Town Council Workshop Meeting — Agenda Packet
Town of Hilton Head Island · Beaufort County · Town Council · meeting of Jul 28, 2026 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
Town Council Workshop Meeting
Tuesday, July 28, 2026, 3:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Adoption of the Agenda
3. Workshop Discussion
a. Review and Discussion of Proposed William Hilton Parkway Gateway Corridor
Master Plan
4. Public Comment - Non Agenda Items
5. Adjournment
FOIA Compliance: Public notification of this workshop has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 1 of 93
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Town Council
TO: Town Council
FROM: Shawn Gillen, Assistant Town Manager
VIA: Don D’Adam, Public Projects Director
Jeff Netzinger, Engineering Director
CC: Marc Orlando, ICMA-CM, Town Manager
Shawn Leininger, AICP, Deputy Town Manager
DATE: July 28, 2026
SUBJECT: William Hilton Parkway Gateway Corridor Master Plan Workshop
PURPOSE:
Town Council review updates to the proposed William Hilton Parkway Gateway Corridor
Master Plan.
BACKGROUND:
Since Town Council’s March 4, 2025, approval of the joint resolution with Beaufort County
regarding the project scope and funding strategy (Attachment 1), Town staff ha ve
advanced a proposed draft William Hilton Parkway Gateway Corridor Master Plan
(Attachment 2).
This work builds upon prior Town Council direction and reflects regional alignment,
incorporates stakeholder input, and integrates the community values previously
established by Town Council.
The proposed plan prioritizes safety, mobility, community compatibility, and gateway
aesthetics, while maintaining alignment with regional infrastructure investments.
Town Council reviewed the draft William Hilton Parkway Gateway Corridor Master Plan
at a workshop on April 28, 2026. Based on Town Council direction, Town staff have further
refined the draft plan. At the July 28, 2026, Workshop the following items will be reviewed:
1. Summary of the Refinements to the Master Plan Since We Last Met
2. Project Extent Bridge Project Overview
3. Project Objective, Guiding Principles, and Influences
4. Summary of Improvements
5. Jenkins Island Improvements
6. Stoney Neighborhood Improvements
Page 2 of 93
Page 2 of 2
a. Squire Pope Road / Chamberlin Drive Intersection
b. Wild Horse Road / Spanish Wells Road Intersection
7. Old Wild Horse Corridor Improvements
8. Analysis
a. Performance Matrix
b. Implementation Sequence
c. Additional Requests for SCDOT/Beaufort County
d. Projects Descriptions / Cost Estimates
e. Project Funding
f. Project Timeline
g. Additional Transportation System Improvement Projects
These refinements reflect prior Town Council guidance, incorporate regional coordination
and stakeholder input, and uphold the community values previously established by Town
Council. The proposed William Hilton Parkway Gateway Corridor Master Plan integrates
multimodal performance, economic impact, and environmental stewardship and creates
a successful corridor that delivers efficient, safe, and multimodal connections between
primary economic centers, while supporting the movement of people and freight.
NEXT STEPS:
Based on the direction of Town Council, Town staff will finalize the William Hilton Parkway
Gateway Corridor Master Plan for Town Council approval consideration at an upcoming
meeting.
ATTACHMENTS:
1. Adopted Joint Resolution of the Town of Hilton Head Island and Beaufort County
to Redefine the US278 Corridor Project
2. Draft William Hilton Parkway Gateway Corridor Master Plan
Page 3 of 93
RESOLUTION 2025/15
A JOINT RESOLUTION OF BEAUFORT COUNTY & TOWN OF HILTON HEAD
ISLAND TO REDEFIN'E. THE US 278 CORRIDOR PROJECT (ALSO KNOWN AS THE
WILLIAM HILTON PARKWAY GATEWAY CORRIDOR PROJECT) TO ALIGN WITH
THE AVAILABLE FUNDING
WHEREAS, the current proposed 278 Corridor Project (also known as the William Hilton
Parkway Gateway Corridor Project includes a bridge with a multi-use
pathway and roadway improvements spanning from Moss Creek Drive to Spanish Wells Road;
and
WHEREAS, any Funds expended from the 2018 Referendum as per the referendum will
solely be expended within the originally project area from Moss Creek Drive to Squire
Pope Road, and funds spent for improvements between Squire Pope Road and Spanish Wells Road
will be sourced solely from Local Impact Fee Revenue; and
WHEREAS, the current available funding for the Project totals $298.85 million,
consisting of $101 million from Beaufort County (sales tax and impact fees), $3.35 million from
the Town of Hilton Head Island donations), $74.5 million from the South Carolina
Department of Transportation (SCDOT), and $120 million from the State Infrastructure Bank
(SIB); and
WHEREAS, in February 2024, SCDOT provided an updated Project cost estimate,
increasing the projected Project cost from $305 million to $488 million; and
WHEREAS, this updated Project cost estimate was in our following quarterly
report to the SIB, and upon receipt, the SIB requested a meeting with the County to address the
project status and funding shortfall; and
WHEREAS, at a meeting on May 29, 2024, between SIB, SCDOT, state representatives,
and Beaufort County, the County proposed a pro-rata cost-sharing arrangement between SIB,
SCDOT, and the County to cover the $190 million Project funding shortfall; and
WHEREAS, in a letter to SIB dated July 3, 2024, the County formally requested
$90 million from SIB to match a $90 million contribution from the County, contingent upon voter
approval of a proposed Transportation Sales Tax Referendum in November 2024; and
WHEREAS, on November 5, 2024, the Transportation Sales Tax Referendum did not
receive voter approval thereby rendering the proposed match unavailable; and
WHEREAS, on November 7, 2024, SIB issued a letter to the County requesting a response
within 15 days regarding the plan to address the $190M Project funding shortfall; and
WHEREAS, at its November 12, 2024, County Council meeting, the Council voted not to
allocate additional funds to the Project; and
Attachment 1
Page 4 of 93
WHEREAS, in a letter to Beaufort County dated November 18, 2024, SCDOT reiterated
the deteriorating condition of the eastbound Mackay Creek Bridge, stating that its current condition
is rated a 4 out of 10, and emphasized that a decision on a viable project must be made by March
31, 2025, to proceed with construction by 2027; and
WHEREAS, at the November 20, 2024, SIB meeting, an extension was granted to
Beaufort County until March 31, 2025, for the County to provide a revised funding plan for the
Project; and
WHEREAS, on January .9, 2025, Senator Tom Davis, with support from the state
delegation, presented a proposal to the Project to match available funding; and
WHEREAS, SCDOT has provided six project options along with cost estimates for each
option, including the proposal endorsed by Senator Tom Davis; and
WHEREAS, only two of the six options, (excluding the standalone Mackay Creek Bridge
replacement) fall within the available $298.85 million budget; and
WHEREAS, a joint meeting of the Beaufort County Council and the Hilton Head Town,
Council was held on February 12, 2025, to discuss the options for the Project presented by SCDOT
and the funding for the Project.
WHEREAS, in a February 28, 2025, letter from South Carolina Secretary of
Transportation Justin Powell, to Senator Tom Davis, if the projected proceeds, SCDOT will make
it a Project and is willing to include in the procurement documents and in the
scoring of new proposals, a preference for alternatives that provide two way access, meaning one
can exit from the New Bridge heading eastbound onto Pinckney Island as well as depart
Pinckney island on to the New Bridge to head eastbound to Jenkins Island, rather than the current
plan to provide access to Pinckney island solely from Jenkins Island, a copy of which is
incorporated by reference and attached as Exhibit B.
