RecordWell Data

_08312026-2254

Town of Mount Pleasant · Charleston County · meeting of Aug 31, 2026 · Minutes

Open the original document More from Town of Mount Pleasant

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

TOWN OF MOUNT PLEASANT, SC WATER SUPPLY AND RESOURCES COMMITTEE Monday, August 31, 2026 8:45 a.m. Municipal Complex, Council Chambers 100 Ann Edwards Lane, Mount Pleasant, SC 29464 MINUTES Listen to recording here 1. Call To Order Chairman Jake Rambo called meeting to order at 8:45 a.m. Council Members Howard Chapman and Laura Hyatt were present. 2. Approval Of Minutes From The April 6, 2026 Meeting Council Member Chapman moved to approve the minutes from the April 6, 2026 meeting, seconded by Council Member Hyatt. The motion passed unanimously. 3. Mount Pleasant Waterworks program and project updates draft Water Supply and Resources Committee August 31, 2026 Page 2 of 15 draft Water Supply and Resources Committee August 31, 2026 Page 3 of 15 Mr. Allan Clum, General Manager of Mount Pleasant Water Works, introduced the Campaign to Connect initiative, an outreach effort spanning two fiscal years aimed at ensuring all properties within the town limits with available sewer access are informed of the resources available to them, including the Clean Water Credit. Approximately 60 properties have been identified as having sewer availability. Both the Mount Pleasant Waterworks (MPW) resolution and the Town of Mount Pleasant ordinance require connection when availability exists. Following this effort, MPW plans to transition into a "Campaign to Protect" during FY29, during which assessments will begin for properties that have not connected. The goal is to capture all 60 properties over the course of three years. 4. Discussion And Assessment Of The Potential Impact Of Data Centers draft Water Supply and Resources Committee August 31, 2026 Page 4 of 15 Data Centers and Utility Demand Mr. Clum addressed the growing demand that data centers place on water and electrical resources, describing the topic as "a thirst for resources." Hyperscale data centers — the large-scale facilities being constructed across South Carolina — can consume between 5 and 7 million gallons of water per day and represent investments of approximately 2 billion dollars or more. One such facility under construction in Spartanburg is estimated to cost over 3 billion dollars. draft Water Supply and Resources Committee August 31, 2026 Page 5 of 15 MPW's first encounter with the data center issue occurred in 2017, when Google was constructing a facility in the area. At that time, MPW was draft Water Supply and Resources Committee August 31, 2026 Page 6 of 15 simultaneously applying for a groundwater withdrawal permit. Following several years of discussions, Google transitioned to surface water, with its groundwater well reserved solely for emergency backup and generator testing. As a consequence of those discussions and the broader competition for the Charleston aquifer, MPW's permitted groundwater withdrawal was reduced from approximately 10.8 million gallons per day to 6.6 million gallons per day — a 39 percent reduction. While there was no immediate operational impact, this reduction significantly restricted future growth for MPW within the Charleston aquifer. Mr. Clum noted that the tri- county area falls within the Trident Capacity Based Design (CBD) Capacity Use Area, one of six such areas in the state, which requires a permit for any groundwater withdrawal exceeding 3 million gallons per month. MPW's Strategic Response — Water Resources In response to the competitive pressure on the Charleston aquifer, MPW has been drilling Deep Well 6, which taps into a different and previously untapped aquifer in the region. This well is intended to serve as Mount Pleasant Waterworks' primary water supply for the next hundred years. draft Water Supply and Resources Committee August 31, 2026 Page 7 of 15 MPW is also exploring potable reuse and other alternate water sources as part of its long-term strategy. In response to a question from Council Member Howard Chapman regarding whether the prospect of a new aquifer resource was attracting data center interest to Mount Pleasant, Mr. Clum indicated that while resource demand has risen broadly across the state, he had not been involved in any local discussions regarding a data center siting in Mount Pleasant. The Department of Environmental Services (DES) similarly confirmed it was unaware of any interest in siting a data center in the Mount Pleasant service area, noting that it is very unlikely an additional groundwater withdrawal permit would be issued there and that "data centers should be placed in areas of the state where abundant energy and water resources exist." Three large data centers were noted to be located in the broader surrounding area. MPW's Strategic Response — Electrical Resources draft Water Supply and Resources Committee August 31, 2026 Page 8 of 15 Chris Martin, MPW's Operational Technology Department Head, presented on the electrical dimension of the data center issue. He identified two primary risks for MPW stemming from increased data center activity. First, electrical costs have risen significantly since 2022, largely driven by the power demands of data centers, and are expected to continue rising. Because MPW cannot produce water without electricity, this cost escalation presents a material financial risk. Second, a recent Department of Energy report projects that grid reliability will decline over the next five years, with brownouts and blackouts becoming more frequent — a development that would reduce the reliability of water production operations. draft Water Supply and Resources Committee August 31, 2026 Page 9 of 15 To address both risks, MPW has conducted a feasibility study on microgrids — localized, independent power systems that incorporate draft Water Supply and Resources Committee August 31, 2026 Page 10 of 15 renewable generation assets such as solar photovoltaic systems, combined with battery storage and generator backup. Microgrids would allow MPW to generate its own power at reduced cost and insulate operations from grid instability. A battery energy storage system (BESS) was highlighted as a particularly advantageous technology, enabling MPW to charge batteries when electricity rates are low and discharge when rates are high — especially relevant given emerging time-of-use rate structures already being implemented in Georgia and North Carolina. MPW has decided to pursue pilot microgrid installations at its operations center on Rifle Range Road and at one of its reverse osmosis (RO) treatment plants. Mr. Clum noted that the microgrid would also extend generator diesel fuel efficiency by approximately 50 percent, providing additional resilience during extended outages such as those caused by hurricanes. Council Member Chapman inquired about the pending merger between Dominion Energy and NextEra Energy. Mr. Clum noted his understanding that NextEra had become or was becoming the parent company, but acknowledged he was not in a position to speak on behalf of either utility. Council Member Hyatt asked about the space requirements for such a system and was reassured that sufficient space exists on MPW's existing properties. 