MUNICIPAL BUDGET
FISCAL YEAR 2022-2023
City of West Columbia
South Carolina
TABLE OF CONTENTS
Section 1 ................................ T ransmittal Letter
Section 2 ................................ Budget Summaries
Section 3 ................................ Debt Service Schedule
Section 4 ................................ Rate T ables and Fee Schedules
Section 5 ................................ Capital Improvement Project Listings
Section 6 ................................ State Health Plan Premiums Detail
S
E
C
T
I
O
N
1
TRANSMITTAL LETTER
June 7, 2022
To: Mayor and City Council
From: Brian Carter, City Administrator
Re: Budget Proposal for FY 20 22-2023
The operating budgets for Fiscal Year 2022-2023 are being submitted as you
requested for the General Fund and Water/Sewer Fund. Highlights of the estimated
revenues are as follows.
These budgets include our general funding sources with funding from increases in
revenue and lease purchase financing. The General Fund property tax revenue was
estimated using 66.241 in operating mils and 6.6 in debt service mils. The proposed
budget includes a projected 7.444 mil increase in operating millage. This is an
estimated $650,000 increase in operating tax revenue that is directly related to
expanding the availability of resources in police, sanitation, and other services. The
6.6 mils are collected and earmarked for the debt retirement of the 2020 General
Obligation Bond. The overall increase in General Fund revenue over the prior year is
$930,000.
General Fund Revenue Source Amounts % of Total
Property Taxes 7,500,000$ 35.7%
Business License and Franchise Fees 5,750,000 27.4%
State Rebates 615,000 2.9%
Hydrant and Fire Protection Fees 1,017,600 4.8%
Police Fines and Fees 129,000 0.6%
Permits, Interest, Miscellaneous Revenue 670,500 3.2%
Transfers from Other Funds (W/S & H-tax) 4,305,000 20.5%
Anticipated Grant Funds / Program Income 126,500 0.6%
Sale of Assets / Other Funding Sources 901,400 4.3%
Total 21,015,000$ 100%
Water / Sewer Fund Revenue Source
Water and Sewer Service 20,300,000$ 93.7%
Tap Fees and Penalties 800,000 3.7%
Interest / Miscellaneous Revenue 162,000 0.7%
Receivable - Joint Municipal Water and Sewer 388,000 1.8%
Sale of Assets / Other Funding Sources 10,000 0.0%
Total 21,660,000$ 100%
Budget Transmittal Memorandum
June 7, 2022
Page Two
The Water/Sewer revenue was estimated using the rate ordinance approved in March 2018. The fee structures
for water and sewer rates have been included. This budget also includes the continuation of the Quail Hollow
Sewer System Surcharge. The recommended FY 2022-2023 transfer to the General Fund from the Water/Sewer
Fund is $3,255,000 and is in accordance with the City’s financial policies.
The City will borrow money to fund vehicle and equipment requests in the General Fund through lease purchase
financing. The total of these requests is $745,000. The Water/Sewer Fund equipment requests included are
funded without the need for additional debt service.
Requested Budget Items:
The requested budget plan includes funding for up to a 3% merit pay increase for employees to be awarded on
employees’ employment anniversary dates, subject to a satisfactory performance evaluation. Also included in
the budget plan is a 1% across the board cost-of-living increase for all employees to be awarded July 1, 2022,
as well as a 1% across the board cost-of-living bonus for all employees to be paid in July 2022. The cost of
these increases is $410,000 for General Fund and $205,000 for Water/Sewer Fund.
In response to legislation impacting the state’s pension systems, we have budgeted a 1% increase for
employer contributions to SCRS and PORS. This represents an overall increase of $130,000 for required
employer contributions. Only the state legislature has the authority to set employee or employer
contribution rates; therefore, the city does not have the ability to change the amount of the employer’s
contribution. This increase impacts the general fund and the water/sewer fund.
The City has been a part of the S.C. State Health Insurance Plan since July 1, 2011, which is in the Blue
Cross/Blue Shield network. The summary below is for the projected coverages under the State’s standard
plan.
Annual Deductible: $490 Individual / $980 Family
In-network Co-insurance: 80/20
Out of network Co-insurance: 60/40
Per Occurrence Deductible: $14 Office Visit
Network Retail Pharmacy: $9 Generic / $42 Preferred / $70 Non-Preferred
This calendar year’s premiums under the State Health Plan are projected with an increase of 18.1% in the
employer’s portion, as well as a 19% increase due to the City’s experience rating. As it has done in the past,
I recommend that the City continue to pay the employees’ part of the monthly premium for health insurance
and that cost has been included in this budget. There is a slight increase in the amount employees pay
towards the premium due to the experience rating. The City’s total cost for health insurance premiums for
fiscal year 2022-2023 is estimated at $2,570,000. This represents a City-wide increase of $730,000 over the
prior year.
Budget Transmittal Memorandum
June 7, 2022
Page Three
Requested Budget Items (continued):
The projected cost of fleet insurance, property, and tort liability insurance is provided through SCMIRF.
