CHAPIN UNIFIED ZONING & DEVELOPMENT ORDINANCE
STEERING COMMITTEE MEETING
Council Chambers, Chapin Town Hall
October 19, 2023
3:00 P.M.
AGENDA
Call to order
Freedom of Information Act Compliance
Approval of Minutes
1. October 3, 2023 Meeting Minutes
Discussion Items
2. Brief discussion of outstanding items from UDO Committee Meeting, October 3, 2023
3. UDO Draft Report
4. Unified Zoning and Development Ordinance draft review
a. Article 10: Development Review Procedures
b. Article 11: Nonconformities
c. Zoning Map
Adjourn
TOWN OF CHAPIN
UNIFIED DEVELOPMENT ORDINANCE COMMITTEE
MEETING MINUTES
Tuesday October 3, 2023 Town Hall
3:00 P.M.
Members Present: Planning Commission Members Rae Davis, Caleb Pozsik (arrived at 3:11 p.m.), Clay Cannon, Josh
Edwards
Members Absent: Yvonne Hudson
Staff Present: Planning and Zoning Manager Kevin Singletary, Town Clerk Shannon Bowers, Town Administrator
Nicholle Burroughs (arrived at 3:12 p.m.)
Staff Absent: Mayor Al Koon
Call to Order: Chair Davis called the meeting to order at 3:04 p.m. She then determined there was a quorum and
acknowledged the appropriate notifications in compliance with the SC Freedom of Information Act had been met.
Approval of Minutes: Member Cannon moved to approve the September 21, 2023 meeting minutes as presented.
Member Edwards seconded the motion. No further discussion, motion passed unanimously.
Chair Rae Davis: Yes
Member Clay Cannon: Yes
Member Josh Edwards: Yes
Discussion Items
Outstanding items from UDO Committee Meeting, September 21, 2023:
The UDO Committee addressed several outstanding items from the previous meeting, which included articles 5,
7, and part of 8: where to allow above ground utilities, crosswalks (materials and PC review), street section
table (to include Lexington County/SCDOT standards in addition to what the Town requires), separating
requirements for multi-family developments for clarity, access points and spacing to reflect authority holding
jurisdiction standards, open space percentages in each zoning district, and traffic analysis language to set
groundwork for future planning mechanisms. Mr. Singletary, Administrator Burroughs, and Mr. Gianni will
discuss specific details and bring back to the UDO Committee for review.
Unified Zoning and Development Ordinance Review: Article 8: Parking and Loading:
The UDO Committee then continued discussion on article 8. Items discussed were: off street parking, language to allow
Town to review on street parking, internal connections, and administrator authority.
Article 9: Signs:
The UDO Committee discussed making sign requirements more restrictive; sign materials (removing cabinet signs and
internal illumination), including external illumination, and permitting for temporary signs/banners, and violations for
unauthorized signs.
Article 12: Violations and Enforcement:
The UDO Committee discussed amending language in article 12 to be clear and consistent throughout the document.
Administrator Burroughs suggested an attorney review for correct language of this article.
Unified Development Ordinance Committee October 3, 2023
Before adjournment, Mr. Singletary noted that the next UDO Committee meeting would be on October 19, 2023 and that
he will be leaving employment with the Town by the end of the month. Administrator Burroughs stated that the next steps
forward would include a full review and recommendation to the Planning Commission.
Adjournment: Member Cannon moved to adjourn the meeting. Vice Chair Pozsik seconded the motion. Meeting was
adjourned at 5:02 p.m.
UDO COMMITTEE APPROVED (Date):
Rae Davis, PC Chair
ATTEST:
Shannon Bowers, Town Clerk
Nicholle Burroughs, Town Administrator
RE: UDO PROJECT – TOWN OF CHAPIN
October 17, 2023
Page 1
October 17, 2023
Nicholle Burroughs
Town Administrator
157 Columbia Avenue
Chapin, SC 29036
RE: UDO FINAL DRAFT
UDO DEVELOPMENT — TOWN OF CHAPIN
MRB GROUP PROJECT NO. 3950.220015.000
Dear Ms. Burroughs:
After a draft UDO was submitted to the Town earlier this year, the Town conducted a full
review of the UDO and provided us with valuable feedback, comments, and concerns.
This report will highlight the most significant ch anges and e dits to t he UDO since
receiving comments from the Town regarding the final draft.
I. Highlights of Edits
This section will go through each section in order to highlight the most notable
comment. Where applicable, the section number or section will be cited.
• Article 3
• All mentions of flag pole s have been moved to Article 9 (Section
9.7.2.a.12), signs, as it was felt that a central location was needed
that listed all the requirements for flag poles . Permitted flag heights
depend on the location in which the flag is located.
• Article 4
• An important concern was stated regarding multi-family uses. It is
important to be inclusionary of all u ses to comply with state and
federal law, but also important to recognize the existing scale an d
compatibility with neighborhoods. The conditional use standards for
multi-family uses ( Section 4.4.2.f) have been modified to refl ect the
vision for the town . Each zoning district that allows multi-family now
has a density cap within each zoning district, as suggested by the
Town.
Nicholle Burroughs, Town Administrator
RE: UDO PROJECT – TOWN OF CHAPIN
October 17, 2023
Page 2
• Article 5
• Clarified language around the “applicability” section. Added
specific language in the comment section clarifying what all will be
captured by article 5.
• Eliminated language p ertaining to specific right-of-way and lan e
widths as it was causing confusion , and was a direct copy from the
Lexington County engineering standards . All new r oads w ill be
reviewed and approved by either Lexington County or SCDOT, as the
Town does not have a road department or the intent to start
accepting roads.
• A comment was received regarding off-site improvements within the
Traffic Impact Study section. Since the Town does not have a traffic
engineer, nor will be accepting the maintenance of new roads, it is
not within the Town ’s power to control off -site improvements to a
street. SCDOT (and potentia lly Lexington County ) have trip
generation thresholds when off-site improvements are required.
• Open space standards have bee n revised to reflect developments
that are more feasible in Chapin. For example, a new column states
the open space requ irements for projects that affect less than an
acre. In addition, in those areas where the greatest density of housing
and commercial uses are located ( in TC, VC, TR3, and TR2 ), open
spaces are required. Further dow n in the article is a section that
defines different open space types that are acceptable.
• Article 7
• Revised the buffer table to reflec t zoning district as well as use
categories (from Article 4 Use Table) to ensure that the most sensitive
uses (residential ) are buffered from those zoning districts or use
categories that can have the most negative affect.
• Relocated tree coverage requirements and fixed references
• Article 9
• In addition to the change to flags and flag poles. Several standards
from around the state were used to verify that the existing standards
for temporary political signage conform to SC State Code. There is
not a size threshold for political signs
• For internally illuminated cabinet and letter signs, we have provided
alternate language in the illumination section at the beginning of this
section, that would prohibit this type of signage. Whichever direction
the Town chooses , we can reflect those c hanges within the
document.
Nicholle Burroughs, Town Administrator
RE: UDO PROJECT – TOWN OF CHAPIN
October 17, 2023
Page 3
• Article 10
• Clarified what “actual notice ” of decisions and re -hearings within
section.
• Differentiated between published and posted noti ces, as legal ad s
and signage respectively.
• Several comments were made stating that the application processes
should be formatted in similar manner , as sub sections between
subdivision, architectural review, and text amendment differ. After a
couple of tries trouble shooting, these subsections do not align in a
replicable format as they are substantially different processes that
require different review documents at different stages. For example,
the ARB would require preliminary elevations or construction
documents, rather than a preliminary plan, which the Plan ning
Commission reviews first in subdivision applications.
These comments and revisions are reflected in the documents and have been provided
to the Town so that the final draft can continue move towards the Planning Commission
review, and the eventual adoption by Town Council. We hope that these revisions are
clear and understandable so that the community can work to achieve the goals within
the Comprehensive Plan.
Sincerely,
Riccardo Giani
Senior Planning Associate
8/17/23 MRB Draft version 5 – RG. KS Notes.
Article 10 – Development Review Procedures
10. Development Review Procedures
10.1. Purpose and General Standards
The purpose of the Development Review Procedures Article is to provide a clear,
transparent, and comprehensive development process that is fair and equitable to all
interested Parties, effected neighbors, Town Officials, related Agencies, and Town
Council. This Article will establish an orderly process for the responsible growth,
development, revitalization, and expansion of property, lands, and areas within
jurisdictional control of the Town of Chapin.
10.1.1. Applicability
The provisions of this Article shall be applicable to all development activities
under the jurisdiction of the Town of Chapin.
