TOWN OF MOUNT PLEASANT, SC
WATER SUPPLY AND RESOURCES COMMITTEE
Monday, August 31, 2026
8:45 a.m.
Municipal Complex, Council Chambers
100 Ann Edwards Lane, Mount Pleasant, SC 29464
MINUTES
Listen to recording here
1. Call To Order
Chairman Jake Rambo called meeting to order at 8:45 a.m. Council
Members Howard Chapman and Laura Hyatt were present.
2. Approval Of Minutes From The April 6, 2026 Meeting
Council Member Chapman moved to approve the minutes from the April 6,
2026 meeting, seconded by Council Member Hyatt. The motion passed
unanimously.
3. Mount Pleasant Waterworks program and project updates
draft
Water Supply and Resources Committee
August 31, 2026
Page 2 of 15
draft
Water Supply and Resources Committee
August 31, 2026
Page 3 of 15
Mr. Allan Clum, General Manager of Mount Pleasant Water Works,
introduced the Campaign to Connect initiative, an outreach effort spanning
two fiscal years aimed at ensuring all properties within the town limits with
available sewer access are informed of the resources available to them,
including the Clean Water Credit. Approximately 60 properties have been
identified as having sewer availability. Both the Mount Pleasant
Waterworks (MPW) resolution and the Town of Mount Pleasant ordinance
require connection when availability exists. Following this effort, MPW
plans to transition into a "Campaign to Protect" during FY29, during which
assessments will begin for properties that have not connected. The goal is
to capture all 60 properties over the course of three years.
4. Discussion And Assessment Of The Potential Impact Of Data
Centers
draft
Water Supply and Resources Committee
August 31, 2026
Page 4 of 15
Data Centers and Utility Demand
Mr. Clum addressed the growing demand that data centers place on water
and electrical resources, describing the topic as "a thirst for resources."
Hyperscale data centers — the large-scale facilities being constructed
across South Carolina — can consume between 5 and 7 million gallons of
water per day and represent investments of approximately 2 billion dollars
or more. One such facility under construction in Spartanburg is estimated to
cost over 3 billion dollars.
draft
Water Supply and Resources Committee
August 31, 2026
Page 5 of 15
MPW's first encounter with the data center issue occurred in 2017, when
Google was constructing a facility in the area. At that time, MPW was
draft
Water Supply and Resources Committee
August 31, 2026
Page 6 of 15
simultaneously applying for a groundwater withdrawal permit. Following
several years of discussions, Google transitioned to surface water, with its
groundwater well reserved solely for emergency backup and generator
testing. As a consequence of those discussions and the broader
competition for the Charleston aquifer, MPW's permitted groundwater
withdrawal was reduced from approximately 10.8 million gallons per day to
6.6 million gallons per day — a 39 percent reduction. While there was no
immediate operational impact, this reduction significantly restricted future
growth for MPW within the Charleston aquifer. Mr. Clum noted that the tri-
county area falls within the Trident Capacity Based Design (CBD) Capacity
Use Area, one of six such areas in the state, which requires a permit for
any groundwater withdrawal exceeding 3 million gallons per month.
MPW's Strategic Response — Water Resources
In response to the competitive pressure on the Charleston aquifer, MPW
has been drilling Deep Well 6, which taps into a different and previously
untapped aquifer in the region. This well is intended to serve as Mount
Pleasant Waterworks' primary water supply for the next hundred years.
draft
Water Supply and Resources Committee
August 31, 2026
Page 7 of 15
MPW is also exploring potable reuse and other alternate water sources as
part of its long-term strategy.
In response to a question from Council Member Howard Chapman
regarding whether the prospect of a new aquifer resource was attracting
data center interest to Mount Pleasant, Mr. Clum indicated that while
resource demand has risen broadly across the state, he had not been
involved in any local discussions regarding a data center siting in Mount
Pleasant. The Department of Environmental Services (DES) similarly
confirmed it was unaware of any interest in siting a data center in the
Mount Pleasant service area, noting that it is very unlikely an additional
groundwater withdrawal permit would be issued there and that "data
centers should be placed in areas of the state where abundant energy and
water resources exist." Three large data centers were noted to be located
in the broader surrounding area.
MPW's Strategic Response — Electrical Resources
draft
Water Supply and Resources Committee
August 31, 2026
Page 8 of 15
Chris Martin, MPW's Operational Technology Department Head, presented
on the electrical dimension of the data center issue. He identified two
primary risks for MPW stemming from increased data center activity. First,
electrical costs have risen significantly since 2022, largely driven by the
power demands of data centers, and are expected to continue rising.
Because MPW cannot produce water without electricity, this cost escalation
presents a material financial risk. Second, a recent Department of Energy
report projects that grid reliability will decline over the next five years, with
brownouts and blackouts becoming more frequent — a development that
would reduce the reliability of water production operations.
draft
Water Supply and Resources Committee
August 31, 2026
Page 9 of 15
To address both risks, MPW has conducted a feasibility study on
microgrids — localized, independent power systems that incorporate
draft
Water Supply and Resources Committee
August 31, 2026
Page 10 of 15
renewable generation assets such as solar photovoltaic systems, combined
with battery storage and generator backup. Microgrids would allow MPW to
generate its own power at reduced cost and insulate operations from grid
instability. A battery energy storage system (BESS) was highlighted as a
particularly advantageous technology, enabling MPW to charge batteries
when electricity rates are low and discharge when rates are high —
especially relevant given emerging time-of-use rate structures already
being implemented in Georgia and North Carolina.
