Town Council Workshop Meeting — Agenda Packet
Town of Hilton Head Island · Beaufort County · Town Council · meeting of Apr 28, 2026 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
Town Council Workshop Meeting
Tuesday, April 28, 2026, 3:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Adoption of the Agenda
3. Workshop Discussion
a. Beaufort County Update on William Hilton Parkway Gateway Corridor Bridge
Project
b. Review and Discussion of Proposed William Hilton Parkway Gateway Corridor
Master Plan
4. Public Comment - Non Agenda Items
5. Adjournment
FOIA Compliance: Public notification of this workshop has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 1 of 77
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Town Council
TO: Town Council
FROM: Shawn Gillen, Assistant Town Manager
VIA: Don D’Adam, Public Projects Director
Jeff Netzinger, Engineering Director
CC: Marc Orlando, ICMA-CM,Town Manager
DATE: April 28, 2026
SUBJECT: Beaufort County Update on William Hilton Parkway Gateway
Corridor Bridge Project
PURPOSE:
Assistant County Administrator Jared Fralix will provide an update on the status of the
William Hilton Parkway Gateway Corridor Bridge Project. He will also brief Town
Council on the Federal Highway Administration (FHWA) Large Bridge Grant application
and outline how a potential grant award would affect the project’s scope.
Although the bridge project and the William Hilton Parkway Corridor Master Plan are
separate initiatives, they function as interconnected components of the overall corridor
system. This presentation is intended to illustrate how the two efforts align and how the
corridor design incorporates the timing and scope of the bridge project.
BACKGROUND:
The current US278 bridge project scope focuses on replacing the eastbound bridge
entering Hilton Head Island. Beaufort County and SCDOT have jointly submitted an
application for the Federal Highway Administration’s Large Bridge Grant. If awarded,
this funding would allow the project scope to expand to include replacement of the
westbound bridge as well.
Page 2 of 77
Page 3 of 77
The purpose of the project is to eliminate
structural deficiencies and to provide new
bridge and roadway approaches that meet
current design standards
The purpose of this project is to address structural
deficiencies at the existing eastbound Mackay
Creek bridge and reduce congestion along US 278
from Moss Creek Drive to Spanish Wells Road
What’s the difference between the US 278 Eastbound Bridge
Replacement and the US 278 Corridor Improvements projects?
Pinckney Island National
Wildlife Refuge
Windmill
Harbour
Legend
US 278 Eastbound Bridge Replacement
US 278 Corridor Improvements
Mariners
Cove
C.C. Haigh
Jr. Boat
Landing Hog Island
As of October 2025
US 278 Eastbound Bridge Replacement
US 278 Corridor Improvements
What is the purpose of these
projects?
Where are these projects?
27
8
27
8
Page 4 of 77
What’s the difference between the US 278 Eastbound Bridge
Replacement and the US 278 Corridor Improvements projects?
As of October 23, 2025
US 278 Eastbound
Bridge
Replacement
US 278 Corridor
Improvements
This US 278 Eastbound Bridge Replacement project is just one part of a bigger vision. The full US 278 Corridor Improvements project is still a priority, and
SCDOT and Beaufort County are continuing to explore funding opportunities. The eastbound bridge replacement is moving forward now as a separate project—
and it’s being designed as a single, new bridge with two lanes and the potential to restripe to three lanes in the future if funding becomes available for the full
corridor.
Replacement of
the eastbound
bridges over
Mackay and Skull
Creek
Bicycle and
pedestrian
improvements
Traffic
improvements on
Hilton Head Island
Improved access to
Pinckney Island
Wildlife Refuge and
C.C. Haigh Jr. boat
landing
Maintained access
to Hog Island/
Mariners Cove
Does not impact
the Stoney
Community
Replacement of the
westbound bridges
over Mackay and
Skull Creeks
Projects
Proposed Improvements
Page 5 of 77
The eastbound bridge replacement would improve access to Pinckney Island and
the boat landing—just like many of you asked. What changes would you see?
Eastbound
Westbound
Improving Access to Pinckney Island
As of October 23, 2025
New ramp to access C.C. Haigh Jr. Boat Landing
and new loop road to access Pinckney Island
Wildlife Refuge
US 278 traffic limited to right-in and right-out access,
eliminating left turns while still providing access to
both the Pinckney Island Wildlife Refuge and the C.C.
Haigh Jr. Boat Landing from either direction
New local access road would loop under both
bridges to provide access to both the
C.C. Haigh Jr. Boat Landing and the
Pinckney Island Wildlife Refuge
Page 6 of 77
As of October 23, 2025
Eastbound Lane Configuration
10'
Shoulder
22'
Shoulder
12'
Travel Lane
12'
Travel Lane
12'
Future
Travel Lane
10'
Future
Shoulder
Page 7 of 77
Public Information
Meeting
October 30, 2025
WE
ARE
HERE! 2
Categorical Exclusion
(CE) Approval
Spring/Summer 2026
Finalize Design
Spring 2027
As of October 2025
2
Anticipated
Construction Letting
Winter 2027
2
Eastbound Bridge
Replacement Kick Off
Summer 2025
Schedule and Next Steps
Anticipated Project Schedule
What about US 278
Corridor Improvements?
SCDOT and Beaufort County can meet the
original timeline for replacement if we act now
What does this mean?
SCDOT and Beaufort County continue to
explore funding opportunities that could
bring the overall corridor improvements project
to construction. The US 278 Eastbound Bridge
Replacement would work with future corridor
improvements should funding become
available.
Subject to FHWA approval, construction is
anticipated to begin in early 2028
As of October 2025
Page 8 of 77
STAY
CONNECTED
info@SCDOT278BridgeReplacement.com
www.SCDOT278BridgeReplacement.com
Page 9 of 77
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Town Council
TO: Town Council
FROM: Shawn Gillen, Assistant Town Manager
VIA: Don D’Adam, Public Projects Director
Jeff Netzinger, Engineering Director
CC: Marc Orlando, ICMA-CM, Town Manager
DATE: April 28, 2026
SUBJECT: Review and Discussion of Proposed William Hilton Parkway Gateway
Corridor Master Plan
PURPOSE:
To present the proposed William Hilton Parkway Gateway Corridor Master Plan and
obtain Town Council policy direction to finalize the plan and advance public
engagement, funding, partnerships, and implementation.