10.1.2. Conformity with Ordinance
The Administrator shall not issue a Permit or License for any Occupant Use,
Structure, or Intended Purpose that conflicts with any provision of this
Ordinance. Any Permit, License or Certificate of Occupancy issued found to be in
conflict with the provisions of this Ordinance, whether intentionally or
unintentionally, shall be null and void.
10.1.3. Public Notice
In accordance with all applicable State of South Carolina Laws, all applications
requiring a Public Hearing before the Planning Commission (PC), Board of Zoning
Appeals (BZA), Architectural Review Board (ARB), and/ or Town Council (TC),
shall adhere to the following requirements:
a. Advertised Notice: All meetings of the Planning Commission (PC), Board of
Zoning Appeals (BZA), and Architectural Review Board (ARB) shall be
published in a newspaper of general circulation within the Town and/or
public notice medium and shall be posted on, or adjacent to, the property
affected, with at least one (1) notice visible from each public street abutting
or adjoining the property fifteen (15)-calendar days prior to the Public
Hearing. Posted notice(s) shall contain the property address, parcel
number, type of application, and contact phone number.
b. Posted Notice: Agendas for regularly scheduled meetings must be
conspicuously posted on a bulletin board in a publicly accessible place at the
office or meeting place of the public body and on a public website
maintained by the governing body and/or Town at least 24 hours prior to
said meetings.
10.1.4. Written Notice of Decisions
Written copies of all final judgments and/or determinations made by any Board
and/or Zoning Administrator shall be mailed via United State Postal Service to
the Applicant or Appellant within ten (10)-calendar days following the date a
Deleted: Zoning
Deleted: <#>Property Posting: Notice of
Application signage shall be posted on subject
property in a clearly visible/ conspicuous location
that can be viewed from each street adjacent to
the subject property. Signage will be posted by the
Zoning Administrator and/ or Town Staff.¶
8/17/23 MRB Draft version 5 – RG. KS Notes.
judgment and/or determination was rendered. Copies of all judgments and/or
determinations shall be filed within Town Offices and available for public
viewing during normal business hours.
10.1.5. Time Limits for Resubmission of Application
If an application is denied or disapproved as a result of this/ an Ordinance for
any reason, an application for similar and/or identical requests shall not be
refiled for a period of one (1) calendar year from the advertised Public Hearing
date. Upon petition by the Applicant or Appellant, the Administrator may
permit a refiling of an application no sooner than six (6) months from the
original Public Hearing date. Where Public Hearings are not required,
applications shall not be refiled for a period of one (1) calendar year from the
date of the Notice of Denial.
10.2. Application Procedures
10.2.1. Pre-Application Conference
A mandatory pre-application conference with the Administrator shall be
conducted prior to the filing of any application requiring review by the PC, BZA,
ARB, or TC.
10.2.2. Application Forms and Fees
Prior to application processing, an application provided by the Town must be
completed and accompanied with all required fees, payable to the “Town of
Chapin”, and accompanied by any required documentation, information, and/or
plans. An application may be considered incomplete by the Administrator if any
of the above have not been provided. The Administrator may not process any
applications that are incomplete. Fees for applications are set by the Town
Council and are subject to change by resolution adopted by Town Council.
10.2.3. Application Deadline
All applications shall be completed and submitted to the Administrator in
accordance with schedules as determined by the Town.
10.3. Application Requirements
The following general standards for various applications are intended to require only
that data/information that is necessary to render an informed decision by the reviewing
agency.
10.3.1. Application Elements Descriptions
a. Site Analysis: A site analysis is intended to identify the existing conditions of
the property in the form of a survey prepared by a licensed South Carolina
surveyor. Depending on the application and determination of the
Administrator, a site analysis may include the following, tree survey to
include the species and diameter at breast height (DBH) of existing trees
and their location, vegetative boundaries, clear and open areas, topography,
existing watercourses, floodplains, federal or state recognized endangered
species habitats, and areas of historic, cultural, or archeological significance.
This requirement provides the Town and the applicant the ability to
Deleted: Zoning
Deleted: Zoning
Deleted: Public Hearings
Deleted: An optional pre-application meeting with
the Zoning Administrator for all other applications is
not required; however, is highly recommended.
Deleted:
Deleted: Zoning
8/17/23 MRB Draft version 5 – RG. KS Notes.
evaluate the proposed development in order to preserve existing resources
and to improve the appearance of the development proposed. It is the
expectation that readily available spatial data, including GIS information,
will be sufficient for this survey.
b. Sketch Plan: The sketch plan shall show in simple line drawing (at a scale of
not less than one-inch equals one mile) form the proposed layout of streets,
lots, buildings, civic spaces, tree coverage, and other features in relation to
existing conditions, based upon the size of the tract proposed for
development.
c. Development Phase Plan: The Development Phase Plan or Plans shall show
the different section of the development that are planned for phasal
construction. Phase Plans shall use either Arabic numerals, roman numerals,
or the English alphabet to denote different phases. Phases should be listed
in numerical or alphabetical order in correspondence with the order of
planned phase development. If a development has multiple types of phase
plans, such as utility/infrastructure phase plan, and lot development phase
plan, and the phases do not correspond to the same areas, then a different
denotation shall be used for each.
d. Site Plan (syn. Preliminary Plat): The site plan is intended to provide a
detailed two dimensional drawing that illustrates all of the required site
features, including buildings*, parking areas*, street locations, street
sections, rights-of-way, property lines and setbacks, required or proposed
Critical Area buffers, trees proposed to remain and to be removed and tree
protection zones, site landscaping and lighting* (in conceptual form), and all
related development calculations (e.g., density, proposed building areas,
number of parking spaces, estimated impervious surface, proposed tree
coverage, percentage of open space, and Traffic Impact Study) in sufficient
detail to show compliance with this Ordinance. *When a Site Plan is being
used as a Preliminary Plat for a Subdivision, these elements are not required
to be shown.
e. Construction Documents: The construction documents for development
design review and subdivision plans shall constitute a full and complete set
of engineered drawings necessary for final permitting and horizontal and
vertical construction. This includes detailed landscaping plans, lighting plans,
road specifications, cross-section of street pavements, grading and drainage
plans, utility plans, and stormwater calculations. Review of these
documents shall be conducted by the authorized entity and agent having
jurisdiction.
f. Final Plat: The final plat shall be prepared by a registered land surveyor
licensed to practice in the State of South Carolina, and shall meet the
requirements of the Beaufort County Register of Deeds Office. The Final Plat
shall constitute an accurate survey of the entire phase as shown on the
approved site plan and shall include all the relevant notes and certifications.
Formatted: No underline
8/17/23 MRB Draft version 5 – RG. KS Notes.
g. As-Built Drawings: The as-built drawings shall show the final installed
conditions and specifications for all public infrastructure. The designer of
the infrastructure shall certify, under seal, that the installed infrastructure is
in compliance with the approved plans and designs and with the
requirements of this Ordinance and receives approval from other agencies
having jurisdiction.
h. Building Elevations For Design Review: For certain applications, it may be
necessary to submit scaled drawings of each elevation visible from a public
street, civic space, property lines, cardinal directions, or any orientation of
the building(s). These drawings shall be in color and shall accurately
represent the building heights, floor levels, and building materials, and shall
include written identification of building materials and colors. In addition,
the Administrator may require a physical model, material boards, and/or up
to three drawings from different perspectives that show how the building
fits into the context of the block.
10.4. Zoning Permit
10.4.1. Applicability
a. No building, sign and/or structure shall be erected, moved, relocated,
enlarged, altered or demolished in the jurisdiction of the Town of Chapin
without a zoning permit issued by the Administrator. No occupation of an
existing structure by a new user and/or change in use type (regardless of
use) is permitted without a zoning permit issued by the Administrator. No
permit shall be issued by the Administrator except for a use which is in
conformity with the provision of this Ordinance
b. Home Occupations
c. Converting a residential building to a non-
residential use
d. Approval of permitted temporary uses
e. New Construction, additions, alterations, and
modifications to existing buildings and sites,
with applicable approvals from all authorities
having jurisdiction.
f. Expansion of use
10.4.2. Process and Approval
a. Process Type: Administrative
b. Pre-Application Procedure: Encouraged
c. Required Application Information: Property and
applicant address, zoning information, property
authorization, survey, scope of project, and/or
other documents required by the administrator.
d. Public Notification: None
e. Appeals: Appeals of zoning permit applications
denied by the Administrator shall be submitted
Application
Submittal
Completeness
Review
Compliance
Review
Administrator
Final Action
Appeal to BZA
(if necessary)
Deleted: Zoning
Deleted: or for a use authorized by order of the
Board of Zoning Appeals.
Deleted: <#>Tree Removal
Deleted: <#>¶
Deleted: <#>Verification of an existing or
proposed use ¶
Compliance inquiries regarding existing properties
and ongoing or completed projects.
