Planning Commission Meeting - May 20, 2026
Town of Lexington · Lexington County · meeting of May 20, 2026 · Agendas
Open the original document More from Town of Lexington
This document is no longer listed on Town of Lexington's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
REGULAR PLANNING COMMISSION MEETING
Council Chambers
111 Maiden Lane, Lexington, SC
May 20, 2026
If you wish to speak at the meeting, please be sure to sign up in advance.
AGENDA
7:30AM BREAKFAST – ELI MACK
8:00AM OPENING STATEMENT
INVOCATION
PLEDGE OF ALLEGIANCE
CALL TO ORDER
DELETIONS ON AGENDA
APPROVAL OF MINUTES
1. Regular Planning Commission Meeting April 22, 2026
NEW BUSINESS ITEMS
1. A nnexation of Lexington County Tax Map# 005496- 01-031 Located at 186 Zenker
Road
2. A
merican Leadership Academy Gym & Sports Complex Expansion Located at 105 &
109 Innovation Place
3. Amendment to Approved Traffic Mitigation Plan at Preserves at Cherokee Trail
ADJOURNMENT
MINUTES
TOWN OF LEXINGTON
REGULAR PLANNING COMMISSION MEETING
April 22, 2026
The Planning Commission met on April 22, 202 6, at 8:00 a.m. in the Council Chambers at Town
Hall, 111 Maiden Lane, Lexington, South Carolina . The meeting was attended by Chairman Frank
Berry, Vice Chair man Jarrett Harrelson , Commissioners Jamie Fite, Roscoe Caughman, JT
Stephenson, Joe Robertston, and Betsy McCall . Commissioners Sammy Hendrix and Brian Amick
were absent. A quorum was met.
Others in attendance wer e Councilmember Todd Lyle, Planning and Building Director J essica
Lybrand, Transportation Director Randy Edwards, Transportation Department Coordinator Rondie
Cheathem, Special Funds Manager Vanessa Stoquert, Digital Media Coordinator Michael Tolbert ,
and Municipal Clerk Laura Hinson.
There were no (0) citizens present, and none from the news media.
CALL TO ORDER, INVOCATION & PLEDGE: Chairman Berry called the meeting to order and
welcomed those in attendance, noting the meeting was available for public viewing on the Town of
Lexington YouTube channel. He reminded speakers to sign up for agenda items before the meeting
and to indicate their residency status. Planning Commission members introduced themselves, Chair
Berry offered the invocation, and all joined in the Pledge of Allegiance.
DELETIONS TO AGENDA: None
APPROVAL OF MINUTES:
Vice Chair Harrelson made a motion to approve the minutes as submitted for the March 17, 2026,
Planning work session and the regular Planning Commission meeting on March 18, 2026.
Commissioner Fite seconded the approval. The motion carried unanimously. 7 in favor/ 0 opposed/
2 absent
NEW BUSINESS ITEMS:
1. Development Impact Fee Update-Phase 2- Ms. Lybrand summarized the requirements of
the Impact Fee Ordinance, adopted February 1, 2020, noting it requires a five -year
comprehensive review of the Impact Fee Study, Capital Improvements Plan, Housing
Affordability Analysis, and Ordinance. She stated that Phase One was adopted by the Council
on March 3, 2025, and the transportation component was deferred pending completion of
Local Transportation Improvement Plan ( LTIP) 2.0, which is now complete. Phase Two,
including transportation, is now before the Commission.
Mr. Matt Noonkester, Owner and Founding Principal of City Explained, Inc., presented the
proposed update to the Town’s Development Impact Fee Program. He noted that his firm
prepared the previous impact fee studies and that this update is primarily driven by the
completion of the Transportation Study (Version 2.0).
MINUTES
REGULAR TOWN PLANNING COMMISSION
April 22, 2026
2
He explained that while state law requires review and update of the program every five years,
this update is needed to incorporate the completed transportation analysis. Upon adoption, the
five-year review cycle will reset all impact fee categories. Although the focus is
transportation, all three categories, Parks and Recreation, Municipal Facilities and Services,
and Transportation, are being brought forward to align schedules. No fee changes are
proposed for Parks or Municipal Facilities; only minor text edits were made. The
transportation analysis supports an increase due to identified improvements and rising
construction costs, and inflation was factored into those calculations.
Mr. Noonkester reviewed the four required documents included in the Commission’s packet:
a. Impact Fee Justification Report , including technical appendix (existing
conditions, growth projections, and cost calculations).
b. Capital Improvements Plan (CIP) identifying eligible projects.
c. Housing Affordability Analysis, as required by state law.
d. Updated Impact Fee Ordinance, with proposed text amendments highlighted.
He explained that impact fees may only be used to expand capacity to serve new growth and
cannot fund operations, maintenance, or replacement. Transportation uses an improvement -
driven methodology tied to adopted level-of-service standards, with projects identified when
thresholds are exceeded.
He noted the Town currently applies a 0% discount rate (charging the maximum justifiable
fee), which is a policy decision of Council. Sample discount scenarios are included in the
report.
Mr. Noonkester also highlighted improvements to the CIP format, including individual project
sheets for clearer tracking and budgeting. He summarized that while housing costs continue
to rise, the impact fee increase represents a relatively small portion of total housing cost, and
state law requires only that the analysis be provided.
He concluded by stating the proposed amendments primarily update references, unit costs,
and effective dates. Following the Planning Commission recommendation, the item will
proceed to Council for consideration (full presentation and draft text changes are attached).
Chair Berry asked how they go about educating the public, as when people hear impact fees,
they sometimes think negatively. He noted that this money is used to make improvements to
traffic, which is a main concern for many people.
Mr. Noonkester clarified that impact fees apply only to new development and are intended to
offset the additional demand new growth places on Town services and infrastructure. He noted
that impact fees help reduce the need for broader tax increases by ensu ring that new
development contributes toward the cost of expanded capacity. He explained that impact fees
are triggered by the issuance of a building permit for new construction. Existing home sales
do not generate impact fees because no new permits are issued. However, if an existing
resident builds a new home within the community, the new construction is considered an
added impact and would be subject to the fee, as another household would ultimately occupy
the previously existing home.
MINUTES
REGULAR TOWN PLANNING COMMISSION
April 22, 2026
3
Vice Chair Harrelson noted for the record that this was reviewed thoroughly a year ago and
just delayed the transportation portion until the new LTIP 2.0 was updated, and he just wanted
to note that for the public.
Ms. Lybrand noted it was in December 2024, and all those planning sessions and meetings
were online. Mr. Noonkester confirmed that many of the proposed revisions are housekeeping
updates to ensure all chapters are current and consistent.
Chair Berry confirmed the approval process, noting that the Planning Commission would
make a recommendation at this meeting, followed by Town Council consideration in May,
which would include two readings and a public hearing. He added that adoption could
occur in June, unless the Council elects to delay action.
Commissioner Robertson added that, in response to prior comments regarding public
education, many of the projects identified in the report align with locations residents
commonly cite as traffic concerns. He noted that the listed improvements were identified
through traffic analysis and emphasized that, in many cases, there may not be an
alternative funding source available for these projects outside of the impact fee.
Mr. Noonkester stated that upon receiving the LTIP 2.0 packet, he noted it was
approximately 1,000 pages and contained thorough research.
Chair Berry asked for confirmation that the project list was prioritized beginning with the
locations most in need of improvement and then working downward.
Mr. Edwards confirmed that the projects were identified and prioritized, starting with the
worst-performing locations based on the analysis.
Chair Harrelson made a motion to recommend approval of the development impact fee
phase 2. The motion was seconded by Commissioner Fite. The motion carried
unanimously, 7 in favor/0 opposed/ 2 absent. There were no other questions or comments.
ADJOURNMENT:
Chairman Berry noted without objection that the meeting adjourned at 8:25 am
Respectfully Submitted,
__________________________
Laura Hinson
Municipal Clerk
APPROVED:
______________________
Chairman Frank Berry
FOIA COMPLIANCE – Public notification of this meeting was published, posted, and mailed in compliance with the Freedom of Information Act and
the Town of Lexington requirement.
NEW BUSINESS #1
TO: Planning Commission
FROM: Jessica Lybrand, Director of Planning and Building
SUBJECT: Annexation of Lexington County Tax Map##005496-01-031 Located at 186 Zenker Rd
DATE: May 20, 2026
____________________________________________________________________________________
BACKGROUND: Allen H. Gates, Joey H. Gates, Norma J. Taylor, Marty R. Gates, Gary W.
Gates, and Bruce M. Gates own approximately 72 acres on Zenker Road and has petitioned to annex
the property. Properties in Town near this one are zoned Industrial and Protected Residential. Zenker
Road is classified as a Local Road.
The property is shown on the Future Land Use Map as an Employment/ Light Industrial Area. The
Comprehensive Land Use Plan describes this area as a node intended to accommodate a mix of
industrial, office, maker-space, flex-tenant, and storage uses designed to support employment-generating
development. These areas are characterized by business activity occurring primarily within buildings,
while allowing for limited outdoor storage and loading/manufacturing activities.
The applicant is requesting the property be zoned with Protected Residential zoning and Zenker Road
should be classified as a Local Road.
____________________________________________________________________________________
ACTION REQUESTED: Recommendation on Annexation and Zoning Classification
____________________________________________________________________________________
L e x in g t o n C o u n t y M a p # 0 0 5 4 9 6 - 0 1 - 0 3 1
R o a d s
A r t e r ia l
C o lle c t o r
L o c a l
P a r c e ls
C o u n t y B o u n d a r ie s
M u n ic ip a lit ie s
T o w n o f L e x in g t o n
U n in c o r p o r a t e d
5 / 1 3 / 2 0 2 6 , 1 : 3 1 : 1 7 P M
0 0 . 1 0 . 20 . 0 5 m i
0 0 . 2 0 . 40 . 1 k m
1 : 8 , 0 0 0
P r in t e d f r o m L e x in g t o n C o u n t y O n e M a p . L e x in g t o n C o u n t y m a k e s n o w a r r a n t y , r e p r e s e n t a t io n o r g u a r a n t y . . . V ie w t h e f u ll d a t a d is c la im e r a t h t t p s : / / le x - c o . s c . g o v / d e p a r t m e n t s / p la n n in g - g is / g is -
NEW BUSINESS #2
TO: Planning Commission
FROM: Jessica Lybrand, Director of Planning and Building
SUBJECT: American Leadership Academy Gym & Sports Complex Expansion Located at 105 &
109 Innovation Place
DATE: May 20, 2026
____________________________________________________________________________________
BACKGROUND: American Leadership Academy is proposing a Gymnasium, Classroom, & Sports Complex
Expansion at 105 & 109 Innovation Place. The expansion would include the addition of an approximately 34,227
square-foot building containing a full -size gymnasium and additional classrooms, a full stadium field with track
and bleachers, and the addition of approximately 10,700 linear feet of on-site stacking. The proposed expansion is
anticipated to increase the school’s capacity from approximately 1,700 students to 2,600 students. As presented, the
project meets all zoning requirements. The project will also appear before the Board of Architectural and
Appearance to ensure compliance with applicable architectural and appearance standards.
The Traffic Impact Analysis prepared for the proposed American Leadership Academy expansion evaluated
existing and projected traffic conditions in the area surrounding the school. Based on the study, the following
improvements were recommended:
• Geometric modifications at the intersection of Glassmaster Road and Bruner Road to accommodate left-turn
movements.
• Geometric modifications at the intersection of Glassmaster Road and Bruner Road to improve right-turn
movements.
• Minor geometric alignment modifications at the intersection of Industrial Drive and South Lake Drive (SC 6) to
allow concurrent operation of the existing traffic signal.
• Construction of a northbound right-turn lane on South Lake Drive (SC 6) at Innovation Place into the school
campus.
All improvements are subject to SCDOT review, approval, and standards.
Consideration will also be given to dualization of the interior roundabout between the upper school exit and
Innovation Place.
The Planning Commission should consider the proposed expansion and associated transportation and circulation
improvements, including the relocation of vehicle stacking from public roadways to the interior of the site, in its
evaluation of this request.
____________________________________________________________________________________
ACTION REQUESTED: Site Plan Approval
____________________________________________________________________________________
LOWER
SCHOOL
UPPER
SCHOOL
PROPOSED
GYM/
CLASSROOM
SOUTH LAKE DRIVE
INNOVATION PLACE
BRUNER ROAD
PROPOSED
STADIUM
NC FIRM#: C-4911, C-670
v3co.com
landscape architecture | planning | civil engineering | surveying
ALA LEXINGTON
LEXINGTON, SC | DATE: 05.12.2026 | PROJECT NO.: 251016 V3 Companies
LEXINGTON CHARTER SCHOOL
LEXINGTON, SC | DATE: 05.12.2026 | PROJECT NO.: 251016
RENDERED SITE PLAN
N
PARKING TABLE
CLASSROOMS:
TOTAL REQUIRED = 379 SPACES
STADIUM:
TOTAL REQUIRED = 344 SPACES
TOTAL PROVIDED = 404 SPACES
o o o
o o
o
o
o
oooooo
o
o
o o
o
o o
o
o
o
o
ooooo
o
o
o
o o
o
o
o o
xx
xx
x x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x
x
x
x x
x x
4'-3" 4'-3"
4'-3" 4'-3"
SOUTH LAKE DRIVE90' PUBLIC R/WPER PB 11343, PG 0347
BRUNER RD66' PUBLIC R/WPER PB 10071, PG 0339
INNOVATION PLVARIABLE WIDTH R/WPER MONUMENTATION
DETENTION POND
DETENTION POND
SOUTH LAKE DRIVE90' PUBLIC R/WPER PB 11343, PG 0347
ZONE B STACKING 3095'
ZONE A STACKING 7660'
BRUNER ROAD ENTRANCE
VISITOR/STAFF PARKING
STAFF/STUDENT PARKING
INNOVATION EAST ENTRANCE
INNOVATION NORTH ENTRANCE
CONES PLACED TO BLOCK DRIVERSFROM BYPASSING THE QUEUE
CROSSWALKCONTROLLEDBY STAFF
ZONE BSINGLE LANE7-BAY LOADING
ZONE ASINGLE LANE 7-BAY LOADING
STAFF TO ENSURE ZONE AEXIT LANE REMAINS CLEAR
LOWERSCHOOLBUILDINGUPPERSCHOOLBUILDING
GYMNASIUM/CLASSROOMBUILDING
BUS LOADING
TRAFFICMANAGEMENT PLANEARLY BELL ALA LEXINGTON
N:\2025\251016\Drawings\Exhibit Drawings\251016-EXHIBIT-STACKING.dwg, 5/8/2026 12:17:01 PM, jamie sherer, Sheet Size 11x17, V3 Companies
V3 COMPANIES
656 South Main StreetSuite 320Greenville, SC 29601www.v3co.com
CLIENT:
LEXINGTON, SC1" = 200'
0 100 200200
N
DATE:05.08.2026
AM OPERATIONS:·There is a 45-minute staggered bell schedule between lower school (K-5) and upperschool (6-12).··Early bell schedule starts at 7:40 AM··Late bell schedule starts at 8:25 AM·Both designated drop-off/pick-up zones are used for both bell schedules to assurethere is enough stacking on site.
PM OPERATIONS:·There is a 45-minute staggered bell schedule for the afternoon operations betweenlower school (K-5) and upper school (6-12).··Early bell schedule starts at 2:40··Late bell schedule starts at 3:25.·Both designated drop-off/pick-up zones are used for both bell schedules to assurethere is enough stacking on site.
DROP-OFF ZONE PROCEDURES:·There are two designated drop-off/pick-up zones.··Zone A drop off is at the lower school (K-5) building.··Zone B drop off is at the upper school (6-12) building.·Cars enter the drop-off/pick-up Zones A & B.·All students exit/enter cars on the right side of the vehicles adjacent to the school andnext to the curb. These platoons are in groups of 7 cars.·Staff members monitor these operations at Zone A, Zone B, and crosswalks to assuresafety. No loading or unloading is allowed until all cars come to a complete stop indesignated drop-off/pick-up zones.EARLY BELL ZONE A
EARLY BELL ZONE B
LATE BELL ZONE A
LATE BELL ZONE B
OPERATIONAL NOTES
BUS LOOP
o o o
o o
o
o
o
oooooo
o
o
o o
o
o o
o
o
o
o
ooooo
o
o
o
o o
o
o
o o
xx
xx
x x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x
x
x
x x
x x
4'-3" 4'-3"
4'-3" 4'-3"
BUILDING
BUILDING
SOUTH LAKE DRIVE90' PUBLIC R/WPER PB 11343, PG 0347
BRUNER RD66' PUBLIC R/WPER PB 10071, PG 0339
INNOVATION PLVARIABLE WIDTH R/WPER MONUMENTATION
DETENTION POND
DETENTION POND
SOUTH LAKE DRIVE90' PUBLIC R/WPER PB 11343, PG 0347
ZONE B STACKING 3095'
ZONE A STACKING 7660'
BRUNER ROAD ENTRANCE
VISITOR/STAFF PARKING
STAFF/STUDENT PARKING
INNOVATION EAST ENTRANCE
INNOVATION NORTH ENTRANCE
CONES PLACED TO BLOCK DRIVERSFROM BYPASSING THE QUEUE
CROSSWALKCONTROLLEDBY STAFF
ZONE BSINGLE LANE7-BAY LOADING
ZONE ASINGLE LANE 7-BAY LOADING
STAFF TO ENSURE ZONE AEXIT LANE REMAINS CLEAR
LOWERSCHOOLBUILDINGUPPERSCHOOLBUILDING
GYMNASIUM/CLASSROOMBUILDING
BUS LOADING
TRAFFICMANAGEMENT PLANLATE BELL ALA LEXINGTON
N:\2025\251016\Drawings\Exhibit Drawings\251016-EXHIBIT-STACKING.dwg, 5/8/2026 12:17:03 PM, jamie sherer, Sheet Size 11x17, V3 Companies
V3 COMPANIES
656 South Main StreetSuite 320Greenville, SC 29601www.v3co.com
CLIENT:
LEXINGTON, SC1" = 200'
0 100 200200
N
DATE:05.08.2026
AM OPERATIONS:·There is a 45-minute staggered bell schedule between lower school (K-5) and upperschool (6-12).··Early bell schedule starts at 7:40 AM··Late bell schedule starts at 8:25 AM·Both designated drop-off/pick-up zones are used for both bell schedules to assurethere is enough stacking on site.
PM OPERATIONS:·There is a 45-minute staggered bell schedule for the afternoon operations betweenlower school (K-5) and upper school (6-12).··Early bell schedule starts at 2:40··Late bell schedule starts at 3:25.·Both designated drop-off/pick-up zones are used for both bell schedules to assurethere is enough stacking on site.
DROP-OFF ZONE PROCEDURES:·There are two designated drop-off/pick-up zones.··Zone A drop off is at the lower school (K-5) building.··Zone B drop off is at the upper school (6-12) building.·Cars enter the drop-off/pick-up Zones A & B.·All students exit/enter cars on the right side of the vehicles adjacent to the school andnext to the curb. These platoons are in groups of 7 cars.·Staff members monitor these operations at Zone A, Zone B, and crosswalks to assuresafety. No loading or unloading is allowed until all cars come to a complete stop indesignated drop-off/pick-up zones.EARLY BELL ZONE A
EARLY BELL ZONE B
LATE BELL ZONE A
LATE BELL ZONE B
OPERATIONAL NOTES
BUS LOOP
Prepared for Way Construction
Traffic Impact Analysis
American Leadership Academy
Charter School
Lexington, South Carolina
Prepared By:
Craig D. Nelson, PE | Traffic Engineer
craig.nelson@ice-eng.com
5/5/2026
Traffic Impact Analysis ALA Charter School Lexingt on
1
Contents
EXECUTIVE SUMMARY .................................................................................................................................... 2
INTRODUCTION ............................................................................................................................................... 3
EXISTING CONDITIONS .................................................................................................................................... 3
FIGURE 1- SITE LOCATION AND STUDY AREA ...................................................................................................... 5
FIGURE 2 – PROPOSED SITE PLAN .................................................................................................................... 6
TRANSPORTATION SYSTEM ANALYSIS ............................................................................................................ 7
DATA COLLECTION .......................................................................................................................................... 7
TRAFFIC CONDITIONS ...................................................................................................................................... 7
FIGURE 3 -- 2026 EXISTING PEAK HOUR TRAFFIC VOLUMES ................................................................................. 8
FIGURE 4 -- 2028 BACKGROUND PEAK HOUR TRAFFIC VOLUMES .......................................................................... 9
PROPOSED DEVELOPMENT ............................................................................................................................ 10
TRIP GENERATION ....................................................................................................................................... 10
SITE TRIPS .................................................................................................................................................. 10
FIGURE 5 – SITE TRIPS PERCENT DISTRIBUTION ................................................................................................. 11
FIGURE 6 – SITE TRIPS ................................................................................................................................. 12
FIGURE 7 – 2028 BUILD CONDITIONS – PEAK HOUR TRAFFIC VOLUMES ............................................................... 13
TRAFFIC ANALYSIS......................................................................................................................................... 14
TURN LANE ANALYSIS ................................................................................................................................... 16
FINDINGS AND CONCLUSIONS ...................................................................................................................... 16
RECOMMENDATIONS.................................................................................................................................... 17
APPENDICES .................................................................................................................................................. 18
Traffic Impact Analysis ALA Charter School Lexingt on
2
Executive Summary
A Traffic Impact Analysis (TIA) was performed for a proposed addition to the American
Leadership Academy Charter School on the east side of SC 6 (S Lake Road) north of its
intersection with Industrial Drive/Glassmaster Road (S-626) in Lexington, South Carolina.
Proposed land use for the site includes a Charter S chool (K-12) with a capacity of 2600
Students; existing student population was assumed t o be 1674 based on actual attendance
when traffic counts were obtained for the study, resulting in 926 additional students.
Traffic to and from the site will use the existing access on SC 6 (S Lake Road) via Innovation
Place approximately 700 feet north of Industrial Dr ive/Glassmaster Road (S-626), and the
existing School Access on Bruner Road approximately 300 feet east of Glassmaster Road (S-
626).
Study intersections included SC 6 (S Lake Road) at Industrial Drive/Glassmaster Road (S-626),
Glassmaster Road (S-626)/Bruner Road at Glassmaster Road (S-626), Bruner Road at School
Access, and SC 6 (S Lake Road) at Innovation Place.
Growth projections were made using the SCDOT AADT w ebsite, and a 1.48% annual
background traffic growth rate was assumed for the Build year (2028).
It was found that in the 2028 Build scenario, the d elays and levels of service (LOS) for the
southbound School Access approach to Bruner Road wo uld remain favorable for the
proposed expansion during the AM and PM drop-off/pick-up peak hours.
For the remaining study intersections, due to the i ncreased school traffic, increases in delay
were noted based on capacity analysis. The interse ctions were also evaluated to determine
if turn lanes are recommended based on SCDOT guidelines. The recommendations include:
• Coordinate with the Town of Lexington for the possi ble widening of Bruner Road
between Glassmaster Road (S-626) and the School Acc ess to accommodate an
exclusive left turn lane into Glassmaster Road (S-6 26) which would include a full 3-
lane pavement width between the intersections.
• Consider the feasibility of widening Industrial Drive (S-626) at SC 6 (S Lake Rd) adjacent
to the Whataburger property to accommodate an addit ional lane on Industrial Drive
(S-626), allowing for separate left-, through-, and right-turn lanes on the eastbound
approach. The additional lane would enable a chang e in the operation of the traffic
signal from the current split phase operation to co ncurrent side street through
movements, improving efficiency.
• Consider the construction of a northbound right tur n lane on SC 6 (S Lake Road) at
Innovation Place to accommodate school traffic.
• Continue to prohibit left-turns out of the School Access as well as right-turns into the
School Access at Bruner Road during drop-off/pick-up peak hours.
The study concludes that the public roadway system serving the site can accommodate the
anticipated traffic volumes generated by the propos ed development with consideration of
the mitigation measures analyzed.
Traffic Impact Analysis ALA Charter School Lexingt on
3
Introduction
This report summarizes the results of a traffic stu dy conducted by Infrastructure Consulting
& Engineering, LLC (ICE) in connection with a propo sed addition to the American Leadership
Academy Charter School on the east side of SC 6 (S Lake Road) north of its intersection with
Industrial Drive/Glassmaster Road (S-626) in Lexing ton, South Carolina. Proposed land use
for the site includes a Charter School (K-12) with a capacity of 2600 Students; existing student
population was assumed to be 1674 based on actual a ttendance when traffic counts were
obtained for the study.
The proposed expansion is anticipated to be complet e in 2027, with a horizon year for the
Build analysis of 2028 (completion year plus one).
The Site Location and Study Area are illustrated in Figure 1, and the Site Plan is presented in
Figure 2.
The purpose of this study is to determine the traff ic impacts of the proposed expansion on
the adjacent roadway system and the study intersections in the vicinity of the project site .
Existing Conditions
The land use near the study area is a mix of indust rial, commercial, retail, residential, and
school. The school expansion will take place on the existing school site.
Regional access to the project site is provided by I-20 and SC 6 (S Lake Road), and direct access
to the site is proposed to be provided by the exist ing accesses via SC 6 (S Lake Road) at
Innovation Place, and via the School Access at Brun er Road. I-20 is an east-west interstate
highway in the southern United States connecting Re eves County, Texas to I-95 in Florence,
South Carolina. SC 6 is a generally northwest-sout heast highway running from US 76 in
Ballentine to US 52 in Moncks Corner. Bruner Road i s a short east-west town-maintained
road, intersecting with Glassmaster Road (S-626) ap proximately 300 feet west of the School
Access, and dead-ending about 2500 feet to the east.
