Pickens County · Pickens County · Planning Commission · meeting of Mar 9, 2026 · Agenda packets

Open the original document More from Pickens County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

March 2026 LU-26-0001and LU-26-0002 Speedway Multi-Use Park - Phase 3 and Phase 4 IMPACT February 26, 2026 To: Jonathan Cochrane Development Manger RealtyLink Development 201 Riverplace, Suite 400 Greenville, SC 29601 Subject: Greenville-Pickens Speedway Industrial Park – Phase 3 and Phase 4 Trip Generation Comparison Mr. Cochrane, Impact Designs was retained to perform a Trip Generation analysis based on the site plan prepared by RealtyLink, LLC (attached) to determine the trips generated by th e proposed development’s Phase 3 commercial land uses and Phase 4 industrial uses. The resulting projected site trips were compared with the commercial trips generated in the traffic impact study performed in January of 2025 to determine if the TIS is in need of adjustments. Project Description The proposed site is located on the north side of US 123, west of SC-124 in Pickens County, South Carolina. Full buildout of the Phase 3 commercial section is expected to consist of approximately 7,760 square feet of sit-down restaurant space, 3,500 square feet of fast-food restaurant space, a 5,860 square foot convenience store and 19,920 square feet of retail space. The pr eviously studied commercial space was expected to consist of 16,000 square feet of sit-down restaurant space, 6,000 square feet of fast-food restau rant space and a 4,760 square foot convenience store. As a part of the site development of these two spaces, a right-in/right-out access on SC-124 was introduced on the back side of the commercial outparc els. This access will be constructed with a right turn lane. Phase 3 Commercial Trip Generation Analysis The traffic generation potential of the proposed development was determin ed using the trip generation data published in the ITE Trip Generation Manual (11th Edition). Land use codes 822, 932, 934 and 945 were used to calculate the site trips. In the previously analyzed commercial space, land use codes 932, 934 and 945 were used to calculate the site trips. Table 1 summarizes the project trip generation for the proposed Phase 3 commercial development. Table 2 summarizes the project trip generation from the previously studied commercial space. Table 3 summarizes the differences between the previously studied site trips and th e proposed commercial site trips. Page | 2 Table 1 – Proposed Phase 3 Trip Generation Land Use ITE Code Size Traffic Volume Quantity Unit Daily AM PM Enter Exit Enter Exit High Turnover (Sit-Down) Restaurant 932 7.76 1,000 sq. ft. 832 41 33 43 27 Fast Food Restaurant w/ Drive Through Window 934 3.5 1,000 sq. ft. 1,636 80 77 60 55 Convenience Store/ Gas Station (9-15 VFP) 945 5.86 1,000 sq. ft. 4,105 166 166 160 160 Strip Retail Plaza (<40k) 822 19.92 1,000 sq. ft. 1,085 28 19 66 66 Total Trips 7,658 315 295 329 308 Table 2 – Previously Analyzed Commercial Trip Generation Land Use ITE Code Size Traffic Volume Quantity Unit Daily AM PM Enter Exit Enter Exit High Turnover (Sit-Down) Restaurant 932 16 1,000 sq. ft. 1,715 84 69 88 57 Fast Food Restaurant w/ Drive Through Window 934 6 1,000 sq. ft. 2,805 137 131 103 95 Convenience Store/ Gas Station (9-15 VFP) 945 4.76 1,000 sq. ft. 3,334 135 134 130 130 Total Trips 7,854 356 334 321 282 Table 3 – Commercial Use Trip Generation Comparison Source Traffic Volume Daily AM PM Enter Exit Enter Exit 2025 Traffic Impact Study 7,854 356 334 321 282 2026 Proposed Phase 3 7,658 315 295 329 308 Difference -196 (-2%) -41 (-12%) -39 (-12%) 8 (2%) 26 (9%) Page | 3 As seen in Table 3, the commercial trip generation previously studied in the 2025 traffic impact study is relatively similar to the proposed Phase 3 commerc ial trip generation. The Daily trip generation is expected to be 192 vehicles fewer than the previously ap proved commercial uses. The peak hour trips are expected