PLANNING COMMISSION
September 9, 2026
The public may view the public meeting at:
28TU28TUwww.youtube.com/user/cityofisleofpalmsU28TU28T
Public Comment: Citizens may provide public comment here:
https://www.isleofpalms.gov/public-comment-form
AGENDA
The Isle of Palms Planning Commission will hold its regular meeting on
Wednesday, September 9, 2026, at 4:00 p.m. in Council Chambers of City Hall,
1207 Palm Boulevard.
A. Call to order and acknowledgment that the press and the public were duly
notified in accordance with state law.
B. Approval of minutes- August 12, 2026
C. Discussion of commercial district parking requirements
D. Discussion of Isle of Palms Mobility Study by BCD Council of Government
E. Miscellaneous business
F. Adjourn
1
Planning Commission Meeting
4:00pm, Wednesday, August 12, 2026
1207 Palm Boulevard, Isle of Palms, SC and
broadcasted live on YouTube: https://www.youtube.com/user/cityofisleofpalms
MINUTES
1. Call to Order
Present: Ron Denton, Bill Laughlin, Sandy Stone, Tim Ahmuty, Rich Steinert
Absent: Sue Nagelski, Jeffrey Rubin
Staff present: Administrator Kerr
2. Approval of minutes
MOTION: Mr. Stone made a motion to approve the minutes of the July 8, 2026 meeting.
Mr. Steinert seconded the motion. The motion passed unanimously.
3. Discussion of commercial district parking requirements
Administrator Kerr provided the Commission with background on a matter referred by City
Council regarding the proposed reconstruction of the Acme restaurant. He advised that the
property owners had approached Council with two requests related to the project.
The first request concerns continued operation of the business, without staff layoffs, during the
construction period, estimated at approximately one year or slightly less. As the Zoning
Ordinance requires operational businesses to maintain a specified level of parking at all times,
Administrator Kerr noted that an agreement permitting temporary use of the municipal parking
lot during construction would likely resolve this issue, and that a mechanism for such an
arrangement may already exist within the existing code. He indicated Council appeared willing
to consider this option.
The second request, which Council has specifically referred to the Planning Commission for
review, is for a general reduction in the parking requirement applicable to the restaurant. The
Administrator summarized the applicant's rationale as follows: (1) the GC2 zoning district
(Ocean Boulevard), located nearby, imposes no parking requirement and in fact prohibits parking
on "skinny lots"; and (2) a significant portion of the restaurant's patronage arrives on foot from
nearby hotels and condominiums rather than by vehicle, which the applicant contends supports a
differentiated parking standard.
Planning Commission, 8/12/2026
He further explained that parking capacity directly determines allowable restaurant size under the
Zoning Ordinance, which ties permitted capacity to the number of seats and the number of
employees on a maximum shift. He noted that the applicant has historically been aware that
available parking constrains the scale of its operations.
City Council's intent in referring the item to the Planning Commission was to obtain an
independent, informed review of the request given the Commission's familiarity with the zoning
code and building regulations, rather than to direct a particular outcome.
Mr. Simons of Acme Restaurant explained to the Commissioners his preference for a 250-seat
restaurant that would include space for private events.
Commissioners discussed several options, including the ideas prepared by Mr. Laughlin in the
document attached to the minutes, “Potential Front Beach Zoning and Parking Adjustments.”
Administrator Kerr encouraged the Commissioners to think on the issue for the next month.
They will discuss the matter at the September meeting in the hopes of sending a recommendation
to City Council for consideration.
4. Discussion and consideration of residential lighting ordinance
Administrator Kerr reminded the Commission of the work they did on a previous lighting
ordinance. He shared that City Council has expressed a preference for the version in the meeting
packet that no longer includes the amendments suggested by the Commission.
Mr. Laughlin suggested changing “shining directly onto” to “illuminating and “shine directly
onto” to illuminate.
MOTION: Mr. Laughlin made a motion to recommend the amended version of the
ordinance to City Council for consideration. Mr. Denton seconded the motion. A vote was
taken as follows:
Ayes: Denton, Ahmuty, Laughlin, Steinert, Nagelski
Nays: Stone
The motion passed 5-1.
5. Miscellaneous
The next meeting of the Planning Commission will be Wednesday, September 9, 2026 at
4:00pm.
Planning Commission, 8/12/2026
6. Adjournment
Mr. Laughlin made a motion to adjourn, and Mr. Steinert seconded the motion. The meeting was
adjourned at 5:19pm.
Respectfully submitted,
Nicole DeNeane
City Clerk
Potential Front Beach Zoning and Parking Adjustments
by BL 8/11/2026
Part 1 – Reduce Restaurant Parking Requirements in GC-2 (Front Beach)
Sec. 5-4-113. Application of parking requirements.
(g) Requirements for GC-2 district. Notwithstanding any other provision of this chapter to
the contrary, off-street parking is permitted within the GC-2 district on any lot which
contains at least one hundred twenty feet (120') of frontage on a public street. Any
automobile parking pursuant to this section shall comply with the provisions of section 5-
4-12(n) and (o). There shall be no off-street parking permitted for any lot
within the GC-2 district which contains less than one hundred twenty feet
(120') of frontage on a public street. The minimum number of required
parking spaces for restaurant uses within the GC-2 district shall be fifty
percent (50%) of the number otherwise required by Section 5-4-112. Where
the resulting calculation contains a fraction, the required number shall be
rounded up to the next whole number.
Examples of impact of 50% Reduction:
• 150 seats + 15 employees = 22 required spaces
• 250 seats + 15 employees = 34 required spaces
• 350 seats + 15 employees = 47 required spaces
Part 2 – Expand the GC-2 (Front Beach) District
Scenario 1 — Gateway approach
If the objective were to create a more consistent commercial
gateway into Front Beach, what should the GC-2 boundary
include?
Scenario 2 — Limited approach
If the objective were to consider only the immediate commercial
area along J.C. Long Boulevard, what should the GC-2 boundary
include?
*** This is a conceptual discussion exhibit only — not a
proposed ordinance or rezoning recommendation.
(a)
(1)
a.
b.
(2)
(3)
a.
b.
c.
d.
(4)
(5)
(b)
(1)
a.
b.
(2)
(3)
Sec. 5-4-36. - GC-1 and GC-3 general commercial districts.
In addition to all other applicable requirements of this chapter and other City ordinances, the
requirements for the GC-1 district are as follows:
Purpose. The purpose of the GC-1 general commercial district is:
To encourage the development of a less densely constructed, economically healthy
business environment with family-oriented businesses directed primarily to island
residents in buildings designed and sited to accommodate automobile and pedestrian
traffic.
To discourage uses which generate noise, vibration, glare, dust and odor or are offensive
to the health, safety and morals of a residential, family-oriented community.
Permitted uses. See section 5-4-38 for uses permitted in the GC-1 general commercial district.
Minimum yard requirements. Minimum yard requirements in the GC-1 general commercial
district are as follows:
Front yard: Zero feet (0').
Side yard: Ten feet (10').
Rear yard: Fifteen feet (15').
Lot frontage: Twenty feet (20') on a public or private street.
Vehicle access to the lot from a public or private street shall be provided within the required
lot frontage.
Maximum height. The maximum height in the GC-1 general commercial district shall be forty
feet (40').
Additional development requirements. Refuse containers shall be screened from public view
with materials compatible with principal structure or landscaping.
In addition to all other applicable requirements of this chapter and other City ordinances, the
requirements for the GC-3 district are as follows:
Purpose. The purpose of the GC-3 general commercial district is:
To encourage the development of a less densely constructed, economically healthy
business environment with family-oriented businesses directed primarily to island
residents in buildings designed and sited to accommodate automobile and pedestrian
traffic, and to allow development of single-family dwellings subject to certain restrictions.
To discourage uses which generate noise, vibration, glare, dust and odor or are offensive
to the health, safety and morals of a residential, family-oriented community.
Permitted uses. See section 5-4-38 for uses permitted in the GC-3 general commercial district.
11/08/2026, 16:12 Isle of Palms, SC Code of Ordinances
about:blank 1/3
a.
b.
c.
d.
(4)
(5)
a.
b.
(1)
(a)
(b)
(2)
(3)
(a)
(b)
Minimum yard requirements. Minimum yard requirements in the GC-3 general commercial district are as
follows:
Front yard: Twenty-five feet (25').
Side yard: Ten feet (10').
Rear yard: Fifteen feet (15').
Lot frontage: Twenty feet (20') on a public or private street.
Vehicle access to the lot from a public or private street shall be provided within the required
lot frontage.
Maximum height. The maximum height in the GC-3 general commercial district shall be forty
feet (40').
Additional development requirements. Additional development requirements in the GC-3
general commercial district are as follows:
Refuse containers shall be screened from public view with materials compatible with
principal structure or landscaping.
See section 5-4-38(12) for additional regulations regarding single-family dwellings.
(Ord. No. 2015-15, § 1, 2-23-2016)
Sec. 5-4-37. - GC-2 General commercial district.
Purpose.
To encourage the development of densely constructed, economically healthy business
environment with family-oriented businesses directed primarily to island residents and
beach goers in buildings designed and sited to primarily accommodate the pedestrian
traffic of the front beach commercial area.
To discourage uses which are inherent generators of noise, vibration, glare, dust and odor
or are offensive to the health, safety and morals of a residential, family-oriented
community.
Permitted uses. See section 5-4-38.
Minimum yard requirements.
No part of a structure, with the exception of permitted dune walkovers, shall be located
seaward more than two hundred (200) feet from the right-of-way of Ocean Boulevard. No
other setbacks are required, provided that the structures comply with the requirements
established for the City's fire district.
Lot frontage: 15 feet on a public or private street. Vehicle access to the lot from a public or
private street, if provided, shall be located within the required lot frontage.
11/08/2026, 16:12 Isle of Palms, SC Code of Ordinances
about:blank 2/3
(4)
(5)
Maximum height: 40 feet.
Additional development requirements. Refuse containers shall be screened from public view with
materials compatible with principal structure or landscaping.
(Ord. No. 2015-15, § 1, 2-23-2016)
11/08/2026, 16:12 Isle of Palms, SC Code of Ordinances
about:blank 3/3
MOBILITY STUDY 2026
IOP 2026 Mobility Study was developed by the Berkeley-Charleston-Dorchester Council of Governments (BCDCOG)
2026 MOBILITY STUDY
2
CITY OF ISLE OF PALMS
08/17/26
INTRODUCTION
The City of Isle of Palms (IOP) is a barrier island community located less than ten miles from
Charleston Harbor along South Carolina’s coast. The City’s nearly five miles of public beachfront
is among its most valuable assets, attracting thousands of visitors each year and serving as the
cornerstone to the local economy, residents’ quality of life, and the community’s coastal identity.
BACKGROUND
Mobility – the ability of people to move throughout and access different parts of a community – is
essential for coastal communities, like IOP, that experience a significant influx of daily visitors. As
tourism and the subsequent traffic volume continue to grow each year, the demand for additional,
safer alternative connections across the island also increases. The City recognizes that improving
and expanding its current infrastructure to meet the rising demand is key for enhancing mobility and
maintaining a network accessible to both residents and visitors of all ages and abilities.
PURPOSE
The purpose of this Mobility Study is to provide the city with the guidance and resources needed to
inform them on future decision making related to improving safety, accessibility, and connectivity
around the island. A safe, well-connected network of streets, sidewalks, bike facilities, and off-road
paths can provide greater mobility for people to access jobs, schools, shops, dining, parks, beaches,
community centers, and other public spaces. These connections are vital for the ongoing social,
economic, and physical health and success of the community.
The main components of this study will be to:
1. Assess the existing conditions of IOP’s current infrastructure
2. Identify any gaps in the network to/from popular destinations
3. Gather public input needs
4. Identify projects based on a needs assessment
5. Provide the City with a set of prioritized projects and recommendations to be implemented in
the future as funding becomes available
3
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
DEVELOPING THE STUDY
The Mobility Study was developed between
Spring 2025 and Summer 2026 with close
coordination between IOP residents, community
organizations and committees, Planning
Commission, City Staff, and the BCDCOG. It
incorporates priorities, goals, themes, and
ideas from other City plans, including its
Comprehensive Plan, Strategic Plan, and
Community Enrichment Plan.
The planning process consisted of three
main steps: Data Collection & Analysis, Needs
Assessment, and Project Recommendations.
The two primary data collection methods
used were: a field survey to document existing
conditions and public engagement to better
understand community priorities and needs.
The results of both the field survey and public
engagement were used as the foundation for
the Needs Assessment. This resulted in a list of
identified projects which were then scored and
prioritized based on their anticipated impact,
feasibility, and alignment with community
needs.
Other information, such as demographics,
public health statistics, crash history, and
walk and bike counts were also gathered
from various sources as part of the existing
condition analysis and used to inform the Needs
Assessment.
PROJECT TIMELINE
Ñ APRIL 2025
i Project Kick Off
Ñ JUNE-JULY 2025
i Field Survey
Ñ SEPTEMBER-OCTOBER 2025
i Online Public Survey
i In-Person Public Open House
Ñ NOVEMBER 2025-FEBRUARY 2026
i Existing Condition Analysis
Ñ MARCH-MAY 2026
i Needs Assessment
i Project Identification
Ñ JUNE-JULY 2026
i Project Scoring
i Selection of Recommended Projects
i Cost Estimates of Recommended
Projects
Ñ AUGUST 2026
i Final Adoption
The IOP 20026 Mobility Study was commissioned by the City of Isle of Palms using funding from Explore Charleston and the
Accommodations Tax (A-Tax).
2026 MOBILITY STUDY
4
CITY OF ISLE OF PALMS
08/17/26
SIDEWALK FIELD SURVEY
A field survey was conducted
during Summer 2025 and was
essential to accurately evaluate
and catalog the existing
conditions of IOP’s current
sidewalk network. This involved
several in-person site visits
and walkthroughs, providing
firsthand observations of sidewalk
conditions throughout the city.
The field survey focused on the
city’s publicly accessible sidewalk
infrastructure. Facilities within the
gates of the Wild Dunes resort
area were not considered within
this study. A summary table of the
sidewalk inventory is included as
Appendix A.
AT-GRADE SIDEWALK WITH
TRUNCATED DOMES
DELINEATED CROSSWALK WITH
PEDESTRIAN CROSSING SIGN
MOBILE FIELD SURVEY APP
For the site visits, an online mobile field survey
application was developed to evaluate and
catalog sidewalk conditions in real time using a
smartphone or tablet. Each sidewalk segment
was mapped as an individual GIS feature with
a customized attribute form to record key
sidewalk characteristics, including surface type
and condition, pavement width, pavement
elevation, safety and ADA infrastructure, and
the presence of impediments or obstructions to
walkability.
Photo attachments created a visual record of
issues, including sand, sediments, and debris
covering the pavement, overgrown vegetation,
pavement damage, standing water, and other
safety concerns.
A complete assessment of the city’s sidewalk inventory from the mobile GIS
app and be viewed using the QR Code or by going to: https://arcg.is/TCe5b1
Once in the app, select any sidewalk segment and click the table icon to view
all of the collected data, including the photographs.
5
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
PUBLIC ENGAGEMENT
Public engagement was a key step in identifying the needs and priorities of the community. There
were two public engagement opportunities offered throughout the planning process - an online
survey and an open house event. Results from both methods of public engagement provide an
assessment of the city’s network based more on firsthand knowledge and personal experiences
compared to the more analytical assessment from the field survey.
