BAR-L Meeting (Appendix B)

City of Charleston · Berkeley County · meeting of Aug 31, 2026 · Agendas

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Facilities | Environmental | Geotechnical | Materials i Archaeological Work Plan 106 Coming Street Project 205 New Construction Charleston, Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 DES-BCM Reference No. HQE-MAZM-OBJ2E SCDAH SHPO Project No. 25-JS0212 Prepared for: College of Charleston 66 George Street Charleston, SC 29494 Prepar ed by: Blue Nels on, MA, RPA Terracon Consultants, Inc. Charleston, South Carolina Archaeological Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials i EXECUTIVE SUMMARY The College of Charleston is proposing construction of a student housing residence hall. The parcel includes a portion of what was laid out as the second official municipal cemetery for the City of Charleston in 1794. Given the potential for archaeological remains as well as human burials, the following Archaeology Work Plan has been prepared by Terracon for submittal to the South Carolina Department of Archives and History (SCDAH) on behalf of the College of Charleston to satisfy requirements of the Coastal Zone Consistency (CZC) permit application. The Department of Environmental Services (DES) Bureau of Coastal Management (BCM) permit reference number for this project is HQE-MAZM-OBJ2E and SHPO Project Number 25- JS0212. The project requires a National Pollutant Discharge Elimination System (NPDES) Construction Stormwater General Permit and a CZC Certification. The Clean Water Act (CWA) created the NPDES program, and the U.S. Environmental Protection Agency (EPA) has delegated the authority of issuing NPDES permits to the states. As such, the states are empowered to administer their own permitting program, as long as it complies with the requirements of the NPDES permit. Thus, State-issued NPDES permits are not considered a federal undertaking . In South Carolina, DES issues and manages NPDES permits. The BCM issues the CZC certificates as part of the permitting process for ground disturbance in the coastal zone areas of South Carolina. The College is an institution of higher education of the State, authorized by the Higher Education Act to issue higher education facilities revenue bonds for the purpose of financing or refinancing in whole or in part the cost of acquisition, construction, reconstruction, renovation and improvement of land, buildings, and other improvements to real property constituting Higher Education Facilities under the General Bond Resolution and the Higher Education Act. No federal funding is anticipated as part of this project and the College’s land holdings are state-controlled. Terracon understands that the College of Charleston has reviewed alternatives to construction at 106 Coming Street. In the event that the current project development proceeds as planned, the following archaeological work plan provides overarching archaeological procedures for documenting cultural features, procedures for the discovery of human remains, protocol for unanticipated discoveries, artifact and cultural material analyses, significance evaluation, curation, and reporting. A discussion of these overarching protocols is followed by an outline of the stages of archaeological work, as currently proposed. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials ii Approximate Project Area Outlined in Red Facilities | Environmental | Geotechnical | Materials iii Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 CONTENTS EXECUTIVE SUMMARY ................................................................................ i ACRONYMS .............................................................................................. v PROJECT BACKGROUND AND OVERVIEW ...................................................... 1 PROPOSED FIELD METHODOLOGY OVERVIEW ............................................... 3 Geophysical Surveys ...................................................................................................3 Archaeological Monitoring ............................................................................................4 Site Security ..............................................................................................................5 Unit Excavation ..........................................................................................................6 Documenting Archaeological Features ...........................................................................7 ARCHAEOLOGICAL ANALYSES, NRHP EVALUATION, CURATION, AND REPORTING 9 Archaeological Analyses ..............................................................................................9 NRHP Evaluation ......................................................................................................10 Reporting ................................................................................................................12 Curation ................................................................................................................13 CEMETERY ARCHAEOLOGY ....................................................................... 14 Public Notice and Public Consultation ..........................................................................15 Public Notice ............................................................................................................16 Procedures for the Discovery of Human Remains ..........................................................16 Excavation Methodology ............................................................................................17 Field Laboratory Requirements ...................................................................................18 General Grave Excavation and Documentation .............................................................19 Commingled Human Remains ....................................................................................20 Stacked and Mass Burials ..........................................................................................20 Analysis and Reporting ..............................................................................................21 PROPOSED STAGES OF WORK .................................................................. 23 Stage 1: Pre-Disturbance GPR Survey .........................................................................23 Stage 2A: SWPPP Best Management Practices (BMP) Perimeter Installation .....................23 Stage 2B: Geophysical Survey Enabling Demolition ......................................................25 Stage 3: Post-Removal Geophysical Survey .................................................................26 Stage 4A: Archaeological Ground Truthing ...................................................................33 SHPO Updates .........................................................................................................35 Archaeology Ground Truthing Methodology: Trench Excavation ......................................35 Archaeology Ground Truthing Methodology: Mechanical Stripping ...................................36 Project Infrastructure................................................................................................36 Field Office ..............................................................................................................36 Screening Stations ...................................................................................................37 Stage 4B: Archaeological Site Excavation ....................................................................37 Features ................................................................................................................38 Archaeological Analyses ............................................................................................39 Reporting ................................................................................................................39 Additional Monitoring ................................................................................................39 PROTOCOL FOR UNANTICIPATED DISCOVERIES ........................................... 41 GLOSSARY OF TERMS .............................................................................. 43 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials iv APPENDICES APPENDIX A: COLLEGE OF CHARLESTON MITIGATION ASSESSMENT APPENDIX B: SITE WORKER INFORMATIONAL PAMPHLET APPENDIX C: COMMUNITY ENGAGEMENT COUNCIL APPENDIX D: PROCEDURAL SUMMARY MATRIX AND LEGEND APPENDIX E: COLLEGE OF CHARLESTON COMMITMENT LETTER APPENDIX F: COLLEGE OF CHARLESTON ACHP POLICY OUTLINE APPENDIX G: INFORMATION SHARING & FEEDBACK LOOP APPENDIX H: TRIBAL OUTREACH AND NAGPRA APPENDIX I: SWPPP– STORM WATER POLLUTION PREVENTION PLAN APPENDIX J: TERRACON GEOTECHNICAL REPORT EXCERPT APPENDIX K: SHPO CORRESPONDENCE Facilities | Environmental | Geotechnical | Materials v Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 ACRONYMS Acronym Meaning ACHP Advisory Council on Historic Preservation BCM Bureau of Coastal Management CEC Community Engagement Council CFR Code of Federal Regulations CWA Clean Water Act CZC Coastal Zone Consistency DES-BCM Department of Environmental Services-Bureau of Coastal Management EMI Electromagnetic Induction EPA Environmental Protection Agency ESP Early Site Package (SWPPP & Erosion Control Plans) GIS Geographic Information System GNSS Global Navigation Satellite System GPR Ground Penetrating Radar NPDES National Pollutant Discharge Elimination System NPS National Park Service NRHP National Register of Historic Places QGIS Quantum GIS RPA Registered Professional Archaeologist RTK GNSS Real-Time Kinematic Global Navigation Satellite System SCDAH South Carolina Department of Archives and History SCIAA South Carolina Institute of Archaeology and Anthropology SHPO State Historic Preservation Office SWPPP Stormwater Pollution Prevention Plan USDA US Department of Agriculture UTM Universal Transverse Mercator UTV Utility Task Vehicle XRF X-Ray Fluorescence Facilities | Environmental | Geotechnical | Materials 1 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 PROJECT BACKGROUND AND OVERVIEW This Archaeology Work Plan has been prepared by Terracon for submittal to the South Carolina Department of Archives and History (SCDAH) on behalf of the College of Charleston to satisfy requirements of the Coastal Zone Consistency (CZC) permit application. The Department of Environmental Services (DES) Bureau of Coastal Management (BCM) permit reference number for this project is HQE-MAZM-OBJ2E and SHPO Project Number 25-JS0212. The project requires a National Pollutant Discharge Elimination System (NPDES) Construction Stormwater General Permit and a CZC Certification. The Clean Water Act (CWA) created the NPDES program, and the U.S. Environmental Protection Agency (EPA) has delegated the authority of issuing NPDES permits to the states. As such, the states are empowered to administer their own permitting program, as long as it complies with the requirements of the NPDES permit. Thus, State-issued NPDES permits are not considered a federal undertaking. In South Carolina, DES issues and manages NPDES permits. The BCM issues the CZC certificates as part of the permitting process for ground disturbance in the coastal zone areas of South Carolina. The College is an institution of higher education of the State, authorized by the Higher Education Act to issue higher education facilities revenue bonds for the purpose of financing or refinancing in whole or in part the cost of acquisition, construction, reconstruction, renovation and improvement of land, buildings, and other improvements to real property constituting Higher Education Facilities under the General Bond Resolution and the Higher Education Act. No federal funding is anticipated as part of this project and the College’s land holdings are state-controlled. Terracon understands that the College of Charleston has reviewed alternatives to construction at 106 Coming Street ( Appendix A ). Furthermore, Terracon acknowledges that the local governing body, pursuant to SC Code 27-43-10 through 27-43-40, may not ultimately consent to the removal of the Second Official Municipal Cemetery, or that the College of Charleston may decide to not develop the 205 Coming Street site. In the event that the current project development proceeds as planned, the following archaeological work plan provides overarching archaeological procedures for: 1) Documenting Archaeological Features; 2) Procedures for the Recovery of Human Remains; 3) Protocol for Unanticipated Discoveries; 4) Analyses, Significance Evaluation, Curation, and Reporting. A discussion of these overarching protocols is followed by an outline of the stages of archaeological work, including the excavation of human remains (if present), as currently proposed, in the Procedural Summary Matrix and Legend. This document includes detailed work plans, including the processes and excavation plans for the documentation and relocation of the cemetery ( Cemetery Archaeology , below); as well as the methods and processes for the general archaeological field investigation, laboratory analyses, and reporting associated with the proposed project. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 2 Terracon will submit a standalone research design to the SHPO for review and approval prior to the initiation of subsurface archaeological excavations. This research design will include the approved methodological approaches summarized in this work plan, present explicit research questions, and include a review of relevant gray literature and academic literature. This research design will help establish the context of archaeological materials and/or human remains, if present, as well as define the criteria for National Register of Historic Places (NRHP) eligibility for the site within that context. The project parcel includes a portion of the second official municipal cemetery for the City of Charleston. Beginning in 1794, the Charleston City Council passed a resolution officially opening the cemetery for burials. The cemetery occupied nearly the entire western half of the city block bounded by Calhoun, Coming, Vanderhorst, and St. Philip Streets. A few years following the closure of the cemetery in 1807, the city divided and sold the cemetery parcel for residential development. From documentary evidence it appears these lots were built upon quickly as the cemetery disappeared from maps and plats in the early nineteenth century. Although no archaeological site has been previously documented within the proposed project area and the level of disturbance there is currently unknown, it is possible that intact portions of the cemetery, if they exist, could be considered eligible for the NRHP under Criterion D for exhibiting the potential to yield important information associated with the largely undocumented enslaved and disenfranchised population of Charleston at the turn of the nineteenth century. Furthermore, if intact structural remains are encountered in situ or cultural features associated with the historical occupations of the site are documented, it is possible they could be considered eligible for the NRHP under Criterion D for exhibiting the potential to yield important historical information regarding the growth and development of Charleston. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 3 PROPOSED FIELD METHODOLOGY OVERVIEW Archaeological investigations discussed in the following work plan include strategies for identification, documentation, excavation, and analysis of cultural resources. The following methodology overview acknowledges that changes to the proposed project methodology are anticipated due to the complex nature of the site due to multiple components and the potential for human remains. The proposed stages of this archaeological work plan provide for work stoppages, additional SHPO consultation, and plan revisions to be adopted as Amendments (in consultation with SHPO and other stakeholders). Amendments to the approved work plan may arise through the established information- sharing and feedback loop. Proposed amendments will be informed by ongoing project development, the results of the archaeological investigations, and engagement with the community and the Community Engagement Council (CEC), including recommendations generated through consultation activities. As the consulting agency, all formal requests for amendments to work plans, as well as their ratification, will be submitted to the South Carolina SHPO for review. SHPO may elect to accept, deny, or provide comments requiring revision or further consideration. The College of Charleston acknowledges that this formal ratification process may evolve over the course of the project as development progresses, additional information becomes available, or consultation needs expand. Field methods for this project may include geophysical surveys, archaeological monitoring, unit excavations, feature documentation, and disinterment of human remains (if present). Geophysical Surveys Terracon proposes conducting geophysical surveys of unobstructed areas within the project area. This will consist of ground penetrating radar (GPR) and electromagnetic induction (EMI) surveys. The use of a second geophysical instrument (EMI) increases our ability to confidently interpret results, which can be helpful in identifying historical cemetery sites. Following the completion of the geophysical surveys, a Post-removal Geophysical Survey Report will be provided to SHPO and the South Carolina Department of Environmental Services Bureau of Coastal Management (DES-BCM) for review. This report will describe potential anomalies recorded as a result of the GPR surveys. It is anticipated that the methodologies for subsequent archaeological activities may change as a result of the geophysical survey. The Geophysical Survey Report will discuss the results of the geophysical survey as well as proposed alterations to the Archaeological Work Plan, if warranted. The College, in accordance with the Community Engagement Council, is moving forward with a pre-disturbance GPR survey. The review, methodology, reporting, and approval of that work is outside the scope of Terracon Consulting, Inc and will be submitted directly by the College. Results may be used to inform project methodology once approved by SHPO and provided to Terracon. Facilities | Environmental | Geotechnical | Materials 4 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Geophysical Field Exploration Methods Terracon will conduct the second geophysical survey using GPR and EMI to survey the project area. Prior to the geophysical survey, during Stage 2a, an arbitrary grid will be established in a Geographic Information System (GIS) and will consist of 30-x-30-m blocks. The survey transects will be conducted approximately north to south to maximize the potential for crossing unmarked graves, which are typically oriented approximately east to west. The EMI survey will utilize a CMD-MiniExplorer 6L electromagnetic conductivity meter, or similar. Data will also be collected in 30-x-30-m blocks, or similar, along the same axis as the GPR survey. EMI data will be collected in 25 cm transect spacing to ensure the data is sufficiently dense. EMI data will be processed in Terrasurveyor64, or similar. An Emlid Reach RS2+ real-time kinematic global navigation satellite system (RTK GNSS system) with a horizontal accuracy of 0.7 cm and a vertical accuracy of 1.4 cm will establish the geophysical survey grid and permanent datums at each survey location. Once the GPR survey is completed and the data has been processed, Terracon will provide the SHPO with GPR amplitude depth slices for independent review. Terracon will not proceed with additional fieldwork until the SHPO is given the opportunity to review geophysical data and anomalies/potential burials. The College will update the public on findings throughout the work performed through the project website at https://coming-street- commons.charleston.edu/, in accordance with SHPO request dated September 5, 2025. It should be noted that information concerning locational data of human remains will remain redacted until the completion of the project and sensitive information (such as photographs of skeletal remains) will not be made publicly available. Archaeological Monitoring Terracon will notify SHPO 24 hours prior to archaeological monitoring fieldwork to inform them of the work so they can provide informed, professional responses to any inquiries or concerns from the public their office may receive. Given the potential for encountering cultural features, including human skeletal remains, archaeological monitors will be present during all ground disturbance work including Storm Water Pollution Protection Plan (SWPPP) infrastructure requirements and demolition work (including the removal of asphalt pavement from the site), or any other subsurface disturbances. If mechanical excavators are on site, Terracon proposes that monitors work in pairs, assigning two monitors—including at least one human skeletal analyst—to each excavator. If multiple excavators are operating, each machine will be supported by its own dedicated two -person monitoring team. Prior to initiating any work on site, contractors will be educated on site processes and what to look out for. In addition to creating a pamphlet with bullet points ( Appendix B ), Terracon will brief any contractors working on site about the legal ramifications for desecrating a burial, process for reporting human or cultural remains, and what to look out for. If intact archaeological deposits are encountered during monitoring, the monitors will instruct the mechanical excavator to stop work and/or relocate no fewer than 25 meters away while the feature is documented. If cultural features are encountered during this work, they will be Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 5 preliminarily documented (photographed, sketch map, notes, and securing the feature from additional impacts) but not excavated. If potentially significant cultural features (such as intact structure foundations, privies, or other larger features) are uncovered during the geophysical enabling demolition efforts, temporary avoidance of these areas by ground- disturbing activities may be necessary pending additional SHPO coordination and/or a site visit. The area surrounding the cultural feature would be secured and marked as an avoidance area with surveyor’s flagging tape and ground stakes. It is expected that geophysical enabling demolition work would progress elsewhere on the site and that such avoidance would not cause significant project delays. Terracon would consult with SHPO prior to the excavation of features encountered during monitoring. Archaeological monitors will be given sufficient time to inspect exposed areas and/or record cultural materials and/or features. “Sufficient time” is variable based on feature type, size, and complexity. An archaeological monitor can generally conduct preliminary documentation activities (photography, sketch plan, notes, and securing the feature from additional impacts) within an hour; however, if additional time is required work can continue in another portion of the site, under the supervision of a monitor, while the feature is documented to archaeological standards. Terracon will provide the SHPO with a detailed description of the features and sufficient supporting documentation to aid SHPO in rendering an NRHP eligibility determination. Terracon will send weekly archaeological monitoring technical memorandums to SHPO to keep them apprised of site conditions and results of work. The intent of archaeological monitoring is to identify and assess intact, subsurface cultural features and artifact concentrations as well as potential burials or human remains. With the exception of a representative sample of temporally or culturally diagnostic artifacts (which may be collected, as warranted, from disturbed fill or exposed ground surface), no systematic collection of unprovenienced artifacts or cultural materials from previously disturbed deposits or construction fill would occur. Similarly, analysis would be limited to artifacts and cultural materials recovered from intact feature contexts, discussed below. Furthermore, if human remains are encountered during archaeological monitoring the Charleston County Coroner will be called to analyze the remains. If they are determined historical, they will be left on site, reburied in place, georeferenced using GPS, and documented in field notes. Human remains will not be removed from the site unless the local governing body, the City of Charleston, approves the removal, and SHPO has had an opportunity to review and approve Terracon’s project Research Design document. Site Security Establishing site security and privacy is a top priority and will be implemented during Stage 2A. The project area should be enclosed with a fence that is 6–8 feet high, durable, and equipped with privacy screening. Privacy screening serves two critical purposes:  It prevents public exposure to human remains during excavation and removal, ensuring dignity for the deceased. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 6  It helps deter looters or vandals who might attempt to identify areas of interest by observing fieldwork. A lockable gate should be included to secure the site when crews are not present. In accordance with SC Code 16-11-600, Notice of trespassing , “No Trespassing” signs will be properly posted in at least four (4) conspicuous locations around the site, including corners and all primary entry/exit points. Under 16-11-600, entering the property after a “No Trespassing” notice has been posted or personally communicated is a misdemeanor, punishable by up to a $100 fine and/or up to 30 days’ imprisonment. The statute further provides that evidence of proper posting constitutes conclusive notice for purposes of enforcing trespass violations. Because proof of posting is treated as conclusive notice, a simple posting log should be maintained that documents the following:  Date/time posted  Locations (sketch map)  Method of installation  Photos of each sign from the approach direction  Name(s) of personnel who installed the sign  Witness name/signature  Maintenance checks and log (inspection dates, condition noted, and actions taken if damaged/missing) Furthermore, SC Code 16-11-780 prohibits individuals from intentionally entering properly posted private or state lands to disturb, excavate, or remove archaeological resources, defined as artifacts or human-related material remains at least 100 years old that possess scientific or commercial value. Violations carry escalating penalties from misdemeanor to felony, with fines of $1,000–$5,000 and up to five years’ imprisonment. This law also allows for seizure and forfeiture of equipment used in felony violations and authorizes civil recovery of damages by the landowner or the State. During excavation of burials or mortuary features, shade tents or larger event tents should be used to provide additional privacy, particularly from aerial observation. Security cameras have been installed on site and will be monitored by 24-hour surveillance. The site fencing and security plan will be provided to SHPO for review in compliance with City of Charleston Technical Review Board (TRC) approved permit site plan. Unit Excavation Following the completion of geophysical field surveys, the results of the geophysical surveys will be reviewed by SHPO and Terracon to determine the portions of the site to be investigated with exploratory trenches (see Stage 4A, below). Pending the results of these surveys and in consultation with SHPO, Terracon may use one or more 1-x-5-meter trenches to investigate the location of potential burials and other areas specified in Stage 4A of the work plan. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 7 Following completion of trench excavations and review by SHPO, general unit excavation will proceed with the systematic excavation of 1-x-1-meter units within 5-x-5-meter grid blocks. Each block will be comprised of twenty-five 1-x-1-meter units which would be identified by the northing and easting of the southwest unit corner. Units would be excavated in arbitrary 10-cm levels within natural strata (clearly redeposited or modern fill would be excavated as a single stratum rather than by arbitrary 10-cm levels). Excavation will continue until the soil profile indicates a reasonable depth below disturbed subsoil and two culturally sterile, natural soil levels are encountered. If non-burial cultural features (such as structural remains, privies, wells, or trash pits) are noted, these features would be excavated according to the Documenting Archaeological Features procedures outlined below. Human burials or likely human burials would be documented in accordance with procedures outlined in the embedded Cemetery Archaeology plan below. Excavated soil from the excavation units would be screened through a 1/4-inch mesh screen for standardized recovery of cultural material. Field notes will be recorded on standardized test unit and block unit forms and will include unit/block designators, depth, general conditions, amount of cultural material recovered and brief descriptions of the material, and other pertinent information such as presence of and relationships between features. A Munsell chart will be used to record soil colors, and US Department of Agriculture (USDA) soil texture classifications will be used to characterize soil textures. If cultural material is encountered it will be placed into 4-mil plastic bags that will be labeled, written in black permanent marker, with pertinent project information including: field specimen (F.S.) number, project number, project name, block number, unit number, level, stratum, depth, crew initials, date, and number of bags associated with that F.S. number. Once a unit is completed, associated field forms would be reviewed for consistency, readability, and errors, and then turned into the field office/lab with all cultural material recovered from that unit. Unit paperwork and artifact bags will be reviewed by the onsite field director for accuracy and consistency, and any errors or issues will be addressed immediately to ensure quality data recording. Documenting Archaeological Features Since the closure of the cemetery, the area has undergone several cycles of construction and demolition. Historical records also indicate that multiple structures have been built and later removed from within the proposed project boundaries. As such, it is anticipated that historical architectural remains and features may be encountered during the investigations. These remains may be evident as foundations, piers, privy pits, and/or other non-structural features, such as middens or refuse pits. If cultural features or in situ architectural or structural remains that are not associated with modern or historical dumping episodes are encountered during fieldwork, the remains will be assigned a feature number, exposed, and documented with standardized field notes, measurements, mapping, and photography. Following initial documentation, SHPO would be contacted and provided with a detailed description of the feature(s) and sufficient supporting written and photographic documentation to aid them in consulting with Terracon on the appropriate excavation or sampling strategies, as warranted. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 8 Procedures for the documentation and excavation of potential burial features are presented in the Cemetery Archaeology section, below. Terracon plans to begin block excavations at the locations of documented former structures, areas exhibiting the presence of potential structural remains, and other obvious non-mortuary cultural features identified during the geophysical surveys and subsequent trench excavations. Cultural features would be excavated by methods appropriate to their size and type and in consultation with SHPO, if warranted. In general, feature locations will be referenced to the general site plan and written descriptions of features will include dimensions, shape, soil matrix color and texture, depth below surface, stratigraphy, and recovered materials. Cultural features will initially be exposed in plan view, then drawn to scale, photographed, and recorded on standardized unit and block forms. Once documented in plan view, the feature will be bisected to record the profile in cross-section then drawn to scale, photographed, and recorded on standardized unit forms. The depth and type of fill material used, as well as the stability of the fill, would dictate the extent/depth of the feature excavation. For example, smaller features such as post holes would be bisected, half of the fill removed, and one profile recorded. Pit features (refuse pits) may be similarly bisected and excavated, if warranted. Large or deep features (e.g., wells, privies) will be sampled or bisected, dependent upon the stability and depth of the fill. Once the cross-section profile is completely exposed, it would then be drawn to scale, photographed, and recorded on standardized unit forms. Once the profile documentation is complete, the remaining feature fill will be screened for cultural material. Builder’s trenches may be investigated with smaller test unit excavations or similar methods, as appropriate. For example, a 1-x-1-m test unit may be excavated along one side of intact structural remains to document the builder’s trench and determine if there are diagnostic artifacts located within the historical backfill. Architectural features (e.g., piers, foundation remnants) may be fully exposed and documented with measured drawings and photographs. If potential burial features or human remains are encountered within a non-burial feature or structural remains that appear to have intruded upon a burial, the documentation and excavation of the burial will be given preference over the documentation of the historic period features. Specific methodology for burial or grave excavations are presented in the Cemetery Archaeology section, below. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 9 ARCHAEOLOGICAL ANALYSES, NRHP EVALUATION, CURATION, AND REPORTING Archaeological Analyses With the exception of potential human remains and associated burial artifacts (including coffin hardware, nails, or other associated mortuary furniture), cultural material will be stored with chain of custody forms at Terracon’s Charleston office in a dedicated, secure, temperature- controlled room until they are turned over to SCIAA. This Terracon office space will serve as the archaeology laboratory and storage space throughout the duration of the proposed project. Artifacts will be processed in compliance with 36 CFR 79 and SCIAA’s curation guidelines 1 . Specific procedures for the recovery and handling of human remains and associated cultural materials are presented in the Cemetery Archaeology section below. Incoming materials to the archaeology laboratory will be checked against the field specimen log to confirm that each bag is correctly labeled with pertinent information including site number, block number, provenience, stratum, depth, crew initials, and field date. Following initial cataloging, artifacts will be:  Washed or brushed free of soil.  Sorted by block number, unit number, raw material class.  Labeled by provenience.  Dried, counted, weighed, analyzed, and placed in 4-mil polyethylene, zipper-seal archive-quality bags. Artifact analysis seeks to determine the function (if unknown) and temporal range of archaeological sites. During artifact analysis, comparative literature will be consulted using Terracon’s in-house library and additional resources and reference materials as warranted. In accordance with the South Carolina Standards and Guidelines for Archaeological Investigations, updated 2024, analysis will follow established classifications and accepted regional typologies. Basic artifact analysis will include the following tasks:  Assign an accession, or artifact identification, number.  