Deleted: <#>¶
8/17/23 MRB Draft version 5 – RG. KS Notes.
to the Board of Zoning Appeals within 30 days of the decision (Section
10.13)
f. Permit Validity: Upon the approval of the zoning permit, the applicant shall
have 6 months act on the approval. If no action is taken, the permit
becomes null and void, and the applicant shall resubmit.
g. Permit Extension: The Administrator may grant a single extension of up to 6
months upon submittal by the applicant of sufficient justification for the
extension.
10.5. Architectural Review, Minor
10.5.1. Applicability: A Certificate of Appropriateness (Minor) from the Administrator
shall be required for the following construction
activities:
a. Repairs, replacements, or renovations of
existing buildings, as long as there is no
change in exterior materials or does not
involve modification of architectural
features.
b. Expansions of existing buildings of less than
20 percent of the building’s gross floor area
c. New construction of non-residential
accessory uses, except for those provided
in this Section (10.5.1.).
d. Demolitions of any structure
e. New construction of fences or walls for
non-residential or multi-family uses
f. Any color change to the exterior of a
building within an Architectural Overlay
Districts. (See Appendix III for Approved
Colors)
10.5.2. Process and Approval
a. Process Type: Administrative
b. Pre-Application Procedure: Encouraged
c. Required Information: Site Analysis, Site
Plan, and Building Elevations for Design Review (See Section 10.3.1) – these
may be waived by Administrator as appropriate. The Administrator may
require additional documents.
d. Public Notification: None
e. Issuance of COA: After the Administrator has determined that the
application conforms with the Ordinance, a Minor Certificate of
Appropriateness will be issued to the applicant.
f. Appeals: Appeals of the Administrator shall be heard by the Architectural
Review Board. Application for appeal shall be made within 30 days of the
decision.
Pre-Application
Meeting/Application
Submittal
Compliance Review and
Report. (Modifications
and Re-submission if
necessary)
Administrator Final
Action (Proceed to
Project Permit)
Appeal to Architectural
Review Board (if
necessary)
Deleted: the
Deleted: <#>Any application that the
Administrator deems significant, requiring approval
by the Architectural Review Board ¶
Formatted: No underline
8/17/23 MRB Draft version 5 – RG. KS Notes.
g. Permit Validity: Upon the approval of the Minor Certificate of
Appropriateness application, the applicant shall have 2 years to obtain a
Project Permit. Failure to secure Project Permits for the permitted work
within this time shall render the compliance void. Any change to the
approved plans that has not been authorized by the Administrator shall
invalidate the Minor Certificate of Appropriateness and any subsequent
Project Permits.
h. Permit Extension: The Administrator may grant up to one (1), one-year
extensions of this time period upon submittal by the applicant of sufficient
justification for the extension. Extensions shall be submitted at least 45 days
prior to the expiration date of the vested rights period in Section 10.15.
10.6. Architectural Review (Major)
10.6.1. Applicability: In the areas designated as
Architectural Overlays Districts, a Certificate of
Appropriateness issued by the Architectural
Review Board, (Section 6.2.1 – Overlay District
Map) shall review the following applicable
development:
a. Any new construction of a nonresidential,
mixed-use, three-family, or multi-family
building or any structure exceeding 10,000
sq.ft. in gross floor area within the overlay
districts established in Article 6.
b. Any modification, addition, or demolition to
a building on the National Register of Historic
Places.
c. Any new construction, or conversion of an
existing building, to a drive-thru
establishment.
d. Expansion of non-residential or multi-family
buildings by 20 percent or more of the
building’s area or floor space. Except in the
Light Industrial District (LI).
e. Any modifications to the building exterior of a non-residential or multi-
family building.
f. Any residential building models to be used in a proposed major subdivision
(Section 10.9).
g. Any application not specifically described as “minor” by Section 10.6.1.
h. Any application that the Administrator deems significant, requiring Approval
by the Architectural Review Board.
10.6.2. Process Type: Board Review
Pre-Application Meeting
Application Submittal
and Completness
Review
Public Notification,
Report to ARB, and
Public Hearing
ARB Review and
Decision. Mofications
and resubmittal as
necessary
Appeal - Circuit Court
(if necessary)
Deleted: o
Deleted: d
Deleted: <#>Any new or converted multi-family
residential building
Deleted: <#>¶
Deleted: <#>single-family or two-family
Deleted: <#>Variances to the design requirements
within Article 6 shall be reviewed by the ARB for a
recommendation first, prior to variance review by
the BZA as detailed in Section 10.12.¶
Deleted: Public Hearing
8/17/23 MRB Draft version 5 – RG. KS Notes.
10.6.3. Pre-Application Procedure: Required. Every applicant for a Major Architectural
Review is required to meet with the Administrator prior to the submittal of an
application. The purpose of this meeting is to provide clarification and
assistance in the preparation and submission of plat for approval. It is
recommended that the applicant provide a Sketch Plan (Section 10.3.1.b) to the
Administrator prior to or at the pre-application conference. The provision of a
sketch plan will allow the Administrator an opportunity to review the proposal
before the applicant expends funds on the preparation of a detailed Site Plan.
10.6.4. Required Application Information: Site Analysis, Sketch Plan, Site Plan,
Construction Documents, As-Built Drawings, Building Elevations for Design
Review. A digital copy in a Portable Document Format (PDF) of the plat are
required upon submission, the administrator may also request for physical
copies for the purposes of distribution to the applicable review entity. The
Administrator may also require the submittal of a letter from a licensed traffic
engineer certifying that the proposed subdivision complies with SCDOT, County,
and Local (Section 5.6) regulations regarding a Traffic Impact Study (TIS).
10.6.5. Determination of Completeness: The Administrator shall review the application
to ensure that it is complete, prepare a report and recommendation on the
application, and schedule the matter for review by the Architectural Review
Board.
10.6.6. Public Meeting: The Architectural Review Board shall hold a public meeting on
the proposal. The applicant may present the proposal to the Board.
10.6.7. Decisions/Findings of Fact: Following review, the Architectural Review Board
may approve, deny, or approve with conditions the application for a Certificate
of Appropriateness. No Certificate of Appropriateness shall be issued unless the
following findings of fact can be made:
a. The plan and design of the proposed is consistent with the adopted plans
and policies of the Town, and complies with all applicable requirements of
Article 6 within this Ordinance.
b. Scale, location, form, line, color, texture and other design elements of
building structures, and signs are in harmony with the character of the
district;
c. Proposed development does not adversely impacts surrounding property
values by reason of factors subject to architectural review.
10.6.8. Time Frame for Review: Major Architectural Review applications shall be acted
upon within 60 calendar days after filing; otherwise, the application shall be
deemed approved, and a COA shall be issued by the Administrator. An
extension of time may be granted by mutual consent of the Architectural
Deleted: a public
Deleted: before
Deleted: <#>Public Notification: Public notice of all
hearings shall be published in a newspaper of
general circulation within the Town and shall be
posted on, or adjacent to, the property affected,
with at least one notice visible from each public
street abutting the property fifteen (15) days prior to
the public hearing.¶
Deleted: and other property owners likely to be
materially affected by the application shall be given
an opportunity to be heard.
Deleted: the public meeting
Deleted: the
Deleted: shall be
Deleted: which
Deleted: shall not be approved
Deleted: permit
8/17/23 MRB Draft version 5 – RG. KS Notes.
Review Board and the applicant. At the time of approval, the applicant shall be
directed to prepare detailed Construction Documents compliant with the terms
of approval and submitted to the agency having the authority to issue the
applicable permits.
Issuance of a COA: After the ARB has determined that the application makes
the findings in compliance with Section 10.6.8 above, they will grant an
approval of the application, with or without conditions, and direct the
Administrator to issue a Major Certificate of Appropriateness.
10.6.9. Appeals: Any party aggrieved by the decisions of the Architectural Review
Board may appeal to the Circuit Court of Lexington County within 30 days of
the decision.
10.6.10. Permit Validity: Upon the approval of the Major Architectural Review
application, the applicant shall have 2 years to obtain a construction permit
from the agency having authority and jurisdiction. Failure to secure a permit
for the permitted work within this time shall render the compliance void. Any
change to the approved plans that has not been authorized by the
Administrator shall invalidate the design approval, and any subsequent
building permits.
10.6.11. Permit Extension: The ARB may grant up to one (1), one-year extensions of this
time period upon submittal by the applicant of sufficient justification for the
extension. Extensions shall be submitted at least 45 days prior to the expiration
date.
