Agenda
City of Isle of Palms · Charleston County · meeting of Jun 10, 2026 · Agenda packets
Open the original document More from City of Isle of Palms
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PLANNING COMMISSION AND
June 10, 2026
The public may view the public meeting at:
28TU28TUwww.youtube.com/user/cityofisleofpalmsU28TU28T
Public Comment: Citizens may provide public comment here:
https://www.iop.net/public-comment-form
AGENDA
The Isle of Palms Planning Commission will hold its regular meeting on
Wednesday, June 10, 2026, at 4:00 p.m. in Council Chambers of City Hall, 1207
Palm Boulevard.
A. Call to order and acknowledgment that the press and the public were duly
notified in accordance with state law.
B. Approval of minutes- April 15, 2026
C. Presentation- IOP Mobility Study- Berkeley, Charleston, Dorchester
Council of Governments
D. Miscellaneous business
E. Adjourn
1
Planning Commission Meeting
4:00pm, Wednesday, March 11, 2026
1207 Palm Boulevard, Isle of Palms, SC and
broadcasted live on YouTube: https://www.youtube.com/user/cityofisleofpalms
MINUTES
1. Call to Order
Present: Sue Nagelski, Tim Ahmuty, Ron Denton, Rich Steinert, Bill Laughlin,
Sandy Stone, Jeffrey Rubin
Also present: Todd Murphy (Environmental Advisory Committee)
Staff present: Administrator Kerr
2. Approval of minutes
MOTION: Mr. Stone made a motion to approve the minutes of the March 11, 2026
meeting. Ms. Nagelski seconded the motion. The motion passed unanimously.
3. Old Business
Discussion of changes to the lighting ordinance
Administrator Kerr said City Council had passed the lighting ordinance at First Reading, but they
want to see it improved before Second Reading. They implied the ordinance was overreach but
provided no feedback on how to improve the ordinance.
Mr. Todd Murphy of the Environmental Advisory Committee shared the development of the
ordinance in its current form. He said Folly Beach’s lighting ordinance seemed too technical and
restrictive to get passed. He shared that Chief Cornett prefers lit areas for safety reasons, but he
understands there needs to be a balance.
Administrator Kerr added that the idea is to get an ordinance passed and provide technical
guidance on lighting installation for new construction.
Exemptions to the ordinance and enforcement were discussed.
MOTION: Mr. Laughlin made a motion to amend Section 5-4-18(a) to state “Outdoor
lighting on residential structures must be shielded so that light is directed downward and
does not illuminate any other property or natural area including the Intracoastal
Waterway, marsh, or other natural areas,” and to strike Section 5-4-18(b). Mr. Denton
seconded the motion.
Planning Commission, 4/15/2026
Discussion ensued about exemptions to this portion of the ordinance.
MOTION: Mr. Laughlin made a motion to amend his original motion to keep Section 5-
4-18(b) as “The following outdoor lighting is exempt from the requirements of this
Section: Low-voltage lighting, including landscape lighting, Market lighting, Temporary
holiday lighting, and Dock safety lighting.” Mr. Denton seconded the amended motion.
There was a brief discussion about capping the length of time holiday lighting can remain up.
VOTE: A vote was taken on the motion and its amendment with all in favor.
Administrator Kerr said he will circulate the new draft of the ordinance to the Commissioners on
Thursday. Mr. Murphy said the Environmental Advisory Committee will work on lighting
guidelines for contractors.
4. Miscellaneous
The next meeting of the Planning Commission will be Wednesday, May 13, 2026 at 4:00pm.
5. Adjournment
Mr. Laughlin made a motion to adjourn, and Ms. Nagelski seconded the motion. The meeting
was adjourned at 5:04pm.
Respectfully submitted,
Nicole DeNeane
City Clerk
Memorandum
To: Isle of Palms Planning Commission
From: Kathryn S Basha and Wyatt Stitely, Regional Planners
Date: June 5, 2026
Re: IOP Mobility Study
The City contracted the BCDCOG a little over a year ago to assist with assessing conditions
and gaps in the island’s non -vehicular transportation facilities and system. The following is a
summary of the project goals, activities, and expectations of the Planning Commission as the
Mobility study reaches an important stage of identifying and prioritizing projects to improve
the system in the future.
