July 2026
SDV-26-0001
Subdivision Variance
Pickens County, SC
Developed by
Parcel ID 4152-00-82-2162
Account No R0049960
Property
Address
132 HIDEAWAY DR
SUNSET
District A17-Shady Grove
Brief
Tax Description
S/SIDE HIDEAWAY DR PLAT
350/11A
(Note: Not to be used on legal
documents)
Account
Type
Vac Land
MH
Class n/a
Acreage 6.18
LEA Code 0007.9
Value $94,800
Ownership MITCHELL
FRANCES
132 HIDEAWAY
DR
SUNSET, SC
29685-0000
Documents
Date Price Doc Vacant or
Improved
8/4/2022 $1 2434 / /115 Vacant
6/30/2016 $1 1781/ / 350 Vacant
Date created: 6/17/2026
Last Data Uploaded: 6/17/2026 11:08:27 AM
295 ft
Overview
Legend
Parcels
Parcel Numbers
911 Address
Municipalities
Roads
61
CHAPTER 5 | LAND USE
DRAFT | APRIL 2022
Character Areas
Recreation and Open Space Community
Commercial Center
Agricultural Preservation Commercial
Gateway CorridorRural Places
Workplace Centers
Residential Growth
Institutional and
Educational
Urban Residential
SR 11 Scenic Corridor
Neighborhood
Commercial Center
July 2026
Text Amendments to UDSO
Solar Farms
1 | P a g e
Pickens County Solar Ordinance (6/2314/26 draft)
The intent of the Planning Commission is for this regulation to be incorporated into the
UDSO – Articles 3 and 12. The language/format below will most likely need to be
modified to conform to the requirements of the UDSO.
Pickens County, South Carolina adopts the following ordinance to regulate the
development and operation of solar energy systems as more fully defined below.
(1) A solar energy system is a system that captures and converts solar energy into
electricity, for the purpose of wholesale sales or for use in locations other than
solely the solar energy system property. Solar energy system includes, but is
not limited to, the following equipment and facilities contained within the fence
required by Section (8) and to be constructed by or on behalf of an electric
provider or independent power producer: photovoltaic solar panels; solar
inverters; access roads; distribution, collection, and feeder lines; wires and
cables; conduit; footings; foundations; towers; poles; crossarms; guy lines and
anchors; substations; interconnection or switching facilities; circuit breakers and
transformers; energy storage facilities; overhead and underground control;
communications and radio relay systems and telecommunications equipment;
utility lines and installations; generation tie lines; solar monitoring stations; and
accessory equipment and structures.
(2) This ordinance applies to solar energy systems. It does not apply to systems
that are used for the generation of electricity to be consumed at the location of
the system and for which the sale of electricity is limited to net metering
transactions with the public utility interconnected with the system. with:
(a) a total footprint of ten (10) acres or more of land,
(b) the proposed expansion of an existing solar energy system which, when
expanded, would have a total footprint of ten (10) acres or more of land, and
(2) (c) the proposed expansion by ten percent (10%) or more of an existing solar
energy system with an existing footprint of ten (10) acres or more.
(3) Site plans shall be prepared by a licensed land surveyor, landscape architect, or
engineer in the State of South Carolina.
(4) Solar energy systems shall be set back fifty (50) feet from adjoining property
lines and road rights of way and two hundred (200) feet from the nearest
residence, church, or school. Setback distances are to the fence and are
inclusive of the vegetation buffer.
(5) Facilities within a solar energy system shall not exceed fifteen (15) feet in height.
This provision shall not include the interconnection poles, substation equipment,
or other devices necessary for the electricity to be delivered to the public utility
station.
(6) Facilities within a solar energy system shall be screened from adjacent public
road rights of way, residences, churches, or schools with a vegetative buffer and
fence or wall with the following specifications:
2 | P a g e
(a) a vegetative buffer shall be installed surroundingadjacent to the perimeter of
the solar energy system;
(b) the vegetation shall be planted in two staggered rows at a spacing interval
between eight (8) feet and ten (10) feet on center and reach at least six (6)
feet in height over a three (3) year growing season and not less than fifteen
(15) feet in height at maturity or two (2) feet higher than the highest panel,
whichever is greater; and
(c) the vegetation shall include low lying vegetation to fill gaps between taller
vegetation.
