RecordWell Data

_10052026-2279

Town of Mount Pleasant · Charleston County · meeting of Oct 5, 2026 · Minutes

Open the original document More from Town of Mount Pleasant

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

TOWN OF MOUNT PLEASANT, SC PUBLIC SERVICES COMMITTEE Monday, October 5, 2026 2:00 p.m. Municipal Complex, Council Chambers 100 Ann Edwards Lane, Mount Pleasant, SC 29464 MINUTES Click here for the recording. Click here for the presentation. 1. Call to order Chair Tinkey called the meeting to order at 9:45 a.m. Council Members Laura Hyatt, John Iacofano and Alex Crosby were all present. 2. Approval of Minutes from the July 6, 2026 meeting Council Member Hyatt moved to approve the minutes seconded by Council Member Crosby. The motion carried. 3. Public Comment [None] 4. Overview of FY 2026 Quarterly Project Updates Public Services Director Andy Weis presented the fiscal year 2026 quarterly projects update. Public Services Operations Center: Following completion of the admin building, the facility was re-master planned to account for changes made during construction. The revised master plan was being prepared for resubmission in the next budget cycle. The fire department had since approached the department about co-locating spare fire trucks near the fleet maintenance building, and the master plan was being further modified to incorporate that request along with updated cost estimates. Pitt Street Bridge: A feasibility investigation was approved at the Bids and Purchases Committee that same morning. The investigation will examine different options and develop cost estimates to guide future direction on the project. draft Public Services Committee October 5, 2026 Page 2 of 6 Approximately $163,000 in lining work was completed or initiated in the first quarter across four projects, with two — Preservation Place and WoodSpring — still in progress. Approximately $400,000 in lining projects was planned for the second quarter. Two pipe replacement projects were underway. The Queens Court/Harbor Gate Drive project, valued at $190,000, was initiated due to pipes rendered unlineable by tree root intrusion. When the pipe was cleaned and televised, it was found to be structurally out of alignment from root damage, necessitating full replacement rather than lining. Approximately 20 trees were removed as part of this work. Discussion among committee members focused on whether the damage could have been avoided had trees not been planted along the drainage easement. Mr. Weis confirmed that tree roots were a primary cause and noted that imagery dating back to the 1950s showed the area originally had an open ditch that was later piped — at which point trees either were planted or grew naturally over the line. He referenced the easement ordinance, which prohibits trees within drainage easements, and the theme of "right tree, right place" from the town's tree task force. He also noted that metal pipe used in earlier decades was reaching the end of its service life, compounding the issue. Council Member John Iacofano raised questions about whether property owners are aware of stormwater easements running beneath their land. Mr. Weis acknowledged that many are not, despite easements being shown on property plats, and noted that easements typically fall along property edges — the same locations where residents prefer to plant trees. He estimated the town had roughly doubled its inventory of known pipe through neighborhood assessments, finding previously unrecorded infrastructure at nearly every location surveyed. Council Member Alex Crosby inquired about pipe depth, which Mr. Weis noted varies depending on the grade needed to convey water. Discussion touched on coordinating tree placement data with the new tree canopy position to identify and address the most vulnerable locations proactively, and to encourage appropriate planting on private property in coordination with homeowners associations. draft Public Services Committee October 5, 2026 Page 3 of 6 The Anna Knapp project was also underway, with tree removal completed. Details were addressed as part of the broader Queens Court/Harbor Gate discussion above. Two additional projects — a grate replacement at Ferry Street near the pump station and the Parker's Landing outfall — had obtained required permits and were ready to begin. The Ferry Street grate replacement was noted as a significant improvement, as the existing grate required continuous staffing during heavy rain events to prevent blockage from pine straw and debris. Regarding the Ferry Street pump station, Mr. Weis reported that two new in-ground pumps had been ordered to replace aging units. One had been successfully installed. The second pump was inadvertently shipped to Vietnam due to a mislabeling error, with the Mount Pleasant pump sent abroad and a different pump delivered locally. The matter was being resolved by the manufacturer, with the priority being whichever replacement could arrive fastest. In the interim, a jockey pump was installed to handle lower-volume events without cycling the larger pumps, extending their service life. A movable generator remains on site. The Chair commended the department for its responsiveness to neighboring residents' concerns regarding noise. One structure repair was completed in the first quarter at Palmetto Hall for approximately $12,000. Approximately $253,000 in structure repairs was planned for the second quarter. Approximately $150,000 in ditch maintenance was completed in the first quarter, with $131,000 planned for the second quarter. Mr. Weis emphasized the role of ditch maintenance in preventing flooding, crediting the investment for the town's performance during the previous night's rain event. The David Simmons boardwalk rehabilitation was completed for approximately $287,000. The Shem Creek boardwalk replacement design and rough order-of-magnitude pricing were approved at the Bids and Purchases Committee that morning, to be executed in phases