RecordWell Data

_08262026-2250

Town of Mount Pleasant · Charleston County · meeting of Aug 26, 2026 · Minutes

Open the original document More from Town of Mount Pleasant

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

TOWN OF MOUNT PLEASANT, SOUTH CAROLINA COMMERCIAL DESIGN REVIEW BOARD AUGUST 26, 2026 MINUTES STAFF REPORT Present: Lee Cave, Chair, Richard Lambert, Elissa Morrison, Timothy Kiel, Robert Sachs (entered at 5:40 pm). Absent: Abigail Richardson, Daniel Cruz. Staff: Peter Stone, Cecilia Marshall, Lynnette Lynes Mr. Cave called the meeting to order at 5:02 pm. A. Approval of Agenda Mr. Lambert moved for approval of t he agenda. Ms. Morrison seconded the motion. All in favor. B. Consent Motions Ms. Morrison moved for consent approval of the following items including staff comments. Mr. Kiel seconded the motion. All in favor. C. Approval of Minutes Mr. Lambert moved for approval of the minutes . Ms. Morrison seconded the motion. All in favor. D. General Public Comment Mr. George Freeman, 2347 Hwy 14 N, Pres ident of CAGE, spoke regarding the Crooked Hammick Revisions and expressed concern with noise pollution. He suggested that due to the proximity of the project to the residential neighborhood, the noise should be contained. Ms. Lisa Schnipke, 185 Mossy Oak Way, spoke regarding the Crooked Hammick Revisions and that it is already under way even though it is on the agenda for preliminary approval. She hoped that comment on the project could still be taken into consideration. Design Review Board August 26, 2026 Page 2 of 8 E. General Correspondence There being no correspondence, Mr. Cave continued with the agenda. F. Business 1. Chase Bank, 860 Coleman Blvd, TMS # 532-03-00-087, Preliminary Review of Site, Landscape, and Architecture Mr. Stone and Ms. Marshall reviewed staff comments with the Board. Mr. Ryan Henderson, Ingenium Enterprises , and Mr. Ben Pennington, architect, reviewed the project with the Board. Mr. Lambert asked about the legend and item #I. Mr. Henderson answered that they indicate the location of the tree wells. Mr. Lambert asked about the rooftop equipment and if it would be contained within the hipped roof. Mr. Pennington answered in the affirmative and stated that the hip roof would be on the front and a flat roof on the back. Mr. Kiel asked about the staff’s massing comment. Mr. Pennington answered that due to the required building frontage, the different sections were done to distinguish the different tenant spaces. Ms. Morrison suggested that the massing be simplified. Mr. Kiel agreed. Mr. Kiel noted that the property was previously a fueling station and asked if this was considered. Mr. Henderson answered in the affirmative. Mr. Kiel asked about drainage. Mr. Henderson answered that it is located to the rear of the property. Mr. Cave asked about moving the building to the right of the property. Mr . Henderson answered that the soil composition is more “loose” and would not be conducive to the foundation. Mr. Cave asked about traffic safety. Mr . Stone answered that staff has reviewed the traffic patterns. Mr. Cave asked if there are concerns with moving the building to the right. Mr . Stone answered that there are future intersection improvements planned. There being no comments, Mr. Cave closed public comment. Design Review Board August 26, 2026 Page 3 of 8 There were no additional Board comments. 2. Gather Master Plan – Revisions, 1601 Midtown Av, TMS # 559-00-00-017, Final Review of Site, Landscape, and Architecture Mr. Stone and Ms. Marshall reviewed staff comments with the Board. Mr. Noah Nelson, Earthsource Engineering, reviewed the request with the Board. Ms. Morrison asked if all parking requirements would be met. Mr. Nelson answered in the affirmative. There being no comments, Mr. Cave closed public comments. Ms. Morrison moved for approval including all staff comments. Mr. Kiel seconded the motion. All in favor. 