TOWN OF MOUNT PLEASANT, SC
PUBLIC SERVICES COMMITTEE
Monday, October 5, 2026
2:00 p.m.
Municipal Complex, Council Chambers
100 Ann Edwards Lane, Mount Pleasant, SC 29464
MINUTES
Click here for the recording.
Click here for the presentation.
1. Call to order
Chair Tinkey called the meeting to order at 9:45 a.m. Council
Members Laura Hyatt, John Iacofano and Alex Crosby were all
present.
2. Approval of Minutes from the July 6, 2026 meeting
Council Member Hyatt moved to approve the minutes seconded by
Council Member Crosby. The motion carried.
3. Public Comment
[None]
4. Overview of FY 2026 Quarterly Project Updates
Public Services Director Andy Weis presented the fiscal year 2026
quarterly projects update.
Public Services Operations Center: Following completion of the
admin building, the facility was re-master planned to account for
changes made during construction. The revised master plan was
being prepared for resubmission in the next budget cycle. The fire
department had since approached the department about co-locating
spare fire trucks near the fleet maintenance building, and the master
plan was being further modified to incorporate that request along with
updated cost estimates.
Pitt Street Bridge: A feasibility investigation was approved at the Bids
and Purchases Committee that same morning. The investigation will
examine different options and develop cost estimates to guide future
direction on the project.
draft
Public Services Committee
October 5, 2026
Page 2 of 6
Approximately $163,000 in lining work was completed or initiated in
the first quarter across four projects, with two — Preservation Place
and WoodSpring — still in progress. Approximately $400,000 in lining
projects was planned for the second quarter.
Two pipe replacement projects were underway. The Queens
Court/Harbor Gate Drive project, valued at $190,000, was initiated
due to pipes rendered unlineable by tree root intrusion. When the
pipe was cleaned and televised, it was found to be structurally out of
alignment from root damage, necessitating full replacement rather
than lining. Approximately 20 trees were removed as part of this
work.
Discussion among committee members focused on whether the
damage could have been avoided had trees not been planted along
the drainage easement. Mr. Weis confirmed that tree roots were a
primary cause and noted that imagery dating back to the 1950s
showed the area originally had an open ditch that was later piped —
at which point trees either were planted or grew naturally over the
line. He referenced the easement ordinance, which prohibits trees
within drainage easements, and the theme of "right tree, right place"
from the town's tree task force. He also noted that metal pipe used in
earlier decades was reaching the end of its service life, compounding
the issue.
Council Member John Iacofano raised questions about whether
property owners are aware of stormwater easements running
beneath their land. Mr. Weis acknowledged that many are not,
despite easements being shown on property plats, and noted that
easements typically fall along property edges — the same locations
where residents prefer to plant trees. He estimated the town had
roughly doubled its inventory of known pipe through neighborhood
assessments, finding previously unrecorded infrastructure at nearly
every location surveyed.
Council Member Alex Crosby inquired about pipe depth, which Mr.
Weis noted varies depending on the grade needed to convey water.
Discussion touched on coordinating tree placement data with the new
tree canopy position to identify and address the most vulnerable
locations proactively, and to encourage appropriate planting on
private property in coordination with homeowners associations.
draft
Public Services Committee
October 5, 2026
Page 3 of 6
The Anna Knapp project was also underway, with tree removal
completed. Details were addressed as part of the broader Queens
Court/Harbor Gate discussion above.
Two additional projects — a grate replacement at Ferry Street near
the pump station and the Parker's Landing outfall — had obtained
required permits and were ready to begin. The Ferry Street grate
replacement was noted as a significant improvement, as the existing
grate required continuous staffing during heavy rain events to prevent
blockage from pine straw and debris.
Regarding the Ferry Street pump station, Mr. Weis reported that two
new in-ground pumps had been ordered to replace aging units. One
had been successfully installed. The second pump was inadvertently
shipped to Vietnam due to a mislabeling error, with the Mount
Pleasant pump sent abroad and a different pump delivered locally.
The matter was being resolved by the manufacturer, with the priority
being whichever replacement could arrive fastest. In the interim, a
jockey pump was installed to handle lower-volume events without
cycling the larger pumps, extending their service life. A movable
generator remains on site. The Chair commended the department for
its responsiveness to neighboring residents' concerns regarding
noise.
One structure repair was completed in the first quarter at Palmetto
Hall for approximately $12,000. Approximately $253,000 in structure
repairs was planned for the second quarter.
Approximately $150,000 in ditch maintenance was completed in the
first quarter, with $131,000 planned for the second quarter. Mr. Weis
emphasized the role of ditch maintenance in preventing flooding,
crediting the investment for the town's performance during the
previous night's rain event.