0
10
20
30
40
50
60
9/16 9/19 9/22 9/25 9/28 10/1 10/4 10/7 10/10 10/13 10/16 10/19 10/22 10/25 10/28 10/31
# of Daily Responses
Peak Participant Volume with
56 Responses on Oct. 14th
In-person Open House
was held on Oct. 20th
PUBLIC SURVEY RESPONSE VOLUME
PUBLIC SURVEY
The online public survey was live from
September 16th to October 31st, a total of 45
days. During that period, there were about 13,700
total responses and nearly 500 comments
collected from the 463 total participants.
The survey was organized into six topics -
Residency, Transportation Modes, Destinations,
Safety, Projects, and Support Level - guiding
participants through a logical flow and strategic
thought process to encourage more focused
and reflective responses.
Paper copies of the survey were available at City
Hall upon request.
463
TOTAL ONLINE SURVEY
PARTICIPANTS
13,724 TOTAL RESPONSES & 477 COMMENTS
WHO PARTICIPATED
2026 MOBILITY STUDY
6
CITY OF ISLE OF PALMS
08/17/26
0
30
60
90
120
Under 2 2 to 5 6 to 10 11 to 20 Over 20
Never
Rarely
Occasionally
Often
Always
TRANSPORTATION MODES
: Q How often do you take short trips on
the island using the following modes of
transportation?
As expected, most participants prefer to drive when
taking short trips around the island, with nearly three-
quarters responding “Often” or “Always.”
Despite the limited inventory of sidewalk and bike
infrastructure, 60% of participants reported frequently
walking, and 37% reported frequently biking.
Although not every household has access to a golf
cart or LSV, those that do likely use them just as
frequently as cars for those short trips on the island.
RESIDENCY
: Q What is your relationship with the City of Isle
of Palms?
: Q Are you a full-time or part-time resident?
: Q How long have you lived on Isle of Palms?
Of the 463 participants, a vast majority had a direct
relationship with IOP - being either an IOP resident,
business owner, and/or property owner.
Nearly all residents who participated in the survey
lived on the island full-time (98%), with just over half
reporting that they had been a resident for over ten
years.
IOP Resident
Not Resident but Interested
Business Owner
Property Owner (Not Primary
Residence)
Frequent IOP Visitor
were IOP
Residents
63%
REASONS FOR WALKING OR BIKING
: Q Please select your most common reasons for walking or biking.
Identifying common reason(s) for walking or
biking around the island revealed potential
behavioral patterns of residents.
Roughly 9 out of 10 participants chose “Leisure/
Health/Exercise” as one of their most common
reasons for walking or biking while three-fourths
chose “Going to the Beach.”
“Walking Pets” was a common write in answer.
Most reasons for walking or biking are
associated with a specified destination, such
as going to the beach, shopping/dining, and
commuting to work, while some, like for leisure,
health, or exercise and walking pets are not
necessarily.
0 80 160 240 320
Other
Accessing Beach
Reach Bus Stop
Commuting to Work
Going to Religious Services
Accessing Public Services
Visiting Friends/Family
Shopping/Dining
Going to Beach
Health/Leisure/Exercise
Note: Data for
Scooters and
E-Bikes is not
shown but can
be found in
Appendix A.
YEARS OF
RESIDENCY
7
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
DESTINATIONS
: Q How often do you walk and/or
bike to these points of interest
on IOP?
: Q Please select the IOP points
of interest that should be
prioritized for future connectivity
improvements.
Walking and/or biking is by far the most
common way that participants travel
to the beach on IOP. With the numerous
beach access points across the island,
accessibility to the beach is greater
than most other popular destinations
on the island which are usually limited
to a specific area.
In addition, participants were asked to
select the points of interest that should
be prioritized for future connectivity
improvements. The Beach Access
Points and IOP Connector Intersection
and Shopping Centers were both
selected by nearly two-thirds of
participants.
With about 40% of participants
indicating that they either never or
rarely walk and/or bike to the IOP
Connector, expanded infrastructure
in that area would greatly improve
the mobility and connectivity of that
important destination and help address
the needs expressed by residents.
0% 20% 40% 60% 80% 100%
Beach Access
Front Beach
Rec Center
Church
Services
Connector
Inlet
Marina
Never Rarely Occasionally Often Always
0 40 80 120 160 200 240 280
Places of Worship
Other
Public Services
Breach Inlet
Rec Center & Park
Marina
Front Beach
IOP Connector
Beach Access
PROJECTS
: Q Please select which of the
following improvements would
most likely influence your
decision to walk and/or bike
around the island.
When asked which of the following
improvements would most likely
influence a respondent’s decision to
walk and/or bike around the island, the
top responses were focused primarily
on physical aspects of IOP’s network –
improving and expanding infrastructure
– rather than enhancing the quality
and experience.
0 50 100 150 200 250
Improved Wayfinding & Signage
Other
More Shade from Trees
& Protection from Weather
Improved Lighting & Security
Bike Parking/Bike Facilities
Traffic Calming
Additional Pedestrian Amenities
Improved Crosswalks/Intersections
Protected Bike Lanes
New, Extended and/or
Widened Sidewalks
2026 MOBILITY STUDY
8
CITY OF ISLE OF PALMS
08/17/26
SURVEY MAP Q2: UNSAFE INTERSECTIONS
In addition to identifying unsafe streets, participants
were also asked to identify any intersections - including
crosswalks - that they felt unsafe at when walking and/
or biking. Points were again concentrated along Palm
Boulevard.
Point Placed (62 Total)
Nearly 1 in 5 participants
reported feeling unsafe at
the IOP Connector-Palm
Boulevard intersection.
SURVEY MAP Q1: UNSAFE STREETS
Participants were asked to identify any specific
walking and/or biking routes/streets that they felt
unsafe on. Palm and Waterway Boulevards received
the majority of comments.
Point Placed (58 Total)
Line Drawn
SURVEY MAP Q3: NEEDED INFRASTRUCTURE
Bike Lane (51 Total)
New Sidewalk (43 Total)
Crosswalk (29 Total)
Sidewalk Widening (15 Total)
Benches, Bike Rack, Shade Trees (10 Total)
Lighting (7 Total)
When asked where respondents think
improvements are needed, most of the points
identified were concentrated along streets with
existing sidewalk and/or bike infrastructure.
9
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
MOBILITY GOALS
: Q Please indicate your level of agreement with each of the following connectivity goals for the City
of Isle of Palms:
The following goals have been identified throughout the years and across several plans. An overwhelming
majority of survey participants “Agreed” with each of the statements.
EXPAND SAFE PEDESTRIAN & BICYCLE ACCESS ISLAND-WIDE
77% Agreed 18% were Unsure 5% Disagreed
IMPROVE TRAFFIC FLOW, ESPECIALLY DURING HIGH-TRAFFIC DAYS
78% Agreed 18% were Unsure 4% Disagreed
REDUCE VEHICLE & PEDESTRIAN CRASHES & INJURIES
77% Agreed 22% were Unsure 1% Disagreed
ENCOURAGE ALTERNATIVES TO PRIVATE CAR USE
71% Agreed 19% were Unsure 9% Disagreed
EXPAND INCLUSIVE INFRASTRUCTURE DESIGNS FOR ALL AGES, HOUSEHOLDS, & ABILITIES
64% Agreed 29% were Unsure 7% Disagreed
PLAN FOR FUTURE GROWTH, CLIMATE RISKS, & INFRASTRUCTURE OWNERSHIP
78% Agreed 14% were Unsure 8% Disagreed
FALL OPEN HOUSE
The Fall open house was held
on October 20th from 5:30pm
to 7:30pm at the IOP Rec Center.
Approximately 20 people
attended the event.
There were several interactive
stations including one that asked
attendees to map the routes that
they take to the beach, for their
daily walk or run, to walk their
pet, etc, and another that asked
about the needed micromobility
improvements throughout the
island.
2026 MOBILITY STUDY
10
CITY OF ISLE OF PALMS
08/17/26
COMMUNITY PROFILE
For decades, IOP has slowly been transitioning from being a primarily residential, commuter
community to a popular vacation and retirement destination. As a result, the demographic
composition of the city has also changed over time - consisting of more retirees and empty nesters
as opposed to working adults and young families. This shift requires the city to not only adapt to the
changing needs of its residents but also to its changing role in the region.
With the island approaching build out, IOP’s population has remained relatively steady since 2000,
fluctuating between 4,000 and 4,800 residents. In 2023, IOP’s resident population was estimated
at 4,350 people. However, during the peak summer months, the island witnesses as high as 25,000
additional daily trips from visitors and vacationers, essentially quadrupling the number of people on
the island. This was a key factor in the city’s recent IOP Thrives! Community Enrichment Plan and will
be taken into consideration during the Needs Assessment of this study.
698 998 1378
696
871
686
1592 979
1167
720 751 418
877
603 701
45.1 51.5 54.2
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
2000 2010 2023
Total Population
Chart Title
+97%
increase in Older Adults (65+) since 2000,
despite the total population decreasing by
about 5%
Under 18
18 to 34
35 to 54
55 to 64
65 & Over
AGE
Age shapes how communities move -
influencing social connections, daily routines,
mobility choices, and safety needs. People of
different ages often rely on different mobility
infrastructure to meet their needs. IOP’s
increasing median age is likely due to the city’s
ongoing popularity as a retirement destination
as well as current residents aging-in-place.
54 YEARS
IOP 2023
MEDIAN AGE
Compared to...
39 years in Charleston County,
38 years in the BCD Region, and
40 years in South Carolina.
Data Source: US Decennial Census and American
Community Survey (ACS) 5-Year Estimates
11
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
29%
40% 43%
67%
100%
40%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
STRL No STRL
HOUSING & SHORT
TERM RENTALS
A 2023 analysis of dwelling units
and short term rental licenses
(STRL) revealed that of the 4,610
total dwelling units in IOP, an
estimated 40% had a STRL. These
units are major contributors to
the islands growing seasonal
visitation numbers and the
increased demand for additional
safer and more accessible
connections islandwide.
Single
Family Townhouse
Duplex/
Triplex Condo
Commercial
Condo
Total
Dwelling
Units
Data Source: Analysis of Short-Term
Rentals per Type of Dwelling
https://www.iop.net/sites/default/files/
uploads/STRs/str_analysis_10.31.2023.pdf
CENSUS TRACT 49.01 CENSUS TRACT 49.02
• 10.2% had a mobility disability
• 14.7% were physically inactive
• 10.7% experienced frequent mental
distress
• 3.2% lacked reliable transportation
of the past 12 months
• 10.3% had a mobility disability
• 13.9% were physically inactive
• 9.6% experienced frequent mental
distress
• 2.7% lacked reliable transportation of
the past 12 months
HEALTH CONDITIONS
& DISABILITIES
The health conditions and
disability status of residents can
influence the transportation
and infrastructure needs of a
community.
In 2023, an estimated 11% of IOP
residents reported having a
disability.
Data Source: CDC PLACES
Note: Percentages are of Adults
aged 18 years and older
BUSINESSES &
EMPLOYEES
In 2026, there were an estimated
195 businesses located in IOP
that employed 2,165 people.
Retail Trade, Real Estate, Rental, &
Leasing, and Accommodations &
Food Services industries account
for a significant portion of
businesses and employees.
TOP INDUSTRIES
BUSINESSES EMPLOYEES
NUMBER PERCENT NUMBER PERCENT
Retail Trade 27 13.8% 253 11.7%
Real Estate, Rental, & Leasing 34 17.4% 363 16.8%
Accommodations 11 5.6% 685 31.6%
Food Services 24 12.3% 272 12.6%
All Other Industries 99 50.8% 592 27.3%
Data Source: Esri’s Business Analyst, Business Summary Report
2026 MOBILITY STUDY
12
CITY OF ISLE OF PALMS
08/17/26
Outflow
Commuters
Inflow
Commuters
180
Internal
Commuters
1,499 1,288
Data Source: US Census OntheMap Tool 2022
COMMUTING TRENDS
Multi-vehicle households continue to be the
norm in IOP. High levels of household vehicle
availability are closely tied to taking private
vehicles to work, reflecting residents’ continued
preference for driving alone as their primary
travel mode.
Encouraging residents to use alternative modes
of transportation, such as walking, biking, golf
carts/LSVs, etc. for short trips on the island will
help reduce the demand for on- and off-street
parking. This can have major impacts on traffic
patterns and needs islandwide - particularly
during the summer months, in the Front Beach
area, and at the beach accesses.
D
r
ive
Alone
62.5%
26.5%
0.6%
0.5%
7.6%
1.4%
Carpool
Walk
Bike
Work from
Home
Public
Transit
+15 Points
in commuters Working from Home since
2019, a common trend since the COVID-19
pandemic which prompted a nationwide
shift towards remote working
HOUSEHOLD VEHICLE AVAILABILITY
65%
of households had
access to at least 2
vehicles
Only about 2% of
households had no
access to a vehicle
in 2023, most of
which were within the
gates of Wild Dunes
development.
IN 2010,
13%
of commuters either
walked, biked, or rode
public transit to work
that percentage
has decreased to
<3% IN 2023
COMMUTER MODES OF
TRANSPORTATION
No Vehicle
1 Vehicle
2 Vehicles
3+ Vehicles
COMMUTER FLOW
IOP’s retail, restaurant and hospitality industries draw
daily commuters from across the region for work.
In 2022, IOP had more inflow commuters than
outflow commuters which reflects the city’s
ongoing transformation from a bedroom
community to a regional tourism and
hospitality destination.
The high percentage
of residents that work
from home affects
the number of outflow
commuters as they
don’t commute into
work.
13
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
ACTIVITY GENERATORS & HUBS
Activity generators are places that consistently attract people for a specific reason or purpose, such
as to work, shop, dine, learn, exercise, worship, or gather. IOP features numerous activity generators
- including beach access points, restaurants, shops, lodging, entertainment venues, recreation
facilities, and community services - that collectively establish the city as a destination in and of itself.
While many of these places serve both residents and visitors, some primarily cater to one group
over the other. For example, city services, places of worship, and recreation facilities are generally
resident-oriented, while lodging and entertainment venues primarily serve visitors.
The location, type, and concentration of activity generators influence how people a the
transportation network, where they travel, how often they travel, and whether they choose to walk,
bike, drive, or use other modes of transportation. Identifying these places provides valuable insight
into existing and future travel demand, as well as the infrastructure needed to safely and efficiently
connect people to the places they want to go.
Five areas across the island were identified as having high concentrations of activity generators:
• Front Beach commercial area
• Island “Entrance” shopping centers
• IOP Recreation Center & Park
• “Palm Boulevard beach access” area
• IOP Marina
These activity “hubs” generate a significant share of trips throughout the island, making safe and
accessible multi-modal connections to and between them essential. Evaluating how well the
transportation system - particularly the city’s micromobility infrastructure - serves these places
helps identify opportunities to improve safety, accessibility, connectivity, and overall mobility.
2026 MOBILITY STUDY
14
CITY OF ISLE OF PALMS
08/17/26
Isle of Palms County Park IOP Public Safety Building
Pavilions Shoppes at Front BeachWindjammer Bar & Event Venue
Front Beach includes a wide
range of land uses that cater
primarily to visitors, tourists,
and vacationers, but are
utilized by residents as well.
Most of the island’s higher
intensity development, including
restaurants, hotels, and retail
shops are located within this
area and routinely generate
high volumes of foot traffic
during peak seasons.
