CHAPIN UNIFIED ZONING & DEVELOPMENT ORDINANCE
STEERING COMMITTEE SPECIAL CALLED MEETING
Council Chambers, Chapin Town Hall
August 1, 2023
3:00 P.M.
AGENDA
Call to order
Freedom of Information Act Compliance
Approval of Minutes
1. June 6, 2023 Meeting Minutes
2. June 15, 2023 Meeting Minutes
3. July 11, 2023 Meeting Minutes
New Business
4. Draft Review
a. Article 5: Land Development Standards
Adjourn
TOWN OF CHAPIN
UNIFIED DEVELOPMENT ORDINANCE COMMITTEE
MEETING MINUTES
Thursday June 6, 2023 Town Hall
2:00 P.M.
Members Present: Planning Commission Members Rae Davis, Caleb Pozsik, Yvonne Hudson
Members Absent: Clay Cannon
Staff Present: Planning and Zoning Manager Kevin Singletary, Town Clerk Shannon Bowers
Staff Absent: Town Administrator Nicholle Burroughs, Mayor Al Koon
Guests: Riccardo Giani - MRB Group (via Zoom)
Call to Order: Chair Davis called the meeting to order at 3:05 p.m. and acknowledged the appropriate
notifications in compliance with the SC Freedom of Information Act had been met.
New Business
Draft Review – Article 8: Parking & Loading: Mr. Gianni began the discussion by stating that the drafts for
review included notes and comments from the committee and staff. He then went through the document,
highlighting sections that he felt the committee would need to discuss further.
Most changes in this article were grammatical in nature or format related. The committee discussed the
following changes: including language to address additional parking for areas that change uses (Mr. Gianni will
research the international building code for “standard language” for this point), include definition for asphalt,
parking requirements in front of residential structures, parking of commercial or recreational vehicles in
residential areas, minimum number of off street vehicle parking spaces as they relate to single family and multi
family dwellings (with the possibility to address in the zoning districts), off site satellite parking, and design
standards for on site pedestrian access in parking lots.
Mr. Singletary noted that due to time constraints, the committee would be discussing Article 9 at the next
committee meeting on June 15, 2023 at 2:00 p.m.
Adjournment: Member Hudson moved to adjourn the meeting. Vice Chair Pozsik seconded the motion.
Meeting was adjourned at 4:52 p.m.
UDO COMMITTEE APPROVED (Date):
Rae Davis, PC Chair
ATTEST:
Shannon Bowers, Town Clerk
TOWN OF CHAPIN
UNIFIED DEVELOPMENT ORDINANCE COMMITTEE
MEETING MINUTES
Thursday June 15, 2023 Town Hall
2:00 P.M.
Members Present: Planning Commission Members Rae Davis (via Zoom, and left the meeting at 4:39 p.m.),
Caleb Pozsik, Yvonne Hudson, Clay Cannon (arrived at 2:43 p.m.)
Staff Present: Planning and Zoning Manager Kevin Singletary, Town Clerk Shannon Bowers (via Zoom)
Staff Absent: Town Administrator Nicholle Burroughs, Mayor Al Koon
Guests: Riccardo Giani - MRB Group (via Zoom)
Call to Order: Chair Davis called the meeting to order at 2:13 p.m. and acknowledged the appropriate
notifications in compliance with the SC Freedom of Information Act had been met.
Approval of Minutes
Member Hudson moved to approve the May 18, 2023 meeting minutes as presented. Vice Chair Pozsik
seconded the motion. No further discussion. Motion passed unanimously.
Chair Rae Davis: Yes
Member Yvonne Hudson: Yes
Vice Chair Caleb Pozsik: Yes
New Business
Draft Review – Article 9: Signs: Mr. Gianni began the discussion by stating that the drafts for review
included notes and comments from the committee, Architectural Review Board (ARB), and staff. He then went
through the document, highlighting sections that he felt the committee would need to discuss further. Most
edits to this article were grammatical in nature or format related.
Mr. Singletary noted that having general language for sign regulations in the zoning ordinances benefits the
process so that the ARB does not have to review for compliance. He noted that different overlay districts could
have different regulations that the ARB would review as necessary.
The committee then discussed the purpose and intent, placement, general requirements for materials, internally
illuminated signs (LED standards to manage brightness – allow in certain districts and color temperature),
where signs should be located, sign shielding, height, and construction. They then discussed the sign chart in
Section 9.4. Discussion centered around types of signs and where they are in each zoning district. Other
discussions also included awnings, transparent window screens, pole mounted signs, and wall mounted signs.
The committee recessed at 3:56 and resumed the meeting at 4:01 p.m.
The committee continued to discuss directional signs, regulations for promotional signs, non-permanent signs
(construction signs, real estate signs, new home signs, etc.), special event signs, prohibited signs, and exempt
signs.
Unified Development Ordinance Committee June 15, 2023
Adjournment: Member Hudson moved to adjourn the meeting. Member Cannon seconded the motion.
Meeting was adjourned at 4:55 p.m.
UDO COMMITTEE APPROVED (Date):
Rae Davis, PC Chair
ATTEST:
Shannon Bowers, Town Clerk
TOWN OF CHAPIN
UNIFIED DEVELOPMENT ORDINANCE COMMITTEE
MEETING MINUTES
Thursday July 11, 2023 Town Hall
3:00 P.M.
Members Present: Planning Commission Members Caleb Pozsik, Clay Cannon
Members Absent: Yvonne Hudson, Rae Davis
Staff Present: Planning and Zoning Manager Kevin Singletary, Town Clerk Shannon Bowers, Town Administrator
Nicholle Burroughs (arrived at 4:45 p.m.)
Staff Absent: Town Administrator Nicholle Burroughs, Mayor Al Koon
Guests: Riccardo Giani - MRB Group (via Zoom)
Call to Order: Vice Chair Pozsik called the meeting to order at 3:10 p.m. and acknowledged the appropriate
notifications in compliance with the SC Freedom of Information Act had been met.
New Business
Draft Review – Article 3: Zoning Districts and Boundaries, Zoning Map: Mr. Singletary noted that the Unified
Zoning and Development (UDO) Committee had reviewed this article previously, but had not discussed as a committee.
The UDO Committee then discussed article 3, and most edits to this article were centered in section 3.7: District
Development Standards table. The UDO Committee discussed setback requirements for each zoning district and how
they relate to the SCDOT road widening projects. Mr. Gianni commented in the event there is a setback conflict, the table
allows for the Town to review for requirements that would be the most restrictive. Mr. Singletary noted that this could
spark conversations with SCDOT on encroachments for future projects. The committee discussed adding a provision in
the UDO to have setbacks not impede any future SCDOT projects. Mr. Gianni also commented that corridor buffers
could be a possible solution for setbacks for development. Mr. Singletary suggested having a discussion with SCDOT to
find a standard number to use when incorporating setback requirements before deciding which method to include in the
UDO.
The UDO Committee then discussed building height requirements in town center, rural, interstate commercial, corridor
commercial, office commercial, and light industrial. The Committee also discussed including a provision for flag pole
requirements.
Zoning Map
Mr. Singletary began the discussion of the zoning map by stating the guiding principle for this draft map is the
comprehensive plan. Once the UDO is complete, the comprehensive plan will be updated to reflect the zoning changes.
