Columbia City Council Regular Meeting Agenda
Tuesday, June 16, 2026 at 4:00 PM
City Hall • Council Chambers
1737 Main Street, 3rd Floor, Columbia, SC 29201
City Clerk’s Office: (803)545-3045 or cityclerk@columbiasc.gov
The Honorable Daniel J. Rickenmann, Mayor
The Honorable Edward H. McDowell, Jr. • The Honorable William Brennan
The Honorable Tina N. Herbert, Mayor Pro-Tempore • The Honorable Peter M. Brown
The Honorable Tyler D. Bailey • The Honorable Sam P. Johnson
Call to Order
Invocation
Pledge of Allegiance
Adoption of the Agenda
Public Input
Individuals are allotted up to three minutes to address City Council about items on the
agenda. Items requiring a public hearing cannot be addressed at this time.
Approval of Minutes
1. Council is asked to approve the June 9, 2026 Regular Meeting Minutes.
Presentations
2. Forging Strong Fathers and Families Month — The Honorable Tyler D. Bailey
3. Scleroderma Awareness Month — The Honorable Daniel J. Rickenmann, Mayor
4. National Homeownership Month Proclamation — The Honorable Daniel J.
Rickenmann, Mayor
Budget Ordinances - Second Reading
5. Ordinance No.: 2026-044 - To Raise Revenue and Adopt the Budget for the City of
Columbia, South Carolina, for the Fiscal Year ending June 30, 2027
First reading approval was given on June 9, 2026.
6. Ordinance No.: 2026-041 - Amending the 1998 Code of Ordinances of the City of
Columbia, South Carolina, Chapter 23, Utilities and Engineering, Article V, Water
and Sewer Rates, Sec. 23-144, Special Water Service Fees, Sec. 23-145,
Installation of water meters and cross connection control devices, Sec. 23-146, Fire
hydrant, fire protection and sprinkler systems charges, Sec. 23-147, Installation of
water meters serving fire protection sprinkler systems, Sec. 23-148, Sewer tapping
fees
Page 2 of 26
First reading approval was given on June 9, 2026.
Consent Agenda Items 7 through 21
7. Council is asked to authorize the City Manager to enter into a new Contract for
Outreach and Programs at the Transitions Homeless Center, as requested by the
Homeless Services Department on June 1, 2026. Award to Midlands Housing
Alliance, Inc., in an amount not to exceed $124,031.26. This firm is located in
Columbia, SC.
Funding Source: Homeless Services - Special Contracts (1014501-638304). The
original budget amount is $124,031.26.
8. Council is asked to authorize the City Manager to enter into a new Contract for
Operations and Security at the Transitions Homeless Center, as requested by the
Homeless Services Department on June 1, 2026. Award to Midlands Housing
Alliance, in the amount not to exceed $325,000.00. This firm is located in Columbia,
SC.
Funding Source: Homeless Services – Professional Services Contracts — Midlands
Housing Alliance (1014501-638304). The original budget amount is $325,000.00.
9. Council is asked to authorize the City Manager to enter into a new Contract for the
Housing First Initiative, as requested by the Homeless Services Department on June
1, 2026. Award to University of South Carolina Supportive Housing Services, in the
amount not to exceed $308,000.00. This firm is located in Columbia, SC.
Funding Source: Homeless Services – Professional Services Contracts — University
of South Carolina Supportive Housing (1014501-638303). The original budget
amount is $308,000.00.
10. Council is asked to authorize the City Manager to enter into a new Contract for Daily
Meal Services at Rapid Shelter Columbia, as requested by the Homeless Services
Department on June 1, 2026. Award to the Salvation Army, in the amount not to
exceed $504,949.07. This firm is located in Columbia, SC.
Funding Source: Homeless Services – Food and Provisions (1014501-624200). The
original budget amount is $504,949.07.
11. Council is asked to authorize the City Manager to Purchase Police Uniforms, as
requested by the Columbia Police Department on April 22, 2026. Award to Galls,
LLC, using the South Carolina State Contract in the amount of $270,000.00. This
vendor is located in Chicago, IL.
Funding Source: Police Administrative Services - Uniforms and Clothing (1012402-
624100). The original budget amount is $270,000.00.
12. Council is asked to authorize the City Manager to enter into new Sole Source
Contracts for several City Departments. Award to multiple vendors, in the total
amount of $2,457,604.29.
Item Description Vendor Term Amount
Page 3 of 26
a. Purchase
additional Water
Meters and
Cellular
Communication
Endpoints for
Advanced
Metering
Infrastructure
(AMI) for Water
Distribution and
Maintenance, as
requested by
Columbia Water
on April 22, 2026.
Badger Meter, Inc.
Milwaukee, WI
The initial term of
the contract will take
effect upon issuance
of the Notice to
Proceed with an end
date on June 30,
2027 and the option
to renew for five (5)
additional one-year
periods.
$1,701,739.29
Funding Source: Utilities Water Distribution and Maintenance — Meters, Parts, and Supplies
(5516203-625600). The original budget amount is $1,701,739.29.
b. Automated
Housing Condition
Analysis Year 1 for
the Code
Enforcement
Division, as
requested by the
Columbia Police
Department on
May 28, 2026.
City Detect, Inc.
Northport, AL
The initial term of
the contract will take
effect upon issuance
of the Notice to
Proceed with an end
date on June 30,
2027 and the option
to renew for one (1)
additional one-year
period.
$66,960.00
Funding Source: Police Administrative Services - Professional Services (1012402-636600). The
original budget amount is $66,960.00.
c. Purchase
Replacement Parts
for the Aeration
Basins at the
Metro Wastewater
Treatment Plant,
as requested by
Columbia Water
on May 26, 2026.
Evoqua Water
Technologies, LLC
Waukesha, WI
The initial term of
the contract will take
effect upon issuance
of the Notice to
Proceed with an end
date on June 30,
2027 and the option
to renew for one (1)
additional one-year
period.
$122,985.00
Funding Source: Utilities Metro Wastewater Plant — Pipe, Fittings, Hydrants, Etc. (5516208-
625700). The original budget amount is $122,985.00.
d. Annual
Subscription
Services for
ShotSpotter®
Gunshot Detection
System, as
requested by the
Columbia Police
Department on
May 21, 2026.
SoundThinking, Inc.
formerly known as
Shotspotter
Fremont, CA
The initial term of
the contract will take
effect upon issuance
of the Notice to
Proceed with an end
date on June 30,
2027 and the option
to renew for one (1)
additional one-year
period.
$565,920.00
Funding Source: Police Administrative Services — Subscription Based Technology Services
(1012402-632170). The original budget amount is $565,920.00.
Page 4 of 26
Total $2,457,604.29
13. Council is asked to authorize the City Manager to enter into a new Professional
Services Contract for Project SD850701; Marion Street Flood Study, as requested by
Columbia Water on April 23, 2026. Award to Kimley-Horn and Associates, Inc., in an
amount not to exceed $252,480.00. The initial term of the contract will take effect
upon issuance of the Notice to Proceed with an end date one (1) year from
commencement and the option to renew for one (1) additional one-year period. This
firm is located in Columbia, SC.
Funding Source: Storm Water Improvement Capital Project Control — Marion Street
Flood Study - Capital Project Costs (5549999-SD850701-658650). The original
budget amount is $252,480.00.
Kimley-Horn and Associates, Inc., is the prime and will provide engineering design
services at 89.78% ($226,676.54) of the total contract amount.