Ocean Boulevard is a prime
example of what successful
Complete Street policies
could look like. This corridor
was designed to encourage
walkability by having wide and
accessible sidewalks, frequent
and safe pedestrian crossings,
limited storefront parking, and
different pedestrian and cyclist
amenities including beaches,
shade trees, murals/public art,
bike racks, and planters.
FRONT BEACH
97
ACTIVITY GENERATORS WERE IDENTIFIED
ACROSS THE ISLAND, INCLUDING:
• Dozens of Businesses
• 40+ Beach Access Points
• Places of Worship
• Beach Reach Shuttle Stop
• Dewees Island Ferry Terminal
• Recreation Center & Park
• Isle of Palms County Park
• IOP Marina
• City Hall
• Public Safety Building
15
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
Ocean Park Plaza Shopping CenterIsland Center Shopping Center
Characterized by its vehicle-
oriented development, the
IOP Island Entrance is mostly
comprised of shopping centers
that feature different businesses
that provide essential daily
services for IOP residents and
visitors, like restaurants, banks,
salons, offices, and stores.
These destinations are primarily
supported by the vehicular
through traffic along the IOP
Connector and Palm Boulevard.
ISLAND ENTRANCE
Beach Access Points
Commercial
Government
Lodging
Medical
Parking/Transportation
Public Services
Recreation
Religious
2026 MOBILITY STUDY
16
CITY OF ISLE OF PALMS
08/17/26
EXISTING CONDITIONS
IOP’s transportation system is comprised of a multi-modal network of streets, sidewalks, bike
facilities, multi-use paths, and off-road paths. The interconnectedness of the infrastructure is crucial
for the city as residents and visitors rely on these connections for their daily needs, to travel between
destinations, and to access employment, education, and other essential services.
Assessing the existing conditions of the transportation infrastructure is a key element of this
study which formed the foundation for the strategies and recommendations outlined later in the
Implementation section.
ROADWAY NETWORK
IOP’s roadway network shapes the city’s transportation system, enabling both IOP residents and
visitors to move throughout and access different parts of the community. With driving being the
primary mode of travel for most people, it has become a critical component in the city’s overall
mobility and accessibility. The existing network supports the year-round traffic demand generated
mostly by residents with the seasonal traffic brought on by visitors.
The island is connected to the mainland and Town of Mount Pleasant via SC 517 - more commonly
known as the IOP Connector - and to the neighboring Town of Sullivan’s Island via SC 703 (Palm
Boulevard). Palm Boulevard is the main roadway that connects different parts of the community,
including Breach Inlet, Front Beach, and the Wild Dunes resort area.
OWNERSHIP & MAINTENANCE
Street and right-of-way ownership and maintenance is a common challenge for municipalities as
oftentimes the ownership influences the ability to improve infrastructure in a timely manner. Different
government agencies typically have different funding sources, schedules, and priorities which can
impact the consistency of improvements and maintenance.
TRANSIT ROUTES
The Beach Reach Shuttle is a seasonal shuttle service
operated by CARTA and is the only public transit route
that travels to IOP. It operates on weekends and select
holidays from Memorial Day to Labor Day. These
additional visitors further add to the volume of people
that IOP attracts during the summer months.
Shuttle riders are typically heavily reliant on the local
pedestrian infrastructure to travel between destinations.
The shuttle stop is at the Isle of Palms County Park and
connects to Mt Pleasant’s Town Center/Market Center
Boulevard.
17
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
STREET OWNERSHIP & MAINTENANCE
Most streets are owned and maintained by the state,
including key routes like Palm Boulevard, Waterway
Boulevard, and the IOP Connector. Most of the private
streets are within the Wild Dunes resort area.
Federal
State
County
Private
Public
ROADWAY NETWORK & PARKING LOCATIONS
A majority of streets are local roads that serve
the predominantly residential areas of the island
and are typically characterized by having high
(vehicular) accessibility, but low (vehicular) mobility.
Streets
On-Street Parking
Right of Way Parking
Municipal Parking Lot
PARKING FACILITIES
There are numerous dedicated parking facilities located across the island. They include:
• Municipal Parking Lots on Pavilion Drive
• Front Beach On-Street Parking
• Public Road Right-of-Ways
• 3rd Avenue between Ocean Boulevard and Charleston
Boulevard
• East side of 4th Avenue between Ocean Boulevard and
Charleston Boulevard
• 5th Avenue, between Ocean Boulevard and Carolina
Boulevard
• 6th Avenue, between Ocean Boulevard and Carolina
Boulevard
• 7th Avenue, between Ocean Boulevard and Carolina
Boulevard
• East side of 8th Avenue, between Ocean Boulevard and
Carolina Boulevard
• East side of 9th Avenue, between Ocean Boulevard and
Carolina Boulevard
• Palm Boulevard between 21st Avenue and 40th Avenue
• Palm Boulevard between 42nd Avenue and 53rd Avenue
2026 MOBILITY STUDY
18
CITY OF ISLE OF PALMS
08/17/26
ACTIVE TRANSPORTATION
Active modes of transportation - including human-powered forms of travel such as walking
and biking - are essential for coastal communities to provide alternative ways for both residents
and visitors to move throughout and access different parts of the community. This is particularly
important during the summer months to help alleviate the seasonal traffic congestion and reduce
the strain on parking facilities.
In addition, commercial areas, like Front Beach, heavily rely on high volumes of foot traffic. This
makes pedestrian safety infrastructure, easily accessible storefronts, and overall walkability crucial
for supporting the local island’s economy.
SIDEWALK INFRASTRUCTURE
Sidewalks are a crucial part of IOP’s overall
transportation network, providing pedestrians,
cyclists, and other non-motorists with dedicated
public space and safe travel routes. However,
not all streets require sidewalks. Lower density
areas, like most of IOP’s residential areas, often
lack the consistent volume and safety concerns
needed to warrant the infrastructure investment.
This is in contrast with the Front Beach area
which experiences higher and more consistent
foot traffic volumes - particularly during the
summer months. Most of the streets in Front
Beach have sidewalks on at least one side which
supports the areas commercial businesses.
There are currently approximately 8 miles
of sidewalk infrastructure across the island
(excluding the Wild Dunes area). This includes
traditional elevated sidewalks, at-grade
sidewalks, and at-grade paved shoulders.
A complete inventory of the sidewalks is
included as Appendix A of the report.
8
Miles of Sidewalks
along 7.5 Miles of Streets
63%
37%
were Concrete Pavement Material
were Asphalt Pavement Material
12%
Exceed the Standard Width
Most of which are in the Front Beach Area
5% 62% 33%
were
identified
as in Poor
condition
were
identified
as in Ok
condition
were
identified
as in Good
condition
86% Standard 4-5 Ft Width
2% Under the Standard Width
19
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
SIDEWALK CONDITIONS & IMPEDIMENTS
Most of IOP’s sidewalks were assessed as being
in “OK” or “Adequate” condition. Areas with higher
pedestrian traffic, like Front Beach, typically had
better quality sidewalks than other areas across
the island.
Overgrown
Vegetation Sand or Dirt Debris Bumps or
Cracks
Pieces
Missing Potholes Standing
Water
Uneven
Pavement
Some of the impediments or obstructions observed included:
The most common impediment found across the island was sand and/or dirt covering the sidewalk. While
small amounts are expected, there were several instances where the sand was fairly deep, creating an
obstacle particularly for those with wheels, such as bikes, scooters, strollers, wagons, etc.
A B C D E F G H
A
B
C D E F
G H
Good Condition
Ok Condition
Poor Condition
SIDEWALK INVENTORY
Of the approximately 29 miles of streets in IOP
(excluding those in Wild Dunes), only about 7.5 miles
of streets have dedicated sidewalk infrastructure on
at least one side with Palm, Ocean, and Waterway
Boulevards accounting for a bulk of the city’s inventory.
Sidewalk on One Side
Sidewalk on Both Sides
2026 MOBILITY STUDY
20
CITY OF ISLE OF PALMS
08/17/26
EAST COAST GREENWAY BATTERY 2 BEACH
The East Coast Greenway (ECG) is a
continuously evolving national multi-use trail
system that extends from Maine to the Florida
Keys. Currently over 2,600 miles in total length,
it comprises of on-road and off-road trails,
footpaths, sidewalks, bike lanes, etc.
The IOP Connector and Palm Boulevard are
segments of the current ECG route as it passes
through IOP.
Battery 2 Beach (B2B) is an approximately
32-mile long regional multi-use path system
created by local advocacy group, Charleston
Moves. It connects the Battery in downtown
Charleston to three Charleston-area beaches
- Folly Beach, Sullivan’s Island, and Isle of
Palms - passing through five municipalities.
The B2B route on IOP is mostly on Palm,
Ocean, and Waterway Boulevards with small
segments on Charleston Boulevard and on
3rd, 10th, 14th, and 21st Avenues.
BIKE FACILITIES
Bike facilities, like sharrows and dedicated bike lanes, are a major component of IOP’s overall
transportation system. Although most of the existing bike facilities are currently limited to Palm
Boulevard and the IOP Connector, cyclists in other parts of the island utilize the roadway and
sidewalks alongside pedestrians and motor vehicles.
In 2026, three bike repair stations were
installed at the Public Safety Building in Front
Beach, Recreation Center, and the Isle of
Palms Fire Station 2 near the Marina. These
stations were donated to the city by the Law
Enforcement Neighborhood Support (LENS)
Foundation of Isle of Palms.
REGIONAL NETWORKS
There are two major multi-use systems that travel through IOP: the East Coast Greenway and Battery
2 Beach.
21
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
Battery 2 Beach
East Coast Greenway
To Mount Pleasant
To Sullivan’s Island
EAST COAST GREENWAY
Nearly 2 MILES of the ECG runs
through IOP
BATTERY 2 BEACH
About 5.5 MILES of the B2B runs
through IOP
2026 MOBILITY STUDY
22
CITY OF ISLE OF PALMS
08/17/26
NETWORK USAGE
IOP draws thousands of visitors each day who rely on the local network to move through and access
different parts of the island. Understanding who uses the network, how they use it, and for what
purpose is essential for developing a system safe and accessible for all users. This analysis can
provide insight on current and future demand, helping the city identify priority areas and potential
infrastructure needs across the island.
37,000
Total Daily
Trips
12,300
Total Daily
Trip Takers
TAKEN BY RESIDENTS OF IOP 12,300 33%
TAKEN BY RESIDENTS OF BCD REGION* 27,600 75%
RESIDENTS OF IOP 3,600 29%
RESIDENTS OF BCD REGION* 9,700 79%
In Fall 2025, there were an estimated 37,000
total daily trips that either originated, ended,
or passed through IOP’s transportation system.
These trips were made by nearly 12,300 trip
takers. This includes everyday trips taken by IOP
residents and locals going the beach as well as
tourists and vacationers visiting the island and
commercial deliveries to businesses.
A majority of trips on the island were taken by
residents of the BCD Region. An estimated 29%
of the total Trip Takers were local IOP residents
while another 50% were residents of the BCD
Region. IOP Trip Takers accounted for roughly
one-third of all trips taken on the island.
* Includes IOP Residents
TRANSPORTATION MODE OF
TRIPS
Over half (55%) of all trips were
private vehicles with another
29% being Auto Passengers. The
breakdown of trips by driving
(Private Auto) shows that only
about 12% of trips were generated
by Regional Visitors - that most
trips are from IOP Residents and
daily visits by BCD Residents.
Trips by Walking and Biking were
much more evenly distributed by
IOP Residents, BCD Residents, and
Regional Visitors.
Other Modes of Transportation, including On-Demand and Public Transit,
accounted for less than 1% of trips.
Data Source: Replica Network Link
Volumes, Fall 2025
- 6,000 12,000 18,000 24,000
Private Auto
Passenger
Biking
Walking
Commercial
Total IOP Residents
Total IOP Residents BCD Residents Regional Visitors
23
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
0
2000
4000
6000
8000
10000
12000
14000
< 1 1 - 2 2 - 5 5 - 10 10 - 20 > 20
Miles
Total
IOP Residents
0
2000
4000
6000
8000
10000
12000
14000
16000
< 10 10 - 19 20 - 29 30 - 44 45 - 59 > 60
Minutes
Total
IOP Residents
TRIP PURPOSE
Traveling home is the most
frequent trip purpose as residents
and visitors ultimately return
home following their other daily
activities. In addition, going
home is not limited to certain
age groups as opposed to work
and school which is geared more
towards working aged adults and
kids respectively.
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Home Shop Work Eat
Social
Recreation
LodgingErrands
Commercial
SchoolOther
Departure
Total
IOP Residents
TRIP DISTANCE
Visitors accounted for a
significant share of medium
and long distance trips. This
is expected as IOP’s beaches
attract people from across the
region and beyond.
TRIP DURATION
About two-thirds of trips taken
by IOP residents were under 20
minutes.
Data Source: Replica Network Link
Volumes, Fall 2025
Data Source: Replica Network Link
Volumes, Fall 2025
Data Source: Replica Network Link
Volumes, Fall 2025
2026 MOBILITY STUDY
24
CITY OF ISLE OF PALMS
08/17/26
WALK COUNTS
< 500
501 - 1000
1001 - 2000
2000 - 3000
> 3000
Some of the highest walk counts outside of the Wild
Dunes area were along Palm and Ocean Boulevards
- likely a result of people parking along the streets
and walking to the beach.
Data Source: Strava 2024 Annual Walk Counts
BIKE COUNTS
< 1000
1001 - 2500
2501 - 5000
5001 - 10000
> 10000
Palm Boulevard between Breach Inlet and the IOP
Connector had among the highest bike counts.
Most other streets with comparable counts, such
as Ocean and Waterway Boulevards, were part of
either the ECG or B2B.
Data Source: Strava 2024 Annual Bike Counts
TOTAL TRIPS BY STREET SEGMENTS
< 500 Trips
501 - 1000 Trips
1001 - 2500 Trips
2501 - 5000 Trips
5000 - 10000 Trips
> 10000 Trips
The IOP Connector experiences the highest daily trip
volume likely due to it being the primary ingress and
egress route onto the island. Palm Boulevard also
experiences high daily trip volumes as it is the main
corridor for beach goers.
Data Source: Replica Network Link Volumes, Fall 2025
25
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
This page was intentionally left blank.
2026 MOBILITY STUDY
26
CITY OF ISLE OF PALMS
08/17/26
SAFETY CONDITIONS
Developing a transportation network with a strong sense of safety for both motorists and non-
motorists is crucial for cultivating a more connected and mobile future. IOP’s function as a beach
community adds to this challenge as the city experiences significant influxes of visitors who are
often unfamiliar with local traffic patterns, routes, and key intersections and/or crossings. This makes
safety improvements, such as crosswalks, pedestrian yield signs or signals, and ADA infrastructure,
particularly important to reduce the risk of crashes and ensure safety for all people.
SAFETY IMPROVEMENTS
Most sidewalks on the island have some form of safety
improvement. Although safety improvements are
needed island wide, a particular focus should be on
areas with high foot traffic volume, such as Front Beach
and sections of Palm Boulevard.
Vegetated
Buffer
Unvegetated
Wide Buffer
Elevated
Sidewalks
Truncated
Domes
Parked Cars
Buffer Curb Cuts Unvegetated
Thin Buffer
Delineated
Crosswalks
The different types of safety infrastructure around the island included:
A B C D E F G H
A
B
C
E H
G
D
F
Good Condition
Ok Condition
Poor Condition
27
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
CROSSWALKS &
INTERSECTIONS
Most of the marked crosswalks
are in the Front Beach area and
along Palm Boulevard. There are
two types of crosswalks most
commonly used on the island:
the standard crosswalk with
simply two parallel lines and
the delineated crosswalk which
looks like it is made of different
materials such as brick.
