Public Works Committee February 2026 agenda
City of Mauldin · Greenville County · meeting of Jan 30, 2026 · Agendas
Open the original document More from City of Mauldin
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PUBLIC WORKS
COMMITTEE MEETING
MONDAY, FEBRUARY 2, 2026 | 6 PM
2nd Committee Meeting
The Committee will meet in Mauldin City Hall at 5 East
Butler Road in the Council Chambers at 6 p.m.
The meeting will be available remotely through Zoom. Please visit the City’s website at
https://cityofmauldin.org/your-government/meeting-minutes-agendas/ to access the
meeting via audio and videoconferencing.
A quorum of Council will be present.
1
PUBLIC WORKS COMMITTEE MEETING
FEBRUARY 2 , 2026, 6PM
CITY HALL - COUNCIL CHAMBERS
5 E. BUTLER ROAD
Committee Members: Jason Kraeling (Chair), Carol King, Michael Reynolds
1. Call to Order
2. Public Commen t
3. Reading and Approval of Minutes
a. Public Works Committee: January 5, 2026 [Pages 3-5]
4. Reports or Communications from City Officers
a. PW Director Matthew Fleahman
5. Unfinished Business
There is no unfinished business.
6. New Business
a. City Hall Generator Replacement [Pages 6-13]
b. MOA- Woodruff Road Congestion Relief Project [Pages
14-20]
c. Discussion: Inter-parcel Access Request Summer Moon
[Pages 21-24]
7. Public Comment
8. Committee Concerns
9. Adjournment
Chairperson Jason Kraeling
Chairperson Jason Kraeling
Chairperson Jason Kraeling
Chairperson Jason Kraeling
C
hairperson Jason K raeling
Chairperson Jason Kraeling
Chairperson Jason Kraeling
Chairperson Jason Kraeling
Chairperson Jason Kraeling
2
MINUTES
PUBLIC WORKS COMMITTEE MEETING JANUARY 5, 2026, 6PM
CITY HALL - COUNCIL CHAMBERS 5 E. BUTLER ROAD
1st committee meeting
Committee Members present: Jason Kraeling (Chair), Carol King, Michael Reynolds
Others present: PW Director Matthew Fleahman, City Administrator Seth Duncan and Assistant
City Administrator Greg Saxton
1. Call to Order- Chairman Kraeling
2. Public Comment- None
3. Reading and Approval of Minutes
a. Public Works Committee: October 6, 2025
Motion: Councilwoman King made a motion to approve the minutes as distributed.
Councilman Reynolds seconded the motion.
Vote: The vote was unanimous (3-0).
4. Reports or Communications from City Officers
a. PW Director Matthew Fleahman- No report this month.
5. Unfinished Business- There is no unfinished business.
6. New Business
a. Resolution- Sale of Equipment
With the purchase of new trucks and equipment over the past three years, Police, Fire, and
Public Works now has several old, outdated, and/or damaged equipment which is stored at
the Public Works Facility. Disposal of the equipment can be managed easily with the use of
the Gov Deals website. All revenue from the sale of the equipment will be added to the
General Fund and any item that fails to sell at auction will be sold for scrap value.
Motion: Councilwoman King made a motion to forward this resolution to Council with a
recommendation of approval with Councilman Reynolds seconding.
Vote: The vote was unanimous (3-0).
3
b. Sid ewalk Repairs - Hyde Circle
A
s part of the 2025 – 2026 Fiscal Year Budget for the City of Mauldin, Council approved
$255,500 for sidewalk and trail projects. On November 10, 2025, the Public Works
Department released a Request for Proposal for the replacement of approximately 1,240
linear feet of sidewalk along Hyde Circle. The proposals were due on December 8, 2025
and the City received only one submittal. The submittal was reviewed by staff and
determined to be complete and responsible and was also below the preliminary estimate
as determined by staff.
R&G Construction LLC listed its bid for services at $105,435. The remaining funds will be
utilized for future trail development at City Center and to evaluate new sidewalks along
City owned roadways.