The following subcontractor(s) will provide additional services:
Carper Civil Consulting, LLC, a Minority Business Enterprise (W) located in
Columbia, SC, will provide public outreach and modeling services at 10.22%
($25,803.46) of the total contract amount.
14. Council is asked to authorize the City Manager to Purchase Annual Repair Materials
for the Water Distribution and the Wastewater Maintenance Divisions, as requested
by Columbia Water on January 15, 2026. Award to the following vendors in the total
amount of $1,427,961.89. The initial term of the contract will take effect upon
issuance of the Notice to Proceed with an end date one (1) year from
commencement and the option to renew for two (2) additional one-year periods.
Item Description Vendor Procurement Method Amount
a. Lots: 1,3-5, & 7
Wastewater Pipe,
Fittings, and
Materials
Lots: 11-25,and 27-
29 Water Pipe,
Fittings, and
Materials
Core and Main, LP
West Columbia, SC
BID022-25-26-LB $851,420.98
Funding Source: Utilities Wastewater Maintenance — Annual Wastewater Materials Bid Project
(5516205-625700) $133,377.00; Utilities Water Distribution and Maintenance — Annual Water
Materials Bid Project (5516203-625700) $718,043.98. The original budget amount is
$851,420.98.
b. Lot:2 Wastewater
Pipe, Fittings, and
Materials
Lots: 8-10, and 26
Water Pipe, Fittings,
and Materials
Ferguson
Waterworks
Elgin, SC
BID022-25-26-LB $545,009.66
Funding Source: Utilities Wastewater Maintenance — Annual Wastewater Materials Bid Project
Page 5 of 26
(5516205-625700) $67,535.19; Utilities Water Distribution and Maintenance — Annual Water
Materials Bid Project (5516203-625700) $477,474.47. The original budget amount is
$545,009.66.
c. Lot:6 Wastewater
Pipe, Fittings, and
Materials
Lots: 30-31 Water
Pipe, Fittings, and
Materials
Fortline, Inc.
Lexington, SC
BID022-25-26-LB $31,531.25
Funding Source: Utilities Wastewater Maintenance — Annual Wastewater Materials Bid Project
(5516205-625700) $2,818.75; Utilities Water Distribution and Maintenance — Annual Water
Materials Bid Project (5516203-625700) $28,712.50. The original budget amount is $31,531.25.
Total $1,427,961.89
15. Council is asked to authorize the City Manager to enter into Contract Amendment
#10 for Project WM4374; Columbia Canal Head Gates Repair Engineering Services,
as requested by Columbia Water on May 28, 2026. Award to Kleinschmidt
Associates in an amount not to exceed $64,500.00. The current term of the contract
ends on September 29, 2029. This firm is located in Lexington, SC.
Funding Source: Water & Sewer Capital Projects - Columbia Canal Head Gates
Repair - Capital Project Costs (5529999-WM437401-658650). The current budget
amount is $1,969,747.00. The budget amount for this amendment is $64,500.00.
The total revised budget amount is $2,034,247.00.
16. Council is asked to authorize the City Manager to enter into a new Construction
Contract for Project WM4886; 6-Inch Ductile Iron Pipe Water Main Construction at
Devine Street and Blossom Street, as requested by Columbia Water on April 28,
2026. Award to Carolina Tap and Bore, Inc., in an amount not to exceed
$141,234.00, which includes contingency. The initial term of the contract will take
effect upon issuance of the Notice to Proceed with an end date one hundred twenty
days (120) days from commencement. This contractor is located in West Columbia,
SC.
Funding Source: Water and Sewer Capital Projects - 6” Inch Water Main at Devine
and Blossom-Capital Project Costs (5529999-WM488601-658650). The original
budget amount is $141,234.00.
This is a Mentor Protégé Program project. Carolina Tap and Bore, Inc., is the mentor
and will provide utility construction oversight, locates, safety, traffic control and
clean-up services at 80.00% ($94,156.00) of the total contract amount.
LG Utility Contractors, Inc., a Minority Business Enterprise (W) located in Lugoff,
SC, is the protégé and will provide utility installation services at 20.00%
($23,539.00) of the total contract amount.
17. Council is asked to authorize the City Manager to enter into Contract Amendment
#1 for Project WM4830; Filter Rehabilitation and Electrical Upgrades at the Canal
and Lake Murray Water Treatment Plants, as requested by Columbia Water on May
11, 2026. Award to Black & Veatch Corporation, in an amount not to exceed
$266,460.00. The current term of the contract ends on February 18, 2028 and this
Page 6 of 26
amendment extends the contract to July 31, 2028. This firm is located in Columbia,
SC.
Funding Source: Water and Sewer Capital Projects - Columbia Canal Water
Treatment Plant Filter Rehab/Lake Murray Water Treatment Plant Electric - Capital
Project Costs (5529999-WM483001-658650). The current budget amount is
$774,500.00. The budget amount for this amendment is $266,460.00. The revised
budget amount is $1,040,960.00.
This is a Mentor Protégé Program project. Black & Veatch Corporation is the mentor
and will provide engineering design and construction phase services at 75.61%
($201,460.00) of the amendment amount.
Howard Engineering, Inc., a Minority Business Enterprise (W) located in Columbia,
SC, is the protégé and will provide preliminary engineering, bidding of electrical
gear and construction phase services at 24.39% ($65,000.00) of the amendment
amount.
18. Council is asked to authorize the City Manager to enter into Contract Amendment
#5 for Project SD8438; Professional Services for Queen Street Storm Drainage
Improvements - Phase II, as requested by Columbia Water on May 26, 2026. Award
to Black & Veatch Corporation, in an amount not to exceed $451,337.00. The
current term of the contract ends on June 30, 2026 and this amendment extends
the contract to September 13, 2028. This firm is located in Greenville, SC.
Funding Source: Storm Water Improvement Capital Project Control - Capital Project
Costs (5549999-658650). The original budget amount is $346,300.00. The budget
amount for this amendment is $451,337.00. The revised budget amount is
$797,637.00.
This is a Mentor Protégé Program project. Black & Veatch Corporation is the mentor
and will provide design, engineering, and bidding services at 71.22% ($321,427.00)
of the amendment amount.
CHA Consulting Corporation, located in Columbia, SC, is the protégé and will provide
utility coordination services, permitting services, and construction observation
services at 28.78% ($129,910.00) of the amendment amount.
19. Council is asked to Ratify three (3) Emergency Procurements, as requested by
several City Departments. Award to the lowest responsive bidder for each project in
the total amount of $878,831.17.
Item Description Vendor Amount
a. Project WM4869;
Replacement of a
waterline on Cox Street,
Brady Street, and Dodge
Street, as requested by
Columbia Water on
August 22, 2025.
Lake Murray Utility
Company, Inc.
Chapin, SC
$541,849.000
Funding Source: Water and Sewer Capital Projects — 6" Water Main Upgrade Cox/Brady/Dodge
Capital Project Costs (5529999-WM486901-658650). The original budget amount is
Page 7 of 26
$598,776.00.
b. Replacement parts for
repairs to Unit 25340
(HE011), as requested
by the Fleet Services
Division on March 27,
2026.
Spartan Fire and Emergency
Appartus
Roebuck, SC
$285,939.85
Funding Source: Equipment Services Fuel Parts and Repair - Repair Parts (6308970-672700).
The original budget amount is $285,939.85.
c. Replacement parts for
repair to the engine on
Unit 27283 (HE012), as
requested by the Fleet
Services Division on April
8, 2026.
