OCONEE COUNTY
SOUTH CAROLINA
PLANNING
& ZONING
PLANNING COMMISSION
Workshop One
Consolidated Issue and Direction Report
Definitions, Development Classifications & Subdivision Review Framework
DOCUMENT STATUS
Working analysis — not formal minutes, adopted ordinance language, or Planning Commission action
PREPARED FOR DeAnn Hester, Planning Director & Planning Commission
MEETING DATE July 24, 2026
PREPARED July 28, 2026
Prepared as a structured record of workshop discussion, direction, unresolved questions, and required validation.
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 2
Purpose and Use of This Report
Use Boundary
This report captures the workshop discussion and the direction expressed by participants. It is not formal minutes, legal advice,
adopted ordinance language, a formal Planning Commission recommendation, or County Council action.
The report is a working register for the Planning Director. It separates matters that are sufficiently clear for drafting from
matters that remain open, illustrative, or dependent on legal, engineering, utility, or agency validation.
Executive Direction Snapshot
DRAFTING DIRECTION
Major/minor subdivision definitions; two-year parent-parcel reset;
anti-circumvention; PDD impact studies; interim data-center
special exception; sketch-plan enforcement; workshop summaries.
RESEARCH / VALIDATION
Traffic-study thresholds; road/street terminology; appeal routing;
vested rights; utility-capacity evidence; guest-house and dwelling-
unit definitions.
POLICY DESIGN
Graduated residential, commercial, and industrial standards;
cumulative traffic; PDD minimums and incentives; General Use
matrix and density.
DEFERRED / FOLLOW-ON
Comprehensive data-center ordinance; post-adoption application
checklists; reserved sections for standards that cannot be
responsibly completed in the current rewrite.
1. Status and Confidence Framework
Status Meaning
Agreed workshop direction Participants expressly agreed on the concept.
Working definition or framework Accepted for drafting and further review, but not formally adopted.
Tentative direction General support exists, but details remain unresolved.
Research required Additional legal, engineering, agency, utility, market, or technical information is
required.
Open policy question Discussed without a settled direction.
Existing procedure reaffirmed Participants confirmed or emphasized an existing requirement.
Example only A number or scenario was illustrative and was not selected as policy.
Confidence levels
• High — The issue, direction, and status were expressly stated or strongly confirmed by the discussion.
• Moderate — The discussion is clear, but the exact ordinance alignment, participant intent, or final status requires interpretation.
• Low — The transcript is ambiguous or incomplete. No Low-confidence findings were necessary in this report.
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 3
2. Definitions, Classifications, and Minor Subdivisions
Working register of definition, classification, family-transfer, parent-parcel, and administrative-consistency issues.
The workshop established a substantive working framework for major and minor subdivisions while reserving several definition questions for research and drafting validation.
Participant /
Group Topic Current Ordinance
Chapter / Section Existing Condition or Issue Workshop Direction Status Confidenc
e
DeAnn and Planning
Commission
Inter-chapter
consistency
Chs. 26, 32, and 38;
primarily Ch. 32
definitions
Terms are defined or used differently among
chapters, creating inconsistent application.
Coordinate definitions and usage across all three chapters
before drafting substantive standards.
Agreed workshop
direction High
Planning
Commission
consensus
Organization of
subdivision
definitions
Ch. 32, §32-212
“Minor subdivision” is separated from the general
subdivision definition, making the ordinance harder
to navigate.
Place Subdivision, Major Subdivision, and Minor
Subdivision together under one organized definition
structure.
Agreed workshop
direction High
Planning
Commission
consensus
Major subdivision
definition Ch. 32, §32-212 The ordinance does not provide a sufficiently clear
independent definition of a major subdivision.
Define a major subdivision as a subdivision that does not
qualify as exempt or minor. Working definition High
Planning
Commission
consensus
Minor subdivision
threshold Ch. 32, §32-212 The existing ten-lot threshold does not clearly state
whether the remainder parcel counts.
Define a minor subdivision as no more than ten total lots,
including the remainder parcel.
Agreed workshop
direction High
Planning
Commission
consensus
Roads in minor
subdivisions
Ch. 32, §§32-212–32-
213; Ch. 26 definitions
Existing language may allow a minor subdivision
to involve construction of a new public or private
road.
A minor subdivision should not require construction of a
new public or private road.
Agreed substantive
direction High
DeAnn and Planning
Commission
Street, road,
roadway, drive, and
driveway
Ch. 26 definitions; Ch.
32, §32-212
Multiple transportation terms are used
inconsistently and may describe different physical
or legal conditions.
Research state and planning usage, preserve valid
distinctions, define undefined terms, and use each term
consistently.
Research required High
Planning
Commission
consensus
Utility extensions in
minor subdivisions Ch. 32, Arts. I and VI
Proposed language could unintentionally prohibit
utility extensions required to serve lots within the
minor subdivision.
Clarify that a minor subdivision does not require utility
extensions intended to serve lots outside the proposed
minor subdivision.
Agreed workshop
direction High
Planning
Commission
consensus
Shared stormwater
infrastructure Ch. 32, Art. VI
A land division without mass grading could be
subjected to infrastructure requirements designed
for a major subdivision.
A minor subdivision should not require shared stormwater
or drainage infrastructure serving more than one lot. Working definition High
Planning
Commission
consensus
Family-transfer
exemption Ch. 32, §32-213
The relationship among family transfers, minor
subdivisions, and retained property requires
clarification.
Retain the previously revised family-transfer language.
The exemption applies when an eligible transfer actually
occurs.
Existing language
reaffirmed High
DeAnn and Planning
Commission
Retained property
versus family transfer Ch. 32, §32-213
An owner may divide property but retain the
resulting parcel rather than transferring it to a
qualifying relative.
Treat the division as a minor subdivision when no
qualifying family conveyance occurs.
Existing ordinance
clarification High
Planning
Commission
participants
Driveway access for
family transfers
Ch. 32, §32-213;
transportation definitions
A prohibition on constructing a “road” should not
unintentionally prevent an ordinary driveway or
drive extension serving a family parcel.
Preserve the road restriction while ensuring that valid
driveway or drive improvements do not automatically
disqualify a family transfer.
Tentative drafting
direction Moderate
DeAnn and Planning
Commission Contiguous parcels Ch. 32, §32-212–32-213
Without a contiguous-parcel rule, related property
could be divided in stages to avoid major-
subdivision requirements.
Add a clear definition of contiguous parcels and use it
when determining subdivision classification.
Agreed workshop
direction High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 4
Participant /
Group Topic Current Ordinance
Chapter / Section Existing Condition or Issue Workshop Direction Status Confidenc
e
Planning
Commission
consensus
Serial subdivision and
circumvention Ch. 32, §§32-212–32-213
An applicant could create up to ten lots repeatedly
and avoid the higher standards applying to a major
subdivision.
Aggregate qualifying divisions from the parent parcel.
Reclassify an application when cumulative activity crosses
the major-subdivision threshold.
