RecordWell Data

Planning Commission Meeting — Agenda Packet

Town of Hilton Head Island · Beaufort County · Planning Commission · meeting of Jul 15, 2026 · Agenda packets

Open the original document More from Town of Hilton Head Island

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Town of Hilton Head Island Planning Commission Meeting Wednesday, July 15, 2026, 2:00 PM 1 Town Center Court, Hilton Head Island, SC Benjamin M. Racusin Council Chambers The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County Channel, and Spectrum Channel 1304. 1. Call to Order 2. Pledge to the Flag 3. Adoption of the Agenda 4. Approval of the Minutes a. Regular Meeting Minutes of June 17, 2026. 5. Unfinished Business 6. New Business a. STDV-000427-2026: Public Hearing request from Tashika Simmons, owner of 78 Oakview Road, for a Street Name Application to name an existing access easement off Spanish Wells Road. The affected parcels are identified on Beaufort County Tax Maps as R510 010 000 004C 0000, R510 010 000 004B 0000, R510 010 000 0352 0000, R510 010 000 0004 0000, R510 010 000 004G 0000, R510 010 000 004F 0000 and R510 010 000 0404 0000. b. STDV-000576-2026: Public Hearing Request from Kenneth Simmons, owner of 686 Spanish Wells Road, for a Street Name Application to name an existing access easement off Spanish Wells Road. The affected parcel is identified on Beaufort County Tax Maps as R510 010 000 0016 0000. c. PPR-000590-2026: Public Hearing request from Neal Eike, with the Town of Hilton Head Island, for an Application for Public Project Review for the property identified on Beaufort County Tax Maps as Parcels R550-014-000-0954-0000 & R550 010 000 0454 0000, also identified as 4 Helmsway Way for the renovation of the current skate park and the development of a new pump track on a Town owned parcel. d. Annual Traffic Monitoring and Evaluation Report — Section 16-2-103.J.10 of Page 1 of 138 the LMO provides that this report will be prepared and submitted to the Planning Commission annually by the Town Engineer 7. Public Comment - Non Agenda Items 8. Commission Business a. Nomination and Election of Officers for July 1, 2026 - June 30, 2027 Term. b. Appointment of Board Secretary for July 1, 2026 - June 30, 2027 Term. 9. Chairman's Report 10. Staff Reports 11. Adjournment FOIA Compliance: Public notification of this meeting has been published, posted, and distributed in compliance with the South Carolina Freedom of Information Act and the requirements of the Town of Hilton Head Island. In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities. Auditory accommodations are available. Any person requiring further accommodation should contact the Town of Hilton Head Island ADA Coordinator as soon as possible but no later than 48 hours before the scheduled event. Municipal Association of South Carolina (MASC) Civility Pledge: “I pledge to build a stronger and more prosperous community by advocating for civil engagement, respecting others and their viewpoints, and finding solutions for the betterment of my city or town.” Page 2 of 138 Town of Hilton Head Island Planning Commission Meeting Minutes 6/17/2026 Page | 1 Town of Hilton Head Island PLANNING COMMISSION MEETING Wednesday, June 17, 2026, 2:00 PM Minutes 1. Call to Order Vice-Chair Whaley called the meeting to order at 2:00 p.m. In attendance were: Vice-Chair Whaley, Joseph DuBois, Bill Redman, Bruce Siebold and Chuck Lobaugh. Excused were Chair Tom Henz, Ed Cordes, Jeff Turnbull and Margaret Hewitt. 2. Pledge to the Flag 3. Adoption of the Agenda Commissioner Lobaugh moved to approve the meeting agenda as presented. Commissioner DuBois seconded. The motion passed unanimously. 4. Approval of the Minutes a. Regular Meeting Minutes of April 15, 2026. Commissioner Redman moved to approve the meeting minutes of April 15, 2026. Commissioner Siebold seconded. The meeting minutes of April 15, 2026 were unanimously approved. 5. Unfinished Business There was no Unfinished Business. 6. New Business a. STDV-000321-2026- Public hearing request from Valeria Plasse, owner of 201 Wild Horse Rd., for a Street Name Application to name an existing access easement off Wild Horse Rd. The affected parcel is identified on Beaufort County Tax Maps as R510 007 000 016A 0000. Acting Chair Whaley introduced the item and declared the Public Hearing open. Kathleen Litchfield, 911 Communications Manager, presented a proposed access easement located off Wild Horse Road to be named Cimarron Manor. Staff recommends the Planning Commission approve the Cimarron Manor street name application based on the criteria outlined in the Land Management Ordinance Section 16-2-103.O.4. Following the opportunity for public comment and Commission discussion, the Public Hearing was closed. A motion was made by Commissioner Lobaugh moved to approve the naming of the street as presented. Comissioner DuBois seconded. The motion was passed unanimously. Page 3 of 138 Town of Hilton Head Island Planning Commission Meeting Minutes 6/17/2026 Page | 2 b. STDV-000376-2026 - Public hearing request from Chauncey Napoleon Barnwell, owner of Beaufort County Tax Map Parcel R510 007 00D 0007 0000, for a Street Name Application to name the existing access easement serving the property. The affected parcels are identified on Beaufort County Tax Maps as R510 007 00D 0007 0000, R510 007 00D 0003 0000, R510 007 00D 0004 0000, R510 007 00D 0002 0000, R510 007 00D 0002 0000, R510 007 00D 0001 0000, R510 007 000 026B 0000. Acting Chair Whaley introduced the item and declared the Public Hearing open. Kathleen Litchfield, 911 Communications Manager, presented a proposed access easement off Gum Tree Road to be named Nellie Drive. Staff recommends the Planning Commission approve the Nellie Drive street name application based on the criteria outlined in Land Management Ordinance Section 16-2-103.O.4. Following the opportunity for public comment and Commission discussion, the Public Hearing was closed. A motion was made by Commissioner DuBois to approve the naming of the street as presented. Comissioner Siebold seconded. The motion was passed unanimously. 7. Public Comment - Non Agenda Items There was no public comment on non-agenda items. 8. Commission Business There was no Commission business. 9. Chairman's Report Chair 10. Staff Reports Shea Farrar introduced two new staff members to the Commission. The Commission welcomed Kyle Brotherton, Principal Planner and Kendal Wagner, Summer Intern. 11. Adjournment The meeting was adjourned at 2:25 pm. The full recording and a transcript of this meeting can be found on the Town’s website at www.hiltonheadislandsc.gov Page 4 of 138 Page 1 of 7 TOWN OF HILTON HEAD ISLAND COMMUNITY DEVELOPMENT DEPARTMENT One Town Center Court Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908 STAFF REPORT NEW STREET NAME Case # New Street Name Public Hearing Date STDV-000427-2026 Delphine Rufus Court July 15, 2026 Parcel Data or Location: Applicant/Agent R510 010 000 004C 0000 APPLICANT – Tashika Simmons 78 Oakview Road Hilton Head Island, SC 29928 Application Summary STDV-000427-2026 – Public Hearing request from Tashika Simmons, owner of 78 Oakview Rd., for a Street Name Application to name an existing access easement off Spanish Wells Rd. The affected parcels are identified on Beaufort County Tax Maps as R510 010 000 004C 0000, R510 010 000 004B 0000, R510 010 000 0352 0000, R510 010 000 0004 0000, R510 010 000 004G 0000, R510 010 000 004F 0000, and R510 010 000 0404 0000. Staff Recommendation Staff recommends the Planning Commission approve the Delphine Rufus Court street name application based on the criteria outlined in Land Management Ordinance Section 16-2-103.O.4 and enclosed herein. Background Tashika Simmons, applicant, proposes to name an access easement located off Spanish Wells Road. Delphine Rufus Court will provide direct access to 2 homes on the parcel. Due to the zoning in this area (RM-4 – Low to Moderate Density), the 2 dwelling units are the maximum allowed on the parcel. This access easement could potentially serve as access for the surrounding parcels if they are redeveloped in the future. See Attachment A, Site Plan Page 5 of 138 Page 2 of 7 As set forth in LMO Section 16-2-103.O.3.d, Decision-Making Body Review and Decision, the Commission shall hold a public hearing and make a final decision on the application based on the standards in LMO Section 16-2-103.O.4, Street/Vehicular Access Easement Review Standards. Summary of Facts and Conclusion of Law Criterion A: No new street or vehicular access easement, or proposed modification of the name of an existing street or vehicular access easement, shall duplicate, be phonetically similar to, or in any way be likely to be confused with an existing street or vehicular access easement, despite of the use of prefixes or suffixes. (LMO Section 16-2-103.O.4.a). Findings of Fact: 1. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have determined Delphine Rufus Court is not duplicated within the Town or Beaufort County. 2. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have determined Delphine Rufus Court is not phonetically similar to an existing street or vehicular access easement. 3. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have determined Delphine Rufus Court will not likely be confused with an existing street or vehicular access easement. Conclusion of Law: 1. The proposed street name Delphine Rufus Court mmeets the requirements of this criterion. Summary of Facts and Conclusion of Law Criterion B: Name(s) shall be simple, logical, easy to read and pronounce, and are clear and brief. Use of frivolous or complicated words or unconventional spellings in names shall not be approved. (LMO Section 16-2-103.O.4.b). Findings of Fact: 1. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch determined Delphine Rufus Court is simple, logical, easy to read and pronounce. 2. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch determined Delphine Rufus Court is clear and brief. 3. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch determined Delphine Rufus Court does not include frivolous or complicated words or unconventional spelling. Conclusion of Law: 1. The proposed street name Delphine Rufus Court mmeets the requirements of this criterion. Page 6 of 138 Page 3 of 7 Summary of Facts and Conclusions of Law Criterion C: It is desirable to use names that have some association with Hilton Head Island and specifically with the immediate location of the street or place, such as reference to local history or physiographic features. (LMO Section 16-2-103.O.4.c). Finding of Fact: 1. The proposed street name Delphine Rufus Court was chosen because the applicant, along with her neighboring parcel owner, Mr. Kenneth Simmons, agreed upon a name that would honor both their ancestors, Delphine and Rufus, whose lives reflect the strength and contributions of the Gullah families that shaped Hilton Head Island. Conclusion of Law: 1. The proposed street name Delphine Rufus Court mmeets the requirements of this criterion. Summary of Facts and Conclusion of Law Criterion D: Use of a common theme is recommended for names of streets that are associated with one another, such as those within a residential development. (LMO Section 16-2-103.O.4.d). Findings of Fact: 1. The proposed Delphine Rufus Court is not associated with other streets within a residential development. Conclusion of Law: 1. This criterion does not apply to this application. Summary of Facts and Conclusion of Law Criterion E: Streets or vehicular access easements that continue through an intersection should generally bear the same name, except where the street crosses a major arterial or where existing address points on a street require that the street given a different name. (LMO Section 16-2-103.O.4.e). Finding of Fact: 1. The proposed Delphine Rufus Court does not continue through an intersection. Conclusion of Law: 1. T his criterion does not apply to this application. Summary of Facts and Conclusion of Law Criterion F: A street or vehicular access easement making an approximate right-angle turn where there is no possibility of extending the street or vehicular access easement in either direction shall be considered to be continuous and continue the same name. Where there is a choice of direction or a possibility of extending either section in the future, such Page 7 of 138 Page 4 of 7 configuration shall be considered to be an intersection and the street/easement segments extending from the intersection shall bear different names. (LMO Section 16-2-103.O.4.f). Findings of Fact: 1. The proposed Delphine Rufus Court would not make a right-angle turn. Conclusion of Law: 1. This criterion ddoes not apply to this application. Summary of Facts and Conclusion of Law Criterion G. New or modified street names should generally use Drive, Lane, Place, Road, Street, or Way as suffixes. The following street designations should only be used if the street design meets one of the following descriptions. This list is not intended to limit the use of other appropriate suffixes. 1. Alley – A street providing vehicular access to the rear of lots or buildings, usually as a secondary means of access to a property. 2. Avenue – A street that is continuous. 3. Boulevard – A street with a landscaped median dividing the roadway. 4. Circle – A street with a complete loop on the end or a side street that intersects another street at two adjacent intersections. 5. Court – A street terminating in a cul-de-sac, not longer than 1,000 feet in length. 6. Extension – A section of street forming an additional length. 7. Parkway – A street designated as a collector or arterial road, with a landscaped median reflecting the parkway character implied in the name. (LMO Section 16-2-103.O.4.g). Finding of Fact: The proposed roadway is an access easement. Conclusion of Law: 1. T his criterion does not apply to this application. Summary of Facts and Conclusion of Law Criterion H. The suffixes Manor, Trace, and Common shall typically be used to name vehicular access easements. (LMO Section 16-2-103.O.4.h). Finding of Fact: 1. The proposed name is Delphine Rufus Court. While not typically used for easements, the LMO does not prohibit using the suffix “Court.” Conclusion of Law: 1. The proposed street name Delphine Rufus Court m eets the requirements of this criterion. Page 8 of 138 Page 5 of 7 Summary of Facts and Conclusions of Law Criterion I. Where natural barriers, intervening land uses, or developments that break an existing street into two separate streets that are not likely to be reconnected in the future, the streets shall be named in a manner that considers the potential economic impact of the number of address points and type of addresses impacted. (LMO Section 16-2-103.O.4.i). Finding of Fact: 1. The subject street is not broken into two separate streets. Conclusion of Law: 1. This criterion does not apply to this application. PREPARED BY: KML June 29, 2026 Kathleen Litchfield DATE 911 Communications Manager REVIEWED BY: TL June 30, 2026 Trey Lowe Interim Planning Director DATE ATTACHMENTS: A) Site Plan B) Applicant’s Narrative Page 9 of 138 Page 6 of 7 A) Site Plan Page 10 of 138 Page 7 of 7 B) Applicant’s Narrative Page 11 of 138 Page 1 of 6 TOWN OF HILTON HEAD ISLAND COMMUNITY DEVELOPMENT DEPARTMENT One Town Center Court Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908 STAFF REPORT NEW STREET NAME Case # New Street Name Public Hearing Date STDV-000576-2026 Kenneth Lane July 15, 2026 Parcel Data or Location: Applicant/Agent R510 010 000 0016 0000 APPLICANT – Kenneth Simmons 1711 Mallard Court Upper Marlboro, MD 20774 Application Summary STDV-000427-2026 – Public Hearing Request from Kenneth Simmons, owner of 686 Spanish Wells Rd., for a Street Name Application to name an existing access easement off Spanish Wells Rd. The affected parcel is identified on Beaufort County Tax Maps as R510 010 000 0016 0000. Staff Recommendation Staff recommends the Planning Commission approve the Kenneth Lane street name application based on the criteria outlined in Land Management Ordinance Section 16- 2-103.O.4 and enclosed herein. Background Kenneth Simmons, applicant, proposes to name an access easement located off Spanish Wells Road. Kenneth Lane will provide direct access to 4 homes on the parcel. Due to the zoning in this area (RM-4 – Low to Moderate Density), the 4 dwelling units are the maximum allowed on the parcel. See Attachment A, Site Plan Page 12 of 138 Page 2 of 6 As set forth in LMO Section 16-2-103.O.3.d, Decision-Making Body Review and Decision, the Commission shall hold a public hearing and make a final decision on the application based on the standards in LMO Section 16-2-103.O.4, Street/Vehicular Access Easement Review Standards. Summary of Facts and Conclusion of Law Criterion A: No new street or vehicular access easement, or proposed modification of the name of an existing street or vehicular access easement, shall duplicate, be phonetically similar to, or in any way be likely to be confused with an existing street or vehicular access easement, despite of the use of prefixes or suffixes. (LMO Section 16-2-103.O.4.a). Findings of Fact: 1. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have determined Kenneth Lane is not duplicated within the Town or Beaufort County. 2. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have determined Kenneth Lane is not phonetically similar to an existing street or vehicular access easement. 3. Town staff, Town Fire & Rescue Dispatch, and Beaufort County Dispatch have determined Kenneth Lane will not likely be confused with an existing street or vehicular access easement. Conclusion of Law: 1. The proposed street name Kenneth Lane mmeets the requirements of this criterion. Summary of Facts and Conclusion of Law Criterion B: Name(s) shall be simple, logical, easy to read and pronounce, and are clear and brief. Use of frivolous or complicated words or unconventional spellings in names shall not be approved. (LMO Section 16-2-103.O.4.b). Findings of Fact: 1. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch determined Kenneth Lane is simple, logical, easy to read and pronounce. 2. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch determined Kenneth Lane is clear and brief. 3. Town staff, Fire & Rescue Dispatch, and Beaufort County Dispatch determined Kenneth Lane does not include frivolous or complicated words or unconventional spelling. Conclusion of Law: 1. The proposed street name Kenneth Lane mmeets the requirements of this criterion. Page 13 of 138 Page 3 of 6 Summary of Facts and Conclusions of Law Criterion C: It is desirable to use names that have some association with Hilton Head Island and specifically with the immediate location of the street or place, such as reference to local history or physiographic features. (LMO Section 16-2-103.O.4.c). Finding of Fact: 1. The proposed street name, Kenneth Lane, was chosen in honor of the property owner, Mr. Kenneth Simmons. Naming the street after Mr. Simmons preserves the family's connection to the property and recognizes its longstanding lineage. Conclusion of Law: 1. The proposed street name Kenneth Lane mmeets the requirements of this criterion. Summary of Facts and Conclusion of Law Criterion D: Use of a common theme is recommended for names of streets that are associated with one another, such as those within a residential development. (LMO Section 16-2-103.O.4.d). Findings of Fact: 1. The proposed Kenneth Lane is not associated with other streets within a residential development. Conclusion of Law: 1. This criterion does not apply to this application. Summary of Facts and Conclusion of Law Criterion E: Streets or vehicular access easements that continue through an intersection should generally bear the same name, except where the street crosses a major arterial or where existing address points on a street require that the street given a different name. (LMO Section 16-2-103.O.4.e). Finding of Fact: 1. The proposed Kenneth Lane does not continue through an intersection. Conclusion of Law: 1. T his criterion does not apply to this application. Summary of Facts and Conclusion of Law Criterion F: A street or vehicular access easement making an approximate right-angle turn where there is no possibility of extending the street or vehicular access easement in either direction shall be considered to be continuous and continue the same name. Where there is a choice of direction or a possibility of extending either section in the future, such configuration shall be considered to be an intersection and the street/easement segments extending from the intersection shall bear different names. (LMO Section 16-2-103.O.4.f). Page 14 of 138 Page 4 of 6 Findings of Fact: 1. The proposed Kenneth Lane would not make a right-angle turn. Conclusion of Law: 1. This criterion ddoes not apply to this application. Summary of Facts and Conclusion of Law Criterion G. New or modified street names should generally use Drive, Lane, Place, Road, Street, or Way as suffixes. The following street designations should only be used if the street design meets one of the following descriptions. This list is not intended to limit the use of other appropriate suffixes. 1. Alley – A street providing vehicular access to the rear of lots or buildings, usually as a secondary means of access to a property. 2. Avenue – A street that is continuous. 3. Boulevard – A street with a landscaped median dividing the roadway. 4. Circle – A street with a complete loop on the end or a side street that intersects another street at two adjacent intersections. 5. Court – A street terminating in a cul-de-sac, not longer than 1,000 feet in length. 6. Extension – A section of street forming an additional length. 