Virginia Truck Center,
Inc. dba Excel Truck Group
Roanoke, VA
$51,042.32
Funding Source: Equipment Services Fuel Parts and Repair - Repair Parts (6308970-672700).
The original budget amount is $51,042.32.
Total $878,831.17
20. Council is asked to authorize the City Manager to enter into a Memorandum of
Agreement (MOA) 6-26 for Project WM4423 Columbia Avenue (Chapin) Corridor
Improvements with Water Line Installations and Relocations, as requested by
Columbia Water on May 18, 2026. Award to the South Carolina Department of
Transportation (SCDoT) in the amount of $4,420,893.20.
Funding Source: Water Capital Projects – S-48, Columbia Ave. (Chapin) Corridor
Improvement Waterline Installation & Relocation - Capital Project Cost (5529999-
WM4423-658650). The current budgeted amount is $4,766,678.20.
21. Ordinance No.: 2026-042 - Granting Third Renewal to MCImetro Access
Transmission Services, LLC, f/k/a MCImetro Access Transmission Services Corp., its
Successors and Assigns the Right, Power and Authority to Construct, Install,
Maintain and Operate In, Over, Upon and Under the Streets and Public Places of the
City of Columbia, its Lines, Poles, Wires, Cables and other Telecommunications
Facilities to Render Telecommunications Service to Its Customers in the Limits of
the City of Columbia for Such Period as Provided Herein; and to Provide for the
Payment of Compensation for the Use of the Streets and Public Places
First reading approval was given on June 9, 2026.
Fiscal Year 2026/2027 Contract Renewals
22. Council is asked to authorize the City Manager to enter into Fiscal Year 2026/2027
Contract Renewals for Public Safety Services. Award to the following vendors in the
total amount of $5,210,131.97.
Item Description Vendor Term Amount
Page 8 of 26
a. Palmetto 800 MHz Radio Airtime,
as requested by the Columbia Fire
Department on April 22, 2026.
Motorola
Solutions, Inc.
Lancaster, SC
Annual
renewal
(7/1/2026 -
6/30/2027)
$139,888.17
Funding Source: Fire Suppression — Other Lease/Rental (1012303-636500). The original budget
amount is $139,888.17.
b. Palmetto 800 MHz Radio Airtime,
as requested by the Columbia
Police Department on April 24,
2026.
Motorola
Solutions
Lancaster, SC
Annual
renewal
(7/1/2026 -
6/30/2027)
$398,594.16
Funding Source: Police Administrative Services - Other Lease/Rental (1012402-636500). The
original budget amount is $398,594.16.
c. Video Security Camera
Subscription Services, as
requested by the Columbia Police
Department on May 7, 2026.
Motorola
Solutions, Inc.
Chicago, IL
Year 4 of
initial 5-year
term (May 1,
2026 - April
30, 2027)
$1,540,071.00
Funding Source: Police Administrative Services - Subscription Based Technology Services
(1012402-632170); Police Administrative Services - Equipment Lease/Rental (1012402-
636400); Police Administrative Services - Professional Services (1012402-636600); Police
Administrative Services - Maintenance and Service Contract (1012402-636600). The original
budget amount is $1,540,071.00.
d. Security Guard Services, as
requested by the Columbia Police
Department on April 24, 2026.
Universal
Protection Service
LP / Allied
Universal
Philadelphia, PA
2nd of 2
options to
renew
(7/1/2026 -
6/30/2027)
$2,749,249.48
Funding Source: Police Administrative Services - Professional Services (1012402-636600)
$1,037,852.50; Community Safety Officers - Professional Services (5512703-636600)
$1,603,633.50; and Finlay Park Management - Professional Services (1015112-636600)
$107,763.48. The original budget amount is $2,749,249.48.
e. Records Management System /
Field Based Reporting / Mobile
licenses, as requested by the
Columbia Police Department on
May 15, 2026.
Central Square
Technologies
Lake Mary, FL
Annual
renewal
(7/1/2026 -
6/30/2027)
$264,803.63
Funding Source: Police Administrative Services – Maintenance and Service Contract (1012402-
638200). The original budget amount is $264,803.63.
f. Mobile Area Routing and Vehicle
Location Information System
(MARVLIS) Software Support, as
requested by the Columbia Police
Department on May 21, 2026.
Bradshaw
Consulting
Services, Inc.
Aiken, SC
Annual
renewal
(11/2/2026 -
11/1/2027)
$117,525.53
Funding Source: Police Administrative Services - Software License (1012402-627510). The
original budget amount is $117,525.53.
Total $5,210,131.97
23. Council is asked to authorize the City Manager to enter into Fiscal Year 2026/2027
Sole Source Contract Renewals. Award to the following vendors in the total amount
Page 9 of 26
of $5,435,107.61.
Item Description Vendor Term Amount
a. Equipment/Generator
Maintenance, Warranty,
and Inspections for the
Lake Murray Water
Treatment Plant, as
requested by Columbia
Water on April 21,
2026.
Blanchard
Machinery
West Columbia,
SC
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$89,363.12
Funding Source: Utilities Lake Murray Water Plant — Maintenance and Service Contract
(5516207-638200). The original budget amount is $89,363.12.
b. VAG, Morris, Rotork,
and Seepex
Parts/Service for the
Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23,
2026.
Heyward-
Charlotte Inc.
Charolotte, NC
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$340,800.00
Funding Source: Utilities Metro Wastewater Plant - Equipment Repair/Service Supply (5516208-
631800) $60,000.00; Utilities Metro Wastewater Plant - Machinery and Equipment - Capital
(5516208-658300) $205,200.00; and Utilities Metro Wastewater Plant - Small Hand Tools/Other
Equipment (5516208-623100) $75,600.00. The original budget amount is $340,800.00.
c. Caterpillar Parts,
Warranty Service,
Repair/Maintenance for
the Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23,
2026.
Blanchard
Machinery
West Columbia,
SC
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$250,000.00
Funding Source: Utilities Metro Wastewater Plant - Mainteance and Service Contract (5516208-
638200). The original budget amount is $250,000.00.
d. Repair Services, Parts,
and Maintenance for
Grundfos Pumps for the
Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23,
2026.
Charles
Underwood Inc.
Sanford, NC
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$152,000.00
Funding Source: Utilities Metro Wastewater Plant - Equipment Repair/Service Supply (5516208-
631800) $125,000.00 and Utilities Metro Wastewater Plant - Machinery and Equipment - Capital
(5516208-658300) $27,000.00. The original budget amount is $152,000.00.
e. Magnesium Hydroxide &
Rental Fees for the
Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23,
Premier
Magnesia, LLC
West
Conshohocken, PA
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$2,715,000.00
Page 10 of 26
2026.
Funding Source: Utilities Metro Wastewater Plant - Chemicals (5516208-624800) $2,700,000.00
and Utilities Metro Wastewater Plant - Equipment Lease/Rental (5516208-636400) $15,000.00.
The original budget amount is $2,715,000.00.
f. Envirex Jet-Tech &
Aqua-Lator parts,
service, and
maintenance for the
Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23,
2026.
Evoqua Water
Technologies, LLC
c/o Heyward
Incorporated
Waukesha, WI
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$138,400.00
Funding Source: Utilities Metro Wastewater Plant - Small Hand Tools/Other Equipment
(5516208-623100) $91,800.00; Utilities Metro Wastewater Plant - Equipment Repair/Service
Supply $25,000.00; and Utilities Metro Wastewater Plant - Machinery and Equipment - Capital
(5516208-658300) $21,600.00. The original budget amount is $138,400.00.
g. Maintenance/Service
Repairs for Camera
Trucks & Equipment for
the Wastewater
Maintenance Division,
as requested by
Columbia Water on April
22, 2026.
