STATE OF SOUTH CAROLINA ) AGREEMENT RELATED TO BEACH
) RESTORATION ACTIVITIES FOR
COUNTY OF CHARLESTON ) IOP NORTH END OF ISLAND
This AGREEMENT (“Agreement”) is made and entered into this ____ day of May 2026
by and between the City of Isle of Palms, S.C., a South Carolina municipal corporation (the “City”)
and the Wild Dunes Community Association, Inc. (the “Association”), a South Carolina nonprofit
corporation, collectively referred to as “the Parties.”
WHEREAS, the City completed large-scale beach renourishment projects in 2008 and
2018 as well as subsequent erosion mitigation activities to address the severe beach erosion caused
primarily by the natural processes of major storms (Matthew (2016) and Irma (2017)), and a shoal
attachment (2025) at the northeastern end of the Isle of Palms (the “Island”) – in each case with
significant funds provided by the Association and its constituents; and
WHEREAS, despite these efforts, severe erosion has continued in certain localized hotspot
erosional areas due to the ongoing natural processes and dynamic inlet conditions on the north and
south ends of the Island; and
WHEREAS, the added impacts of severe beach erosion from Hurricanes Dorian in 2019,
Hanna in 2020, and Erin in 2025, and sea level rise have resulted in public and private emergencies
which affect the health and safety of the public and private property owners in the affected areas,
as well as access for the public to the eroded beach areas; and
WHEREAS, it has been determined and agreed to by all parties that the best course of
action presently available to address these emergencies is an offshore dredging project to pump
beach-compatible sand from the floor of the Atlantic Ocean to the eroded beach areas (the
“Restoration Project”); and
WHEREAS, the Association and its members collectively have valuable real property
interests that are or are expected to be subjected to imminent peril as a result of the erosion caused
by the process of the shoal attachment on the northern end of the Island, and the impacts of recent
hurricanes;
WHEREAS, the Association desires that the City undertake the Restoration Project and is
willing to assist the City in the performance of the Project, is willing to actively assist with
obtaining temporary easements for the City and its contractors if necessary for the Project, and is
willing to provide financial support for the Restoration Project; and
WHEREAS, the City derives a public benefit from the private property and public beaches
in the affected areas through the generation of real property taxes, accommodation and hospitality
fees, the public’s use and enjoyment of the beaches, and the preservation of the City’s and the
State of South Carolina’s tourism industry; and
2
WHEREAS, the City desires to protect the health and safety of the public by trying to
prevent infrastructure, sewer, and construction debris from being swept into the waters
surrounding the City; and
WHEREAS, two conditions to the issuance of any state or federal permitting for the
Restoration Project are that all sandbags, previously placed in the affected areas must be removed
by the person or entity who placed them, prior to the project’s start, and all non-beach-compatible
sand contained in any such bags must be removed from the beach and disposed of in a proper
manner; and
WHEREAS, the City has funded and coordinated the work necessary for the issuance of
the appropriate state and federal agency permits (the “Permits”) to conduct the Restoration Project,
and issuance of the Permits should occur soon.
NOW THEREFORE, in consideration of the premises and the mutual covenants and
promises of the Parties hereto set forth in this Agreement, the Parties agree as follows:
1. CITY’S WORK.
A. For purposes of this Agreement, the “City’s Work” is defined as all activities allowed
or required by the Permits for the Restoration Project within the vicinity of the beach
within Reaches One and Two as depicted in Coastal Science Engineering (“the
Engineer”) plans dated February 18 2026 (the “Plans”) and attached herein as Exhibit
1, except as otherwise stated in this Agreement, including, but not limited to, off-shore
dredging activities, consultants, construction administration, all monitoring required by
the Permits, all sand tilling required by the Permits, depositing dredged sand, and sea
turtle protection and monitoring activities required by the Permits.
B. For purposes of this Agreement, the City’s Work does not include any work outside of
Reaches One and Two. The City is working separately on Reach Three, but that work
is excluded from this Agreement and no funds from the Association will be used for
any work associated with Reach Three. (See sheet six of the Plans.)
C. For purposes of this Agreement, the City’s Work includes the removal of sandbags
placed by the City and some of the Association’s members. This removal must happen
as a condition of prior Emergency Orders issued to the City and because this condition
predates this agreement, no funds from the Association will be used for the removal of
sandbags.
