Agenda
City of Isle of Palms · Charleston County · meeting of Feb 3, 2026 · Agenda packets
Open the original document More from City of Isle of Palms
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Public Safety Committee
11:00am, Tuesday, February 3, 2026
City Hall Council Chambers
1207 Palm Boulevard, Isle of Palms, SC
Public Comment:
Citizens who wish to speak during the meeting must email their first and last name,
address and topic to Nicole DeNeane, City Clerk, at nicoled@iop.net no later than 3:00
p.m. the day before the meeting. Citizens may also provide written public comment
here: https://www.iop.net/public-comment-form
Agenda
1. Call to order and acknowledgement that the press and the public have been
duly notified of the meeting in accordance with the Freedom of Information
Act.
2. Election of Chair and Vice Chair
3. Citizen’s Comments – All comments have a time limit of three (3) minutes.
4. Approval of previous meeting’s minutes – November 13, 2025.
5. Old Business
a.
Update on scope of future traffic study
b. Discussion on AI Traffic Signal Software
c. Update on painting of crosswalks at 43rd and 46th avenues
d. Discussion of Public Safety-related matrix recommendations
6. New Business
a. Consideration of purchase of turnout gear for the Fire Department
b. Discussion/status update of IOP Connector redesign
c. Review of 10-year Capital Plans for Police and Fire Departments
7. Miscellaneous Business – Next meeting date: March 3, 2026 at 11am.
8. Adjournment
Public Safety Committee Meeting
11:00am, Thursday, November 13, 2025
1207 Palm Boulevard, Isle of Palms, SC and
broadcasted live on YouTube: https://www.youtube.com/user/cityofisleofpalms
MINUTES
1. Call to Order
Present: Council members Streetman, Anderson, Bogosian
Staff Present: Administrator Kerr, Chief Oliverius, Deputy Chief Thompson
2. Citizen’s Comments -- none
3. Approval of Previous Meeting Minutes – October 7, 2025
MOTION: Council Member Streetman made a motion to approve the minutes of the
October 7, 2025 meeting. Council Member Anderson seconded the motion. The motion
passed unanimously.
4. Presentation – Reggie Chandra, Rhythm Solutions, Adaptive Traffic Systems
Mr. Reggie Chandra of Rhythm Solutions explained “traffic signal optimization” and how it is
being employed in Mt. Pleasant. He shared some smart technology options that could be used at
the intersection of Palm Boulevard and the Isle of Palms Connector including the adoption of a
protected green light. He stated that these options will eliminate the need to have a police officer
directing traffic, but it is “not a cure for oversaturation.” Cost sharing of a queue monitor is
possible. He estimates the costs at $70-$80,000.
Administrator Kerr has spoken with SCDOT and they are in support of adaptive signals. They
will allow use of their signal boxes, but they will not help with the cost. He cautioned Committee
members that these sorts of systems will not fix capacity problems.
Administrator Kerr suggested an RFQ or RFP to allow City Council to grade the companies and
discern a path forward. Council Member Streetman asked Administrator Kerr to do some
research into the companies with such offerings and bring that information back to the
Committee.
5. Old Business
A. Discussion of changes to the noise ordinance
Committee members agreed that the redline version should continue to Second Reading.
Public Safety Committee, 11/13/2025
2
B. Update on scope of future traffic study
Administrator Kerr said he spoke with BCDCOG who suggested the City create a relationship
with a traffic engineer much like their relationship with CS&E. He spoke with Jennifer Beall
about the matter, and she shared her contract with the City of Charleston with him.
Council Member Anderson said she sees such a relationship with Ms. Beall as an on-call traffic
engineering consultant, to be called on when the City has a pertinent issue. She also suggested
that Ms. Beall could help effectuate the recommendations of the mobility study.
Administrator Kerr reminded the Committee that professional services do not have to go through
the procurement process. He will give her proposal and a not-to-exceed amount to City Council
to consider at their January meeting.
C. Update on Breach Inlet signage
Council Member Bogosian said he has received complaints about the sign placement. Chief
Oliverius said he has not received any complaints, adding that people may need to take more
time to understand the signage. Chief Thompson added that BSOs are in the area to enforce the
no swimming ordinance. Public Safety also receives phone calls when people are swimming in
the inlet.
D. Update on painting of crosswalks at 43rd and 46th avenues
Administrator Kerr said Asst. Director Asero is speaking with SCDOT about the order in which
work needs to be done to have the crosswalks painted. If SCDOT wants the bricks painted first,
then it could be another month before the crosswalks are painted.
E. Discussion of Public Safety-related matrix recommendations
Administrator Kerr said staff is still working on prioritizing the recommendations. Many of them
are in progress.
5. New Business
A. Discussion of additional speed signs
Deputy Chief Thompson said Chief Cornett is hesitant to add more speed signs in the Forest
Trails area. If the City were to add more signs, they can only be added in the areas maintained by
the City. He will investigate what areas of Forest Trails are receiving the speeding complaints.
Council Member Bogosian prefers to defer the matter for additional signs to the Police
Department.