Project Purpose:
The Mobility Study seeks to provide the city with guidance and a toolkit for not only
maintaining, but also improving safety, accessibility, and connectivity around the island in
the future. The main components of this Study are to:
• Assess the existing conditions of IOP’s current infrastructure
• Identify any gaps in the network to/from popular destinations
• Gather public input on network needs
• Provide the City with a set of prioritized projects and recommendations to be
implemented in the future as funding allows
Recommended projects are centered around improving and expanding infrastructure to
better connect destinations, improve safety, and encourage walkability.
Activities:
A multi-faceted process has been used to identify recommended projects. The project began
with a review of existing plans, including but not limited to, the City’s comprehensive plan .
Next, a comprehensive inventory was taken of all existing walking/biking facilities on the island.
This field survey focused on documenting key characteristics of these facilities: surface type
and condition, pavement width, ADA compliance, the presence of obs tructions, separation
from vehicular travelways and gaps in the network. Mapping the inventory allowed COG staff
to preliminarily identify areas of concern.
Page | 2
Mobility Study Update
June 5, 2026
While the inventory was taking place, several activities were conducted to gather public input.
COG staff met with the City’s safety committee and other stakeholder groups. An online
survey was distributed by the City and a public open house hosted at the recreation center.
Both the survey and public open house focused on gathering the general public’s input on
areas where the current network is lacking critical connections to frequented destinations, is
in need of repair or safety improvements, and/or where new facilities are desired. This was also
an opportunity to assess the public’s use of these facilities in comparison to mobility goals
contained within the plans that were reviewed. Participation in the survey and/or open house
was encouraged via the City’s website and social media and was shared by major media
outlets. Most participants were City residents, almost all of which live on the island full -time,
with over half reporting being residents for over ten years. Other participants were property
and/or business owners, with several online survey participants being frequent visitors to island.
All comments provided by participants were documented and considered in developing a
list of candidate projects to be considered.
Assessment of Potential Projects:
COG staff has mapped and vetted over fifty recommended projects. The matrix provided
herein as an attachment provides a list of those projects categorized by project type: e.g. bike
lanes, sidewalks, and crosswalks/intersections. Details regarding the location of the projects,
whether they were identified through the condition inventory or by the public are also
provided. Notations as to whether these projects are recently completed, already in process
or have identified funding are provided in the “comments” column. Maps of all projects, by
category, are provided on the second attachment.
The COG’s project team will be at the Commission’s meeting on June 10 th to review these
projects. Prior to the meeting, COG staff will complete a technical scoring of each project
based on whether a project addresses: (1) Access to high frequency destinations, (2) Safety
issues, (3) Improvements in design for existing facilities (4) Gaps in the network’s connectivity,
and (5) Whether a project is part of a larger/regional network or overlaps with other projects.
An updated matrix of scored projects will be provided at the meeting.
Next Steps
The City and COG project teams are requesting the Commission’s assistance in identifying
which of the 50+ projects should be prioritized for implementation. Results of the scoring will be
shared with the Commission at its July meeting. Using a combination of technical scoring and
individual Commissioner’s priorities, high level cost estimates will be developed for the
prioritized projects and recommended to City Council in a final report later this Summer.
We look forward to discussing the projects on June 10th. Please feel free to reach out to either
of us via email prior to the meeting if you have any questions.
