Planning Commission Packet (PDF)
Town of Bluffton · Beaufort County · meeting of May 26, 2021 · Agenda packets
Open the original document More from Town of Bluffton
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
.
Planning Commission
Wednesday, May 26, 2021 at 6:00 PM
Theodore D. Washington Municipal Building, 20 Bridge Street, Henry “Emmett” McCracken Jr.
Council Chambers
AGENDA
I. CALL TO ORDER
II. ROLL CALL
III. ADOPTION OF THE AGENDA
IV. ADOPTION OF MINUTES
1. April 28, 2021
V. PUBLIC COMMENTS FOR ITEMS NOT ON THE AGENDA*
VI. OLD BUSINESS
1. Belfair Towne Village (Certificate of Appropriateness – Highway Corridor Overlay District): A
request by Wallace Milling of Witmer Jones Keefer, Ltd, on behalf of David Carpio of Brixmor
for approval of a Certificate of Appropriateness – HCOD. The project consists of the removal of
trees located along the frontage buffer with US HWY 278. The Property is zoned Belfair
Planned Unit Development a located northeast of the intersection of US HWY 278 and
Simmonsville Road. (COFA–01-21-14930) (Staff- Will Howard)
VII. NEW BUSINESS
1. New Riverside Park (Street Naming Application): A request by Constance S. Clarkson on
behalf of the Town of Bluffton for approval of a street naming application to name the newly
constructed private drive that will serve Fire Station #31 and the Town of Bluffton New
Riverside Park. The property is zoned New Riverside Planned Unit Development and identified
by tax map number R610 036 000 1319 0000 located southwest of the intersection of Okatie
Highway and New Riverside Road. STR 05-21-00000) (Staff – Will Howard)
2. Parkers Kitchen – 5 Oliver Court (Preliminary Development Plan): A request by Drayton-Park
Companies, LLC on behalf of the owner, Wyatt Pringle, for the approval of a Preliminary
Development Plan. The project consists of the construction of a +/- 5,200 square foot
Page 1
Town of Bluffton, SC Planning Commission Agenda May 26, 2021
convenience store and fuel station. The property is zoned Schultz Planned Unit Development
and consists of approximately 1.88 acres identified by tax map number R610 031 000 0961
0000 located at 5 Oliver Court. (DP-02-21-015049) (Staff – Will Howard)
VIII. DISCUSSION
1. Comprehensive Plan Update
IX. ADJOURNMENT
“FOIA Compliance – Public notification of this meeting has been published and posted in compliance
with the Freedom of Information Act and the Town of Bluffton policies.”
In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"),
the Town of Bluffton will not discriminate against qualified individuals with disabilities on the basis of
disability in its services, programs, or activities. The Town of Bluffton Council Chambers are ADA
compatible. Any person requiring further accommodation should contact the Town of Bluffton ADA
Coordinator at 843.706.4500 or adacoordinator@townofbluffton.com as soon as possible but no later
than 48 hours before the scheduled event.
*Please note that each member of the public may speak at one public comment session and a form
must be filled out and given to the Town Clerk. Public comment must not exceed three (3) minutes.
Page 2
.
Planning Commission
Electronic Meeting
April 28, 2021
I. PUBLIC COMMENT
Public comments will be received via conference line provided by staff. All requests for public
hearing or public comment will be accepted up to two (2) hours prior to the scheduled meeting
start time.
II. CALL TO ORDER
III. ROLL CALL
ROLL CALL
PRESENT
Chairman Amanda Jackson Denmark
Commissioner Charlie Wetmore
Commissioner Kathleen Duncan
Commissioner Matthew Youst
Commissioner Ron Williams
Vice Chairman Terry Hannock
Commissioner Trey Griffin
IV. ADOPTION OF THE AGENDA
Motion made by Commissioner Hannock, Seconded by Commissioner Williams.
Voting Yea: Commissioner Jackson Denmark, Commissioner Wetmore, Commissioner Duncan,
Commissioner Youst, Commissioner Williams, Commissioner Hannock, Commissioner Griffin
V. ADOPTION OF MINUTES - March 24, 2021
Motion made by Vice Chairman Hannock, Seconded by Commissioner Griffin.
Voting Yea: Chairman Jackson Denmark, Commissioner Duncan, Commissioner Youst,
Commissioner Williams, Commissioner Hannock, Commissioner Griffin
Voting Abstaining: Commissioner Wetmore
VI. PUBLIC COMMENTS FOR ITEMS NOT ON THE AGENDA*
VII. EXECUTIVE SESSION
1. Receipt of legal advice related to the powers and duties of the Planning Commission and to
approval of Preliminary Development Plan pursuant to (SC FOIA 30-4-70(a)(2)).
Commissioner Williams voted to go into Executive Session at 6:07pm. Vice Chairman Hannock
seconded the motion. All were in favor and the motion passed.
Commissioner Wetmore voted to come out of Executive Session at 7:09pm. Vice Chairman
Hannock seconded the motion. All were in favor and the motion passed.
Page 3
Section IV. Item #1.
Town of Bluffton, SC Planning Commission Minutes April 28, 2021
VIII. OLD BUSINESS
1. Amend Order of March 24, 2021, Conditionally Approving May River Marketplace
(Preliminary Development Plan): Consideration of a motion to amend conditional approval of
the Preliminary Development Plan (DP-01-21-14870) for May River Marketplace, as adopted
on March 24, 2021, for the elimination of two of the conditions imposed by the Planning
Commission as a condition of approval. These two conditions to be eliminated are that the
Applicant (i) produce a “letter of support from the Woodbridge Property Owners Association”
and (ii) present the Final Development Plan to Planning Commission. The project involves a
commercial development located at 2 Parkside Drive and referred to as “May River
Marketplace and consists of the construction of a restaurant and retail space with an outdoor
pavilion, parking and infrastructure. The property is zoned Buckwalter Planned Unit
Development and consists of approximately 12.9 acres identified by tax map number R610
000 000 0000 0000. (Staff)
Commissioner Youst recused himself from this item.
Vice Chairman Hannock motioned to approve the application with the following conditions:
1. At the time of Final Development Plan, the Applicant shall provide the final sound analysis
report. Any additional recommendations provided in the final sound analysis. Any additional
recommendation provided in the final sound analysis shall be incorporated into the Final
Development Plan.
2. The Applicant shall coordinate construction efforts with Beaufort County Traffic Engineering
for all improvements required by the Traffic Signal Warrant Study and Encroachment Permit
for the access intersections with Buckwalter Parkway.
Commissioner Duncan seconded the motion. All were in favor and the motioned passed.
Vice Chairman Hannock stated that he has been concerned about the sound levels from the
entertainment aspect of this project. Hannock stated that the Commission has heard several
different things conflicting; how big the bands are going to be, a small group or an individual
with a guitar. Hannock hopes that staff will be able to get a better definition from the
Developer.
Chairman Jackson-Denmark asked Town Attorney, Richardson LaBruce, to explain why this
project is coming back before the Commissioner for the record. LaBurce exclaimed that the
Preliminary Development Plan that was considered at the March 24, 2021 Planning
Commission meeting, there were two conditions imposed as part of that Development Plan.
The first condition was the letter of support from the Woodbridge Property Owners
Association (POA). The second condition was regarding the presenting of Final Development
Plan to the Planning Commission. The second condition, by ordinance of the Town of Bluffton,
Final Development Plan approval are at the decision of the Unified Development Ordinance
(UDO) Administrator. Meaning, the Planning Commission does not have the authority to
impose that condition. Requiring that a third party provide a letter of support could
potentially create an issue from a legal standpoint.
Commissioner Wetmore then stated the he would still like to see the Final Development Plan
come back before the Planning Commission for comments and suggestions to the Unified
Page 4
Section IV. Item #1.
Town of Bluffton, SC Planning Commission Minutes April 28, 2021
Development Ordinance (UDO) Administrator. Wetmore then stated in agreeance with Vice
Chairman Hannock, this project has made some of the Planning Commission nervous. The
project itself may not be a bad thing but, we just want to make sure it is created as it has been
presented to us. Wetmore also stated that he knows the Unified Development Ordinance
(UDO)Administrator will appreciate more eyes on this for feedback purposes before a final
decision is made.
All were in favor of removing conditions 3 & 4 from the approval given at the last meeting of
the Planning Commission.
IX. NEW BUSINESS
1. Saint Gregory the Great (Initial Master Plan): A request submitted by Walter Nester of Burr,
Forman, McNair on behalf of the Bishop of Charleston and Beaufort Jasper Water and Sewer
Authority for Planning Commission Consideration, and Recommendation to Town Council for
approving an Initial Master Plan for Saint Georgy the Great, in the Buckwalter Planned Unit
Development Concept Plan and consists of approximately 61.093 Acres of land located at 323
Fording Island Road, Beaufort County Tax Map No. R600 022 000 0125 0000 and R600 022 000
1120 0000 subject to a new Saint Gregory the Great Land Use Tract to be established through
a Buckwalter Planned Unit Development Text Amendment (MP-02-20-14050) (Staff – Kevin
Icard)
Staff member Kevin Icard presented the information to the Commission which is incorporated
into these minutes.
Commissioner Youst recused himself from this item.
Commissioner Wetmore asked if the only change being brought before the Commission today
was a reduction in dwelling units. Staff member Icard confirmed the number of dwelling units
has been reduced from 250 units to 110 units.
Commissioner moved to recommend to Town Council to approve the Initial Master Plan for
St. Gregory the Great based on the review criteria presented in this report and as outlined in
Section 3.9.3 Application Review Criteria in the Unified Development Ordinance.
Motion made by Commissioner Hannock, Seconded by Commissioner Griffin.
Voting Yea: Commissioner Jackson Denmark, Commissioner Wetmore, Commissioner Duncan,
Commissioner Williams, Commissioner Hannock, Commissioner Griffin
Voting Abstaining: Commissioner Youst
2. Lighthouse Lagoon Miniature Golf (Preliminary Development Plan): A request by Ward
Edwards Engineering on behalf of Lighthouse Lagoon Miniature Golf, for approval of a
Preliminary Development Plan. The project consists of the construction of a miniature golf
course with associated infrastructure and parking. The property zoned Buckwalter Planned
Unit Development and identified by tax map number R610 030 000 2001 0000 located at 24
Innovation Drive. (DP-01-21-014882) (Staff- Will Howard)
Page 5
Section IV. Item #1.
Town of Bluffton, SC Planning Commission Minutes April 28, 2021
Staff member Will Howard presented the information to the Commission which is
incorporated into these minutes.
Commissioner Wetmore voiced his concerned about patrons having to do a U-turn in order to
park at the establishment. Wetmore stated that with the amount of traffic that is on that
access road we would be setting ourselves up for a traffic nightmare unless that parking lot
has a straight entrance into it. Chairman Jackson-Denmark stated that she is also concerned
with the "dead end" parking.
Motion made by Commissioner Wetmore, Seconded by Commissioner Hannock.
Voting Yea: Commissioner Jackson Denmark, Commissioner Wetmore, Commissioner Duncan,
Commissioner Youst, Commissioner Williams, Commissioner Hannock, Commissioner Griffin
X. DISCUSSION
1. Historic Preservation Month (May)
Staff member Kevin Icard let the Commission know that May is Historic Preservation Month.
2. Town of Bluffton Historic Preservation Symposium- May 27, 2021
Staff member Kevin Icard stated the to celebrate a small portion of the history of Bluffton, the
Town will be holding it's sixth annual Historic Preservation Symposium. Icard also noted that
seating will be limited due to COVID-19 and an RSVP is required.
XI. ADJOURNMENT
ADJOURNMENT
Commissioner Wetmore motioned to adjourn the April 28, 2021 meeting of the Planning
Commission. Vice Chairman Hannock seconded the motion. All were in favor and the motion
passed.
Page 6
Section IV. Item #1.
PLANNING COMMISSION
STAFF REPORT
Department of Growth Management
MEETING DATE: May 26, 2021
PROJECT: Belfair Town Village – Certificate of Appropriateness –
Highway Corridor Overlay (COFA-HCO)
APPLICANT: Wallace Milling of Witmer Jones Keefer, Ltd
PROJECT NUMBER: COFA-01-21-014930
PROJECT MANAGER: Will Howard
Principal Planner – Land Development
REQUEST: The Applicant, Wallace Milling of Witmer Jones Keefer, Ltd, on behalf of the
owner, David Carpio, Brixmor, requests that the Planning Commission approve the
following application:
1. COFA-01-21-014930. A Certificate of Appropriateness for the approval of the
removal of trees located along the frontage buffer with US 278, and zoned Belfair
PUD. (Attachment 1)
APPLICATION UPDATE: The application was originally presented at the Jan 27, 2021
meeting of the Planning Commission. The Planning Commission voted to “Table” the
application until additional information could be provided, requesting specifically that the
applicant provide and arborist’s assessment and tree mitigation plan for the trees
proposed for removal.
An arborist’s assessment has been provided, recommending the removal of thirty-five
(35) trees. Criteria considered for removal included tree species, tree structure, tree
health and consequence of failure.
A tree mitigation plan and corresponding plant schedule was also provided for review.
The applicant is proposing a mix of Live Oaks, Sabal Palmettos, Fringe Trees and
Yaupon Holly to mitigate the trees removed and provide buffering of the parking area
as required in Section 4.23.2.1.C.7. of the Beaufort County 1990/3 Zoning and
Development Standards Ordinance.
INTRODUCTION: On July 24, 1995, Beaufort County Council approved a request for
rezoning to a PUD District for 1,028 acres, located north of US 278, establishing the
Belfair Planned Unit Development Zoning District. The majority of the development
was approved for low intensity single family residential, with 33 acres approved for
multifamily, and fifty acres for commercial development. (Attachment 2)
As part of the Buck Island Simmonsville Annexation of 2005, the commercial portion of
the Belfair PUD was annexed into the Town of Bluffton and the Belfair PUD, as approved
Page 7
Section VI. Item #1.
