RecordWell Data

Planning Commission Meeting - May 20, 2026

Town of Lexington · Lexington County · meeting of May 20, 2026 · Agendas

Open the original document More from Town of Lexington

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

REGULAR PLANNING COMMISSION MEETING Council Chambers 111 Maiden Lane, Lexington, SC May 20, 2026 If you wish to speak at the meeting, please be sure to sign up in advance. AGENDA 7:30AM BREAKFAST – ELI MACK 8:00AM OPENING STATEMENT INVOCATION PLEDGE OF ALLEGIANCE CALL TO ORDER DELETIONS ON AGENDA APPROVAL OF MINUTES 1. Regular Planning Commission Meeting April 22, 2026 NEW BUSINESS ITEMS 1. A nnexation of Lexington County Tax Map# 005496- 01-031 Located at 186 Zenker Road 2. A merican Leadership Academy Gym & Sports Complex Expansion Located at 105 & 109 Innovation Place 3. Amendment to Approved Traffic Mitigation Plan at Preserves at Cherokee Trail ADJOURNMENT MINUTES TOWN OF LEXINGTON REGULAR PLANNING COMMISSION MEETING April 22, 2026 The Planning Commission met on April 22, 202 6, at 8:00 a.m. in the Council Chambers at Town Hall, 111 Maiden Lane, Lexington, South Carolina . The meeting was attended by Chairman Frank Berry, Vice Chair man Jarrett Harrelson , Commissioners Jamie Fite, Roscoe Caughman, JT Stephenson, Joe Robertston, and Betsy McCall . Commissioners Sammy Hendrix and Brian Amick were absent. A quorum was met. Others in attendance wer e Councilmember Todd Lyle, Planning and Building Director J essica Lybrand, Transportation Director Randy Edwards, Transportation Department Coordinator Rondie Cheathem, Special Funds Manager Vanessa Stoquert, Digital Media Coordinator Michael Tolbert , and Municipal Clerk Laura Hinson. There were no (0) citizens present, and none from the news media. CALL TO ORDER, INVOCATION & PLEDGE: Chairman Berry called the meeting to order and welcomed those in attendance, noting the meeting was available for public viewing on the Town of Lexington YouTube channel. He reminded speakers to sign up for agenda items before the meeting and to indicate their residency status. Planning Commission members introduced themselves, Chair Berry offered the invocation, and all joined in the Pledge of Allegiance. DELETIONS TO AGENDA: None APPROVAL OF MINUTES: Vice Chair Harrelson made a motion to approve the minutes as submitted for the March 17, 2026, Planning work session and the regular Planning Commission meeting on March 18, 2026. Commissioner Fite seconded the approval. The motion carried unanimously. 7 in favor/ 0 opposed/ 2 absent NEW BUSINESS ITEMS: 1. Development Impact Fee Update-Phase 2- Ms. Lybrand summarized the requirements of the Impact Fee Ordinance, adopted February 1, 2020, noting it requires a five -year comprehensive review of the Impact Fee Study, Capital Improvements Plan, Housing Affordability Analysis, and Ordinance. She stated that Phase One was adopted by the Council on March 3, 2025, and the transportation component was deferred pending completion of Local Transportation Improvement Plan ( LTIP) 2.0, which is now complete. Phase Two, including transportation, is now before the Commission. Mr. Matt Noonkester, Owner and Founding Principal of City Explained, Inc., presented the proposed update to the Town’s Development Impact Fee Program. He noted that his firm prepared the previous impact fee studies and that this update is primarily driven by the completion of the Transportation Study (Version 2.0). MINUTES REGULAR TOWN PLANNING COMMISSION April 22, 2026 2 He explained that while state law requires review and update of the program every five years, this update is needed to incorporate the completed transportation analysis. Upon adoption, the five-year review cycle will reset all impact fee categories. Although the focus is transportation, all three categories, Parks and Recreation, Municipal Facilities and Services, and Transportation, are being brought forward to align schedules. No fee changes are proposed for Parks or Municipal Facilities; only minor text edits were made. The transportation analysis supports an increase due to identified improvements and rising construction costs, and inflation was factored into those calculations. Mr. Noonkester reviewed the four required documents included in the Commission’s packet: a. Impact Fee Justification Report , including technical appendix (existing conditions, growth projections, and cost calculations). b. Capital Improvements Plan (CIP) identifying eligible projects. c. Housing Affordability Analysis, as required by state law. d. Updated Impact Fee Ordinance, with proposed text amendments highlighted. He explained that impact fees may only be used to expand capacity to serve new growth and cannot fund operations, maintenance, or replacement. Transportation uses an improvement - driven methodology tied to adopted level-of-service standards, with projects identified when thresholds are exceeded. He noted the Town currently applies a 0% discount rate (charging the maximum justifiable fee), which is a policy decision of Council. Sample discount scenarios are included in the report. Mr. Noonkester also highlighted improvements to the CIP format, including individual project sheets for clearer tracking and budgeting. He summarized that while housing costs continue to rise, the impact fee increase represents a relatively small portion of total housing cost, and state law requires only that the analysis be provided. He concluded by stating the proposed amendments primarily update references, unit costs, and effective dates. Following the Planning Commission recommendation, the item will proceed to Council for consideration (full presentation and draft text changes are attached). Chair Berry asked how they go about educating the public, as when people hear impact fees, they sometimes think negatively. He noted that this money is used to make improvements to traffic, which is a main concern for many people. Mr. Noonkester clarified that impact fees apply only to new development and are intended to offset the additional demand new growth places on Town services and infrastructure. He noted that impact fees help reduce the need for broader tax increases by ensu ring that new development contributes toward the cost of expanded capacity. He explained that impact fees are triggered by the issuance of a building permit for new construction. Existing home sales do not generate impact fees because no new permits are issued. However, if an existing resident builds a new home within the community, the new construction is considered an added impact and would be subject to the fee, as another household would ultimately occupy the previously existing home. MINUTES REGULAR TOWN PLANNING COMMISSION April 22, 2026 3 Vice Chair Harrelson noted for the record that this was reviewed thoroughly a year ago and just delayed the transportation portion until the new LTIP 2.0 was updated, and he just wanted to note that for the public. Ms. Lybrand noted it was in December 2024, and all those planning sessions and meetings were online. Mr. Noonkester confirmed that many of the proposed revisions are housekeeping updates to ensure all chapters are current and consistent. Chair Berry confirmed the approval process, noting that the Planning Commission would make a recommendation at this meeting, followed by Town Council consideration in May, which would include two readings and a public hearing. He added that adoption could occur in June, unless the Council elects to delay action. Commissioner Robertson added that, in response to prior comments regarding public education, many of the projects identified in the report align with locations residents commonly cite as traffic concerns. He noted that the listed improvements were identified through traffic analysis and emphasized that, in many cases, there may not be an alternative funding source available for these projects outside of the impact fee. Mr. Noonkester stated that upon receiving the LTIP 2.0 packet, he noted it was approximately 1,000 pages and contained thorough research. Chair Berry asked for confirmation that the project list was prioritized beginning with the locations most in need of improvement and then working downward. Mr. Edwards confirmed that the projects were identified and prioritized, starting with the worst-performing locations based on the analysis. Chair Harrelson made a motion to recommend approval of the development impact fee phase 2. The motion was seconded by Commissioner Fite. The motion carried unanimously, 7 in favor/0 opposed/ 2 absent. There were no other questions or comments. ADJOURNMENT: Chairman Berry noted without objection that the meeting adjourned at 8:25 am Respectfully Submitted, __________________________ Laura Hinson Municipal Clerk APPROVED: ______________________ Chairman Frank Berry FOIA COMPLIANCE – Public notification of this meeting was published, posted, and mailed in compliance with the Freedom of Information Act and the Town of Lexington requirement. NEW BUSINESS #1 TO: Planning Commission FROM: Jessica Lybrand, Director of Planning and Building SUBJECT: Annexation of Lexington County Tax Map##005496-01-031 Located at 186 Zenker Rd DATE: May 20, 2026 ____________________________________________________________________________________ BACKGROUND: Allen H. Gates, Joey H. Gates, Norma J. Taylor, Marty R. Gates, Gary W. Gates, and Bruce M. Gates own approximately 72 acres on Zenker Road and has petitioned to annex the property. Properties in Town near this one are zoned Industrial and Protected Residential. Zenker Road is classified as a Local Road. The property is shown on the Future Land Use Map as an Employment/ Light Industrial Area. The Comprehensive Land Use Plan describes this area as a node intended to accommodate a mix of industrial, office, maker-space, flex-tenant, and storage uses designed to support employment-generating development. These areas are characterized by business activity occurring primarily within buildings, while allowing for limited outdoor storage and loading/manufacturing activities. The applicant is requesting the property be zoned with Protected Residential zoning and Zenker Road should be classified as a Local Road. ____________________________________________________________________________________ ACTION REQUESTED: Recommendation on Annexation and Zoning Classification ____________________________________________________________________________________ L e x in g t o n C o u n t y M a p # 0 0 5 4 9 6 - 0 1 - 0 3 1 R o a d s A r t e r ia l C o lle c t o r L o c a l P a r c e ls C o u n t y B o u n d a r ie s M u n ic ip a lit ie s T o w n o f L e x in g t o n U n in c o r p o r a t e d 5 / 1 3 / 2 0 2 6 , 1 : 3 1 : 1 7 P M 0 0 . 1 0 . 20 . 0 5 m i 0 0 . 2 0 . 40 . 1 k m 1 : 8 , 0 0 0 P r in t e d f r o m L e x in g t o n C o u n t y O n e M a p . L e x in g t o n C o u n t y m a k e s n o w a r r a n t y , r e p r e s e n t a t io n o r g u a r a n t y . . . V ie w t h e f u ll d a t a d is c la im e r a t h t t p s : / / le x - c o . s c . g o v / d e p a r t m e n t s / p la n n in g - g is / g is - NEW BUSINESS #2 TO: Planning Commission FROM: Jessica Lybrand, Director of Planning and Building SUBJECT: American Leadership Academy Gym & Sports Complex Expansion Located at 105 & 109 Innovation Place DATE: May 20, 2026 ____________________________________________________________________________________ BACKGROUND: American Leadership Academy is proposing a Gymnasium, Classroom, & Sports Complex Expansion at 105 & 109 Innovation Place. The expansion would include the addition of an approximately 34,227 square-foot building containing a full -size gymnasium and additional classrooms, a full stadium field with track and bleachers, and the addition of approximately 10,700 linear feet of on-site stacking. The proposed expansion is anticipated to increase the school’s capacity from approximately 1,700 students to 2,600 students. As presented, the project meets all zoning requirements. The project will also appear before the Board of Architectural and Appearance to ensure compliance with applicable architectural and appearance standards. The Traffic Impact Analysis prepared for the proposed American Leadership Academy expansion evaluated existing and projected traffic conditions in the area surrounding the school. Based on the study, the following improvements were recommended: • Geometric modifications at the intersection of Glassmaster Road and Bruner Road to accommodate left-turn movements. • Geometric modifications at the intersection of Glassmaster Road and Bruner Road to improve right-turn movements. • Minor geometric alignment modifications at the intersection of Industrial Drive and South Lake Drive (SC 6) to allow concurrent operation of the existing traffic signal. • Construction of a northbound right-turn lane on South Lake Drive (SC 6) at Innovation Place into the school campus. All improvements are subject to SCDOT review, approval, and standards. Consideration will also be given to dualization of the interior roundabout between the upper school exit and Innovation Place. The Planning Commission should consider the proposed expansion and associated transportation and circulation improvements, including the relocation of vehicle stacking from public roadways to the interior of the site, in its evaluation of this request. ____________________________________________________________________________________ ACTION REQUESTED: Site Plan Approval ____________________________________________________________________________________ LOWER SCHOOL UPPER SCHOOL PROPOSED GYM/ CLASSROOM SOUTH LAKE DRIVE INNOVATION PLACE BRUNER ROAD PROPOSED STADIUM NC FIRM#: C-4911, C-670 v3co.com landscape architecture | planning | civil engineering | surveying ALA LEXINGTON LEXINGTON, SC | DATE: 05.12.2026 | PROJECT NO.: 251016 V3 Companies LEXINGTON CHARTER SCHOOL LEXINGTON, SC | DATE: 05.12.2026 | PROJECT NO.: 251016 RENDERED SITE PLAN N PARKING TABLE CLASSROOMS: TOTAL REQUIRED = 379 SPACES STADIUM: TOTAL REQUIRED = 344 SPACES TOTAL PROVIDED = 404 SPACES o o o o o o o o oooooo o o o o o o o o o o o ooooo o o o o o o o o o xx xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 4'-3" 4'-3" 4'-3" 4'-3" SOUTH LAKE DRIVE90' PUBLIC R/WPER PB 11343, PG 0347 BRUNER RD66' PUBLIC R/WPER PB 10071, PG 0339 INNOVATION PLVARIABLE WIDTH R/WPER MONUMENTATION DETENTION POND DETENTION POND SOUTH LAKE DRIVE90' PUBLIC R/WPER PB 11343, PG 0347 ZONE B STACKING 3095' ZONE A STACKING 7660' BRUNER ROAD ENTRANCE VISITOR/STAFF PARKING STAFF/STUDENT PARKING INNOVATION EAST ENTRANCE INNOVATION NORTH ENTRANCE CONES PLACED TO BLOCK DRIVERSFROM BYPASSING THE QUEUE CROSSWALKCONTROLLEDBY STAFF ZONE BSINGLE LANE7-BAY LOADING ZONE ASINGLE LANE 7-BAY LOADING STAFF TO ENSURE ZONE AEXIT LANE REMAINS CLEAR LOWERSCHOOLBUILDINGUPPERSCHOOLBUILDING GYMNASIUM/CLASSROOMBUILDING BUS LOADING TRAFFICMANAGEMENT PLANEARLY BELL ALA LEXINGTON N:\2025\251016\Drawings\Exhibit Drawings\251016-EXHIBIT-STACKING.dwg, 5/8/2026 12:17:01 PM, jamie sherer, Sheet Size 11x17, V3 Companies V3 COMPANIES 656 South Main StreetSuite 320Greenville, SC 29601www.v3co.com CLIENT: LEXINGTON, SC1" = 200' 0 100 200200 N DATE:05.08.2026 AM OPERATIONS:·There is a 45-minute staggered bell schedule between lower school (K-5) and upperschool (6-12).··Early bell schedule starts at 7:40 AM··Late bell schedule starts at 8:25 AM·Both designated drop-off/pick-up zones are used for both bell schedules to assurethere is enough stacking on site. PM OPERATIONS:·There is a 45-minute staggered bell schedule for the afternoon operations betweenlower school (K-5) and upper school (6-12).··Early bell schedule starts at 2:40··Late bell schedule starts at 3:25.·Both designated drop-off/pick-up zones are used for both bell schedules to assurethere is enough stacking on site. DROP-OFF ZONE PROCEDURES:·There are two designated drop-off/pick-up zones.··Zone A drop off is at the lower school (K-5) building.··Zone B drop off is at the upper school (6-12) building.·Cars enter the drop-off/pick-up Zones A & B.·All students exit/enter cars on the right side of the vehicles adjacent to the school andnext to the curb. These platoons are in groups of 7 cars.·Staff members monitor these operations at Zone A, Zone B, and crosswalks to assuresafety. No loading or unloading is allowed until all cars come to a complete stop indesignated drop-off/pick-up zones.EARLY BELL ZONE A EARLY BELL ZONE B LATE BELL ZONE A LATE BELL ZONE B OPERATIONAL NOTES BUS LOOP o o o o o o o o oooooo o o o o o o o o o o o ooooo o o o o o o o o o xx xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 4'-3" 4'-3" 4'-3" 4'-3" BUILDING BUILDING SOUTH LAKE DRIVE90' PUBLIC R/WPER PB 11343, PG 0347 BRUNER RD66' PUBLIC R/WPER PB 10071, PG 0339 INNOVATION PLVARIABLE WIDTH R/WPER MONUMENTATION DETENTION POND DETENTION POND SOUTH LAKE DRIVE90' PUBLIC R/WPER PB 11343, PG 0347 ZONE B STACKING 3095' ZONE A STACKING 7660' BRUNER ROAD ENTRANCE VISITOR/STAFF PARKING STAFF/STUDENT PARKING INNOVATION EAST ENTRANCE INNOVATION NORTH ENTRANCE CONES PLACED TO BLOCK DRIVERSFROM BYPASSING THE QUEUE CROSSWALKCONTROLLEDBY STAFF ZONE BSINGLE LANE7-BAY LOADING ZONE ASINGLE LANE 7-BAY LOADING STAFF TO ENSURE ZONE AEXIT LANE REMAINS CLEAR LOWERSCHOOLBUILDINGUPPERSCHOOLBUILDING GYMNASIUM/CLASSROOMBUILDING BUS LOADING TRAFFICMANAGEMENT PLANLATE BELL ALA LEXINGTON N:\2025\251016\Drawings\Exhibit Drawings\251016-EXHIBIT-STACKING.dwg, 5/8/2026 12:17:03 PM, jamie sherer, Sheet Size 11x17, V3 Companies V3 COMPANIES 656 South Main StreetSuite 320Greenville, SC 29601www.v3co.com CLIENT: LEXINGTON, SC1" = 200' 0 100 200200 N DATE:05.08.2026 AM OPERATIONS:·There is a 45-minute staggered bell schedule between lower school (K-5) and upperschool (6-12).··Early bell schedule starts at 7:40 AM··Late bell schedule starts at 8:25 AM·Both designated drop-off/pick-up zones are used for both bell schedules to assurethere is enough stacking on site. PM OPERATIONS:·There is a 45-minute staggered bell schedule for the afternoon operations betweenlower school (K-5) and upper school (6-12).··Early bell schedule starts at 2:40··Late bell schedule starts at 3:25.·Both designated drop-off/pick-up zones are used for both bell schedules to assurethere is enough stacking on site. DROP-OFF ZONE PROCEDURES:·There are two designated drop-off/pick-up zones.··Zone A drop off is at the lower school (K-5) building.··Zone B drop off is at the upper school (6-12) building.·Cars enter the drop-off/pick-up Zones A & B.·All students exit/enter cars on the right side of the vehicles adjacent to the school andnext to the curb. These platoons are in groups of 7 cars.·Staff members monitor these operations at Zone A, Zone B, and crosswalks to assuresafety. No loading or unloading is allowed until all cars come to a complete stop indesignated drop-off/pick-up zones.EARLY BELL ZONE A EARLY BELL ZONE B LATE BELL ZONE A LATE BELL ZONE B OPERATIONAL NOTES BUS LOOP Prepared for Way Construction Traffic Impact Analysis American Leadership Academy Charter School Lexington, South Carolina Prepared By: Craig D. Nelson, PE | Traffic Engineer craig.nelson@ice-eng.com 5/5/2026 Traffic Impact Analysis ALA Charter School Lexingt on 1 Contents EXECUTIVE SUMMARY .................................................................................................................................... 2 INTRODUCTION ............................................................................................................................................... 3 EXISTING CONDITIONS .................................................................................................................................... 3 FIGURE 1- SITE LOCATION AND STUDY AREA ...................................................................................................... 5 FIGURE 2 – PROPOSED SITE PLAN .................................................................................................................... 6 TRANSPORTATION SYSTEM ANALYSIS ............................................................................................................ 7 DATA COLLECTION .......................................................................................................................................... 7 TRAFFIC CONDITIONS ...................................................................................................................................... 7 FIGURE 3 -- 2026 EXISTING PEAK HOUR TRAFFIC VOLUMES ................................................................................. 8 FIGURE 4 -- 2028 BACKGROUND PEAK HOUR TRAFFIC VOLUMES .......................................................................... 9 PROPOSED DEVELOPMENT ............................................................................................................................ 10 TRIP GENERATION ....................................................................................................................................... 10 SITE TRIPS .................................................................................................................................................. 10 FIGURE 5 – SITE TRIPS PERCENT DISTRIBUTION ................................................................................................. 11 FIGURE 6 – SITE TRIPS ................................................................................................................................. 12 FIGURE 7 – 2028 BUILD CONDITIONS – PEAK HOUR TRAFFIC VOLUMES ............................................................... 13 TRAFFIC ANALYSIS......................................................................................................................................... 