Beach Preservation Committee
9:00 a.m., Tuesday, April 21, 2026
1207 Palm Boulevard
City Hall Council Chambers
Public Comment:
All citizens who wish to speak during the meeting must email their first and last name, address
and topic to Nicole DeNeane, City Clerk, at nicoled@iop.net no later than 3:00 p.m. the day
before the meeting. Citizens may also provide written public comment here:
https://www.iop.net/public-comment-form
A
genda
1. Call to order and acknowledgment that the press and the public have been duly
notified of the meeting in accordance with the Freedom of Information Act.
2. Citizens’ comments- All comments have a time limit of three (3) minutes.
3. New Business- Applying the Beach Committee’s new definition of a “healthy
beach” at the 3 trouble spots and calculating required sand volumes for the
upcoming renourishment project.
4. Miscellaneous Business- Next meeting: Thursday, May 7, 2026 at
9am
5. Adjournment
Recommendation to IOP City Council
1. Adopt new “healthy beach” definition
• 200 feet of dry sand at highest tide
• Measured from 2018 SCDES baseline or structure line (houses and
pools), whichever is most seaward
• Using the most recent 5-year erosion rates
2. Increase the planned renourishment project volume to 3MM
cubic yards
• Applying that new definition to the 3 critical IOP beach hot spots
requires 546,000 more cubic yards than the 2.5MM permit max.
• Sand will never be as inexpensive as now
• This will cost the city/Wild Dunes an extra $4.1MM
Healthy Beach Goals
Feature Current Method
(cy structure to closure)
New Method
(200 feet of beach)
Primary Goal Protect the house foundation Protect the entire beach and
property line
Tourism Risk of Decline High; leads to “beach-less’
shores. Loss of tourism
revenue
Low; maintains wide, attractive
beaches
Risk of Property Values Erosion leads to property value
decline and flood insurance
issues
Protects entire island
residential property valued at
$6.5 billion
Storm Buffer Fails under extreme pressure Minimize structural damage
Private Assets Pools and yards often lost Homes, pools, and land are
shielded
Emergency Funds ~$4MM+ spending on
emergency measures
Reduced emergency spending
Minimize damage in a level 3 hurricane; ensure a recreational beach at all
tides and seasons, and protect private property and structures.
Healthy Beach – Defined in terms we understand
and can ‘see’
• Beachline: SCDES 2018 baseline or structure line (houses and pools),
whichever is most seaward
• Healthy Beach Definition: 200 feet from Beachline to Mean Highest High
Water Line (MHHW)*
• Renourishment Placement : Sand placement will focus on areas of need,
defined as those areas where:
• There is a sand volume deficit currently, using Healthy Beach Definition,
or
• Where the protective healthy beach width is proposed to be less than
200 feet at the end of the project life
• And the MWWH line* is experiencing erosion
* Consider Arial photography method to overlay the wet line, taken in November and April at higher tide
period, similar to Hilton Head practice.
Renourishment Volumes
• Renourishment Volume = [Current Deficit] + [Advanced Fill] –
[Current Excess]
• Current Deficit: cubic yards of sanded needed to establish 200 feet
between Beachline and MHHW line.
• Advanced Fill: forecast erosion rate (using last 5 years) * project life
(currently using 8 years)
• Current Excess: Excess between current MHHW line and MHHW
line if only 200’ from Beachline
Renourishment Volume Recommendation
• Minimum: use permit max for each of the 3 permitted reaches
• Recommended: additional 546,000 cubic yards (+$4.1MM) using new
healthy beach definition:
• South end: +352,000 cy ($2.6MM)
• Larger deficit using new definition
• 5 year erosion rate thru Feb 2025 (89k cy/yr)
• North end: + 194,000 cy ($1.5 MM)
• Larger deficit using new definition
• 2018-2026 rate for advance fill numbers (150k cy/ft)
• Smooth out / extend Beachwood East area renourishment to 53 rd Ave to
create usable beach.
• Any future changes to volume or locations require town council approval
Permit Vs. Healthy Beach, cubic yards
Permit Maximum Case Recommended Using
Healthy Beach
Definition
Comments
Wild Dunes 1,700,000 1,894,000 +194,000 ($1.5 MM)
Smooth out placement
thru to 53rd Ave.