Document material type.  Document class (e.g., projectile point, lithic flake, bead, etc.).  Record weight and count.  Record dimensions, if appropriate.  Document diagnostic type, if known (e.g., Creamware, Clovis, etc.).  Record other noteworthy attributes. No specialized analyses (e.g., faunal analysis, ethnobotanical analysis, radiocarbon dating, DNA-testing, etc.) or artifact conservation are anticipated as part of this project; however, if such materials are recovered from an intact feature context, recommendations for future 1 South Carolina Institute of Archaeology and Anthropology. 2005. Curation, Loan, and Access Policy. https://sc.edu/study/colleges_schools/artsandsciences/sc_institute_archeology_and_anthropology/documents/cura tion_loan_access_policy.pdf Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 10 analyses would be provided in the report. Collection of representative samples for specialized analyses (e.g., radiocarbon, ethnobotanical, and/or dendrochronological) are discussed in Stage 4B, below. With the exception of a representative sample of temporally or culturally diagnostic artifacts (which may be collected, as warranted, from the disturbed fill or exposed ground surface), artifact analysis and curation would be limited to artifacts and cultural materials recovered from intact subsurface feature contexts. SHPO has requested that Terracon retain a minimum 5 percent representative sample of any loose bricks or brick fragments associated with intact architectural features (not associated with dumping or filling episodes) for potential future X- ray fluorescence (XRF) analysis. This sample will be curated with SCIAA following the completion of the project. All potential grave-related personal artifacts and other associated materials (coffin hardware, nails, etc.) will be collected, stored, and reinterred with the associated human remains by the certified funeral director. Public feedback indicates that some individuals have expressed interest in conducting DNA testing on recovered human remains. This process is inherently destructive, as it requires the removal of samples of bone or teeth to extract genetic material. While some community members may value the scientific and cultural insights such testing could provide, others may regard it as desecration and strongly oppose such analysis. The CEC should determine whether DNA testing is warranted; however, this specialized analysis is not included as part of the current work plan. The College’s commitment with the CEC will help direct the extent of this sensitive analysis with agreed upon review and updates to SHPO. Appendix C contains more information about the CEC. NRHP Evaluation The National Register of Historic Places (NRHP) is an official register listing historically significant sites and properties across the United States. The NRHP is maintained by the National Park Service; at the state level the NRHP is administered by the SHPO. As a consultant, Terracon does not determine whether a resource is eligible for the NRHP. Terracon consults with SHPO and offers NRHP recommendations for resources, but it is the SHPO who issues the determination on whether a resource is eligible for the NRHP. Due to the complexity of the proposed project, Terracon will maintain communication with SHPO to discuss findings and consult on next steps and expectations in accordance with the Procedural Summary Matrix in Appendix D . Outlined below are the general criteria evaluating a resource’s eligibility for listing in the NRHP. Archaeological significance of sites is determined using criteria defined in 36 CFR 60.4 2, in coordination with the SHPO. Guidance for applying the NRHP criteria is found in National Park Service (NPS) Bulletin 15: How to Apply the NRHP Criteria for Evaluation 3. Site significance, 2 Code of Federal Regulations Part 60–National Register of Historic Places. § 60.4 Criteria for Evaluation. https://www.govinfo.gov/content/pkg/CFR-2012-title36-vol1/pdf/CFR-2012-title36-vol1-sec60-4.pdf 3 National Park Service, U.S. Department of the Interior. 1997. National Register Bulletin: How to Apply the National Register Criteria for Evaluation. https://www.nps.gov/subjects/nationalregister/upload/NRB- 15_web508.pdf Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 11 as established by 36 CFR 60.4, may be in history, architecture, archaeology, engineering, or culture. Historic properties include buildings, structures, objects, sites, and districts. To be considered eligible for listing in the NRHP a historic property must exhibit integrity and meet one of the following criteria (36 CFR 60.4): A. Be associated with events that have made a significant contribution to the broad patterns of our history, or B. Be associated with the lives of persons significant in our past, or C. Embody the distinctive characteristics of a type, period, or method of construction, or that represent the work of a master, or that possess high artistic values or that represent a significant and distinguishable entity whose components may lack individual distinction, or D. Have yielded or may be likely to yield, information important in prehistory or history. While most archaeological sites are recommended as eligible for the NRHP under Criterion D, this criterion is somewhat vague. In order to clarify the issue of site importance, the following attribute evaluations add a measure of specificity that can be used in assessing site significance and NRHP eligibility:  Site Integrity – Does the site contain intact cultural deposits or is it disturbed?;  Preservation – Does the site contain material suited to in-depth analysis and/or absolute dating such as preserved features, botanical and/or faunal remains, or human skeletal remains?;  Uniqueness – Is the information contained in the site redundant in comparison to that available from similar sites, or do the remains provide a unique or insightful perspective on research concerns of regional importance?;  Relevance to Current and Future Research – Would additional work at this site contribute to our knowledge of the past? Would preservation of the site protect valuable information for future studies? While this category is partly a summary of the above considerations, it also recognizes that a site may provide valuable information regardless of its integrity, preservation, or unique qualities. It should be noted that cemeteries are not typically considered eligible for inclusion in the NRHP unless they also meet certain criteria considerations4. While a cemetery may qualify for listing under Criterion A (association with significant events), Criterion B (association with significant persons), or Criterion C (design), the cemetery must also meet one of the special Criteria Considerations, including deriving its primary significance from architectural/artistic distinction or historical importance (or representing the only surviving structure associated with a person or event). 4 Potter, Elizabeth Walton, and Beth M. Boland. 1992. Guidelines for Evaluating and Registering Cemeteries and Burial Places. National Register Bulletin 41. Facilities | Environmental | Geotechnical | Materials 12 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Reporting Following completion of archaeological excavation and analyses, the Data Recovery Report will be prepared detailing the results of the archaeological investigation. The technical report will adhere to the requirements of the South Carolina Standards and Guidelines for Archaeological Investigations 5 and will contain the following components, summarized in Table 1. Table 1. Report Format and Minimum Content requested by SHPO (2024). Chapter Content Title Page Lists the report title with investigation type and project location. Additionally, the client’s information, Authors, Principal Investigator’s data and signature, report status (draft/revised draft/final), and report date. Abstract Describes the project, project purpose, summarizes the report findings, summarizes resource NRHP evaluations, and summarizes management recommendations. Table of Contents Outlines the report chapters including page numbers. List of Figures/Tables Detailed lists outlining the figures and tables used in the report. Project Introduction Summarizes the purpose of the report/fieldwork, the client, the reason the undertaking is being conducted, summarizes legislation that governs the work, lists project personnel, lists the range of work dates, and includes locational maps. Environmental Setting Summarizes the general environmental characteristics including physiographic information, proximal water sources, soil characteristics and current land use. Cultural Context Provides an overview of the local cultural history associated with the site and the events that may have shaped the community. Summary of Previous Archaeological Investigations Summarizes available and known data regarding previous archaeological work that may have been conducted onsite. Research Design Provides explicit statements and poses questions that may be answered with archaeological work. Methodology Outlines the field and lab methodology. Results The results will summarize the work conducted and include feature descriptions, cultural associations, background research, brief narrative, site map, representative site photos, soil descriptions, and site significance recommendations or whether additional work is required to determine a site significance recommendation. No photographs of human remains will be included in the technical report, rather, they will be referenced and included as an appendix to avoid dissemination of sensitive media. 5 South Carolina Department of Archives and History, State Historic Preservation Office, South Carolina Institute of Archaeology and Anthropology, and the Council of South Carolina Professional Archaeologists. 2000 (Updated 2024). South Carolina Standards and Guidelines for Archaeological Investigations. https://scdah.sc.gov/sites/scdah/files/Documents/Historic%20Preservation%20(SHPO)/Programs/Programs/Review%20and%20Co mpliance/Standards_Guidelines_2024.pdf Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 13 Chapter Content Summary and Recommendations Summarize the project, list and review cultural resource data, and make recommendations for NRHP eligibility and whether additional work is recommended. References Cited Detailed list of references used during investigation. Appendices and Attachments Appendices will include the Archaeological Monitoring Report(s), SHPO concurrence letter (once obtained), artifact catalog, specialist reports or lab results, and photographic documentation of human remains. Photographs of human remains are treated as classified and not intended for public consumption; this appendix will be removed on any public- facing version of the report. Terracon will provide hard copies and a digital PDF of the technical report to SHPO and SCIAA. The entire project site will be recorded under a single site trinomial (to be determined). The Terracon Project Manager and SHPO will be evaluating the eligibility of this site against NRHP criteria throughout the lifecycle of the archaeological investigation and as features are encountered. SHPO reserves the right to present any reported findings for peer review. Peer review is generally conducted by people who have demonstrated expertise pertaining to the reporting subject matter. Following acceptance of the final report by SHPO, and in consultation and collaboration with stakeholders, the results of the investigations may be presented in a public information component, such as an online ArcGIS StoryMap, public presentation, or other published documentation, as appropriate. Copies of the final documentation will be housed at the College of Charleston Libraries Avery Research Center for African American History and Culture (See Appendix E for the College of Charleston Commitment Letter). Curation Cultural material (excluding human remains or associated grave items) recovered during the archaeological investigation will be curated in accordance with SCIAA’s Curation, Loan, and Access Policy6 document published in 2005 and with the standards established in 36 CFR Part 79. Prior to curation, recovered cultural material will be assigned accession numbers, re- bagged in clean 4-mil bags, labeled, sorted by provenience and placed in larger nesting bags, and nesting bags will be sorted by block, unit, and level and stored in archival banker boxes in Terracon’s secure, climate-controlled laboratory in Charleston. Once Terracon receives concurrence from SHPO indicating the Data Recovery Report and project recommendations are approved, all recovered cultural material (excluding human remains or associated grave items) will be packaged and delivered with chain of custody forms, a final copy of the Data Recovery Report, and completed site form to SCIAA for curation in perpetuity. 6 South Carolina Institute of Archaeology and Anthropology. 2005. Curation, Loan, and Access Policy. https://sc.edu/study/colleges_schools/artsandsciences/sc_institute_archeology_and_anthropology/documents/curation_loan_acces s_policy.pdf Facilities | Environmental | Geotechnical | Materials 14 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 CEMETERY ARCHAEOLOGY This section outlines the methods and processes for the archaeological recovery of human remains and burial-related cultural materials related to the use of the site as a cemetery in the late eighteenth to early nineteenth centuries. Under South Carolina (SC) Code 27-43-10, Removal of Abandoned Cemeteries , an abandoned cemetery or burial ground may be removed and relocated to a suitable location if the governing body of the county or municipality in which the cemetery is located determines “it necessary and expedient” to remove the graves and 30 days’ notice must be given to known relatives or, if there are no known relatives, 30 days’ notice of removal must be published in a local newspaper with general circulation. Terracon understands that the College of Charleston has reviewed alternatives to construction at 106 Coming Street (see Appendix A). In the event that the current project development proceeds as planned and human remains are identified during the archaeological fieldwork, the following section provides overarching procedures and details for work related to the cemetery including: 1) Public Notice and Public Consultation, 2) Methodology for Excavating and Documenting Mortuary Features, and 3) Analyses and Reporting. This document was produced as part of the overall Archaeological Work Plan for SHPO review and approval prior to the initiation of any field investigations. This section of the work plan outlines the methods and processes for excavation, documentation, and handling of human remains. As part of this project, Terracon will submit an overarching research design to the SHPO for the archaeological investigations for review and approval prior to the initiation of subsurface archaeological excavations, including burial features. This research design will include approved methodological approaches detailed in this work plan, present explicit research questions, and include a review of relevant gray literature and academic literature. This research design will help establish the context of the site, as well as define the criteria for National Register of Historic Places (NRHP) eligibility for the site within that context. Although the site has not been previously documented within the proposed project area and the level of disturbance there is currently unknown, it is possible that intact portions of the cemetery field, if they exist, could be considered eligible for NRHP under Criterion D for exhibiting the potential to yield important information associated with the largely undocumented enslaved and disenfranchised population of Charleston at the turn of the nineteenth century. Between 1794–1807, a portion of the proposed project area was established by the City of Charleston to be used as a public cemetery that was used for the burial of indigent white persons, strangers (foreigners), free people of color, and the enslaved residents of Charleston. Within a few years of discontinuing operations as a cemetery, development began within the proposed project area as multiple structures were constructed. Over the next two centuries, the site was impacted by the construction and demolition of multiple structures within the proposed project boundaries. As a result of these impacts the subsurface has been impacted down to unknown depths. Given the history of ground disturbance and multiple historical construction episodes within the project area, there is the potential for encountering displaced or disarticulated human skeletal remains. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 15 In 2023, the Advisory Council on Historic Preservation (ACHP) developed a policy statement to establish a minimum set of rules and principles to be implemented to provide consideration and protection to burial sites, human remains, and funerary objects 7. The policy statement stresses the need for coordination and consultation with communities that will be affected by development projects, particularly historically marginalized groups such the descendants of Africans and Indigenous people. Consultation should seek consensus with potential descendant communities regarding decision making (including what constitutes respectful treatment of human remains and burial sites), deferring to their preferences when feasible. Although the ACHP and SHPO prefer that burial sites be avoided and protected, if no suitable alternatives are selected/available, consultation with the descendant community is urged prior to ground disturbance, and extreme care and respect is expected when handling human remains and/or funerary objects. See Appendix F for the College of Charleston’s developing policy outline on the ACHP Policy Statement. Public Notice and Public Consultation To assist with local community engagement, the College of Charleston engaged Terracon Consultants, Inc., partnered with the Asiko Group, based in Charleston, who specializes in authentic and meaningful community engagement. The Asiko Group utilized creative communication and public outreach to work with stakeholders to help develop strategies and results that can benefit the project and community. Asiko aided the College during three public meetings (June, August and September 2025) to engage stakeholders and learn of their thoughts and anxieties in a manner receiving equitable concern. As a transition to a more direct community and descendent-led engagement, a Community Engagement Council (CEC), comprised of local volunteers, descendant community members, and other interested stakeholders, has been created to provide input on the proposed project. The CEC was created to provide advice on the respectful handling of human remains, selection of certified funeral director(s), selection of reinterment location, memorialization of the people and site, and to advise whether additional analysis, such as DNA testing or Isotope analysis, is warranted. Information about the CEC, including a roster and draft general mission statement prior to committee adoption can be found in Appendix C Since the state does not have codified protocols for the excavation and documentation of historical human burials, the methodology described in this work plan is written in general accordance with the South Carolina Standards and Guidelines for Archaeological Investigations8. With direct guidance from the CEC, methodology for respectful and ethical treatment, selection of a funeral director, reinterment location, or memorialization will develop with the project. The methodology described below reflects best practices as outlined by the 7 ACHP. 2023. Policy Statement on Burial Sites, Human Remains, and Funerary Objects. https://www.achp.gov/sites/default/files/policies/2023- 07/PolicyStatementonBurialSitesHumanRemainsandFuneraryObjects30June2023.pdf 8 South Carolina Department of Archives and History, State Historic Preservation Office, South Carolina Institute of Archaeology and Anthropology, and the Council of South Carolina Professional Archaeologists. 2000 (Updated 2024). South Carolina Standards and Guidelines for Archaeological Investigations. https://scdah.sc.gov/sites/scdah/files/Documents/Historic%20Preservation%20(SHPO)/Programs/Programs/Review%20and%20Co mpliance/Standards_Guidelines_2024.pdf Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 16 state’s guidelines for archaeological investigation, since there are no federal or state archaeological guidelines or standards guiding the relocation and documentation of human remains. It is anticipated that some aspects of the methodology below will be revised following input and feedback from the CEC. Refer to Appendix G for implementation of information sharing and feedback loop to help inform the project. Although there is not a federal nexus trigging the Section 106 process, because there is no federal agency involvement, funding, or permitting, there is a possibility of encountering historical Native American burials interred within the boundaries of the cemetery. For engagement concerning Federal Tribes and NAGPRA, see Appendix H. The College will update the public on findings throughout the work performed through multiple means including:  Email submission to coming-commons@cofc.edu, as listed on the Project 205 / Coming Street Commons website:  www.coming-street-commons.charleston.edu/get-involved  Direct engagement with members of the Community Engagement Council (CEC) or public inquiry submissions at CEC public meetings  Participation in publicly noticed Community Outreach Forums  Referenced opportunities identified or defined in the applicable Project Work Plans and Procedural Summary Matrix  Direct outreach and maintained lines of communication with Federally recognized Tribal Nations, undertaken in good faith and without imposed response deadlines It should be noted that information concerning locational data of human remains will remain redacted until the completion of the project and sensitive information (such as photographs of skeletal remains) will not be made publicly available. Public Notice If the proposed project moves forward at the current location, pursuant to SC Code 27-43- 10, the College of Charleston is required to publish a legal notice for four consecutive weeks in a newspaper of general circulation in the county to inform the public of the intent to relocate any human remains and then another four-week period is given for public comment. The public announcement portion of this project is expected to take no less than eight weeks before the proposed initiation of subsurface archaeological field investigations. This announcement should include details such as the project location, including a brief description of the current conditions of the site; a summary of the proposed project; and a means for the public to respond to or comment on the proposed relocation of the human remains. Procedures for the Discovery of Human Remains While it is possible that intact human burials associated with the former cemetery may be encountered during the investigations, within a few years of the cemetery’s closure, development began, and over the next two centuries, the site was impacted by the construction and demolition of multiple structures within the proposed project boundaries. As Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 17 a result of these impacts, there is likely significant subsurface disturbance to the former cemetery. As such, there is a higher potential for encountering displaced or disarticulated human skeletal remains potentially at or just below the ground surface that may be disturbed or exposed during preliminary ground disturbing activities. Given the potential for human remains, archaeological monitors will be onsite during all proposed subsurface disturbances associated with the current project. This includes, but is not limited to, installation of silt fencing, utility removal, and installation of a groundwater/dewatering station. See Appendix I for coordinating SWPPP for site layout. If human remains (or likely human remains) are encountered by contractors prior to or during geophysical enabling demolition on the proposed project site, ground disturbing work will be stopped within 25 meters of the remains, and the Charleston County Coroner’s Office will be contacted at the number provided below to confirm the remains are not modern. Although the Charleston County Coroner is aware of the proposed project, they will be informed of the nature of our work, given a description of the remains, and the project location address. Terracon will then inform the SHPO at the email address below within 24 hours of the unexpected discovery and will provide them with a brief update. If the remains are determined to be historic aged, they will be mapped in place, and then removed, documented, and stored per the protocols outlined in the Cemetery Archaeology section of this document. Contacts for notification of unanticipated human remains discoveries are:  Charleston County Coroner: (843) 476-4030  Primary SHPO Contact: Robert Larsen at (803) 896-6181 or rlarsen@scdah.sc.gov  Secondary SHPO Contact: John Sylvest at (803) 896-6129 or jsylvest@scdah.sc.gov During the archaeological investigations, if human remains are encountered, either as articulated/intact burials or disarticulated remains, and following SHPO consultation, the location of the remains or burial will be plotted using a total station; the remains recorded in field notes, mapping, and other documentation; and the remains would be respectfully collected, wrapped in muslin, transferred to a fully covered box, and transported to the field office/lab for documentation and temporary storage. For security reasons, no human remains will be left in the field office/lab overnight. Instead, with the consent of the project funeral director, human remains would be transported to the Terracon Charleston office for overnight storage in a locked, climate-controlled room serving as a dedicated laboratory for this project. It is expected that human remains would be turned over to a certified funeral director within 24 hours of being recorded. Excavation Methodology The following methodology outlines the process for excavating, documenting, and handling mortuary features, including single graves, mass graves, and co-mingled/scattered human remains. It is important to note that there are no state or federal guidelines governing the Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 18 archaeological removal and documentation of human remains, therefore, the methodology presented here represents a synthesis of best practices from various agencies and institutions, including the Institute of Archaeologists of Ireland 9, Institute of Field Archaeologists 10, and Oxford Archaeology 11 and follows the general methodology outlined in the South Carolina Standards and Guidelines for Archaeological Investigations, updated 2024. In accordance with SC Code 27-43-30, Supervision of Removal Work , work associated with the removal of a grave shall be done under the supervision of the state-licensed funeral director. Prior to site excavation the project funeral director is responsible for obtaining a permit from the SC Department of Public Health authorizing the exhumation and transport of human remains. This professional will be procured in combination with CEC guidance and state procurement law. Terracon will not proceed with exhumation or removal of burials, human remains, or grave goods until: 1) SHPO is given the opportunity to review geophysical data and anomalies/potential burials resulting from the proposed Stage 1 and 2 geophysical surveys; 2) this Work Plan and the forthcoming Research Design are reviewed and approved by SHPO; and 3) pursuant to state code 27-43-10, the City of Charleston approves the removal of the cemetery or burial ground and provides the College, SHPO, and SCDES-BCM a copy of the approval documentation. Human remains will not be removed during the geophysical enabling demolition. No construction is expected to take place onsite during the archaeological investigation. Field Laboratory Requirements The field laboratory will serve as a secure on-site facility for sensitive electronic equipment and temporary storage of human remains, if recovered. The proposed location for the field office is near the Vanderhorst Street entrance to the project area, subject to confirmation following the geophysical survey and ground-truthing excavations. To ensure security, the field office would have double locks on all exterior doors, including a deadbolt. Inside the laboratory, a locking cabinet or closet with keyed locks will be provided for the temporary storage of human remains and/or grave goods until they are transferred to a larger secure facility, such as Terracon’s dedicated archaeology laboratory in Charleston or a certified funeral director’s facility. With the funeral director’s approval, Terracon plans to transport recovered human remains daily to its Charleston office for documentation (e.g., measurements, photography). Storage of human remains will comply with 36 CFR 79, which requires:  Placement in a locking cabinet or closet with keyed locks inside a locked office  Fire detection and suppression systems  Climate control to maintain appropriate temperature and humidity  Protection against water damage, pests, and other environmental risks 9 Institute of Archaeologists of Ireland. 2006. Code of Conduct for the Treatment of Human Remains. First Edition– May 2006. 10 Institute of Field Archaeologists. 2004. Guidelines to the Standards for Recording Human Remains. IFA Paper No. 7. British Association for Biological Anthropology and Osteoarchaeology. 11 Oxford Archaeology. Undated. Policy Document: The Treatment of Human Remains in the Care of Oxford Archaeology. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 19 Terracon will retain human remains only until they are collected by the project’s funeral director. All transfers of cultural materials, including human remains, will be documented using chain-of-custody forms. These forms must be accurately maintained at all times, with the original retained by the Terracon field director and copies submitted alongside curated cultural materials. While the level of effort may be adjusted based on the results of the geophysical surveys, it is anticipated that the field team will include multiple human skeletal analysts (e.g., bioarchaeologist, forensic archaeologist) working within the project area, supported by a dedicated, experienced human skeletal analyst stationed in the field laboratory. While mortuary features are being exposed, documented, and removed, teams will work under large shade tents or event tents to prevent onlookers from recording or photographing human remains from above. Due to the sensitive nature of this project and out of respect for the deceased, field staff will be strictly prohibited from photographing or recording human remains and from discussing or sharing information about the project on social media. Dedicated site photographers will be selected for documentation purposes only; photographs of human remains will not be included in publications but will be included with the archived materials submitted to SCIAA for curation. The proposed project area likely exhibits a complex tapestry of subsurface cultural features, including features intersecting other features. Therefore, there can be no timeline or time constraints regarding the excavation and documentation of such a complex web of features. Because it is unlikely this document can address every possible scenario that could potentially be encountered in the proposed project area, it will be imperative to maintain bi-weekly consultation with SHPO to discuss changes to methodology if necessary. Changes will be adopted as Amendments as outlined in the Matrix and Cemetery and Commemoration Work Plan. General Grave Excavation and Documentation Outlined below under Stage 4A, if trenching is requested by SHPO, exploratory excavations within areas likely to contain graves are proposed to consist of one or more 1-x-5-meter trenches comprised of a north-south oriented column of five 1-x-1-meter units that will be tied into the site grid. These units will be excavated by arbitrary 10-cm levels within natural strata. If mortuary features (e.g., grave shafts or other evidence of burials) are encountered, excavation will temporarily stop to allow for consultation with SHPO. General site excavations are proposed to consist of 5-x-5-meter blocks tied to the site grid and excavated as 1-x-1 units by arbitrary 10-cm levels within natural strata. Field notes will be recorded on standardized test unit, burial, and block unit forms and will include unit/block designators, depth, general conditions, amount of cultural material recovered and brief descriptions of the material, and other pertinent information such as presence of and relationships between features. A Munsell chart will be used to record soil colors, and US Department of Agriculture (USDA) soil texture classi fications will be used to characterize soil textures. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 20 If mortuary features such as grave shafts are encountered, they will be excavated and screened separately from surrounding soil matrix. Once evidence of a human burial is evident, trowels will be used to excavate soil surrounding the remains (the trowel should not come in contact with bone), while wooden tools and brushes would be used to remove soil from and immediately around the remains. Grave soil will be screened through a 1/8-inch mesh screen to ensure proper collection of smaller human skeletal material and associated cultural materials. Encountered remains will be exposed, documented on a standardized burial form, photographed, and mapped. Prior to removal, osteometric analysis will be conducted in situ. During excavation of burials and/or mortuary features, shade tents or larger event tents can be used to offer some privacy from observation from above. Security cameras have been installed on site and will be monitored by 24-hour surveillance. The skeletal remains, once removed, will be wrapped in muslin, placed in multiple paper bags, carefully arranged inside a banker’s box, and immediately taken to the archaeology laboratory to initiate the analyses and chain of custody processes. Remains from a single interment or individual grave (including human skeletal remains and associated cultural remains [e.g., clothing, buttons, coffin nails and hardware]) will be given the same field specimen number to prevent commingling with other individuals. Commingled Human Remains Due to likely subsurface impacts resulting from multiple historical construction episodes, there is a possibility of encountering disturbed, scattered or commingled human remains. To document scattered and/or commingled remains associated with a mass burial, Terracon will follow guidelines outlined in the book Commingled Human Remains: Methods in Recovery, Analysis, and Identification12 for documentation. Once documented and mapped, commingled or scattered human remains can be given field specimen numbers, collected, and analyzed in the archaeology laboratory. Stacked and Mass Burials Due to the socioeconomic circumstances associated with many of the people that may be buried within the project area, and the nature of the cemetery’s history as a municipal burial ground, there is a possibility of encountering stacked burials and/or mass graves. Stacked burials are those where multiple interments are placed on top of the other, while mass graves are those that include multiple individuals generally lined up next to one another and sometimes stacked within a single grave shaft or excavation, with or without a coffin. In some instances, particularly in older community cemeteries, coffins or burials were stacked in a grave shaft to save space, sometimes with merely a thin lens of soil placed between the stacked coffins. If stacked burials are encountered, for the purposes of documentation, burials from the same shaft will receive the same burial number followed by a lowercase letter designating that individuals positioning within the shaft (e.g., the uppermost burial being designated 1a and each subsequent burial being 1b, 1c, etc.). Excavation documentation will 12 Adams, Bradley, and John Byrd. 2014. Commingled Human Remains: Methods in Recovery, Analysis, and Identification, First edition. San Diego, CA. