RecordWell Data

E-Packet 04.21.2026

Jasper County · Jasper County · meeting of Apr 21, 2026 · Agenda packets

Open the original document More from Jasper County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Lowcountry Pavers – Variance Request Page 1 of 6 Jasper County Planning and Building Services 358 Third Avenue Post Office Box 1659 Ridgeland, South Carolina 29936 Phone (843) 717-3650 Fax (843) 726-7707 Lisa Wagner, CFM Director of Planning and Building Services lwagner@jaspercountysc.gov Jasper County Board of Zoning Appeals Staff Report Meeting Date: April 21, 2026 Project: Variance Request from 1) Article 7:3, Table 1 – Setback Requirements; and 2) Article 12:8.2-3, Table 4 – Bufferyard Requirements Applicant: Lowcountry Paver, LLC Tax Map Numbers: 029-40-04-022 Submitted For: Action BACKGROUND. The applicant, Lowcountry Paver, LLC is seeking relief from Section 7:3, Table 1 – of the Jasper County Zoning Ordinance, Setback Requirements , to reduce the setbacks along the rear property line from 15 feet, varyingly, to a minimum of 1.1 feet. The applicant is also seeking relief from Section 12:8.2-3, Table 4 – of the Jasper County Zoning Ordinance, Bufferyard Requirements, to reduce the bufferyard requirements to allow an 8’ buffer masonry wall along the rear property line in lieu of vegetation and/or wooden fencing. The subject propert y is zoned Industrial Development and is located at 535 Stiney Road. The property consist of 9.93 acres and is identified by Jasper County Tax Map Number 029 -40-04-022. The property was developed in 1998 as Lowcountry Concrete and then expanded several years later to establish Lowcountry Pavers. State Law: Under the Local Comprehensive Planning Enabling Act of 1994 (“1994 Act” ), the Board of Zoning Appeals (“Board”) has the power to hear and decide appeals (requests) for variances when strict application of the zoning ordinance would result in “unnecessary hardship.” S.C. Code Ann. §6-29-800(A)(2). A variance allows the Board to modify an otherwise legitimate zoning restriction when, due to unusual conditions , the restrictions may be more burdensome than was intended. The variance must not impair the public purpose. To obtain a variance on the ground of “unnecessary hardship,” there must at least be proof that a particular property suffers a singular disadvantage through the operation of a zoning regulation. A claim of unnecessary hardship cannot be based on conditions created by the owner nor can one who purchases the property after the enactment of a zoning regulation complain that the nonconforming use would work a hardship upon him. Lowcountry Pavers – Variance Request Page 2 of 6 When deciding whether to grant or deny a variance, the Board has some discretion; however, the Board is not free to make whatever determination appeals to its sense of justice. Rather, the Board must apply the standards prescribed by the zoning ordinance and the 1994 Act. Courts will not uphold a decision of the Board to grant or deny a variance based on errors of law, fraud or lack of supporting evidence, or a board action that is arbitrary, unreasonable, discriminatory or an abuse of discretion. STANDARDS FOR GRANTING VARIANCES. The Board may grant a variance in an individual case of unnecessary hardship if the Board makes and explains in writing specific findings. S.C. Code Ann. §6-29-800(A)(2); Jasper County Code Section 3:3.1. The Jasper County Code Section 3:3.1 establishes that the Board “may authorize upon written appeal in specific cases such variance from the terms of (the Zoning Ordinance) as will not be contrary to the public interest where the variance meets all of the following criteria: 1. Extraordinary conditions . There are extraordinary conditions pertaining to the particular piece of property; 2. Other property . These conditions do not generally apply to other property in the vicinity; 3. Utilization. Because of these conditions, the application of the ordinance to the particular piece of property would effectively prohibit or unreasonably restrict the utilization of the property; and 4. Detriment. The authorization of a variance will not be of substantial detriment to adjacent property or to the public good , and the character of the district will not be harmed by the granting