BACKGROUND:
Since Town Council’s March 4, 2025 action approving the joint resolution with Beaufort
County regarding the project scope and funding strategy (Attachment 1), staff has
advanced a proposed draft William Hilton Parkway Gateway Corridor Master Plan
(Attachment 2).
This work builds upon prior Town Council direction and reflects regional alignment,
incorporates stakeholder input, and integrates the community values previously
established by Town Council.
The proposed plan prioritizes safety, mobility, community compatibility, and gateway
aesthetics, while maintaining alignment with regional infrastructure investments.
REQUEST FOR TOWN COUNCIL DIRECTION:
At this stage, staff is seeking Town Council feedback to confirm alignment with Town
Council priorities and to provide direction on advancing the plan into the next phase.
This includes final refinement of the plan, initiation of broader public engagement, and
development of a coordinated funding and implementation strategy.
NEXT STEPS:
Page 10 of 77
Page 2 of 2
Following Town Council direction, staff will advance the Master Plan, initiate public
engagement, continue coordination with partner agencies, and advance funding
strategies. A final master plan and implementation roadmap will be presented at an
upcoming Town Council Meeting for Town Council consideration.
ATTACHMENTS:
1. March 4, 2025 Town Council/Beaufort County Joint Resolution
2. Proposed Draft William Hilton Parkway Gateway Corridor Master Plan
Page 11 of 77
RESOLUTION 2025/15
A JOINT RESOLUTION OF BEAUFORT COUNTY & TOWN OF HILTON HEAD
ISLAND TO REDEFIN'E. THE US 278 CORRIDOR PROJECT (ALSO KNOWN AS THE
WILLIAM HILTON PARKWAY GATEWAY CORRIDOR PROJECT) TO ALIGN WITH
THE AVAILABLE FUNDING
WHEREAS, the current proposed 278 Corridor Project (also known as the William Hilton
Parkway Gateway Corridor Project includes a bridge with a multi-use
pathway and roadway improvements spanning from Moss Creek Drive to Spanish Wells Road;
and
WHEREAS, any Funds expended from the 2018 Referendum as per the referendum will
solely be expended within the originally project area from Moss Creek Drive to Squire
Pope Road, and funds spent for improvements between Squire Pope Road and Spanish Wells Road
will be sourced solely from Local Impact Fee Revenue; and
WHEREAS, the current available funding for the Project totals $298.85 million,
consisting of $101 million from Beaufort County (sales tax and impact fees), $3.35 million from
the Town of Hilton Head Island donations), $74.5 million from the South Carolina
Department of Transportation (SCDOT), and $120 million from the State Infrastructure Bank
(SIB); and
WHEREAS, in February 2024, SCDOT provided an updated Project cost estimate,
increasing the projected Project cost from $305 million to $488 million; and
WHEREAS, this updated Project cost estimate was in our following quarterly
report to the SIB, and upon receipt, the SIB requested a meeting with the County to address the
project status and funding shortfall; and
WHEREAS, at a meeting on May 29, 2024, between SIB, SCDOT, state representatives,
and Beaufort County, the County proposed a pro-rata cost-sharing arrangement between SIB,
SCDOT, and the County to cover the $190 million Project funding shortfall; and
WHEREAS, in a letter to SIB dated July 3, 2024, the County formally requested
$90 million from SIB to match a $90 million contribution from the County, contingent upon voter
approval of a proposed Transportation Sales Tax Referendum in November 2024; and
WHEREAS, on November 5, 2024, the Transportation Sales Tax Referendum did not
receive voter approval thereby rendering the proposed match unavailable; and
WHEREAS, on November 7, 2024, SIB issued a letter to the County requesting a response
within 15 days regarding the plan to address the $190M Project funding shortfall; and
WHEREAS, at its November 12, 2024, County Council meeting, the Council voted not to
allocate additional funds to the Project; and
Attachment 1
Page 12 of 77
WHEREAS, in a letter to Beaufort County dated November 18, 2024, SCDOT reiterated
the deteriorating condition of the eastbound Mackay Creek Bridge, stating that its current condition
is rated a 4 out of 10, and emphasized that a decision on a viable project must be made by March
31, 2025, to proceed with construction by 2027; and
WHEREAS, at the November 20, 2024, SIB meeting, an extension was granted to
Beaufort County until March 31, 2025, for the County to provide a revised funding plan for the
Project; and
WHEREAS, on January .9, 2025, Senator Tom Davis, with support from the state
delegation, presented a proposal to the Project to match available funding; and
WHEREAS, SCDOT has provided six project options along with cost estimates for each
option, including the proposal endorsed by Senator Tom Davis; and
WHEREAS, only two of the six options, (excluding the standalone Mackay Creek Bridge
replacement) fall within the available $298.85 million budget; and
WHEREAS, a joint meeting of the Beaufort County Council and the Hilton Head Town,
Council was held on February 12, 2025, to discuss the options for the Project presented by SCDOT
and the funding for the Project.
WHEREAS, in a February 28, 2025, letter from South Carolina Secretary of
Transportation Justin Powell, to Senator Tom Davis, if the projected proceeds, SCDOT will make
it a Project and is willing to include in the procurement documents and in the
scoring of new proposals, a preference for alternatives that provide two way access, meaning one
can exit from the New Bridge heading eastbound onto Pinckney Island as well as depart
Pinckney island on to the New Bridge to head eastbound to Jenkins Island, rather than the current
plan to provide access to Pinckney island solely from Jenkins Island, a copy of which is
incorporated by reference and attached as Exhibit B.
NOW THEREFORE, BE IT RESOLVED THAT THE COUNTY COUNCIL OF
BEAUFORT COUNTY, SOUTH CAROLINA, AND THE TOWN COUNCIL OF THE
TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA, hereby adopt arevised scope for
the Project to align with the available The revised Project includes the following elements:
Revised Project Scope:
1. * Demolition of the existing eastbound bridge over Mackay Creek, construction of a new
bridge extending from the mainland to Jenkins Island and retaining the
existing two lane eastbound bridge over Skull Creek and the two existing two lane
westbound bridges over Mackay Creek and Skull Creek* Construction of the New Bridge
will be a three-lane eastbound lifeline bridge without a pathway.