Agreed workshop
direction High
Planning
Commission
consensus
Parent-parcel reset Ch. 32 — new or revised
provision
Counting all historic divisions indefinitely could
unreasonably restrict farmers, heirs, and long-term
property owners.
Establish a two-year reset period for the parent parcel. Tie
the reset to the parcel, not the owner or LLC name.
Agreed workshop
direction High
DeAnn and Planning
Commission
Administrative
evidence
Ch. 32, §§32-7 and 32-
213
Staff should not have to investigate an applicant’s
private intent or rely on unavailable information.
Base determinations on recorded plats, recording dates,
assessor information, parcel history, and other accessible
public records.
Agreed workshop
direction High
Planning
Commission
consensus
Objective
administration Chs. 26, 32, and 38 Prior Planning Directors reportedly interpreted
similar provisions differently.
Draft clear, objective standards that produce the same
result regardless of the individual administrator.
Agreed governing
principle High
Planning
Commission
participants
Lot versus dwelling
unit
Chs. 32 and 38
definitions and density
provisions
A development may contain ten lots but more than
ten dwelling units through duplexes, accessory
residences, guest houses, or similar arrangements.
Review every use of “lot,” “residential lot,” “dwelling,”
and “dwelling unit” to ensure the selected term produces
the intended subdivision, access, and density result.
Research and drafting
required High
DeAnn and Planning
Commission
Guest-house
definition
Chs. 32 and 38
definitions
The ordinance apparently lacks a clear distinction
among a guest house, accessory living area, rental
dwelling, and separate residential unit.
Develop a defensible definition addressing kitchens,
independent occupancy, rental use, density, and later
separation from the parent parcel.
Open drafting issue High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 5
3. Graduated Standards and Impact Thresholds
Residential, commercial, industrial, infrastructure, traffic, and comprehensive-impact requirements.
Participants agreed that requirements should increase with development scale and impact. Numerical thresholds remain unresolved unless expressly identified as an agreed rule.
Participant /
Group Topic Current Ordinance
Chapter / Section Existing Condition or Issue Workshop Direction Status Confidenc
e
DeAnn and Planning
Commission
Graduated residential
standards Ch. 32, Art. VI
The ordinance largely moves directly from ten or
fewer lots to eleven or more, with little distinction
between modest and very large development.
Create one or more additional performance tiers so
requirements increase with development scale and impact.
Agreed concept;
thresholds unresolved High
Planning
Commission
consensus
Traffic-study
threshold
Ch. 26, §26-5(b); Ch. 32,
Art. VI
The existing threshold may impose an expensive
study on relatively small projects, but a high
threshold could leave material impacts
unexamined.
Verify SCDOT standards and establish a County threshold
above the minor-subdivision level. The County standard
may be more restrictive for County roads.
Research required High
Planning
Commission
participants
Numerical traffic
thresholds Ch. 26, §26-5(b) Numbers between approximately 20 and 50 homes
were discussed without verified technical support.
Do not treat any number discussed as selected policy.
Obtain authoritative information before choosing the
threshold.
Example only High
DeAnn and Planning
Commission
Cumulative traffic
impacts
Ch. 26, §26-5(b); Ch. 32
development standards
Several developments may each remain below a
threshold but collectively create substantial traffic
and road-capacity impacts.
Develop a method that considers cumulative development,
nearby intersections, road condition, sight distance,
turning movements, and connected road segments.
Agreed concern; method
unresolved High
Planning
Commission
participants
Allocation of
cumulative road costs Ch. 26, §26-5(b)
A later applicant could be charged for an
improvement necessitated partly by earlier
development.
Preserve the issue for later development of a fair
allocation method. Open policy question Moderate
DeAnn and Planning
Commission
Developer-funded
road improvements Ch. 26, §26-5(b)
Development-generated traffic may require turn
lanes, intersection changes, capacity
improvements, or reconstruction.
Retain the principle that improvements attributable to a
development should be funded by the developer rather
than general taxpayers.
Existing policy
reaffirmed High
Planning
Commission
consensus
Commercial
thresholds
Ch. 32 nonresidential
provisions; Ch. 38 use
standards
The ordinance lacks differentiated requirements for
a small stand-alone business versus a large
commercial center.
Develop multiple commercial performance tiers, likely
considering square footage, use, traffic generation, shared
facilities, and site impacts.
Research required High
Planning
Commission
consensus
Industrial thresholds Ch. 32 and Ch. 38
nonresidential provisions
Building area alone may not reflect truck activity,
utility demand, noise, or operational intensity.
Develop separate industrial thresholds using scale and
operational impacts, including truck traffic and
infrastructure demand.
Research required High
Planning
Commission
participants
Commercial and
industrial example
numbers
Chs. 32 and 38
Figures such as 6,000 square feet for commercial
and 60,000 square feet for industrial were
mentioned.
Treat those figures as examples only; no threshold was
approved. Example only High
Planning
Commission
participants
Single-family versus
multifamily Chs. 32 and 38
Similar dwelling-unit counts may create different
parking, infrastructure, density, and operational
effects.
Examine whether residential thresholds should distinguish
single-family, multifamily, and mixed-use development. Open classification issue Moderate
DeAnn and Planning
Commission Full impact studies Chs. 26, 32, and 38
Very large developments may affect more than
traffic, including utilities, schools, fire protection,
emergency services, lighting, and surrounding uses.
Establish a higher threshold requiring a comprehensive
impact study.
Agreed concept;
threshold unresolved High
Planning
Commission
consensus
Impact-study
contents Chs. 26, 32, and 38 “Impact study” is too general and could be
interpreted differently by applicants and staff.
Define required components, potentially including traffic,
sewer, water, electricity, emergency services, schools,
lighting, noise, stormwater, and other use-specific effects.
Agreed drafting
requirement High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 6
Participant /
Group Topic Current Ordinance
Chapter / Section Existing Condition or Issue Workshop Direction Status Confidenc
e
Planning
Commission
participants
Regulatory burden
Ch. 32 and Ch. 38
development
requirements
Broad study requirements could materially increase
costs for smaller or workforce-oriented projects.
Use a relatively high general threshold for full impact
studies and avoid imposing disproportionate requirements
on ordinary or workforce-housing development.
Agreed policy
consideration Moderate
Planning
Commission
consensus
PDD impact study Ch. 38, §38-10.15 A PDD may combine uses, request additional
density, and rely on flexible standards.
Require a full impact study for every PDD, regardless of
project-size threshold.
Agreed workshop
direction High
DeAnn and Planning
Commission Commercial lighting Ch. 38, Appendix A and
applicable standards
Lighting from commercial development may
adversely affect adjacent residential property.
Require photometric analysis when applicable and include
lighting within the broader impact-study framework.
Agreed concept;
applicability unresolved High
Planning
Commission
participants
Noise analysis Ch. 38 use and
compatibility standards
Uses such as industrial facilities or data centers can
create persistent noise impacts not captured by
ordinary site-plan review.
Include noise analysis when the proposed use or
development scale warrants it. Tentative direction High
DeAnn and Planning
Commission
Utility-capacity
evidence
Ch. 32 development
review requirements
A general letter stating that utility service is
“available” may not establish that capacity has
been committed or secured.