The premium for this coverage is $424,700. The South Carolina Municipal Insurance Trust is the provider
for the City’s workers compensation coverage. The premium for workers compensation coverage is based
upon claims and safety experience and is indexed to salaries. The City’s projected premium for workers
compensation coverage is approximately $287,500 for FY 2022-2023. In an exchange for a reduction in
premium, we kept the same deductibles to be paid upon each claim filed. Deductibles are allocated to
departments, which will assist with tracking losses and claims per department.
Departmental line-item budget requests including equipment/debt service are attached for your review.
These requests total $21,015,000 for the General Fund and $21,660,000 for the Water/Sewer Fund.
The General Fund budget includes a new Code Compliance Inspector for Code Enforcement, two new
Dispatchers for the Police Department, a new Truck Driver and Equipment Operator III for the Sanitation
Department, two new Equipment Operators for the Parks Department, a new Mechanic position for the
Maintenance Shop, and a new Permit/Plan Reviewer position for Planning and Zoning. All these positions
are in line with Council’s Goals and Priorities and/or Efficiency Study recommendations. The Water/Sewer
Fund budget includes two new Equipment Operators for the Water Department and a new Sewer Program
Technician for the Sewer Department.
The City’s 10-year Capital Improvement Plans for both the General Fund and Water/Sewer Fund are
included in Section 5.
The Special Revenue Fund budget includes Hospitality Tax funding and expenditures in the amount of
$2,200,000. A table showing FY 2022-2023 amounts is included in Section 2.
Other proposed expenditures included in the budget, which I have noted for your information are:
Membership – The River Alliance $ 12,500
Dues to Central Midlands Council of Governments 11,500
Contribution to Boys State and Girls State 2,500
Contribution to the West Metro Visitors’ Center (A-Tax Funds) 35,000
Contribution to Midlands Housing Authority – Transitions Shelter 17,000
Contribution to Riverkeeper 10,000
Contribution to Pawmetto Lifeline for Animal Services 25,000
Debt Service – TIF Bond 629,500
Debt Service – GO Bond 432,000
Columbia Sewer Treatment Costs 945,000
Bonded Debt Service - Water and Sewer Fund 3,958,000
S
E
C
T
I
O
N
2
BUDGET SUMMARIES
Revenue Type FY 2023 Amounts
Property Taxes 7,500,000$
Business License and Franchise Fees 5,750,000
State Rebates 615,000
Hydrant and Fire Protection Fees 1,017,600
Police Fines and Fees 129,000
Permits, Interest, Miscellaneous Revenue 670,500
Transfers from Other Funds (W/S & H-tax) 4,305,000
Anticipated Grant Funds / Program Income 126,500
Sale of Assets / Other Funding Sources 901,400
Total 21,015,000$
Department FY 2023 Requests
Mayor and Council 312,900$
Inspection Division 306,300
Codes Compliance 385,200
Administration 2,138,400
Court Administration 386,900
Information Technology 490,800
Community & Economic Development 203,200
Police Administration 5,059,300
Detective Division 1,428,900
Dispatch 487,900
Victims Advocate / Victims Services 113,000
Animal Control 89,500
School Resource Officers 216,300
Police Other 16,500
Fire Department 3,229,400
Street Department 631,600
Sanitation Department 2,398,700
Maintenance Shop 738,500
Parks Department 1,320,200
Transfer to Debt Retirement 1,061,500
Total 21,015,000$
City of West Columbia
Summary of Budget
FY 2022-2023
General Fund - Expenditures
General Fund - Revenues
City of West Columbia
Summary of Budget
FY 2022-2023
Revenue Type FY 2023 Amounts
Water and Sewer Service 20,300,000$
Tap Fees and Penalties 800,000
Interest / Miscellaneous Revenue 162,000
Receivable - Joint Municipal Water and Sewer 388,000
Sale of Assets / Other Funding Sources 10,000
Total 21,660,000$
Department FY 2023 Requests
Water / Sewer Administration 1,561,200$
Water Plant #1 1,738,400
Water Plant #2 5,203,600
Water Distribution 1,804,600
Sewer Collection 2,239,900
Water Billing and Collection 791,500
Information Technology 371,000
Water / Sewer Mayor and Council 167,900
Water / Sewer Maintenance Shop 369,500
Contribution to General Fund 3,255,000
Transfer to Reserve Fund 200,000
Transfer to Debt Retirement 3,957,400
Total 21,660,000$