SC 6 (S Lake Road) is a five-lane highway with a po sted speed limit of 45 mph (See Table 1).
Industrial Drive (S-626) is a two-lane roadway with a posted speed limit of 45 mph.
Glassmaster Road (S-626) is a two-lane roadway with an assumed speed limit of 30 mph.
Bruner Road is a two-lane roadway with an assumed s peed limit of 30 mph. The proposed
project site spans approximately 890 feet along SC 6 (S Lake Rd) and 160 feet along Bruner
Road.
Study intersections included SC 6 (S Lake Road) at Industrial Drive/Glassmaster Road (S-626),
Glassmaster Road (S-626)/Bruner Road at Glassmaster Road (S-626), Bruner Road at School
Access, and SC 6 (S Lake Road) at Innovation Place.
Traffic Impact Analysis ALA Charter School Lexingt on
4
The roadway classification is summarized in Table 1 below:
Table 1
Roadway Classifications
American Leadership Academy Charter School, Lexington SC TIA
Roadway Classification Speed Limit
SC 6 (S Lake Rd) Urban-Minor Arterial 45 mph
Industrial Drive (S-626) Urban-Major Collector 45 mph
Glassmaster Road (S-626) Urban-Local 30 mph (assumed)
Bruner Road Urban-Local 30 mph (assumed)
Traffic Impact Analysis ALA Charter School Lexingt on
7
Transportation System Analysis
Street System Improvements: As per the SCDOT Project Viewer, no projects are pl anned in
the immediate area.
Pedestrian Access: It was observed that there are existing sidewalks, crosswalks, and
pedestrian signals at the intersection of SC 6 (S L ake Road) at Industrial Drive/Glassmaster
Road (S-626). There is a sidewalk on each side of SC 6 (S Lake Road) south of Innovation Place,
and a sidewalk on the west side of SC 6 (S Lake Roa d) north of Innovation Place. A sidewalk
is in place on the south side of Innovation Place. There are no existing sidewalks at the
remaining study intersections.
Bicycle Access: Currently, there are no bikeways in the vicinity of the project site. Based upon
review and research there are no plans for future bikeways in this area.
Transit Service: There are no bus routes in the immediate vicinity of the project site.
On-Street Parking: On-street parking is not present in the vicinity of the project site.
Data Collection
The AM and PM peak period turning movement counts f or the study intersections were
conducted by Short Counts, LLC on March 3, 2026, an d March 10, 2026. AM and PM peak
hour turning movement counts are summarized in Figure 3.
Additionally, AADT counts are available on the SCDO T Traffic Data and Analysis Web site for
Site ID 32-0711, Description S-132 : SC 6 (S LAKE D R) TO S- 337 (SWARTZ RD); Site ID 32-
0467, Description S-626 : S- 1448 (ZENKER RD) TO SC 6 (S LAKE DR); Site ID 32-
0219, Description SC6 : L- 1657 (MAIDEN LN) TO I- 2 0 (INTERSTATE 20); and Site ID 32-
0693, Description S-337 : US 1 (E MAIN ST) TO SC 6 (S LAKE DR).
The reports of the traffic counts conducted for this project are presented in Appendix B.
Traffic Conditions
Base future growth analysis was derived from SCDOT’ s Traffic Analysis and Data Application
website using the available SCDOT count stations ne ar the site. Using AADT years 2015
through 2024, a 1.48% weighted average growth rate was calculated. The 1.48% growth rate
was applied to existing volumes to obtain a horizon year of 2028 (completion year of 2027
plus one year) to establish the 2028 Background traffic model.
The 2026 Existing AM and PM peak hour turning movem ent volumes are summarized in
Figure 3. The resulting 2028 Background AM and PM peak hour turning movement volumes
are summarized in Figure 4. Intersection reports in Appendix C show the turning movement
volumes for the Existing, Background, and Build conditions.
Traffic Impact Analysis ALA Charter School Lexingt on
10
Proposed Development
As presented in the Site Plan (Figure 2), the new U pper School Building will be built on the
existing site on the east side of SC 6 (S Lake Road ) north of its intersection with Industrial
Drive/Glassmaster Road (S-626). Proposed land use for the site includes a Charter School (K-
12) with a capacity of 2600 Students; existing stud ent population was assumed to be 1674
based on actual attendance when traffic counts were obtained for the study.
Traffic to and from the site will use the existing access on SC 6 (S Lake Road) via Innovation
Place approximately 700 feet north of Industrial Dr ive/Glassmaster Road (S-626), and the
existing School Access on Bruner Road approximately 300 feet east of Glassmaster Road (S-
626).
Trip Generation
Trips to and from the proposed expansion were estim ated using the Institute of
Transportation Engineers’ Trip Generation Manual, 1 2th Edition. ITE Land Use 538 – Charter
School (K-12) was compared with the actual rate counted for the peak hour of the generator
in the AM and PM peak hours. Existing actual rates were chosen in coordination with SCDOT
to calculate expected new trips from the expansion. The results of the trip generation analysis
are summarized in Table 2, and printed reports from the spreadsheet of the calculations are
included in Appendix B.
Site Trips
Based on the observed traffic patterns in the vicinity of the site, trip distribution was
developed for the new site trips during the AM and PM peak hours. The trip distribution
with trip assignment percentages and net new trips are illustrated in Figures 5 and 6.
The site generated traffic was added to 2028 Background traffic to determine turning
movement volumes for the analysis intersections in the AM and PM peak hours for the
2028 Build conditions, shown in Figure 7.
Table 2
Trip Generation Analysis
American Leadership Academy Charter School, Lexington SC TIA
Land Use Independent
Variable
AM Peak
Hour Trips
PM Peak Hour
Trips
Entry Exit Entry Exit
Charter School (K-12) – ITE Land Use – 538 Students (926) 544 348 255 382
891 637
Traffic Impact Analysis ALA Charter School Lexingt on
14
Traffic Analysis
Intersection Level of Service (LOS) analyses were p erformed in accordance with the
procedures set forth and recommended by the Highway Capacity Manual (HCM) Level of
Service methodologies for evaluation of signalized and unsignalized intersections. Traffic
analysis software Synchro was used to evaluate the operation of the study intersections . The
Level of Service criteria for signalized and unsignalized intersections are listed below in Table
3. LOS ‘A’ is considered the best free-flow conditi ons and LOS ‘F’ is considered failing
conditions. LOS ‘D’ is considered acceptable during the peak hours by most agencies.
Table 3
Level of Service (LOS) Criteria for Intersections
American Leadership Academy Charter School, Lexington SC TIA
LOS Signalized Intersection Unsignalized Intersections
Delay (sec/veh) Delay (sec/veh)
A 0-10 0-10
B >10-20 >10-15
C >20-35 >15-25
D >35-55 >25-35
E >55-80 >35-50
F >80 >50
Using the traffic volumes for the Existing, Background, and Build conditions, the AM and PM
peak hour levels of service for the study intersect ions were determined, and they are
summarized in Tables 4 and 5. Detailed levels of service reports are included in Appendix C.
Traffic Impact Analysis ALA Charter School Lexingt on
15
Table 4
Intersection Level of Service and Delay
American Leadership Academy Charter School, Lexington SC TIA
Intersection Approach
LOS/Delay (seconds)
2026 Existing
Conditions
2028
Background
Conditions
2028 Build
Conditions
2028 Build
Conditions with
Mitigation
SC 6 (S Lake Rd)
at Industrial
Dr/Glassmaster
Rd (S-626) 1
S-626 EB Lt AM D/37.6 D/39.9 F/110.4 C/30.0
PM D/38.2 D/39.8 D/49.5 C/26.7
S-626 EB Th AM D/37.6 D/39.9 F/110.4 E/ 60 .2
PM D/38.2 D/39.8 D/49.5 D/ 39 .4
S-626 EB Rt AM C/32.9 C/34.7 D/4 3.8 E/ 64.1
PM C/31.3 C/32.6 D/36.1 D/36. 2
S-626 WB Lt AM D/40.6 D/41.7 E/55.6 D/35.9
PM D/44.9 D/47.4 E/58.2 C/29.5
S-626 WB Rt Th AM D/40.0 D/40.6 D/ 54.0 D/3 9.0
PM D/41.5 D/42.9 D/47.5 C/34.0
SC 6 NB Lt AM C/24.3 C/25.5 C/2 8.5 C/22.3
PM C/32.3 D/37.0 D/45.4 D/ 39.0
SC 6 NB Th AM C/33.1 C/ 34.5 D/4 5.4 D/36.3
PM C/25.5 C/26.4 C/31.2 C/31. 6
SC 6 NB Rt AM B/19.6 B/19.9 D/41.1 D/3 7.8
PM B/12.6 B/12.7 B/14.0 B/14. 7
SC 6 SB Lt AM C/24.4 C/25.6 F/105.2 D/ 50.2
PM B/19.7 C/20.5 C/24.9 C/25.5
SC 6 SB Th Rt AM C/33.2 C/34.3 D/36.8 C/29.8
PM D/41.1 D/44.6 D/52.3 D/5 0.9
Overall AM C/31.9 C/33.1 D/ 52.3 D/ 39.1
PM C/33.3 D/35.5 D/41.6 D/ 35.6
Glassmaster Rd
(S-626) at Bruner
Rd 2
S-626 NB Lt3 AM D/28.3 C/24.8 F/ 144.0 F/ 137 .5
PM C/16.2 C/16.8 E/40.0 E/ 43 .1
S-626 NB Rt3 AM D/28.3 C/24.8 F/ 144 .0 C/21.6
PM C/16.2 C/16.8 E/40.0 B/12.1
Bruner Rd WB
Lt 4
AM A/9.5 A/9. 1 B/11. 4 B/11. 4
PM A/8.2 A/8.2 A/8. 8 A/8. 8
Bruner Rd at
School Access 2
Bruner Rd EB
Lt 4
AM A/9.3 A/ 8.8 B/1 2.7 B/1 2.7
PM A/7.9 A/7.9 A/8.6 A/8. 5
School Access
SB Lt 3
AM F/638.7 - - -
PM B/11.4 - - -
School Access
SB Rt3
AM F/638.7 B/11.0 B/14.6 B/14.6
PM B/11.4 B/11.6 C/16.5 C/15. 8
SC6 (S Lake Rd) at
Innovation Pl 2
Innovation Pl
WB Lt 3
AM E/36.3 E/3 9.5 F/86 .8 F/70 .7
PM D/34.3 E/36.8 F/56. 5 F/55.9
Innovation Pl
WB Rt3
AM C/20.4 C/2 1.7 E/4 4.7 D/29.9
PM C/17.6 C/18.4 D/25.4 C/23.0
SC 6 SB Lt 4 AM B/11.8 B/12.0 B/13. 5 B/13. 5
PM B/11.1 B/11.3 B/12.0 B/1 1.9
1 Traffic Signal
2 Two-Way Stop Control
3 LOS/Delay for minor street approach
4LOS/Delay for major street left turn movement
Traffic Impact Analysis ALA Charter School Lexingt on
16
Turn Lane Analysis
The SCDOT Roadway Design Manual Chapter 9 turn lane requirements were reviewed for
the study area intersections. Graphs showing the results for each uncontrolled intersection
approach can be found in Appendix D. For the signalized intersection and stop controlled
approaches, turn lane needs are based on capacity analysis.
At the intersection of Bruner Road and Glassmaster Road (S-626), a left turn lane on Bruner
Road should be considered. The left turn lane was included in the traffic analysis for the
Build conditions with Mitigation, along with an added left turn lane on the stop-controlled
approach for comparison. The graph of the Build traffic volumes on Bruner Road at the
School Access showed that a left turn lane is not necessary.
For the northbound approach on SC 6 (S Lake Road) at Innovation Pl, a check of Figure 9.5-B
in the SCDOT Roadway Design Manual shows that a right turn lane should be considered.
Although the graph is noted to be only applicable on highways with a design speed of 50
miles per hour or greater, due to the high turning volume and through volume,
consideration of a northbound right turn lane is recommended.
The intersection of SC 6 (S Lake Road) at Industrial Drive/Glassmaster Road (S-626) was
reviewed with an additional eastbound lane to accommodate exclusive left turns, an
exclusive through lane, and an exclusive right turn lane in the eastbound direction for the
Mitigated Build conditions. This change allows the signal to be operated with concurrent
side street through movements which would improve efficiency.
Findings and Conclusions
At the intersection of SC 6 (S Lake Road) at Indust rial Drive/Glassmaster Road (S-626), LOS C
overall is experienced in the AM 2028 Background pe ak hour, and LOS D overall in the PM
2028 Background peak hour. In the 2028 Build condi tions, LOS D overall is experienced in
both the AM peak hour and the PM peak hour. In the 2028 Mitigated Build conditions, overall
delay improved by more than 13 seconds in the AM pe ak hour, and improved by 6 seconds
in the PM peak hour as compared with the unmitigated 2028 Build conditions.
The single-lane northbound approach of Glassmaster Road (S-626) to Bruner Road would
experience LOS F during the AM peak hour in the 202 8 Build conditions. If an exclusive left
turn lane was added on Bruner Road and on the stop- controlled approach of Glassmaster
Road (S-626), the LOS on the stop-controlled approa ch would improve to LOS C for the right
turn movement and would remain LOS F for the left t urn movement during the AM peak
hour. During the PM peak hour, the LOS on the stop-controlled approach would be LOS B for
the right turn movement and LOS E for the left turn movement.
It was found that School Access has a poor level of service (LOS) of F for the southbound
approach to Bruner Road during the Existing AM peak hour. Since the counts were taken, ALA
Charter School implemented a new traffic pattern wh ere traffic on the School Access
approach was restricted to Right Turn Only during s chool arrival and dismissal times. With
the elimination of the left turns out of the School Access (and the elimination of right turns
into the School Access), the LOS on the School Acce ss approach improved from LOS F during
the AM peak hour in Existing conditions, to LOS C o r better in all Background and Build
conditions.
Traffic Impact Analysis ALA Charter School Lexingt on
17
At the intersection of SC 6 (S Lake Road) at Innova tion Pl, LOS F is experienced for the left
turn approach on Innovation Pl in the 2028 Build co nditions AM peak hour and in the PM
peak hour. Right turns from Innovation Pl will exp erience LOS E during the 2028 Build
conditions AM peak hour. During the 2028 Build con ditions PM peak hour, right turns from
Innovation Pl would experience LOS D. The 2028 Mitigated Build conditions would include a
northbound right turn lane and would slightly impro ve the delay for the left turn from
Innovation Pl during the AM and PM peak hours, and the right turn from Innovation Pl would
be LOS D or better during both peak hours.
Recommendations
After consideration of the traffic analysis of the American Leadership Academy (ALA) Charter
School Expansion on SC 6 (S Lake Road) and Bruner Road, the following is recommended:
• Coordinate with the Town of Lexington for the possi ble widening of Bruner Road
between Glassmaster Road (S-626) and the School Acc ess to accommodate an
exclusive left turn lane into Glassmaster Road (S-6 26) which would include a full 3-
lane pavement width between the intersections.
• Consider the feasibility of widening Industrial Drive (S-626) at SC 6 (S Lake Rd) adjacent
to the Whataburger property to accommodate an addit ional lane on Industrial Drive
(S-626), allowing for separate left-, through-, and right-turn lanes on the eastbound
approach. The additional lane would enable a chang e in the operation of the traffic
signal from the current split phase operation to co ncurrent side street through
movements, improving efficiency.
• Consider the construction of a northbound right tur n lane on SC 6 (S Lake Road) at
Innovation Pl to accommodate school traffic.
• Continue to prohibit left-turns out of the School Access as well as right-turns into the
School Access at Bruner Road during drop-off/pick-up peak hours.
The study concludes that the public roadway system serving the site can accommodate the
anticipated traffic volumes generated by the propos ed development with consideration of
the mitigation measures analyzed.
Traffic Impact Analysis ALA Charter School Lexingt on
18
Appendices
Appendix A Site Photographs
Appendix B Traffic Counts and Trip Generation
Appendix C Intersection Reports
Appendix D Turn Lane Graphs
Appendix A Site Photographs
SC 6 at S-626 looking north
SC 6 at S-626 looking east
SC 6 at S-626 looking south
SC 6 at S-626 looking west
Bruner Rd at Glassmaster Rd looking north
Bruner Rd at Glassmaster Rd looking east
Bruner Rd at Glassmaster Rd looking south
Bruner Rd at Glassmaster Rd looking west
Bruner Rd at School Access looking north
Bruner Rd at School Access looking east
Bruner Rd at School Access looking south
Bruner Rd at School Access looking west
SC 6 at Innovation Pl looking north
SC 6 at Innovation Pl looking east
SC 6 at Innovation Pl looking south
SC 6 at Innovation Pl looking west
Appendix B Traffic Counts and Trip Generation
File Name : SC 6 @ Glassmaster-Industrial Dr
Site Code :
Start Date : 03/03/2026
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
SC 6
Southbound
Glassmaster Rd
Westbound
SC 6
Northbound
Industrial Dr
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
07:00 26 108 12 0 29 19 6 0 62 199 79 0 19 24 95 0 678
07:15 46 130 4 0 96 34 9 0 57 178 139 0 29 28 95 0 845
07:30 38 147 13 0 73 28 11 0 52 227 114 0 24 32 76 0 835
07:45 17 151 13 0 75 25 6 0 64 242 85 0 18 25 86 0 807
Total 127 536 42 0 273 106 32 0 235 846 417 0 90 109 352 0 3165
08:00 28 145 11 0 93 28 14 0 50 206 65 0 23 39 84 0 786
08:15 19 171 8 0 86 25 11 0 50 248 56 0 26 23 59 0 782
08:30 12 159 8 0 39 23 8 1 46 231 9 0 17 18 55 0 626
08:45 14 130 6 0 41 16 11 0 39 209 10 0 16 15 65 0 572
Total 73 605 33 0 259 92 44 1 185 894 140 0 82 95 263 0 2766
14:00 14 185 15 0 38 12 6 0 59 228 35 0 9 13 58 0 672
14:15 13 200 6 0 27 13 5 0 58 158 46 0 15 16 54 0 611
14:30 32 194 8 0 51 19 11 1 57 189 47 0 21 19 46 1 696
14:45 21 213 11 0 104 25 9 0 54 221 71 0 21 16 44 0 810
Total 80 792 40 0 220 69 31 1 228 796 199 0 66 64 202 1 2789
15:00 16 228 8 0 55 16 11 0 51 196 28 0 29 16 60 0 714
15:15 17 204 13 0 57 15 10 0 60 199 41 0 25 10 57 0 708
15:30 19 213 12 0 117 29 12 0 65 245 53 0 26 19 95 0 905
15:45 10 227 9 0 105 26 11 0 64 213 16 0 24 8 68 0 781
Total 62 872 42 0 334 86 44 0 240 853 138 0 104 53 280 0 3108
Grand Total 342 2805 157 0 1086 353 151 2 888 3389 894 0 342 321 1097 1 11828
Apprch % 10.4 84.9 4.8 0 68.2 22.2 9.5 0.1 17.2 65.5 17.3 0 19.4 18.2 62.3 0.1
Total % 2.9 23.7 1.3 0 9.2 3 1.3 0 7.5 28.7 7.6 0 2.9 2.7 9.3 0
Passenger Vehicles 329 2736 152 0 1020 325 137 2 828 3317 873 0 318 308 1037 1 11383
% Passenger Vehicles 96.2 97.5 96.8 0 93.9 92.1 90.7 100 93.2 97.9 97.7 0 93 96 94.5 100 96.2
Heavy Vehicles 12 40 3 0 64 26 12 0 60 55 21 0 20 13 58 0 384
% Heavy Vehicles 3.5 1.4 1.9 0 5.9 7.4 7.9 0 6.8 1.6 2.3 0 5.8 4 5.3 0 3.2
Buses 1 29 2 0 2 2 2 0 0 17 0 0 4 0 2 0 61
% Buses 0.3 1 1.3 0 0.2 0.6 1.3 0 0 0.5 0 0 1.2 0 0.2 0 0.5
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : SC 6 @ Glassmaster-Industrial Dr
Site Code :
Start Date : 03/03/2026
Page No : 2
SC 6
Industrial Dr
Glassmaster Rd
SC 6
Right
152
3
2
157
Thru
2736
40
29
2805
Left
329
12
1
342
Peds
0
0
0
0
InOut Total
3772 3217 6989
87 55 142
23 32 55
3882 7186 3304
Right
137
12
2
151
Thru
325
26
2
353
Left
1020
64
2
1086
Peds
2
0
0
2
OutTotal In
1510 1484 2994
46 102 148
1 6 7
1557 3149 1592
Left
828
60
0
888
Thru
3317
55
17
3389
Right
873
21
0
894
Peds
0
0
0
0
Out TotalIn
4793 5018 9811
162 136 298
33 17 50
4988 10159 5171
Left
318
20
4
342
Thru
308
13
0
321
Right
1037
58
2
1097
Peds
1
0
0
1
TotalOut In
1305 1664 2969
89 91 180
4 6 10
1398 3159 1761
03/03/2026 07:00
03/03/2026 15:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : SC 6 @ Glassmaster-Industrial Dr
Site Code :