Jet Vac
Equipment Co.
Sumter, SC
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$54,000.00
Funding Source: Utilities Wastewater Maintenance - Special Departmental Supplies (5516205-
627100). The original budget amount is $54,000.00.
h. Flygt Pumps, Products,
Parts, Repairs, and
Maintenance for the
Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23,
2026.
Xylem Water
Solutions USA
Charlotte, NC
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$458,000.00
Funding Source: Utilities Metro Wastewater Plant - Machinery & Equipment - Capital (5516208-
658300) $216,000.00; Utilities Metro Wastewater Plant - Equipment Repair/Service Supply
(5516208-631800) $215,000.00; and Utilities Metro Wastewater Plant - Small Hand Tools/Other
Equipment (5516208-623100) $27,000.00. The original budget amount is $458,000.00.
i. Laboratory Supplies, as
requested by Columbia
Water on April 20,
2026.
IDEXX
Distributors
Westbrook, ME
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$62,182.21
Funding Source: Water Compliance - Laboratory Supplies (5516230-625000) The original budget
amount is $62,182.21.
j. Purate (Sodium
Chlorate/Hydrogen
Peroxide) for the Lake
Murray Water
Treatment Plant, as
Water Solutions
Azure Water
Services, LLC
West Haven, CT
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$150,000.00
Page 11 of 26
requested by Columbia
Water on April 16,
2026.
Funding Source: Utilities Lake Murray Water Plant - Chemicals (5516207-624800). The original
budget amount is $150,000.00.
k. Landfill Disposal for the
Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23,
2026.
Waste
Management of
SC
Elgin, SC
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$250,000.00
Funding Source: Utilities Metro Wastewater Plant - Special Contracts (5516208-638300). The
original budget amount is $250,000.00.
l. Five-Year Extended
Preventive Routine
Maintenance Plan for six
(6) Turbo Blowers for
the Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23,
2026.
APGN Inc.
Blainville, J7C 5S4
Canada
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$151,200.00
Funding Source: Utilities Metro Wastewater Plant - Maintenance and Service Contract (5516208
- 638200). The original budget amount is $151,200.00.
m. JWC Parts, products,
installation, and
maintenance for the
Metro Wastewater
Treatment Plant, as
requested by Columbia
Water on April 23, 2026
JWC
Environmental
Inc.
Santa Ana, CA
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$283,000.00
Funding Source: Utilities Metro Wastewater Plant - Maintenance and Service Contract (5516208-
638200) $40,000.00; Utilities Metro Wastewater Plant - Small Hand Tools/Other Equipment
(5516208-623100) $27,000.00; and Utilities Metro Wastewater Plant - Machinery and
Equipment - Capital (5516208-658300) $216,000.00. The original budget amount is
$283,000.00.
n. Chain & Flight Clarifier
Equipment for Train 1
for the Metro
Wastewater Treatment
Plant, as requested by
Columbia Water on May
27, 2026.
Evoqua Water
Technologies, LLC
c/o Heyward
Incorporated
Waukesha, WI
1st of 1 option to renew
(7/1/2026 - 6/30/2027)
$341,162.28
Funding Source: Utilities Metro Wastewater Plant - Small Hand Tools/Other Equipment
(5516208-623100). The original budget amount is $341,162.28.
Total $5,435,107.61
24. Council is asked to authorize the City Manager to enter into Fiscal Year 2026/2027
Columbia Water Contract Renewals and Extensions. Award to the following vendors
Page 12 of 26
in the total amount of $22,369,407.00.
Item Description Vendor Term Amount
a. Instrumentation
and Supervisory
Control and Data
Acquisition
(SCADA) System
Maintenance, as
requested by
Columbia Water
on April 24, 2026.
CITI, Inc.
Charlotte, NC
2nd of 5 options
to renew (July 1,
2026 - June 30,
2027)
$447,736.00
Funding Source: Utilities Lake Murray Water Plant - Professional Services (5516207-636600)
$46,368.00 and Utilities Columbia Canal Water Treatment Plant - Professional Services
(5516206-636600) $46,368.00. Utilities Metro Wastewater Plant - Maintenance and Service
Contract (5516208-638200) $355,000.00. The original budget amount is $447,736.00.
b. Water Tank
Repainting and
Maintenance, as
requested by
Columbia Water
on April 7, 2026.
Southern Corrosion,
Inc.
Roanoke Rapids, NC
3rd of 10
options to renew
(July 1, 2026 -
June 30, 2027
$998,264.00
Funding Source: Utilities Lake Murray Water Plant - Specials Contracts- Water/Sewer,
Stormwater (5516207-638305) $499,132.00; Utilities Columbia Canal Water Treatment Plant -
Special Contracts -Water/Sewer, Stormwater (5516206-638305) $499,132.00. The original
budget amount is $998,264.00
c. SS6966 Sanitary
Sewer Annual Pipe
Rehabilitation, as
requested by
Columbia Water
on April 13, 2026.
McClam and
Associates, Inc.
Little Mountain, SC
3rd of 3 options
to renew (July 1,
2026 - June 30,
2027)
$8,924,772.00
Funding Source: Water and Sewer Capital Projects - Annual Rehabilitation on Lines <15" -
Capital Project Costs (5529999-SS696626 - 658650). The original budget amount is
$8,924,772.00.
d. SS7619
Construction
Administration
and Observation
Services for
Annual Pipe
Rehabilitation, as
requested by
Columbia Water
on April 22, 2026.
Weston and
Sampson Engineers,
Inc.
Peabody, MA
Annual renewal
(July 1, 2026 -
June 30, 2027)
$430,000.00
Funding Source: Water and Sewer Capital Projects – Capital Project Costs (5529999-658650).
The original budget amount is $430,000.00.
e. SS7636 Solids
Handling
Professional
Support Services,
as requested by
Hazen and Sawyer
Columbia, SC
1st of 1 options
to renew (July 1,
2026 - June 30,
2027)
$258,000.00
Page 13 of 26
Columbia Water
on April 23, 2026.
Funding Source: Utilities Metro Wastewater Plant - Professional Services (5516208-636600). The
original budget amount is $258,000.00.
f. Utility Bill Printing
Services, as
requested by
Columbia Water
on April 21, 2026.
Matrix Imaging
Solutions, LLC
Coppell, TX
3rd of 4 options
to renew (July 1,
2026 - June 30,
2027)
$1,126,824.00
Funding Source: Customer Care - Postage and Delivery (5511407-631100) $850,950.00 and
Customer Care - Special Contracts (5511407-638300) $275,874.00. The original budget amount
is $1,126,824.00.
g. Answering
Services for
Customer Services
Department, as
requested by
Columbia Water
on April 23, 2026.
Answer Plus
Communication
Rotonda West, FL
Annual renewal
(July 1, 2026 -
June 30, 2027)
$53,000.00
Funding Source: Customer Care - Special Contracts (5511407-638300). The original budget
amount is $53,000.00.
h. Aggregate
Materials,
Concrete and
Crush Stone, as
requested by
Columbia Water
on April 14, 2026.
