Beach Preservation Committee
9:00 a.m., Thursday, October 1, 2026
1207 Palm Boulevard
City Hall Council Chambers
Public Comment:
All citizens who wish to speak during the meeting must email their first and last name, address
and topic to Nicole DeNeane, City Clerk, at nicoled@isleofpalms.gov no later than 3:00 p.m.
the day before the meeting. Citizens may also provide written public comment here:
https://www.isleofpalms.gov/public-comment-form
A
genda
1. Call to order and acknowledgment that the press and the public have been duly
notified of the meeting in accordance with the Freedom of Information Act.
2. Citizens’ comments- All comments have a time limit of three (3) minutes.
3. Approval of Minutes- September 2, 2026
4. New Business-
a. Discussion of alternatives analysis presentation (9:00am)
b. Discussion and recommendation of future RFP for terminal groin and
shoal management feasibility, design, permitting, and construction
administration (9:15am)
c. Discussion and recommendation on future dune vegetation and fencing
(9:30am)
d. Discussion of information to be included in future beach monitoring
reports (9:45am)
5. Old Business- Update on beach renourishment project (10:00am)
6. Miscellaneous Business- Next meeting: Thursday, November 5, 2026 at 9am
7. Adjournment
City of Isle of Palms
Beach Preservation Committee
Beach Management
Alternatives Analysis – Findings Discussion
September 2, 2026
Page 2
◆ Recap of Study Baseline Definition
◆ Summary of Assumed Initial Conditions
▪ Volume Change Rates
▪ 2026 Project
◆ Alternatives
◆ Cost Analysis - Assumptions and Results
◆ Future Management
Outline
Page 3
◆ Baseline Development:
▪ Assumed to represent the primary dune crest of
minimum beach position
▪ Identified as the seaward-most occurrence of:
• 50-ft offset from seaward edge of development,
• 2017 SCDES Baseline, or
• Seaward edge of 2026 dune, where constructed.
Alternatives Study Baseline Definition
Page 4
Alternatives Study Baseline Definition
Development Line
(estimated)
2017 SCDES
2026 Dune
50-ft
(min.)
~175 to 200-ft
The “baseline” is assumed to be the primary
dune crest that is identified by the seaward
most occurrence of;
(1) 50-ft seaward of development line,
(2) the 2017 SCDES line, or
(3) the seaward edge of the 2026
constructed dune.
MHHW
Page 5
Alternatives Study Baseline Definition
Study Baseline
Seaward Edge of Infrastructure (typ.)
50-ft Seaward of Seaward Edge of Infrastructure (typ.)
2017 SCDES Baseline
2026 Dune
Beach Monitoring
Stations
Atlantic Ocean
Breach
Inlet
Page 6
Alternatives Study Baseline Definition
Seaward Edge of Infrastructure (typ.)
Study Baseline
50-ft Seaward of Seaward Edge of Infrastructure (typ.)
2017 SCDES
Baseline
2026 Dune
Beach Monitoring
Stations
Page 7
Page 7
Initial Conditions
Page 8
Volume Change Rates
“Low Rate”
Survey Period: April 2018 – September 2024
“High Rate”
Survey Period: July 2021 – September 2024
Note: Volume change rates were derived from volume data reported by CSE.
Page 9
Volume Change Rates (Reach 1)
Note: Volume change rates were derived from volume data reported by CSE.
Volume change data used
for Alternatives Analysis
Page 10
Volume Change Rates (Reach 5)
Note: Volume change rates were derived from volume data reported by CSE.
Volume change data used
for Alternatives Analysis
Page 11
NET Volume Change Rates (Reaches 1-6)
Note: Volume change rates were derived from volume data reported by CSE.
April 2018 -
September 2024
("low")
July 2021 -
September 2024
("high")
Reach 1 4,000 -36,800 -96,200
Reach 2 5,000 -22,300 -32,900
Reach 3 5,000 20,500 25,600
Reach 4 8,200 82,000 53,200
Reach 5 5,800 -141,900 -108,400
Reach 6 4,800 -102,200 -95,700
Total All Reaches 32,800 -200,700 -254,400
Total Reaches 1, 2, 5, & 6 19,600 -303,200 -333,200
Reach Length (ft)
Annualized Volume Change Rate
(cy/yr)
Reach
Page 12
2026 Project Volumes
Based on June. 2026 Survey
800,700 cy
799,100 cy 880,100 cy
Page 13
Post-2026 Beach Conditions (Projected)
This is the starting condition for
the alternatives analysis
Based on June. 2026 Survey
Page 14
Page 14
Alternatives
Page 15
Alternatives
◆ No-Action (“Do Nothing”)
◆ Beach Renourishment Only (Low and High Sand Loss Rates)
▪ Scheduled (5-yr, 7-yr, and 10-yr intervals)
▪ Triggered (Interval Required to Protect Baseline Condition)
◆ USACE Breach Inlet ICWW Maintenance – Reach 1 (150,000 cy every 3 yrs)
◆ Dewees Inlet Shoal Management – Reaches 5 and 6 (700,000 cy every 7 yrs)
◆ Terminal Groin (R1)
◆ T-Groins/Breakwaters and/or Geotubes (R5/R6) – Reaches 5 and 6 (last line of defense)
Page 16
No Action (Low Sand Loss Rate)
Note: Does not
consider
possible future
AICWW beach
disposal.
Page 17
No Action (High Sand Loss Rate)
Note: Does not
consider
possible future
AICWW beach
disposal.
Page 18
2026 Project Performance
Assuming recent beach change conditions continue,
the 2026 Project is expected to maintain beach
conditions seaward of the entire assumed beach
management Baseline for no more than about 3 years.