B. Discussion of no passing on Palm Boulevard
Council Member Bogosian said he has received complaints about the passing zone on Palm
Boulevard near the Exchange Club. Deputy Chief Thompson said if the City requests No Passing
signs for that area, SCDOT will install them. Council Member Bogosian said if the Police
Department deems the area unsafe for passing, then they should make the request for the signs.
Public Safety Committee, 11/13/2025
3
6. Miscellaneous Business
There will be a drop-in acknowledging Chief Eagle’s retirement on December 15.
The Committee will not meet in December unless an issue needing their attention arises.
A brief discussion about staff retention and the wage & compensation study ensued. Council
Member Bogosian said the Administration Committee will take up the recommendations when
the study is completed.
Council Member Streetman wished Council Member Anderson well as she leaves City Council
next month.
7. Adjournment
Council Member Bogosian made a motion to adjourn, and Council Member Anderson seconded
the motion. The meeting was adjourned at 12:15pm.
Respectfully submitted,
Nicole DeNeane
City Clerk
PRODUCT CATALOG
v22/May 2022
How In|Sync Works
Performance
Architecture
Models
Hardware
Software
Communications
Deployment Process
www.rhythmtraffic.com
REAL-TIME
ADAPTIVE TRAFFIC SIGNAL SYSTEM
2
Dear fellow traffic professionals,
In 1993, I started practicing as a traffic engineer with the City of Springfield, MO. I was
working with PASSER 2 and TRANSYT-7F on a 486 DOS machine cranking out timing
plans. (I am dating myself and a select few probably still remember the technologies.)
In 1995, you needed a dedicated pair of fiber-optic cable in order to bring video feed
from a CCTV camera back to a Traffic Management Center. Technology has come a long
way since then. Now, you can cram the entire data needs of a city into a pair of fibers!
Unfortunately, the traffic industry has not kept up with the changes in technology.
I didn’t for the life of me think that after 2.5 decades, I would be where I am today.
Leading the traffic signal technology charge with a team of dreamers .
Passionate and relentless dreamers who are attempting to make a positive difference to
the way traffic flow is managed in the United States and Canada.
Here is our promise to you.
We will not rest or passively stand by watching as lack of technology negatively affects
traffic flow in North America.
We will not rest till every traffic professional in North America is provided with effective
tools to manage their traffic signals.
This is our promise.
Very respectfully,
The information in this document was reviewed and published in October 2021.
All information in this catalog is copyrighted and may only be reused with written consent from Rhythm Engineering.
In|Sync is protected by U.S. Patent Nos. 8,050,854; 8,103,436; 8,253,592; 8,653,989; 8,922,392
Reggie Chandra, Ph.D., PE
Lead Traffic Engineer + CEO
3
The In|Sync Model
Benefits of In|Sync
Validation Studies
Testimonials
Our Partners
Architecture
Models
Hardware
Main Components
In|Sync Processor
Equipment Panel
Standard Camera
Any Weather Camera
Thermal Detection Unit
Connection Options
C1 Y-Cable
ABC Y-Cable
SDLC Intercept Module
Optional Components
Intercept Module
DIN Relay
Monitor/Keyboard
Pedestrian Integration
Software - In|Traffic
WebUI
Communications
Deployment Timeline
4
6
8
10
12
14
16
18
32
34
36
38
18
20
21
22
23
24
25
26
27
28
29
20
31
Table of Contents
4
Module #1: Digitize Traffic Signal Operations
All other existing traffic signal synchronization methodologies work off of the concept of
common cycle lengths. A cycle length is an emulation of the dial in an electromechanical
controller and therefore analog in nature.
The two major issues with common cycle lengths are that:
1. Vehicles have to wait on the side streets even when there is no one on the main street.
2. Signal transition. This happens when a signal skips phases and is in a state of chaos as
it changes timing plans or after a signal preemption.
In|Sync does not use common cycles.
Unlike all other existing traffic-signal
models, it uses the concept of states.
A state is a pair of concurrent phases that
can be green simultaneously without
conflict. In|Sync differs from the sequential
and set nature of phases in a cycle, because it can invoke any state as and when needed.
The difference is very much like the difference between the old TV channel selector and
the modern remote control . With the old, you had to click your way sequentially through
each channel before you could select the channel you wanted. With the modern remote
control, you can directly select the channel you want by typing its number.
Examples of states
(phase pairs)
Example of a sequence
The In|Sync Model
The In|Sync system delivers 40% more effectiveness and performance measures than
any existing system that optimizes traffic signal coordination. This fact has been proven by
over three dozen independent validation studies.
These improvements can be attributed to the three distinct modules that seamlessly work
together inside the In|Sync model.
Electromechanical
controller
The benefit of having a digital
architecture is that green time is not
wasted serving empty phases and there
is no transition between timing plans.
In|Sync processor, a digital state machine
5
Module #3: Global Optimization
In|Sync guarantees coordination between
traffic signals (even unevenly spaced traffic
signals) without increasing side street delay
using a concept called “ Time Tunnels .”
Time Tunnels are created throughout the
corridor (or grid network) with the slope
of the tunnel indicating the speed of travel
between traffic signals.