14 TURN LANE ANALYSIS ................................................................................................................................... 16 FINDINGS AND CONCLUSIONS ...................................................................................................................... 16 RECOMMENDATIONS.................................................................................................................................... 17 APPENDICES .................................................................................................................................................. 18 Traffic Impact Analysis ALA Charter School Lexingt on 2 Executive Summary A Traffic Impact Analysis (TIA) was performed for a proposed addition to the American Leadership Academy Charter School on the east side of SC 6 (S Lake Road) north of its intersection with Industrial Drive/Glassmaster Road (S-626) in Lexington, South Carolina. Proposed land use for the site includes a Charter S chool (K-12) with a capacity of 2600 Students; existing student population was assumed t o be 1674 based on actual attendance when traffic counts were obtained for the study, resulting in 926 additional students. Traffic to and from the site will use the existing access on SC 6 (S Lake Road) via Innovation Place approximately 700 feet north of Industrial Dr ive/Glassmaster Road (S-626), and the existing School Access on Bruner Road approximately 300 feet east of Glassmaster Road (S- 626). Study intersections included SC 6 (S Lake Road) at Industrial Drive/Glassmaster Road (S-626), Glassmaster Road (S-626)/Bruner Road at Glassmaster Road (S-626), Bruner Road at School Access, and SC 6 (S Lake Road) at Innovation Place. Growth projections were made using the SCDOT AADT w ebsite, and a 1.48% annual background traffic growth rate was assumed for the Build year (2028). It was found that in the 2028 Build scenario, the d elays and levels of service (LOS) for the southbound School Access approach to Bruner Road wo uld remain favorable for the proposed expansion during the AM and PM drop-off/pick-up peak hours. For the remaining study intersections, due to the i ncreased school traffic, increases in delay were noted based on capacity analysis. The interse ctions were also evaluated to determine if turn lanes are recommended based on SCDOT guidelines. The recommendations include: • Coordinate with the Town of Lexington for the possi ble widening of Bruner Road between Glassmaster Road (S-626) and the School Acc ess to accommodate an exclusive left turn lane into Glassmaster Road (S-6 26) which would include a full 3- lane pavement width between the intersections. • Consider the feasibility of widening Industrial Drive (S-626) at SC 6 (S Lake Rd) adjacent to the Whataburger property to accommodate an addit ional lane on Industrial Drive (S-626), allowing for separate left-, through-, and right-turn lanes on the eastbound approach. The additional lane would enable a chang e in the operation of the traffic signal from the current split phase operation to co ncurrent side street through movements, improving efficiency. • Consider the construction of a northbound right tur n lane on SC 6 (S Lake Road) at Innovation Place to accommodate school traffic. • Continue to prohibit left-turns out of the School Access as well as right-turns into the School Access at Bruner Road during drop-off/pick-up peak hours. The study concludes that the public roadway system serving the site can accommodate the anticipated traffic volumes generated by the propos ed development with consideration of the mitigation measures analyzed. Traffic Impact Analysis ALA Charter School Lexingt on 3 Introduction This report summarizes the results of a traffic stu dy conducted by Infrastructure Consulting & Engineering, LLC (ICE) in connection with a propo sed addition to the American Leadership Academy Charter School on the east side of SC 6 (S Lake Road) north of its intersection with Industrial Drive/Glassmaster Road (S-626) in Lexing ton, South Carolina. Proposed land use for the site includes a Charter School (K-12) with a capacity of 2600 Students; existing student population was assumed to be 1674 based on actual a ttendance when traffic counts were obtained for the study. The proposed expansion is anticipated to be complet e in 2027, with a horizon year for the Build analysis of 2028 (completion year plus one). The Site Location and Study Area are illustrated in Figure 1, and the Site Plan is presented in Figure 2. The purpose of this study is to determine the traff ic impacts of the proposed expansion on the adjacent roadway system and the study intersections in the vicinity of the project site . Existing Conditions The land use near the study area is a mix of indust rial, commercial, retail, residential, and school. The school expansion will take place on the existing school site. Regional access to the project site is provided by I-20 and SC 6 (S Lake Road), and direct access to the site is proposed to be provided by the exist ing accesses via SC 6 (S Lake Road) at Innovation Place, and via the School Access at Brun er Road. I-20 is an east-west interstate highway in the southern United States connecting Re eves County, Texas to I-95 in Florence, South Carolina. SC 6 is a generally northwest-sout heast highway running from US 76 in Ballentine to US 52 in Moncks Corner. Bruner Road i s a short east-west town-maintained road, intersecting with Glassmaster Road (S-626) ap proximately 300 feet west of the School Access, and dead-ending about 2500 feet to the east. SC 6 (S Lake Road) is a five-lane highway with a po sted speed limit of 45 mph (See Table 1). Industrial Drive (S-626) is a two-lane roadway with a posted speed limit of 45 mph. Glassmaster Road (S-626) is a two-lane roadway with an assumed speed limit of 30 mph. Bruner Road is a two-lane roadway with an assumed s peed limit of 30 mph. The proposed project site spans approximately 890 feet along SC 6 (S Lake Rd) and 160 feet along Bruner Road. Study intersections included SC 6 (S Lake Road) at Industrial Drive/Glassmaster Road (S-626), Glassmaster Road (S-626)/Bruner Road at Glassmaster Road (S-626), Bruner Road at School Access, and SC 6 (S Lake Road) at Innovation Place. Traffic Impact Analysis ALA Charter School Lexingt on 4 The roadway classification is summarized in Table 1 below: Table 1 Roadway Classifications American Leadership Academy Charter School, Lexington SC TIA Roadway Classification Speed Limit SC 6 (S Lake Rd) Urban-Minor Arterial 45 mph Industrial Drive (S-626) Urban-Major Collector 45 mph Glassmaster Road (S-626) Urban-Local 30 mph (assumed) Bruner Road Urban-Local 30 mph (assumed) Traffic Impact Analysis ALA Charter School Lexingt on 7 Transportation System Analysis Street System Improvements: As per the SCDOT Project Viewer, no projects are pl anned in the immediate area. Pedestrian Access: It was observed that there are existing sidewalks, crosswalks, and pedestrian signals at the intersection of SC 6 (S L ake Road) at Industrial Drive/Glassmaster Road (S-626). There is a sidewalk on each side of SC 6 (S Lake Road) south of Innovation Place, and a sidewalk on the west side of SC 6 (S Lake Roa d) north of Innovation Place. A sidewalk is in place on the south side of Innovation Place. There are no existing sidewalks at the remaining study intersections. Bicycle Access: Currently, there are no bikeways in the vicinity of the project site. Based upon review and research there are no plans for future bikeways in this area. Transit Service: There are no bus routes in the immediate vicinity of the project site. On-Street Parking: On-street parking is not present in the vicinity of the project site. Data Collection The AM and PM peak period turning movement counts f or the study intersections were conducted by Short Counts, LLC on March 3, 2026, an d March 10, 2026. AM and PM peak hour turning movement counts are summarized in Figure 3. Additionally, AADT counts are available on the SCDO T Traffic Data and Analysis Web site for Site ID 32-0711, Description S-132 : SC 6 (S LAKE D R) TO S- 337 (SWARTZ RD); Site ID 32- 0467, Description S-626 : S- 1448 (ZENKER RD) TO SC 6 (S LAKE DR); Site ID 32- 0219, Description SC6 : L- 1657 (MAIDEN LN) TO I- 2 0 (INTERSTATE 20); and Site ID 32- 0693, Description S-337 : US 1 (E MAIN ST) TO SC 6 (S LAKE DR). The reports of the traffic counts conducted for this project are presented in Appendix B. Traffic Conditions Base future growth analysis was derived from SCDOT’ s Traffic Analysis and Data Application website using the available SCDOT count stations ne ar the site. Using AADT years 2015 through 2024, a 1.48% weighted average growth rate was calculated. The 1.48% growth rate was applied to existing volumes to obtain a horizon year of 2028 (completion year of 2027 plus one year) to establish the 2028 Background traffic model. The 2026 Existing AM and PM peak hour turning movem ent volumes are summarized in Figure 3. The resulting 2028 Background AM and PM peak hour turning movement volumes are summarized in Figure 4. Intersection reports in Appendix C show the turning movement volumes for the Existing, Background, and Build conditions. Traffic Impact Analysis ALA Charter School Lexingt on 10 Proposed Development As presented in the Site Plan (Figure 2), the new U pper School Building will be built on the existing site on the east side of SC 6 (S Lake Road ) north of its intersection with Industrial Drive/Glassmaster Road (S-626). Proposed land use for the site includes a Charter School (K- 12) with a capacity of 2600 Students; existing stud ent population was assumed to be 1674 based on actual attendance when traffic counts were obtained for the study. Traffic to and from the site will use the existing access on SC 6 (S Lake Road) via Innovation Place approximately 700 feet north of Industrial Dr ive/Glassmaster Road (S-626), and the existing School Access on Bruner Road approximately 300 feet east of Glassmaster Road (S- 626). Trip Generation Trips to and from the proposed expansion were estim ated using the Institute of Transportation Engineers’ Trip Generation Manual, 1 2th Edition. ITE Land Use 538 – Charter School (K-12) was compared with the actual rate counted for the peak hour of the generator in the AM and PM peak hours. Existing actual rates were chosen in coordination with SCDOT to calculate expected new trips from the expansion. The results of the trip generation analysis are summarized in Table 2, and printed reports from the spreadsheet of the calculations are included in Appendix B. Site Trips Based on the observed traffic patterns in the vicinity of the site, trip distribution was developed for the new site trips during the AM and PM peak hours. The trip distribution with trip assignment percentages and net new trips are illustrated in Figures 5 and 6. The site generated traffic was added to 2028 Background traffic to determine turning movement volumes for the analysis intersections in the AM and PM peak hours for the 2028 Build conditions, shown in Figure 7. Table 2 Trip Generation Analysis American Leadership Academy Charter School, Lexington SC TIA Land Use Independent Variable AM Peak Hour Trips PM Peak Hour Trips Entry Exit Entry Exit Charter School (K-12) – ITE Land Use – 538 Students (926) 544 348 255 382 891 637 Traffic Impact Analysis ALA Charter School Lexingt on 14 Traffic Analysis Intersection Level of Service (LOS) analyses were p erformed in accordance with the procedures set forth and recommended by the Highway Capacity Manual (HCM) Level of Service methodologies for evaluation of signalized and unsignalized intersections. Traffic analysis software Synchro was used to evaluate the operation of the study intersections . The Level of Service criteria for signalized and unsignalized intersections are listed below in Table 3. LOS ‘A’ is considered the best free-flow conditi ons and LOS ‘F’ is considered failing conditions. LOS ‘D’ is considered acceptable during the peak hours by most agencies. Table 3 Level of Service (LOS) Criteria for Intersections American Leadership Academy Charter School, Lexington SC TIA LOS Signalized Intersection Unsignalized Intersections Delay (sec/veh) Delay (sec/veh) A 0-10 0-10 B >10-20 >10-15 C >20-35 >15-25 D >35-55 >25-35 E >55-80 >35-50 F >80 >50 Using the traffic volumes for the Existing, Background, and Build conditions, the AM and PM peak hour levels of service for the study intersect ions were determined, and they are summarized in Tables 4 and 5. Detailed levels of service reports are included in Appendix C. Traffic Impact Analysis ALA Charter School Lexingt on 15 Table 4 Intersection Level of Service and Delay American Leadership Academy Charter School, Lexington SC TIA Intersection Approach LOS/Delay (seconds) 2026 Existing Conditions 2028 Background Conditions 2028 Build Conditions 2028 Build Conditions with Mitigation SC 6 (S Lake Rd) at Industrial Dr/Glassmaster Rd (S-626) 1 S-626 EB Lt AM D/37.6 D/39.9 F/110.4 C/30.0 PM D/38.2 D/39.8 D/49.5 C/26.7 S-626 EB Th AM D/37.6 D/39.9 F/110.4 E/ 60 .2 PM D/38.2 D/39.8 D/49.5 D/ 39 .4 S-626 EB Rt AM C/32.9 C/34.7 D/4 3.8 E/ 64.1 PM C/31.3 C/32.6 D/36.1 D/36. 2 S-626 WB Lt AM D/40.6 D/41.7 E/55.6 D/35.9 PM D/44.9 D/47.4 E/58.2 C/29.5 S-626 WB Rt Th AM D/40.0 D/40.6 D/ 54.0 D/3 9.0 PM D/41.5 D/42.9 D/47.5 C/34.0 SC 6 NB Lt AM C/24.3 C/25.5 C/2 8.5 C/22.3 PM C/32.3 D/37.0 D/45.4 D/ 39.0 SC 6 NB Th AM C/33.1 C/ 34.5 D/4 5.4 D/36.3 PM C/25.5 C/26.4 C/31.2 C/31. 6 SC 6 NB Rt AM B/19.6 B/19.9 D/41.1 D/3 7.8 PM B/12.6 B/12.7 B/14.0 B/14. 7 SC 6 SB Lt AM C/24.4 C/25.6 F/105.2 D/ 50.2 PM B/19.7 C/20.5 C/24.9 C/25.5 SC 6 SB Th Rt AM C/33.2 C/34.3 D/36.8 C/29.8 PM D/41.1 D/44.6 D/52.3 D/5 0.9 Overall AM C/31.9 C/33.1 D/ 52.3 D/ 39.1 PM C/33.3 D/35.5 D/41.6 D/ 35.6 Glassmaster Rd (S-626) at Bruner Rd 2 S-626 NB Lt3 AM D/28.3 C/24.8 F/ 144.0 F/ 137 .5 PM C/16.2 C/16.8 E/40.0 E/ 43 .1 S-626 NB Rt3 AM D/28.3 C/24.8 F/ 144 .0 C/21.6 PM C/16.2 C/16.8 E/40.0 B/12.1 Bruner Rd WB Lt 4 AM A/9.5 A/9. 1 B/11. 4 B/11. 4 PM A/8.2 A/8.2 A/8. 8 A/8. 8 Bruner Rd at School Access 2 Bruner Rd EB Lt 4 AM A/9.3 A/ 8.8 B/1 2.7 B/1 2.7 PM A/7.9 A/7.9 A/8.6 A/8. 5 School Access SB Lt 3 AM F/638.7 - - - PM B/11.4 - - - School Access SB Rt3 AM F/638.7 B/11.0 B/14.6 B/14.6 PM B/11.4 B/11.6 C/16.5 C/15. 8 SC6 (S Lake Rd) at Innovation Pl 2 Innovation Pl WB Lt 3 AM E/36.3 E/3 9.5 F/86 .8 F/70 .7 PM D/34.3 E/36.8 F/56. 5 F/55.9 Innovation Pl WB Rt3 AM C/20.4 C/2 1.7 E/4 4.7 D/29.9 PM C/17.6 C/18.4 D/25.4 C/23.0 SC 6 SB Lt 4 AM B/11.8 B/12.0 B/13. 5 B/13. 5 PM B/11.1 B/11.3 B/12.0 B/1 1.9 1 Traffic Signal 2 Two-Way Stop Control 3 LOS/Delay for minor street approach 4LOS/Delay for major street left turn movement Traffic Impact Analysis ALA Charter School Lexingt on 16 Turn Lane Analysis The SCDOT Roadway Design Manual Chapter 9 turn lane requirements were reviewed for the study area intersections. Graphs showing the results for each uncontrolled intersection approach can be found in Appendix D. For the signalized intersection and stop controlled approaches, turn lane needs are based on capacity analysis. At the intersection of Bruner Road and Glassmaster Road (S-626), a left turn lane on Bruner Road should be considered. The left turn lane was included in the traffic analysis for the Build conditions with Mitigation, along with an added left turn lane on the stop-controlled approach for comparison. The graph of the Build traffic volumes on Bruner Road at the School Access showed that a left turn lane is not necessary. For the northbound approach on SC 6 (S Lake Road) at Innovation Pl, a check of Figure 9.5-B in the SCDOT Roadway Design Manual shows that a right turn lane should be considered. Although the graph is noted to be only applicable on highways with a design speed of 50 miles per hour or greater, due to the high turning volume and through volume, consideration of a northbound right turn lane is recommended. The intersection of SC 6 (S Lake Road) at Industrial Drive/Glassmaster Road (S-626) was reviewed with an additional eastbound lane to accommodate exclusive left turns, an exclusive through lane, and an exclusive right turn lane in the eastbound direction for the Mitigated Build conditions. This change allows the signal to be operated with concurrent side street through movements which would improve efficiency. Findings and Conclusions At the intersection of SC 6 (S Lake Road) at Indust rial Drive/Glassmaster Road (S-626), LOS C overall is experienced in the AM 2028 Background pe ak hour, and LOS D overall in the PM 2028 Background peak hour. In the 2028 Build condi tions, LOS D overall is experienced in both the AM peak hour and the PM peak hour. In the 2028 Mitigated Build conditions, overall delay improved by more than 13 seconds in the AM pe ak hour, and improved by 6 seconds in the PM peak hour as compared with the unmitigated 2028 Build conditions. The single-lane northbound approach of Glassmaster Road (S-626) to Bruner Road would experience LOS F during the AM peak hour in the 202 8 Build conditions. If an exclusive left turn lane was added on Bruner Road and on the stop- controlled approach of Glassmaster Road (S-626), the LOS on the stop-controlled approa ch would improve to LOS C for the right turn movement and would remain LOS F for the left t urn movement during the AM peak hour. During the PM peak hour, the LOS on the stop-controlled approach would be LOS B for the right turn movement and LOS E for the left turn movement. It was found that School Access has a poor level of service (LOS) of F for the southbound approach to Bruner Road during the Existing AM peak hour. Since the counts were taken, ALA Charter School implemented a new traffic pattern wh ere traffic on the School Access approach was restricted to Right Turn Only during s chool arrival and dismissal times. With the elimination of the left turns out of the School Access (and the elimination of right turns into the School Access), the LOS on the School Acce ss approach improved from LOS F during the AM peak hour in Existing conditions, to LOS C o r better in all Background and Build conditions. Traffic Impact Analysis ALA Charter School Lexingt on 17 At the intersection of SC 6 (S Lake Road) at Innova tion Pl, LOS F is experienced for the left turn approach on Innovation Pl in the 2028 Build co nditions AM peak hour and in the PM peak hour. Right turns from Innovation Pl will exp erience LOS E during the 2028 Build conditions AM peak hour. During the 2028 Build con ditions PM peak hour, right turns from Innovation Pl would experience LOS D. The 2028 Mitigated Build conditions would include a northbound right turn lane and would slightly impro ve the delay for the left turn from Innovation Pl during the AM and PM peak hours, and the right turn from Innovation Pl would be LOS D or better during both peak hours. Recommendations After consideration of the traffic analysis of the American Leadership Academy (ALA) Charter School Expansion on SC 6 (S Lake Road) and Bruner Road, the following is recommended: • Coordinate with the Town of Lexington for the possi ble widening of Bruner Road between Glassmaster Road (S-626) and the School Acc ess to accommodate an exclusive left turn lane into Glassmaster Road (S-6 26) which would include a full 3- lane pavement width between the intersections. • Consider the feasibility of widening Industrial Drive (S-626) at SC 6 (S Lake Rd) adjacent to the Whataburger property to accommodate an addit ional lane on Industrial Drive (S-626), allowing for separate left-, through-, and right-turn lanes on the eastbound approach. The additional lane would enable a chang e in the operation of the traffic signal from the current split phase operation to co ncurrent side street through movements, improving efficiency. • Consider the construction of a northbound right tur n lane on SC 6 (S Lake Road) at Innovation Pl to accommodate school traffic. • Continue to prohibit left-turns out of the School Access as well as right-turns into the School Access at Bruner Road during drop-off/pick-up peak hours. The study concludes that the public roadway system serving the site can accommodate the anticipated traffic volumes generated by the propos ed development with consideration of the mitigation measures analyzed. Traffic Impact Analysis ALA Charter School Lexingt on 18 Appendices Appendix A Site Photographs Appendix B Traffic Counts and Trip Generation Appendix C Intersection Reports Appendix D Turn Lane Graphs Appendix A Site Photographs SC 6 at S-626 looking north SC 6 at S-626 looking east SC 6 at S-626 looking south SC 6 at S-626 looking west Bruner Rd at Glassmaster Rd looking north Bruner Rd at Glassmaster Rd looking east Bruner Rd at Glassmaster Rd looking south Bruner Rd at Glassmaster Rd looking west Bruner Rd at School Access looking north Bruner Rd at School Access looking east Bruner Rd at School Access looking south Bruner Rd at School Access looking west SC 6 at Innovation Pl looking north SC 6 at Innovation Pl looking east SC 6 at Innovation Pl looking south SC 6 at Innovation Pl looking west Appendix B Traffic Counts and Trip Generation File Name : SC 6 @ Glassmaster-Industrial Dr Site Code : Start Date : 03/03/2026 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses SC 6 Southbound Glassmaster Rd Westbound SC 6 Northbound Industrial Dr Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 26 108 12 0 29 19 6 0 62 199 79 0 19 24 95 0 678 07:15 46 130 4 0 96 34 9 0 57 178 139 0 29 28 95 0 845 07:30 38 147 13 0 73 28 11 0 52 227 114 0 24 32 76 0 835 07:45 17 151 13 0 75 25 6 0 64 242 85 0 18 25 86 0 807 Total 127 536 42 0 273 106 32 0 235 846 417 0 90 109 352 0 3165 08:00 28 145 11 0 93 28 14 0 50 206 65 0 