Public Works Committee January 2026 agenda
City of Mauldin · Greenville County · meeting of Dec 31, 2025 · Agendas
Open the original document More from City of Mauldin
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PUBLIC WORKS
COMMITTEE MEETING
MONDAY, JANUARY 5, 2026 | 6 PM
1st Committee Meeting
The Committee will meet in Mauldin City Hall at 5 East
Butler Road in the Council Chambers at 6 p.m.
The meeting will be available remotely through Zoom. Please visit the City’s website at
https://cityofmauldin.org/your-government/meeting-minutes-agendas/ to access the
meeting via audio and videoconferencing.
A quorum of Council will be present.
1
PUBLIC WORKS COMMITTEE MEETING
JANUARY 5 , 2026, 6PM
CITY HALL - COUNCIL CHAMBERS
5 E. BUTLER ROAD
Committee Members: Jason Kraeling (Chair), Carol King, Michael Reynolds
1. Call to Order
2. Public Commen t
3. Reading and Approval of Minutes
a. Public Works Committee: October 6, 2025
[Pages 3-5]
4. Reports or Communications from City Officers
a. PW Director Matthew Fleahman
5. Unfinished Business
There is no unfinished business.
6. New Business
a. Resolution- Sale of Equipment [Pages 6-8]
b. Sidewalk Repairs- Hyde Circle [Pages 9-18]
c. 2026 Road Repaving Project [Pages 19-20]
7. Public Comment
8. Committee Concerns
9. Adjournment
Ch
airperson Jason Kraeling
Ch
airperson Jason Kraeling
Ch
airperson Jason Kraeling
Ch
airperson Jason Kraeling
Ch
airperson Jason Kraeling
Ch
airperson Jason Kraeling
Ch
airperson Jason Kraeling
Ch
airperson Jason Kraeling
Ch
airperson Jason Kraeling
2
MINUTES
PUBLIC WORKS COMMITTEE MEETING OCTOBER 6, 2025, 6PM
CITY HALL - COUNCIL CHAMBERS 5 E. BUTLER ROAD
1st committee meeting
Co
mmittee Members present: Jason Kraeling (Chair), Carol King, Michael Reynolds
Oth
ers present: Public Works Director Matthew Fleahman, City Administrator Seth Duncan and
Assistant City Administrator Greg Saxton
1. Ca
ll to Order- Chairman Kraeling
2. Pu
blic Comment- None
3. Re
ading and Approval of Minutes
a. Public Works Committee: September 2, 2025
M
otion: Councilman Reynolds made a motion to accept the minutes with Councilwoman
King seconding.
Vo
te: The vote was unanimous (3-0).
4. Re
ports or Communications from City Officers
a. PW Director Matthew Fleahman
M
r. Fleahman reported staff from the Streets Division put sod down on the area and
graded the area in front of the stage on the Cultural Center Grounds. Staff also installed a
drop grate drainage system on the back side of the stage which will capture all water
before it can get to the stage. A new concrete pad has been poured behind the stage and a
fence is being constructed.
5. Un
finished Business-There is no unfinished business.
6. New
Business
a. City Hall Renovations Budget
Duri
ng the August 2025 City Council meeting, Council approved funding for City Hall
improvements as part of the City of Mauldin’s 2024-2025 Fiscal Year surplus projection
and recommended expenditure plan. It was identified that a full facility generator was
needed for the building as well as other interior improvements. Council ultimately
authorized $250,000 for the upgrades.
Be
low is a summary of activities and equipment staff is recommending for the use of the
funds provided by Council.
3
Full
Facility Generator - $185,000
Th
e existing generator was installed when the facility was constructed and is currently
undersized for the facility. An estimate of $185,000 is projected. The new system will be
sized to power the entire building and any projected expansion of the facility.
In
terior Painting - $5,000
Th
e interior lobby of the City Hall complex hasn’t been painted since the facility was
constructed. Damage to the walls and paint are noted in both the PD section of the
downstairs lobby and the staircase by the Business and Development Office. Interior
painting is expected to cost approximately $5,000 and will include drywall repair, painting,
and trim repairs.
El
ectronic Door Locks - $16,000
Wh
ile City Hall closes at 5pm, the PD section of the facility remains open 24 hours a day.