Water and Sewer Fund - Expenditures
Water and Sewer Fund - Revenues
City of West Columbia
Summary of Budget
FY 2022-2023
Revenue Type FY 2023 Amounts
Hospitality Tax Revenues 2,200,000$
Total 2,200,000$
Expenditure Category FY 2023 Requests
Festivals and Events 220,000$
Other Professional Services and Promotion 50,000
Debt Service - New Bond Issue 460,000
Contribution to General Fund - Tourism Related
Event Management 175,000
Parks Operations and Maintenance 875,000
Christmas and Production Improvements 105,000
Other Projects and Improvements 315,000
Total 2,200,000$
Special Revenue (HTax) Fund - Revenues
Special Revenue (HTax) Fund - Expenditures
S
E
C
T
I
O
N
3
DEBT SERVICE SCHEDULE
CITY OF WEST COLUMBIA
DEBT SERVICE SCHEDULE
FISCAL YEAR 2022/2023
Payment Grand
Date Principal Interest Total Principal Interest Total Total
GENERAL FUND
Lease-Purchase - CresCom ($1M) 9/1/2022 5 of 7 145,282 8,100 153,382
Police Department 25% 36,321 2,025 38,346 38,346
Fire Department 5% 7,264 405 7,669 7,669
Sanitation Department 20% 29,056 1,620 30,676 30,676
72,641 4,050 76,691 76,691
Lease-Purchase - BB&T ($870,000) 11/24/2022 6 of 7 128,791 4,757 133,548
Police Department 18% 23,182 856 24,039 24,039
Fire Department 7% 9,015 333 9,348 9,348
Street Department 4% 5,152 190 5,342 5,342
Sanitation Department 65% 83,714 3,092 86,806 86,806
Parks Department 6% 7,727 285 8,013 8,013
128,791 4,757 133,548 133,548
GO Bond 2020 9/1/2022 3 of 10 - 18,993 18,993 18,993
3/1/2023 3 of 10 394,000 18,993 412,993 412,993
394,000 37,986 431,986 431,986
TIF Bond 2016 9/1/2022 6 of 11 - 49,227 49,227 49,227
3/1/2023 7 of 12 531,000 49,227 580,227 580,227
531,000 98,454 629,454 629,454
Total:General Fund 1,126,432 145,247 1,271,679 1,271,679
City of West Columbia
CITY OF WEST COLUMBIA
DEBT SERVICE SCHEDULE
FISCAL YEAR 2022/2023
Payment Grand
Date Principal Interest Total Principal Interest Total Total
City of West Columbia
PROPRIETARY FUND
Lease-Purchase - CresCom ($1M) 9/1/2022 4 of 7 145,282 8,100 153,382
Water Distribution 50% 72,641 4,050 76,691 76,691
72,641 4,050 76,691 76,691
2020 Bond Issue 12/1/2022 - 53,492 53,492 53,492
(2009A/B Refunding) 6/1/2023 1,022,000 53,492 1,075,492 1,075,492
Total - 2020 1,022,000 106,984 1,128,984 1,128,984
2018 Bond Issue 12/1/2022 - 296,494 296,494 296,494
W/S System Imprvs 6/1/2023 420,000 296,494 716,494 716,494
Total - 2018 420,000 592,988 1,012,988 1,012,988
2016 Bond Issue 12/1/2022 - 175,427 175,427 175,427
W/S System Imprvs 6/1/2023 685,000 175,427 860,427 860,427
Total - 2016 685,000 350,854 1,035,854 1,035,854
SRF 2005 Bond Issue 9/1/2022 96,243 8,448 104,691 82,920 7,279 90,199 194,890
JMWSC 53.718% 12/1/2022 96,784 7,907 104,690 83,386 6,812 90,199 194,889
3/1/2023 97,328 7,363 104,691 83,856 6,343 90,199 194,890
6/1/2023 97,876 6,815 104,690 84,327 5,871 90,199 194,889
388,231 30,532 418,763 334,489 26,306 360,795 779,558
Total:Proprietary Fund 388,231 30,532 418,763 2,534,130 1,081,182 3,615,312 4,034,075
JMW&SC
Total - 2005 SRF
CITY OF WEST COLUMBIA
DEBT SERVICE SCHEDULE
FISCAL YEAR 2022/2023
Payment Grand
Date Principal Interest Total Principal Interest Total Total
City of West Columbia
SPECIAL REVENUE FUND
HTAX Bond 2018 12/1/2022 5 of 10 - 31,360 31,360 31,360
6/1/2023 5 of 10 396,000 31,360 427,360 427,360
396,000 62,720 458,720 458,720
Total:Special Rev Fund 396,000 62,720 458,720 458,720
Total:All Funds 388,231 30,532 418,763 4,056,562 1,289,149 5,345,711 5,764,474
CITY OF WEST COLUMBIA
DEBT SERVICE SCHEDULE
FISCAL YEAR 2022/2023
Payment Grand
Date Principal Interest Total Principal Interest Total Total
City of West Columbia
Budget - Account Numbers
10-30-3001-093 925,000 136,440 1,061,440 1,061,440
10-41-4101-100 59,503 2,881 62,384 62,384
10-46-4601-100 16,279 738 17,017 17,017
10-51-5101-100 5,152 190 5,342 5,342
10-52-5201-100 112,771 4,712 117,483 117,483
10-54-5401-100 7,727 285 8,013 8,013
30-92-9201-100 72,641 4,050 76,691 76,691
30-94-9401-031 2,849,720 1,107,664 3,957,384 3,957,384
70-71-7100-100 396,000 62,720 458,720 458,720
Total:All Funds 4,444,793 1,319,681 5,764,474 5,764,474
S
E
C
T
I
O
N
4
RATE TABLES AND
FEE SCHEDULES
These following rates are used to calculate bills for water consumption and sewer usage. Most residential
customers are billed bi-monthly (every other month).