Vulcan Construction
Materials LP
Atlanta, GA
3rd of 4 options
to renew (July 1,
2026 - June 30,
2027)
$239,760.00
Funding Source: Utilities Wastewater Maintenance - Paving and Asphalt Supplies (5516205-
623500) $108,000.00 and Utilities Water Distribution and Maintenance - Paving and Asphalt
Supplies (5516203-623500) $131,760.00. The original budget amount is $239,760.00.
i. WM4818 Fire
Hydrant Repairs
and Replacements
in Districts 1 & 4,
as requested by
Columbia Water
on April 21, 2026.
Carolina Tap and
Bore Inc.
West Columbia, SC
1st of 4 options
to renew (July 1,
2026 - June 30,
2027)
$750,000.00
Funding Source: Water and Sewer Capital Projects - Capital Project Costs (5529999-658650).
The original budget amount is $750,000.00.
j. WM4817 Fire
Hydrant Repairs
and Replacements
in Districts 2, 3, &
5, as requested by
Columbia Water
on April 21, 2026.
Smoak Construction
Company LLC
Little Mountain, SC
1st of 4 options
to renew (July 1,
2026 - June 30,
2027)
$750,000.00
Funding Source: Water and Sewer Capital Projects - Capital Project Costs (5529999-658650).
The original budget amount is $750,000.00.
Page 14 of 26
k. Water Distribution
Contractor Crew
Extension of Staff,
as requested by
Columbia Water
on April 21, 2026.
Lake Murray Utility
Company, Inc.
Chapin, SC
1st of 3 options
to renew (July 1,
2026 - June 30,
2027)
$1,000,000.00
Funding Source: Utilities Water Distribution and Maintenance - Maintenance and Service
Contract (5516203-638200). The original budget is $1,000,000.00.
l. Memorandum of
Agreement for
Apprenticeship
Program Training,
as requested by
Columbia Water
on April 20, 2026.
Central Carolina
Technical College
Sumter, SC
5th of 9 options
to renew (July 1,
2026 - June 30,
2027)
$94,900.00
Funding Source: Utilities Wastewater Maintenance - Employee Training & Professional
Development (5516205-631200) $28,200.00; Utilities Water Distribution & Maintenance -
Employee Training & Professional Development (5516203-631200) $25,200.00; and Utilities
Metro Wastewater Plant - Employee Training and Professional Development (5516208-631200)
$41,500.00. The original budget amount is $94,900.00.
m. SS7604
Continuing Sewer
Assessment
Program (CSAP)
maintenance
assistance, as
requested by
Columbia Water
on April 13, 2026.
Gavel and Dorn
Engineering, LLC
Denver, NC
2nd of 4 options
to renew (July 1,
2026 - June 30,
2027)
$500,000.00
Funding Source: Utilities Wastewater Maintenance - Professional Service (5516205–636600).
The original budget amount is $500,000.00.
n. SS7604
Continuing Sewer
Assessment
Program (CSAP)
maintenance
assistance, as
requested by
Columbia Water
on April 13, 2026.
McKim and Creed,
Inc.
Raleigh, NC
2nd of 4 options
to renew (July 1,
2026 - June 30,
2027)
$525,000.00
Funding Source: Utilities Wastewater Maintenance - Professional Service (5516205–636600).
The original budget amount is $525,000.00.
o. Beaver Mitigation
and Maintenance,
as requested by
Columbia Water
on April 13, 2026.
McClam and
Associates, Inc.
Little Mountain, SC
1st of 4 options
to renew (July 1,
2026 - June 30,
2027)
$948,000.00
Funding Source: Utilities Wastewater Maintenance - Professional Services (5516205-636600).
The original budget amount is $948,000.00.
p. Screening, Grit, &
Sludge Hauling for
the Metro
Waste Management
of SC
Elgin, SC
3rd of 4 options
to renew (July 1,
2026 - June 30,
$1,500,000.00
Page 15 of 26
Wastewater
Treatment Plant,
as requested by
Columbia Water
on April 23, 2026.
2027)
Funding Source: Utilities Metro Wastewater Treatment Plant - Special Contracts (5516208-
638300). The original budget amount is $1,500,000.00.
q. Environmental
Sample Collection
Testing, as
requested by
Columbia Water
on April 23, 2026.
Alliance Technical
Group, LLC
Decatur, AL
2nd of 4 options
to renew (July 1,
2026 - June 30,
2027)
$233,926.00
Funding Source: Utilities Metro Wastewater Treatment Plant – Special Contracts (5516208–
638300) - $78,341.00 and Wastewater Compliance – Special Contracts (5516231–638300) -
$155,585.00. The original budget amount is $233,926.00.
r. SS7607 Metro
Wastewater
Treatment Plant
and Pump Station
Professional
Maintenance
Services, as
requested by
Columbia Water
on April 23, 2026.
Kemp Construction
Inc.
Sherrills Ford, NC
1st of 2 options
to renew (July 1,
2026 - August 1,
2026)
$100,000.00
Funding Source: Utilities Metro Wastewater Plant - Professional Services (5516208-636600). The
original budget amount is $100,000.00.
s. Badger Meter
Beacon Advanced
Metering Analytics
(AMA) Managed
Solutions, as
requested by
Columbia Water
on May 26, 2026.
Badger Meter, Inc.
Milwaukee, WI
5th of 20 options
to renew (July 1,
2026 – June 30,
2027)
$915,000.00
Funding Source: Meter Reading – Maintenance and Service Contract (5516202-638200). The
original budget amount is $915,000.00.
t. SS7591 Project
Management
Services, as
requested by
Columbia Water
on May 27, 2026.
Carper Civil
Consulting, LLC
Columbia, SC
Extension to
6/30/2027
$100,000.00
Funding Source: Engineering Water Systems Improvement – Professional Services (5516221-
636600). The original budget amount is $100,000.00
u. SS7591 Project
Management
Services, as
requested by
Columbia Water
AECOM
Columbia, SC
2nd of 2 options
to renew (July 1,
2026 - June 30,
2027)
$109,500.00
Page 16 of 26
on May 27, 2026.
Funding Source: Engineering Wastewater Systems Improvement Professional Service (5516221-
636600). The original budget amount is $109,500.00.
v. Sanitary Sewer
Manhole
Rehabilitation
SS6786; as
requested by
Columbia Water
on April 13, 2026.
Vortex Services
Greenville, SC
1st of 3 options
to renew (July 1,
2026 - June 30,
2027)
$2,298,725.00
Funding Source: Water and Sewer Capital Projects - Annual Gravity Sewer Manhole Lining
Capital Projects Costs (5529999-658650). The original budget amount is $2,298,725.00.
w. Metro Wastewater
Treatment Plant &
Compliance
Personnel
Training, as
requested by
Columbia Water
on May 29, 2026.
Brown and Caldwell
Columbia, SC
Extension to
12/31/2026
$66,000.00
Funding Source: Utilities Metro Wastewater Plant - Employee Training & Professional
Development (5516208-631200). The original budget amount is $66,000.00.
Total $22,369,407.00
25. Council is asked to authorize the City Manager to enter into Fiscal Year 2026/2027
Miscellaneous Contract Renewals and Extensions. Award to the following vendors in
the total amount of $4,421,345.74.
Item Description Vendor Term Amount
a. Annual
Subscription
Services for Utility
Billing Customer
Information
System, as
requested by the
Information
Technology
Department and
the Budget,
Program
Management and
Grants Office on
April 23, 2026.