D. The City’s Work does not include any inspections, engineering, repairs, or other costs
regarding the condition, safety, or structural integrity of any building, either before,
during, or after completion of the City’s Work.
E. The City’s Work does not include the removal or disposal of any building debris,
including, but not limited to, concrete, wood, glass, sheetrock, or pipes, which is
located on or near the active beach.
3
2. ESTIMATED COSTS FOR THE CITY’S WORK.
A. The cost for the City’s Work under this Agreement is estimated by the City to be up to
Fifteen Million Two Hundred Twenty-four Thousand Eight Hundred Sixty-Five dollars
and no/100 ($15,224,865.00) Dollars. The City’s Work costs include but are not limited
to all fees and costs incurred by City associated with: any additional permitting;
dredging; sand placement; engineering; consultants; legal; sand tilling required by the
Permits; sea turtle protection and monitoring activities required by the Permits; and all
other fees and costs incurred by the City in order to comply with the Permits and
complete the City’s Work.
B. The City’s contribution may be reduced by contributions toward the costs of the City’s
Work made by any other state, federal or local political subdivision. Such outside
contributions would not reduce the Association’s Contribution.
C. The City shall not perform or complete the City’s Work under the Permits unless and
until the balance of the costs for the City’s Work has been funded by the City’s
Contribution, the Association’s Contribution, and state / federal sources.
D. The City agrees to maintain separate accounting records for the City’s Work. All
records of the City’s Work shall be available for inspection by the Association at all
reasonable times.
3. COST SHARING.
A. Basis. The basis for the cost sharing between the City and the Association is the
percentage of funds generated on the Island from Accommodations Taxes which in
part, funds the City’s Beach Preservation Fund. This percentage was determined by
using the reported gross income for short term rental licenses and business licenses for
the 2025 license year, not actual Accommodations Taxes collected. The Parties agree
that this percentage in 2025 was 47% from members of the Association and 53% from
all other properties outside of the association and the schedule of reported revenues is
attached to this Agreement as Exhibit 2.
B. Sharing Percentages. In recognition of these contributions, the City and the Association
agree that they will share the costs of the City’s Work on a 47% by the City - 53% by
the Association as provided in the attached Exhibit 3. The City anticipates that the north
end project will involve approximately 1.7 million cubic yards of sand; however, the
Association acknowledges that the final scope of the project may vary due to factors
beyond the City’s control, including but not limited to natural conditions. The City
agrees to provide the Association with reasonable notice if the anticipated scope of the
project is expected to materially change.
4
B.C. Additional Costs. Additional project costs will be split based on a pro rata share of
placed sand as provided in 3B.
C.D. City Exclusive Costs. The City will fund 100% of all project costs in Reach 3,
located at the southern end of the Island, which is excluded from this Agreement, based
on its share of the total volume of sand placed across all Reaches. An example of this
calculation is provided herein as Exhibit 3.
D.E. Change Orders. The City will not execute change orders for the construction project
that change the cost or amount of sand placement without prior written approval from
the Association.
4. ESCROW DEPOSIT TOWARD COSTS OF THE RESTORATION PROJECT.
A. Association’s Contribution. The Association agrees to deposit the full amount of the
Association’s Contribution in escrow with the City no later than ten (10) days from the
date City Council votes on and approves this Agreement. 30 days from the date of
receiving bids. TIME IS OF THE ESSENCE. This amount shall be placed in an
interest-bearing bank account and held in trust by the City pending the execution of
this Agreement, and all accrued interest shall be credited to the Association’s
Contribution.
B. Replenishment of Escrow Account. If at any time both parties agree to expand the scope
or scale of the Restoration Project and the amounts dictated by this agreement are
insufficient, the City shall provide a written amendment to this Agreement. The
Association agrees to replenish the escrow account with enough money to restore the
deficit within thirty (30) days from the date of City’s written amendment (the
“Replenishment Deposit”). TIME IS OF THE ESSENCE.
C. Refund upon failure to make Initial Deposit or Replenishment Deposit. If the
Association fails to make the initial escrow deposit of the Association’s Contribution
as set forth in paragraph (A) of this Section or any subsequent Replenishment Deposits
as set forth in paragraph (B) of this Section, then the City has the right to terminate the
City’s Work without further notice and withdraw its application for the Permits or, if
issued, surrender or transfer the Permits. In such case, the balance of the escrow
deposit, if any, will be refunded to the Association ninety (90) days after all fees and
costs already incurred in connection with the City’s effort to execute the City’s Work
pursuant to this Agreement have been satisfied.