SIDEWALK-STREET CROSSING LOCATIONS
Sidewalks
Marked Crossing
Unmarked Crossing
Although there are a few marked crossings along
Palm Boulevard, most of the side street crossings
remained unmarked.
2026 MOBILITY STUDY
28
CITY OF ISLE OF PALMS
08/17/26
RECENT VEHICULAR CRASHES
All Crashes (335 Total)
Crash Involving Pedestrian (6 Total)
Crash Involving Cyclist (4 Total)
Over half (52%) of all crashes reported between 2019
and 2024 were along Palm Boulevard. This includes
8 of the 10 crashes that involved either a pedestrian
or cyclist.
RECENT CRASH
HISTORY
Crash history can provide insight
into the safety conditions of the
community as well as reveal any
high risk areas. Between 2019 and
2024, there were 335 total crashes
reported on the island. This is
equivalent to about one crash
every 5.5 days.
The frequency of crashes was
expectedly higher during the
summer months when the island
experiences an influx of visitors.
There were 10 total reported
crashes that involved non-
motorists: six pedestrians and four
cyclists. The reported probable
cause of the crash for four of the
ten crashes were driver distraction
with another three being failure to
yield the right of way.
Data Source: SCDOT Crash Reports, 2019-
2024
0
10
20
30
40
50
60
70
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
TOTAL CRASHES BY MONTH
335
TOTAL CRASHES REPORTED
BETWEEN 2019 AND 2024
57
CRASHES
IN 2019
63
CRASHES
IN 2020
57
CRASHES
IN 2021
56
CRASHES
IN 2022
64
CRASHES
IN 2023
38
CRASHES
IN 2024
Number of crashes peak
during the Summer months
29
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
No Injury
Possible Injury
Minor Injury
Serious Injury
Fatal
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
Distracted Impaired Speeding Wet Road
Surface
Nighttime Weather
Conditions
% of Total Crashes
0 25 50 75 100 125
Non-Collision
Other
Head On
Sideswipe (Opposite Direction)
Sideswipe (Same Direction)
Backed Into
Angle
Read End
Collision Type
COLLISION TYPE
Most crashes typically involve
some sort of collision. The type
of collision can provide insight
into larger safety concerns.
Rear End collisions (36% of all
crashes) and Angle collisions (19%
of all crashes) are commonly
attributed to speeding, high traffic
congested areas, and unsafe
intersections.
MAXIMUM INJURY SUSTAINED
A majority of all crashes between
2019 and 2024 resulted in no
injury. Only one reported crash
over the six-year period resulted
in a fatality. This incident was
one of the six crashes involving a
pedestrian.
CONTRIBUTING FACTORS
There are numerous contributing factors that can influence the likelihood of a crash, some self-
inflicting like driving impaired and speeding while others are more environmental, like weather
conditions and time of day. Overall, approximately two-thirds of all crashes involved one or more of
the contributing factors listed below.
2026 MOBILITY STUDY
30
CITY OF ISLE OF PALMS
08/17/26
NEEDS ASSESSMENT
The needs assessment was a critical step in the planning process, shaping the direction of all
subsequent steps, including the identification of recommended projects and the development of the
project scoring criteria. A running list of needs was continuously maintained throughout the planning
process and includes those identified during the field survey and public engagement process. Some
of the reoccurring topics that emerged from the needs assessment include improving accessibility,
comfort, safety, connectivity, resiliency, traffic mitigation, maintenance, and multi-modal options
across the island.
A list of over 60 projects and other needed improvements were initially identified and later
consolidated into 56 recommended projects. They are centered around improving and expanding
infrastructure to better connect destinations, improve safety, and encourage walkability. These
projects were categorized into six Project Types based on the type of improvement. Maps illustrating
the locations of the recommended projects by project type are provided on the following pages.
10 BIKE FACILITIES 9 NEW SIDEWALKS
19 CROSSWALKS & INTERSECTIONS 3 PLANNING
8 SIDEWALK IMPROVEMENTS 7 OTHER PROJECTS
A matrix of the identified projects was created and continuously updated throughout the remainder
of the planning process. It outlines project details such as project type, segment endpoints
(location), and project origin - whether identified from the field survey, public engagement, or both.
The matrix was vetted with IOP City Staff prior to the project scoring and prioritization process to
ensure the viability of the projects and whether they align with the city’s mobility goals. The final
recommended project matrix was summarized and included as Appendix B.
Projects or needed improvements that were consolidated may have included those that the city identified as not necessary
or redundant, overlapping projects, similar projects but at various locations, and projects that may already be underway.
PROJECT SCORING
The project scoring criteria was developed to provide a technical score to the identified projects
based on several key factors related to mobility, including accessibility, safety, connectivity, universal
design/conditions, and project feasibility as well as other considerations. Most of the metrics used
for the project scoring originated from the Data Collection & Analysis step of the planning process.
This includes results from public engagement and most of the data and information outlined in the
Existing Condition section - particularly the evaluations and observations from the field survey.
31
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
PROJECT SCORING CRITERIA
KEY FACTORS MAX SCORE METRIC DATA SCORING
Accessibility 5 Proximity & Access to
Activity Generators
Points of Interest/
Activity Generators Within Quarter Mile (5); Partially (3); No (0)
Safety 15
Crash Clusters SCDOT Crash History Cluster (5); Multiple-but spread out along
corridor (3); Single (1); None (0)
Unsafe Street Segments Public Survey Results > 5 Comments (5); 3-5 Comments (3); 1-2
Comments (1); None (0)
Unsafe Intersections Public Survey Results > 5 Comments (5); 3-5 Comments (3); 1-2
Comments (1); None (0)
Connectivity 16
Gaps in Network Identified Gaps from
Field Survey Yes (5); No (0)
Volume
Annual Walk Counts > 2000 (3); 1000-2000 (1); < 1000 (0)
Annual Bike Counts > 5000 (3); 2500-5000 (1); > 2500 (0)
Needed Infrastructure Public Survey Results > 5 Comments (5); 3-5 Comments (3); 1-2
Comments (1); None (0)
Universal
Design/
Condition
15
ADA Accessible Sidewalk Inventory Not Accessible (3); Accessible (0)
Sidewalk Width Sidewalk Inventory Narrow (3); Adequate Width (0)
Pavement Condition Sidewalk Inventory Poor (3); Ok (1); Good (0)
Maintenance/
Impediments
Observations from
Field Survey Multiple (3); Yes (1); None (0)
Evidence of/Susceptible
to Flooding
Observations from
Field Survey Yes (3); No (0)
Project
Feasibility 8
Cost Estimates < $1M (5); > $1M (0)
Requires Acquisition of
Right of Way County Parcel Data No (3); Yes (0)
Other
Considerations 9
Overlapping Projects Yes (3); No (0)
Mentioned in Previous
Plans
Yes-Project Specifically Mentioned (3);
Yes-General Project Idea Mentioned (1);
Not Mentioned (0)
Part of Regional Network Regional Bike Routes Yes (3); No (0)
Priorities 10 Planning Commission
Priority Identified by PC (10); Not Identified (0)
Max Total Score 78
Not all projects were assigned a score for each metric. For example, the metrics under Universal
Design/Conditions are based on field survey results assessing existing sidewalk infrastructure and,
therefore, are not applicable to projects involving new sidewalk infrastructure.
A preliminary project score consisting only of the analytical scoring that relied on the data,
information, and results collected throughout the planning process was presented to IOP’s Planning
Commission in Summer 2026. They were tasked with identifying priorities for the future which was
included as an additional consideration in the scoring criteria.
2026 MOBILITY STUDY
32
CITY OF ISLE OF PALMS
08/17/26
A5
A3
A7
A4
A10A8
A1
A9
A2
A6
BIKE FACILITIES
MAP
LABEL
RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT
SCORE
A1 Restripe existing Bike Lane markings along Palm Blvd Breach Inlet IOP Connector 56
A2 Add a Bike Lane along Ocean Blvd, Charleston Blvd and
14th Ave to follow B2B Route
Ocean Blvd Dead
End IOP Connector 35
A3 Add a Bike Lane along JC Long Blvd Ocean Blvd Palm Blvd 25
A4 Extend dedicated Bike Lane along Palm Blvd 10th Ave IOP Connector 45
A5 Extend Bike Lane along both sides of IOP Connector to
fully connect with Palm and front beach End of Bridge Palm Blvd 53
A6 Add a Bike Lane along Palm Blvd heading north IOP Connector 41st Ave 53
A7 Add Bike Infrastructure along 21st Ave Palm Blvd Waterway Blvd 29
A8 Add a Bike Lane along Hartnett Blvd 22nd Ave 41st Ave 22
A9 Add a Bike Lane along Waterway Blvd 21st Ave 41st Ave 51
A10 Add a Bike Lane along 41st Ave Palm Blvd Marina 38
33
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
B2B1
B12
B14
B6 B7
B17B12 B13
B11
B3
B4 B16B10B9
B8B5
B10 B15
CROSSWALKS & INTERSECTIONS
MAP
LABEL
RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT
SCORE
B1 Mark Crosswalks to Beach Access Points along Ocean
Blvd Beach Access 1B Beach Access 9 25
B2 Improve Markings and potentially add pedestrian
Signage/Signals along Ocean Blvd in Front Beach 10th Ave 14th Ave 27
B3 New Crosswalk at JC Long Blvd and Palm Blvd
Intersection Point at Intersection 34
B4 New Crosswalk near Public Safety Building along JC Long
Blvd Point at Crosswalk 20
B5 New Crosswalk near City Hall along Palm Blvd Point at Crosswalk 30
B6 IOP Connector Crosswalk & Intersection overall
Improvement Point at Intersection 53
B7 New Crossing with Signage/Signals at Palm Blvd and
20th Avenue Point at Intersection 42
B8 Improve Crosswalk Safety and Visibility at 21st Ave and
Palm Blvd Intersection Point at Intersection 42
B9 Improve Crosswalk Safety potentially with new signage/
signals along Palm Blvd at Beachside Ave Point at Intersection 21
B10 Improve markings and potentially add pedestrian
Signage/Signals at 25th Ave and Palm intersection Point at Intersection 25
B11 New Crosswalk at Waterway Blvd and 28th Ave Point at Intersection 23
B12 New Crosswalks at 29th Ave and both Palm Blvd and
Waterway Blvd Intersections Point at Intersections 25
B13 New Crosswalk with Signage/Signals at 41st Ave Beach
Access Point at Crosswalk 19
B14 Intersection Improvement at Palm Blvd and 41st Ave Point at Intersection 27
B15 Improve Crosswalk at Waterway Blvd and 41st Ave Point at Intersection 27
B16 Improve Crosswalk Markings at Palm Blvd and 43rd Ave
Intersection Point at Intersection 26
B17 Improve Crosswalks at Palm Blvd and Wild Dunes
Entrance Gate (46th) Point at Intersection 26
N/A Consistent Crosswalk Markings across all Side Streets Various Locations (Not Mapped) 25
2026 MOBILITY STUDY
34
CITY OF ISLE OF PALMS
08/17/26
C2
C1
C5
C6
C4
C3
SIDEWALK IMPROVEMENTS
MAP
LABEL
RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT
SCORE
C1 Widen Sidewalk along Ocean Blvd & 14th Ave in Front
Beach Commercial Area 10th Ave IOP Connector 28
C2 Widen Sidewalk along 21st Street Palm Blvd Waterway Blvd 22
C3 Improve Sidewalk along all of Waterway Blvd 21st Ave 41st Ave 43
C4 Widen Sidewalk along Palm Blvd 21st Ave 41st Ave 52
C5 Improve shoulder with a sidewalk along 41st Ave Palm Blvd Marina 27
C6 Widen Sidewalk along Palm Blvd 41st Ave 57th Ave 26
N/A Continuous Maintenance, Removal or Enforcement of
Obstructions Islandwide (Not Mapped) 12
N/A Repair Cracked, Damaged, Eroded, or Uneven Sidewalk
Segments Islandwide (Not Mapped) 12
35
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
D3
D4 D5
D7
D9
D2
D8
D1 D6 D6 D6 D6 D6 D6
NEW SIDEWALKS
MAP
LABEL
RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT
SCORE
D1 Extend Sidewalk along Palm Blvd Carolina Blvd 10th Ave 37
D2 Extend Sidewalk along Ocean Blvd Beach Access 1B Beach Access 6 27
D3 Sidewalk Extension along JC Long Blvd to Ocean Blvd End of Sidewalk Ocean Blvd 29
D4 New and Extend Sidewalk along IOP Connector End of Bridge Palm Blvd 48
D5 New Sidewalk/Multi-Use Path that connects Hartnett Blvd
to 21st Ave 21st Ave 22nd Ave 14
D6 Connect Crosswalks to Existing Sidewalk Infrastructure
along Palm Blvd Various Locations 39
D7 New Sidewalk along 28th Ave from Waterway to back of
Recreation Center Rec Center Waterway Blvd 26
D8 New Sidewalks around the Recreation Center Block Various Segments 13
D9 New Sidewalk along 34th Ave to connect Palm with
Forest Trail Palm Blvd Forest Trail 20
2026 MOBILITY STUDY
36
CITY OF ISLE OF PALMS
08/17/26
E3
E1 E2
PLANNING
MAP
LABEL
RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT
SCORE
E1 Conduct a Road Diet Study along Palm Boulevard
between Breach Inlet and the Connector Breach Inlet IOP Connector Not Scored
E2 Evaluate feasibility of adding a bus pull off at pedestrian
entrance to County Park Point at Transit Stop Not Scored
E3 Evaluate Feasibility of New Multi-Use Path in ROW
connecting 13th Ave to 20th Ave (along Cassina Ave) 13th Ave 20th Ave Not Scored
37
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
F3
F4
F2
F1
F2
F7
F1
F5 F5 F5 F5F5
F1
F1 F1
F2
F2
F2
F6 F6
OTHER PROJECTS
MAP
LABEL
RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT
SCORE
F1 Add Bike/Ped Amenities or Golf Cart Parking at Major
Destination Points Various Locations 19
F2 Add Street Lights along streets or at certain intersections
and/or crosswalks Various Locations 18
F3 Pave Off-Road Path parallel to Palm Blvd sidewalk
connecting to Bunch Park Cassina Ave 20th Ave 16
F4 Pave Off-Road Path/goat path adjacent to parking
along southside of Palm Blvd at 21st Ave curve 21st Ave curve 21st Ave 19
F5 Add Bike/Ped Amenities near Beach Access Points Various Locations 18
F6 Ensure beach access at 25th Ave and 34A are ADA
accessible/graded or mats Point at Intersections 32
F7 Sidewalk Drainage Project along Palm Blvd 36th Ave 41st Ave 24
2026 MOBILITY STUDY
38
CITY OF ISLE OF PALMS
08/17/26
PRIORITY PROJECT AREAS
There were five recommended priority project areas identified for the city to implement as funding
becomes available. These areas include most of the major roadways throughout IOP, including the
IOP Connector, Palm Boulevard, and Waterway Boulevard. Each priority area includes a list of Quick
Build Improvements and Enhanced Improvements along with cost estimates to help inform and
guide future decision-making.