(c)(d) The vegetative buffer shall be continuously maintained to ensure the
shielding of the solar energy system.
(75) All lighting shall be shielded or directed in a downward position to prevent
noxious glare. A light fixture is required at the ends of all turnarounds.
(68) Fencing shall be at least six (6) feet in height to secure the perimeter. The
fence shall always be secure. The fencing shall be constructed of heavy gauge
chain link with smaller mesh openings to prevent climbing and cutting. The top of
the fence shall include razor wire or barbed wire to enhance the security of the
solar energy system.
(79) A warning sign concerning voltage must be placed at the main gate to
include the address and name of the solar energy system operator and a twenty-
four (24) hour phone contact number for the solar energy system in case of an
emergency.
(810) Solar collectors shall be designed with anti-reflective coating to minimize
glare. Textured glass is optional. Mirrors are prohibited.
(911) A solar energy system decommissioning plan will be required as a
condition of approval and will include, at a minimum, the following:
(a) a legally binding agreement executed by the solar energy system owner and
operator (or both, if different parties), and the underlying property owner (if
different from the solar energy system owner and operator) that describes the
anticipated life of the solar energy system, the estimated decommissioning costs
in current dollars, and the anticipated manner in which the solar energy system
will be decommissioned;
(b) the agreement referenced in subpart (a) will include a performance guarantee
in the form of an irrevocable letter of credit in the amount of one hundred and
twenty-five percent (125%) of the estimated decommissioning cost. The estimate
shall be determined by an engineer licensed to practice in South Carolina. and
satisfactory with the Planning Commission.
3 | P a g e
(c) the agreement referenced in subpart (a) will provide that the obligations of all
the referenced parties shall be joint and several;
(d) the agreement referenced in subpart (a) must contain a commitment that as
part of the decommissioning process, the site will be restored to its pre-
development condition, including the removal of all equipment and related
facilities;
(e) the commitment in the agreement referenced in subpart (a) in the form of a
performance standard pursuant to which the solar energy system shall regularly
produce at least fifty percent (50%) of the rated production capability measured
on a monthly basis [there may be a more appropriate measurement period] and
should the system’s performance fall below that standard for a minimum of
twelvesix (612) consecutive months then the requirement to decommission as
provided in this section (911) shall be triggered. No later than March 31 of each
calendar year, the (name county agency) shall be provided a report of the
preceding year’s monthly electric production which shall be used in enforcing this
performance standard;
(f) the commitment in the agreement referenced in subpart (a) that
decommissioning will be required following a continuous six (6) month period in
which no electricity is generated by the solar energy system; and
(g) the commitment in the agreement referenced in subpart (a) that total
decommissioning will be completed no later than twelve (12) months after (i) the
determination under subpart (e) that the solar energy system failed to meet the
performance standard, or (ii) expiration of the six (6) month period referenced in
subpart (ef) above.
(h) prior to commencing the decommissioning process as provided in subpart (g)
the solar energy system owner, the solar energy system operator and/or the
underlying property owner can petition the Planning Commission for a waiver of
this requirement. The determination of the request for waiver will consider factors
such as unusual market conditions affecting power sales, required maintenance
outages and circumstances beyond the control of the solar energy system
operator. During the pendency of the Planning Commission’s consideration, as
well as any appeal of action by that body, the requirement to commence and
conclude the decommissioning process will be stayed.
(10) The Planning Commission’s authority under this ordinance is subject to the
requirements of the South Carolina Energy Security Act ( ___) , which provides
that siting and land use regulation of solar energy facilities with a capacity of …
megawatts is subject to the approval of the South Carolina Public Service
Commission. (this may have been repealed last year – we need the county
atty to advise)
Commented [RC1]: There could be unusual market
conditions, maintenance outage, etc. that could cause
no or reduced production beyond the system’s control.
4 | P a g e
(11) Upon receipt of a completed solar energy system plan by the Planning
Commission, a date shall be set for a public hearing to consider the plan for
approval.
July 2026
Text Amendments to UDSO
Commercial Lodging
Pickens County Ordinance
Commercial Lodging Facilities (New Article / Section)
§1. Purpose and Intent
The purpose of this ordinance is to regulate commercial lodging facilities in order to:
• Protect public health, safety, and welfare;
• Preserve rural character where applicable and environmental resources;
• Minimize adverse impacts on neighboring properties;
• Ensure adequate infrastructure, emergency access, and life safety;
• Provide clear standards for review, approval, and enforcement.