The scheduling of green for the coordinated phases are the top priority for the In|Sync
model. The coordinated phases are guaranteed to be green along the speed line and all
other movements are scheduled around this.
The point of initiation of green for the coordinated phases are the only fixed points in
the signal operation and all other points in time are floating . The tunnels can have variable
duration based on demand or can be programmed to have a minimum green duration.
The tunnels can be truncated based on demand, the green durations for various phases
are based on the Greedy Algorithm, and the time-between-tunnels can vary as well. All of
these processes happen in real-time .
Module #2: Local Optimization
In|Sync uses a rule-based Artificial
Intelligence (AI) algorithm to compute real-
time green durations to vehicle demand at
each local intersection.
In|Sync knows the duration of wait times
for every vehicle near the stop bar and the
queue length for every lane. This information
is collected every second in real-time . In|Sync allocates a token for every unique car
that joins the queue. An additional token is given to each car that waits every 5 seconds.
The Greedy Algorithm changes the traffic signal light status to minimize the number of
tokens issued. Thus, the local optimizer considers the number of cars waiting (real-time
demand) and how long they have been waiting (delay).
This patented algorithm does not use out-dated Webster-equation based modeling and is
proven to produce unparalleled results in the field.
In|Sync Model Captured in One Sentence
The In|Sync model gives you the power to turn your coordinated movements
green when you want them to be green and the rest of the time the signal operates
in free/actuated mode (with the local optimizer running the Greedy Algorithm).
6
Benefits of In|Sync
Proven to reduce crashes
by 15%-30% 5, 12, 13, 20
Multiple independent validation
studies have proven that In|Sync
reduces crashes significantly
through the corridor. The studies
show that angular crashes as well
as rear-end crashes are reduced.
Vehicle emissions and
fuel consumption reduce
by 34%2-21
The impact to the environment
and reliance on fossil fuels are
immediate and impressive.
Agencies that are combating air
pollution are deploying In|Sync as
a solution to improving air quality.
Proven to consume the
least amount of
human intervention
and staff time 16
The adoption rate of In|Sync in the
USA proves this point.
Agencies without sufficient and
dedicated staffing for traffic signal
operations select In|Sync to manage
their traffic signal operations.
Proven to reduce vehicle
stops by 80%2-21
In|Sync ’ s Global Optimizer
creates guaranteed time tunnels
between traffic signals. The digital
architecture is capable of creating
unparalleled progression between
traffic signals.
In|Sync does not require
installation of additional
vehicle detectors
In|Sync comes with its own
vehicle detection and data
collection system. It is a complete
package without the need for
installing additional detection
devices.
Proven to reduce delay
by 73% 2-21
Studies have proven that In|Sync
significantly decreases main street
delay by enhancing progression
and reduces side street delay
by reducing the wait times and
queues (Local Optimizer).
In|Sync is compatible
with all existing hardware
(cabinets and controllers)
and software
(central system software)
In|Sync is highly versatile and can
be configured for any controller or
cabinet available on the market.
In|Sync provides real-time analysis
and operations.
Its dynamic optimization algorithms
serve traffic based on real-time
demand and delay analysis.
Thus In|Sync makes adjustments to
green splits, sequences and time
between tunnels, instantly.
In|Sync is the ONLY real-
time adaptive traffic signal
system in the market 1, 16
1 2
3 4
5 6
7 8
7
1. Adaptive Control System Recommendation.
In Adaptive Control System Review. (2016). Iteris
2. Adaptive Traffic Control Test System
Evaluation. (2014). Urban Systems Associates
3. Adaptive Traffic Signal Control System. Before
& After Travel Time and Delay Study. (2011).
HDR Engineering
4. Barrera, J. R. (2015). In|Sync Adaptive Signal
Control Technology. Effectiveness Study. AECOM
5. Bollinger, G. (2010). Evans, Georgia. Case
Study. Columbia County, GA
6. Brian R. Keaveney, B. R. (2010). Traffic Signal
System Comparison. Route 202 and Gulph
Road/Mall Boulevard. Upper Merion Township,
Montgomery County. Pennoni Associates
7 . Elefteriadou, L., Martin-Gasulla, M., &
Manjunatha, P . (2017). Before and After -
Implementation Studies of Advanced Signal
Control Technologies in Florida. Transportation
Institute, University of Florida
8. Evaluation of Main Street Adaptive Traffic
Signal System For the City of Salinas. (2011).
TJKM Transportation Consultants
Vehicles do not wait on side
streets when there is no
demand on the main street
In|Sync ’ s digital architecture does
not waste time by providing green
to traffic movements without
demand. This game-changing
(Local Optimizer) technology is
used daily in controlling traffic
in some of the most congested
intersections in the USA.
Proven to have the least
amount of down time
compared to other similar
systems16
99% of In|Sync systems that have
been sold are operational. The
extensive failure mitigation systems
keep your corridor operational.
In|Sync can effectively mitigate
detection, communication and
hardware failures.
In|Sync is a product and
not a project
Deploying In|Sync is like installing
a detection system. Once installed,
the adaptive operation can be fully
turned on in as little as 2 weeks.
The process is so painless that
Rhythm engineers are turning on
1 corridor somewhere in the USA
every single week.
