_03232026-877
Town of Lexington · Lexington County · meeting of Mar 23, 2026 · Minutes
Open the original document More from Town of Lexington
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MINUTES
Town of Lexington
Special Called Budget Workshop Meeting (Enterprise Fund)
111 Maiden Lane, Lexington, SC 29072
Council Chambers
March 23, 2026
The Town Council convened a Budget Workshop on March 23, 2026, at approximately
6:23 pm, immediately following the Special Called Work Session, to informally discuss
matters related to the proposed Enterprise Fund. The meetings were attended by: Mayor
Hazel Livingston, Mayor Pro-Tem Todd Carnes, Councilmembers Ron Williams, Todd
Lyle, Gavin Smith, Will Allen, and Jeannie Michaels.
Staff members present were Town Administrator Rachelle Gleaton , Assistant Town
Administrator Kevin Richardson, Finance Director Kathy Pharr, Financial Reporting
Manager Chad Melvin , Utilities Director David Wimna, Public Information Officer
Laurin Barnes, Town Attorney David Epperson, Digital Media Coordinator Michael
Tolbert, and Municipal Clerk Laura Hinson.
There were two (2) citizens present and no news media.
BUDGET WORKSHOP OPENING STATEMENT
CALL TO ORDER: Mayor Livingston welcomed everyone to the meeting and
introduced the Council Members. Mayor Livingston officially called the meeting to order
at 6:23 p.m.
BUSINESS ITEMS– Proposed Fiscal Year 2027 Budget (Enterprise Fund):
Ms. Pharr provided an overview of the Enterprise Fund, noting continued long- term
growth driven primarily by utility revenues. Water and sewer revenues remain the
dominant revenue sources, together accounting for approximately 90% of total revenues
in FY 2027, with sewer service identified as the primary driver of growth.
She reported that FY 2027 revenues remain stable, supported by recurring utility charges,
with additional income from capital contributions, tap fees, and miscellaneous sources,
and a conservative budgeting assumption of $750,000 in interest income.
On the expenditure side, increases are primarily due to salaries and benefits, contractual
services, and operating costs, in addition to a $15.2 million Capital Improvement Plan
reflecting significant infrastructure investment. She noted the debt service coverage
remains strong at 2.26 million , exceeding required thresholds even under more
conservative calculations.
Ms. Pharr noted modest staffing growth in response to an expanding customer base and
operational needs. Despite rising operating costs, the Enterprise Fund remains in a solid
financial position. She emphasized the need for a rate study, which has been included in
MINUTES
Special Called Budget Workshop (Enterprise Fund)
March 23, 2026
2
the upcoming budget. No rate increase is planned for the current year; instead, the study
will support long- term financial planning, ensure continued strong coverage ratios, and
provide a multi-year rate strategy and financial roadmap. This approach is consistent with
the prior practice of conducting rate studies approximately every six years. Ms. Pharr’s
full presentation is attached for reference.
Mr. Wiman identified two primary focus areas in the proposed budget: hiring and retention
of staff and a continued commitment to capital investment, noting alignment with prior
discussion. He highlighted that the budget addresses key operational needs, including
hydraulic model updates, Middle Stream Station upgrades, Shore Road Station, force main
improvements, and increased pump repair and replacement needs.
Mr. Wiman reviewed the department’s hiring and retention initiatives, noting that Phase I
(FY25) has been fully implemented, including position reorganization, promotional
pathways, sign- on and referral bonuses, and cultural expectations. Phase II (FY26) i s
largely complete, with remaining efforts focused on filling critical positions and
developing internal talent. Phase III is currently underway and includes adjustments to
pay grades for certified positions and expansion of the internship program.
Mr. Wiman reported significant improvement in staffing levels, noting a reduction in field
vacancies from 65% in FY23 to 22% currently, with 41 of 51 positions filled. However,
he emphasized ongoing turnover challenges, citing that only approximately 26% of
employees hired over the past ten years remain with the Town.
He noted that a majority of recent departures were due to better pay opportunities or
reduced overtime demands, and emphasized the impact of industry demands on retention.
He further explained that turnover creates ongoing impacts on staffing stability, tr aining,
and administrative workload.
