CHAPIN UNIFIED ZONING & DEVELOPMENT ORDINANCE
STEERING COMMITTEE SPECIAL CALLED MEETING
Council Chambers, Chapin Town Hall
August 16, 2023
3:00 P.M.
AGENDA
Call to order
Freedom of Information Act Compliance
New Business
1. Draft Review
a. Article 5: Land Development Standards
b. Article 3: Zoning Districts and Draft
Zoning Map
Adjourn
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
1
Article 5 Land Development Standards
5. Land Development Standards
5.1. Purpose
The public health, safety, economy, good order, appearance, convenience, morals, and
general welfare require the harmonious, orderly and progressive development of land
within the Town of Chapin. In furtherance of this general intent, the regulation of land
development by the Town of Chapin is adopted for the following purposes, among
others:
• To encourage the development of an economically sound and stable
community;
• To assure the timely provision of required streets, utilities, other facilities and
services to new land developments;
• To assure the adequate provision of safe and convenient traffic access and
circulation, both vehicular and pedestrian, in and through new land
developments;
• To assure the provision of needed public open spaces and building sites in new
land developments through the dedication or reservation of land for
recreational, educational, transportation and other public purposes; and
• To assure, in general, the wise and timely development of new areas or
redevelopment of areas in harmony with the adopted Town of Chapin
Comprehensive Plan.
5.2. Applicability
5.2.1. The following development shall comply with the improvement requirements in
this article:
a. The developer, owner, or applicant shall be responsible for the
improvements required with all new, significantly improved, or expansion of
development that require Minor or Major Subdivision Review.
b. New development and significantly improved as required for Major
Architectural Review (Section 10.6)
5.2.2. The applicant shall be responsible for the installation and construction of
required improvements according to the provisions of this ordinance, except as
may otherwise be specifically provided herein or by Town policy or agreement.
5.2.3. Approval of a final plat shall be subject to the applicant having installed the
improvements designated in this article, or having Improvements Guarentee to
the satisfaction of the Town and Lexington County for installation of said
improvement(s).
5.2.4. General Requirements
a. Street Improvements: Land designated for public or private streets shall be
cleared and filled in accordance with the latest edition of the “South
Carolina Standard Specifications for Highway Construction”, South Carolina
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
2
State Highway Department, or as determined appropriate by the Lexington
County Engineer or Administrator.
b. Water and Sewer Facilities: Water and sewer facilities shall be provided in
accordance with the standard procedures and policies of the Town , the
Department of Health and Environmental Control (DHEC) and by the water
and sewer provider, if different from above.
c. Utility Lines: All utility lines within a development site shall be installed
underground, unless there are existing above-ground lines that serve the
property. When it is found to be necessary and desirable to locate public
utility lines in a location other than street right-of-way, easements shall be
shown on the plat for such purposes. When the water main is located in the
street right-of-way and it will be necessary to cut into the street surface to
serve abutting lots, a connection shall be stubbed out to the property line to
serve each lot before the street is surfaced. Such easements shall be not
less than twenty (20) feet along rear property lines and fifteen (15) feet
alongside property line, subject to the approval of the jurisdiction having
authority, and, where possible, shall be centered on rear and side lot lines.
d. Natural Gas: When gas lines are located in a street right-of-way, where
possible, such lines shall be located outside the portion of the street to be
surfaced to prevent cutting into the paved surface to serve abutting
properties.
e. Improvement of Existing Substandard Conditions: Where the existing right
of way is substandard, the developer shall be required to dedicate the
appropriate amount of right-of-way (as measured from the centerline of the
existing street) as well as install all noted sidewalk zone improvements
including expanded sidewalks and street trees, lighting, storm drain
improvements and street furniture as a part of the development process.
Requests for waivers based on practical hardships shall be made to the
Planning Commission. Appeals to this decision shall follow the process
outlined in Section 10.7.1.d
f. Flood Hazard Areas: In accordance with the Town’s Flood Prevention
Ordinance, any development that contains land subject to flooding shall be
accompanied by evidence that no appreciable expansion of the area subject
to flooding would result from the proposed development of the land being
subdivided, and that the proposed development will be adequately
protected from inundation without appreciable interference with the flow
of any watercourse or into an impounding basin. In no case shall any fill,
levee, or other protective works be approved unless sufficient
compensating adjustments of waterways, ditches, or impounding basins are
made to prevent any appreciable expansion of flood hazard area.
g. Storm Drainage: An adequate drainage system, including necessary
improved open channels, pipes, culverts, storm sewers, intersection drains,
drop inlet, bridges, and other necessary appurtenances shall be installed by
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
3
the subdivider and shall be according to plans and specifications approved
by the Lexington County Stormwater Management Division.
5.2.5. Surveying and Engineering
a. Installation of Permanent Reference Points: Permanent reference points
shall be placed in accordance with the following requirements:
1. General Standards: Boundary surveys shall be performed, in accordance
with the state minimum standards published by the State Board of
Registration for Professional Engineers and Land Surveyors, unless more
stringent requirements are specified. A minimum of two points in any
survey must be tied to the state plane coordinate system. The survey
may be done on the horizontal ground distance and tied back to the
state plane coordinates.
2. Control Monuments: Vertical control monuments shall be placed in or
near the centerline of pavement of subdivision streets at a minimum of
1 per 4 acres. Where practical, control monuments shall be placed at
points of curvature and points of tangency of curves. The control
monument may be poured on the job or be a concrete marker of the
type commonly used in the area: at least 3 feet long and tapered with a
12-inch long, 1/4-inch diameter brass or bronze rod embedded in the
top. Control monuments shall be placed in a cast iron water main valve
type box with a cover flush with the pavement.
3. Property Marker: A steel or wrought iron pipe, rebar, or the equivalent,
not less than 0.5 inches in diameter and at least 24 inches in length shall
be set at all property corners and points of curves, except those located
by monuments. They shall be flush with the ground.
4. Accuracy: Land surveys within the Town limits shall be Class A surveys,
set at an accuracy of at least 1:10000.
5.2.6. Improvement Guarantees
a. Types Allowed: Prior to approval of a Final Subdivision Plat the applicant
shall provide a performance guarantee to ensure the completion of required
improvements within a period of time as agreed upon by the Administrator
or Lexington County Engineer and the applicant, and expressed in the
guarantee. Such guarantee may be in the form of a performance bond, a
surety bond, a cash deposit, or a letter of credit. A performance guarantee
shall be posted in the amount of 125% of the total cost of improvements, or
in an amount otherwise approved by the Administrator or Lexington County
Engineer.
1. Performance / Surety Bonds and Letters of Credit: The performance or
surety bond, or letter of credit, shall be in a form acceptable to the
Town. It shall include a pledge by the bank, insurance company or other
bonding/lending institution that the funds necessary to carry out the
terms of the agreement are guaranteed for payment, and will be
released only upon receipt of written instruction from the Town.
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
4
2. Cash Deposits: If surety is in the form of a cash deposit with the Town of
Chapin, proportional parts thereof shall be refundable in relation to
progress payments less retainage, subject to approval of the Town and
subject to a minimum deposit balance of 25% of the project cost.
3. Maintenance Guarantees for Private Streets: If the applicant completes
all required improvements and complies with all conditions of the
subdivision agreement as determined by the Town and Lexington
County, the remainder of monies retained by a financial institution or by
the Town may be released to the applicant or his successor in title. Prior
to release, the applicant shall provide the Town and Lexington County,
prior to the issuance of any building permit, a performance bond, a
surety bond, or a cash deposit equal to the amount determined by
Town and Lexington County that would ensure the repair of any damage
to the existing improvements during the course of any construction, but
in no case will the amount of the security be less than $1,000 for each
individual building lot. Prior to the issuance of any certificate of
occupancy, Lexington County and the Town shall determine whether or
not any breakage or damage has occurred. If no damage to any off-site
improvements has occurred, then Lexington County may release the
security to the applicant or his successor in title. If damages have
occurred, they shall be repaired, or the Town or County may draw on
the security before it is released.
5.2.7. Street Layout Standards
a. General Standards: All streets, which shall hereafter be established in
connection with the development of a subdivision, shall comply with the
following design standards:
1. The layout of the streets as to arrangement, character, width, grade,
and location may be required to conform to the Town’s Master Plan,
Official Maps, Comprehensive Plan, and other adopted plans involving
transportation infrastructure.