Page 19
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
Volume
Lost
Seaward of
Baseline
(cy)
Volume
Lost
Landward of
Baseline
(cy)
Total
Volume
Lost
(cy)
1 122,300 61,500 183,800 245,300 158,300 322,800 481,100 803,900
2 111,400 0 111,400 111,400 164,300 0 164,300 164,300
3 0 0 0 0 0 0 0 0
4 0 0 0 0 43,400 0 43,400 43,400
5 664,200 45,000 709,200 754,200 564,800 28,500 593,300 621,800
6 503,700 7,500 511,200 518,700 591,100 126,500 717,600 844,100
Total 1,401,600 114,000 1,515,600 1,629,600 1,521,900 477,800 1,999,700 2,477,500
Predicted Preformance of 2026 Project after 5 Years [D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Predicted Preformance of 2026 Project after 5 Years
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
5-Year Project Interval after Completion of 2026 Project
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Renourishment - Scheduled
◆ Required Future Volume Following Completion of 2026 Project
▪ Restore Minimum AND Maintain Baseline Beach Condition
▪ Future Advance Fill required for 5-, 7-, and 10-year renourishment intervals
Page 20
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
1 158,300 209,200 367,500 576,700 158,300 804,000 962,300 1,766,300
2 222,800 0 222,800 222,800 262,600 66,000 328,600 394,600
3 0 0 0 0 0 0 0 0
4 0 0 0 0 86,800 0 86,800 86,800
5 885,300 533,300 1,418,600 1,951,900 741,500 445,000 1,186,500 1,631,500
6 865,800 156,600 1,022,400 1,179,000 761,700 673,600 1,435,300 2,108,900
Total 2,132,200 899,100 3,031,300 3,930,400 2,010,900 1,988,600 3,999,500 5,988,100
Predicted Preformance of 2026 Project after 10 Years [D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Predicted Preformance of 2026 Project after 10 Years
10-Year Project Interval after Completion of 2026 Project
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
Reach
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
1 146,300 110,900 257,200 368,100 158,300 515,300 673,600 1,188,900
2 155,900 0 155,900 155,900 218,900 11,000 229,900 240,900
3 0 0 0 0 0 0 0 0
4 0 0 0 0 60,800 0 60,800 60,800
5 816,100 176,900 993,000 1,169,900 675,900 154,700 830,600 985,300
6 674,300 41,400 715,700 757,100 715,100 289,600 1,004,700 1,294,300
Total 1,792,600 329,200 2,121,800 2,451,000 1,829,000 970,600 2,799,600 3,770,200
Predicted Preformance of 2026 Project after 7 Years [D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
April 2018 - September 2024
("Low" Erosion Rate)
7-Year Project Interval after Completion of 2026 Project
July 2021 - September 2024
("High" Erosion Rate)
Reach
Predicted Preformance of 2026 Project after 7 Years
Renourishment - Scheduled
Page 21
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
1 97,300 13,000 110,300 123,300 88,100 8,100 96,200 104,300
2 66,800 0 66,800 66,800 32,900 0 32,900 32,900
3 0 0 0 0 0 0 0 0
4 0 0 0 0 8,700 0 8,700 8,700
5 418,500 7,100 425,600 432,700 118,700 0 118,700 118,700
6 306,700 0 306,700 306,700 141,700 1,900 143,600 145,500
Total 889,300 20,100 909,400 929,500 390,100 10,000 400,100 410,100
Predicted Preformance of 2026 Project after 3 Years Predicted Preformance of 2026 Project after 1 Year[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Trigger - 3 Years Until Erosion into Baseline
[Between Stations 12+00 and 30+00]
Trigger - 1 Year Until Erosion into Baseline
[Between Stations 12+00 and 30+00]
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
Renourishment - Triggered
◆ Implement renourishment on scheduled intervals regardless of beach
condition between intervals
Page 22
Breach Inlet AICWW Beach Disposal
Note: Concept only.
Goals:
• Beneficial use of available dredge material
• Supplemental sand source for Reaches 1 and 2
• Extend time between required renourishments
• Reduce sand need from offshore borrow areas
Assumptions:
• 3 yr interval (more or less)
• ~150,000 cy/event (equivalent to ~50,000 cy/yr)
• All material placed in Reaches 1 and 2
• Available material is suitable for beach placement
• Material provided at no cost to the City
Reach 2Reach 1
Atlantic Intracoastal Waterway (AICWW)
Page 23
Dewees Inlet Shoal Management
Note: Concept only.
Goals:
• Collect ebb shoal sand before migrating shoals
approach IOP shoreline
• Place sand along Reaches 5 and 6
• Reduce impacts of future shoal attachments
• Extend time between required renourishments
• Reduce sand need from offshore borrow areas
Assumptions:
• 7 yr interval
• 700,000 cy/event (equivalent to 100,000 cy/yr)
• All material placed in Reaches 5 and 6
Page 24
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
1 122,300 61,500 183,800 245,300 106,700 158,300 322,800 481,100 803,900 718,200
2 111,400 0 111,400 111,400 0 164,300 0 164,300 164,300 0
3 0 0 0 0 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 43,400 0 43,400 43,400 0 43,400
5 664,200 45,000 709,200 754,200 504,200 564,800 28,500 593,300 621,800 371,800
6 503,700 7,500 511,200 518,700 268,700 591,100 126,500 717,600 844,100 594,100
Total 1,401,600 114,000 1,515,600 1,629,600 750,000 879,600 1,521,900 477,800 1,999,700 2,477,500 750,000 1,727,500
5-Year Project Interval after Completion of 2026 Project
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
250,000
500,000
250,000
500,000
Renourishment – with AICWW and Shoal Mgt Sand
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
1 146,300 110,900 257,200 368,100 174,000 158,300 515,300 673,600 1,188,900 1,079,800
2 155,900 0 155,900 155,900 0 218,900 11,000 229,900 240,900 0
3 0 0 0 0 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 60,800 0 60,800 60,800 0 60,800
5 816,100 176,900 993,000 1,169,900 819,900 675,900 154,700 830,600 985,300 635,300
6 674,300 41,400 715,700 757,100 407,100 715,100 289,600 1,004,700 1,294,300 944,300
Total 1,792,600 329,200 2,121,800 2,451,000 1,050,000 1,401,000 1,829,000 970,600 2,799,600 3,770,200 1,050,000 2,720,200
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
700,000
350,000
700,000
350,000
7-Year Project Interval after Completion of 2026 Project
Page 25
Renourishment – with AICWW and Shoal Mgt Sand
◆ Demand on offshore sand can be reduced with use of beach compatible sand
from AICWW and Dewees Inlet Shoal Management.
◆ Proposed sand volume from AICWW beach disposal MAY NOT be sufficient to
maintain Baseline conditions along Reach 1 without sand from offshore.
◆ Available volumes and schedule will need to be confirmed.
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
1 158,300 209,200 367,500 576,700 299,500 158,300 804,000 962,300 1,766,300 1,660,900
2 222,800 0 222,800 222,800 0 262,600 66,000 328,600 394,600 0
3 0 0 0 0 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 86,800 0 86,800 86,800 0 86,800
5 885,300 533,300 1,418,600 1,951,900 1,451,900 741,500 445,000 1,186,500 1,631,500 1,131,500
6 865,800 156,600 1,022,400 1,179,000 679,000 761,700 673,600 1,435,300 2,108,900 1,608,900
Total 2,132,200 899,100 3,031,300 3,930,400 1,500,000 2,430,400 2,010,900 1,988,600 3,999,500 5,988,100 1,500,000 4,488,100
10-Year Project Interval after Completion of 2026 Project
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
500,000
1,000,000
500,000
1,000,000
Page 26
Renourishment with Structures
◆ Terminal Groin (Reach 1)
Page 27
7-Year Condition
Volume
Loss
Beyond
Baseline
(typ.)
Post-Project Beach
Volume Performance
Relative to Baseline
“Low” rate (2018-2024)
“High” rate (2021-2024)
Anticipated Sand Loss Landward of Baseline (Reach 1)
Page 28
Reach 1 Reach 2
6th Avenue
Area of Highest Erosion
and Volume Loss (typ.)
Beach Monitoring
Stations
Pier
14th Avenue
Anticipated Sand Loss Landward of Baseline (Reach 1)
Page 29
Reach 1 Reach 2
6th Avenue
Terminal Groin
(~1,200 ft)
Concept shoreline
response
14th Avenue
Pier
Goals:
• Reduce sand loss from the southern end
of the island
• Anchor shoreline position away from
Baseline
• Extend time between required
renourishment events
• Reduce demand on sand from offshore
borrow areas
Assumptions:
• ~1,200 feet long
(most of structure to be buried)
• ~15,000 tons of rock
(with stone-filled mattress foundation)
• Reduces sand loss:
• Reach 1 by 50%
• Reach 2 by 25%
Terminal Groin (Reach 1)
Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed.
