RecordWell Data

Planning Commission Meeting - April 22, 2026

Town of Lexington · Lexington County · meeting of Apr 22, 2026 · Agendas

Open the original document More from Town of Lexington

This document is no longer listed on Town of Lexington's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

REGULAR PLANNING COMMISSION MEETING Council Chambers 111 Maiden Lane, Lexington, SC April 22, 2026 If you wish to speak at the meeting, please be sure to sign up in advance. AGENDA 7:30AM BREAKFAST – ELI MACK 8:00AM OPENING STATEMENT INVOCATION PLEDGE OF ALLEGIANCE CALL TO ORDER DELETIONS ON AGENDA APPROVAL OF MINUTES 1. Work Session Planning Commission Meeting March 17, 2026 2. Regular Planning Commission Meeting March 18, 2026 NEW BUSINESS ITEMS 1. Impact Fee Update – Phase 2 ADJOURNMENT MINUTES TOWN OF LEXINGTON PLANNING COMMISSION WORK SESSION March 17, 2026 The Planning Commission met on March 17, 2026, at 6:00 pm in the Council Chambers at Town Hall, 111 Maiden Lane, Lexington, South Carolina. The meeting was attended by Chair Frank Berry, Vice-Chairman Jarett Harrelson, Commissioners Roscoe Caughman, Jamie Fite, Brian Amick, and Betsy McCall. Commissioners Joe Robertson, JT Stephenson, and Sammy Hendrix were absent. A quorum was met. Others in attendance were: Transportation Director Randy Edwards, Planning and Building Director Jessica Lybrand , Digital Media Coordinator Michael Tolbert, and Assistant Town Administrator Kevin Richardson. There were five (5) citizens present, and no one from the news media was present. CALL TO ORDER: Chairman Berry called the meeting to order and welcomed those in attendance. He noted the informal nature of work sessions and explained that public comments would be taken during the regular Planning Commission meeting scheduled for the next morning, and reiterated that you must sign up in advance. NEW BUSINESS: 1. Annexation of Lexington County Tax Map #004300- 07-162, -031, -133 1100 Block of West Main Street- Planning Director Lybrand stated that Items One and Two on the agenda would be presented together, as they are related, and that discussion would follow the presentation. She explained that Satcher Properties, LLC owns approximately 29.31 acres located on W. Main Street and Highway 378 and has petitioned to annex the property into the Town. A car dealership and commercial center are proposed for development on the site. Surrounding properties within the Town are zoned General Commercial, Office Commercial, High Density Residential, and Protected Residential. W. Main Street and Highway 378 are classified as arterial roads. The Future Land Use Map designates the property as a Regional Node Area. The Comprehensive Land Use Plan describes this area as appropriate for medium - to high- intensity commercial, retail, hospitality (primarily regional or national brands), and office uses serving major corridors. She noted that, for the proposed project to comply with the Zoning Ordinance, the property should be zoned General Commercial and the adjacent roadways classified as arterial roads. 2. Sketch Plan Approval of Proposed Car Dealership and Commercial Center in the 1100 Block of W Main St- Planning Director Lybrand presented a request for Sketch Plan approval for a proposed automobile dealership and future commercial development located along West Main Street and Highway 378. Copies of the sketch plan were included in the meeting packet. MINUTES PC WORK SESSION March 17,2026 2 She explained the development is proposed as a phased commercial project. Phase One includes construction of an approximately 48,000-square-foot automobile dealership facility, including showroom, service areas, vehicle display, and associated parking. The remainder of the property is shown conceptually as future commercial outparcels intended for retail or service-oriented uses. These areas are illustrated as conceptual development blocks to maintain flexibility for future tenants and site configuration. Ms. Lybrand stated that the layout incorporates setbacks and buffering consistent with the Town’s zoning standards, including a preservation corridor buffer and enhanced buffering adjacent to nearby residential areas. She noted that the sketch plan establi shes the overall development concept and site organization, and that detailed design elements—including final building locations, internal circulation, landscaping, architecture, and utilities —will be evaluated during subsequent site plan and engineering review by Town staff. She further explained that access for Phase One is proposed from West Main Street and Highway 378. The development includes a proposed right -in/right-out access serving the dealership, with potential for left-in movements subject to SCDOT spacing requirements. The plan also includes channelization improvements, such as a median or island, to prevent last - minute lane shifts and improve traffic safety. A Traffic Impact Study (TIS) is currently underway and will help determine final access configuration and any necessary roadway improvements. Access for Phase Two will be reevaluated once future tenants are identified and detailed site plans are submitted. Vice Chair Harrelson asked about the status of the Traffic Impact Study. Ms. Lybrand stated that Transportation Director Randy Edwards was en route to the meeting and would address traffic-related questions, along with the applicant. Chairman Berry asked whether a full access point had been discussed. Jamie Pruitt of Cox and Dinkins, civil engineer for the project, stated that the only proposed full-service entrance would be the westernmost driveway shown on the site plan. He noted ongoing discussions with Mr. Edwards and SCDOT regarding a potential left -in movement from the existing median. Chairman Berry asked about the location of a future signal. Mr. Pruitt stated that discussions have referenced an area past Burger King. Mr. Edwards stated that additional discussion regarding the Long- Term Improvement Plan (LTIP) would occur at the regular meeting. He explained that a project is currently designed to make changes to the intersection, and that Phase One would not have the same level of traffic impact as future phases. He noted that SCDOT coordination would be critical in determining final access, and that staff supports placing the right -in access as far east as possible on the sketch plan, subject to SCDOT approval. Commissioner Amick asked about the anticipated timeline for the intersection redesign. Mr. Edwards stated the project is currently in design and could potentially be completed in 2027, though roadway project timelines can vary. MINUTES PC WORK SESSION March 17,2026 3 Commissioner Amick expressed interest in reviewing the Traffic Impact Study before making a decision and noted existing traffic backups along Highway 378. Mr. Edwards responded that traffic management involves multiple components, including adaptive signalization and adequate vehicle queuing space. He also noted that improvements at Gibson Road and Highway 378 are anticipated to occur concurrently, including a true dual left -turn configuration. Chairman Berry asked the applicant about the anticipated project timeline. The applicant stated the projected completion timeframe is approximately mid-2027. Vice Chair Harrelson commented that car dealerships are not typically heavy traffic generators. Mr. Edwards agreed that Phases Two and Three would generate greater traffic impacts and noted that those phases are not currently under review. He added that the applicant is aware that all requirements must be met. Vice Chair Harrelson noted there is an existing dealership across the intersection. Commissioner Amick asked whether Phase One would operate solely as right -in/right-out access. Mr. Edwards stated that is what has been proposed. Commissioner Amick asked whether vehicles traveling back toward Town would need to make a U -turn. Mr. Edwards stated the applicant has been advised that a driveway may need to be positioned far enough west to allow safe left -out movements, and that right -out movements are more challenging but can typically be accommodated in planned developments. Commissioner Amick asked whether connectivity would be provided. Mr. Edwards confirmed that connectivity is anticipated. The applicant added that the development would also connect to Topsider Road, as shown on the sketch plan, with access gated when the dealership is closed. Items 3-5: Ms. Lybrand noted that Items Three and Four were both related to Item Five, as a land swap is proposed in connection with the Planned Unit Development Overlay (PUD). She stated she would proceed directly into the detailed PUD background, which encompasses all three listed items, including the rezoning. 3. Recommendation on Rezoning from High-Density Residential to High-Density Residential and Limited Commercial with a Planned Unit Development Overlay on Lexington County Tax Map Number 004300-07-153 and -024, located at 201 Old Chapin Road. 4. Recommendation on Rezoning from Limited Commercial to High Density Residential with a Planned Unit Development Overlay on the Lexington County Tax Map Number 004323-02-001 Located at 100 Snelgrove Road 5. Approval of a Planned Unit Development Consisting of a 51 Unit Townhome Project that will include .80 acres of Limited Commercial Office Space- Ms. Lybrand presented detailed background for the proposed Planned Unit Development (PUD) Overlay she presented that Connelly Development requested site plan approval for a PUD consisting of 50 townhomes on 9.43 acres and 0.80 acres of commercial office space located at the corner of Old Chapin Road and Snelgrove Road, with primary access from Old Chapin Road. Inter nal MINUTES PC WORK SESSION March 17,2026 4 streets would be privately maintained. Details and the sketch plan were included in the meeting packet. The proposal would redevelop the existing 30-unit apartment complex and the vacant former Jaycee Hut building, reducing density from a previously approved 104 units to 50 units. She noted land disturbance permits were obtained in 2022, and they are good for five years. Buffers and setbacks were consistent with prior Board of Zoning Appeals approvals, with modifications to front and side buffers, parking standards, and façade articulation. Rear setbacks adjacent to the single-family neighborhood would meet ordinance requirements. Ms. Lybrand stated the development met the Town’s mixed- use zoning criteria, including location, zoning district, road classification, compatibility of uses, parking, height, pedestrian access, and delivery restrictions (7:00 AM – 7:00 PM) (as presented in the attached packet). She further explained that the PUD would include transportation, architectural, and appearance standards. If approved, the PUD document would require review by the Planning Commission and two readings and a public hearing before the Town Council. Any future changes to the approved PUD document would require going back through the same review process. It was noted that we have not had many PUD ’s in a while , so she confirmed the process. Commissioner Amick asked what would happen to the previously approved 104 -unit development if the PUD were approved by the Town Council. Ms. Lybrand explained that the PUD would supersede prior approvals, and development could not occur outside of the approved PUD document without additional approval and reasonable cause. Chairman Berry noted the driveway alignment appeared to match the driveway across the street and asked whether that would assist with traffic flow. Mr. Edwards stated the original traffic plan would require a left -turn lane. He explained that access would occur at a single drive from Old Chapin Road and that roadway improvements would include widening to three lanes extending toward the development before tapering. He added that traffic mitigation measures were incorporated as part of the inclusion of the S nelgrove parcel and Sandpiper development. Vice Chair Harrelson said the reduced density also reduces traffic. Mr. Edwards confirmed. Chairman Berry asked whether the units would be two stories. Mr. Kevin Connelly (applicant/developer) confirmed that it would be two-story units and stated that parking met Town standards for both commercial and residential components. Chairman Berry asked about the western boundary near the detention pond and whether 150 feet would remain a natural area. Mr. Connelly stated there would be a 100- foot buffer, and approximately 40 feet of wooded area would remain undisturbed; the previous proposal only had 15 feet. He noted the stormwater basin would be brought up to County standards as well. Chairman Berry inquired about the proposed architectural standards. Ms. Lybrand explained that the townhomes would meet ordinance requirements for façade variation, including the required two -foot variation. She noted the design would maintain a consistent primary MINUTES PC WORK SESSION March 17,2026 5 roofline and that there are limited additional architectural requirements applicable to townhomes within the PUD. Chairman Berry asked whether the parking areas and pedestrian paths would be maintained by a homeowners' association (HOA). Mr. Connelly stated that the apartment community would maintain those areas. He noted that his primary office is located adjacent to the development and that, although the site presents development challenges, he is committed to improving the property. He added that roadway improvements along the Old Chapin Road access points would also improve the Snelgrove Road area near the Jaycee Hut. Chairman Berry clarified that the detention pond would remain under the responsibility of the apartment ownership. He noted that while there is not technically an HOA, Mr. Connelly owns the property, and tenants would lease the townhomes. Mr. Connelly added that he has owned and managed similar properties in Town for over 15 years. Commissioner Fite asked how many residents currently occupy the apartments on the site. Mr. Connelly stated that one building burned in 2019 and was not rebuilt, leaving 24 units remaining, of which 19 are currently occupied. Commissioner McCall asked whether the development qualified as affordable housing. Mr. Connelly responded that the existing units were affordable. Ms. Lybrand interjected that State law does not permit the Commission to inquire further into that line of questioning. Commissioner McCall asked whether the proposed setbacks met ordinance standards or were simply compatible. Mr. Connelly stated the development met requirements along the sides adjacent to commercial properties. Commissioner McCall asked whether a variance would be required. Ms. Lybrand explained that under a PUD, a separate variance is not required, as modifications are incorporated within the PUD approval. She noted the property had previously received similar setback approvals through the Board of Zoning Appeals (BZA). Vice Chair Harrelson commented that the setbacks had essentially already been approved. Chairman Berry asked about the limited commercial component. Ms. Lybrand explained it would consist of a neighborhood- style limited commercial use with specific limitations and noted that the zoning across the street is also Limited Commercial. Commissioner Amick asked whether additional parking could be added if commercial use required more than initially planned. Mr. Connelly stated that, in coordination with the adjacent property owner, additional parking could be provided if necessary. Chairm an Berry noted that office uses typically require one space per 300 square feet and that the proposed parking appeared to meet or exceed ordinance standards. Ms. Lybrand added that zoning limitations would restrict uses to those generally compatible with the available parking. Mr. Connelly expressed his commitment to redeveloping the property, which is currently in disrepair, and stated that the project would improve the area while meeting traffic mitigation requirements. He acknowledged the parcel presents challenges but stated his intent to be a positive addition to the community. MINUTES PC WORK SESSION March 17,2026 6 Chairman Berry asked about the anticipated construction timeline. Mr. Connelly estimated construction would likely begin within approximately two years, potentially around 2028, with approximately one year for the permitting process, followed by one year of construction. Announcements: Ms. Lybrand announced that the third- party consultant for the Sign Ordinance update would hold stakeholder meetings the week of March 30. Invitations would be distributed, and she encouraged the public to sign up for alerts and provide feedback regarding signage within Town limits. ADJOURNMENT: Vice Chair Harrelson made a motion to adjourn the meeting, with no objections . Chair Berry adjourned the meeting without objection at 6:31 pm. Respectfully Submitted, __________________________ Laura Hinson Municipal Clerk APPROVED: ______________________ Chairman Frank Berry FOIA COMPLIANCE – Public notification of this meeting was published, posted, and mailed in compliance with the Freedom of Information Act and the Town of Lexington requirement. MINUTES TOWN OF LEXINGTON REGULAR PLANNING COMMISSION MEETING March 18, 2026 The Planning Commission met on March 18, 2026, at 8:00 a.m. in the Council Chambers at Town Hall, 111 Maiden Lane, Lexington, South Carolina . The meeting was attended by Chairman Frank Berry, Commissioners Jamie Fite, Roscoe Caughman, Brian Amick, JT Stephenson, and Betsy McCall. Vice Chair Jarrett Harrelson, and Commissioners Sammy Hendrix and Joe Roberston were absent. A quorum was met. Others in attendance were Planning and Building Director Jessica Lybrand, Transportation Director Randy Edwards, Special Funds Manager Vanessa Stoquert, Economic Developer Jack Stuart, Public Information Office Laurin Barnes, Digital Media Coordinator Michael Tolbert, Town Attorney David Epperson (Parker Poe), Councilmember Ron Williams, Councilmember Gavin Smith, and Municipal Clerk Laura Hinson. There were four (4) citizens present, and none from the news media. CALL TO ORDER, INVOCATION & PLEDGE: Chairman Berry called the meeting to order and welcomed those in attendance, noting the meeting was available for public viewing on the Town of Lexington YouTube channel. He reminded speakers wishing to address agenda items to sign up prior to the meeting and indicate residency status. Planning Commission members introduced themselves, Commissioner Fite offered the invocation, and all joined in the Pledge of Allegiance. DELETIONS TO AGENDA: None APPROVAL OF MINUTES: Commissioner Stephens made a motion to approve the minutes as submitted for the November 19, 2025, regular Planning Commission meeting. Commissioner Amick seconded the approval. The motion carried unanimously. 6 in favor/ 0 opposed/ 3 absent PRESENTATIONS: (due to technical issues, the order of presentations was changed in the meeting) 1. LTIP 2.0 Transportation Director Randy Edwards - Mr. Randy Edwards, Transportation Director, presented the updated Lo cal Transportation Improvement Plan Second Edition(LTIP 2.0). He explained that the original LTIP was created in 2017 and that this second edition is intended to serve as a guide for addressing growth and transportation impacts throughout Town. The updated plan establishes a defined study area and evaluat es roadway segments and intersections within that area. Mr. Edwards stated that approximately 100 intersections were initially reviewed using adopted evaluation criteria, which were previously approved by Council. The ranking methodology includes Level of Service (50% weight), growth rate projections (30%), cra sh data (15%), and Average Daily Traffic (5%). Growth trends over the past ten years were analyzed and projected forward to account for anticipated development impacts. Existing or MINUTES REGULAR TOWN PLANNING COMMISSION March 18, 2026 2 previously committed projects were removed from consideration to focus funding on additional priority locations. The list was ultimately refined to approximately 30 priority intersections. He noted that recommended improvements primarily focus on operational efficiency, including auxiliary and extended turn lanes, signal modifications, access management strategies, intersection redesigns, and, in some cases, roundabouts. The plan also identi fies potential connector roads and minor roadway extensions to improve network connectivity and reduce congestion on major corridors. Each priority project includes a preliminary budget estimate intended as a planning -level guide for future funding discuss ions, including the potential use of impact fees. Mr. Edwards emphasized that LTIP 2.0 is a reference and planning tool to support decision- making and is not a substitute for detailed traffic studies required with future development proposals. He described the document as a living plan that will require updates at least every five years. The purpose of the update is to preserve and maximize the Town’s existing transportation investments while planning for continued growth. He noted that the final document will be made available online as an interactive resource. No action was required by the Planning Commission. A copy of the LTIP 2.0 presentation is attached to these minutes 2. Staff Update and Overview of FY 2025 Impact Fees- Ms. Vanessa Stoquert, Special Funds Manager, presented the Town’s Fiscal Year 2025 Development Impact Fee Report. She explained that the report is required annually under South Carolina law and details how impact fees are collected, maintained, and programmed to support growth-related infrastructure. She noted that impact fees are restricted funds used solely for capacity -expanding capital improvements serving new development and must be expended within stat utory timeframes or be subject to refund provisions. She also stated that the Capital Improvements Plan, from which projects are derived, is reviewed by the Planning Commission at least every five years. Ms. Stoquert provided an overview of Transportation, Parks and Recreation, and Municipal Facilities and Equipment impact fee accounts, including FY 2025 revenues, expenditures, fund balances, and projected revenues and expenditures through FY 2029. She highlighted major funded projects, including the Gibson Road and West Main intersection improvements, Mill Pond Park, Virginia Hylton Park improvements, the Bruner Road storage facility, municipal complex improvements, the Signal Shop, and future parks headquarters upgrades. She stated that the Town remains in compliance with state requirements and that impact fees continue to be programmed toward projects supporting anticipated growth. She confirmed that impact fees are collected only on in-town development projects. A copy of the FY 2025 Development Impact Fee Report is attached to these minutes NEW BUSINESS: 1. Annexation of Lexington County Tax Map #004300-07-162, -031, -133 1100 Block of W Main St - Ms. Lybrand reported that Satcher Properties LLC owns approximately 29.31 acres on W Main Street and Highway 378 and has petitioned to annex the property. A car MINUTES REGULAR TOWN PLANNING COMMISSION March 18, 2026 3 dealership and commercial center is planned to be developed on the site. Properties in Town near this one are zoned General Commercial, Office Commercial, High Density Residential, and Protected Residential. W Main Street and Highway 378 are classified as Arterial Roads. The property is shown on the Future Land Use Map as a Regional Node Area. The Comprehensive Land Use Plan describes this area as a node containing medium to high intensity commercial, retail, hospitality businesses (predominantly regional or national brands), and offices that cater to those traveling along major corridors. For the proposed project to be compliant with the zoning ordinance, the properties should be zoned with General Commercial zoning, and W Main Street and Highway 378 should be classified as Arterial Roads. Town Attorney David Epperson noted that while items 1 and 2 are related , each item will need to be voted on and discussed separately. No public signed up to speak on this matter. Commissioner Stephenson made a motion to approve the annexation. Commissioner Fight seconded. All in favor. Motion c arried unanimously. 6 in favor/ 0 opposed/ 3 absent 2. Sketch Plan Approval of Proposed Automobile Dealership and Commercial Center in the 1100 Block of W Main St- Ms. Lybrand presented a Sketch Plan for 156 Hwy 378, LLC for a phased commercial development consisting of an automobile dealership and future commercial outparcels along West Main Street and Highway 378. She stated Phase One includes construction of an approximately 48,000- square-foot automobile dealership with showroom, service areas, and associated vehicle display and parking. She explained that the remainder of the site is shown conceptually for future commercial outparcels intended for retail or service -oriented uses, with final layouts to be determined during future site plan review. The plan incorporates setbacks and bufferi ng consistent with Town standards, including a preservation corridor buffer and enhanced buffering adjacent to nearby residential areas. She noted that detailed site design elements, including circulation, landscaping, architecture, and utilities, will be reviewed during subsequent staff review phases. Ms. Lybrand stated that Phase One access is proposed from West Main Street and US Highway 378, including a right -in/right-out configuration with potential for left -in movements subject to SCDOT spacing requirements. She noted that channelization improvements, such as a median or island, are proposed to improve traffic safety along the corridor. A Traffic Impact Study is currently underway to determine final access design and any required roadway improvements, and access for Phase Two will be reevaluated wit h future development proposals. She added that the proposal is consistent with the Town’s Comprehensive Plan, which designates the property as a Regional Node intended for medium - to high- intensity commercial uses, including retail, office, and hospitality along major travel corridors. MINUTES REGULAR TOWN PLANNING COMMISSION March 18, 2026 4 Ms. Lybrand noted that an in- depth discussion on the matter took place during the work session the previous evening, which is available for public viewing Commissioner Fite made a motion to approve the sketch plan. Commissioner Stephenson seconded. Commissioner Amick asked the applicant’s engineers to confirm that access to Phase One would be right -in/right-out and expressed concern regarding traffic safety. He also asked whether there would be internal connectivity between Phase One and Phase Two al lowing vehicles to travel across the site. Chairman Berry noted that additional access is also available from Topsider Road. Commissioner Amick further requested clarification from Mr. Edwards regarding the SCDOT intersection improvements discussed at the prior work session. The applicant confirmed that Phase One access would be right-in/right-out. Mr. Edwards provided clarification regarding the proposed development’s access and its relationship to planned transportation improvements. He stated that the intersection of Gibson Road, US 1, and US 378 is a Town-funded impact fee project identified through the LTIP as needing level of service improvements. He explained that the proposed site access will be evaluated in coordination with the approved design for that intersection improvement project and will need to be consistent with the final roadway configuration. He noted that the proposed access may requi re additional design refinements not fully depicted on the sketch plan. Mr. Edwards stated that any potential left-turn movements will be subject to SCDOT spacing requirements and applicable review standards. He added that temporary or alternative access configurations may be considered depending on phased development timing a nd safety considerations, including coordination between Phase One and Phase Two circulation. He further noted that the impact fee project is anticipated to begin construction around the first of the year and will include auxiliary lanes, extended turn lanes, and other improvements intended to increase roadway capacity and improve the level of service in the area. Mr. Travis Asbill 104 Beltrees Drive, HOA President of the adjacent neighborhood , expressed concerns regarding stormwater runoff and drainage impacts. He stated that existing runoff from Highway 378 carries debris onto neighborhood property, including areas near a community pond and walking trail, requiring ongoing cleanup efforts. He expressed concern that additional impervious surface could increase stormwater runoff toward the neighborhood and requested assurances that stormwater systems would prevent im pacts to downstream properties and the neighborhood pond. He also referenced prior drainage issues from an existing onsite pond that had affected nearby residential yards. Chairman Berry noted that stormwater management will be reviewed and permitted through the South Carolina Department of Environmental Services and must meet state requirements. Chairman Berry inquired about the anticipated timing of roadway improvements associated with the project. Mr. Edwards stated that coordination with SCDOT District One is ongoing MINUTES REGULAR TOWN PLANNING COMMISSION March 18, 2026 5 and that the current anticipated timeline for improvements is approximately FY 2027, pending approvals. The applicant’s engineer, Mr. Bill Atkins with Pyramid Contractors, stated that construction is anticipated to begin in the late first quarter of 2027. Motion carried unanimously. 6 in favor/ 0 opposed/ 3 absent 3. Rezoning of Lexington County Tax Map #004300- 07-153, -027, 201 Old Chapin Road- Ms. Lybrand presented that Connelly Development submitted a request to rezone 9.63 acres at 201Old Chapin Road from High Density Residential to High Density Residential and Limited Commercial with a Planned Unit Development overlay. The purpose of the request is to support the proposed Planned Unit Development of a 50-unit townhome project that will include .80 acres of Limited Commercial office space fronting on Old Chapin Road. Properties adjacent are zoned High Density Residential, Limited Commercial, an d Protected Residential. Old Chapin Road is classified as a Collector Road. A motion was made by Commissioner Fite to approve the rezoning. Second, by Commissioner Amick. All in favor. Motion carried unanimously. 6 in favor/ 0 opposed/ 3 absent 4. Rezoning of Lexington County Tax Map #004323- 02-001, 100 Snelgrove Road - Ms. Lybrand presented a request from Connelly Development to rezone 0.92 acres at 100 Snelgrove Road from Limited Commercial to High Density Residential with a Planned Unit Development (PUD) overlay. She stated the rezoning would support a proposed 50- unit townhome development with approximately 0.80 acres of Limited Commercial office space fronting Old Chapin Road. She noted that surrounding properties are zoned High Density Residential, Limited Commercial, and Protected Residential, and that Old Chapin Road is classified as a Collector Road while Snelgrove Road is classified as a Limited Local Road. Commissioner Stephenson made a motion to approve the rezoning, seconded by Commissioner Amick. 6 in favor/ 0 opposed/ 3 absent 5. Approval of Planned Unit Development at 201 Old Chapin Road and 100 Snelgrove Road- Director Lybrand presented the first portion of the request, outlining the Planned Unit Development (PUD) standards and applicable zoning criteria. She stated the proposal was evaluated for consistency with the Town’s zoning ordinance for mixed -use development, including appropriate location, zoning support, roadway classification, compatibility of uses, setbacks and buffers, parking, building height, pedestrian access, and delivery restrictions. She noted the project proposes modifications through the PUD process, including reduced front and side setbacks and buffers, modified parking standards eliminating garage requirements, and façade variation achieved through architectural articulation. The rear buffer and setback adjacent to residential property will remain at 100 feet and 150 feet respectively in accordance with the Zoning Ordinance. Connelly Development requested site plan approval for a PUD consisting of 50 townhomes and approximately 0.80 acres of commercial office space at Old Chapin Road and Snelgrove Road. The site includes redevelopment of a 30-unit apartment complex and the former Jaycee Hut building, both of which will be removed. The proposal reduces density from a previously approved but unbuilt 104-unit development to approximately 5.3 dwelling units per acre. MINUTES REGULAR TOWN PLANNING COMMISSION March 18, 2026 6 Primary access will be from Old Chapin Road, with internal private streets maintained by the development. The applicant stated that the project introduces limited neighborhood- scale commercial uses integrated with residential development under a unified site plan. Commissioner Amick made a motion to approve the request, seconded by Commissioner Fite. Chairman Berry noted that the previously approved 104- unit development represented a higher intensity use than the current proposal and therefore , would have generated greater traffic impacts. He stated that the current request represents a net reduction in units and overall intensity. Mr. Edwards confirmed this characterization. Mr. Travis Asbill, 105 Beltrees Drive, HOA President of the adjacent neighborhood, expressed concerns regarding Snelgrove Road, noting it functions as a narrow two-way local road with limited capacity. He requested clarification on whether roadway improvements are included in the project or the impact fee program and how surrounding development contributes to roadway upgrades. Mr. Randy Edwards clarified that the previous 104-unit approval included a required left-turn lane and that the adjacent corner parcel was not previously part of that approval. He stated the current PUD incorporates that parcel, eliminating potential futur e access to Snelgrove Road. He further explained that Snelgrove Road was identified in the LTIP for potential improvement, but priority has been placed on Old Chapin Road due to higher traffic volumes and regional significance. He added that nearby improve ments, including the Sandpiper project, extend along Old Chapin Road but do not reach Snelgrove Road. The current proposal does not include access to Snelgrove Road. Mr. Connelly stated his adjacent office development includes a gated connection to Snelgrove Road intended to discourage cut -through traffic and noted that the roadway experiences limited use for access. He added that he constructed a sidewalk along Snelgr ove Road and that coordinated regional improvements, including Sandpiper -related work, will widen Old Chapin Road near his property. He stated the current development further consolidates access and limits connections to Snelgrove Road while coordinating c irculation with Old Chapin Road improvements. He also acknowledged that easements will be required for roadway widening associated with regional projects. In response to a question from Commissioner Fite about the current residents, Mr. Connelly stated that approximately 19 units are currently occupied at the existing apartment complex and that residents will be provided with relocation assistance, with the potential opportunity to return if they qualify under standard screening procedures. All in favor. Motion for approval carried unanimously. 