Require stronger evidence at the appropriate review stage,
potentially an executed agreement or contract with the
utility provider.
Agreed concept; legal
details unresolved High
Planning
Commission
participants
Shared parking Ch. 38, Appendix A
parking provisions
Different uses may share parking because peak
operating periods differ, but current standards may
not adequately document the assumptions.
Establish clear shared-parking calculations and traffic-
count standards.
Agreed drafting
direction High
DeAnn and Planning
Commission
Change of use or
occupancy
Ch. 38 administrative and
parking provisions
A replacement tenant may generate materially
different traffic or parking demand than the
original approved use.
Require zoning review for a material change of use or
occupancy and revalidate parking and traffic compliance.
Tentative direction; legal
review appropriate High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 7
4. Planned Developments, Rezoning, and General Use
PDD minimums, public review, concept plans, General Use, and vested-rights questions.
The discussion favored objective minimum standards and documented impact review while preserving public and legislative review for rezonings and planned developments.
Participant / Group Topic Current Ordinance
Chapter / Section Existing Condition or Issue Workshop Direction Status Confidenc
e
DeAnn and Planning
Commission
Minimum PDD
standards Ch. 38, §38-10.15
A highly flexible PDD could allow an applicant to
propose its own standards without a sufficient
regulatory floor.
Establish non-negotiable minimum requirements for PDDs. Agreed workshop
direction High
DeAnn and Planning
Commission PDD open space Ch. 38, §38-10.15 Additional density may be requested without an
equivalent public or environmental benefit.
Consider higher open-space requirements and require
qualifying open space to remain naturally undisturbed where
appropriate.
Agreed concept;
percentage unresolved High
DeAnn and Planning
Commission PDD incentive scale Ch. 38, §38-10.15 A rigid standard may not encourage applicants to
provide benefits beyond the minimum.
Consider a sliding scale that permits limited additional density
in exchange for additional open space or other defined
benefits.
Concept for later
consideration Moderate
Planning Commission
consensus PDD public review Ch. 38 rezoning and PDD
procedures
Concern existed that setting minimum standards might
make PDD approval automatic.
Retain staff review, Planning Commission recommendation,
County Council action, public notice, and public participation
for PDD applications.
Agreed workshop
direction High
Planning Commission
participants
Objective standards
versus discretionary
voting
Ch. 38 administrative and
rezoning provisions
Participants want clear, defensible standards and are
concerned about decisions becoming solely political
“thumbs-up or thumbs-down” judgments.
Make the baseline requirements objective and black-and-white
while retaining required public and legislative review for
rezonings and PDDs.
Agreed governing
principle High
DeAnn and Planning
Commission
Binding rezoning
concept plan
Ch. 38, Art. 8 — specific
section to verify
An applicant may secure rezoning with one concept
and later construct a materially different project that
still fits the new zoning category.
Consider approving a rezoning subject to the submitted
concept plan, with a defined minor-change allowance and
renewed review for material changes.
Tentative policy direction High
Planning Commission
participants
Public participation
and technical merit Ch. 38 rezoning process Public opposition may not always reflect comparative
traffic, land-use, or infrastructure impacts.
Preserve legally required public participation but base staff and
Commission analysis on stated standards and documented
impacts.
Governing consideration Moderate
DeAnn and Planning
Commission General Use District Ch. 38 zoning matrix and
General Use provisions
General Use reportedly permits a broad range of
residential, commercial, and industrial activity and is
not adequately represented in the use matrix.
Add General Use to the zoning matrix and determine which
uses should be allowed, restricted, specially reviewed, or
prohibited.
Open policy workstream High
DeAnn and Planning
Commission
General Use density
and rezoning
Ch. 38 dimensional and use
standards
A potential reduction in General Use density could
cause major residential development to require
rezoning.
Evaluate implications for workload, public review,
development rights, and consistency before selecting a density
or rezoning rule.
Open policy question High
Planning Commission
participants Vested rights
Chs. 32 and 38
administrative provisions;
state law
Questions arose over whether prior discussion, filing,
signatures, expenditure, or approval creates a protected
right to proceed.
Clarify the documentation and approvals required to establish
vested rights and distinguish informal activity from formal
County approval.
Legal verification
required High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 8
5. Data Centers
Interim protection and specialized follow-on ordinance work.
The participants separated an immediate zoning safeguard from the later development of a technically complete data-center ordinance.
Participant /
Group Topic Current Ordinance
Chapter / Section Existing Condition or Issue Workshop Direction Status Confidenc
e
DeAnn and Planning
Commission
Interim data-center
classification
Ch. 38 zoning matrix;
§§38-7.2 and 38-10.16,
analyst-aligned
The ordinance does not appear to contain a
sufficiently specific data-center use or siting
standard, particularly in General Use.
Add data centers to the zoning matrix and require a
special-exception permit as an interim safeguard.
Agreed workshop
direction High
DeAnn and Planning
Commission
Long-term data-
center ordinance
Ch. 38 — new
specialized provisions
anticipated
A complete ordinance would need technical
treatment of power, water, heat, noise,
environmental effects, infrastructure, emergency
response, and site retirement.
Defer the comprehensive ordinance until specialized
expertise can be obtained. Revisit after the current rewrite.
Agreed deferred
workstream High
Planning
Commission
participants
Data-center impact
components
Ch. 38; applicable utility
and environmental
provisions
Ordinary development review may not capture the
full lifecycle and infrastructure effects of a data
center.
Future standards should consider water and power
demand, noise, environmental effects, infrastructure
capacity, and decommissioning.
Future research scope High
Planning
Commission
participants
Current utility
availability
Outside direct ordinance
control
Participants asserted that current electric or gas
capacity may be insufficient for a large facility.
Do not rely on assumed current utility constraints as the
County’s long-term regulatory safeguard.
Analytical inference
from discussion Moderate
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 9
6. Review, Approval, and Administrative Governance
Plan review, quality control, checklists, interpretation authority, appeals, and workshop documentation.
The workshop emphasized consistent procedures, buildability review, a second set of eyes, clear appeal routing, and a documented record of workshop rationale.
Participant /
Group Topic Current Ordinance
Chapter / Section Existing Condition or Issue Workshop Direction Status Confidenc
e
DeAnn and Planning
Commission Sketch-plan review Ch. 32 major-subdivision
procedures
The ordinance contains a sketch-plan step, but it
reportedly has not always been consistently
required.
Enforce sketch-plan review for major subdivisions before
the applicant incurs the expense of detailed engineering
and studies.
Existing procedure
reaffirmed High
DeAnn and Planning
Commission
Scaled sketch-plan
detail
Ch. 32 procedural
provisions
A small major subdivision and a large mixed-use
development do not require the same level of
conceptual detail.
Use a proportionate or sliding level of detail based on
project scale and complexity.
Existing practice
clarified High
DeAnn and Planning
Commission Review sequence Ch. 32 procedural
provisions
Applicants need a clear sequence and clear
deliverables.