Start Date : 03/03/2026
Page No : 3
SC 6
Southbound
Glassmaster Rd
Westbound
SC 6
Northbound
Industrial Dr
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15
07:15 46 130 4 0 180 96 34 9 0 139 57 178 139 0 374 29 28 95 0 152 845
07:30 38 147 13 0 198 73 28 11 0 112 52 227 114 0 393 24 32 76 0 132 835
07:45 17 151 13 0 181 75 25 6 0 106 64 242 85 0 391 18 25 86 0 129 807
08:00 28 145 11 0 184 93 28 14 0 135 50 206 65 0 321 23 39 84 0 146 786
Total Volume 129 573 41 0 743 337 115 40 0 492 223 853 403 0 1479 94 124 341 0 559 3273
% App. Total 17.4 77.1 5.5 0 68.5 23.4 8.1 0 15.1 57.7 27.2 0 16.8 22.2 61 0
PHF .701 .949 .788 .000 .938 .878 .846 .714 .000 .885 .871 .881 .725 .000 .941 .810 .795 .897 .000 .919 .968
Passenger Vehicles 125 558 40 0 723 315 108 35 0 458 207 838 400 0 1445 82 122 321 0 525 3151
% Passenger Vehicles
Heavy Vehicles 4 9 1 0 14 22 7 4 0 33 16 14 3 0 33 9 2 20 0 31 111
% Heavy Vehicles 3.1 1.6 2.4 0 1.9 6.5 6.1 10.0 0 6.7 7.2 1.6 0.7 0 2.2 9.6 1.6 5.9 0 5.5 3.4
Buses 0 6 0 0 6 0 0 1 0 1 0 1 0 0 1 3 0 0 0 3 11
% Buses 0 1.0 0 0 0.8 0 0 2.5 0 0.2 0 0.1 0 0 0.1 3.2 0 0 0 0.5 0.3
SC 6
Industrial Dr
Glassmaster Rd
SC 6
Right
40
1
0
41
Thru
558
9
6
573
Left
125
4
0
129
Peds
0
0
0
0
InOut Total
955 723 1678
27 14 41
5 6 11
987 1730 743
Right
35
4
1
40
Thru
108
7
0
115
Left
315
22
0
337
Peds
0
0
0
0
OutTotal In
647 458 1105
9 33 42
0 1 1
656 1148 492
Left
207
16
0
223
Thru
838
14
1
853
Right
400
3
0
403
Peds
0
0
0
0
Out TotalIn
1194 1445 2639
51 33 84
6 1 7
1251 2730 1479
Left
82
9
3
94
Thru
122
2
0
124
Right
321
20
0
341
Peds
0
0
0
0
TotalOut In
355 525 880
24 31 55
0 3 3
379 938 559
Peak Hour Begins at 07:15
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : SC 6 @ Glassmaster-Industrial Dr
Site Code :
Start Date : 03/03/2026
Page No : 4
SC 6
Southbound
Glassmaster Rd
Westbound
SC 6
Northbound
Industrial Dr
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 14:45
14:45 21 213 11 0 245 104 25 9 0 138 54 221 71 0 346 21 16 44 0 81 810
15:00 16 228 8 0 252 55 16 11 0 82 51 196 28 0 275 29 16 60 0 105 714
15:15 17 204 13 0 234 57 15 10 0 82 60 199 41 0 300 25 10 57 0 92 708
15:30 19 213 12 0 244 117 29 12 0 158 65 245 53 0 363 26 19 95 0 140 905
Total Volume 73 858 44 0 975 333 85 42 0 460 230 861 193 0 1284 101 61 256 0 418 3137
% App. Total 7.5 88 4.5 0 72.4 18.5 9.1 0 17.9 67.1 15 0 24.2 14.6 61.2 0
PHF .869 .941 .846 .000 .967 .712 .733 .875 .000 .728 .885 .879 .680 .000 .884 .871 .803 .674 .000 .746 .867
Passenger Vehicles 72 838 43 0 953 320 78 40 0 438 213 850 186 0 1249 95 58 246 0 399 3039
% Passenger Vehicles
Heavy Vehicles 1 11 0 0 12 12 5 2 0 19 17 6 7 0 30 6 3 9 0 18 79
% Heavy Vehicles 1.4 1.3 0 0 1.2 3.6 5.9 4.8 0 4.1 7.4 0.7 3.6 0 2.3 5.9 4.9 3.5 0 4.3 2.5
Buses 0 9 1 0 10 1 2 0 0 3 0 5 0 0 5 0 0 1 0 1 19
% Buses 0 1.0 2.3 0 1.0 0.3 2.4 0 0 0.7 0 0.6 0 0 0.4 0 0 0.4 0 0.2 0.6
SC 6
Industrial Dr
Glassmaster Rd
SC 6
Right
43
0
1
44
Thru
838
11
9
858
Left
72
1
0
73
Peds
0
0
0
0
InOut Total
985 953 1938
14 12 26
5 10 15
1004 1979 975
Right
40
2
0
42
Thru
78
5
2
85
Left
320
12
1
333
Peds
0
0
0
0
OutTotal In
316 438 754
11 19 30
0 3 3
327 787 460
Left
213
17
0
230
Thru
850
6
5
861
Right
186
7
0
193
Peds
0
0
0
0
Out TotalIn
1404 1249 2653
32 30 62
11 5 16
1447 2731 1284
Left
95
6
0
101
Thru
58
3
0
61
Right
246
9
1
256
Peds
0
0
0
0
TotalOut In
334 399 733
22 18 40
3 1 4
359 777 418
Peak Hour Begins at 14:45
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Glassmaster Rd-Innovation Pl @ Glassmaster-Bruner Rd
Site Code :
Start Date : 03/03/2026
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
Innovation Pl
Southbound
Bruner Rd
Westbound
Glassmaster Rd
Northbound
Glassmaster Rd
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
07:00 0 0 0 0 2 13 0 0 17 0 14 0 1 95 15 0 157
07:15 0 1 0 0 21 95 0 0 10 0 32 0 0 185 14 0 358
07:30 0 0 1 0 22 83 0 0 10 0 30 0 0 177 18 0 341
07:45 0 0 0 0 17 52 0 0 17 0 12 0 1 82 26 0 207
Total 0 1 1 0 62 243 0 0 54 0 88 0 2 539 73 0 1063
08:00 0 0 0 0 39 75 0 0 7 1 30 0 2 93 15 0 262
08:15 0 0 1 0 17 82 1 0 15 0 16 0 3 79 13 0 227
08:30 0 0 1 0 1 12 0 0 11 1 1 0 4 7 9 0 47
08:45 0 0 0 0 2 11 0 0 13 0 1 3 3 7 17 0 57
Total 0 0 2 0 59 180 1 0 46 2 48 3 12 186 54 0 593
14:00 0 0 2 0 0 6 0 0 14 0 3 0 0 40 15 0 80
14:15 0 0 1 0 0 6 0 0 7 0 3 0 0 54 13 0 84
14:30 0 0 1 0 4 41 0 0 18 1 14 0 1 79 11 0 170
14:45 0 0 0 1 18 111 0 1 15 0 25 0 0 106 14 0 291
Total 0 0 4 1 22 164 0 1 54 1 45 0 1 279 53 0 625
15:00 0 0 1 1 4 21 0 0 17 0 10 0 0 53 21 0 128
15:15 0 0 2 0 2 27 0 0 19 0 5 0 0 50 10 0 115
15:30 0 0 1 0 39 141 0 0 5 0 9 0 0 61 13 0 269
15:45 0 0 2 0 24 68 0 0 29 0 1 0 0 22 14 0 160
Total 0 0 6 1 69 257 0 0 70 0 25 0 0 186 58 0 672
Grand Total 0 1 13 2 212 844 1 1 224 3 206 3 15 1190 238 0 2953
Apprch % 0 6.2 81.2 12.5 20 79.8 0.1 0.1 51.4 0.7 47.2 0.7 1 82.5 16.5 0
Total % 0 0 0.4 0.1 7.2 28.6 0 0 7.6 0.1 7 0.1 0.5 40.3 8.1 0
Passenger Vehicles 0 1 13 2 210 831 1 1 199 3 206 3 15 1183 213 0 2881
% Passenger Vehicles 0 100 100 100 99.1 98.5 100 100 88.8 100 100 100 100 99.4 89.5 0 97.6
Heavy Vehicles 0 0 0 0 2 11 0 0 22 0 0 0 0 7 24 0 66
% Heavy Vehicles 0 0 0 0 0.9 1.3 0 0 9.8 0 0 0 0 0.6 10.1 0 2.2
Buses 0 0 0 0 0 2 0 0 3 0 0 0 0 0 1 0 6
% Buses 0 0 0 0 0 0.2 0 0 1.3 0 0 0 0 0 0.4 0 0.2
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Glassmaster Rd-Innovation Pl @ Glassmaster-Bruner Rd
Site Code :
Start Date : 03/03/2026
Page No : 2
Innovation Pl
Glassmaster Rd
Bruner Rd
Glassmaster Rd
Right
13
0
0
13
Thru
1
0
0
1
Left
0
0
0
0
Peds
2
0
0
2
InOut Total
19 16 35
0 0 0
0 0 0
19 35 16
Right
1
0
0
1
Thru
831
11
2
844
Left
210
2
0
212
Peds
1
0
0
1
OutTotal In
1389 1043 2432
7 13 20
0 2 2
1396 2454 1058
Left
199
22
3
224
Thru
3
0
0
3
Right
206
0
0
206
Peds
3
0
0
3
Out TotalIn
424 411 835
26 22 48
1 3 4
451 887 436
Left
15
0
0
15
Thru
1183
7
0
1190
Right
213
24
1
238
Peds
0
0
0
0
TotalOut In
1043 1411 2454
33 31 64
5 1 6
1081 2524 1443
03/03/2026 07:00
03/03/2026 15:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Glassmaster Rd-Innovation Pl @ Glassmaster-Bruner Rd
Site Code :
Start Date : 03/03/2026
Page No : 3
Innovation Pl
Southbound
Bruner Rd
Westbound
Glassmaster Rd
Northbound
Glassmaster Rd
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15
07:15 0 1 0 0 1 21 95 0 0 116 10 0 32 0 42 0 185 14 0 199 358
07:30 0 0 1 0 1 22 83 0 0 105 10 0 30 0 40 0 177 18 0 195 341
07:45 0 0 0 0 0 17 52 0 0 69 17 0 12 0 29 1 82 26 0 109 207
08:00 0 0 0 0 0 39 75 0 0 114 7 1 30 0 38 2 93 15 0 110 262
Total Volume 0 1 1 0 2 99 305 0 0 404 44 1 104 0 149 3 537 73 0 613 1168
% App. Total 0 50 50 0 24.5 75.5 0 0 29.5 0.7 69.8 0 0.5 87.6 11.9 0
PHF .000 .250 .250 .000 .500 .635 .803 .000 .000 .871 .647 .250 .813 .000 .887 .375 .726 .702 .000 .770 .816
Passenger Vehicles 0 1 1 0 2 99 303 0 0 402 39 1 104 0 144 3 535 70 0 608 1156
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 2 0 0 2 4 0 0 0 4 0 2 2 0 4 10
% Heavy Vehicles 0 0 0 0 0 0 0.7 0 0 0.5 9.1 0 0 0 2.7 0 0.4 2.7 0 0.7 0.9
Buses 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 1 0 1 2
% Buses 0 0 0 0 0 0 0 0 0 0 2.3 0 0 0 0.7 0 0 1.4 0 0.2 0.2
Innovation Pl
Glassmaster Rd
Bruner Rd
Glassmaster Rd
Right
1
0
0
1
Thru
1
0
0
1
Left
0
0
0
0
Peds
0
0
0
0
InOut Total
4 2 6
0 0 0
0 0 0
4 6 2
Right
0
0
0
0
Thru
303
2
0
305
Left
99
0
0
99
Peds
0
0
0
0
OutTotal In
639 402 1041
2 2 4
0 0 0
641 1045 404
Left
39
4
1
44
Thru
1
0
0
1
Right
104
0
0
104
Peds
0
0
0
0
Out TotalIn
170 144 314
2 4 6
1 1 2
173 322 149
Left
3
0
0
3
Thru
535
2
0
537
Right
70
2
1
73
Peds
0
0
0
0
TotalOut In
343 608 951
6 4 10
1 1 2
350 963 613
Peak Hour Begins at 07:15
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Glassmaster Rd-Innovation Pl @ Glassmaster-Bruner Rd
Site Code :
Start Date : 03/03/2026
Page No : 4
Innovation Pl
Southbound
Bruner Rd
Westbound
Glassmaster Rd
Northbound
Glassmaster Rd
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 14:45
14:45 0 0 0 1 1 18 111 0 1 130 15 0 25 0 40 0 106 14 0 120 291
15:00 0 0 1 1 2 4 21 0 0 25 17 0 10 0 27 0 53 21 0 74 128
15:15 0 0 2 0 2 2 27 0 0 29 19 0 5 0 24 0 50 10 0 60 115
15:30 0 0 1 0 1 39 141 0 0 180 5 0 9 0 14 0 61 13 0 74 269
Total Volume 0 0 4 2 6 63 300 0 1 364 56 0 49 0 105 0 270 58 0 328 803
% App. Total 0 0 66.7 33.3 17.3 82.4 0 0.3 53.3 0 46.7 0 0 82.3 17.7 0
PHF .000 .000 .500 .500 .750 .404 .532 .000 .250 .506 .737 .000 .490 .000 .656 .000 .637 .690 .000 .683 .690
Passenger Vehicles 0 0 4 2 6 62 297 0 1 360 47 0 49 0 96 0 269 52 0 321 783
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 1 1 0 0 2 8 0 0 0 8 0 1 6 0 7 17
% Heavy Vehicles 0 0 0 0 0 1.6 0.3 0 0 0.5 14.3 0 0 0 7.6 0 0.4 10.3 0 2.1 2.1
Buses 0 0 0 0 0 0 2 0 0 2 1 0 0 0 1 0 0 0 0 0 3
% Buses 0 0 0 0 0 0 0.7 0 0 0.5 1.8 0 0 0 1.0 0 0 0 0 0 0.4
Innovation Pl
Glassmaster Rd
Bruner Rd
Glassmaster Rd
Right
4
0
0
4
Thru
0
0
0
0
Left
0
0
0
0
Peds
2
0
0
2
InOut Total
0 6 6
0 0 0
0 0 0
0 6 6
Right
0
0
0
0
Thru
297
1
2
300
Left
62
1
0
63
Peds
1
0
0
1
OutTotal In
318 360 678
1 2 3
0 2 2
319 683 364
Left
47
8
1
56
Thru
0
0
0
0
Right
49
0
0
49
Peds
0
0
0
0
Out TotalIn
114 96 210
7 8 15
0 1 1
121 226 105
Left
0
0
0
0
Thru
269
1
0
270
Right
52
6
0
58
Peds
0
0
0
0
TotalOut In
348 321 669
9 7 16
3 0 3
360 688 328
Peak Hour Begins at 14:45
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Bruner Rd @ School Access
Site Code : 03102026
Start Date : 03/10/2026
Page No : 1
-
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
School Access To Traffic
Circle
Southbound
Bruner Rd
Westbound Northbound
Bruner Rd
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
07:00 1 0 28 0 0 3 2 0 0 0 0 0 114 9 0 0 157
07:15 112 0 4 0 0 2 22 0 0 0 0 0 220 14 0 0 374
07:30 11 0 91 0 0 4 13 0 0 0 0 0 167 49 0 0 335
07:45 10 0 61 0 0 10 51 0 0 0 0 0 67 34 0 0 233
Total 134 0 184 0 0 19 88 0 0 0 0 0 568 106 0 0 1099
08:00 0 0 110 2 0 2 8 0 0 0 0 0 119 17 0 0 258
08:15 0 0 83 0 0 12 4 0 0 0 0 0 75 10 0 0 184
08:30 0 0 4 0 0 8 0 0 0 0 0 0 2 5 0 0 19
08:45 0 0 1 0 0 10 0 0 0 0 0 0 1 5 0 0 17
Total 0 0 198 2 0 32 12 0 0 0 0 0 197 37 0 0 478
14:00 0 0 2 0 0 2 17 0 0 0 0 0 14 24 0 0 59
14:15 0 2 4 0 0 2 0 0 0 0 0 0 46 12 0 0 66
14:30 2 0 38 0 0 13 3 0 0 0 0 0 70 17 0 0 143
14:45 3 0 148 0 0 4 11 0 0 0 0 0 111 37 0 0 314
Total 5 2 192 0 0 21 31 0 0 0 0 0 241 90 0 0 582
15:00 1 0 25 0 0 1 12 0 0 0 0 0 46 11 0 0 96
15:15 0 0 46 0 0 3 0 0 0 0 0 0 39 13 0 0 101
15:30 0 0 185 0 0 6 19 0 0 0 0 0 60 12 0 0 282
15:45 0 0 69 0 0 4 0 0 0 0 0 0 15 3 0 0 91
Total 1 0 325 0 0 14 31 0 0 0 0 0 160 39 0 0 570
Grand Total 140 2 899 2 0 86 162 0 0 0 0 0 1166 272 0 0 2729
Apprch % 13.4 0.2 86.2 0.2 0 34.7 65.3 0 0 0 0 0 81.1 18.9 0 0
Total % 5.1 0.1 32.9 0.1 0 3.2 5.9 0 0 0 0 0 42.7 10 0 0
Passenger Vehicles 140 2 893 2 0 81 162 0 0 0 0 0 1166 270 0 0 2716
% Passenger Vehicles 100 100 99.3 100 0 94.2 100 0 0 0 0 0 100 99.3 0 0 99.5
Heavy Vehicles 0 0 0 0 0 5 0 0 0 0 0 0 0 2 0 0 7
% Heavy Vehicles 0 0 0 0 0 5.8 0 0 0 0 0 0 0 0.7 0 0 0.3
Buses 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6
% Buses 0 0 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Bruner Rd @ School Access
Site Code : 03102026
Start Date : 03/10/2026
Page No : 2
School Access To Traffic Circle
Bruner Rd
Bruner Rd
Right
893
0
6
899
Thru
2
0
0
2
Left
140
0
0
140
Peds
2
0
0
2
InOut Total
1328 1037 2365
0 0 0
0 6 6
1328 2371 1043
Right
162
0
0
162
Thru
81
5
0
86
Left
0
0
0
0
Peds
0
0
0
0
OutTotal In
410 243 653
2 5 7
0 0 0
412 660 248
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
Out TotalIn
2 0 2
0 0 0
0 0 0
2 2 0
Left
1166
0
0
1166
Thru
270
2
0
272
Right
0
0
0
0
Peds
0
0
0
0
TotalOut In
974 1436 2410
5 2 7
6 0 6
985 2423 1438
03/10/2026 07:00
03/10/2026 15:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Bruner Rd @ School Access
Site Code : 03102026
Start Date : 03/10/2026
Page No : 3
School Access To Traffic Circle
Southbound
Bruner Rd
Westbound Northbound
Bruner Rd
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15
07:15 112 0 4 0 116 0 2 22 0 24 0 0 0 0 0 220 14 0 0 234 374
07:30 11 0 91 0 102 0 4 13 0 17 0 0 0 0 0 167 49 0 0 216 335
07:45 10 0 61 0 71 0 10 51 0 61 0 0 0 0 0 67 34 0 0 101 233
08:00 0 0 110 2 112 0 2 8 0 10 0 0 0 0 0 119 17 0 0 136 258
Total Volume 133 0 266 2 401 0 18 94 0 112 0 0 0 0 0 573 114 0 0 687 1200
% App. Total 33.2 0 66.3 0.5 0 16.1 83.9 0 0 0 0 0 83.4 16.6 0 0
PHF .297 .000 .605 .250 .864 .000 .450 .461 .000 .459 .000 .000 .000 .000 .000 .651 .582 .000 .000 .734 .802
Passenger Vehicles 133 0 266 2 401 0 17 94 0 111 0 0 0 0 0 573 114 0 0 687 1199
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1
% Heavy Vehicles 0 0 0 0 0 0 5.6 0 0 0.9 0 0 0 0 0 0 0 0 0 0 0.1
Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
School Access To Traffic Circle
Bruner Rd
Bruner Rd
Right
266
0
0
266
Thru
0
0
0
0
Left
133
0
0
133
Peds
2
0
0
2
InOut Total
667 401 1068
0 0 0
0 0 0
667 1068 401
Right
94
0
0
94
Thru
17
1
0
18
Left
0
0
0
0
Peds
0
0
0
0
OutTotal In
247 111 358
0 1 1
0 0 0
247 359 112
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
Out TotalIn
0 0 0
0 0 0
0 0 0
0 0 0
Left
573
0
0
573
Thru
114
0
0
114
Right
0
0
0
0
Peds
0
0
0
0
TotalOut In
283 687 970
1 0 1
0 0 0
284 971 687
Peak Hour Begins at 07:15
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Bruner Rd @ School Access
Site Code : 03102026
Start Date : 03/10/2026
Page No : 4
School Access To Traffic Circle
Southbound
Bruner Rd
Westbound Northbound
Bruner Rd
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 14:45
14:45 3 0 148 0 151 0 4 11 0 15 0 0 0 0 0 111 37 0 0 148 314
15:00 1 0 25 0 26 0 1 12 0 13 0 0 0 0 0 46 11 0 0 57 96
15:15 0 0 46 0 46 0 3 0 0 3 0 0 0 0 0 39 13 0 0 52 101
15:30 0 0 185 0 185 0 6 19 0 25 0 0 0 0 0 60 12 0 0 72 282
Total Volume 4 0 404 0 408 0 14 42 0 56 0 0 0 0 0 256 73 0 0 329 793
% App. Total 1 0 99 0 0 25 75 0 0 0 0 0 77.8 22.2 0 0
PHF .333 .000 .546 .000 .551 .000 .583 .553 .000 .560 .000 .000 .000 .000 .000 .577 .493 .000 .000 .556 .631
Passenger Vehicles 4 0 398 0 402 0 14 42 0 56 0 0 0 0 0 256 72 0 0 328 786
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
% Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4 0 0 0.3 0.1
Buses 0 0 6 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
% Buses 0 0 1.5 0 1.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8
School Access To Traffic Circle
Bruner Rd
Bruner Rd
Right
398
0
6
404
Thru
0
0
0
0
Left
4
0
0
4
Peds
0
0
0
0
InOut Total
298 402 700
0 0 0
0 6 6
298 706 408
Right
42
0
0
42
Thru
14
0
0
14
Left
0
0
0
0
Peds
0
0
0
0
OutTotal In
76 56 132
1 0 1
0 0 0
77 133 56
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
Out TotalIn
0 0 0
0 0 0
0 0 0
0 0 0
Left
256
0
0
256
Thru
72
1
0
73
Right
0
0
0
0
Peds
0
0
0
0
TotalOut In
412 328 740
0 1 1
6 0 6
418 747 329
Peak Hour Begins at 14:45
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : SC 6 @ Innovation Pl
Site Code :
Start Date : 03/03/2026
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
SC 6
Southbound
Innovation Pl
Westbound
SC 6
Northbound Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
07:00 10 153 0 0 10 0 11 0 0 193 29 0 0 0 0 0 406
07:15 8 181 0 0 18 0 64 0 0 172 37 0 0 0 0 0 480
07:30 30 172 0 0 23 0 59 0 0 229 41 0 0 0 0 0 554
07:45 16 180 0 0 17 0 33 0 0 234 26 0 0 0 0 0 506
Total 64 686 0 0 68 0 167 0 0 828 133 0 0 0 0 0 1946
08:00 5 185 0 0 21 0 61 0 0 228 16 0 0 0 0 0 516
08:15 4 179 0 0 14 0 49 1 0 265 13 0 0 0 0 0 525
08:30 6 186 0 0 4 0 7 1 0 281 3 0 0 0 0 0 488
08:45 6 144 0 0 0 0 3 0 0 232 5 0 0 0 0 0 390
Total 21 694 0 0 39 0 120 2 0 1006 37 0 0 0 0 0 1919
14:00 1 211 0 0 3 0 5 0 0 236 5 0 0 0 0 0 461
14:15 2 225 0 0 3 0 3 0 0 176 7 0 0 0 0 0 416
14:30 6 236 0 0 16 0 12 0 0 208 18 0 0 0 0 0 496
14:45 5 236 0 0 13 0 57 0 0 238 29 0 0 0 0 0 578
Total 14 908 0 0 35 0 77 0 0 858 59 0 0 0 0 0 1951
15:00 9 261 0 0 14 0 12 0 0 210 24 0 0 0 0 0 530
15:15 4 224 0 0 19 0 19 1 0 216 27 0 0 0 0 0 510
15:30 2 227 0 0 27 0 76 0 0 268 10 0 0 0 0 0 610
15:45 4 221 0 0 22 0 39 0 0 242 6 0 0 0 0 0 534
Total 19 933 0 0 82 0 146 1 0 936 67 0 0 0 0 0 2184
Grand Total 118 3221 0 0 224 0 510 3 0 3628 296 0 0 0 0 0 8000
Apprch % 3.5 96.5 0 0 30.4 0 69.2 0.4 0 92.5 7.5 0 0 0 0 0
Total % 1.5 40.3 0 0 2.8 0 6.4 0 0 45.3 3.7 0 0 0 0 0
Passenger Vehicles 118 3133 0 0 221 0 510 3 0 3533 291 0 0 0 0 0 7809
% Passenger Vehicles 100 97.3 0 0 98.7 0 100 100 0 97.4 98.3 0 0 0 0 0 97.6
Heavy Vehicles 0 58 0 0 0 0 0 0 0 78 0 0 0 0 0 0 136
% Heavy Vehicles 0 1.8 0 0 0 0 0 0 0 2.1 0 0 0 0 0 0 1.7
Buses 0 30 0 0 3 0 0 0 0 17 5 0 0 0 0 0 55
% Buses 0 0.9 0 0 1.3 0 0 0 0 0.5 1.7 0 0 0 0 0 0.7
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : SC 6 @ Innovation Pl
Site Code :
Start Date : 03/03/2026
Page No : 2
SC 6
Innovation Pl
SC 6
Right
0
0
0
0
Thru
3133
58
30
3221
Left
118
0
0
118
Peds
0
0
0
0
InOut Total
4043 3251 7294
78 58 136
17 30 47
4138 7477 3339
Right
510
0
0
510
Thru
0
0
0
0
Left
221
0
3
224
Peds
3
0
0
3
OutTotal In
409 734 1143
0 0 0
5 3 8
414 1151 737
Left
0
0
0
0
Thru
3533
78
17
3628
Right
291
0
5
296
Peds
0
0
0
0
Out TotalIn
3354 3824 7178
58 78 136
33 22 55
3445 7369 3924
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
TotalOut In
0 0 0
0 0 0
0 0 0
0 0 0
03/03/2026 07:00
03/03/2026 15:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : SC 6 @ Innovation Pl
Site Code :
Start Date : 03/03/2026
Page No : 3
SC 6
Southbound
Innovation Pl
Westbound
SC 6
Northbound Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30
07:30 30 172 0 0 202 23 0 59 0 82 0 229 41 0 270 0 0 0 0 0 554
07:45 16 180 0 0 196 17 0 33 0 50 0 234 26 0 260 0 0 0 0 0 506
08:00 5 185 0 0 190 21 0 61 0 82 0 228 16 0 244 0 0 0 0 0 516
08:15 4 179 0 0 183 14 0 49 1 64 0 265 13 0 278 0 0 0 0 0 525
Total Volume 55 716 0 0 771 75 0 202 1 278 0 956 96 0 1052 0 0 0 0 0 2101
% App. Total 7.1 92.9 0 0 27 0 72.7 0.4 0 90.9 9.1 0 0 0 0 0
PHF .458 .968 .000 .000 .954 .815 .000 .828 .250 .848 .000 .902 .585 .000 .946 .000 .000 .000 .000 .000 .948
Passenger Vehicles 55 685 0 0 740 75 0 202 1 278 0 936 96 0 1032 0 0 0 0 0 2050
% Passenger Vehicles
Heavy Vehicles 0 19 0 0 19 0 0 0 0 0 0 18 0 0 18 0 0 0 0 0 37
% Heavy Vehicles 0 2.7 0 0 2.5 0 0 0 0 0 0 1.9 0 0 1.7 0 0 0 0 0 1.8
Buses 0 12 0 0 12 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 14
% Buses 0 1.7 0 0 1.6 0 0 0 0 0 0 0.2 0 0 0.2 0 0 0 0 0 0.7
SC 6
Innovation Pl
SC 6
Right
0
0
0
0
Thru
685
19
12
716
Left
55
0
0
55
Peds
0
0
0
0
InOut Total
1138 740 1878
18 19 37
2 12 14
1158 1929 771
Right
202
0
0
202
Thru
0
0
0
0
Left
75
0
0
75
Peds
1
0
0
1
OutTotal In
151 278 429
0 0 0
0 0 0
151 429 278
Left
0
0
0
0
Thru
936
18
2
956
Right
96
0
0
96
Peds
0
0
0
0
Out TotalIn