6 in favor/ 0 opposed/ 3 absent Councilmember Williams thanked the Planning Commission for their service to the community and announced the upcoming Spring Concert Series, encouraging the public to visit the Icehouse Amphitheatre page and Town website for additional information. MINUTES REGULAR TOWN PLANNING COMMISSION March 18, 2026 7 Ms. Lybrand reiterated that stakeholder meetings regarding the sign ordinance will be held on March 30, 2026, to gather public input. She noted that an online survey will also be available and encouraged residents to follow the Town’s website and social media for updates. ADJOURNMENT: Chairman Berry noted without objection that the meeting adjourned at 9:02 am Respectfully Submitted, __________________________ Laura Hinson Municipal Clerk APPROVED: ______________________ Chairman Frank Berry FOIA COMPLIANCE – Public notification of this meeting was published, posted, and mailed in compliance with the Freedom of Information Act and the Town of Lexington requirement. NEW BUSINESS # 1 TO: Planning Commission FROM: Jessica Lybrand, Director of Planning and Building SUBJECT: Development Impact Fee Update – Phase 2 DATE: April 22, 2026 BACKGROUND: The Impact Fee Ordinance, adopted on February 1, 2020, requires the Planning Commission to conduct a comprehensive review and update of the following at least once every five years: the Development Impact Fee Study Report for the Town of Lexington, the Town of Lexington Capital Improvements Plan, the Housing Affordability Analysis in Support of a Development Impact Fee Study, and the Development Impact Fee Ordinance. Phase One of this update was adopted by Town Council on March 3, 2025. The transportation component was deferred until completion of the Local Transportation Improvement Plan 2.0, which is now complete. Attached is Phase Two of the required updates, which includes the transportation component. ACTION REQUESTED: Approval of a Motion Recommending that Town Council Adopt phase two of the updated Town of Lexington Development Impact Fee Study, Housing Affordability Study, Capital Improvements Plan and Development Impact Fee Ordinance. Town of Lexington, SC April 14, 2026 Final Document Housing Affordability Analysis Update City Explained Inc. L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 1 The South Carolina Development Impact Fee Act (Code of Laws of South Carolina, Title 6, Article 9, Chapter 1) requires preparation of a report that estimates the effects of imposing development impact fees on the affordability of housing in the jurisdiction. The analysis must be presented to Town Council prior to the adoption of a development impact fee ordinance that includes fees for residential development. The housing affordability analysis that follows considers the effect of proposed (updated) development impact fees for three categories — parks and recreation, municipal facilities and equipment, and transportation — on affordable housing in the Town of Lexington. The discussion is organized under eight general headings: maximum allowable impact fees, definition of affordable housing, personal income profile, housing supply, cost of homeownership, cost of renting, cost burden analysis and conclusion. Maximum Allowable Impact Fee Maximum allowable impact fees for each category are presented in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026. Typically, Town Council will apply a discount rate to the maximum allowable impact fees presented in the report to provide a reasonable fee for continued residential and non-residential investment, or to ensure impact fees collected do not exceed the cost of providing capital facilities identified to accommodate new development. The discount rate values are solely a policy decision for Town Council. The Development Impact Fee Study Update Report for Lexington dated April 14, 2026, recommends a discount rate be applied to the maximum allowable impact fees presented in the report. Specific discount rates have not been established for the three impact fee categories at this time. Therefore, the analysis assumes the most conservative condition ― maximum allowable impact fee amounts ― for assessing the effect of proposed impact fees on affordable housing in Lexington. It is expected that the cost burden analysis presented in this report would improve with the adoption of a discount rate for all three categories by Town Council. Definition of Affordable Housing The South Carolina Development Impact Fee Act defines affordable housing as “housing affordable to families whose incomes do not exceed 80 percent of the median income for the service area or areas within the jurisdiction of the government entity”. The Act is silent on a preferred methodology for examining housing affordability for families whose income does not exceed 80 percent of the median income. This analysis assumes a cost burden ratio of 30 percent to calculate housing affordability for these families, which is consistent with criteria used by the US Housing and Urban Development Department (HUD). Personal Income Profile Personal income and wealth represent the “purchasing power” of residents in the Town of Lexington to secure housing. Real estate developers study income levels and income patterns to make development decisions, such as whether to build for-sale or rental housing. Residents’ income and personal wealth also have a significant impact on the transition to homeownership. Compensation in the Town of Lexington is represented by household income, which includes all wages, tips, and bonuses earned from employment, as well as retirement income earned from a pension plan or retirement account. Households include all residents living in the home, related or unrelated. Average household income is reported by place of residence, which represents the purchasing power for people that reside in the Town of Lexington. L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 2 The median annual household income reported for the Town of Lexington is $78,164 (US Census Bureau, 2018- 2022 American Community Survey, Five-Year Estimates, Table B19013). Annual household income assumed for a family making 80 percent of the reported median is $62,531. Monthly household income for these families is $5,210 (i.e., $62,531 / 12 months = $5,210). Housing Supply Housing unit estimates for the Town of Lexington are published by the US Census Bureau. Current data estimates there are 9,820 total housing units in the Town (US Census Bureau, 2018-2022 American Community Survey, Five- Year Estimates, Table DP04). The preference for housing types and neighborhood styles varies across the jurisdiction. This section focuses on two general housing categories: owner-occupied homes and renter-occupied homes. Owner-Occupied Homes Owner-occupied homes are occupied by the owner of the unit. They are site-built homes, typically purchased using a mortgage. Owner-occupied homes represent the dominant housing type in Lexington. Current data estimates there are 6,276 owner-occupied homes in the town (US Census Bureau, 2018-2022 American Community Survey, Five- Year Estimates, Table DP04). This represents 67.7 percent of all occupied housing units reported. Housing unit estimates for the Town of Lexington report 177 for-sale homes are available for new residents (US Census Bureau, 2018-2022 American Community Survey, Five-Year Estimates, Table B25004)*. This includes unoccupied or vacant homes for sale; sold units not yet occupied; or units used for seasonal, recreational or occasional uses. These homes represent 1.80 percent of all housing units reported in the Town (i.e., 177 / 9,820 x 100 = 1.80%). These existing homes would not be subject to the town’s proposed development impact fees. Renter-Occupied Homes A rental home is occupied by a tenant through lease agreement, which gives the tenant the right to use the rental property for a period of time, usually one calendar year. Current data estimates there are 2,998 occupied rental homes in Lexington (US Census Bureau, 2018-2022 American Community Survey, Five-Year Estimates, Table DP04). This represents 32.3 percent of all occupied housing units in the Town. Housing unit estimates for Lexington report 247 rental homes are available for new residents (US Census Bureau, 2018-2022 American Community Survey, Five-Year Estimates, Table B25004)*. This includes unoccupied site-built homes, mobile homes, apartments, townhomes, etc. for rent or rented units not yet occupied. These homes represent 2.52 percent of all housing units in the town (i.e., 247 / 9,820 x 100 = 2.52%). These existing rental homes would not be subject to the town’s proposed development impact fees. Note: * = There were 122 housing units listed as “other vacant” in the American Community Survey that were not identified as either owner-occupied homes or rental homes. These homes would also be available to new residents and represent 1.24% of all housing units reported for the town (i.e., 122 / 9,820 x 100 = 1.24%). Existing homes classified as “other vacant” would not be subject to the town’s proposed development impact fees. Note: * = There were 122 housing units listed as “other vacant” in the American Community Survey that were not identified as either owner-occupied homes or rental homes. These homes would also be available to new residents and represent 1.24% of all housing units reported for the town (i.e., 122 / 9,820 x 100 = 1.24%). Existing homes classified as “other vacant” would not be subject to the town’s proposed development impact fees. L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 3 Cost of Homeownership The cost of owning a home in Lexington is represented by seven general categories: purchase price; development impact fees; mortgage payment; property tax; water, sewer and electric utilities; telephone, cable and internet utilities; and homeowners insurance. Costs within the seven general categories may vary depending on the size, condition, and location of a home. Data and assumptions used for this analysis are summarized below. Purchase Price The median home value in the Town of Lexington is reported to be $239,700 (US Census Bureau, 2018-2022 American Community Survey, Five-Year Estimates, Table B25077). However, 79.0 percent of the total housing units reported for the town by the US Census Bureau in Table B25034 (7,761 of 9,820) were built before 2010 and may not broadly reflect new home size, sales activity, or selling price characteristics in Lexington. The home-listing website Redfin approximates the typical home sale value in Lexington is $328,000 based on 35 transactions completed in November 2024 (data pulled on December 9, 2024). Home sale prices are up 5.0 percent compared to the same time last year per the website. This analysis assumes a purchase price of $328,000 for a home in Lexington to be more aggressive in the sensitivity analysis for home affordability with and without development impact fees included. Town Development Impact Fees (Current System) The Town of Lexington collects development impact fees for three categories ― parks and recreation, municipal facilities and equipment, and transportation ― on new residential dwelling units built in the study area. The purchase price of a home used for the housing affordability analysis assumes the influence of all three impact fee categories are already reflected in the purchase price (presumably incorporated by the developer) since the town’s development impact fee system became effective in February 2020. Mortgage Payment A conventional, fixed-rate 30-year mortgage was assumed to estimate typical monthly costs of principal and interest on a home loan. The down payment for a loan was assumed to be 20 percent of the purchase price (i.e., $328,000 x 20% = $65,600). The loan amount for the mortgage was determined by subtracting the down payment from the purchase price (i.e., $328,000 - $65,600 = $262,400). An interest rate of 5.963 percent (APR) was assumed for the home purchase based on a survey of competitive interest rates in the Lexington region on December 9, 2024 (www.bankrate.com). Property Tax The Lexington County Auditor’s Office provides a Tax Estimator on its website with user inputs for tax district, estimated market value, property type, residence category, and homestead exception eligibility. The tool then estimates total tax payments for the current tax year. Using this tool, a home appraised at $328,000 in the Town of Lexington is assumed to pay $2,300.91 in city and county taxes combined after credits are applied (Online Tax Payment Center). L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 4 Water, Sewer & Electric Utilities The Town of Lexington collects monthly water and sewer utility fees to offset the cost to draw and distribute water and to collect and treat sanitary sewer waste. This analysis assumes a fee of $40.25 per month for residential water service and $50.58 per month for residential sewer service in accordance with the Town of Lexington Utilities Annual Rate Schedule, 2024. Electricity costs for a home were estimated to be $112.00 per month based on information provided by town staff. Telephone, Cable & Internet Utilities Information from town staff estimates a combined bill of $204.00 for telephone, cable, and internet service in Lexington. Homeowners Insurance Homeowners insurance provides financial protection against natural disasters. It generally insures the home and the items within it. The price of homeowners insurance varies, influenced by the replacement costs and location of the home, deductible levels, and the insurance company providing the policy. The average cost of homeowners’ insurance in Lexington was estimated to be $1,969 per year based on a home replacement cost of $300,000 (www.insurance.com/south-carolina-homeowners-insurance). Monthly Payment Based on the forgoing, the monthly payment for owning a home in the Town of Lexington was estimated to be $2,329.64 for scenario one (i.e., existing town development impact fees already in place). A worksheet for estimating the monthly homeowner payment is included at the end of the report. Cost of Renting The cost of renting a home was estimated using information published by the US Census Bureau. The median gross rent (including all utilities and rental insurance) in the Town of Lexington was estimated to be $1,270 (US Census Bureau, 2018-2022 American Community Survey, Five-Year Estimates, Table B25064). Cost Burden Analysis Cost burden for affordable housing wa s measured as the ratio between payments for housing (including property taxes, fees, utilities and insurance) and reported gross median household income (US Housing and Urban Development Department, 2009). A cost burden analysis for the Town of Lexington was prepared for residents that purchase homes and residents that rent homes. The South Carolina Development Impact Fee Act defines affordable housing as “housing affordable to families whose incomes do not exceed 80 percent of the median income for the service area or areas within the jurisdiction of the government entity”. Annual household income assumed for a family making 80 percent of the reported median in Lexington is $62,531. Monthly household income for these families is $5,210 (i.e., $62,531 / 12 months = $5,210). A cost burden ratio of 30 percent was used to calculate housing affordability for the town (US Housing and Urban Development Department, 2009). L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 5 A = calculations for the monthly cost of an owner-occupied housing unit are summarized in the appendix of the report. Scenario 1: Baseline Condition (Existing Impact Fee Collected) Table 1 summarizes the cost burden analysis for residents purchasing or renting a home in Lexington with the influence of the town’s existing development impact fees (cost and category) included. More information on the average monthly median household income assumed, or the costs of homeownership and renting a home assumed, is provided earlier in the report. Table 1: Cost Burden Analysis with Current Town Impact Fees Collected Condition Monthly Income Monthly Cost A Cost Burden Owner-Occupied $5,210 $2,330 44.72% Renter-Occupied $5,210 $1,270 24.40% Note: Based on Table 1, owner-occupied housing in the town is generally not affordable to families whose income does not exceed 80 percent of median household income. Renter-occupied housing is affordable to town residents using the same cost burden threshold. Scenario 2: Anticipated Condition (Update to the Town’s Parks, Municipal, and Transportation Impact Fee Categories) New maximum allowable impact fees for the town’s three impact fee categories — parks and recreation, municipal facilities and equipment, and transportation — are presented in a new Development Impact Fee Study Update Report for Lexington dated April 14, 2026. The findings and conclusions from the development impact fee update dated April 14, 2026, include an increase in fees for single-family dwelling units ($577) and an increase in fees for multifamily dwelling units ($493) assuming the maximum allowable fees reported for the three categories combined. Conditions could change if a discount rate is adopted by the Town Council (see the discussion on page 1 of the report). Table 2 summarizes maximum allowable impact fee information from Chapter 5 in the new Development Impact Fee Study Update Report for Lexington dated April 14, 2026. Table 2: Maximum Allowable Impact Fees Ownership Category Max. Allowable Impact Fee Parks & Recreation Owner-Occupied $1,349 Renter-Occupied $846 Municipal Facilities & Equipment Owner-Occupied $371 Renter-Occupied $233 Transportation Owner-Occupied $1,187 Renter-Occupied $684 All Impact Fees Combined Owner-Occupied $2,907 Renter-Occupied $1,763 L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 6 Table 3 summarizes the cost burden analysis for residents purchasing or renting a home in Lexington with the changes presented in the town’s proposed (updated) development impact fees for parks and recreation, municipal facilities and equipment, and transportation combined. Table 3: Cost Burden Analysis with Development Impact Fees Collected Condition Monthly Income Monthly Cost A, B Cost Burden Owner-Occupied $5,210 $2,333 44.78% Renter-Occupied $5,210 $1,284 24.64% Notes: Based on Table 3, owner-occupied housing in the Town of Lexington continues to be unaffordable for families whose incomes do not exceed 80 percent of the median income assuming the potential changes to maximum allowable development impact fees presented in the updated study report. Renter-occupied housing remains affordable to town residents with the new development impact fees applied to rents assuming a 36-month payback period for the property owner to recoup his or her development impact fees. Conclusion The South Carolina Development Impact Fee Act requires preparation of a report that estimates the effect of imposing development impact fees on housing affordability in the jurisdiction. Based on this analysis, the cost burden to purchase a home in Lexington for “families whose incomes do not exceed 80 percent of the median income” exceeds the 30 percent threshold established by the US Housing and Urban Development Department for both the current and proposed new development impact fee system scenarios. The increase in cost burden attributed to the new development impact fees — assuming the worst-case condition, maximum allowable fees applied — is approximately 0.06% (absolute change) for purchasing a home. The cost burden to rent a home in Lexington for “families whose incomes do not exceed 80 percent of the median income” does not exceed the 30 percent threshold established by the US Housing and Urban Development Department for both the current and proposed new development impact fee system scenarios. The increase in cost burden attributed to the new development impact fees — assuming the worst-case condition, maximum allowable fees applied — is approximately 0.24% (absolute change) for renting a home. A = calculations for the monthly cost of an owner-occupied housing unit are summarized in the appendix of the report. B = The housing affordability analysis assumes the most conservative condition (i.e., 100% of the proposed development impact fee adjustment is passed on to the renter) for changing the gross rent (in this case decreasing it) to reflect the town’s proposed development impact fee system updates. The monthly increase assumes a 36-month payback period for the property owner to recoup his or her development impact fees (i.e., $1,270.00 + (493 ÷ 36) = $1,283.69). L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 7 APPENDIX Supporting Data and Calculations for the Housing Affordability Analysis L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 8 Cost of Homeownership Worksheet Monthly Payment Calculation Scenario 1 (Existing Impact Fees) Scenario 2 (Proposed Impact Fees) Purchase Price A $328,000.00 $328,577.00 Down Payment B $65,600.00 $65,715.00 Loan Amount C $262,400.00 $262,862.00 Loan Length (Years) 30 30 Loan Length (Months) 360 360 Yearly Interest Rate D 5.963% 5.963% Monthly Interest E 0.5% 0.5% Monthly Payment F $1,566.98 $1,569.74 Property Tax (per month) G $191.74 $191.74 Water, Sewer & Electric Utilities H $202.83 $202.83 Telephone, Cable & Internet Utilities I $204.00 $204.00 Homeowners Insurance J $164.08 $164.08 Monthly Cost $2,329.64 $2,332.40 Notes: A = Home-listing website Redfin approximates the typical home sale value in Lexington is $328,000 based on 35 transactions completed in November 2024 (data pulled on December 9, 2024). The increase in development impact fees reported in the Town of Lexington Development Impact Fee Study Update Report dated April 14, 2026, (the difference, proposed minus existing values) were added to the purchase price of a home for Scenario 2. B = Down payment was assumed to be 20% of the purchase price. C = Loan amount equals purchase price minus down payment. D = An interest rate of 5.963 percent was assumed for the home purchase based on a survey of competitive interest rates in the Lexington Region (www.bankrate.com). E = Yearly interest rate divided by 12 months. F = Payment amount for a traditional 30-year mortgage (principal and interest only) was calculated using a webtool (https://www.bankrate.com/mortgages/mortgage-calculator). G = The Lexington County Auditor’s Office provides a Tax Estimator on its website with user inputs for tax district, estimated market value, property type, residence category, and homestead exception eligibility. The tool then estimates total tax payments for the current tax year. Using this tool, a home appraised at $328,000 in the Town of Lexington is assumed to pay $2,300.91 in city and county taxes combined after credits are applied (Online Tax Payment Center). H = Average individual monthly utility rates for a residential dwelling unit assumed as follows: Water - $40.25 per month, Sewer - $50.58per month, and Electric - $112.00 per month. L HOUSING AFFORDABILITY ANALYSIS TOWN OF LEXINGTON, SC FINAL DOCUMENT ― APRIL 14, 2026 PG. 9 I = Information from town staff estimates a combined bill of $204.00 for telephone, cable, and internet service in Lexington. J = The average cost of homeowners’ insurance in Lexington was estimated to be $1,969 per year based on a home replacement cost of $300,000 (www.insurance.com/south-carolina-homeowners-insurance). The annual cost for a policy was divided by twelve for reporting monthly payments. Town of Lexington, SC April 14, 2026 Final Document Development Impact Fee Study Update Report City Explained Inc. Final Document i April 14, 2026 Acknowledgements Preparation of the Development Impact Fee Study Update Report for the Town of Lexington was a collaborative process involving numerous stakeholders, including the Lexington Town Council, Lexington Planning Commission, Lexington Town staff, and their hired consultants. All of their efforts are greatly appreciated. Lexington Town Council Hazel Livingston – Mayor Todd Carnes – Mayor Pro-Tem Ron Williams Todd Lyle Gavin Smith Will Allen Jeannie Michaels Lexington Planning Commission Frank Berry – Chair Jarett Harrelson – Vice-Chair Roscoe Caughman Jamie Fite S. H. “Sammy” Hendrix Joe Robertson JT Stephenson Betsy McCall Brian Amick Lexington Town Staff Rachelle Gleaton, Town Administrator Kevin Richardson, Assistant Town Administrator Jessica Lybrand, Planning and Building Director Kathy Pharr, Finance Director Randy Edwards, Transportation Director Consultants City Explained, Inc. CHA Consulting, Inc. Final Document ii April 14, 2026 Table of Contents Introduction Chapter 1 Parks & Recreation Chapter 2 Municipal Facilities & Equipment Chapter 3 Transportation Chapter 4 Conclusion Chapter 5 Appendices APPENDIX A State Enabling Legislation APPENDIX B Town of Lexington Development Impact Fee Ordinance APPENDIX C US Census Data and ITE Employee Space Ratio Calculations APPENDIX D Parks & Recreation Inventory and Analysis Tables APPENDIX E Municipal Facilities and Equipment Inventory and Analysis Tables APPENDIX F Transportation Inventory and Analysis Tables Introduction Chapter 1 Final Document 1-1 April 14, 2026 INTRODUCTION The Town of Lexington, South Carolina adopted a development impact fee ordinance on December 2, 2019, and started collecting impact fees on February 1, 2020 (the effective date of the original ordinance). Three categories — parks and recreation, municipal facilities and equipment, and transportation — are included in the town’s development impact fee program. Article XVI of the town’s ordinance requires a holistic review and update of the program at least once every five years. The town’s parks and recreation and municipal facilities and equipment impact fee categories were reviewed and updated on March 3, 2025 (the effective date of the amended ordinance). The transportation impact fee category was reviewed at the same time and a decision was made to delay the update to this category until the Town of Lexington Local Transportation Improvement Program v. 2.0 (LTIP v2) was completed, which occurred in March 2026. The development impact fee study update report presented herein fulfills the inventory and analytical requirements for the five-year holistic review and update for all three categories in the town’s program. It documents existing conditions, anticipates future year needs and their implementation costs, and recommends maximum allowable impact fees (by category) in accordance with the rules and requirements of the South Carolina Development Impact Fee Act. The report also serves as the foundation for (1) amending the town’s capital improvements plan to include new projects funded by impact fees, (2) updating the town’s housing and affordability analysis to support a development impact fee program, and (3) reviewing the town’s development impact fee ordinance for enforcing a local program under the Act. WHAT ARE IMPACT FEES? As communities grow, the demands placed on surrounding infrastructure continue to rise and eventually necessitate additional capacity improvements to maintain adequate levels of services. Traditionally, elected officials relied on increased local property taxes in addition to state or federal funding to pay for future year capital improvements. However, recent decreases in outside governmental funding, increases in construction costs for replacing and expanding public facilities, and rising resistance to increased property taxes have led many local governments to consider other funding mechanisms for implementing needed improvements. Impact fees represent financial payments made from a developer to the local government for funding certain off-site capital improvements needed to accommodate future growth. Fees may be collected for different public facilities and services, including parks and recreation, municipal facilities and equipment, and transportation. They generally provide a means for orderly development by mitigating some of the negative impacts of new growth, while passing costs onto new development rather than existing taxpayers. Impact fees are most useful in communities that are experiencing rapid growth and have significant land available for development. According to a national survey, approximately 59% Final Document 1-2 April 14, 2026 of cities and towns with a population over 25,000 use some form of impact fees to offset the costs of accommodating new development (results summarized in the Impact Fee Handbook prepared for the National Association of Home Builders, Updated in 2016). Two factors control the legality of collecting impact fees. First, local governments must have authority to impose the fees as a condition of development approval. Second, the design and implementation of impact fee requirements must not be unfair, arbitrary, unreasonable, or without rational basis. Impact fees must not violate a developer’s right to due process or be discriminatory. STATE ENABLING LEGISLATION The State of South Carolina grants the power for cities and counties to collect impact fees on new development pursuant to the rules and requirements set forth in the South Carolina Development Impact Fee Act (Code of Laws of South Carolina, Section 6-1-910 et seq.). A copy of the state’s enabling legislation is included in Appendix A of the report. Section 6-1- 950(B) of the Act requires a review and update of the development impact fee program at least once every five years. In Lexington, the five-year deadline to review and update the program is March 3, 2030, based on the effective date of the town’s existing ordinance. All cities and counties are required to prepare a report that estimates the effect of development impact fees on the availability of affordable housing before imposing impact fees on residential dwelling units. Based on the findings of the study, certain developments may be exempt from impact fees when all or part of the project is determined to create affordable housing, and the exempt development’s proportionate share of system improvements is funded through a revenue source other than impact fees. A housing affordability analysis in support of the town’s new development impact fee study is published as a separate report. Eligible costs may include design, acquisition, engineering, and financing attributable to those improvements recommended in the local capital improvement plan that qualify for impact fee funding. Revenues collected by the city or county may not be used for administrative or operating costs associated with imposing the impact fee. All revenues from impact fees must be maintained in an interest-bearing account (one account per impact fee category) prior to expenditure on recommended improvements. Monies must be returned to the owner of record of the property for which the impact fee was collected if they are not spent within three years of the date scheduled to be encumbered in the local capital improvement plan. All refunds to private land owners must include the pro rata portion of interest earned while on deposit in the impact fee account. The Town of Lexington is also responsible for preparing and publishing an annual report describing the amount of impact fees collected, appropriated, and spent during the preceding year for each service area in which impact fees were collected. Final Document 1-3 April 14, 2026 TOWN ORDINANCE Ordinance 2025-03 for the Town of Lexington, enacted on March 3, 2025, establishes the rules, requirements, and procedures for administering its development impact fee program. A copy of the local ordinance is included in Appendix B of the report. General sections in the ordinance include title, authority, findings, definitions, supporting documentation, jurisdiction, application and exemptions, provisions for affordable housing, determination of fees, impact fee trust funds, limitation on expenditures of funds collected, credits and reimbursements, penalties, appeal process, refunds, review, termination of development impact fees, liberal construction, and severability. Impact fees are collected for all new developments located within town limits with the exception of those circumstances listed in Article VII of the Ordinance (see Appendix B). The town calculates impact fee amounts paid for parks and recreation, municipal facilities and equipment, and transportation at the time of building permit application. The fees are paid prior to issuance of a certificate of occupancy. Fees collected by the town are deposited in a trust fund created for each impact fee category. Impact fee funds may be used to implement one or more projects listed in the town’s capital improvements plan for projects eligible for development impact fee funding, or for payment on debt used to fund new or expanded capital facilities or equipment identified in the CIP. Expenditures from each trust fund are approved by Town Council. The town produces a report each year for presentation to the Town Council summarizing where impact fees have been collected and the projects that have been funded with these monies as part of the overall annual budgeting process. STUDY AREA The study area for the analysis coincides with the Lexington Town Limits in north-central Lexington County (see Figure 1.1 on the following page). It includes land generally north of Interstate 20, east of Barr Road and Wildlife Road, south of Old Cherokee Road, and west of Mineral Springs Road. One service zone is assumed to represent the entire study area. ANALYSIS PERIOD The parks and recreation and municipal facilities and equipment impact fee categories assume a base year of 2024 for the study update. The planning horizon for the two categories is 2029. The transportation impact fee category assumes a base year of 2023 for the road link analysis and a base year of 2025 for the intersection analysis consistent with the LTIP v2. The planning horizon is 2033 for the road link analysis and 2035 for the intersection analysis. The five-year planning horizon for the parks and recreation and municipal facilities and equipment impact fee categories, and the ten-year planning horizon for the transportation impact fee category, are reasonable time periods pursuant to Section 6-1-960(B)(7) of the South Carolina Development Impact Fee Act. Final Document 1-4 April 14, 2026 Figure 1.1 – Study Area Map DEMOGRAPHIC DATA Demographic data used for the updated study was collected from four secondary sources. First, the 2024 population estimate for the Town of Lexington — reported on July 1, 2023, and deemed best available data for this study — was published by the U.S. Census Bureau (Quick Facts Data Series). Second, the 2024 employment estimate for the Town of Lexington — reported on July 1, 2022, and deemed best available data for this study — was collected from the U.S. Census Bureau, LEHD-LODES 2022 data set using their “On the Map” web application. Third, average persons per household statistics used in the study were based on information published by the US Census Bureau, American Community Survey, 2018 - 2022 for three dwelling unit categories: (1) single family, detached or attached, (2) mobile home, and (3) multifamily, two or more units. Fourth, employee space ratios used in the study were based on information published by the Institute of Transportation Engineers’ in Trip Generation, Tenth Edition. NOT TO SCALE Unincorporated Lexington County Unincorporated Lexington County Unincorporated Lexington County Lake Murray = Lexington Town Limits Final Document 1-5 April 14, 2026 Summary tables for all the demographic information highlighted in this section of the report are presented in Appendix C of the report. ANTICIPATED