23 39 84 0 786 08:15 19 171 8 0 86 25 11 0 50 248 56 0 26 23 59 0 782 08:30 12 159 8 0 39 23 8 1 46 231 9 0 17 18 55 0 626 08:45 14 130 6 0 41 16 11 0 39 209 10 0 16 15 65 0 572 Total 73 605 33 0 259 92 44 1 185 894 140 0 82 95 263 0 2766 14:00 14 185 15 0 38 12 6 0 59 228 35 0 9 13 58 0 672 14:15 13 200 6 0 27 13 5 0 58 158 46 0 15 16 54 0 611 14:30 32 194 8 0 51 19 11 1 57 189 47 0 21 19 46 1 696 14:45 21 213 11 0 104 25 9 0 54 221 71 0 21 16 44 0 810 Total 80 792 40 0 220 69 31 1 228 796 199 0 66 64 202 1 2789 15:00 16 228 8 0 55 16 11 0 51 196 28 0 29 16 60 0 714 15:15 17 204 13 0 57 15 10 0 60 199 41 0 25 10 57 0 708 15:30 19 213 12 0 117 29 12 0 65 245 53 0 26 19 95 0 905 15:45 10 227 9 0 105 26 11 0 64 213 16 0 24 8 68 0 781 Total 62 872 42 0 334 86 44 0 240 853 138 0 104 53 280 0 3108 Grand Total 342 2805 157 0 1086 353 151 2 888 3389 894 0 342 321 1097 1 11828 Apprch % 10.4 84.9 4.8 0 68.2 22.2 9.5 0.1 17.2 65.5 17.3 0 19.4 18.2 62.3 0.1 Total % 2.9 23.7 1.3 0 9.2 3 1.3 0 7.5 28.7 7.6 0 2.9 2.7 9.3 0 Passenger Vehicles 329 2736 152 0 1020 325 137 2 828 3317 873 0 318 308 1037 1 11383 % Passenger Vehicles 96.2 97.5 96.8 0 93.9 92.1 90.7 100 93.2 97.9 97.7 0 93 96 94.5 100 96.2 Heavy Vehicles 12 40 3 0 64 26 12 0 60 55 21 0 20 13 58 0 384 % Heavy Vehicles 3.5 1.4 1.9 0 5.9 7.4 7.9 0 6.8 1.6 2.3 0 5.8 4 5.3 0 3.2 Buses 1 29 2 0 2 2 2 0 0 17 0 0 4 0 2 0 61 % Buses 0.3 1 1.3 0 0.2 0.6 1.3 0 0 0.5 0 0 1.2 0 0.2 0 0.5 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : SC 6 @ Glassmaster-Industrial Dr Site Code : Start Date : 03/03/2026 Page No : 2 SC 6 Industrial Dr Glassmaster Rd SC 6 Right 152 3 2 157 Thru 2736 40 29 2805 Left 329 12 1 342 Peds 0 0 0 0 InOut Total 3772 3217 6989 87 55 142 23 32 55 3882 7186 3304 Right 137 12 2 151 Thru 325 26 2 353 Left 1020 64 2 1086 Peds 2 0 0 2 OutTotal In 1510 1484 2994 46 102 148 1 6 7 1557 3149 1592 Left 828 60 0 888 Thru 3317 55 17 3389 Right 873 21 0 894 Peds 0 0 0 0 Out TotalIn 4793 5018 9811 162 136 298 33 17 50 4988 10159 5171 Left 318 20 4 342 Thru 308 13 0 321 Right 1037 58 2 1097 Peds 1 0 0 1 TotalOut In 1305 1664 2969 89 91 180 4 6 10 1398 3159 1761 03/03/2026 07:00 03/03/2026 15:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : SC 6 @ Glassmaster-Industrial Dr Site Code : Start Date : 03/03/2026 Page No : 3 SC 6 Southbound Glassmaster Rd Westbound SC 6 Northbound Industrial Dr Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 46 130 4 0 180 96 34 9 0 139 57 178 139 0 374 29 28 95 0 152 845 07:30 38 147 13 0 198 73 28 11 0 112 52 227 114 0 393 24 32 76 0 132 835 07:45 17 151 13 0 181 75 25 6 0 106 64 242 85 0 391 18 25 86 0 129 807 08:00 28 145 11 0 184 93 28 14 0 135 50 206 65 0 321 23 39 84 0 146 786 Total Volume 129 573 41 0 743 337 115 40 0 492 223 853 403 0 1479 94 124 341 0 559 3273 % App. Total 17.4 77.1 5.5 0 68.5 23.4 8.1 0 15.1 57.7 27.2 0 16.8 22.2 61 0 PHF .701 .949 .788 .000 .938 .878 .846 .714 .000 .885 .871 .881 .725 .000 .941 .810 .795 .897 .000 .919 .968 Passenger Vehicles 125 558 40 0 723 315 108 35 0 458 207 838 400 0 1445 82 122 321 0 525 3151 % Passenger Vehicles Heavy Vehicles 4 9 1 0 14 22 7 4 0 33 16 14 3 0 33 9 2 20 0 31 111 % Heavy Vehicles 3.1 1.6 2.4 0 1.9 6.5 6.1 10.0 0 6.7 7.2 1.6 0.7 0 2.2 9.6 1.6 5.9 0 5.5 3.4 Buses 0 6 0 0 6 0 0 1 0 1 0 1 0 0 1 3 0 0 0 3 11 % Buses 0 1.0 0 0 0.8 0 0 2.5 0 0.2 0 0.1 0 0 0.1 3.2 0 0 0 0.5 0.3 SC 6 Industrial Dr Glassmaster Rd SC 6 Right 40 1 0 41 Thru 558 9 6 573 Left 125 4 0 129 Peds 0 0 0 0 InOut Total 955 723 1678 27 14 41 5 6 11 987 1730 743 Right 35 4 1 40 Thru 108 7 0 115 Left 315 22 0 337 Peds 0 0 0 0 OutTotal In 647 458 1105 9 33 42 0 1 1 656 1148 492 Left 207 16 0 223 Thru 838 14 1 853 Right 400 3 0 403 Peds 0 0 0 0 Out TotalIn 1194 1445 2639 51 33 84 6 1 7 1251 2730 1479 Left 82 9 3 94 Thru 122 2 0 124 Right 321 20 0 341 Peds 0 0 0 0 TotalOut In 355 525 880 24 31 55 0 3 3 379 938 559 Peak Hour Begins at 07:15 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : SC 6 @ Glassmaster-Industrial Dr Site Code : Start Date : 03/03/2026 Page No : 4 SC 6 Southbound Glassmaster Rd Westbound SC 6 Northbound Industrial Dr Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 14:45 14:45 21 213 11 0 245 104 25 9 0 138 54 221 71 0 346 21 16 44 0 81 810 15:00 16 228 8 0 252 55 16 11 0 82 51 196 28 0 275 29 16 60 0 105 714 15:15 17 204 13 0 234 57 15 10 0 82 60 199 41 0 300 25 10 57 0 92 708 15:30 19 213 12 0 244 117 29 12 0 158 65 245 53 0 363 26 19 95 0 140 905 Total Volume 73 858 44 0 975 333 85 42 0 460 230 861 193 0 1284 101 61 256 0 418 3137 % App. Total 7.5 88 4.5 0 72.4 18.5 9.1 0 17.9 67.1 15 0 24.2 14.6 61.2 0 PHF .869 .941 .846 .000 .967 .712 .733 .875 .000 .728 .885 .879 .680 .000 .884 .871 .803 .674 .000 .746 .867 Passenger Vehicles 72 838 43 0 953 320 78 40 0 438 213 850 186 0 1249 95 58 246 0 399 3039 % Passenger Vehicles Heavy Vehicles 1 11 0 0 12 12 5 2 0 19 17 6 7 0 30 6 3 9 0 18 79 % Heavy Vehicles 1.4 1.3 0 0 1.2 3.6 5.9 4.8 0 4.1 7.4 0.7 3.6 0 2.3 5.9 4.9 3.5 0 4.3 2.5 Buses 0 9 1 0 10 1 2 0 0 3 0 5 0 0 5 0 0 1 0 1 19 % Buses 0 1.0 2.3 0 1.0 0.3 2.4 0 0 0.7 0 0.6 0 0 0.4 0 0 0.4 0 0.2 0.6 SC 6 Industrial Dr Glassmaster Rd SC 6 Right 43 0 1 44 Thru 838 11 9 858 Left 72 1 0 73 Peds 0 0 0 0 InOut Total 985 953 1938 14 12 26 5 10 15 1004 1979 975 Right 40 2 0 42 Thru 78 5 2 85 Left 320 12 1 333 Peds 0 0 0 0 OutTotal In 316 438 754 11 19 30 0 3 3 327 787 460 Left 213 17 0 230 Thru 850 6 5 861 Right 186 7 0 193 Peds 0 0 0 0 Out TotalIn 1404 1249 2653 32 30 62 11 5 16 1447 2731 1284 Left 95 6 0 101 Thru 58 3 0 61 Right 246 9 1 256 Peds 0 0 0 0 TotalOut In 334 399 733 22 18 40 3 1 4 359 777 418 Peak Hour Begins at 14:45 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Glassmaster Rd-Innovation Pl @ Glassmaster-Bruner Rd Site Code : Start Date : 03/03/2026 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses Innovation Pl Southbound Bruner Rd Westbound Glassmaster Rd Northbound Glassmaster Rd Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 0 0 0 0 2 13 0 0 17 0 14 0 1 95 15 0 157 07:15 0 1 0 0 21 95 0 0 10 0 32 0 0 185 14 0 358 07:30 0 0 1 0 22 83 0 0 10 0 30 0 0 177 18 0 341 07:45 0 0 0 0 17 52 0 0 17 0 12 0 1 82 26 0 207 Total 0 1 1 0 62 243 0 0 54 0 88 0 2 539 73 0 1063 08:00 0 0 0 0 39 75 0 0 7 1 30 0 2 93 15 0 262 08:15 0 0 1 0 17 82 1 0 15 0 16 0 3 79 13 0 227 08:30 0 0 1 0 1 12 0 0 11 1 1 0 4 7 9 0 47 08:45 0 0 0 0 2 11 0 0 13 0 1 3 3 7 17 0 57 Total 0 0 2 0 59 180 1 0 46 2 48 3 12 186 54 0 593 14:00 0 0 2 0 0 6 0 0 14 0 3 0 0 40 15 0 80 14:15 0 0 1 0 0 6 0 0 7 0 3 0 0 54 13 0 84 14:30 0 0 1 0 4 41 0 0 18 1 14 0 1 79 11 0 170 14:45 0 0 0 1 18 111 0 1 15 0 25 0 0 106 14 0 291 Total 0 0 4 1 22 164 0 1 54 1 45 0 1 279 53 0 625 15:00 0 0 1 1 4 21 0 0 17 0 10 0 0 53 21 0 128 15:15 0 0 2 0 2 27 0 0 19 0 5 0 0 50 10 0 115 15:30 0 0 1 0 39 141 0 0 5 0 9 0 0 61 13 0 269 15:45 0 0 2 0 24 68 0 0 29 0 1 0 0 22 14 0 160 Total 0 0 6 1 69 257 0 0 70 0 25 0 0 186 58 0 672 Grand Total 0 1 13 2 212 844 1 1 224 3 206 3 15 1190 238 0 2953 Apprch % 0 6.2 81.2 12.5 20 79.8 0.1 0.1 51.4 0.7 47.2 0.7 1 82.5 16.5 0 Total % 0 0 0.4 0.1 7.2 28.6 0 0 7.6 0.1 7 0.1 0.5 40.3 8.1 0 Passenger Vehicles 0 1 13 2 210 831 1 1 199 3 206 3 15 1183 213 0 2881 % Passenger Vehicles 0 100 100 100 99.1 98.5 100 100 88.8 100 100 100 100 99.4 89.5 0 97.6 Heavy Vehicles 0 0 0 0 2 11 0 0 22 0 0 0 0 7 24 0 66 % Heavy Vehicles 0 0 0 0 0.9 1.3 0 0 9.8 0 0 0 0 0.6 10.1 0 2.2 Buses 0 0 0 0 0 2 0 0 3 0 0 0 0 0 1 0 6 % Buses 0 0 0 0 0 0.2 0 0 1.3 0 0 0 0 0 0.4 0 0.2 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Glassmaster Rd-Innovation Pl @ Glassmaster-Bruner Rd Site Code : Start Date : 03/03/2026 Page No : 2 Innovation Pl Glassmaster Rd Bruner Rd Glassmaster Rd Right 13 0 0 13 Thru 1 0 0 1 Left 0 0 0 0 Peds 2 0 0 2 InOut Total 19 16 35 0 0 0 0 0 0 19 35 16 Right 1 0 0 1 Thru 831 11 2 844 Left 210 2 0 212 Peds 1 0 0 1 OutTotal In 1389 1043 2432 7 13 20 0 2 2 1396 2454 1058 Left 199 22 3 224 Thru 3 0 0 3 Right 206 0 0 206 Peds 3 0 0 3 Out TotalIn 424 411 835 26 22 48 1 3 4 451 887 436 Left 15 0 0 15 Thru 1183 7 0 1190 Right 213 24 1 238 Peds 0 0 0 0 TotalOut In 1043 1411 2454 33 31 64 5 1 6 1081 2524 1443 03/03/2026 07:00 03/03/2026 15:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Glassmaster Rd-Innovation Pl @ Glassmaster-Bruner Rd Site Code : Start Date : 03/03/2026 Page No : 3 Innovation Pl Southbound Bruner Rd Westbound Glassmaster Rd Northbound Glassmaster Rd Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 0 1 0 0 1 21 95 0 0 116 10 0 32 0 42 0 185 14 0 199 358 07:30 0 0 1 0 1 22 83 0 0 105 10 0 30 0 40 0 177 18 0 195 341 07:45 0 0 0 0 0 17 52 0 0 69 17 0 12 0 29 1 82 26 0 109 207 08:00 0 0 0 0 0 39 75 0 0 114 7 1 30 0 38 2 93 15 0 110 262 Total Volume 0 1 1 0 2 99 305 0 0 404 44 1 104 0 149 3 537 73 0 613 1168 % App. Total 0 50 50 0 24.5 75.5 0 0 29.5 0.7 69.8 0 0.5 87.6 11.9 0 PHF .000 .250 .250 .000 .500 .635 .803 .000 .000 .871 .647 .250 .813 .000 .887 .375 .726 .702 .000 .770 .816 Passenger Vehicles 0 1 1 0 2 99 303 0 0 402 39 1 104 0 144 3 535 70 0 608 1156 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 2 0 0 2 4 0 0 0 4 0 2 2 0 4 10 % Heavy Vehicles 0 0 0 0 0 0 0.7 0 0 0.5 9.1 0 0 0 2.7 0 0.4 2.7 0 0.7 0.9 Buses 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 1 0 1 2 % Buses 0 0 0 0 0 0 0 0 0 0 2.3 0 0 0 0.7 0 0 1.4 0 0.2 0.2 Innovation Pl Glassmaster Rd Bruner Rd Glassmaster Rd Right 1 0 0 1 Thru 1 0 0 1 Left 0 0 0 0 Peds 0 0 0 0 InOut Total 4 2 6 0 0 0 0 0 0 4 6 2 Right 0 0 0 0 Thru 303 2 0 305 Left 99 0 0 99 Peds 0 0 0 0 OutTotal In 639 402 1041 2 2 4 0 0 0 641 1045 404 Left 39 4 1 44 Thru 1 0 0 1 Right 104 0 0 104 Peds 0 0 0 0 Out TotalIn 170 144 314 2 4 6 1 1 2 173 322 149 Left 3 0 0 3 Thru 535 2 0 537 Right 70 2 1 73 Peds 0 0 0 0 TotalOut In 343 608 951 6 4 10 1 1 2 350 963 613 Peak Hour Begins at 07:15 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Glassmaster Rd-Innovation Pl @ Glassmaster-Bruner Rd Site Code : Start Date : 03/03/2026 Page No : 4 Innovation Pl Southbound Bruner Rd Westbound Glassmaster Rd Northbound Glassmaster Rd Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 14:45 14:45 0 0 0 1 1 18 111 0 1 130 15 0 25 0 40 0 106 14 0 120 291 15:00 0 0 1 1 2 4 21 0 0 25 17 0 10 0 27 0 53 21 0 74 128 15:15 0 0 2 0 2 2 27 0 0 29 19 0 5 0 24 0 50 10 0 60 115 15:30 0 0 1 0 1 39 141 0 0 180 5 0 9 0 14 0 61 13 0 74 269 Total Volume 0 0 4 2 6 63 300 0 1 364 56 0 49 0 105 0 270 58 0 328 803 % App. Total 0 0 66.7 33.3 17.3 82.4 0 0.3 53.3 0 46.7 0 0 82.3 17.7 0 PHF .000 .000 .500 .500 .750 .404 .532 .000 .250 .506 .737 .000 .490 .000 .656 .000 .637 .690 .000 .683 .690 Passenger Vehicles 0 0 4 2 6 62 297 0 1 360 47 0 49 0 96 0 269 52 0 321 783 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 1 1 0 0 2 8 0 0 0 8 0 1 6 0 7 17 % Heavy Vehicles 0 0 0 0 0 1.6 0.3 0 0 0.5 14.3 0 0 0 7.6 0 0.4 10.3 0 2.1 2.1 Buses 0 0 0 0 0 0 2 0 0 2 1 0 0 0 1 0 0 0 0 0 3 % Buses 0 0 0 0 0 0 0.7 0 0 0.5 1.8 0 0 0 1.0 0 0 0 0 0 0.4 Innovation Pl Glassmaster Rd Bruner Rd Glassmaster Rd Right 4 0 0 4 Thru 0 0 0 0 Left 0 0 0 0 Peds 2 0 0 2 InOut Total 0 6 6 0 0 0 0 0 0 0 6 6 Right 0 0 0 0 Thru 297 1 2 300 Left 62 1 0 63 Peds 1 0 0 1 OutTotal In 318 360 678 1 2 3 0 2 2 319 683 364 Left 47 8 1 56 Thru 0 0 0 0 Right 49 0 0 49 Peds 0 0 0 0 Out TotalIn 114 96 210 7 8 15 0 1 1 121 226 105 Left 0 0 0 0 Thru 269 1 0 270 Right 52 6 0 58 Peds 0 0 0 0 TotalOut In 348 321 669 9 7 16 3 0 3 360 688 328 Peak Hour Begins at 14:45 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Bruner Rd @ School Access Site Code : 03102026 Start Date : 03/10/2026 Page No : 1 - Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses School Access To Traffic Circle Southbound Bruner Rd Westbound Northbound Bruner Rd Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 1 0 28 0 0 3 2 0 0 0 0 0 114 9 0 0 157 07:15 112 0 4 0 0 2 22 0 0 0 0 0 220 14 0 0 374 07:30 11 0 91 0 0 4 13 0 0 0 0 0 167 49 0 0 335 07:45 10 0 61 0 0 10 51 0 0 0 0 0 67 34 0 0 233 Total 134 0 184 0 0 19 88 0 0 0 0 0 568 106 0 0 1099 08:00 0 0 110 2 0 2 8 0 0 0 0 0 119 17 0 0 258 08:15 0 0 83 0 0 12 4 0 0 0 0 0 75 10 0 0 184 08:30 0 0 4 0 0 8 0 0 0 0 0 0 2 5 0 0 19 08:45 0 0 1 0 0 10 0 0 0 0 0 0 1 5 0 0 17 Total 0 0 198 2 0 32 12 0 0 0 0 0 197 37 0 0 478 14:00 0 0 2 0 0 2 17 0 0 0 0 0 14 24 0 0 59 14:15 0 2 4 0 0 2 0 0 0 0 0 0 46 12 0 0 66 14:30 2 0 38 0 0 13 3 0 0 0 0 0 70 17 0 0 143 14:45 3 0 148 0 0 4 11 0 0 0 0 0 111 37 0 0 314 Total 5 2 192 0 0 21 31 0 0 0 0 0 241 90 0 0 582 15:00 1 0 25 0 0 1 12 0 0 0 0 0 46 11 0 0 96 15:15 0 0 46 0 0 3 0 0 0 0 0 0 39 13 0 0 101 15:30 0 0 185 0 0 6 19 0 0 0 0 0 60 12 0 0 282 15:45 0 0 69 0 0 4 0 0 0 0 0 0 15 3 0 0 91 Total 1 0 325 0 0 14 31 0 0 0 0 0 160 39 0 0 570 Grand Total 140 2 899 2 0 86 162 0 0 0 0 0 1166 272 0 0 2729 Apprch % 13.4 0.2 86.2 0.2 0 34.7 65.3 0 0 0 0 0 81.1 18.9 0 0 Total % 5.1 0.1 32.9 0.1 0 3.2 5.9 0 0 0 0 0 42.7 10 0 0 Passenger Vehicles 140 2 893 2 0 81 162 0 0 0 0 0 1166 270 0 0 2716 % Passenger Vehicles 100 100 99.3 100 0 94.2 100 0 0 0 0 0 100 99.3 0 0 99.5 Heavy Vehicles 0 0 0 0 0 5 0 0 0 0 0 0 0 2 0 0 7 % Heavy Vehicles 0 0 0 0 0 5.8 0 0 0 0 0 0 0 0.7 0 0 0.3 Buses 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 % Buses 0 0 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Bruner Rd @ School Access Site Code : 03102026 Start Date : 03/10/2026 Page No : 2 School Access To Traffic Circle Bruner Rd Bruner Rd Right 893 0 6 899 Thru 2 0 0 2 Left 140 0 0 140 Peds 2 0 0 2 InOut Total 1328 1037 2365 0 0 0 0 6 6 1328 2371 1043 Right 162 0 0 162 Thru 81 5 0 86 Left 0 0 0 0 Peds 0 0 0 0 OutTotal In 410 243 653 2 5 7 0 0 0 412 660 248 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 Out TotalIn 2 0 2 0 0 0 0 0 0 2 2 0 Left 1166 0 0 1166 Thru 270 2 0 272 Right 0 0 0 0 Peds 0 0 0 0 TotalOut In 974 1436 2410 5 2 7 6 0 6 985 2423 1438 03/10/2026 07:00 03/10/2026 15:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Bruner Rd @ School Access Site Code : 03102026 Start Date : 03/10/2026 Page No : 3 School Access To Traffic Circle Southbound Bruner Rd Westbound Northbound Bruner Rd Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 112 0 4 0 116 0 2 22 0 24 0 0 0 0 0 220 14 0 0 234 374 07:30 11 0 91 0 102 0 4 13 0 17 0 0 0 0 0 167 49 0 0 216 335 07:45 10 0 61 0 71 0 10 51 0 61 0 0 0 0 0 67 34 0 0 101 233 08:00 0 0 110 2 112 0 2 8 0 10 0 0 0 0 0 119 17 0 0 136 258 Total Volume 133 0 266 2 401 0 18 94 0 112 0 0 0 0 0 573 114 0 0 687 1200 % App. Total 33.2 0 66.3 0.5 0 16.1 83.9 0 0 0 0 0 83.4 16.6 0 0 PHF .297 .000 .605 .250 .864 .000 .450 .461 .000 .459 .000 .000 .000 .000 .000 .651 .582 .000 .000 .734 .802 Passenger Vehicles 133 0 266 2 401 0 17 94 0 111 0 0 0 0 0 573 114 0 0 687 1199 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 % Heavy Vehicles 0 0 0 0 0 0 5.6 0 0 0.9 0 0 0 0 0 0 0 0 0 0 0.1 Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 School Access To Traffic Circle Bruner Rd Bruner Rd Right 266 0 0 266 Thru 0 0 0 0 Left 133 0 0 133 Peds 2 0 0 2 InOut Total 667 401 1068 0 0 0 0 0 0 667 1068 401 Right 94 0 0 94 Thru 17 1 0 18 Left 0 0 0 0 Peds 0 0 0 0 OutTotal In 247 111 358 0 1 1 0 0 0 247 359 112 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 Out TotalIn 0 0 0 0 0 0 0 0 0 0 0 0 Left 573 0 0 573 Thru 114 0 0 114 Right 0 0 0 0 Peds 0 0 0 0 TotalOut In 283 687 970 1 0 1 0 0 0 284 971 687 Peak Hour Begins at 07:15 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Bruner Rd @ School Access Site Code : 03102026 Start Date : 03/10/2026 Page No : 4 School Access To Traffic Circle Southbound Bruner Rd Westbound Northbound Bruner Rd Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 14:45 14:45 3 0 148 0 151 0 4 11 0 15 0 0 0 0 0 111 37 0 0 148 314 15:00 1 0 25 0 26 0 1 12 0 13 0 0 0 0 0 46 11 0 0 57 96 15:15 0 0 46 0 46 0 3 0 0 3 0 0 0 0 0 39 13 0 0 52 101 15:30 0 0 185 0 185 0 6 19 0 25 0 0 0 0 0 60 12 0 0 72 282 Total Volume 4 0 404 0 408 0 14 42 0 56 0 0 0 0 0 256 73 0 0 329 793 % App. Total 1 0 99 0 0 25 75 0 0 0 0 0 77.8 22.2 0 0 PHF .333 .000 .546 .000 .551 .000 .583 .553 .000 .560 .000 .000 .000 .000 .000 .577 .493 .000 .000 .556 .631 Passenger Vehicles 4 0 398 0 402 0 14 42 0 56 0 0 0 0 0 256 72 0 0 328 786 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 % Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4 0 0 0.3 0.1 Buses 0 0 6 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 % Buses 0 0 1.5 0 1.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8 School Access To Traffic Circle Bruner Rd Bruner Rd Right 398 0 6 404 Thru 0 0 0 0 Left 4 0 0 4 Peds 0 0 0 0 InOut Total 298 402 700 0 0 0 0 6 6 298 706 408 Right 42 0 0 42 Thru 14 0 0 14 Left 0 0 0 0 Peds 0 0 0 0 OutTotal In 76 56 132 1 0 1 0 0 0 77 133 56 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 Out TotalIn 0 0 0 0 0 0 0 0 0 0 0 0 Left 256 0 0 256 Thru 72 1 0 73 Right 0 0 0 0 Peds 0 0 0 0 TotalOut In 412 328 740 0 1 1 6 0 6 418 747 329 Peak Hour Begins at 14:45 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : SC 6 @ Innovation Pl Site Code : Start Date : 03/03/2026 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses SC 6 Southbound Innovation Pl Westbound SC 6 Northbound Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 10 153 0 0 10 0 11 0 0 193 29 0 0 0 0 0 406 07:15 8 181 0 0 18 0 64 0 0 172 37 0 0 0 0 0 480 07:30 30 172 0 0 23 0 59 0 0 229 41 0 0 0 0 0 554 07:45 16 180 0 0 17 0 33 0 0 234 26 0 0 0 0 0 506 Total 64 686 0 0 68 0 167 0 0 828 133 0 0 0 0 0 1946 08:00 5 185 0 0 21 0 61 0 0 228 16 0 0 0 0 0 516 08:15 4 179 0 0 14 0 49 1 0 265 13 0 0 0 0 0 525 08:30 6 186 0 0 4 0 7 1 0 281 3 0 0 0 0 0 488 08:45 6 144 0 0 0 0 3 0 0 232 5 0 0 0 0 0 390 Total 21 694 0 0 39 0 120 2 0 1006 37 0 0 0 0 0 1919 14:00 1 211 0 0 3 0 5 0 0 236 5 0 0 0 0 0 461 14:15 2 225 0 0 3 0 3 0 0 176 7 0 0 0 0 0 416 14:30 6 236 0 0 16 0 12 0 0 208 18 0 0 0 0 0 496 14:45 5 236 0 0 13 0 57 0 0 238 29 0 0 0 0 0 578 Total 14 908 0 0 35 0 77 0 0 858 59 0 0 0 0 0 1951 15:00 9 261 0 0 14 0 12 0 0 210 24 0 0 0 0 0 530 15:15 4 224 0 0 19 0 19 1 0 216 27 0 0 0 0 0 510 15:30 2 227 0 0 27 0 76 0 0 268 10 0 0 0 0 0 610 15:45 4 221 0 0 22 0 39 0 0 242 6 0 0 0 0 0 534 Total 19 933 0 0 82 0 146 1 0 936 67 0 0 0 0 0 2184 Grand Total 118 3221 0 0 224 0 510 3 0 3628 296 0 0 0 0 0 8000 Apprch % 3.5 96.5 0 0 30.4 0 69.2 0.4 0 92.5 7.5 0 0 0 0 0 Total % 1.5 40.3 0 0 2.8 0 6.4 0 0 45.3 3.7 0 0 0 0 0 Passenger Vehicles 118 3133 0 0 221 0 510 3 0 3533 291 0 0 0 0 0 7809 % Passenger Vehicles 100 97.3 0 0 98.7 0 100 100 0 97.4 98.3 0 0 0 0 0 97.6 Heavy Vehicles 0 58 0 0 0 0 0 0 0 78 0 0 0 0 0 0 136 % Heavy Vehicles 0 1.8 0 0 0 0 0 0 0 2.1 0 0 0 0 0 0 1.7 Buses 0 30 0 0 3 0 0 0 0 17 5 0 0 0 0 0 55 % Buses 0 0.9 0 0 1.3 0 0 0 0 0.5 1.7 0 0 0 0 0 0.7 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : SC 6 @ Innovation Pl Site Code : Start Date : 03/03/2026 Page No : 2 SC 6 Innovation Pl SC 6 Right 0 0 0 0 Thru 3133 58 30 3221 Left 118 0 0 118 Peds 0 0 0 0 InOut Total 4043 3251 7294 78 58 136 17 30 47 4138 7477 3339 Right 510 0 0 510 Thru 0 0 0 0 Left 221 0 3 224 Peds 3 0 0 3 OutTotal In 409 734 1143 0 0 0 5 3 8 414 1151 737 Left 0 0 0 0 Thru 3533 78 17 3628 Right 291 0 5 296 Peds 0 0 0 0 Out TotalIn 3354 3824 7178 58 78 136 33 22 55 3445 7369 3924 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 TotalOut In 0 0 0 0 0 0 0 0 0 0 0 0 03/03/2026 07:00 03/03/2026 15:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : SC 6 @ Innovation Pl Site Code : Start Date : 03/03/2026 Page No : 3 SC 6 Southbound Innovation Pl Westbound SC 6 Northbound Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 30 172 0 0 202 23 0 59 0 82 0 229 41 0 270 0 0 0 0 0 554 07:45 16 180 0 0 196 17 0 33 0 50 0 234 26 0 260 0 0 0 0 0 506 08:00 5 185 0 0 190 21 0 61 0 82 0 228 16 0 244 0 0 0 0 0 516 08:15 4 179 0 0 183 14 0 49 1 64 0 265 13 0 278 0 0 0 0 0 525 Total Volume 55 716 0 0 771 75 0 202 1 278 0 956 96 0 1052 0 0 0 0 0 2101 % App. Total 7.1 92.9 0 0 27 0 72.7 0.4 0 90.9 9.1 0 0 0 0 0 PHF .458 .968 .000 .000 .954 .815 .000 .828 .250 .848 .000 .902 .585 .000 .946 .000 .000 .000 .000 .000 .948 Passenger Vehicles 55 685 0 0 740 75 0 202 1 278 0 936 96 0 1032 0 0 0 0 0 2050 % Passenger Vehicles Heavy Vehicles 0 19 0 0 19 0 0 0 0 0 0 18 0 0 18 0 0 0 0 0 37 % Heavy Vehicles 0 2.7 0 0 2.5 0 0 0 0 0 0 1.9 0 0 1.7 0 0 0 0 0 1.8 Buses 0 12 0 0 12 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 14 % Buses 0 1.7 0 0 1.6 0 0 0 0 0 0 0.2 0 0 0.2 0 0 0 0 0 0.7 SC 6 Innovation Pl SC 6 Right 0 0 0 0 Thru 685 19 12 716 Left 55 0 0 55 Peds 0 0 0 0 InOut Total 1138 740 1878 18 19 37 2 12 14 1158 1929 771 Right 202 0 0 202 Thru 0 0 0 0 Left 75 0 0 75 Peds 1 0 0 1 OutTotal In 151 278 429 0 0 0 0 0 0 151 429 278 Left 0 0 0 0 Thru 936 18 2 956 Right 96 0 0 96 Peds 0 0 0 0 Out TotalIn 760 1032 1792 19 18 37 12 2 14 791 1843 1052 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 TotalOut In 0 0 0 0 0 0 0 0 0 0 0 0 Peak Hour Begins at 07:30 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : SC 6 @ Innovation Pl Site Code : Start Date : 03/03/2026 Page No : 4 SC 6 Southbound Innovation Pl Westbound SC 6 Northbound Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 14:45 14:45 5 236 0 0 241 13 0 57 0 70 0 238 29 0 267 0 0 0 0 0 578 15:00 9 261 0 0 270 14 0 12 0 26 0 210 24 0 234 0 0 0 0 0 530 15:15 4 224 0 0 228 19 0 19 1 39 0 216 27 0 243 0 0 0 0 0 510 15:30 2 227 0 0 229 27 0 76 0 103 0 268 10 0 278 0 0 0 0 0 610 Total Volume 20 948 0 0 968 73 0 164 1 238 0 932 90 0 1022 0 0 0 0 0 2228 % App. Total 2.1 97.9 0 0 30.7 0 68.9 0.4 0 91.2 8.8 0 0 0 0 0 PHF .556 .908 .000 .000 .896 .676 .000 .539 .250 .578 .000 .869 .776 .000 .919 .000 .000 .000 .000 .000 .913 Passenger Vehicles 20 928 0 0 948 70 0 164 1 235 0 911 90 0 1001 0 0 0 0 0 2184 % Passenger Vehicles Heavy Vehicles 0 13 0 0 13 0 0 0 0 0 0 16 0 0 16 0 0 0 0 0 29 % Heavy Vehicles 0 1.4 0 0 1.3 0 0 0 