May 26, 2021 Page 2
Belfair Town Village – Certificate of Appropriateness – HCO Planning Commission
by Beaufort County, was adopted by the Town of Bluffton as the official zoning for the
property. (Attachment 3)
The Applicant has provided a tree removal plan and is requesting approval of a
Certificate of Appropriateness – Highway Corridor Overlay (HCO) application for the
alteration of the existing landscape plan to remove trees along the frontage buffer with
US 278. (Attachments 4 & 5)
Being located along and visible from US 278, this property is located in the Highway
Corridor Overlay and is subject to review by the Planning Commission. The Commission
has review authority over the architectural, landscaping, and lighting design only. In
this application, only the landscape design is being proposed for modification.
(Attachment 6)
BACKGROUND: This application is for a Certificate of Appropriateness-Highway Corridor
Overlay located within the Belfair PUD and is subject to the standards set forth in the
Belfair PUD Concept Plan and the Belfair PUD Master Plan. The project consists of the
removal of several trees adjacent to, not within, the highway buffer along the frontage
with US 278. (Attachment 3)
REVIEW CRITERIA & ANALYSIS: Town Staff and the Planning Commission are required
to consider the criteria set forth in Section 3.17.3 of the Unified Development
Ordinance in assessing an application for a Certificate of Appropriateness- HCO. These
criteria are provided below followed by a Staff Finding based upon review of the
application submittals to date.
1. Section 3.17.3.A. The proposed development must be in conformance with
applicable landscaping, lighting, and architectural provisions provided in Article 5,
Design Standards.
Finding. The project is located in the Belfair PUD. There are specific design
standards established by the PUD and the Beaufort County 1990/3 Zoning and
Development Standards Ordinance (ZDSO), which are attached to the PUD. As a
result, Article 5 of the current Unified Development Ordinance does not apply to
this proposal.
2. Section 3.17.3.B. The proposed development shall be in conformance with any
approved Development Agreement, PUD Concept Plan, PUD Master Plan,
Subdivision Plan, or any other agreements or plans that are applicable.
The property is located in the Belfair PUD and the Belfair PUD Master Plan. As a
result and as previously noted, the property is subject to the Beaufort County
1990/3 Zoning and Development Standards Ordinance. This Zoning and
Development Standards Ordinance contains architectural, landscaping, and
lighting design standards for properties located in the Highway Corridor Overlay
District. As previously noted, only the landscaping design is being proposed for
modification in this application; therefore, the architectural standards are not
applicable.
i. Finding - Landscape Design. Section 4.23.2.1.C. of the Beaufort County
1990/3 Zoning and Development Standards Ordinance states that the
Page 8
Section VI. Item #1.
May 26, 2021 Page 3
Belfair Town Village – Certificate of Appropriateness – HCO Planning Commission
purpose of this subsection is to achieve at maturity a semi-continuous and
semi-opaque vertical plane of tree canopy, understory trees and shrubbery
coverage in order to soften the appearance of structures and parking lots
visible from the highway, to screen headlight glare of and off site, and to
mitigate commercial lighting as seen by neighboring properties and from the
highway. Natural appearing landscape forms are encouraged.
Staff finds that the proposed tree removal would significantly impact the
buffer and would be in direct contrast to the intent of the above referenced
section.
ii. Finding - Landscape Design. Section 4.23.2.1.C.7. of the Beaufort County
1990/3 Zoning and Development Standards Ordinance states where
commercial parking areas would be visible from the highway, additional
vegetation, walls, fences, berms, or some combination shall be used to
screen those areas.
Staff finds that the existing buffer exceeds the minimum requirement and
was designed in order to satisfactorily screen the parking area from the
highway.
iii. Finding - Landscape Design. Section 4.23.2.1.C.8. of the Beaufort County
1990/3 Zoning and Development Standards Ordinance states that trees and
shrubs shall not be pruned in any manner that would significantly diminish
the desired softening character of the buffer except in accordance with
standard horticultural practice. Trees shall not be limbed-up from the
ground more than six (6’) feet to the lowest branches except as required
within sight triangles at intersections or to provide adequate light for
understory plantings.
Updated Finding - Staff finds that the proposed mitigation plan will provide
sufficient screening and buffering of the parking areas to satisfactorily
screen the parking area following tree removal.
3. Section 3.17.3.C. The application must comply with applicable requirements in
the Application Manual.
a. Finding. The application has been reviewed by Town Staff and has been
determined to be complete.
PLANNING COMMISSION ACTION: As granted by the powers and duties set forth in
Section 2.2.6.C. of the Unified Development Ordinance, the Planning Commission has
the authority to take the following actions with respect to this application:
1. Approve the application as submitted by the Applicant;
2. Approve the application with conditions; or
3. Deny the application as submitted by the Applicant.
County 1990/3 Zoning and Development Standards Ordinance , as approved as an
attachment to the Belfair PUD Concept Plan.
Page 9
Section VI. Item #1.
May 26, 2021 Page 4
Belfair Town Village – Certificate of Appropriateness – HCO Planning Commission
ATTACHMENTS:
1. Application & Narrative
2. Zoning Map
3. Vicinity Map
4. Tree Removal Plan
5. Aerial Map
6. Highway Corridor Overlay Map
7. Arborist’s assessment
8. Tree mitigation plan
Page 10
Section VI. Item #1.
TOWN OF BLUFFTON
TREE REMOVAL APPLICATION
Town of Bluffton Tree Removal Application Updated: 07/28/2014
Growth Management Customer Service Center
20 Bridge Street
Bluffton, SC 29910
(843) 706-4522
www.townofbluffton.sc.gov
applicationfeedback@townofbluffton.com
Applicant Property Owner
Name: Name:
Phone: Phone:
Mailing Address: Mailing Address:
E-mail: E-mail:
Town Business License # (if applicable):
Project Information
Project Address:
Project Location:
Zoning District: Acreage:
Tax Map Number(s):
Tree Species and Diameter:
Location of Tree to be Removed (flag tree in field prior to submitting):
Reason for Tree Removal:
Minimum Requirements for Submittal
1. Project Narrative describing reason for application and compliance with the criteria in Article 3 of the UDO.
2. An Application Review Fee as determined by the Town of Bluffton Master Fee Schedule. Checks made payable
to the Town of Bluffton.
3. A tree survey/site plan indicating type and size of existing trees and those to be removed.
4. A mitigation plan demonstrating compliance with applicable tree replacement standards.
Disclaimer: The Town of Bluffton assumes no legal or financial liability to the applicant or any
third party whatsoever by approving the plans associated with this permit.
I hereby acknowledge by my signature below that the foregoing application is complete and accurate and that I am
the owner of the subject property. As applicable, I authorize the subject property to be posted and inspected.
Property Owner Signature: Date:
Applicant Signature: Date:
For Office Use
Application Number: Date Received:
Received By: Date Approved:
23 Promende Street Suite 201
Bluffton, SC 29910
wallace@wjkltd.com
Site Improvements; Removing Dead and/or Hazardous trees
63-145 Towne Drive, Bluffton, SC 29910
Belfair Towne Village
Belfiar PUD
R610 031 000 0194 0000
±10 acres
See Plans
See Plans
David.Carpio@brixmor.com
David Carpio, BrixmorWallace Milling, Witmer Jones Keefer, Ltd.
Attachment 1
843-757-7411 770-360-8422
Page 11
Section VI. Item #1.
TOWN OF BLUFFTON
TREE REMOVAL APPLICATION
PROCESS NARRATIVE
Town of Bluffton Tree Removal Application Effective Date: 07/28/2014
The following Process Narrative is intended to provide Applicants with an understanding of the respective application process,
procedures and Unified Development Ordinance (UDO) requirements for obtaining application approval in the Town of Bluffton. While
intended to explain the process, it is not intended to repeal, eliminate or otherwise limit any requirements, regulations or provisions of
the Town of Bluffton’s UDO. Compliance with these procedures will minimize delays and assure expeditious application review.
Step 1. Application Submittal Applicant
The Applicant shall submit the Tree Removal Application and required submittal materials.
Step 2. Review by UDO Administrator Staff
If the UDO Administrator determines that the Tree Removal Application is complete, it shall be reviewed for compliance with the
criteria and provisions in the UDO. The UDO Administrator may approve, approve with conditions, or deny the application.
Step 3. Issue Tree Removal Permit Staff
If Tree Removal Application is in compliance with the criteria and provisions in the UDO, the UDO Administrator shall issue the Tree
Removal Permit.
Attachment 1
Page 12
Section VI. Item #1.
23 Promenade Street, Suite 201
Bluffton, SC 29910
Tel: 843-757-7411
November 10, 2020
Will Howard
Town of Bluffton
RE: Belfair Towne Village tree removal narrative
Dear Mr. Howard,
On behalf of the applicant, we are submitting the attached HC COA for Belfair Towne Village.
The proposed work consists of removing a variety of trees along the Highway 278 Frontage of the
property, including Pine, Laurel oak, Gum, Hickorys and some Water oak species. The trees
proposed to be removed are NOT specimen trees and are not part of the 25’ Highway Corridor
Overlay buffer requirement. There are a total of 56 trees proposed to be removed while there are
115 overstory trees to remain which more than meets to buffer requirement. The Understory
vegetation will largely remain except for vines and invasive species and will be maintained to block
views to parking. We believe there will still be ample buffer vegetation to screen the Belfair Town
Village shopping center which recently improved its landscape by adding 42 Live Oak Trees and 97
Palmetto Trees among many other ornamental landscape plantings that soften the development
from Hwy 278.
If you require additional submittal documents, please contact me.
Sincerely,
WitmerwJoneswKeefer, Ltd.
Wallace Milling, Principal
Attachment 1
Page 13
Section VI. Item #1.
Zoning
Map
Attachment 2
Page 14
Section VI. Item #1.
Vicinity Map
Attachment 3
Page 15
Section VI. Item #1.
±720' ± 200'
KEY SHEET
L100
PRELIMINARY
SUBMITTAL PLAN,
NOT FOR
CONSTRUCTION
SITE DEVELOPMENT PLANS
FOR
BELFAIR TOWNE VILLAGE
BLUFFTON, SOUTH CAROLINA
DRAWING NUMBER
DRAWING TITLE
DESIGN CONCEPTS, DRAWING, SHEETS,
LOGOS, SPECIFICATIONS, DETAILS,
WRITTEN MATERIAL SHALL NOT BE USED
OR REPRODUCED IN WHOLE OR IN PART
IN ANY FORM WITHOUT PRIOR WRITTEN
CONSENT OF WJK LTD.
© 2020 WJK LTD.
THIS SHEET TO SCALE AT: 24"X36"
DATE:
PROJECT NO.:
DRAWN BY:
CHECKED BY:
Nov. 10, 2020
17120.01
WM
WM
REVISIONS:
04080120160
2060100140
Scale 1 " = 40'
c
N
E
W
WENDY'S
SOUTH
STATE
BANK
TO
HWY 170TO HHI HWY 278 - WILLIAM HILTON PARKWAY
RIGHT OF WAY/ PROPERTY LINE
BELFAIR VILLAGE DR.
OAK FOREST RD.
BUFFER REFINEMENT ZONE NOTES:
TOTAL BUFFER LINEAR FOOTAGE = 920
-REMOVE ALL THE FOLLOWING TREE SPECIES UNDER 6" CALIPER AT 4'
"BREAST HEIGHT".
-WATER OAK
-LAUREL OAK
-LOBLOLLY PINE
-PIGNUT HICKORY
-GUM
-PRESERVE ALL GROUPINGS OF MATURE NATIVE SHRUBS SUCH AS
WAX MYRTLE, BAY, ANISE, YAUPON, AND PALMETTO WITHIN THE 25'
BUFFER SETBACK AND PRUNE DOWN TO A HEIGHT OF NO MORE
THAN 4' TALL.
-PRUNE ALL REMAINING OVERSTORY TREES TO A HEIGHT NO LESS
THAN 6' FROM FINISHED GRADE
-THE FOLLOWING MINIMUM QUANTITY OF BUFFER VEGETATION
SHALL REMAIN WITHIN THE +/- 850 LF REFINEMENT ZONE:
-6 OVERSTORY TREES/ 100 LF = 56 TOTAL (SEE CHART 1.L1)
-7 UNDERSTORY TREES/ 100 LF = 65 TOTAL
-30 SHRUBS/ 100 LF = 276 TOTAL
25' BUFFER
-REMOVE ALL NON SPECIMEN TREES LISTED IN CHART
2.L1
-REMOVE ALL TREE SPECIES UNDER 6" CALIPER AT 4'
"BREAST HEIGHT".
-WATER OAK
-LAUREL OAK
-LOBLOLLY PINE
-PIGNUT HICKORY
-GUM
UNDERBRUSH AND BUSH HOG UNDERSTORY
VEGETATION AND APPLY MULCH AND OR SOD/ SEED.
-PRUNE ALL REMAINING OVERSTORY TREES TO A
HEIGHT NO LESS THAN 15' FROM FINISHED GRADE
NON-BUFFER REFINEMENT ZONE NOTES:
25' BUFFER
BROAD-LEAF OVERSTORY TREE, TYP.
CONE-BEARING OVERSTORY TREE, TYP.
(3=1 BROAD-LEAF TREE)
7 OVERSTORY TREES 6 OVERSTORY TREES 8 OVERSTORY TREES 11 OVERSTORY TREES 10 OVERSTORY TREES 14 OVERSTORY TREES 8 OVERSTORY TREES 8 OVERSTORY TREES 10 OVERSTORY TREES
100' INTERVAL, TYP.
TREE TO BE REMOVED, TYP.
CHART 2.L1
CHART 1.L1
Attachment 4
Page 16
Section VI. Item #1.
Aerial Map
Attachment 5
Page 17
Section VI. Item #1.
Highway Corridor
Overlay
Attachment 6
Page 18
Section VI. Item #1.
Ossabaw Consulting, LLC
P.O. Box 30012 ▪ Savannah, GA 31410 ▪ ossabawconsulting@gmail.com ▪ (912) 658 8833
Arborist Site Report
Witmer-Jones-Keefer March 14, 2021
23Promenade Street, Ste. 201
Bluffton, SC 29910
Location:
Belfair Towne Center
Bluffton, SC
General Information:
The tree with the buffer area in front of the location were assessed to determine if
removal is recommended. Criteria considered for removal included by was not limited to, tree
species, tree structure, tree health, target, and consequence of failure. The trees were inspected
on March 8, 2021 at a Level 2 Assessment, as defined by the International Society of
Arboriculture (ISA).