Retain the general progression of sketch plan, preliminary
plan or plat with supporting studies and construction
drawings, and final plat.
Existing procedure
reaffirmed High
DeAnn Detailed lot review
Ch. 32 subdivision
review; Ch. 38
dimensional standards
A technically conforming lot may still lack a usable
building area because of setbacks, septic
placement, topography, or lake requirements.
Review each proposed lot for dimensions, setbacks,
buildable area, access, and relevant septic or site
constraints.
Existing review
responsibility reaffirmed High
Planning
Commission
participant
Buildability and
consumer protection Chs. 32 and 38 Prior developments allegedly included lots that
could not accommodate a compliant residence.
Ensure subdivision review confirms that proposed lots
have a viable building envelope under applicable
standards.
Agreed administrative
expectation High
DeAnn and Planning
Commission Second-level review Ch. 32 administrative
provisions
A single reviewer creates quality-control and
continuity risk.
Use a second qualified reviewer when possible, including
Roads and Bridges, internal staff, SCDOT, DES, or
another responsible agency.
Agreed operating
principle High
DeAnn Staffing constraint Administrative rather
than ordinance-specific
The Planning Director is currently the only
principal reviewer within the Planning office.
Continue cross-department review while building internal
capacity for a reliable second set of eyes.
Operating condition
noted High
Planning
Commission
consensus
Application checklists Ch. 32 procedural
requirements
Current checklists are reportedly incomplete,
outdated, inconsistent, or unavailable.
After ordinance adoption, produce public-facing and staff
checklists for minor subdivisions, each major-
development tier, commercial development, and industrial
development.
Agreed post-adoption
deliverable High
Planning
Commission
consensus
Checklist alignment Ch. 32 and Ch. 38 A single checklist will not fit every classification or
threshold.
Align each checklist with the requirements triggered by
the applicable classification and performance tier.
Agreed workshop
direction High
DeAnn and Planning
Commission
Planning Commission
interpretation role
Ch. 32 administrative and
appeals provisions
Ambiguous provisions have reportedly been
handled inconsistently or directed to the wrong
body.
Clearly authorize unresolved development-standard
interpretations to be placed before the Planning
Commission when appropriate.
Agreed direction; legal
wording required High
DeAnn and Planning
Commission
Planning Commission
versus BZA
Chs. 32 and 38 appeals
and variance provisions
The appropriate decision and appeal body depends
on whether the matter involves development
standards, zoning administration, variance
authority, or a quasi-judicial appeal.
Clarify which matters go to the Planning Commission,
BZA, County Council, or court. Keep development-design
standards under Planning Commission authority where
legally appropriate.
Research and legal
review required High
Planning
Commission
participants
Appeal pathway Chs. 32 and 38
Sending a matter to the wrong body may change
whether the next appeal is internal to the County or
proceeds to court.
Make the initial forum and appeal route explicit for each
type of decision.
Agreed drafting
objective High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 10
Participant /
Group Topic Current Ordinance
Chapter / Section Existing Condition or Issue Workshop Direction Status Confidenc
e
Planning
Commission
consensus
Clerical and agency
updates Chs. 26, 32, and 38
Existing drafts contain outdated terminology,
including former agency names and inconsistent
technical terms.
Retain previously approved noncontroversial corrections,
such as updating DHEC references to DES, unless a
substantive issue is identified.
Existing revisions
reaffirmed High
Planning
Commission
participant
Reserved ordinance
sections Chs. 32 and 38 Some necessary subjects may not be sufficiently
developed before the rewrite deadline.
Consider reserving clearly identified sections or line items
for later specialized standards rather than forcing
incomplete language into the current draft.
Tentative direction Moderate
DeAnn and Planning
Commission
Workshop
documentation
Administrative
governance
Participants need a defensible record of what was
discussed and why directions were selected.
Produce a summary after each workshop documenting
issues, rationale, agreements, and unresolved matters for
participant validation.
Agreed recurring
deliverable High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 11
7. Consolidated Decisions and Working Directions
The following matters were sufficiently clear to support continued drafting or administrative development, subject to normal
legal and technical review:
• A coordinated major/minor subdivision definition structure.
• A ten-lot minor-subdivision limit that includes the remainder parcel.
• Exclusion of subdivisions requiring new public or private roads from minor status.
• Contiguous-parcel and anti-circumvention language.
• A two-year parent-parcel reset tied to the parcel rather than ownership.
• Public-record-based administrative determinations.
• Graduated residential, commercial, and industrial performance tiers.
• Mandatory comprehensive impact studies for PDDs.
• Minimum PDD standards with continued public and legislative review.
• Interim special-exception treatment for data centers.
• Formal enforcement of the major-subdivision sketch-plan process.
• Detailed lot-by-lot review for buildability.
• Classification-specific application checklists after ordinance adoption.
• Clear routing of interpretations, variances, and appeals.
• A written summary after each workshop.
8. Matters Not Yet Decided
These matters should not be represented as settled policy or incorporated as final numeric or legal standards without additio nal
validation:
• The traffic-impact-study threshold.
• The number and boundaries of residential performance tiers.
• Commercial and industrial square-footage or impact thresholds.
• The general full-impact-study threshold and required study contents.
• The method for assigning cumulative road-improvement costs.
• Whether single-family and multifamily projects require separate threshold structures.
• PDD open-space percentages and density incentives.
• General Use density and permitted-use restrictions.
• The degree to which a rezoning should be tied to its concept plan.
• The definitions of guest house, accessory dwelling, dwelling unit, and related rental activity.
• The precise division of authority among the Planning Commission, BZA, County Council, and the courts.
• The final legal definitions of road, street, roadway, drive, and driveway.
9. Illustrative Numbers — Not Adopted
Control Note
The workshop used several numbers to test concepts. None of the figures below should enter draft ordinance language unless
independently researched, justified, and affirmatively selected.
• Traffic-study possibilities between roughly 20 and 50 homes.
• A hypothetical 1,000-unit full-impact-study threshold.
• A 6,000-square-foot commercial threshold.
• A 60,000-square-foot industrial threshold.
• PDD examples involving 30% or 40% open space and density adjustments.
• A possible 10% concept-plan deviation allowance.
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Workshop One Working Report Page 12
10. Status
CONTINUE — WITH BOUNDED USE
Use this consolidated matrix as the working register for the Planning Commission Workshop One. Proceed to drafting only for
items marked Agreed workshop direction, Working definition or framework, or Existing procedure reaffirmed. Hold numerical
thresholds, appeal-pathway changes, General Use restrictions, guest-house classifications, concept-plan controls, and
comprehensive data-center standards until the identified research or legal validation is complete.
END OF WORKING REPORT
WORKING ANALYSIS Planning Commission Workshop Two Page 1
OCONEE COUNTY
SOUTH CAROLINA
PLANNING
& ZONING
PLANNING COMMISSION
Workshop Two
Consolidated Issue and Direction Report
Roads, Access, and Infrastructure Responsibility
DOCUMENT STATUS
Working analysis — not formal minutes, adopted ordinance language or Planning Commission action
PREPARED FOR DeAnn Hester, Planning Director, Planning Commission
MEETING DATE July 24, 2026
PREPARED July 28, 2026
Prepared as a structured record of workshop discussion, drafting direction, material qualifications, unresolved questions, and required validation.