Inside City Limits Outside City Limits
Usage in Gallons Current Residential Current Residential
Up to 6,000 gallons $33.70 $67.40
(minimum billing) + $2.00 Surcharge
+ $10.00 Hydrant Fee
Uniform Rate 3.20 6.40
(per 1,000 gallons)
Inside City Limits Outside City Limits
Usage in Gallons Current Residential Current Residential
Up to 6,000 gallons $33.70 $67.40
(minimum billing)
Uniform Rate
(per 1,000 gallons) 3.10 6.20
City of West Columbia
Residential - Water and Sewer Service Bi-Monthly Rates
FY 2022 - 2023
Residential Water ONLY Service Rates
Residential Sewer ONLY Service Rates
These following rates are used to calculate bills for water consumption and sewer usage. Most residential
customers are billed bi-monthly (every other month).
Inside City Limits Outside City Limits
Usage in Gallons Current Residential Current Residential
Up to 6,000 gallons $25.50 $51.00
(minimum billing) + $2.00 Surcharge
+ $10.00 Hydrant Fee
Uniform Rate 3.20 6.40
(per 1,000 gallons)
Inside City Limits Outside City Limits
Usage in Gallons Current Residential Current Residential
Up to 6,000 gallons $25.50 $51.00
(minimum billing)
Uniform Rate 3.10 6.20
(per 1,000 gallons)
Inside City Limits Outside City Limits
Current Minimum Current Minimum
Up to 6,000 gallons $51.00 $102.00
(minimum billing) + $2.00 Surcharge
+ $10.00 Hydrant Fee
Uniform Rate 6.30 12.60
(per 1,000 gallons)
Combined Residential Water and Sewer Service Rates
City of West Columbia
Combined Residential - Water and Sewer Service Bi-Monthly Rates
FY 2022 - 2023
Combined Residential Water Service Rates
Combined Residential Sewer Service Rates
These following rates are used to calculate bills for water consumption and sewer usage. Most commercial
customers are billed bi-monthly (every other month).
Inside City Limits Outside City Limits
Base Charge Current Commercial Current Commercial
(no consumption)
3/4" Meter $17.00 $34.00
1" Meter $42.00 $84.00
1 1/2" Meter $85.00 $170.00
2" Meter $135.00 $270.00
3" Meter $270.00 $540.00
4" Meter $422.00 $844.00
6" Meter $843.00 $1,686.00
8" Meter $1,348.00 $2,696.00
+ $2.00 Surcharge
+ $10.00 Hydrant Fee
Uniform Rate 3.55 7.10
(per 1,000 gallons)
Inside City Limits Outside City Limits
Base Charge Current Commercial Current Commercial
(no consumption)
3/4" Meter $17.00 $34.00
1" Meter $42.00 $84.00
1 1/2" Meter $85.00 $170.00
2" Meter $135.00 $270.00
3" Meter $270.00 $540.00
4" Meter $422.00 $844.00
6" Meter $843.00 $1,686.00
8" Meter $1,348.00 $2,696.00
Uniform Rate 4.00 8.00
(per 1,000 gallons)
City of West Columbia
Commercial - Water and Sewer Service Bi-Monthly Rates
FY 2022 - 2023
Commercial Water Service Rates
Commercial Sewer Service Rates
These following rates are used to calculate bills for water consumption and sewer usage. Most commercial
customers are billed bi-monthly (every other month).
Inside City Limits Outside City Limits
Base Charge Current Commercial Current Commercial
(no consumption)
3/4" Meter $8.50 $17.00
1" Meter $21.00 $42.00
1 1/2" Meter $42.50 $85.00
2" Meter $67.50 $135.00
3" Meter $135.00 $270.00
4" Meter $211.00 $422.00
6" Meter $421.50 $843.00
8" Meter $674.00 $1,348.00
+ $1.00 Surcharge
+ $5.00 Hydrant Fee
Uniform Rate 3.55 7.10
(per 1,000 gallons)
Inside City Limits Outside City Limits
Base Charge Current Commercial Current Commercial
(no consumption)
3/4" Meter $8.50 $17.00
1" Meter $21.00 $42.00
1 1/2" Meter $42.50 $85.00
2" Meter $67.50 $135.00
3" Meter $135.00 $270.00
4" Meter $211.00 $422.00
6" Meter $421.50 $843.00
8" Meter $674.00 $1,348.00
Uniform Rate 4.00 8.00
(per 1,000 gallons)
City of West Columbia
Commercial - Water and Sewer Service Monthly Rates
FY 2022 - 2023
Commercial Water Service Rates
Commercial Sewer Service Rates
Tap Fees Inside City Limits Outside City Limits
3/4 - inch $400 $800
Residential only
Capacity Fees Inside City Limits Outside City Limits
3/4 - inch $600 $1,200
1 - inch $1,500 $3,000
1 1/2 - inch $3,000 $6,000
2 - inch compound $4,800 $9,600
3 - inch compound $9,600 $19,200
4 - inch compound $15,000 $30,000
6 - inch compound $30,000 $60,000
8 - inch compound $48,000 $96,000
Tap Fees Inside City Limits Outside City Limits
3/4 - inch $250 $500
Residential only
Capacity Fees Inside City Limits Outside City Limits
Residential $1,250 $2,500
Commercial $1,500 $3,000
Tap Fees Inside City Limits Outside City Limits
6 - inch line $4,000 $8,000
8 - inch line $8,000 $16,000
10 - inch line $12,000 $24,000
12 - inch line $16,000 $32,000
Fire Line Service Fees
City of West Columbia
All other tap sizes are at cost to be determined by the City.