GROWTH The Town of Lexington 2022 Comprehensive Plan Update and the Town of Lexington Local Transportation Improvement Program v. 2.0 were used to summarize growth and development trends anticipated for the study area over the five- and ten-year planning horizons. Generally speaking, the two documents assume significant growth will continue in the future. The town’s comprehensive plan directly references the population projection report prepared by the Central Midlands COG in March 2018 for the period 2020 to 2050: Lexington County is projected to be the fast-growing county in the Central Midlands Region and is expected to add 262,452 new residents to the county's population by 2050. This represents a projected population increase of 82.4% and a projected total population in 2050 of 581,135. The majority of the growth in Lexington County is anticipated to be in the central portion of the county, in and around the Town of Lexington as well as in the Red Bank and White Knoll communities. The Gilbert area to the west of the county seat and the Pelion area (along SC 302 and Highway 6, especially) are also expected to see significant growth, while growth is also expected to be strong in the Chapin area north of Lake Murray. A map depicting the distribution of new population in and around the study area from the Central Midlands COG report is provided in Appendix C. The development impact fee study update assumes significant growth and development will continue in the study area through 2029 based on the vision, policies, maps, and preferences presented in the Town of Lexington 2022 Comprehensive Plan Update. For residential development, the study update assumes 1,155 new dwelling units and 5,310 new residents in the study area for 2029. For non-residential development, the study update assumes 1,906,610 new square feet and 3,630 new employees in the study area for 2029. New or expanded facilities will be needed in the future to serve new growth and development anticipated for the study area assuming existing service delivery standards. A table summarizing population, household, employment, and non-residential square feet projections for the study area is presented in Appendix C. For transportation, the development impact fee study update defers to the Town of Lexington Local Transportation Improvement Program v. 2.0 for growth projections. New growth and development in the study area are expected to significantly impact the transportation system, which is enumerated using a comparison of results for base year (2023) and future year (2033) road link conditions. Overall, results for the road link analysis identify nine deficient road segments in the future (see chapter five in the document for more information). A detailed summary of rising traffic volumes and congestion levels is provided in the LTIP v2. Final Document 1-6 April 14, 2026 SERVICE UNITS The development impact fee study update assumes different service units for the proposed impact fee categories, as follows: • Parks and Recreation Residents • Municipal Facilities and Equipment Residents and Employees • Transportation Vehicle Trips Maximum allowable impact fee schedules, by category, use dwelling units and square feet for reporting results. Statistics were calculated using the service units above and average persons per household, average employee space ratios, or average trip generation rates (as appropriate) assumed for the study area (see Appendix C). The uses included in the maximum allowable impact fee schedules reflect the type of land uses routinely submitted to the Town of Lexington’s Planning and Building Department for review. REPORT ORGANIZATION Each impact fee category considered for the Town of Lexington is addressed as a separate chapter in the report. For each chapter, a full analysis and resulting maximum allowable impact fee schedule are provided. Impact fee chapters are presented in the following order: (1) parks and recreation, (2) municipal facilities and equipment, and (3) transportation. Detailed worksheets for each impact fee category are provided in the Appendix of the report. Parks and Recreation Chapter 2 Final Document 2-1 April 14, 2026 The Town of Lexington provides a parks and recreation system for residents living inside the development impact fee update study area (see Chapter 1, Figure 1.1). It generally includes parkland, recreation buildings, park and recreation amenities, walking trails, and open space. This chapter inventories existing park amenities and recreation facilities, estimates replacement costs, calculates a cost-per-resident statistic for replacing facilities and amenities currently serving town residents, and recommends maximum allowable impact fees for the study area. The parks and recreation impact fee for the Town of Lexington applies only to residential land uses. METHODOLOGY The parks and recreation impact fee category uses a consumption-driven methodology. This approach charges new residential development the cost of replacing existing capacity on a one-for-one basis, assuming constant current service delivery standards. Total replacement costs are determined using fee simple land values, site development costs, facility replacement costs, amenity replacement costs, trail system replacement costs, and related professional services. The total replacement value (system-wide) is divided by the base year population estimate (2024) for the Lexington Town Limits study area to determine the cost per capita for replacing the facilities and amenities currently serving town park and recreation users. The replacement cost per resident is multiplied by average persons per household estimates for the Town of Lexington published in the US Census Bureau, American Community Survey, Five-Year Estimates, 2018-2022 to determine the maximum allowable impact fee schedule by dwelling unit category (see Appendix C). Data collected and calculations performed for this chapter are presented in Appendix D of the report. ASSET AND AMENITY INVENTORY The parks and recreation system in the Town of Lexington includes nine parks spread over 135.74 acres, which provides a range of buildings and amenities influenced largely by their size, location, and park function. A general description of park assets and amenities is highlighted in the Replacement Value section of this chapter. A detailed list of assets and amenities at each park is provided in Appendix D of the report. Generally speaking, the town provides 0.0054 acres per resident, which represents its current service delivery standard (i.e., 135.74 acres / 24,921 residents = 0.0054 acres per resident). The park also includes 36 itemized park improvements identified across the nine parks — restrooms, an amphitheater, other park ancillary buildings, playgrounds, shelters, walkways, and gazebos — to serve visitors’ needs. This equates to 0.0014 park improvements per resident as the current service delivery standard (i.e., 36 park improvements / 24,921 residents = 0.0014 park improvements per resident). Final Document 2-2 April 14, 2026 REPLACEMENT VALUE Replacement values (in 2024 dollars) for park amenities and recreation facilities are determined using current estimates for fee simple land value; site development costs; replacement costs for recreation facilities, recreation amenities, and walking trails; and professional fees. A detailed summary of the cost components included in the analysis is provided below. Fee Simple Land Value Land value information for town-owned parks and recreation facilities was collected from tax parcel data maintained by the Lexington County Tax Assessor. Two parks ― Palmetto Collegiate Institute and Icehouse Amphitheater ― share the same tax identification number as Virginia Hylton Park, and thus the land value for the two parks is omitted from the analysis to avoid double-counting in the parkland inventory. Collectively, parks and recreation facilities in the Lexington Town Limits study area are valued at $4,326,413. Recreation Buildings Recreation buildings represent heated buildings or structures used for park and recreation needs. Information for six park locations ― Virginia Hylton Park, Corley Street Park, Caractor Park, Gibson Pond Park, Icehouse Amphitheater, and Palmetto Collegiate Institute ― was provided by town staff, including the park address, park name, building size, year built, and total value. Collectively, the replacement value for recreation buildings in the Lexington Town Limits study area is $4,585,645. Park and Recreation Amenities Park and recreation amenities represent improvements made to support specific uses or activities programmed at each location — ranging from picnic tables to playground equipment to athletic fields and courts. An inventory of park and recreation amenities in the study area is provided in the appendix of the report (see Table D.3). Replacement costs for the amenities are quantified using information published in the South Carolina Municipal Insurance and Risk Financing Fund for the Town of Lexington updated in 2024. Collectively, the replacement value for park and recreation amenities in the study area is $2,714,590. Trail System Walking trails are provided at five locations in the study area: Old Lexington Mill Pond, Virginia Hylton Park, Gibson Pond Park, Gibson Road Soccer Complex, and Fourteen Mile Creek Trail. The replacement value for the trail system is valued at $1,371,962. Final Document 2-3 April 14, 2026 Site Development Costs Site development costs represent incidental expenses incurred by the town for constructing parks, park and recreation amenities, and walking trails. Site development costs might include clearing, grading, security lighting, parking, landscaping, utilities, etc. The amount of site development costs varies greatly from property-to-property based on unique site characteristics. Historical data is not available to recalculate site development costs associated with existing parks and recreation facilities and amenities in the study area. Therefore, replacement values for parks, park and recreation amenities, and walking trails are factored by 15% to account for associated site development costs. This estimate is consistent with industry standards for pre- planning related activities. Site development costs assumed for parks, park and recreation amenities, and walking trails in the study area are summarized in the appendix of the report. Site development costs for all three categories is valued at $1,261,946. Professional Services State enabling legislation allows recovery of certain professional services through impact fees associated with building parks, recreation buildings, park and recreation amenities, and walking trails. Eligible professional services may include studies and reports, surveys, design plans, legal expenses, permitting, and construction administration. Professional service fees vary greatly based on unique site characteristics. However, town staff assumes 10% of the construction costs for new parks, recreation buildings, park and recreation amenities, and walking trails is a good estimate to represent historical trends. This assumption is carried throughout the analysis. Professional service fees assumed for the four categories are summarized in the appendix of the report. Collectively, professional service fees for the four categories is valued at $1,426,057. OTHER AVAILABLE FUNDING SOURCES Grants and private donations have been used by the Town of Lexington to build existing parks, recreation buildings, park and recreation amenities, or walking trails in the past. They generally represent discretionary, lump-sum funding for specific one-time projects. There is no assurance that previous grant monies will be made available again in the future. However, the analysis assumes some growth in parks and recreation needs will continue to be funded with grant revenues. For the period between 2020 and 2024, the town received two grants totaling $2,499,201. The analysis assumed a credit of $2,499,201 for the total net replacement cost calculations, representing the average award per year ($499,840) and a five-year planning horizon (2024 to 2029). Final Document 2-4 April 14, 2026 NET TOTAL REPLACEMENT COST The replacement values noted in this chapter represent the total replacement cost for rebuilding existing parks, recreation buildings, park and recreation amenities, and walking trails in 2024 dollars. Offsets applied to the total replacement cost represent other funding sources available for implementing improvements. Based on these assumptions, the net total replacement cost for existing park and recreation assets in the Lexington Town Limits study area is $13,187,412; as detailed in the table on the following page. Table 2.1 – Total Replacement Cost Parks and Recreation Replacement Category Cost Fee Simple Land Value $4,326,413 Recreation Buildings $4,585,645 Park and Recreation Amenities $2,714,590 Trail System $1,371,962 Site Development Costs $1,261,946 Professional Services $1,426,057 Total Replacement Cost $15,686,613 Anticipated Offsets ─ Grant Funding Forecast (2024 to 2029) $2,499,201 Total Net Replacement Cost $13,187,412 COST PER RESIDENT The cost per resident represents the burden to each existing resident in the study area (in 2024 dollars) should the town have to rebuild parks, recreation buildings, park and recreation amenities, and walking trails using current service delivery standards. This statistic is developed using two factors: (1) net total replacement cost (system-wide) and (2) a population estimate for the town provided by the U.S. Census Bureau. A cost per resident for the service area is calculated by dividing the net total replacement cost by the town population estimate: Cost per Resident = Total Net Replacement Cost ($13,187,412) Population Estimate (24,921) Based on the analysis, the cost per resident to rebuild the town’s existing parks system is $529.17. Final Document 2-5 April 14, 2026 MAXIMUM ALLOWABLE IMPACT FEES A maximum allowable impact fee schedule quantifies a fair share cost to expand the town’s park and recreation system for new residential development. The cost per resident for park and recreation facilities is multiplied by average persons per household estimates published in the US Census Bureau, American Community Survey, Five-Year Estimates, 2018-2022 for the various dwelling unit categories to determine recommended maximum allowable impact fees (see the appendix for household size estimates). Table 2.2 summarizes recommended maximum allowable impact fees, by dwelling unit category, to expand the park and recreation system for new residential development based on current service delivery standards. Table 2.2 – Maximum Allowable Impact Fee Schedule Parks and Recreation Land Use Category Cost per Person Persons per Household Max. Allowable Impact Fee Single Family (Attached or Detached) $529.17 2.55 $1,349 Mobile Home $529.17 2.68 $1,418 Multifamily (> 2 Dwelling Units) $529.17 1.60 $846 DISCOUNT RATE Town Council may choose to apply a discount rate to the maximum allowable impact fees presented herein. The discount rate could be used to provide a reasonable fee for continued residential investment or to ensure that impact fees collected for parks and recreation facilities do not exceed the cost of providing capital improvements identified to accommodate new growth. Chapter 5 of the report expands on the notion of discount rates for the Town of Lexington. FUTURE YEAR PARK NEEDS The Town of Lexington will need to expand its current parks and recreation system to keep pace with future growth and development. Generally speaking, the town could expect the need for 28.67 new or expanded park acres to maintain its current service delivery standard (i.e., 5,310 new residents between 2024 and 2029 x 0.0054 acres per resident = 28.67 acres). The town could also expect the need for 7 new park improvements at new or expanded parks in the system to maintain its current service delivery standard (i.e., 5,310 new residents between 2024 and 2029 x 0.0014 park improvements per resident = 7). Development impact fees collected in the Town of Lexington must be spent on projects, or portions thereof, that increase capacity to serve the needs of future development. Any portion of a capital project intended to replace or rehabilitate existing assets, but not increase service capacity, must be funded by other sources. Municipal Facilities and Equipment Chapter 3 Final Document 3-1 April 14, 2026 The Town of Lexington provides certain municipal facilities and equipment that are eligible for development impact fee funding, which include items under the public works, police, street maintenance, sanitation, and other general service departments (planning and engineering) charged with managing growth. This chapter inventories existing assets, estimates replacement costs, and recommends maximum allowable impact fees that could be collected in the Lexington Town Limits study area (see Chapter 1, Figure 1.1). METHODOLOGY The municipal facilities and equipment impact fee category uses a consumption-driven approach. This approach charges new residential and non-residential development the cost of replacing existing capacity on a one-for-one basis assuming constant current service delivery standards. Total replacement costs are determined using fee simple land values, site development costs, facility replacement costs, vehicle and equipment replacement costs, and related professional services. The replacement value (system-wide) is calculated in two steps. First, total net replacement value is multiplied by the proportionate share of residents and employees in the study area. Second, the resulting net replacement values for residents and employees are divided by current population or employment estimates (as appropriate) to determine the cost per resident or cost per employee for replacing municipal facilities and equipment currently serving the study area. The cost per resident is converted to cost per dwelling unit category using information published for the Town of Lexington in the US Census Bureau, American Community Survey, Five-Year Estimates, 2018-2022 (see Appendix C). The cost per employee is converted to cost per 1,000 square feet of gross floor area (GFA) using information published in the Institute of Transportation Engineers’ Trip Generation, Tenth Edition (see Appendix C). Data collected and calculations performed for Chapter 3 are summarized in Appendix E of the report. MUNICIPAL FACILITIES AND EQUIPMENT INVENTORY The town’s collection of municipal facilities and equipment used to serve the study area includes four properties, five buildings, and certain vehicles used to manage or serve future growth. A general description of these assets is highlighted in the Replacement Value section of this chapter. A detailed list of assets is provided in Appendix E of the report. REPLACEMENT VALUE Replacement value (in 2024 dollars) for municipal facilities and equipment is determined using current estimates for fee simple land value; replacement costs for municipal facilities; site development costs; professional fees; and replacement costs for eligible municipal vehicles and equipment. A detailed summary of the cost components included in the analysis is provided below. Final Document 3-2 April 14, 2026 Fee Simple Land Value Land value information for municipal facilities in the service area was collected from tax parcel data maintained by the Lexington County Tax Assessor. The town’s municipal complex, parks and sanitation office, signal shop, and police substation at Hope Ferry Shopping Center are included in the analysis. Office space for the police department in several school locations is omitted from the inventory. The value of land dedicated to municipal facilities in the study area is $416,355. Municipal Buildings Municipal buildings included in the analysis are used for growth-related services or equipment storage needs. Five locations are identified for the study area, including the town’s municipal complex, public works office, pole storage building, signal shop, and police substation at Hope Ferry Shopping Center. Office space for the police department in several school locations was omitted from the inventory. Collectively, the replacement value for municipal buildings is valued at $4,393,935. A summary of building replacement values for municipal facilities in the study area is provided in the appendix of the report. Site Development Costs Site development costs represent incidental expenses incurred by the town for constructing municipal buildings. Site development costs might include clearing, grading, security lighting, parking, landscaping, utilities, etc. The amount of site development costs varies greatly from property-to-property based on unique site characteristics. Historical data is not available to recalculate site development costs associated with existing municipal buildings in the Town of Lexington. Therefore, replacement values for land and facilities were factored by 15% to account for associated site development costs. This estimate is consistent with industry standards for pre-planning related activities. Site development costs associated with municipal buildings used for growth-related services or equipment storage needs are valued at $62,453. Professional Services State enabling legislation allows recovery of certain professional services through impact fees associated with municipal buildings used for growth-related services or equipment storage needs. Eligible professional services may include studies and reports, surveys, design plans, legal expenses, permitting, and construction administration. Professional service fees vary greatly based on unique site characteristics. However, town staff assumes 10% of the construction costs for new municipal buildings is a good estimate to represent historical trends. This assumption is carried throughout the analysis. Final Document 3-3 April 14, 2026 Professional service fees assumed for municipal buildings in the study area are summarized in the appendix of the report. Collectively, professional service costs associated with existing municipal buildings is valued at $487,275. Municipal Vehicles and Equipment Municipal vehicles and equipment with an individual unit purchase price over $100,000 are included in the analysis to comply with Section 6-1-920(18)(g) of the South Carolina Development Impact Fee Act. An inventory of eligible town-owned municipal vehicles and equipment is provided in the appendix of the report. The total replacement cost for eligible municipal vehicles and equipment serving the study area is $1,487,283. OTHER AVAILABLE FUNDING SOURCES Grants have been used by the Town of Lexington to build municipal facilities or purchase municipal vehicles and equipment. The grants represent discretionary, lump-sum funding for specific one-time projects. There is no assurance that previous grant monies will be made available again in the future. However, the analysis assumes some growth in municipal facilities and equipment will continue to be funded with grant revenue sources. In 2014, the Town of Lexington received $733,000 in grant monies for the purchase of a Caiman Armored 4x4 vehicle. The analysis assumed a credit of $733,000 for the total net replacement cost calculations; representing the award received for purchase of the vehicle. It is assumed other grant monies received over the last five years for municipal facilities and equipment were used to purchase vehicles and equipment below the $100,000 minimum value threshold allowed for the impact fee study. TOTAL REPLACEMENT COST The replacement values noted in this chapter represent the total replacement cost for existing municipal buildings, vehicles, or equipment used for growth-related services or storage needs in 2024 dollars. Offsets applied to the total replacement cost represent other funding sources available for providing the assets. Based on these assumptions, the net total replacement cost for existing municipal facilities, vehicles, and equipment in the Lexington Town Limits study area is $6,114,301; detailed in the table below. [The remainder of this page intentionally left blank.] Final Document 3-4 April 14, 2026 Table 3.1 – Total Replacement Costs Municipal Facilities and Equipment Replacement Category Cost Fee Simple Land Value $416,355 Municipal Buildings $4,393,935 Site Development Costs $62,453 Professional Services $487,275 Municipal Vehicles & Equipment ( > $100,000) $1,487,283 Total Replacement Cost $6,847,301 Anticipated Offsets ─ Grant Funding Forecast (2024 to 2029) $733,000 Total Net Replacement Cost $6,114,301 TOWN RESIDENT / EMPLOYEE RATIO Information published for Lexington Town Limits estimates 24,921 residents and 17,019 employees live or work in the study area (2023 and 2022 data reported as best available). The proportionate share between residents (59%) and employees (41%) to rebuild municipal facilities and repurchase eligible equipment is as follows: residents — $3,633,154 and employees — $2,481,147. COST PER RESIDENT The cost per resident represents the burden to each existing resident in the study area (in 2024 dollars) should the town have to rebuild municipal buildings or repurchase eligible municipal vehicles and equipment using current service delivery standards. The statistic is developed using two factors: (1) net total replacement cost (system-wide) attributable to residential uses and (2) a population estimate for the town provided by the U.S. Census Bureau. The cost per resident for the service area is calculated by dividing the net total replacement cost by the town population estimate: Cost per Resident = Total Replacement Cost Attributable to Town Residents ($3,633,154) Population Estimate (24,921) Based on the analysis, the cost per resident to replace the town’s existing municipal facilities and eligible vehicles and equipment is $145.79. COST PER EMPLOYEE The cost per employee represents a burden to each existing employee in the study area (in 2024 dollars) should the town have to rebuild municipal buildings or repurchase eligible municipal vehicles and equipment using current service delivery standards. The statistic is developed using two factors: (1) net total replacement cost (system-wide) attributable to non- Final Document 3-5 April 14, 2026 residential uses and (2) employment estimates for the town summarized from US Census Bureau. The cost per employee for the study area is calculated by dividing the net total replacement cost attributable to non-residential uses by the town’s employment estimate: Cost per Employee = Total Replacement Cost Attributable to Employees ($2,481,147) Employee Estimate (17,019) Based on the analysis, the cost per employee to replace the town’s existing municipal buildings and repurchase eligible vehicles and equipment is $145.79. MAXIMUM ALLOWABLE IMPACT FEES A maximum allowable impact fee schedule quantifies a fair share cost to rebuild municipal buildings and repurchase eligible municipal vehicles and equipment to serve new residential and non-residential development. The cost per resident for municipal buildings, vehicles, and equipment is multiplied by average persons per household estimates published in the US Census Bureau, American Community Survey, Five-Year Estimates, 2018-2022 for the various dwelling unit categories to determine recommended maximum allowable impact fees (see Appendix B in the report for household size estimates). The cost per employee for municipal buildings, vehicles, and equipment is multiplied by employee space ratios developed from information published in the Institute of Transportation Engineers’ Trip Generation, Tenth Edition to determine recommended maximum allowable impact fees (see Appendix B in the report for employee space ratio estimates). Table 3.2, starting on page 3-6, summarizes recommended maximum allowable impact fees, by dwelling unit category or non-residential land use category, to rebuild municipal buildings and repurchase eligible municipal vehicles and equipment to serve new development based on current service delivery standards. DISCOUNT RATE Town Council may choose to apply a discount rate to the maximum allowable impact fees presented herein. The discount rate could be used to provide a reasonable fee for continued residential and non-residential investment, or to ensure that impact fees collected for municipal facilities and equipment do not exceed the cost of providing capital improvements identified to accommodate new growth. Chapter 5 of the report expands on the notion of discount rates for the Town of Lexington. FUTURE YEAR MUNICIPAL FACILITIES AND EQUIPMENT NEEDS The Town of Lexington will need to expand its collection of municipal facilities and equipment to keep pace with future growth and development. Existing municipal facilities and equipment that qualify for the development impact fee study include five buildings, totaling 26,872 square feet, and 6 heavy vehicles. These assets serve a daily functional population (residents + employees) of 41,940 in 2024 (i.e., 24,921 residents + 17,019 employees = 41,940 people in Final Document 3-6 April 14, 2026 the study area over a typical 24-hour weekday). Generally speaking, this equates to a service delivery standard of 0.6407 square feet per person for buildings and 0.0001 vehicles per person for heavy vehicles. Based on these standards, the town should expect an increase in demand of 5,727 square feet for buildings that manage or serve future growth, and an increase in demand of one heavy vehicle to manage or serve future growth. Development impact fees collected by the Town of Lexington must be spent on projects, or portions thereof, that increase capacity to serve the needs of future development. Any portion of a capital project intended to replace or rehabilitate existing assets, but not increase service capacity, must be funded by other sources. Final Document 3-7 April 14, 2026 Table 3.2 – Maximum Allowable Impact Fee Schedule for Municipal Facilities and Equipment Land Use Category Units Persons per Household Employee Space Ratio Cost per Person Cost per Employee Max Allowable Impact Fee Residential Uses Single Family (Attached or Detached) d.u. 2.55 ─ $145.79 ─ $371 Mobile Home d.u. 2.68 ─ $145.79 ─ $390 Multifamily (>2 Dwelling Units) d.u. 1.60 ─ $145.79 ─ $233 Hotel / Motel Uses Hotel room ─ 0.58 ─ $145.79 $84 Business Hotel room ─ 0.12 ─ $145.79 $17 Motel room ─ 0.13 ─ $145.79 $18 Recreational Uses Golf Driving Range tee ─ 0.25 ─ $145.79 $36 Movie Theater 1,000 s.f. ─ 1.47 ─ $145.79 $214 Recreation Community Center 1,000 s.f. ─ 1.06 ─ $145.79 $154 Institutional Uses Junior/Community College 1,000 s.f. ─ 1.39 ─ $145.79 $202 University/College 1,000 s.f. ─ 2.93 ─ $145.79 $427 Daycare 1,000 s.f. ─ 2.23 ─ $145.79 $325 Library 1,000 s.f. ─ 1.29 ─ $145.79 $188 Medical Uses Hospital 1,000 s.f. ─ 2.83 ─ $145.79 $412 Nursing Home 1,000 s.f. ─ 2.28 ─ $145.79 $332 Clinic 1,000 s.f. ─ 4.13 ─ $145.79 $602 Animal Hospital/Veterinary Clinic 1,000 s.f. ─ 1.69 ─ $145.79 $246 Medical/Dental Office 1,000 s.f. ─ 4.00 ─ $145.79 $583 Office Uses General Office Building 1,000 s.f. ─ 2.97 ─ $145.79 $432 Small Office Building 1,000 s.f. ─ 2.03 ─ $145.79 $295 Corporate Headquarters 1,000 s.f. ─ 3.44 ─ $145.79 $501 Single Tenant Office Building 1,000 s.f. ─ 2.98 ─ $145.79 $434 Government Office Building 1,000 s.f. ─ 3.03 ─ $145.79 $441 US Post Office 1,000 s.f. ─ 1.80 ─ $145.79 $262 Government Office Complex 1,000 s.f. ─ 2.56 ─ $145.79 $373 Office Park 1,000 s.f. ─ 3.13 ─ $145.79 $456 Research and Development Center 1,000 s.f. ─ 3.42 ─ $145.79 $498 Business Park 1,000 s.f. ─ 3.08 ─ $145.79 $449 Final Document 3-8 April 14, 2026 Table 3.2 – Maximum Allowable Impact Fee Schedule for Municipal Facilities and Equipment (cont.) Land Use Category Units Persons per Household Employee Space Ratio Cost per Person Cost per Employee Max Allowable Impact Fee Retail Uses Building Materials/Lumber Store 1,000 s.f. ─ 0.74 ─ $145.79 $107 Variety Store 1,000 s.f. ─ 0.66 ─ $145.79 $96 Free-Standing Discount Store 1,000 s.f. ─ 2.16 ─ $145.79 $314 Hardware/Paint Store 1,000 s.f. ─ 0.25 ─ $145.79 $36 Nursery (Garden Center) 1,000 s.f. ─ 3.12 ─ $145.79 $454 Nursery (Wholesale) 1,000 s.f. ─ 1.67 ─ $145.79 $243 Shopping Center 1,000 s.f. ─ 2.34 ─ $145.79 $341 Automobile Sales (New) 1,000 s.f. ─ 2.49 ─ $145.79 $363 Automobile Sales (Used) 1,000 s.f. ─ 2.17 ─ $145.79 $316 Recreational Vehicle Sales 1,000 s.f. ─ 0.63 ─ $145.79 $91 Automobile Parts Sales 1,000 s.f. ─ 1.64 ─ $145.79 $239 Tire Store 1,000 s.f. ─ 1.55 ─ $145.79 $225 Supermarket 1,000 s.f. ─ 1.42 ─ $145.79 $207 Convenience Market w/ Gas Pumps 1,000 s.f. ─ 2.56 ─ $145.79 $373 Discount Superstore 1,000 s.f. ─ 2.25 ─ $145.79 $328 Discount Club 1,000 s.f. ─ 1.30 ─ $145.79 $189 Sporting Goods Superstore 1,000 s.f. ─ 6.48 ─ $145.79 $944 Pharmacy with Drive-Through Window 1,000 s.f. ─ 1.58 ─ $145.79 $230 Furniture Store 1,000 s.f. ─ 0.58 ─ $145.79 $84 Service Uses Drive-In Bank 1,000 s.f. ─ 3.15 ─ $145.79 $459 High-Turnover Restaurant 1,000 s.f. ─ 5.28 ─ $145.79 $769 Fast-Food w/o Drive-Through Window 1,000 s.f. ─ 5.18 ─ $145.79 $755 Fast-Food w/ Drive-Through Window 1,000 s.f. ─ 10.35 ─ $145.79 $1,508 Fast-Food w/ Drive-Through (No Seating) 1,000 s.f. ─ 13.36 ─ $145.79 $1,947 Quick Lubrication Vehicle Shop 1,000 s.f. ─ 4.35 ─ $145.79 $634 Automobile Parts and Service Center 1,000 s.f. ─ 1.50 ─ $145.79 $218 Gasoline/Service Station 1,000 s.f. ─ 4.36 ─ $145.79 $635 Gasoline/Service Station w/ Convenience 1,000 s.f. ─ 5.91 ─ $145.79 $861 Super Convenience w/ Gas Station 1,000 s.f. ─ 3.63 ─ $145.79 $529 Industrial Uses General Light Industrial 1,000 s.f. ─ 1.63 ─ $145.79 $237 Industrial Park 1,000 s.f. ─ 1.16 ─ $145.79 $169 Manufacturing 1,000 s.f. ─ 1.59 ─ $145.79 $231 Warehousing 1,000 s.f. ─ 0.34 ─ $145.79 $49 Transportation Chapter 4 Final Document 4-1 April 14, 2026 The Town of Lexington published its Local Transportation Improvement Program (LTIP) v. 2.0 in March 2026, which (1) documents existing and planned transportation facilities and their current and forecast demands, (2) estimates the cost to provide adequate capacity through a ten-year planning horizon, and (3) recommends specific projects to increase vehicle capacity to meet future year needs. Conditions for pedestrians, bicyclists, and transit riders reported in the LTIP were not considered for the development impact fee study update. The study area for the LTIP v. 2.0 was larger than the study area for the development impact fee update study area (see Chapter 1, Figure 1.1). Therefore, information presented in the LTIP v. 2.0 was clipped and summarized from its larger study area to report conditions, needs, and projects only for roads inside town limits. METHODOLOGY The transportation impact fee update assumes an improvements-driven approach, whereby the need and cost for providing new capacity in the transportation system is influenced by traffic volumes, level of service capacities, and annual growth rates derived from analytical models or historical trends. Detailed information about the transportation analysis completed for the LTIP v. 2.0 is provided in its summary document. The improvements-driven approach identifies existing and future deficiencies in the transportation system, but only future year improvements are included in the transportation impact fee calculations (new development is not required to address base year deficiencies). The cost of future year improvements is divided by the number of new vehicle trips anticipated for the planning horizon to identify a “cost per trip” for making necessary capacity improvements that keep up with demand. The cost per trip statistic is the basis for recommending maximum allowable transportation impact fees. TRAFFIC VOLUMES Base Year Traffic Volumes (2023) Base year traffic volumes (2023) for major roads in the study area were estimated using average annual daily traffic (AADT) volumes from the South Carolina Department of Transportation (SCDOT). Base year traffic volumes assumed for the transportation impact fee study are presented in Appendix F of the report. Future Year Traffic Volumes (2033) Future year traffic volumes were developed using the trend forecasting capability of the 2045 COATS Regional Travel Demand Model and ten-year historical volumes from the SCDOT. Specifically, the model and historical counts were used to develop an annual growth rate for each road segment using a comprehensive rate. Annual growth rates were applied to base year traffic volumes (2023) in the study area through the future year planning horizon (2033). The rates and future year traffic volumes assumed for the traffic impact fee analysis are presented in Appendix F of the report. Final Document 4-2 April 14, 2026 MAXIMUM SERVICE CAPACITY Major roads in the study area were evaluated using generalized AADT volume capacities derived from the Transportation Research Board, Highway Capacity Manual, 6th Edition. Road characteristics considered for calculating the road capacities included number of through travel lanes, posted speed limit, presence of exclusive left or right turn lanes, and presence of a center median. Level of service for both base year and future year conditions are reported in Appendix F of the report. FACILITY LINK ANALYSIS A facility link analysis was performed for major roads in the study area to evaluate existing and future year conditions using traffic volumes and level of service capacities presented in Appendix F of the report. Interstate 20 was excluded from the analysis because it was assumed improvements to the facility would be the responsibility of the South Carolina Department of Transportation. 