Planning Commission Meeting — Agenda Packet
Town of Hilton Head Island · Beaufort County · Planning Commission · meeting of Jul 15, 2026 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
Planning Commission Meeting
Wednesday, July 15, 2026, 2:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Pledge to the Flag
3. Adoption of the Agenda
4. Approval of the Minutes
a. Regular Meeting Minutes of June 17, 2026.
5. Unfinished Business
6. New Business
a. STDV-000427-2026: Public Hearing request from Tashika Simmons, owner
of 78 Oakview Road, for a Street Name Application to name an existing
access easement off Spanish Wells Road. The affected parcels are identified
on Beaufort County Tax Maps as R510 010 000 004C 0000, R510 010 000
004B 0000, R510 010 000 0352 0000, R510 010 000 0004 0000, R510 010
000 004G 0000, R510 010 000 004F 0000 and R510 010 000 0404 0000.
b. STDV-000576-2026: Public Hearing Request from Kenneth Simmons, owner
of 686 Spanish Wells Road, for a Street Name Application to name an existing
access easement off Spanish Wells Road. The affected parcel is identified on
Beaufort County Tax Maps as R510 010 000 0016 0000.
c. PPR-000590-2026: Public Hearing request from Neal Eike, with the Town of
Hilton Head Island, for an Application for Public Project Review for the property
identified on Beaufort County Tax Maps as Parcels R550-014-000-0954-0000
& R550 010 000 0454 0000, also identified as 4 Helmsway Way for the
renovation of the current skate park and the development of a new pump track
on a Town owned parcel.
d. Annual Traffic Monitoring and Evaluation Report — Section 16-2-103.J.10 of
Page 1 of 138
the LMO provides that this report will be prepared and submitted to the
Planning Commission annually by the Town Engineer
7. Public Comment - Non Agenda Items
8. Commission Business
a. Nomination and Election of Officers for July 1, 2026 - June 30, 2027 Term.
b. Appointment of Board Secretary for July 1, 2026 - June 30, 2027 Term.
9. Chairman's Report
10. Staff Reports
11. Adjournment
FOIA Compliance: Public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 2 of 138
Town of Hilton Head Island Planning Commission
Meeting Minutes
6/17/2026 Page | 1
Town of Hilton Head Island
PLANNING COMMISSION MEETING
Wednesday, June 17, 2026, 2:00 PM
Minutes
1. Call to Order
Vice-Chair Whaley called the meeting to order at 2:00 p.m. In attendance were: Vice-Chair
Whaley, Joseph DuBois, Bill Redman, Bruce Siebold and Chuck Lobaugh. Excused were
Chair Tom Henz, Ed Cordes, Jeff Turnbull and Margaret Hewitt.
2. Pledge to the Flag
3. Adoption of the Agenda
Commissioner Lobaugh moved to approve the meeting agenda as presented. Commissioner
DuBois seconded. The motion passed unanimously.
4. Approval of the Minutes
a. Regular Meeting Minutes of April 15, 2026.
Commissioner Redman moved to approve the meeting minutes of April 15, 2026.
Commissioner Siebold seconded. The meeting minutes of April 15, 2026 were
unanimously approved.
5. Unfinished Business
There was no Unfinished Business.
6. New Business
a. STDV-000321-2026- Public hearing request from Valeria Plasse, owner of 201 Wild
Horse Rd., for a Street Name Application to name an existing access easement off
Wild Horse Rd. The affected parcel is identified on Beaufort County Tax Maps as
R510 007 000 016A 0000.
Acting Chair Whaley introduced the item and declared the Public Hearing open. Kathleen
Litchfield, 911 Communications Manager, presented a proposed access easement
located off Wild Horse Road to be named Cimarron Manor. Staff recommends the
Planning Commission approve the Cimarron Manor street name application based on the
criteria outlined in the Land Management Ordinance Section 16-2-103.O.4. Following the
opportunity for public comment and Commission discussion, the Public Hearing was
closed.
A motion was made by Commissioner Lobaugh moved to approve the naming of the
street as presented. Comissioner DuBois seconded. The motion was passed
unanimously.
Page 3 of 138
Town of Hilton Head Island Planning Commission
Meeting Minutes
6/17/2026 Page | 2
b. STDV-000376-2026 - Public hearing request from Chauncey Napoleon Barnwell,
owner of Beaufort County Tax Map Parcel R510 007 00D 0007 0000, for a Street
Name Application to name the existing access easement serving the property. The
affected parcels are identified on Beaufort County Tax Maps as R510 007 00D 0007
0000, R510 007 00D 0003 0000, R510 007 00D 0004 0000, R510 007 00D 0002
0000, R510 007 00D 0002 0000, R510 007 00D 0001 0000, R510 007 000 026B
0000.
Acting Chair Whaley introduced the item and declared the Public Hearing open. Kathleen
Litchfield, 911 Communications Manager, presented a proposed access easement off
Gum Tree Road to be named Nellie Drive. Staff recommends the Planning Commission
approve the Nellie Drive street name application based on the criteria outlined in Land
Management Ordinance Section 16-2-103.O.4. Following the opportunity for public
comment and Commission discussion, the Public Hearing was closed.
A motion was made by Commissioner DuBois to approve the naming of the street as
presented. Comissioner Siebold seconded. The motion was passed unanimously.
7. Public Comment - Non Agenda Items
There was no public comment on non-agenda items.
8. Commission Business
There was no Commission business.
9. Chairman's Report
Chair
10. Staff Reports
Shea Farrar introduced two new staff members to the Commission. The Commission
welcomed Kyle Brotherton, Principal Planner and Kendal Wagner, Summer Intern.
11. Adjournment
The meeting was adjourned at 2:25 pm.
The full recording and a transcript of this meeting can be found on the Town’s website
at www.hiltonheadislandsc.gov
Page 4 of 138
Page 1 of 7
TOWN OF HILTON HEAD ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
One Town Center Court Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908
STAFF REPORT
NEW STREET NAME
Case # New Street Name Public Hearing Date
STDV-000427-2026 Delphine Rufus Court July 15, 2026
Parcel Data or Location: Applicant/Agent
R510 010 000 004C 0000
APPLICANT – Tashika
Simmons
78 Oakview Road
Hilton Head Island, SC 29928
Application Summary
STDV-000427-2026 – Public Hearing request from Tashika Simmons, owner of 78
Oakview Rd., for a Street Name Application to name an existing access easement off
Spanish Wells Rd. The affected parcels are identified on Beaufort County Tax Maps
as R510 010 000 004C 0000, R510 010 000 004B 0000, R510 010 000 0352 0000,
R510 010 000 0004 0000, R510 010 000 004G 0000, R510 010 000 004F 0000, and
R510 010 000 0404 0000.
Staff Recommendation
Staff recommends the Planning Commission approve the Delphine Rufus Court
street name application based on the criteria outlined in Land Management Ordinance
Section 16-2-103.O.4 and enclosed herein.
Background
Tashika Simmons, applicant, proposes to name an access easement located off Spanish
Wells Road. Delphine Rufus Court will provide direct access to 2 homes on the parcel.
Due to the zoning in this area (RM-4 – Low to Moderate Density), the 2 dwelling units are
the maximum allowed on the parcel. This access easement could potentially serve as
access for the surrounding parcels if they are redeveloped in the future.
See Attachment A, Site Plan
Page 5 of 138
Page 2 of 7
As set forth in LMO Section 16-2-103.O.3.d, Decision-Making Body Review and
Decision, the Commission shall hold a public hearing and make a final decision on the
application based on the standards in LMO Section 16-2-103.O.4, Street/Vehicular
Access Easement Review Standards.
Summary of Facts and Conclusion of Law
Criterion A: No new street or vehicular access easement, or proposed modification of the
name of an existing street or vehicular access easement, shall duplicate, be phonetically
similar to, or in any way be likely to be confused with an existing street or vehicular
access easement, despite of the use of prefixes or suffixes. (LMO Section 16-2-103.O.4.a).
Findings of Fact:
1. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch
have determined Delphine Rufus Court is not duplicated within the Town or
Beaufort County.
2. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have
determined Delphine Rufus Court is not phonetically similar to an existing
street or vehicular access easement.
3. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have
determined Delphine Rufus Court will not likely be confused with an existing
street or vehicular access easement.
Conclusion of Law:
1. The proposed street name Delphine Rufus Court mmeets the requirements of this
criterion.
Summary of Facts and Conclusion of Law
Criterion B: Name(s) shall be simple, logical, easy to read and pronounce, and are clear
and brief. Use of frivolous or complicated words or unconventional spellings in names
shall not be approved. (LMO Section 16-2-103.O.4.b).
Findings of Fact:
1. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch
determined Delphine Rufus Court is simple, logical, easy to read and
pronounce.
2. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch
determined Delphine Rufus Court is clear and brief.
3. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch
determined Delphine Rufus Court does not include frivolous or complicated
words or unconventional spelling.
Conclusion of Law:
1. The proposed street name Delphine Rufus Court mmeets the requirements of
this criterion.
Page 6 of 138
Page 3 of 7
Summary of Facts and Conclusions of Law
Criterion C: It is desirable to use names that have some association with Hilton Head
Island and specifically with the immediate location of the street or place, such as
reference to local history or physiographic features. (LMO Section 16-2-103.O.4.c).
Finding of Fact:
1. The proposed street name Delphine Rufus Court was chosen because the
applicant, along with her neighboring parcel owner, Mr. Kenneth Simmons,
agreed upon a name that would honor both their ancestors, Delphine and Rufus,
whose lives reflect the strength and contributions of the Gullah families that
shaped Hilton Head Island.
Conclusion of Law:
1. The proposed street name Delphine Rufus Court mmeets the requirements of this
criterion.
Summary of Facts and Conclusion of Law
Criterion D: Use of a common theme is recommended for names of streets that are
associated with one another, such as those within a residential development. (LMO
Section 16-2-103.O.4.d).
Findings of Fact:
1. The proposed Delphine Rufus Court is not associated with other streets within
a residential development.
Conclusion of Law:
1. This criterion does not apply to this application.
Summary of Facts and Conclusion of Law
Criterion E: Streets or vehicular access easements that continue through an intersection
should generally bear the same name, except where the street crosses a major arterial or
where existing address points on a street require that the street given a different name.
(LMO Section 16-2-103.O.4.e).
Finding of Fact:
1. The proposed Delphine Rufus Court does not continue through an intersection.
Conclusion of Law:
1. T his criterion does not apply to this application.
Summary of Facts and Conclusion of Law
Criterion F: A street or vehicular access easement making an approximate right-angle
turn where there is no possibility of extending the street or vehicular access easement in
either direction shall be considered to be continuous and continue the same name. Where
there is a choice of direction or a possibility of extending either section in the future, such
Page 7 of 138
Page 4 of 7
configuration shall be considered to be an intersection and the street/easement segments
extending from the intersection shall bear different names. (LMO Section 16-2-103.O.4.f).
Findings of Fact:
1. The proposed Delphine Rufus Court would not make a right-angle turn.
Conclusion of Law:
1. This criterion ddoes not apply to this application.
Summary of Facts and Conclusion of Law
Criterion G. New or modified street names should generally use Drive, Lane, Place,
Road, Street, or Way as suffixes. The following street designations should only be used if
the street design meets one of the following descriptions. This list is not intended to limit
the use of other appropriate suffixes.
1. Alley – A street providing vehicular access to the rear of lots or buildings, usually
as a secondary means of access to a property.
2. Avenue – A street that is continuous.
3. Boulevard – A street with a landscaped median dividing the roadway.
4. Circle – A street with a complete loop on the end or a side street that intersects
another street at two adjacent intersections.
5. Court – A street terminating in a cul-de-sac, not longer than 1,000 feet in length.
6. Extension – A section of street forming an additional length.
7. Parkway – A street designated as a collector or arterial road, with a landscaped
median reflecting the parkway character implied in the name.
(LMO Section 16-2-103.O.4.g).
Finding of Fact:
The proposed roadway is an access easement.
Conclusion of Law:
1. T his criterion does not apply to this application.
Summary of Facts and Conclusion of Law
Criterion H. The suffixes Manor, Trace, and Common shall typically be used to name
vehicular access easements. (LMO Section 16-2-103.O.4.h).
Finding of Fact:
1. The proposed name is Delphine Rufus Court. While not typically used for
easements, the LMO does not prohibit using the suffix “Court.”
Conclusion of Law:
1. The proposed street name Delphine Rufus Court m eets the requirements of this
criterion.
Page 8 of 138
Page 5 of 7
Summary of Facts and Conclusions of Law
Criterion I. Where natural barriers, intervening land uses, or developments that break an
existing street into two separate streets that are not likely to be reconnected in the future,
the streets shall be named in a manner that considers the potential economic impact of the
number of address points and type of addresses impacted. (LMO Section 16-2-103.O.4.i).
Finding of Fact:
1. The subject street is not broken into two separate streets.
Conclusion of Law:
1. This criterion does not apply to this application.
PREPARED BY:
KML
June 29, 2026
Kathleen Litchfield DATE
911 Communications Manager
REVIEWED BY:
TL
June 30, 2026
Trey Lowe
Interim Planning Director
DATE
ATTACHMENTS:
A) Site Plan
B) Applicant’s Narrative
Page 9 of 138
Page 6 of 7
A) Site Plan
Page 10 of 138
Page 7 of 7
B) Applicant’s Narrative
Page 11 of 138
Page 1 of 6
TOWN OF HILTON HEAD ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
One Town Center Court Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908
STAFF REPORT
NEW STREET NAME
Case # New Street Name Public Hearing Date
STDV-000576-2026 Kenneth Lane July 15, 2026
Parcel Data or Location: Applicant/Agent
R510 010 000 0016 0000
APPLICANT – Kenneth
Simmons
1711 Mallard Court
Upper Marlboro, MD 20774
Application Summary
STDV-000427-2026 – Public Hearing Request from Kenneth Simmons, owner of 686
Spanish Wells Rd., for a Street Name Application to name an existing access easement
off Spanish Wells Rd. The affected parcel is identified on Beaufort County Tax Maps
as R510 010 000 0016 0000.
Staff Recommendation
Staff recommends the Planning Commission approve the Kenneth Lane street name
application based on the criteria outlined in Land Management Ordinance Section 16-
2-103.O.4 and enclosed herein.
Background
Kenneth Simmons, applicant, proposes to name an access easement located off Spanish
Wells Road. Kenneth Lane will provide direct access to 4 homes on the parcel. Due to the
zoning in this area (RM-4 – Low to Moderate Density), the 4 dwelling units are the
maximum allowed on the parcel.
See Attachment A, Site Plan
Page 12 of 138
Page 2 of 6
As set forth in LMO Section 16-2-103.O.3.d, Decision-Making Body Review and
Decision, the Commission shall hold a public hearing and make a final decision on the
application based on the standards in LMO Section 16-2-103.O.4, Street/Vehicular
Access Easement Review Standards.
Summary of Facts and Conclusion of Law
Criterion A: No new street or vehicular access easement, or proposed modification of the
name of an existing street or vehicular access easement, shall duplicate, be phonetically
similar to, or in any way be likely to be confused with an existing street or vehicular
access easement, despite of the use of prefixes or suffixes. (LMO Section 16-2-103.O.4.a).
Findings of Fact:
1. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch
have determined Kenneth Lane is not duplicated within the Town or Beaufort
County.
2. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have
determined Kenneth Lane is not phonetically similar to an existing street or
vehicular access easement.
3. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have
determined Kenneth Lane will not likely be confused with an existing street or
vehicular access easement.
Conclusion of Law:
1. The proposed street name Kenneth Lane mmeets the requirements of this
criterion.
Summary of Facts and Conclusion of Law
Criterion B: Name(s) shall be simple, logical, easy to read and pronounce, and are clear
and brief. Use of frivolous or complicated words or unconventional spellings in names
shall not be approved. (LMO Section 16-2-103.O.4.b).
Findings of Fact:
1. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch
determined Kenneth Lane is simple, logical, easy to read and pronounce.
2. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch
determined Kenneth Lane is clear and brief.
3. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch
determined Kenneth Lane does not include frivolous or complicated words
or unconventional spelling.
Conclusion of Law:
1. The proposed street name Kenneth Lane mmeets the requirements of this
criterion.
Page 13 of 138
Page 3 of 6
Summary of Facts and Conclusions of Law
Criterion C: It is desirable to use names that have some association with Hilton Head
Island and specifically with the immediate location of the street or place, such as
reference to local history or physiographic features. (LMO Section 16-2-103.O.4.c).
Finding of Fact:
1. The proposed street name, Kenneth Lane, was chosen in honor of the property
owner, Mr. Kenneth Simmons. Naming the street after Mr. Simmons preserves
the family's connection to the property and recognizes its longstanding lineage.
Conclusion of Law:
1. The proposed street name Kenneth Lane mmeets the requirements of this
criterion.
Summary of Facts and Conclusion of Law
Criterion D: Use of a common theme is recommended for names of streets that are
associated with one another, such as those within a residential development. (LMO
Section 16-2-103.O.4.d).
Findings of Fact:
1. The proposed Kenneth Lane is not associated with other streets within a
residential development.
Conclusion of Law:
1. This criterion does not apply to this application.
Summary of Facts and Conclusion of Law
Criterion E: Streets or vehicular access easements that continue through an intersection
should generally bear the same name, except where the street crosses a major arterial or
where existing address points on a street require that the street given a different name.
(LMO Section 16-2-103.O.4.e).
Finding of Fact:
1. The proposed Kenneth Lane does not continue through an intersection.
Conclusion of Law:
1. T his criterion does not apply to this application.
Summary of Facts and Conclusion of Law
Criterion F: A street or vehicular access easement making an approximate right-angle
turn where there is no possibility of extending the street or vehicular access easement in
either direction shall be considered to be continuous and continue the same name. Where
there is a choice of direction or a possibility of extending either section in the future, such
configuration shall be considered to be an intersection and the street/easement segments
extending from the intersection shall bear different names. (LMO Section 16-2-103.O.4.f).
Page 14 of 138
Page 4 of 6
Findings of Fact:
1. The proposed Kenneth Lane would not make a right-angle turn.
Conclusion of Law:
1. This criterion ddoes not apply to this application.
Summary of Facts and Conclusion of Law
Criterion G. New or modified street names should generally use Drive, Lane, Place,
Road, Street, or Way as suffixes. The following street designations should only be used if
the street design meets one of the following descriptions. This list is not intended to limit
the use of other appropriate suffixes.
1. Alley – A street providing vehicular access to the rear of lots or buildings, usually
as a secondary means of access to a property.
2. Avenue – A street that is continuous.
3. Boulevard – A street with a landscaped median dividing the roadway.
4. Circle – A street with a complete loop on the end or a side street that intersects
another street at two adjacent intersections.
5. Court – A street terminating in a cul-de-sac, not longer than 1,000 feet in length.
6. Extension – A section of street forming an additional length.
7. Parkway – A street designated as a collector or arterial road, with a landscaped
median reflecting the parkway character implied in the name.
(LMO Section 16-2-103.O.4.g).
Finding of Fact:
The proposed roadway is an access easement.
Conclusion of Law:
1. T his criterion does not apply to this application.
Summary of Facts and Conclusion of Law
Criterion H. The suffixes Manor, Trace, and Common shall typically be used to name
vehicular access easements. (LMO Section 16-2-103.O.4.h).
Finding of Fact:
1. The proposed name is Kenneth Lane. While not typically used for easements, the
LMO does not prohibit using the suffix “Lane.”
Conclusion of Law:
1. The proposed street name Kenneth Lane m eets the requirements of this
criterion.
Summary of Facts and Conclusions of Law
Criterion I. Where natural barriers, intervening land uses, or developments that break an
existing street into two separate streets that are not likely to be reconnected in the future,
the streets shall be named in a manner that considers the potential economic impact of the
number of address points and type of addresses impacted. (LMO Section 16-2-103.O.4.i).
Page 15 of 138
Page 5 of 6
Finding of Fact:
1. The subject street is not broken into two separate streets.
Conclusion of Law:
1. This criterion does not apply to this application.
PREPARED BY:
KML
June 29, 2026
Kathleen Litchfield DATE
911 Communications Manager
REVIEWED BY:
TL
June 30, 2026
Trey Lowe
Interim Planning Director
DATE
ATTACHMENTS:
A) Site Plan
B) Applicant’s Narrative
Page 16 of 138
Page 6 of 6
A) Site Plan
B) Applicant’s Narrative
Page 17 of 138
1
TOWN OF HILTON HEAD ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
One Town Center Court, Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908
STAFF REPORT
PUBLIC PROJECT REVIEW
Case # Project Name Public Hearing Date
PPR-000590-2025 Crossings Park 1 July 15, 2026
Project Location Applicant
4 Helmsman Way
Hilton Head Island, SC 29928
Parcel R550-014-000-0954-0000
& R550-014-000-0454-0000
Neal Eike
Town of Hilton Head Island
1 Town Center Court
Hilton Head Island, SC 29928
Application Summary
PPR-000590-2026: Public Hearing request from Neal Eike, with the Town of Hilton Head Island, for
an Application for Public Project Review for the property identified on Beaufort County Tax Maps as
Parcels R550-014-000-0954-0000 & R550 010 000 0454 0000, also identified as 4 Helmsway Way for
the renovation of the current skate park and the development of a new pump track on a Town owned
parcel.
Staff Recommendation
Staff recommends the Planning Commission find this application to be consistent with the Town’s
Comprehensive Plan (Our Plan) for location, character, and extent based on those Findings of Fact
and Conclusions of Law as determined by the LMO Official and enclosed herein.
Background
Crossings Park has evolved over time into one of the Town's primary community athletic and
recreational destinations. Recognizing the need to modernize aging facilities, expand recreational
opportunities, and accommodate growing community demand, the Town initiated preparation of a
comprehensive master plan for the park. The proposed project consists of the renovation of the
existing skate park and construction of a new bicycle pump track within the existing Crossings Park as
proposed in the adopted master plan. Throughout 2023 and early 2024, Town Council conducted a
series of public workshops to evaluate future improvements to Crossings Park on February 14, 2023,
June 14, 2023, and January 23, 2024. The Parks and Recreation Commission reviewed and
recommended the master plan on March 14, 2024, and Town Council adopted the Crossings Park
Master Plan on May 21, 2024.
The proposed improvements do not establish a new public recreational use but rather renovate and
Page 18 of 138
2
expand an existing Town-owned park in accordance with the adopted Crossings Park Master Plan.
This phase implements long-range recommendations contained in the Town's Our Plan 2020–2040
Comprehensive Plan and Parks and Recreation Master Plan, advancing the Town's goal of providing
best-in-class parks and recreation facilities while promoting healthy lifestyles, accessibility, and year-
round recreational opportunities for residents and visitors.
Description of Project
The Town of Hilton Head Island proposes to move forward with the portion of the Crossing Park
Master Plan that includes the renovation of the existing skate park and the construction of a new
pump track within Crossings Park.
The skate park will be improved with updated riding surfaces, modern skate features, improved
accessibility, enhanced safety, landscaping, seating, lighting, drainage improvements, and supporting
infrastructure. The project also includes construction of a new asphalt pump track immediately north
of the skate park, providing a facility suitable for bicycles, scooters, skateboards, balance bikes, and
adaptive wheeled equipment.