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 2
Purpose and Use of This Report
USE BOUNDARY
This report is a working register for the Planning Director. It distinguishes matters that are sufficiently clear for continued drafting from
matters that remain contested, illustrative, or dependent on legal, engineering, fire-service, ordinance-history, or agency validation.
The workshop was expressly conducted to establish direction for language. Nothing discussed in the session constitutes
ordinance adoption, a formal Planning Commission recommendation, or County Council action .
Executive Direction Snapshot
DRAFTING CAN PROCEED
Move §26-2 private-road development standards to Chapter 32; retain §26-
6 in Chapter 26; consolidate definitions; structure engineering certification;
clarify private-road disclosure, maintenance, and general County
acceptance posture.
VALIDATE BEFORE FINAL LANGUAGE
Road-classification values; exact meaning of the 20-foot minimum;
SCDOT/AASHTO editions; verified grandfather date; fire-code
requirements; legal authority and appeal implications; the continuing
appropriateness of the 11-lot trigger.
QUALIFIED OR CONTESTED
Use of an SCDOT-based framework; project-specific right-of-way;
proportional burden on smaller projects; the relationship between public-
road practice and private subdivision standards; material dissent should
remain visible.
ASSIGNED FOLLOW-UP
DeAnn and Kyle develop the road-classification and traffic-study package;
verify ordinance history and technical citations; obtain fire-service and
County counsel review; produce a validated workshop summary for the full
Commission.
Decision Gate
WORKING GATE
Proceed with chapter relocation, coordinated definitions, private-road disclosure, engineering-certification structure, private-maintenance
language, and the general road-acceptance posture. Hold final numerical and legal language until the identified technical, legal, fire-
service, and ordinance-history validation is complete.
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 3
1. Status and Confidence Framework
Agreed workshop direction Participants clearly concurred on the concept or drafting action.
Working direction with qualification Drafting may proceed, but material concerns, dissent, or unresolved implementation issues remain.
Tentative drafting direction The concept was supported, but detail, scope, or enforceability requires refinement.
Existing procedure reaffirmed Participants retained or clarified an existing practice or policy.
Research required Additional factual, technical, agency, or ordinance-history work is necessary.
Legal review required Authority, liability, property rights, appeal routing, or enforceability requires County counsel.
Open policy question The issue was discussed without a settled direction.
Example only A number or project was used illustratively and was not adopted.
Confidence Levels
• High — The issue, direction, and status were expressly stated or strongly confirmed by the discussion.
• Moderate — The discussion is clear, but exact ordinance alignment, legal effect, participant intent, or final status requires
interpretation.
• Low — The transcript is ambiguous or incomplete. No Low-confidence findings were necessary in this report.
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 4
2. Ordinance Structure and Regulatory Authority
Chapter placement, scope, enabling authority, coordinated definitions, and external-reference governance.
Participant or Group Topic Current Ordinance
Chapter / Section
Existing Condition or Issue Workshop Direction Workshop Status Confidence
Planning Director and working group Relocation of private-road standards
Ch. 26, §26-2; Ch. 32 land-
development and subdivision
regulations
Private-road standards are housed in the Roads and Bridges
chapter even though they principally apply when land is
subdivided or developed.
Move §26-2 and related private-road development standards into
Chapter 32 so subdivision requirements are consolidated in one
location.
Agreed workshop
direction High
Planning Director and working group County road-acceptance provisions Ch. 26, §26-6 Road acceptance concerns the County road system rather than
ordinary subdivision design. Keep the County road-acceptance provisions in Chapter 26. Agreed workshop
direction High
Planning Director Scope of Chapter 32 road standards Ch. 32 — new or relocated
provisions
Existing language may be read to regulate any private access
road, including a farm road unrelated to development.
Clarify that the relocated standards apply to roads created or
materially altered in connection with land development or
subdivision.
Agreed drafting
objective High
Planning Director and Roads and
Bridges representative Authority over private-road standards
Ch. 26, §26-2; state enabling
authority referenced but not
identified precisely
A participant questioned whether state law prevents the
County from regulating private roads. The Planning Director
stated that other enabling provisions authorize private-road
development standards.
Preserve County regulation of private subdivision roads, but
confirm the specific statutory authority during legal review. Legal review required Moderate
Planning Director and working group Definitions following chapter
relocation Ch. 32 definitions
Terms used in the relocated provisions may not currently be
defined in Chapter 32 or may be defined differently in Chapter
38.
Add all necessary private-road, road-classification, drive, driveway,
and related definitions to Chapter 32 and coordinate them across
chapters.
Agreed workshop
direction High
Working group External technical references Chs. 26 and 32
The ordinance refers to external manuals without always
identifying the edition or whether future updates apply
automatically.
State the controlling manual and edition clearly. Prefer an adopted
edition rather than automatically incorporating every future revision
unless the County intentionally chooses otherwise.
Tentative drafting
direction Moderate
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 5
3. Private-Road Design, Construction, and Right-of-Way
Engineering framework, dissent, dimensional clarity, project-specific right-of-way, certification, and prospective application.
Participant or Group Topic Current Ordinance
Chapter / Section
Existing Condition or Issue Workshop Direction Workshop Status Confidence
Planning Director, Roads and
Bridges representative, and
working group
Private-road design
standard
Ch. 26, §26-2(c), proposed
relocation to Ch. 32
Earlier draft revisions removed references tying private-road
design to public-road criteria, potentially leaving insufficient
design guidance.
Require private subdivision roads to be engineered using the applicable
SCDOT roadway-design framework, subject to County-defined minimums
and classifications.
Working direction with qualification High
Planning Commission participant Material dissent regarding
SCDOT framework Ch. 26, §26-2(c)
A participant questioned applying public-road design
principles to private property, particularly when prior
Commission work had reduced right-of-way requirements.
Carry the proposed SCDOT-based approach forward for full Planning
Commission consideration, while preserving the objection and rationale in
the workshop record.
Material dissent recorded High
Working group Minimum width Ch. 26, §26-2
The discussion repeatedly referred to a 20-foot minimum,
but participants alternated among pavement width, drivable
width, fire-access width, and right-of-way width.
Retain a 20-foot floor while using project-specific engineering for additional
width. Working direction; drafting ambiguity High
Planning Director and Roads and
Bridges representative
Project-specific right-of-
way
Ch. 26, §26-2; proposed
Ch. 32
A fixed right-of-way may not account for terrain, drainage,
fills, cuts, clear zones, curves, sidewalks, or maintenance
access.
Allow the engineer to establish the required right-of-way based on site and
road design, subject to the County minimum and identified design standard. Working direction with qualification High
Planning Commission participant Predictability of project-
specific standards Proposed Ch. 32
Applicants may not know the required right-of-way until an
engineer completes the design, and different engineers may
reach different conclusions.
