RecordWell Data

Town Council Workshop Meeting — Agenda Packet

Town of Hilton Head Island · Beaufort County · Town Council · meeting of Jul 28, 2026 · Agenda packets

Open the original document More from Town of Hilton Head Island

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Town of Hilton Head Island Town Council Workshop Meeting Tuesday, July 28, 2026, 3:00 PM 1 Town Center Court, Hilton Head Island, SC Benjamin M. Racusin Council Chambers The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County Channel, and Spectrum Channel 1304. 1. Call to Order 2. Adoption of the Agenda 3. Workshop Discussion a. Review and Discussion of Proposed William Hilton Parkway Gateway Corridor Master Plan 4. Public Comment - Non Agenda Items 5. Adjournment FOIA Compliance: Public notification of this workshop has been published, posted, and distributed in compliance with the South Carolina Freedom of Information Act and the requirements of the Town of Hilton Head Island. In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities. Auditory accommodations are available. Any person requiring further accommodation should contact the Town of Hilton Head Island ADA Coordinator as soon as possible but no later than 48 hours before the scheduled event. Municipal Association of South Carolina (MASC) Civility Pledge: “I pledge to build a stronger and more prosperous community by advocating for civil engagement, respecting others and their viewpoints, and finding solutions for the betterment of my city or town.” Page 1 of 93 Stephen G. Riley Municipal Complex One Town Center Court  Hilton Head Island  South Carolina  29928 www.hiltonheadislandsc.gov TOWN OF HILTON HEAD ISLAND Town Council TO: Town Council FROM: Shawn Gillen, Assistant Town Manager VIA: Don D’Adam, Public Projects Director Jeff Netzinger, Engineering Director CC: Marc Orlando, ICMA-CM, Town Manager Shawn Leininger, AICP, Deputy Town Manager DATE: July 28, 2026 SUBJECT: William Hilton Parkway Gateway Corridor Master Plan Workshop PURPOSE: Town Council review updates to the proposed William Hilton Parkway Gateway Corridor Master Plan. BACKGROUND: Since Town Council’s March 4, 2025, approval of the joint resolution with Beaufort County regarding the project scope and funding strategy (Attachment 1), Town staff ha ve advanced a proposed draft William Hilton Parkway Gateway Corridor Master Plan (Attachment 2). This work builds upon prior Town Council direction and reflects regional alignment, incorporates stakeholder input, and integrates the community values previously established by Town Council. The proposed plan prioritizes safety, mobility, community compatibility, and gateway aesthetics, while maintaining alignment with regional infrastructure investments. Town Council reviewed the draft William Hilton Parkway Gateway Corridor Master Plan at a workshop on April 28, 2026. Based on Town Council direction, Town staff have further refined the draft plan. At the July 28, 2026, Workshop the following items will be reviewed: 1. Summary of the Refinements to the Master Plan Since We Last Met 2. Project Extent Bridge Project Overview 3. Project Objective, Guiding Principles, and Influences 4. Summary of Improvements 5. Jenkins Island Improvements 6. Stoney Neighborhood Improvements Page 2 of 93 Page 2 of 2 a. Squire Pope Road / Chamberlin Drive Intersection b. Wild Horse Road / Spanish Wells Road Intersection 7. Old Wild Horse Corridor Improvements 8. Analysis a. Performance Matrix b. Implementation Sequence c. Additional Requests for SCDOT/Beaufort County d. Projects Descriptions / Cost Estimates e. Project Funding f. Project Timeline g. Additional Transportation System Improvement Projects These refinements reflect prior Town Council guidance, incorporate regional coordination and stakeholder input, and uphold the community values previously established by Town Council. The proposed William Hilton Parkway Gateway Corridor Master Plan integrates multimodal performance, economic impact, and environmental stewardship and creates a successful corridor that delivers efficient, safe, and multimodal connections between primary economic centers, while supporting the movement of people and freight. NEXT STEPS: Based on the direction of Town Council, Town staff will finalize the William Hilton Parkway Gateway Corridor Master Plan for Town Council approval consideration at an upcoming meeting. ATTACHMENTS: 1. Adopted Joint Resolution of the Town of Hilton Head Island and Beaufort County to Redefine the US278 Corridor Project 2. Draft William Hilton Parkway Gateway Corridor Master Plan Page 3 of 93 RESOLUTION 2025/15 A JOINT RESOLUTION OF BEAUFORT COUNTY & TOWN OF HILTON HEAD ISLAND TO REDEFIN'E. THE US 278 CORRIDOR PROJECT (ALSO KNOWN AS THE WILLIAM HILTON PARKWAY GATEWAY CORRIDOR PROJECT) TO ALIGN WITH THE AVAILABLE FUNDING WHEREAS, the current proposed 278 Corridor Project (also known as the William Hilton Parkway Gateway Corridor Project includes a bridge with a multi-use pathway and roadway improvements spanning from Moss Creek Drive to Spanish Wells Road; and WHEREAS, any Funds expended from the 2018 Referendum as per the referendum will solely be expended within the originally project area from Moss Creek Drive to Squire Pope Road, and funds spent for improvements between Squire Pope Road and Spanish Wells Road will be sourced solely from Local Impact Fee Revenue; and WHEREAS, the current available funding for the Project totals $298.85 million, consisting of $101 million from Beaufort County (sales tax and impact fees), $3.35 million from the Town of Hilton Head Island donations), $74.5 million from the South Carolina Department of Transportation (SCDOT), and $120 million from the State Infrastructure Bank (SIB); and WHEREAS, in February 2024, SCDOT provided an updated Project cost estimate, increasing the projected Project cost from $305 million to $488 million; and WHEREAS, this updated Project cost estimate was in our following quarterly report to the SIB, and upon receipt, the SIB requested a meeting with the County to address the project status and funding shortfall; and WHEREAS, at a meeting on May 29, 2024, between SIB, SCDOT, state representatives, and Beaufort County, the County proposed a pro-rata cost-sharing arrangement between SIB, SCDOT, and the County to cover the $190 million Project funding shortfall; and WHEREAS, in a letter to SIB dated July 3, 2024, the County formally requested $90 million from SIB to match a $90 million contribution from the County, contingent upon voter approval of a proposed Transportation Sales Tax Referendum in November 2024; and WHEREAS, on November 5, 2024, the Transportation Sales Tax Referendum did not receive voter approval thereby rendering the proposed match unavailable; and WHEREAS, on November 7, 2024, SIB issued a letter to the County requesting a response within 15 days regarding the plan to address the $190M Project funding shortfall; and WHEREAS, at its November 12, 2024, County Council meeting, the Council voted not to allocate additional funds to the Project; and Attachment 1 Page 4 of 93 WHEREAS, in a letter to Beaufort County dated November 18, 2024, SCDOT reiterated the deteriorating condition of the eastbound Mackay Creek Bridge, stating that its current condition is rated a 4 out of 10, and emphasized that a decision on a viable project must be made by March 31, 2025, to proceed with construction by 2027; and WHEREAS, at the November 20, 2024, SIB meeting, an extension was granted to Beaufort County until March 31, 2025, for the County to provide a revised funding plan for the Project; and WHEREAS, on January .9, 2025, Senator Tom Davis, with support from the state delegation, presented a proposal to the Project to match available funding; and WHEREAS, SCDOT has provided six project options along with cost estimates for each option, including the proposal endorsed by Senator Tom Davis; and WHEREAS, only two of the six options, (excluding the standalone Mackay Creek Bridge replacement) fall within the available $298.85 million budget; and WHEREAS, a joint meeting of the Beaufort County Council