Commercial lodging facilities are recognized as potentially intensive land uses that require
heightened scrutiny due to transient occupancy, traffic generation, wastewater demands, and
public safety concerns.
§2. Definitions
Commercial Lodging Facility
Any use of land or structures where overnight, temporary, or short-term lodging is provided for
remuneration, including but not limited to:
• Tents, yurts, campers, RVs, travel trailers
• Cabins, cottages, tiny houses
• Rooms, inns, Hotels, Motels, lodges, timeshares
• Covered wagons, glamping pods, or similar structures
This definition includes facilities marketed as “eco-tourism,” “glamping,” or “experiential
lodging.”
Excluded Uses:
• Owner-occupied primary residences
• Long-term residential rentals exceeding 27 Consecutive days
• Non-commercial private camping by property owners and guests
• Campgrounds and RV parks where customers provide their own tents and RV’s
§3. Regulations
A. Conditional Use Required
Commercial lodging facilities shall be permitted only as a Conditional Use as specifically
authorized by the Unified Development Standards Ordinance (UDSO).
B. Minimum Parcel Size
• Minimum lot size: 5 acres
C. Prohibited Locations
Commercial lodging facilities are prohibited in the UDSO for locations such as:
• Floodways
• Conservation overlay districts unless expressly permitted
• Parcels without legal access to a public road
§4. Location and Setback Standards
A. Water Resource Protection
• No lodging unit, campsite, internal road, or common facility shall be located within 1,320
feet of:
o Rivers
o Lakes
o Reservoirs
o Jurisdictional wetlands
B. Property Line and Residential Buffers
• All structures and active use areas shall be set back a minimum of one hundred (100) feet
from all property lines. Along any property line not adjacent to a roadway, the required
setback area shall include a vegetated buffer meeting the standards of a Class 6 Buffer as
set forth in Article 8, Section 812, Figure 8.6 of the Pickens County Unified
Development Standards Ordinance (UDSO).
• Where the subject property is adjacent to residentially used property, a minimum fifty-
foot (50’) vegetated buffer shall be maintained within the required setback. Such buffer
shall include evergreen screening and shall be designed, installed, and maintained in
accordance with the applicable Class 6 Buffer standards in Article 8 of the Pickens
County UDSO.
§5. Density and Site Design
A. Maximum Density
• Maximum of 20 lodging units per acre
• Minimum of 150 square feet per lodging unit
B. Internal Circulation
• Internal Circulation.
All internal roads, drive aisles, and access routes serving the development shall be paved
and constructed in accordance with the applicable Pickens County roadway design and
pavement standards, including the standards incorporated by reference in Appendix B /
Chapter 32, Roads and Bridges, Roadway Design Standards and Policies.
• Internal circulation shall be designed to provide safe and adequate access for passenger
vehicles, service vehicles, emergency vehicles, and fire apparatus. Roadway width,
pavement section, subgrade preparation, curb and gutter, drainage, turning movements,
sight distance, and driveway/entrance design shall comply with the applicable County
road standards and shall be subject to review and approval by the County Engineer and
the County Fire Marshal.
• All internal roads shall also meet the County Fire Marshal’s requirements for emergency
vehicle access, including turning radius, vertical clearance, pavement load capacity, and
unobstructed access.
§6. Utilities and Environmental Health
A. Water and Sewer
1. Connection to public water and sewer is required where available.
2. Where unavailable:
o Centralized, SCDHEC-approved potable water system required.
o Centralized wastewater treatment required.
o Individual septic systems per unit are prohibited.
B. Stormwater ( As regulated in the UDSO)
• A professionally prepared stormwater management plan is required.
• No net increase in off-site runoff is permitted.
§7. Traffic, Noise, and Lighting Impacts
A. Traffic Impact Study
Per the USDO. County Engineer determines site access may be unsafe.
B. Noise Impact Study
• Establishes enforceable quiet hours (minimum 10:00 p.m. – 7:00 a.m.).
C. Lighting Impact Study as per the UDSO
§8. Operational Standards
A. Occupancy Limits
• No unit may be used as a permanent residence.
• Maximum stay: 180 days per guest per calendar year.