0 0 0 1.7 0 0 1.6 0 0 0 0 0 1.3 Buses 0 7 0 0 7 3 0 0 0 3 0 5 0 0 5 0 0 0 0 0 15 % Buses 0 0.7 0 0 0.7 4.1 0 0 0 1.3 0 0.5 0 0 0.5 0 0 0 0 0 0.7 SC 6 Innovation Pl SC 6 Right 0 0 0 0 Thru 928 13 7 948 Left 20 0 0 20 Peds 0 0 0 0 InOut Total 1075 948 2023 16 13 29 5 7 12 1096 2064 968 Right 164 0 0 164 Thru 0 0 0 0 Left 70 0 3 73 Peds 1 0 0 1 OutTotal In 110 235 345 0 0 0 0 3 3 110 348 238 Left 0 0 0 0 Thru 911 16 5 932 Right 90 0 0 90 Peds 0 0 0 0 Out TotalIn 998 1001 1999 13 16 29 10 5 15 1021 2043 1022 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 TotalOut In 0 0 0 0 0 0 0 0 0 0 0 0 Peak Hour Begins at 14:45 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Innovation Pl @ Internal School Dr Site Code : Start Date : 03/03/2026 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses Interal Rd Southbound Interal Rd Westbound Innovation Pl Northbound Innovation Pl Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 5 0 12 0 0 7 4 0 0 0 0 0 32 0 2 0 62 07:15 0 1 27 0 0 57 7 0 0 0 0 0 49 0 2 0 143 07:30 5 0 40 1 0 44 8 0 0 0 0 0 57 5 5 0 165 07:45 10 0 21 0 0 27 4 0 0 0 0 0 41 1 4 0 108 Total 20 1 100 1 0 135 23 0 0 0 0 0 179 6 13 0 478 08:00 4 0 12 0 0 68 5 0 0 0 0 0 14 1 6 0 110 08:15 2 0 13 0 0 52 8 0 0 0 0 0 14 1 1 0 91 08:30 4 0 11 0 0 0 2 0 0 0 0 0 7 0 4 0 28 08:45 2 0 3 0 0 0 0 0 0 0 0 0 6 0 3 0 14 Total 12 0 39 0 0 120 15 0 0 0 0 0 41 2 14 0 243 14:00 2 0 7 0 0 0 2 0 0 0 0 0 5 0 0 0 16 14:15 1 0 6 0 0 1 1 0 0 0 0 0 8 2 0 0 19 14:30 9 0 20 0 0 8 5 3 0 0 0 3 20 3 0 0 71 14:45 6 0 19 0 0 50 10 0 1 0 0 0 24 1 0 0 111 Total 18 0 52 0 0 59 18 3 1 0 0 3 57 6 0 0 217 15:00 13 0 24 0 0 2 4 1 0 0 0 1 33 3 0 0 81 15:15 14 1 35 0 0 4 0 2 0 0 0 2 32 2 0 0 92 15:30 18 0 37 0 0 63 15 0 0 0 0 0 13 0 0 0 146 15:45 13 0 21 0 0 39 4 0 1 0 0 0 9 2 0 0 89 Total 58 1 117 0 0 108 23 3 1 0 0 3 87 7 0 0 408 Grand Total 108 2 308 1 0 422 79 6 2 0 0 6 364 21 27 0 1346 Apprch % 25.8 0.5 73.5 0.2 0 83.2 15.6 1.2 25 0 0 75 88.3 5.1 6.6 0 Total % 8 0.1 22.9 0.1 0 31.4 5.9 0.4 0.1 0 0 0.4 27 1.6 2 0 Passenger Vehicles 106 2 305 1 0 422 79 6 2 0 0 6 358 21 27 0 1335 % Passenger Vehicles 98.1 100 99 100 0 100 100 100 100 0 0 100 98.4 100 100 0 99.2 Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses 2 0 3 0 0 0 0 0 0 0 0 0 6 0 0 0 11 % Buses 1.9 0 1 0 0 0 0 0 0 0 0 0 1.6 0 0 0 0.8 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Innovation Pl @ Internal School Dr Site Code : Start Date : 03/03/2026 Page No : 2 Interal Rd Innovation Pl Interal Rd Innovation Pl Right 305 0 3 308 Thru 2 0 0 2 Left 106 0 2 108 Peds 1 0 0 1 InOut Total 437 414 851 0 0 0 6 5 11 443 862 419 Right 79 0 0 79 Thru 422 0 0 422 Left 0 0 0 0 Peds 6 0 0 6 OutTotal In 127 507 634 0 0 0 2 0 2 129 636 507 Left 2 0 0 2 Thru 0 0 0 0 Right 0 0 0 0 Peds 6 0 0 6 Out TotalIn 29 8 37 0 0 0 0 0 0 29 37 8 Left 358 0 6 364 Thru 21 0 0 21 Right 27 0 0 27 Peds 0 0 0 0 TotalOut In 729 406 1135 0 0 0 3 6 9 732 1144 412 03/03/2026 07:00 03/03/2026 15:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Innovation Pl @ Internal School Dr Site Code : Start Date : 03/03/2026 Page No : 3 Interal Rd Southbound Interal Rd Westbound Innovation Pl Northbound Innovation Pl Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 0 1 27 0 28 0 57 7 0 64 0 0 0 0 0 49 0 2 0 51 143 07:30 5 0 40 1 46 0 44 8 0 52 0 0 0 0 0 57 5 5 0 67 165 07:45 10 0 21 0 31 0 27 4 0 31 0 0 0 0 0 41 1 4 0 46 108 08:00 4 0 12 0 16 0 68 5 0 73 0 0 0 0 0 14 1 6 0 21 110 Total Volume 19 1 100 1 121 0 196 24 0 220 0 0 0 0 0 161 7 17 0 185 526 % App. Total 15.7 0.8 82.6 0.8 0 89.1 10.9 0 0 0 0 0 87 3.8 9.2 0 PHF .475 .250 .625 .250 .658 .000 .721 .750 .000 .753 .000 .000 .000 .000 .000 .706 .350 .708 .000 .690 .797 Passenger Vehicles 19 1 100 1 121 0 196 24 0 220 0 0 0 0 0 157 7 17 0 181 522 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 4 4 % Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.5 0 0 0 2.2 0.8 Interal Rd Innovation Pl Interal Rd Innovation Pl Right 100 0 0 100 Thru 1 0 0 1 Left 19 0 0 19 Peds 1 0 0 1 InOut Total 181 121 302 0 0 0 4 0 4 185 306 121 Right 24 0 0 24 Thru 196 0 0 196 Left 0 0 0 0 Peds 0 0 0 0 OutTotal In 26 220 246 0 0 0 0 0 0 26 246 220 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 Out TotalIn 18 0 18 0 0 0 0 0 0 18 18 0 Left 157 0 4 161 Thru 7 0 0 7 Right 17 0 0 17 Peds 0 0 0 0 TotalOut In 296 181 477 0 0 0 0 4 4 296 481 185 Peak Hour Begins at 07:15 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Innovation Pl @ Internal School Dr Site Code : Start Date : 03/03/2026 Page No : 4 Interal Rd Southbound Interal Rd Westbound Innovation Pl Northbound Innovation Pl Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 14:45 14:45 6 0 19 0 25 0 50 10 0 60 1 0 0 0 1 24 1 0 0 25 111 15:00 13 0 24 0 37 0 2 4 1 7 0 0 0 1 1 33 3 0 0 36 81 15:15 14 1 35 0 50 0 4 0 2 6 0 0 0 2 2 32 2 0 0 34 92 15:30 18 0 37 0 55 0 63 15 0 78 0 0 0 0 0 13 0 0 0 13 146 Total Volume 51 1 115 0 167 0 119 29 3 151 1 0 0 3 4 102 6 0 0 108 430 % App. Total 30.5 0.6 68.9 0 0 78.8 19.2 2 25 0 0 75 94.4 5.6 0 0 PHF .708 .250 .777 .000 .759 .000 .472 .483 .375 .484 .250 .000 .000 .375 .500 .773 .500 .000 .000 .750 .736 Passenger Vehicles 49 1 113 0 163 0 119 29 3 151 1 0 0 3 4 102 6 0 0 108 426 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses 2 0 2 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 % Buses 3.9 0 1.7 0 2.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.9 Interal Rd Innovation Pl Interal Rd Innovation Pl Right 113 0 2 115 Thru 1 0 0 1 Left 49 0 2 51 Peds 0 0 0 0 InOut Total 131 163 294 0 0 0 0 4 4 131 298 167 Right 29 0 0 29 Thru 119 0 0 119 Left 0 0 0 0 Peds 3 0 0 3 OutTotal In 55 151 206 0 0 0 2 0 2 57 208 151 Left 1 0 0 1 Thru 0 0 0 0 Right 0 0 0 0 Peds 3 0 0 3 Out TotalIn 1 4 5 0 0 0 0 0 0 1 5 4 Left 102 0 0 102 Thru 6 0 0 6 Right 0 0 0 0 Peds 0 0 0 0 TotalOut In 233 108 341 0 0 0 2 0 2 235 343 108 Peak Hour Begins at 14:45 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Internal School Traffic Circle New Site Code : Start Date : 03/03/2026 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses Traffic Circle Access from K- 5 Pickup Southbound Traffic Circle Access from Bruner Rd Northbound Traffic Circle Access from Innovation Pl Eastbound Traffic Circle Access from 6-12 Pickup Southeastbound Start Time Thru Right Hard Right Peds Left Bear Left Thru Peds Hard Left Left Right Peds Hard Left Bear Right Hard Right Peds Peds Int. Total 07:00 3 2 0 0 4 47 43 0 0 0 5 0 2 12 8 0 0 126 07:15 14 4 1 0 3 153 73 0 0 0 0 0 11 101 53 0 0 413 07:30 3 0 0 0 2 145 55 0 1 3 4 0 13 97 49 0 0 372 07:45 15 8 0 0 2 44 59 0 4 2 7 0 0 43 22 0 0 206 Total 35 14 1 0 11 389 230 0 5 5 16 0 26 253 132 0 0 1117 08:00 74 52 0 0 1 56 61 0 0 3 2 0 0 31 19 0 0 299 08:15 54 33 0 0 5 32 61 0 0 1 1 0 0 28 19 0 0 234 08:30 0 0 0 0 2 0 0 0 0 0 5 0 0 0 0 0 0 7 08:45 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 4 Total 128 85 0 0 8 88 124 0 0 4 10 0 0 59 38 0 0 544 14:00 0 0 0 0 2 24 22 0 0 0 2 0 0 0 0 0 0 50 14:15 0 0 0 0 2 19 24 0 1 0 1 0 0 0 0 0 0 47 14:30 25 5 0 0 5 34 37 0 3 0 8 0 1 12 5 0 0 135 14:45 65 26 12 3 10 72 74 0 0 2 5 0 3 53 26 0 0 351 Total 90 31 12 3 19 149 157 0 4 2 16 0 4 65 31 0 0 583 15:00 11 4 1 1 2 32 49 0 3 1 12 0 0 2 0 0 0 118 15:15 11 2 0 0 0 9 16 0 0 0 14 0 0 6 3 0 0 61 15:30 78 32 3 12 2 44 56 0 3 0 17 0 0 82 46 0 0 375 15:45 60 32 0 1 2 2 17 0 1 0 12 0 0 8 7 0 0 142 Total 160 70 4 14 6 87 138 0 7 1 55 0 0 98 56 0 0 696 Grand Total 413 200 17 17 44 713 649 0 16 12 97 0 30 475 257 0 0 2940 Apprch % 63.8 30.9 2.6 2.6 3.1 50.7 46.2 0 12.8 9.6 77.6 0 3.9 62.3 33.7 0 0 Total % 14 6.8 0.6 0.6 1.5 24.3 22.1 0 0.5 0.4 3.3 0 1 16.2 8.7 0 0 Passenger Vehicles 413 200 17 17 44 713 649 0 16 12 95 0 30 475 257 0 0 2938 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 2 % Buses 0 0 0 0 0 0 0 0 0 0 2.1 0 0 0 0 0 0 0.1 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Internal School Traffic Circle New Site Code : Start Date : 03/03/2026 Page No : 2 Traffic Circle Access from 6-12 Pickup Traffic Circle Access from K-5 Pickup Traffic Circle Access from Innovation Pl Traffic Circle Access from Bruner Rd Hard Right 17 0 0 17 Right 200 0 0 200 Thru 413 0 0 413 Peds 17 0 0 17 InOut Total 691 647 1338 0 0 0 0 0 0 691 1338 647 Left 44 0 0 44 Bear Left 713 0 0 713 Thru 649 0 0 649 Peds 0 0 0 0 Out TotalIn 983 1406 2389 0 0 0 2 0 2 985 2391 1406 Hard Left 16 0 0 16 Left 12 0 0 12 Right 95 0 2 97 Peds 0 0 0 0 TotalOut In 501 123 624 0 0 0 0 2 2 501 626 125 Hard Right 257 0 0 257 Bear Right 475 0 0 475 HardLeft 30 0 0 30 Peds 0 0 0 0 Out 746 0 0 746 In 762 0 0 762 Total 1508 0 0 1508 03/03/2026 07:00 03/03/2026 15:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Internal School Traffic Circle New Site Code : Start Date : 03/03/2026 Page No : 3 Traffic Circle Access from K- 5 Pickup Southbound Traffic Circle Access from Bruner Rd Northbound Traffic Circle Access from Innovation Pl Eastbound Traffic Circle Access from 6-12 Pickup Southeastbound Start Time Thru Right Hard Right Peds App. Total Left Bear Left Thru Peds App. Total Hard Left Left Right Peds App. Total Hard Left Bear Right Hard Right Peds Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 14 4 1 0 19 3 153 73 0 229 0 0 0 0 0 11 101 53 0 0 165 413 07:30 3 0 0 0 3 2 145 55 0 202 1 3 4 0 8 13 97 49 0 0 159 372 07:45 15 8 0 0 23 2 44 59 0 105 4 2 7 0 13 0 43 22 0 0 65 206 08:00 74 52 0 0 126 1 56 61 0 118 0 3 2 0 5 0 31 19 0 0 50 299 Total Volume 106 64 1 0 171 8 398 248 0 654 5 8 13 0 26 24 272 143 0 0 439 1290 % App. Total 62 37.4 0.6 0 1.2 60.9 37.9 0 19.2 30.8 50 0 5.5 62 32.6 0 0 PHF .358 .308 .250 .000 .339 .667 .650 .849 .000 .714 .313 .667 .464 .000 .500 .462 .673 .675 .000 .000 .665 .781 Passenger Vehicles 106 64 1 0 171 8 398 248 0 654 5 8 13 0 26 24 272 143 0 0 439 1290 % Passenger Vehicles 100 100 100 0 100 100 100 100 0 100 100 100 100 0 100 100 100 100 0 0 100 100 Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Internal School Traffic Circle New Site Code : Start Date : 03/03/2026 Page No : 4 Traffic Circle Access from 6-12 Pickup Traffic Circle Access from K-5 Pickup Traffic Circle Access from Innovation Pl Traffic Circle Access from Bruner Rd Hard Right 1 0 0 1 Right 64 0 0 64 Thru 106 0 0 106 Peds 0 0 0 0 InOut Total 280 171 451 0 0 0 0 0 0 280 451 171 Left 8 0 0 8 Bear Left 398 0 0 398 Thru 248 0 0 248 Peds 0 0 0 0 Out TotalIn 391 654 1045 0 0 0 0 0 0 391 1045 654 Hard Left 5 0 0 5 Left 8 0 0 8 Right 13 0 0 13 Peds 0 0 0 0 TotalOut In 215 26 241 0 0 0 0 0 0 215 241 26 Hard Right 143 0 0 143 Bear Right 272 0 0 272 HardLeft 24 0 0 24 Peds 0 0 0 0 Out 404 0 0 404 In 439 0 0 439 Total 843 0 0 843 Peak Hour Begins at 07:15 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! File Name : Internal School Traffic Circle New Site Code : Start Date : 03/03/2026 Page No : 5 Traffic Circle Access from K- 5 Pickup Southbound Traffic Circle Access from Bruner Rd Northbound Traffic Circle Access from Innovation Pl Eastbound Traffic Circle Access from 6-12 Pickup Southeastbound Start Time Thru Right Hard Right Peds App. Total Left Bear Left Thru Peds App. Total Hard Left Left Right Peds App. Total Hard Left Bear Right Hard Right Peds Peds App. Total Int. Total Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 14:45 14:45 65 26 12 3 106 10 72 74 0 156 0 2 5 0 7 3 53 26 0 0 82 351 15:00 11 4 1 1 17 2 32 49 0 83 3 1 12 0 16 0 2 0 0 0 2 118 15:15 11 2 0 0 13 0 9 16 0 25 0 0 14 0 14 0 6 3 0 0 9 61 15:30 78 32 3 12 125 2 44 56 0 102 3 0 17 0 20 0 82 46 0 0 128 375 Total Volume 165 64 16 16 261 14 157 195 0 366 6 3 48 0 57 3 143 75 0 0 221 905 % App. Total 63.2 24.5 6.1 6.1 3.8 42.9 53.3 0 10.5 5.3 84.2 0 1.4 64.7 33.9 0 0 PHF .529 .500 .333 .333 .522 .350 .545 .659 .000 .587 .500 .375 .706 .000 .713 .250 .436 .408 .000 .000 .432 .603 Passenger Vehicles 165 64 16 16 261 14 157 195 0 366 6 3 46 0 55 3 143 75 0 0 221 903 % Passenger Vehicles 100 100 100 100 100 100 100 100 0 100 100 100 95.8 0 96.5 100 100 100 0 0 100 99.8 Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses 0 0 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0 0 2 % Buses 0 0 0 0 0 0 0 0 0 0 0 0 4.2 0 3.5 0 0 0 0 0 0 0.2 Traffic Circle Access from 6-12 Pickup Traffic Circle Access from K-5 Pickup Traffic Circle Access from Innovation Pl Traffic Circle Access from Bruner Rd Hard Right 16 0 0 16 Right 64 0 0 64 Thru 165 0 0 165 Peds 16 0 0 16 InOut Total 201 261 462 0 0 0 0 0 0 201 462 261 Left 14 0 0 14 Bear Left 157 0 0 157 Thru 195 0 0 195 Peds 0 0 0 0 Out TotalIn 354 366 720 0 0 0 2 0 2 356 722 366 Hard Left 6 0 0 6 Left 3 0 0 3 Right 46 0 2 48 Peds 0 0 0 0 TotalOut In 153 55 208 0 0 0 0 2 2 153 210 57 Hard Right 75 0 0 75 Bear Right 143 0 0 143 HardLeft 3 0 0 3 Peds 0 0 0 0 Out 179 0 0 179 In 221 0 0 221 Total400 0 0 400 Peak Hour Begins at 14:45 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! Site Name 32-0711 Site ID 000000320711 Description S-132 : SC 6 (S LAKE DR) TO S- 337 (SWARTZ RD) Data Item 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Data Item Statistics Type - - - - - - - - - - Statistics Type AADT 1300 1200 1350 1500 1500 1500 1450 1250 1250 1550 AADT SU AADT 23 21 24 39 50 39 38 56 56 94 SU AADT CU AADT 18 17 19 9 30 9 9 1 1 6 CU AADT Single-Unit % DHV - - - - - - - - - - Single-Unit % DHV Combo-Unit % DHV - - - - - - - - - - Combo-Unit % DHV Single-Unit % Peak - - - - - - - - - - Single-Unit % Peak Combo-Unit % Peak - - - - - - - - - - Combo-Unit % Peak K-Factor 0.09 0.09 0.09 0.11 0.11 0.11 0.11 0.11 0.11 0.1 K-Factor D-Factor 0.51 0.51 0.51 0.76 0.76 0.76 0.76 0.55 0.55 0.74 D-Factor Future AADT - - - - - - - - - - Future AADT -7.69% 12.50% 11.11% 0.00% 0.00% -3.33% -13.79% 0.00% 24.00% 2.53% 39.25352 Site Name 32-0467 Site ID 000000320467 Description S-626 : S- 1448 (ZENKER RD) TO SC 6 (S LAKE DR) Data Item 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Data Item Statistics Type - - - - - - - - - - Statistics Type AADT 8700 8400 8800 9500 9300 7400 7200 8200 8100 9500 AADT SU AADT - - - - 242 838 816 623 616 786 SU AADT CU AADT - - - - 307 222 216 221 219 234 CU AADT Single-Unit % DHV - - - - - - - - - - Single-Unit % DHV Combo-Unit % DHV - - - - - - - - - - Combo-Unit % DHV Single-Unit % Peak - - - - - - - - - - Single-Unit % Peak Combo-Unit % Peak - - - - - - - - - - Combo-Unit % Peak K-Factor - - - - - 0.1 0.1 0.1 0.1 0.11 K-Factor D-Factor - - - - - 0.52 0.52 0.55 0.55 0.63 D-Factor Future AADT - - - - - - - - - - Future AADT -3.45% 4.76% 7.95% -2.11% -20.43% -2.70% 13.89% -1.22% 17.28% 1.55% 147.6029 Site Name 32-0219 Site ID 000000320219 Description SC6 : L- 1657 (MAIDEN LN) TO I- 20 (INTERSTATE 20) Data Item 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Data Item Statistics Type - - - - - - - - - - Statistics Type AADT 21900 20500 20400 21200 21600 20800 21700 22600 23800 23100 AADT SU AADT - - - - 605 688 718 748 788 984 SU AADT CU AADT - - - - 1058 96 100 104 109 109 CU AADT Single-Unit % DHV - - - - - - - - - - Single-Unit % DHV Combo-Unit % DHV - - - - - - - - - - Combo-Unit % DHV Single-Unit % Peak - - - - - - - - - - Single-Unit % Peak Combo-Unit % Peak - - - - - - - - - - Combo-Unit % Peak K-Factor - - - - - 0.1 0.1 0.1 0.1 0.09 K-Factor D-Factor - - - - - 0.5 0.5 0.5 0.5 0.52 D-Factor Future AADT - - - - - - - - - - Future AADT -6.39% -0.49% 3.92% 1.89% -3.70% 4.33% 4.15% 5.31% -2.94% 0.67% 155.7224 Site Name 32-0693 Site ID 000000320693 Description S-337 : US 1 (E MAIN ST) TO SC 6 (S LAKE DR) Data Item 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Data Item Statistics Type - - - - - - - - - - Statistics Type AADT 2200 2200 2600 2600 2600 2800 2700 2500 2500 3500 AADT SU AADT 47 47 55 42 86 73 71 74 74 126 SU AADT CU AADT 40 40 47 2 52 1 1 1 1 3 CU AADT Single-Unit % DHV - - - - - - - - - - Single-Unit % DHV Combo-Unit % DHV - - - - - - - - - - Combo-Unit % DHV Single-Unit % Peak - - - - - - - - - - Single-Unit % Peak Combo-Unit % Peak - - - - - - - - - - Combo-Unit % Peak K-Factor 0.15 0.15 0.15 0.14 0.14 0.13 0.13 0.14 0.14 0.14 K-Factor D-Factor 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.71 0.71 0.56 D-Factor Future AADT - - - - - - - - - - Future AADT 0.00% 18.18% 0.00% 0.00% 7.69% -3.57% -7.41% 0.00% 40.00% 6.10% 213.4817 Weighted Average: 1.48% Existing Analysis Year: 2026 Build Analysis Year: 2028 Growth Factor: 1.0298 Single Station Annualized Statistics - SCDOT_PORTABLES 000000320219 Single Station Annualized Statistics - SCDOT_PORTABLES 000000320693 Single Station Annualized Statistics - SCDOT_PORTABLES 000000320711 Single Station Annualized Statistics - SCDOT_PORTABLES 000000320467 LUC 538 Charter School Students Kids/Car In Rate Multiplier Rate % In % Out Total Trips Trips In Trips Out AM-ITE 12th Edition (Site Generated New Trips) 926 2.25 1 0.84 53% 47% 778 412 366 AM-Actual (7-8 AM Existing Trips) 1674 1.96 1.000 0.84 61% 39% 1406 853 553 The actual number of students was used to calculate Kids/Cars in for AM using the IN/OUT actual splits observed AM-Actual Rate Extrapolated (Site Generated New Trips) 926 1.96 1.146 0.963 61% 39% 891 544 348 The kids/car IN rate from the above line was entered to calculate the ITE rate Multiplier. The rate multiplier was plugged in to the PM rate below. PM-ITE (Site Generated New Trips) 926 3.33 1 0.6 50% 50% 556 278 278 PM-Actual (230-330 In, 245-345 Out PM) 1674 3.89 1.070 0.64 40% 60% 1075 430 645 PM-Rate from AM rate multiplier calculated above (Site Generated New Trips) 926 3.64 1.146 0.688 40% 60% 637 255 382 AM-SC 6 at Innovation Actual 3-2026 (7-8 AM) 197 235 AM-Bruner at School Access Actual 3-2026 (7-8 AM) 656 318 AM-Total Actual 3-2026 853 553 PM-SC 6 at Innovation Actual 3-2026 (230-330 In, 245-345 Out PM) 122 237 PM-Bruner at School Access Actual 3-2026 (230-330 In, 245-345 Out PM) 308 408 PM-Total Actual 3-2026 430 645 Appendix C Intersection Reports Timings AM 2026 Existing 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 124 341 337 115 223 853 403 129 573 Future Volume (vph) 124 341 337 115 223 853 403 129 573 Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Detector Phase 8 1 4 4 1 6 4 5 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0 Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None Min None None Min Act Effct Green (s) 16.0 34.7 16.1 16.1 37.8 29.3 51.5 37.8 25.3 Actuated g/C Ratio 0.17 0.37 0.17 0.17 0.40 0.31 0.55 0.40 0.27 v/c Ratio 0.78 0.59 0.64 0.54 0.72 0.86 0.44 0.60 0.72 Control Delay 56.9 22.3 42.7 40.6 30.2 40.5 4.1 27.8 36.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 56.9 22.3 42.7 40.6 30.2 40.5 4.1 27.8 36.9 LOS E C D D C D A C D Approach Delay 35.8 42.1 29.0 35.3 Approach LOS D D C D Intersection Summary Cycle Length: 101 Actuated Cycle Length: 94.3 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay: 33.6 Intersection LOS: C Intersection Capacity Utilization 72.1% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd Phasings AM 2026 Existing 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0 Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7% Maximum Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None Min None None Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 90th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 90th %ile Term Code Max Max Max Max Max Max Max Max Max 70th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 70th %ile Term Code Max Max Max Max Max Max Max Max Max 50th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 50th %ile Term Code Max Max Max Max Max Max Max Max Hold 30th %ile Green (s) 15.7 12.1 15.7 15.7 12.1 29.4 15.7 8.7 26.0 30th %ile Term Code Gap Gap Gap Gap Gap Gap Gap Gap Hold 10th %ile Green (s) 11.1 9.0 11.4 11.4 9.0 21.7 11.4 6.8 19.5 10th %ile Term Code Gap Gap Gap Gap Gap Gap Gap Gap Hold Intersection Summary Cycle Length: 101 Actuated Cycle Length: 94.3 Control Type: Actuated-Uncoordinated 90th %ile Actuated Cycle: 101 70th %ile Actuated Cycle: 101 50th %ile Actuated Cycle: 101 30th %ile Actuated Cycle: 93.5 10th %ile Actuated Cycle: 75 Queues AM 2026 Existing 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Group Flow (vph) 242 379 374 172 248 948 448 143 683 v/c Ratio 0.78 0.59 0.64 0.54 0.72 0.86 0.44 0.60 0.72 Control Delay 56.9 22.3 42.7 40.6 30.2 40.5 4.1 27.8 36.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 56.9 22.3 42.7 40.6 30.2 40.5 4.1 27.8 36.9 Queue Length 50th (ft) 149 141 115 92 96 298 26 52 208 Queue Length 95th (ft) #261 238 164 160 #173 #382 76 95 274 Internal Link Dist (ft) 665 963 493 629 Turn Bay Length (ft) 325 200 300 200 Base Capacity (vph) 353 669 663 358 376 1217 1055 250 1021 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.69 0.57 0.56 0.48 0.66 0.78 0.42 0.57 0.67 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary AM 2026 Existing 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 94 124 341 337 115 40 223 853 403 129 573 41 Future Volume (veh/h) 94 124 341 337 115 40 223 853 403 129 573 41 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 104 138 379 374 128 44 248 948 448 143 637 46 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 157 209 511 486 187 64 374 1134 729 239 909 66 Arrive On Green 0.20 0.20 0.20 0.14 0.14 0.14 0.12 0.32 0.32 0.07 0.27 0.27 Sat Flow, veh/h 787 1044 1585 3456 1331 457 1781 3554 1585 1781 3361 242 Grp Volume(v), veh/h 242 0 379 374 0 172 248 948 448 143 336 347 Grp Sat Flow(s),veh/h/ln 1831 0 1585 1728 0 1788 1781 1777 1585 1781 1777 1827 Q Serve(g_s), s 11.0 0.0 18.0 9.4 0.0 8.2 8.8 22.3 19.2 4.8 15.3 15.4 Cycle Q Clear(g_c), s 11.0 0.0 18.0 9.4 0.0 8.2 8.8 22.3 19.2 4.8 15.3 15.4 Prop In Lane 0.43 1.00 1.00 0.26 1.00 1.00 1.00 0.13 Lane Grp Cap(c), veh/h 366 0 511 486 0 252 374 1134 729 239 481 494 V/C Ratio(X) 0.66 0.00 0.74 0.77 0.00 0.68 0.66 0.84 0.61 0.60 0.70 0.70 Avail Cap(c_a), veh/h 366 0 511 691 0 357 432 1263 786 286 533 548 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.2 0.0 27.2 37.3 0.0 36.8 21.2 28.5 18.3 22.0 29.6 29.6 Incr Delay (d2), s/veh 4.4 0.0 5.7 3.4 0.0 3.3 3.1 4.6 1.3 2.4 3.6 3.