2023 historic AADT roadway segment data from SCDOT was overlaid and linked to a unique intersection node identifier assigned using a SCDOT station numbering convention for the major road and minor road segments. At the time this dataset was extracted in February 2025, the latest AADT data was collected in 2023. This dataset provided roadway segment AADT, K-factor (percentage of AADT occurring in the peak hour), and D-factor (directional split in terms of a percentage of traffic volumes). Five-year (2018-2023) and ten-year (2013-2023) historical traffic growth trends were calculated for each segment and linked to the intersections in the same manner as the count dataset. For future year growth potential, the traffic volume data provided from the 2045 COATS Regional TDM was overlaid and linked by the major road link-id and minor road link-id to the intersection node-id. Utilizing the link volumes, five-year (2023 -2028) and ten-year (2023- 2033) future year growth rates were calculated. A comparative analysis was performed between the historic growth rates and future year growth rates for both the five- and ten-year periods. To provide a conservative approach, the highest growth rate between historical or COATS 2045 TDM versions was utilized. For the town’s LTIP v. 2.0, it was anticipated that the plan would be updated regularly (on a recurring five-year cycle) because significant growth is anticipated for the town and its surrounding areas for the foreseeable future. With the implementation of projects identified in this plan assumed to occur over a five-year cycle, a conservative approach of utilizing ten-year growth rates for the future year analyses was used to account for future traffic growth potential inside town limits. Corridor widening was not evaluated in the LTIP v. 2.0. To determine the necessary improvements to address growth along the corridors, the intersecting nodes (intersections) were individually evaluated. Intersections were ranked using the following weighting factors: Final Document 4-3 April 14, 2026 (1) 2023 AADT – 5% (3% Major Street; 2% Minor Street) Factors considered: • The existing AADT is a component in the remaining measures which had a concern of over-representation. • Comments received that the volume of traffic is a concern. (2) Intersection Crash Rate – 15% (No distribution for Major and Minor Street) Factors considered: • Safety should always be considered in transportation activities. • Comments received that crashes contribute significantly to the congestion and operation performance, and crash severity is reduced in the town due to lower vehicle operating speeds. (3) Intersection 2023 LOS – 50% (30% Major Street – 20% Minor Street) Factors considered: • Numerous comments received concerning existing traffic operational performance. (4) Intersection 2033 Degraded LOS – 30% (20% Major Street – 10% Minor Street) Factors considered: • To address traffic growth impacts. To reduce the intersection listing to 30 intersections for more detailed intersection level analysis in the LTIP v. 2.0, additional factors were considered, including: • Intersections with a current project under design, construction, or recently completed. • Intersections being evaluated in other studies where transportation improvements are being evaluated. • Intersections in the 2018 LTIP v. 1.0. • Categorizing the traffic operational analysis needed for each intersection. • Intersections where the analysis should include an adjacent intersection due to operational considerations. • Planning Level Priority Listing data anomalies. • Traffic Committee noted a specific intersection from their initial meeting. As part of the intersection analysis, default Synchro parameters published by the SCDOT were utilized. Existing values for peak hour factor (PHF) were utilized in existing conditions. Existing heavy vehicle percentages were also utilized in existing conditions. Final Document 4-4 April 14, 2026 To determine 2025 existing traffic volumes, AM and PM peak period turning movement traffic counts were conducted on Thursday, April 24, 2025. These counts were performed while local schools (i.e., Lexington District One, American Leadership Academy, and Northwood Christian School) were in session. The count data represents the 2025 existing traffic data used in the analysis. The 2025 existing capacity intersection analysis was performed using the 2025 existing traffic volumes, intersection geometrics, and collected traffic control data. The existing traffic analysis results provided the baseline for comparison of future improvements and/or traffic impacts. The 2035 horizon year intersection traffic volume was calculated by applying the highest growth rate between historical SCDOT count data and the COATS 2045 TDM to project future year turning movement volumes at each intersection. A 2035 horizon year no-build and build comparison of the transportation performance measurements was performed to provide the detailed comparison analysis of the intersections. The 2035 no-build intersection analysis evaluated the existing intersection geometry and traffic control under the projected 2035 traffic volume. The 2035 build intersection analysis evaluated the projected 2035 traffic volumes with intersection geometric and traffic control improvement alternatives. Geometric improvements include lengthening existing turn lanes to provide more vehicle storage, adding additional turn lanes, and/or adding additional through lane capacity. Traffic control improvements may include (1) adjusting signal phasing and timing, (2) providing protected-permitted or protected only left turn phases, (3) providing concurrent right turn overlap phases, (4) adjusting yellow and red clearance intervals, (5) adding or adjusting pedestrian walk and clearance times, (6) adjusting cycle lengths, (7) coordinated splits and offsets, and/or (8) implementing adaptive traffic signal control. The thresholds used to identify needed capacity improvements for anticipated traffic demands were determined using average daily traffic volumes and level of service thresholds summarized in Table 4.1. Table 4.1 – Planning Level of Service Thresholds Level of Service Categories Volume-to-Capacity Ratio Level of Service A v/c <= 0.30 Level of Service B 0.30 < v/c <= 0.50 Level of Service C 0.50 < v/c <= 0.70 Level of Service D 0.70 < v/c <= 0.84 Level of Service E 0.84 < v/c <= 1.00 Level of Service F 1.00 < v/c The number of additional lanes (i.e., new road capacity) required to address existing or future year deficiencies were identified by comparing traffic volumes (demand) to maximum service capacities (supply) for links in the study area. A ratio greater than 1.0 (demand / supply) Final Document 4-5 April 14, 2026 supported the need for capacity improvements to address traffic congestion. Base Year Conditions (2023) Base year conditions were analyzed using average daily traffic volumes and level of service capacities. Those links with a volume to service capacity ratio greater than 1.0 were determined to be deficient in the base year. Based on this methodology, 22 links, encompassing 25.27 miles, were identified as deficient for the base year conditions analysis. The 22 deficient links for the base year condition include: • S-32-106 US 378 (SUNSET BLVD) TO S- 921 (LAUREL RD) • S-32-204 S- 172 (WISE FERRY RD) TO US 1 (AUGUSTA HWY) • S-32-204 S- 77 (BARR RD) TO I- 20 (INTERSTATE 20) • S-32-28 S- 874 (HOPE FERRY RD) TO US 378 (SUNSET BLVD) • S-32-408 S- 204 (SAINT PETERS RD) TO S- 52 (OLD CHAPIN RD) • S-32-408 S- 485 (OLD CHEROKEE RD) TO SC 6 (N LAKE DR) • S-32-408 S- 52 (OLD CHAPIN RD) TO S- 485 (OLD CHEROKEE RD) • S-32-52 US 1 (W MAIN ST), US 378 TO S- 145 (MAXIE RD) • S-32-68 US 378 (SUNSET BLVD) TO S- 916 (MILL STREAM RD) • S-32-68 S- 916 (MILL STREAM RD) TO S- 738 (ANDREW CORLEY RD) • S-32-77 S- 43 (HENDRIX ST) TO US 1 (W MAIN ST) • S-32-77 S- 1207 (WILDLIFE RD) TO S- 43 (HENDRIX ST) • S-91 S- 116 (MAIDEN LN) TO US 1 (W MAIN ST) • SC-6 S- 116 (MAIDEN LN) TO I- 20 (INTERSTATE 20) • SC-6 SC 60 (LAKE MURRAY BLVD), S- 107 TO S- 68 (CORLEY MILL RD), L- 5105 • SC-6 US 1 (E MAIN ST) TO S- 116 (MAIDEN LN) • US-1 US 378 (NO NAME), S- 176 TO US 378 (W MAIN ST), S- 52 • US-1 US 378 (W MAIN ST), S- 52 TO SC 6 (N LAKE DR) • US-378 S- 485 (OLD CHEROKEE RD), L- 2271 TO S- 28 (HOPE FERRY RD), L- 6517 • US-378 US 378 (N LAKE DR) TO US 378 (COLUMBIA AVE) • US-378 S- 298 (ABBIE LN), S- 392 TO S- 485 (OLD CHEROKEE RD), L- 2271 • US-378 SC 6 (N LAKE DR) TO S- 298 (ABBIE LN), S- 392 Worksheets summarizing the facility link analysis for road segments inside the study area are presented in Appendix F. Future Year Conditions (2033) Future year conditions were analyzed using forecasted daily traffic volumes and level of service capacities. Those links with a volume to service capacity ratio greater than 1.0 were determined in the future year. Based on this methodology, 28 links, encompassing 43.21 miles, were identified for the future year conditions analysis. The 28 deficient links for the future year condition include: Final Document 4-6 April 14, 2026 • S-32-106 US 378 (SUNSET BLVD) TO S- 921 (LAUREL RD) • S-32-1207 S- 77 (BARR RD) TO S- 626 (INDUSTRIAL DR) • S-32-204 S- 172 (WISE FERRY RD) TO US 1 (AUGUSTA HWY) • S-32-204 US 1 (AUGUSTA HWY) TO S- 77 (BARR RD) • S-32-204 S- 77 (BARR RD) TO I- 20 (INTERSTATE 20) • S-32-28 S- 874 (HOPE FERRY RD) TO US 378 (SUNSET BLVD) • S-32-378 S- 28 (HOPE FERRY RD), L- 6517 TO I- 20 (INTERSTATE 20) • S-32-408 S- 204 (SAINT PETERS RD) TO S- 52 (OLD CHAPIN RD) • S-32-408 S- 485 (OLD CHEROKEE RD) TO SC 6 (N LAKE DR) • S-32-408 S- 52 (OLD CHAPIN RD) TO S- 485 (OLD CHEROKEE RD) • S-32-485 SC 6 (N LAKE DR) TO S- 408 (OLD CHEROKEE RD) • S-32-52 US 1 (W MAIN ST), US 378 TO S- 145 (MAXIE RD) • S-32-626 S- 1448 (ZENKER RD) TO SC 6 (S LAKE DR) • S-32-68 US 378 (SUNSET BLVD) TO S- 916 (MILL STREAM RD) • S-32-68 S- 916 (MILL STREAM RD) TO S- 738 (ANDREW CORLEY RD) • S-32-77 S- 278 (CALKS FERRY RD) TO S- 1207 (WILDLIFE RD) • S-32-77 S- 43 (HENDRIX ST) TO US 1 (W MAIN ST) • S-32-77 S- 1207 (WILDLIFE RD) TO S- 43 (HENDRIX ST) • SC-6 S- 116 (MAIDEN LN) TO I- 20 (INTERSTATE 20) • SC-6 SC 60 (LAKE MURRAY BLVD), S- 107 TO S- 68 (CORLEY MILL RD), L- 5105 • US-1 S- 204 (CHARTER OAK RD) TO US 378 (NO NAME), S- 176 • US-1 US 378 (NO NAME), S- 176 TO US 378 (W MAIN ST), S- 52 • US-1 US 378 (W MAIN ST), S- 52 TO SC 6 (N LAKE DR) • US-1 US 1 (W MAIN ST) TO SC 6 (N LAKE DR) • US-378 S- 485 (OLD CHEROKEE RD), L- 2271 TO S- 28 (HOPE FERRY RD), L- 6517 • US-378 US 1 (W MAIN ST), S- 52 TO SC 6 (N LAKE DR) • US-378 S- 298 (ABBIE LN), S- 392 TO S- 485 (OLD CHEROKEE RD), L- 2271 • US-378 SC 6 (N LAKE DR) TO S- 298 (ABBIE LN), S- 392 Worksheets summarizing the facility link analysis for road segments inside the study area are presented in Appendix F. IMPACTS OF ANTICIPATED GROWTH New growth and development in the study area are expected to significantly impact the transportation system, which is enumerated using a comparison of results for base year and future year conditions. Overall, results of the facility link analysis identify 9 future year segments: • S-32-1207 S- 77 (BARR RD) TO S- 626 (INDUSTRIAL DR) • S-32-204 US 1 (AUGUSTA HWY) TO S- 77 (BARR RD) • S-32-485 SC 6 (N LAKE DR) TO S- 408 (OLD CHEROKEE RD) • S-32-626 S- 1448 (ZENKER RD) TO SC 6 (S LAKE DR) • S-32-77 S- 278 (CALKS FERRY RD) TO S- 1207 (WILDLIFE RD) • US-1 S- 204 (CHARTER OAK RD) TO US 378 (NO NAME), S- 176 Final Document 4-7 April 14, 2026 • US-1 US 1 (W MAIN ST) TO SC 6 (N LAKE DR) • US-378 S- 28 (HOPE FERRY RD), L- 6517 TO I- 20 (INTERSTATE 20) • US-378 US 1 (W MAIN ST), S- 52 TO SC 6 (N LAKE DR) Worksheets summarizing the facility link analysis for road segments inside the study area are presented in Appendix F. TRANSPORTATION FACILITY IMPROVEMENT COSTS Transportation facility improvement costs were developed to quantify the financial burden of implementing capacity improvements in the study area. An opinion of probable cost was generated for the proposed improvement using conceptual level drawing in the LTIP v. 2.0 as the preferred solution. These design, construction, and right of way costs were calculated using 2025 dollars. Construction Costs Construction costs for the capacity improvements assumed in the transportation impact fee analysis were estimated using SCDOT construction bid item costs for roadway pavement area improvements (in 2025) that were reported as a component of the overall improvement project construction cost. These pavement area unit costs were extended by percentage to the other construction related activities for a typical road improvement, including grading, drainage, utility, erosion control, traffic control, etc. These unit cost and percentage estimates were utilized to generate an opinion of probable cost based on the concept level design at each intersection selected for detailed review. A review of major construction bid item unit prices was conducted of SCDOT for bids received between 2023 and 2025 (2-year period) to determine the volatility of construction pricing. This review determined that the construction inflation rate from 2023 to 2025 was 25%. Therefore, an annualized cost escalation factor of 12% was applied to estimate project costs in 2035. Right-of-Way Costs In consultation with the Town of Lexington, right-of-way costs were established based on the town’s history of ROW purchases in the study area. The costs were broken into geographic region with costs ranging from $20 per square foot in the western third of the study area to $40 per square foot in the eastern section of the study area along US 378. New ROW square foot needs were estimated from the conceptual sketches created for the LTIP v. 2.0 using geo- referenced GIS parcel data overlayed with the application of the town’s current right-of-way costs. Professional Services State enabling legislation allows recovery of certain professional services through impact fees associated with building new or expanding existing transportation facilities. Eligible professional services include studies and reports, surveys, design plans, legal expenses, Final Document 4-8 April 14, 2026 permitting, and construction administration. Professional service fees vary greatly based on each transportation corridor’s topography, natural features, or cultural resources. Generally speaking, design service fees range between ten- and fifteen-percent of the project’s construction cost. The cost to administer the construction of the project, otherwise known as construction engineering and inspection, usually ranges between twenty and twenty-five- percent. For this analysis, all professional service fees associated with new road construction projects were estimated to be forty percent. CREDITS & OFFSETS Credits and offsets were considered for the analysis to account for through-trips on the transportation system and other revenue sources available for implementing recommended transportation improvements. Detailed summaries of credits and offsets considered for the analysis are provided below. Guide Share Funds Guide share funds are available to each of the South Carolina Metropolitan Planning Organizations (MPOs) and Council of Governments (COGs) for system upgrade projects. The dollar amount is calculated by taking the MPO’s and COG’s specific proportion of the state population and applying it to the total available funds for system upgrade projects. There is currently one transportation project receiving funding in the 2023-2033 COATS Transportation Improvement Program (TIP) that would increase capacity. The specific roads benefitted by the funded project were not evaluated in the LTIP v. 2.0. This included a segment of US 378, Corley Mill Road, and Ginny Lane impacted by the Sunset Split Project. Credit for Through-Trips A “through-trip” represents a trip on the road network that neither begins nor ends in Lexington Town Limits. The analysis assumes an offset to the cost of improvements eligible for transportation impact fee funding to account for through trips. Ramey Kemp & Associates, Inc. obtained Streetlight Data as part of the LTIP v. 1.0 and associated transportation impact fee calculations completed for the town in 2018, which provided the percentage of traffic that travels through the town without stopping. From this data, the consultant determined that 29.87% of the trips neither begin nor end inside town limits and meet the definition of a through-trip. The study update presented herein assumes the same through-trip percentage as best available data, and implementation costs for proposed improvements in the study area were reduced by 29.87% to account for through-trips on the transportation network. RECOMMENDED ROAD PROJECTS Based on the foregoing analysis, new growth and development inside Lexington Town Limits are expected to increase congestion levels on the transportation network through 2033. Several transportation improvements are recommended to address these deficiencies, as follows: Final Document 4-9 April 14, 2026 Base Year Deficiencies (2023) The following improvements are recommended to address deficiencies observed in 2023. None of these projects are eligible for transportation impact fee funding because they are considered existing year deficiencies. Sunset Boulevard (US 378) and Mineral Springs Road This intersection was not selected for detailed evaluation due to the recent intersection improvements that occurred within the evaluation timeframe for the planning level ranking, which include: • Construction of northbound dual left turn movements on Mineral Springs Road. • Construction of an eastbound right turn lane on Sunset Boulevard. West Main Street (US 1/US 378) and US 378/Gibson Road This intersection analyzed the proposed improvements as a part of the transportation impact fee project and does not include additional recommendations. Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at a LOS F in the AM peak hour and a LOS D in the PM peak hour. It should be noted that field observations reveal that the destination for approximately 50% of the US 378 through traffic volume onto Gibson Road was the South Lake Drive (SC 6) corridor near I-20. Future Operational Conditions When growth is applied to the intersection traffic volume, the LOS is expected to remain a LOS F in the AM peak hour and degrade to a LOS E in the PM peak hour over the next ten years. The AM peak hour delay is expected to increase by 60%. Proposed Improvements • Construct Augusta Road eastbound right turn lane. • Extend Augusta Road westbound right turn lane. • Construct US 378 eastbound second left turn lane. • Construct Gibson Road southbound right turn lane. • Revise traffic signal to convert the split phased side street operation to concurrent. South Lake Drive (SC 6) and Middlebrook Drive/Parker Street This intersection analyses the proposed improvements currently being implemented as part of an on-going development project on Parker Street and does not include additional recommendations. Final Document 4-10 April 14, 2026 Existing Operational Observations The existing traffic operations analysis revealed that the worst side street approach performs at a LOS E in the AM peak hour and PM peak hour. It should be noted that the highest delay approach at the intersection is Middlebrook Drive during the AM peak hour and Parker Street during the PM peak hour. Middlebrook Drive serves as the only access to a fully established neighborhood and is the lowest volume approach to the intersection. The predominate turning movement at this intersection is right turns from Park Street and left turns onto Park Street as Parker Street serves as part of an alternate route to West Main Street (US 1/US 378) and East Main Street (US 1) to access South Lake Drive (SC 6) and Augusta Road (US 1), and vice versa. The other connecting streets along this alternate route include Gibson Road, Parker Street, and Swartz Road. Future Operational Conditions Under future conditions, the LOS is expected to degrade to a LOS F for both peak hours over the next ten years with a significant increase in average delay of 40% in the AM peak hour and 69% in the PM peak hour. Again, Middlebrook Drive experiences the largest delay in the AM peak hour and Parker Street in the PM peak hour. Proposed Improvements Construct Parker Street westbound right turn lane. Future Year Deficiencies (2033) The following improvements are recommended to address deficiencies observed inside Lexington Town Limits for 2033. These projects are eligible for transportation impact fee funding. Implementation costs presented for each facility include cost escalation factors applied to the year the facility is determined to exceed capacity. West Main Street (US 1)/Columbia Avenue (US 378) and Old Chapin Road Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at a LOS C in the AM peak hour and a LOS D in the PM peak hour. The following operational characteristics impact the overall operations at the intersection: • The operations of the intersection are controlled by the heavier movements along the W. Main Street eastbound through, Columbia Ave westbound though, and W Main Street northbound left turn movements. • Significant traffic queues are present on all approaches, specifically during the PM peak period for the W Main Street northbound dual left turn movement, which extends past the available left turn storage blocking access to the adjacent shared through right-turn lane. • When the W. Main Street dual left turn receives a green signal indication, the traffic Final Document 4-11 April 14, 2026 platoon turns into a red signal indication at the next signal downstream at W Main Street and Park Road/Black Avenue), which creates a shockwave to the traffic progression along W Main Street. Additional intersection and roadway geometry that impact the existing intersection operations are noted below: • Signalized pedestrian accommodations are provided on all approaches at the intersection, except for the crossing of the free flow eastbound right turn movement. • Existing access management features consist in the form of raised medians on the W. Main Street eastbound and Old Chapin Road southbound approaches for the length of the left turn lane storage with the exception of a break in the median along W. Main Street at the Walgreens and Murphy USA/Flight Deck driveways. It should be noted that left turn movements in and out of these driveways are performed crossing at least three travel lanes. Future Operational Conditions Under future conditions, the LOS is expected to remain at a LOS C in the AM peak hour and a LOS D in the PM peak hour; however, the delay is expected to increase by 23% during the AM peak hour and 15% during the PM peak hour. Proposed Improvements • Extension of the northbound dual left turn lane storage. • Extension of the existing northbound raised median to add access management controls for the dual left turn storage. • Construction of a raised concrete median along the westbound left turn storage lane connecting to the existing landscaped median. • Following geometric improvements at the intersection of W. Main Street and Park Road/Black Avenue, the traffic signal system operations should be adjusted to reduce the frequency that the northbound dual left turn movement turns into a downstream red signal indication at the intersection of W. Main Street and Park Road/Black Avenue by adjusting traffic signal offsets and/or adjusting traffic signal phase sequences to lag this dual left turn movement. South Lake Drive (SC 6) and Industrial Drive/Glassmaster Road Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at a LOS D during both the AM and PM peak hours. The following operational characteristics that impact the overall operations at the intersection were observed: • The South Lake Drive northbound left turn movement during both the AM and PM peak periods, specifically in the PM peak period, extends past the available left turn Final Document 4-12 April 14, 2026 storage, with queues reaching the intersection with the I-20 Westbound Off-Ramp. • There is a weave movement from the I-20 West Off-Ramp to the northbound left turn storage, which causes queues along the I-20 Westbound Off-Ramp. • In the AM peak period, there is a heavy Industrial Drive eastbound right turn movement. • The South Lake Drive northbound through lanes reduce from two to one lane 1,000 feet north of the intersection, which can contribute to poor lane utilization. • During the PM school dismissal at American Leadership Academy, traffic queues out of the school driveway onto Glassmaster Road and extends onto South Lake Drive. Due to the interaction between this intersection and the I-20 Westbound Off-Ramp, the intersection at South Lake Drive and the I-20 Westbound Off-Ramp have been included in the evaluation and proposed improvements. It should be noted that the signal at this intersection is part of the signal system on South Lake Drive from Industrial Drive to Old Two Notch Road that is operated and maintained by SCDOT. Future Operational Conditions Under future conditions, the LOS is expected to degrade to a LOS E over the next ten years. The delay increases by 75% in the AM peak hour and 59% in the PM peak hour. Each of the noted existing operational observations is anticipated to worsen significantly. Proposed Improvements • Construct a combination through/right turn lane on the Industrial Drive eastbound approach. • Construct a Glassmaster Road westbound right turn lane. • Modify traffic signal operation to eliminate the split phased side street operation. • Reconstruct the South Lake Drive and I-20 Westbound Off-ramp to provide a dual right turn movement. Signalize the inside right turn movement and provide overhead signage with designation to Industrial Drive and South Lake Drive. Modify the left turn onto I-20 Westbound On-Ramp. West Main Street (US 1/378) and Park Road/Black Avenue Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at a LOS B in the AM peak hour and a LOS C in the PM peak hour. The overall intersection operation is satisfactory when evaluating as a standalone intersection; however, the split-phased side street traffic signal operation impacts progression from the West Main Street corridor traffic flow due to the greater time demands of the split phase operation. Final Document 4-13 April 14, 2026 Future Operational Conditions Under future conditions, the LOS is expected to degrade to a LOS C in the AM peak hour and remain a LOS C in the PM peak hour over the next ten years. Proposed Improvements • Construct a Park Road southbound combination through/right turn lane. In the interim, the Park Road southbound approach could be remarked with an exclusive left turn lane and a combination through/right lane. This will need to be monitored to ensure southbound left turn queueing does not impact Fire and EMS response. • Modify traffic signal operation to eliminate the split phased side street operation. • Construct a raised median along W. Main Street from Park Road/Black Ave to the existing median to the west of the intersection . • Following geometric improvements at the intersection of W. Main Street and Old Chapin Road to provide additional northbound storage, the traffic signal system operations should be adjusted to reduce the frequency that the northbound dual left turn movement from W. Main Street turns into a downstream red signal indication at this intersection by adjusting traffic signal offsets and/or adjusting traffic signal phase sequences at the intersection of W. Main Street and Old Chapin Road. . South Lake Drive (SC 6) and Vera Road/Railroad Avenue Existing Operational Observations Based on intersection planning level analysis, this intersection was not selected for detailed capacity analysis and traffic count data collection; however, was evaluated for improvements due to existing crash rates as the intersection experienced the fourth highest crash rate within the planning level ranking. The following operational characteristics impact the overall operations at the intersection: • Field observations revealed South Lake Drive southbound left turn traffic onto Railroad Avenue often resulted in substantial traffic queues along South Lake Drive. • Railroad Avenue westbound left turn traffic experienced significant delays due to a minimal number of acceptable gaps in the heavy South Lake Drive traffic volume and difficult driver decision making to evaluate approaching southbound South Lake Drive traffic due to the horizontal alignment of the approach. Proposed Improvements • Resurface and remark the section of South Lake Drive approximately 500 feet south of Gibson Road intersection to 500 feet north of Innovation Place to provide a reduced width three lane cross-section with one travel lane in each direction and a flush median. Widen South Lake Drive as necessary. Final Document 4-14 April 14, 2026 Sunset Boulevard (US 378) and Hope Ferry Road/Tom Corley Place Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at a LOS C in the AM peak hour and a LOS D in the PM peak hour. Due to the proximity to adjacent intersections, the analysis was performed in conjunction with the intersection at Sunset Boulevard and Palmetto Park/Hobby Lobby. It should be noted that the intersection of Sunset Boulevard and Mineral Springs Road was not included in the full analysis as counts were not obtained; however, this approach provided insight into the interaction of traffic flow along Sunset Boulevard in the area of the intersection. The following operational characteristics impact the overall operations at the intersection: • The Sunset Boulevard eastbound left turn traffic extends out of the existing 250-foot left turn lane storage and into the adjacent through lane due to the existing landscaped median during both peak and off-peak time periods. When this occurs, Sunset Boulevard eastbound is effectively reduced to a single through lane. This median is providing access management controls due to the offset Walgreen’s and Lidl driveways and forces these drives to right-in/right-out operation. • The traffic signal operates with a split phase side street operation to accommodate the lower volume approach of Tom Corley Place. • Based on field observation, approximately 25% of the Sunset Boulevard eastbound left turn traffic at Hope Ferry Road enters Sunset Boulevard as a right turn movement from Mineral Springs Road creating weaving maneuver between the two intersections. Future Operational Conditions Under future conditions, the LOS is expected to remain a LOS C in the AM peak hour and a LOS D in the PM peak hour over the next ten years. Proposed Improvements • Remove the existing landscaped median on Sunset Boulevard and extend the eastbound left turn lane storage. This improvement should be made as soon as possible to avoid the potential rear-end crashes on Sunset Boulevard. • Extend the existing four-foot median along the Sunset Boulevard eastbound left turn lane and create a directional left into the Lowes Food driveway converting the driveway to ¾ access restricting the left turn movement out of the driveway. • Restripe the Hope Ferry Road approach to have an exclusive right-turn lane, exclusive through lane, and exclusive left-turn lane. • Change traffic signal operation from split phase side street operations to concurrent side street operations with a protected-permissive Hope Ferry Road southbound left turn movement. Final Document 4-15 April 14, 2026 The placement of dual eastbound left turn lanes from Sunset Blvd was considered as a design alternative. Right-of-way impacts associated with the widening of Hope Ferry Road for a minimum of 1,000 feet to receive the dual turning movements resulted in this alternative being dropped as well as poor operational performance when analyzed. Augusta Highway (US 1) and Barr Road Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at a LOS C in the AM and PM peak hours. The following operational characteristics impact the overall operations at the intersection: • The predominate traffic volumes are the Augusta Road PM westbound left turn and Barr Road (AM, off-peak, and PM) right turn volume. These are overlapping movements that run concurrently within the existing traffic signal operation. • The Augusta Road westbound left turn queue often extends out of the dedicated left turn storage but utilizes the existing two-way left turn lane as overflow storage. Future Operational Conditions Under future conditions, the LOS is expected to remain a LOS C in the AM peak hour and degrade to a LOS D in the PM peak hour over the next ten years. Although a LOS C was maintained during the AM peak hour, the delay is expected to increase by 34%. Proposed Improvements • Construct Augusta Road eastbound right turn lane. • Construct second Barr Road northbound right turn lane. South Lake Drive (SC 6) and Roberts Street Existing Operational Observations The existing traffic operations analysis revealed that the worst side street approach performs at a LOS C in the AM peak hour and a LOS E in PM peak hour. The predominate turning movement at this intersection is right turns from Roberts Street and left turns onto Roberts Street as Roberts Street serves as part of an alternate route to West Main Street (US 1/US 378) and East Main Street (US 1) to access South Lake Drive (SC 6) and Augusta Road (US 1), and vice versa. The other connecting streets along this alternate route include Gibson Road, Parker Street, and Swartz Road. Future Operational Conditions Under future conditions, the LOS is expected