manager. The team shall prepare a five- year CIP and submit to the County Administrator the proposal no later than November 15 of each year. The County Administrator shall propose a CIP to the County Council after having concluded an initial budgetary review and comprehensive plan consistency review with the Planning Commission. The County Administrator’s proposed five-year Capital Improvement Program is to be submitted to the County Council on or by the first council meeting in February of each year. CAPITAL The Capital Improvement Program administration and implementation IMPROVEMENT process is designed to efficiently transform plans and programs to usable PROGRAM public facilities. Specific objectives of the process are to implement ADMINISTRATION & projects at minimum cost and in minimum time. The process begins with IMPLEMENTATION the annual adoption of the capital budget. The administration and implementation process requires the active participation of the following groups, entities, and agencies: County Council, County Administrator’s Office, Office of Management and Budget, Planning Commission and the Engineering and Purchasing Division, and each department of the County involved in providing physical facilities, maintenance and services. Administration & The Capital Improvement Program administration and implementation Implementation process can be identified as having five phases: project initiation by Process department, project design, contract bidding, project construction, and project closeout. Responsibilities The following process description is necessarily general. It is intended to set forth the responsibilities, functions, and required internal procedures for administering and implementing capital projects. It should be recognized that there are other requirements and procedures that are directed by outside agencies. They are primarily associated with federal aid programs which have varying procedure requirements. This directive will govern unless outside agency requirements dictate otherwise and, in such instances, variations from this directive will be permitted only with County Administrator approval. Phase 1 Each Department is responsible for initiating those projects within its Project Initiation jurisdiction. The purpose of the initiation process is to verify that conditions existing at the time of approval still exist, that conditions of approval have been met, and that organizational readiness and project analysis has been reviewed under current conditions. In general, the order of project initiation will be consistent with the priority listing in the approved program. The following steps are required in this phase: The Department prepares scope of project, designated project director, and submits capital improvement project memorandum, with scope of project attached to initiate project. The following information should be attached to the initiation request: request f or a new p roje ct number, pr oje ct cost County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 136 estimate, synopsis of project funding, project cash flow, project calendar, capital budget authorization, and verification of any special (non-current revenue) funding. OMB verifies funding and advises the General Services Director who shall establish sufficient revenue and expenditure accounts, making transfers as appropriated, and forwards documents to the County Engineer for evaluation. Projects shall be expended from authorized funds, using most restrictive revenue first, as appropriated. Each reviewing department should process initiation forms within three working days of receipt. Architects and engineers evaluate scope and determine adequacy of budget estimate. Other requirements such as land acquisition also reviewed at this time. Capital Improvement Team either recommends project approval or refers back for additional work based on reports from initiating departments, OMB, and the Engineering staff. Approval by the County Administrator or designee is necessary to authorize proceeding with project. Phase 2 Unless specific exception is made in Phase 1 project initiation, the The Design Engineering staff is responsible for executing the design phase. The County may award professional services design and inspection contracts to outside architects and engineers for capital improvement projects. Throughout the design phase, consultants are required to maintain liaison with the appropriate County departments to assure functional acceptability and that operating and maintenance considerations are fully considered. The Engineering staff will ensure proper coordination in this regard. The project design will be subject to acceptance by the professional Engineering staff and the operating Department. The Building Maintenance Division will refine earlier estimates of the operating and maintenance budget impact of new or expanded County facilities during the design phase. The projected operating and maintenance budget impact shall include, but is not limited to, estimates of the increased costs for custodial and maintenance requirements, utilities, and staffing needs for a period of each of five consecutive fiscal years. Phase 3 Upon the completion of the design phase, reporting of deviations between Contract Bidding project budget and cost estimates resulting from design phase and authorization by the County Administrator to proceed, the Engineering staff will forward plans and specifications to the Director of General Services, Purchasing and the operating Department Director for processing of the construction contract. The following steps are required in the bidding process: issuance of notice of call for bids; conduct pre-bid conference with prospective bidders, where appropriate; authorize written agenda to contract documents as required; receipt and public