2. Connectivity between compatible uses and adjoining street systems to
reduce curb cuts on major thoroughfares and encourage local traffic to
use alternative routes on local streets. Compatible uses are uses of
similar intensity and characteristics permitted in similar zoning districts,
as determined by the Administrator.
3. Where a subdivision abuts or contains an existing or proposed collector
or through street, the Planning Commission may require marginal
access streets, reverse frontage with screen planting, deep lots, or such
other treatment as may be necessary for adequate protection of
residential properties and to afford separation of through and local
traffic.
4. Roads of an existing subdivision shall not be used as the sole means of
ingress and egress in developing any new subdivision, minor or major,
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
5
or extending an existing one unless granted by the Planning
Commission. If, in the judgement of the Planning Commission, the
increased traffic and noise would create a safety hazard or otherwise be
detrimental to residents of the existing subdivision, additional access
shall be provided.
b. Continuation of Existing Street Pattern
Wherever topography will permit, the arrangements of streets in a
subdivision shall provide for the alignment and continuation or projection of
existing streets in adjoining areas. This is to mean the interconnectivity of
subdivision developments.
c. Block Sizes
The Planning Commission shall examine every proposed subdivision as to its
compliance with the following provisions:
1. Nonresidential Blocks: Non-residential blocks shall be of such length and
width as may be suitable for their prospective use, including adequate
provision for off-street parking and service.
2. Residential Blocks: the length of residential blocks hereafter shall not
exceed fourteen hundred (1400) feet or be less than six hundred (600)
feet from corner to corner. Provided, however, such length
requirements may be modified when appropriate due to the
topography or physical shape of the property being subdivided. The
width of any residential block shall be sufficient to permit two (2) tiers
of lots, where topography and land ownership permits, except as
otherwise provided in these regulations.
3. Crosswalks: When any type of block exceeds seven hundred (700) feet,
or when the Planning Commission determines it needed when less that
X feet, crosswalks for pedestrians shall be required. Such right-of-way
shall not be less than ten (10) feet wide and improved to include a
concrete, asphalt or other approved surface sidewalk six (6) feet wide
and four (4) inches thick.
d. Connectivity to Adjacent Properties
New developments shall, connect to any existing street stubs from adjacent
properties and stub to all adjacent properties. Street stubs shall continue
the existing street pattern if applicable.
1. Exemptions: Street stubs shall not be required where the conditions
listed below would prevent connections:
a. Topographical conditions (pre-development slopes of 18% or
greater)
b. Environmental conditions (marshes, floodplains, etc.)
c. Property shape
d. Property accessibility (existing platted subdivision with no stubs)
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
6
e. Incompatible adjacent land uses
2. Location: Where multiple connection opportunities exist, street stub
connections shall be prioritized in the site design as follows:
a. Adjacent parcels 20 acres or greater in size.
b. Adjacent parcels that abut or are traversed by existing or proposed
streets.
c. To minimize overall access points along an arterial or collector
street.
*Source: Summerville, SC Unified Development Code.
3. Design: Stub streets and streets intended for extension during future
phases shall be constructed to extend to the property line or as close to
the line as practical. It shall be the responsibility of the second
development to construct the connection to an existing stub street.
Stub streets shall not exceed 150 feet in length without a paved
turnaround (permanent or temporary)
4. Adjacent Parking Areas: Where most feasible, parking areas that are
adjacent to each other shall be connected to limit curb cuts and access
points along the public right-of-way. This connection shall have a
maximum width of 24’, with two 12’ wide travel lanes.
e. Cul-de-sacs and Dead-End Streets
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
7
Dead end Streets are strongly discouraged and Cul-de-sacs are not
encouraged to be a dominant feature within a development site as they can
restrict opportunities for interconnectivity for local vehicular and pedestrian
traffic. Dead end street and Cul-de-sacs shall be considered and approved
\by the Planning Commission during the preliminary plat stage. If a dead-
end street or cul-de-sac is proposed, it shall be subject to the following:
1. Permanent dead-end streets shall be no longer than 500 feet and shall
be provided with a turnaround such as a cul-de-sac.
2. Temporary dead-end streets shall be provided with a temporary
turnaround area which shall be designed considering traffic usage,
maintenance, and removal.
3. Half streets are prohibited along property lines, entire street right-of-
way shall be platted within the proposed subdivision.
4. The Planning Commission may require the reservation of an access
easement at the terminus of a cul-de-sac so that connections to existing
or future pedestrian trails or street stubs may be established, if not
possible elsewhere on the site.
5.2.8. Street Design Standards
a. General
When a subdivision creates new streets, they shall be subject to the street
design standards of this section. The Planning Commission, in coordination
with Lexington County and SCDOT when applicable, shall approve the street
design, location, and classification during the review of the preliminary plat
in the Subdivision process (Article 10.X). The following are general
standards for the design of roadways:
1. SCDOT Standards: Intersection sight distance on major thoroughfares
shall be determined by the State Highway Department. Grades on major
thoroughfares shall be established by the State Highway Department.
On major thoroughfares, the centerline radius of a curvature shall be
determined by the State Highway Department. In the event of any
conflicts or contradictions, administrator shall use the ARMS Manual by
SCDOT, or defer to Lexington County Engineer, or authorized
representative from SCDOT, as appropriate.
2. Traffic Control devices: Signs and/or signals, shall be installed by the
Developer as deemed appropriate by the Lexington County?, its
agencies and/or the South Carolina Department of Highways and Public
Transportation. The authority to require traffic control devices may be
exercised by the Town at any time during the approval process.
3. Street Jogs: Street jogs shall be avoided, unless approved or
recommended by SCDOT or Lexington County.
4. Naming of Streets: Streets that are extensions of, or obviously in
alignment with existing named streets, shall bear that name. The name
of new streets shall be subject to the approval of the Planning
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
8
Commission and shall not duplicate or be similar in sound to existing
names in Lexington County, irrespective of the use of the suffix street,
avenue, circle, way, boulevard, drive, place, or court or the like.
Developers shall follow the Lexington County Addressing and Road
Naming Ordinances. Street name signs shall be installed at all
intersections within a subdivision. The location and design of such signs
shall be approved by the Planning Commission and Lexington County.
5. Split Level Streets: Streets which are constructed so as to have two
traffic ways, each at different levels within the same right-of-way, shall
provide a paved traffic surface of at least twenty (20) feet on each level
and a slope between the two traffic ways of three to one (3:1) or flatter
6. Intersections: The centerline of no more than two (2) streets shall
intersect at any one point. Streets shall be laid out so as to intersect as
nearly as possible at right angles and no street shall intersect any other
street at an angle of less than sixty (60) degrees (angles of intersection
to be measured at the intersection of street centerline). Curved streets
shall have a minimum tangent of one hundred (100) feet at
intersections.
7. Nonconforming Right-of-ways: Proposed Subdivisions which include an
existing platted street that does not conform to the minimum right of
way requirements of these regulations shall provide additional width
along one or both sides of such street so that the minimum right of way
required by these regulations is established. Subdivisions abutting only
one side of such street shall provide a minimum of one half, measured
from the centerline of the existing right of way, of the right of way
required by these regulations.
b. Street Sections
During review of the sketch plan/preliminary Plat, the applicant shall
identify all proposed streets and existing street classifications on the site
plan. The applicant will be required to install all improvements within the
development site. All private and public streets are subject to the
requirements within this section and the requirements for Lexington
County.
Street
Classifications
Right-Of-Way
(Min/Max)*
Travel
Lane
Width
(Min/Max)
On-street parking** Planting
Strip
(both
sides of
street)
Sidewalk
1. Residential or
Light
Commercial
Collector
50’/66’ 12/16.5’ N/A 4’ 4’
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
9
2. Residential
Local
50’/60’ 11/12’’ Determined by PC 4’ 4’
3. Private
Commercial
50’/60’ 11’/12’ Determined by PC 4’
4. Private
Residential
50’ 10.6 Determined by PC 4’
5. Downtown
Street
50’/60’ 24’ Required 4’ 10’
6. Private Rear
lane
(Residential)
20’ 10’ Determined by PC N/A N/A
7. Private Alley
(Commercial)
24’ 12’ N/A N/A N/A
*Right-of-way widths shall not be in conflict with SCDOT standards
**All parking spaces shall comply with parking space dimensions in Parking Section.
*Example Street Section, Source: City of Buffalo, NY - Unified Development Ordinance
1. Additional Standards for Streets: The intent of the Town’s street design
standards within the UDO is to not conflict with the street design
requirements of the Lexington County Public Works Department. In
addition to the above table, private, local, and collector streets as
described in the above tableshall comply with street grade, horizontal
curves, and intersection sight distance as required by SCDOT or
Lexington County.
a.
c. Sidewalks
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
10
1. General Standards: Sidewalks shall be installed and shall be constructed
on both sides of streets and to the specifications of Section 5.3.5.b.