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 21 follow the procedures outlined in the General Grave Excavation & Documentation section above, while analyses will be described below. Mass burials will be fully exposed to document the association and context between the individual interments. If there are multiple layers of remains in a mass grave pit, the layers will be removed and documented one layer at a time to preserve the relationships and circumstances between the deposits. Once documented with standardized unit notes and relevant burial forms, the remains will be photographed (to include close-up and overview shots) and mapped. Remains of the same individual will be given the same field specimen number, while commingled or scattered human remains will be given field specimen numbers, collected, and analyzed in the lab. For transport and temporary storage in the lab, skeletal remains will be wrapped in muslin, placed in individual labeled paper bags and boxes and taken immediately to the laboratory. Human remains will not be left exposed overnight. The remains will be respectfully covered, the open grave shaft or mortuary feature will be covered with plywood and a tarp, and 5- gallon buckets and/or sandbags can be used to secure the tarps and plywood in case of inclement weather. Analysis and Reporting For transport and temporary storage in the laboratory, skeletal remains will be wrapped in muslin, placed in individual, labeled paper bags (plastic bags trap moisture and should be avoided) to prevent further commingling, and taken immediately to the onsite archaeology laboratory. In the laboratory, a bioarcheologist or forensic anthropologist will conduct non- destructive analysis of the remains. Intact bones will be measured and documented, and analysis should include a minimum number of individuals (MNI) present based on the morphological and taphonomy traits. For intact individual burials, a bioarchaeologist or forensic anthropologist will use dry brushes to remove sediment from human remains and then analyze the remains to document any taphonomic or morphological traits. The analysts will attempt to create a biological profile for the individual including determining sex, age, and stature, when possible. The long bones, skull, and pelvis will be recorded through a series of measurements using an osteometric board. The goal of this analysis is to determine information about the individuals interred at the cemetery, including age, sex, and stature. Pathology (dental wear, healed fractures, evidence of disease) can provide information about the population living at that time, including nutrition and disease. Following the initial documentation, and with the funeral director’s approval, Terracon plans to transport recovered human remains daily to its Charleston office for documentation (e.g., measurements, photography) and secure temporary storage. Storage of human remains will comply with 36 CFR 79, which requires:  Placement in a locking cabinet or closet with keyed locks inside a locked office  Fire detection and suppression systems  Climate control to maintain appropriate temperature and humidity Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 22  Protection against water damage, pests, and other environmental risks Some members of the community have expressed interest in conducting DNA testing on recovered human remains. This process requires the removal and destruction of samples of bones or teeth to extract genetic material. While some community members may value the scientific and cultural insights such testing could provide, others have expressed that it amounts to desecration and strongly oppose such analysis. The CEC should determine whether DNA testing is warranted; however, this specialized analysis is not included as part of the current work plan. The College, in collaboration with the CEC, will help direct the extent of these sensitive analyses with agreed upon review and updates to SHPO. Associated cultural remains may include personal effects (such as buttons, textile fragments, or jewelry) as well as materials associated with the burial (shroud pins/rings; coffin nails, thumbscrews, or hinges; coffin grip plates, handles, and coffin wood; and potentially grave markers). Potential biological or artifact indicators of cultural affiliation will be noted, if present (e.g., grave goods, personal effects). These materials would be cleaned, cataloged, and analyzed (see Archaeological Work Plan). Artifacts associated with graves would be given the same field specimen number and would be stored and reinterred with the associated human remains. Following completion of excavations and analyses, the results of the excavations and skeletal analysis will be included in the Data Recovery Report for the archaeological investigation. Photographs of human skeletal remains will not be included in the final report but will be documented in an appendix that should be removed from the document prior to publication or distribution. The technical report will adhere to the requirements of the South Carolina Standards and Guidelines for Archaeological Investigations, updated 2024. Following review and acceptance of the final report, Terracon will provide hard copies and a digital PDF of the technical report to the SC SHPO and SCIAA. The results of the investigations may also be presented in a public information component, to be determined in consultation and collaboration with stakeholders. Terracon will retain human remains only until they are collected by the project’s funeral director. It is expected that human remains will be turned over to a certified funeral director within 24 hours following completion of the analysis. All transfers of cultural materials, including human remains, will be documented using chain-of-custody forms. These forms must be accurately maintained at all times, with the original retained by the Terracon field director and copies submitted alongside curated cultural materials. Facilities | Environmental | Geotechnical | Materials 23 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 PROPOSED STAGES OF WORK Prior to initiation of field investigations, the project area will be assigned an archaeological site trinomial and recorded with SCIAA with the understanding that the site boundaries and components may be amended following completion of the investigations. Archaeological investigations will be conducted in six proposed stages (Stage 1, 2A, 2B, 3, 4A, 4B), described below. See Appendix D for the summary matrix. Stage 1: Pre-Disturbance GPR Survey This investigation was conducted by an independent researcher who is not affiliated with or supported by Terracon. The independent researcher is associated with the College of Charleston, and Terracon understands that Stage 1, the pre-disturbance GPR survey, was completed on the existing parking surface in February 2026. SHPO is aware of this and is requesting a separate GPR plan and a report from the College for this task. Terracon is not responsible for preparing or submitting a Stage 1 work plan or any subsequent technical report for SHPO review. Any work plan or reporting associated with the Stage 1 survey is the sole responsibility of the independent researcher and the College of Charleston. Stage 2A: SWPPP Best Management Practices (BMP) Perimeter Installation Prior to any ground disturbance, and as a requirement of the CZC permit, a Stormwater Pollution Prevention Plan (SWPPP) ( Appendix I ) is required to reduce pollutants in stormwater runoff from the project area. Per the project SWPPP, controls, or best management practices (BMPs), will include the installation of perimeter fencing, tree barricades, and silt fencing. An archaeological monitor will be present during this stage of work. Perimeter Fencing: The project area will be surrounded by a six-foot tall chain construction fence with privacy screening and locking access gates that will be installed one foot from the parcel boundaries. In areas with existing structural walls or fencing, perimeter fencing will be extended to the wall or fence. In accordance with SC Code 16-11-600 (Notice of trespassing), “No Trespassing” signs will be posted in at least four (4) conspicuous locations around the site, including corners and all primary entry/exit points. Tree barricades: Tree barricades will be installed around existing monitoring wells as well as trees along the eastern side of the parcel where no ground disturbance is anticipated. Tree barricades are intended to protect trees from soil compaction, root damage, and/or trunk damage. They will be placed at the edge of the tree’s root protection zone or drop line. Tree barricades must be at least three feet in height, but for the current project they will likely include six-foot chain-link fencing used for perimeter fencing. Silt fencing: Silt fencing will be installed one foot from the perimeter fencing along the west, north, and east sides of the parcel, but not along the south side of the parcel which is bounded by the extant AT&T structure. The silt fence installation will require the excavation of a thin Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 24 shallow trench, and the placement of the silt fencing, which will be secured and held in place by metal T-posts. A mechanical trencher (such as a “Ditch Witch”) will be used to excavate a trench approximately six inches wide and six inches deep. The fencing material will be placed into the trench and secured by driven T-Posts approximately two feet deep, and finally, the trench will be back filled. Additionally, during this stage of the investigation, an arbitrary site grid will be established within a GIS framework to serve as spatial control for all subsequent archaeological fieldwork. All archaeological testing methods (e.g., shovel test pits, excavation units) and geophysical survey datasets (e.g., ground-penetrating radar, magnetometry, electrical resistance) will be georeferenced to this grid, ensuring uniform spatial control, precise provenience recording, and seamless integration of datasets. This approach will allow for consistent mapping, comparative analysis, and accurate correlation of subsurface anomalies with archaeological features throughout the duration of the project. Due to the potential for encountering cultural features or human skeletal remains, an archaeological monitor will be present during all ground disturbance work. The following summarizes the steps to be taken if human remains are encountered during archaeological monitoring (refer to Protocol for Unanticipated Discoveries): 1. Stop all ground disturbing work in the immediate vicinity. 2. Establish a 25-meter buffer around the unexpected discovery. 3. Call the Charleston County Coroner to analyze the remains. a. If they are determined to be associated with modern human remains, they will be taken by the coroner or law enforcement for investigation. b. If they are determined to be associated with historical human remains, they will be left in place or returned to the archaeological monitor. Other than by the County Coroner, human remains cannot be removed from the site unless the local governing body, the City of Charleston, approves the removal. Therefore, if the remains are returned to the archaeological monitor: 1. The monitor will document the remains using scaled photographs and detailed notes to document the remains, the incident, and the results but will not excavate or further disturb the remains. 2. Since human remains cannot be taken offsite at this stage, the remains will be left on site, reburied in place, and their location recorded and georeferenced using GPS. Installation of SWPPP BMPs is expected to require no more than one-two weeks. Accordingly, unless intact cultural features or human remains are encountered during this work, Terracon anticipates submitting a single archaeological monitoring memo to SHPO following the completion of BMP installation. Facilities | Environmental | Geotechnical | Materials 25 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Stage 2B: Geophysical Survey Enabling Demolition This stage of the work plan includes the demolition and removal of the existing YWCA structure as well as hardscape removal (e.g., asphalt pavement) from the project site to facilitate the geophysical survey. Trees on site will be cut to grade; however, no stump removal or stump grinding is proposed to limit subsurface disturbance. Existing utilities that traverse the site will remain in place but will be cut and terminated at the street for safety purposes. As a result of prior development and site disturbance, there is a higher probability of encountering cultural features, including human skeletal remains, near the ground surface. As such, archaeological monitors will be on site during all geophysical survey-enabling demolition, including pavement removal and the demolition and removal of structural remains associated with the YWCA. Terracon will notify SHPO at least 24 hours prior to fieldwork to inform them that the archaeological monitors will be present in the field and will provide the approximate proposed duration of monitoring activities. Archaeological monitors will be present during all demolition work and subsurface disturbances. Terracon proposes that monitors operate in pairs, with two monitors assigned to each mechanical excavator. If multiple excavators are in use, each will have its own team of two monitors throughout the demolition activities. Archaeological monitors will have experience and/or training in the identification of human remains. If intact archaeological deposits are encountered during monitoring, the monitors will instruct the mechanical excavator to stop work and/or relocate no fewer than 25 meters away while the feature is documented. If cultural features are encountered during this work, they will be preliminarily documented (photographed, sketch map, notes, and securing the feature from additional impacts) but not excavated. Terracon will immediately consult with SHPO upon the identification of intact cultural features and/or human remains to determine an appropriate course of action. This consultation may be initiated by telephone call or email depending on the situation. If building remains or nonmortuary cultural features are encountered, an email will be sent to update SHPO. If human remains are encountered, SHPO will be updated by telephone following the call to the county coroner (see Protocol for Unanticipated Discoveries, below). Other than by the County Coroner, human remains cannot be removed from the site unless the local governing body, the City of Charleston, approves the removal. Therefore, human remains, if encountered, will remain in place. The monitor will document the remains using scaled photographs and detailed notes to document the remains, the incident, and the results but will not excavate or further disturb the remains. Remains will be left on site, reburied in place, and their location recorded and georeferenced using GPS. Archaeological monitors will be given sufficient time to inspect exposed areas and/or record cultural materials and/or features. “Sufficient time” is variable based on feature type, size, and complexity. An archaeological monitor can generally conduct preliminary documentation activities (photography, sketch plan, notes, and securing the feature from additional impacts) Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 26 within an hour; however, if additional time is required work can continue in another portion of the site, under the supervision of a monitor, while the feature is documented to SHPO standards. Following completion of monitoring, an Archaeological Monitoring Technical Memorandum will be submitted to SHPO for review. This Technical Memorandum will highlight the general monitoring activities, including documenting the demolition with photographs and detailing any cultural features or material encountered during monitoring, as well as any SHPO consultation or communication that may have resulted during work. Terracon will provide the SHPO with a detailed description of the features and sufficient supporting documentation to aid them in rendering an NRHP eligibility determination. An appendix will be included documenting any human remains, if encountered, as well as the georeferenced location where the remains were encountered and reburied. Stage 3: Post-Removal Geophysical Survey Following the demolition of the extant YWCA structure and the removal of the asphalt paving, Terracon proposes to conduct a geophysical survey of the project area. The geophysical scope of work consists of field exploration, data processing, and reporting. Ground Penetrating Radar (GPR) Electromagnetic Induction (EMI) are proposed for this stage. The use of a second geophysical instrument (EMI) increases our ability to confidently interpret results from any given project; this is especially true concerning historical cemetery sites. The overall goal of this part of the investigation is to help determine possible number and locations of possible burials and/or concentrations of cultural features including structural footprints and/or remains. In addition, it is anticipated that the geophysical surveys may identify areas unlikely to contain buried cultural features or remains, as well as areas with non-historic period disturbance. It is anticipated that these surveys will inform the planning of subsequent archaeological investigations. The results of these surveys will provide information vital to the success of the exhumation component of this project. A description of specific instrumentation, methods, and anticipated results is presented below. Prior to the initiation of field investigations, Terracon proposes to meet with SHPO to review geophysical methodologies. Geophysical Field Exploration Methods The geophysical survey should be undertaken immediately following the removal of pavement. Prior to the survey (Stage 2a) a grid will be established in GIS and will consist of 30-x-30-m blocks. The survey transects will be conducted approximately north to south to maximize the potential for crossing unmarked graves, which are typically oriented approximately east to west. An Emlid Reach RS2+ real-time kinematic global navigation satellite system (RTK GNSS system) with a horizontal accuracy of 0.7 cm and a vertical accuracy of 1.4 cm will establish the geophysical survey baselines and permanent datums at each survey location. Subsequent archaeological investigations will be referenced to this geophysical survey grid. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 27 GPR data will be collected utilizing baselines established at each end of the survey area to ensure that transects are collected parallel to one another and to minimize gaps between transects. GPR field data collection would follow standards referenced in ASTM D6432. The GPR survey would utilize a 250 MHz antenna made by Sensors and Software (S&S), or similar, using transects spaced 25 cm apart with a trace interval of 2.5 cm. Data would be taken back to the office to be processed utilizing Geolitix, engineered by Geolitix Technologies, Inc. Data from the survey will be combined and interpreted in the GIS program QGIS, engineered by the QGIS Development Team, or similar. Data will be provided in the form of processed geophysical data, ESRI Shapefiles (Point, Line, and Polygon) in the coordinate system UTM Zone 17 North, and an interpretive map with anomaly locations and classification (Rank 1 – Rank 3), which will be accompanied by an anomaly table that includes comments and anomaly centroid positions in the UTM Zone 17 North. The EMI survey will utilize a CMD-MiniExplorer 6L electromagnetic conductivity meter, or similar. Data will also be collected in 30-x-30-m blocks, or similar, along the same axis as the GPR survey. EMI data will be collected in 25 cm transect spacing to ensure the data is sufficiently dense. EMI data will be processed in Terrasurveyor64, or similar. Data Analysis and Reporting It is expected that the results of the geophysical surveys will help inform the subsequent archaeological excavations, determine the expected number of burials and/or cultural features, and the placement of Terracon’s field infrastructure, including the placement of screening stations, a portable field office/lab trailer, a ground water-dewatering station for contingency purposes, and a geophysical enabling demolition laydown/staging area. In addition, prior soil borings and the resulting soil profiles produced may also provide useful data regarding site stratigraphy and potential depth of deposits (Appendix J). Following completion of the data analysis, Terracon will provide the SHPO with GPR amplitude depth slices and other requested data for review. In addition to the geophysical data, a Post- removal Geophysical Survey Report will be provided to SHPO summarizing the results of the geophysical survey as well as proposed alterations to the Archaeological Work Plan, if warranted. This geophysical report will outline the methodology and results of the geophysical survey, including an overview of potential anomalies. It should be noted that geophysical methods may be affected by on-site conditions beyond the control of the operator and may be considered inconclusive. Interpretation is based on a combination of known factors combined with the experience of the operator and the geophysicist evaluating the results. The geophysical results provide a level of confidence but should not be considered absolute. It is anticipated that the results of the geophysical surveys may alter proposed excavation methodologies. These changes in field methodologies will be presented as amendments to the current Work Plan document, as needed. The College will update the public on findings throughout the work performed through multiple means including:  Email submission to coming-commons@cofc.edu, as listed on the Project 205/Coming Street Commons website: www.coming-street- commons.charleston.edu/get-involved Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 28  Direct engagement with members of the Community Engagement Council (CEC) or public inquiry submissions at CEC public meetings  Participation in publicly noticed Community Outreach Forums  Referenced opportunities identified or defined in the applicable Project Work Plans and Procedural Summary Matrix (Appendix D)  Direct outreach and maintained lines of communication with Federally recognized Tribal Nations, undertaken in good faith and without imposed response deadlines In accordance with SHPO request dated September 5, 2025. It should be noted that information concerning locational data of human remains will remain redacted until the completion of the project and sensitive information (such as photographs of skeletal remains) will not be made publicly available. Terracon will not proceed with archaeological fieldwork or the exhumation of burials until: 1) SHPO is given the opportunity to review geophysical data and anomalies/potential burials resulting from the geophysical surveys and 2) the City of Charleston approves the removal of the cemetery or burial ground and provides the College, SHPO, and SCDES-BCM a copy of the approval documentation. Geophysical work will be undertaken by Alex Corkum, PhD, RPA, a geophysicist with over 17 years of experience conducting geophysical surveys on unmarked cemeteries throughout the United States and internationally (see Figures 1–4 for examples of recent work). Dr. Corkum will be assisted by Joseph Snider, a geophysicist and archaeologist with over 14 years of experience across the United States. Mr. Snider has extensive experience with both geophysical and archaeological fieldwork on cemetery sites and is skilled in managing large datasets. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 29 Figure 1 Example Unmarked Cemetery Dataset, showing 250 MHZ GPR and EMI data with Interpretation. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 30 Figure 2 Example Unmarked Cemetery Dataset Showing 250 MHz GPR and EMI data with Interpretation Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 31 Figure 3 Example of 250 MHz dataset depth-slices from unmarked cemetery. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 32 Figure 4 Representative 250 MHz GPR and EMI datasets of Historic Cultural Resources Under a Paved Parking Lot, showing Foundations, drives, garden features, and utilities. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 33 Additionally, Terracon plans to submit the first draft of a stand-alone Research Design to SHPO for review by Stage 3. This Research Design will present relevant background and will articulate the research questions, outline the proposed methodology, detail the laboratory and analytical procedures, specify curation standards and expectations, and describe the data management protocols to be employed.This research design will help establish the context of archaeological materials and/or human remains, if present, as well as define the criteria for National Register of Historic Places (NRHP) eligibility for the site within that context. Stage 4A: Archaeological Ground Truthing The goal of this Stage of work is to sample portions of the site to determine subsurface site conditions, investigate anomalies identified during the geophysical surveys, verify, if possible, the limits of burial areas and cultural features, and establish areas for site infrastructure and project access. Terracon will not proceed with archaeological fieldwork or the or removal of burials, human remains, or grave goods until: 1) SHPO has been given the opportunity to review the results of the geophysical data and anomalies/potential burials resulting from the proposed geophysical surveys. The results of this data will inform proposed excavation methodologies and may require amendments to the Archaeology Work Plan, as necessary. 2) The current Work Plan has received approval by SHPO. In addition, prior to initiation of archaeological fieldwork, Terracon will submit a Research Design for SHPO review (see Stage 3). 3) The City of Charleston approves the removal of the cemetery or burial ground and provides the College of Charleston, SHPO, and SCDES-BCM with a copy of the approval documentation. The goal of this preliminary stage of work is to verify the geophysical survey results. As such, limited trench excavations, and possibly mechanical stripping, are proposed to sample these areas (specific areas to be determined in consultation with SHPO follows completion of the geophysical survey). Following meetings with SHPO, initial archaeological ground truthing will focus on five main areas based on the results of the geophysical surveys: 1) Areas of planned SWPPP infrastructure (dewatering basin and access roads) The SWPPP and Erosion Control plans indicate that a dewatering basin will be installed in the southwest corner of the project area (due to site elevation). Two construction entrances will also be established: one along Coming Street immediately north of the dewatering basin and one along Vanderhost Street in the northeast corner of the parcel (see attached ESPs). These areas should be investigated and excavated first to facilitate compliance with SWPPP BMPs. Due to the proposed ground disturbance associated with these areas, these portions of the project site should be excavated to a depth of at least one meter or until 30 cm of culturally sterile, stratigraphically intact soil has been documented. If human remains or mortuary Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 34 features are encountered during this stage, excavation should stop to consult with SHPO to determine next steps. See proposed excavation methodologies below. 2) Areas with no subsurface features detected It is anticipated that site infrastructure will be established in areas that do not include cultural features. The geophysical results and the site design plan noting the presence of known utilities will be used to determine the best locations for the placement of the dry screening stations, field office/lab trailer, and geophysical enabling demolition laydown/staging area. If the geophysical data do not indicate open spaces or areas devoid of potential cultural features located within the project area, then the most logical locations for their placement may be excavated first to make space for the project infrastructure. Provided that doing so will not require traversing potential subsurface features, Terracon recommends using a backhoe to mechanically strip the identified areas for ground- truthing, see methodology below. 3) Areas suggestive of commingled or truncated human burials If present, mortuary features—such as grave stains, mass burials, truncated or impacted burials, and pockets of commingled remains—are expected to be systematically excavated during Stage 4B. During the preliminary Stage 4A investigations, areas identified by geophysical surveys as potentially containing truncated or otherwise disturbed burials will be examined to assess the extent of subsurface disturbance and the condition of any remains. To ground -truth these anomalies, Terracon recommends excavating a 1 -x-5-meter trench along the edge of the suspected feature. If human remains are encountered, they will be documented in situ and left undisturbed. Once a mortuary feature is confirmed and adequately recorded, the excavation unit and feature will be covered with a tarp, backfilled to a safe depth, and clearly flagged to prevent accidental disturbance prior to formal excavation. 4) Area of potential historic period structural remains. These areas may have indications of buried foundation remnants, such as piers, footing, cisterns, or other buried cultural features potentially associated with the historic period occupation of the property. The goal of this preliminary stage of work is to verify the geophysical survey results. As such, limited trench excavations are proposed to sample these areas (specific areas will be determined in consultation with SHPO following the completion of the geophysical survey). To ground-truth the buried foundation remnants, Terracon recommends excavating a one-meter-wide trench, extending up to five meters in length (longer if necessary for evaluation purposes), positioned to intersect the edges or corners of the identified anomalies. This approach will aid in determining the nature of the potential feature, the degree of subsurface disturbance, and, where feasible, its temporal affiliation. Facilities | Environmental | Geotechnical | Materials 35 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 5) Areas with no modern disturbance These are areas of the site where the geophysical survey suggests little to no modern disturbance or intrusions from utilities or other infrastructure are present. These portions of the site, if extant, have a higher probability of intact subsurface deposits and burials. Limited trench excavations in these areas may be undertaken to investigate the site’s potential for the presence of areas of intact subsurface stratigraphy. To ground-truth these areas, Terracon recommends excavating a 1-x-5-meter trench, oriented north-south, to investigate site stratigraphy and determine if intact soils are present. If human remains are encountered, they will be documented in situ and left undisturbed. Once a mortuary feature is confirmed and adequately recorded, the excavation unit and feature will be covered with a tarp, backfilled to a safe depth, and clearly flagged to prevent accidental disturbance prior to formal excavation during Stage 4B. SHPO Updates While archaeological excavation (Stages 4A and 4B) is ongoing, Terracon will submit bi-weekly updates to SHPO via email. These updates will be emailed the Monday immediately following the two-week period. If circumstances are encountered that require a significant change in site methodology, SHPO will be contacted on the telephone immediately to schedule a site visit to promptly discuss. Archaeology Ground Truthing Methodology: Trench Excavation Terracon proposes excavation of exploratory trenches (typically 1-x-5-meters) in selected portions of the site to ground truth the areas described above. In areas with no subsurface anomalies or features suggestive of human remains or graves, trenches may be excavated along a north-south or east-west orientation but would be tied to the overall site grid. Since historical burials in the region tend to be oriented east-west, a north-south oriented trench presents a higher probability of encountering a row of grave shafts. Exploratory trenches in areas thought to contain human burials units will be excavated along a north-south orientation within the existing site grid, so these areas can be tied to subsequent block excavations and resulting data could be easily incorporated. Due to the potential for encountering displaced human remains, each 1-x-5-meter trench will be excavated from the ground surface down. Units would be excavated as arbitrary 10-cm levels within natural strata. Each 1-x-1-meter unit would be identified by the northing and easting of the southwest corner. Excavation will continue until mortuary features, if present, can be clearly determined and documented; however, graves will not be excavated at this stage. If human remains or potentially intact cultural features are encountered, Terracon will follow notification protocols outlined above (Procedures for the Discovery of Human Remains). Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 36 Archaeology Ground Truthing Methodology: Mechanical Stripping Provided it does not require traversing potential subsurface features, Terracon recommends mechanical stripping in areas where the geophysical surveys did not identify subsurface features, if such areas exist. Mechanical stripping is recommended to efficiently remove overburden, enhance ground visibility, and expose subtle soil variations or cultural features that may not have been detectable through geophysical methods alone. Archaeological mechanical excavation should be conducted using a backhoe or mechanical excavator equipped with rubber tires rather than treads and fitted with a flat-bladed bucket to facilitate controlled removal of soil in 20–30 cm increments. If soil profiles remain intact and no subsurface features are identified, Terracon recommends proceeding to a minimum depth of one meter. All mechanical excavation will be directed and continuously monitored by a Terracon archaeologist. An archaeologist must be present at all times during mechanical excavation activities to ensure proper identification, documentation, and protection of any cultural materials or features encountered. All excavation activities will follow standard construction and archaeological safety procedures. A safety buffer zone will be established around the working excavator, with only essential personnel allowed inside the exclusion area. The excavator operator must always maintain clear visual contact with the archaeologist, and work will proceed at slow, controlled speed to minimize risk to personnel and sensitive deposits. Personal protective equipment (PPE), including hard hats, high-visibility vests, steel-toe boots, gloves, and eye protection, is required for all field staff within the excavation area. Work will be suspended immediately if cultural features, human remains, unstable soils, hazardous materials, or unsafe conditions are encountered, and the area will be reassessed to determine whether excavation will resume. Project Infrastructure Project infrastructure, including the field office/laboratory and screening stations, will be installed once suitable locations have been identified. Establishing these areas will require clearing through controlled excavation or mechanical stripping. After these locations have been appropriately investigated, documented, and backfilled, installation of the project infrastructure may proceed. Although infrastructure installation is anticipated to begin prior to Stage 4B, it is possible that, if suitable locations are not identified during Stage 4A, portions of the Stage 4B excavations may need to occur before project infrastructure can be installed. Field Office The field office/lab is intended to provide secure on-site storage for sensitive electronic equipment and temporary storage of human remains if recovered. The field office is proposed to be along the Vanderhorst Street entrance to the project area, pending the results of the geophysical survey. The field office/lab should include a double lock on all external doors, including a deadlock. A locking cabinet or closet with keyed locks will be kept in the lab to secure human remains and/or grave goods until they are moved to a larger, secure facility, such as the dedicated archaeology laboratory space at Terracon’s Charleston office or certified Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 37 funeral director’s facility. With the permission of the project funeral director, Terracon plans to move any recovered human remains to the Terracon Charleston office daily for further documentation (e.g., measurements, photography). The human remains would be stored in accordance with 36 CFR 79, including in a locking cabinet or closet with keyed locks located inside a locked office with keyed locks; having a fire detection and fire suppression systems, climate control to ensure appropriate temperature and humidity levels are maintained; and protection against water damage, pests, and other external elements. Terracon would only keep the human remains until they are collected by the project’s funeral director. Any transfer of cultural materials, including human remains, from one location to another would be documented with chain-of-custody forms, which must be maintained accurately and kept up to date at all times. The original chain of custody form will be retained by Terracon and submitted with curated cultural material. Screening Stations Terracon plans to establish multiple screening stations across the project area but will be limited to areas that exhibit no evidence of cultural features or burials (as determined during the ground truthing stage of field investigations). Screening stations will include a bank of portable shakers with wire mesh screens. Soil will be transported to the screening stations via 5-gallon buckets. Buckets will use a color-coded system as a visible reminder to the screeners which unit they are screening for, in addition to labeled flagging tape for each bucket indicating the block, unit, level, depth, and other pertinent provenience information. Mesh screen size will depend on what type of soil matrix is being screened. In general, a 1/4-inch wire mesh screen will be used to sift material; however, in the event that human remains are encountered, a 1/8-inch wire mesh screen will be substituted for recovery of remains or associated cultural materials. Unless site conditions dictate otherwise, Terracon plans to dry screen all soil; however, soil samples may be collected, as warranted, from select cultural features such as privies or disposal pits for later off-site water screening or flotation. Stage 4B: Archaeological Site Excavation Stage 4B would focus on the full archaeological site excavation and documentation. During this stage, Terracon would send bi-weekly updates to SHPO. SHPO staff may come to the site for monitoring purposes or for regular updates at any time. No construction is expected to take place onsite while archaeological excavations are being conducted. Prior to excavation, a 5-x-5-meter excavation grid will be established across the project area using 12-inch spike nails labeled with the northing and easting for each block. This grid will be tied to the geophysical site survey grid established during Stage 2a. The location of the block corners will be recorded with a total station or RTK GNSS system. In addition to labeling the northing and easting for all four corners of each excavation block, to make documentation more efficient in the field, each block will also be given a distinct name comprising of a letter and a number (A-1, B-3, J-10, etc.). A letter will be assigned to each row ascending from A– Z, south to north; and numbers will be assigned to columns and will ascend from west to east. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 38 Due to the potential for encountering displaced human remains, each 5-x-5-meter grid block will be excavated as 1-x-1 units in arbitrary 10-cm levels within natural strata. Each excavated 1-x-1-meter unit would be identified by the northing and easting of the southwest unit corner. Excavation will continue until the soil profile indicates a reasonable depth below disturbed subsoil and two culturally sterile, natural soil levels are encountered. Soil would be screened through a 1/4-inch mesh screen for standardized recovery of cultural material. Field notes will be recorded on standardized test unit and block unit forms and will include unit/block designators, depth, general conditions, amount of cultural material recovered and brief descriptions of the material, and other pertinent information such as presence of and relationships between features. A Munsell chart will be used to record soil colors, and US Department of Agriculture (USDA) soil texture classi fications will be used to characterize soil textures. If cultural material is encountered it will be placed into 4-mil plastic bags that will be labeled, written in black permanent marker, with pertinent project information including: field specimen (F.S.) number, project number, project name, block number, unit number, level, stratum, depth, crew initials, date, and number of bags associated with that F.S. number. Once a unit is completed, all associated field forms would be reviewed for consistency, readability, and errors, and then turned into the field office/lab with all cultural material recovered from that unit. Unit paperwork and artifact bags will be reviewed by the onsite field director for accuracy and consistency, and any errors or issues will be addressed immediately to ensure quality data recording. Features Cultural features will be hand drawn on associated Block Maps, assigned a sequential number based on the order they were recorded, and recorded with a total station or RTK GNSS system. Cultural features would be excavated by methods appropriate to their size and type and in consultation with SHPO, if warranted (see Proposed Field Methodology Overview, above). If in situ architectural or structural remains that are not associated with historical dumping episodes are encountered during fieldwork, the remains will be assigned a feature number, fully exposed within the excavation units, brushed clean, documented in standardized field notes, measured, mapped, and photographed in accordance with the procedures outlined in Documenting Archaeological Features, outlined above. Other cultural features (not including burial features) would be excavated by methods appropriate to their size and type and in consultation with SHPO, if warranted. If potential burial features are encountered under or within a feature, structural remains, or within the footprint of a historical building, the documentation and excavation of the burial will be given preference over the documentation of other non-burial features. Should any non-burial subsurface features contain preserved organic material, representative samples of these materials will be collected for future analysis (radio-carbon dating, Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 39 ethnobotanical analysis, faunal analysis). Similarly, a representative sample of preserved wood within a sealed cultural feature context may be for dendrochronological dating or other future analysis. Archaeological Analyses Following procedures outlined above, with the exception of potential human remains, cultural materials and artifacts will be processed in compliance with SCIAA’s curation guidelines. Artifacts will be washed or brushed free of soil and dried; counted, weighed, and classified; and rebagged in labeled zipper-seal archive-quality bags. Artifacts will be stored at Terracon’s archaeology laboratory temporarily until the materials are transferred to SCIAA for permanent curation. Human remains will be subject to standard osteometric analysis, which will be presented in the final report within an osteometric data chart. The goal of this analysis is to create a biological profile of each individual, to the extent feasible, including sex, age at death, and height, as well as evidence of trauma, disease, or other pathology, if present. In addition to collecting standardized osteometric data, if disarticulated remains are encountered that are not clearly associated with a singular burial, Minimum Number of Individuals (MNI) analyses will be conducted to determine the minimum number of the individuals the remains could represent. Reporting Following completion of archaeological excavation and once analyses are completed, a draft Data Recovery Report will be prepared detailing the results of the archaeological investigation. The technical report will adhere to the requirements of the South Carolina Standards and Guidelines for Archaeological Investigations, updated in 2024, and will include an updated archaeological site form. Following review and acceptance of the final report, Terracon will provide hard copies and a digital PDF of the technical report to the SC SHPO and SCIAA. The results of the investigations may also be presented in a public information component, to be determined in consultation and collaboration with stakeholders. Additionally, the resulting data will be shared with the College of Charleston to support the work of their faculty and students. Terracon hopes that researchers and scholars will utilize this information to deepen our collective understanding of the people and cultures that inhabited this land before us. Additional Monitoring Following completion of archaeological excavations, analyses, and reporting, it is recommended that archaeological monitors remain on site until all subsurface disturbance related to geophysical enabling demolition on site is completed. Terracon will notify SHPO when the proposed archaeological monitor is on site. In the event possible human skeletal remains or cultural materials related to the historic cemetery are uncovered, procedures for unanticipated discoveries (outlined above) should be followed. The onsite archaeological monitor will be responsible for initiating the “Protocol for Unanticipated Discoveries” process, Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 40 described below. If possible human skeletal remains are encountered later during construction when archaeological monitors are not onsite the project site manager will be responsible for initiating the Protocol for Unanticipated Discoveries. Following monitoring, an Archaeological Monitoring Technical Memorandum will be submitted to SHPO for review. This Technical Memorandum will highlight the general monitoring activities, as well as any SHPO consultation that may have resulted during work. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 41 PROTOCOL FOR UNANTICIPATED DISCOVERIES Although archaeological monitors will be present onsite during subsurface disturbance related to the project, the following procedures were developed to provide contractors and other on- site personnel with general referenced information for protocols to be followed in the event that cultural remains are noted. Prior to the initiation of project work, the lead monitoring archaeologist would advise on-site project contractors to be on the alert for evidence of the presence of archaeological resources and cultural materials, of how to identify these expected resources, and of the appropriate protocol in the event of apparent discovery of an archaeological resource or possible human remains. If potential intact archaeological features or subsurface artifact concentrations related to the historic period occupation of the site are encountered, soil disturbing activities in the immediate vicinity would be temporarily halted and construction crews and heavy equipment would be redirected to another portion of the site until the resource is documented and evaluated. The on-site archaeologist would assess the identity, integrity, and significance of the encountered archaeological resource in consultation with SHPO, detailed above (Documenting Archaeological Features). If potentially significant cultural features (such as intact structure foundations, privies, or other larger features) are uncovered during the geophysical enabling demolition efforts, temporary avoidance of these areas by ground- disturbing activities may be necessary pending additional SHPO coordination and/or a site visit. The area surrounding the cultural feature would be secured and marked as an avoidance area with surveyor’s flagging tape and ground stakes. It is expected that geophysical enabling demolition work would progress elsewhere on the site and that such avoidance would not cause significant project delays. The intent of archaeological monitoring is to identify and assess intact, subsurface cultural features and artifact concentrations as well as potential burials or human remains. With the exception of a representative sample of temporally or culturally diagnostic artifacts (which may be collected, as warranted, from disturbed fill or exposed ground surface), no systematic collection of unprovenienced artifacts or cultural materials from previously disturbed deposits or construction fill would occur. Similarly, analysis would be limited to artifacts and cultural materials recovered from intact feature contexts, discussed below. In the event that human remains (or possible human remains) are encountered by contractors during geophysical enabling demolition on the proposed project site, ground disturbing work will be stopped within a 25-meter perimeter of the remains, and the Charleston County Coroner’s Office will be contacted at the number provided below to confirm the remains are not modern (see Procedures for the Discovery of Human Remains , above). Although the Charleston County Coroner is aware of the proposed project, they will be informed of the nature of the work, given a description of the remains, and the project location address. The site superintendent will then contact the SHPO within 24 hours of the unexpected discovery. If the remains are determined to be historic aged, Terracon archaeologists can be mobilized to map, excavate, document, transfer the remains to the Terracon lab for detailed analysis, Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 42 and subsequent transferal to the certified funeral director once analysis is completed, per the protocols outlined above. Contacts for notification of unanticipated human remains discoveries are:  Charleston County Coroner: (843) 476-4030  Primary SHPO Contact: Robert Larsen at (803) 896-6181 or rlarsen@scdah.sc.gov  Secondary SHPO Contact: John Sylvest at (803) 896-6129 or jsylvest@scdah.sc.gov  Emergency: 911  Non Emergency CofC Police: 843.953.5609 In the event that geophysical enabling demolition proceeds without an archaeological monitor on site and any damage or subsurface impacts should occur to the site as a result of proposed geophysical enabling demolition activities, or on-site vandalism is noted, the damage must be documented in accordance with the SHPO document, Guidance for Assessing Damage to Archaeological Sites13. Failure to do so can result in felony for the destruction or desecration of human remains, which is punishable with at least one year and not more than 10 years in prison and a maximum fine of $2,000 (SC Code 16-17-600). If damage occurs during the proposed archaeological investigation, appropriate law enforcement, SCDES-BCM, and SHPO should be contacted so potential site damage can be appropriately documented. This documentation would include a letter report to be submitted to SHPO and SCIAA. 13 State Historic Preservation Office, South Carolina Department of Archives and History. 2023. Guidance for Assessing Damage to Archaeological Sites. https://scdah.sc.gov/sites/scdah/files/Documents/Historic%20Preservation%20(SHPO)/Programs/Programs/Review %20and%20Compliance/Guidance-Assesing-Damage-Archaeological-Sites.pdf Facilities | Environmental | Geotechnical | Materials 43 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 GLOSSARY OF TERMS 36 CFR 60.4: Federal regulation defining NRHP eligibility criteria. 36 CFR 79: Federal regulation governing curation of archaeological collections. Accession Number: Unique ID assigned to cataloged artifacts. Amplitude Depth Slice: GPR image showing reflections within a range of depths. Anomaly (Geophysics): A subsurface reading that differs from background soil patterns. Archaeological Materials: Physical objects, artifacts, features, or other evidence resulting from past human activity. Archaeological Monitoring Final Report: A report consolidating archaeological monitoring activities, findings, and recommendations from weekly memos. Artifact: object made or used by humans; typically greater than 50 years of age, though the definition may vary by regulatory context. Bioarchaeologist / Forensic Anthropologist / Skeletal Analyst: Specialists analyzing human skeletal remains. Block Excavation: A method using a grid of square excavation units. Burial Features: may include human skeletal remains, grave shafts, coffin remnants, or other indications of human burial locations. Chain of Custody: Documentation showing who handled materials at each stage. Clean Water Act (CWA): Federal law regulating pollutant discharges and establishing the NPDES program. Coastal Zone Consistency (CZC) certification: Review of projects in eight coastal counties to ensure consistency with the South Carolina Coastal Zone Management Program and associated enforceable policies. The review ensures a balance between development and conservation of coastal resources such as wetlands, cultural resources, state endangered/threatened species, and shellfish beds. Consultation with State Historic Preservation Office. Commingled Remains: Bones belonging to multiple individuals mixed together. Criteria Considerations (NRHP): Special rules determining eligibility for property types like cemeteries. Cultural Feature (Archaeology): Non-movable evidence of past human activity, such as a trash pit or foundation. May include Burial Features. Cultural Resources: Physical evidence of past human activity including archaeological sites, structures, landscapes, and artifacts. Culturally Sterile Soil: Soil that contains no evidence of human activity. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 44 Curation: Long-term care and preservation of artifacts and records. Department of Environmental Services (DES) / Bureau of Coastal Management (BCM): State offices that issue and manage environmental and coastal permits in South Carolina. Descendant Community: People connected by ancestry or heritage to those buried or historically present. Dewatering: Removal of groundwater from an excavation area. Diagnostic Artifacts: Artifacts whose characteristics help identify age or cultural affiliation. Disarticulated Remains: Bones no longer in anatomical order. Disinterment: The lawful removal of human remains. Electromagnetic Induction (EMI): Method measuring soil conductivity to detect buried features. Ground Penetrating Radar (GPR): Geophysical method using radar waves to detect subsurface features. Human Remains: physical remains of a deceased individual, may include bones, teeth, cremated remains, or other skeletal or soft tissue materials associated with a human body. In situ: In its original place of deposition or discovery, undisturbed. Laydown/Staging Area: Designated location for tools, materials, and equipment. Mass Burial: Burial containing multiple individuals interred in a single grave or depositional context (Mass Grave). Midden: A historical trash or refuse deposit. Minimum Number of Individuals (MNI): The smallest number of individuals represented by recovered bones. Munsell Color Chart: Standard tool for describing soil color. Muslin Wrapping: Breathable cloth used to protect human remains during transport. NAGPRA (Native American Graves Protection and Repatriation Act): Federal law governing treatment and repatriation of Native American human remains and cultural items. National Pollutant Discharge Elimination System (NPDES): A permit program that controls water pollution by regulating discharges to surface waters. National Register of Historic Places (NRHP): Official list of historically significant U.S. sites. Osteometric Board: forensic laboratory tool used to make linear measurements of skeletal long bones. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 45 Osteometry: measurement of skeletal material; the study of humans through skeletal analysis. Post-Removal Geophysical Survey Report: Final report produced after demolition/hardscape removal to refine anomaly mapping under cleaner conditions in consultation and concurrence with SHPO. Pre-Disturbance GPR Survey Report: Report documenting ground-penetrating radar methodology and results prior to any ground disturbance. Privy: A historical outhouse pit that often contains preserved artifacts. Provenience: The exact recorded location of an artifact or sample in three dimensional space. Research Design: A formal document outlining research goals, methodology, analytical approaches, and data management strategies for an archaeological investigation. Establishes historical context, theoretical framework, research questions, and comparative studies (case studies). Reinterment: Respectful reburial of human remains after study. RTK GNSS: High-precision GPS used for mapping with centimeter-level accuracy. SC Code 27-43-10 to 27-43-40 Removal of Abandoned Cemeteries: Outlines procedures for the removal of abandoned cemeteries, including notice requirements, due care, community involvement, and the responsibilities of landowners and governing bodies. SC Code 16-11-600 Notice of trespassing: Defines trespassing as entering another’s land after notice prohibiting entry has been given by the owner or tenant. Notice may be established either by posting signs in at least four conspicuous locations along the property boundary or by marking boundaries with clearly visible purple paint stripes meeting specified size, height, spacing, and visibility requirements. Such posting constitutes legally conclusive notice, and unauthorized entry thereafter is a misdemeanor punishable by a fine up to $100 or imprisonment up to 30 days. SC Code 16-11-780: Prohibits entering lands without permission to locate, disturb, remove, or attempt to remove archaeological resources; violations may result in criminal penalties. SC Code 16-17-600: South Carolina’s primary criminal statute protecting human remains, graves, cemeteries, burial vaults, and associated markers. Screening: The process of passing excavated soil through mesh to recover artifacts. Stacked Burial: interment of more than one individual in a single grave shaft; typically placing one casket or burial atop another. State Historic Preservation Office (SHPO): State office reviewing projects for potential effects on historic properties. Stratum / Strata: A soil layer formed at a particular time. Taphonomy: Post-burial processes affecting preservation of remains. Transect: A line established during survey to collect systematic data. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials 46 U.S. Environmental Protection Agency (EPA): Federal agency overseeing environmental protection and delegating permit authority to states. Unanticipated Discovery Plan (UDP): Procedures to follow when unexpected artifacts or remains are discovered. Undertaking (federal): A project involving federal funding, approval, or permits, triggering federal historic preservation review. Work Plan Amendment(s): Formal change, modification, or addition made to a Work Plan for the purpose of clarifying, updating, correcting, or improving content. An official part of the original document once adopted, the amendments are used to reflect new information, evolving circumstances, or stakeholder input while maintaining the integrity of the underlying framework of the original Work Plans. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX A: COLLEGE OF CHARLESTON MITIGATION ASSESSMENT College of Charleston Mitigation Assessment Founded in 1770, the Colle ge of Charleston sits in the he art of the Historic Charleston peninsula. The College currently owns and op erates over 190 buildings, spanning three campus locations with more than 120 of those structures classi fied as historic. As a longtime community member and steward of historic preservation, the College of Charleston is committed to the delicate balance urban universities face when managing the relationship between the institution and th e surrounding community. A critical component of that town-gown interplay is on-campus stude nt housing. To that end, the College of Charleston for the last 30 ye ars has continuously worked to provide as much affordable, on-campus student housing as possible. Howe ver, the College is only able to house approximately 3,400 students, which puts it fa r below the national av erage of universities that house more than 40% of their undergraduate populations. Creating more affordable student housing on campus will provide bene fits to both the College and the greater community. Research consistently demonstrates that university students who reside on campus tend to achieve higher academic performance and exhibit greater retention rates compared to their of-c ampus peers. Additiona lly, providing more on- campus housing eases pressures on surrounding neighborhoods. Being situated in a dense urban historic city, the College has found opportunities for development are limited: - Scarcity of raw land - Options of demolition and rebuild are limited due to the historic nature and existing lot size limitations - Acquisition of historic structures to renova te or add to for large-scale needs is often difficult to incorporate modern buildin g co de or system requirements without reduction o f usable living space The College of Charleston understands the obligation, duty, and commitment to the community to investigate alternative options that would avoid harm to the cultural resources located at 106 Coming Street an d 99 St. Philip Street. The prop erties and ventures outlined below demonstrate the College ’s efforts over the last six years to seek and find alternative viable options for large-scale residential housing that meet the campus needs and balance the economy of scale for construction. 1. 363-369 King Street a. Assemblage of 3 parcels on King between retail outlets Urban Outfitters and Williams So noma. b. Beztak Properties designed and took through BAR a residence hall project. c. New 7-story d. Beztak could not make the project work financially. i. As part of an easement process, the College was able to secure a ROFR, and when Beztak decided to not move forward with their project, the College exercised that option. e. After several months of due diligence, the College also could not make the project work financially . 2. New Residence Hall LX (Lightsey Annex) a. A new residence hall built on land currently owned by CofC on the small footprint behind Berry /Lightsey/McAlister residence hall structures. i. Site of the old Sears tire center b. New 6-story building (cu rrently zoned for 5) c. Only provided 180 beds 3. Various Alternatives on Foundation Property along Wentworth/Coming a. New construction behind the old Greek houses on Wentworth Street (97–107 Wentworth) i. Very small project, less than 10,000 square feet; did not meet the need and took current parking online. ii. Between 100 and 111 beds b. Renovation of the houses at 112 and 114 Wentworth i. VERY small project, with only a few dozen beds c. 13 Coming/8 Kirkland i. Slightly larger than the 112/114 Went worth project, but not by much 4. Mt. Pleasant Days Inn a. Explored acquisition of the old Days Inn at 261 Johnnie Dodds Blvd in Mt. Pleasant. b. The facility was owned by VTT Management and had 130 rooms. c. The site was about 2.5 acres d. The seller was not willing to work through the state process, and the College could not act quickly enough. e. There were questions about how well student housing of the peninsula would be received by students. 5. Master Lease Existing Student Housing in Charleston a. Issued an RFP in September 2021 i. Only two responses – 99 St. Philip, 61 Vandy ii. CofC moved forward with 99 St. Philip as 61 Vandy became unresponsive due to lease timeline b. Issued an RFP in April 2022 i. Warren Place lease was ending August 2023 ii. Only two responses – Warren Place, 930 NoMo iii. CofC moved forward with Warren Place as 930 NoMo was cost prohibitive and the College had existing infrastructure at Warren Place so remaining in place saved College resources c. Issued an RFP in June 2023 i. Only a few responses – 61 Vandy, 930 NoMo, 595 King-Hofler Place, 363-369 King ii. CofC moved forward with 61 Vandy as the others were far too expensive. 1. The lease rates were well above our existing housing fee structure. d. Issued an RFP in April 2024 i. Only one response – 930 NoMo ii. CofC didn’t move forward with accepting proposal as it was higher than their previous proposal and well beyond our student housing rate. 6. 200 Meeting a. Looked at acquisition of the building and parking deck at 200 Meeting Street b. 4-story, 145K heated square foot building offered by Avison Young c. Needed extensive renovation to make residential. d. The seller was not willing to work through the state process, and the College could not act quickly enough. 7. Wentworth/St. Philip Street Parking Deck a. The College does not own the land. b. City of Charleston is going to require at least the current number of parking spaces (503) return in the new development, which leaves very little space for other uses. 8. 220 King Street a. Acquisition of the former nunnery and Christian bookstore at the corner of Beaufain and King streets b. Had limited housing units already built out, but needed significant work c. Did not offer much in the way of density d. Seller moved to another buyer that could work faster than a State agency 9. Redevelopment of College Lodge site a. Initial plan was to replace facility with new residence hall b. After a feasibility study, it was determined that the footprint is not large enough to provide necessary density 10. Residence Inn on Ripley Point a. Temporary solution to housing needs b. Cons: too expensive, requires transportation support to main campus As an additional analysis of harm avoidance, the College al ong with its consultants have analyzed construction methods, design considerations, engi neering and building code, and local ordinance requirements when considerin g new construction for the site. Two main requirements below outline unavoidable ground disturbance impacts for any new construction activity:  Soils and bedrock, Cooper marl, located in the Charleston peninsula require significant structural foundations to m eet engineering and seismic zone requirements. The impact to a site’s footprint for building foundations can range from 50’-80’ below grade for piles with caps being multiple feet deep and 10’-20’ square pile caps impacting on average 5’ below grade and above the water table.  The City of Charleston's Stormwater Design Standards w ill require any new construction to provide stormwater retainag e vaults to offset new construction and impervious area runoff. In-ground vaults require ex tensive ground disturbance sitting below finished floor and above the site’s water table, likely 5’0” below site grade. Through consultant analysis and regulatory re view, it has been dete rmined that complete preservation in place (i.e., true harm avoidance) is not feasible where development of substantial scale is proposed. Structural engineering require ments, stormwater management constraints, subsurface condition s, and required building foundations would unavoidably disturb archaeological deposits and burial features. As a result, the Work Plans are framed around mitigation and stewardship, rather than avoidance. Accordingly, the project’s proposed approach emphasizes:  Careful archaeological investigation and documentation,  Respectful treatment and reinte rment of human remains where encountered, and  Development of memorialization and commemoration informed by regulatory review and community engagement. The College further notes that if it is ultimately determined that a residence hall cannot be constructed at this site, the College will no t proceed with development and the property would be sold under its existing entitlement and zoning requirements. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX B: SITE WORKER INFORMATIONAL PAMPHLET Project 205: Cultural Resource Awareness & Legal Responsibilities WHY THIS SITE MATTERS Charleston’s City Cemetery, also called the Public or Strangers Burial Ground, operated from 1794 to 1807 as the primary burial place for individuals who lacked access to church or private cemeteries, including the poor, the sick, orphans, enslaved people, free people of color, and foreign travelers. By 1807, the burial ground was declared full and closed. Shortly thereafter, the land was leased and sold for development, resulting in dense residential construction atop the cemetery. Please remember that the area you are working in is a culturally sensitive area that may contain important archaeological resources, including the remains of historic structures dating from the early 1800s, cultural features, and even unmarked burials. Protecting them is not only respectful— it is required by law. SOUTH CAROLINA LAW SC Code §16-11-600, entering property after a “No Trespassing” notice has been posted or personally communicated constitutes a misdemeanor, punishable by a fine of up to $100 and/or imprisonment for up to 30 days. SC Code § 16-11-780 makes it unlawful to knowingly enter private or posted state lands to excavate, disturb, or remove archaeological resources (material remains at least 100 years old). Violations carry escalating penalties from misdemeanor to felony charges punishable by up to $5,000 and five years’ imprisonment, along with potential equipment forfeiture and civil liability. Pursuant to SC Code §16-17-600, it is a felony to knowingly and willfully disturb, damage, desecrate, or remove human remains, burials, or associated grave markers without proper legal authority. Violations are subject to penalties of up to 10 years’ imprisonment and/or fines up to $5,000. WHAT TO LOOK OUT FOR Burials may have been impacted during historical development, and they may be displaced from the burial location. Be observant for possible bones, artifacts, or odd soil stains, particularly stains with straight lines or stains that are unnatural looking.  