and the Hilton Head Town, Council was held on February 12, 2025, to discuss the options for the Project presented by SCDOT and the funding for the Project. WHEREAS, in a February 28, 2025, letter from South Carolina Secretary of Transportation Justin Powell, to Senator Tom Davis, if the projected proceeds, SCDOT will make it a Project and is willing to include in the procurement documents and in the scoring of new proposals, a preference for alternatives that provide two way access, meaning one can exit from the New Bridge heading eastbound onto Pinckney Island as well as depart Pinckney island on to the New Bridge to head eastbound to Jenkins Island, rather than the current plan to provide access to Pinckney island solely from Jenkins Island, a copy of which is incorporated by reference and attached as Exhibit B. NOW THEREFORE, BE IT RESOLVED THAT THE COUNTY COUNCIL OF BEAUFORT COUNTY, SOUTH CAROLINA, AND THE TOWN COUNCIL OF THE TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA, hereby adopt arevised scope for the Project to align with the available The revised Project includes the following elements: Revised Project Scope: 1. * Demolition of the existing eastbound bridge over Mackay Creek, construction of a new bridge extending from the mainland to Jenkins Island and retaining the existing two lane eastbound bridge over Skull Creek and the two existing two lane westbound bridges over Mackay Creek and Skull Creek* Construction of the New Bridge will be a three-lane eastbound lifeline bridge without a pathway. 2. * Striping the New Bridge for two lanes, with only necessary road tieuins included. 3. Designing the New Bridge width to accommodate temporary four-lane use in the future if westbound bridge replacement is required. 4. * The New Bridge will be designed so that there is a preference to provide two-way access to and from Pinckney Island from the New Bridge over the use of the existing Skull Creek Page 5 of 93 bridge, either the eastbound or westbound lanes being repurposed for two-way access to Pinckney Island. * Construction of a Hog Island connector road/bridge to provide access to Cove,Blue Heron Point, and Hog Island, linking back to US 278 at the Windmill Harborintersection. * Retention and improvement of the Windmill Harbor signal with mast arms.The Town of Hilton Head Island and Beaufort County agree to work cooperatively on the following: i. Transfer the maintenance and repair responsibilities of the Windmill Harbor Signal to the Town of Hilton Head Island. Funding for mast arms and installation of adaptive technology consistent with that installed on existing Town of Hilton HeadIsland Signals will be eligible for the use of Reserve Funds if they remain at the end ofthe bridge project. it. Explore providing a bike/pedestrian lane on the new eastbound bridge structure, as partof the built third lane, until the third lane is needed for operations.ili. Request that SCDOT reduce the speed limit of the William Hilton Parkway Corridorto 40mph. \ *These project elements are in attached as Exhibit A. Funding Elements: Funding Source Amount (in millions)Current Project Funding (SIB, DOT, Local) $295.50M Additional SCDOT Funding (DOT, Local) $ 16.10 M to Date (DOT,_LocalL_ S 13.07 MTotal Available Funding $298.53M Planned Project Costs Amount (in millions)Revised Project Costs (SIB, DOT, Local) $257.70M Remaining Engineering Costs (DOT, Local) $ 15.00M Reserve Funds(Local) $ 14.33M PSD Relocation Funds (Local) $ 6.50M ,Stoney Historic Cornnnmity SafeatLProjectsJLocal) $ 5.00M Total Costs $298.53M Use of Local Funds: 1. Reserve Funds will cover potential project overruns. 2, The Project will fund the replacement of the 24" waterline up to the limits inState Act 36, plus the allocated $6.5 million in Local Funds Costs for the waterline relocation not covered by combination of State Act 36 and Local Funds will befunded using Reserve Funds as the top priority. 3. To address immediate safety concerns in the Stoney Historic Community, a minimum of$5.0 million in Local Funds will be set aside and reserved for a local road project, withfunds made available upon approval of the Project by the Federal HighwayAdministration, with the Town overseeing design and construction, prioritized as follows:i. Squire Pope intersection enhancements (pedestrian safety, turn movements, etc.)ii. Sidewalk enhancements Page 6 of 93 Adopted this 10th day of March 2025. ATTEST; ngaAw EMA Adopted this 4th day of March 2025. ATTEST: ' berly Gammon, Clerk to Council COUNTY COUNCIL OF BEAUFORT COUNTY Alice Howard, Chair HILTON HEAD ISLAND TOWN COUNCIL Page 7 of 93 Retain existing 2-lane Weskbound as-is / $13 \_ Retain 2-lane Westbound Page 8 of 93 EXHIBIT B Justin P. Powell Secretan/ of Transportation South Carolina 808-737-0874 I 803-7372038 Fax Department of Transportation February 28, 2025 The Honorable Tom Davis South Carolina Senate 203 Gressette Building Columbia, SC 29201 Dear Senator Davis: As you are aware, Beaufort County and the Town of Hilton Head Island are in discussions about revising the US-278 Bridge project into a smaller project focused on the eastbound approach from Bluffton onto Hilton Head Island. The South Carolina Department of Transportation (SCDOT) has developed an alternative to build a single span across Mackay Creek and Skull Creek. While designed forfuture capacity, the structure would be striped fortwo lanes and would tie into the existing once on Hilton Head Island. This approach would address SCDOT concerns about the US-278 eastbound bridge over Mackay Creek and advance a project that facilitates the long~term plan to reconstruct all four bridges onto the island, Consistent with the original proposal for the full bridge, the revised plan would aim to reduce the environmental impacts to the Pinckney Island National Wildlife Refuge by not having the structure touch down on the island. Given the budgetary constraints of funds available from Beaufort County, the State Infrastructure Bank, and SCDOT, the current plan has public access to Pinckney Island solely from Hilton Head Island. Full access to Bluffton from Pinckney Island would be established in the future when the westbound structures are replaced. I recognize the concern about vehicles traveling from Bluffton to Pinckney Island will now be required to travel to Hilton Head Island first. To that end, I want to offerthe following: 1) It the revised project proceeds, SCDOT will make it a build" project. In that process, SCDOT will select a joint design and construction team to finalize plans on the project and build the bridge, 2) The design build process promotes innovation and allows teams to propose alternatives that can improve the project. This could include proposing new ways to access Pinckney Island than currently contemplated. 3) SCDOT is willing to include in the procurement documents and in the scoring of the proposals from the teams a preference for alternatives that provide two-way access onto Pinckney Island than the current plan to provide access solelytrom Hilton Head Island. This approach will allow the project to proceed on its current budget and provide an opportunity to apply additional innovation to the project that could resolve access concerns to Pinckney Island. Please do not hesitate to reach out if I can be of further assistance, Sincerely, W Justin P. Powell Secre ary of Transportation CC: Beaufort County Legislative Delegation SCDOT Commission www.scdot.org An Equal Opportunity Affirmative Action Employer (8554672368) Post Office Box 191 955 Park Street, Fioom 309 Columbia, SC 29202-0191 Page 9 of 93 William Hilton Parkway Gateway Corridor Master Plan TOWN OF HILTON HEAD ISLAND // JULY 28, 2026 DRAFT Attachment 2 Page 10 of 93 page 03 page 04 page 08 page 21 page 22 page 26 page 49 page 53 | TABLE OF CONTENTS Since We Last Met Project Extent Bridge Project Overview Project Objective + Guiding Principles + Influences Summary of Improvements Jenkins Island Improvements Stoney Neighborhood Improvements -Squire Pope Road / Chamberlin Drive Intersection -Wild Horse Road / Spanish Wells Road Intersection Old