Sewer Capacity Fees are measured per residential equivalency unit of 300 GPD
All service fees are subject to change based on use, demand and residential equivalency unit measurement.
(Meter Replacements should follow this same fee calculation.)
Water and Sewer Service Fees
FY 2022 - 2023
Water Service Fees
Sewer Service Fees
All other tap sizes are at cost to be determined by the City.
Late Fee 10% of bill, with a minimum of $5
After Hours Fee $45
Disconnect Fee $40
Locked Meter Fee $50
Pulled Meter Fee $60
Charge to Replace Cut Meter Lock $25
Miscellaneous Account Fees
Owner Renter Owner Renter
3/4" Residential Only 40.00$ 100.00$ 80.00$ 100.00$
Meter Size Inside Outside
3/4" 50.00$ 100.00$
1" 125.00$ 250.00$
1.5" 250.00$ 500.00$
2" 400.00$ 800.00$
3" (Compound) 800.00$ 1,600.00$
4" (Compound) 1,250.00$ 2,500.00$
6" (Compound) 2,500.00$ 5,000.00$
8" (Compound) 4,000.00$ 8,000.00$
Commercial Deposit Fees
Residential Deposit Fees
Residential Deposit Fees
Inside City Outside City
Commercial Deposit Fees
S
E
C
T
I
O
N
5
CAPITAL IMPROVEMENT
PROJECT LISTINGS
Information Technology (split)
--- PD - MDTs w/mounting (18) 85,000$
--- Replacement PCs 7,200
--- HP Rack Mounted Server Core 5,000
--- IP Camera Replacements for existing analog cameras 11,200
--- Incode 10 Upgrade Software 32,000
Police Department
--- Radio Replacements 48,000
--- CAT Team SUV Replacement 42,200
--- New SRO Vehicle 37,000
Sanitation
--- Purchase 400 each of household and recycling roll carts 60,000
--- New One-Arm Bandit Truck 322,000
--- Purchase (2) two roll-off containers 15,000
--- Replace (810) w/ new f650 Switch-and-Go 75,000
Parks
--- Replace (1025) SCAG 2014 11,000
--- New F550 Flat Bed Truck 75,000
--- Replace (704) F150 Truck 30,000
Maintenance Shop (split)
--- RAM 1500 Quad Cab Truck 20,000
--- Replace Shop Welder 2,800
--- New A/C Machine 3,300
--- Crane for Shop Truck 10,500
--- Large Bay for large trucks 300,000
FY 2022-2023 (Year 1) Totals 1,192,200$
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
FY 2022-2023 Budget Year - Year 1
Page 1 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600$
--- HP Switch Upgrade - City Hall/PD 6,100
--- IP Camera Replacements for existing analog cameras 11,200
Police Department
--- 4 Patrol Vehicles 212,000
--- 1 Investigations Vehicles 40,000
--- 10 Radio Replacements 48,000
--- 8 SORT Team Vest Replacements 15,000
Fire Department
--- 100' Tractor Drawn Aerial Truck (replace Tower 2 - 2006) w/ equipment 1,860,000
--- Renovation of bathroom/shower and front restrooms 50,000
--- Training Facility with concrete foundation (Connex boxes) 150,000
--- Pickup replace Marshal 2 (2012) with equipment 55,000
--- Class A Pumper replace Engine 5 (1995) with new pumper and equipment 800,000
--- Side by Side UTV with stokes basket for rescue and medical at events 40,000
Streets
--- Upgrades to the Public Works facility – Sheds, Asphalt, & Drainage 280,000
Sanitation
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace (1024) w/ new Kubota 20,000
--- Replace (1037) w/ new SCAG 12,000
Maintenance Shop (split)
--- Replace Vehicle (5301-905) 2009 Ford F350 (Service Truck) 45,000
--- Replace Roll-up Bay Doors 20,000
FY 2023-2024 (Year 2) Totals 3,714,900$
FY 2023-2024 Budget Year - Year 2
Page 2 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600$
--- Sonicwall Firewall - City Hall 2,800
--- IP Camera Replacements for existing analog cameras 11,200
Police Department
--- 4 Patrol Vehicles 212,000
--- 1 Investigations Vehicles 40,000
--- 10 Radio Replacements 48,000
--- Narcotics Surveillance Equipment 9,000
Fire Department
--- New Station 2 Construction located on property at Leaphart Rd 6,000,000
--- New Class A Fire Engine with equipment for Station 2 825,000
--- SUV replace Marshal 1 (2014) with equipment 55,000
Sanitation
--- Sell and Replace (813) w/ a new 25 yard packer 195,000
--- Sell and Replace (719) w/ one Knuckle boom 285,000
--- Sell and Replace (716) Flatbed w/ a new Flatbed 80,000
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace (1038) w/ new SCAG 12,000
--- Replace (1034) w/ new F-450 Switch and Go w/ Landscape body 65,000
--- Replace (1033) w/ new F-250 Crew Cab 40,000
--- Replace (1026) w/ new F-250 w/ utility boxes 40,000
Maintenance Shop (split)
--- Replace metal siding and insulation on Maint Shop building 25,000
--- Replace Vehicle (5301-912) 2007 Chevrolet 2500 20,000
FY 2024-2025 (Year 3) Totals 8,015,600$
FY 2024-2025 Budget Year - Year 3
Page 3 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600$
--- Citywide InDesign - Website upgrade 4,000
--- Upgrade backup appliance at City Hall 21,000
--- IP Camera Replacements for existing analog cameras 11,200