He noted the importance of the future land use map and the zoning map being compatible. The draft zoning map tries to
capture the transitions in zoning districts. The UDO Committee discussed these transitions and what those areas would be
most appropriately zoned as. The committee also discussed minimum lot sizes as they relate to new draft zoning
categories. Mr. Singletary and Mr. Gianni will work through specifics for minimum lot sizes/ lot coverage to determine
how these changes will affect future zoning.
Adjournment: Vice Chair Pozsik adjourned the meeting at 5:00 p.m.
UDO COMMITTEE APPROVED (Date):
Rae Davis, PC Chair
ATTEST:
Shannon Bowers, Town Clerk
3/30/23 MRB Draft
1
Article 5 Land Development Standards
5. Land Development Standards
5.1. Purpose
The public health, safety, economy, good order, appearance, convenience, morals, and
general welfare require the harmonious, orderly and progressive development of land
within the Town of Chapin. In furtherance of this general intent, the regulation of land
development by the Town of Chapin is adopted for the following purposes, among
others:
• To encourage the development of an economically sound and stable
community;
• To assure the timely provision of required streets, utilities, other facilities and
services to new land developments;
• To assure the adequate provision of safe and convenient traffic access and
circulation, both vehicular and pedestrian, in and through new land
developments;
• To assure the provision of needed public open spaces and building sites in new
land developments through the dedication or reservation of land for
recreational, educational, transportation and other public purposes; and
• To assure, in general, the wise and timely development of new areas or
redevelopment of areas in harmony with the adopted Town of Chapin
Comprehensive Plan.
5.2. Applicability
5.2.1. The following development shall comply with the improvement requirements in
this article:
5.2.1.1. All new, significantly improved, or expansion of development that
require Major Subdivision Review.
5.2.1.2. Major Certificate of Appropriateness
5.2.1.3. Developments that affect more than one entire block face
5.2.1.4. Nonresidential or multi-family development that is expanded more than
20% (Major COA?)
5.2.1.5. Manufactured Parks (See Conditional Use Standards)
5.2.1.6. Conservation Subdivisions (See Conditional Use Standards)
5.2.1.7. RV Parks (See Conditional Use Standards)
5.2.1.8. Expansion, renovation, or redevelopment Nonconforming structures
and sites (Section 11.6)
5.2.1.9. Other developments as determined by the Zoning Administrator that
are not exempted in Section (Minor Subdivision/Minor COA -
Applicability)
5.2.2. The applicant shall be responsible for the installation and construction of
required improvements according to the provisions of this ordinance, except as
may otherwise be specifically provided herein or by Town policy or agreement.
5.2.3. Approval of a Subdivision Plat (Major) and certificate of zoning compliance shall
be subject to the applicant having installed the improvements designated in this
3/30/23 MRB Draft
2
article, or having guaranteed (Improvements guarantee), to the satisfaction of
the Town, the installation of said improvement
5.3. Table of Required Improvements
Required
Improvements
Section RR RA SR1 SR2 SR3 TR1 TR2 TR3 VC TC PI CC IC OC LI
Public Water and
Hydrants
5.3.2.2 □ □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Public Sewer 5.3.2.2 □ □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Paved Streets □ □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Underground
Drainage
□ □ □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Curb and Gutter ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Sidewalks ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Street Trees □ □ □ □ □ ■ ■ ■ ■ □ □ □
Street Signs ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Underground Utilities □ □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Community Green or
Open Space
□ □ ■ ■ ■ □ □ ■ □ □ ■ ■
■ Required improvements by district □ may be required at the discretion of the administrator based on
existing conditions, surrounding context
5.3.1. General Requirements
5.3.1.1. Street Improvements: Land designated for public or private streets shall
be cleared and filled in accordance with the latest edition of the “South
Carolina Standard Specifications for Highway Construction”, South
Carolina State Highway Department, or as determined appropriate by
the Town Engineer or Administrator.
5.3.1.2. Water and Sewer Facilities: Water and sewer facilities shall be provided
in accordance with the standard procedures and policies of the Town
Engineer, the Department of Health and Environmental Control (DHEC)
and by the water and sewer provider, if different from above.
5.3.1.3. Utility Lines: All utility lines within a development site shall be installed
underground, unless there are existing above-ground lines that serve
the property. When it is found to be necessary and desirable to locate
public utility lines in other than street right-of-way, easements shall be
shown on the plat for such purposes. When the water main is located
in the street right-of-way and it will be necessary to cut into the street
surface to serve abutting lots, a connection shall be stubbed out to the
property line to serve each lot before the street is surfaced. When it is
found to be necessary and desirable to locate public utility lines in other
than street right-of-way, easements shall be shown on the plat for such
3/30/23 MRB Draft
3
purposes. Such easements shall be not less than twenty (20) feet along
rear property lines and ten (10) feet alongside property line and, where
possible, shall be centered on rear and side lot lines.
5.3.1.4. Natural Gas: When gas lines are located in a street right-of-way, where
possible, such lines shall be located outside the portion of the street to
be surfaced to prevent cutting into the paved surface to serve abutting
properties.
5.3.1.5. Improvement of Existing Substandard Conditions: Where the existing
right of way is substandard, the developer shall be required to dedicate
the appropriate amount of right-of-way (as measured from the
centerline of the existing street) as well as install all noted sidewalk
zone improvements including expanded sidewalks and street trees,
lighting, storm drain improvements and street furniture as a part of the
development process. Requests for waivers based on practical
hardships shall be made to the Planning Commission. Appeals to this
decision shall follow the process outlined in Section 10.7.1.4
5.3.1.6. Flood Hazard Areas: In accordance with the Town’s Flood Prevention
Ordinance, any development that contains land subject to flooding shall
be accompanied by evidence that no appreciable expansion of the area
subject to flooding would result from the proposed development of the
land being subdivided, and that the proposed development will be
adequately protected from inundation without appreciable interference
with the flow of any watercourse or into an impounding basin. In no
case shall any fill, levee, or other protective works be approved unless
sufficient compensating adjustments of waterways, ditches, or
impounding basins are made to prevent any appreciable expansion of
flood hazard area.
5.3.1.7. Storm Drainage: An adequate drainage system, including necessary
improved open channels, pipes, culverts, storm sewers, intersection
drains, drop inlet, bridges, and other necessary appurtenances shall be
installed by the subdivider and shall be according to plans and
specifications approved by the Town Engineer. In cases where a
drainage or water course easement is needed, such public easement
shall be not less than twelve (12) feet in width.
5.3.2. Surveying and Engineering
5.3.2.1. Installation of Permanent Reference Points: Permanent reference points
shall be placed in accordance with the following requirements:
5.3.2.1.1. General Standards: Boundary surveys shall be performed, in
accordance with the state minimum standards published by
the State Board of Registration for Professional Engineers and
Land Surveyors, unless more stringent requirements are
specified. A minimum of two points in any survey must be tied
to the state plane coordinate system. The survey may be done
3/30/23 MRB Draft
4
on the horizontal ground distance and tied back to the state
plane coordinates.
5.3.2.1.2. Control Monuments: Vertical control monuments shall be
placed in or near the centerline of pavement of subdivision
streets at a minimum of 1 per 4 acres. Where practical,
control monuments shall be placed at points of curvature and
points of tangency of curves. The control monument may be
poured on the job or be a concrete marker of the type
commonly used in the area: at least 3 feet long and tapered
with a 12-inch long, 1/4-inch diameter brass or bronze rod
embedded in the top. Control monuments shall be placed in a
cast iron water main valve type box with a cover flush with
the pavement.
