Agenda
City of Isle of Palms · Charleston County · meeting of Feb 9, 2026 · Agenda packets
Open the original document More from City of Isle of Palms
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Public
Services & Facilities Committee
9:00 a.m., Monday, February 9, 2026
1207 Palm Boulevard
City Hall Council Chambers
Public
Comment:
All citizens who wish to speak during the meeting must email their first and last name, address
and topic to Nicole DeNeane, City Clerk, at nicoled@iop.net no later than 3:00 p.m. the day
before the meeting. Citizens may also provide written public comment here:
https://www.iop.net/public-comment-form
Agenda
1. Call to order and acknowledgment that the press and the public have been
duly not
ified of the meeting in accordance with the Freedom of Information Act.
2. Citizens’ Comments – Al l comments have a time limit of three (3) minutes.
3. Approval of previous meeting’s minutes – Januar y 14, 2026
4. Marina Tenants’ Comments
5. Presentations – none
6. Old Business
a. Update on W
aterway Boulevard project
b. Update on beach projects
c. Review of methodology of determining financial sharing arrangement
d. Discussion of funding options for beach renourishment
e. Discussion and consideration of Agreement with Wild Dunes Community
Association
7. New Business
a. Dis
cussion with Thorn Run Partners – Federal Water Project Authorization
c. Discussion with Philip Slagle, ATM – Marina Dredging Project
d. Review of 10-year capital plan for Public Works Department, Recreation
Department, Drainage, Front Beach, Beach and Marina
8. Miscellaneous Busi ness
9. Adjournment
1
Pu
blic Services & Facilities Committee Meeting
9:00am, Wednesday, January 14, 2026
1207 Palm Boulevard, Isle of Palms, SC and
broadcasted live on YouTube: https://www.youtube.com/user/cityofisleofpalms
MINUTES
1. Call to Order
Present: Council members Miars, Pierce, and Streetman
Staff Present: Administrator Kerr, Deputy Administrator Kuester, Director Pitts, Asst.
Director Asero, Director Ferrell
2. Citizen’s Comments – none
3. Election of Chair and Vice Chair
Council Member Pierce nominated Council Member Miars as Chair of the Public Services &
Facilities Committee. Council Member Miars seconded the nomination. A vote was taken with
all in favor of Council Member Miars as Chair of the Public Services & Facilities Committee.
Council Member Miars nominated Council Member Pierce as Vice Chair of the Public Services
& Facilities Committee. Council Member Pierce seconded the nomination. A vote was taken
with all in favor of Council Member Pierce as Vice Chair of the Public Services & Facilities
Committee.
4. Approval of Previous Meeting’s Minutes – December 2, 2025
MOTION: Council Member Pierce made a motion to approve the minutes as amended.
Council Member Streetman seconded the motion. The motion passed unanimously.
5. Marina Tenant’s Comments
MOTION: Council Member Pierce made a motion to discuss the parking lot update at
this point in the meeting since Mr. Dave Lorenz was in attendance. Council Member
Streetman seconded the motion. The motion passed unanimously.
Committee members discussed the layout agreed upon by the City and the restaurant.
Administrator Kerr pointed out that the cost estimates cannot be more accurate without putting
the project out to bid. At the time of the meeting, the estimated cost of the project is
approximately $500,000 including $50,000 in soft costs.
Mr. Lorenz would like the drive lanes to be of impervious asphalt to prevent constant repairs.
2
Ad
ministrator Kerr said there are two scenarios to consider: “One is if you had a goal, if your
goal was to leave the impervious surfacing at a net zero change, you would remove all of the
existing and the reconfigure that impervious in the circle to have the ring road being out of
asphalt and then all of the material in the middle, the parking spaces, being gravel. If you were to
want to leave the driving surface and then add impervious surfacing to kind of add that ring road
back in, you would be increasing the amount of impervious surfacing and probably triggering
some amount of permitting.”
Mr. Lorenz suggested using the restaurant’s overages to fund the project, allowing the restaurant
to oversee the parking lot renovation. The restaurant would need to bring the final design back to
the Council for final approval. Such a change in responsibility would be a component of the
changes to the lease agreement.
MOTION: Council Member Pierce made a motion to “go forward with the design we talked
about, which is to pull up the asphalt, make the ring, try to, with the objective of going neutral on
the impervious surfacing, and to have Mr. Cline put together a specification to give to Dave, and
for us to take this up to Council and consider up to $500,000 with the hope of saving $50,000 on
the engineering” and to move forward with the redesign of the Marina parking lot and to redo the
lease to reflect the new design and get the City access to the public dock.
Administrator Kerr said, “I think you would want to recommend is recommend to Council that
the City spend up to $500,000 in exchange and to initiate the process of amending the leases.”
Mr. Lorenz will use the approved design to secure pricing.
MOTION: Council Member Pierce made a motion to amend his motion to recommend
to City Council to authorize up to $500,000 to reconfigure the marina lot and to amend the
leases to reflect the new design. Council Member Streetman seconded the motion. The
motion passed unanimously.
6. Presentations – none
7. Old Business
B. Update on Waterway Boulevard Project
Council Member Miars asked if the Waterway Boulevard Multi-Use Path could turn up into the
buffer when complete. Administrator Kerr said there is a requirement for a vegetative buffer, so
he would need to speak to the Zoning Administrator about the matter. He also said there is a lot
of infrastructure in that area which could limit the materials that can be used there. He will report
back his findings to the Committee.
Administrator Kerr reported that since City Council awarded the contract for the project to the
Bastian Group, Quality Enterprises is making plans to appeal the award. The window for that
appeal closes on January 21. A Notice to Proceed will not be issued until the appeal window
closes. If an appeal is filed, the matter will come before City Council. He is seeking legal advice
and will update Council at their January 29 meeting. In the meantime, the Bastian Group will
work on their submittals to Thomas & Hutton.
3
C. Upda
te on beach projects
Council Member Pierce requests that Mr. Traynum update City Council on the situation with US
Fish & Wildlife and the status of the permits. He would also like a “steady forecast on the project
status” and more frequent updates to the public.
Administrator Kerr said staff will do their best to provide updates, but details of the project
change daily. It is a very fluid situation. The best the City can provide are date ranges.
D. Update on MOU with Wild Dunes Community Association
Administrator Kerr reviewed the slides regarding the cost sharing scenarios for the upcoming
beach renourishment project that were discussed with City Council at January 13th’s Special City
Council meeting. He said that establishing cost sharing is the key part of the MOU.