to be a total of 80 trips (41 entering and 39 exiting) fewer in the AM and 34 trips (8 entering and 26 exiting) more in the PM. Although the PM trips slightly increase from the 2025 TIS, the AM trip s significantly decrease. Therefore, the overall impact of the proposed Phase 3 commercial uses is expected to be less than the original land uses. Phase 4 Industrial Trip Generation Analysis The traffic generation potential of the proposed Phase 4 industrial uses was determined using the trip generation data published in the ITE Trip Generation Manual (11th Edition). Land use code 150 was used to calculate the site trips. Table 4 summarizes the project trip generation for the proposed Phase 4 industrial use compared to the use studied in the 2025 TIS. Table 4 – Industrial Use Trip Generation Comparison Land Use ITE Code Size Traffic Volume Quantity Unit Daily AM PM Enter Exit Enter Exit Warehousing (2025 Traffic Impact Study) 150 384.58 1,000 sq. ft. 658 50 15 19 50 Warehousing (2026 Proposed Phase 4) 150 354.24 1,000 sq. ft. 606 46 14 18 46 Difference -52 (-8%) -4 (-8%) -1 (-7%) -1 (-5%) -4 (-8%) As indicated in Table 4, the proposed Phase 4 industrial use represents an 8% decrease in daily traffic with fewer AM and PM peak hour trips compared to the 2025 TIS. IMPACT August 29, 2024 Jonathan Cochrane Development Manager RealtyLink Development 201 Riverplace, Suite 400 Greenville, SC 29601 Phone: (803) 528-9798, Email: jcochrane@realtylinkdev.com Subject: Greenville-Pickens Speedway – Ph ase 1 Technical Traffic Memorandum Mr. Cochrane, The contents of this memorandum present the findings of a traffic impact analysis that was completed for the first phase of the proposed Greenville-Pickens Speedway redevelopment located in Pickens County, South Carolina. Site Location and Development Plan The proposed development is located on the north side of US 123, west of SC-124, in Pickens County, South Carolina. The site is proposed to consist of up to 4,141,530 square feet of industrial use; however, the first phase is expected to consist of 1,346,060 square feet of warehousing use. Access to the firs t phase of the project is proposed to be provided via a full movement connection to SC-124 and a fu ll movement connection to Crosswell Sc hool Road. The access plan for the full development has not yet been determined. Traffic Volumes Existing Volumes Existing weekday AM (7-9) and weekday PM (4-6) peak period traffic data was co llected at the study intersections on a typical weekday in December 2022. Refer to Table 1 below for a summary of the peak hour traffic volumes. Table 1 – Existing (2022) Traffic Volumes Intersection Peak Hour Eastbound Westbound Northbound Southbound L T R L T R L T R L T R US 123 & Crosswell School Road AM 3 1,892 - - 1,030 12 - - - 17 - 4 PM 8 1,333 - - 1,925 34 - - - 11 - 5 US 123 & SC-124 AM 367 1,542 - - 689 2 - - - - - 353 PM 404 940 - - 1,468 12 - - - - - 491 SC-124 & N. Fishtrap Road AM 16 350 3 49 331 8 2 49 72 97 157 20 PM 32 382 2 95 468 89 2 175 55 15 65 21 SC-124 & Access A AM - 369 - - 353 - - - - - - - PM - 416 - - 491 - - - - - - - Crosswell School Road & Access B AM - 21 - - 15 - - - - - - - PM - 16 - - 42 - - - - - - - Page | 2 Future Development Volumes Future volumes without the site develope d were estimated by growing the existing traffic volumes by 2% per year to the future build out year of 2026. Refer to Table 2 for a summary of the future no-build peak hour traffic volumes. Table 2 – Future No-Build (2026) Traffic Volumes Intersection Peak Hour Eastbound Westbound Northbound Southbound L T R L T R L T R L T R US 123 & Crosswell School Road AM 3 2,129 - - 1,159 14 - - - 19 - 5 PM 9 1,500 - - 2,167 38 - - - 12 - 6 US 123 & SC-124 AM 413 1,736 - - 775 2 - - - - - 397 PM 455 1,059 - - 1,652 14 - - - - - 552 SC-124 & N. Fishtrap Road AM 18 395 3 55 373 9 2 55 81 109 177 23 PM 36 430 2 107 527 100 2 197 62 17 73 24 SC-124 & Access A AM - 416 - - 398 - - - - - - - PM - 468 - - 553 - - - - - - - Crosswell