2. *
Striping the New Bridge for two lanes, with only necessary road tieuins included.
3. Designing the New Bridge width to accommodate temporary four-lane use in the future if
westbound bridge replacement is required.
4. * The New Bridge will be designed so that there is a preference to provide two-way access
to and from Pinckney Island from the New Bridge over the use of the existing Skull Creek
Page 13 of 77
bridge, either the eastbound or westbound lanes being repurposed for two-way access to
Pinckney Island.
*
Construction of a Hog Island connector road/bridge to provide access to Cove,Blue Heron Point, and Hog Island, linking back to US 278 at the Windmill Harborintersection.
*
Retention and improvement of the Windmill Harbor signal with mast arms.The Town of Hilton Head Island and Beaufort County agree to work cooperatively on the
following:
i. Transfer the maintenance and repair responsibilities of the Windmill Harbor
Signal to the Town of Hilton Head Island. Funding for mast arms and installation of
adaptive technology consistent with that installed on existing Town of Hilton HeadIsland Signals will be eligible for the use of Reserve Funds if they remain at the end ofthe bridge project.
it. Explore providing a bike/pedestrian lane on the new eastbound bridge structure, as partof the built third lane, until the third lane is needed for operations.ili. Request that SCDOT reduce the speed limit of the William Hilton Parkway Corridorto 40mph.
\
*These project elements are in attached as Exhibit A.
Funding Elements:
Funding Source Amount (in millions)Current Project Funding (SIB, DOT, Local) $295.50M
Additional SCDOT Funding (DOT, Local) $ 16.10 M
to Date (DOT,_LocalL_ S 13.07 MTotal Available Funding $298.53M
Planned Project Costs Amount (in millions)Revised Project Costs (SIB, DOT, Local) $257.70M
Remaining Engineering Costs (DOT, Local) $ 15.00M
Reserve Funds(Local) $ 14.33M
PSD Relocation Funds (Local) $ 6.50M
,Stoney Historic Cornnnmity SafeatLProjectsJLocal) $ 5.00M
Total Costs $298.53M
Use of Local Funds:
1. Reserve Funds will cover potential project overruns.
2, The Project will fund the replacement of the 24" waterline up to the limits inState Act 36, plus the allocated $6.5 million in Local Funds Costs for the waterline relocation not covered by combination of State Act 36 and Local Funds will befunded using Reserve Funds as the top priority.
3. To address immediate safety concerns in the Stoney Historic Community, a minimum of$5.0 million in Local Funds will be set aside and reserved for a local road project, withfunds made available upon approval of the Project by the Federal HighwayAdministration, with the Town overseeing design and construction, prioritized as follows:i. Squire Pope intersection enhancements (pedestrian safety, turn movements, etc.)ii. Sidewalk enhancements
Page 14 of 77
Adopted this 10th day of March 2025.
ATTEST;
ngaAw EMA
Adopted this 4th day of March 2025.
ATTEST:
'
berly Gammon, Clerk to Council
COUNTY COUNCIL OF BEAUFORT COUNTY
Alice Howard, Chair
HILTON HEAD ISLAND TOWN COUNCIL
Page 15 of 77
Retain existing 2-lane Weskbound as-is
/
$13
\_
Retain 2-lane Westbound
Page 16 of 77
EXHIBIT B
Justin P. Powell
Secretan/ of Transportation
South Carolina 808-737-0874 I 803-7372038 Fax
Department of Transportation
February 28, 2025
The Honorable Tom Davis
South Carolina Senate
203 Gressette Building
Columbia, SC 29201
Dear Senator Davis:
As you are aware, Beaufort County and the Town of Hilton Head Island are in discussions about revising the
US-278 Bridge project into a smaller project focused on the eastbound approach from Bluffton onto Hilton
Head Island.
The South Carolina Department of Transportation (SCDOT) has developed an alternative to build a single
span across Mackay Creek and Skull Creek. While designed forfuture capacity, the structure would be striped
fortwo lanes and would tie into the existing once on Hilton Head Island. This approach would address
SCDOT concerns about the US-278 eastbound bridge over Mackay Creek and advance a project that
facilitates the long~term plan to reconstruct all four bridges onto the island,
Consistent with the original proposal for the full bridge, the revised plan would aim to reduce the environmental
impacts to the Pinckney Island National Wildlife Refuge by not having the structure touch down on the island.
Given the budgetary constraints of funds available from Beaufort County, the State Infrastructure Bank, and
SCDOT, the current plan has public access to Pinckney Island solely from Hilton Head Island. Full access to
Bluffton from Pinckney Island would be established in the future when the westbound structures are replaced.
I recognize the concern about vehicles traveling from Bluffton to Pinckney Island will now be required to
travel to Hilton Head Island first. To that end, I want to offerthe following:
1) It the revised project proceeds, SCDOT will make it a build" project. In that process, SCDOT
will select a joint design and construction team to finalize plans on the project and build the bridge,
2) The design build process promotes innovation and allows teams to propose alternatives that can
improve the project. This could include proposing new ways to access Pinckney Island than currently
contemplated.
3) SCDOT is willing to include in the procurement documents and in the scoring of the proposals from
the teams a preference for alternatives that provide two-way access onto Pinckney Island than the
current plan to provide access solelytrom Hilton Head Island.
This approach will allow the project to proceed on its current budget and provide an opportunity to apply
additional innovation to the project that could resolve access concerns to Pinckney Island.