3. Gather Phase Two – Revisions, 1601 Midtown Av, TMS # 559-00-00-017, Final Review of Site, Landscape, and Architecture Mr. Stone and Ms. Marshall reviewed staff comments with the Board. Mr. Todd Richardson, Synchronicity, reviewed the request with the Board. Mr. Kiel asked about noise. Mr. Richardson answered that the courts are surrounded by plexiglass and is played with a tennis ball, so the noise would be suppressed. Mr. Kiel asked about the lighting. Mr. Richardson answered that it is down lighting that keeps the lighting contained within the courts. Ms. Morrison asked if the tree has been relocated. Mr. Richardson answered in the affirmative and stated that it is thriving. Ms. Lisa Schnipke, 185 Mossy Oak Way, suggested that artificial turf and pervious surface is being used and asked that real grass be utilized. Mr. Lambert moved for approval. Mr. Kiel seconded the motion. All in favor. Design Review Board August 26, 2026 Page 4 of 8 4. Dominion Energy Shed Expansion – Revisions, 1277 Chuck Dawley Blvd, TMS # 560-01-00-002, Final Review of Site, Landscape, and Architecture Mr. Stone and Ms. Marshall reviewed staff comments with the Board. Mr. Zach Swalhah, Dominion Energy, and Mr. Alan Reinhart, arborist, reviewed the request with the Board. Mr. Sachs entered at this time (5:40 pm). Mr. Lambert moved for approval of submittal of an arborist report. Mr. Kiel seconded the motion. All in favor. Mr. Reinhart reviewed the arborist report with the Board. Mr. Lambert asked the size of the tree. Mr. Reinhart answered that it is an 80 inch diameter standard height (dsh) due to having six trunks. He stated that they have considered relocating the tree, but there are concerns with viability. Ms. Morrison asked if the mitigation proposed would meet the Town’s requirements. Mr. Stone answered that being a larger tree would mean additional mitigation required. Mr. Lambert asked the mitigation requirements. Mr. Stone answered it would be 50% mitigation. He stated that that the 160 inch tree canopy requirement would have to be met. Mr. Lambert suggested that planting five 5 inch trees would provide a good canopy and buffer. Mr. Kiel suggested that he is comfortable with removal of the tree as it is not a great tree. Mr. Sachs agreed that the tree appears to be in questionable condition and planting additional trees would be amenable. Mr. Cave stated that this is a reasonable compromise. Design Review Board August 26, 2026 Page 5 of 8 Mr. Kiel asked the distance of the tree from the proposed building. Mr . Swalhah answered that it is approximately 35 feet. He stated that they would need to disturb the soil from the proposed shed to the tree. There being no comments, Mr. Cave closed public comment. Mr. Lambert stated that he is comfortable with the removal of the tree and the suggested mitigation. Mr. Kiel moved for approval with the mitigation as proposed. Mr. Lambert seconded the motion. All in favor. 5. Construction Resources – Revisions, 1981 Riviera Dr, TMS # 561 -00-00- 134, Final Review of Site, Landscape, and Architecture This item was approved by consent. 6. Culver’s, 2128 Highway 41, TMS # 594-05-00-930, Preliminary Review of Site, Landscape, and Architecture Mr. Stone and Ms. Marshall reviewed staff comments with the Board. Mr. Charles Paisley, owner, stated that he is available for questions. Ms. Morrison asked if the applicant has reviewed staff comments. Mr. Paisley answered in the affirmative and stated that he agrees with the comments and will work to have them addressed. Mr. Lambert asked if the elevations would be revised to have the sloped roof. Mr. Paisley answered in the affirmative. Mr. Cave asked if the staff comments would be addressed. Mr. Paisley answered in the affirmative. Ms. Morrison asked about the left side elevation if the ladder would be at the rear. Mr. Paisley answered that this would be in the rear by the wetlands. Ms. Morrison suggested restudy of the proportion of the entry element with the gable. Mr. Paisley answered that this could be done. Design Review Board August 26, 2026 Page 6 of 8 There being no comments, Mr. Cave closed public comments. The Board had no further comments. 