Wild Horse Corridor Improvements Analysis -Performance Matrix -Implementation Sequence -Additional Requests for SCDOT/Beaufort County -Projects Descriptions / Cost Estimates -Project Funding -Project Timeline -Additional Transportation System Improvement Projects Page 11 of 93 | SINCE WE LAST MET Safety and Operations Clarity • Updated traffic projections using latest 2025 SCDOT data • Added Squire Pope movement diagrams and intersection analysis • Finalized traffic simulation modeling • Reinforced proposed 40 MPH speed limit • Prioritized dangerous intersections within implementation sequencing Outreach + Property Impact Study • Reinforced direct access to/from WHP for Stewart properties and proposed pedestrian bridge crossing • Confirmed no right-of-way impacts to privately held properties, including the Humane Association and the Stewart family • Acknowledged additional corridor needs outside the study scope (Gum Tree, CIP Merge, Wilborn, etc.) Implementation Clarity • Reviewed and further separated project components to clarify costs • Provided funding strategy overview • Improved overall project documentation and presentation materials 3 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 12 of 93 Skull Creek Mackay Creek 278 | PROJECT EXTENT + KEY ZONES 4 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Jenkins Island Stoney Historic Neighborhood CorridorCounty Bridge Project Extent By BC/SCDOT WHP Gateway Corridor Project Extent Moss Creek DrMoss Creek Dr Spanish Wells RdSpanish Wells Rd Squire Pope RdSquire Pope Rd Wild Horse RdWild Horse Rd Bluffton PkwyBluffton Pkwy Gumtree RdGumtree Rd Cross Island PkwyCross Island Pkwy Chamberlin DrChamberlin Dr Crosstree DrCrosstree Dr C Heinrichs CirC Heinrichs Cir Jenkins RdJenkins Rd Page 13 of 93 278 • Implement adaptive signal upgrades on US Highway 278 to Interstate 95 • Design corridor enhancements from Moss Creek to Mackay Creek Bridge • Mitigate conditions of former gas station site • Upgrade to adaptive signal systems on Bluffton Parkway • Relocate Pinckney Island Ferry Embarkation OFF-ISLAND / WESTERN GATEWAY 1 2 3 4 5 31 2 4 5 Skull Creek Mackay Creek | BRIDGE PROJECT OVERVIEW County Bridge Project Extent By BC/SCDOT 5 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Moss Creek DrMoss Creek Dr Spanish Wells RdSpanish Wells Rd Squire Pope RdSquire Pope Rd Wild Horse RdWild Horse Rd Bluffton PkwyBluffton Pkwy Gumtree RdGumtree Rd Cross Island PkwyCross Island Pkwy Chamberlin DrChamberlin Dr Crosstree DrCrosstree Dr C Heinrichs CirC Heinrichs Cir Jenkins RdJenkins Rd Page 14 of 93 | BRIDGE PROJECT OVERVIEW Future New Off-Island Bridge New Bridge (3 Lane Capacity) New Bridge (3 Lane Capacity) New Bridge (3 Lane Capacity) Today Existing Bridges Bridge at end of life span Westbound Westbound Eastbound Eastbound Near-term New On-Island Bridge Westbound Westbound DemolishedDemolished Demolished Eastbound Eastbound Eastbound Eastbound Eastbound Eastbound (Future) Westbound Westbound Westbound 6 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Existing R/W Existing R/W Existing R/W Existing R/W Existing R/W Existing R/W Page 15 of 93 OBJECTIVE: Develop a comprehensive William Hilton Parkway Gateway Corridor Master Plan that will define the future of U.S. 278 from the Moss Creek western limits of the island through the historic Stoney Community and across the island’s main gateway CONSULTANT TEAM ROLE: Use local knowledge to create community- based solutions that enhance safety, community preservation, and character | MASTER PLAN OBJECTIVE 7 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 16 of 93 | CORRIDOR GUIDING PRINCIPLES 1 Fix transportation issues in the corridor to enhance safety and quality of life for all residents, workers and visitors 8 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT US 278 AT WILD HORSE ROAD / SPANISH WELLS ROAD US 278 AT SQUIRE POPE ROAD / CHAMBERLIN DRIVE US 278 IN THE STONEY NEIGHBORHOOD Page 17 of 93 | CORRIDOR GUIDING PRINCIPLES Improve safety and quality of life for the residents /neighborhoods / businesses directly impacted by the corridor improvements 2 1 Fix transportation issues in the corridor to enhance safety and quality of life for all residents, workers and visitors 9 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT ESTABLISH A TRUE PARKWAY ENHANCE PEDESTRIAN FACILITIES HONOR + CELEBRATE GULLAH GEECHEE CULTURE Page 18 of 93 | CORRIDOR GUIDING PRINCIPLES Create a gateway to Hilton Head Island that the region will be proud of3 Improve safety and quality of life for the residents /neighborhoods / businesses directly impacted by the corridor improvements 2 1 Fix transportation issues in the corridor to enhance safety and quality of life for all residents, workers and visitors 10 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT CELEBRATE THE SALT MARSH AND ARRIVING ON THE ISLAND CREATE NEW PUBLIC SPACE PRESERVE LOWCOUNTRY CHARACTER Page 19 of 93 Create a gateway to Hilton Head Island that the region will be proud of Improve hurricane / emergency evacuation route 34 | CORRIDOR GUIDING PRINCIPLES Improve safety and quality of life for the residents /neighborhoods / businesses directly impacted by the corridor improvements 2 1 Fix transportation issues in the corridor to enhance safety and quality of life for all residents, workers and visitors 11 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 20 of 93 | WHAT DEFINES A SUCCESSFUL CORRIDOR? SCDOT defines a successful corridor as one that delivers efficient, safe, and multimodal connections between primary economic centers, while supporting the movement of people and freight. A successful corridor is not just about road capacity—it’s about integrated multimodal performance, economic impact, and environmental stewardship. SCDOT INTERPRETATION 12 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 21 of 93 | WHAT DEFINES A SUCCESSFUL CORRIDOR? Efficient connections: Provide reliable, high-quality links between major economic hubs, enabling seamless travel and trade. Economic vitality: Enhance South Carolina’s competitiveness by creating an interconnected, intermodal network for freight and goods. Safety and security: Maintain a safe, secure, and efficient transportation system. Resource protection: Protect and enhance natural, historical, and cultural resources along the corridor. • Intersection, Approach, Movement Delay and Level of Service • Collision Severity • Crash Causational Factors • Conflict Point Reduction • Geometric Continuity • Multimodal Accommodations SCDOT CORE GOALS FOR A SUCESSFUL CORRIDOR KEY METRICS FOR SCDOT 13 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 22 of 93 278 278 Skull Creek Mackay Creek | 2024 SCDOT AVERAGE ANNUAL DAILY TRAFFIC VOLUMES 19,100 57,100 62,200 5,500 31,200 2,500 WHP Gateway Corridor Project Extent 50,400 7,100 32,900 10,600 278 14 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT *Average vehicles per day both directions Moss Creek DrMoss Creek Dr Spanish Wells RdSpanish Wells Rd Squire Pope RdSquire Pope Rd Wild Horse RdWild Horse Rd Bluffton PkwyBluffton Pkwy Gumtree RdGumtree Rd Cross Island PkwyCross Island Pkwy Chamberlin DrChamberlin Dr Crosstree DrCrosstree Dr C Heinrichs CirC Heinrichs Cir Page 23 of 93 Spanish Wells RdSpanish Wells Rd Wild Horse RdWild Horse Rd Gumtree RdGumtree Rd Cross Island PkwyCross Island Pkwy | 2024 SCDOT AVERAGE ANNUAL DAILY TRAFFIC VOLUMES 51.3% 48.7% • Traffic trends show an increasing use of the Cross Island Parkway with the removal of the toll in 2021 • Traffic volumes are near balanced between William Hilton Parkway and the Cross Island Parkway 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 2010 2012 2014 2016 2018 2020 2022 2024 2026 Average Daily Traffic Volumes -2011 - 2024 WHP Cross Island 278 WHP Gateway Corridor Project Extent 15 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT HONEY HORN HONEY HORN PLANTATIONPLANTATION Page 24 of 93 | PROJECT INFLUENCES - TRAFFIC SAFETY WHP Gateway Corridor Project Extent 16 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Most Frequent Least Frequent WHP GATEWAY CORRIDOR