Please do not hesitate to reach out if I can be of further assistance,
Sincerely,
W
Justin P. Powell
Secre ary of Transportation
CC: Beaufort County Legislative Delegation
SCDOT Commission
www.scdot.org
An Equal Opportunity
Affirmative Action Employer
(8554672368)
Post Office Box 191
955 Park Street, Fioom 309
Columbia, SC 29202-0191
Page 17 of 77
William Hilton Parkway
Gateway Corridor Master Plan
TOWN OF HILTON HEAD ISLAND // APRIL 22, 2026
DRAFT
Page 18 of 77
page 03
page 04
page 06
page 20
page 21
page 25
page 40
page 44
| TABLE OF CONTENTS
Project Extent
Bridge Project Overview
Project Objective + Guiding Principals + Influences
Summary of Improvements
Jenkins Island Improvements
Stoney Neighborhood Improvements
-Squir e Pope Road /Chamberlin Drive Intersection
- Wild Horse Road / Spanish Wells Road Intersection
Old Wild Horse Corridor Improvements
Analysis
-P erformance Matrix
-Implemen tation Sequence
-Pr ojects Descriptions / Cost Estimates
- Additional Transportation System Improvement Projects
Page 19 of 77
Skull Creek
Mackay Creek
278
| PROJECT EXTENT + KEY ZONES
3
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Jenkins Island
Stoney Historic
Neighborhood CorridorCounty Bridge Project Extent
By BC/SCDOT
WHP Gateway Corridor Project Extent
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
Page 20 of 77
278
• Implement adaptive signal upgrades on US
Highway 278 to Interstate 95
• Design corridor enhancements from Moss
Creek to Mackay Creek Bridge
• Mitigate conditions of former gas station site
• Upgrade to adaptive signal systems on Bluffton
Parkway
• Relocate Pinckney Island Ferry Embarkation
OFF-ISLAND / WESTERN GATEWAY
1
2
3
4
5
31 2
4
5
Skull Creek
Mackay Creek
| BRIDGE PROJECT OVERVIEW
County Bridge Project Extent
By BC/SCDOT
4
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
Page 21 of 77
| BRIDGE PROJECT OVERVIEW
Future
New Off-Island Bridge
Bridge travel
direction to flip
New Bridge
(3 Lane Capacity)
New Bridge
(3 Lane Capacity)
Today
Existing Bridges
Bridge at end
of life span
Westbound
Westbound
Eastbound
Eastbound
Near-term
New On-Island Bridge
Westbound
Westbound
DemolishedDemolished
Demolished
Eastbound
Eastbound
Eastbound
Eastbound
Eastbound
Eastbound (Future)
Westbound
Westbound
Westbound
5
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Existing R/W Existing R/W Existing R/W
Existing R/W Existing R/W Existing R/W
Page 22 of 77
OBJECTIVE:
Develop a comprehensive William Hilton Parkway
Gateway Corridor Master Plan that will define the
future of U.S. 278
from the Moss Creek western
limits of the island through the historic Stoney
Community and across the island’s main gateway
CONSULTANT TEAM ROLE:
Use local knowledge to create community-based
solutions to enhance safety, community preservation,
and character
| MASTER PLAN OBJECTIVE
6
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 23 of 77
| CORRIDOR GUIDING PRINCIPLES
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
7
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
US 278 AT WILD HORSE ROAD / SPANISH WELLS ROAD
US 278 AT SQUIRE POPE ROAD / CHAMBERLIN DRIVE US 278 IN THE STONEY NEIGHBORHOOD
Page 24 of 77
| CORRIDOR GUIDING PRINCIPLES
Improve safety and quality of life for the
residents /neighborhoods / businesses directly
impacted by the corridor improvements
2
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
8
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
ESTABLISH A TRUE PARKWAY
ENHANCE PEDESTRIAN FACILITIES HONOR + CELEBRATE GULLAH GEECHEE CULTURE
Page 25 of 77
| CORRIDOR GUIDING PRINCIPLES
Create a gateway to Hilton Head Island that
the region will be proud of3
Improve safety and quality of life for the
residents /neighborhoods / businesses directly
impacted by the corridor improvements
2
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
9
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
CELEBRATE THE SALT MARSH AND ARRIVING ON THE ISLAND
CREATE NEW PUBLIC SPACE PRESERVE LOW COUNTRY CHARACTER
Page 26 of 77
Create a gateway to Hilton Head Island that
the region will be proud of
Improve hurricane / emergency
evacuation route
34
| CORRIDOR GUIDING PRINCIPLES
Improve safety and quality of life for the
residents /neighborhoods / businesses directly
impacted by the corridor improvements
2
1
Fix transportation issues in the corridor
to enhance safety and quality of life for all
residents, workers and visitors
10
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 27 of 77
278
278
Skull Creek
Mackay Creek
| 2024 SCDOT AVERAGE ANNUAL DAILY TRAFFIC VOLUMES
19,100
57,100
62,200
5,500
31,200
2,500
WHP Gateway Corridor Project Extent
50,400
7,100
32,900
10,600
278
11
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
*Average vehicles per day
both directions
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Page 28 of 77
Spanish Wells RdSpanish Wells Rd
Wild Horse RdWild Horse Rd Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
| 2024 SCDOT AVERAGE ANNUAL DAILY TRAFFIC VOLUMES
51.3%
48.7%
• Traffic trends show an increasing use
of the Cross Island Parkway with the
removal of the toll in 2021
• Traffic volumes are near balanced
between William Hilton Parkway and the
Cross Island Parkway
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
2010 2012 2014 2016 2018 2020 2022 2024 2026
Average Daily Traffic Volumes - 2011 - 2024
WHP Cross Island
278
WHP Gateway Corridor Project Extent
12
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
HONEY HORN HONEY HORN
PLANTATIONPLANTATION
Page 29 of 77
| PROJECT INFLUENCES
WHP Gateway Corridor Project Extent
13
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Most
Frequent
Least
Frequent
WHP GATEWAY CORRIDOR TRAFFIC COLLISIONS (2016-2024)
• Total Collisions - 1,108
• Total Fatalities - 6 (2 involving pedestrians)
• Total Major Injuries - 81
• Collisions at WHP/Squire Pope Rd & WHP/Wild Horse Rd
intersections make up more than 40% of all collisions
Skull Creek
Mackay Creek
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
Page 30 of 77
| CRASH DATA - SQUIRE POPE ROAD / CHAMBERLIN DRIVE
14
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Angle
Head On
Non-Collision
Rear End
Sideswipe, Same Direction
Unknown
Squire Pope Road Squire Pope Road
1
5
16
24
104
Time of Day
Severity
3
32
72
43
Minor Injury
Possible Injury
No Injury
Fatal
Serious Injury
6 AM – 12 PM
6 PM – 12 AM
12 AM – 6 AM
12 PM – 6 PM
278
Chamberlin Drive Chamberlin Drive
Page 31 of 77
| CRASH DATA - SQUIRE POPE ROAD / CHAMBERLIN DRIVE
DATA RANGE: 10/2018 - 06/2025
15
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Angle
Head On
Non-Collision
Rear End
Sideswipe, Same Direction
Unknown
Severity of Collision
Grand
Total
Sideswipe, Same
Direction
Rear
EndNon CollisionHead OnAngle
11Fatal
5113Serious Injury
16439Minor Injury
241014Possible Injury
1041561721No Injury
15015758448Grand Total
Manner of Collision
Grand TotalSideswipe, Same
DirectionRear EndNon CollisionHead OnAngleDriver Action
4112Under the Influence
66Disregarded Signs/Signals
871Improper Lane use/change
15132
Driving too Fast for
Conditions
29263Following too Closely
3112811Distracted/Inattention
4472431Failure to Yield RoW
150157584 48Grand Total
Probable Cause
0 5 10 15 20 25 30 35 40 45 50
Under the Influence
Disregarded Signs/Signals
Improper Lane use/change
Driving too Fast for Conditions
Following too Closely
Distracted/Inattention
Failure to Yield RoW
Page 32 of 77
| CRASH DATA SUMMARY - SQUIRE POPE ROAD / CHAMBERLIN DRIVE
• 50% of the reported crashes are rear-end crashes
• Angle crashes, typically a left-turn and through movement conflict,
make up 32% of the total crash types.