7. Wando Crossing Retail Building, 1501 North Highway 17 A, TMS # 559 - 14-00-042, Preliminary Review of Site, Landscape, and Architecture Mr. Stone and Ms. Marshall reviewed staff comments with the Board. Mr. Noah Nelson, Earthsource Engineering, and Losse Knight, LFK Architects, reviewed the request with the Board. Ms. Morrison stated that she is comfortable with the proposal. Mr. Kiel asked about screening for the dumpster, fuel tank, and roof equipment. Mr. Knight reviewed the screening with the Board and stated that they are open to comments. Mr. Cave agreed that it fits with the shopping center. Mr. Lambert agreed and stated that there is room for truck deliveries. There being no comments, Mr. Cave closed public comment. There were no additional Board comments. 8. Crate & Barrel and L.L. Bean, 1744 Towne Centre Way, TMS # 558-00-00- 096, Preliminary Review of Site, Landscape, and Architecture Mr. Stone and Ms. Marshall reviewed staff comments with the Board. Mr. Dan Schafer, LS3P , and Ms. Colleen Williams, SWA, reviewed the request with the Board. Mr. Kiel asked about the entry canopy for Crate and Barrell. Mr. Schafer answered that the existing pre-cast wall would be removed. Design Review Board August 26, 2026 Page 7 of 8 Mr. Lambert asked about the demolition. Mr. Schafer answered that it would be demolished t o the steel structure and supported while the new façade is constructed. There being no comments, Mr. Cave closed public comments. There were no additional comments from the Board. 9. Crooked Hammock – Revisions, 1010 Hungryneck Blvd, TMS # 559-00-00- 172, Preliminary Review of Site, Landscape, and Architecture Public Correspondence Mr. Stone and Ms. Marshall reviewed staff comments with the Board. Mr. Todd Richardson, Synchronicity, Mr. Noah Nelson, Earthsource Engineering, and Mr. Rob Sarle, Maurer Architects, reviewed the request with the Board. Mr. Kiel asked about the garage door on the rear. Mr. Sarle answered that it would be glazed and look like a store front. Mr. Kiel asked if it can be opened. Mr. Sarle answered in the affirmative. Mr. Kiel asked if it is raised. Mr. Sarle answered that it is a couple of feet above grade and would have a guard rail. Mr. Kiel asked about noise. Mr. Sarle answered that there should be minimal noise. Mr. Kiel asked about buffers. Mr. Sarle answered that there would be a six foot privacy fence in addition to landscaping. Mr. Kiel asked if there would be outside service. Mr. Starr answered in the affirmative with a patio and bar. Ms. Morrison asked about colors. Mr. Sarle answered that there would be contrast between the trim and main color. Mr. Cave suggested that the revisions would not change the us e of the space and impact to the surrounding area. Mr. Sarle asked if final approval could be given. Mr. Cave answered in the negative and stated that the request was not advertised as final approval. Mr. George Freeman, 2347 Hwy 17, reiterated his concern with the outdoor dining and outdoor music in relation to noise pollution. Design Review Board August 26, 2026 Page 8 of 8 Mr. Mike Tinkey, 208 Venning, reiterated the concern of noise pollution especially since this is adjacent to a residential neighborhood. He suggested there are a multitude of considerations such as position of lighting, speakers, buffers, etc. He suggested that merely meeting the ordinance standards might not be sufficient. He suggested that the buffer will need to be supplemented as well. There being additional comments, Mr. Cave closed public comment. Mr. Lambert suggested that the applicant should address the concerns expressed in the comments at this meeting in addition to staff comments. Mr. Cave asked if the applicant could comment on the outdoor music. Mr. Matt Cross, property owner, answered that the business is aware of the noise ordinance and will abide by those requirements. There were no additional Board comments. There being no further business, the meeting adjourned at 6:41 pm. Submitted by, L. Lynes DRB08262026

Source: Town of Mount Pleasant website. First collected Oct 13, 2026.