RecordWell Data

Backup Material

Oconee County · Oconee County · meeting of Aug 18, 2026 · Other

Open the original document More from Oconee County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

- CODE OF ORDINANCES Chapter 26 ROADS AND BRIDGES Oconee County, South Carolina, Code of Ordinances Created: 2026-05-07 10:21:27 [EST] (Supp. No. 55) Page 1 of 33 Chapter 26 ROADS AND BRIDGES1 ARTICLE I. IN GENERAL2 DIVISION 1. UNIFIED ROAD STANDARDS FOR THE UNINCORPORATED AREAS OF OCONEE COUNTY Sec. 26-1. General provisions. These general provisions shall apply to both private roads and drives and public roads. The definitions section of the land development and subdivision chapter of the Oconee County Unified Performance Standards Ordinance (Ordinance 2008-20, [as codified in chapter 32, article VI, §§ 32-211—32-226]) shall apply to this article. (1) Survey standards. Route surveys and plats shall be prepared and survey data entered thereon in accordance with the most recently adopted version of the "Minimum Standards Manual of the Practice of Surveying in South Carolina" established by the South Carolina Board of Registration for Professional Engineers and Land Surveyors, provided that all elevations information shall refer to Mean Sea Level Datum or other established datum (with a minimum of two benchmarks). Accuracy of plats and attendant data shall be no less that than required in said manual for Class B Suburban Land Surveys. (2) Utilities. When utilizing a road right-of-way, all utility lines shall be buried at a depth of at least 36 inches. Such lines shall be located a minimum of two feet, outside the portion of the road to be surfaced to prevent having to cut into the paved surface or reconstruct drainage structures to serve abutting properties. In order to prevent future road cuts, utility stub- outs shall be added to all utility lines extending beyond the roadway to each property line. (3) Road signs. Road name signs shall be installed at all intersections within a subdivision. All other signs shall be installed as required by and at the direction of the county engineer or his/her designee. All signage will be in accordance with the manual of uniform traffic control devices. The developer shall be responsible for all cost of road signage for private drives, private roads, and proposed county roads (at a cost determined by resolution of county council from time to time) prior to acceptance of road by the 1Cross reference(s)—Buildings and building regulations, ch. 6; environment, ch. 12; floods, ch. 16; planning and development, ch. 24; utilities, ch. 34. State law reference(s)—County roads, bridges and ferries generally, S.C. Code 1976, § 57-17-10 et seq. 2Editor's note(s)—Ord. No. 2008-19, adopted Dec. 16, 2008 repealed Art. I, §§ 26-1—26-9, in its entirety. Articles 1—9 enacted new provisions to read as herein set out. Prior to amendment, Art. I pertained to similar subject matter and derived from Ord. No. 1975, §§ 1—4, adopted Feb. 20, 1975; Ord. No. [19]82-14, §§ II— IV, adopted Dec. 21, 1982; Ord. No. [19]83[0]3, §§ A—F, May 3, 1983; Ord. No. [19]83-[0]7, §§ 1—3, adopted Aug. 16, 1983; Ord. No. [19]91-[0]9, §§ I, II, IV—VIII, adopted Sep. 17, 1991; Ord. No. 99-22A, § I, adopted Aug. 17, 1999; Ord. No. 2001-18, adopted May 1, 2001; Ord. No. 2006-11, §§ 1—5(1), 5(2), adopted May 1, 2006; Ord. No. 2007-09, adopted Sep. 18, 2007 and Ord. No. 2008-11, adopted Aug. 5, 2008. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 2 of 33 county. Any person who shall willfully or maliciously damage, deface, remove or otherwise tamper with a sign erected by a subdivider or the county designating the name of any county road shall be guilty of a misdemeanor and punished in accordance with this article. In addition thereto, such person shall be liable to the county for the cost incurred by the county as a result of said criminal acts. (4) Submission of road plans. Construction plans for roads shall include accurate topographic information with increments of no more than five feet. In addition, all such plans should note the following items: the location and dimensions of all drainage features; routes of surface wat er drainage for the entire development; a typical cross section of the proposed roadway; road profiles; horizontal and vertical curve designs; right-of-way dimensions; the location of all cuts and fills; finished grade elevation; all necessary erosion control practices, which may include but are not limited to, permanent vegetation, lined or piped ditches or vegetated waterways; and contact information of all interested parties. (5) Road alignment and location. The direction and pattern of roads shall take advantage of the land contour to eliminate or reduce excessive cutting and filling, and provide roads with reasonable grades. (Ord. No. 2008-19, Art. 1(1—5), 12-16-2008) Sec. 26-2. Private road standards and regulations. Oconee County shall have no responsibility for nor control of the design, engineering, construction, inspection or maintenance of private driveways, drives and roads in Oconee County and shall only be involved with private driveways, drives and roads to enforce these regulations and to the extent required for the county to carry out its other duties and functions, such as approving the subdivision of property. (a) Private driveways. Private driveways shall serve no more than three residential dwellings, and shall be maintained by the property owner(s). No design standards shall apply to private driveways, but driveways must comply with applicable building and fire codes. (b) Private drives. All private drives existing and in use at the time of adoption of these regulations, as well as those private drives under construction prior to the time of adoption, shall be exempted from the standards contained in this section. This exemption shall also extend to those private drives approved by the planning department prior to the time of adoption. All other private drives shall: (1) Serve no more than ten lots or dwellings; (2) Have a minimum road right-of-way of 50 feet, or an appropriately executed private roadway easement as defined by these regulations; (3) Have an appropriate encroachment permit from either the county or the South Carolina Department of Transportation; (4) Have a minimum driving surface width of 20 feet constructed of no less than five inches of compacted crushed stone or gravel base; a minimum height clearance of 13½ feet; and appropriate documentation from a professional engineer licensed by the State of South Carolina certifying the maximum weight limit of any bridge or culvert located along the drive. All bridges and any culvert over which a private drive crosses a perennial stream must include appropriate signage (located at each end of the bridge) displaying the structure's weight limits; (5) Be maintained by an individual, association of property owners, or commonly held by the property owners fronting the private drive; (6) Comply with all current fire regulations and codes; Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 3 of 33 (7) Shall serve no more than ten dwellings, and shall connect to another road, either public or private, on one end only. In the event proposed construction and/or development will res ult in an existing private drive serving 11 or more dwellings, the existing drive shall be upgraded so as to meet the standards put forth in these regulations for private roads; (8) Parcel boundaries may extend to centerline of the road, with the appropriate road right -of-way shown on all plats and deeds; (9) Be named in accordance with adopted E-911 addressing regulations and procedures; (10) Allow at least 100 feet of sight distance for each ten miles per hour of the posted speed limit where the private drive intersects a public road. The sight distance shall be measured from a seeing height of 3½ [feet], offset 15 feet from edge of road, to an object 4¼ feet in height above the gr ade of the public road, as stated in SCDOT's 1996 Access and Roadside Management Manual. If the proposed drive does not meet the sight distance requirement, a waiver must by signed by the individual(s) constructing the private drive stating that the property owner(s) is liable and responsible for any accidents, injuries, problems, and property damage resulting from improper sight distance; (11) Meet all applicable stormwater management and sediment control regulations; (12) Be approved in writing by planning commission or designated staff prior to submission of plat(s) to the register of deeds for recording. The following shall be prominently printed on the plat(s): "THE ROAD RIGHT-OF-WAY SHOWN ON THIS PLAT SHALL BE PRIVATE DRIVES NOT OWNED, MAINTAINED OR SUPERVISED BY OCONEE COUNTY, AND WERE NOT CONSTRUCTED PURSUANT TO ANY PLAN FOR FUTURE ACCEPTANCE BY OCONEE COUNTY. ROAD RIGHT-OF-WAYS SHOWN UPON THE PLAT SHALL NOT BE ACCEPTED FOR MAINTENANCE BY OCONEE COUNTY AT ANY TIME IN THE FUTURE UNLESS CONSTRUCTED IN ACCORDANCE WITH ALL ADOPTED OCONEE COUNTY REGULATIONS. MAINTENANCE OF THE RIGHT-OF-WAY SHALL BE THE RESPONSIBILITY OF _______." (13) Signage shall comply with the manual for uniform traffic control devices. (c) Private roads. Private roads shall provide vehicular access and road frontage to developments, or sections of developments, containing more than ten dwellings. All private, nondedicated roads shall be prominently indicated as such on plats prior to subdivision approval. Maintenance arrangements for such roads must be noted in writing on subdivision plat submittals and must be subsequently recorded. The development served by a private road shall have direct access into a public road, and no such private road shall be laid out so as to serve property outside the development. All private roads shall: (1) Serve a minimum of 11 lots; (2) Have a minimum road right-of-way width of 50 feet; (3) Be designed in accordance with the regulations set forth in subsections 26 -3(e) and (r) of these regulations; (4) Be constructed in accordance with the regulations set forth in subsections 26 -3(f) and (r) of these regulations; (5) Be maintained by an association of property owners or the developer and be designated on all plats and recorded in appropriate deed covenants and restrictions, or an appropriately executed private roadway easement as defined by these regulations; (6) Parcel boundaries may extend to the centerline of the road, with the appropriate right -of-way designated on all plats and deeds; (7) Be legally certified for compliance by a surveyor/engineer licensed by the State of South Carolina; Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 4 of 33 (8) Be named in accordance with adopted E-911 addressing regulations; (9) Meet all stormwater management and sediment control regulations; (10) Be properly approved in writing by planning director prior to submission of plat(s) to the register of deeds for recording. The following shall be prominently printed on the plat(s): "THE ROAD RIGHT-OF-WAY SHOWN ON THIS PLAT SHALL BE PRIVATE ROADS, NOT OWNED, MAINTAINED OR SUPERVISED BY OCONEE COUNTY AND NOT CONSTRUCTED PURSUANT TO ANY PLAN FOR FUTURE ACCEPTANCE BY OCONEE COUNTY. ROAD RIGHT-OF-WAY SHOWN UPON THE PLAT SHALL NOT BE ACCEPTED FOR MAINTENANCE BY OCONEE COUNTY AT ANY TIME IN THE FUTURE UNLESS CONSTRUCTED IN ACCORDANCE WITH ALL OCONEE COUNTY REGULATIONS. MAINTENANCE OF THE RIGHT-OF-WAY SHALL BE THE RESPONSIBILITY OF THE _______." (11) Have installed signs that control the traffic flow in a safe manner as specified by standards in the Manual for Uniform Traffic Control Devices. With the exception of the requirements put forth in this section, all private roads shall meet the requirements for all public roads as defined by this article. (Ord. No. 2008-19, Art. 2(1—3), 12-16-2008; Ord. No. 2013-16, § 2A, 7-16-2013; Ord. No. 2022-23, § C, 10-18- 2022) Sec. 26-3. Public roads. (a) Continuation of adjoining road system. The proposed road layout shall extend existing roads on a logical course at a width which meets the minimum required by this article. A minimum 100:1 taper section shall be used to transition from one width to another. (b) Road system coordination. The road system within a subdivision shall be coordinated with existing, proposed, and anticipated roads (hereinafter "surrounding roads") outside the subdivision, as determined by the county or the State of South Carolina. Subdivision roads shall intersect wit h surrounding roads at safe and convenient locations and where necessary to permit the efficient movement of traffic between residential neighborhoods by emergency service vehicles. Subdivision roads shall only enter arterial roads when absolutely necessary. Whenever connections to surrounding roads are required by this section, the road right-of-way shall be extended and the street developed to the property line of the subdivided property (or to the edge of the remaining undeveloped portion of a single tra ct) at the point where the connection to the anticipated or proposed street is expected. In addition, the permit-issuing authority may require temporary turnarounds to be constructed at the end of such streets pending their extension when such turnarounds appear necessary to facilitate the flow of traffic or accommodate emergency vehicles. All temporary dead-end streets must be approved by the planning director and the county engineer. (c) Road names. A proposed road which is obviously in alignment with or an extension of an existing named road shall bear the name of the existing road. Except for the above, in no case shall the name of a proposed road duplicate or be phonetically similar to an existing road name, irrespective of the use of suffix (road, avenue, boulevard, drive, place, court, lane, etc.). It shall be unlawful for any person in laying out any new road to name such road on any final plat or instrument, without first obtaining the approval of the Oconee E - 911 Addressing Office. (d) Residential buffers for collector or arterial roads. Where a subdivision abuts or contains an existing or proposed collector or arterial road; lots which abut or are adjacent to these existing or proposed collector or arterial roads shall face a local road. Other treatment may also be required, as necessary, for adequate protection of the landscape and residential properties and for separation of through and local traffic. Special Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 5 of 33 treatment may be required, such as screen planting contained in a nonaccess reservation along the rear property line adjacent to the arterial road. (e) Road design (geometric criteria). In general, geometric criteria for road design shall be in accordance with standards of the South Carolina Department of Transportation (SCDOT). Said standar ds are those contained in the latest edition of "A Policy on Geometric Design of Highways and Streets" by the American Association of State Highway and Transportation Officials. Local and collector residential roads (public) shall be designed in accordance with the following standards. (1) Minimum right-of-way, pavement, and shoulder width shall be as follows: Road Type Right-of-Way Pavement Shoulder Arterial1 66′ or greater 28′ 10′ Collector 50′ 24′ 8′ Major local 50′ 22′ 6′ Minor local 50′ 20′ 4′ 1 As determined by county engineer For high density residential or nonresidential subdivisions or portions thereof, additional right -of-way or pavement width shall be provided when determined as necessary by the planning commission or county engineer. (2) Cul-de-sacs shall comply with current fire regulations and codes. Dead-end streets without turnarounds are prohibited. All unpaved islands located within perimeters of a cul -de-sac shall be round in configuration, centered within the right-of-way, curbed and properly drained. The area utilized by any unpaved island shall not be considered part of the minimum area needed to meet the required dimensions for the cul-de-sac or right-of-way and shall be governed by the same standards for planted median islands, as set forth in this article. (3) Horizontal curvature shall be introduced at any change in road direction, and the minimum centerline radius shall be 150 feet for local roads and 250 feet for collector roads. Arterial road curvature shall be in accordance with state highway department standards. Minimum tangent between reverse curves shall be 150 feet for local roads, and 100 feet from curve to any intersecting road right -of-way. (4) Stopping distance on vertical curves, horizontal curves, or normal intersections shall allow at least 100 feet of sight distance for each ten miles per hour of the posted speed limit where the road intersects another public road. a. The sight distance shall be measured from a seeing height of 3½ feet, offset 15 feet from edge of road, to an object 4¼ feet in height above the grade of the public road, as stated in SCDOT's 1996 Access and Roadside Management manual. See drawing. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 6 of 33 b. Minimum sight distance at intersections shall provide a clear sight triangle. The right -of-way shall be clear of obstacles to enable the minimum sight distance required, as determined by the speed limit of the road being accessed increases. The necessary right-of-way in either direction shall be entered upon the final plat prior to recording. Modifications may be required by the co unty engineer in order to insure safety. (5) Roads shall be designed to intersect as nearly as possible at right angles. In no case shall the angle of intersection be less than 75 degrees. Minimum radius of curb or pavement edge at intersections shall be at least 20 feet at intersections with local roads and 25 feet at intersections with collector roads. (6) Road grades shall be no less than 0.5 percent and no greater than 12 percent. The following shall apply: Road Classification Maximum Grade Arterial Roads 4 percent Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 7 of 33 Collector Roads 6 percent Local 12 percent (7) Proposed intersections on one side of a road shall coincide with existing or proposed intersections on the opposite side. Minimum centerline offset for intersections on the opposite side of a road shall be 150 feet. No two roads may intersect on the same side of a road at a centerline separation distance of less than 400 feet. (8) Intersections shall be designed with a flat grade whenever practical. When approaching an intersection in hilly or rolling areas, a leveling area shall be provided having not greater than a five percent grade at a distance of 30 feet, measured from the nearest right-of-way line of the intersecting street. (9) If the developer proposes a planted median island, the road right -of-way shall be divided in half for each half of the road (25 feet each side) with each lane centered in the right -of-way. A perpetual maintenance plan shall be submitted to the county prior to construction of said planted median island. the county shall not be responsible for maintaining any median vegetation. Vegetati on within the right- of-way may be removed by the county if it presents a safety or visual hazard. All planted medians shall be drained and maintained by methods submitted by the developer and approved by the county engineer. (10) All driveway locations must be approved by the county engineer. (f) Road construction. In general, all public roads shall be constructed in accordance with the SCDOT "Standard Specifications for Highway Construction" (latest edition) as it related to earthwork, bases/subbases, pa ved surfaces, etc. The following requirements shall also apply: (1) Paved road surfaces are required for all new roads. The county engineer may wave the strict application of aggregate requirements for hot mixed asphalt pavement with materials prepared wi th stone from the county rock quarry. (2) The minimum base course for all roads shall consist of type #1 (550 lbs. per square yard) crushed gravel aggregates compacted on the roadway to a depth of not less than five inches. Compaction of the aggregate shall comply with the standards set forth in this article. (3) Local roads. When hot asphaltic mix will be applied, specifications for set up are same as for the surface treatment. Asphalt shall be applied at no less than two-inch compacted of type as specified by the county engineer. (4) Collector roads. Road base shall include 550 lbs. of stone per square yard (approx. 5) with two -inch surface course of asphaltic concrete. (5) Industrial/commercial roads. Road base shall include 650 lbs. of stone per square yard (approx. 6) with two-inch surface course of asphaltic concrete. (6) Road paving is required for all new nonresidential subdivisions falling under the jurisdiction of this article. Pavement design requirements for a nonresidential subdivision shall be in accordance with sound engineering principles as outlined in procedures adopted by the American Association of State Highway and Transportation Officials; or the Portland Cement Institute; or the Nat ional Asphalt Institute. All designs shall be subject to review and approval of the county engineer and the county planning commission. However, in no case shall the paving standard be less than the standard required for a new residential subdivision. (7) The entire right-of-way area shall be cleared of all stumps, roots, brush, and other objectionable materials prior to grading roads. All tree stumps and other vegetation shall be removed to a depth of Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 8 of 33 two feet below the sub-grade. Rock, when encountered, shall be scarified to a minimum depth of three inches below sub-grade. The entire right-of-way shall be graded. (8) All debris and other material deemed unsuitable by the county engineer shall be removed before any dirt or soil is placed in fills for the subgrade. Unsuitable materials include any organic matter, unstable soil, trash, large stones, or other items that prevent the soil from being properly compacted. (9) All fill lifts shall be formed by placing and spreading the material in successive, unif orm, horizontal layers of not more than six inches in depth for the full width of the cross section and shall be kept level by the use of approved equipment. Prior to each subsequent layer the compacted layer shall be scarified before placing fill. The county engineer or his designated representative may call for compaction tests at the completion of any of the six-inch lifts being made. Each level will be compacted to a 95 percent proctor. (10) Suitable material shall be placed in the embankment for the formation, compaction, and shaping of all embankments, subgrades, shoulders, slopes, intersections, approaches and private entrances to conform to the typical cross section shown on the approved road construction plan. (11) When an embankment is to be on a hillside or against an existing embankment sloping more than 20 degrees from the horizontal, the slope of the hillside or existing embankment shall be plowed deeply or cut into steps before filling is commenced. All embankments shall be formed by placing and spreading the material in successive, uniform, horizontal layers of not more than six inches in depth for the full width of the cross section and shall be kept level by the use of approved equipment. Embankments over and around pipes, culverts, arches, bridges, or other structures shall be constructed of materials approved by the county engineer. (12) All pipe culverts shall consist of the following materials: a. Reinforced concrete conforming to the requirements of American Association of State Highway Officials (AASHO) M170 Class 3 pipe. b. High density polyethylene (HDPE) corrugated with a smooth interior pipe conforming to the requirements of American Association of State Highway Officials (AASHO) M294M, Type S pipe. All pipe culverts shall be of sufficient size to adequately insure proper drainage. Calculations by a professional engineer licensed by the State of South Carolina must be submitted and approved by the county engineer. Rip-rap shall be securely installed over an approved silt barrier to the height of the high water mark around the end of all pipe culverts. (13) In the event that the engineer, after consultation with appropriate authorities, deems the crossing of a watercourse to necessitate a bridge, such bridge shall conform to current SCDOT specifications for steel reinforced concrete bridges of at least 24 feet in width. Such bridges shall be at an elevation as to be approved by the county engineer. (14) All drainage inlets and outlets not accessible from the road right-of-way must include a permanent easement allowing the county access to the adjacent property needed to perform necessary maintenance work. Oconee County will not be responsible for any damage off of the right -of-way due to high water or flash flood conditions (g) Compaction and testing. Compaction of sub-grade and base courses shall conform to the applicable sections of the latest published edition of the South Carolina Highway Department Standard Specifications for Highway Construction. Nuclear compaction test may be conducted on all sub- bases as directed by the county engineer. A loaded (minimum of 60,000 lbs. gross weight) tandem roll test of the sub -base shall be performed. Any of the compaction tests may be directed by the county engineer or his designated representative during an intermediate six-inch lift. A loaded (minimum of 60,000 lbs. gross weight) tandem Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 9 of 33 roll test will also be performed upon setup of the base material prior to paving the road. Any substandard materials will be replaced and retested as directed by the county engineer or his designated representative. Upon completion of a road, all fills shall be protected by either seeding or rip -rap. All fills of 2½:1 or steeper shall be protected by rip-rap. Shoulders and other disturbed soil along the entire cleared area of the right-of- way shall be seeded in such a manner as to ensure uniform sod. (h) Inspections. (1) A developer/owner shall notify the county engineer at least 48 hours prior to any requested inspection. Work done prior to inspection is done so at the contractor's and owner's own risk and may, upon decision of the county engineer or designee, be required to be removed and redone or have the quality substantiated by any tests deemed necessary all at the contractor's and/or owner's sole expense. Inspections shall be required for the following: a. At the completion of clearing and grubbing operations; b. At the completion of rough grading; c. At the completion of all utility construction along road right -of-way (including but not limited to water, sewer, electrical); d. At the completion of subgrade; e. After installation and compaction of base course; f. During all pavement applications; and g. Final acceptance inspection. (2) The contractor/owner's engineer shall be present for the following inspections: a. Rough grading inspections; b. Subgrade; c. Base course inspections; and d. Final acceptance inspection. (i) Financial responsibility for maintenance. Following acceptance for maintenance by the county of any road, the developer/owner shall be financially responsible for all maintenance necessary due to deficiencies resulting from initial construction for a period of three years. The developer/owner sha ll post a bond or a letter of credit for the estimated cost of maintaining the road for three years from the date of acceptance. The county engineer shall determine the amount of the bond or letter of credit. The bond or letter of credit shall be maintained by the county finance department. The bond or letter of credit shall expire after three years from the date of acceptance of the road, or in the case of a subdivision road, after a build out of 70 percent of the subdivision, whichever occurs first. In order to facilitate the acceptance process, once a road had been substantially completed the developer/owner may request a written punch list from the county engineer. The punch list will note the items that must be completed prior to acceptance of the road by the county. (j) Contracts. Not withstanding any other provision of this section, the owner/developer may utilize an independent contractor to perform road work. In such case, the owner/developer shall be fully responsible for work performed by the contractor on said roads. (k) Financial liability. The owner/developer shall be responsible for all costs in the design and construction of a road until said road is accepted as a county road by the county. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 10 of 33 (l) Road swales and channels. All roadway ditches and channels shall be designed to contain, at minimum, a peak flow from a 25-year frequency storm. All roadway ditches and channels shall be designed so that the velocity of flow expected from a 25-year frequency storm shall not exceed the permissible veloc ities for the type of lining used. Rip-rap shall be placed for stops in road drainage swales as instructed by the county engineer. Swales shall be stabilized against erosion by grassing with a mixture of rye and bermuda grass, or the appropriate grass for the season. Road swales shall be installed at a maximum depth of three feet and be designed to enable mowing by adjoining property owners. (m) Road maintenance signs. Where subdivision roads are not to be dedicated to the state or county for public maintenance the subdivider shall install signs that control traffic flow in a safe manner as specified the manual of uniform traffic control devices. Also, at the beginning of the private subdivision roads there shall be signs which state "Private Road" The subdivider may assume the responsibility to install signs provided the county engineer approves in writing the signage. (n) Roadside drainage. Roads may be constructed with drainage swales shoulders at a 12:1 slope. Where road grade exceeds ten percent, curb and gutter, paved drainage swales, or rip rap swales shall be provided. Curb and gutter may be roll type or standard 90 degrees curb. (o) Temperature and weather restriction on asphalt paving work. (1) No hot mix asphalt surfacing work shall be performed on wet surface, or when the temperature is below 45 degrees Fahrenheit in the shade and falling, or when weather conditions are otherwise unfavorable. unless approved in writing by the county engineer, no surface treatment of a road planned by the owner/developer for acceptance into the county road system shall be begun before March 15 of each year. Unless approved in writing by the county engineer, surface treatment of a road planned by the owner/developer for acceptance into the county road system shall be completed prior to October 15. (2) The mixture shall be delivered to the spreader at a temperature between 225°F and 325°F and, except for sand asphalt mixture for base course construction, within 30°F of the temperature at the plant. (p) Drainage structures. (1) Crossline pipes shall be designed to carry runoff from a 25-year, 24-hour design storm and shall be RCP Class III concrete. The design shall be determined using runoff data sources and standard methods approved by the county engineer. In no event shall a pipe less than 18 inches in diameter be accepted by the county. Crossline pipes or structures along Waters of the State shall be designed to pass a 100 - year, 24-hour design storm. (2) Concrete culverts must conform to South Carolina Highway Department requirements. HDPE double wall corrugated with a smooth interior pipe conforming to the requirements of American Association of State Highway Officials (AASHO) M294M, Type S pipe or an approved equivalent shall be accepted where sufficient fill over the pipe is provided. No corrugated metal pipes shall be accepted. No culvert shall be less than 15 inches in diameter. (3) Unless approved by the county engineer prior to construction, all pipes shall be laid in a trench. All trenches shall be excavated so as to allow for safe and proper installation. All backfill work shall comply with standards specified by the pipe manufacturer; however, in no case shall backfill covering a culvert be less than ten inches deep (pavement and/or base thickness shall no t be considered part of this required minimum depth). All fill shall be compacted to 95 percent of standard proctor test in the top foot of fill. (4) The jointing of sections of culvert shall be done in a workmanlike manner in accordance with the standard practice recommended by the manufacturer of the culvert being used. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 11 of 33 (5) The ends of all pipe culverts shall be properly protected to prevent piping, erosion and scour. Placement of filter fabric and rip-rap shall be considered minimum treatment. End treatments shall be approved by the county engineer and shown on the plans. (6) All crossline drainage culverts shall be located in natural drainage areas or depressions, and shall terminate in a dedicated drainage easement no less than 20 feet wide. (7) Junction boxes of an approved type will be constructed at all points where the line of pipe changes course or direction ten degrees or more and at proper intervals along the line of pipe. (8) A means of access to inlet and outlet points of drainage structure s and appurtenances must be provided and shown on the plans. Oconee County shall not be held liable for flood damage outside recorded drainage easements. (9) Exits for surface water in sideline ditches shall comply with the standards put forth in the foll owing table: Table—Surface Water Exit Intervals Road Grade Maximum Exit Interval 0—2 percent 800 feet 2.1—4 percent 700 feet 4.1—6 percent 600 feet 6.1—8 percent 500 feet 8.1—10 percent 400 feet 10.1—12 percent 300 feet More than 12 percent 200 feet (10) Exit intervals for surface water along curb and gutter roads, also known as catch basin spacing, shall be designed to limit the spread to seven feet from the face of curb. The two -year design storm shall be the basis for determining the stormwater runoff. In no case shall the spacing exceed 800. Special attention should be used designing exits at cul-de-sacs, to prevent overtopping the curb and catch basin. (q) Sidewalks are only permitted in county rights-of-way when they meet the following conditions: (1) A financially responsible entity, as determined by the county in its sole discretion (the "responsible entity"), agrees to perform necessary maintenance and repair to the sidewalk and accepts all real and potential liability arising from the existence and use of the sidewalk. The responsible entity must, prior to sidewalk construction, enter into an agreement with the county that establishes the responsible entity's maintenance, repair, and liability obligations. These obligations will include the duty t o defend and hold the county harmless from any damages or claims for damages in any way related to sidewalk construction, maintenance, and repair. (2) The sidewalk shall be designed by a professional engineer, licensed in the State of South Carolina, to meet the most recent applicable South Carolina Department of Transportation ("SCDOT") minimum standards and be in a form consistent with all applicable SCDOT standard drawings. The sidewalk shall be constructed in strict compliance with the approved design. Sidewalk design and construction must be timely submitted for approval by appropriate county personnel. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 12 of 33 (3) Necessary maintenance and repair of the sidewalk will be performed expeditiously and in a manner consistent with the most recent applicable SCDOT minimum design standards and standard drawings. (r) Sidewalks are only permitted in private rights-of-way when they meet the following conditions: (1) A financially responsible entity, as determined by the county in its sole discretion (the "responsible entity"), agrees to perform necessary maintenance and repair to the sidewalk and accepts all real and potential liability arising from the existence and use of the sidewalk. (2) The sidewalk shall be designed by a professional engineer, licensed in the St ate of South Carolina, to meet the most recent applicable South Carolina Department of Transportation ("SCDOT") minimum standards and be in a form consistent with all applicable SCDOT standard drawings. The sidewalk shall be constructed in strict compliance with the approved design. Sidewalk design and construction must be timely submitted for approval by appropriate county personnel. (3) The final plat submitted for approval and recordation must include the following: "THE SIDEWALK LOCATED IN THE RIGHT-OF-WAY SHOWN ON THIS PLAT SHALL BE PRIVATE, NOT OWNED, MAINTAINED, OR OVERSEEN BY OCONEE COUNTY, AND NOT CONSTRUCTED PURSUANT TO ANY PLAN FOR FUTURE ACCEPTANCE BY OCONEE COUNTY. SIDEWALKS IN RIGHTS -OF-WAY SHOWN UPON THIS PLAT SHALL NOT BE ACCEPTED FOR MAINTENANCE BY OCONEE COUNTY AT ANY TIME IN THE FUTURE. MAINTENANCE OF THE SIDEWALK SHALL BE THE RESPONSIBILITY OF _______." (4) Necessary maintenance and repair of the sidewalk will be performed expeditiously and in a manner consistent with the most recent applicable SCDOT minimum design standards and standard drawings. (Ord. No. 2008-19, Art. 3(1—17), 12-16-2008; Ord. No. 2010-17, § 2A, 9-21-2010; Ord. No. 2022-23, §§ A, B, 10-18- 2022) Sec. 26-4. Commercial and industrial roads and streets. (a) In addition to residential road requirements set forth, the following standards shall apply to commercial and industrial roads. (1) Rights-of-way and road widths. The following right-of-way and road widths are established: a. Right-of-way: Minimum width is 66 feet. b. Roadway width: Width is 24 feet with 12-foot lanes plus two-foot valley gutters or six-inch high curbing and two-foot concrete valley on each side. (2) Grades. a. The minimum grade shall not be less than one percent and the maximum shall not be more than seven percent. b. All proposed street grades, when intersecting an existing street or highway, shall be constructed so as to meet the same horizontal grade at the existing intersection and shall have an elevation for a distance of 30 feet equal to the curb line grade of the existing street to which the proposed connection is being made. All proposed street connections to existing streets or highways having existing sidewalks crossing their intersection alignment shall be constructed by remo val of the sidewalk to the new proposed curb radii. (3) Horizontal (circular) curves. Where a deflection angle of more than five degrees in the alignment of the street occurs, the right-of-way shall be curved. The minimum horizontal radius of curvature at the centerline of the proposed street right-of-way shall not be less than 250 feet. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 13 of 33 (4) Vertical (crest-sag) curves. Changes in vertical grade shall be connected by vertical curves of minimum length equal to 25 times the sum of both approaching grades stated in percent of grade. Example: A five percent slope upward meeting a four percent slope downward requires a curve length of 9 x 25 = 225 feet. (5) Intersecting roads and road offsets. a. Intersecting roads. Industrial/commercial roads shall be laid out so as to intersect as nearly as possible at right angles and no road shall intersect any other road at an angle less than 80 degrees. b. Road offsets. Where there is an offset in the alignment of a road across an intersection, the offset of the centerline shall be not less than 200 feet. (6) Cul-de-sacs. The circular right-of-way radius shall be 66 feet and paved turning circle with the same center point and a radius of 50 feet is required. (7) Temperature and weather restrictions on asphalt paving work. a. No hot mix surfacing work shall be performed on wet surface, or when the temperature is below 45 degrees Fahrenheit in the shade and falling, or when weather conditions are otherwise unfavorable. Unless approved in writing by the county engineer, no surface treatment of a road planned by the owner/developer for acceptance into the county road system shall be begun before March 15 of each year. Unless approved in writing the county engineer, no hot mix surface treatment of a road planned by the owner/developer for acceptance into the county road system shall be done after October 15. b. The mixture shall be delivered to the spreader at a temperature between 225 degrees Fahrenheit and 325 degrees Fahrenheit and except for sand asphalt mixture for base course construction, within 30 degrees Fahrenheit of the temperature at the plant. (Ord. No. 2008-19, Art. 4(1—7), 12-16-2008) Sec. 26-5. Road upgrades. (a) Upgrade of existing county roads. (1) Roads owned and/or maintained by the county shall be listed on a road maintenance plan maintained by the county road department. Any road not meeting the current standards for public roads as adopted by the county shall be identified. Those roads that do not meet the current county standards and are in the primary development areas identified on the county future land use map shall be placed on the priority upgrade list. A rating system shall be used to prioritize the roads on the priority upgrade list, with those roads receiving the highest score having the highest priority. Until the county future land use map is amended in 2009, primary development areas shall include those areas identified in the comprehensive plan defined as residential areas and transitional growth areas. (2) Roads on the priority upgrade list shall be upgraded in such a manner as to account for the curre nt and projected traffic levels. These projections shall be based upon the best information available and anticipate changes occurring over the next 25-year period. (3) The following rating factors shall be used in determining the priority upgrade list: a. Condition and width of driving surface; b. Existing hazards; Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 14 of 33 c. Right-of way acquisition; and d. Current and projected traffic levels. (4) County roads (whether paved or gravel) that are located outside the primary development areas as identified in the county future land use map may be placed on the priority upgrade list based on the recommendation of the county engineer and the agreement of the council's transport ation committee. (5) The county engineer shall review all roads within the county road system on an annual basis and make recommendations to the county planning commission regarding changes to the priority upgrade list. The planning commission shall review the priority upgrade list on an annual basis and make recommendations to county council for changes to the list. The county engineer shall estimate a projected completion date for all roads on the Priority Upgrade List. The county engineer shall update the projected completion date on an annual basis. The county engineer shall consider available funding sources in making these completion projections. (6) In the event that a developer/subdivider is required to upgrade a county road in the primary development area, in accordance with section 26-5(b) of this article, the county and the developer/subdivider shall enter into a reimbursement agreement. The reimbursement agreement shall allow the developer/subdivider to receive reimbursement for the total cost o f upgrading the road to the minimum county road standard. The cost of upgrading a county road may include the cost of right-of-way acquisition and the moving of existing utilities. The cost of upgrading the road shall not include the upgrade of utilities within the road right-of-way. The source for reimbursement shall be from rollback taxes, if any, and the incremental tax increase of property resulting from New Development accessed by the upgraded road. The reimbursement agreement shall include not more than ten percent of any rollback taxes on the property to be developed and such percentage of said incremental tax increase sufficient to allow the developer/subdivider to receive reimbursement for his/her/its total cost in upgrading the road over a period of time not to exceed ten years from the date that the county approves the final plat and the plat is recorded. Any reimbursement agreement shall only include the county portion of any rollback tax or incremental tax increase. (7) A developer/subdivider who is planning a development that will impact a county road in such a way that the road classification will change, and said road is already scheduled to be upgraded by the county within the next five years, according to the Priority Upgrade List, may be as signed a higher priority on the Priority Upgrade List by agreeing to allocate ten percent of the proposed development for affordable housing or provide the same amount of affordable housing in another location in the county. Affordable housing provided in this section shall be of the same type of construction (ex. stick built, modular, etc.) as the new development. (b) Impact on existing roads system. In order for the county to approve a subdivision site plan, a subdivision plat or a building permit for a subdivision project, the county road or network of county roads that serve said proposed development must be adequate to accommodate any increase in traffic resulting from said proposed development. For all developments consisting of more than ten dwelling units, the developer/subdivider shall submit a traffic impact/road capacity study demonstrating the impact of traffic upon any county road servicing the subdivision, either directly or indirectly. The extent of the study shall be determined by the county engineer on a case by case basis. The traffic impact/road capacity study shall be reviewed by the county planning director and the county engineer. In the event that the county planning director and the county engineer determine that the subdivision will increase the average daily traffic (ADT) on a county road to the extent that said road will need to be upgraded to safely accommodate the increase in traffic, improvements to the road must be made in accordance with the road classification set forth in the definitions section of the land development and subdivision regulations ordinance (Ordinance 2008 -20 [as Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 15 of 33 codfied in chapter 32, article VI, §§ 32-211—32-226]). The developer/subdivider shall be responsible for all costs (including right-of-way acquisition) necessary to upgrade the road. (c) Criteria for road improvement projects. (1) A minimum of 50 feet of right-of-way is required for the entire road. (2) Utilities must not be located, to the extent practicable, beneath the road surface (excluding sanita ry sewer). (3) A minimum of 50 feet radius of right-of-way is required for the purpose of constructing an appropriate turnaround for improvements projects along terminating roads. (4) Road improvement projects to match existing county standards, to the e xtent practicable. The above criteria shall apply to paved and unpaved road improvement projects. From time to time, council may need to waive the above requirements on a case-by-case basis. (d) Scoring gravel roads. (1) A trip generation prediction will be calculated with data collection and other methods outlined by the Institute of Transportation Engineers. (2) ADT (Modeled or Measured Average Daily Trips) will be combined with safety Parameters as follows: Slope or grade X 20 points Intersection X 20 points Width X 20 points No Cul-de-sac X 20 points Alignment X 20 points (3) ADT and safety parameters will be the primary factors in scoring gravel roads. (4) For example, if traffic counts were measured to be 480 ADT; and the slope exceeded 12 percent, it was 20 feet, and had no cul-de-sac the score would equal 480 + 60 = 540. (Ord. No. 2008-19, Art. 5(1—4), 12-16-2008) Sec. 26-6. Acceptance of roads into county road system. The following provisions shall apply to the construction of any road intended for future acceptance into the county road system. (1) No road shall be accepted by the county for maintenance and incorporated within the county road system unless the same be shown and delineated upon a plat of survey duly recorded in the office of the county Register of Deeds. (2) A construction plan with sufficient detail, including a cross section of the proposed road, shall be submitted to the county engineer prior to commencement of construction. No construction shall commence unless the plan has been approved by the county engineer. (3) A deed granting a right-of-way as specified in this article shall be tendered to the county by the property owner/developer before a road shall be accepted into the county road system. Upon acceptance of such deed or right-of-way by the county, the owner/developer shall be notified in Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 16 of 33 writing of the fact of such acceptance, and the same writing shall constitute an agreement on the part of the county to maintain and incorporate the said road into its system. The county administrator shall accept or deny the proffered deed or right-of-way for the county upon receipt of certification by the county engineer that said road has been constructed in accordance with the regulations set forth in this article. (4) Prior to acceptance by the county for maintenance and incorporation within the county road system, all roads shall meet all road construction standards set forth in this article. (5) No road shall be accepted into the county road system until the surface is treated in a manner and using such materials as approved by the county engineer. The county engineer shall furnish specification requirements upon request. The county engineer shall be notifi ed by the developer/owner prior to the commencement of any construction, and shall be given periodic progress reports and periodic inspection reports as specified by the county engineer. Such progress and inspection reports are to include notification of the ending and planned commencement of construction intervals or phases. The county engineer shall certify in writing to county council that the road to be accepted into the county road system has been constructed in accordance with the regulations set forth in this article. A copy of the certification shall be sent to the county administrator. (6) The county may accept a road as a county road through the creation of a special tax district, a legislatively created administration division of the county whereby resident freeholders fund, through the collection of uniform fees included on the annual property tax bill, upgrades to existing private roads in order for such roads to meet the standards of and for the purpose of acceptance into the county road system. (7) No expenditures of any public funds shall be made on any road or right -of-way, which has not been accepted as a county road. (8) The roadway must connect to at least one federal, state, county, or municipal roadway. (9) The county administrator is hereby authorized to accept roads and rights-of-way on behalf of county. (Ord. No. 2008-19, Art. 6, 12-16-2008) Sec. 26-7. Regulating the use of county roads. (a) Connection to, or easements or rights-of-way on county roads. Notwithstanding any other provision of this Code, all connections to county roads, whether temporary or permanent, such as, without limitation, driveway cuts, logging or construction cuts, roadway intersections, and every other form of connection, must be approved in writing, in advance of any such connection, temporary or permanent, by the county engineer, in accordance with subsection 26-3(e)(10) hereof. The county may only authorize encroachments or grant easements or rights -of-way, for any purpose, on those county roads for which it owns the right to do so, such as on rights -of-way deeded to the county in fee simple title. For other roads, such as those for which the county owns less than fee simple title, such as roads for which the county has only prescriptive easements, the county may only grant encroachments, easements, and rights-of-way consistent with its interests. Any encroachment, easement or right -of-way granted by the county on a county road must be approved in writing by the county engineer after making a full investigation of the matter and considering all factors, including the applicant's needs, as well as the needs of the county, including, without limitation, good engineering standards, the need to maintain county rights -of-way and keep them open, the convenience of the traveling public, and other similar professional considerations. If the county engineer approves such encroachments, easements, or rights-of-way, the easements or rights-of-way may only be granted by county Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 17 of 33 council, by ordinance, following a public hearing as a conveyance of interests in real property. The county engineer may approve encroachments properly undertaken in accordance with this chapter. (b) Work on county right-of-way. Property owners adjoining the county road right-of-way may request that the county perform work within the right-of-way to install new driveway aprons, mailbox turnouts, and/or culverts within the county maintained right-of-way. The county, at its sole discretion, may elect to perform such work on a first pay, first scheduled, time-available basis. If the county performs such work, the property owner shall pay 2.5 times the material costs to cover the material cost and labor for said project. The property owner shall sign a hold harmless agreement releasing the county from any liability associated with said work, in advance of scheduling the project. If the county constructs such driveway aprons, mailbox turnout, or culverts within the county right-of-way, such work will be maintained by the county as a part of the county road system from that point. The county engineer, or his designee will provide a nonbinding, cost estimate for the material cost of the project. Special services or equipment needed to complete the job will be billed as invoiced b y the contractor or vendor providing the special service or equipment. (c) Drainage. (1) Property owners adjoining the road right-of-way may request that the county perform work to assist the property owner with a drainage problem. The county may, at its sole discretion, construct berms, swales and/or ditches, or install pipe along the county maintained road right -of-way. The property owner shall pay 2.5 times the material costs to cover the material cost and labor for said project. The property owner shall sign a hold harmless agreement releasing the county from any liability associated with future drainage problems, in advance of the county considering and scheduling such project. Such projects will be scheduled, if at all, on a first pay, first scheduled , time-available basis and will be maintained by the county, as a part of the county road system from that point. (2) The county engineer or his designee, will provide a cost estimate for the material costs of the project. Special services or equipment needed to complete the job will be billed as invoiced by the contractor or vendor providing the special service or equipment. (3) The county cannot assist in any drainage matter outside of the road right -of-way, and may only perform work within the county right-of-way. (4) No property owner or any other person shall modify any drainage in any manner that affects a county road without the written approval, in advance, of the county engineer. (d) Damages. (1) Any person, entity or utility that engages in an activity which causes damage to a county road or road structure shall be responsible for repairing said county road or road structure to SCDOT standard specifications for highway construction. This does not include normal wear and tear to a road caused by normal use of said road. (2) Any person driving, operating or moving any vehicle, object or contrivance upon any county road or road structure shall be liable for any damage which road or structure may sustain as a result of dragging, scraping, breaking or any other damage done to said road or structure. Any such persons will also be liable to the county for the cost of such injury or damage. (e) Encroachment. (1) All persons desiring to excavate within, encroach upon, or in any way alter a county maintai ned road and/or right-of-way, shall notify the county engineer and submit to the county road department an application for an encroachment permit, together with the required fees and security as determined and established periodically by county council. Notice will be given by the applicant to the county at Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 18 of 33 least 48 hours prior to initiating such work, and only after receiving an approved permit from the county. A schedule of required fees and securities shall be available for review from the county road department. No person may excavate within, encroach upon, or in any way alter a county maintained road or right-of-way without the written approval, in advance, by approved permit, of the county engineer. In determining whether to approve any such request, a nd issue a permit, the county engineer will consider all factors, including the needs of the applicant, as well as the needs of the county, including, without limitation, good engineering standards, the need to maintain county rights - of-way and keep them open, the convenience of the traveling public, the applicant's compliance with previous permits, including temporary permits, and policies of the county, and other similar professional considerations, including, without limitation, the provisions of the enc roachment permit policy (encroachment permit policy) which is maintained by the Oconee County Road and Bridges Department and approved by county council from time to time and is included herein by reference. The county engineer may impose restrictions on any granted approval and permit under this section, consistent with such professional considerations; including, without limitation, up to and including temporary suspension or permanent revocation of such permit, for failure to comply with the permit terms or these policies. Any appeal from any decision of the county engineer under this section will be treated as a request for a variance from road standards and handled in accordance with the procedures of section 26-8 of this Code. Oconee County Council shall, from time to time, approve the county's encroachment permit policy, including, without limitation, the policy itself, as well as the encroachment permit application form, and the schedule of fees for the application of the policy. The initial encroachment permit policy, encroachment permit application form, and fee schedule are attached as exhibits to this section, and are hereby approved. For minor nonsubstantive revisions, the county, acting by and through the county council, may revise the policy, application form, or fees, as it desires, in the future by simple resolution of county council, and may include the fees schedule in the schedule of departmental fees that is contained in a proviso in the annual county budget ordinance. More substantial, and all substantive revisions to policy, application form, and fees must be revised by county council ordinance, including, without limitation, the annual county budget ordinance. (2) Upon completing the permitted activity, the applicant shall restore the c ounty maintained road and/or right-of-way to its original condition (except for any permanent alteration approved by county permit, and through a county-granted right-of-way or easement), insuring that all repairs conform to the requirements contained in the SCDOT standard specifications for highway construction and the encroachment permit policy. Eighteen months after the permitted activity is satisfactorily completed, the security shall be returned to the applicant provided the county engineer, upon final inspection, approves the repair. If the county engineer deems the repair to be unacceptable, the security shall be retained by the county and used to properly repair and restore the road and/or right -of-way to its original condition. Once the road and/or right-of-way has been properly repaired, any excess security will be returned to the applicant, it being understood that, in one form or another, all costs of encroachment upon, or any alteration of a county maintained road or right -of-way shall be borne by the applicant. (3) Driveway aprons and mailbox turnouts abutting county maintained roads are encroachments, subject to the provisions of this section, and will be the responsibility of the property owner, as to construction and maintenance, subject to the provisions of subsection 26-7(b), and subject to the caveat that if the county constructs or manages a road project, driveway aprons and mailbox turnouts may be part of the project, subject to the terms of such subsection 26-7(b). (4) Violation of the encroachment permit policy is a violation of this Code and is punishable by civil fine of $500.00/day/violation. Each and every day of a continuing violation shall be deemed a new and Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 19 of 33 separate offense. Failure to pay any civil fine levied hereunder shall c onstitute a violation of this Code and shall be punished in accordance with section 1-7, hereof. (f) Road safety. (1) All persons shall park vehicles and equipment at least three feet from the edge of the driving surface on all roads. Parked vehicles and equipment shall not block ditches and swales or in any way inhibit drainage. (2) No person shall place any type of material within three feet of the driving surface. (3) No person shall place a sign on a road in the county that will restrict visibility or inhibit sight lines of drivers. (4) Signs (other than these regulated by state or federal law, such as political signs) remaining in place for more than seven days on county roads, will require an encroachment permit from the county road department. (g) Inspections. A developer/owner or any other affected entity shall notify the county engineer at least 48 hours prior to any requested inspection required by this chapter for public or private roads. Inspection fees, for such inspections, shall be established by resolution, ordinance or other official act of county council from time to time, and must be paid, in full, before the county will finally accept the road(s) in question. All such fees, once paid, shall be maintained by the county in a separate account used only for the road inspection program of the county, and will only be in such amount(s) as will be sufficient to maintain such program. Work done prior to inspection is done at the contractor's and owner's own risk and may, upon decision of the county engineer or designee, be required to be removed and redone or have the quality substantiated by any tests deemed necessary, all at the contractor's and/or owner's sole expense. Inspections shall be required for the following: (1) At the completion of clearing and grubbing operations; (2) At the completion of rough grading; (3) At the completion of all utility construction along road right-of-way (including but not limited to water, sewer, electrical); (4) At the completion of subgrade; (5) After installation and compaction of base course; (6) During all pavement applications; and (7) At final acceptance inspection. (h) Penalties. Failure to comply with any of the requirements of this article constitutes a misdemeanor and shall be punishable as set forth in section 1-7. In addition, in the event that the county must file a civil suit in order to enforce its rights under this article, the county shall be entitled to reasonable attorney's fees. (Ord. No. 2008-19, Art. 7(1—5), 12-16-2008; Ord. No. 2010-17, § 2B, 9-21-2010; Ord. No. 2013-16, § 2B, 7-16-2013) Editor's note(s)—The Oconee County Roads and Bridges Department Encroachment Permit Application and Policy are incorporated herein by reference as if fully set out at length. A copy is on file and available for inspection at the offices of the county. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 20 of 33 Sec. 26-8. Variance from road standards. (a) Any variance from these road standards shall be consistent with the intent of this article, and shall be approved in writing by the board of zoning appeals. Any person or entity requesting a variance from road standards shall submit a written request for a variance to the planning director of the county. A variance can only be granted for actions to take place in the future. No variance may be granted for past actions. (b) Prior to scheduling a variance hearing before the board of zoning appeals, the person or entity requesting said variance shall work with the county planning department and the county road department in an effort to eliminate or minimize the need for a variance. After reasonable efforts and no other solution can be reached, a hearing shall be scheduled before the board of zoning appeals. The county staff shall submit written reports to the board of zoning appeals setting forth the county regulation in question, the efforts made to remedy the situation, and a recommendation setting forth the county's position regarding the variance. These written reports shall be submitted to the person or entity requesting the variance at least five days before the variance hearing. (c) Notice of the variance hearing shall be provided by first-class mail to the person or entity requesting the variance at least 15 days prior to the hearing. Notice of the hearing shall also be published in a newspaper of general circulation in the county at least 15 days before the hearing. (d) Any party may be represented by counsel. Any person or entity that would be directly impacted by the granting or denial of the variance may participate as a party in the hearing, provided notice of intent is submitted in writing to planning department at least seven days prior to the hearing. The planning department shall immediately notify all other parties of the new party's participation. The county may support or oppose the variance request or be neutral. (e) The board shall make the initial determination concerning the variance request and may consider any and all evidence it deems relevant concerning the variance issue. The paramount issue for all variance requests shall be the reasonable safety of the road under the proposed circumstances. If the board concludes that a safe road can be constructed without strict application of the regulations set forth in this article or other county ordinances and policies, the board may then consider issues such as the cost of right -of-way acquisition, placement of utilities, and unusual circumstances in determining whether to grant a variance. The board should use reasonable discretion in its decision making. (f) A person or entity whose request for a variance has been denied by the board may appeal the board's decision to the transportation committee of the county council. (Ord. No. 2008-19, Art. 8, 12-16-2008) Sec. 26-9. Road closure and abandonment. (a) Prior to any request for abandonment and closure of an Oconee County public road being brought before county council, county staff, including, without limitation, the Oconee County Roads and Bridges Department, will conduct a thorough investigation, adequate to determine: whether the road in question is, or ever has been, a county road; whether the road still is a county road; whether the road is still in general public use or has been practically abandoned; whether the county has any documentation relating to the status of the road, such as a dedication of right-of-way or easement, or a deed, or whether such road was subject to a prescriptive easement or easement by usage; whether there is any other information which would assist county council in determining whether the best interests of the Oconee County public will be served by consenting to the abandonment and closure of the road in question or by not so consenting. As a part of the investigatory process addressed herein, the Oconee County Roads and Bridges Department will Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 21 of 33 post, adjacent to the road in question, a sign, marked so as to be as conspicuous as possible, pro minently providing notice that the road, or portion thereof abutting the sign, is proposed for abandonment and closure, soliciting citizen comments concerning such proposed abandonment and closure, and providing notice of address and telephone number at the Oconee County Public Works Department to which concerned citizens may forward comments concerning such proposed abandonment and closure. (b) Following the investigation referred to in paragraph 1, supra, county staff will make a recommendation to the Transportation Committee of Oconee County Council, which, in turn, will make a recommendation to Oconee County Council as to whether the request for abandonment and closure should be honored or not, and provide the results of the staff investigation to count y council for its use and final determination whether the county will consent to such abandonment and closure. Included with the recommendation will be any public comments received and the recommendation(s) of county staff and the transportation committee. (c) County council shall then, in public meeting, make a determination as to whether the request for abandonment and closure should be consented to by the County, acting by and through county council, and shall signify its decision by motion, if such decision be negative, and shall signify its decision by resolution of county council, if such decision be positive. (d) If county council consents to the abandonment and closure of a county public road, as addressed herein, the resolution of county council consenting to such abandonment and closure shall state, with particularity, the road, or section thereof, to be closed; the basis for county council's decision to consent to the abandonment and closure of the road; and the absolute requirement that, prior t o the road, or portion thereof, in question being closed, the primary private party(ies) in interest (unless the county, itself, is the party requesting the road closure, in which case the county will be the primary party in interest to comply with this se ction) shall fully comply with all applicable law, including, without limitation, S.C. Code 1976, § 57- 9-10, as amended, and shall provide all required notice and service of process. Only upon the meeting of such conditions and the fulfillment of such procedures will the county council consent to such abandonment and closure be considered final, and that shall be stated in such resolution. (Ord. No. 2010-28, §§ 1—5, 10-19-2010) Sec. 26-10. Legal provisions. (a) These regulations expressed in this article shall be considered as the minimum provisions for the protection of the health, safety, economy, good order, appearance, convenience, and welfare of the general public. (b) Conflict with other laws, ordinances, or regulations. Whenever the requirements made under authority of these regulations impose higher standards than are required in any statute or local ordinance or regulation, provisions of these regulations shall govern. Whenever the provisions of any other statute or local ordinance or regulation impose higher standards than are required by these regulations, the provisions of such statute or local ordinance or regulations shall apply. (Ord. No. 2008-19, Art. 9(16.1, 16.2), 12-16-2008; Ord. No. 2010-28, § 5, 10-19-2010) Sec. 26-11. Identify roads in the county road system. (a) Purpose. The purpose of this section is to establish the criteria, method and means of identification of all roads making up and comprising the Oconee County (the "county") road and highway system (the "county road system") and to discontinue from the county road system those streets, roads and highways found by the county to be useless and unnecessary for the convenience and necessity of the general public. Nothing Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 22 of 33 herein shall be deemed to amend, alter, or revoke, in any regard section 26 -6 of the Oconee County Code of Ordinances (the "Code of Ordinances"), relating to the acceptance of roads into the county road system, nor any other section of chapter 26 of the Code of Ordinances, except as explicitly addressed herein. (b) Oconee County road map. The county department that currently maintains the Geographic Information System (the "GIS") of the county shall maintain in its office a map of the county and such other records as may be