The pump track has been designed to work with the site's existing topography while incorporating
landscaped swales, native plantings, retaining walls, and integrated stormwater management features.
One retaining wall will function as spectator seating and viewing space.
Additional improvements include new pedestrian connections throughout the project area, conversion
of the existing Bristol Sports Arena vehicular entrance from Arrow Road to pedestrian-only access.
Location, Character, and Extent
Per Land Management Ordinance Section 16-2-103.Q.4, Public Project Review Standards, in
determining whether or not a proposed public project is compatible with the Comprehensive Plan,
the Planning Commission shall consider whether the location, character, and extent of the proposed
development is consistent with, or conflicts with, the plan’s goals and implementation strategies.
Summary of Facts and Conclusions of Law
Findings of Fact:
1. LMO Appendix D-24, Application Deadlines, requires applications before the Planning
Commission to be submitted to the LMO Official 30 calendar days prior to the meeting. The
applicant submitted the application for this project on June 16, 2026.
2. LMO Section 16-2-102.E.1, Hearing Scheduling, states that when an application is subject to a
hearing, the LMO Official shall ensure that the hearing on the application is scheduled for a
regularly scheduled meeting of the body conducting the hearing or a meeting specialty called
for that purpose by such body. The LMO Official scheduled the public hearing on the
application for the July 15, 2026, Planning Commission meeting, which is a regularly
scheduled meeting of the Commission.
3. LMO Section 16-2-102.E.2, Hearing Notice, requires the LMO Official to publish a notice of
the public hearing in a newspaper of general circulation in the Town no less than 15 calendar
days before the hearing date. Notice of the July 15, 2026, public hearing was published in the
Island Packet on June 28, 2026.
4. LMO Section 16-2-102.E.2, Hearing Notice, requires the applicant to mail a notice of the
Page 19 of 138
3
public hearing by first-class mail to the owner(s) of the land directly contiguous to the
proposed project no less than 15 calendar days before the hearing date. The Town owns all
adjacent properties.
Conclusions of Law:
1. The application was submitted 30 calendar days prior to the meeting date, in compliance with
LMO Appendix D-24.
2. The LMO Official scheduled the public hearing on the application for the July 15, 2026,
Planning Commission meeting, in compliance with LMO Section 16-2-102.E.1.
3. Notice of the public hearing was published over 15 calendar days before the meeting date, in
compliance with LMO Section 16-2-102.E.2.
Summary of Facts and Conclusions of Law
Findings of Fact:
The Comprehensive Plan speaks to the location, character and extent of the proposed project.
• The proposed project consists of the renovation of the existing skate park and construction of
a new bicycle pump track, together with associated pedestrian improvements, landscaping,
grading, drainage, retaining walls, lighting, utilities, accessibility improvements, and related
site infrastructure. The project also includes conversion of the existing vehicular entrance
serving the Bristol Sports Arena from Arrow Road to pedestrian-only access, improving
pedestrian connectivity within the park.
• The proposed project represents implementation of the Crossings Park Master Plan and is the
renovation and expansion of an existing public recreational facility rather than the
establishment of a new public use.
• The Town initiated planning for the redevelopment of Crossings Park through a series of
Town Council Workshops held on February 14, 2023, June 14, 2023, and January 23,
2024, to evaluate recreational needs, public input, and long-term improvements to the
park.
• The Parks and Recreation Commission reviewed the proposed Crossings Park Master Plan on
March 14, 2024, and recommended its adoption.
• Town Council approved the Crossings Park Master Plan on May 21, 2024, establishing a long-
term vision for redevelopment and expansion of Crossings Park through phased
implementation.
• The adopted Crossings Park Master Plan identifies renovation of the existing skate park and
construction of a new pump track as priority improvements intended to expand
recreational opportunities, improve accessibility, modernize aging facilities, and enhance
user safety.
• The proposed improvements utilize existing developed recreational areas within Crossings
Park and are designed to complement future phases of the adopted master plan while
minimizing impacts to surrounding natural resources.
Page 20 of 138
4
• The design incorporates modern recreational facilities together with landscaped planting areas,
native vegetation, stormwater management features, pedestrian connectivity, and site
improvements that are consistent with the design character established within the Town's
more recent public parks.
• The Comprehensive Plan (Our Plan) identifies Parks & Recreation as a Major Core Value,
emphasizing the provision of best-in-class recreation facilities, universal accessibility, and
multi-dimensional inclusion across the Town’s public park system. The Parks &
Recreation Master Plan Part 1 is an adopted appendix to the Comprehensive Plan and
provides detailed system-wide recommendations.
• Our Plan includes two goals that directly support upgraded and expanded public recreation
facilities:
Goal 2: Provide best-in-class recreation facilities and programs in the Island’s public parks.
2.1: Continue to provide high-quality park furnishings and amenities.
2.2: Continue to provide a variety of activities and amenities that meet the needs of the
community and contemporary trends.
Goal 5: Improve and enhance the Island’s multi-use trail system.
5.1: Identify areas for improved access to public pathways and expansions of the
system.
5.2: Enhance pathways to ensure cyclist and pedestrian safety.
• The Infrastructure Core Value of Our Plan further supports this project, including:
5.1.2: Evaluate existing Town facilities and identify opportunities for redevelopment or
new construction to provide best-in-class facilities.
5.2: Ensure the Town continues to provide services and facilities that meet or exceed
community expectations.
• The proposed project directly implements the adopted Comprehensive Plan, Parks and
Recreation Master Plan, and Crossings Park Master Plan by renovating an existing public
recreational facility and expanding recreational opportunities for residents and visitors.
• Staff finds the proposed location, character, and extent of the project to be consistent with the
goals, objectives, and implementation strategies of the Comprehensive Plan.
Conclusions of Law:
1. The Comprehensive Plan supports the location of the proposed project.
• The subject property consists of Town-owned parcels located at 4 Helmsman Way, identified
as Beaufort County Tax Map Numbers R550-014-000-0954-0000 and R550-010-000-
0454-0000, and is zoned Public Recreation (PR).
• The proposed project is located entirely within the existing Crossings Park recreational
complex, an established Town-owned public park serving residents and visitors.
• The project consists of the renovation of the existing skate park, construction of a new bicycle
Page 21 of 138
5
pump track, pedestrian improvements, landscaping, grading, drainage improvements,
retaining walls, lighting, utilities, and associated site improvements. The project also
converts the existing Bristol Sports Arena vehicular entrance from Arrow Road to
pedestrian-only access, improving internal park connectivity.
• The proposed improvements occur within previously developed recreational areas and do not
establish a new public use, but instead expand and improve an existing recreational facility.
• The Our Plan 2020–2040 Comprehensive Plan encourages continued investment in existing
public parks and recreation facilities, expansion of recreational opportunities, and
implementation of the Parks and Recreation Master Plan.
2. The Comprehensive Plan supports the character of the proposed project.
• Crossings Park has long served as one of the Town's principal community recreation
destinations, providing athletic and recreational facilities for residents and visitors.
• The proposed project represents Phase 1 implementation of the Crossings Park Master Plan,
which was developed through an extensive public planning process including Town
Council Workshops on February 14, 2023, June 14, 2023, and January 23, 2024; review by
the Parks and Recreation Commission on March 14, 2024; and adoption by Town Council
on May 21, 2024.
• The proposed improvements modernize an aging recreational facility while expanding
recreational opportunities through renovation of the existing skate park and construction
of a new pump track designed to accommodate users of varying ages and abilities.
• The project incorporates accessible pedestrian connections, landscaped planting areas, native
vegetation, stormwater management features, spectator viewing areas, lighting, and site
improvements intended to improve safety, accessibility, and the overall user experience.
• The design enhances the existing character of Crossings Park while reflecting the design
standards established in the Town's more recent parks, creating a facility that is consistent
with the Town's park system while maintaining a unique identity.
• The proposed improvements are consistent with the Parks and Recreation Master Plan
objective of reinvesting in existing recreational facilities and expanding opportunities for
active recreation.
3. The Comprehensive Plan supports the extent of the proposed project.
• The proposed improvements represent the first phase of implementation of the Town
Council-adopted Crossings Park Master Plan.
• The scope of work is limited to renovation and expansion of existing recreational facilities and
associated site improvements within the existing park boundaries.
Page 22 of 138
6
• The project includes improvements necessary to support long-term functionality, including
pedestrian circulation, grading, drainage, landscaping, lighting, utilities, accessibility
improvements, and stormwater management.
• The proposed extent of development is proportional to the size and function of Crossings
Park and is intended to complement future phases of park improvements identified in the
adopted master plan.
• The proposed project directly implements recommendations contained in the Our Plan 2020–
2040 Comprehensive Plan, the Parks and Recreation Master Plan, and the adopted
Crossings Park Master Plan by modernizing existing recreational facilities, improving
accessibility, expanding recreational opportunities, and reinvesting in existing public
infrastructure.
LMO Official Determination
The LMO Official determines this application is compatible with the Comprehensive Plan for the
location, character, and extent as based on the above Findings of Fact and Conclusions of Law.
Planning Commission Determination and Motion
Per LMO Section 16-2-103.Q.4, Public Project Review Standards, the Planning Commission’s role is to
determine whether the application is compatible or is not compatible with the Comprehensive Plan for
location, character, and extent.
PREPARED BY:
SF
July 1, 2026
Shea Farrar, Principal Planner and Board
Coordinator
DATE
REVIEWED BY:
TL
July 06, 2026
Trey Lowe, Development Services Program
Manager
DATE
ATTACHMENTS:
A) Location Map/Plans
B) Narrative
Page 23 of 138
CROSSINGS PARK
Town of Hilton Head Island, South Carolina
PARCEL MAP - SKATE PARK
Attachment A
Page 24 of 138
CROSSINGS PARK
Town of Hilton Head Island, South Carolina
PARCEL MAP - PUMP TRACK
Page 25 of 138
CROSSINGS PARK
Town of Hilton Head Island, South Carolina
VICINITY MAP
CROSSINGS PARK:
SKATE PARK & PUMP TRACK
Page 26 of 138
CROSSINGS PARK
Town of Hilton Head Island, South Carolina
1
2
3
LEGEND
SKATE PARK - REPLACEMENT
PUMP TRACK - NEW
FUTURE BALL FIELD
ARROW RD.
PALMETTO BAY ROAD RD.
LOW
LOW
LOW
LOW
LOW
LOWLOW
LOW
LOWLOWLOWLOWLOW
LOWLOWLOWLOWLOWLOWLOWLOW
LOWLOWLOWLOWLOWLOWLOWLOW
LOWLOWLOWLOWLOWLOW
LOWLOWLOWLOW
LOWLOWLOWLOWLOWLOW
LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW LOW LOW LOW
LOW LOW LOW LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LO
W
LOW
LOW
LOWLOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOWLOW
LOW
LOW
LOW
LOW
LOWLOWLOWLOW
1 2 3 4 5 6 7 8
19 20 21 22 23 2417 18
10 11 12 13 14 15 169
Scale: 1" = 50'-0" 0' 50'25' 100'
CROSSINGS PARK
1
32
Page 27 of 138
CROSSINGS PARK
Town of Hilton Head Island, South Carolina
SKATE PARK
9
11
9
10
10
10
9
9
9
9
9
911
Scale: 1" = 30'-0" 0' 30'15' 60'
CROSSINGS PARK
HELMSMAN WAY
ARROW ROAD
BRISTOL ARENA
EXISTING TREES
EXISTING TREES
EXISTING TREES
HALF PIPE
QUARTER PIPE
STAIRS WITH RAIL
FUN BOXES
KICKER GAPS
A-FRAME
VARIOUS BANKS
HIP BANK
PICNIC SHELTER
Page 28 of 138
CROSSINGS PARK
Town of Hilton Head Island, South Carolina
Scale: 1" = 20'-0" 0' 20'10' 40'
CROSSINGS PARK
HELMSMAN WAY
STARTING PLATFORM
STARTING PLATFORM
VIEWING PLAZA
WALL RIDE
FUTURE BASEBALL
PUMP TRACK
EXISTING TREES
EXISTING TREES
EXISTING TREES
Page 29 of 138
June 17, 2026
Crossings Park, Hilton Head Island, South Carolina
Parcel Number: R550-014-000-0954-0000 & R550 010 000 0454 0000
Public Project Review NarraƟve
The Town of Hilton Head Island is proposing the renovation of the current skate park and the development of a
new pump track on a Town-owned parcel located at 4 Helmsman Way. Development of these facilities will
contribute to the Town’s Comprehensive Plan goal of providing best-in-class parks and recreation, as well as
promoting inclusion, equity and access.
This proposed portion of the Crossings Park development will expand and enhance recreational offerings for the
community. The proposed renovation of the existing skate park and the addition of a new pump track aim to
revitalize this well-used recreational area by improving safety, accessibility, and rider flow while introducing
features suitable for a wider range of ages and abilities. The design integrates new planting areas throughout the
skate park and pump track to soften the edges, enhance biodiversity, and create a more welcoming landscape
setting. Together, these upgrades will create a more inclusive, engaging, and sustainable community facility
that supports active recreation year-round.
As part of these improvements, the existing vehicular entrance from Arrow Road to the Bristol Sports Arena
will be closed and converted to pedestrian-only access, providing a direct connection to the Phase 1
pedestrian pathway leading to the Pickleball complex.
The pump track is positioned north of the skate park, adjacent to the future baseball fields, and is carefully
shaped to work with the site’s natural undulating topography. The design incorporates planted swales and
vegetated areas that both soften the landscape and function as stormwater management features. Thoughtful
grading accommodates a series of retaining walls, one of which is designed to double as a spectator railing,
enhancing both usability and viewing opportunities.
The proposed improvements will build upon the site’s existing character, enhancing its aesthetic quality to align
with the design standards established in Hilton Head Island’s more recent parks. The result will be a park that is
clearly identifiable as a Town of Hilton Head Island Park, yet distinct in its own identity. The park will be maintained
as a welcoming and safe community amenity for both residents and visitors.
Attachment B
Page 30 of 138
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Planning Commission
TO: Planning Commission
FROM: Jeff Netzinger, Engineering Director / Town Engineer
VIA: Shawn Gillen, Assistant Town Manager
Theresa McVey, Traffic Operations Manager
CC: Trey Lowe, Interim Planning Director / LMO Official
Shawn Leininger, Deputy Town Manager
DATE: July 15, 2026
SUBJECT: Annual Traffic Monitoring and Evaluation Report
RECOMMENDATION:
The Planning Commission review and consider the 2025 Traffic Monitoring and Evaluation
Report, discuss its findings and recommendations, and elicit public comments at the meeting
in accordance with Section 16-2-103.J.10.c of the Land Management Ordinance (LMO). It is
further recommended that the Planning Commission provide its comments on the report as
well as any supplemental comments or recommendations to Town Council in accordance with
Section 16-2-103.J.10.c.ii of the LMO.
SUMMARY:
This report and recommendations provided herein are prepared and respectfully submitted to
the Planning Commission in accordance with the requirements outlined in Section 16-2-
103.J.10 of the Town’s LMO as Attachment 1. Accordingly, the report summarizes trends in
traffic demand within the Town, including July weekday traffic counts at intersections and on
major arterials. Also summarized in the report are the results of operational analyses for the
weekday morning and afternoon peak volume hours recorded at all the Town’s signalized
intersections and Sea Pines Circle. The repo rt includes mitigation recommendations for
intersections found to be non-compliant with the operational goals outlined in LMO Section
16-5-106.C. The only intersection found deficient relative to these goals in July 2025 was that
of William Hilton Parkway with Squire Pope Road and Chamberlin Drive during the weekday
afternoon peak volume hour.
Continuous traffic counts conduc ted on the Town’s major ar terials over a consecutive
Tuesday, Wednesday, and Thursday in July 2025 showed a 4.0 percent decrease in demand
compared to counts from July 2024, which marked the highest annual visitor-season counts
ever recorded by the Town. The second- and third-highest visitor-season counts were
recorded in July 2021 and July 2023, respectively. Nevertheless, the July 2025 counts were
Page 31 of 138
Page 2 of 3
still 6.7 percent higher than those from July 2020, resulting in an annual increase of 1.3% over
the recent five-year period.
Due largely to the end of toll collections on the Cross Island Parkway on June 30, 2021, traffic
counts taken by the Town between the bridges to the mainland and Coligny Circle via the
Cross Island Parkway, Palmetto Bay Road, and Pope Avenue have all shown a net increase
over the most recent five-year period. In contrast, each count station on William Hilton
Parkway between its interchange with the Cross Island Parkway and Sea Pines Circle has
experienced a net decrease during this same time.
Morning and afternoon peak-hour demand on the Town’s signalized intersections decreased
by 1.9 percent during the morning peak hour and 3.9 percent during the afternoon peak hour
compared with July 2024. Peak-hour demand at Sea Pines Circle also declined relative to
July 2024, decreasing by 0.7 percent during the morning peak hour, 2.0 percent during the
midday peak hour, and 4.2 percent during the afternoon peak hour.
Compared with July 2024, several inters ections along William Hilton Parkway between
Whooping Crane Way/Indigo Run Drive and the Shelter Cove area experienced increases in
morning peak-hour demand, while other inte rsections throughout the Town recorded
decreases. Nearly all intersections within the Town experienced reductions in afternoon peak-
hour demand in July 2025 comp ared with July 2024. Notable exceptions included the
intersections of William Hilton Parkway at Gum Tree Road and Wilborn Road/Jarvis Park
Drive, as well as the pedestrian signal on South Forest Beach Drive near Coligny Circle.
Demand on the Cross-Island Parkway and Palmetto Bay Road has increased by an effective
22.3 percent since the end of toll collections in June 2021. Approximately 38 percent of on-
and off-island traffic is using the Cross Island Parkway versus Wm. Hilton Pkwy., compared
with 31.5 percent before the end of toll collections. July 2025 counts indicate traffic demand
on William Hilton Parkway between the Spanish Wells Road/Wild Horse Road signal and the
Cross Island Parkway interchange continues to divide approximately 62 percent to 38 percent
in favor of William Hilton Parkway over the Cross Island Parkway.
BACKGROUND:
Section 16-2-103.J.10 of the LMO provides that this report will be prepared and submitted
annually to the Planning Commission for their review and discussion at a public meeting.
The report is based on traffic counts that are collected annually by the Town each July on
typical weekdays, Tuesday through Thursday. The 24-hour arterial counts reflected in
the report were collected from Tuesday, July 8 th through Thursday, July 10 th, 2025, and
all of the intersection turning movement counts were collected on Tuesday, July 8th, 2025.
The counts were certified by the LMO Official as required by Section 16-2-103.J.10.b on
January 6th, 2025.
Upon their certification in th is regard, the traffic counts summarized herein became the
Town’s background dataset for existing traffic demand for use by staff, consultants, and
development applicants in thei r preparation of Traffic Impac t Analysis Plan studies that
are required to be submitted to the Town as part of the development review process.
Page 32 of 138
Page 3 of 3
ATTACHMENTS:
1) 2025 Traffic Monitoring and Evaluation Report
Page 33 of 138
]EINFRASTRUCTURE
• CONSULTING & ENGINEERING
To:
From:
Via:
Cc:
Date:
Re:
Theresa McVey, Traffic Operations Manager, Town of Hilton Head Island
Darrin A. Shoemaker, P.E., PTOE, Senior Traffic Engineer
Infrastructure Consulting & Engineering ~,,,· ~,,.,,
Bryan Mcllwee, P.E., Project Manager,
Infrastructure Consulting & Engineering
May 28th, 2026
-~~
~v
f &.J~-♦~ ~r -. - •
;*:er ~~ }*;"
~ a ~.: ~~
~ ~ '. w ~t~. ·· ffe.:-, .. ~~ .•~\t-t ,.: .
-1. SHO~ :·' ... ,,,,, \\'. .
2025 TRAFFIC MONITORING AND EVALUATION REPORT
PART ONE - EXECUTIVE_SUMMARY
The Town collected three days of 24-hour bi-directional traffic counts at ten
locations on designated major arterials in July 2025 from Tuesday, July 8th through
Thursday, July 10th, 2025. Based exclusively on these 24-hour counts, aggregate
demand decreased 4.0 percent over the comparable traffic counts collected in July
2024, which yielded the highest aggregate volume count in the Town's history. The
effective annual rate of increase in traffic demand recorded via these counts during the
most recent five-year period from 2020 to 2025 is 1.3%, although it should be noted
that the annual counts conducted in 2020 were atypically depressed due to the onset of
the COVID-19 pandemic. The July 2025 count in aggregate represented a decrease
over that recorded each year from 2021 through 2024. It should also be noted that the
Town historically conducted these counts in June through 2022 and began recording
them in July in 2023 due to an LMO revision enacted shortly before then. An
examination of traffic counts taken since 2020 has shown that average daily traffic
during the month of July typically differs by less than half of one percent from that
recorded during the month of June, so relevant comparisons may still be made
between the July counts recorded annually since 2023 and those previously recorded
in June. The 24-hour counts taken on major arterials on Tuesday, July 8th, through
Thursday, July 10th, 2025, were 4.0 percent lower than the comparable counts made
one year earlier in July 2024, again the highest annual visitor-season counts ever
recorded by the Town. The second- and third-highest visitor-season counts recorded
by the Town were in July 2021 and July 2023, respectively. The July 2025 count was
still 6.7 percent higher than that recorded five years previous in 2020, however,
181 Bluffton Road, Suite C-102 I Bluffto n, SC 29910 I 843-485-3560 (P) I www .ice-eng.com
An Equal Opportunity Employer
Page 34 of 138
]EINFRASTRUCTURE
· CONSULTING & ENGINEERING
resulting in the effective 1.3% annual increase during the most recent five-year period.
Due largely to the cessation of toll collections on the Cross Island Parkway on June
30th, 2021, each of the counts taken by the Town between the bridges to the mainland
and Coligny Circle via the Cross Island Parkway, Palmetto Bay Road, and Pope
Avenue has experienced a net increase during the most recent five-year period, while
each count station on William Hilton Parkway between its interchange with the Cross
Island Parkway and Sea Pines Circle has experienced a net decrease during this time.
The Town also collected 13-hour turning movement counts from 6:00 a.m. until
7:00 p.m. at all signalized intersections within the Town and at Sea Pines Circle on
Tuesday, July 8th, 2025. The morning and afternoon peak volume hours, as well as the
midday peak volume hour at Sea Pines Circle, were isolated from these counts. These
intersection turning movement counts in aggregate decreased 1.9 percent and 3.9 in
the morning and afternoon peak volume hour, respectively, from those recorded in July
2024. Peak volume hour demand on Sea Pines Circle decreased 0.7 percent, 2.0
percent, and 4.2 percent from July 2024 during the morning, midday, and afternoon
peak volume hours, respectively. Compared with July 2024, many of the intersections
on William Hilton Parkway between Whooping Crane Way/Indigo Run Drive and the
Shelter Cove area experienced an increase in morning peak volume hour demand
while other intersections within the Town experienced a decrease. Nearly all of the
intersections within the Town experienced a decrease in afternoon peak volume hour
demand in July 2025 compared with July 2024, with the intersections of William Hilton
Parkway with Gum Tree Road and Wilborn Road/Jarvis Park Drive as well as the
pedestrian signal on South Forest Beach Drive near Coligny Circle being notable
exceptions .
