Onsite Meeting
10/24/2024
2pm
Public Works Garage 980 Sunny Acres Road
Attendees:
Stan Jones, Liles Construction
Town Staff:
Patrick Kay, Town Administrator
Jennifer Gilbert, Assistant Town Clerk
Comments Made by Town Administrator:
• The tree that has fallen on the side of the building will be removed prior to
construction beginning.
• Once the tree is removed Spartan Electric will be reinstalling the electric
meter base and upgrading to a 200 amp service
• Garage Doors will need to be cleaned to remove flaking paint prior to painting
(color TBD)
• The cast iron corner guards at the entry to the garage also need to be painted
(color TBD)
• Flood lights on front of building facing outwards to light up the paved lot
where vehicles and equipment are parked; 3 lights should be quoted
• For the security system, the Town has previously worked with MC Sales for
the same cameras that are currently on Town Hall to be installed here.
• One exterior quad outlet should be installed either near the entrance door or
between the two left garage doors.
• 5 quad outlets should be installed in the two left garage bays; two on the rear
wall, two on the north wall, and on between the garage doors.
• New ceiling pendant lighting; Quote to replace the lighting if necessary but
we can look at possibly changing the bulbs to see if it will be bright enough.
• To tap fee from Spartanburg Water for the sewer connection will be $6,000
• Contractor will be responsible for all plumbing connections
• To access the sewer line, the Town will be responsible for easement through
the adjacent property
• In the storage areas in the back of the building there will need to be new
lighting and electrical. This will include two in the larger storage area and one
each in the smaller storage closets.
Questions & Answers:
o Will all 12 lights be replaced including the two bays leased do a different
occupant?
▪ Yes, and also add two additional new lights of the same type to the upper
mezzanine storage area
o (There is a brace under the stairs that was broken.) Will we be quoting to fix the
staircase or replace it?
▪ Upon your review, if it passes code, you could just repair what’s needed.
However, if this would not pass inspection, the entire staircase would
need to be rebuilt.
o Will the ceiling trusses need to be painted?
▪ No, just fix the holes in the ceiling and ensure that it does not leak.
o Will we need to pull permits?
▪ Yes, permits will be needed for proper inspections, but the Town would
take care of the cost of those. A business license will also be needed, if a
company does not already have it
o What is the size of the sewer main?
▪ You would have to contact Spartanburg Water for that information.
o Is there only one bathroom in the building?
▪ Yes with two stalls, urinal and sink
o Will the exterior door need to be replaced with a metal door?
▪ Yes that is also rated as an exterior insulated door as the first room will be
heated and cooled
o Will the floors need to be replaced?
▪ No
o Will the storage area need new outlets?
▪ Yes 3 duplex outlets in this room
o Do you want the entire fence replaced?
▪ No, only the motorized gate will need to be added to the fence that is
currently there.
o Do you want key pad access?
▪ For the exterior yes, to enter the gate. To exit, should just be a drive up.
Also an option for in vehicle button or vehicle recognition should be
included