B
Refuse and Sanitation. As per the UDSO
§9. Public Notification and Hearing Requirements
A. Neighbor Notification
Applicant shall notify all property owners within 2,000 feet by certified mail at least 30 days
prior to the public hearing.
Notice shall include:
• Project description
• Parcel identification
• Date, time, and location of hearing
B. Publication
In addition to the minimum public notice requirements set forth in Article 12, Section
1205(d)(1) of the Pickens County Unified Development Standards Ordinance (UDSO)
• The first publication shall occur no less than twenty-one (21) days prior to the scheduled
public hearing. Each published notice shall state, at a minimum, the time, place, and
purpose of the public hearing, the general location of the subject property, and a brief
description of the request being considered.
• Nothing in this section shall be construed to reduce or replace any notice requirement
otherwise required by Article 12 of the Pickens County UDSO or applicable state law.
July 2026
Text Amendments to UDSO
Highway 8 Corridor
PICKENS COUNTY, SOUTH CAROLINA
HIGHWAY 8 RURAL PRESERVATION CORRIDOR OVERLAY DISTRICT
SECTION 1. TITLE
This Ordinance shall be known as the Highway 8 Rural Preservation Corridor Overlay District.
SECTION 2. AUTHORITY
This Overlay District is adopted pursuant to the South Carolina Local Government
Comprehensive Planning Enabling Act, S.C. Code Ann. Title 6, Chapter 29, and the Pickens
County Unified Development Standards Ordinance (UDSO).
The standards contained herein govern the timing, sequencing, environmental impacts,
transportation impacts, infrastructure capacity, compatibility of development, and preservation of
rural character within the Highway 8 Corridor while preserving lawful uses permitted by the
underlying zoning districts.
SECTION 3. FINDINGS
Pickens County finds that:
(1) Highway 8 is a significant transportation corridor serving rural communities, agricultural
lands, natural resources, recreational destinations, and established residential areas.
(2) The corridor is experiencing increasing development pressure that may adversely impact
transportation safety, roadway capacity, water quality, natural resources, public infrastructure,
and rural character.
(3) Incremental development reviewed on a parcel-by-parcel basis may create cumulative
impacts not adequately addressed through traditional zoning review.
(4) The preservation of scenic resources, open space, environmental features, watersheds,
agriculture, forest resources, and rural development patterns serves an important public purpose
and supports the goals of the One Pickens County Comprehensive Plan.
(5) Additional corridor standards are necessary to ensure future development occurs in a manner
compatible with the unique character, environmental resources, and infrastructure limitations of
the Highway 8 Corridor.
SECTION 4. PURPOSE AND INTENT
The purpose of this Overlay District is to:
(1) Protect public health, safety, and welfare;
(2) Preserve the rural character and scenic quality of the Highway 8 Corridor;
(3) Protect streams, watersheds, floodplains, wildlife habitat, agricultural lands, and other natural
resources;
(4) Promote safe and efficient transportation facilities;
(5) Coordinate development with available infrastructure and public services;
(6) Address cumulative impacts of development within the corridor;
(7) Encourage context-sensitive site design;
(8) Preserve scenic viewsheds and forest canopy;
(9) Implement the goals, objectives, and policies of the One Pickens County Comprehensive
Plan.
SECTION 5. APPLICABILITY
(A) This Overlay District shall apply to all property located within three (3) miles of either side
of the Highway 8 right-of-way within unincorporated Pickens County.
(B) The requirements of this Overlay District shall apply in addition to all applicable provisions
of the UDSO.
(C) Where provisions conflict, the more restrictive standard shall govern.
SECTION 6. DEVELOPMENT REVIEW
(A) Development requiring subdivision approval, major site plan approval, rezoning, conditional
use approval, special exception approval, or other discretionary approval under the UDSO shall
demonstrate compliance with this Overlay District.
(B) The Planning Commission may consider cumulative impacts on transportation facilities,
natural resources, watersheds, infrastructure systems, and surrounding land uses when reviewing
applications.
SECTION 7. SUBDIVISION STANDARDS
(A) No subdivision plat shall be approved or recorded unless found consistent with the standards
of this Overlay District and all applicable County regulations.
(B) Subdivision design shall encourage preservation of natural features, rural road frontage,
scenic resources, reduced clearcutting, forest canopy, and open space.
(C) New lots shall be configured to minimize unnecessary access points onto Highway 8.