760 1032 1792
19 18 37
12 2 14
791 1843 1052
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
TotalOut In
0 0 0
0 0 0
0 0 0
0 0 0
Peak Hour Begins at 07:30
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : SC 6 @ Innovation Pl
Site Code :
Start Date : 03/03/2026
Page No : 4
SC 6
Southbound
Innovation Pl
Westbound
SC 6
Northbound Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 14:45
14:45 5 236 0 0 241 13 0 57 0 70 0 238 29 0 267 0 0 0 0 0 578
15:00 9 261 0 0 270 14 0 12 0 26 0 210 24 0 234 0 0 0 0 0 530
15:15 4 224 0 0 228 19 0 19 1 39 0 216 27 0 243 0 0 0 0 0 510
15:30 2 227 0 0 229 27 0 76 0 103 0 268 10 0 278 0 0 0 0 0 610
Total Volume 20 948 0 0 968 73 0 164 1 238 0 932 90 0 1022 0 0 0 0 0 2228
% App. Total 2.1 97.9 0 0 30.7 0 68.9 0.4 0 91.2 8.8 0 0 0 0 0
PHF .556 .908 .000 .000 .896 .676 .000 .539 .250 .578 .000 .869 .776 .000 .919 .000 .000 .000 .000 .000 .913
Passenger Vehicles 20 928 0 0 948 70 0 164 1 235 0 911 90 0 1001 0 0 0 0 0 2184
% Passenger Vehicles
Heavy Vehicles 0 13 0 0 13 0 0 0 0 0 0 16 0 0 16 0 0 0 0 0 29
% Heavy Vehicles 0 1.4 0 0 1.3 0 0 0 0 0 0 1.7 0 0 1.6 0 0 0 0 0 1.3
Buses 0 7 0 0 7 3 0 0 0 3 0 5 0 0 5 0 0 0 0 0 15
% Buses 0 0.7 0 0 0.7 4.1 0 0 0 1.3 0 0.5 0 0 0.5 0 0 0 0 0 0.7
SC 6
Innovation Pl
SC 6
Right
0
0
0
0
Thru
928
13
7
948
Left
20
0
0
20
Peds
0
0
0
0
InOut Total
1075 948 2023
16 13 29
5 7 12
1096 2064 968
Right
164
0
0
164
Thru
0
0
0
0
Left
70
0
3
73
Peds
1
0
0
1
OutTotal In
110 235 345
0 0 0
0 3 3
110 348 238
Left
0
0
0
0
Thru
911
16
5
932
Right
90
0
0
90
Peds
0
0
0
0
Out TotalIn
998 1001 1999
13 16 29
10 5 15
1021 2043 1022
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
TotalOut In
0 0 0
0 0 0
0 0 0
0 0 0
Peak Hour Begins at 14:45
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Innovation Pl @ Internal School Dr
Site Code :
Start Date : 03/03/2026
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
Interal Rd
Southbound
Interal Rd
Westbound
Innovation Pl
Northbound
Innovation Pl
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
07:00 5 0 12 0 0 7 4 0 0 0 0 0 32 0 2 0 62
07:15 0 1 27 0 0 57 7 0 0 0 0 0 49 0 2 0 143
07:30 5 0 40 1 0 44 8 0 0 0 0 0 57 5 5 0 165
07:45 10 0 21 0 0 27 4 0 0 0 0 0 41 1 4 0 108
Total 20 1 100 1 0 135 23 0 0 0 0 0 179 6 13 0 478
08:00 4 0 12 0 0 68 5 0 0 0 0 0 14 1 6 0 110
08:15 2 0 13 0 0 52 8 0 0 0 0 0 14 1 1 0 91
08:30 4 0 11 0 0 0 2 0 0 0 0 0 7 0 4 0 28
08:45 2 0 3 0 0 0 0 0 0 0 0 0 6 0 3 0 14
Total 12 0 39 0 0 120 15 0 0 0 0 0 41 2 14 0 243
14:00 2 0 7 0 0 0 2 0 0 0 0 0 5 0 0 0 16
14:15 1 0 6 0 0 1 1 0 0 0 0 0 8 2 0 0 19
14:30 9 0 20 0 0 8 5 3 0 0 0 3 20 3 0 0 71
14:45 6 0 19 0 0 50 10 0 1 0 0 0 24 1 0 0 111
Total 18 0 52 0 0 59 18 3 1 0 0 3 57 6 0 0 217
15:00 13 0 24 0 0 2 4 1 0 0 0 1 33 3 0 0 81
15:15 14 1 35 0 0 4 0 2 0 0 0 2 32 2 0 0 92
15:30 18 0 37 0 0 63 15 0 0 0 0 0 13 0 0 0 146
15:45 13 0 21 0 0 39 4 0 1 0 0 0 9 2 0 0 89
Total 58 1 117 0 0 108 23 3 1 0 0 3 87 7 0 0 408
Grand Total 108 2 308 1 0 422 79 6 2 0 0 6 364 21 27 0 1346
Apprch % 25.8 0.5 73.5 0.2 0 83.2 15.6 1.2 25 0 0 75 88.3 5.1 6.6 0
Total % 8 0.1 22.9 0.1 0 31.4 5.9 0.4 0.1 0 0 0.4 27 1.6 2 0
Passenger Vehicles 106 2 305 1 0 422 79 6 2 0 0 6 358 21 27 0 1335
% Passenger Vehicles 98.1 100 99 100 0 100 100 100 100 0 0 100 98.4 100 100 0 99.2
Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Buses 2 0 3 0 0 0 0 0 0 0 0 0 6 0 0 0 11
% Buses 1.9 0 1 0 0 0 0 0 0 0 0 0 1.6 0 0 0 0.8
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Innovation Pl @ Internal School Dr
Site Code :
Start Date : 03/03/2026
Page No : 2
Interal Rd
Innovation Pl
Interal Rd
Innovation Pl
Right
305
0
3
308
Thru
2
0
0
2
Left
106
0
2
108
Peds
1
0
0
1
InOut Total
437 414 851
0 0 0
6 5 11
443 862 419
Right
79
0
0
79
Thru
422
0
0
422
Left
0
0
0
0
Peds
6
0
0
6
OutTotal In
127 507 634
0 0 0
2 0 2
129 636 507
Left
2
0
0
2
Thru
0
0
0
0
Right
0
0
0
0
Peds
6
0
0
6
Out TotalIn
29 8 37
0 0 0
0 0 0
29 37 8
Left
358
0
6
364
Thru
21
0
0
21
Right
27
0
0
27
Peds
0
0
0
0
TotalOut In
729 406 1135
0 0 0
3 6 9
732 1144 412
03/03/2026 07:00
03/03/2026 15:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Innovation Pl @ Internal School Dr
Site Code :
Start Date : 03/03/2026
Page No : 3
Interal Rd
Southbound
Interal Rd
Westbound
Innovation Pl
Northbound
Innovation Pl
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15
07:15 0 1 27 0 28 0 57 7 0 64 0 0 0 0 0 49 0 2 0 51 143
07:30 5 0 40 1 46 0 44 8 0 52 0 0 0 0 0 57 5 5 0 67 165
07:45 10 0 21 0 31 0 27 4 0 31 0 0 0 0 0 41 1 4 0 46 108
08:00 4 0 12 0 16 0 68 5 0 73 0 0 0 0 0 14 1 6 0 21 110
Total Volume 19 1 100 1 121 0 196 24 0 220 0 0 0 0 0 161 7 17 0 185 526
% App. Total 15.7 0.8 82.6 0.8 0 89.1 10.9 0 0 0 0 0 87 3.8 9.2 0
PHF .475 .250 .625 .250 .658 .000 .721 .750 .000 .753 .000 .000 .000 .000 .000 .706 .350 .708 .000 .690 .797
Passenger Vehicles 19 1 100 1 121 0 196 24 0 220 0 0 0 0 0 157 7 17 0 181 522
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 4 4
% Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.5 0 0 0 2.2 0.8
Interal Rd
Innovation Pl
Interal Rd
Innovation Pl
Right
100
0
0
100
Thru
1
0
0
1
Left
19
0
0
19
Peds
1
0
0
1
InOut Total
181 121 302
0 0 0
4 0 4
185 306 121
Right
24
0
0
24
Thru
196
0
0
196
Left
0
0
0
0
Peds
0
0
0
0
OutTotal In
26 220 246
0 0 0
0 0 0
26 246 220
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
Out TotalIn
18 0 18
0 0 0
0 0 0
18 18 0
Left
157
0
4
161
Thru
7
0
0
7
Right
17
0
0
17
Peds
0
0
0
0
TotalOut In
296 181 477
0 0 0
0 4 4
296 481 185
Peak Hour Begins at 07:15
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Innovation Pl @ Internal School Dr
Site Code :
Start Date : 03/03/2026
Page No : 4
Interal Rd
Southbound
Interal Rd
Westbound
Innovation Pl
Northbound
Innovation Pl
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 14:45
14:45 6 0 19 0 25 0 50 10 0 60 1 0 0 0 1 24 1 0 0 25 111
15:00 13 0 24 0 37 0 2 4 1 7 0 0 0 1 1 33 3 0 0 36 81
15:15 14 1 35 0 50 0 4 0 2 6 0 0 0 2 2 32 2 0 0 34 92
15:30 18 0 37 0 55 0 63 15 0 78 0 0 0 0 0 13 0 0 0 13 146
Total Volume 51 1 115 0 167 0 119 29 3 151 1 0 0 3 4 102 6 0 0 108 430
% App. Total 30.5 0.6 68.9 0 0 78.8 19.2 2 25 0 0 75 94.4 5.6 0 0
PHF .708 .250 .777 .000 .759 .000 .472 .483 .375 .484 .250 .000 .000 .375 .500 .773 .500 .000 .000 .750 .736
Passenger Vehicles 49 1 113 0 163 0 119 29 3 151 1 0 0 3 4 102 6 0 0 108 426
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Buses 2 0 2 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
% Buses 3.9 0 1.7 0 2.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.9
Interal Rd
Innovation Pl
Interal Rd
Innovation Pl
Right
113
0
2
115
Thru
1
0
0
1
Left
49
0
2
51
Peds
0
0
0
0
InOut Total
131 163 294
0 0 0
0 4 4
131 298 167
Right
29
0
0
29
Thru
119
0
0
119
Left
0
0
0
0
Peds
3
0
0
3
OutTotal In
55 151 206
0 0 0
2 0 2
57 208 151
Left
1
0
0
1
Thru
0
0
0
0
Right
0
0
0
0
Peds
3
0
0
3
Out TotalIn
1 4 5
0 0 0
0 0 0
1 5 4
Left
102
0
0
102
Thru
6
0
0
6
Right
0
0
0
0
Peds
0
0
0
0
TotalOut In
233 108 341
0 0 0
2 0 2
235 343 108
Peak Hour Begins at 14:45
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Internal School Traffic Circle New
Site Code :
Start Date : 03/03/2026
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
Traffic Circle Access from K-
5 Pickup
Southbound
Traffic Circle Access from
Bruner Rd
Northbound
Traffic Circle Access from
Innovation Pl
Eastbound
Traffic Circle Access from 6-12
Pickup
Southeastbound
Start Time Thru Right
Hard Right
Peds Left Bear Left Thru Peds Hard Left Left Right Peds Hard Left Bear Right Hard Right
Peds Peds Int. Total
07:00 3 2 0 0 4 47 43 0 0 0 5 0 2 12 8 0 0 126
07:15 14 4 1 0 3 153 73 0 0 0 0 0 11 101 53 0 0 413
07:30 3 0 0 0 2 145 55 0 1 3 4 0 13 97 49 0 0 372
07:45 15 8 0 0 2 44 59 0 4 2 7 0 0 43 22 0 0 206
Total 35 14 1 0 11 389 230 0 5 5 16 0 26 253 132 0 0 1117
08:00 74 52 0 0 1 56 61 0 0 3 2 0 0 31 19 0 0 299
08:15 54 33 0 0 5 32 61 0 0 1 1 0 0 28 19 0 0 234
08:30 0 0 0 0 2 0 0 0 0 0 5 0 0 0 0 0 0 7
08:45 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 4
Total 128 85 0 0 8 88 124 0 0 4 10 0 0 59 38 0 0 544
14:00 0 0 0 0 2 24 22 0 0 0 2 0 0 0 0 0 0 50
14:15 0 0 0 0 2 19 24 0 1 0 1 0 0 0 0 0 0 47
14:30 25 5 0 0 5 34 37 0 3 0 8 0 1 12 5 0 0 135
14:45 65 26 12 3 10 72 74 0 0 2 5 0 3 53 26 0 0 351
Total 90 31 12 3 19 149 157 0 4 2 16 0 4 65 31 0 0 583
15:00 11 4 1 1 2 32 49 0 3 1 12 0 0 2 0 0 0 118
15:15 11 2 0 0 0 9 16 0 0 0 14 0 0 6 3 0 0 61
15:30 78 32 3 12 2 44 56 0 3 0 17 0 0 82 46 0 0 375
15:45 60 32 0 1 2 2 17 0 1 0 12 0 0 8 7 0 0 142
Total 160 70 4 14 6 87 138 0 7 1 55 0 0 98 56 0 0 696
Grand Total 413 200 17 17 44 713 649 0 16 12 97 0 30 475 257 0 0 2940
Apprch % 63.8 30.9 2.6 2.6 3.1 50.7 46.2 0 12.8 9.6 77.6 0 3.9 62.3 33.7 0 0
Total % 14 6.8 0.6 0.6 1.5 24.3 22.1 0 0.5 0.4 3.3 0 1 16.2 8.7 0 0
Passenger Vehicles 413 200 17 17 44 713 649 0 16 12 95 0 30 475 257 0 0 2938
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Buses 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 2
% Buses 0 0 0 0 0 0 0 0 0 0 2.1 0 0 0 0 0 0 0.1
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Internal School Traffic Circle New
Site Code :
Start Date : 03/03/2026
Page No : 2
Traffic Circle Access from 6-12 Pickup Traffic Circle Access from K-5 Pickup
Traffic Circle Access from Innovation Pl
Traffic Circle Access from Bruner Rd
Hard
Right
17
0
0
17
Right
200
0
0
200
Thru
413
0
0
413
Peds
17
0
0
17
InOut Total
691 647 1338
0 0 0
0 0 0
691 1338 647
Left
44
0
0
44
Bear
Left
713
0
0
713
Thru
649
0
0
649
Peds
0
0
0
0
Out TotalIn
983 1406 2389
0 0 0
2 0 2
985 2391 1406
Hard
Left
16
0
0
16
Left
12
0
0
12
Right
95
0
2
97
Peds
0
0
0
0
TotalOut In
501 123 624
0 0 0
0 2 2
501 626 125
Hard
Right
257 0 0
257
Bear
Right
475 0
0
475
HardLeft
30 0
0
30
Peds
0 0
0
0
Out
746 0
0
746
In
762 0 0
762
Total
1508 0
0
1508
03/03/2026 07:00
03/03/2026 15:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Internal School Traffic Circle New
Site Code :
Start Date : 03/03/2026
Page No : 3
Traffic Circle Access from K-
5 Pickup
Southbound
Traffic Circle Access from
Bruner Rd
Northbound
Traffic Circle Access from
Innovation Pl
Eastbound
Traffic Circle Access from 6-12
Pickup
Southeastbound
Start Time Thru Right Hard
Right
Peds App. Total Left
Bear Left
Thru Peds App. Total Hard Left
Left Right Peds App. Total Hard Left
Bear
Right
Hard
Right
Peds Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15
07:15 14 4 1 0 19 3 153 73 0 229 0 0 0 0 0 11 101 53 0 0 165 413
07:30 3 0 0 0 3 2 145 55 0 202 1 3 4 0 8 13 97 49 0 0 159 372
07:45 15 8 0 0 23 2 44 59 0 105 4 2 7 0 13 0 43 22 0 0 65 206
08:00 74 52 0 0 126 1 56 61 0 118 0 3 2 0 5 0 31 19 0 0 50 299
Total Volume 106 64 1 0 171 8 398 248 0 654 5 8 13 0 26 24 272 143 0 0 439 1290
% App. Total 62 37.4 0.6 0 1.2 60.9 37.9 0 19.2 30.8 50 0 5.5 62 32.6 0 0
PHF .358 .308 .250 .000 .339 .667 .650 .849 .000 .714 .313 .667 .464 .000 .500 .462 .673 .675 .000 .000 .665 .781
Passenger Vehicles
106 64 1 0 171 8 398 248 0 654 5 8 13 0 26 24 272 143 0 0 439 1290
% Passenger Vehicles
100 100 100 0 100 100 100 100 0 100 100 100 100 0 100 100 100 100 0 0 100 100
Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Buses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Internal School Traffic Circle New
Site Code :
Start Date : 03/03/2026
Page No : 4
Traffic Circle Access from 6-12 Pickup Traffic Circle Access from K-5 Pickup
Traffic Circle Access from Innovation Pl
Traffic Circle Access from Bruner Rd
Hard
Right
1
0
0
1
Right
64
0
0
64
Thru
106
0
0
106
Peds
0
0
0
0
InOut Total
280 171 451
0 0 0
0 0 0
280 451 171
Left
8
0
0
8
Bear
Left
398
0
0
398
Thru
248
0
0
248
Peds
0
0
0
0
Out TotalIn
391 654 1045
0 0 0
0 0 0
391 1045 654
Hard
Left
5
0
0
5
Left
8
0
0
8
Right
13
0
0
13
Peds
0
0
0
0
TotalOut In
215 26 241
0 0 0
0 0 0
215 241 26
Hard
Right
143 0 0
143
Bear
Right
272 0
0
272
HardLeft
24 0
0
24
Peds
0 0
0
0
Out
404 0
0
404
In
439 0 0
439
Total
843 0
0
843
Peak Hour Begins at 07:15
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
File Name : Internal School Traffic Circle New
Site Code :
Start Date : 03/03/2026
Page No : 5
Traffic Circle Access from K-
5 Pickup
Southbound
Traffic Circle Access from
Bruner Rd
Northbound
Traffic Circle Access from
Innovation Pl
Eastbound
Traffic Circle Access from 6-12
Pickup
Southeastbound
Start Time Thru Right Hard
Right
Peds App. Total Left
Bear Left
Thru Peds App. Total Hard Left
Left Right Peds App. Total Hard Left
Bear
Right
Hard
Right
Peds Peds App. Total Int. Total
Peak Hour Analysis From 14:00 to 15:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 14:45
14:45 65 26 12 3 106 10 72 74 0 156 0 2 5 0 7 3 53 26 0 0 82 351
15:00 11 4 1 1 17 2 32 49 0 83 3 1 12 0 16 0 2 0 0 0 2 118
15:15 11 2 0 0 13 0 9 16 0 25 0 0 14 0 14 0 6 3 0 0 9 61
15:30 78 32 3 12 125 2 44 56 0 102 3 0 17 0 20 0 82 46 0 0 128 375
Total Volume 165 64 16 16 261 14 157 195 0 366 6 3 48 0 57 3 143 75 0 0 221 905
% App. Total 63.2 24.5 6.1 6.1 3.8 42.9 53.3 0 10.5 5.3 84.2 0 1.4 64.7 33.9 0 0
PHF .529 .500 .333 .333 .522 .350 .545 .659 .000 .587 .500 .375 .706 .000 .713 .250 .436 .408 .000 .000 .432 .603
Passenger Vehicles
165 64 16 16 261 14 157 195 0 366 6 3 46 0 55 3 143 75 0 0 221 903
% Passenger Vehicles
100 100 100 100 100 100 100 100 0 100 100 100 95.8 0 96.5 100 100 100 0 0 100 99.8
Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Heavy Vehicles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Buses 0 0 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0 0 2
% Buses 0 0 0 0 0 0 0 0 0 0 0 0 4.2 0 3.5 0 0 0 0 0 0 0.2
Traffic Circle Access from 6-12 Pickup Traffic Circle Access from K-5 Pickup
Traffic Circle Access from Innovation Pl
Traffic Circle Access from Bruner Rd
Hard
Right
16
0
0
16
Right
64
0
0
64
Thru
165
0
0
165
Peds
16
0
0
16
InOut Total
201 261 462
0 0 0
0 0 0
201 462 261
Left
14
0
0
14
Bear
Left
157
0
0
157
Thru
195
0
0
195
Peds
0
0
0
0
Out TotalIn
354 366 720
0 0 0
2 0 2
356 722 366
Hard
Left
6
0
0
6
Left
3
0
0
3
Right
46
0
2
48
Peds
0
0
0
0
TotalOut In
153 55 208
0 0 0
0 2 2
153 210 57
Hard
Right
75 0 0
75
Bear
Right
143 0 0
143
HardLeft
3 0
0 3 Peds
0 0 0 0 Out
179 0 0
179
In
221 0 0
221
Total400 0
0
400
Peak Hour Begins at 14:45
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
Site Name 32-0711 Site ID 000000320711 Description S-132 : SC 6 (S LAKE DR) TO S- 337 (SWARTZ RD)
Data Item 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Data Item
Statistics Type - - - - - - - - - - Statistics Type
AADT 1300 1200 1350 1500 1500 1500 1450 1250 1250 1550 AADT
SU AADT 23 21 24 39 50 39 38 56 56 94 SU AADT
CU AADT 18 17 19 9 30 9 9 1 1 6 CU AADT
Single-Unit % DHV - - - - - - - - - - Single-Unit % DHV
Combo-Unit % DHV - - - - - - - - - - Combo-Unit % DHV
Single-Unit % Peak - - - - - - - - - - Single-Unit % Peak
Combo-Unit % Peak - - - - - - - - - - Combo-Unit % Peak
K-Factor 0.09 0.09 0.09 0.11 0.11 0.11 0.11 0.11 0.11 0.1 K-Factor
D-Factor 0.51 0.51 0.51 0.76 0.76 0.76 0.76 0.55 0.55 0.74 D-Factor
Future AADT - - - - - - - - - - Future AADT
-7.69% 12.50% 11.11% 0.00% 0.00% -3.33% -13.79% 0.00% 24.00% 2.53% 39.25352
Site Name 32-0467 Site ID 000000320467 Description S-626 : S- 1448 (ZENKER RD) TO SC 6 (S LAKE DR)
Data Item 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Data Item
Statistics Type - - - - - - - - - - Statistics Type
AADT 8700 8400 8800 9500 9300 7400 7200 8200 8100 9500 AADT
SU AADT - - - - 242 838 816 623 616 786 SU AADT
CU AADT - - - - 307 222 216 221 219 234 CU AADT
Single-Unit % DHV - - - - - - - - - - Single-Unit % DHV
Combo-Unit % DHV - - - - - - - - - - Combo-Unit % DHV
Single-Unit % Peak - - - - - - - - - - Single-Unit % Peak
Combo-Unit % Peak - - - - - - - - - - Combo-Unit % Peak
K-Factor - - - - - 0.1 0.1 0.1 0.1 0.11 K-Factor
D-Factor - - - - - 0.52 0.52 0.55 0.55 0.63 D-Factor
Future AADT - - - - - - - - - - Future AADT
-3.45% 4.76% 7.95% -2.11% -20.43% -2.70% 13.89% -1.22% 17.28% 1.55% 147.6029
Site Name 32-0219 Site ID 000000320219 Description SC6 : L- 1657 (MAIDEN LN) TO I- 20 (INTERSTATE 20)
Data Item 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Data Item
Statistics Type - - - - - - - - - - Statistics Type
AADT 21900 20500 20400 21200 21600 20800 21700 22600 23800 23100 AADT
SU AADT - - - - 605 688 718 748 788 984 SU AADT
CU AADT - - - - 1058 96 100 104 109 109 CU AADT
Single-Unit % DHV - - - - - - - - - - Single-Unit % DHV
Combo-Unit % DHV - - - - - - - - - - Combo-Unit % DHV
Single-Unit % Peak - - - - - - - - - - Single-Unit % Peak
Combo-Unit % Peak - - - - - - - - - - Combo-Unit % Peak
K-Factor - - - - - 0.1 0.1 0.1 0.1 0.09 K-Factor
D-Factor - - - - - 0.5 0.5 0.5 0.5 0.52 D-Factor
Future AADT - - - - - - - - - - Future AADT
-6.39% -0.49% 3.92% 1.89% -3.70% 4.33% 4.15% 5.31% -2.94% 0.67% 155.7224
Site Name 32-0693 Site ID 000000320693 Description S-337 : US 1 (E MAIN ST) TO SC 6 (S LAKE DR)
Data Item 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Data Item
Statistics Type - - - - - - - - - - Statistics Type
AADT 2200 2200 2600 2600 2600 2800 2700 2500 2500 3500 AADT
SU AADT 47 47 55 42 86 73 71 74 74 126 SU AADT
CU AADT 40 40 47 2 52 1 1 1 1 3 CU AADT
Single-Unit % DHV - - - - - - - - - - Single-Unit % DHV
Combo-Unit % DHV - - - - - - - - - - Combo-Unit % DHV
Single-Unit % Peak - - - - - - - - - - Single-Unit % Peak
Combo-Unit % Peak - - - - - - - - - - Combo-Unit % Peak
K-Factor 0.15 0.15 0.15 0.14 0.14 0.13 0.13 0.14 0.14 0.14 K-Factor
D-Factor 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.71 0.71 0.56 D-Factor
Future AADT - - - - - - - - - - Future AADT
0.00% 18.18% 0.00% 0.00% 7.69% -3.57% -7.41% 0.00% 40.00% 6.10% 213.4817
Weighted Average: 1.48%
Existing Analysis Year: 2026
Build Analysis Year: 2028
Growth Factor: 1.0298
Single Station Annualized Statistics - SCDOT_PORTABLES 000000320219
Single Station Annualized Statistics - SCDOT_PORTABLES 000000320693
Single Station Annualized Statistics - SCDOT_PORTABLES 000000320711
Single Station Annualized Statistics - SCDOT_PORTABLES 000000320467
LUC 538 Charter School
Students Kids/Car In Rate Multiplier Rate % In % Out Total Trips Trips In Trips Out
AM-ITE 12th Edition (Site Generated New Trips) 926 2.25 1 0.84 53% 47% 778 412 366
AM-Actual (7-8 AM Existing Trips) 1674 1.96 1.000 0.84 61% 39% 1406 853 553 The actual number of students was used to calculate Kids/Cars in for AM using the IN/OUT actual splits observed
AM-Actual Rate Extrapolated (Site Generated New Trips) 926 1.96 1.146 0.963 61% 39% 891 544 348 The kids/car IN rate from the above line was entered to calculate the ITE rate Multiplier. The rate multiplier was plugged in to the PM rate below.