5.3.2.1.3. Property Marker: A steel or wrought iron pipe, rebar, or the
equivalent, not less than 0.5 inches in diameter and at least
24 inches in length shall be set at all property corners and
points of curves, except those located by monuments. They
shall be flush with the ground.
5.3.2.1.4. Accuracy: Land surveys within the Town limits shall be Class A
surveys, set at an accuracy of at least 1:10000.
5.3.3. Improvement Guarantees
5.3.3.1. Types Allowed: Prior to approval of a Final Subdivision Plat (FINAL PLAT),
the applicant shall provide a performance guarantee to ensure the
completion of required improvements within a period of time as agreed
upon by the Planning Commission or Town Engineer and the applicant,
and expressed in the guarantee. Such guarantee may be in the form of a
performance bond, a surety bond, a cash deposit, or a letter of credit. A
performance guarantee shall be posted in the amount of 125% of the
total cost of improvements, or in an amount otherwise approved by the
Planning Commission or Town Engineer.
5.3.3.1.1. Performance / Surety Bonds and Letters of Credit: The
performance or surety bond, or letter of credit, shall be in a
form acceptable to the Town. It shall include a pledge by the
bank, insurance company or other bonding/lending institution
that the funds necessary to carry out the terms of the
agreement are guaranteed for payment, and will be released
only upon receipt of written instruction from the Town.
5.3.3.1.2. Cash Deposits: If surety is in the form of a cash deposit with
the Town of Chapin, proportional parts thereof shall be
refundable in relation to progress payments less retainage,
subject to approval of the Town and subject to a minimum
deposit balance of 25% of the project cost.
5.3.3.1.3. Maintenance Guarantees: If the applicant completes all
required improvements and complies with all conditions of
3/30/23 MRB Draft
5
the subdivision agreement as determined by the Town, the
remainder of monies retained by a financial institution or by
the Town may be released to the applicant or his successor in
title. Prior to release, the applicant shall provide the Town,
prior to the issuance of any building permit, a performance
bond, a surety bond, or a cash deposit equal to the amount
determined by the Town that would ensure the repair of any
damage to the existing improvements during the course of
any construction, but in no case will the amount of the
security be less than $1,000 for each individual building lot.
Prior to the issuance of any certificate of occupancy, the Town
shall determine whether or not any breakage or damage has
occurred. If no damage to any off-site improvements has
occurred, then the Town may release the security to the
applicant or his successor in title. If damages have occurred,
they shall be repaired, or the Town may draw on the security
before it is released.
5.3.4. Street Layout Standards
5.3.4.1. General Standards: All streets, which shall hereafter be established in
connection with the development of a subdivision, shall comply with
the following design standards:
5.3.4.1.1. The layout of the streets as to arrangement, character,
width, grade, and location may be required to conform to the
Town’s Master Plan, Official Map, Comprehensive Plan,
5.3.4.1.2. Connectivity between compatible uses and adjoining
street systems to reduce curb cuts on major thoroughfares and
encourage local traffic to use alternative routes on minor
streets.
5.3.4.1.3. Where a subdivision abuts or contains an existing or
proposed collector or through street, the Planning Commission
may require marginal access streets, reverse frontage with
screen planting, deep lots, or such other treatment as may be
necessary for adequate protection of residential properties and
to afford separation of through and local traffic.
5.3.4.1.4. Roads of an existing subdivision shall not be used as the
sole means of ingress and egress in developing a new
subdivision or extending an existing one unless granted by the
Planning Commission. If, in judgement of the Planning
Commission, the increased traffic and noise would create a
safety hazard or otherwise be detrimental to residents of the
existing subdivision, additional access shall be provided.
3/30/23 MRB Draft
6
5.3.4.2. Continuation of Existing Street Pattern
Whenever topography will permit, the arrangements of streets in a
subdivision shall provide for the alignment and continuation or
projection of existing streets in adjoining areas. This is to mean the
interconnectivity of subdivision developments.
5.3.4.3. Block Sizes
The Planning Commission shall examine every proposed subdivision as
to its compliance with the following provisions:
5.3.4.3.1. Nonresidential Blocks: Non-residential blocks shall be of such
length and width as may be suitable for their prospective use,
including adequate provision for off-street parking and
service.
5.3.4.3.2. Residential Blocks: the length of residential blocks hereafter
shall not exceed fourteen hundred (1400) feet or be less than
six hundred (600) feet from corner to corner. Provided,
however, such length requirements may be modified when
such shall be appropriate due to the topography or physical
shape of the property being subdivided. The width of any
residential block shall be sufficient to permit two (2) tiers of
lots, where topography and land ownership permits, except
as otherwise provided in these regulations.
5.3.4.3.3. Crosswalks: When any type of block exceeds seven hundred
(700) feet, crosswalks for pedestrians shall be required. Such
right-of-way shall not be less than ten (10) feet wide and
improved to include a concrete, asphalt or other approved
surface sidewalk six (6) feet wide and four (4) inches thick.
5.3.4.4. Connectivity to Adjacent Properties
New developments shall if practicable, connect to any existing street
stubs from adjacent properties and stub to all adjacent properties.
Street stubs shall continue the existing street pattern if applicable.
5.3.4.4.1. Exemptions: Street stubs shall not be required where the
conditions listed below would prevent connections:
5.3.4.4.1.1. Topographical conditions (pre-development
slopes of 18% or greater)
5.3.4.4.1.2. Environmental conditions (marshes, floodplains,
etc.)
5.3.4.4.1.3. Property shape
5.3.4.4.1.4. Property accessibility (existing platted subdivision
with no stubs)
5.3.4.4.1.5. Incompatible adjacent land uses
3/30/23 MRB Draft
7
5.3.4.4.2. Location: Where multiple connection opportunities exist,
street stub connections shall be prioritized in the site design
as follows:
5.3.4.4.2.1. Adjacent parcels 20 acres or greater in size.
5.3.4.4.2.2. Adjacent parcels that abut or are traversed by
existing or proposed streets.
5.3.4.4.2.3. To minimize overall access points along an arterial
or collector street.
*Source: Summerville, SC Unified Development Code.
5.3.4.4.3. Design: Stub streets and streets intended for extension
during future phases shall be constructed to extend to the
property line or as close to the line as practical. It shall be the
responsibility of the second development to construct the
connection to an existing stub street. Stub streets shall not
exceed 150 feet in length without a paved turnaround
(permanent or temporary)
5.3.4.4.4. Adjacent Parking Areas: Where most feasible, parking areas
that are adjacent to each other shall be connected to limit
curb cuts and access points along the public right-of-way. This
connection shall have a maximum width of 24’, with two 12’
wide travel lanes.
3/30/23 MRB Draft
8
5.3.4.5. Cul-de-sacs and Dead-End Streets
Dead end Streets and Cul-de-sacs are not permitted, unless approved by
the Planning Commission. If a dead-end street or cul-de-sac is
constructed, it shall be subject to the following:
5.3.4.5.1. Permanent dead-end streets shall be no longer than 300 feet
and shall be provided with a turnaround such as a cul-de-sac.
5.3.4.5.2. Temporary dead-end streets shall be provided with a
temporary turnaround area which shall be designed
considering traffic usage, maintenance, and removal.