to degrade to a LOS E in the AM peak hour and a LOS F in the PM peak hour over the next ten years. Final Document 4-16 April 14, 2026 Proposed Improvements • Construct Roberts Street eastbound right turn lane. West Main Street (US 1/378) and Thompson Street/Food Lion Driveway This intersection was included in the evaluation to determine the impacts associated with the Lexington Medical Center (LMC) expansion and its associated relocation of the traffic signal from the existing LMC/Shopping Center Drive to Thompson Street. Existing Operational Observations The existing traffic operations analysis revealed that the worst side street approach performs at a LOS B in the AM peak hour and a LOS C in the PM peak hour. The overall intersection operation is satisfactory when evaluating as a standalone intersection. Future Operational Conditions Under future conditions, the LOS is expected to degrade to a LOS D in the AM peak hour and remain a LOS C in the PM peak hour over the next ten years. Proposed Improvements • Construct W. Main Street eastbound and westbound right turn lanes. • Construct a raised median along W. Main Street to restrict the existing LMC and Shopping Center Drive driveways to right-in/right-out operation and extend the median to the intersection. • Construct a raised median along W. Main Street for the length of the westbound left turn lane. • Reconstruct the Food Lion driveway entrance to remove the drop curb design and utilize a radius return design and improve the driveway profile connection to W. Main Street. • Relocate the traffic signal from the existing LMC driveway intersection to Thompson Street. Sunset Blvd (US 378) and Palmetto Park Boulevard Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at LOS C in the AM and PM peak hours. This intersection experiences congestion along Sunset Blvd which is a result of adjacent signal operations such as Mineral Springs and Hope Ferry Road. Future Operational Conditions Under future conditions, the LOS is expected to remain at LOS C over the next ten years in Final Document 4-17 April 14, 2026 both the AM and PM peak hours. The delay increases by 17% in the AM peak hour and 8% in the PM peak hour. Proposed Improvements • Construct Sunset Blvd eastbound right turn lane. It should be noted elimination of split-phased side street traffic signal operations at adjacent intersections of Sunset Blvd with Mineral Springs Road and Hope Ferry Road will have additional improvement to the traffic operations at this intersection. Old Chapin Road and Rose Lake/Maxie Road This intersection was selected for evaluation due to a potential development on Maxie Road that would impact this intersection. Existing Operational Observations The existing traffic operations analysis revealed that the Maxie Road approach performs at a LOS C in the AM and PM peak hours. It should be noted that due to the separation between the Rose Lake and Maxie Road intersections with Old Chapin Road each side street intersection was analyzed separately. Future Operational Conditions Under future conditions, the LOS is expected to remain a LOS C in the AM peak hour and degrade to a LOS D in the PM peak hour over the next ten years. Maxie Road is expected to experience the highest side street delay for the future period. Proposed Improvements • Relocate Maxie Road to provide a 90-degree intersection angle. • Construct an Old Chapin Road northbound right turn lane. With these improvements, the Maxie Road approach operation improves to a LOS B in the AM peak hour and is restored to a LOS C in the PM peak hour for future volumes. Barr Road and Hendrix Road Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at LOS D in the AM peak hour and LOS E in the PM peak hour. Final Document 4-18 April 14, 2026 Future Operational Conditions When growth is applied to the intersection traffic volume, the LOS is expected to degrade to LOS F over the next ten years in both the AM and PM peak hours. The AM peak hour delay is expected to increase by 86% while the PM peak hour delay increase is 254%. Proposed Improvements • Relocate Hendrix Road to provide a 90-degree intersection angle. • Construct a Barr Road northbound right turn lane. Sunset Boulevard (US 378) and Coventry Drive/Home Depot Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at a LOS B in the AM and PM peak hours. This intersection operation is influenced by the operations at the intersection of Sunset Boulevard (US 378) and North Lake Drive (SC 6), which results in Sunset Boulevard westbound traffic queue spillback into this intersection. Future Operational Conditions Under future conditions, the LOS is expected to remain LOS B. Proposed Improvements • Construct Sunset Boulevard eastbound and westbound right turn lanes. This improvement will provide consistent treatment of right turn lane along the Sunset Boulevard corridor. • Remark Coventry Drive approach to a single lane. • Remark Home Depot driveway to an exclusive right turn lane and a combination through/left lane. • Modify traffic signal operation to add right turn overlap phasing for the Home Depot driveway approach. Gibson Road and Hendrix Road Existing Operational Observations The existing traffic operations analysis revealed that the overall intersection performs at a LOS C in the AM and PM peak hours. It should be noted that during the PM peak period, traffic queues at the intersection of West Main Street (US 1/US 378) and US 378/Gibson Road extend through this intersection and limits Gibson Road northbound flow. Final Document 4-19 April 14, 2026 Future Operational Conditions Under future conditions, the LOS is expected to degrade to a LOS F over the next ten years in both the AM and PM peak hours. The AM peak hour delay is expected to increase by 175% while the PM peak hour delay is expected to increase by 140%. Proposed Improvements • Reconstruction intersection to a roundabout. • Eliminate Derrick Street connection to this intersection and cul-de-sac. It should be noted that this improvement cannot be implemented until improvements are made to the intersection of West Main Street (US 1/US 378) and US 378/Gibson Road to resolve the PM peak period Gibson Road northbound traffic queue spillback issues. East Main Street (US 1) and Swartz Road This intersection was included in the intersection evaluation due to the intersection being a part of the alternate route to West Main Street (US 1/US 378) and East Main Street (US 1) to access South Lake Drive (SC 6) and Augusta Road (US 1), and vice versa, via Roberts Street, South Lake Drive, Parker Street and Swartz Road. It was noted that during the AM peak hour vehicles waiting to turn left from Swartz Road would block the heavier right turn movement. This occurrence is not captured in the LOS analysis noted below. Existing Operational Observations The existing traffic operations analysis revealed that the Swartz Road approach performs at a LOS F in the AM and PM peak hours. It should be noted that the LOS is calculated on the low volume Swartz Road left turn movement only as the right turn from Swartz Road is free flow into the outside right lane of E Main Street. Future Operational Conditions Under future conditions, the LOS is expected to remain a LOS F for the next ten years with significant degrading for the Swartz Road left turn movement. Proposed Improvements • Construct a Swartz Road northbound right turn lane. • Remark East Main Street westbound approach to install a zipper merge configuration to promote utilization of the two lanes along East Main Street. This will help reduce the queueing impacts along East Main Street to the Library Hill Lane/Cedarcrest Village Lane and Cedarcrest Drive intersections. Final Document 4-20 April 14, 2026 Industrial Drive and Zenker Road This intersection was included in the intersection evaluation due to the intersection being a part of the future consideration approach to the South Lake Drive (SC 6) and Industrial Drive/Glassmaster Road. Existing Operational Observations The existing traffic operations analysis revealed that the Zenker Road approach performs at a LOS E in the AM peak hour and a LOS C in the PM peak hour. Future Operational Conditions Under future conditions, the LOS is expected to degrade to a LOS F in the AM peak hour and a LOS D in the PM peak hour for the next ten years. Proposed Improvements • Construction Industrial Drive westbound right turn lane. COST PER TRIP Cost per trip represents the burden to each vehicle trip on the major roads in the study area to address future year deficiencies that are eligible for transportation impact fee funding. This statistic was developed using two factors: (1) estimated construction costs to address deficient links and (2) estimated average daily traffic volumes. Specifically, the cost per trip was calculated using the difference between 2033 and 2025 implementation costs divided by the difference between 2033 and 2023 average daily traffic volumes estimated across the entire transportation system. A through-trip discount (30%) accounts for trips on the transportation system that neither begin nor end inside the Lexington Town Limits. A trip end discount (50%) ensures that two-way trips are not double charged with a trip beginnings and endings at the same place. The cost per trip formula is as follows: 𝐶𝐶𝐶𝐶𝐶𝐶 = �2035 𝐶𝐶𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃 𝐶𝐶𝑃𝑃𝐶𝐶𝑃𝑃 − 2025 𝐶𝐶𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃 𝐶𝐶𝑃𝑃𝐶𝐶𝑃𝑃 2033 𝐴𝐴𝐴𝐴𝐴𝐴𝐶𝐶 − 2023 𝐴𝐴𝐴𝐴𝐴𝐴𝐶𝐶 � ∗ (1 − 𝐶𝐶ℎ𝑃𝑃𝑃𝑃𝑟𝑟𝑟𝑟ℎ 𝐶𝐶𝑃𝑃𝑇𝑇𝑇𝑇𝐶𝐶) ∗ (1 − 𝐶𝐶𝑃𝑃𝑇𝑇𝑇𝑇 𝐸𝐸𝐸𝐸𝐸𝐸 𝐴𝐴𝑇𝑇𝐶𝐶𝑃𝑃𝑃𝑃𝑟𝑟𝐸𝐸𝑃𝑃) Based on this equation, the cost per trip is $125.76. MAXIMUM ALLOWABLE IMPACT FEES A maximum allowable impact fee schedule was developed to quantify the fair share cost of providing increased capacity in the transportation system to serve new development. The cost per trip was multiplied by trip generation rates for various residential and non-residential uses reported in the Institute of Transportation Engineers’ Trip Generation, Tenth Edition. Final Document 4-21 April 14, 2026 The maximum allowable impact fee formula was as follows: (Trips generated * (1 - pass-by trip percentage)) * cost per trip Pass-by trips in the formula account for trips already using the transportation system that would visit the site as they pass by on the adjacent street. Table 4.2 summarizes recommended maximum allowable transportation impact fees for the study area. DISCOUNT RATE Town Council may choose to apply a discount rate to the maximum allowable impact fees presented herein. The discount rate could be used to provide a reasonable fee for continued residential and non-residential investment or to ensure that impact fees collected for transportation do not exceed the cost of providing capital improvements identified to accommodate new growth. Chapter 5 of the report expands on the notion of discount rates for the Town of Lexington. Final Document 4-22 April 14, 2026 Table 4.2 – Maximum Allowable Impact Fee Schedule for Transportation Land Use Category ITE Code Units Daily Trip Rate A Pass-By Percentage B Cost per Trip Max Allowable Impact Fee Residential Uses Single Family Detached 210 d.u. 9.44 0% $125.76 $1,187 Mobile Home 240 d.u. 5.00 0% $125.76 $628 Multifamily Housing (1-2 Stories) 220 d.u. 7.32 0% $125.76 $920 Multifamily Housing (3-10 Stories) 221 d.u. 5.44 0% $125.76 $684 Hotel / Motel Uses Hotel C 310 room 8.36 10% $125.76 $946 Business Hotel D 312 room 4.02 10% $125.76 $454 Motel D 320 room 3.35 10% $125.76 $379 Recreational Uses Golf Driving Range 432 tee 13.65 0% $125.76 $1,716 Movie Theater C 444 1,000 s.f. 78.09 5% $125.76 $9,329 Recreation Community Center 495 1,000 s.f. 28.82 0% $125.76 $3,624 Institutional Uses Junior/Community College 540 1,000 s.f. 20.25 0% $125.76 $2,546 University/College 550 1,000 s.f 26.04 0% $125.76 $3,274 Daycare C 565 1,000 s.f. 47.62 50% $125.76 $2,994 Library C 590 1,000 s.f. 72.05 10% $125.76 $8,154 Medical Uses Hospital C 610 1,000 s.f. 10.72 10% $125.76 $1,213 Nursing Home C 620 1,000 s.f. 6.64 10% $125.76 $751 Clinic 630 1,000 s.f. 38.16 0% $125.76 $4,799 Animal Hospital/Veterinary Clinic 640 1,000 s.f. 21.50 0% $125.76 $2,703 Medical/Dental Office C 720 1,000 s.f. 34.80 10% $125.76 $3,938 Office Uses General Office Building C 710 1,000 s.f. 9.74 10% $125.76 $1,102 Small Office Building E 712 1,000 s.f. 16.19 10% $125.76 $1,832 Corporate Headquarters E 714 1,000 s.f. 7.95 10% $125.76 $899 Single Tenant Office Building E 715 1,000 s.f. 11.25 10% $125.76 $1,273 Government Office Building C 730 1,000 s.f. 22.59 10% $125.76 $2,556 US Post Office 732 1,000 s.f. 103.94 0% $125.76 $13,071 Government Office Complex F 733 1,000 s.f. 33.98 10% $125.76 $3,845 Office Park E 750 1,000 s.f. 11.07 10% $125.76 $1,252 Research and Development Center E 760 1,000 s.f. 11.26 10% $125.76 $1,274 Business Park E 770 1,000 s.f. 12.44 10% $125.76 $1,408 Final Document 4-23 April 14, 2026 Table 4.2 – Maximum Allowable Impact Fee Schedule for Transportation (cont.) Land Use Category ITE Code Units Daily Trip Rate A Pass-By Percentage B Cost per Trip Max Allowable Impact Fee Retail Uses Building Materials/Lumber Store 812 1,000 s.f. 18.05 0% $125.76 $2,269 Variety Store 814 1,000 s.f. 63.47 34% $125.76 $5,268 Free-Standing Discount Store 815 1,000 s.f. 53.12 17% $125.76 $5,544 Hardware/Paint Store 816 1,000 s.f. 9.14 26% $125.76 $850 Nursery (Garden Center) 817 1,000 s.f. 68.10 0% $125.76 $8,564 Nursery (Wholesale) 818 1,000 s.f. 39.00 0% $125.76 $4,904 Shopping Center 820 1,000 s.f. 37.75 34% $125.76 $3,133 Automobile Sales (New) C 840 1,000 s.f. 27.84 15% $125.76 $2,975 Automobile Sales (Used) G 841 1,000 s.f. 27.06 15% $125.76 $2,892 Recreational Vehicle Sales 842 1,000 s.f. 5.00 0% $125.76 $628 Automobile Parts Sales 843 1,000 s.f. 55.34 43% $125.76 $3,966 Tire Store 848 1,000 s.f. 28.52 28% $125.76 $2,582 Supermarket 850 1,000 s.f. 106.78 36% $125.76 $8,594 Convenience Market w/ Gas Pumps 853 1,000 s.f. 624.20 66% $125.76 $26,689 Discount Superstore 854 1,000 s.f. 90.87 21% $125.76 $9,027 Discount Club 857 1,000 s.f. 41.80 37% $125.76 $3,311 Sporting Goods Superstore 861 1,000 s.f. 28.75 0% $125.76 $3,615 Pharmacy with Drive-Through Window 881 1,000 s.f. 109.16 49% $125.76 $7,001 Furniture Store 890 1,000 s.f. 6.30 53% $125.76 $372 Service Uses Drive-In Bank 912 1,000 s.f. 100.03 35% $125.76 $8,176 High-Turnover Restaurant 932 1,000 s.f. 112.18 43% $125.76 $8,041 Fast-Food w/o Drive-Through Window H 933 1,000 s.f. 346.23 50% $125.76 $21,770 Fast-Food w/ Drive-Through Window 934 1,000 s.f. 470.95 50% $125.76 $29,613 Fast-Food w/ Drive-Through (No Seating) H 935 1,000 s.f. 459.20 50% $125.76 $28,874 Quick Lubrication Vehicle Shop 941 1,000 s.f. 69.57 0% $125.76 $8,749 Automobile Parts and Service Center 943 1,000 s.f. 16.28 0% $125.76 $2,047 Gasoline/Service Station 944 1,000 s.f. 1,202.83 42% $125.76 $87,735 Gasoline/Service Station w/ Convenience 945 1,000 s.f. 1,440.02 56% $125.76 $79,682 Super Convenience w/ Gas Station I 960 1,000 s.f. 837.58 56% $125.76 $46,346 Industrial Uses General Light Industrial C 110 1,000 s.f. 4.96 10% $125.76 $561 Industrial Park 130 1,000 s.f. 3.37 0% $125.76 $423 Manufacturing 140 1,000 s.f. 3.93 0% $125.76 $494 Warehousing C 150 1,000 s.f. 1.74 10% $125.76 $196 Final Document 4-24 April 14, 2026 Notes: A - Trip rates published in the ITE Trip Generation Manual, 10th Edition, Volume 2, Data for the "Daily Weekday Period", "General Urban/Suburban Setting" category were used for Table 4.2. B – Pass-by percentage rates published in the ITE Trip Generation Handbook, 3rd Edition for the “Weekday, PM Peak Period” category were used for Table 4.2 unless otherwise noted in the table. C – Pass-by percentage rate information was not available in the ITE Trip Generation Handbook, 3rd Edition. This analysis assumes information published in the Palm Beach County Trip Generation Rates Table, published on August 13, 2014, as a substitute. D – Pass-by rate percentage rate information is not available for the ITE land use code. This analysis assumes information reported for ITE Code 310 as a substitute. E – Pass-by rate percentage rate information is not available for the ITE land use code. This analysis assumes information reported for ITE Code 710 as a substitute. F – Pass-by rate percentage rate information is not available for the ITE land use code. This analysis assumes information reported for ITE Code 730 as a substitute. G – Pass-by rate percentage rate information is not available for the ITE land use code. This analysis assumes information reported for ITE Code 840 as a substitute. H – Pass-by rate percentage rate information is not available for the ITE land use code. This analysis assumes information reported for ITE Code 934 as a substitute. I – Pass-by rate percentage rate information is not available for the ITE land use code. This analysis assumes information reported for ITE Code 945 as a substitute. Conclusion Chapter 5 Final Document 5-1 April 14, 2026 Growth and development in the Lexington Town Limits study area (see Chapter 1, Figure 1.1) is expected to continue in the future, which will likely overburden existing parks and recreation facilities, municipal facilities and equipment, and the transportation system beyond current service delivery standards or maximum service capacities. Therefore, it is appropriate to continue the town’s development impact fee program to mitigate a proportionate share of the anticipated future deficiencies associated with new growth. DISCOUNT RATE Maximum allowable impact fees may be adopted at less than 100% of the amounts presented in previous chapters. Typically, the elected body will apply a discount rate to provide a reasonable fee for continued residential or non-residential investment or to ensure that impact fees collected for the various categories do not exceed the cost of providing recommended capital improvements. The study update recommends a discount rate be applied to the maximum allowable impact fees presented in the report. The discount rate does not need to be the same for all three impact fee categories; however, a discount rate for any one impact fee category must be applied uniformly across all the land use categories represented in the schedule. Tables 5.1 through 5.4 provide a comparison of different impact fee amounts that may be collected in the study area under a set of hypothetical discount rates. Ultimately, the discount rate applied to the maximum allowable impact fees will be a policy decision of Town Council. Table 5.1 – Discount Rate Comparison Table # Parks & Recreation Land Use Category Units Max 0% 25% 50% 75% Single Family Detached d.u. $1,349 $1,349 $1,011 $674 $337 Mobile Home d.u. $1,418 $1,418 $1,063 $709 $354 Multifamily d.u. $846 $846 $634 $423 $211 Note: # = Hypothetical impact fees presented in Table 5.1 were calculated as Maximum Allowable Impact Fee x (1 – discount rate). Table 5.2 – Discount Rate Comparison Table # Municipal Facilities & Services Land Use Category Units Max 0% 25% 50% 75% Single Family Detached d.u. $371 $371 $278 $185 $92 Mobile Home d.u. $390 $390 $292 $195 $97 Multifamily d.u. $233 $233 $174 $116 $58 General Office Building 1,000 s.f. $432 $432 $324 $216 $108 Shopping Center 1,000 s.f. $341 $341 $255 $170 $85 General Light Industrial 1,000 s.f. $237 $237 $177 $118 $59 Note: # = Hypothetical impact fees presented in Table 5.2 were calculated as Maximum Allowable Impact Fee x (1 – discount rate). Final Document 5-2 April 14, 2026 Table 5.3 – Discount Rate Comparison Table # Transportation Land Use Category Units Max 0% 25% 50% 75% Single Family Detached d.u. $1,187 $1,187 $890 $593 $296 Mobile Home d.u. $628 $628 $471 $314 $157 Multifamily d.u. $684 $684 $513 $342 $171 General Office Building 1,000 s.f. $1,102 $1,102 $826 $551 $275 Shopping Center 1,000 s.f. $3,133 $3,133 $2,349 $1,566 $783 General Light Industrial 1,000 s.f. $561 $561 $420 $280 $140 Note: # = Hypothetical impact fees presented in Table 5.3 were calculated as Maximum Allowable Impact Fee x (1 – discount rate). Table 5.4 – Discount Rate Comparison Table # All Three Impact Fee Categories Combined Land Use Category Units Max 0% 25% 50% 75% Single Family Detached d.u. $2,907 $2,907 $2,269 $1,452 $725 Mobile Home d.u. $2,436 $2,436 $1,826 $1,218 $608 Multifamily d.u. $1,763 $1,763 $1,321 $881 $440 General Office Building 1,000 s.f. $1,534 $1,534 $1,150 $767 $383 Shopping Center 1,000 s.f. $3,474 $3,474 $2,604 $1,736 $868 General Light Industrial 1,000 s.f. $798 $798 $597 $398 $199 Note: # = Hypothetical impact fees presented in Table 5.4 were calculated as Maximum Allowable Impact Fee x (1 – discount rate). Appendix Appendix A ─ State Enabling Legislation Appendix B ─ Town of Lexington Development Impact Fee Ordinance Appendix C ─ US Census Data and ITE Employee Space Ratio Calculations Appendix D ─ Parks & Recreation Inventory & Analysis Tables Appendix E ─ Municipal Facilities & Equipment Inventory & Analysis Tables Appendix F ─ Transportation Inventory & Analysis Tables SOUTH CAROLINA CODE OF LAWS TITLE 6 – LOCAL GOVERNMENT CHAPTER 1 General Provisions ARTICLE 9 Development Impact Fees SECTION 6-1-910. Short title. This article may be cited as the "South Carolina Development Impact Fee Act". HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-920. Definitions. As used in this article: (1) "Affordable housing" means housing affordable to families whose incomes do not exceed eighty percent of the median income for the service area or areas within the jurisdiction of the governmental entity. (2) "Capital improvements" means improvements with a useful life of five years or more, by new construction or other action, which increase or increased the service capacity of a public facility. (3) "Capital improvements plan" means a plan that identifies capital improvements for which development impact fees may be used as a funding source. (4) "Connection charges" and "hookup charges" mean charges for the actual cost of connecting a property to a public water or public sewer system, limited to labor and materials involved in making pipe connections, installation of water meters, and other actual costs. (5) "Developer" means an individual or corporation, partnership, or other entity undertaking development. (6) "Development" means construction or installation of a new building or structure, or a change in use of a building or structure, any of which creates additional demand and need for public facilities. A building or structure shall include, but not be li mited to, modular buildings and manufactured housing. "Development" does not include alterations made to existing single-family homes. (7) "Development approval" means a document from a governmental entity which authorizes the commencement of a development. (8) "Development impact fee" or "impact fee" means a payment of money imposed as a condition of development approval to pay a proportionate share of the cost of system improvements needed to serve the people utilizing the improvements. The term does not include: (a) a charge or fee to pay the administrative, plan review, or inspection costs associated with permits required for development; (b) connection or hookup charges; (c) amounts collected from a developer in a transaction in which the governmental entity has incurred expenses in constructing capital improvements for the development if the owner or developer has agreed to be financially responsible for the construction or installation of the capital improvements; (d) fees authorized by Article 3 of this chapter. (9) "Development permit" means a permit issued for construction on or development of land when no subsequent building permit issued pursuant to Chapter 9 of Title 6 is required. (10) "Fee payor" means the individual or legal entity that pays or is required to pay a development impact fee. (11) "Governmental entity" means a county, as provided in Chapter 9, Title 4, and a municipality, as defined in Section 5-1-20. (12) "Incidental benefits" are benefits which accrue to a property as a secondary result or as a minor consequence of the provision of public facilities to another property. (13) "Land use assumptions" means a description of the service area and projections of land uses, densities, intensities, and population in the service area over at least a ten-year period. (14) "Level of service" means a measure of the relationship between service capacity and service demand for public facilities. (15) "Local planning commission" means the entity created pursuant to Article 1, Chapter 29, Title 6. (16) "Project" means a particular development on an identified parcel of land. (17) "Proportionate share" means that portion of the cost of system improvements determined pursuant to Section 6-1-990 which reasonably relates to the service demands and needs of the project. (18) "Public facilities" means: (a) water supply production, treatment, laboratory, engineering, administration, storage, and transmission facilities; (b) wastewater collection, treatment, laboratory, engineering, administration, and disposal facilities; (c) solid waste and recycling collection, treatment, and disposal facilities; (d) roads, streets, and bridges including, but not limited to, rights-of-way and traffic signals; (e) storm water transmission, retention, detention, treatment, and disposal facilities and flood control facilities; (f) public safety facilities, including law enforcement, fire, emergency medical and rescue, and street lighting facilities; (g) capital equipment and vehicles, with an individual unit purchase price of not less than one hundred thousand dollars including, but not limited to, equipment and vehicles used in the delivery of public safety services, emergency preparedness services, collection and disposal of solid waste, and storm water management and control; (h) parks, libraries, and recreational facilities; (i) public education facilities for grades K-12 including, but not limited to, schools, offices, classrooms, parking areas, playgrounds, libraries, cafeterias, gymnasiums, health and music rooms, computer and science laboratories, and other facilities considered necessary for the proper public education of the state's children. (19) "Service area" means, based on sound planning or engineering principles, or both, a defined geographic area in which specific public facilities provide service to development within the area defined. Provided, however, that no provision in this article may be interpreted to alter, enlarge, or reduce the service area or boundaries of a political subdivision which is authorized or set by law. (20) "Service unit" means a standardized measure of consumption, use, generation, or discharge attributable to an individual unit of development calculated in accordance with generally accepted engineering or planning standards for a particular category of capital improvements. (21) "System improvements" means capital improvements to public facilities which are designed to provide service to a service area. (22) "System improvement costs" means costs incurred for construction or reconstruction of system improvements, including design, acquisition, engineering, and other costs attributable to the improvements, and also including the costs of providing additio nal public facilities needed to serve new growth and development. System improvement costs do not include: (a) construction, acquisition, or expansion of public facilities other than capital improvements identified in the capital improvements plan; (b) repair, operation, or maintenance of existing or new capital improvements; (c) upgrading, updating, expanding, or replacing existing capital improvements to serve existing development in order to meet stricter safety, efficiency, environmental, or regulatory standards; (d) upgrading, updating, expanding, or replacing existing capital improvements to provide better service to existing development; (e) administrative and operating costs of the governmental entity; or (f) principal payments and interest or other finance charges on bonds or other indebtedness except financial obligations issued by or on behalf of the governmental entity to finance capital improvements identified in the capital improvements plan. HISTORY: 1999 Act No. 118, Section 1; 2016 Act No. 229 (H.4416), Section 2, eff June 3, 2016. Effect of Amendment 2016 Act No. 229, Section 2, added (18)(i), relating to certain public education facilities. SECTION 6-1-930. Developmental impact fee. (A)(1) Only a governmental entity that has a comprehensive plan, as provided in Chapter 29 of this title, and which complies with the requirements of this article may impose a development impact fee. If a governmental entity has not adopted a comprehensive plan, but has adopted a capital improvements plan which substantially complies with the requirements of Section 6 -1-960(B), then it may impose a development impact fee. A governmental entity may not impose an impact fee, regardless of how it is designated, except as provided in this article. However , a special purpose district or public service district which (a) provides fire protection services or recreation services, (b) was created by act of the General Assembly prior to 1973, and (c) had the power to impose development impact fees prior to the e ffective date of this section is not prohibited from imposing development impact fees. (2) Before imposing a development impact fee on residential units, a governmental entity shall prepare a report which estimates the effect of recovering capital costs through impact fees on the availability of affordable housing within the political jurisdiction of the governmental entity. (B)(1) An impact fee may be imposed and collected by the governmental entity only upon the passage of an ordinance approved by a positive majority, as defined in Article 3 of this chapter. (2) The amount of the development impact fee must be based on actual improvement costs or reasonable estimates of the costs, supported by sound engineering studies. (3) An ordinance authorizing the imposition of a development impact fee must: (a) establish a procedure for timely processing of applications for determinations by the governmental entity of development impact fees applicable to all property subject to impact fees and for the timely processing of applications for individual asses sment of development impact fees, credits, or reimbursements allowed or paid under this article; (b) include a description of acceptable levels of service for system improvements; and (c) provide for the termination of the impact fee. (C) A governmental entity shall prepare and publish an annual report describing the amount of all impact fees collected, appropriated, or spent during the preceding year by category of public facility and service area. (D) Payment of an impact fee may result in an incidental benefit to property owners or developers within the service area other than the fee payor, except that an impact fee that results in benefits to property owners or developers within the service area, other than the fee payor, in an amount which is greater than incidental benefits is prohibited. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-940. Amount of impact fee. A governmental entity imposing an impact fee must provide in the impact fee ordinance the amount of impact fee due for each unit of development in a project for which an individual building permit or certificate of occupancy is issued. The governmental entity is bound by the amount of impact fee specified in the ordinance and may not charge higher or additional impact fees for the same purpose unless the number of service units increases or the scope of the development changes and the amount of additional impact fees is limited to the amount attributable to the additional service units or change in scope of the development. The impact fee ordinance must: (1) include an explanation of the calculation of the impact fee, including an explanation of the factors considered pursuant to this article; (2) specify the system improvements for which the impact fee is intended to be used; (3) inform the developer that he may pay a project's proportionate share of system improvement costs by payment of impact fees according to the fee schedule as full and complete payment of the developer's proportionate share of system improvements costs; (4) inform the fee payor that: (a) he may negotiate and contract for facilities or services with the governmental entity in lieu of the development impact fee as defined in Section 6-1-1050; (b) he has the right of appeal, as provided in Section 6-1-1030; (c) the impact fee must be paid no earlier than the time of issuance of the building permit or issuance of a development permit if no building permit is required. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-950. Procedure for adoption of ordinance imposing impact fees. (A) The governing body of a governmental entity begins the process for adoption of an ordinance imposing an impact fee by enacting a resolution directing the local planning commission to conduct the studies and to recommend an impact fee ordinance, developed in accordance with the requirements of this article. Under no circumstances may the governing body of a governmental entity impose an impact fee for any public facility which has been paid for entirely by the developer. (B) Upon receipt of the resolution enacted pursuant to subsection (A), the local planning commission shall develop, within the time designated in the resolution, and make recommendations to the governmental entity for a capital improvements plan and impact fees by service unit. The local planning commission shall prepare and adopt its recommendations in the same manner and using the same procedures as those used for developing recommendations for a comprehensive plan as provided in Article 3, Chapter 29, T itle 6, except as otherwise provided in this article. The commission shall review and update the capital improvements plan and impact fees in the same manner and on the same review cycle as the governmental entity's comprehensive plan or elements of it. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-960. Recommended capital improvements plan; notice; contents of plan. (A) The local planning commission shall recommend to the governmental entity a capital improvements plan which may be adopted by the governmental entity by ordinance. The recommendations of the commission are not binding on the governmental entity, which may amend or alter the plan. After reasonable public notice, a public hearing must be held before final action to adopt the ordinance approving the capital improvements plan. The notice must be published not less than thirty days before the time of the hearing in at least one newspaper of general circulation in the county. The notice must advise the public of the time and place of the hearing, that a copy of the capital improvements plan is available for public inspection in the offices of the governmental entity, and that members of the public will be given an opportunity to be heard. (B) The capital improvements plan must contain: (1) a general description of all existing public facilities, and their existing deficiencies, within the service area or areas of the governmental entity, a reasonable estimate of all costs, and a plan to develop the funding resources, including existing sources of revenues, related to curing the existing deficiencies including, but not limited to, the upgrading, updating, improving, expanding, or replacing of these facilities to meet existing needs and usage; (2) an analysis of the total capacity, the level of current usage, and commitments for usage of capacity of existing public facilities, which must be prepared by a qualified professional using generally accepted principles and professional standards; (3) a description of the land use assumptions; (4) a definitive table establishing the specific service unit for each category of system improvements and an equivalency or conversion table establishing the ratio of a service unit to various types of land uses, including residential, commercial, agricultural, and industrial, as appropriate; (5) a description of all system improvements and their costs necessitated by and attributable to new development in the service area, based on the approved land use assumptions, to provide a level of service not to exceed the level of service currently exi sting in the community or service area, unless a different or higher level of service is required by law, court order, or safety consideration; (6) the total number of service units necessitated by and attributable to new development within the service area based on the land use assumptions and calculated in accordance with generally accepted engineering or planning criteria; (7) the projected demand for system improvements required by new service units projected over a reasonable period of time not to exceed twenty years; (8) identification of all sources and levels of funding available to the governmental entity for the financing of the system improvements; and (9) a schedule setting forth estimated dates for commencing and completing construction of all improvements identified in the capital improvements plan. (C) Changes in the capital improvements plan must be approved in the same manner as approval of the original plan. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-970. Exemptions from impact fees. The following structures or activities are exempt from impact fees: (1) rebuilding the same amount of floor space of a structure that was destroyed by fire or other catastrophe; (2) remodeling or repairing a structure that does not result in an increase in the number of service units; (3) replacing a residential unit, including a manufactured home, with another residential unit on the same lot, if the number of service units does not increase; (4) placing a construction trailer or office on a lot during the period of construction on the lot; (5) constructing an addition on a residential structure which does not increase the number of service units; (6) adding uses that are typically accessory to residential uses, such as a tennis court or a clubhouse, unless it is demonstrated clearly that the use creates a significant impact on the system's capacity; (7) all or part of a particular development project if: (a) the project is determined to create affordable housing; and (b) the exempt development's proportionate share of system improvements is funded through a revenue source other than development impact fees; (8) constructing a new elementary, middle, or secondary school; and (9) constructing a new volunteer fire department. HISTORY: 1999 Act No. 118, Section 1; 2016 Act No. 229 (H.4416), Section 1, eff June 3, 2016. Effect of Amendment 2016 Act No. 229, Section 1, added (8) and (9), relating to certain schools and volunteer fire departments. SECTION 6-1-980. Calculation of impact fees. (A) The impact fee for each service unit may not exceed the amount determined by dividing the costs of the capital improvements by the total number of projected service units that potentially could use the capital improvement. If the number of new service units projected over a reasonable period of time is less than the total number of new service units shown by the approved land use assumptions at full development of the service area, the maximum impact fee for each service unit must be calculated by divi ding the costs of the part of the capital improvements necessitated by and attributable to the projected new service units by the total projected new service units. (B) An impact fee must be calculated in accordance with generally accepted accounting principles. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-990. Maximum impact fee; proportionate share of costs of improvements to serve new development. (A) The impact fee imposed upon a fee payor may not exceed a proportionate share of the costs incurred by the governmental entity in providing system improvements to serve the new development. The proportionate share is the cost attributable to the development after the governmental entity reduces the amount to be imposed by the following factors: (1) appropriate credit, offset, or contribution of money, dedication of land, or construction of system improvements; and (2) all other sources of funding the system improvements including funds obtained from economic development incentives or grants secured which are not required to be repaid. (B) In determining the proportionate share of the cost of system improvements to be paid, the governmental entity imposing the impact fee must consider the: (1) cost of existing system improvements resulting from new development within the service area or areas; (2) means by which existing system improvements have been financed; (3) extent to which the new development contributes to the cost of system improvements; (4) extent to which the new development is required to contribute to the cost of existing system improvements in the future; (5) extent to which the new development is required to provide system improvements, without charge to other properties within the service area or areas; (6) time and price differentials inherent in a fair comparison of fees paid at different times; and (7) availability of other sources of funding system improvements including, but not limited to, user charges, general tax levies, intergovernmental transfers, and special taxation. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1000. Fair compensation or reimbursement of developers for costs, dedication of land or oversize facilities. A developer required to pay a development impact fee may not be required to pay more than his proportionate share of the costs of the project, including the payment of money or contribution or dedication of land, or to oversize his facilities for use of o thers outside of the project without fair compensation or reimbursement. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1010. Accounting; expenditures. (A) Revenues from all development impact fees must be maintained in one or more interest -bearing accounts. Accounting records must be maintained for each category of system improvements and the service area in which the fees are collected. Interest earned on development impact fees must be considered funds of the account on which it is earned, and must be subject to all restrictions placed on the use of impact fees pursuant to the provisions of this article. (B) Expenditures of development impact fees must be made only for the category of system improvements and within or for the benefit of the service area for which the impact fee was imposed as shown by the capital improvements plan and as authorized in this article. Impact fees may not be used for: (1) a purpose other than system improvement costs to create additional improvements to serve new growth; (2) a category of system improvements other than that for which they were collected; or (3) the benefit of service areas other than the area for which they were imposed. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1020. Refunds of impact fees. (A) An impact fee must be refunded to the owner of record of property on which a development impact fee has been paid if: (1) the impact fees have not been expended within three years of the date they were scheduled to be expended on a first-in, first-out basis; or (2) a building permit or permit for installation of a manufactured home is denied. (B) When the right to a refund exists, the governmental entity shall send a refund to the owner of record within ninety days after it is determined by the entity that a refund is due. (C) A refund must include the pro rata portion of interest earned while on deposit in the impact fee account. (D) A person entitled to a refund has standing to sue for a refund pursuant to this article if there has not been a timely payment of a refund pursuant to subsection (B) of this section. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1030. Appeals. (A) A governmental entity which adopts a development impact fee ordinance shall provide for administrative appeals by the developer or fee payor. (B) A fee payor may pay a development impact fee under protest. A fee payor making the payment is not estopped from exercising the right of appeal provided in this article, nor is the fee payor estopped from receiving a refund of an amount considered to have been illegally collected. Instead of making a payment of an impact fee under protest, a fee payor, at his option, may post a bond or submit an irrevocable letter of credit for the amount of impact fees due, pending the outcome of an appeal. (C) A governmental entity which adopts a development impact fee ordinance shall provide for mediation by a qualified independent party, upon voluntary agreement by both the fee payor and the governmental entity, to address a disagreement related to the im pact fee for proposed development. Participation in mediation does not preclude the fee payor from pursuing other remedies provided for in this section or otherwise available by law. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1040. Collection of development impact fees. A governmental entity may provide in a development impact fee ordinance the method for collection of development impact fees including, but not limited to: (1) additions to the fee for reasonable interest and penalties for nonpayment or late payment; (2) withholding of the certificate of occupancy, or building permit if no certificate of occupancy is required, until the development impact fee is paid; (3) withholding of utility services until the development impact fee is paid; and (4) imposing liens for failure to pay timely a development impact fee. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1050. Permissible agreements for payments or construction or installation of improvements by fee payors and developers; credits and reimbursements. A fee payor and developer may enter into an agreement with a governmental entity, including an agreement entered into pursuant to the South Carolina Local Government Development Agreement Act, providing for payments instead of impact fees for facilities or services. That agreement may provide for the construction or installation of system improvements by the fee payor or developer and for credits or reimbursements for costs incurred by a fee payor or developer including interproject transfers of credits or reimbursement for project improvements which are used or shared by more than one development project. An impact fee may not be imposed on a fee payor or developer who has entered into an agreement as described in this section. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1060. Article shall not affect existing laws. (A) The provisions of this article do not repeal existing laws authorizing a governmental entity to impose fees or require contributions or property dedications for capital improvements. A development impact fee adopted in accordance with existing laws before the enactment of this article is not affected until termination of the development impact fee. A subsequent change or reenactment of the development impact fee must comply with the provisions of this article. Requirements for developers to pay in whole or in part for system improvements may be imposed by governmental entities only by way of impact fees imposed pursuant to the ordinance. (B) Notwithstanding another provision of this article, property for which a valid building permit or certificate of occupancy has been issued or construction has commenced before the effective date of a development impact fee ordinance is not subject to additional development impact fees. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1070. Shared funding among units of government; agreements. (A) If the proposed system improvements include the improvement of public facilities under the jurisdiction of another unit of government including, but not limited to, a special purpose district that does not provide water and wastewater utilities, a sch ool district, and a public service district, an agreement between the governmental entity and other unit of government must specify the reasonable share of funding by each unit. The governmental entity authorized to impose impact fees may not assume more t han its reasonable share of funding joint improvements, nor may another unit of government which is not authorized to impose impact fees do so unless the expenditure is pursuant to an agreement under Section 6-1-1050 of this section. (B) A governmental entity may enter into an agreement with another unit of government including, but not limited to, a special purpose district that does not provide water and wastewater utilities, a school district, and a public service district, that has the responsibility of providing the service for which an impact fee may be imposed. The determination of the amount of the impact fee for the contracting governmental entity must be made in the same manner and is subject to the same procedures and limitations as provided in this article. The agreement must provide for the collection of the impact fee by the governmental entity and for the expenditure of the impact fee by another unit of government including, but not limited to, a special purpose district that does not provide water and wastewater utilities, a school district, and a public services district unless otherwise provided by contract. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1080. Exemptions; water or wastewater utilities. The provisions of this chapter do not apply to a development impact fee for water or wastewater utilities, or both, imposed by a city, county, commissioners of public works, special purpose district, or nonprofit corporation organized pursuant to Chapter 35 or 36 of Title 33, except that in order to impose a development impact fee for water or wastewater utilities, or both, the city, county, commissioners of public works, special purpose district or nonprofit corporation organized pursuant to Chapter 35 or 36 of Title 33 must: (1) have a capital improvements plan before imposition of the development impact fee; and (2) prepare a report to be made public before imposition of the development impact fee, which shall include, but not be limited to, an explanation of the basis, use, calculation, and method of collection of the development impact fee; and (3) enact the fee in accordance with the requirements of Article 3 of this chapter. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-1090. Annexations by municipalities. A county development impact fee ordinance imposed in an area which is annexed by a municipality is not affected by this article until the development impact fee terminates, unless the municipality assumes any liability which is to be paid with the impact fee revenue. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-2000. Taxation or revenue authority by political subdivisions. This article shall not create, grant, or confer any new or additional taxing or revenue raising authority to a political subdivision which was not specifically granted to that entity by a previous act of the General Assembly. HISTORY: 1999 Act No. 118, Section 1. SECTION 6-1-2010. Compliance with public notice or public hearing requirements. Compliance with any requirement for public notice or public hearing in this article is considered to be in compliance with any other public notice or public hearing requirement otherwise applicable including, but not limited to, the provisions of Chapter 4, Title 30, and Article 3 of this chapter. HISTORY: 1999 Act No. 118, Section 1. Appendix Appendix A ─ State Enabling Legislation Appendix B ─ Town of Lexington Development Impact Fee Ordinance Appendix C ─ US Census Data and ITE Employee Space Ratio Calculations Appendix D ─ Parks & Recreation Inventory & Analysis Tables Appendix E ─ Municipal Facilities & Equipment Inventory & Analysis Tables Appendix F ─ Transportation Inventory & Analysis Tables Appendix Appendix A ─ State Enabling Legislation Appendix B ─ Town of Lexington Development Impact Fee Ordinance Appendix C ─ US Census Data and ITE Employee Space Ratio Calculations Appendix D ─ Parks & Recreation Inventory & Analysis Tables Appendix E ─ Municipal Facilities & Equipment Inventory & Analysis Tables Appendix F ─ Transportation Inventory & Analysis Tables Table C.1 − Total Population in Lexington, SC Geography Population Town of Lexington 24,921 Source: Table C.2 − Total Households in Lexington, SC Geography Number of Units Town of Lexington 9,820 Source: Table C.3 − Housing Occupancy in Lexington, SC Geography Number of Units % of Total Occupied Housing Units 9,274 94.44% Vacant Housing Units 546 5.56% Total Housing Units 9,820 100.00% Source: Table C.4 − Total Housing Units by Type in Lexington, SC Housing Category Number of Units Single Family (Attached or Detached) 6,873 Mobile Home 284 Multifamily (2 or more units) 2,663 Total 9,820 Source: Table C.5 − Population in Total Housing Units by Type in Lexington, SC Housing Category Population Single Family (Attached or Detached) 17,516 Mobile Home 760 Multifamily (2 or more units) 4,248 Total 22,524 Source: Table C.6 − Persons per Household in Total Housing Units by Type in Lexington, SC Housing Category Persons / Household Single Family (Attached or Detached) 2.55 Mobile Home 2.68 Multifamily (2 or more units) 1.60 Townwide Average 2.29 Source: Computation Using US Census Bureau, American Community Survey Data, Tables DP04 and B25033 US Census Bureau, Quickfacts, Town of Lexington, SC, 2023 Estimate on July 1, 2023 US Census Bureau, American Community Survey, Five-Year Estimates, 2018-2022, Table DP04 US Census Bureau, American Community Survey, Five-Year Estimates, 2018-2022, Table DP04 US Census Bureau, American Community Survey, Five-Year Estimates, 2018-2022, Table DP04 US Census Bureau, American Community Survey, Five-Year Estimates, 2018-2022, Table B25033 Central Midlands COG in March 2018 for the period 2020 to 2050, Figure 4 Lexington County P opulation Projections Table C.8 − Calculated Employee Space Ratios Using ITE Trip Generation Manual, Tenth Edition Data Employment Category ITE Code Units Space Ratio Hotel ITE 310 room 0.58 All Suite Hotel ITE 311 room 0.09 Business Hotel ITE 312 room 0.12 Motel ITE 320 room 0.13 Resort Hotel ITE 330 room 1.92 Golf Driving Range ITE 432 tee 0.25 Movie Theater ITE 444 1,000 s.f. 1.47 Multiplex Movie Theater ITE 445 1,000 s.f. 1.35 Amusement Park ITE 480 acre 9.60 Water Slide Park ITE 482 acre 8.99 Recreation Community Center ITE 495 1,000 s.f. 1.06 School District Office ITE 538 1,000 s.f. 2.83 Junior/Community College ITE 540 1,000 s.f. 1.39 University/College ITE 550 1,000 s.f. 2.93 Daycare ITE 565 1,000 s.f. 2.23 Museum ITE 580 1,000 s.f. 0.31 Library ITE 590 1,000 s.f. 1.29 Hospital ITE 610 1,000 s.f. 2.83 Nursing Home ITE 620 1,000 s.f. 2.28 Clinic ITE 630 1,000 s.f. 4.13 Animal Hospital/Veterinary Clinic ITE 640 1,000 s.f. 1.69 Medical/Densit Office ITE 720 1,000 s.f. 4.00 General Office Building ITE 710 1,000 s.f. 2.97 Small Office Building ITE 712 1,000 s.f. 2.03 Corporate Headquarters ITE 714 1,000 s.f. 3.44 Single Tenant Office Building ITE 715 1,000 s.f. 2.98 Government Office Building ITE 730 1,000 s.f. 3.03 US Post Office ITE 732 1,000 s.f. 1.80 Government Office Complex ITE 733 1,000 s.f. 2.56 Office Park ITE 750 1,000 s.f. 3.13 Research and Development ITE 760 1,000 s.f. 3.42 Business Park ITE 770 1,000 s.f. 3.08 Building Materials/Lumber ITE 812 1,000 s.f. 0.74 Variety Store ITE 814 1,000 s.f. 0.66 Free Standing Discount Store ITE 815 1,000 s.f. 2.16 Hardware Paint Store ITE 816 1,000 s.f. 0.25 Nursery (Garden Center) ITE 817 1,000 s.f. 3.12 Nursery (Wholesale) ITE 818 1,000 s.f. 1.67 Shopping Center ITE 820 1,000 s.f. 2.34 Auto Sales (New) ITE 840 1,000 s.f. 2.49 Auto Sales (Used) ITE 841 1,000 s.f. 2.17 Recreation Vehicle Sales ITE 842 1,000 s.f. 0.63 Automobile Parts Sales ITE 843 1,000 s.f. 1.64 Tire Store ITE 848 1,000 s.f. 1.55 Supermarket ITE 850 1,000 s.f. 1.42 Convenience Market ITE 851 1,000 s.f. 1.56 Convenience Market with Gas Pumps ITE 853 1,000 s.f. 2.56 Discount Superstore ITE 854 1,000 s.f. 2.25 Discount Club ITE 857 1,000 s.f. 1.30 Sports Goods Superstore ITE 861 1,000 s.f. 6.48 Pharmacy with Drive-Through Window ITE 881 1,000 s.f. 1.58 Furniture Store ITE 890 1,000 s.f. 0.58 Liquor Store ITE 899 1,000 s.f. 2.86 Intermodal Truck Terminal ITE 030 1,000 s.f. 2.63 General Light Industrial ITE 110 1,000 s.f. 1.63 Industrial Park ITE 130 1,000 s.f. 1.16 Manufacturing ITE 140 1,000 s.f. 1.59 Warehousing ITE 150 1,000 s.f. 0.34 Utility ITE 170 1,000 s.f. 3.22 Specialty Trade Contractor ITE 180 1,000 s.f. 2.75 Walk-In Bank ITE 911 1,000 s.f. 4.27 Drive-In Bank ITE 912 1,000 s.f. 3.15 Copy, Print, and Express Ship Store ITE 920 1,000 s.f. 1.86 Quality Restaurant ITE 931 1,000 s.f. 4.63 High-Turnover Restaurant ITE 932 1,000 s.f. 5.28 Fast-Food without Drive-Through Window ITE 933 1,000 s.f. 5.18 Fast-Food with Drive-Through Window ITE 934 1,000 s.f. 10.35 Fast-Foot with Drive-Through Window, No Seating ITE 935 1,000 s.f. 13.36 Quick Lubrication Vehicle Shop ITE 941 1,000 s.f. 4.35 Automobile Care Center ITE 942 1,000 s.f. 2.45 Automobile Parts and Service Center ITE 943 1,000 s.f. 1.50 Gas/Service Station ITE 944 1,000 s.f. 4.36 Gas/Service Station with Convenience Store ITE 945 1,000 s.f. 5.91 Super Convenience Store with Gas Pumps ITE 960 1,000 s.f. 3.63 Source: Computation using information from the Institute of Transportation Engineers, Trip Generation Manual, Tenth Edition 7DEOH&î'ZHOOLQJ8QLW3URMHFWLRQVIRUWKH7RZQRI/H[LQJWRQWR Percent Allocation A 2024 B 2025 C 2026 C 2027 C 2028 C 2029 C 5-Year Growth Dwelling Units Single Family (Attached or Detached) 70% 6,873 7,035 7,197 7,359 7,521 7,683 810 Mobile Home 3% 284 291 298 305 312 319 35 Multifamily (2 or more units) 27% 2,663 2,725 2,787 2,849 2,911 2,973 310 7RWDO'ZHOOLQJ8QLWV        Notes: A = An estimate of dwelling units by housing category in the Town of Lexington was calculated using data from the US Census Bureau, American Community Survey, 2018-2022, Table DP04. B = An allocation of existing housing units by category for the Town of Lexington was calculated using information published in the US Census Bureau, American Community Survey, 2018-2022, Table DP04. C = Projections for dwelling units in future years assumed an annual growth rate of 2.35% as reported in the Town of Lexington 2022 Comprehensive Plan Update, Population Element. 7DEOH&î3RSXODWLRQ3URMHFWLRQVIRUWKH7RZQRI/H[LQJWRQWR Household Size A 2024 B 2025 C 2026 C 2027 C 2028 C 2029 C 5-Year Growth Population Single Family (Attached or Detached) 2.55 — 413 413 413 413 413 2,065 Mobile Home 2.68 — 19 19 19 19 19 95 Multifamily (2 or more units) 1.60 — 99 99 99 99 99 495 7RWDO3HRSOH        Notes: A = An estimate of household size by housing category in the Town of Lexington was calculated using data from the US Census Bureau, American Community Survey, 2018-2022, Tables DP04 and B25033. B = A population estimate for 2024 was collected from the US Census Bureau, Quickfacts, Town of Lexington, SC, Population Estimate, July 1, 2023 (best available data). C = Projections for population in future years assumed an annual growth rate of 2.35% as reported in the Town of Lexington 2022 Comprehensive Plan Update, Population Element. 7DEOH&î(PSOR\PHQW3URMHFWLRQVIRUWKH7RZQRI/H[LQJWRQWR Percent Allocation A 2024 B 2025 C 2026 C 2027 C 2028 C 2029 C 5-Year Growth Employees Retail 36% 6,153 131 131 131 131 131 655 Office 53% 9,035 193 193 193 193 193 965 Industrial 11% 1,831 39 39 39 39 39 195 7RWDO(PSOR\HHV        Notes: A = An estimate of employees by industry category in the Town of Lexington was calculated using data from the US Census Bureau, On the Map Tool. The search was set to "Work Area" and "Primary Jobs" in the City of York, SC. B = An employee estimate for 2024 was collected from the US Census Bureau, On the Map Tool. The search was set to "Work Area" and "Primary Jobs" in the City of York, SC. C = Projections for employment in future years assumed constant a residents-to-employees ratio for the Town of Lexington based on 2024 estimates (i.e., 17,019 employees / 24,921 residents = 0.683 employees per resident). 7DEOH&î1RQ5HVLGHQW6TXDUH)HHW3URMHFWLRQVIRUWKH7RZQRI/H[LQJWRQWR Space Ratio A 2024 B 2025 C 2026 C 2027 C 2028 C 2029 C 5-Year Growth Non-Resident Square Feet Retail 2.09 2,944,019 62,679 62,679 62,679 62,679 62,679 313,395 Office 2.28 3,962,719 84,649 84,649 84,649 84,649 84,649 423,245 Industrial 0.90 2,034,444 43,333 43,333 43,333 43,333 43,333 216,665 7RWDO6TXDUH)HHW         Notes: B = An estimate for non-residential square feet for the Town of Lexington in 2024 was created using the employee estimates in Table C.11 and the employee space ratio assumptions reported in the table. C =Projections for non-residential square feet in future years assumed the employee projections in Table C.11 and the employee space ratio assumptions by type reported in this table. Housing Category Housing Category Employment Category Employment Category A = Employee space ratios assumed for the calculations are based on information published by the Institute of Transportation Engineers, Trip Generation Manual, Twelfth Edition (i.e., number of employees per 1,000 square feet of gross floor area). Appendix Appendix A ─ State Enabling Legislation Appendix B ─ Town of Lexington Development Impact Fee Ordinance Appendix C ─ US Census Data and ITE Employee Space Ratio Calculations Appendix D ─ Parks & Recreation Inventory & Analysis Tables Appendix E ─ Municipal Facilities & Equipment Inventory & Analysis Tables Appendix F ─ Transportation Inventory & Analysis Tables Table D.1 − Parkland Replacement Values Park Name TMS Number Location Acres Site Development Costs (15%) F Professional Services (10%) G Virginia Hylton Park 004320-09-010 209 S. Lake Drive $3,205,200 B 14.97 $480,780 $368,598 Gibson Pond Park 005496-01-100 241 Gibson Road $431,940 58.80 $64,791 $49,673 Corley Street Park 004324-04-011 210 Co rley Street $88,665 2.57 $13,300 $10,197 William B. Caractor Park 004326-03-006 & - 009 804 Hendrix Street $36,500 0.43 $5,475 $4,198 Icehouse Amphitheater 004320-09-010 107 W. Main Street ― C 2.71 ―― Palmetto Collegiate Institute 004320-09-010 104 Hendrix Street ― D 21.25 ―― Lexington Paw Park 004300-08-023 989 Hendrix Street $55,000 E 1.10 $8,250 $6,325 Fourteen Mile Creek Trail 004300-01-030 1104 N. Lake Drive $43,008 32.52 $6,451 $4,946 Icehouse Amphitheater Overflow Parking 004320-04-004 & -010 212 N. Church Street $466,100 1.39 $69,915 $53,602 Totals $4,326,413 135.74 $648,962 $497,539 Notes: G = A professional services allowance (10%) is assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. Taxable Land Value A A = Taxable Land Values were collected from the County of Lexington Property Tax Search website (https://www.lex-co.com/PropSearch/#/property) on November 27, 2024. B = The size and value of Virginia Hylton Park (in acres and dollars) was reduced to represent only the areas dedicated to Town of Lexington parks and recreation uses (i.e., 14.97 acres / 21.25 acres = 70.4%). D = Virginia Hylton Park and the Palmetto Collegiate Institute share the same TMS number; therefore, the land value for Palmetto Collegiate Institute was omitted to avoid double-counting in the park inventory. E = The size and value of Lexington Paw Park (in acres and dollars) was reduced to represent only the areas dedicated to Town of Lexington parks and recreation uses (i.e., 1.10 acres / 8.90 acres = 12.4%). F = Site development costs (15%) are assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. C = Virginia Hylton Park and the Icehouse Amphitheater share the same TMS number; therefore, the land value for the Icehouse Amphitheater was omitted to avoid double-counting in the park inventory. Table D.2 − Recreation Building Replacement Values Building Type Park Name Location Year Built A Size (sq. ft.) A Building Valuation A Professional Services (10%) B Parks Office Virginia Hylton Park 209 S. Lake Drive 1985 1,200 $69,214 $6,921 Parks Storage Office Virginia Hylton Park 503 S. Lake Drive 1987 ―C $26,373 $2,637 Public Restrooms Corley Street Park 210 Corley Street ―C ―C $37,389 $3,739 Public Restrooms Caractor Park 804 Hendrix Street ―C ―C $54,384 $5,438 Public Restrooms Gibson Pond Park 241 Gibson Road ―C ―C $151,822 $15,182 Amphitheater Icehouse Amphitheater 107 W. Main Street 2016 10,500 $2,289,172 $228,917 Public Restrooms Icehouse Amphitheater 107 W. Main Street 2016 1,740 $1,127,772 $112,777 Community Building Palmetto Collegiate Institute 104 Hendrix Street 1950 1,838 $829,519 $82,952 Notes: Totals 15,278 $4,585,645 $458,563 C = Data not available in the South Carolina Municipal Insurance and Risk Financing Fund for the Town of Lexington, Property Schedule, provided by Town officials on October 31, 2024. B = A professional services allowance (10%) is assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. A = Year built, size, and building valuation statistics were captured from information published in the South Carolina Municipal Insurance and Risk Financing Fund for the Town of Lexington, Property Schedule, provided by Town officials on October 31, 2024. Town officials provided information missing in the table via department head interviews. Table D.3 − Park and Recreation Amenities Replacement Values Facility Type Park Location Valuation A Site Development Costs (15%) B Professional Services (10%) C Town Hall Gardens Virginia Hylton Park 209 S. Lake Drive $39,738 $5,961 $4,570 Gazebos (3) Virginia Hylton Park 209 S. Lake Drive $23,734 $3,560 $2,729 Veterans Memorial Monument Virginia Hylton Park 111 Maiden Lane $166,551 $24,983 $19,153 Decked Viewing Virginia Hylton Park 111 Maiden Lane $24,926 $3,739 $2,867 Playground Equipment Virginia Hylton Park 111 Maiden Lane $803,039 $120,456 $92,350 Pedestrian Bridges (3) Multiple Park Locations Multiple Park Locations $118,965 $17,845 $13,681 Stone Fountain Caractor Park 804 Hendrix Street $14,729 $2,209 $1,694 Fence Caractor Park 804 Hendrix Street $16,882 $2,532 $1,941 Picnic Shelter Caractor Park 804 Hendrix Street $8,693 $1,304 $1,000 Playground Equipment Caractor Park 804 Hendrix Street $8,951 $1,343 $1,029 Walkways Caractor Park 804 Hendrix Street $18,128 $2,719 $2,085 Rubber Play Surfaces Caractor Park 804 Hendrix Street $34,306 $5,146 $3,945 Small Shelter Gibson Pond Park 241 Gibson Road $26,059 $3,909 $2,997 Medium Shelter (3) Gibson Pond Park 241 Gibson Road $54,438 $8,166 $6,260 Large Shelter Gibson Pond Park 241 Gibson Road $168,849 $25,327 $19,418 Picnic Tables & Benches Gibson Pond Park 241 Gibson Road $52,118 $7,818 $5,994 Fencing Gibson Pond Park 241 Gibson Road $114,433 $17,165 $13,160 Covered Dock Gibson Pond Park 241 Gibson Road $13,916 $2,087 $1,600 Emergency Call Box Gibson Pond Park 241 Gibson Road $5,722 $858 $658 Seating Bowl and Sidewalk Icehouse Amphitheater 107 W. Main Street $506,000 $75,900 $58,190 Fence Icehouse Amphitheater 107 W. Main Street $189,098 $28,365 $21,746 Medium Shelter (2) Lexington Paw Park 989 Hendrix Street $13,284 $1,993 $1,528 Picnic Tables Multiple Park Locations Multiple Park Locations $292,031 $43,805 $33,584 Notes: $2,714,590 $407,190 $312,179 A = Facility valuation statistics were captured from information published in the South Carolina Municipal Insurance and Risk Financing Fund for the Town of Lexington, Property Schedule, provided by Town officials on October 31, 2024. B = Site development costs (15%) are assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. C = A professional services allowance (10%) is assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. Table D.4 − Trail System Replacement Values Parks with Walking Trails Trail Category A Miles of Trail A Facility Valuation B, C, D Site Development Costs (15%) E Professional Services (10%) F Old Lexington Mill Pond Trail Natural Trail 1.15 $145,728 $21,859 $16,759 Virginia Hylton Park Paved Trail 1.42 $419,866 $62,980 $48,285 Gibson Pond Park Trail Paved Trail 0.43 $127,142 $19,071 $14,621 Gibson Road Soccer Complex Trail Paved Trail 1.36 $402,125 $60,319 $46,244 Fourteen Mile Creek Trail Nature Tr ail & Boardwalk 1.70 $277,101 $41,565 $31,867 Totals 6.06 $1,371,962 $205,794 $157,776 Notes: A = Trail categories and trail lengths reported by the Town of Lexington Parks and Sanitation Department on November 26, 2024. F = A professional services allowance (10%) was assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. C = Cost per centerline mile for an eight-foot wide paved trail was estimated to be $295,680 per mile (i.e., $7 per square foot). E = Site development costs (15%) are assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. D = A facility valuation statistic for the Fourteen Mile Creek Trail was captured from information published in the South Carolina Municipal Insurance and Risk Financing Fund for the Town of Lexington, Property Schedule, provided by Town officials on October 31, 2024. B = Cost per centerline mile for an eight-foot wide natrual trail was estimated to be $126,720 per mile (i.e., $3 per square foot). Table D.5 − Inventory of Other Funding Sources for Parks & Recreation Facilities Between 2020 and 2024 A, B Awarding Agency Year Award Amount Project Federal Emergency Management Agency 2020 $2,489,201 Gibson Pond Dam Rebuild Private Donations 2024 $10,000 Virginia Hylton Park Award Total $2,499,201 Five-Year Average $499,840 Five-Year Forecast $2,499,201 Notes: A = Data used for the inventory of other funding sources was provided by the Town of Lexington Planning and Building Department on November 26, 2024. B = The town received $8,000,000 in Coronavirus State-Local Fiscal Recovery Funds in 2022 under the American Rescue Plan Act of 2021. The funds were omitted from this inventory of other funding sources because they were one-time funds received in response to a world-wide pandemic. It is believed the liklihood of a program of this magnitude being repeated again within the planning horizon for this analysis is very low. Table D.6 − Total Replacement Costs for the Parks & Recreation System Replacement Category Cost Fee Simple Land Value $4,326,413 Recreation Buildings $4,585,645 Park and Recreation Amenities $2,714,590 Trail System $1,371,962 Site Development Costs $1,261,946 Professional Services $1,426,057 Total Replacement Cost $15,686,613 Anticipated Offsets - Grant Funding Forecast (2024 to 2029) $2,499,201 NetTotal Replacement Cost $13,187,412 Cost per Capita Calculation Net Total Replacement Cost $13,187,412 Base Year Population (2023 Estimate) 24,921 Cost per Resident $529.17 Appendix Appendix A ─ State Enabling Legislation Appendix B ─ Town of Lexington Development Impact Fee Ordinance Appendix C ─ US Census Data and ITE Employee Space Ratio Calculations Appendix D ─ Parks & Recreation Inventory & Analysis Tables Appendix E ─ Municipal Facilities & Equipment Inventory & Analysis Tables Appendix F ─ Transportation Inventory & Analysis Tables Table E.1 − Municipal Facilities & Equipment Land Replacement Values Facility Type TMS Number Location Taxable Land Value A Acres Site Development Costs (15%) B Professional Services (10%) C Municipal Complex D 004320-09-010 111 Maiden