NOW THEREFORE, BE IT RESOLVED THAT THE COUNTY COUNCIL OF
BEAUFORT COUNTY, SOUTH CAROLINA, AND THE TOWN COUNCIL OF THE
TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA, hereby adopt arevised scope for
the Project to align with the available The revised Project includes the following elements:
Revised Project Scope:
1. * Demolition of the existing eastbound bridge over Mackay Creek, construction of a new
bridge extending from the mainland to Jenkins Island and retaining the
existing two lane eastbound bridge over Skull Creek and the two existing two lane
westbound bridges over Mackay Creek and Skull Creek* Construction of the New Bridge
will be a three-lane eastbound lifeline bridge without a pathway.
2. *
Striping the New Bridge for two lanes, with only necessary road tieuins included.
3. Designing the New Bridge width to accommodate temporary four-lane use in the future if
westbound bridge replacement is required.
4. * The New Bridge will be designed so that there is a preference to provide two-way access
to and from Pinckney Island from the New Bridge over the use of the existing Skull Creek
Page 5 of 93
bridge, either the eastbound or westbound lanes being repurposed for two-way access to
Pinckney Island.
*
Construction of a Hog Island connector road/bridge to provide access to Cove,Blue Heron Point, and Hog Island, linking back to US 278 at the Windmill Harborintersection.
*
Retention and improvement of the Windmill Harbor signal with mast arms.The Town of Hilton Head Island and Beaufort County agree to work cooperatively on the
following:
i. Transfer the maintenance and repair responsibilities of the Windmill Harbor
Signal to the Town of Hilton Head Island. Funding for mast arms and installation of
adaptive technology consistent with that installed on existing Town of Hilton HeadIsland Signals will be eligible for the use of Reserve Funds if they remain at the end ofthe bridge project.
it. Explore providing a bike/pedestrian lane on the new eastbound bridge structure, as partof the built third lane, until the third lane is needed for operations.ili. Request that SCDOT reduce the speed limit of the William Hilton Parkway Corridorto 40mph.
\
*These project elements are in attached as Exhibit A.
Funding Elements:
Funding Source Amount (in millions)Current Project Funding (SIB, DOT, Local) $295.50M
Additional SCDOT Funding (DOT, Local) $ 16.10 M
to Date (DOT,_LocalL_ S 13.07 MTotal Available Funding $298.53M
Planned Project Costs Amount (in millions)Revised Project Costs (SIB, DOT, Local) $257.70M
Remaining Engineering Costs (DOT, Local) $ 15.00M
Reserve Funds(Local) $ 14.33M
PSD Relocation Funds (Local) $ 6.50M
,Stoney Historic Cornnnmity SafeatLProjectsJLocal) $ 5.00M
Total Costs $298.53M
Use of Local Funds:
1. Reserve Funds will cover potential project overruns.
2, The Project will fund the replacement of the 24" waterline up to the limits inState Act 36, plus the allocated $6.5 million in Local Funds Costs for the waterline relocation not covered by combination of State Act 36 and Local Funds will befunded using Reserve Funds as the top priority.
3. To address immediate safety concerns in the Stoney Historic Community, a minimum of$5.0 million in Local Funds will be set aside and reserved for a local road project, withfunds made available upon approval of the Project by the Federal HighwayAdministration, with the Town overseeing design and construction, prioritized as follows:i. Squire Pope intersection enhancements (pedestrian safety, turn movements, etc.)ii. Sidewalk enhancements
Page 6 of 93
Adopted this 10th day of March 2025.
ATTEST;
ngaAw EMA
Adopted this 4th day of March 2025.
ATTEST:
'
berly Gammon, Clerk to Council
COUNTY COUNCIL OF BEAUFORT COUNTY
Alice Howard, Chair
HILTON HEAD ISLAND TOWN COUNCIL
Page 7 of 93
Retain existing 2-lane Weskbound as-is
/
$13
\_
Retain 2-lane Westbound
Page 8 of 93
EXHIBIT B
Justin P. Powell
Secretan/ of Transportation
South Carolina 808-737-0874 I 803-7372038 Fax
Department of Transportation
February 28, 2025
The Honorable Tom Davis
South Carolina Senate
203 Gressette Building
Columbia, SC 29201
Dear Senator Davis:
As you are aware, Beaufort County and the Town of Hilton Head Island are in discussions about revising the
US-278 Bridge project into a smaller project focused on the eastbound approach from Bluffton onto Hilton
Head Island.
The South Carolina Department of Transportation (SCDOT) has developed an alternative to build a single
span across Mackay Creek and Skull Creek. While designed forfuture capacity, the structure would be striped
fortwo lanes and would tie into the existing once on Hilton Head Island. This approach would address
SCDOT concerns about the US-278 eastbound bridge over Mackay Creek and advance a project that
facilitates the long~term plan to reconstruct all four bridges onto the island,
Consistent with the original proposal for the full bridge, the revised plan would aim to reduce the environmental
impacts to the Pinckney Island National Wildlife Refuge by not having the structure touch down on the island.
Given the budgetary constraints of funds available from Beaufort County, the State Infrastructure Bank, and
SCDOT, the current plan has public access to Pinckney Island solely from Hilton Head Island. Full access to
Bluffton from Pinckney Island would be established in the future when the westbound structures are replaced.
I recognize the concern about vehicles traveling from Bluffton to Pinckney Island will now be required to
travel to Hilton Head Island first. To that end, I want to offerthe following:
1) It the revised project proceeds, SCDOT will make it a build" project. In that process, SCDOT
will select a joint design and construction team to finalize plans on the project and build the bridge,
2) The design build process promotes innovation and allows teams to propose alternatives that can
improve the project. This could include proposing new ways to access Pinckney Island than currently
contemplated.
3) SCDOT is willing to include in the procurement documents and in the scoring of the proposals from
the teams a preference for alternatives that provide two-way access onto Pinckney Island than the
current plan to provide access solelytrom Hilton Head Island.
This approach will allow the project to proceed on its current budget and provide an opportunity to apply
additional innovation to the project that could resolve access concerns to Pinckney Island.
Please do not hesitate to reach out if I can be of further assistance,
Sincerely,
W
Justin P. Powell
Secre ary of Transportation
CC: Beaufort County Legislative Delegation
SCDOT Commission
www.scdot.org
An Equal Opportunity
Affirmative Action Employer
(8554672368)
Post Office Box 191
955 Park Street, Fioom 309
Columbia, SC 29202-0191
Page 9 of 93
William Hilton Parkway
Gateway Corridor Master Plan
TOWN OF HILTON HEAD ISLAND // JULY 28, 2026
DRAFT
Attachment 2
Page 10 of 93
page 03
page 04
page 08
page 21
page 22
page 26
page 49
page 53
| TABLE OF CONTENTS
Since We Last Met
Project Extent Bridge Project Overview
Project Objective + Guiding Principles + Influences
Summary of Improvements
Jenkins Island Improvements
Stoney Neighborhood Improvements
-Squire Pope Road / Chamberlin Drive Intersection
-Wild Horse Road / Spanish Wells Road Intersection
Old Wild Horse Corridor Improvements
Analysis
-Performance Matrix
-Implementation Sequence
-Additional Requests for SCDOT/Beaufort County
-Projects Descriptions / Cost Estimates
-Project Funding
-Project Timeline
-Additional Transportation System Improvement Projects
Page 11 of 93
| SINCE WE LAST MET
Safety and Operations Clarity
• Updated traffic projections using latest
2025 SCDOT data
• Added Squire Pope movement diagrams
and intersection analysis
• Finalized traffic simulation modeling
• Reinforced proposed 40 MPH speed limit
• Prioritized dangerous intersections
within implementation sequencing
Outreach + Property Impact Study
• Reinforced direct access to/from WHP
for Stewart properties and proposed
pedestrian bridge crossing
• Confirmed no right-of-way impacts to
privately held properties, including the
Humane Association and the Stewart
family
• Acknowledged additional corridor needs
outside the study scope (Gum Tree, CIP
Merge, Wilborn, etc.)