To bolster facility security, electronic mag locks/door closers are recommended for the
two doors connecting the City Hall lobby with the PD section of the facility. Electronic
timers can ensure that the doors close at the appropriate time and can only be accessed
with the appropriate key card. The expected cost of the security upgrade is
approximately $16,000 and will connect to the existing system currently in place at the
facility. The proposed cost estimate has been generated from previous quotes and does
include replacing the existing wooden doors with glass.
ADA
accessible entry way - $8,000
Th
e PD section of City Hall remains open 24 hours a day; however, the door to the PD
section does not comply with the ADA requirements. A push button electronic door
opener is recommended for this entryway at an approximate cost of $8,000. If quotes for
the system come in less than anticipated, a similar system will be installed on the front
doors of the City Hall lobby.
Co
uncil Chamber Carpet - $15,000
Sta
ff recommends replacing all carpet in the Council Chamber with new. The existing
flooring has been in place since construction and needs updating. The estimated cost is
approximately $15,000.
Con
tingency – Balance to finish
Th
e total cost for the projects presented is identified as $229,000. Due to price variability
and the conservative nature of how these estimates were generated, a contingency line is
4
recommended. In the event that total costs come in less than the estimates, staff will
work to identify additional projects for the facility. These additional projects could include
replacing carpet in additional areas, 1st floor public bathroom improvements, or other
needed upgrades. If no additional projects can be identified with any remaining balance,
those funds will be returned to fund balance.
C
ouncilwoman King asked if laminate or another material could be looked at to replace
the carpet in the Courtroom/ Council Chambers. Mr. Fleahman said once there is an idea
of how much funding is left over from the other projections, it could be looked at.
M
otion: Councilman Reynolds made a motion to send this item to Council with a
recommendation of approval with Councilwoman King seconding.
Vote: The vote was unanimous (3-0).
7. P
ublic Comment- None
8. C
ommittee Concerns- None
9. A
djournment- Chairman Kraeling adjourned the meeting at 6:11p.m.
R
espectfully Submitted,
Cindy Miller
Municipal Clerk
5
PUBLIC WORKS COMMITTEE
AGENDA ITEM
M
EETING DATE: January 5, 2026
AG
ENDA ITEM: 6a
TO
: Public Works Committee
FROM: Public Works Director, Matthew Fleahman
SUBJECT: Disposal of Old/Damaged Capital and Equipment
REQUEST
Authorization is requested to move forward with the disposal of old/damaged equipment and vehicles
either by public auction or sold for scrap value.
HISTORY/BACKGROUND
With the purchase of new trucks and equipment over the past three years, Police, Fire, and Public Works
now has several old, outdated, and/or damaged equipment which is stored at the Public Works Facility .
The City has historically gotten rid of the old equipment at auctions. This process requires staff hours to
both set up and manage the process. This whole process can no w be managed easily with the use of the
Gov Deals website.
ANALYSIS or STAFF FINDINGS
The items proposed to be sold are attached on Table 1. Public Works does not use any of the items
currently, nor does the Department intend to use in the future. All revenue from the sale of the equipment
will be added to the General Fund for the City of Mauldin. Any item that fails to sell at auction will be
sold for scrap value.
TIMELINE
Should City Council approve the sale, the items can be listed on Gov Deals within 60 days.
RECOMMENDATION
Staff recommends the Public Works Committee and the City Council approve the sale of the old/damaged
equipment.