MPW has decided to pursue pilot microgrid installations at its operations
center on Rifle Range Road and at one of its reverse osmosis (RO)
treatment plants. Mr. Clum noted that the microgrid would also extend
generator diesel fuel efficiency by approximately 50 percent, providing
additional resilience during extended outages such as those caused by
hurricanes.
Council Member Chapman inquired about the pending merger between
Dominion Energy and NextEra Energy. Mr. Clum noted his understanding
that NextEra had become or was becoming the parent company, but
acknowledged he was not in a position to speak on behalf of either utility.
Council Member Hyatt asked about the space requirements for such a
system and was reassured that sufficient space exists on MPW's existing
properties.
5. Review Of Mount Pleasant Waterworks' "Campaign To Connect":
Sewer Connections Within Town Limits
draft
Water Supply and Resources Committee
August 31, 2026
Page 11 of 15
SCIIP Project Completion
Mr. Clum reported that the SCIIP (Sewer Capacity and Infrastructure
Improvement Program) projects had been completed on time and under
budget. The scope was extended through the residual savings, and 125
properties in the Shem Creek area, 7 Mile community, and Snowden
community now have access to public water and sewer. This outcome also
eliminated 125 septic tanks, providing direct public health and
environmental benefits. Mr. Clum credited the Clean Water Credit program
with making these connections possible and noted that the project
exemplified MPW's vision of "enhancing lives."
draft
Water Supply and Resources Committee
August 31, 2026
Page 12 of 15
Coleman Force Main Project
Mr. Clum provided an update on the Coleman Force Main project, a
roughly 15 million dollar infrastructure replacement project in the Coleman
corridor, with a duration from summer 2026 to summer 2027. Subsurface
utility work at the highest engineering level (Level A) is expected to begin
shortly, a deliberate approach informed by past delays experienced during
a prior Highway 17 project. Drilling is expected to begin in March, with
periodic traffic impacts anticipated throughout the project.
draft
Water Supply and Resources Committee
August 31, 2026
Page 13 of 15
Awards and Recognition
MPW received its 11th Best Places to Work in South Carolina designation,
placing 4th overall in the state. The organization also received the national
Energy and Utilities Top Workplaces award in May 2026 and has been
shortlisted for the USA TODAY Top Workplaces national award, with
results expected in November. MPW's Consumer Confidence Report
(CCR) was recognized as the second-best annual water quality report
nationally, trailing only Philadelphia. Additionally, MPW was awarded a
coastal community grant of approximately $38,000 in partnership with the
Water Keepers organization to fund a septic repair grant program for
eligible customers, with costs borne by the grant rather than the ratepayers.
Public Comment
Prior to committee discussion, two members of the public offered
comments.
Lia Colabello, identified as a member of the inaugural Green Commission,
expressed appreciation for the passage of the standing Green Commission
draft
Water Supply and Resources Committee
August 31, 2026
Page 14 of 15
ordinance (Ordinance 26044) on first reading. She raised several concerns
regarding the current draft, including the following: the mission statement in
Section 32.25 does not align with the mission statement developed and
approved by the version 1 Green Commission in 2023; Section 32.26 could
more robustly reflect the strategic work and priority action areas developed
by the commission since 2025; and Section 32.27(e), which requires Green
Commission meeting agenda items to be approved by Town Council, could
undermine the independence of the commission. She recommended that
the committee consult the commission's annual reports to better reflect the
actual work of the commission in the ordinance language. Council Member
Chapman requested that her written materials be submitted to the clerk for
distribution to staff.
Christine Von Kolnitz expressed support for the microgrid initiative, drawing
on her personal experience with residential solar since 2019. She also
voiced opposition to data centers in Mount Pleasant and noted that the
NextEra-Dominion merger had not yet been finalized, suggesting that
interested parties still had an opportunity to contact their legislators.
6. Review Of Green Commission Structure And Project Focus
Staff Presentation
Town Administrator Eric DeMoura introduced the item, noting that Town
Council had referred it to both the Water Supply and Resources Committee
and the Flood Resilience Committee. He explained that the discussion
centered on potentially focusing the Green Commission's work on a
defined set of high-priority, high-impact topics rather than a broad scope.
James Aton, Director of Engineering and Development Services, presented
three proposed focus areas for the Green Commission, organized from
near-term to longer-term in their implementation horizon:
Residential Low Impact Development (LID) Incentive Program:
Development of an incentive program to encourage residential property
owners and redevelopment projects to exceed required LID standards
through features such as pollinator gardens and bioswales.
draft
Water Supply and Resources Committee
August 31, 2026
Page 15 of 15
Sea Level Rise Analysis: Assessment of existing vulnerable infrastructure
and areas within the town, development of prioritized improvement plans
based on best practices, and provision of resources to homeowners to
bolster their own resilience. Mr. Aton noted that the City of Charleston's
work in this area provides a useful framework.
Eco Corridor Development: Implementation of best practices to restore
environmental systems, promote natural habitat, and develop short- and
long-range implementation plans.
Mr. Aton noted that these three areas represent a selection from
approximately a dozen topics developed by the Environmental and
Engineering Services Department and that detailed engagement with the
Green Commission would follow once members are appointed or
reappointed. Council Member Hyatt expressed strong support for extending
LID practices to residential areas, noting the importance of working with
homeowners and homeowners associations (HOAs).
Chairman Rambo noted that this item would also be taken up at the Flood
Resilience Committee meeting later that day and would appear on the
Town Council agenda the following Tuesday. He indicated he would review
the discrepancies raised in public comment prior to those discussions.
7. Adjourn
With no further business, Chairman Rambo adjourned the meeting at 9:15
a.m.
Respectfully submitted,
Lisa Canney
Deputy Clerk of Council
August 31, 2026