7. Parkway – A street designated as a collector or arterial road, with a landscaped median reflecting the parkway character implied in the name. (LMO Section 16-2-103.O.4.g). Finding of Fact: The proposed roadway is an access easement. Conclusion of Law: 1. T his criterion does not apply to this application. Summary of Facts and Conclusion of Law Criterion H. The suffixes Manor, Trace, and Common shall typically be used to name vehicular access easements. (LMO Section 16-2-103.O.4.h). Finding of Fact: 1. The proposed name is Kenneth Lane. While not typically used for easements, the LMO does not prohibit using the suffix “Lane.” Conclusion of Law: 1. The proposed street name Kenneth Lane m eets the requirements of this criterion. Summary of Facts and Conclusions of Law Criterion I. Where natural barriers, intervening land uses, or developments that break an existing street into two separate streets that are not likely to be reconnected in the future, the streets shall be named in a manner that considers the potential economic impact of the number of address points and type of addresses impacted. (LMO Section 16-2-103.O.4.i). Page 15 of 138 Page 5 of 6 Finding of Fact: 1. The subject street is not broken into two separate streets. Conclusion of Law: 1. This criterion does not apply to this application. PREPARED BY: KML June 29, 2026 Kathleen Litchfield DATE 911 Communications Manager REVIEWED BY: TL June 30, 2026 Trey Lowe Interim Planning Director DATE ATTACHMENTS: A) Site Plan B) Applicant’s Narrative Page 16 of 138 Page 6 of 6 A) Site Plan B) Applicant’s Narrative Page 17 of 138 1 TOWN OF HILTON HEAD ISLAND COMMUNITY DEVELOPMENT DEPARTMENT One Town Center Court, Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908 STAFF REPORT PUBLIC PROJECT REVIEW Case # Project Name Public Hearing Date PPR-000590-2025 Crossings Park 1 July 15, 2026 Project Location Applicant 4 Helmsman Way Hilton Head Island, SC 29928 Parcel R550-014-000-0954-0000 & R550-014-000-0454-0000 Neal Eike Town of Hilton Head Island 1 Town Center Court Hilton Head Island, SC 29928 Application Summary PPR-000590-2026: Public Hearing request from Neal Eike, with the Town of Hilton Head Island, for an Application for Public Project Review for the property identified on Beaufort County Tax Maps as Parcels R550-014-000-0954-0000 & R550 010 000 0454 0000, also identified as 4 Helmsway Way for the renovation of the current skate park and the development of a new pump track on a Town owned parcel. Staff Recommendation Staff recommends the Planning Commission find this application to be consistent with the Town’s Comprehensive Plan (Our Plan) for location, character, and extent based on those Findings of Fact and Conclusions of Law as determined by the LMO Official and enclosed herein. Background Crossings Park has evolved over time into one of the Town's primary community athletic and recreational destinations. Recognizing the need to modernize aging facilities, expand recreational opportunities, and accommodate growing community demand, the Town initiated preparation of a comprehensive master plan for the park. The proposed project consists of the renovation of the existing skate park and construction of a new bicycle pump track within the existing Crossings Park as proposed in the adopted master plan. Throughout 2023 and early 2024, Town Council conducted a series of public workshops to evaluate future improvements to Crossings Park on February 14, 2023, June 14, 2023, and January 23, 2024. The Parks and Recreation Commission reviewed and recommended the master plan on March 14, 2024, and Town Council adopted the Crossings Park Master Plan on May 21, 2024. The proposed improvements do not establish a new public recreational use but rather renovate and Page 18 of 138 2 expand an existing Town-owned park in accordance with the adopted Crossings Park Master Plan. This phase implements long-range recommendations contained in the Town's Our Plan 2020–2040 Comprehensive Plan and Parks and Recreation Master Plan, advancing the Town's goal of providing best-in-class parks and recreation facilities while promoting healthy lifestyles, accessibility, and year- round recreational opportunities for residents and visitors. Description of Project The Town of Hilton Head Island proposes to move forward with the portion of the Crossing Park Master Plan that includes the renovation of the existing skate park and the construction of a new pump track within Crossings Park. The skate park will be improved with updated riding surfaces, modern skate features, improved accessibility, enhanced safety, landscaping, seating, lighting, drainage improvements, and supporting infrastructure. The project also includes construction of a new asphalt pump track immediately north of the skate park, providing a facility suitable for bicycles, scooters, skateboards, balance bikes, and adaptive wheeled equipment. The pump track has been designed to work with the site's existing topography while incorporating landscaped swales, native plantings, retaining walls, and integrated stormwater management features. One retaining wall will function as spectator seating and viewing space. Additional improvements include new pedestrian connections throughout the project area, conversion of the existing Bristol Sports Arena vehicular entrance from Arrow Road to pedestrian-only access. Location, Character, and Extent Per Land Management Ordinance Section 16-2-103.Q.4, Public Project Review Standards, in determining whether or not a proposed public project is compatible with the Comprehensive Plan, the Planning Commission shall consider whether the location, character, and extent of the proposed development is consistent with, or conflicts with, the plan’s goals and implementation strategies. Summary of Facts and Conclusions of Law Findings of Fact: 1. LMO Appendix D-24, Application Deadlines, requires applications before the Planning Commission to be submitted to the LMO Official 30 calendar days prior to the meeting. The applicant submitted the application for this project on June 16, 2026. 2. LMO Section 16-2-102.E.1, Hearing Scheduling, states that when an application is subject to a hearing, the LMO Official shall ensure that the hearing on the application is scheduled for a regularly scheduled meeting of the body conducting the hearing or a meeting specialty called for that purpose by such body. The LMO Official scheduled the public hearing on the application for the July 15, 2026, Planning Commission meeting, which is a regularly scheduled meeting of the Commission. 3. LMO Section 16-2-102.E.2, Hearing Notice, requires the LMO Official to publish a notice of the public hearing in a newspaper of general circulation in the Town no less than 15 calendar days before the hearing date. Notice of the July 15, 2026, public hearing was published in the Island Packet on June 28, 2026. 4. LMO Section 16-2-102.E.2, Hearing Notice, requires the applicant to mail a notice of the Page 19 of 138 3 public hearing by first-class mail to the owner(s) of the land directly contiguous to the proposed project no less than 15 calendar days before the hearing date. The Town owns all adjacent properties. Conclusions of Law: 1. The application was submitted 30 calendar days prior to the meeting date, in compliance with LMO Appendix D-24. 2. The LMO Official scheduled the public hearing on the application for the July 15, 2026, Planning Commission meeting, in compliance with LMO Section 16-2-102.E.1. 3. Notice of the public hearing was published over 15 calendar days before the meeting date, in compliance with LMO Section 16-2-102.E.2. Summary of Facts and Conclusions of Law Findings of Fact: The Comprehensive Plan speaks to the location, character and extent of the proposed project. • The proposed project consists of the renovation of the existing skate park and construction of a new bicycle pump track, together with associated pedestrian improvements, landscaping, grading, drainage, retaining walls, lighting, utilities, accessibility improvements, and related site infrastructure. The project also includes conversion of the existing vehicular entrance serving the Bristol Sports Arena from Arrow Road to pedestrian-only access, improving pedestrian connectivity within the park. • The proposed project represents implementation of the Crossings Park Master Plan and is the renovation and expansion of an existing public recreational facility rather than the establishment of a new public use. • The Town initiated planning for the redevelopment of Crossings Park through a series of Town Council Workshops held on February 14, 2023, June 14, 2023, and January 23, 2024, to evaluate recreational needs, public input, and long-term improvements to the park. • The Parks and Recreation Commission reviewed the proposed Crossings Park Master Plan on March 14, 2024, and recommended its adoption. • Town Council approved the Crossings Park Master Plan on May 21, 2024, establishing a long- term vision for redevelopment and expansion of Crossings Park through phased implementation. • The adopted Crossings Park Master Plan identifies renovation of the existing skate park and construction of a new pump track as priority improvements intended to expand recreational opportunities, improve accessibility, modernize aging facilities, and enhance user safety. • The proposed improvements utilize existing developed recreational areas within Crossings Park and are designed to complement future phases of the adopted master plan while minimizing impacts to surrounding natural resources. Page 20 of 138 4 • The design incorporates modern recreational facilities together with landscaped planting areas, native vegetation, stormwater management features, pedestrian connectivity, and site improvements that are consistent with the design character established within the Town's more recent public parks. • The Comprehensive Plan (Our Plan) identifies Parks & Recreation as a Major Core Value, emphasizing the provision of best-in-class recreation facilities, universal accessibility, and multi-dimensional inclusion across the Town’s public park system. The Parks & Recreation Master Plan Part 1 is an adopted appendix to the Comprehensive Plan and provides detailed system-wide recommendations. • Our Plan includes two goals that directly support upgraded and expanded public recreation facilities: Goal 2: Provide best-in-class recreation facilities and programs in the Island’s public parks. 2.1: Continue to provide high-quality park furnishings and amenities. 2.2: Continue to provide a variety of activities and amenities that meet the needs of the community and contemporary trends. Goal 5: Improve and enhance the Island’s multi-use trail system. 5.1: Identify areas for improved access to public pathways and expansions of the system. 5.2: Enhance pathways to ensure cyclist and pedestrian safety. • The Infrastructure Core Value of Our Plan further supports this project, including: 5.1.2: Evaluate existing Town facilities and identify opportunities for redevelopment or new construction to provide best-in-class facilities. 5.2: Ensure the Town continues to provide services and facilities that meet or exceed community expectations. • The proposed project directly implements the adopted Comprehensive Plan, Parks and Recreation Master Plan, and Crossings Park Master Plan by renovating an existing public recreational facility and expanding recreational opportunities for residents and visitors. • Staff finds the proposed location, character, and extent of the project to be consistent with the goals, objectives, and implementation strategies of the Comprehensive Plan. Conclusions of Law: 1. The Comprehensive Plan supports the location of the proposed project. • The subject property consists of Town-owned parcels located at 4 Helmsman Way, identified as Beaufort County Tax Map Numbers R550-014-000-0954-0000 and R550-010-000- 0454-0000, and is zoned Public Recreation (PR). • The proposed project is located entirely within the existing Crossings Park recreational complex, an established Town-owned public park serving residents and visitors. • The project consists of the renovation of the existing skate park, construction of a new bicycle Page 21 of 138 5 pump track, pedestrian improvements, landscaping, grading, drainage improvements, retaining walls, lighting, utilities, and associated site improvements. The project also converts the existing Bristol Sports Arena vehicular entrance from Arrow Road to pedestrian-only access, improving internal park connectivity. • The proposed improvements occur within previously developed recreational areas and do not establish a new public use, but instead expand and improve an existing recreational facility. • The Our Plan 2020–2040 Comprehensive Plan encourages continued investment in existing public parks and recreation facilities, expansion of recreational opportunities, and implementation of the Parks and Recreation Master Plan. 2. The Comprehensive Plan supports the character of the proposed project. • Crossings Park has long served as one of the Town's principal community recreation destinations, providing athletic and recreational facilities for residents and visitors. • The proposed project represents Phase 1 implementation of the Crossings Park Master Plan, which was developed through an extensive public planning process including Town Council Workshops on February 14, 2023, June 14, 2023, and January 23, 2024; review by the Parks and Recreation Commission on March 14, 2024; and adoption by Town Council on May 21, 2024. • The proposed improvements modernize an aging recreational facility while expanding recreational opportunities through renovation of the existing skate park and construction of a new pump track designed to accommodate users of varying ages and abilities. • The project incorporates accessible pedestrian connections, landscaped planting areas, native vegetation, stormwater management features, spectator viewing areas, lighting, and site improvements intended to improve safety, accessibility, and the overall user experience. • The design enhances the existing character of Crossings Park while reflecting the design standards established in the Town's more recent parks, creating a facility that is consistent with the Town's park system while maintaining a unique identity. • The proposed improvements are consistent with the Parks and Recreation Master Plan objective of reinvesting in existing recreational facilities and expanding opportunities for active recreation. 3. The Comprehensive Plan supports the extent of the proposed project. • The proposed improvements represent the first phase of implementation of the Town Council-adopted Crossings Park Master Plan. • The scope of work is limited to renovation and expansion of existing recreational facilities and associated site improvements within the existing park boundaries. Page 22 of 138 6 • The project includes improvements necessary to support long-term functionality, including pedestrian circulation, grading, drainage, landscaping, lighting, utilities, accessibility improvements, and stormwater management. • The proposed extent of development is proportional to the size and function of Crossings Park and is intended to complement future phases of park improvements identified in the adopted master plan. • The proposed project directly implements recommendations contained in the Our Plan 2020– 2040 Comprehensive Plan, the Parks and Recreation Master Plan, and the adopted Crossings Park Master Plan by modernizing existing recreational facilities, improving accessibility, expanding recreational opportunities, and reinvesting in existing public infrastructure. LMO Official Determination The LMO Official determines this application is compatible with the Comprehensive Plan for the location, character, and extent as based on the above Findings of Fact and Conclusions of Law. Planning Commission Determination and Motion Per LMO Section 16-2-103.Q.4, Public Project Review Standards, the Planning Commission’s role is to determine whether the application is compatible or is not compatible with the Comprehensive Plan for location, character, and extent. PREPARED BY: SF July 1, 2026 Shea Farrar, Principal Planner and Board Coordinator DATE REVIEWED BY: TL July 06, 2026 Trey Lowe, Development Services Program Manager DATE ATTACHMENTS: A) Location Map/Plans B) Narrative Page 23 of 138 CROSSINGS PARK Town of Hilton Head Island, South Carolina PARCEL MAP - SKATE PARK Attachment A Page 24 of 138 CROSSINGS PARK Town of Hilton Head Island, South Carolina PARCEL MAP - PUMP TRACK Page 25 of 138 CROSSINGS PARK Town of Hilton Head Island, South Carolina VICINITY MAP CROSSINGS PARK: SKATE PARK & PUMP TRACK Page 26 of 138 CROSSINGS PARK Town of Hilton Head Island, South Carolina 1 2 3 LEGEND SKATE PARK - REPLACEMENT PUMP TRACK - NEW FUTURE BALL FIELD ARROW RD. PALMETTO BAY ROAD RD. LOW LOW LOW LOW LOW LOWLOW LOW LOWLOWLOWLOWLOW LOWLOWLOWLOWLOWLOWLOWLOW LOWLOWLOWLOWLOWLOWLOWLOW LOWLOWLOWLOWLOWLOW LOWLOWLOWLOW LOWLOWLOWLOWLOWLOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LO W LOW LOW LOWLOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOW LOWLOW LOW LOW LOW LOW LOWLOWLOWLOW 1 2 3 4 5 6 7 8 19 20 21 22 23 2417 18 10 11 12 13 14 15 169 Scale: 1" = 50'-0" 0' 50'25' 100' CROSSINGS PARK 1 32 Page 27 of 138 CROSSINGS PARK Town of Hilton Head Island, South Carolina SKATE PARK 9 11 9 10 10 10 9 9 9 9 9 911 Scale: 1" = 30'-0" 0' 30'15' 60' CROSSINGS PARK HELMSMAN WAY ARROW ROAD BRISTOL ARENA EXISTING TREES EXISTING TREES EXISTING TREES HALF PIPE QUARTER PIPE STAIRS WITH RAIL FUN BOXES KICKER GAPS A-FRAME VARIOUS BANKS HIP BANK PICNIC SHELTER Page 28 of 138 CROSSINGS PARK Town of Hilton Head Island, South Carolina Scale: 1" = 20'-0" 0' 20'10' 40' CROSSINGS PARK HELMSMAN WAY STARTING PLATFORM STARTING PLATFORM VIEWING PLAZA WALL RIDE FUTURE BASEBALL PUMP TRACK EXISTING TREES EXISTING TREES EXISTING TREES Page 29 of 138 June 17, 2026 Crossings Park, Hilton Head Island, South Carolina Parcel Number: R550-014-000-0954-0000 & R550 010 000 0454 0000 Public Project Review NarraƟve The Town of Hilton Head Island is proposing the renovation of the current skate park and the development of a new pump track on a Town-owned parcel located at 4 Helmsman Way. Development of these facilities will contribute to the Town’s Comprehensive Plan goal of providing best-in-class parks and recreation, as well as promoting inclusion, equity and access. This proposed portion of the Crossings Park development will expand and enhance recreational offerings for the community. The proposed renovation of the existing skate park and the addition of a new pump track aim to revitalize this well-used recreational area by improving safety, accessibility, and rider flow while introducing features suitable for a wider range of ages and abilities. The design integrates new planting areas throughout the skate park and pump track to soften the edges, enhance biodiversity, and create a more welcoming landscape setting. Together, these upgrades will create a more inclusive, engaging, and sustainable community facility that supports active recreation year-round. As part of these improvements, the existing vehicular entrance from Arrow Road to the Bristol Sports Arena will be closed and converted to pedestrian-only access, providing a direct connection to the Phase 1 pedestrian pathway leading to the Pickleball complex. The pump track is positioned north of the skate park, adjacent to the future baseball fields, and is carefully shaped to work with the site’s natural undulating topography. The design incorporates planted swales and vegetated areas that both soften the landscape and function as stormwater management features. Thoughtful grading accommodates a series of retaining walls, one of which is designed to double as a spectator railing, enhancing both usability and viewing opportunities. The proposed improvements will build upon the site’s existing character, enhancing its aesthetic quality to align with the design standards established in Hilton Head Island’s more recent parks. The result will be a park that is clearly identifiable as a Town of Hilton Head Island Park, yet distinct in its own identity. The park will be maintained as a welcoming and safe community amenity for both residents and visitors. Attachment B Page 30 of 138 Stephen G. Riley Municipal Complex One Town Center Court  Hilton Head Island  South Carolina  29928 www.hiltonheadislandsc.gov TOWN OF HILTON HEAD ISLAND Planning Commission TO: Planning Commission FROM: Jeff Netzinger, Engineering Director / Town Engineer VIA: Shawn Gillen, Assistant Town Manager Theresa McVey, Traffic Operations Manager CC: Trey Lowe, Interim Planning Director / LMO Official Shawn Leininger, Deputy Town Manager DATE: July 15, 2026 SUBJECT: Annual Traffic Monitoring and Evaluation Report RECOMMENDATION: The Planning Commission review and consider the 2025 Traffic Monitoring and Evaluation Report, discuss its findings and recommendations, and elicit public comments at the meeting in accordance with Section 16-2-103.J.10.c of the Land Management Ordinance (LMO). It is further recommended that the Planning Commission provide its comments on the report as well as any supplemental comments or recommendations to Town Council in accordance with Section 16-2-103.J.10.c.ii of the LMO. SUMMARY: This report and recommendations provided herein are prepared and respectfully submitted to the Planning Commission in accordance with the requirements outlined in Section 16-2- 103.J.10 of the Town’s LMO as Attachment 1. Accordingly, the report summarizes trends in traffic demand within the Town, including July weekday traffic counts at intersections and on major arterials. Also summarized in the report are the results of operational analyses for the weekday morning and afternoon peak volume hours recorded at all the Town’s signalized intersections and Sea Pines Circle. The