Sidewalks shall be constructed within the street right-of-way or public
access easement, as reviewed and approved by the Town and Lexington
County. Sidewalks shall be a minimum of 4 feet wide unless otherwise
noted.
2. Timing of Sidewalk Construction: To ensure that all street improvements
are constructed prior to the completion of a project, Sidewalk as
required by Section 5.3.5.b, must be constructed before each house or
structure receives a final Certificate of Occupancy or, if the street is
already constructed, prior to acceptance or approval of all
improvements. This intent of this section is not to require the
construction of a sidewalk at a time where permitted activities damage
or otherwise impact the sidewalk. This does not apply to pedestrian
paths or trails that will be provided outside of the normal right-of-way.
3. Existing Sidewalks: Where existing sidewalk abuts an area where new
sidewalk is to be developed, the new sidewalk shall be the same width
as the existing sidewalk if the existing sidewalk exceeds the standards in
Section 5.3.5.b. In cases where it is appropriate, a new sidewalk may be
permitted to taper down to the minimum width in Section 5.3.5.b. over
a distance determined and approved by the Planning Commission.
4. Commercial and Multi-Family Developments: Within commercial areas
and places with high pedestrian volumes, sidewalks should be designed
to meet the anticipated pedestrian/traffic volume as well as
accommodate outdoor seating. Multi-family and commercial
developments shall provide sidewalks for interior movement of
pedestrians and for interior to connect to public sidewalk system, as
required by Article 8.
d. Street Tree Planting Requirements
1. Planting Areas: Planting strips in accordance with cross sections in
Section 5.3.5.b.
2. Location and Number: Street trees shall be planted at forty (40) foot
intervals within five (5) feet of the street right-of-way on both sides of
the street, but must be outside the right-of-way. Street trees shall be
installed within the planting strip between the sidewalk and the curb of
a street to ensure that the trees provide adequate shade and protection
from vehicular traffic. Street trees may also be located in other
locations, such as within public access easements, where practical and
as determined by the Town and Planning Commission during the review
of the Preliminary Plat
3. Applicable to TC and VC: Street trees may be installed within tree wells,
and shall be installed to replicate existing spacing patterns of street
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
11
trees. The Administrator shall determine the appropriate spacing of
street trees.
4. Tree Species: Diverse species of street trees from the Town’s Approved
Tree Species List shall be used. The street type, soil, and irrigation to be
used should inform the species used.
5. Minimum Tree Size: At the time of planting, small maturing trees
should be 2.5-inch caliper, with the lower side of the crown a minimum
of 6 feet above grade to avoid hazards to pedestrians.
6. Tree Wells: Tree size and longevity is directly related to soil volume and
quality; projects where tree wells are utilized will be evaluated on an
individual basis to determine the ideal size of the tree well for the
application and context in an attempt to maximize volume. Where
possible with new construction, a continuous trench of soil (even
underneath hardscape) should be provided for root growth.
7. Root Guards: To ensure the protection of the street trees root system,
as well as utility lines and paved surfaces, all street trees shall be
installed with root guards.
e. Street Lighting
1. General Standards: It is the intent of the town to have well-lit streets for
cars and most importantly for the safety and comfort of pedestrians.
Lighting shall be placed such that it is well coordinated with the
expected canopy of street trees. Standard 15,000 lumen H.P.S street
lights shall be installed, and appropriately shielded to prevent light
spillover to adjacent properties. The Town of Chapin will require street
lights to be installed at a minimum ratio of one light for every six units
or 200’ whichever is less in residential developments. In nonresidential
developments it one light per 175’ as measured by street length. The
maximum height for street lights is 25’. Lighting plans with fixture
designs and schematics shall be submitted and approved prior to
installation.
2. Maintenance and Ownership: The developer shall be responsible for the
operating cost of said lights at the standard rate subject to the rate and
class of service approved by the South Carolina Public Service
Commission.
f. Exceptions
1. The Town recognizes that the required street sections and streetscape
may not always be constructed as prescribed in this article. Reasonable
relief may be granted by the Planning Commission if the connection to
an existing right-of-way or construction of a new right-of-way
encounters any of the following constraints:
a. Insufficient existing street right-of-way
b. Topographic features
c. Conflict with SCDOT or County road project
d. Legal constraints
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
12
5.2.9. Street Access Standards
a. Applicability: Any development that requires an access point (rear alley/lane
or driveway) for purposes of ingress and/or egress shall be subject to the
provisions of this section. All new accesses must be approved by the
appropriate permitting authority. The Town encourages developments that
limit and/or combine access points to prevent high concentrations of access
points along main roads.
b. Maximum Number: For single-family, two- and three-family dwellings, only
one driveway shall be permitted per lot. In Rural Districts (RA, RR) and
Suburban Residential Districts (SR), circular driveways may be permitted on
lots greater than 100 feet in width. The maximum width for driveways in
residential areas is 16’. Commercial driveways may have two lanes, ingress
and egress, each 12’ in width, unless otherwise required by SCDOT. For
double frontage lots, one curb cut per street may be permitted. For all other
building types, the maximum number of driveways allowed for any property
is outlined in the table below:
Table 5.3.6.2
Frontage Width Maximum Permitted Driveways per Street Frontage
Up to 150 feet 1 driveway
150 feet or more 2 driveways
c. Locations and Spacing
1. Street Intersections: No curb or other access point shall be located
closer than 20 feet from the intersecting point of the 2 street right-of-
way property lines involved. No curb or other access point shall be
closer than 25 feet from the intersection of the 2 curb lines involved.
2. Spacing: All access points shall have a minimum separation from certain
features as follows:
Table 5.3.6.3.2 Access Point Locations and Spacing
Feature Minimum Separation
Adjacent Property Line (except shared driveways) 5ft*
Another curb cut on local street 25ft**
Less than 35 mph 200ft**
40 mph 250ft**
45 mph 300ft**
50 mph 400ft**
55+ mph 500ft**
*May be waived or reduced by the Planning Commission in certain cases during preliminary
plat review if not in conflict with a required buffer as described in Article 7.
**As measured from centerline of the driveway or street
5.3. Open Space
5.3.1. General Standards
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
13
The Planning Commission shall require that open and green space be reserved
for active or passive recreation where such reservations would be appropriate.
Each reservation shall be of suitable size, dimension, topography and general
access for the particular purposes envisioned by the Planning Commission.
These areas shall be shown on the Plat and marked “reserved for recreation
open space”.
To ensure the orderly development of the community, the subdivider shall be
required to reserve and negotiate to sell needed spaces for parks, schools, fire
stations and playgrounds, as required by local governmental units, for a period
not to exceed thirty (30) days from the date of submission of the Sketch Plan.
The reservation period may be extended for one (1) additional thirty (30) day
period if a governmental unit files with the Planning Commission a written
statement indicating a desire to negotiate.
5.3.2. Amount of Open Space Required
Development subject to these standards shall provide open space set-asides in
an amount that meets or exceeds the minimum area in Table 5.4.2.a: Required
Open Space, based on the use and the zoning district where the development is
proposed. If there is a conflict with the requirements herein, this article shall
govern.
a. Required Open Space
Table 5.4.2.a: Required Open Space
Minimum Open Space Area (% of Development Site Area)
Size of Development* Less than 10 acres 10-15 acres Greater than 15
acres
District
Agricultural (RA or RR) 50% 50% 50%
Suburban Residential (SR1,
SR2, & SR3)
20% 20% 25%
Town Residential 1-2 (TR1
and TR2)
10% 10% 15%
Town Residential 3 (TR3) 10% 20% 25%
Village Commercial (VC) Exempt Exempt Exempt
Town Center (TC) Exempt Exempt Exempt
Commercial (CC, IC, OC) Exempt Exempt Exempt
Public or Institutional (PI) 5% 5% 5%
Industrial (LI) Exempt Exempt Exempt
*This shall include the total area of a development, including properties involved in future
phases (i.e. The entirety of all property(s)) Example: A 10-acre property that is being
subidivded for a residential development within an SR1 Zoning District must allocated 20% or
(2 acres) to one or more of the open space types in Section 5.4.3.