Lane $416,355 1.94 $62,453 $47,881 Parks & Sanitation Office E 005420-03-002 503 S. Lake Drive ―― ― ― Signal Shop F 004300-08-022 979 Hendrix Street ―― ― ― Police Substation (Hope Ferry Shopping Center) G 004496-02-101 5179 Sunset Boulevard ―― ― ― Totals $416,355 1.94 $62,453 $47,881 Notes: G = The police substation in Hope Ferry Shopping Center is a leased facility; therefore, the land cost was omitted from the inventory. B = Site development costs (15%) are assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the Sou th Carolina Development Impact Fee Act. A = Taxable Land Values were collected from the County of Lexington Property Tax Search website (https ://www.lex-co.com/PropSearch/#/property) on November 27, 2024. C = A professional services allowance (10%) is assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. D = The parcel with the Municipal Complex on it includes 21.25 total acres. It is assumed 14.97 acres are used for park and rec reation uses, and 6.28 acres are used for municipal government uses. It was also assumed 31% of the property used for municipa l government uses (6.28 acres) was used for municipal facilities and equipment associated with growth-related departments (i.e., 6.28 acres x 31% = 1.94 acres). See Table D.6 − Lexington Town Hall Floor Area Space Allocation for an inventory of growth-related department calculations. E = The parks and sanitation office building is located on the same site as the Town of Lexington Utilities Department, which is not a department recongized for the calculations performed for the municipal facilities and equipment impact fee category. Therefore, the land cost associated with the Town's public works office was omitted from the inventory. F = The signal shop building is located on the same site as a water tower for the Town of Lexington Utilities Department, which is not a department recongized for the calculations performed for the municipal facilities and equipment impact fee category. Therefore, the land cost associated with the Town's signal shop was omitted from the inventory. Table E.2 − Municipal Facility Building Replacement Values Building Type Location Size (sq. ft.) A Building Valuation A Professional Services (10%) B Municipal Complex C 111 Maiden Lane 24,772 $4,223,749 $422,375 Public Works Office 503 S. Lake Drive 1,800 $135,502 $13,550 Pole Storage Building 503 S. Lake Drive ― D $11,248 $1,125 Signal Shop 979 Hendrix Street 300 $23,436 $2,344 Police Substation (Hope Ferry Shopping Center) 5179 Sunset Boulevard ― E ―E ―E Notes: 26,872 $4,393,935 $439,394 A = Building valuation statistics were captured from information published in the South Carolina Municipal Insurance and Risk Financing Fund for the Town of Lexington, Property Schedule, provided by Town officials on October 31, 2024. Town officials provided information missing in the table via department head interviews. B = Professional services allowance (10%) assumed as part of "system improvements costs" summarized in Section 6-1-920(22) of the South Carolina Development Impact Fee Act. C = The size and value of this building (in building square feet and in dollars) was reduced to approximate the areas dedicated to municipal facilities and equipment (i.e., 80,000 square feet x 31% = 24,772 square feet and $13,624,996 x 31% = $4,223,749). See table entitled "Lexington Municipal Complex Floor Plan" for a breakdown of growth vs. non-growth related department calculations. Table E.3 − Municipal Vehicles and Equipment Replacement Values Make Model Year Vehicle Cost A Caiman MRAP 4x4 Armored Personnel Carrier Vehicle 2012 $740,168 Tymco Street Sweeper W/20 2020 $182,237 Ram 5500 Maintenance Truck 2015 $125,866 Unknown Brush Hawg 2021 $169,928 Finn Material Blower Truck 2022 $139,884 N/A Target System for Police Firing Range 2016 $129,200 Totals $1,487,283 Note: A = Vehicle cost statistics were captured from information published in an assets inventory report generated by the Town of Lexington Finance Department on October 30, 2024. Table E.4 − Inventory of Other Funding Sources for Municipal Facilities & Equipment Between 2020 and 2024 A Awarding Agency Year Award Amount Project Unknown 2014 $733,000 MRAP 4x4 Armored Personnel Carrier Vehicle Award Total $733,000 Five-Year Average $146,600 Five-Year Forecast $733,000 Notes: A = Data used for the inventory of other funding sources was provided by the Town of Lexington Planning and Building Department on November 26, 2024. Table E.5 − Total Replacement Costs for Municipal Facilities and Equipment Replacement Category Cost Fee Simple Land Value $416,355 Municipal Buildings $4,393,935 Site Development Costs $62,453 Professional Services $487,275 Municipal Vehicles and Equipement $1,487,283 Total Replacement Cost $6,847,301 Anticipated Offsets - Grant Funding Forecast (2024 to 2029) $733,000 Net Total Replacement Cost $6,114,301 Total Replacement Cost $6,114,301 Resident Share 59% Employee Share 41% Total Replacement Cost for Residents $3,633,154 Total Replacement Cost for Employees $2,481,147 Cost per Resident $145.79 Cost per Employee $145.79 Table E.6 − Lexington Town Hall Floor Area Space Allocation Growth-Impacted Department A, B Square Feet in Town Hall Police 17,701 Planning, Building & Technology 4,518 Parks & Sanitation 1,398 Streets and Transportation 1,155 Total for All Growth-Impacted Departments 24,772 Total Square Feet in Town Hall 80,000 Percent of Floor Area Eligible for Impact Fee Funding 31% Notes: A = The municipal facilities and equipment impact fee category includes departments that are assumed to increase their needs for providing services proportionately as the town continues to grow: police protection; planning, building and technology; parks and sanitation; and streets and transportation. B = The allocation of square feet in Town Hall to growth-impacted departments identified for the development impact fee study was provided by the Town of Lexington Planning and Building Department on November 26, 2024. Appendix Appendix A ─ State Enabling Legislation Appendix B ─ Town of Lexington Development Impact Fee Ordinance Appendix C ─ US Census Data and ITE Employee Space Ratio Calculations Appendix D ─ Parks & Recreation Inventory & Analysis Tables Appendix E ─ Municipal Facilities & Equipment Inventory & Analysis Tables Appendix F ─ Transportation Inventory & Analysis Tables ROUTE SEGMENT SCDOT STATION NUMBER 2023 AADT 10 YEAR GROWTH ANNUAL RATE 2033 AADT PROJECTION Town Limits US 1 (W Main St) FROM US 378 (NO NAME), S- 176 TO US 378 (W MAIN ST), S- 52LEXINGTON COUNTY STA 117 117 47700 3.7 68600 Y US 1 (W Main St) FROM US 378 (W MAIN ST), S- 52 TO SC 6 (N LAKE DR)LEXINGTON COUNTY STA 119 119 20100 1.9 24260 Y US 1 (W Main St) FROM SC 6 (N LAKE DR) TO I- 20 (INTERSTATE 20)LEXINGTON COUNTY STA 121 121 29500 0.7 31630 Y US 1 (N Church St) FROM US 1 (W MAIN ST) TO SC 6 (N LAKE DR)LEXINGTON COUNTY STA 130 130 8500 10.3 22660 Y US 378 (Columbia Ave) FROM US 1 (W MAIN ST), S- 52 TO SC 6 (N LAKE DR)LEXINGTON COUNTY STA 177 177 32900 2 40100 Y US 378 (N Lake Dr) FROM SC 6 (N LAKE DR) TO S- 298 (ABBIE LN), S- 392LEXINGTON COUNTY STA 179 179 49700 2.8 65510 Y US 378 (Sunset Blvd) FROM S- 298 (ABBIE LN), S- 392 TO S- 485 (OLD CHEROKEE RD), L- 2271LEXINGTON COUNTY STA 180180 36800 1.4 42290 Y US 378 (Sunset Blvd) FROM S- 485 (OLD CHEROKEE RD), L- 2271 TO S- 28 (HOPE FERRY RD), L- 6517LEXINGTON COUNTY STA 181181 40400 1.2 45520 Y US 378 (Sunset Blvd) FROM S- 28 (HOPE FERRY RD), L- 6517 TO I- 20 (INTERSTATE 20)LEXINGTON COUNTY STA 183 183 33000 0.5 34690 Y SC 6 (N Lake Dr) FROM US 378 (COLUMBIA AVE) TO US 1 CON (N CHURCH ST)LEXINGTON COUNTY STA 217 215 18600 2.5 23810 Y SC 6 (N Lake Dr) FROM S- 68 (CORLEY MILL RD), L- 5105 TO US 378 (N LAKE DR)LEXINGTON COUNTY STA 215 217 16100 2.7 21020 Y SC 6 (S Lake Dr) FROM S- 116 (MAIDEN LN) TO I- 20 (INTERSTATE 20)LEXINGTON COUNTY STA 219 219 23800 2 29010 Y SC 6 (N Lake Dr) FROM US 1 CON (N CHURCH ST) TO US 1 (E MAIN ST)LEXINGTON COUNTY STA 234 234 5500 0 5500 Y S-32-1207 (Wildlife Rd) FROM S- 77 (BARR RD) TO S- 626 (INDUSTRIAL DR)LEXINGTON COUNTY STA 421 421 5400 5.1 8880 Y S-32-485 (Old Cherokee Rd) FROM SC 6 (N LAKE DR) TO S- 408 (OLD CHEROKEE RD)LEXINGTON COUNTY STA 425 425 9400 0.5 9880 Y S-32-28 (Andrew Corley Rd) FROM SC 6 (N LAKE DR) TO S- 738 (ANDREW CORLEY RD)LEXINGTON COUNTY STA 429 429 6900 1.6 8090 Y S-32-28 (Hope Ferry Rd) FROM S- 874 (HOPE FERRY RD) TO US 378 (SUNSET BLVD)LEXINGTON COUNTY STA 434 434 8500 5.1 13980 Y S-32-626 (Industrial Dr) FROM S- 1448 (ZENKER RD) TO SC 6 (S LAKE DR)LEXINGTON COUNTY STA 467 467 8100 0.8 8770 Y S-32-626 (Industrial Drive) FROM S- 70 (TWO NOTCH RD) TO S- 1448 (ZENKER RD)LEXINGTON COUNTY STA 468 468 3900 2 4750 Y S-32-68 (Corley Mill Rd) FROM US 378 (SUNSET BLVD) TO S- 916 (MILL STREAM RD)LEXINGTON COUNTY STA 663 663 13600 4.1 20330 Y S-32-52 (Old Chapin Rd) FROM US 1 (W MAIN ST), US 378 TO S- 145 (MAXIE RD)LEXINGTON COUNTY STA 665 665 9300 1.6 10900 Y S-32-176 (Gibson Rd) FROM US 1 (W MAIN ST) TO S- 324 (ROBERTS ST), S- 1680LEXINGTON COUNTY STA 673 673 7500 0.6 7960 Y S-32-176 (Gibson Rd) FROM S- 324 (ROBERTS ST), S- 1680 TO S- 91 (GIBSON RD)LEXINGTON COUNTY STA 675 675 4700 0.5 4940 Y S-32-43 (Hendrix St) FROM S- 77 (BARR RD) TO S- 176 (GIBSON RD)LEXINGTON COUNTY STA 681 681 2900 3.8 4210 Y S-32-61 (Harmon St) FROM S- 325 (DREHER ST) TO US 1 (E MAIN ST)LEXINGTON COUNTY STA 689 689 3700 0.5 3890 Y S-32-392 (Northwood Rd) FROM US 378 (N LAKE DR) TO S- 860 (LAUREL BLUFF DR)LEXINGTON COUNTY STA 691 691 3800 1.7 4500 Y S-32-91 (Gibson Rd) FROM SC 6 (S LAKE DR) TO S- 176 (GIBSON RD)LEXINGTON COUNTY STA 695 695 5900 0.5 6200 Y S-32-91 (S Church St) FROM S- 176 (GIBSON RD) TO S- 256 (ELM ST)LEXINGTON COUNTY STA 697 697 1750 0.6 1860 Y S-32-91 (S Church St) FROM S- 256 (ELM ST) TO S- 116 (MAIDEN LN)LEXINGTON COUNTY STA 699 699 5900 1.1 6580 Y S-32-91 (S Church St) FROM S- 116 (MAIDEN LN) TO US 1 (W MAIN ST)LEXINGTON COUNTY STA 700 700 9600 0 9600 Y L-32-121 (Berly St) FROM S- 131 (W BUTLER ST) TO US 378 (COLUMBIA AVE)LEXINGTON COUNTY STA 701 701 400 0.5 420 Y S-32-178 (Corley St) FROM SC 6 (N LAKE DR) TO S- 61 (HARMON ST)LEXINGTON COUNTY STA 703 703 750 0.5 790 Y S-32-324 (Roberts St) FROM S- 91 (S CHURCH ST) TO SC 6 (S LAKE DR)LEXINGTON COUNTY STA 707 707 2900 3.3 4010 Y S-32-256 (Elm St) FROM S- 324 (ROBERTS ST) TO S- 91 (S CHURCH ST)LEXINGTON COUNTY STA 709 709 800 0.5 840 Y S-32-132 (Christie St) FROM SC 6 (S LAKE DR) TO S- 337 (SWARTZ RD)LEXINGTON COUNTY STA 711 711 1250 0.5 1310 Y S-32-638 (Reed Ave) FROM S- 392 (NORTHWOOD RD) TO S- 52 (OLD CHAPIN RD)LEXINGTON COUNTY STA 715 715 1950 0.5 2050 Y S-32-131 (W Butler St) FROM US 1 CON (N CHURCH ST) TO US 378 (COLUMBIA AVE)LEXINGTON COUNTY STA 719 719 1650 0.5 1730 Y S-32-167 (Cedarcrest Dr) FROM S- 70 (TWO NOTCH RD) TO US 1 (AUGUSTA RD)LEXINGTON COUNTY STA 829 829 6500 1.5 7540 Y Total 2023 link AADT within Town Limits 489650 Total 2033 links AADT within Town Limits 608610 Town of Lexington Route Segments West Main Street (US 1)/Columbia Avenue (US 378) and Old Chapin Road South Lake Drive (SC 6) and Industrial Drive/Glassmaster Road West Main Street (US 1/378) and Park Road/Black Avenue South Lake Drive (SC 6) and Vera Road/Railroad Avenue Sunset Boulevard (US 378) and Hope Ferry Road/Tom Corley PlaceAugusta Highway (US 1) and Barr RoadSouth Lake Drive (SC 6) and Roberts Street Construction Cost 727,531.93$ 1,647,437.64$ 1,249,378.30$ 832,922.06$ 590,041.70$ 1,318,736.51$ 226,664.60$ CE&I 94,579.15$ 214,166.89$ 162,419.18$ 108,279.87$ 76,705.42$ 171,435.75$ 29,466.40$ PE 181,882.98$ 411,859.41$ 312,344.57$ 208,230.52$ 147,510.43$ 329,684.13$ 56,666.15$ ROW -$ 176,700.00$ 130,475.00$ -$ -$ 391,200.00$ 63,740.00$ Total 1,003,994.07$ 2,450,163.94$ 1,854,617.05$ 1,149,432.45$ 814,257.55$ 2,211,056.38$ 376,537.15$ West Main Street (US 1/378) and Thompson Street/Food Lion Driveway Sunset Blvd (US 378) and Palmetto Park Boulevard Old Chapin Road and Rose Lake/Maxie Road Barr Road and Hendrix Road Sunset Boulevard (US 378) and Coventry Drive/Home Depot Gibson Road and Hendrix RoadEast Main Street (US 1) and Swartz Road Industrial Drive and Zenker Road Construction Cost 1,742,899.29$ 663,374.43$ $324,360.88 438,213.30$ 999,831.21$ 1,331,585.99$ 497,746.43$ 470,598.50$ CE&I 226,576.91$ 86,238.68$ $42,166.91 56,967.73$ 129,978.06$ 173,106.18$ 64,707.04$ 61,177.81$ PE 435,724.82$ 165,843.61$ $81,090.22 109,553.33$ 249,957.80$ 332,896.50$ 124,436.61$ 117,649.63$ ROW 16,725.00$ 149,120.00$ $161,125.00 245,940.00$ -$ 687,381.00$ 82,100.00$ 168,500.00$ Total 2,421,926.02$ 1,064,576.72$ 608,743.02$ 850,674.36$ 1,379,767.07$ 2,524,969.67$ 768,990.08$ 817,925.93$ 2025 Dollars 2035 Dollars LTIP 2.0 Project Cost Total (Within Town Limits) 20,297,631.45$ 12% Annual Cost Escalation 63,041,362.26$ 489650 608610 Cost per trip* 125.76$ * AADT Values from Town of Lexington Route Segment AADT Calculations Spreadsheet *Total 2023 links AADT within Town Limits *Total 2033 links AADT within Town Limits LTIP 2.0 Projects Within Town Limits and Associated Cost Town of Lexington, SC April 14, 2026 Final Document Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding City Explained Inc. Final Document 1 April 14, 2026 INTRODUCTION The Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding in the Town of Lexington (CIP) summarizes a list of major capital projects, equipment purchases, or vehicle purchases identified to increase system capacity, and keep pace with continued growth and development anticipated for the town as it serves the needs of future residents and employees with new parks, recreation facilities, municipal facilities and their related equipment, or new and expanded roads and intersections. Items included in the CIP reflect both short- and long-term investments in local infrastructure to maintain minimum service delivery standards established for the town. The CIP was developed for a five-year planning period and should be updated annually. The CIP was prepared consistent with the analysis, assumptions, conclusions, and recommendations presented in the Development Impact Fee Study Update Report for the Town of Lexington dated April 14, 2026. Together, the CIP and Development Impact Fee Study Update Report meet the rules and requirements set forth in Section 6-1-960 of the South Carolina Development Fee Act (the “Act”) for maintaining a local development impact fee program. WHAT IS A CIP? A Capital Improvements Plan (CIP) identifies major capital projects, equipment purchases, or vehicle purchases led by the town over a fixed period of time, usually multiple fiscal years, to meet anticipated capital needs. It identifies each capital project for which the town plans to undertake, and presents estimates of resources needed to finance the projects. CIP projects may be funded by local sources, such as property taxes, fees, or other revenue sources; or by outside sources, such as grants and appropriations; or by project financing (including general obligation or revenue bonds); or through cost-sharing agreements with other public or private entities. CIP projects are typically implemented, in whole or in part, as funds become available in each fiscal year’s budget. A CIP distributes costly projects over time, protecting the community from abrupt tax increases that might otherwise be required to fund them. Reviewing the CIP regularly improves planning for large projects and protects local government officials from being confronted by a sudden need for unplanned capital expenditures. Information presented in the CIP helps decision- makers coordinate improvements for greater efficiency, and assess short-term financing requirements in the context of long-term fiscal needs and constraints. Although a CIP extends over many years, it should be updated annually to reflect progress towards implementation and include more current information for planned expenditures and revenues. In many cases, the first year of the CIP becomes a component of the annual capital budget for the town that is submitted concurrently with the operating budget for consideration by the Town Council. A CIP may improve the town’s bond rating and lower interest costs over time because of demonstrated prudent fiscal management. Final Document 2 April 14, 2026 ELIGIBLE PROJECTS The CIP identifies major capital projects, equipment purchases, or vehicle purchases for which development impact fees may be used as a funding source. Three different impact fee categories are addressed in the CIP: parks and recreation, municipal facilities and equipment, and transportation. Capital improvements (projects) must have a useful life of five years or more, by new construction or other action, which increase the service capacity of the public facility included in the document. Equipment or vehicle purchases included in the document must represent an individual unit purchase price of not less than one hundred thousand dollars ($100,000) including, but not limited to, equipment and vehicles used in the delivery of public safety services, collection and disposal of solid waste, and storm water management and control. Traditional construction costs for capital projects may also include design, acquisition, engineering, and financing needs attributable to projects that qualify for development impact fee funding, provided those projects have been identified in the CIP. Revenues collected from impact fees must be maintained in separate, interest-bearing accounts and spending tracked specifically to expenditures in that category: parks and recreation, municipal facilities and equipment, and transportation. All monies not spent within three years of the date they are scheduled to be encumbered in the CIP must be returned to the owner of the property for which the impact fee was collected pursuant to the rules and requirements set forth in Article XV of the Development Impact Fee Ordinance for the Town of Lexington. EXPENDITURE CATEGORIES The cost of major capital projects presented in the CIP may be comprised of one or more categories, including professional services, land acquisition, site development, construction, equipment purchase, vehicle purchase, and bond debt service. Professional services may include, but are not limited to, planning, design, appraisal, and permitting needs associated with the project. Site development costs represent certain expenses associated with the primary use or structure planned for a site, including clearing, grading, lighting, parking, landscaping, utilities, storm water, etc. Bond debt service includes principal and interest payments, made by the town to a creditor, to pay back the monies loaned to complete the capital project. REVENUE CATEGORIES The revenue available to fund major capital projects, equipment purchases, or vehicle purchases may come from different sources, including the general fund, a capital projects fund, development impact fees (category specific to each project), grants and donations, and intergovernmental funds. Final Document 3 April 14, 2026 PROJECT DETAIL SHEETS A brief description of major capital projects, equipment purchases, or vehicle purchases presented in the CIP starts on the following page. The information presented includes a brief summary of the project; target year for implementation; attributed costs towards implementation; and potential funding sources for completing the project. The Development Impact Fee Study Update Report for the Town of Lexington dated April 14, 2026, used a consumption-driven methodology for calculating appropriate fees for the parks and recreation and municipal facilities and equipment categories. This methodology charges new residential and non-residential development the cost of replacing existing capacity on a one-for-one basis, assuming existing service delivery standards for each impact fee category. It is the policy of the Town Council that development impact fees for these two categories be used for eligible expenditures (capital project, equipment purchase, or vehicle purchase) that demonstrate an increase in the town’s capacity to meet the needs of future residents and employees in the category. New or expanded capital projects, equipment purchases, or vehicle purchases added to the CIP should be done in an open, publicly-noticed meeting. The Development Impact Fee Study Update Report for the Town of Lexington dated April 14, 2026, used an improvements-drive methodology for calculating appropriate fees for the town’s transportation impact fee, whereby the need and cost for providing new capacity in the system was influenced by traffic volumes, level of service capacities, and annual growth rates derived from analytical models or historical trends. Specific corridors impacted negatively by future growth and development in the study area were identified in the updated study report. It is the policy of the Town Council that development impact fees in this category may be used for eligible expenditures (capital projects) that increase capacity for the town’s transportation system in the corridors identified as eligible for impact fee funding in the updated study report. New capital projects added to the CIP should be done in an open, publicly-noticed meeting. PROJECT SCHEDULE Projects included in the CIP are presented by impact fee category. The schedule of projects presented herein, as amended and prioritized in the future, represents consensus for prioritizing capital improvements that increase capacity for the town’s parks and recreation, municipal facilities and equipment, and transportation systems. Start and end dates presented in the CIP schedule may be adjusted from time-to-time to account for unforeseen project realities. Parks and Recreation Project Name: Mill Pond Park Responsible Department: Parks and Recreation Establish a pavilion picnic grove/gathering space upstream of the Mill Pond at 503 S Lake Dr, to include renovation of existing water plant facilities for office/restrooms. This project includes all costs associated with implementation, including but not limited to planning, design, engineering, permitting, land preparation, clearing, grading, construction, and any necessary related improvements, as applicable. This project will be funded by development i mpact fees and other Governmental Funds collected for the parks and recreation category. Summary of Expenditures FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years $ - $100,000 $725,000 $825,000 $ - $ - Summary of Revenues Revenue Source FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years Impact Fees Revenue $ - $ - $5,000 $100,000 $ - $ - Other Governmental Funds $ - $100,000 $720,000 $725,000 $ - $ - Project costs and the timing of expenditures identified in this Capital Improvements Plan are estimates and are subject to ongoing review and periodic revision. Impact fees shall be expended on a first-in, first-out basis and will be used, to the extent practicable, to minimize the amount of project costs that must be financed. When financing is necessary, funding mechanisms may include bond anticipation notes and bonds, which may support multiple projects within the Impact Fee Capital Improvements Plan and may be combined with financing for other General Government capital projects. In addition to other eligible project costs, impact fees may be used to pay debt service on obligations issued to fund Impact Fee CIP projects, including project-related financing. Other available revenue sources may also be utilized to fund a portion or the full cost of identified projects. Project Description Funding Strategy Project Status Project Name: Gibson Pond Park Responsible Department: Parks and Recreation Convert existing gravel parking area into a permanent paved area with drainage improvements to meet Town Architectural and Appearance Standards. This project includes all costs associated with implementation, including but not limited to planning, design, engineering, permitting, land preparation, clearing, grading, construction, and any necessary related improvements, as applicable. This project will be funded by development impact fees collected for the parks and recreation category. Summary of Expenditures FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years $ - $50,000 $ - $ - $ - $ - Summary of Revenues Revenue Source FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years Impact Fees Revenue $ - $50,000 $ - $ - $ - $ - Other Governmental Funds $ - $ - $ - $ - $ - $ - Project costs and the timing of expenditures identified in this Capital Improvements Plan are estimates and are subject to ongoing review and periodic revision. Impact fees shall be expended on a first-in, first-out basis and will be used, to the extent practicable, to minimize the amount of project costs that must be financed. When financing is necessary, funding mechanisms may include bond anticipation notes and bonds, which may support multiple projects within the Impact Fee Capital Improvements Plan and may be combined with financing for other General Government capital projects. In addition to other eligible project costs, impact fees may be used to pay debt service on obligations issued to fund Impact Fee CIP projects, including project-related financing. Other available revenue sources may also be utilized to fund a portion or the full cost of identified projects. Project Description Funding Strategy Project Status Project Name: Future Park Responsible Department: Parks and Recreation This project provides for the acquisition, development, and potential expansion of parks and recreation facilities within Town limits, as determined necessary to meet current and future community needs. The project supports the continued growth of the Town’s parks and recreation system to accommodate population increases and maintain appropriate levels of service. This project is eligible for development impact fee funding, as it increases system capacity. This project includes all costs associated with implementation, including but not limited to planning, design, engineering, permitting, land acquisition, site preparation, clearing and grading, construction, and related improvements. This project will be funded by development impact fees collected for the parks and recreation category. Summary of Expenditures FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years $400,000 $ - $ - $ - $ - $ - Project costs and the timing of expenditures identified in this Capital Improvements Plan are estimates and are subject to ongoing review and periodic revision. Impact fees shall be expended on a first-in, first-out basis and will be used, to the extent practicable, to minimize the amount of project costs that must be financed. When financing is necessary, funding mechanisms may include bond anticipation notes and bonds, which may support multiple projects within the Impact Fee Capital Improvements Plan and may be combined with financing for other General Government capital projects. In addition to other eligible project costs, impact fees may be used to pay debt service on obligations issued to fund Impact Fee CIP projects, including project-related financing. Other available revenue sources may also be utilized to fund a portion or the full cost of identified projects. Summary of Revenues Revenue Source FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years Impact Fees Revenue $400,000 $ - $ - $ - $ - $ - Other Governmental Funds $ - $ - $ - $ - $ - $ - Project Description Funding Strategy Project Status Municipal Facilities and Equipment Project Name: North Church Street Parking Responsible Department: Municipal Facilities Construct a 100-space public parking facility within the Downtown Overlay District. This project includes all costs associated with implementation, including but not limited to planning, design, engineering, permitting, land preparation, clearing, grading, construction, and any necessary related improvements, as applicable. This project will be funded by development impact fees and other Governmental Funds collected for the municipal facilities category. Summary of Expenditures FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years $1,295,000 $ - $ - $ - $ - $ - Summary of Revenues Revenue Source FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years Impact Fees Revenue $75,000 $ - $ - $ - $ - $ - Other Governmental Funds $1,220,000 $ - $ - $ - $ - $ - Project costs and the timing of expenditures identified in this Capital Improvements Plan are estimates and are subject to ongoing review and periodic revision. Impact fees shall be expended on a first-in, first-out basis and will be used, to the extent practicable, to minimize the amount of project costs that must be financed. When financing is necessary, funding mechanisms may include bond anticipation notes and bonds, which may support multiple projects within the Impact Fee Capital Improvements Plan and may be combined with financing for other General Government capital projects. In addition to other eligible project costs, impact fees may be used to pay debt service on obligations issued to fund Impact Fee CIP projects, including project-related financing. Other available revenue sources may also be utilized to fund a portion or the full cost of identified projects. Project Description Funding Strategy Project Status Project Name: Bruner Road Covered Storage Responsible Department: Municipal Facilities Construct a covered storage facility at the Bruner Road Complex , located between the two existing storage facilities. This will house the Police Department's evidence storage and the Transportation Department's daily operations. This project includes all costs associated with implementation, including but not limited to planning, design, engineering, permitting, land preparation, clearing, grading, construction, and any necessary related improvements, as applicable. This project will be funded by development impact fees collected for the municipal facilities category. Summary of Expenditures FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years $ - $90,000 $1,300,000 $1,300,000 $ - $ - Summary of Revenues Revenue Source FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years Impact Fees Revenue $ - $90,000 $1,300,000 $1,300,000 $ - $ - Other Governmental Funds $ - $ - $ - $ - $ - $ - Project costs and the timing of expenditures identified in this Capital Improvements Plan are estimates and are subject to ongoing review and periodic revision. Impact fees shall be expended on a first-in, first-out basis and will be used, to the extent practicable, to minimize the amount of project costs that must be financed. When financing is necessary, funding mechanisms may include bond anticipation notes and bonds, which may support multiple projects within the Impact Fee Capital Improvements Plan and may be combined with financing for other General Government capital projects. In addition to other eligible project costs, impact fees may be used to pay debt service on obligations issued to fund Impact Fee CIP projects, including project-related financing. Other available revenue sources may also be utilized to fund a portion or the full cost of identified projects. Project Description Funding Strategy Project Status Project Name: Transportation Signal Shop Responsible Department: Municipal Facilities Establish a permanent Transportation Department street and signal divisions operational center. This project includes all costs associated with implementation, including but not limited to planning, design, engineering, permitting, land preparation, clearing, grading, construction, and any necessary related improvements , as applicable. This project will be funded by development impact fees and other Governmental Funds collected for the municipal facilities category. Summary of Expenditures FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years $ 1,600,000 $200,000 $200,000 $ - $ - $ - Project costs and the timing of expenditures identified in this Capital Improvements Plan are estimates and are subject to ongoing review and periodic revision. Impact fees shall be expended on a first-in, first-out basis and will be used, to the extent practicable, to minimize the amount of project costs that must be financed. When financing is necessary, funding mechanisms may include bond anticipation notes and bonds, which may support multiple projects within the Impact Fee Capital Improvements Plan and may be combined with financing for other General Government capital projects. In addition to other eligible project costs, impact fees may be used to pay debt service on obligations issued to fund Impact Fee CIP projects, including project-related financing. Other available revenue sources may also be utilized to fund a portion or the full cost of identified projects. Summary of Revenues Revenue Source FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years Impact Fees Revenue $100,000 $200,000 $200,000 $ - $ - $ - Other Governmental Funds $1,500,000 $ - $ - $ - $ - $ - Project Description Funding Strategy Project Status Project Name: Park Headquarters Responsible Department: Municipal Facilities Rebuild and/or renovate the existing Parks and Community Services center. This project includes all costs associated with implementation, including but not limited to planning, design, engineering, permitting, land preparation, clearing, grading, construction, and any necessary related improvements, as applicable. This project will be funded by development impact fees collected for the municipal facilities category. Project costs and the timing of expenditures identified in this Capital Improvements Plan are estimates and are subject to ongoing review and periodic revision. Impact fees shall be expended on a first-in, first-out basis and will be used, to the extent practicable, to minimize the amount of project costs that must be financed. When financing is necessary, funding mechanisms may include bond anticipation notes and bonds, which may support multiple projects within the Impact Fee Capital Improvements Plan and may be combined with financing for other General Government capital projects. In addition to other eligible project costs, impact fees may be used to pay debt service on obligations issued to fund Impact Fee CIP projects, including project-related financing. Other available revenue sources may also be utilized to fund a portion or the full cost of identified projects. Summary of Expenditures FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years $ - $100,000 $1,850,000 $1,850,000 $ - $ - Summary of Revenues Revenue Source FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years Impact Fees Revenue $ - $100,000 $1,850,000 $1,850,000 $ - $ - Other Governmental Funds $ - $ - $ - $ - $ - $ - Project Description Funding Strategy Project Status Transportation Project Name: Gibson and West Main @ 378 Responsible Department: Transportation Construct proposed improvements at the intersection of West Main Street (US 1/US 378) and Gibson Road (S - 176) to include an additional US 378 southbound lane, an additional eastbound right -turn lane on US 1, and a northbound left -turn lane on Gibson Road. This project includes all costs associated with implementation, including but not limited to planning, design, engineering, permitting, land preparation, clearing, grading, construction, and any necessary related improvements, as applicable. This project will be funded by development impact fees collected for the transportation category. Summary of Expenditures FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years $1,000,000 $700,000 $ - $ - $ - $ - Summary of Revenues Revenue Source FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 Future