Kathryn Basha, Planning Director: kathrynb@bcdcog.com
Wyatt Stitely, Regional Planner: wyatts@bcdcog.com
Attachment 1: Potential Projects _June 2026
Label Recommended Project Endpoint 1 Endpoint 2 Length (Feet) Project Type Field Analysis Public Engagement # of Comments City Comments/Recommendation
A1 Restripe existing Bike Lane markings along Palm Blvd Breach Inlet IOP Connector 8823.5 ft Bike Lanes X X 10
A2 Add a Bike Lane (Sharrow) along Ocean Blvd, Charleston Blvd and 14th Ave to follow B2B Route Ocean Blvd Dead End IOP Connector 9163.7 ft Bike Lanes X 2 Follows the B2B route
A3 Add a Bike Lane (Sharrow) along JC Long Blvd Ocean Blvd Palm Blvd 1013.2 ft Bike Lanes X 4
A4 Extend dedicated Bike Lane along Palm Blvd 10th Ave IOP Connector 1509.8 ft Bike Lanes X 7
A5 Extend Bike Lane along both sides of IOP Connector to fully connect with Palm and front beach End of Bridge Palm Blvd 384.8 ft Bike Lanes X X 3 Outbound connection is a critical gap (TOP Priority for the City);
A6 Add a Bike Lane (Sharrow) along Palm Blvd heading north IOP Connector 41st Ave 10421.4 ft Bike Lanes X 8
A7 Add a Bike Lane (Sharrow) along Hartnett Blvd 22nd Ave 41st Ave 8227.0 ft Bike Lanes X 1 ROW concerns
A8 Add a Bike Lane (Sharrow) along Waterway Blvd 21st Ave 41st Ave 8755.8 ft Bike Lanes X 10 New 8ft multi-use path under construction along Waterway. Is dedicated Bike possible?
A9 Add a Bike Lane (Sharrow) along 41st Ave Palm Blvd Marina 2298.1 ft Bike Lanes X 1
B1 Mark Crosswalks to Beach Access Points along Ocean Blvd Beach Access 1b Beach Access 9 Crosswalks & Intersections X X
B2 Improve Markings and potentially add pedestrian Signage/Signals along Ocean Blvd in Front Beach 10th Ave 14th Ave Crosswalks & Intersections X X 2
B3 New Crosswalk at JC Long Blvd and Palm Blvd Intersection Crosswalks & Intersections X X 3
B4 New Crosswalk near Public Safety Building along JC Long Blvd Crosswalks & Intersections X 5
B5 New Crosswalk near City Hall along Palm Blvd Crosswalks & Intersections X 6
B6 IOP Connector Crosswalk & Intersection overeall Improvement Crosswalks & Intersections X X 17
B7 New Crossing with Signage/Signals at Palm Blvd and 20th Avenue Crosswalks & Intersections X 6
B8 Improve Crosswalk Safety and Visability at 21st Ave and Palm Blvd Intersection Crosswalks & Intersections X 7
B9 Improve Crosswalk Safety potentially with new signage/signals along Palm Blvd at Beachside Ave Crosswalks & Intersections X 4
B10 Improve markings and potentially add pedestrian Signage/Signals at 25th Ave and Palm intersection Crosswalks & Intersections X 5
B11 New Crosswalk at Waterway Blvd and 28th Ave Crosswalks & Intersections X 4
B12 New Crosswalks at 29th Ave and both Palm Blvd and Waterway Blvd Intersections Crosswalks & Intersections X 6
B13 Improve Crosswalk at 30th Ave and Palm Blvd Crosswalks & Intersections X 2
B14 New Crosswalk with Signage/Signals at 41st Ave Beach Access Crosswalks & Intersections X 2 May be too close to curve for DOT to approve
B15 Intersection Improvement at Palm Blvd and 41st Ave Crosswalks & Intersections X 4 Project underway
B16 Improve Crosswalk Markings at Palm Blvd and 43rd Ave Intersection Crosswalks & Intersections X X 1 Project is underway Complete
B17 Improve Crosswalks at Palm Blvd and Wild Dunes Entrance Gate (46th) Crosswalks & Intersections X 1 Project is underway
Consistent Crosswalk Markings on all Side Streets (Various Locations) Maintenance & Enforcement X