Detailed Findings and Recommendations*:
The following trees should be considered for removal and criteria for removal has been
provided:
• Tree No. 1: 10-inch Slash Pine, this tree has poor growth structure.
• Tree No. 2: 19-inch Slash Pine, this tree has included bark
• Tree No. 3: 15-inch Slash Pine, this tree has a canker.
• Tree No.4: 6-inch Sweetgum, this tree has poor growth structure and included bark.
• Tree No. 5: 9-inch Slash Pine, this tree has poor growth structure and removal of this tree
will enhance the adjacent Laurel Oak and Sweetgum.
• Tree No. 6: 16-inch Slash Pine, this tree has a lean and a twisted trunk.
• Tree No. 7: 10-inch Slash Pine, this tree has poor growth structure and removal will
enhance adjacent Southern Magnolia and Laurel Oak.
Attachment 7
Page 19
Section VI. Item #1.
• Tree No. 8: 15-inch Slash Pine, removal of this tree will enhance the adjacent Laurel
Oak.
• Tree No. 9: 9-inch Laurel Oak, this tree is rubbing against another.
• Tree No. 10: 6-inch Hickory, this tree has poor growth structure.
• Tree No. 11: 9-inch Laurel Oak, this tree has poor growth structure and is leaning.
• Tree No.12: 16-inch Slash Pine, this tree has a canker on the trunk.
• Tree No. 13: 7-inch Sweetgum, this tree has poor growth structure.
• Tree No. 14: 8-inch Slash Pine, this tree has poor growth structure.
• Tree No. 15: 8-inch Sweetgum, this tree has poor growth structure.
• Tree No. 16: 3-inch Laurel Oak, removal of this tree will enhance adjacent Laurel Oak.
• Tree No. 17: 20-inch Slash Pine, this tree has a canker on the trunk.
• Tree No. 18: multi-stem Laurel Oak, marked stems are decayed.
• Tree No. 19: 12-inch Laurel Oak, this tree is decayed.
• Tree No. 20: Laurel Oak, this tree is dead.
• Tree No. 21: 10-inch Laurel Oak, this tree has a prominent lean.
• Tree No. 22: 9-inch Slash Pine, this tree has poor growth structure.
• Tree. No. 23: 8-inch Slash Pine, this tree is dead.
• Tree No. 24: 13-inch Laurel Oak, this tree is decayed.
• Tree No. 25: 13-inch Water Oak, this tree is decayed.
• Tree No. 26: 13-inch Water Oak, this tree is decayed.
• Tree No. 27: 12-inch Slash Pine, 13-inch Water Oak, this tree is decayed, and removal of
this tree will enhance adjacent Live Oak.
• Tree No. 28: 16-inch Slash Pine, this tree has poor growth structure and removal of this
tree will enhance adjacent Live Oak.
• Tree No. 29: 21-inch Laurel Oak, this tree has included bark and mistletoe.
• Tree No. 30: 12-inch Slash Pine, this tree has poor growth structure and a lean.
• Tree No 31: 12-inch Water Oak, this tree is decayed.
• Tree No. 32: 17-inch Slash Pine, this tree has a lean
• Tree No. 33: 7/8/8-inch Laurel Oak, this tree has poor growth structure and is decayed.
• Tree No. 34: 11-inch Bay, this tree has a canker on the trunk.
• Tree No. 35: 20-inch Water Oak, this tree has included bark.
To compensate for any loss of canopy on the property, the property owner is encouraged
to replant site appropriate trees. All trees that remain on site should be pruned to eliminate any
hazardous limbs, improve overall safety and development tree structure. Pruning should be
conducted under the supervision of an ISA Certified Arborist and should adhere to the most
recent ANSI A300 standards and ISA Best Management Practices for tree pruning. It is also
recommended that all remain be inspected annually by an ISA Certified Arborist to ensure the
health and stability of the trees.
Attachment 7
Page 20
Section VI. Item #1.
Arborist’s information:
Michael W. Pavlis, BS, MS
ISA Certified Arborist, SO-5588A
ISA Tree Risk Qualification
Thank you for your consideration and business,
Michael W. Pavlis
Ossabaw Consulting, LLC
*Trees are a living organism and are undergoing constant change. Recommendations are based on current and ideal conditions. These conditions
may change as time progresses. While we strive for complete diagnosis there some defects that are not visible and failure of in or of a tree may
occur, unless otherwise stated by Ossabaw Consulting, LLC.
Attachment 7
Page 21
Section VI. Item #1.
Attachment 7
Page 22
Section VI. Item #1.
Attachment 7
Page 23
Section VI. Item #1.
Attachment 7
Page 24
Section VI. Item #1.
Attachment 8
Page 25
Section VI. Item #1.
PLANNING COMMISSION
STAFF REPORT
DEPARTMENT OF GROWTH MANAGEMENT
MEETING DATE: May 26, 2021
PROJECT:
STR 05-21-15356 New Riverside Park - New Street
Name Application
PROJECT MANAGER: Will Howard – Principal Planner
REQUEST: A request by Constance S. Clarkson on behalf of the Town of Bluffton
for approval of a Street Naming Application for the newly constructed driveway that
will provide access to the New Riverside Park and the New Riverside Fire Station-
# 31.
INTRODUCTION: The Applicant is requesting approval of the following new street
name:
1. Red Barn Drive
BACKGROUND: This application is for approval of approval of new street name for
newly constructed private driveway that will provide access to the New Riverside
Park and the New Riverside Fire Station # 31. The property is zoned New
Riverside Planned Unit Development and identified by tax map number R610 036
000 1319 0000 located southwest of the intersection of SC HWY 170 (Okatie
Highway) and SC HWY 46 (May River Road)
PLANNING COMMISSION ACTIONS: As granted by the powers and duties set forth
in Section 2.2.6.C.5 of the Unified Development Ordinance, the Planning
Commission has the authority to take the following actions with respect to this
application:
1. Approve the application as submitted by the Applicant;
2. Approve the application with conditions; or
3. Deny the application as submitted by the Applicant.
REVIEW CRITERIA & ANALYSIS: Town Staff and the Planning Commission are
required to consider the criteria set forth in Section 3.15.3 of the Unified
Development Ordinance in assessing an application for the New Street
Page 26
Section VII. Item #1.
May 26, 2021 Planning Commission
New Riverside Park Street Naming
Name. These criteria are provided below followed by a Staff Finding(s) based upon
review of the application submittals to date.
1. Section 3.15.3.A Does not already exist within Beaufort County;
2. Section 3.15.3.B Are not street types with the same primary name, such as
Smith Street and Smith Boulevard;
3. Section 3.15.3.C Are not name(s) which sound alike or which might be
confused with one another;
4. Section 3.15.3.D Does not use frivolous or complicated words, or
unconventional spellings;
5. Section 3.15.3.E Are not numbers (such as 1st Street) or alphabetical letters
(such as A Street);
6. Section 3.15.3.F Could not be perceived as offensive;
7. Section 3.15.3.G Are simple, logical, easy to pronounce, clear and brief;
8. Section 3.15.3.H Are associated with the history of Bluffton or the character
of the Lowcountry when possible;
9. Section 3.15.3.I May represent a common theme within residential
developments; and
10.Section 3.15.3.J The application must comply with applicable requirements
in the Applications Manual.
Finding. Town Staff finds that the proposed new street name is acceptable and
meets the requirements of Article 3 of the Unified Development Ordinance as stated
above.
STAFF RECOMMENDATION: Staff recommends that the Planning Commission
approve the New Street Name application as submitted by the Applicant.
ATTACHMENTS:
1. New Street Name Application
2. Site Plan
Page 27
Section VII. Item #1.
Page 28
Section VII. Item #1.
Page 29
Section VII. Item #1.
N/FNEW RIVER SIDE LLC
N/FNEW RIVERSIDE ASSOC INC
N/FNEW RIVER SIDE LLC
N/FNEW RIVER SIDE LLC
NEW RIVERSIDE ROAD R/W VARIES
N/FNEW RIVERSIDE ASSOC INC
PARCEL 4A-3
PARCEL 4A-3
PARCEL 4A-3
WETLANDS
WETLAND BUFFER
WETLAND BUFFER
NEW RIVERSIDE ROAD R/WVARIES
C401
SITE LAYOUT PLAN
PROJECT #:
DESIGNED BY:
DATE:
NO. DESCRIPTION DATE
IF THIS SHEET IS LESS THAN 22" X 34" IT IS A REDUCED PRINT, SCALE ACCORDINGLY
PLAN REVISIONS
7
6
5
4
3
2
1
SHEET
CHECKED BY:
this document and all reproducible copies of this document are the property of ward edwards, inc. reproduction or alterations of this drawing without the written consent of ward edwards, inc. is not permitted.
170267B
03/25/20
BCB
PRM
NEW RIVER PUD FIRE & EMS STATION
TOWN OF BLUFFTON, SOUTH CAROLINA
FRASER CONSTRUCTION COMPANY
BLUFFTON, SOUTH CAROLINA
P.O. BOX 381, BLUFFTON, SOUTH CAROLINA 29910
PH (843) 837-5250 / FAX (843) 837-2558
WWW.WARDEDWARDS.COM
VERTICAL DATUM:
NGVD29
03/25/20
NOT FOR CONSTRUCTION
30
60300
Feet
Page 30
Section VII. Item #1.
Preliminary Development Plan – Parker’s Planning Commission
PLANNING COMMISSION
STAFF REPORT
Department of Growth Management
MEETING DATE: May 26, 2021
PROJECT: Parker’s Kitchen #91
APPLICANT: Drayton-Parker Companies, LLC
PROJECT NUMBER: DP-02-21-015049
PROJECT MANAGER:
Will Howard
Principal Planner – Land Development
REQUEST: A request by Drayton-Parker Companies, LLC, for approval of a Preliminary
Development Plan. The project consists of the construction of a 5,214 square foot
convenience store with six (6) fuel dispensers with associated parking and
infrastructure (See Attachments 1 and 2 ).
INTRODUCTION: The property is zoned Shultz Tract Planned Unit Development
(PUD) within Bluffton Park Business Park designated area of the Bluffton Park Tracts
B, C & D Master Plan and identified by tax map number R610 031 000 0961 0000
consisting of approximately 1. 88 acres located at 5 Oliver Court (See Attachment
3).
BACKGROUND: This application is for a Preliminary Development Plan within the Shultz
Tract PUD and is subject to the design standards set forth in the Shultz Tract
Development Agreement, Concept Plan and Bluffton Park Tracts B, C and D Master Plan.
The Applicant is proposing the construction of a 5,214 square foot convenience store and
six (6) fuel dispensers with associated parking and infrastructure. Access to the proposed
site will be from two access drives off Oliver Court. The southern access is a right-out
only, while the northern access point is full access. Thirty-nine (39) parking spaces are
provided to satisfy the parking requirement of the Shultz Tract PUD (See Attachment 4).
Conceptual landscape and lighting plans have also been provided (See Attachments
5 & 6). The final plans will be reviewed against the Bluffton Park Design Guidelines
at time of Final Development Plan submittal.
The Development Review Committee (DRC) re quested revisions to the Preliminary
Development Plan at its April 7, 2021 meeting (See Attachment 7).
REVIEW CRITERIA & ANALYSIS: The Planning Commission shall consider the criteria
set forth in Section 3.10.3.A of the Unified Development Ordinance in assessing an
application for a Preliminary Development Plan. The applicable criteria are provided
Page 31
Section VII. Item #2.
May 26, 2021 Page 2
Preliminary Development Plan – Parker’s Planning Commission
below followed by Staff Finding(s) based upon review of the application submittals to
date.
1. Section 3.10.3.A.1. Conformance with the applicable provisions provided in
Article 5, Design Standards.
Finding. The project lies within the Shultz Tract PUD and is not subject to the
design standards found in the Unified Development Ordinance (UDO).
2. Section 3.10.3.A.2. The proposed development shall be in conformance with
any approved Development Agreement, PUD Concept Plan, PUD Master Plan,
Subdivision Plan, or any other agreements or plans that are applicable.
Finding: The proposed development lies within the Shultz Tract PUD and the
Business Park designated area of the Bluffton Park Tracts B, C & D Master Plan.
The Business Park area is designated for approximately 200 acres of commercial
development. In Section VI. Architectural Controls of the approved Master Plan
it states, “Owner agrees to use its best efforts to coordinate its planning and its
building designs to reflect and complement the character of Bluffton, and to
work with the Town to preserve that character.”
3. Section 3.10.3.A.3. If the proposed development is associated with a previously
approved Master Plan, then the traffic and access plans shall ad here to the
previously approved traffic impact analysis or assessment, where applicable. If
an application is not associated with a previously approved PUD Master Plan,
then a traffic impact analysis shall be required at development plan submittal.
Finding: A Traffic Impact Analysis was included with the Shultz Tract PUD
Development Agreement as well as the Bluffton Park Tracts B, C and D Master
Plan. Additionally, the Applicant submitted their own Traffic Impact Analysis.
The proposed plans were sent to the Beaufort County Traffic Engineer with a
request for comment and no comments were provided , despite multiple
attempts to request feedback . The property is located at the intersection of
Bluffton Parkway and Oliver Court which is an existing full access intersection
(unsignalized).
Finding: The Applicant submitted a Traffic Impact Analysis (Attachment 8) which
analyzed the Bluffton Parkway/Oliver Court intersection and found that the
current level of service is “F”. The same analysis states that “queues from the
unsignalized intersection of Bluffton Parkway at Oliver Court will extend
past/across the southern access and will likely result in vehicles stacked within
the site waiting to make the right -turn onto Oliver Court towards the Bluffton
Parkway”. The Traffic Impact Analysis also states that the signalization of Oliver
Court and Bluffton Parkway is not probable given that it does not meet federal
signal minimum requirements and does not correlate with the Bluffton Parkway
signalization plan to maintain the efficiency of the corridor.
Page 32
Section VII. Item #2.
May 26, 2021 Page 3
Preliminary Development Plan – Parker’s Planning Commission
4. Section 3.10.3.A.4. The proposed development must be able to be serv ed by
adequate public services, including, but not limited to, water, sanitary sewer,
roads, police, fire, and school services. For developments that have the potential
for significant impact on infrastructure and services, the applicant shall be
required to provide an analysis and mitigation of the impact on transportation,
utilities, and community services.
