RecordWell Data

Agenda

City of Isle of Palms · Charleston County · meeting of Oct 1, 2026 · Agenda packets

Open the original document More from City of Isle of Palms

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Beach Preservation Committee 9:00 a.m., Thursday, October 1, 2026 1207 Palm Boulevard City Hall Council Chambers Public Comment: All citizens who wish to speak during the meeting must email their first and last name, address and topic to Nicole DeNeane, City Clerk, at nicoled@isleofpalms.gov no later than 3:00 p.m. the day before the meeting. Citizens may also provide written public comment here: https://www.isleofpalms.gov/public-comment-form A genda 1. Call to order and acknowledgment that the press and the public have been duly notified of the meeting in accordance with the Freedom of Information Act. 2. Citizens’ comments- All comments have a time limit of three (3) minutes. 3. Approval of Minutes- September 2, 2026 4. New Business- a. Discussion of alternatives analysis presentation (9:00am) b. Discussion and recommendation of future RFP for terminal groin and shoal management feasibility, design, permitting, and construction administration (9:15am) c. Discussion and recommendation on future dune vegetation and fencing (9:30am) d. Discussion of information to be included in future beach monitoring reports (9:45am) 5. Old Business- Update on beach renourishment project (10:00am) 6. Miscellaneous Business- Next meeting: Thursday, November 5, 2026 at 9am 7. Adjournment City of Isle of Palms Beach Preservation Committee Beach Management Alternatives Analysis – Findings Discussion September 2, 2026 Page 2 ◆ Recap of Study Baseline Definition ◆ Summary of Assumed Initial Conditions ▪ Volume Change Rates ▪ 2026 Project ◆ Alternatives ◆ Cost Analysis - Assumptions and Results ◆ Future Management Outline Page 3 ◆ Baseline Development: ▪ Assumed to represent the primary dune crest of minimum beach position ▪ Identified as the seaward-most occurrence of: • 50-ft offset from seaward edge of development, • 2017 SCDES Baseline, or • Seaward edge of 2026 dune, where constructed. Alternatives Study Baseline Definition Page 4 Alternatives Study Baseline Definition Development Line (estimated) 2017 SCDES 2026 Dune 50-ft (min.) ~175 to 200-ft The “baseline” is assumed to be the primary dune crest that is identified by the seaward most occurrence of; (1) 50-ft seaward of development line, (2) the 2017 SCDES line, or (3) the seaward edge of the 2026 constructed dune. MHHW Page 5 Alternatives Study Baseline Definition Study Baseline Seaward Edge of Infrastructure (typ.) 50-ft Seaward of Seaward Edge of Infrastructure (typ.) 2017 SCDES Baseline 2026 Dune Beach Monitoring Stations Atlantic Ocean Breach Inlet Page 6 Alternatives Study Baseline Definition Seaward Edge of Infrastructure (typ.) Study Baseline 50-ft Seaward of Seaward Edge of Infrastructure (typ.) 2017 SCDES Baseline 2026 Dune Beach Monitoring Stations Page 7 Page 7 Initial Conditions Page 8 Volume Change Rates “Low Rate” Survey Period: April 2018 – September 2024 “High Rate” Survey Period: July 2021 – September 2024 Note: Volume change rates were derived from volume data reported by CSE. Page 9 Volume Change Rates (Reach 1) Note: Volume change rates were derived from volume data reported by CSE. Volume change data used for Alternatives Analysis Page 10 Volume Change Rates (Reach 5) Note: Volume change rates were derived from volume data reported by CSE. Volume change data used for Alternatives Analysis Page 11 NET Volume Change Rates (Reaches 1-6) Note: Volume change rates were derived from volume data reported by CSE. April 2018 - September 2024 ("low") July 2021 - September 2024 ("high") Reach 1 4,000 -36,800 -96,200 Reach 2 5,000 -22,300 -32,900 Reach 3 5,000 20,500 25,600 Reach 4 8,200 82,000 53,200 Reach 5 5,800 -141,900 -108,400 Reach 6 4,800 -102,200 -95,700 Total All Reaches 32,800 -200,700 -254,400 Total Reaches 1, 2, 5, & 6 19,600 -303,200 -333,200 Reach Length (ft) Annualized Volume Change Rate (cy/yr) Reach Page 12 2026 Project Volumes Based on June. 2026 Survey 800,700 cy 799,100 cy 880,100 cy Page 13 Post-2026 Beach Conditions (Projected) This is the starting condition for the alternatives analysis Based on June. 2026 Survey Page 14 Page 14 Alternatives Page 15 Alternatives ◆ No-Action (“Do Nothing”) ◆ Beach Renourishment Only (Low and High Sand Loss Rates) ▪ Scheduled (5-yr, 7-yr, and 10-yr intervals) ▪ Triggered (Interval Required to Protect Baseline Condition) ◆ USACE Breach Inlet ICWW Maintenance – Reach 1 (150,000 cy every 3 yrs) ◆ Dewees Inlet Shoal Management – Reaches 5 and 6 (700,000 cy every 7 yrs) ◆ Terminal Groin (R1) ◆ T-Groins/Breakwaters and/or Geotubes (R5/R6) – Reaches 5 and 6 (last line of defense) Page 16 No Action (Low Sand Loss Rate) Note: Does not consider possible future AICWW beach disposal. Page 17 No Action (High Sand Loss Rate) Note: Does not consider possible future AICWW beach disposal. Page 18 2026 Project Performance Assuming recent beach change conditions continue, the 2026 Project is expected to maintain beach conditions seaward of the entire assumed beach management Baseline for no more than about 3 years. Page 19 [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) Volume Lost Seaward of Baseline (cy) Volume Lost Landward of Baseline (cy) Total Volume Lost (cy) 1 122,300 61,500 183,800 245,300 158,300 322,800 481,100 803,900 2 111,400 0 111,400 111,400 164,300 0 164,300 164,300 3 0 0 0 0 0 0 0 0 4 0 0 0 0 43,400 0 43,400 43,400 5 664,200 45,000 709,200 754,200 564,800 28,500 593,300 621,800 6 503,700 7,500 511,200 518,700 591,100 126,500 717,600 844,100 Total 1,401,600 114,000 1,515,600 1,629,600 1,521,900 477,800 1,999,700 2,477,500 Predicted Preformance of 2026 Project after 5 Years [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Predicted Preformance of 2026 Project after 5 Years Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) 5-Year Project Interval after Completion of 2026 Project [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Renourishment - Scheduled ◆ Required Future Volume Following Completion of 2026 Project ▪ Restore Minimum AND Maintain Baseline Beach Condition ▪ Future Advance Fill required for 5-, 7-, and 10-year renourishment intervals Page 20 [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) 1 158,300 209,200 367,500 576,700 158,300 804,000 962,300 1,766,300 2 222,800 0 222,800 222,800 262,600 66,000 328,600 394,600 3 0 0 0 0 0 0 0 0 4 0 0 0 0 86,800 0 86,800 86,800 5 885,300 533,300 1,418,600 1,951,900 