Council Member Pierce would like verification on the legality of spending public monies in
private spaces. Council Member Miars suggested using percentage in the MOU. Administrator
Kerr agreed but added that there will be a cap on what the City will spend.
At their January 29 meeting, City Council will review the alternatives proposals. He reminded
the Committee that there is a $4 million placeholder for hard structures in the FY26 budget. He
said it is appropriate to talk with WDCA about cost sharing such improvements.
Before work can begin on hard structures, Administrator Kerr said the MOU for the upcoming
project needs to be in place, and the City needs to determine if there is a long-term cost benefit of
adding a hard structure to stretch out the renourishment cadence.
Council Member Pierce would like the City to make a formal request to the State and to County
Council for $20 million.
Administrator Kerr stated that the path for those sorts of requests is via SCPRT, and the City has
requested $5.2 million. There is currently not another means by which to make such a request
since earmarks are not permitted. However, the State legislature is reconsidering the earmark
matter.
MOTION: Council Member Miars made a motion to recommend cost sharing scenario 5
to City Council. Council Member Streetman seconded the motion. The motion passed
unanimously.
The cost sharing discussion will be on the February workshop agenda.
8. New Business -- none
4
9. Mis
cellaneous Business
The next regular meeting of the Public Services & Facilities Committee will be Monday,
February 9, 2026 at 9am. Discussion of the draft MOU will be on the agenda.
10. Adjournment
Council Member Miars made a motion to adjourn and Council Member Streetman seconded the
motion. The meeting was adjourned at 10:30am.
Respectfully submitted,
Nicole DeNeane
City Clerk
5
City of Isle of Palms
Analysis of Beach Preservation Fee Fund Contribution Outside of Wild Dunes and Inside of Wild Dunes
2025 County Data
As of December 17, 2025
Category Number of Licenses Gross Revenue Number of Licenses Gross Revenue
Grand Total 817 95,523,764 906 84,246,540 1,723 179,770,304
Total Percentage 47% 53% 53% 47% 100% 100%
Approx 1% of Gross Revenue 955,238 842,465 1,797,703
Notes:
Total gross revenue was derived from Short-Term Rental (STR) licenses as reported in the STR license applications, and from hotels as indicated in the business license applications.
Some short-term rentals report no gross income.
The original 2024 County data listed 56 Wild Dunes properties incorrectly marked as outside of Wild Dunes (983 total properties minus 56 equals 927).
The combined income for these 56 properties is $2,576,897.64
In 2024, the 119 commercial condominiums located outside of Wild Dunes were collectively licensed as two hotels under business licenses.
In 2025, an additional 38 lockout units were identified within Wild Dunes.
Total Number of Licenses and Gross RevenueOutside of Wild Dunes Wild Dunes
6
City of Isle of Palms -Debt Service Scenarios for Beach Renourishment
GO Bond Principal 10,329,315
Terms 5, 7 and 10 Years
1 millage 338,000$
Millage needed per annual debt service 6.82 0.00682 2,303,973 5.09 0.00509 1, 720,963$ 3.81 0.00381 1, 289,410$
Per 1 million taxable value primary residence 4% 1,000,000 272.66$ 203.66$ 152. 59$
Fiscal Year Principal Interest Debt Service Balance Principal Interest Debt Service Balance Principal Interest Debt Service Balance
10,329,315 1,190,551 11,519,865 10,329,315 1, 717,427 12,046,742 10,329,315 2,564,781 12, 894,096
2026 - - - 10,329,315 - - - - - - - -
2027 1,916,624 387,349 2,303,973 8,412,691 - - - 10,329,315 - - - -
2028 1,988,497 315,476 2,303,973 6,424,194 1,307,791 413,173 1, 720,963 9,021,524 - - - 10,329,315
2029 2,063,066 240,907 2,303,973 4,361,128 1,360,102 360,861 1, 720,963 7,661,422 850,414 438, 996 1, 289,410 9,478,901
2030 2,140,431 163,542 2,303,973 2,220,697 1,414,506 306,457 1, 720,963 6,246,916 886,556 402, 853 1, 289,410 8,592,345
2031 2,220,697 83,276 2,303,973 - 1,471,086 249, 877 1, 720,963 4,775,829 924,235 365, 175 1, 289,410 7,668,110
2032 - - - - 1,529,930 191, 033 1, 720,963 3,245,899 963,515 325, 895 1, 289,410 6,704,595
2033 - - - - 1,591,127 129, 836 1, 720,963 1,654,772 1,004,464 284,945 1, 289,410 5,700,130
2034 - - - - 1,654,772 66, 191 1, 720,963 - 1,047,154 242, 256 1, 289,410 4,652,976
2035 - - - - - - - - 1,091,658 197, 751 1, 289,410 3,561,318
2036 - - - - - - - - 1,138,054 151, 356 1, 289,410 2,423,265
2037 - - - - - - - - 1,186,421 102, 989 1, 289,410 1,236,844
2038 - - - - - - - - 1,236,844 52, 566 1, 289,410 -
2039 - - - - - - - - - - - -
2040 - - - - - - - - - - - -
Description Description WD Large Offshore MOB / DEMOB Description Wild Dunes Offshore Description Wild Dunes Offshore
Net City Funding Amount Net City Funding Amount 10,329,315 Net City Funding Amount 10,329,315 Net City Funding Amount 10,329,315
Term Term 5 Term 7 T erm 10
Principal Deferral Principal Deferral - Principal Deferral - Principal Deferral -
Rate Rate 3.75% Rate 4.00% Rate 4.25%
Timing (FY) Timing (FY) 2026 Timing (FY) 2027 Timing (FY) 2028
Structure Structure Level D/S Structure Level D/S Structure Level D/S
Funding Type Funding Type G.O. Funding Type G.O. Funding Type G.O.
On/Off On/Off On On/Off On On/Off On
Debt Debt Debt Debt Debt Debt Debt
Note: Each scenario begins in a different year for illustration purposes only.
