Opry House Building RFP Pre-Bid Meeting Minutes
Town of Pacolet · Spartanburg County · meeting of Jul 8, 2026 · Minutes
Open the original document More from Town of Pacolet
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Pacolet
Opry House Building RFP Pre-Bid Meeting Minutes
Date: June 24, 2026
Location: Opry House Building, Pacolet, SC
Attendees
Town of Pacolet
• Patrick Kay, Town Administrator
• Jennifer Gilbert, Town Clerk
Prospective Respondents
• Daniel Rowan, Design Habitat – daniel@designedhabitat.org
• Ryan Hornung, Design Habitat – ryan@designedhabitat.org
• Ethan Shuler, Liles Construction – eshuler@lilesconstruction.com
• Kevin Wilkie, Randall’s Mechanical Services, LLC – rmssc@yahoo.com
• Ray Rogers – ray112542@gmail.com
• Donnie Holcombe Burnette – donniehb@live.com
• Ethan Floyd, PTL Construction – ethanptlconst@gmail.com
• Brantley Green, Green Design & Consultants – 843-602-2247,
Brantleygreen@aol.com
Meeting Summary
Patrick Kay welcomed everyone to the mandatory pre-bid meeting and provided an
overview of the project.
Mr. Kay explained that the purpose of the project is to update the Opry House building to
address life safety concerns and bring the facility into compliance with current building
codes so it can be reopened for public use.
Mr. Kay also informed attendees that the selected contractor will be required to obtain all
applicable permits for the project; however, permit fees will be waived by the Town.
Following Patrick Kay’s introduction, Ray Rogers, who prepared the existing plans for the
project, reviewed the primary items that should be addressed during the renovation.
Project Priorities Discussed by Ray Rogers
• Install or update exit signs and emergency lighting.
• Construct ADA-compliant handicap ramps where required.
• Update the building’s electrical system to meet current code requirements.
• Replace deteriorated or rotten wood as needed.
• Primer and painting are not included, as the Town expects volunteers to complete
that portion of the work.
• Existing restrooms are already ADA compliant and are not anticipated to require
significant modifications for accessibility.
• Replace or modify door hardware to include proper door closers and lever-style
handles instead of round knobs.
Questions and Answers
Question (Brantley Green):
Is there a problem turning the power on at the building?
Response (Patrick Kay):
No. The electrical service was previously in the former tenant’s name. Power can be
restored when needed for the project.
Question (Brantley Green):
Regarding the electrical wiring coming out of the walls, are there metal boxes or conduit
that can be reused?
Response (Ray Rogers):
All electrical work will need to be brought up to current code requirements and corrected
as necessary.
Question (Brantley Green):
If, during the course of preparing the proposal, additional items are identified that are not
currently ADA compliant, should those items be included in the proposal?
Response (Ray Rogers):
Yes. Any additional ADA deficiencies observed should be included in the proposal.
Question:
Is the Town’s plan for the selected contractor to begin work immediately after selection?
Response (Patrick Kay):
No. Once proposals are received, they will be posted on the Town’s website for a 15-day
review period before a final award decision is made. After the contract is awarded, the
selected contractor may begin work.
Additional Information
• The Town anticipates that a recommendation for award may be presented to Town
Council at its August 6, 2026, meeting, unless Council determines that an earlier
award is appropriate.
• The deadline for submitting written questions regarding the RFP is July 3, 2026.
Adjournment
The meeting concluded following the discussion of project priorities and the question-and-
answer session. Attendees were encouraged to submit proposals in accordance with the
requirements and deadlines outlined in the Request for Proposals.
Source: Town of Pacolet website. First collected Oct 13, 2026.