of the variance. ANALYSIS. The following are the zoning standards for which relief is being sought: Article 7:3, Table 1 Yard and Setback Requirements: Minimum Yard & Building Setback (feet) Multifamily, Single-Family & Non-Residential Uses R RRL RP RC CC GC ID RE MB Front Major Street (Multi-Lane) 60 60 60 60 60 60 60 200 60 Major Street (Two-lane) 35 35 45 45 35 35 45 200 45 Minor Street 25 15 25 25 25 25 25 150 25 Side Non- Residential 10 N/A 25 50 5 5 10 100 10 Rear Non- Residential 40 N/A 50 150 10 10 15 100 15 Lowcountry Pavers – Variance Request Page 3 of 6 The table above lists the minim um required lot widths and setbacks based on the Zoning District , which in this case is Industrial Development. The setbacks applicable to this particular site are highlighted in the table above. Article 12:8 Screening and Buffering Requirements; Section 12:8.2-3 Requirements: Bufferyards shall be required for proposed new uses or substantially expanded uses (over 50 percent gross floor area) in accord with Table 4 below: Table 4 Bufferyard Requirements Existing Use Proposed Use Agricultural Single-Family Dwelling All Other Residential Uses Office / Institutional Commercial/ Non-Effluent Industry Effluent Producing Industry Street Office / Institutional 0 2 1 0 0 0 1 Multi-Family 0 2 0 1 2 3 1 Low Impact Commercial 0 2 1 0 0 0 1 Commercial 1 3 2 0 0 0 1 Non-effluent Producing Industry 2 4 3 2 0 0 1 Effluent Producing Industry 3 6 5 3 2 0 3 Mining and Mine Operation 3 7A 7A 5 2 1 7B Manufacturing Use in IPOD* 3 6* 5 3 2 0 3 Table 4 above requires a bufferyard type 6 because there is a single-family dwelling, located adjacent to the rear property line. Additionally, there are two other properties located adjacent to the rear property line. Both of these pr operties are undeveloped and are zoned Residential and Rural Preservation. Type 6 bufferyard allows for a variety of ways to meet the bufferyard requirements, which are: • A type 6A bufferyard requires a 50’ wide buffer with 8’ fence & 45 trees & 80 shrubs or a 8’ fence & 30 trees & 120 shrubs. • A type 6B bufferyard requires a 25’ wide buffer fence with a 6’ masonry wall & 25 trees or shrubs. The applicant is requesting that the bufferyard requirement be reduced to allow 8’ masonry wall, which is a type 5C bufferyard with a 5’ wide buffer. The bufferyard illustrations from Article 12:8 of the Jasper County Zoning Ordinance are shown on the next page. Lowcountry Pavers – Variance Request Page 4 of 6 Lowcountry Pavers – Variance Request Page 5 of 6 Discussion of the Standards for Granting a Variance for the Setback Requirements (Article 7:3, Table 1) The following information was provided by the applicant: 1. Extraordinary Conditions. Applicant Response: (1) There is no effective through route to paved roads except to Stiney Road, necessitating circulation of large trucks and trailers within the property, looping in from and out to Stiney Road; (2) Thus, special features like the settlement basin and its appurtenances and accesses have to be located far back, to the west, on the property to allow concrete trucks to be washed out, loaded, and associated vehicle movements and circulation for them and other trucks and trailers, while maintaining space for other essential facilities, operations, and parking. 2. Other Property . Applicant Response: All other properties in the vicinity are residential, not industrial, in their uses, so this property’s site and conditions are different from other properties in the vicinity and do not generally apply to other properties in the vicinity, which have different functional and circulation requirements. 3. Utilization: Applicant Response: Application of the 15’ setback per Table 1 of Article 7 of the Jasper County Development Ordinance would prohibit, or unreasonably restrict at best, the utilization of the property for its uses. 4. Detriment: Applicant Response: With the requested variance for buffer the setback variance requested along the rear (westerly) border of the property will have minimal visual or other impact on adjacent properties and, therefore, will not have a substantially detrimental impact on those adjacent properties. Because only a few adjacent properties are within sight of the operations and uses on the property, many of