ENHANCED IMPROVEMENTS: A list of recommended projects that would enhance the mobility,
safety, connectivity, and/or accessibility of the project area. This list is intended to encompass
projects that would typically require a higher level of planning and coordination to implement.
QUICK BUILD IMPROVEMENTS: A list of recommended projects that the city and partner agencies
can quickly implement to improve a more immediate safety, mobility, connectivity, and/or
accessibility need.
Note – Planning level cost estimates are based on a limited availability of project details and are developed using broad unit
cost assumptions derived from historical bids on similarly scoped micromobility projects in the BCD region. Actual project
costs may vary significantly based on future refinement of project scopes and advancement of projects to include detailed
engineering, traffic studies, survey, utility, right-of-way and adjusted construction costs based on future market conditions,
inflation, etc.
39
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
PROJECT AREA A
PALM BOULEVARD IMPROVEMENTS
(BREACH INLET TO IOP CONNECTOR)
ENHANCED IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
A1 Restripe existing bike
facilities along Palm Blvd Project Score: 56
D1 Extend sidewalk along Palm
Blvd Project Score: 37
Includes replacing existing bike lane symbols, sharrow
and chevron markings, numerous high visibility ladder
crosswalks, 5-ft concrete sidewalks, 8-ft wooden
boardwalks, and ADA access infrastructure
ESTIMATED PROJECT COSTS: $ 2,400,000
QUICK BUILD IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
A1 Restripe existing bike
facilities along Palm Blvd Project Score: 56
Includes replacing existing bike lane symbols, sharrow
and chevron markings, and numerous high visibility ladder
crosswalks
ESTIMATED PROJECT COSTS: $ 185,000
2026 MOBILITY STUDY
40
CITY OF ISLE OF PALMS
08/17/26
PROJECT AREA B
IOP CONNECTOR & INTERSECTION
ENHANCED IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
A5
Extend bike lanes along
both sides of IOP Connector
to connect with existing
facilities/infrastructure
Project Score: 53
B6
Improve crosswalks and
overall accessibility at IOP
Connector intersection
Project Score: 53
D4 Extend sidewalk along IOP
Connector to Palm Blvd Project Score: 48
Includes extending green bike lanes, numerous high
visibility ladder crosswalks, 5-ft concrete sidewalks, and
concrete pedestrian island(s)
ESTIMATED PROJECT COSTS: $ 650,000
QUICK BUILD IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
A5
Extend bike lanes along
both sides of IOP Connector
to connect with existing
facilities/infrastructure
Project Score: 53
B6
Improve crosswalks and
overall accessibility at IOP
Connector intersection
Project Score: 53
Includes extending green bike lanes and numerous high
visibility ladder crosswalks
ESTIMATED PROJECT COSTS: $ 65,000
41
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
PROJECT AREA C
INTERSECTION IMPROVEMENTS AT
PALM BOULEVARD “S-CURVE”
ENHANCED IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
B7
Improve crosswalk safety by
adding signage/signals at
Palm Blvd & 20th Ave
Project Score: 42
B8
Improve crosswalk safety
and visibility at Palm Blvd &
21st Ave intersection
Project Score: 42
Includes high visibility ladder crosswalks, white yield/
chevron markings, rectangular rapid flashing beacon
(RRFB), and signs & posts
ESTIMATED PROJECT COSTS: $ 90,000
QUICK BUILD IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
B7
Improve crosswalk safety by
adding signage/signals at
Palm Blvd & 20th Ave
Project Score: 42
B8
Improve crosswalk safety
and visibility at Palm Blvd &
21st Ave intersection
Project Score: 42
Includes high visibility ladder crosswalks, white yield/
chevron markings, and signs & posts
ESTIMATED PROJECT COSTS: $ 55,000
2026 MOBILITY STUDY
42
CITY OF ISLE OF PALMS
08/17/26
PROJECT AREA D
PALM BOULEVARD IMPROVEMENTS
(IOP CONNECTOR TO 41ST AVE)
ENHANCED IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
A6 Add bike facility along Palm
Blvd heading north Project Score: 53
C4
Widen sidewalk (or make
into a Multi-Use Path) along
Palm Blvd
Project Score: 52
D6
Connect crosswalks to
existing sidewalks along
Palm Blvd
Project Score: 39
Includes new sharrow & chevron markings and 5-ft
concrete sidewalks
ESTIMATED PROJECT COSTS: $ 1,300,000
QUICK BUILD IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
A6 Add bike facility along Palm
Blvd heading north Project Score: 53
D6
Connect crosswalks to
existing sidewalks along
Palm Blvd
Project Score: 39
Includes new sharrow & chevron markings and 5-ft
concrete sidewalks
ESTIMATED PROJECT COSTS: $100,000
43
2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
PROJECT AREA E
WATERWAY BOULEVARD
CONNECTIVITY IMPROVEMENTS
ENHANCED IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
A7 Add bike facility along 21st
Ave Project Score: 29
A9 Add bike facility along
Waterway Blvd Project Score: 51
A10 Add bike facility along 41st
Ave Project Score: 38
B11 New crosswalk across
Waterway Blvd at 28th Ave Project Score: 23
B15 Improve crosswalks at
Waterway Blvd and 41st Ave Project Score: 27
D7
New sidewalk along 28th
Ave from Waterway Blvd to
the IOP Recreation Center
Project Score: 26
Includes new sharrow & chevron markings, numerous
high visibility ladder crosswalks, 5-ft concrete sidewalks,
pedestrian ramps, and detectable warning materials
ESTIMATED PROJECT COSTS: $ 125,000
QUICK BUILD IMPROVEMENTS
BIKE FACILITIES CROSSWALKS &
INTERSECTIONS
SIDEWALK
IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS
B11 New crosswalk across
Waterway Blvd at 28th Ave Project Score: 23
B15 Improve crosswalks at
Waterway Blvd and 41st Ave Project Score: 27
D7
New sidewalk along 28th
Ave from Waterway Blvd to
the IOP Recreation Center
Project Score: 26
Includes numerous high visibility ladder crosswalks, 5-ft
concrete sidewalks, pedestrian ramps, and detectable
warning materials
ESTIMATED PROJECT COSTS: $ 105,000
08/17/26
2026 MOBILITY STUDY 44CITY OF ISLE OF PALMS
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
112 Palm Blvd Jasper Blvd Charleston Blvd Both Sides Discontinues at
One End
5 feet Yes Concrete Good (3) Concrete Curb
113 Palm Blvd Jasper Blvd Charleston Blvd Both Sides Both Ends 5 feet Yes Concrete Good (3) Concrete Curb
114 Palm Blvd Charleston Blvd Carolina Blvd One side Discontinues at
One End
6 feet Yes Concrete Good (3) Concrete Curb
115 Palm Blvd 9th Ave 10th Ave One side Transitions into
Paved Shoulder
5 feet Yes Concrete Ok (2) Concrete Curb Cracked or Raised
Surface; Overgrown
Landscaping/Vegetation
Changes to asphalt at end for
approximately 200 ft. Stops in front of
901
116 Palm Blvd Parking Lot 10th Ave Both Sides Discontinues
Before End
5 feet Yes Concrete Ok (2) Bike Lane
121 Palm Blvd 10th Ave Carolina Blvd Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Over Hanging Limbs Raised uneven surface, Cracks
122 Palm Blvd 10th Ave Carolina Blvd Both Sides Both Ends 5 feet Yes Concrete Ok (2) Bike Lane
123 Palm Blvd Carolina Blvd 12th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping Bike lane
120 Palm Blvd Carolina Blvd 12th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping Raise surfaces Hanging Limbs
119 Palm Blvd 12th Ave City Hall Both Sides Both Ends 5 feet Yes Concrete Ok (2) Cracked or Raised
Surface
124 Palm Blvd 12th Ave 14th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Bike lane
118 Palm Blvd City Hall 13th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping
117 Palm Blvd 13th Ave Parking Lot Both Sides Both Ends 10 feet Yes Concrete Good (3) Concrete Curb
125 Palm Blvd 14th Ave Ocean Park
Plaza Entrance
Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes only at
one end
Sand/Dirt Covering
Sidewalk
126 Palm Blvd Ocean Park
Plaza Entrance
Ocean Park
Plaza Entrance
Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Sand/Dirt Covering
Sidewalk
127 Palm Blvd Ocean Park
Plaza Entrance
21st Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Ends with no crosswalk
143 Palm Blvd Parking Lot IOP Connector Both Sides Both Ends 10 feet Yes Concrete Good (3) Concrete Curb
179 Palm Blvd IOP Connector IOP Connector
Turn Lane
Both Sides Both Ends 5 feet Yes Concrete Good (3) Curb Cut & Truncated
Domes
6 Palm Blvd IOP Connector
Turn Lane
Island Center
Entrance
Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes
5 Palm Blvd Island Center
Entrance
Island Center
Entrance
Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes
4 Palm Blvd Island Center
Entrance
Cassina Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes Overgrown Landscaping
3 Palm Blvd Cassina Ave 20th Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes
2 Palm Blvd 20th Ave 21st Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes
156 Palm Blvd 21st Ave Parking Lot Both Sides Both Ends 4.5 feet Yes Concrete Ok (2) Concrete Curb Truncated Domes only at
one end
Cracked or Raised
Surface
Raised above street level; Current
plan in place to extend and improve
sidewalk on 21st ave
155 Palm Blvd Parking Lot Palm Blvd One side Both Ends 4 feet No Asphalt Poor (1) Sand/Dirt Covering
Sidewalk
This segment of 21st abruptly stops
and turns into an asphalt shoulder.
Current plan in place to extend and
improve sidewalk on 21st ave
45 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
112 Palm Blvd Jasper Blvd Charleston Blvd Both Sides Discontinues at
One End
5 feet Yes Concrete Good (3) Concrete Curb
113 Palm Blvd Jasper Blvd Charleston Blvd Both Sides Both Ends 5 feet Yes Concrete Good (3) Concrete Curb
114 Palm Blvd Charleston Blvd Carolina Blvd One side Discontinues at
One End
6 feet Yes Concrete Good (3) Concrete Curb
115 Palm Blvd 9th Ave 10th Ave One side Transitions into
Paved Shoulder
5 feet Yes Concrete Ok (2) Concrete Curb Cracked or Raised
Surface; Overgrown
Landscaping/Vegetation
Changes to asphalt at end for
approximately 200 ft. Stops in front of
901
116 Palm Blvd Parking Lot 10th Ave Both Sides Discontinues
Before End
5 feet Yes Concrete Ok (2) Bike Lane
121 Palm Blvd 10th Ave Carolina Blvd Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Over Hanging Limbs Raised uneven surface, Cracks
122 Palm Blvd 10th Ave Carolina Blvd Both Sides Both Ends 5 feet Yes Concrete Ok (2) Bike Lane
123 Palm Blvd Carolina Blvd 12th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping Bike lane
120 Palm Blvd Carolina Blvd 12th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping Raise surfaces Hanging Limbs
119 Palm Blvd 12th Ave City Hall Both Sides Both Ends 5 feet Yes Concrete Ok (2) Cracked or Raised
Surface
124 Palm Blvd 12th Ave 14th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Bike lane
118 Palm Blvd City Hall 13th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping
117 Palm Blvd 13th Ave Parking Lot Both Sides Both Ends 10 feet Yes Concrete Good (3) Concrete Curb
125 Palm Blvd 14th Ave Ocean Park
Plaza Entrance
Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes only at
one end
Sand/Dirt Covering
Sidewalk
126 Palm Blvd Ocean Park
Plaza Entrance
Ocean Park
Plaza Entrance
Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Sand/Dirt Covering
Sidewalk
127 Palm Blvd Ocean Park
Plaza Entrance
21st Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Ends with no crosswalk
143 Palm Blvd Parking Lot IOP Connector Both Sides Both Ends 10 feet Yes Concrete Good (3) Concrete Curb
179 Palm Blvd IOP Connector IOP Connector
Turn Lane
Both Sides Both Ends 5 feet Yes Concrete Good (3) Curb Cut & Truncated
Domes
6 Palm Blvd IOP Connector
Turn Lane
Island Center
Entrance
Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes
5 Palm Blvd Island Center
Entrance
Island Center
Entrance
Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes
4 Palm Blvd Island Center
Entrance
Cassina Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes Overgrown Landscaping
3 Palm Blvd Cassina Ave 20th Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes
2 Palm Blvd 20th Ave 21st Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes
156 Palm Blvd 21st Ave Parking Lot Both Sides Both Ends 4.5 feet Yes Concrete Ok (2) Concrete Curb Truncated Domes only at
one end
Cracked or Raised
Surface
Raised above street level; Current
plan in place to extend and improve
sidewalk on 21st ave
155 Palm Blvd Parking Lot Palm Blvd One side Both Ends 4 feet No Asphalt Poor (1) Sand/Dirt Covering
Sidewalk
This segment of 21st abruptly stops
and turns into an asphalt shoulder.