(D) Residential Density and Minimum Lot Size
(1) All newly created residential lots within the Overlay District shall contain a minimum lot
area of one (1) acre unless a greater minimum lot size is required by the underlying zoning
district, septic requirements, watershed regulations, or other applicable laws.
(E) Open Space Requirements
(1) Any subdivision, conservation subdivision, open space development, planned development,
or residential development utilizing open space design principles shall permanently preserve a
minimum of forty-five percent (45%) of the gross tract area as protected open space.
(2) Required open space shall be contiguous to the greatest extent practicable and arranged to
preserve significant natural resources, wildlife habitat, stream corridors, ridgelines, mature
forests, agricultural lands, scenic viewsheds, and existing tree canopy.
(3) Open space areas shall be located along the perimeter boundaries of developments in order to
maintain rural character and provide meaningful separation between developed areas and
adjacent properties.
(4) Existing mature tree canopy and undisturbed forested areas shall be preserved to the greatest
extent practicable and incorporated into required open space whenever possible.
(5) The highest buffer standards otherwise authorized by the UDSO or Pickens County practices
shall apply to all open space developments within the Overlay District.
SECTION 8. LAND DISTURBANCE AND SITE DESIGN
(A) Development shall minimize land disturbance to the greatest extent.
(B) Existing tree canopy, mature vegetation, ridgelines, and natural landforms shall be preserved
to the greatest extent.
(C) Disturbed areas shall be stabilized in accordance with approved erosion and sediment control
plans and applicable state regulations.
(D) Development may be phased to ensure adequate stabilization and infrastructure capacity;
however, all phases of a proposed development shall be presented as part of the original
application in totality.
SECTION 9. STREAM AND WATER RESOURCE PROTECTION
(A) A minimum one hundred (100) foot vegetated or naturally undisturbed buffer shall be
maintained adjacent to perennial streams, rivers, lakes, and other jurisdictional waters identified
during development reviews.
(B) Existing native vegetation within required buffers shall be preserved to the greatest extent.
(C) Disturbance within required buffers shall be limited to approved crossings, utility
installations, stormwater facilities, and other activities authorized by applicable law.
(D) Watersheds, environmentally sensitive lands, groundwater recharge areas, wetlands, and
significant water resources shall be protected to the greatest extent.
SECTION 10. SCENIC CORRIDOR AND RURAL CHARACTER STANDARDS
Development shall be designed to preserve the visual quality and rural character of the Highway
8 Corridor.
(1) Existing vegetation along Highway 8 frontage shall be preserved.
(2) Scenic viewsheds shall be protected.
(3) Buildings shall be sited to minimize visual dominance from Highway 8.
(4) Parking areas shall be screened from public view.
(5) Outdoor storage areas shall be screened.
(6) Existing topography and natural landforms shall be incorporated into site design.
(7) Development intensity shall remain compatible with surrounding rural land uses.
(8) Infrastructure improvements shall be designed to minimize visual impacts and preserve the
scenic and rural character of the corridor.
(9) Utility extensions, roadway improvements, grading activities, and associated infrastructure
shall be limited to the minimum extent necessary to safely serve approved development while
maintaining the rural appearance of the corridor.
(10) Existing forest canopy, ridgelines, natural landforms, and scenic resources shall be
preserved to the greatest extent.
SECTION 11. ACCESS MANAGEMENT
(A) Access points shall be designed to maintain roadway safety and capacity.
(B) The County may require:
(1) Cross-access easements;
(2) Internal circulation connections;
(3) Consolidated access points;
(4) Access spacing consistent with County and South Carolina Department of Transportation
standards.
SECTION 12. TRAFFIC IMPACT REVIEW
(A) Traffic studies shall be required when development is anticipated to generate significant
traffic volumes, concentrated peak-hour traffic, or when cumulative corridor impacts are
identified. All studies shall require a minimum 5-mile radius of evaluation. All studies shall be
reviewed by the Planning Commission or the appropriate Pickens County advisory board.
Any development projected to generate more than two hundred fifty (250) daily vehicle trips, or
more than fifty (50) peak-hour vehicle trips shall be required to submit a Traffic Impact Analysis
prepared by a qualified transportation professional.