TRAFFIC COLLISIONS (2016-2024) • Total Collisions - 1,108 • Total Fatalities - 6 (2 involving pedestrians) • Total Major Injuries - 81 • Collisions at WHP/Squire Pope Rd & WHP/Wild Horse Rd intersections make up more than 40% of all collisions Skull Creek Mackay Creek Moss Creek DrMoss Creek Dr Spanish Wells RdSpanish Wells Rd Squire Pope RdSquire Pope Rd Wild Horse RdWild Horse Rd Bluffton PkwyBluffton Pkwy Gumtree RdGumtree Rd Cross Island PkwyCross Island Pkwy Chamberlin DrChamberlin Dr Crosstree DrCrosstree Dr C Heinrichs CirC Heinrichs Cir Jenkins RdJenkins Rd Page 25 of 93 | INTERSECTION ASSESSMENT - SQUIRE POPE ROAD / CHAMBERLIN DRIVE 2016–2024 Traffic Data | INTERSECTION ASSESSMENT – SQUIRE POPE ROAD / CHAMBERLIN DRIVE 1 5 16 24 104 Severity Minor Injury Possible Injury No Injury Fatal Serious Injury • 50% of the reported crashes at the intersection are rear end crashes • Angle crashes, typically a left-turn and through movement conflict, make up 32% of the total crash types • The top three probable causes for crashes at the intersection are • Distracted/Inattention (27%) • Failure to Yield ROW (24%) • Driving too fast for conditions (23%) Severity of Collision Angle Head On Non Collision Rear End Sideswipe, Same Direction Grand Total Fatal 1 1 Serious Injury 3 1 1 5 Minor Injury 9 3 4 16 Possible Injury 14 10 24 No Injury 21 7 61 15 104 Grand Total 48 4 8 75 15 150 17 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 26 of 93 | INTERSECTION ASSESSMENT - SQUIRE POPE ROAD / CHAMBERLIN DRIVE | INTERSECTION ASSESSMENT – SQUIRE POPE ROAD / CHAMBERLIN DRIVE Squire Pope Rd Chamberlin Dr 2025 EXISTING CONFIGURATION LEVEL OF SERVICE (10) 1 (29) 2 (6) 5 200 (257) 0 (3) 48 (57) (141) 190 (1,938) 2,634 (36) 3 36 (74) 1,256 (2,629) 3 (6) Squire Pope Rd Chamberlin Dr 2025 AM & (PM) TURNING MOVEMENT VOLUMES Squire Pope Rd Chamberlin Dr Continuous Green T Configuration 2030 LEVEL OF SERVICE Traffic Level of Service (LOS) is a standardized metric used by transportation engineers to evaluate and communicate road congestion, travel time delay, and driver maneuverability. Traffic engineers use Turning Movement Counts (TMCs) to quantify exactly how many vehicles, pedestrians, and cyclists enter, exit, and turn at intersections. This data is essential for designing safe roadways, optimizing traffic signals, managing congestion, and evaluating the need for new traffic control devices 18 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 27 of 93 | INTERSECTION ASSESSMENT - SPANISH WELLS ROAD / WILD HORSE ROAD 2016–2024 Traffic Data | INTERSECTION ASSESSMENT – SPANISH WELLS ROAD / WILD HORSE ROAD 2 1 11 21 99 Severity Minor Injury Possible Injury No Injury Fatal Serious Injury • 47% of the reported crashes at the intersection are rear end crashes • Angle crashes, typically a left-turn and through movement conflict, make up 28% of the total crash types • The top three probable causes for crashes at the intersection are • Distracted/Inattention (27%) • Failure to Yield ROW (24%) • Driving too fast for conditions (23%) Severity of Collision Angle Head On Non-Collision Rear End Sideswipe, Same Direction Unknown Grand Total Fatal 2 2 Serious Injury 1 1 Minor Injury 7 1 2 1 11 Possible Injury 7 3 1 9 1 21 No Injury 23 1 6 52 16 1 99 Grand Total 37 4 11 63 18 1 134 19 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 28 of 93 | INTERSECTION ASSESSMENT - SPANISH WELLS ROAD / WILD HORSE ROAD | INTERSECTION ASSESSMENT – SPANISH WELLS ROAD / WILD HORSE ROAD Wild Hoes Rd Spanish Wells Rd Wild Horse Rd Spanish Wells Rd 2025 AM & (PM) TURNING MOVEMENT VOLUMES Wild Horse Rd Spanish Wells Rd Dual Left-Turn Configuration (176) 109 (42) 42 (71) 93 9 (18) 48 (58) 102 (79) (63) 60 (1,759) 2,439 (150) 143 45 (113) 1,163 (2,397) 48 (56) Traffic Level of Service (LOS) is a standardized metric used by transportation engineers to evaluate and communicate road congestion, travel time delay, and driver maneuverability. Traffic engineers use Turning Movement Counts (TMCs) to quantify exactly how many vehicles, pedestrians, and cyclists enter, exit, and turn at intersections. This data is essential for designing safe roadways, optimizing traffic signals, managing congestion, and evaluating the need for new traffic control devices 2025 EXISTING CONFIGURATION LEVEL OF SERVICE 20 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 29 of 93 | SUMMARY OF IMPROVEMENTS Enhance pedestrian pathways and create better connectivity in corridor Provide streetscape improvements (landscape, medians, grading, signage, art) Improve level of service and vehicular thru-put at problematic intersections with posted speed reduced to 40 mph Reconfigure Wild Horse Road / Spanish Wells Road intersection to support continuous on-island traffic flow Reconfigure Squire Pope Road / Chamberlin Drive intersection to support continuous on-island traffic flow Establish Gullah Geechee Heritage Park Construct additional eastbound travel lane Construct additional westbound travel lane Page 30 of 93 JENKINS ISLAND Page 31 of 93 Skull Creek Mackay Creek | JENKINS ISLAND KEY MAP 278 Jenkins Island County Bridge Project Extent By BC/SCDOT 23 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Moss Creek DrMoss Creek Dr Spanish Wells RdSpanish Wells Rd Squire Pope RdSquire Pope Rd Wild Horse RdWild Horse Rd Bluffton PkwyBluffton Pkwy Gumtree RdGumtree Rd Cross Island PkwyCross Island Pkwy Chamberlin DrChamberlin Dr Crosstree DrCrosstree Dr C Heinrichs CirC Heinrichs Cir Jenkins RdJenkins Rd Page 32 of 93 0 N 200' 300' 100' PLANSCALE: 1" = 200'-0" TOWN-OWNED PROPERTIES | JENKINS ISLAND - ROADWAY IMPROVEMENTS Windmill Harbour Harbor RV Resort Hog Island 278 278 C Heinrichs Cir Utility Corridor Jenkins Rd Hilton Head PSD #1 Jenkins Island Cemetery Crosstree Dr 24 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Existing bridge alignment Future bridge alignment, by BC/SCDOT New intersection mast arm Expanded median planting, convert Jenkins Road to right-in right out Access road and pathway connection to Jenkins Road (1) new eastbound lane, (1) westbound lane in future phase Access road and pathway connection to Hog Island, by BC/SCDOT Hilton Head Harbor Marina Town Owned Property Beaufort County Property Beaufort County Property Page 33 of 93 0 N 200' 300' 100' PLANSCALE: 1" = 200'-0" TOWN-OWNED PROPERTIES 278 | JENKINS ISLAND - PEDESTRIAN IMPROVEMENTS Jenkins Island Cemetery Windmill Harbour Harbor RV Resort Hog Island Hilton Head PSD #1 Hilton Head Harbor Marina Landscape improvements between bridge abutment and Windmill Harbour 278 278 C Heinrichs Cir Utility Corridor Jenkins Rd Crosstree Dr 25 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Pathway connection under bridge New pedestrian crossing on south side of intersection Trail-head park with parking and vehicular access to Jenkins Island Cemetery Pathways connecting Jenkins Island to Stoney Historic Neighborhood Town Owned Property Beaufort County Property Beaufort County Property Page 34 of 93 STONEY HISTORIC NEIGHBORHOOD CORRIDOR Page 35 of 93 Skull Creek Mackay Creek 278 | STONEY HISTORIC NEIGHBORHOOD KEY MAP Jenkins Island County Bridge Project Extent By BC/SCDOT Moss Creek DrMoss Creek Dr Spanish Wells RdSpanish Wells Rd Squire Pope RdSquire Pope Rd Wild Horse RdWild Horse Rd Bluffton PkwyBluffton Pkwy Gumtree RdGumtree Rd Cross Island PkwyCross Island Pkwy Chamberlin DrChamberlin Dr Crosstree DrCrosstree Dr C Heinrichs CirC Heinrichs Cir Jenkins RdJenkins Rd 27 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Stoney Historic Neighborhood Corridor Page 36 of 93 0 N 200' 300' 100' PLAN SCALE: 1" = 200'-0" TOWN-OWNED PROPERTIES | STONEY HISTORIC NEIGHBORHOOD - ROADWAY IMPROVEMENTS 278 28 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT WHP fly-over Expanded median planting Extension of Chamberlin Drive to Old Schoolhouse Park with new connections to private parcels + Adrianna Lane access removed Reconfigure intersection to Continuous Green-T (1) new eastbound lane, (1) westbound lane in future phase Streetscape enhancements on Old Wild Horse Road Potential future Northpoint connection