10 Years @ 4.25%5 Years @ 3.75% 7 Years @ 4.00%
7
City of Isle of Palms -Debt Service Scenarios for Beach Renourishment
GO Bond Principal 5,494,316
Terms 5, 7 and 10 Years
1 millage 338,000$
Millage needed per annual debt service 3.63 0.00363 1,225,518 2.71 0.00271 915,406$ 2.03 0.00203 685,856$
Per 1 million taxable value primary residence 4% 1,000,000 145.03$ 108.33$ 81.17$
Fiscal Year Principal Interest Debt Service Balance Principal Interest Debt Service Balance Principal Interest Debt Service Balance
5,494,316 633,272 6,127,588 5,494,316 913,525 6,407,841 5,494,316 1,364,245 6,858,562
2026 - - - 5,494,316 - - - - - - - -
2027 1,019,481 206,037 1,225,518 4,474,836 - - - 5,494,316 - - - -
2028 1,057,711 167,806 1,225,518 3,417,124 695,633 219,773 915,406 4,798,683 - - - 5,494,316
2029 1,097,375 128,142 1,225,518 2,319,749 723,459 191,947 915,406 4,075,224 452,348 233,508 685,856 5,041,969
2030 1,138,527 86,991 1,225,518 1,181,222 752,397 163,009 915,406 3,322,828 471,573 214,284 685,856 4,570,396
2031 1,181,222 44,296 1,225,518 - 782,493 132,913 915,406 2,540,335 491,614 194,242 685,856 4,078,782
2032 - - - - 813,793 101,613 915,406 1,726,542 512,508 173,348 685,856 3,566,274
2033 - - - - 846,344 69,062 915,406 880,198 534,290 151,567 685,856 3,031,984
2034 - - - - 880,198 35,208 915,406 - 556,997 128,859 685,856 2,474,987
2035 - - - - - - - - 580,669 105,187 685,856 1,894,318
2036 - - - - - - - - 605,348 80,509 685,856 1,288,971
2037 - - - - - - - - 631,075 54,781 685,856 657,896
2038 - - - - - - - - 657,896 27,961 685,856 -
2039 - - - - - - - - - - - -
2040 - - - - - - - - - - - -
Description Description WD Large Offshore MOB / DEMOB Description Wild Dunes Offshore Description Wild Dunes Offshore
Net City Funding Amount Net City Funding Amount 5,494,316 Net City Funding Amount 5,494,316 Net City Funding Amount 5,494,316
Term Term 5 Term 7 Term 10
Principal Deferral Principal Deferral - Principal Deferral - Principal Deferral -
Rate Rate 3.75% Rate 4.00% Rate 4.25%
Timing (FY) Timing (FY) 2026 Timing (FY) 2027 Timing (FY) 2028
Structure Structure Level D/S Structure Level D/S Structure Level D/S
Funding Type Funding Type G.O. Funding Type G.O. Funding Type G.O.
On/Off On/Off On On/Off On On/Off On
Debt Debt Debt Debt Debt Debt Debt
Note: Each scenario begins in a different year for illustration purposes only.
10 Years @ 4.25%5 Years @ 3.75% 7 Years @ 4.00%
8
Page 1
CITY OF ISLE OF PALMS, SOUTH CAROLINA
General Obligation Bond, Series 2026
(20-Day Challenge Period)
FINANCING SCHEDULE
DATE TASK RESPONSIBILITY
By February 6 Distribute Draft of Bond Ordinance BC
February 9 Distribute Draft of Bank RFP FA
By February 11 Comments Due on Bond Ordinance / Bank RFP Working Group
By February 13 Finalize Bond Ordinance BC
February 24 City Council Meeting – First Reading of Bond Ordinance City / BC
March 2 Send Bank RFP to Bidders FA
By March 16 Publish Summary NOS (Post & Courier) BC / FA
March 23 Bank Bids Due
Call to Review Bank Bids Working Group
March 24 City Council Meeting – Second Reading of Bond Ordinance City / BC
By March 27 Publish Notice of Enactment of Ordinance (20 -day challenge period) City / BC
Week of April 6 Distribute Draft of Closing Documents BC
April 16 20-Day Challenge Period Ends BC
April 21 Closing Working Group
*City Council typically meets the 4th Tuesday of each month.
RESPONSIBILITY LEGEND:
Role Entity Defined
Issuer City of Isle of Palms, South Carolina “City”
Bond Counsel TBD “BC”
Financial Advisor First Tryon Advisors “FA”
Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa
1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4
8 9 10 11 12 13 14 8 9 10 11 12 13 14 5 6 7 8 9 10 11
15 16 17 18 19 20 21 15 16 17 18 19 20 21 12 13 14 15 16 17 18
22 23 24 25 26 27 28 22 23 24 25 26 27 28 19 20 21 22 23 24 25
29 30 31 26 27 28 29 30
Feb-26 Mar-26 Apr-26
9
Page 1
CITY OF ISLE OF PALMS, SOUTH CAROLINA
General Obligation Bond, Series 2026
(60-Day Challenge Period)
FINANCING SCHEDULE
DATE TASK RESPONSIBILITY
By February 6 Distribute Draft of Bond Ordinance BC
February 9 Distribute Draft of Bank RFP FA
By February 11 Comments Due on Bond Ordinance / Bank RFP Working Group
By February 13 Finalize Bond Ordinance BC
February 24 City Council Meeting – First Reading of Bond Ordinance City / BC
March 3 City Council Special Meeting – Second Reading of Bond Ordinance City / BC
March 18 Send Bank RFP to Bidders FA
By April 1 Publish Summary NOS (Post & Courier) BC / FA
April 8 Bank Bids Due
Call to Review Bank Bids Working Group
Week of April 20 Distribute Draft of Closing Documents BC
May 2 60-Day Challenge Period Ends BC
May 5 Closing Working Group
*City Council typically meets the 4th Tuesday of each month.
RESPONSIBILITY LEGEND:
Role Entity Defined
Issuer City of Isle of Palms, South Carolina “City”
Bond Counsel TBD “BC”
Financial Advisor First Tryon Advisors “FA”
Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa
1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 1 2
8 9 10 11 12 13 14 8 9 10 11 12 13 14 5 6 7 8 9 10 11 3 4 5 6 7 8 9
15 16 17 18 19 20 21 15 16 17 18 19 20 21 12 13 14 15 16 17 18 10 11 12 13 14 15 16
22 23 24 25 26 27 28 22 23 24 25 26 27 28 19 20 21 22 23 24 25 17 18 19 20 21 22 23
29 30 31 26 27 28 29 30 24/31 25 26 27 28 29 30
May-26Feb-26 Mar-26 Apr-26
10
STATE OF SOUTH CAROLINA ) AGREEMENT RELATED TO BEACH
) RESTORATION ACTIVITIES FOR
COUNTY OF CHARLESTON ) IOP NORTH AND SOUTH END OF ISLAND
This AGREEMENT (“Agreement”) is made and entered into this ____ day of February
2026 by and the City of Isle of Palms, S.C., a South Carolina municipal corporation ( the “City”)
and the Wild Dunes Community Association, Inc. (the “Association”), a South Carolina nonprofit
corporation, collectively referred to as “the Parties.”