741,500 445,000 1,186,500 1,631,500 6 865,800 156,600 1,022,400 1,179,000 761,700 673,600 1,435,300 2,108,900 Total 2,132,200 899,100 3,031,300 3,930,400 2,010,900 1,988,600 3,999,500 5,988,100 Predicted Preformance of 2026 Project after 10 Years [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Predicted Preformance of 2026 Project after 10 Years 10-Year Project Interval after Completion of 2026 Project April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) Reach [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) 1 146,300 110,900 257,200 368,100 158,300 515,300 673,600 1,188,900 2 155,900 0 155,900 155,900 218,900 11,000 229,900 240,900 3 0 0 0 0 0 0 0 0 4 0 0 0 0 60,800 0 60,800 60,800 5 816,100 176,900 993,000 1,169,900 675,900 154,700 830,600 985,300 6 674,300 41,400 715,700 757,100 715,100 289,600 1,004,700 1,294,300 Total 1,792,600 329,200 2,121,800 2,451,000 1,829,000 970,600 2,799,600 3,770,200 Predicted Preformance of 2026 Project after 7 Years [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) April 2018 - September 2024 ("Low" Erosion Rate) 7-Year Project Interval after Completion of 2026 Project July 2021 - September 2024 ("High" Erosion Rate) Reach Predicted Preformance of 2026 Project after 7 Years Renourishment - Scheduled Page 21 [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) 1 97,300 13,000 110,300 123,300 88,100 8,100 96,200 104,300 2 66,800 0 66,800 66,800 32,900 0 32,900 32,900 3 0 0 0 0 0 0 0 0 4 0 0 0 0 8,700 0 8,700 8,700 5 418,500 7,100 425,600 432,700 118,700 0 118,700 118,700 6 306,700 0 306,700 306,700 141,700 1,900 143,600 145,500 Total 889,300 20,100 909,400 929,500 390,100 10,000 400,100 410,100 Predicted Preformance of 2026 Project after 3 Years Predicted Preformance of 2026 Project after 1 Year[D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Trigger - 3 Years Until Erosion into Baseline [Between Stations 12+00 and 30+00] Trigger - 1 Year Until Erosion into Baseline [Between Stations 12+00 and 30+00] Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) Renourishment - Triggered ◆ Implement renourishment on scheduled intervals regardless of beach condition between intervals Page 22 Breach Inlet AICWW Beach Disposal Note: Concept only. Goals: • Beneficial use of available dredge material • Supplemental sand source for Reaches 1 and 2 • Extend time between required renourishments • Reduce sand need from offshore borrow areas Assumptions: • 3 yr interval (more or less) • ~150,000 cy/event (equivalent to ~50,000 cy/yr) • All material placed in Reaches 1 and 2 • Available material is suitable for beach placement • Material provided at no cost to the City Reach 2Reach 1 Atlantic Intracoastal Waterway (AICWW) Page 23 Dewees Inlet Shoal Management Note: Concept only. Goals: • Collect ebb shoal sand before migrating shoals approach IOP shoreline • Place sand along Reaches 5 and 6 • Reduce impacts of future shoal attachments • Extend time between required renourishments • Reduce sand need from offshore borrow areas Assumptions: • 7 yr interval • 700,000 cy/event (equivalent to 100,000 cy/yr) • All material placed in Reaches 5 and 6 Page 24 [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) 1 122,300 61,500 183,800 245,300 106,700 158,300 322,800 481,100 803,900 718,200 2 111,400 0 111,400 111,400 0 164,300 0 164,300 164,300 0 3 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 43,400 0 43,400 43,400 0 43,400 5 664,200 45,000 709,200 754,200 504,200 564,800 28,500 593,300 621,800 371,800 6 503,700 7,500 511,200 518,700 268,700 591,100 126,500 717,600 844,100 594,100 Total 1,401,600 114,000 1,515,600 1,629,600 750,000 879,600 1,521,900 477,800 1,999,700 2,477,500 750,000 1,727,500 5-Year Project Interval after Completion of 2026 Project Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) 250,000 500,000 250,000 500,000 Renourishment – with AICWW and Shoal Mgt Sand [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) 1 146,300 110,900 257,200 368,100 174,000 158,300 515,300 673,600 1,188,900 1,079,800 2 155,900 0 155,900 155,900 0 218,900 11,000 229,900 240,900 0 3 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 60,800 0 60,800 60,800 0 60,800 5 816,100 176,900 993,000 1,169,900 819,900 675,900 154,700 830,600 985,300 635,300 6 674,300 41,400 715,700 757,100 407,100 715,100 289,600 1,004,700 1,294,300 944,300 Total 1,792,600 329,200 2,121,800 2,451,000 1,050,000 1,401,000 1,829,000 970,600 2,799,600 3,770,200 1,050,000 2,720,200 Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) 700,000 350,000 700,000 350,000 7-Year Project Interval after Completion of 2026 Project Page 25 Renourishment – with AICWW and Shoal Mgt Sand ◆ Demand on offshore sand can be reduced with use of beach compatible sand from AICWW and Dewees Inlet Shoal Management. ◆ Proposed sand volume from AICWW beach disposal MAY NOT be sufficient to maintain Baseline conditions along Reach 1 without sand from offshore. ◆ Available volumes and schedule will need to be confirmed. [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) 1 158,300 209,200 367,500 576,700 299,500 158,300 804,000 962,300 1,766,300 1,660,900 2 222,800 0 222,800 222,800 0 262,600 66,000 328,600 394,600 0 3 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 86,800 0 86,800 86,800 0 86,800 5 885,300 533,300 1,418,600 1,951,900 1,451,900 741,500 445,000 1,186,500 1,631,500 1,131,500 6 865,800 156,600 1,022,400 1,179,000 679,000 761,700 673,600 1,435,300 2,108,900 1,608,900 Total 2,132,200 899,100 3,031,300 3,930,400 1,500,000 2,430,400 2,010,900 1,988,600 3,999,500 5,988,100 1,500,000 4,488,100 10-Year Project Interval after Completion of 2026 Project Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) 500,000 1,000,000 500,000 1,000,000 Page 26 Renourishment with Structures ◆ Terminal Groin (Reach 1) Page 27 7-Year Condition Volume Loss Beyond Baseline (typ.) Post-Project Beach Volume Performance Relative to Baseline “Low” rate (2018-2024) “High” rate (2021-2024) Anticipated Sand Loss Landward of Baseline (Reach 1) Page 28 Reach 1 Reach 2 6th Avenue Area of Highest Erosion and Volume Loss (typ.) Beach Monitoring Stations Pier 14th Avenue Anticipated Sand Loss Landward of Baseline (Reach 1) Page 29 Reach 1 Reach 2 6th Avenue Terminal Groin (~1,200 ft) Concept shoreline response 14th Avenue Pier Goals: • Reduce sand loss from the southern end of the island • Anchor shoreline position away from Baseline • Extend time between required renourishment events • Reduce demand on sand from offshore borrow areas Assumptions: • ~1,200 feet long (most