South Carolina Department of Transportation (SCOOT) figures for 2025
calendar-year-average daily traffic demand on various roadway segments under their
ownership and maintenance jurisdiction within the Town have been released. This
data shows a 0.5 percent decrease in demand on the bridges connecting the Town to
the mainland from 57,100 to 56,800 in 2025 compared with 2024. This daily average
figure was 51,400 in 2020, reflecting a total increase of 10.5 percent during the most
recent five years and equating to an effective increase of 2.0 percent per year. The
most recent ten years of data, comparing 2025 with 2015, show a nominal increase of
3.8 percent during this period, or an effective annual rate of increase of 0.4 percent.
Measurements of the total calendar year traffic demand on US 278 on Jenkins Island
made with the SCDOT's continually-operating traffic volume counter show a decrease
of approximately one-third of one percent in 2025 from 2024, but an increase of 6.8
percent, or 1.3 percent per year during the most recent five-year period. During the
most recent ten-year period from 2015 to 2025, these daily counts on Jenkins Island
have nominally risen 1.6 percent, or approximately 0.2 percent per year.
181 Bluffton Road, Suite C-102 I Blufft on, SC 29910 I 843-485 -3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
2
Page 35 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
Based on traffic demand figures reported by the Federal Highway Administration
(FHWA), total traffic demand nationwide increased 1.7 percent in July 2025 compared
with July 2024. Demand in the state of South Carolina was up 3.6 percent in July 2025
compared with July 2024, and increased 2.1 percent in the nation's South Atlantic
region, consisting of all coastal states from Delaware to Florida, as well as West
Virginia and the District of Columbia.
Based on the July 2025 figures reported in Table One on page 9, traffic demand
on the Cross Island Parkway and Palmetto Bay Road has increased 22.3 percent over
the comparable figures recorded in June 2021 prior to the cessation of toll collections
on the Cross Island Parkway. The counts in Table One indicate that bi-directional
traffic demand on William Hilton Parkway between the Spanish Wells Road/Wild Horse
Road signal and the Cross Island Parkway interchange continues to divide
approximately 62 percent to 38 percent in favor of William Hilton Parkway over the
Cross Island Parkway, although this has changed from a typical 68 percent to 32
percent split in favor of William Hilton Parkway prior to the end of Cross Island Parkway
toll collections. The 62 percent to 38 percent split in favor of William Hilton Parkway
over the Cross Island Parkway has been consistent and appears to have stabilized in
the years since toll collections on the Cross Island Parkway ended.
The only intersection that was analyzed as being out-of-compliance with the
Town's operational goals as outlined in the Land Management Ordinance (LMO) in July
2024 was the intersection of William Hilton Parkway with Squire Pope Road/
Chamberlin Drive during the afternoon peak volume hour. This intersection has been
identified as being deficient relative to operational goals during the afternoon peak
volume hour for many years due to the inability of the two westbound through lanes
departing the intersection to afford sufficient capacity to accommodate the heavy off
island demand that occurs in the afternoon. The intersection of William Hilton Parkway
with Gum Tree Road and the opposing Cross Island Parkway on/off ramps was
compliant with the Town's operational goals during the morning and afternoon peak
volume hours, but was analyzed as being borderline compliant during the morning peak
volume hour. A brief discussion of both intersections, including potential mitigative
improvements, is undertaken in Part Seven of this report on page 18.
PART TWO - INTRODUCTION
As required by Section 16-2-103.J.10 of the Town's LMO, this report will
summarize July 2025 traffic volume demand on the Town's major roadway
network and recommend improvements to mitigate operating conditions identified as
181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-en g.com
An Equal Opportunity Employer
3
Page 36 of 138
]EINFRASTRUCTURE
• CONSULTING & ENGINEERING
being non-compliant with the Town's adopted operational goals, which are outlined in
Section 16-5-106.C of the LMO. The minimum requirements for this report are codified
in Section 16-2-103.J.10 as follows:
1) Summary of weekday morning and afternoon peak hour turning movement counts
for all signalized intersections within the Town
2) Summary of twenty-four hour volume demand on the Town's major arterial network
3) Historical trends relative to the most-recent five year period
4) Description of existing operating conditions as compared with the adopted traffic
goals by utilizing the analysis methodology outlined in the current (2022) edition of
the Transportation Research Board's Highway Capacity Manual (HCM), and how
these conditions have changed since the previous year's Traffic Monitoring and
Evaluation Report, and
5) Recommendat ions on improvements to mitigate any intersections found to be
operating out of compliance with the Town's goals.
The Town's adopted traffic goals for signalized intersections are outlined
in Section 16-5-106. C of the LMO and state that each such intersection within the Town
should operate at a volume-to-capacity ratio of 0.9 or lower and that motorists at each
intersection must experience an average total delay-per-vehicle of 55.0 seconds or less
during both the morning and afternoon peak hours of an average weekday in July,
criteria that are applicable to the intersection's operation as a whole. The LMO also
outlines operational goals for roundabout intersections, and requires analysis of Sea
Pines Circle in calendar years that are evenly divisible by two. The Town often counts
and analyzes Sea Pines Circle annually to exceed this codified requirement given the
keen public interest in assessments of this unique intersection. Hence, analysis of Sea
Pines Circle is included in Part Five of this report on pages 13 and 14.
In August of 2025, Town Council revised Section 16-2-103.J of the Land
Management Ordinance to expand the standards that signalized intersections and
roundabouts are required to meet to include that the level of service (LOS) associated
with any individual traffic movement does not decline by more than one level nor to
LOS F. A brief discussion on intersections that are non-compliant based exclusively on
declining or failing LOS's associated with individual traffic movements is included in
Part Seven of this report.
This report will examine the morning and afternoon weekday peak hour
turning movement demand at signalized intersections within the Town in accordance
with the definition of "peak hour" given in Section 16-10-105 of the LMO, which requires
that the morning weekday and afternoon peak hour be identified within the two-hour
period from 7:00 to 9:00 a.m. and 4:00 to 6:00 p.m., respectively. The LMO requires
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P} I www .ice-eng.com
An Equal Opportunity Employer
4
Page 37 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
that this report be based on data collected on a typical July weekday. This enables the
analyst and reader to identify deficiencies and base design recommendations on traffic
volume demand that approximates typical visitor season demands.
The Town retained a traffic counting contractor to collect the data on three
consecutive weekdays beginning on Tuesday, July sth , 2025. All of the morning and
afternoon peak hour turning movement count data for signalized intersections and Sea
Pines Circle summarized in Appendix A was collected on the first of these three days,
Tuesday , July 8th, 2025. One additional unsignalized intersection, that of Palmetto Bay
Road with Dunnagans Alley, was counted on Wednesday , July 9th, at the request of the
Town. Bi-directional 24-hour counts were conducted at strategic locations on the
Town's network of major arterials from midnight beginning Tuesday, July 81h, through
midnight ending Thursday, July 10th, to collect three representative weekdays of data.
An average demand for these three days is shown in Table One on page 9. Town staff
typically monitors traffic conditions on these dates to ensure that the collected data is
not influenced by atypical events such as adverse weather, road construction, or
unforeseen incidents such as traffic collisions. As required by the LMO, this report
includes historical data for these 24-hour counts for the most recent five-year period.
All of the traffic counts collected in July 2025 were judged by the engineer of record to
be consistent with expectations based on historical data, and none of the collected data
was judged aberrant or unsuitable for analysis purposes.
The operational goals for all signalized intersections as outlined in Section
16-5-106.C of the LMO are based on the intersection's volume-to-capacity (vie) ratio
and the average total delay experienced by motorists as a result of operating conditions
during the weekday morning and afternoon peak traffic-volume hours. The volume-to
capacity ratio is essentially a percentage of the intersection's capacity to discharge
traffic that is being utilized by all motorized and non-motorized traffic. The denominator
in this ratio ("c"), the signalized intersection's capacity, is dependent to a large extent
on the lanes available at the intersection and their assignment to individual traffic
movements, geometrics such as lane width, storage length, turning radii, signal timing,
and the frequency of conflicting bicycle and pedestrian movements. Other factors
affecting capacity are more subtle, such as unequal distributions of traffic demand on
multiple lanes serving the same traffic movement due to a lane terminating a short
distance downstream from the intersection, and the influence on operations from other
nearby traffic signals. The numerator in the ratio (''v'') is basically the intersection's
hourly vehicular demand adjusted to account for a variety of factors such as variability
in demand within the peak volume hour and the percentage of heavy vehicles in the
traffic stream.
181 Bluffto n Road, Suite C-102 I Bluffton , SC 29910 I 843-485- 3560 {P) I www .ice-eng.com
An Equal Opportunity Employer
5
Page 38 of 138
]EINFRASTRUCTURE
• CONSUL TING & ENGINEERING
One of the Town's operational goals for signalized intersections is a v/c ratio in
indicating that the total volume demand on the intersection is not exceeding 90 percent
hours. This percentage is expressed as a decimal fraction in Tables Six and Seven on
pages 16 and 17. The other operational goal for signalized intersections is an average
total delay of 55.0 seconds or less experienced by all motorists passing through the
entire intersection during both the morning and afternoon peak volume hour. The 55.0-
second average delay figure is the maximum average delay at the intersection as a
whole that is indicative of level of service D for signalized intersections in the Highway
Capacity Manual, a measure of operational effectiveness that is commonly considered
by traffic engineers to be the effective limit of acceptable operations during peak
volume hours in urban or developed areas. It should be noted that total delay
experienced by a motorist at an intersection includes, but is not limited to, the time that
a motorist is physically stopped in traffic. Delay may also accrue when a motorist is
moving forward, such as that which occurs during deceleration or subsequent
acceleration back up to the background running speed. The total delay experienced by
a motorist at a traffic signal is the actual time required to pass through the intersection,
from the time that a motorist brakes in advance of queued traffic until free-flow speed is
reestablished on the downstream side of the intersection, less the time that would've
been required to traverse the roadway segment at free-flow speed if no intersection,
traffic signal, or conflicting traffic were present to impede flow. Total delay is therefore
experienced by motorists forced to slow for congestion in traversing an intersection,
even if they are able to pass through the intersection without stopping. Total delay is
generally not experienced by motorists who arrive at an intersection on a green signal
and pass through the intersection at free-flow running speed without slowing.
Each time that a traffic signal changes, one group of motorists must come to a
stop while flow must be reestablished on a different group of traffic lanes. There are
routinely a couple of seconds where no one at all is moving. Therefore, a signalized
intersection's capacity can theoretically be increased by changing traffic signals less
frequently and minimizing starts and stops. Traffic signals within the Town change less
frequently, typically every two to three minutes, during peak volume hours in order to
help ensure that capacity is increased and that the Town's capacity-based operating
goals are met. Changing signals less frequently to increase capacity, however, means
that motorists will be confronted with longer red signals, and this typically increases the
average delay experienced by motorists. Therefore, the Town's operational goals
counterbalance each other in a way that ensures that capacity is not inordinately
reduced by changing traffic signals too frequently , nor delay inordinately increased by
changing them too infrequently.
As stated on page 4, an intersection may also be considered non-compliant with
the LMO operational standards if the level of service (LOS) for any individual traffic
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
6
Page 39 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
movement declines by more than one LOS, expressed as a letter grade from A through
F, or to LOS F. While this operational standard appears to have been intended
primarily to identify intersections that are rendered non-compliant as the result of
proposed development, a discussion on intersections that are non-compliant with this
standard is included in Part Seven of this report.
PART THREE - TURNING MOVEMENT COUNTS AT SIGNALIZED
INTERSECTIONS - JULY 2024 PEAK VOLUME HOURS
Turning movement counts for all 27 signalized intersections within the Town were
conducted from 6:00 a.m. to 7:00 p.m. on Tuesday, July ath, 2025. The peak hours
identified from these turning movement counts, as well as a similar 13-hour count made
at Sea Pines Circle, are summarized in diagrammatic form in Appendix A. Demand for
each individual traffic movement during the identified morning and afternoon peak
volume hours, including U-turns, is shown. Separate counts of off-road pedestrians
and bicyclists crossing each intersection street approach were also collected and are
shown on the diagrams opposite their respective approach. A count of on-road
bicyclists is included for each street approach. The total intersection volume demand,
including all pedestrians and bicyclists, is shown for each intersection's morning and
afternoon peak hours in the center of the diagram, along with the comparable July 2024
figure and the percentage change from July 2024 to July 2025, rounded to the nearest
tenth of one percent. This one-year percentage change in the entire intersection
demand is also summarized in Table Three on page 11. For purposes of consistency,
the on-island direction of William Hilton Parkway is shown on the right side of each
diagram for intersections on this arterial, and the compass in the lower-right side of the
diagram is rotated to indicate true north. For the diagrams that show Sea Pines Circle
or intersections on Pope Avenue or Palmetto Bay Road, the off-island direction toward
the Cross Island Parkway that approximates true north is shown at the top of the
diagram.
PART FOUR -AVERAGE DAILY DEMAND ON MAJOR TOWN
ARTERIALS AND INTERSECTIONS
Average 24-hour bi-directional traffic demand at strategic locations on major
arterials within the Town as counted on Tuesday, July ath, through Thursday, July 10th,
2025 is shown in Table One on page 9. Comparable figures are also shown for each of
the ten count locations for each year from 2020 through 2024, enabling five-year
comparisons. The effective annual rate of change for the 2020-2025 period is shown in
the far-right column for each location. The reader should keep in mind that traffic
demand was significantly depressed in 2020 due to the COVID-19 pandemic, and that
181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice -eng.com
An Equal Opportunity Employer
7
Page 40 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
this depressed demand in 2020 is reflected in Table One and in the effective annual
rates of increase shown in the far-right column. In Table One, the words "east" or
"south" refer to the on-island side of the referenced intersection, and the word "west"
refers to the off-island side of the intersection. A map showing the location of each
count location in Table One is included as Appendix B of this report.
The total 24-hour traffic volume counted by the Town in July 2025 as shown in
Table One, was 4.0 percent less than that counted by the Town in July 2024, which
was the highest demand ever recorded by the Town during the annual visitor-season
counts. The total demand measured in July 2025 was 6.7 percent higher than that
counted five years ago in June 2020, resulting in the effective aggregate annual rate of
increase of 1.3 percent that is shown in the far-right column in Table One's bottom row.
Table Two on page 10 shows calendar year average daily demand supplied by
the South Carolina Department of Transportation (SCOOT) for US 278 crossing
Jenkins Island for each year from 2020 through 2025. These and other SCOOT
recorded calendar year averages, or MOT's , are shown for a variety of locations
throughout the island in Appendix D. The Town's July 24-hour counts typically
generate figures that are approximately ten percent higher than the SCDOT's calendar
year averages. The total increase in the SCDOT's calendar year average of traffic on
US 278 crossing Jenkins Island for the five years from 2020 to 2025 is 6. 7 percent,
equating to an effective annual rate-of-change of 1.3 percent during that time.
The table that is included as Appendix D to this report reflects total bi-directional
demand crossing Jenkins Island on William Hilton Parkway for each day in calendar
year 2025. The average daily demand of 55,134 vehicles per day shown at below right
in this table considers all traffic crossing Jenkins Island in total during calendar year
2025, a figure that declined 0.35 percent from the average of 55,325 vehicles per day
recorded in calendar year 2024.
181 Bluffto n Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
8
Page 41 of 138
][INFRASTRUCTURE
CONSULTING & ENGINEERING
TABLE ONE
24-HOUR Bl-DIRECTIONAL TRAFFIC DEMAND ON MAJOR ARTERIALS -
JUNE 2020-2022 AND JULY 2023-2025*
Map 5-year
Ref. Location 2020 2021 2022 2023 2024 2025 %change/~r .
1) Wm. Hilton Pkwy . at J. Wilton Graves Br. 58,973 63,304 61 ,628 63,434 63,861 62,444
2) Wm. Hilton Pkwy. west of Cross Is. Pkwy . 49,660 56,270 56,492 57,287 59,513 57,475
3) Wm. Hilton Pkwy . east of Whoop ing Crane 42,120 46,901 41 ,679 40,913 43,321 40,878
4) Wm. Hilton Pkwy . east of Coggins Pl. Rd. 30,655 34,758 29,282 28,146 29,260 27,713
5) Wm. Hilton Pkwy. west of Queens Folly Rd 39,361 43,806 36,678 37,202 36,886 35,263
6) Wm. Hilton Pkwy . west of Arrow Road 26,347 29,682 26,310 26,336 26,131 24,020
7) Pope Avenue south of New Orleans Rd. 31,709 34,156 32,569 34,514 33,373 32,102
8) Palmetto Bay Rd. south of Pt. Comfort Rd. 26,029 27,661 32,634 34,564 34,060 32,785
9) Cross Island Pkwy . south of W. Hilton Pkwy . 16,593 17,734 20,905 22,326 22,910 22,022
10) Cross-Island Pkwy. at Chas. Fra.ser Bridge 26,421 29,256 34,990 37,881 37,362 36,526
TOTAL OF ALL TEN STATIONS 347,868 383,528 373,167 382,603 386,677 371,228
Compos ite Rate of Change - 2024-2025 =
Composite Rate of Change - 2023-2024 =
Effective Composite Annual Rate of Change - 2020-2025 =
-4.0%**
+1.1% ••
+1.3%**
+1.2
+3.0
-0.6
-2.0
-2.2
-1.8
+0.2
+4.7
+5.8
+6.7
+1.3
*The Town began taking its annual traffic counts In July instead of June in 2023 due to a Land Management
Ordinance (LMO) revision.
**All three rates based exclusively on the data presented in Table One
It should be noted that the 24-hour counts taken by the Town and summarized in
Table One are located in a manner that enables the calculation of the proportion of
motorists that use the Cross Island Parkway as opposed to William Hilton Parkway.
Count station number two is taken on William Hilton Parkway just east of the Spanish
Wells Road/Wild Horse Road signal, and station number nine is located on the Cross
Island Parkway overpasses just east of their merge into William Hilton Parkway.
Hence, the number of motorists using William Hilton Parkway instead of the Cross
Island Parkway is the total of count station two less that of count station nine. During
July 8th-10th, 2025, the average daily vehicle demand on the Cross Island Parkway was
22,022 vehicles, while the combined total of William Hilton Parkway and the Cross
Island Parkway just east of Spanish Wells Road was 57,475 vehicles. Hence, (57,475
- 22,022 =) 35,453 of these vehicles, or nearly 62 percent, used William Hilton
Parkway. 22,022 vehicles, or 38 percent, used the Cross Island Parkway.
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
9
Page 42 of 138
]EINFRASTRUCTURE
. • CONSULTING & ENGINEERING
Demand on William Hilton Parkway is 77 percent higher than that on the Cross Island
Parkway just east of the point where they divide. The 62 percent of motorists using
William Hilton Parkway versus 38 percent using the Cross Island Parkway has
rebalanced from 68 and 32 percent, respectively, prior to the cessation of toll collection
on the Cross Island Parkway on June 30th, 2021, and appears to have stabilized.
TABLE TWO
SCOOT 24-HOUR AVERAGE Bl-DIRECTIONAL DEMAND ON JENKINS ISLAND
2015-2025 (calendar year average -AADT)
2015 - 54700
2020 - 51400
2021 - 57400
2022 - 57400
2023 - 57900
2024 - 57100
2025 - 56800
% change 2024 - 2025 :
% change 2023 -- 2024:
Avg. annual rate of change 2020 - 2025:
Avg. annual rate of change 2015 - 2025:
-0.5%
-1.4%
+2.0%
+0.4%
This annual average daily demand has increased 10.5 percent from the average
recorded in 2020, equating to an average annual rate-of-change of 2.0 percent during
the most recent five-year period as shown in Table Two above.
The information in Appendix E is a report released by the Federal Highway
Administration (FHWA) in August 2025 that summarizes levels of and trends in volume
demand on roadways nationwide, regionally, and within the state of South Carolina
during July 2025. The report indicates that total vehicle-miles traveled in the United
States was up 1.7 percent in July 2025 compared with July 2024, and indicates that
total vehicle-miles travelled (VMT) in the state of South Carolina in July 2025 increased
3.6 percent relative to July 2024. The FHWA's South Atlantic region of the United
States, comprised of all states on the Atlantic seaboard from Delaware south to Florida,
as well as West Virginia and the District of Columbia, experienced an increase of 2.1
percent in VMT from July 2024 to July 2025.
Table Three on page 11 shows the total combined vehicular, bicycle, and
pedestrian morning and afternoon peak volume hour demand on each of the Town's
twenty-seven signalized intersections and Sea Pines Circle in July 2025, as well as the
comparable July 2024 figure and one-year percentage change.
181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485 -3560 {P) I www.ice-eng.com
An Equal Opportun ity Employer
10
Page 43 of 138
][INFRASTRUCTURE
CONSULTING & ENGINEERING
A midday count was conducted at Sea Pines Circle based on historical counts
that indicate that midday demand far exceeds morning peak hour demand. In July
2025, 3,445 motor vehicles were recorded entering Sea Pines Circle during the midday
peak volume hour, compared with 2,872 that entered during the traditional morning
peak volume hour. Based exclusively on the data contained in Table Three, total
aggregate demand at signalized intersections within the Town and Sea Pines Circle
decreased 1.9 percent and 3.9 percent from July 2024 to July 2025 during the morning
and afternoon peak volume hours, respectively. The total demand entering Sea Pines
Circle decreased from July 2024 during each of the morning, midday, and afternoon
peak volume hours.
TABLE THREE
PEAK HOUR SIGNALIZED INTERSECTION VOLUME - JULY 2024-2025
AM PM
202~ Vol. ~024 Vol. ¾~be, 222~ Y2'- 2224 VQI. ¾Cbg.