Finding: The Applicant has noted that the required utilities including electrical,
telephone, water and sewer are available to the site. Letters from the agencies
providing these services will be required at time of Final Development Plan
submittal per the Applications Manual.
5. Section 3.10.3.A.5. The phasing plan, if applicable, is logical and is designed in
a manner that allows each phase to fully fun ction independently regarding
services, utilities, circulation, facilities, and open space, irrespective of the
completion of other proposed phases.
Finding: The proposed development will be completed as a single phase.
6. Section 3.10.3.A.6. The application must comply with applicable requirements in
the Applications Manual.
Finding: The application has been reviewed by Town Staff and has been
determined to be complete.
PLANNING COMMISSION ACTION : The Planning Commission has the authority to
take the following actions with respect to the recommendation of the application to
the UDO Administrator:
1. Approve the application as submitted;
2. Approve the application with conditions;
3. Table the application; or
4. Deny the application as submitted.
NEXT STEPS:
1. If approved, the applicant will submit their stormwater plans to Watershed
Management for MS4 approval.
2. The applicant must submit their landscape, lighting, and architectural plans
to the Bluffton Park Commercial POA and provide proof of approval upon
submitting for Final Development Plan. Plans will be in com pliance with the
Bluffton Park Design Guidelines.
3. Applicant may submit for Final Development Plan once approval is obtained
from Watershed Management for the MS4 review and the Bluffton Park
Commercial POA.
4. Upon issuance of approval for the Final Development Plan, the applicant may
schedule a Pre -Construction Meeting and start construction.
Page 33
Section VII. Item #2.
May 26, 2021 Page 4
Preliminary Development Plan – Parker’s Planning Commission
ATTACHMENTS:
1. Application
2. Project Narrative
3. Vicinity Map
4. Site Plan
5. Landscape Plan
6. Lighting Plan
7. DRC Comments
8. Traffic Impact Analysis
Page 34
Section VII. Item #2.
Attachment 1
Page 35
Section VII. Item #2.
TOWN OF BLUFFTON
DEVELOPMENT PLAN APPLICATION
PROCESS NARRATIVE
Town of Bluffton Development Plan Application Effective Date: 07/28/2014
The following Process Narrative is intended to provide Applicants with an understanding of the respective application process,
procedures and Unified Development Ordinance (UDO) requirements for obtaining application approval in the Town of Bluffton. While
intended to explain the process, it is not intended to repeal, eliminate or otherwise limit any requirements, regulations or provisions of
the Town of Bluffton’s UDO. Compliance with these procedures will minimize delays and assure expeditious application review.
Step 1. Pre-Application Meeting Applicant & Staff
Prior to the filing of a Preliminary Development Plan Application, the Applicant is required to consult with the UDO Administrator at a
Pre-Application Meeting for comments and advice on the appropriate application process and the required procedures, specifications,
and applicable standards required by the UDO.
Step 2. Application Check-In Meeting - Preliminary Development
Plan Submission
Applicant & Staff
Upon receiving input from Staff at the Pre-Application Meeting, the Applicant may submit a Preliminary Development Plan Application
and required submittal materials during a mandatory Application Check-In Meeting where the UDO Administrator will review the
submission for completeness.
Step 3. Review by UDO Administrator & Development Review
Committee
Staff
If the UDO Administrator determines that the Preliminary Development Plan Application is complete, it shall be forwarded to the
Development Review Committee (DRC). The DRC shall review the application and prepare written comments for review with the
Applicant.
Step 4. Development Review Committee Meeting - Preliminary
Development Plan Review
Applicant & Staff
A public meeting shall be held with the Applicant to review the DRC Staff Report and discuss the application. The DRC shall review the
Preliminary Development Plan Application for compliance with the criteria and provisions in the UDO. The Applicant will be directed to
address comments, if any, and resubmit the application materials. If applicable, upon resubmittal, the application materials will be
reviewed for compliance with the DRC Staff Report. The UDO Administrator may approve, approve with conditions, or deny the
application based on whether or not the application is in compliance with the UDO and the DRC comments. Preliminary Development
Plan Application approval shall authorize the Applicant to prepare a Final Development Plan Application for administrative review and
approval.
Step 5. Application Check-In Meeting - Final Development Plan
Submission
Applicant & Staff
The Applicant shall submit the completed Final Development Plan Application and required submittal materials during a mandatory
Application Check-In Meeting where the UDO Administrator will review the submission for completeness.
Step 6. Review by UDO Administrator & Development Review
Committee
Staff
If the UDO Administrator determines that the Final Development Plan application is complete, it shall be forwarded to the DRC. The
DRC shall review the application and prepare written comments for review with the Applicant.
Step 7. Development Review Committee Meeting – Final
Development Plan Review
Applicant & Staff
A public meeting shall be held with the Applicant to review the DRC Staff Report and discuss the application. The DRC shall review the
Preliminary Development Plan Application for compliance with the criteria and provisions in the UDO. The Applicant will be directed to
address comments, if any, and resubmit the application materials. If applicable, upon resubmittal, the application materials will be
reviewed for compliance with the DRC Staff Report. The UDO Administrator may approve, approve with conditions, or deny the
application based on whether or not the application is in compliance with the UDO and the DRC comments.
Step 8. Issue Final Development Permit Staff
If the application is in compliance with the UDO, DRC Staff Report, Preliminary Development Plan approval, and, if all comments are
addressed, the UDO Administrator shall issue the Final Development Permit.
Attachment 1
Page 36
Section VII. Item #2.
TOWN OF BLUFFTON
DEVELOPMENT PLAN
APPLICATION CHECKLIST
Town of Bluffton Applications Manual 1 of 5 Revised 07/28/2014
In accordance with the Town of Bluf fton Unified Development Ordinance (UDO), the following information shall be
included as part of a Development Plan application submitted for review. Depending on the proposal, the amount and
type of documentation will vary. This checklist is intended to assist in the provision of the minimum documentation
necessary to demonstrate compliance with the UDO. Upon review of the submitted application by T own Staff,
additional information may be required. The use of this checklist by Town Staff or the Applicant shall not constitute a
waiver of any requirement contained in the UDO. Applicants are encouraged to work closely with Town Staff in
preparing any application prior to submittal.
Prelim
Plan
Final
Plan
NOTE: Depending on the activities proposed, Development Plan documentation will vary. At minimum, each plan must
contain the General Information and Site & Existing Conditions Documentation in addi tion to information required for the
other specific activities listed below, as applicable. Please contact Town Staff for questions and additional information.
General Information.
x x 1. Name and address of property owner(s) and applicant.
x x 2. If the a pplicant is not the property owner, a letter of agency from the property owner
authorizing the applicant to act on behalf of the property owner.
x x
3. A detailed narrative describing the existing site conditions and uses, proposed development,
proposed uses and activities that will be conducted on the site, stateme nt of conformance
with the UDO, description of any energy conservation or green technologies proposed on the
site, the maintenance responsibility of any common or public areas, and publically dedic ated
improvements to be completed.
x x
4. A listing of any past development permit approval numbers associated with the site and
existing conditions placed on the development property by the Town of Bluffton through past
approvals including a detailed description of how the condition will be met.
x x 5. An explanation of why any items on this checklist are not included with the application
materials.
x x 6. Project name and/or name of development.
x x
7. All plans must include the following: name of county; munic ipality; project location; parcel
identification number(s); date of original design; all dates of revisions; north arrow; graphic
scale; and legend identifying all symbology.
x x 8. Vicinity map.
x x
9. Site data table to include; total acreage, pervious versu s impervious cover, required and
proposed open space calculations, number and area of proposed lots, residential density,
number and area of each proposed structure, area of each use of the property and buildings,
and required and proposed parking calculations.
x x 10. Signature over seal of registered engineer or landscape architect licensed to practice in South
Carolina.
x x 11. Phasing plan if the development is proposed to be developed in phases.
x
12. Letters of approval, including any applicable permits, from the following agencies (as
necessary for the project):
a) United States Army Corp of Engineers;
b) South Carolina Department of Health & Environmental Control;
c) South Carolina Department of Transportation;
d) Beaufort County Engineering;
e) Beaufort County EMS;
f) Beaufort County School District;
g) Bluffton Township Fire District;
h) Beaufort Jasper Water Sewer Authority;
i) Town of Bluffton;
j) Electric Provider;
k) Natural Gas provider; and
Attachment 1
Page 37
Section VII. Item #2.
TOWN OF BLUFFTON
DEVELOPMENT PLAN
APPLICATION CHECKLIST
Town of Bluffton Applications Manual 2 of 5 Revised 07/28/2014
Prelim
Plan
Final
Plan
NOTE: Depending on the activities proposed, Development Plan documentation will vary. At minimum, each plan must
contain the General Information and Site & Existing Conditions Documentation in addi tion to information required for the
other specific activities listed below, as applicable. Please contact Town Staff for questions and additional information.
l) Cable, telephone, and data provider.
Site and Existing Conditions Documentation.
x x 1. Comprehensive color photograph documentation of site and existing conditions. If digital,
images should be at a minimum of 300 dpi resolution.
x x 2. Names of the owners of contiguous parcels and an indication of adjacent existing and
proposed (if known) land uses and zoning.
x x 3. Location of all property lines.
x x
4. Location of municipal limits or county lines, zoning, overlay or special district boundaries, if
they traverse the development property , form a part of the boundary of the development
property, or are contiguous to such boundary.
x x 5. Location of all existing access points and intersections along both sides of any frontage or
access roadway(s) within a minimum of 1,000 feet of the site boundaries.
x x
6. Location, dimens ions, name, and descriptions of all existing or recorded roadways, alleys,
reservations, railroads, easements, or other public rights -of-way on or within 200 feet of the
development property.
x x 7. Location, size, and type of all existing easements, rights -of-way, or utility infrastructure on or
within a minimum of 200 feet of the development property.
x x 8. Existing topography and land cover of project site and adjacent and nearby sites that are
impacted. Contours shall be shown in intervals of 1 foot or less.
x x
9. Location, dimensions, area, descriptions, and flow line of existing watercourses, drainage
structures, ditches, one -hundred (100) year flood elevation, OCRM critical line, wetlands or
riparian corridors top of bank locations, and protected lands on the development property.
x x 10. Location of any existing buildings, structures, parking lots, impervious areas, public and
private infrastructure, or other manmade objects located on the development property.
x x
11. Boundary survey with bearings and distanc es of all property lines, tract/lot acreage, location
of property markers, and seal of a Registered Land Surveyor , as well as a legal description of
the property.
x 12. Location of benchmarks/primary control points or descriptions and ties to such control po ints
to which all dimensions, angles, bearings, block numbers, and similar data shall be referred.
x 13. Existing deed covenants, conditions, and restrictions, including any requirements from a POA
or ARB.
x 14. Proposed deed covenants, conditions, and restric tions, including any design or architectural
standards.
x 15. Legal documents for proposed public dedications.
Lot and Building Pattern.
x 1. Schematic layout and design indicating overall site configuration; roadway design, building
location(s), building size(s); general setbacks, and building orientation(s).
x 2. Detailed layout and design indicating site layout, building location(s), building type(s)/ use(s),
building orientation(s), conceptual building elevations, and setbacks.
x
3. If a PUD, subdivision, office complex, or shopping center, a Master Sign Plan providing unity
in sign design and describing the location, types, materials, shapes, sizes, and compatibility
with the architecture of the development.
Parking.
x 1. General location and ingress/egress of parking areas on the site.
x 2. Location, layout, number of spaces, bicycle parking, and ensuring design shows ADA
accessibility compliance.
x 3. Location of proposed ingress/egress, circulation, loading, parking and pedestrian circulation
elements, and ensuring design shows ADA accessibility compliance.
Attachment 1
Page 38
Section VII. Item #2.
TOWN OF BLUFFTON
DEVELOPMENT PLAN
APPLICATION CHECKLIST
Town of Bluffton Applications Manual 3 of 5 Revised 07/28/2014
Prelim
Plan
Final
Plan
NOTE: Depending on the activities proposed, Development Plan documentation will vary. At minimum, each plan must
contain the General Information and Site & Existing Conditions Documentation in addi tion to information required for the
other specific activities listed below, as applicable. Please contact Town Staff for questions and additional information.
x
4. A parking study documenting the reasons for any increase in the maximum amount of
parking or a similar study documenting the ability of the site to accommodate a reduction of
20% or more to the maximum parking requirements.
x 5. A parking study documenting the ability of a site(s) to accommodate a shared parking
arrangement. A shared parking easement must also be provided.
x
6. Detailed engineering information identifying the location of vehicular and bicycle parking
facilities and the construction specifications, geometrics, arrangement, character, width,
grade, circulation/maneuvering facilities and areas, landscape islands, loading areas, and
including detailed dimensions as are necessary and app ropriate to demonstrate compliance
with all applicable standards and requirements.
Transportation Networks.
x 1. General layout of transportation networks including access to the site, internal roadways, and
access to adjacent properties.
x x
2. A map or sketch showing the general relationship of the development to the surrounding
areas with existing and proposed access roadways referenced to the intersection of the
nearest primary or secondary paved roadway.
x
3. Existing and proposed non -motorized vehi cle lanes, paths, sidewalks, and other facilities,
including transit facilities, on and within 200 feet of the development property including
detailed dimensions as are necessary and appropriate to demonstrate compliance with all
applicable standards and requirements.
x 4. Proposed roadway alignment plan showing right -of-way widths with specific reference to the
roadway type and design assembly.
x
5. Proposed access indicating any access management plans, connectivity, roadway extensions,
proposed stub roads, dead-end roadways, and roadway names including detailed dimensions
as are necessary and appropriate to demonstrate compliance with all applicable standards
and requirements.
x 6. Emergency access provisions.
x 7. A Traffic Assessment demonstrating adherence to MUTCD standards and/or other applicable
requirements.
x 8. A Traffic Impact Analysis (TIA), if warranted by the Traffic Assessment.
x
9. Engineering plan of proposed traffic mitigation measures , including assessment of individual
phase, or approved pay ments in-lieu of such that will be provided to the Town of Bluffton or
applicable agency. Plan must ensure adequate transportation network is in place to support
development at time of construction.
x 10. Vehicular and pedestrian signage plan including crosswalk and pavement marking details.
x 11. Shared access agreements.
x
12. Detailed engineering information identifying the location, construction specifications, typical
sections, geometrics, arrangement, character, width, and grade of existing and proposed
roadways and non-motorized vehicle facilities including detailed dimensions and calculations
as are necessary and appropriate to demonstrate compliance with all applicable standards
and requirements.