5. REFUND OF REMAINING BALANCE UPON COMPLETION OF RESTORATION
PROJECT. Substantial Completion shall occur upon the Engineer’s written confirmation
that all beach fill quantities included in the Base Bid and any awarded Alternates have been
placed in accordance with the Contract Documents. Final Completion shall occur upon
completion of all remaining Work, including final grading, demobilization, close-out
documentation, and the City’s formal acceptance of the Work following Engineer’s
5
recommendation for final payment for the project. No later than ninety (90) days after Final
Completion, the City will refund any remaining balance of the Association’s Contribution
after paying the costs of the City’s Work.
6. TIME PERIOD FOR COMPLETION OF RESTORATION PROJECT. The time period
for completion of the Restoration Project shall be set forth in the Permits or any extensions
or amendments thereto. If extensions for the Permits are needed, the City will use
commercially reasonable efforts to obtain such extensions. If the City is unable, for any
reason whatsoever, to perform or complete the Restoration Project by the expiration date
of the Permits or any extensions or amendments thereto, the balance of the Association’s
Contribution remaining in escrow, if any, will be refunded to the Association ninety (90)
days after all fees and costs incurred in connection with the City’s effort to execute the
City’s Work prior to such expiration date have been satisfied, unless otherwise requested
in writing by the Association.
7. CONSTRUCTION AND RESTORATION EASEMENTS. The Association agrees to
work cooperatively with the City to secure temporary easements from the owners adjacent
to and abutting the City’s Work area prior to the commencement of the Restoration Project.
8. ADMINISTRATION OF THE CITY’S WORK. The City shall have sole authority and
control over the City’s Work under the Permits. The City, in consultation with its advisers,
will negotiate and enter into all contracts which will delineate the exact scope and detail of
the City’s Work under the Permits.
9. PERMIT APPLICATIONS.
A. Permits. Necessary Permits have been applied for and are nearing issuance prior to the
execution of this Agreement.
B. Additional Permits. Additional Permits are not anticipated and not addressed herein.
10. ACKNOWLEDGEMENT OF RISKS; RELEASE AND INDEMNIFICATION OF THE
CITY.
A. The Association understands and agrees that, due to the nature of the dynamics of
storms, winds, currents and tides of the Atlantic Ocean, and the current severity of the
erosion, there is no promise or guarantee from the City or any other person that the
City’s Work under the Permits will be successful in alleviating or eliminating erosion;
continued, severe erosion may continue to occur because of natural causes during and
after the administration of the Restoration Project per the Permits; a substantial portion
or all of the sand placed on the beaches as part of the Restoration Project could be
washed away by a major storm event or tide; and that the City’s Work under the Permits
and/or Additional Permits may be delayed, postponed or canceled because of
permitting requirements, insufficient funding, acts of God, labor shortages, labor
strikes, material shortages, or other factors beyond the reasonable control of City.
6
B. The Association understands and agrees that any risk to the structural integrity of any
Association owned building caused by the removal of erosion control measures,
including, but not limited to, wave dissipation devices and sandbags, shall be borne by
the owner of the affected building. The Association hereby releases the City and its
officials, agents, employees, inspectors or advisers from any and all claims against City
for property damage to the Association’s property caused by the removal of such
erosion control measures.
C. The Association hereby releases the City and its officials, agents, employees, inspectors
or advisers from any and all claims against City for property damage to the
Association’s property caused by erosion or the failure of the City’s Work under the
Permits to alleviate, eliminate or delay the erosion of Association’s property. This
release does not extend to any claims against the dredging contractor(s), the
contractor(s) performing Erosion Mitigation Activities, or the engineer engaged by
City in performance of the City’s Work under the Permits.
D. The Association, the City, the City’s contractor and the City’s engineer each will
maintain liability insurance for its actions and omissions in an amount equal to the
amount stated in the bid documents; i.e., a minimum of $___ million single; $____
million aggregate.