William Hilton Pkwy. / CrosstrH Drive 4103 - 4887
WIiiiam Hilton Pkwy./ Squire Pope Rd. 4224 4310 -2.0 4904 15047 -2.8
WIiiiam HIiton Pkwy./ Spanish Wells Rd. 39155 4243 -6.8 4385 4693 -6.6
William Hilt.on Pkwy./ GumtrH Rd. 3356 3379 -0.7 4377 4251 +3.0
William HIiton Pkwy./ Wilborn Rd. 2865 2956 -3.1 3595 3570 +o.7
William HIiton Pkwy./ Pembroke Dr. 2756 2894 -4.8 3421 3430 -0.3
William HIiton Pkwy./ Whooping Crane W;:iy 3175 30158 +3.8 3450 3845 -10.3
William HIiton Pkwy. / Beach City Rd. 2780 2963 -6.2 3357 3512 -4.4 William Hilton Pkwy./ Mathews Dr. (north ) 2577 2550 +1.1 3351 3473 -3.5 Willi;:im HIiton Pkwy ./ Dillon Rd. 2253 2161 +4.3 2853 2959 -3.6
William HIiton Pkwy./ Coggins Point Rd. 1901 1831 +3.8 2534 2603 -2.7
William Hilton Pkwy./ Buchwood Dr. 1507 1621 -7.0 2112 2229 -5.2
William Hilton Pkwy./ Mathews / Folly Field 2371 2413 -1.7 3144 3314 -7.1
William Hilton Pkwy. / Singlet on Beach Rd. 2048 2016 +1.6 2805 2863 -2.0 William HIiton Pkwy./ Sh. Cove Ln. (off-is.) 1958 1940 +0.9 2721 2776 -2.0
William Hilton Pkwy. / Sh. Cove Ln. (central) 1977 19152 +1.3 2831 2936 -3.6
William Hilton Pkwy ./ QuHns Folly Rd. 2265 2304 -1.8 3240 3407 -4.9
WIiiiam HIiton Pkwy. / QuHns Way 1694 1711 -1.0 2236 21117 -11.2
William Hilton Pkwy ./ Shipyard / Wexford 1830 1843 -0.7 2657 2802 -5.2
William Hilton Pkwy ./ New Orleans Rd. 1655 1687 -7.8 2322 2542 -8.7
William HIiton Pkwy./ Arrow Rd. 1583 1598 -0.9 2087 2319 -10.0
Pope Ave. I New Orleans / Office Park 1863 2012 -7.4 2894 3099 -6.6
Pope Ave. I &,oq:IJJl9 Pkwy. 1760 1784 -1.3 21117 21577 -2.3
Pope Ave. / Lagoon Road 1072 1017 +5.4 16118 1736 -4.5
South Forest Beach Drive Pedestr ian Signal 600 645 -7.0 1119 1107 +1 .1
Palmetto Bay Rd. / Target Rd. 2315 2380 -2.7 2964 2964 0.0
Palmetto Bay Rd. / Arrow / Point Comfort 2555 2711 -5.8 3273 3327 -1.6
Sea Pines Circle 2872 2892 -0.7 3514 3668 -4.2
TOTAL" 61667 62871 ·1.9 80321 831566 -3.9
2!!2~ Vol. 2!!~ Y!i!I, '{q~be,
Sea Pines Circle Midday Peak Hour 34415 3515 -2.0%
"Total does not include the intersection of Wm Hilton Parkway/Crosstree Drive due to no comparable 2024 counts being
taken at this location I
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3S60 (P) I www.ice-eng.com
An Equal Oppor tunity Emplayer
11
Page 44 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
Off-road bicycle and pedestrian crossing demands at signalized intersections
within the Town as counted in July 2025 from 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to
6:00 p.m. decreased by 6.0 percent from those recorded in July 2024, and are 14
percent lower than those recorded in 2020. These demands increased sharply for
many years prior to 2020, when demand reached a peak during the COVID-19
pandemic, but have trended moderately downward since. Total off-road bicycle and
pedestrian demand recorded in July 2025 was, in aggregate, 14 percent lower than that
recorded in June 2020. Very high bicycle and pedestrian crossing demand at the
South Forest Beach Drive pedestrian signal near Coligny Circle is included in these
figures, and represented 31 percent of the total number of crossings recorded in July
2025. Notably, this pedestrian and bicycle crossing demand at this popular beach park
crossing increased 34 percent over that recorded in June 2020. While this crossing
demand is prone to wide variations due to weather and other factors, the significant
increase in demand on this signalized crossing has significantly offset more general
declines in demand at signalized intersections throughout the Town. Table Four below
and on page 13, shows the total off-street bicycle and pedestrian crossing demand
observed during the morning and afternoon (four-hour) peak volume period at each
signalized intersection for July 2025, July 2024, and June 2020. Only these four hours
were counted as recently as 2022, and are being considered to enable a direct
comparison to comparable demand recorded five years previous in 2020.
TABLE FOUR
OFF-STREET* FOUR-HOUR PEDESTRIAN / BICYCLE CROSSING DEMAND AT
SIGNALIZED INTERSECTIONS - _JUNE/JULY 2020-2025
July July June 5-yr. ¾ Chg.
2025 2024 2020 2020-2025
William Hilton Pkwy. / Crosstree Drive 0 NOT COUNTED
William Hilton Pkwy. / Squire Pope Rd. 3 1 0
William Hilton Pkwy. / Spanish Wells Rd. 5 22 12 -58
William Hilton Pkwy. / Gumtree Rd. 23 12 13 +77
William Hilton Pkwy. / Wilborn Rd. 21 18 20 +5
William Hilton Pkwy. / Pembroke Dr. 29 25 32 -9
William Hilton Pkwy./ Whooping Crane Way 0 2 3 -100
William Hilton Pkwy. / Beach City Rd. 39 66 29 +34
William Hilton Pkwy. / Mathews Dr. (north) 90 73 80 +12
William Hilton Pkwy. / Dillon Rd. 72 102 85 -15
William Hilton Pkwy. / Coggins Point Rd. 0 2 0
William Hilton Pkwy. / Beachwood Dr. 75 99 157 -52
William Hilton Pkwy. /Mathews/ Folly Field 132 155 194 -32
William Hilton Pkwy. / Singleton Beach Rd. 166 191 180 -9
(cont'd on page 13)
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485 -3560 (P) I www. ice-eng.com
An Equal Opportunity Employer
12
Page 45 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
William Hilton Pkwy./ Shelter Cove Lane (off-island) 48 69 64 -25
William Hilton Pkwy./ Shelter Cove Lane (central) 28 69 64 -56
William Hilton Pkwy. / Queens Folly Rd. 3 0 0
William Hilton Pkwy. / Queens Way 140 171 279 -50
William Hilton Pkwy./ Shipyard/ Wexford 26 44 35 -26
William Hilton Pkwy. / New Orleans Rd. 82 83 267 -69
William Hilton Pkwy. / Arrow Rd. 102 136 242 -58
Pope Ave. / New Orleans/ Office Park 189 231 403 -53
Pope Ave. / Cardillo Pkwy. 461 532 509 -9
Pope Ave. / Lagoon Road 907 851 914 -1
South Forest Beach Pedestrian Signal 1226 1157 915 +34
Palmetto Bay Rd. / Target Rd. 75 84 74 +1
Palmetto Bay Rd./ Arrow I Point Comfort 37 35 56 -34
TOTAL 3979 4233 4627 -14
*Off-street refers to pedestrians and bicyclists using sidewalks, pathways, or shoulders, not the roadway. Only
crossings occurring between 7:00 and 9:00 a.m. and 4:00 and 6:00 p.m. are included.
PART FIVE - SEA PINES CIRCLE
The Town conducted a turning movement count at Sea Pines Circle on Tuesday,
July 8th, 2025. As shown in Table Three on page 11, total traffic demand on the circle
decreased 0.7 percent during the morning peak volume hour over that recorded during
the previous count of the circle in July 2024. Total demand decreased by 2.0 and 4.2
percent from July 2024 during the midday and afternoon peak volume hour counts,
respectively. When all three peak volume hours are considered in aggregate, total
demand on Sea Pines Circle decreased 2.4 percent from that recorded in July 2024.
Compared with comparable figures recorded in July 2020, the July 2025 combined
peak hour demand was 4.5 percent lower.
The LMO operational goal for roundabout intersections such as Sea Pines Circle
is different from the operational goals applicable to signalized intersections, which
consider the entire intersection. For Sea Pines Circle, the LMO operational goal is
applicable to each specific approach to the roundabout intersection, and is a total delay
of 150.0 seconds or less per vehicle on each individual approach. Based on HCM
roundabout analysis of Sea Pines Circle and the counts collected in July 2025, the total
delay on each individual approach to Sea Pines Circle is shown in Table Five on page
14. The comparable figures resulting from analysis of the previous July 2024 count are
shown in parentheses for comparison.
181 Bluffton Road, Suite C-102 I Bluffto n, SC 29910 I 843-485-3560 (P) I www.ice-eng .com
An Equal Opportun ity Employer
13
Page 46 of 138
]EINFRASTRUCTURE
• CONSULTING & ENGINEERING
TABLE FIVE - JULY 2025 HCM ANALYSIS TOTAL AVERAGE DELAY PER
VEHICLE RESULTS ON APPROACHESTO SEA PINES CIRCLE (in seconds)
AM Peak Hour Midday Peak Hour PM Peak Hour
2025 2024 2025 2024 2025 2024
Greenwood Drive 128.2 (76.8) 50.9 (47.3) 59.0 (61.5)
Palmetto Bay Road 68.7 ( 49.2) 38.0 (27.1) 22.2 (19.2)
Pope Avenue 17.8 (13.4) 28.6 (23.4) 74.9 (52.2)
William Hilton Parkway 30.2 (17.0) 54.9 (34.8) 40.1 (37.0)
Based on the turning movement counts conducted at Sea Pines Circle in July
2025 and the resulting analyses summarized in Table Five, Sea Pines Circle was fully
compliant with the LMO-based operational goal in July 2025, as was the case in July
2024, although the increased total delay figure for Greenwood Drive during the morning
peak hour is notable.
PART SIX - DESCRIPTION OF OPERA TING CONDITIONS RELATIVE TO
ADOPTED SERVICE GOALS
Analyses of the Town's signalized intersections are based on the traffic volume
data collected during the morning and afternoon peak volume hours on Tuesday, July
8th, 2025. The analyses were conducted in accordance with the current (2022) edition
of the Transportation Research Board's Highway Capacity Manual (HCM) as required
by the LMO. It is important to note that the HCM methodology isolates the peak 15-
minute volume period within the hour being analyzed, and bases the analysis results on
conditions modeled within this peak 15-minute period, not the average condition
experienced during the entire peak volume hour. Hence, the analysis results shown in
Tables Six and Seven on pages 16 and 17 are based on the highest-demand 15-
minute period recorded within the peak volume hours that are summarized in the count
diagrams in Appendix A in accordance with the HCM methodology.
A summary of existing volume-to-capacity ratios and average total delay per
vehicle resulting from analyses conducted of morning peak hour conditions in July 2025
is shown in Table Six on page 16. Table Six also includes comparable results for July
2024, June 2020, and June 2015 to enable comparisons with analyses of conditions a
year ago, five years ago, and ten years ago. The same information for the afternoon
peak hour is summarized in Table Seven on page 17. Values that are non-compliant
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
14
Page 47 of 138
]EINFRASTRUCTURE
CONSUL TING & ENGINEERING
with the Town's operational goals are shown in bold. Tables Six and Seven
do not include the pedestrian signal on South Forest Beach Drive near Coligny Circle,
as the HCM does not include an analysis methodology for exclusive pedestrian signals
of this type.
The HCM software outputs used to develop the analysis results summarized in
Tables Six and Seven are rather extensive and are not included in this report, but are
on file and available for review in the Town's Engineering office. The HCM software
outputs the average delay-per-vehicle in seconds at the intersection during the analysis
period but does not output the intersection's volume-to-capacity ratio, which must be
calculated by hand. Instructions for calculating this ratio are included in the HCM, and
a summary of each calculation appears on the reverse side of each respective software
output kept on file in the Town's Engineering office.
181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportun ity Employer
15
Page 48 of 138
][INFRASTRUCTURE
CONSULTING & ENGINEERING
TABLE SIX· MORNING PEAIC HOUR INTERSECTION VOLUME· TO-CAPACITY RATIOS
AND AVERAGE TOTAL DELAY IN SECONDS PER VEHICLE
JULY 2025 ANO COMPARABLE 2024, 2020, ANO 2015 FIGURES
2025 2024
Intersect ion vie dpv vie dpv vie
Wm. Hilton Parkway with Crosstree Drive/C He1nnchs Circle 0.83 13 7 NOT COUNTED
Wm. Hilton Parkway with Squire Pope Road/Chamberlin Drive 069 21 9 071 200 0.73
Wm. Hilton Parkway with Spanish Wells/Wild Horse Roads 059 14 5 0 61 16.3 069
Wm Hilton Parkway wrth Gum Tree Road/Cross-Island Parkway Ramps 072 533 0 70 46 8 0 71
Wm Hilton Parkway wnh Wilborn Road/Jarvis Park Dnve 059 4 1 0.59 5.6 059
Wm Hilton Parkway wrth Pembroke Drive/Museum Street 057 10 6 060 106 0 61
Wm H"dton Parkway wrth Whooping Crane Way/Indigo Run Drive 0 54 22 4 0 61 21 3 059
Wm Hilton Parkway with Beach City Road/Gardner Dnve 0 46 16 8 0 51 18 2 052
Wm Hilton Parkway wrth Mathews Dnve (northern 1rrtersectton) 043 26 2 0 46 285 049
Wm Hilton Parkway with Dillon Road/Plaza Dnve 0 48 170 045 176 049
Wm. Hilton Parkway wrth Coggrns Pomt Road 038 17 9 0.38 152 0.45
Wm. Hilton Parkway wnh Beachwood Dnve 030 1 8 0.29 1 4 034
Wm Hilton Parkway with Folly Field Road/Mathews Drive 045 22 t 040 21 9 0 47
Wm Hilton Parkway wrth Singleton Beach Road 0.43 33 040 44 0.50
Wm Hilton Parkway wrth Shelter Cove lane (off-island mtersect1on) 0 43 26 0.38 3 1 046
Wm Hilton Parkway with Shelter Cove lane (center intersection) 0 41 60 0 41 58 0 48
Wm HIiton Parkway wrth Queens Folly Road/King Neptune Way 037 265 037 239 0 47
Wm HIiton Parkway with Queens Way 036 47 036 49 0 40
Wm Hilton Parkway wnh Shrpyard/Wexford Dnves 0.42 19 7 040 16 7 0 43
Wm. Hilton Parkway with New Orleans RoadMllage at Wexford 033 88 035 9 1 0 36
Wm Hilton Parkway wrth Arrow Road 0 41 232 0 37 23 2 0 31
Pope Avenue wrth New Orleans/Office Park Roads 044 25 0 045 258 0.34
Pope Avenue with Gordillo Parkway 046 26 3 044 27 5 0 37
Pope Avenue wrth Lagoon Road/Beach Parking lot 0 21 12 7 0.18 99 020
Palmetto Bay Road with Target Road/Island Crossings Shopping Ctr 052 12 7 053 132 055
Palmetto Bay Road with Arrow/Point Comfort Roads 050 19 9 0 49 17 5 0 48
vie - Intersection Volume-tO-Capaclty Rauo
dpv • Average Total Delay-per-Veh1Cle In seconds
NOTE Operauonal condruons fal//ng 10 comply 1V1t11 goals sec rorrn tn rne LMO are sno,vn tn
181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-eng .com
An Equal Oppon unity Employer
2020 2016
dpv vie dpv
NOT S/GNAUZED
16 8 0.92 19 1
14 3 067 14 1
31 4 0.80 23.7
46 0 73 42
12 8 061 11 2
19 5 064 18 7
15 7 061 19 2
200 0 50 19 7
15 3 0 46 12 7
14 3 0.36 12 9
1 9 0 32 1 4
221 039 22 5
36 046 27
35 NOT SIGNAUZED
47 048 6.5
233 054 200
56 036 4 3
15 2 0 37 10 2
72 0 30 138
16 0 030 17 7
17 8 036 18 2
19.8 030 19 6
10.9 NOT SIGNALIZED
13 4 0.49 14 3
190 049 186
Page 16
Page 49 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
TABLE SEVEN· AITTRNOON PEAK HOUR INTERSECTION VOLUME·TO·CAPACITY RATIOS
ANO AVERAGE TOTAL DELAY IN SECONDS PER VEHICLE
JULY 2025 ANO COMPARABLE 2024, 2020, ANO 2015 FIGURES
2025 2024
Intersection vie dpv vie dpv
Wm Hilton Parkway wrth Crosstree Dnve/C Heinnchs Circle 089 9 1 NOTCOUWTED
Wm Hilton Parkway wnh Squire Pope Road/Chamberlin Dnve 1 .01 62.6 0.99 47 6
Wm Hilton Parkway with Spanish Wells/Wdd Horse Roads 066 276 065 229
Wm Hilton Parkway with Gum Tree Road/Cross-Island Parkway Ramps 0 72 480 069 534
Wm Hilton Parkway with Wilborn Road/Jarvis Park Dnve 0 71 14 8 0 70 12 5
Wm Hdton Parkway wnh Pembroke Dnve/r..luseum Street 066 24 5 065 21 7
Wm Hdton Park\vay with Whooping Crane Way/Indigo Run Dnve 0 70 21 3 0 70 198
Wm Hilton Park\vay with Beach Cny Road/Gardner Dnve 062 16 8 063 23 9
Wm Hilton Park\vay with Mathews Onve (northern 1ntersecuon) 058 289 063 339
Wm Hilton Park\vay with Dillon Road/Plaza Dnve 063 19 1 062 20 7
Wm Hilton Park\vay with Coggins Pomt Road 056 14 3 056 14 5
Wm Hilton Park\vay wnh Beachwood Onve 0 42 22 0 41 1 8
Wm Hilton Park\vay \Vlth Folly Fteld Roadll.tathews Onve 057 33 1 063 33 1
Wm HIiton Park\vay wrth Singleton Beach Road 046 36 0 50 43
Wm Hilton Park\vay wnh Shelter Cove Lane (off-island Intersect,on) 0 46 38 050 4 7
Wm Hilton Parkway wnh Shelter Cove Lane (center 1ntersect10n) 045 14 6 0 49 15 9
Wm Hilton Parkway with Queens Folly Road/King Neptune Way 0 51 304 055 31 7
Wm HIiton Parkway with Queens Way 040 48 0 47 60
Wm Hilton Park\vay with Shipyard/Wexford Onves 050 202 055 230
Wm Hilton Park\vay with New Orleans RoadNdlage at Wexford 0 59 226 065 228
Wm Hilton Park\vay wnh Arrow Road 049 34 3 056 43 6
Pope Avenue wrth New Orleans/Office Park Roads 057 309 063 336
Pope Avenue with Corddlo Park\vay 0 50 309 049 331
Pope Avenue with Lagoon RoadtBeach Parking Lot 0 40 231 0 39 23 4
Palmetto Bay Road with Target Road/Island Crossings Shoppmg Ctr 054 239 0 58 24 9
Palmetto Bay Road with Arrow/Point Comfort Roads 0 74 25 7 0 76 28 4
v i e • lnte~ecuon V01ume - t0-Capac1ty Rauo
dpv • Average Total Delay-per-verncle In secono.s
NO TE Operational con(Nt0ns t;;,rtmg to comply 111111 goa1s ser tonn 111 me LMO are snown in
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportu nity Employer
2020 2015
vie dpv vie dpv
NOT SIGNAUZED
1.13 79.9 1.10 58.5
0 75 234 0 79 252
0 72 34 7 088 26 1
070 10 3 0 75 64
067 200 073 262
0 75 18 6 082 19 4
0 72 24 2 0 71 12 2
066 206 068 28 8
066 12 7 067 14 1
0 61 10 4 059 16 7
050 1 8 048 1 8
065 26 9 065 26 3
055 38 0 46 40
054 46 NOT SIGNAUZED
055 12 3 064 160
067 28 7 0 81 44 7
066 72 056 77
064 21 4 056 15 4
064 170 0 57 27 8
046 28 8 0 48 22 3
057 238 062 296
053 24 9 061 24 1
050 31 8 NOT SIGNALIZED
0 51 22 4 0 59 23 5
066 26 7 072 26 1
Page 17
Page 50 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
As shown in Table Six on page 16, all signalized intersections within the Town
were found to be fully compliant with the dual LMO operational goals for signalized
intersections and operate at level of service (LOS) D or better during the morning peak
volume hour in July 2025, although the intersection of Wm. Hilton Parkway with Gum
Tree Road was close to being non-compliant based on an average total delay per
vehicle of 53.3 seconds, the highest average delay at any signalized intersection.
Table Seven on page 17 shows that the intersection of William Hilton Parkway with
Squire Pope Road and Chamberlin Drive was the only signalized intersection analyzed
as failing to meet the Town's operational goals during the afternoon peak volume hour
in July 2025, based on an intersection volume-to-capacity ratio of 1.01 and an average
total delay per vehicle of 62.6 seconds indicative of LOS E. A brief discussion of
mitigation for these intersections follows below in Part Seven.
PART S_EVEN - INTERSECTIONS OPERA TING OUT OF COMPLIANCE WITH
TOWN OPERATIONAL GOALS IN JULY 2025
WILLIAM HILTON PARKWAY WITH SQUIRE POPE ROAD AND CHAMBERLIN DRIVE
The intersection of William Hilton Parkway with Squire Pope Road and
Chamberlin Drive was found to be non-compliant with the maximum intersection
volume-to-capacity ratio LMO goal during the afternoon peak volume hour based on an
intersection volume-to-capacity ratio of 1.01, indicative of demand that slightly exceeds
the theoretical capacity of the intersection, and an average total delay-per-vehicle of
62.6 seconds per vehicle. These non-compliant figures for the afternoon peak hour
stem from the fact that the intersection has three lanes available to serve through traffic
in the eastbound direction, but only two westbound. There is also very heavy demand
on the southbound right turn from Squire Pope Road that is served by a single lane and
a YIELD condition, and the eastbound left turn onto Squire Pope Road that is served by
a single lane and signalized. The eastbound left turn is served by protected-permitted
left-turn phasing, meaning that the eastbound left turn is periodically served with a
green left-turn arrow and other times by a flashing yellow arrow that allows motorists to
turn left when an adequate gap in westbound traffic presents. Due to the constrained
westbound through flow and availability of only two lanes, the protected left-turn green
signal must be turned on for an interval that is as short as practical, and the permitted
flashing yellow arrow portion of the phase affords virtually no adequate gaps in
opposing traffic to turn left. The lack of gaps in westbound traffic flow also generates
inordinately long vehicle queues originating from the YIELD sign serving right-turning
motorists on Squire Pope Road, as the necessarily short green times provided to the
side streets and green arrow serving eastbound left turns are insufficient to serve the
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
18
Page 51 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
demand that may reach 16 vehicles or more per signal change.
The Town has retained a design consultant to make recommendations regarding
the mitigation of this intersection that has conducted a great deal of analysis on the
intersection and recommended a "scissors"-style, or "continuous green T" intersection
as an improvement that would eliminate the signal control presently afforded to low
volume Chamberlin Drive in favor of a STOP sign and limit this street to right-in/right
out ingress and egress. It is not this report's intention to duplicate or compare analysis
with the considerable analysis and associated recommendation proffered by the
consultant. But some alternate improvements that have been or are being considered
for this intersection were analyzed to measure their impact on operations and their
associated ability to mitigate the intersection relative to compliance with the Town's
operational goals, and these will be discussed.
The intersection was assessed by eliminating the YIELD condition serving right
turns from Squire Pope Road and adding a second right-turn lane, with right turns
controlled by the traffic signal. This improvement resulted in an intersection volume-to
capacity ration of 0.94, still non-compliant with the LMO goals. Providing a free-flowing
southbound right-turn via the construction of an adequately-designed acceleration lane
departing the intersection westbound successfully mitigated the intersection, but it is
recognized that this treatment has a significant impact on private property that is highly
undesirable. The provision of a second left-turn lane to serve eastbound turns onto
Squire Pope Road was assessed, but this improvement resulted in a still non-compliant
intersection with a volume-to-capacity ratio of 0.92, even when combined with the
aforementioned second right-turn lane added to Squire Pope Road's approach to the
signal. The provision of a future third westbound through lane without any other
improvements successfully mitigated the signal, however, resulting in a projected total
delay of 15.5 seconds per vehicle during the afternoon peak hour and reducing the
intersection's volume-to-capacity ratio to 0.82. It appears that, barring an improvement
that either provides a free-flowing right turn from Squire Pope Road or one that grade
separates the eastbound left turn onto Squire Pope Road and conveys it over the
westbound through movement to a new intersection on Squire Pope Road, widening to
provide a third westbound through lane through the intersection is the key to the long
term successful mitigation of this intersection and its operation in compliance with the
LMO goals during the afternoon peak hour.