24/7/365 remote
support directly from
the manufacturer of the
technology in the USA
Help is just a phone call away and
when you need it.
Transition between timing
plan changes and after
preemptions are eliminated
This is one of the benefits of the
digital architecture. With In|Sync
wasted green times are a thing of
the past.
Progression is guaranteed
between signals even when
the traffic signals
are unevenly spaced
In|Sync’ s patented Global Optimizer
guarantees efficient progression
between systems. The longest
system is 9 miles long, 26 traffic
signals on a roadway that spans 2
cities, 2 counties and 2 states.
9 10
11 12
13 14
9. Fontaine, M. D., Ma, J., & Hu, J. (2015).
Evaluation of the Virginia Department of
Transportation Adaptive Signal Control
Technology Pilot Project. Virginia Center for
Transportation Innovation & Research
10. Hathaway, E., Urbanik, T ., & T soi, S.
(2012). Transportation Operation Innovation
& Demonstration Evaluation/Statewide.
Kittelson & Associates
11. Hatton, C. C (2012). In|Sync Evaluation
Before and After Study. Pinellas County,
Florida. Kimley-Horn and Associates
12. Hutton, J. M., Bokenkroger, C. D., &
Meyer, M. M. (2010). Evaluation of an
Adaptive Traffic Signal System: Route 291 in
Lee’s Summit, Missouri. Midwest Research
Institute
13. Janczys, D. (2010). Springdale, Arkansas.
Case Study. City of Springdale, AR
14. Nichols, A. P . (2012). Travel Time
Evaluation of Teays Valley In|Sync Deployment.
Rahall Transportation Institute
Marshall University
15. San Ramon Adaptive Signals Study. (2010).
DKS Associates
16. Selinger, M., & Schmidt, L. (2010).
Adaptive Traffic Control Systems in the United
States: Updated Summary and Comparison.
HDR Engineering
17 . Shoreline Adaptive Signal System Final
Corridor Performance and Evaluation Report.
(2016). TJKM Transportation Consultants
18. Stevanovic, A., & Zlatkovic, M. (2012).
Comparative Evaluation of In|Sync and Time-
Of-Day Signal Timing Plans Under Normal and
Varied Traffic Conditions.
Florida Atlantic University
19. 10th Street Adaptive Signal Timing.
Evaluation of In|Sync System Implementation.
(2012). Atkins
20. Voss, L. (2011). Topeka, Kansas. Case
Study. City of Topeka, KS
21. ZOO Interchange Adaptive Signal System.
WIS 100 In|Sync Adaptive Signal Study. (2013).
TranSmart Technologies
8
Performance
Independent Validation of In|Sync Performance
Independent studies from engineering firms and universities confirm In|Sync
delivers measurable benefits several times greater than other adaptive systems and
other approaches to signal synchronization.
The third-party organizations that have evaluated In|Sync include:
For more information on the system’ s intelligence, model and
performance and to access these complete before-and-after studies,
please visit rhythmtraffic.com/resources .
• Ludian
• AECOM (Farmington, NM)
• Atkins
• DKS Associates
• HDR, Inc.
• Kimley-Horn and Associates
• Kittelson & Associates
• Lee Engineering
• MRIGlobal
• Olsson Associates
• Pennoni Associates Inc.
• Rahall Transportation Institute,
Marshall University
• Dr. Aleksandar Stevanovic, Florida
Atlantic University
• TJKM Transportation Consultants
• Virginia Center for Transportation
Innovation & Research (Virginia DOT)
• University of Florida
Transportation Institute
• University of Kentucky
Transportation Center
The #1 Adaptive Traffic Signal System in the U.S.
In|Sync is a real-time adaptive traffic signal control solution. It is deployed by more
traffic agencies in the United States than any other adaptive technology. This is because
the patented, award-winning In|Sync system enables traffic signals to synchronize
in real-time .
Numerous independent studies from various engineering firms confirm that In|Sync
delivers measurable benefit several times greater than other adaptive traffic control
solutions and other approaches to signal synchronization.
By combining real-time data collection with real-time signal optimization, it is proven
that In|Sync dramatically reduces stops, delays, travel time, fuel consumption, vehicle
emissions and most importantly, crashes.