Police Department
--- 4 Patrol Vehicles 212,000
--- 1 Investigations Vehicles 40,000
--- 10 Radio Replacements 48,000
--- Speed Trailer 9,000
Sanitation
--- Sell and Replace (818) pull behind leaf machine 50,000
--- Sell and Replace (817) w/ a new 8 yard packer 150,000
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace (1020) Kubota for Riverwalk 20,000
--- Replace (1002) w/ a new F-550 Switch and Go 70,000
Maintenance Shop (split)
--- Replace Lift for Heavy Duty Trucks 50,000
--- Replace Vehicle (5301-811) 2013 Ford F150 20,000
FY 2025-2026 (Year 4) Totals 755,800$
FY 2025-2026 Budget Year - Year 4
Page 4 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600$
--- IP Camera Replacements for existing analog cameras 11,200
Police Department
--- 4 Patrol Vehicles 212,000
--- 1 Investigations Vehicles 40,000
Fire Department
--- Class A Pumper replace Engine 4 (2000) with new pumper and equipment 850,000
--- SUV replace Fire 2 (2017) with equipment 60,000
Sanitation
--- Sell and Replace (805) w/ a new 30 yard packer 200,000
--- Sell and Replace (703) w/ a new F-250 crew cab 40,000
--- Sell and Replace (801) w/ a new F-250 Scout 40,000
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace (1029) w/ New F350 Dump Truck 45,000
--- Replace (1027) w/ New F250 Utility Truck 40,000
--- Replace (1005) w/ New F250 35,000
--- Replace (1006) w/ New F250 35,000
Maintenance Shop (split)
--- Replace Vehicle Lifts 17,500
FY 2026-2027 (Year 5) Totals 1,676,300$
FY 2026-2027 Budget Year - Year 5
Page 5 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600$
--- IP Camera Replacements for existing analog cameras 11,200
Police Department
--- 4 Patrol Vehicles 212,000
--- 1 Investigations Vehicles 40,000
Fire Department
--- SUV replace Battalion (2018) with equipment 60,000
Sanitation
--- Sell and Replace (803) w/ a new 25 yard packer 195,000
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace (1044) w/ a new CAT Skid Steer 75,000
Maintenance Shop (split)
--- Replace Shop Air Compressor 12,500
FY 2027-2028 (Year 6) Totals 656,300$
FY 2027-2028 Budget Year - Year 6
Page 6 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600$
--- Sonicwall Firewall - City Hall 2,800
--- IP Camera Replacements for existing analog cameras 11,200
Police Department
--- 4 Patrol Vehicles 212,000
--- 1 Investigations Vehicles 40,000
--- 1 Polaris ATV 18,000
--- Dispatch equipment upgrade and possible software upgrade 175,000
Fire Department
--- SUV replace Fire 1 (2019) with equipment 60,000
Sanitation
--- Sell and Replace (816) w/ a new CAT Tink Claw loader 150,000
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace bucket truck purchased in 2019-20 130,000
--- Replace SCAG purchased in 2019-20 12,000
Maintenance Shop (split)
--- Replace HVAC Systems 22,500
FY 2028-2029 (Year 7) Totals 884,100$
FY 2028-2029 Budget Year - Year 7
Page 7 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- HP Rack Mounted Server Core 3,000$
--- Replacement PCs for PCs over 5 years old 4,600
--- IP Camera Replacements for existing analog cameras 11,200
Police Department
--- 4 Patrol Vehicles 212,000
--- 1 Investigations Vehicles 40,000
--- 8 SORT Team Vests 15,000
Sanitation
--- Sell and Replace (804) one arm bandit w/ new 280,000
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace SCAGs purchased in 2021 and 2022 24,000
--- Replace F550 Switch and Go purchased in 2021-22 80,000
Maintenance Shop (split)
--- Replace roof on Maintenance Building 20,000
FY 2029-2030 (Year 8) Totals 735,800$
FY 2029-2030 Budget Year - Year 8
Page 8 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600$
Police Department
--- 4 Patrol Vehicles 212,000
--- 1 Investigations Vehicles 40,000
Sanitation
--- Sell and Replace CAT Tink Claw loader purchased in 2019-20 150,000
--- Sell and Replace F-550 Switch and Go purchased in 2019-20 65,000
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace F150 purchased in 2022-23 30,000
--- Replace Landscape switch and go purchased in 2020-21 70,000
Maintenance Shop (split)
--- New Tire Machine and Balancer 15,000
FY 2030-2031 (Year 9) Totals 632,600$
FY 2030-2031 Budget Year - Year 9
Page 9 of 10
City of West Columbia
General Fund
New 10 - YEAR CIP - Updated 05.15.2022
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600$
Police Department
--- 5 Patrol Vehicles 265,000
--- 1 Investigations Vehicles 40,000
Sanitation
--- Sell and Replace 30 yard packer purchased in 2022-23 220,000
--- Sell and Replace Scout from 2020-21 purchase 30,000
--- Purchase 300 each of household and recycling roll carts 46,000
Parks
--- Replace Sweeper puchased in 2022-23 315,000
--- Replace SCAG purchased in 2022-23 15,000