WILLIAM HILTON PARKWAY WITH GUM TREE ROAD AND CROSS ISLAND
PARKWAY ON/OFF RAMPS
While this intersection was found to be operating in compliance with the LMO
operational goals in July 2025, the average total delay of 53.3 seconds per vehicle
181 Bluffto n Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www .ice-eng.com
An Equal Opportunity Employer
19
Page 52 of 138
]EINFRASTRUCTURE
I CONSULTING & ENGINEERING
shown in Table Six indicated that this congested intersection is very close to operating
out of compliance with the LMO's delay-based goal during the morning peak volume
hour. Additional analysis was conducted to develop an intersection improvement
recommendation that may render this intersection reliably compliant with the LMO
goals for several years into the future, particularly as traffic demands increase as a
result of nearby residential development that is under construction at the time of this
report. It has often been suggested that the third eastbound through lane that
previously existed at this intersection until circa 2010 should be restored. Analysis
shows that this improvement in itself would not successfully mitigate the intersection
unless the free-flowing right-turn lane serving northbound motorists exiting the Cross
Island Parkway is maintained. At up to 400 vehicles per hour, the demand on this right
turn is even higher than that on the right turn from Squire Pope Road, and analysis of
efforts to replace the existing free-flowing right turn with two right-turn lanes controlled
by the signal do not successfully mitigate the intersection. Conversely, the provision of
a second left-turn lane to serve each direction of William Hilton Parkway does
successfully mitigate the intersection, with the raised, landscaped channelizing island in
the intersection's southwest (Honey Horn) quadrant eliminated to accommodate two
departure lanes southbound and the channelizing island in the southeast (Jarvis Park)
quadrant retained to maintain the free-flowing northbound right turn. Notably, the
elimination of the channelizing island in the southwest quadrant would remediate a
channelized right-turn lane that was not designed to accommodate heavy vehicles, and
also enable the existing southbound right-turn lane on Gum Tree Road to be revised to
a shared through/right lane as was previously the case prior to approximately 2010.
While this would adversely impact the right-turn movement, particularly the ability to
turn right on a red signal from Gum Tree Road, the availability of two through lanes to
proceed onto the on ramp to the Cross Island Parkway from Gum Tree Road increases
the intersection's capacity and may reduce the length of green signal required to keep
Gum Tree Road from backing up into the Marsh Point Drive intersection that is likely to
experience increased demand in the near future.
OTHER INTERSECTIONS WITH POTENTIAL LMO COMPLIANCE ISSUES
BASED ON OPERATIONAL GOALS REVISED BY TOWN COUNCIL IN
AUGUST 2025
As referenced herein, Town Council modified the operational goals outlined in
Section 16-5-106. C of the LMO by enacting ordinance 2025-18 last August. This
ordinance added two additional goals to the longstanding capacity- and delay-based
operational goals described in this section. The two operational goals that were added
read as shown at the top of the following page in the LMO:
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunlt)I Employer
20
Page 53 of 138
][INFRASTRUCTURE
CONSULTING & ENGINEERING
4. The Level of Service (LOS) for any vehicular traffic movement does not
decline by more than one level per the requirement s of the Highway Capacity Manual
(HCM), nor to a Level of Service of "F"; and
5. The development causes safety issues or delays that require mitigation as
determined by the Town Engineer.
While the second of the two added operational goals is subjective and may be
applied at the discretion of the Town Engineer, the first addresses the level-of-service
(LOS) associated with individual traffic movements as assessed by the analyses
conducted for this report. Although these goals may have been added to the LMO by
Town Council to provide the Town with additional options to require mitigation by
development applicants, this report acknowledges the inclusion of 4. above in Section
16-5-106(C) relating to declines in LOS for individual traffic movements. This
recently-established goal requires that the LOS associated with any individual traffic
movement does not decline by more than one LOS, nor to LOS F, associated with an
average total delay per vehic le exceeding 80.0 seconds at signalized intersections or
50.0 seconds on roundabout approaches. This goal makes no distinction between
conventional signalized intersections and roundabouts in the LMO, and is applicable
to intersections in general.
Four instances of the LOS associated with an individual traffic movement
declining by more than one level (letter grade), one each at four different
intersections , in July 2025 compared with July 2024, were identified. Three of these
declines in LOS occurred during the afternoon peak hour and one, at Sea Pines
Circle, occurred during the morning peak hour. These four movements and the
change in their average total delay score are shown in Table Eight on page 22.
181 Bluffton Road, Suite C-102 I Bluffto n, SC 29910 I 843-485-356 0 (P) I www.ice-eng.com
An Equal Opp-0rtunlty Employer
21
Page 54 of 138
][INFRASTRUCTURE
CONSUL TING & ENGINEERING
TABLE EIGHT-INDIVIDUAL TRAFFIC MOVEMENTS DECLINING BY
MORE THAN ONE LEVEL OF SERVICE - JULY 2024 TO JULY 2025
AM/PM 2024 2025 Intersection Movement Peak
Hour dpv LOS dpv
Wm. Hilton Pkwy. Eastbound Left Turn
w/ Squire Pope Rd from Wm. Hilton PM 10.8 B 46.8
I Chamberlin Dr Pkwv.
Wm. Hilton Pkwy. Eastbound Wm. w/ Gum Tree Hilton Pkwy. Through PM 19.9 B 35.9
Rd./XIP Ramps
Pope Avenue w/ Southbound Right
Turn onto Cardillo PM 8.8 A 20.5 Cardillo Parkway Pkwv.
Wm. Hilton Pkwy.
Sea Pines Circle Entering Circulating AM 24.2 C 41 .2
Roadway
dpv - Average Total Delay per Vehicle in seconds
LOS
D
D
C
E
Eight intersections were analyzed as having one or more individual traffic
movements that declined from LOS E to LOS F in July 2025 compared with July
2024, five during the afternoon peak hour, and three during the morning peak hour.
These intersections and the individual traffic movements that declined to LOS F in
July 2025 compared with July 2024 are shown in Table Nine on page 23.
181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
22
Page 55 of 138
]EINFRASTRUCTURE
CONSULTING & ENGINEERING
TABLE NINE - INDIVIDUAL TRAFFIC MOVEMENTS DECLINING
FROM LOS E TO LOS F - JULY 2024 TO JULY 2025
AM/PM 2024 2025 Intersection Moveme nt Peak
Hour dpv LOS dpv
Northbound Left Turn AM 75.1 E 80.8 from Chamberlin Dr.
Wm. Hilton Pkwy. Northbound Through w/ Squire Pope Rd AM 75.5 E 80.9
/ Chamberlin Dr from Chamberlin Dr.
Southbound Left Turn AM 78.8 E 83.9 from Squire Pope Rd.
Wm. Hilton Pkwy. Northbound Left Turn
w/ Spanish Wells / from Spanish Wells AM 77.8 E 86.8
Wild Horse Rds. Rd.
Wm Hilton Pkwy. Eastbound Left Turn
w/ Beach City from Wm. Hilton PM 79.2 E 87.4
Rd./Gardner Dr. Pkwy.
Wm. Hilton Pkwy. Northbound Left Turn w/ Dillon from Plaza Dr. PM 78.5 E 80.3
Rd./Plaza Dr.
Wm. Hilton Pkwy. Southbound Left Turn PM 75.3 E 88.4 w/ Arrow Rd. from Arrow Rd.
Pope Ave. w/ New Westbound Left Turn
Orleans/Office from New Orleans PM 75.4 E 81.4
Park Rds. Rd.
Pope Ave. w/ Westbound Right
Turn from Gordillo PM 69.6 E 80.2 Cordillo Pkwy. Pkwv.
Sea Pines Circle Southbound Palmetto AM 49.2 E 68.7 Bay Road Approach
dpv - Average Total Delay per Vehicle in seconds
LOS
F
F
F
F
F
F
F
F
F
F
It should be noted that optimal and efficient peak hour traffic signal operation
that reduces the frequency of signal changes sufficiently to afford adequate capacity
to arterial through or other high-volume traffic movements routinely results in red
signals provided to low-volume , minor traffic movements that may approach or even
181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
23
Page 56 of 138
1
INFRASTRUCTURE
iCONSULTING & ENGINEERING
exceed two minutes. If the resulting average total delay per vehicle for any individual
traffic movements exceed 80.0 seconds at a signalized intersection, the movement is
evaluated as operating at LOS F. Hence, it may be very difficult and somewhat
impractical to operate traffic signals in a manner that avoids any traffic movements
operating at LOS F. The inclusion of this goal addressing individual traffic
movements in the LMO serves as a useful tool for identifying specific concerns
relating to development applications rather than to identify large numbers of
signalized intersections as being non-compliant based on low-demand traffic
movements that necessarily experience relatively long delays at traffic signals during
peak hours.
PART EIGHT - PLANNING COMMISSION ACTION
ON THIS REPORT AS OUTLINED IN THE LMO
As of the date of this report, the LMO requires that the Planning Commission
entertain and discuss this report at a public meeting that affords an opportunity for
public comment. No explicit action on the part of the Planning Commission is cited.
The LMO states that following the public meeting, the Planning Commission shall
forward the report to Town Council, accompanied by their own comments and remarks
on the report and its recommendations, if desired. The specific wording on action by
the Planning Commission in response to this report as outlined in Section 16-2-
103(J)10.c of the online LMO as of the date of this report is shown on the following
page for the Commission's ready reference.
PLANNING COMMISSION ACTION
''The Transportation Monitoring and Evaluation Report prepared by the Town Engineer as described
above shall be forwarded to the Planning Commission . Upon receipt of the Report and
recommendations from the Town Engineer, the Planning Commission shall give notice and hold a
public meeting for the purpose of discussing the Report and recommendations and eliciting public
comme nts."
"Following its review , the Planning Commission shall forward the Transp ortation Monitoring and
Evaluation Report and recommendations , and may forward its own supplementa l report and
recommendat ions , to the Town Council ."
181 Bluffton Road, Suite C-102 I Blufft on, SC 29910 I 843-485-3560 (P) I www.ice-eng.com
An Equal Opportunity Employer
24
Page 57 of 138
]EINFRASTRUCTURECONSULTING&ENGINEERING
APPENDIXA
JULY2025MORNINGANDAFTERNOONPEAK
HOURTURNINGMOVEMENTCOUNTSOF
SIGNALIZEDINTERSECTIONS
ANDSEAPINESCIRCLE
PageA-1
181BlufftonRoad,SuiteC-102]Bluffton,SC299101843-485-3560(P)]www.ice-eng.com
AnEqualOpportunityEmployer
Page 58 of 138
Signal Number 099
0 0 0 0 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
0
0
Ped Crosswalk
0 1310
0 0
Ped Crosswalk
19
2686
Bike Crosswalk
0 0
24 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
1036 Peak Hour
Factor 0.99
Bike(Road)
0 46 0 18 0
Page A-2
n/a2024 Total
Percent Change n/a
Crosstree Drive
On Island Off Island
Intersection Total
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
William Hilton Parkway - Crosstree Drive/C Heinrichs Circle
AM Peak Hour 7:15 AM to 8:15 AM
Westbound William Hilton Parkway
C Heinrichs Circle
0
2704
Eastbound William Hilton Parkway
1356
Tuesday July 8, 2025
0
2025 Total
1329
2710 4103
64
43
Page 59 of 138
Signal Number 099
0 2 0 2 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
2
0
Ped Crosswalk
0 2858
0 0
Ped Crosswalk
56
1871
Bike Crosswalk
0 3
24 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
1258 Peak Hour
Factor 0.97
Bike(Road)
0 40 0 29 0
Page A-3
2
80
2024 Total
Percent Change
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
4887
n/a
69
Intersection Total
2025 Total
Crosstree Drive
C Heinrichs Circle
William Hilton Parkway - Crosstree Drive/C Heinrichs Circle
4
2900
2919
1895
Eastbound William Hilton Parkway
On Island Off Island
Tuesday July 8, 2025
PM Peak Hour 4:45 PM to 5:45 PM
Westbound William Hilton Parkway
1905n/a
Page 60 of 138
Signal Number 100
0 203 0 43 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
42
0
Ped Crosswalk
0 1258
181 0
Ped Crosswalk
0
2493
Bike Crosswalk
0 0
1 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
1066 Peak Hour
Factor 0.99
Bike(Road)
0 2 0 1 0
Page A-4
William Hilton Parkway - Squire Pope Road/Chamberlin Drive
AM Peak Hour 7:30 AM to 8:30 AM
Westbound William Hilton Parkway
Squire Pope Road
223
2537
Eastbound William Hilton Parkway
1463
Tuesday July 8, 2025
1300
2675
On Island Off Island
Intersection Total
4224
246
2025 Total
3
1
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
43102024 Total
Percent Change -2.0%
Chamberlin Drive
Page 61 of 138
Signal Number 100
0 284 1 30 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
r
0 0
Bike (Road)
0
Bike Crosswalk
39
0
Ped Crosswalk
0 2516
175 0
Ped Crosswalk
0
1786
Bike Crosswalk
0 3
34 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
1250 Peak Hour
Factor 0.98
Bike(Road)
0 5 31 0 0
Page A-5
245
35
-2.8%
William Hilton Parkway - Squire Pope Road/Chamberlin Drive
315
2805
2558
1995
Eastbound William Hilton Parkway
On Island Off Island
Tuesday July 8, 2025
PM Peak Hour 4:00 PM to 5:00 PM
Westbound William Hilton Parkway
1819
2024 Total
Percent Change
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
4904
5047
36
Intersection Total
2025 Total
Chamberlin Drive
Squire Pope Road
Page 62 of 138
0 10 50 87 0 Signal Number 101
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 1
Bike (Road)
0
Bike Crosswalk
24
3
Ped Crosswalk
0 1065
53 0
Ped Crosswalk
56
2255
Bike Crosswalk
0 1
127 0
2
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
1010 Peak Hour
Factor 0.98
Bike(Road)
0 107 37 78 0
Page A-6
On Island Off Island
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
222
Spanish Wells Road
William Hilton Parkway - Wild Horse Road/Spanish Wells Road
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Wild Horse Road
114
2421
Eastbound William Hilton Parkway
1185
Tuesday July 8, 2025
147
1146
2440 3956
4243
Intersection Total
2025 Total
2024 Total
Percent Change -6.8%
233
Page 63 of 138
0 25 66 47 0 Signal Number 101
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
55
3
Ped Crosswalk
0 2201
58 0
Ped Crosswalk
19
1490
Bike Crosswalk
0 7
162 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
1171 Peak Hour
Factor 0.94
Bike(Road)
0 180 43 29 0
Page A-7
On Island Off Island
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Westbound William Hilton Parkway
1573Percent Change -6.6%
Spanish Wells Road
Wild Horse Road
William Hilton Parkway - Wild Horse Road/Spanish Wells Road
138
2409
2282
1713
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 5:00 PM to 6:00 PM
4385
4693
252
Intersection Total
2023 Total
2022 Total
156
247
Page 64 of 138
Signal Number 102
3 97 178 254 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
3 0
Bike (Road)
0
Bike Crosswalk
176
5
Ped Crosswalk
0 670
120 0
Ped Crosswalk
158
1357
Bike Crosswalk
0 1
27 3
0
Bike (Road) 0 2
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
863 Peak Hour
Factor 0.97
Bike(Road)
0 5 84 213 0
Page A-8
302
363
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
William Hilton Parkway - Gum Tree Road/Cross Island Parkway Ramps
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Gum Tree Road
380
1825
Eastbound William Hilton Parkway
777
Tuesday July 8, 2025
532
1005
1509 3356
Cross Island Parkway
On Island Off Island
3379
Intersection Total
2025 Total
2024 Total
Percent Change -0.7%
Page 65 of 138
Signal Number 102
0 119 123 228 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 1
Bike (Road)
0
Bike Crosswalk
447
0
Ped Crosswalk
0 1495
94 1
Ped Crosswalk
159
849
Bike Crosswalk
0 0
4 0
1
Bike (Road) 1 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
1131 Peak Hour
Factor 0.97
Bike(Road)
0 261 231 363 0
Page A-9
Percent Change 3.0%
Westbound William Hilton Parkway
1440
2024 Total
Cross Island Parkway
Gum Tree Road
772
286
William Hilton Parkway - Gum Tree Road/Cross Island Parkway Ramps
470
1875
2101
948
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
On Island Off Island
4377
4251
855
Intersection Total
2025 Total
Page 66 of 138
0 27 2 10 0 Signal Number 103
Bike(Road)
Bike Crosswalk Ped Crosswalk
4 2
Bike (Road)
1
Bike Crosswalk
11
5
Ped Crosswalk
0 953
42 0
Ped Crosswalk
8
1715
Bike Crosswalk
0 1
58 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
757 Peak Hour
Factor 0.95
Bike(Road)
0 19 0 7 0
Page A-10
26
68
William Hilton Parkway - Wilborn Road/Jarvis Park Road
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Wilborn Road
53
1733
Eastbound William Hilton Parkway
1004
Tuesday July 8, 2025
39
974
1820 2865
Jarvis Park Road
On Island Off Island
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
2956
Intersection Total
2025 Total
2024 Total
Percent Change -3.1%
Page 67 of 138
Signal Number 103
0 184 2 10 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
3 2
Bike (Road)
3
Bike Crosswalk
18
76
Ped Crosswalk
0 1837
59 0
Ped Crosswalk
1
1269
Bike Crosswalk
2 8
53 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
942 Peak Hour
Factor 0.95
Bike(Road)
0 63 2 3 0
Page A-11
Percent Change 0.7%
Westbound William Hilton Parkway
1290
2025 Total
2024 Total
Jarvis Park Road
Wilborn Road
79
56
William Hilton Parkway - Wilborn Road/Jarvis Park Road
196
2160
1867
1457
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
On Island Off Island
3595
3570
68
Intersection Total
Page 68 of 138
Signal Number 104
1 22 9 12 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
2 1
Bike (Road)
0
Bike Crosswalk
5
8
Ped Crosswalk
0 780
41 1
Ped Crosswalk
33
1460
Bike Crosswalk
0 2
173 2
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
723 Peak Hour
Factor 0.95
Bike(Road)
0 151 6 47 0
Page A-12
2894
Intersection Total
2025 Total
2024 Total
Percent Change -4.8%
215
William Hilton Parkway - Pembroke Drive/Museum Street
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Museum Street
52
1521
Eastbound William Hilton Parkway
961
Tuesday July 8, 2025
44
820
1682 2756
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
On Island Off Island
204
Pembroke Drive
Page 69 of 138
Signal Number 104
0 40 17 10 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
5 4
Bike (Road)
0
Bike Crosswalk
21
2
Ped Crosswalk
0 1519
49 0
Ped Crosswalk
33
1058
Bike Crosswalk
3 4
211 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
889 Peak Hour
Factor 0.96
Bike(Road)
0 387 16 42 0
Page A-13
3421
3430
445
Intersection Total
2025 Total
2024 Total
86
261
William Hilton Parkway - Pembroke Drive/Museum Street
67
1948
1577
1320
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 4:15 PM to 5:15 PM
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
On Island Off Island
Westbound William Hilton Parkway
1114Percent Change -0.3%
Pembroke Drive
Museum Street
Page 70 of 138
Signal Number 105
0 116 85 257 1
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
235
22
Ped Crosswalk
0 876
154 0
Ped Crosswalk
38
1163
Bike Crosswalk
0 7
50 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
846 Peak Hour
Factor 0.94
Bike(Road)
0 53 74 42 2
Page A-14
On Island Off Island
171
Indigo Run Drive
William Hilton Parkway - Whooping Crane Way/Indigo Run Drive
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Whooping Crane Way
464
1469
Eastbound William Hilton Parkway
1067
Tuesday July 8, 2025
459
1156
1389 3175
3058
Intersection Total
2025 Total
2024 Total
Percent Change 3.8%
173
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
Page 71 of 138
Signal Number 105
0 85 61 235 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
325
25
Ped Crosswalk
0 1376
125 0
Ped Crosswalk
23
967
Bike Crosswalk
0 2
42 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
968 Peak Hour
Factor 0.89
Bike(Road)
1 62 88 32 1
Page A-15
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
On Island Off Island
1236Percent Change -10.3%
Indigo Run Drive
Whooping Crane Way
538
127
William Hilton Parkway - Whooping Crane Way/Indigo Run Drive
381
1548
1726
1159
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 4:00 PM to 5:00 PM
3450
3845
184
Intersection Total
2025 Total
2024 Total
Westbound William Hilton Parkway
Page 72 of 138
Signal Number 106
0 208 25 62 0 113
Bike(Road)
Bike Crosswalk Ped Crosswalk
2 7
Bike (Road)
0
Bike Crosswalk
111
1
Ped Crosswalk
1 789
226 0
Ped Crosswalk
19
1196
Bike Crosswalk
1 0
9 0
0
Bike (Road) 0 1
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
751 Peak Hour
Factor 0.93
Bike(Road)
0 16 49 57 0
Page A-16
53
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
Gardner Drive
William Hilton Parkway - Beach City Road/Gardner Drive
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Beach City Road
386
1315
Eastbound William Hilton Parkway
1014
Tuesday July 8, 2025
295
27802025 Total
2024 Total
122
On Island Off Island
Intersection Total 919
1432
2963
Percent Change -6.2%
Page 73 of 138
Signal Number 106
0 357 42 75 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
8 0
Bike (Road)
0
Bike Crosswalk
54
1
Ped Crosswalk
1 1463
170 0
Ped Crosswalk
44
1052
Bike Crosswalk
0 2
16 0
0
Bike (Road) 0 1
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
893 Peak Hour
Factor 0.94
Bike(Road)
0 7 20 44 0
Page A-17
71
Intersection Total
3512
Gardner Drive
Beach City Road
244
102
William Hilton Parkway - Beach City Road/Gardner Drive
474
1828
1563
1239 3357
Tuesday July 8, 2025
PM Peak Hour 4:15 PM to 5:15 PM
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Eastbound William Hilton Parkway
Percent Change -4.4%
Westbound William Hilton Parkway
1173
2025 Total
2024 Total
On Island Off Island
Page 74 of 138
Signal Number 161
0 45 1123 99 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
38
0
Ped Crosswalk
5 29
48 0
Ped Crosswalk
61
28
Bike Crosswalk
2 0
57 0
0
Bike (Road) 11 3
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
645 Peak Hour
Factor 0.90
Bike(Road)
3 80 643 40 0
Page A-52
1244
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
766
Palmetto Bay Road
Palmetto Bay Road - Target Road/Island Crossings Shopping Center
AM Peak Hour 8:00 AM to 9:00 AM
Target Road
Palmetto Bay Road
729
167
Island Crossings Shopping Center
154
Tuesday July 8, 2025
1267
23152025 Total
2024 Total
Sea Pines Circle Off Island
Intersection Total 128
133
2380
Percent Change -2.7%
Page 75 of 138
Signal Number 161
0 51 964 37 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
1 0
Bike (Road)
0
Bike Crosswalk
105
0
Ped Crosswalk
2 57
145 0
Ped Crosswalk
59
43
Bike Crosswalk
0 0
97 0
0
Bike (Road) 4 4
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
772 Peak Hour
Factor 0.96
Bike(Road)
7 104 1262 24 0
Page A-53
2964
Off Island
Palmetto Bay Road
1512
Palmetto Bay Road - Target Road/Island Crossings Shopping Center
1052
212
221
285 2966
Tuesday July 8, 2025
PM Peak Hour 4:00 PM to 5:00 PM
Sea Pines Circle
Intersection Total
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Island Crossings Shopping Center
Percent Change 0.1%
Target Road
104
2025 Total
2024 Total
Palmetto Bay Road
1397
1127
Page 76 of 138
Signal Number 162
2 57 1159 225 1
Bike(Road)
Bike Crosswalk Ped Crosswalk
2 0
Bike (Road)
0
Bike Crosswalk
125
1
Ped Crosswalk
3 16
90 0
Ped Crosswalk
36
27
Bike Crosswalk
0 0
96 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
704 Peak Hour
Factor 0.91
Bike(Road)
1 33 642 39 0
Page A-54
Sea Pines Circle Off Island
Intersection Total 177
214
2711
Percent Change -5.8%
1444
25552025 Total
2024 Total
Palmetto Bay Road - Arrow Road/Point Comfort Road
AM Peak Hour 8:00 AM to 9:00 AM
Arrow Road
Palmetto Bay Road
858
291
Point Comfort Road
107
Tuesday July 8, 2025
1292
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
715
Palmetto Bay Road
Page 77 of 138
Signal Number 162
0 75 963 145 2
Bike(Road)
Bike Crosswalk Ped Crosswalk
4 2
Bike (Road)
0
Bike Crosswalk
313
0
Ped Crosswalk
2 34
71 0
Ped Crosswalk
42
28
Bike Crosswalk
0 0
68 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
876 Peak Hour
Factor 0.93
Bike(Road)
1 89 1369 65 0
Page A-55
1524
1074
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Point Comfort Road
Percent Change -1.6%
Arrow Road
238
2025 Total
2024 Total
Palmetto Bay Road
Tuesday July 8, 2025
PM Peak Hour 4:00 PM to 5:00 PM
Sea Pines Circle
Intersection Total
3327
Off Island
Palmetto Bay Road
1755
Palmetto Bay Road - Arrow Road/Point Comfort Road
1185
198
389
167 3273
Page 78 of 138
Signal Number 201
0 48 110 151 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
11 0
Bike (Road)
0
Bike Crosswalk
87
2
Ped Crosswalk
4 656
67 0
Ped Crosswalk
62
820
Bike Crosswalk
1 7
233 9
0
Bike (Road) 2 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
704 Peak Hour
Factor 0.92
Bike(Road)
0 141 82 93 0
Page A-18
Intersection Total
2025 Total
2024 Total
Percent Change 1.4%
405
Note: LMO States AM Peak Hour Will Be Between 7 AM -9 AM
2586
William Hilton Parkway - Mathews Drive (northern intersection)
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Mathews Drive
236
1071
Eastbound William Hilton Parkway
847
Tuesday July 8, 2025
309
812
1122
2550
On Island Off Island
316
Mathews Drive
Page 79 of 138
Signal Number 201
1 68 130 166 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
2 0
Bike (Road)
0
Bike Crosswalk
188
6
Ped Crosswalk
6 1162
44 2
Ped Crosswalk
81
761
Bike Crosswalk
1 1
275 7
0
Bike (Road) 2 2
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
881 Peak Hour
Factor 0.95
Bike(Road)
0 265 118 63 0
Page A-19
446
Intersection Total
2025 Total
2024 Total
Westbound William Hilton Parkway
991
William Hilton Parkway - Mathews Drive (northern intersection)
365
1501
1432
1086
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 4:15 PM to 5:15 PM
On Island Off Island
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Percent Change -3.5%
3351
3473
Mathews Drive
Mathews Drive
350
486
Page 80 of 138
Signal Number 202
0 152 29 72 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
15 2
Bike (Road)
0
Bike Crosswalk
59
4
Ped Crosswalk
1 642
137 5
Ped Crosswalk
66
902
Bike Crosswalk
0 0
72 1
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
644 Peak Hour
Factor 0.87
Bike(Road)
0 30 11 53 0
Page A-20
On Island Off Island
94
Plaza Drive
William Hilton Parkway - Dillon Road/Plaza Drive
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Dillon Road
207
1027
Eastbound William Hilton Parkway
828
Tuesday July 8, 2025
253
767
1115
2161
Intersection Total
2025 Total
2024 Total
Percent Change 4.3%
167
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
2253
Page 81 of 138
Signal Number 202
0 189 34 80 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
8 1
Bike (Road)
0
Bike Crosswalk
63
5
Ped Crosswalk
0 1232
152 2
Ped Crosswalk
102
764
Bike Crosswalk
0 1
74 1
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
752 Peak Hour
Factor 0.95
Bike(Road)
0 56 27 62 0
Page A-21
Off Island
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Percent Change -3.6%
2853
2959
Plaza Drive
Dillon Road
242
210
William Hilton Parkway - Dillon Road/Plaza Drive
303
1482
1398
995
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 4:15 PM to 5:15 PM
On Island
145
Intersection Total
2025 Total
2024 Total
Westbound William Hilton Parkway
907
Page 82 of 138
Signal Number 203
3 137 64 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
52
0
Ped Crosswalk
0 611
197 0
Ped Crosswalk
837
Bike Crosswalk
0 0
0
0
Bike (Road)