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
14
b. Specific Requirements for Major Subdivisions
1. Amenity Centers: It is the intent of this section to provide residents of
sizable residential subdivision with quality amenities that add to the
livability and quality of life. Depending on how many lots are within a
residential subdivision, an amenity center shall be required. The
amount of area allocated to open space shall comply with the
percentages in Table 5.3.2.a. The Town classifies four types of amenity
centers, the requirements for each and their applicability requirements
are as follows:
a. Basic Amenity Center
i. Number of Lots: 10 to 49
ii. Open Space Type: Each development shall include a walking
trail (pervious or impervious), or connection to existing trail. A
covered picnic area with a minimum of 2 tables and a
designated area for recreation.
b. Standard Amenity Center
i. Number of Lots: 50 to 149
ii. Open Space Type: A park of a naturally beautiful space and/or
landscaped environment, including sitting areas, picnic tables,
and potentially covered spaces, anda play area withing a park
setting including swings, jungle gym, or other similar features.
Specific features shall be determined by Planning Commission
during preliminary plat review. Shall have an improved trail
within the development and connect to adjacent trails if
applicable.
iii. Recreation Facility: One type of sport court or field is required.
Examples include basketball, tennis, volleyball, pickleball or
tennis court, disc golf course, or other outdoor sport court or
filed greater than 1,743 sq.ft..
iv. Gated Boat Storage: If the development has water access to
Lake Murray, sufficient space shall be provided for the dry
storage of boats and boat trailers. The structure or area
dedicated to boat storage shall have sufficient landscaping
around the perimeter of the gated area, to be determined by
the Planning Commission. Additionally, this area shall have a
Type B buffer, as described in Section 7.3.2 when adjacent to a
residential lot.
c. Enhanced Amenity Center
i. Number of lots: 150 - 299
ii. Open Space Type: Two (2) play areas within a park setting,
including swings, jungle gym, or other similar feature as
determined by Planning Commission during preliminary plat
review. Play areas shall be equally spaces and should be no
more than 1,200’ linear feet from each other. Shall have an
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
15
improved trail within the development and connect to adjacent
trails if applicable.
iii. Recreation Facility: One type of sport court or field is required.
Examples include basketball or tennis court, disc golf course,
volleyball court.
iv. Clubhouse: Minimum of 1600 square feet, including an indoor
amenities such as a gym, sauna, and bathrooms or other similar
community amenities.
v. Swimming Pool: Minimum of 1800 square feet. Perimeter of
the pool area shall be landscaped and included in the overall
landscape plan.
d. Major Amenity Center
i. Number of lots: 300 or more
ii. Open Space Type: One play area per 150 lots that are not
separated by 1,200’ as measured by walking distance along a
sidewalk or trail. Play areas shall be developed within a park
setting, including swings, jungle gym, or other similar feature as
determined by Planning Commission during preliminary plat
review. Shall have an improved trail within the development
and connect to adjacent trails if applicable
iii. Recreation Facility: Two types of sport court or field is required.
Examples include basketball or tennis court, disc golf course,
volleyball court.
iv. Clubhouse: Minimum of 1600 square feet, including an indoor
amenity such as a gym, sauna, and bathrooms or other similar
community amenities
v. Community Facilities: The applicant shall consider space for
community facilities such as police and sheriff stations, fire
stations, schools, libraries, and other community services due to
the size of the development. The Planning Commission may
request that the applicant provide correspondence as part of
the record to ensure that these community services have been
contacted.
e. Exceptions
i. Additional or Non-Listed Amenities: Other types of amenities
may be submitted to the planning commission for consideration
to replace one of the required amenities listed above. Any open
space types in Table 5.4.3.a may be substituted for a similar
feature within this section if approved by the Planning
Commission.
ii. Conflicts: Any conflicts with other regulations within this
ordinance shall be resolved by the Planning Commission. If
there are conflicts with existing topographical features, utilities,
easements, or other type of hardship, a variance to these
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
16
requirements may be submitted. Variances to these provisions
shall have a recommendation by the Planning Commission first
prior to the hearing by the Zoning Board of Appeals.
5.3.3. Areas Counted Toward Open Space Requirement
a. The features and areas identified as counting toward open space shall be
credited towards compliance with the amount of open space required in
accordance with Section 5.4.2.a above.
Table 5.4.3.a: Open Space Features
Open Space Type Description
Parks A large public green area in a town, used for recreation or
gatherings.
Plaza An open space that may be improved, landscaped, or paved,
usually surrounded by buildings or streets.
Square Open space that may encompass an entire block, is located at the
intersection of important streets, and is set aside for civic
purposes, with landscaping consisting of paved walks, lawns,
trees, and civic buildings
Playground A land use designed principally to offer recreation, passive or
active, to the public
Community Garden A private or public facility for cultivation of fruits, flowers,
vegetables, or ornamental plants by the surrounding community.
Pedestrian Passageway A publicly accessible path that navigates between buildings or
developments to encourage pedestrian movement.
Greenway A linear park, alternative transportation route, or open space
conservation area that provides passive recreational
opportunities, pedestrian and/or bicycle paths, and/or the
conservation of open spaces or natural areas
Trail, or Trail Connection A way designed for and used by equestrians, pedestrians, and
cyclists using nonmotorized bicycles, sometimes a part of a local
or regional system.
b. The following areas shall not be counted as open space set-aside areas:
1. Private yards not subject to an open space or conservation easement;
2. Street rights-of-way or private access easements, including sidewalks
located within those rights-of-way or easements,
3. Open parking areas and driveways including parking lot landscaping;
4. Land covered by structures, unless accessory to open space features of
Table 5.4.3.a;
5. Outdoor storage areas; and,
6. Stormwater ponds not located and designed as a site amenity (e.g., with
low fencing, trails, vegetative landscaping, gentle slopes, fountain or
other visible water circulation device, and pedestrian access or seating).
5.3.4. Location
Open space shall be located to be easily accessible and useable by occupants
and users of the development. Where possible, a portion of the open space
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
17
should provide focal points for the development through prominent placement
or easy visual access from streets.
5.3.5. Configuration
a. Open space shall be compact and contiguous unless a different
configuration is needed to continue an existing trail or accommodate
preservation of natural features.
b. If the development site is adjacent to existing or planned public trails, parks,
or other public open space area, consideration should be given to adjoining,
extending, and enlarging the trail, park, or other public open space area.
5.3.6. Ownership and Management
a. All open space areas shall include deed restrictions, covenants, or other
legal instruments that ensure continued use of the land for its intended
open space purposes, in perpetuity, and provide for the continued and
effective management, operation, and maintenance of the land and
facilities.
b. Responsibility for managing and maintaining open space rests with the
owner of the land. Failure to maintain open space in accordance with this
Section and the development approval shall be a violation of this Ordinance.
5.3.7. Exemptions
The following development is exempted from the standards in this Section:
a. Residential development that creates fewer than 10 dwelling units;
b. Utility Uses;
c. Agricultural Uses; and
d. Industrial Uses
5.4. Alternative Development Patterns
5.4.1. Purpose: The alternative development options of this section allow for variety
in development standards while maintaining the overall character of a
neighborhood. These options have several public benefits:
• They allow for development that is more sensitive to the environment,
especially in areas;
• They allow for the preservation of open and natural areas;
• They promote better site layout and opportunities for private recreational
areas;
• They promote opportunities for workforce housing by allowing for a mixture
of lot and building sizes, and
• They promote energy-efficient development.
5.4.2. Applicability: The developer or applicant desiring to use these alternative
development patterns within this section shall comply with the Major
Subdivision application requirements.
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
18
5.4.3. Conflict With Other Regulations: If there is a conflict between the requirements
for alternative development patterns and any other requirement of this
Ordinance, the standards of this section take precedence, otherwise these
alternative development patterns are subject to all other applicable
requirements of this Ordinance.
5.4.4. Conservation Subdivision
a. Purpose: The use of conservation subdivision design seeks to optimize land
use in and around the Town of Chapin, while maintaining a balance
between the preservation of agriculturally, environmentally and historically
significant areas and allowing reasonable and sustainable growth to
continue in the Town. New development shall avoid disturbance of areas or
elements defined as “sensitive” or “significant”. The use of conservation
subdivision design shall not be required, but is encouraged for use on
residential subdivisions:
1. Of less than 20 lots;
2. Of less than 15 acres;
3. Not located in certain identified areas of conservation (sensitive area
overlay zones/districts);
4. With less than fifty percent (50%) of the parcel identified as
agriculturally, environmentally or historically significant.
b. Application: The developer/applicant shall supply a completed subdivision
application (Section 10.9, Major Subdivision) to the Administrator which
shall include a draft of the conservation easement for the portion of the
property that will remain as permanent open space or agricultural land and
a fully dimensioned site plan, drawn to scale, which shall demonstrate,
delineate, and label all of the following:
1. Topography, including areas to be graded, earth movements, drainage
provisions, existing contour lines and any proposed new contour lines
and any other significant topographical features.