10.7. Subdivision Review
10.7.1. Applicable to all subdivisions: All development that involves the subdivision of
one or more parcels shall be subject to the subdivision approval requirements of
this Article, with the following exceptions:
a. Subdivision of land into parcels having existing access of less than 5,000
square feet in area when they are exclusively for the provision of local
utilities such as pump stations.
b. The combination or recombination of entire lots of record where no new
street or change to existing streets is involved.
c. Combination or recombination of portions of previously platted lots where
the total number of lots is not increased and the resultant lots are equal to
the ordinance standards.
10.7.2. Land Development Standards: See Article 5 for applicability of land
development standards.
10.7.3. Unlawful to Record Plat without Town Approval: It shall be unlawful to offer
and cause to be recorded any plan, plat, or replat of land within the
jurisdictional authority of the Town of Chapin with the appropriate County
Register of Deeds office having jurisdiction, unless the same bears the
endorsement and approval of the Town.
Deleted: <#>The division of land into parcels of 5
acres or more where no new street is necessitated
and/or created.
Deleted: <#>¶
8/17/23 MRB Draft version 5 – RG. KS Notes.
10.7.4. Appeals
a. Subdivision Plat decisions made by the Planning Commission (PC) may be
appealed to the circuit court within 30 days of the decision.
b. Subdivision Plat decisions made by the Administrator may be appealed to
the PC within 30 days of the decision. The PC shall review the Subdivision
Plat within 60 days and shall have all of the same authority as the
Administrator in such review. The decision of the PC shall be final.
10.7.5. Permit Validity: After approval of a subdivision, the
applicant shall record the approved final plat with at
the Lexington County Register of Deeds Office prior to
the expiration of the vested rights period (Section
10.15)
10.7.6. Subdivision in Phases: Whenever part of a tract is
proposed for platting, and it is intended to subdivide
additional parts in the future, or abutting land is in the
same ownership, a sketch plan for the entire tract shall
be submitted with the plat.
10.8. Minor Subdivision
10.8.1. Applicability: The Minor Subdivision review process is
allowed for those divisions of land that:
a. Combine or recombine portions of previously
platted lots where the total number of lots is not
increased and the resultant lots are equal to the
standards of this code. A nonconforming lot may
be included in a lot recombination if the resultant lot becomes closer to
conformity.
b. Subdivide parcels less than 5 acres in size.
c. Create no new streets nor require the extension or new installation of
public utilities.
d. Does not involve any other conditions that require any additional
approval(s) from any Town board or commission, as determined by the
Administrator.
Application
Submittal
Completeness and
Compliance
Review by Staff
Administrator:
Final Decision
Appeal to Planning
Commission
(if necessary)
Deleted: the
8/17/23 MRB Draft version 5 – RG. KS Notes.
e. Subdivisions resulting in four or less total
lots, unless it requires the creation of a new
street to establish access, and is not part of a
phased development.
f. Subdivisions affecting property that have
been created within the last calendar year
from the date the original date record.
10.8.2. Process Type: Administrative
10.8.3. Required Application Information: A preliminary
plat as described in Section 10.3.1.C. A digital
copy in a Portable Document Format (PDF) of the
plat are required upon submission, the
administrator may also request for physical
copies for the purposes of distribution to the
applicable review entity. The Administrator may
also require the submittal of a letter from a
licensed traffic engineer certifying that the
proposed subdivision complies with SCDOT,
County, and Local (Section 5.6) regulations
regarding a Traffic Impact Study (TIS). The
Administrator may require additional documents.
10.9. Major Subdivision
10.9.1. Applicability: Any division of land that does not
meet all of the requirements for Minor
Subdivision (Section 10.7.2.a). The following
types of development, include but are not limited
to, require Major Subdivision Approval:
a. Commercial subdivisions requiring new
streets, infrastructure, and other
development applications referenced in
Section 5.2.1.
b. Conservation Subdivision
c. Manufactured Home Park
d. Planned Developments
e. Commercial or Industrial Subdivisions
f. All subdivision applications may be elevated
to review by the Planning Commission as
determined by the Administrator.
g. Not listed as “Minor” in Section 10.8.1 or otherwise reference as needing Major
Subdivision Approval within this Ordinance.
10.9.2. Process Type: Commission Review. for Sketch Plan approval, followed by review by the
Planning Commission for preliminary plat approval
10.9.3. Public Notification: None
Pre-application Conference
Sketch Plan Application
Submittal
Completeness and Compliance
Review by staff and outside
agencies
Approval of Sketch Plan by
Administrator
Preliminary Plat to Planning
Commission with construction
documents
Staff Report and Review by
Planning Commission
Approval of Preliminary Plat by
Planning Commission and
outside agencies
Submittal of Final Plat with as-
built drawings
Approval of Final Plat by
Administrator
Deleted: of
Deleted: Administrative
8/17/23 MRB Draft version 5 – RG. KS Notes.
10.9.4. Sketch Plan Review
a. Procedure: The subdivider shall submit to the Administrator, a completed
application, a digital copy in a Portable Document Format (PDF) of the plat
are required upon submission, the administrator may also request for
physical copies for the purposes of distribution to the applicable review
entity.
b. Review By Staff: The Administrator shall review the submitted sketch plan
to determine conformance with this Ordinance. The Administrator may also
require the submittal of a letter from a licensed traffic engineer certifying
that the proposed subdivision complies with SCDOT, County, and Local
(Section 5.6) regulations regarding a Traffic Impact Study (TIS).
c. Approval of Sketch Plan: After reviewing the Sketch Plan, the Administrator
will advise the applicant within thirty (30) days after application that the
Sketch Plan is approved, disapproved, or approved with certain
modifications. If approved, said approval shall constitute authorization to
prepare and submit a Preliminary Plat. Approval does not authorize the
developer to begin the proposed construction or improvements. If the
Administrator fails to act on the Sketch Plan within thirty (30) days after
application, the Sketch Plan shall be deemed approved and a certificate, to
that effect, shall be issued by the Planning Commission upon demand;
provided, however, that the subdivider may waive this requirement and
consent in writing to extension of such period.
10.9.5. Preliminary Plat
a. Procedure: Upon approval of the Sketch Plan (Section 10.7.3.D), the
subdivider shall submit to the Administrator one (1) physical copy and a
digital copy in a Portable Document Format (PDF) of the plat are required
for the preliminary plat along with an application available at the office of
the Administrator. The Administrator may also require the submittal of a
letter from a licensed traffic engineer certifying that the proposed
subdivision complies with SCDOT, County, and Local (Section 5.6)
regulations regarding a Traffic Impact Study (TIS). Additional physical copies
of the plat or any supplemental information may be requested.
b. Review by Outside Agencies: Upon determination by the Administrator that
the Preliminary Plat and construction documents conforms with the
approved Sketch Plan, the Administrator shall submit an appropriate
number of copies of the preliminary plat and construction documents to
applicable outside agencies for review and approval:
1. Director of Utilities or Appropriate Utility AHJ
2. Appropriate soil & erosion control agency
3. South Carolina Department of Health & Environmental Control
4. Appropriate Road AHJ
Deleted: Zoning
Deleted: <#>Director of Engineering and Planning¶
Deleted: <#>Director of Parks, Streets, and
Sanitation¶
8/17/23 MRB Draft version 5 – RG. KS Notes.
c. Review by Planning Commission: The PC shall approve, approve with
conditions, or disapprove the preliminary plat within sixty (60) days of
receipt of preliminary plat. Unless this time limit is extended by mutual
agreement, failing to act within the time limit constitutes approval of the
preliminary plat. If a proposed Site Plan (preliminary plat) is determined by
the PC to be in conformance with the sketch plan and all applicable
provisions of this Ordinance, the PC shall approve the Site Plan, and shall
advise the applicant in writing of:
1. The conditions of such approval, if any;
2. Approval of Preliminary Plat by the Town; and
3. The date on which the PC granted approval.
10.9.6. Final Plat
a. Procedure: Following the approval of the Preliminary Plat and completion
of all required improvements, if the improvements are not going to be
bonded, the applicant shall file with the Administrator as application for
final approval of a subdivision plat. If improvements are going to be
bonded, the requirements of Section 5.3.3 shall be met prior to the issuance
of a final plat.
b. Application Requirements: Submittal of final plat application forms
accompanied by at least two (2) physical copies and a digital copy in a
Portable Document Format (PDF) of the Final Plat with all applicable
documentation. The Final Plat shall contain as-built drawings compliant
with Section 10.3.1.6. The final plat shall be compliant with the Preliminary
Plat.
c. Review by Staff: Upon determination by the Administrator that the Final
Plat is in conformity with the Preliminary Plat as approved, the
Administrator shall submit an appropriate number of copies of the Final Plat
and As-Built Drawings to the same agencies and Town departments which
reviewed and approved the Preliminary Plat (Section 10.9.5.2). A report
from applicable agencies, as determined by the Administrator and
applicable laws, approving the as-built drawings shall be required prior to
approval.
d. Compliance with Ordinance: Land development standards (Article 5)
including performance bonds if required, in a form satisfactory to the local
government attorney and in an amount established by the Planning
Commission upon recommendation of the Administrator. The bond shall
include a provision that the principal of the bond shall comply with all the
terms of the resolution of Final Plat approval as determined by the Planning
Commission and shall include, but not be limited to, the performance of all
required subdivision and off-site improvements, and that all improvements
and land included in the irrevocable offer of dedication shall be dedicated to
the local government free and clear of all liens and encumbrances on the
premises.