repo rt includes mitigation recommendations for intersections found to be non-compliant with the operational goals outlined in LMO Section 16-5-106.C. The only intersection found deficient relative to these goals in July 2025 was that of William Hilton Parkway with Squire Pope Road and Chamberlin Drive during the weekday afternoon peak volume hour. Continuous traffic counts conduc ted on the Town’s major ar terials over a consecutive Tuesday, Wednesday, and Thursday in July 2025 showed a 4.0 percent decrease in demand compared to counts from July 2024, which marked the highest annual visitor-season counts ever recorded by the Town. The second- and third-highest visitor-season counts were recorded in July 2021 and July 2023, respectively. Nevertheless, the July 2025 counts were Page 31 of 138 Page 2 of 3 still 6.7 percent higher than those from July 2020, resulting in an annual increase of 1.3% over the recent five-year period. Due largely to the end of toll collections on the Cross Island Parkway on June 30, 2021, traffic counts taken by the Town between the bridges to the mainland and Coligny Circle via the Cross Island Parkway, Palmetto Bay Road, and Pope Avenue have all shown a net increase over the most recent five-year period. In contrast, each count station on William Hilton Parkway between its interchange with the Cross Island Parkway and Sea Pines Circle has experienced a net decrease during this same time. Morning and afternoon peak-hour demand on the Town’s signalized intersections decreased by 1.9 percent during the morning peak hour and 3.9 percent during the afternoon peak hour compared with July 2024. Peak-hour demand at Sea Pines Circle also declined relative to July 2024, decreasing by 0.7 percent during the morning peak hour, 2.0 percent during the midday peak hour, and 4.2 percent during the afternoon peak hour. Compared with July 2024, several inters ections along William Hilton Parkway between Whooping Crane Way/Indigo Run Drive and the Shelter Cove area experienced increases in morning peak-hour demand, while other inte rsections throughout the Town recorded decreases. Nearly all intersections within the Town experienced reductions in afternoon peak- hour demand in July 2025 comp ared with July 2024. Notable exceptions included the intersections of William Hilton Parkway at Gum Tree Road and Wilborn Road/Jarvis Park Drive, as well as the pedestrian signal on South Forest Beach Drive near Coligny Circle. Demand on the Cross-Island Parkway and Palmetto Bay Road has increased by an effective 22.3 percent since the end of toll collections in June 2021. Approximately 38 percent of on- and off-island traffic is using the Cross Island Parkway versus Wm. Hilton Pkwy., compared with 31.5 percent before the end of toll collections. July 2025 counts indicate traffic demand on William Hilton Parkway between the Spanish Wells Road/Wild Horse Road signal and the Cross Island Parkway interchange continues to divide approximately 62 percent to 38 percent in favor of William Hilton Parkway over the Cross Island Parkway. BACKGROUND: Section 16-2-103.J.10 of the LMO provides that this report will be prepared and submitted annually to the Planning Commission for their review and discussion at a public meeting. The report is based on traffic counts that are collected annually by the Town each July on typical weekdays, Tuesday through Thursday. The 24-hour arterial counts reflected in the report were collected from Tuesday, July 8 th through Thursday, July 10 th, 2025, and all of the intersection turning movement counts were collected on Tuesday, July 8th, 2025. The counts were certified by the LMO Official as required by Section 16-2-103.J.10.b on January 6th, 2025. Upon their certification in th is regard, the traffic counts summarized herein became the Town’s background dataset for existing traffic demand for use by staff, consultants, and development applicants in thei r preparation of Traffic Impac t Analysis Plan studies that are required to be submitted to the Town as part of the development review process. Page 32 of 138 Page 3 of 3 ATTACHMENTS: 1) 2025 Traffic Monitoring and Evaluation Report Page 33 of 138 ]EINFRASTRUCTURE • CONSULTING & ENGINEERING To: From: Via: Cc: Date: Re: Theresa McVey, Traffic Operations Manager, Town of Hilton Head Island Darrin A. Shoemaker, P.E., PTOE, Senior Traffic Engineer Infrastructure Consulting & Engineering ~,,,· ~,,.,, Bryan Mcllwee, P.E., Project Manager, Infrastructure Consulting & Engineering May 28th, 2026 -~~ ~v f &.J~-♦~ ~r -. - • ;*:er ~~ }*;" ~ a ~.: ~~ ~ ~ '. w ~t~. ·· ffe.:-­, .. ~~ .•~\t-t ,.: . -1. SHO~ :·' ... ,,,,, \\'. . 2025 TRAFFIC MONITORING AND EVALUATION REPORT PART ONE - EXECUTIVE_SUMMARY The Town collected three days of 24-hour bi-directional traffic counts at ten locations on designated major arterials in July 2025 from Tuesday, July 8th through Thursday, July 10th, 2025. Based exclusively on these 24-hour counts, aggregate demand decreased 4.0 percent over the comparable traffic counts collected in July 2024, which yielded the highest aggregate volume count in the Town's history. The effective annual rate of increase in traffic demand recorded via these counts during the most recent five-year period from 2020 to 2025 is 1.3%, although it should be noted that the annual counts conducted in 2020 were atypically depressed due to the onset of the COVID-19 pandemic. The July 2025 count in aggregate represented a decrease over that recorded each year from 2021 through 2024. It should also be noted that the Town historically conducted these counts in June through 2022 and began recording them in July in 2023 due to an LMO revision enacted shortly before then. An examination of traffic counts taken since 2020 has shown that average daily traffic during the month of July typically differs by less than half of one percent from that recorded during the month of June, so relevant comparisons may still be made between the July counts recorded annually since 2023 and those previously recorded in June. The 24-hour counts taken on major arterials on Tuesday, July 8th, through Thursday, July 10th, 2025, were 4.0 percent lower than the comparable counts made one year earlier in July 2024, again the highest annual visitor-season counts ever recorded by the Town. The second- and third-highest visitor-season counts recorded by the Town were in July 2021 and July 2023, respectively. The July 2025 count was still 6.7 percent higher than that recorded five years previous in 2020, however, 181 Bluffton Road, Suite C-102 I Bluffto n, SC 29910 I 843-485-3560 (P) I www .ice-eng.com An Equal Opportunity Employer Page 34 of 138 ]EINFRASTRUCTURE · CONSULTING & ENGINEERING resulting in the effective 1.3% annual increase during the most recent five-year period. Due largely to the cessation of toll collections on the Cross Island Parkway on June 30th, 2021, each of the counts taken by the Town between the bridges to the mainland and Coligny Circle via the Cross Island Parkway, Palmetto Bay Road, and Pope Avenue has experienced a net increase during the most recent five-year period, while each count station on William Hilton Parkway between its interchange with the Cross Island Parkway and Sea Pines Circle has experienced a net decrease during this time. The Town also collected 13-hour turning movement counts from 6:00 a.m. until 7:00 p.m. at all signalized intersections within the Town and at Sea Pines Circle on Tuesday, July 8th, 2025. The morning and afternoon peak volume hours, as well as the midday peak volume hour at Sea Pines Circle, were isolated from these counts. These intersection turning movement counts in aggregate decreased 1.9 percent and 3.9 in the morning and afternoon peak volume hour, respectively, from those recorded in July 2024. Peak volume hour demand on Sea Pines Circle decreased 0.7 percent, 2.0 percent, and 4.2 percent from July 2024 during the morning, midday, and afternoon peak volume hours, respectively. Compared with July 2024, many of the intersections on William Hilton Parkway between Whooping Crane Way/Indigo Run Drive and the Shelter Cove area experienced an increase in morning peak volume hour demand while other intersections within the Town experienced a decrease. Nearly all of the intersections within the Town experienced a decrease in afternoon peak volume hour demand in July 2025 compared with July 2024, with the intersections of William Hilton Parkway with Gum Tree Road and Wilborn Road/Jarvis Park Drive as well as the pedestrian signal on South Forest Beach Drive near Coligny Circle being notable exceptions . South Carolina Department of Transportation (SCOOT) figures for 2025 calendar-year-average daily traffic demand on various roadway segments under their ownership and maintenance jurisdiction within the Town have been released. This data shows a 0.5 percent decrease in demand on the bridges connecting the Town to the mainland from 57,100 to 56,800 in 2025 compared with 2024. This daily average figure was 51,400 in 2020, reflecting a total increase of 10.5 percent during the most recent five years and equating to an effective increase of 2.0 percent per year. The most recent ten years of data, comparing 2025 with 2015, show a nominal increase of 3.8 percent during this period, or an effective annual rate of increase of 0.4 percent. Measurements of the total calendar year traffic demand on US 278 on Jenkins Island made with the SCDOT's continually-operating traffic volume counter show a decrease of approximately one-third of one percent in 2025 from 2024, but an increase of 6.8 percent, or 1.3 percent per year during the most recent five-year period. During the most recent ten-year period from 2015 to 2025, these daily counts on Jenkins Island have nominally risen 1.6 percent, or approximately 0.2 percent per year. 181 Bluffton Road, Suite C-102 I Blufft on, SC 29910 I 843-485 -3560 (P) I www.ice-eng.com An Equal Opportunity Employer 2 Page 35 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING Based on traffic demand figures reported by the Federal Highway Administration (FHWA), total traffic demand nationwide increased 1.7 percent in July 2025 compared with July 2024. Demand in the state of South Carolina was up 3.6 percent in July 2025 compared with July 2024, and increased 2.1 percent in the nation's South Atlantic region, consisting of all coastal states from Delaware to Florida, as well as West Virginia and the District of Columbia. Based on the July 2025 figures reported in Table One on page 9, traffic demand on the Cross Island Parkway and Palmetto Bay Road has increased 22.3 percent over the comparable figures recorded in June 2021 prior to the cessation of toll collections on the Cross Island Parkway. The counts in Table One indicate that bi-directional traffic demand on William Hilton Parkway between the Spanish Wells Road/Wild Horse Road signal and the Cross Island Parkway interchange continues to divide approximately 62 percent to 38 percent in favor of William Hilton Parkway over the Cross Island Parkway, although this has changed from a typical 68 percent to 32 percent split in favor of William Hilton Parkway prior to the end of Cross Island Parkway toll collections. The 62 percent to 38 percent split in favor of William Hilton Parkway over the Cross Island Parkway has been consistent and appears to have stabilized in the years since toll collections on the Cross Island Parkway ended. The only intersection that was analyzed as being out-of-compliance with the Town's operational goals as outlined in the Land Management Ordinance (LMO) in July 2024 was the intersection of William Hilton Parkway with Squire Pope Road/ Chamberlin Drive during the afternoon peak volume hour. This intersection has been identified as being deficient relative to operational goals during the afternoon peak volume hour for many years due to the inability of the two westbound through lanes departing the intersection to afford sufficient capacity to accommodate the heavy off­ island demand that occurs in the afternoon. The intersection of William Hilton Parkway with Gum Tree Road and the opposing Cross Island Parkway on/off ramps was compliant with the Town's operational goals during the morning and afternoon peak volume hours, but was analyzed as being borderline compliant during the morning peak volume hour. A brief discussion of both intersections, including potential mitigative improvements, is undertaken in Part Seven of this report on page 18. PART TWO - INTRODUCTION As required by Section 16-2-103.J.10 of the Town's LMO, this report will summarize July 2025 traffic volume demand on the Town's major roadway network and recommend improvements to mitigate operating conditions identified as 181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-en g.com An Equal Opportunity Employer 3 Page 36 of 138 ]EINFRASTRUCTURE • CONSULTING & ENGINEERING being non-compliant with the Town's adopted operational goals, which are outlined in Section 16-5-106.C of the LMO. The minimum requirements for this report are codified in Section 16-2-103.J.10 as follows: 1) Summary of weekday morning and afternoon peak hour turning movement counts for all signalized intersections within the Town 2) Summary of twenty-four hour volume demand on the Town's major arterial network 3) Historical trends relative to the most-recent five year period 4) Description of existing operating conditions as compared with the adopted traffic goals by utilizing the analysis methodology outlined in the current (2022) edition of the Transportation Research Board's Highway Capacity Manual (HCM), and how these conditions have changed since the previous year's Traffic Monitoring and Evaluation Report, and 5) Recommendat ions on improvements to mitigate any intersections found to be operating out of compliance with the Town's goals. The Town's adopted traffic goals for signalized intersections are outlined in Section 16-5-106. C of the LMO and state that each such intersection within the Town should operate at a volume-to-capacity ratio of 0.9 or lower and that motorists at each intersection must experience an average total delay-per-vehicle of 55.0 seconds or less during both the morning and afternoon peak hours of an average weekday in July, criteria that are applicable to the intersection's operation as a whole. The LMO also outlines operational goals for roundabout intersections, and requires analysis of Sea Pines Circle in calendar years that are evenly divisible by two. The Town often counts and analyzes Sea Pines Circle annually to exceed this codified requirement given the keen public interest in assessments of this unique intersection. Hence, analysis of Sea Pines Circle is included in Part Five of this report on pages 13 and 14. In August of 2025, Town Council revised Section 16-2-103.J of the Land Management Ordinance to expand the standards that signalized intersections and roundabouts are required to meet to include that the level of service (LOS) associated with any individual traffic movement does not decline by more than one level nor to LOS F. A brief discussion on intersections that are non-compliant based exclusively on declining or failing LOS's associated with individual traffic movements is included in Part Seven of this report. This report will examine the morning and afternoon weekday peak hour turning movement demand at signalized intersections within the Town in accordance with the definition of "peak hour" given in Section 16-10-105 of the LMO, which requires that the morning weekday and afternoon peak hour be identified within the two-hour period from 7:00 to 9:00 a.m. and 4:00 to 6:00 p.m., respectively. The LMO requires 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P} I www .ice-eng.com An Equal Opportunity Employer 4 Page 37 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING that this report be based on data collected on a typical July weekday. This enables the analyst and reader to identify deficiencies and base design recommendations on traffic volume demand that approximates typical visitor season demands. The Town retained a traffic counting contractor to collect the data on three consecutive weekdays beginning on Tuesday, July sth , 2025. All of the morning and afternoon peak hour turning movement count data for signalized intersections and Sea Pines Circle summarized in Appendix A was collected on the first of these three days, Tuesday , July 8th, 2025. One additional unsignalized intersection, that of Palmetto Bay Road with Dunnagans Alley, was counted on Wednesday , July 9th, at the request of the Town. Bi-directional 24-hour counts were conducted at strategic locations on the Town's network of major arterials from midnight beginning Tuesday, July 81h, through midnight ending Thursday, July 10th, to collect three representative weekdays of data. An average demand for these three days is shown in Table One on page 9. Town staff typically monitors traffic conditions on these dates to ensure that the collected data is not influenced by atypical events such as adverse weather, road construction, or unforeseen incidents such as traffic collisions. As required by the LMO, this report includes historical data for these 24-hour counts for the most recent five-year period. All of the traffic counts collected in July 2025 were judged by the engineer of record to be consistent with expectations based on historical data, and none of the collected data was judged aberrant or unsuitable for analysis purposes. The operational goals for all signalized intersections as outlined in Section 16-5-106.C of the LMO are based on the intersection's volume-to-capacity (vie) ratio and the average total delay experienced by motorists as a result of operating conditions during the weekday morning and afternoon peak traffic-volume hours. The volume-to­ capacity ratio is essentially a percentage of the intersection's capacity to discharge traffic that is being utilized by all motorized and non-motorized traffic. The denominator in this ratio ("c"), the signalized intersection's capacity, is dependent to a large extent on the lanes available at the intersection and their assignment to individual traffic movements, geometrics such as lane width, storage length, turning radii, signal timing, and the frequency of conflicting bicycle and pedestrian movements. Other factors affecting capacity are more subtle, such as unequal distributions of traffic demand on multiple lanes serving the same traffic movement due to a lane terminating a short distance downstream from the intersection, and the influence on operations from other nearby traffic signals. The numerator in the ratio (''v'') is basically the intersection's hourly vehicular demand adjusted to account for a variety of factors such as variability in demand within the peak volume hour and the percentage of heavy vehicles in the traffic stream. 