WHEREAS, the City completed large -scale beach renourishment project s in 2008 and
2018 as well as subsequent erosion mitigation activities to address the severe beach erosion caused
primarily by the natural processes of major storms (Matthew (2016) and Irma (2017)), and a shoal
attachment at the northeastern end of the Isle of Palms (the “Island”); and
WHEREAS, despite these efforts, severe erosion has continued in certain localized hotspot
erosional areas due to the ongoing natural processes and dynamic inlet conditions on the north and
south ends of the Island; and
WHEREAS, the added impacts of severe beach erosion from Hurricane s Dorian in 2019,
Hanna in 2020, and Erin in 2025, and sea level rise have resulted in public and private emergencies
which affect the health and safety of the public and private property owners in the affected areas ,
as well as access for the public; and
WHEREAS, it has been determined and agreed to by all parties that the best course of
action presently available to address these emergencies is an offshore dredging project to pump
beach-compatible sand from the floor of the Atlantic Ocean to the eroded beach areas (the
“Restoration Project”); and
WHEREAS, the Association and its members collectively ha ve valuable real property
interests that are or are expected to be subjected to imminent peril as a result of the erosion caused
by the process of the shoal attachment on the northern end of the Island, and the impacts of recent
hurricanes, and desire that the City undertake the Restoration Project and are willing to assist the
City in the performance of the Project , to grant easements to the City and its contractors if
necessary for the Project, and to protect the City in certain financial respects; and
WHEREAS, the City derives a public benefit from the private property and public beaches
in the affected areas through the generation of real property taxes, accommodation and hospitality
fees, the public’s use and enjoyment of the beaches, and the preservation of the City’s and the
State of South Carolina’s tourism industry; and
WHEREAS, the City desires to protect the health and safety of the public by trying to
prevent infrastructure, sewer, and construction debris from being swept into the waters
surrounding the City; and
11
WHEREAS, as a condition of the issuance of any state or federal permitting for the
Restoration Project, all sandbags, previously placed in the affected areas by the City or
Association’s members, or others, must be removed by the entity who placed them, prior to the
project’s start, and all non-beach-compatible sand contained in any such bags must be removed
from the beach and disposed of in a proper manner; and
W
HEREAS, the City has funded and coordinated the work necessary for the issuance of
the appropriate state and federal agency permits (the “Permits”) to conduct the Restoration Project,
and issuance of the Permits should occur soon.
NOW
THEREFORE, in consideration of the premises and the mutual covenants and
promises of the Parties hereto set forth in this Agreement, the Parties agree as follows:
1. C
ITY’S WORK.
A. F
or purposes of this Agreement, the “City’s Work” is defined as all activities allowed
or required by the Permits for the Restoration Project within the vicinity of the beach
within Reaches One and Two as depicted in Coastal Science Engineering (“the
Engineer”) plans dated February _____, 2026 (the “ Plans”) and attached herein as
Exhibit 1, except as otherwise stated in this Agreement , including, but not limited to,
off-shore dredging activities , all monitoring required by the Permits , all sand tilling
required by the Permits, depositing dredged sand, and sea turtle protection and
monitoring activities required by the Permits.
B. C. F
or purposes of this Agreement, the City’s Work does not include any work outside
of Reaches One and Two. The City is working separately on Reach Three, but that
work is excluded from this Agreement and no funds from the Association will be used
for any work associated with Reach Three. (See sheet six of the Plans.)
C. F
or purposes of this A greement, the City’s Work does not include the removal of
sandbags placed by the City and some of the Association’s members. This removal
must happen as a condition of prior Emergency Orders issued to the City and because
this condition predates this agreement, no funds from the Association will be used for
the removal of sandbags.
D. T
he City’s Work does not include any inspections, engineering, repairs, or other costs
regarding the condition, safety, or structural integrity of any building, either before,
during, or after completion of the City’s Work.
E. T
he City’s Work does not include the removal or disposal of any building debris,
including, but not limited to, concrete, wood, glass, sheetrock, or pipes, which is
located on or near the active beach.
12
2. ESTIMATED COSTS FOR THE CITY’S WORK.
A. T
he cost for the City’s Work under this Agreement is estimated by the City to be
Twenty-Two Million and no/100 ($22,000,000.00) Dollars. This is an estimate and the
actual amount will fluctuate based on receiving bids on sand placement. The City’s
Work costs include but are not limited to all fees and costs incurred by City associated
with: any additional permitting; dredging; engineering; consultants; legal; sand ti lling
required by the Permits; sea turtle protection and monitoring activities required by the
Permits; and all other fees and costs incurred by the City in order to comply with the
Permits and complete the City’s Work.
B. The
City’s contribution may be reduced by contributions toward the costs of the City’s
Work made by any other state, federal or local political subdivision. Such outside
contributions would not reduce the Association’s Contribution.
C. T
he City shall not perform or complete the City’s Work under the Permits unless and
until the balance of the costs for the City’s Work has been funded by the City’s
Contribution, the Association’s Contribution, and state / federal sources; provided,
however, that if both parties agree in writing, the City may execute a smaller -scale
restoration project for less than the estimated cost referenced in Section 4(A) above if
required by the Permits or if the City is unable to secure funding for the remaining
balance of the costs from the Association, state and/or federal sources.
D. T
he City agrees to maintain separate accounting records for the City’s Work. All
records of the City’s Work shall be available for inspection by the Association at all
reasonable times.
3. C
OST SHARING.
A. B
asis. The basis for the cost sharing between the City and T he Association is the
percentage of funds generated on the Island from Accommodations Tax es which in
part, funds the City’s Beach Preservation Fund. The Parties agree that this percentage
in 2025 was 47% from the Association and 53% from the City.
B. S
haring Percentages. In recognition of these contributions, the City will fund 47% of
the total construction cost of the City’s Work under this agreement, not exceeding Ten
Million and five-hundred thousand no/100 ( $10,500,000.00) Dollars (the “City’s
Contribution”). The Association will fund 53% of the total construction cost of northern
portion of the project, not exceeding Twelve Million and no/100 ($12,000,000.00)
Dollars (the “Association’s Contribution”).