2. The location and type of sensitive areas deemed to be of agricultural,
environmental, or historical significance, as defined in Appendix I:
Definitions of this Ordinance. All construction contracts shall include
language protecting sensitive areas, agricultural land, areas of
conservation, and areas containing sensitive elements.
3. The location and type of all proposed areas to be preserved as open
space or agricultural land, including areas of mitigation and
preservation. These areas shall be marked for identification upon site
inspection.
4. Existing zoning, land use(s), and approximate density of residential uses.
5. Septic or waste water provisions as provided by SCDHEC.
6. For areas of agricultural preservation, a buffer strip of at least seventy-
five (75) feet must be delineated. When possible, existing woodlands
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
19
should be used, if not, a variety of rapidly growing indigenous trees and
shrubs should be planted thickly in the buffer strip.
7. Any other provisions not specifically required or excluded herein, as
required by this Ordinance.
c. Density: The density allowed by the parcel’s zoning unless a density bonus is
awarded to the developer by the Town of Chapin Planning Commission.
1. Density Bonuses: Density bonuses may be awarded to developers who
dedicate land for public use, such as trails and parks. Additionally,
density bonuses may be awarded for the provision of affordable or
workforce housing for low to moderate income families.
d. Open Space Requirements: A minimum of fifty percent (50%) of the parcel
must be designated as permanent open space.
1. Ownership of Open Space: Shall be protected by a conservation
easement held by the homeowners association, local conservation
commission, land trust, or Town of Chapin that is recorded in the office
of the County Registrar of Deeds. The owners of the open space are
responsible for the payment of any taxes, upkeep, insurance, and any
other responsibilities associated with “ownership” of the land
2. Usable Open Space: At least half of the required open space shall be
useable for agricultural or recreational purposes.
e. Final Plat Requirements
1. In addition to the final plat requirements conditioned by subdivision
approval by the Planning Commission, and requirements in Article 10.
Included with the final plat, the subdivider shall submit a subdivder’s
agreement regarding the liability for and maintenance of the open
space. In addition, the subdivider must include a conservation
easement/open space covenant protecting the open space from any
further development.
f. Appeals
1. Any appeals to the decision regarding this section shall follow the
appeal process outlined for subdivision applications (Article 10).
Manufactured Home Park
Compliance with all other regulations: Compliant with conditional standards in Article 4
5.4.5. Group Development
a. Purpose and Intent
In order to prevent creation of traffic hazards, insure the provision of off-
street parking and provision of necessary utilities, plans for group
developments such as shopping centers, industrial parks, mobile home
parks, apartment complexes, and motels where the site is not subdivided
into lots and public streets, but is retained in one ownership, the site plan
shall be submitted to the Planning commission for review and approval.
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
20
These regulations are considered minimum and may be superseded by
more restrictive regulations such as the zoning ordinance.
b. Types of Group Developments
1. Group commercial or industrial developments consist of more than one
commercial or industrial structure erected on a single lot.
2. Group housing developments consist of Any structure containing more
than four dwelling units on the first-floor level thereof or containing
more than eight dwelling units throughout, except that high rise
apartments are not considered to be group housing developments. Or
More than one structure containing dwelling units erected on a single
lot.
c. Application Process: The developer/applicant shall supply a completed
subdivision application (Section 10.9) to the Town of Chapin. In addition,
the following shall be required, unless otherwise determined by the
administrator:
1. Site Analysis consistent Section 10.3.1.a
2. Site Plan consistent with all relevant information detailed in Section
10.3.1.c.
3. Traffic Impact Study consistent with the requirements of Section 5.6
4. Construction Documents consistent with Section 10.3.1.d.
d. General Standards for Group Developments: In addition to other
requirements within this Section, the applicant shall demonstrate
compliance with the following:
1. Conformance with Ordinance: The submitted applications shall be
compliance with standards and requirements for parking, signage,
setbacks, spacing between buildings, residential area requirements,
screening, buffers, and landscaping for group developments.
2. Water, Sewer, and Drainage: Adequate provisions for water supply,
sanitary sewerage, and storm drainage shall be installed by the
developer according to the plans and specifications approved by the
proper authorities.
3. Access and Egress: shall conform to the Driveway Regulation of the
South Carolina Department of Transportation, the Town of Chapin’s
Unified Development Ordinance (UDO), and the Traffic Impact Study
findings.
4. Manufactured Homes: Shall comply with all relevant provisions for
manufactured homes and manufactured home parks, if applicable.
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
21
5. Enforcement: No building permits shall be issued and no connection to
a public water system or public sewer system shall be made until the
construction drawings for the group development are approved by the
Planning Commission staff and so noted on prints of the development
plan.
5.4.6. Planned Developments (PD)
a. Purpose and Intent: The PD is intended to encourage innovative land
planning and site design concepts that cannot be achieved by other
mechanisms provided by this Ordinance. PDs should achieve a high level of
environmental sensitivity, aesthetics, high quality development and other
community goals by:
1. Allowing greater freedom in selecting the means to provide access,
open space and design amenities.
2. Promoting quality urban design and environmentally sensitive
development by allowing development to take advantage of special and
unique site characteristics, locations, building types and land uses.
b. Process and Applicability
1. PDs are considered a two-step process. First, there is a Rezoning which
follow the general procedures of Article 10. Second, a Final Plat
approval, per Article 10 shall occur. A complete master plan and written
report shall be developed and submitted for approval as part of the
rezoning process in order to determine the desired standards and
design of the project. Those documents shall be submitted in
accordance with the following standards:
a. Master Plan: Applicants shall first develop and present a master
plan, complying with the Sketch Plan requirements in Article 10, for
the entire parcel which includes, but is not limited to:
i. Size: Size, in acres, shall be listed on the master plan. For
redevelopment sites, or sites that have been previously
improved or have existing buildings and/or structures presently
on the property. PDs for these redevelopment sites shall have a
minimum of 4 acres. For all other developments PDs shall have
a minimum of 10 acres. If the project is intended to be
developed in phases, the master plan shall include all phases.
ii. Districts: Land allocations by zoning district, including specific
modifications to the Ordinance requirements of those districts
clearly highlighted.
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
22
iii. Street Layout and Regulating Plan: the design and location of
the streets shall be provided. Streets shall conform with the
street sections in Article 5 of this Ordinance. Additional bicycle
and pedestrian circulation shall also be indicated.
iv. Lot Layout: Proposed subdivisions of property, required open
space, street regulating plan, neighborhood structure(s). The PD
shall have provisions to allow for a systematic methodology to
provide a variety of lot sizes.
v. Open Space: Open space requirements are 1.5 times the
standards set in Article 5 with the exception that a minimum of
10% open space is required for all PDs, regardless of size or
zoning district. These should be clearly indicated on the master
plan.
vi. Stormwater Requirements: Stormwater shall be considered on a
PD-wide basis and the general locations shall be indicated.