5.3.4.5.3. Half streets are prohibited along property lines, entire street
right0ofways shall be platted within the proposed subdivision.
5.3.5. Street Design Standards
5.3.5.1. General
When a subdivision creates new streets, they shall be subject to the
street design standards of this section. The Planning Commission shall
approve the street design during the review of the preliminary plat in
the Subdivision process (Article 10.X). The following are general
standards for the design of roadways:
5.3.5.1.1. SCDOT Standards: Intersection sight distance on major
thoroughfares shall be determined by the State Highway
Department. Grades on major thoroughfares shall be
established by the State Highway Department. On major
thoroughfares, the centerline radius of a curvature shall be
determined by the State Highway Department. Any conflicts
or contradictions, administrator to use ARMS Manual by
SCDOT, defer to Town Engineer, or authorized representative
from SCDOT.
5.3.5.1.2. Traffic Control devices: whether signs or signals, shall be
installed by the Developer as deemed appropriate by the
Town of Chapin, its agencies and/or the South Carolina
Department of Highways and Public Transportation. The
authority to require traffic control devices may be exercised
by the Town at any time during the approval process.
5.3.5.1.3. Street Jogs: Street jogs should be avoided. Where
unavoidable, the Planning Commission may permit a street
jog at intersections shall have a centerline offset of not less
than one hundred fifty (150) feet.
5.3.5.1.4. Naming of Streets: Streets that are extensions of, or obviously
in alignment with existing named streets, shall bear that
name. The name of new streets shall be subject to the
approval of the Town Planning Commission and shall not
duplicate or be similar in sound to existing names in Lexington
County, irrespective of the use of the suffix street, avenue,
3/30/23 MRB Draft
9
circle, way, boulevard, drive, place, or court or the like. Street
name signs shall be installed at all intersections within a
subdivision. The location and design of such signs shall be
approved by the proper town authority.
5.3.5.1.5. Split Level Streets: Streets which are constructed so as to have
two traffic ways, each at different levels within the same
right-of-way, shall provide a paved traffic surface of at least
twenty (20) feet on each level and a slope between the two
traffic ways of three to one (3:1) or flatter
5.3.5.1.6. Nonconforming Right-of-ways: Subdivisions which include an
existing platted street that does not conform to the minimum
right of way requirements of these regulations shall provide
additional width along one or both sides of such street so that
the minimum right of way required by these regulations is
established. Subdivisions abutting only one side of such street
shall provide a minimum of one half, measured from the
centerline of the existing right of way, of the right of way
required by these regulations.
5.3.5.2. Street Sections
During review of the sketch plan/preliminary Plat, the applicant shall
identify all proposed streets and existing street classifications on the
site plan. The applicant will be required to install all improvements
within the development site. The Town of Chapin recognizes three
primary minimum right of way and pavement widths, as described in
the table below:
Street
Classifications
Right-Of-
Way
(Min/Max)**
Travel Lane
Width
(Min/Max)
On-street
parking*
Planting
Strip
Sidewalk
1. Arterial 80’/92’ 50’ N/A 6’ 6’
2. Collector 66/78’ 28’ N/A 6’ 5’
3. Local Minor 50’/60’ 28’ Optional 4’ 5’
4. Downtown 50’/60’ 24’ Required 4’ 5’
*All parking spaces shall comply with parking space dimensions in Parking Section.
**Right-of-way widths shall not be in conflict with SCDOT standards
3/30/23 MRB Draft
10
*Example Street Section, Source: City of Buffalo, NY - Unified Development Ordinance
5.3.5.2.1. Minor Street Additional Standards: In addition to the above
table, minor streets must comply to the following:
5.3.5.2.1.1. Street Grades: Grades on minor residential
streets shall not exceed fifteen (15%) percent.
5.3.5.2.1.2. Horizontal Curves: Where a deflection angle of
more than ten (10) degrees occurs in the
alignment of a minor street, a curve of reasonable
radius shall be introduced. The centerline radius
of a curvature shall not be less than one hundred
and fifty (150) feet
5.3.5.2.1.3. Intersection Sight Distance: Shall be one hundred
and sixty (160) feet (25 mph)
5.3.5.2.2. Collector Street Additional Standards: In addition to the
above table, collector streets must comply to the following:
5.3.5.2.2.1. Street Grades: Grades on collector streets shall
not exceed eight (8%) percent unless topographic
conditions make this impractical.
5.3.5.2.2.2. Horizontal Curves: A curve shall be introduced at
any change in direction of a Collector Street or
major thoroughfare. The centerline radius of
curvature shall not be less than three hundred
and fifty (350) feet.
5.3.5.2.2.3. Intersection Sight Distance: Shall be two hundred
and seventy-five (275) feet (40 mph).
5.3.5.2.3. Arterial Street Additional Standards: In addition to the above
table, minor streets must comply to the following:
5.3.5.2.3.1. Street Grades: Grades on major thoroughfares
shall be established by the State Highway
Department.
3/30/23 MRB Draft
11
5.3.5.2.3.2. Horizontal Curves: On major thoroughfares, the
centerline radius of a curvature shall be
determined by the State Highway Department.
5.3.5.2.3.3. Intersection Sight Distance: Shall be determined
by the State Highway Department
5.3.5.3. Intersections
The centerline of no more than two (2) streets shall intersect at any one
point. Streets shall be laid out so as to intersect as nearly as possible at
right angles and no street shall intersect any other street at an angle of
less than sixty (60) degrees (angles of intersection to be measured at
the intersection of street centerline). Curved streets shall have a
minimum tangent of one hundred (100) feet at intersections.
5.3.5.4. Sidewalks
5.3.5.4.1. General Standards: Sidewalks shall be installed and shall be
constructed to the specifications of Section 5.6.3.2. Sidewalks
shall be constructed within the street right-of-way, and
approved by the Town Engineer. Sidewalks shall be a
minimum of 5 feet wide unless otherwise noted.
5.3.5.4.2. Timing of Sidewalk Construction: All sidewalks must be
constructed before each house or structure receives a final
Certificate of Occupancy or, if the street is already
constructed, prior to acceptance of any improvements. This
does not apply to pedestrian paths or trails that will be
provided outside of the normal right-of-way.
5.3.5.4.3. Existing Sidewalks: Where existing sidewalk abuts an area
where new sidewalk is to be developed, the new sidewalk
shall be the same width as the existing sidewalk or meet the
standards in Section 5.6.3.2.
5.3.5.4.4. Commercial and Multi-Family Developments: Within
commercial areas and places with high pedestrian volumes,
sidewalks should be designed to meet the anticipated
pedestrian/traffic volume as well as accommodate outdoor
seating. Multi-family and planned developments shall provide
sidewalks for interior movement of pedestrians and for
interior to connect to public sidewalk system.
5.3.5.5. Street Tree Planting Requirements
5.3.5.5.1. Planting Areas: Planting strips in accordance with cross
sections in Section 5.6.3.2.
5.3.5.5.2. Location and Number: Street trees should be planted at forty
(40) foot intervals within five (5) feet of the street
right-of-way on both sides of the street, but must be outside
3/30/23 MRB Draft
12
the right-of-way. Street trees shall be installed within the
planting strip between the sidewalk and the curb of a street.
5.3.5.5.3. Applicable to TC and VC: Street trees may be installed within
tree wells, and shall be installed to replicate existing spacing
patterns of street trees. The Administrator shall determine
the appropriate spacing of street trees.