PM-ITE (Site Generated New Trips) 926 3.33 1 0.6 50% 50% 556 278 278
PM-Actual (230-330 In, 245-345 Out PM) 1674 3.89 1.070 0.64 40% 60% 1075 430 645
PM-Rate from AM rate multiplier calculated above (Site Generated New Trips) 926 3.64 1.146 0.688 40% 60% 637 255 382
AM-SC 6 at Innovation Actual 3-2026 (7-8 AM) 197 235
AM-Bruner at School Access Actual 3-2026 (7-8 AM) 656 318
AM-Total Actual 3-2026 853 553
PM-SC 6 at Innovation Actual 3-2026 (230-330 In, 245-345 Out PM) 122 237
PM-Bruner at School Access Actual 3-2026 (230-330 In, 245-345 Out PM) 308 408
PM-Total Actual 3-2026 430 645
Appendix C Intersection Reports
Timings AM 2026 Existing
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 124 341 337 115 223 853 403 129 573
Future Volume (vph) 124 341 337 115 223 853 403 129 573
Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Detector Phase 8 1 4 4 1 6 4 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0
Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Recall Mode None None None None None Min None None Min
Act Effct Green (s) 16.0 34.7 16.1 16.1 37.8 29.3 51.5 37.8 25.3
Actuated g/C Ratio 0.17 0.37 0.17 0.17 0.40 0.31 0.55 0.40 0.27
v/c Ratio 0.78 0.59 0.64 0.54 0.72 0.86 0.44 0.60 0.72
Control Delay 56.9 22.3 42.7 40.6 30.2 40.5 4.1 27.8 36.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 56.9 22.3 42.7 40.6 30.2 40.5 4.1 27.8 36.9
LOS E C D D C D A C D
Approach Delay 35.8 42.1 29.0 35.3
Approach LOS D D C D
Intersection Summary
Cycle Length: 101
Actuated Cycle Length: 94.3
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.86
Intersection Signal Delay: 33.6 Intersection LOS: C
Intersection Capacity Utilization 72.1% ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd
Phasings AM 2026 Existing
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0
Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7%
Maximum Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recall Mode None None None None None Min None None Min
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
90th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
90th %ile Term Code Max Max Max Max Max Max Max Max Max
70th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
70th %ile Term Code Max Max Max Max Max Max Max Max Max
50th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
50th %ile Term Code Max Max Max Max Max Max Max Max Hold
30th %ile Green (s) 15.7 12.1 15.7 15.7 12.1 29.4 15.7 8.7 26.0
30th %ile Term Code Gap Gap Gap Gap Gap Gap Gap Gap Hold
10th %ile Green (s) 11.1 9.0 11.4 11.4 9.0 21.7 11.4 6.8 19.5
10th %ile Term Code Gap Gap Gap Gap Gap Gap Gap Gap Hold
Intersection Summary
Cycle Length: 101
Actuated Cycle Length: 94.3
Control Type: Actuated-Uncoordinated
90th %ile Actuated Cycle: 101
70th %ile Actuated Cycle: 101
50th %ile Actuated Cycle: 101
30th %ile Actuated Cycle: 93.5
10th %ile Actuated Cycle: 75
Queues AM 2026 Existing
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Group Flow (vph) 242 379 374 172 248 948 448 143 683
v/c Ratio 0.78 0.59 0.64 0.54 0.72 0.86 0.44 0.60 0.72
Control Delay 56.9 22.3 42.7 40.6 30.2 40.5 4.1 27.8 36.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 56.9 22.3 42.7 40.6 30.2 40.5 4.1 27.8 36.9
Queue Length 50th (ft) 149 141 115 92 96 298 26 52 208
Queue Length 95th (ft) #261 238 164 160 #173 #382 76 95 274
Internal Link Dist (ft) 665 963 493 629
Turn Bay Length (ft) 325 200 300 200
Base Capacity (vph) 353 669 663 358 376 1217 1055 250 1021
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.69 0.57 0.56 0.48 0.66 0.78 0.42 0.57 0.67
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary AM 2026 Existing
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 94 124 341 337 115 40 223 853 403 129 573 41
Future Volume (veh/h) 94 124 341 337 115 40 223 853 403 129 573 41
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 104 138 379 374 128 44 248 948 448 143 637 46
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 157 209 511 486 187 64 374 1134 729 239 909 66
Arrive On Green 0.20 0.20 0.20 0.14 0.14 0.14 0.12 0.32 0.32 0.07 0.27 0.27
Sat Flow, veh/h 787 1044 1585 3456 1331 457 1781 3554 1585 1781 3361 242
Grp Volume(v), veh/h 242 0 379 374 0 172 248 948 448 143 336 347
Grp Sat Flow(s),veh/h/ln 1831 0 1585 1728 0 1788 1781 1777 1585 1781 1777 1827
Q Serve(g_s), s 11.0 0.0 18.0 9.4 0.0 8.2 8.8 22.3 19.2 4.8 15.3 15.4
Cycle Q Clear(g_c), s 11.0 0.0 18.0 9.4 0.0 8.2 8.8 22.3 19.2 4.8 15.3 15.4
Prop In Lane 0.43 1.00 1.00 0.26 1.00 1.00 1.00 0.13
Lane Grp Cap(c), veh/h 366 0 511 486 0 252 374 1134 729 239 481 494
V/C Ratio(X) 0.66 0.00 0.74 0.77 0.00 0.68 0.66 0.84 0.61 0.60 0.70 0.70
Avail Cap(c_a), veh/h 366 0 511 691 0 357 432 1263 786 286 533 548
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 33.2 0.0 27.2 37.3 0.0 36.8 21.2 28.5 18.3 22.0 29.6 29.6
Incr Delay (d2), s/veh 4.4 0.0 5.7 3.4 0.0 3.3 3.1 4.6 1.3 2.4 3.6 3.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.0 0.0 7.5 4.0 0.0 3.6 3.7 9.4 8.7 2.0 6.6 6.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 37.6 0.0 32.9 40.6 0.0 40.0 24.3 33.1 19.6 24.4 33.2 33.1
LnGrp LOS D A C D A D C C B C C C
Approach Vol, veh/h 621 546 1644 826
Approach Delay, s/veh 34.7 40.4 28.1 31.6
Approach LOS C D C C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 17.0 30.4 18.7 12.7 34.7 24.0
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 14.0 27.0 18.0 9.0 32.0 18.0
Max Q Clear Time (g_c+I1), s 10.8 17.4 11.4 6.8 24.3 20.0
Green Ext Time (p_c), s 0.2 2.7 1.3 0.1 4.4 0.0
Intersection Summary
HCM 6th Ctrl Delay 31.9
HCM 6th LOS C
HCM 6th TWSC AM 2026 Existing
6: Glassmaster Rd & Bruner Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 4.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 537 73 99 305 44 104
Future Vol, veh/h 537 73 99 305 44 104
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 597 81 110 339 49 116
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 678 0 1197 638
Stage 1 - - - - 638 -
Stage 2 - - - - 559 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 914 - 205 477
Stage 1 - - - - 526 -
Stage 2 - - - - 572 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 914 - 175 477
Mov Cap-2 Maneuver - - - - 175 -
Stage 1 - - - - 526 -
Stage 2 - - - - 487 -
Approach EB WB NB
HCM Control Delay, s 0 2.3 28.3
HCM LOS D
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 315 - - 914 -
HCM Lane V/C Ratio 0.522 - - 0.12 -
HCM Control Delay (s) 28.3 - - 9.5 0
HCM Lane LOS D - - A A
HCM 95th %tile Q(veh) 2.8 - - 0.4 -
HCM 6th TWSC AM 2026 Existing
9: Bruner Rd & School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 217.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 573 114 18 94 133 266
Future Vol, veh/h 573 114 18 94 133 266
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 637 127 20 104 148 296
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 124 0 - 0 1473 72
Stage 1 - - - - 72 -
Stage 2 - - - - 1401 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1463 - - - ~ 140 990
Stage 1 - - - - 951 -
Stage 2 - - - - 228 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1463 - - - ~ 74 990
Mov Cap-2 Maneuver - - - - ~ 74 -
Stage 1 - - - - 506 -
Stage 2 - - - - 228 -
Approach EB WB SB
HCM Control Delay, s 7.8 0 $ 638.7
HCM LOS F
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1463 - - - 193
HCM Lane V/C Ratio 0.435 - - - 2.297
HCM Control Delay (s) 9.3 0 - -$ 638.7
HCM Lane LOS A A - - F
HCM 95th %tile Q(veh) 2.3 - - - 35.9
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th TWSC AM 2026 Existing
10: SC 6 & Innovation Pl
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 3.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 75 202 956 96 55 716
Future Vol, veh/h 75 202 956 96 55 716
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 100 - - 25 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 83 224 1062 107 61 796
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1636 585 0 0 1169 0
Stage 1 1116 - - - - -
Stage 2 520 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 92 454 - - 593 -
Stage 1 275 - - - - -
Stage 2 561 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 83 454 - - 593 -
Mov Cap-2 Maneuver 196 - - - - -
Stage 1 275 - - - - -
Stage 2 503 - - - - -
Approach WB NB SB
HCM Control Delay, s 24.7 0 0.8
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 196 454 593 -
HCM Lane V/C Ratio - - 0.425 0.494 0.103 -
HCM Control Delay (s) - - 36.3 20.4 11.8 -
HCM Lane LOS - - E C B -
HCM 95th %tile Q(veh) - - 1.9 2.7 0.3 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Roundabout AM 2026 Existing
11: School Access/6-12 & Innov.Pl Connector/K-5
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Intersection Delay, s/veh 8.3
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1 1 1 1
Conflicting Circle Lanes 1 1 1 1
Adj Approach Flow, veh/h 29 190 727 488
Demand Flow Rate, veh/h 29 193 742 498
Vehicles Circulating, veh/h 456 466 43 201
Vehicles Exiting, veh/h 243 319 442 458
Ped Vol Crossing Leg, #/h 0 0 0 0
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 4.5 6.6 9.1 8.1
Approach LOS A A A A
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 29 193 742 498
Cap Entry Lane, veh/h 867 858 1321 1124
Entry HV Adj Factor 0.994 0.982 0.980 0.980
Flow Entry, veh/h 29 190 727 488
Cap Entry, veh/h 861 843 1294 1101
V/C Ratio 0.033 0.225 0.562 0.443
Control Delay, s/veh 4.5 6.6 9.1 8.1
LOS A A A A
95th %tile Queue, veh 0 1 4 2
HCM 6th TWSC AM 2026 Existing
12: Innovation Pl & Innov.Pl Connector & Internal School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 5.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 161 7 17 0 196 24 0 0 0 19 1 100
Future Vol, veh/h 161 7 17 0 196 24 0 0 0 19 1 100
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 179 8 19 0 218 27 0 0 0 21 1 111
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 245 0 0 27 0 0 664 621 18 608 617 232
Stage 1 - - - - - - 376 376 - 232 232 -
Stage 2 - - - - - - 288 245 - 376 385 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1321 - - 1587 - - 374 403 1061 408 405 807
Stage 1 - - - - - - 645 616 - 771 713 -
Stage 2 - - - - - - 720 703 - 645 611 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1321 - - 1587 - - 288 347 1061 365 349 807
Mov Cap-2 Maneuver - - - - - - 288 347 - 365 349 -
Stage 1 - - - - - - 556 531 - 665 713 -
Stage 2 - - - - - - 620 703 - 556 527 -
Approach EB WB NB SB
HCM Control Delay, s 7.1 0 0 11.7
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1321 - - 1587 - - 671
HCM Lane V/C Ratio - 0.135 - - - - - 0.199
HCM Control Delay (s) 0 8.2 0 - 0 - - 11.7
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0.5 - - 0 - - 0.7
Timings AM 2028 Background
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 128 351 347 118 230 878 415 133 590
Future Volume (vph) 128 351 347 118 230 878 415 133 590
Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Detector Phase 8 1 4 4 1 6 4 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0
Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Recall Mode None None None None None Min None None Min
Act Effct Green (s) 16.3 35.2 16.3 16.3 38.5 29.9 52.3 38.5 25.7
Actuated g/C Ratio 0.17 0.37 0.17 0.17 0.40 0.31 0.55 0.40 0.27
v/c Ratio 0.80 0.60 0.66 0.56 0.75 0.88 0.45 0.62 0.74
Control Delay 59.0 23.0 43.6 41.5 33.2 42.1 4.7 29.5 37.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 59.0 23.0 43.6 41.5 33.2 42.1 4.7 29.5 37.7
LOS E C D D C D A C D
Approach Delay 37.0 42.9 30.6 36.2
Approach LOS D D C D
Intersection Summary
Cycle Length: 101
Actuated Cycle Length: 95.4
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay: 34.8 Intersection LOS: C
Intersection Capacity Utilization 73.6% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd
Phasings AM 2028 Background
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0
Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7%
Maximum Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recall Mode None None None None None Min None None Min
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
90th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
90th %ile Term Code Max Max Max Max Max Max Max Max Max
70th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
70th %ile Term Code Max Max Max Max Max Max Max Max Max
50th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
50th %ile Term Code Max Max Max Max Max Max Max Max Hold
30th %ile Green (s) 16.5 12.7 16.2 16.2 12.7 31.0 16.2 9.0 27.3
30th %ile Term Code Gap Gap Gap Gap Gap Gap Gap Max Hold
10th %ile Green (s) 11.7 9.5 11.8 11.8 9.5 22.9 11.8 7.0 20.4
10th %ile Term Code Gap Gap Gap Gap Gap Gap Gap Gap Hold
Intersection Summary
Cycle Length: 101
Actuated Cycle Length: 95.4
Control Type: Actuated-Uncoordinated
90th %ile Actuated Cycle: 101
70th %ile Actuated Cycle: 101
50th %ile Actuated Cycle: 101
30th %ile Actuated Cycle: 96.7
10th %ile Actuated Cycle: 77.4
Queues AM 2028 Background
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Group Flow (vph) 250 390 386 177 256 976 461 148 703
v/c Ratio 0.80 0.60 0.66 0.56 0.75 0.88 0.45 0.62 0.74
Control Delay 59.0 23.0 43.6 41.5 33.2 42.1 4.7 29.5 37.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 59.0 23.0 43.6 41.5 33.2 42.1 4.7 29.5 37.7
Queue Length 50th (ft) 155 148 120 96 100 310 34 54 216
Queue Length 95th (ft) #273 248 169 165 #194 #421 91 #103 283
Internal Link Dist (ft) 665 963 493 629
Turn Bay Length (ft) 325 200 300 200
Base Capacity (vph) 348 666 654 353 366 1199 1047 246 1009
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.72 0.59 0.59 0.50 0.70 0.81 0.44 0.60 0.70
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary AM 2028 Background
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 97 128 351 347 118 41 230 878 415 133 590 42
Future Volume (veh/h) 97 128 351 347 118 41 230 878 415 133 590 42
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 108 142 390 386 131 46 256 976 461 148 656 47
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 156 205 510 496 190 67 373 1145 738 237 917 66
Arrive On Green 0.20 0.20 0.20 0.14 0.14 0.14 0.12 0.32 0.32 0.08 0.27 0.27
Sat Flow, veh/h 791 1040 1585 3456 1322 464 1781 3554 1585 1781 3363 241
Grp Volume(v), veh/h 250 0 390 386 0 177 256 976 461 148 346 357
Grp Sat Flow(s),veh/h/ln 1831 0 1585 1728 0 1787 1781 1777 1585 1781 1777 1827
Q Serve(g_s), s 11.6 0.0 18.0 9.9 0.0 8.6 9.3 23.5 20.1 5.0 16.1 16.1
Cycle Q Clear(g_c), s 11.6 0.0 18.0 9.9 0.0 8.6 9.3 23.5 20.1 5.0 16.1 16.1
Prop In Lane 0.43 1.00 1.00 0.26 1.00 1.00 1.00 0.13
Lane Grp Cap(c), veh/h 360 0 510 496 0 256 373 1145 738 237 484 498
V/C Ratio(X) 0.69 0.00 0.77 0.78 0.00 0.69 0.69 0.85 0.62 0.62 0.71 0.72
Avail Cap(c_a), veh/h 360 0 510 680 0 351 423 1243 782 278 524 539
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 34.2 0.0 27.9 37.8 0.0 37.3 21.6 29.0 18.4 22.4 30.1 30.1
Incr Delay (d2), s/veh 5.7 0.0 6.8 4.0 0.0 3.4 3.9 5.6 1.4 3.3 4.2 4.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.4 0.0 8.0 4.2 0.0 3.8 3.9 10.1 9.2 2.1 7.0 7.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 39.9 0.0 34.7 41.7 0.0 40.6 25.5 34.5 19.9 25.6 34.3 34.2
LnGrp LOS D A C D A D C C B C C C
Approach Vol, veh/h 640 563 1693 851
Approach Delay, s/veh 36.7 41.4 29.2 32.8
Approach LOS D D C C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 17.4 30.9 19.1 12.9 35.5 24.0
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 14.0 27.0 18.0 9.0 32.0 18.0
Max Q Clear Time (g_c+I1), s 11.3 18.1 11.9 7.0 25.5 20.0
Green Ext Time (p_c), s 0.2 2.6 1.3 0.1 4.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 33.1
HCM 6th LOS C
HCM 6th TWSC AM 2028 Background
6: Glassmaster Rd & Bruner Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 1.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 553 75 20 410 45 20
Future Vol, veh/h 553 75 20 410 45 20
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 614 83 22 456 50 22
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 697 0 1156 656
Stage 1 - - - - 656 -
Stage 2 - - - - 500 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 899 - 217 465
Stage 1 - - - - 516 -
Stage 2 - - - - 609 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 899 - 210 465
Mov Cap-2 Maneuver - - - - 210 -
Stage 1 - - - - 516 -
Stage 2 - - - - 589 -
Approach EB WB NB
HCM Control Delay, s 0 0.4 24.8
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 253 - - 899 -
HCM Lane V/C Ratio 0.285 - - 0.025 -
HCM Control Delay (s) 24.8 - - 9.1 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 1.1 - - 0.1 -
HCM 6th TWSC AM 2028 Background
9: Bruner Rd & School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 9.3
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 590 20 19 0 0 411
Future Vol, veh/h 590 20 19 0 0 411
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 656 22 21 0 0 457
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 21 0 - 0 1355 21
Stage 1 - - - - 21 -
Stage 2 - - - - 1334 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1595 - - - 165 1056
Stage 1 - - - - 1002 -
Stage 2 - - - - 246 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1595 - - - 96 1056
Mov Cap-2 Maneuver - - - - 96 -
Stage 1 - - - - 585 -
Stage 2 - - - - 246 -
Approach EB WB SB
HCM Control Delay, s 8.5 0 11
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1595 - - - 1056
HCM Lane V/C Ratio 0.411 - - - 0.432
HCM Control Delay (s) 8.8 0 - - 11
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 2.1 - - - 2.2
HCM 6th TWSC AM 2028 Background
10: SC 6 & Innovation Pl
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 3.8
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 77 208 985 99 57 737
Future Vol, veh/h 77 208 985 99 57 737
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 100 - - 25 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 86 231 1094 110 63 819
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1685 602 0 0 1204 0
Stage 1 1149 - - - - -
Stage 2 536 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver ~ 85 443 - - 575 -
Stage 1 264 - - - - -
Stage 2 551 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 76 443 - - 575 -
Mov Cap-2 Maneuver 187 - - - - -
Stage 1 264 - - - - -
Stage 2 490 - - - - -
Approach WB NB SB
HCM Control Delay, s 26.5 0 0.9
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 187 443 575 -
HCM Lane V/C Ratio - - 0.458 0.522 0.11 -
HCM Control Delay (s) - - 39.5 21.7 12 -
HCM Lane LOS - - E C B -
HCM 95th %tile Q(veh) - - 2.2 2.9 0.4 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Roundabout AM 2028 Background
11: School Access/6-12 & Innov.Pl Connector/K-5
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Intersection Delay, s/veh 8.3
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1 1 1 1
Conflicting Circle Lanes 1 1 1 1
Adj Approach Flow, veh/h 29 190 727 488
Demand Flow Rate, veh/h 29 193 742 498
Vehicles Circulating, veh/h 456 466 43 201
Vehicles Exiting, veh/h 243 319 442 458
Ped Vol Crossing Leg, #/h 0 0 0 0
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 4.5 6.6 9.1 8.1
Approach LOS A A A A
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 29 193 742 498
Cap Entry Lane, veh/h 867 858 1321 1124
Entry HV Adj Factor 0.994 0.982 0.980 0.980
Flow Entry, veh/h 29 190 727 488
Cap Entry, veh/h 861 843 1294 1101
V/C Ratio 0.033 0.225 0.562 0.443
Control Delay, s/veh 4.5 6.6 9.1 8.1
LOS A A A A
95th %tile Queue, veh 0 1 4 2
HCM 6th TWSC AM 2028 Background
12: Innovation Pl & Innov.Pl Connector & Internal School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 5.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 161 7 17 0 196 24 0 0 0 19 1 100
Future Vol, veh/h 161 7 17 0 196 24 0 0 0 19 1 100
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 179 8 19 0 218 27 0 0 0 21 1 111
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 245 0 0 27 0 0 664 621 18 608 617 232
Stage 1 - - - - - - 376 376 - 232 232 -
Stage 2 - - - - - - 288 245 - 376 385 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1321 - - 1587 - - 374 403 1061 408 405 807
Stage 1 - - - - - - 645 616 - 771 713 -
Stage 2 - - - - - - 720 703 - 645 611 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1321 - - 1587 - - 288 347 1061 365 349 807
Mov Cap-2 Maneuver - - - - - - 288 347 - 365 349 -
Stage 1 - - - - - - 556 531 - 665 713 -
Stage 2 - - - - - - 620 703 - 556 527 -
Approach EB WB NB SB
HCM Control Delay, s 7.1 0 0 11.7
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1321 - - 1587 - - 671
HCM Lane V/C Ratio - 0.135 - - - - - 0.199
HCM Control Delay (s) 0 8.2 0 - 0 - - 11.7
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0.5 - - 0 - - 0.7
Timings AM 2028 Build
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 215 351 486 167 230 938 665 232 614
Future Volume (vph) 215 351 486 167 230 938 665 232 614
Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Detector Phase 8 1 4 4 1 6 4 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0
Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Recall Mode None None None None None Min None None Min
Act Effct Green (s) 18.0 37.2 18.0 18.0 40.7 31.7 55.7 40.7 27.5
Actuated g/C Ratio 0.18 0.37 0.18 0.18 0.40 0.31 0.55 0.40 0.27
v/c Ratio 1.08 0.60 0.88 0.76 0.79 0.94 0.78 1.11 0.77
Control Delay 112.3 23.4 57.7 53.1 38.7 49.6 21.1 117.9 39.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 112.3 23.4 57.7 53.1 38.7 49.6 21.1 117.9 39.6
LOS F C E D D D C F D
Approach Delay 65.6 56.2 37.9 59.9
Approach LOS E E D E
Intersection Summary
Cycle Length: 101
Actuated Cycle Length: 100.7
Natural Cycle: 100
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 1.11
Intersection Signal Delay: 50.4 Intersection LOS: D
Intersection Capacity Utilization 89.6% ICU Level of Service E
Analysis Period (min) 15
Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd
Phasings AM 2028 Build
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 20.0 24.0 24.0 20.0 38.0 24.0 15.0 33.0
Total Split (%) 23.8% 19.8% 23.8% 23.8% 19.8% 37.6% 23.8% 14.9% 32.7%
Maximum Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recall Mode None None None None None Min None None Min
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
90th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
90th %ile Term Code Max Max Max Max Max Max Max Max Max
70th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
70th %ile Term Code Max Max Max Max Max Max Max Max Max
50th %ile Green (s) 18.0 14.0 18.0 18.0 14.0 32.0 18.0 9.0 27.0
50th %ile Term Code Max Max Max Max Max Max Max Max Hold
30th %ile Green (s) 18.0 13.3 18.0 18.0 13.3 32.0 18.0 9.0 27.7
30th %ile Term Code Max Gap Max Max Gap Max Max Max Hold
10th %ile Green (s) 18.0 10.6 18.0 18.0 10.6 30.5 18.0 9.0 28.9
10th %ile Term Code Max Gap Max Max Gap Gap Max Max Hold
Intersection Summary
Cycle Length: 101
Actuated Cycle Length: 100.7
Control Type: Actuated-Uncoordinated
90th %ile Actuated Cycle: 101
70th %ile Actuated Cycle: 101
50th %ile Actuated Cycle: 101
30th %ile Actuated Cycle: 101
10th %ile Actuated Cycle: 99.5
Queues AM 2028 Build
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Group Flow (vph) 352 390 540 253 256 1042 739 258 736
v/c Ratio 1.08 0.60 0.88 0.76 0.79 0.94 0.78 1.11 0.77
Control Delay 112.3 23.4 57.7 53.1 38.7 49.6 21.1 117.9 39.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 112.3 23.4 57.7 53.1 38.7 49.6 21.1 117.9 39.6
Queue Length 50th (ft) ~254 148 176 147 100 340 287 ~140 228
Queue Length 95th (ft) #430 248 #267 #264 #212 #470 462 #299 298
Internal Link Dist (ft) 665 963 493 629
Turn Bay Length (ft) 325 200 300 200
Base Capacity (vph) 327 658 613 332 338 1124 942 232 962
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.08 0.59 0.88 0.76 0.76 0.93 0.78 1.11 0.77
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary AM 2028 Build
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 102 215 351 486 167 60 230 938 665 232 614 49
Future Volume (veh/h) 102 215 351 486 167 60 230 938 665 232 614 49
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 113 239 390 540 186 67 256 1042 739 258 682 54
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 106 224 475 606 230 83 361 1130 782 240 956 76
Arrive On Green 0.18 0.18 0.18 0.18 0.18 0.18 0.12 0.32 0.32 0.09 0.29 0.29
Sat Flow, veh/h 591 1250 1585 3456 1312 473 1781 3554 1585 1781 3336 264
Grp Volume(v), veh/h 352 0 390 540 0 253 256 1042 739 258 363 373