Years Impact Fees Revenue $1,000,000 $700,000 $ - $ - $ - $ - Other Governmental Funds $ - $ - $ - $ - $ - $ - Project costs and the timing of expenditures identified in this Capital Improvements Plan are estimates and are subject to ongoing review and periodic revision. Impact fees shall be expended on a first-in, first-out basis and will be used, to the extent practicable, to minimize the amount of project costs that must be financed. When financing is necessary, funding mechanisms may include bond anticipation notes and bonds, which may support multiple projects within the Impact Fee Capital Improvements Plan and may be combined with financing for other General Government capital projects. In addition to other eligible project costs, impact fees may be used to pay debt service on obligations issued to fund Impact Fee CIP projects, including project-related financing. Other available revenue sources may also be utilized to fund a portion or the full cost of identified projects. Project Description Funding Strategy Project Status AN ORDINANCE OF THE TOWN OF LEXINGTON, SOUTH CAROLINA, ESTABLISHING DEVELOPMENT IMPACT FEES ARTICLE I. TITLE This ordinance shall be referred to as the "Development Impact Fee Ordinance for the Town of Lexington, South Carolina". ARTICLE II. AUTHORITY This ordinance is adopted pursuant to and in compliance with the authority of the South Carolina Development Impact Fee Act. Code of Laws of South Carolina, Title 6, Article 9, Chapter 1 (the "Act"), and is to be interpreted in accordance with such Act, or as it may be amended in the future. ARTICLE Ill. FINDINGS The Lexington Town Council hereby declares that: (a) Adequate parks and recreation facilities, municipal facilities and equipment, and a transportation system are vital and necessary to the health, safety, welfare, and prosperity of the Town and its citizens. Substantial growth and new construction is taking place within the Town and is anticipated to continue. This growth creates substantial need for new infrastructure capacity. Meeting these needs is very costly; however, failure to do so will result in an inadequate system of facilities and equipment to accommodate anticipated demand. This would make the Town a less desirable place to live and do business and be detrimental to the health, safety, welfare, and prosperity of the Town and its citizens. (b) To the extent that future growth and new construction in the Town place demands on parks and recreation facilities, municipal facilities and equipment, or the transportation system those demands and needs should be met by shifting a portion of the capital costs for providing new capacity to serve new development, which creates, in whole or in part, these demands and needs. (c) By Resolution adopted on March 4, 2019, the Town Council directed the Planning Commission to conduct the necessary studies and develop a recommended development impact fee ordinance in accordance with the requirements of the Act. On November 20, 2024, and DATE, the Town Administrator directed the Planning Commission to review and provide recommendations for changes to the development impact fee ordinance in accordance with the requirements of Article XVI herein and the Act (i.e. the five-year review cycle). (d) The Planning Commission recommended to Town Council the new Development Impact Fee Study Update Report for Lexington dated April 14, 2026, the new Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding in Lexington dated April 14, 2026, and the new Housing Affordability Analysis in Support of a Development Impact Fee Study Update Report in Lexington dated April 14, 2026, each of which have been adopted by the Town Council, as modified, on DATE, to augment the original documents dated August 30, 2019 and the updated documents dated December 9, 2024. (e) This ordinance is enacted to implement the findings and recommendations of the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, and endorse the list of projects in the Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding in Lexington dated April 14, 2026, referenced in subparagraph (d) above. (f) The impact fees prescribed in this ordinance are equitable, do not impose an unfair or disproportionate burden on developers and new construction, and are in the best interests of the general welfare of the Town of Lexington and its citizens. (g) New facilities or equipment eligible for development impact fee funding will benefit all new development or redevelopment in Town limits. Therefore, it is appropriate to treat the entire town as one service area for calculating, collecting, and spending development impact fees. (h) This ordinance provides the procedures for timely processing of applications for determination of appropriate development impact fees applicable to all development inside Town limits subject to the development impact fees, and for the timely processing of applications for individual assessment of development impact fees, credits, or reimbursements allowed or paid. (i) The transportation impact fees presented in Exhibit A of this ordinance reflect the Town's commitment to provide road capacity for future vehicle trips using maximum service capacities defined by the Transportation Research Board’s Highway Capacity Manual, 6th Edition, based on average daily traffic volumes and measurements. (j) The maximum allowable parks and recreation impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, has been reduced by zero percent for the General Development Impact Fee Schedule summarized in Exhibit A of this ordinance, setting the fees at 100 percent of the maximum amount to provide a reasonable fee for residential investment and to ensure that the impact fees collected do not exceed the cost to provide capital facilities that accommodate new development. (k) The maximum allowable municipal facilities and equipment impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, has been reduced by zero percent for the General Development Impact Fee Schedule summarized in Exhibit A of this ordinance, setting the fees at 100 percent of the maximum amount to provide a reasonable fee for residential and non-residential investments and to ensure that the impact fees collected do not exceed the cost to provide capital facilities and equipment that accommodate new development. (I) The maximum allowable transportation impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, has been reduced by zero percent for the General Development Impact Fee Schedule summarized in Exhibit A of this ordinance, setting the fees at 100 percent of the maximum amount to provide a reasonable fee for residential and non-residential investments and to ensure that the impact fees collected do not exceed the cost to provide capital transportation facilities that accommodate new development. (m) Property for which a valid building permit or development approval was issued between February 1, 2020, and DATE, shall not be subject to the updated development impact fee amounts (instead paying development impact fee amounts in effect at the time the valid building permit or development approval was rendered). ARTICLE IV. DEFINITIONS The following definitions apply within this ordinance consistent with the provisions set forth in the South Carolina Development Impact Fee Act, or as it may be amended in the future. Where terms are not defined, the definitions used in the Town of Lexington Code of Ordinances shall apply. (a) Affordable Housing. Housing that is affordable to families whose incomes do not exceed eighty percent (80%) of the median income for the service zone established for the Town of Lexington. (b) Building Permit. A permit issued by the Town permitting the construction of a building or structure within Town limits. (c) Capital Improvement. Improvements with a useful life of five years or more, by new construction or other action, which increase the service capacity of the public facility. Public facilities for the purpose of this ordinance include parks and recreation facilities, municipal facilities and equipment, and transportation. (d) Capital Improvements Plan (CIP). A multi-year planning tool used to identify capital projects and coordinate financing and implementation. The Plan also identifies capital improvements for which impact fees may be used as a funding source. (e) Certificate of Occupancy. A certificate allowing the occupancy or use of a building and certifying that the structure or use has been constructed or will be used in compliance with the Town of Lexington Code of Ordinances and all other applicable regulations. (f) Credits. Impact fee deductions allowed to a fee payor for eligible off-site capital improvements funded by the fee payor. Off-site capital improvements that are a direct result of a specific development are not eligible for credits. An improvement shall be determined to be a direct result if it is required, if it benefits primarily the specific development, and if it is contiguous to or in the immediate proximity of the specific development. (g) Developer. An individual, corporation, partnership, or other legal entity undertaking new development. (h) Development. Construction or installation of a new building or structure, or a change in use of an existing building or structure, any of which creates additional demand and need for public facilities (i.e., parks and recreation, municipal facilities and equipment, or transportation). A building or structure shall include, but not be limited to, modular buildings and manufactured housing. Development does not include alterations made to existing single-family homes. (i) Development Impact Fee. A financial payment made by a developer to a local government for funding certain off-site capital improvements identified to accommodate future growth. Development impact fees (or "impact fees") are collected by the Town for parks and recreation facilities, municipal facilities and equipment, and transportation. (j) Fee payor. A developer that pays or is required to pay a development impact fee. (k) Municipal Facilities and Equipment Impact Fee. A payment of money imposed as a condition of approval to pay a proportionate share of the cost for improvements to the municipal facilities and equipment system identified to serve new development. (I) Off-Site Improvements. Capital improvements located outside of the boundaries of a development that are required to serve the development's demands and needs. (m) Parks and Recreation Impact Fee. A payment of money imposed as a condition of approval to pay a proportionate share of the cost for improvements to the parks and recreation system identified to serve new development. (n) Public Facilities. Improvements to and/or construction of capital improvements identified in the Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding in Lexington dated April 14, 2026, and the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, as described in Article V hereof. Public facilities for the purpose of this ordinance shall include parks and recreation facilities, municipal facilities and equipment, and transportation. (o) Square Feet (s.f.). As referred to in Exhibit A of this ordinance, means the sum (in square feet) of the area of each floor level, including cellars, basements, mezzanines, penthouses, corridors, lobbies, stores and offices, that are within the principal outside faces of exterior walls, not including architectural setbacks or projections. Included are all areas that have floor surfaces with clear standing head room (measured 6 foot, 6 inches minimum) regardless of their use. If a ground-level area of a building, or part thereof, within the principal outside faces of the exterior walls is not enclosed, this square footage definition considers it part of the overall square footage for the building. However, unroofed areas and unenclosed roofed-over spaces, except those contained within the principle outside faces of exterior walls, should be excluded from the area measurement. The area of any parking garage within a building shall not be included in the area measurement. (p) System Improvement. A capital improvement to a public facility which is designed to provide service to a service area. (q) System Improvement Costs. The costs incurred for construction and reconstruction of system improvements, including design, acquisition, engineering, and other costs attributable to the improvements, and also including the cost of providing additional public facilities needed to serve new growth and development. System improvement costs do not include: (1) construction, acquisition, or expansion of public facilities other than capital improvements eligible for development impact fee funding that are identified in the Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding in Lexington dated April 14, 2026, as amended and prioritized therein; (2) repair, operation, or maintenance of existing or new capital improvements; (3) upgrading, updating, expanding, or replacing existing capital improvements to serve existing development in order to meet stricter safety, efficiency, environmental, or regulatory standards; (4) upgrading, updating, expanding, or replacing existing capital improvements to provide better service to existing development; (5) administrative and operating costs of the governmental entity; or (6) principle payments and interest or other finance charges on bonds or other indebtedness except financial obligations issued by or on behalf of the governmental entity to finance capital improvements eligible for impact fee funding that are identified in the Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding in Lexington dated April 14, 2026, as amended and prioritized therein. (r) Transportation Impact Fee. A payment of money imposed as a condition of approval to pay a proportionate share of the cost for improvements to the transportation system identified to serve new development. (s) Volume to Service Capacity Ratio. A measurement of the relationship between average daily traffic volumes (demand) and average daily maximum service capacities (supply) for transportation facilities in the Lexington Study Area. A volume to service capacity ratio greater than 1.00 identified the need for a capacity-enhancing improvement. ARTICLE V. SUPPORTING DOCUMENTATION This ordinance is based upon the conclusions and recommendations presented in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, the Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding in Lexington dated April 14, 2026, as amended and prioritized therein, and the Housing Affordability Analysis in Support of a Development Impact Fee Study Update in Lexington dated April 14, 2026, referenced in Article Ill, Section (d) of this ordinance. They were prepared consistent with the provisions set forth in the Act and adopted by Town Council on DATE. All documents are on file in the Town Planning and Building Department and are incorporated into this ordinance by reference. All development impact fees collected pursuant to this ordinance shall be used to implement any or all of the public facilities identified in the Capital Improvements Plan for Projects Eligible for Development Impact Fee Funding in Lexington dated April 14, 2026, as amended and prioritized therein. ARTICLE VI. JURISDICTION A development impact fee shall apply to all new development or redevelopment located within Town limits. ARTICLE VII. APPLICATION AND EXEMPTIONS The provisions of the ordinance shall apply to all new development or redevelopment within Town limits for which a building permit or development approval is required except for the following: (a) rebuilding the same amount of floor space of a structure that was destroyed by fire or other natural catastrophe; {b) remodeling or repairing a structure with the same land use that does not result in an increase in the number of service units or place new demand on parks and recreation facilities, municipal facilities and equipment, or the transportation system; (c) replacing a residential unit, including a manufactured home, with another residential unit on the same lot, unless it is demonstrated clearly that the new unit creates new demand for parks and recreation facilities, municipal facilities and equipment, or the transportation system; (d) placing a construction trailer or temporary office on a lot during the period of construction on the same lot; (e) construction of an addition to a residential structure that does not increase the amount of traffic generated by the same land use; (f) adding uses that are typically accessory to residential uses, such as a tennis court or a clubhouse, unless it is demonstrated clearly that the use creates new demand for parks and recreation facilities, municipal facilities and equipment, or the transportation system; (g) all or part of a particular development project if: (1) the project is determined to create affordable housing; and (2) the exempt development's proportionate share of system improvements is funded through a revenue source other than development impact fees. (h) constructing a new elementary, middle, or secondary school; and (i) constructing a new volunteer fire department. ARTICLE VIII. PROVISIONS FOR AFFORDABLE HOUSING Because all or part of any particular development project may be exempt from development impact fees for affordable housing, the following sets forth the administrative standards for determining what constitutes affordable housing and the procedures for exemption from one or more development impact fees. Section 8.1 Median Family Income Affordable housing is based upon eighty percent (80%) of the median family income for residents living within the Town of Lexington. Median family income shall be determined once a year utilizing the following procedure: (a) the most recently available figures from the US Census Bureau American Community Survey will serve as the base year for this evaluation; (b) each subsequent year will be adjusted once annually thereafter during January of the calendar year based upon the previous year's published Consumer Price Index (CPI} increase, until the next US Census Bureau data set is published and this procedure is replicated. Section 8.2 Maximum Expenditure The maximum expenditure for housing costs shall correspond to the Fannie Mae Foundation Mortgage Calculator multiplier of thirty percent (30%) of gross family income as used in the Housing Affordability Analysis in Support of a Development Impact Fee Study Update in Lexington. Affordable housing based upon eighty percent (80%) of median family income is: (a) Multifamily rental dwelling units of which the gross monthly rent cost does not exceed thirty percent (30%) of eighty percent (80%) of the gross median family monthly income. (b) Fee simple ownership dwelling units of which the cost of homeownership for the dwelling unit do not exceed thirty percent (30%) of eighty percent (80%) of the gross median family monthly income as reflected in the sales price using the Fannie Mae Foundation Mortgage Calculator (or comparable methodology) assuming a 20% down payment and a specified interest rate. The specified interest rate shall be determined by selecting the lowest 30-year fixed mortgage rate reported by area lending institutions as of the first week of January for any given year and shall remain so for the balance of the year. Section 8.3 Procedures for Exemption from Development Impact Fees (a) A developer seeking exemption from one or more development impact fees for the construction of affordable multifamily rental dwelling units must identify the alternate source of funds for the impact fee and post a financial guarantee suitable to the Town prior to the issuance of a building permit. The amount of the financial guarantee shall reflect the amount of development impact fees due for all affordable housing units as if they were not affordable housing units. No Certificate of Occupancy for any of the units may be issued until the impact fees for the affordable housing units have been paid by the alternate source or from the proceeds of the financial guarantee. (b) A developer seeking exemption from one or more development impact fees for construction of a fee simple ownership dwelling unit shall identify the alternate source of funds for the impact fees and post a financial guarantee suitable to the Town prior to the issuance of a building permit. The amount of the financial guarantee shall reflect the amount of development impact fees due for all affordable housing units as if they were not affordable housing units. No Certificate of Occupancy may be issued for the affordable housing dwellings until the impact fees have been paid by the alternate source or from the proceeds of the financial guarantee. ARTICLE IX. DETERMINATION OF FEES Section 9.1 General Provisions (a) The Town Administrator, or its designee shall determine and collect all development impact fees administered within Town limits. (b) Upon the effective date of this ordinance, development impact fees shall be charged to new development or redevelopment in accordance with the procedures set forth in this ordinance. The fees to be collected for a development will be determined at the time of application for a building permit. If the development is one that does not require a building permit, the impact fee for the development will be determined at the time of development approval. No building permit or development approval shall be issued for any development requiring the payment of development impact fees until the fees have been remitted to the Town Administrator, or its designee, or in the case of affordable housing, the appropriate financial guarantees have been filed with the Town Administrator. Payment of such fees shall not relieve the developer from obligations to comply with any other applicable Town ordinances, regulations, or requirements including, but not limited to, the "Zoning", "Land Development", "Subdivisions", or "Buildings and Building Regulations" Chapters of the Town of Lexington Code of Ordinances prior to receiving a Certificate of Occupancy. (c) All monies paid by the fee payor pursuant to this ordinance shall be identified as development impact fees and promptly deposited in the appropriate development impact fee trust fund described under Article X of this ordinance. (d) For the purpose of calculating development impact fees, the land use types assumed in the General Development Impact Fee Schedule of this ordinance (i.e., Exhibit A) shall be defined in accordance with the definitions contained in the Institute of Transportation Engineers' Trip Generation Manual, Tenth Edition. (e) Payment of development impact fees according to the General Development Impact Fee Schedule (i.e., Exhibit A), or independent impact fee calculation study accepted by Town Council, shall constitute full and complete payment of the new development's proportionate share of public facilities costs. (f) A developer may negotiate and contract with the Town to provide facilities or services in lieu of payment of development impact fees in accordance with Section 6-1-1050 of the Act. These services or facilities are not required to be in the capital improvements plan. Section 9.2 Parks and Recreation Impact Fee Formula Parks and recreation impact fees collected within Town limits shall be in accordance with the following formula: Impact Fee= (NNDU) x (P/HH) x (COST) x (TDR) Where: NNDU = The number of net new dwelling units generated by the proposed development. P/HH = Average person per household estimate published by the US Census Bureau for various dwelling unit categories (see Appendix C in the Development Impact Fee Study Update Report for Lexington dated April 15, 2024). COST= The cost per capita for providing improvements to parks and recreation facilities based on information presented in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, and adopted by Town Council on DATE. The cost per capita is $529.17. TDR = For the purpose of this calculation, it is Town Council policy to charge 100 percent of the maximum allowable parks and recreation impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026. Section 9.3 Determining Park and Recreation Impact Fees The amount of parks and recreation impact fees attributable to a specific development shall be determined through the following process: (a) verify the type and number of new residential dwelling units for which the building permit is being sought; (b) determine whether any of the proposed residential dwelling units qualify for a discount on parks and recreation impact fees as "affordable housing" and, if so, the number and type of such units; (c) determine the applicable residential dwelling unit category set forth in Exhibit A (as applicable) of this ordinance; and (d) multiply the discounted development impact fee rate for the residential dwelling unit category by the number of net new units within the development and the average persons per household estimate. Section 9.4 Independent Parks and Recreation Impact Fee Calculation In the event that a fee payor or Town staff contend that the land use for which the building permit is being sought is not within those land uses identified in Exhibit A, or if the fee payor contends that the Exhibit A calculations are not accurate for its intended use, then the Town Administrator, or its designee, shall make a determination as to the most comparable land use category to assume for calculating parks and recreation impact fees. If the fee payor disagrees with the determination of the Town Administrator, or its designee, or if the Town otherwise deems it appropriate, an independent impact fee calculation may be performed to quantify the fair share of system improvement costs attributable to the development. Preparation of an independent impact fee calculation will immediately halt the building permit application process until such time that the necessary calculation is deemed complete by the Town Administrator, or its designee. If an independent calculation is requested, it must accompany the building permit application and be prepared in accordance with the following provisions: (a) Independent calculations for the determination of parks and recreation impact fees must be performed by a certified professional engineer, architect, landscape architect, planner or other duly qualified and licensed professional approved by the Town Administrator, or its designee. (b) The independent calculation shall be subject to review and approval by the Town Administrator,or its designee. (c) The Town Administrator, or its designee, shall either approve or provide in writing the reasons for disapproval of the independent calculation study within thirty (30) days of its submittal for review. (d) Prior to commencing the study, the developer's hired professional and the Town Administrator, or its designee, shall agree upon the relevant factors and values that will be utilized in the independent calculation of impact fees. (e) The maximum allowable parks and recreation impact fee determined in the Development Impact Fee Update Study Report for Lexington shall be reduced by zero percent for the purposes of completing an independent impact fee calculation, setting the fees at 100 percent of the maximum amount. (f) The independent impact fee calculation shall be based on the following formula: Impact Fee= (NNDU) X (P/HH) X (COST} X (TOR) Where: NNDU = The number of net new dwelling units generated by the proposed development. P/HH = Average person per household estimate approved by the Town Administrator. COST = The cost per capita for providing improvements to parks and recreation facilities based on information presented in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, adopted by Town Council on DATE. The cost per capita is $529.17. TOR = For the purpose of this calculation, it is Town Council policy to charge 100 percent of the maximum allowable parks and recreation impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026. Section 9.5 Municipal Facilities and Equipment Impact Fee Formula Municipal facilities and equipment impact fees collected within Town limits shall be in accordance with one of the following formulas: (a) Residential Development Impact Fee= (NNDU) x (PIHH) x (COST) x (TOR) Where: NNDU = The number of net new dwelling units generated by the proposed development. PIHH = Average person per household estimate published by the US Census Bureau for various dwelling unit categories (see Appendix C in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026), COST= The cost per capita for providing municipal facilities and equipment based on information presented in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, adopted by Town Council on DATE. The cost per capita is $145.79. TOR= For the purpose of this calculation, it is Town Council policy to charge 100 percent of the maximum allowable municipal facilities and services impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026. (b) Non-Residential Development Impact Fee= ((NNSF)l1000) x (ESR) x (COST) x (TOR) Where: NNSF = The amount of net new square footage generated by the proposed development. ESR = Average employee space ratio developed using information published in the Institute of Transportation Engineers Trip Generation, Tenth Edition (see Appendix C in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026). COST= The cost per employee for providing municipal facilities and equipment based on information presented in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, adopted by Town Council on DATE. The cost per employee is $145.79. TOR= For the purpose of this calculation, it is Town Council policy to charge 100 percent of the maximum allowable municipal facilities and equipment impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026. Section 9.6 Determining Municipal Facilities and Equipment Impact Fees The amount of municipal facilities and equipment impact fees attributable to a specific development shall be determined through the following process: (a) verify the type and number of new residential dwelling units or the type and intensity of new non-residential square footage or other land use measuring criteria for which the building permit is being sought; (b) for residential development, determine whether any of the proposed residential dwelling units qualify for a discount on municipal facilities and equipment impact fees as "affordable housing" and, if so, the number and type of such units; (c) determine the applicable land use type and impact fee per unit set forth in Exhibit A (as applicable) of this ordinance; and (d) multiply the discounted development impact fee rate for the specified land use category by the number of net new units or net new square footage within the development (as applicable) and the average persons per household or employee space ratio estimate (as applicable). Section 9.7 Independent Municipal Facilities and Equipment Impact Fee Calculation In the event that a fee payor or Town staff contend that the land use for which the building permit is being sought is not within those land uses identified in Exhibit A, or if the fee payor contends that the Exhibit A calculations are not accurate for its intended use, then the Town Administrator, or its designee, shall make a determination as to the most comparable land use category to assume for calculating municipal facilities and equipment impact fees. If the fee payor disagrees with the determination of the Town Administrator, or its designee, or if the Town otherwise deems it appropriate, an independent impact fee calculation may be performed to quantify the fair share of system improvement costs attributable to the development. Preparation of an independent impact fee calculation will immediately halt the building permit application process until such time that the necessary calculation is deemed complete by the Town Administrator, or its designee. If an independent calculation is requested, it must accompany the building permit application and be prepared in accordance with the following provisions: (a) Independent calculations for the determination of municipal facilities and equipment impact fees must be performed by a certified professional engineer, architect, landscape architect, planner or other duly qualified and licensed professional approved by the Town Administrator, or its designee. (b) The independent calculation shall be subject to review and approval by the Town Administrator, or its designee. (c) The Town Administrator, or its designee, shall either approve or provide in writing the reasons for disapproval of the independent calculation study within thirty (30) days of its submittal for review. (d) Prior to commencing the study, the developer's hired professional and the Town Administrator, or its designee, shall agree upon the relevant factors and values that will be utilized in the independent calculation of impact fees. (e) The maximum allowable municipal facilities and equipment impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, shall be reduced by zero percent for the purposes of completing an independent impact fee calculation, setting the fees at 100 percent of the maximum amount. (f) The independent impact fee calculation shall be based on one of the following formulas: (1) Residential Development Impact Fee= (NNDU) x (P/HH) x (COST) x (TDR) Where: NNDU = The number of net new dwelling units generated by the proposed development. P/HH = Average person per household estimate approved by the Town Administrator, or its designee. COST= The cost per capita for providing municipal facilities and equipment based on information presented in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, adopted by Town Council on DATE. The cost per capita is $145.79. TOR= For the purpose of this calculation, it is Town Council policy to charge 100 percent of the maximum allowable municipal facilities and equipment impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026. (2) Non-Residential Development Impact Fee= ((NNSF)/1000) x (ESR) x (COST) x (TOR) Where: NNSF = The amount of net new square footage generated by the proposed development. ESR = Average employee space ratio approved by the Town Administrator, or its designee. COST= The cost per employee for providing municipal facilities and equipment is based on information presented in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026, adopted by Town Council on DATE. The cost per employee is $145.79. TOR= For the purpose of this calculation, it is Town Council policy to charge 100 percent of the maximum allowable municipal facilities and equipment impact fee determined in the Development Impact Fee Study Update Report for Lexington dated April 14, 2026. Section 9.8 Transportation Impact Fee Formula Transportation impact fees collected within Town limits shall be in accordance with one of the following formulas: (a) Residential Development Impact Fee= (NNDU) X (TRIPS) X (COST) X (TOR) Where: NNDU = The number of net new dwelling units generated by the proposed development. TRIPS= The number of new average daily trips generated by the proposed development taking into account the rate of pass-by capture published in the most current edition of the Trip Generation Handbook published by the Institute of Transportation Engineers. COST = The cost per trip for providing transportation improvements based on information presented in the Development Impact Fee Study Update Report

Text truncated. Open the original for the full document.

Source: Town of Lexington website. First collected Oct 13, 2026.