The Crazy Crab Parkers Tin and Tallow GGHNCDC Headquarters GGHNCDC future use Fairfield Station Connector between Wild Horse Road and Old Wild Horse Road Jenkins Island Jarvis Creek Old Schoolhouse Park Hilton Head Humane Association Humane Way Town Owned Property Gullah Geechee Historic Neighborhoods CDC Property SCDOT Extension of Chamberlin Drive to Humane Way + improvements to Humane Way to connect to Spanish Wells Road 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Note: No right-of-way acquisition required in Stoney Historic Neighborhood with proposed roadway improvements Page 37 of 93 0 N 200' 300' 100' PLAN SCALE: 1" = 200'-0" TOWN-OWNED PROPERTIES | STONEY HISTORIC NEIGHBORHOOD - PEDESTRIAN IMPROVEMENTS 278 29 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT The Crazy Crab Parkers Tin and Tallow GGHNCDC Headquarters GGHNCDC future use New pedestrian bridge over WHP connecting north Stoney to new Gullah Geechee Heritage Park Additional park-space showcasing Gullah Geechee heritage New sidewalks on Old Wild Horse Road Fairfield Station Humane Way Pathways connecting Jenkins Island to Stoney Jenkins Island Jarvis Creek Old Schoolhouse Park 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Hilton Head Humane Association SCDOT Town Owned Property Gullah Geechee Historic Neighborhoods CDC Property Note: No right-of-way acquisition required in Stoney Historic Neighborhood with proposed roadway improvements Page 38 of 93 | STONEY HISTORIC NEIGHBORHOOD - ENLARGED PLAN 278 0 N 200' 300' 100' PLAN SCALE: 1" = 200'-0" TOWN-OWNED PROPERTIES 30 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT The Crazy Crab GGHNCDC Headquarters Property access maintained by Stewart family Old Schoolhouse Park 278 Squire Pope Road Chamberlin Drive Town Owned Property Gullah Geechee Historic Neighborhoods CDC Property Note: No right-of-way acquisition required in Stoney Historic Neighborhood with proposed roadway improvements Page 39 of 93 SQUIRE POPE ROAD / CHAMBERLIN DRIVE INTERSECTION ENLARGEMENT Page 40 of 93 | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Continuous Green-T 32 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Continuous flow for eastbound traffic New pedestrian bridge for north-south connection Closure of thru-movement between Chamberlin Drive and Squire Pope Road; right-in, right-out only from Chamberlin Drive and timed left turns from Squire Pope Road at peak hours Squire Pope RdSquire Pope Rd Chamberlin Drive Chamberlin Drive New connection into Old Schoolhouse Park and future Gullah Geechee Heritage Park GREEN SHANI MAIA GREENBERGKING LLC LAM HUONG THI DRIESSEN ALICE R. PENA ADRIENNE WASHINGTON WASHINGTON ALYSIA T SAM DAVID GEORG WRIGHT BETTY MAULDIN EVELENA WILLIAMS RUBY SIMMONS DESAREE WASHINGTON AMANDA Town Owned Property Gullah Geechee Historic Neighborhoods CDC Property GGHNCDC HEADQUARTERS PERRY CLARENCE II 278 Page 41 of 93 | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Continuous Green-T 33 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Squire Pope Road Chamberlin Drive 278 Page 42 of 93 | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Continuous Green-T: Signal Operations Adaptive 3-Phase Signal Operation Phase 1: Major Road Left-Turn Yield / Opposing Through (Continuous Flow) In this phase, traffic in one major-road direction continues straight through uninterrupted (often signaled by a green through arrow). Drivers turning left from the opposite major- road direction are given a protected or protected-permissive green arrow to safely cross the continuous flow. 34 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT 278 Squire Pope Road Chamberlin Drive Page 43 of 93 | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Continuous Green-T: Signal Operations Adaptive 3-Phase Signal Operation Phase 1: Major Road Left-Turn Yield / Opposing Through (Continuous Flow) In this phase, traffic in one major-road direction continues straight through uninterrupted (often signaled by a green through arrow). Drivers turning left from the opposite major- road direction are given a protected or protected-permissive green arrow to safely cross the continuous flow. 35 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT 278 Squire Pope Road Chamberlin Drive Page 44 of 93 | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Continuous Green-T: Signal Operations Adaptive 3-Phase Signal Operation Phase 1: Major Road Left-Turn Yield / Opposing Through (Continuous Flow) In this phase, traffic in one major-road direction continues straight through uninterrupted (often signaled by a green through arrow). Drivers turning left from the opposite major- road direction are given a protected or protected-permissive green arrow to safely cross the continuous flow. Phase 2: Side-Street Right Turn (Continuous Flow) Traffic moving in the continuous major-road direction still flows uninterrupted. Minor road vehicles turning right onto the major road do so via a yield-controlled lane. 36 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Squire Pope Road Chamberlin Drive 278 Page 45 of 93 | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Continuous Green-T: Signal Operations Adaptive 3-Phase Signal Operation Phase 1: Major Road Left-Turn Yield / Opposing Through (Continuous Flow) In this phase, traffic in one major-road direction continues straight through uninterrupted (often signaled by a green through arrow). Drivers turning left from the opposite major- road direction are given a protected or protected-permissive green arrow to safely cross the continuous flow. Phase 2: Side-Street Right Turn (Continuous Flow) Traffic moving in the continuous major-road direction still flows uninterrupted. Minor road vehicles turning right onto the major road do so via a yield-controlled lane. Phase 3: Side-Street Left Turn & Major Road Stopping When side-street left-turning vehicles or pedestrian phases are activated, the major road’s continuous direction receives a red light to stop traffic. Vehicles turning left from the side street are given a green arrow to merge onto the major road, while traffic on the opposing major approach is also serviced 37 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT 278 Squire Pope Road Chamberlin Drive Page 46 of 93 38 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT • Safety Performance: Reduces overall crashes, including serious injury and fatal crashes, by minimizing stop-and-go traffic on the main roadway. • Target Crashes: Helps reduce common crash types such as angle and rear-end collisions. • Potential Risks: Special accommodations are needed to safely cross free-flow lanes, such as pedestrian bridges or underpasses. • Operational Benefits: Improves operations by reducing delays and shortening travel times. • Considerations: Most effective at three-leg intersections with heavy through traffic, low side-street turning volumes, and limited pedestrian activity. Proper site selection and design are essential. | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Continuous Green-T: Takeaways Page 47 of 93 39 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Traffic Simulation CLICK HER TO VIEW EXISTING CONDITIONS CLICK HERE TO VIEW THE PROPOSED CONDITIONS Note: Roadway layout of traffic simulation model reflects the function and vehicle movements of the proposed master plan but looks different from the actual design. This is a normal function of the software that simplifies certain design elements for sake of traffic analysis accuracy and communication clarity. https://vimeo.com/1211733544/6d639bdf32 https://vimeo.com/1211733545/88ae3ee738 If you are having difficulty opening the video link, please copy and paste the URL into your web browser. Page 48 of 93 | SQUIRE POPE ROAD / CHAMBERLIN DRIVE Additional Improvements 40 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Squire Pope R oad Chamberlin Drive 278 Page 49 of 93 | PEDESTRIAN BRIDGE PRECEDENTS 41 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 50 of 93 SPANISH WELLS ROAD / WILD HORSE ROAD INTERSECTION ENLARGEMENT Page 51 of 93 | SPANISH WELLS ROAD /WILD