The David Simmons boardwalk rehabilitation was completed for
approximately $287,000. The Shem Creek boardwalk replacement
design and rough order-of-magnitude pricing were approved at the
Bids and Purchases Committee that morning, to be executed in
phases under the CMP.
draft
Public Services Committee
October 5, 2026
Page 4 of 6
Mr. Weis also reported a failure of the floating dock at Shem Creek
during the previous week's king tides. The dock was believed to have
become pinched on a piling during an extreme low tide event and
then stuck as the tide rose. A contractor removed the dock via barge,
and it was being taken out of the water for inspection to determine
whether repair or full replacement was necessary. Council Member
Iacofano noted for the record that the dock's removal was unrelated
to ongoing discussions regarding charter fishermen; Mr. Weis
confirmed the damage was tide-related.
Approximately $97,000 in sidewalk repairs was completed in the first
quarter, with approximately $423,000 planned for the second quarter.
First-quarter work included assessments at Town Hall and the Darby
building. The Darby assessment identified an estimated $1,500,000
in repairs and renovations needed over the coming years. Completed
work included the Alhambra Hall parking lot and termite repair at the
Sweetgrass Basket Pavilion. Second-quarter plans included bidding
the Town Hall gym sewer line replacement, beginning Darby repairs,
replacing the roof at Park West Pool, and repaving the Edwards Park
parking lot.
Regarding Edwards Park, the Chair noted requests from neighboring
residents for landscaping buffers along the parking lot and suggested
deferring broader park landscaping until the lay-down yard situation is
resolved. Mr. Weis concurred, noting that the parking lot repaving and
remarking would improve usability and help redirect residents away
from parking under trees — an issue that had been addressed with
signage and police enforcement.
Mr. Weis reported that the Highway 17 median landscaping project
was nearing the point of execution, with design completed, DOT
permitting finalized, and plans at the appropriate maturity for phased
installation. The total rough estimate is approximately $2,600,000,
with funding built up over time through the right-of-way maintenance
CMP account. Work was expected to begin in the second quarter,
proceeding from one end of the corridor to the other as funding
allows, covering medians from the bridge through past Darrell Creek
Trail.
draft
Public Services Committee
October 5, 2026
Page 5 of 6
The Chair and Mr. Weis discussed the importance of proactive public
communication given the significant visual change the project will
bring, noting that much of the existing plant material has outlived its
useful life or been damaged by vehicle impacts. Much of the work will
occur at night due to road closure requirements. The design
philosophy prioritizes lower maintenance, improved safety for
maintenance crews working near 60-mph traffic, and keeping
plantings away from travel lanes. Mr. Weis noted the project had
been in development for approximately seven to eight years.
Council Member Crosby inquired whether the full corridor was being
addressed or only damaged sections; Mr. Weis confirmed all medians
from the bridge outward would be touched, with existing healthy trees
preserved and missing or damaged trees replanted. Mr. Weis also
noted the design concepts were being shared with EDS for
incorporation into other roadway projects, including potentially
Highway 41.
Second-quarter landscaping plans also included renovation work at
Whipple and tree pruning on South Morgans Point Road.
Design for the Jones Center batting cages was completed, with
materials received and construction set to begin. Lighting upgrades at
Sloan Field were approved and set to start. Lighting improvements at
Moultrie were also under consideration. The playing surface at
Moultrie was resurfaced during the summer in coordination with
Charleston County School District (CCSD) using their contractor, with
the town funding the work; irrigation improvements were included. Mr.
Weis explained that coordination with the recreation department and
CCSD was required to identify a window between the end and
resumption of the school year.
The Chair noted that James B. Edwards school had successfully
used light shields to reduce light pollution onto neighboring properties
and encouraged the department to apply similar solutions where
sensitivity exists. Mr. Weis confirmed that the lighting layouts for ball
field projects are designed to minimize light pollution while optimizing
playing conditions. He also noted that the current phase of lighting
replacement follows an earlier effort to replace all wood-pole fixtures,
with the remaining work addressing outdated fixtures on concrete
poles.
draft
Public Services Committee
October 5, 2026
Page 6 of 6
Council Member Iacofano raised the question of field usage,
referencing prior discussions with the education committee about
maximizing use of the shared Moultrie field. Mr. Weis acknowledged
the ongoing coordination challenge of securing a maintenance
window given school scheduling constraints.
The retroreflectivity replacement program was nearly complete. An
additional 160 signs were identified outside the original scope and
were being coordinated with EDS for installation, after which the
project would effectively be closed and shifted to a routine
replacement cycle.
The town hall generator project — part of a FEMA grant that also
involved relocating the old generator to the gym — was substantially
complete and fully functional, though minor remaining tasks were
pending resolution of issues on FEMA's end, which had issued a
temporary stop-work order while processing its portion of the funding.
5. Adjourn
Chair Tinkey thanked Mr. Weis for his comprehensive report, noting
that keeping ongoing projects allows residents to see progress on
issues they care about and to raise items not yet on the list.
There being no further business, the meeting was adjourned at 2:42
P.M.
Respectfully submitted,
Jason Boehm
Public Services Administrative Division Chief
October 5, 2026