Floodplain information shall also be included on the master
plan.
vii. Resources: The general location of all historic, cultural, and
environmentally sensitive resources shall be depicted on the
master plan.
b. Written Report: A written report shall be submitted to explain the
type, nature, intent and characteristics of the proposed
development, and shall specifically include:
i. Site Description: A general description of the proposal, including
a detailed description of the site, location, context, and any
cultural, environmental and/or historic resources.
ii. Vision Statement: The goals, tenets, any special initiatives which
the development intends to achieve shall be clearly identified
for review and discussion.
iii. Incompatibilities: A detailed description of the provisions of the
Ordinance which prevent the development, as desired shall be
provided. This shall include analysis showing how the general
Land Development standards in Article 5, Permitted Use Table
in Article 4, and Zoning Districts in Article 3 limit the intended
development.
iv. Modification to Ordinance: A detailed description of exceptions
or variations from the requirements of this Ordinance, per the
incompatibilities listed above. All items not explicitly listed as
modifications will be subject to the requirements of this
Ordinance.
v. Land Allocation: Tables showing the total number of acres in the
proposed development and the percentage designated for each
proposed type of land use, including open spaces, recreation
areas, public facilities, wetlands and wetland impacts. This
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
23
should be coordinated with the Districts as shown in the master
plan. If the development is intended to be phased, the phasing
plan shall be indicated on the tables. Residential density at 16
d.u./acre?
vi. Program: A complete development program, including number
of residential units and proposed densities, building types,
minimum and maximum lot sizes, and square feet and
identification of other nonresidential uses.
vii. Building Design Standards: guidelines to achieve aesthetics and
high-quality development shall be included. These may be
further detailed in the covenants after all Town approvals have
been secured.
viii. Compatibility Statement: A statement of how the proposed
development is consistent adopted plans and documents of the
Town of Chapin or Lexington County.
ix. Traffic Impact Study (TIS): A Traffic Impact Study to be
performed as outlined in Section 5.6.
x. Other: Additional relevant information as requested by the
Administrator.
c. Performance Guarantee: Before approval of a PD, the Town Council
may require a contract with safeguards satisfactory to the Town
guaranteeing completion of the development plan in a period to be
specified by the Town, but which period shall not exceed 5 years
unless extended by the Town for due cause show. Such guarantee
may include the submission of a performance bond in an amount
set by the Town.
d. Final Plat: Upon approval of the Rezoning (inclusive of the master
plan), the applicant shall proceed towards approval of a Final Plat
Article 10.
2. Expiration of Approval: The Town shall have the right to review a
concept plan approved as part of a PD when no building permits have
been issued in the past 5 years, and may choose not to issue further
permits within the PD until a revised concept plan has been approved.
5.4.7. Previously Approved Planned Developments
a. Purpose: The intent of this section is to be utilized only for the continuation
of previously established and approved Planned Developments before the
enactment of this Ordinance.
b. Minor Plan Amendments Permitted by the Administrator: The amendment
of previously approved PDs shall be approved by the Administrator, if the
amendment results in a development intensity that is no greater than the
previously approved intensity in terms of total square feet, total number of
units, height, and build-upon area. Additionally, a minor plan amendment
shall be limited to technical considerations that could not be reasonably
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
24
anticipated during the approval process, or any other change that has no
material effect on the character of the approved PD development or any of
its approved terms or conditions.
c. Major Plan Amendments Permitted by Town Council Approval Only: All
major changes not subject to the section above, shall be reviewed by the
Planning Commission (PC) and approved by Town Council in accordance
with the procedures outlined in Section 5.5.6.b.
d. Any existing PD may choose to rezone to a standard Town zoning district by
going through the rezoning process in accordance with the procedures
outlined in Article 10.
5.5. Traffic Impact Study
5.5.1. Applicability
An impact study shall be required if a proposed project:
a. Produces 50 peak hour (AM, PM, or Midday) two-way trips or more; or
b. Produces 500 daily (24 hour) two-way trips or more; or
c. Expansion of existing development that would produce additional traffic,
meeting or exceeding the thresholds within this section. When determining
whether the project meets the threshold, trips from the existing land use
shall be included in the trips that are considered “produced” by the project.
5.5.2. Application Process
A TIS shall be completed as the first step of the project approval process. Prior
to the submission of any TIS and preliminary plat, the applicant shall complete
and submit a Traffic Impact Study Requirement Evaluation form obtained from
the Administrative Official’s office. The Town’s Transportation Engineer will
evaluate the request and determine whether a TIS is required. The TIS is the
responsibility of the applicant. The TIS shall be prepared in accordance with the
Traffic Impact Study Guidelines adopted by the Town of Chapin and obtained
from the Administrative Official’s office. All traffic studies must be prepared
under the supervision of, and signed, stamped and dated by, a professional Civil
Engineer registered in South Carolina. Coordination with other entities in the
county government or South Carolina Department of Transportation (SCDOT)
shall be the responsibility of the applicant. The applicant will be required to use
a Town approved firm to complete the TIS. A list of approved consulting firms
will be provided upon the determination that a TIS is required. All phases of a
development are subject to review, and all traffic plans for the entire
development shall be integrated with the overall traffic analysis.
5.5.3. Contents Traffic Impact Study (TIS)
a. Study Contents: At minimum a TIS shall include the following:
8/15/23 MRB Draft. Updated with UDO SC Comments - RG
25
1. Introduction: A written narrative describing the proposed land use(s),
size, and projected opening date of the project and all subsequent
phases.
2. Existing Land Use
3. Proposed Land Uses
a. Location and context
b. Description of development
c. Zoning Characteristics
d. Site Plan
4. Analysis
a. Existing traffic volumes on all roads to be accessed using current
SCDOT Annual Average Daily Trip (AADT) counts where possible.
b. Infrastructure Analysis
c. Trip generation tables
d. Trip distribution patterns
e. Turning movement diagrams for peak hours
f. Access analysis
g. Traffic Control Devices
h. Mitigation and Alternatives
i. Summary
b. Responsibility for Costs of Improvements: The costs of implementation of an
approved mitigation program shall be the responsibility of the applicant. No
certificates of zoning compliance or building permits shall be issued unless
provisions of the TIA are met
8/15/23 MRB Group Version_4
Article 3 Zoning Districts and Boundaries
3.0 Zoning Districts and Boundaries
3.1 Purpose and Intent
For the purposes of this Ordinance, the various districts have been categorized as
Conventional Districts, Planned Developments, and Overlay Districts. Each district is
established as a specific and exclusive zoning district, and only those uses that are listed
as permitted are allowed. If a particular use of the land is not mentioned for a
certain district, that use shall be prohibited for that district unless the change is by
official amendment approved by Town Council.
3.2 Official Zoning Map
The Official Zoning Map shall be maintained in the Office of the Zoning Administrator. A
duplicate official Zoning Map shall be kept in the office of the Town Clerk. All zoning
district boundaries shall be clearly shown on the Zoning Map, and amendments shall be
recorded immediately after adoption. The official copies of the Zoning Map shall be
dated and attested by the Town Clerk, and shall be available for public inspection. The
official Zoning Map and any amendments adopted by Town Council shall constitute the
final authority for determination of zoning district boundaries. It shall be unlawful for
any person to make unauthorized changes to the Zoning Map.
3.3 Interpretation of District Boundaries
When there is any uncertainty as to the intended locations of any zoning district
boundary on the Zoning Map, the Town Staff shall make an interpretation of such map
upon request of any person. Any person aggrieved by any such interpretation may
appeal such interpretation to the Board of Zoning Appeals. The Town Staff, and the
Board of Zoning Appeals, in interpreting the Zoning Map or deciding any appeal shall
apply the following standards:
• Boundaries indicated as approximately following the centerlines of streets,
highways or alleys shall be construed as following such centerlines:
• Boundaries indicated as approximately following platted lot lines shall be
construed as following such lot lines;
• Boundaries indicated as approximately following political boundaries shall be
construed as following such boundaries;
• Boundaries indicated as following railroad lines shall be construed to be midway
between the main tracks or to follow the centerline of single tracks;
• Boundaries indicated as following the centerlines of waterways, marshes or
ditches shall be construed as following such lines;
• Boundaries indicated as parallel to or extensions of features shall be so
construed. Distances not specifically indicated on the Official Zoning Map shall
be determined by the scale of the map; and
8/15/23 MRB Group Version_4
• Where physical or cultural features existing on the ground are at variance with
those shown on the Official Zoning Map, or in other circumstances not covered
by this section, the Board of Zoning Appeals shall interpret the district
boundaries.
3.4 Lot Divided by District Boundaries
No structure or accessory use may be placed, structurally altered, or have a change in
use where the structure or use is or would be included within two or more
zoning districts unless such structure or use conforms to the requirements of all
applicable district regulations.
3.5 Changes
3.5.1 Changes made to zone boundaries or other matters portrayed on the Zoning
Map shall be made in accordance with Article 10, Amendments and Rezonings.
3.5.2 The Administrator shall enter changes onto the Zoning Map within a reasonable
period of time after a map amendment is approved by the Town Council. Where
the ordinance enacting a zone boundary change contains wording explaining or
clarifying the location of the new boundary, the Administrator may enter
notations on the Zoning Map reflecting the ordinance wording.
3.5.3 No changes of any nature shall be made to the Zoning Map or matter shown
thereon except in conformity with the procedures set forth in this Ordinance.
Any unauthorized change of whatever kind by any person or persons shall be
considered a violation of this Ordinance and punishable as provided by law.