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.0 0.0 7.5 4.0 0.0 3.6 3.7 9.4 8.7 2.0 6.6 6.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 37.6 0.0 32.9 40.6 0.0 40.0 24.3 33.1 19.6 24.4 33.2 33.1 LnGrp LOS D A C D A D C C B C C C Approach Vol, veh/h 621 546 1644 826 Approach Delay, s/veh 34.7 40.4 28.1 31.6 Approach LOS C D C C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 17.0 30.4 18.7 12.7 34.7 24.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 14.0 27.0 18.0 9.0 32.0 18.0 Max Q Clear Time (g_c+I1), s 10.8 17.4 11.4 6.8 24.3 20.0 Green Ext Time (p_c), s 0.2 2.7 1.3 0.1 4.4 0.0 Intersection Summary HCM 6th Ctrl Delay 31.9 HCM 6th LOS C HCM 6th TWSC AM 2026 Existing 6: Glassmaster Rd & Bruner Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 4.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 537 73 99 305 44 104 Future Vol, veh/h 537 73 99 305 44 104 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 597 81 110 339 49 116 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 678 0 1197 638 Stage 1 - - - - 638 - Stage 2 - - - - 559 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 914 - 205 477 Stage 1 - - - - 526 - Stage 2 - - - - 572 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 914 - 175 477 Mov Cap-2 Maneuver - - - - 175 - Stage 1 - - - - 526 - Stage 2 - - - - 487 - Approach EB WB NB HCM Control Delay, s 0 2.3 28.3 HCM LOS D Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 315 - - 914 - HCM Lane V/C Ratio 0.522 - - 0.12 - HCM Control Delay (s) 28.3 - - 9.5 0 HCM Lane LOS D - - A A HCM 95th %tile Q(veh) 2.8 - - 0.4 - HCM 6th TWSC AM 2026 Existing 9: Bruner Rd & School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 217.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 573 114 18 94 133 266 Future Vol, veh/h 573 114 18 94 133 266 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 637 127 20 104 148 296 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 124 0 - 0 1473 72 Stage 1 - - - - 72 - Stage 2 - - - - 1401 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1463 - - - ~ 140 990 Stage 1 - - - - 951 - Stage 2 - - - - 228 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1463 - - - ~ 74 990 Mov Cap-2 Maneuver - - - - ~ 74 - Stage 1 - - - - 506 - Stage 2 - - - - 228 - Approach EB WB SB HCM Control Delay, s 7.8 0 $ 638.7 HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1463 - - - 193 HCM Lane V/C Ratio 0.435 - - - 2.297 HCM Control Delay (s) 9.3 0 - -$ 638.7 HCM Lane LOS A A - - F HCM 95th %tile Q(veh) 2.3 - - - 35.9 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th TWSC AM 2026 Existing 10: SC 6 & Innovation Pl 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 3.6 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 75 202 956 96 55 716 Future Vol, veh/h 75 202 956 96 55 716 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 100 - - 25 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 83 224 1062 107 61 796 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1636 585 0 0 1169 0 Stage 1 1116 - - - - - Stage 2 520 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 92 454 - - 593 - Stage 1 275 - - - - - Stage 2 561 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 83 454 - - 593 - Mov Cap-2 Maneuver 196 - - - - - Stage 1 275 - - - - - Stage 2 503 - - - - - Approach WB NB SB HCM Control Delay, s 24.7 0 0.8 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - - 196 454 593 - HCM Lane V/C Ratio - - 0.425 0.494 0.103 - HCM Control Delay (s) - - 36.3 20.4 11.8 - HCM Lane LOS - - E C B - HCM 95th %tile Q(veh) - - 1.9 2.7 0.3 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th Roundabout AM 2026 Existing 11: School Access/6-12 & Innov.Pl Connector/K-5 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Intersection Delay, s/veh 8.3 Intersection LOS A Approach EB WB NB SB Entry Lanes 1 1 1 1 Conflicting Circle Lanes 1 1 1 1 Adj Approach Flow, veh/h 29 190 727 488 Demand Flow Rate, veh/h 29 193 742 498 Vehicles Circulating, veh/h 456 466 43 201 Vehicles Exiting, veh/h 243 319 442 458 Ped Vol Crossing Leg, #/h 0 0 0 0 Ped Cap Adj 1.000 1.000 1.000 1.000 Approach Delay, s/veh 4.5 6.6 9.1 8.1 Approach LOS A A A A Lane Left Left Left Left Designated Moves LTR LTR LTR LTR Assumed Moves LTR LTR LTR LTR RT Channelized Lane Util 1.000 1.000 1.000 1.000 Follow-Up Headway, s 2.609 2.609 2.609 2.609 Critical Headway, s 4.976 4.976 4.976 4.976 Entry Flow, veh/h 29 193 742 498 Cap Entry Lane, veh/h 867 858 1321 1124 Entry HV Adj Factor 0.994 0.982 0.980 0.980 Flow Entry, veh/h 29 190 727 488 Cap Entry, veh/h 861 843 1294 1101 V/C Ratio 0.033 0.225 0.562 0.443 Control Delay, s/veh 4.5 6.6 9.1 8.1 LOS A A A A 95th %tile Queue, veh 0 1 4 2 HCM 6th TWSC AM 2026 Existing 12: Innovation Pl & Innov.Pl Connector & Internal School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 5.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 161 7 17 0 196 24 0 0 0 19 1 100 Future Vol, veh/h 161 7 17 0 196 24 0 0 0 19 1 100 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 179 8 19 0 218 27 0 0 0 21 1 111 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 245 0 0 27 0 0 664 621 18 608 617 232 Stage 1 - - - - - - 376 376 - 232 232 - Stage 2 - - - - - - 288 245 - 376 385 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1321 - - 1587 - - 374 403 1061 408 405 807 Stage 1 - - - - - - 645 616 - 771 713 - Stage 2 - - - - - - 720 703 - 645 611 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1321 - - 1587 - - 288 347 1061 365 349 807 Mov Cap-2 Maneuver - - - - - - 288 347 - 365 349 - Stage 1 - - - - - - 556 531 - 665 713 - Stage 2 - - - - - - 620 703 - 556 527 - Approach EB WB NB SB HCM Control Delay, s 7.1 0 0 11.7 HCM LOS A B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1321 - - 1587 - - 671 HCM Lane V/C Ratio - 0.135 - - - - - 0.199 HCM Control Delay (s) 0 8.2 0 - 0 - - 11.7 HCM Lane LOS A A A - A - - B HCM 95th %tile Q(veh) - 0.5 - - 0 - - 0.7 Timings AM 2028 Background 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 128 351 347 118 230 878 415 133 590 Future Volume (vph) 128 351 347 118 230 878 415 133 590 Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Detector Phase 8 1 4 4 1 6 4 5 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0 Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None Min None None Min Act Effct Green (s) 16.3 35.2 16.3 16.3 38.5 29.9 52.3 38.5 25.7 Actuated g/C Ratio 0.17 0.37 0.17 0.17 0.40 0.31 0.55 0.40 0.27 v/c Ratio 0.80 0.60 0.66 0.56 0.75 0.88 0.45 0.62 0.74 Control Delay 59.0 23.0 43.6 41.5 33.2 42.1 4.7 29.5 37.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.0 23.0 43.6 41.5 33.2 42.1 4.7 29.5 37.7 LOS E C D D C D A C D Approach Delay 37.0 42.9 30.6 36.2 Approach LOS D D C D Intersection Summary Cycle Length: 101 Actuated Cycle Length: 95.4 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 34.8 Intersection LOS: C Intersection Capacity Utilization 73.6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd Phasings AM 2028 Background 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0 Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7% Maximum Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None Min None None Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 90th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 90th %ile Term Code Max Max Max Max Max Max Max Max Max 70th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 70th %ile Term Code Max Max Max Max Max Max Max Max Max 50th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 50th %ile Term Code Max Max Max Max Max Max Max Max Hold 30th %ile Green (s) 16.5 12.7 16.2 16.2 12.7 31.0 16.2 9.0 27.3 30th %ile Term Code Gap Gap Gap Gap Gap Gap Gap Max Hold 10th %ile Green (s) 11.7 9.5 11.8 11.8 9.5 22.9 11.8 7.0 20.4 10th %ile Term Code Gap Gap Gap Gap Gap Gap Gap Gap Hold Intersection Summary Cycle Length: 101 Actuated Cycle Length: 95.4 Control Type: Actuated-Uncoordinated 90th %ile Actuated Cycle: 101 70th %ile Actuated Cycle: 101 50th %ile Actuated Cycle: 101 30th %ile Actuated Cycle: 96.7 10th %ile Actuated Cycle: 77.4 Queues AM 2028 Background 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Group Flow (vph) 250 390 386 177 256 976 461 148 703 v/c Ratio 0.80 0.60 0.66 0.56 0.75 0.88 0.45 0.62 0.74 Control Delay 59.0 23.0 43.6 41.5 33.2 42.1 4.7 29.5 37.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.0 23.0 43.6 41.5 33.2 42.1 4.7 29.5 37.7 Queue Length 50th (ft) 155 148 120 96 100 310 34 54 216 Queue Length 95th (ft) #273 248 169 165 #194 #421 91 #103 283 Internal Link Dist (ft) 665 963 493 629 Turn Bay Length (ft) 325 200 300 200 Base Capacity (vph) 348 666 654 353 366 1199 1047 246 1009 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.72 0.59 0.59 0.50 0.70 0.81 0.44 0.60 0.70 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary AM 2028 Background 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 97 128 351 347 118 41 230 878 415 133 590 42 Future Volume (veh/h) 97 128 351 347 118 41 230 878 415 133 590 42 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 108 142 390 386 131 46 256 976 461 148 656 47 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 156 205 510 496 190 67 373 1145 738 237 917 66 Arrive On Green 0.20 0.20 0.20 0.14 0.14 0.14 0.12 0.32 0.32 0.08 0.27 0.27 Sat Flow, veh/h 791 1040 1585 3456 1322 464 1781 3554 1585 1781 3363 241 Grp Volume(v), veh/h 250 0 390 386 0 177 256 976 461 148 346 357 Grp Sat Flow(s),veh/h/ln 1831 0 1585 1728 0 1787 1781 1777 1585 1781 1777 1827 Q Serve(g_s), s 11.6 0.0 18.0 9.9 0.0 8.6 9.3 23.5 20.1 5.0 16.1 16.1 Cycle Q Clear(g_c), s 11.6 0.0 18.0 9.9 0.0 8.6 9.3 23.5 20.1 5.0 16.1 16.1 Prop In Lane 0.43 1.00 1.00 0.26 1.00 1.00 1.00 0.13 Lane Grp Cap(c), veh/h 360 0 510 496 0 256 373 1145 738 237 484 498 V/C Ratio(X) 0.69 0.00 0.77 0.78 0.00 0.69 0.69 0.85 0.62 0.62 0.71 0.72 Avail Cap(c_a), veh/h 360 0 510 680 0 351 423 1243 782 278 524 539 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.2 0.0 27.9 37.8 0.0 37.3 21.6 29.0 18.4 22.4 30.1 30.1 Incr Delay (d2), s/veh 5.7 0.0 6.8 4.0 0.0 3.4 3.9 5.6 1.4 3.3 4.2 4.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.4 0.0 8.0 4.2 0.0 3.8 3.9 10.1 9.2 2.1 7.0 7.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 39.9 0.0 34.7 41.7 0.0 40.6 25.5 34.5 19.9 25.6 34.3 34.2 LnGrp LOS D A C D A D C C B C C C Approach Vol, veh/h 640 563 1693 851 Approach Delay, s/veh 36.7 41.4 29.2 32.8 Approach LOS D D C C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 17.4 30.9 19.1 12.9 35.5 24.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 14.0 27.0 18.0 9.0 32.0 18.0 Max Q Clear Time (g_c+I1), s 11.3 18.1 11.9 7.0 25.5 20.0 Green Ext Time (p_c), s 0.2 2.6 1.3 0.1 4.0 0.0 Intersection Summary HCM 6th Ctrl Delay 33.1 HCM 6th LOS C HCM 6th TWSC AM 2028 Background 6: Glassmaster Rd & Bruner Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 1.6 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 553 75 20 410 45 20 Future Vol, veh/h 553 75 20 410 45 20 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 614 83 22 456 50 22 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 697 0 1156 656 Stage 1 - - - - 656 - Stage 2 - - - - 500 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 899 - 217 465 Stage 1 - - - - 516 - Stage 2 - - - - 609 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 899 - 210 465 Mov Cap-2 Maneuver - - - - 210 - Stage 1 - - - - 516 - Stage 2 - - - - 589 - Approach EB WB NB HCM Control Delay, s 0 0.4 24.8 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 253 - - 899 - HCM Lane V/C Ratio 0.285 - - 0.025 - HCM Control Delay (s) 24.8 - - 9.1 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 1.1 - - 0.1 - HCM 6th TWSC AM 2028 Background 9: Bruner Rd & School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 9.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 590 20 19 0 0 411 Future Vol, veh/h 590 20 19 0 0 411 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 656 22 21 0 0 457 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 21 0 - 0 1355 21 Stage 1 - - - - 21 - Stage 2 - - - - 1334 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1595 - - - 165 1056 Stage 1 - - - - 1002 - Stage 2 - - - - 246 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1595 - - - 96 1056 Mov Cap-2 Maneuver - - - - 96 - Stage 1 - - - - 585 - Stage 2 - - - - 246 - Approach EB WB SB HCM Control Delay, s 8.5 0 11 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1595 - - - 1056 HCM Lane V/C Ratio 0.411 - - - 0.432 HCM Control Delay (s) 8.8 0 - - 11 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 2.1 - - - 2.2 HCM 6th TWSC AM 2028 Background 10: SC 6 & Innovation Pl 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 3.8 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 77 208 985 99 57 737 Future Vol, veh/h 77 208 985 99 57 737 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 100 - - 25 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 86 231 1094 110 63 819 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1685 602 0 0 1204 0 Stage 1 1149 - - - - - Stage 2 536 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver ~ 85 443 - - 575 - Stage 1 264 - - - - - Stage 2 551 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 76 443 - - 575 - Mov Cap-2 Maneuver 187 - - - - - Stage 1 264 - - - - - Stage 2 490 - - - - - Approach WB NB SB HCM Control Delay, s 26.5 0 0.9 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - - 187 443 575 - HCM Lane V/C Ratio - - 0.458 0.522 0.11 - HCM Control Delay (s) - - 39.5 21.7 12 - HCM Lane LOS - - E C B - HCM 95th %tile Q(veh) - - 2.2 2.9 0.4 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th Roundabout AM 2028 Background 11: School Access/6-12 & Innov.Pl Connector/K-5 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Intersection Delay, s/veh 8.3 Intersection LOS A Approach EB WB NB SB Entry Lanes 1 1 1 1 Conflicting Circle Lanes 1 1 1 1 Adj Approach Flow, veh/h 29 190 727 488 Demand Flow Rate, veh/h 29 193 742 498 Vehicles Circulating, veh/h 456 466 43 201 Vehicles Exiting, veh/h 243 319 442 458 Ped Vol Crossing Leg, #/h 0 0 0 0 Ped Cap Adj 1.000 1.000 1.000 1.000 Approach Delay, s/veh 4.5 6.6 9.1 8.1 Approach LOS A A A A Lane Left Left Left Left Designated Moves LTR LTR LTR LTR Assumed Moves LTR LTR LTR LTR RT Channelized Lane Util 1.000 1.000 1.000 1.000 Follow-Up Headway, s 2.609 2.609 2.609 2.609 Critical Headway, s 4.976 4.976 4.976 4.976 Entry Flow, veh/h 29 193 742 498 Cap Entry Lane, veh/h 867 858 1321 1124 Entry HV Adj Factor 0.994 0.982 0.980 0.980 Flow Entry, veh/h 29 190 727 488 Cap Entry, veh/h 861 843 1294 1101 V/C Ratio 0.033 0.225 0.562 0.443 Control Delay, s/veh 4.5 6.6 9.1 8.1 LOS A A A A 95th %tile Queue, veh 0 1 4 2 HCM 6th TWSC AM 2028 Background 12: Innovation Pl & Innov.Pl Connector & Internal School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 5.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 161 7 17 0 196 24 0 0 0 19 1 100 Future Vol, veh/h 161 7 17 0 196 24 0 0 0 19 1 100 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 179 8 19 0 218 27 0 0 0 21 1 111 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 245 0 0 27 0 0 664 621 18 608 617 232 Stage 1 - - - - - - 376 376 - 232 232 - Stage 2 - - - - - - 288 245 - 376 385 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1321 - - 1587 - - 374 403 1061 408 405 807 Stage 1 - - - - - - 645 616 - 771 713 - Stage 2 - - - - - - 720 703 - 645 611 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1321 - - 1587 - - 288 347 1061 365 349 807 Mov Cap-2 Maneuver - - - - - - 288 347 - 365 349 - Stage 1 - - - - - - 556 531 - 665 713 - Stage 2 - - - - - - 620 703 - 556 527 - Approach EB WB NB SB HCM Control Delay, s 7.1 0 0 11.7 HCM LOS A B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1321 - - 1587 - - 671 HCM Lane V/C Ratio - 0.135 - - - - - 0.199 HCM Control Delay (s) 0 8.2 0 - 0 - - 11.7 HCM Lane LOS A A A - A - - B HCM 95th %tile Q(veh) - 0.5 - - 0 - - 0.7 Timings AM 2028 Build 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 215 351 486 167 230 938 665 232 614 Future Volume (vph) 215 351 486 167 230 938 665 232 614 Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Detector Phase 8 1 4 4 1 6 4 5 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0 Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None Min None None Min Act Effct Green (s) 18.0 37.2 18.0 18.0 40.7 31.7 55.7 40.7 27.5 Actuated g/C Ratio 0.18 0.37 0.18 0.18 0.40 0.31 0.55 0.40 0.27 v/c Ratio 1.08 0.60 0.88 0.76 0.79 0.94 0.78 1.11 0.77 Control Delay 112.3 23.4 57.7 53.1 38.7 49.6 21.1 117.9 39.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 112.3 23.4 57.7 53.1 38.7 49.6 21.1 117.9 39.6 LOS F C E D D D C F D Approach Delay 65.6 56.2 37.9 59.9 Approach LOS E E D E Intersection Summary Cycle Length: 101 Actuated Cycle Length: 100.7 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.11 Intersection Signal Delay: 50.4 Intersection LOS: D Intersection Capacity Utilization 89.6% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd Phasings AM 2028 Build 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0 Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7% Maximum Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None Min None None Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 90th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 90th %ile Term Code Max Max Max Max Max Max Max Max Max 70th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 70th %ile Term Code Max Max Max Max Max Max Max Max Max 50th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0 50th %ile Term Code Max Max Max Max Max Max Max Max Hold 30th %ile Green (s) 18.0 13.3 18.0 18.0 13.3 32.0 18.0 9.0 27.7 30th %ile Term Code Max Gap Max Max Gap Max Max Max Hold 10th %ile Green (s) 18.0 10.6 18.0 18.0 10.6 30.5 18.0 9.0 28.9 10th %ile Term Code Max Gap Max Max Gap Gap Max Max Hold Intersection Summary Cycle Length: 101 Actuated Cycle Length: 100.7 Control Type: Actuated-Uncoordinated 90th %ile Actuated Cycle: 101 70th %ile Actuated Cycle: 101 50th %ile Actuated Cycle: 101 30th %ile Actuated Cycle: 101 10th %ile Actuated Cycle: 99.5 Queues AM 2028 Build 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Group Flow (vph) 352 390 540 253 256 1042 739 258 736 v/c Ratio 1.08 0.60 0.88 0.76 0.79 0.94 0.78 1.11 0.77 Control Delay 112.3 23.4 57.7 53.1 38.7 49.6 21.1 117.9 39.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 112.3 23.4 57.7 53.1 38.7 49.6 21.1 117.9 39.6 Queue Length 50th (ft) ~254 148 176 147 100 340 287 ~140 228 Queue Length 95th (ft) #430 248 #267 #264 #212 #470 462 #299 298 Internal Link Dist (ft) 665 963 493 629 Turn Bay Length (ft) 325 200 300 200 Base Capacity (vph) 327 658 613 332 338 1124 942 232 962 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 1.08 0.59 0.88 0.76 0.76 0.93 0.78 1.11 0.77 Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary AM 2028 Build 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 102 215 351 486 167 60 230 938 665 232 614 49 Future Volume (veh/h) 102 215 351 486 167 60 230 938 665 232 614 49 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 113 239 390 540 186 67 256 1042 739 258 682 54 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 106 224 475 606 230 83 361 1130 782 240 956 76 Arrive On Green 0.18 0.18 0.18 0.18 0.18 0.18 0.12 0.32 0.32 0.09 0.29 0.29 Sat Flow, veh/h 591 1250 1585 3456 1312 473 1781 3554 1585 1781 3336 264 Grp Volume(v), veh/h 352 0 390 540 0 253 256 1042 739 258 363 373 Grp Sat Flow(s),veh/h/ln 1841 0 1585 1728 0 1785 1781 1777 1585 1781 1777 1823 Q Serve(g_s), s 18.0 0.0 18.0 15.4 0.0 13.7 10.0 28.5 32.0 9.0 18.4 18.5 Cycle Q Clear(g_c), s 18.0 0.0 18.0 15.4 0.0 13.7 10.0 28.5 32.0 9.0 18.4 18.5 Prop In Lane 0.32 1.00 1.00 0.26 1.00 1.00 1.00 0.14 Lane Grp Cap(c), veh/h 329 0 475 606 0 313 361 1130 782 240 509 523 V/C Ratio(X) 1.07 0.00 0.82 0.89 0.00 0.81 0.71 0.92 0.95 1.07 0.71 0.71 Avail Cap(c_a), veh/h 329 0 475 618 0 319 394 1130 782 240 509 523 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.3 0.0 32.7 40.6 0.0 39.9 23.3 33.1 21.0 26.0 32.2 32.2 Incr Delay (d2), s/veh 69.1 0.0 11.0 15.0 0.0 14.1 5.3 12.3 20.0 79.1 4.6 4.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 14.1 0.0 9.7 7.5 0.0 7.0 4.4 13.3 22.4 8.9 8.1 8.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 110.4 0.0 43.8 55.6 0.0 54.0 28.5 45.4 41.1 105.2 36.8 36.8 LnGrp LOS F A D E A D C D D F D D Approach Vol, veh/h 742 793 2037 994 Approach Delay, s/veh 75.4 55.1 41.7 54.5 Approach LOS E E D D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 18.1 34.9 23.6 15.0 38.0 24.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 14.0 27.0 18.0 9.0 32.0 18.0 Max Q Clear Time (g_c+I1), s 12.0 20.5 17.4 11.0 34.0 20.0 Green Ext Time (p_c), s 0.1 2.2 0.3 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 52.3 HCM 6th LOS D HCM 6th TWSC AM 2028 Build 6: Glassmaster Rd & Bruner Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 6.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 983 82 27 612 50 25 Future Vol, veh/h 983 82 27 612 50 25 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1092 91 30 680 56 28 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 1183 0 1878 1138 Stage 1 - - - - 1138 - Stage 2 - - - - 740 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 590 - 78 245 Stage 1 - - - - 306 - Stage 2 - - - - 472 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 590 - 72 245 Mov Cap-2 Maneuver - - - - 72 - Stage 1 - - - - 306 - Stage 2 - - - - 433 - Approach EB WB NB HCM Control Delay, s 0 0.5 144 HCM LOS F Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 94 - - 590 - HCM Lane V/C Ratio 0.887 - - 0.051 - HCM Control Delay (s) 144 - - 11.4 0 HCM Lane LOS F - - B A HCM 95th %tile Q(veh) 5 - - 0.2 - HCM 6th TWSC AM 2028 Build 9: Bruner Rd & School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 13.