181 Bluffto n Road, Suite C-102 I Bluffton , SC 29910 I 843-485- 3560 {P) I www .ice-eng.com An Equal Opportunity Employer 5 Page 38 of 138 ]EINFRASTRUCTURE • CONSUL TING & ENGINEERING One of the Town's operational goals for signalized intersections is a v/c ratio in­ indicating that the total volume demand on the intersection is not exceeding 90 percent hours. This percentage is expressed as a decimal fraction in Tables Six and Seven on pages 16 and 17. The other operational goal for signalized intersections is an average total delay of 55.0 seconds or less experienced by all motorists passing through the entire intersection during both the morning and afternoon peak volume hour. The 55.0- second average delay figure is the maximum average delay at the intersection as a whole that is indicative of level of service D for signalized intersections in the Highway Capacity Manual, a measure of operational effectiveness that is commonly considered by traffic engineers to be the effective limit of acceptable operations during peak volume hours in urban or developed areas. It should be noted that total delay experienced by a motorist at an intersection includes, but is not limited to, the time that a motorist is physically stopped in traffic. Delay may also accrue when a motorist is moving forward, such as that which occurs during deceleration or subsequent acceleration back up to the background running speed. The total delay experienced by a motorist at a traffic signal is the actual time required to pass through the intersection, from the time that a motorist brakes in advance of queued traffic until free-flow speed is reestablished on the downstream side of the intersection, less the time that would've been required to traverse the roadway segment at free-flow speed if no intersection, traffic signal, or conflicting traffic were present to impede flow. Total delay is therefore experienced by motorists forced to slow for congestion in traversing an intersection, even if they are able to pass through the intersection without stopping. Total delay is generally not experienced by motorists who arrive at an intersection on a green signal and pass through the intersection at free-flow running speed without slowing. Each time that a traffic signal changes, one group of motorists must come to a stop while flow must be reestablished on a different group of traffic lanes. There are routinely a couple of seconds where no one at all is moving. Therefore, a signalized intersection's capacity can theoretically be increased by changing traffic signals less frequently and minimizing starts and stops. Traffic signals within the Town change less frequently, typically every two to three minutes, during peak volume hours in order to help ensure that capacity is increased and that the Town's capacity-based operating goals are met. Changing signals less frequently to increase capacity, however, means that motorists will be confronted with longer red signals, and this typically increases the average delay experienced by motorists. Therefore, the Town's operational goals counterbalance each other in a way that ensures that capacity is not inordinately reduced by changing traffic signals too frequently , nor delay inordinately increased by changing them too infrequently. As stated on page 4, an intersection may also be considered non-compliant with the LMO operational standards if the level of service (LOS) for any individual traffic 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunity Employer 6 Page 39 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING movement declines by more than one LOS, expressed as a letter grade from A through F, or to LOS F. While this operational standard appears to have been intended primarily to identify intersections that are rendered non-compliant as the result of proposed development, a discussion on intersections that are non-compliant with this standard is included in Part Seven of this report. PART THREE - TURNING MOVEMENT COUNTS AT SIGNALIZED INTERSECTIONS - JULY 2024 PEAK VOLUME HOURS Turning movement counts for all 27 signalized intersections within the Town were conducted from 6:00 a.m. to 7:00 p.m. on Tuesday, July ath, 2025. The peak hours identified from these turning movement counts, as well as a similar 13-hour count made at Sea Pines Circle, are summarized in diagrammatic form in Appendix A. Demand for each individual traffic movement during the identified morning and afternoon peak volume hours, including U-turns, is shown. Separate counts of off-road pedestrians and bicyclists crossing each intersection street approach were also collected and are shown on the diagrams opposite their respective approach. A count of on-road bicyclists is included for each street approach. The total intersection volume demand, including all pedestrians and bicyclists, is shown for each intersection's morning and afternoon peak hours in the center of the diagram, along with the comparable July 2024 figure and the percentage change from July 2024 to July 2025, rounded to the nearest tenth of one percent. This one-year percentage change in the entire intersection demand is also summarized in Table Three on page 11. For purposes of consistency, the on-island direction of William Hilton Parkway is shown on the right side of each diagram for intersections on this arterial, and the compass in the lower-right side of the diagram is rotated to indicate true north. For the diagrams that show Sea Pines Circle or intersections on Pope Avenue or Palmetto Bay Road, the off-island direction toward the Cross Island Parkway that approximates true north is shown at the top of the diagram. PART FOUR -AVERAGE DAILY DEMAND ON MAJOR TOWN ARTERIALS AND INTERSECTIONS Average 24-hour bi-directional traffic demand at strategic locations on major arterials within the Town as counted on Tuesday, July ath, through Thursday, July 10th, 2025 is shown in Table One on page 9. Comparable figures are also shown for each of the ten count locations for each year from 2020 through 2024, enabling five-year comparisons. The effective annual rate of change for the 2020-2025 period is shown in the far-right column for each location. The reader should keep in mind that traffic demand was significantly depressed in 2020 due to the COVID-19 pandemic, and that 181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice -eng.com An Equal Opportunity Employer 7 Page 40 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING this depressed demand in 2020 is reflected in Table One and in the effective annual rates of increase shown in the far-right column. In Table One, the words "east" or "south" refer to the on-island side of the referenced intersection, and the word "west" refers to the off-island side of the intersection. A map showing the location of each count location in Table One is included as Appendix B of this report. The total 24-hour traffic volume counted by the Town in July 2025 as shown in Table One, was 4.0 percent less than that counted by the Town in July 2024, which was the highest demand ever recorded by the Town during the annual visitor-season counts. The total demand measured in July 2025 was 6.7 percent higher than that counted five years ago in June 2020, resulting in the effective aggregate annual rate of increase of 1.3 percent that is shown in the far-right column in Table One's bottom row. Table Two on page 10 shows calendar year average daily demand supplied by the South Carolina Department of Transportation (SCOOT) for US 278 crossing Jenkins Island for each year from 2020 through 2025. These and other SCOOT­ recorded calendar year averages, or MOT's , are shown for a variety of locations throughout the island in Appendix D. The Town's July 24-hour counts typically generate figures that are approximately ten percent higher than the SCDOT's calendar year averages. The total increase in the SCDOT's calendar year average of traffic on US 278 crossing Jenkins Island for the five years from 2020 to 2025 is 6. 7 percent, equating to an effective annual rate-of-change of 1.3 percent during that time. The table that is included as Appendix D to this report reflects total bi-directional demand crossing Jenkins Island on William Hilton Parkway for each day in calendar year 2025. The average daily demand of 55,134 vehicles per day shown at below right in this table considers all traffic crossing Jenkins Island in total during calendar year 2025, a figure that declined 0.35 percent from the average of 55,325 vehicles per day recorded in calendar year 2024. 181 Bluffto n Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunity Employer 8 Page 41 of 138 ][INFRASTRUCTURE CONSULTING & ENGINEERING TABLE ONE 24-HOUR Bl-DIRECTIONAL TRAFFIC DEMAND ON MAJOR ARTERIALS - JUNE 2020-2022 AND JULY 2023-2025* Map 5-year Ref. Location 2020 2021 2022 2023 2024 2025 %change/~r . 1) Wm. Hilton Pkwy . at J. Wilton Graves Br. 58,973 63,304 61 ,628 63,434 63,861 62,444 2) Wm. Hilton Pkwy. west of Cross Is. Pkwy . 49,660 56,270 56,492 57,287 59,513 57,475 3) Wm. Hilton Pkwy . east of Whoop ing Crane 42,120 46,901 41 ,679 40,913 43,321 40,878 4) Wm. Hilton Pkwy . east of Coggins Pl. Rd. 30,655 34,758 29,282 28,146 29,260 27,713 5) Wm. Hilton Pkwy. west of Queens Folly Rd 39,361 43,806 36,678 37,202 36,886 35,263 6) Wm. Hilton Pkwy . west of Arrow Road 26,347 29,682 26,310 26,336 26,131 24,020 7) Pope Avenue south of New Orleans Rd. 31,709 34,156 32,569 34,514 33,373 32,102 8) Palmetto Bay Rd. south of Pt. Comfort Rd. 26,029 27,661 32,634 34,564 34,060 32,785 9) Cross Island Pkwy . south of W. Hilton Pkwy . 16,593 17,734 20,905 22,326 22,910 22,022 10) Cross-Island Pkwy. at Chas. Fra.ser Bridge 26,421 29,256 34,990 37,881 37,362 36,526 TOTAL OF ALL TEN STATIONS 347,868 383,528 373,167 382,603 386,677 371,228 Compos ite Rate of Change - 2024-2025 = Composite Rate of Change - 2023-2024 = Effective Composite Annual Rate of Change - 2020-2025 = -4.0%** +1.1% •• +1.3%** +1.2 +3.0 -0.6 -2.0 -2.2 -1.8 +0.2 +4.7 +5.8 +6.7 +1.3 *The Town began taking its annual traffic counts In July instead of June in 2023 due to a Land Management Ordinance (LMO) revision. **All three rates based exclusively on the data presented in Table One It should be noted that the 24-hour counts taken by the Town and summarized in Table One are located in a manner that enables the calculation of the proportion of motorists that use the Cross Island Parkway as opposed to William Hilton Parkway. Count station number two is taken on William Hilton Parkway just east of the Spanish Wells Road/Wild Horse Road signal, and station number nine is located on the Cross Island Parkway overpasses just east of their merge into William Hilton Parkway. Hence, the number of motorists using William Hilton Parkway instead of the Cross Island Parkway is the total of count station two less that of count station nine. During July 8th-10th, 2025, the average daily vehicle demand on the Cross Island Parkway was 22,022 vehicles, while the combined total of William Hilton Parkway and the Cross Island Parkway just east of Spanish Wells Road was 57,475 vehicles. Hence, (57,475 - 22,022 =) 35,453 of these vehicles, or nearly 62 percent, used William Hilton Parkway. 22,022 vehicles, or 38 percent, used the Cross Island Parkway. 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunity Employer 9 Page 42 of 138 ]EINFRASTRUCTURE . • CONSULTING & ENGINEERING Demand on William Hilton Parkway is 77 percent higher than that on the Cross Island Parkway just east of the point where they divide. The 62 percent of motorists using William Hilton Parkway versus 38 percent using the Cross Island Parkway has rebalanced from 68 and 32 percent, respectively, prior to the cessation of toll collection on the Cross Island Parkway on June 30th, 2021, and appears to have stabilized. TABLE TWO SCOOT 24-HOUR AVERAGE Bl-DIRECTIONAL DEMAND ON JENKINS ISLAND 2015-2025 (calendar year average -AADT) 2015 - 54700 2020 - 51400 2021 - 57400 2022 - 57400 2023 - 57900 2024 - 57100 2025 - 56800 % change 2024 - 2025 : % change 2023 -- 2024: Avg. annual rate of change 2020 - 2025: Avg. annual rate of change 2015 - 2025: -0.5% -1.4% +2.0% +0.4% This annual average daily demand has increased 10.5 percent from the average recorded in 2020, equating to an average annual rate-of-change of 2.0 percent during the most recent five-year period as shown in Table Two above. The information in Appendix E is a report released by the Federal Highway Administration (FHWA) in August 2025 that summarizes levels of and trends in volume demand on roadways nationwide, regionally, and within the state of South Carolina during July 2025. The report indicates that total vehicle-miles traveled in the United States was up 1.7 percent in July 2025 compared with July 2024, and indicates that total vehicle-miles travelled (VMT) in the state of South Carolina in July 2025 increased 3.6 percent relative to July 2024. The FHWA's South Atlantic region of the United States, comprised of all states on the Atlantic seaboard from Delaware south to Florida, as well as West Virginia and the District of Columbia, experienced an increase of 2.1 percent in VMT from July 2024 to July 2025. Table Three on page 11 shows the total combined vehicular, bicycle, and pedestrian morning and afternoon peak volume hour demand on each of the Town's twenty-seven signalized intersections and Sea Pines Circle in July 2025, as well as the comparable July 2024 figure and one-year percentage change. 181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485 -3560 {P) I www.ice-eng.com An Equal Opportun ity Employer 10 Page 43 of 138 ][INFRASTRUCTURE CONSULTING & ENGINEERING A midday count was conducted at Sea Pines Circle based on historical counts that indicate that midday demand far exceeds morning peak hour demand. In July 2025, 3,445 motor vehicles were recorded entering Sea Pines Circle during the midday peak volume hour, compared with 2,872 that entered during the traditional morning peak volume hour. Based exclusively on the data contained in Table Three, total aggregate demand at signalized intersections within the Town and Sea Pines Circle decreased 1.9 percent and 3.9 percent from July 2024 to July 2025 during the morning and afternoon peak volume hours, respectively. The total demand entering Sea Pines Circle decreased from July 2024 during each of the morning, midday, and afternoon peak volume hours. TABLE THREE PEAK HOUR SIGNALIZED INTERSECTION VOLUME - JULY 2024-2025 AM PM 202~ Vol. ~024 Vol. ¾~be, 222~ Y2'- 2224 VQI. ¾Cbg. William Hilton Pkwy. / CrosstrH Drive 4103 - 4887 WIiiiam Hilton Pkwy./ Squire Pope Rd. 4224 4310 -2.0 4904 15047 -2.8 WIiiiam HIiton Pkwy./ Spanish Wells Rd. 39155 4243 -6.8 4385 4693 -6.6 William Hilt.on Pkwy./ GumtrH Rd. 3356 3379 -0.7 4377 4251 +3.0 William HIiton Pkwy./ Wilborn Rd. 2865 2956 -3.1 3595 3570 +o.7 William HIiton Pkwy./ Pembroke Dr. 2756 2894 -4.8 3421 3430 -0.3 William HIiton Pkwy./ Whooping Crane W;:iy 3175 30158 +3.8 3450 3845 -10.3 William HIiton Pkwy. / Beach City Rd. 2780 2963 -6.2 3357 3512 -4.4 William Hilton Pkwy./ Mathews Dr. (north ) 2577 2550 +1.1 3351 3473 -3.5 Willi;:im HIiton Pkwy ./ Dillon Rd. 2253 2161 +4.3 2853 2959 -3.6 William HIiton Pkwy./ Coggins Point Rd. 1901 1831 +3.8 2534 2603 -2.7 William Hilton Pkwy./ Buchwood Dr. 1507 1621 -7.0 2112 2229 -5.2 William Hilton Pkwy./ Mathews / Folly Field 2371 2413 -1.7 3144 3314 -7.1 William Hilton Pkwy. / Singlet on Beach Rd. 2048 2016 +1.6 2805 2863 -2.0 William HIiton Pkwy./ Sh. Cove Ln. (off-is.) 1958 1940 +0.9 2721 2776 -2.0 William Hilton Pkwy. / Sh. Cove Ln. (central) 1977 19152 +1.3 2831 2936 -3.6 William Hilton Pkwy ./ QuHns Folly Rd. 2265 2304 -1.8 3240 3407 -4.9 WIiiiam HIiton Pkwy. / QuHns Way 1694 1711 -1.0 2236 21117 -11.2 William Hilton Pkwy ./ Shipyard / Wexford 1830 1843 -0.7 2657 2802 -5.2 William Hilton Pkwy ./ New Orleans Rd. 1655 1687 -7.8 2322 2542 -8.7 William HIiton Pkwy./ Arrow Rd. 1583 1598 -0.9 2087 2319 -10.0 Pope Ave. I New Orleans / Office Park 1863 2012 -7.4 2894 3099 -6.6 Pope Ave. I &,oq:IJJl9 Pkwy. 1760 1784 -1.3 21117 21577 -2.3 Pope Ave. / Lagoon Road 1072 1017 +5.4 16118 1736 -4.5 South Forest Beach Drive Pedestr ian Signal 600 645 -7.0 1119 1107 +1 .1 Palmetto Bay Rd. / Target Rd. 2315 2380 -2.7 2964 2964 0.0 Palmetto Bay Rd. / Arrow / Point Comfort 2555 2711 -5.8 3273 3327 -1.6 Sea Pines Circle 2872 2892 -0.7 3514 3668 -4.2 TOTAL" 61667 62871 ·1.9 80321 831566 -3.9 2!!2~ Vol. 2!!~ Y!i!I, '{q~be, Sea Pines Circle Midday Peak Hour 34415 3515 -2.0% "Total does not include the intersection of Wm Hilton Parkway/Crosstree Drive due to no comparable 2024 counts being taken at this location I 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3S60 (P) I www.ice-eng.com An Equal Oppor tunity Emplayer 11 Page 44 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING Off-road bicycle and pedestrian crossing demands at signalized intersections within the Town as counted in July 2025 from 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m. decreased by 6.0 percent from those recorded in July 2024, and are 14 percent lower than those recorded in 2020. These demands increased sharply for many years prior to 2020, when demand reached a peak during the COVID-19 pandemic, but have trended moderately downward since. Total off-road bicycle and pedestrian demand recorded in July 2025 was, in aggregate, 14 percent lower than that recorded in June 2020. Very high bicycle and pedestrian crossing demand at the South Forest Beach Drive pedestrian signal near Coligny Circle is included in these figures, and represented 31 percent of the total number of crossings recorded in July 2025. Notably, this pedestrian and bicycle crossing demand at this popular beach park crossing increased 34 percent over that recorded in June 2020. While this crossing demand is prone to wide variations due to weather and other factors, the significant increase in demand on this signalized crossing has significantly offset more general declines in demand at signalized intersections throughout the Town. Table Four below and on page 13, shows the total off-street bicycle and pedestrian crossing demand observed during the morning and afternoon (four-hour) peak volume period at each signalized intersection for July 2025, July 2024, and June 2020. Only these four hours were counted as recently as 2022, and are being considered to enable a direct comparison to comparable demand recorded five years previous in 2020. TABLE FOUR OFF-STREET* FOUR-HOUR PEDESTRIAN / BICYCLE CROSSING DEMAND AT SIGNALIZED INTERSECTIONS - _JUNE/JULY 2020-2025 July July June 5-yr. ¾ Chg. 2025 2024 2020 2020-2025 William Hilton Pkwy. / Crosstree Drive 0 NOT COUNTED William Hilton Pkwy. / Squire Pope Rd. 3 1 0 William Hilton Pkwy. / Spanish Wells Rd. 5 22 12 -58 William Hilton Pkwy. / Gumtree Rd. 23 12 13 +77 William Hilton Pkwy. / Wilborn Rd. 21 18 20 +5 William Hilton Pkwy. / Pembroke Dr. 29 25 32 -9 William Hilton Pkwy./ Whooping Crane Way 0 2 3 -100 William Hilton Pkwy. / Beach City Rd. 39 66 29 +34 William Hilton Pkwy. / Mathews Dr. (north) 90 73 80 +12 William Hilton Pkwy. / Dillon Rd. 72 102 85 -15 William Hilton Pkwy. / Coggins Point Rd. 0 2 0 William Hilton Pkwy. / Beachwood Dr. 75 99 157 -52 William Hilton Pkwy. /Mathews/ Folly Field 132 155 194 -32 William Hilton Pkwy. / Singleton Beach Rd. 166 191 180 -9 (cont'd on page 13) 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485 -3560 (P) I www. ice-eng.com An Equal Opportunity Employer 12 Page 45 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING William Hilton Pkwy./ Shelter Cove Lane (off-island) 48 69 64 -25 William Hilton Pkwy./ Shelter Cove Lane (central) 28 69 64 -56 William Hilton Pkwy. / Queens Folly Rd. 3 0 0 William Hilton Pkwy. / Queens Way 140 171 279 -50 William Hilton Pkwy./ Shipyard/ Wexford 26 44 35 -26 William Hilton Pkwy. / New Orleans Rd. 82 83 267 -69 William Hilton Pkwy. / Arrow Rd. 102 136 242 -58 Pope Ave. / New Orleans/ Office Park 189 231 403 -53 Pope Ave. / Cardillo Pkwy. 461 532 509 -9 Pope Ave. / Lagoon Road 907 851 914 -1 South Forest Beach Pedestrian Signal 1226 1157 915 +34 Palmetto Bay Rd. / Target Rd. 75 84 74 +1 Palmetto Bay Rd./ Arrow I Point Comfort 37 35 56 -34 TOTAL 3979 4233 4627 -14 *Off-street refers to pedestrians and bicyclists using sidewalks, pathways, or shoulders, not the roadway. Only crossings occurring between 7:00 and 9:00 a.m. and 4:00 and 6:00 p.m. are included. PART FIVE - SEA PINES CIRCLE The Town conducted a turning movement count at Sea Pines Circle on Tuesday, July 8th, 2025. As shown in Table Three on page 11, total traffic demand on the circle decreased 0.7 percent during the morning peak volume hour over that recorded during the previous count of the circle in July 2024. Total demand decreased by 2.0 and 4.2 percent from July 2024 during the midday and afternoon peak volume hour counts, respectively. When all three peak volume hours are considered in aggregate, total demand on Sea Pines Circle decreased 2.4 percent from that recorded in July 2024. Compared with comparable figures recorded in July 2020, the July 2025 combined peak hour demand was 4.5 percent lower. The LMO operational goal for roundabout intersections such as Sea Pines Circle is different from the operational goals applicable to signalized intersections, which consider the entire intersection. For Sea Pines Circle, the LMO operational goal is applicable to each specific approach to the roundabout intersection, and is a total delay of 150.0 seconds or less per vehicle on each individual approach. Based on HCM roundabout analysis of Sea Pines Circle and the counts collected in July 2025, the total delay on each individual approach to Sea Pines Circle is shown in Table Five on page 14. The comparable figures resulting from analysis of the previous July 2024 count are shown in parentheses for comparison. 181 Bluffton Road, Suite C-102 I Bluffto n, SC 29910 I 843-485-3560 (P) I www.ice-eng .com An Equal Opportun ity Employer 13 Page 46 of 138 ]EINFRASTRUCTURE • CONSULTING & ENGINEERING TABLE FIVE - JULY 2025 HCM ANALYSIS TOTAL AVERAGE DELAY PER VEHICLE RESULTS ON APPROACHESTO SEA PINES CIRCLE (in seconds) AM Peak Hour Midday Peak Hour PM Peak Hour 2025 2024 2025 2024 2025 2024 Greenwood Drive 128.2 (76.8) 50.9 (47.3) 59.0 (61.5) Palmetto Bay Road 68.7 ( 49.2) 38.0 (27.1) 22.2 (19.2) Pope Avenue 17.8 (13.4) 28.6 (23.4) 74.9 (52.2) William Hilton Parkway 30.2 (17.0) 54.9 (34.8) 40.1 (37.0) Based on the turning movement counts conducted at Sea Pines Circle in July 2025 and the resulting analyses summarized in Table Five, Sea Pines Circle was fully compliant with the LMO-based operational goal in July 2025, as was the case in July 2024, although the increased total delay figure for Greenwood Drive during the morning peak hour is notable. PART SIX - DESCRIPTION OF OPERA TING CONDITIONS RELATIVE TO ADOPTED SERVICE GOALS Analyses of the Town's signalized intersections are based on the traffic volume data collected during the morning and afternoon peak volume hours on Tuesday, July 8th, 2025. The analyses were conducted in accordance with the current (2022) edition of the Transportation Research Board's Highway Capacity Manual (HCM) as required by the LMO. It is important to note that the HCM methodology isolates the peak 15- minute volume period within the hour being analyzed, and bases the analysis results on conditions modeled within this peak 15-minute period, not the average condition experienced during the entire peak volume hour. Hence, the analysis results shown in Tables Six and Seven on pages 16 and 17 are based on the highest-demand 15- minute period recorded within the peak volume hours that are summarized in the count diagrams in Appendix A in accordance with the HCM methodology. A summary of existing volume-to-capacity ratios and average total delay per vehicle resulting from analyses conducted of morning peak hour conditions in July 2025 is shown in Table Six on page 16. Table Six also includes comparable results for July 2024, June 2020, and June 2015 to enable comparisons with analyses of conditions a year ago, five years ago, and ten years ago. The same information for the afternoon peak hour is summarized in Table Seven on page 17. Values that are non-compliant 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunity Employer 14 Page 47 of 138 ]EINFRASTRUCTURE CONSUL TING & ENGINEERING with the Town's operational goals are shown in bold. Tables Six and Seven do not include the pedestrian signal on South Forest Beach Drive near Coligny Circle, as the HCM does not include an analysis methodology for exclusive pedestrian signals of this type. The HCM software outputs used to develop the analysis results summarized in Tables Six and Seven are rather extensive and are not included in this report, but are on file and available for review in the Town's Engineering office. The HCM software outputs the average delay-per-vehicle in seconds at the intersection during the analysis period but does not output the intersection's volume-to-capacity ratio, which must be calculated by hand. Instructions for calculating this ratio are included in the HCM, and a summary of each calculation appears on the reverse side of each respective software output kept on file in the Town's Engineering office. 