Page 30
Renourishment with Structures
◆ Terminal Groin (Reach 1)
◆ T-Groins/Breakwaters (Reaches 5 and 6)
Page 31
7-Year Condition
Volume
Loss
Beyond
Baseline
(typ.)
Post-Project Beach
Volume Performance
Relative to Baseline
“Low” rate (2018-2024)
“High” rate (2021-2024)
Anticipated Sand Loss Landward of Baseline (Reaches 5 &6)
Page 32
Area of
Highest
Erosion
(typ.)
Wild Dunes Resort
Anticipated Sand Loss Landward of Baseline (Reaches 5 &6)
Page 33
T-Groins and Breakwaters (Reaches 5 and 6)
Breakwater
(typ.)
T-groin
(typ.)
Wild Dunes Resort
Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed.
Goals:
• Provide last line of defense to
upland
• Anchor shoreline position at
Baseline under most eroded
conditions
• Maintain recreational beach
seaward of Baseline
Note: Not intended to reduce sand loss rate
from renourishment but may allow for
smaller fill volumes and longer periods
between renourishments
Assumptions:
• Reach 5 (5, T-groins and 2, breakwaters)
• Reach 6 (2, T-groins and 2, breakwaters)
• T-Groin = 2,800 tons with foundation
• Breakwater = 1,600 tons with foundation
Page 34
Renourishment with Structures
◆ Terminal Groin (Reach 1)
◆ T-Groins/Breakwaters (Reaches 5 and 6)
◆ Sand filled Geotubes (Reaches 5 and 6)
Page 35
Geotubes (Reaches 5 and 6)
Geotubes
(typ.)
Wild Dunes Resort
Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed.
Goals:
• Provide last line of defense to
upland
• Anchor shoreline position at
Baseline under most eroded
conditions
Note: Not intended to maintain recreational
beach seaward of Baseline
Assumptions:
• Reach 5 = 3,300 feet
• Reach 6 = 1,700 feet
Page 36
Beach Management Elements Summary
Note: Concept. Does not represent a final design.
Renourishment
Renourishment
AICWW Beach Disposal
Dewees Inlet Shoal Mgt
T-Groins/
Breakwaters
or Geotubes
Offshore Borrow Areas
Reach 2Reach 1
Reach 5
Reach 6
Terminal Groin
Page 37
Known Offshore Sand Sources
Sand Availability: no more than
~25 Mcy (pre-2026) (ref: CSE)
◆ Depleted: A, B, C, F
◆ Partially Depleted: E
◆ Available: D, G
◆ 2026 Project: Area 1
◆ Future: Area 2-5
Sand Demand:
Planning
Period
(yrs)
Total
Sand
Demand
(cy)
Total Sand
Demand with
20%
Contingency
(cy)
Low 303,000 50 15,150,000 18,200,000
High 400,000 50 20,000,000 24,000,000
Annual
Sand Loss
(cy/yr)
Page 38
◆ Offshore sand for continued renourishment
▪ Mob/Demob = $1.5M
▪ Sand = $9/cy (ref: recent Marinex proposal to City of IOP)
▪ As needed
◆ Dewees Inlet Shoal Management
▪ Mob/Demob = $1.0M (assumed)
▪ Sand = $7.5/cy (assumed)
▪ 700,000 cy every 7 years (equivalent to 100,000 cy/yr – Reaches 5 and 6 only)
◆ Breach Inlet AICWW Beach Disposal
▪ No cost to the City of IOP (ref: communications between USACE and City of IOP)
▪ 150,000 cy every 3 years (equivalent to 50,000 cy/yr – Reaches 1 and 2 only)
Cost Assumptions - Sand
Page 39
◆ Rock - Effective unit cost = $275/ton (recent market conditions in SC & NC)
▪ Terminal Groin (Reach 1) ~$4.5 to $5.5M
▪ T-Groins/Breakwaters (Reach 5) ~$4 to $5M
▪ T-Groins/Breakwaters (Reach 6) ~$3.5 to $4M
◆ Geotubes – Effective unit cost = $570/ft (recent market conditions in NC)
Cost Assumptions - Structures
Page 40
◆ Planning, Engineering, and Design (PED) = 5% of construction cost
◆ Const. Engr and Inspection (CEI) = 7% of construction cost
◆ Contingency = 0% (Note: The assumed costs are based upon proposals from industry and recent market examples, so no
contingency is applied to costs.)
◆ Planning period (n) = 50 years
◆ Discount rate (i) = 3.25% (2026 USACE planning guidance)
Cost Assumptions - Other
Page 41
Cost Summary (preliminary)
Scheduled Renourishment (offshore sand sources only; baseline condition rebuilt at time of each event)
Triggered Renourishment (offshore sand sources only)
Future
Renourish-
ment
Event
Volume
(cy)
Future
Renourish-
ment
Event
Cost
($)
Supplemental
Volume from
Dewees Inlet
and AICWW
(cy)
Dewees Inlet
Shoal Mgt
($)
Breach Inlet
AICWW Beach
Disposal
($)
Terminal
Groin
(Rch 1)
($)
Average
Annual
Equivalent
Cost
(AAEC)
($/yr)
5-Yr Interval (Low) 1,629,600 18,106,368$ - -$ -$ -$ 6,344,300$
5-Yr Interval (High) 2,477,500 26,653,200$ - -$ -$ -$ 9,273,300$
7-Yr interval (Low) 2,451,000 26,386,080$ - -$ -$ -$ 6,457,800$
7-Yr Interval (High) 3,770,200 39,683,616$ - -$ -$ -$ 9,636,800$
10-Yr Interval (Low) 3,930,400 41,298,432$ - -$ -$ -$ 7,116,900$
10-Yr Interval (High) 5,988,100 62,040,048$ - -$ -$ -$ 10,612,500$
Alternative
Scheduled
Renourishment
Future
Renourish-
ment
Event
Volume
(cy)
Future
Renourish-
ment
Event
Cost
($)
Supplemental
Volume from
Dewees Inlet
and AICWW
(cy)
Dewees Inlet
Shoal Mgt
($)
Breach Inlet
AICWW Beach
Disposal
($)
Terminal
Groin
(Rch 1)
($)
Average
Annual
Equivalent
Cost
(AAEC)
($/yr)
Trigger (Low) 3-Yr Interval 909,400 10,846,752$ - -$ -$ -$ 6,151,300$
Trigger (High) 1-Yr Interval 400,100 5,713,008$ - -$ -$ -$ 9,923,100$
Triggered
Renour-
ishment
Alternative
Note: “Future nourishment event volume and “cost” applies to all renourishments after first event.
The volume of the first renourishment event is increased to offset initial losses landward of Baseline.
Page 42
Cost Summary (preliminary)
Renourishment supplemented with AICWW Beach Disposal and Dewees Shoal Mgt
Renourishment supplemented with AICWW Beach Disposal and Dewees Shoal Mgt and Terminal Groin
Note: “Future nourishment event volume and “cost” applies to all renourishments after first event.
The volume of the first renourishment event is increased to offset initial losses landward of Baseline.