deemed necessary or convenient showing the location and number of each roadway wi thin the county which is a part of the county road system (the "county map"). On the direction of the Oconee County Council, in accordance with policy established by the Oconee County Council and actions of the Oconee County Council, the public works director shall request the county department that maintains the GIS to make such additions and deletions of road and highway sections upon such county map, as may be necessary to keep such county map current as conclusive evidence of the existence of a county r oad or highway. The public works director shall review such additions and deletions of road and highway sections, made through the GIS, to such county map for accuracy and shall inform the county administrator that such county map has been updated appropriately. At such time, the county administrator shall inform the county council that such county map has been updated as directed by county council. Where practical, written rights -of-way shall be obtained on roads and highways maintained by the county. Prov ided, however, recognizing that many roadways presently a part of the county road system have been acquired by prescriptive right or use, written easements or deeds of right-of-way shall not be necessary to conclusively establish the existence of a county road. All newly-constructed county roads, including subdivision roads, shall become a part of the county road system only in accordance with section 26-6, hereof, and only when granted by written instrument, either by deed or dedication on plats of subdivisions duly filed in the office of the clerk of court which are formally accepted by the administrator of the county, pursuant to policy established by the Oconee County Council. Notwithstanding any other provision of this section, it shall not be necessar y to notify the Oconee County Council when merely the name of an existing county road or highway section, which is currently included in the county road system, as evidenced by the inclusion of the road or highway section in the county map, is changed on the county map in accordance with existing county policy and procedures, to keep such county map current. (c) Findings of fact. The Oconee County Council, by this section, declares the following findings of fact: (1) An attempt has been made and will continue to be made to identify all roadways located in the county which are useful and necessary for the traveling public and have been designated and treated by the county as county roads; and (2) Such roadways have been maintained by the county since at least January 1, 1981, or have been dedicated to and accepted by the county in accordance with then-current county policies as county roads; and (3) There exist many roadways which were formerly maintained by the county, upon which maintenance is no longer required by reason of disuse or which were maintained by the county under circumstances possibly contrary to the statutory law of this state, none of which have ever been accepted by the county as county roads or designated as such in accordance with then- current county policies. (d) Official roads; discontinuance of all other roads as Oconee County roads. Based upon the continuing findings of fact of the Oconee County Council set out by subsection (c) hereof, the official road and highway system of Oconee County shall include only the following roads as Oconee County roads: (1) Those unpaved roads or highways continuously maintained by county equipment as duly authorized by the administrator (or his/her predecessor) of the county since January 1, 1981, and thereafter, and treated as and called county roads; and Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 23 of 33 (2) Those roadways, streets or highways accepted into the county road system since January 1, 1981, by reason of and in accordance with the provisions of the Code of Ordinances pertaining to non- subdivision roads, including newly-constructed roads, and subdivision roads; and (3) All paved or asphalted roads running in and through the county other than roads and highways of the state and federal highway systems, and roads designated on the county re cords as "private roads", upon receipt of evidence satisfactory to the county administrator and public works director that such road(s) are, in fact, public roads of the county, including, without limitation, through proof of dedication to public use and acceptance by the county, or by proof of continuous use and maintenance as public roads by the county for the period of time as statutorily required by Section 15 -67-210, et seq., of the Code of Laws of South Carolina, 1976, or successor legislation, as ame nded, to establish adverse possession, or other good and sufficient proof; provided, however, any portion of a paved road which has been barricaded or blocked because of the construction of Lakes Keowee, Hartwell or Jocassee shall not be considered part of the county road system from the point of the blockade and shall not be maintained by the county. Upon the identification of any such "orphaned" sections of roads which were previously county roads, actions shall be initiated by the county pursuant to Sect ion 57-9-10, et seq., of the Code of Laws of South Carolina, 1976, as amended, to make such orphaned parts be judicially closed and abandoned and title thereto vested as dedicated by the courts. Notwithstanding any other provision of this section and upon recommendation of the administrator or the Oconee County Council, on a case-by-case, specific basis, and only for good and sufficient cause shown, of record, any other road may be declared by the Oconee County Council to be a part of the county road system. No other roads are part of the county road system, nor shall they be part of the county road system without dedication to public use and acceptance by the county in strict accord with the Code of Ordinances. Only roads that are part of the county road system in accordance with this section shall be reflected on the county map as county roads. (e) Status of abandoned state highways and roads within municipalities. Notwithstanding the provisions of Section 57-5-120 of the Code of Laws of South Carolina, 1976, as amended, any section of the state highway system so abandoned outside the limits of any municipality located in the county shall not become a part of the county road system unless specifically accepted by the county as a county road or highway and the abandonment of such road or highway by the State of South Carolina shall be prima facie evidence that the same is useless and not necessary or convenient for use by the public of the county. By appropriate action, however, the county may accept and incorporate any such abandoned roadway into its county road system, at the Oconee County Council's sole discretion, and in accordance with this chapter. In the event a county municipality's boundaries are expanded, through annexation or other such action, a nd such expanded boundaries then encompass or include any part of a road that has previously been maintained by the county and incorporated as a county road into the county road system, as evidenced by such road's inclusion in the county map, the municipality whose expanded boundaries then encompass such road portion shall be solely and exclusively responsible for all maintenance, of whatever kind, of such road portion in accordance with Section 5-27-110 et seq., of the Code of Laws of South Carolina, 1976, as amended. Such road portion, only (not the remainder of the road which is not annexed), shall be removed from the county road system and the county map, in accordance with the guidelines and procedures set forth in this chapter, and such road portion shall henceforth be a road of that municipality and shall no longer be a county road. (Ord. No. 83-7, §§ I—V, 8-16-1983; Ord. No. 2013-08, § 2(Exh. A), 1-21-2014) Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 24 of 33 Sec. 26-12. Acceptance of certain unpaved roads. (a) Rudimentary roads. There is hereby established a class of public roads to be known as "rudimentary roads." (b) Rudimentary road program. There is hereby established a rudimentary road program (the "program") by which the county may receive and accept a limited number of substandard roads into the county public road system for minimal upgrade and minimal maintenance as rudimentary roads. (c) Criteria for substandard roads to be accepted into the program. In order for a substandard road to be accepted into the program it must meet the following criteria: (1) The road must serve 11 or more occupied residences. (2) The road must be unpaved and in a state of severe disrepair, such that it may be impassable by emergency vehicles or otherwise dangerous. (3) The county must be deeded a 50-foot right-of-way easement, with language acceptable to the county, to carry out all tasks necessary herein for the length of the road to be accepted by the county. The road must be centered within the deeded right-of-way. (4) The road must have a cul-de-sac at its termination point, if any. (5) All property owners adjacent to, and served by, the road must agree to remove any structures, improvements, debris, etc. that exist within the right-of-way. (6) All property owners adjacent to, and served by, the road must agree to accept the conditions and results of limited upgrade and maintenance, as well as resulting stormwater runoff. (7) All property owners adjacent to, and served by, the road must agree that use of the road by the general public will be unrestricted. (8) All property owners adjacent to, and served by, the road must agree to release, indemnify, and hold the county harmless from any claims or damages arising, or alleged to have arisen, from or in any way related to the program established hereby. (9) The road shall be subject to an emergency service access review. (d) Petition for acceptance into the program. (1) The county's roads and bridges department shall establish a petition containing the elements outlined in subsection (c) above, to be completed and submitted by the community requesting acceptance of a substandard road into the program. The petitioning community is solely responsible for all costs associated with compiling a complete petition, including but not limited to costs related to any necessary investigations, surveys, agreements, deeds and/or rights -of-way. (2) The county engineer shall review the petition and provide a "staff report" determining whether the petition is complete. (3) Complete petitions, along with the staff report, shall be submitted to the transportation committee of the county council, which in turn will provide the staff report to the county council, making a recommendation as to whether the petition for acceptance into the program should be accepted or not. Included with the recommendation will be any public comments received. The county council shall then, in public meeting, make a determination as to whether the petition for acceptance into the program should be approved by the county or not. If the county council approves the petition, it shall signify so by resolution. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 25 of 33 (e) Minimal upgrading and maintenance standards established for rudimentary roads. Once accepted into the program, the subject road will be minimally upgraded and maintained as follows: (1) The road shall be upgraded to a width of 20 feet and be centered in the 50 -foot right-of-way. (2) The road's center line's vertical and horizontal alignment shall remain in roughly the same orientation as its pre-existing condition. (3) The road surface shall be upgraded to a minimum thickness of six -inch compacted stone. It shall not be paved. (4) The shoulders of the road shall extend four feet from the road surface. (5) From the edge of the shoulders there shall exist, or be constructed, 18-inch deep ditches, with a minimum 2:1 slope. (6) There shall exist or be constructed tail ditches at frequent intervals (e.g., every 400 feet). (7) Any existing drainage pipes shall be extended to accommodate the new road width. (8) If the road terminates, as opposed to intersects with another public road, a cul -de-sac with an 80-foot diameter shall be constructed. In this case, a deeded right-of-way of 100 feet shall also be required for the subject area. (9) No maintenance of storm drains, pipes, ditches, culverts, catch basins, etc. will be performed by the county. (10) Maintenance (limited to blading and stone replacement) shall be on an as needed basis but not to exceed one time per calendar year, barring the need for emergency-related work as determined by the roads and bridges department. (11) Any upgrades occurring after the initial minimal upgrades performed by the county must meet current county standards for public roads (thus removing the subject road from the rudimentary road class) be approved by the county in writing, and be paid for by the residents. (f) Relation to other ordinances, resolutions or other enactments. (1) As the provisions of this section create a distinct program by which the county may receive and accept a limited number of substandard roads into the county public road system for minimal upgrade and minimal maintenance as rudimentary roads, this section does not operate to repeal or rescind any existing ordinances, resolutions, or other enactments of the county to the extent there exist any conflicts herewith. Nonetheless, any such conflicts do not operate to preclude the effect of the provisions contained herein. (2) To the extent any ordinance, resolution, or other enactment of the county does not conflict with the provisions and intent of this section, such ordinance, resolution, or other enactment applies here with equal force. (g) Miscellaneous. (1) Rudimentary roads shall not be eligible for improvements as contemplated by section 26- 5. (2) Subdivisions will not be permitted/allowed along rudimentary roads. (3) Additional ingress/egress encroachments along rudimentary roads are prohibited. (4) Rudimentary roads are subject to such other limitations and restrictions as the county administrator, in his or her sole discretion, shall deem necessary for carrying out the intent of this section while not otherwise impacting the integrity or purposes of the county public road system. Created: 2026-05-07 10:21:26 [EST] (Supp. No. 55) Page 26 of 33 (5) Operation of the program may be significantly limited or completely suspended based on existing budgetary constraints. (Ord. No. 2016-16, §§ 1—7, 6-7-2016) Secs. 26-13—26-100. Reserved. ARTICLE II. ROAD NAMING AND ADDRESSING Sec. 26-101. Name. The name of this article shall be the "Oconee County Road Naming and Addressing Ordinance". (Ord. No. 2007-10, § 1, 7-17-2007) Sec. 26-102. Purpose and intent. It is the purpose of this article to enhance efficient emergency response and further the orderly development of the county by establishing standards for the naming of roads and assigning addresses to structures, and to provide for the creation of office policies and procedures to assist the staff in implementing these standards. (Ord. No. 2007-10, § 2, 7-17-2007) Sec. 26-103. Authority. This article is adopted pursuant to provisions of S.C. Code 1976 Title 23, Chapter 47; and Title 6, Chapter 29. (Ord. No. 2007-10, § 3, 7-17-2007) Sec. 26-104. Jurisdiction. This article shall apply to all areas within the boundaries of the county that are designated by the State of South Carolina to be the responsibility of the county in the naming of roads and addressing. (Ord. No. 2007-10, § 4, 7-17-2007) Sec. 26-105. Finding of facts. The county council hereby establishes and adopts the following standards to regulate the assignment of road names and addresses, and to establish penalties such as are necessary to discourage activities that impair effective implementation of this article. (Ord. No. 2007-10, § 6, 7-17-2007) Created: 2026-05-07 10:21:27 [EST] (Supp. No. 55) Page 27 of 33 Sec. 26-106. Road naming. (a) The county planning commission shall approve and authorize road names pursuant to S.C. Code 1976 § 6-29- 1200 and § 23-47-60. To this end, the planning commission may establish policies and procedures as necessary to enable staff to carry out this directive in the most efficient and equitable manner possible. (b) All policies and procedures governing road naming shall be contained in a public document entitled, "Oconee County Road Naming and Addressing Policies", which may be amended by the county planning commission from time to time as necessary. (c) The county planning commission shall maintain a master list of a road names assigned in the county. (d) Appropriate fees may be established by resolution of county council from time to time to cover costs related to road naming. (Ord. No. 2007-10, § 6, 7-17-2007) Sec. 26-107. Road signage. (a) All road signage shall meet the standards put forth in the Federal Highway Administration's Manual of Uniform Traffic Control Devices, and policies outlined in the "Oconee County Road Naming and Addressing Policies." (b) Appropriate fees may be established by resolution, ordinance or other official act of county council from time to time to cover costs related to road signage. (c) All costs associated with the installation of signage in a new subdivision shall be borne by the developer/owner. (d) All costs associated with changing signage on an existing road for nonemergency related reasons shall be paid by the party initiating the change. (e) Property owners' associations ("POAs") and homeowners' associations ("HOAs") which are properly organized as legal entities and insured to the satisfaction of county council, and which satisfactorily demonstrate to county council the financial ability to do so, may reques t the county, acting by and through the county council, to enter into a legally binding agreement with such POA/HOA authorizing the POA/HOA to maintain road signage within its respective community, subject to: agreeing to indemnify the county and hold the county harmless as to all harm, damages, or liability which might occur because of the POA/HOA's maintenance of such signage; compliance with subsection 26-107(a) hereof; complete payment by the POA/HOA of all costs of any type associated with maintaining such signage; and maintenance by the POA/HOA of adequate insurance, naming the county as an additional insured, to fulfill its obligations hereunder and thereunder. If the POA/HOA meets all conditions of this subsection, it may utilize signage of its own design and choosing, consistent with county roads and bridges department policies as to sign background color, lettering style, and inclusion of road number designation on street name signage, to the satisfaction of county council, in that respective community. (Ord. No. 2007-10, § 7, 7-17-2007; Ord. No. 2010-17, § 2C, 9-21-2010; Ord. No. 2012-21, § 2, 7-17-2012) Sec. 26-108. Addressing and numbering. (a) A uniform system of assigning address numbers for properties, principal buildings, and other structures shall be implemented in conformance to S.C. Code 1976 § 23-47-60. Created: 2026-05-07 10:21:27 [EST] (Supp. No. 55) Page 28 of 33 (b) All addresses assigned after the adoption of these standards shall be unique within the jurisdiction of these regulations, and comply with the standards put forth in the "Oconee County's Road Naming and Addressing Policy." (c) Addresses existing at the time of the adoption of these standards may be changed as necessary to provide for an efficient emergency response, and to accomplish the purpose and intent of state regulations and this article. Any address found to present a potential threat to the health; safety and welfare of the public shall be changed as soon as is practicable. (d) Written notification of assigned addresses shall be provided to the owner, occupant, or agent of each building in all instances of new or changed addresses. (e) Assigned addresses shall be displayed in such a manner as to meet all applicable state and local standards. (Ord. No. 2007-10, § 8, 7-17-2007) Sec. 26-109. Appeals. Appeals to a decision made by the county addressing staff must be submitted in writing to the planning director, and must indicate the specific reason for the appeal. The planning director shall forward all appeals to the planning commission, who shall act on the appeal pursuant to the standards established in S.C. Code 1976, Title 6, Chapter 29. (Ord. No. 2007-10, § 9, 7-17-2007) Sec. 26-110. Administration and implementation. The county addressing office shall assign all addresses issued in the county pursuant to state regulations and the standards contained in this article. The addressing office shall be the sole party authorized to issue addresses within the jurisdiction of this article. Every owner, agent, or other responsible party of each house, building or other addressed structure shall display the correct address in such a manner as is necessary to meet the standards put forth in this article. Specific guidelines related to displaying addresses shall be available from the addressing office. (Ord. No. 2007-10, § 10, 7-17-2007) Sec. 26-111. Enforcement. No building permit, land use permit, or other county-sanctioned authorization shall be issued for any building, structure, development or other usage until appropria te addresses have been assigned. Final approval of any structure erected, repaired, altered, or modified after the effective date of this article shall be withheld by the building official until such time as the appropriate address has been properly poste d. Failure to post and maintain appropriate signage or addressing as required by this article shall be considered a violation of these regulations, and may subject the owner, agent or responsible party to all penalties proscribed herein. (Ord. No. 2007-10, § 11, 7-17-2007) Created: 2026-05-07 10:21:27 [EST] (Supp. No. 55) Page 29 of 33 Sec. 26-112. Violations and penalties. (a) Failure obtain or to post addresses. Failure by an owner, agent, or responsible party to obtain an appropriate E-911 address, or to knowingly place an incorrect address in such a manner other than is provided for by this article, shall constitute a violation of this article. The owner, agent, or responsible party shall be deemed guilty of a misdemeanor and, upon conviction, shall be fined not more than $50.00 dollars or imprisoned for a term not to exceed 30 days. Each day that the said violation continues to exist, shall constitute a separate offense. (b) Tampering with street signs, posting illegal street. Removing or defacing a street name sign in any manner, placing a street name sign in any location not approved for such by the county roads department, or being found in possession of a stolen street sign shall constitute a violation of this article. Any person found in violation shall pay all cost associated with the replacement or repair of the signs, and shall be deemed guilty of a misdemeanor and, upon conviction, shall be fined not less than $250.00 dollars per offense or imprisoned for a term not to exceed the authority of the magistrate's courts. (c) Removing or defacing numbers. Any person who unlawfully removes, defaces, marks, changes, destroys or renders an existing posted address number, or road number unreadable in any manner shall be deemed guilty of a misdemeanor and, upon conviction, shall be fined or imprisoned for a term not to exceed the authority of the magistrate's court. (Ord. No. 2007-10, § 12, 7-17-2007) Secs. 26-113—26-150. Reserved. ARTICLE III. A PROGRAM TO DESIGNATE OCONEE COUNTY'S SCENIC HIGHWAYS; ESTABLISHED3 Sec. 26-151. Oconee County scenic highways. Highways located within Oconee County, South Carolina and found to be of special value to the citizens may be designated as scenic highways pursuant to the rules, regulations, and criteria set forth below. (Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025) Sec. 26-152. Definitions. The following words, terms and phrases, when used in this article shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Highway means all those roads, streets and highways within the federal, state or Oconee County highway system. 3Editor's note(s)—Ord. No. 2017-22, § 1(Exh. A), adopted Sept. 19, 2017, amended art. III in its entirety to read as herein set out. Former art. III, §§ 26-151—26-157, pertained to similar subject matter, and derived from Ord. No. 2007-21, §§ I—V, App. A, App. B, adopted Oct. 21, 2008. Created: 2026-05-07 10:21:27 [EST] (Supp. No. 55) Page 30 of 33 Intrinsic qualities means those significant tangible and intangible resources found within a scenic corridor that are known to be distinct within the region. "Intrinsic qualities" include: (1) Scenic: The composition of features that are regionally representative, associative or inspirational. These features are memorable, distinct, visually impressive, and continuous across the view. (2) Historic: Landscapes and structures that educate and stir an appreciation for the legacy of Oconee County's past. (3) Cultural: Activities or objects that represent unique and distinctive expressions of community life, customs or traditional ways and identify a place, region or culture. (4) Recreational: Passive and active leisure activities directly dependent on the scenic qualities of the area and usually associated with outdoor recreation as we seek to refresh and renew our spirits. (5) Natural: Relatively undisturbed and visually pleasing natural areas and/or ecologically sensitive landscapes representing natural occurrences including landforms, water, vegetation and wildlife characteristics. (6) Archaeological: Sites, artifacts or structures recognized by the scientific or academic communities as being representative of past human life and activities. Scenic highway means a highway or segment of a highway receiving a designation as such pursuant to the provisions contained in this article and based on it deserving such recognition due to scenic vistas, cultural or historical significance, or other criteria specified by county council. All scenic highways shall be divided into two route categories: (1) Highways with limited development visible from the highway, yet still retaining special characteristics worthy of preservation, shall be designated a category I scenic highway. (2) Highways with little or no development visible from the highway lying outside primary growth areas, shall be designated a category II scenic highway. (Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025) Sec. 26-153. Designation process. (a) Applications shall be submitted in writing to the planning department by a sponsoring organization (see section 25-154(B)), or by a property owner or group of property owners whose property is contiguous to the proposed scenic highway. Applications shall contain the contact information of person designated by the submitting group as the primary contact for purposes of the designation process and subsequent regulatory and related activities if the proposed highway receives the scenic designation. (b) All persons or entities owning property that is contiguous to the right -of-way of the proposed scenic highway must sign the application for designation as a scenic highway. (c) Upon receipt of an application for the designation of a highway as a scenic highway, the planning director, or their designee, shall forward the application to the staff liaison for the planning commission, who shall then place review of the application on the next appropriate planning commission agenda for consideration. Notice of the date, time, and nature of the planning commission's meeting to consider the application for designation as a scenic highway shall be published in a newspaper of general circulation in the county at least 15 days prior to the meeting. Additionally, signs measuring at least nine square feet and noting that consideration of an application for designation of the subject highway as a scenic highway, and containing contact information for the planning commission's staff liaison, shall be posted at the beginning and end of the proposed scenic highway Created: 2026-05-07 10:21:27 [EST] (Supp. No. 55) Page 31 of 33 and at increments of no less than one mile along the length of the proposed scenic highway. These signs shall remain in place until county council takes final action on the application, as provided for herein. (d) The planning commission shall review applications for compliance with the criteria for des ignating a scenic highway established in this article (see section 26-156, appendix B). Upon completion of the review, the planning commission shall by vote determine a recommendation regarding the designation of the subject highway. The planning commission's recommendation shall be forwarded to county council. In the event county council determines the proposed highway merits designation as a scenic highway, it shall so indicate its decision by ordinance. Prior to enactment of such ordinance, county counci l shall hold a public hearing on the question of the proposed scenic highway designation. Notice of the public hearing shall be published in a newspaper of general circulation in the county at least 15 days prior to the subject meeting, and written notice containing all pertinent information related to the public hearing shall be sent by first class mail to the owner of each parcel that is contiguous to the proposed scenic highway at least 15 days prior to the hearing. For the purposes of this section, the name and address of the owner of the parcel shall be as listed on the tax records maintained by the county tax assessor. (e) Any highway proposed for designation as a scenic highway that is rejected for designation by county council, may not be proposed again for a period of one year from the date of publication of the decision. (Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2019-10, § 1(Exh. A), 3-5-2019; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025) Sec. 26-154. Regulations. (a) It shall be unlawful for any person other than the owner, owner's agent, or other individual with the full knowledge and consent of the owner of a property situated along the right-of-way of a designated and properly identified scenic highway to dig, pull up, gather, remove, cut, maim, break, or injure in any way a public or private property, to include any injury done by fires intentionally set, and to include any injury done to any wild, cultivated, or ornamental plants, shrubs, and trees. These provisions shall not apply where the acts hereby prohibited are done by or under the instructions of county or state authorities lawfully in charge of such public roads, highways or lands, or by a utility in the lawful pursuit of installation or maintenance of their facilities. Violation of this provision of this article shall be punishable by a fine not to exceed $500.00. (b) The sponsoring organization or property owner(s) submitting an application to the county for designation of a highway as a scenic highway shall be responsible for the removal of trash along the portion of the highway so designated as a scenic highway no fewer than three times each year. Permits and/o r required notifications related to any and all activities inside a right-of-way shall be the responsibility of the sponsoring organization or property owner(s). Any individual taking part in trash removal duties, or any other activities related to the standards of this article, shall comply with any and all standards and practices utilized by the entity responsible for maintenance of the highway. (c) A member of the county staff shall be designated by the county administrator to review the status of all county designated scenic highways every two years, or more frequently if deemed necessary by the county administrator or the designated staff member. In the event it is determined that a route fails to meet the criteria established in this article, a report shall be made to the planning commission, which shall notify the sponsoring organization or property owner(s) of the nature of the failure(s) and provide a 45 -day period for corrective action. The planning commission shall thereafter recommend a course of action to county council if necessary. Such recommendations may include, but are not limited to, reclassification to a lower category and/or redesignation. Created: 2026-05-07 10:21:27 [EST] (Supp. No. 55) Page 32 of 33 (d) Regulations contained in this section shall apply equally to both category I and category II s cenic highways; however, category II scenic highways shall receive preference in the pursuit of funding to be utilized in maintaining and enhancing the intrinsic values leading to their designation. (e) A determination of this issue must be made within six months of the county receiving an application. (Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025) Sec. 26-155. Appendix A. A scenic highway corridor management plan shall include the following components: (1) A detailed description of the section of the highway to be designated, including two or more of the intrinsic qualities as defined in this article; a specification as to how the highway in question fits the criteria; an identification of any problem areas that may impact the scenic highway designation. (2) A marked map clearly indicating the section of the highway the applicant is proposing for designation. (3) Photographs or videos of areas which the applicant considers to be of intrinsic value or significance. (4) Letters of support from citizens, businesses, civic groups, and other organizations. (5) A maintenance plan outlining proposed litter collection activities. (6) Any additional proposed actions intended to enhance and maintain the highway if designated a scenic highway. (Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025) Sec. 26-156. Appendix B. Criteria for designating a highway as a scenic highway. (a) The planning commission shall consider the following in determining whether a highway should be designated as a scenic highway. (1) Intrinsic qualities (as defined by this article). (2) Additional amenities and support (such as but not limited to): a. Hospitality features. b. Length of route. c. General support for proposed route. d. Financial commitment. e. Role in regional/statewide strategy. f. Protective easements, zoning overlays, or other land use restrictions. (3) Features negatively impacting the scenic qualities of the highway, (such as but not limited to): a. Junkyards/litter. b. Dilapidated/unattractive structures. c. Excessive advertising. Created: 2026-05-07 10:21:27 [EST] (Supp. No. 55) Page 33 of 33 d. Heavy traffic uses. e. Mining/lumbering scars. f. Heavy industry. g. Parallel and visible utilities along highway. h. Landfills/other pollutants visible from route. (4) Feasibility of maintenance plan and responsibilities. (Ord. No. 2017-22, § 2(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025) - CODE OF ORDINANCES Chapter 32 UNIFIED PERFORMANCE STANDARDS Oconee County, South Carolina, Code of Ordinances Created: 2026-05-07 10:21:31 [EST] (Supp. No. 55) Page 1 of 81 Chapter 32 UNIFIED PERFORMANCE STANDARDS1 ARTICLE I. IN GENERAL Sec. 32-1. Authority of chapter provisions. These performance standards and land development regulations are adopted under authority granted by S.C. Code 1976, § 6-29-310 et seq., otherwise known as the Comprehensive Planning Enabling Act of 1994. (Ord. No. 1999-14, § 1.1, 4-4-2000) Sec. 32-2. Jurisdiction and purpose of chapter. The regulations of this chapter shall apply to new development and to specified uses of land within the unincorporated areas of the county as now or hereafter established, and to municipalities within the county that have adopted the provisions of this chapter and have contracted with the county for the enforcement thereof. The purpose of this chapter is to establish regulations and standards tha t specify a minimum requirement or maximum limit on the impact of certain land uses and development. The standards of this chapter are based upon consideration of the impact upon adjacent land, residents and the general health, safety, and welfare of the county as a whole. (Ord. No. 1999-14, § 1.2, 4-4-2000) Sec. 32-3. Existing regulations and standards; conflicts. This chapter shall complement existing regulations addressing road standards, manufactured housing, and other design and safety regulations until such time as this chapter is amended to include specific provision for those aspects of development and land use. In the case of any conflict between the performance standards set forth herein and any other rules and regulations, the more restrictive shall apply. (Ord. No. 1999-14, § 1.4, 4-4-2000) Sec. 32-4. County planning commission. (a) Authority to establish. The county planning commission (referred to as the "planning commission") is established pursuant to S.C. Code 1976, § 6-29-310 et seq. 1Cross reference(s)—Any ordinance or resolution regarding a comprehensive plan, land use, unified development, zoning or subdivisions saved from repeal, § 1-10(10); buildings and building regulations, ch. 6; environment, ch. 12; floods, ch. 16; planning and development, ch. 24. State law reference(s)—Authority of county to provide for land use regulations, S.C. Code 1976, § 4 -9-30(9); S.C. Government Comprehensive Planning Enabling Act of 1994, S.C. Code 1976, § 6 -29-310 et seq. Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 2 of 81 (b) Functions, powers and duties. It is the function and duty of the county planning commission to undertake a continuing planning program for the physical, social, and economic growth, development, and redevelopment of the county. The plans and programs must be designed to promote public health, safety, morals, convenience, prosperity, or the general welfare as well as the efficiency and economy of the county. Specific planning elements must be based upon careful and comprehensive surveys and studies of existing conditions and probable future development and include recommended means of implementation. The county planning commission may make, publish, and distribute maps, plans, and reports and recommendations relating to the plans and programs and the development of the county to public officials and agencies, public utility companies, civic, educational, professional, and other organizations and citizens. All public officials shall, upon request, furnish to the planning commission, within a reasonable time, such available information as it may require for its work. The planning commission, its members and employees, in the performance of its functions, may enter upon any land with consent of the property owner or after ten days' written notification to the owner of record, make examinations and surveys, and place and maintain necessary monuments and marks on them, provided, however, that the planning commission shall be liable for any injury or damage to property resulting therefrom. In general, the planning commission has the powers as may be necessary to enable it to perform its functions and promote the planning of the county. In the discharge of its responsibilities, the county planning commission has the power and duty to: (1) Prepare and revise periodically plans and programs for the development and redevel opment of the county as provided in S.C. Code 1976, § 6-29-310 et seq.; and (2) Prepare and recommend for adoption to the county council as a means for implementing the plans and programs: a. Performance (performance zoning) standards and zoning ordinanc es to include zoning district maps and appropriate revisions thereof; b. Regulations for the subdivision or development of land and appropriate revisions thereof, and to oversee the administration of the regulations that may be adopted; c. An official map and appropriate revisions on it showing the exact location of existing or proposed public street, highway, and utility rights-of-way, and public building sites, together with regulations to control the erection of buildings or other structures or changes in land use within the rights-of-way, building sites, or open spaces; d. A landscaping ordinance setting forth required planting, tree preservation, and other aesthetic considerations for land and structures; e. A capital improvements program setting forth capital projects (as such term is defined in chapter 2, article IV, division 8, section 2-392 of this Code of Ordinances) required to implement or in conformity with plans which have been prepared and adopted, including an annual listing of priority capital projects for consideration by county council prior to preparation of its capital budget; f. Policies or procedures to facilitate implementation of planning elements; and Appeals regarding alleged errors by the planning director concerning a decision on a land development plan or subdivision may be heard by the planning commission. The planning commission shall act on the appeal within 60 days and the action of the planning commission is final. An appeal from the decision of the planning commission may be taken to circuit court within 30 days after actual notice. (3) Coordinate with, and receive scored proposals for capital projects from, the Oconee County Capital Projects Advisory Committee pursuant to chapter 2, article IV, divi sion 8 of this Code of Ordinances. (c) Membership. Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 3 of 81 (1) The membership of the county planning commission shall be seven in number, selected and appointed by a majority vote of the membership of the county council voting in any meeting of county council, duly assembled, with one member being selected from each of the five county council districts in existence and as delineated at the time of the adoption of this section, nominated by the respective member of county council from each district, together with two members appointed by county council from the county at-large. County council may receive recommendations for the two at-large seats from the county planning commission, the county soil and water conservation district commission, the county school board, and any other interested organization or agency, and county council welcomes any such recommendations; however, county council is not required to wait on such recommendation(s) before county council selects and appoints one or both at -large members, nor is county council obligated to select and appoint any person recommended. Nothwithstanding any other provision hereof, the complete selection and appointing authority for the entire county planning commission, including, without limitation, the at-large members, rests with county council, and the ultimate decision of whom to select and appoint for any of the membership positions is that of county council, by a majority vote of the membership of the county council voting in any meeting of county council, duly assembled, with or without any recommendation. (2) If after an appointment of a member to represent a particular council district of the county to the planning commission, such district is altered, then such commission member shall continue to serve thereon for the remainder of the term to which said member is appointed, regardless of his/her place of residence within the county. (3) In the event the county is further divided into additional county council districts, additional appointments of members to the commission to represent the newly created district(s) may be made by county council through amendment of this section. (4) Should any member of this commission move and establish residence outside of the county or the district where such member was residing at the time of the appointment to this commission, such move shall constitute a resignation by the member, and a replacement member shall be appointed to fill the unexpired term of such resigned member, in the same manner as the original appointmen t. (5) No member of the planning commission may hold an elected public office within the boundaries of the county. (d) Terms of members. (1) The length of the regular term served by each member shall be four (4) years, beginning on January 1 of the year of appointment. (2) For the purposes of implementing the standards of this section, and thereby returning the reappointment/replacement schedule of the membership of the commission to staggered lengths in as fair and equitable manner as possible, the following shall apply: a. All members appointed by county council district shall serve for the same term as the length of the remaining term of the council member who appointed them, after which the term of such district members shall be equal to and coincidental with the term of the council member appointing or reappointing them, with all terms or parts thereof starting as of January 1 of the year of appointment or reappointment. b. The first at-large member appointed by county council after adoption of the restatement of this section shall serve for four years and the second such at -large member shall serve for two years, after which the term of each such at-large member shall be four years following appointment/reappointment, with all terms or parts thereof starting as of January 1 of the year of appointment or reappointment. Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 4 of 81 (3) In the event the regular term of a member in good standing expires prior to reappointment or replacement by county council, said member shall continue to serve until his/her replac ement is appointed and qualified. The date of reappointment or replacement, however, in no way alters the scheduled length of the term. (e) Removal of members. Members of the county planning commission may be removed at any time by a majority vote of the county council, for cause (defined herein as dereliction of duty, as duties are defined herein, conviction of any felony or any crime of moral turpitude, or violation of the South Carolina Ethics Act, all as determined by county council). If, or in the event, any member of the commission shall fail to attend 50 percent or more of the regularly scheduled meetings of the commission within any period of 12 calendar months without excuse of the commission chairman, such member may be replaced without notice by action of the county council. (f) Organization, meetings, procedural rules, records, and purchases. The county planning commission shall organize itself, electing one of its members as chairman and one as vice -chairman, whose terms must each be for one-year. The chairman and vice-chairman shall have the right to vote. The commission shall appoint a secretary, who may be a member or an employee of the county council or of the commission. If the secretary is a member of the commission, he/she shall also have the right to vote. The commission shall meet at the call of the chairman, and at such times as the chairman or commission may determine. Vacancies in such offices by reason of death, resignation or replacement shall be filled for the unexpired term of the officer whose position becomes vacant, in the same manner as the original election or appointment. The commission shall adopt rules of organizational procedure, and maintain a record of its resolutions, findings, determinations, recommendations, and other actions as required by state and federal requirements. Typical operational expenses of the commission shall be provided for in the budget of the planning department; however, the commission may from time to time employ or contract for professional servi ces with funds appropriated by county council. (g) Powers and duties. The county planning commission shall have those powers and duties provided for in Title 6, Chapter 29 of the South Carolina Code of Laws, 1976, as amended, to be exercised with respect to the total unincorporated area of Oconee County, South Carolina, and to include the function to undertake a continuing planning program for the physical, social, and economic growth and development, and redevelopment, throughout its area of responsibility. The commission shall, within the bounds of standards established in state law, draft and periodically review a comprehensive plan for the county, which shall be the basis for a planning process consisting of those elements considered critical, necessary , and desirable to guide the development and redevelopment for the county. It shall also be the duty of the planning commission to provide advice to the county council on any and all matters related to growth and development within the unincorporated areas of the county. (h) Salaries and funding. Each member of the county planning commission shall be paid the sum of $25.00 per meeting of the commission attended, or as county council shall subsequently direct by ordinance or resolution. Additionally, members shall be compensated at the same rate, and in the same manner, as county employees for expenses incurred as a result of attending schools, seminars, meetings, and other normal activities associated with membership, provided said trips and activities are approved in advance by the chairman of county council. (Ord. No. 1999-14, § 1.4, 4-4-2000; Ord. No. 2009-10, § 1, 5-19-2009; Ord. No. 2010-14, §§ 2(Exh. B), 3(Exh. C), 8- 17-2010; Ord. No. 2011-06, § 2, 3-15-2011) Cross reference(s)—Boards, commissions and committees, § 2-241 et seq. Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 5 of 81 Sec. 32-5. Zoning board of appeals. (a) Authority to establish. The county zoning board of appeals shall be established and shall be referred to as "the board," as defined in S.C. Code 1976, § 6-29-780 et seq. (b) Membership. The board shall consist of seven members, a majority of which shall constitute a quorum. Members shall be appointed by the county council, and shall serve overlapping terms of three years, except that original appointees shall serve for staggered terms. Members whose terms have expired shall continue serving until a successor has been appointed by the county council. Members may serve an unlimited number of consecutive terms. A vacancy in membership shall be filled for the unexpired term in the same manner in which the original appointment was made. The county council shall have the authority to remove any member of the board for cause or for violating any of the bylaws, as adopted by the board. The county council shall have the authority to approve a budget for the board and to appropriate funds for the board's activities. Members shall serve without compensation, unless authorized by the county council. No board member shall hold any other public office or position in the county or a municipality in the county. (c) Initial appointments. Upon concluding the appointment of the initial seven members of the board, members shall determine terms through a random drawing, with two members to have a term of one year, two members to have a term of two years, and three members to have a term of three years. (d) Organization. The board shall elect one of its members as chair, who shall serve for one year or until reelected or until a successor is elected and qualified. The board shal l appoint a secretary who may be an employee of the county or who may be a member of the board. The board shall adopt rules of procedures to be contained in bylaws. Meetings shall be held at the call of the chair. Public notice of meetings shall be provided by publication in a newspaper of general circulation in the county. The chair may administer oaths and compel the attendance of witnesses by subpoena. The board shall keep minutes of its proceedings, showing the vote of each question. (e) Public meetings and public records. All meetings of the board shall be open to the public, unless an executive session is declared to receive advice from legal counsel. All meeting minutes shall be public records and shall be available for inspection at the office of the designated administration official during regular office hours of the county government. State law reference(s)—Similar provisions, S.C. Code 1976, §§ 6-29-780, 6-29-790. (f) Powers; variances; special exceptions. (1) The board of appeals has the following powers: a. Appeals: to hear and decide appeals (excepting actions involving the subdivision of land) where it is alleged that there is error in an order, requirement, decision, or determination made by an administrative official in the enforcement of the performance standards ordinance; b. Special exception: to permit uses by special exception subject to the terms and conditions for the uses set forth for such uses in the performance standards ordinance; c. Variance: to hear and decide requests for variance from the requirements of the performance standards ordinance when strict application of the provisions of such ordinance would result in unnecessary hardship. (2) General criteria for granting a special exception. The board shall grant a special exception only if it finds adequate evidence that any proposed development will meet all of the following general requirements as well as any specific requirements and standards listed for the proposed use. The board shall among other things require that any proposed use and location be: Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 6 of 81 a. In accordance with the comprehensive plan and is consistent with the spirit, purposes, and the intent and specific requirements of this chapter; b. In the best interests of the county, the convenience of the community and the public welfare; c. Suitable for the property in question, and designed, constructed, operated, and maintained so as to be in harmony with and appropriate in appearance to the existing or intended character of the general vicinity; d. Suitable in terms of effects on highway traffic, parking and safety with adequate access arrangements to protect streets from undue congestion and hazard; The developer shall have the burden of providing evidence to the county of com pliance with the general requirements of this chapter and the specific requirements of the applicable section. The board may impose whatever reasonable conditions it deems necessary to ensure that any proposed development will secure substantially the objectives in this chapter. (3) General criteria for granting a variance. A variance may be granted in an individual case of unnecessary hardship if the board makes and explains in writing the following findings: a. There are extraordinary and exceptional conditions pertaining to the particular piece of property. b. These conditions do not generally apply to other property in the vicinity. c. Because of these conditions, the application of the ordinance to the particular piece of property would effectively prohibit or unreasonably restrict the utilization of the property. d. The authorization of a variance will not be of substantial detriment to adjacent property or to the public good, and the character of the district will not be harmed by the granting of the variance. 1. The board may not grant a variance, the effect of which would be to allow the establishment of a use not otherwise permitted or to extend physically a nonconforming use of land. The fact that property may be utilized more profitably, shou ld a variance be granted, may not be considered grounds for a variance. 2. In granting a variance, the board may attach to it such conditions regarding the location, character, or other features of the proposed building, structure, or use as the board may consider advisable to protect established property values in the surrounding area, or to promote the public health, safety, or general welfare. (Ord. No. 1999-14, § 1.5, 4-4-2000) Cross reference(s)—Boards, commissions and committees, § 2-241 et seq. State law reference(s)—Similar provisions, S.C. Code 1976, § 6-29-800. Sec. 32-6. Appeals; generally. (a) Time limit for appeals. Appeals to the board may be taken by any person aggrieved or by any officer, department, board, or bureau of the county. The appeal must be taken within a reasonable time, by filing with the planning director and with the board of appeals notice of appeal specifying the grounds of it. The appeals must be taken within 30 days from the date the appealing party has rec eived actual notice of the action from which the appeal is taken. The planning director shall immediately transmit to the board all the papers constituting the record upon which the action appealed from was taken. Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 7 of 81 (b) Appeal stays action. An appeal stays all legal proceedings in furtherance of the action appealed from, unless the officer from whom the appeal is taken certifies to the board, after the notice of appeal has been filed with him, that by reason of facts stated in the certificate a stay would, i n his opinion, cause imminent peril to life and property. In that case, proceedings may not be stayed otherwise than by a restraining order which may be granted by the board or by a court of record on application, on notice to the officer from whom the appeal is taken, and on due cause shown. (c) Hearing; advertisement. The board shall fix a reasonable time for the hearing of the appeal or other matter referred to it, and give at least 15 days' public notice of it in a newspaper of general circulation in t he community, as well as due notice to the parties in interest, and decide the same within a reasonable time. At the hearing, any party may appear in person or by agent or by attorney. (d) Authority to reverse, affirm, modify decisions. In exercising such power, the board of appeals may, in conformity with the provisions of this chapter, reverse or affirm, wholly or in part, or may modify the order, requirements, decision, or determination, and to that end shall have all the powers of the officer from whom the appeal is taken and may issue or direct the issuance of a permit. The board in the execution of the duties specified in this chapter may subpoena witnesses and in case of contempt may certify this fact to the circuit court having jurisdiction. (e) Decisions to be put in writing. All final decisions and orders of the board must be in writing and be permanently filed in the office of the board as a public record. All findings of fact and conclusions of law must be separately stated in final decisions or orders of the board which must be delivered to parties of interest by certified mail. (f) Appeals from decisions of the board. Any person who may have a substantial interest in any decision of the board may appeal from any decision of the board to the circuit court in and for the county by filing with the clerk of court a petition in writing setting forth plainly, fully and distinctly wherein such decision is contrary to law. Such appeal shall be filed within 30 days after the decision of the board is ren dered. (g) Fees may be charged to offset the cost of the appeals process. Reasonable fees may be established by the county council to cover the costs of administering the appeals process. Fees shall be established by resolution by the county council and may be adjusted by subsequent resolution. (Ord. No. 1999-14, § 1.6, 4-4-2000) State law reference(s)—Similar provisions, S.C. Code 1976, §§ 6-29-820, 6-29-830. Sec. 32-7. Administration of the performance standards and land use regulations. The county planning director is designated by the county council as the zoning administrator to administer the performance standards and land development regulations. The county council shall employ such staff as necessary to assist the planning director in his duties. (Ord. No. 1999-14, § 1.7, 4-4-2000) Secs. 32-8—32-40. Reserved. - CODE OF ORDINANCES Chapter 32 - UNIFIED PERFORMANCE STANDARDS ARTICLE II. SEXUALLY ORIENTED BUSINESSES Oconee County, South Carolina, Code of Ordinances Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 8 of 81 ARTICLE II. SEXUALLY ORIENTED BUSINESSES2 Sec. 32-41. Purpose and intent of article. It is the purpose of this article to regulate sexually oriented businesses in order to promote the health, safety, and general welfare of the citizens of the county, and to establish reasonable and uniform regulations to prevent the deleterious locating and concentration of sexually oriented businesses within the county. The provisions of this article have neither the purpose nor effect of imposing a limitation or restriction on the content of any communicative material, including sexually oriented material. Similarl y, it is not the intent or effect of this article to restrict or deny access by adults to sexually oriented materials or expressions that are protected by the First Amendment to the Constitution of the United States of America, or to deny access by the dis tributor and exhibitors of sexually oriented entertainment to their intended market. Neither is it the intent or effect of this article to condone or legitimize any act which is otherwise prohibited and punishable by law. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Sec. 32-42. Findings of fact. (a) There exists potential for the establishment of sexually oriented businesses in the county, and it is in the interest of the public health, safety, and welfare, of the citizens of the county to provide for minimum standards and regulations for sexually oriented businesses, as well as for the health, safety, and general welfare of the owners, operators, employees, and patrons of such bu sinesses. (b) Sexually oriented businesses generate secondary effects which are detrimental to the public health, safety, and welfare. Additionally, sexually oriented businesses are frequently used for unlawful sexual activities, including public sexual indecency, prostitution, and sexual encounters of a casual nature. Such businesses are of particular concern to the community when they are located in close proximity to each other, or close to residences, schools, churches, parks, or playgrounds. (c) The concern over sexually transmitted diseases is an additional legitimate concern for the county, which demands reasonable regulation of sexually oriented businesses in order to protect the health and well being of citizens. (d) Live entertainment at sexually oriented businesses sometimes involves a considerable amount of bodily contact between patrons and seminude or nude employees and dancers, including physical contact such as hugging, kissing, and sexual fondling of employees or patrons. Many sexually ori ented businesses have "couch" or "straddle" dancing, in which employees do such things as sit in a patron's lap, place their sexual organs against a patron while physical contact is maintained, or gyrate in a manner so as to simulate sexual 2Editor's note(s)—Ord. No. 2015-05, § 1(Att. A), adopted Apr. 5, 2016, amended Art. II in its entirety to read as herein set out. Former Art. II, §§ 32-41—32-58, pertained to similar subject matter, and derived from Ord. No. 1999-14, §§ 2.1, 2.2, 2.5—2.11, 2.13—2.25, 2.29, adopted Apr. 4, 2000. Cross reference(s)—Sexually oriented businesses, § 8-31 et seq. State law reference(s)—Massage/Bodywork Practice Act, S.C. Code 1976, § 40-30-10 et seq. Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 9 of 81 intercourse. Such activity can be defined as obscene and illegal in accordance with S.C. Code 1976, § 16 -15- 10 et seq. Such behavior can also lead to prostitution and the spread of sexually transmitted diseases. The planning commission and county council of the county recognizes that the prevention of these and similar activities that pose a threat to the health, safety, and general welfare of the citizens of the county is clearly within the police powers of the county. Further, the planning commission and county council of the county believes that prohibiting contact between performers and patrons at sexually oriented business establishments is a reasonable and effective means of addressing these legitimate governmental interests. Also, the planning commission and county council of the county recognize that regulating the location of sexually oriented businesses is an additional reasonable and effective means of addressing secondary effects associated with these activities. (e) The establishment of a permit process is a legitimate and reasonable means of accountability to ensure that operators of sexually oriented businesses comply with reasonable regulations to facilitate the enforcement of legitimate distancing requirements, and to ensure that operators do not allow thei r establishments to be used as places of illegal activities or solicitation. (f) The location of sexually oriented businesses close to residential areas, schools, churches, parks, or playgrounds leads to the decline in the general welfare of the area, lea ds to conditions that give rise to crime, and places children in a position such that they are endangered by secondary effects of these activities. (g) It is not the intent of this article to suppress speech activities protected by the First Amendment of the Constitution of the United States of America or to place any permissible burden on any constitutionally protected expression or expressive conduct by the enactment of this article. Rather, it is the intent of the county to enact a content neutral regulation that addresses the threats to the public health, safety, and general welfare that are produced by sexually oriented businesses. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Sec. 32-43. Enforcement of article provisions. (a) Penalty; injunction. A person who is found by a court of law to have operated or have caused to be operated a sexually oriented business without a permit or in any other manner that is in violation of this article is subject to suit for injunctive relief as well as prosecution for criminal violations. Such violations shall be punishable in accordance with section 1-7. Each day a person operates or causes to be operated a sexually oriented business in a manner that is in violation of this article shall constitute a s eparate offense. (b) Article regulations in addition to other valid law. The regulations included in this article are in addition to any other valid laws or regulations of the United States of America, the state or the county. Nothing in this article is intended to or shall be interpreted as invalidating any other laws or regulations. Any penalties imposed by a court of law for the violation of this article shall not interfere with any separate criminal prosecution or penalty levied for any other criminal act. (c) Seeking of relief not limited. Nothing in this article is intended to or shall be interpreted as limiting the rights of the county, any citizen, or any entity from seeking any relief from any cause for action as proscribed by state law. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 10 of 81 Sec. 32-44. Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Adult arcade means any place to which the public is permitted or invited wherein coin-operated, slug- operated or electronically, or mechanically-controlled still or motion picture machines, projectors or other image- producing devices are maintained to show images to one or more persons per machine at any one time, and where the images so displayed are distinguished or characterized by the depicting or describing of "specified sexual activities" or "specified anatomical areas." Adult bookstore, adult retail store or adult video store means a commercial establishment which excludes any person by virtue of age from all or part of the premises generally held open to the public where produc ts or equipment distinguished or characterized by a predominant emphasis or simulation of "specified sexual activities" or "specified anatomical areas" are sold, rented, or displayed therein, or which has as one of its principal business purposes, the sale or rental for any form, for consideration, one or more of the following: (1) Books, magazines, periodicals or other printed matter, or photographs, films, motion pictures, videocassettes or video reproductions, slides, or other visual representations whi ch depict or describe "specified sexual activities" or "specified anatomical areas." (2) Instruments, devices, paraphernalia or clothing which are designed for use in connection with "specified sexual activities," excluding condoms and other birth control and disease prevention products. A commercial establishment may have other principal business purposes that do not involve the offering for sale or rental of materials depicting or describing "specified sexual activities" or "specified anatomical areas" and still be categorized as an adult bookstore or adult video store so long as one of its principal business purposes is the offering for sale or rental the specified materials which describe "specified sexual activities or "specified anatomical areas." (3) Adult bookstore, adult retail store, or adult video store does not mean any establishment which displays, rents or sells sexually-explicit materials in an enclosed room equal to less than ten percent of the business' total square footage, and which prohibits anyone under 18 years of age from entering the room. (4) Principal business purpose, as used in this section, means that more than 25 percent of the "stock in trade" of the business is devoted to the display, rent, or sale of items, products, or equi pment distinguished or characterized by a predominant emphasis on, or simulation of, "specified sexual activities" or "specified anatomical areas." (5) Stock in trade for purposes of this subsection shall mean the greater of: a. The retail dollar value of all items, products or equipment readily available for purpose, rental, viewing or use by patrons of the establishment, excluding material located in a ny storeroom or other portion of the premises not regularly open to patrons; or b. The total volume of shelf space and display area. Adult cabaret means a nightclub, bar, restaurant or similar commercial eating or drinking establishment, which regularly features: (1) Persons who appear in a state of nudity. (2) Live performances which are characterized by the exposure of "specified anatomical areas" or by "specified sexual activities." Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 11 of 81 (3) Films, motion pictures, videocassettes, slides or other photographic reproductions which are characterized by the depiction or description of "specified anatomical areas." Adult car wash means a car wash where some or all of the employees are seminude or nude and/or where "specified sexual activities" or "specified anatomical areas" are exhibited. Adult motel means a hotel, motel or similar commercial establishment which: (1) Offers accommodations to the public for any form of consideration; provides patrons with closed circuit television transmissions, films, motion pictures, videocassettes, slides or other photographic reproductions which are characterized by the depiction or description of "specified sexual activities" or "specified anatomical areas," and which may have a sign visible from the public right-of-way which advertises the availability of this type of photographic reproductions; (2) Routinely offers a sleeping room for rent for a period of time that is less than eight hours; (3) Routinely allows a tenant or occupant of a sleeping room to subrent the room for a period of time that is less than eight hours; or (4) Evidence that a sleeping room in hotel, motel, or a similar commercial establishment has been rented and vacated two or more times in a period of time that is less th an eight hours creates a rebuttable presumption that the establishment is an adult motel as that term is defined in this section. Adult motion picture theater means a commercial motion picture theater, one of whose primary business purpose is, for any form of consideration, to regularly show films, motion pictures, videocassettes, slides or similar photographic reproductions which are characterized by the depiction or description of "specified sexual activities" or "specified anatomical areas." Adult theater means a commercial theater, concert hall, auditorium, or similar commercial establishment, one of whose primary business purpose is to regularly feature persons who appear in a state of nudity or which features live performances which are characterized by the exposure of "specified anatomical areas" or by "specified sexual activities." Board means the board of zoning appeals. Certificate of nonconformity means a certificate issued by the planning department to any sexually oriented business which is operating at the time of the enactment of this chapter, and is not in compliance with one of more of its provisions. Dancer means an employee of a sexually oriented business that entertains patrons through expressive forms of dance and/or movement. Designated county employee means the planning director or other employee of the county who is designated by the county administrator for the administration of this article. Employee means an individual working and performing services for any sexually oriented b usiness, including any independent contractor who provides services on behalf of any sexually oriented business to the patrons of such business. Established or establishment means any of the following: (1) The opening or commencement of any sexually oriented business as a new business. (2) The conversion of an existing building or not a sexually oriented business, to a sexually oriented business. (3) The addition of any sexually oriented business to any other existing sexually oriented business. (4) The relocation of any sexually oriented business. Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 12 of 81 Health club means a health club where some or all of the employees are nude or seminude, or in which "specified sexual activities" occur or "specified anatomical areas" are exhibited. Licensee means a person in whose name a sexually oriented business regulatory license to operate a sexually oriented business has been issued, as well as the individual listed as an applicant on the application for a sexually oriented business regulatory license. Live entertainment means a person who appears nude, seminude, or a performance which is characterized by the exposure of "specified anatomical areas" or "specified sexual activities." Nude model studio means any place where a person appears in a state of nudity or dis plays "specified anatomical areas" and is observed, sketched, drawn, painted, sculptured, photographed, or similarly depicted by other persons who pay money or any other form of consideration. Nude, nudity, or state of nudity means: (1) The appearance of a bare human buttock, anus, male genitals, female genitals, or the areola or nipple of the female breast; or (2) A state of dress which fails to cover a human buttock, anus, male genitals, female genitals, pubic region, or areola or nipple of the female breast. Operate or cause to be operated means to cause to function or to put or keep in operation. Operator means any person on the premises of a sexually oriented business who is authorized to exercise overall operational control of the business, or who causes to function or who puts or keeps in operation the business. A person may be found to be operating or causing to operate a sexually oriented business whether or not the person is an owner, part owner, or licensee of the business. Patron means any persons who pays a sexually oriented business any form of consideration for services provided to him by the sexually oriented business. Person means an individual, proprietorship, partnership, corporation, association, or other legal entity. Seminude or seminudity means a state of dress in which clothing covers no more than the genitals of a man, or the pubic region and areola of the breasts of a woman. Sexually oriented business means an adult arcade, adult bookstore, adult retail store or adult video store, adult cabaret, adult motel, adult motion picture theater, adult theater, nude model studio, or any other business such as a car wash or a health club, which offers for consideration, materials, or services characterized as depicting "specified sexual activities" or "specified anatomical areas," or whose employees perform services in a state of nudity or seminudity. Sexually oriented business permit means a special annual operating permit necessary for a sexually oriented business to do business in the unincorporated portions of the county. Such license is in addition to any other regional, state, or county permits. The sexually oriented business regulatory permit also requires the registration of each employee and each employee hired during the operation period authorized by the sexually oriented business regulatory permit. Specified anatomical areas means the male or female genitals including the vulva or more intimate parts of the female genitals, or bare human buttocks, anus, or the areola or nipple of the female breast. Specified sexual activities means any of the following: (1) The fondling or other erotic touching of human genitals, pubic region, buttocks, anus, or female breast. (2) Sex acts, normal or perverted, actual or simulated including intercourse, oral copulation, or sodomy. (3) Masturbation, actual or simulated. Created: 2026-05-07 10:21:28 [EST] (Supp. No. 55) Page 13 of 81 (4) Excretory functions as a part of or in conjunction with any of the activities set forth in subsections (1) — (3) of this section. Substantial enlargement of a sexually oriented business means the increase in floor areas occupied by the business by more than ten percent as the floor areas exist on the date the original certificate of compliance was obtained. Transfer of ownership or control of a sexually oriented business means any of the following: (1) The sale, lease or sublease of the business. (2) The transfer of securities which constitute a controlling interest in the business, whether by sale, exchange, or similar means. (3) The establishment of a trust, gift, or other similar legal device which transfer the ownership or control of the business, except for transfer by bequest or other operation of law upon the death of the person possessing the ownership or control. Viewing room means the room, booth, or area where a patron of a sexually oriented business would ordinarily be positioned while watching a film, videocassette, video reproduction, or live production. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019) Cross reference(s)—Definitions generally, § 1-2. Sec. 32-45. Permitting requirements for the establishment of sexually oriented businesses within the unincorporated areas of the county. (a) Purpose and intent. It is the purpose and intent of this section to establish a permit requirement for sexually oriented businesses that will ensure that these businesses are operated in a manner that is in full compliance with all applicable laws of the United States of America, the state, and the county. The purpose is also to ensure that these businesses are operated in a manner that minimizes adverse impacts on the community and that does not pose a threat to the public health, safety, and general welfare. Further, the pu rpose is to provide the county with a reasonable and legitimate mechanism for enforcing applicable laws. (b) Enabling authority. This section is adopted by the county council in accordance with S.C. Code 1976, § 4 -9-30, as an application of the police powers for the purpose of promoting the public health, safety, and welfare. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Sec. 32-46. Enumeration of permit requirements. (a) Every person or entity engaged or intending to engage in a sexually oriented business, as defined in this article, is required to obtain a sexually oriented business permit (referred to in this article as a permit) from the county before initiating operation of the business. Any person or entity engaging in such business shall have a valid permit in effect at any time in which the business is in operation. (b) Applications for a permit shall be made to the planning director. (c) Any person or entity engaged or intending to engage in a sexually oriented business is required to obtain and hold a valid permit during any period of time in which the business is in operation. (d) An application for a permit shall be made to the planning director on a form provided by the county. If a n entity wishing to operate a sexually oriented business is an individual, that individual must sign the permit . Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 14 of 81 application. If the entity wishing to operate a sexually oriented business is other than an individual, each individual who has at least ten percent ownership in the business must sign the permit application. If a corporation is listed as the owner of a sexually oriented business, then each individual having at least ten percent ownership interest in the corporation must sign the permit applicatio n. Permit applications may be submitted during normal business hours of the county government offices. Permit applications are a matter of public record, and may be viewed by any person during normal business hours of the county government offices. (e) Any applicant for a permit shall be required to provide proof of identification and proof of age. (f) If one person or entity owns or operates more than one sexually oriented business in the county, that person or entity must obtain and hold a separate permit for each sexually oriented business in operation. (g) Any application for a permit must be accompanied by a sketch or diagram showing the configuration of the property and premises, including a statement of total floor space occupied by the business. T he sketch or diagram need not be professionally prepared, but must be drawn to a designated scale or drawn with marked dimensions of the interior of the premises to an accuracy of plus or minus six inches. (h) The fact that a person or entity possesses other types of state or county permits or licenses does not exempt the individual or entity from the permit requirements of this article. (i) The county council shall have the authority to establish reasonable fees for permits and permit applications. Such fees shall be appropriate to cover costs associated with the administration of this article and for the policing of sexually oriented business establishments. Such fees shall be established by resolution by the county council and may be changed by subsequent resolution. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019) Sec. 32-47. Issuance of permit. The planning director shall approve the issuance of a sexually oriented business permit within 30 days aft er receiving an application, unless he finds one or more of the conditions listed as follows to be present: (1) The proposed business is in violation of any portion of this article, including, the section concerning location requirements of sexually oriented businesses. (2) The proposed business is in violation of any article or regulation of the county, any articl e or regulation of any administrative department, bureau, or governmental entity of the state, or any law or regulation of the United States of America. (3) The applicant is under 18 years of age. (4) The applicant has failed to provide information that is reasonably necessary and required on the permit application form for the issuance of a permit, or has falsely answered a question or request for information, as is required on the application form. (5) The premises to be used for the sexually oriented business is found to be unsafe by the county fire marshal, the county building official, or an appropriate official of the State Department of Health and Environmental Control (DHEC). (6) To apply if the applicant is an individual, the applicant, or the s pouse of the applicant is found to be overdue in payment to the county of taxes, fees, fines, of penalties assessed against the individual, or imposed upon the individual in relation to a sexually oriented business. If the applicant is more than one individual or is a corporation, it is found that any person having at least ten percent ownership in the sexually oriented business, any person having at least ten percent ownership interest in a Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 15 of 81 corporation owning the sexually oriented business, or the spouse o f any person having ten percent ownership in the sexually oriented business or corporation owning the sexually oriented business is overdue in payment to the county of taxes, fees, fines, of penalties assessed against the individual, or imposed upon the individual in relation to a sexually oriented business. (7) The permit fee or permit application fee required by this article and adopted by resolution of the county council has not been paid. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019) Sec. 32-48. Administration and display of permits. (a) The permit shall be printed on a form developed by the county. The planning director shall maintain a copy of all permits issued, and shall maintain a record of permit issuances, to include the name of the business, the name of the owner, the date of permit issuance, and the date of permit expiration. (b) Permits and permit records are a matter of public record, and may be reviewed by a ny person during normal business hours of the county government offices, except that records or information pertaining to an ongoing investigation of illegal otherwise noncompliant activity of a sexually oriented business, owner or operator of a sexually oriented business, or employee of a sexually oriented business, may be shielded from public review in accordance with state law. (c) The permit, if granted, shall state on its face the name of the person to whom the permit is issued, the date of issuance, expiration date, and the address of the sexually oriented business. The permit shall be posted at a conspicuous place at or near the entrance of the sexually oriented business so that it may easily be read at any time. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019) Sec. 32-49. Inspection. (a) An applicant or permit holder shall permit representatives of the county sheriff's department, the State Department of Health and Environmental Control, local fire department, the county administrator's office, the county attorney's office, or the county building official's office to inspect the premises of a sexually oriented business for the purpose of ensuring compliance with the law, at any time the building is occupied and open for business. (b) All employees, while on duty at a sexually oriented business, must have a valid driver's license or other government issued official identification with picture in their possession and must present that identification to an inspecting official, as identified in subsection (a) of this section, upon demand. (c) The permit holder (or agent or employee of the permit holder) commits a misdemeanor if it is found by the appropriate court of law that such lawful inspection of the premises is denied for any reason. Such refusal is also grounds for the suspension or revocation of the permit. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Sec. 32-50. Expiration and renewal of permit. All sexually oriented business permits shall be valid for a period of 12 months. Applications for renewal shall be made planning director. An application for renewal shall be made not more than 45 days before the expiration of a valid permit, nor less than 30 days before the expiration of a valid permit. If an application for permit renewal . Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 16 of 81 is not made during this time period, the permit will lapse and an application for a new period shall be required to continue operation of the sexually oriented business. If there is a period in which the existing permit expires before a new permit is issued, the sexually oriented business shall not operate during such period. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019) Sec. 32-51. Suspension of a permit. The planning director shall suspend a sexually oriented business permit for a period not to exceed 30 days, if it is determined that a permit holder or employee of a permit holder commits one or more of the acts listed as follows: (1) Has violated a portion of this article or any other applicable ordinance or regulation of the county, the state, any departments, bureaus, or agencies of the state, or the United States of America. (2) Has refused to allow the inspection of a sexually oriented business, as authorized by this article. (3) Has failed to provide identification, as specified in section 32-49(b). (4) Has failed to register any employee, as specified in this article, or has misrepresented the number of employees of the sexually oriented business. (5) Has allowed any person under 18 years of age to access the premises. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, 6-4-2019) Sec. 32-52. Revocation of a permit. The planning director shall revoke a sexually oriented business permit if a cause for suspension as specified in section 32-51 has occurred at least one time during the preceding 12 months. In addition, planning director shall revoke a sexually oriented business permit if it is determined that any of the acts listed as follows have occurred: (1) The permit holder or an agent of the permit holder has provided false, incomplete, or misleading information in the material submitted during the application process. (2) The permit holder, or an agent or employee of the permit holder operated the sexually oriented business during a period of time in which no valid permit was in existence or the permit was suspended. (3) Any act of obscenity as specified in S.C. Code 1976, § 16-15-305 et seq., has taken place on the premises. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019) Sec. 32-53. Reissuance of a permit. If a permit for a sexually oriented business has been revoked, no new permit for that business shall be issued for a period of 12 months from the date of revocation. This prohibition shall cover any business in the same location, any business owned by the owner of the business for which the permit has been revoked, any business owned by any person having at least ten percent ownership of the business for which the permit was revoked, or any business owned by a corporation of which at least ten percent ownership interest is held by a person with at least ten percent ownership interest in a corporation that owned the business for which the pe rmit was revoked. Such prohibition shall also apply to the spouse of any person meeting the criteria listed above. Any permit holder Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 17 of 81 who has had two permits revoked within a period of 36 months, shall be prohibited from being issued a permit for a period of five years. This regulation shall apply to any individual who shall have at least ten percent interest in the ownership of a subject business or who shall have at least ten percent ownership in a corporation which owned a subject business. This prohibition shall also apply to the spouse of any person meeting the criteria listed above. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Sec. 32-54. Appeals of designation as a sexually oriented business; denial of permit; suspension or revocation of permit. (a) Any aggrieved person or entity may appeal the planning director's designation of a business as a sexually oriented business, the denial of a permit, or the suspension or revocation of a permit to the b oard (as established in section 32-51 and 32-52 of this chapter). Such appeal must be submitted on a form developed by the county and maintained by the planning director. Any appeal must be submitted by certified or registered mail to the county administrator or designated employee within ten business days after notification has been received by the applicant, person, or entity of the decision that is detrimental to the applicant, person, or entity. (b) Reasonable fees may be established by the county council to cover the costs of administering the appeals process. Fees shall be established by resolution by the county council and may be adjusted by subsequent resolution. (c) Before making a determination on an appeal, the board shall conduct a public hearing on the matter. Upon submission of an application for appeal, the chair of the board shall establish the date, time, and location for the public hearing, which shall be within 30 days of the submission of the application for appeal. (d) Notification of the public hearing must be published in a newspaper of general circulation in the county at least 15 days prior to the public hearing. Notice of the public hearing must also be displayed in the office of the planning director. Further, the applicant for the appeal shall be provided notification of the location, date, and time of the public hearing by registered mail with return receipt, or by hand delivery of an agent of the county who is authorized to deliver legal warrants. (e) Any person shall have the right to testify at the public hearing. Any person shall have the right to representation by legal counsel. Any person who does testify shall be required to state their legal name and address. The chair of the board may require the presentation of a v alid driver's license or other official government issued identification with picture to establish the identity of any person wishing to testify. (f) As the appeals process is a quasijudicial function, no member of the board shall accept any evidence pertaining to the issue outside of the hearing context, except that the county employee designated for the administration of this article may prefile a report to the board. Such report, if prefiled shall be distributed to board of zoning appeals members at least seven days prior to the hearing. Such report shall also be provided to the applicant for appeal either by certified mail with return receipt or by an agent of the county who is authorized to serve legal warrants. In either case, such report shall be pro vided to the applicant at least three days prior to the public hearing. Such report shall also be available for public review at the office of the county employee designated for the administration of this article during normal business hours of the county government. In addition, the applicant for appeal may also provide a prefiled report to the board. Such report shall be filed with the employee who is designated to administer this article and must be filed at least seven days prior to the public hearing. Such report shall be distributed to members of the board in an expeditious manner. Further, such report shall be available for public review at the office of the county employee designated for the administration of this article during normal business hours of the county government. If the applicant refuses to sign a certified mail receipt of public hearing notice or of receipt of a Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 18 of 81 prefiled report, or if the applicant cannot reasonably be located at the address provided on the application, the designated county official shall make notice of such event, and it shall not cause the public hearing to be delayed. If any member of the board has reason to believe that he or she has a conflict of interest in voting on the appeal, or if any member has inadvertently received information, evidence, correspondence or testimony regarding the appeal outside of the hearing context, that member shall report the potential conflict, information, evidence, correspondence, or testimony to the county employee designated for the administration of this article. That official shall inform the county attorney of such information. The county attorney shall then provide advice as to whether the board member should participate in the deliberations, participate in the deliberations but make public notification for the record of the information received, or abstain from deliberations. (g) The decision of the board of zoning appeals shall be made solely on findings of fact and shall be based on state law or ordinances of the county. Official action may be taken only if a quorum (as specified in article I of this chapter) is established. Decisions shall be made by a majority vote of board members present and shall be rendered in a written form within five business days of the public hearing, and shall be available for public review at the office of the county employee who is designated to administer this article, the county council shall have no authority to alter a decision of the county board of zoning appeals. Any decision of the board may be appealed to circuit court within ten days after the decision is rendered and made available for public review. (h) If a decision by the designated administrative officer to suspend or revoke a permit is appealed, such decision is stayed from the time the appeal is filed until the board of appeals renders its decision. If the board of zoning appeals upholds the order of the administrative officer, then the period of suspension or revocation shall commence upon the date that the decision of the board is r endered. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019) Sec. 32-55. Transfer of a permit. A permit holder shall not transfer a permit to another sexually oriented business, nor shall a permit holder operate a sexually oriented business under the authority of a sexually oriented business at any location other than the address designated in the permit. Should a sexually oriented permit change ownership, the permit may not be transferred. A new permit may be applied for in accordance with the application procedure included within this article by the new owner. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Sec. 32-56. Permit requirements of businesses operating at the time this article is adopted. (a) Any sexually oriented business that is in operation at the time the ordinance from which this article is enacted shall be permitted to remain in operation without a permit for a period not to ex ceed 120 days. (b) If the owner of the sexually oriented business desires to operate the business for a period exceeding 120 days, the owner shall obtain a permit in the manner proscribed in section 32 -46. In order to ensure that no lapse of time is incurred, a permit application must be submitted within 90 days of the enactment of this article. (c) Any existing sexually oriented business that is nonconforming to the locational requirements as stated in section 32-57(e), may nonetheless be issued a permit in accordance with the nonconforming use provision of this article. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 19 of 81 (d) To provide notification of permit requirements and application procedures, once this article is enacted, the county shall provide advertisement in a newspaper of general circulation in the county. Such advertisement shall be published at least three times at a minimum interval of 14 days. Such advertisement shall include notification of permit requirements, information concerning how a permit application may be obtained, a telephone number and address for obtaining additional information, notification that an existing sexually oriented business may remain in operation without a permit until the designated date that is 120 days subsequent to the enactment of the ordinance from which this article is derived. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Sec. 32-57. Location of sexually oriented businesses. (a) Purpose and intent. It is the purpose and intent of this section to provide for the location of sexually oriente d businesses in a manner that promotes the public health, safety, and welfare of the county, that minimizes secondary impacts associated with these businesses, and that allows for the reasonable establishment of these businesses in accordance with rights as established in the Constitution of the United States of America. (b) Enabling authority. This section is adopted by the county council, upon recommendation from the county planning commission, in conformance with S.C. Code 1976, § 6-29-310 et seq. (c) Consistency with comprehensive plan. This section is adopted by the county council, upon recommendation from the county planning commission, in conformance with the land use element of the county comprehensive plan. Specifically, this article is adopted to accomplish short range goal #4, as identified in the comprehensive plan. (d) Applicability. This section shall apply to the location of any sexually oriented business that is established within the unincorporated area of the county. (e) Locational requirements. No sexually oriented business shall be established, located, or operated on a parcel that is within 1,000 feet of any building or structure utilized for any of the activities listed in this section. Further, no permit shall be granted for a sexually oriented business that is proposed for establishment on a parcel that is within 1,000 feet of any building or structure utilized for any of the activities identified as follows: (1) A church, synagogue, mosque, other place of worship, or facility used for the formal congregation of persons engaged in religious worship activities. (2) A public or private school or nursery school (structure shall include buildings and fenced in play areas). (3) A residence or structure built for residency. (4) A public park, public recreation area, or private recreation area (structure shall include the entire parcel on which the facility is located), or any other sexually oriented business. (5) For the purposes of this section, measurement shall be made in a straight line without regard to intervening structures or objects. Measurement shall be from the nearest portion of the parcel that is proposed for the location of the sexually oriented business to the closest point of any structure identified in this section. No more than one sexually oriented business shall be permitted on any parcel. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016) Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 20 of 81 Sec. 32-58. Sexually oriented businesses, designated as a nonconforming use. (a) Generally. Any sexually oriented business operating on the date that the ordinance from which this article is derived that is found to not be in conformance with the locational requirements, as specified in section 32 - 57(e) shall be designated as a nonconforming use. Such business shall be permitted to remain in operation without a permit during the 120-day period, as specified in section 32-56 and shall be eligible to be issued a permit. Upon issuance of the permit, the planning director, shall make a notation on the permit that the use is designated as nonconforming. (b) Supplemental regulations applied to sexually oriented businesses that are designated as a nonconforming use. (1) No nonconforming use shall be increased, enlarged, extended, or altered. (2) Any sexually oriented business lawfully operating as a conforming use is not rendered a nonconforming use due to the subsequent location of any of the activities listed in section 32 -57(e) within 1,000 feet of the parcel upon which the sexually oriented business is located. If the permit for the sexually oriented business shall lapse or be revoked, or if the business shall cease operation for a period of at least 60 consecutive days, then the business shall be deemed as having bee n terminated. In such case, no new permit shall be issued for any business that is not in compliance with section 32 -57(e). (3) The nonconforming status of any sexually oriented business shall be terminated if the business ceases operation for a period of at least 60 consecutive days, if the business's permit is revoked in accordance with section 32-52, or if the building in which the business is housed suffers damage to an extent in which the cost of repair would exceed 50 percent of the value of the buil ding before it was damaged. (4) Upon the termination of the nonconforming status of the sexually oriented business, the permit shall be permanently revoked. However, unless the revocation is in part or in whole based on one or more of the violations included in section 32-52, the owner shall be eligible to apply for a new permit to reestablish the business or establish a new business without waiting the one -year period, as specified in section 32-53 (c) Issuance of permits. A designated nonconforming use may be issued no more than three annual permits. Upon the termination of the third permit, the nonconforming use must terminate or relocate to a conforming site. (Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019) Secs. 32-59—32-90. Reserved. ARTICLE III. AIRPORT HEIGHT LIMITATION3 Sec. 32-91. Jurisdiction of article provisions. The regulations set forth in this article shall be applicable within the area as shown on the Official Clemson- Oconee County Airport Height Limitation Ordinance Map. The Clemson -Oconee Airport shall be referred to as the 3State law reference(s)—Zoning of land surrounding certain airports, S.C. Code 1976, § 55-9-240. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 21 of 81 "Oconee County Airport." The map may be referred to as the "Clemson -Oconee County Airport Height Limitation Ordinance Map." (Ord. No. 1999-14, § 3.1, 4-4-2000) Sec. 32-92. Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Airport means anyplace where aircraft can land and take off. Airport elevation means the highest point of an airport's usable landing area measured in feet from sea level. Airport height restriction districts mean as set forth in this article. Airport, private, means any privately owned and operated airport. Airport, public, means the county airport. Approach surface means a surface longitudinally centered on the extended runway centerline, extending outward and upward from the end of the primary surface and at the same slope as the airport height restriction districts limitations set forth in section 32-93. Conical district means the district which slopes 20 feet outward for each foot upward beginning at the periphery of the horizontal district and at 150 feet above the airport elevation and extending to a height of 350 feet above the airport elevation, or at a height of 1,242 feet above the mean sea level. Construction means the erection or alteration of any structure either of a permanent or temporary character. Excepted height limitations means that nothing in this article shall be construed as prohibiting the construction or maintenance of any structure, or growth of any tree to a height up to 50 feet above the surface of the land. Height means the overall height of a structure, including any appurtenance there on, and for the purpose of determining the height limitations set forth in section 32-93, the datum shall be mean sea level elevation unless otherwise specified. Horizontal district means a horizontal plane 150 feet above the established airport elevation or at a height of 1,042 feet above the mean sea level, the perimeter of which in plane coincides with the perimeter of the horizontal district. Lot means the least fractional part of subdivided lands, which have been duly recorded, having fixed boundaries, an assigned number, letter, or other name through which it may be identified. Nonconforming use means any structure, growth or use of land which was lawfully in existence prior to the enactment of the regulations of this article and which does not conf orm to this article. Nonprecision instrument runway means a runway having an existing instrument approach procedure utilizing air navigation facilities with only horizontal guidance, or area type navigation equipment, for which a straight -in nonprecision instrument approach procedure has been approved or planned. Obstruction means any structure, growth, or other object, including a mobile object, which exceeds a limiting height set forth in section 32-93. Planning director means the administrative officer or his designee who has been designated by the county council to administer the height ordinance regulations. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 22 of 81 Precision instrument runway. Reserved. Primary surface means a surface longitudinally centered on a runway. When the runway has a specially prepared hard surface, the primary surface extends 200 feet beyond each end of that runway; for military runways or when the runway has no specially prepared hard surface, or planned hard surface, the primary surface ends at each end of that runway. The width of the primary surface is set forth in section 32 -93. The elevation of any point the primary surface is the same as the elevation of the nearest point on the runway centerline. Runway means a defined area on an airport prepared for landing and takeoff of aircraft along its length. Structure means any object constructed or installed by man including, but not limited to, buildings, towers, smokestacks, utility poles, and overhead transmission lines. Transitional surfaces means surfaces extended outward at 90 degree angles to the extended runway centerline. Utility runway means a runway that is constructed for and intended to be used by propeller -driven aircraft of 12,500 pounds maximum gross weight and less. (Ord. No. 1999-14, § 3.2, 4-4-2000) Cross reference(s)—Definitions generally, § 1-2. Sec. 32-93. Height restrictions. (a) Generally. Notwithstanding any other provisions of this article, no structure may be built or vegetation allowed to grow within any district established by this article which in any way endangers or interferes with the landing, takeoff, or maneuvering of aircraft intending to use the airport. The height restrictions for the individual districts shall be those planes delineated as surfaces in part 77.25, subchapter E (airspace), of title 14 of the Code of Federal Regulations, or in successor federal regulations. (b) Airport height restriction districts. In order to carry out the provisions of this article, there are hereby created and established certain districts which include all of the land lying beneath the approach surfaces, transitional surfaces, horizontal surfaces, and conical surfaces as they apply to the county airport. Such districts are shown on the Clemson-Oconee County Airport height limitation map consisting of one sheet, prepared by Talbert & Bright, Inc., and dated March 1994, which, together with all explanatory matter thereon, is by reference made a part of this article. A lot located in more than one of the following di stricts is considered to be only in the district with the more restrictive height limitation. The various height restriction districts are hereby established and defined as follows: (1) Visual approach district (Runway 25). The inner edge of this visual approach district coincides with the width of the primary surface and is 500 feet wide. The approach district expands outward uniformly to a width of 1,500 feet at the horizontal distance of 5,000 feet from the primary surface. Its centerline is the continuation of the centerline of the runway. (2) Nonprecision instrument approach district (Runway 7). The inner edge of this nonprecision instrument approach district coincides with the width of the primary surface and is 500 feet wide. The approach district expands outward uniformly to a width of 3,500 feet at the horizontal distance of 10,000 feet from the primary surface. Its centerline is the continuation of the centerline of the runway. (3) Transitional districts. The transitional districts are the areas beneath the transitional surfaces. (4) Horizontal district. The horizontal district is established by swinging arcs of 10,000 feet radii for all runways designated instruments or visual from the center of each end of the primary surface of each Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 23 of 81 runway and connecting the adjacent arcs by drawing lines tangent to th ose arcs. The horizontal district does not include the approach and transitional districts. (5) Conical district. The conical district is established as the area that commences at the periphery of the horizontal district and extends outward from the horizontal district at the slope of 20 to one for a distance of 4,000 feet. (c) Airport height district restrictions. Except as otherwise provided in this article, no structure shall be erected, altered, or maintained, and no tree or other vegetation shall be allowed to grow in any district created by this article to a height in excess of the applicable height limit established for such district. Such applicable height limitations are hereby established for each of the districts in question as follows: (1) Visual approach district (Runway 25): Slopes 20 feet outward for each foot upward beginning at the end of and at the same elevation as the primary surface and extending to a horizontal distance of 5,000 feet along the extended runway centerline. (2) Nonprecision instrument approach district (Runway 7): Slopes 34 feet outward for each foot upward beginning at the end of and at the same elevation as the primary surface and extending to a horizontal distance of 10,000 feet along the extended runway centerline. (3) Transitional district: Slopes seven feet outward for each foot upward beginning at the sides of and at the same elevation as the primary surface and the approach surface, and extending to a height of 150 feet above the airport elevation, which is 892 feet above mean sea level. In addition to the foregoing, there are established height limits sloping seven feet outward for each foot upward beginning at the sides of and at the same elevation as the approach surface, and extending to where they intersect t he conical surface. (4) Horizontal district: Established at 150 feet above the airport elevation or at a height of 1,042 feet above mean sea level. (5) Conical district: Slopes 20 feet outward for each foot upward beginning at the periphery of the horizontal district and at 150 feet above the airport elevation and extending to a height of 350 feet above the airport elevation, 1,242 feet above mean sea level. (6) Excepted height limitations: Nothing in this article shall be construed as prohibiting the co nstruction or maintenance of any structure, or growth of any tree or other vegetation to a height up to 50 feet above the surface of the land. (7) Private airports are prohibited. (Ord. No. 1999-14, § 3.3, 4-4-2000) Sec. 32-94. Nonconforming situations. (a) Generally. After the effective date of the ordinance from which this article is derived, structures which would be prohibited under this article, structures which would be prohibited under the regulations of this articl e and which were existing prior to the effective date of the ordinance from which this article is derived, shall be considered as nonconforming. It is the intent of this article to permit these nonconformities to continue until they are removed, but not to encourage their continual use. Nonconforming structures may be continued provided they conform to the provisions of this article. (b) Definitions of nonconformity. Unless the context clearly indicates otherwise, the terms defined in this subsection are used in this article in the following manner: . Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 24 of 81 Nonconforming building or structure (dimensional nonconformity) means a nonconforming situation that occurs when the height of a building does not conform to the regulations applicable to the height restriction zone in which the property is located. Nonconforming project means any structure that is incomplete at the effective date of the ordinance from which this article is derived and would be inconsistent with any regulation applicable to the height restriction zone in which it is located if completed as proposed or planned. Nonconforming situation means a situation that occurs when, on the effective date of the ordinance from which this article is derived or any amendment hereto, an existing structure does not conform to one or more of the regulations applicable to the height restriction zone in which the structure is located. (c) Completion of nonconforming projects. The construction or erection of any nonconforming project may be completed, provided that all construction is done pursuant to a validly issued building permit. (d) Extension or enlargement of nonconforming situations. (1) Except as specifically provided in this subsection, it shall be unlawful for any person to engage in any activity that causes an increase in the extent of nonconformity of a nonconforming situation. (2) Physical alteration of structures or the placement of new structures on open land are unlawful if they result in greater nonconformity with respect to height limitations. (3) Minor repairs to and routine maintenance of structures where nonconforming situations exist are permitted and encouraged. (4) A structure that is nonconforming in any respect or a structure th at is used in a nonconforming manner may be reconstructed or replaced if partially or totally destroyed, subject to the following restrictions: a. A letter of intent is received by the planning director within six months from the time of such destruction. b. A building permit is obtained from the planning director within one year from the time the damage or destruction took place. c. The reconstructed building shall eliminate height limitation nonconformities if that can reasonably be accomplished without unduly burdening the reconstruction process or limiting the right to continue the nonconforming use of such building. d. The cost of reconstruction is less than 80 percent of the assessed tax value of the structure. (5) Whenever the planning director determines that a nonconforming structure has been more than 80 percent torn down, or a tree or other vegetation is physically deteriorated or decayed, no permit shall be granted that would allow such structure or tree or other vegetation to exceed the appl icable height limits as specified in section 32-93. (Ord. No. 1999-14, § 3.4, 4-4-2000) Sec. 32-95. Marking and lighting. Notwithstanding the preceding provisions of this article, the owner of any existing nonconforming structure or tree or other vegetation is hereby required to permit the installation, operation, and maintenance thereon of such markers and lights as shall be deemed necessary by the county airport manager to indicate to the operators of aircraft in the vicinity of the airport the presence of such airport obstruction. Such markers and lights shall be installed, operated, and maintained at the expense of the county airport. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 25 of 81 (Ord. No. 1999-14, § 3.5, 4-4-2000) Sec. 32-96. Administration and enforcement; appeal; complaints and remedies. (a) Administration and enforcement. The county council has designated the county planning director or his designee to administer and enforce the provisions of this article. If the planning director shall find that any of the provisions of this article are being violated, the planning director shall notify in writing the person responsible for such violations, indicating the nature of the violation and ordering the action necessary to correct it. He shall order discontinuance of illegal buildings or structures; removal of illegal buildings or structures or of illegal additions, alterations, or structural changes: discontinuance of any illegal work being done; or shall take any other action authorized by this article to ensure complian ce with or to prevent violation of its provisions. (b) Building permits required. No building, mobile home, or other structure shall be erected, located, moved, added to, or structurally altered without a certificate of ordinance compliance therefor issue d by the planning director. No building or other structure permit shall be approved by the planning director except in conformity with the provisions of this article, unless he is so directed by the board as provided by this article. No building permit issued under the provisions of this article for construction in the jurisdictional area of this article shall be considered valid unless approved by the planning director through a certificate of ordinance compliance. (c) Application for building permit. (1) All application for building permits shall be accompanied by sufficient information to allow the planning director to determine conformance with and provide for the enforcement of this article. (2) One copy of the plans and/or other information presented shall be returned to the applicant by the planning director after he shall have marked such copy either as approved or disapproved and attested to the same by his signature on such copy. The original copy of the plans, similarly marked, shall be retained by the planning director. (d) Certificate of ordinance compliance for new, altered, or nonconforming structures. (1) It shall be unlawful to use, occupy, or permit the use or occupancy of any structure, building, or premises, or all or parts thereof hereafter created, erected, changed, converted, or wholly or partly altered or enlarged in its structure until a certificate of ordinance compliance shall have been issued therefor by the planning director stating that the proposed structure, building, or land conforms to the requirements of this article. (2) Failure to obtain a certificate of ordinance compliance shall be a violation of this article, and punishable under this article. (e) Expiration of building permit. If the work described in any building permit has not begun six months from the date of issuance thereof, such permit shall expire; it shall be canceled by the planning director. Permit extensions may be issued by the planning director. (f) Complaints regarding violations and remedies. Whenever a violation of this article occurs, or is alleged to have occurred, any person may file a written complaint. Such complaint, stating fully the causes and basis thereof, shall be filed with the planning director. The planning director shall record properly such complaint, immediately investigate, and take whatever action is necessary to ensure compliance with this article. (g) Remedies. In case any building or structure is proposed to be, or is erected, constructed, reconstructed, altered, maintained; or any land is proposed to be, or is used in violation of this article, the county attorney, or any other person aggrieved, may, in addition to other remedies provided by law, institute an injunction, Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 26 of 81 abatement, or any other appropriate action or proceeding to prevent, enjoin, abate, or remove such unlawful erection, construction, reconstruction, alteration, maintenance, or use. (h) Penalties for violation. Any person violating any provisions of this article shall be guilty of a misdemeanor, and upon conviction shall be imprisoned for a period not to exceed 30 days and/or fined not more than $200.00 for each offense. Each day such violation continues shall c onstitute a separate offense. Nothing contained in this section shall prevent the county from taking such other lawful action as is necessary to prevent or remedy any violation. (Ord. No. 1999-14, § 3.6, 4-4-2000) Cross reference(s)—Administration, ch. 2. Sec. 32-97. Appeals. Appeals from the decision of the planning director and appeals from decisions of the board shall be heard in accordance with article I of this chapter. (Ord. No. 1999-14, § 3.7, 4-4-2000) Sec. 32-98. Amendments. (a) Authority. This article, including the airport height limitation map, may be amended from time to time by the county council as specified in this section, but no amendment shall become effective unless it shall have been proposed by or shall first have been submitted to the planning commission. The planning commission shall have 30 days within which to submit its report. If the planning commission fails to submit a report within the 30-day period, it shall be deemed to have approved the proposed amendment. (b) Requirements for change. When the public necessity, convenience, or general welfare justify such action, and after the required review and report of the planning commission, the county council may undertake the necessary steps to amend the height ordinance. (c) Procedure for amendment. Requests to amend the height ordinance shall be processed in accordance with the following requirements: (1) Initiation of amendments. A proposed amendment to the height ordinance may be initiated by the planning commission or by the owners of the property proposed to be changed; provided, however, that action shall not be initiated for an amendment affecting the same parcel or parcels of property or any part thereof, and requesting the same change in district classification by a property owner of more than once every 12 months. a. Applications for amendments must be submitted, in proper from, at least 20 days prior to a planning commission meeting in order to be heard at that meeting. b. The planning commission, at regular meetings, shall review and prepare a report, including its recommendation for transmittal to the county council. c. All meetings of the planning commission shall be open to the public. At a meeting, any party may appear in person, or by agent, or by attorney. d. No member of the planning commission shall participate in a matter in which he has any pecuniary or special interest. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 27 of 81 e. Following action by the planning commission, all papers and data pertinent to the application shall be transmitted to the county council for final action. (2) Public hearing. Before enacting an amendment to this article, the county council or planning commission shall hold a public hearing thereon; notice of the time and place of which shall be published in a newspaper of general circulation in the county at least 15 days in advance of the scheduled public hearing date. (Ord. No. 1999-14, § 3.8, 4-4-2000) Sec. 32-99. Official Clemson-Oconee County Airport height limitation map amendments. (a) If changes are made in district boundaries or other matter portrayed on the Official Clemson -Oconee County Airport height limitation map, such changes shall be entered on the Official Clemson -Oconee County Airport height limitation map promptly by the planning director within 15 days after the amendment has been approved by the county council. No amendment to this article which involves information portrayed on the Official Clemson-Oconee County Airport height limitation map shall become effective until after such change has been made on such map. (b) No changes of any nature shall be made to the Official Clemson-Oconee County Airport height limitation map or information shown thereon except in conformity with the procedures set forth in this article. Any unauthorized change of whatever kind by any person shall be considered a violation of this article and punishable as provided by law. (c) Regardless of the existence of purported copies of the Official Clemson -Oconee County Airport height limitation map, copies may from time to time be made or published. The Official Clemson -Oconee county Airport height limitation map, which shall be located in the planning director's office, shall be the final authority as to the current status of land and water areas, buildings, and other structures in the county. (Ord. No. 1999-14, § 3.9, 4-4-2000) Secs. 32-100—32-130. Reserved. ARTICLE IV. COMMUNICATION TOWERS4 Sec. 32-131. Authority of article provisions. The authority to regulate communication towers in the county is found in the South Carolina Code of Laws, Title 6, Chapter 29. (Ord. No. 1999-14, § 4.1, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) 4Cross reference(s)—Utilities, ch. 34. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 28 of 81 Sec. 32-132. Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Antenna means a device, dish, or array used to collect or radiate electromagnetic waves for the purpose of transmitting or receiving telecommunications signals. Board means the county zoning board of appeals. Communication tower means a tower, pole, or similar structure that supports or functions as a telecommunications antenna; that is constructed above ground level at a fixed location; that is operated for commercial purposes; and that is either self-supporting, guyed, or mounted on a building or structure. Height (of a communication tower) means the distance from the base of the communication tower, as measured from the average original, unimproved elevation of the finished grade upon which the communication tower is constructed to the highest point of the communication tower. Performance standards means performance zoning as authorized by S.C. Code 1976, § 6-29-720(C) et seq. Stealth tower means a communication tower designed and installed in a manner such that the antenna, supporting apparatus and associated structures are aesthetically and architecturally complim entary and appropriate with regard to an existing structure or immediate environment in which the communication tower is located. Examples include, without limitation, church steeples, bell towers, flagpoles, etc. Telecommunications (as defined in the Federal Telecommunications Act of 1996) means the transmission, between or among points specified by the user, of information of the user's choosing, without change in the form or content of the information as sent and received. (Ord. No. 1999-14, § 4.2, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) Cross reference(s)—Definitions generally, § 1-2. Sec. 32-133. Communications tower and antenna permitted. (a) Determination by planning director or his designated staff representative (co llectively "director"). All applications for tower placement must be submitted to the director for review. Applications must be complete and shall include all of the materials required by this article (application requirements) and must meet all applicable requirements and/or conditions in this article before an application will be processed. Incomplete applications will be returned to the applicant. Under the following circumstances, the director may administratively approve applications for placement of towers and associated antennas: (1) As a communication tower and/or antenna in any district co-located on existing towers or structures. (2) As co-locations on existing electric utility company transmission line towers (such as Duke Power Company towers) which increase the height of the towers by no more than 20 feet. (3) As an individual communication tower and associated antennas that do not exceed 75 feet in total height. Applications approved by the director must comply with all other requirements of this article. The director may refer any application to the board for final review and approval as a special exception. (b) Special exceptions granted by the board. Other than as permitted by section 32-133(a), communication towers are permitted in the county for use only as a special exception. Applications for tower construction Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 29 of 81 are subject to review and approval by the board. Priority in approving additional telecommunications facilities in the county shall be given to co-location on existing towers or structures, including electric utility company transmission line towers. Only when these possibilities have been exhausted or when it can be demonstrated by an applicant that the alternatives are not technically feasible to provide adequate coverage for the county, or when it can be documented by the applicant that the cost of the proposed lease for a site or location is more than 20 percent above the prevailing rate of leases in comparable metropolitan statistical areas (M.S.A.) in the sou theast, shall other sites be considered for approval. Communication towers approved by the board in all districts, as defined in O.C. Code § 38-10.7, shall be encouraged as stealth designs. At the discretion of the board, communication towers may be required to be constructed as a stealth design depending on the impact of the tower on the surrounding area. (c) Appeals to the board. Whenever there is an alleged error by the director in an order, requirement, decision, or determination, an applicant may request a hearing before the board. The board has the authority to correct, reverse, or uphold the decision of the director. (d) Time limit for determination. Failure of the director to act within 45 days from the date of the submission of a properly completed application, unless extended by mutual agreement, may be considered by applicant to be a denial of a permit and may be appealed to the board. (e) Co-locations. Co-locations on existing communication towers or other structures such as existing electric utility company towers which do not increase the height of the existing communication tower or structure are strongly encouraged. Co-locations, construction of freestanding structures (such as monopoles) which are located within the footprint of the existing tower or reconstruction of existing towers, any of which increase the height of the existing tower by more than 20 feet may be approved by special exception if they do not exceed the total tower height permitted in section 32-136. All new towers shall be designed to accommodate the principal provider and at least two additional carriers. At the discretion of the board, new stealth towers shall also be designed to accommodate additional carriers. The county, prior to final approval, must be satisfied that the communication tower makes reasonable accommodations for an additional user. The applicant shall make unused tower space available at fair market value. (Ord. No. 1999-14, § 4.3, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016; Ord. No. 2018-21, § 1(Att. A), 8-21- 2018; Ord. No. 2019-11, § 1, 6-4-2019) Sec. 32-134. General requirements. (a) Illumination. Communication towers shall be illuminated only as required by the Federal Communication Commission (FCC) and/or the Federal Aviation Administration (FAA). (b) Color. Communication towers shall only be painted with a gray, non -reflective paint unless otherwise required by state or federal regulations. (c) Signs. A sign, two square feet in size which includes the names of the companies opera ting the equipment and a phone number for emergencies shall be displayed in a visible location on or near the communication tower. This sign shall be in addition to any signage requirements set by state and federal regulators. No commercial advertising of any type may be attached to a communication tower. (d) Removal. A communication tower which use has been discontinued for a continuous period of one year, shall be removed within 120 days of the date of the end of such period, unless a use agreement is ma intained with the landowner. Companies must notify the county within 30 days if telecommunications cease operations at a tower or antenna. All structures, fencing, screening and other improvements must be removed, and the site must be returned to its original condition at the company's expense. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 30 of 81 (e) Security. For towers greater than 75 feet, self-supporting freestanding communication towers, and associated structures shall be appropriately secured by means of a wall, fence, or other device at least eight feet in height and installed an appropriate distance from the outer edge of the communication tower at all points (collectively "security fencing"). (f) Screening. For towers greater than 75 feet, the purpose of this subsection is to establish control for the visual quality of communication towers from the ground level. A communication tower, as pertains to this subsection, includes the tower, the land, and everything within the required security fencing including any other building and equipment. The screen shall be a minimum depth of ten feet of land surrounding the tower except for one service access. An appropriate plant material screen shall be evergreen plants of a quality and planted in accordance with the standards of the American Nurserymen Association that are indigenous or native to the county area. Such plantings shall be appropriately spaced and of such a size so as to achieve a dense screen with a minimum height of six feet within a three-year period from erection of a tower. Additional screening with deciduous or evergreen trees is desirable and encouraged. Existing trees shall be preserved unless a waiver has been granted by the director to selectively cut specified trees. If in extreme or unusual situations and where it is proven impossible to properly construct the plant material screen, the director may grant permission to construct the security fence as a solid masonry wall, either brick or stucco-type finish, with a minimum height of six feet above ground level and constructed in accordance with applicable construction codes. A certificate of occupancy shall not be issued by the county codes department until the required planting is completed. When the occupancy of a structure is desired prior to the completion of the required planting, a certificate of occupancy may be issued only if the owners or developers provide to the county a form of surety satisfactory to the county attorney and in an amount equal to 125 percent of the costs of the remaining plant materials, related materials, and installation (with the costs agreed to by the director). The form of the surety shall be in conformity with the land development regulations for the county. All required plantings must be installed and approved by the first planting season following issuance of the certificate of occupancy or the bond will be forfeited to the county. The owners and their agents shall be responsible for providing, protecting, and mainta ining all required plant material in healthy condition, replacing unhealthy or dead plants within one year or by the next planting season, whichever comes first. Replacement material shall conform to the original intent of the approved plan. (g) Tower wind load. The communication tower shall be designed to withstand winds in accordance with ANSI/EIA/TIA 222 (latest revision) standards based on the wind load presented by antenna, feedlines, and other associated hardware to be supported by the communication tower. Certification from a structural engineer registered in the state shall constitute proof that such standard has been met. (h) FCC authorization. The owner of the antenna and transmission/reception equipment to be installed on the communication tower shall possess either a valid FCC license/construction permit or a statement establishing FCC compliance for the proposed operation. (i) Design for multiple use. A new communication tower shall be designed to accommodate additional antennae as provided for elsewhere in this article. (j) Safety codes. A communication tower shall comply with all applicable health, nuisance, noise, fire, building, and safety code requirements. (k) Distance between towers. A proposed communication tower in excess of 100 feet shall not be permitted within 1,300 feet of an existing communication tower in excess of 100 feet in height, unless the applicant certifies to the board that the existing communication tower does not meet applicant's structural specifications and applicant's technical design requirements, or that a co-location agreement could not be obtained. (l) Application of county land use regulations. Land development regulations and other performance standards shall apply to the use, unless otherwise provided in this article. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 31 of 81 (m) Minimum setbacks. A communication tower (not including guy anchors) over 75 feet must be, at a minimum, setback as follows: (1) A distance equal to the total height of the communication tower from all property lot lines. (2) A distance equal to the total height of the communication tower from the nearest point of any structure meeting minimum standards for human occupation as put forth in applicable building codes adopted by the county. (3) A distance equal to the total height of the communication tower from any properties containing churches, schools, colleges, children's homes and shelters, hospitals and nursing homes; except that communication towers which meet the definition of stealth tower in section 32 -132 may be permitted by special exception on these properties. (4) A distance equal to the total height of the communication tower from the right -of-way of all streets and roads. (5) A communication tower may not be sited (1) within a distance equal to 250 feet of the boundary of a historic district; (2) on or within 250 feet of a structure that is a designated a National Historic Landmark or that is listed in, or eligible for listing in, the National Register of Historic Places; or (3) on or within property that is the subject of a pending complaint alleging an adverse effect on a historic property. All guy cables and anchors must be set back at a minimum of 20 feet from all lot lines and habitable structures. Variances may be granted from the requirements of subsections (1) and (2) upon submission of a properly prepared engineered fall zone design/construction document(s). (Ord. No. 2001-14, § 1, 7-10-2001; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) Sec. 32-135. Additional requirements for location near the county airport. (a) With the exception of towers for aeronautical purposes, in no case may a communication tower penetrate any imaginary surface, as described in chapter 14 of the Code of Federal Regulations, Federal Aviation Regulation (FAR) Part 77, associated with existing or proposed runways at any publicly owned airport. All communications towers located within the first 12,000 feet of the approach surface of an existing or proposed runway at such facility, or within the horizontal surface associated with suc h runways as described in FAR Part 77, shall be lighted. Such towers shall be illuminated by strobe lights during daylight and twilight hours, and red lights during nighttime hours. (b) A copy of any plans whereby a communication tower will be located within such 12,000 feet area shall be provided by the applicant to the county airport manager and the director for comment. Any comments shall be made within ten days of delivery to such manager with a copy to the director and the applicant. Prior to issuance of a building permit, the applicant shall provide documentation to the director that the proposed communication tower has been reviewed by the Federal Aviation Administration (FAA), if so required, and that a finding of no hazard to air navigation has been determined. (Ord. No. 1999-14, § 4.5, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) Sec. 32-136. Maximum height of freestanding communication towers. The maximum height of freestanding communication towers shall be as follows: Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 32 of 81 District1 Maximum Height Residential Not exceeding 175 feet Commercial Not exceeding 200 feet Industrial/agricultural Not exceeding 250 feet 1 See section 38-10. (Ord. No. 1999-14, § 4.6, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) Sec. 32-137. Permitted height of building-mounted communication towers. A communication tower shall not exceed 20 feet in height, as measu red from the base of the communication tower to the highest point of the communication tower, if mounted on a building or any structure other than a freestanding or guyed communications tower. (Ord. No. 1999-14, § 4.7, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) Sec. 32-138. Application requirements. The following information shall be submitted for all applications for approval of a communication tower: (a) Structural specifications. Two copies of the specifications for proposed structure, including description of design characteristics and material. (b) Technical specifications. For each antenna to be installed: (1) Manufacturer and model number. (2) Frequency band used for transmitting and receiving. (3) Effective radiating power. (4) Mounting position above ground. (5) A study demonstrating compliance with FCC RF exposure limits (all antennas). (c) Site plan. Two copies of a site plan drawn to scale showing property boundaries, communication tower location, communication tower height, guy wires and anchors, security fen cing, screening, existing structures, photographs or elevation drawings depicting typical design of proposed structures, parking, fences, landscape plan, and existing land uses on adjacent property. A site plan is not required if antenna is to be mounted on an approved existing structure. Prototypical drawings indicating various types of equipment to be located on the communication tower may be submitted at the time of the permit application. Identification of the owners of all antennae and equipment to be located on the site. Other equipment may be added to the communication tower without additional permits or inspections as long as electrical wiring is not required. (d) Location map. Two copies of a current map, or update for an existing map on file, show ing geographic coordinates of the communication tower, calculated coverage areas, facilities, location of existing nearby (within three miles) communication towers, and proposed communication towers, serving contiguous areas. An applicant may request that specific proprietary or confidential information be withheld from the public record. (e) Owner authorization. Written authorization from the site owner for the application. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 33 of 81 (f) Visual impact analysis. A line of sight analysis showing the potential visual and aesthetic impact on adjacent residential districts. For communication tower applications, balloon testing and computer generated viewshed analysis/rendering to provide a visual representation of the proposed structure on the proposed site, shall be provided as part of the application package by the applicant. (g) Alternative to co-location or stealth design. Co-located or stealth designs shall be required unless satisfactory documented evidence can be provided indicating that: (1) The proposed antenna and equipment cannot be accommodated and function as required; (2) The applicant's technical design requirements are such that without unreasonable modifications they cannot function on any existing structure or communication tower under the control of applicant; and (3) The applicant has considered all available publicly-owned sites, and available privately owned sites occupied by a compatible use, including all applicable sites or locations or a combination of sites and locations as described under section 32-133(b) for priority of approval and the applicant has demonstrated that for the reasons described in section 32-133(b) that these sites and/or locations are unsuitable for operation of the facility under applicable state and federal communications regulations, the applicant's technical design requirements and/or valid economic reasons. (h) Indemnity. The applicant must show by certificate from a registered engineer that the proposed facility will contain only equipment meeting FCC rules, and must file with the director a written indemnification agreement, on a form approved by the county. The applicant must also file with the county proof of liability insurance or financial ability to respond to claims up to $1,000,000.00 in the aggregate which may arise from operation of the facility during its life, at no cost to the county, in a form approved by the county attorney. (i) Application fees. All communication tower applications shall include a check made out to the county treasurer in an amount to be determined by the director, based upon a schedule of fees enacted by the county council. Additional fees may be imposed in order to offset the costs associated with processing applications for special exceptions, appeals, or variances. (Ord. No. 1999-14, § 4.8, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016; Ord. No. 2018-20, § 1(Att. A), 8-21- 2018) Sec. 32-139. Special exceptions, variances and appeals. (a) Special exception. Unless indicated otherwise, communications towers are permitted in the county only by special exception, approved by the board, within the criteria of the performance standards ordinance. The board shall conduct a public hearing on each request for a spec ial exception. All public hearings shall be advertised in a newspaper of general circulation in the county at least 15 days in advance of the hearing. (b) Variance. An applicant may submit a request to the board for a variance from this or any other appli cable land use ordinance. The board shall hear and decide appeals for a variance from the requirements of the performance standards ordinance when strict application of the provisions of the article would result in unnecessary hardship. A variance may be granted in an individual case of unnecessary hardship if the board makes and explains in writing a unique, exceptional and otherwise unusual circumstance as provided for in general criteria for granting a variance in article I of this chapter. Special excep tions and variances, may be applied for simultaneously and considered by the board simultaneously. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 34 of 81 (c) Appeals. Applications for appeal shall be submitted through the director to the board. All appeals shall be accompanied by copies of the original application, supporting maps and documentation and shall include a detailed written summary of the alleged error or misinterpretation of this article by the director in not granting approval to the original application. A copy shall be provided for each board me mber and the director, and other copies as may be required by the director. Appeals shall be heard by the board within 45 days of submission of the completed application to the director. (Ord. No. 1999-14, § 4.9, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) Sec. 32-140. Additional criteria for evaluating special exceptions and variances. (a) Application; conditions. All application requirements imposed by section 32-138 must be met. (b) Setback requirements; additional conditions. The applicant must demonstrate that the proposed communication tower location is sufficient to satisfy setback requirements and must satisfy such other additional conditions, if any, necessary to remove dangers to safety and to protect adjacent property. (c) Residential service area. If location in a residential district, as defined in section 38-10.7 has been requested, the applicant must show that the area cannot be adequately served by a facility placed in a nonresi dential district for valid technical reasons. (d) Greenspaces. If location in a residential district has been requested, the tower shall n ot be located on land designated for public recreational uses on the county land use plan. (e) Priority of approval. If a location is requested which does not meet the requirements under section 32 -133(b) for priority of approval the applicant must demonstrate that all alternative sites and locations or combinations thereof provided for in section 32-133(b) have been considered by the applicant, and the applicant has demonstrated that for the reasons described these sites and/or locations or combinations thereof cannot adequately serve the area for valid technical or economic reasons and are unsuitable for operation of the facility under applicable communications regulations. (f) Denial on substantial evidence. The Federal Telecommunications Act of 1996 requires that a denial of a permit be supported by substantial evidence. The board shall maintain a written record of all appeal proceedings and shall maintain supporting documentation for any and all decisions. (Ord. No. 1999-14, § 4.10, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) Sec. 32-141. Annual report required. All companies that operate or maintain ownership of communication towers in the county shall submit an annual report to the county planning department no later than January 15 of each year. The report shall include a description of all of the company's active and inactive facilities located in the county, co -locations of its own equipment, co-locations of other companies using its facilities, and shall include telephone numbers and addresses for company officials and maintenance personnel. (Ord. No. 1999-14, § 4.11, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016; Ord. No. 2019-11, § 1, 6-4-2019) Sec. 32-142. Technical assistance required. The director (prior to issuing a permit) and the board (prior to issuing a permit by special exception or deciding an appeal or request for variance) may make use of technical consultants to review applications and to determine if the standards in this article are met. The permit applicant shall be required to bear the cost of the Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 35 of 81 required technical services. The director shall estimate any expenses and shall require payment with the completed application. Additional expenses shall be invoiced by the county finance department to the applicant. Amounts in excess of required fees and actual expenses shall be returned to the applicant. (Ord. No. 1999-14, § 4.12, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016) Secs. 32-143—32-170. Reserved. ARTICLE V. GROUP RESIDENTIAL DEVELOPMENTS5 Sec. 32-171. Authority of article provisions. The regulations of this article are enacted pursuant to S.C. Code 1976, § 6 -29-310, et seq. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-172. Purpose of article. The regulations of this article are intended to lessen the adverse impact of large -scale group residential development on neighboring residential areas and to ensure the health, safety and general welfare of residents and citizens of the county. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-173. Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Board means the board of zoning appeals (BZA), as defined in section 32 -5. Exempted residential facility means recreational summer camps, day facilities, and religious retreat facilities, any of which do not provide for long-term stays of 30 days or more. Hospitals and nursing homes are exempted from the requirements of this article. Group residential facility means a public, private, or not-for-profit facility, which (i) provides a community living environment for individuals, whether or not disabled under applicable law, requiring custodial care, medical or therapeutic treatment, or specialized social services and (ii) houses ten or more persons not related by blood, marriage, or adoption in a residential or dormitory environment for a period of 30 days or more per year. Residential treatment centers (RTCs) are included in this definition. Proposed group residential facilities must show compliance with all applicable requirements of the State of South Carolina. 5Editor's note(s)—Exh. A of Ord. No. 2022-09, adopted April 19, 2022, revised, rewrote, and amended art. V to read as herein set out. Former art. V pertained to the same subject matter, and derived from Ord. No. 2016- 06, adopted April 5, 2016; and Ord. No. 2019-11, adopted June 4, 2019. State law reference(s)—Government entities subject to zoning ordinances; exceptions, S.C. Code 1976, § 6 -29-770. Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 36 of 81 (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-174. Group residential facilities permitted by special exception. Persons desiring to build or expand a group residential facility as defined by this article shall make an application through the planning director, or designee, to the board providing information required by this article. Development or expansion of a group residential facility may commence only with the approval of the board as a special exception after a public hearing in accordance with section 32-5. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-175. Review of application by planning director, or designee. All applications for development or expansion of residential group facilities must be submitted to the county planning director, or designee for review. Applications must be complete and shall include all of the materials and information required by this article (application requirements and sketch plan and preliminary development plans) and must meet all applicable requirements and/or conditions in this article before an application will be processed. Incomplete applications will be returned to the applicant. The planning director, or designee shall refer completed applications to the board for final review and approval as a special exception. The planning director, or designee shall act upon applications within 30 days of receipt, returning them for cause, or forwarding them to the board for further action. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-176. Public hearing and approval by the board. The board shall conduct a public hearing and shall review applications for compliance with the provisions of this article, in particular with section 32-180, board criteria for granting a special exception and general criteria for special exceptions in article I of this chapter. Development or expansion may proceed only as approved by the board. Any changes in development or expansion plans as approved by the board shall require a new application. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-177. Appeals. Whenever there is an alleged error by the planning director, or designee in an order, requirement, decision, or determination, an applicant may request a hearing before the board in accordance with the provisions of section 32-5. Appeals of the decisions of the board may be made to the county circuit court in accordance with the provisions of section 32-5. Appeal hearings shall be advertised and reasonable fees may be charged in accordance with article I of this chapter. Appeals of the decisions of county council may be made to the county circuit court in accordance with the South Carolina Code of Laws. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-178. Application requirements. Applications for development or expansion of group residential facilities must include the following: (1) A complete description of the name and purpose of the proposed facility; Created: 2026-05-07 10:21:29 [EST] (Supp. No. 55) Page 37 of 81 (2) A complete list of the names, addresses, and phone numbers of board mem bers, owners and investors, as applicable; (3) A copy of a license or application for a license to the state department of social services to operate a group facility; (4) State tax identification number or tax exemption certification; and (5) Two copies of a preliminary development plans and a sketch plan displaying the physical and relative layout of the facility as outlined by section 32-179. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-179. Sketch plan and preliminary development plans. A sketch and development plan will be required for all proposed group residential developments. The sketch plan shall be drawn at an approximate scale of not less than a scale of 200 feet to one inch and shall include a vicinity map showing the relationship of the proposed development to the surrounding areas. The planning director, or designee may waive some of the following sketch plan elements on applications for minor modifications and additions to existing facilities; otherwise, all sketch plan submittals shall include the following in sketch and narrative form: (1) An accounting of total acreage in the tract and any proposed subdivision of parcels; (2) Arrangement, shape, dimensions, and area of proposed development; (3) Location of existing property lines, easements, road rights-of-way, buildings, or other public ways adjoining the tract to be developed; (4) Alignment, right-of-way width, and clarification of proposed roads; (5) Topography by contour at intervals of not more than ten feet (as from USGS quad sheets); (6) Map scale, north arrow, and date; (7) Name/address/telephone number of legal owner or agent and the professional (surveyor or engineer) who will undertake detailed layout and improvements design; (8) Location of watercourses and land subject to flooding based on a 100 -year frequency flood; (9) The existing and proposed uses of land throughout the development; (10) Proposed method of water supply and wastewater treatment and other utility services; (11) The proposed name of the development; (12) The owner/developer shall submit a sketch plan of this entire tract even though the subdivider's present plans call for the actual development of only a part of the property. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-180. Board criteria for granting a special exception. The board criteria for granting a special exception shall be as follows: (1) Traffic flow from the facility shall not present a danger to local residents, motorists and pedestrians. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 38 of 81 (2) Noise, lighting, and activities carried out on the premises of the facility shall not present a nuisance to local residents. (3) The residents of the facility shall not present any potential danger to local residents. (4) The residents of the facility shall reside in a safe and healthy environment. (5) The proposed development is in compliance with the other provisions of this chapter. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-181. Reasonable accommodation requests. Oconee County Council is authorized to grant reasonable accommodations under the Federal Fair Housing Act, the Americans with Disabilities Act of 1990, the Rehabilitation Act of 1973, and the South Carolina Fair Housing Law, as amended, under the circumstances set forth in this section. Any person who requires a reasonable accommodation, because of a disability, in the application of a land use or zoning law, rule, policy, or practice that may be acting as a barrier to equal opportunity to housing opportunities, or any person or persons acting on behalf of or for the benefit of such a person, may request such accommodation. An application for a reasonable accommodation, which shall be in writing on a form prescribed by the county and available from the county planning department, shall be filed with the county administrator and the county planning director. At a minimum, the application shall contain: (1) The applicant's contact information (name, mailing address, telephone number, fax number, and email address); (2) The contact information for the owner(s) of the property (if different from the applicant); (3) The address of the property at which the reasonable accommodation is requested; (4) A full description of the reasonable accommodation requested; (5) A detailed statement explaining how and why the request meets the standards for a reasonable accommodation as set forth in this section; (6) The notarized signature of the applicant and property owner(s) (if different from the applicant); and (7) The information required under sections 32-178 and 32-179 of this article, provided the requirement of submitting such information is not the subject of the reasonable accommodation request. No filing fee shall be required for the application. County council shall consider the proposed reasonable accommodation and shall decide the request upon a majority vote of the members present. County council shall grant a reasonable accommodation in relation to any provision of this article and related law, if county council finds that the applicant has demonstrated, by the greater weight of the evidence, that the proposed reasonable accommodation is both reasonable and necessary, in accordance with applicable law and the following: (1) "Reasonable": an accommodation will be determined to be reasonable if it would not undermine the legitimate purposes and effects of existing land use or zoning regulations, and if it will not impose significant financial and administrative burdens upon the county and/or constitute a substantial or fundamental alteration of the county's zoning or land use ordinance provisions; and Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 39 of 81 (2) "Necessary": an accommodation will be determined to be necessary if it would provide direct or meaningful amelioration of the effects of the particular disability or h andicap and would afford disabled or handicapped persons equal opportunity to enjoy and use a dwelling, including public and common spaces, in the county. After county council has approved a reasonable accommodation request, the applicant shall follow all applicable land use ordinances, procedures, and regulations for the approval of any permits, certificates, or other approvals required in order to proceed with development or use of the property. All orders, decisions, determinations, and interpretations made by administrative officers under those procedures shall be consistent with the reasonable accommodations granted by county council. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Sec. 32-182. Building permits and certificate of occupancy. Building permits and certificate of occupancy shall not be issued until or unless authorized by the planning director, or designee and the proposed development is in compliance with the requirements of this article and the standard building codes as adopted by the county. (Ord. No. 2022-09, § 1(Exh. A), 4-19-2022) Secs. 32-183—32-210. Reserved. ARTICLE VI. LAND DEVELOPMENT AND SUBDIVISION REGULATIONS6 Sec. 32-211. General provisions. (a) Short title. This article shall be known and cited as the "Oconee County Land Development and Subdivision Regulations Ordinance." (b) Authority. These land development and subdivision regulations are adopted under authority granted by S.C. Code 1976, tit. VI, ch. 29, § 6-29-1120 et seq. (c) Jurisdiction. These regulations shall apply to the development and subdivision of land within the unincorporated areas of the county as now or hereafter established and any incorporated municipality which contracts with the county for these regulations to be administered within such municipality. Regulations contained within this article that apply to the construction and maintenance of roads shall apply to all roads and drainage structures, whether public or private, constructed within any unincorporated area of the county and municipalities contracted with the county for administration of these regulations. Regulations 6Editor's note(s)—Ord. No. 2008-20, adopted Dec. 16, 2008, repealed Ch. 32, Art. VI, Div. 1, §§ 32-211—32-234 and Div. 2, §§ 32-311—32-316, in its entirety. Arts. 1—16 of said ordinance enacted new provisions to read as herein set out. Prior to amendment, Art. VI pertained to subdivisions and land developm ent and derived from Ord. No. 2002-05, §§ 6.1.1, 6.1.2, 6.2.1, 6.3—6.23, adopted May 7, 2002; Ord. No. 2004-14, adopted Jun. 15, 2004; Ord. No. 2006-07, §§ 7.1—7.4, adopted May 1, 2006 and Ord. No. 2006-20, §§ 1(6.3), 2(6.3), 3(6.5(6.5.13), 4(6.7(6.7.14), adopted Aug. 15, 2006 and Ord. No. 2008-19, adopted Dec. 16, 2008. State law reference(s)—Authority to regulate subdivisions and land development, S.C. Code 1976, § 6 -29-1110 et seq. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 40 of 81 contained within this article that apply to the construction and maintenance of roads, appurtenances or drainage structures shall apply to all public and private roads, drives and driveways in the unincorporated areas of the county; also included shall be all municipalities contracted with the county to administer these regulations. These regulations shall not apply to those roads completed, under constru ction, or approved (accepted) by the county prior to adoption of this article by county council. In the event that a regulation in this article conflicts with any other county regulation, the more stringent standard shall apply. (d) Purpose. The purpose of this article is to protect and promote the public health, safety and general welfare of the citizens of the county, South Carolina, providing for the harmonious, progressive, and orderly development of land. These regulations are established for the following specific purposes, among others, as provided for in the South Carolina Local Government Comprehensive Planning Enabling Act of 1994 (S.C. Code 1976, § 6-29-1120, et seq.): (1) To encourage the development of an economically sound and stable county; (2) To assure the timely provision of required streets, utilities, and other facilities and services to new land developments; (3) To assure the adequate provision of safe and convenient traffic access and circulation, both vehicular and pedestrian, in and through new land developments; (4) To assure the provision of needed public open spaces and building sites in new land developments through the dedication or reservation of land for recreational, educational, transportation, and other public purposes; and (5) To assure, in general, the wise and timely development of new areas, and redevelopment of previously developed areas in harmony with the county's comprehensive plan. (Ord. No. 2008-20, Art. 1(1.1—1.4), 12-16-2008) Sec. 32-212. Definitions. When used in this article, the following words and terms shall have the meaning indicated. Words and terms not herein defined shall have their customary dictionary definitions. The term "shall" is mandatory. When not inconsistent with the content, words used in the singular number include the plural and those used in the plural number include the singular. Affordable housing means a housing unit for which the total annual cost of a sale (including mortgage, amortization, taxes, insurance, and condominium and association fees) constitutes no more than 28 percent of the annual household income for a household earning no more th an 80 percent of the area's median income, by household size, as reported by U.S. Housing and Urban Development (HUD); or for a rental housing unit, the total annual cost for rent and utilities can constitute no more than 30 percent of the annual household income for a household earning no more than 80 percent of the area median income, by household size, as reported by HUD. Apartment complex means a building or portion thereof, other than a hotel, divided into more than two dwelling units which are arranged in such a manner as to be used for lodging by separate households. Applicant means the developer or agent of the developer who applies for a subdivision review and is designated as the primary contact for said subdivision. Average daily traffic means the number of trips made by vehicles that will be utilizing a road, intersection or other reference point in a 24-hour period. Block means a parcel of land entirely surrounded by roads or highways, railroad rights -of-way, waterway, or combination thereof. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 41 of 81 Building footprint means the area included within surrounding exterior walls, or exterior walls and fire walls, exclusive of courts. Building line (also referred to as "building setback line") means a line beyond which no part of the structure of any building shall project, unless specifically permitted in this Code of Ordinances, with the exception of subsurface projection of footings, measured perpendicular to the property line. This includes , but is not limited to, the building, eaves, porches, decks, chimneys, bay windows, and fire escapes. Building permit means a document or certificate issued by the county authorizing construction, enlargement, alteration, moving of, or demolition of a building or structure, or the placement of a mobile home (manufactured housing). Cleared or grubbed areas means the area within the road right-of-way that is cleared of vegetation. Comprehensive plan means any legally adopted part or element of the Comprehensive Plan of Oconee County, South Carolina. This plan may include, but is not limited to, the community facilities, population, economic development, land use, natural resources, and housing elements. Condominium complex means a building or group of buildings containing dwelling units which are individually owned. The structure, common areas, and other facilities are owned by the developer and/or the owners of the individual units on a proportional or individual basis. Crosswalk means an area with a width of ten or more feet dedicated for public use, and intended for pedestrian access to adjacent land area. Cul-de-sac means a local road (minor) with one end open to traffic and the other end terminated with a planned vehicular turnaround. Density means the number of dwelling units or lots per acre of land developed or used for residential purposes. (1) Low density: Two or less dwelling units per acre. (2) Medium density: From 2.1 to 6.0 dwelling units per acre. (3) High density: Over six dwelling units per acre. Developer means an individual, partnership or corporation (or agent therefore) that undertakes the activities covered by these regulations. Development means any manmade change to improved or unimproved real estate including, but not limited to: new homes, building structures, dredging, filling, grading, paving, or excavation operations. DHEC means the South Carolina Department of Health and Environmental Control. Dwelling means a building or portion of a building arranged and/or designed to provide living quarters for one or more families where each dwelling is provided with separate kitchen and bathroom facilities. (1) Single-family dwelling means a detached dwelling designed for or occupied exclusively by one family on a single lot. (2) Duplex means a building arranged or designed to be occupied by two families living independently of each other on a single lot. (3) Group dwelling means a group of two or more principal structures built on a single lot, parcel or tract of land and designed for occupancy by separate families. (4) Multiple-family dwelling means a building or series of buildings on the same parent parcel used or designed as a dwelling place for three or more families living independently of each other, with the number of families in residence not exceeding the number of dwelling units provided. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 42 of 81 Dwelling unit means one or more rooms connected together and constituting a separate, independent housekeeping establishment, with provisions for cooking, eating and sleeping, and phy sically set apart from any other rooms or dwelling units in the same structure. Easement means a grant of one or more specific property rights by the property owner permitting a specific use or uses to the public, a corporation, or another person or entit y. Easement, private roadway means an easement that grants access for all utility and roadway construction and maintenance. Flag lot means a lot shaped like a flag on a pole. The "flag" shaped area is situated behind another lot and is the portion of a flag lot where structures may be located. The "pole" shaped area is the portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See chapter 38 for specific provisions addressing flag lots.) Flood means a temporary overflowing of water onto land that is usually devoid of surface water. Floodplain means land areas adjoining a river, stream or watercourse which are subject to a one percent or greater chance of flooding in any given year. These areas are specifically established by the Federal Emergency Management Agency, according to the Flood Insurance Study for the county. Full pond level means full pond level is 660 feet above mean sea level on Lake Hartwell, 800 feet above mean sea level on Lake Keowee, and 1,110 feet above mean sea level on Lake Jocassee. Half road means a road located so that a cross means section of its width lies on more than one parcel. Lake means a considerable inland body of standing water. Land development means the changing of land characteristics through redevelopment, construction, subdivision into parcels, condominium complexes, apartment complexes, commercial parks, shopping centers, industrial parks, mobile home parks, and similar developments for sale, lease, or any combination of owner and rental characteristics. Lot means a single parcel or tract of contiguous land intended as a unit for transfer of ownership, or for building development, or both. (1) Corner lot means a lot with frontage on at least two intersecting roads located at the point of intersection. (2) Lot depth means the mean horizontal distance between the front and rear lot lines. (3) Double frontage lot means a parcel having frontage on two or more roads which is not located at any intersection of such roads. (4) Lot width, unless indicated otherwise by context, means the straight -line distance between the points where the front building line intersects the two side lot lines. Minor subdivision means a minor subdivision is any subdivision of a parcel that is reviewed by the county that: (1) Results in a total of no more than ten lots; and (2) May or may not involve the construction of a private drive, private road, or public road. Mobile home (manufactured housing unit) means a detached, single-family dwelling designed for long-term occupancy, designed to be transported on its own axle and wheels, arriving at the site in sections or a complete dwelling unit, usually including major appliances and furniture, and ready for occupancy. Removal of wheels and placement of a foundation does not change the mobile home classification. A travel trailer is not a mobile home. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 43 of 81 Multi-family housing means a building or buildings designed to be occupied by two or more households living independently of each other, with the number of households in residence not exceeding the number of dwelling units provided. Natural vegetative buffer means plants, trees, and vegetation that normally survive in the county without the need of fertilizers, herbicides, or pesticides. Oconee County road means any paved road, gravel road, dirt road or bridge that is owned and/or regularly maintained by the county and considered part of the county road system. Open space site means a tract of land provided in residential subdivisions to meet the local recreational needs and desires of residents. Such tracts may include play areas, parks, natural woods, open fields and meadows and areas of scenic beauty. Owner's engineer means an engineer registered and in good standing with the South Carolina Board of Registration for Professional Engineers and Land Surveyors who is the agent of the owner of the land proposed to be subdivided, or which is in the process of being subdivided. Owner's land surveyor means a land surveyor registered and in good standing with the South Carolina Board of Registration for Professional Engineers and Land Surveyors who is the agent of the owner of the land proposed to be subdivided, or which is in the process of being subdivided. Parking, off-street means an area adequate for parking an automobile with room for safely opening doors on both sides, together with properly related access to a public road arranged so that no maneuvering incidental to parking shall occur on any road. Perennial stream means any creek, river, or other watercourse that has flowing water year -round. Person means any individual, corporation, company, partnership, organization, utility and/or municipality. Planning commission means the county planning commission and planning staff specifically authorized to carry out certain functions on its behalf. Plat means a map or drawing which is an accurate graphical representation of a subdivider's plan for a subdivision. (1) Sketch plan means a simple sketch of a proposed subdivision layout showing roads and other principal features. The sketch plan is preparatory to the preliminary and final plats and may enable the subdivider to save time and expense in reaching general agreement as to the form of the plat and the objectives of these regulations. (2) Preliminary plan (plat) means a drawing which shows the proposed layout of a subdivision in sufficient detail to indicate its working ability in all aspects. (3) Final plat (plan) means a drawing which shows the 'as built' layout of all road construction, public utilities, public facilities, and lots to be sold. Potable water means water used or treated by a water company or utility to be sold for human consumption. Private driveway means a driveway that provides vehicular access and road frontage to not more than three single-family residences. Private drive means a privately owned and maintained right-of-way or an easement that specifically grants the right for utilities and all road work, that provides vehicular access and road frontage to not less than four and not more than ten single-family residential lots. Private road means a privately-owned and maintained right-of-way that contains a roadway constructed in accordance with these regulations and provides vehicular access and road frontage to more than ten single -family residential lots. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 44 of 81 Public road means roads, avenues, boulevards, highways, freeways, lanes, courts, thoroughfares, collectors, minor roads, cul-de-sacs and other ways including the entire right-of-way considered public and both dedicated to and accepted by the United States, the State of South Carolina, or the county. (1) Arterial road means a major road with access control, channelized intersections, restricted parking, and that collects and distributes traffic to and from minor arterials and from collector streets. (2) Collector road means a road that typically exceeds 800 ADTs and has the primary purpose of intersecting traffic from intersecting local road and handling movements to the nearest arterial road. A secondary function is to provide direct access to abutting properties. A road that connects local access roads to the highway systems major and high-speed arterial roads. The collector road provides both land access service and traffic service within residential subdivisions. (3) Local road (major) means a road in which the road typical number of average daily traffic (ADT) ranges from 401 to 800 and contains two or more access points. The primary purpose is to provide access to abutting properties and receiving traffic from minor local roads. (4) Local road (minor) means a road in which the typical number of average daily traffic (ADT) ranges from zero to 400 and has the primary purpose of providing access to abutting properties. This road normally terminates in a cul-de-sac, loop or other turnaround, with no more than two access points. Road right-of-way width means an easement within which utility installation, utility maintenance, road way construction, and roadway maintenance shall occur according to the standards put forth in these regulations. The following are the required road rights-of-way and minimum road widths allowable: Arterial roads: Right-of-way: 66 to 120 feet (as determined by the county engineer) Road widths: 28 feet (as determined by the county engineer) Collector roads: Right-of-way: 66 feet Road widths: 24 feet Major local: Right-of-way: 50 feet Road widths: 22 feet Minor local and/or service roads: Right-of-way: 50 feet Road widths: 20 feet The above widths are driving surface widths and exclude widths added by curb and gutter and/or asphalt valleys. Sanitary sewer means a constructed conduit connected with or as a sewer system for the carrying of liquids and solids other than stormwaters to a sanitary treatment facility. Setback means the required minimum distance between every structure and the lot lin es of the lot on which it is located (measured from the road right-of-way at the front of the lot if the road right-of-way projects over the property line, and measured from the property lines on the remaining portions of the property). Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 45 of 81 Setback line means the line indicating the minimum distance permitted between the property line or road right-of-way line, as applicable, and the building line. Sketch plan See Plat (plan). Storm sewer means a constructed conduit connected with or as a storm sewer system for the carrying of stormwaters to a water source. Stream means a flow of water in a channel or bed, such as a brook, creek or river. Street. See Public road. Subdivider means any person, firm, corporation owner, agent, developer, or other legal entity who directly or indirectly attempts to subdivide land within the jurisdiction of this article. See also "developer." Subdivision means all divisions of a tract or parcel of land into two or more lots, building sites, or other divisions for the purpose (whether immediate of future) of sale, lease, or building development; including all division of land involving a new roadway or an alteration in an existing roadway. Also instances in whi ch the further division, relocation of lot lines, or the rearrangement (including combinations of lots) of any lot or lots within a subdivision previously approved or recorded according to law. The alteration of any roadways or the establishment of any new roads within any subdivision previously approved or recorded according to law. A subdivision can include townhouses, condominium complexes, apartment complexes and multi -family housing. The following exceptions are included within this definition only fo r the purpose of requiring that the local planning agency be informed and have a record of the subdivision: (1) The combination or recombination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards of the county; (2) The division of land into parcels of five acres or more where no new street is involved and plats of these exceptions must be received as information by the county planning commission which shall indicate that fact on the plats; and (3) The combination or recombination of entire lots of record where no new street or change in existing streets is involved. Terrain classifications means classification of terrain by grade ranges as follows: Townhouse means a building or group of buildings containing a dwelling unit or units constructed in a series or group of attached units with property lines separating such units. Traditional septic systems means a waste disposal system designed for the treatment and disposal of domestic sewage by means of an onsite septic tank and soil absorption system utilizing a traditional drain field on a single lot. All such systems are subject to the review and approval of the South Carolina Department of Health and Environmental Control. Transfer or sale of lots means any means by which the ownership of a property changes hands; including, but not limited to, the purchase of trade of a property subject to a mortgage, the assumption of a mortgage debt by the property purchaser, and any exchange of possession of the property under a land sales contract or any other land trust device. Utilities means utilities shall consist of any and all utility services to a subdivision, including water, sewer, storm sewer, electricity, telephone, cable television, gas, and sanitary sewerage, whether such utilities are supplied by a private individual, private company, authority, or a governmental entity. View lane means the portion of a natural buffer utilized and maintained by the property owner to e nhance observation of the lake and surrounding landscapes. Typically, the vegetation in the view lane is lower in height and/or smaller in diameter than that found in the rest of the buffer. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 46 of 81 Watercourse means any natural or artificial stream, river, creek, ditch, channel, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows in a definite direction or course, either continuously or intermittently, and has a definite channel, bed, and banks and includes any area adjacent ther eto subject to inundation by reason of overflow or floodwater. Yard means a space that lies between the principal building or buildings and the nearest lot line or road right -of- way, as applicable. The minimum required yard shall be unoccupied and unobstr ucted from the ground upward, except as may be expressly permitted. (1) Front yard means a yard situated between the front building line and the front lot line or road right -of- way, as applicable, extending the full width of the lot. (2) Rear yard means a yard situated between the rear building line and the rear lot line extending the full width of the lot. (3) Side yard means a yard between the side building line and a side lot line that extends from the front yard to the rear yard. (Ord. No. 2008-20, Art. 2, 12-16-2008; Ord. No. 2024-23, §§ 1, 2(Exh. A), 10-15-2024) Cross reference(s)—Definitions generally, § 1-2. Sec. 32-213. Requirements and standards. (a) Unapproved plat prohibition. No plat of the subdivision of any land within the unincorporated areas of the county as now or hereafter established, and any incorporated municipality which contracts with the county for these regulations to be administered within such municipality, sh all be filed with or recorded by the county register of deeds until such plat shall have been submitted to and approved by the county planning commission, planning director, or designee according to the procedures set forth in this article. No road or other way shall be accepted or maintained, nor shall any water line, sewerage, road lighting or similar improvements extended or connected, nor shall any permit be issued by any department of the county for any or other improvements in any subdivision established hereafter which has not been approved by the county planning department and met such requirements as prescribed by the county council. (b) Survey standards. Plats shall be prepared and survey data entered thereon in accordance with the most recent adopted version of the "Minimum Standards Manual of the Practice of Surveying in South Carolina" established by the South Carolina Board of Registration for Professional Engineers and Land Surveyors provided that all elevations information shall refer to Mean Sea Level Datum or other establish datum (a minimum of [Z] assumed elevation with two benchmarks). (c) Subdivision name. (1) All subdivision names must be submitted to the addressing office. Names must be easy to read and pronounce. Proposed names may be rejected by the addressing office if in the opinion of emergency response officials, pronunciation may impair an efficient response. (2) Subdivision names that may be confused as homonyms (having the same or similar pronunciation) of existing subdivision names shall not be approved. (3) Names that are vulgar, ethnically offensive, or otherwise problematic shall not be approved. (4) Subdivision names spelled in an unconventional, complex, or potentially confusing manner shall not be approved. (5) A subdivision shall be designated by only one name. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 47 of 81 (6) Special characters, including numbers, are not allowed. (7) No duplicates of existing subdivision names are allowed. (d) Utilities. When utilizing a road right-of-way, all utility lines shall be buried at a depth of at least 36 inches. Such lines shall be located a minimum of two feet outside the portion of the road to be surfaced to prevent having to cut into the paved surface or reconstruct drainage structures to serve abutting properties. In order to prevent future road cuts, utility stub-outs shall be added to all utility lines extending beyond the roadway to each property line. (e) Road signs. Road name signs shall be installed at all intersections with a subdivision. All other signs shall be installed as required by and at the direction of the county engineer or his/her designee. All signage will be in accordance with the Manual of Uniform Traffic Control. The developer shall be responsible for all costs of road signage for private drives, private roads, and proposed county roads (at a cost determined by resolution of county council from time to time) prior to acceptance of road by the county. Any person who shall willfully or maliciously damage, deface, remove or otherwise tamper with a sign erected by a subdivider or the county designating the name of any county road shall be guilty of a misdemeanor. In addition thereto, such person shall be liable to the county for the cost incurred by the county as a result of said criminal acts. (f) Family transfers. When no consideration, other than a nominal monetary amount and love and affection, is paid to the grantor of subdivisions resulting from family transfers as defined by this secti on of this article, the following shall apply: (1) Subdivision of parcels that results from the conveyance of parcels deeded by parents to children, children to parent, sibling to sibling, grandparents to grandchildren or grandchild to grandparent, and does not involve the construction or extension of any road, bridge, or drainage structure to provide access to interior lots, and does not involve the creation of any new drainage easement, shall be received as information only and approved administratively by the planning director. (g) Minor subdivision. (Reserved). (h) Compliance with road standards. Road plans and supporting documentation needed to comply with all adopted the county road standards shall be included with the submission of subdivision plan s. Approval of the subdivision shall not be granted unless all applicable road standards are met. (Ord. No. 2008-20, Art. 3(3.1[a.], 3.1[b.], 3.2—3.7), 12-16-2008; Ord. No. 2018-14, § 1(Att. A), 12-4-2018) Sec. 32-214. Lot improvements. (a) Lot arrangements. All lots shall be arranged such that there will be no apparent difficulties in securing driveway encroachment permits or building permits for reasons of topography or other conditions and must have driveway access from an approved road. The developer shall be liable for all lots within a proposed subdivision. (b) Lot dimensions. Except where circumstances such as topography, watercourses, road alignment or existing site boundary configurations dictate otherwise, the following requirements sha ll apply: (1) Dimensions of corner lots shall be large enough to allow for the erection of buildings observing the minimum yard setbacks from both streets, without encroaching into side and rear yard setbacks, established in the building line section of this chapter. (2) Depth and width of properties reserved or laid out for business, commercial, or industrial purposes shall be adequate to provide for off-street parking and loading facilities required for that type of development, without encroaching into yard setbacks. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 48 of 81 (c) Lot size. Minimum lot size shall be determined by the underlying zoning district located in chapter 38. All required setbacks shall be met regardless of lot size. No part of a septic system shall be located within any road right-of-way. (d) Building lines. (See section 38-10.2 for all setback requirements in the control free district of the county.) (e) Reserved. (f) Usable area. All lots adjacent to floodplains, creeks, and wetlands should use these natural features as lot boundaries when possible. Lots containing areas unsuitable for usage shall not use these areas in calculating minimum lot area. (g) Septic system setback. (1) Traditional septic systems shall be constructed so that they comply with all regulations of the South Carolina Department of Health and Environmental Control (DHEC). (2) The applicant shall provide the planning director a copy of all South Carolina Depar tment of Health and Environmental Control (DHEC) permit drawings and an approved DHEC permit application for the proposed septic systems utilized within the development. (3) The developer must demonstrate to the planning director that the proposed develop ment will not adversely affect the present water table and the existing water supplies; and also demonstrate that the proposed water supply system will not be adversely affected by existing septic systems. (h) Lot drainage. Lots shall be laid out so as to provide positive drainage away from all buildings, and individual lot drainage shall be coordinated with the general storm drainage pattern for the area. Drainage shall be designed so as to prevent concentration of stormwater from each lot to any adjacent property. Drainage systems used to control water on one property shall not increase the water flow on adjacent properties without legal easements. (i) Lakes and streams. If a tract being subdivided contains a water body, or portion thereof, the ownership of and the responsibility for safe and environmentally compliant maintenance of the water body is to be placed so that it will not become a local government responsibility. The minimum area of a lot required under this article may not be satisfied by land that is under water. Where a watercourse other than storm drainage separates the lot's buildable area from the road providing access, an engineer's certified structure shall be provided linking the buildable area to the road. All watercourses shall remain free of obstructions and degradations. (j) Easements. Easements having a minimum width of ten feet and located along the side or rear lot lines shall be provided as required for utilities and drainage. (k) Entrances. One entrance is required for every 100 lots in a proposed subdivision, or a maximum of 100 lots on a dead end road with a cul-de-sac. This requirement may be waived by the planning director due to topography and feasibility. Every effort shall be made to not have an entrance directly onto an arterial road. (l) Reserved. (Ord. No. 2008-20, Art. 4(4.1—4.12), 12-16-2008; Ord. No. 2015-15, § 1(Att. A), 6-2-2015; Ord. No. 2018-26, § 1(Att. A), 10-2-2018) Sec. 32-215. Blocks. (a) Residential block length. In order that there may be convenient access between various parts of a subdivision and in order to help prevent traffic congestion and undue inconvenience, the length of blocks hereafter Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 49 of 81 established should not exceed 1,800 feet and shall not be less than 600 feet; provided, however, that such length may be modified when appropriate due to the topography or physical shape of the property being subdivided. (b) Residential block width. Blocks shall have sufficient width to allow two tiers of lots. Blocks may be one lot in depth at the boundary of the subdivision, or where single-tier lots are required to separate residential development from through vehicular traffic or nonresidential uses. (Ord. No. 2008-20, Art. 5(5.1, 5.2), 12-16-2008) Sec. 32-216. Drainage and stormwater. (a) General requirements. In most cases the land disturbance permit required by DHEC will have considered the information needed for compliance with this section. However, the county will review the information to ensure that all stormwater runoff will be removed from proposed dev elopments in perpetually maintained drainage systems designed to avoid damage to personal property. The planning director shall not approve any plat of subdivision which fails to make adequate provision for storm or floodwater runoff channels or basins. Stormwater drainage systems shall be separate and independent of any sanitary sewer system. Inlets shall be provided so that surface water is not carried across or around any road intersection except where routing around of small volumes is approved in writing by the county engineer. (b) Nature of stormwater facilities. The applicant may be required by the planning department or county engineer to carry away by pipe or open ditch any spring or surface water that may exist either previously to, or as a result of the subdivision. Such drainage facilities shall be located in the road right-of-way where feasible, or in perpetual unobstructed easements of appropriate width, and shall be constructed in accordance with accepted engineering standards and specifications as approved by the county engineer. All swales, ditches, or other open drainage shall be constructed and established to minimize erosion as approved by the county engineer. (c) Accommodation of upstream drainage areas. The owner's engineer shall determine, certify, and design drainage facilities that are large enough to accommodate potential runoff from its entire upstream drainage area, whether inside or outside the subdivision. (d) Effect on downstream drainage areas. The owner's engineer shall study and provide the planning director and county engineer with sufficient data proving that there are no adverse impacts on existing downstream drainage facilities outside the area of the subdivision. Where it is determined that the additional runoff incident to the development of the subdivision will overload an existing downstream drainage facility, the planning director may withhold approval of the subdivision until provision has been made for the improvement of said potential condition. (e) Floodplain areas. Floodplain areas shall be noted on all plans and plats for proposed development, and shall be preserved from any and all destruction or damage resulting from clearing, grading or dumping of earth, waste material, or stumps, unless explicitly permitted by DHEC, or other appropriate state agency. All construction activity within a development shall comply with standards of the county floodplain ordinance. (1) Where a subdivision is traversed by a watercourse, drainageway, channel, or stream, there shall be provided a stormwater easement or drainage right-of-way conforming substantially to the lines of such watercourse, and of such width and construction or both as will be adequate for the purpose and to accommodate maintenance equipment and activities. Wherever possible, it is desirable that the drainage be maintained by an open channel with landscaped banks and adequate width for maximum potential volume of flow. The planning department will review the information required by the DHEC land disturbance permit to ensure the intentions of 6.12 are met. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 50 of 81 (2) Where topography or other conditions are such as to make impractical the inclusion of drainage facilities within road right-of-way, perpetual unobstructed easements at least 20 feet in width for such drainage facilities shall be provided across property outside the road lines and with satisfactory access to the road. Easements shall be indicated on all plats. Drainage easements shall be carried from the road to a natural watercourse or to other approved or adequate drainage facilities. (3) When a proposed drainage system will increase the maximum flow of water across private land outside the subdivision, appropriate drainage rights must be secured and indicated on the plat. (4) Low-lying lands along watercourses subject to flooding or overflowing during storm periods, included in areas for dedication, shall be preserved and retained in their natural state as drainage ways except where improvements such as grassing, walkways, and playground areas are specifi cally approved by the planning director. (5) All rights-of-way shall contain a permanent drainage easement for all water runoff from the road right - of-way as deemed necessary by the county engineer. It shall be the responsibility of the owner/developer to acquire any necessary drainage easements from private landowners. (Ord. No. 2008-20, Art. 6(6.1—6.5), 12-16-2008) Sec. 32-217. Water facilities. (a) General requirements. (1) Where a public water main is within 1,000 feet of a subdivision boundary, the developer shall connect thereto and install adequate central water facilities. Where the accessible public water main is six inches or greater in diameter, distribution lines shall be at least six inches in diameter. In the event that the water supplier certifies the existence of insufficient water pressure to provide service to six -inch distribution lines to the site, the planning director shall permit appropriate reductions in the diame ter of distribution lines. In cases along permanent cul-de-sacs or circles less than 1,000 feet in length, a minimum diameter of 2½ inches is permitted. (2) Water distribution systems shall be approved by the designated utility entity and the appropriate division of DHEC. (3) The location and design of all water system improvements shall be shown on the preliminary plat, and the cost of installing same shall be included in any bond to be furnished by the developer. (4) All utility lines shall be located a minimum of two feet outside of road surface areas at the edge of the rights-of-way and shall be buried at a depth of at least 36 inches. When the sewer line is located in a road right-of-way and it will be necessary to cut into the road surface to serve the abutting lots, a connection shall be stubbed out to the property line to serve each lot prior to surfacing the road. (b) Individual wells and central water systems. If a public water system is not available, wells may be used or a package central water system provided in such a manner that an adequate supply of potable water will be available to every lot in the subdivision. Central water systems shall be approved by the appropriate division of DHEC. Orders of approval shall be submitted to the planning department. (c) Fire hydrants. Fire hydrants shall be required for all subdivisions except where individual wells are used or a water main of less than six-inch diameter is permitted, and shall be located as defined in the adopted fire code and shall be approved by the applicable fire protection entity. In the event no adequate water supply is available, alternative methods of fire protection may be approved by appropriate fire officials, provided such measures are provided for under adopted fire code. To avoid future road cutting, all underground utilities for Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 51 of 81 fire hydrants, together with the fire hydrants themselves and all other supply improvements shall be installed and approved before any final paving of a road shown on the subdivision plat. (d) Wastewater facilities. (1) Where a public sanitary sewerage system is reasonably accessible and available, the applicant shall connect with same and provide sewers accessible to each lot in the subdivision. When the sewer line is located in a road right-of-way and it will be necessary to cut into the road surface to serve the abutting lots, a connection shall be stubbed out to the property line to serve each lot prior to surfacing the road. (2) Sanitary sewer shall be designed and installed to the design stan dards and specifications of the city, county, or public service district into whose sewer system the subdivision is connecting and all design standards and specifications of the appropriate DHEC division. (3) Where public sanitary sewerage systems are not reasonably accessible or available, package, central or individual waste collection/treatment systems may be provided. These systems must be approved by the appropriate division of DHEC prior to approval of any preliminary subdivision plan. (Ord. No. 2008-20, Art. 7(7.1—7.4), 12-16-2008) Sec. 32-218. Nonresidential subdivisions. (a) General. If a proposed subdivision includes land that is proposed for commercial, industrial or other nonresidential purposes, the layout of the subdivision shall incorporate such provisions and facilities as required by the standards set forth in subsection (b), below. (b) Standards. In addition to the principles and standards in these regulations, which are appropriate to the planning of all subdivisions, the applicant shall demonstrate to the satisfaction of the commission that the road, parcel, and block pattern proposed is specifically adapted to the uses anticipated and takes into account other uses in the vicinity. The following principles and standards shall be observed: (1) Proposed nonresidential parcels shall be suitable in area and dimensions to the types of industrial/commercial development anticipated. (2) Road rights-of-way and pavement shall be adequate to accommodate the type and volume of traffic anticipated to be generated. (3) Special requirements may be imposed by the county with respect to road, curb, gutter, and sidewalk design and construction. (4) Every effort shall be made to protect adjacent residential areas from poten tial nuisances from a proposed commercial or industrial subdivision, including the provision of extra depth in parcels backing up on existing or potential residential development and provisions for a permanently landscaped buffer strip when necessary. (5) Roads carrying nonresidential traffic, especially truck traffic, shall not normally be extended to the boundaries of adjacent existing or potential residential areas. (Ord. No. 2008-20, Art. 8(8.1, 8.2), 12-16-2008) Sec. 32-219. Security in lieu of completion of improvement. In lieu of the completion of the physical development and installation of the required improvements prior to the final plat approval, the county may accept a financial guarantee in the form of cash, bond, or escrow letter of Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 52 of 81 credit with an approved financial institution, in an amount and with conditions satisfactory to it, securing to the county the actual construction and installation of such improvements and utilities within a period specified by the county engineer. (1) If the subdivider wishes to have a final plat approved prior to the installation, inspection and approval of all required improvements he may file a performance of surety bond executed by a surety company licensed to do business in the State of South Carolina, in an amount equal to 125 pe rcent of the owner's engineer (and verified by the county engineer) estimated cost to complete the improvements. The bond shall guarantee the completion of all improvements within a time prescribed by the planning director. (2) If the subdivider wishes to have a final plat approved prior to the installation, inspection and approval of all required improvements, he may establish an escrow account with the county into which the subdivider shall place, prior to the sale of any lot in the subdivision, an amoun t equal to 125 percent of the owner's engineer (verified by the county engineer) estimated cost to complete the improvements. Funds in such escrow account shall be returned to the subdivider following completion of all improvements within time limits prescribed by the county engineer. The final determination for returning the escrowed money to the developer shall be made by the county engineer. (3) In the event that required improvements are not completed, inspected and approved within the required time, the county may expend escrowed funds, securities, or performance bond funds to complete the required improvements. The planning director may also, at his discretion, withhold building permits or occupancy permits in such subdivision until such improvements are completed. In which case, it shall then be unlawful to sell any further lots in the subdivision until all improvements are completed. No occupancy permits shall be issued within the subdivision, unless street improvements are at least adequate for vehicular access by the prospective occupant(s) and by the emergency vehicles and personnel. (4) No building permit shall be issued for the final ten percent of lots in a subdivision, or if ten percent be less than two, for the final two lots of a subdivision, until all public improvements required by the county engineer for the subdivision have been fully completed and the county has accepted all as -built drawings. (5) The developer shall be required to maintain all required public improvements on the indivi dual subdivided lots, if required by the planning director, until acceptance of the improvements by the appropriate utility or government entity. If there are any certificates of occupancy on a street not dedicated to the county, the county may on 12 hours notice effect emergency repairs and charge those costs to the developer. (6) Surety bonds will be returned to the developer following delivery of all as -built drawings to the county engineer, and after acceptance of all improvements by the county. (Ord. No. 2008-20, Art. 9, 12-16-2008) Sec. 32-220. Plat requirements and review procedures. (a) General. No lot proposed to be created through the creation of a subdivision shall be sold until a final plat showing the subdivision has been approved by the planning director, and has been recorded with the county Register of Deeds. (b) Application review. The planning director may approve a minor or exempt subdivision, containing no new roads, after reviewing the final plan. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 53 of 81 (c) Plat recordation. The planning director's approval of a subdivision final plan is contingent on submission of four original copies of the plat to the county Register of Deeds, and recordation of the plat by the Register of Deeds. An authorized copy of the recorded plat shall be submitted to the planning director. (d) Appeal of decision. Any person aggrieved by the planning director's decision to approve or deny an application for subdivision approval may appeal the decision to the planning commission in writ ing within ten working days of said decision as outlined in [section 32-223((d)], of this article. (Ord. No. 2008-20, Art. 10(10.1—10.4), 12-16-2008) Sec. 32-221. Sketch plan. (a) Sketch plan review conference. All persons intending to subdivide or develop property are strongly encouraged to confer with the planning director prior to proceeding. Proposed developments consisting of 20 new housing units shall schedule a sketch plan review prior to any formal application. (b) Basic sketch plan (optional requirements for developments less than 20 units.) (1) The sketch plan shall be drawn to show the approximate layout of the proposed subdivision and its relationship to the surrounding area. (2) Sketch plans are informal, exploratory examinations of a proposed idea. The planning director will review the proposed layout and discuss any issues with the subdivider and may require a detailed sketch plan to be submitted. (c) Detailed sketch plan (required for 20 or more units) (1) The sketch plan shall be drawn at an approximate scale of not less than a scale of 200 feet to one inch and shall include a vicinity map at a scale of not less than two miles to one -inch showing the relationship of the proposed subdivision to the surround ing areas. (2) All sketch plan submittals shall include the following in sketch or narrative form: a. An accounting of total acreage in the tract to be divided and number of lots proposed; b. Arrangement, shape, dimensions, and area of proposed lots; c. Location of existing property lines, easements, road right-of-ways, buildings, or other public ways adjoining the tract to be subdivided; d. Alignment, right-of-way width, and clarification of proposed roads; e. Topography by contour at intervals of not more than 20 feet (as from USGS quad sheets); f. Map scale, north arrow, and date; g. Name/address/telephone number of legal owner or agent and the professional (surveyor or engineer) who will undertake detailed subdivision layout and improvements desi gn; h. Location of watercourses and land subject to flooding based on a 100 -year frequency flood. Owner's surveyor shall indicate if property is or is not in a floodplain; i. The existing and proposed uses of land throughout the subdivision; j. Proposed method of water supply and wastewater treatment and other utility service; k. The proposed name of the subdivision. Created: 2026-05-07 10:21:30 [EST] (Supp. No. 55) Page 54 of 81 (3) A subdivider shall submit a sketch plan of the entire tract even if the subdivider's present plans call for the actual development of only a part of the property. All phases of the subdivision must be shown on the sketch plan and marked as future development. (4) Prior to sketch plan submittal, the subdivider is encouraged to interact with the county soil and water conservation district to obtain soil survey information and written site evaluation comments to be included as part of the sketch plan submittal. (d) Sketch plan review. (1) A subdivider shall submit sketch plan copies and application forms in quantities specified by the planning director. The planning director shall obtain input from the county engineer and affected agencies and shall provide comments in the form of a composite list to the subdivider within 15 working days of sketch plan submitted. (2) If the subdivider disagrees with comments provided, the subdivider may request an informal review by the planning commission in accordance with the county planning commission rules of procedu re. (3) In reviewing a sketch plan and sketch plan comments, the planning commission may affirm such comments or modify them to the extent as such modifications do not depart from the provisions of these adopted regulations. (Ord. No. 2008-20, Art. 11(11.1—11.4), 12-16-2008) Sec. 32-222. Preliminary plan and supporting data. (a) Submittal requirements. (1) Applications for preliminary approval of a subdivision shall be submitted to the planning director for review. (2) The applicant shall submit all appropriate fees at the time of application. (3) Applications shall include four copies of the proposed preliminary plan. (4) The applicant shall submit all responses, amended plans, additional information, or any o ther necessary materials to satisfy all adopted the county regulations. (5) An applicant may withdraw an application for subdivision approval at any time by submitting written notice to the planning director. (6) It shall be unlawful for construction to commence prior to preliminary approval of the plan as defined in this article. (7) Preliminary approval typically permits a developer

Text truncated. Open the original for the full document.

Source: Oconee County website. First collected Oct 15, 2026.