9
Community
Source
Reduced
Stops
Reduced
Delay
Reduced
Travel Time
Reduced
Fuel Consumption
Reduced
Emissions
Increased
Average
Speed
Annual Savings
to Motorists
Henderson, NV
Ludian, 2021 53% 34% 16.3% N/A 5% 20% $10.3 Million
Longmont, CO
CDOT , CO, 2018 41% 52% 22% 6% N/A 27% $5.8 Million
Lewisburg, PA
Pennoni Associates Inc., 2018 58% N/A 41% N/A N/A 94% N/A
Pinellas Cty, FL
Transportation Institute, UF , 2017 N/A 21% 16% N/A N/A 13% N/A
Mountain View, CA
TJKM Transportation Consultants, 2016 40% 39% 28% N/A N/A 54% N/A
State of Virginia
VCTIR, 2015 68% NA 37% 39% N/A 59% $33.4 Million
Farmingtion, NM
AECOM, 2015 64% 39% 14% N/A N/A N/A $1.1 Million
San Diego, CA
Urban Systems Associates, Inc., 2014 59% N/A 17% 27% N/A 17% N/A
Wauwatosa, WI
TranSmart Technologies, Inc., 2013 32% 28% 10% N/A N/A N/A $1.3 Million
Volusia Cty, FL
Aleksandar Stevanovic, PhD, PE, and
Milan Zlatkovic, PhD, 2012
9% 18% 18% N/A NA 5% NA
Washington Cty, OR
Kittelson & Associates, Inc., 2012 N/A N/A 20% 39% N/A N/A N/A
Hillsboro, OR
Kittelson & Associates, Inc., 2012 NA 9% N/A N/A N/A N/A N/A
Greeley, CO
Atkins, 2012 43% 25% 10% 4% N/A 12% $1.3 Million
Columbia Cty, GA
Columbia County, GA, 2012 71% 72% 29% 15% 20% 54% $2.9 Million
Salinas, CA
TJKM Transportation Consultants, 2011 66% 72% 42% N/A N/A 70% $1.7 Million
Topeka, KS
City of Topeka, KS, 2011 73% 67% 41% 27% 32% 73% $2.1 Million
Mt. Pleasant, SC
HDR, 2011 58% 56% 23% N/A N/A 25% N/A
Wichita, KS
City of Wichita, KS, 2011 83% 66% 29% 21% 30% 45% $975,000
Columbia, MO
MoDOT , MO, 2010 74% 58% 20% N/A N/A 25% $1.9 Million
Lee’ s Summit, MO
MRIGlobal, 2010 73% 59% 23% 10% 19% 27% N/A
San Ramon, CA
DKS Associates, 2010 45% 45% 25% 16% 38% N/A $1.3 Million
Springdale, AR
City of Springdale, AR, 2010 88% 79% 35% 19% 28% 56% $5.1 Million
Upper Merion, PA
PennoniAssociates, 2010 23% 32% 26% N/A N/A 39% $795,000
Hillsboro, OR
Kittelson & Associates, Inc., 2012 NA 9% N/A N/A N/A N/A N/A
10
Testimonials
“Tomorrow’ s technology is here today, so let’ s
see what it can do. In|Sync has proved to be
something worth your time and investment.”
Larry Haas, PE
Traffic Operations Engineer (fmr), CDOT |
Greeley, CO
“We got rave reviews not only from the public
officials, but from the motorists as well.”
Ashwin Patel, PE
District Traffic Engineer, Pennsylvania DOT |
Philadelphia, PA
“We have seen a clear improvement in traffic
flow, and we anticipate a significant reduction in
crashes. Thanks for a job well done.”
Donald DeBerry, PE
City Transportation Engineer | Lynchburg, VA
“The system is doing a great job of moving
traffic through the corridor.”
Dub Janczys
Signalization Supervisor (fmr) | Springdale, AR
“The system itself is very smart and addresses
issues as they come up.”
Brad Morrison
Transportation Director | Mt. Pleasant, SC
“It’ s like having several [extra] traffic engineers
on staff.”
Glen Bollinger, IMSA3
Traffic Engineer (fmr) | Augusta, GA
“There are many time periods and commuters
that are benefiting tremendously.”
Eric Kinard
Signals and Congestion Management
Supervisor, Penn DOT District 8 | Harrisburg, PA
“They were there every step of the way in telling
us what we would need. They were incredibly
helpful in working with the different vendors.”
Eric Bracke, PE, PTOE
City Traffic Engineer (fmr) | Greeley, CO
“The performance of the In|Sync system
exceeded our expectations. Eastern Avenue has
the reputation as a difficult corridor to manage.
So much so that some people were skeptical
an adaptive solution could provide much
improvement. At the end of the trial period, it was
great to see such skeptics turned into believers.”
John Peñuelas, Jr., P .E.
Senior Director of Engineering | RTC of Southern
Nevada
“Since the new signals were installed, we’ve seen
travel times reduced by as much as 25% during
rush hour. We’ve also seen the number of stops at
these traffic signals decrease by as much as 53%,
depending on the signal. We have residents and
commuters who travel this corridor every day — and
they’ve definitely noticed an improvement.”
Kevin Faulconer
Mayor of San Diego, CA
“The results of their equipment is instant.
The minute you turn it on the results are there.
Within five minutes of turning on our initial system
traffic completely changed on our main corridor.”
Matt Schlachter, PE
Deputy County Administrator, Construction &
Maintenance | Columbia County, GA
“This year it seemed to be a much smoother
(traffic) flow than we’ve had before.”
Randy Tennison
Senior General Manager for Jordan Creek
Town Center | West Des Moines, IA
“Everything we’ve been hearing about In|Sync
is positive…which is always good as we get less
calls, and that generally means your system is
working pretty good.”
Justin Hall
Public Works Division Manager | Winchester, VA
“It’ s real-time! When you have an influx of traffic,
it takes care of that traffic immediately!”
Jim Dickinson, PE
Principal Engineer - Traffic | West Des Moines, IA
11
“The number of stops is way down, the
congestion is way down, and it’ s a lot safer.”