Future
Renourish-
ment
Event
Volume
(cy)
Future
Renourish-
ment
Event
Cost
($)
Supplemental
Volume from
Dewees Inlet
and AICWW
(cy)
Dewees Inlet
Shoal Mgt
($)
Breach Inlet
AICWW Beach
Disposal
($)
Terminal
Groin
(Rch 1)
($)
Average
Annual
Equivalent
Cost
(AAEC)
($/yr)
5-Yr (Low) 765,600 9,397,248$ 750,000 5,320,000$ -$ -$ 5,228,200$
5-Yr (High) 1,249,700 14,276,976$ 750,000 5,320,000$ -$ -$ 7,045,200$
7-Yr (Low) 1,071,800 12,483,744$ 1,050,000 7,000,000$ -$ -$ 4,937,000$
7-Yr (High) 1,749,600 19,315,968$ 1,050,000 7,000,000$ -$ -$ 6,822,300$
Alternative
AICWW and
Dewees Inlet Mgt
Future
Renourish-
ment
Event
Volume
(cy)
Future
Renourish-
ment
Event
Cost
($)
Supplemental
Volume from
Dewees Inlet
and AICWW
(cy)
Dewees Inlet
Shoal Mgt
($)
Breach Inlet
AICWW Beach
Disposal
($)
Terminal
Groin
(Rch 1)
($)
Average
Annual
Equivalent
Cost
(AAEC)
($/yr)
ALL 5-yr (Low) 720,000 8,937,600$ 750,000 5,320,000$ -$ 4,620,000$ 5,232,200$
ALL 5-yr (High) 925,000 11,004,000$ 750,000 5,320,000$ -$ 4,620,000$ 6,062,300$
ALL 7-yr (Low) 1,008,000 11,840,640$ 1,050,000 7,000,000$ -$ 4,620,000$ 4,925,800$
ALL 7-yr (High) 1,295,000 14,733,600$ 1,050,000 7,000,000$ -$ 4,620,000$ 6,818,600$
ALL Elements
(Reaches
1, 5, and 6)
Alternative
Details
provided on
next slide
Page 43
Example of Event Cost and 50-yr Cost Stream for Computation of AAEC (preliminary)
Item Quantity Unit Cost Units Total
Dredge Mob/Demob 1 1,500,000.00$ LS 1,500,000.00$
Sand 1,227,000 9.00$ cy 11,043,000.00$
12,543,000.00$
5% 627,150.00$
7% 878,010.00$
14,048,160.00$
0% -$
14,048,160.00$
Item Quantity Unit Cost Units Total
Dredge Mob/Demob 1 1,500,000.00$ LS 1,500,000.00$
Sand 1,008,000 9.00$ cy 9,072,000.00$
10,572,000.00$
5% 528,600.00$
7% 740,040.00$
11,840,640.00$
0% -$
11,840,640.00$
Item Quantity Unit Cost Units Total
Terminal Groin 15,000 275.00$ tons 4,125,000.00$
4,125,000.00$
5% 206,250.00$
7% 288,750.00$
4,620,000.00$
0% -$
4,620,000.00$
Item Quantity Unit Cost Units Total
Dredge Mob/Demob 1 1,000,000.00$ LS 1,000,000.00$
Sand 700,000 7.50$ cy 5,250,000.00$
6,250,000.00$
5% 312,500.00$
7% 437,500.00$
7,000,000.00$
0% -$
7,000,000.00$
Contingency
Total
Restore Baseline and Replace Advance Fill with First Renourishment
subtotal Construction
PED/Permitting
CEI/Monitoring
subtotal Project
CEI/Monitoring
subtotal Project
Contingency
Total
Dewees Shoal Dredging
subtotal Construction
PED/Permitting
Total
Terminal Groin
subtotal Construction
PED/Permitting
CEI/Monitoring
subtotal Project
Contingency
Total
Contingency
Future Maintenance (Normal Advance Fill after First Renourishment)
subtotal Construction
PED/Permitting
CEI/Monitoring
subtotal Project
Total
Cost
Renourisment
Offshore Sand
and Monitoring
Terminal
Groin
Dewees
Shoal
Mgt
Cost
Escolation
Factor
Renourisment
Offshore Sand
and Monitoring
Terminal
Groin
Dewees
Shoal
Mgt
Renourisment
Offshore Sand
and Monitoring
Terminal
Groin
Dewees
Shoal
Mgt
Present
Worth
Cost
0 2026 -$ -$ -$ -$ 1260.04 -$ -$ -$ -$ -$ -$ -$
1 2027 100,000$ 100,000$ 1292.80 102,600$ -$ -$ 99,400$ -$ -$ 99,400$
2 2028 4,720,000$ 100,000$ 4,620,000$ 1326.42 105,268$ 4,863,386$ -$ 98,700$ 4,562,000$ -$ 4,660,700$
3 2029 100,000$ 100,000$ 1360.90 108,005$ -$ -$ 98,100$ -$ -$ 98,100$
4 2030 100,000$ 100,000$ 1396.29 110,813$ -$ -$ 97,500$ -$ -$ 97,500$
5 2031 100,000$ 100,000$ 1432.59 113,694$ -$ -$ 96,900$ -$ -$ 96,900$
6 2032 100,000$ 100,000$ 1469.84 116,650$ -$ -$ 96,300$ -$ -$ 96,300$
7 2033 21,048,160$ 14,048,160$ 7,000,000$ 1508.05 16,813,218$ -$ 8,377,790$ 13,440,700$ -$ 6,697,300$ 20,138,000$
8 2034 100,000$ 100,000$ 1547.26 122,795$ -$ -$ 95,100$ -$ -$ 95,100$
9 2035 100,000$ 100,000$ 1587.49 125,987$ -$ -$ 94,500$ -$ -$ 94,500$
10 2036 100,000$ 100,000$ 1628.77 129,263$ -$ -$ 93,900$ -$ -$ 93,900$
11 2037 100,000$ 100,000$ 1671.12 132,624$ -$ -$ 93,300$ -$ -$ 93,300$
12 2038 100,000$ 100,000$ 1714.56 136,072$ -$ -$ 92,700$ -$ -$ 92,700$
13 2039 100,000$ 100,000$ 1759.14 139,610$ -$ -$ 92,100$ -$ -$ 92,100$
14 2040 18,840,640$ 11,840,640$ 7,000,000$ 1804.88 16,960,521$ -$ 10,026,793$ 10,838,700$ -$ 6,407,700$ 17,246,400$
15 2041 100,000$ 100,000$ 1851.81 146,964$ -$ -$ 91,000$ -$ -$ 91,000$
16 2042 100,000$ 100,000$ 1899.96 150,786$ -$ -$ 90,400$ -$ -$ 90,400$
17 2043 100,000$ 100,000$ 1949.35 154,705$ -$ -$ 89,800$ -$ -$ 89,800$
18 2044 100,000$ 100,000$ 2000.04 158,728$ -$ -$ 89,300$ -$ -$ 89,300$
19 2045 100,000$ 100,000$ 2052.04 162,855$ -$ -$ 88,700$ -$ -$ 88,700$
20 2046 100,000$ 100,000$ 2105.39 167,089$ -$ -$ 88,100$ -$ -$ 88,100$
21 2047 18,840,640$ 11,840,640$ 7,000,000$ 2160.13 20,298,817$ -$ 12,000,341$ 10,370,000$ -$ 6,130,600$ 16,500,600$
22 2048 100,000$ 100,000$ 2216.29 175,890$ -$ -$ 87,000$ -$ -$ 87,000$
23 2049 100,000$ 100,000$ 2273.92 180,464$ -$ -$ 86,500$ -$ -$ 86,500$
24 2050 100,000$ 100,000$ 2333.04 185,156$ -$ -$ 85,900$ -$ -$ 85,900$
25 2051 100,000$ 100,000$ 2393.70 189,970$ -$ -$ 85,400$ -$ -$ 85,400$
26 2052 100,000$ 100,000$ 2455.94 194,910$ -$ -$ 84,900$ -$ -$ 84,900$
27 2053 100,000$ 100,000$ 2519.79 199,977$ -$ -$ 84,300$ -$ -$ 84,300$
28 2054 18,840,640$ 11,840,640$ 7,000,000$ 2585.30 24,294,155$ -$ 14,362,322$ 9,921,600$ -$ 5,865,500$ 15,787,100$
29 2055 100,000$ 100,000$ 2652.52 210,511$ -$ -$ 83,300$ -$ -$ 83,300$
30 2056 100,000$ 100,000$ 2719.73 215,845$ -$ -$ 82,700$ -$ -$ 82,700$
31 2057 100,000$ 100,000$ 2788.65 221,314$ -$ -$ 82,100$ -$ -$ 82,100$
