BAR Policy Statement Revisions
City of Charleston · Berkeley County · meeting of Oct 14, 2026 · Agendas
Open the original document More from City of Charleston
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
BOARD OF ARCHITECTURAL REVIEW
Policy Statement for Lighting
CITY OF CHARLESTON DEPARTMENT OF PLANNING & PRESERVATION,
2 George Street, Third Floor Charleston, South Carolina 29401 843-724-3765 www.charleston-sc.gov/bar
1. Lighting fixtures shall be compatible with the architectural style, scale, spatial relationships and
character of the building and site.
2. Installation of lighting fixtures shall have minimal impact on historic materials
3. Light sources shall be shielded, concealed, or directed downward to minimize glare and light
spillover onto adjacent properties and the public right-of-way.
4. Submit cuts of exterior building and site light fixtures and show all fixture locations on the drawings,
including the elevations, not just on the electrical plan.
5. Staff cannot approve uplighting of buildings. Uplighting is generally reserved for specimen trees
only.
6. One uplighting fixture (see attached) approved per tree.
7. Lights are to be warm white and within a 2500K to 3500K temperature range. No colored lighting
will be permitted.
Parking Areas:
8. Concrete bases for parking lot light fixtures are to remain unpainted. The use of traffic yellow is not
permitted.
9. Parking Structures:
a. Fixture style for rooftop level: pole mounted fixtures are not to be used. Fixtures are to be
wall mounted and are not to extend above the top of the roof parapet.
b. Fixture style for all levels: generally, fixtures are to have a concealed light source, semi-
opaque lens or shielded to reduce glare and excessive light spillage outward from the
building.
c. Lighting level are not to exceed fifteen (15) foot candles except as required for egress.
* See Pool Policy for pool lighting
* See MEP Policy for placement of equipment
This policy statement was approved by resolution by the Board of Architectural Review -Large on _____ and by the
Board of Architectural Review-Small on September 24, 2026.
Source: City of Charleston website. First collected Oct 14, 2026.