Deleted: <#>Central Midlands Council of
Governments¶
Deleted: <#>after the Administrator’s approval
of the Sketch Plan…
Deleted: available at the Office of the
Administrator and be …
Deleted: Zoning
8/17/23 MRB Draft version 5 – RG. KS Notes.
e. Review by Planning Commission: If the Administrator determines that the
submitted final plat is an alteration from the approved preliminary plat,
such as a change of density, lots, street configuration, or other significant
change, the Planning Commission shall review and act on a Final Plat within
sixty (60) calendar days after the submittal of the Final Plat, unless
otherwise agreed upon by the Administrator and the applicant. No plat
shall be acted upon by the Planning Commission without affording a hearing
thereon, notice of time and place of which shall be sent by registered or
certified mail to the address provided by the applicant not less than five (5)
days before the time of the hearing.
f. Approval: Upon approval of the Final Plat by the Administrator, a statement
will be placed on the Final Plat by the Administrator and two (2) copies of
the plat returned to the subdivider stating that the subdivision plat as
shown has complied with the requirements of
the Town, and have been approved for
recording in the Officer of the Registrar of
Deeds in Lexington County.
g. Changes to Final Plat: If it should become
necessary to revise a final plat due to a
dimensional error, a revised plat shall be
submitted to the Administrator prior to final
recording to determine if the revision requires
Planning Commission review.
10.10. Administrative Adjustment
10.10.1. Purpose: Administrative Adjustments are specified
deviations from otherwise applicable development
standards where development is proposed that
would be:
a. Compatible with surrounding land uses;
b. Harmonious with the public interest; and
c. Consistent with the purposes of this Ordinance.
10.10.2. Adjustment of Numerical Standard: For administrative level applications, or
those not requiring Planning Commission and/or Town Council Review, the
Administrator shall have the authority to authorize modification of up to 10%
from any numerical standard set forth in Article 3 (District Development
Standards), Article 6 (Design Standards), Article 7 (Landscaping and Tree
Preservation), or Article 8 (Parking) of this Ordinance. For those cases before
the Planning Commission or the Architectural Review Board, the PC and ARB
may have the authority to grant a modification up to 10% for those sections
reference in within this Section 10.10.2. Any request greater than 10% shall
constitute a need for a variance request, handled by the Board of Zoning
Appeals (BZA), and subject to the requirements of Section 10.12. No
Application Submittal
Completeness and
Compliance Review
Administrator or
Planning Commission
Final Action
Appeal to BZA
(if necessary)
Deleted: has been altered
Deleted: Commission
Deleted: be treated as
8/17/23 MRB Draft version 5 – RG. KS Notes.
adjustments are permitted to sign standards. The Administrator is not
obligated to allow modification from any numerical standards.
10.10.3. Permission of Flag Lot: When the applicant is proposing flag lots or other
irregular lots as defined in this Ordinance (Article 3), the Administrator may
permit the irregular or flag lot as an Administrative Adjustment, making written
findings in accordance with Section 10.10.5.5.
10.10.4. Process and Approval
a. Process Type: Administrative
b. Public Notification: None
c. Required Application Information: An application for an Administrative
Adjustment shall include a brief description of the requirement to be
adjusted and any other material necessary to ensure the criteria in this
section are met.
d. Administrator Review: The Administrator shall review the application and
approve, approve with conditions, or deny the application, based upon the
criteria in Section 10.10.4.e. A written decision including affirmative findings
on the criteria set forth below shall be transmitted to the applicant.
e. Administrative Adjustment Criteria: To approve an application for an
Administrative Adjustment, the Administrator shall make an affirmative
finding that the following criteria are met:
1. Granting the Administrative Adjustment will ensure the same general
level of land use compatibility as the otherwise applicable standards.
2. Granting the Administrative Adjustment will not materially and
adversely affect adjacent land uses and the physical character of uses in
the immediate vicinity of the proposed development because of
inadequate buffering, screening, setbacks, and other land use
considerations.
3. Granting the Administrative Adjustment will not adversely affect
property values in any material way.
4. Granting the Administrative Adjustment will be generally consistent
with the purposes and intent of this Ordinance.
5. Granting the Administrative Adjustment shall not establish a precedent
that would generally result in the relaxing of the requirements of this
ordinance.
6. The purpose of the adjustment request is to lessen/reduce the cost of
development solely.
f. Appeals: A decision denying an Administrative Adjustment may be appealed
to the BZA within 30 days of the Administrator’s decision in accordance with
Section 10.13 (Administrative Appeals).
g. Expiration and Lapse of Approval: Property owners shall have 6 months
from the date of approval of an Administrative Adjustment to secure a
Necessary Permit(s) and/or approval(s) to carry out the proposed
improvements. It is the responsibility to notify the Zoning Administrator in
writing, when they have obtained any necessary permit(s) and/or
Deleted: varied
Deleted: BZA
Deleted: Building
Deleted: building
8/17/23 MRB Draft version 5 – RG. KS Notes.
approval(s) from the jurisdiction having authority, proving they are acting
upon the Administrative Adjustment within 6 months. If a complete Permit
and/or approval application(s) have not been filed within 6 months of the
date of approval of adjustment, the approval shall be void.
10.11. Special Exception
10.11.1. Applicability
Special Exceptions may be made for situations in which proposed land uses are
generally compatible with the land uses permitted by-right in a district but
require individual review of their location, design,configuration, and other
criteria to evaluate the potential for adverse impacts on adjacent property and
uses. The Special Exception process ensures the appropriateness of the use at a
particular location within a given District.
10.11.2. Process and Approval
a. Process Type: Public Hearing by Board
of Zoning Appeals
b. Required Application Information: All
applicable forms as determined by the
Administrator, along with such
accompanying material as is required
to ensure compliance with the criteria
listed in Section 10.11.3.
c. Public Notification: Public notice of all
hearings shall be published in a
newspaper of general circulation
within the Town and shall be posted
on, or adjacent to, the property
affected, with at least one notice
visible from each public street abutting
the property fifteen (15) days prior to
the public hearing.
d. Staff Review and Report: The Administrator shall prepare a staff report that
reviews the proposed development in light of the Comprehensive Plan, the
review criteria listed below, and the requirements of this Code. A copy of
the report shall be provided to the Board of Zoning Appeals (BZA) and the
applicant before the scheduled hearing.
e. BZA Hearing
1. The BZA shall hold a public hearing on the Special Exception application.
2. After review of the application and the public hearing, the BZA shall
make a written finding and approve, approve with modifications or
conditions, or disapprove the request.
3. If approval, or approval with modifications or conditions, is granted, the
decision shall be communicated in writing within 15 days to the
Application Submittal and
Completeness Review
Schedule Public Hearing and
Public Notification
Staff Report to BZA
BZA Hearing and Decision.
Resubmission for more
information (if necessary)
Appeal to Circuit Court (if
necessary)
Deleted: Building
Deleted: has
Deleted: and
8/17/23 MRB Draft version 5 – RG. KS Notes.
applicant, and the applicant shall then be authorized to submit any
necessary permit(s) and/or application(s) consistent with this
Ordinance.
10.11.3. Special Exception Review Criteria: The BZA may approve an application for a
Special Exception where it reasonably determines that there will be no
significant negative impact upon residents of surrounding property or upon the
general public. The BZA shall consider the following criteria in its review:
a. The proposed uses compatibility with existing land uses in the surrounding
area;
b. The harmony of the proposed site plan, circulation plan, and character of
the surrounding area;
c. The likely impact on public infrastructure — such as roads, parking facilities,
and water and sewer systems —and on public services — such as police and
fire protection and solid waste collection— and the ability of existing
infrastructure and services to adequately service the proposed use without
negatively impacting existing uses in the area and in the Town;
d. The general conformity of the proposed use and designs with the Town’s
Comprehensive Plan, and any other plans officially adopted by the Town;
e. The likely impact on public health and safety;
f. The potential creation of noise, lights, fumes, dust, smoke, vibration, fire
hazard, or other injurious or obnoxious impacts.