• The top three probable causes for crashes:
Distracted/Inattention (27%)
Failure to Yield ROW (24%)
Driving too fast for conditions (23%)
16
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 33 of 77
| CRASH DATA - SPANISH WELLS ROAD / WILD HORSE ROAD
17
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Angle
Head On
Non-Collision
Rear End
Sideswipe, Same Direction
Unknown
2 1
11
21
99
6
33
63
32
Time of Day
Severity
Minor Injury
Possible Injury
No Injury
Fatal
Serious Injury
6 AM – 12 PM
6 PM – 12 AM
12 AM – 6 AM
12 PM – 6 PM
Wild Horse RoadWild Horse Road
278
Spanish Wells Road Spanish Wells Road
Page 34 of 77
| CRASH DATA - SPANISH WELLS ROAD / WILD HORSE ROAD
18
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Angle
Head On
Non-Collision
Rear End
Sideswipe, Same Direction
Unknown
0 5 10 15 20 25 30
Disregarded Signs/Signals
Under the Influence
Improper Lane use/change
Following too Closely
Driving too Fast for Conditions
Failure to Yield RoW
Distracted/Inattention
Probable Cause
Manner of Collision
Grand
TotalUnknownSideswipe, Same
DirectionRear EndNon-CollisionHead OnAngleDriver Action
3111Other Improper Action
615Disregarded Signs/Signals
812113Under the Influence
11515Improper Lane use/change
14113Following too Closely
231913
Driving too Fast for
Conditions
2471115Failure to Yield RoW
273231Distracted/Inattention
13411863114 37Grand Total
Severity of Collision
Grand
TotalUnknownSideswipe, Same
DirectionRear EndNon-CollisionHead OnAngle
22Fatal
11Serious Injury
111217Minor Injury
211913 7
Possible
Injury
99116526123No Injury
13411863114 37Grand Total
DATA RANGE: 10/2018 - 06/2025
Page 35 of 77
19
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
| CRASH DATA SUMMARY - SPANISH WELLS ROAD / WILD HORSE ROAD
• 47% of the reported crashes are rear-end crashes
• Angle crashes, typically a left-turn and through movement conflict,
make up 28% of the total crash types.
• The top three probable causes for crashes:
Distracted/Inattention (27%)
Failure to Yield ROW (24%)
Driving too fast for conditions (23%)
Page 36 of 77
| SUMMARY OF IMPROVEMENTS
Enhance pedestrian pathways and create
better connectivity in corridor
Provide streetscape improvements
(landscape, medians, grading, signage, art)
Improve level of service and vehicular
thru-put at problematic intersections
Reconfigure Wild Horse Road / Spanish Wells
Road intersection to support continuous
on-island traffic flow
Reconfigure Squire Pope Road / Chamberlin
Drive intersection to support continuous
on-island traffic flow
Establish Gullah Geechee Heritage Park
Construct additional eastbound travel lane
Construct additional westbound travel lane
Page 37 of 77
JENKINS ISLAND
Page 38 of 77
Skull Creek
Mackay Creek
| JENKINS ISLAND KEY MAP
278
Jenkins Island
County Bridge Project Extent
By BC/SCDOT
22
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
Page 39 of 77
0
N
200'
300'
100'
PLANSCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
| JENKINS ISLAND - ROADWAY IMPROVEMENTS
Windmill Harbor
Harbor RV Resort
Hog Island
278
278
C Heinrichs Cir
Utility Corridor
Jenkins Rd
Hilton Head PSD #1
Jenkins Island Cemetery
Crosstree Dr
23
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Existing bridge alignment
Future bridge
alignment, by BC/SCDOT
New intersection mast arm Expanded median planting, convert
Jenkins Road to right-in right out
Access road and pathway
connection to Jenkins Road
(1) new eastbound lane, (1)
westbound lane in future phase
Access road and pathway connection
to Hog Island, by BC/SCDOT
Hilton Head Harbor Marina
Town Owned Property
Beaufort County Property
Beaufort County Property
Page 40 of 77
0
N
200'
300'
100'
PLANSCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
278
| JENKINS ISLAND - PEDESTRIAN IMPROVEMENTS
Jenkins Island Cemetery
Windmill Harbor
Harbor RV Resort
Hog Island
Hilton Head PSD #1
Hilton Head Harbor Marina
Landscape improvements between
bridge abutment and Windmill Harbor
278
278
C Heinrichs Cir
Utility Corridor
Jenkins Rd
Crosstree Dr
24
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Pathway connection under bridge
New pedestrian crossing
on south side of intersection
Trail-head park with parking and vehicular
access to Jenkins Island Cemetery
Pathways connecting
Jenkins Island to Stoney
Town Owned Property
Beaufort County Property
Beaufort County Property
Page 41 of 77
STONEY HISTORIC
NEIGHBORHOOD CORRIDOR
Page 42 of 77
Skull Creek
Mackay Creek
278
| STONEY HISTORIC NEIGHBORHOOD KEY MAP
Jenkins Island
County Bridge Project Extent
By BC/SCDOT
Moss Creek DrMoss Creek Dr
Spanish Wells RdSpanish Wells Rd
Squire Pope RdSquire Pope Rd
Wild Horse RdWild Horse Rd
Bluffton PkwyBluffton Pkwy
Gumtree RdGumtree Rd
Cross Island PkwyCross Island Pkwy
Chamberlin DrChamberlin Dr
Crosstree DrCrosstree Dr
C Heinrichs CirC Heinrichs Cir
Jenkins RdJenkins Rd
26
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Stoney Historic
Neighborhood Corridor
Page 43 of 77
0
N
200'
300'
100'
PLAN
SCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
| STONEY HISTORIC NEIGHBORHOOD - ROADWAY IMPROVEMENTS
278
27
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