Hansen Banner,
LLC
Allentown, PA
Annual renewal
(7/1/26 - 6/30/27)
$327,339.40
Funding Source: Program Management Office – Subscription Based Technology Services
(6218950-632170). The original budget amount is $327,339.40.
b. Annual
Subscription
Services for
Budgeting
ClearGov
Maynard, MA
Annual renewal
(7/1/26 - 6/30/27)
$108,865.35
Page 17 of 26
Software, as
requested by the
Budget, Program
Management and
Grants Office on
April 23, 2026.
Funding Source: Program Management Office — Subscription Based Technology Services
(6218950-632170). The original budget amount is $108,865.35.
c. Annual
Subscription
Services for
Enterprise
Permitting and
Licensing
Software, as
requested by the
Planning and
Development
Services
Department on
May 22, 2026.
Tyler Technologies
Dallas, TX
Annual renewal
(7/1/26 - 6/30/27)
$504,961.56
Funding Source: Engineering Administration – Subscription Based Technology Services
(5511701-632170) $114,747.84; Development Services – Subscription Based Technology
Services (1014101-632170) $134,416.80; Police Administrative Services – Subscription Based
Technology Services (1012402-632170) $116,008.20; Engineering Stormwater Improvement –
Subscription Based Technology Services (5534202-632170) $39,341.16; Program Management
Office - Subscription Based Technology Services (6218950-632170) $9,835.56; Information
Technology – Subscription Based Technology Services (1011120-632170) $3,132.00;
Engineering Administration - Professional Services (5511701-636600) $8,748.00; Development
Services - Professional Services (1014101 - 636600) $61,236.00; and Police Administrative
Services - Professional Services (1012402-636600) $17,496.00. The original budget amount is
$504,961.56.
d. Microsoft
Enterprise
Agreement, as
requested by the
Information
Technology
Department on
April 21, 2026.
SHI International
Piscataway, NJ
Annual renewal
(7/1/26 - 6/30/27)
$1,068,422.98
Funding Source: Information Technology — Subscription Based Technology Services (1011120-
632170). The original budget amount is $1,068,422.98.
e. DataGard -
Backup and
Disaster Recovery
Services, as
requested by the
Information
Technology
Department on
April 21, 2026.
Thinkgard, LLC
Pelham, AL
Annual renewal
(7/1/26 - 6/30/27)
$112,320.00
Funding Source: Information Technology — Maintenance and Service Contract (1011120-
638200). The original budget amount is $112,320.00.
Page 18 of 26
f. Advertising
Consulting, as
requested by the
Public Relations
Department on
April 23, 2026.
Crawford Strategy,
LLC
Greenville, SC
3rd of 4 options to
renew (7/1/26 -
6/30/27)
$182,160.00
Funding Source: Public Relations - Professional Services (1011118-636600) $30,360.00;
Hospitality Special Projects - Professional Services (2128418-636600) $30,360.00; Marketing
and Promotion - Professional Services (2195206-636600) $30,360.00; Public Information -
Professional Services (5511305 - 636600)$30,360.00; Police Adminstrative Services -
Professional Services (1012402-636600) $30,360.00; and Accommodations Tax 5% -
Professional Services (2035205-636600) $30,360.00. The original budget amount is
$182,160.00.
g. Citywide Safety
Footwear Mobile,
as requested by
Procurement and
Contracts on May
19, 2026.
Saf-Gard Safety
Shoe Company
Greensboro, NC
2nd year of initial 3-
year term (7/1/26 -
6/30/27)
$350,000.00
Funding Source: Supplies - Safety Clothing and Supplies (6208956 - 625900). The original
budget amount is $350,000.00.
h. Citywide Rental of
Uniforms, Mats,
Rags, Shop
Towels, and
Wiping Cloths, as
requested by
Procurement and
Contracts on May,
19, 2026.
Unifirst Corporation
Lexington, SC
1st of 4 options to
renew (7/1/26 -
6/30/27)
$422,328.72
Funding Source: Supplies - Uniforms and Clothing (6208956-624100). The original budget
amount is $422,328.72.
i. Landfill Services
for Disposal of
Materials, as
requested by the
Public Works
Department on
April 13, 2026.
Waste Management
of SC
Elgin, SC
1st of one 5-year
renewal option
(7/1/26 - 6/30/27)
$440,000.00
Funding Source: Solid Waste Disposal - Solid Waste Tipping Fee (6208955-631900). The original
budget amount is $440,000.000.
j. Compost Grinding
and Screening
Services, as
requested by the
Public Works
Department on
April 13, 2026.
Kriss Carolina
Landscape
Supplies, Inc.
Columbia, SC
2nd of 2 options to
renew (7/1/26 -
6/30/27)
$260,000.00
Funding Source: Solid Waste Compost – Special Projects (1014406-638500). The original budget
amount is $260,000.00.
Page 19 of 26
k. Disposal of
Recycled
Materials, as
requested by the
Public Works
Department on
April 13, 2026.
SONOCO Recycling,
LLC
Hartsville, SC
Year 2 of 5-year
extended term
(7/1/26 - 6/30/27)
$350,000.00
Funding Source: Solid Waste Recycling - Solid Waste Tipping Fee (1014407-631900). The
original budget amount is $350,000.00.
l. Annual
Subscription
Services E-
Recruitment and
Onboarding
System, as
requested by the
Human Resources
Department on
May 22, 2026.
NeoGov
El Segundo, CA
Annual renewal
(7/1/26 - 6/30/27)
$238,703.37
Funding Source: Program Management Office - Subscription Based Technology Services
(6218950-632170). The original budget amount is $238,703.37.
m. Annual
Subscription
Services Teller
Software Licenses
and Point of Sale
System, as
requested by the
Finance
Department on
April 29, 2026.
CanAm
Technologies, Inc.
Lakewood, CO
Annual renewal
(7/1/26 - 6/30/27)
$56,244.36
Funding Source: Collections - Subscription Based Technology Services (5511406-632170). The
original budget amount is $56,244.36.
Total $4,421,345.74
26. Council is asked to authorize the City Manager to enter into Fiscal Year 2026/2027
Indefinite Delivery Contract (IDC) renewals for Asphalt and Concrete Repair and
Restoration Services, as requested by Columbia Water. Award to the following firms
in the total amount of $2,000,000.00. Project specific administration shall be
required, executed, and issued for each asphalt and concrete repair or restoration
project awarded under the approved IDC.
Item Description Vendor Term
a. Asphalt and Concrete Repair and
Restoration Services as requested by
Columbia Water on May 11, 2026.
AOS
Specialty
Contractors,
Inc.
Lexington,
SC
1st renewal of 4 options to
renew (7/1/2026 -
6/30/2027)
Funding Source: Engineering - Water System Improvements - Special Projects (5516220-
638500).
Page 20 of 26
b. Asphalt and Concrete Repair and
Restoration Services as requested by
Columbia Water on May 11, 2026.
C. R.
Jackson, Inc.
Columbia, SC
1st renewal of 4 options to
renew (7/1/2026 -
6/30/2027)
Funding Source: Engineering - Water System Improvements - Special Projects (5516220-
638500).
c. Asphalt and Concrete Repair and
Restoration Services as requested by
Columbia Water on May 11, 2026.
L-J, Inc.
Cayce, SC
1st renewal of 4 options to
renew (7/1/2026 -
6/30/2027)
Funding Source: Engineering - Water System Improvements - Special Projects (5516220-
638500).