C. A
dditional Costs. The Association agrees to share in all additional costs related to the
City’s Work under this agreement including but not limited to mobilization, sand
placement, construction administration services, wildlife monitoring services ,
consulting, professional services, and other related expenses using the same calculation
as described in Section 1(B). of this Agreement.
13
D. City Exclusive Costs . The City will fund 100% of all project costs in Reach 3 at the
southern end of the Island, which is excluded from this Agreement.
4. ESCROW DEPOSIT TOWARD COSTS OF THE RESTORATION PROJECT.
A. Association’s Contribution. The Association agrees to deposit the full amount of the
Association’s Contribution in escrow with the City no later than 30 days from the date
of receiving bids . TIME IS OF THE ESSENCE. This amount shall be placed in an
interest-bearing bank account, and all accrued interest shall be credited to the
Association’s Contribution.
B. Replenishment of Escrow Account . If at any time both parties agree in writing to
expand the scope or scale of the Restoration P roject and the amounts dictated by this
agreement are insufficient, the City shall provide a written amendment to this
Agreement and the Association agrees to replenish the escrow account with enough
money to restore the deficit within thirty (30) days from the date of City’s written notice
(the “Replenishment Deposit”). TIME IS OF THE ESSENCE.
C. Refund upon failure to make Initial Deposit or Replenishment Deposit. If the
Association fails to make the initial escrow deposit of the Association’s Contribution
as set forth in paragraph (A) of this Section or any subsequent Replenishment Deposits
as set forth in paragraph (B) of this Section, then the City has the right to terminate the
City’s Work without further notice and withdraw its application for the Permits or, if
issued, surrender or transfer the Permits. In such case, the balance of the escrow
deposit, if any, will be refunded to the Association ninety (90) days after all fees and
costs already incurred in connection with the City’s effort to execute the City’s Work
pursuant to this Agreement have been satisfied.
5. REFUND OF REMAINING BALANCE UPON COMPLETION OF RESTORATION
PROJECT. If a refund is requested in writing by the Association within one (1) year after
the completion date of the initial Restoration Project, t he remaining balance of the
Association’s Contribution, if any, after all fees and costs incurred in connection with the
Restoration Project have been satisfied, shall be refunded to the Association ninety (90)
days after receipt of the written request . If all fees and costs incurred in connection with
the Restoration Project have not been satisfied at the time of Association’s written request,
such refund shall be made ninety (90) days after satisfaction of the outstanding fees and
costs. If the Association fails to make a written request within one (1) year after the
completion date of the initial Restoration Project, the remaining balance of the
Association’s Contribution shall remain in the City’s escrow account and be subsequently
transferred to the City’s Beach Preservation Fund and used in a manner that is in keeping
with this funds purpose.
6. TIME PERIOD FOR COMPLETION OF RESTORATION PROJECT. The time period
for completion of the Restoration Project shall be set forth in the Permits or any extensions
14
or amendments thereto. If the City is unable, for any reason whatsoever, to perform or
complete the Restoration Project by the expiration date of the Permits or any extensions or
amendments thereto, the balance of the Association’s Contribution remaining in escrow, if
any, will be refunded to the Association ninety (90) days after all fees and costs incurred
in connection with the City’s effort to execute the City’s Work prior to such expiration date
have been satisfied, unless otherwise requested in writing by the Association.
7. CONSTRUCTION AND RESTORATION EASEMENTS.
A. The Association hereby grants to the City a temporary, general easement on, over and
across real property owned or controlled by the Association adjacent to the Property
Owners Beach House, to provide City and City’s contractors, subcontractors,
consultants, engineers, advisers, inspectors, employees and agents access to the fullest
extent required by the City to complete the City’s Work under the Permits including
but not limited to ingress and egress, construction staging areas, Erosion Mitigation
Activity areas, and access to water and electricity. If required or requested by the City,
the Association agrees to grant the City a formal written easement for such activities
which will be recorded in the Charleston County Register of Deeds Office.
B. The Association agrees to secure permanent easements from the owners adjacent and
abutting to the City’s Work prior to the commencement of the restoration project.
8. ADMINISTRATION OF THE CITY’S WORK. The City shall have sole authority and
control over the City’s Work under the Permits. The City, in consultation with its advisers,
will negotiate and enter into all contracts which will delineate the exact scope and detail of
the City’s Work under the Permits.
9. PERMIT APPLICATIONS.
A. Permits. Necessary Permits have been applied for and are nearing issuance prior to the
execution of this Agreement.
B. Additional Permits. Additional Permits are not anticipated and not addressed herein.
10. ACKNOWLEDGEMENT OF RISKS; RELEASE AND INDEMNIFICATION OF THE
CITY.
A. The Association understands and agree s that, due to the nature of the dynamics of
storms, winds, currents and tides of the Atlantic Ocean, and the current severity of the
erosion, there is no promise or guarantee from the City or any other person that the
City’s Work under the Permits will be successful in alleviating or eliminating erosion;
continued, severe erosion may continue to occur because of natural causes during and
after the administration of the Restoration Project per the Permits; a substantial portion
or all of the sand placed on the beaches as part of the Restoration Project could be
washed away by a major storm event or tide; and that the City’s Work under the Permits
and/or Additional Permits may be delayed , postponed or canceled because of
15
permitting requirements, insufficient funding, acts of God, labor shortages, labor
strikes, material shortages, or other factors beyond the reasonable control of City.
B. The Association understands and agrees that any risk to the structural integrity of any
building caused by the removal of erosion control measures, including, but not limited
to, wave dissipation devices and sandbags, shall be borne by the owner of the affected
building. The Association hereby releases the City and its officials, agents, employees,
inspectors or advisers from any and all claims against City for property damage caused
by the removal of such erosion control measures.
C. The Association hereby releases the City and its officials, agents, employees, inspectors
or advisers from any and all claims against City for property damage caused by erosion
or the failure of the City’s Work under the Permits to alleviate, eliminate or delay the
erosion of Association its members’ property. This release does not extend to any
claims against the dredging contractor(s), the contractor(s) performing Erosion
Mitigation Activities, or the engineer engaged by City in performance of the City’s
Work under the Permits.