Natural Resources, Tree Conservation, Planting, and Landscaping.
x x
1. Location of existing tree canopy coverage including table summarizing canopy lot coverage
area, lot area not covered by tree canopy, and tree canopy expressed as percentage of lot
coverage.
x x 2. Location and table summarizing trees listed on America’s Historic Tree Register as maintained
by American Forests.
Attachment 1
Page 39
Section VII. Item #2.
TOWN OF BLUFFTON
DEVELOPMENT PLAN
APPLICATION CHECKLIST
Town of Bluffton Applications Manual 4 of 5 Revised 07/28/2014
Prelim
Plan
Final
Plan
NOTE: Depending on the activities proposed, Development Plan documentation will vary. At minimum, each plan must
contain the General Information and Site & Existing Conditions Documentation in addi tion to information required for the
other specific activities listed below, as applicable. Please contact Town Staff for questions and additional information.
x 3. Location of groups of trees that connect to other vegetated and/or treed areas on adjacent
sites helping to create or extend a wildlife or natural corridor.
x
4. Location and table su mmarizing trees that have a significant characteristic such as, but not
limited to, allees and hedgerow trees, trees of unique character such as those with unique or
unusual growth habitat, endangered species, or species rarely found in the area.
x 5. Location and table summarizing trees designated as protected to be removed.
x 6. The location and description of existing and proposed landscaping , screening, buffer ing, and
tree preservation areas, including setbacks from natural resource areas.
x
7. Graphic illustration of the existing tree canopy and mature tree canopy of the proposed tree
plantings including a table summarizing the mature canopy of each tree species planted,
canopy lot coverage area, lot area not covered by tree canopy, and tree canopy expre ssed as
percentage of lot coverage (all calculations are excluding rooftop area).
x
8. Detailed landscaping information containing the scientific and common names, quantity and
size of each plant species to be planted, typical installation and maintenance d rawings/notes,
and location and description of irrigation systems.
x 9. Tree protection zones (TPZ) and tree protection fencing and signage locations and installation
specifications.
x 10. Habitat management plan.
x 11. Proposed topographic features, including basic contours at one foot or less intervals.
x 12. Bank stabilization and erosion control measures.
x 13. If applicable, a Forest Management Plan.
Open Space.
x x 1. Proposed open space areas, habitat areas, types, and access trails both on and off-site.
x 2. Proposed public lands and methods of dedication and access.
x 3. Proposed ownership and method of transfer through deed restrictions, covenants, public
dedication, or other method acceptable to the UDO Administrator.
x 4. Proposed use for all portions of dedicated open space.
Stormwater Management.
x x 1. Acknowledgement of compliance with Bluffton Stormwater Design Manual.
x x 2. Description of proposed methods and general layout of stormwater drainage.
x x 3. Proposed drainage system layouts.
x x 4. Proposed methods to remove pollutants.
x x 5. Soil types and permeability characteristics from National Resource Conservation Service.
x 6. Stormwater Drainage Plan with drainage easements.
x 7. Location and area of proposed impervious coverage.
x 8. Pre- and post -development runoff volumes, velocities, hydrographs, with Watershed Maps
and Link Node Diagrams.
x 9. Methods to record and report installation and maintenance activities.
x 10. Stormwater quality monitoring program and pre-development pollutant loading calculations.
x 11. Notarized Operation and Maintenance Agreement signed by responsible party.
Utilities and Services.
x 1. Statement by the Applicant/ Engineer/ Design Professional confirming that they believe the
site can be supplied with adequate utilities.
x 2. Proposed water system layout, or individual well locations.
x 3. Proposed sewer system layout, or individual septic tank locations.
Attachment 1
Page 40
Section VII. Item #2.
Attachment 1
Page 41
Section VII. Item #2.
Attachment 2
Page 42
Section VII. Item #2.
B lu f f t o n S e lf S t o r a g e
E n m a r k e t
N A P A
P a r k e r 's
E s r i, H E R E , G a r m in , ( c ) O p e n S t r e e t M a p c o n t r ib u t o r s
5 / 1 8 / 2 0 2 1 , 2 : 4 0 : 2 3 P M
0 0 . 0 3 0 . 0 60 . 0 1 m i
0 0 . 0 5 0 . 10 . 0 3 k m
1 : 2 , 2 5 7
E s r i, H E R E |
Attachment 3
Page 43
Section VII. Item #2.
BLUFFTON PKWY
OLIVER CT
NON-SIGNALIZED
INTERSECTION
SELF STORAGE
SINGLE ROW 6 MPD CANOPY
4,920 S.F. (LEASEABLE)
5,214 S.F. (GROSS - MEASURED
TO OUTSIDE WALLS)
FFE= 28.3±
ISLAND PLASTER'S
DEVELOPMENT PER
PLAN BY TATE DESIGN
GROUP DATED 10/01/19
70' RIGHT OF WAY
PRIVATE ROAD
(PER DB 2511, PG 2013)
38' ASPHALT
120' RIGHT OF WAY
PUBLIC ROAD
24' ASPHALT
20-161 Main
7.48/1,000 S.F.
39 SPACES
5,214 S.F.
RATIO PROVIDED
SITE ANALYSIS
TOTAL PARKING
PARKER'S
6.00/1,000 S.F.MAX. RATIO ALLOWED
1.88± AC.SITE AREA
OPEN SPACE REQ'D 0.28± AC. (15.0%)
IMPERVIOUS AREA 0.77± AC. (41.0%)
PERVIOUS AREA 1.11± AC. (59.0%)
SITE LEGEND
PAINTING STRIPING LEGEND
SITE PLAN NOTES
SITE
LOCATION MAP
C-1
LEGEND FOR
PROPOSED IMPROVEMENTS
SHEET
REVISION BY
STAMP
3471 DONAVILLE ST
DULUTH, GA 30096
PHONE: 404-567-5701
FAX: 404-567-5703
WWW.BDGSE.COM
SC COA NUMBER: 5277
PROPOSED:
20-161
PRELIM. DEV. PLAN REVIEW
4/14/2021
ADB
SC
CHECKED
PROJECT NO.
ISSUED DATE
ISSUED FOR
FILE
DRAWN
BLUFFTON, BEAUFORT CO., SC
DRAYTON-PARKER COMPANIES, LLC
SAVANNAH, GA 31401
FOR:
SITE PLAN
Attachment 4
Page 44
Section VII. Item #2.
FM
FM
SINGLE ROW 6 MPD CANOPY
4,920 S.F. (LEASEABLE)
5,214 S.F. (GROSS - MEASURED
TO OUTSIDE WALLS)
FFE= 28.3±
70' RIGHT OF WAY
PRIVATE ROAD
(PER DB 2511, PG 2013)
38' ASPHALT
120' RIGHT OF WAY
PUBLIC ROAD24' ASPHALT
H R
H R
H R
H R
✸✸
✸
✸✸
✸
✸
PLANTING PLAN
L1 OF 2
PRELIMINARY
SUBMITTAL PLAN,
NOT FOR
CONSTRUCTION
DRAWING NUMBER
DRAWING TITLE
DESIGN CONCEPTS, DRAWING, SHEETS,
LOGOS, SPECIFICATIONS, DETAILS,
WRITTEN MATERIAL SHALL NOT BE USED
OR REPRODUCED IN WHOLE OR IN PART
IN ANY FORM WITHOUT PRIOR WRITTEN
CONSENT OF WJK LTD.
© 2021 WJK LTD.
THIS SHEET TO SCALE AT: 24"X36"
DATE:
PROJECT NO.:
DRAWN BY:
CHECKED BY:
APR. 28, 2021
15051.34
CB
DK
REVISIONS:
SITE DEVELOPMENT PLANS
FOR
PARKERS KITCHEN
BLUFFTON, SOUTH CAROLINA
STORE #91
c
N
E
W
BLUFFTON PARK PUD DESIGN GUIDELINES
SECTION 6.5 BUSINESS PARK COMMERCIAL LANDSCAPE GUIDELINES
6.5.C. Buffers.
·Frontage Buffers will contain a minimum of four (4) overstory shade trees, and three (3)
understory trees per 100' linear feet of buffer.
·The Frontage Buffers will also contain shrubs adequate to screen vehicles in the parking lots.
These shrubs will have a growth pattern to reach 36" to 42" in height within three (3) years of
planting.
·Side and Rear Yard Buffers will contain sufficient existing and planted overstory trees,
understory trees and shrubs to provide an opaque screen to adjacent properties.
Summer
Vinca
Caladium (Red Flash) - Shade
Coleus - Sun
Pentas
Winter
Viola/Pansies
Ornamental Cabbage/Kale
*Final specifications to be approved by landscape architect
Seasonal Color Plant Selections
020406080
10305070
Scale 1 " = 20'
ISLAND
PLASTERS
DEVELOPMENT
SELF
STORAGE
OLIVER
COURT
BLUFFTON PARKWAY
BUFFERYARD SUMMARY
REQUIRED
4 OVERSTORY TREES PER 100 FEET
(±210 LF)
PROPOSED
8
6
ADJACENT TO BLUFFTON
PARKWAY - FRONTAGE BUFFER
3 UNDERSTORY TREES PER 100 FEET
(±210 LF)
8
6
6.5.K Parking Area and Lot Landscaping.
Parking lot peninsulas will contain one (1) broad-leafed overstory tree in each peninsula,
with grass, groundcovers and/or shrubs filling the ground plane of the peninsula.
FILTER STRIP
FILTER STRIP
1 QUEV
5 ITEV
3 MYRC
7 SPAB
6 DIST
11 MYRC
3 ILEV
7 ILLP
3 ILEV
10 ITEV
1 MAGV
5 PITT
3 LORC
3 PODP
2 MAGV
1 QUEV
5 LORC
7 PODP
1 QUEV
5 PITT
5 LORC
7 PODP
1 QUEV
1 QUEV
LIGHT POLE, TYP.
2 QUEV
SOD
1 QUEV2
SYN. TURF
1 QUEV2
SYN. TURF
1 QUEV2
SOD
1 QUEV2
3 TRAJ
8 PODP
10 LORC2
7 LANC
5 LANC
7 LORC2
5 PODM
1 QUEV
1 ILES
TREE TO REMAIN
1 ILES
3 VIBS
1 QUES
5 DIST
1 CHIV
1 QUEN
3 LORC
3 PITT
3 LAGN
9 PODP
3 PITT
1 QUEV
14 TRIF
1 QUEV
5 DIST
3 LAGN
3 LORC
12 PODP
1 QUES
3 PITT
3 VIBS
1 QUEV
5 DIST
1 CHIV
3 PITT
6 LORC
1 CHAH
1 QUEN
ANNL
10 PODP
5 VIBS
1 QUES
3 VIBS
1 QUEV
3 PITT
10 PODP
ANNL
3 LORC
1 CHAH
3 LORC
6 PODP
3 PITT
7 DIST
2 TRAJ
4 PODP
4 LORC2
5 LORC2
4 PODP
2 TRAJ
5 LORC2
5 PODP
6 ILLP
6.5.N. Planting Requirements.
·Trees will be sized and selected as follows:
··Overstory trees will have a minium caliper of 2.5" and a minimum height of 12' at planting.
··Understory trees will have a minimum caliper of 1" and a minimum height of 8' at planting.
·Shrubs will be a minimum of three (3) gallon container size or the balled and burlapped
equivalent at planting.
·Groundcover will be a minimum of one (1) gallon container size at planting.
·Annuals will be a minimum of 3.5" pots at planting.
·Seeding and Sodding
··All areas to be seeded or sodded must receive a minimum layer of four (4) inches of good,
clean topsoil.
··Lawn areas within 50 feet of a building or adjacent to public roadways require sodding.
Other lawn areas may require sodding depending on slopes, impact on public views,
pedestrian traffic, time of year, as well as other considerations.
··Fertilization and liming will be applied as required by soils analysis.
SEED
DISTURBED
AREA
SEED
DISTURBED
AREA
MULCH DISTURBED AREAS (EXCEPT
FOR SEEDED LOCATIONS), TYP.
TREE TO BE REMOVED, TYP.
6 DIST
1 QUEV
7 DIST
1 QUEV
17 SPAB
3 TAXD
1 QUEN
13 SPAB
MULCH DISTURBED
AREAS (EXCEPT FOR
SEEDED
LOCATIONS), TYP.
SOD
PLANT SCHEDULE
Attachment 5
Page 45
Section VII. Item #2.
Attachment 6
Page 46
Section VII. Item #2.
PLAN REVIEW COMMENTS FOR DP-02-21-015049
Town of Bluffton
Department of Growth Management
20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910
Telephone 843-706-4522
BLUFFTON PARK PHASE C-1
Plan Type: Apply Date:
Plan Status: Plan Address: 5 Oliver Ct Court
BLUFFTON, SC 29910
Development Plan
Active
02/25/2021
Plan PIN #:Case Manager: R610 031 000 0961 0000William Howard
Plan Description: The applicant is requesting approval of a development plan to construct a +/- 5,200 SF convenience store
and fuel station on 1.88 acres located at 5 Oliver Ct.
Technical Review
Submission #: 1 Recieved: 02/25/2021 Completed: 04/01/2021
Reviewing Dept. Complete Date StatusReviewer
Revisions Required04/01/2021Planning Review - Principal William Howard
Comments:
1. Provide a copy of the Approval Letter from the Bluffton Park Commercial ARB.
2. The grease trap is located within the buffer on the northwest side of the parcel and will need to re-located out of the buffer.
3. Per the design guidelines of the Bluffton Park Master Plan provide a pedestrian connection to the multi use path on Bluffton
Parkway.
4. Update the plans to provide wheelstops for parking spaces.
5. The lighting plan provided shows light poles are 22'-24' in height. Per the Bluffton Park design guidelines lighting poles shall be
14' and 20' depending on fixture type. Update the lighting plan accordingly.