opening of County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 137 bids; refer bids to Engineering and Purchasing staff and the operating department for evaluation and recommendation; verify contractor’s ability to obtain bond and insurance documents and compliance with purchase procedures; award of contract in accordance County purchasing policies and procedures; approval as to form by the County Attorney (public improvement contracts require the approval of County Council. Requests for Council action must be submitted to OMB 8-10 working days before the Council meeting. OMB is responsible for review and submittal to the County Administrator for inclusion on Council agenda no later than 5 working days prior to Council meeting.); execution of contract; approval by the County Administrator or designee; and notify contractor, County representative responsible for administering the contract, and operating Department that contract documents are completed. j Phase 4 Upon completion of Phase 3, the County representative designated in the Pro ect Consultation/ contract toadminister the work and perform inspection will: (1) conduct a Construction pre-construction conference (utilizing the checklist) to coordinate the construction with utility and traffic requirements and to provide Purchasing the opportunity to explain equal employment opportunity provisions, local and federal and the procedures for change orders and process payments; (2) establish a date for commencement of the work and issue a notice to proceed; (3) coordinate the inspection functions of the consultant; (4) actively pursue the progress of the work, performing timely inspections and processing progress payments as required; (4) where needed, recommend and initiate change orders to the contract; (5) authorize field change orders to the contract not to exceed $5,000 or 10% of the original contract price, whichever is smaller and make recommendations to Purchasing for change orders in excess of these amounts; (6) handle emergency field change orders; (7) conduct final inspection of the project with the contractor, consultant and operating department where appropriate; (8) ensure corrective action on all deficiencies; and (9) issue certificate of completion and process final payment documents. Phase 5 Upon completion of the construction phase and within 90 days of final Project Close-Out contractor payment, the initiating Department will enter final costs, completion dates, identification of unspent funds, and other pertinent information on projects close-out form, sign the certificate of completion and return the original form to the General Services Department. Departments shall be responsible to reconcile any differences between project closeout detail and the County’s financial and CIP tracking system. The General Services Department will verify the funding information, then shall close out appropriate project accounts within fifteen days of receipt of notice verifying the amount of unspent bond proceeds and/or unspent capital project funds. Phase 6 After project closeout, total revenues should equal total expenses. There Project Final should be no further charges to the project account. REVISIONS IN OMB will be responsible for the coordination of the preparation and CAPITAL PROGRAMS submission of reports, setting out revisions that are recommended, and AND CAPITAL the current status of the capital projects. All proposed capital project PROJECTS changes shall be submitted through OMB for the approval of the County Administrator. County of Greenville Operating and Capital Budget Fiscal Years 2004 and 2005 138 Departments shall endeavor to implement without change their approved capital program and the projects therein. However, it is recognized that, for a variety of reasons, changes are necessary and, therefore, procedures to accommodate changes are established herein. No capital project shall be undertaken unless it is included in the capital budget or is approved by County Council. No capital project shall be deleted from the capital budget unless approved by the Council or notice given to Council. In no case shall projects incur a funding deficit without approval of the County Council. The underlying principles governing the handling of proposed capital program and capital project changes are to ensure consistency with County Council policy direction, available budget capacity, and the achievement of the overall functional objectives of the Department, as embodied in the adopted CIP, and to ensure that changes are handled in a visible manner with all appropriate entities involved. All changes to capital programs and projects shall be reported to the County Council on a quarterly basis. PROJECT In October, January, April, and July, the OMB will assemble a Capital REPORTING Improvements Project Status Report for distribution to the Council through PROCEDURE the Quarterly Operating Report. Status of Previously Each October and November , the Departments are scheduled to brief the Approved or Carried Capital Improvements Team on the status of that Department’s then Forward Projects existing capital program bu dget and individual projects. This status briefing is especially useful in identifying those projects that have fallen behind schedule and, thus, may need to be included, although not originally planned, in a subsequent year’s budget. The presence of carried forward projects could place the County in the awkward position of having to use scarce budget capacity twice; once in the initial budget year and then again in the subsequent period. The result is a needless use of legal budget capacity and, therefore, carry forward projects are to be discouraged. Each department will monitor project implementation closely.

Source: Greenville County website. First collected Oct 13, 2026.