Highest
15 Min.
Volume
535 Peak Hour
Factor 0.89
Page A-22
On Island Off Island
William Hilton Parkway - Coggins Point Road
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Coggins Point Road
52
837
Eastbound William Hilton Parkway
748
Tuesday July 8, 2025
204
663
1034
1831
Intersection Total
2025 Total
2024 Total
Percent Change 3.8%
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
1901
Page 83 of 138
Signal Number 203
4 233 87 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
80
1
Ped Crosswalk
0 1186
187 0
Ped Crosswalk
756
Bike Crosswalk
0 0
0
0
Bike (Road)
Highest
15 Min.
Volume
671 Peak Hour
Factor 0.94
Page A-23
On Island Off Island
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Percent Change -2.7%
2534
2603
Coggins Point Road
80
William Hilton Parkway - Coggins Point Road
324
1420
1266
944
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 4:15 PM to 5:15 PM
Intersection Total
2025 Total
2024 Total
Westbound William Hilton Parkway
756
Page 84 of 138
Signal Number 204
3 4 0 4 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
16 8
Bike (Road)
0
Bike Crosswalk
3
2
Ped Crosswalk
0 647
6 0
Ped Crosswalk
2
864
Bike Crosswalk
0 0
35 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
443 Peak Hour
Factor 0.91
Bike(Road)
0 10 0 3 0
Page A-24
On Island Off Island
13
Beachwood Drive
William Hilton Parkway - Beachwood Drive
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Beachwood Drive
9
871
Eastbound William Hilton Parkway
663
Tuesday July 8, 2025
11
652
907
1621
Intersection Total
2025 Total
2024 Total
Percent Change -0.9%
37
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
1607
Page 85 of 138
Signal Number 204
0 8 0 4 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
15 0
d Bike (Road)
0
Bike Crosswalk
5
4
Ped Crosswalk
0 1212
2 0
Ped Crosswalk
3
824
Bike Crosswalk
0 0
11 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
550 Peak Hour
Factor 0.96
Bike(Road)
0 20 0 4 0
Page A-25
Off Island
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Percent Change -5.2%
2112
2229
Beachwood Drive
Beachwood Drive
7
14
William Hilton Parkway - Beachwood Drive
12
1244
1220
841
Eastbound William Hilton Parkway
Tuesday July 8, 2025
PM Peak Hour 4:15 PM to 5:15 PM
On Island
24
Intersection Total
2025 Total
2024 Total
Westbound William Hilton Parkway
832
Page 86 of 138
Signal Number 205
3 40 48 95 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
3 23
Bike (Road)
0
Bike Crosswalk
60
0
Ped Crosswalk
12 548
56 4
Ped Crosswalk
156
791
Bike Crosswalk
2 1
27 2
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
685 Peak Hour
Factor 0.87
Bike(Road)
0 29 61 410 0
Page A-26
On Island Off Island
Intersection Total 765
874
2413
Percent Change -1.7%
William Hilton Parkway - Folly Field Road / Mathews Drive
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Folly Field Road
177
1297
Eastbound William Hilton Parkway
617
Tuesday July 8, 2025
186
23712025 Total
2024 Total
Mathews Drive
231
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
500
Page 87 of 138
Signal Number 205
0 91 57 167 0 148
Bike(Road)
Bike Crosswalk Ped Crosswalk
7 5
Bike (Road)
1
Bike Crosswalk
111
0
Ped Crosswalk
12 1106
86 0
Ped Crosswalk
307
707
Bike Crosswalk
0 0
45 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
825 Peak Hour
Factor 0.95
Bike(Road)
0 17 70 355 0
Page A-27
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Eastbound William Hilton Parkway
Percent Change -5.1%
Westbound William Hilton Parkway
1229
2025 Total
2024 Total
Mathews Drive
Folly Field Road
267
409
William Hilton Parkway - Folly Field Road / Mathews Drive
315
1214
1525
838 3144
Tuesday July 8, 2025
PM Peak Hour 4:15 PM to 5:15 PM
On Island
442
Intersection Total
3314
Off Island
Page 88 of 138
Signal Number 206
0 26 30 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
39 17
Bike (Road)
1
Bike Crosswalk
7
0
Ped Crosswalk
0 712
31 2
Ped Crosswalk
1181
Bike Crosswalk
0 0
2
0
Bike (Road)
Highest
15 Min.
Volume
582 Peak Hour
Factor 0.88
Page A-28
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
William Hilton Parkway - Singleton Beach Road
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Singleton Beach Road
9
1181
Eastbound William Hilton Parkway
738
Tuesday July 8, 2025
56
20482025 Total
2024 Total
On Island Off Island
Intersection Total 720
1212
2016
Percent Change 1.6%
Page 89 of 138
Signal Number 206
0 33 33 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
51 2
Bike (Road)
0
Bike Crosswalk
24
1
Ped Crosswalk
0 1407
23 0
Ped Crosswalk
1228
Bike Crosswalk
0 0
3
0
Bike (Road)
Highest
15 Min.
Volume
721 Peak Hour
Factor 0.97
Page A-29
2863
On Island
Singleton Beach Road
24
William Hilton Parkway - Singleton Beach Road
66
1441
1431
1252 2805
Tuesday July 8, 2025
PM Peak Hour 4:00 PM to 5:00 PM
Off Island
Intersection Total
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Eastbound William Hilton Parkway
Percent Change -2.0%
Westbound William Hilton Parkway
1228
2025 Total
2024 Total
Page 90 of 138
Signal Number 243
23 123
Bike Crosswalk Ped Crosswalk
Bike (Road)
2
183
186
0
Bike (Road)
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
180 Peak Hour
Factor 0.83
Bike(Road)
55 28 0
Page A-50
146
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
83
Beach Side
South Forest Beach Drive - Coligny Beach Park Pedestrian Crossing
AM Peak Hour 8:00 AM to 9:00 AM
South Forest Beach Drive
Parking Lot Side
83
309
South Forest Beach Drive
238
Tuesday July 8, 2025
146
6002025 Total
2024 Total
Sea Pines Ocean Gate Coligny Circle
Intersection Total 185
186
645
Percent Change -7.0%
Page 91 of 138
Signal Number 243
41 168
Bike Crosswalk Ped Crosswalk
Bike (Road)
0
254
381
0
Bike (Road)
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
316 Peak Hour
Factor 0.89
Bike(Road)
248 27 0
Page A-51
1107
Coligny Circle
Parking Lot Side
275
South Forest Beach Drive - Coligny Beach Park Pedestrian Crossing
209
502
254
381 1119
Tuesday July 8, 2025
PM Peak Hour 4:45 PM to 5:45 PM
Sea Pines Ocean Gate
Intersection Total
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
South Forest Beach Drive Percent Change 1.1%
South Forest Beach Drive
549
2025 Total
2024 Total
Beach Side
275
209
Page 92 of 138
Signal Number 300
Bike (Road)
0
Bike Crosswalk
0
Ped Crosswalk
6 681
0
Ped Crosswalk
6
1167
Bike Crosswalk
2 0
54 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
561 Peak Hour
Factor 0.87
Bike(Road)
0 37 5 0
Page A-30
1958
42
60
William Hilton Parkway - Shelter Cove Lane (off-island intersection near BCSO)
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
1172
Eastbound William Hilton Parkway
718
Tuesday July 8, 2025
2025 Total
687
1221
On Island Off Island
Intersection Total
19402024 Total
Percent Change 0.9%
Shelter Cove Lane
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
Page 93 of 138
Signal Number 300
Bike (Road)
0
Bike Crosswalk
0
Ped Crosswalk
5 1356
0
Ped Crosswalk
8
1212
Bike Crosswalk
2 0
56 0
0
Bike (Road) 1 4
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
700 Peak Hour
Factor 0.97
Bike(Road)
0 74 3 0
Page A-31
William Hilton Parkway - Shelter Cove Lane (off-island intersection near BCSO)
1430
1364
1268
Eastbound William Hilton Parkway
On Island Off Island
Tuesday July 8, 2025
PM Peak Hour 4:00 PM to 5:00 PM
Westbound William Hilton Parkway
1215
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
2721
2776
77
Intersection Total
2025 Total
Shelter Cove Lane
-2.0%
64
2024 Total
Percent Change
Page 94 of 138
Signal Number 301
Bike (Road)
1
Bike Crosswalk
0
Ped Crosswalk
0 641
0
Ped Crosswalk
59
1036
Bike Crosswalk
0 1
109 0
0
Bike (Road) 0 1
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
546 Peak Hour
Factor 0.91
Bike(Road)
0 74 56 0
Page A-32
1978
130
168
William Hilton Parkway - Shelter Cove Lane (central intersection near Hilton Head Tavern)
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
1093
Eastbound William Hilton Parkway
715
Tuesday July 8, 2025
2025 Total
702
1145
On Island Off Island
Intersection Total
19522024 Total
Percent Change 1.3%
Shelter Cove Lane
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
Page 95 of 138
Signal Number 301
Bike (Road)
0
Bike Crosswalk
0
Ped Crosswalk
3 1173
0
Ped Crosswalk
131
984
Bike Crosswalk
0 8
175 0
0
Bike (Road) 0 8
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
734 Peak Hour
Factor 0.96
Bike(Road)
0 208 141 0
Page A-33
William Hilton Parkway - Shelter Cove Lane (central intersection near Hilton Head Tavern)
1381
1312
1159
Eastbound William Hilton Parkway
On Island Off Island
Tuesday July 8, 2025
PM Peak Hour 4:15 PM to 5:15 PM
Westbound William Hilton Parkway
1133
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
2831
2936
349
Intersection Total
2025 Total
Shelter Cove Lane
-3.6%
306
2024 Total
Percent Change
Page 96 of 138
Signal Number 302
23 217 20 156 1
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
169
26
Ped Crosswalk
0 503
199 0
Ped Crosswalk
19
775
Bike Crosswalk
0 7
62 2
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
662 Peak Hour
Factor 0.86
Bike(Road)
0 37 25 24 0
Page A-34
101
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
86
King Neptune Way
William Hilton Parkway - Queens Folly Road/King Neptune Way
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Queens Folly Road
394
962
Eastbound William Hilton Parkway
783
Tuesday July 8, 2025
417
22652025 Total
2024 Total
On Island Off Island
Intersection Total 698
1062
2307
Percent Change -1.8%
Page 97 of 138
Signal Number 302
28 338 66 234 1 148
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
160
16
Ped Crosswalk
0 911
226 0
Ped Crosswalk
61
890
Bike Crosswalk
0 1
105 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
843 Peak Hour
Factor 0.96
Bike(Road)
1 101 41 60 0
Page A-35
3407
Off Island
Queens Folly Road
428
William Hilton Parkway - Queens Folly Road/King Neptune Way
667
1366
1133
1237 3240
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
On Island
Intersection Total
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Eastbound William Hilton Parkway
Percent Change -4.9%
Westbound William Hilton Parkway
1185
2025 Total
2024 Total
King Neptune Way
203
233
Page 98 of 138
Signal Number 303
0 29 0 19 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
12 13
Bike (Road)
1
Bike Crosswalk
10
7
Ped Crosswalk
2 635
17 0
Ped Crosswalk
20
889
Bike Crosswalk
1 5
15 0
0
Bike (Road) 1 6
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
504 Peak Hour
Factor 0.84
Bike(Road)
0 9 0 3 0
Page A-36
On Island Off Island
Intersection Total 671
928
1711
Percent Change -1.0%
William Hilton Parkway - Queens Way
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Queens Way
27
916
Eastbound William Hilton Parkway
680
Tuesday July 8, 2025
48
16942025 Total
2024 Total
35
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
12
Queens Way
Page 99 of 138
Signal Number 303
0 13 0 12 0 148
Bike(Road)
Bike Crosswalk Ped Crosswalk
18 0
Bike (Road)
0
Bike Crosswalk
14
6
Ped Crosswalk
2 1022
29 0
Ped Crosswalk
9
1039
Bike Crosswalk
0 4
14 0
0
Bike (Road) 2 18
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
618 Peak Hour
Factor 0.90
Bike(Road)
0 30 3 1 0
Page A-37
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Eastbound William Hilton Parkway
Percent Change -11.2%
Westbound William Hilton Parkway
1056
2025 Total
2024 Total
Queens Way
34
23
William Hilton Parkway - Queens Way
25
1071
1049
1088 2236
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
On Island
Intersection Total
2517
Off Island
Queens Way
46
Page 100 of 138
Signal Number 401
0 88 19 84 1 148
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
62
0
Ped Crosswalk
0 1010
69 0
Ped Crosswalk
15
1027
Bike Crosswalk
0 0
147 1
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
711 Peak Hour
Factor 0.93
Bike(Road)
0 96 15 23 0
Page A-39
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Eastbound William Hilton Parkway
Percent Change -5.2%
Westbound William Hilton Parkway
1134
2025 Total
2024 Total
Wexford Drive
134
181
William Hilton Parkway - Shipyard Drive/Wexford Drive
192
1194
1087
1243 2657
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
On Island
Intersection Total
2802
Off Island
Shipyard Drive
147
Page 101 of 138
Signal Number 402
0 95 3 3 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
8 6
Bike (Road)
0
Bike Crosswalk
15
0
Ped Crosswalk
5 537
129 0
Ped Crosswalk
11
696
Bike Crosswalk
0 4
16 1
1
Bike (Road) 0 3
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
445 Peak Hour
Factor 0.87
Bike(Road)
0 8 5 9 0
Page A-40
On Island Off Island
Intersection Total 567
842
1687
Percent Change -7.8%
William Hilton Parkway - New Orleans Road/Village at Wexford
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
New Orleans Road
149
712
Eastbound William Hilton Parkway
640
Tuesday July 8, 2025
101
15552025 Total
2024 Total
30
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
22
Village at Wexford
Page 102 of 138
Signal Number 402
0 324 11 16 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
16 1
Bike (Road)
0
Bike Crosswalk
22
1
Ped Crosswalk
5 723
235 0
Ped Crosswalk
16
845
Bike Crosswalk
0 6
47 0
0
Bike (Road) 0 5
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
630 Peak Hour
Factor 0.92
Bike(Road)
0 19 7 23 0
Page B-41
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Eastbound William Hilton Parkway
Percent Change -8.7%
Westbound William Hilton Parkway
890
2025 Total
2024 Total
Village at Wexford
49
74
William Hilton Parkway - New Orleans Road/Village at Wexford
351
1067
767
1128 2322
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
On Island
Intersection Total
2542
Off Island
New Orleans Road
264
Page 103 of 138
Signal Number 403
3 18 37 23 1
Bike(Road)
Bike Crosswalk Ped Crosswalk
8 2
Bike (Road)
0
Bike Crosswalk
33
0
Ped Crosswalk
3 434
52 1
Ped Crosswalk
40
547
Bike Crosswalk
3 0
121 4
1
Bike (Road) 0 1
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
471 Peak Hour
Factor 0.84
Bike(Road)
0 140 85 23 3
Page A-42
198
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
251
Arrow Road
William Hilton Parkway - Arrow Road
AM Peak Hour 8:00 AM to 9:00 AM
Westbound William Hilton Parkway
Arrow Road
171
593
Eastbound William Hilton Parkway
592
Tuesday July 8, 2025
82
15832025 Total
2024 Total
On Island Off Island
Intersection Total 507
721
1598
Percent Change -0.9%
Page 104 of 138
Signal Number 403
1 55 144 88 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
14 1
Bike (Road)
0
Bike Crosswalk
24
0
Ped Crosswalk
8 562
85 0
Ped Crosswalk
78
611
Bike Crosswalk
0 3
173 3
0
Bike (Road) 0 1
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
558 Peak Hour
Factor 0.94
Bike(Road)
0 148 64 24 0
Page A-43
2319
Off Island
Arrow Road
173
William Hilton Parkway - Arrow Road
288
765
667
869 2087
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
On Island
Intersection Total
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Eastbound William Hilton Parkway
Percent Change -10.0%
Westbound William Hilton Parkway
726
2025 Total
2024 Total
Arrow Road
236
395
Page 105 of 138
Signal Number 501
0 13 728 41 5
Bike(Road)
Bike Crosswalk Ped Crosswalk
8 1
Bike (Road)
3
Bike Crosswalk
28
0
Ped Crosswalk
8 24
12 8
Ped Crosswalk
131
21
Bike Crosswalk
3 0
69 12
0
Bike (Road) 2 12
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
606 Peak Hour
Factor 0.77
Bike(Road)
2 54 547 129 2
Page A-44
Coligny Circle Sea Pines Circle
Intersection Total 186
102
2012
Percent Change -7.4%
Pope Avenue - New Orleans Road/Office Park Road
AM Peak Hour 8:00 AM to 9:00 AM
New Orleans Road
Pope Avenue
592
191
Office Park Road
91
Tuesday July 8, 2025
787
18632025 Total
2024 Total
930
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
734
Pope Avenue
Page 106 of 138
Signal Number 501
0 16 705 66 38
Bike(Road)
Bike Crosswalk Ped Crosswalk
6 0
Bike (Road)
0
Bike Crosswalk
43
3
Ped Crosswalk
11 65
60 3
Ped Crosswalk
231
103
Bike Crosswalk
0 0
140 24
0
Bike (Road) 2 11
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
760 Peak Hour
Factor 0.95
Bike(Road)
0 111 896 360 0
Page A-45
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Office Park Road
Percent Change -6.6%
New Orleans Road
529
2025 Total
2024 Total
Pope Avenue
1367
1076
Pope Avenue - New Orleans Road/Office Park Road
825
195
339
306 2894
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
Coligny Circle
Intersection Total
3099
Sea Pines Circle
Pope Avenue
1037
Page 107 of 138
Signal Number 502
0 353 451 36 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
24 3
Bike (Road)
0
Bike Crosswalk
39
0
Ped Crosswalk
40 13
282 27
Ped Crosswalk
28
11
Bike Crosswalk
11 0
14 30
1
Bike (Road) 5 1
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
540 Peak Hour
Factor 0.81
Bike(Road)
1 14 349 27 0
Page A-46
Coligny Circle Sea Pines Circle
Intersection Total 80
308
1784
Percent Change -1.3%
Pope Avenue - Cordillo Parkway
AM Peak Hour 8:00 AM to 9:00 AM
Cordillo Parkway
Pope Avenue
670
74
Cordillo Parkway
380
Tuesday July 8, 2025
840
17602025 Total
2024 Total
494
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
391
Pope Avenue
Page 108 of 138
Signal Number 502
0 308 613 49 3
Bike(Road)
Bike Crosswalk Ped Crosswalk
24 4
Bike (Road)
0
Bike Crosswalk
67
0
Ped Crosswalk
33 17
377 4
Ped Crosswalk
41
14
Bike Crosswalk
13 0
26 18
0
Bike (Road) 0 2
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
665 Peak Hour
Factor 0.95
Bike(Road)
6 29 835 34 0
Page A-47
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Cordillo Parkway
Percent Change -2.3%
Cordillo Parkway
97
2025 Total
2024 Total
Pope Avenue
904
686
Pope Avenue - Cordillo Parkway
973
354
125
417 2517
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
Coligny Circle
Intersection Total
2577
Sea Pines Circle
Pope Avenue
1282
Page 109 of 138
Signal Number 503
2 32 278 86 8
Bike(Road)
Bike Crosswalk Ped Crosswalk
28 33
Bike (Road)
1
Bike Crosswalk
59
0
Ped Crosswalk
43 3
14 48
Ped Crosswalk
11
2
Bike Crosswalk
70 0
7 49
1
Bike (Road) 5 17
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
339 Peak Hour
Factor 0.79
Bike(Road)
2 6 256 10 1
Page A-47
298
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
275
Pope Avenue
Pope Avenue - Lagoon Road/Beach Parking Lot
AM Peak Hour 8:00 AM to 9:00 AM
Lagoon Road
Pope Avenue
337
98
Beach Parking Lot
41
Tuesday July 8, 2025
406
10722025 Total
2024 Total
Coligny Circle Sea Pines Circle
Intersection Total 74
24
1017
Percent Change 5.4%
Page 110 of 138
Signal Number 503
0 54 337 191 1
Bike(Road)
Bike Crosswalk Ped Crosswalk
27 10
Bike (Road)
0
Bike Crosswalk
168
0
Ped Crosswalk
61 6
59 12
Ped Crosswalk
25
5
Bike Crosswalk
21 0
15 30
0
Bike (Road) 32 3
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
446 Peak Hour
Factor 0.93
Bike(Road)
2 7 572 20 0
Page A-48
1736
Sea Pines Circle
Pope Avenue
800
379
Pope Avenue - Lagoon Road / Beach Parking Lot
583
67
199
79 1658
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
Coligny Circle
Intersection Total
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Beach Parking Lot
Percent Change -4.5%
Lagoon Road
216
2025 Total
2024 Total
Pope Avenue
601
Page 111 of 138
0 40 1078 89 0
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
0
Bike Crosswalk
28
0
Ped Crosswalk
4 0
0 0
Ped Crosswalk
11
0
Bike Crosswalk
3 0
19 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
538 Peak Hour
Factor 0.92
Bike(Road)
0 7 689 13 0
Page A-59
Sea Pines Circle Off Island
Intersection Total 39
19
n/a
Percent Change n/a
1207
19812025 Total
2024 Total
Palmetto Bay Road - Dunnagans Alley/Enmark Driveway
AM Peak Hour 8:00 AM to 9:00 AM
Dunnagans Alley
Palmetto Bay Road
717
102
Enmark Driveway
47
Wednesday July 9, 2025
1108
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
709
Palmetto Bay Road
Page 112 of 138
0 18 1093 62 1
Bike(Road)
Bike Crosswalk Ped Crosswalk
0 0
Bike (Road)