Mr. Wiman noted that over the past five to six fiscal years, water customers have increased
approximately 10% and sewer customers approximately 22%, while staffing has increased
approximately 4%, resulting in an overall 18% growth in the customer base. He explained
that this growth has increased workload and system demands. He reported a reduction in
overtime costs, attributing the improvement to increased training, preventive
maintenance, enhanced instrumentation, data -driven decision- making, and ongoing
culture changes within the department. He noted that overall operational trends were
moving in a positive direction.
Mr. Wiman concluded by noting that hiring trends remain active, with approximately 15–
16 hires annually in recent years, and that turnover pressures are expected to continue.
Mr. Wiman’s presentation slide deck is attached for reference.
Councilmember Carnes requested clarification regarding a graph presented by Mr.
Wiman, specifically the axis values and what the overtime categories represented.
MINUTES
Special Called Budget Workshop (Enterprise Fund)
March 23, 2026
3
Mr. Wiman clarified that the chart reflects three categories of overtime required under
federal labor reporting standards: straight-time overtime, double time for weekend work,
and double time for holiday work, with the primary scale reflecting the larger straight-
time overtime expenditures and smaller values for double-time categories.
Council discussion followed regarding the relative scale of overtime costs in comparison
to overall salary expenditures. Mr. Wiman noted that overtime remains a necessary
operational expense due to emergency response needs and after-hours work requirements,
but overall levels remain controlled and efficient.
Mr. Wiman continued that nine employees have received promotions since the
implementation of the current organizational structure. He emphasized that these
advancements reflect strong buy- in from both field staff and supervisory personnel.
Supervisors have supported employee development through mentoring, training
opportunities, annual performance discussions, and leadership developme nt efforts. He
also noted examples of staff being given interim supervisory responsibilities to provide
hands-on experience and better prepare them for future advancement.
He concluded by noting that the proposed budget includes the addition of a trainee position
to support workforce development. He stated that the total proposed personnel -related
adjustments amount to approximately $246,000, representing less than 1% of the overall
budget, and are intended to strengthen recruitment, retention, and long- term workforce
stability.
Ms. Pharr stated that an additional position within the Finance Department is needed due
to increasing customer volume, growth in the fund, and expanded compliance and
reporting requirements. The new position would help manage the growing reporting
workload, allowing existing customer service staff to remain focused on assisting
customers while a dedicated employee handles enhanced reporting and financial analysis
responsibilities.
Mayor Pro-Tem Carnes asked about approximately $1 million in unspent salary funds
resulting from vacant positions during the current fiscal year.
Ms. Pharr explained that this is due to unfilled vacancies and that those unspent funds are
being directed to the fund balance and are planned to support approximately $11 million
in fund balance use for capital and one-time expenditures.
Mayor Pro -Tem Carnes asked whether those funds were designated for new capital
projects or deferred maintenance and infrastructure needs, including pump stations. Staff
responded that the funding supports both capital equipment and larger planned capital
projects, with emphasis on prioritized pump replacements and other critical infrastructure
identified through the capital planning process.
MINUTES
Special Called Budget Workshop (Enterprise Fund)
March 23, 2026
4
Ms. Gleaton clarified that the capital funding includes both prioritized pump purchases
outlined in the budget packet and larger capital projects in planning over recent years,
together comprising the $11 million in planned expenditures.
Councilmember Smith referenced operating expense and revenue trends, noting on the
operating overview that expenses are increasing approximately 8.8–9% while revenues
are growing at about 2.83%, and asked whether this creates a long- term sustainability
concern.
Ms. Pharr responded that this trend highlights the need for a rate study to evaluate current
rates in relation to rising costs and determine appropriate adjustments. She noted the rate
study is included in the FY27 budget.
Councilmember Smith also referenced the debt service coverage ratio declining from 3.58
to 2.26, while acknowledging it remains above the 1.2 requirement.
Ms. Pharr responded that there is no short -term concern with the ratio but reiterated the
importance of the rate study to ensure long- term financial stability and to support future
capital and operating needs, which may show a needed rate increase.
Councilmember Smith commended Mr. Wiman for his responsiveness and leadership in
the Utilities Department and referenced a prior sanitary sewer overflow reported in the
State newspaper. He asked what corrective measures have been implemented and whether
the hydraulic model is included in the budget.