Possible human remains (bone fragments, teeth, organized bone layouts).  Burial features (soil stains, coffin hardware, concentrations of shell)  Cultural features (brick or stone alignments/concentrations, hearths/charred wood, postholes, refuse pits, dark stains)  Artifacts (jewelry, buttons, clothing accessories, tools, glass, ceramics, metal items, arrowheads, Native American pottery, etc.) WHAT TO DO IF YOU ENCOUNTER SOMETHING?  Stop all work in the area.  DO NOT touch or move anything!  Notify the archaeological monitor immediately.  Await archaeological evaluation and next steps. If human remains are encountered, an on-site archaeologist will initiate the Unexpected Discoveries process, which involves contacting the County Coroner to determine if the remains are archaeological or not. Work cannot continue until the archaeological monitor gives the “all clear”. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX C: COMMUNITY ENGAGEMENT COUNCIL Subject: Subject: Subject: Subject:Selection to the Community Engagement Council (College of Charleston) Date: Date: Date: Date: From: From: From: From: To: To: To: To: Andrew T. Hsu BCC: BCC: BCC: BCC:Berry, Mark E Dear XXXXX, Thank you for your interest to serve on the Community Engagement Council for the College of Charleston’s 106 Coming Street Project. The College of Charleston is committed to treating the history of this site with the utmost dignity. Your background, perspective and engagement with the community all contribute to your strength as a council member. As a member of the Community Engagement Council, you will help guide the College through this project in its solemn responsibility to communicate and interact effectively with the community. The Community Engagement Council will play a central role in advising the College’s efforts in honoring and memorializing both the former potter’s field and the former YWCA, providing insight and feedback on potential events, interpretative approaches to the footprint of the construction site and commemoration efforts associated with this project. Your perspective will be invaluable as the College and City of Charleston seek to engage with the community in an open, respectful and collaborative manner. The Council will include representatives from the City of Charleston, members of the College community, local religious leaders, community voices, preservation stakeholders, consultants and advisors from all backgrounds. This broad representation is essential to ensure that our work reflects a wide range of perspectives and honors the legacy of the site with respect and integrity. The Council will meet regularly (monthly), and service will possibly extend from 6 to 12 months. You are invited to an introductory meet and greet (followed by a reception) on W ednesday, November 12 from 6:00 to 7:30 p.m. in the College’s Randolph Hall (66 George Street). On behalf of the College of Charleston, thank you for your willingness to serve on the Community Engagement Council. Your voice and leadership will help ensure the work on the 106 Coming Street Project is carried out with care, respect, transparency and a shared commitment to “respecting – the past, place and people.” We look forward to your involvement and meaningful work ahead. Sincerely, Andrew Andrew T. Hsu, Ph.D. President Liaison Consultants Advisors Harlan Greene Jim Newhard Walter B. Brown Joshua Shumak Dr. Courtney Howard, VP of Community Engagement Dr. Tonya Matthews IAAM Arthur McFarland Retired municipal judge Lisa Jones Jalen Evans Stephen Vale Cofer- Shabica Abigail Dairaghi Michael Allen National Parks Service Demetria Noisette Clemons Trustee Emerita Jerome Harris Zoe Barber Patricia Ploehn Julie Ann Bowling Omar Muhammad Protect & Respect the Bodies Madison Lee Sharon Ramirez Dr. Millicent Brown Eric Manning Dr. Shawn Gathers Norm Dickerson James Njonjo Luqman Rasheed COMMUNITY ENGAGEMENT COUNCIL Facilitators Joanna Gilmore - Anson Street African Burial Ground LaSheia Oubre - Anson Street African Burial Ground Clay Middleton Community Members 1 Community Engagement Council Mission, Objectives, Goals and Values During the Community Engagement Council (CEC) Meeting on November 12, 2025, Council members shared their ideas for the mission, objectives, goals, and values for the Council. Using these ideas, the following definitions and priorities were created. See the Appendix (below) for the full details of Council members' responses or this spreadsheet. Mission The mission of the Community Engagement Council is to advise the College of Charleston on the proposed Coming Street residential project to ensure that the people buried there are cared for in a way that respects, honors, and celebrates their humanity, cultures, and lives. Guided by sensitivity, respect, and humility, the Council provides an open and transparent forum for community voices, working to center narratives and histories that have been hidden or buried. Together, we strive to use this project as an opportunity to right harms of the past and avoid future harm by creating honorable, humanity-centered pathways of stewardship, repair, and partnership between the College, collective descendants, and the broader Charleston community. Through truth-telling, accountability, and collaboration, we seek to model a process that leads toward conciliation, justice, and healing, ensuring that known cemeteries on College of Charleston property are not disturbed without descendant approval. Objectives 1. Lead with honesty, empathy, and humility, ensuring that all perspectives are heard and respected. 2. Model a new standard of community collaboration, grounded in transparency and trust. 2 3. Provide open forums for dialogue and feedback, creating visible, tangible outcomes that reflect community priorities. 4. Advise on research, preservation, and commemorative stewardship of the burial ground, the 19th-20th-century community, YWCA, and any associated artifacts and materials, ensuring that descendant and community values guide all actions. 5. Advise whether in-situ preservation would be the most reverent and ethical approach to honor and memorialize the deceased 6. Document and share the full history of the public burial ground and historical community. 7. Encourage education, learning, and truth-telling, both within the College and across Charleston, as part of a broader process of healing and repair. Goals 1. Honor and memorialize the ancestors with dignity and care, restoring their personhood and sacred presence. 2. Ensure truth and transparency in all communications and decision-making about the burial ground. 3. Foster trust and lasting collaboration between the College, descendant community, and Charleston residents. 4. Create meaningful spaces for remembrance and reflection through memorial design, ceremony and interpretation of the full history of the public burial ground and historical community. 5. Support education and dialogue that deepen understanding of African, Indigenous, and other cultural traditions connected to the public burial ground and historical community. 6. Direct involvement in developing plans for the study of the remains and cultural artifacts identified at the site if excavation is deemed unavoidable. 7. Seek solutions that prioritize respect for the burial ground’s sacred nature while considering community and institutional needs. 8. (Stretch Goal) Inspire connected conversations citywide that protect other sacred sites and advance sustainable community engagement. Value Statements ● We honor and protect the dignity of both the living and the dead. ● We listen with empathy, learn with humility, and lead with love and grace. ● We commit to honesty, transparency, and working at the speed of trust. ● We collaborate across differences, share decisions, and communicate openly. ● We make space for all ideas, seek common ground, and nurture creativity and openness. ● We are mindful of our voice, posture, and energy as we work together to acknowledge past harms and build a more respectful, caring future. 3 Appendix: Summary of CEC Meeting Feedback on the Mission Council members consistently emphasized that the mission of the Community Engagement Council should be rooted in respect, transparency, truth-telling, and repair. 1. Honoring and Preserving the Sacred Site Councillors emphasized the sacred responsibility to care for the burial ground and to honor the humanity of those interred there. “Honor those buried and preserve the grounds with community support.” “Ensure the College of Charleston Coming Street site respects, honors, and celebrates the people who are interred there by honoring their humanity, culture, and lives.” 2. Centering Community and Descendant Voices There was strong agreement that this process must not be college-driven but community-led, and that the Council should create a model of shared decision-making. “Clarify publicly and widely the process of collaboration being attempted… not a college-driven task.” “Provide an open and transparent forum that leads to a deeper understanding of the entire community’s needs.” “A community-based collaborative organization to bring about a nationally recognized process of engagement.” 3. Truth-Telling and Accountability Members called for open acknowledgment of past wrongs, especially regarding how the property was acquired, and for clear systems to prevent similar harm in the future. “A thorough and transparent report that clearly lays out all decisions, and the decision makers involved… and preventative measures that will stop something like this from ever happening again.” “Centering narratives and histories that this College and city has hidden and buried.” 4 4. Healing, Stewardship, and Repair The Council’s work was described as a moral and relational endeavor - one that should model conciliation, justice, and care for future generations. “To create honorable, humanity-centered stewardship, repair, and partnership pathways for CofC and Charleston communities, modern and descendant.” “Resolve this issue with knowledge of the past and create pathways others could follow in future.” “Bring forth processes that lead towards conciliation, justice, and truth- telling.” Summary of CEC Feedback on Objectives Objectives describe the specific actions or intentions that move us toward our mission. Council members envisioned the Council as a model for ethical collaboration and public accountability, one that leads with empathy, listens deeply, and acts with integrity: 1. Acting with Honesty, Empathy, and Respect Councillors repeatedly emphasized how the Council should work. They suggested that we lead with humanity, listening to all perspectives, and honoring the cultural and spiritual traditions of those buried at the site. “To lead with honesty and empathy.” “Listen to all perspectives.” “Intentionally honor, engage, and include the multitude of cultural and religious traditions of those who are buried there.” “Honoring those lives who were not considered and not valued with intentional purpose.” These statements reflect the group’s shared desire to make integrity and care foundational to every action the Council takes. 2. Building a Model of Transparent, Inclusive Collaboration 5 Members described a vision for the Council as an example of how institutions and communities can work together more equitably - not just in Charleston, but nationally. “To help set a new standard of community collaboration within Charleston and this country.” “Ideas brought forth by this council are implemented in meaningful, tangible ways.” “To produce recommendations for the ComMons project to be publicly acted on by the College of Charleston administration and trustees.” “Offer a space for students and locals to ask questions or offer feedback.” These objectives capture both the process (open collaboration) and the product (visible, public outcomes) that participants want the Council to embody. 3. Research, Documentation, and Commemoration A third objective theme centers on the Council’s role in helping shape the research, stewardship, and commemoration of the site, ensuring that actions are informed, respectful, and community-guided. “To map out a plan for commemorative stewardship of the site and any remains or artifacts discovered.” “To consult and advise on all aspects of the historical, archaeological, and interpretive elements for all periods represented.” “To research, document, and preserve the stories of those who were marginalized.” “To seek opportunities for education and learning about the people who were interred there.” These reflect practical objectives within the Council’s advisory scope - to guide, review, and advise on key elements of interpretation, research, and memorialization. 4. Truth-Telling and Learning Participants urged the Council to document and share the full history of the site. “Understand in detail how we arrived at this place.” “We all learn from this experience so that it does not repeat itself.” “The College takes this as an opportunity to learn more about 106 Coming Street and other sites on campus where community collaboration may not have been present.” 6 “Find a solution that prevents erasure, that is community and descendant led and demonstrates the importance of our city's sacred sites.” This reflects a commitment to learning through accountability, through this process we can honor the past while guiding future action. Summary of CEC Feedback on Goals Goals describe the broader outcomes that the Council hopes to achieve over time. They express the council members’ long-term vision and values. While objectives are the concrete steps we can take now, goals point toward the future we want to create together. 1. Honoring and Memorializing the Ancestors The strongest theme was the desire to honor those buried at 106 Coming Street through memorials, rituals, and remembrance that restore dignity and personhood. “Honor and memorialize the ancestors who perished.” “To protect, respect and honor those resting under 106 Coming.” “To restore personhood to the ancestors.” “To create a space that is respectful of those interred at the site.” 2. Truth, Transparency, and Accountability Members called for honesty from the College and the city about what happened, how decisions are made, and how information is shared. “Transparency – honesty from CofC about this project, why? when? how?” “All pending government oversight approval are made public.” “To have the city recognize its responsibility.” 3. Shared Decision-Making and Collaboration Participants emphasized collaboration between the College, community, and descendants in all decisions that affect the site. 7 “To create a process for shared decision-making.” “Collaboration within our communities.” “To work together to use this project as an opportunity to right the harms of the past.” 4. Learning and Education Many saw the burial ground as a place of ongoing learning, where history, faith, and cultural traditions can be studied and taught. “Learn more about the past.” “Studies of African/Indigenous customs.” “Proper community understanding of the Islamic religion and our way of life.” “To develop and create meaningful dialogue.” 5. Commemoration and Place-Making Participants spoke of creating public spaces that both honor the ancestors and serve as places for reflection, healing, and community gathering. “Create a proper public memorial to the persons buried at 106 Coming.” “To appropriately and adequately memorialize the burial site and distinguish between the purpose of its memorial vs. the YWCA.” 6. Balancing Housing and Sacred Ground Several members acknowledged the tension between the College’s housing needs and the sacred nature of the burial ground, calling for solutions that respect both. “Create a strategy that addresses housing needs, the sacred nature of the site, and community needs.” “Find a way to honor and respect those buried while helping meet housing needs.” “A shift away from the need for housing towards rigorous and contemplative study.” 8 Summary of CEC Feedback on Values Values express who we are and how we choose to work together. They guide our behavior, shape our relationships, and ground our decisions in respect, care, and accountability. Here’s a brief summary of the Anson Street African Burial Ground Team Ethos: Our ethos begins with humility and honesty. We recognize our different positions and power, and we work to center the voices of those who have been silenced or marginalized. We believe that descendant communities should guide decisions about ancestral remains, sacred places, and cultural heritage. We commit to building relationships based on trust, respect, and mutual care, staying mindful of who benefits from this work and striving always to increase those benefits. Our work should be rigorous and responsible, but also human - grounded in dignity, empathy, and integrity. And finally, we try to act in ways that are socially, culturally, and economically sustainable, supporting local communities, especially Black-owned businesses and organizations. Building on the values established by the ASABG team, the Council reaffirms the following principles. These principles remind us that the process of this work is as important as the outcomes - honoring “this is a process not a moment.”. 1. Respect for Lived Experience and Human Dignity Council members affirmed that every person’s story and experience matter and that honoring both the living and the dead must be central to this work. “We do not argue with lived experiences.” “We work to honor, protect, and nurture the dignity of the living and the dead.” “Honor human dignity.” 2. Listening, Learning, and Grace Listening with empathy and humility was seen as the foundation for trust and understanding. Members also emphasized granting grace - to colleagues, to those with opposing views, and to themselves. 9 “Prioritize listening and learning.” “Listen to concerns from every angle with the intention of understanding.” “We grant grace to our colleagues, to our contradictors, and to ourselves.” “To listen, to learn, and to lead with love.” 3. Trust, Transparency, and Honesty Transparency and honesty were identified as essential for building and maintaining community trust. “Work at the speed of trust.” “Open data.” 4. Collaboration and Shared Decision-Making Members highlighted collaboration across differences, within the Council, with the College, and with other partners, and emphasized shared leadership and open communication. “Shared decision-making.” “Work across our differences.” “Collaboration and communication with university and contractors, state and local agencies.” “Building consensus when possible.” 5. Creativity, Openness, and Common Ground Creativity, flexibility, and the willingness to find common ground were seen as vital to sustaining this work over time. “Being creative and open-minded.” “Make space for all ideas.” “Where there are differences, try to find common ground.” 6. Mindfulness and Care in Process Participants noted the importance of being mindful of tone, energy, and approach in every interaction. 10 “We are mindful of voice, posture, and energy—our own and our neighbor’s.” “Acknowledge past harms.” “Work at the speed of trust.” Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX D: PROCEDURAL SUMMARY MATRIX AND LEGEND Reference Work Plan & SWPPP Purpose Predecessor Successor Stakeholders Deliverables / Reporting Work Stop Required for SHPO Notes & Dependencies SCDES-BCM/SHPO YWCA CEC SCDES-BCM/SHPO CEC SCDES-BCM/SHPO CEC SCDES-BCM/SHPO CEC SCDES-BCM/SHPO CEC SCDES-BCM/SHPO CEC SCDES-BCM/SHPO CEC Revision 5/20/2026 PROJECT 205 - PROCEDURAL SUMMARY MATRIX -Ground-truth anomalies identified from post-removal geophysical survey findings in consultation with SHPO and SWPPP BMP remaining features to refine limits of burial areas/features. -Refine limits of burial areas/features. -Predetermined areas for initial ground-truthing to include (1) no/minor disturbance (higher chance of intact burials), (2) Structure, (3) Utility Pathway, (4) Stacked/mass/comingled burial, (5) Area with no discernable subsurface features, (6) SWPPP remaining BMPs (dewatering basin and construction drives). -Methodology to vary based on feature. Archaeology - Site Excavation4.B -Bi-weekly Excavation Updates to SHPO No Amendments to Work Plan methodology and Research Design will be on-going as needed in consultation with SHPO. -Maintain security and sensitive media protocols. -Ensure SHPO is notified when monitors are in the field and in the event of unanticipated discoveries. -Any human remains or associated grave goods to be documented, covered in place, and protected until further excavation staging (4.a or 4.b). Not to leave site. None -Work Plans resubmitted with concurrence from SHPO, based off review comments #3. -LDP Permit -CZC Certification -MS4 -NPDES -Funeral Director Engagement -Stage 2.A -Stage 3 -Research Design -Funeral Director Engagement -Stage 2.B -Commemoration Work Plan (3) -Weekly Archaeological Monitoring Technical Memorandums -Archaeological Monitoring Final Report (to include Stage 2.B) -Raw data generated by the GPR -SWPPP and Site Security Plan No Notify SHPO if Construction stop work is required for consultation with Coroner (City of Charleston Ordinance Sec. 7.5- 4). See work plan concerning 25 meters 'no work' clearance. (1)Post-removal Geophysical Survey Report (2)Research Design (3) Archaeology Work Plan Amendments Yes Stoppage after Stage 3 for results review and concurrence on any methodology amendments. Required Research Design Approval. 30 Day Review 30 Day Public Notice and City of Charleston City Council request for removal of cemetery (SC Code 27-43-10 to 27-43-40) ruling provided to all regulatory agencies for confirmation of compliance required prior to archaeology. -Stage 3 -Commemoration Work Plan (3) -Bi-Annual YWCA Update Memorandum -Measured Drawings accepted by SHPO prior to demolition. Yes Measured drawings to be approved prior to demolition. 15 Day Review -Weekly Archaeological Monitoring Technical Memorandums -Archaeological Monitoring Final Report (with restrictions on imagery of human remains if uncovered). Yes Review of Final Monitoring Report for consultation for Geophysical methodology. Notify SHPO if Construction stop work is required for consultation with Coroner (City of Charleston Ordinance Sec. 7.5- 4). 30 Day Review -Maintain security and sensitive-media protocols. -Ensure SHPO is notified when monitors are in the field and in the event of unanticipated discoveries. -Any human remains or associated grave goods to be documented, covered in place, and protected until further excavation staging (4.a or 4.b). Not to leave site. -Pre-Disturbance GPR Survey Report with GPR results and implications for subsequent stages. Yes Stoppage after Stage 1 for review and methodology adjustments. 30 Day Review -Consultation with SHPO/ SCDES-BCM to review results and adjust methods if needed. Submitted as an Amendment to associated Work Plan. -Commemoration Work Plan (3) -Consultation for concurrence with SHPO/SCDES-BCM on post-removal Geophysical Survey results and site demolition archaeological monitoring results. -Research Design Approved -Amendments to Work Plan (2) based on Geophysical Report findings -30 Day Public Notice and City of CHS City Council request for removal of cemetery. -Commemoration Work Plan (3) -Stage 2.B -Pre-Geophysical meeting with SHPO None -Demolition -Commemoration Work Plan (3) Identify site complexity and features prior to any ground disturbance using GPR. -Post-removal Geophysical Survey -GPR, Electromagnetic Induction, and RTK GNSS mapping survey and photogrammetry. -Results may alter Work Plan (2) methodologies as amendments. -Submittal of Research Design 0 YWCA Mitigation Documentation 2.A SWPPP Best Management Practices (BMPs) Perimeter Installation 3 Post-Removal Geophysical Survey 2.B Geophysical Enabling Demolition 1 Pre-Disturbance GPR Survey Re-survey after YWCA demolition and hardscape removal. SWPPP & (2) Archaeology Work Plan (Archaeological Monitoring) Clearing of onsite surface geophysics obstructions. Stage (1) Professional Examination Mitigation of YWCA loss to include measured drawings, photography, compiled historic report, and select material salvage. SWPPP & (2) Archaeology Work Plan (Archaeological Monitoring) Prepare the site for anticipated demolition and excavation. SWPPP Compliance prior to land disturbance (LDP) activities. SWPPP & (2) Archaeology Work Plan (Archaeological Monitoring) 4.A Archaeology - Ground-Truthing SWPPP & (2) Archaeology and Cemetery Work Plan Maintain security and sensitive-media protocols. -Stage 4.A -Continued Funeral Director Engagement -Commemoration Work Plan (3) -Artifact analysis, curation, and reporting (on-going throughout). -Bi-weekly Excavation Updates to SHPO -Data Recovery Report Submittal to SHPO following completion of excavation and analysis. -Artifact(s) submission to SCIAA -Commemoration Work Plan (3) No Archaeological Data Recovery Report Submittal requires final SHPO acceptance. Maintain security and sensitive-media protocols. -Continued Funeral Director Engagement -Commemoration Work Plan (3) -Artifact analysis, curation, and reporting (on-going throughout). -Full archaeological excavation and burial recovery. -Excavate 5×5 m blocks (~10 cm natural strata), allow method flexibility (e.g., trenching) for commingled/disarticulated contexts, when appropriate in consultation with SHPO through weekly technical memos. -Collect standardized osteometry data and calculate MNI -Document non-burial features and gather representative samples as appropriate. -Artifact analysis, curation, and reporting SWPPP & (2) Archaeology and Cemetery Work Plan Key Activities & Methods -Measured Drawings -Photography -Compiled/repackaged historic report -Select Material Salvage -Commemoration (BAR and PUD) -Independent (non-Terracon) GPR -Prepare PreDisturbance GPR Report. -Create site grid in GIS to which all subsequent archaeological and geophysical activities will be georeferenced -Install SWPPP BMPs: perimeter fencing, silt fencing, tree/monitoring well protection, and inlet protections. -Establish site security and signage -Archaeological Monitoring -Applicable Work Plan protocol, Permits, Laws, and SC Codes apply throughout project work. -Continuous archaeological monitoring during all site activities. -Includes site utility termination (at street), asphalt/concrete/gravel overlay removal, YWCA demolition including foundation, tree and utility pole cut to grade only. -Applicable Work Plan protocol, Permits, Laws, and SC Codes apply throughout project work. (2) Archaeology Work Plan (Archaeological Monitoring) Work Plan Reports/Deliverables/Engagement Definition YWCA - Measured Drawings Architectural measured drawings documenting the YWCA; must be accepted by SHPO prior to demolition. YWCA - Photography (Mitigation Set) Photographic documentation of the YWCA used as part of mitigation for loss of the structure. YWCA - Compiled/Repackaged Historic Report A consolidated historic report assembled as part of the YWCA mitigation deliverables. YWCA - Select Material Salvage Plan/Record Identification and salvage of selected materials for mitigation/commemoration purposes. Bi-Annual YWCA Update Memorandum Memorandum of YWCA commemoration planning, engagement, and general updates to be sent to SHPO. Pre-Disturbance GPR Survey Report Report documenting ground-penetrating radar methodology and results prior to any ground disturbance. Research Design Formal research design submitted/approved post-geophysical work and concurrently with post-removal geophysical survey report to establish historical context, theoretical framework, research questions, and comparative studies (case studies). Work Plan Amendment(s) Formal change, modification, or addition made to any Work Plan for the purpose of clarifying, updating, correcting, or improving content. An official part of the original document once adopted and is used to reflect new information, evolving circumstances, or stakeholder input while maintaining the integrity of the underlying framework of the original Work Plans. For notification and ratification for approved Amendments methodology see Archaeological Work Plan or Cemetery and Commemoration Work Plan. Weekly Archaeological Monitoring Technical Memorandums Weekly technical memos issued during monitored activities (e.g., SWPPP BMPs, demolition, utility terminations), documenting findings and status with field updates (restrictions on imagery of human remains if encountered). Archaeological Monitoring Final Report Final report consolidating weekly monitoring memo results and associated conclusions to inform successor activities and methodolo gies. Post-Removal Geophysical Survey Report Final report produced after demolition/hardscape removal to refine anomaly mapping under cleaner conditions in consultation and concurrence with SHPO. Bi-Weekly Excavation Updates to SHPO Updates due every two weeks and must reflect the sequential two-week period just completed sent to SHPO during ground-truthing and excavation phases; used to consult on methodological adjustments and may result in work plan amendments. Archaeological Data Recovery Report Report submitted after completion of excavation and analysis; final SHPO acceptance required. Monthly Informational Exchange Packet A recurring submission from the College of Charleston to SHPO providing ongoing project updates and information sharing, including summaries of Community Engagement Council (CEC) discussions, stakeholder input, and project developments. The Exchange Packet supports transparency and keeps SHPO apprised of engagement outcomes and evolving project conditions, while formal recommendations are transmitted separately through Work Plan amendments submitted by the College for review, comment, and a pproval. Permits / Laws Definition SCDES-BCM: Coastal Zone Consistency Certification (CZC) Review of projects in eight coastal counties to ensure consistency with the South Carolina Coastal Zone Management Program and associated enforceable policies. The review ensures balance of development and conservation of coastal resources such as wetlands, cultural resources, state endangered/threatened species, and shellfish beds. Consultation with State Historic Preservation Office (SHPO) . SCDES-BOW: National Pollutant Discharge Elimination System (NPDES) Created by Section 402 of the 1972 Federal Clean Water Act. In 1975, the Bureau of Water received authority from the Environmental Protection Act (EPA) to administer the NPDES Permit Program in SC. The Bureau is responsible for the permitting, compliance, monitoring, and enforcement activities of the program. Municipal Separate Storm Sewer System (MS4) A system of conveyances that include, but are not limited to, catch basins, curbs, gutters, ditches, man-made channels, pipes, tunnels, and/or storm drains that discharge into Waters of the State. For these conveyances or system of conveyances to be recognized as an MS4, a state, city, town, village, or other public entity must own them. Designed to reduce the amount of sediment and other pollutants entering state waters from stormwater systems. Entities regulated by MS4 permits must develop a stormwater pollution prevention program and adopt best practices. Issued by the City of Charleston. City of Charleston: Land Disturbance Permit (LDP) A required authorization for development projects disturbing 0.5 acres or more, ensuring compliance with Coastal Zone Consistency (CZC) rules, NPDES Construction General Permit requirements, and the City’s MS4 stormwater regulations. The LDP verifies that site design, grading, stormwater controls, and construction practices meet all regulatory standards for protecting waterways, natural resources, and downstream properties. SC Code 27-43-10 to 27-43-40 Removal of Abandoned Cemeteries Outlines procedures for the removal of abandoned cemeteries, including notice requirements, due care, community involvement, and the responsibilities of landowners and governing bodies. City of Charleston Ordinance Sec. 7.5-4. Establishes the City’s local rules for the protection of graves and burial sites, including during ground disturbing activities. S.C. Code of Laws Section 16-17-600 South Carolina’s primary criminal statute protecting human remains, graves, cemeteries, burial vaults, and associated markers. PROJECT 205 - PROCEDURAL SUMMARY LEGEND PROJECT 205 - PROCEDURAL SUMMARY LEGEND Stakeholders / Feedback Sources / Other Definition College of Charleston The institutional owner and project sponsor for Project 205/Coming Street Commons. The College of Charleston is responsible for project planning, coordination with regulatory agencies, consultant oversight, public communication, and implementation of approved Work Plans. As steward of the site, the College facilitates information sharing and engagement with the Community Engagement Council (CEC), Tribal Nations, communities of care, and the broader public, while retaining decision-making responsibility in accordance with regulatory requirements, institutional policies, and applicable laws. Terracon Consultants Inc. The College of Charleston’s archaeological and cultural resources consultant for Project 205/Coming Street Commons. Terracon is responsible for conducting archaeological investigations, preparing archaeological work plans and technical reports, coordinating compliance with applicable state standards and guidelines, and supporting consultation with regulatory agencies. Terracon assists the College in documenting site history, subsurface conditions, and cultural resources, including burial features, and in implementing approved methodologies for identification, documentation, and treatment consistent with South Carolina archaeological standards and nationally recognized best practices. Community Engagement Council (CEC) Established by the College of Charleston through a public, self-nomination process, the Community Engagement Council (CEC) serves in an advisory capacity to inform the ethical and community-centered dimensions of the project as a key stakeholder group. The CEC’s role includes: (1) providing recommendations for SHPO consideration, (2) guiding ethical and culturally informed archaeological practice, (3) advising on culturally and spiritually appropriate care and treatment protocols, and (4) shaping memorialization and interpretive approaches. Information sharing and feedback structure can be found on the Project Information and Feedback Loop. Timeframes and specific dates for benchmarks and findings will vary throughout the project. Updates will be shared monthly in concurrence with CEC meetings as they evolve. YWCA As the prior owner and long-time steward of a portion of the proposed project site, the YWCA of Greater Charleston is a key stakeholder with respect to the memorialization and commemoration of the former YWCA building and the culturally significant people, events, and activities associated with the site. SCDES-BCM/SHPO State consulting and regulatory authorities concerning Coastal Zone Consistency Certification and Conditions. Federal Tribes Sovereign Tribal Nations recognized by the United States that may have historical or cultural connections to the project area. For Project 205, the College of Charleston has reached out to Federal Tribes to share information and invite input regarding culturally appropriate procedures should