Linda Voss, PE
Traffic Engineer (fmr) | Topeka, KS
“It’ s not like a traditional signal where the main
line is first, then the turns. Here, it’ s going to
decide it’ s easier for me to serve the left turn
movement before I let everyone else through.”
Alex Martinez
Senior Traffic Studies Specialist MoDOT |
Kansas City, MO“Putting the adaptive system in, we gained
efficiency and reduced the cost. It was a win–
win, no doubt about it.”
Bret Hodne
Public Works Director | West Des Moines, IA
“We found that In|Sync significantly improved
operations on the corridors, and we typically saw
improvement in main line travel time. We also
saw improvement on travel time reliability.
On the safety side, we looked at 47 intersections
around the state. On average, we saw a
significant reduction of 17% in total crashes.”
Michael D. Fontaine, Ph.D., PE
Associate Director for Safety, Operations, and
Traffic Engineering, VTRC | Charlottesville, VA
“In|Sync was the first system that we saw that
had a whole new approach… And we feel that it’ s
the best adaptive traffic control solution currently
on the market.”
Justin Schlaefli, PE, TE, PTOE
President, Urban Systems Associates |
San Diego, CA
“The installation of these new adaptive traffic
signals means less time spent on the road and
more time for commuters to spend with their
families. Residents are catching more green
lights than ever before and the community is
thrilled about it.”
Lorie Zapf
City Council Member | San Diego, CA
“Since In|Sync was installed, the report shows,
we have a 90% reduction in stops, travel time
has improved by 30%, fuel consumption is down
20%, and emissions (are) down 30%.
I’m impressed.”
Tom Evans, PE,PTOE
District Traffic Engineer (fmr), MoDOT |
Kansas City, MO
“When cars stop less often, the likelihood for
crashes also decreases. More smoothly flowing
traffic makes for safer commutes and a healthier
community.”
Matt Burns
Police Chief | Sioux Falls, SD
“I looked into it, and what attracted me the most
was that it was real time coordination. It’ s just
unbelievable – I drive from there every day now.”
Gigi O’Donnell
Traffic Signal Supervisor | Charlottesville, VA
“This technology is different than any other
system operating today. It addresses limitations
and deficiencies that nearly every traffic control
system has. For a long time, traffic engineers have
been hoping for a significant innovation in traffic
control and here it is.”
Matt Selinger, PE, PTOE
Transportation Program Manager | Omaha, NE
“Since the In|Sync system has been put in,
I might not get stopped one time in a whole series
of signals, which to me is phenomenal!”
Eddie George
Traffic Supervisor | Aiken, SC
“Any time you call them, they are there to help
and guide you step-by-step.”
Charles DeVitis, IMSA3
Traffic Signal Supervisor |
Upper Merion Township, PA
“Traffic flow has improved and is at least 40%
more efficient.”
Terry LaFleur
Communications Systems Manager |
Beaumont, TX
“Unlike older technologies, In|Sync can adjust
to immediate changes in traffic... In|Sync looks
at exactly what is currently happening and
immediately adjusts to an unexpected change
in traffic. It’ s impressive to see how quickly the
system adapts.”
Bill Henry, PE
Traffic Engineering Manager (fmr) | Little Rock, AR
1
2
3
4
5
6
7
8
9
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
C D E F I J K L M N O P Q R S
City of Isle of Palms, SC
Capital Planning Model
Capital Improvement Plan
New, M ajor C hanges, Deferred from FY 26
1 2 3 4 7 8 9 10 11 12 13 14 15 16 17
On/Off Description Funding Type Fund 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
On Police Department
On 26 Patrol V ehicles total on average are replaced in the 6th year. Cash
On Patrol SUV s on average are replaced in the 6th year. Cash Capital Projects Fund 64,000 64,000 - 66,000 68,000 70,000 72,000 74,000 76,000 78,000 80,000
On Patrol SUV s on average are replaced in the 6th year. Cash Municipal A ccommodations Fee Fund 64,000 64,000 - - 68,000 70,000 - 74,000 76,000 78,000 -
On Patrol SUV s on average are replaced in the 6th year. Cash Hospitality Tax Fund - 68,000 - 72,000 74,000 76,000 - 80,000
On 2 Patrol SUV s on average are replaced in the 6th year. (New Officers) Cash State A ccommodations T ax Fund 128,000
On 3 Patrol sedans Cash Capital Projects Fund
On Patrol F150 pickup trucks Cash Capital Projects Fund 67,000 69,000 71,000 - 83,000
On Patrol F150 pickup trucks Cash Municipal A ccommodations Fee Fund