D. The Association hereby agree s to hold harmless and indemnify the City, its officials,
agents, employees, inspectors or advis ers against any loss or damage, including
reasonable attorney’s fees and expenses, incurred as a result of any claims against the
City or its officials, agents, employees, inspectors or advisors for personal injury or
property damages in connection with the City’s Work under the Permits except to the
extent that such loss is caused by any negligent or reckless act of the City or its officials,
agents, employees, inspectors or advisers. This indemnification does not extend to any
claims against the dredging contractor(s), the contractor(s) performing Erosion
Mitigation Activities, or the engineer engaged by City in performance of City’s Work.
11. NOTICES. All notices, consents, approvals and requests required by any provision of this
Agreement shall be in writing and shall be deemed to be properly given and received when
personally delivered to the representatives of each party or when deposited in the United
States mail, registered or certified, with return receipt requested, postage prepaid. All
notices to the City of Isle of Palms shall be addressed to Mr. Douglas Kerr, City
Administrator, 1207 Palm Blvd., Isle of Palms, SC 29451. N otices to any other party to
this Agreement shall be mailed to the address on record with Charleston County or at such
other address as the party may hereafter designate in writing to the City.
12. MISCELLANEOUS PROVISIONS.
A. Binding Agreement. The parties hereto respectively bind themselves and their
successors and assigns with respect to all covenants, agreements and obligations
contained in this Agreement. Any party may assign its rights under this Agreement
upon written notice to all other parties of such assignment.
B. Governing Law. This Agreement shall be construed according to and governed for all
purposes by the law of the State of South Carolina.
16
C. No Joint Venture. This Agreement is not to be construed as creating, nor does it create,
a joint venture or partnership between the parties for any purpose, or authorizing any
party to act as agent for another party.
D. Entire Agreement. This Agreement constitutes the entire agreement between the parties
hereto. Any amendments hereto shall be in writing and signed by all parties hereto.
E. Multiple Counterparts. This Agreement may be executed in any number of counterparts
with the same effect as if all the signing parties had signed the same document. All
counterparts shall be construed together and constitute the same instrument.
IN WITNESS WHEREOF, the parties hereto have hereunto set their hands and seals, by
and through the undersigned agents, as of the date stated above.
WITNESS:
_________________________ The City of Isle of Palms, SC
_________________________ By: ____________________________
Title: __________________________
_________________________
_________________________ Wild Dunes Community Association, Inc.
_________________________
By: ____________________________
Title: __________________________
17
EXHIBIT 1
(ATTACH ENGINEER’S PLANS DATED FEBRUARY ___, 2026)
18
1
2
3
4
5
6
7
8
9
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
C D E F I J K L M N O P Q R S
City of Isle of Palms, SC
Capital Planning Model
Capital Improvement Plan
New, Major Changes, Deferred from FY26
1 2 3 4 7 8 9 10 11 12 13 14 15 16 17
On/Off Description Funding Type Fund 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Off
On General Government
On Audio Visual (AV) improvements for Council Chamber Cash Capital Projects Fund 50,000
On City Hall parking lot fence replacement Cash Capital Projects Fund
On Replace framing and metal doors at City Hall Cash Capital Projects Fund 40,000
On Elevator equipment modernization Capital Projects Fund 70,000
On City Hall generator Cash Capital Projects Fund 75,000
On Court software replacement Cash State Accommodations Tax Fund -
On Message boards at Connector and Breach Inlet Cash State Accommodations Tax Fund
On Admin & Mayor's radios as needed Cash Capital Projects Fund - 20,000
On FEMA Flood Mitigation project on Forest Trail, fully offset by grant funds.
Deferred 325,200 of the 625,000 from FY24. Cash Capital Projects Fund 100,000
On Resurface City Hall parking lot Cash Capital Projects Fund 30,000
On Reconfigure Upstairs Conference Room to add Office Space Cash Capital Projects Fund 50,000
On Planning, design & construction for City Hall repair and reconfiguration.
Assumes debt for $4M in FY2X. Cash Capital Projects Fund
Off 150,000 110,000 - 50,000 125,000 - - - - - -
On Public Works Department
On 2006 Mack Packer (PW2) Rear Loader (18m LT) (Letter of Intent FY24) (Moved
from FY25 to FY26 & $250K to $320K) Cash Capital Projects Fund 106,667
On 2006 Mack Packer (PW2) Rear Loader (18m LT) (Letter of Intent FY24) (Moved
from FY25 to FY26 & $250K to $320K) Cash Hospitality Tax Fund 106,667
On 2006 Mack Packer (PW2) Rear Loader (18m LT) (Letter of Intent FY24) (Moved
from FY25 to FY26 & $250K to $320K) Cash State Accommodations Tax Fund 106,666
On 2008 Mack Packer (PW22) Side Loader (18m LT) (Letter of Intent FY24)($255K
to $390K) Cash Capital Projects Fund 430,000
On 2009 Mack w/ 31yd Loadmaster Packer (PW24) Replace w/ sideloader Cash State Accommodations Tax Fund 435,000
On 2014 Mack w/ 30yd Packer (PW26) Cash Municipal Accommodations Fee Fund 440,000 -
On 2016 Mack w/ 30yd Packer (PW16) Cash Capital Projects Fund 480,000
On 2018 Mack w/ 30yd Packer (PW27) (~ FY33) Cash State Accommodations Tax Fund 510,000
On 2006 Caterpillar trash loader (keep the old one as reserve) Cash Municipal Accommodations Fee Fund
On 2021 Mack Flatbed (PW 21) (~ FY36) Cash Capital Projects Fund 100,000
On 2018 Mack Flatbed (PW 28) Cash State Accommodations Tax Fund 90,000
On 2022 Chevy 3500 Diesel to trailor jet VAC Cash Municipal Accommodations Fee Fund 70,000
On 2014 F150 4x4 Cash State Accommodations Tax Fund
On Ford F150 (Public Works Director) (Decreased by $10K) Cash Municipal Accommodations Fee Fund 50,000
On Hopper for 2016 Ford F350 Cash Hospitality Tax Fund 68,000
On 2017 Ford F-250 w/ Hopper Cash Capital Projects Fund 55,000
On 2019 Dodge Ram 1500 4x4 (PW-30) Cash Capital Projects Fund 37,000 39,000
On 2019 Dodge Ram 1500 4x4 w/ 6 ft bed (PW-29) Cash State Accommodations Tax Fund 37,000
On Radios Cash Capital Projects Fund 20,000
On Four 4-in flood water pumps as needed Cash Municipal Accommodations Fee Fund 20,000 20,000
On Z-track mower for rights of way Cash Municipal Accommodations Fee Fund 20,000
On Skid Steer purchased in FY16 - Deferred from FY25 to FY26 Cash State Accommodations Tax Fund 60,000