(C) Traffic Impact Analyses shall evaluate, at a minimum:
(1) Existing traffic conditions;
(2) Peak-hour traffic analysis;
(3) Capacity analysis;
(4) Circulation analysis;
(5) Corridor impact analysis;
(6) Origin and destination analysis;
(7) Safety impacts;
(8) Access management impacts;
(9) Emergency vehicle access;
(10) Pedestrian and bicycle accommodations;
(11) Existing approved developments, pending developments, and reasonably foreseeable
development within the Highway 8 Corridor to assess cumulative transportation impacts.
(D) SCHOOL AND INSTITUTIONAL TRAFFIC REVIEW
Any new public school, private school, charter school, educational campus, daycare campus,
college facility, or institutional use anticipated to generate more than one hundred (100) peak-
hour vehicle trips shall submit a School Traffic Impact Analysis.
The School Traffic Impact Analysis shall evaluate:
(1) Student drop-off and pick-up traffic operations;
(2) School bus operations and circulation;
(3) Parent and visitor queuing capacity on-site;
(4) Impacts to Highway 8 and adjacent intersections;
(5) Pedestrian and bicycle safety;
(6) Emergency access requirements;
(7) Future enrollment projections for a minimum ten-year planning horizon;
(8) Impacts to nearby residential roads and collector streets;
(9) Coordination with applicable school transportation providers.
(E) NO QUEUING ONTO HIGHWAY 8
No school, educational campus, institutional use, commercial use, or development subject to a
Traffic Impact Analysis shall be approved unless sufficient on-site stacking, circulation, and
vehicle storage areas are provided to prevent vehicle queues from extending onto Highway 8.
Applications shall demonstrate that anticipated peak traffic volumes can be accommodated on-
site without creating unsafe traffic conditions, roadway blockages, or interference with through
traffic.
(F) CORRIDOR LEVEL OF SERVICE STANDARD
Development shall not cause any Highway 8 corridor segment or study intersection to operate
below the County's adopted level-of-service standard unless mitigation measures are provided
sufficient to maintain acceptable operations.
(G) REQUIRED TRANSPORTATION IMPROVEMENTS
Where a Traffic Impact Analysis identifies unacceptable impacts to roadway safety, intersection
operations, traffic capacity, emergency access, or level of service, mitigation improvements shall
be completed or financially secured prior to issuance of a certificate of occupancy.
Mitigation measures may include, but shall not be limited to:
(1) Turn lanes;
(2) Acceleration lanes;
(3) Deceleration lanes;
(4) Intersection improvements;
(5) Signalization;
(6) Access management improvements;
(7) Roadway widening;
(8) Pedestrian or bicycle facilities;
(9) Other improvements recommended by the Traffic Impact Analysis and approved by SCDOT.
(H) TURN LANE REQUIREMENTS
Any development requiring a Traffic Impact Analysis that demonstrates turning movements
exceeding South Carolina Department of Transportation warrants shall provide acceleration
lanes, deceleration lanes, left-turn lanes, right-turn lanes, or other access improvements as
recommended by the Traffic Impact Analysis and approved by SCDOT.
(I) SCHOOL DISTRICT COORDINATION
Applications for new schools or developments generating substantial school enrollment impacts
shall be transmitted to the applicable school district for review and comment regarding
transportation operations, student capacity, bus routing, school access, and public safety
concerns.
The comments of the school district shall become part of the public record and may be
considered during review of the application.
(J) APPROVAL STANDARD
No approval shall be granted unless the applicant demonstrates that projected traffic volumes,
school operations, parent queuing, emergency access requirements, and cumulative corridor
impacts can be accommodated without creating unsafe conditions, unacceptable roadway
operations, or vehicle queues extending onto Highway 8.
SECTION 13. INFRASTRUCTURE CAPACITY REVIEW
Applicants shall demonstrate that adequate infrastructure capacity exists to serve proposed
development, including:
(1) Transportation facilities;
(2) Water availability;
(3) Wastewater treatment or septic suitability;
(4) Fire protection and emergency access;
(5) Stormwater management systems.
(6) School capacity and transportation system impacts where applicable.
The County may condition approvals upon completion of improvements necessary to maintain
acceptable service levels.
Infrastructure improvements should be designed to protect scenic resources, environmental
resources, watersheds, and corridor character to the greatest extent practicable.
SECTION 14. PHASED DEVELOPMENT
Where cumulative impacts exceed available infrastructure capacity, development approvals may
be phased to ensure infrastructure improvements occur concurrently with development demand.