of structure to be buried) • ~15,000 tons of rock (with stone-filled mattress foundation) • Reduces sand loss: • Reach 1 by 50% • Reach 2 by 25% Terminal Groin (Reach 1) Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed. Page 30 Renourishment with Structures ◆ Terminal Groin (Reach 1) ◆ T-Groins/Breakwaters (Reaches 5 and 6) Page 31 7-Year Condition Volume Loss Beyond Baseline (typ.) Post-Project Beach Volume Performance Relative to Baseline “Low” rate (2018-2024) “High” rate (2021-2024) Anticipated Sand Loss Landward of Baseline (Reaches 5 &6) Page 32 Area of Highest Erosion (typ.) Wild Dunes Resort Anticipated Sand Loss Landward of Baseline (Reaches 5 &6) Page 33 T-Groins and Breakwaters (Reaches 5 and 6) Breakwater (typ.) T-groin (typ.) Wild Dunes Resort Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed. Goals: • Provide last line of defense to upland • Anchor shoreline position at Baseline under most eroded conditions • Maintain recreational beach seaward of Baseline Note: Not intended to reduce sand loss rate from renourishment but may allow for smaller fill volumes and longer periods between renourishments Assumptions: • Reach 5 (5, T-groins and 2, breakwaters) • Reach 6 (2, T-groins and 2, breakwaters) • T-Groin = 2,800 tons with foundation • Breakwater = 1,600 tons with foundation Page 34 Renourishment with Structures ◆ Terminal Groin (Reach 1) ◆ T-Groins/Breakwaters (Reaches 5 and 6) ◆ Sand filled Geotubes (Reaches 5 and 6) Page 35 Geotubes (Reaches 5 and 6) Geotubes (typ.) Wild Dunes Resort Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed. Goals: • Provide last line of defense to upland • Anchor shoreline position at Baseline under most eroded conditions Note: Not intended to maintain recreational beach seaward of Baseline Assumptions: • Reach 5 = 3,300 feet • Reach 6 = 1,700 feet Page 36 Beach Management Elements Summary Note: Concept. Does not represent a final design. Renourishment Renourishment AICWW Beach Disposal Dewees Inlet Shoal Mgt T-Groins/ Breakwaters or Geotubes Offshore Borrow Areas Reach 2Reach 1 Reach 5 Reach 6 Terminal Groin Page 37 Known Offshore Sand Sources Sand Availability: no more than ~25 Mcy (pre-2026) (ref: CSE) ◆ Depleted: A, B, C, F ◆ Partially Depleted: E ◆ Available: D, G ◆ 2026 Project: Area 1 ◆ Future: Area 2-5 Sand Demand: Planning Period (yrs) Total Sand Demand (cy) Total Sand Demand with 20% Contingency (cy) Low 303,000 50 15,150,000 18,200,000 High 400,000 50 20,000,000 24,000,000 Annual Sand Loss (cy/yr) Page 38 ◆ Offshore sand for continued renourishment ▪ Mob/Demob = $1.5M ▪ Sand = $9/cy (ref: recent Marinex proposal to City of IOP) ▪ As needed ◆ Dewees Inlet Shoal Management ▪ Mob/Demob = $1.0M (assumed) ▪ Sand = $7.5/cy (assumed) ▪ 700,000 cy every 7 years (equivalent to 100,000 cy/yr – Reaches 5 and 6 only) ◆ Breach Inlet AICWW Beach Disposal ▪ No cost to the City of IOP (ref: communications between USACE and City of IOP) ▪ 150,000 cy every 3 years (equivalent to 50,000 cy/yr – Reaches 1 and 2 only) Cost Assumptions - Sand Page 39 ◆ Rock - Effective unit cost = $275/ton (recent market conditions in SC & NC) ▪ Terminal Groin (Reach 1) ~$4.5 to $5.5M ▪ T-Groins/Breakwaters (Reach 5) ~$4 to $5M ▪ T-Groins/Breakwaters (Reach 6) ~$3.5 to $4M ◆ Geotubes – Effective unit cost = $570/ft (recent market conditions in NC) Cost Assumptions - Structures Page 40 ◆ Planning, Engineering, and Design (PED) = 5% of construction cost ◆ Const. Engr and Inspection (CEI) = 7% of construction cost ◆ Contingency = 0% (Note: The assumed costs are based upon proposals from industry and recent market examples, so no contingency is applied to costs.) ◆ Planning period (n) = 50 years ◆ Discount rate (i) = 3.25% (2026 USACE planning guidance) Cost Assumptions - Other Page 41 Cost Summary (preliminary) Scheduled Renourishment (offshore sand sources only; baseline condition rebuilt at time of each event) Triggered Renourishment (offshore sand sources only) Future Renourish- ment Event Volume (cy) Future Renourish- ment Event Cost ($) Supplemental Volume from Dewees Inlet and AICWW (cy) Dewees Inlet Shoal Mgt ($) Breach Inlet AICWW Beach Disposal ($) Terminal Groin (Rch 1) ($) Average Annual Equivalent Cost (AAEC) ($/yr) 5-Yr Interval (Low) 1,629,600 18,106,368$ - -$ -$ -$ 6,344,300$ 5-Yr Interval (High) 2,477,500 26,653,200$ - -$ -$ -$ 9,273,300$ 7-Yr interval (Low) 2,451,000 26,386,080$ - -$ -$ -$ 6,457,800$ 7-Yr Interval (High) 3,770,200 39,683,616$ - -$ -$ -$ 9,636,800$ 10-Yr Interval (Low) 3,930,400 41,298,432$ - -$ -$ -$ 7,116,900$ 10-Yr Interval (High) 5,988,100 62,040,048$ - -$ -$ -$ 10,612,500$ Alternative Scheduled Renourishment Future Renourish- ment Event Volume (cy) Future Renourish- ment Event Cost ($) Supplemental Volume from Dewees Inlet and AICWW (cy) Dewees Inlet Shoal Mgt ($) Breach Inlet AICWW Beach Disposal ($) Terminal Groin (Rch 1) ($) Average Annual Equivalent Cost (AAEC) ($/yr) Trigger (Low) 3-Yr Interval 909,400 10,846,752$ - -$ -$ -$ 6,151,300$ Trigger (High) 1-Yr Interval 400,100 5,713,008$ - -$ -$ -$ 9,923,100$ Triggered Renour- ishment Alternative Note: “Future nourishment event volume and “cost” applies to all renourishments after first event. The volume of the first renourishment event is increased to offset initial losses landward of Baseline. Page 42 Cost Summary (preliminary) Renourishment supplemented with AICWW Beach Disposal and Dewees Shoal Mgt Renourishment supplemented with AICWW Beach Disposal and Dewees Shoal Mgt and Terminal Groin Note: “Future nourishment event volume and “cost” applies to all renourishments after first event. The volume of the first renourishment event is increased to offset initial losses landward of Baseline. Future Renourish- ment Event Volume (cy) Future Renourish- ment Event Cost ($) Supplemental Volume from Dewees Inlet and AICWW (cy) Dewees Inlet Shoal Mgt ($) Breach Inlet AICWW Beach Disposal ($) Terminal Groin (Rch 1) ($) Average Annual Equivalent Cost (AAEC) ($/yr) 5-Yr (Low) 765,600 9,397,248$ 750,000 5,320,000$ -$ -$ 5,228,200$ 5-Yr (High) 1,249,700 14,276,976$ 750,000 5,320,000$ -$ -$ 7,045,200$ 7-Yr (Low) 1,071,800 12,483,744$ 1,050,000 7,000,000$ -$ -$ 4,937,000$ 7-Yr (High) 1,749,600 19,315,968$ 1,050,000 7,000,000$ -$ -$ 6,822,300$ Alternative AICWW and Dewees Inlet Mgt Future Renourish- ment Event Volume (cy) Future Renourish- ment Event Cost ($) Supplemental Volume from Dewees Inlet and AICWW (cy) Dewees Inlet Shoal Mgt ($) Breach Inlet AICWW Beach Disposal ($) Terminal Groin (Rch 1) ($) Average Annual Equivalent Cost (AAEC) ($/yr) ALL 5-yr (Low) 720,000 8,937,600$ 750,000 5,320,000$ -$ 4,620,000$ 5,232,200$ ALL 5-yr (High) 925,000 11,004,000$ 750,000 5,320,000$ -$ 4,620,000$ 6,062,300$ ALL 7-yr (Low) 1,008,000 11,840,640$ 1,050,000 7,000,000$ -$ 4,620,000$ 4,925,800$ ALL 7-yr (High) 1,295,000 14,733,600$ 1,050,000 7,000,000$ -$ 4,620,000$ 6,818,600$ ALL Elements (Reaches 1, 5, and 6) Alternative Details provided on next slide Page 43 Example of Event Cost and 50-yr Cost Stream for Computation of AAEC (preliminary) Item Quantity Unit Cost Units Total Dredge Mob/Demob 1 1,500,000.00$ LS 1,500,000.00$ Sand 1,227,000 9.00$ cy 11,043,000.00$ 12,543,000.00$ 5% 627,150.00$ 7% 878,010.00$ 14,048,160.00$ 0% -$ 14,048,160.00$ Item Quantity Unit Cost Units Total Dredge Mob/Demob 1 1,500,000.00$ LS 1,500,000.00$ Sand 1,008,000 9.00$ cy 9,072,000.00$ 10,572,000.00$ 5% 528,600.00$ 7% 740,040.00$ 11,840,640.00$ 0% -$ 11,840,640.00$ Item Quantity Unit Cost Units Total Terminal Groin 15,000 275.00$ tons 4,125,000.00$ 4,125,000.00$ 5% 206,250.00$ 7% 288,750.00$ 4,620,000.00$ 0% -$ 4,620,000.00$ Item Quantity Unit Cost Units Total Dredge Mob/Demob 1 1,000,000.00$ LS 1,000,000.00$ Sand 700,000 7.50$ cy 5,250,000.00$ 6,250,000.00$ 5% 312,500.00$ 7% 437,500.00$ 7,000,000.00$ 0% -$ 7,000,000.00$ Contingency Total Restore Baseline and Replace Advance Fill with First Renourishment subtotal Construction PED/Permitting CEI/Monitoring subtotal Project CEI/Monitoring subtotal Project Contingency Total Dewees Shoal Dredging subtotal Construction PED/Permitting Total Terminal Groin subtotal Construction PED/Permitting CEI/Monitoring subtotal Project Contingency Total Contingency Future Maintenance (Normal Advance Fill after First Renourishment) subtotal Construction PED/Permitting CEI/Monitoring subtotal Project Total Cost Renourisment Offshore Sand and Monitoring Terminal Groin Dewees Shoal Mgt Cost Escolation Factor Renourisment Offshore Sand and Monitoring Terminal Groin Dewees Shoal Mgt Renourisment Offshore Sand and Monitoring Terminal Groin Dewees Shoal Mgt Present Worth Cost 0 2026 -$ -$ -$ -$ 1260.04 -$ -$ -$ -$ -$ -$ -$ 1 2027 100,000$ 100,000$ 1292.80 102,600$ -$ -$ 99,400$ -$ -$ 99,400$ 2 2028 4,720,000$ 100,000$ 4,620,000$ 1326.42 105,268$ 4,863,386$ -$ 98,700$ 4,562,000$ -$ 4,660,700$ 3 2029 100,000$ 100,000$ 1360.90 108,005$ -$ -$ 98,100$ -$ -$ 98,100$ 4 2030 100,000$ 100,000$ 1396.29 110,813$ -$ -$ 97,500$ -$ -$ 97,500$ 5 2031 100,000$ 100,000$ 1432.59 113,694$ -$ -$ 96,900$ -$ -$ 96,900$ 6 2032 100,000$ 100,000$ 1469.84 116,650$ -$ -$ 96,300$ -$ -$ 96,300$ 7 2033 21,048,160$ 14,048,160$ 7,000,000$ 1508.05 16,813,218$ -$ 8,377,790$ 13,440,700$ -$ 6,697,300$ 20,138,000$ 8 2034 100,000$ 100,000$ 1547.26 122,795$ -$ -$ 95,100$ -$ -$ 95,100$ 9 2035 100,000$ 100,000$ 1587.49 125,987$ -$ -$ 94,500$ -$ -$ 94,500$ 10 2036 100,000$ 100,000$ 1628.77 129,263$ -$ -$ 93,900$ -$ -$ 93,900$ 11 2037 100,000$ 100,000$ 1671.12 132,624$ -$ -$ 93,300$ -$ -$ 93,300$ 12 2038 100,000$ 100,000$ 1714.56 136,072$ -$ -$ 92,700$ -$ -$ 92,700$ 13 2039 100,000$ 100,000$ 1759.14 139,610$ -$ -$ 92,100$ -$ -$ 92,100$ 14 2040 18,840,640$ 11,840,640$ 7,000,000$ 1804.88 16,960,521$ -$ 10,026,793$ 10,838,700$ -$ 6,407,700$ 17,246,400$ 15 2041 100,000$ 100,000$ 1851.81 146,964$ -$ -$ 91,000$ -$ -$ 91,000$ 16 2042 100,000$ 100,000$ 1899.96 150,786$ -$ -$ 90,400$ -$ -$ 90,400$ 17 2043 100,000$ 100,000$ 1949.35 154,705$ -$ -$ 89,800$ -$ -$ 89,800$ 18 2044 100,000$ 100,000$ 2000.04 158,728$ -$ -$ 89,300$ -$ -$ 89,300$ 19 2045 100,000$ 100,000$ 2052.04 162,855$ -$ -$ 88,700$ -$ -$ 88,700$ 20 2046 100,000$ 100,000$ 2105.39 167,089$ -$ -$ 88,100$ -$ -$ 88,100$ 21 2047 18,840,640$ 11,840,640$ 7,000,000$ 2160.13 20,298,817$ -$ 12,000,341$ 10,370,000$ -$ 6,130,600$ 16,500,600$ 22 2048 100,000$ 100,000$ 2216.29 175,890$ -$ -$ 87,000$ -$ -$ 87,000$ 23 2049 100,000$ 100,000$ 2273.92 180,464$ -$ -$ 86,500$ -$ -$ 86,500$ 24 2050 100,000$ 100,000$ 2333.04 185,156$ -$ -$ 85,900$ -$ -$ 85,900$ 25 2051 100,000$ 100,000$ 2393.70 189,970$ -$ -$ 85,400$ -$ -$ 85,400$ 26 2052 100,000$ 100,000$ 2455.94 194,910$ -$ -$ 84,900$ -$ -$ 84,900$ 27 2053 100,000$ 100,000$ 2519.79 199,977$ -$ -$ 84,300$ -$ -$ 84,300$ 28 2054 18,840,640$ 11,840,640$ 7,000,000$ 2585.30 24,294,155$ -$ 14,362,322$ 9,921,600$ -$ 5,865,500$ 15,787,100$ 29 2055 100,000$ 100,000$ 2652.52 210,511$ -$ -$ 83,300$ -$ -$ 83,300$ 30 2056 100,000$ 100,000$ 2719.73 215,845$ -$ -$ 82,700$ -$ -$ 82,700$ 31 2057 100,000$ 100,000$ 2788.65 221,314$ -$ -$ 82,100$ -$ -$ 82,100$ 32 2058 100,000$ 100,000$ 2859.31 226,922$ -$ -$ 81,500$ -$ -$ 81,500$ 33 2059 100,000$ 100,000$ 2931.77 232,672$ -$ -$ 81,000$ -$ -$ 81,000$ 34 2060 100,000$ 100,000$ 3006.06 238,568$ -$ -$ 80,400$ -$ -$ 80,400$ 35 2061 18,840,640$ 11,840,640$ 7,000,000$ 3082.23 28,963,793$ -$ 17,122,939$ 9,455,900$ -$ 5,590,200$ 15,046,100$ 36 2062 100,000$ 100,000$ 3160.33 250,812$ -$ -$ 79,300$ -$ -$ 79,300$ 37 2063 100,000$ 100,000$ 3240.41 257,167$ -$ -$ 78,800$ -$ -$ 78,800$ 38 2064 100,000$ 100,000$ 3322.52 263,684$ -$ -$ 78,200$ -$ -$ 78,200$ 39 2065 100,000$ 100,000$ 3406.71 270,365$ -$ -$ 77,700$ -$ -$ 77,700$ 40 2066 100,000$ 100,000$ 3493.03 277,216$ -$ -$ 77,100$ -$ -$ 77,100$ 41 2067 100,000$ 100,000$ 3581.55 284,241$ -$ -$ 76,600$ -$ -$ 76,600$ 42 2068 18,840,640$ 11,840,640$ 7,000,000$ 3672.30 34,508,733$ -$ 20,401,020$ 9,006,300$ -$ 5,324,400$ 14,330,700$ 43 2069 100,000$ 100,000$ 3765.35 298,828$ -$ -$ 75,500$ -$ -$ 75,500$ 44 2070 100,000$ 100,000$ 3860.77 306,400$ -$ -$ 75,000$ -$ -$ 75,000$ 45 2071 100,000$ 100,000$ 3958.60 314,164$ -$ -$ 74,500$ -$ -$ 74,500$ 46 2072 100,000$ 100,000$ 4058.90 322,125$ -$ -$ 74,000$ -$ -$ 74,000$ 47 2073 100,000$ 100,000$ 4161.75 330,287$ -$ -$ 73,500$ -$ -$ 73,500$ 48 2074 100,000$ 100,000$ 4267.21 338,657$ -$ -$ 73,000$ -$ -$ 73,000$ 49 2075 18,840,640$ 11,840,640$ 7,000,000$ 4375.34 41,115,218$ -$ 24,306,670$ 8,578,100$ -$ 5,071,200$ 13,649,300$ 50 2076 100,000$ 100,000$ 4486.21 356,037$ -$ -$ 71,900$ -$ -$ 71,900$ 75,287,200$ 4,562,000$ 41,086,900$ 120,936,100$ 3.25% 3.25% 3.25% 3.25% 50 50 50 50 0.04073 0.04073 0.04073 0.04073 3,066,500$ 185,800$ 1,673,500$ 4,925,800$ Avg Annual Equivalent Cost Year Base Costs Escalated Costs Present Worth Total Present Worth Discount Rate Amortization Period (years) Capital Recovery Factor EVENT COST COST STREAM AAEC Example is for 7-Year periodic renourishment, sand contributions from Dewees Inlet shoal and AICWW (Breach Inlet), and Terminal Groin (Reach 1) Page 44 Cost Summary - Comments ◆ Cost-effectiveness benefits derived from… ▪ Frequent, no cost sand from