WHP fly-over
Expanded median planting
Extension of Chamberlin Drive to Old Schoolhouse Park with new
connections to private parcels. Adrianna Lane access removed
Reconfigure intersection
to Continuous Green-T
(1) new eastbound lane, (1)
westbound lane in future phase
Streetscape enhancements
on Old Wild Horse Road
The Crazy Crab
Parkers
Tin and Tallow
GGHNCDC
Headquarters
GGHNCDC
future use
Fairfield Station
Connector between Wild Horse
Road and Old Wild Horse Road
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
Hilton Head Humane
Association
Humane Way
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
SCDOT
Extension of Chamberlin Drive to Humane Way + improvements
to Humane Way to connect to Spanish Wells Road
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Note: No right-of-way acquisition required in Stoney
Historic Neighborhood with proposed improvements
Page 44 of 77
0
N
200'
300'
100'
PLAN
SCALE: 1" = 200'-0"
TOWN-OWNED PROPERTIES
| STONEY HISTORIC NEIGHBORHOOD - PEDESTRIAN IMPROVEMENTS
278
28
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
The Crazy Crab
Parkers
Tin and Tallow
GGHNCDC
Headquarters
GGHNCDC
future use
New pedestrian bridge over WHP connecting
north Stoney to new Gullah Geechee Heritage Park
Additional park-space showcasing
Gullah Geechee heritage
New sidewalks on
Old Wild Horse Road
Fairfield Station
Humane Way
Pathways connecting
Jenkins Island to Stoney
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Hilton Head Humane
Association
SCDOT
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
Note: No right-of-way acquisition required in Stoney
Historic Neighborhood with proposed improvements
Page 45 of 77
SQUIRE POPE ROAD / CHAMBERLIN DRIVE
INTERSECTION ENLARGEMENT
Page 46 of 77
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Eastbound Continuous Green-T Improvements
30
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Continuous flow for
eastbound traffic
New pedestrian bridge for
north-south connection
Closure of thru-movement between Chamberlin
Drive and Squire Pope Road. Right-in, right-out only
Squire Pope RdSquire Pope Rd
Chamberlin Drive Chamberlin Drive
New connection into Old School House Park
and future Gullah Geechee Heritage Park
GREEN SHANI
MAIA
GREENBERGKING
LLC
LAM HUONG
THI
DRIESSEN
ALICE R.
PENA ADRIENNE
WASHINGTON WASHINGTON
ALYSIA T SAM DAVID GEORG
WRIGHT BETTY
MAULDIN EVELENA
WILLIAMS RUBY
SIMMONS DESAREE
WASHINGTON
AMANDA
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
GGHNCDC
HEADQUARTERS
PERRY
CLARENCE II
278
Page 47 of 77
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Eastbound Continuous Green-T Improvements
31
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Squire Pope Road
Chamberlin Drive
278
Page 48 of 77
| SQUIRE POPE ROAD / CHAMBERLIN DRIVE
Eastbound Continuous Green-T Improvements
32
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Squire Pope Road
Chamberlin Drive
278
Page 49 of 77
| PEDESTRIAN BRIDGE PRECEDENTS
33
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 50 of 77
SPANISH WELLS ROAD / WILD HORSE ROAD
INTERSECTION ENLARGEMENT
Page 51 of 77
| SPANISH WELLS ROAD /WILD HORSE ROAD
Baseline Improvements
New right turn lane +
designated thru-lane
New right turn lane +
designated thru-lane
35
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
ATLAS
SHRUGGED LLC
SCDOT
TIBERIUS HHI LLC
New Pathway crossing
Spanish Wells Road Spanish Wells Road
Wild Horse Road Wild Horse Road
New pathway into Old School House Park +
future Gullah Geechee Heritage Park
Old Schoolhouse Park
Town Owned Property
Additional left turn lane
TIN AND TALLOW
PARKERS
278
Page 52 of 77
| SPANISH WELLS ROAD /WILD HORSE ROAD
Baseline Improvements
36
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Spanish Wells Road
Wild Horse Road
278
Page 53 of 77
| SPANISH WELLS ROAD /WILD HORSE ROAD
Fly-over (Hybrid Cloverleaf Configuration)
Access roads to utilize
existing roadway alignments
Bridge with pathway
connection over WHP Connection to Wild Horse Road
Connection to Spanish Wells Road
Extension of Chamberlin Drive to
Humane Way + improvements to Humane
Way to connect to Spanish Wells Road
Connector between Wild Horse
Road and Old Wild Horse Road
37
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
CANNICK
LEANDER (LIFE
ESTATE) JR
DKD
REALITY INC
SPURLING
MARK
SCDOT
CTG RENTALS
LLC
FAIRFIELD
HORIZONTAL
PROPERTY
OWNERS REGIME
TIBERIUS
HHI LLC
Spanish Wells Road Spanish Wells Road
Humane WayHumane Way
Wild Horse Road Wild Horse Road
Old Wild Horse Road Old Wild Horse Road
Old Schoolhouse Park
JENKINS
ESQUIVEL &
FUENTES LLC
ROSA LEE
DRIESSEN TRUST
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
TIN AND TALLOW
Hilton Head Humane Association
PARKERS
278
Page 54 of 77
| SPANISH WELLS ROAD /WILD HORSE ROAD
Fly-over (Hybrid Cloverleaf Configuration)
38
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Spanish Wells Road
Humane Way
Wild Horse Road
278
Page 55 of 77
| FLY-THROUGH ANIMATION
LINK
Click on the link to the left to
view a flyover video of the
proposed project. If the link does
not redirect you to the video, try
updating your browser.