32 2058 100,000$ 100,000$ 2859.31 226,922$ -$ -$ 81,500$ -$ -$ 81,500$
33 2059 100,000$ 100,000$ 2931.77 232,672$ -$ -$ 81,000$ -$ -$ 81,000$
34 2060 100,000$ 100,000$ 3006.06 238,568$ -$ -$ 80,400$ -$ -$ 80,400$
35 2061 18,840,640$ 11,840,640$ 7,000,000$ 3082.23 28,963,793$ -$ 17,122,939$ 9,455,900$ -$ 5,590,200$ 15,046,100$
36 2062 100,000$ 100,000$ 3160.33 250,812$ -$ -$ 79,300$ -$ -$ 79,300$
37 2063 100,000$ 100,000$ 3240.41 257,167$ -$ -$ 78,800$ -$ -$ 78,800$
38 2064 100,000$ 100,000$ 3322.52 263,684$ -$ -$ 78,200$ -$ -$ 78,200$
39 2065 100,000$ 100,000$ 3406.71 270,365$ -$ -$ 77,700$ -$ -$ 77,700$
40 2066 100,000$ 100,000$ 3493.03 277,216$ -$ -$ 77,100$ -$ -$ 77,100$
41 2067 100,000$ 100,000$ 3581.55 284,241$ -$ -$ 76,600$ -$ -$ 76,600$
42 2068 18,840,640$ 11,840,640$ 7,000,000$ 3672.30 34,508,733$ -$ 20,401,020$ 9,006,300$ -$ 5,324,400$ 14,330,700$
43 2069 100,000$ 100,000$ 3765.35 298,828$ -$ -$ 75,500$ -$ -$ 75,500$
44 2070 100,000$ 100,000$ 3860.77 306,400$ -$ -$ 75,000$ -$ -$ 75,000$
45 2071 100,000$ 100,000$ 3958.60 314,164$ -$ -$ 74,500$ -$ -$ 74,500$
46 2072 100,000$ 100,000$ 4058.90 322,125$ -$ -$ 74,000$ -$ -$ 74,000$
47 2073 100,000$ 100,000$ 4161.75 330,287$ -$ -$ 73,500$ -$ -$ 73,500$
48 2074 100,000$ 100,000$ 4267.21 338,657$ -$ -$ 73,000$ -$ -$ 73,000$
49 2075 18,840,640$ 11,840,640$ 7,000,000$ 4375.34 41,115,218$ -$ 24,306,670$ 8,578,100$ -$ 5,071,200$ 13,649,300$
50 2076 100,000$ 100,000$ 4486.21 356,037$ -$ -$ 71,900$ -$ -$ 71,900$
75,287,200$ 4,562,000$ 41,086,900$ 120,936,100$
3.25% 3.25% 3.25% 3.25%
50 50 50 50
0.04073 0.04073 0.04073 0.04073
3,066,500$ 185,800$ 1,673,500$ 4,925,800$ Avg Annual Equivalent Cost
Year
Base Costs Escalated Costs Present Worth
Total Present Worth
Discount Rate
Amortization Period (years)
Capital Recovery Factor
EVENT COST
COST STREAM
AAEC
Example is for 7-Year periodic renourishment, sand contributions from Dewees Inlet shoal and AICWW (Breach Inlet), and Terminal Groin (Reach 1)
Page 44
Cost Summary - Comments
◆ Cost-effectiveness benefits derived from…
▪ Frequent, no cost sand from USACE AICWW Maintenance dredging
▪ Potentially lower cost sand from Dewees Inlet shoal management
compared to cost of sand from offshore
▪ Reduced sand loss from terminal groin at southern end of the island
Page 45
◆ Establish/Confirm Beach Management Baseline
◆ Prioritize beach management practices that provide best
opportunities to maintain baseline conditions at all times
◆ Prioritize management practices that minimize cost
Future Management
Page 46
◆ Establish appropriate beach management baseline
◆ Pursue agreement with Marinex for proposed renourishment pricing
◆ Pursue agreement with USACE to provide beach compatible sand to Reaches
1 and 2 from Breach Inlet AICWW Maintenance Dredging
◆ Investigate in more detail the feasibility, scope and cost of Dewees Inlet Shoal
Management (Consider a test project)
◆ Investigate in more detail the feasibility, scope, and cost of a Terminal Groin
at the southern end of Reach 1
◆ Consider last line of defense structural solutions in Reaches 5 and 6 to
compliment Dewees Inlet Shoal Management
Recommendations for Consideration
City of Isle of Palms
Beach Preservation Committee
Beach Management
Alternatives Analysis – Findings Discussion
September 2, 2026
1
City of Isle of Palms
Request for Proposals (RFP 2026-11)
Beach Management Projects Preliminary Engineering and Scoping
Requirement. The City of Isle of Palms (“City”) requests proposals from qualified coastal engineering
firms to perform preliminary engineering and feasibility assessments for two potential beach
management projects: (1) a terminal groin at the southern end of the Isle of Palms near Breach Inlet in
Reach 1, and (2) a Dewees Inlet shoal management project serving the northern end of Isle of Palms,
principally Reaches 5 and 6. These reach designations are shown in the supplied references. Firms are
requested to propose both projects. A proposal addressing only one project will, nevertheless, still be
considered. The City may select one firm for both projects, separate firms, or no firm.
This solicitation seeks decision-ready, planning-level engineering analyses and cost estimates. This
engagement excludes final design, submission of permit applications, and construction, including
construction of a test project. A selected firm may be considered for later work under a separate
authorization or procurement, at the City’s discretion. No later phase is guaranteed.
BACKGROUND
Foth | Olsen presented its Beach Management Alternatives Analysis to City Council on September 22,
2026. Its recommendations include further investigation of the feasibility, scope, and cost of a terminal
groin at the southern end of Reach 1 and of a shoal management project at the Dewees Inlet shoal,
potentially including a test project. The presentation’s structure dimensions, sand volumes, performance
estimates, intervals, and cost assumptions are conceptual. Proposers should evaluate them, not treat
them as approved designs or guaranteed outcomes.
The Foth | Olsen presentation is a reference document for this RFP. Additionally, the City intends to
include Foth’s final written report and the most recent beach monitoring report when available [currently
stated to be ready on 9 OCT]; the final reference list is to be confirmed. Proposers shall identify
additional data they need and avoid duplicating reliable existing work.