HORSE ROAD Baseline Improvements New right turn lane + designated thru-lane Access to properties maintained New right turn lane + designated thru-lane 43 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT ATLAS SHRUGGED LLC SCDOT TIBERIUS HHI LLC New Pathway crossing Spanish Wells Road Spanish Wells Road Wild Horse Road Wild Horse Road New pathway into Old Schoolhouse Park + future Gullah Geechee Heritage Park Old Schoolhouse Park Town Owned Property Additional left turn lane TIN AND TALLOW PARKERS 278 Page 52 of 93 | SPANISH WELLS ROAD /WILD HORSE ROAD Baseline Improvements 44 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Spanish Wells Road Wild Horse Road 278 Page 53 of 93 | SPANISH WELLS ROAD /WILD HORSE ROAD Fly-over (Hybrid Cloverleaf Configuration) Access roads to utilize existing roadway alignments Bridge with pathway connection over WHP Connection to Wild Horse Road Connection to Spanish Wells Road Extension of Chamberlin Drive to Humane Way + improvements to Humane Way to connect to Spanish Wells Road Connector between Wild Horse Road and Old Wild Horse Road Potential future Northpoint connection 45 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT CANNICK LEANDER (LIFE ESTATE) JR DKD REALITY INC SPURLING MARK SCDOT CTG RENTALS LLC FAIRFIELD HORIZONTAL PROPERTY OWNERS REGIME TIBERIUS HHI LLC Spanish Wells RoadSpanish Wells Road Humane WayHumane Way Wild Horse RoadWild Horse Road Old Wild Horse Road Old Wild Horse Road Old Schoolhouse Park JENKINS ESQUIVEL & FUENTES LLC ROSA LEE DRIESSEN TRUST Town Owned Property Gullah Geechee Historic Neighborhoods CDC Property TIN AND TALLOW HILTON HEAD HUMANE ASSOCIATION PARKERS 278 Page 54 of 93 | SPANISH WELLS ROAD /WILD HORSE ROAD Fly-over (Hybrid Cloverleaf Configuration) 46 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Spanish Wells Road Humane Way Wild Horse Road 278 Page 55 of 93 | SPANISH WELLS ROAD /WILD HORSE ROAD Traffic Simulations CLICK HERE TO VIEW EXISTING CONDITIONS CLICK HERE TO VIEW PROPOSED CONDITIONS 47 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Note: Roadway layout of traffic simulation model reflects the function and vehicle movements of the proposed master plan but looks different from the actual design. This is a normal function of the software that simplifies certain design elements for sake of traffic analysis accuracy and communication clarity. https://vimeo.com/1211734754/4fcd488c2c https://vimeo.com/1211734753/20311954a5 If you are having difficulty opening the video link, please copy and paste the URL into your web browser. Page 56 of 93 | FLY-THROUGH ANIMATION LINK https://vimeo.com/1194130909/c3f0588290?share=copy&fl=sv&fe=ci If you are having trouble opening the link to the video please copy and paste the URL above into your web browser. Page 57 of 93 OLD WILD HORSE ROAD CORRIDOR IMPROVEMENTS Page 58 of 93 | OLD WILD HORSE ROAD - DESIGN VISION 50 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Provide curb & gutter in-lieu of drainage ditch Provide pathway connectivity on east side of roadway to better serve businesses Eliminate pathway inconsistencies Provide planting to improve aesthetic Page 59 of 93 | OLD WILD HORSE ROAD - DESIGN VISION 51 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT New sidewalk, to meander where possible Planted tree lawn buffer New curb and gutter Page 60 of 93 65'-0" FT RW DRIVE 12'-0" DRIVE 12'-0" PATHWAY 8'-0" DRAINAGE +/-8'-0" DRAINAGE +/-25'-0" 65'-0" FT RW DRIVE 10'-0" DRIVE 10'-0" PATHWAY 8'-0" PLANTED +/-8'-0" PATHWAY +/-8'-0" 2'-0" CURB + GUTTER PLANTED +/-8'-0" TREE LAWN +/-8'-0" 65'-0" FT RW DRIVE 12'-0" DRIVE 12'-0" PATHWAY 8'-0" DRAINAGE +/-8'-0" DRAINAGE +/-25'-0" 65'-0" FT RW DRIVE 10'-0" DRIVE 10'-0" PATHWAY 8'-0" PLANTED +/-8'-0" PATHWAY +/-8'-0" 2'-0" CURB + GUTTER PLANTED +/-8'-0" TREE LAWN +/-8'-0" | OLD WILD HORSE ROAD - DESIGN VISION PROPOSED STREET SECTION EXISTING STREET SECTION 52 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 61 of 93 ANALYSIS Page 62 of 93 | WILLIAM HILTON PARKWAY GATEWAY CORRIDOR MASTER PLAN 54 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Old Schoolhouse Park Stoney Historic Neighborhood Jenkins Island Jarvis Creek Town Owned Property Gullah Geechee Historic Neighborhoods CDC Property Page 63 of 93 Create a gateway to Hilton Head Island that the region will be proud of Improve hurricane / emergency evacuation route 3 4 | COMMUNITY GENERATED GOALS OF CORRIDORS Improve safety and quality of life for the residents /neighborhoods / businesses directly impacted by the corridor improvements 2 1 Fix transportation issues in the corridor to enhance safety and quality of life for all residents, workers and visitors 55 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 64 of 93 | PERFORMANCE MATRIX ELEMENT PERFORMANCE OPERATIONAL BENEFIT 3 3 8 4 8 8 4 2 9 Additional eastbound travel lane (From bridge to Squire Pope Road) Additional westbound travel lane (From Squire Pope Road to Bridge) Eastbound Continuous Green-T at Squire Pope Rd / Chamberlin Dr intersection + pedestrian bridge Baseline improvements at Spanish Wells Rd / Wild Horse Rd intersection Fly-over bridge at Spanish Wells Rd / Wild Horse Rd intersection INTERSECTION CORRIDOR Reduces congestion during the AM peak hours. Delay for the eastbound and side street movements will also be reduced Reduces congestion during the PM peak hours. Delay for the westbound and side street movements will also be reduced Reduces WHP delay by creating continuous eastbound movement. Reduces delay for westbound by removing frequency of signal stops. Provides congestion relief for the Spanish Wells Road and Wild Horse Road approaches. WHP will see limited benefit from this improvement. WHP will benefit significantly as the majority of through-put delay will be removed for eastbound movements. Westbound delay will improve but will be controlled by future bridge performance and other improvements to US 278 100 5 LITTLE CONGESTION RELIEF MODERATE CONGESTION RELIEF NO CONGESTION 10 Page 65 of 93 | PROJECTS SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F Project G PROJECT C Project K Project I Project E PROJECT D Project D PROJECT E Project H PROJECT F Project J PROJECT G Project L PROJECT H PROJECT I PROJECT J PROJECT K PROJECT L 57 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park Page 66 of 93 PROJECT DESCRIPTION ESTIMATED COST * $125,800,000SUB TOTAL $4,300,000PROJECT A (INTERSECTION - SHORT TERM IMPROVEMENT) Implement baseline improvements at Spanish Wells Road and Wild Horse Road intersection $900,000PROJECT B (INTERSECTION - SHORT TERM IMPROVEMENT) Implement Eastbound Continuous Green-T at Squire Pope Road / Chamberlin Drive intersection $14,100,000PROJECT C (INTERSECTION + PATHWAY IMPROVEMENTS) Construct pedestrian bridge west of Squire Pope Road / Chamberlin Drive intersection $36,100,000PROJECT D (INTERSECTIONS - LONG TERM IMPROVEMENT) Construct Fly-over Bridge at Spanish Wells Road / Wild Horse Road intersection including new roundabouts $3,600,000PROJECT F (ROAD CONNECTION) Extend Chamberlin Drive to connect with Spanish Wells $20,200,000PROJECT K (ROAD EXPANSION) Construct an additional eastbound travel lane from bridge to Squire Pope Road / Chamberlin Drive intersection $1,100,000PROJECT E (INTERSECTION - SHORT TERM IMPROVEMENT) Implement intersection improvements at Crosstree Drive / C Heinrichs Circle (Windmill Harbour entrance) $16,600,000PROJECT I (PATHWAY IMPROVEMENTS) Implement corridor pathway, landscape, wayfinding, placemaking improvements $4,700,000PROJECT H (STREETSCAPE IMPROVEMENT) Implement Old Wild Horse Road streetscape enhancements $8,100,000PROJECT J (INTERSECTIONS - LONG TERM IMPROVEMENT) Construct Jenkins Island access road, parking lots, cemetery improvements $13,600,000PROJECT L (ROAD EXPANSION) Construct additional westbound travel lane from Squire Pope / Chamberlin intersection to bridge | PROJECTS OVERVIEW *Estimated costs based on 2025 estimates $2,500,000PROJECT G (PARK IMPROVEMENT) Develop Gullah Geechee Heritage Park Page 67 of 93 | SCDOT/BC PROJECT SCDOT SCDOT / BC 59 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Windmill