under the CMP. draft Public Services Committee October 5, 2026 Page 4 of 6 Mr. Weis also reported a failure of the floating dock at Shem Creek during the previous week's king tides. The dock was believed to have become pinched on a piling during an extreme low tide event and then stuck as the tide rose. A contractor removed the dock via barge, and it was being taken out of the water for inspection to determine whether repair or full replacement was necessary. Council Member Iacofano noted for the record that the dock's removal was unrelated to ongoing discussions regarding charter fishermen; Mr. Weis confirmed the damage was tide-related. Approximately $97,000 in sidewalk repairs was completed in the first quarter, with approximately $423,000 planned for the second quarter. First-quarter work included assessments at Town Hall and the Darby building. The Darby assessment identified an estimated $1,500,000 in repairs and renovations needed over the coming years. Completed work included the Alhambra Hall parking lot and termite repair at the Sweetgrass Basket Pavilion. Second-quarter plans included bidding the Town Hall gym sewer line replacement, beginning Darby repairs, replacing the roof at Park West Pool, and repaving the Edwards Park parking lot. Regarding Edwards Park, the Chair noted requests from neighboring residents for landscaping buffers along the parking lot and suggested deferring broader park landscaping until the lay-down yard situation is resolved. Mr. Weis concurred, noting that the parking lot repaving and remarking would improve usability and help redirect residents away from parking under trees — an issue that had been addressed with signage and police enforcement. Mr. Weis reported that the Highway 17 median landscaping project was nearing the point of execution, with design completed, DOT permitting finalized, and plans at the appropriate maturity for phased installation. The total rough estimate is approximately $2,600,000, with funding built up over time through the right-of-way maintenance CMP account. Work was expected to begin in the second quarter, proceeding from one end of the corridor to the other as funding allows, covering medians from the bridge through past Darrell Creek Trail. draft Public Services Committee October 5, 2026 Page 5 of 6 The Chair and Mr. Weis discussed the importance of proactive public communication given the significant visual change the project will bring, noting that much of the existing plant material has outlived its useful life or been damaged by vehicle impacts. Much of the work will occur at night due to road closure requirements. The design philosophy prioritizes lower maintenance, improved safety for maintenance crews working near 60-mph traffic, and keeping plantings away from travel lanes. Mr. Weis noted the project had been in development for approximately seven to eight years. Council Member Crosby inquired whether the full corridor was being addressed or only damaged sections; Mr. Weis confirmed all medians from the bridge outward would be touched, with existing healthy trees preserved and missing or damaged trees replanted. Mr. Weis also noted the design concepts were being shared with EDS for incorporation into other roadway projects, including potentially Highway 41. Second-quarter landscaping plans also included renovation work at Whipple and tree pruning on South Morgans Point Road. Design for the Jones Center batting cages was completed, with materials received and construction set to begin. Lighting upgrades at Sloan Field were approved and set to start. Lighting improvements at Moultrie were also under consideration. The playing surface at Moultrie was resurfaced during the summer in coordination with Charleston County School District (CCSD) using their contractor, with the town funding the work; irrigation improvements were included. Mr. Weis explained that coordination with the recreation department and CCSD was required to identify a window between the end and resumption of the school year. The Chair noted that James B. Edwards school had successfully used light shields to reduce light pollution onto neighboring properties and encouraged the department to apply similar solutions where sensitivity exists. Mr. Weis confirmed that the lighting layouts for ball field projects are designed to minimize light pollution while optimizing playing conditions. He also noted that the current phase of lighting replacement follows an earlier effort to replace all wood-pole fixtures, with the remaining work addressing outdated fixtures on concrete poles. draft Public Services Committee October 5, 2026 Page 6 of 6 Council Member Iacofano raised the question of field usage, referencing prior discussions with the education committee about maximizing use of the shared Moultrie field. Mr. Weis acknowledged the ongoing coordination challenge of securing a maintenance window given school scheduling constraints. The retroreflectivity replacement program was nearly complete. An additional 160 signs were identified outside the original scope and were being coordinated with EDS for installation, after which the project would effectively be closed and shifted to a routine replacement cycle. The town hall generator project — part of a FEMA grant that also involved relocating the old generator to the gym — was substantially complete and fully functional, though minor remaining tasks were pending resolution of issues on FEMA's end, which had issued a temporary stop-work order while processing its portion of the funding. 5. Adjourn Chair Tinkey thanked Mr. Weis for his comprehensive report, noting that keeping ongoing projects allows residents to see progress on issues they care about and to raise items not yet on the list. There being no further business, the meeting was adjourned at 2:42 P.M. Respectfully submitted, Jason Boehm Public Services Administrative Division Chief October 5, 2026 draft

Source: Town of Mount Pleasant website. First collected Oct 13, 2026.