6
Table 1
Items to be Sold
Department Item Description Quantity Notes
Fire Ram Fans 6 Unknown
Fire Ram Fan (Parts Only) 1 For parts use only
Fire Pipe Poles (Various Sizes) 8 Mixed lengths
Fire Electric Portable Lights 3 Operational
Fire Winches 2 One with cable, one without
Fire Acetylene Torch Set 1 Complete set
Fire Generator 1 Unknown
Fire Electric Saw-All 1 Operational
Fire Hydraulic Single Core Spreaders 2 Operational/Needs inspected
Fire Hydraulic Single Core Cutters 2 Operational/Needs inspected
Fire Hydraulic Single Core Combi Tools 2 Operational/Needs inspected
Fire Air Bags, Controllers, and Hoses 3 Functionality uncertain
Fire Electric Pumps 2 Operational/Needs inspected
Fire Gas-Powered Pumps 2 Operational/Needs inspected
Fire Small Ram 1 Operational/Needs inspected
Fire Medium Rams 2 Operational/Needs inspected
Fire Large Rams 2 Operational/Needs inspected
Fire Single Core Hydraulic Hoses Multiple Various lengths
Fire High-Lift Jack 1 Operational
Fire Large Come Along 1 Operational
Fire Super Vac Ventilation Fan 1 Operational
Fire Wart Strut adaptors 1 Just adaptors no struts
Fire Cascade Air System 1 Replaced at Feaster FS
Fire Facility Generator 1 Replaced at Miller Road FS
Police 45 cal. Holsters 32 For Glocks
Police Kydex and Fabric Magazine Pouches 57 For Glocks
Police Cuff and Magazine Holders 3 For Glocks
Police Bicycles 3 From Property and Evidence
Police Mini Bike 1 From Property and Evidence
Police Rear Seats Dodge Chargers 4
Police Dodge Charger Center Consoles 4
Police Remote Control Car/Dog 1
Police Vehicle Safes 6 Did not fit admin vehicles
Police Used Safe from K9 Vehicle 1
Public Works Vehicle 407 1 2000 F-350
Public Works Vehicle 801 1 2008 F-250
Public Works Vehicle 530 1 2007 F-150
Public Works Vehicle 556 1 2012 International Rear loader
Public Works Christmas Wreaths 30 Many damaged beyond repair
7
RES
OLUTION 2026-01
A RESOLUT
ION AUTHORIZING THE SALE OF
OLD/DAMAGED EQUIPMENT
WHE
REAS, Council has authorized the purchase of new capital and equipment
to replace old, outdated, and/or damaged equipment and is no longer of use to
the City; and
WHEREAS, South Carolina Code of Laws Section 5-7-40 authorizes
municipalities to dispose of personal property by resolution of the Council
adopted at a public meeting; and
WHEREAS, All revenue from the sale of the equipment will be added to the
General Fund for the City of Mauldin, unless required to be added to other
restricted funds; and
WHEREAS, Upon Council approval, the items will be sold at public auction or
sold for scrap value within 60 days.
NOW THEREFORE BE IT RESOLVED Council approves on this ____ day of
January to sell the equipment listed on the attached Asset Attribute Detail Listing
at public auction with the proceeds added to the General Fund.
______
____________________
Terry Merritt, Mayor
ATTEST:
______
______________
Cindy Miller, Municipal Clerk
REVIEW
ED:
______
________________
Seth Duncan, City Administrator
8
PUBLIC WORKS COMMITTEE
AGENDA ITEM
MEETIN
G DATE: January 5, 2026
AGENDA I
TEM: 6b
TO: P
ublic Works Committee
FRO
M: Public Works Director, Matthew Fleahman
SUBJ
ECT: Sidewalk Repairs - Hyde Circle
REQUEST
The Public Works Department is requesting approval from Committee and Council to award the
contract for sidewalk repairs along Hyde Circle to R&G Construction LLC.
HISTORY/BACKGROUND
As part of the 2025 – 2026 Fiscal Year Budget for the City of Mauldin, Council approved funding
for sidewalk and trail projects to either address aging infrastructure or for new installation. With
development along Jenkins Street , Jenkins Court, and a new railway crossing, the Public Works
Department recommends sidewalk repairs along the length of Hyde Circle. The existing sidewalks
(both sides of the road) allow for connectivity between the new development, Springfield Park,
and E. Butler, where a new 10-foot mixed-used trail is being built as part of the Build a Better
Butler project. An evaluation of new sidewalks in areas underserved was considered; however,
the Public Works Department deemed it more appropriate to address existing infrastruc ture prior
to installation of any new infrastructure . Hyde Circle is also a City owned road and therefore the
City is responsible for the maintenance and upkeep of the sidewalks.
ANALYSIS or STAFF FINDINGS
On November 10, 2025, the Public Works Department released a Request for Proposal (RFP) for
the replacement of approximately 1,240 linear feet of sidewalk along Hyde Circle. The RF P was
posted on the City’s website as well as South Carolina Business Opportunities Online Edition in
accordance with the City’s Purchasing policy. The proposals were due on December 8, 2025 and
the City received only one submittal . The submittal was reviewed by staff and determined to be
complete and responsible. The submitted bid was also below the preliminary estimate as
determined by staff.