Indigenous remains or related materials be encountered during project activities. Public Members of the general community who have an interest in Project 205 or its outcomes but do not necessarily assert a direct ancestral, cultural, or historical affiliation with the site. The Public may include local residents, advocates, scholars, students, and other interested individuals. Public participation occurs through information sharing, Community Outreach Forums, CEC meetings, the project website, and other opportunities for comment and inquiry, and helps ensure transparency and broad awareness of the project. Descendant Community Individuals or groups who identify a genealogical, ancestral, or cultural connection to people buried at or historically associated with the site. For Project 205, no lineal descendants have been formally identified through archival research to date; however, the College acknowledges and welcomes engagement from individuals or communities who self-identify ancestral or historical ties and seeks to ensure their perspectives are respectfully considered. Community participation and engagement occurs through information sharing, Community Outreach Forums, CEC Meetings, the project website, and other opportunities for comment and inquiry, and helps ensure transparency and broad awareness of the project. Community of Care Individuals or groups who demonstrate a sustained interest in the respectful treatment, stewardship, and commemoration of the site based on cultural, historical, spiritual, ethical, or community-based connections, rather than documented genealogical descent. For Project 205, Communities of Care may include historians, faith leaders, advocacy organizations, educators, and community members who engage through the Community Engagement Council (CEC), public forums, and other outreach mechanisms to help inform culturally sensitive practices and memorialization. Coming-street-commons.charleston.edu Project website established by the College of Charleston as a platform for information sharing, community questions and input, and transparency throughout the project. Community Outreach Forums Publicly noticed events hosted by the College of Charleston to share Project 205 updates at key project benchmarks and SHPO-defined work stops. These forums are designed to provide transparent updates on project status, findings, and consultation and engagement through presentations and open discussions by the College, its consultants, and the broader community and feedback sources. Community Outreach Forums also provide space for the Community Engagement Council (CEC) or facilitators to share ongoing discussions and developing recommendations. The forums are intended to gather broader public and descendant-community input, facilitate questions and dialogue, and support the CEC’s advisory role without establishing a separate descendant advisory body. The frequency and format of forums may evolve based on project progress and CEC input. Project Information and Feedback Loop The structured process through which Project 205 information, documentation, and regulatory reviews are communicated among the College of Charleston, consulting agencies, the Community Engagement Council (CEC), Tribal Nations, and the public. The Information Sharing & Feedback Loop is intended to support transparency, clarity of roles, and timely engagement, while maintaining appropriate sequencing between regulatory review, advisory input, and project decision-making. PROJECT 205 - PROCEDURAL SUMMARY LEGEND Vocabulary Definition Coming Street Commons A College of Charleston capital project proposed for the property at 106 Coming Street and 99 Vanderhorst St in Charleston, South Carolina. Project 205—also referred to as Coming Str eet Commons—encompasses the planned redevelopment of the former YWCA of Greater Charleston site and the historic Municipal Cemetery. The project includes archaeological investigation, respectful treatment and reinterment of human remains, and memorialization informed by regulatory review and community engagement for the future development of a student residence hall. “Project 205” is the official internal and regulatory project designation used in permitting, work plans, and agency correspondence, while “Coming Street Commons” is commonly used as the public-facing project name in outreach and informational materials. Procedural Summary Matrix The procedural matrix developed for Project 205 serves as a concise summary of the project’s complex, phased coordination between archaeological investigation and project development. It outlines the sequencing of work stages, associated tasks, and decision thresholds, while identifying participating stakeholders at each phase. The matrix also documents stop-work triggers, notification and reporting requirements, and pathways for evaluation and response should archaeological materials or human remains be encountered. By presenting these elements in an integrated format, the matrix functions as a practical reference tool to ensure that archaeological stewardship and development activities proceed in a coordinated, transparent, and accountable manner. Procedural Summary Legend The procedural legend is intended to supplement the overall project glossary and acronyms by establishing consistent project vocabulary and clarifying the intended meaning and application of key terminology. Revision 5/20/2026 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX E: COLLEGE OF CHARLESTON COMMITMENT LETTER Andrew T. Hsu, Ph.D. President 843.953.5500 | PRESIDENT@COFC.EDU 66 GEORGE ST. | CHARLESTON, SC 29424- 0001 December 17, 2025 Dear South Carolina State Historic Preservation Office, On behalf of the College of Charleston, I write to reaffirm our institution’s commitment to responsible stewardship, transparency and meaningful community engagement as we move forward with the proposed student housing project at 106 Coming Street in downtown Charleston, a site zoned for high-density residential use by the City of Charleston Council in 2023. We recognize the historical and cultural significance of this location and the importance of ongoing coordination with the South Carolina State Historic Preservation Office. In that spirit, and in keeping with the recommendations of our Community Engagement Council and project partners, the College is committed to the following specific actions and documentation practices, which we respectfully outline below. • The consultants team will use the College of Charleston Libraries (which includes the Avery Research Center for African American History and Culture) as its primary repository for all findings and documentations related to the project. The CofC Libraries will also hold all future produced internal scholarship (both from faculty and students); these research documents will be shared with SHPO for their records. • The College’s consultants team will provide monthly updates, with benchmark reports/findings (Stages 1 & 2), as well as weekly reports during active archaeology (Stage 3). These updates will include, but are not limited to, all Community Engagement Council meeting minutes, website updates, City of Charleston Council engagements, tribal communications, YWCA Executive Committee communications, Charleston Board of Architectural Review communications and larger community meetings. • Thus far, the College’s project team has worked closely with the YWCA Executive Committee, with individual meetings in spring 2025 (April and May) and inclusion in the three subsequent Community Engagement Meetings, coordinated by the Asiko Group (June, August and September 2025). In the September 2025 meeting, the YWCA leadership had a table, sharing information about their past and current programs. The YWCA leadership will be instrumental in future commemoration, which includes a College-produced video of their history (for the YWCA website) as well as physical commemoration on the project site. • In working with recommendations of the Community Engagement Council, the College will continue to sponsor or host larger community engagement gatherings as well as update its project website with appropriate milestones and plans. Taken together, these commitments reflect the College of Charleston’s deep respect for the historical, cultural and community significance of the 106 Coming Street site and our intent to proceed with care, transparency and accountability at every stage of the project. We remain committed to ongoing consultation with SHPO and our community partners, and we welcome continued guidance as this work advances. The College of Charleston views this project not only as an investment in student housing, but also as an opportunity to document, honor and responsibly steward Charleston’s shared history. Sincerely, Andrew T. Hsu Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX F: COLLEGE OF CHARLESTON ACHP POLICY OUTLINE 1 | Page College of Charleston Project 205 – Coming Street Commons Addressing: ACHP - Policy Statement on Burial Sites, Human Remains, and Funerary Objects (2023) T he College recognizes that the expanded understanding of the burial ground has introduced significant ethical, cultural, and practical considerations that were not fully understood at the time of acquisition. As a result, the College has evaluated a range of possible paths forward, including private sale, no n- development, and student residence development. Each option presents substantial trade-offs in terms of stewardship, community influence, financial feasibility, and long-term care. At this stage, given existing ownership, zoning, and the absence of a viable acquisition or funding pathway for non-development alternatives, the College is focusing on how to ensure that any actions taken reflect the highest possible standards of care, transparency, and community engagement. This includes ongoing consultation and the incorporation of C ommunity Engagement Council advice into archaeological planning, human remains handling and treatment decisions, and memorialization. Although Project 205 is not a federal undertaking, and the burial ground currently lacks sufficient information for a determination of eligibility under Criterion D of the National Register of Historic Places pursuant to the Secretary of the Interior’s Standards as administered by the South Carolina State Historic Preservation Office (SC SHPO), the College of Charleston is committed to exercising a high standard of stewardship. To that end, the College will utilize the Advisory Council on Historic Preservation’s (ACHP) guiding Principles to inform the project. This outline begins to address CEC concerns related to Principles 1–3, with the understanding that these commitments may evolve and be further refined and expanded to encompass all thirteen Principles over time. In alignment with Principle 1, which requires that burial sites, human remains, and funerary objects be treated with dignity and respect in all circumstances regardless of National Register eligibility or project context, the College is committed to: • Ensuring respectful treatment in every phase of work, including the removal and reinternment of any human remains found, guided by the Archaeological Work Plans, which incorporate South Carolina archaeology standards, nationally recognized protocols, and methodologies for the handling, documentation, and protection of burial sites, human remains, associated features, and funerary objects. • Based on current structural, engineering, and regulatory requirements, avoidance and minimization present significant challenges. The College continues to evaluate these constraints alongside community input and evolving project information. • Prioritizing meaningful, ongoing consultation with descendant communities, facilitated in par t t hrough the Community Engagement Council (CEC) and additional public -facing processes , 2 | Page including Community Outreach Forums corresponding with Work Plan stoppages , updates on project website, and future collaborative discussions to ensure that handling and treatment practices, blessing or ceremonial activities, interpretation, and any culturally significant considerations are informed by community perspectives and reflect dignity and respect in all interactions. In alignment with Principle 2 , which emphasizes avoiding disturbance to burial sites whenever practicable and requiring a transparent, well-documented alternatives analysis when avoidance is not feasible, the College notes the following: • The College has conducted an extensive review of potential alternative locations over the past ten y ears. The College acknowledges ongoing requests for additional detail regarding this analysis and is working to provide further clarification of the methodology and comparative considerations used to assess feasibility. Methods being considered for further clarification: o Construction Feasibility Methodology and considerations o Archaeology Feasibility Methodology: costs and timelines may vary depending on findings and a range of scenarios. This will be considered internally to balance cost vs time without sacrificing care and quality. o Costing Category Distinctions: construction, archaeology, reinternment, memorialization, and commemoration • During the College’s ten-year review and study of potential alternative locations for the needed residence hall it was determined that, given Charleston’s constrained peninsula geography and current market conditions, only one other undeveloped parcel of comparable size (~2 acres) exists; this parcel is now under private development, leaving no feasible alternative within proximity of the College’s main campus. Additionally, Charleston’s historic building stock, zoning restrictions, and building-code requirements for new collegiate residential facilities make adaptive reuse or infill alternatives impracticable for a viable project with the required density needed. Given th e c urrent conditions, including land ownership, zoning, and lack of feasible acquisition alternatives, the College believes that the project allows for the highest level of stewardship, transparency, and community input. • Engaging in ongoing, descendant -centered consultation in part through the Community Engagement Council (CEC), which serves as the primary forum for treatment methods, ceremonial considerations, reinterment preferences, and commemoration priorities. Along with providing public-facing transparency through the project website, community updates, and Community Outreach Forums corresponding with Work Plan stoppages to solicit broader community feedback and discussions of project updates. • Determinations by the consulting AEs confirmed that preservation in place is not viable due to the structural engineering requirements of a multi-story building, Storm Water requirements, and subsurface conditions that are incompatible with leaving the burial ground undisturbed. In addition, the SC SHPO concluded that insufficient information currently exists to support National Register eligibility under Criterion D, and that the burial ground is not eligible under Criterion A. Despite the lack of regulatory triggers, the College remains committed to 3 | Page institutional stewardship by applying the ACHP’s policy framework. In alignment with Principle 2, the College seeks to advance a mitigation strategy that reflects the ACHP’s expectations when avoidance is not feasible, including development of a comprehens ive memorialization plan and the creation of a historical repository for archaeological and cultural findings. In alignment with Principle 3, which emphasizes early, inclusive, and culturally informed consultation with descendant or associated communities, even when no definitive descendant group can be identified, the College is committed to: • A cknowledging that no lineal descendants have been formally identified through archival records to date; however, the College recognizes and welcomes engagement from individuals and communities who identify cultural or ancestral connections to the site. • The College recognizes that consultation is an ongoing process and that community members, including CEC participants, have expressed the need for earlier and more direct opportunities to provide input prior to key project submissions. In response, the College is working to incorporate additional opportunities for review and feedback as part of an iterative engagement process and established Information Sharing and Feedback Loop. • The Community Engagement Council (CEC) is made up of community members with demonstrated care and cultural interest in the burial ground. While the CEC is not a replacement for the broader descendant communities or communities of care , the CEC serves as a self- nominated representative advisory body to guide respectful treatment, provide input on culturally-sensitive practices, and help shape commemoration. The CEC is one component of a broader and evolving approach to engagement with descendants and communities of care. • Not only are the CEC meetings open to the public to promote transparency, but the College established a public-facing project website to share updates and information openly. Throughout the project’s trajectory, future Community Outreach Forums will be held to ensure two -wa y c ommunication and opportunities for community feedback , and questions to occur. Acknowledging community concerns that “information is not consent,” and ensuring that engagement is not treated as approval, the College seeks to establish and maintain ongoing dialogue. • In conducting good -faith outreach to 13 Tribal Nations with South Carolina connections, the College provided background materials about the burial ground, explained the potential for encountering historic remains, and invited any Tribal Nation with ancestr al ties to share documentation, cultural information, or guidance on procedures they would want follow ed s hould identifiable Native American remains be discovered. No deadlines were imposed in the request for response to respect differing tribal capacities and timelines. To date, the College has received responses from two, while continuing to keep communication channels open for additional input. • CofC administration will commit to sharing work plans (via email attachments and the Google Drive) when they are submitted to state agencies, for discussion and recommendations from the CEC. If adopted, the recommendations will be added as amendments that will be appended to the work plans. 4 | Page • CEC Recommendations and Lines of Action can be followed in this document: https://docs.google.com/spreadsheets/d/1exP6- HTPqZIIbyeJtYOKGwEsNZx8BNLJvXeaS2TAQyo/edit?usp=sharing While Section 106 is not applicable to Project 205 due to no federal undertaking, and no nexus has initiated NAGPRA protocols, the College may be informed by ACHP Principle 3 to support culturally informed, respectful treatment decisions and meaningful con sultation. The College recognizes that no definitive descendant group can be identified due to the lack of surviving historic burial records and the SC SHPO finding that the cemetery does not meet Criterion A and lacks sufficient information for a Criterion D determination. Even so, the College is proceeding with a stewardship-based approach in which all archaeological, interpretive, and commemorative decisions are informed by inclusive community and Tribal engagement. This includes working in accordance with South Carolina archaeological standards and nationally recognized best practices for cemetery investigations, creating opportunities for affiliated and interested communities to provide input on the respectful handling, documentation, and reinterment of any remains, and acknowledging community feedback that “information is not consent.” The College has also incorporated public transparency through open CEC meetings, a dedicated project website, and will continue this dialogue through future Community Outreach Forums. These measures, working in tandem to help ensure that treatment actions, such as documentation choices, ceremonial practices, and cultural protocols, reflect the values and perspectives of those with cultural, historical, or community ties to the site, even in the absence of formal regulatory triggers. Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX G: INFORMATION SHARING AND FEEDBACK LOOP Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX H: TRIBAL OUTREACH AND NAGPRA 1 | P a g e College of Charleston Project 205 – Coming Street Commons Tribal Outreach & NAGPRA Although there is not a federal nexus triggering the Section 106 process, because there is no federal agency involvement, funding, or permitting, there is a possibility of encountering historical Native American Burials interred within the boundaries of th e municipal cemetery/potter’s field. With the addition to the larger public and descendant community engagement, the College, with aid from Terracon Consultants, is continuing work on outreach and communication to Federal, State, and Local Tribes. Continued correspondence between these sovereign nations and tribes will be shared, along with all monthly engagement updates, with SCDAH as part of the ongoing agreement and checkpoints established in compliance with the Cemetery and Commemoration Work Plan. In the event the Native American Graves Protection and Repatriation Act (NAGPRA) is triggered due to encountering identifiable Native American human remains, lines of communication will be open. The Accessible Test – Steps 1 through 8 for Repatriation of human remains or associated funerary objects from the National NAGPRA Program can be found following this introduction. Formal Consultation with the tribes has not yet occurred, so these protocols are not included in this draft of the work plan. Any protocols established will be at the discretion of the Tribes for release or inclusion into the project public record in accordance with their standards. In addition, the College has reached out to the following agencies for resources and information concerning applicable laws and regulations: - South Carolina Institute for Archaeology and Anthropology - National NAGPRA Program, National Park Service - Advisory Council on Historic Preservation The College of Charleston has undertaken good -faith outreach and engagement with Federally recognized Tribal Nations with historical and ancestral connections to South Carolina and the project area. To date, project notification letters have been sent to thirteen (13) Tribal Nations , providing background information on Project 205, the site history, and the potential for encountering archaeological materials and human remains, and inviting dialogue regarding culturally appropriate protocols and procedures. An example letter can be found following this introduction. As part of this engagement, the College has held a one-on-one consultation meeting with representatives of the Muscogee (Creek) Nation , during which project background, anticipated investigative approaches, and project considerations were discussed. In 2 | P a g e addition, the Catawba Indian Nation has requested a one -on-one meeting , and the College has responded affirmatively and is currently awaiting further direction regarding scheduling and preferred format. The College remains committed to maintaining open lines of communication with Tribal Nations throughout the project and recognizes that consultation timelines and participation vary among Tribes. No response deadlines have been imposed. Continued outreach, information sharing, and opportunities for consultation will occur as the project progresses and as additional information becomes available through staged archaeological investigations. Repatriation of human remains or associated funerary objects Step 1: Step 2: Step 3: Compile an itemized list. Initiate consultation. Consult. • The number of individuals • Respond to any consulting and associated funerary party objects • Address identification of • The geographical location lineal descendants, Indian • The acquisition history Tribes or NHOs with cultural • Other information to identify affiliation, types of lineal descendants or cultural associated funerary objects, affiliation • Any lineal descendant • Any Indian Tribe or NHO with potential cultural affiliation • Include itemized list, names of all consulting parties, and proposed timeline and method for consultation and duty of care • Presence of any hazardous • Make a record of substance treatment consultation 43 CFR 10.lO(a) 43 CFR 10.lO(b) 43 CFR 10.lO(c) Six months after Step 4 Any time after Step 5 90 days after Step 6 Step 5: Step 6: Step 7: Submit a Notice. Receive and consider Respond to requests. requests. • Abstract of information in • Joint request is a single • Written response to itemized list request requester and any other • Determination in inventory • Criteria for a request is party in notice • Total number of individuals EITHER: • ONE of following: associated funerary objects • Requester is identified in • Meets the criteria • Contact information to the notice OR • Does not meet the criteria submit requests • Requester shows lineal and request more descent or cultural information ! Send to consulting parties affiliation - preponderance • Competing requests and National NAGPRA ! of the evidence received 43 CFR 10.lO(e) 43 CFR 10.lO(f) 43 CFR 10.lO(g) Accessible Text - Steps 1 through 8 Step 4: Complete an inventory. • Consulting parties and dates • Itemized list, updated • For each entry, a determination: • Lineal descendant • Clearly identified cultural affiliation • Reasonably identified cultural affiliation • None of the above ! Send to consulting parties and National NAGPRA ! 43 CFR 10.lO(d)(l) 90 days after Step 7 Step 8: Repatriation. • Written statement relinquishes possession or control to requestor(s) • After statement, consult on and document physical transfer and protect sensitive information ! Send to requestor(s) and National NAGPRA ! 43 CFR 10.lO(h) National NAGPRA Program Updated 1/17/2025 1 January 28, 2026 College of Charleston 66 George Street Charleston, SC 29424 XXXX XXXX XXXX XXXX XXXX XXXX Re: College of Charleston’s Proposed Student Residence Hall, 106 Coming Street, Charleston, South Carolina Dear XXXX, The College of Charleston is a public university, situated at 66 George Street, Charleston, South Carolina. Considered the oldest institution of higher education in South Carolina, the College was founded in 1770 and chartered in 1785. Presently, the College of Charleston proposes to construct a 1,000-bed planned student residence hall, Coming Street Commons, also known as Project 205, 106 Coming Street and/or 99 St. Philip, or the College of Charleston St. Philip Housing Development. The College is an institution of higher education of the State, authorized by the Higher Education Act to issue higher education facilities revenue bonds for the purpose of financing or refinancing in whole or in part the cost of acquisition, construction, reconstruction, renovation and improvement of land, buildings, and other improvements to real property constituting Higher Education Facilities under the General Bond Resolution and the Higher Education Act. No federal funding is anticipated as part of this project. The project requires a National Pollutant Disch arge Elimination System (NPDES) Construction Stormwater General Permit and a Coastal Zone Consistency (CZC) Certification. The Clean Water Act (CWA) created the NPDES program, and the US Environmental Protection Agency (EPA) has delegated the authority of issuing NPDES permits to the states. As such, the states are empowered to administer their own permitting program, as long as it complies with the requirements of the NPDES permit. Thus, State-issued NPDES permits are not considered a federal undertaking. In South Carolina, the Department of Environmental Services (DES) issues and manages NPDES permits. The DES’ Bureau of Coastal Management (BCM) issues the CZC certificates as part of the permitting process for ground disturbance in the coastal zone areas of South Carolina. The College’s land holdings are state-controlled. The project location is bordered by Vanderhorst (north), St. Philip (east), Calhoun (south), and Coming (west) streets ( Attachments 1 and 2 ). It encompasses the location of the former one-story Young Women’s Christian Association (YWCA) of Greater Charleston building and a Potter’s Field (Public Burial Ground B). EXAMPLE TRIBAL CORRESPONDANCE 2 The YWCA originally operated out of a private residence at 106 Coming Street between 1911 and 1963. The house was demolished in 1963 and 1964, with the current building being constructed in 1965; it remained in operation through 2014. The YWCA at Coming Street served African American women, while a second YWCA located on George Street served the white community. The Coming Street YWCA played an important role in the local Civil Rights moveme nt of the 1960s; for instance, several of the YWCA Board and members participated in the 1969 Charleston Hospital Strike. The City of Charleston’s Board of Architectural Review approved demolition of the building, which will be recorded through Historic American Building Survey (HABS) documentation for submittal to the South Carolina Department of Archives and History, Historic Preservation Department’s State Historic Preservation Office (SHPO). A copy of the report summarizing this resource is provided in Attachment 3. The Potter’s Field is also known as Public Burial Ground B (See Attachment 2). The cemetery was used for burials from 1793 to 1807, which includes burials lin ked to the trans-Atlantic slave trade. In 1817, the City subdivided the land into 11 lots, which were leased for residential development; the property was formally sold in the 1840s. The cemetery was used for interment of free white persons, strangers, foreigners, slaves, and people of color. Historically in some census records, Native Americans were enumerated as “all other free persons.” The proximity of the Orphan House, the Poor House, and City Hospital to the cemetery also suggests children of unknown ethnicities might be interred in the public cemetery (See Attachment 2). The cemetery has not been formally evaluated. A copy of the report summarizing the cemetery is provided in Attachment 3. In 2014, a private developer (McAlister Development Group) purchased the YWCA to develop a high- density student housing complex. The Charleston City Council approved the site for high-density student housing in 2023. In 2025, the College of Charleston acquired 1.14 acres of land which overlays approximately one-third of the original boundary of the cemetery and includes the YWCA building. At the time of the purchase, the land was appraised at $75.8 million for two parcels (106 Coming and 99 St. Philip streets). The College is committed to honoring the full and complex history of the property by thoughtfully incorporating two permanent commemora tion sites into its footprint. These sites will recognize the legacy of the YWCA, whose presence on the property reflects a history of community service, advocacy and support, as well as the Potter’s Field, which serves as a solemn reminder of those who were laid to rest there and whose lives dese rve remembrance and dignity. By embedding these commemorative spaces into the landscape of the pr operty, the College affirms its responsibility to preserve historical memory, acknowledge past uses of the land and create places for reflection, education and respect for the individuals and communities connected to this site. Liollio, in partnership with Outdoor Spatial Design (OSD), the landscape architect for the Anson Street Burial Commemoration, is the design team working on the commemoration design in coordination with the Community Engagement Council (CEC). In addition to the SC DES and BCM, the College referenced resources from South Carolina Institute for Archaeology and Anthropology (SCIAA); South Carolina State Historic Preservation Office (SC SHPO); the National Park Service (NPS); the Advisory Counc il on Historic Preservation (ACHP); and Terracon Consultants on this project. The SHPO has determined that Section 106 is not applicable for the current project, as there is no federal funding, federal permitting or licenses, or federal land involved. The College of Charleston established a Community Engagement Council (CEC) to support the College’s stewardship of the property and to help guide thoughtful, inclusive approaches to commemoration. The 3 Council brings together representatives from the community, archaeologists, historians, and College stakeholders to ensure that multiple perspectives inform how the site is understood, interpreted and remembered. Through dialogue, collaboration and sh ared expertise, the Council will help the College honor the property’s layered history, recommend appropriate forms of commemoration anid foster transparency and trust as the College moves forward as a responsible steward of this important place. For additional information regarding the CEC and proposed project, see this webpage: https://coming- street-commons.charleston.edu/community-engagement-council. A records search for a half-mile radius of the project area identified 38 previously recorded archaeological resources (See Attachment 3). Additionally, there are four historic areas; 134 historic structures; one Revolutionary War point; and 23 NRHP points (See Attachment 3 ). Four cultural resources surveys were performed within the half-mile radius in addition to two reports that focus on the YWCA and Cemetery (See Attachment 3). The College recognizes the significance and sensitiv ity involved in any excavation or disturbance of Public Burial Ground B. By way of this letter, we are requesting that you provide any documentation that links the burials at this site with your Tribal ancestors and any corresponding protocols. The College recognizes the Indigenous history of this region and the treaties connected to it, as well as the significant contributions Native American communities have made to this portion of South Carolina. We also recognize the painful legacy of displacement and on going erasure of Native history. Should you have any questions, comments, or would like to set up a virtual meeting at a mutually agreeable time, please contact Ms. Laura Lee Worrell, Senior Project Mana ger, Facilities Management, at the College of Charleston, 133 Calhoun Street, Office 211, Charleston, South Carolina, 29424 or via email at worrellLL@cofc.edu. Respectfully, LAURA LEE WORRELL Senior Project Manager, Facilities Management Attachments: 1. Map of Proposed Project Location and associated locational information 2. Historical Maps and Images 3. Cultural Resources Records Search for one-half mile radius of project location (Confidential) Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX I: SWPPP–STORM WATER POLLUTION PREVENTION PLAN © 2025 Microsoft Corporation © 2025 TomTom ASHLEY RIVER CHARLESTON HARBOR C Copyright 2025. All Rights Reserved. Reproduction, copying, or use of this drawing and designs shown thereon without written consent of Liollio Architecture, Inc. is prohibited and any infringement is subject to legal action. 106 COMING STREET 25700 CBC / GFJ ARW 03/16/26 Revision DateDescription H15-9689-PD PROJECT 205 NEW CONSTRUCTION ENGINEERING 1226 YEAMANS HALL ROAD HANAHAN, SC 29410 ADC PROJECT 843-566-0161 #25039 ADCENGINEERING.COM EARLY SITE PACKAGE Checked By: Drawn By: Date: Project Number: Scale: State Project Number: CIVIL COVER SHEET C001 COLLEGE OF CHARLESTON PROJECT 205 NEW CONSTRUCTION - EARLY SITE PACKAGE 106 COMING STREET CITY OF CHARLESTON, SOUTH CAROLINA TMS# MULTIPLETRC-SP2025-000857 CALHOUN ST CALHOUN ST COMING ST SAINT PHILIP ST VANDERHORST ST ARCHEOLOGICAL NOTICE TO CONTRACTORS: AN ARCHEOLOGICAL WORK PLAN HAS BEEN CREATED FOR THIS SITE. THE WORK PLAN IS AVAILABLE FROM THE OWNER. ALL CONTRACTORS SHALL BE AWARE OF THE WORK PLAN AND THE REQUIREMENTS CONTAINED WITHIN AND SHALL FULLY COMPLY. ALL WORK NOT PERFORMED BY THE PROJECT ARCHEOLOGIST SHALL BE MONITORED BY THE PROJECT ARCHEOLOGIST. · · C Copyright 2025. All Rights Reserved. Reproduction, copying, or use of this drawing and designs shown thereon without written consent of Liollio Architecture, Inc. is prohibited and any infringement is subject to legal action. 