3.5.4 Regardless of the existence of purported copies of the Zoning Map that may
from time to time be made or published, the Zoning Map which shall be located
in the Department of Planning, shall be the final authority as to the current
zoning status of land and water areas, buildings, and other structures in the
Town, except in the case of proven errors.
3.5.5 The Administrator shall maintain copies of superseded versions of the Zoning
Map for historical reference.
3.5.6 Where Town limit boundaries change by virtue of annexation or some other
means, the following provisions shall apply:
a. Areas to be annexed into the incorporated limits of Chapin shall be assigned
zoning classifications by the Town Council.
b. In all cases where additions to the Town’s total area require adjustments in
the zoning district boundaries, the adjustment shall be made to the Zoning
Map.
c. When reductions are made in the Town’s total incorporated area the
provisions of this Ordinance shall no longer apply to that area.
3.6 Establishment of Zoning Districts
The following zoning districts are herby established:
(CONTINUED ON NEXT PAGE)
8/15/23 MRB Group Version_4
Zoning District and Description Illustration
(RA) Rural Agricultural District: The
intent of the RA district is to establish
and preserve areas primarily
for agriculture and rural dwellings,
forest management and various other
low density (.2 d.u./acre) uses on large
sites, and to encourage preservation
of natural resources and guard against
the premature or unreasonable
alteration of land resources. This
district may be utilized for areas
annexed by the Town to preserve the
existing rural characteristics, and to
prevent urban sprawl.
RR, Rural Residential District: RR
districts are intended to limit high
density development (.5 d.u./acre),
and to protect natural and agricultural
areas by limiting and regulating
commercial development.
SR1, Suburban Residential District 1:
SR1 districts are intended to be single
family residential areas with detached
units and low population densities (1
d.u./acre).
SR2, Suburban Family Residential
District 2: SR2 districts are intended to
be single family residential areas with
detached units and low population
densities (2 d.u./acre).
8/15/23 MRB Group Version_4
SR3, Suburban Family Residential
District 3: SFR3 districts are intended
to be the medium density (4 d.u./acre)
single family residential areas with
detached units.
TR1, Town Residential District 1: TFR
districts are intended for medium
density (6 d.u./acre) residential
purposes, including single family
detached units, duplexes, and
triplexes. These uses shall be
compatible in size and scale with
surrounding residential development.
TR2, Town Residential District 2: The
purpose of this district is to provide
for a mixture of single-family, two-
family, triplexes, and other residential
uses except multifamily, on smaller
lots with a variety of setbacks as well
as the location of higher density
dwellings (8 d.u./acre) such as zero lot
line homes and rowhome
developments.
TR3, Town Residential District 3: The
purpose of the TR3 (12 d.u./acre)
district is to establish and preserve
multifamily residential uses designed
to encourage and continue a stable
and healthy environment for
residential uses and to exclude uses
which are not compatible with such
residential uses.
8/15/23 MRB Group Version_4
VC, Village Commercial District: (12
d.u./acre) VC districts are intended for
commercial and service uses oriented
primarily to serving needs of persons
who live or work in nearby areas. A
variety of mixed-density residential
uses are permitted when paired with
commercial uses.
TC, Town Center District: (16
d.u./acre) The intent of
the Town Center (TC) zoning district is
to provide an area for development of
an attractive, compact, walkable,
mixed-use town center that creates a
live/work/play environment for the
community.
PI, Public/Institutional District: The PI
district supports generally non-
residential institutions and
employment areas that are designed
in a campus-like setting, such as
hospitals, universities, research
facilities, and offices. It is intended to
ensure that these unique institutions
are designed to be compatible with
their surroundings and the rest of the
Town.
CC, Corridor Commercial: It is the
intent of this section that the CC
zoning district be developed and
reserved primarily as a retail service
and commercial area, serving
surrounding neighborhoods and larger
community or town-wide clientele
with a wide range
of commercial services, including
retail, offices and business support
services located in areas which are
well served by collector and arterial
street facilities as well as pedestrian
access facilities where appropriate.
8/15/23 MRB Group Version_4
IC, Interstate Commercial District: IC
districts are intended to provided
businesses that serve the traveling
public along I-26 such as restaurants,
gas stations and hotels/motels, as well
as large scale retail and service
establishments.
OC, Office Commercial: OC districts
are intended to accommodate a
variety of commercial and
nonresidential uses characterized
primarily by retail, office and service
establishments not in the central
business area.
LI, Light Industrial District: LI districts
are intended to permit light
manufacturing, industrial, wholesale
commercial uses which do not create
nuisances by noise or emissions
beyond the premises.
PD, Planned Development District: PD
districts designate an area for which
an approved development plan
constitutes the district regulations. It
is intended to utilize the factors of
efficiency, economy, flexibility,
creative site design, improved
appearance, compatibility of mixed
uses, maximum benefits from open
space, safe and efficient vehicular and
pedestrian access for a development
characterized by a unified site design
for mixed uses. A planned
development district may be
predominately residential or
predominately commercial.
(Source: Laurel Island PUD, Charleston)
8/15/23 MRB Group Version_4
PO, Parks/Open Space District: The
open space district is established as a
district in which the primary use of the
land is predominantly reserved for
flood control, future thoroughfare
right-of- way, public recreation,
community facility sites, airport
approaches, natural or man-made
bodies of water, forests, and other
similar open space uses.
3.7 District Development Standards
(ON NEXT PAGE)
8/15/23 MRB Group Version_4
DISTRICT RA RR SR1 SR2 SR3 TR1 TR2 TR3 VC TC PI CC IC OC LI PO
LOT CONFIGURATION
Lot Width, Minimum 200' 100' 75' 60' 50' 40' 40' 50' 40' None 50' 50' 50' 50' 75' None
Lot Size, Minimum 5 acres 2.5 acres 1 acre .5 acre .25 acre 6,000 sq. ft. 6,000 sq. ft 6,000 sq. ft. 4,000 sq. ft. None None None None None 10,000 sq. ft. None
Maximum Lot Coverage 25% 25% 25% 30% 45% 70% 70% 75% None None None 70% 70% 70% None None
Maximum Density 0.2 d.u./acre 0.5 d.u./acre 1 d.u./acre 2 d.u./acre 4 d.u./acre 6 d.u./acre 8 d.u./acre 12 d.u./acre 12 d.u./acre None N/A N/A N/A N/A N/A N/A
PRINCIPAL BUILDING PLACEMENT
Front Setback, minimum 50' 50' 25' 25' 25' 15' 10' 0' 0' 0' 25 15 15 25 15 None
Front Setback, maximum* None None None None None 25' 25' 25' 15' 10' None None None None None None
Side Setback (Corner) 20' 20' 10' 10' 10' 10' 10' 10' None None 10' 15' 15' 15' None None
Side Setback 20' 20' 10' 10' 10' 10' 10' 10' None None 10' 15' 15' 15' None None
Rear Setback 20' 20' 20' 20' 20' 15' 15' 10' 10' None 25' 25' 25' 25' 25' None
Building Height 50' 50' 35' 35' 35' 35' 35' 50' 35' 50' 65' 65' 65’ 50' 65' N/A
ACCESSORY BUILDING PLACEMENT
Front Setback** None None 0' 0' 0' 5' 5' 5' 10' 10' 0' 10' 10' 10' None None
Side Setback (Corner) 10' 10' 5' 5' 5' 5' 5' 5' 5' None 5' 5' 5' 5' 5' 5'
Side Setback 10' 10' 5' 5' 5' 5' 5' 5' 5' None 5' 5' 5' 5' 5' 5'
Rear Setback 10' 10' 5' 5' 5' 5' 5' 5' 5' None 5' 5' 5' 5' 5' 5'
Height***
*A minimum of 80 percent of the front façade must be located within the maximum front setbacks
**The front setback for accessory buildings shall start at the principal façade of the principal use.
***The height of an accessory building shall not be greater than the height of the principal building, unless located in a Public Institutional (PI) or Light Industrial (LI) zoning district.
8/15/23 MRB Group Version_4
3.8 General Lot and Building Standards
3.8.1 Standards Not Exclusive
In addition to the lot and building provisions in this article, standards for lots
and buildings in related building and fire codes may also apply.
3.8.2 Interpretation of Fractional Measurements
When any requirement of this ordinance results in a fraction of a unit, a fraction
of ½ or more shall be considered a whole unit and rounded up to the nearest
whole number.