Implementation Clarity
• Reviewed and further separated project
components to clarify costs
• Provided funding strategy overview
• Improved overall project documentation
and presentation materials
3
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 12 of 93
Skull Creek
Mackay Creek
278
| PROJECT EXTENT + KEY ZONES
4
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Jenkins Island
Stoney Historic
Neighborhood CorridorCounty Bridge Project Extent
By BC/SCDOT
WHP Gateway Corridor Project Extent
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
Page 13 of 93
278
• Implement adaptive signal upgrades on US
Highway 278 to Interstate 95
• Design corridor enhancements from Moss
Creek to Mackay Creek Bridge
• Mitigate conditions of former gas station site
• Upgrade to adaptive signal systems on Bluffton
Parkway
• Relocate Pinckney Island Ferry Embarkation
OFF-ISLAND / WESTERN GATEWAY
1
2
3
4
5
31 2
4
5
Skull Creek
Mackay Creek
| BRIDGE PROJECT OVERVIEW
County Bridge Project Extent
By BC/SCDOT
5
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
Page 14 of 93
| BRIDGE PROJECT OVERVIEW
Future
New Off-Island Bridge
New Bridge
(3 Lane Capacity)
New Bridge
(3 Lane Capacity)
New Bridge
(3 Lane Capacity)
Today
Existing Bridges
Bridge at end
of life span
Westbound
Westbound
Eastbound
Eastbound
Near-term
New On-Island Bridge
Westbound
Westbound
DemolishedDemolished
Demolished
Eastbound
Eastbound
Eastbound
Eastbound
Eastbound
Eastbound (Future)
Westbound
Westbound
Westbound
6
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Existing R/W Existing R/W Existing R/W
Existing R/W Existing R/W Existing R/W
Page 15 of 93
OBJECTIVE:
Develop a comprehensive William Hilton Parkway
Gateway Corridor Master Plan that will define the
future of U.S. 278 from the Moss Creek western
limits of the island through the historic Stoney
Community and across the island’s main gateway
CONSULTANT TEAM ROLE:
Use local knowledge to create community-
based solutions that enhance safety, community
preservation, and character
| MASTER PLAN OBJECTIVE
7
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 16 of 93
| CORRIDOR GUIDING PRINCIPLES
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
8
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
US 278 AT WILD HORSE ROAD / SPANISH WELLS ROAD
US 278 AT SQUIRE POPE ROAD / CHAMBERLIN DRIVE US 278 IN THE STONEY NEIGHBORHOOD
Page 17 of 93
| CORRIDOR GUIDING PRINCIPLES
Improve safety and quality of life for the
residents /neighborhoods / businesses directly
impacted by the corridor improvements
2
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
9
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
ESTABLISH A TRUE PARKWAY
ENHANCE PEDESTRIAN FACILITIES HONOR + CELEBRATE GULLAH GEECHEE CULTURE
Page 18 of 93
| CORRIDOR GUIDING PRINCIPLES
Create a gateway to Hilton Head Island that
the region will be proud of3
Improve safety and quality of life for the
residents /neighborhoods / businesses directly
impacted by the corridor improvements
2
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
10
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
CELEBRATE THE SALT MARSH AND ARRIVING ON THE ISLAND
CREATE NEW PUBLIC SPACE PRESERVE LOWCOUNTRY CHARACTER
Page 19 of 93
Create a gateway to Hilton Head Island that
the region will be proud of
Improve hurricane / emergency
evacuation route
34
| CORRIDOR GUIDING PRINCIPLES
Improve safety and quality of life for the
residents /neighborhoods / businesses directly
impacted by the corridor improvements
2
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
11
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 20 of 93
| WHAT DEFINES A SUCCESSFUL CORRIDOR?
SCDOT defines a successful corridor as one that delivers
efficient, safe, and multimodal connections between
primary economic centers, while supporting the movement
of people and freight.
A successful corridor is not just about road capacity—it’s
about integrated multimodal performance, economic
impact, and environmental stewardship.
SCDOT INTERPRETATION
12
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 21 of 93
| WHAT DEFINES A SUCCESSFUL CORRIDOR?
Efficient connections: Provide reliable, high-quality links between major economic
hubs, enabling seamless travel and trade.
Economic vitality: Enhance South Carolina’s competitiveness by creating an
interconnected, intermodal network for freight and goods.
Safety and security: Maintain a safe, secure, and efficient transportation system.
Resource protection: Protect and enhance natural, historical, and cultural
resources along the corridor.
• Intersection, Approach, Movement Delay and Level of Service
• Collision Severity
• Crash Causational Factors
• Conflict Point Reduction
• Geometric Continuity
• Multimodal Accommodations
SCDOT CORE GOALS FOR A SUCESSFUL CORRIDOR
KEY METRICS FOR SCDOT
13
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 22 of 93
278
278
Skull Creek
Mackay Creek
| 2024 SCDOT AVERAGE ANNUAL DAILY TRAFFIC VOLUMES
19,100
57,100
62,200
5,500
31,200
2,500
WHP Gateway Corridor Project Extent
50,400
7,100
32,900
10,600
278
14
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
*Average vehicles per day
both directions
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Page 23 of 93
Spanish Wells RdSpanish Wells Rd
Wild Horse RdWild Horse Rd Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
| 2024 SCDOT AVERAGE ANNUAL DAILY TRAFFIC VOLUMES
51.3%
48.7%
• Traffic trends show an increasing use
of the Cross Island Parkway with the
removal of the toll in 2021
• Traffic volumes are near balanced
between William Hilton Parkway and the
Cross Island Parkway
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
2010 2012 2014 2016 2018 2020 2022 2024 2026
Average Daily Traffic Volumes -2011 - 2024
WHP Cross Island
278
WHP Gateway Corridor Project Extent
15
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
HONEY HORN HONEY HORN
PLANTATIONPLANTATION
Page 24 of 93
| PROJECT INFLUENCES - TRAFFIC SAFETY
WHP Gateway Corridor Project Extent
16
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Most
Frequent
Least
Frequent
WHP GATEWAY CORRIDOR TRAFFIC COLLISIONS (2016-2024)
• Total Collisions - 1,108
• Total Fatalities - 6 (2 involving pedestrians)
• Total Major Injuries - 81
• Collisions at WHP/Squire Pope Rd & WHP/Wild Horse Rd
intersections make up more than 40% of all collisions
Skull Creek
Mackay Creek
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
Page 25 of 93
| INTERSECTION ASSESSMENT - SQUIRE POPE ROAD / CHAMBERLIN DRIVE
2016–2024 Traffic Data
| INTERSECTION ASSESSMENT – SQUIRE POPE ROAD / CHAMBERLIN DRIVE
1
5 16
24
104
Severity
Minor Injury
Possible Injury
No Injury
Fatal
Serious Injury
• 50% of the reported crashes at the intersection
are rear end crashes
• Angle crashes, typically a left-turn and through
movement conflict, make up 32% of the total
crash types
• The top three probable causes for crashes at
the intersection are
• Distracted/Inattention (27%)
• Failure to Yield ROW (24%)
• Driving too fast for conditions (23%)
Severity of Collision
Angle Head On Non Collision Rear
End
Sideswipe, Same
Direction Grand Total
Fatal 1 1
Serious Injury 3 1 1 5
Minor Injury 9 3 4 16
Possible Injury 14 10 24
No Injury 21 7 61 15 104
Grand Total 48 4 8 75 15 150
17
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 26 of 93
| INTERSECTION ASSESSMENT - SQUIRE POPE ROAD / CHAMBERLIN DRIVE
| INTERSECTION ASSESSMENT – SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Squire Pope Rd
Chamberlin Dr
2025 EXISTING
CONFIGURATION
LEVEL OF SERVICE
(10) 1
(29) 2
(6) 5
200 (257)
0 (3)
48 (57)
(141) 190
(1,938) 2,634
(36) 3
36 (74)
1,256 (2,629)
3 (6)
Squire Pope Rd
Chamberlin Dr
2025 AM & (PM) TURNING
MOVEMENT VOLUMES
Squire Pope Rd
Chamberlin Dr
Continuous Green T
Configuration
2030 LEVEL OF SERVICE
Traffic Level of Service (LOS) is a
standardized metric used by
transportation engineers to evaluate
and communicate road congestion,
travel time delay, and driver
maneuverability.