Require the engineer to document and certify the design basis. Consider
explanatory tables or guidance so applicants can understand likely
requirements earlier.
Open implementation issue High
Roads and Bridges representative Purpose of right-of-way Proposed Ch. 32 Some discussion treated right-of-way primarily as a utility
easement.
Clarify that right-of-way also supports drainage, clear zones, slopes,
shoulders, maintenance, sight distance, pedestrian facilities, and safe road
operation.
Agreed technical clarification High
Planning Director and working
group
Road-design versus road-
construction standards Ch. 26, §26-2(c)(3)–(4)
The SCDOT roadway-design manual addresses geometry
and design, while actual construction methods and materials
require separate treatment.
Separate the design requirement from the construction requirement. Agreed workshop direction High
Working group Construction certification Proposed Ch. 32 private-
road standards
The draft may specify pavement and base requirements
without requiring a professional to certify that construction
complied with the plans.
Require an appropriately qualified engineer to certify that the road was
constructed according to the approved design and sound engineering
principles.
Agreed workshop direction High
Working group Use of SCDOT
construction specifications Proposed Ch. 32
Full incorporation of the extensive SCDOT highway-
construction specifications may be excessive for every
private subdivision road.
Evaluate whether engineer certification and selected construction standards
can provide adequate protection without incorporating the entire specification
manual.
Open drafting question Moderate
Planning Director Professional certification
responsibilities
Ch. 32 plan and plat
procedures
Engineers and surveyors have different professional
responsibilities; some certifications are currently placed on
documents that the named professional may not
appropriately sign.
Assign design and construction certifications to engineers and plat or
boundary certifications to surveyors. Agreed drafting objective High
Working group
Existing private-road
condition versus new
construction
Proposed Ch. 32
Applying contemporary design requirements to existing
roads could create disproportionate burdens or require
acquisition of additional property.
Apply new design standards prospectively to new or materially expanded
development, subject to a clearly drafted grandfathering provision. Tentative direction Moderate
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 6
4. Road Classifications and Development Thresholds
County classification structure, controlling thresholds, follow-up ownership, proportionality, and anti-circumvention concerns.
Participant or Group Topic Current Ordinance Chapter /
Section
Existing Condition or Issue Workshop Direction Workshop Status Confidence
Planning Director and Roads and
Bridges representative Road classifications
Ch. 26 road-classification
provisions; proposed relocation to
Ch. 32 for development roads
The ordinance and external manuals may use different
thresholds for local-minor, local-major, collector, and other
classifications.
Develop a definitive County classification table for subdivision
roads and connect each classification to the applicable standards. Agreed workshop direction High
Planning Director Classification presentation Proposed Ch. 32 Applicants cannot readily determine which road classification
applies.
Present the classifications in a clear table or graphic showing
traffic volume and applicable design obligations. Agreed drafting objective High
Roads and Bridges representative and
Planning Director
County versus AASHTO
thresholds
Ch. 26 and external design
references
County language reportedly uses a lower traffic level for
certain local roads than AASHTO-based classifications,
creating conflict during review.
State expressly which County classification controls and avoid
leaving reviewers to choose between conflicting thresholds. Agreed workshop direction High
Planning Director and Roads and
Bridges representative Follow-up ownership Proposed Ch. 32 The final road-classification values and language were not
completed during the workshop.
DeAnn and Kyle will develop and package proposed
classifications for further review.
Research and drafting
assigned High
Working group Eleven-lot trigger for road
standards
Chs. 26 and 32; relationship to
major-subdivision definition
The current structure applies major-subdivision road
requirements beginning with the eleventh lot. Participants
disagreed over whether that remains proportionate under the
proposed engineering standard.
No final decision. Evaluate whether 11 remains the appropriate
trigger or whether a graduated road-standard structure is
warranted.
Open policy question High
Planning Director Circumvention risk Ch. 32 subdivision standards
A higher road-design threshold could allow a larger project to
be divided into multiple smaller subdivisions, each using a
lower road standard.
Any graduated standard must contain aggregation or anti-
circumvention provisions so related phases and contiguous
projects are evaluated together.
Agreed concern; method
unresolved High
Planning Commission participant Small-project burden Proposed Ch. 32
Requiring the same engineering approach for an 11-lot project
and a major master-planned development may be
disproportionate.
Examine an intermediate tier rather than assuming the current
11-lot distinction is sufficient for all road requirements. Open policy question High
Working group Historical numerical examples Chs. 26 and 32
The discussion included 400, 800, and approximately 1,200
daily trips, as well as a general estimate of ten trips per single-
family residence.
Treat these numbers as analytical examples until the County
confirms the controlling source and affirmatively adopts a
classification table.
Example only High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 7
5. Traffic Studies, Capacity, and Developer Responsibility
Study scope, graduated requirements, cumulative effects, road improvements, and County review of professional submissions.
Participant or Group Topic Current Ordinance Chapter / Section Existing Condition or Issue Workshop Direction Workshop Status Confidence
Planning Director and Roads and
Bridges representative Traffic-impact studies Ch. 26, §26-5; related Ch. 32 development
standards
Existing requirements do not consistently define the study
scope, road classification, or review standard.
Rewrite the traffic-study requirements to identify exactly
what must be evaluated and which County standards control. Agreed workshop direction High
Working group Graduated study
requirements Ch. 26, §26-5; proposed Ch. 32 A full study may be disproportionate for a modest development
but insufficiently detailed for a large project.
Use graduated requirements based on project size, trip
generation, affected roads, and likely impacts. Agreed workshop direction High
Planning Director Study threshold Ch. 26, §26-5
The current ordinance reportedly requires a study for
developments exceeding ten units on affected County roads,
while earlier workshop discussion contemplated a higher or
graduated trigger.
Confirm and adopt the threshold during later drafting. No
numerical threshold was finalized. Open policy question High
Planning Director and Roads and
Bridges representative
County-required study
content Chs. 26 and 32
SCDOT studies may focus principally on intersection level of
service and state requirements rather than the full information
the County needs.
Require County studies to address additional County
concerns rather than relying solely on the minimum DOT
scope.
Agreed workshop direction High
Working group Potential study components Chs. 26 and 32 Basic trip counts may not capture the full impact.
Consider road condition, road classification, sight distance,
intersections, turning movements, access design, cumulative
traffic, distribution of trips, and required improvements.
Tentative drafting
direction High
Planning Director and working group Cumulative impacts Chs. 26 and 32 Several developments may individually remain below a
threshold while collectively affecting the same road corridor.
Develop an approach for considering cumulative and phased
development impacts.
Agreed concern; method
unresolved High
Working group Allocation of traffic Ch. 26, §26-5 A project with access to more than one road will not place every
generated trip on each road.
Require the traffic analysis to document directional trip
distribution rather than assigning all trips to every access
road.
Existing technical practice
reaffirmed High
Working group Developer-funded studies Ch. 26, §26-5 The County requires technical information because the
development creates the potential impact.
Continue requiring the developer to retain and pay the
qualified traffic professional.