181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportun ity Employer 15 Page 48 of 138 ][INFRASTRUCTURE CONSULTING & ENGINEERING TABLE SIX· MORNING PEAIC HOUR INTERSECTION VOLUME· TO-CAPACITY RATIOS AND AVERAGE TOTAL DELAY IN SECONDS PER VEHICLE JULY 2025 ANO COMPARABLE 2024, 2020, ANO 2015 FIGURES 2025 2024 Intersect ion vie dpv vie dpv vie Wm. Hilton Parkway with Crosstree Drive/C He1nnchs Circle 0.83 13 7 NOT COUNTED Wm. Hilton Parkway with Squire Pope Road/Chamberlin Drive 069 21 9 071 200 0.73 Wm. Hilton Parkway with Spanish Wells/Wild Horse Roads 059 14 5 0 61 16.3 069 Wm Hilton Parkway wrth Gum Tree Road/Cross-Island Parkway Ramps 072 533 0 70 46 8 0 71 Wm Hilton Parkway wnh Wilborn Road/Jarvis Park Dnve 059 4 1 0.59 5.6 059 Wm Hilton Parkway wrth Pembroke Drive/Museum Street 057 10 6 060 106 0 61 Wm H"dton Parkway wrth Whooping Crane Way/Indigo Run Drive 0 54 22 4 0 61 21 3 059 Wm Hilton Parkway with Beach City Road/Gardner Dnve 0 46 16 8 0 51 18 2 052 Wm Hilton Parkway wrth Mathews Dnve (northern 1rrtersectton) 043 26 2 0 46 285 049 Wm Hilton Parkway with Dillon Road/Plaza Dnve 0 48 170 045 176 049 Wm. Hilton Parkway wrth Coggrns Pomt Road 038 17 9 0.38 152 0.45 Wm. Hilton Parkway wnh Beachwood Dnve 030 1 8 0.29 1 4 034 Wm Hilton Parkway with Folly Field Road/Mathews Drive 045 22 t 040 21 9 0 47 Wm Hilton Parkway wrth Singleton Beach Road 0.43 33 040 44 0.50 Wm Hilton Parkway wrth Shelter Cove lane (off-island mtersect1on) 0 43 26 0.38 3 1 046 Wm Hilton Parkway with Shelter Cove lane (center intersection) 0 41 60 0 41 58 0 48 Wm HIiton Parkway wrth Queens Folly Road/King Neptune Way 037 265 037 239 0 47 Wm HIiton Parkway with Queens Way 036 47 036 49 0 40 Wm Hilton Parkway wnh Shrpyard/Wexford Dnves 0.42 19 7 040 16 7 0 43 Wm. Hilton Parkway with New Orleans RoadMllage at Wexford 033 88 035 9 1 0 36 Wm Hilton Parkway wrth Arrow Road 0 41 232 0 37 23 2 0 31 Pope Avenue wrth New Orleans/Office Park Roads 044 25 0 045 258 0.34 Pope Avenue with Gordillo Parkway 046 26 3 044 27 5 0 37 Pope Avenue wrth Lagoon Road/Beach Parking lot 0 21 12 7 0.18 99 020 Palmetto Bay Road with Target Road/Island Crossings Shopping Ctr 052 12 7 053 132 055 Palmetto Bay Road with Arrow/Point Comfort Roads 050 19 9 0 49 17 5 0 48 vie - Intersection Volume-tO-Capaclty Rauo dpv • Average Total Delay-per-Veh1Cle In seconds NOTE Operauonal condruons fal//ng 10 comply 1V1t11 goals sec rorrn tn rne LMO are sno,vn tn 181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-eng .com An Equal Oppon unity Employer 2020 2016 dpv vie dpv NOT S/GNAUZED 16 8 0.92 19 1 14 3 067 14 1 31 4 0.80 23.7 46 0 73 42 12 8 061 11 2 19 5 064 18 7 15 7 061 19 2 200 0 50 19 7 15 3 0 46 12 7 14 3 0.36 12 9 1 9 0 32 1 4 221 039 22 5 36 046 27 35 NOT SIGNAUZED 47 048 6.5 233 054 200 56 036 4 3 15 2 0 37 10 2 72 0 30 138 16 0 030 17 7 17 8 036 18 2 19.8 030 19 6 10.9 NOT SIGNALIZED 13 4 0.49 14 3 190 049 186 Page 16 Page 49 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING TABLE SEVEN· AITTRNOON PEAK HOUR INTERSECTION VOLUME·TO·CAPACITY RATIOS ANO AVERAGE TOTAL DELAY IN SECONDS PER VEHICLE JULY 2025 ANO COMPARABLE 2024, 2020, ANO 2015 FIGURES 2025 2024 Intersection vie dpv vie dpv Wm Hilton Parkway wrth Crosstree Dnve/C Heinnchs Circle 089 9 1 NOTCOUWTED Wm Hilton Parkway wnh Squire Pope Road/Chamberlin Dnve 1 .01 62.6 0.99 47 6 Wm Hilton Parkway with Spanish Wells/Wdd Horse Roads 066 276 065 229 Wm Hilton Parkway with Gum Tree Road/Cross-Island Parkway Ramps 0 72 480 069 534 Wm Hilton Parkway with Wilborn Road/Jarvis Park Dnve 0 71 14 8 0 70 12 5 Wm Hdton Parkway wnh Pembroke Dnve/r..luseum Street 066 24 5 065 21 7 Wm Hdton Park\vay with Whooping Crane Way/Indigo Run Dnve 0 70 21 3 0 70 198 Wm Hilton Park\vay with Beach Cny Road/Gardner Dnve 062 16 8 063 23 9 Wm Hilton Park\vay with Mathews Onve (northern 1ntersecuon) 058 289 063 339 Wm Hilton Park\vay with Dillon Road/Plaza Dnve 063 19 1 062 20 7 Wm Hilton Park\vay with Coggins Pomt Road 056 14 3 056 14 5 Wm Hilton Park\vay wnh Beachwood Onve 0 42 22 0 41 1 8 Wm Hilton Park\vay \Vlth Folly Fteld Roadll.tathews Onve 057 33 1 063 33 1 Wm HIiton Park\vay wrth Singleton Beach Road 046 36 0 50 43 Wm Hilton Park\vay wnh Shelter Cove Lane (off-island Intersect,on) 0 46 38 050 4 7 Wm Hilton Parkway wnh Shelter Cove Lane (center 1ntersect10n) 045 14 6 0 49 15 9 Wm Hilton Parkway with Queens Folly Road/King Neptune Way 0 51 304 055 31 7 Wm HIiton Parkway with Queens Way 040 48 0 47 60 Wm Hilton Park\vay with Shipyard/Wexford Onves 050 202 055 230 Wm Hilton Park\vay with New Orleans RoadNdlage at Wexford 0 59 226 065 228 Wm Hilton Park\vay wnh Arrow Road 049 34 3 056 43 6 Pope Avenue wrth New Orleans/Office Park Roads 057 309 063 336 Pope Avenue with Corddlo Park\vay 0 50 309 049 331 Pope Avenue with Lagoon RoadtBeach Parking Lot 0 40 231 0 39 23 4 Palmetto Bay Road with Target Road/Island Crossings Shoppmg Ctr 054 239 0 58 24 9 Palmetto Bay Road with Arrow/Point Comfort Roads 0 74 25 7 0 76 28 4 v i e • lnte~ecuon V01ume - t0-Capac1ty Rauo dpv • Average Total Delay-per-verncle In secono.s NO TE Operational con(Nt0ns t;;,rtmg to comply 111111 goa1s ser tonn 111 me LMO are snown in 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportu nity Employer 2020 2015 vie dpv vie dpv NOT SIGNAUZED 1.13 79.9 1.10 58.5 0 75 234 0 79 252 0 72 34 7 088 26 1 070 10 3 0 75 64 067 200 073 262 0 75 18 6 082 19 4 0 72 24 2 0 71 12 2 066 206 068 28 8 066 12 7 067 14 1 0 61 10 4 059 16 7 050 1 8 048 1 8 065 26 9 065 26 3 055 38 0 46 40 054 46 NOT SIGNAUZED 055 12 3 064 160 067 28 7 0 81 44 7 066 72 056 77 064 21 4 056 15 4 064 170 0 57 27 8 046 28 8 0 48 22 3 057 238 062 296 053 24 9 061 24 1 050 31 8 NOT SIGNALIZED 0 51 22 4 0 59 23 5 066 26 7 072 26 1 Page 17 Page 50 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING As shown in Table Six on page 16, all signalized intersections within the Town were found to be fully compliant with the dual LMO operational goals for signalized intersections and operate at level of service (LOS) D or better during the morning peak volume hour in July 2025, although the intersection of Wm. Hilton Parkway with Gum Tree Road was close to being non-compliant based on an average total delay per vehicle of 53.3 seconds, the highest average delay at any signalized intersection. Table Seven on page 17 shows that the intersection of William Hilton Parkway with Squire Pope Road and Chamberlin Drive was the only signalized intersection analyzed as failing to meet the Town's operational goals during the afternoon peak volume hour in July 2025, based on an intersection volume-to-capacity ratio of 1.01 and an average total delay per vehicle of 62.6 seconds indicative of LOS E. A brief discussion of mitigation for these intersections follows below in Part Seven. PART S_EVEN - INTERSECTIONS OPERA TING OUT OF COMPLIANCE WITH TOWN OPERATIONAL GOALS IN JULY 2025 WILLIAM HILTON PARKWAY WITH SQUIRE POPE ROAD AND CHAMBERLIN DRIVE The intersection of William Hilton Parkway with Squire Pope Road and Chamberlin Drive was found to be non-compliant with the maximum intersection volume-to-capacity ratio LMO goal during the afternoon peak volume hour based on an intersection volume-to-capacity ratio of 1.01, indicative of demand that slightly exceeds the theoretical capacity of the intersection, and an average total delay-per-vehicle of 62.6 seconds per vehicle. These non-compliant figures for the afternoon peak hour stem from the fact that the intersection has three lanes available to serve through traffic in the eastbound direction, but only two westbound. There is also very heavy demand on the southbound right turn from Squire Pope Road that is served by a single lane and a YIELD condition, and the eastbound left turn onto Squire Pope Road that is served by a single lane and signalized. The eastbound left turn is served by protected-permitted left-turn phasing, meaning that the eastbound left turn is periodically served with a green left-turn arrow and other times by a flashing yellow arrow that allows motorists to turn left when an adequate gap in westbound traffic presents. Due to the constrained westbound through flow and availability of only two lanes, the protected left-turn green signal must be turned on for an interval that is as short as practical, and the permitted flashing yellow arrow portion of the phase affords virtually no adequate gaps in opposing traffic to turn left. The lack of gaps in westbound traffic flow also generates inordinately long vehicle queues originating from the YIELD sign serving right-turning motorists on Squire Pope Road, as the necessarily short green times provided to the side streets and green arrow serving eastbound left turns are insufficient to serve the 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunity Employer 18 Page 51 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING demand that may reach 16 vehicles or more per signal change. The Town has retained a design consultant to make recommendations regarding the mitigation of this intersection that has conducted a great deal of analysis on the intersection and recommended a "scissors"-style, or "continuous green T" intersection as an improvement that would eliminate the signal control presently afforded to low­ volume Chamberlin Drive in favor of a STOP sign and limit this street to right-in/right­ out ingress and egress. It is not this report's intention to duplicate or compare analysis with the considerable analysis and associated recommendation proffered by the consultant. But some alternate improvements that have been or are being considered for this intersection were analyzed to measure their impact on operations and their associated ability to mitigate the intersection relative to compliance with the Town's operational goals, and these will be discussed. The intersection was assessed by eliminating the YIELD condition serving right turns from Squire Pope Road and adding a second right-turn lane, with right turns controlled by the traffic signal. This improvement resulted in an intersection volume-to­ capacity ration of 0.94, still non-compliant with the LMO goals. Providing a free-flowing southbound right-turn via the construction of an adequately-designed acceleration lane departing the intersection westbound successfully mitigated the intersection, but it is recognized that this treatment has a significant impact on private property that is highly undesirable. The provision of a second left-turn lane to serve eastbound turns onto Squire Pope Road was assessed, but this improvement resulted in a still non-compliant intersection with a volume-to-capacity ratio of 0.92, even when combined with the aforementioned second right-turn lane added to Squire Pope Road's approach to the signal. The provision of a future third westbound through lane without any other improvements successfully mitigated the signal, however, resulting in a projected total delay of 15.5 seconds per vehicle during the afternoon peak hour and reducing the intersection's volume-to-capacity ratio to 0.82. It appears that, barring an improvement that either provides a free-flowing right turn from Squire Pope Road or one that grade separates the eastbound left turn onto Squire Pope Road and conveys it over the westbound through movement to a new intersection on Squire Pope Road, widening to provide a third westbound through lane through the intersection is the key to the long­ term successful mitigation of this intersection and its operation in compliance with the LMO goals during the afternoon peak hour. WILLIAM HILTON PARKWAY WITH GUM TREE ROAD AND CROSS ISLAND PARKWAY ON/OFF RAMPS While this intersection was found to be operating in compliance with the LMO operational goals in July 2025, the average total delay of 53.3 seconds per vehicle 181 Bluffto n Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www .ice-eng.com An Equal Opportunity Employer 19 Page 52 of 138 ]EINFRASTRUCTURE I CONSULTING & ENGINEERING shown in Table Six indicated that this congested intersection is very close to operating out of compliance with the LMO's delay-based goal during the morning peak volume hour. Additional analysis was conducted to develop an intersection improvement recommendation that may render this intersection reliably compliant with the LMO goals for several years into the future, particularly as traffic demands increase as a result of nearby residential development that is under construction at the time of this report. It has often been suggested that the third eastbound through lane that previously existed at this intersection until circa 2010 should be restored. Analysis shows that this improvement in itself would not successfully mitigate the intersection unless the free-flowing right-turn lane serving northbound motorists exiting the Cross Island Parkway is maintained. At up to 400 vehicles per hour, the demand on this right­ turn is even higher than that on the right turn from Squire Pope Road, and analysis of efforts to replace the existing free-flowing right turn with two right-turn lanes controlled by the signal do not successfully mitigate the intersection. Conversely, the provision of a second left-turn lane to serve each direction of William Hilton Parkway does successfully mitigate the intersection, with the raised, landscaped channelizing island in the intersection's southwest (Honey Horn) quadrant eliminated to accommodate two departure lanes southbound and the channelizing island in the southeast (Jarvis Park) quadrant retained to maintain the free-flowing northbound right turn. Notably, the elimination of the channelizing island in the southwest quadrant would remediate a channelized right-turn lane that was not designed to accommodate heavy vehicles, and also enable the existing southbound right-turn lane on Gum Tree Road to be revised to a shared through/right lane as was previously the case prior to approximately 2010. While this would adversely impact the right-turn movement, particularly the ability to turn right on a red signal from Gum Tree Road, the availability of two through lanes to proceed onto the on ramp to the Cross Island Parkway from Gum Tree Road increases the intersection's capacity and may reduce the length of green signal required to keep Gum Tree Road from backing up into the Marsh Point Drive intersection that is likely to experience increased demand in the near future. OTHER INTERSECTIONS WITH POTENTIAL LMO COMPLIANCE ISSUES BASED ON OPERATIONAL GOALS REVISED BY TOWN COUNCIL IN AUGUST 2025 As referenced herein, Town Council modified the operational goals outlined in Section 16-5-106. C of the LMO by enacting ordinance 2025-18 last August. This ordinance added two additional goals to the longstanding capacity- and delay-based operational goals described in this section. The two operational goals that were added read as shown at the top of the following page in the LMO: 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunlt)I Employer 20 Page 53 of 138 ][INFRASTRUCTURE CONSULTING & ENGINEERING 4. The Level of Service (LOS) for any vehicular traffic movement does not decline by more than one level per the requirement s of the Highway Capacity Manual (HCM), nor to a Level of Service of "F"; and 5. The development causes safety issues or delays that require mitigation as determined by the Town Engineer. While the second of the two added operational goals is subjective and may be applied at the discretion of the Town Engineer, the first addresses the level-of-service (LOS) associated with individual traffic movements as assessed by the analyses conducted for this report. Although these goals may have been added to the LMO by Town Council to provide the Town with additional options to require mitigation by development applicants, this report acknowledges the inclusion of 4. above in Section 16-5-106(C) relating to declines in LOS for individual traffic movements. This recently-established goal requires that the LOS associated with any individual traffic movement does not decline by more than one LOS, nor to LOS F, associated with an average total delay per vehic le exceeding 80.0 seconds at signalized intersections or 50.0 seconds on roundabout approaches. This goal makes no distinction between conventional signalized intersections and roundabouts in the LMO, and is applicable to intersections in general. Four instances of the LOS associated with an individual traffic movement declining by more than one level (letter grade), one each at four different intersections , in July 2025 compared with July 2024, were identified. Three of these declines in LOS occurred during the afternoon peak hour and one, at Sea Pines Circle, occurred during the morning peak hour. These four movements and the change in their average total delay score are shown in Table Eight on page 22. 181 Bluffton Road, Suite C-102 I Bluffto n, SC 29910 I 843-485-356 0 (P) I www.ice-eng.com An Equal Opp-0rtunlty Employer 21 Page 54 of 138 ][INFRASTRUCTURE CONSUL TING & ENGINEERING TABLE EIGHT-INDIVIDUAL TRAFFIC MOVEMENTS DECLINING BY MORE THAN ONE LEVEL OF SERVICE - JULY 2024 TO JULY 2025 AM/PM 2024 2025 Intersection Movement Peak Hour dpv LOS dpv Wm. Hilton Pkwy. Eastbound Left Turn w/ Squire Pope Rd from Wm. Hilton PM 10.8 B 46.8 I Chamberlin Dr Pkwv. Wm. Hilton Pkwy. Eastbound Wm. w/ Gum Tree Hilton Pkwy. Through PM 19.9 B 35.9 Rd./XIP Ramps Pope Avenue w/ Southbound Right Turn onto Cardillo PM 8.8 A 20.5 Cardillo Parkway Pkwv. Wm. Hilton Pkwy. Sea Pines Circle Entering Circulating AM 24.2 C 41 .2 Roadway dpv - Average Total Delay per Vehicle in seconds LOS D D C E Eight intersections were analyzed as having one or more individual traffic movements that declined from LOS E to LOS F in July 2025 compared with July 2024, five during the afternoon peak hour, and three during the morning peak hour. These intersections and the individual traffic movements that declined to LOS F in July 2025 compared with July 2024 are shown in Table Nine on page 23. 181 Bluffton Road, Suite C-102 I Bluffton, SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunity Employer 22 Page 55 of 138 ]EINFRASTRUCTURE CONSULTING & ENGINEERING TABLE NINE - INDIVIDUAL TRAFFIC MOVEMENTS DECLINING FROM LOS E TO LOS F - JULY 2024 TO JULY 2025 AM/PM 2024 2025 Intersection Moveme nt Peak Hour dpv LOS dpv Northbound Left Turn AM 75.1 E 80.8 from Chamberlin Dr. Wm. Hilton Pkwy. Northbound Through w/ Squire Pope Rd AM 75.5 E 80.9 / Chamberlin Dr from Chamberlin Dr. Southbound Left Turn AM 78.8 E 83.9 from Squire Pope Rd. Wm. Hilton Pkwy. Northbound Left Turn w/ Spanish Wells / from Spanish Wells AM 77.8 E 86.8 Wild Horse Rds. Rd. Wm Hilton Pkwy. Eastbound Left Turn w/ Beach City from Wm. Hilton PM 79.2 E 87.4 Rd./Gardner Dr. Pkwy. Wm. Hilton Pkwy. Northbound Left Turn w/ Dillon from Plaza Dr. PM 78.5 E 80.3 Rd./Plaza Dr. Wm. Hilton Pkwy. Southbound Left Turn PM 75.3 E 88.4 w/ Arrow Rd. from Arrow Rd. Pope Ave. w/ New Westbound Left Turn Orleans/Office from New Orleans PM 75.4 E 81.4 Park Rds. Rd. Pope Ave. w/ Westbound Right Turn from Gordillo PM 69.6 E 80.2 Cordillo Pkwy. Pkwv. Sea Pines Circle Southbound Palmetto AM 49.2 E 68.7 Bay Road Approach dpv - Average Total Delay per Vehicle in seconds LOS F F F F F F F F F F It should be noted that optimal and efficient peak hour traffic signal operation that reduces the frequency of signal changes sufficiently to afford adequate capacity to arterial through or other high-volume traffic movements routinely results in red signals provided to low-volume , minor traffic movements that may approach or even 181 Bluffton Road, Suite C-102 I Bluffton , SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunity Employer 23 Page 56 of 138 1 INFRASTRUCTURE iCONSULTING & ENGINEERING exceed two minutes. If the resulting average total delay per vehicle for any individual traffic movements exceed 80.0 seconds at a signalized intersection, the movement is evaluated as operating at LOS F. Hence, it may be very difficult and somewhat impractical to operate traffic signals in a manner that avoids any traffic movements operating at LOS F. The inclusion of this goal addressing individual traffic movements in the LMO serves as a useful tool for identifying specific concerns relating to development applications rather than to identify large numbers of signalized intersections as being non-compliant based on low-demand traffic movements that necessarily experience relatively long delays at traffic signals during peak hours. PART EIGHT - PLANNING COMMISSION ACTION ON THIS REPORT AS OUTLINED IN THE LMO As of the date of this report, the LMO requires that the Planning Commission entertain and discuss this report at a public meeting that affords an opportunity for public comment. No explicit action on the part of the Planning Commission is cited. The LMO states that following the public meeting, the Planning Commission shall forward the report to Town Council, accompanied by their own comments and remarks on the report and its recommendations, if desired. The specific wording on action by the Planning Commission in response to this report as outlined in Section 16-2- 103(J)10.c of the online LMO as of the date of this report is shown on the following page for the Commission's ready reference. PLANNING COMMISSION ACTION ''The Transportation Monitoring and Evaluation Report prepared by the Town Engineer as described above shall be forwarded to the Planning Commission . Upon receipt of the Report and recommendations from the Town Engineer, the Planning Commission shall give notice and hold a public meeting for the purpose of discussing the Report and recommendations and eliciting public comme nts." "Following its review , the Planning Commission shall forward the Transp ortation Monitoring and Evaluation Report and recommendations , and may forward its own supplementa l report and recommendat ions , to the Town Council ." 