Maintenance Shop (split)
--- Replace Brake Lathe 3,800
FY 2031-2032 (Year 10) Totals 939,400$
Projected Totals for next 10 years of CIP. 19,203,000$
FY 2031-2032 Budget Year - Year 10
Page 10 of 10
Plant 2
--- Improvements to the Lake Murray Water Treatment Plant (Engineering) 3,200,000$
--- High Service No. 1 VFD Conversion 85,000
Plant 1
--- Rehabilitate Filter No. 6 295,000
--- SCADA Server Upgrades 12,000
--- Bulk Alum Storage 50,000
Water
--- Saluda Gardens Water System Improvements - Division II (Construction) 2,550,000
--- Westover Acres Water System Improvements (Design & Permitting) 120,000
--- Replace VaCON 525,000
Sewer
--- Wastewater Collection System Assessment 55,000
Other Water/Sewer Replacement/Refurbishment Projects 500,000
Information Technology (split)
--- Sonicwall TZ270 Firewalls 4,500
--- Replacement PCs 7,200
--- HP Rack Mounted Server Core 5,000
--- IP Camera Replacements for existing analog cameras 11,200
--- Incode 10 Upgrade Software 32,000
Maintenance Shop (split)
--- RAM 1500 Quad Cab Truck 20,000
--- Replace Shop Welder 2,800
--- New A/C Machine 3,300
--- Crane for Shop Truck 10,500
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects 1,700,000
--- Metro Waste Water Treatment Plant projects 300,000
FY 2022-2023 (Year 1) Totals 9,488,500$
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
FY 2022-2023 Budget Year - Year 1
Page 1 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 2
--- Improvements to the Lake Murray Water Treatment Plant (Construction) 50,100,000$
Water
--- Mill Village Water System Improvements (Design & Permitting) 145,000
--- Westover Acres Water System Improvements (Construction) 850,000
--- Replace Dump Truck 163,200
--- Small Mini-Excavator 50,000
Sewer
--- 2021 Collection System Improvements (Construction) 450,000
--- Jackson Street Sewer Main Rehabilitation. 185,000
--- Inflow and Infiltration Study 40,000
--- Replace Chevy 1500 44,600
Other Water/Sewer Replacement/Refurbishment Projects 500,000
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600
--- HP Switch Upgrade - City Hall/PD 6,100
--- IP Camera Replacements for existing analog cameras 11,200
Maintenance Shop (split)
--- Replace Vehicle (5301-905) 2009 Ford F350 (Service Truck) 45,000
--- Replace Roll-up Bay Doors 20,000
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2023-2024 (Year 2) Totals 52,614,700$
FY 2023-2024 Budget Year - Year 2
Page 2 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 1
--- Powder Activated Carbon Improvements 1,200,000$
--- Caustic Feed System 1,000,000
Water
--- Mill Village Water System Improvements (Construction) 4,400,000
--- Augusta Street Water Main Replacement 750,000
Sewer
--- Augusta Street Sewer Main Rehabilitation (Design) 150,000
--- Center Street Wastewater Improvements (Design & Construction) 450,000
--- Klapman Blvd. Sewer Main Rehabilitation. 450,000
Other Water/Sewer Replacement/Refurbishment Projects 750,000
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600
--- Sonicwall Firewall - City Hall 2,800
--- IP Camera Replacements for existing analog cameras 11,200
Maintenance Shop (split)
--- Replace metal siding and insulation on Maint Shop building 25,000
--- Replace Vehicle (5301-912) 2007 Chevrolet 2500 20,000
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2024-2025 (Year 3) Totals 9,213,600$
FY 2024-2025 Budget Year - Year 3
Page 3 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 1
--- PLC & Control Equipment Evaluation 20,000$
--- Embankment Stabilization Project (Design & Construction) 1,750,000
Sewer
--- Augusta Street Sewer Main Rehabilitation (Construction) 1,400,000
--- Replacement of 4" Trailer Mounted Bypass Pump & Hose 75,000
--- 2025 Collection System Improvements 425,000
Other Water/Sewer Replacement/Refurbishment Projects 750,000
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600
--- Citywide InDesign - Website upgrade 4,000
--- Upgrade backup appliance at City Hall 21,000
--- IP Camera Replacements for existing analog cameras 11,200
Maintenance Shop (split)
--- Replace Lift for Heavy Duty Trucks 50,000
--- Replace Vehicle (5301-811) 2013 Ford F150 20,000
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2025-2026 (Year 4) Totals 4,530,800$
FY 2025-2026 Budget Year - Year 4
Page 4 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 2
--- Upgrade Solids Handling Equipment 550,000$
Plant 1
--- Embankment Stabilization Project (Design) 75,000
--- Replace Phosphate system 75,000
Sewer
--- Charleston Highway Sewer Main Rehabilitation (Construction) 450,000
--- Sewanee and Redwood Drive Sewer Main Rehabilitation (Construction) 250,000
--- Update Wastewater Master Plan 55,000