Current plan in place to extend and
improve sidewalk on 21st ave
08/17/26
2026 MOBILITY STUDY 46CITY OF ISLE OF PALMS
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
157 Palm Blvd 21st Ave 22nd Ave One side Both Ends 4.4 feet No Concrete Ok (2) Grass Buffer Some evidence Sand/Dirt Covering
Sidewalk
Material changes from asphalt to
concrete. Golf cart path runs parallel
to sidewalk. Material changes to
asphalt
7 Palm Blvd 22nd Ave 23rd Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Overgrown Landscaping Material changes to sand on one end
8 Palm Blvd 23rd Ave 24th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Cracked or Raised
Surface
Materials switch between asphalt,
concrete, and concrete with pebbles
9 Palm Blvd 24th Ave 25th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes only at
one end
Sand/Dirt Covering
Sidewalk
10 Palm Blvd 25th Ave 26th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering
Sidewalk
11 Palm Blvd 26th Ave 27th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Sand/Dirt Covering
Sidewalk
The only portion of segment that
really made it a 2 was the part where
a home was under construction
and sand covered the sidewalk and
construction equipment also likely
damaged it
12 Palm Blvd 27th Ave 28th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Limited
evidence
at ends of
segment
Sand/Dirt Covering
Sidewalk
Very limited encroachment,
connection on one end connects to
two sidewalks
13 Palm Blvd 28th Ave 29th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering
Sidewalk
Limited encroachment from sand and
dirt, some sharp elevations- pebble
material on some surface helps with
ada requirement
14 Palm Blvd 29th Ave Palm Ct One side Discontinues
Before End
4.5 feet No Concrete Poor (1) Damaged
Grass Buffer
Truncated Domes Sand/Dirt Covering
Sidewalk
Additional impediments: overgrown
landscaping, cracked sidewalks, and a
segment of sidewalk made of sand
15 Palm Blvd Palm Ct 30th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering
Sidewalk
16 Palm Blvd 30th Ave 31st Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Some evidence
at crossing
Truncated Domes Sand/Dirt Covering
Sidewalk
Overgrown landscape too
17 Palm Blvd 31st Ave 32nd Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering
Sidewalk
Also cracked sidewalk
18 Palm Blvd 32nd Ave 33rd Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Sand/Dirt Covering
Sidewalk
Encroachment minor
19 Palm Blvd 33rd Ave 34th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Some evidence
at low points
Truncated Domes Sand/Dirt Covering
Sidewalk
Also Overgrown plants and some non
level sidewalk parts
20 Palm Blvd 34th Ave 35th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Small evidence
in specific
portion see
photos
Truncated Domes Sand/Dirt Covering
Sidewalk
21 Palm Blvd 35th Ave 36th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Truncated Domes One small case on encroachment
22 Palm Blvd 36th Ave 37th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Light evidence
of flooding
Truncated Domes Overgrown Landscaping
23 Palm Blvd 37th Ave 38th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Overgrown Landscaping
24 Palm Blvd 38th Ave 39th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Grass Buffer Near crossings Sand/Dirt Covering
Sidewalk
Condition can arguably be a 3
25 Palm Blvd 39th Ave 40th Ave One side Both Ends 4.2 feet No Concrete Ok (2) Grass Buffer Evident Sand/Dirt Covering
Sidewalk
47 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
157 Palm Blvd 21st Ave 22nd Ave One side Both Ends 4.4 feet No Concrete Ok (2) Grass Buffer Some evidence Sand/Dirt Covering
Sidewalk
Material changes from asphalt to
concrete. Golf cart path runs parallel
to sidewalk. Material changes to
asphalt
7 Palm Blvd 22nd Ave 23rd Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Overgrown Landscaping Material changes to sand on one end
8 Palm Blvd 23rd Ave 24th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Cracked or Raised
Surface
Materials switch between asphalt,
concrete, and concrete with pebbles
9 Palm Blvd 24th Ave 25th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes only at
one end
Sand/Dirt Covering
Sidewalk
10 Palm Blvd 25th Ave 26th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering
Sidewalk
11 Palm Blvd 26th Ave 27th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Sand/Dirt Covering
Sidewalk
The only portion of segment that
really made it a 2 was the part where
a home was under construction
and sand covered the sidewalk and
construction equipment also likely
damaged it
12 Palm Blvd 27th Ave 28th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Limited
evidence
at ends of
segment
Sand/Dirt Covering
Sidewalk
Very limited encroachment,
connection on one end connects to
two sidewalks
13 Palm Blvd 28th Ave 29th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering
Sidewalk
Limited encroachment from sand and
dirt, some sharp elevations- pebble
material on some surface helps with
ada requirement
14 Palm Blvd 29th Ave Palm Ct One side Discontinues
Before End
4.5 feet No Concrete Poor (1) Damaged
Grass Buffer
Truncated Domes Sand/Dirt Covering
Sidewalk
Additional impediments: overgrown
landscaping, cracked sidewalks, and a
segment of sidewalk made of sand
15 Palm Blvd Palm Ct 30th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering
Sidewalk
16 Palm Blvd 30th Ave 31st Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Some evidence
at crossing
Truncated Domes Sand/Dirt Covering
Sidewalk
Overgrown landscape too
17 Palm Blvd 31st Ave 32nd Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering
Sidewalk
Also cracked sidewalk
18 Palm Blvd 32nd Ave 33rd Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Sand/Dirt Covering
Sidewalk
Encroachment minor
19 Palm Blvd 33rd Ave 34th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Some evidence
at low points
Truncated Domes Sand/Dirt Covering
Sidewalk
Also Overgrown plants and some non
level sidewalk parts
20 Palm Blvd 34th Ave 35th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Small evidence
in specific
portion see
photos
Truncated Domes Sand/Dirt Covering
Sidewalk
21 Palm Blvd 35th Ave 36th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Truncated Domes One small case on encroachment
22 Palm Blvd 36th Ave 37th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Light evidence
of flooding
Truncated Domes Overgrown Landscaping
23 Palm Blvd 37th Ave 38th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Overgrown Landscaping
24 Palm Blvd 38th Ave 39th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Grass Buffer Near crossings Sand/Dirt Covering
Sidewalk
Condition can arguably be a 3
25 Palm Blvd 39th Ave 40th Ave One side Both Ends 4.2 feet No Concrete Ok (2) Grass Buffer Evident Sand/Dirt Covering
Sidewalk
08/17/26
2026 MOBILITY STUDY 48CITY OF ISLE OF PALMS
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
26 Palm Blvd 40th Ave 41st Ave One side Both Ends 4.2 feet No Concrete Ok (2) Grass Buffer Evident Overgrown Landscaping
27 Palm Blvd Beach Access
41
Palm Blvd Both Sides Discontinues at
One End
4.45 feet Yes Concrete Good (3) Concrete Curb No rumble strips,
crosswalk present
Cracked or Raised
Surface
Elevation changes on sidewalk
28 Palm Blvd Palm Blvd Cameron Blvd Both Sides Both Ends 5 feet No Concrete Ok (2) Grass Buffer Strips and marked
crossing
Cracked or Raised
Surface
Connects to Cameron blvd- some
encroachment as well
29 Palm Blvd 41st Ave 42nd Ave One side Both Ends 4 feet Yes Concrete,
Asphalt,
Sand (West
to East)
Poor (1) Damaged
Grass Buffer
Truncated Domes
30 Palm Blvd 42nd Ave 43rd Ave One Side Both Ends 5.3 feet No Asphalt Ok (2) Concrete Curb Truncated Domes
31 Palm Blvd 43rd Ave 44th Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Concrete Curb Truncated Domes
32 Palm Blvd 44th Ave 45th Ave One side Both Ends 5.3 feet No Asphalt Good (3) Grass Buffer Truncated Domes
33 Palm Blvd 45th Ave 46th Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
34 Palm Blvd 46th Ave 47th Ave One side Both Ends 4.75 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
35 Palm Blvd 47th Ave 48th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
36 Palm Blvd 48th Ave 49th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
37 Palm Blvd 49th Ave 50th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
144 Palm Blvd 50th Ave Driveway One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
145 Palm Blvd Driveway 51st Ave One side Both Ends 4.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
38 Palm Blvd 51st Ave 52nd Ave One side Both Ends 4.6 feet No Asphalt Ok (2) Grass Buffer Overgrown Landscaping
39 Palm Blvd 52nd Ave 53rd Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer
146 Palm Blvd 53rd Ave 54th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Rumble strip both ends Cracked or Raised
Surface
Crosswalk at 53rd Ave
147 Palm Blvd 54th Ave 55th Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Cracked or Raised
Surface
Crosswalk at Beach Access 54
40 Palm Blvd 55th Ave 56th Ave One side Both Ends 5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Over Hanging Limbs
41 Palm Blvd 56th Ave 57th Ave One side Both Ends 5 feet No Asphalt Good (3) Grass Buffer
182 IOP Connector Palm Blvd One Side Discontinues at
One End
6 Feet Yes Concrete Good (3) Concrete Curb Truncated Domes Extra Long/Wide Curb Cut and
Truncated Domes at end
128 Ocean Blvd 6th Ave 7th Ave One side Both Ends 5 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Some sand; Landscaping overgrowth;
Low points; Parking buffer; Small
surface cracks
129 Ocean Blvd 7th Ave 8th Ave One side Both Ends 5 feet No Concrete Ok (2) Parking Buffer Overgrown Landscaping Grass and parking buffer; Overgrowth
landscaping sloping of surface
130 Ocean Blvd 8th Ave 9th Ave One side Both Ends 5 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Sidewalks cracking or are uneven
131 Ocean Blvd 9th Ave 10th Ave One side Discontinues at
One End
5 feet No Concrete Good (3) Grass Buffer Over Hanging Limbs Splits at end into retail area
181 Ocean Blvd 10th Ave JC Long Blvd Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Sand/Dirt Covering
Sidewalk
132 Ocean Blvd JC Long Blvd Parking Lot Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Sand/Dirt Covering
Sidewalk
134 Ocean Blvd JC Long Blvd Pavilion Dr Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Truncated Domes only at
one end
49 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
26 Palm Blvd 40th Ave 41st Ave One side Both Ends 4.2 feet No Concrete Ok (2) Grass Buffer Evident Overgrown Landscaping
27 Palm Blvd Beach Access
41
Palm Blvd Both Sides Discontinues at
One End
4.45 feet Yes Concrete Good (3) Concrete Curb No rumble strips,
crosswalk present
Cracked or Raised
Surface
Elevation changes on sidewalk
28 Palm Blvd Palm Blvd Cameron Blvd Both Sides Both Ends 5 feet No Concrete Ok (2) Grass Buffer Strips and marked
crossing
Cracked or Raised
Surface
Connects to Cameron blvd- some
encroachment as well
29 Palm Blvd 41st Ave 42nd Ave One side Both Ends 4 feet Yes Concrete,
Asphalt,
Sand (West
to East)
Poor (1) Damaged
Grass Buffer
Truncated Domes
30 Palm Blvd 42nd Ave 43rd Ave One Side Both Ends 5.3 feet No Asphalt Ok (2) Concrete Curb Truncated Domes
31 Palm Blvd 43rd Ave 44th Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Concrete Curb Truncated Domes
32 Palm Blvd 44th Ave 45th Ave One side Both Ends 5.3 feet No Asphalt Good (3) Grass Buffer Truncated Domes
33 Palm Blvd 45th Ave 46th Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
34 Palm Blvd 46th Ave 47th Ave One side Both Ends 4.75 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
35 Palm Blvd 47th Ave 48th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
36 Palm Blvd 48th Ave 49th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
37 Palm Blvd 49th Ave 50th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
144 Palm Blvd 50th Ave Driveway One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
145 Palm Blvd Driveway 51st Ave One side Both Ends 4.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes
38 Palm Blvd 51st Ave 52nd Ave One side Both Ends 4.6 feet No Asphalt Ok (2) Grass Buffer Overgrown Landscaping
39 Palm Blvd 52nd Ave 53rd Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer
146 Palm Blvd 53rd Ave 54th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Rumble strip both ends Cracked or Raised
Surface
Crosswalk at 53rd Ave
147 Palm Blvd 54th Ave 55th Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Cracked or Raised
Surface
Crosswalk at Beach Access 54
40 Palm Blvd 55th Ave 56th Ave One side Both Ends 5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Over Hanging Limbs
41 Palm Blvd 56th Ave 57th Ave One side Both Ends 5 feet No Asphalt Good (3) Grass Buffer
182 IOP Connector Palm Blvd One Side Discontinues at
One End
6 Feet Yes Concrete Good (3) Concrete Curb Truncated Domes Extra Long/Wide Curb Cut and
Truncated Domes at end
128 Ocean Blvd 6th Ave 7th Ave One side Both Ends 5 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Some sand; Landscaping overgrowth;
Low points; Parking buffer; Small
surface cracks
129 Ocean Blvd 7th Ave 8th Ave One side Both Ends 5 feet No Concrete Ok (2) Parking Buffer Overgrown Landscaping Grass and parking buffer; Overgrowth
landscaping sloping of surface
130 Ocean Blvd 8th Ave 9th Ave One side Both Ends 5 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Sidewalks cracking or are uneven
131 Ocean Blvd 9th Ave 10th Ave One side Discontinues at
One End
5 feet No Concrete Good (3) Grass Buffer Over Hanging Limbs Splits at end into retail area
181 Ocean Blvd 10th Ave JC Long Blvd Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Sand/Dirt Covering
Sidewalk
132 Ocean Blvd JC Long Blvd Parking Lot Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Sand/Dirt Covering
Sidewalk
134 Ocean Blvd JC Long Blvd Pavilion Dr Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Truncated Domes only at
one end
08/17/26
2026 MOBILITY STUDY 50CITY OF ISLE OF PALMS
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
175 Ocean Blvd 10th Ave Beach Access
13
Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some puddling
180 Ocean Blvd JC Long Blvd Pavilion Dr Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some evident Limited strips Cracked or Raised
Surface
133 Ocean Blvd Pavilion Dr 14th Ave Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some evident Limited strips Cracked or Raised
Surface
135 Ocean Blvd Pavilion Dr 14th Ave Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer
139 JC Long Blvd Pavilion Dr Palm Blvd One side Discontinues at
One End
5 feet No Concrete Good (3) Damaged
Grass Buffer
174 JC Long Blvd Ocean Blvd Pavilion Dr One side Discontinues
Before End
8 feet No Concrete Good (3) Grass Buffer Some evidence
140 Pavilion Dr Ocean Blvd JC Long Blvd Both Sides Discontinues at
One End
8 feet No Concrete Good (3) Grass Buffer Overgrown Landscaping
141 Pavilion Dr Ocean Blvd JC Long Blvd Both Sides Discontinues at
One End
5 feet No Concrete Ok (2) Damaged
Grass Buffer
136 14th Ave Palm Blvd Maintenance
Building
Entrance
One side Both Ends 5 feet No Concrete Good (3) Grass Buffer
137 14th Ave Maintenance
Building
Entrance
County Park
Entrance
One side Both Ends 5 feet No Concrete Good (3) Damaged
Grass Buffer
138 14th Ave County Park
Entrance
Ocean Blvd One side Both Ends 5 feet Yes Concrete Good (3) Grass Buffer
173 21st Ave Palm Blvd Parking Lot Both Sides Both Ends 4.5 feet No Concrete Good (3) Concrete Curb Truncated Domes Current plan in place to extend and
improve sidewalk on 21st ave
106 21st Ave Parking Lot Waterway Blvd One side Both Ends 4 feet No Asphalt Ok (2) Grass Buffer Some evidence
in potholes
Relatively smooth- some
bumps
Sand/Dirt Covering
Sidewalk
Current plan in place to extend and
improve sidewalk on 21st ave
105 Waterway Blvd 21st Ave 22nd Ave One side Discontinues at
One End
3.5 feet No Asphalt Ok (2) Grass Buffer
104 Waterway Blvd 22nd Ave 25th Ave One side Both Ends 5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Cracked or Raised
Surface
Narrows and winds in places
103 Waterway Blvd 25th Ave Tabby Ln One side Both Ends 5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Overgrown Landscaping
102 Waterway Blvd Tabby Ln Driftwood Ln One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Overgrown Landscaping
101 Waterway Blvd Driftwood Ln Seahorse Ct One side Both Ends 5 feet No Asphalt Poor (1) Damaged
Grass Buffer
Cracked or Raised
Surface
100 Waterway Blvd Seahorse Ct Ensign Ct One side Both Ends 3.8 feet No Asphalt Poor (1) Damaged
Grass Buffer
Overgrown Landscaping Lots of debris and hanging limbs.
Cracks in surface
99 Waterway Blvd Ensign Ct 29th Ave One side Both Ends 5 feet No Asphalt Poor (1) Damaged
Grass Buffer
Overgrown Landscaping
166 Waterway Blvd 29th Ave 30th Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Cracked or Raised
Surface
Asphalt concrete mix. Lowpoints.
98 Waterway Blvd 30th Ave 31st Ave One side Both Ends 4 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Concrete asphalt mix raised unflat
surface. Hanging limbs. Separation
varies in width. Cracks in surface.