181 Bluffton Road, Suite C-102 I Blufft on, SC 29910 I 843-485-3560 (P) I www.ice-eng.com An Equal Opportunity Employer 24 Page 57 of 138 ]EINFRASTRUCTURECONSULTING&ENGINEERING APPENDIXA JULY2025MORNINGANDAFTERNOONPEAK HOURTURNINGMOVEMENTCOUNTSOF SIGNALIZEDINTERSECTIONS ANDSEAPINESCIRCLE PageA-1 181BlufftonRoad,SuiteC-102]Bluffton,SC299101843-485-3560(P)]www.ice-eng.com AnEqualOpportunityEmployer Page 58 of 138 Signal Number 099 0 0 0 0 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 0 0 Ped Crosswalk 0 1310 0 0 Ped Crosswalk 19 2686 Bike Crosswalk 0 0 24 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 1036 Peak Hour Factor 0.99 Bike(Road) 0 46 0 18 0 Page A-2 n/a2024 Total Percent Change n/a Crosstree Drive On Island Off Island Intersection Total Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM William Hilton Parkway - Crosstree Drive/C Heinrichs Circle AM Peak Hour 7:15 AM to 8:15 AM Westbound William Hilton Parkway C Heinrichs Circle 0 2704 Eastbound William Hilton Parkway 1356 Tuesday July 8, 2025 0 2025 Total 1329 2710 4103 64 43 Page 59 of 138 Signal Number 099 0 2 0 2 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 2 0 Ped Crosswalk 0 2858 0 0 Ped Crosswalk 56 1871 Bike Crosswalk 0 3 24 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 1258 Peak Hour Factor 0.97 Bike(Road) 0 40 0 29 0 Page A-3 2 80 2024 Total Percent Change Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM 4887 n/a 69 Intersection Total 2025 Total Crosstree Drive C Heinrichs Circle William Hilton Parkway - Crosstree Drive/C Heinrichs Circle 4 2900 2919 1895 Eastbound William Hilton Parkway On Island Off Island Tuesday July 8, 2025 PM Peak Hour 4:45 PM to 5:45 PM Westbound William Hilton Parkway 1905n/a Page 60 of 138 Signal Number 100 0 203 0 43 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 42 0 Ped Crosswalk 0 1258 181 0 Ped Crosswalk 0 2493 Bike Crosswalk 0 0 1 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 1066 Peak Hour Factor 0.99 Bike(Road) 0 2 0 1 0 Page A-4 William Hilton Parkway - Squire Pope Road/Chamberlin Drive AM Peak Hour 7:30 AM to 8:30 AM Westbound William Hilton Parkway Squire Pope Road 223 2537 Eastbound William Hilton Parkway 1463 Tuesday July 8, 2025 1300 2675 On Island Off Island Intersection Total 4224 246 2025 Total 3 1 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 43102024 Total Percent Change -2.0% Chamberlin Drive Page 61 of 138 Signal Number 100 0 284 1 30 0 Bike(Road) Bike Crosswalk Ped Crosswalk r 0 0 Bike (Road) 0 Bike Crosswalk 39 0 Ped Crosswalk 0 2516 175 0 Ped Crosswalk 0 1786 Bike Crosswalk 0 3 34 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 1250 Peak Hour Factor 0.98 Bike(Road) 0 5 31 0 0 Page A-5 245 35 -2.8% William Hilton Parkway - Squire Pope Road/Chamberlin Drive 315 2805 2558 1995 Eastbound William Hilton Parkway On Island Off Island Tuesday July 8, 2025 PM Peak Hour 4:00 PM to 5:00 PM Westbound William Hilton Parkway 1819 2024 Total Percent Change Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM 4904 5047 36 Intersection Total 2025 Total Chamberlin Drive Squire Pope Road Page 62 of 138 0 10 50 87 0 Signal Number 101 Bike(Road) Bike Crosswalk Ped Crosswalk 0 1 Bike (Road) 0 Bike Crosswalk 24 3 Ped Crosswalk 0 1065 53 0 Ped Crosswalk 56 2255 Bike Crosswalk 0 1 127 0 2 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 1010 Peak Hour Factor 0.98 Bike(Road) 0 107 37 78 0 Page A-6 On Island Off Island Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 222 Spanish Wells Road William Hilton Parkway - Wild Horse Road/Spanish Wells Road AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Wild Horse Road 114 2421 Eastbound William Hilton Parkway 1185 Tuesday July 8, 2025 147 1146 2440 3956 4243 Intersection Total 2025 Total 2024 Total Percent Change -6.8% 233 Page 63 of 138 0 25 66 47 0 Signal Number 101 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 55 3 Ped Crosswalk 0 2201 58 0 Ped Crosswalk 19 1490 Bike Crosswalk 0 7 162 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 1171 Peak Hour Factor 0.94 Bike(Road) 0 180 43 29 0 Page A-7 On Island Off Island Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Westbound William Hilton Parkway 1573Percent Change -6.6% Spanish Wells Road Wild Horse Road William Hilton Parkway - Wild Horse Road/Spanish Wells Road 138 2409 2282 1713 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 5:00 PM to 6:00 PM 4385 4693 252 Intersection Total 2023 Total 2022 Total 156 247 Page 64 of 138 Signal Number 102 3 97 178 254 0 Bike(Road) Bike Crosswalk Ped Crosswalk 3 0 Bike (Road) 0 Bike Crosswalk 176 5 Ped Crosswalk 0 670 120 0 Ped Crosswalk 158 1357 Bike Crosswalk 0 1 27 3 0 Bike (Road) 0 2 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 863 Peak Hour Factor 0.97 Bike(Road) 0 5 84 213 0 Page A-8 302 363 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM William Hilton Parkway - Gum Tree Road/Cross Island Parkway Ramps AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Gum Tree Road 380 1825 Eastbound William Hilton Parkway 777 Tuesday July 8, 2025 532 1005 1509 3356 Cross Island Parkway On Island Off Island 3379 Intersection Total 2025 Total 2024 Total Percent Change -0.7% Page 65 of 138 Signal Number 102 0 119 123 228 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 1 Bike (Road) 0 Bike Crosswalk 447 0 Ped Crosswalk 0 1495 94 1 Ped Crosswalk 159 849 Bike Crosswalk 0 0 4 0 1 Bike (Road) 1 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 1131 Peak Hour Factor 0.97 Bike(Road) 0 261 231 363 0 Page A-9 Percent Change 3.0% Westbound William Hilton Parkway 1440 2024 Total Cross Island Parkway Gum Tree Road 772 286 William Hilton Parkway - Gum Tree Road/Cross Island Parkway Ramps 470 1875 2101 948 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM On Island Off Island 4377 4251 855 Intersection Total 2025 Total Page 66 of 138 0 27 2 10 0 Signal Number 103 Bike(Road) Bike Crosswalk Ped Crosswalk 4 2 Bike (Road) 1 Bike Crosswalk 11 5 Ped Crosswalk 0 953 42 0 Ped Crosswalk 8 1715 Bike Crosswalk 0 1 58 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 757 Peak Hour Factor 0.95 Bike(Road) 0 19 0 7 0 Page A-10 26 68 William Hilton Parkway - Wilborn Road/Jarvis Park Road AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Wilborn Road 53 1733 Eastbound William Hilton Parkway 1004 Tuesday July 8, 2025 39 974 1820 2865 Jarvis Park Road On Island Off Island Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 2956 Intersection Total 2025 Total 2024 Total Percent Change -3.1% Page 67 of 138 Signal Number 103 0 184 2 10 0 Bike(Road) Bike Crosswalk Ped Crosswalk 3 2 Bike (Road) 3 Bike Crosswalk 18 76 Ped Crosswalk 0 1837 59 0 Ped Crosswalk 1 1269 Bike Crosswalk 2 8 53 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 942 Peak Hour Factor 0.95 Bike(Road) 0 63 2 3 0 Page A-11 Percent Change 0.7% Westbound William Hilton Parkway 1290 2025 Total 2024 Total Jarvis Park Road Wilborn Road 79 56 William Hilton Parkway - Wilborn Road/Jarvis Park Road 196 2160 1867 1457 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM On Island Off Island 3595 3570 68 Intersection Total Page 68 of 138 Signal Number 104 1 22 9 12 0 Bike(Road) Bike Crosswalk Ped Crosswalk 2 1 Bike (Road) 0 Bike Crosswalk 5 8 Ped Crosswalk 0 780 41 1 Ped Crosswalk 33 1460 Bike Crosswalk 0 2 173 2 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 723 Peak Hour Factor 0.95 Bike(Road) 0 151 6 47 0 Page A-12 2894 Intersection Total 2025 Total 2024 Total Percent Change -4.8% 215 William Hilton Parkway - Pembroke Drive/Museum Street AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Museum Street 52 1521 Eastbound William Hilton Parkway 961 Tuesday July 8, 2025 44 820 1682 2756 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM On Island Off Island 204 Pembroke Drive Page 69 of 138 Signal Number 104 0 40 17 10 0 Bike(Road) Bike Crosswalk Ped Crosswalk 5 4 Bike (Road) 0 Bike Crosswalk 21 2 Ped Crosswalk 0 1519 49 0 Ped Crosswalk 33 1058 Bike Crosswalk 3 4 211 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 889 Peak Hour Factor 0.96 Bike(Road) 0 387 16 42 0 Page A-13 3421 3430 445 Intersection Total 2025 Total 2024 Total 86 261 William Hilton Parkway - Pembroke Drive/Museum Street 67 1948 1577 1320 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 4:15 PM to 5:15 PM Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM On Island Off Island Westbound William Hilton Parkway 1114Percent Change -0.3% Pembroke Drive Museum Street Page 70 of 138 Signal Number 105 0 116 85 257 1 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 235 22 Ped Crosswalk 0 876 154 0 Ped Crosswalk 38 1163 Bike Crosswalk 0 7 50 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 846 Peak Hour Factor 0.94 Bike(Road) 0 53 74 42 2 Page A-14 On Island Off Island 171 Indigo Run Drive William Hilton Parkway - Whooping Crane Way/Indigo Run Drive AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Whooping Crane Way 464 1469 Eastbound William Hilton Parkway 1067 Tuesday July 8, 2025 459 1156 1389 3175 3058 Intersection Total 2025 Total 2024 Total Percent Change 3.8% 173 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM Page 71 of 138 Signal Number 105 0 85 61 235 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 325 25 Ped Crosswalk 0 1376 125 0 Ped Crosswalk 23 967 Bike Crosswalk 0 2 42 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 968 Peak Hour Factor 0.89 Bike(Road) 1 62 88 32 1 Page A-15 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM On Island Off Island 1236Percent Change -10.3% Indigo Run Drive Whooping Crane Way 538 127 William Hilton Parkway - Whooping Crane Way/Indigo Run Drive 381 1548 1726 1159 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 4:00 PM to 5:00 PM 3450 3845 184 Intersection Total 2025 Total 2024 Total Westbound William Hilton Parkway Page 72 of 138 Signal Number 106 0 208 25 62 0 113 Bike(Road) Bike Crosswalk Ped Crosswalk 2 7 Bike (Road) 0 Bike Crosswalk 111 1 Ped Crosswalk 1 789 226 0 Ped Crosswalk 19 1196 Bike Crosswalk 1 0 9 0 0 Bike (Road) 0 1 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 751 Peak Hour Factor 0.93 Bike(Road) 0 16 49 57 0 Page A-16 53 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM Gardner Drive William Hilton Parkway - Beach City Road/Gardner Drive AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Beach City Road 386 1315 Eastbound William Hilton Parkway 1014 Tuesday July 8, 2025 295 27802025 Total 2024 Total 122 On Island Off Island Intersection Total 919 1432 2963 Percent Change -6.2% Page 73 of 138 Signal Number 106 0 357 42 75 0 Bike(Road) Bike Crosswalk Ped Crosswalk 8 0 Bike (Road) 0 Bike Crosswalk 54 1 Ped Crosswalk 1 1463 170 0 Ped Crosswalk 44 1052 Bike Crosswalk 0 2 16 0 0 Bike (Road) 0 1 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 893 Peak Hour Factor 0.94 Bike(Road) 0 7 20 44 0 Page A-17 71 Intersection Total 3512 Gardner Drive Beach City Road 244 102 William Hilton Parkway - Beach City Road/Gardner Drive 474 1828 1563 1239 3357 Tuesday July 8, 2025 PM Peak Hour 4:15 PM to 5:15 PM Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Eastbound William Hilton Parkway Percent Change -4.4% Westbound William Hilton Parkway 1173 2025 Total 2024 Total On Island Off Island Page 74 of 138 Signal Number 161 0 45 1123 99 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 38 0 Ped Crosswalk 5 29 48 0 Ped Crosswalk 61 28 Bike Crosswalk 2 0 57 0 0 Bike (Road) 11 3 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 645 Peak Hour Factor 0.90 Bike(Road) 3 80 643 40 0 Page A-52 1244 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 766 Palmetto Bay Road Palmetto Bay Road - Target Road/Island Crossings Shopping Center AM Peak Hour 8:00 AM to 9:00 AM Target Road Palmetto Bay Road 729 167 Island Crossings Shopping Center 154 Tuesday July 8, 2025 1267 23152025 Total 2024 Total Sea Pines Circle Off Island Intersection Total 128 133 2380 Percent Change -2.7% Page 75 of 138 Signal Number 161 0 51 964 37 0 Bike(Road) Bike Crosswalk Ped Crosswalk 1 0 Bike (Road) 0 Bike Crosswalk 105 0 Ped Crosswalk 2 57 145 0 Ped Crosswalk 59 43 Bike Crosswalk 0 0 97 0 0 Bike (Road) 4 4 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 772 Peak Hour Factor 0.96 Bike(Road) 7 104 1262 24 0 Page A-53 2964 Off Island Palmetto Bay Road 1512 Palmetto Bay Road - Target Road/Island Crossings Shopping Center 1052 212 221 285 2966 Tuesday July 8, 2025 PM Peak Hour 4:00 PM to 5:00 PM Sea Pines Circle Intersection Total Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Island Crossings Shopping Center Percent Change 0.1% Target Road 104 2025 Total 2024 Total Palmetto Bay Road 1397 1127 Page 76 of 138 Signal Number 162 2 57 1159 225 1 Bike(Road) Bike Crosswalk Ped Crosswalk 2 0 Bike (Road) 0 Bike Crosswalk 125 1 Ped Crosswalk 3 16 90 0 Ped Crosswalk 36 27 Bike Crosswalk 0 0 96 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 704 Peak Hour Factor 0.91 Bike(Road) 1 33 642 39 0 Page A-54 Sea Pines Circle Off Island Intersection Total 177 214 2711 Percent Change -5.8% 1444 25552025 Total 2024 Total Palmetto Bay Road - Arrow Road/Point Comfort Road AM Peak Hour 8:00 AM to 9:00 AM Arrow Road Palmetto Bay Road 858 291 Point Comfort Road 107 Tuesday July 8, 2025 1292 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 715 Palmetto Bay Road Page 77 of 138 Signal Number 162 0 75 963 145 2 Bike(Road) Bike Crosswalk Ped Crosswalk 4 2 Bike (Road) 0 Bike Crosswalk 313 0 Ped Crosswalk 2 34 71 0 Ped Crosswalk 42 28 Bike Crosswalk 0 0 68 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 876 Peak Hour Factor 0.93 Bike(Road) 1 89 1369 65 0 Page A-55 1524 1074 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Point Comfort Road Percent Change -1.6% Arrow Road 238 2025 Total 2024 Total Palmetto Bay Road Tuesday July 8, 2025 PM Peak Hour 4:00 PM to 5:00 PM Sea Pines Circle Intersection Total 3327 Off Island Palmetto Bay Road 1755 Palmetto Bay Road - Arrow Road/Point Comfort Road 1185 198 389 167 3273 Page 78 of 138 Signal Number 201 0 48 110 151 0 Bike(Road) Bike Crosswalk Ped Crosswalk 11 0 Bike (Road) 0 Bike Crosswalk 87 2 Ped Crosswalk 4 656 67 0 Ped Crosswalk 62 820 Bike Crosswalk 1 7 233 9 0 Bike (Road) 2 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 704 Peak Hour Factor 0.92 Bike(Road) 0 141 82 93 0 Page A-18 Intersection Total 2025 Total 2024 Total Percent Change 1.4% 405 Note: LMO States AM Peak Hour Will Be Between 7 AM -9 AM 2586 William Hilton Parkway - Mathews Drive (northern intersection) AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Mathews Drive 236 1071 Eastbound William Hilton Parkway 847 Tuesday July 8, 2025 309 812 1122 2550 On Island Off Island 316 Mathews Drive Page 79 of 138 Signal Number 201 1 68 130 166 0 Bike(Road) Bike Crosswalk Ped Crosswalk 2 0 Bike (Road) 0 Bike Crosswalk 188 6 Ped Crosswalk 6 1162 44 2 Ped Crosswalk 81 761 Bike Crosswalk 1 1 275 7 0 Bike (Road) 2 2 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 881 Peak Hour Factor 0.95 Bike(Road) 0 265 118 63 0 Page A-19 446 Intersection Total 2025 Total 2024 Total Westbound William Hilton Parkway 991 William Hilton Parkway - Mathews Drive (northern intersection) 365 1501 1432 1086 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 4:15 PM to 5:15 PM On Island Off Island Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Percent Change -3.5% 3351 3473 Mathews Drive Mathews Drive 350 486 Page 80 of 138 Signal Number 202 0 152 29 72 0 Bike(Road) Bike Crosswalk Ped Crosswalk 15 2 Bike (Road) 0 Bike Crosswalk 59 4 Ped Crosswalk 1 642 137 5 Ped Crosswalk 66 902 Bike Crosswalk 0 0 72 1 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 644 Peak Hour Factor 0.87 Bike(Road) 0 30 11 53 0 Page A-20 On Island Off Island 94 Plaza Drive William Hilton Parkway - Dillon Road/Plaza Drive AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Dillon Road 207 1027 Eastbound William Hilton Parkway 828 Tuesday July 8, 2025 253 767 1115 2161 Intersection Total 2025 Total 2024 Total Percent Change 4.3% 167 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 2253 Page 81 of 138 Signal Number 202 0 189 34 80 0 Bike(Road) Bike Crosswalk Ped Crosswalk 8 1 Bike (Road) 0 Bike Crosswalk 63 5 Ped Crosswalk 0 1232 152 2 Ped Crosswalk 102 764 Bike Crosswalk 0 1 74 1 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 752 Peak Hour Factor 0.95 Bike(Road) 0 56 27 62 0 Page A-21 Off Island Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Percent Change -3.6% 2853 2959 Plaza Drive Dillon Road 242 210 William Hilton Parkway - Dillon Road/Plaza Drive 303 1482 1398 995 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 4:15 PM to 5:15 PM On Island 145 Intersection Total 2025 Total 2024 Total Westbound William Hilton Parkway 907 Page 82 of 138 Signal Number 203 3 137 64 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 52 0 Ped Crosswalk 0 611 197 0 Ped Crosswalk 837 Bike Crosswalk 0 0 0 0 Bike (Road) Highest 15 Min. Volume 535 Peak Hour Factor 0.89 Page A-22 On Island Off Island William Hilton Parkway - Coggins Point Road AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Coggins Point Road 52 837 Eastbound William Hilton Parkway 748 Tuesday July 8, 2025 204 663 1034 1831 Intersection Total 2025 Total 2024 Total Percent Change 3.8% Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 1901 Page 83 of 138 Signal Number 203 4 233 87 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 80 1 Ped Crosswalk 0 1186 187 0 Ped Crosswalk 756 Bike Crosswalk 0 0 0 0 Bike (Road) Highest 15 Min. Volume 671 Peak Hour Factor 0.94 Page A-23 On Island Off Island Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Percent Change -2.7% 2534 2603 Coggins Point Road 80 William Hilton Parkway - Coggins Point Road 324 1420 1266 944 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 4:15 PM to 5:15 PM Intersection Total 2025 Total 2024 Total Westbound William Hilton Parkway 756 Page 84 of 138 Signal Number 204 3 4 0 4 0 Bike(Road) Bike Crosswalk Ped Crosswalk 16 8 Bike (Road) 0 Bike Crosswalk 3 2 Ped Crosswalk 0 647 6 0 Ped Crosswalk 2 864 Bike Crosswalk 0 0 35 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 443 Peak Hour Factor 0.91 Bike(Road) 0 10 0 3 0 Page A-24 On Island Off Island 13 Beachwood Drive William Hilton Parkway - Beachwood Drive AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Beachwood Drive 9 871 Eastbound William Hilton Parkway 663 Tuesday July 8, 2025 11 652 907 1621 Intersection Total 2025 Total 2024 Total Percent Change -0.9% 37 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 1607 Page 85 of 138 Signal Number 204 0 8 0 4 0 Bike(Road) Bike Crosswalk Ped Crosswalk 15 0 d Bike (Road) 0 Bike Crosswalk 5 4 Ped Crosswalk 0 1212 2 0 Ped Crosswalk 3 824 Bike Crosswalk 0 0 11 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 550 Peak Hour Factor 0.96 Bike(Road) 0 20 0 4 0 Page A-25 Off Island Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Percent Change -5.2% 2112 2229 Beachwood Drive Beachwood Drive 7 14 William Hilton Parkway - Beachwood Drive 12 1244 1220 841 Eastbound William Hilton Parkway Tuesday July 8, 2025 PM Peak Hour 4:15 PM to 5:15 PM On Island 24 Intersection Total 2025 Total 2024 Total Westbound William Hilton Parkway 832 Page 86 of 138 Signal Number 205 3 40 48 95 0 Bike(Road) Bike Crosswalk Ped Crosswalk 3 23 Bike (Road) 0 Bike Crosswalk 60 0 Ped Crosswalk 12 548 56 4 Ped Crosswalk 156 791 Bike Crosswalk 2 1 27 2 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 685 Peak Hour Factor 0.87 Bike(Road) 0 29 61 410 0 Page A-26 On Island Off Island Intersection Total 765 874 2413 Percent Change -1.7% William Hilton Parkway - Folly Field Road / Mathews Drive AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Folly Field Road 177 1297 Eastbound William Hilton Parkway 617 Tuesday July 8, 2025 186 23712025 Total 2024 Total Mathews Drive 231 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 500 Page 87 of 138 Signal Number 205 0 91 57 167 0 148 Bike(Road) Bike Crosswalk Ped Crosswalk 7 5 Bike (Road) 1 Bike Crosswalk 111 0 Ped Crosswalk 12 1106 86 0 Ped Crosswalk 307 707 Bike Crosswalk 0 0 45 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 825 Peak Hour Factor 0.95 Bike(Road) 0 17 70 355 0 Page A-27 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Eastbound William Hilton Parkway Percent Change -5.1% Westbound William Hilton Parkway 1229 2025 Total 2024 Total Mathews Drive Folly Field Road 267 409 William Hilton Parkway - Folly Field Road / Mathews Drive 315 1214 1525 838 3144 Tuesday July 8, 2025 PM Peak Hour 4:15 PM to 5:15 PM On Island 442 Intersection Total 3314 Off Island Page 88 of 138 Signal Number 206 0 26 30 0 Bike(Road) Bike Crosswalk Ped Crosswalk 39 17 Bike (Road) 1 Bike Crosswalk 7 0 Ped Crosswalk 0 712 31 2 Ped Crosswalk 1181 Bike Crosswalk 0 0 2 0 Bike (Road) Highest 15 Min. Volume 582 Peak Hour Factor 0.88 Page A-28 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM William Hilton Parkway - Singleton Beach Road AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Singleton Beach Road 9 1181 Eastbound William Hilton Parkway 738 Tuesday July 8, 2025 56 20482025 Total 2024 Total On Island Off Island Intersection Total 720 1212 2016 Percent Change 1.6% Page 89 of 138 Signal Number 206 0 33 33 0 Bike(Road) Bike Crosswalk Ped Crosswalk 51 2 Bike (Road) 0 Bike Crosswalk 24 1 Ped Crosswalk 0 1407 23 0 Ped Crosswalk 1228 Bike Crosswalk 0 0 3 0 Bike (Road) Highest 15 Min. Volume 721 Peak Hour Factor 0.97 Page A-29 2863 On Island Singleton