27. Council is asked to authorize the City Manager to enter into Fiscal Year 2026/2027
Indefinite Delivery Contract (IDC) renewals for Waterline/Hydrant Leak Restoration
Services, as requested by Columbia Water. Award to the following firms in the total
amount of $5,000,000.00. Project specific administration shall be required,
executed, and issued for each waterline/hydrant leak restoration service project
awarded under the approved IDC. Projects awarded under these Indefinite Delivery
Contracts from the Columbia Water Pre-approved Contractors Listing will utilize the
Mentor Protégé Program, requiring a minimum 20% of the project to be completed
by the protégé.
Item Description Vendor Term Amount
a. IDC for Waterline Hydrant
Repairs, as requested by
Columbia Water on April
15, 2026.
Lake Murray
Utility
Company
Chapin, SC
3rd Renewal of 4 options
to renew (7/1/26 –
6/30/27)
$1,700,000.00
Funding Source: Utilities Water Distribution & Maintenance - Special Projects (5516203-638500).
The original budget amount is $1,700,000.00.
b. IDC for Waterline Hydrant
Repairs, as requested by
Columbia Water on April
15, 2026.
LAD
Construction
Swansea, SC
3rd Renewal of 4 options
to renew (7/1/26 –
6/30/27)
$200,000.00
Funding Source: Utilities Water Distribution & Maintenance - Special Projects (5516203-638500).
The original budget amount is $200,000.00.
c. IDC for Waterline Hydrant
Repairs, as requested by
Columbia Water on April
15, 2026.
G.H. Smith
Construction
Columbia, SC
3rd Renewal of 4 options
to renew (7/1/26 –
6/30/27)
$1,700,000.00
Funding Source: Utilities Water Distribution & Maintenance - Special Projects (5516203-638500).
The original budget amount is $1,700,000.00.
d. IDC for Waterline Hydrant
Repairs, as requested by
Columbia Water on April
15, 2026.
Carolina Tap
and Bore, Inc.
West
Columbia, SC
3rd Renewal of 4 options
to renew (7/1/26 –
6/30/27)
$1,400,000.00
Funding Source: Utilities Water Distribution & Maintenance - Special Projects (5516203-638500).
The original budget amount is $1,400,000.00.
Page 21 of 26
Total $5,000,000.00
28. Council is asked to authorize the City Manager to enter into Fiscal Year 2026/2027
Contract Renewals for the Purchase of Chemicals for the Water and Wastewater
Treatment Plants. Award to the following vendors in the total amount of
$9,851,136.00.
Item Description Vendor Procurement Method Amount
a. Chlorine (Liquid), as
requested by Columbia
on April 16, 2026.
JCI Jones
Chemicals, Inc.
Sarasota, FL
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$1,157,535.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$594,000.00 and Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$563,535. The original budget amount is $1,157,535.00.
b. Sodium Hypochlorite;
and Sodium Bisulfite, as
requested by Columbia
Water on April 23,
2026.
JCI Jones
Chemicals Inc.
Sarasota, FL
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$1,512,000.00
Funding Source: Metro Wastewater Treatment Plant - Chemicals (5516208-624800). The original
budget amount is $1,512,000.00.
c. Anhydrous Ammonia
(Liquid), as requested
by Columbia Water on
April 16, 2026.
Airgas Specialty
Products Inc
Lawrenceville, GA
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$274,000.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$170,000.00 and Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$104,000.00. The original budget amount is $274,000.00.
d. Sodium Hydroxide
(Caustic Soda), as
requested by Columbia
Water on April 16,
2026.
Univar USA, Inc.
Spartanburg, SC
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$164,675.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$56,000.00 and Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$108,675.00. The original budget amount is $164,675.00.
e. Fluoride/Fluorosilicic
Acid, as requested by
Columbia Water on April
16, 2026.
Univar USA, Inc.
Spartanburg, SC
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$160,800.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$60,000.00 and Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$100,800.00. The original budget amount is $160,800.00.
f. Liquid Lime (Calcium
Hydroxide), as
Polytec
Incorporated
1st renewal of 1 option
to renew (7/1/2026 -
$766,200.00
Page 22 of 26
requested by Columbia
Water on April 16,
2026.
Mooresville, NC 6/30/2027)
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$384,000.00 and Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$382,200.00. The original budget amount is $766,200.00.
g. Liquid Polymer/250-
gallon, as requested by
Columbia Water on April
16, 2026.
Polydyne, Inc.
Riceboro, GA
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$1,067,640.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$9,000.00; Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$32,640.00; and Utilities Metro Wastewater Treatment Plant - Chemicals (5516208 - 624800)
$1,026,000.00. The original budget amount is $1,067,640.00.
h. Activated Carbon
(Powdered), as
requested by Columbia
Water on April 16,
2026.
ARQ Purification,
LLC
Greenwood
Village, CO
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$2,121,800.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$275,000.00 and Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$1,846,800.00. The original budget amount is $2,121,800.00.
i. Blended
Phosphate/Corrosion
Inhibitor, as requested
by Columbia Water on
April 16, 2026.
Carus LLC,
Peri, IL
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$447,480.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$162,000.00 and Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$285,480.00. The original budget amount is $447,480.00.
j. Sodium Chlorite
(Liquid), as requested
by Columbia Water on
April 16, 2026.
International
Dioxide Inc.,
North Kingstown,
RI
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$768,000.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800).
The original budget amount is $768,000.00
k. Aluminum Sulfate
(Alum), as requested by
Columbia Water on April
16, 2026.
Chemtrade
Chemicals
Corporation
Parsippany, NJ
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$1,325,527.00
Funding Source: Utilities Columbia Canal Water Treatment Plant - Chemicals (5516206-624800)
$720,000.00 and Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800)
$605,527.00. The original budget amount is $1,325,527.00.
l. Sulfuric Acid 78%
(Liquid), as requested
by Columbia Water on
April 16, 2026.
Southern States
Chemical Inc.,
Savannah, GA
1st renewal of 1 option
to renew (7/1/2026 -
6/30/2027)
$85,479.00
Funding Source: Utilities Lake Murray Water Treatment Plant - Chemicals (5516207-624800).
The original budget amount is $85,479.00.
Page 23 of 26
Total $9,851,136.00
29. Council is asked to authorize the City Manager to enter into Fiscal Year 2026/2027
Contract Renewals for Professional Janitorial Services. Award to the following
vendors in the total amount of $782,872.32.
Item Description Vendor Term Amount
a. Professional Janitorial
Services, as requested
by the Support Services
Division on April 24,
2026.
Low 7 Consulting,
LLC
Blythewood, SC
2nd renewal of 3 options
to renew (7/1/2026 -
6/30/2027)
$69,000.00
Funding Source: General Support Services - Maintenance & Service Contract (1011201-638200).
The original budget amount is $69,000.00.
b. Professional Janitorial
Services, as requested
by the Support Services
Division on April 24,
2026.
American Facility
Services, Inc.
Alpharetta, GA
3rd renewal of 4 options
to renew (7/1/2026 -
6/30/2027)
$324,431.40
Funding Source: Purchasing - Maintenance and Service Contract (6228959-638200) $14,029.80;
Police Administrative Services - Maintenance and Service Contract (1012402-638200)
$49,837.68; General Support Services - Maintenance and Service Contract (1011201-638200)
$212,155.92; and Streets Storm Drains - Maintenance and Service Contract (5534203-638200)
$48,408.00. The original budget amount is $324,431.40.
c. Professional Janitorial
Services, as requested
by the Support Services
Division on April 24,
2026.