School Road & Access B AM - 24 - - 17 - - - - - - - PM - 18 - - 47 - - - - - - - As mentioned previously, the first phase of the development is expected to consist of 1,346,060 square feet of warehousing use. Site traffic for the proposed buildings was estimated using the methodology found in the ITE Trip Generation Manual, 11th Edition. Refer to Table 3 for a summary of the collected data and the proposed site-generated traffic. Table 3 – Trip Generation Land Use (ITE Code) Density Vehicle Type Daily Traffic Peak Hour Trips (VPH) AM PM Enter Exit Enter Exit Warehousing (ITE Code 150) 1,346,060 sq. ft. All 2,165 143 42 53 135 Passenger Vehicles 1,431 129 29 32 116 Trucks 734 14 13 21 19 The development site trips were distributed on the existing ne twork based on the existing traffic counts. Refer to Tables 4 and 5 for a summary of the passenger vehicle and truck site tr affic. Table 6 summarizes the future build traffic volumes with the site developed. Page | 3 Table 4 – Proposed Site Trip Assignment (Passenger Vehicles) Intersection Peak Hour Eastbound Westbound Northbound Southbound L T R L T R L T R L T R US 123 & Crosswell School Road AM - 45 - - 3 - - - - - - 7 PM - 12 - - 12 - - - - - - 29 US 123 & SC-124 AM 45 - - - - 26 - - - - - 3 PM 12 - - - - 6 - - - - - 12 SC-124 & N. Fishtrap Road AM 1 4 11 - 19 - 20 - - - - 6 PM 6 17 40 - 5 - 5 - - - - 1 SC-124 & Access A AM 71 - - - - 45 - - - 16 - 3 PM 18 - - - - 11 - - - 63 - 12 Crosswell School Road & Access B AM 13 - - - - - - - - 7 - 3 PM 3 - - - - - - - - 29 - 12 Table 5 – Proposed Site Trip Assignment (Trucks) Intersection Peak Hour Eastbound Westbound Northbound Southbound L T R L T R L T R L T R US 123 & Crosswell School Road AM - 7 - - 7 - - - - - - - PM - 11 - - 10 - - - - - - - US 123 & SC-124 AM 7 - - - - 3 - - - - - 7 PM 11 - - - - 4 - - - - - 10 SC-124 & N. Fishtrap Road AM - 1 5 - 1 - 3 - - - - - PM - 2 8 - 2 - 4 - - - - - SC-124 & Access A AM 10 - - - - 4 - - - 6 - 7 PM 15 - - - - 6 - - - 10 - 10 Crosswell School Road & Access B AM - - - - - - - - - - - - PM - - - - - - - - - - - - Table 6 – Proposed Build (2026) Traffic Volumes Intersection Peak Hour Eastbound Westbound Northbound Southbound L T R L T R L T R L T R US 123 & Crosswell School Road AM 3 2,181 - - 1169 14 - - - 19 - 12 PM 9 1,523 - - 2,189 38 - - - 12 - 35 US 123 & SC-124 AM 465 1,736 - - 775 31 - - - - - 407 PM 478 1,059 - - 1,652 24 - - - - - 574 SC-124 & N. Fishtrap Road AM 19 400 19 55 393 9 25 55 81 109 177 29 PM 42 449 50 107 534 100 11 197 62 17 73 25 SC-124 & Access A AM 81 416 - - 398 49 - - - 22 - 10 PM 33 468 - - 553 17 - - - 73 - 22 Crosswell School Road & Access B AM 13 24 - - 17 0 - - - 7 - 3 PM 3 18 - - 47 0 - - - 29 - 12 Page | 4 Traffic Impact Analysis Turn Lane Warrant Analysis Based on the results of a turn lane warrant analysis, a left turn lane is warranted on SC-124 at Access A. Capacity Analysis Procedure Using the existing, no-build, and build traffic volumes, inte rsection analyses were conducted for the study intersections under Existing (2022) conditions, No-Build (2026) conditions, and Build (2026) c onditions. This analysis was conducted using the Transportation Research Board’s Highway Capacity Manual 6th Edition (HCM 6th Edition) methodologies of the Synchro, Version 11 software. Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational c onditions of the intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically represent poor, forced-flow (bumper-to-bum per) conditions with high vehicular de lays, and are generally considered undesirable. Table 7 summarizes the HCM 6 th Edition control delay thresholds associ ated with each LOS grade for signalized and unsignalized intersections. Table 7 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections Signalized Intersections Unsignalized Intersections LOS Control Delay per Vehicle (seconds) LOS Control Delay per Vehicle (seconds) A ≤ 10 A ≤ 10 B > 10 and ≤ 20 B > 10 and ≤ 15 C > 20 and ≤ 35 C > 15 and ≤ 25 D > 35 and ≤ 55 D > 25 and ≤ 35 E > 55 and ≤ 80 E > 35 and ≤ 50 F > 85 F > 50 Page | 5 Capacity Analysis Results The results of the capacity analysis for the study intersections under existing traffic control are summarized below in Table 8. Table 8 – Intersection Capacity Analysis Results Intersection Approach LOS (Delay in seconds per vehicle) Existing (2022) No-Build (2026) Build (2026) AM PM AM PM AM PM US 123 & Crosswell School Road EB B (10.9) C (21.7) B (11.7) D (26.9) B (11.8) D (27.5) WB - - - - - - SB F (141.4) F (591.3) F (304.0) F (1369.7) F (303.0) F (1062.1) US 123 & SC-124 EB B (13.3) F (115.4) C (16.3) F (279.3) C (19.0) F (339.1) WB - - - - - - SB* - - - - - - SC-124 & N. Fishtrap Road EB A (10.0) B (10.1) B (11.1) B (10.9) B (11.7) B (12.3) WB A (9.6) B (13.6) B (10.6) B (15.6) B (11.0) B (16.1) NB A (7.3) B (18.5) A (7.5) C (22.1) A (8.3) C (22.4) SB B (14.1) B (13.6) B (15.0) B (16.0) B (15.2) B (16.3) Overall B (10.5) B (13.4) B (11.5) B (15.3) B (11.9) B (15.9) SC-124 & Access A EB Analyzed under Build conditions only. A (8.9) A (9.9) WB - - SB C (23.1) E (35.4) Crosswell School Road & Access B EB Analyzed under Build conditions only. A (7.3) A (7.3) WB - - SB A (8.8) A (9.0) *The southbound approach is right-turn only under yield control with an acceleration lane. No delay is reported under Highway Capacity Manual methodology. Capacity analysis indicates that all approaches of the traffic signal at SC-124 and N. Fishtrap Road are expected to maintain their level of service from No-Build conditions to Build condi tions with all approaches operating at LOS C or better. The side street movements from Crosswell School Road onto US 123 are anticipated to experience high delays in both peak hours of all scenarios. Similarly, the eastbound left turn from US 123 onto SC-124 currently experiences high delay and would continue to do so in the future. 1 JANUARY 10, 2025 IMPACT DESIGNS, INC. Prepared by: Allen J. Reid, PE TRAFFIC IMPACT STUDY Greenville-Pickens Speedway Industrial Pickens County, South Carolina Greenville-Pickens Speedway Industrial | iv EXECUTIVE SUMMARY A traffic impact study was conducted for the proposed Greenville-Pickens Speedway Industrial development in accordance with SCDOT guidelines. The proposed development is located on the north side of US 123, west of SC-124 in Pickens County, South Carolina. Th e full buildout of the development is expected to consist of approximately 2.9 million square feet of industrial/warehous ing use, two 8,000-square-foot sit down restaurants, two 3,000-square-foot fast food r estaurants, and a 4,760-square-foot gas station to be completed in 2029. The study was determined through coordination with SCDOT and consists of the following intersections:  US 123 and Crosswell School Road  US 123 and SC-124  SC-124 and N. Fishtrap Road  SC-124 and Access A  Crosswell School Road and Access B  US 123 and Access C For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following scenarios:  Existing (2024) Conditions  No-Build (2029) Conditions  Build (2029) Conditions Traffic operations during the AM and PM peak hours we re modeled for each scenario. The results of each scenario were compared to determine impacts from background traffic growth and the proposed development. In the Build (2029) scenario with the proposed impr ovements, the new signalized intersections on US 123 are expected to operate at LOS C or better overall. Th e side street approaches at these intersections are expected to operate at LOS D in the AM peak hour and LOS E in the PM peak hour as the timings are designed to keep traffic on US 123 moving. All other intersections are anticipated to operate acceptably. Recommendations:  Construct a third site access on US 123 (Access C) and signalize the intersection,  Reroute Crosswell School Road to “T” into Access C north of US 123,  Construct three egress lanes on Access C: dual left turn lanes and a right turn lane  Construct a new dedicated left turn lane on US 123 