Beach Road 24 William Hilton Parkway - Singleton Beach Road 66 1441 1431 1252 2805 Tuesday July 8, 2025 PM Peak Hour 4:00 PM to 5:00 PM Off Island Intersection Total Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Eastbound William Hilton Parkway Percent Change -2.0% Westbound William Hilton Parkway 1228 2025 Total 2024 Total Page 90 of 138 Signal Number 243 23 123 Bike Crosswalk Ped Crosswalk Bike (Road) 2 183 186 0 Bike (Road) Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 180 Peak Hour Factor 0.83 Bike(Road) 55 28 0 Page A-50 146 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 83 Beach Side South Forest Beach Drive - Coligny Beach Park Pedestrian Crossing AM Peak Hour 8:00 AM to 9:00 AM South Forest Beach Drive Parking Lot Side 83 309 South Forest Beach Drive 238 Tuesday July 8, 2025 146 6002025 Total 2024 Total Sea Pines Ocean Gate Coligny Circle Intersection Total 185 186 645 Percent Change -7.0% Page 91 of 138 Signal Number 243 41 168 Bike Crosswalk Ped Crosswalk Bike (Road) 0 254 381 0 Bike (Road) Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 316 Peak Hour Factor 0.89 Bike(Road) 248 27 0 Page A-51 1107 Coligny Circle Parking Lot Side 275 South Forest Beach Drive - Coligny Beach Park Pedestrian Crossing 209 502 254 381 1119 Tuesday July 8, 2025 PM Peak Hour 4:45 PM to 5:45 PM Sea Pines Ocean Gate Intersection Total Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM South Forest Beach Drive Percent Change 1.1% South Forest Beach Drive 549 2025 Total 2024 Total Beach Side 275 209 Page 92 of 138 Signal Number 300 Bike (Road) 0 Bike Crosswalk 0 Ped Crosswalk 6 681 0 Ped Crosswalk 6 1167 Bike Crosswalk 2 0 54 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 561 Peak Hour Factor 0.87 Bike(Road) 0 37 5 0 Page A-30 1958 42 60 William Hilton Parkway - Shelter Cove Lane (off-island intersection near BCSO) AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway 1172 Eastbound William Hilton Parkway 718 Tuesday July 8, 2025 2025 Total 687 1221 On Island Off Island Intersection Total 19402024 Total Percent Change 0.9% Shelter Cove Lane Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM Page 93 of 138 Signal Number 300 Bike (Road) 0 Bike Crosswalk 0 Ped Crosswalk 5 1356 0 Ped Crosswalk 8 1212 Bike Crosswalk 2 0 56 0 0 Bike (Road) 1 4 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 700 Peak Hour Factor 0.97 Bike(Road) 0 74 3 0 Page A-31 William Hilton Parkway - Shelter Cove Lane (off-island intersection near BCSO) 1430 1364 1268 Eastbound William Hilton Parkway On Island Off Island Tuesday July 8, 2025 PM Peak Hour 4:00 PM to 5:00 PM Westbound William Hilton Parkway 1215 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM 2721 2776 77 Intersection Total 2025 Total Shelter Cove Lane -2.0% 64 2024 Total Percent Change Page 94 of 138 Signal Number 301 Bike (Road) 1 Bike Crosswalk 0 Ped Crosswalk 0 641 0 Ped Crosswalk 59 1036 Bike Crosswalk 0 1 109 0 0 Bike (Road) 0 1 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 546 Peak Hour Factor 0.91 Bike(Road) 0 74 56 0 Page A-32 1978 130 168 William Hilton Parkway - Shelter Cove Lane (central intersection near Hilton Head Tavern) AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway 1093 Eastbound William Hilton Parkway 715 Tuesday July 8, 2025 2025 Total 702 1145 On Island Off Island Intersection Total 19522024 Total Percent Change 1.3% Shelter Cove Lane Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM Page 95 of 138 Signal Number 301 Bike (Road) 0 Bike Crosswalk 0 Ped Crosswalk 3 1173 0 Ped Crosswalk 131 984 Bike Crosswalk 0 8 175 0 0 Bike (Road) 0 8 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 734 Peak Hour Factor 0.96 Bike(Road) 0 208 141 0 Page A-33 William Hilton Parkway - Shelter Cove Lane (central intersection near Hilton Head Tavern) 1381 1312 1159 Eastbound William Hilton Parkway On Island Off Island Tuesday July 8, 2025 PM Peak Hour 4:15 PM to 5:15 PM Westbound William Hilton Parkway 1133 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM 2831 2936 349 Intersection Total 2025 Total Shelter Cove Lane -3.6% 306 2024 Total Percent Change Page 96 of 138 Signal Number 302 23 217 20 156 1 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 169 26 Ped Crosswalk 0 503 199 0 Ped Crosswalk 19 775 Bike Crosswalk 0 7 62 2 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 662 Peak Hour Factor 0.86 Bike(Road) 0 37 25 24 0 Page A-34 101 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 86 King Neptune Way William Hilton Parkway - Queens Folly Road/King Neptune Way AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Queens Folly Road 394 962 Eastbound William Hilton Parkway 783 Tuesday July 8, 2025 417 22652025 Total 2024 Total On Island Off Island Intersection Total 698 1062 2307 Percent Change -1.8% Page 97 of 138 Signal Number 302 28 338 66 234 1 148 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 160 16 Ped Crosswalk 0 911 226 0 Ped Crosswalk 61 890 Bike Crosswalk 0 1 105 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 843 Peak Hour Factor 0.96 Bike(Road) 1 101 41 60 0 Page A-35 3407 Off Island Queens Folly Road 428 William Hilton Parkway - Queens Folly Road/King Neptune Way 667 1366 1133 1237 3240 Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM On Island Intersection Total Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Eastbound William Hilton Parkway Percent Change -4.9% Westbound William Hilton Parkway 1185 2025 Total 2024 Total King Neptune Way 203 233 Page 98 of 138 Signal Number 303 0 29 0 19 0 Bike(Road) Bike Crosswalk Ped Crosswalk 12 13 Bike (Road) 1 Bike Crosswalk 10 7 Ped Crosswalk 2 635 17 0 Ped Crosswalk 20 889 Bike Crosswalk 1 5 15 0 0 Bike (Road) 1 6 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 504 Peak Hour Factor 0.84 Bike(Road) 0 9 0 3 0 Page A-36 On Island Off Island Intersection Total 671 928 1711 Percent Change -1.0% William Hilton Parkway - Queens Way AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Queens Way 27 916 Eastbound William Hilton Parkway 680 Tuesday July 8, 2025 48 16942025 Total 2024 Total 35 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 12 Queens Way Page 99 of 138 Signal Number 303 0 13 0 12 0 148 Bike(Road) Bike Crosswalk Ped Crosswalk 18 0 Bike (Road) 0 Bike Crosswalk 14 6 Ped Crosswalk 2 1022 29 0 Ped Crosswalk 9 1039 Bike Crosswalk 0 4 14 0 0 Bike (Road) 2 18 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 618 Peak Hour Factor 0.90 Bike(Road) 0 30 3 1 0 Page A-37 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Eastbound William Hilton Parkway Percent Change -11.2% Westbound William Hilton Parkway 1056 2025 Total 2024 Total Queens Way 34 23 William Hilton Parkway - Queens Way 25 1071 1049 1088 2236 Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM On Island Intersection Total 2517 Off Island Queens Way 46 Page 100 of 138 Signal Number 401 0 88 19 84 1 148 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 62 0 Ped Crosswalk 0 1010 69 0 Ped Crosswalk 15 1027 Bike Crosswalk 0 0 147 1 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 711 Peak Hour Factor 0.93 Bike(Road) 0 96 15 23 0 Page A-39 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Eastbound William Hilton Parkway Percent Change -5.2% Westbound William Hilton Parkway 1134 2025 Total 2024 Total Wexford Drive 134 181 William Hilton Parkway - Shipyard Drive/Wexford Drive 192 1194 1087 1243 2657 Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM On Island Intersection Total 2802 Off Island Shipyard Drive 147 Page 101 of 138 Signal Number 402 0 95 3 3 0 Bike(Road) Bike Crosswalk Ped Crosswalk 8 6 Bike (Road) 0 Bike Crosswalk 15 0 Ped Crosswalk 5 537 129 0 Ped Crosswalk 11 696 Bike Crosswalk 0 4 16 1 1 Bike (Road) 0 3 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 445 Peak Hour Factor 0.87 Bike(Road) 0 8 5 9 0 Page A-40 On Island Off Island Intersection Total 567 842 1687 Percent Change -7.8% William Hilton Parkway - New Orleans Road/Village at Wexford AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway New Orleans Road 149 712 Eastbound William Hilton Parkway 640 Tuesday July 8, 2025 101 15552025 Total 2024 Total 30 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 22 Village at Wexford Page 102 of 138 Signal Number 402 0 324 11 16 0 Bike(Road) Bike Crosswalk Ped Crosswalk 16 1 Bike (Road) 0 Bike Crosswalk 22 1 Ped Crosswalk 5 723 235 0 Ped Crosswalk 16 845 Bike Crosswalk 0 6 47 0 0 Bike (Road) 0 5 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 630 Peak Hour Factor 0.92 Bike(Road) 0 19 7 23 0 Page B-41 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Eastbound William Hilton Parkway Percent Change -8.7% Westbound William Hilton Parkway 890 2025 Total 2024 Total Village at Wexford 49 74 William Hilton Parkway - New Orleans Road/Village at Wexford 351 1067 767 1128 2322 Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM On Island Intersection Total 2542 Off Island New Orleans Road 264 Page 103 of 138 Signal Number 403 3 18 37 23 1 Bike(Road) Bike Crosswalk Ped Crosswalk 8 2 Bike (Road) 0 Bike Crosswalk 33 0 Ped Crosswalk 3 434 52 1 Ped Crosswalk 40 547 Bike Crosswalk 3 0 121 4 1 Bike (Road) 0 1 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 471 Peak Hour Factor 0.84 Bike(Road) 0 140 85 23 3 Page A-42 198 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 251 Arrow Road William Hilton Parkway - Arrow Road AM Peak Hour 8:00 AM to 9:00 AM Westbound William Hilton Parkway Arrow Road 171 593 Eastbound William Hilton Parkway 592 Tuesday July 8, 2025 82 15832025 Total 2024 Total On Island Off Island Intersection Total 507 721 1598 Percent Change -0.9% Page 104 of 138 Signal Number 403 1 55 144 88 0 Bike(Road) Bike Crosswalk Ped Crosswalk 14 1 Bike (Road) 0 Bike Crosswalk 24 0 Ped Crosswalk 8 562 85 0 Ped Crosswalk 78 611 Bike Crosswalk 0 3 173 3 0 Bike (Road) 0 1 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 558 Peak Hour Factor 0.94 Bike(Road) 0 148 64 24 0 Page A-43 2319 Off Island Arrow Road 173 William Hilton Parkway - Arrow Road 288 765 667 869 2087 Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM On Island Intersection Total Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Eastbound William Hilton Parkway Percent Change -10.0% Westbound William Hilton Parkway 726 2025 Total 2024 Total Arrow Road 236 395 Page 105 of 138 Signal Number 501 0 13 728 41 5 Bike(Road) Bike Crosswalk Ped Crosswalk 8 1 Bike (Road) 3 Bike Crosswalk 28 0 Ped Crosswalk 8 24 12 8 Ped Crosswalk 131 21 Bike Crosswalk 3 0 69 12 0 Bike (Road) 2 12 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 606 Peak Hour Factor 0.77 Bike(Road) 2 54 547 129 2 Page A-44 Coligny Circle Sea Pines Circle Intersection Total 186 102 2012 Percent Change -7.4% Pope Avenue - New Orleans Road/Office Park Road AM Peak Hour 8:00 AM to 9:00 AM New Orleans Road Pope Avenue 592 191 Office Park Road 91 Tuesday July 8, 2025 787 18632025 Total 2024 Total 930 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 734 Pope Avenue Page 106 of 138 Signal Number 501 0 16 705 66 38 Bike(Road) Bike Crosswalk Ped Crosswalk 6 0 Bike (Road) 0 Bike Crosswalk 43 3 Ped Crosswalk 11 65 60 3 Ped Crosswalk 231 103 Bike Crosswalk 0 0 140 24 0 Bike (Road) 2 11 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 760 Peak Hour Factor 0.95 Bike(Road) 0 111 896 360 0 Page A-45 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Office Park Road Percent Change -6.6% New Orleans Road 529 2025 Total 2024 Total Pope Avenue 1367 1076 Pope Avenue - New Orleans Road/Office Park Road 825 195 339 306 2894 Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM Coligny Circle Intersection Total 3099 Sea Pines Circle Pope Avenue 1037 Page 107 of 138 Signal Number 502 0 353 451 36 0 Bike(Road) Bike Crosswalk Ped Crosswalk 24 3 Bike (Road) 0 Bike Crosswalk 39 0 Ped Crosswalk 40 13 282 27 Ped Crosswalk 28 11 Bike Crosswalk 11 0 14 30 1 Bike (Road) 5 1 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 540 Peak Hour Factor 0.81 Bike(Road) 1 14 349 27 0 Page A-46 Coligny Circle Sea Pines Circle Intersection Total 80 308 1784 Percent Change -1.3% Pope Avenue - Cordillo Parkway AM Peak Hour 8:00 AM to 9:00 AM Cordillo Parkway Pope Avenue 670 74 Cordillo Parkway 380 Tuesday July 8, 2025 840 17602025 Total 2024 Total 494 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 391 Pope Avenue Page 108 of 138 Signal Number 502 0 308 613 49 3 Bike(Road) Bike Crosswalk Ped Crosswalk 24 4 Bike (Road) 0 Bike Crosswalk 67 0 Ped Crosswalk 33 17 377 4 Ped Crosswalk 41 14 Bike Crosswalk 13 0 26 18 0 Bike (Road) 0 2 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 665 Peak Hour Factor 0.95 Bike(Road) 6 29 835 34 0 Page A-47 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Cordillo Parkway Percent Change -2.3% Cordillo Parkway 97 2025 Total 2024 Total Pope Avenue 904 686 Pope Avenue - Cordillo Parkway 973 354 125 417 2517 Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM Coligny Circle Intersection Total 2577 Sea Pines Circle Pope Avenue 1282 Page 109 of 138 Signal Number 503 2 32 278 86 8 Bike(Road) Bike Crosswalk Ped Crosswalk 28 33 Bike (Road) 1 Bike Crosswalk 59 0 Ped Crosswalk 43 3 14 48 Ped Crosswalk 11 2 Bike Crosswalk 70 0 7 49 1 Bike (Road) 5 17 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 339 Peak Hour Factor 0.79 Bike(Road) 2 6 256 10 1 Page A-47 298 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 275 Pope Avenue Pope Avenue - Lagoon Road/Beach Parking Lot AM Peak Hour 8:00 AM to 9:00 AM Lagoon Road Pope Avenue 337 98 Beach Parking Lot 41 Tuesday July 8, 2025 406 10722025 Total 2024 Total Coligny Circle Sea Pines Circle Intersection Total 74 24 1017 Percent Change 5.4% Page 110 of 138 Signal Number 503 0 54 337 191 1 Bike(Road) Bike Crosswalk Ped Crosswalk 27 10 Bike (Road) 0 Bike Crosswalk 168 0 Ped Crosswalk 61 6 59 12 Ped Crosswalk 25 5 Bike Crosswalk 21 0 15 30 0 Bike (Road) 32 3 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 446 Peak Hour Factor 0.93 Bike(Road) 2 7 572 20 0 Page A-48 1736 Sea Pines Circle Pope Avenue 800 379 Pope Avenue - Lagoon Road / Beach Parking Lot 583 67 199 79 1658 Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM Coligny Circle Intersection Total Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Beach Parking Lot Percent Change -4.5% Lagoon Road 216 2025 Total 2024 Total Pope Avenue 601 Page 111 of 138 0 40 1078 89 0 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 0 Bike Crosswalk 28 0 Ped Crosswalk 4 0 0 0 Ped Crosswalk 11 0 Bike Crosswalk 3 0 19 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 538 Peak Hour Factor 0.92 Bike(Road) 0 7 689 13 0 Page A-59 Sea Pines Circle Off Island Intersection Total 39 19 n/a Percent Change n/a 1207 19812025 Total 2024 Total Palmetto Bay Road - Dunnagans Alley/Enmark Driveway AM Peak Hour 8:00 AM to 9:00 AM Dunnagans Alley Palmetto Bay Road 717 102 Enmark Driveway 47 Wednesday July 9, 2025 1108 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 709 Palmetto Bay Road Page 112 of 138 0 18 1093 62 1 Bike(Road) Bike Crosswalk Ped Crosswalk 0 0 Bike (Road) 1 Bike Crosswalk 133 0 Ped Crosswalk 0 0 2 0 Ped Crosswalk 22 2 Bike Crosswalk 0 0 18 0 0 Bike (Road) 0 0 Ped Crosswalk Bike Crosswalk Highest 15 Min. Volume 666 Peak Hour Factor 0.99 Bike(Road) 0 9 1251 13 0 Page A-60 1273 1133 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM Enmark Driveway Percent Change n/a Dunnagans Alley 77 2025 Total 2024 Total Palmetto Bay Road Wednesday July 9, 2025 PM Peak Hour 4:00 PM to 5:00 PM Sea Pines Circle Intersection Total n/a Off Island Palmetto Bay Road 1387 Palmetto Bay Road - Dunnagans Alley/Enmark Driveway 1174 27 156 22 2625 Page 113 of 138 0 456 524 195 0 Bike(Road) Bike (Road) 0 158 0 228 279 205 157 0 80 0 Bike (Road) Highest 15 Min. Volume 834 Peak Hour Factor 0.86 Bike(Road) 6 51 337 195 1 Page A-56 Intersection Total 591 516 2892 Percent Change -0.7% 1175 28722025 Total 2024 Total Sea Pines Circle AM Peak Hour 8:00 AM to 9:00 AM William Hilton Parkway Palmetto Bay Road 774 547 Greenwood Drive 735 Tuesday July 8, 2025 815 Note: LMO States AM Peak Hour Will Be Between 7 AM - 9 AM 590 Pope Avenue Page 114 of 138 0 457 461 205 0 Bike(Road) Bike (Road) 0 280 0 251 284 267 160 1 148 0 Bike (Road) Highest 15 Min. Volume 888 Peak Hour Factor 0.97 Bike(Road) 8 77 495 351 0 Page A-57 931 884 Note: LMO Does Not Cite Midday Peak Hour. It is included for information. Greenwood Drive Percent Change -2.0% William Hilton Parkway 717 2025 Total 2024 Total Pope Avenue Tuesday July 8, 2025 Midday Peak Hour 11:30 AM to 12:30 PM Intersection Total 3515 Palmetto Bay Road 1059 Sea Pines Circle 1123 785 799 592 3445 Page 115 of 138 0 426 496 200 0 Bike(Road) Bike (Road) 0 330 0 214 364 186 133 0 123 0 Bike (Road) Highest 15 Min. Volume 899 Peak Hour Factor 0.98 Bike(Road) 5 67 624 346 0 Page A-58 Intersection Total 730 620 3668 Percent Change -4.2% 1122 35142025 Total 2024 Total Sea Pines Circle PM Peak Hour 4:00 PM to 5:00 PM William Hilton Parkway Palmetto Bay Road 1318 679 Greenwood Drive 707 Tuesday July 8, 2025 810 Note: LMO States PM Peak Hour Will Be Between 4 PM - 6 PM 1042 Pope Avenue Page 116 of 138 lan Ir • • • • • • 0 • • • • .. -'@ e • 0 - • • • • ¢ -e e • @,'@ Page 117 of 138 Codified Requirements for This Report Summary of weekday morning and afternoon peak hour turning movement counts for each signalized intersection within the Town Morning, midday, and afternoon peak hour turning movement counts for Sea Pines Circle in calendar years that are multiples of five Summary of 24-hour bi-directional demand on the Town’s major arterial network Historical trends relative to the previous 5-year period Description of operating conditions at each signalized intersection relative to the dual LMO-described operational goals Recommendations to successfully mitigate any identified deficiencies in operations relative to the LMO goals ( Page 118 of 138 William Hilton Parkway - Shipyard Drive/Wexford Drive Tuesday July 8, 2025 PM Peak Hour 4:30 PM to 5:30 PM :: · Shipyard Drive 192 0 88 19 84 1 148 ¢ 1 J I • ls 1I ¢ t 147 hoar rowait ee oegai 0 0 es> 0 >r q r3 1194 ¢ 3 ± -. 62 ±• •a tie wait aC .::, t 0 C £ 0 Intersection Total - 1010 £he oepai £ 1087 rE 69 I 0 t r- 15 E g 2025 Total 2657 lee gait .g 1243 3 1027 p t 0 C. 0 3 U bier oottair 2024 Total 2802 .,, C C 3 1 3 2 147 y Percent Change -5.2% 3t t1134 - 0/ ~r¢ #f 3ul 0 0 0 181 t ¢eeonwai baa oera I n ., 1 r 4 3 i0 96 15 23 0 134 Wexford Drive Note: LMO States PM Peak Hour Will Be Between 4 PM-6 PM • ••• Page 119 of 138 Table One – Average Bi-Directional 24-Hour Demand July 2025 • Page 9 TABLE ONE 24-HOUR BI-DIRECTIONAL TRAFFIC DEMAND - JUNE 2020-2022° JULY 2023-2025° Map 5-year Ref. Location 2020 2021 2022 2023 2024 2025 %change/yr, 1)m. Hilton Pkwy. at J. Wilton Graves Br. 58.973 63,304 61,628 63,434 63,861 62,444 +1.2 2) Wm. Hilton Pkwy. west of Cross Is. Pkwy. 49,660 56,270 56,492 57,287 59,513 57,475 +3.0 3)Wm. Hilton Pkwy. east ot Whooping Crane 42,120 46,901 41,679 40,913 43,321 40,878 -0.6 MLWm. Hilton Pkwy. east of Coggins Pt. Rd. 30,655 34,758 29,282 28,146 29,260 27,713 -2.0 5)m. Hilton Pkwy. west of Queens Folly Rd 39,361 43,806 36,678 37,202 36,886 35,263 -2.2 6) Wm. Hilton Pkwy. west of Arrow Road 26,347 29,682 26,310 26,336 26,131 24,020 -1.8 7) Pope Avenue south of New Orleans Rd. 31,709 34,156 32,569 34,514 33,373 32,102 +0.2 8) Palmetto Bay Rd. south ot Pt. Comfort Rd. 26,029 27,661 32,634 34,564 34,060 32,785 +4.7 9) Cross Island Pkwy. south of W. Hilton Pkwy. 16,593 17,734 20,905 22,326 22,910 22,022 +5.8 10) Cross-Island Pkwy. at Chas. Fraser Bridge 26,421 29,256 34,990 37,881 37,362 36,526 +6.7 TOTAL OF ALL TEN STATIONS 347,868 383,523 373,167 392,603 386,677 371,228 +1.3 Composite Rate of Change - 2024-2025= Composite Rate of Change- 2023-2024= Effective Composite Annual Rate of Change - 2020-2025 = +1.1%." +1.3%¢ The Town began taking its annual traffic counts in July instead of June in 2023 due to a Land Management Ordinance (LMO) revision. II three rates based exclusively on the data presented in Table One Page 120 of 138 Shift in Traffic Demand From William Hilton Parkway to the Cross- Island Parkway. Following End of Toll Collection on Cross- Island Parkway June 2021 - Toll Still Being Collected Wm. Hilton Pkwy. - 68.5% Cross-Island Pkwy. - 31.5% July 2025 – 4 Yrs. Following End of Toll Collections Wm. Hilton Pkwy. - 62% Cross-Island Pkwy. - 38%* • Page 9 Page 121 of 138 TABLE TWO SCDOT 24-HOUR AVERAGE BI-DIRECTIONAL DEMAND ON JENKINS ISLAND 2015 – 2025 (CALENDAR YEAR AVERAGE – AADT) YEAR AADT % CHANGE 2024 – 2025: - 0.5% % CHANGE 2023 – 2024: - 4.1% AVG. ANNUAL RATE OF CHANGE 2020 – 2025: +2.0% AVG. ANNUAL RATE OF CHANGE 2015 – 2025: +0.4% 2015 54700 2020 51400 2021 57400 2022 57400 2023 57900 2024 57100 2025 56800 • Page 10 a (@fa /»-@} ' • ••I • I - 0G I - • - - • • - • Page 122 of 138 Table Three – Signalized Intersection Demand 2025 vs. 2024 • Page - 11 TABLE THREE PEAK HOUR SIGNALIZED INTERSECTION VOLUME - JULY 2024-2025 AM PM 2025 Vol. 2024 Vol. %Chg. 2025 Vol. 2024 Vol. %Chg. William Hilton Pkwy./ Crosstree Drive 4103 4887 William Hilton Pkwy./ Squire Pope Rd. 4224 4310 -2.0 4904 5047 -2.8 William Hilton Pkwy./ Spanish Wells Rd. 3955 4243 -6.8 4385 4693 -6.6 William Hilton Pkwy./ Gumtree Rd. 3356 3379 -0.7 4377 4251 +3.0 William Hilton Pkwy./ Wilborn Rd. 2865 2956 -3.1 3595 3570 +0.7 William Hilton Pkwy./ Pembroke Dr. 2756 2894 4.8 3421 3430 -0.3 William Hilton Pkwy./ Whooping Crane Way 3175 3058 +3.8 3450 3845 -10.3 William Hilton Pkwy./ Beach City Rd. 2780 2963 -6.2 3357 3512 -4.4 William Hilton Pkwy./ Mathews Dr. (north) 2577 2550 +1.1 3351 3473 -3.5 William Hilton Pkwy./ Dillon Rd. 2253 2161 +4.3 2853 2959 -3.6 William Hilton Pkwy./ Coggins Point Rd. 1901 1831 +3.8 2534 2603 -2.7 William Hilton Pkwy./ Beachwood Dr. 1507 1621 -7.0 2112 2229 -5.2 William Hilton Pkwy./ Mathews/ Folly Field 2371 2413 -1.7 3144 3314 -7.1 William Hilton Pkwy./ Singleton Beach Rd. 2048 2016 +1.6 2805 2863 -2.0 William Hilton Pkwy./ Sh. Cove Ln. (off-is.) 1958 1940 +0.9 2721 2776 -2.0 William Hilton Pkwy. I Sh. Cove Ln. (central) 1977 1952 +1.3 2831 2936 -3.6 William Hilton Pkwy./ Queens Folly Rd. 2265 2304 -1.8 3240 3407 -4.9 William Hilton Pkwy./ Queens Way 1694 1711 -1.0 2236 2517 -11.2 William Hilton Pkwy./ Shipyard/ Wexford 1830 1843 -0.7 2657 2802 -5.2 William Hilton Pkwy./ New Orleans Rd. 1555 1687 -7.8 2322 2542 -8.7 William Hilton Pkwy./ Arrow Rd. 1583 1598 -0.9 2087 2319 -10.0 Pope Ave./ New Orleans/ Office Park 1863 2012 -7.4 2894 3099 -6.6 Pope Ave. 1 Cordill Pkwy. 1760 1784 -1.3 2517 2577 -2.3 Pope Ave./ Lagoon Road 1072 1017 +5.4 1658 1736 4.5 South Forest Beach Drive Pedestrian Signal 600 645 -7.0 1119 1107 +1.1 Palmetto Bay Rd./ Target Rd. 2315 2380 -2.7 2964 2964 0.0Palmetto Bay Rd./ Arrow/ Point Comfort 2555 2711 -5.8 3273 3327 a.aSea Pines Circle 2872 2892 -0.7 3514 3668 4.2 TOTAL' 61667 62871 -1.9 80321 83566 -3.9/ 2025 Vol. 2024 Vol. %Chg. Sea Pines Circle Midday Peak Hour 3445 3515 -2.0% Total does not include the intersection of Wm. Hilton Pky/Crosstree Drive due to no comparable 2024 counts being taken at this location. Page 123 of 138 • Page - 12 • .. •e TABLE FOUR - .. • )r@.Y@ .. I .. OFF-STREET' FOUR-HOUR PEDESTRIAN/ BICYCLE CROSSING DEMAND AT• ¢ e e • e SIGNALIZED INTERSEC IONS_- JUNE_JULY 2020-2025 • ,g .. .. •- July lub June 5-yr.