On Purchase surveying equipment for in-house drainage maintenance Cash Capital Projects Fund
On Provision for relocation or improvements to Front Beach Compactor Cash Hospitality Tax Fund
On Jet Vac trailer for stormwater maintenance Cash Municipal Accommodations Fee Fund 60,000
On Front beach trash compactor purchased in FY15 Cash State Accommodations Tax Fund 60,000
On Fuel Dispensers Cash Capital Projects Fund 20,000
On
Provision to move electric lines underground. Dominion Energy matches the
City's 50% contribution (Moved from FY24 to FY25) 14th Ave in FY25 and 41st
Ave in FY26 Cash Municipal Accommodations Fee Fund 131,000
On Rehab golf cart path along Palm Blvd connecting 18th and 20th Ave Cash State Accommodations Tax Fund 50,000
Off 96 Gallon Carts (transition 4,500 carts over 3 years for new side loader) Cash General Fund 100,000 100,000
On Building Maintainence Contingency - Calculated as 1% of Public Works Building
insured value including HVAC system. INCR TO 2% IN FY27 Cash Capital Projects Fund
On General drainage contingency for small projects Cash Capital Projects Fund 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000
On Annual drainage for comprehensive plan Cash Capital Projects Fund 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000
On Design & permitting for next drainage project (Myrtle & 19th) Cash Capital Projects Fund 100,000
On Drainage improvement on Palm Blvd between 38th and 41st
Funded by $1M state budget allocation Cash Capital Projects Fund 1,850,000 2,200,000 3,000,000
On Repeat drainage work based on 3-year maintenance rotation Cash Municipal Accommodations Fee Fund 198,668 198,668 198,668 198,668 198,668 198,668 198,668 198,668 198,668 198,668
On Phase 3 - Waterway Blvd Multi-use path elevation. City is seeking grant funds to
offset this cost. Cash Capital Projects Fund 1,480,000 1,700,000
19
1
2
3
4
5
6
7
8
9
C D E F I J K L M N O P Q R S
City of Isle of Palms, SC
Capital Planning Model
Capital Improvement Plan
New, Major Changes, Deferred from FY26
1 2 3 4 7 8 9 10 11 12 13 14 15 16 17
On/Off Description Funding Type Fund 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
On Phase 3 - Waterway Blvd Multi-use path elevation. City is seeking grant funds to
offset this cost. Cash State Accommodations Tax Fund 520,000
Off 4,807,668 5,175,668 4,080,668 1,008,668 718,668 618,668 1,098,668 703,668 1,058,668 637,668 -
On Building Department
On 2018 Chevy pickup truck Cash Capital Projects Fund 45,000 40,000
Off - 45,000 - - - - - - - 40,000 -
On Recreation Department
On Playground Equipment 5-12 Big Toy & 2-5 year old Toddler Toy and pour & play
surfacing. (Scoreboard -only with failure FY26+) Cash State Accommodations Tax Fund 20,000 20,000 20,500 21,500 22,500 23,500 24,500 25,500 26,500 27,000 27,500
On Basketball scoreboard in gymnasium Cash State Accommodations Tax Fund
On Upgrade IT & Video Conference System in Magnolia/Palmetto rooms for better
livestreaming Cash Capital Projects Fund 60,000 -
On Acoustical Panels for Gymnasium Cash State Accommodations Tax Fund
On Recreation -1 SUV Cash Municipal Accommodations Fee Fund 48,000
On Toro Groomer Cash Capital Projects Fund 20,000
On Golf Cart Cash Hospitality Tax Fund 12,500 14,000
On Computer server for security cameras Cash Capital Projects Fund 8,000 10,000
On 2018 Ford F-150 Cash Municipal Accommodations Fee Fund 48,000
On Bi-Parting walk-draw curtain in Gym Cash Capital Projects Fund 15,000
On Soccer Goals Cash Municipal Accommodations Fee Fund 8,000 9,000
On Construct sand volley ball court Cash Capital Projects Fund - 28,000
On Lift for changing ceiling lights and tiles ($12K to $15K) Cash Capital Projects Fund 15,000
On Floor Scrubber (new model better for sanitizing) Cash Capital Projects Fund - 9,000 10,000
On Lights on soccer field (installed FY17 w/ 25yr warranty) Cash State Accommodations Tax Fund
On Interior basketball goals with retractable system (FY40) Cash State Accommodations Tax Fund
On John Deere Z-TRAK mower Cash State Accommodations Tax Fund - 15,000 - 16,000
On Tennis Fencing (~ every 10 years) Cash Hospitality Tax Fund 30,000
On Covered walkway to front entrance Cash Capital Projects Fund
On Christmas Tree for Front Beach area Cash Capital Projects Fund 22,000
On Fencing on Softball Field Cash Municipal Accommodations Fee Fund 50,000
On Fencing on Soccer Field Cash Capital Projects Fund 8,000
On Fencing on Baseball Field Cash Municipal Accommodations Fee Fund - 25,000
On Dog Park fencing and play equipment Cash Municipal Accommodations Fee Fund
On John Deere Tractor Cash State Accommodations Tax Fund 25,000
On 4 outdoor basketball goals and posts Cash State Accommodations Tax Fund 22,000 30,000
On Picnic Shelter design & contruction Cash State Accommodations Tax Fund 92,000
On Baseball, softball, tennis & basketball lights (FY37) Cash State Accommodations Tax Fund
On Ground & exterior building lights Cash Municipal Accommodations Fee Fund 25,000
On Construct fitness room expansion Cash Municipal Accommodations Fee Fund 675,000
On Equipment for fitness room expansion Cash Municipal Accommodations Fee Fund 120,000
On Construct outdoor fitness court Cash Municipal Accommodations Fee Fund
On Reconstruct 2 Tennis Courts Cash Municipal Accommodations Fee Fund 65,000
On Reconstruct 2 Tennis Courts Cash State Accommodations Tax Fund 65,000
On Reconstruct 2 Tennis Courts Cash Recreation Building Fund 60,000
On Resurface Tennis Courts Cash Capital Projects Fund 25,000
On Reconstruct and reconfigure Outdoor Basketball Courts Cash Municipal Accommodations Fee Fund 25,000
On Resurface pickleball courts Cash Hospitality Tax Fund 10,000
On Lighting for pickleball courts (moved from FY24 to FY25) Cash Hospitality Tax Fund
On Covered trailer for events Cash State Accommodations Tax Fund
On Flooring High Tide Cash Capital Projects Fund 30,000
On Flooring office and lobby Cash Capital Projects Fund 20,000
On Resurface Parking Lot Cash Capital Projects Fund 150,000 -
On Rehabilitate softball, baseball and multipurpose fields (FY30+) Cash Capital Projects Fund 100,000
On Construct gymnasium in accordance with Master Plan Cash Municipal Accommodations Fee Fund
On Hallway and Lobby Lights Cash Hospitality Tax Fund 12,000
On Roof repairs/replacement Cash Capital Projects Fund 150,000
On Gymnasium Flooring Cash State Accommodations Tax Fund 85,000
On Gymnasium Restroom Renovation Cash Capital Projects Fund 25,000
On 288,000 369,000 137,500 242,000 172,500 227,500 112,500 110,500 26,500 42,000 822,500
On Front Beach Area, including Public Restrooms, Parking Meters and Parking Lots Cash Hospitality Tax Fund
On
Parking Meter kiosks (5 total kiosks to supplement mobile payments).