Motion: Councilman Reynolds made a motion to forward this item to Council with a
recommendation of approval of the bid to R&G Construction for $105,435. Councilwoman
King seconded the motion.
Vote: The vote was unanimous (3-0).
c. 2026
Road Repaving Project
A
s part of the 2019 IMS review of the City’s roadways, a five-year paving recommendation
was generated to address roadway issues at the time and to provide a schedule to keep
up with the useful life of the City’s existing roadways. IMS completed the roadway
analysis and generated new Pavement Condition Index (PCI) for the City’s roadways. The
PCI is a 0-100 numerical rating system used in pavement management to assess a road's
overall health by visually identifying and scoring pavement distresses like cracks,
potholes, and rutting, helping authorities prioritize maintenance, repairs, and
reconstruction to optimize infrastructure performance.
A review of the IMS road scores indicates that currently the City has over 8 miles of
roadway with a PCI less than 50. A PCI score less than 50 indicates that the roadway is
deemed poor/very poor. The $2 million dollars previously budgeted for the Holland Road
resurfacing project could address nearly all of the roadways currently scored with a PCI
less than 50. Therefore, staff is recommending that Council allocate Capital
Transportation Funds to repair the worst roads first instead of a single road.
4
M otion: Councilwoman King made a motion to forward this item to Council with a
recommendation of approval. Councilman Reynolds seconded the motion.
Vo
te: The vote was unanimous (3-0).
7. P
ublic Comment- None
8. C
ommittee Concerns- None
9. A
djournment- Chairman Kraeling adjourned the meeting at 6:47 p.m.
R
espectfully Submitted,
Cindy Miller
Municipal Clerk
5
PUBLIC WORKS COMMITTEE
AGENDA ITEM
M
EETING DATE: February 2, 2026
AG
ENDA ITEM: 6a
T
O: Public Works Committee
F
ROM: Public Works Director, Matthew Fleahman
S
UBJECT: City Hall Generator Replacement
REQUEST
The Public Works Department is requesting approval from Committee and Council to award the
contract for the generator upgrades at City Hall to Generator Services, Inc.
HISTORY/BACKGROUND
During the August 2025 City Council meeting, Council approved funding for City Hall
improvements as part of the City of Mauldin’s 2024- 2025 Fiscal Year surplus projection and
recommended expenditure plan. The funds were generated from revenues coming in over
projections on primary items (property taxes, permits, and business license). As part of staff ’s
recommendation for the funds, it was identified that a full facility generator was needed for the
building as well as other interior improvements . Council ultimately authorized $250,000 for the
upgrades and authorized a budget in October.
ANALYSIS or STAFF FINDINGS
On November 3, 2025, the Public Works Department released a Request for Quotation (RFQ) for
the replacement of the existing generator with a new unit capable of powering the entire facility.
The RFQ was posted on the City’s website as well as South Carolina Business Opportunities
Online Edition in accordance with the City’s Purchasing policy. The proposals were due on
December 3, 2025, and the City received five (5) submittals. The submittals were reviewed by
staff and determined to be complete and responsible. The lowest responsible bid was in the amount
of $245,332.46 by Generator Services, Inc. A summary of the bids is presented below:
Name of Company
Amount
Bid Alternate Bid
Generator Services $245,332.46 $284,792.81
Page Power $298,470.00 $305,470.00
Reedy Power $307,000.00
JDI $305,173.00
Excel Electric $314,052.00
6
FINANCIAL IMPACT
As part of the City of Mauldin’s 2024- 2025 Fiscal Year surplus projection and recommended
expenditure plan, Council approved $250,000 for various City Hall improvements . These
improvements include the following:
Project Budget Actual Cost Quote Balance
Full Facility Generator $185,000.00 $245,332.46
Interior Painting $5,000.00 $4,925.00
Electronic Door Locks $16,000.00 $16,306.71
ADA accessible entry way $8,000.00 $3,208.40
Council Chamber Carpet $15,000.00 $0.00
Contingency $21,000.00 $0.00
TOTAL $250,000.00 $24,440.11 $269,772.57 ($19,772.57)
To date, $24,440.11 has been spent on interior painting, electronic door locks, and the ADA
compliant door at the rear of the facility. If staff reallocates all remaining funds to support the
purchase and installation of the generator, the balance remaining would be negative $19,772.57.