Continuous Removal or Enforcement of Obstructions (Various Locations) Maintenance & Enforcement X X 3
Repair Cracked, Damaged, Eroded, or Uneven Sidewalk Segments (Various Locations) Sidewalk Improvements X X 3
C1 Widen Sidewalk along Ocean Blvd & 14th Ave in Front Beach Commercial Area 10th Ave IOP Connector 2255.2 ft Sidewalk Improvements X X 3 ROW constraints and fitting as much parking as practical
C2 Widen Sidewalk along 21st Street Palm Blvd Waterway Blvd 1145.5 ft Sidewalk Improvements X 1 Sidewalk replaced/extended to Palm at beach access in 2025
C3 Improve Sidewalk along all of Waterway Blvd 21st Ave 41st Ave 8755.8 ft Sidewalk Improvements X 9 New 8ft multi-use path under construction along Waterway Blvd
C4 Widen Sidewalk along Palm Blvd 21st Ave 41st Ave 8251.2 ft Sidewalk Improvements X 3 Working with DOT on project improvement and coordinating with TST; Long-range idea
C5 Improve shoulder with a sidewalk along 41st Ave Palm Blvd Marina 2298.1 ft Sidewalk Improvements X X 6
C6 Widen Sidewalk along Palm Blvd 41st Ave 57th Ave 5973.7 ft Sidewalk Improvements X 4
D1 Extend Sidewalk along Palm Blvd Carolina Blvd 10th Ave 6129.6 ft New Sidewalk X X 2 TST funding allocated and engineering done to extend sidewalk; Phase 1 is from Carolina to 2nd Ave
D2 Extend Sidewalk along Ocean Blvd Beach Access 1b Beach Access 6 2894.6 ft New Sidewalk X 1
D3 Sidewalk Extension along JC Long Blvd to Ocean Blvd End of Sidewalk Ocean Blvd 199.7 ft New Sidewalk X Approved TST funding to extend sidewalk (at-grade sidewalk)
D4 New and Extend Sidewalk along IOP Connector End of Bridge Palm Blvd 224.6 ft New Sidewalk X X 3
D5 New Sidewalk/Multi-Use Path that connects Hartnett Blvd to 21st Ave 21st Ave 22nd Ave 440.2 ft New Sidewalk X 1 Would need easement between two private properties/ newer homes
D6 New Sidewalk along 28th Ave from Waterway to back of Rec. Rec Center Waterway Blvd 479.4 ft New Sidewalk X X 2 Recently finished 28th along Palm, sidewalk to Waterway would make sense
D7 New Sidewalk along 34th Ave to connect Palm with Forest Trail Palm Blvd Forest Trail 1011.0 ft New Sidewalk X 3 Resident driven project
E1 Conduct a Road Diet Study along Palm Boulevard between Breach Inlet and the Connector Breach Inlet IOP Connector 8823.5 ft Planning X
E2 Evalaute feasibility of adding a bus pull off at pedestrian entrance to County Park Planning X
E3 Evaluate Feasibility of New Multi-Use Path in ROW connecting 13th Ave to 20th Ave (along Cassina Ave) 13th Ave 20th Ave 1522.3 ft Planning X Along ditch behind Teeter - Feasibility and alternative needs to be assessed
F1 Add Bike/Ped Amenities or Golf Cart Parking at Major Destination Points (Various Locations) Other X 9
F2 Add Street Lights along streets or at certain intersections and/or crosswalks (Various Locations) Other X 8
F3 Pave Off-Road Path parallel to Palm Blvd sidewalk connecting to Bunch Park Cassina Ave 20th Ave 281.0 ft Other X
F4 Pave Off-Road Path/goat path along southside of Palm Blvd at 21st Ave curve 21st Ave curve 21st Ave 636.5 ft Other X X
F5 Add Bike/Ped Amenities near Beach Access Points (Various Locations) Other X 6
F6 Ensure beach access at 25th Ave and 34A are ADA accessible/graded or mats Other 1
F7 Sidewalk Drainage Project along Palm Blvd 36th Ave 41st Ave 2248.1 ft Other X X Designed and permitted
Island-wide
A5
A3
A4
A9A7
A1
A8
A2
A6
Vantor
Project Type
Bike Lanes