On Patrol F150 pickup trucks Cash Hospitality Tax Fund 67,000 69,000
On Beach services 4W D pickup Cash State A ccommodations T ax Fund 50,000 64,000
On ACO 4WD Pickup Truck Cash Capital Projects Fund 51,000
On (2) 2025 Y amaha A T V Beach services utility Cash State A ccommodations T ax Fund 22,000 23,000 26,000 29,000
On (2) 2024 4x4 UT V W / plow attachment Cash Hospitality Tax Fund - 24,000 27,000 30,000
On Pickup truck for Code Enforcement Cash Hospitality Tax Fund 55,000 59,000 65,000
On L ow speed vehicles (L SV s) for parking mgt Cash State A ccommodations T ax Fund -
On 2022 Polaris GEM transfer to PCI Cash Capital Projects Fund - - - -
On Front Beach surveillance system (approx. 7 cameras) Cash State A ccommodations T ax Fund 35,000 40,000
On Recording equipment (tie in with outside surveillance sys) Cash Municipal A ccommodations Fee Fund 20,000
On C omputer servers per V C 3 recommendation (need more information) Cash State A ccommodations T ax Fund 18,000 18,000 21,000 22,000 26,000
On PD radios (in-car & walkies) (58 radios at $6K in FY 28) Cash Hospitality Tax Fund 21,500 348,000
On Speed radar & trailer Cash State A ccommodations T ax Fund 20,000 8,500
On 7 traffic counters located at C onnector & Breach I nlet Cash Capital Projects Fund - 30,000 30,000
On T wo license plate reader (L PRs) for mobile parking enforcement Cash Municipal A ccommodations Fee Fund
On Police & C ourt Records M anagement System ( cloudbase C ivic RM S) Cash State A ccommodations T ax Fund 70,000 21,500 22,000 22,500 23,000 23,500 24,000 24,500 25,000 25,500
On D e-escalation & Use of Force training simulation sys (software & hardware) Cash Municipal A ccommodations Fee Fund -
On A dd automatic license plate reader for I OP C onnector for investigative
purposes. Recurring $5k fee for subscription Cash State A ccommodations T ax Fund 13,000 15,000
On E vidence refrigerator Cash Capital Projects Fund
On Mobile digital billboard Cash Capital Projects Fund 20,000
On New computers (replace windows 10 PCs 16 Units @ $2500) Cash Municipal A ccommodations Fee Fund 40,000 20,000
On T aser (C onducted E nergy W eapons) Upgrade Cash State A ccommodations T ax Fund
On Public Safety Building access control system (1/2 Police) Cash Capital Projects Fund
On Public Safety Building access control system (1/2 Police) Cash State A ccommodations T ax Fund
On IT Room battery back-up replaced FY 25 Cash Hospitality Tax Fund 12,000 15,000
On Public Safety D rone (D rone as First Responder Software) Cash State A ccommodations T ax Fund 37,150 40,500 44,000 47,000
On D rone First Responder D ocking System (5 years) Cash Capital Projects Fund 375,000
On PSB Gate 50% Cash State A ccommodations T ax Fund 6,000
On I n-C ar C radlepoint (16 patrol vehicles) Cash Municipal A ccommodations Fee Fund 33,000 8,700 8,700 8,700 8,700 38,000 9,000 9,000 9,000 9,000
On AI traffic signal Cash State A ccommodations T ax Fund 100,000 12,000 12,000 12,000 12,000 12,000 12,500 12,500 12,500 12,500
On A I report writing software (25 officers @ $60 mthly) Cash Hospitality Tax Fund 18,000 19,000 20,000 21,000 22,000 23,000 24,000 25,000 26,000 27,000
Off 301,000 1,004,150 668,200 298,700 341,700 334,700 381,500 375,500 328,000 511,500 311,000
On Fire Department
On 2021 E-One T yphoon Fire Engine E1002 (Pumper) (L T 24 mths) Station 2 New D ebt State A ccommodations T ax Fund 1,500,000
On 2009 E-One T yphoon Fire Engine E1001 (Pumper) (L T 24 mths) Station 1
(M oved from FY 25 to FY 28 & $1M to $1.5M ). New D ebt Municipal A ccommodations Fee Fund 1,500,000
On 2003 E-One Cyclone II T ower T W 1002 95' L adder T ruck (L T 24 mths) ($1M to
$2.5M ) New D ebt State A ccommodations T ax Fund 2,500,000
On 2020 E-One T yphoon L adder L 1001 - 75' L adder T ruck (~2034) New D ebt Municipal A ccommodations Fee Fund 3,500,000
On 2022 Ford F-150 C1002 Deputy Fire Chief Station 2 Cash Capital Projects Fund 85,000
On 2023 Ford Expedition C1001 Fire Chief Station 1 Cash State A ccommodations T ax Fund 85,000
On 2023 Ford F-150 BC1006 Battalion Chief Station 1 Cash Municipal A ccommodations Fee Fund 125,000
On 2023 Ford F-150 SQ1001 Squad Station 1 Cash Capital Projects Fund 125,000
On 2019 Ford F-150 BC1004 Battalion Chief Station 1 Cash State A ccommodations T ax Fund 75,000 75,000
On 2020 F-150 FM 1005 Fire M arshall Station 1 (failing transmission/changing
specs) Cash Hospitality Tax Fund 75,000 -
On 2014 Ford F-150 T K 1002 T ruck Station 2 Cash Municipal A ccommodations Fee Fund