5.3.5.5.4. Tree Species: The Town should have a diverse species of
street trees to avoid mass disease. Additionally, street trees
species shall be appropriate for the climate and soil, and be of
a drought tolerant species.
5.3.5.5.5. Minimum Tree Size: At the time of planting, small maturing
trees should be 2.5-inch caliper, with the lower side of the
crown a minimum of 6 feet above grade to avoid hazards to
pedestrians.
5.3.5.5.6. Tree Wells: Tree size and longevity is directly related to soil
volume and quality; projects where tree wells are utilized will
be evaluated on an individual basis to determine the ideal size
of the tree well for the application and context in an attempt
to maximize volume. Where possible with new construction, a
continuous trench of soil (even underneath hardscape) should
be provided for root growth.
5.3.5.6. Street Lighting
5.3.5.6.1. General Standards: It is the intent of the town to have streets
be well lit for cars most importantly for the safety and
comfort of pedestrians. Lighting shall be placed such that it is
well coordinated with the expected canopy of street trees.
Standard 15,000 lumen H.P.S street lights shall be installed,
and appropriately shielded to prevent light spillover to
adjacent properties. The Town of Chapin will require street
lights to be installed at a minimum ratio of one light for every
six units in public developments. Lighting plans shall be
submitted and approved prior to installation.
5.3.5.6.2. Maintenance and Ownership: The developer shall be
responsible for the operating cost of said lights at the
standard rate subject to the rate and class of service approved
by the South Carolina Public Service Commission until the
Town accepts title to the effected subdivisions road
infrastructure, at which time the Town will assume
responsibility for said operating costs. If the developer elects
to install more than one street light per six (6) lots, then the
operating costs for all such additional street lights shall be
borne by the developer or the residents of the effected
subdivision.
5.3.5.7. Exceptions
3/30/23 MRB Draft
13
5.3.5.7.1. The Town recognizes that the required street sections and
streetscape may not always be constructed as prescribed in
this article. Reasonable relief may be granted by the Planning
Commission if the connection to an existing right-of-way or
construction of a new right-of-way encounters any of the
following constraints:
5.3.5.7.1.1. Insufficient existing street right-of-way
5.3.5.7.1.2. Topographic features
5.3.5.7.1.3. Conflict with SCDOT or County road project
5.3.5.7.1.4. Legal constraints
5.3.6. Street Access Standards
5.3.6.1. Applicability: Any development that requires an access point (rear
alley/lane or driveway) for purposes of ingress and/or egress shall be
subject to the provisions of this section. All new accesses must be
approved by the appropriate permitting authority. The Town
encourages developments that limit or combine access points to
prevent high concentrations of access points along main roads.
5.3.6.2. Maximum Number: For single-family and two- and three-family
dwellings, only one driveway shall be permitted per lot. In Suburban
Residential Districts, circular driveways may be permitted on lots
greater than 100 feet in width. The maximum width for driveways in
residential areas is 16’. Commercial driveways may have two lanes,
ingress and egress, each 12’ in width, unless otherwise required by
SCDOT. For double frontage lots, one curb cut per street may be
permitted. For all other building types, the maximum number of
driveways allowed for any property is outlined in the table below:
Table 5.3.6.2
Frontage Width Maximum Permitted Driveways per Street Frontage
Up to 150 feet 1 driveway
150 feet or more 2 driveways
5.3.6.3. Locations and Spacing
5.3.6.3.1. Street Intersections: No curb or other access point shall
be located closer than 20 feet from the intersecting point of the
2 street right-of-way property lines involved. No curb or other
access point shall be closer than 25 feet from the intersection of
the 2 curb lines involved.
5.3.6.3.2. Spacing: All access points shall have a minimum
separation from certain features as follows:
Table 5.3.6.3.2 Access Point Locations and Spacing
Feature Minimum Separation
Adjacent Property Line (except shared driveways) 5ft
Another curb cut on local minor 25ft*
3/30/23 MRB Draft
14
Less than 35 mph 200ft*
40 mph 250ft*
45 mph 300ft*
50 mph 400ft*
55+ mph 500ft*
*As measured from centerline of the driveway or street
5.4. Open Space
5.4.1. General Standards
The Planning Commission shall require that open space be reserved for active or
passive recreation where such reservations would be appropriate. Each
reservation shall be of suitable size, dimension, topography and general access
for the particular purposes envisioned by the Planning Commission. These areas
shall be shown on the Plat and marked “reserved for recreation open space”.
To insure the orderly development of the community, the subdivider shall be
required to reserve and negotiate to sell needed spaces for parks, schools, fire
stations and playgrounds, as required by local governmental units, for a period
not to exceed thirty (30) days from the date of submission of the Sketch Plan.
The reservation period may be extended for one (1) additional thirty (30) day
period if a governmental unit files with the Planning Commission a written
statement indicating a desire to negotiate.
5.4.2. Amount of Open Space Required
Development subject to these standards shall provide open space set-asides in
an amount that meets or exceeds the minimum area in Table 5.4.2.1: Required
Open Space, based on the use and the zoning district where the development is
proposed. If there is a conflict with the requirements herein, this article shall
govern.
5.4.2.1. Required Open Space
Table 5.4.2.1: Required Open Space
Minimum Open Space Area (% of Development Site Area)
Size of Development* Less than 10 acres 10-15 acres Greater than 15
acres
District
Agricultural (RA or RR) 50% 50% 50%
Suburban Residential (SR1,
SR2, & SR3)
20% 20% 25%
Town Residential 1-2 (TR1
and TR2)
10% 10% 15%
Town Residential 3 (TR3) 10% 20% 25%
Village Commercial (VC) Exempt Exempt Exempt
Town Center (TC) Exempt Exempt Exempt
Commercial (CC, IC, OC) Exempt Exempt Exempt
3/30/23 MRB Draft
15
Public or Institutional (PI) 5% 5% 5%
Industrial (LI) Exempt Exempt Exempt
*This shall include the total area of a development, including future phases
5.4.2.2. Specific Requirements for Major Subdivisions
5.4.2.2.1. Amenity Centers: It is the intent of this section to provide
residents of subdivision with quality amenities that add to the
livability and quality of life. Depending on how many lots are
within a residential subdivision, an amenity center shall be
required. The amount of area allocated to open space shall
comply with the percentages in Table 5.3.2.1. The Town
classifies three types of amenity centers, the requirements for
each and their applicability requirements are as follows:
5.4.2.2.1.1. Basic Amenity Center
5.4.2.2.1.1.1.Number of Lots: 50 to 84
5.4.2.2.1.1.2.Open Space Type: Each
development shall include a
walking trail (pervious or
impervious), or connection to
existing trail. A covered picnic
area with a minimum of 2 tables.
5.4.2.2.1.2. Standards Amenity Center
5.4.2.2.1.2.1.Number of Lots: 85 to 149
5.4.2.2.1.2.2.Open Space Type: A play area
within a park setting, including
swings, jungle gym, or other
similar feature as determined by
Planning Commission during
preliminary plat review. Shall have
an improved trail within the
development and connect to
adjacent trails if applicable.
5.4.2.2.1.2.3.Recreation Facility: One type of
sport court or field is required.
Examples include basketball or
tennis court, disc golf course,
volley ball court.