USACE AICWW Maintenance dredging ▪ Potentially lower cost sand from Dewees Inlet shoal management compared to cost of sand from offshore ▪ Reduced sand loss from terminal groin at southern end of the island Page 45 ◆ Establish/Confirm Beach Management Baseline ◆ Prioritize beach management practices that provide best opportunities to maintain baseline conditions at all times ◆ Prioritize management practices that minimize cost Future Management Page 46 ◆ Establish appropriate beach management baseline ◆ Pursue agreement with Marinex for proposed renourishment pricing ◆ Pursue agreement with USACE to provide beach compatible sand to Reaches 1 and 2 from Breach Inlet AICWW Maintenance Dredging ◆ Investigate in more detail the feasibility, scope and cost of Dewees Inlet Shoal Management (Consider a test project) ◆ Investigate in more detail the feasibility, scope, and cost of a Terminal Groin at the southern end of Reach 1 ◆ Consider last line of defense structural solutions in Reaches 5 and 6 to compliment Dewees Inlet Shoal Management Recommendations for Consideration City of Isle of Palms Beach Preservation Committee Beach Management Alternatives Analysis – Findings Discussion September 2, 2026 1 City of Isle of Palms Request for Proposals (RFP 2026-11) Beach Management Projects Preliminary Engineering and Scoping Requirement. The City of Isle of Palms (“City”) requests proposals from qualified coastal engineering firms to perform preliminary engineering and feasibility assessments for two potential beach management projects: (1) a terminal groin at the southern end of the Isle of Palms near Breach Inlet in Reach 1, and (2) a Dewees Inlet shoal management project serving the northern end of Isle of Palms, principally Reaches 5 and 6. These reach designations are shown in the supplied references. Firms are requested to propose both projects. A proposal addressing only one project will, nevertheless, still be considered. The City may select one firm for both projects, separate firms, or no firm. This solicitation seeks decision-ready, planning-level engineering analyses and cost estimates. This engagement excludes final design, submission of permit applications, and construction, including construction of a test project. A selected firm may be considered for later work under a separate authorization or procurement, at the City’s discretion. No later phase is guaranteed. BACKGROUND Foth | Olsen presented its Beach Management Alternatives Analysis to City Council on September 22, 2026. Its recommendations include further investigation of the feasibility, scope, and cost of a terminal groin at the southern end of Reach 1 and of a shoal management project at the Dewees Inlet shoal, potentially including a test project. The presentation’s structure dimensions, sand volumes, performance estimates, intervals, and cost assumptions are conceptual. Proposers should evaluate them, not treat them as approved designs or guaranteed outcomes. The Foth | Olsen presentation is a reference document for this RFP. Additionally, the City intends to include Foth’s final written report and the most recent beach monitoring report when available [currently stated to be ready on 9 OCT]; the final reference list is to be confirmed. Proposers shall identify additional data they need and avoid duplicating reliable existing work. SCOPE OF WORK AND SERVICES - OVERVIEW For each project awarded, the selected firm shall prepare a preliminary engineering assessment and project implementation plan sufficient for the City to understand feasibility, major risks, likely approvals, planning-level costs, schedule, and the next major decision point(s). In the proposal, identify the field investigations, analyses, environmental studies, public engagement, and regulatory coordination proposed for this engagement, and the resulting data and findings the City will receive. Distinguish this work from studies and services recommended for later phases. The selected firm shall perform the work agreed in the contract and deliver the resulting data and findings. Explain which work is essential now, which can be deferred, and what would cause the City to stop or change course. The firm shall propose a regular cadence of staff coordination and progress reporting, including at least monthly In Progress Reviews (IPRs) with City staff. The end state is a separate preliminary engineering report and executive briefing for each project, presenting the planning-level analyses and cost estimates the City needs to decide whether to proceed to design and permitting, obtain specified additional information, or modify or discontinue the project. Each report shall present the recommended concept and design considerations, potential impacts, risks, unresolved questions, and cost ranges with their assumptions. Its implementation plan shall identify the studies, approvals, design work, schedule, and City decisions needed before construction bidding. Address regulatory feasibility and property and access constraints, including potential barriers, 2 required permissions, and information needed to resolve them. Support each recommendation with engineering findings; identify the information needed to resolve any uncertainty that prevents a decision. Deliver a draft report and implementation plan for City review, then final versions addressing City comments. Provide reports and plans in PDF and editable formats, supporting data and analysis files in their native or commonly usable formats, and briefing slides in PDF and editable formats. Include one executive presentation per project to City Council or its designated committee, with staff coordination through the IPRs. Final design, permit applications, test-project construction, and construction bid packages are outside this initial engagement. PROJECT 1 TERMINAL GROIN AT SOUTHERN END OF REACH 1 Evaluate whether a terminal groin or similar structure can reduce sand loss and support the City’s beach management goals at the southern end of Isle of Palms. Examine existing beach and inlet conditions; plausible structure locations, configurations, and materials; interaction with nourishment; construction access; expected performance; maintenance; and effects under a no-action comparison. Assess potential changes to erosion, accretion, sediment transport, inlet morphology, navigation, and habitat on Isle of Palms, within Breach Inlet, and at Sullivan’s Island and other potentially affected areas. Explain uncertainties, methods, and the additional work needed to establish and address