5. Review Of Mount Pleasant Waterworks' "Campaign To Connect": Sewer Connections Within Town Limits draft Water Supply and Resources Committee August 31, 2026 Page 11 of 15 SCIIP Project Completion Mr. Clum reported that the SCIIP (Sewer Capacity and Infrastructure Improvement Program) projects had been completed on time and under budget. The scope was extended through the residual savings, and 125 properties in the Shem Creek area, 7 Mile community, and Snowden community now have access to public water and sewer. This outcome also eliminated 125 septic tanks, providing direct public health and environmental benefits. Mr. Clum credited the Clean Water Credit program with making these connections possible and noted that the project exemplified MPW's vision of "enhancing lives." draft Water Supply and Resources Committee August 31, 2026 Page 12 of 15 Coleman Force Main Project Mr. Clum provided an update on the Coleman Force Main project, a roughly 15 million dollar infrastructure replacement project in the Coleman corridor, with a duration from summer 2026 to summer 2027. Subsurface utility work at the highest engineering level (Level A) is expected to begin shortly, a deliberate approach informed by past delays experienced during a prior Highway 17 project. Drilling is expected to begin in March, with periodic traffic impacts anticipated throughout the project. draft Water Supply and Resources Committee August 31, 2026 Page 13 of 15 Awards and Recognition MPW received its 11th Best Places to Work in South Carolina designation, placing 4th overall in the state. The organization also received the national Energy and Utilities Top Workplaces award in May 2026 and has been shortlisted for the USA TODAY Top Workplaces national award, with results expected in November. MPW's Consumer Confidence Report (CCR) was recognized as the second-best annual water quality report nationally, trailing only Philadelphia. Additionally, MPW was awarded a coastal community grant of approximately $38,000 in partnership with the Water Keepers organization to fund a septic repair grant program for eligible customers, with costs borne by the grant rather than the ratepayers. Public Comment Prior to committee discussion, two members of the public offered comments. Lia Colabello, identified as a member of the inaugural Green Commission, expressed appreciation for the passage of the standing Green Commission draft Water Supply and Resources Committee August 31, 2026 Page 14 of 15 ordinance (Ordinance 26044) on first reading. She raised several concerns regarding the current draft, including the following: the mission statement in Section 32.25 does not align with the mission statement developed and approved by the version 1 Green Commission in 2023; Section 32.26 could more robustly reflect the strategic work and priority action areas developed by the commission since 2025; and Section 32.27(e), which requires Green Commission meeting agenda items to be approved by Town Council, could undermine the independence of the commission. She recommended that the committee consult the commission's annual reports to better reflect the actual work of the commission in the ordinance language. Council Member Chapman requested that her written materials be submitted to the clerk for distribution to staff. Christine Von Kolnitz expressed support for the microgrid initiative, drawing on her personal experience with residential solar since 2019. She also voiced opposition to data centers in Mount Pleasant and noted that the NextEra-Dominion merger had not yet been finalized, suggesting that interested parties still had an opportunity to contact their legislators. 6. Review Of Green Commission Structure And Project Focus Staff Presentation Town Administrator Eric DeMoura introduced the item, noting that Town Council had referred it to both the Water Supply and Resources Committee and the Flood Resilience Committee. He explained that the discussion centered on potentially focusing the Green Commission's work on a defined set of high-priority, high-impact topics rather than a broad scope. James Aton, Director of Engineering and Development Services, presented three proposed focus areas for the Green Commission, organized from near-term to longer-term in their implementation horizon: Residential Low Impact Development (LID) Incentive Program: Development of an incentive program to encourage residential property owners and redevelopment projects to exceed required LID standards through features such as pollinator gardens and bioswales. draft Water Supply and Resources Committee August 31, 2026 Page 15 of 15 Sea Level Rise Analysis: Assessment of existing vulnerable infrastructure and areas within the town, development of prioritized improvement plans based on best practices, and provision of resources to homeowners to bolster their own resilience. Mr. Aton noted that the City of Charleston's work in this area provides a useful framework. Eco Corridor Development: Implementation of best practices to restore environmental systems, promote natural habitat, and develop short- and long-range implementation plans. Mr. Aton noted that these three areas represent a selection from approximately a dozen topics developed by the Environmental and Engineering Services Department and that detailed engagement with the Green Commission would follow once members are appointed or reappointed. Council Member Hyatt expressed strong support for extending LID practices to residential areas, noting the importance of working with homeowners and homeowners associations (HOAs). Chairman Rambo noted that this item would also be taken up at the Flood Resilience Committee meeting later that day and would appear on the Town Council agenda the following Tuesday. He indicated he would review the discrepancies raised in public comment prior to those discussions. 7. Adjourn With no further business, Chairman Rambo adjourned the meeting at 9:15 a.m. Respectfully submitted, Lisa Canney Deputy Clerk of Council August 31, 2026 draft

Source: Town of Mount Pleasant website. First collected Oct 13, 2026.