% Chg. 2025 2024 2020 2020-2025 Wiliam Hilton Pkwy. / Crosstree Drive 0 NOT COUNTED William Hilton Pkwy. / Squire Pope Rd 3 1 0 Wiliam Hilton Pkwy. / Spanish Wells Rd. 5 22 12 -58 William Hilton Pkwy. / Gumtree Rd 23 12 13 +77 Wiliam Hilton Pkwy. / Wilbom Rd 21 18 20 +5 William Hilton Pkwy. / Pembroke Dr 29 25 32 -9 Wiliam Hilton Pkwy. / Whooping Crane Way 0 2 4 -100 William Hilton Pkwy. / Beach City Rd 39 66 29 +34 Wiliam Hilton Pkwy. / Mathews Dr. (north) 90 73 80 +12 William Hitton Pkwy./ Dillon Rd. 72 102 85 -15 William Hilton Pkwy. / Coggins Point Rd 0 2 0 Wiliam Hilton Pkwy. / Beachwood Dr. 75 99 157 -52 Wiliam Hilton Pkwy. / Mathews / Folly Field 132 155 194 -32 Wiliam Hilton Pkwy. / Singleton Beach Rd. 166 191 180 -9 William Hilton Pkwy. / Shelter Cove Lane (ft-island) 48 69 64 -25 Wiliam Hilton Pkwy. / Shelter Cove Lane (central) 28 69 64 -56 : Wiliam Hilton Pkwy. / Queens Folly Rd 3 0 0 Wiliam Hilton Pkwy. / Queens Way 140 171 279 -50 ,, Wiliam Hilton Pkwy. / Shipyard / Wexford 26 44 35 -26 William Hilton Pkwy. / New Orleans Rd. 82 83 267 -69 , Wiliam Hilton Pkwy. /AITOW Rd 102 136 242 -58 Pope Ave. /New Orleans / Ofce Park 189 231 403 -53 Pope Ave. / oIdilo Pkwy. 461 532 509 -9 Pope Ave./ Lagoon Road 907 851 914 -1 South Forest Beach Pedestrian Signal 1226 1157 915 +34 Palmetto Bay Rd./ Target Rd. 75 84 74 +1 Palmetto Bay Rd. / Arrow/ Point Comfort 37 35 56 -34 TOTAL 3979 4233 4627 -14 'Of-street refers to pedestrians and bicyclists using sidewalks, pathways, or shoulders, not the roadway. Only crossings occurring between 7.00 and 9.00 a.m. and 4.00 and 6.00 p.m. are included. Page 124 of 138 HCS Signalized Intersection Results Summary General information Intersection information Agency Town ol Hilton Head Island, SC Duration, h 250 Anab rst Darrin A. Shoemaker, PE Analysis Date Jul 9. 2024 Area Type ther Jurisdiction SCOOT Tune Period pm peak hour PHF 96 existing conditions Urban Street pope Avenue Anet /sis Year 2024 Ana sis Period 1> 17:00 Intersection New Oreans Road /Of.. File Name 24501pm0ex.xus pro»ct Desa ton pm peak hour - existing conditions Demand information EB W8 NB SB Approach Movement L T R L T R L T R L T Demand (v), ven/h 88 158 184 270 72 29 128 952 324 112 708 Signal Information w Cvcde, s 160.0 Reference Phase 2 , fOffset, s 0 Reference Point End Green 75 06 820 104 0.3 22 8 Uncoordinated No Simutt Gael EN o Yellow 30 0.0 36 3.2 3.2 32 force Mode Fed Simut Gap NS On Red 44 00 30 4.3 4.4 43 Tiner Results EBL ET W8L wBT NBL NBT sL s Ass ined Phgse 3 8 7 4 1 • 5 Case Number 20 30 2.0 3.0 11 30 11 3 Phase Duration, s 179 30.3 257 38.2 15.4 89.1 14.9 88 Change Period, (Y+R), s 7.5 76 7.6 76 73 66 74 6 Ma Alow Headwa MAH,,s 31 32 3.1 32 31 0.0 31 0 Queue Clearance Time s,$ 104 21.1 17.6 7.5 8.0 74 Green Extension Time(g), s 01 07 06 09 02 0.0 02 0 Phase Calt Probabilt 0.98 1.00 1.00 099 1 00 0.99 Max Out Probabilt 0.00 0.02 0.00 0.00 0.00 0.00 Movement Group Results EB W8 NB sApproach Movement L T R L T R L T R L T Assued Movement 3 8 18 7 4 14 6 16 5 2 Adjusted Fow Rate(v), vehh 92 165 192 281 75 30 133 992 338 117 738 Adjusted Saturation Flow Rate (s), vehhn 1723 1828 1567 1422 1826 1620 1706 1522 1615 1654 1521 Queue Serwce Time(g+), s 8.4 136 191 156 55 25 6.0 288 11.1 54 250 Cvcle Queue Clearance Time(ge), s 8.4 13.6 191 15.6 5.5 25 6.0 28.8 1.1 54 250 Green Ratio (9C 0.06 014 014 011 0.19 019 0.56 0.52 0.63 0.56 0.51 Capacity (c) veth 112 250 222 322 349 309 382 1570 1021 294 1558 • g - - • Volume-to-Carat Ratio x) 0.822 0636 0.863 0.872 0215 0098 0.349 0.632 0.331 0.396 0473 0 - Bak of Queue 0,, nn 95 h ercentile) 191 278 351 259 122 48 109 327 154 99 371 I Bak of Queue (Q), vetin (95 th percentile) 7.3 107 135 9.9 4.7 18 42 126 59 38 143 - Queue Storage Ratio (RQ)(95 th percentile) 0.76 0.19 1.25 1.26 0.08 0.27 0.61 022 0 67 0.37 0.58 Uniform Dela di)swveh 73.9 648 67.1 69.8 546 53 4 186 16.6 84 204 25 1 • - • - • • Incremental Dela (dz,s/eh 10.5 1.9 15.9 5.6 02 01 02 12 05 06 1.0 - - Initial Queue Dela ds,,sveh 0.0 00 00 0.0 00 00 00 0.0 0.0 0.0 0.0 Control Dea d«,swveh 84.4 66.7 83.0 754 54.8 535 189 17.8 9.0 21.0 26.2 Level ot Service (LOS) F E F E 0 0 8 B A C C roach Delay. sNven /LOS 77.3 E 69.7 E 15.8 B 25.1 C Intersection Dela,, sveh /LOS 336 C Multimodal Results EB WB NB s8 Pedestrian LOS Score /LOS 2.99 C 2.86 C 256 C 238 B Bicvde LOS Score Los 3.81 0 3.74 0 3.91 0 3.34 C Page 125 of 138 INTERSECTION v/c RATIO CALCULATION 501 Pope Avenue w/ New Orleans/Office Park Rds 2025 PM Peak Hour - Existing Conditions , 05. o.016 /0 0,L----"---------------- ~ +--- 0.244 0.037 0.037 "# " [0.310 0.086 0.093 u··,0.048 • 0.050 0.048 + 0.244 = 0.292 0.037 + 0.037 = 0.074 ,= 0.050 +0.310=6.369) Aas +o.093 =6.ma = 0.539 x(170/162) = 0.566 0.048 + 0.021 =0.069 """? • e' • • • -: '@ = @a '@ Page 126 of 138 • Page 16 TABLE SIX- MORNING PEAK HOUR INTERSECTION VOLUME-TO-CAPACITY RATIOS AND AVERAGE TOTAL DOEUY IN SECONDS PER VEHICLE JULY 225 ND COMPARABLE 2024, 2020, AND0 215 FIGURES 202$ 2024 2020 2015 Intersection vlc dpv vl¢ dpv vlc dpv vlc dpv Wm Hton Parkway wth Crosstree DmveC Hennchs Circle 083 137 NOT COUNTED NOT SIGNAUZED Wm Hton Parkway wth Squire Pope Road/Chamberin Drive 069 219 071 200 073 168 0.92 191 Wm Hton Parkway wth Spanish Wels'Wild Horse Roads 059 145 061 163 069 143 067 141 Wm Htton Parkway wth Gum Tree Road/Cross-/sland Parkway Ramps 072 533 070 468 071 314 080 37 Wm Hton Parkway with Wibom Road/.Jarvs Park Dmve 059 41 059 56 059 46 073 42 Wm Hton Parkway wth Pembroke DmveMuseum Street 057 106 060 106 061 128 061 112 a @ id Wm Htton Parkway wth Whooping Crane Wayndgo Run Drve 054 224 061 213 0 59 195 064 187 ·- Wm Hton Parkway wth Beach Cty Road/Gardner Drve 0 46 168 051 182 052 157 061 192 e I • e Wm Hton Parkway wth lathews Drve (northern ntersecton) 043 262 046 285 049 200 050 197 i a Wm Hton Parkway wth Dton RoadPlaza Dmve 0 48 170 045 176 049 153 046 127 • Wm Hton Parkway wth Coggns Pont Road 038 179 038 152 045 143 036 129 WmHton Parkway wth Beachwood Drve 030 18 029 14 034 19 032 14 Wm Hton Parkway wth Foly Field RoadMathews Drive 045 221 040 219 047 221 039 225 Wm Htton Parkway wth Singleton Beach Road 043 33 040 44 0 50 36 0 46 27 Wm Hton Parkway wth Shetter Cove Lane (off-island intersection) 043 26 038 31 046 35 NOT SIGN«Lu2ED Wm Hton Parkway wth Shelter Cove Lane (center intersecton) 041 60 041 58 048 47 048 65 Wm Hton Parkway wth Queens Foly RoadKng Neptune Way 037 265 037 239 047 33 054 200 Wm Hton Parkway wth Queens Way 036 47 036 49 040 56 036 43 Wm Hton Parkway wth Shipyard'Wexford Dmves 042 197 040 167 043 152 037 102 Wm Hton Parkway wth New Orleans Road/Village at Wexford 033 88 035 9.1 036 72 030 138 Wm Hton Parkway wth Arrow Road 041 22 037 232 031 16 0 030 n77 Pope Avenue wth New Orleans/Ofe Park Roads 0 44 250 045 258 034 n78 036 182 Pope Avenue wth Cordillo Parkway 0 46 263 044 27 5 037 198 030 196 Pope Avenue wth Lagoon Road8each Parang Lot 021 127 018 99 0 20 109 NOT SIGNALIZED Palmetto Bay Road wth Target Road\sland Crossings Shopping Or 052 127 053 132 056 134 049 143 Palmetto Bay Road wth Arrow.Point Comtot Roads 050 199 049 17 5 048 190 049 166 ve- intersecton Volume-to-Capac.My Rato dpv - Average Total Delay-per-Vehicle in seconds NOTE Operatonal condtoons /aeng to comp'y wt goals set tort in the LAO are sown in Page 127 of 138 Table Seven – Afternoon Peak Hour Analysis Results • Page 16 ABLE SEVEN - AFTERNOON PEAK HOURINTERSECTIONVOLUME-TO-CAPACITY RATIOS AND AVERAGE TOTAL DELAY IN SECONDS PER VEHICLE JULY 225 AND COMPARABLE 2024, 2020, AND 2LS5 FIGURES 2025 r 2024 2020 2015 Intersection vl¢ dpt vlc dpv vlc dpv vlc dpv Wm Hilton Parkway with Crosstree Drive/C Hennchs Circle 089 91 NOT COUNTED NOT SIGNALIZED Wm Hilton Parkway with Squire Pope Road/ChamberlinDrive 1.01 62.6 0.99 476 1.13 79.9 1.10 58.5 Wm. Hilton Parkway withSpanish Wels'Wid Horse Roads 066 276 0.65 229 075 234 079 252 WmHiton Parkway with Gum Tree Road/Cross-/stand Parkway Ramps 072 48.0 0.69 534 072 347 088 26.1 WmHiton Parkway with Wilborn Road/.Janis Park Drive 0.71 148 0.70 125 070 103 0.75 6.4 Wm. Hilton Parkway with Pembroke DriveMuseum Street 0.66 24.5 0.65 21.7 0.67 20.0 0.73 262 Wm. Hiton Parkway with Whooping Crane Way/ndigo Run Drive 070 21.3 070 19.8 0.75 186 082 194 Wm. Hilton Parkway wth Beach City Road/Gardner Drive 062 168 063 239 072 242 071 122 Wm. Hilton Parkway with Mathews Orve (northern intersection) 058 289 063 339 066 206 068 288 Wm Hilton Parkway with Dillon Road/Plaza Dmve 063 191 062 207 066 127 067 141 WmHton Parkway with Coggins Point Road 056 143 056 14.5 061 104 059 167 Wm. Hilton Parkway with Beachwood Drive 042 22 041 1.8 050 1.8 048 18 Wm. Hilton Parkway with Folly Field Road/Mathews Drive 057 33.1 0.63 33.1 0.65 26.9 065 263 Wm Hilton Parkway with Singleton Beach Road 046 36 050 43 O.55 38 0 46 4.0 Wm Hilton Parkway wth Shelter Cove Lane (off-island intersection) 0.46 38 0.50 47 0.54 46 NOT SIGNALIZED Wm Hiton Parkway with Shelter Cove Lane (center intersection) 045 14.6 049 159 055 123 064 16.0 Wm Hilton Parkway with Queens Foy Road/King Neptune Way 051 304 0655 317 067 2a7 081 447 Wm Hiton Parkway with Queens Way 040 48 047 60 066 72 066 77 WmHton Parkway with Shipyard'Wexford Drves 050 202 055 230 064 214 056 154 Wm. Hilton Parkway with New Orleans Road/ilage at Wexford 059 226 0.65 228 064 17.0 057 278 Wm. Hilton Parkway wth Arrow Road 049 34.3 056 43.6 0.46 288 048 223 Pope Avenue with New Orleans/Office Park Roads 057 30.9 063 336 057 238 062 29.6 Pope Avenue with Cordillo Parkway 050 30.9 049 331 053 249 0.61 241 Pope Avenue with Lagoon RoadBeach Parking Lot 040 231 039 234 050 318 MOT SIGN4Lu2ED Palmetto Bay Road with Target Road/sland Crossings Shopping Ctr 054 239 058 249 051 224 059 23$ Palmetto Bay Road with Arrow/Point Comfort Roads 074 257 076 284 066 267 o72 261 vie - IntersectionVolume-to-Capacity Ratio dpv • Average Total Delay-per-Vehicle in seconds NOTE. Operational conditions fang to compy wth goats set tortn in the LMO are shown in Page 128 of 138 Change From June 2024 to July 2025 • Page 13 Decrease from 2024 in all 3 peak hours Morning Peak Hour Demand -07% Midday Peak Hour Demand -2.0% Afternoon Peak Hour Demand -4.2% • • Page 129 of 138 General lnformation 4nabyst Carrin A Shoal. Pt hters,etie Su Pines rde qenyor o Kt LW Street tare Greenwood Dr/wmn +ton.. Date Performed 07/98/2025 MS Snet Nam lnoeto toy Rd.,/ope e. 4n3»,is ear 222$ rob,is Tire erod, Ms 02s Tee #mated we pee hour - eistng ct. Peal Mor Facto 0e6 Projet Description 202$ TM&t Report Jrsod iron $coo Volume Adjustments and Site Characteristics pproah t w9 Me st #overvet u I L t a u I L • u I T I R u T I • turnber at Lare N 0 0 0 0 0 0 0 0 0 0 Loe ssigeent UR r rt Lr Mure lvet9 • 279 10 0 0 2s 22a 158 6 s1 33 195 • 195 52 4$6 Perent Hesay Veicier, M% $ s $ 5 5 Few» Rate wed, pey • 31 12 98 0 2s0 278 193 62 411 23 0 238 a0 $s7 Rght-Tum yposs on-'Yielding Non-Yielding Nor-ieldrg Nor-Yeding - • - CenfictingLanes• Petestrare rosing ph 0 • 0 - Proporticn tAs, % 0 Critical and Follow-Up Headway Adjustment ¢ - roach t w t3 Se • Lare +et Right pp0ss et in boss Len Rot bypass Lett Right bypass i Critical achwy, 49763 49763 4.9763 49763 • fotow-3 Hg0way.,$ 26087 26cc87 26087 26e7 Flow Computations, Capacity and v/ Ratios oporah El w N9 50 Lare Let Right 8/poss et ugh brass Left it bypass Left tight bypass tryFew MA, poh 533 9€ s28 193 40 21e 7a 557 Entry Volume, ve#A sce 92 $03 134 457 227 836 530 Circulating owtw4, ph 113s 821 7 $97 ting flow {wl pc/ 430 340 rs2 897 Caaity (lph 434 $97 629 751 Cady (veth 413 569 $99 1v Ratio ! 123 ¢99 07 1,M7 Delay and Level of Service pprot .. wt ta $3 Lave Lett gmt ypMs et n ypass et igt. bypas Let Rig ypons Lano Controt Delay 4n1 wt 151 412 26 n123 Lune LOS A A 0 # 4 9% Qee Length, Qnes pet) 209 12 7.0 2it 95% Queue Leng Q /ti 434 252 1820 696 Approach ety. wen ]Ls 1282 I 22 0 19 c +87 I nrsecionDelay. s/we] Lo$ t1 Page 130 of 138 • Page 14 a a • a a ¢ TABLE FIVE - JULY 2025 HCM ANALYSIS TOTAL AVERAGE DELAY PER VEHICLE RESULTS ON APPROACHESTO SEA PINES CIRCLE (in seconds) AM Peak Hour Midday Peak_Hour PM Peak Hour 2025 2024 2025 2024 2025 2024 Greenwood Drive 128.2 (76.8) 50.9 (47.3) 59.0(61.5)Palmetto Bay Road 68.7 (49.2) 38 O /27.1) 222(19.2)Pope Avenue 17.8(13.4) 28.6 (23.4) 74.9(52.2)William Hilton Parkway 30.2 (17.0) 54.9 (34.8) 40.1(37.0) Page 131 of 138 William Hilton Parkway & Squire Pope Road/ Chamberlin Drive Intersection • Pages 18-19 1 • 4 , o""794», gee V~ ~-... m reg]}7flKu'' . ,{ "is f %<°$ $$ t %R%. -~r: I .. Page 132 of 138 William Hilton Parkway & Gum Tree Road Intersection • Pages 19-20 4 « ' € EE;a 'it "} E , - ; ·~~ , - \M ~ ea • ~ M3, s ff$?3zgs "i k4 ,"_Alull ""Rx, ""r, • • Page 133 of 138 Town Council modified the operational goals outlined in Section 16-5-106.C of the LMO by enacting ordinance 2025-18 last August. This ordinance added two additional goals to the longstanding capacity- and delay-based operational goals described in this section. The two operational goals added: • Pages 20-24 TABLE EIGHT- INDIVIDUAL TRAFFIC MOVEMENTS DECLINING BY MORE THAN ONE LEVEL OF SERVICE - JULY 2024 TO JULY 2025 • • a • •• • • •• • • AM/PM 2024 2025Intersection Movement Peak Hour dpy LOS dpy LOS Wm. Hilton Pkwy Eastbound Left Turn w/ Squire Pope Rd from Wm. Hilton PM 10.8 B 46.8 D / Chamberlin Dr Pkwy. Wm. Hilton Pkwy. Eastbound Wmw/ Gum Tree Hilton Pkwy. Through PM 19.9 B 35.9 D Rd./XIP Ramps Pope Avenue wt Southbound Right Gordillo Parkway Tur onto Gordillo PM 8.8 A 20.5 C Pkwy Wm. Hilton Pkwy. Sea Pines Circle Entering Circulating AM 24.2 C 41.2 E Roadway dy -- Average Total Delay per Vehicle in seconds .. • • • • • a • • •• • TABLE NINE -- INDIVIDUAL TRAFFIC MOVEMENTS DECLINING FRoMLosEToLQsE-JuY2024roJuLY 2025 • • a ••a • • • • • • •• • a • • • • • • AM/PM 2024 2025• g e'g • • • Intersection Movement peakHour d¥. LOS dpx. LOS • • • • • • • • • Northbound Left Turn AM 751 E 80.8 F• • • • from Chamberlin Dr. • • Wm. Hilton Pkwy Northbound Through• wl Squire Pope Rd from Chamberlin Dr. AM 75.5 E 80.9 F / Chamberlin Dr Southbound Left Turn AM 78.8 E 83.9 Ffrom Squire Pope Rd Wm. Hilton Pkwy. Northbound Left Turn wl Spanish Wells I from Spanish Wells AM 77.8 E 86.8 F • - - - • • • • Wild Horse Rds Rd• • • • e Wm. Hilton Pkwy Eastbound Left Tum @e • • • • • • @'e • • • • • w/ Beach City from Wm. Hilton PM 79.2 E 87.4 F e e e Rd /Gardner Dr. Pkwy. Wm. Hilton Pkwy. Northbound Left Tum • • .a w/ Dillon from Plaza Dr PM 78.5 E 80.3 F Rd./Plaza Dr Wm. Hilton Pkwy. Southbound Left Turn PM 75.3 E 88.4 Fwl Arrow Rd. from Arrow Rd. Pope Ave. w/ New Westbound Left Tum Orleans/Office from New Orleans PM 75.4 E 81.4 F Park Rds. Rd. Pope Ave wl Westbound Right Gordillo Pkwy Turn from Gordillo. PM 69.6 E 80.2 F Pwv. Sea pines Circle Southbound Palmetto AM 49.2 E 68.7 FBay Road Approach dy- Average Total Delay per Vehicle in seconds Page 134 of 138 %,% \..._ r $ /" ..°""«e s• $«o s7 ¢= ).._,.._._ cJ<--$<y..Or,...O «"8 •.sf 4L_ •• -0 • • • • • • - @ e'@e • • APPENDIX B PAGE B-2 towoo ttto oat ts£a teat.atpot et- Town of Hilton Head Island 24-Hour Traffic Count Locations July 2025 etetti.toet.teeroodleetee eel Page 135 of 138 ob horuany ore ohtee At Lare Ma vu le le khy lore a.tlrr ortr corm tebee aloe herbe re Renter ire35229 4715 ' o4 s $33 1 $1001 ' 6929 me 5044.2 1 982 1 498 1 47354et 4I 432 ,e 63 $;791 :• 9793 042 420.79 s29rs39 $279 s76 $0¥ 63I 3 as,20 90 619/1 518 $0071 4tat% $oeo $943 4t9 183 • $to4 $414 st9 $3)9 st1a $tu452 $71 $1 $ a/ ,2 s 27 S 6$45 s913 52002 43s2 ses90 $91n3 so9 $732 641 6 $03I 6191 a $271s $;8 $444 %2 «c2. 406.23 $9603 6.74 6M636 0o 3 1 $tut 6261& 63a 421M 8$92 6657 3519 $0%1 49ss 629 6417 1 at.0 6±# • 4t) 4n0 • t4» • $0067 $9201 $221 99 4092$ ........ 6u» $940 6292» • er 9 587M • """ 9 41$ $211Soos 10 9999 1o 56003 10 t0 $302% to 42791 L 626.2$ 0 444.39 12 5et 10 62022 L0 $6438 10 $6314091 1 6.$ 1 a " 1 49 t 6316 a .1 6536 11 5079 11 106¢ 11 5193 11 779337s 2 $20 t ta1 12 621t9 1 $34au u t15 a $914 2 st19 u 3 a s732 a $0s1so.22 1 5641 1 656$1 " 494.2 13 ii '.' cu 1 $9065 » 6054 13 547 13 920 u 6003 1 46351 4o.2 " 46360 vane 14 6315 ta 6;2+ ii .4 62at 1t 4u2 1t 1.2 it 60727 1a 9716$632 1s at7 1s $9240 1» 6411¢ 1$ 42) 15 971 1$ 629%9 .$ 63369 18 $73a 1$ 16 1$ 48$6 1$ $19$994 1 3249 t 113 a iis 16 61$25 1 $9 .$ 9s.2 s $9n2 1¢ 43rs 16 40220 16 $921I 567 11 $5025 1 «o9so 1 624 " 437t 7 7 44t 17 $9s0 7 44 1 56264 17 94226 1i 0222 18 64036 " 1t $? a a a 7s9 1s s220 1u 44 1a $735 1s 5$145 36M9 19 $Moo 1 4as.24 19 41st 19 $9» 19 9 s 19 $ 19 4$¢ 19 890 19 23$0as 20 s.1 ii 20 $0$ 20 62$4.0 2o 509 o 811? 2 $6769 20 es2 20 999a a0 479449t 2 9a9 " 6$752 ii 21 ::.;::·" 1 61061 " .2/ 1 14 1 619 " 949/0 " 4927 2 9.2 2 639 22 $29.2 2 60190 22 $36 2a 6ts 2a s.299 a $913s26 " 4127 2 a9on9 2 ti.' 2 1 621 21 " $0 1 $45 " 1M 2 417 1 o2329o 2 54624 2 61158 ht ja t9to q4 33 1a4 6$3 24 44.290 24 9000 2 2r 2 $9 4 7215 l r 2s 9n3 2 c9 1s 4t7ts 15 932 2s s $6124 1s s1102 1s $12 1s 632$3 1s 241$ • • ... • 329s 2 647 M 6391s 2 9e0I 26 $423 a 2 6 476 " $1007 2 4112 2 coo.2e 2 $0329 5071: » 6. 2 6310 2 so19o 17 6Mt? 1» " s233 1 60073 1 $0108 2 $90 2 3139 1 s14a3 2a 6030 »a u cn7 2s 6» 2a 2a 6oe1 t 62519 2 409 28 $75 28 $34 s 42101 9.2 1 6co3 19 19% 19 0¥. 29 $2545 29 621$3 »a 29 $7»9 29 is 29 4¢ 29 $032$83 M 4537 30 63,us9 30 4 30 3eo so 6397 " $279 0 $5$3 90 99 0 4068 90 266o$2n 3 599002 1 .o 3 6491 it «47 3 97 »1 $33 I 4$$3 $9i 58626 62968 463 6232 6is sm $62s8 $00.± $3a1 so90 • ...- 1ao 1$9 4us 141u $±1% 131J% 129 472% 1 04¥ 441 -327% -1$9% • • ... eei g Hr M boost Monett i-de hg. re2 tgs63 #et 62965 ·) ' 23-a o9a on the 1o, pt lotae pee rut vu6t $$16022 lair 23n l 1e 9s nee th 1per lieree$96M . , lily 620 -1 1A : vonow asor owow hetee 2 43$% e • 989a 1 May 43 1 2Mun 6±!$23» Mart $6.2 tit 82$149 tat $0M + -ii 214432 Otote $015 ·1 t.Apr en73 Spee $625a +1 4-Age 6a.23 hetrwry $u 1 2n gin9 titastr'@) Moot $M41 10 2Mau or; u 3p 6633 Dearetae so70 ·1 1 2-Mi 6toe • t1Ml 66165 iauarr 4$43 " 3-l 6ota +$ b0-er 6144 1» 2$A 47a3 • 2Mn 694 21kn 67 st s4.21 1% 19n 67#.9 65752 1 15-Mu "m 6$41 22a 67143 664% sues 0es etde a 2 67115 447 $¢ $-4 a1019 14Ma 671t 65310 57 %r 63410 tar 67341 " 6922» st 314ta, 3c21 lMl 60012 dd 506 $9 17i 617n2 1-Ml 69 ts/h totireDy --» 13 64932 6 14a, t328 23 in a.o 6 4929 61 1$Ma a21a tau ts 1 6491s 6l 21Ma 412s 21Mo 63 e a89 6) 27Mn 6462 2 19-kl .7 a,0 • 194 415s8 n 29Aug 653 as1s % p.A at12a 1%uu 4 » ...., e 2A i029 1Mua 6a.' s2 19-Mal 64526 67 1Mt a4790 Ma et4 $1 -a 64$1 u 1#Ma 09 Pct -231 2a 44a t 14pun at 9 2»Ma 6991s u 13Ma 6. " 17-or 44 " 29-Ma, 61 Page 136 of 138 €2u, S, Department of Transportation Federal Highway Administration Office of Highway Policy Information Page I TRAFFIC VOLUME TRENDS July 2025 Travel on all roads and streets changed by +1.7% (+4.9 billion vehicle miles) for July 2025 as compared with July 2024, Travel for the month is estimated to be 296.0 billion vehicle miles. The seasonally adjusted vehicle miles traveled for July 2025 is 276.6 billion miles, a +1.6% (+4.4 billion vehicle miles) change over July 2024. It also represents a +0.5% change (+1.5 billion vehicle miles) compared with June 2025. Cumulative Travel for 2025 changed by +0.9% (+17.1 billion vehicle miles). The cumulative estimate for the year is 1,919.0 billion vehicle miles of travel. Estimated Vehicle-Miles of Travel by Region - July 2025 - (in Billions) Change in Traffic as compared to same month last year. • I • 0 • tee. A data tor ts north ne preeieminney. Revset vshoe thee pnevus month ahhowm in Tables 1and2 #t wetwice-mes. otrowel computed with hey Sastis 2023 Table v-2as a bas Comrpoded wah data on hand as ot September 03, 2025. Some historical deta were newsed based on MS ind mended TVT ta as of Deeter 2023. fr inform.ton on total' kenned driers in the tu.S http://www.tho.dot.gov,poly/opt./hpubs.htm. Select the year o interest then Seton 6 (Doer Licensing for intorraton on total topstere motor weices in the .S., vit http.//wow.he.dotgov/porev/ohp/ts/hssobs.tm Select the wear ot interest and Scton ? Motor veides.] To faoleant hstori nbis, the yMT tug, tr the seasonally adhostd' series, have been opated for the 1? months onor tthe ourent month and in alotter months., held a the value tom lost months rise. Page 137 of 138 Darrin A. Shoemaker, P .E., PTOE (843)422-7649 Darrin.Shoemaker@ice-eng.com Theresa M. McVey Traffic Operations Manager, IMSA LEVEL II (843)341-4778 theresam@hiltonheadislandsc.gov Page 138 of 138

Source: Town of Hilton Head Island website. First collected Oct 13, 2026.