10.11.4. Conditions: The BZA may impose such conditions and restrictions upon the
application as may be necessary to minimize, mitigate, or remove any potential
adverse impacts of the proposed use.
10.11.5. Appeal: Any party aggrieved by the decisions of the BZA may appeal to the
circuit court within 30 days of the decision.
10.12. Variance
10.12.1. Variances to all ordinance standards may be requested with the following
exceptions:
a. No variances to the Table of Permitted Uses shall be permitted.
b. No variances to sign regulations shall be permitted
c. Design Exceptions (Article 6) shall be considered by the Architectural Review
Board for recommendation prior to appearing before the BZA for a variance.
Deleted: development
Deleted: ;
Deleted: City
Deleted: .
Deleted: or
Deleted:
8/17/23 MRB Draft version 5 – RG. KS Notes.
10.12.2. Process and Approval
a. Process Type: Public Hearing by the Board of Zoning Appeals (BZA).
b. Application Requirements: All applicable forms as determined by
Administrator, along with such accompanying material as is required to
ensure compliance with the criteria listed in Section 10.12.4.
c. Staff Review and Report: The Administrator shall prepare a staff report that
shall be provided to the applicant or appellant and the BZA before the
scheduled hearing.
d. Public Notification: Public notice of all hearings shall be published in a
newspaper of general circulation within the Town and shall be posted on, or
adjacent to, the property affected, with at least one notice visible from each
public street abutting the property fifteen (15) days prior to the public
hearing.
10.12.3. BZA Hearing
a. After review of the variance
application and the public hearing, the
BZA shall approve, approve with
conditions, or deny the application.
b. If approval or approval with
conditions is granted, the decision
shall be communicated in writing to
the applicant within 15 days, and the
applicant shall be authorized to
submit any necessary permit(s)
and/or application(s).
10.12.4. Criteria for Approval of Variances
Required Findings: A variance may be
granted by the BZA if it concludes that the
strict enforcement of any design and
performance standard set forth in this
Code would result in unnecessary
hardship to the applicant, and that by
granting the variance, the spirit of this Code will be observed, public welfare
and safety will not be diminished, and substantial justice will be done. A
variance may be granted in an individual case of unnecessary hardship only
when the BZA makes, and explains in writing, all of the following findings:
a. There are extraordinary and exceptional conditions pertaining to the
particular piece of property.
b. These conditions do not generally apply to other property in the vicinity.
c. The conditions are not the result of the applicant’s own actions.
d. Granting of the variance would not substantially conflict with the
Comprehensive Plan, other adopted regional plans, and the purposes and
intent of this Ordinance.
Application Submittal and
Completeness Review
Schedule Public Hearing and
Public Notification
Staff Report to BZA
BZA Hearing and Decision.
Resubmission for more
information (if necessary)
Appeal to Circuit Court
(if necessary)
Deleted: a development permit application
Deleted: For example, the variance is justified
because of topographic or other special conditions
unique to the property and development involved,
in contradistinction to the mere inconvenience or
financial disadvantage.
8/17/23 MRB Draft version 5 – RG. KS Notes.
e. Because of these conditions, the application of this Code to the particular
piece of property would effectively prohibit or unreasonably restrict the
utilization of the property.
f. The authorization of a variance will not be of substantial detriment to
adjacent property or the public good, and the character of the zone will not
be harmed by the granting of the variance.
10.12.5. Limitations: The BZA may not grant a variance if it would do any of the
following:
a. Allow the establishment of a use not otherwise permitted in the applicable
district.
b. Increase the density of a use above which is permitted in the applicable
district.
c. Physically extend a nonconforming use of land.
d. Change the zone boundaries shown on the Official Zoning Map.
10.12.6. Profitability Not to Be Considered: Profitability shall not be considered grounds
for a variance. Nor shall inconvenience or financial disadvantage.
10.12.7. Conditions: In granting a variance, the BZA may attach to it conditions
regarding the location, character, or other features of the proposed building,
structure, or use as the BZA considers advisable to protect established property
values in the surrounding area, or to promote public health, safety, or general
welfare.
10.12.8. Appeal: Any party aggrieved by the decisions of the BZA may appeal to the
circuit court within 30 days of the decision.
10.13. Administrative Appeals
10.13.1. Applicability
Any person aggrieved by a decision, interpretation, or determination of the
Administrator may appeal to the BZA. Upon receipt of any Administrative
Appeal application, The Administrator shall immediately transmit to the BZA all
papers constituting the record of the appealed action.
10.13.2. Process and Approval
a. Process Type: Public Hearing by the Board of Zoning Appeals (BZA).
b. Required Application Information: Within 30 days of a decision or order of
the Administrator, an application for appeal shall be filed with the
Administrator and the BZA specifying the grounds of the appeal.
8/17/23 MRB Draft version 5 – RG. KS Notes.
c. Public Notification: Public notice of all hearings shall be published in a
newspaper of general circulation within the Town within fifteen (15) days
prior to the public hearing.
d. Effect of Appeal: An appeal stays all legal proceedings in furtherance of the
action in question (except enforcement proceedings), unless the
Administrator certifies to the BZA that a stay would, in his/her opinion,
cause imminent peril to life and property. In such case, proceedings shall
not be stayed except by a restraining order that the BZA or by a court of
record may grant.
10.13.3. BZA Hearing: The BZA shall schedule the matter for a hearing at its next
regularly-scheduled meeting. At the hearing, any party may appear in person,
by agent, or by attorney. Following the
hearing, the BZA shall take one of the
following actions, consistent with the
provisions of this Ordinance:
a. Affirm the action of the Administrator;
b. Modify the action of the Administrator,
and to that end, the BZA shall have all
the powers of the officer, board, or
commission from which the appeal is
taken, and may issue a permit or direct
that a permit be issued; or
c. Reverse the action of the Administrator,
and to that end, the BZA shall have all
the powers of the officer, board or
commission from which the appeal is
taken, and may issue a permit or direct
that a permit be issued.
10.13.4. Findings of Fact: The BZA, in its execution of
the duties specified in this section, may subpoena witnesses, and in case of
contempt, may certify such fact to the circuit court that has jurisdiction.
10.13.5. Decision: All final decisions and orders of the ZBOA shall be in writing and shall
be permanently filed in the office of the board as a public record. All findings of
fact and conclusions of law shall be separately stated in final decisions or
orders of the BZA, which shall be delivered to parties of interest within 15 days
by certified mail.
10.13.6. Contempt Penalty: In case of contempt by a party, witness, or other person
before the BZA, the BZA may certify this fact to the circuit court of the county
Application Submittal
Schedule Public Hearing
and Public Notification
Staff Report to BZA
BZA Hearing and
Decision
Appeal to Circuit Court
(if necessary)
8/17/23 MRB Draft version 5 – RG. KS Notes.
in which the contempt occurs, and the judge of the court, in open court or in
chambers, after hearing, may impose a penalty as authorized by law.
10.13.7. Appeals: Any party aggrieved by the decisions of the BZA may appeal to the
circuit court within 30 days of the decision.
10.14. Amendments and Rezonings
10.14.1. Applicability
a. When the public necessity, convenience, general welfare, or good zoning
practice justify such action, and after the required review and report by the
Planning Commission (PC), the Town Council may undertake the necessary
steps to amend this Ordinance, and its accompanying map.
10.14.2. Initiation of Amendments
A proposed amendment to this Ordinance may be initiated by any member of
the Town Council, the PC, the Administrator, or by any person owning property
within the Town limits, by filing an application with the Administrator.
10.14.3. Approval Process
Requests to amend this Code shall be processed in accordance with the
following requirements:
a. Application Procedure: Application forms for code amendment requests
shall be obtained from the Administrator. Completed forms, together with
an application fee, plus any additional information the applicant deems
pertinent, shall be filed with the Administrator. Applications for zoning map
amendments (rezoning) shall also include:
1. Boundary map of the subject property that is prepared and sealed by a
registered land surveyor.
2. Where applicable, a copy of correspondence illustrating that the
applicant has solicited written comments from the appropriate property
owners’ association regarding the requested amendment. Such
correspondence shall encourage the association to direct any comments
in writing to the Administrator and the applicant within 15 calendar
days of receipt of the notification.
3. Written consent from the owner of the property that is being
considered for an amendment. This is required if the applicant is not the
Town of Chapin.
b. Staff Review and Report
1. The Administrator shall prepare a staff report that reviews the proposed
amendment in light of the Comprehensive Plan and the general
requirements of this Code. A copy shall be provided to the PC and the
applicant before the scheduled public meeting.
8/17/23 MRB Draft version 5 – RG. KS Notes.