impacts. For Project 1, submit completed Grid A (A1–A9) in Appendix 1, Pricing. Use the grid to summarize fees, future cost estimates, and their basis. Explain the technical approach in the proposal narrative and cross-reference it by element identifier; do not repeat the narrative in the grid. The pricing instructions below apply to both grids. Work element Proposed fee for current work Later cost estimate Cost basis and exclusions A1. Preliminary engineering and feasibility Fee estimate Future work range, if any Data, concept refinement, surveys, modeling, and deliverables A2. Downdrift and adjacent-area impacts Fee estimate Follow-on study range IOP, Breach Inlet, Sullivan’s Island, waterways, habitat A3. Design costs and factors Scoping fee, if any Preliminary and final design range Structure options, dimensions, geotechnical needs, nourishment A4. Permitting and environmental review Scoping fee, if any Studies and permit-phase range Likely approvals, sequence, agency consultation, uncertainty A5. Construction administration and inspection Scoping fee, if any Future services range Duration, field staffing, observation, testing, reporting A6. Construction and initial nourishment Estimating fee, if any Capital range Quantities, unit rates, access, mobilization, contingency A7. Monitoring, maintenance, and adaptive action Scoping fee, if any Annual and event range Surveys, performance measures, repair, sand bypass needs A8. Other critical factors Fee estimate Future cost range Identify risks, dependencies, exclusions, and allowances A9. Total current engagement cost Base fee + estimated reimbursables = total N/A Itemize reimbursables; optional tasks excluded 3 PROJECT 2 DEWEES INLET SHOAL MANAGEMENT FOR REACHES 5 AND 6 Evaluate the feasibility of intercepting suitable sand within the shoal system adjacent to Dewees Inlet and placing it along the north end of Isle of Palms, principally Reaches 5 and 6. Assess potential borrow areas, sediment compatibility and availability, shoal movement and inlet dynamics, dredge access and methods, placement locations, project volume and frequency, potential test project, and integration with other beach work. Examine potential effects on Isle of Palms, Dewees Island, the inlet and adjacent waterways and land masses, navigation, habitat, and neighboring shorelines. Assess possible borrow and placement configurations against existing conditions and identify the information needed to define an initial project. For Project 2, submit completed Grid B (B1–B10) in Appendix 1, Pricing, using the same instructions as Grid A. Address B3 as a separate test-project scenario: propose the preliminary work needed to assess and scope a test, estimate its possible later implementation costs, or explain why a test is not recommended. B4–B8 shall describe the larger shoal management project. Explain whether the test would be additional to, substitute for, or contribute to that project; identify shared costs and do not add overlapping test and larger-project estimates together. Work element Proposed fee for current work Later cost estimate Cost basis and exclusions B1. Preliminary engineering and feasibility Fee estimate Future work range, if any Shoal mapping, sediment, dredge access, placement options B2. Downdrift and adjacent-area impacts Fee estimate Follow-on study range IOP, Dewees Island, inlet, waterways, habitat B3. Test project Scoping fee, if any Design, permits, build, and monitoring ranges Candidate scale, objectives, decision criteria; or rationale against test B4. Design costs and factors Scoping fee, if any Preliminary and final design range Borrow limits, fill template, volumes, equipment, sequencing B5. Permitting and environmental review Scoping fee, if any Studies and permit-phase range Likely approvals, agency consultation, constraints B6. Construction administration and inspection Scoping fee, if any Future services range Dredging and placement oversight, surveys, reporting B7. Construction and sand placement Estimating fee, if any Capital range per event Mob/demob, cubic-yard pricing, contingency, frequency B8. Monitoring, maintenance, and adaptive action Scoping fee, if any Annual and event range Shoal/shoreline response, sediment budget, triggers B9. Other critical factors Fee estimate Future cost range Identify risks, dependencies, exclusions, and allowances B10. Total current engagement cost Base fee + estimated reimbursables = total N/A Itemize reimbursables; optional tasks excluded Pricing instructions. “Proposed fee for current work” is the estimated fee for this preliminary engineering engagement; state whether pricing is fixed or time and materials. “Later cost estimate” is a planning- level estimate for a future phase or construction. Base proposal-stage estimates on available information and stated assumptions. No new field work, modeling, or studies are required to prepare a proposal. If a future cost cannot yet be estimated reliably, explain what information is needed. The selected firm shall refine these estimates during the assessment. For future costs, provide low, most-likely, and high ranges where practicable, with the price year, available quantities or unit rates, contingency, escalation assumptions, and cost drivers. Identify shared 4 tasks, services by others, and combined-project savings. Price each current task once; cross-reference any fee included in another element. A9 and B10 shall show the base professional fee, estimated reimbursables, and total estimated current-engagement cost. Include required subconsultant and other current costs in that total and identify their basis. Show optional tasks separately, excluded from the base total. No City-imposed not-to-exceed budget is specified. PROPOSAL CONTENTS AND SUBMITTAL INSTRUCTIONS Consistent with the City’s procurement procedures, the City seeks evidence of professional and technical qualifications, demonstrated competence, and a practical approach to the work. Issue date: to be confirmed. Proposal submission deadline: to be confirmed. Submit one hard copy in a sealed envelope marked “RFP 2026-11 - Beach Management Projects Preliminary Engineering and Scoping.” Physical Address Instructions (Delivery by Courier or Mail Service such as FEDEX): C/o Douglas Kerr City Administrator City of Isle of Palms 1207 Palm Boulevard Isle of Palms, South Carolina 29451 Mailing Instructions (US Mail): C/o Douglas Kerr City Administrator City of Isle of Palms Post Office Box 508 Isle of Palms, South Carolina 29451 Questions shall be submitted by email to Deputy City Administrator Sean Kuester at skuester@isleofpalms.gov. Question deadline: to be confirmed. Answers will be issued by addendum on the City’s Requests for Bids and Proposals webpage. Questions sent after the deadline will not be answered. Proposers are responsible for reviewing all addenda and shall acknowledge each addendum in their proposal. PROPOSAL REQUIREMENTS The narrative portion should not exceed twenty pages (approximately ten pages per project). The cost grids, pricing information, resumes, relevant project examples, and references may be appended and will not count against the twenty-page limit. A proposal for one project shall clearly identify that project. At a minimum, include: 1. Cover Letter. Authorized representative(s); identify the project or projects proposed; Executive Summary at discretion. 