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1025 20 19 0 0 620 Future Vol, veh/h 1025 20 19 0 0 620 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1139 22 21 0 0 689 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 21 0 - 0 2321 21 Stage 1 - - - - 21 - Stage 2 - - - - 2300 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1595 - - - 41 1056 Stage 1 - - - - 1002 - Stage 2 - - - - 81 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1595 - - - 11 1056 Mov Cap-2 Maneuver - - - - 11 - Stage 1 - - - - 278 - Stage 2 - - - - 81 - Approach EB WB SB HCM Control Delay, s 12.4 0 14.6 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1595 - - - 1056 HCM Lane V/C Ratio 0.714 - - - 0.652 HCM Control Delay (s) 12.7 0 - - 14.6 HCM Lane LOS B A - - B HCM 95th %tile Q(veh) 6.7 - - - 5.1 HCM 6th TWSC AM 2028 Build 10: SC 6 & Innovation Pl 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 10 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 115 309 999 170 95 829 Future Vol, veh/h 115 309 999 170 95 829 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 100 - - 25 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 128 343 1110 189 106 921 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1878 650 0 0 1299 0 Stage 1 1205 - - - - - Stage 2 673 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver ~ 63 412 - - 529 - Stage 1 247 - - - - - Stage 2 468 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 50 412 - - 529 - Mov Cap-2 Maneuver 157 - - - - - Stage 1 247 - - - - - Stage 2 374 - - - - - Approach WB NB SB HCM Control Delay, s 56.1 0 1.4 HCM LOS F Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - - 157 412 529 - HCM Lane V/C Ratio - - 0.814 0.833 0.2 - HCM Control Delay (s) - - 86.8 44.7 13.5 - HCM Lane LOS - - F E B - HCM 95th %tile Q(veh) - - 5.3 7.8 0.7 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th Roundabout AM 2028 Build 11: School Access/6-12 & Innov.Pl Connector/K-5 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Intersection Delay, s/veh 20.6 Intersection LOS C Approach EB WB NB SB Entry Lanes 1 1 1 1 Conflicting Circle Lanes 1 1 1 1 Adj Approach Flow, veh/h 45 289 1139 739 Demand Flow Rate, veh/h 45 295 1162 754 Vehicles Circulating, veh/h 723 723 65 302 Vehicles Exiting, veh/h 333 504 703 716 Ped Vol Crossing Leg, #/h 0 0 0 0 Ped Cap Adj 1.000 1.000 1.000 1.000 Approach Delay, s/veh 6.2 12.2 25.5 17.0 Approach LOS A B D C Lane Left Left Left Left Designated Moves LTR LTR LTR LTR Assumed Moves LTR LTR LTR LTR RT Channelized Lane Util 1.000 1.000 1.000 1.000 Follow-Up Headway, s 2.609 2.609 2.609 2.609 Critical Headway, s 4.976 4.976 4.976 4.976 Entry Flow, veh/h 45 295 1162 754 Cap Entry Lane, veh/h 660 660 1291 1014 Entry HV Adj Factor 0.993 0.980 0.980 0.981 Flow Entry, veh/h 45 289 1139 739 Cap Entry, veh/h 655 647 1266 994 V/C Ratio 0.068 0.447 0.900 0.744 Control Delay, s/veh 6.2 12.2 25.5 17.0 LOS A B D C 95th %tile Queue, veh 0 2 14 7 HCM 6th TWSC AM 2028 Build 12: Innovation Pl & Innov.Pl Connector & Internal School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 6.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 231 10 24 0 270 24 0 0 0 30 1 154 Future Vol, veh/h 231 10 24 0 270 24 0 0 0 30 1 154 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 257 11 27 0 300 27 0 0 0 33 1 171 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 327 0 0 38 0 0 939 866 25 853 866 314 Stage 1 - - - - - - 539 539 - 314 314 - Stage 2 - - - - - - 400 327 - 539 552 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1233 - - 1572 - - 244 291 1051 279 291 726 Stage 1 - - - - - - 527 522 - 697 656 - Stage 2 - - - - - - 626 648 - 527 515 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1233 - - 1572 - - 155 229 1051 233 229 726 Mov Cap-2 Maneuver - - - - - - 155 229 - 233 229 - Stage 1 - - - - - - 414 410 - 548 656 - Stage 2 - - - - - - 478 648 - 414 405 - Approach EB WB NB SB HCM Control Delay, s 7.6 0 0 15.8 HCM LOS A C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1233 - - 1572 - - 536 HCM Lane V/C Ratio - 0.208 - - - - - 0.383 HCM Control Delay (s) 0 8.7 0 - 0 - - 15.8 HCM Lane LOS A A A - A - - C HCM 95th %tile Q(veh) - 0.8 - - 0 - - 1.8 Timings AM 2028 Build w Mitigation 3: SC 6 & Industrial Dr/Glassmaster Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 102 215 351 486 167 230 938 665 232 614 Future Volume (vph) 102 215 351 486 167 230 938 665 232 614 Turn Type D.P+P NA pm+ov D.P+P NA D.P+P NA pm+ov D.P+P NA Protected Phases 3 8 1 7 4 1 6 7 5 2 Permitted Phases 4 8 8 2 6 6 Detector Phase 3 8 1 7 4 1 6 7 5 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 24.0 25.0 28.0 28.0 25.0 47.0 28.0 21.0 43.0 Total Split (%) 20.0% 20.0% 20.8% 23.3% 23.3% 20.8% 39.2% 23.3% 17.5% 35.8% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lag Lead Lead Lag Lead-Lag Optimize? Recall Mode None None None None None None Min None None Min Act Effct Green (s) 36.6 17.1 37.8 36.6 26.2 52.4 37.8 63.3 52.4 37.8 Actuated g/C Ratio 0.32 0.15 0.33 0.32 0.23 0.46 0.33 0.56 0.46 0.33 v/c Ratio 0.33 0.85 0.67 0.72 0.60 0.69 0.88 0.78 0.88 0.63 Control Delay 27.3 74.9 31.9 32.7 44.7 26.9 45.8 22.7 59.0 35.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 27.3 74.9 31.9 32.7 44.7 26.9 45.8 22.7 59.0 35.3 LOS C E C C D C D C E D Approach Delay 45.0 36.5 35.1 41.4 Approach LOS D D D D Intersection Summary Cycle Length: 120 Actuated Cycle Length: 113.2 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 38.3 Intersection LOS: D Intersection Capacity Utilization 84.0% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd Phasings AM 2028 Build w Mitigation 3: SC 6 & Industrial Dr/Glassmaster Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT Protected Phases 3 8 1 7 4 1 6 7 5 2 Permitted Phases 4 8 8 2 6 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 24.0 25.0 28.0 28.0 25.0 47.0 28.0 21.0 43.0 Total Split (%) 20.0% 20.0% 20.8% 23.3% 23.3% 20.8% 39.2% 23.3% 17.5% 35.8% Maximum Green (s) 18.0 18.0 19.0 22.0 22.0 19.0 41.0 22.0 15.0 37.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lag Lead Lead Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None None Min None None Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 90th %ile Green (s) 14.2 18.0 19.0 22.0 25.8 19.0 41.0 22.0 15.0 37.0 90th %ile Term Code Gap Max Max Max Hold Max Max Max Max Max 70th %ile Green (s) 12.0 18.0 17.4 22.0 28.0 17.4 41.0 22.0 15.0 38.6 70th %ile Term Code Gap Max Gap Max Hold Gap Max Max Max Hold 50th %ile Green (s) 10.5 18.0 15.1 21.3 28.8 15.1 41.0 21.3 15.0 40.9 50th %ile Term Code Gap Max Gap Gap Hold Gap Max Gap Max Hold 30th %ile Green (s) 8.9 18.0 12.9 18.8 27.9 12.9 37.9 18.8 15.0 40.0 30th %ile Term Code Gap Max Gap Gap Hold Gap Gap Gap Max Hold 10th %ile Green (s) 6.8 13.7 9.6 13.8 20.7 9.6 28.9 13.8 12.8 32.1 10th %ile Term Code Gap Gap Gap Gap Hold Gap Gap Gap Gap Hold Intersection Summary Cycle Length: 120 Actuated Cycle Length: 113.2 Control Type: Actuated-Uncoordinated 90th %ile Actuated Cycle: 120 70th %ile Actuated Cycle: 120 50th %ile Actuated Cycle: 119.3 30th %ile Actuated Cycle: 113.7 10th %ile Actuated Cycle: 93.2 Queues AM 2028 Build w Mitigation 3: SC 6 & Industrial Dr/Glassmaster Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Group Flow (vph) 113 239 390 540 253 256 1042 739 258 736 v/c Ratio 0.33 0.85 0.67 0.72 0.60 0.69 0.88 0.78 0.88 0.63 Control Delay 27.3 74.9 31.9 32.7 44.7 26.9 45.8 22.7 59.0 35.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 27.3 74.9 31.9 32.7 44.7 26.9 45.8 22.7 59.0 35.3 Queue Length 50th (ft) 57 182 206 156 163 107 390 344 141 244 Queue Length 95th (ft) 99 #323 308 204 262 163 484 521 #299 328 Internal Link Dist (ft) 665 963 493 629 Turn Bay Length (ft) 150 325 200 300 200 Base Capacity (vph) 447 298 643 833 428 438 1293 979 302 1209 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.25 0.80 0.61 0.65 0.59 0.58 0.81 0.75 0.85 0.61 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary AM 2028 Build w Mitigation 3: SC 6 & Industrial Dr/Glassmaster Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 102 215 351 486 167 60 230 938 665 232 614 49 Future Volume (veh/h) 102 215 351 486 167 60 230 938 665 232 614 49 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 113 239 390 540 186 67 256 1042 739 258 682 54 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 320 298 426 716 325 117 404 1291 820 288 1216 96 Arrive On Green 0.07 0.16 0.16 0.15 0.25 0.25 0.11 0.36 0.36 0.11 0.36 0.36 Sat Flow, veh/h 1781 1870 1585 3456 1312 473 1781 3554 1585 1781 3336 264 Grp Volume(v), veh/h 113 239 390 540 0 253 256 1042 739 258 363 373 Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1728 0 1785 1781 1777 1585 1781 1777 1823 Q Serve(g_s), s 5.3 13.9 18.0 14.4 0.0 14.0 10.0 29.8 41.0 10.3 18.4 18.5 Cycle Q Clear(g_c), s 5.3 13.9 18.0 14.4 0.0 14.0 10.0 29.8 41.0 10.3 18.4 18.5 Prop In Lane 1.00 1.00 1.00 0.26 1.00 1.00 1.00 0.14 Lane Grp Cap(c), veh/h 320 298 426 716 0 442 404 1291 820 288 648 664 V/C Ratio(X) 0.35 0.80 0.91 0.75 0.00 0.57 0.63 0.81 0.90 0.90 0.56 0.56 Avail Cap(c_a), veh/h 487 298 426 857 0 442 509 1291 820 327 648 664 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.4 45.7 40.0 32.8 0.0 37.2 20.6 32.4 24.7 26.1 28.7 28.7 Incr Delay (d2), s/veh 0.7 14.4 24.1 3.2 0.0 1.8 1.7 3.9 13.1 24.1 1.1 1.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 7.5 12.9 6.1 0.0 6.1 4.1 12.8 19.0 5.8 7.7 7.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 30.0 60.2 64.1 35.9 0.0 39.0 22.3 36.3 37.8 50.2 29.8 29.7 LnGrp LOS C E E D A D C D D D C C Approach Vol, veh/h 742 793 2037 994 Approach Delay, s/veh 57.7 36.9 35.1 35.1 Approach LOS E D D D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 18.4 47.1 13.4 34.0 18.5 47.0 23.4 24.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 19.0 37.0 18.0 22.0 15.0 41.0 22.0 18.0 Max Q Clear Time (g_c+I1), s 12.0 20.5 7.3 16.0 12.3 43.0 16.4 20.0 Green Ext Time (p_c), s 0.4 3.8 0.2 0.6 0.2 0.0 1.0 0.0 Intersection Summary HCM 6th Ctrl Delay 39.1 HCM 6th LOS D HCM 6th TWSC AM 2028 Build w Mitigation 6: Glassmaster Rd & Bruner Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Int Delay, s/veh 4.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 983 82 27 612 50 25 Future Vol, veh/h 983 82 27 612 50 25 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 150 - 100 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1092 91 30 680 56 28 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 1183 0 1878 1138 Stage 1 - - - - 1138 - Stage 2 - - - - 740 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 590 - 78 245 Stage 1 - - - - 306 - Stage 2 - - - - 472 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 590 - 74 245 Mov Cap-2 Maneuver - - - - 74 - Stage 1 - - - - 306 - Stage 2 - - - - 448 - Approach EB WB NB HCM Control Delay, s 0 0.5 98.9 HCM LOS F Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 74 245 - - 590 - HCM Lane V/C Ratio 0.751 0.113 - - 0.051 - HCM Control Delay (s) 137.5 21.6 - - 11.4 - HCM Lane LOS F C - - B - HCM 95th %tile Q(veh) 3.6 0.4 - - 0.2 - HCM 6th TWSC AM 2028 Build w Mitigation 9: Bruner Rd & School Access 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Int Delay, s/veh 13.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1025 20 19 0 0 620 Future Vol, veh/h 1025 20 19 0 0 620 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 100 - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1139 22 21 0 0 689 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 21 0 - 0 2321 21 Stage 1 - - - - 21 - Stage 2 - - - - 2300 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1595 - - - 41 1056 Stage 1 - - - - 1002 - Stage 2 - - - - 81 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1595 - - - 12 1056 Mov Cap-2 Maneuver - - - - 12 - Stage 1 - - - - 287 - Stage 2 - - - - 81 - Approach EB WB SB HCM Control Delay, s 12.4 0 14.6 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1595 - - - 1056 HCM Lane V/C Ratio 0.714 - - - 0.652 HCM Control Delay (s) 12.7 - - - 14.6 HCM Lane LOS B - - - B HCM 95th %tile Q(veh) 6.7 - - - 5.1 HCM 6th TWSC AM 2028 Build w Mitigation 10: SC 6 & Innovation Pl 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Int Delay, s/veh 7.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 115 309 999 170 95 829 Future Vol, veh/h 115 309 999 170 95 829 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 100 - 100 25 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 128 343 1110 189 106 921 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1783 555 0 0 1299 0 Stage 1 1110 - - - - - Stage 2 673 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver ~ 73 475 - - 529 - Stage 1 277 - - - - - Stage 2 468 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 58 475 - - 529 - Mov Cap-2 Maneuver 171 - - - - - Stage 1 277 - - - - - Stage 2 374 - - - - - Approach WB NB SB HCM Control Delay, s 41 0 1.4 HCM LOS E Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - - 171 475 529 - HCM Lane V/C Ratio - - 0.747 0.723 0.2 - HCM Control Delay (s) - - 70.7 29.9 13.5 - HCM Lane LOS - - F D B - HCM 95th %tile Q(veh) - - 4.7 5.8 0.7 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th Roundabout AM 2028 Build w Mitigation 11: School Access & Innov.Pl Connector 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Intersection Delay, s/veh 8.0 Intersection LOS A Approach EB NB SB Entry Lanes 1 1 1 Conflicting Circle Lanes 1 1 1 Adj Approach Flow, veh/h 27 705 660 Demand Flow Rate, veh/h 27 719 674 Vehicles Circulating, veh/h 436 14 8 Vehicles Exiting, veh/h 246 449 725 Ped Vol Crossing Leg, #/h 0 0 0 Ped Cap Adj 1.000 1.000 1.000 Approach Delay, s/veh 4.4 8.3 7.7 Approach LOS A A A Lane Left Left Left Designated Moves LR LT TR Assumed Moves LR LT TR RT Channelized Lane Util 1.000 1.000 1.000 Follow-Up Headway, s 2.609 2.609 2.609 Critical Headway, s 4.976 4.976 4.976 Entry Flow, veh/h 27 719 674 Cap Entry Lane, veh/h 885 1360 1369 Entry HV Adj Factor 1.000 0.981 0.980 Flow Entry, veh/h 27 705 660 Cap Entry, veh/h 885 1334 1341 V/C Ratio 0.031 0.529 0.492 Control Delay, s/veh 4.4 8.3 7.7 LOS A A A 95th %tile Queue, veh 0 3 3 HCM 6th TWSC AM 2028 Build w Mitigation 12: Innovation Pl & Innov.Pl Connector & Internal School Access 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Int Delay, s/veh 6.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 231 10 24 0 270 24 0 0 0 30 1 154 Future Vol, veh/h 231 10 24 0 270 24 0 0 0 30 1 154 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 257 11 27 0 300 27 0 0 0 33 1 171 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 327 0 0 38 0 0 939 866 25 853 866 314 Stage 1 - - - - - - 539 539 - 314 314 - Stage 2 - - - - - - 400 327 - 539 552 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1233 - - 1572 - - 244 291 1051 279 291 726 Stage 1 - - - - - - 527 522 - 697 656 - Stage 2 - - - - - - 626 648 - 527 515 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1233 - - 1572 - - 155 229 1051 233 229 726 Mov Cap-2 Maneuver - - - - - - 155 229 - 233 229 - Stage 1 - - - - - - 414 410 - 548 656 - Stage 2 - - - - - - 478 648 - 414 405 - Approach EB WB NB SB HCM Control Delay, s 7.6 0 0 15.8 HCM LOS A C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1233 - - 1572 - - 536 HCM Lane V/C Ratio - 0.208 - - - - - 0.383 HCM Control Delay (s) 0 8.7 0 - 0 - - 15.8 HCM Lane LOS A A A - A - - C HCM 95th %tile Q(veh) - 0.8 - - 0 - - 1.8 Timings PM 2026 Existing 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 61 256 333 85 230 861 193 73 858 Future Volume (vph) 61 256 333 85 230 861 193 73 858 Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Detector Phase 8 1 4 4 1 6 4 5 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0 Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None Min None None Min Act Effct Green (s) 14.7 34.8 16.0 16.0 47.2 42.5 64.5 48.7 33.2 Actuated g/C Ratio 0.14 0.34 0.16 0.16 0.46 0.42 0.63 0.48 0.32 v/c Ratio 0.69 0.48 0.69 0.48 0.82 0.65 0.20 0.31 0.88 Control Delay 57.5 21.4 49.3 41.6 47.6 28.4 1.8 16.7 43.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.5 21.4 49.3 41.6 47.6 28.4 1.8 16.7 43.0 LOS E C D D D C A B D Approach Delay 35.4 47.2 27.9 41.0 Approach LOS D D C D Intersection Summary Cycle Length: 111 Actuated Cycle Length: 102.2 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 35.8 Intersection LOS: D Intersection Capacity Utilization 76.2% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd Phasings PM 2026 Existing 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0 Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8% Maximum Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None Min None None Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 90th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 90th %ile Term Code Max Max Max Max Max Max Max Max Max 70th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 70th %ile Term Code Max Max Max Max Max Hold Max Max Max 50th %ile Green (s) 16.0 15.0 17.7 17.7 15.0 43.1 17.7 7.9 36.0 50th %ile Term Code Gap Max Gap Gap Max Hold Gap Gap Max 30th %ile Green (s) 13.2 14.5 15.5 15.5 14.5 40.6 15.5 6.9 33.0 30th %ile Term Code Gap Gap Gap Gap Gap Hold Gap Gap Gap 10th %ile Green (s) 9.3 10.4 11.1 11.1 10.4 41.6 11.1 0.0 25.2 10th %ile Term Code Gap Gap Gap Gap Gap Hold Gap Skip Gap Intersection Summary Cycle Length: 111 Actuated Cycle Length: 102.2 Control Type: Actuated-Uncoordinated 90th %ile Actuated Cycle: 111 70th %ile Actuated Cycle: 111 50th %ile Actuated Cycle: 108.7 30th %ile Actuated Cycle: 100.2 10th %ile Actuated Cycle: 80 Queues PM 2026 Existing 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Group Flow (vph) 180 284 370 141 256 957 214 81 1002 v/c Ratio 0.69 0.48 0.69 0.48 0.82 0.65 0.20 0.31 0.88 Control Delay 57.5 21.4 49.3 41.6 47.6 28.4 1.8 16.7 43.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.5 21.4 49.3 41.6 47.6 28.4 1.8 16.7 43.0 Queue Length 50th (ft) 121 105 126 78 120 285 0 27 340 Queue Length 95th (ft) 196 185 179 143 #261 378 30 54 #466 Internal Link Dist (ft) 665 963 493 629 Turn Bay Length (ft) 325 200 300 200 Base Capacity (vph) 323 615 614 331 333 1484 1109 286 1260 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.56 0.46 0.60 0.43 0.77 0.64 0.19 0.28 0.80 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary PM 2026 Existing 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 101 61 256 333 85 42 230 861 193 73 858 44 Future Volume (veh/h) 101 61 256 333 85 42 230 861 193 73 858 44 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 112 68 284 370 94 47 256 957 214 81 953 49 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 200 121 467 469 160 80 318 1395 837 237 1103 57 Arrive On Green 0.18 0.18 0.18 0.14 0.14 0.14 0.12 0.39 0.39 0.05 0.32 0.32 Sat Flow, veh/h 1129 685 1585 3456 1176 588 1781 3554 1585 1781 3439 177 Grp Volume(v), veh/h 180 0 284 370 0 141 256 957 214 81 492 510 Grp Sat Flow(s),veh/h/ln 1814 0 1585 1728 0 1764 1781 1777 1585 1781 1777 1839 Q Serve(g_s), s 8.8 0.0 14.9 10.0 0.0 7.2 9.1 21.6 7.1 2.6 25.1 25.1 Cycle Q Clear(g_c), s 8.8 0.0 14.9 10.0 0.0 7.2 9.1 21.6 7.1 2.6 25.1 25.1 Prop In Lane 0.62 1.00 1.00 0.33 1.00 1.00 1.00 0.10 Lane Grp Cap(c), veh/h 322 0 467 469 0 240 318 1395 837 237 570 590 V/C Ratio(X) 0.56 0.00 0.61 0.79 0.00 0.59 0.81 0.69 0.26 0.34 0.86 0.86 Avail Cap(c_a), veh/h 338 0 482 644 0 329 385 1546 905 321 662 685 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.3 0.0 29.2 40.4 0.0 39.2 22.4 24.4 12.4 18.9 30.8 30.8 Incr Delay (d2), s/veh 1.9 0.0 2.1 4.5 0.0 2.3 10.0 1.1 0.2 0.8 10.3 10.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.9 0.0 5.6 4.4 0.0 3.2 4.3 8.6 3.2 1.0 11.6 11.