51 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
175 Ocean Blvd 10th Ave Beach Access
13
Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some puddling
180 Ocean Blvd JC Long Blvd Pavilion Dr Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some evident Limited strips Cracked or Raised
Surface
133 Ocean Blvd Pavilion Dr 14th Ave Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some evident Limited strips Cracked or Raised
Surface
135 Ocean Blvd Pavilion Dr 14th Ave Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer
139 JC Long Blvd Pavilion Dr Palm Blvd One side Discontinues at
One End
5 feet No Concrete Good (3) Damaged
Grass Buffer
174 JC Long Blvd Ocean Blvd Pavilion Dr One side Discontinues
Before End
8 feet No Concrete Good (3) Grass Buffer Some evidence
140 Pavilion Dr Ocean Blvd JC Long Blvd Both Sides Discontinues at
One End
8 feet No Concrete Good (3) Grass Buffer Overgrown Landscaping
141 Pavilion Dr Ocean Blvd JC Long Blvd Both Sides Discontinues at
One End
5 feet No Concrete Ok (2) Damaged
Grass Buffer
136 14th Ave Palm Blvd Maintenance
Building
Entrance
One side Both Ends 5 feet No Concrete Good (3) Grass Buffer
137 14th Ave Maintenance
Building
Entrance
County Park
Entrance
One side Both Ends 5 feet No Concrete Good (3) Damaged
Grass Buffer
138 14th Ave County Park
Entrance
Ocean Blvd One side Both Ends 5 feet Yes Concrete Good (3) Grass Buffer
173 21st Ave Palm Blvd Parking Lot Both Sides Both Ends 4.5 feet No Concrete Good (3) Concrete Curb Truncated Domes Current plan in place to extend and
improve sidewalk on 21st ave
106 21st Ave Parking Lot Waterway Blvd One side Both Ends 4 feet No Asphalt Ok (2) Grass Buffer Some evidence
in potholes
Relatively smooth- some
bumps
Sand/Dirt Covering
Sidewalk
Current plan in place to extend and
improve sidewalk on 21st ave
105 Waterway Blvd 21st Ave 22nd Ave One side Discontinues at
One End
3.5 feet No Asphalt Ok (2) Grass Buffer
104 Waterway Blvd 22nd Ave 25th Ave One side Both Ends 5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Cracked or Raised
Surface
Narrows and winds in places
103 Waterway Blvd 25th Ave Tabby Ln One side Both Ends 5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Overgrown Landscaping
102 Waterway Blvd Tabby Ln Driftwood Ln One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Overgrown Landscaping
101 Waterway Blvd Driftwood Ln Seahorse Ct One side Both Ends 5 feet No Asphalt Poor (1) Damaged
Grass Buffer
Cracked or Raised
Surface
100 Waterway Blvd Seahorse Ct Ensign Ct One side Both Ends 3.8 feet No Asphalt Poor (1) Damaged
Grass Buffer
Overgrown Landscaping Lots of debris and hanging limbs.
Cracks in surface
99 Waterway Blvd Ensign Ct 29th Ave One side Both Ends 5 feet No Asphalt Poor (1) Damaged
Grass Buffer
Overgrown Landscaping
166 Waterway Blvd 29th Ave 30th Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Cracked or Raised
Surface
Asphalt concrete mix. Lowpoints.
98 Waterway Blvd 30th Ave 31st Ave One side Both Ends 4 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Concrete asphalt mix raised unflat
surface. Hanging limbs. Separation
varies in width. Cracks in surface.
08/17/26
2026 MOBILITY STUDY 52CITY OF ISLE OF PALMS
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
165 Waterway Blvd 31st Ave 32nd Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Smooth- on the one end
of segment closest to
golf course, there are
many cracks
Overgrown Landscaping
164 Waterway Blvd 32nd Ave Shady Ln One side Both Ends 4.3 feet No Asphalt Ok (2) Grass Buffer No evidence-
maybe for
puddling
Smooth but too much
sand
Sand/Dirt Covering
Sidewalk
163 Waterway Blvd Shady Ln Oakview Ln One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Smooth surface Sand/Dirt Covering
Sidewalk
Impediments mainly sand or dirt-
could be a condition 3
162 Waterway Blvd Oakview Ln Timber Ln One side Both Ends 5.3 feet No Asphalt Poor (1) Damaged
Grass Buffer
Surface broken and
uneven
Sand/Dirt Covering
Sidewalk
Image where sidewalk covered by
sand is due to construction work
ongoing
161 Waterway Blvd Timber Ln Forest Trail One side Both Ends 4.5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Relatively smooth Sand/Dirt Covering
Sidewalk
See image of Palm Tree: this tree looks
like its about to fall onto the sidewalk
next hurricane
160 Waterway Blvd Forest Trail Driveway One side Both Ends 5.5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Smooth surface Sand/Dirt Covering
Sidewalk
Path narrows at south end
97 Waterway Blvd Driveway Duck Lane One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Smooth surface Sand/Dirt Covering
Sidewalk
Middle portion could be graded a 1 for
condition
159 Waterway Blvd Duck Ln Sparrow Dr One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Relatively smooth
surface
Sand/Dirt Covering
Sidewalk
Project Plan in place to raise Waterway
Blvd MultiUse path between 41st and
38th
158 Waterway Blvd Sparrow Dr Intracoastal Ct One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Rumble strips Cracked or Raised
Surface
Project Plan in place to raise Waterway
Blvd MultiUse path between 41st and
38th
96 Waterway Blvd Intercoastal Ct 41st Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Truncated Domes only at
one end
Sand/Dirt Covering
Sidewalk
Project Plan in place to raise Waterway
Blvd MultiUse path between 41st and
38th
107 28th Ave Palm Blvd Cameron Blvd One side Both Ends 5 feet No Concrete Good (3) Damaged
Grass Buffer
Rumble strips; slight
elevation; smooth
surface
108 28th Ave Cameron Blvd Hartnett Blvd One side Both Ends 5 feet No Concrete Good (3) Grass Buffer Smooth surface; rumble
strips; some elevation
but gradual
109 28th Ave Hartnett Blvd IOP Recreation
Center
Both Sides Discontinues at
One End
4.5 feet No Concrete Good (3) Parking Buffer Smooth surface; no
rumble strips
110 28th Ave Hartnett Blvd IOP Recreation
Center
Both Sides Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Smooth surface;
Truncated Domes only at
one end
178 41st Ave Marginal Rd Wildwood Dr One Side Both Ends 4 feet No Asphalt Ok (2) None - Paved
Shoulder
Evident Drainage Grates
176 41st Ave Wildwood Dr Frank Sottile Ln One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes but
very high incline
Overgrown Landscaping
171 41st Ave Frank Sottile
Lane
Driveway One side Both Ends 5.5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Truncated Domes
at intersection; very
steep incline - not ADA
approved slope
Cracked or Raised
Surface
170 41st Ave Driveway Parking Lot One side Both Ends 5 feet No Asphalt Poor (1) Damaged
Grass Buffer
No rumble extremely
uneven
Sand/Dirt Covering
Sidewalk
Sidewalk almost completely gone,
covered by sand and gravel
53 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
165 Waterway Blvd 31st Ave 32nd Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Smooth- on the one end
of segment closest to
golf course, there are
many cracks
Overgrown Landscaping
164 Waterway Blvd 32nd Ave Shady Ln One side Both Ends 4.3 feet No Asphalt Ok (2) Grass Buffer No evidence-
maybe for
puddling
Smooth but too much
sand
Sand/Dirt Covering
Sidewalk
163 Waterway Blvd Shady Ln Oakview Ln One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Smooth surface Sand/Dirt Covering
Sidewalk
Impediments mainly sand or dirt-
could be a condition 3
162 Waterway Blvd Oakview Ln Timber Ln One side Both Ends 5.3 feet No Asphalt Poor (1) Damaged
Grass Buffer
Surface broken and
uneven
Sand/Dirt Covering
Sidewalk
Image where sidewalk covered by
sand is due to construction work
ongoing
161 Waterway Blvd Timber Ln Forest Trail One side Both Ends 4.5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Relatively smooth Sand/Dirt Covering
Sidewalk
See image of Palm Tree: this tree looks
like its about to fall onto the sidewalk
next hurricane
160 Waterway Blvd Forest Trail Driveway One side Both Ends 5.5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Smooth surface Sand/Dirt Covering
Sidewalk
Path narrows at south end
97 Waterway Blvd Driveway Duck Lane One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Smooth surface Sand/Dirt Covering
Sidewalk
Middle portion could be graded a 1 for
condition
159 Waterway Blvd Duck Ln Sparrow Dr One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Relatively smooth
surface
Sand/Dirt Covering
Sidewalk
Project Plan in place to raise Waterway
Blvd MultiUse path between 41st and
38th
158 Waterway Blvd Sparrow Dr Intracoastal Ct One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Rumble strips Cracked or Raised
Surface
Project Plan in place to raise Waterway
Blvd MultiUse path between 41st and
38th
96 Waterway Blvd Intercoastal Ct 41st Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Truncated Domes only at
one end
Sand/Dirt Covering
Sidewalk
Project Plan in place to raise Waterway
Blvd MultiUse path between 41st and
38th
107 28th Ave Palm Blvd Cameron Blvd One side Both Ends 5 feet No Concrete Good (3) Damaged
Grass Buffer
Rumble strips; slight
elevation; smooth
surface
108 28th Ave Cameron Blvd Hartnett Blvd One side Both Ends 5 feet No Concrete Good (3) Grass Buffer Smooth surface; rumble
strips; some elevation
but gradual
109 28th Ave Hartnett Blvd IOP Recreation
Center
Both Sides Discontinues at
One End
4.5 feet No Concrete Good (3) Parking Buffer Smooth surface; no
rumble strips
110 28th Ave Hartnett Blvd IOP Recreation
Center
Both Sides Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Smooth surface;
Truncated Domes only at
one end
178 41st Ave Marginal Rd Wildwood Dr One Side Both Ends 4 feet No Asphalt Ok (2) None - Paved
Shoulder
Evident Drainage Grates
176 41st Ave Wildwood Dr Frank Sottile Ln One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes but
very high incline
Overgrown Landscaping
171 41st Ave Frank Sottile
Lane
Driveway One side Both Ends 5.5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Truncated Domes
at intersection; very
steep incline - not ADA
approved slope
Cracked or Raised
Surface
170 41st Ave Driveway Parking Lot One side Both Ends 5 feet No Asphalt Poor (1) Damaged
Grass Buffer
No rumble extremely
uneven
Sand/Dirt Covering
Sidewalk
Sidewalk almost completely gone,
covered by sand and gravel
08/17/26
2026 MOBILITY STUDY 54CITY OF ISLE OF PALMS
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
169 41st Ave Parking Lot Parking Lot One side Both Ends 5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Sand/Dirt Covering
Sidewalk
168 41st Ave Parking Lot Parking Lot One side Both Ends 6 feet No Asphalt Ok (2) Grass Buffer Sand/Dirt Covering
Sidewalk
167 41st Ave Parking Lot Fire Station One side Discontinues at
One End
4.8 feet No Concrete Ok (2) Damaged
Grass Buffer
Truncated Domes only at
one end
Sand/Dirt Covering
Sidewalk
172 Marina 41st Ave Marina One side Discontinues at
One End
4.9 feet Yes Concrete Ok (2) Parking Buffer Looks like a recently built sidewalk
55 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE
SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK
CONNECTION
WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF
FLOODING
ADA INFRASTRUCTURE IMPEDIMENTS NOTES
169 41st Ave Parking Lot Parking Lot One side Both Ends 5 feet No Asphalt Ok (2) Damaged
Grass Buffer
Sand/Dirt Covering
Sidewalk
168 41st Ave Parking Lot Parking Lot One side Both Ends 6 feet No Asphalt Ok (2) Grass Buffer Sand/Dirt Covering
Sidewalk
167 41st Ave Parking Lot Fire Station One side Discontinues at
One End
4.8 feet No Concrete Ok (2) Damaged
Grass Buffer
Truncated Domes only at
one end
Sand/Dirt Covering
Sidewalk
172 Marina 41st Ave Marina One side Discontinues at
One End
4.9 feet Yes Concrete Ok (2) Parking Buffer Looks like a recently built sidewalk
08/17/26
2026 MOBILITY STUDY 56CITY OF ISLE OF PALMS
APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING
TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD
ANALYSIS
PUBLIC
ENGAGEMENT
CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE
MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78
BIKE FACILITIES
A1 Restripe existing Bike Lane
markings along Palm Blvd
Breach Inlet IOP Connector X X 5 13 8 3 8 9 10 56
A2 Add Bike Facility along Ocean
Blvd, Charleston Blvd and 14th
Ave to follow B2B Route*
Ocean Blvd
Dead End
IOP Connector X Follows the B2B route
5 4 11 0 8 7 0 35
A3 Add Bike Facility along JC Long
Blvd
Ocean Blvd Palm Blvd X 5 5 3 0 8 4 0 25
A4 Extend dedicated Bike Lane
along Palm Blvd
10th Ave IOP Connector X 5 15 8 0 8 9 0 45
A5 Extend Bike Lane along both
sides of IOP Connector to fully
connect with Palm and front
beach
End of Bridge Palm Blvd X X Outbound connection is a
critical gap (TOP Priority for
the City) 5 10 11 0 8 9 10 53
A6 Add Bike Facility along Palm
Blvd heading north
IOP Connector 41st Ave X 5 15 11 0 8 4 10 53
A7 Add Bike Facility along 21st Ave Palm Blvd Waterway Blvd X X 5 5 7 0 8 4 0 29
A8 Add Bike Facility along Hartnett
Blvd
22nd Ave 41st Ave X ROW concerns 5 4 1 0 8 4 0 22
A9 Add Bike Facility along
Waterway Blvd
21st Ave 41st Ave X 8ft multi-use path under
construction along
Waterway
3 11 13 0 8 6 10 51
A10 Add Bike Facility along 41st Ave Palm Blvd Marina X 3 10 11 0 8 6 0 38
57 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING
TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD
ANALYSIS
PUBLIC
ENGAGEMENT
CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE
MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78
BIKE FACILITIES
A1 Restripe existing Bike Lane
markings along Palm Blvd
Breach Inlet IOP Connector X X 5 13 8 3 8 9 10 56
A2 Add Bike Facility along Ocean
Blvd, Charleston Blvd and 14th
Ave to follow B2B Route*
Ocean Blvd
Dead End
IOP Connector X Follows the B2B route
5 4 11 0 8 7 0 35
A3 Add Bike Facility along JC Long
Blvd
Ocean Blvd Palm Blvd X 5 5 3 0 8 4 0 25
A4 Extend dedicated Bike Lane
along Palm Blvd
10th Ave IOP Connector X 5 15 8 0 8 9 0 45