2. Qualifications. Describe the firm’s qualifications and proposed team, highlighting experience in coastal engineering, inlet and sediment analysis, modeling, environmental review, permitting, and similar projects in South Carolina. 3. Project Approach. Describe the overall approach, then explain how each applicable scope requirement will be addressed. Use A/B identifiers to connect the narrative to the grids; cross- references may replace repeated content. Address technical methods, existing information, field investigations and modeling, impacts, project concept and design considerations, public engagement, regulatory coordination, and City decision points. Distinguish current work from later phases. Describe the preliminary engineering report, implementation plan, executive briefing, and supporting data and files the City will receive. Explain how the findings will support a decision to 5 proceed, obtain additional information, or modify or discontinue the project. Explain the basis for any recommended change to the project concept. 4. Timeline and Coordination. Provide a schedule for each project, critical dependencies, agency coordination, anticipated City decisions or data needs, staff meeting cadence, and progress reporting. Include milestones for draft delivery, City review, final delivery, and the executive presentation. Proposers should anticipate at least monthly In Progress Reviews (IPRs) with City staff to keep staff abreast of the project’s progress. 5. Disclosures. Disclosure of current or recent roles on the City’s beach program or with other potentially affected interests, with an approach to maintaining independent analysis. A. Appendix 1. Pricing. Submit completed Grid A and/or Grid B with a supporting pricing narrative organized by the same element identifiers. Follow the pricing instructions under Scope of Work and Services. Provide hourly rates, reimbursables, subconsultant costs, exclusions, optional tasks, and combined-project savings. Explain whether taxes, travel, field work, laboratory services, and agency fees are included in the base fee or estimated reimbursables; include all required current costs in the total. Identify the supporting data and files included in the proposed fee. Cross-reference technical methods and schedules in the proposal narrative instead of restating them here. B. Appendix 2. Resumes. These are in addition to the more broad “qualifications” section. At proposer discretion, list individual resumes. C. Appendix 3. Relevant Work and References. At least three comparable projects with client contacts. EVALUATION PROCESS AND CRITERIA The City may evaluate the projects separately and may interview firms, request clarification, negotiate scope and price, or decline to award. Evaluation will consider at least: understanding of the particular shoreline and inlet systems; quality and independence of the proposed investigation and impact methods; relevant project and permitting experience; qualifications and availability of the named team; clarity of deliverables and schedule; and value and transparency of the proposed fees and planning- level cost estimates. The City reserves the right to reject any or all proposals, waive minor irregularities, and cancel the solicitation if in its best interest. Additional evaluation criteria may be applied at the City’s discretion. GENERAL SUBMISSION TERMS Deadline for Submissions: to be confirmed. Proposals will be received by mail or courier in a sealed envelope clearly marked with the RFP number and title and containing one hard copy. It is the responsibility of proposers to verify receipt by the City. No proposal will be considered unless actually received by the City at the stated place, date, and time. The City is not responsible for any failure, misdirection, delay, or error resulting from the proposer’s selected delivery method. All proposals shall include a current email address. Proprietary and/or Confidential Information: Proposals are public documents under the South Carolina Freedom of Information Act, except for information determined by the City to qualify for an exception to disclosure. All information claimed to be confidential or proprietary must be clearly identified. Each page containing such information, in whole or in part, must be marked CONFIDENTIAL in bold type of at least 12 points in the upper-right corner. All information not so identified will be subject to disclosure by the City. 6 Proposers acknowledge that the City will not be liable for costs, expenses, losses, damages, or liabilities incurred in preparing or submitting a proposal, negotiating changes, or as a result of acceptance, nonacceptance, or rejection of proposals. Proposers are responsible for accurate, adequate, and clear responses. Neither issuance of this RFP nor receipt and evaluation of a response commits the City to award a contract. Proposers must have or be able to obtain an Isle of Palms business license. REFERENCE DOCUMENTS • Reference 1. Foth | Olsen, Beach Management Alternatives Analysis, presentation to City Council, September 22, 2026, including the project concepts and recommendations on slide 40. To be supplied with this RFP. • Reference 2. Foth | Olsen final written report. Title, date, and availability: to be confirmed. • Reference 3. Most recent City beach monitoring report. Title, date, and availability: to be confirmed. 