SCOPE OF WORK AND SERVICES - OVERVIEW
For each project awarded, the selected firm shall prepare a preliminary engineering assessment and
project implementation plan sufficient for the City to understand feasibility, major risks, likely approvals,
planning-level costs, schedule, and the next major decision point(s). In the proposal, identify the field
investigations, analyses, environmental studies, public engagement, and regulatory coordination
proposed for this engagement, and the resulting data and findings the City will receive. Distinguish this
work from studies and services recommended for later phases. The selected firm shall perform the work
agreed in the contract and deliver the resulting data and findings. Explain which work is essential now,
which can be deferred, and what would cause the City to stop or change course. The firm shall propose
a regular cadence of staff coordination and progress reporting, including at least monthly In Progress
Reviews (IPRs) with City staff.
The end state is a separate preliminary engineering report and executive briefing for each project,
presenting the planning-level analyses and cost estimates the City needs to decide whether to proceed
to design and permitting, obtain specified additional information, or modify or discontinue the project.
Each report shall present the recommended concept and design considerations, potential impacts,
risks, unresolved questions, and cost ranges with their assumptions. Its implementation plan shall
identify the studies, approvals, design work, schedule, and City decisions needed before construction
bidding. Address regulatory feasibility and property and access constraints, including potential barriers,
2
required permissions, and information needed to resolve them. Support each recommendation with
engineering findings; identify the information needed to resolve any uncertainty that prevents a
decision. Deliver a draft report and implementation plan for City review, then final versions addressing
City comments. Provide reports and plans in PDF and editable formats, supporting data and analysis
files in their native or commonly usable formats, and briefing slides in PDF and editable formats. Include
one executive presentation per project to City Council or its designated committee, with staff
coordination through the IPRs. Final design, permit applications, test-project construction, and
construction bid packages are outside this initial engagement.
PROJECT 1 TERMINAL GROIN AT SOUTHERN END OF REACH 1
Evaluate whether a terminal groin or similar structure can reduce sand loss and support the City’s
beach management goals at the southern end of Isle of Palms. Examine existing beach and inlet
conditions; plausible structure locations, configurations, and materials; interaction with nourishment;
construction access; expected performance; maintenance; and effects under a no-action comparison.
Assess potential changes to erosion, accretion, sediment transport, inlet morphology, navigation, and
habitat on Isle of Palms, within Breach Inlet, and at Sullivan’s Island and other potentially affected
areas. Explain uncertainties, methods, and the additional work needed to establish and address
impacts.
For Project 1, submit completed Grid A (A1–A9) in Appendix 1, Pricing. Use the grid to summarize fees,
future cost estimates, and their basis. Explain the technical approach in the proposal narrative and
cross-reference it by element identifier; do not repeat the narrative in the grid. The pricing instructions
below apply to both grids.
Work element Proposed fee for current
work Later cost estimate Cost basis and exclusions
A1. Preliminary engineering and
feasibility Fee estimate Future work range, if any
Data, concept refinement,
surveys, modeling, and
deliverables
A2. Downdrift and adjacent-area
impacts Fee estimate Follow-on study range IOP, Breach Inlet, Sullivan’s
Island, waterways, habitat
A3. Design costs and factors Scoping fee, if any Preliminary and final
design range
Structure options, dimensions,
geotechnical needs,
nourishment
A4. Permitting and environmental
review
Scoping fee, if any Studies and permit-phase
range
Likely approvals, sequence,
agency consultation,
uncertainty
A5. Construction administration and
inspection Scoping fee, if any Future services range Duration, field staffing,
observation, testing, reporting
A6. Construction and initial
nourishment Estimating fee, if any Capital range Quantities, unit rates, access,
mobilization, contingency
A7. Monitoring, maintenance, and
adaptive action Scoping fee, if any Annual and event range
Surveys, performance
measures, repair, sand bypass
needs
A8. Other critical factors Fee estimate Future cost range Identify risks, dependencies,
exclusions, and allowances
A9. Total current engagement cost Base fee + estimated
reimbursables = total N/A Itemize reimbursables; optional
tasks excluded
3
PROJECT 2 DEWEES INLET SHOAL MANAGEMENT FOR REACHES 5 AND 6
Evaluate the feasibility of intercepting suitable sand within the shoal system adjacent to Dewees Inlet
and placing it along the north end of Isle of Palms, principally Reaches 5 and 6. Assess potential borrow
areas, sediment compatibility and availability, shoal movement and inlet dynamics, dredge access and
methods, placement locations, project volume and frequency, potential test project, and integration with
other beach work. Examine potential effects on Isle of Palms, Dewees Island, the inlet and adjacent
waterways and land masses, navigation, habitat, and neighboring shorelines. Assess possible borrow
and placement configurations against existing conditions and identify the information needed to define
an initial project.
For Project 2, submit completed Grid B (B1–B10) in Appendix 1, Pricing, using the same instructions as
Grid A. Address B3 as a separate test-project scenario: propose the preliminary work needed to assess
and scope a test, estimate its possible later implementation costs, or explain why a test is not
recommended. B4–B8 shall describe the larger shoal management project. Explain whether the test
would be additional to, substitute for, or contribute to that project; identify shared costs and do not add
overlapping test and larger-project estimates together.
Work element Proposed fee for current
work Later cost estimate Cost basis and exclusions
B1. Preliminary engineering and
feasibility Fee estimate Future work range, if any
Shoal mapping, sediment,
dredge access, placement
options
B2. Downdrift and adjacent-area
impacts Fee estimate Follow-on study range IOP, Dewees Island, inlet,
waterways, habitat
B3. Test project Scoping fee, if any Design, permits, build, and
monitoring ranges
Candidate scale, objectives,
decision criteria; or rationale
against test
B4. Design costs and factors Scoping fee, if any Preliminary and final
design range
Borrow limits, fill template,
volumes, equipment,
sequencing
B5. Permitting and environmental
review Scoping fee, if any Studies and permit-phase
range
Likely approvals, agency
consultation, constraints
B6. Construction administration and
inspection
Scoping fee, if any Future services range Dredging and placement
oversight, surveys, reporting
B7. Construction and sand placement Estimating fee, if any Capital range per event Mob/demob, cubic-yard pricing,
contingency, frequency
B8. Monitoring, maintenance, and
adaptive action Scoping fee, if any Annual and event range Shoal/shoreline response,
sediment budget, triggers
B9. Other critical factors Fee estimate Future cost range Identify risks, dependencies,
exclusions, and allowances
B10. Total current engagement cost Base fee + estimated
reimbursables = total N/A Itemize reimbursables; optional
tasks excluded
Pricing instructions. “Proposed fee for current work” is the estimated fee for this preliminary engineering
engagement; state whether pricing is fixed or time and materials. “Later cost estimate” is a planning-
level estimate for a future phase or construction. Base proposal-stage estimates on available
information and stated assumptions. No new field work, modeling, or studies are required to prepare a
proposal. If a future cost cannot yet be estimated reliably, explain what information is needed. The
selected firm shall refine these estimates during the assessment.