which operations and uses have extant on the property since the latter 1990’s, there is no substantially detrimental impact on the public good. Moreover, this settlement basin is self-contained with recirculating water, with no effluent discharge which could have any impact on the adjacent properties or public good. Discussion of the Standards for Granting a Variance for the Buffer Requirement (Article 12:8.2-3, Table 4) The following information was provided by the applicant: 1. Extraordinary Conditions . Applicant Response: (1) There is no effective through route to paved roads except to Stiney Road, necessitating circulation of large trucks and trailers within the property, looping in from and out to Stiney Road; (2) Thus, special features like the settlement basin and its appurtenances and accesses have to be located far back, to the west, on the property to allow concrete trucks to be washed out, loaded, and associated vehicle movements and circulation for them and other trucks and trailers, while maintaining space for other essential facilities, operations, and parking. 2. Other Property . Applicant Response: All other properties in the vicinity are residential, not industrial, in their uses, so this property’s site and conditions are different from other properties in the vicinity and do not generally apply to other properties in the vicinity, which have different functional and circulation requirements. 3. Utilization. Applicant Response: Application of the Type 4 (Non -Effluent Producing Industry), from Table 4 of Section 12:8.2 -3 of the Jasper County Development Lowcountry Pavers – Variance Request Page 6 of 6 Ordinance would prohibit, or unreasonably restrict at best, the utilization of the property for its uses. Applicant seeks approval of a variance for a Type 5C buffer (8’ masonry wall) in lieu of the Type 4 or Type 6 Buffers (vegetation with or without a non-masonry fence). 4. Detriment. Applicant Response: The type 5C buffer, if granted by this variance request, provides even more visual and other protections for the adjacent properties and the public good. Also, with the requested variance for buffer, the setback variance requested along the rear (westerly) border of the property will minimal visual or other impact on adjacent properties. Because only a few adjacent properties are within sight of the operations and uses on the property, many of which operations and uses have been extant on the property since the latter 1990’s, there is no substantially detrimental impact on the public good. Moreover, this settlement basin is self -contained with recirculating water, with no effluent discharge which could have any impact on the adjacent properties or the public good. STAFF RECOMMENDATION Variance for Setbacks . If the Board were to consider granting a variance to reduce the setback requirement along the rear property line, the only area that cannot meet the setbacks is where the settlement basin is located. A variance is not needed anywhere else along the rear property line in accordance with the exhibit prepared on behalf of the applicant by Alliance Consulting Engineers, titled “Buffer/Setback Variance Request Operations at 535 Stiney Road Jasper County, South Carolina” and numbered 4. Variance for Buffer . If the Board were to consider granting a variance to reduce the buffer requirements along the rear property line, staff would recommend requiring a 10’ decorative wall that includes architectural features rather than an industrial concrete block wall. ATTACHMENTS. 1. Application 2. Exhibits provided by the applicant • Exhibit 1 – Recorded Boundary Survey • Exhibit 2 – Unrecorded Plat “As -Built Land Survey” dated 10/31/2025 by Coastal Surveying • Exhibit 3 – Site Plan of operations titled “Buffer/Setback Variance Request” prepared by Alliance • Exhibit 4 – Site Plan of operations titled “Buffer/Setback Variance Request” focused on operations at rear property line • Exhibit 5 – Engineered Plans for the settlement pond • Exhibit 6 – Section 7:3-Table 1 of the Jasper Co. Zoning Ordinance • Exhibit 7A and 7B – Section 12:8.2 Bufferyards 3. Jasper County Aerial Map 4. Public Comment Letter and Pictures submitted by Diane Riley including pictures

Source: Jasper County website. First collected Oct 13, 2026.