Revisions Required04/01/2021Transportation Department Review William Howard
Comments:
1. Staff is awaiting comments and feedback from Beaufort County Traffic Engineering on the Traffic Impact Analysis (TIA) provided.
The TIA identifies the Bluffton Parkway/Oliver Court intersection as a Level of Service F. With the additional trips generated by
construction of the convenience store additional review of the TIA will be necessary.
2. Per the TIA provided, left turn movement into the southern entrance from Oliver Court is not allowed and the driveway exiting to
Oliver Court shall be limited to right turn only. Update the site plan accordingly.
3. At the time of Final Development plan, an encroachment permit from Beaufort County will be required for any improvements to
the intersection of Bluffton Parkway and Oliver Court.
Approved with Conditions04/01/2021Beaufort Jasper Water and Sewer
Review
James Clardy
Comments:
1. Pending formal submittal and approval of water and sewer design.
Approved with Conditions04/01/2021Fire Department Review Dan Wiltse
Comments:
1. No comments at this time.
Approved with Conditions04/01/2021Planning Commission Review Aubrie Giroux
Comments:
1. Once DRC comments have been satisfied the Preliminary Development Plan shall be presented to the Planning Commission for
approval.
Approved04/01/2021Police Department Review Adam Barberio
04/01/2021 Page 1 of 2
Attachment 7
Page 47
Section VII. Item #2.
Approved04/01/2021Watershed Management Review
DRC
William Baugher
Approved03/15/2021Planning Review - Address Nick Walton
Approved03/08/2021Building Safety Review Richard Spruce
Plan Review Case Notes:
04/01/2021 Page 2 of 2
Attachment 7
Page 48
Section VII. Item #2.
TRAFFIC IMPACT AND ACCESS STUDY
PARKERS KITCHEN GAS/CONVENIENCE-STORE
BLUFFTON PARKWAY AT OLIVER COURT
BLUFFTON/BEAUFORT COUNTY, SOUTH CAROLINA
Prepared for:
The Parkers Company
Savannah, GA
Submitted
January, 2021
Prepared by:
EPC, LLC
2404 Taylor Road
Cayce, SC 29033
(803) 794 7018
(803) 794 9216 Fax
Attachment 8
Page 49
Section VII. Item #2.
January 13, 2021
Mr. Daniel Ben-Yisrael, Real Estate Development Manager
The Parkers Company
17 W. McDonough St.
Savannah, GA 31401
Phone: 912 677 0593
E-Mail: dbenyisrael@parkersav.com
RE: Traffic Impact and Access Study
Parkers Gas/Convenience Store
Bluffton Parkway at Oliver Court
Bluffton/Beaufort County, SC
Dear Mr. Ben-Yisrael:
As requested, Encroachment Permit Clearinghouse, LL C (EPC) has completed an assessment of the
traffic impacts associated with the development of a new Parkers Gas Station/Convenience Store (c-store)
to be located at the intersection of Bluffton Parkw ay at Oliver Court in Beaufort County, South Caroli na.
The following provides a summary of this study’s findings:
PROJECT DESCRIPTION
The project site is located in the northwest quadra nt of the intersection of the Bluffton Parkway at O liver
Court/Bluffton Park Crescent and totals approximately 1.9-acres.
The project proposal is to construct a gas-station/ c-store which will provide 12-fueling positions alo ng
with a 4,920 square-foot c-store. This facility doe s not provide a separate diesel fueling area for he avy
vehicles. As scheduled this project is planned to b e constructed and fully operational by 2022. Figure 1
depicts the site location in relation to the regional roadway system (Figures located at end of report).
As planned, direct access to/from the site will be provided to/from Oliver Court via two access drives , no
direct access to/from the Bluffton Parkway is plann ed. Figure 2 depicts the current development plan
proposal.
EXISTING CONDITIONS
A comprehensive field inventory of the project stud y area was conducted which included a field
inventory, collection of geometric data, traffic co ntrol and general information pertaining to the roa dway
system within the study area. The following sectio ns detail the current traffic conditions and includ e a
description of roadways/intersections serving the site and traffic flow in close proximity to the project.
David D. Brewer, P.E. (803) 429 5591 V. Erskine Suber, Jr. (803) 206 2265 Todd E. Salvagin (803) 361 3265
EPC, LLC
2404 Taylor Road
Cayce, SC 29033
(803) 794 7018
(803) 794 9216 Fax
Attachment 8
Page 50
Section VII. Item #2.
Mr. Ben-Yisreal
January 13, 2021
Page 2
Project Study Area
The intersection of Bluffton Parkway at Oliver Cour t has been required to be analyzed in order to
determine project impacts on the surrounding roadwa y network. Figure 3 illustrates the existing
geometrics and traffic control for the study area intersection and surrounding roadways.
Traffic Volumes
In order to determine the existing traffic volume f low patterns within the study area, manual turning
movement counts were performed in the second week o f January 2021 while schools were in session.
Weekday morning (7:00-9:00 AM) and evening (4:00-6: 00 PM) peak period turning movement specific
counts were conducted at the above referenced exist ing study area intersection. Although school is
currently in session it was decided that traffic vo lumes are lower than average due to Covid-19. As pe r
recommendation from the SCDOT District #6, (Septemb er 29, 2020 memorandum) all traffic volumes
were increased by 19-percent during the AM peak-hou r and 13-percent for the PM peak-hour to reflect
more accurate volumes. Figure 4 graphically depict the respective Existing (2021) A M and PM peak-
hour traffic volumes at the study area intersection s. Summarized count sheets are included in the
Appendix of this report.
FUTURE CONDITIONS
Traffic analyses for future conditions have been co nducted for two separate scenarios: first, 2022 No-
Build conditions, which include an annual normal growth in traffic, all pertinent background development
traffic, and any pertinent planned roadway/intersec tion improvements; and secondly, 2022 Build
conditions, which account for all No-Build conditio ns PLUS traffic generated by the proposed
development.
Future No-Build Traffic Conditions
Planned Roadway Improvements & Background Development
Based on discussions with SCDOT district staff, the re are currently no known roadway improvements or
background developments planned within the study area.
Annual Growth Rate
SCDOT permanent count station #556 located on Bluff ton Parkway between Buck Island Road and
Simmonsville Road was reviewed in order to gain an understanding of growth in traffic in the area of t he
site. Over the last three years, growth in traffic along this roadway has been increasing at an annua l rate
of 8-percent per year. The anticipated 2022 No-Bui ld AM and PM peak-hour traffic volumes, which
reflect the annual 8-percent growth rate, are shown in Figure 5.
Site-Generated Traffic
Traffic volumes expected to be generated by the proposed project were forecasted using the Tenth Edition
of the ITE Trip Generation manual, as published by the Institute of Transport ation Engineers. After
reviewing the size of the project and prospective s ervices provided, Land-Use Code #960 (Super
Gas/Service with Convenience Store) was selected to estimate the specific site-generated traffic. Table 1
depicts the anticipated site-generated traffic.
Attachment 8
Page 51
Section VII. Item #2.
Mr. Ben-Yisreal
January 13, 2021
Page 3
Table 1
PROJECT TRIP-GENERATION SUMMARY1
Parkers Gas/C-Store
SC 46 Bluffton, SC
12 Fuel Position
Gas/C-Store
4,920 sf
60 Percent
Pass-By
2
Total
New Trips
Time Period (a) (b) (a-b)
Weekday Daily 4,100 2,460 1,640
AM Peak-Hour
Enter 169 101 68
Exit 169 101 68
Total 338 202 136
PM Peak-Hour
Enter 138 83 55
Exit 138 83 55
Total 276 166 110
1 ITE Trip Generation manual, 10th Ed. 2017, LUC 960 (Super Convienience Store/Gas-Station).
Variable used is fueling positions.
2 Sixty percent pass-by assumed based on ITE Handbo ok methodologies and the two-way volume of
traffic on both N . Rhett and Tanner Ford.
The proposed development will be composed of a 4,92 0-sf C-store and 12-positions of fueling service.
Using the ITE reference, the project can be expecte d to generate a total of 4,100 two-way daily trips of
which a total of 338 trips (169 entering and 169 ex iting) are expected during the AM peak-hour. Durin g
the PM peak-hour, a total of 276 trips (138 entering, 138 exiting) are expected.
Typically, the majority of vehicle trips generated by these of land-use types draw from existing traff ic
passing on the adjacent street referred to as pass-by or impulse trips. Pass-by trips are trips made to the
proposed development as intermediate stops on the w ay from an origin to a primary trip destination. I t
is important to note that pass-by trips do not redu ce the amount of traffic generated by the site, and the
“total trips” generated are expected to enter and e xit the site no matter what percentage of pass-by t rips
is used. Pass-by trips are simply that portion of the site-generated traffic that are not a function of the
land uses in the area, but are only a function of t he type of use proposed on the site and the volume of
traffic on the adjacent roadways. For this particu lar project, a pass-by reduction of 60-percent has been
used report based on ITE methodologies and the high volume of peak-hour traffic flow on Bluffton
Parkway.
Once the pass-by reduction was applied to the antic ipated external trips, the proposed development can
be expected to generate 1,640 new external trips on a weekday daily basis, of which a total of 136 new
trips (68 entering, 68 exiting) can be expected dur ing the AM peak-hour. During the PM peak-hour,
110 new trips (55 entering, 55 exiting) can be expected.
Distribution Pattern
The directional distribution of site-generated traf fic on the study area roadways has been based on an
evaluation of existing travel patterns. Bluffton Pa rkway is expected to account for 100-percent of the
pass-by and nearly all of the new trips generated w hile Bluffton Park Crescent is expected to account for
2-percent. These anticipated patterns are shown in Table 2. This distribution pattern has been applied to
Attachment 8
Page 52
Section VII. Item #2.
Mr. Ben-Yisreal
January 13, 2021
Page 4
the site-generated traffic volumes from Table 1 to develop the site-generated specific volumes for the
study area intersections illustrated in Figure 6.
Table 2
TRIP DISTRIBUTION PATTERN
Parkers Gas/C-Store
SC 46 Bluffton, SC
Roadways Direction To/From
Percent
Enter/Exit
Bluffton Parkway West 49
East 49
Bluffton Park Crescent South 2
Total 100
Note: Based on the existing traffic patterns.
Future Build Traffic Conditions
The site-generated traffic, as depicted in Figure 6 , have been added to the respective 2022 No-Build
traffic volumes shown by Figure 5. This results in the peak-hour Build traffic volumes, which are
graphically depicted in Figure 7 . These volumes were used as the basis to determine potential
improvement measures necessary to mitigate traffic impacts caused by the project.
TRAFFIC OPERATIONS
Analysis Methodology
A primary result of capacity analysis is the assign ment of Level-of-Service (LOS) to traffic facilitie s
under various traffic flow conditions. The concept of Level-of-Service is defined as a qualitative measure
describing operational conditions within a traffic stream and their perception by motorists and/or
passengers. A Level-of-Service designation provide s an index to the quality of traffic flow in terms of
such factors as speed, travel time, freedom to mane uver, traffic interruptions, comfort, convenience, and
safety.
Six Levels-of-Service are defined for each type of facility (signalized and unsignalized intersections ).
They are given letter designations from A to F, wit h LOS A representing the best operating conditions
and LOS F the worst.
Since the Level-of-Service of a traffic facility is a function of the traffic flows placed upon it, su ch a
facility may operate at a wide range of Levels-of-S ervice depending on the time of day, day of week, o r
period of a year.
Analysis Results
As part of this TIAS, capacity analyses have been p erformed at the study area intersections under both
Existing and Future (No-Build & Build) conditions. The results of these analyses are summarized in
Table 3.
Attachment 8
Page 53
Section VII. Item #2.
Mr. Ben-Yisreal
January 13, 2021
Page 5
Table 3
LEVEL-OF-SERVICE SUMMARY1
Parkers Gas/C-Store
SC 46 Bluffton, SC
Time 2021 E XISTING 2022 NO-BUILD 2022 BUILD
Unsignalized Intersection Period Delay
2
LOS
3
Delay LOS Delay LOS
AM >300.0 F >300.0 F >300.0 F
PM >300.0 F >300.0 F >300.0 F
1. Calculations completed using the HCM 6th Editio n.
2. Delay in seconds-per-vehicle.
3. LOS = Level-of-Service.
GE NERAL NO T E S:
1. For unsignalized intersections, Delay is represe ntative of critical movement/lane group/approach.
Bluffton Parkway at Oliver Court
As shown in Table 3, under each condition and peak- hour analyzed, operations at the unsignalized
intersection of Bluffton Parkway at Oliver Court ar e operating at a LOS F with significant delays. Th ese
delays are on the minor street approaches of Blufft on Park Crescent and Oliver Court and occur under
2021 Existing conditions through Build. The reason ing for this is due to the heavy volume of through
traffic on the Bluffton Parkway which total over 2, 000 vehicles during the AM peak-hour and over 3,000
vehicles during the PM peak-hour.
With these levels of peak-hour volumes, any left-tu rn movements from either minor street approaches
will result in delays which is way the Bluffton Par kway was planned with spaced signalized intersectio ns
as well as planned median breaks to accommodate U-t urn movements. Opportunities for U-turns are
available at adjacent intersections to the west (Simmonsville Road-signalized) and to the east (Persimmon
Street-unsignalized or Red Cedar-signalized).
It should be noted that queue lengths for the major street (Bluffton Parkway) left-turn movements were
reviewed and found that the existing separate turni ng lane storage lengths are more than adequate to
accommodate the projected traffic volumes.
MITIGATION
The final phase of the analysis process is to ident ify mitigating measures which may either minimize t he
impact of the project on the transportation system or tend to alleviate poor service levels not caused by the
project. The following describes measures necessary to mitigate the project’s impact.
Site Access Drives
As planned, access to/from the site will be provide d via two drives to/from Oliver Court. The specific
geometric and traffic control requirements for each proposed access driveway are discussed in detail
below:
Attachment 8
Page 54
Section VII. Item #2.
Mr. Ben-Yisreal
January 13, 2021
Page 6
Northern Site Access
This access is located approximately 300-feet north east of the Bluffton Parkway (150-feet east of the site
access closest to Bluffton Parkway) within the cul- de-sac perimeter of Oliver Court. This access shou ld
provide a two-lane cross-section with one lane ente ring the site and one lane exiting the site and ope rate
under STOP sign control.