Traffic engineers use Turning Movement
Counts (TMCs) to quantify exactly how
many vehicles, pedestrians, and cyclists
enter, exit, and turn at intersections. This
data is essential for designing safe
roadways, optimizing traffic signals,
managing congestion, and evaluating
the need for new traffic control devices
18
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 27 of 93
| INTERSECTION ASSESSMENT - SPANISH WELLS ROAD / WILD HORSE ROAD
2016–2024 Traffic Data
| INTERSECTION ASSESSMENT – SPANISH WELLS ROAD / WILD HORSE ROAD
2 1
11
21
99
Severity
Minor Injury
Possible Injury
No Injury
Fatal
Serious Injury
• 47% of the reported crashes at the intersection
are rear end crashes
• Angle crashes, typically a left-turn and through
movement conflict, make up 28% of the total
crash types
• The top three probable causes for crashes at the
intersection are
• Distracted/Inattention (27%)
• Failure to Yield ROW (24%)
• Driving too fast for conditions (23%)
Severity of Collision
Angle Head On Non-Collision Rear End Sideswipe, Same
Direction Unknown Grand
Total
Fatal 2 2
Serious Injury 1 1
Minor Injury 7 1 2 1 11
Possible Injury 7 3 1 9 1 21
No Injury 23 1 6 52 16 1 99
Grand Total 37 4 11 63 18 1 134
19
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 28 of 93
| INTERSECTION ASSESSMENT - SPANISH WELLS ROAD / WILD HORSE ROAD
| INTERSECTION ASSESSMENT – SPANISH WELLS ROAD / WILD HORSE ROAD
Wild Hoes Rd
Spanish Wells Rd
Wild Horse Rd
Spanish Wells Rd
2025 AM & (PM) TURNING
MOVEMENT VOLUMES
Wild Horse Rd
Spanish Wells Rd
Dual Left-Turn
Configuration
(176) 109
(42) 42
(71) 93
9 (18)
48 (58)
102 (79)
(63) 60
(1,759) 2,439
(150) 143
45 (113)
1,163 (2,397)
48 (56)
Traffic Level of Service (LOS) is a
standardized metric used by
transportation engineers to evaluate
and communicate road congestion,
travel time delay, and driver
maneuverability.
Traffic engineers use Turning Movement
Counts (TMCs) to quantify exactly how
many vehicles, pedestrians, and cyclists
enter, exit, and turn at intersections. This
data is essential for designing safe
roadways, optimizing traffic signals,
managing congestion, and evaluating
the need for new traffic control devices
2025 EXISTING
CONFIGURATION
LEVEL OF SERVICE
20
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 29 of 93
| SUMMARY OF IMPROVEMENTS
Enhance pedestrian pathways and create
better connectivity in corridor
Provide streetscape improvements
(landscape, medians, grading, signage, art)
Improve level of service and vehicular
thru-put at problematic intersections with
posted speed reduced to 40 mph
Reconfigure Wild Horse Road / Spanish Wells
Road intersection to support continuous
on-island traffic flow
Reconfigure Squire Pope Road / Chamberlin
Drive intersection to support continuous
on-island traffic flow
Establish Gullah Geechee Heritage Park
Construct additional eastbound travel lane
Construct additional westbound travel lane
Page 30 of 93
JENKINS ISLAND
Page 31 of 93
Skull Creek
Mackay Creek
| JENKINS ISLAND KEY MAP
278
Jenkins Island
County Bridge Project Extent
By BC/SCDOT
23
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
Page 32 of 93
0
N
200'
300'
100'
PLANSCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
| JENKINS ISLAND - ROADWAY IMPROVEMENTS
Windmill Harbour
Harbor RV Resort
Hog Island
278
278
C Heinrichs Cir
Utility Corridor
Jenkins Rd
Hilton Head PSD #1
Jenkins Island Cemetery
Crosstree Dr
24
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Existing bridge alignment
Future bridge
alignment, by BC/SCDOT
New intersection mast arm Expanded median planting, convert
Jenkins Road to right-in right out
Access road and pathway
connection to Jenkins Road
(1) new eastbound lane, (1)
westbound lane in future phase
Access road and pathway connection
to Hog Island, by BC/SCDOT
Hilton Head Harbor Marina
Town Owned Property
Beaufort County Property
Beaufort County Property
Page 33 of 93
0
N
200'
300'
100'
PLANSCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
278
| JENKINS ISLAND - PEDESTRIAN IMPROVEMENTS
Jenkins Island Cemetery
Windmill Harbour
Harbor RV Resort
Hog Island
Hilton Head PSD #1
Hilton Head Harbor Marina
Landscape improvements between
bridge abutment and Windmill Harbour
278
278
C Heinrichs Cir
Utility Corridor
Jenkins Rd
Crosstree Dr
25
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Pathway connection under bridge
New pedestrian crossing
on south side of intersection
Trail-head park with parking and vehicular
access to Jenkins Island Cemetery
Pathways connecting Jenkins Island
to Stoney Historic Neighborhood
Town Owned Property
Beaufort County Property
Beaufort County Property
Page 34 of 93
STONEY HISTORIC
NEIGHBORHOOD CORRIDOR
Page 35 of 93
Skull Creek
Mackay Creek
278
| STONEY HISTORIC NEIGHBORHOOD KEY MAP
Jenkins Island
County Bridge Project Extent
By BC/SCDOT
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
27
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Stoney Historic
Neighborhood Corridor
Page 36 of 93
0
N
200'
300'
100'
PLAN
SCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
| STONEY HISTORIC NEIGHBORHOOD - ROADWAY IMPROVEMENTS
278
28
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
WHP fly-over
Expanded median planting
Extension of Chamberlin Drive to Old Schoolhouse Park with new
connections to private parcels + Adrianna Lane access removed
Reconfigure intersection
to Continuous Green-T
(1) new eastbound lane, (1)
westbound lane in future phase
Streetscape enhancements
on Old Wild Horse Road
Potential future
Northpoint connection
The Crazy Crab
Parkers
Tin and Tallow
GGHNCDC
Headquarters
GGHNCDC
future use
Fairfield Station
Connector between Wild Horse
Road and Old Wild Horse Road
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
Hilton Head Humane
Association
Humane Way
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
SCDOT
Extension of Chamberlin Drive to Humane Way + improvements
to Humane Way to connect to Spanish Wells Road
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Note: No right-of-way acquisition required in Stoney Historic
Neighborhood with proposed roadway improvements
Page 37 of 93
0
N
200'
300'
100'
PLAN
SCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
| STONEY HISTORIC NEIGHBORHOOD - PEDESTRIAN IMPROVEMENTS
278
29
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
The Crazy Crab
Parkers
Tin and Tallow
GGHNCDC
Headquarters
GGHNCDC
future use
New pedestrian bridge over WHP connecting
north Stoney to new Gullah Geechee Heritage Park
Additional park-space showcasing
Gullah Geechee heritage
New sidewalks on
Old Wild Horse Road
Fairfield Station