Crosswalks & Intersections
New Sidewalk
Other
Planning
Sidewalk Improvements
West End Front Beach Central
B2B1
B12
B15
B6 B7
B17B12
B14
B11
B3
B4 B16B10B9
B8B5
B10
B13
Earthstar Geographics
Project Type
Bike Lanes
Crosswalks & Intersections
New Sidewalk
Other
Planning
Sidewalk Improvements
Project Type
Crosswalks & Intersections
Other
Planning
West End Front Beach Central
C2
C1
C5
C6
C4
C3
Vantor
Project Type
Bike Lanes
Crosswalks & Intersections
New Sidewalk
Other
Planning
Sidewalk Improvements
West End Front Beach Central
E3
E1 E2
Vantor
Project Type
Bike Lanes
Crosswalks & Intersections
New Sidewalk
Other
Planning
Sidewalk Improvements
Project Type
Crosswalks & Intersections
Other
Planning
West End Front Beach Central
F3
F4
F2
F1
F2
F7
F1
F5 F5 F5 F5F5
F1
F1 F1
F2
F2
F2
F6 F6
Vantor
Project Type
Bike Lanes
Crosswalks & Intersections
New Sidewalk
Other
Planning
Sidewalk Improvements
Project Type
Crosswalks & Intersections
Other
Planning
West End Front Beach Central
D3
D4 D5
D6
D7
D2
D1
Vantor
Project Type
Bike Lanes
Crosswalks & Intersections
New Sidewalk
Other
Planning
Sidewalk Improvements
West End Front Beach Central
LABEL RECOMMENDED PROJECT MAPPED ENDPOINT 1 ENDPOINT 2 LENGTH (FEET) PROJECT TYPE FIELD ANALYSIS PUBLIC
ENGAGEMENT
A1 Restriping existing Bike Lane markings along Palm Blvd Line Breach Inlet IOP Connector 8823.5 ft Bike Lanes X X
A2 Add a Bike Lane (Sharrow) along Ocean Blvd, Charleston Blvd and 14th Ave to follow B2B Route Line Ocean Blvd Dead End IOP Connector 9163.7 ft Bike Lanes X
A3 Add a Bike Lane (Sharrow) along JC Long Blvd Line Ocean Blvd Palm Blvd 1013.2 ft Bike Lanes X
A4 Extend dedicated Bike Lane along Palm Blvd Line 10th Ave IOP Connector 1509.8 ft Bike Lanes X
A5 Extend Bike Lane along both sides of IOP Connector Line End of Bridge Palm Blvd 384.8 ft Bike Lanes X X
A6 Add a Bike Lane (Sharrow) along Palm Blvd Line IOP Connector 41st Ave 10421.4 ft Bike Lanes X
A7 Add a Bike Lane (Sharrow) along Hartnett Blvd Line 22nd Ave 41st Ave 8227.0 ft Bike Lanes X
A8 Add a Bike Lane (Sharrow) along Waterway Blvd Line 21st Ave 41st Ave 8755.8 ft Bike Lanes X
A9 Add a Bike Lane (Sharrow) along 41st Ave Line Palm Blvd Marina 2298.1 ft Bike Lanes X
B1 Marked Crosswalks at Beach Access Points along Ocean Blvd Line Beach Access 1b Beach Access 9 Crosswalks & Intersections X X
B2 Improve Markings and potentially add pedestrian Signage/Signals along Ocean Blvd in Front Beach Line 10th Ave 14th Ave Crosswalks & Intersections X X
B3 New Crossing at JC Long Blvd and Palm Blvd Intersection Point Crosswalks & Intersections X X
B4 New Crosswalk near Public Safety Building along JC Long Blvd Point Crosswalks & Intersections X
B5 New Crosswalk near City Hall along Palm Blvd Point Crosswalks & Intersections X
B6 IOP Connector Crosswalk & Intersection Improvement Point Crosswalks & Intersections X X
B7 New Crossing with Signage/Signals at Palm Blvd and 20th Avenue Point Crosswalks & Intersections X
B8 Improve Crosswalk Safety and Visability at 21st Ave and Palm Blvd Intersection Point Crosswalks & Intersections X
B9 Improve Crosswalk Safety potentially with new signage/signals along Palm Blvd at Beachside Ave Point Crosswalks & Intersections X
B10 Improve markings and potentially add pedestrian Signage/Signals at 25th Ave intersections Point Crosswalks & Intersections X
B11 New Crosswalk at Waterway Blvd and 28th Ave Point Crosswalks & Intersections X