All phases of development shall be disclosed during the initial application process.
Development applications shall identify affiliated ownership interests, adjoining property under
common ownership or control, and any reasonably foreseeable future phases.
SECTION 15. CORRIDOR COMPATIBILITY STANDARDS
(A) Industrial Uses
(1) New heavy industrial uses, manufacturing facilities, distribution centers, warehouses, bulk
storage facilities, mining operations, asphalt plants, concrete plants, and similar intensive
industrial uses shall be minimized within the Overlay District.
(2) Existing lawful industrial uses may continue in accordance with the nonconforming
provisions of the UDSO.
(B) Commercial Development
(1) Commercial development shall be designed and operated to minimize impacts on adjacent
properties, scenic resources, natural resources, watersheds, and transportation facilities.
(2) Building scale, site design, lighting, signage, landscaping, buffering, and access shall be
evaluated to ensure compatibility with the rural character of the Highway 8 Corridor.
(3) Where multiple development standards apply, the more restrictive standard shall govern.
(C) Lodging Uses
(1) Hotels, motels, resorts, commercial lodging establishments, and similar transient
accommodations shall require Planning Commission review.
(2) Such uses shall demonstrate compatibility with the rural character of the corridor and shall
provide enhanced buffering, landscaping, access management, and environmental protection
measures.
(3) All Lodging uses shall be subject to the more restrictive language of the UDSO or Pickens
County practices.
SECTION 15 (A). MULTI-FAMILY, TOWNHOME, CONDOMINIUM, AND HIGHER-
DENSITY RESIDENTIAL DEVELOPMENT
(1) Planning Commission Review Required
All apartment developments, condominium developments, townhome developments, multi-
family residential developments, and mixed residential developments shall require Planning
Commission review.
(3) Compatibility Analysis
Applicants shall submit a Corridor Compatibility Analysis demonstrating that the proposed
development is compatible with:
(a) Existing rural development patterns;
(b) Adjacent residential and agricultural land uses;
(c) Scenic corridor objectives;
(d) Transportation infrastructure capacity;
(e) Environmental resources and watersheds;
(f) The goals and policies of the One Pickens County Comprehensive Plan.
(4) Density Evaluation
The Planning Commission may consider overall density, development intensity, building
concentration, traffic generation, infrastructure demand, and compatibility with surrounding land
uses when evaluating applications.
(5) Open Space Requirement
A minimum of fifty percent (45%) of the gross tract area shall be preserved as permanent open
space for any apartment, condominium, townhome, or multi-family development.
Required open space shall prioritize:
(a) Existing forests;
(b) Agricultural lands;
(c) Stream corridors;
(d) Scenic viewsheds;
(e) Wildlife habitat;
(f) Natural resource areas.
(6) Building Design
Buildings shall be designed to minimize visual impacts from Highway 8, neighboring properties,
and all roads within the overlay corridor.
The County may evaluate:
(a) Building massing;
(b) Building orientation;
(c) Rooflines;
(d) Architectural character;
(e) Visual compatibility with rural surroundings.
(7) Traffic Standards
All apartment, condominium, townhome, and multi-family developments shall submit a Traffic
Impact Analysis regardless of trip generation.
Traffic studies shall include cumulative corridor impacts and evaluate emergency access,
intersection operations, and roadway safety.
(8) Infrastructure Capacity
Applicants shall demonstrate that adequate transportation facilities, water availability,
wastewater capacity, fire protection, emergency access, stormwater management facilities, and
public services exist to serve the proposed development.
(9) Phased Development
Phased residential developments shall disclose all anticipated phases and total build-out
conditions during the initial application process.
(10) Approval Standard
No apartment, condominium, townhome, or multi-family development shall be approved unless
the applicant demonstrates that the proposed development:
(a) Maintains the rural character of the Highway 8 Corridor;
(b) Preserves significant open space and natural resources;
(c) Does not create unacceptable transportation impacts;
(d) Does not exceed available infrastructure capacity;
(e) Is compatible with surrounding land uses;
(f) Advances the goals of the One Pickens County Comprehensive Plan.