Existing procedure
reaffirmed High
Planning Director and working group Developer-funded
improvements Ch. 26, §26-5 Development may require turn lanes, intersection
improvements, road reconstruction, or other upgrades.
Retain the principle that improvements attributable to the
development are the developer’s responsibility rather than a
general taxpayer burden.
Existing policy reaffirmed High
Roads and Bridges representative County review of stamped
studies Ch. 26, §26-5 County staff may receive an engineer-stamped study based on a
classification or threshold inconsistent with the ordinance.
Clarify the controlling classifications so staff can evaluate
the study against an express County standard. Agreed workshop direction High
Working group Specific projects discussed Not project-specific ordinance provisions Large developments and existing corridors were used to test
how the proposed standards might operate.
Do not treat workshop estimates, project sizes, traffic counts,
or improvement assumptions as findings about any pending
project.
Example only High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 8
6. Road Acceptance, Connectivity, and Recorded Responsibilities
County acceptance posture, public benefit, private-road disclosure, future acceptance, and access beyond the development.
Participant or Group Topic Current Ordinance
Chapter / Section
Existing Condition or Issue Workshop Direction Workshop Status Confidence
Planning Director and working group General County acceptance posture Ch. 26, §26-6 The County has expressed that it does not intend routinely to
accept subdivision roads serving only the subdivision.
Preserve a presumption that ordinary internal subdivision roads
remain private. Agreed workshop direction High
Working group Exceptions for public benefit Ch. 26, §26-6 Some development roads may provide regional connectivity,
secondary access, or meaningful public transportation value.
Preserve an avenue for County acceptance when the road
provides a demonstrated public benefit and County Council
chooses to accept it.
Agreed workshop direction High
Working group Dead-end roads Ch. 26, §26-6 A road ending within one subdivision generally serves a limited
population and provides little network benefit.
Do not ordinarily accept dead-end internal subdivision roads.
Give greater consideration to through routes or roads with
multiple connections.
Tentative acceptance criterion High
Planning Director Prior proposed acceptance language Ch. 26, §26-6 Kyle previously prepared road-acceptance language for Council,
but it was not incorporated into the workshop copy.
Incorporate that prior language into the working draft for
review. Drafting follow-up assigned High
Working group Private-road status disclosure Ch. 32 plat requirements
Purchasers have reportedly been told that a road would
eventually become County-maintained when that status was
uncertain.
Require plats and related development records to state clearly
when roads are private and who is responsible for maintenance. Agreed workshop direction High
Working group Roads intended for future acceptance Chs. 26 and 32
Existing language may create a back door by implying that a
private road will later be accepted without full design, testing,
inspection, or Council action.
Distinguish clearly between roads that will remain private and
roads specifically designed and documented for a future
acceptance request.
Agreed drafting objective High
Planning Director Final-plat wording Ch. 32 final-plat provisions
Language stating that roads “will be constructed” is
inappropriate on a final plat if construction must already be
complete.
Revise the certification language to reflect the actual stage of
construction and approval. Agreed drafting direction High
Working group Roads serving property outside the
development
Ch. 26, §26-2; proposed Ch.
32
Prior language prohibited a private road from serving property
outside the development, potentially preventing logical
connectivity or future access.
Maintain the deletion of the categorical prohibition and address
external access through the approved design. Working direction Moderate
Working group Private right-of-way and public access
Private easement and property
law; precise ordinance location
unresolved
Participants questioned whether a private right-of-way
automatically grants public access.
Do not characterize private right-of-way as public access. Any
public-use, easement, or maintenance rights must be established
through recorded instruments and legal authority.
Legal clarification required Moderate
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 9
7. Drives, Driveways, Grandfathering, and Fire Access
Objective grandfathering, upgrade triggers, dimensional terminology, fire-service validation, and lot-versus-dwelling treatment.
Participant or Group Topic Current Ordinance Chapter /
Section
Existing Condition or Issue Workshop Direction Workshop Status Confidence
Planning Director and Roads and
Bridges representative Inconsistent grandfathering Ch. 26, §26-2; proposed Ch. 32 Planning and Roads and Bridges have historically interpreted
grandfathering differently.
Replace the broad grandfathering clause with an
objective date and clearly stated triggering
conditions.
Agreed workshop direction High
Working group Grandfathering date Ch. 26, §26-2
Participants believed the relevant standard was adopted in 2008,
possibly December 16, but did not verify the controlling
enactment date.
Use the actual adoption date of the applicable drive
and driveway standard after confirming the
ordinance history.
Research required High
Working group Existing accesses Ch. 26, §26-2
An access existing before the standards were adopted may not
be capable of meeting modern width or fire-access requirements
without substantial impact.
Treat qualifying accesses existing and in use before
the verified adoption date as grandfathered.
Tentative drafting
direction High
Working group Post-adoption changes Ch. 26, §26-2
If grandfathered it is unclear when adding lots or dwellings
causes a driveway to become a drive or a drive to become a
road.
State when a change in use, lot count, or
classification requires an upgrade.
Agreed drafting objective;
trigger unresolved High
Planning Director and working group Reduced private-drive width Ch. 26, §26-2 Prior Commission revisions reportedly reduced the private-drive
right-of-way requirement from 50 feet to 20 feet.
Retain the previously proposed 20-foot minimum
while clarifying whether it measures access width,
fire lane, pavement, or right-of-way.
Working direction;
ambiguity remains High
Roads and Bridges representative Long driveway and fire-service access Ch. 26, §26-2; applicable fire code
A technical concern was raised about supplying fire protection
along very long, narrow accesses, including an illustrative
1,000-foot distance.
Obtain direct input from the responsible fire chiefs
and identify the controlling fire-code sections before
setting a maximum distance or width standard.
Research required High
Working group Fire and insurance warning Ch. 26, §26-2
A participant suggested notifying property owners that a
substandard access might affect emergency response or
insurance. Others noted that such a warning could affect
uninvolved owners.
Do not adopt a warning provision without legal and
fire-service review.
Legal and technical review
required High
Working group Fire-code citation Ch. 26, §26-2; proposed Ch. 32 Generic references to “current fire codes” do not tell an
applicant which standard applies.
Cite the applicable adopted fire-code provisions
specifically. Agreed drafting objective High
Working group Lots versus dwellings Ch. 26, §26-2; Ch. 32 definitions
Counting dwellings can cause a guest house, accessory
residence, or apartment over a garage to alter the access
classification even though the number of lots has not changed.
Use “lots” where lot count is the intended trigger
and separately regulate actual occupancy or
dwelling impacts where necessary.
Agreed workshop direction High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 10
8. Bridges, Culverts, Drainage, Signs, and Maintenance
Structural certification, signage, inspection allocation, stormwater references, encroachment permits, and private maintenance.
Participant or Group Topic Current Ordinance Chapter /
Section
Existing Condition or Issue Workshop Direction Workshop Status Confidence
Planning Director and Roads and
Bridges representative Private bridges and culverts Ch. 26, §26-2; proposed Ch. 32 The ordinance may require a weight limit without a
defined verification process.
Require engineered design and certification for bridges or major
culverts, particularly where perennial streams or emergency-vehicle
loading are involved.