B12 New Crossings at 29th Ave and both Palm Blvd and Waterway Blvd Intersections Point Crosswalks & Intersections X
B13 Improve Crosswalk at 30th Ave and Palm Blvd Point Crosswalks & Intersections X
B14 New Crossing with Signage/Signals at 41st Ave Beach Access Point Crosswalks & Intersections X
B15 Intersection Improvement at Palm Blvd and 41st Ave Point Crosswalks & Intersections X
B16 Improve Crosswalk Markings at Palm Blvd and 43rd Ave Intersection Point Crosswalks & Intersections X X
B17 Crossing Improvement at Palm Blvd and Wild Dunes Entrance Gate Point Crosswalks & Intersections X
C1 Widen Sidewalk along Ocean Blvd & 14th Ave in Front Beach Commercial Area Line 10th Ave IOP Connector 2255.2 ft Sidewalk Improvements X X
C2 Widen Sidewalk along 21st Street Line Palm Blvd Waterway Blvd 1145.5 ft Sidewalk Improvements X
C3 Improve Sidewalk along all of Waterway Blvd Line 21st Ave 41st Ave 8755.8 ft Sidewalk Improvements X
C4 Widen Sidewalk along Palm Blvd Line 21st Ave 41st Ave 8251.2 ft Sidewalk Improvements X
C5 Improve shoulder as a sidewalk along 41st Ave Line Palm Blvd Marina 2298.1 ft Sidewalk Improvements X X
C6 Widen Sidewalk along Palm Blvd Line 41st Ave 57th Ave 5973.7 ft Sidewalk Improvements X
D1 Sidewalk Extension along Palm Blvd Line Carolina Blvd 10th Ave 6129.6 ft New Sidewalk X X
D2 Extend Sidewalk along Ocean Blvd Line Beach Access 1b Beach Access 6 2894.6 ft New Sidewalk X
D3 Sidewalk Extension along JC Long Blvd to Ocean Blvd Line End of Sidewalk Ocean Blvd 199.7 ft New Sidewalk X
D4 New and Extend Sidewalk along IOP Connector Line End of Bridge Palm Blvd 224.6 ft New Sidewalk X X
D5 New Sidewalk/Multi-Use Path that connects Hartnett Blvd to 21st Ave Line 21st Ave 22nd Ave 440.2 ft New Sidewalk X
D6 New Sidewalk along 28th Ave Line Rec Center Waterway Blvd 479.4 ft New Sidewalk X X
D7 New Sidewalk along 34th Ave Line Palm Blvd Forest Trail 1011.0 ft New Sidewalk X
E1 Conduct a Road Diet Study along Palm Boulevard between Breach Inlet and the Connector Line Breach Inlet IOP Connector 8823.5 ft Planning X
E2 Evalaute feasibility of adding a bus pull off at pedestrian entrance to County Park Point Planning X
E3 Evaluate Feasibility of New Multi-Use Path in ROW connecting 13th Ave to 20th Ave (or along Cassina Ave) Line 13th Ave 20th Ave 1522.3 ft Planning X
F1 Add Bike/Ped Amenities or Golf Cart Parking at Major Destination Points (Various Locations) Point Other X
F2 Add Street Lights along streets or at certain intersections and/or crosswalks (Various Locations) Both Other X
F3 Pave Off-Road Path along Palm Blvd Line Cassina Ave 20th Ave 281.0 ft Other X
F4 Pave Off-Road Path on Palm Blvd at 21st Ave curve Line 21st Ave curve 21st Ave 636.5 ft Other X X
F5 Add Bike/Ped Amenities near Beach Access Points (Various Locations) Point Other X
F6 Ensure beach access at 25th Ave and 34A are ADA Accessible Points 25th Ave & 34A Other X
F7 Sidewalk Drainage Project along Palm Blvd Line 36th Ave 41st Ave 2248.1 ft Other X X
Consistent Crosswalk Markings on all Side Streets (Various Locations) Not Mapped Crosswalks & Intersections X
Continuous Removal or Enforcement of Obstructions (Various Locations) Not Mapped Maintenance & Enforcement X X
Repair Cracked, Damaged, Eroded, or Uneven Sidewalk Segments (Various Locations) Not Mapped Maintenance & Enforcement X X
BIKE LANES
CROSSW ALKS & INTERSECTIONS
SIDEW ALK IMPROVEMENTS
NEW SIDEW ALKS
PLANNING