2. For amendments where the most intense permitted use in the proposed district
would generate more than 50 external trips during the peak hour, a TIS (Section
5.6) may be required; all road improvements needed to maintain the current
level of service shall be identified (based on that analysis), and assurances shall
be provided so that all road improvements will be in place so the impacts of the
development are accommodated, and the current level of service is maintained.
c. Planning Commission Recommendation
1. Public Notification: Public notice of all hearings shall be published in a
newspaper of general circulation within the Town within fifteen (15) days prior
to the public hearing. In the case of an amendment to the zoning map, the
property shall be posted within fifteen (15)
days prior to the public hearing.
2. Hearing by PC: All papers and other data
submitted by the applicant on behalf of the
amendment request shall be transmitted to
the PC. The PC, at regular meetings, shall
review and prepare a recommendation for
transmittal to the Town Council. At such
meeting(s), any party may appear in person,
by agent, or by attorney. Following action by
the PC, all papers and data pertinent to the
application shall be transmitted to the Town
Council for final action. The PC shall study the
proposed amendment, taking into account all
factors that it may deem relevant, including,
but not limited to:
a. Consistency (or lack thereof) with the
Comprehensive Plan and other adopted
plans of the Town or Lexington County;
b. Compatibility with the present zoning,
with conforming uses of nearby property,
and with the character of the
neighborhood;
c. Suitability of the property that would be
affected by the amendment;
d. Compatibility with the natural features of — and any archaeological or
cultural resources on — the property;
e. Marketability of the property that would be affected by the amendment;
and
3. Availability of roads, sewer, water, and stormwater facilities generally suitable
and adequate for the affected property. At the close of the public meeting, the
PC shall recommend approval, modified approval, or denial of the amendment.
4. Upon receipt of a recommendation from the PC, the staff shall have 30
days within which to submit its report of the PC’s deliberations and
Pre-Application Meeting
Application Submittal and
Completeness Review
Schedule Public Hearing
and Public Notification
Staff Report to MPC
MPC Hearing and
Recommendation to
Council
Staff Report to Council
Town Council Action
8/17/23 MRB Draft version 5 – RG. KS Notes.
recommendation Town Council. If the PC or its staff fail to submit a
report within the 30-day period, it shall be deemed to have
recommended approval of the proposed amendment.
5. If, after three PC meetings, no recommendation has been made (e.g.,
each meeting has resulted in the request being tabled), the item will
proceed to Town Council. Staff will prepare a report of the PC
deliberations within 30 days of the third PC meeting.
d. Town Council Hearing
1. Public Notification: Public notice of all hearings shall be published in a
newspaper of general circulation within the Town within fifteen (15)
days prior to the public hearing. In the case of an amendment to the
zoning map, the property shall be posted within fifteen (15) days prior
to the public hearing.
2. Timing: Town Council shall consider the proposed map or text
amendment at the earliest reasonable date and shall consider the
report of the PC in making a decision.
3. Decision: Town Council shall act to approve, approve with
modifications, or deny the proposed amendment.
4. Notification of Result: The applicant shall be notified in writing within 15
days of Town Council’s action.
10.14.4. Update of Zoning Map
Following Town Council’s final action, any necessary changes shall be made to
this Ordinance, or to the Official Zoning Map within seven (7) days. A written
record of the type and date of such change shall be maintained by the
Administrator. After seven (7) days of the official action, the action by City
Council shall be considered official even if the Administrator fails to make the
written change to the appropriate document.
10.14.5. Appeals
An applicant aggrieved by the amendment decisions of the Town Council may
appeal to the circuit court within 30 days of the decision.
10.15. Vested Rights and Expiration of Approvals
10.15.1. General: A vested right pursuant to this ordinance or the Vested Rights Act is
not a personal right, but attaches to and runs with the applicable real property.
All applicable ordinances, municipal code sections, and regulations relating to
zoning, planning and land development within the municipality are subject to
this section.
10.15.2. Definition: “Site specific development plan”, in addition and as a supplement to
the definition set forth in Section 6-29-1520 of the South Carolina Code of
Laws, as enacted by Act 287 of 2004, is further defined to mean those
documents that comprise a complete application for a zoning permit,
8/17/23 MRB Draft version 5 – RG. KS Notes.
certificate of zoning compliance, variance, special exception, planned unit
development, sketch plat or sketch plan, or other similar approval that
authorizes the landowner to proceed with investment in grading, installation of
utilities, streets, and other infrastructure, and to undertake other significant
expenditures necessary to prepare for application for a building permit.
10.15.3. Establishment and Conditions of Vested Rights: A vested right is established for
2 years upon the final approval of a site-specific development plan (e.g., site
plan or subdivision plan) or phased development plan (e.g., PUD) that
authorizes the developer or landowner to proceed with investment in grading,
installation of utilities, streets, and other infrastructure, and to undertake
other significant expenditures necessary to prepare for application for a
building permit. An applicant shall have 2 years from final approval to receive a
final plat, building permit, or, if no building permit is required, to obtain a
Zoning Permit, or other similar plan approval. The following are additional
conditions for vested rights.
a. A vested right in a development plan, plat, or phased development plan
shall not attach to the property until all plans have been received, approved
and all fees paid in accordance with this ordinance.
b. A vested right is subject to revocation by the Town Council, after notice and
public hearing, that there was a material misrepresentation by the
landowner or substantial noncompliance with the terms and conditions of
the original or amended approval.
c. A vested plan is subject to later local development regulations that impose
additional site plan related requirements, but does not affect allowable
types, height as it affects density or intensity of uses, or density or intensity
of uses.
d. A vested right may receive up to 5 one-year extensions for good cause upon
written request by the landowner to the Zoning Administrator and no later
than one month prior to expiration.
e. Phased development plans remain subject to review and approval of all
phases prior to any portion of the project being vested.
f. In case of projects where more than one building is to be built, the applicant
may submit a series of Building Permit applications, if deemed acceptable
by the Building Official of Lexington County. The first application must be
submitted within two years from the date the development plan approval is
granted. Each subsequent application must be submitted within 180 days
from the date of issuance of a Certificate of Occupancy for the previous
building, whichever shall occur first. The lapse of more than 180 days may
cause the expiration of the Development Plan approval unless an extension
is approved, upon a showing of good cause for the delay.
g. A vested site-specific development plan or vested phased development plan
is subject to later enacted federal, state, or local laws adopted to protect
public health, safety, and welfare including, but not limited to, building, fire,
plumbing, electrical, and mechanical codes and nonconforming structure
8/17/23 MRB Draft version 5 – RG. KS Notes.
and use regulations which do not provide for the grandfathering of the
vested right. The issuance of a building permit vests the specific
construction project authorized by the building permit to the building, fire,
plumbing, electrical, and mechanical codes in force at the time of the
issuance of the building permit.
h. The Board of Zoning Appeals does not have the authority to grant a vested
right and no such right shall accrue as a result of their decision
i. If real property having a vested site-specific development plan or vested
phased development plan is annexed by the Town of Chapin, the Town
Council must determine, after notice and public hearing in which the
landowner is allowed to present evidence, if the vested right is effective
after the annexation.
j. The Town may not require that a landowner waive his vested rights as a
condition of approval or conditional approval of a site-specific development
plan or a phased development plan.
8/18/23 MRB Draft_v4 – RG. KS Notes
Article 11 - Nonconformities
11. Nonconformities
11.1. Purpose and Intent
11.1.1. The Town of Chapin recognizes that there are parcels, structures, uses, and
other site features within its jurisdiction that do not conform to the
requirements of this Ordinance but were lawfully established prior to the
Ordinance’s adoption. This article shall regulate the continued existence of
these features that do not conform to the provisions of this Ordinance.
11.1.2. As this Ordinance establishes the necessary rules to attain the vision of the
adopted comprehensive plan, nonconformities are declared to be incompatible
with permitted development. It is the intent of this Article to allow
nonconformities to continue until they are removed but not to encourage their
survival except under the limited circumstances established in this Article.
11.2. Authority to Continue
Nonconformities are allowed to continue subject to the requirements of this Article.
11.3. Determination of Nonconformity Status
The burden shall be on the landowner or developer to establish an entitlement to
continue a nonconformity or to complete a nonconforming project. The Administrator
may issue a Zoning Permit upon acceptance of reasonable proof (i.e. business license,
utility bills, tax documents) that the nonconformity was lawfully in existence at the time
of the effective date of this ordinance.
11.4. Change of Tenancy or Ownership
Changes of tenancy, ownership, or management of an existing nonconformity are
permitted within, and in such cases the nonconformity shall continue to be subject to
the Permitted Use Table and requirements of this Article.
11.5. Minor Repairs and Maintenance
Minor repairs and normal maintenance that are required to keep nonconforming uses,
structures, signs, and other site features in a safe condition are permitted, provided the
minor repair or maintenance does not extend, expand, or enlarge the nonconforming
use, structure, or sign.