Agreed workshop direction High
Working group Weight-limit signs Proposed Ch. 32 The County has not routinely inspected whether
required signs were installed.
Require the applicant to provide evidence that the appropriate load or
warning signage has been installed. Agreed workshop direction High
Working group Allocation of inspection responsibility Proposed Ch. 32 A requirement without a named verification method
could create an implied County inspection duty.
State whether compliance is verified through engineer certification,
applicant documentation, County inspection, or another identified
process.
Agreed drafting objective High
Working group Drainage from private access Proposed Ch. 32 Private drives and roads must shed water without
damaging the access or adjacent property.
Retain language requiring appropriate drainage features consistent with
accepted road-construction practice. Existing revision reaffirmed High
Working group Stormwater references Proposed Ch. 32
A generic reference to “all applicable regulations”
leaves applicants uncertain about the controlling
standard.
Cite the specific applicable South Carolina DES stormwater-control
manual or program. Verify the exact title and acronym before drafting.
Agreed direction; citation
verification required High
Working group Traffic-control devices Proposed Ch. 32 Road and warning signs require a recognized design
and placement standard.
Reference the Manual on Uniform Traffic Control Devices and identify
the adopted edition. Tentative drafting direction Moderate
Working group Encroachment permits Chs. 26 and 32 An access connecting to an existing public road may
require a County or state encroachment permit.
State that the applicable encroachment permit is required when the
project connects to a regulated public road. Tentative drafting direction High
Roads and Bridges representative Private maintenance responsibility Proposed Ch. 32 Wording may imply that the County verifies or
performs ongoing maintenance.
State that maintenance responsibility rests with the private owner,
association, or other recorded responsible party and does not create an
ongoing County maintenance duty.
Agreed drafting objective High
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 11
9. Secondary Issues Identified During the Workshop
Nonconforming structures, prior approvals, as-built verification, right-of-way records, and related Chapter 26 revisions.
Participant or Group Topic Current Ordinance Chapter /
Section
Existing Condition or Issue Workshop Direction Workshop Status Confidence
Planning Director Structures affected by later right-of-
way changes
Ch. 38 nonconforming-structure
provisions
A lawfully permitted house may later fall within a setback
because a right-of-way expands or is conveyed.
Clarify that a structure lawfully constructed under
the standards applicable at the time is a lawful
nonconforming structure rather than an ordinance
violation.
Research and drafting required High
Planning Director Erroneously approved structures Ch. 38 nonconforming provisions A prior County approval may have been issued incorrectly, but
the owner relied on it.
Develop language addressing good-faith reliance
on a County-issued approval and distinguish it
from construction without a permit.
Legal review required Moderate
Planning Director As-built surveys Ch. 38 and permit-review procedures A blanket as-built requirement for every addition or structure
may impose unnecessary cost.
Evaluate targeted verification where construction
is close to multiple setbacks, preferably before
footings or vertical construction create substantial
sunk cost.
Open policy question Moderate
Planning Director and Roads and
Bridges representative Current right-of-way documentation Chs. 26 and 38 Older plats may not reflect later right-of-way conveyances or
changes.
Continue coordinating with Roads and Bridges
when the current right-of-way cannot be
established from the recorded plat alone.
Existing procedure reaffirmed High
Planning Director Public-road-standard revisions Ch. 26 Kyle identified additional revisions to the public-road provisions
that were not fully reviewed during the session.
Incorporate the proposed changes into a later draft
for Commission review, provided they remain
within the comprehensive Chapter 26 assignment.
Follow-up drafting required Moderate
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 12
10. Consolidated Working Directions
The following matters were sufficiently clear to support continued drafting or structured follow -up, subject to normal legal and
technical review:
• Move private subdivision-road standards from §26-2 to Chapter 32.
• Keep County road-acceptance provisions in Chapter 26.
• Consolidate and coordinate road, private road, drive, and driveway definitions.
• Use a recognized SCDOT-based roadway-design framework for new private subdivision roads, subject to the recorded
qualification and later Commission review.
• Separate design requirements from construction requirements and require appropriate engineering certification.
• Establish an explicit County road-classification table and connect each classification to applicable design and study obligations.
• Expand and graduate traffic-study requirements while preserving developer responsibility for studies and attributable
improvements.
• Preserve the general policy that internal subdivision roads remain private, with selective County acceptance only for demonstrated
public benefit.
• Require clear recorded disclosure of private-road status and maintenance responsibility.
• Replace ambiguous grandfathering language with an objective date and trigger.
• Verify fire-access requirements before setting access-length or width rules.
• Require engineered bridge or culvert documentation and proof of required signage.
• Replace vague references to external standards with precise, edition-controlled citations.
• Clarify treatment of lawfully existing structures affected by later right-of-way changes.
11. Matters Not Yet Decided
CONTROL POINT
These items should not be represented as settled policy or incorporated as final numeric, technical, or legal standards until the identified
validation is complete.
• Whether 11 lots remains the correct trigger for fully engineered private-road standards.
• Whether intermediate road-design tiers should be established.
• The final local-minor, local-major, and collector traffic thresholds.
• Whether 400, 800, or approximately 1,200 trips should control any classification.
• The precise traffic-study trigger and required contents at each tier.
• The method for considering and assigning cumulative road-improvement costs.
• Whether the 20-foot minimum refers to pavement, drivable surface, fire lane, clear width, or right-of-way.
• The applicable SCDOT roadway-design-manual edition and whether the full construction specifications should be incorporated.
• The verified grandfathering date and the trigger for upgrading an existing access.
• The maximum permissible length of a driveway or drive and the exact fire-code provisions.
• The detailed criteria for County acceptance of a development road.
• The complete treatment of access roads serving property outside the original development.
• The legal treatment of structures approved incorrectly by prior County staff.
OCONEE COUNTY | SOUTH CAROLINA PLANNING & ZONING
WORKING ANALYSIS Planning Commission Workshop Two Page 13
12. Illustrative Numbers and Examples — Not Adopted
NOT ADOPTED
The workshop used numbers and projects to test the framework. Except where specifically described as a working floor, those examples
are not approved thresholds, factual findings, or drafting instructions.
• 32-foot road-envelope example.
• 40-, 50-, 100-, or 120-home examples.
• 400-, 800-, and approximately 1,200-trip classification examples.
• Ten daily trips per single-family residence as a general planning assumption.
• A 1,000-foot fire-access concern.
• Specific development sizes, corridor traffic estimates, and road-expansion assumptions used to test the proposed framework.
13. Decision Gate
CONTINUE WITH CONTROLS
Use this assessment as the working issue-and-direction register for Planning Commission Workshop Two. Proceed with the chapter
relocation, coordinated definitions, disclosure requirements, engineering-certification structure, private-maintenance language, and
general acceptance posture. Pause final drafting of numerical thresholds, the 20-foot dimensional provision, grandfathering, fire-access
requirements, road classifications, external-manual citations, and the 11-lot trigger until legal, engineering, fire-service, and ordinance-
history validation is complete.