3.8.3 General Lot Standards
a. Lot Occupancy: No building shall hereafter be erected, altered or moved to
occupy a greater percentage of lot area than is permitted within the zoning
district in which it is or will be located.
b. Lot Reduction: No lot shall be reduced in size which will not maintain the
total lot area, lot width, necessary yards, courts or other open space, lot
area per dwelling unit or other requirements of this article.
c. Yard Use Limitations: No part of a yard, court or other open space or off-
street parking required in connection with any building for the purpose of
complying with the regulations of this article shall be included as part or all
of the required yard, court, or other open space or off-street parking for
another building or structure, except as provided in this article.
3.8.4 Lot Setbacks
a. Irregular Lots: The location of required setbacks on irregularly shaped lots
shall be determined by the Town Staff in accordance with the following
provisions:
1. Irregular Lot Lines: Generally, side lot lines shall be perpendicular or
radial to the street right-of-way, and rear lines should be approximately
parallel to fronting right-of-way lines. Irregularly shaped lots shall be
permitted at the discretion of the Administrator when unique site
conditions exist.
2. Irregular Lot Setbacks: The location of required front, side, and rear
yards (or setbacks) on irregularly shaped lots shall be determined by the
Administrator, based on the prevailing spacing of buildings on the
adjacent parcels. Where questions arise as to appropriateness, the
applicant may be requested to provide additional design information.
b. Double- and Triple-Frontage Lots: On lots with two street frontages, not
located at a corner, or with three frontages and located at a corner, the
front setback will apply to both the street that the building derives its
address from, in addition to the opposite, parallel street. This does not
apply to lots located on a corner with a rear alley. Double- and Triple
Frontage lots shall base their setback regulations based on the street that it
derives its address from. Double frontage lots shall be avoided except in
commercial zones, where essential to provide separation of residential
8/15/23 MRB Group Version_4
development from railroad or major street right-of-way or from
non-residential uses or where necessary due to topography. Where a
railroad or major thoroughfare right-of-way, as shown on the major
thoroughfare plan, abuts or runs through any portion of the subdivision, the
subdivision plat shall provide for either a minor street or lots backing onto
said right-of-way having a minimum depth of two hundred (200) feet
c. Flag Lots: The use of flag lots in residential subdivisions shall be permitted
only if dictated by the terrain. Flag lots shall not be permitted to solely
allow an increase in the number of lots. The access drive to a flag lot shall
have a minimum width of 30 feet and shall be a deeded part of the lot so
accessed. No two flag lots may abut or converge at the (poles) street right-
of-way
d. Corner Lots: Corner lots shall be at least five (5) feet wider than interior lots;
provided however, the maximum required width of corner lots shall be one
hundred (100) feet (need dimensional standards footnote). The minimum
side building setback distances shall be at least the minimum front building
setback distance for the side adjacent to the street
e. Setbacks from Designated Corridors: Setbacks shall be measured from the
future right-of-way established for specifically-designated streets in an
adopted corridor plan or subdivision if the adopted plan shows, at a
minimum, the horizontal alignment of the future roadway, pedestrian and
bicycle amenities, streetscape improvements and necessary right-of-way,
and other applicable requirements.
f. Residential variances and restrictive covenants: The Town Staff shall only
grant an Administrative Adjustment (Section 10.8) for a lot size or setback
requirement that conforms to the restrictive covenants of a subdivision
existing at the time of the adoption of this chapter or at the time of
annexation into the town.
3.8.5 Infill Lot Setbacks
In certain neighborhoods, historic setbacks do not conform to current
standards. It is the intent of the UDO to create predictability within blocks and
not reduce or enlarge setbacks where existing precedents are present. The
Town Staff shall have the authority to determine setback for infill lots to ensure
compatibility with adjacent structures unless superseded by an adopted plan
3.8.6 Encroachments
The features listed below shall be permitted to encroach into a required yard or
right-of-way, as applicable. Nothing in this section shall be misconstrued to
conflict with any other portion of this Ordinance.
a. Encroachment over Sidewalks: With approval of the City, county or SCDOT
(whichever has authority over a street), awnings, arcades, canopies, and
galleries, may encroach over the sidewalk to within 2 feet of the curb, but
they shall provide a vertical clearance of at least 8 feet from any sidewalk.
8/15/23 MRB Group Version_4
This encroachment is only permitted in the Town Center (TC), Village
Commercial (VC), and Town Residential Districts (TR1, TR2, and TR3).
b. Upper Story Encroachments: Bay windows, balconies, and similar features
projecting from the principal building may encroach up to 50% of the depth
of the front and street side setback. With approval of the City, county or
SCDOT (whichever has authority over a street), upper-story balconies or bay
windows may encroach over the right-of-way a maximum of 3 feet, but they
shall provide a vertical clearance of at least 8 feet from any sidewalk. This
encroachment is only permitted in the Town Center (TC), Village
Commercial (VC), and Town Residential Districts (TR1, TR2, and TR3).
c. Lower Story Encroachments: Cornices, eave overhangs, chimneys, flues, bay
windows, and similar projections (including gutters) may encroach up to 2
feet into any required yard.
d. Covered Porches: Covered porches may encroach a maximum of 8 feet into
any required front yard or street side yard setback and to within 5 feet of
any interior side or rear yard property line.
e. Uncovered Porches, Decks, Patios, Steps and Stairs: Uncovered and
unenclosed porches, decks, patios, steps and stairs, and other similar
features may encroach to within 5 feet of any interior side and rear
property line. Steps and stairs may encroach up to 100% of the depth of any
required street yard setback, but may not encroach upon any public
sidewalk.
f. Walkways and Driveways: Uncovered and unenclosed walkways, and
driveways may encroach up to 100% of the depth of any required setback,
unless a buffer (Section 7.3.2) is required.
g. Handicap Ramps and Lifts: Ramps, lifts, fire escapes, or other required
accessibility structure by the fire or building code that is attached to the
exterior of a building may encroach into any required yard but may not be
closer to any property line than 5 feet. Such features shall not be located in
a front yard if it is possible to accommodate them in a side or rear yard.
h. Mechanical Equipment: Mechanical equipment such as pool pumps,
ventilation systems, heating and air conditions units, tv antennas, and
satellite dishes, and other similar equipment determined by the
administrator, may encroach up to 25% into a required side or rear yard.
Mechanical Equipment shall comply will screening requirements in Section
7.3.9.
i. Fences and Garden Walls: Fences and garden/yard walls may encroach into
required setbacks. The support structures for fences shall be located on the
inside of the fence, and no fence, wall or hedge shall exceed the following
dimensions:
1. In all districts fences within the front or street side setback shall be a
maximum of 4’ in height.
8/15/23 MRB Group Version_4
a. In the Light Industrial (LI) zoning district parcels fronting a Primary
Street may have fences or walls up to 6 feet in height. Parcels
fronting all other streets may be up to 10 feet in height.
b. When residential uses are adjacent to commercial, industrial, or
other nonresidential use, the administrator may increase this height
requirement to 7’.
2. Side or rear setback of residential districts: Privacy fences or walls may
be a maximum of 8’ in height.
3. Side or rear setbacks of nonresidential and industrial: Fences or walls
may be a maximum of 10’ in height.
j. Mailboxes: Mailboxes may encroach into a front setback area.
3.8.7 Measurement of Height
a. Building Height: Building height is measured as the vertical distance from
the mean grade elevation taken at the fronting street side of a structure to
the roof line of a flat roof, the ridge of a pitched roof, or the deck line of a
mansard roof.
b. Under-roof areas with dormers shall be counted as half-stories.
c. Exemptions from Building Height Requirements: Unless specifically stated
otherwise elsewhere in this ordinance, the height requirements established
in this ordinance shall not apply to:
1. Building elements (such as church spires, towers, cupolas, domes, etc.)
not intended for human occupancy;
2. Structures that are an accessory to institutional uses (such stadium
press boxes);
3. Water towers, transmission towers, and observation towers, unless
otherwise regulated in this ordinance;
4. Flagpoles, masts, and antennas (not otherwise regulated elsewhere);
and
5. Mechanical penthouses not exceeding 15 feet in height which are set
back at least 20 feet from the front elevation of the building, and not
visible from view from the public right-of-way.
d. Other Height Requirements: Height requirements for signs, lighting,
landscape screens, and all other structures or objects for which a
dimensional height requirement is established by this ordinance shall be
measured as the vertical distance from the highest ground level at the
structure or object’s foundation to its highest point.