Humane Way
Pathways connecting
Jenkins Island to Stoney
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Hilton Head Humane
Association
SCDOT
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
Note: No right-of-way acquisition required in Stoney Historic
Neighborhood with proposed roadway improvements
Page 38 of 93
| STONEY HISTORIC NEIGHBORHOOD - ENLARGED PLAN
278
0
N
200'
300'
100'
PLAN
SCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
30
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
The Crazy Crab
GGHNCDC
Headquarters
Property access maintained by Stewart family
Old Schoolhouse
Park
278
Squire Pope Road
Chamberlin Drive
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
Note: No right-of-way acquisition required in Stoney Historic
Neighborhood with proposed roadway improvements
Page 39 of 93
SQUIRE POPE ROAD / CHAMBERLIN DRIVE
INTERSECTION ENLARGEMENT
Page 40 of 93
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Continuous Green-T
32
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Continuous flow for
eastbound traffic
New pedestrian bridge for
north-south connection
Closure of thru-movement between Chamberlin Drive and
Squire Pope Road; right-in, right-out only from Chamberlin Drive
and timed left turns from Squire Pope Road at peak hours
Squire Pope RdSquire Pope Rd
Chamberlin Drive Chamberlin Drive
New connection into Old Schoolhouse Park
and future Gullah Geechee Heritage Park
GREEN SHANI
MAIA
GREENBERGKING
LLC
LAM HUONG
THI
DRIESSEN
ALICE R.
PENA ADRIENNE
WASHINGTON WASHINGTON
ALYSIA T SAM DAVID GEORG
WRIGHT BETTY
MAULDIN EVELENA
WILLIAMS RUBY
SIMMONS DESAREE
WASHINGTON
AMANDA
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
GGHNCDC
HEADQUARTERS
PERRY
CLARENCE II
278
Page 41 of 93
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Continuous Green-T
33
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Squire Pope Road
Chamberlin Drive
278
Page 42 of 93
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Continuous Green-T: Signal Operations
Adaptive 3-Phase Signal Operation
Phase 1: Major Road Left-Turn Yield / Opposing Through
(Continuous Flow)
In this phase, traffic in one major-road direction continues
straight through uninterrupted (often signaled by a green
through arrow). Drivers turning left from the opposite major-
road direction are given a protected or protected-permissive
green arrow to safely cross the continuous flow.
34
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
278
Squire Pope Road
Chamberlin Drive
Page 43 of 93
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Continuous Green-T: Signal Operations
Adaptive 3-Phase Signal Operation
Phase 1: Major Road Left-Turn Yield / Opposing Through
(Continuous Flow)
In this phase, traffic in one major-road direction continues
straight through uninterrupted (often signaled by a green
through arrow). Drivers turning left from the opposite major-
road direction are given a protected or protected-permissive
green arrow to safely cross the continuous flow.
35
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
278
Squire Pope Road
Chamberlin Drive
Page 44 of 93
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Continuous Green-T: Signal Operations
Adaptive 3-Phase Signal Operation
Phase 1: Major Road Left-Turn Yield / Opposing Through
(Continuous Flow)
In this phase, traffic in one major-road direction continues
straight through uninterrupted (often signaled by a green
through arrow). Drivers turning left from the opposite major-
road direction are given a protected or protected-permissive
green arrow to safely cross the continuous flow.
Phase 2: Side-Street Right Turn (Continuous Flow)
Traffic moving in the continuous major-road direction still
flows uninterrupted. Minor road vehicles turning right onto
the major road do so via a yield-controlled lane.
36
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Squire Pope Road
Chamberlin Drive
278
Page 45 of 93
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Continuous Green-T: Signal Operations
Adaptive 3-Phase Signal Operation
Phase 1: Major Road Left-Turn Yield / Opposing Through
(Continuous Flow)
In this phase, traffic in one major-road direction continues
straight through uninterrupted (often signaled by a green
through arrow). Drivers turning left from the opposite major-
road direction are given a protected or protected-permissive
green arrow to safely cross the continuous flow.
Phase 2: Side-Street Right Turn (Continuous Flow)
Traffic moving in the continuous major-road direction still
flows uninterrupted. Minor road vehicles turning right onto
the major road do so via a yield-controlled lane.
Phase 3: Side-Street Left Turn & Major Road Stopping
When side-street left-turning vehicles or pedestrian phases
are activated, the major road’s continuous direction receives
a red light to stop traffic. Vehicles turning left from the side
street are given a green arrow to merge onto the major road,
while traffic on the opposing major approach is also serviced
37
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
278
Squire Pope Road
Chamberlin Drive
Page 46 of 93
38
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
• Safety Performance: Reduces overall crashes, including serious
injury and fatal crashes, by minimizing stop-and-go traffic on the main
roadway.
• Target Crashes: Helps reduce common crash types such as angle and
rear-end collisions.
• Potential Risks: Special accommodations are needed to safely cross
free-flow lanes, such as pedestrian bridges or underpasses.
• Operational Benefits: Improves operations by reducing delays and
shortening travel times.
• Considerations: Most effective at three-leg intersections with heavy
through traffic, low side-street turning volumes, and limited pedestrian
activity. Proper site selection and design are essential.
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Continuous Green-T: Takeaways
Page 47 of 93
39
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Traffic Simulation
CLICK HER TO
VIEW
EXISTING
CONDITIONS
CLICK HERE
TO VIEW THE
PROPOSED
CONDITIONS
Note: Roadway layout of traffic
simulation model reflects the
function and vehicle movements
of the proposed master plan but
looks different from the actual
design. This is a normal function
of the software that simplifies
certain design elements for sake
of traffic analysis accuracy and
communication clarity.
https://vimeo.com/1211733544/6d639bdf32 https://vimeo.com/1211733545/88ae3ee738
If you are having difficulty opening the video link, please copy and paste the URL into your web browser.