On High-W ater V ehicle (Future Y ear) Cash Capital Projects Fund - 365,000
On High W ater E quipment & T railer (Suit and Raft) Cash Capital Projects Fund 30,000
On 2022 John Deere M ules M L 1001, M L 1002 & M L 1003 Cash Capital Projects Fund 27,000 27,000 21,000 28,000 22,000 29,000
On 2017 Sea-Doo Jet Ski JS1003 Station 1 Cash State A ccommodations T ax Fund 19,000 20,000
On 2021 Sea-Doo Jet Ski JS1001 Station 1 (Deferred from FY 26) Cash Municipal A ccommodations Fee Fund 18,000 18,000 20,000 20,000
On 2022 Sea-Doo Jet Ski JS1002 Station 2 Cash Municipal A ccommodations Fee Fund 20,000
On 2017 A lweld Boat B1017 Flat Bottom Cash State A ccommodations T ax Fund 25,000
1
2
3
4
5
6
7
8
9
C D E F I J K L M N O P Q R S
City of Isle of Palms, SC
Capital Planning Model
Capital Improvement Plan
New, M ajor C hanges, Deferred from FY 26
1 2 3 4 7 8 9 10 11 12 13 14 15 16 17
On/Off Description Funding Type Fund 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
On 2012 Pioneer Sport Fish Boat B1020 with Pump (Obsolete) Cash
On New Rescue Boat (25% C ity 75% FE M A G rant) L ead time 12 mths (I f grant is
not awarded need $1M in FY 29) Cash Municipal A ccommodations Fee Fund 100,000 100,000
On New Rescue Boat (25% C ity 75% FE M A G rant) L ead time 12 mths (I f grant is
not awarded need $1M in FY 29) Cash Hospitality Tax Fund 100,000 100,000
On New Rescue Boat (25% C ity 75% FE M A G rant) L ead time 12 mths (I f grant is
not awarded need $1M in FY 29) Cash State A ccommodations T ax Fund 100,000 100,000
On One T hermal imaging camera (we have 4) in future repl all at once Cash Capital Projects Fund 20,000 70,000
On One T hermal imaging camera (we have 4) in future repl all at once Cash State A ccommodations T ax Fund 20,000
On Radios & Flash Upgrade T D M A (in-car & walkies) Cash Capital Projects Fund 27,500 275,000 -
On Porta-Count machine for SCBA mask fit testing (only w/ failure) Cash Capital Projects Fund 30,000
On RAD-57 medical monitor for carbon monoxide & oxygen (only w/failure) Cash Hospitality Tax Fund 7,000 8,000 9,000
On C utters, spreader, hose and pump for "jaws of life" equip (C ity Portion 5% if
grant is awarded) Cash State A ccommodations T ax Fund 15,000
On T wo Ram extrication devices Cash Municipal A ccommodations Fee Fund 15,000
On Battery operated combination extrication tool for Sta2 Cash Capital Projects Fund 20,000
On New airbags and hoses for vehicle accident extrications Cash Capital Projects Fund 12,000
On A ll terrain veh (A T V s) for beach patrol, add ambulatory pkg to 1 * * L eave as-
is(every 3yrs) Cash Hospitality Tax Fund 26,000
On T wo (2) portable deck guns to be mounted on pumper trucks ($10K to $9K ) Cash Capital Projects Fund
On T wo (2) Battery powered Positive Pressure V entilation (PPV ) fans Cash Municipal A ccommodations Fee Fund 12,000
On Two cardiac monitors for Paramedic program Cash Capital Projects Fund 130,000
On SC BA (self contained breathing apparatus) E valuate in FY 32 Cash Capital Projects Fund 350,000
On 2nd set of bunker gear (protective helmet, flash hood, coat, pants, boots &
gloves) for all personnel ($6,000* 36). A pprox 10-yr life Cash Capital Projects Fund 216,000
On Exhaust system for both stations Cash State A ccommodations T ax Fund
On High-rise kits requited for automatic aid Cash Municipal A ccommodations Fee Fund
On Physical agility testing equipment, 75% covered with a grant Cash Hospitality Tax Fund 55,000 35,000
On Public Safety Building Access Control System Station 1 (1/2 FD & 1/2 PD) Cash Capital Projects Fund
On Public Safety Building Access Control System Station 1 (1/2 FD & 1/2 PD) Cash State A ccommodations T ax Fund
On T raining Room T echnologies/I T Replacement & Upgardesfor M E OC & T raining
Classes Cash Capital Projects Fund 20,000
On Training mannequins (three fire rescue and two medical training mannequins)
and T raining SC BA Self C ontained Breathing A pparatus Cash State A ccommodations T ax Fund 25,000
On PSB Gate 50% Cash State A ccommodations T ax Fund 6,000
On Door Access Controls at Fire Station No. 2 to match Fire Sta. No. 1 Cash Municipal A ccommodations Fee Fund
On Body Armor Cash Capital Projects Fund - 25,000 25,750
On Public Safety D rone (D rone as First Responder Software) Cash Capital Projects Fund 37,150 - - 40,500 - - 44,000 - - 47,000
Off 402,000 3,121,650 2,197,000 200,000 458,500 285,000 588,000 1,593,000 3,545,750 139,000 47,000
Source: City of Isle of Palms website. First collected Oct 13, 2026.