For future costs, provide low, most-likely, and high ranges where practicable, with the price year,
available quantities or unit rates, contingency, escalation assumptions, and cost drivers. Identify shared
4
tasks, services by others, and combined-project savings. Price each current task once; cross-reference
any fee included in another element. A9 and B10 shall show the base professional fee, estimated
reimbursables, and total estimated current-engagement cost. Include required subconsultant and other
current costs in that total and identify their basis. Show optional tasks separately, excluded from the
base total. No City-imposed not-to-exceed budget is specified.
PROPOSAL CONTENTS AND SUBMITTAL INSTRUCTIONS
Consistent with the City’s procurement procedures, the City seeks evidence of professional and
technical qualifications, demonstrated competence, and a practical approach to the work. Issue date: to
be confirmed. Proposal submission deadline: to be confirmed. Submit one hard copy in a sealed
envelope marked “RFP 2026-11 - Beach Management Projects Preliminary Engineering and Scoping.”
Physical Address Instructions (Delivery by Courier or Mail Service such as FEDEX):
C/o Douglas Kerr
City Administrator
City of Isle of Palms
1207 Palm Boulevard
Isle of Palms, South Carolina 29451
Mailing Instructions (US Mail):
C/o Douglas Kerr
City Administrator
City of Isle of Palms
Post Office Box 508
Isle of Palms, South Carolina 29451
Questions shall be submitted by email to Deputy City Administrator Sean Kuester at
skuester@isleofpalms.gov. Question deadline: to be confirmed. Answers will be issued by addendum
on the City’s Requests for Bids and Proposals webpage. Questions sent after the deadline will not be
answered. Proposers are responsible for reviewing all addenda and shall acknowledge each addendum
in their proposal.
PROPOSAL REQUIREMENTS
The narrative portion should not exceed twenty pages (approximately ten pages per project). The cost
grids, pricing information, resumes, relevant project examples, and references may be appended and
will not count against the twenty-page limit. A proposal for one project shall clearly identify that project.
At a minimum, include:
1. Cover Letter. Authorized representative(s); identify the project or projects proposed; Executive
Summary at discretion.
2. Qualifications. Describe the firm’s qualifications and proposed team, highlighting experience in
coastal engineering, inlet and sediment analysis, modeling, environmental review, permitting, and
similar projects in South Carolina.
3. Project Approach. Describe the overall approach, then explain how each applicable scope
requirement will be addressed. Use A/B identifiers to connect the narrative to the grids; cross-
references may replace repeated content. Address technical methods, existing information, field
investigations and modeling, impacts, project concept and design considerations, public
engagement, regulatory coordination, and City decision points. Distinguish current work from later
phases. Describe the preliminary engineering report, implementation plan, executive briefing, and
supporting data and files the City will receive. Explain how the findings will support a decision to
5
proceed, obtain additional information, or modify or discontinue the project. Explain the basis for
any recommended change to the project concept.
4. Timeline and Coordination. Provide a schedule for each project, critical dependencies, agency
coordination, anticipated City decisions or data needs, staff meeting cadence, and progress
reporting. Include milestones for draft delivery, City review, final delivery, and the executive
presentation. Proposers should anticipate at least monthly In Progress Reviews (IPRs) with City
staff to keep staff abreast of the project’s progress.
5. Disclosures. Disclosure of current or recent roles on the City’s beach program or with other
potentially affected interests, with an approach to maintaining independent analysis.
A. Appendix 1. Pricing. Submit completed Grid A and/or Grid B with a supporting pricing narrative
organized by the same element identifiers. Follow the pricing instructions under Scope of Work and
Services. Provide hourly rates, reimbursables, subconsultant costs, exclusions, optional tasks, and
combined-project savings. Explain whether taxes, travel, field work, laboratory services, and agency
fees are included in the base fee or estimated reimbursables; include all required current costs in
the total. Identify the supporting data and files included in the proposed fee. Cross-reference
technical methods and schedules in the proposal narrative instead of restating them here.
B. Appendix 2. Resumes. These are in addition to the more broad “qualifications” section. At proposer
discretion, list individual resumes.
C. Appendix 3. Relevant Work and References. At least three comparable projects with client
contacts.
EVALUATION PROCESS AND CRITERIA
The City may evaluate the projects separately and may interview firms, request clarification, negotiate
scope and price, or decline to award. Evaluation will consider at least: understanding of the particular
shoreline and inlet systems; quality and independence of the proposed investigation and impact
methods; relevant project and permitting experience; qualifications and availability of the named team;
clarity of deliverables and schedule; and value and transparency of the proposed fees and planning-
level cost estimates. The City reserves the right to reject any or all proposals, waive minor irregularities,
and cancel the solicitation if in its best interest. Additional evaluation criteria may be applied at the City’s
discretion.
GENERAL SUBMISSION TERMS
Deadline for Submissions: to be confirmed. Proposals will be received by mail or courier in a sealed
envelope clearly marked with the RFP number and title and containing one hard copy. It is the
responsibility of proposers to verify receipt by the City. No proposal will be considered unless actually
received by the City at the stated place, date, and time. The City is not responsible for any failure,
misdirection, delay, or error resulting from the proposer’s selected delivery method. All proposals shall
include a current email address.
Proprietary and/or Confidential Information: Proposals are public documents under the South Carolina
Freedom of Information Act, except for information determined by the City to qualify for an exception to
disclosure. All information claimed to be confidential or proprietary must be clearly identified. Each page
containing such information, in whole or in part, must be marked CONFIDENTIAL in bold type of at
least 12 points in the upper-right corner. All information not so identified will be subject to disclosure by
the City.
6
Proposers acknowledge that the City will not be liable for costs, expenses, losses, damages, or
liabilities incurred in preparing or submitting a proposal, negotiating changes, or as a result of
acceptance, nonacceptance, or rejection of proposals. Proposers are responsible for accurate,
adequate, and clear responses. Neither issuance of this RFP nor receipt and evaluation of a response
commits the City to award a contract. Proposers must have or be able to obtain an Isle of Palms
business license.
REFERENCE DOCUMENTS
• Reference 1. Foth | Olsen, Beach Management Alternatives Analysis, presentation to City Council,
September 22, 2026, including the project concepts and recommendations on slide 40. To be
supplied with this RFP.
• Reference 2. Foth | Olsen final written report. Title, date, and availability: to be confirmed.
• Reference 3. Most recent City beach monitoring report. Title, date, and availability: to be confirmed.
1
Douglas Kerr
From: Scott Finnis <sfinnis@coastalscience.com>
Sent: Tuesday, September 29, 2026 11:37 AM
To: Douglas Kerr; Sean Kuester; Andrew P. Schumacher
Cc: Steven Traynum
Subject: IOP Sand Fencing Plan Draft
Attachments: 2623-IOP Sand Fencing Plan_compressed.pdf
All,
Attached is the sand fencing and vegetation plan draft given the updated budget. Let me know if you want
to discuss these plans further, possibly after our weekly meeting on Thursday. Below is a recap of what is
suggested and why each reach:
Reaches 1 and 2: Given the full budget for Reaches 1 and 2 the design doesn't change all that much.
Vegetation is still the same spacing at 18" on center between each plant and has the same plant
variation that was specified in the bid. This covers the same 40 feet of dune that was suggested in
previous iterations. For fencing in Reach 1 it extends the whole dune, with the exception of some
sections removed from where prominent walkways are. This fencing has been moved to cover the area
where the dune wasn't built further east. For fencing in Reach 2 it extends the whole with sections
removed at walkovers. These sections have been moved in front of Grand Pavilion where a dune exists
but can benefit from fencing.