1
Bike Crosswalk
133
0
Ped Crosswalk
0 0
2 0
Ped Crosswalk
22
2
Bike Crosswalk
0 0
18 0
0
Bike (Road) 0 0
Ped Crosswalk Bike Crosswalk
Highest
15 Min.
Volume
666 Peak Hour
Factor 0.99
Bike(Road)
0 9 1251 13 0
Page A-60
1273
1133
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
Enmark Driveway
Percent Change n/a
Dunnagans Alley
77
2025 Total
2024 Total
Palmetto Bay Road
Wednesday July 9, 2025
PM Peak Hour 4:00 PM to 5:00 PM
Sea Pines Circle
Intersection Total
n/a
Off Island
Palmetto Bay Road
1387
Palmetto Bay Road - Dunnagans Alley/Enmark Driveway
1174
27
156
22 2625
Page 113 of 138
0 456 524 195 0
Bike(Road)
Bike (Road)
0
158
0 228
279 205
157 0
80
0
Bike (Road)
Highest
15 Min.
Volume
834 Peak Hour
Factor 0.86
Bike(Road)
6 51 337 195 1
Page A-56
Intersection Total 591
516
2892
Percent Change -0.7%
1175
28722025 Total
2024 Total
Sea Pines Circle
AM Peak Hour 8:00 AM to 9:00 AM
William Hilton Parkway
Palmetto Bay Road
774
547
Greenwood Drive
735
Tuesday July 8, 2025
815
Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM
590
Pope Avenue
Page 114 of 138
0 457 461 205 0
Bike(Road)
Bike (Road)
0
280
0 251
284 267
160 1
148
0
Bike (Road)
Highest
15 Min.
Volume
888 Peak Hour
Factor 0.97
Bike(Road)
8 77 495 351 0
Page A-57
931
884
Note: LMO Does Not Cite Midday Peak Hour. It is included for information.
Greenwood Drive
Percent Change -2.0%
William Hilton Parkway
717
2025 Total
2024 Total
Pope Avenue
Tuesday July 8, 2025
Midday Peak Hour 11:30 AM to 12:30 PM
Intersection Total
3515
Palmetto Bay Road
1059
Sea Pines Circle
1123
785
799
592 3445
Page 115 of 138
0 426 496 200 0
Bike(Road)
Bike (Road)
0
330
0 214
364 186
133 0
123
0
Bike (Road)
Highest
15 Min.
Volume
899 Peak Hour
Factor 0.98
Bike(Road)
5 67 624 346 0
Page A-58
Intersection Total 730
620
3668
Percent Change -4.2%
1122
35142025 Total
2024 Total
Sea Pines Circle
PM Peak Hour 4:00 PM to 5:00 PM
William Hilton Parkway
Palmetto Bay Road
1318
679
Greenwood Drive
707
Tuesday July 8, 2025
810
Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM
1042
Pope Avenue
Page 116 of 138
lan
Ir
• • • • • • 0 •
• • • .. -'@ e •
0 - • •
• • ¢ -e e • @,'@
Page 117 of 138
Codified Requirements for This Report
Summary of weekday morning and
afternoon peak hour turning
movement counts for each
signalized intersection within the
Town
Morning, midday, and afternoon
peak hour turning movement
counts for Sea Pines Circle in
calendar years that are multiples of
five
Summary of 24-hour bi-directional
demand on the Town’s major
arterial network
Historical trends relative to the
previous 5-year period
Description of operating conditions
at each signalized intersection
relative to the dual LMO-described
operational goals
Recommendations to successfully
mitigate any identified deficiencies
in operations relative to the LMO
goals
(
Page 118 of 138
William Hilton Parkway - Shipyard Drive/Wexford Drive
Tuesday July 8, 2025
PM Peak Hour 4:30 PM to 5:30 PM
:: ·
Shipyard Drive
192
0 88 19 84 1 148
¢ 1
J I • ls 1I
¢ t 147
hoar rowait ee oegai
0 0
es> 0 >r q r3 1194
¢ 3
±
-. 62 ±• •a tie wait aC
.::, t 0 C
£ 0 Intersection Total - 1010 £he oepai
£ 1087 rE 69 I 0 t r- 15 E
g 2025 Total 2657 lee gait .g
1243
3 1027 p t 0
C. 0 3
U bier oottair 2024 Total 2802 .,,
C C
3 1 3
2 147 y Percent Change -5.2% 3t t1134 - 0/ ~r¢
#f 3ul 0 0 0
181 t ¢eeonwai baa oera
I n ., 1 r 4 3
i0 96 15 23 0
134
Wexford Drive
Note: LMO States PM Peak Hour Will Be Between 4 PM-6 PM
•
•••
Page 119 of 138
Table One – Average
Bi-Directional 24-Hour
Demand July 2025
• Page 9
TABLE ONE
24-HOUR BI-DIRECTIONAL TRAFFIC DEMAND - JUNE 2020-2022°
JULY 2023-2025°
Map 5-year
Ref. Location 2020 2021 2022 2023 2024 2025 %change/yr,
1)m. Hilton Pkwy. at J. Wilton Graves Br. 58.973 63,304 61,628 63,434 63,861 62,444 +1.2
2) Wm. Hilton Pkwy. west of Cross Is. Pkwy. 49,660 56,270 56,492 57,287 59,513 57,475 +3.0
3)Wm. Hilton Pkwy. east ot Whooping Crane 42,120 46,901 41,679 40,913 43,321 40,878 -0.6
MLWm. Hilton Pkwy. east of Coggins Pt. Rd. 30,655 34,758 29,282 28,146 29,260 27,713 -2.0
5)m. Hilton Pkwy. west of Queens Folly Rd 39,361 43,806 36,678 37,202 36,886 35,263 -2.2
6) Wm. Hilton Pkwy. west of Arrow Road 26,347 29,682 26,310 26,336 26,131 24,020 -1.8
7) Pope Avenue south of New Orleans Rd. 31,709 34,156 32,569 34,514 33,373 32,102 +0.2
8) Palmetto Bay Rd. south ot Pt. Comfort Rd. 26,029 27,661 32,634 34,564 34,060 32,785 +4.7
9) Cross Island Pkwy. south of W. Hilton Pkwy. 16,593 17,734 20,905 22,326 22,910 22,022 +5.8
10) Cross-Island Pkwy. at Chas. Fraser Bridge 26,421 29,256 34,990 37,881 37,362 36,526 +6.7
TOTAL OF ALL TEN STATIONS 347,868 383,523 373,167 392,603 386,677 371,228 +1.3
Composite Rate of Change - 2024-2025=
Composite Rate of Change- 2023-2024=
Effective Composite Annual Rate of Change - 2020-2025 =
+1.1%."
+1.3%¢
The Town began taking its annual traffic counts in July instead of June in 2023 due to a Land Management
Ordinance (LMO) revision.
II three rates based exclusively on the data presented in Table One
Page 120 of 138
Shift in Traffic Demand
From William Hilton
Parkway to the Cross-
Island Parkway.
Following End of Toll
Collection on Cross-
Island Parkway
June 2021 - Toll Still Being Collected
Wm. Hilton Pkwy. - 68.5%
Cross-Island Pkwy. - 31.5%
July 2025 – 4 Yrs. Following
End of Toll Collections
Wm. Hilton Pkwy. - 62%
Cross-Island Pkwy. - 38%*
• Page 9
Page 121 of 138
TABLE TWO
SCDOT 24-HOUR AVERAGE BI-DIRECTIONAL DEMAND ON JENKINS ISLAND
2015 – 2025 (CALENDAR YEAR AVERAGE – AADT)
YEAR AADT
% CHANGE 2024 – 2025: - 0.5%
% CHANGE 2023 – 2024: - 4.1%
AVG. ANNUAL RATE OF CHANGE 2020 – 2025: +2.0%
AVG. ANNUAL RATE OF CHANGE 2015 – 2025: +0.4%
2015 54700
2020 51400
2021 57400
2022 57400
2023 57900
2024 57100
2025 56800
• Page 10
a (@fa
/»-@} ' • ••I
•
I - 0G
I
-
• - - • • - •
Page 122 of 138
Table Three –
Signalized
Intersection Demand
2025 vs. 2024
• Page - 11
TABLE THREE
PEAK HOUR SIGNALIZED INTERSECTION VOLUME - JULY 2024-2025
AM PM
2025 Vol. 2024 Vol. %Chg. 2025 Vol. 2024 Vol. %Chg.
William Hilton Pkwy./ Crosstree Drive 4103 4887
William Hilton Pkwy./ Squire Pope Rd. 4224 4310 -2.0 4904 5047 -2.8
William Hilton Pkwy./ Spanish Wells Rd. 3955 4243 -6.8 4385 4693 -6.6
William Hilton Pkwy./ Gumtree Rd. 3356 3379 -0.7 4377 4251 +3.0
William Hilton Pkwy./ Wilborn Rd. 2865 2956 -3.1 3595 3570 +0.7
William Hilton Pkwy./ Pembroke Dr. 2756 2894 4.8 3421 3430 -0.3
William Hilton Pkwy./ Whooping Crane Way 3175 3058 +3.8 3450 3845 -10.3
William Hilton Pkwy./ Beach City Rd. 2780 2963 -6.2 3357 3512 -4.4
William Hilton Pkwy./ Mathews Dr. (north) 2577 2550 +1.1 3351 3473 -3.5
William Hilton Pkwy./ Dillon Rd. 2253 2161 +4.3 2853 2959 -3.6
William Hilton Pkwy./ Coggins Point Rd. 1901 1831 +3.8 2534 2603 -2.7
William Hilton Pkwy./ Beachwood Dr. 1507 1621 -7.0 2112 2229 -5.2
William Hilton Pkwy./ Mathews/ Folly Field 2371 2413 -1.7 3144 3314 -7.1
William Hilton Pkwy./ Singleton Beach Rd. 2048 2016 +1.6 2805 2863 -2.0
William Hilton Pkwy./ Sh. Cove Ln. (off-is.) 1958 1940 +0.9 2721 2776 -2.0
William Hilton Pkwy. I Sh. Cove Ln. (central) 1977 1952 +1.3 2831 2936 -3.6
William Hilton Pkwy./ Queens Folly Rd. 2265 2304 -1.8 3240 3407 -4.9
William Hilton Pkwy./ Queens Way 1694 1711 -1.0 2236 2517 -11.2
William Hilton Pkwy./ Shipyard/ Wexford 1830 1843 -0.7 2657 2802 -5.2
William Hilton Pkwy./ New Orleans Rd. 1555 1687 -7.8 2322 2542 -8.7
William Hilton Pkwy./ Arrow Rd. 1583 1598 -0.9 2087 2319 -10.0
Pope Ave./ New Orleans/ Office Park 1863 2012 -7.4 2894 3099 -6.6
Pope Ave. 1 Cordill Pkwy. 1760 1784 -1.3 2517 2577 -2.3
Pope Ave./ Lagoon Road 1072 1017 +5.4 1658 1736 4.5
South Forest Beach Drive Pedestrian Signal 600 645 -7.0 1119 1107 +1.1
Palmetto Bay Rd./ Target Rd. 2315 2380 -2.7 2964 2964 0.0Palmetto Bay Rd./ Arrow/ Point Comfort 2555 2711 -5.8 3273 3327 a.aSea Pines Circle 2872 2892 -0.7 3514 3668 4.2
TOTAL' 61667 62871 -1.9 80321 83566 -3.9/
2025 Vol. 2024 Vol. %Chg.
Sea Pines Circle Midday Peak Hour 3445 3515 -2.0%
Total does not include the intersection of Wm. Hilton Pky/Crosstree Drive due to no comparable 2024 counts being
taken at this location.
Page 123 of 138
• Page - 12
• .. •e TABLE FOUR
- .. •
)r@.Y@ .. I .. OFF-STREET' FOUR-HOUR PEDESTRIAN/ BICYCLE CROSSING DEMAND AT• ¢ e e • e SIGNALIZED INTERSEC IONS_- JUNE_JULY 2020-2025
• ,g .. .. •- July lub June 5-yr.% Chg.
2025 2024 2020 2020-2025
Wiliam Hilton Pkwy. / Crosstree Drive 0 NOT COUNTED
William Hilton Pkwy. / Squire Pope Rd 3 1 0
Wiliam Hilton Pkwy. / Spanish Wells Rd. 5 22 12 -58
William Hilton Pkwy. / Gumtree Rd 23 12 13 +77
Wiliam Hilton Pkwy. / Wilbom Rd 21 18 20 +5
William Hilton Pkwy. / Pembroke Dr 29 25 32 -9
Wiliam Hilton Pkwy. / Whooping Crane Way 0 2 4 -100
William Hilton Pkwy. / Beach City Rd 39 66 29 +34
Wiliam Hilton Pkwy. / Mathews Dr. (north) 90 73 80 +12
William Hitton Pkwy./ Dillon Rd. 72 102 85 -15
William Hilton Pkwy. / Coggins Point Rd 0 2 0
Wiliam Hilton Pkwy. / Beachwood Dr. 75 99 157 -52
Wiliam Hilton Pkwy. / Mathews / Folly Field 132 155 194 -32
Wiliam Hilton Pkwy. / Singleton Beach Rd. 166 191 180 -9
William Hilton Pkwy. / Shelter Cove Lane (ft-island) 48 69 64 -25
Wiliam Hilton Pkwy. / Shelter Cove Lane (central) 28 69 64 -56
: Wiliam Hilton Pkwy. / Queens Folly Rd 3 0 0
Wiliam Hilton Pkwy. / Queens Way 140 171 279 -50
,, Wiliam Hilton Pkwy. / Shipyard / Wexford 26 44 35 -26
William Hilton Pkwy. / New Orleans Rd. 82 83 267 -69
, Wiliam Hilton Pkwy. /AITOW Rd 102 136 242 -58
Pope Ave. /New Orleans / Ofce Park 189 231 403 -53
Pope Ave. / oIdilo Pkwy. 461 532 509 -9
Pope Ave./ Lagoon Road 907 851 914 -1
South Forest Beach Pedestrian Signal 1226 1157 915 +34
Palmetto Bay Rd./ Target Rd. 75 84 74 +1
Palmetto Bay Rd. / Arrow/ Point Comfort 37 35 56 -34
TOTAL 3979 4233 4627 -14
'Of-street refers to pedestrians and bicyclists using sidewalks, pathways, or shoulders, not the roadway. Only
crossings occurring between 7.00 and 9.00 a.m. and 4.00 and 6.00 p.m. are included.
Page 124 of 138
HCS Signalized Intersection Results Summary
General information Intersection information
Agency Town ol Hilton Head Island, SC Duration, h 250
Anab rst Darrin A. Shoemaker, PE Analysis Date Jul 9. 2024 Area Type ther
Jurisdiction SCOOT Tune Period pm peak hour PHF 96
existing
conditions
Urban Street pope Avenue Anet /sis Year 2024 Ana sis Period 1> 17:00
Intersection New Oreans Road /Of.. File Name 24501pm0ex.xus
pro»ct Desa ton pm peak hour - existing conditions
Demand information EB W8 NB SB
Approach Movement L T R L T R L T R L T
Demand (v), ven/h 88 158 184 270 72 29 128 952 324 112 708
Signal Information w
Cvcde, s 160.0 Reference Phase 2
, fOffset, s 0 Reference Point End Green 75 06 820 104 0.3 22 8
Uncoordinated No Simutt Gael EN o Yellow 30 0.0 36 3.2 3.2 32
force Mode Fed Simut Gap NS On Red 44 00 30 4.3 4.4 43
Tiner Results EBL ET W8L wBT NBL NBT sL s
Ass ined Phgse 3 8 7 4 1 • 5
Case Number 20 30 2.0 3.0 11 30 11 3
Phase Duration, s 179 30.3 257 38.2 15.4 89.1 14.9 88
Change Period, (Y+R), s 7.5 76 7.6 76 73 66 74 6
Ma Alow Headwa MAH,,s 31 32 3.1 32 31 0.0 31 0
Queue Clearance Time s,$ 104 21.1 17.6 7.5 8.0 74
Green Extension Time(g), s 01 07 06 09 02 0.0 02 0
Phase Calt Probabilt 0.98 1.00 1.00 099 1 00 0.99
Max Out Probabilt 0.00 0.02 0.00 0.00 0.00 0.00
Movement Group Results EB W8 NB sApproach Movement L T R L T R L T R L T
Assued Movement 3 8 18 7 4 14 6 16 5 2
Adjusted Fow Rate(v), vehh 92 165 192 281 75 30 133 992 338 117 738
Adjusted Saturation Flow Rate (s), vehhn 1723 1828 1567 1422 1826 1620 1706 1522 1615 1654 1521
Queue Serwce Time(g+), s 8.4 136 191 156 55 25 6.0 288 11.1 54 250
Cvcle Queue Clearance Time(ge), s 8.4 13.6 191 15.6 5.5 25 6.0 28.8 1.1 54 250
Green Ratio (9C 0.06 014 014 011 0.19 019 0.56 0.52 0.63 0.56 0.51
Capacity (c) veth 112 250 222 322 349 309 382 1570 1021 294 1558
• g - - • Volume-to-Carat Ratio x) 0.822 0636 0.863 0.872 0215 0098 0.349 0.632 0.331 0.396 0473 0
- Bak of Queue 0,, nn 95 h ercentile) 191 278 351 259 122 48 109 327 154 99 371
I Bak of Queue (Q), vetin (95 th percentile) 7.3 107 135 9.9 4.7 18 42 126 59 38 143
- Queue Storage Ratio (RQ)(95 th percentile) 0.76 0.19 1.25 1.26 0.08 0.27 0.61 022 0 67 0.37 0.58
Uniform Dela di)swveh 73.9 648 67.1 69.8 546 53 4 186 16.6 84 204 25 1
• - • - • • Incremental Dela (dz,s/eh 10.5 1.9 15.9 5.6 02 01 02 12 05 06 1.0
- - Initial Queue Dela ds,,sveh 0.0 00 00 0.0 00 00 00 0.0 0.0 0.0 0.0
Control Dea d«,swveh 84.4 66.7 83.0 754 54.8 535 189 17.8 9.0 21.0 26.2
Level ot Service (LOS) F E F E 0 0 8 B A C C
roach Delay. sNven /LOS 77.3 E 69.7 E 15.8 B 25.1 C
Intersection Dela,, sveh /LOS 336 C
Multimodal Results EB WB NB s8
Pedestrian LOS Score /LOS 2.99 C 2.86 C 256 C 238 B
Bicvde LOS Score Los 3.81 0 3.74 0 3.91 0 3.34 C
Page 125 of 138
INTERSECTION v/c RATIO CALCULATION
501 Pope Avenue w/ New Orleans/Office Park Rds 2025 PM Peak Hour - Existing Conditions
,
05. o.016 /0 0,L----"---------------- ~ +---
0.244 0.037 0.037
"# " [0.310 0.086 0.093
u··,0.048
•
0.050
0.048 + 0.244 = 0.292 0.037 + 0.037 = 0.074
,= 0.050 +0.310=6.369) Aas +o.093 =6.ma = 0.539 x(170/162) = 0.566
0.048 + 0.021 =0.069 """?