Page 56 of 77
OLD WILD HORSE ROAD
CORRIDOR IMPROVEMENTS
Page 57 of 77
| OLD WILD HORSE ROAD - DESIGN VISION
41
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Provide curb & gutter in-lieu of drainage ditch
Provide pathway connectivity on east side
of roadway to better serve businesses
Eliminate pathway inconsistencies Provide planting to improve aesthetic
Page 58 of 77
| OLD WILD HORSE ROAD - DESIGN VISION
42
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
New sidewalk, to meander where possible
Planted tree lawn buffer
New curb and gutter
Page 59 of 77
65'-0" FT RW
DRIVE
12'-0"
DRIVE
12'-0"
PATHWAY
8'-0"
DRAINAGE
+/-8'-0"
DRAINAGE
+/-25'-0"
65'-0" FT RW
DRIVE
10'-0"
DRIVE
10'-0"
PATHWAY
8'-0"
PLANTED
+/-8'-0"
PATHWAY
+/-8'-0"
2'-0" CURB + GUTTER
PLANTED
+/-8'-0"
TREE LAWN
+/-8'-0"
65'-0" FT RW
DRIVE
12'-0"
DRIVE
12'-0"
PATHWAY
8'-0"
DRAINAGE
+/-8'-0"
DRAINAGE
+/-25'-0"
65'-0" FT RW
DRIVE
10'-0"
DRIVE
10'-0"
PATHWAY
8'-0"
PLANTED
+/-8'-0"
PATHWAY
+/-8'-0"
2'-0" CURB + GUTTER
PLANTED
+/-8'-0"
TREE LAWN
+/-8'-0"
| OLD WILD HORSE ROAD - DESIGN VISION
PROPOSED STREET SECTION
EXISTING STREET SECTION
43
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 60 of 77
ANALYSIS
Page 61 of 77
| WILLIAM HILTON PARKWAY GATEWAY CORRIDOR MASTER PLAN
45
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Town Owned Property
Gullah Geechee Historic
Neighborhoods CDC Property
Page 62 of 77
| PERFORMANCE MATRIX
ELEMENT PERFORMANCE OPERATIONAL BENEFIT
3
3
8
4
8
8
4
2
9
Additional eastbound travel lane
(From bridge to Squire Pope Road)
Additional westbound travel lane
(From Squire Pope Road to Bridge)
Eastbound Continuous Green-T at
Squire Pope Rd / Chamberlin Dr
intersection + pedestrian bridge
Baseline improvements at
Spanish Wells Rd / Wild Horse Rd
intersection
Fly-over bridge at Spanish Wells
Rd / Wild Horse Rd intersection
INTERSECTION CORRIDOR
Reduces congestion during the AM peak hours. Delay for the
eastbound and side street movements will also be reduced
Reduces congestion during the PM peak hours. Delay for the
westbound and side street movements will also be reduced
Reduces WHP delay by creating continuous eastbound
movement. Reduces delay for westbound by removing frequency
of signal stops.
Provides congestion relief for the Spanish Wells Road and Wild
Horse Road approaches. WHP will see limited benefit from this
improvement.
WHP will benefit significantly as the majority of through-put
delay will be removed for eastbound movements. Westbound
delay will improve but will be controlled by future bridge
performance and other improvements to US 278
100 5
LITTLE CONGESTION RELIEF MODERATE CONGESTION RELIEF NO CONGESTION
10
Page 63 of 77
| PROJECTS
SCDOT
Project A
Project B
Project C
Project D
Project E
Project F
Project G
Project H
SCDOT / BC
PROJECT A
PROJECT B
PROJECT C
PROJECT D
PROJECT E
PROJECT F
PROJECT G
PROJECT H
47
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbor
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
Page 64 of 77
PROJECT DESCRIPTION ESTIMATED COST
$122,800,000SUB TOTAL
$4,200,000PROJECT A
(INTERSECTION - SHORT TERM IMPROVEMENT)
Implement baseline improvements at Spanish Wells Road and Wild
Horse Road intersection
$14,400,000PROJECT B
(INTERSECTION - SHORT TERM IMPROVEMENT)
Implement Eastbound Continuous Green-T at Squire Pope Road /
Chamberlin Drive intersection.
Construct pedestrian bridge west of Squire Pope Road / Chamberlin
Drive intersection
$5,700,000PROJECT C
(ROAD CONNECTION + PARK IMPROVEMENT)
Develop Gullah Geechee Heritage Park
Extend Chamberlin Drive to connect with Spanish Wells Road
$37,600,000PROJECT D
(ROAD EXPANSION + PATHWAY IMPROVEMENTS)
Construct an additional eastbound travel lane from bridge to Squire
Pope Road / Chamberlin Drive intersection
Implement corridor pathway, landscape, wayfinding, placemaking
improvements
$35,500,000PROJECT E
(INTERSECTIONS - LONG TERM IMPROVEMENT)
Construct Fly-over Bridge at Spanish Wells Road / Wild Horse Road
intersection.