Page 48 of 93
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Additional Improvements
40
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Squire Pope R
oad
Chamberlin Drive
278
Page 49 of 93
| PEDESTRIAN BRIDGE PRECEDENTS
41
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 50 of 93
SPANISH WELLS ROAD / WILD HORSE ROAD
INTERSECTION ENLARGEMENT
Page 51 of 93
| SPANISH WELLS ROAD /WILD HORSE ROAD
Baseline Improvements
New right turn lane +
designated thru-lane
Access to properties
maintained
New right turn lane +
designated thru-lane
43
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
ATLAS
SHRUGGED LLC
SCDOT
TIBERIUS HHI LLC
New Pathway crossing
Spanish Wells Road Spanish Wells Road
Wild Horse Road Wild Horse Road
New pathway into Old Schoolhouse Park +
future Gullah Geechee Heritage Park
Old Schoolhouse Park
Town Owned Property
Additional left turn lane
TIN AND TALLOW
PARKERS
278
Page 52 of 93
| SPANISH WELLS ROAD /WILD HORSE ROAD
Baseline Improvements
44
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Spanish Wells Road
Wild Horse Road
278
Page 53 of 93
| SPANISH WELLS ROAD /WILD HORSE ROAD
Fly-over (Hybrid Cloverleaf Configuration)
Access roads to utilize
existing roadway alignments
Bridge with pathway
connection over WHP
Connection to Wild Horse Road
Connection to Spanish Wells Road
Extension of Chamberlin Drive to
Humane Way + improvements to Humane
Way to connect to Spanish Wells Road
Connector between Wild Horse
Road and Old Wild Horse Road
Potential future
Northpoint connection
45
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
CANNICK
LEANDER (LIFE
ESTATE) JR
DKD
REALITY INC
SPURLING
MARK
SCDOT
CTG RENTALS
LLC
FAIRFIELD
HORIZONTAL
PROPERTY
OWNERS REGIME
TIBERIUS
HHI LLC
Spanish Wells RoadSpanish Wells Road
Humane WayHumane Way
Wild Horse RoadWild Horse Road
Old Wild Horse Road Old Wild Horse Road
Old Schoolhouse Park
JENKINS
ESQUIVEL &
FUENTES LLC
ROSA LEE
DRIESSEN TRUST
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
TIN AND TALLOW
HILTON HEAD HUMANE ASSOCIATION
PARKERS
278
Page 54 of 93
| SPANISH WELLS ROAD /WILD HORSE ROAD
Fly-over (Hybrid Cloverleaf Configuration)
46
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Spanish Wells Road
Humane Way
Wild Horse Road
278
Page 55 of 93
| SPANISH WELLS ROAD /WILD HORSE ROAD
Traffic Simulations
CLICK HERE
TO VIEW
EXISTING
CONDITIONS
CLICK HERE
TO VIEW
PROPOSED
CONDITIONS
47
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Note: Roadway layout of traffic
simulation model reflects the
function and vehicle movements of
the proposed master plan but looks
different from the actual design. This
is a normal function of the software
that simplifies certain design
elements for sake of traffic analysis
accuracy and communication clarity.
https://vimeo.com/1211734754/4fcd488c2c https://vimeo.com/1211734753/20311954a5
If you are having difficulty opening the video link, please copy and paste the URL into your web browser.
Page 56 of 93
| FLY-THROUGH ANIMATION
LINK
https://vimeo.com/1194130909/c3f0588290?share=copy&fl=sv&fe=ci
If you are having trouble opening the link to the
video please copy and paste the URL above into
your web browser.
Page 57 of 93
OLD WILD HORSE ROAD
CORRIDOR IMPROVEMENTS
Page 58 of 93
| OLD WILD HORSE ROAD - DESIGN VISION
50
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Provide curb & gutter in-lieu of drainage ditch
Provide pathway connectivity on east side
of roadway to better serve businesses
Eliminate pathway inconsistencies Provide planting to improve aesthetic
Page 59 of 93
| OLD WILD HORSE ROAD - DESIGN VISION
51
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
New sidewalk, to meander where possible
Planted tree lawn buffer
New curb and gutter
Page 60 of 93
65'-0" FT RW
DRIVE
12'-0"
DRIVE
12'-0"
PATHWAY
8'-0"
DRAINAGE
+/-8'-0"
DRAINAGE
+/-25'-0"
65'-0" FT RW
DRIVE
10'-0"
DRIVE
10'-0"
PATHWAY
8'-0"
PLANTED
+/-8'-0"
PATHWAY
+/-8'-0"
2'-0" CURB + GUTTER
PLANTED
+/-8'-0"
TREE LAWN
+/-8'-0"
65'-0" FT RW
DRIVE
12'-0"
DRIVE
12'-0"
PATHWAY
8'-0"
DRAINAGE
+/-8'-0"
DRAINAGE
+/-25'-0"
65'-0" FT RW
DRIVE
10'-0"
DRIVE
10'-0"
PATHWAY
8'-0"
PLANTED
+/-8'-0"
PATHWAY
+/-8'-0"
2'-0" CURB + GUTTER
PLANTED
+/-8'-0"
TREE LAWN
+/-8'-0"
| OLD WILD HORSE ROAD - DESIGN VISION
PROPOSED STREET SECTION
EXISTING STREET SECTION
52
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 61 of 93
ANALYSIS
Page 62 of 93
| WILLIAM HILTON PARKWAY GATEWAY CORRIDOR MASTER PLAN
54
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
Page 63 of 93
Create a gateway to Hilton Head Island that
the region will be proud of
Improve hurricane / emergency
evacuation route
3
4
| COMMUNITY GENERATED GOALS OF CORRIDORS
Improve safety and quality of life for the
residents /neighborhoods / businesses directly
impacted by the corridor improvements
2
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
55
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 64 of 93
| PERFORMANCE MATRIX
ELEMENT PERFORMANCE OPERATIONAL BENEFIT
3
3
8
4
8
8
4
2
9
Additional eastbound travel lane
(From bridge to Squire Pope Road)
Additional westbound travel lane
(From Squire Pope Road to Bridge)
Eastbound Continuous Green-T at
Squire Pope Rd / Chamberlin Dr
intersection + pedestrian bridge
Baseline improvements at
Spanish Wells Rd / Wild Horse Rd
intersection
Fly-over bridge at Spanish Wells
Rd / Wild Horse Rd intersection
INTERSECTION CORRIDOR
Reduces congestion during the AM peak hours. Delay for the
eastbound and side street movements will also be reduced
Reduces congestion during the PM peak hours. Delay for the
westbound and side street movements will also be reduced
Reduces WHP delay by creating continuous eastbound
movement. Reduces delay for westbound by removing frequency
of signal stops.
Provides congestion relief for the Spanish Wells Road and Wild
Horse Road approaches. WHP will see limited benefit from this
improvement.