Mr. Wiman confirmed the budget includes funding for a hydraulic model and a Mill
Stream Station upgrade, which he noted is a critical facility handling approximately 90–
95% of total sewer flow. He explained the upgrade will improve system reliability,
maintenance access, and operational flexibility.
He further stated that the department is conducting system -wide evaluations, including
sonar inspections, CCTV line assessments, and infiltration/inflow studies to identify
deficiencies. He explained that when combined with the hydraulic model, these tools will
provide a comprehensive planning framework for prioritizing capital improvements and
reducing system risk. He confirmed corrective actions have already been implemented
following the prior overflow event.
Mayor Livingston stated she has recently spent significant time with the Utilities
Department due to fiber coordination and water main break responses, which have given
her additional insight into field operations. She emphasized the importance of investing
in staff and noted that recruitment, training, and retention challenges directly impact
service delivery and institutional knowledge. She stated that retaining experienced
employees is essential for maintaining high-quality municipal services.
Councilmember Michaels asked whether ongoing hiring needs are unique to the Town or
reflective of broader industry conditions.
MINUTES
Special Called Budget Workshop (Enterprise Fund)
March 23, 2026
5
Mr. Wiman stated the issue is industry- wide, noting that a large portion of the utility
workforce has retired in recent years, increasing turnover. He added that utilities are
competing with other public and private employers for a limited pool of skilled workers.
Councilmember Michaels asked whether the proposed capital investment plan is sufficient
long-term or more of a short-term “Band-Aid” approach.
Mr. Wiman stated that the capital budget was developed through internal review and
prioritization, balancing infrastructure needs with financial constraints while addressing
critical system requirements. He added that increased chemical costs are due to a planned
change from lime feed to magnesium hydroxide to reduce corrosion and improve long-
term system protection.
Councilmember Williams asked about year-end financial projections. Ms. Pharr explained
that revenues are projected to come in higher than budgeted while expenditures are
slightly lower, resulting in reduced use of fund balance. She noted that lower expenditures
are largely due to salary savings from vacant positions, as the budget assumes full staffing
throughout the fiscal year.
Councilmember Williams also referenced shifts in operating expense categories
(Administration, Finance, IT, and Building Maintenance) and asked for clarification. Ms.
Pharr explained that these changes are the result of the FY25 organizational restructuring,
with FY26 being the first full year under the new structure, which redistributed costs
across departments.
Councilmember Williams asked about the lifespan and repairability of pump stations.
Mr. Wiman explained that pump stations have a limited service life and can only be rebuilt
a certain number of times before components become inefficient or fail. He noted the
Town operates approximately 136 pump stations and is continuing system asset cataloging
due to incomplete historical records. He added that an asset coordinator/planner position
was added to improve tracking, warranty management, and lifecycle planning.
Mayor Pro-Tem Carnes referenced Finance operating expenses on page 3 of the budget
document, noting an increase from approximately $1.53 million in FY25 to $2.33 million
in FY27, and asked for an explanation of the roughly 50% increase.
Ms. Pharr explained the increase is primarily driven by personnel changes, including two
meter reader positions transferred from Utilities, as well as additional vehicle costs and
redistribution of workload between departments to improve efficiency.
Mayor Pro -Tem Carnes noted that Utilities expenses on page 3 reflect approximately
$12.5 million increasing to $17.7 million and stated that FY25 staffing was not filled, but
the budget assumes full staffing. He noted that this results in budgeted expenses that may
MINUTES
Special Called Budget Workshop (Enterprise Fund)
March 23, 2026
6
not reflect actual spending due to vacancies. M s. Pharr confirmed that budgeted figures
assume full staffing for comparison purposes.
Mayor Pro -Tem Carnes also noted approximately $3 million in anticipated unspent
personnel costs in FY26 due to vacancies. Pro-Tem Carnes continued and referenced
sewer treatment costs on page 12 and noted differences between departmental and
summary totals. Ms. Pharr explained that page 12 reflects departmental detail, while page
11 shows total sewer treatment costs, and that increases are driven by higher charges from
the City of Cayce, with sewer treatment budgeted at approximately $5.3 million in FY26
compared to prior year levels.