To cover the balance, staff is proposing utilizing savings/balance of budgeted Capital Budget
Funds in the amount of $32,000 that were achieved due to expenses coming in less than budgeted.
Capital Budget Items Budget Cost Balance
Trucks $100,000.00 $88,762.00 $11,238.00
MCC Building $30,000.00 $23,794.90 $6,205.10
Scissor Lift $9,000.00 $7,875.00 $1,125.00
Asphalt Drag Box $18,000.00 $13,135.00 $4,865.00
Concrete Curb Machine $20,000.00 $13,189.70 $6,810.30
Zero Turn Mower $20,000.00 $17,673.37 $2,326.63
TOTAL $197,000.00 $164,429.97 $32,570.03
With the allocation of the balance of unexpended funds ($32,570.03) from the Public Works
Department capital purchases , sufficient fu nds are present to cover this expenditure and any
contingency needed for unanticipated electrical expenses and taxes.
RECOMMENDATION
Staff recommends that the Public Works Committee and City Council award the contract for
generator upgrades at City Hall to Generator Services, Inc. funded in the amount of $245,332.46
and allocate a contingency of $32,000 from the Capital Fund for the generator , unexpected
electrical expenses and taxes.
7
8
9
10
11
12
13
PUBLIC WORKS COMMITTEE
AGENDA ITEM
M
EETING DATE: February 2, 2026
AG
ENDA ITEM: 6b
TO
: Public Works Committee
FROM: Public Works Director, Matthew Fleahman
SUBJECT: MOA – Woodruff Road Congestion Relief Project
REQUEST
The Public Works Department is requesting the Committee and Council authorize the memorandum of
agreement (MOA) between the City of Mauldin, the City of Greenville, and Greenville County for the
Woodruff Road Congestion of Relief project.
HISTORY/BACKGROUND
The Greenville- Pickens Area Transportation Study (GPATS) has prioritized the Woodruff Road
Congestion Relief Project (WRCRP) in its Long -Range Transportation Plan (LRTP) and has progressed
through Transportation Improvement Program (TIP) inclusion, Preliminary Engineering National
Environmental Policy Act (NEPA) design, and is currently in Right -of-Way acquisition. Funding for the
WRCRP has been secured by GPATS, the South Carolina Transportation Infrastructure Bank (SCTIB), and
Greenville County in the amount of $127.4 million. The WRCRP includes a new, alternate parallel route
to Woodruff Road that will pass through the City of Greenville, the City of Mauldin, and Greenville County.
ANALYSIS or STAFF FINDINGS
The MOA stipulates that after construction is complete, SCDOT will turn over ownership of the new
parallel roadway and its rights -of-way to the Cities with comprehensive roadway and landscaping
Maintenance Agreements, with the following ownership limits imposed:
• City of Greenville ownership of the parallel roadway from Verdae Boulevard to the Genesee -
Wyoming railroad crossing;
• City of Mauldin ownership of the parallel roadway from the Genesee- Wyoming railroad crossing
to Woodruff Road
14
The agreement (attached) is the current working draft and articulates to SCDOT which jurisdictions would
be responsible for each portion. SCDOT would still own all bridge crossings.
FINANCIAL IMPACT
There is no financial impact in authorizing the MOA; however, there will be costs associated with road
maintenance. These costs are expected to be absorbed by the Street Division in the Public Works
Department.
RECOMMENDATION
Staff recommends that the Public Works Committee and City Council authorize the MOA between the
City of Mauldin, the City of Greenville, and Greenville County for the Woodruff Road Congestion of
Relief project once the draft has been finalized by all parties.