Reach 3: Due to the decreased budget, the spacing between vegetation has been adjusted to 24" on
center while still covering the 40 feet of dune width. For fencing we concentrated on fencing further north
of the fill where the dune was not built, as we felt these areas would best benefit from fencing. The
fencing has been spaced so that there is plenty of access with homes and public walkways. There is
some variation for Reach 3 on if fencing is removed from certain areas it may free up more money to add
more vegetation. This rewuires input from the City on what they want to do with fencing here.
Let me know if you guys want to go over this Thursday or on a different meeting.
Thanks,
Scott Finnis
Coastal Engineer at Coastal Science & Engineering, Inc.
Phone 973-713-2917
Web www.coastalscience.com
Email sfinnis@coastalscience.com
PO 8056, Columbia, SC 29202
300+00 310+00
320+00330+00328+00
SeascapeOcean ClubSeascapeOcean ClubPort O CallSeascapeOcean Club
Sand Fencing PlanSBTSF28 Sept 2026PROJECT #:APPROVED BY:DRAWN BY:DATE:SHEET NO:SCALE:AS SHOWNSF1PROJECT:DRAWING TITLE:CLIENT:CITY OF ISLE OF PALMS1207 PALM BLVD.ISLE OF PALMS SC 29451FSNACERTIETACIOUTHCAROLIOFCOASTALSCIENCE& ENGINEERINGNo. C01950RAUTHOITAZION
Survey Datum:Horizontal: NAD83 South Carolina State Planes, International FootVertical: NAVD '88 (Feet)Photo: 5 February 2026 by Coastal Science & EngineeringData Collected: June 2026KEYNOTEConstruction AccessStaging AreaDaily ParkingWalkoverASP 2623Beach Nourishment Project
0100Scale (Feet)
Vegetated Dune CrestVegetated Dune SlopeSand Fence
15' Dune Crest(Typical)Dune Plan View(Typical Newly Constructed Dune @ +13 ft NAVD)
Slope
Dune Crest (Shaded Area)Seaward Dune Crest LimitDune Slope (1 on 4)
Dune Section View(Typical Newly Constructed Dune @ +13 ft NAVD)
Slope
Landward Dune Crest Limit60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 18" O.C. (Typical)
W
Slope
Slope
Fence Post (3" Typical)"V" Sand Fence (Typical)6' - 0" Apart10'
"V" Fence SectionWith Interior Angleof 120°
25'15' Dune Crest@ +13 ft NAVDSeaward Dune Crest Limit60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 18" O.C. (Typical)Newly Constructed DuneLandward /Backshore
Vegetated Dune CrestVegetated Dune SlopeSand FenceVegetated Dune CrestVegetated Dune SlopeSand FenceVegetated Dune CrestVegetated Dune SlopeSand Fence Reach 1Linear Footage of Dune: ~2,750 lfS
S
WW WW W
Dune CrestDune Slope
Interior Angle of 120° 10'Seaward Toe of Dune
240+00 250+00 260+0057th Ave
57th Ave57th Ave Grand Pavilion
Beachwood East
Beachwood EastDunecrest Ln
Sand Fencing PlanSBTSF28 Sept 2026PROJECT #:APPROVED BY:DRAWN BY:DATE:SHEET NO:SCALE:AS SHOWNSF2PROJECT:DRAWING TITLE:CLIENT:CITY OF ISLE OF PALMS1207 PALM BLVD.ISLE OF PALMS SC 29451FSNACERTIETACIOUTHCAROLIOFCOASTALSCIENCE& ENGINEERINGNo. C01950RAUTHOITAZION
Survey Datum:Horizontal: NAD83 South Carolina State Planes, International FootVertical: NAVD '88 (Feet)Photo: 5 February 2026 by Coastal Science & EngineeringData Collected: June 2026KEYNOTEConstruction AccessStaging AreaDaily ParkingWalkoverASP 2623Beach Nourishment Project
0100Scale (Feet)
SA
Vegetated Dune CrestVegetated Dune SlopeSand Fence
15' Dune Crest(Typical)Dune Plan View(Typical Newly Constructed Dune @ +13 ft NAVD)
SlopeSeaward Dune Crest Limit
Slope
Landward Dune Crest Limit
W
Slope
Slope
WWWWWW
Vegetated Dune CrestVegetated Dune SlopeSand Fence
Vegetated Dune CrestVegetated Dune SlopeSand Fence Vegetated Dune CrestVegetated Dune SlopeSand Fence
W WWWWW
W
W
Reach 2Linear Footage of Dune: ~3,625 lf
Dune CrestDune Slope
Dune Crest (Shaded Area)
Dune Slope (1 on 4)
60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 18" O.C. (Typical)
Dune Section View(Typical Newly Constructed Dune @ +13 ft NAVD)
"V" Fence SectionWith Interior Angleof 120°
25'15' Dune Crest@ +13 ft NAVDSeaward Dune Crest Limit60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 18" O.C. (Typical)Newly Constructed DuneLandward /Backshore
Fence Post (3" Typical)"V" Sand Fence (Typical)6' - 0" Apart10' Interior Angle of 120° 10'Seaward Toe of Dune
0+00
10+00
20+00
30+0040+00
50+00
60+00
70+00
80+00
90+00
Sand Fencing PlanSBTSF28 Sept 2026PROJECT #:APPROVED BY:DRAWN BY:DATE:SHEET NO:SCALE:AS SHOWNSF3PROJECT:DRAWING TITLE:CLIENT:CITY OF ISLE OF PALMS1207 PALM BLVD.ISLE OF PALMS SC 29451FSNACERTIETACIOUTHCAROLIOFCOASTALSCIENCE& ENGINEERINGNo. C01950RAUTHOITAZION
Survey Datum:Horizontal: NAD83 South Carolina State Planes, International FootVertical: NAVD '88 (Feet)Photo: 5 February 2026 by Coastal Science & EngineeringData Collected: June 2026KEYNOTEConstruction AccessStaging AreaDaily ParkingWalkoverASP 2623Beach Nourishment Project
0300Scale (Feet)
Vegetated Dune CrestVegetated Dune SlopeSand Fence
Dune Plan View(Typical Newly Constructed Dune @ +13 ft NAVD)
W
WWW W
A
A
SP P P
Vegetated Dune CrestVegetated Dune SlopeSand Fence
Vegetated Dune CrestVegetated Dune Slope
Sand Fence
Dune CrestDune Slope
Reach 3Linear Footage of Dune: ~6,300 lfDune Section View(Typical Newly Constructed Dune @ +13 ft NAVD)25'15' Dune Crest@ +13 ft NAVDSeaward Dune Crest Limit60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 24" O.C. (Typical)Newly Constructed DuneLandward /Backshore
60% Sea Oats30% Bitter Panic Grass10% Morning GloryPlanted 24" O.C. (Typical)
No Dune
15' Dune Crest(Typical)
SlopeSeaward Dune Crest Limit
Slope
Landward Dune Crest Limit
Slope
Slope
Dune Crest (Shaded Area)
Dune Slope (1 on 4)Fence Post (3" Typical)"V" Sand Fence (Typical)6' - 0" Apart10' Interior Angle of 120°10'Seaward Toe of Dune
WW WW WAP PA SS
"V" Fence SectionWith Interior Angleof 120°