5.4.2.2.1.2.4.Gated Boat Storage: If the
development has water access, the
structure or area dedicated to boat
storage shall have sufficient
landscaping around the perimeter
of the gated area, to be
3/30/23 MRB Draft
16
determined by the Planning
Commission. Additionally, this
area shall have a Type B buffer, as
described in Section 7.3.2 when
adjacent to a residential lot.
5.4.2.2.1.3. Enhanced Amenity Center
5.4.2.2.1.3.1.Number of lots: 150 or more
5.4.2.2.1.3.2.Open Space Type: A play area
within a park setting, including
swings, jungle gym, or other
similar feature as determined by
Planning Commission during
preliminary plat review. Shall have
an improved trail within the
development and connect to
adjacent trails if applicable.
5.4.2.2.1.3.3.Recreation Facility: One type of
sport court or field is required.
Examples include basketball or
tennis court, disc golf course,
volleyball court.
5.4.2.2.1.3.4.Clubhouse: Minimum of 1600
square feet, including an indoor
gym, and bathrooms.
5.4.2.2.1.3.5.Swimming Pool: Minimum of 1800
square feet. Perimeter of the pool
area shall be landscaped and
included in the overall landscape
plan.
5.4.2.2.1.4. Exceptions
5.4.2.2.1.4.1.Additional or Non-Listed
Amenities: Other types of
amenities may be submitted to the
planning commission for
consideration to replace one of the
required amenities listed above.
Any open space types in Table
5.4.3.1 may be substituted for a
similar feature within this section
if approved by the Planning
Commission.
5.4.2.2.1.4.2.Conflicts: Any conflicts with other
regulations within this ordinance
shall be resolved by the Planning
3/30/23 MRB Draft
17
Commission. If there are conflicts
with existing topographical
features, utilities, easements, or
other type of hardship, a variance
to these requirements may be
submitted. Variances to these
provisions shall have a
recommendation by the Planning
Commission first prior to the
hearing by the Zoning Board of
Appeals.
5.4.3. Areas Counted Toward Open Space Requirement
5.4.3.1. The features and areas identified as counting toward open space shall
be credited towards compliance with the amount of open space
required in accordance with Section 5.4.2.1 above.
Table 5.4.3.1: Open Space Features
Open Space Type Description
Parks A large public green area in a town,
used for recreation or gatherings.
Plaza An open space that may be
improved, landscaped, or paved,
usually surrounded by buildings or
streets.
Square Open space that may encompass an
entire block, is located at the
intersection of important streets,
and is set aside for civic purposes,
with landscaping consisting of paved
walks, lawns, trees, and civic
buildings
Playground A land use designed principally to
offer recreation, passive or active, to
the public
Community Garden A private or public facility for
cultivation of fruits, flowers,
vegetables, or ornamental plants by
the surrounding community.
Pedestrian Passageway A publicly accessible path that
navigates between buildings or
developments to encourage
pedestrian movement.
Greenway A linear park, alternative
transportation route, or open space
conservation area approved by the
[local commission] that provides
passive recreational opportunities,
3/30/23 MRB Draft
18
pedestrian and/or bicycle paths,
and/or the conservation of open
spaces or natural areas
Trail, or Trail Connection A way designed for and used by
equestrians, pedestrians, and cyclists
using nonmotorized bicycles,
sometimes a part of a local or
regional system.
5.4.3.2. The following areas shall not be counted as open space set-aside areas:
5.4.3.2.1. Private yards not subject to an open space or conservation
easement;
5.4.3.2.2. Street rights-of-way or private access easements, including
sidewalks located within those rights-of-way or easements,
5.4.3.2.3. Open parking areas and driveways including parking lot
landscaping;
5.4.3.2.4. Land covered by structures, unless accessory to open space
features of Table 5.4.3.1;
5.4.3.2.5. Outdoor storage areas; and,
5.4.3.2.6. Stormwater ponds not located and designed as a site amenity
(e.g., with low fencing, trails, vegetative landscaping, gentle
slopes, fountain or other visible water circulation device, and
pedestrian access or seating).
5.4.4. Location
Open space shall be located to be easily accessible and useable by occupants
and users of the development. Where possible, a portion of the open space
should provide focal points for the development through prominent placement
or easy visual access from streets.
5.4.5. Configuration
5.4.5.1. Open space shall be compact and contiguous unless a different
configuration is needed to continue an existing trail or accommodate
preservation of natural features.
5.4.5.2. If the development site is adjacent to existing or planned public trails,
parks, or other public open space area, consideration should be given to
adjoining, extending, and enlarging the trail, park, or other public open
space area.
5.4.6. Ownership and Management
5.4.6.1. All open space areas shall include deed restrictions, covenants, or other
legal instruments that ensure continued use of the land for its intended
open space purposes, in perpetuity, and provide for the continued and
effective management, operation, and maintenance of the land and
facilities.
5.4.6.2. Responsibility for managing and maintaining open space rests with the
owner of the land. Failure to maintain open space in accordance with
3/30/23 MRB Draft
19
this Section and the development approval shall be a violation of this
Ordinance.
5.4.7. Exemptions
The following development is exempted from the standards in this Section:
5.4.7.1. Residential development that creates fewer than 10 dwelling units;
5.4.7.2. Utility Uses;
5.4.7.3. Agricultural Uses; and
5.4.7.4. Industrial Uses
5.5. Alternative Development Patterns
5.5.1. Purpose: The alternative development options of this section allow for variety
in development standards while maintaining the overall character of a
neighborhood. These options have several public benefits:
• They allow for development that is more sensitive to the environment,
especially in areas;
• They allow for the preservation of open and natural areas;
• They promote better site layout and opportunities for private recreational
areas;
• They promote opportunities for workforce housing by allowing for a mixture
of lot and building sizes, and
• They promote energy-efficient development.
5.5.2. Applicability: The developer or applicant desiring to use these alternative
development patterns within this section shall comply with the Major
Subdivision application requirements.
5.5.3. Conflict With Other Regulations: If there is a conflict between the requirements
for alternative development patterns and any other requirement of this
Ordinance, the standards of this section take precedence, otherwise these
alternative development patterns are subject to all other applicable
requirements of this Ordinance.
5.5.4. Conservation Subdivision
5.5.4.1. Purpose: The use of conservation subdivision design seeks to optimize
land use in and around the Town of Chapin, while maintaining a balance
between the preservation of agriculturally, environmentally and
historically significant areas and allowing reasonable and sustainable
growth to continue in the Town. New development shall avoid
disturbance of areas or elements defined as “sensitive” or “significant”.
The use of conservation subdivision design shall not be required, but is
encouraged for use on residential subdivisions/The use of conservation
subdivision design may be required of all residential subdivisions:
5.5.4.1.1. Of less than 20 lots;
3/30/23 MRB Draft
20
5.5.4.1.2. Of less than 15 acres;
5.5.4.1.3. Not located in certain identified areas of conservation
(sensitive area overlay zones/districts);
5.5.4.1.4. With less than fifty percent (50%) of the parcel identified as
agriculturally, environmentally or historically significant.
5.5.4.2. Application: The developer/applicant shall supply a completed
subdivision application (Article 10, major subdivision) to the Town of
Chapin Department of Building and Zoning which includes a draft of the
conservation easement for the portion of the property that will remain
as permanent open space or agricultural land and a fully dimensioned
site plan, drawn to scale, which shall demonstrate, delineate, and label
all of the following:
5.5.4.2.1. Topography, including areas to be graded, earth movements,
drainage provisions, existing contour lines and any proposed
new contour lines and any other significant topographical
features.