Grp Sat Flow(s),veh/h/ln 1841 0 1585 1728 0 1785 1781 1777 1585 1781 1777 1823
Q Serve(g_s), s 18.0 0.0 18.0 15.4 0.0 13.7 10.0 28.5 32.0 9.0 18.4 18.5
Cycle Q Clear(g_c), s 18.0 0.0 18.0 15.4 0.0 13.7 10.0 28.5 32.0 9.0 18.4 18.5
Prop In Lane 0.32 1.00 1.00 0.26 1.00 1.00 1.00 0.14
Lane Grp Cap(c), veh/h 329 0 475 606 0 313 361 1130 782 240 509 523
V/C Ratio(X) 1.07 0.00 0.82 0.89 0.00 0.81 0.71 0.92 0.95 1.07 0.71 0.71
Avail Cap(c_a), veh/h 329 0 475 618 0 319 394 1130 782 240 509 523
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 41.3 0.0 32.7 40.6 0.0 39.9 23.3 33.1 21.0 26.0 32.2 32.2
Incr Delay (d2), s/veh 69.1 0.0 11.0 15.0 0.0 14.1 5.3 12.3 20.0 79.1 4.6 4.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 14.1 0.0 9.7 7.5 0.0 7.0 4.4 13.3 22.4 8.9 8.1 8.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 110.4 0.0 43.8 55.6 0.0 54.0 28.5 45.4 41.1 105.2 36.8 36.8
LnGrp LOS F A D E A D C D D F D D
Approach Vol, veh/h 742 793 2037 994
Approach Delay, s/veh 75.4 55.1 41.7 54.5
Approach LOS E E D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 18.1 34.9 23.6 15.0 38.0 24.0
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 14.0 27.0 18.0 9.0 32.0 18.0
Max Q Clear Time (g_c+I1), s 12.0 20.5 17.4 11.0 34.0 20.0
Green Ext Time (p_c), s 0.1 2.2 0.3 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 52.3
HCM 6th LOS D
HCM 6th TWSC AM 2028 Build
6: Glassmaster Rd & Bruner Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 6.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 983 82 27 612 50 25
Future Vol, veh/h 983 82 27 612 50 25
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1092 91 30 680 56 28
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 1183 0 1878 1138
Stage 1 - - - - 1138 -
Stage 2 - - - - 740 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 590 - 78 245
Stage 1 - - - - 306 -
Stage 2 - - - - 472 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 590 - 72 245
Mov Cap-2 Maneuver - - - - 72 -
Stage 1 - - - - 306 -
Stage 2 - - - - 433 -
Approach EB WB NB
HCM Control Delay, s 0 0.5 144
HCM LOS F
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 94 - - 590 -
HCM Lane V/C Ratio 0.887 - - 0.051 -
HCM Control Delay (s) 144 - - 11.4 0
HCM Lane LOS F - - B A
HCM 95th %tile Q(veh) 5 - - 0.2 -
HCM 6th TWSC AM 2028 Build
9: Bruner Rd & School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 13.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 1025 20 19 0 0 620
Future Vol, veh/h 1025 20 19 0 0 620
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1139 22 21 0 0 689
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 21 0 - 0 2321 21
Stage 1 - - - - 21 -
Stage 2 - - - - 2300 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1595 - - - 41 1056
Stage 1 - - - - 1002 -
Stage 2 - - - - 81 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1595 - - - 11 1056
Mov Cap-2 Maneuver - - - - 11 -
Stage 1 - - - - 278 -
Stage 2 - - - - 81 -
Approach EB WB SB
HCM Control Delay, s 12.4 0 14.6
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1595 - - - 1056
HCM Lane V/C Ratio 0.714 - - - 0.652
HCM Control Delay (s) 12.7 0 - - 14.6
HCM Lane LOS B A - - B
HCM 95th %tile Q(veh) 6.7 - - - 5.1
HCM 6th TWSC AM 2028 Build
10: SC 6 & Innovation Pl
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 10
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 115 309 999 170 95 829
Future Vol, veh/h 115 309 999 170 95 829
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 100 - - 25 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 128 343 1110 189 106 921
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1878 650 0 0 1299 0
Stage 1 1205 - - - - -
Stage 2 673 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver ~ 63 412 - - 529 -
Stage 1 247 - - - - -
Stage 2 468 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 50 412 - - 529 -
Mov Cap-2 Maneuver 157 - - - - -
Stage 1 247 - - - - -
Stage 2 374 - - - - -
Approach WB NB SB
HCM Control Delay, s 56.1 0 1.4
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 157 412 529 -
HCM Lane V/C Ratio - - 0.814 0.833 0.2 -
HCM Control Delay (s) - - 86.8 44.7 13.5 -
HCM Lane LOS - - F E B -
HCM 95th %tile Q(veh) - - 5.3 7.8 0.7 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Roundabout AM 2028 Build
11: School Access/6-12 & Innov.Pl Connector/K-5
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Intersection Delay, s/veh 20.6
Intersection LOS C
Approach EB WB NB SB
Entry Lanes 1 1 1 1
Conflicting Circle Lanes 1 1 1 1
Adj Approach Flow, veh/h 45 289 1139 739
Demand Flow Rate, veh/h 45 295 1162 754
Vehicles Circulating, veh/h 723 723 65 302
Vehicles Exiting, veh/h 333 504 703 716
Ped Vol Crossing Leg, #/h 0 0 0 0
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 6.2 12.2 25.5 17.0
Approach LOS A B D C
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 45 295 1162 754
Cap Entry Lane, veh/h 660 660 1291 1014
Entry HV Adj Factor 0.993 0.980 0.980 0.981
Flow Entry, veh/h 45 289 1139 739
Cap Entry, veh/h 655 647 1266 994
V/C Ratio 0.068 0.447 0.900 0.744
Control Delay, s/veh 6.2 12.2 25.5 17.0
LOS A B D C
95th %tile Queue, veh 0 2 14 7
HCM 6th TWSC AM 2028 Build
12: Innovation Pl & Innov.Pl Connector & Internal School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 6.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 231 10 24 0 270 24 0 0 0 30 1 154
Future Vol, veh/h 231 10 24 0 270 24 0 0 0 30 1 154
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 257 11 27 0 300 27 0 0 0 33 1 171
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 327 0 0 38 0 0 939 866 25 853 866 314
Stage 1 - - - - - - 539 539 - 314 314 -
Stage 2 - - - - - - 400 327 - 539 552 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1233 - - 1572 - - 244 291 1051 279 291 726
Stage 1 - - - - - - 527 522 - 697 656 -
Stage 2 - - - - - - 626 648 - 527 515 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1233 - - 1572 - - 155 229 1051 233 229 726
Mov Cap-2 Maneuver - - - - - - 155 229 - 233 229 -
Stage 1 - - - - - - 414 410 - 548 656 -
Stage 2 - - - - - - 478 648 - 414 405 -
Approach EB WB NB SB
HCM Control Delay, s 7.6 0 0 15.8
HCM LOS A C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1233 - - 1572 - - 536
HCM Lane V/C Ratio - 0.208 - - - - - 0.383
HCM Control Delay (s) 0 8.7 0 - 0 - - 15.8
HCM Lane LOS A A A - A - - C
HCM 95th %tile Q(veh) - 0.8 - - 0 - - 1.8
Timings AM 2028 Build w Mitigation
3: SC 6 & Industrial Dr/Glassmaster Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 102 215 351 486 167 230 938 665 232 614
Future Volume (vph) 102 215 351 486 167 230 938 665 232 614
Turn Type D.P+P NA pm+ov D.P+P NA D.P+P NA pm+ov D.P+P NA
Protected Phases 3 8 1 7 4 1 6 7 5 2
Permitted Phases 4 8 8 2 6 6
Detector Phase 3 8 1 7 4 1 6 7 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 24.0 25.0 28.0 28.0 25.0 47.0 28.0 21.0 43.0
Total Split (%) 20.0% 20.0% 20.8% 23.3% 23.3% 20.8% 39.2% 23.3% 17.5% 35.8%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lag Lead Lead Lag Lead Lag Lead Lead Lag
Lead-Lag Optimize?
Recall Mode None None None None None None Min None None Min
Act Effct Green (s) 36.6 17.1 37.8 36.6 26.2 52.4 37.8 63.3 52.4 37.8
Actuated g/C Ratio 0.32 0.15 0.33 0.32 0.23 0.46 0.33 0.56 0.46 0.33
v/c Ratio 0.33 0.85 0.67 0.72 0.60 0.69 0.88 0.78 0.88 0.63
Control Delay 27.3 74.9 31.9 32.7 44.7 26.9 45.8 22.7 59.0 35.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 27.3 74.9 31.9 32.7 44.7 26.9 45.8 22.7 59.0 35.3
LOS C E C C D C D C E D
Approach Delay 45.0 36.5 35.1 41.4
Approach LOS D D D D
Intersection Summary
Cycle Length: 120
Actuated Cycle Length: 113.2
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay: 38.3 Intersection LOS: D
Intersection Capacity Utilization 84.0% ICU Level of Service E
Analysis Period (min) 15
Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd
Phasings AM 2028 Build w Mitigation
3: SC 6 & Industrial Dr/Glassmaster Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT
Protected Phases 3 8 1 7 4 1 6 7 5 2
Permitted Phases 4 8 8 2 6 6
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 24.0 25.0 28.0 28.0 25.0 47.0 28.0 21.0 43.0
Total Split (%) 20.0% 20.0% 20.8% 23.3% 23.3% 20.8% 39.2% 23.3% 17.5% 35.8%
Maximum Green (s) 18.0 18.0 19.0 22.0 22.0 19.0 41.0 22.0 15.0 37.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lead/Lag Lead Lag Lead Lead Lag Lead Lag Lead Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recall Mode None None None None None None Min None None Min
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0 0
90th %ile Green (s) 14.2 18.0 19.0 22.0 25.8 19.0 41.0 22.0 15.0 37.0
90th %ile Term Code Gap Max Max Max Hold Max Max Max Max Max
70th %ile Green (s) 12.0 18.0 17.4 22.0 28.0 17.4 41.0 22.0 15.0 38.6
70th %ile Term Code Gap Max Gap Max Hold Gap Max Max Max Hold
50th %ile Green (s) 10.5 18.0 15.1 21.3 28.8 15.1 41.0 21.3 15.0 40.9
50th %ile Term Code Gap Max Gap Gap Hold Gap Max Gap Max Hold
30th %ile Green (s) 8.9 18.0 12.9 18.8 27.9 12.9 37.9 18.8 15.0 40.0
30th %ile Term Code Gap Max Gap Gap Hold Gap Gap Gap Max Hold
10th %ile Green (s) 6.8 13.7 9.6 13.8 20.7 9.6 28.9 13.8 12.8 32.1
10th %ile Term Code Gap Gap Gap Gap Hold Gap Gap Gap Gap Hold
Intersection Summary
Cycle Length: 120
Actuated Cycle Length: 113.2
Control Type: Actuated-Uncoordinated
90th %ile Actuated Cycle: 120
70th %ile Actuated Cycle: 120
50th %ile Actuated Cycle: 119.3
30th %ile Actuated Cycle: 113.7
10th %ile Actuated Cycle: 93.2
Queues AM 2028 Build w Mitigation
3: SC 6 & Industrial Dr/Glassmaster Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Group Flow (vph) 113 239 390 540 253 256 1042 739 258 736
v/c Ratio 0.33 0.85 0.67 0.72 0.60 0.69 0.88 0.78 0.88 0.63
Control Delay 27.3 74.9 31.9 32.7 44.7 26.9 45.8 22.7 59.0 35.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 27.3 74.9 31.9 32.7 44.7 26.9 45.8 22.7 59.0 35.3
Queue Length 50th (ft) 57 182 206 156 163 107 390 344 141 244
Queue Length 95th (ft) 99 #323 308 204 262 163 484 521 #299 328
Internal Link Dist (ft) 665 963 493 629
Turn Bay Length (ft) 150 325 200 300 200
Base Capacity (vph) 447 298 643 833 428 438 1293 979 302 1209
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.25 0.80 0.61 0.65 0.59 0.58 0.81 0.75 0.85 0.61
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary AM 2028 Build w Mitigation
3: SC 6 & Industrial Dr/Glassmaster Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 102 215 351 486 167 60 230 938 665 232 614 49
Future Volume (veh/h) 102 215 351 486 167 60 230 938 665 232 614 49
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 113 239 390 540 186 67 256 1042 739 258 682 54
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 320 298 426 716 325 117 404 1291 820 288 1216 96
Arrive On Green 0.07 0.16 0.16 0.15 0.25 0.25 0.11 0.36 0.36 0.11 0.36 0.36
Sat Flow, veh/h 1781 1870 1585 3456 1312 473 1781 3554 1585 1781 3336 264
Grp Volume(v), veh/h 113 239 390 540 0 253 256 1042 739 258 363 373
Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1728 0 1785 1781 1777 1585 1781 1777 1823
Q Serve(g_s), s 5.3 13.9 18.0 14.4 0.0 14.0 10.0 29.8 41.0 10.3 18.4 18.5
Cycle Q Clear(g_c), s 5.3 13.9 18.0 14.4 0.0 14.0 10.0 29.8 41.0 10.3 18.4 18.5
Prop In Lane 1.00 1.00 1.00 0.26 1.00 1.00 1.00 0.14
Lane Grp Cap(c), veh/h 320 298 426 716 0 442 404 1291 820 288 648 664
V/C Ratio(X) 0.35 0.80 0.91 0.75 0.00 0.57 0.63 0.81 0.90 0.90 0.56 0.56
Avail Cap(c_a), veh/h 487 298 426 857 0 442 509 1291 820 327 648 664
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.4 45.7 40.0 32.8 0.0 37.2 20.6 32.4 24.7 26.1 28.7 28.7
Incr Delay (d2), s/veh 0.7 14.4 24.1 3.2 0.0 1.8 1.7 3.9 13.1 24.1 1.1 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.2 7.5 12.9 6.1 0.0 6.1 4.1 12.8 19.0 5.8 7.7 7.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 30.0 60.2 64.1 35.9 0.0 39.0 22.3 36.3 37.8 50.2 29.8 29.7
LnGrp LOS C E E D A D C D D D C C
Approach Vol, veh/h 742 793 2037 994
Approach Delay, s/veh 57.7 36.9 35.1 35.1
Approach LOS E D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 18.4 47.1 13.4 34.0 18.5 47.0 23.4 24.0
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 19.0 37.0 18.0 22.0 15.0 41.0 22.0 18.0
Max Q Clear Time (g_c+I1), s 12.0 20.5 7.3 16.0 12.3 43.0 16.4 20.0
Green Ext Time (p_c), s 0.4 3.8 0.2 0.6 0.2 0.0 1.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 39.1
HCM 6th LOS D
HCM 6th TWSC AM 2028 Build w Mitigation
6: Glassmaster Rd & Bruner Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Int Delay, s/veh 4.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 983 82 27 612 50 25
Future Vol, veh/h 983 82 27 612 50 25
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 150 - 100 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1092 91 30 680 56 28
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 1183 0 1878 1138
Stage 1 - - - - 1138 -
Stage 2 - - - - 740 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 590 - 78 245
Stage 1 - - - - 306 -
Stage 2 - - - - 472 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 590 - 74 245
Mov Cap-2 Maneuver - - - - 74 -
Stage 1 - - - - 306 -
Stage 2 - - - - 448 -
Approach EB WB NB
HCM Control Delay, s 0 0.5 98.9
HCM LOS F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 74 245 - - 590 -
HCM Lane V/C Ratio 0.751 0.113 - - 0.051 -
HCM Control Delay (s) 137.5 21.6 - - 11.4 -
HCM Lane LOS F C - - B -
HCM 95th %tile Q(veh) 3.6 0.4 - - 0.2 -
HCM 6th TWSC AM 2028 Build w Mitigation
9: Bruner Rd & School Access
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Int Delay, s/veh 13.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 1025 20 19 0 0 620
Future Vol, veh/h 1025 20 19 0 0 620
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 100 - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1139 22 21 0 0 689
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 21 0 - 0 2321 21
Stage 1 - - - - 21 -
Stage 2 - - - - 2300 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1595 - - - 41 1056
Stage 1 - - - - 1002 -
Stage 2 - - - - 81 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1595 - - - 12 1056
Mov Cap-2 Maneuver - - - - 12 -
Stage 1 - - - - 287 -
Stage 2 - - - - 81 -
Approach EB WB SB
HCM Control Delay, s 12.4 0 14.6
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1595 - - - 1056
HCM Lane V/C Ratio 0.714 - - - 0.652
HCM Control Delay (s) 12.7 - - - 14.6
HCM Lane LOS B - - - B
HCM 95th %tile Q(veh) 6.7 - - - 5.1
HCM 6th TWSC AM 2028 Build w Mitigation
10: SC 6 & Innovation Pl
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Int Delay, s/veh 7.4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 115 309 999 170 95 829
Future Vol, veh/h 115 309 999 170 95 829
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 100 - 100 25 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 128 343 1110 189 106 921
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1783 555 0 0 1299 0
Stage 1 1110 - - - - -
Stage 2 673 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver ~ 73 475 - - 529 -
Stage 1 277 - - - - -
Stage 2 468 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 58 475 - - 529 -
Mov Cap-2 Maneuver 171 - - - - -
Stage 1 277 - - - - -
Stage 2 374 - - - - -
Approach WB NB SB
HCM Control Delay, s 41 0 1.4
HCM LOS E
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 171 475 529 -
HCM Lane V/C Ratio - - 0.747 0.723 0.2 -
HCM Control Delay (s) - - 70.7 29.9 13.5 -
HCM Lane LOS - - F D B -
HCM 95th %tile Q(veh) - - 4.7 5.8 0.7 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Roundabout AM 2028 Build w Mitigation
11: School Access & Innov.Pl Connector
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Intersection Delay, s/veh 8.0
Intersection LOS A
Approach EB NB SB
Entry Lanes 1 1 1
Conflicting Circle Lanes 1 1 1
Adj Approach Flow, veh/h 27 705 660
Demand Flow Rate, veh/h 27 719 674
Vehicles Circulating, veh/h 436 14 8
Vehicles Exiting, veh/h 246 449 725
Ped Vol Crossing Leg, #/h 0 0 0
Ped Cap Adj 1.000 1.000 1.000
Approach Delay, s/veh 4.4 8.3 7.7
Approach LOS A A A
Lane Left Left Left
Designated Moves LR LT TR
Assumed Moves LR LT TR
RT Channelized
Lane Util 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976
Entry Flow, veh/h 27 719 674
Cap Entry Lane, veh/h 885 1360 1369
Entry HV Adj Factor 1.000 0.981 0.980
Flow Entry, veh/h 27 705 660
Cap Entry, veh/h 885 1334 1341
V/C Ratio 0.031 0.529 0.492
Control Delay, s/veh 4.4 8.3 7.7
LOS A A A
95th %tile Queue, veh 0 3 3
HCM 6th TWSC AM 2028 Build w Mitigation
12: Innovation Pl & Innov.Pl Connector & Internal School Access
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Int Delay, s/veh 6.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 231 10 24 0 270 24 0 0 0 30 1 154
Future Vol, veh/h 231 10 24 0 270 24 0 0 0 30 1 154
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 257 11 27 0 300 27 0 0 0 33 1 171
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 327 0 0 38 0 0 939 866 25 853 866 314
Stage 1 - - - - - - 539 539 - 314 314 -
Stage 2 - - - - - - 400 327 - 539 552 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1233 - - 1572 - - 244 291 1051 279 291 726
Stage 1 - - - - - - 527 522 - 697 656 -
Stage 2 - - - - - - 626 648 - 527 515 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1233 - - 1572 - - 155 229 1051 233 229 726
Mov Cap-2 Maneuver - - - - - - 155 229 - 233 229 -
Stage 1 - - - - - - 414 410 - 548 656 -
Stage 2 - - - - - - 478 648 - 414 405 -
Approach EB WB NB SB
HCM Control Delay, s 7.6 0 0 15.8
HCM LOS A C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1233 - - 1572 - - 536
HCM Lane V/C Ratio - 0.208 - - - - - 0.383
HCM Control Delay (s) 0 8.7 0 - 0 - - 15.8
HCM Lane LOS A A A - A - - C
HCM 95th %tile Q(veh) - 0.8 - - 0 - - 1.8
Timings PM 2026 Existing
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 61 256 333 85 230 861 193 73 858
Future Volume (vph) 61 256 333 85 230 861 193 73 858
Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Detector Phase 8 1 4 4 1 6 4 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0
Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Recall Mode None None None None None Min None None Min
Act Effct Green (s) 14.7 34.8 16.0 16.0 47.2 42.5 64.5 48.7 33.2
Actuated g/C Ratio 0.14 0.34 0.16 0.16 0.46 0.42 0.63 0.48 0.32
v/c Ratio 0.69 0.48 0.69 0.48 0.82 0.65 0.20 0.31 0.88
Control Delay 57.5 21.4 49.3 41.6 47.6 28.4 1.8 16.7 43.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 57.5 21.4 49.3 41.6 47.6 28.4 1.8 16.7 43.0
LOS E C D D D C A B D
Approach Delay 35.4 47.2 27.9 41.0
Approach LOS D D C D
Intersection Summary
Cycle Length: 111
Actuated Cycle Length: 102.2
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay: 35.8 Intersection LOS: D
Intersection Capacity Utilization 76.2% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd
Phasings PM 2026 Existing
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0
Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8%
Maximum Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recall Mode None None None None None Min None None Min
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
90th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
90th %ile Term Code Max Max Max Max Max Max Max Max Max
70th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
70th %ile Term Code Max Max Max Max Max Hold Max Max Max
50th %ile Green (s) 16.0 15.0 17.7 17.7 15.0 43.1 17.7 7.9 36.0
50th %ile Term Code Gap Max Gap Gap Max Hold Gap Gap Max
30th %ile Green (s) 13.2 14.5 15.5 15.5 14.5 40.6 15.5 6.9 33.0
30th %ile Term Code Gap Gap Gap Gap Gap Hold Gap Gap Gap
10th %ile Green (s) 9.3 10.4 11.1 11.1 10.4 41.6 11.1 0.0 25.2
10th %ile Term Code Gap Gap Gap Gap Gap Hold Gap Skip Gap
Intersection Summary
Cycle Length: 111
Actuated Cycle Length: 102.2
Control Type: Actuated-Uncoordinated
90th %ile Actuated Cycle: 111
70th %ile Actuated Cycle: 111
50th %ile Actuated Cycle: 108.7
30th %ile Actuated Cycle: 100.2
10th %ile Actuated Cycle: 80
Queues PM 2026 Existing
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Group Flow (vph) 180 284 370 141 256 957 214 81 1002
v/c Ratio 0.69 0.48 0.69 0.48 0.82 0.65 0.20 0.31 0.88
Control Delay 57.5 21.4 49.3 41.6 47.6 28.4 1.8 16.7 43.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 57.5 21.4 49.3 41.6 47.6 28.4 1.8 16.7 43.0
Queue Length 50th (ft) 121 105 126 78 120 285 0 27 340
Queue Length 95th (ft) 196 185 179 143 #261 378 30 54 #466
Internal Link Dist (ft) 665 963 493 629
Turn Bay Length (ft) 325 200 300 200
Base Capacity (vph) 323 615 614 331 333 1484 1109 286 1260
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.56 0.46 0.60 0.43 0.77 0.64 0.19 0.28 0.80
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary PM 2026 Existing
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 101 61 256 333 85 42 230 861 193 73 858 44
Future Volume (veh/h) 101 61 256 333 85 42 230 861 193 73 858 44
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 112 68 284 370 94 47 256 957 214 81 953 49
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 200 121 467 469 160 80 318 1395 837 237 1103 57
Arrive On Green 0.18 0.18 0.18 0.14 0.14 0.14 0.12 0.39 0.39 0.05 0.32 0.32
Sat Flow, veh/h 1129 685 1585 3456 1176 588 1781 3554 1585 1781 3439 177
Grp Volume(v), veh/h 180 0 284 370 0 141 256 957 214 81 492 510
Grp Sat Flow(s),veh/h/ln 1814 0 1585 1728 0 1764 1781 1777 1585 1781 1777 1839
Q Serve(g_s), s 8.8 0.0 14.9 10.0 0.0 7.2 9.1 21.6 7.1 2.6 25.1 25.1
Cycle Q Clear(g_c), s 8.8 0.0 14.9 10.0 0.0 7.2 9.1 21.6 7.1 2.6 25.1 25.1
Prop In Lane 0.62 1.00 1.00 0.33 1.00 1.00 1.00 0.10
Lane Grp Cap(c), veh/h 322 0 467 469 0 240 318 1395 837 237 570 590
V/C Ratio(X) 0.56 0.00 0.61 0.79 0.00 0.59 0.81 0.69 0.26 0.34 0.86 0.86
Avail Cap(c_a), veh/h 338 0 482 644 0 329 385 1546 905 321 662 685
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 36.3 0.0 29.2 40.4 0.0 39.2 22.4 24.4 12.4 18.9 30.8 30.8
Incr Delay (d2), s/veh 1.9 0.0 2.1 4.5 0.0 2.3 10.0 1.1 0.2 0.8 10.3 10.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.9 0.0 5.6 4.4 0.0 3.2 4.3 8.6 3.2 1.0 11.6 11.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 38.2 0.0 31.3 44.9 0.0 41.5 32.3 25.5 12.6 19.7 41.1 40.8
LnGrp LOS D A C D A D C C B B D D
Approach Vol, veh/h 464 511 1427 1083
Approach Delay, s/veh 34.0 44.0 24.8 39.3
Approach LOS C D C D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 17.4 37.0 19.1 10.4 43.9 23.1
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 15.0 36.0 18.0 9.0 42.0 18.0
Max Q Clear Time (g_c+I1), s 11.1 27.1 12.0 4.6 23.6 16.9
Green Ext Time (p_c), s 0.3 3.8 1.1 0.1 6.7 0.3
Intersection Summary
HCM 6th Ctrl Delay 33.3
HCM 6th LOS C
HCM 6th TWSC PM 2026 Existing
6: Glassmaster Rd & Bruner Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 2.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 270 58 63 300 56 49
Future Vol, veh/h 270 58 63 300 56 49
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 300 64 70 333 62 54
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 364 0 805 332
Stage 1 - - - - 332 -
Stage 2 - - - - 473 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1195 - 352 710
Stage 1 - - - - 727 -
Stage 2 - - - - 627 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1195 - 327 710
Mov Cap-2 Maneuver - - - - 327 -
Stage 1 - - - - 727 -
Stage 2 - - - - 582 -
Approach EB WB NB
HCM Control Delay, s 0 1.4 16.2
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 437 - - 1195 -
HCM Lane V/C Ratio 0.267 - - 0.059 -
HCM Control Delay (s) 16.2 - - 8.2 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 1.1 - - 0.2 -
HCM 6th TWSC PM 2026 Existing
9: Bruner Rd & School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 8.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 256 73 14 42 4 404
Future Vol, veh/h 256 73 14 42 4 404
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 284 81 16 47 4 449
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 63 0 - 0 689 40
Stage 1 - - - - 40 -
Stage 2 - - - - 649 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1540 - - - 412 1031
Stage 1 - - - - 982 -
Stage 2 - - - - 520 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1540 - - - 332 1031
Mov Cap-2 Maneuver - - - - 332 -
Stage 1 - - - - 792 -
Stage 2 - - - - 520 -
Approach EB WB SB
HCM Control Delay, s 6.1 0 11.4
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1540 - - - 1010