WHP will benefit significantly as the majority of through-put
delay will be removed for eastbound movements. Westbound
delay will improve but will be controlled by future bridge
performance and other improvements to US 278
100 5
LITTLE CONGESTION RELIEF MODERATE CONGESTION RELIEF NO CONGESTION
10
Page 65 of 93
| PROJECTS
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
Project G
PROJECT C
Project K
Project I
Project E
PROJECT D
Project D
PROJECT E
Project H
PROJECT F
Project J
PROJECT G
Project L
PROJECT H
PROJECT I
PROJECT J
PROJECT K
PROJECT L
57
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
Page 66 of 93
PROJECT DESCRIPTION ESTIMATED COST *
$125,800,000SUB TOTAL
$4,300,000PROJECT A
(INTERSECTION - SHORT TERM IMPROVEMENT)
Implement baseline improvements at Spanish Wells Road and Wild
Horse Road intersection
$900,000PROJECT B
(INTERSECTION - SHORT TERM IMPROVEMENT)
Implement Eastbound Continuous Green-T at Squire Pope Road /
Chamberlin Drive intersection
$14,100,000PROJECT C
(INTERSECTION + PATHWAY IMPROVEMENTS)
Construct pedestrian bridge west of Squire Pope Road / Chamberlin
Drive intersection
$36,100,000PROJECT D
(INTERSECTIONS - LONG TERM IMPROVEMENT)
Construct Fly-over Bridge at Spanish Wells Road / Wild Horse Road
intersection including new roundabouts
$3,600,000PROJECT F
(ROAD CONNECTION)
Extend Chamberlin Drive to connect with Spanish Wells
$20,200,000PROJECT K
(ROAD EXPANSION)
Construct an additional eastbound travel lane from bridge to Squire
Pope Road / Chamberlin Drive intersection
$1,100,000PROJECT E
(INTERSECTION - SHORT TERM IMPROVEMENT)
Implement intersection improvements at Crosstree Drive / C Heinrichs
Circle (Windmill Harbour entrance)
$16,600,000PROJECT I
(PATHWAY IMPROVEMENTS)
Implement corridor pathway, landscape, wayfinding, placemaking
improvements
$4,700,000PROJECT H
(STREETSCAPE IMPROVEMENT)
Implement Old Wild Horse Road streetscape enhancements
$8,100,000PROJECT J
(INTERSECTIONS - LONG TERM IMPROVEMENT)
Construct Jenkins Island access road, parking lots, cemetery
improvements
$13,600,000PROJECT L
(ROAD EXPANSION)
Construct additional westbound travel lane from Squire Pope /
Chamberlin intersection to bridge
| PROJECTS OVERVIEW
*Estimated costs based on 2025 estimates
$2,500,000PROJECT G
(PARK IMPROVEMENT)
Develop Gullah Geechee Heritage Park
Page 67 of 93
| SCDOT/BC PROJECT
SCDOT
SCDOT / BC
59
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbour
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 68 of 93
| PROJECT A ELEMENT COMPONENTS ESTIMATED COST
$4,300,000Baseline Improvements at Spanish
Wells / Wild Horse intersection
• Additional pavement / turn
lane capacity
• Curb & gutter & drainage
• Pavement markings
• Landscaping
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
60
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbour
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 69 of 93
ELEMENT COMPONENTS ESTIMATED COST
$900,000Eastbound Continuous Green-T
at Squire Pope / Chamberlin
Intersection
• Additional pavement / turn
lane capacity
• Raised concrete medians
• Pavement markings
• Curb & gutter & drainage
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
| PROJECT B
SCDOT
SCDOT / BC
PROJECT A
Project A
PROJECT B Project B
61
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Windmill Harbour
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 70 of 93
| PROJECT C ELEMENT COMPONENTS ESTIMATED COST
$14,100,000Pedestrian Bridge west of Squire
Pope / Chamberlin Drive
• 750’ bridge with decorative
handrails, lighting & finishes
• Deep foundations
• Steel superstructure
• Concrete deck
• Lanscaping & signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
PROJECT C
62
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbour
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 71 of 93
| PROJECT D
ELEMENT COMPONENTS ESTIMATED COST
$36,100,000Fly-over bridge at Spanish Wells /
Wild Horse intersection
• Bridge with pathway,
handrails & lighting
• MSE walls
• Concrete retaining walls
• Curb & gutter & drainage
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
PROJECT C
PROJECT D
Project D
63
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbour
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 72 of 93
| PROJECT E ELEMENT COMPONENTS ESTIMATED COST
$1,100,000Windmill Harbour intersection
improvements
• Mast-arm pole replacement
• Pathway / curb ramp
adjustments
• Landscaping
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
PROJECT C
Project E
PROJECT D
Project D
PROJECT E
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
64
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 73 of 93
| PROJECT F ELEMENT COMPONENTS ESTIMATED COST
$3,600,000Extend Chamberlin Drive to
Spanish Wells Road
• Additional pavement
• Curb & gutter & drainage
• Pavement markings
• Landscaping
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
PROJECT C
Project E
PROJECT D
Project D
PROJECT E
PROJECT F
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
65
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 74 of 93
| PROJECT G ELEMENT COMPONENTS ESTIMATED COST
$2,500,000Develop Gullah Geechee
Heritage Park
• Pathways/ boardwalks
• Permeable parking area
• Shelter
• Site Lighting
• Landscaping
• Environmental graphics /
signage elements
• Utility work
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
Project G
PROJECT C
Project E
PROJECT D
Project D
PROJECT E
PROJECT F
PROJECT G
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
66
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 75 of 93
| PROJECT H ELEMENT COMPONENTS ESTIMATED COST
$4,700,000Old Wild Horse Road improvements • Curb & gutter & drainage
• Asphalt pathways
• Pavement markings
• Landscaping
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
Project G
PROJECT C
Project E
PROJECT D
Project D
PROJECT E
Project H
PROJECT F
PROJECT G
PROJECT H
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
67
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 76 of 93
| PROJECT I
ELEMENT COMPONENTS ESTIMATED COST
$16,600,000Corridor-wide pathway, landscape,
wayfinding, and placemaking
• Asphalt pathways
• Boardwalk structures
• Pavement markings
• Pathway signage
• Landscaping
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
Project G
PROJECT C
Project I
Project E
PROJECT D
Project D
PROJECT E
Project H
PROJECT F
PROJECT G
PROJECT H
PROJECT I
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
68
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 77 of 93
| PROJECT J ELEMENT COMPONENTS ESTIMATED COST
$8,100,000Jenkins Island Access Road,
Parking, Cemetery Park
• Additional pavement
• Curb & gutter & drainage
• Pavement markings
• Landscaping
• Park improvements
• Utility work
• Traffic control
• Parking lots
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
Project G
PROJECT C
Project I
Project E
PROJECT D
Project D
PROJECT E
Project H
PROJECT F
Project J
PROJECT G
PROJECT H
PROJECT I
PROJECT J
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
69
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 78 of 93
| PROJECT K ELEMENT COMPONENTS ESTIMATED COST
$20,200,000Additional Eastbound Travel Lane
(Bridge to Squire Pope Road)
• Additional pavement
• Curb & gutter & drainage
• Pavement markings
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
Project G
PROJECT C
Project K
Project I
Project E
PROJECT D
Project D
PROJECT E
Project H
PROJECT F
Project J
PROJECT G
PROJECT H
PROJECT I
PROJECT J
PROJECT K
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
70
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 79 of 93
| PROJECT L ELEMENT COMPONENTS ESTIMATED COST
$13,600,000Additional Westbound Travel Lane
(Squire Pope Road to Bridge)
• Additional pavement
• Curb & gutter & drainage
• Pavement markings
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
Project G
PROJECT C
Project K
Project I
Project E
PROJECT D
Project D
PROJECT E
Project H
PROJECT F
Project J
PROJECT G
Project L
PROJECT H
PROJECT I
PROJECT J
PROJECT K
PROJECT L
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
71
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 80 of 93
| FULL PROJECT BUILD OUT
ESTIMATED COST
$125,800,000
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
Project B
Project F
Project G
PROJECT C
Project K
Project I
Project E
PROJECT D
Project D
PROJECT E
Project H
PROJECT F
Project J
PROJECT G
Project L
PROJECT H
PROJECT I
PROJECT J
PROJECT K
PROJECT L
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbour
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
72
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 81 of 93
| PROJECT FUNDING PATHS
Safe Streets and Roads for All (SS4A)
• Town applied for SS4A Grant for $23M in
May 2026
BUILD Grants (Formerly RAISE)
INFRA Program
PROTECT Program