5.5.4.2.2. The location and type of sensitive areas deemed to be of
agricultural, environmental, or historical significance, as
defined in APPENDIX DEFINITIONS of this ordinance. All
construction contracts shall include language protecting
sensitive areas, agricultural land, areas of conservation, and
areas containing sensitive elements.
5.5.4.2.3. The location and type of all proposed areas to be preserved as
open space or agricultural land, including areas of mitigation
and preservation. These areas shall be marked for
identification upon site inspection.
5.5.4.2.4. Existing zoning, land use(s), and approximate density of
residential uses.
5.5.4.2.5. Septic or waste water provisions as provided by SCDHEC.
5.5.4.2.6. For areas of agricultural preservation, a buffer strip of at least
seventy-five (75) feet must be delineated. When possible,
existing woodlands should be used, if not, a variety of rapidly
growing indigenous trees and shrubs should be planted thickly
in the buffer strip.
5.5.4.2.7. Any other provisions not specifically required or excluded
herein, as required by this Ordinance.
5.5.4.3. Density: The density allowed by the parcel’s zoning unless a density
bonus is awarded to the developer by the Town of Chapin Planning
Commission.
5.5.4.3.1. Density Bonuses: Density bonuses may be awarded to
developers who dedicate land for public use, such as trails
and parks. Additionally, density bonuses may be awarded for
the provision of affordable or workforce housing for low to
moderate income families.
3/30/23 MRB Draft
21
5.5.4.4. Open Space Requirements: A minimum of fifty percent (50%) of the
parcel must be designated as permanent open space.
5.5.4.4.1. Ownership of Open Space: Shall be protected by a
conservation easement held by the homeowners association,
local conservation commission, land trust, or Town of Chapin
that is recorded in the office of the County Registrar of Deeds.
The owners of the open space are responsible for the
payment of any taxes, upkeep, insurance, and any other
responsibilities associated with “ownership” of the land
5.5.4.4.2. Usable Open Space: At least half of the required open space
shall be useable for agricultural or recreational purposes.
5.5.4.5. Final Plat Requirements
5.5.4.5.1. In addition to the final plat requirements conditioned by
subdivision approval by the Planning Commission, and
requirements in Article 10. Included with the final plat, the
subdivider shall submit a subdivder’s agreement regarding the
liability for and maintenance of the open space. In addition,
the subdivider must include a conservation easement/open
space covenant protecting the open space from any further
development.
5.5.4.6. Appeals
5.5.4.6.1. Any appeals to the decision regarding this section shall follow
the appeal process outlined for subdivision applications
(Article 10).
Manufactured Home Park
Compliance with all other regulations: Compliant with conditional standards in Article 4
5.5.5. Group Development
5.5.5.1. Purpose and Intent
In order to prevent creation of traffic hazards, insure the provision of
off-street parking and provision of necessary utilities, plans for group
developments such as shopping centers, industrial parks, mobile home
parks, apartment complexes, and motels where the site is not
subdivided into lots and public streets, but is retained in one ownership,
the site plan shall be submitted to the Planning commission for review
and approval. These regulations are considered minimum and may be
superseded by more restrictive regulations such as the zoning
ordinance.
3/30/23 MRB Draft
22
5.5.5.2. Types of Group Developments
5.5.5.2.1. Group commercial or industrial developments consist of more
than one commercial or industrial structure erected on a
single lot.
5.5.5.2.2. Group housing developments consist of Any structure
containing more than four dwelling units on the first-floor
level thereof or containing more than eight dwelling units
throughout, except that high rise apartments are not
considered to be group housing developments. Or More than
one structure containing dwelling units erected on a single lot.
5.5.5.3. Application Process: The developer/applicant shall supply a completed
subdivision application (Article 10, major subdivision) to the Town of
Chapin. In addition, the following shall be required, unless otherwise
determined by the administrator:
5.5.5.3.1. Site Analysis consistent Section 10.3.1.1
5.5.5.3.2. Site Plan consistent with all relevant information detailed in
Section 10.3.1.3
5.5.5.3.3. Traffic Impact Study consistent with the requirements of
Section 5.6
5.5.5.3.4. Construction Documents consistent with Section 10.3.1.4.
5.5.5.4. General Standards for Group Developments: In addition to other
requirements within this Section, the applicant shall demonstrate
compliance with the following:
5.5.5.4.1. Conformance with Ordinance: The submitted applications
shall be compliance with standards and requirements for
parking, signage, setbacks, spacing between buildings,
residential area requirements, screening, buffers, and
landscaping for group developments.
5.5.5.4.2. Water, Sewer, and Drainage: Adequate provisions for water
supply, sanitary sewerage, and storm drainage shall be
installed by the developer according to the plans and
specifications approved by the proper authorities.
5.5.5.4.3. Access and Egress: shall conform to the Driveway Regulation
of the South Carolina Department of Transportation, the
Town of Chapin’s Unified Development Ordinance (UDO), and
the Traffic Impact Study findings.
5.5.5.4.4. Manufactured Homes: Shall comply with all relevant
provisions for manufactured homes and manufactured home
parks, if applicable.
3/30/23 MRB Draft
23
5.5.5.4.5. Enforcement: No building permits shall be issued and no
connection to a public water system or public sewer system
shall be made until the construction drawings for the group
development are approved by the Planning Commission staff
and so noted on prints of the development plan.
5.5.6. Planned Developments (PD)
5.5.6.1. Purpose and Intent: The PD is intended to encourage innovative land
planning and site design concepts that cannot be achieved by other
mechanisms provided by this Ordinance. PDs should achieve a high level
of environmental sensitivity, aesthetics, high quality development and
other community goals by:
5.5.6.1.1. Allowing greater freedom in selecting the means to provide
access, open space and design amenities.
5.5.6.1.2. Promoting quality urban design and environmentally sensitive
development by allowing development to take advantage of
special and unique site characteristics, locations, building
types and land uses.
5.5.6.2. Process and Applicability
5.5.6.2.1. PDs are considered a two-step process. First, there is a
Rezoning which follow the general procedures of Article 10.
Second, a Final Plat approval, per Article 10 shall occur. A
complete master plan and written report shall be developed
and submitted for approval as part of the rezoning process in
order to determine the desired standards and design of the
project. Those documents shall be submitted in accordance
with the following standards:
5.5.6.2.1.1. Master Plan: Applicants shall first develop and
present a master plan, complying with the Sketch
Plan requirements in Article 10, for the entire
parcel which includes, but is not limited to:
5.5.6.2.1.1.1.Size: Size, in acres, shall be listed on
the master plan. For redevelopment
sites PDs shall have a minimum of 4
acres. For all other developments
PDs shall have a minimum of 10
acres. If the project is intended to be
developed in phases, the master
plan shall include all phases.
3/30/23 MRB Draft
24
5.5.6.2.1.1.2.Districts: Land allocations by zoning
district, including specific
modifications to the Ordinance
requirements of those districts
clearly highlighted.
5.5.6.2.1.1.3.Street Layout and Regulating Plan:
the design and location of the
streets shall be provided. Streets
shall conform with the street
sections in Article 5 of this
Ordinance. Additional bicycle and
pedestrian circulation shall also be
indicated.