HCM Lane V/C Ratio 0.185 - - - 0.449
HCM Control Delay (s) 7.9 0 - - 11.4
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0.7 - - - 2.4
HCM 6th TWSC PM 2026 Existing
10: SC 6 & Innovation Pl
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 2.5
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 73 164 932 90 20 948
Future Vol, veh/h 73 164 932 90 20 948
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 100 - - 25 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 81 182 1036 100 22 1053
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1657 568 0 0 1136 0
Stage 1 1086 - - - - -
Stage 2 571 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 89 466 - - 611 -
Stage 1 285 - - - - -
Stage 2 529 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 86 466 - - 611 -
Mov Cap-2 Maneuver 202 - - - - -
Stage 1 285 - - - - -
Stage 2 510 - - - - -
Approach WB NB SB
HCM Control Delay, s 22.7 0 0.2
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 202 466 611 -
HCM Lane V/C Ratio - - 0.402 0.391 0.036 -
HCM Control Delay (s) - - 34.3 17.6 11.1 -
HCM Lane LOS - - D C B -
HCM 95th %tile Q(veh) - - 1.8 1.8 0.1 -
HCM 6th Roundabout PM 2026 Existing
11: School Access/6-12 & Innov.Pl Connector/K-5
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Intersection Delay, s/veh 5.4
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1 1 1 1
Conflicting Circle Lanes 1 1 1 1
Adj Approach Flow, veh/h 63 254 407 245
Demand Flow Rate, veh/h 64 259 414 250
Vehicles Circulating, veh/h 352 200 13 275
Vehicles Exiting, veh/h 173 227 403 184
Ped Vol Crossing Leg, #/h 0 0 0 0
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 4.4 5.4 5.4 5.8
Approach LOS A A A A
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 64 259 414 250
Cap Entry Lane, veh/h 964 1125 1362 1042
Entry HV Adj Factor 0.983 0.979 0.982 0.979
Flow Entry, veh/h 63 254 407 245
Cap Entry, veh/h 948 1102 1337 1021
V/C Ratio 0.066 0.230 0.304 0.240
Control Delay, s/veh 4.4 5.4 5.4 5.8
LOS A A A A
95th %tile Queue, veh 0 1 1 1
HCM 6th TWSC PM 2026 Existing
12: Innovation Pl & Innov.Pl Connector & Internal School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 6.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 102 6 0 0 119 29 0 0 0 51 1 115
Future Vol, veh/h 102 6 0 0 119 29 0 0 0 51 1 115
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 113 7 0 0 132 32 0 0 0 57 1 128
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 164 0 0 7 0 0 446 397 7 381 381 148
Stage 1 - - - - - - 233 233 - 148 148 -
Stage 2 - - - - - - 213 164 - 233 233 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1414 - - 1614 - - 523 540 1075 577 552 899
Stage 1 - - - - - - 770 712 - 855 775 -
Stage 2 - - - - - - 789 762 - 770 712 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1414 - - 1614 - - 420 497 1075 542 508 899
Mov Cap-2 Maneuver - - - - - - 420 497 - 542 508 -
Stage 1 - - - - - - 708 655 - 787 775 -
Stage 2 - - - - - - 676 762 - 708 655 -
Approach EB WB NB SB
HCM Control Delay, s 7.3 0 0 11.4
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1414 - - 1614 - - 746
HCM Lane V/C Ratio - 0.08 - - - - - 0.249
HCM Control Delay (s) 0 7.8 0 - 0 - - 11.4
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0.3 - - 0 - - 1
Timings PM 2028 Background
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 63 264 343 88 237 887 199 75 884
Future Volume (vph) 63 264 343 88 237 887 199 75 884
Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Detector Phase 8 1 4 4 1 6 4 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0
Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Recall Mode None None None None None Min None None Min
Act Effct Green (s) 14.9 35.2 16.2 16.2 48.3 43.5 65.8 49.8 34.1
Actuated g/C Ratio 0.14 0.34 0.16 0.16 0.47 0.42 0.63 0.48 0.33
v/c Ratio 0.72 0.49 0.71 0.50 0.85 0.66 0.20 0.32 0.89
Control Delay 59.4 22.2 50.6 42.5 51.3 28.9 1.8 17.1 44.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 59.4 22.2 50.6 42.5 51.3 28.9 1.8 17.1 44.4
LOS E C D D D C A B D
Approach Delay 36.6 48.4 28.8 42.4
Approach LOS D D C D
Intersection Summary
Cycle Length: 111
Actuated Cycle Length: 103.7
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.89
Intersection Signal Delay: 36.9 Intersection LOS: D
Intersection Capacity Utilization 77.9% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd
Phasings PM 2028 Background
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0
Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8%
Maximum Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recall Mode None None None None None Min None None Min
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
90th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
90th %ile Term Code Max Max Max Max Max Max Max Max Max
70th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
70th %ile Term Code Max Max Max Max Max Hold Max Max Max
50th %ile Green (s) 16.4 15.0 18.0 18.0 15.0 43.0 18.0 8.0 36.0
50th %ile Term Code Gap Max Max Max Max Hold Max Gap Max
30th %ile Green (s) 13.6 15.0 15.9 15.9 15.0 43.9 15.9 7.0 35.9
30th %ile Term Code Gap Max Gap Gap Max Hold Gap Gap Gap
10th %ile Green (s) 9.6 10.9 11.4 11.4 10.9 43.7 11.4 0.0 26.8
10th %ile Term Code Gap Gap Gap Gap Gap Hold Gap Skip Gap
Intersection Summary
Cycle Length: 111
Actuated Cycle Length: 103.7
Control Type: Actuated-Uncoordinated
90th %ile Actuated Cycle: 111
70th %ile Actuated Cycle: 111
50th %ile Actuated Cycle: 109.4
30th %ile Actuated Cycle: 104.4
10th %ile Actuated Cycle: 82.7
Queues PM 2028 Background
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Group Flow (vph) 186 293 381 146 263 986 221 83 1032
v/c Ratio 0.72 0.49 0.71 0.50 0.85 0.66 0.20 0.32 0.89
Control Delay 59.4 22.2 50.6 42.5 51.3 28.9 1.8 17.1 44.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 59.4 22.2 50.6 42.5 51.3 28.9 1.8 17.1 44.4
Queue Length 50th (ft) 125 111 130 81 128 301 0 28 357
Queue Length 95th (ft) 203 193 185 148 #278 393 30 55 #491
Internal Link Dist (ft) 665 963 493 629
Turn Bay Length (ft) 325 200 300 200
Base Capacity (vph) 317 610 603 327 327 1485 1111 277 1238
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.59 0.48 0.63 0.45 0.80 0.66 0.20 0.30 0.83
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary PM 2028 Background
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 104 63 264 343 88 43 237 887 199 75 884 45
Future Volume (veh/h) 104 63 264 343 88 43 237 887 199 75 884 45
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 116 70 293 381 98 48 263 986 221 83 982 50
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 203 122 473 475 163 80 313 1413 848 229 1114 57
Arrive On Green 0.18 0.18 0.18 0.14 0.14 0.14 0.12 0.40 0.40 0.05 0.32 0.32
Sat Flow, veh/h 1131 683 1585 3456 1185 581 1781 3554 1585 1781 3440 175
Grp Volume(v), veh/h 186 0 293 381 0 146 263 986 221 83 507 525
Grp Sat Flow(s),veh/h/ln 1814 0 1585 1728 0 1766 1781 1777 1585 1781 1777 1839
Q Serve(g_s), s 9.4 0.0 15.9 10.7 0.0 7.8 9.6 23.1 7.5 2.7 27.0 27.0
Cycle Q Clear(g_c), s 9.4 0.0 15.9 10.7 0.0 7.8 9.6 23.1 7.5 2.7 27.0 27.0
Prop In Lane 0.62 1.00 1.00 0.33 1.00 1.00 1.00 0.10
Lane Grp Cap(c), veh/h 325 0 473 475 0 243 313 1413 848 229 575 595
V/C Ratio(X) 0.57 0.00 0.62 0.80 0.00 0.60 0.84 0.70 0.26 0.36 0.88 0.88
Avail Cap(c_a), veh/h 327 0 474 623 0 318 369 1495 885 310 641 663
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 37.5 0.0 30.2 41.7 0.0 40.5 23.1 25.1 12.5 19.5 31.9 31.9
Incr Delay (d2), s/veh 2.4 0.0 2.5 5.6 0.0 2.4 13.9 1.4 0.2 1.0 12.6 12.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.2 0.0 6.0 4.7 0.0 3.4 4.9 9.2 3.4 1.1 12.8 13.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 39.8 0.0 32.6 47.4 0.0 42.9 37.0 26.4 12.7 20.5 44.6 44.2
LnGrp LOS D A C D A D D C B C D D
Approach Vol, veh/h 479 527 1470 1115
Approach Delay, s/veh 35.4 46.1 26.3 42.6
Approach LOS D D C D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 17.9 38.3 19.7 10.5 45.7 23.9
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 15.0 36.0 18.0 9.0 42.0 18.0
Max Q Clear Time (g_c+I1), s 11.6 29.0 12.7 4.7 25.1 17.9
Green Ext Time (p_c), s 0.2 3.4 1.1 0.1 6.7 0.0
Intersection Summary
HCM 6th Ctrl Delay 35.5
HCM 6th LOS D
HCM 6th TWSC PM 2028 Background
6: Glassmaster Rd & Bruner Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 1.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 278 60 20 410 58 20
Future Vol, veh/h 278 60 20 410 58 20
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 309 67 22 456 64 22
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 376 0 843 343
Stage 1 - - - - 343 -
Stage 2 - - - - 500 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1182 - 334 700
Stage 1 - - - - 719 -
Stage 2 - - - - 609 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1182 - 326 700
Mov Cap-2 Maneuver - - - - 326 -
Stage 1 - - - - 719 -
Stage 2 - - - - 594 -
Approach EB WB NB
HCM Control Delay, s 0 0.4 17.3
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 378 - - 1182 -
HCM Lane V/C Ratio 0.229 - - 0.019 -
HCM Control Delay (s) 17.3 - - 8.1 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 0.9 - - 0.1 -
HCM 6th TWSC PM 2028 Background
9: Bruner Rd & School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 9.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 335 20 14 0 0 420
Future Vol, veh/h 335 20 14 0 0 420
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 372 22 16 0 0 467
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 16 0 - 0 782 16
Stage 1 - - - - 16 -
Stage 2 - - - - 766 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1602 - - - 363 1063
Stage 1 - - - - 1007 -
Stage 2 - - - - 459 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1602 - - - 278 1063
Mov Cap-2 Maneuver - - - - 278 -
Stage 1 - - - - 770 -
Stage 2 - - - - 459 -
Approach EB WB SB
HCM Control Delay, s 7.5 0 11
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1602 - - - 1063
HCM Lane V/C Ratio 0.232 - - - 0.439
HCM Control Delay (s) 7.9 0 - - 11
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0.9 - - - 2.3
HCM 6th TWSC PM 2028 Background
10: SC 6 & Innovation Pl
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 2.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 75 169 960 93 21 976
Future Vol, veh/h 75 169 960 93 21 976
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 100 - - 25 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 83 188 1067 103 23 1084
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1707 585 0 0 1170 0
Stage 1 1119 - - - - -
Stage 2 588 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver ~ 82 454 - - 593 -
Stage 1 274 - - - - -
Stage 2 518 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 79 454 - - 593 -
Mov Cap-2 Maneuver 194 - - - - -
Stage 1 274 - - - - -
Stage 2 498 - - - - -
Approach WB NB SB
HCM Control Delay, s 24.1 0 0.2
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 194 454 593 -
HCM Lane V/C Ratio - - 0.43 0.414 0.039 -
HCM Control Delay (s) - - 36.8 18.4 11.3 -
HCM Lane LOS - - E C B -
HCM 95th %tile Q(veh) - - 2 2 0.1 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Roundabout PM 2028 Background
11: School Access/6-12 & Innov.Pl Connector/K-5
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Intersection Delay, s/veh 5.4
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1 1 1 1
Conflicting Circle Lanes 1 1 1 1
Adj Approach Flow, veh/h 63 254 407 245
Demand Flow Rate, veh/h 64 259 414 250
Vehicles Circulating, veh/h 352 200 13 275
Vehicles Exiting, veh/h 173 227 403 184
Ped Vol Crossing Leg, #/h 0 0 0 0
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 4.4 5.4 5.4 5.8
Approach LOS A A A A
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 64 259 414 250
Cap Entry Lane, veh/h 964 1125 1362 1042
Entry HV Adj Factor 0.983 0.979 0.982 0.979
Flow Entry, veh/h 63 254 407 245
Cap Entry, veh/h 948 1102 1337 1021
V/C Ratio 0.066 0.230 0.304 0.240
Control Delay, s/veh 4.4 5.4 5.4 5.8
LOS A A A A
95th %tile Queue, veh 0 1 1 1
HCM 6th TWSC PM 2028 Background
12: Innovation Pl & Innov.Pl Connector & Internal School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 6.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 102 6 0 0 119 29 0 0 0 51 1 115
Future Vol, veh/h 102 6 0 0 119 29 0 0 0 51 1 115
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 113 7 0 0 132 32 0 0 0 57 1 128
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 164 0 0 7 0 0 446 397 7 381 381 148
Stage 1 - - - - - - 233 233 - 148 148 -
Stage 2 - - - - - - 213 164 - 233 233 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1414 - - 1614 - - 523 540 1075 577 552 899
Stage 1 - - - - - - 770 712 - 855 775 -
Stage 2 - - - - - - 789 762 - 770 712 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1414 - - 1614 - - 420 497 1075 542 508 899
Mov Cap-2 Maneuver - - - - - - 420 497 - 542 508 -
Stage 1 - - - - - - 708 655 - 787 775 -
Stage 2 - - - - - - 676 762 - 708 655 -
Approach EB WB NB SB
HCM Control Delay, s 7.3 0 0 11.4
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1414 - - 1614 - - 746
HCM Lane V/C Ratio - 0.08 - - - - - 0.249
HCM Control Delay (s) 0 7.8 0 - 0 - - 11.4
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0.3 - - 0 - - 1
Timings PM 2028 Build
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 91 264 507 145 237 933 311 124 915
Future Volume (vph) 91 264 507 145 237 933 311 124 915
Turn Type NA pm+ov Split NA D.P+P NA pm+ov D.P+P NA
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Detector Phase 8 1 4 4 1 6 4 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0
Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Recall Mode None None None None None Min None None Min
Act Effct Green (s) 16.1 36.4 18.1 18.1 49.3 40.8 64.9 49.3 35.0
Actuated g/C Ratio 0.15 0.34 0.17 0.17 0.46 0.38 0.60 0.46 0.33
v/c Ratio 0.78 0.49 0.98 0.75 0.87 0.77 0.32 0.62 0.93
Control Delay 64.3 22.5 78.2 56.3 54.5 34.3 1.9 28.5 50.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 64.3 22.5 78.2 56.3 54.5 34.3 1.9 28.5 50.6
LOS E C E E D C A C D
Approach Delay 40.0 71.8 30.7 48.1
Approach LOS D E C D
Intersection Summary
Cycle Length: 111
Actuated Cycle Length: 107.5
Natural Cycle: 100
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.98
Intersection Signal Delay: 44.7 Intersection LOS: D
Intersection Capacity Utilization 84.7% ICU Level of Service E
Analysis Period (min) 15
Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd
Phasings PM 2028 Build
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Protected Phases 8 1 4 4 1 6 4 5 2
Permitted Phases 8 2 6 6
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 21.0 24.0 24.0 21.0 48.0 24.0 15.0 42.0
Total Split (%) 21.6% 18.9% 21.6% 21.6% 18.9% 43.2% 21.6% 13.5% 37.8%
Maximum Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recall Mode None None None None None Min None None Min
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
90th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
90th %ile Term Code Max Max Max Max Max Max Max Max Max
70th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
70th %ile Term Code Max Max Max Max Max Max Max Max Max
50th %ile Green (s) 18.0 15.0 18.0 18.0 15.0 42.0 18.0 9.0 36.0
50th %ile Term Code Max Max Max Max Max Hold Max Max Max
30th %ile Green (s) 15.6 15.0 18.0 18.0 15.0 42.4 18.0 8.6 36.0
30th %ile Term Code Gap Max Max Max Max Hold Max Gap Max
10th %ile Green (s) 11.4 11.5 18.0 18.0 11.5 35.8 18.0 6.9 31.2
10th %ile Term Code Gap Gap Max Max Gap Hold Max Gap Gap
Intersection Summary
Cycle Length: 111
Actuated Cycle Length: 107.5
Control Type: Actuated-Uncoordinated
90th %ile Actuated Cycle: 111
70th %ile Actuated Cycle: 111
50th %ile Actuated Cycle: 111
30th %ile Actuated Cycle: 108.6
10th %ile Actuated Cycle: 96.1
Queues PM 2028 Build
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Lane Group EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Group Flow (vph) 211 293 563 233 263 1037 346 138 1071
v/c Ratio 0.78 0.49 0.98 0.75 0.87 0.77 0.32 0.62 0.93
Control Delay 64.3 22.5 78.2 56.3 54.5 34.3 1.9 28.5 50.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 64.3 22.5 78.2 56.3 54.5 34.3 1.9 28.5 50.6
Queue Length 50th (ft) 144 111 ~212 149 131 337 0 50 386
Queue Length 95th (ft) #245 193 #328 #268 #276 421 36 94 #523
Internal Link Dist (ft) 665 963 493 629
Turn Bay Length (ft) 325 200 300 200
Base Capacity (vph) 304 604 576 312 316 1389 1092 233 1182
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.69 0.49 0.98 0.75 0.83 0.75 0.32 0.59 0.91
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary PM 2028 Build
3: SC 6 & Industrial Dr/Glassmaster Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 99 91 264 507 145 65 237 933 311 124 915 49
Future Volume (veh/h) 99 91 264 507 145 65 237 933 311 124 915 49
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 110 101 293 563 161 72 263 1037 346 138 1017 54
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 160 147 453 581 206 92 296 1331 860 229 1106 59
Arrive On Green 0.17 0.17 0.17 0.17 0.17 0.17 0.12 0.37 0.37 0.07 0.32 0.32
Sat Flow, veh/h 950 873 1585 3456 1224 548 1781 3554 1585 1781 3432 182
Grp Volume(v), veh/h 211 0 293 563 0 233 263 1037 346 138 526 545
Grp Sat Flow(s),veh/h/ln 1823 0 1585 1728 0 1772 1781 1777 1585 1781 1777 1838
Q Serve(g_s), s 11.7 0.0 17.4 17.3 0.0 13.5 10.4 27.6 13.7 5.0 30.6 30.6
Cycle Q Clear(g_c), s 11.7 0.0 17.4 17.3 0.0 13.5 10.4 27.6 13.7 5.0 30.6 30.6
Prop In Lane 0.52 1.00 1.00 0.31 1.00 1.00 1.00 0.10
Lane Grp Cap(c), veh/h 306 0 453 581 0 298 296 1331 860 229 573 592
V/C Ratio(X) 0.69 0.00 0.65 0.97 0.00 0.78 0.89 0.78 0.40 0.60 0.92 0.92
Avail Cap(c_a), veh/h 306 0 453 581 0 298 336 1393 888 263 597 618
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 41.9 0.0 33.5 44.3 0.0 42.7 25.1 29.6 14.3 23.7 34.9 35.0
Incr Delay (d2), s/veh 6.4 0.0 3.2 29.7 0.0 12.7 22.2 2.8 0.3 3.0 19.1 18.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.6 0.0 6.8 9.5 0.0 6.7 5.9 11.5 6.7 2.1 15.4 15.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 48.3 0.0 36.7 73.9 0.0 55.4 47.3 32.3 14.6 26.6 54.0 53.6
LnGrp LOS D A D E A E D C B C D D
Approach Vol, veh/h 504 796 1646 1209
Approach Delay, s/veh 41.6 68.5 31.0 50.7
Approach LOS D E C D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 18.6 40.5 24.0 13.0 46.1 24.0
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 15.0 36.0 18.0 9.0 42.0 18.0
Max Q Clear Time (g_c+I1), s 12.4 32.6 19.3 7.0 29.6 19.4
Green Ext Time (p_c), s 0.2 2.0 0.0 0.1 6.3 0.0
Intersection Summary
HCM 6th Ctrl Delay 45.2
HCM 6th LOS D
HCM 6th TWSC PM 2028 Build
6: Glassmaster Rd & Bruner Rd
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 2.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 466 68 28 661 61 23
Future Vol, veh/h 466 68 28 661 61 23
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 518 76 31 734 68 26
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 594 0 1352 556
Stage 1 - - - - 556 -
Stage 2 - - - - 796 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 982 - 165 531
Stage 1 - - - - 574 -
Stage 2 - - - - 444 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 982 - 156 531
Mov Cap-2 Maneuver - - - - 156 -
Stage 1 - - - - 574 -
Stage 2 - - - - 420 -
Approach EB WB NB
HCM Control Delay, s 0 0.4 40
HCM LOS E
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 193 - - 982 -
HCM Lane V/C Ratio 0.484 - - 0.032 -
HCM Control Delay (s) 40 - - 8.8 0
HCM Lane LOS E - - A A
HCM 95th %tile Q(veh) 2.4 - - 0.1 -
HCM 6th TWSC PM 2028 Build
9: Bruner Rd & School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 12.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 526 20 14 0 0 668
Future Vol, veh/h 526 20 14 0 0 668
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 584 22 16 0 0 742
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 16 0 - 0 1206 16
Stage 1 - - - - 16 -
Stage 2 - - - - 1190 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1602 - - - 203 1063
Stage 1 - - - - 1007 -
Stage 2 - - - - 289 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1602 - - - 128 1063
Mov Cap-2 Maneuver - - - - 128 -
Stage 1 - - - - 635 -
Stage 2 - - - - 289 -
Approach EB WB SB
HCM Control Delay, s 8.2 0 15.8
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1602 - - - 1063
HCM Lane V/C Ratio 0.365 - - - 0.698
HCM Control Delay (s) 8.5 0 - - 15.8
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh) 1.7 - - - 6
HCM 6th TWSC PM 2028 Build
10: SC 6 & Innovation Pl
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 6.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 117 261 979 146 31 1017
Future Vol, veh/h 117 261 979 146 31 1017
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 100 - - 25 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 130 290 1088 162 34 1130
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1802 625 0 0 1250 0
Stage 1 1169 - - - - -
Stage 2 633 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver ~ 71 428 - - 553 -
Stage 1 258 - - - - -
Stage 2 491 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 67 428 - - 553 -
Mov Cap-2 Maneuver 179 - - - - -
Stage 1 258 - - - - -
Stage 2 461 - - - - -
Approach WB NB SB
HCM Control Delay, s 40.4 0 0.4
HCM LOS E
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 179 428 553 -
HCM Lane V/C Ratio - - 0.726 0.678 0.062 -
HCM Control Delay (s) - - 65.3 29.3 11.9 -
HCM Lane LOS - - F D B -
HCM 95th %tile Q(veh) - - 4.6 4.9 0.2 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Roundabout PM 2028 Build
11: School Access/6-12 & Innov.Pl Connector/K-5
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Intersection Delay, s/veh 9.3
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1 1 1 1
Conflicting Circle Lanes 1 1 1 1
Adj Approach Flow, veh/h 103 460 584 444
Demand Flow Rate, veh/h 105 469 595 453
Vehicles Circulating, veh/h 665 370 13 490
Vehicles Exiting, veh/h 278 238 757 349
Ped Vol Crossing Leg, #/h 0 0 0 0
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 6.9 10.1 7.0 12.1
Approach LOS A B A B
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 105 469 595 453
Cap Entry Lane, veh/h 700 946 1362 837
Entry HV Adj Factor 0.980 0.980 0.982 0.980
Flow Entry, veh/h 103 460 584 444
Cap Entry, veh/h 686 927 1337 820
V/C Ratio 0.150 0.496 0.437 0.541
Control Delay, s/veh 6.9 10.1 7.0 12.1
LOS A B A B
95th %tile Queue, veh 1 3 2 3
HCM 6th TWSC PM 2028 Build
12: Innovation Pl & Innov.Pl Connector & Internal School Access
04/20/2026
213790 ALA Academy Lexington SC Charter School TIA 2026 Existing Conditions.syn Synchro 11 Report
Intersection
Int Delay, s/veh 9.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 168 9 0 0 192 53 0 0 0 83 2 186
Future Vol, veh/h 168 9 0 0 192 53 0 0 0 83 2 186
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 187 10 0 0 213 59 0 0 0 92 2 207
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 272 0 0 10 0 0 731 656 10 627 627 243
Stage 1 - - - - - - 384 384 - 243 243 -
Stage 2 - - - - - - 347 272 - 384 384 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1291 - - 1610 - - 337 385 1071 396 400 796
Stage 1 - - - - - - 639 611 - 761 705 -
Stage 2 - - - - - - 669 685 - 639 611 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1291 - - 1610 - - 220 329 1071 352 342 796
Mov Cap-2 Maneuver - - - - - - 220 329 - 352 342 -
Stage 1 - - - - - - 546 522 - 650 705 -
Stage 2 - - - - - - 494 685 - 546 522 -
Approach EB WB NB SB
HCM Control Delay, s 7.8 0 0 18.2
HCM LOS A C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1291 - - 1610 - - 570
HCM Lane V/C Ratio - 0.145 - - - - - 0.528
HCM Control Delay (s) 0 8.3 0 - 0 - - 18.2
HCM Lane LOS A A A - A - - C
HCM 95th %tile Q(veh) - 0.5 - - 0 - - 3.1
Timings PM 2028 Build w Mitigation
3: SC 6 & Industrial Dr/Glassmaster Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 99 91 264 507 145 237 933 311 124 915
Future Volume (vph) 99 91 264 507 145 237 933 311 124 915
Turn Type D.P+P NA pm+ov D.P+P NA D.P+P NA pm+ov D.P+P NA
Protected Phases 3 8 1 7 4 1 6 7 5 2
Permitted Phases 4 8 8 2 6 6
Detector Phase 3 8 1 7 4 1 6 7 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 24.0 25.0 28.0 28.0 25.0 47.0 28.0 21.0 43.0
Total Split (%) 20.0% 20.0% 20.8% 23.3% 23.3% 20.8% 39.2% 23.3% 17.5% 35.8%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lag Lead Lead Lag Lead Lag Lead Lead Lag
Lead-Lag Optimize?