A5 Extend Bike Lane along both
sides of IOP Connector to fully
connect with Palm and front
beach
End of Bridge Palm Blvd X X Outbound connection is a
critical gap (TOP Priority for
the City) 5 10 11 0 8 9 10 53
A6 Add Bike Facility along Palm
Blvd heading north
IOP Connector 41st Ave X 5 15 11 0 8 4 10 53
A7 Add Bike Facility along 21st Ave Palm Blvd Waterway Blvd X X 5 5 7 0 8 4 0 29
A8 Add Bike Facility along Hartnett
Blvd
22nd Ave 41st Ave X ROW concerns 5 4 1 0 8 4 0 22
A9 Add Bike Facility along
Waterway Blvd
21st Ave 41st Ave X 8ft multi-use path under
construction along
Waterway
3 11 13 0 8 6 10 51
A10 Add Bike Facility along 41st Ave Palm Blvd Marina X 3 10 11 0 8 6 0 38
08/17/26
2026 MOBILITY STUDY 58CITY OF ISLE OF PALMS
APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING
TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD
ANALYSIS
PUBLIC
ENGAGEMENT
CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE
MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78
CROSSWALKS & INTERSECTIONS
B1 Mark Crosswalks to Beach
Access Points along Ocean Blvd
Beach Access
1b
Beach Access 9 X X 5 2 4 0 8 6 0 25
B2 Improve Markings and
potentially add pedestrian
Signage/Signals along Ocean
Blvd in Front Beach
10th Ave 14th Ave X X
5 7 0 0 8 7 0 27
B3 New Crosswalk at JC Long Blvd
and Palm Blvd Intersection Point at Intersection X X 5 11 6 0 8 4 0 34
B4 New Crosswalk near Public
Safety Building along JC Long
Blvd
Point at Crosswalk
X
5 2 1 0 8 4 0 20
B5 New Crosswalk near City Hall
along Palm Blvd Point at Crosswalk X 5 11 2 0 8 4 0 30
B6 IOP Connector Crosswalk
& Intersection overall
Improvement
Point at Intersection
X X
5 15 6 0 8 9 10 53
B7 New Crossing with Signage/
Signals at Palm Blvd and 20th
Avenue
Point at Intersection
X
5 13 2 0 8 4 10 42
B8 Improve Crosswalk Safety and
Visibility at 21st Ave and Palm
Blvd Intersection
Point at Intersection
X
5 13 2 0 8 4 10 42
B9 Improve Crosswalk Safety
potentially with new signage/
signals along Palm Blvd at
Beachside Ave
Point at Intersection
X
5 3 1 0 8 4 0 21
B10 Improve markings and
potentially add pedestrian
Signage/Signals at 25th Ave
and Palm intersection
Point at Intersection
X
3 6 4 0 8 4 0 25
B11 New Crosswalk at Waterway
Blvd and 28th Ave Point at Intersection X 5 0 4 0 8 6 0 23
B12 New Crosswalks at 29th Ave
and both Palm Blvd and
Waterway Blvd Intersections
Point at Intersections
X
5 2 4 0 8 6 0 25
B13 New Crosswalk with Signage/
Signals at 41st Ave Beach
Access
Point at Crosswalk
X May be too close to curve
for DOT to approve 5 1 1 0 8 4 0 19
B14 Intersection Improvement at
Palm Blvd and 41st Ave Point at Intersection X Project underway 5 7 1 0 8 6 0 27
B15 Improve Crosswalk at
Waterway Blvd and 41st Ave Point at Intersection X 5 7 1 0 8 6 0 27
B16 Improve Crosswalk Markings
at Palm Blvd and 43rd Ave
Intersection
Point at Intersection
X X Project is Complete
5 6 1 0 8 6 0 26
B17 Improve Crosswalks at Palm
Blvd and Wild Dunes Entrance
Gate (46th)
Point at Intersection
X Project is underway
5 6 1 0 8 6 0 26
N/A Consistent Crosswalk Markings
on all Side Streets Various Locations (Not Mapped) X 5 3 6 0 8 3 0 25
59 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING
TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD
ANALYSIS
PUBLIC
ENGAGEMENT
CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE
MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78
CROSSWALKS & INTERSECTIONS
B1 Mark Crosswalks to Beach
Access Points along Ocean Blvd
Beach Access
1b
Beach Access 9 X X 5 2 4 0 8 6 0 25
B2 Improve Markings and
potentially add pedestrian
Signage/Signals along Ocean
Blvd in Front Beach
10th Ave 14th Ave X X
5 7 0 0 8 7 0 27
B3 New Crosswalk at JC Long Blvd
and Palm Blvd Intersection Point at Intersection X X 5 11 6 0 8 4 0 34
B4 New Crosswalk near Public
Safety Building along JC Long
Blvd
Point at Crosswalk
X
5 2 1 0 8 4 0 20
B5 New Crosswalk near City Hall
along Palm Blvd Point at Crosswalk X 5 11 2 0 8 4 0 30
B6 IOP Connector Crosswalk
& Intersection overall
Improvement
Point at Intersection
X X
5 15 6 0 8 9 10 53
B7 New Crossing with Signage/
Signals at Palm Blvd and 20th
Avenue
Point at Intersection
X
5 13 2 0 8 4 10 42
B8 Improve Crosswalk Safety and
Visibility at 21st Ave and Palm
Blvd Intersection
Point at Intersection
X
5 13 2 0 8 4 10 42
B9 Improve Crosswalk Safety
potentially with new signage/
signals along Palm Blvd at
Beachside Ave
Point at Intersection
X
5 3 1 0 8 4 0 21
B10 Improve markings and
potentially add pedestrian
Signage/Signals at 25th Ave
and Palm intersection
Point at Intersection
X
3 6 4 0 8 4 0 25
B11 New Crosswalk at Waterway
Blvd and 28th Ave Point at Intersection X 5 0 4 0 8 6 0 23
B12 New Crosswalks at 29th Ave
and both Palm Blvd and
Waterway Blvd Intersections
Point at Intersections
X
5 2 4 0 8 6 0 25
B13 New Crosswalk with Signage/
Signals at 41st Ave Beach
Access
Point at Crosswalk
X May be too close to curve
for DOT to approve 5 1 1 0 8 4 0 19
B14 Intersection Improvement at
Palm Blvd and 41st Ave Point at Intersection X Project underway 5 7 1 0 8 6 0 27
B15 Improve Crosswalk at
Waterway Blvd and 41st Ave Point at Intersection X 5 7 1 0 8 6 0 27
B16 Improve Crosswalk Markings
at Palm Blvd and 43rd Ave
Intersection
Point at Intersection
X X Project is Complete
5 6 1 0 8 6 0 26
B17 Improve Crosswalks at Palm
Blvd and Wild Dunes Entrance
Gate (46th)
Point at Intersection
X Project is underway
5 6 1 0 8 6 0 26
N/A Consistent Crosswalk Markings
on all Side Streets Various Locations (Not Mapped) X 5 3 6 0 8 3 0 25
08/17/26
2026 MOBILITY STUDY 60CITY OF ISLE OF PALMS
APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING
TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD
ANALYSIS
PUBLIC
ENGAGEMENT
CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE
MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78
SIDEWALK IMPROVEMENTS
C1 Widen Sidewalk along Ocean
Blvd & 14th Ave in Front Beach
Commercial Area
10th Ave IOP Connector X X ROW constraints and
fitting as much parking as
practical
5 7 1 6 3 6 0 28
C2 Widen Sidewalk along 21st
Street
Palm Blvd Waterway Blvd X Sidewalk replaced/
extended to Palm at beach
access in 2025
5 1 0 7 3 6 0 22
C3 Improve Sidewalk along all of
Waterway Blvd
21st Ave 41st Ave X New 8ft multi-use path
under construction along
Waterway Blvd
3 13 6 12 3 6 0 43
C4 Widen Sidewalk along Palm Blvd 21st Ave 41st Ave X Working with DOT on
project improvement and
coordinating with TST;
Long-range idea
5 15 6 7 3 6 10 52
C5 Improve shoulder with a
sidewalk along 41st Ave
Palm Blvd Marina X X 3 7 1 10 3 3 0 27
C6 Widen Sidewalk along Palm Blvd 41st Ave 57th Ave X 5 7 4 1 3 6 0 26
N/A Continuous Maintenance,
Removal or Enforcement of
Obstructions
Islandwide (Not Mapped)
X X
0 0 0 3 3 6 0 12
N/A Repair Cracked, Damaged,
Eroded, or Uneven Sidewalk
Segments
Islandwide (Not Mapped)
X X
0 0 0 3 3 6 0 12
NEW SIDEWALKS
D1 Extend Sidewalk along Palm
Blvd
Carolina Blvd 10th Ave X X TST funding allocated/
engineering done to
extend sidewalk; Phase 1 is
from Carolina to 2nd Ave
5 13 7 0 3 9 0 37
D2 Extend Sidewalk along Ocean
Blvd
Beach Access
1b
Beach Access 6 X 5 4 9 0 3 6 0 27
D3 Sidewalk Extension along JC
Long Blvd to Ocean Blvd
End of Sidewalk Ocean Blvd X Approved TST funding to
extend sidewalk (at-grade
sidewalk)
5 5 5 0 8 6 0 29
D4 New and Extend Sidewalk along
IOP Connector
End of Bridge Palm Blvd X X 5 15 9 0 3 6 10 48
D5 New Sidewalk/Multi-Use Path
that connects Hartnett Blvd to
21st Ave
21st Ave 22nd Ave X Would need easement
between two private
properties/newer homes
5 0 0 0 5 4 0 14
D6 Connect Crosswalks to Existing
Sidewalk Infrastructure along
Palm
Various Locations X
5 6 11 6 8 3 0 39
D7 New Sidewalk along 28th Ave
from Waterway to back of
Recreation Center
Rec Center Waterway Blvd X X Recently finished 28th
along Palm, sidewalk to
Waterway would make
sense
5 1 6 0 8 6 0 26
D8 New Sidewalk around the
Recreation Center Block
Various Segments X 5 1 1 0 3 3 0 13
D9 New Sidewalk along 34th Ave to
connect Palm Blvd with Forest
Trail
Palm Blvd Forest Trail X Resident driven project
5 6 0 0 8 1 0 20
61 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING
TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD
ANALYSIS
PUBLIC
ENGAGEMENT
CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE
MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78
SIDEWALK IMPROVEMENTS
C1 Widen Sidewalk along Ocean
Blvd & 14th Ave in Front Beach
Commercial Area
10th Ave IOP Connector X X ROW constraints and
fitting as much parking as
practical
5 7 1 6 3 6 0 28
C2 Widen Sidewalk along 21st
Street
Palm Blvd Waterway Blvd X Sidewalk replaced/
extended to Palm at beach
access in 2025
5 1 0 7 3 6 0 22
C3 Improve Sidewalk along all of
Waterway Blvd
21st Ave 41st Ave X New 8ft multi-use path
under construction along
Waterway Blvd
3 13 6 12 3 6 0 43
C4 Widen Sidewalk along Palm Blvd 21st Ave 41st Ave X Working with DOT on
project improvement and
coordinating with TST;
Long-range idea
5 15 6 7 3 6 10 52
C5 Improve shoulder with a
sidewalk along 41st Ave
Palm Blvd Marina X X 3 7 1 10 3 3 0 27
C6 Widen Sidewalk along Palm Blvd 41st Ave 57th Ave X 5 7 4 1 3 6 0 26
N/A Continuous Maintenance,
Removal or Enforcement of
Obstructions
Islandwide (Not Mapped)
X X
0 0 0 3 3 6 0 12
N/A Repair Cracked, Damaged,
Eroded, or Uneven Sidewalk
Segments
Islandwide (Not Mapped)
X X
0 0 0 3 3 6 0 12
NEW SIDEWALKS
D1 Extend Sidewalk along Palm
Blvd
Carolina Blvd 10th Ave X X TST funding allocated/
engineering done to
extend sidewalk; Phase 1 is
from Carolina to 2nd Ave
5 13 7 0 3 9 0 37
D2 Extend Sidewalk along Ocean
Blvd
Beach Access
1b
Beach Access 6 X 5 4 9 0 3 6 0 27
D3 Sidewalk Extension along JC
Long Blvd to Ocean Blvd
End of Sidewalk Ocean Blvd X Approved TST funding to
extend sidewalk (at-grade
sidewalk)
5 5 5 0 8 6 0 29
D4 New and Extend Sidewalk along
IOP Connector
End of Bridge Palm Blvd X X 5 15 9 0 3 6 10 48
D5 New Sidewalk/Multi-Use Path
that connects Hartnett Blvd to
21st Ave
21st Ave 22nd Ave X Would need easement
between two private
properties/newer homes
5 0 0 0 5 4 0 14
D6 Connect Crosswalks to Existing
Sidewalk Infrastructure along
Palm
Various Locations X
5 6 11 6 8 3 0 39
D7 New Sidewalk along 28th Ave
from Waterway to back of
Recreation Center
Rec Center Waterway Blvd X X Recently finished 28th
along Palm, sidewalk to
Waterway would make
sense
5 1 6 0 8 6 0 26
D8 New Sidewalk around the
Recreation Center Block
Various Segments X 5 1 1 0 3 3 0 13
D9 New Sidewalk along 34th Ave to
connect Palm Blvd with Forest
Trail
Palm Blvd Forest Trail X Resident driven project
5 6 0 0 8 1 0 20
08/17/26
2026 MOBILITY STUDY 62CITY OF ISLE OF PALMS
APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING
TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD
ANALYSIS
PUBLIC
ENGAGEMENT
CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE
MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78
PLANNING
E1 Conduct a Road Diet Study
along Palm Boulevard between
Breach Inlet and the Connector
Breach Inlet IOP Connector X
Not Scored
E2 Evaluate feasibility of adding
a bus pull off at pedestrian
entrance to County Park
Point at Location X
Not Scored
E3 Evaluate Feasibility of New
Multi-Use Path in ROW
connecting 13th Ave to 20th Ave
(along Cassina Ave)
13th Ave 20th Ave X Along ditch behind Harris
Teeter - Feasibility and
alternative needs to be
assessed
Not Scored
OTHER PROJECTS
F1 Add Bike/Ped Amenities or
Golf Cart Parking at Major
Destination Points
Various Locations X
5 2 3 0 8 1 0 19
F2 Add Street Lights along streets
or at certain intersections and/
or crosswalks
Various Locations X
5 1 3 0 8 1 0 18
F3 Pave Off-Road Path parallel to
Palm Blvd sidewalk connecting
to Bunch Park
Cassina Ave 20th Ave X
5 5 0 3 3 0 0 16
F4 Pave Off-Road Path/goat path
adjacent to parking along
southside of Palm Blvd at 21st
Ave curve
21st Ave curve 21st Ave X X
5 5 0 6 3 0 0 19
F5 Add Bike/Ped Amenities near
Beach Access Points
Various Locations X 5 1 3 0 8 1 0 18
F6 Ensure beach access at
25th Ave and 34A are ADA
accessible/graded or mats
Point at Locations
5 6 1 6 8 6 0 32
F7 Sidewalk Drainage Project
along Palm Blvd
36th Ave 41st Ave X X Designed and permitted 5 6 0 4 3 6 0 24
63 2026 MOBILITY STUDY
CITY OF ISLE OF PALMS
08/17/26
APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING
TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD
ANALYSIS
PUBLIC
ENGAGEMENT
CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE
MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78
PLANNING
E1 Conduct a Road Diet Study
along Palm Boulevard between
Breach Inlet and the Connector
Breach Inlet IOP Connector X
Not Scored
E2 Evaluate feasibility of adding
a bus pull off at pedestrian
entrance to County Park
Point at Location X
Not Scored
E3 Evaluate Feasibility of New
Multi-Use Path in ROW
connecting 13th Ave to 20th Ave
(along Cassina Ave)
13th Ave 20th Ave X Along ditch behind Harris
Teeter - Feasibility and
alternative needs to be
assessed
Not Scored
OTHER PROJECTS
F1 Add Bike/Ped Amenities or
Golf Cart Parking at Major
Destination Points
Various Locations X
5 2 3 0 8 1 0 19
F2 Add Street Lights along streets
or at certain intersections and/
or crosswalks
Various Locations X
5 1 3 0 8 1 0 18
F3 Pave Off-Road Path parallel to
Palm Blvd sidewalk connecting
to Bunch Park
Cassina Ave 20th Ave X
5 5 0 3 3 0 0 16
F4 Pave Off-Road Path/goat path
adjacent to parking along
southside of Palm Blvd at 21st
Ave curve
21st Ave curve 21st Ave X X
5 5 0 6 3 0 0 19
F5 Add Bike/Ped Amenities near
Beach Access Points
Various Locations X 5 1 3 0 8 1 0 18
F6 Ensure beach access at
25th Ave and 34A are ADA
accessible/graded or mats
Point at Locations
5 6 1 6 8 6 0 32
F7 Sidewalk Drainage Project
along Palm Blvd
36th Ave 41st Ave X X Designed and permitted 5 6 0 4 3 6 0 24
Source: City of Isle of Palms website. First collected Oct 13, 2026.