E. The Association hereby agrees to hold harmless and indemnify the City, its officials,
agents, employees, inspectors or advisers against any loss or damage, including
reasonable attorney’s fees and expenses, incurred as a result of any claims against the
City or its officials, agents, employees, inspectors or advisors for personal injury or
property damages in connection with the City’s Work under the Permits except to the
extent that such loss is caused by any negligent or reckless act of the City or its officials,
agents, employees, inspectors or advisers. This indemnification does not extend to any
claims against the dredging contractor(s), the contractor(s) performing Erosion
Mitigation Activities, or the engineer engaged by City in performance of City’s Work.
11. NOTICES. All notices, consents, approvals and requests required by any provision of this
Agreement shall be in writing and shall be deemed to be properly given and received when
personally delivered to the representatives of each party or when deposited in the United
States mail, registered or certified, with return receipt requested, postage prepaid. All
notices to the City of Isle of Palms shall be addressed to Mr. Douglas Kerr, City
Administrator, 1207 Palm Blvd., Isle of Palms, SC 29451. Notices to any other party to
this Agreement shall be mailed to the address on record with Charleston County or at such
other address as the party may hereafter designate in writing to the City.
12. MISCELLANEOUS PROVISIONS.
A. Binding Agreement. The parties hereto respectively bind themselves and their
successors and assigns with respect to all covenants, agreements and obligations
contained in this Agreement. Any party may assign its rights under this Agreement
upon written notice to all other parties of such assignment.
7
B. Governing Law and Venue. This Agreement shall be governed by and construed in
accordance with the laws of the State of South Carolina, without regard to its choice of
law principles. Any action arising under this Agreement shall be brought exclusively
in the state courts located in Charleston County, South Carolina, and the Parties consent
to the jurisdiction of such courts.
C. Enforcement and Remedies. Subject to the Dispute Resolution section of this
Agreement, if any party breaches this Agreement, the non-breaching party may pursue
any and all remedies available at law or in equity, including specific performance and
injunctive relief, and all such remedies shall be cumulative. In the event of any
proceedings relating to or arising from this Agreement, the prevailing party shall be
entitled to recover all of their expenses from the non-prevailing party, including, but
not limited to attorneys’ fees, costs, and expenses.
D. Dispute Resolution. Except for claims seeking temporary, preliminary, or permanent
injunctive or other equitable relief to prevent irreparable harm, the Parties shall
participate in non-binding mediation as a condition precedent to filing any lawsuit or
initiating any other formal legal proceeding arising out of or relating to this Agreement,
its interpretation, performance, breach, or termination. The mediation shall be
conducted in person in Charleston County, South Carolina, unless the Parties mutually
agree in writing to conduct the mediation by videoconference or at another location. A
Party seeking mediation shall provide written notice to the other Party of their desire
to mediate the dispute. If the Parties are unable to agree upon a mediator within fifteen
(15) days after the notice, the City and Association shall each propose a mediator, and
the two proposed mediators shall select a mediator for the Parties. The mediation shall
occur within sixty (60) days after delivery of the notice, subject to the mediator’s
availability and any mutually agreeable and written extension between the Parties. The
Parties shall share the mediator’s fees and administrative costs equally, unless they
agree otherwise in writing. Each Party shall bear its own attorneys’ fees and costs
incurred in connection with the mediation. Notwithstanding the foregoing, the Parties
may mutually agree in writing to forego pre-suit mediation.
E. No Joint Venture. This Agreement is not to be construed as creating, nor does it create,
a joint venture or partnership between the parties for any purpose, or authorizing any
party to act as agent for another party.
F. Entire Agreement. This Agreement constitutes the entire agreement between the parties
hereto. Any amendments hereto shall be in writing and signed by all parties hereto.
G. Multiple Counterparts. This Agreement may be executed in any number of counterparts
with the same effect as if all the signing parties had signed the same document. All
counterparts shall be construed together and constitute the same instrument.
8
IN WITNESS WHEREOF, the parties hereto have hereunto set their hands and seals, by
and through the undersigned agents, as of the date stated above.
WITNESS:
_________________________ The City of Isle of Palms, SC
_________________________ By: ____________________________
Title: __________________________
_________________________
_________________________ Wild Dunes Community Association, Inc.
_________________________
By: ____________________________
Title: __________________________
9
EXHIBIT 1
(ATTACH ENGINEER’S PLANS DATED FEBRUARY ___, 2026)
10
EXHIBIT 2
(ATTACH 2025 LICENSE YEAR DATA)
11
EXHIBIT 3
(ATTACH EXAMPLE OF PROJECT COST CALCULATION)