Mayor Pro-Tem Carnes asked about long-term planning for sewer treatment expansion in
Cayce. Ms. Gleaton stated that staff will be meeting with the City of Cayce to refine cost
projections. She explained that a Professional Engineering Report (PER) will first be
developed to define the scope, cost, and design alternatives for expansion. Mr. Richardson
added that the PER will provide design recommendations and be brought back to Council,
along with coordination with partner agencies, as planning progresses.
Councilman Lyle referenced contractual services on page 20, specifically a $71,250 line
item for Adams & Reese lobbying services, and whether there is a benefit to this service.
Ms. Gleaton affirmed that the firm is beneficial as it assists the Town in identifying and
securing state and federal funding opportunities, including grants for major infrastructure
projects such as the wastewater treatment plant expansion.
Councilman Lyle also asked about right -of-way clearing costs under account 380. Mr.
Wiman explained that these costs are required for regulatory compliance, system access,
and storm response and are distributed across utility departments.
Discussion was also held regarding asset management software (Ziptility), with staff
explaining that it supports work order tracking, maintenance planning, and infrastructure
lifecycle management.
Councilmember Allen referenced page 32 of the capital improvement plan and asked
about approximately $59 million in projected future capital spending, if he could
elaborate.
Mr. Wiman explained that major components include parallel force mains, sewer and
water system upgrades, and booster station improvements. He noted several projects are
dependent on completion of the hydraulic model, which will refine prioritization and
sequencing of capital needs.
Ms. Pharr added that funding sources for these projects may include fund balance, future
rate adjustments, debt issuance, and potential grant funding.
MINUTES
Special Called Budget Workshop (Enterprise Fund)
March 23, 2026
7
Councilmember Allen asked specifically about bonding, and Ms. Pharr confirmed that
bonding will likely be part of the long- term financing strategy, along with phased
implementation of projects.
Councilmember Smith asked Mr. Wiman whether the proposed budget adequately
supports recruitment and retention needs.
Mr. Wiman responded that the budget is sufficient to remain competitive but
acknowledged ongoing challenges in attracting and retaining employees. He referenced a
recent employee who left for a $5 per hour increase . He stated the Town currently lacks
the flexibility to counter offers due to structured pay grades and noted compression issues
where new hires can earn more than supervisory staff. He explained that there is no formal
mechanism for individualized counteroffers, and while merit increases exist, pay structure
limitations reduce flexibility.
Ms. Gleaton added that current policy allows limited adjustments for certifications but
noted the pay structure is not designed for individualized compensation adjustments,
which can create operational inefficiencies. She stated that all employees typicall y enter
at entry-level rates regardless of prior experience or certification.
Councilmember Smith stated that the Administrator should have some flexibility to make
retention decisions in critical cases while maintaining the overall policy structure.
Councilmember Smith also asked about debt service coverage ratios and whether CCF
fees were included.
Ms. Pharr explained that CCF fees apply to large developments such as commercial
projects, while tap fees apply to individual residential connections. She noted CCF
revenue is variable and not guaranteed, which is why financial coverage is evaluated both
with and without CCF revenue to ensure stability.
Councilmember Michaels asked about non- cash capital contributions and reserve
coverage. Ms. Pharr explained that non-cash contributions, such as donated infrastructure,
are not included in the budget because the budget reflects only cash -based activity. She
added that reserves provide capacity to replace infrastructure if such contributions are not
received.
With no further questions from Council or staff, Mayor Livingston thanked everyone for
their work on the budget process and noted the item would proceed through the budget
cycle.
PUBLIC COMMENTS: None
NEWS MEDIA QUESTIONS: None
STAFF: None
MINUTES
Special Called Budget Workshop (Enterprise Fund)
March 23, 2026
8
CLOSING STATEMENT & ADJOURNMENT : Mayor Livingston adjourned the
meeting at 8:06 pm
Respectfully submitted,
___________________________
Laura Hinson
Municipal Clerk
APPROVED:
_________________________
Hazel Livingston
Mayor
FOIA COMPLIANCE – Public notification of this meeting was published, posted , and mailed in compliance with the
Freedom of Information Act and the Town of Lexington requirements.
Source: Town of Lexington website. First collected Oct 13, 2026.