Remainder of old kiosks will be removed from service when they become too
expensive to maintain. Move to Text2Park sys. Cash Hospitality Tax Fund 20,000
20
1
2
3
4
5
6
7
8
9
C D E F I J K L M N O P Q R S
City of Isle of Palms, SC
Capital Planning Model
Capital Improvement Plan
New, Major Changes, Deferred from FY26
1 2 3 4 7 8 9 10 11 12 13 14 15 16 17
On/Off Description Funding Type Fund 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
On New benches in the Front Beach area Cash State Accommodations Tax Fund 25,000
On Replace Front Beach irrigation system & repair associated infrastructure Cash State Accommodations Tax Fund 175,000
On Add, replace or rehabilitate public art Cash Capital Projects Fund 10,000 10,000
On Resurface City-owned portion of Ocean Blvd Cash State Accommodations Tax Fund 100,000
On Repair sidewalks on Ocean Blvd between 10th and 14th Cash State Accommodations Tax Fund 70,000 70,000
On Assign Fund Balance for Future Expenditures Cash Municipal Accommodations Fee Fund 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000
On Assign Fund Balance for Future Expenditures Cash Hospitality Tax Fund 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000
On Assign Fund Balance for Future Expenditures Cash State Accommodations Tax Fund 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000
Off 95,000 255,000 75,000 75,000 95,000 250,000 85,000 75,000 75,000 75,000 75,000
On Breach Inlet Boat Ramp
On Rehabilitate concrete ramp (last done in FY00) Cash Capital Projects Fund 75,000
Off - - 75,000 - - - - - - - -
On Beach Maintenance, Monitoring and Access Beach Preservation Fee Fund
Off Repl/repair/add dune walkovers (approx. 57 accesses)(Funded by FY24 State
budget allocation (SCPRT) of $500K) Cash Beach Preservation Fee Fund 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000
Off Nourishment permitting including up to $100K for additional borings for borrow area Cash Beach Preservation Fee Fund 300,000
On Improve emergency vehicular access at IOP County Park (Moved from FY24 to
FY25) Cash Beach Preservation Fee Fund
Off Mobi Mat/Access Rec material for beach accesses as needed Cash Beach Preservation Fee Fund 35,000 15,000 35,000 15,000 35,000 15,000 35,000 15,000 35,000 35,000 15,000
On Design & permitting related to next large scale off-shore project (Moved from
FY24 to F25 & $225K to $365K) Cash Beach Preservation Fee Fund 575,000 450,000 600,000
On Feasibility Study - Breach Inlet Project Cash Beach Preservation Fee Fund
Off USACE Breach Inlet Project (Construction start March 2024) Cash Beach Preservation Fee Fund 20,000
On Construction of next large scale project Breach Inlet Cash Beach Preservation Fee Fund 10,943,167
On Construction of next large scale project Wild Dunes (rough estimate of City's
contribution - 25%, cost shared with WDCA) Cash Beach Preservation Fee Fund 8,550,698
Off Groin permitting Cash Beach Preservation Fee Fund 150,000
On Groins Cash Capital Projects Fund 4,000,000
On Update Beach Management Plan Cash Beach Preservation Fee Fund 25,000
On Shoal Management Wild Dunes (25%, cost shared with WDCA) Cash Beach Preservation Fee Fund 430,500
On Inlet Management Cash Beach Preservation Fee Fund
On Sea Level Rise Adaptation Plan Cash Beach Preservation Fee Fund
On Required post project monitoring (FY24 is last year) Cash Beach Preservation Fee Fund
Off Ongoing monitoring of shoreline Cash Beach Preservation Fee Fund 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000
On 855,000 940,000 4,410,000 365,000 385,000 365,000 385,000 1,245,500 385,000 20,478,865 365,000
On Isle of Palms Marina
Off Public Greenspace Cash Marina Enterprise Fund 150,000 150,000
Off Resurface City's portion of reconfigure Parking Lot Cash Marina Enterprise Fund 150,000 300,000
On Engineer, design & Construction oversight improvements to public dock and T
dock on ICW Cash Marina Enterprise Fund
On Bidding & construction oversight - public dock & T dock construction Cash Marina Enterprise Fund
On New public dock offset by ARPA $1M Cash Marina Enterprise Fund
On T dock repairs ($166K of $200K moved from FY24 to FY25) Cash Marina Enterprise Fund
On Replace bulkhead (FY33+) Cash Marina Enterprise Fund
On Replace boat ramp (FY33+) Cash Marina Enterprise Fund
On Replace Marina docks along Morgan Creek (FY40+) Cash Marina Enterprise Fund
Off Marina maintenance contingency for common areas not covered by leases.
Calculated as .6% of insured boat ramp, bulkhead and dock value. Cash Marina Enterprise Fund 75,000 75,000 75,000 75,000 75,000 75,000 75,000 75,000 75,000 75,000 75,000
Off Marina dredging - Funded by State Budget Allocation FY25 includes permit
coordination, bidding and construction admin. (Moved from FY25 to FY26) Cash Marina Enterprise Fund 1,500,000 1,500,000
On Re-coat marina bulkhead Cash Marina Enterprise Fund 450,000
21