City of Greenville
City of Mauldin
15
DRAFT - MEMORANDUM OF AGREEMENT - DRAFT
BETWEEN THE COUNTY OF GREENVILLE, SC,
THE CITY OF GREENVILLE, SC, AND
THE CITY OF MAULDIN, SC FOR THE
WOODRUFF ROAD CONGESTION RELIEF PROJECT
WHEREAS,
this document will serve as a Memorandum of Agreement
between the County of Greenville, SC (Greenville County or the County),
the City of Greenville, SC (City of Greenville), and the City of Mauldin, SC
(City of Mauldin)(collectively, the City of Greenville and City of Mauldin
are the Cities), for the purposes of agreeing to and understanding aspects
concerning the future “Woodruff Road Congestion Relief Project’s”
parallel road, and
WHEREAS,
the Greenville-Pickens Area Transportation Study (GPATS) has
prioritized the Woodruff Road Congestion Relief Project (WRCRP)in its
Long-Range Transportation Plan (LRTP)and has progressed through
Transportation Improvement Program (TIP) inclusion, Preliminary
Engineering National Environmental Policy Act (NEPA) design, and is
currently in Right-of-Way acquisition, and
WHEREAS,
funding for the WRCRP has been secured by GPATS, the South
Carolina Transportation Infrastructure Bank (SCTIB), and Greenville County
in the amount of $127.4 million, and
WHEREAS, the WRCRP includes a new, alternate parallel route to Woodruff
Road that will pass through the City of Greenville, the City of Mauldin, and
Greenville County (see Attachment 1), and
WHEREAS,
du e to the Woodruff Road corridor being of critical and
sensitive commercial, industrial, and residential importance and the land
uses affected by and affecting the WRCRP parallel road are currently
established development, potential redevelopment, and/or at risk of
adverse impacts due to the project, and
WHEREAS,
due to the NEPA Environmental Assessment’s “Purpose and
Need” stating the project must “improve operational efficiency and
alleviate traffic congestion on Woodruff Road to improve mobility,” and
WHEREAS,
the South Carolina Department of Transportation (SCDOT), in
constructing the project, requires an agreement between jurisdictions on
the ownership of any new roadway,
16
THEREFORE,
BE IT KNOWN, that the following provisions of this
Memorandum of Agreement are understood and acceptable to all
parties:
1) That the GPATS and SCDOT “Woodruff Road Congestion Relief Project,”
including the new parallel road, is an imminent project currently in
Right-of-Way planning and scheduled to be under construction
between Calendar Years 2027-2030, and that the impacts to the
greater SC “Upstate” region will be far-reaching and crucial to prepare
for in advance.
2) That SCDOT will administer the WRCRP with Federal funding and under
Federal regulations, and that the County and Cities will abide by,
adhere to, and accommodate the project time frames as they are
established and are changed/updated, and that properties affected
by access changes and Right-of-Way purchases by SCDOT will be
dealt with by SCDOT at the appropriate time as prescribed by Federal
regulations.
3) That the County and Cities will take necessary action to protect the
proposed project Right-of-Way by remaining informed and
participating in project updates as they are made available by
SCDOT, and shall distribute relevant information to their departments,
developers, businesses and residents as appropriate.
4) That the County and the Cities will be proactive in their land use
planning along Woodruff Road and the new parallel road corridor to
ensure appropriate development and redevelopment at the
appropriate times to avoid impediments to SCDOT acquisition of Right-
of-Way, and to prevent undue impacts to property owners, businesses,
and residents during Right-of-Way acquisition.
5) That after construction is complete, SCDOT will turn over ownership of
the new parallel roadway and its rights-of-way to the Cities with
comprehensive roadway and landscaping Maintenance Agreements,
with the following ownership limits imposed:
• City of Greenville ownership of the parallel roadway from
Verdae Boulevard to the Genesee-Wyoming railroad crossing;
• City of Mauldin ownership of the parallel roadway from the
Genesee-Wyoming railroad crossing to Woodruff Road
6) That the congestion currently existing on Woodruff Road should not be
allowed to be replicated on the new parallel road, and that the local
jurisdictions have a responsibility to identify and utilize the “best
17
pr
actices” of Access Management and Parcel Connectivity to
mitigate negative land use impacts on the future corridor
infrastructure, including but not limited to:
• Cross-parcel connectivity access;
• Prohibiting the creation of new curb cuts along the new parallel
corridor unless required by law;
• Preservation of the planted and concrete median.