Southern Site Access
This access is located approximately 80-feet north of the Bluffton Parkway. Based on operations of th e
adjacent unsignalized intersection with the Bluffto n Parkway and expected queuing, this intersection w ill
basically serve right-turn movements exiting the si te. Entering left-turn traffic should be prohibite d and
forced to utilize the access referenced above only 150-feet to the north. This access could allow right-turn
movements entering the site from Oliver Court but t his access would be redundant and the movement
likely not utilized. This access would operate as a single exiting lane from the site and be for righ t-turn
movements under STOP sign control. It should be n oted that queues from the unsignalized intersection
of Bluffton Parkway at Oliver Court will extend pas t/across this access and will likely result in vehi cles
stacked within the site waiting to make the right-turn onto Oliver Court towards the Bluffton Parkway.
Bluffton Parkway at Oliver Court/Bluffton Park Crescent
This adjacent intersection operates poorly under al l conditions (Existing through future Build). Sepa rate
turning lanes are provided on both eastbound and we stbound approaches of the Bluffton Parkway and
both minor street approaches have separate turning lanes.
Presented service levels are for both the minor str eet approaches of Oliver Court and Bluffton Park
Crescent and represent the left-turn and through mo vements. Operations for the Bluffton Parkway
movements are all acceptable; LOS C or better. Thi s is typical of unsignalized intersections with mul ti-
lane arterials where priority is given to the major roadway and delays occur on the minor street approach.
Signalization of this intersection is not probable as federal signal warrants met would be the peak-ho ur
only and neither the four or eight-hour warrants wo uld exceed the minimum requirements. Additionally,
when the Bluffton Parkway was planned, spacing of t raffic signals was completed which maintain the
efficiency of the corridor to serve east/west throu gh traffic thereby aiding in the demand placed on U S
278. Spacing from the Simmonsville Road signalized intersection is approximately 1,100-feet which
does not meet typical separation standards.
This intersection was planned as a full-movement in tersection to allow Bluffton Parkway U-turn
movements in both eastbound and westbound direction s which are currently taking place. Site traffic
making a left-turn from Oliver Court has this option at the signalized Simmonsville Road intersection and
can take advantage of this movement especially duri ng peak hours of traffic flow on the Bluffton
Parkway. During off-peak hours when volumes are no t as heavy on the Bluffton Parkway, left-turn
movements will likely not have such high delays.
Attachment 8
Page 55
Section VII. Item #2.
Mr. Ben-Yisreal
January 13, 2021
Page 7
SUMMARY
EPC has completed an assessment of the traffic impacts associated with the development of a new Parkers
gas/c-store, to be located at the intersection of B luffton Parkway at Oliver Court in Beaufort County,
South Carolina.
As planned, a new gas-station facility will be cons tructed which will provide 12-fueling positions alo ng
with an approximately 4,920-sf c-store. The access for this new development is planned via two access
drives located along Oliver Court. Recommendation s have been made for each of the site access drives
which include cross-section, traffic control and th e limitation of the access closest to the Bluffton
Parkway to right-turn exiting movements only.
If you have any questions or comments regarding any information contained within this report, please
contact me at (803) 361 3265.
Regards,
Todd E. Salvagin
EPC, LLC
Attachments
Attachment 8
Page 56
Section VII. Item #2.
N N Figure 1
SITE LOCATION MAP
Parkers Kitchen: Bluffton Parkway at Oliver Court
Bluffton/Beaufort County, SC
EPC, LLC
SITE
Attachment 8
Page 57
Section VII. Item #2.
AUTO PARTS
SHOPPING CENTER
BLUFFTON PKWY
OLIVER CT
BLUFFTON PARK CRESCENT
NON-SIGNALIZED
INTERSECTION
SELF STORAGE
MASTER
POND
SINGLE ROW 6 MPD CANOPY
4,920 S.F.
(LEASEABLE)
5,330 S.F.
(GROSS - MEASURED
TO OUTSIDE WALLS)
DUMPSTER ENCLOSURE
PROPOSED SIGN
PROPOSED TANKS
LOADING ZONE
Not For Construction
CONCEPTUAL
SITE PLAN
P-3
7.32/1,000 S.F.
39 SPACES
5,330 S.F.
RATIO PROVIDED
SITE ANALYSIS
TOTAL PARKING
PARKER'S
6.00/1,000 S.F.MAX. RATIO ALLOWED
1.88 ± AC.SITE AREA
LEGEND FOR
PROPOSED IMPROVEMENTS
20-161
CONCEPTUAL REVIEW
11/30/2020
ADB
SC
CHECKED
PROJECT NO.
ISSUED DATE
ISSUED FOR
FILE
SHEET
DRAWN
REVISION BY
STAMP
3471 DONAVILLE ST
DULUTH, GA 30096
PHONE: 404-567-5701
FAX: 404-567-5703
WWW.BDGSE.COM
BLUFFTON, BEAUFORT COUNTY, SC
PROPOSED:
DRAYTON-PARKER COMPANIES, LLC
SAVANNAH, GA 31401
FOR:
DUE DILIGENCE NOTES
20-161 P-3
Attachment 8
Page 58
Section VII. Item #2.
Attachment 8
Page 59
Section VII. Item #2.
Attachment 8
Page 60
Section VII. Item #2.
Attachment 8
Page 61
Section VII. Item #2.
Attachment 8
Page 62
Section VII. Item #2.
Attachment 8
Page 63
Section VII. Item #2.
COUNT DATA
Attachment 8
Page 64
Section VII. Item #2.
% Bank 1 % Bank 2
95.4% 4.6%
% Bank 3 % Bank 4
0.0% 0.0%
U L T R P1 P2 Veh U L T R P1 P2 Veh U L T R P1 P2 Veh U L T R P1 P2 Veh
0 13 0 7 0 0 20 0 2 1 9 0 0 12 1 22 159 7 0 0 189 3 5 291 30 0 0 329 550 0
0 19 0 7 0 0 26 0 3 0 9 0 0 12 0 25 183 4 0 0 212 3 5 280 30 0 0 318 568 0
0 15 0 6 0 0 21 0 2 0 10 0 0 12 0 19 185 3 0 0 207 10 6 265 36 0 0 317 557 0
0 12 0 9 0 0 21 0 3 0 5 0 0 8 2 22 191 2 0 0 217 2 6 302 24 0 0 334 580 0
U L T R P1 P2 Veh U L T R P1 P2 Veh U L T R P1 P2 Veh U L T R P1 P2 Veh Vehicle s Pedestrians
0 59 0 29 0 0 88 0 10 1 33 0 0 44 3 88 718 16 0 0 825 18 22 1138 120 0 0 1298 2 255 0
- 0.78 - 0.81 - - 0.85 - 0.83 0.25 0.83 - - 0.92 0.38 0.88 0.94 0.57 - - 0.95 0.45 0.92 0.94 0.83 - - 0.97 0.97 -
0.0% 86.4% 0.0% 89.7% 0.0% 80.0% 100.0% 81.8% 100.0% 88.6% 96 .5% 87.5% 100.0% 90.9% 97.2% 88.3%
0.0% 13.6% 0.0% 10.3% 0.0% 20.0% 0.0% 18.2% 0.0% 11.4% 3.5% 12 .5% 0.0% 9.1% 2.8% 11.7%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0 % 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0 % 0.0% 0.0% 0.0%
Turning Movement Count Report
Study Summary
Study Information
Report Generated Using Turning Movement Count for A ndroid by PortableStudies.com
Total
Pedestrians
Peak Hour Volume
2255
Time
Period
Count Name
Bluffon Park Crest EB WB Oliver Ct NB Bluffton Pkwy (Away HHI) SB Bluffton Pkwy (To HHI)
Bluffton Parkway at Oliver Ct AM PK
Scott Brewer
Wednesday, January 6, 2021
Location
NotesPerformed By
Date
8:15 AM
7:30 AM
7:45 AM
Bluffton SC, Not Available
8:00 AM
Total
Vehicles
Vehicle Movement Summary
Bluffon Park Crest EB
% Bank 4
Pedestrians Volume
0
Need a custom report?
Contact:
support@portablestudies.com
PHF
% Bank 1
% Bank 2
% Bank 3
WB Oliver Ct NB Bluffton Pkwy (Away HHI)
Peak Hour Data
U = U Turn L = Left Turn T = Thru R = Right Turn
P1 = Pedestrian Direction 1 P2 = Pedestrian Direction 2
Veh = Total Vehicles for Approach
Entire Intersection
Movement /
Details
SB Bluffton Pkwy (To HHI)
Movement Volume
Attachment 8
Page 65
Section VII. Item #2.
% Bank 1 % Bank 2
98.5% 1.5%
% Bank 3 % Bank 4
0.0% 0.0%
U L T R P1 P2 Veh U L T R P1 P2 Veh U L T R P1 P2 Veh U L T R P1 P2 Veh
0 21 0 7 0 0 28 0 3 0 6 0 0 9 2 27 382 4 0 0 415 9 2 213 17 0 0 241 693 0
0 14 0 10 0 0 24 0 0 0 6 0 0 6 4 31 409 8 0 0 452 9 7 232 17 0 0 265 747 0
0 12 0 14 0 0 26 0 1 0 16 0 0 17 3 25 473 5 0 0 506 10 10 227 20 0 0 267 816 0
0 10 0 12 0 0 22 0 0 0 6 0 0 6 1 31 423 2 0 0 457 11 2 215 26 0 0 254 739 0
U L T R P1 P2 Veh U L T R P1 P2 Veh U L T R P1 P2 Veh U L T R P1 P2 Veh Vehicle s Pedestrians
0 57 0 43 0 0 100 0 4 0 34 0 0 38 10 114 1687 19 0 0 1830 39 21 887 80 0 0 102 7 2995 0
- 0.68 - 0.77 - - 0.89 - 0.33 - 0.53 - - 0.56 0.63 0.92 0.89 0.59 - - 0 .90 0.89 0.53 0.96 0.77 - - 0.96 0.92 -
0.0% 98.2% 0.0% 95.3% 0.0% 100.0% 0.0% 97.1% 100.0% 97.4% 99. 2% 94.7% 100.0% 90.5% 98.0% 93.8%
0.0% 1.8% 0.0% 4.7% 0.0% 0.0% 0.0% 2.9% 0.0% 2.6% 0.8% 5.3% 0.0 % 9.5% 2.0% 6.3%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0 % 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0 % 0.0% 0.0% 0.0%
Turning Movement Count Report
Study Summary
Study Information
Report Generated Using Turning Movement Count for A ndroid by PortableStudies.com
Total
Pedestrians
Peak Hour Volume
2995
Time
Period
Count Name
Bluffon Park Crest EB Oliver Ct NB Bluffton Pkwy (Away HHI) SB Bluffton Pkwy (To HHI)
Bluffton Parkway at Oliver Ct PM Peak
Scott Brewer
Tuesday, January 5, 2021
Location
NotesPerformed By
Date
5:30 PM
4:45 PM
5:00 PM
Bluffton SC, Not Available
5:15 PM
Total
Vehicles
Vehicle Movement Summary
Bluffon Park Crest EB
% Bank 4
Pedestrians Volume
0
Need a custom report?
Contact:
support@portablestudies.com
PHF
% Bank 1
% Bank 2
% Bank 3
Oliver Ct NB Bluffton Pkwy (Away HHI)
Peak Hour Data
U = U Turn L = Left Turn T = Thru R = Right Turn
P1 = Pedestrian Direction 1 P2 = Pedestrian Direction 2
Veh = Total Vehicles for Approach
Entire Intersection
Movement /
Details
SB Bluffton Pkwy (To HHI)
Movement Volume
Attachment 8
Page 66
Section VII. Item #2.
CAPACITY ANALYSIS
• 2021 Existing
• 2022 No-Build
• 2022 Build
Attachment 8
Page 67
Section VII. Item #2.
PARKERS OLIER CT BEAUFORT AM EXISTING
5: Bluffton Park Crescent/Oliver Ct & Bluffton Pkwy 01/11/2021
Baseline HCM 6th TWSC
Page 1
Intersection
Int Delay, s/veh 64.9
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 22 1138 120 3 88 718 16 59 0 29 10 1 33
Future Vol, veh/h 18 22 1138 120 3 88 718 16 59 0 29 10 1 33
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - - Free - - - Free - - None - - None
Storage Length - 200 - 225 - 175 - 210 - - 95 85 - -
Veh in Median Storage, # - - 0 - - - 0 - - 0 - - 0 -
Grade, % - - 0 - - - 0 - - 0 - - 0 -
Peak Hour Factor 97 97 97 97 97 97 97 97 97 97 97 97 97 97
Heavy Vehicles, % 2 9 3 12 2 12 4 13 14 2 11 20 2 18
Mvmt Flow 22 27 1396 147 4 108 881 20 72 0 36 12 1 40
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 881 881 0 - 1396 1396 0 0 2159 2599 698 1901 2599 441
Stage 1 - - - - - - - - 1494 1494 - 1105 1105 -
Stage 2 - - - - - - - - 665 1105 - 796 1494 -
Critical Hdwy 6.44 4.28 - - 6.44 4.34 - - 7.78 6.54 7.12 7.9 6.54 7.26
Critical Hdwy Stg 1 - - - - - - - - 6.78 5.54 - 6.9 5.54 -
Critical Hdwy Stg 2 - - - - - - - - 6.78 5.54 - 6.9 5.54 -
Follow-up Hdwy 2.52 2.29 - - 2.52 2.32 - - 3.64 4.02 3.41 3.7 4.02 3.48
Pot Cap-1 Maneuver 396 720 - 0 184 437 - 0 ~ 23 24 363 34 24 522
Stage 1 - - - 0 - - - 0 115 185 - 196 285 -
Stage 2 - - - 0 - - - 0 388 285 - 310 185 -
Platoon blocked, % - -
Mov Cap-1 Maneuver 506 506 - - 415 415 - - ~ 15 16 363 23 16 522
Mov Cap-2 Maneuver - - - - - - - - ~ 15 16 - 23 16 -
Stage 1 - - - - - - - - 104 167 - 177 208 -
Stage 2 - - - - - - - - 260 208 - 253 167 -
Approach EB WB NB SB
HCM Control Delay, s 0.4 1.9 $ 1499.8 79
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT WBL WBT SBLn1 SBLn2
Capacity (veh/h) 15 363 506 - 415 - 23 270
HCM Lane V/C Ratio 4.825 0.098 0.097 - 0.269 - 0.533 0.154
HCM Control Delay (s) $ 2229.1 16 12.9 - 16.8 - 277 20.8
HCM Lane LOS F C B - C - F C
HCM 95th %tile Q(veh) 9.9 0.3 0.3 - 1.1 - 1.6 0.5
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Attachment 8
Page 68
Section VII. Item #2.