• e' • • • -: '@ = @a '@
Page 126 of 138
• Page 16
TABLE SIX- MORNING PEAK HOUR INTERSECTION VOLUME-TO-CAPACITY RATIOS
AND AVERAGE TOTAL DOEUY IN SECONDS PER VEHICLE
JULY 225 ND COMPARABLE 2024, 2020, AND0 215 FIGURES
202$ 2024 2020 2015
Intersection vlc dpv vl¢ dpv vlc dpv vlc dpv
Wm Hton Parkway wth Crosstree DmveC Hennchs Circle 083 137 NOT COUNTED NOT SIGNAUZED
Wm Hton Parkway wth Squire Pope Road/Chamberin Drive 069 219 071 200 073 168 0.92 191
Wm Hton Parkway wth Spanish Wels'Wild Horse Roads 059 145 061 163 069 143 067 141
Wm Htton Parkway wth Gum Tree Road/Cross-/sland Parkway Ramps 072 533 070 468 071 314 080 37
Wm Hton Parkway with Wibom Road/.Jarvs Park Dmve 059 41 059 56 059 46 073 42
Wm Hton Parkway wth Pembroke DmveMuseum Street 057 106 060 106 061 128 061 112
a @ id Wm Htton Parkway wth Whooping Crane Wayndgo Run Drve 054 224 061 213 0 59 195 064 187
·- Wm Hton Parkway wth Beach Cty Road/Gardner Drve 0 46 168 051 182 052 157 061 192
e I • e Wm Hton Parkway wth lathews Drve (northern ntersecton) 043 262 046 285 049 200 050 197
i a Wm Hton Parkway wth Dton RoadPlaza Dmve 0 48 170 045 176 049 153 046 127
• Wm Hton Parkway wth Coggns Pont Road 038 179 038 152 045 143 036 129
WmHton Parkway wth Beachwood Drve 030 18 029 14 034 19 032 14
Wm Hton Parkway wth Foly Field RoadMathews Drive 045 221 040 219 047 221 039 225
Wm Htton Parkway wth Singleton Beach Road 043 33 040 44 0 50 36 0 46 27
Wm Hton Parkway wth Shetter Cove Lane (off-island intersection) 043 26 038 31 046 35 NOT SIGN«Lu2ED
Wm Hton Parkway wth Shelter Cove Lane (center intersecton) 041 60 041 58 048 47 048 65
Wm Hton Parkway wth Queens Foly RoadKng Neptune Way 037 265 037 239 047 33 054 200
Wm Hton Parkway wth Queens Way 036 47 036 49 040 56 036 43
Wm Hton Parkway wth Shipyard'Wexford Dmves 042 197 040 167 043 152 037 102
Wm Hton Parkway wth New Orleans Road/Village at Wexford 033 88 035 9.1 036 72 030 138
Wm Hton Parkway wth Arrow Road 041 22 037 232 031 16 0 030 n77
Pope Avenue wth New Orleans/Ofe Park Roads 0 44 250 045 258 034 n78 036 182
Pope Avenue wth Cordillo Parkway 0 46 263 044 27 5 037 198 030 196
Pope Avenue wth Lagoon Road8each Parang Lot 021 127 018 99 0 20 109 NOT SIGNALIZED
Palmetto Bay Road wth Target Road\sland Crossings Shopping Or 052 127 053 132 056 134 049 143
Palmetto Bay Road wth Arrow.Point Comtot Roads 050 199 049 17 5 048 190 049 166
ve- intersecton Volume-to-Capac.My Rato
dpv - Average Total Delay-per-Vehicle in seconds
NOTE Operatonal condtoons /aeng to comp'y wt goals set tort in the LAO are sown in
Page 127 of 138
Table Seven –
Afternoon Peak Hour
Analysis Results
• Page 16
ABLE SEVEN - AFTERNOON PEAK HOURINTERSECTIONVOLUME-TO-CAPACITY RATIOS
AND AVERAGE TOTAL DELAY IN SECONDS PER VEHICLE
JULY 225 AND COMPARABLE 2024, 2020, AND 2LS5 FIGURES
2025
r 2024 2020 2015
Intersection vl¢ dpt vlc dpv vlc dpv vlc dpv
Wm Hilton Parkway with Crosstree Drive/C Hennchs Circle 089 91 NOT COUNTED NOT SIGNALIZED
Wm Hilton Parkway with Squire Pope Road/ChamberlinDrive 1.01 62.6 0.99 476 1.13 79.9 1.10 58.5
Wm. Hilton Parkway withSpanish Wels'Wid Horse Roads 066 276 0.65 229 075 234 079 252
WmHiton Parkway with Gum Tree Road/Cross-/stand Parkway Ramps 072 48.0 0.69 534 072 347 088 26.1
WmHiton Parkway with Wilborn Road/.Janis Park Drive 0.71 148 0.70 125 070 103 0.75 6.4
Wm. Hilton Parkway with Pembroke DriveMuseum Street 0.66 24.5 0.65 21.7 0.67 20.0 0.73 262
Wm. Hiton Parkway with Whooping Crane Way/ndigo Run Drive 070 21.3 070 19.8 0.75 186 082 194
Wm. Hilton Parkway wth Beach City Road/Gardner Drive 062 168 063 239 072 242 071 122
Wm. Hilton Parkway with Mathews Orve (northern intersection) 058 289 063 339 066 206 068 288
Wm Hilton Parkway with Dillon Road/Plaza Dmve 063 191 062 207 066 127 067 141
WmHton Parkway with Coggins Point Road 056 143 056 14.5 061 104 059 167
Wm. Hilton Parkway with Beachwood Drive 042 22 041 1.8 050 1.8 048 18
Wm. Hilton Parkway with Folly Field Road/Mathews Drive 057 33.1 0.63 33.1 0.65 26.9 065 263
Wm Hilton Parkway with Singleton Beach Road 046 36 050 43 O.55 38 0 46 4.0
Wm Hilton Parkway wth Shelter Cove Lane (off-island intersection) 0.46 38 0.50 47 0.54 46 NOT SIGNALIZED
Wm Hiton Parkway with Shelter Cove Lane (center intersection) 045 14.6 049 159 055 123 064 16.0
Wm Hilton Parkway with Queens Foy Road/King Neptune Way 051 304 0655 317 067 2a7 081 447
Wm Hiton Parkway with Queens Way 040 48 047 60 066 72 066 77
WmHton Parkway with Shipyard'Wexford Drves 050 202 055 230 064 214 056 154
Wm. Hilton Parkway with New Orleans Road/ilage at Wexford 059 226 0.65 228 064 17.0 057 278
Wm. Hilton Parkway wth Arrow Road 049 34.3 056 43.6 0.46 288 048 223
Pope Avenue with New Orleans/Office Park Roads 057 30.9 063 336 057 238 062 29.6
Pope Avenue with Cordillo Parkway 050 30.9 049 331 053 249 0.61 241
Pope Avenue with Lagoon RoadBeach Parking Lot 040 231 039 234 050 318 MOT SIGN4Lu2ED
Palmetto Bay Road with Target Road/sland Crossings Shopping Ctr 054 239 058 249 051 224 059 23$
Palmetto Bay Road with Arrow/Point Comfort Roads 074 257 076 284 066 267 o72 261
vie - IntersectionVolume-to-Capacity Ratio
dpv • Average Total Delay-per-Vehicle in seconds
NOTE. Operational conditions fang to compy wth goats set tortn in the LMO are shown in
Page 128 of 138
Change
From June
2024 to July
2025
• Page 13
Decrease
from 2024
in all 3
peak hours
Morning Peak Hour Demand -07%
Midday Peak Hour Demand -2.0%
Afternoon Peak Hour Demand -4.2%
•
•
Page 129 of 138
General lnformation
4nabyst Carrin A Shoal. Pt hters,etie Su Pines rde
qenyor o Kt LW Street tare Greenwood Dr/wmn +ton..
Date Performed 07/98/2025 MS Snet Nam lnoeto toy Rd.,/ope e.
4n3»,is ear 222$ rob,is Tire erod, Ms 02s
Tee #mated we pee hour - eistng ct. Peal Mor Facto 0e6
Projet Description 202$ TM&t Report Jrsod iron $coo
Volume Adjustments and Site Characteristics
pproah t w9 Me st
#overvet u
I
L t a u
I
L • u
I
T
I
R u T
I
•
turnber at Lare N 0 0 0 0 0 0 0 0 0 0
Loe ssigeent UR r rt Lr
Mure lvet9 • 279 10 0 0 2s 22a 158 6 s1 33 195 • 195 52 4$6
Perent Hesay Veicier, M% $ s $ 5 5
Few» Rate wed, pey • 31 12 98 0 2s0 278 193 62 411 23 0 238 a0 $s7
Rght-Tum yposs on-'Yielding Non-Yielding Nor-ieldrg Nor-Yeding
- • - CenfictingLanes• Petestrare rosing ph 0 • 0
- Proporticn tAs, % 0
Critical and Follow-Up Headway Adjustment
¢ - roach t w t3 Se
• Lare +et Right pp0ss et in boss Len Rot bypass Lett Right bypass
i Critical achwy, 49763 49763 4.9763 49763
• fotow-3 Hg0way.,$ 26087 26cc87 26087 26e7
Flow Computations, Capacity and v/ Ratios
oporah El w N9 50
Lare Let Right 8/poss et ugh brass Left it bypass Left tight bypass
tryFew MA, poh 533 9€ s28 193 40 21e 7a 557
Entry Volume, ve#A sce 92 $03 134 457 227 836 530
Circulating owtw4, ph 113s 821 7 $97
ting flow {wl pc/ 430 340 rs2 897
Caaity (lph 434 $97 629 751
Cady (veth 413 569 $99 1v Ratio ! 123 ¢99 07 1,M7
Delay and Level of Service
pprot .. wt ta $3
Lave Lett gmt ypMs et n ypass et igt. bypas Let Rig ypons
Lano Controt Delay 4n1 wt 151 412 26 n123
Lune LOS A A 0 # 4
9% Qee Length, Qnes pet) 209 12 7.0 2it
95% Queue Leng Q /ti 434 252 1820 696
Approach ety. wen ]Ls 1282
I
22 0 19 c +87
I
nrsecionDelay. s/we] Lo$ t1
Page 130 of 138
• Page 14
a a • a a
¢
TABLE FIVE - JULY 2025 HCM ANALYSIS TOTAL AVERAGE DELAY PER
VEHICLE RESULTS ON APPROACHESTO SEA PINES CIRCLE (in seconds)
AM Peak Hour Midday Peak_Hour PM Peak Hour
2025 2024 2025 2024 2025 2024
Greenwood Drive 128.2 (76.8) 50.9 (47.3) 59.0(61.5)Palmetto Bay Road 68.7 (49.2) 38 O /27.1) 222(19.2)Pope Avenue 17.8(13.4) 28.6 (23.4) 74.9(52.2)William Hilton Parkway 30.2 (17.0) 54.9 (34.8) 40.1(37.0)
Page 131 of 138
William Hilton Parkway &
Squire Pope Road/
Chamberlin Drive
Intersection
• Pages 18-19
1
• 4 , o""794», gee
V~ ~-...
m
reg]}7flKu''
. ,{ "is
f %<°$
$$
t
%R%.
-~r:
I
..
Page 132 of 138
William Hilton Parkway &
Gum Tree Road Intersection
• Pages 19-20
4
«
' €
EE;a 'it "}
E
,
-
;
·~~ ,
-
\M
~
ea •
~
M3, s
ff$?3zgs "i
k4 ,"_Alull ""Rx,
""r, •
•
Page 133 of 138
Town Council modified the operational goals outlined in Section
16-5-106.C of the LMO by enacting ordinance 2025-18 last
August. This ordinance added two additional goals to the
longstanding capacity- and delay-based operational goals
described in this section. The two operational goals added:
• Pages 20-24
TABLE EIGHT- INDIVIDUAL TRAFFIC MOVEMENTS DECLINING BY
MORE THAN ONE LEVEL OF SERVICE - JULY 2024 TO JULY 2025
• • a • •• • • •• • • AM/PM 2024 2025Intersection Movement Peak
Hour dpy LOS dpy LOS
Wm. Hilton Pkwy Eastbound Left Turn
w/ Squire Pope Rd from Wm. Hilton PM 10.8 B 46.8 D
/ Chamberlin Dr Pkwy.
Wm. Hilton Pkwy. Eastbound Wmw/ Gum Tree Hilton Pkwy. Through PM 19.9 B 35.9 D
Rd./XIP Ramps
Pope Avenue wt Southbound Right
Gordillo Parkway Tur onto Gordillo PM 8.8 A 20.5 C
Pkwy
Wm. Hilton Pkwy.
Sea Pines Circle Entering Circulating AM 24.2 C 41.2 E
Roadway
dy -- Average Total Delay per Vehicle in seconds
.. • • • • • a • • •• • TABLE NINE -- INDIVIDUAL TRAFFIC MOVEMENTS DECLINING
FRoMLosEToLQsE-JuY2024roJuLY 2025
• • a ••a • • • • • • •• •
a • • • • • • AM/PM 2024 2025• g e'g • • • Intersection Movement peakHour d¥. LOS dpx. LOS
• • • • • • • • • Northbound Left Turn AM 751 E 80.8 F• • • • from Chamberlin Dr.
• • Wm. Hilton Pkwy Northbound Through• wl Squire Pope Rd from Chamberlin Dr. AM 75.5 E 80.9 F
/ Chamberlin Dr
Southbound Left Turn AM 78.8 E 83.9 Ffrom Squire Pope Rd
Wm. Hilton Pkwy. Northbound Left Turn
wl Spanish Wells I from Spanish Wells AM 77.8 E 86.8 F
• - - - • • • • Wild Horse Rds Rd• • • • e Wm. Hilton Pkwy Eastbound Left Tum
@e • • • • • • @'e • • • • • w/ Beach City from Wm. Hilton PM 79.2 E 87.4 F
e e e Rd /Gardner Dr. Pkwy.
Wm. Hilton Pkwy. Northbound Left Tum
• • .a w/ Dillon from Plaza Dr PM 78.5 E 80.3 F
Rd./Plaza Dr
Wm. Hilton Pkwy. Southbound Left Turn PM 75.3 E 88.4 Fwl Arrow Rd. from Arrow Rd.
Pope Ave. w/ New Westbound Left Tum
Orleans/Office from New Orleans PM 75.4 E 81.4 F
Park Rds. Rd.
Pope Ave wl Westbound Right
Gordillo Pkwy Turn from Gordillo. PM 69.6 E 80.2 F
Pwv.
Sea pines Circle Southbound Palmetto AM 49.2 E 68.7 FBay Road Approach
dy- Average Total Delay per Vehicle in seconds
Page 134 of 138
%,%
\..._
r
$
/"
..°""«e s•
$«o
s7
¢=
).._,.._._
cJ<--$<y..Or,...O
«"8 •.sf
4L_
••
-0
•
•
•
•
•
•
- @
e'@e
•
•
APPENDIX B
PAGE B-2
towoo ttto oat ts£a
teat.atpot
et-
Town of Hilton Head Island
24-Hour Traffic Count Locations
July 2025
etetti.toet.teeroodleetee eel
Page 135 of 138
ob horuany ore ohtee At Lare Ma vu le le khy lore a.tlrr ortr corm tebee aloe herbe re Renter ire35229 4715 ' o4
s $33 1 $1001 ' 6929
me 5044.2 1 982 1 498 1 47354et 4I 432
,e 63 $;791
:• 9793 042 420.79 s29rs39 $279 s76 $0¥ 63I 3 as,20 90 619/1 518 $0071
4tat% $oeo $943 4t9 183 • $to4 $414 st9 $3)9 st1a $tu452 $71 $1 $ a/ ,2 s 27 S 6$45 s913 52002 43s2 ses90 $91n3
so9 $732 641 6 $03I 6191 a $271s $;8 $444 %2 «c2. 406.23
$9603 6.74 6M636 0o 3 1 $tut 6261& 63a 421M 8$92 6657 3519
$0%1 49ss 629 6417 1 at.0 6±# • 4t) 4n0 • t4» • $0067 $9201
$221 99 4092$
........
6u» $940 6292» • er 9 587M • """ 9 41$ $211Soos 10 9999 1o 56003 10 t0 $302% to 42791 L 626.2$ 0 444.39 12 5et 10 62022 L0 $6438 10 $6314091 1 6.$ 1 a " 1 49 t 6316
a .1 6536 11 5079 11 106¢ 11 5193 11 779337s 2 $20 t ta1 12 621t9 1 $34au u t15 a $914 2 st19 u 3 a s732 a $0s1so.22 1 5641 1 656$1 " 494.2 13 ii '.' cu 1 $9065 » 6054 13 547 13 920 u 6003 1 46351
4o.2 " 46360 vane 14 6315 ta 6;2+
ii .4 62at 1t 4u2 1t 1.2 it 60727 1a 9716$632 1s at7 1s $9240 1» 6411¢ 1$ 42) 15 971 1$ 629%9 .$ 63369 18 $73a 1$ 16 1$ 48$6 1$ $19$994 1 3249 t 113
a iis 16 61$25 1 $9 .$ 9s.2 s $9n2 1¢ 43rs 16 40220 16 $921I
567 11 $5025 1 «o9so 1 624 " 437t 7 7 44t 17 $9s0 7 44 1 56264 17 94226 1i 0222 18 64036 " 1t $?
a a a 7s9 1s s220 1u 44 1a $735 1s 5$145
36M9 19 $Moo 1 4as.24 19 41st 19 $9» 19 9 s 19 $ 19 4$¢ 19 890 19 23$0as 20 s.1 ii 20 $0$ 20 62$4.0 2o 509 o 811? 2 $6769 20 es2 20 999a a0 479449t 2 9a9 " 6$752
ii 21
::.;::·"
1 61061 " .2/ 1 14 1 619 " 949/0 " 4927 2 9.2 2 639 22 $29.2 2 60190 22 $36 2a 6ts 2a s.299 a $913s26 " 4127 2 a9on9 2 ti.' 2 1 621 21 " $0 1 $45 " 1M 2 417 1 o2329o 2 54624 2 61158
ht ja t9to q4 33 1a4 6$3 24 44.290 24 9000 2 2r 2 $9 4 7215
l r 2s 9n3 2 c9 1s 4t7ts 15 932 2s s $6124 1s s1102 1s $12 1s 632$3 1s 241$
• • ... • 329s 2 647 M 6391s 2 9e0I 26 $423
a 2 6 476 " $1007 2 4112 2 coo.2e 2 $0329
5071: » 6. 2 6310 2 so19o 17 6Mt? 1» " s233 1 60073 1 $0108 2 $90 2 3139 1 s14a3 2a 6030 »a u cn7 2s 6» 2a 2a 6oe1 t 62519 2 409 28 $75 28 $34 s 42101
9.2 1 6co3 19 19% 19 0¥. 29 $2545 29 621$3 »a 29 $7»9 29 is 29 4¢ 29 $032$83 M 4537 30 63,us9 30 4 30 3eo so 6397 " $279 0 $5$3 90 99 0 4068 90 266o$2n 3 599002 1 .o 3 6491 it «47 3 97 »1 $33
I 4$$3 $9i 58626 62968 463 6232 6is sm $62s8 $00.± $3a1 so90
• ...- 1ao 1$9 4us 141u $±1% 131J% 129 472% 1 04¥ 441 -327% -1$9%
• • ... eei g Hr M boost Monett i-de hg. re2 tgs63 #et 62965 ·) ' 23-a o9a on the 1o, pt lotae pee rut vu6t $$16022 lair 23n l 1e 9s nee th 1per lieree$96M . , lily 620 -1 1A : vonow asor owow hetee 2 43$%
e • 989a 1 May 43 1 2Mun 6±!$23» Mart $6.2 tit 82$149 tat $0M + -ii 214432 Otote $015 ·1 t.Apr en73
Spee $625a +1 4-Age 6a.23
hetrwry $u 1 2n gin9 titastr'@)
Moot $M41 10 2Mau or; u 3p 6633
Dearetae so70 ·1 1 2-Mi 6toe • t1Ml 66165
iauarr 4$43 " 3-l 6ota +$ b0-er 6144
1» 2$A 47a3 • 2Mn 694 21kn 67 st s4.21
1% 19n 67#.9 65752
1 15-Mu "m 6$41 22a 67143 664% sues 0es etde
a 2 67115 447 $¢ $-4 a1019 14Ma 671t 65310 57 %r 63410 tar 67341 " 6922» st 314ta, 3c21 lMl 60012 dd 506 $9 17i 617n2 1-Ml 69 ts/h totireDy --» 13 64932 6 14a, t328
23 in a.o 6 4929 61 1$Ma a21a tau ts 1 6491s 6l 21Ma 412s 21Mo 63 e a89 6) 27Mn 6462
2 19-kl .7 a,0 • 194 415s8
n 29Aug 653 as1s % p.A at12a 1%uu 4 » ...., e 2A i029 1Mua 6a.' s2 19-Mal 64526 67 1Mt a4790 Ma et4 $1 -a 64$1 u 1#Ma 09 Pct -231 2a 44a t 14pun at 9 2»Ma 6991s
u 13Ma 6. " 17-or 44 " 29-Ma, 61
Page 136 of 138
€2u, S, Department
of Transportation
Federal Highway
Administration
Office of Highway
Policy Information
Page I
TRAFFIC VOLUME
TRENDS
July 2025
Travel on all roads and streets changed by +1.7% (+4.9 billion
vehicle miles) for July 2025 as compared with July 2024, Travel for
the month is estimated to be 296.0 billion vehicle miles.
The seasonally adjusted vehicle miles traveled for July 2025 is 276.6
billion miles, a +1.6% (+4.4 billion vehicle miles) change over July
2024. It also represents a +0.5% change (+1.5 billion vehicle
miles) compared with June 2025.
Cumulative Travel for 2025 changed by +0.9% (+17.1 billion vehicle
miles). The cumulative estimate for the year is 1,919.0 billion vehicle
miles of travel.
Estimated Vehicle-Miles of Travel by Region - July 2025 - (in Billions)
Change in Traffic as compared to same month last year. • I
•
0
•
tee. A data tor ts north ne preeieminney. Revset vshoe thee pnevus month ahhowm in Tables 1and2
#t wetwice-mes. otrowel computed with hey Sastis 2023 Table v-2as a bas
Comrpoded wah data on hand as ot September 03, 2025.
Some historical deta were newsed based on MS ind mended TVT ta as of Deeter 2023.
fr inform.ton on total' kenned driers in the tu.S http://www.tho.dot.gov,poly/opt./hpubs.htm.
Select the year o interest then Seton 6 (Doer Licensing
for intorraton on total topstere motor weices in the .S., vit http.//wow.he.dotgov/porev/ohp/ts/hssobs.tm
Select the wear ot interest and Scton ? Motor veides.]
To faoleant hstori nbis, the yMT tug, tr the seasonally adhostd' series, have been opated for the 1? months onor tthe ourent month and in alotter months., held a the value tom lost months rise.
Page 137 of 138
Darrin A. Shoemaker, P .E., PTOE
(843)422-7649
Darrin.Shoemaker@ice-eng.com
Theresa M. McVey
Traffic Operations Manager, IMSA LEVEL II
(843)341-4778
theresam@hiltonheadislandsc.gov
Page 138 of 138
Source: Town of Hilton Head Island website. First collected Oct 13, 2026.