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 38.2 0.0 31.3 44.9 0.0 41.5 32.3 25.5 12.6 19.7 41.1 40.8 LnGrp LOS D A C D A D C C B B D D Approach Vol, veh/h 464 511 1427 1083 Approach Delay, s/veh 34.0 44.0 24.8 39.3 Approach LOS C D C D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 17.4 37.0 19.1 10.4 43.9 23.1 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 15.0 36.0 18.0 9.0 42.0 18.0 Max Q Clear Time (g_c+I1), s 11.1 27.1 12.0 4.6 23.6 16.9 Green Ext Time (p_c), s 0.3 3.8 1.1 0.1 6.7 0.3 Intersection Summary HCM 6th Ctrl Delay 33.3 HCM 6th LOS C HCM 6th TWSC PM 2026 Existing 6: Glassmaster Rd & Bruner Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 2.8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 270 58 63 300 56 49 Future Vol, veh/h 270 58 63 300 56 49 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 300 64 70 333 62 54 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 364 0 805 332 Stage 1 - - - - 332 - Stage 2 - - - - 473 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1195 - 352 710 Stage 1 - - - - 727 - Stage 2 - - - - 627 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1195 - 327 710 Mov Cap-2 Maneuver - - - - 327 - Stage 1 - - - - 727 - Stage 2 - - - - 582 - Approach EB WB NB HCM Control Delay, s 0 1.4 16.2 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 437 - - 1195 - HCM Lane V/C Ratio 0.267 - - 0.059 - HCM Control Delay (s) 16.2 - - 8.2 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 1.1 - - 0.2 - HCM 6th TWSC PM 2026 Existing 9: Bruner Rd & School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 8.4 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 256 73 14 42 4 404 Future Vol, veh/h 256 73 14 42 4 404 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 284 81 16 47 4 449 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 63 0 - 0 689 40 Stage 1 - - - - 40 - Stage 2 - - - - 649 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1540 - - - 412 1031 Stage 1 - - - - 982 - Stage 2 - - - - 520 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1540 - - - 332 1031 Mov Cap-2 Maneuver - - - - 332 - Stage 1 - - - - 792 - Stage 2 - - - - 520 - Approach EB WB SB HCM Control Delay, s 6.1 0 11.4 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1540 - - - 1010 HCM Lane V/C Ratio 0.185 - - - 0.449 HCM Control Delay (s) 7.9 0 - - 11.4 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0.7 - - - 2.4 HCM 6th TWSC PM 2026 Existing 10: SC 6 & Innovation Pl 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 2.5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 73 164 932 90 20 948 Future Vol, veh/h 73 164 932 90 20 948 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 100 - - 25 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 81 182 1036 100 22 1053 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1657 568 0 0 1136 0 Stage 1 1086 - - - - - Stage 2 571 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 89 466 - - 611 - Stage 1 285 - - - - - Stage 2 529 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 86 466 - - 611 - Mov Cap-2 Maneuver 202 - - - - - Stage 1 285 - - - - - Stage 2 510 - - - - - Approach WB NB SB HCM Control Delay, s 22.7 0 0.2 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - - 202 466 611 - HCM Lane V/C Ratio - - 0.402 0.391 0.036 - HCM Control Delay (s) - - 34.3 17.6 11.1 - HCM Lane LOS - - D C B - HCM 95th %tile Q(veh) - - 1.8 1.8 0.1 - HCM 6th Roundabout PM 2026 Existing 11: School Access/6-12 & Innov.Pl Connector/K-5 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Intersection Delay, s/veh 5.4 Intersection LOS A Approach EB WB NB SB Entry Lanes 1 1 1 1 Conflicting Circle Lanes 1 1 1 1 Adj Approach Flow, veh/h 63 254 407 245 Demand Flow Rate, veh/h 64 259 414 250 Vehicles Circulating, veh/h 352 200 13 275 Vehicles Exiting, veh/h 173 227 403 184 Ped Vol Crossing Leg, #/h 0 0 0 0 Ped Cap Adj 1.000 1.000 1.000 1.000 Approach Delay, s/veh 4.4 5.4 5.4 5.8 Approach LOS A A A A Lane Left Left Left Left Designated Moves LTR LTR LTR LTR Assumed Moves LTR LTR LTR LTR RT Channelized Lane Util 1.000 1.000 1.000 1.000 Follow-Up Headway, s 2.609 2.609 2.609 2.609 Critical Headway, s 4.976 4.976 4.976 4.976 Entry Flow, veh/h 64 259 414 250 Cap Entry Lane, veh/h 964 1125 1362 1042 Entry HV Adj Factor 0.983 0.979 0.982 0.979 Flow Entry, veh/h 63 254 407 245 Cap Entry, veh/h 948 1102 1337 1021 V/C Ratio 0.066 0.230 0.304 0.240 Control Delay, s/veh 4.4 5.4 5.4 5.8 LOS A A A A 95th %tile Queue, veh 0 1 1 1 HCM 6th TWSC PM 2026 Existing 12: Innovation Pl & Innov.Pl Connector & Internal School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 6.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 102 6 0 0 119 29 0 0 0 51 1 115 Future Vol, veh/h 102 6 0 0 119 29 0 0 0 51 1 115 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 113 7 0 0 132 32 0 0 0 57 1 128 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 164 0 0 7 0 0 446 397 7 381 381 148 Stage 1 - - - - - - 233 233 - 148 148 - Stage 2 - - - - - - 213 164 - 233 233 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1414 - - 1614 - - 523 540 1075 577 552 899 Stage 1 - - - - - - 770 712 - 855 775 - Stage 2 - - - - - - 789 762 - 770 712 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1414 - - 1614 - - 420 497 1075 542 508 899 Mov Cap-2 Maneuver - - - - - - 420 497 - 542 508 - Stage 1 - - - - - - 708 655 - 787 775 - Stage 2 - - - - - - 676 762 - 708 655 - Approach EB WB NB SB HCM Control Delay, s 7.3 0 0 11.4 HCM LOS A B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1414 - - 1614 - - 746 HCM Lane V/C Ratio - 0.08 - - - - - 0.249 HCM Control Delay (s) 0 7.8 0 - 0 - - 11.4 HCM Lane LOS A A A - A - - B HCM 95th %tile Q(veh) - 0.3 - - 0 - - 1 Timings PM 2028 Background 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 63 264 343 88 237 887 199 75 884 Future Volume (vph) 63 264 343 88 237 887 199 75 884 Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Detector Phase 8 1 4 4 1 6 4 5 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0 Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None Min None None Min Act Effct Green (s) 14.9 35.2 16.2 16.2 48.3 43.5 65.8 49.8 34.1 Actuated g/C Ratio 0.14 0.34 0.16 0.16 0.47 0.42 0.63 0.48 0.33 v/c Ratio 0.72 0.49 0.71 0.50 0.85 0.66 0.20 0.32 0.89 Control Delay 59.4 22.2 50.6 42.5 51.3 28.9 1.8 17.1 44.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.4 22.2 50.6 42.5 51.3 28.9 1.8 17.1 44.4 LOS E C D D D C A B D Approach Delay 36.6 48.4 28.8 42.4 Approach LOS D D C D Intersection Summary Cycle Length: 111 Actuated Cycle Length: 103.7 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 36.9 Intersection LOS: D Intersection Capacity Utilization 77.9% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd Phasings PM 2028 Background 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0 Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8% Maximum Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None Min None None Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 90th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 90th %ile Term Code Max Max Max Max Max Max Max Max Max 70th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 70th %ile Term Code Max Max Max Max Max Hold Max Max Max 50th %ile Green (s) 16.4 15.0 18.0 18.0 15.0 43.0 18.0 8.0 36.0 50th %ile Term Code Gap Max Max Max Max Hold Max Gap Max 30th %ile Green (s) 13.6 15.0 15.9 15.9 15.0 43.9 15.9 7.0 35.9 30th %ile Term Code Gap Max Gap Gap Max Hold Gap Gap Gap 10th %ile Green (s) 9.6 10.9 11.4 11.4 10.9 43.7 11.4 0.0 26.8 10th %ile Term Code Gap Gap Gap Gap Gap Hold Gap Skip Gap Intersection Summary Cycle Length: 111 Actuated Cycle Length: 103.7 Control Type: Actuated-Uncoordinated 90th %ile Actuated Cycle: 111 70th %ile Actuated Cycle: 111 50th %ile Actuated Cycle: 109.4 30th %ile Actuated Cycle: 104.4 10th %ile Actuated Cycle: 82.7 Queues PM 2028 Background 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Group Flow (vph) 186 293 381 146 263 986 221 83 1032 v/c Ratio 0.72 0.49 0.71 0.50 0.85 0.66 0.20 0.32 0.89 Control Delay 59.4 22.2 50.6 42.5 51.3 28.9 1.8 17.1 44.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.4 22.2 50.6 42.5 51.3 28.9 1.8 17.1 44.4 Queue Length 50th (ft) 125 111 130 81 128 301 0 28 357 Queue Length 95th (ft) 203 193 185 148 #278 393 30 55 #491 Internal Link Dist (ft) 665 963 493 629 Turn Bay Length (ft) 325 200 300 200 Base Capacity (vph) 317 610 603 327 327 1485 1111 277 1238 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.59 0.48 0.63 0.45 0.80 0.66 0.20 0.30 0.83 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary PM 2028 Background 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 104 63 264 343 88 43 237 887 199 75 884 45 Future Volume (veh/h) 104 63 264 343 88 43 237 887 199 75 884 45 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 116 70 293 381 98 48 263 986 221 83 982 50 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 203 122 473 475 163 80 313 1413 848 229 1114 57 Arrive On Green 0.18 0.18 0.18 0.14 0.14 0.14 0.12 0.40 0.40 0.05 0.32 0.32 Sat Flow, veh/h 1131 683 1585 3456 1185 581 1781 3554 1585 1781 3440 175 Grp Volume(v), veh/h 186 0 293 381 0 146 263 986 221 83 507 525 Grp Sat Flow(s),veh/h/ln 1814 0 1585 1728 0 1766 1781 1777 1585 1781 1777 1839 Q Serve(g_s), s 9.4 0.0 15.9 10.7 0.0 7.8 9.6 23.1 7.5 2.7 27.0 27.0 Cycle Q Clear(g_c), s 9.4 0.0 15.9 10.7 0.0 7.8 9.6 23.1 7.5 2.7 27.0 27.0 Prop In Lane 0.62 1.00 1.00 0.33 1.00 1.00 1.00 0.10 Lane Grp Cap(c), veh/h 325 0 473 475 0 243 313 1413 848 229 575 595 V/C Ratio(X) 0.57 0.00 0.62 0.80 0.00 0.60 0.84 0.70 0.26 0.36 0.88 0.88 Avail Cap(c_a), veh/h 327 0 474 623 0 318 369 1495 885 310 641 663 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 37.5 0.0 30.2 41.7 0.0 40.5 23.1 25.1 12.5 19.5 31.9 31.9 Incr Delay (d2), s/veh 2.4 0.0 2.5 5.6 0.0 2.4 13.9 1.4 0.2 1.0 12.6 12.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.2 0.0 6.0 4.7 0.0 3.4 4.9 9.2 3.4 1.1 12.8 13.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 39.8 0.0 32.6 47.4 0.0 42.9 37.0 26.4 12.7 20.5 44.6 44.2 LnGrp LOS D A C D A D D C B C D D Approach Vol, veh/h 479 527 1470 1115 Approach Delay, s/veh 35.4 46.1 26.3 42.6 Approach LOS D D C D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 17.9 38.3 19.7 10.5 45.7 23.9 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 15.0 36.0 18.0 9.0 42.0 18.0 Max Q Clear Time (g_c+I1), s 11.6 29.0 12.7 4.7 25.1 17.9 Green Ext Time (p_c), s 0.2 3.4 1.1 0.1 6.7 0.0 Intersection Summary HCM 6th Ctrl Delay 35.5 HCM 6th LOS D HCM 6th TWSC PM 2028 Background 6: Glassmaster Rd & Bruner Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 1.8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 278 60 20 410 58 20 Future Vol, veh/h 278 60 20 410 58 20 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 309 67 22 456 64 22 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 376 0 843 343 Stage 1 - - - - 343 - Stage 2 - - - - 500 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1182 - 334 700 Stage 1 - - - - 719 - Stage 2 - - - - 609 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1182 - 326 700 Mov Cap-2 Maneuver - - - - 326 - Stage 1 - - - - 719 - Stage 2 - - - - 594 - Approach EB WB NB HCM Control Delay, s 0 0.4 17.3 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 378 - - 1182 - HCM Lane V/C Ratio 0.229 - - 0.019 - HCM Control Delay (s) 17.3 - - 8.1 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 0.9 - - 0.1 - HCM 6th TWSC PM 2028 Background 9: Bruner Rd & School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 9.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 335 20 14 0 0 420 Future Vol, veh/h 335 20 14 0 0 420 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 372 22 16 0 0 467 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 16 0 - 0 782 16 Stage 1 - - - - 16 - Stage 2 - - - - 766 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1602 - - - 363 1063 Stage 1 - - - - 1007 - Stage 2 - - - - 459 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1602 - - - 278 1063 Mov Cap-2 Maneuver - - - - 278 - Stage 1 - - - - 770 - Stage 2 - - - - 459 - Approach EB WB SB HCM Control Delay, s 7.5 0 11 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1602 - - - 1063 HCM Lane V/C Ratio 0.232 - - - 0.439 HCM Control Delay (s) 7.9 0 - - 11 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0.9 - - - 2.3 HCM 6th TWSC PM 2028 Background 10: SC 6 & Innovation Pl 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 2.7 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 75 169 960 93 21 976 Future Vol, veh/h 75 169 960 93 21 976 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 100 - - 25 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 83 188 1067 103 23 1084 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1707 585 0 0 1170 0 Stage 1 1119 - - - - - Stage 2 588 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver ~ 82 454 - - 593 - Stage 1 274 - - - - - Stage 2 518 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 79 454 - - 593 - Mov Cap-2 Maneuver 194 - - - - - Stage 1 274 - - - - - Stage 2 498 - - - - - Approach WB NB SB HCM Control Delay, s 24.1 0 0.2 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - - 194 454 593 - HCM Lane V/C Ratio - - 0.43 0.414 0.039 - HCM Control Delay (s) - - 36.8 18.4 11.3 - HCM Lane LOS - - E C B - HCM 95th %tile Q(veh) - - 2 2 0.1 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th Roundabout PM 2028 Background 11: School Access/6-12 & Innov.Pl Connector/K-5 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Intersection Delay, s/veh 5.4 Intersection LOS A Approach EB WB NB SB Entry Lanes 1 1 1 1 Conflicting Circle Lanes 1 1 1 1 Adj Approach Flow, veh/h 63 254 407 245 Demand Flow Rate, veh/h 64 259 414 250 Vehicles Circulating, veh/h 352 200 13 275 Vehicles Exiting, veh/h 173 227 403 184 Ped Vol Crossing Leg, #/h 0 0 0 0 Ped Cap Adj 1.000 1.000 1.000 1.000 Approach Delay, s/veh 4.4 5.4 5.4 5.8 Approach LOS A A A A Lane Left Left Left Left Designated Moves LTR LTR LTR LTR Assumed Moves LTR LTR LTR LTR RT Channelized Lane Util 1.000 1.000 1.000 1.000 Follow-Up Headway, s 2.609 2.609 2.609 2.609 Critical Headway, s 4.976 4.976 4.976 4.976 Entry Flow, veh/h 64 259 414 250 Cap Entry Lane, veh/h 964 1125 1362 1042 Entry HV Adj Factor 0.983 0.979 0.982 0.979 Flow Entry, veh/h 63 254 407 245 Cap Entry, veh/h 948 1102 1337 1021 V/C Ratio 0.066 0.230 0.304 0.240 Control Delay, s/veh 4.4 5.4 5.4 5.8 LOS A A A A 95th %tile Queue, veh 0 1 1 1 HCM 6th TWSC PM 2028 Background 12: Innovation Pl & Innov.Pl Connector & Internal School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 6.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 102 6 0 0 119 29 0 0 0 51 1 115 Future Vol, veh/h 102 6 0 0 119 29 0 0 0 51 1 115 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 113 7 0 0 132 32 0 0 0 57 1 128 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 164 0 0 7 0 0 446 397 7 381 381 148 Stage 1 - - - - - - 233 233 - 148 148 - Stage 2 - - - - - - 213 164 - 233 233 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1414 - - 1614 - - 523 540 1075 577 552 899 Stage 1 - - - - - - 770 712 - 855 775 - Stage 2 - - - - - - 789 762 - 770 712 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1414 - - 1614 - - 420 497 1075 542 508 899 Mov Cap-2 Maneuver - - - - - - 420 497 - 542 508 - Stage 1 - - - - - - 708 655 - 787 775 - Stage 2 - - - - - - 676 762 - 708 655 - Approach EB WB NB SB HCM Control Delay, s 7.3 0 0 11.4 HCM LOS A B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1414 - - 1614 - - 746 HCM Lane V/C Ratio - 0.08 - - - - - 0.249 HCM Control Delay (s) 0 7.8 0 - 0 - - 11.4 HCM Lane LOS A A A - A - - B HCM 95th %tile Q(veh) - 0.3 - - 0 - - 1 Timings PM 2028 Build 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 91 264 507 145 237 933 311 124 915 Future Volume (vph) 91 264 507 145 237 933 311 124 915 Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Detector Phase 8 1 4 4 1 6 4 5 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0 Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None Min None None Min Act Effct Green (s) 16.1 36.4 18.1 18.1 49.3 40.8 64.9 49.3 35.0 Actuated g/C Ratio 0.15 0.34 0.17 0.17 0.46 0.38 0.60 0.46 0.33 v/c Ratio 0.78 0.49 0.98 0.75 0.87 0.77 0.32 0.62 0.93 Control Delay 64.3 22.5 78.2 56.3 54.5 34.3 1.9 28.5 50.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 64.3 22.5 78.2 56.3 54.5 34.3 1.9 28.5 50.6 LOS E C E E D C A C D Approach Delay 40.0 71.8 30.7 48.1 Approach LOS D E C D Intersection Summary Cycle Length: 111 Actuated Cycle Length: 107.5 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 44.7 Intersection LOS: D Intersection Capacity Utilization 84.7% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd Phasings PM 2028 Build 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Protected Phases 8 1 4 4 1 6 4 5 2 Permitted Phases 8 2 6 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0 Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8% Maximum Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None Min None None Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 90th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 90th %ile Term Code Max Max Max Max Max Max Max Max Max 70th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 70th %ile Term Code Max Max Max Max Max Max Max Max Max 50th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0 50th %ile Term Code Max Max Max Max Max Hold Max Max Max 30th %ile Green (s) 15.6 15.0 18.0 18.0 15.0 42.4 18.0 8.6 36.0 30th %ile Term Code Gap Max Max Max Max Hold Max Gap Max 10th %ile Green (s) 11.4 11.5 18.0 18.0 11.5 35.8 18.0 6.9 31.2 10th %ile Term Code Gap Gap Max Max Gap Hold Max Gap Gap Intersection Summary Cycle Length: 111 Actuated Cycle Length: 107.5 Control Type: Actuated-Uncoordinated 90th %ile Actuated Cycle: 111 70th %ile Actuated Cycle: 111 50th %ile Actuated Cycle: 111 30th %ile Actuated Cycle: 108.6 10th %ile Actuated Cycle: 96.1 Queues PM 2028 Build 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Group Flow (vph) 211 293 563 233 263 1037 346 138 1071 v/c Ratio 0.78 0.49 0.98 0.75 0.87 0.77 0.32 0.62 0.93 Control Delay 64.3 22.5 78.2 56.3 54.5 34.3 1.9 28.5 50.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 64.3 22.5 78.2 56.3 54.5 34.3 1.9 28.5 50.6 Queue Length 50th (ft) 144 111 ~212 149 131 337 0 50 386 Queue Length 95th (ft) #245 193 #328 #268 #276 421 36 94 #523 Internal Link Dist (ft) 665 963 493 629 Turn Bay Length (ft) 325 200 300 200 Base Capacity (vph) 304 604 576 312 316 1389 1092 233 1182 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.69 0.49 0.98 0.75 0.83 0.75 0.32 0.59 0.91 Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary PM 2028 Build 3: SC 6 & Industrial Dr/Glassmaster Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 99 91 264 507 145 65 237 933 311 124 915 49 Future Volume (veh/h) 99 91 264 507 145 65 237 933 311 124 915 49 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 110 101 293 563 161 72 263 1037 346 138 1017 54 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 160 147 453 581 206 92 296 1331 860 229 1106 59 Arrive On Green 0.17 0.17 0.17 0.17 0.17 0.17 0.12 0.37 0.37 0.07 0.32 0.32 Sat Flow, veh/h 950 873 1585 3456 1224 548 1781 3554 1585 1781 3432 182 Grp Volume(v), veh/h 211 0 293 563 0 233 263 1037 346 138 526 545 Grp Sat Flow(s),veh/h/ln 1823 0 1585 1728 0 1772 1781 1777 1585 1781 1777 1838 Q Serve(g_s), s 11.7 0.0 17.4 17.3 0.0 13.5 10.4 27.6 13.7 5.0 30.6 30.6 Cycle Q Clear(g_c), s 11.7 0.0 17.4 17.3 0.0 13.5 10.4 27.6 13.7 5.0 30.6 30.6 Prop In Lane 0.52 1.00 1.00 0.31 1.00 1.00 1.00 0.10 Lane Grp Cap(c), veh/h 306 0 453 581 0 298 296 1331 860 229 573 592 V/C Ratio(X) 0.69 0.00 0.65 0.97 0.00 0.78 0.89 0.78 0.40 0.60 0.92 0.92 Avail Cap(c_a), veh/h 306 0 453 581 0 298 336 1393 888 263 597 618 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.9 0.0 33.5 44.3 0.0 42.7 25.1 29.6 14.3 23.7 34.9 35.0 Incr Delay (d2), s/veh 6.4 0.0 3.2 29.7 0.0 12.7 22.2 2.8 0.3 3.0 19.1 18.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.6 0.0 6.8 9.5 0.0 6.7 5.9 11.5 6.7 2.1 15.4 15.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 48.3 0.0 36.7 73.9 0.0 55.4 47.3 32.3 14.6 26.6 54.0 53.6 LnGrp LOS D A D E A E D C B C D D Approach Vol, veh/h 504 796 1646 1209 Approach Delay, s/veh 41.6 68.5 31.0 50.7 Approach LOS D E C D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 18.6 40.5 24.0 13.0 46.1 24.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 15.0 36.0 18.0 9.0 42.0 18.0 Max Q Clear Time (g_c+I1), s 12.4 32.6 19.3 7.0 29.6 19.4 Green Ext Time (p_c), s 0.2 2.0 0.0 0.1 6.3 0.0 Intersection Summary HCM 6th Ctrl Delay 45.2 HCM 6th LOS D HCM 6th TWSC PM 2028 Build 6: Glassmaster Rd & Bruner Rd 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 2.8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 466 68 28 661 61 23 Future Vol, veh/h 466 68 28 661 61 23 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 518 76 31 734 68 26 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 594 0 1352 556 Stage 1 - - - - 556 - Stage 2 - - - - 796 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 982 - 165 531 Stage 1 - - - - 574 - Stage 2 - - - - 444 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 982 - 156 531 Mov Cap-2 Maneuver - - - - 156 - Stage 1 - - - - 574 - Stage 2 - - - - 420 - Approach EB WB NB HCM Control Delay, s 0 0.4 40 HCM LOS E Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 193 - - 982 - HCM Lane V/C Ratio 0.484 - - 0.032 - HCM Control Delay (s) 40 - - 8.8 0 HCM Lane LOS E - - A A HCM 95th %tile Q(veh) 2.4 - - 0.1 - HCM 6th TWSC PM 2028 Build 9: Bruner Rd & School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 12.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 526 20 14 0 0 668 Future Vol, veh/h 526 20 14 0 0 668 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 584 22 16 0 0 742 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 16 0 - 0 1206 16 Stage 1 - - - - 16 - Stage 2 - - - - 1190 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1602 - - - 203 1063 Stage 1 - - - - 1007 - Stage 2 - - - - 289 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1602 - - - 128 1063 Mov Cap-2 Maneuver - - - - 128 - Stage 1 - - - - 635 - Stage 2 - - - - 289 - Approach EB WB SB HCM Control Delay, s 8.2 0 15.8 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1602 - - - 1063 HCM Lane V/C Ratio 0.365 - - - 0.698 HCM Control Delay (s) 8.5 0 - - 15.8 HCM Lane LOS A A - - C HCM 95th %tile Q(veh) 1.7 - - - 6 HCM 6th TWSC PM 2028 Build 10: SC 6 & Innovation Pl 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 6.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 117 261 979 146 31 1017 Future Vol, veh/h 117 261 979 146 31 1017 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 100 - - 25 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 130 290 1088 162 34 1130 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1802 625 0 0 1250 0 Stage 1 1169 - - - - - Stage 2 633 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver ~ 71 428 - - 553 - Stage 1 258 - - - - - Stage 2 491 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 67 428 - - 553 - Mov Cap-2 Maneuver 179 - - - - - Stage 1 258 - - - - - Stage 2 461 - - - - - Approach WB NB SB HCM Control Delay, s 40.4 0 0.4 HCM LOS E Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - - 179 428 553 - HCM Lane V/C Ratio - - 0.726 0.678 0.062 - HCM Control Delay (s) - - 65.3 29.3 11.9 - HCM Lane LOS - - F D B - HCM 95th %tile Q(veh) - - 4.6 4.9 0.2 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th Roundabout PM 2028 Build 11: School Access/6-12 & Innov.Pl Connector/K-5 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Intersection Delay, s/veh 9.3 Intersection LOS A Approach EB WB NB SB Entry Lanes 1 1 1 1 Conflicting Circle Lanes 1 1 1 1 Adj Approach Flow, veh/h 103 460 584 444 Demand Flow Rate, veh/h 105 469 595 453 Vehicles Circulating, veh/h 665 370 13 490 Vehicles Exiting, veh/h 278 238 757 349 Ped Vol Crossing Leg, #/h 0 0 0 0 Ped Cap Adj 1.000 1.000 1.000 1.000 Approach Delay, s/veh 6.9 10.1 7.0 12.1 Approach LOS A B A B Lane Left Left Left Left Designated Moves LTR LTR LTR LTR Assumed Moves LTR LTR LTR LTR RT Channelized Lane Util 1.000 1.000 1.000 1.000 Follow-Up Headway, s 2.609 2.609 2.609 2.609 Critical Headway, s 4.976 4.976 4.976 4.976 Entry Flow, veh/h 105 469 595 453 Cap Entry Lane, veh/h 700 946 1362 837 Entry HV Adj Factor 0.980 0.980 0.982 0.980 Flow Entry, veh/h 103 460 584 444 Cap Entry, veh/h 686 927 1337 820 V/C Ratio 0.150 0.496 0.437 0.541 Control Delay, s/veh 6.9 10.1 7.0 12.1 LOS A B A B 95th %tile Queue, veh 1 3 2 3 HCM 6th TWSC PM 2028 Build 12: Innovation Pl & Innov.Pl Connector & Internal School Access 04/20/2026 213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report Intersection Int Delay, s/veh 9.