at Access C,  Reroute SC-124 to “T” into US 123 approximately 900 feet west of the existing intersection and signalize the new intersection,  Construct three lanes on the reali gned SC-124 southbound approach at US 123: a left turn lane and dual right turn lanes,  Construct dual eastbound left turn lanes on US 123 at the realigned SC-124. Greenville-Pickens Speedway Industrial | 1 1. INTRODUCTION The purpose of this report is to summarize the traffi c impact study that was completed for the Greenville- Pickens Speedway Industrial development in Pickens County, South Carolina. The study was developed in accordance with SCDOT guidelines. This report summarizes the procedures and findings of the traffic impact study. 1.1. Project Summary The proposed development is located on the north side of US 123, west of SC-124 in Pickens County, South Carolina The full buildout of the development is expected to consist of approximately 2.9 million square feet of industrial/warehousing use and is to be completed in 2029. The first phase of the development consists of approximately 1.3 million square feet of industrial/warehousing use. The traffic impact of the first phase was analyzed in a technical memorandum dated August 29, 2024. The first phase is expected to be completed in 2026. This traffic impact study analyzes the effects of th e additional traffic associated with the full buildout of the Greenville-Pickens Speedway Industrial development during the weekday AM (7:00 AM - 9:00 AM) and the weekday PM (4:00 PM - 6:00 PM) peak periods. The study area for the purpose of the analysis includes:  US 123 and Crosswell School Road  US 123 and SC-124  SC-124 and N. Fishtrap Road  SC-124 and Access A  Crosswell School Road and Access B  US 123 and Access C The proposed development is expected to be completed by the end of 2029. Therefore, 2029 was considered as the future year for the purpose of this analysis. Refer to Figures 1 and 2 for the site location and the conceptual site plan. Greenville-Pickens Speedway Industrial | 2 1.2. Existing Roadway Conditions The primary roadways within the study area include US 123, SC-124, N. Fishtrap Road, and Crosswell School Road. A summary of their existing characteristics is shown in Table 1. Table 1 – Study Area Summary Facility Name Route # Typical Cross Section Posted Speed Limit Maintained By 2023 AADT US 123 4-lane divided 55 MPH SCDOT 39,500 Old Easley Highway SC-124 2-lane undivided 35/45 MPH SCDOT 10,600 N. Fishtrap Road S-37 2-lane undivided 35 MPH SCDOT 3,400 Crosswell School Road N/A 2-lane undivided 35 MH Local No Data Refer to Figure 3 for an illustration of the existing geometry and traffic control at the study intersections. 1.3. No-Build Roadway Conditions The first phase of the Greenville-Pickens Speedway Industrial development will install the site drives, Access A and Access B, which are proposed to be used by the second phase. These drives were analyzed in all future scenarios, including under No-Build conditions. Refer to Figure 4 for an illustration of the new geometry. 1.4. Driveway Locations Direct access to the future development is proposed to be provided via a full movement access to SC-124 and a full movement access to Crosswell School Road. These two accesses are to be constructed as a part of the first phase of the development. With the full buildout , the development intends to construct a third full movement access to US 123 at the existing driveway location for the Upstate Fairgrounds and Greenville- Pickens Speedway. To do so, Crosswell School Road woul d be rerouted to “T” into this access north of US 123. Greenville-Pickens Speedway Industrial | 7 2. TRAFFIC VOLUME DEVELOPMENT 2.1. Existing Traffic Volumes Existing turning movement counts we re conducted at the study intersections in December 2022 during the AM (7:00 AM to 9:00 AM) peak period and the PM (4 :00 PM to 6:00 PM) peak period. To adjust these counts for the 2024 existing conditions analysis, the counts were grown at a rate of 3% per year. The Existing (2024) traffic volumes are illustrated in Figure 5. 