Harbour Hog Island Old Schoolhouse Park Stoney Historic Neighborhood Jenkins Island Jarvis Creek C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Page 68 of 93 | PROJECT A ELEMENT COMPONENTS ESTIMATED COST $4,300,000Baseline Improvements at Spanish Wells / Wild Horse intersection • Additional pavement / turn lane capacity • Curb & gutter & drainage • Pavement markings • Landscaping • Pathway / curb ramp adjustments • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A 60 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Windmill Harbour Hog Island Old Schoolhouse Park Stoney Historic Neighborhood Jenkins Island Jarvis Creek C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Page 69 of 93 ELEMENT COMPONENTS ESTIMATED COST $900,000Eastbound Continuous Green-T at Squire Pope / Chamberlin Intersection • Additional pavement / turn lane capacity • Raised concrete medians • Pavement markings • Curb & gutter & drainage • Landscaping + signage • Pathway / curb ramp adjustments • Utility work • Traffic control | PROJECT B SCDOT SCDOT / BC PROJECT A Project A PROJECT B Project B 61 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Windmill Harbour Hog Island Old Schoolhouse Park Stoney Historic Neighborhood Jenkins Island Jarvis Creek C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Page 70 of 93 | PROJECT C ELEMENT COMPONENTS ESTIMATED COST $14,100,000Pedestrian Bridge west of Squire Pope / Chamberlin Drive • 750’ bridge with decorative handrails, lighting & finishes • Deep foundations • Steel superstructure • Concrete deck • Lanscaping & signage • Pathway / curb ramp adjustments • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B PROJECT C 62 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Windmill Harbour Hog Island Old Schoolhouse Park Stoney Historic Neighborhood Jenkins Island Jarvis Creek C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Page 71 of 93 | PROJECT D ELEMENT COMPONENTS ESTIMATED COST $36,100,000Fly-over bridge at Spanish Wells / Wild Horse intersection • Bridge with pathway, handrails & lighting • MSE walls • Concrete retaining walls • Curb & gutter & drainage • Landscaping + signage • Pathway / curb ramp adjustments • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B PROJECT C PROJECT D Project D 63 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Windmill Harbour Hog Island Old Schoolhouse Park Stoney Historic Neighborhood Jenkins Island Jarvis Creek C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Page 72 of 93 | PROJECT E ELEMENT COMPONENTS ESTIMATED COST $1,100,000Windmill Harbour intersection improvements • Mast-arm pole replacement • Pathway / curb ramp adjustments • Landscaping • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B PROJECT C Project E PROJECT D Project D PROJECT E C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 64 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 73 of 93 | PROJECT F ELEMENT COMPONENTS ESTIMATED COST $3,600,000Extend Chamberlin Drive to Spanish Wells Road • Additional pavement • Curb & gutter & drainage • Pavement markings • Landscaping • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F PROJECT C Project E PROJECT D Project D PROJECT E PROJECT F C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 65 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 74 of 93 | PROJECT G ELEMENT COMPONENTS ESTIMATED COST $2,500,000Develop Gullah Geechee Heritage Park • Pathways/ boardwalks • Permeable parking area • Shelter • Site Lighting • Landscaping • Environmental graphics / signage elements • Utility work SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F Project G PROJECT C Project E PROJECT D Project D PROJECT E PROJECT F PROJECT G C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 66 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 75 of 93 | PROJECT H ELEMENT COMPONENTS ESTIMATED COST $4,700,000Old Wild Horse Road improvements • Curb & gutter & drainage • Asphalt pathways • Pavement markings • Landscaping • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F Project G PROJECT C Project E PROJECT D Project D PROJECT E Project H PROJECT F PROJECT G PROJECT H C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 67 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 76 of 93 | PROJECT I ELEMENT COMPONENTS ESTIMATED COST $16,600,000Corridor-wide pathway, landscape, wayfinding, and placemaking • Asphalt pathways • Boardwalk structures • Pavement markings • Pathway signage • Landscaping • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F Project G PROJECT C Project I Project E PROJECT D Project D PROJECT E Project H PROJECT F PROJECT G PROJECT H PROJECT I C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 68 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 77 of 93 | PROJECT J ELEMENT COMPONENTS ESTIMATED COST $8,100,000Jenkins Island Access Road, Parking, Cemetery Park • Additional pavement • Curb & gutter & drainage • Pavement markings • Landscaping • Park improvements • Utility work • Traffic control • Parking lots SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F Project G PROJECT C Project I Project E PROJECT D Project D PROJECT E Project H PROJECT F Project J PROJECT G PROJECT H PROJECT I PROJECT J C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 69 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 78 of 93 | PROJECT K ELEMENT COMPONENTS ESTIMATED COST $20,200,000Additional Eastbound Travel Lane (Bridge to Squire Pope Road) • Additional pavement • Curb & gutter & drainage • Pavement markings • Landscaping + signage • Pathway / curb ramp adjustments • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F Project G PROJECT C Project K Project I Project E PROJECT D Project D PROJECT E Project H PROJECT F Project J PROJECT G PROJECT H PROJECT I PROJECT J PROJECT K C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 70 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 79 of 93 | PROJECT L ELEMENT COMPONENTS ESTIMATED COST $13,600,000Additional Westbound Travel Lane (Squire Pope Road to Bridge) • Additional pavement • Curb & gutter & drainage • Pavement markings • Landscaping + signage • Pathway / curb ramp adjustments • Utility work • Traffic control SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F Project G PROJECT C Project K Project I Project E PROJECT D Project D PROJECT E Project H PROJECT F Project J PROJECT G Project L PROJECT H PROJECT I PROJECT J PROJECT K PROJECT L C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 71 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 80 of 93 | FULL PROJECT BUILD OUT ESTIMATED COST $125,800,000 SCDOT SCDOT / BC Project A PROJECT A PROJECT B Project C Project B Project F Project G PROJECT C Project K Project I Project E PROJECT D Project D PROJECT E Project H PROJECT F Project J PROJECT G Project L PROJECT H PROJECT I PROJECT J PROJECT K PROJECT L C Heinrichs Cir Jenkins Rd 278 278 Old Wild Horse Rd Spanish Wells Rd Squire Pope Road Chamberlin Drive Wild Horse Rd Windmill Harbour Hog Island Stoney Historic Neighborhood Jenkins Island Jarvis Creek Old Schoolhouse Park 72 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 81 of 93 | PROJECT FUNDING PATHS Safe Streets and Roads for All (SS4A) • Town applied for SS4A Grant for $23M in May 2026 BUILD Grants (Formerly RAISE) INFRA Program PROTECT Program Transportation Alternatives Set-Aside (TASA) Bridge Investment Program Carbon Reduction Program Federal Transit Administration (FTA) Programs Reconnecting Communities Grant Congressional Direct Spending (Senate) Congressional Community Project Funding (House) FEDERAL Tax Increment Financing (TIF) District County Transportation Sales Tax Town Sales Tax (SB 866) Town General Obligation Bonds Impact Fee Revenue Town Funding SCDOT • Transit Alternatives Program (TAP) • SCDOT Guideshare Program • SCDOT Bicycle & Pedestrian Program • SCDOT Highway Safety Improvement Program State Direct Appropriation State Infrastructure Bank SC Department of Public Safety Highway Safety Grants Lowcountry Area Transportation Study LOCALSTATE 73 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 