1 Douglas Kerr From: Scott Finnis <sfinnis@coastalscience.com> Sent: Tuesday, September 29, 2026 11:37 AM To: Douglas Kerr; Sean Kuester; Andrew P. Schumacher Cc: Steven Traynum Subject: IOP Sand Fencing Plan Draft Attachments: 2623-IOP Sand Fencing Plan_compressed.pdf All, Attached is the sand fencing and vegetation plan draft given the updated budget. Let me know if you want to discuss these plans further, possibly after our weekly meeting on Thursday. Below is a recap of what is suggested and why each reach: Reaches 1 and 2: Given the full budget for Reaches 1 and 2 the design doesn't change all that much. Vegetation is still the same spacing at 18" on center between each plant and has the same plant variation that was specified in the bid. This covers the same 40 feet of dune that was suggested in previous iterations. For fencing in Reach 1 it extends the whole dune, with the exception of some sections removed from where prominent walkways are. This fencing has been moved to cover the area where the dune wasn't built further east. For fencing in Reach 2 it extends the whole with sections removed at walkovers. These sections have been moved in front of Grand Pavilion where a dune exists but can benefit from fencing. Reach 3: Due to the decreased budget, the spacing between vegetation has been adjusted to 24" on center while still covering the 40 feet of dune width. For fencing we concentrated on fencing further north of the fill where the dune was not built, as we felt these areas would best benefit from fencing. The fencing has been spaced so that there is plenty of access with homes and public walkways. There is some variation for Reach 3 on if fencing is removed from certain areas it may free up more money to add more vegetation. This rewuires input from the City on what they want to do with fencing here. Let me know if you guys want to go over this Thursday or on a different meeting. Thanks, Scott Finnis Coastal Engineer at Coastal Science & Engineering, Inc. Phone 973-713-2917 Web www.coastalscience.com Email sfinnis@coastalscience.com PO 8056, Columbia, SC 29202 300+00 310+00 320+00330+00328+00 SeascapeOcean ClubSeascapeOcean ClubPort O CallSeascapeOcean Club Sand Fencing PlanSBTSF28 Sept 2026PROJECT #:APPROVED BY:DRAWN BY:DATE:SHEET NO:SCALE:AS SHOWNSF1PROJECT:DRAWING TITLE:CLIENT:CITY OF ISLE OF PALMS1207 PALM BLVD.ISLE OF PALMS SC 29451FSNACERTIETACIOUTHCAROLIOFCOASTALSCIENCE& ENGINEERINGNo. C01950RAUTHOITAZION Survey Datum:Horizontal: NAD83 South Carolina State Planes, International FootVertical: NAVD '88 (Feet)Photo: 5 February 2026 by Coastal Science & EngineeringData Collected: June 2026KEYNOTEConstruction AccessStaging AreaDaily ParkingWalkoverASP 2623Beach Nourishment Project 0100Scale (Feet) Vegetated Dune CrestVegetated Dune SlopeSand Fence 15' Dune Crest(Typical)Dune Plan View(Typical Newly Constructed Dune @ +13 ft NAVD) Slope Dune Crest (Shaded Area)Seaward Dune Crest LimitDune Slope (1 on 4) Dune Section View(Typical Newly Constructed Dune @ +13 ft NAVD) Slope Landward Dune Crest Limit60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 18" O.C. (Typical) W Slope Slope Fence Post (3" Typical)"V" Sand Fence (Typical)6' - 0" Apart10' "V" Fence SectionWith Interior Angleof 120° 25'15' Dune Crest@ +13 ft NAVDSeaward Dune Crest Limit60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 18" O.C. (Typical)Newly Constructed DuneLandward /Backshore Vegetated Dune CrestVegetated Dune SlopeSand FenceVegetated Dune CrestVegetated Dune SlopeSand FenceVegetated Dune CrestVegetated Dune SlopeSand Fence Reach 1Linear Footage of Dune: ~2,750 lfS S WW WW W Dune CrestDune Slope Interior Angle of 120° 10'Seaward Toe of Dune 240+00 250+00 260+0057th Ave 57th Ave57th Ave Grand Pavilion Beachwood East Beachwood EastDunecrest Ln Sand Fencing PlanSBTSF28 Sept 2026PROJECT #:APPROVED BY:DRAWN BY:DATE:SHEET NO:SCALE:AS SHOWNSF2PROJECT:DRAWING TITLE:CLIENT:CITY OF ISLE OF PALMS1207 PALM BLVD.ISLE OF PALMS SC 29451FSNACERTIETACIOUTHCAROLIOFCOASTALSCIENCE& ENGINEERINGNo. C01950RAUTHOITAZION Survey Datum:Horizontal: NAD83 South Carolina State Planes, International FootVertical: NAVD '88 (Feet)Photo: 5 February 2026 by Coastal Science & EngineeringData Collected: June 2026KEYNOTEConstruction AccessStaging AreaDaily ParkingWalkoverASP 2623Beach Nourishment Project 0100Scale (Feet) SA Vegetated Dune CrestVegetated Dune SlopeSand Fence 15' Dune Crest(Typical)Dune Plan View(Typical Newly Constructed Dune @ +13 ft NAVD) SlopeSeaward Dune Crest Limit Slope Landward Dune Crest Limit W Slope Slope WWWWWW Vegetated Dune CrestVegetated Dune SlopeSand Fence Vegetated Dune CrestVegetated Dune SlopeSand Fence Vegetated Dune CrestVegetated Dune SlopeSand Fence W WWWWW W W Reach 2Linear Footage of Dune: ~3,625 lf Dune CrestDune Slope Dune Crest (Shaded Area) Dune Slope (1 on 4) 60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 18" O.C. (Typical) Dune Section View(Typical Newly Constructed Dune @ +13 ft NAVD) "V" Fence SectionWith Interior Angleof 120° 25'15' Dune Crest@ +13 ft NAVDSeaward Dune Crest Limit60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 18" O.C. (Typical)Newly Constructed DuneLandward /Backshore Fence Post (3" Typical)"V" Sand Fence (Typical)6' - 0" Apart10' Interior Angle of 120° 10'Seaward Toe of Dune 0+00 10+00 20+00 30+0040+00 50+00 60+00 70+00 80+00 90+00 Sand Fencing PlanSBTSF28 Sept 2026PROJECT #:APPROVED BY:DRAWN BY:DATE:SHEET NO:SCALE:AS SHOWNSF3PROJECT:DRAWING TITLE:CLIENT:CITY OF ISLE OF PALMS1207 PALM BLVD.ISLE OF PALMS SC 29451FSNACERTIETACIOUTHCAROLIOFCOASTALSCIENCE& ENGINEERINGNo. C01950RAUTHOITAZION Survey Datum:Horizontal: NAD83 South Carolina State Planes, International FootVertical: NAVD '88 (Feet)Photo: 5 February 2026 by Coastal Science & EngineeringData Collected: June 2026KEYNOTEConstruction AccessStaging AreaDaily ParkingWalkoverASP 2623Beach Nourishment Project 0300Scale (Feet) Vegetated Dune CrestVegetated Dune SlopeSand Fence Dune Plan View(Typical Newly Constructed Dune @ +13 ft NAVD) W WWW W A A SP P P Vegetated Dune CrestVegetated Dune SlopeSand Fence Vegetated Dune CrestVegetated Dune Slope Sand Fence Dune CrestDune Slope Reach 3Linear Footage of Dune: ~6,300 lfDune Section View(Typical Newly Constructed Dune @ +13 ft NAVD)25'15' Dune Crest@ +13 ft NAVDSeaward Dune Crest Limit60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 24" O.C. (Typical)Newly Constructed DuneLandward /Backshore 60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 24" O.C. (Typical) No Dune 15' Dune Crest(Typical) SlopeSeaward Dune Crest Limit Slope Landward Dune Crest Limit Slope Slope Dune Crest (Shaded Area) Dune Slope (1 on 4)Fence Post (3" Typical)"V" Sand Fence (Typical)6' - 0" Apart10' Interior Angle of 120°10'Seaward Toe of Dune WW WW WAP PA SS "V" Fence SectionWith Interior Angleof 120°

Source: City of Isle of Palms website. First collected Oct 13, 2026.