FINANCIAL IMPACT
As part of the 2025 – 2026 Fiscal Year Budget for the City of Mauldin, Council approved $255,500
for sidewalk and trail projects. The responsible bid from R&G Construction LLC listed its bid for
services at $105,435. The remaining funds wi ll be utilized for future trail development at City
Center and to evaluate new sidewalks along City owned roadways.
9
RE
COMMENDATION
Staff recommends the Public Works Committee and the City Council to award the contract for
sidewalk repairs along Hyde Circle to R&G Construction LLC.
10
11
12
13
14
15
16
17
18
PUBLIC WORKS COMMITTEE
AGENDA ITEM
MEETING
DATE: January 5, 2026
AGENDA ITEM: 6c
TO:
Public Works Committee
FR
OM: Public Works Director, Matthew Fleahman
SU
BJECT: 2026 Road Repaving Project
REQUEST
The Public Works Department is requesting approval from Committee and Council to utilize funds
from the Transportation Fund to commence a City-Wide repaving project.
HISTORY/BACKGROUND
In August 2025, City Council allocated $2 million of prior year surplus funds to the Capital
Transportation Fund. Funds were not reserved or restricted for any specific purpose and would be
used for a future transportation related capital project.
Ini
tially, Public Works intended to utilize these funds to repave Holland Road ( the largest and
longest City-owned road). On November 3, 2025, the Public Works Department released a
Request for Quotation (RFQ) for the milling and repaving of approximately 8,400 linear feet by
60 linear feet of roadway along Holland Road. The RFQ was posted on the City’s website as well
as South Carolina Business Opportunities Online Edition in accordance with the City’s Purchasing
policy. The proposals were due on December 1, 2025 and the City received only one submittal.
The submittal was reviewed by staff and determined to be complete and responsible; however, the
total cost was approximately $600,000 more than the funds transferred to the Transportation Fund
this year.
Dur
ing the RFQ process, IMS completed the roadway analysis and generated new Pavement
Condition Index (PCI) for the City’s roadways. The PCI is a 0-100 numerical rating system used
in pavement management to assess a road's overall health by visually identifying and scoring
pavement distresses like cracks, potholes, and rutting, helping authorities prioritize maintenance,
repairs, and reconstructio n to optimize infrastructure performance. A copy of the PCI scores is
attached.
ANALYSIS or STAFF FINDINGS
As part of the 2019 IMS review of the City’s roadways, a five -year paving recommendation was
generated to address roadway issues at the time and to provide a schedule to keep up with the
useful life of the City’s existing roadways. The City invested heavily to address poor and very
poor roadways and continued to budget a match to paving funds through the Greenville Legislative
19
Delegation Transportation Committee annual paving program . Unfortunately, due to significant
price increases for materials since Covid, funding allocated for road repaving has not kept up with
the City’s repaving schedule.
A r
eview of the IMS road scores indicates that currently, the City has over 8 miles of roadway
with a PCI less than 50. A PCI score less than 50 indicates that the roadway is deemed poor/very
poor. It is estimated that funds available for the Holland Road resurfacing project could address
nearly all of the roadways currently scored with a PCI less than 50. Therefore, staff is
recommending that Council allocate Capital Transportation Funds to repairing the worst roads first
instead of a single road. (Please note that several sections of Holland Road are scored very poorly
and would be repaired as part of this plan).
FINANCIAL IMPACT
During the August 2025 City Council meeting, Council approved funds in the amount of
$2,000,000 to be transferred into the Transportation Fund as part of the City of Mauldin’s 2024-
2025 Fiscal Year surplus projection and recommended expenditure plan. The requested funds for
resurfacing would be the full $2,000,000.
RECO
MMENDATION
Staff recommends the Public Works Committee and the City Council authorize funds from the
Transportation Fund to commence a City-Wide repaving project with the first priority being
roads that scored less than 50 on the most recent PCI report.
20
Source: City of Mauldin website. First collected Oct 13, 2026.