South End 800,000 1,152,000 +352,000 ($2.6MM)
Total 2,500,000 3,047,000 +546,000 ($4.1MM)
Smooth out Beachwood East Reach
Renourishment
Recommend
extending
renourishment
to limit line to
53rd Ave.
Was erosional
from shoal
attachment
Establishes
usable beach in
interim until
sand from north
attaches.
Risk Analysis
• If south end high recent erosion continues (2022 -2024 period), an
additional 376,000 cubic yards ($2.8MM) would be needed over
recommended volumes
• 136k/yr erosion versus 89k/year 5 year rate assumed
• If only max permit is placed and high erosion case occurs, the 800,000 cubic yards
would erode in 5 1/2 years
• Start groin analysis ASAP
• Army Corp beneficial use volume of 300,000 is fine and known to erode
faster. Recommend sand quality testing to inform erosion rate.
• Shoal attachment doesn’t occur
• Renourishment volume at far end near breach inlet may erode quickly
• Spread out healthy beach volume consistent with bid drawing vs. add more sand
on the end
• Start groin analysis ASAP
Future monitoring: MHHW – mean highest
high water; the higher of the two tides in a day
• Measure in November
and April
• Allow immediate
feedback on
hurricane season
losses
• Capture MHHW ‘wet
line’ on a ~5.5 foot tide
day via arial
photography*
• Memo: October 2025
severe erosion had tide
of 6.8 feet
*Seek expert second opinion on monitoring methodology
Pre-read Materials
150 cy/ft
reflects 2018-
2026 rate
(Source: CSE)
South End Erosion
Long term erosion less relevant as future trend of sand loss expected, per second
opinions
Erosion Rates:
30k/year: Long term erosion
56k/year: Since 2018
70k/year: Permit assumption by CSE
89k/year: 5 year erosion rate (thru 2/25)
136k/year: High erosion period recently
(2022-2024)
Advanced fill ranges:
240,000 (30k/yr)
448,000 (56k/yr)
560,000 (70k/yr)
712,000 (89k/yr)
1,088,000 (136k/yr)
Healthy Beach Deficits using higher of SCDES
Baseline or Structure Line
Healthy Beach = 200’ from “BCM” Red Dash
Healthy Beach = 200’ from “BCM” Red Dash
Healthy Beach = 200’ from “BCM” Red Dash or Blue
Structure, whichever is most seaward
Recommendation: Structure to include houses and pools
Healthy Beach = 200’ from “BCM” Red Dash or Blue
Structure, whichever is most seaward
Recommendation: Structure to include houses and pools
South Beach measurements March 21 (5.8’ tide)
Location Beach: T oe of Dune to
Wet Line
Beach if put dune back Comments
104 Ocean Zero Zero Will lose property at higher tide
100’s (Sand bag area) Almost zero Zero Need dunes re-established. Keep
sand bags for 6’ tides in April
2nd Ave 46 feet 26 feet No dunes. Sandbags. Have lost
private property
3rd Ave 83 feet 63 feet Insufficient dunes.
6th Ave * 50 feet 35 feet Insufficient dunes
7th Ave. * 70 feet 50 feet Insufficient dunes
Grand Pavillion (March
14)
Over 200’ but can see it
has eroded recently
Wild Dunes hot spots Zero Zero Ocean club; Beachwood east
* One month later, there is erosion. 6th and 7th Avenues have same dry
beach distance but on a LOWER tide day of 4.6 ft (vs 5.8 ft tide above).
Emergency cost avoidance ~ $4MM+
• Source is Completed Beach Projects section on IOP town website
Cost - $ Comment
300,000 Beachwood east sand scraping
250,000 Sandbags for south end
unknown Collins Engineering dune restoration, 100 -314 Ocean Blvd
1,250,000 Sand scraping south end
322,000 CSE emergency management oversight
200,000 Sandbags Beachwood East
800,000 Shoal management, Ocean Club, Seascape, Beachwood East
Unknown Private resident spend: extra sand bagging, dune restoration due to
Army Corp delays (~10 families), pool repair costs, vegetation install
$3,122,000-4,000,000 T otal