11.6. Historic Buildings
Buildings on the National Register of Historic Places shall be considered conforming to
this Ordinance as hereinafter provided. This conforming status shall only apply to
height, setback, yard, area, and other dimensional requirements. Such finding shall
supersede any conflicting standard set forth in the zoning district in which the building is
located and shall be applied to the building and the site in making future determinations
8/18/23 MRB Draft_v4 – RG. KS Notes
of conformity as to the existing building or any changes consistent with an approved
Certificate of Appropriateness. Notwithstanding anything to the contrary herein,
alteration or removal of architectural features and/or historic fabric considered
instrumental in the original National Register designation by the Architectural Review
Board may, at the option of the Board, result in the loss of historic designation and
conforming status.
11.7. Legal Nonconforming Uses
Legal nonconforming uses are uses that were lawfully established and maintained, but
do not comply with the current use regulations applicable to new uses in the zoning
district in which it is located. This section sets forth the requirements for the extension
and/or enlargement, the conditions whereby a change in an existing nonconforming use
may be permitted, and the loss of legal nonconforming use status.
11.7.1. Change of Use
A legal nonconforming use shall not be changed to any other nonconforming use
unless the requirements in Article 4 lists are met.
11.7.2. Abandonment
11.7.2.1. A nonconforming use shall be considered abandoned when:
11.7.2.1.1. The nonconforming use has been discontinued upon lapse
of business license, disconnection from utilities, cessation of
waste services… for a period of twelve (12) consecutive
months or more.
11.7.2.1.2. The Nonconforming Use has been replaced by a conforming
use.
11.7.2.2. Once a Nonconforming Use is abandoned, the use’s legal
nonconforming status shall be terminated and any subsequent use of
the property shall comply with the regulations of the zoning district in
which it is located.
11.7.2.3. Exceptions: Nonconforming residential uses are exempted from the
abandonment provisions.
11.7.3. Expansion and Enlargement
11.7.3.1. A Nonconforming Use shall not be expanded.
11.7.3.2. A Nonconforming Use may not be extended to any portion of a
completed building that was not occupied by that use when it became
nonconforming.
11.7.3.3. A Nonconforming Use may not be extended to additional buildings,
land outside the original building, additional patron space, or
additional outdoor space.
11.7.3.4. A Nonconforming Use of land or outdoor space may not be extended
to cover more land or outdoor space than was occupied by that use
when it became nonconforming.
8/18/23 MRB Draft_v4 – RG. KS Notes
11.7.3.5. The extent, degree, intensity, or frequency of a Nonconforming Use
may not be increased.
11.7.3.6. Where a nonconforming use exists, new equipment and processes
may be utilized in order to modernize the operation but not to change
the use.
11.7.4. Damage or Destruction of a Nonconforming Use
11.7.4.1. When a building or structure containing a Nonconforming Use is
damaged by intent or by neglect, not caused by natural disaster or
uncontrollable act, the use shall not be reestablished except in
conformity with the regulations this Zoning Ordinance.
11.7.4.2. When a building or structure containing a Nonconforming Use is
damaged by natural disaster or uncontrollable act the use may be
restored in as close to conformity with the regulations of this Zoning
Ordinance as possible. A Zoning Permit and a Building Permit shall be
obtained within twelve (12) months of the date of occurrence of such
damage, and once issued, construction shall be diligently pursued and
completed within two (2) years from the date of the occurrence of
such damage.
11.8. Nonconforming Lots of Record
A Nonconforming Lot is a duly recorded lot of record established prior to adoption of
this Ordinance that does not comply with the minimum Lot Area, lot width, or other
requirements of this Ordinance.
11.8.1. Changes to Nonconforming Lots
No action shall be taken that increases the degree of nonconformance of a
Nonconforming Lot.
11.8.2. Use of Nonconforming Lots
11.8.2.1. A nonconforming Lot may be developed to the extent that the
development can be accomplished in accordance with the standards
set out in this Zoning Ordinance.
11.8.2.2. This Article shall not protect nonconforming lots that do not have
access to a street, or are without street frontage. Owners of such lots
shall replat such lots in conformity with the applicable regulations of
this Ordinance.
11.9. Nonconforming Structures
A Nonconforming Structure is any building or structure that was legally established but
no longer complies with the density, lot coverage, floor area, height, architectural, and/or
other dimensional standards of this Ordinance.
11.9.1. Modification to Nonconforming Structures
8/18/23 MRB Draft_v4 – RG. KS Notes
A nonconforming structure shall not be expanded in any way, except in
conformity with this Ordinance, except in cases where the primary building on a
lot is nonconforming solely as a result of a setback encroachment, additions to
the structure can be allowed, provided the new addition does not project into
the setback. If a proposed addition would encroach into the same setback that
already had been encroached upon, the addition can be allowed, provided it
projects no further into the setback than the existing structure. In cases where
the renovations, repairs, additions, or other improvements evidenced by a
building permit, exceed 150% of the appraised value the applicant shall
compliance with architectural requirements (Article 6) and site features as
described in Section 11.11.
Permitted: Extension of existing
nonconforming setback with no further
encroachment
Not Permitted: Extension of existing
nonconforming setback with further
encroachment
*Source, City of Beaufort – Beaufort Code
11.9.2. Use of a Nonconforming Structure
This Section shall not be construed as prohibiting the conversion of a
nonconforming structure which does not meet the minimum dimensional or
architectural requirements of this ordinance to another permitted use, so long
as the degree of nonconformity is not increased.
11.9.3. Reestablishment after Demolition, Damage, or Destruction
11.9.3.1. If a nonconforming structure is destroyed by fire, explosion, act of God,
or the public enemy, the structure may be replaced with a structure
identical in size, shape (building footprint), and height, provided it
meets all applicable building code requirements. Repairs may be made
to any nonconforming structure so long as the extent of any original
nonconformity is not increased. In cases where the repairs exceed
150% of the appraised value, the applicant shall compliance with
architectural requirements (Article 6) and site features as described in
8/18/23 MRB Draft_v4 – RG. KS Notes
Section 11.11 to the furthest extent practical as determined by the
Administrator.
11.9.3.2. A nonconforming structure shall not be intentionally demolished and
rebuilt as a nonconforming structure.
11.9.3.3. Time period: shall be obtained within twelve (12) months of the date of
occurrence of such damage, and once issued, construction shall be
diligently pursued and completed within two (2) years from the date of
the occurrence of such damage.
11.10. Nonconforming Signs
A Nonconforming Sign is any sign that was legally established but no longer complies
with the size, setback, or other dimensional standards of this Ordinance. The
Administrator shall keep and maintain a record of all nonconforming signs in the Town
at the time of adoption of this ordinance, however a nonconforming sign excluded from
this record shall not exempt the sign from conformance with this ordinance.
11.10.1. General
11.10.1.1. A nonconforming sign may continue in operation and maintenance,
provided a nonconforming sign shall not be:
11.10.1.1.1. Changed to or replaced with another nonconforming sign
(this provision shall not prohibit a change in copy or
graphics on the sign face of the sign);
11.10.1.1.2. Modified in a way that increases the degree of
nonconformity;
11.10.1.1.3. Relocated, except in compliance with this Article; or
11.10.1.1.4. Reestablished after damage or destruction of more than 50
percent of the replacement value of the same type of sign
at the time of such damage or destruction above which the
sign shall not be restored except in conformity with the
regulations this Ordinance.
11.10.1.2. With the exceptions noted above, this section shall not prevent
repairing or restoring to a safe condition any part of a nonconforming
sign or sign structure, or normal maintenance operations performed
on a nonconforming sign or sign structure.
11.11. Nonconforming Site Features
Nonconforming site features are elements of site development such as off-street
parking, landscaping, lighting, open space, buffers, or connectivity of compatible uses
11.11.1. General
11.11.1.1. Alterations of Buildings or Structures: For purposes of this article,
the term “alteration of a building or structure” means any alteration,
as defined in the Building Code, of a structure lawfully erected.
Deleted: on the lists
Deleted: list
8/18/23 MRB Draft_v4 – RG. KS Notes
11.11.1.2. If an application for a building permit is submitted for the alteration
or renovations of a building or structure on a site that has one or
more nonconforming site features, and if the cost of the proposed
alteration exceeds 100 percent of the current Fair Market Value or
an expansion of 20% of the gross floor area of the building or
structure, the applicant shall allot 5% to bring the nonconforming
site features into compliance as much as feasible, as determined by
the Administrator. The Administrator will determine the priority of
the investment of the 5% based on the severity of each
nonconforming feature (off-street parking, landscaping, lighting,
pedestrian amenities, and connectivity).