106 COMING STREET 25700 CBC / GFJ ARW 03/16/26 Revision DateDescription H15-9689-PD PROJECT 205 NEW CONSTRUCTION ENGINEERING 1226 YEAMANS HALL ROAD HANAHAN, SC 29410 ADC PROJECT 843-566-0161 #25039 ADCENGINEERING.COM EARLY SITE PACKAGE Checked By: Drawn By: Date: Project Number: Scale: State Project Number: CIVIL NOTES AND ABBREVIATIONS C002 SHEET NUMBER OF PROJECT NO. SCALE APPROVED LAST REVISED DRAWN/CHECKED DATE JEFFREY S COOPER APRIL 21, 2025 JSC/LSM JSC 1" = 20' 6490 1 2 AND LAND PLANNING (843) 571-2622 FAX (843) 571-6780 CHARLESTON, SOUTH CAROLINA 29417 1587 SAVANNAH HIGHWAY SUITE B P.O. BOX 30575 CIVIL ENGINEERING, SURVEYING N CITY OF CHARLESTON, CHARLESTON COUNTY, SOUTH CAROLINA 10 PARCELS TOPOGRAPHIC SURVEY LOCATED ON SAINT PHILIP STREET, VANDERHORST STREET & COMING STREET OCTOBER 14, 2025 C-003a SHEET NUMBER OF PROJECT NO. SCALE APPROVED LAST REVISED DRAWN/CHECKED DATE JEFFREY S COOPER APRIL 21, 2025 JSC/LSM JSC N/A 6490 2 2 AND LAND PLANNING (843) 571-2622 FAX (843) 571-6780 CHARLESTON, SOUTH CAROLINA 29417 1587 SAVANNAH HIGHWAY SUITE B P.O. BOX 30575 CIVIL ENGINEERING, SURVEYING CITY OF CHARLESTON, CHARLESTON COUNTY, SOUTH CAROLINA 10 PARCELS TOPOGRAPHIC SURVEY LOCATED ON SAINT PHILIP STREET, VANDERHORST STREET & COMING STREET OCTOBER 14, 2025 C-003b C Copyright 2025. All Rights Reserved. Reproduction, copying, or use of this drawing and designs shown thereon without written consent of Liollio Architecture, Inc. is prohibited and any infringement is subject to legal action. 1640 Meeting Street RdSuite 202Charleston, SC 29405P 843.762.2222 106 COMING STREET 25700CBC / GFJARW03/16/26 Revision DateDescription H15-9689-PD PROJECT 205NEW CONSTRUCTION ENGINEERING1226 YEAMANS HALL ROADHANAHAN, SC 29410 ADC PROJECT843-566-0161 #25039ADCENGINEERING.COM EARLY SITE PACKAGE 1040 Hull Street, Suite 100Baltimore, MD 21230P 410.347.8500 Checked By:Drawn By:Date:Project Number:Scale: State Project Number: SWPPP & EROSIONCONTROL - INITIALPHASEC1001" = 20' ARCHEOLOGICAL NOTICE TO CONTRACTORS:AN ARCHEOLOGICAL WORK PLAN HAS BEEN CREATED FOR THIS SITE. THE WORK PLAN ISAVAILABLE FROM THE OWNER. ALL CONTRACTORS SHALL BE AWARE OF THE WORK PLAN AND THEREQUIREMENTS CONTAINED WITHIN AND SHALL FULLY COMPLY. ALL WORK NOT PERFORMED BYTHE PROJECT ARCHEOLOGIST SHALL BE MONITORED BY THE PROJECT ARCHEOLOGIST. C Copyright 2025. All Rights Reserved. Reproduction, copying, or use of this drawing and designs shown thereon without written consent of Liollio Architecture, Inc. is prohibited and any infringement is subject to legal action. 1640 Meeting Street RdSuite 202Charleston, SC 29405P 843.762.2222 106 COMING STREET 25700CBC / GFJARW03/16/26 Revision DateDescription H15-9689-PD PROJECT 205NEW CONSTRUCTION ENGINEERING1226 YEAMANS HALL ROADHANAHAN, SC 29410 ADC PROJECT843-566-0161 #25039ADCENGINEERING.COM EARLY SITE PACKAGE 1040 Hull Street, Suite 100Baltimore, MD 21230P 410.347.8500 Checked By:Drawn By:Date:Project Number:Scale: State Project Number: SWPPP & EROSIONCONTROL - DEMO &ARCHEOLOGICALPHASEC1011" = 20' ARCHEOLOGICAL NOTICE TO CONTRACTORS:AN ARCHEOLOGICAL WORK PLAN HAS BEEN CREATED FOR THIS SITE. THE WORK PLAN ISAVAILABLE FROM THE OWNER. ALL CONTRACTORS SHALL BE AWARE OF THE WORK PLAN AND THEREQUIREMENTS CONTAINED WITHIN AND SHALL FULLY COMPLY. ALL WORK NOT PERFORMED BYTHE PROJECT ARCHEOLOGIST SHALL BE MONITORED BY THE PROJECT ARCHEOLOGIST. C Copyright 2025. All Rights Reserved. Reproduction, copying, or use of this drawing and designs shown thereon without written consent of Liollio Architecture, Inc. is prohibited and any infringement is subject to legal action. 1640 Meeting Street RdSuite 202Charleston, SC 29405P 843.762.2222 106 COMING STREET 25700CBC / GFJARW03/16/26 Revision DateDescription H15-9689-PD PROJECT 205NEW CONSTRUCTION ENGINEERING1226 YEAMANS HALL ROADHANAHAN, SC 29410 ADC PROJECT843-566-0161 #25039ADCENGINEERING.COM EARLY SITE PACKAGE 1040 Hull Street, Suite 100Baltimore, MD 21230P 410.347.8500 Checked By:Drawn By:Date:Project Number:Scale: State Project Number: EXISTINGCONDITIONS &DEMOLITION PLANC1101" = 20' ARCHEOLOGICAL NOTICE TO CONTRACTORS:AN ARCHEOLOGICAL WORK PLAN HAS BEEN CREATED FOR THIS SITE. THE WORK PLAN ISAVAILABLE FROM THE OWNER. ALL CONTRACTORS SHALL BE AWARE OF THE WORK PLAN AND THEREQUIREMENTS CONTAINED WITHIN AND SHALL FULLY COMPLY. ALL WORK NOT PERFORMED BYTHE PROJECT ARCHEOLOGIST SHALL BE MONITORED BY THE PROJECT ARCHEOLOGIST. C Copyright 2025. All Rights Reserved. Reproduction, copying, or use of this drawing and designs shown thereon without written consent of Liollio Architecture, Inc. is prohibited and any infringement is subject to legal action. 1640 Meeting Street RdSuite 202Charleston, SC 29405P 843.762.2222 106 COMING STREET 25700CBC / GFJARW03/16/26 Revision DateDescription H15-9689-PD PROJECT 205NEW CONSTRUCTION ENGINEERING1226 YEAMANS HALL ROADHANAHAN, SC 29410 ADC PROJECT843-566-0161 #25039ADCENGINEERING.COM EARLY SITE PACKAGE 1040 Hull Street, Suite 100Baltimore, MD 21230P 410.347.8500 Checked By:Drawn By:Date:Project Number:Scale: State Project Number: CIVIL DETAILS -SWPPP & EROSIONCONTROLC610 · · C Copyright 2025. All Rights Reserved. Reproduction, copying, or use of this drawing and designs shown thereon without written consent of Liollio Architecture, Inc. is prohibited and any infringement is subject to legal action. 1640 Meeting Street RdSuite 202Charleston, SC 29405P 843.762.2222 106 COMING STREET 25700CBC / GFJARW03/16/26 Revision DateDescription H15-9689-PD PROJECT 205NEW CONSTRUCTION ENGINEERING1226 YEAMANS HALL ROADHANAHAN, SC 29410 ADC PROJECT843-566-0161 #25039ADCENGINEERING.COM EARLY SITE PACKAGE 1040 Hull Street, Suite 100Baltimore, MD 21230P 410.347.8500 Checked By:Drawn By:Date:Project Number:Scale: State Project Number: CIVIL DETAILS -SWPPP & EROSIONCONTROLC611 ’ ’ “ “ C Copyright 2025. All Rights Reserved. Reproduction, copying, or use of this drawing and designs shown thereon without written consent of Liollio Architecture, Inc. is prohibited and any infringement is subject to legal action. 1640 Meeting Street RdSuite 202Charleston, SC 29405P 843.762.2222 106 COMING STREET 25700CBC / GFJARW03/16/26 Revision DateDescription H15-9689-PD PROJECT 205NEW CONSTRUCTION ENGINEERING1226 YEAMANS HALL ROADHANAHAN, SC 29410 ADC PROJECT843-566-0161 #25039ADCENGINEERING.COM EARLY SITE PACKAGE 1040 Hull Street, Suite 100Baltimore, MD 21230P 410.347.8500 Checked By:Drawn By:Date:Project Number:Scale: State Project Number: CIVIL DETAILS -SWPPP & EROSIONCONTROL NOTESC612 Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX J: TERRACON GEOTECHNICAL REPORT EXCERPT St. Phillips Housing Innovation District St. Phillips Housing Innovation District St. Phillips Housing Innovation District Archaeology Work Plan Project 205 New Construction | Charleston County, South Carolina May 26, 2026 | Terracon Project No. EN25P081 Facilities | Environmental | Geotechnical | Materials APPENDIX K: SHPO CORRESPONDENCE July 03, 2025 Terri Russ, RPA Department Manager - Natural & Cultural Resources Terracon 3150 Spring Forest Road, Suite 100 Raleigh, NC 27616 Terri.Russ@terracon.com Re: College of Charleston, Coming Street Commons, 106 Coming Street, Archaeological Monitoring Plan, Revised Draft Charleston, Charleston County, South Carolina SHPO Project No. 25-RL0214 Dear Terri Russ: Thank you for your project correspondence which we received on June 17th, 2025, that you submitted regarding the College of Charleston, Coming Street Commons, 106 Coming Street, Archaeological Monitoring Plan, Draft. We have received a copy of the Plan for Archaeological Monitoring, Coming Street Commons, College of Charleston, Charleston, Charleston County, South Carolina as supporting documentation for this undertaking. The State Historic Preservation Office (SHPO) is providing comments Terracon and the College of Charleston through the South Carolina Department of Environmental Services, Bureau of Coastal Management (SCDES-BCM) in accordance with the South Carolina Coastal Zone Management Act of 1976, as amended (South Carolina Code Title 48, Chapter 39), the “Policies and Procedures of the South Carolina Coastal Zone Management Program” and the 1996 Memorandum of Agreement between our Offices concerning implementation of the South Carolina Coastal Management Program. Consultation with the SHPO is not a substitution for consultation with Tribal Historic Preservation Offices, other Native American tribes including those with state recognition, local governments, or the public. The SHPO concurs with the archaeological monitoring methodologies proposed in the Plan for Archaeological Monitoring, Coming Street Commons, College of Charleston, Charleston, Charleston County, South Carolina. The SHPO concurs with the revised draft, incorporating our requested revisions, and accepts the revised draft as final; we have no additional comments or concerns currently. Please inform our office of when the archaeological monitoring will begin and when the monitor is in the field. Due to the nature of the undertaking, please provide our office weekly updates on the status of the archaeological monitoring. Should any damage occur to an archaeological site from proposed construction when the archaeological monitor is not present, the recordation of this damage must follow our office’s Guidance for Assessing Damage to Archaeological Sites (https://scdah.sc.gov/sites/scdah/files/Documents/Historic%20Preservation%20(SHPO)/Programs/Progra ms/Review%20and%20Compliance/Guidance-Assesing-Damage-Archaeological-Sites.pdf). We do request, however, that our Office be notified immediately if archaeological materials or human skeletal remains are encountered prior to or during construction on the project site. Archaeological materials consist of any items, fifty years old or older, which were made or used by man. These items include, but are not limited to, stone projectile points (arrowheads), ceramic sherds, brick scatters, worked wood, bone and stone, along with metal and glass objects. Please refer to SHPO Project Number 25-RL0214 in any future correspondence regarding this project. If you have any questions, please contact me at 803-896-6181 or at RLarsen@scdah.sc.gov. Sincerely, Robert P. Larsen III, MSc., RPA Archaeologist State Historic Preservation Office /0 /1 /2 /3 /1 /i255 /0 /5 /5 /i255/6/7/3 /3 /5 /8 /8 /9 /10 /11 /12 /13 /14 /i255 /15 /14 /13 /16 /10 /17 /18 /i255/19/20/11 /20 /21 /10 /14 /22 /20 /17 /12 /0/12 /18 /12 /10 /9 /i255/19/20/11 /20 /21 /10/19/10/11 /18 /23 /24 /24 /i255 /17/20 /0 /25 /13 /26 /11 /i255 /9 /18 /27 /i255 /14 /13 /13/19/i255/28 /29 /30 /i255 /6/7/3 /3 /5/8 /8 /8 /8/31/32/7 /33 /32 /34 /5 /35 /2/i255 /36 /i255 /13 /22 /22 /12 /17 /10 /37 /i255 /38 /39 /24 /34 /40 /30 /24 /34 /23 /41 /39 /30 /42 /43 /44/45/46/i255 /48 /49 /50 /51 /52 /53/54 /55 /i255 /56 /57 /58 /59 /i255 /60 /56 /48 /49 /50 /51 /52 /53 /54/61/53/62 /63 /64 /58 /65 /53 /62 /65 /66 /57 /51 /67 /68 /69 /70 /71 /46 /i255 /72 /73 /74 /63 /64 /49 /55 /i255/48 /52 /75 /54 /52/76/77/52 /73 /i255 /78 /55 /i255 /79 /80 /79 /78 /i255 /81 /82 /83 /84 /i255 /85 /86 /87 /44 /46 /i255 /48 /62 /58 /88 /52 /77 /50 /52/73 /55 /i255 /56 /89 /53 /90 /59 /i255 /60 /56 /89 /53 /90 /59 /65 /48 /62 /58 /88 /52 /77 /50 /52 /73/61/54/52 /73 /73 /64 /62 /57 /59 /65 /62 /57/76/67/91 /i255 /92 /64 /73 /53 /52 /59 /55 /i255 /93 /57 /77 /52 /73 /54 /i255 /60 /93 /92 /64 /73 /53 /52 /59/61/53/62 /63 /64 /58 /65 /53 /62 /65 /66 /57 /51 /67 /91 /i255 /52 /94 /57/58 /59 /53 /57 /59 /60 /95 /56 /57 /58 /59 /53 /57 /59 /61/53 /62 /63 /64 /58 /65 /53 /62 /65 /66 /57 /51 /67 /91 /i255 /48 /64 /73 /64 /i255/96/65/i255 /97 /64 /73 /77 /64 /66 /64 /50 /50 /57 /i255 /60 /53 /64 /73 /64 /65 /77 /64 /73 /77 /64 /66 /64 /50 /50 /57/61/63/52 /53 /65 /53 /62 /65 /66 /57 /51 /67 /98 /99 /46 /i255 /97 /52 /59 /94 /64/76/74/59/65 /100 /58 /52 /75 /64 /89 /54/61/63/52 /53 /65 /53 /62 /65 /66 /57 /51 /i255 /60 /97 /52 /59 /94 /64/76/74/59 /65 /100 /58 /52 /75 /64 /89 /54/61/63/52 /53 /65 /53 /62 /65 /66 /57 /51 /67 /91 /i255 /101 /64 /73 /49 /i255 /56 /52 /59 /53 /52 /59 /i255 /60 /66 /64 /73 /49 /94/61/64/63 /62 /52 /59 /66 /74 /59 /52/52 /73 /74 /59 /66 /65 /62 /57/76/67/91 /102 /58 /73 /74 /53 /i255 /102 /57 /57 /103 /i255 /60 /62/58 /73 /74 /53 /62/61/64/63 /62 /52 /59 /66 /74 /59 /52 /52 /73 /74 /59 /66 /65 /62 /57/76/67/91 /i255/96/57/73 /73 /52 /50 /50 /55 /i255 /92 /64 /89 /73 /64 /i255 /92 /52 /52 /i255 /60 /88 /57 /73 /73 /52 /50 /50 /50 /50/61/62/57 /104 /62 /65 /52 /63 /89 /67 /91 /i255 /48 /62 /58 /89 /50 /54 /105 /55 /i255 /102 /73 /74 /53 /90 /60 /53 /62 /58 /89 /50 /54 /105 /62 /64/61/62/57 /104 /62 /65 /52 /63 /89 /67 /91 /i255 /56 /52 /59 /59 /74 /104 /52 /73 /85/61/64/63 /62 /52 /59 /66 /74 /59 /52 /52 /73 /74 /59 /66 /65 /62 /57/76/i255/60 /56 /52 /59 /59 /74 /104 /52 /73 /85/61/64/63 /62 /52 /59 /66 /74 /59 /52 /52 /73 /74 /59 /66 /65 /62 /57/76/67/91 /i255 /106 /57 /73 /59 /55 /i255/86/74/50/50 /53 /60/86/74/50 /50 /53 /65 /106 /57 /73 /59 /61/54 /52 /73 /73 /64 /62 /57 /59 /65 /62 /57/76/67/91 /i255 /93 /89 /53 /53 /55 /i255 /100 /52 /73 /73 /74 /i255 /107 /i255 /60 /100 /52 /73 /73 /74 /65 /93 /89 /53 /53/61/54/52 /73 /73 /64 /62 /57 /59 /65 /62 /57/76/67/91 /i255 /97 /57 /53 /62 /58 /74 /55 /i255 /106 /64 /51 /52 /60 /106 /64 /51 /52 /65 /97 /57 /53 /62 /58/74/61/54/52 /73 /73 /64 /62 /57 /59 /65 /62 /57/76/67/91 /i255 /56 /74 /50 /50 /65 /93 /57 /54 /58 /52 /59 /77 /52 /73 /66/61/63/52 /53 /65 /53 /62 /65 /66 /57 /51 /i255 /60 /56 /74 /50 /50 /65 /93 /57 /54 /58 /52 /59 /77 /52 /73 /66/61/63/52 /53 /65 /53 /62 /65 /66 /57 /51 /67 /68 /108 /109 /110 /69 /99 /71 /46 /i255 /93 /95 /82 /i255/85 /73 /57 /94 /52 /62 /54 /i255 /79 /80 /78 /i255 /111 /52 /88 /i255 /102 /57 /59 /53 /54 /73 /89 /62 /90 /57 /59 /i255 /112 /i255 /102 /113 /102 /114 /106 /95 /48 /114 /97 /102/86/i255/85 /73 /57 /94 /52 /62 /54 /i255 /93 /52 /51 /74 /52 /88 /i255 /72 /57 /73/76/i255/64 /59 /63 /i255 /107 /73 /62 /58 /64 /52 /57 /50 /57 /66 /49 /i255 /85 /50 /64/59 /i255 /48 /64 /73 /64 /55 /i255 /116 /89 /73 /i255 /57/117/62/52 /i255 /73 /52 /62 /52 /74 /51 /52 /63 /i255 /52 /50 /52 /62 /54 /73 /57 /59 /74 /62 /64 /50 /50 /49 /i255 /57 /59 /i255 /56 /89 /50 /49 /i255 /83 /83 /55 /i255 /79 /80 /79 /78 /i255 /54 /58 /52 /i255 /104 /57 /50 /50 /57 /88 /74 /59 /66 /i255 /63 /57 /62 /89/76/52/59 /54 /64 /90 /57 /59 /i255 /104 /73 /57/76/i255/56 /89 /53 /90 /59 /i255 /48 /62 /58 /88 /52 /77 /50 /52/73 /i255 /88 /74 /54 /58 /100 /52 /73 /73 /64 /62 /57 /59 /i255 /102 /57 /59/53 /89 /50 /54 /64 /59 /54 /53 /55 /i255 /118 /59 /62 /65 /i255 /104 /57 /73 /i255 /64 /i255 /75 /73 /57 /94 /52 /62 /54 /i255 /59 /64/76/52/63 /i255 /119 /85 /73 /57 /94 /52 /62 /54 /i255 /79 /80 /78 /i255 /111 /52 /88 /i255 /102 /57 /59 /53 /54 /73 /89 /62 /90 /57 /59 /120 /82 /i255 /i255 /112 /112 /64 /i255 /62 /57/76/75/50 /52 /54 /52 /63 /i255 /48 /121 /85 /116 /i255 /85 /73 /57 /94 /52 /62 /54 /i255 /93 /52 /51 /74 /52 /88 /i255 /72 /57 /73/76/i255/104 /57 /73 /i255 /48 /102 /i255 /106 /52 /75 /64 /73 /54/76/52/59 /54 /i255 /57 /104 /i255 /95 /59 /51 /74 /73 /57 /59/76/52/59 /54 /64 /50 /i255 /48 /52 /73 /51 /74 /62 /52 /53 /112 /97 /89 /73 /52 /64/89 /i255 /57 /104 /i255 /102 /57 /64 /53 /54 /64 /50 /86/64/59/64 /66 /52/76/52/59 /54 /i255 /122 /106 /95 /48 /112 /97 /102/86/123/i255 /75 /73 /57 /94 /52 /62 /54 /53 /112 /112 /64 /i255 /62 /57/75 /49 /i255 /57 /104 /i255 /64 /i255 /48 /89 /77 /53 /62 /73 /74 /77 /52 /73 /112 /124 /74 /52 /88 /i255 /48 /102 /i255 /107 /73 /62 /58 /48 /74 /54 /52 /i255/76/64/75 /112 /112 /54 /57 /75/57 /66 /73 /64 /75 /58 /74 /62 /i255 /53 /89 /73 /51 /52 /49 /i255 /75 /50 /64 /59 /i255 /53 /58 /52 /52 /54 /53 /i255 /122 /63 /64 /54 /52 /63 /i255 /107 /75 /73 /74 /50 /i255 /79 /83 /55 /i255 /79 /80 /79 /78 /123 /112 /112 /64 /i255 /63/73 /64 /125 /i255 /73 /52 /75 /57 /73 /54 /55 /i255 /126 /127 /128 /129 /130 /131 /132 /128 /131 /133 /127 /134 /135 /i255 /137 /138 /134 /135 /133 /134 /139 /140 /141 /142 /i255 /143 /131 /144 /i255 /145 /129 /130 /135 /130 /146 /147 /i255 /148 /140 /133 /147 /130 /141 /149 /i255 /150 /141 /141 /140 /138 /134 /139 /140 /141 /i255 /151 /130 /147 /131 /127 /130 /128 /131 /142 /i255 /152 /153 /154 /i255 /155 /140/156/130/141 /149 /i255 /143/131 /127 /132 /132 /131 /142 /155 /129 /134 /127/135 /132 /147 /131 /140 /141 /142 /i255 /155 /129 /134 /127 /135 /132 /147 /131 /140 /141 /i255 /155 /140 /133 /141 /131 /157 /142 /i255 /143 /140 /133 /131 /129 /i255 /155 /134 /127 /140 /135 /130 /141 /134 /i255 /122 /63 /64 /54 /52 /63 /i255 /56 /89 /59 /52 /i255 /158 /55 /i255 /79 /80 /79 /78 /123 /112 /112 /64 /i255 /63/73 /64 /125 /55 /i255 /126 /127 /128 /129 /134 /132 /140 /135 /140 /149 /130 /128 /134 /135 /i255/159/140/127 /160 /i255 /145 /135 /134 /141 /142 /i255 /155 /140 /135 /135 /132 /149 /132 /i255 /140 /161 /i255 /155 /129 /134 /127 /135 /132 /147 /131 /140 /141 /142 /i255 /145 /127 /140 /162 /132 /128 /131 /i255 /163 /153 /164 /i255 /165 /132 /166 /i255 /155 /140 /141 /147 /131 /127 /133 /128 /139 /140 /141 /142 /i255 /155 /129 /134/127 /135 /132 /147 /131 /140 /141 /142 /155 /129 /134 /127/135 /132 /147 /131 /140 /141 /i255 /155 /140 /133 /141 /131 /157 /142 /i255 /143 /140 /133 /131 /129 /i255 /155 /134 /127 /140 /135 /130 /141 /134 /i255 /122 /63 /64 /54 /52 /63 /i255 /56 /89 /50 /49 /i255 /79 /80 /79 /78 /123 /i255 /100 /58 /52 /i255 /63 /57 /62 /89/76/52/59/54 /64 /90 /57 /59 /i255 /88 /64 /53 /i255 /53 /89 /77/76/74/167 /52 /63 /i255 /74 /59 /i255 /64 /59 /90 /62 /74 /75 /64 /90 /57 /59 /i255 /57 /104 /i255 /64 /59 /i255 /64 /75 /75 /50 /74 /62 /64 /90 /57 /59 /i255 /54 /57 /i255 /54 /58 /52 /i255 /48 /57 /89 /54 /58 /i255 /102 /64 /73 /57 /50 /74 /59 /64 /i255 /106 /52 /75 /64 /73 /54/76/52/59/54 /i255 /57 /104 /95 /59 /51 /74 /73 /57 /59/76/52/59 /54/64 /50 /i255 /48 /52 /73 /51 /74 /62 /52 /53 /112 /97 /89 /73 /52 /64 /89 /i255 /57 /104 /i255 /102 /57 /64 /53 /54 /64 /50 /i255/86/64/59 /64 /66 /52/76/52/59 /54 /i255 /122 /106 /95 /48 /112 /97 /102/86/123/65 /i255/96/52/i255 /89 /59 /63 /52 /73 /53 /54 /64 /59 /63 /i255 /54 /58 /64 /54 /i255 /75 /89 /77 /50 /74 /62 /i255 /59 /57 /90 /62 /52/i255 /57 /104 /i255 /64 /59 /64 /75 /75 /50 /74 /62 /64 /90 /57 /59 /i255 /74 /63/52 /59 /90 /168 /52 /63 /i255 /64 /53 /i255 /106 /95 /48 /112 /97 /102/86/i255/73 /52 /104 /52 /73 /52 /59 /62 /52 /i255 /59 /89/76/77/52 /73 /i255 /121 /169 /95 /112/86/107/113/86/112/80 /97 /56 /79 /95 /i255 /58 /64 /53 /i255 /59 /57 /88 /i255 /57 /62 /62 /89 /73 /73 /52 /63 /65 /i255 /116 /89 /73 /i255 /57/117/62/52 /i255 /58 /64/53 /i255 /77 /52 /52 /59 /i255 /74 /59 /i255 /62 /57 /59 /53 /89 /50 /54 /64 /90 /57 /59 /i255 /88 /74 /54 /58 /i255 /64 /59 /63 /i255 /75 /73 /57 /51 /74 /63 /52 /63 /i255 /75 /73 /74 /57 /73 /i255 /119 /75 /73 /52 /112 /62 /57 /57 /73 /63 /74 /59 /64 /90 /57 /59 /120 /i255 /64 /59 /90 /62 /74 /75 /64 /54 /57 /73 /49 /i255 /63 /89 /52 /i255 /63 /74 /50 /74 /66 /52/59 /62 /52 /i255 /73 /52 /51 /74 /52 /88 /62 /57/76/76/52/59 /54 /53 /i255 /54 /57/i255 /100 /52 /73 /73 /64 /62 /57 /59 /i255 /102 /57 /59 /53 /89 /50 /54 /64 /59 /54 /53 /55 /i255 /118 /59 /62 /65 /i255 /64 /59 /63 /i255 /54 /58 /52 /i255 /102 /57 /50 /50 /52 /66 /52 /i255 /57 /104 /i255 /102 /58 /64 /73 /50 /52 /53 /54 /57 /59 /i255 /53 /74 /59 /62 /52 /i255/86/64/73 /62 /58 /i255 /79 /80 /79 /78 /i255 /104 /57 /73 /i255 /64 /i255 /75 /73 /57 /94 /52 /62 /54/i255 /74 /63 /52 /59 /90 /168 /52 /63 /i255 /64 /53 /119 /102 /57/76/74/59 /66 /i255 /48 /54 /73 /52/52 /54 /i255 /102 /57/76/76/57/59 /53 /120 /i255 /64 /59 /63 /170 /57 /73 /i255 /119 /48 /54 /65 /i255 /85 /58 /74 /50 /74 /75 /i255 /121 /57 /89 /53 /74 /59 /66 /i255 /106 /74 /53 /54 /73 /74 /62 /54 /120 /65 /i255/96/52/i255 /64 /62 /62 /52 /75 /54 /52 /63 /i255 /57 /59 /i255 /56 /89 /50 /49 /i255 /81 /55 /i255 /79 /80 /79 /78 /i255 /122 /53 /52 /52 /i255 /57 /89 /73 /i255/64 /167 /64 /62 /58 /52 /63 /50 /52 /167 /52 /73 /53 /123 /i255 /64 /i255 /73 /52 /51 /74/53 /52 /63 /i255 /63 /73 /64 /125 /i255 /75 /50 /64 /59 /i255 /64 /53 /i255 /168 /59 /64 /50 /i255 /104 /57 /73 /i255 /54 /58 /52 /i255 /145 /135 /134 /141 /i255 /161 /140 /127 /i255 /126 /127 /128 /129 /134 /132 /140 /135 /140 /149 /130 /128 /134 /135 /i255/171/140/141 /130 /131 /140 /127 /130 /141 /149 /142 /i255 /155 /140/156/130/141 /149 /i255 /143 /131 /127 /132 /132 /131 /i255 /155 /140/156/156/140/141 /147 /142 /i255 /155 /140 /135 /135 /132 /149 /132 /i255 /140 /161 /155 /129 /134 /127 /135 /132 /147 /131 /140 /141 /142 /i255 /155/129 /134 /127 /135 /132 /147 /131 /140 /141 /142 /i255 /155 /129 /134 /127 /135 /132 /147 /131 /140 /141 /i255 /155 /140 /133 /141 /131 /157 /142 /i255 /143 /140 /133 /131 /129 /i255 /102 /64 /73 /57 /50 /74 /59 /64 /55 /i255 /88 /58 /74 /62 /58 /i255 /88 /52 /i255 /73 /52 /51 /74 /52 /88 /52 /63 /i255 /104 /57 /73 /i255 /75 /73 /57 /75 /57 /53 /52 /63 /i255 /66 /52 /57 /54 /52 /62 /58 /59/74 /62 /64 /50 /74 /59 /53 /54 /73 /89/76/52/59 /54 /64 /90/57 /59 /i255 /74 /59 /53 /54 /64 /50 /50 /64 /90 /57 /59 /53 /i255 /64 /54 /i255 /54 /58 /52 /i255 /75 /73 /57 /94 /52 /62 /54 /i255 /53 /74 /54 /52 /65 /i255 /85 /52 /73 /i255 /54 /58 /52 /i255 /75 /73 /57 /94 /52/62 /54 /i255 /75 /52 /73/76/74/54 /i255 /64 /75 /75 /50 /74 /62 /64 /90 /57 /59 /55 /i255 /54 /58 /52 /i255 /75 /73 /57 /94 /52 /62 /54 /i255 /74 /53 /i255 /63 /52 /53 /62 /73 /74 /77 /52 /63 /i255 /64 /53 /i255 /52 /64 /73 /50 /49 /i255 /53 /74 /54 /52 /i255 /88 /57 /73 /103 /i255 /54 /57 /i255 /52 /59 /64 /77 /50 /52 /i255 /63 /52/76/57/50 /74 /90 /57 /59 /i255 /57 /104 /i255/64 /59 /i255 /52 /172 /74 /53 /90 /59 /66 /53 /54 /73 /89 /62 /54 /89 /73 /52 /i255 /64 /59 /63/i255 /64 /53 /53 /57 /62 /74 /64 /54 /52 /63 /i255 /75 /64 /51 /74 /59 /66 /55 /i255 /64 /73 /62 /58 /52 /57 /50 /57 /66 /74 /62 /64 /50 /i255 /53 /74 /54 /52 /i255 /74 /59 /51 /52 /53 /90 /66 /64 /90 /57 /59 /i255 /64 /59 /63 /i255 /73 /52 /62 /57 /51 /52 /73 /49 /55 /i255 /64 /59 /63 /i255 /74 /59 /53 /54 /64 /50 /50 /64 /90 /57 /59 /i255 /57 /104 /i255 /54 /52 /53 /54 /i255/75 /74 /50 /52 /53 /i255 /104 /57 /73 /i255 /64 /75 /73 /57 /75 /57 /53 /52 /63 /i255 /53 /54 /89 /63 /52 /59 /54 /i255 /58 /57 /89 /53 /74 /59 /66 /i255 /75 /73 /57 /94 /52 /62 /54 /65 /i255 /100 /58 /52 /i255 /54 /57 /54 /64 /50 /i255 /63 /74 /53 /54 /89 /73 /77 /52 /63 /i255 /64 /73 /52 /64 /i255 /74 /53 /i255 /83 /65 /173 /i255 /64 /62 /73 /52 /53 /i255 /104 /57 /73 /i255 /64 /i255 /48 /54 /57 /73/76/88/64 /54 /52 /73 /i255 /75 /52 /73/76/74/54 /65 /i255 /100 /58 /52 /73 /52 /i255 /64 /73 /52 /i255 /59 /57 /88 /52 /54 /50 /64 /59 /63 /i255 /74/76/75/64 /62 /54 /53 /65 /i255 /100 /58 /52 /i255 /75 /73 /57 /94 /52 /62 /54 /i255 /64 /63 /63 /73 /52 /53 /53 /i255 /62 /57/76/75/73 /74 /53 /52 /53 /i255 /158 /83 /i255 /174 /i255 /158 /158 /i255 /48 /54 /65 /i255 /85 /58 /74 /50 /74 /75 /i255 /48 /54 /65 /55 /i255 /124 /64 /59 /63 /52 /73 /58 /57 /73 /53 /54 /i255 /48 /54 /65 /55 /i255 /64 /59 /63 /i255 /83 /80 /173 /i255 /102 /57/76/74/59 /66 /i255 /48 /54 /65 /i255 /74 /59 /102 /58 /64 /73 /50 /52 /53 /54 /57 /59 /65 /i255 /100 /58 /52 /i255 /48 /54 /64 /54 /52 /i255 /121 /74 /53 /54 /57 /73 /74 /62 /i255 /85 /73 /52 /53 /52 /73 /51 /64 /90 /57 /59 /i255 /116/117/62/52 /i255 /122 /48 /121 /85 /116 /123 /i255 /74 /53 /i255 /75 /73 /57 /51 /74 /63 /74 /59 /66 /i255 /62 /57/76/76/52/59 /54 /53 /i255 /54 /57 /i255 /100 /52 /73 /73 /64 /62 /57 /59 /i255 /102 /57 /59 /53 /89 /50 /54 /64 /59 /54 /53 /55 /i255 /118 /59 /62 /65 /i255 /64 /59 /63 /i255 /54 /58 /52 /i255 /102 /57 /50 /50 /52 /66 /52 /57 /104 /i255 /102 /58 /64 /73 /50 /52 /53 /54 /57 /59 /i255 /54 /58 /73 /57 /89 /66 /58 /i255 /54 /58 /52 /i255 /106 /95 /48 /112 /97 /102/86/i255/74 /59 /i255 /64 /62 /62 /57 /73 /63 /64 /59 /62 /52 /i255 /88 /74 /54 /58 /i255 /54 /58 /52 /i255 /48 /57 /89 /54 /58 /i255 /102 /64 /73 /57 /50 /74 /59 /64 /i255 /102 /57 /64 /53 /54 /64 /50 /i255 /113 /57 /59 /52 /i255/86/64/59 /64 /66 /52/76/52/59 /54 /i255 /107 /62 /54 /i255 /57 /104 /i255 /83 /158 /175 /173 /55 /176 /177 /178 /179 /177 /178 /180 /181 /i255 /183 /184 /185 /183 /184 /i255 /186/187/188 /189 /185 /i255 /190 /191 /192/193/189 /194 /195 /i255 /178 /184 /196 /i255 /197 /189 /198 /i255 /199 /192 /200 /201 /195 /191 /202 /194 /195 /203 /192 /200 /i255 /204 /i255 /199 /205 /199/206/207 /208 /209/206/210 /199/187/i255/190 /191 /192/193/189 /194 /195 /i255 /188 /189 /211 /203 /189 /198 /i255 /212 /192 /191/213/i255/214 /200 /215 /i255 /186 /191 /194 /216 /214 /189 /192 /217 /192/218 /219/i255 /190 /217 /214 /200 /i255 /204 /i255/220/192/191 /191 /189 /217 /217 /181 /i255 /221 /214 /202 /191 /214 /i255 /221 /189 /189 /i255 /204 /i255/222/202/195 /217 /192 /192 /223 /214 /224 /192 /202 /195 /185 /224 /217 /214 /200 /223 /178 /177 /179 /0/1/i255/0/3/4/5/6/4/6/i255/7/8/9/10/11/12/i255/13/0/14/9/15/16/5/0/i255/13/9/6/4/i255/17/16/11/15/4/i255/18/19/20/i255/13/12/0/21/11/4/14/i255/22/23/24/20/i255/11/12/4/i255/25/26/9/15/16/27/16/4/1/i255/0/5/6/i255/26/14/9/27/4/6/10/14/4/1/i255/9/28/i255/11/12/4/i255/8/9/10/11/12/i255/13/0/14/9/15/16/5/0/i255/13/9/0/1/11/0/15 /29/9/5/4/i255/30/0/5/0/31/4/3/4/5/11/i255/26/14/9/31/14/0/3/32/i255/0/5/6/i255/11/12/4/i255/33/23/23/34/i255/30/4/3/9/14/0/5/6/10/3/i255/9/28/i255/35/31/14/4/4/3/4/5/11/i255/36/4/11/37/4/4/5/i255/9/10/14/i255/38/39/27/4/1/i255/27/9/5/27/4/14/5/16/5/31 /16/3/21/15/4/3/4/5/11/0/40/9/5/i255/9/28/i255/11/12/4/i255/8/9/10/11/12/i255/13/0/14/9/15/16/5/0/i255/13/9/0/1/11/0/15/i255/30/0/5/0/31/4/3/4/5/11/i255/26/14/9/31/14/0/3/41/i255/13/9/5/1/10/15/11/0/40/9/5/i255/37/16/11/12/i255/11/12/4/i255/8/42/26/38/i255/16/1/i255/5/9/11/i255/0 /1/10/36/1/40/11/10/40/9/5/i255/28/9/14/i255/27/9/5/1/10/15/11/0/40/9/5/i255/37/16/11/12/i255/17/14/16/36/0/15/i255/42/16/1/11/9/14/16/27/i255/26/14/4/1/4/14/43/0/40/9/5/i255/38/39/27/4/1/20/i255/9/11/12/4/14/i255/44/0/40/43/4/i255/35/3/4/14/16/27/0/5/i255/11/14/16/36/4/1/i255/16/5/27/15/10/6/16/5/31/i255/11/12/9/1/4 /37/16/11/12/i255/1/11/0/11/4/i255/14/4/27/9/31/5/16/40/9/5/20/i255/15/9/27/0/15/i255/31/9/43/4/14/5/3/4/5/11/1/20/i255/9/14/i255/11/12/4/i255/21/10/36/15/16/27/41 /i255 /17/12/4/i255/21/14/9/45/4/27/11/i255/0 /14/4/0/i255/12/0/1/i255/5/9/11/i255/36/4/4/5/i255/21/14/4/43/16/9/10/1/15/46/i255/1/10/14/43/4/46/4/6/i255/28/9/14/i255/27/10/15/11/10/14/0/15/i255/14/4/1/9/10/14/27/4/1/47/12/16/1/11/9/14/16/27/i255/21/14/9/21/4/14/40/4/1/41/i255/17/12/4/i255/21/14/9/45/4/27/11/i255/0/14/4/0/i255/16/1 /15/9/27/0/11/4/6/i255/37/16/11/12/16/5/i255/11/12/4/i255/36/9/10/5/6/0/14/46/i255/9/28/i255/11/12/4/i255/44/0/40/9/5/0/15/i255/48/4/31/16/1/11/4/14/49/4/15/16/31/16/36/15/4/i255/21/14/9/21/9/1/4/6/i255/4/50/21/0/5/1/16/9/5/i255/0/14/4/0/i255/9/28/i255/11/12/4/i255/13/12/0/14/15/4/1/11/9/5/i255/42/16/1/11/9/14/16/27 /51/16/1/11/14/16/27/11/20/i255/0/i255/8/16/31/5/16/52/27/0/5/11/i255/8/16/11/4/41/i255/17/12/4/i255/21/14/9/45/4/27/11/i255/0/14/4/0/i255/16/1/i255/0/15/1/9/i255/15/9/27/0/11/4/6/i255/0/6/45/0/27/4/5/11/i255/11/9/i255/11/12/4/i255/44/0/40/9/5/0/15/i255/48/4/31/16/1/11/4/14/49/15/16/1/11/4/6/i255/0/5/6/i255/44/0/40/9/5/0/15 /42/16/1/11/9/14/16/27/i255/53/0/5/6/3/0/14/54/i255/7/44/42/53/24/49/6/4/1/16/31/5/0/11/4/6/i255/13/12/0/14/15/4/1/11/9/5/i255/42/16/1/11/9/14/16/27/i255/51/16/1/11/14/16/27/11/20/i255/0/i255/55/4/9/31/14/0/21/12/16/27/i255/35/14/4/0/i255/9/28/i255/26/0/14/40/27/10/15/0/14/i255/13/9/5/27/4/14/5/i255/7/55/35/26/13/24/41 /i255 /56/57/58/59/60/61/62/58/61/63/57/64/65 /i255/67/68/64/65/63/64/69/70/71/72/i255/73/61/74/i255/75/59/60/65/60/76/77/i255/78/70/63/77/60/71/79/i255/80/71/71/70/68/64/69/70/71/i255/81/60/77/61/57/60/58/61/72/i255/82/83/84/i255/85/70/86/60/71/79/i255/73/61/57/62/62/61/72/i255/85/59/64/57/65/62/77/61/70/71/72/i255/85/59/64/57/65/62/77/61/70/71/i255/85/70/63/71/61/87/72 /73/70/63/61/59/i255/85/64/57/70/65/60/71/64 /i255 /17/12/4/i255/56/57/58/59/60/61/62/58/61/63/57/64/65/i255/67/68/64/65/63/64/69/70/71/i255/14/4/21/9/14/11/i255/16/5/27/15/10/6/4/1/i255/0/i255/36/14/16/4/28/i255/12/16/1/11/9/14/46/i255/9/28/i255/33/88/34/i255/13/9/3/16/5/31/i255/8/11/14/4/4/11/20/i255/16/5/27/15/10/6/16/5/31/i255/36/9/11/12/i255/11/12/4/i255/27/10/14/14/4/5/11 /36/10/16/15/6/16/5/31/i255/27/9/5/1/11/14/10/27/11/4/6/i255/16/5/i255/33/23/34/18/i255/28/9/14/i255/11/12/4/i255/89/9/10/5/31/i255/90/9/3/4/5/91/1/i255/13/12/14/16/1/40/0/5/i255/35/1/1/9/27/16/0/40/9/5/i255/7/89/90/13/35/24/i255/27/12/0/21/11/4/14/i255/9/28/i255/13/12/0/14/15/4/1/11/9/5/20/i255/0/1/i255/37/4/15/15 /0/1/i255/11/12/4/i255/21/0/14/27/4/15/i255/16/11/1/4/15/28/20/i255/37/12/16/27/12/i255/37/0/1/i255/15/0/16/6/i255/9/10/11/i255/0/1/i255/11/12/4/i255/1/4/27/9/5/6/i255/9/39/27/16/0/15/i255/3/10/5/16/27/16/21/0/15/i255/27/4/3/4/11/4/14/46/i255/28/9/14/i255/11/12/4/i255/13/16/11/46/i255/9/28/i255/13/12/0/14/15/4/1/11/9/5 /36/4/31/16/5/5/16/5/31/i255/16/5/i255/33/92/23/18/41/i255/33/88/34/i255/13/9/3/16/5/31/i255/8/11/14/4/4/11/i255/36/16/1/4/27/11/1/i255/11/12/4/i255/3/16/6/6/15/4/i255/9/28/i255/37/12/0/11/i255/37/0/1/i255/9/5/27/4/i255/11/12/4/i255/3/10/5/16/27/16/21/0/15/i255/27/4/3/4/11/4/14/46/41/i255/17/12/4/i255/14/4/21/9/14/11 /0/15/1/9/i255/0/21/21/4/5/6/1/i255/0/i255/1/4/21/0/14/0/11/4/i255/93/94/53/i255/42/16/1/11/9/14/16/27/i255/26/14/4/1/4/14/43/0/40/9/5/i255/48/4/1/4/0/14/27/12/i255/14/4/21/9/14/11/20/i255/85/70/86/60/71/79/i255/73/61/57/62/62/61/i255/95/96/85/56/i255/97/82/98/84/99/100/72/i255/82/83/84/i255/85/70/86/60/71/79 /73/61/57/62/62/61/72/i255/85/59/64/57/65/62/77/61/70/71/72/i255/73/85/i255/7/6/0/11/4/6/i255/30/0/46/i255/101/88/101/102/24/41 /i255 /93/0/1/4/6/i255/9/5/i255/9/10/14/i255/14/4/43/16/4/37/i255/9/28/i255/11/12/4/i255/6/14/0/103/i255/56/57/58/59/60/61/62/58/61/63/57/64/65/i255/67/68/64/65/63/64/69/70/71/i255/14/4/21/9/14/11/20/i255/9/10/14/i255/9/39/27/4/i255/52/5/6/1/i255/11/12/0/11/i255/11/12/4/i255/13/9/3/16/5/31/i255/8/11/14/4/4/11/i255/89/90/13/35 /36/10/16/15/6/16/5/31/i255/0/11/i255/33/88/34/i255/13/9/3/16/5/31/i255/8/11/14/4/4/11/i255/16/1/i255/16/5/6/16/43/16/6/10/0/15/15/46/i255/4/15/16/31/16/36/15/4/i255/28/9/14/i255/15/16/1/40/5/31/i255/16/5/i255/11/12/4/i255/44/0/40/9/5/0/15/i255/48/4/31/16/1/11/4/14/i255/9/28/i255/42/16/1/11/9/14/16/27/i255/26/15/0/27/4/1/i255/0/11/i255/11/12/4 /15/9/27/0/15/i255/15/4/43/4/15/i255/9/28/i255/1/16/31/5/16/52/27/0/5/27/4/i255/10/5/6/4/14/i255/13/14/16/11/4/14/16/9/5/i255/35/20/i255/37/16/11/12/i255/0/21/21/15/16/27/0/36/15/4/i255/0/14/4/0/1/i255/9/28/i255/1/16/31/5/16/52/27/0/5/27/4/i255/16/5/27/15/10/6/16/5/31/i255/8/9/27/16/0/15/i255/42/16/1/11/9/14/46/20/i255/104/11/12/5/16/27 /42/4/14/16/11/0/31/4/105/i255/93/15/0/27/54/20/i255/8/9/27/16/0/15/i255/42/16/1/11/9/14/46/105/i255/13/16/43/16/15/i255/48/16/31/12/11/1/20/i255/0/5/6/i255/38/11/12/4/14/105/i255/90/9/3/4/5/91/1/i255/42/16/1/11/9/14/46/41/i255/17/12/4/i255/14/4/27/9/3/3/4/5/6/4/6/i255/21/4/14/16/9/6/i255/9/28/i255/1/16/31/5/16/52/27/0/5/27/4 /37/9/10/15/6/i255/36/4/i255/28/14/9/3/i255/33/23/34/18/i255/11/9/i255/33/23/92/102/i255/7/16/5/27/9/14/21/9/14/0/40/5/31/i255/11/12/4/i255/44/0/40/9/5/0/15/i255/48/4/31/16/1/11/4/14/i255/21/14/9/31/14/0/3/91/1/i255/52/103/46/49/46/4/0/14/i255/14/10/15/4/24/41/i255/17/12/4/i255/21/14/9/21/4/14/11/46/i255/16/1/i255/0/15/1/9 /4/15/16/31/16/36/15/4/i255/0/11/i255/11/12/4/i255/15/9/27/0/15/i255/15/4/43/4/15/i255/9/28/i255/1/16/31/5/16/52/27/0/5/27/4/i255/10/5/6/4/14/i255/13/14/16/11/4/14/16/9/5/i255/93/i255/16/5/i255/0/15/15/i255/11/12/4/i255/1/0/3/4/i255/0/14/4/0/1/i255/9/28/i255/1/16/31/5/16/52/27/0/5/27/4/i255/28/9/14/i255/16/11/1/i255/0/1/1/9/27/16/0/40/9/5/1 /37/16/11/12/i255/13/12/14/16/1/40/5/4/i255/38/41/i255/106/0/27/54/1/9/5/i255/28/14/9/3/i255/33/23/34/34/i255/11/9/i255/33/23/92/102/41/i255/17/12/4/i255/36/10/16/15/6/16/5/31/i255/37/9/10/15/6/i255/5/9/11/i255/36/4/i255/4/15/16/31/16/36/15/4/i255/10/5/6/4/14/i255/13/14/16/11/4/14/16/9/5/i255/93/i255/28/9/14/i255/0/1/1/9/27/16/0/40/9/5/1 /37/16/11/12/i255/13/9/14/4/107/0/i255/8/27/9/107/i255/108/16/5/31/i255/9/14/i255/8/4/21/40/3/0/i255/13/15/0/14/54/20/i255/0/1/i255/11/12/4/14/4/i255/0/14/4/i255/0/15/3/9/1/11/i255/27/4/14/11/0/16/5/15/46/i255/9/11/12/4/14/i255/21/14/9/21/4/14/40/4/1/i255/37/16/11/12/i255/37/12/16/27/12/i255/11/12/4/46/i255/0/14/4/i255/3/9/14/4 /1/11/14/9/5/31/15/46/i255/0/1/1/9/27/16/0/11/4/6/i255/0/5/6/i255/37/12/16/27/12/i255/37/9/10/15/6/i255/36/4/107/4/14/i255/14/4/21/14/4/1/4/5/11/i255/11/12/4/16/14/i255/1/16/31/5/16/52/27/0/5/11/i255/0/27/27/9/3/21/15/16/1/12/3/4/5/11/1/41 /i255 /35/1/i255/11/12/4/i255/13/9/3/16/5/31/i255/8/11/14/4/4/11/i255/89/90/13/35/i255/36/10/16/15/6/16/5/31/i255/3/4/4/11/1/i255/11/12/4/i255/44/0/40/9/5/0/15/i255/48/4/31/16/1/11/4/14/i255/4/15/16/31/16/36/16/15/16/11/46/i255/27/14/16/11/4/14/16/0/i255/16/11/i255/16/1/i255/27/9/5/1/16/6/4/14/4/6/i255/0/i255/25/8/16/31/5/16/52/27/0/5/11 /8/16/11/4/32/i255/28/9/14/i255/11/12/4/i255/21/10/14/21/9/1/4/1/i255/9/28/i255/11/12/4/i255/13/9/0/1/11/0/15/i255/30/0/5/0/31/4/3/4/5/11/i255/26/14/9/31/14/0/3/41/i255/17/12/4/i255/21/14/9/21/9/1/4/6/i255/6/4/3/9/15/16/40/9/5/i255/9/28/i255/13/9/3/16/5/31/i255/8/11/14/4/4/11/i255/89/90/13/35 /36/10/16/15/6/16/5/31/i255/37/9/10/15/6/i255/27/9/5/1/40/11/10/11/4/i255/0/5/i255/16/14/14/4/11/14/16/4/43/0/36/15/4/i255/15/9/1/1/i255/9/28/i255/11/12/4/i255/8/16/31/5/16/52/27/0/5/11/i255/8/16/11/4/41 /i255 /13/9/0/1/11/0/15/i255/21/9/15/16/27/16/4/1/i255/14/4/15/0/11/4/6/i255/11/9/i255/8/16/31/5/16/52/27/0/5/11/i255/8/16/11/4/1/i255/0/14/4/i255/15/9/27/0/11/4/6/i255/16/5/i255/13/12/0/21/11/4/14/i255/22/i255/9/28/i255/11/12/4/i255/26/14/9/31/14/0/3/i255/51/9/27/10/3/4/5/11/i255/1/4/27/40/9/5/i255/40/11/15/4/6 /25/55/10/16/6/4/15/16/5/4/1/i255/28/9/14/i255/104/43/0/15/10/0/40/9/5/i255/9/28/i255/35/15/15/i255/26/14/9/45/4/27/11/1/32/105/i255/i255/25/16/5/i255/14/4/43/16/4/37/i255/0/5/6/i255/27/4/14/40/52/27/0/40/9/5/i255/9/28/i255/21/4/14/3/16/11/i255/0/21/21/15/16/27/0/40/9/5/1/i255/16/5/i255/11/12/4/i255/27/9/0/1/11/0/15/i255/109/9/5/4/20 /11/12/4/i255/110/51/104/8/49/93/13/30/111/i255/37/16/15/15/i255/36/4/i255/31/10/16/6/4/6/i255/36/46/i255/11/12/4/i255/28/9/15/15/9/37/16/5/31/i255/31/4/5/4/14/0/15/i255/27/9/5/1/16/6/4/14/0/40/9/5/1/105/112/23/24/i255/11/12/4/i255/4/50/11/4/5/11/i255/0/5/6/i255/1/16/31/5/16/52/27/0/5/27/4/i255/9/28/i255/16/3/21/0/27/11/i255/9/5 /11/12/4/i255/28/9/15/15/9/37/16/5/31/i255/0/1/21/4/27/11/1/i255/9/28/i255/113/10/0/15/16/11/46/i255/9/14/i255/113/10/0/5/40/11/46/i255/9/28/i255/11/12/4/1/4/i255/43/0/15/10/0/36/15/4/i255/27/9/0/1/11/0/15/i255/14/4/1/9/10/14/27/4/1/112/16/16/16/24/i255/12/16/1/11/9/14/16/27/i255/9/14/i255/0/14/27/12/0/4/9/15/9/31/16/27/0/15 /14/4/1/9/10/14/27/4/1/114/16/14/14/4/11/14/16/4/43/0/36/15/4/i255/15/9/1/1/i255/9/28/i255/1/16/11/4/1/i255/16/6/4/5/40/52/4/6/i255/0/1/i255/1/16/31/5/16/52/27/0/5/11/i255/36/46/i255/11/12/4/i255/8/41/13/41/i255/115/5/1/40/11/10/11/4/i255/9/28/i255/35/14/27/12/0/4/9/15/9/31/46/i255/0/5/6/i255/35/5/11/12/14/9/21/9/15/9/31/46 /9/14/i255/11/12/4/i255/8/41/13/41/i255/51/4/21/0/14/11/3/4/5/11/i255/9/28/i255/35/14/27/12/16/43/4/1/i255/0/5/6/i255/42/16/1/11/9/14/46/i255/37/16/11/12/9/10/11/i255/14/4/0/1/9/5/0/36/15/4/i255/9/21/21/9/14/11/10/5/16/11/46/i255/28/9/14/i255/21/14/9/28/4/1/1/16/9/5/0/15/i255/4/50/0/3/16/5/0/40/9/5 /0/5/6/47/9/14/i255/4/50/27/0/43/0/40/9/5/20/i255/9/14/i255/21/14/4/1/4/14/43/0/40/9/5/41/32 /i255 /38/10/14/i255/9/39/27/4/i255/14/4/27/9/3/3/4/5/6/1/i255/11/12/0/11/i255/21/14/9/28/4/1/1/16/9/5/0/15/i255/4/50/0/3/16/5/0/40/9/5/i255/9/14/i255/21/14/4/1/4/14/43/0/40/9/5/i255/9/28/i255/11/12/4/i255/8/16/31/5/16/52/27/0/5/11/i255/8/16/11/4/i255/9/27/27/10/14/41/i255/116/117/118/i255/120/121/122/123 /118/123/122/120/124/124/123/125/126/127/i255/128/127/i255/128/i255/129/123/118/124/130/131/i255/122/120/125/126/130/132/120/125/i255/131/133/128/131/i255/128/i255/129/118/120/134/123/127/127/130/120/125/128/135/i255/123/136/128/124/130/125/128/132/120/125/i255/120/118/i255/129/118/123/127/123/118/137/128/132/120/125/i255/131/118/123/128/131/124/123/125/131/i255/129/135/128/125/i255/138/123/i255/129/118/120/137/130/126/123/126 /134/120/118/i255/118/123/137/130/123/139/i255/128/125/126/i255/128/129/129/118/120/137/128/135/i255/138/140/i255/120/117/118/i255/120/121/122/123/i255/128/125/126/i255/141/142/143/144/145/146/147/148 /i255 /17/12/4/i255/21/14/9/28/4/1/1/16/9/5/0/15/i255/4/50/0/3/16/5/0/40/9/5/i255/9/14/i255/21/14/4/1/4/14/43/0/40/9/5/i255/11/14/4/0/11/3/4/5/11/i255/21/15/0/5/i255/1/12/9/10/15/6/i255/36/4/i255/27/9/5/6/10/27/11/4/6/i255/36/46/i255/16/5/6/16/43/16/6/10/0/15/1/i255/11/12/0/11/i255/3/4/4/11/i255/11/12/4 /8/4/27/14/4/11/0/14/46/i255/9/28/i255/11/12/4/i255/115/5/11/4/14/16/9/14/149/1/i255/26/14/9/28/4/1/1/16/9/5/0/15/i255/150/10/0/15/16/52/27/0/40/9/5/1/i255/8/11/0/5/6/0/14/6/1/i255/16/5/i255/0/14/27/12/4/9/15/9/31/46/20/i255/12/16/1/11/9/14/46/20/i255/0/14/27/12/16/11/4/27/11/10/14/0/15/i255/12/16/1/11/9/14/46/20/i255/9/14 /12/16/1/11/9/14/16/27/i255/0/14/27/12/16/11/4/27/11/10/14/4/20/i255/0/1/i255/0/21/21/14/9/21/14/16/0/11/4/41 /i255 /17/12/4/i255/21/14/9/28/4/1/1/16/9/5/0/15/i255/4/50/0/3/16/5/0/40/9/5/i255/9/14/i255/21/14/4/1/4/14/43/0/40/9/5/i255/11 /14/4/0/11/3/4/5/11/i255/21/15/0/5/i255/1/12/9/10/15/6/i255/16/5/27/15/10/6/4/i255/0/i255/27/9/21/46/i255/9/28/i255/11/12/4/i255/0/21/21/15/16/27/0/40/9/5/i255/28/9/14/20/i255/0/5/6 /0/21/21/14/9/43/0/15/i255/9/28/20/i255/11/12/4/i255/21/14/9/21/9/1/4/6/i255/6/4/3/9/15/16/40/9/5/i255/36/46/i255/11/12/4/i255/13/12/0/14/15/4/1/11/9/5/i255/93/9/0/14/6/i255/9/28/i255/35/14/27/12/16/11/4/27/11/10/14/0/15/i255/48/4/43/16/4/37/41 /i255 /151/152/153/154/152/153/155/156/i255/158/159/160/158/159/i255/161/162/163 /164/160/i255/165/166/167/168/164/169/170/i255/153/159/171/i255/172/164/173/i255/174/167/175/176/170/166/177/169/170/178/167/175/i255/179/i255/174/180/174/181/182/183/184/181/185/174/162/i255/165/166/167/168/164/169/170/i255/163/164/186/178/164/173/i255/187/167/166/188/i255/189/175/190/i255/161/166/169/191/189/164/167/192/167/193/194/i255/165/192/189/175/i255/179/i255/195/167/166/166/164/192/192/156/i255/196/189/177/166/189/i255/196/164/164/i255/179/i255/197/177/170/192/167/167/198 /189/199/167/177/170/160/199/192/189/175/198 /151/152/154 /0/1/i255/3/4/5/i255/6/7/7/5/3/7/6/5/8/9/10/11/5/i255/11/12/13/13/i255/14/9/15/15/12/3/i255/10/5/i255/9/8/12/6/16/5/16/17/i255/9/11/11/12/18/6/15/19/i255/1/12/7/i255/20/7/5/13/5/7/8/9/21/12/15/i255/12/1/i255/3/4/5/i255/22/6/19/15/6/23/14/9/15/3/i255/22/6/3/5/17/i255/3/4/5/15/i255/20/7/12/20/12/13/5/16 /20/7/12/1/5/13/13/6/12/15/9/11/i255/5/24/9/25/6/15/9/21/12/15/i255/3/7/5/9/3/25/5/15/3/i255/20/11/9/15/i255/25/5/9/13/26/7/5/13/i255/25/9/27/i255/6/15/14/11/26/16/5/i255/10/26/3/i255/9/7/5/i255/15/12/3/i255/11/6/25/6/3/5/16/i255/3/12/28 /16/6/19/6/3/9/11/i255/20/4/12/3/12/19/7/9/20/4/6/14/i255/16/12/14/26/25/5/15/3/9/21/12/15/i255/12/1/i255/3/4/5/i255/10/26/6/11/16/6/15/19/i255/13/26/10/25/6/29/5/16/i255/1/12/7/i255/9/20/20/7/12/8/9/11/i255/20/7/6/12/7/i255/3/12/i255/16/5/25/12/11/6/21/12/15/30/i255/6/16/5/15/21/23/14/9/21/12/15/i255/12/1 /9/15/16/31/12/7/i255/20/7/5/20/9/7/9/21/12/15/i255/12/1/i255/25/5/9/13/26/7/5/16/i255/16/7/9/18/6/15/19/13/i255/12/1/i255/3/4/5/i255/10/26/6/11/16/6/15/19/i255/13/26/10/25/6/29/5/16/i255/1/12/7/i255/9/20/20/7/12/8/9/11/i255/20/7/6/12/7/i255/3/12/i255/16/5/25/12/11/6/21/12/15/30/i255/14/12/25/20/11/5/21/12/15 /12/1/i255/9/i255/22/32/33/34/i255/22/3/9/3/5/18/6/16/5/i255/22/26/7/8/5/27/i255/35/12/7/25/i255/1/12/7/i255/3/4/5/i255/10/26/6/11/16/6/15/19/30/i255/9/i255/18/7/6/29/5/15/i255/4/6/13/3/12/7/27/i255/12/1/i255/3/4/5/i255/36/37/38/39/i255/40/26/6/11/16/6/15/19/i255/20/11/9/14/6/15/19/i255/3/4/5/i255/10/26/6/11/16/6/15/19 /18/6/3/4/6/15/i255/6/3/13/i255/11/12/14/9/11/i255/4/6/13/3/12/7/6/14/i255/14/12/15/3/5/24/3/30/i255/9/15/i255/12/7/9/11/i255/4/6/13/3/12/7/27/i255/20/7/12/41/5/14/3/30/i255/9/15/i255/42/4/6/13/3/12/7/27/i255/4/9/7/8/5/13/3/43/i255/5/8/5/15/3/i255/7/5/11/9/3/5/16/i255/3/12/i255/3/4/5/i255/4/6/13/3/12/7/27/i255/9/15/16 /25/5/25/12/7/6/9/11/6/44/9/21/12/15/i255/12/1/i255/3/4/5/i255/38/12/25/6/15/19/i255/22/3/7/5/5/3/i255/36/37/38/39/i255/10/26/6/11/16/6/15/19/30/i255/6/15/3/5/7/20/7/5/21/8/5/i255/20/9/15/5/11/13/i255/12/7/i255/5/24/4/6/10/6/3/13/30/i255/12/15/11/6/15/5/i255/5/24/4/6/10/6/3/13/30 /20/7/5/13/5/15/3/9/21/12/15/13/i255/3/12/i255/3/4/5/i255/20/26/10/11/6/14/30/i255/16/6/13/13/5/25/6/15/9/21/12/15/i255/12/1/i255/3/4/5/i255/18/7/6/29/5/15/i255/4/6/13/3/12/7/27/i255/3/12/i255/9/14/14/5/20/21/15/19/i255/11/12/14/9/11/i255/7/5/20/12/13/6/3/12/7/6/5/13/17/i255/12/7/i255/12/3/4/5/7/i255/14/7/5/9/21/8/5 /25/5/9/13/26/7/5/13/45 /i255 /46/4/5/i255/48/49/50/51/52/53/54/50/53 /55/49/56/57/i255/58/59/56/57/55/56/60/61/62/i255/7/5/20/12/7/3/i255/63/6/15/14/11/26/16/6/15/19/i255/3/4/5/i255/40/64/65/i255/32/6/13/3/12/7/6/14/i255/33/7/5/13/5/7/8/9/21/12/15/i255/66/5/13/5/9/7/14/4/i255/7/5/20/12/7/3/67/i255/20/7/12/8/6/16/5/16/i255/25/9/27/i255/13/26/68/14/5 /26/20/12/15/i255/7/5/8/6/13/6/12/15/i255/9/15/16/i255/7/5/20/9/14/69/9/19/6/15/19/i255/9/13/i255/9/i255/18/7/6/29/5/15/i255/4/6/13/3/12/7/27/i255/7/5/20/12/7/3/i255/12/1/i255/3/4/5/i255/38/12/25/6/15/19/i255/22/3/7/5/5/3/i255/36/37/38/39/i255/10/26/6/11/16/6/15/19/45/i255/34/26/7/i255/12/68/14/5/i255/14/9/15 /20/7/12/8/6/16/5/i255/9/16/16/6/21/12/15/9/11/i255/14/12/25/25/5/15/3/13/i255/12/15/i255/3/4/5/i255/7/5/20/12/7/3/i255/14/12/15/3/5/15/3/i255/9/13/i255/20/9/7/3/i255/12/1/i255/3/4/5/i255/7/5/8/6/5/18/i255/12/1/i255/3/4/5/i255/20/7/12/20/12/13/5/16/i255/20/7/12/1/5/13/13/6/12/15/9/11 /5/24/9/25/6/15/9/21/12/15/i255/3/7/5/9/3/25/5/15/3/i255/25/5/9/13/26/7/5/13/45/i255/46/4/5/i255/48/49/50/51/52/53/54/50/53/55/49/56/57/i255/58/59/56/57/55/56/60/61/62/i255/7/5/20/12/7/3/70/13/i255/9/20/20/5/15/16/5/16/i255/16/6/19/6/3/9/11/i255/20/4/12/3/12/19/7/9/20/4/6/14/i255/13/26/7/8/5/27/i255/9/15/16 /20/4/12/3/12/i255/13/6/3/5/i255/20/11/9/15/i255/9/15/16/i255/71/12/12/7/i255/20/11/9/15/i255/16/12/14/26/25/5/15/3/9/21/12/15/i255/13/4/12/26/11/16/i255/13/26/68/14/5/i255/9/13/i255/25/5/5/21/15/19/i255/3/4/5/i255/13/3/9/15/16/9/7/16/i255/22/32/33/34/i255/13/21/20/26/11/9/3/5/16/i255/20/9/7/9/25/5/3/5/7/13 /1/12/7/i255/20/4/12/3/12/19/7/9/20/4/6/14/i255/16/12/14/26/25/5/15/3/9/21/12/15/i255/12/1/i255/9/i255/4/6/13/3/12/7/6/14/i255/10/26/6/11/16/6/15/19/45/i255/34/7/6/19/6/15/9/11/i255/25/5/9/13/26/7/5/16/i255/16/7/9/18/6/15/19/13/i255/12/1/i255/3/4/5/i255/38/12/25/6/15/19/i255/22/3/7/5/5/3/i255/36/37/38/39 /10/26/6/11/16/6/15/19/i255/13/4/12/26/11/16/i255/10/5/i255/6/16/5/15/21/23/5/16/i255/12/7/i255/25/5/9/13/26/7/5/16/i255/16/7/9/18/6/15/19/13/i255/25/26/13/3/i255/10/5/i255/20/7/5/20/9/7/5/16/i255/9/15/16/i255/9/20/20/7/12/8/5/16/i255/10/27/i255/12/26/7/i255/12/68/14/5/i255/20/7/6/12/7/i255/3/12/i255/9/15/27 /16/5/25/12/11/6/21/12/15/i255/9/14/21/8/6/21/5/13/45/i255/37/5/i255/18/12/26/11/16/i255/9/11/13/12/i255/7/5/14/12/25/25/5/15/16/i255/7/5/14/12/7/16/6/15/19/i255/3/4/5/i255/38/12/25/6/15/19/i255/22/3/7/5/5/3/i255/36/37/38/39/i255/10/26/6/11/16/6/15/19/i255/12/15/i255/9/i255/22/32/33/34/i255/22/26/7/8/5/27 /35/12/7/25/45 /i255 /46/4/5/i255/22/32/33/34/i255/18/6 /11/11/i255/4/9/8/5/i255/3/4/6/7/3/27/i255/63/72/73/67/i255/16/9/27/13/i255/3/12/i255/7/5/8/6/5/18/i255/9/15/16/i255/14/12/25/25/5/15/3/i255/12/15/i255/3/4/5/i255/16/7/9/74/i255/20/7/12/1/5/13/13/6/12/15/9/11/i255/5/24/9/25/6/15/9/21/12/15/i255/12/7/i255/20/7/5/13/5/7/8/9/21/12/15 /3/7/5/9/3/25/5/15/3/i255/20/11/9/15/i255/26/20/12/15/i255/7/5/14/5/6/20/3/45/i255/0/1/i255/7/5/8/6/13/6/12/15/13/i255/9/7/5/i255/7/5/75/26/5/13/3/5/16/i255/10/9/14/69/i255/3/12/i255/3/4/5/i255/34/18/15/5/7/70/13/31/39/20/20/11/6/14/9/15/3/70/13/i255/14/12/15/13/26/11/21/15/19/i255/20/7/5/13/5/7/8/9/21/12/15 /20/7/12/1/5/13/13/6/12/15/9/11/i255/3/4/5/i255/34/18/15/5/7/31/39/20/20/11/6/14/9/15/3/i255/9/15/16/i255/3/4/5/6/7/i255/14/12/15/13/26/11/21/15/19/i255/20/7/5/13/5/7/8/9/21/12/15/i255/20/7/12/1/5/13/13/6/12/15/9/11/i255/18/6/11/11/i255/9/16/16/7/5/13/13/i255/3/4/5/i255/7/5/75/26/5/13/3/5/16 /7/5/8/6/13/6/12/15/13/i255/18/6/3/4/6/15/i255/3/4/6/7/3/27/i255/63/72/73/67/i255/16/9/27/13/i255/26/20/12/15/i255/7/5/14/5/6/20/3/17/i255/26/15/21/11/i255/3/4/5/i255/23/15/9/11/i255/20/11/9/15/i255/6/13/i255/9/20/20/7/12/8/5/16/i255/10/27/i255/22/32/33/34/45 /i255 /i255 /48/49/50/51/56/54/61/57/61/76/52/50 /56/57/i255/77/61/49/78/i255/79/57/56/62/80/i255/81/61/57/57/54/76/54/i255/61/82/i255/81/51/56/49/57/54/83/53/61/62/80/i255/79/49/61/84/54/50/53/i255/85/86/87/i255/88/54/89/i255/81/61/62/83/53/49/55/50/60/61/62/80/i255/81/51/56/49/57/54/83/53/61/62/80/i255/81/51/56/49/57/54/83/53/61/62/i255/81/61/55/62/53/90/80 /91/61/55/53/51/i255/81/56/49/61/57/52/62/56 /i255 /46/4/5/i255/48/49/50/51/56/54/61/57/61/76/52/50/56/57/i255/77/61/49/78/i255/79/57/56/62/i255/63/9/11/13/12/i255/21/3/11/5/16/i255/18/6/3/4/6/15/i255/3/4/5/i255/16/12/14/26/25/5/15/3/i255/9/13/i255/48/49/50/51/56/54/61/57/61/76/52/50/56/57/i255/92/61/62/52/53/61/49/52/62/76/i255/56/62/93/i255/94/62/59/54/83/60/76/56/60/61/62 /79/57/56/62/67/i255/10/26/6/11/16/13/i255/26/20/12/15/i255/9/15/16/i255/16/5/13/14/7/6/10/5/13/i255/4/12/18/i255/46/5/7/7/9/14/12/15/17/i255/0/15/14/45/i255/9/15/16/i255/3/4/5/i255/38/12/11/11/5/19/5/i255/12/1/i255/38/4/9/7/11/5/13/3/12/15/i255/20/7/12/20/12/13/5/13/i255/3/12/i255/6/25/20/11/5/25/5/15/3/i255/3/4/5 /20/7/5/8/6/12/26/13/11/27/i255/22/32/33/34/i255/7/5/14/12/25/25/5/15/16/5/16/i255/9/15/16/i255/7/5/8/6/5/18/5/16/i255/79/57/56/62/i255/82/61/49/i255/48/49/50/51/56/54/61/57/61/76/52/50/56/57/i255/92/61/62/52/53/61/49/52/62/76/80/i255/81/61/95/52/62/76/i255/91/53/49/54/54/53/i255/81/61/95/95/61/62/83/80 /81/61/57/57/54/76/54/i255/61/82/i255/81/51/56/49/57/54/83/53/61/62/80/i255/81/51/56/49/57/54/83/53/61/62/80/i255/81/51/56/49/57/54/83/53/61/62/i255/81/61/55/62/53/90/80/i255/91/61/55/53/51/i255/38/9/7/12/11/6/15/9/17/i255/9/13/i255/18/5/11/11/i255/9/13/i255/9/15/i255/6/15/6/21/9/11/i255/20/11/9/15/i255/1/12/7/i255/3/4/5 /16/12/14/26/25/5/15/3/9/21/12/15/i255/9/15/16/i255/7/5/14/12/8/5/7/27/i255/12/1/i255/4/26/25/9/15/i255/7/5/25/9/6/15/13/i255/9/13/13/12/14/6/9/3/5/16/i255/18/6/3/4/i255/3/4/5/i255/38/6/3/27/70/13/i255/13/5/14/12/15/16/i255/12/68/14/6/9/11/i255/25/26/15/6/14/6/20/9/11/i255/14/5/25/5/3/5/7/27/i255/3/4/9/3 /6/13/i255/11/12/14/9/3/5/16/i255/6/15/i255/3/4/5/i255/20/7/12/41/5/14/3/i255/9/7/5/9/45 /i255 /38/12/15/13/26/11/3/9/21/12/15/i255/18/6/3/4/i255/3/4/5/i255/22/32/33/34/i255/6/13/i255/15/12/3/i255/9/i255/13/26/10/13/21/3/26/21/12/15/i255/1/12/7/i255/14/12/15/13/26/11/3/9/21/12/15/i255/18/6/3/4/i255/46/7/6/10/9/11/i255/32/6/13/3/12/7/6/14/i255/33/7/5/13/5/7/8/9/21/12/15/i255/34/68/14/5/13/17/i255/12/3/4/5/7 /96/9/21/8/5/i255/39/25/5/7/6/14/9/15/i255/3/7/6/10/5/13/i255/6/15/14/11/26/16/6/15/19/i255/3/4/12/13/5/i255/18/6/3/4/i255/13/3/9/3/5/i255/7/5/14/12/19/15/6/21/12/15/17/i255/11/12/14/9/11/i255/19/12/8/5/7/15/25/5/15/3/13/17/i255/12/7/i255/3/4/5/i255/20/26/10/11/6/14/45/i255/34/26/7/i255/12/68/14/5/i255/6/13/i255/12/15/11/27 /20/7/12/8/6/16/6/15/19/i255/14/12/25/25/5/15/3/13/i255/12/15/i255/3/4/5/i255/3/5/14/4/15/6/14/9/11/i255/25/5/7/6/3/13/i255/12/1/i255/3/4/5/i255/16/7/9/74/i255/48/49/50/51/56/54/61/57/61/76/52/50/56/57/i255/77/61/49/78/i255/79/57/56/62/45/i255/37/5/i255/15/12/3/5/i255/3/4/9/3/i255/3/4/5/i255/20/7/5/13/5/15/14/5/i255/12/7 /9/10/13/5/15/14/5/i255/12/1/i255/9/15/27/i255/4/26/25/9/15/i255/7/5/25/9/6/15/13/i255/4/9/13/i255/15/12/3/i255/10/5/5/15/i255/5/13/3/9/10/11/6/13/4/5/16/i255/3/12/i255/16/9/3/5/i255/10/27/i255/9/15/27/i255/69/15/12/18/15/i255/13/26/7/8/5/27/17/i255/14/12/15/13/3/7/26/14/21/12/15/17/i255/12/7/i255/5/24/14/9/8/9/21/12/15 /20/7/12/41/5/14/3/i255/12/7/i255/9/14/21/8/6/3/27/45/i255/34/26/7/i255/14/12/25/25/5/15/3/13/i255/12/15/i255/3/4/5/i255/48/49/50/51/56/54/61/57/61/76/52/50/56/57/i255/77/61/49/78/i255/79/57/56/62/i255/16/12/i255/15/12/3/i255/16/5/15/12/3/5/i255/9/14/14/5/20/3/9/15/14/5/i255/12/7/i255/9/20/20/7/12/8/9/11/i255/12/1/i255/3/4/5 /7/5/25/12/8/9/11/i255/12/1/i255/4/26/25/9/15/i255/7/5/25/9/6/15/13/i255/12/7/i255/12/1/i255/9/i255/20/12/3/5/15/21/9/11/i255/25/9/13/13/i255/10/26/7/6/9/11/i255/19/7/12/26/15/16/45/i255/0/3/i255/6/13/i255/3/4/5/i255/7/5/13/20/12/15/13/6/10/6/11/6/3/27/i255/12/1/i255/3/4/5/i255/34/18/15/5/7/31/39/20/20/11/6/14/9/15/3/17 /3/4/5/i255/38/12/11/11/5/19/5/i255/12/1/i255/38/4/9/7/11/5/13/3/12/15/17/i255/3/12/i255/14/12/25/20/11/27/i255/18/6/3/4/i255/9/11/11/i255/9/20/20/11/6/14/9/10/11/5/i255/14/5/25/5/3/5/7/27/i255/11/9/18/13/i255/9/15/16/i255/7/5/19/26/11/9/21/12/15/13/i255/9/13/i255/18/5/11/11/i255/9/13/i255/6/25/20/11/5/25/5/15/3/9/21/12/15 /12/1/i255/5/3/4/6/14/9/11/i255/9/20/20/7/12/9/14/4/5/13/i255/3/12/i255/3/4/5/i255/3/7/5/9/3/25/5/15/3/i255/12/1/i255/4/26/25/9/15/i255/7/5/25/9/6/15/13/45/i255/34/26/7/i255/12/68/14/5/i255/7/5/14/12/25/25/5/15/16/13/i255/14/12/15/13/26/11/21/15/19/i255/3/4/5/i255/39/16/8/6/13/12/7/27/i255/38/12/26/15/14/6/11 /12/15/i255/32/6/13/3/12/7/6/14/i255/33/7/5/13/5/7/8/9/21/12/15/70/13/i255/33/12/11/6/14/27/i255/22/3/9/3/5/25/5/15/3/i255/12/15/i255/40/26/7/6/9/11/i255/22/6/3/5/13/17/i255/32/26/25/9/15/i255/66/5/25/9/6/15/13/17/i255/9/15/16/i255/35/26/15/5/7/9/7/27/i255/34/10/41/5/14/3/13/17/i255/13/5/5 /4/29/20/13/28/31/31/18/18/18/45/9/14/4/20/45/19/12/8/31/16/6/19/6/3/9/11/97/11/6/10/7/9/7/27/97/13/5/14/21/12/15/97/98/73/99/97/11/9/15/16/6/15/19/31/9/14/4/20/97/20/12/11/6/14/27/97/13/3/9/3/5/25/5/15/3/97/10/26/7/6/9/11/97/13/6/3/5/13/97/4/26/25/9/15/97/7/5/25/9/6/15/13/97/9/15/16/97 /1/26/15/5/7/9/7/27/45 /34/26/7/i255/12/68/14/5/i255/7/5/14/12/25/25/5/15/16/13/i255/3/4/9/3/i255/3/4/5/i255/48/49/50/51/56/54/61/57/61/76/52/50/56/57/i255/77/61/49/78/i255/79/57/56/62/i255/6/15/14/12/7/20/12/7/9/3/5/i255/9/15/16/31/12/7/i255/9/15/12/3/4/5/7/i255/20/11/9/15/15/6/15/19/i255/16/12/14/26/25/5/15/3/i255/10/5 /16/5/8/5/11/12/20/5/16/i255/9/15/16/i255/20/7/12/8/6/16/5/16/i255/1/12/7/i255/7/5/8/6/5/18/i255/7/5/19/9/7/16/6/15/19/i255/3/4/5/i255/20/7/12/3/5/14/21/12/15/i255/9/15/16/i255/4/12/11/6/13/21/14/i255/3/7/5/9/3/25/5/15/3/i255/12/1/i255/4/26/25/9/15/i255/7/5/25/9/6/15/13/45/i255/37/5 /7/5/14/12/25/25/5/15/16/i255/13/3/9/21/15/19/i255/25/12/7/5/i255/14/11/5/9/7/11/27/i255/3/4/9/3/i255/9/11/11/i255/4/6/13/3/12/7/6/14/i255/10/26/7/6/9/11/13/i255/9/7/5/i255/20/7/12/3/5/14/3/5/16/i255/26/15/16/5/7/i255/9/3/i255/25/6/15/6/25/26/25/i255/22/12/26/3/4/i255/38/9/7/12/11/6/15/9/i255/10/26/7/6/9/11 /11/9/18/13/17/i255/14/6/21/15/19/i255/3/4/5/13/5/i255/11/9/18/13/i255/9/14/14/12/7/16/6/15/19/11/27/28 /100/101/102/103/101/102/104/105/i255/107/108/109/107/108/i255/110/111/112 /113/109/i255/114/115/116/117/113/118/119/i255/102/108/120/i255/121/113/122/i255/123/116/124/125/119/115/126/118/119/127/116/124/i255/128/i255/123/129/123/130/131/132/133/130/134/123/111/i255/114/115/116/117/113/118/119/i255/112/113/135/127/113/122/i255/136/116/115/137/i255/138/124/139/i255/110/115/118/140/138/113/116/141/116/142/143/i255/114/141/138/124/i255/128/i255/144/116/115/115/113/141/141/105/i255/145/138/126/115/138/i255/145/113/113/i255/128/i255/146/126/119/141/116/116/147 /138/148/116/126/119/109/148/141/138/124/147 /149/101/103 /0/1/2/3/2/1/4/5/6/7/8/i255/5/8/10/i255/0/1/7/11/2/12/6/7/8/i255/7/13/i255/14/15/5/8/10/7/8/2/10/i255/5/8/10/i255/16/8/17/5/18/8/11/5/18/8/2/10/i255/19/2/17/2/11/2/1/18/2/3 /20/21/22/21/23/24/25/i255/26/19/i255/19/7/10/2/i255/7/13/i255/27/5/28/3 /29/2/3/11/1/30/12/6/7/8/i255/7/1/i255/29/2/3/2/12/1/5/6/7/8/i255/7/13/i255/31/30/17/5/8/i255/32/2/17/5/18/8/3/i255/7/1/i255/32/2/33/7/3/18/11/7/1/18/2/3/i255/34/35/2/1/2/7/13/36/i255/0/2/8/5/37/6/2/3 /22/20/21/22/38/21/20/39/39/25/i255/26/19/i255/19/7/10/2/i255/7/13/i255/27/5/28/3 /32/2/17/7/4/5/37/i255/7/13/i255/14/15/5/8/10/7/8/2/10/i255/19/2/17/2/11/2/1/18/2/3 /40/38/21/41/23/21/22/39/i255/11/35/1/30/i255/40/38/21/41/23/21/41/39/25/i255/26/19/i255/19/7/10/2/i255/7/13/i255/27/5/28/3 /14/12/12/2/3/3/i255/11/7/i255/19/2/17/2/11/2/1/18/2/3/i255/7/8/i255/0/1/18/4/5/11/2/i255/0/1/7/33/2/1/11/42 /40/38/21/41/23/21/23/22/39/25/i255/26/19/i255/19/7/10/2/i255/7/13/i255/27/5/28/3 /i255 /34/35/2/i255/43/44/45/46/47/48/49/50/49/51/52/45/47/50/i255/54/49/44/55/i255/56/50/47/57/i255/5/8/10/58/7/1/i255/33/37/5/8/8/18/8/59/i255/10/7/12/30/17/2/8/11/3/i255/28/7/30/37/10/i255/15/2/8/2/60/11/i255/13/1/7/17/i255/10/7/12/30/17/2/8/11/5/6/7/8/i255/15/42/i255/11/35/2 /61/28/8/2/1/58/14/33/33/37/18/12/5/8/11/25/i255/11/35/2/i255/19/7/37/37/2/59/2/i255/7/13/i255/19/35/5/1/37/2/3/11/7/8/25/i255/1/2/59/5/1/10/18/8/59/i255/35/7/28/i255/3/11/5/11/2/i255/15/30/1/18/5/37/i255/37/5/28/3/i255/35/5/4/2/i255/15/2/2/8/i255/5/8/10/i255/28/18/37/37/i255/15/2/i255/12/7/17/33/37/18/2/10/i255/28/18/11/35/25 /18/8/i255/11/2/1/17/3/i255/7/13/i255/1/2/62/30/18/1/2/10/i255/5/33/33/1/7/4/5/37/3/25/i255/8/7/6/60/12/5/6/7/8/25/i255/5/8/10/i255/1/2/17/7/4/5/37/i255/5/8/10/58/7/1/i255/1/2/15/30/1/18/5/37/i255/33/37/5/8/3/25/i255/5/3/i255/28/2/37/37/i255/5/3/i255/33/5/1/6/2/3/i255/37/2/59/5/37/37/42/i255/1/2/62/30/18/1/2/10 /11/7/i255/15/2/i255/12/7/8/3/30/37/11/2/10/i255/18/8/i255/5/10/10/18/6/7/8/i255/11/7/i255/10/2/3/12/2/8/10/5/8/11/i255/12/7/17/17/30/8/18/11/42/i255/33/5/1/6/2/3/i255/11/35/5/11/i255/28/18/37/37/i255/15/2/i255/12/7/8/3/30/37/11/2/10/i255/5/8/10/i255/18/8/4/7/37/4/2/10/i255/18/8/i255/10/2/12/18/3/18/7/8 /17/5/63/18/8/59/64 /i255 /65/66/67/i255/69/70/71/72/i255/67/72 /71/69/73/73/72/74/75/76/i255/77/76/i255/77/i255/78/72/67/73/79/80/i255/71/69/74/75/79/81/69/74/i255/80/82/77/80/i255/77/i255/67/72/83/79/76/72/75/i255/84/85/86/87/88/89/90/91/90/92/93/86/88/91/i255/95/90/85/96/i255/97/91/88/98/i255/99/72/i255/78/67/69/83/79/75/72/75/i255/80/69/i255/80/82/79/76/i255/69/70/71/72 /77/74/75/i255/100/101/102/103/104/105/106/i255/107/69/67/i255/67/72/83/79/72/108/i255/77/74/75/i255/77/78/78/67/69/83/77/109/i255/78/67/79/69/67/i255/80/69/i255/77/74/110/i255/111/67/69/66/74/75/i255/75/79/76/80/66/67/99/79/74/111/i255/77/71/81/83/79/81/72/76/i255/77/74/75/i255/99/72/111/79/74/74/79/74/111/i255/77/74/110/i255/108/69/67/112/113/i255/61/30/1 /7/114/12/2/115/3/i255/11/2/12/35/8/18/12/5/37/i255/12/7/17/17/2/8/11/3/i255/7/8/i255/11/35/2/i255/43/44/45/46/47/48/49/50/49/51/52/45/47/50/i255/54/49/44/55/i255/56/50/47/57/i255/5/1/2/i255/37/18/3/11/2/10/i255/15/2/37/7/28/i255/5/8/10/i255/3/35/7/30/37/10/i255/15/2/i255/18/8/12/7/1/33/7/1/5/11/2/10/i255/18/8/11/7/i255/11/35/2 /1/2/4/18/3/2/10/i255/10/1/5/116/i255/33/1/7/4/18/10/2/10/i255/13/7/1/i255/1/2/4/18/2/28/117/i255 /i255 /21/21/34/35/2/i255/10/18/4/18/3/18/7/8/i255/7/13/i255/33/1/7/118/2/12/11/i255/28/7/1/63/i255/18/8/11/7/i255/13/7/30/1/i255/28/7/1/63/i255/3/11/5/59/2/3/i255/7/1/i255/33/35/5/3/2/3/25/i255/28/35/18/37/2/i255/35/2/37/33/13/30/37/i255/11/7/i255/30/8/10/2/1/3/11/5/8/10/18/8/59/i255/11/35/2/i255/6/17/18/8/59 /5/8/10/i255/33/1/7/59/1/2/3/3/18/7/8/i255/7/13/i255/28/7/1/63/i255/33/35/5/3/2/3/i255/13/7/1/i255/11/35/2/i255/7/4/2/1/5/37/37/i255/33/1/7/118/2/12/11/25/i255/28/7/30/37/10/i255/15/2/i255/11/2/12/35/8/18/12/5/37/37/42/i255/18/17/33/1/7/4/2/10/i255/15/42/i255/12/37/2/5/1/2/1 /33/1/7/11/7/12/7/37/3/i255/28/18/11/35/18/8/i255/2/5/12/35/i255/3/11/5/59/2/64/i255/119/7/1/i255/2/120/5/17/33/37/2/25/i255/28/2/i255/1/2/12/7/17/17/2/8/10/i255/33/1/7/4/18/10/18/8/59/i255/12/37/2/5/1/2/1/i255/33/1/7/11/7/12/7/37/3/i255/13/7/1/i255/15/7/11/35/i255/11/35/2 /18/10/2/8/6/60/12/5/6/7/8/i255/5/8/10/i255/1/2/12/7/4/2/1/42/i255/7/13/i255/3/11/1/30/12/11/30/1/5/37/i255/1/2/17/5/18/8/3/25/i255/35/30/17/5/8/i255/1/2/17/5/18/8/3/25/i255/5/8/10/58/7/1/i255/5/1/6/13/5/12/11/3/36/i255/13/7/1/i255/12/7/8/3/30/37/11/5/6/7/8 /33/1/7/11/7/12/7/37/3/i255/28/18/11/35/i255/26/31/0/61/25/i255/11/35/2/i255/19/7/30/8/11/42/i255/19/7/1/7/8/2/1/25/i255/29/121/26/21/122/19/123/25/i255/11/35/2/i255/19/18/11/42/i255/7/13/i255/19/35/5/1/37/2/3/11/7/8/25/i255/5/8/10/i255/19/35/5/1/37/2/3/11/7/8/i255/19/7/30/8/11/42/36/i255/5/8/10/25 /13/7/1/i255/11/1/2/5/11/17/2/8/11/i255/7/13/i255/5/1/12/35/18/11/2/12/11/30/1/5/37/i255/13/2/5/11/30/1/2/3/i255/7/1/i255/7/11/35/2/1/i255/4/5/1/18/7/30/3/i255/8/7/8/21/35/30/17/5/8/i255/3/30/15/3/30/1/13/5/12/2/i255/13/2/5/11/30/1/2/3/25/i255/11/5/63/18/8/59/i255/18/8/11/7 /5/12/12/7/30/8/11/i255/124/5/6/7/8/5/37/i255/32/2/59/18/3/11/2/1/i255/2/37/18/59/18/15/18/37/18/11/42/i255/2/4/5/37/30/5/6/7/8/3/64/i255/14/10/10/18/6/7/8/5/37/37/42/25/i255/11/35/2/1/2/i255/5/1/2/i255/3/7/17/2/i255/7/4/2/1/37/5/33/i255/5/8/10/i255/10/18/3/12/1/2/33/5/8/12/18/2/3/i255/18/8 /11/35/2/i255/28/7/1/63/i255/33/37/5/8/i255/3/11/5/59/18/8/59/64/i255/119/7/1/i255/2/120/5/17/33/37/2/25/i255/33/64/i255/125/25/i255/11/35/18/1/10/i255/33/5/1/5/59/1/5/33/35/i255/3/11/5/11/2/3/i255/11/35/5/11/i255/2/120/12/5/4/5/6/7/8/i255/7/13/i255/15/30/1/18/5/37/3/i255/18/3/i255/18/8/11/2/8/10/2/10/i255/11/7/i255/15/2 /30/8/10/2/1/11/5/63/2/8/i255/10/30/1/18/8/59/i255/26/11/5/59/2/i255/41/25/i255/8/7/6/8/59/i255/18/8/i255/11/35/2/i255/33/1/2/12/2/10/18/8/59/i255/3/2/8/11/2/8/12/2/3/i255/11/35/5/11/i255/8/7/i255/13/30/1/11/35/2/1/i255/2/120/12/5/4/5/6/7/8/i255/5/11/i255/11/35/5/11/i255/37/7/12/5/6/7/8 /28/18/37/37/i255/7/12/12/30/1/i255/10/30/1/18/8/59/i255/26/11/5/59/2/3/i255/22/25/40/25/i255/23/25/i255/18/8/3/11/2/5/10/i255/11/35/2/i255/37/7/12/5/6/7/8/i255/28/18/37/37/i255/15/2/i255/1/2/12/7/1/10/2/10/i255/7/8/i255/60/2/37/10/i255/13/7/1/17/3/25/i255/17/5/33/3/25/i255/5/8/10/i255/7/8/i255/5/i255/126/127/26 /33/37/5/128/7/1/17/25/i255/15/30/11/i255/11/35/2/i255/13/7/37/37/7/28/18/8/59/i255/33/5/1/5/59/1/5/33/35/i255/3/11/5/11/2/3/i255/11/35/5/11/i255/33/1/18/7/1/i255/11/7/i255/18/8/18/6/5/6/7/8/i255/7/13/i255/26/11/5/59/2/i255/41/i255/7/13/i255/11/35/2/i255/28/7/1/63/i255/33/37/5/8/129/64/64/1/2/17/5/18/8/3 /28/18/37/37/i255/12/7/37/37/2/12/11/2/10/i255/5/8/10/i255/11/1/5/8/3/33/7/1/11/2/10/i255/11/7/i255/11/35/2/i255/60/2/37/10/i255/7/114/12/2/i255/13/7/1/i255/11/2/17/33/7/1/5/1/42/i255/3/2/12/30/1/2/i255/3/11/7/1/5/59/2/64/i255/34/35/2/i255/33/1/7/11/7/12/7/37/3/i255/8/2/2/10/i255/11/7/i255/15/2 /12/37/2/5/1/2/1/i255/1/2/59/5/1/10/18/8/59/i255/28/35/2/8/i255/10/18/3/12/7/4/2/1/2/10/i255/1/2/17/5/18/8/3/i255/28/18/37/37/i255/15/2/i255/17/5/1/63/2/10/25/i255/15/30/130/2/1/2/10/25/i255/5/8/10/i255/12/7/4/2/1/2/10/i255/15/5/12/63/i255/30/33/i255/18/8/i255/11/35/2/i255/60/2/37/10/i255/4/3 /12/7/37/37/2/12/11/2/10/i255/5/8/10/58/7/1/i255/1/2/17/7/4/2/10/i255/7/1/i255/2/120/12/5/4/5/11/2/10/64 /i255 /21/21/119/7/37/37/7/28/18/8/59/i255/7/30/1/i255/131/132/52/133/47/57/45/48/i255/134/49/44/i255/43/44/45/46/47/48/49/50/49/51/52/45/47/50/i255/135/52/136/48/i255/137/49/57/52/136/49/44/52/57/51/25/i255/11/35/2/i255/5/1/12/35/5/2/7/37/7/59/18/12/5/37/i255/17/7/8/18/11/7/1/18/8/59/i255/33/37/5/8/i255/8/2/2/10/3/i255/11/7 /3/33/2/12/18/13/42/i255/11/35/2/i255/2/120/5/12/11/i255/5/17/7/30/8/11/i255/7/13/i255/6/17/2/i255/10/30/1/18/8/59/i255/28/35/18/12/35/i255/12/7/8/3/11/1/30/12/6/7/8/i255/2/120/12/5/4/5/6/7/8/3/i255/10/30/1/18/8/59/i255/5/37/37/i255/28/7/1/63/i255/3/11/5/59/2/3/i255/5/1/2/i255/11/7/i255/15/2 /17/5/10/2/i255/5/4/5/18/37/5/15/37/2/i255/13/7/1/i255/5/1/12/35/5/2/7/37/7/59/18/12/5/37/i255/28/7/1/63/i255/5/8/10/58/7/1/i255/18/8/3/33/2/12/6/7/8/64 /i255 /21/21/29/30/1/18/8/59/i255/11/35/2/i255/18/8/18/6/5/37/i255/3/11/5/59/2/i255/7/8/2/i255/7/13/i255/10/2/17/7/37/18/6/7/8/25/i255/3/35/7/30/37/10/i255/5/8/42/i255/8/7/8/21/35/30/17/5/8/i255/5/1/12/35/18/11/2/12/11/30/1/5/37/i255/13/2/5/11/30/1/2/3/i255/5/8/10/58/7/1/i255/7/11/35/2/1 /4/5/1/18/7/30/3/i255/8/7/8/21/35/30/17/5/8/i255/3/30/15/3/30/1/13/5/12/2/i255/13/2/5/11/30/1/2/3/i255/15/2/i255/8/7/11/2/10/i255/15/42/i255/11/35/2/i255/5/1/12/35/5/2/7/37/7/59/18/12/5/37/i255/17/7/8/18/11/7/1/25/i255/28/7/1/63/i255/18/8/i255/11/35/18/3/i255/5/1/2/5/i255/28/18/37/37 /8/2/2/10/i255/11/7/i255/12/2/5/3/2/i255/18/17/17/2/10/18/5/11/2/37/42/i255/5/8/10/i255/15/2/i255/15/30/130/2/1/2/10/64/i255/34/2/1/1/5/12/7/8/i255/28/18/37/37/i255/12/7/8/11/5/12/11/i255/7/30/1/i255/7/114/12/2/i255/28/18/11/35/18/8/i255/40/41/21/41/138/i255/15/30/3/18/8/2/3/3/i255/35/7/30/1/3/25 /33/1/7/4/18/10/18/8/59/i255/5/i255/10/2/11/5/18/37/2/10/i255/10/2/3/12/1/18/33/6/7/8/i255/7/13/i255/11/35/2/i255/5/13/7/1/2/17/2/8/6/7/8/2/10/i255/5/1/12/35/5/2/7/37/7/59/18/12/5/37/i255/13/2/5/11/30/1/2/64/i255/34/2/1/1/5/12/7/8/i255/3/35/7/30/37/10/i255/33/1/7/4/18/10/2 /3/30/114/12/18/2/8/11/i255/3/30/33/33/7/1/6/8/59/i255/10/7/12/30/17/2/8/11/5/6/7/8/i255/11/7/i255/7/30/1/i255/7/114/12/2/i255/11/7/i255/2/8/5/15/37/2/i255/5/i255/124/5/6/7/8/5/37/i255/32/2/59/18/3/11/2/1/i255/2/37/18/59/18/15/18/37/18/11/42/i255/10/2/11/2/1/17/18/8/5/6/7/8/i255/11/7 /15/2/i255/17/5/10/2/25/i255/7/1/i255/33/1/7/4/18/10/2/i255/5/i255/124/5/6/7/8/5/37/i255/32/2/59/18/3/11/2/1/i255/2/37/18/59/18/15/18/37/18/11/42/i255/1/2/12/7/17/17/2/8/10/5/6/7/8/i255/28/18/11/35/i255/3/30/33/33/7/1/6/8/59/i255/10/7/12/30/17/2/8/11/5/6/7/8/i255/11/7/i255/7/30/1 /7/114/12/2/i255/13/7/1/i255/7/30/1/i255/12/7/8/12/30/1/1/2/8/12/2/64/i255/0/1/7/11/7/12/7/37/3/i255/3/35/7/30/37/10/i255/15/2/i255/33/1/7/4/18/10/2/10/i255/13/7/1/i255/26/31/0/61/i255/12/7/8/3/30/37/11/5/6/7/8/i255/5/8/10/i255/5/10/10/18/6/7/8/5/37/i255/2/120/12/5/4/5/6/7/8 /3/11/2/33/3/i255/5/8/10/i255/11/1/2/5/11/17/2/8/11/i255/17/2/5/3/30/1/2/3/i255/5/3/i255/10/2/2/17/2/10/i255/8/2/12/2/3/3/5/1/42/64 /i255 /21/21/34/2/1/1/5/12/7/8/i255/28/18/37/37/i255/33/1/7/4/18/10/2/i255/7/30/1/i255/7/114/12/2/i255/5/i255/3/2/33/5/1/5/11/2/i255/126/0/32 /i255/17/2/11/35/7/10/7/37/7/59/18/12/5/37/i255/33/37/5/8/25/i255/10/2/11/5/18/37/18/8/59/i255/11/35/2/i255/33/1/7/33/7/3/2/10/i255/11/1/5/8/3/2/12/11/3/25 /11/1/5/8/3/2/12/11/i255/3/33/5/12/18/8/59/i255/5/8/10/i255/3/33/2/12/18/60/12/5/6/7/8/3/i255/7/8/i255/11/35/2/i255/2/120/5/12/11/i255/126/0/32/i255/17/7/10/2/37/i255/30/6/37/18/139/2/10/64/i255/16/33/7/8/i255/12/7/17/33/37/2/6/7/8/i255/7/13/i255/11/35/2/i255/126/0/32/i255/3/30/1/4/2/42/25 /140/141/142/143/141/142/144/145/i255/147/148/149/147/148/i255/150/151/152 /153/149/i255/154/155/156/157/153/158/159/i255/142/148/160/i255/161/153/162/i255/163/156/164/165/159/155/166/158/159/167/156/164/i255/168/i255/163/169/163/170/171/172/173/170/174/163/151/i255/154/155/156/157/153/158/159/i255/152/153/175/167/153/162/i255/176/156/155/177/i255/178/164/179/i255/150/155/158/180/178/153/156/181/156/182/183/i255/154/181/178/164/i255/168/i255/184/156/155/155/153/181/181/145/i255/185/178/166/155/178/i255/185/153/153/i255/168/i255/186/166/159/181/156/156/187 /178/188/156/166/159/149/188/181/178/164/187 /160/141/143 /0/1/2/2/3/4/5/6/i255/8/9/10/10/i255/11/2/5/12/9/13/1/i255/5/14/2/i255/5/15/4/1/i255/16/17/18/i255/3/19/11/10/9/20/14/13/1/i255/19/3/11/21/i255/5/22/i255/3/10/10/i255/21/11/1/4/9/23/4/i255/24/19/1/21/10/9/4/1/21/i255/3/20/i255/3/10/10/i255/12/3/2/9/5/14/21/i255/13/1/11/20/25/21/26/i255/22/5/2 /9/6/13/1/11/1/6/13/1/6/20/i255/2/1/12/9/1/8/i255/3/6/13/i255/8/9/10/10/i255/6/5/20/i255/11/2/5/4/1/1/13/i255/8/9/20/25/i255/1/27/25/14/19/3/24/5/6/i255/5/22/i255/28/14/2/9/3/10/21/i255/14/6/24/10/i255/20/25/1/i255/29/30/17/31/i255/32/9/12/1/21/i255/4/5/6/4/14/2/2/1/6/4/1/i255/5/6 /3/10/10/i255/11/5/20/1/6/24/3/10/i255/3/6/5/19/3/10/9/1/21/33/11/5/20/1/6/24/3/10/i255/28/14/2/9/3/10/21/34 /i255 /35/35/11/34/i255/36/26/i255/37/1/10/1/20/1/i255/38/21/1/1/i255/39/5/19/11/1/6/21/3/24/5/6/26/i255/28/1/10/5/8/40/i255/5/2/i255/11/2/5/12/9/13/1/i255/20/25/1/i255/4/5/19/11/1/6/21/3/24/5/6/i255/23/32/14 /2/1/21/34/i255/17/3/32/1/i255/41/42/i255/3/10/21/5/i255/4/9/20/1/21/i255/3 /38/4/5/19/11/1/6/21/3/24/5/6/i255/20/3/28/10/1/i255/28/1/10/5/8/40/34 /i255 /35/35/17/10/1 /3/21/1/i255/11/2/5/12/9/13/1/i255/3/6/i255/9/6/4/5/2/11/5/2/3/20/1/13/i255/11/10/3/6/i255/22/5/2/i255/21/1/4/14/2/9/6/32/i255/20/25/1/i255/11/2/5/43/1/4/20/i255/21/9/20/1/i255/3/6/13/i255/20/25/1/i255/20/1/19/11/5/2/3/2/44/i255/23/1/10/13/i255/5/15/4/1/i255/22/2/5/19 /11/5/20/1/6/24/3/10/i255/10/5/5/24/6/32/34/i255/17/10/1/3/21/1/i255/11/2/5/12/9/13/1/i255/4/10/3/2/9/23/4/3/24/5/6/i255/5/22/i255/8/25/3/20/i255/3/2/4/25/3/1/5/10/5/32/9/4/3/10/i255/2/1/21/5/14/2/4/1/21/i255/5/2/i255/25/14/19/3/6/i255/2/1/19/3/9/6/21/i255/8/9/10/10/i255/28/1 /21/20/5/2/1/13/i255/9/6/i255/20/25/1/i255/20/1/19/11/5/2/3/2/44/i255/23/1/10/13/i255/5/15/4/1/i255/12/21/i255/3/20/i255/5/45/35/21/9/20/1/i255/5/15/4/1/21/i255/5/2/i255/21/20/5/2/3/32/1/i255/3/2/1/3/21/34 /i255 /35/35/17/10/1/3/21/1/i255/2/1/12/9/21/1/i255/20/25/1/i255/11/10/3/6/i255/20/5/i255/21/20/3/20/1/i255/20/25/3/20/i255/5/14/2/i255/5/15/4/1/i255/8/9/10/10/i255/28/1/i255/11/2/5/12/9/13/1/13/i255/13/5/4/14/19/1/6/20/3/24/5/6/i255/5/22/i255/20/25/1/i255/25/3/6/13/i255/3/14/32/14/2/9/6/32/i255/5/2 /21/5/9/10/i255/11/1/6/1/20/2/5/19/1/20/1/2/i255/11/2/5/28/9/6/32/i255/9/6/i255/29/20/3/32/1/i255/46/26/i255/28/1/22/5/2/1/i255/4/5/6/24/6/14/9/6/32/i255/8/9/20/25/i255/20/25/1/i255/2/1/19/3/9/6/9/6/32/i255/11/5/2/24/5/6/21/i255/5/22/i255/20/25/1/i255/1/27/25/14/19/3/24/5/6/34 /i255 /35/35/31/14/2 /i255/5/15/4/1/i255/2/1/47/14/1/21/20/21/i255/20/25/3/20/i255/3/10/10/i255/9/6/22/5/2/19/3/24/5/6/i255/4/5/6/4/1/2/6/9/6/32/i255/10/5/4/3/24/5/6/3/10/i255/13/3/20/3/i255/5/22/i255/25/14/19/3/6/i255/2/1/19/3/9/6/21/i255/2/1/19/3/9/6/i255/2/1/13/3/4/20/1/13 /9/6/22/5/2/19/3/24/5/6/i255/20/5/i255/20/25/1/i255/11/14/28/10/9/4/34/i255/48/5/4/3/24/5/6/3/10/i255/13/3/20/3/i255/5/22/i255/25/14/19/3/6/i255/2/1/19/3/9/6/21/i255/4/3/6/i255/28/1/i255/2/1/10/1/3/21/1/13/i255/20/5/i255/20/25/1/i255/11/14/28/10/9/4/i255/5/6/4/1/i255/20/25/1 /11/2/5/43/1/4/20/i255/9/21/i255/4/5/19/11/10/1/20/1/i255/49/9/34/1/34/26/i255/3/10/10/i255/1/27/4/3/12/3/24/5/6/21/i255/3/2/1/i255/4/5/19/11/10/1/20/1/26/i255/3/10/10/i255/28/14/2/9/3/10/21/i255/25/3/12/1/i255/28/1/1/6/i255/22/14/10/10/44/i255/2/1/19/5/12/1/13/26/i255/3/6/13/i255/20/25/1/i255/13/2/3/50 /2/1/11/5/2/20/i255/25/3/21/i255/28/1/1/6/i255/23/6/3/10/9/51/1/13/i255/28/44/i255/5/14/2/i255/5/15/4/1/52/34 /i255 /35/35/11/34/i255/53/26/i255/31/14/2/i255/5/15/4/1/i255/4/5/6/4/14/2/21/i255/20/25/3/20/i255/3/i255/21/1/11/3/2/3/20/1/i255/8/5/2/54/i255/11/10/3/6/i255/22/5/2/i255/20/25/1/i255/9/6/4/10/14/21/9/5/6/i255/5/22/i255/39/5/10/10/1/32/1/i255/5/22/i255/39/25/3/2/10/1/21/20/5/6/i255/21/20/14/13/1/6/20/21/i255/3/6/13 /22/3/4/14/10/20/44/i255/21/25/5/14/10/13/i255/28/1/i255/13/1/12/1/10/5/11/1/13/i255/3/6/13/i255/11/2/5/12/9/13/1/13/i255/20/5/i255/5/14/2/i255/5/15/4/1/i255/22/5/2/i255/2/1/12/9/1/8/34/i255/37/14/1/i255/20/5/i255/11/5/20/1/6/24/3/10/i255/9/6/22/2/3/4/24/5/6/21/i255/5/22/i255/29/5/14/20/25 /39/3/2/5/10/9/6/3/i255/28/14/2/9/3/10/i255/10/3/8/21/i255/49/41/53/35/41/55/35/53/56/56/26/i255/29/39/i255/39/5/13/1/i255/5/22/i255/48/3/8/21/52/26/i255/21/25/5/14/10/13/i255/39/5/10/10/1/32/1/i255/5/22/i255/39/25/3/2/10/1/21/20/5/6/i255/11/2/5/22/1/21/21/9/5/6/3/10/21/i255/5/2/i255/21/20/14/13/1/6/20/21 /28/1/i255/9/6/4/10/14/13/1/13/i255/22/5/2/i255/11/5/20/1/6/24/3/10/i255/1/27/4/3/12/3/24/5/6/21/26/i255/20/25/1/44/i255/21/25/5/14/10/13/i255/5/6/10/44/i255/28/1/i255/9/6/4/10/14/13/1/13/i255/5/6/i255/1/27/4/3/12/3/24/5/6/21/i255/5/22/i255/6/5/6/35/25/14/19/3/6 /3/2/4/25/3/1/5/10/5/32/9/4/3/10/i255/22/1/3/20/14/2/1/34/i255/0/25/1/i255/10/5/4/3/24/5/6/i255/5/22/i255/25/14/19/3/6/i255/2/1/19/3/9/6/21/i255/21/25/5/14/10/13/i255/2/1/19/3/9/6/i255/2/1/13/3/4/20/1/13/i255/9/6/22/5/2/19/3/24/5/6/i255/20/5/i255/28/5/20/25 /11/3/2/24/1/21/i255/3/21/i255/8/1/10/10/34 /i255 /35/35/11/34/i255/57/26/i255/22/5/14/2/20/25/i255/11/3/2/3/32/2/3/11/25/26/i255/23/50/25/i255/21/1/6/20/1/6/4/1/26/i255/2/1/12/9/21/1/i255/20/5/i255/38/i255/20/2/3/6/21/22/1/2/2/1/13/i255/20/5/i255/3/i255/22/14/10/10/44/i255/4/5/12/1/2/1/13/i255/11/10/44/8/5/5/13/i255/28/5/27/26/40/34 /i255 /35/35/11/34/i255/57 /i255/3/6/13/i255/41/56/26/i255/4/25/1/4/54/i255/2/1/22/1/2/1/6/4/1/21/i255/20/5/i255/3/i255/38/10/9/4/1/6/21/1/13/33/4/1/2/24/23/1/13/i255/22/14/6/1/2/3/10/i255/25/5/19/1/i255/13/9/2/1/4/20/5/2/40/i255/22/5/2/i255/4/5/6/21/9/21/20/1/6/4/44/34 /i255 /35/35/11/34/i255/41 /41/26/i255/21/1/4/5/6/13/i255/11/3/2/3/32/2/3/11/25/26/i255/38/10/3/28/1/10/1/13/40/i255/9/21/i255/2/1/11/1/3/20/1/13/i255/9/6/i255/21/3/19/1/i255/21/1/6/20/1/6/4/1/34 /i255 /35/34/11/34/i255/41/41/26/i255/20/25/9/2/13/i255/11/3/2/3/32/2/3/11/25/26/i255/3/i255/24/19/1/22/2/3/19/1/i255/22/5/2/i255/20/25/1/i255/21/14/28/19/9/58/3/10/i255/5/22/i255/20/25/1/i255/13/2/3/50/i255/2/1/11/5/2/20/i255/6/1/1/13/21/i255/20/5/i255/28/1/i255/21/20/3/20/1/13/26/i255/3/21/i255/8/1/10/10/i255/3/21 /8/25/5/i255/20/25/1/i255/2/1/11/5/2/20/i255/8/9/10/10/i255/28/1/i255/11/2/5/12/9/13/1/13/i255/20/5/i255/22/5/2/i255/2/1/12/9/1/8/34/i255/37/1/10/1/20/1/i255/38/19/5/6/9/20/5/2/9/6/32/40/i255/11/2/9/5/2/i255/20/5/i255/2/1/11/5/2/20/i255/9/6/i255/20/25/1/i255/20/25/9/2/13/i255/21/1/6/20/1/6/4/1 /3/6/13/i255/20/25/1/i255/21/1/4/5/6/13/i255/28/14/10/10/1/20/34/i255/17/2/5/12/9/13/1/i255/19/5/2/1/i255/28/14/10/10/1/20/1/13/i255/13/1/20/3/9/10/21/i255/3/21/i255/20/5/i255/20/25/1/i255/4/5/6/20/1/6/20/i255/5/22/i255/20/25/1/i255/2/1/11/5/2/24/6/32/34 /i255 /35/35/0/25/1/i255/1/6/24/2/1/i255/13/5/4/14/19/1/6/20/i255/3/6/13/i255/20/25/1/i255/2/1/11/5/2/24/6/32/i255/5/6/i255/11/34/i255/41/41/i255/6/1/1/13/21/i255/20/5/i255/21/20/3/20/1/i255/19/5/2/1/i255/4/10/1/3/2/10/44/i255/20/25/3/20/i255/20/25/1/i255/1/6/24/2/1/i255/21/9/20/1/i255/21/25/5/14/10/13 /28/1/i255/2/1/4/5/2/13/1/13/i255/8/9/20/25/i255/3/i255/29/39/60/61/61/i255/21/9/20/1/i255/6/14/19/28/1/2/26/i255/3/6/13/i255/20/25/3/20/i255/20/25/1/i255/1/6/24/2/1/i255/21/9/20/1/i255/21/25/5/14/10/13/i255/28/1/i255/1/12/3/10/14/3/20/1/13/i255/3/21/i255/20/25/1/i255/11/2/5/43/1/4/20/i255/14/6/22/5/10/13/21 /22/5/2/i255/62/3/24/5/6/3/10/i255/18/1/32/9/21/20/1/2/i255/1/10/9/32/9/28/9/10/9/20/44/26/i255/20/3/54/9/6/32/i255/9/6/20/5/i255/3/4/4/5/14/6/20/i255/20/25/1/i255/8/5/2/54/i255/11/10/3/6/i255/21/20/3/32/1/21/i255/3/6/13/i255/22/1/3/20/14/2/1/21/i255/3/21/i255/20/25/1/44/i255/3/2/1 /13/9/21/4/5/12/1/2/1/13/34 /i255 /35/35/11/34/i255/41/42/26/i255/10/3/21/20/i255/21/1/6/20/1/6/4/1/26/i255/13/5/i255/6/5/20/i255/9/6/4/10/14/13/1/i255/3/21/21/14/19/11/24/5/6/21/34/i255/29/1/1/i255/5/14/2/i255/11/2/9/5/2/i255/4/5/19/19/1/6/20/21/i255/4/5/6/4/1/2/6/9/6/32/i255/20/25/1/i255/13/1/12/1/10/5/11/19/1/6/20 /5/22/i255/3/i255/11/10/3/6/6/9/6/32/i255/13/5/4/14/19/1/6/20/i255/22/5/2/i255/20/25/1/i255/25/5/10/9/21/24/4/i255/20/2/1/3/20/19/1/6/20/i255/5/22/i255/25/14/19/3/6/i255/2/1/19/3/9/6/21/34 /i255 /35/35/17/10/1/3/21/1/i255/4/10/3/2/9/22/44/i255/25/5/8/i255/3/10/10/i255/14/6/4/5/12/1/2/1/13/i255/3/2/4/25/3/1/5/10/5/32/9/4/3/10/i255/2/1/21/5/14/2/4/1/21/i255/3/6/13/i255/25/14/19/3/6/i255/2/1/19/3/9/6/21/26/i255/3/21/i255/8/1/10/10/i255/3/21/i255/20/25/1/i255/20/1/19/11/5/2/3/2/44 /21/1/4/14/2/1/i255/21/20/5/2/3/32/1/i255/22/3/4/9/10/9/20/44/26/i255/8/9/10/10/i255/28/1/i255/4/14/2/3/20/1/13/i255/4/5/6/21/9/21/20/1/6/20/i255/8/9/20/25/i255/22/1/13/1/2/3/10/i255/21/20/3/6/13/3/2/13/21/i255/10/9/54/1/i255/46/53/i255/39/63/18/i255/55/57/34 /i255 /35/35/0/25/1/i255/29/30/17/31/i255/2/1/47/14/1/21/20/21/i255/20/25/1/i255/2/1/9/6/20/1/2/6/19/1/6/20/i255/10/5/4/3/24/5/6/i255/28/1/i255/23/6/3/10/9/51/1/13/i255/3/21/i255/21/5/5/6/i255/3/21/i255/11/5/21/21/9/28/10/1/26/i255/28/1/22/5/2/1/i255/20/25/1/i255/4/5/6/4/10/14/21/9/5/6/i255/5/22 /20/25/1/i255/11/2/5/43/1/4/20/34/i255/17/10/1/3/21/1/i255/11/2/5/12/9/13/1/i255/20/25/1/i255/3/22/5/2/1/19/1/6/24/5/6/1/13/i255/10/5/4/3/24/5/6/i255/20/5/i255/5/14/2/i255/5/15/4/1/34 /i255 /35/35/18/1/12/9/21/1/i255/11/10/3/6/i255/20/5/i255/21/20/3/20/1/i255/20/25/3 /20/i255/9/22/i255/3/6/44/i255/28/2/9/4/54/i255/2/1/19/6/3/6/20/21/i255/5/22/i255/3/2/4/25/9/20/1/4/20/14/2/3/10/i255/22/1/3/20/14/2/1/21/i255/3/

Text truncated. Open the original for the full document.

Source: City of Charleston website. First collected Oct 14, 2026.