Transportation Alternatives Set-Aside (TASA)
Bridge Investment Program
Carbon Reduction Program
Federal Transit Administration (FTA) Programs
Reconnecting Communities Grant
Congressional Direct Spending (Senate)
Congressional Community Project Funding (House)
FEDERAL
Tax Increment Financing (TIF) District
County Transportation Sales Tax
Town Sales Tax (SB 866)
Town General Obligation Bonds
Impact Fee Revenue
Town Funding
SCDOT
• Transit Alternatives Program (TAP)
• SCDOT Guideshare Program
• SCDOT Bicycle & Pedestrian
Program
• SCDOT Highway Safety
Improvement Program
State Direct Appropriation
State Infrastructure Bank
SC Department of Public Safety
Highway Safety Grants
Lowcountry Area Transportation
Study
LOCALSTATE
73
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 82 of 93
| PROCEDURAL STEPS FOR NEPA ASSIGNMENT
Coordination meeting with Federal Highway Administration (FHWA)
Provide public notice of intent to pursue NEPA Assignment
Prepare a draft application and publish for public comment
Prepare a draft memorandum of understanding and publish for
public comment
Execute the Memorandum of Understanding (MOU) to assume
federal responsibilities
1
2
3
4
5
All projects funded with direct or indirect federal funds will require the
project to follow the National Environmental Policy Act (NEPA) process
74
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 83 of 93
| ESTIMATED PROJECT TIMELINE
Project Development Phase
Feasibility Study / Master Planning
Engineering, Permitting & Project Readiness Construction & Implementation
Variable Timeframe 2-3 years depending on project specifics and funding 1.5-3 years per project
Final Engineering / Permits in Hand
Master Plan Adoption
Ribbon Cutting
Preliminary Engineering
• Establishes the need of the project
• Establishes potential project impacts
• Establishes potential level of
environmental review
• Identifies potential funding
strategies
• Determines which NEPA document will be
required – decided by major permitting agency
-Categorical Exclusion (CATEX)
-Environmental Assessment
-Environmental Impact Statement
• Develops design plans for implementation
• Achieves project approval
• Achieves project insertion into Statewide
Transportation Improvement Plan (STIP)
• Defines and aligns how the project will
be funded
• Delivery of project
• Project completion
is subject to funding
availability and
regulatory approvals.
75
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 84 of 93
| ADDITIONAL REQUESTS FOR SCDOT AND BEAUFORT COUNTY
SCDOT / Beaufort County examine continuous flow traffic in Windmill Harbour
area allowing for elimination of existing traffic signal by routing Crosstree Dr & C
Heinrichs Cir traffic under bridges.
SCDOT examine re-striping the westbound Cross Island Parkway into two lanes
and corresponding adjustments to William Hilton Parkway, reducing the number
of merge lanes.
Request SCDOT examine the use of pavement markings (i.e., chevrons) and other
signage to improve vehicular movement and safety.
76
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 85 of 93
| ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS
Gum Tree Road
• Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse)
• Signal timing
• Operational enhancements
• New pathway with lighting from Northpoint to Bus Drive
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
• School zone
77
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 86 of 93
| ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS
Gum Tree Road
• Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse)
• Signal timing
• Operational enhancements
• New pathway with lighting from Northpoint to Bus Drive
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
• School zone
Squire Pope Road
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
78
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 87 of 93
| ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS
Gum Tree Road
• Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse)
• Signal timing
• Operational enhancements
• New pathway with lighting from Northpoint to Bus Drive
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
• School zone
Squire Pope Road
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
Main Street
• Pedestrian safety improvements
• New sidewalks
• New walkway lighting
• Operational enhancements at key intersections (e.g. Wilborn Road and Whooping
Crane Way)
79
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 88 of 93
| ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS
Gum Tree Road
• Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse)
• Signal timing
• Operational enhancements
• New pathway with lighting from Northpoint to Bus Drive
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
• School zone
Squire Pope Road
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
Main Street
• Pedestrian safety improvements
• New sidewalks
• New walkway lighting
• Operational enhancements at key intersections (e.g. Wilborn Road and Whooping
Crane Way)
Wilborn Road
• Intersection improvements (WHP , Bus Drive, Main Street)
• Signal timing
• Pedestrian safety improvements
• Operational enhancements in conjunction with Main Street improvements
80
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 89 of 93
| ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS
Gum Tree Road
• Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse)
• Signal timing
• Operational enhancements
• New pathway with lighting from Northpoint to Bus Drive
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
• School zone
Squire Pope Road
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
Main Street
• Pedestrian safety improvements
• New sidewalks
• New walkway lighting
• Operational enhancements at key intersections (e.g. Wilborn Road and Whooping
Crane Way)
Wilborn Road
• Intersection improvements (WHP , Bus Drive, Main Street)
• Signal timing
• Pedestrian safety improvements
• Operational enhancements in conjunction with Main Street improvements
Palmetto Bay Road and Arrow Road / Point Comfort Road
• Signal timing
• Operational enhancements
• Pedestrian safety improvements
81
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 90 of 93
| ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS
Gum Tree Road
• Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse)
• Signal timing
• Operational enhancements
• New pathway with lighting from Northpoint to Bus Drive
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
• School zone
Squire Pope Road
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
Main Street
• Pedestrian safety improvements
• New sidewalks
• New walkway lighting
• Operational enhancements at key intersections (e.g. Wilborn Road and Whooping
Crane Way)
Wilborn Road
• Intersection improvements (WHP , Bus Drive, Main Street)
• Signal timing
• Pedestrian safety improvements
• Operational enhancements in conjunction with Main Street improvements
Palmetto Bay Road and Arrow Road / Point Comfort Road
• Signal timing
• Operational enhancements
• Pedestrian safety improvements
Sea Pines Circle Short-Term and Long-Term Improvements
• Operational enhancements (i.e., metered entries from approaches)
• Partnership with SCDOT on project development process
82
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 91 of 93
| ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS
Gum Tree Road
• Intersection Improvements (WHP , Marshpoint, Bus Drive, Wild Horse)
• Signal timing
• Operational enhancements
• New pathway with lighting from Northpoint to Bus Drive
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
• School zone
Squire Pope Road
• Pedestrian safety improvements
• New pathway lighting
• Mailbox location improvements
• Speed reduction
Main Street
• Pedestrian safety improvements
• New sidewalks
• New walkway lighting
• Operational enhancements at key intersections (e.g. Wilborn Road and Whooping
Crane Way)
Wilborn Road
• Intersection improvements (WHP , Bus Drive, Main Street)
• Signal timing
• Pedestrian safety improvements
• Operational enhancements in conjunction with Main Street improvements
Palmetto Bay Road and Arrow Road / Point Comfort Road
• Signal timing
• Operational enhancements
• Pedestrian safety improvements
Sea Pines Circle Short-Term and Long-Term Improvements
• Operational enhancements (i.e., metered entries from approaches)
• Partnership with SCDOT on project development process
William Hilton Parkway Adaptive Signal Timing and Operations
Assessment
• Improve signal timing
• Assess signal operations and improve adaptive system
• Coordination with SCDOT , Lowcountry Area Transportation Study, and
Beaufort County
83
TOWN OF HILTON HEAD ISLAND, SC | 07-28-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 92 of 93
THANK YOU!
Page 93 of 93