Dubose Cleaning
Columbia, SC
3rd renewal of 4 options
to renew (7/1/2026 -
6/30/2027)
$209,783.52
Funding Source: General Support Services - Maintenance and Service Contract (1011201-
638200) $128,513.52; Police Administrative Services - Maintenance and Service Contract
(1012402-638200) $65,016.00; and Support Services - Building - Maintenance Service Contract
(5511219-638200) $16,254.00. The original budget amount is $209,783.52.
d. Professional Janitorial
Services, as requested
by the Support Services
Division on April 24,
2026.
Carolina Kwik Dry,
LLC
Columbia, SC
3rd renewal of 4 options
to renew (7/1/2026 -
6/30/2027)
$106,895.40
Funding Source: Police Administrative Services - Maintenance and Service Contract (1012402-
638200) $50,429.40; Utilities Metro Wastewater Plant - Maintenance and Service Contract
(5516208-638200) $12,593.04; Parking Operations - Maintenance and Service Contract
(5312413-638200) $23,189.04; and General Support Services - Maintenance and Service
Contract (1011201-638200) $20,683.92. The original budget amount is $106,895.40.
e. Professional Janitorial
Services, as requested
by the Support Services
Division on April 24,
2026.
Carolina Premier
Cleaning
Columbia, SC
3rd renewal of 4 options
to renew (7/1/2026 -
6/30/2027)
$72,762.00
Funding Source: Rapid Shelter Homeless - Maintenance and Service Contract (1014501-638200)
Page 24 of 26
$49,500.00; Police Administrative Services - Maintenance and Service Contract (1012402-
638200) $13,902.00; Parking Facilities - Maintenance and Service Contract (5312501-638200)
$5,280.00; and Parking Freed Street Deck - Maintenance and Service Contracts (5313117 -
638200) $4,080.00. The original budget amount is $72,762.00.
Total $782,872.32
Public Hearing & First Reading for Zoning / Planning Matters
30. ANNEXATION, FUTURE LAND USE MAP AMENDMENT, AND ZONING MAP
AMENDMENT for 3956 Fernandina Road and NX 3956 Fernandina Road; TMS#
04913-04-11, 04913-04-15, and 04913-04-14
Ordinance No.: 2026-046 - Annexing 3956 Fernandina Road and NX 3956
Fernandina Road, Richland County and Lexington County TMS # 04913-04-11,
04913-04-15, and 04913-04-14 into the City of Columbia, South Carolina, and
Incorporating said property into Columbia Compass: Envision 2036 and the Official
Zoning Map
Council District: 1
Plan Number: ANNEX-2025-0010
Proposal: Request to annex the properties and assign the land use classification of
Community Activity Corridor (AC-2) and Urban Edge Residential Large Lot (UER-2)
and assign the zoning of General Commercial District (GC) and Large Lot - Reserve
District (LL-R) for a pending annexation. The property is currently classified as
Mixed Residential (High Density) by Richland County and Destination Retail by
Lexington County and zoned General Commercial District (GC) by Richland County
and Intensive Development (ID), Collector Street (C) and Neighborhood Appearance
District (NAD) by Lexington County.
Applicant: Store Master Funding XXXIII, LLC / Alex Perry, Tidal Wave Auto Spa
Staff Recommendation: Approval
PC Recommendation: 5/14/2026; Approval (7-0)
31. ANNEXATION, FUTURE LAND USE MAP AMENDMENT, AND ZONING MAP
AMENDMENT for 730 and 800 Kennerly Road, TMS# 05101-02-08 and 05101-02-06
Ordinance No.: 2026-047 - Annexing 730 and 800 Kennerly Road, Richland County
TMS # 05101-02-08 and 05101-02-06 into the City of Columbia, South Carolina,
and Incorporating said property into Columbia Compass: Envision 2036 and the
Official Zoning Map
Council District: 1
Plan Number: ANNEX-2026-0006
Proposal: Request to annex the properties and assign the land use classification of
Urban Edge Residential Large Lot (UER-2) and assign the zoning of Mixed Use
Page 25 of 26
District (MU-1) for a pending annexation. The property is currently classified as
Neighborhood (Medium Density) and zoned Residential Transition (RT) by Richland
County.
Applicant: Paul D. Wade and Tamera K. Ricciardi-Wade/ Odyssey of Life Counseling,
LLC
Staff Recommendation: Denial; See reasoning in Staff Recommendations below
PC Recommendation: 05/14/2026; (7-0) Denial of the proposed Zoning District
(Mixed Use District (MU-1)) and Approval of the Future Land Use Classification
(Urban Edge Residential Large Lot (UER - 2)) for this pending annexation.
32. ANNEXATION, FUTURE LAND USE MAP AMENDMENT, AND ZONING MAP
AMENDMENT for 1010, 1014, 1018, 1022, and 1026 Dreyfus Road, Rear Dreyfus
Road, 34 Bluff Road, and NX 34 Bluff Road, TMS# 11301-17-01, 11301-17-02,
11301-17-03, 11301-17-04, 11301-17-05, 11301-17-10, 11301-18-06, and 11301-
18-07
Ordinance No.: 2026-048 - Annexing 1010, 1014, 1018, 1022, and 1026 Dreyfus
Road, Rear Dreyfus Road, 34 Bluff Road, and NX 34 Bluff Road, Richland County
TMS # 11301-17-01, 11301-17-02, 11301-17-03, 11301-17-04, 11301-17-05,
11301-17-10, 11301-18-06, and 11301-18-07 into the City of Columbia, South
Carolina, and Incorporating said property into Columbia Compass: Envision 2036
and the Official Zoning Map
Council District: 3
Plan Number: ANNEX-2026-0007
Proposal: Request to annex the properties and assign the land use classification of
Urban Core Mixed Residential Type 3 (UCMR-3) and assign the zoning of Mixed Use
District (MU-1) with portions in Floodplain Overlay District (OV-FP) and Floodway
Overlay District (OV-FW) for a pending annexation. The property is currently
classified as Mixed Residential (High Density) and zoned Light Industrial (M-1) and
Residential Transition (RT) by Richland County.
Applicant: Clayton Kennedy
Staff Recommendation: Approval
PC Recommendation: 5/14/2026; Approval (7-0)
Ordinances - First Reading
33. Ordinance No.: 2026-043 - Granting an encroachment to Hampton & Main LLC for
the use of the right of way area of the 1200 block of Hampton Street for the
installation and maintenance of a shade tree and irrigation adjacent to 1500 Main
Street, Richland County TMS# 09014-09-16
34. Ordinance No.: 2026-049 - Granting an encroachment to Michael McMullen for the
use of the right of way areas of the 2300 block of Duncan Street and the 300 block
Page 26 of 26
of Princess Street for the installation and maintenance of landscaping and irrigation
adjacent to 2323 Duncan Street, Richland County TMS# 11311-04-07
Appointments
35. Midlands Authority for Conventions, Sports, and Tourism
Other Matters
36. Proposed Special Revenue Allocations — Ms. Missy Caughman, CPM, MPA, Assistant
City Manager / Strategic Initiatives & Innovation
• Accommodations Tax Advisory Committee Recommendations
• Hospitality Tax Advisory Committee Recommendations
• Line-Item Agencies
• External Requests
City Council Committee Reports, Referrals and New Business
Public Input
Individuals are allotted up to three minutes to address City Council about matters not
on the agenda. Items requiring a public hearing cannot be addressed at this time.
Adjournment
Source: City of Columbia website. First collected Oct 14, 2026.