5.5.6.2.1.1.4.Lot Layout: Proposed subdivisions of
property, required open space,
street regulating plan, neighborhood
structure(s). The PD shall have
provisions to allow for a systematic
methodology to provide a variety of
lot sizes.
5.5.6.2.1.1.5.Open Space: Open space
requirements are 1.5 times the
standards set in Article 5 with the
exception that a minimum of 10%
open space is required for all PDs,
regardless of size or zoning district.
These should be clearly indicated on
the master plan.
5.5.6.2.1.1.6.Stormwater Requirements:
Stormwater shall be considered on a
PD-wide basis and the general
locations shall be indicated.
Floodplain information shall also be
included on the master plan.
5.5.6.2.1.1.7.Resources: The general location of
all historic, cultural, and
environmentally sensitive resources
shall be depicted on the master plan
5.5.6.2.1.2. Written Report: A written report shall be
submitted to explain the type, nature, intent and
characteristics of the proposed development, and
shall specifically include:
5.5.6.2.1.2.1.Site Description: A general
description of the proposal,
3/30/23 MRB Draft
25
including a detailed description of
the site, location, context, and any
cultural, environmental and/or
historic resources.
5.5.6.2.1.2.2.Vision Statement: The goals, tenets,
any special initiatives which the
development intends to achieve
shall be clearly identified for review
and discussion.
5.5.6.2.1.2.3.Incompatibilities: A detailed
description of the provisions of the
Ordinance which prevent the
development, as desired shall be
provided. This shall include analysis
showing how the general Land
Development standards in Article 5,
Permitted Use Table in Article 4, and
Zoning Districts in Article 3 limit the
intended development.
5.5.6.2.1.2.4.Modification to Ordinance: A
detailed description of exceptions or
variations from the requirements of
this Ordinance, per the
incompatibilities listed above. All
items not explicitly listed as
modifications will be subject to the
requirements of this Ordinance.
5.5.6.2.1.2.5.Land Allocation: Tables showing the
total number of acres in the
proposed development and the
percentage designated for each
proposed type of land use, including
open spaces, recreation areas, public
facilities, wetlands and wetland
impacts. This should be coordinated
with the Districts as shown in the
master plan. If the development is
intended to be phased, the phasing
plan shall be indicated on the tables.
Residential density at 16 d.u./acre?
5.5.6.2.1.2.6.Program: A complete development
program, including number of
residential units and proposed
densities, building types, minimum
3/30/23 MRB Draft
26
and maximum lot sizes, and square
feet and identification of other
nonresidential uses.
5.5.6.2.1.2.7.Building Design Standards:
guidelines to achieve aesthetics and
high-quality development shall be
included. These may be further
detailed in the covenants after all
Town approvals have been secured.
5.5.6.2.1.2.8.Compatibility Statement: A
statement of how the proposed
development is consistent adopted
plans and documents of the Town of
Chapin or Lexington County.
5.5.6.2.1.2.9.Traffic Impact Study (TIS): A Traffic
Impact Study to be performed as
outlined in Section 5.6.
5.5.6.2.1.2.10. Other: Additional relevant
information as requested by the
Administrator.
5.5.6.2.1.3. Performance Guarantee: Before approval of a PD,
the Town Council may require a contract with
safeguards satisfactory to the Town guaranteeing
completion of the development plan in a period
to be specified by the Town, but which period
shall not exceed 5 years unless extended by the
Town for due cause show. Such guarantee may
include the submission of a performance bond in
an amount set by the Town.
5.5.6.2.1.4. Final Plat: Upon approval of the Rezoning
(inclusive of the master plan), the applicant shall
proceed towards approval of a Final Plat Article
10.
5.5.6.2.2. Expiration of Approval: The Town shall have the right to
review a concept plan approved as part of a PD when no
building permits have been issued in the past 5 years, and
may choose not to issue further permits within the PD until a
revised concept plan has been approved.
5.5.7. Previously Approved Planned Developments
5.5.7.1. Purpose: The intent of this section is to be utilized only for the
continuation of previously established and approved Planned
Developments before the enactment of this Ordinance.
3/30/23 MRB Draft
27
5.5.7.2. Minor Plan Amendments Permitted by the Administrator: The
amendment of previously approved PDs shall be approved by the
Administrator, if the amendment results in a development intensity that
is no greater than the previously approved intensity in terms of total
square feet, total number of units, height, and build-upon area.
Additionally, a minor plan amendment shall be limited to technical
considerations that could not be reasonably anticipated during the
approval process, or any other change that has no material effect on the
character of the approved PD development or any of its approved terms
or conditions.
5.5.7.3. Major Plan Amendments Permitted by Town Council Approval Only: All
major changes not subject to the section above, shall be reviewed by
the Planning Commission (PC) and approved by Town Council in
accordance with the procedures outlined in Section 5.5.4.2.
5.5.7.4. Any existing PD may choose to rezone to a standard Town zoning
district by going through the rezoning process in accordance with the
procedures outlined in Article 10.
5.6. Traffic Impact Study
5.6.1. Applicability
An impact study shall be required if a proposed project:
5.6.1.1. Produces 50 peak hour (AM, PM, or Midday) two-way trips or more; or
5.6.1.2. Produces 500 daily (24 hour) two-way trips or more; or
5.6.1.3. Expansion of existing development that would produce additional
traffic, meeting or exceeding the thresholds within this section. When
determining whether the project meets the threshold, trips from the
existing land use shall be included in the trips that are considered
“produced” by the project.
5.6.2. Application Process
A TIS shall be completed as the first step of the project approval process. Prior
to the submission of any TIS and preliminary plat, the applicant shall complete
and submit a Traffic Impact Study Requirement Evaluation form obtained from
the Administrative Official’s office. The Town’s Transportation Engineer will
evaluate the request and determine whether a TIS is required. The TIS is the
responsibility of the applicant. The TIS shall be prepared in accordance with the
Traffic Impact Study Guidelines adopted by the Town of Chapin and obtained
from the Administrative Official’s office. All traffic studies must be prepared
under the supervision of, and signed, stamped and dated by, a professional Civil
Engineer registered in South Carolina. Coordination with other entities in the
county government or South Carolina Department of Transportation (SCDOT)
3/30/23 MRB Draft
28
shall be the responsibility of the applicant. The applicant will be required to use
a Town approved firm to complete the TIS. A list of approved consulting firms
will be provided upon the determination that a TIS is required. All phases of a
development are subject to review, and all traffic plans for the entire
development shall be integrated with the overall traffic analysis.
5.6.3. Contents Traffic Impact Study (TIS)
1. Study Contents: At minimum a TIS shall include the following:
1. Introduction: A written narrative describing the proposed land use(s), size, and
projected opening date of the project and all subsequent phases.
2. Existing Land Use
3. Proposed Land Use
a. Location and context
b. Description of development
c. Zoning Characteristics
d. Site Plan
4. Analysis
a. Existing traffic volumes on all roads to be accessed using current SCDOT
Annual Average Daily Trip (AADT) counts where possible.
b. Infrastructure Analysis
c. Trip generation tables
d. Trip distribution patterns
e. Turning movement diagrams for peak hours
f. Access analysis
g. Traffic Control Devices
h. Mitigation and Alternatives
i. Summary
3. Responsibility for Costs of Improvements: The costs of implementation of an
approved mitigation program shall be the responsibility of the applicant. No
certificates of zoning compliance or building permits shall be issued unless
provisions of the TIA are met