Implement roundabouts at fly-over bridge connection points to WHP
$4,200,000PROJECT F
(STREETSCAPE IMPROVEMENT)
Implement Old Wild Horse Road streetscape enhancements
$7,800,000PROJECT G
(INTERSECTIONS - LONG TERM IMPROVEMENT)
Construct Jenkins Island access road, parking lots, cemetery
improvements
$13,400,000PROJECT H
(ROAD EXPANSION)
Construct additional westbound travel lane from Squire Pope /
Chamberlin intersection to bridge
| PROJECTS OVERVIEW
Page 65 of 77
| SCDOT/BC PROJECT
SCDOT / BC
SCDOT
49
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 66 of 77
| PROJECT A
ELEMENT COMPONENTS ESTIMATED COST
$4,200,000Baseline Improvements at Spanish
Wells / Wild Horse intersection
PROJECT A SUBTOTAL $4,200,000
• Additional pavement / turn
lane capacity
• Curb & gutter & drainage
• Pavement markings
• Landscaping
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
SCDOT / BC
PROJECT A
SCDOT
Project A
50
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 67 of 77
ELEMENT COMPONENTS ESTIMATED COST
$800,000
$13,600,000
Eastbound Continuous Green-T
at Squire Pope / Chamberlin
Intersection
Pedestrian Bridge
• 750’ bridge with decorative
handrails, lighting & finishes
• Deep foundations
• Steel superstructure
• Concrete deck
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
• Additional pavement / turn
lane capacity
• Raised concrete medians
• Pavement markings
• Curb & gutter & drainage
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
PROJECT B SUBTOTAL $14,400,000
| PROJECT B
SCDOT
SCDOT / BC
Project A
PROJECT A
Project B
PROJECT B
51
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbor
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 68 of 77
ELEMENT COMPONENTS ESTIMATED COST
$2,500,000
$3,200,000
Develop Gullah Geechee
Heritage Park
Extend Chamberlin Drive To
Spanish Wells Road
• Additional pavement
• Curb & gutter & drainage
• Pavement markings
• Landscaping
• Utility work
• Traffic control
• Pathways/ boardwalks
• Permeable parking area
• Shelter
• Site Lighting
• Landscaping
• Environmental graphics /
signage elements
• Utility work
PROJECT C SUBTOTAL $5,700,000
| PROJECT C
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project B
Project C
PROJECT C
52
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 69 of 77
ELEMENT COMPONENTS ESTIMATED COST
$20,100,000
$1,100,000
$16,400,000
Additional Eastbound Travel Lane
(Bridge to Squire Pope Road)
Windmill Harbor intersection
improvements
• Mast-arm pole replacement
• Pathway / curb ramp
adjustments
• Landscaping
• Utility work
• Traffic control
• Asphalt pathways
• Boardwalk structures
• Pavement markings
• Pathway signage
• Landscaping
• Utility work
• Traffic control
• Additional pavement
• Curb & gutter & drainage
• Pavement markings
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
PROJECT D SUBTOTAL $37,600,000
| PROJECT D
Corridor-wide pathway, landscape,
wayfinding, and placemaking
SCDOT
SCDOT / BC
Project A
PROJECT A
Project B
PROJECT B
Project C
PROJECT C
Project D
PROJECT D
53
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Page 70 of 77
ELEMENT COMPONENTS ESTIMATED COST
PROJECT E SUBTOTAL $35,500,000
$35,500,000Fly-over Bridge at Spanish Wells /
Wild Horse intersection
• Bridge with pathway,
handrails & lighting
• MSE walls
• Concrete retaining walls
• Curb & gutter & drainage
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
| PROJECT E
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project B
Project C
PROJECT C
Project D
PROJECT D
Project E
PROJECT E
54
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 71 of 77
| PROJECT F
Project B
ELEMENT COMPONENTS ESTIMATED COST
PROJECT F SUBTOTAL $4,200,000
$4,200,000Old Wild Horse Road Improvements
• Curb & gutter & drainage
• Asphalt pathways
• Pavement markings
• Landscaping
• Utility work
• Traffic control
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project C
PROJECT C
Project D
PROJECT D
Project E
PROJECT E
Project F
PROJECT F
55
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 72 of 77
| PROJECT G
ELEMENT COMPONENTS ESTIMATED COST
PROJECT G SUBTOTAL $7,800,000
$7,800,000Jenkins Island Access Road,
Parking, Cemetery Park
• Additional pavement
• Curb & gutter & drainage
• Pavement markings
• Landscaping
• Park improvements
• Utility work
• Traffic control
• Parking lots
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project B
Project C
PROJECT C
Project D
PROJECT D
Project E
PROJECT E
Project F
PROJECT F
Project G
PROJECT G
56
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Page 73 of 77
| PROJECT H
ELEMENT COMPONENTS ESTIMATED COST
$13,400,000Additional Westbound Travel Lane
(Squire Pope Road to Bridge)
• Additional pavement
• Curb & gutter & drainage
• Pavement markings
• Landscaping + signage
• Pathway / curb ramp
adjustments
• Utility work
• Traffic control
PROJECT H SUBTOTAL $13,400,000
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project B
Project C
PROJECT C
Project D
PROJECT D
Project E
PROJECT E
Project F
PROJECT F
Project G
PROJECT G
Project H
PROJECT H
57
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbor
Hog Island
Old Schoolhouse Park
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Page 74 of 77
| FULL PROJECT BUILD OUT
ESTIMATED COST
$122,800,000
SCDOT
SCDOT / BC
Project A
PROJECT A
PROJECT B
Project B
Project C
PROJECT C
Project D
PROJECT D
Project E
PROJECT E
Project F
PROJECT F
Project G
PROJECT G
Project H
PROJECT H
58
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
C Heinrichs Cir
Jenkins Rd
278
278
Old Wild Horse Rd
Spanish Wells Rd
Squire Pope Road
Chamberlin Drive
Wild Horse Rd
Windmill Harbor
Hog Island
Stoney Historic Neighborhood
Jenkins Island
Jarvis Creek
Old Schoolhouse Park
Page 75 of 77
| ADDITIONAL TRANSPORTATION SYSTEM IMPROVEMENT PROJECTS
Gumtree Road Intersection
Gumtree Road Improvements at Bus Drive and School Drive
Wilborn Road Intersection
Wilborn Road Improvements at Bus Drive and School Drive
Main Street Improvements
Palmetto Bay Road Improvements at Arrow Road / Point Comfort Road
Sea Pines Circle Improvements
59
TOWN OF HILTON HEAD ISLAND, SC | 04-22-2026WILLIAM HILTON PARKWAY GATEWAY CORRIDOR | MASTER PLAN DRAFT
Page 76 of 77
THANK YOU!
Page 77 of 77