7) T
hat the County and the Cities, understand that the Woodruff Road
corridor and new parallel road from Verdae Boulevard to Smith Hines
Road need a single vision and standardized implementation policy
that will be developed in order to establish proactive Area Planning
and Infrastructure Best Practices, regardless of jurisdictional boundaries.
8)
That pursuant to the above items, the County and the Cities will work
with GPATS and SCDOT on a single Woodruff Parallel Area Plan, at
minimum agreeing to:
• A Joint and Collaborative Planning Process for any land use
plans to be conducted that will affect Woodruff Road and the
new parallel;
• Establishing permanent and inviolate Access Management
Standards for the new parallel roadway;
• Maintaining a single set of roadway, bike/pedestrian, transit and
landscaping Design Standards for the new parallel roadway;
• A single Name for the parallel roadway, even in disparate
segments, from Verdae Boulevard to Woodruff Road.
9)
That this Memorandum of Agreement shall empower and entrust the
planning and engineering staffs of the County and Cities to convene
regularly, be proactive in reaching out to stakeholders as appropriate,
and work diligently with GPATS and SCDOT towards the completion of
a Woodruff Parallel Area Plan.
T
his Memorandum of Agreement entered into agreement upon this day,
the __ of ________, 2026.
CO
UNTY OF GREENVILLE
ATTEST:
By:
Benton Blount, Chairman
Greenville County Council
18
By:
Regina McCaskill
Clerk to Council
Date: _______________________
By:
Joseph M. Kernell
County Administrator
________________________________________________
Knox White, Mayor of the City of Greenville
________________________________________________
Shannon Lavrin, City Manager, Greenville
________________________________________________
Terry Merritt, Mayor of the City of Mauldin
________________________________________________
Seth Duncan, City Administrator, Mauldin
19
Attachment 1
20
PUBLIC WORKS COMMITTEE
AGENDA ITEM
M
EETING DATE: February 2, 2026
AG
ENDA ITEM: 6c
T
O: Public Works Committee
F
ROM: Seth Duncan, City Administrator; Public Works Director, Matthew Fleahman
S
UBJECT: Discussion: Inter-parcel Access Request Summer Moon
REQUEST
Staff is presenting a request from Summer Moon for inter-parcel access between their parking lot
and the City’s staff parking lot to increase accessibility between the two parcels for their customers.
HISTORY/BACKGROUND
As part of the redevelopment of the old BBT building adjacent to City Hall, the developers agreed
to the City’s request to close the old drive thru lane. The old drive thru was often used as a cut
through for traffic looking to avoid the traffic light at HWY 276 (Main Street) and E. Butler Road.
S
ummer Moon, the coffee shop that is now in a portion of the old BB&T building understands that
reopening the old drive thru is not likely, but is requesting Council consider opening a connection
between the two parking lots for inter-parcel access.
I
n the letter attached, the owner/operator shares the difficulty it often is for customers to leave the
shop and access E. Butler Road, and sometimes new customers are routed through the old drive
thru to the store. Summer Moon believes that opening a parking lot access will help increase access
to the store.
21
ANALYSIS or STAFF FINDINGS
Inter-parcel access has been a long time desire of urban planning and is a corner stone to reducing
curb-cuts, congestion, and accidents. Expanding inter -parcel access does provide drivers with
more alternatives for both entry and exit of a property. The City’s City Center Village Master Plan
highly promotes inter -parcel access as part of the walkable village concept. The installation of
inter-parcel access will likely result in the loss of 2 parking spaces for Summer Moon.
FINANCIAL IMPACT
None.
RECOMMENDATION
Staff recommends that the Public Works Committee and City Council consider allowing the
property owner to create a parking lot access between the two properties.
ATTACHMENT
• Summer Moon Request
22
23
24