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 168 9 0 0 192 53 0 0 0 83 2 186 Future Vol, veh/h 168 9 0 0 192 53 0 0 0 83 2 186 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 187 10 0 0 213 59 0 0 0 92 2 207 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 272 0 0 10 0 0 731 656 10 627 627 243 Stage 1 - - - - - - 384 384 - 243 243 - Stage 2 - - - - - - 347 272 - 384 384 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1291 - - 1610 - - 337 385 1071 396 400 796 Stage 1 - - - - - - 639 611 - 761 705 - Stage 2 - - - - - - 669 685 - 639 611 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1291 - - 1610 - - 220 329 1071 352 342 796 Mov Cap-2 Maneuver - - - - - - 220 329 - 352 342 - Stage 1 - - - - - - 546 522 - 650 705 - Stage 2 - - - - - - 494 685 - 546 522 - Approach EB WB NB SB HCM Control Delay, s 7.8 0 0 18.2 HCM LOS A C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1291 - - 1610 - - 570 HCM Lane V/C Ratio - 0.145 - - - - - 0.528 HCM Control Delay (s) 0 8.3 0 - 0 - - 18.2 HCM Lane LOS A A A - A - - C HCM 95th %tile Q(veh) - 0.5 - - 0 - - 3.1 Timings PM 2028 Build w Mitigation 3: SC 6 & Industrial Dr/Glassmaster Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 99 91 264 507 145 237 933 311 124 915 Future Volume (vph) 99 91 264 507 145 237 933 311 124 915 Turn Type D.P+P NA pm+ov D.P+P NA D.P+P NA pm+ov D.P+P NA Protected Phases 3 8 1 7 4 1 6 7 5 2 Permitted Phases 4 8 8 2 6 6 Detector Phase 3 8 1 7 4 1 6 7 5 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 24.0 25.0 28.0 28.0 25.0 47.0 28.0 21.0 43.0 Total Split (%) 20.0% 20.0% 20.8% 23.3% 23.3% 20.8% 39.2% 23.3% 17.5% 35.8% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lag Lead Lead Lag Lead-Lag Optimize? Recall Mode None None None None None None Min None None Min Act Effct Green (s) 30.3 11.2 33.0 30.3 20.2 52.3 42.2 67.3 52.3 36.6 Actuated g/C Ratio 0.28 0.10 0.31 0.28 0.19 0.49 0.39 0.63 0.49 0.34 v/c Ratio 0.35 0.52 0.54 0.64 0.67 0.80 0.74 0.31 0.52 0.89 Control Delay 28.7 56.7 25.6 31.9 48.7 44.9 33.1 1.9 21.3 44.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 28.7 56.7 25.6 31.9 48.7 44.9 33.1 1.9 21.3 44.9 LOS C E C C D D C A C D Approach Delay 32.5 36.8 28.4 42.2 Approach LOS C D C D Intersection Summary Cycle Length: 120 Actuated Cycle Length: 106.9 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 34.5 Intersection LOS: C Intersection Capacity Utilization 79.2% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd Phasings PM 2028 Build w Mitigation 3: SC 6 & Industrial Dr/Glassmaster Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT Protected Phases 3 8 1 7 4 1 6 7 5 2 Permitted Phases 4 8 8 2 6 6 Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 24.0 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0 Total Split (s) 24.0 24.0 25.0 28.0 28.0 25.0 47.0 28.0 21.0 43.0 Total Split (%) 20.0% 20.0% 20.8% 23.3% 23.3% 20.8% 39.2% 23.3% 17.5% 35.8% Maximum Green (s) 18.0 18.0 19.0 22.0 22.0 19.0 41.0 22.0 15.0 37.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lag Lead Lead Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Recall Mode None None None None None None Min None None Min Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 90th %ile Green (s) 14.0 16.1 19.0 22.0 24.1 19.0 41.0 22.0 15.0 37.0 90th %ile Term Code Gap Gap Max Max Hold Max Max Max Max Max 70th %ile Green (s) 11.8 13.3 19.0 22.0 23.5 19.0 44.2 22.0 11.8 37.0 70th %ile Term Code Gap Gap Max Max Hold Max Hold Max Gap Max 50th %ile Green (s) 10.3 11.4 17.9 20.8 21.9 17.9 45.2 20.8 9.7 37.0 50th %ile Term Code Gap Gap Gap Gap Hold Gap Hold Gap Gap Max 30th %ile Green (s) 8.7 9.4 14.1 18.1 18.8 14.1 42.8 18.1 8.3 37.0 30th %ile Term Code Gap Gap Gap Gap Hold Gap Hold Gap Gap Max 10th %ile Green (s) 6.7 6.9 9.7 13.4 13.6 9.7 36.6 13.4 6.7 33.6 10th %ile Term Code Gap Gap Gap Gap Hold Gap Hold Gap Gap Gap Intersection Summary Cycle Length: 120 Actuated Cycle Length: 106.9 Control Type: Actuated-Uncoordinated 90th %ile Actuated Cycle: 118.1 70th %ile Actuated Cycle: 115.3 50th %ile Actuated Cycle: 111.1 30th %ile Actuated Cycle: 102.6 10th %ile Actuated Cycle: 87.6 Queues PM 2028 Build w Mitigation 3: SC 6 & Industrial Dr/Glassmaster Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT Lane Group Flow (vph) 110 101 293 563 233 263 1037 346 138 1071 v/c Ratio 0.35 0.52 0.54 0.64 0.67 0.80 0.74 0.31 0.52 0.89 Control Delay 28.7 56.7 25.6 31.9 48.7 44.9 33.1 1.9 21.3 44.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 28.7 56.7 25.6 31.9 48.7 44.9 33.1 1.9 21.3 44.9 Queue Length 50th (ft) 55 70 121 161 144 126 321 0 46 381 Queue Length 95th (ft) 98 127 208 213 239 #257 469 38 90 #567 Internal Link Dist (ft) 665 963 493 629 Turn Bay Length (ft) 150 325 200 300 200 Base Capacity (vph) 427 316 594 962 393 386 1431 1161 346 1232 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.26 0.32 0.49 0.59 0.59 0.68 0.72 0.30 0.40 0.87 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM 6th Signalized Intersection Summary PM 2028 Build w Mitigation 3: SC 6 & Industrial Dr/Glassmaster Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 99 91 264 507 145 65 237 933 311 124 915 49 Future Volume (veh/h) 99 91 264 507 145 65 237 933 311 124 915 49 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 110 101 293 563 161 72 263 1037 346 138 1017 54 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 358 316 456 922 324 145 302 1348 855 234 1122 60 Arrive On Green 0.06 0.17 0.17 0.16 0.26 0.26 0.12 0.38 0.38 0.07 0.33 0.33 Sat Flow, veh/h 1781 1870 1585 3456 1224 548 1781 3554 1585 1781 3432 182 Grp Volume(v), veh/h 110 101 293 563 0 233 263 1037 346 138 526 545 Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1728 0 1772 1781 1777 1585 1781 1777 1838 Q Serve(g_s), s 4.7 5.0 17.2 13.9 0.0 11.9 10.2 27.2 13.7 5.0 30.2 30.2 Cycle Q Clear(g_c), s 4.7 5.0 17.2 13.9 0.0 11.9 10.2 27.2 13.7 5.0 30.2 30.2 Prop In Lane 1.00 1.00 1.00 0.31 1.00 1.00 1.00 0.10 Lane Grp Cap(c), veh/h 358 316 456 922 0 469 302 1348 855 234 581 600 V/C Ratio(X) 0.31 0.32 0.64 0.61 0.00 0.50 0.87 0.77 0.40 0.59 0.91 0.91 Avail Cap(c_a), veh/h 545 316 456 1083 0 469 408 1369 864 367 618 639 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.3 38.9 33.1 28.8 0.0 33.1 24.7 28.9 14.4 23.1 34.3 34.3 Incr Delay (d2), s/veh 0.5 0.6 3.1 0.8 0.0 0.8 14.3 2.7 0.3 2.4 16.6 16.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 2.3 6.7 5.6 0.0 5.0 5.2 11.3 4.5 2.1 14.9 15.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 26.7 39.4 36.2 29.5 0.0 34.0 39.0 31.6 14.7 25.5 50.9 50.5 LnGrp LOS C D D C A C D C B C D D Approach Vol, veh/h 504 796 1646 1209 Approach Delay, s/veh 34.8 30.8 29.3 47.8 Approach LOS C C C D Timer - Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 18.6 40.8 12.9 34.2 13.0 46.4 23.0 24.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 19.0 37.0 18.0 22.0 15.0 41.0 22.0 18.0 Max Q Clear Time (g_c+I1), s 12.2 32.2 6.7 13.9 7.0 29.2 15.9 19.2 Green Ext Time (p_c), s 0.4 2.6 0.2 0.7 0.2 6.1 1.1 0.0 Intersection Summary HCM 6th Ctrl Delay 35.6 HCM 6th LOS D HCM 6th TWSC PM 2028 Build w Mitigation 6: Glassmaster Rd & Bruner Rd 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Int Delay, s/veh 2.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 466 68 28 661 61 23 Future Vol, veh/h 466 68 28 661 61 23 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 150 - 100 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 518 76 31 734 68 26 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 594 0 1352 556 Stage 1 - - - - 556 - Stage 2 - - - - 796 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 982 - 165 531 Stage 1 - - - - 574 - Stage 2 - - - - 444 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 982 - 160 531 Mov Cap-2 Maneuver - - - - 160 - Stage 1 - - - - 574 - Stage 2 - - - - 430 - Approach EB WB NB HCM Control Delay, s 0 0.4 34.6 HCM LOS D Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 160 531 - - 982 - HCM Lane V/C Ratio 0.424 0.048 - - 0.032 - HCM Control Delay (s) 43.1 12.1 - - 8.8 - HCM Lane LOS E B - - A - HCM 95th %tile Q(veh) 1.9 0.2 - - 0.1 - HCM 6th TWSC PM 2028 Build w Mitigation 9: Bruner Rd & School Access 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Int Delay, s/veh 12.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 526 20 14 0 0 668 Future Vol, veh/h 526 20 14 0 0 668 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 100 - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 584 22 16 0 0 742 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 16 0 - 0 1206 16 Stage 1 - - - - 16 - Stage 2 - - - - 1190 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1602 - - - 203 1063 Stage 1 - - - - 1007 - Stage 2 - - - - 289 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1602 - - - 129 1063 Mov Cap-2 Maneuver - - - - 129 - Stage 1 - - - - 639 - Stage 2 - - - - 289 - Approach EB WB SB HCM Control Delay, s 8.2 0 15.8 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1602 - - - 1063 HCM Lane V/C Ratio 0.365 - - - 0.698 HCM Control Delay (s) 8.5 - - - 15.8 HCM Lane LOS A - - - C HCM 95th %tile Q(veh) 1.7 - - - 6 HCM 6th TWSC PM 2028 Build w Mitigation 10: SC 6 & Innovation Pl 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Int Delay, s/veh 5.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 117 261 979 146 31 1017 Future Vol, veh/h 117 261 979 146 31 1017 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 100 - 100 25 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 130 290 1088 162 34 1130 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1721 544 0 0 1250 0 Stage 1 1088 - - - - - Stage 2 633 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver ~ 80 483 - - 553 - Stage 1 284 - - - - - Stage 2 491 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 75 483 - - 553 - Mov Cap-2 Maneuver 192 - - - - - Stage 1 284 - - - - - Stage 2 461 - - - - - Approach WB NB SB HCM Control Delay, s 33.2 0 0.4 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - - 192 483 553 - HCM Lane V/C Ratio - - 0.677 0.6 0.062 - HCM Control Delay (s) - - 55.9 23 11.9 - HCM Lane LOS - - F C B - HCM 95th %tile Q(veh) - - 4.1 3.9 0.2 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th Roundabout PM 2028 Build w Mitigation 11: School Access & Innov.Pl Connector 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Intersection Delay, s/veh 5.6 Intersection LOS A Approach EB NB SB Entry Lanes 1 1 1 Conflicting Circle Lanes 1 1 1 Adj Approach Flow, veh/h 63 385 491 Demand Flow Rate, veh/h 64 392 501 Vehicles Circulating, veh/h 345 10 14 Vehicles Exiting, veh/h 170 399 388 Ped Vol Crossing Leg, #/h 0 0 0 Ped Cap Adj 1.000 1.000 1.000 Approach Delay, s/veh 4.4 5.2 6.1 Approach LOS A A A Lane Left Left Left Designated Moves LR LT TR Assumed Moves LR LT TR RT Channelized Lane Util 1.000 1.000 1.000 Follow-Up Headway, s 2.609 2.609 2.609 Critical Headway, s 4.976 4.976 4.976 Entry Flow, veh/h 64 392 501 Cap Entry Lane, veh/h 971 1366 1360 Entry HV Adj Factor 0.984 0.981 0.981 Flow Entry, veh/h 63 385 491 Cap Entry, veh/h 955 1340 1334 V/C Ratio 0.066 0.287 0.368 Control Delay, s/veh 4.4 5.2 6.1 LOS A A A 95th %tile Queue, veh 0 1 2 HCM 6th TWSC PM 2028 Build w Mitigation 12: Innovation Pl & Innov.Pl Connector & Internal School Access 04/21/2026 213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report Intersection Int Delay, s/veh 9.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 168 9 0 0 192 53 0 0 0 83 2 186 Future Vol, veh/h 168 9 0 0 192 53 0 0 0 83 2 186 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 187 10 0 0 213 59 0 0 0 92 2 207 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 272 0 0 10 0 0 731 656 10 627 627 243 Stage 1 - - - - - - 384 384 - 243 243 - Stage 2 - - - - - - 347 272 - 384 384 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1291 - - 1610 - - 337 385 1071 396 400 796 Stage 1 - - - - - - 639 611 - 761 705 - Stage 2 - - - - - - 669 685 - 639 611 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1291 - - 1610 - - 220 329 1071 352 342 796 Mov Cap-2 Maneuver - - - - - - 220 329 - 352 342 - Stage 1 - - - - - - 546 522 - 650 705 - Stage 2 - - - - - - 494 685 - 546 522 - Approach EB WB NB SB HCM Control Delay, s 7.8 0 0 18.2 HCM LOS A C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) - 1291 - - 1610 - - 570 HCM Lane V/C Ratio - 0.145 - - - - - 0.528 HCM Control Delay (s) 0 8.3 0 - 0 - - 18.2 HCM Lane LOS A A A - A - - C HCM 95th %tile Q(veh) - 0.5 - - 0 - - 3.1 Appendix D Turn Lane Graphs Bruner at S-626 AM Ex Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection. 2-lane roadway (English) INPUT Value 30 25% 405 610 OUTPUT Value 231 CALIBRATION CONSTANTS Value 3.0 5.0 1.9 Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A), %: Advancing volume (V A), veh/h: Opposing volume (V O), veh/h: Variable Average time for left-turn vehicle to clear the advancing lane, s: Limiting advancing volume (V A), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment warranted. Variable Average time for making left-turn, s: Critical headway, s: 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 Opposing Volume (V O), veh/h Advancing Volume (V A), veh/h Left-turn treatment warranted. Left-turn treatment not Bruner at S-626 AM Bkgnd Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection. 2-lane roadway (English) INPUT Value 30 5% 430 628 OUTPUT Value 463 CALIBRATION CONSTANTS Value 3.0 5.0 1.9 Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A), %: Advancing volume (V A), veh/h: Opposing volume (V O), veh/h: Variable Average time for left-turn vehicle to clear the advancing lane, s: Limiting advancing volume (V A), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment NOT warranted. Variable Average time for making left-turn, s: Critical headway, s: 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 Opposing Volume (V O), veh/h Advancing Volume (V A), veh/h Left-turn treatment warranted. Left-turn treatment not Bruner at S-626 AM Build Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection. 2-lane roadway (English) INPUT Value 30 4% 639 1065 OUTPUT Value 316 CALIBRATION CONSTANTS Value 3.0 5.0 1.9 Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A), %: Advancing volume (V A), veh/h: Opposing volume (V O), veh/h: Variable Average time for left-turn vehicle to clear the advancing lane, s: Limiting advancing volume (V A), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment warranted. Variable Average time for making left-turn, s: Critical headway, s: 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 Opposing Volume (V O), veh/h Advancing Volume (V A), veh/h Left-turn treatment warranted. Left-turn treatment not Bruner at S-626 PM Ex Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection. 2-lane roadway (English) INPUT Value 30 17% 363 328 OUTPUT Value 352 CALIBRATION CONSTANTS Value 3.0 5.0 1.9 Average time for left-turn vehicle to clear the advancing lane, s: Limiting advancing volume (V A), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment warranted. Variable Average time for making left-turn, s: Critical headway, s: Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A), %: Advancing volume (V A), veh/h: Opposing volume (V O), veh/h: Variable 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 Opposing Volume (V O), veh/h Advancing Volume (V A), veh/h Left-turn treatment warranted. Left-turn treatment not Bruner at S-626 PM Bkgnd Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection. 2-lane roadway (English) INPUT Value 30 5% 430 338 OUTPUT Value 626 CALIBRATION CONSTANTS Value 3.0 5.0 1.9 Average time for left-turn vehicle to clear the advancing lane, s: Limiting advancing volume (V A), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment NOT warranted. Variable Average time for making left-turn, s: Critical headway, s: Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A), %: Advancing volume (V A), veh/h: Opposing volume (V O), veh/h: Variable 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 Opposing Volume (V O), veh/h Advancing Volume (V A), veh/h Left-turn treatment warranted. Left-turn treatment not Bruner at S-626 PM Build Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection. 2-lane roadway (English) INPUT Value 30 4% 689 534 OUTPUT Value 544 CALIBRATION CONSTANTS Value 3.0 5.0 1.9 Average time for left-turn vehicle to clear the advancing lane, s: Limiting advancing volume (V A), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment warranted. Variable Average time for making left-turn, s: Critical headway, s: Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A), %: Advancing volume (V A), veh/h: Opposing volume (V O), veh/h: Variable 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 Opposing Volume (V O), veh/h Advancing Volume (V A), veh/h Left-turn treatment warranted. Left-turn treatment not Bruner at Sch Acc AM Build Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection. 2-lane roadway (English) INPUT Value 30 98% 1045 19 OUTPUT Value 1389 CALIBRATION CONSTANTS Value 3.0 5.0 1.9 Average time for left-turn vehicle to clear the advancing lane, s: Limiting advancing volume (V A), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment NOT warranted. Variable Average time for making left-turn, s: Critical headway, s: Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A), %: Advancing volume (V A), veh/h: Opposing volume (V O), veh/h: Variable 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 Opposing Volume (V O), veh/h Advancing Volume (V A), veh/h Left-turn treatment warranted. Left-turn treatment not Bruner at Sch Acc PM Build Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection. 2-lane roadway (English) INPUT Value 30 96% 546 14 OUTPUT Value 1019 CALIBRATION CONSTANTS Value 3.0 5.0 1.9 Average time for left-turn vehicle to clear the advancing lane, s: Limiting advancing volume (V A), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment NOT warranted. Variable Average time for making left-turn, s: Critical headway, s: Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A), %: Advancing volume (V A), veh/h: Opposing volume (V O), veh/h: Variable 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 Opposing Volume (V O), veh/h Advancing Volume (V A), veh/h Left-turn treatment warranted. Left-turn treatment not /0 /1 /2 /3 /4 □ /6 /7 /8 /9 □ /10 /11 /12 /13 /14 /15 /13 /16 /12 /10 /17 /11 /15 □ /18 /19 /20 /21 /22□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ /24 /25 /26 /27 /28 □ /29 /30 /31 /32 /33 /27 □ /30 /34 □ /25 /35 /36 /37 □ /38 /39 /39 /36 /30 /40 /38 /41 /36 /27 □ /25 /35 □ /42 /30 /31 /42 /43 /38 /37 /34 □ /43 /30 /26 /42 □ /38 □/44 /27 /34 /30 /31 /35 □ /34 /39 /27 /27 /44 □ /25 /45 □ /46 /47 □ /48 /30 /36 /27 /34 □ /39 /27 /33 □ /42 /25 /32 /33 □ /25 /33 □ /31 /33 /27 /38 /26 /27 /33 /49 □ □ □ □ □ □ □ □ □ □ □ □ □ □ /50 /51 /52 /53 /54 /55 /52 /56 /54 /57 □ /59 /60 /61 □ /61 /52 /50 /62 /63 /64 /63 /51 /61 /56 □ /55 /65 /56 /54 /57 □ /65 /63 □ /51 /56 /57 /52 /50 /56 /65 /55 /52 /66 /54 /53 □ /52 /56 /63/54 /61 /57 /54 /67 /63 /52 /60 /56 /57 □ /60 /56 □ /59 /60 /51 /61 /64 /55 /65 /56 /54 □ /62 /52 /50 /62 /68/65 /69 /57 □ /59 /70 /71 /72 /73 /74 □ /75 /76 /77 /64 /78 □ NEW BUSINESS # 3 TO: Planning Commission FROM: Jessica Lybrand, Director of Planning and Building SUBJECT: Amendment to Approved Traffic Mitigation Plan at Preserves at Cherokee Trail DATE: May 20, 2026 BACKGROUND: The Preserves at Cherokee Trail subdivision, consisting of 62 residential lots, received approval in August 2024. As part of the approved plans, token right -turn lanes were proposed at each of the development access points along Cherokee Trail as traffic mitigation measures associated with the project. Subsequent to approval, the South Carolina Department of Transportation (SCDOT) reviewed the proposed improvements and denied the installation of the token right-turn lanes. SCDOT requested that alternative traffic mitigation measures be considered. Following discussions between the applicant and Town Staff, it was determined that the installation of a northbound right-turn lane at the intersection of Old Cherokee Road and Cherokee Trail would satisfy the project’s traffic mitigation requirements. ACTION REQUESTED: Approval of the Alternate Traffic Mitigation GRADING & STORMDRAINAGE PLAN C8 REVISIONSDESCRIPTIONDATE PROJECT #SHEET LEXINGTON, SC   LEXINGTON COUNTYCOMMENTS08/15/251 TOWN COMMENTS02/19/262 PROJ NO: 24015 3 DAYS BEFORE DIGGING IN SOUTH CAROLINA Palmetto Utility Protection Service CALL 811 "SUPERIOR COMPREHENSIVEENGINEERING SOLUTIONS"WWW.4DENGR.COMCIVIL ENGINEERING PRESERVES AT CHEROKEE TRAILSCALE: 1"=60' OCTOBER 10, 2024 08/15/2025

Source: Town of Lexington website. First collected Oct 13, 2026.