--- Replace Chevy 3500 80,040
Other Water/Sewer Replacement/Refurbishment Projects 500,000
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600
--- Sonicwall Firewall 5,600
--- IP Camera Replacements for existing analog cameras 11,200
Maintenance Shop (split)
--- Replace Vehicle Lifts 17,500
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2026-2027 (Year 5) Totals 2,073,940$
FY 2026-2027 Budget Year - Year 5
Page 5 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 2
--- Chemical Feed Improvements 750,000$
Plant 1
--- Replace Filter Media & Underdrains (Filters No. 1 - 4) 1,400,000
--- Embankment Stabilization Project (Construction) 2,000,000
Sewer
--- Replace 6" Bypass Pump & Hose 89,600
--- Replace Chevy 3500 82,500
Other Water/Sewer Replacement/Refurbishment Projects 500,000
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600
--- IP Camera Replacements for existing analog cameras 11,200
Maintenance Shop (split)
--- Replace Shop Air Compressor 12,500
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2027-2028 (Year 6) Totals 4,850,400$
FY 2027-2028 Budget Year - Year 6
Page 6 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 2
--- Replace Chevy 1500 48,000$
Plant 1
--- Upgrade Onsite Generation Disinfection Equipment 650,000
Water
--- Replace Chevy 1500 48,200
--- Repalce Chevy 3500 84,000
Update Distribution & Collection Condition Assessment 105,000
Other Water/Sewer Replacement/Refurbishment Projects 500,000
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600
--- Sonicwall Firewall - City Hall 2,800
--- IP Camera Replacements for existing analog cameras 11,200
Maintenance Shop (split)
--- Replace HVAC Systems 22,500
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2028-2029 (Year 7) Totals 1,476,300$
FY 2028-2029 Budget Year - Year 7
Page 7 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 1
--- Replace Chevy Equinox 38,000$
Water
--- Fire Hydrant Replacement 140,000
--- Replace Chevy 1500 48,200
--- Repalce Chevy 3500 84,000
Other Water/Sewer Replacement/Refurbishment Projects 750,000
Information Technology (split)
--- HP Rack Mounted Server Core 3,000
--- Replacement PCs for PCs over 5 years old 4,600
--- IP Camera Replacements for existing analog cameras 11,200
Maintenance Shop (split)
--- Replace roof on Maintenance Building 20,000
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2029-2030 (Year 8) Totals 1,099,000$
FY 2029-2030 Budget Year - Year 8
Page 8 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 2
--- Replace Disinfection Bulk Storage Tanks 150,000$
Plant 1
--- Replace Raw Water Pumps 130,000
Water
--- Storage Tank Coating Mainteance 150,000
Other Water/Sewer Replacement/Refurbishment Projects 750,000
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600
Maintenance Shop (split)
--- New Tire Machine and Balancer 15,000
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2030-2031 (Year 9) Totals 1,199,600$
FY 2030-2031 Budget Year - Year 9
Page 9 of 10
City of West Columbia
Water and Sewer Fund
New 10 - Year CIP - Updated 05.15.2022
Plant 2
--- Update Facility Master Plan 250,000$
Plant 1
--- Upgrade PLCs Throughout 375,000
Water
--- Replace F250 84,000
Other Water/Sewer Replacement/Refurbishment Projects 750,000
Information Technology (split)
--- Replacement PCs for PCs over 5 years old 4,600
Maintenance Shop (split)
--- Replace Brake Lathe 3,800
City Of Columbia WWTP Capital Projects - CWC Share
--- Sewer line projects -
--- Metro Waste Water Treatment Plant projects -
FY 2031-2032 (Year 10) Totals 1,467,400$
Projected Totals for next 10 years of CIP. 88,014,240$
FY 2031-2032 Budget Year - Year 10
Page 10 of 10
S
E
C
T
I
O
N
6
STATE HEALTH CARE
PREMIUMS DETAIL
Employee City
Type of Coverage Health Dental Life LTD Total Part Part
Employee 500.38$ 13.48$ 0.32$ 3.22$ 517.40$ -$ 517.40$
Employee/spouse 1,051.04 21.12 0.32 3.22 1,075.70 155.68 920.02
Employee/children 761.92 27.20 0.32 3.22 792.66 46.18 746.48
Full Family 1,305.28 34.82 0.32 3.22 1,343.64 208.88 1,134.76
Employee City
Type of Coverage Health Dental Life LTD Total Part Part
Employee 682.19$ 13.48$ 0.32$ 3.22$ 699.21$ -$ 699.21$
Employee/spouse 1,422.55 21.12 0.32 3.22 1,447.21 185.26 1,261.95
Employee/children 1,039.81 27.20 0.32 3.22 1,070.55 54.95 1,015.59
Full Family 1,768.40 34.82 0.32 3.22 1,806.76 248.57 1,558.19
State Premiums & Costs - January 1, 2023 to June 30, 2023 (Projected)
Total Premiums
City of West Columbia
Insurance Information
State Health Plan Monthly Premiums & Costs
(Estimated)
State Premiums & Costs - July 1, 2022 to December 31, 2022 (Actual)
Total Premiums
Source: City of West Columbia website. First collected Oct 14, 2026.