2.2. Phase 1 Traffic Volumes As mentioned previously, the first phase of the deve lopment will include approx imately 1.3 million square feet of industrial/warehousing use. The traffic impact of this phase was analyzed in a technical memorandum dated August 29, 2024. The same trips calculated in the August 2024 memorandum were included as background traffic in the No-Build (2029) scenario. Re fer to Figures 6 through 9 for an illustration of the Phase 1 trip distributions and assignments at the study intersections. 2.3. Projected Traffic Volumes Based on SCDOT Average Annual Daily Traffic (AADT) volumes, daily traffic volumes in the study area have increased at an average annual rate of 3%. As a result, a 3% annual growth was applied to the 2022 counts to develop the No-Build (2029) volumes. This growth rate was applied to account for all background growth in the area without any adjacent and/or th e proposed developments. Refer to Figure 10 for an illustration of the No-Build (2029) traffic volumes at the study intersections. 2.4. Crosswell School Road Rerouted Traffic Volumes With the full buildout of the development, Crosswell Sc hool Road is intended to be rerouted to “T” into Access C. As such, the traffic going to and coming from Crosswell School Road via US 123 had to be rerouted through the new site access. Refer to Figure 11 for an illustration of the rerouted traffic volumes. 2.5. Proposed Development Traffic Volumes As mentioned previously, the full buildout of the devel opment is expected to consist of approximately 2.9 million square feet of industrial/warehousing use, tw o 8,000-square-foot sit down restaurants, two 3,000- square-foot fast food restaurants, and a 4,760-square-f oot gas station to be completed in 2029. The trip generation potential for the proposed development was estimated utilizing methodology contained within the ITE’s Trip Generation Manual, 11th Edition. Utilizing ITE data for ITE Codes 150, 932, 934, and 945, traffic volumes were generated for the weekday daily, the weekday AM peak hour, and the weekday PM peak hour. Refer to Table 2 for a summary of the trip generation potential of the proposed development. Greenville-Pickens Speedway Industrial | 8 Table 2 – Phase 2 Trip Generation ITE Land Use (Code) Density Independent Variable Daily Traffic AM Peak PM Peak Enter Exit Enter Exit Warehousing (ITE Code 150) 1,441 KSF 2,315 151 46 56 143 Trucks: 786 15 14 22 21 Passenger Vehicles: 1,529 136 32 34 122 High Turnover (Sit- Down) Restaurant (ITE Code 932) 16 KSF 1,715 84 69 88 57 Fast Food Restaurant with Drive Through Window (ITE Code 934) 6 KSF 2,805 137 131 103 95 Pass-By Trips [50% AM; 55% PM] 67 67 54 54 Convenience Store/Gas Station (VFP 9-15) (ITE Code 945) 4.76 KSF 3,334 135 134 130 130 Pass-By Trips [76% AM; 75% PM] 92 92 60 60 Internal Capture 28 28 100 100 Total Primary Peak Hour Trips 305 179 141 190 Traffic associated with the proposed development was distributed and assigned to the roadway network based upon existing travel patterns and are summarized below: Industrial Use – Passenger Vehicles  35% to/from the west via US 123  35% to/from the east via US 123  15% to/from the east via SC-124  10% to/from the west via Crosswell School Road  5% to/from the north via N. Fishtrap Road Industrial Use – Trucks  50% to/from the west via US 123  50% to/from the east via US 123 Commercial Uses  45% to/from the west via US 123  35% to/from the east via US 123  15% to/from the east via SC-124  5% to/from the north via N. Fishtrap Road Because of the addition of the third site access with th e full buildout, the industrial trips from Phase 1 were redistributed with the Phase 2 industrial use traffic. Refer to Figures 12 through 19 for the site trip distributions and assignments. Greenville-Pickens Speedway Industrial | 9 2.6. Future Build Traffic Volumes The site generated traffic volumes were added to the