PARKERS OLIER CT BEAUFORT PM EXISTING
8: Bluffton Park Crescent/Oliver Ct & Bluffton Pkwy 01/12/2021
Baseline HCM 6th TWSC
Page 1
Intersection
Int Delay, s/veh 737.4
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 39 21 887 80 10 114 1687 19 57 0 42 4 0 34
Future Vol, veh/h 39 21 887 80 10 114 1687 19 57 0 42 4 0 34
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - - None - - - None - - None - - None
Storage Length - 200 - 225 - 175 - 210 - - 95 85 - -
Veh in Median Storage, # - - 0 - - - 0 - - 0 - - 0 -
Grade, % - - 0 - - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 1 2 7 2 3 2 6 2 2 5 2 2 3
Mvmt Flow 48 26 1089 98 12 140 2072 23 70 0 52 5 0 42
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 2072 2095 0 0 1089 1187 0 0 2577 3636 545 3069 3711 1036
Stage 1 - - - - - - - - 1237 1237 - 2376 2376 -
Stage 2 - - - - - - - - 1340 2399 - 693 1335 -
Critical Hdwy 6.44 4.12 - - 6.44 4.16 - - 7.54 6.54 7 7.54 6.54 6.96
Critical Hdwy Stg 1 - - - - - - - - 6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 - - - - - - - - 6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.52 2.21 - - 2.52 2.23 - - 3.52 4.02 3.35 3.52 4.02 3.33
Pot Cap-1 Maneuver 66 263 - - 291 578 - - ~ 13 5 475 5 4 227
Stage 1 - - - - - - - - 186 246 - 35 66 -
Stage 2 - - - - - - - - 161 64 - 400 221 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 77 77 - - 528 528 - - ~ 1 0 475 ~ 1 0 227
Mov Cap-2 Maneuver - - - - - - - - ~ 1 0 - ~ 1 0 -
Stage 1 - - - - - - - - ~ 8 11 - ~ 2 47 -
Stage 2 - - - - - - - - 94 46 - 15 10 -
Approach EB WB NB SB
HCM Control Delay, s 10.7 1 $ 21862.1 $ 805.1
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 1 475 77 - - 528 - - 1 227
HCM Lane V/C Ratio 70.011 0.109 0.957 - - 0.288 - - 4.913 0.184
HCM Control Delay (s) $ 37961.1 13.5 182.9 - - 14.6 - - $ 7440.8 24.4
HCM Lane LOS F B F - - B - - F C
HCM 95th %tile Q(veh) 11 0.4 5.1 - - 1.2 - - 1.6 0.7
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Attachment 8
Page 69
Section VII. Item #2.
PARKERS OLIER CT BEAUFORT AM EXISTING
5: Bluffton Park Crescent/Oliver Ct & Bluffton Pkwy 01/11/2021
Baseline HCM 6th TWSC
Page 1
Intersection
Int Delay, s/veh 97.9
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 22 1138 120 3 88 718 16 59 0 29 10 1 33
Future Vol, veh/h 18 22 1138 120 3 88 718 16 59 0 29 10 1 33
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - - Free - - - Free - - None - - None
Storage Length - 200 - 225 - 175 - 210 - - 95 85 - -
Veh in Median Storage, # - - 0 - - - 0 - - 0 - - 0 -
Grade, % - - 0 - - - 0 - - 0 - - 0 -
Peak Hour Factor 97 97 97 97 97 97 97 97 97 97 97 97 97 97
Heavy Vehicles, % 2 9 3 12 2 12 4 13 14 2 11 20 2 18
Mvmt Flow 24 29 1490 157 4 115 940 21 77 0 38 13 1 43
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 940 940 0 - 1490 1490 0 0 2305 2774 745 2029 2774 470
Stage 1 - - - - - - - - 1596 1596 - 1178 1178 -
Stage 2 - - - - - - - - 709 1178 - 851 1596 -
Critical Hdwy 6.44 4.28 - - 6.44 4.34 - - 7.78 6.54 7.12 7.9 6.54 7.26
Critical Hdwy Stg 1 - - - - - - - - 6.78 5.54 - 6.9 5.54 -
Critical Hdwy Stg 2 - - - - - - - - 6.78 5.54 - 6.9 5.54 -
Follow-up Hdwy 2.52 2.29 - - 2.52 2.32 - - 3.64 4.02 3.41 3.7 4.02 3.48
Pot Cap-1 Maneuver 363 683 - 0 160 401 - 0 ~ 18 19 337 27 19 499
Stage 1 - - - 0 - - - 0 99 165 - 175 263 -
Stage 2 - - - 0 - - - 0 365 263 - 286 165 -
Platoon blocked, % - -
Mov Cap-1 Maneuver 469 469 - - 379 379 - - ~ 11 12 337 17 12 499
Mov Cap-2 Maneuver - - - - - - - - ~ 11 12 - 17 12 -
Stage 1 - - - - - - - - 88 147 - 156 180 -
Stage 2 - - - - - - - - 227 180 - 226 147 -
Approach EB WB NB SB
HCM Control Delay, s 0.5 2.1 $ 2272.8 119.3
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT WBL WBT SBLn1 SBLn2
Capacity (veh/h) 11 337 469 - 379 - 17 227
HCM Lane V/C Ratio 7.022 0.113 0.112 - 0.314 - 0.77 0.196
HCM Control Delay (s) $ 3381.6 17 13.6 - 18.8 -$ 440.9 24.7
HCM Lane LOS F C B - C - F C
HCM 95th %tile Q(veh) 10.9 0.4 0.4 - 1.3 - 2 0.7
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Attachment 8
Page 70
Section VII. Item #2.
PARKERS OLIER CT BEAUFORT AM EXISTING
8: Bluffton Park Crescent/Oliver Ct & Bluffton Pkwy 01/11/2021
Baseline HCM 6th TWSC
Page 1
Intersection
Int Delay, s/veh 7.2
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 39 21 887 80 10 114 1687 19 57 0 42 4 0 34
Future Vol, veh/h 39 21 887 80 10 114 1687 19 57 0 42 4 0 34
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - - None - - - None - - None - - None
Storage Length - 200 - 225 - 175 - 210 - - 95 85 - -
Veh in Median Storage, # - - 0 - - - 0 - - 0 - - 0 -
Grade, % - - 0 - - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 1 2 7 2 3 2 6 2 2 5 2 2 3
Mvmt Flow 51 28 1167 105 13 150 2219 25 75 0 55 5 0 45
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 2219 2244 0 0 1167 1272 0 0 2761 3895 584 3287 3975 1110
Stage 1 - - - - - - - - 1325 1325 - 2545 2545 -
Stage 2 - - - - - - - - 1436 2570 - 742 1430 -
Critical Hdwy 6.44 4.12 - - 6.44 4.16 - - 7.54 6.54 7 7.54 6.54 6.96
Critical Hdwy Stg 1 - - - - - - - - 6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 - - - - - - - - 6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.52 2.21 - - 2.52 2.23 - - 3.52 4.02 3.35 3.52 4.02 3.33
Pot Cap-1 Maneuver 53 230 - - 259 536 - - ~ 9 3 447 ~ 4 3 202
Stage 1 - - - - - - - - 164 223 - 27 54 -
Stage 2 - - - - - - - - 140 52 - 374 199 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 61 61 - - 486 486 - - - 0 447 - 0 202
Mov Cap-2 Maneuver - - - - - - - - - 0 - - 0 -
Stage 1 - - - - - - - - 164 0 - 27 36 -
Stage 2 - - - - - - - - ~ 72 35 - - 0 -
Approach EB WB NB SB
HCM Control Delay, s 18.9 1.1
HCM LOS - -
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) - 447 61 - - 486 - - - 202
HCM Lane V/C Ratio - 0.124 1.294 - - 0.336 - - - 0.221
HCM Control Delay (s) - 14.2$ 323.1 - - 16.1 - - - 27.8
HCM Lane LOS - B F - - C - - - D
HCM 95th %tile Q(veh) - 0.4 6.7 - - 1.5 - - - 0.8
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Attachment 8
Page 71
Section VII. Item #2.
PARKERS OLIER CT BEAUFORT AM BUILD
5: Bluffton Park Crescent/Oliver Ct & Bluffton Pkwy 01/11/2021
Baseline HCM 6th TWSC
Page 1
Intersection
Int Delay, s/veh 335.3
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 23 122 1385 152 4 112 871 94 75 1 37 87 2 136
Future Vol, veh/h 23 122 1385 152 4 112 871 94 75 1 37 87 2 136
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - - Free - - - Free - - None - - None
Storage Length - 200 - 225 - 175 - 210 - - 95 85 - -
Veh in Median Storage, # - - 0 - - - 0 - - 0 - - 0 -
Grade, % - - 0 - - - 0 - - 0 - - 0 -
Peak Hour Factor 97 97 97 97 97 97 97 97 97 97 97 97 97 97
Heavy Vehicles, % 2 9 3 12 2 12 4 13 14 2 11 20 2 18
Mvmt Flow 24 126 1428 157 4 115 898 97 77 1 38 90 2 140
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 898 898 0 - 1428 1428 0 0 2416 2864 714 2151 2864 449
Stage 1 - - - - - - - - 1728 1728 - 1136 1136 -
Stage 2 - - - - - - - - 688 1136 - 1015 1728 -
Critical Hdwy 6.44 4.28 - - 6.44 4.34 - - 7.78 6.54 7.12 7.9 6.54 7.26
Critical Hdwy Stg 1 - - - - - - - - 6.78 5.54 - 6.9 5.54 -
Critical Hdwy Stg 2 - - - - - - - - 6.78 5.54 - 6.9 5.54 -
Follow-up Hdwy 2.52 2.29 - - 2.52 2.32 - - 3.64 4.02 3.41 3.7 4.02 3.48
Pot Cap-1 Maneuver 386 710 - 0 176 424 - 0 ~ 14 16 354 ~ 22 16 516
Stage 1 - - - 0 - - - 0 81 142 - 187 275 -
Stage 2 - - - 0 - - - 0 376 275 - 224 142 -
Platoon blocked, % - -
Mov Cap-1 Maneuver 574 574 - - 401 401 - - ~ 5 8 354 ~ 11 8 516
Mov Cap-2 Maneuver - - - - - - - - ~ 5 8 - ~ 11 8 -
Stage 1 - - - - - - - - ~ 60 105 - 138 193 -
Stage 2 - - - - - - - - 190 193 - 146 105 -
Approach EB WB NB SB
HCM Control Delay, s 1.3 2.1 $ 5400.9 $ 1523.7
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT WBL WBT SBLn1 SBLn2
Capacity (veh/h) 5 354 574 - 401 - 11 269
HCM Lane V/C Ratio 15.67 0.108 0.26 - 0.298 - 8.154 0.529
HCM Control Delay (s) $ 8022.3 16.4 13.5 - 17.8 - $ 3889.1 32.5
HCM Lane LOS F C B - C - F D
HCM 95th %tile Q(veh) 11.7 0.4 1 - 1.2 - 12.5 2.9
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Attachment 8
Page 72
Section VII. Item #2.
PARKERS OLIER CT BEAUFORT AM BUILD
8: Bluffton Park Crescent/Oliver Ct & Bluffton Pkwy 01/11/2021
Baseline HCM 6th TWSC
Page 1
Intersection
Int Delay, s/veh 27.7
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 47 81 1044 97 12 138 1987 104 69 1 51 61 1 122
Future Vol, veh/h 47 81 1044 97 12 138 1987 104 69 1 51 61 1 122
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - - None - - - None - - None - - None
Storage Length - 200 - 225 - 175 - 210 - - 95 85 - -
Veh in Median Storage, # - - 0 - - - 0 - - 0 - - 0 -
Grade, % - - 0 - - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 1 2 7 2 3 2 6 2 2 5 2 2 3
Mvmt Flow 51 88 1135 105 13 150 2160 113 75 1 55 66 1 133
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 2160 2273 0 0 1135 1240 0 0 2820 4012 568 3332 4004 1080
Stage 1 - - - - - - - - 1413 1413 - 2486 2486 -
Stage 2 - - - - - - - - 1407 2599 - 846 1518 -
Critical Hdwy 6.44 4.12 - - 6.44 4.16 - - 7.54 6.54 7 7.54 6.54 6.96
Critical Hdwy Stg 1 - - - - - - - - 6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 - - - - - - - - 6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.52 2.21 - - 2.52 2.23 - - 3.52 4.02 3.35 3.52 4.02 3.33
Pot Cap-1 Maneuver 58 224 - - 272 552 - - ~ 8 3 458 ~ 3 3 212
Stage 1 - - - - - - - - 145 202 - ~ 30 58 -
Stage 2 - - - - - - - - 146 50 - 323 180 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 57 ~ 57 - - 501 501 - - - 0 458 - 0 212
Mov Cap-2 Maneuver - - - - - - - - - 0 - - 0 -
Stage 1 - - - - - - - - 145 0 - ~ 30 39 -
Stage 2 - - - - - - - - ~ 36 34 - - 0 -
Approach EB WB NB SB
HCM Control Delay, s 81.5 1
HCM LOS - -
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) - 458 ~ 57 - - 501 - - - 212
HCM Lane V/C Ratio - 0.121 2.441 - - 0.325 - - - 0.631
HCM Control Delay (s) - 13.9$ 807.9 - - 15.6 - - - 47.2
HCM Lane LOS - B F - - C - - - E
HCM 95th %tile Q(veh) - 0.4 14 - - 1.4 - - - 3.7
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Attachment 8
Page 73
Section VII. Item #2.
Source: Town of Bluffton website. First collected Oct 14, 2026.