82 of 93 | PROCEDURAL STEPS FOR NEPA ASSIGNMENT Coordination meeting with Federal Highway Administration (FHWA) Provide public notice of intent to pursue NEPA Assignment Prepare a draft application and publish for public comment Prepare a draft memorandum of understanding and publish for public comment Execute the Memorandum of Understanding (MOU) to assume federal responsibilities 1 2 3 4 5 All projects funded with direct or indirect federal funds will require the project to follow the National Environmental Policy Act (NEPA) process 74 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 83 of 93 | ESTIMATED PROJECT TIMELINE Project Development Phase Feasibility Study / Master Planning Engineering, Permitting & Project Readiness Construction & Implementation Variable Timeframe 2-3 years depending on project specifics and funding 1.5-3 years per project Final Engineering / Permits in Hand Master Plan Adoption Ribbon Cutting Preliminary Engineering • Establishes the need of the project • Establishes potential project impacts • Establishes potential level of environmental review • Identifies potential funding strategies • Determines which NEPA document will be required – decided by major permitting agency -Categorical Exclusion (CATEX) -Environmental Assessment -Environmental Impact Statement • Develops design plans for implementation • Achieves project approval • Achieves project insertion into Statewide Transportation Improvement Plan (STIP) • Defines and aligns how the project will be funded • Delivery of project • Project completion is subject to funding availability and regulatory approvals. 75 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 84 of 93 | ADDITIONAL REQUESTS FOR SCDOT AND BEAUFORT COUNTY SCDOT / Beaufort County examine continuous flow traffic in Windmill Harbour area allowing for elimination of existing traffic signal by routing Crosstree Dr & C Heinrichs Cir traffic under bridges. SCDOT examine re-striping the westbound Cross Island Parkway into two lanes and corresponding adjustments to William Hilton Parkway, reducing the number of merge lanes. Request SCDOT examine the use of pavement markings (i.e., chevrons) and other signage to improve vehicular movement and safety. 76 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 85 of 93 | ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS Gum Tree Road • Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse) • Signal timing • Operational enhancements • New pathway with lighting from Northpoint to Bus Drive • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction • School zone 77 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 86 of 93 | ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS Gum Tree Road • Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse) • Signal timing • Operational enhancements • New pathway with lighting from Northpoint to Bus Drive • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction • School zone Squire Pope Road • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction 78 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 87 of 93 | ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS Gum Tree Road • Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse) • Signal timing • Operational enhancements • New pathway with lighting from Northpoint to Bus Drive • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction • School zone Squire Pope Road • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction Main Street • Pedestrian safety improvements • New sidewalks • New walkway lighting • Operational enhancements at key intersections (e.g. Wilborn Road and Whooping Crane Way) 79 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 88 of 93 | ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS Gum Tree Road • Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse) • Signal timing • Operational enhancements • New pathway with lighting from Northpoint to Bus Drive • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction • School zone Squire Pope Road • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction Main Street • Pedestrian safety improvements • New sidewalks • New walkway lighting • Operational enhancements at key intersections (e.g. Wilborn Road and Whooping Crane Way) Wilborn Road • Intersection improvements (WHP , Bus Drive, Main Street) • Signal timing • Pedestrian safety improvements • Operational enhancements in conjunction with Main Street improvements 80 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 89 of 93 | ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS Gum Tree Road • Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse) • Signal timing • Operational enhancements • New pathway with lighting from Northpoint to Bus Drive • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction • School zone Squire Pope Road • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction Main Street • Pedestrian safety improvements • New sidewalks • New walkway lighting • Operational enhancements at key intersections (e.g. Wilborn Road and Whooping Crane Way) Wilborn Road • Intersection improvements (WHP , Bus Drive, Main Street) • Signal timing • Pedestrian safety improvements • Operational enhancements in conjunction with Main Street improvements Palmetto Bay Road and Arrow Road / Point Comfort Road • Signal timing • Operational enhancements • Pedestrian safety improvements 81 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 90 of 93 | ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS Gum Tree Road • Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse) • Signal timing • Operational enhancements • New pathway with lighting from Northpoint to Bus Drive • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction • School zone Squire Pope Road • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction Main Street • Pedestrian safety improvements • New sidewalks • New walkway lighting • Operational enhancements at key intersections (e.g. Wilborn Road and Whooping Crane Way) Wilborn Road • Intersection improvements (WHP , Bus Drive, Main Street) • Signal timing • Pedestrian safety improvements • Operational enhancements in conjunction with Main Street improvements Palmetto Bay Road and Arrow Road / Point Comfort Road • Signal timing • Operational enhancements • Pedestrian safety improvements Sea Pines Circle Short-Term and Long-Term Improvements • Operational enhancements (i.e., metered entries from approaches) • Partnership with SCDOT on project development process 82 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 91 of 93 | ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS Gum Tree Road • Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse) • Signal timing • Operational enhancements • New pathway with lighting from Northpoint to Bus Drive • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction • School zone Squire Pope Road • Pedestrian safety improvements • New pathway lighting • Mailbox location improvements • Speed reduction Main Street • Pedestrian safety improvements • New sidewalks • New walkway lighting • Operational enhancements at key intersections (e.g. Wilborn Road and Whooping Crane Way) Wilborn Road • Intersection improvements (WHP , Bus Drive, Main Street) • Signal timing • Pedestrian safety improvements • Operational enhancements in conjunction with Main Street improvements Palmetto Bay Road and Arrow Road / Point Comfort Road • Signal timing • Operational enhancements • Pedestrian safety improvements Sea Pines Circle Short-Term and Long-Term Improvements • Operational enhancements (i.e., metered entries from approaches) • Partnership with SCDOT on project development process William Hilton Parkway Adaptive Signal Timing and Operations Assessment • Improve signal timing • Assess signal operations and improve adaptive system • Coordination with SCDOT , Lowcountry Area Transportation Study, and Beaufort County 83 TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT Page 92 of 93 THANK YOU! Page 93 of 93

Source: Town of Hilton Head Island website. First collected Oct 13, 2026.