Recall Mode None None None None None None Min None None Min
Act Effct Green (s) 30.3 11.2 33.0 30.3 20.2 52.3 42.2 67.3 52.3 36.6
Actuated g/C Ratio 0.28 0.10 0.31 0.28 0.19 0.49 0.39 0.63 0.49 0.34
v/c Ratio 0.35 0.52 0.54 0.64 0.67 0.80 0.74 0.31 0.52 0.89
Control Delay 28.7 56.7 25.6 31.9 48.7 44.9 33.1 1.9 21.3 44.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 28.7 56.7 25.6 31.9 48.7 44.9 33.1 1.9 21.3 44.9
LOS C E C C D D C A C D
Approach Delay 32.5 36.8 28.4 42.2
Approach LOS C D C D
Intersection Summary
Cycle Length: 120
Actuated Cycle Length: 106.9
Natural Cycle: 100
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.89
Intersection Signal Delay: 34.5 Intersection LOS: C
Intersection Capacity Utilization 79.2% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 3: SC 6 & Industrial Dr/Glassmaster Rd
Phasings PM 2028 Build w Mitigation
3: SC 6 & Industrial Dr/Glassmaster Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT
Protected Phases 3 8 1 7 4 1 6 7 5 2
Permitted Phases 4 8 8 2 6 6
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 24.0 24.0 15.0 24.0 24.0 15.0 24.0 24.0 15.0 24.0
Total Split (s) 24.0 24.0 25.0 28.0 28.0 25.0 47.0 28.0 21.0 43.0
Total Split (%) 20.0% 20.0% 20.8% 23.3% 23.3% 20.8% 39.2% 23.3% 17.5% 35.8%
Maximum Green (s) 18.0 18.0 19.0 22.0 22.0 19.0 41.0 22.0 15.0 37.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lead/Lag Lead Lag Lead Lead Lag Lead Lag Lead Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Recall Mode None None None None None None Min None None Min
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0 0
90th %ile Green (s) 14.0 16.1 19.0 22.0 24.1 19.0 41.0 22.0 15.0 37.0
90th %ile Term Code Gap Gap Max Max Hold Max Max Max Max Max
70th %ile Green (s) 11.8 13.3 19.0 22.0 23.5 19.0 44.2 22.0 11.8 37.0
70th %ile Term Code Gap Gap Max Max Hold Max Hold Max Gap Max
50th %ile Green (s) 10.3 11.4 17.9 20.8 21.9 17.9 45.2 20.8 9.7 37.0
50th %ile Term Code Gap Gap Gap Gap Hold Gap Hold Gap Gap Max
30th %ile Green (s) 8.7 9.4 14.1 18.1 18.8 14.1 42.8 18.1 8.3 37.0
30th %ile Term Code Gap Gap Gap Gap Hold Gap Hold Gap Gap Max
10th %ile Green (s) 6.7 6.9 9.7 13.4 13.6 9.7 36.6 13.4 6.7 33.6
10th %ile Term Code Gap Gap Gap Gap Hold Gap Hold Gap Gap Gap
Intersection Summary
Cycle Length: 120
Actuated Cycle Length: 106.9
Control Type: Actuated-Uncoordinated
90th %ile Actuated Cycle: 118.1
70th %ile Actuated Cycle: 115.3
50th %ile Actuated Cycle: 111.1
30th %ile Actuated Cycle: 102.6
10th %ile Actuated Cycle: 87.6
Queues PM 2028 Build w Mitigation
3: SC 6 & Industrial Dr/Glassmaster Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT
Lane Group Flow (vph) 110 101 293 563 233 263 1037 346 138 1071
v/c Ratio 0.35 0.52 0.54 0.64 0.67 0.80 0.74 0.31 0.52 0.89
Control Delay 28.7 56.7 25.6 31.9 48.7 44.9 33.1 1.9 21.3 44.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 28.7 56.7 25.6 31.9 48.7 44.9 33.1 1.9 21.3 44.9
Queue Length 50th (ft) 55 70 121 161 144 126 321 0 46 381
Queue Length 95th (ft) 98 127 208 213 239 #257 469 38 90 #567
Internal Link Dist (ft) 665 963 493 629
Turn Bay Length (ft) 150 325 200 300 200
Base Capacity (vph) 427 316 594 962 393 386 1431 1161 346 1232
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.26 0.32 0.49 0.59 0.59 0.68 0.72 0.30 0.40 0.87
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
HCM 6th Signalized Intersection Summary PM 2028 Build w Mitigation
3: SC 6 & Industrial Dr/Glassmaster Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 99 91 264 507 145 65 237 933 311 124 915 49
Future Volume (veh/h) 99 91 264 507 145 65 237 933 311 124 915 49
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 110 101 293 563 161 72 263 1037 346 138 1017 54
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 358 316 456 922 324 145 302 1348 855 234 1122 60
Arrive On Green 0.06 0.17 0.17 0.16 0.26 0.26 0.12 0.38 0.38 0.07 0.33 0.33
Sat Flow, veh/h 1781 1870 1585 3456 1224 548 1781 3554 1585 1781 3432 182
Grp Volume(v), veh/h 110 101 293 563 0 233 263 1037 346 138 526 545
Grp Sat Flow(s),veh/h/ln 1781 1870 1585 1728 0 1772 1781 1777 1585 1781 1777 1838
Q Serve(g_s), s 4.7 5.0 17.2 13.9 0.0 11.9 10.2 27.2 13.7 5.0 30.2 30.2
Cycle Q Clear(g_c), s 4.7 5.0 17.2 13.9 0.0 11.9 10.2 27.2 13.7 5.0 30.2 30.2
Prop In Lane 1.00 1.00 1.00 0.31 1.00 1.00 1.00 0.10
Lane Grp Cap(c), veh/h 358 316 456 922 0 469 302 1348 855 234 581 600
V/C Ratio(X) 0.31 0.32 0.64 0.61 0.00 0.50 0.87 0.77 0.40 0.59 0.91 0.91
Avail Cap(c_a), veh/h 545 316 456 1083 0 469 408 1369 864 367 618 639
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 26.3 38.9 33.1 28.8 0.0 33.1 24.7 28.9 14.4 23.1 34.3 34.3
Incr Delay (d2), s/veh 0.5 0.6 3.1 0.8 0.0 0.8 14.3 2.7 0.3 2.4 16.6 16.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.0 2.3 6.7 5.6 0.0 5.0 5.2 11.3 4.5 2.1 14.9 15.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 26.7 39.4 36.2 29.5 0.0 34.0 39.0 31.6 14.7 25.5 50.9 50.5
LnGrp LOS C D D C A C D C B C D D
Approach Vol, veh/h 504 796 1646 1209
Approach Delay, s/veh 34.8 30.8 29.3 47.8
Approach LOS C C C D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 18.6 40.8 12.9 34.2 13.0 46.4 23.0 24.0
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 19.0 37.0 18.0 22.0 15.0 41.0 22.0 18.0
Max Q Clear Time (g_c+I1), s 12.2 32.2 6.7 13.9 7.0 29.2 15.9 19.2
Green Ext Time (p_c), s 0.4 2.6 0.2 0.7 0.2 6.1 1.1 0.0
Intersection Summary
HCM 6th Ctrl Delay 35.6
HCM 6th LOS D
HCM 6th TWSC PM 2028 Build w Mitigation
6: Glassmaster Rd & Bruner Rd
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Int Delay, s/veh 2.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 466 68 28 661 61 23
Future Vol, veh/h 466 68 28 661 61 23
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 150 - 100 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 518 76 31 734 68 26
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 594 0 1352 556
Stage 1 - - - - 556 -
Stage 2 - - - - 796 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 982 - 165 531
Stage 1 - - - - 574 -
Stage 2 - - - - 444 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 982 - 160 531
Mov Cap-2 Maneuver - - - - 160 -
Stage 1 - - - - 574 -
Stage 2 - - - - 430 -
Approach EB WB NB
HCM Control Delay, s 0 0.4 34.6
HCM LOS D
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 160 531 - - 982 -
HCM Lane V/C Ratio 0.424 0.048 - - 0.032 -
HCM Control Delay (s) 43.1 12.1 - - 8.8 -
HCM Lane LOS E B - - A -
HCM 95th %tile Q(veh) 1.9 0.2 - - 0.1 -
HCM 6th TWSC PM 2028 Build w Mitigation
9: Bruner Rd & School Access
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Int Delay, s/veh 12.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 526 20 14 0 0 668
Future Vol, veh/h 526 20 14 0 0 668
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 100 - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 584 22 16 0 0 742
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 16 0 - 0 1206 16
Stage 1 - - - - 16 -
Stage 2 - - - - 1190 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1602 - - - 203 1063
Stage 1 - - - - 1007 -
Stage 2 - - - - 289 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1602 - - - 129 1063
Mov Cap-2 Maneuver - - - - 129 -
Stage 1 - - - - 639 -
Stage 2 - - - - 289 -
Approach EB WB SB
HCM Control Delay, s 8.2 0 15.8
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1602 - - - 1063
HCM Lane V/C Ratio 0.365 - - - 0.698
HCM Control Delay (s) 8.5 - - - 15.8
HCM Lane LOS A - - - C
HCM 95th %tile Q(veh) 1.7 - - - 6
HCM 6th TWSC PM 2028 Build w Mitigation
10: SC 6 & Innovation Pl
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Int Delay, s/veh 5.1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 117 261 979 146 31 1017
Future Vol, veh/h 117 261 979 146 31 1017
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 100 - 100 25 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 130 290 1088 162 34 1130
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1721 544 0 0 1250 0
Stage 1 1088 - - - - -
Stage 2 633 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver ~ 80 483 - - 553 -
Stage 1 284 - - - - -
Stage 2 491 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 75 483 - - 553 -
Mov Cap-2 Maneuver 192 - - - - -
Stage 1 284 - - - - -
Stage 2 461 - - - - -
Approach WB NB SB
HCM Control Delay, s 33.2 0 0.4
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 192 483 553 -
HCM Lane V/C Ratio - - 0.677 0.6 0.062 -
HCM Control Delay (s) - - 55.9 23 11.9 -
HCM Lane LOS - - F C B -
HCM 95th %tile Q(veh) - - 4.1 3.9 0.2 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 6th Roundabout PM 2028 Build w Mitigation
11: School Access & Innov.Pl Connector
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Intersection Delay, s/veh 5.6
Intersection LOS A
Approach EB NB SB
Entry Lanes 1 1 1
Conflicting Circle Lanes 1 1 1
Adj Approach Flow, veh/h 63 385 491
Demand Flow Rate, veh/h 64 392 501
Vehicles Circulating, veh/h 345 10 14
Vehicles Exiting, veh/h 170 399 388
Ped Vol Crossing Leg, #/h 0 0 0
Ped Cap Adj 1.000 1.000 1.000
Approach Delay, s/veh 4.4 5.2 6.1
Approach LOS A A A
Lane Left Left Left
Designated Moves LR LT TR
Assumed Moves LR LT TR
RT Channelized
Lane Util 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976
Entry Flow, veh/h 64 392 501
Cap Entry Lane, veh/h 971 1366 1360
Entry HV Adj Factor 0.984 0.981 0.981
Flow Entry, veh/h 63 385 491
Cap Entry, veh/h 955 1340 1334
V/C Ratio 0.066 0.287 0.368
Control Delay, s/veh 4.4 5.2 6.1
LOS A A A
95th %tile Queue, veh 0 1 2
HCM 6th TWSC PM 2028 Build w Mitigation
12: Innovation Pl & Innov.Pl Connector & Internal School Access
04/21/2026
213790 ALA Academy Lexington SC Charter School TIA 2028 Build Conditions w Mitigation.syn Synchro 11 Report
Intersection
Int Delay, s/veh 9.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 168 9 0 0 192 53 0 0 0 83 2 186
Future Vol, veh/h 168 9 0 0 192 53 0 0 0 83 2 186
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 187 10 0 0 213 59 0 0 0 92 2 207
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 272 0 0 10 0 0 731 656 10 627 627 243
Stage 1 - - - - - - 384 384 - 243 243 -
Stage 2 - - - - - - 347 272 - 384 384 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1291 - - 1610 - - 337 385 1071 396 400 796
Stage 1 - - - - - - 639 611 - 761 705 -
Stage 2 - - - - - - 669 685 - 639 611 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1291 - - 1610 - - 220 329 1071 352 342 796
Mov Cap-2 Maneuver - - - - - - 220 329 - 352 342 -
Stage 1 - - - - - - 546 522 - 650 705 -
Stage 2 - - - - - - 494 685 - 546 522 -
Approach EB WB NB SB
HCM Control Delay, s 7.8 0 0 18.2
HCM LOS A C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1291 - - 1610 - - 570
HCM Lane V/C Ratio - 0.145 - - - - - 0.528
HCM Control Delay (s) 0 8.3 0 - 0 - - 18.2
HCM Lane LOS A A A - A - - C
HCM 95th %tile Q(veh) - 0.5 - - 0 - - 3.1
Appendix D Turn Lane Graphs
Bruner at S-626 AM Ex
Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection.
2-lane roadway (English)
INPUT
Value
30
25%
405
610
OUTPUT
Value
231
CALIBRATION CONSTANTS
Value
3.0
5.0
1.9
Variable
85
th percentile speed, mph:
Percent of left-turns in advancing volume (V A), %:
Advancing volume (V A), veh/h:
Opposing volume (V O), veh/h:
Variable
Average time for left-turn vehicle to clear the advancing lane, s:
Limiting advancing volume (V A), veh/h:
Guidance for determining the need for a major-road left-turn bay:
Left-turn treatment warranted.
Variable
Average time for making left-turn, s:
Critical headway, s:
0
100
200
300
400
500
600
700
800
0 100 200 300 400 500 600 700
Opposing Volume (V O), veh/h
Advancing Volume (V A), veh/h
Left-turn treatment
warranted.
Left-turn
treatment
not
Bruner at S-626 AM Bkgnd
Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection.
2-lane roadway (English)
INPUT
Value
30
5%
430
628
OUTPUT
Value
463
CALIBRATION CONSTANTS
Value
3.0
5.0
1.9
Variable
85
th percentile speed, mph:
Percent of left-turns in advancing volume (V A), %:
Advancing volume (V A), veh/h:
Opposing volume (V O), veh/h:
Variable
Average time for left-turn vehicle to clear the advancing lane, s:
Limiting advancing volume (V A), veh/h:
Guidance for determining the need for a major-road left-turn bay:
Left-turn treatment NOT warranted.
Variable
Average time for making left-turn, s:
Critical headway, s:
0
100
200
300
400
500
600
700
800
0 100 200 300 400 500 600 700
Opposing Volume (V O), veh/h
Advancing Volume (V A), veh/h
Left-turn treatment
warranted.
Left-turn
treatment
not
Bruner at S-626 AM Build
Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection.
2-lane roadway (English)
INPUT
Value
30
4%
639
1065
OUTPUT
Value
316
CALIBRATION CONSTANTS
Value
3.0
5.0
1.9
Variable
85
th percentile speed, mph:
Percent of left-turns in advancing volume (V A), %:
Advancing volume (V A), veh/h:
Opposing volume (V O), veh/h:
Variable
Average time for left-turn vehicle to clear the advancing lane, s:
Limiting advancing volume (V A), veh/h:
Guidance for determining the need for a major-road left-turn bay:
Left-turn treatment warranted.
Variable
Average time for making left-turn, s:
Critical headway, s:
0
100
200
300
400
500
600
700
800
0 100 200 300 400 500 600 700
Opposing Volume (V O), veh/h
Advancing Volume (V A), veh/h
Left-turn treatment
warranted.
Left-turn
treatment
not
Bruner at S-626 PM Ex
Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection.
2-lane roadway (English)
INPUT
Value
30
17%
363
328
OUTPUT
Value
352
CALIBRATION CONSTANTS
Value
3.0
5.0
1.9 Average time for left-turn vehicle to clear the advancing lane, s:
Limiting advancing volume (V
A), veh/h:
Guidance for determining the need for a major-road left-turn bay:
Left-turn treatment warranted.
Variable
Average time for making left-turn, s:
Critical headway, s:
Variable
85 th percentile speed, mph:
Percent of left-turns in advancing volume (V A), %:
Advancing volume (V A), veh/h:
Opposing volume (V O), veh/h:
Variable
0
100
200
300
400
500
600
700
800
0 100 200 300 400 500 600 700
Opposing Volume (V O), veh/h
Advancing Volume (V A), veh/h
Left-turn treatment
warranted.
Left-turn
treatment
not
Bruner at S-626 PM Bkgnd
Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection.
2-lane roadway (English)
INPUT
Value
30
5%
430
338
OUTPUT
Value
626
CALIBRATION CONSTANTS
Value
3.0
5.0
1.9 Average time for left-turn vehicle to clear the advancing lane, s:
Limiting advancing volume (V
A), veh/h:
Guidance for determining the need for a major-road left-turn bay:
Left-turn treatment NOT warranted.
Variable
Average time for making left-turn, s:
Critical headway, s:
Variable
85 th percentile speed, mph:
Percent of left-turns in advancing volume (V A), %:
Advancing volume (V A), veh/h:
Opposing volume (V O), veh/h:
Variable
0
100
200
300
400
500
600
700
800
0 100 200 300 400 500 600 700
Opposing Volume (V O), veh/h
Advancing Volume (V A), veh/h
Left-turn treatment
warranted.
Left-turn
treatment
not
Bruner at S-626 PM Build
Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection.
2-lane roadway (English)
INPUT
Value
30
4%
689
534
OUTPUT
Value
544
CALIBRATION CONSTANTS
Value
3.0
5.0
1.9 Average time for left-turn vehicle to clear the advancing lane, s:
Limiting advancing volume (V
A), veh/h:
Guidance for determining the need for a major-road left-turn bay:
Left-turn treatment warranted.
Variable
Average time for making left-turn, s:
Critical headway, s:
Variable
85 th percentile speed, mph:
Percent of left-turns in advancing volume (V A), %:
Advancing volume (V A), veh/h:
Opposing volume (V O), veh/h:
Variable
0
100
200
300
400
500
600
700
800
0 100 200 300 400 500 600 700
Opposing Volume (V O), veh/h
Advancing Volume (V A), veh/h
Left-turn treatment
warranted.
Left-turn
treatment
not
Bruner at Sch Acc AM Build
Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection.
2-lane roadway (English)
INPUT
Value
30
98%
1045
19
OUTPUT
Value
1389
CALIBRATION CONSTANTS
Value
3.0
5.0
1.9 Average time for left-turn vehicle to clear the advancing lane, s:
Limiting advancing volume (V
A), veh/h:
Guidance for determining the need for a major-road left-turn bay:
Left-turn treatment NOT warranted.
Variable
Average time for making left-turn, s:
Critical headway, s:
Variable
85 th percentile speed, mph:
Percent of left-turns in advancing volume (V A), %:
Advancing volume (V A), veh/h:
Opposing volume (V O), veh/h:
Variable
0
100
200
300
400
500
600
700
800
0 100 200 300 400 500 600 700
Opposing Volume (V O), veh/h
Advancing Volume (V A), veh/h
Left-turn treatment
warranted.
Left-turn
treatment
not
Bruner at Sch Acc PM Build
Figure 2 - 5. Guideline for determining the need for a major-road left-turn bay at a two-way stop-controlled intersection.
2-lane roadway (English)
INPUT
Value
30
96%
546
14
OUTPUT
Value
1019
CALIBRATION CONSTANTS
Value
3.0
5.0
1.9 Average time for left-turn vehicle to clear the advancing lane, s:
Limiting advancing volume (V
A), veh/h:
Guidance for determining the need for a major-road left-turn bay:
Left-turn treatment NOT warranted.
Variable
Average time for making left-turn, s:
Critical headway, s:
Variable
85 th percentile speed, mph:
Percent of left-turns in advancing volume (V A), %:
Advancing volume (V A), veh/h:
Opposing volume (V O), veh/h:
Variable
0
100
200
300
400
500
600
700
800
0 100 200 300 400 500 600 700
Opposing Volume (V O), veh/h
Advancing Volume (V A), veh/h
Left-turn treatment
warranted.
Left-turn
treatment
not
/0 /1 /2 /3 /4 □ /6 /7 /8 /9 □ /10 /11 /12 /13 /14 /15 /13 /16 /12 /10 /17 /11 /15 □ /18 /19 /20 /21 /22□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
/24 /25 /26 /27 /28 □ /29 /30 /31 /32 /33 /27 □ /30 /34 □ /25 /35 /36 /37 □ /38 /39 /39 /36 /30 /40 /38 /41 /36 /27 □ /25 /35 □ /42 /30 /31 /42 /43 /38 /37 /34 □ /43 /30 /26 /42 □ /38 □/44 /27 /34 /30 /31 /35 □ /34 /39 /27 /27 /44 □ /25 /45 □ /46 /47 □ /48 /30 /36 /27 /34 □ /39 /27 /33 □ /42 /25 /32 /33 □ /25 /33 □
/31 /33 /27 /38 /26 /27 /33 /49 □
□
□
□
□
□
□
□
□
□
□
□
□
□
/50 /51 /52 /53 /54 /55 /52 /56 /54 /57 □ /59 /60 /61 □ /61 /52 /50 /62 /63 /64 /63 /51 /61 /56 □ /55 /65 /56 /54 /57 □ /65 /63 □ /51 /56 /57 /52 /50 /56 /65 /55 /52 /66 /54 /53 □ /52 /56 /63/54 /61 /57 /54 /67 /63 /52 /60 /56 /57 □
/60 /56 □ /59 /60 /51 /61 /64 /55 /65 /56 /54 □ /62 /52 /50 /62 /68/65 /69 /57 □
/59 /70 /71 /72 /73 /74 □ /75 /76 /77 /64 /78 □
NEW BUSINESS # 3
TO: Planning Commission
FROM: Jessica Lybrand, Director of Planning and Building
SUBJECT: Amendment to Approved Traffic Mitigation Plan at Preserves at
Cherokee Trail
DATE: May 20, 2026
BACKGROUND: The Preserves at Cherokee Trail subdivision, consisting of 62 residential lots,
received approval in August 2024. As part of the approved plans, token right -turn lanes were
proposed at each of the development access points along Cherokee Trail as traffic mitigation
measures associated with the project.
Subsequent to approval, the South Carolina Department of Transportation (SCDOT) reviewed the
proposed improvements and denied the installation of the token right-turn lanes. SCDOT requested
that alternative traffic mitigation measures be considered.
Following discussions between the applicant and Town Staff, it was determined that the
installation of a northbound right-turn lane at the intersection of Old Cherokee Road and Cherokee
Trail would satisfy the project’s traffic mitigation requirements.
ACTION REQUESTED: Approval of the Alternate Traffic Mitigation
GRADING & STORMDRAINAGE PLAN
C8
REVISIONSDESCRIPTIONDATE
PROJECT
#SHEET
LEXINGTON, SC
LEXINGTON COUNTYCOMMENTS08/15/251 TOWN COMMENTS02/19/262
PROJ NO: 24015
3 DAYS BEFORE DIGGING IN
SOUTH CAROLINA
Palmetto Utility Protection Service
CALL 811
"SUPERIOR COMPREHENSIVEENGINEERING SOLUTIONS"WWW.4DENGR.COMCIVIL ENGINEERING
PRESERVES AT CHEROKEE TRAILSCALE: 1"=60'
OCTOBER 10, 2024
08/15/2025
Source: Town of Lexington website. First collected Oct 13, 2026.