SECTION 16. STANDARDS FOR APPROVAL CONSIDERATION
In determining whether an application should be approved, approved with conditions, or denied,
the Planning Commission or applicable Pickens County advisory board may consider:
(1) Compatibility with the rural character, scenic quality, and development pattern of the
Highway 8 Corridor;
(2) Consistency with the purpose and intent of this Overlay District;
(3) Preservation of vegetation, tree canopy, open space, agricultural lands, scenic viewsheds, and
natural features;
(4) Adequacy of setbacks, buffers, screening, landscaping, and site design measures;
(5) Potential impacts to streams, wetlands, floodplains, groundwater resources, wildlife habitat,
watersheds, and environmentally sensitive areas;
(6) Impacts related to traffic, roadway safety, noise, lighting, stormwater runoff, erosion, septic
capacity, outdoor storage, visual appearance, emergency access, and public safety;
(7) Availability of adequate infrastructure and public services;
(8) Safety and appropriateness of proposed access points;
(9) Compatibility with adjacent residential, agricultural, rural, conservation, recreational, and
resource-based land uses;
(10) Consistency with the One Pickens County Comprehensive Plan and any adopted corridor,
transportation, watershed, or small area plans.
(11) Minimization of infrastructure impacts and preservation of corridor character;
(12) Adequacy of school transportation facilities, student safety measures, parent queuing
capacity, school district comments, and impacts on local school operations.
(13) Impacts on agricultural lands, farming operations, timber resources, and rural land-use
patterns;
(14) Preservation of groundwater resources and long-term water availability;
SECTION 17. NONCONFORMING USES AND STRUCTURES
(A) Existing lawful uses, structures, lots, agricultural operations, forestry activities, and
improvements established prior to adoption of this Overlay District may continue in accordance
with the nonconforming provisions of the UDSO.
(B) Nothing in this Overlay District shall require removal or abandonment of a lawful existing
use.
(C) Expansion, redevelopment, or substantial modification of a nonconforming use may require
review under this section.
(D) Routine maintenance, repair, agricultural activity, forestry activity, and continued lawful
residential use shall not be prohibited and shall not be used to the benefit of development or
development agreements.
SECTION 18. ENFORCEMENT
(A) The County shall inspect properties, review approved plans, and investigate complaints to
determine compliance with this Overlay District.
(B) Failure to comply with this Overlay District, approved site plans, approved mitigation
measures, buffers, landscaping requirements, access requirements, lighting standards, or
conditions of approval shall constitute a violation of the UDSO.
(C) Violations may result in citations, civil penalties, stop work orders, permit suspension,
permit revocation, denial of future permits, withholding of certificates of occupancy, or other
remedies authorized by law.
(D) Property owners shall maintain required buffers, landscaping, screening, stormwater
facilities, erosion control measures, and access improvements.
SECTION 19. FINDINGS AND REFERENCE BASIS
(A) This Overlay District is supported by the Pickens County Unified Development Standards
Ordinance, which authorizes additional review standards for land uses and development
activities based upon their scale, intensity, location, and potential impacts.
(B) This Overlay District is further supported by the One Pickens County Comprehensive Plan,
which identifies the Highway 8 Corridor as an area containing significant rural, scenic,
environmental, agricultural, and community resources.
(C) The Comprehensive Plan supports preservation of rural character, protection of natural
resources, growth management, transportation planning, infrastructure coordination, land use
compatibility, and corridor-specific development standards.
(D) The standards contained herein are intended to implement those adopted policies through
objective review criteria designed to protect public health, safety, welfare, and quality of life
while allowing reasonable use of private property.
(E) The County finds that protection of watersheds, stream corridors, environmentally sensitive
lands, agricultural lands, forest resources, scenic viewsheds, and rural character serves an
important public purpose.
(F) Growth within the Highway 8 Corridor should occur in a manner that preserves the natural
and scenic resources that distinguish the corridor from more urbanized portions of the County.
(G) In the event future state legislation modifies annexation authority, growth management
authority, infrastructure planning requirements, or related land use regulations, this Overlay
District shall be interpreted and administered in a manner that remains consistent with its stated
purpose of preserving the rural, scenic, environmental, and agricultural character of the Highway
8 Corridor to the fullest extent permitted by law.
SECTION 20. SEVERABILITY
If any provision of this Ordinance is determined to be invalid by a court of competent
jurisdiction, such determination shall not affect the validity of the remaining provisions, which
shall remain in full force and effect.
SECTION 21. EFFECTIVE DATE
This Ordinance shall become effective upon third reading and approval by Pickens County
Council.