No-Build (2029) traffic volumes to determine the Build (2029) volumes. The Build scenario volumes are illustrated in Figure 20. Greenville-Pickens Speedway Industrial | 26 3. TRAFFIC IMPACT ANALYSIS 3.1. Intersection Capacity Analysis Methodology Using the existing, no-build, and build traffic volum es, intersection analyses were conducted for the study intersections under Existing (2024) conditions, No-Build (2029) cond itions, and Build (2029) conditions. This analysis was conducted using th e Transportation Research Board’s Highway Capacity Manual (HCM 6th Edition) methodologies of the Synchro, Version 11 software. Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational conditions of the intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically re present poor, forced-flow (bumper-t o-bumper) conditions with high vehicular delays, and are generally considered undesirable. Table 3 summarizes the HCM 6th Edition control delay thresholds associated with each LOS grade for signalized and unsignalized intersections. Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections Signalized Intersections Unsignalized Intersections LOS Control Delay per Vehicle (seconds) LOS Control Delay per Vehicle (seconds) A ≤ 10 A ≤ 10 B > 10 and ≤ 20 B > 10 and ≤ 15 C > 20 and ≤ 35 C > 15 and ≤ 25 D > 35 and ≤ 55 D > 25 and ≤ 35 E > 55 and ≤ 80 E > 35 and ≤ 50 F > 85 F > 50 The results of the capacity analysis for the study intersections are summa rized in the sections below. Refer to Appendix C for the detailed capacity analysis reports and Appendix D for the queuing analysis results. Greenville-Pickens Speedway Industrial | 27 3.2. Existing Conditions Capacity Analysis The Existing (2024) scenario was analyzed based on the geometry and conditions illustrated in Figure 3. The results are summarized below in Table 4. Table 4 – Existing (2024) Capacity Analysis Results Intersections Approach LOS (Delay in seconds per vehicle) AM PM US 123 & Crosswell School Road EB B (10.9) C (21.7) WB - - SB F (141.4) F (591.3) US 123 & SC-124 EB B (13.3) F (115.4) WB - - SB (*) (*) SC-124 & N. Fishtrap Road EB B (10.0) B (10.1) WB A (9.6) B (13.6) NB A (7.3) B (18.5) SB B (14.1) B (13.6) Overall B (10.5) B (13.4) *HCM Methodology does not report delay for yield-controlled channelized right turns with an acceleration lane. The capacity analysis of the Existing (2024) scenario indicates that the volumes on US 123, particularly in the PM peak hour, allow for very few gaps for side st reet traffic and for the eas tbound left turn movement from US 123 to SC-124. During the evening peak period, the existing eastbound left turn lane at SC-124 does experience some queuing in excess of the available storage. All approaches at the signalized intersection of SC-124 at N. Fishtrap Road operate at LOS B or better in both peak hours. Greenville-Pickens Speedway Industrial | 28 3.3. No-Build Conditions Capacity Analysis The No-Build (2029) scenario was an alyzed based on the geometry and c onditions illustrated in Figure 4. The results are summarized below in Table 5 Table 5 – No-Build (2029) Capacity Analysis Results Intersections Approach LOS (Delay in seconds per vehicle) AM PM US 123 & Crosswell School Road EB B (12.6) E (35.3) WB - - SB F (616.1) F (2736.9) US 123 & SC-124 EB D (25.9) F (540.9) WB - - SB (*) (*) SC-124 & N. Fishtrap Road EB B (12.6) B (13.2) WB B (11.8) B (18.5) NB A (9.0) C (24.9) SB B (16.6) C (20.7) Overall B (12.8) B (18.0) SC-124 & Access A EB A (9.0) B (10.2) WB - - SB C (24.9) E (43.3) Crosswell School Road & Access B EB A (7.3) A (7.3) WB - - SB A (8.8) A (9.0) *HCM Methodology does not report delay for yield-controlled channelized right turns with an acceleration lane. Similar to the Existing (2024) analysis, the No-Build (2029) capacity analysis indicates that the volumes on US 123, particularly in the PM peak hour, allow for very few gaps for side street traffic and for the eastbound left turn movement from US 123 to SC-124. The b ackground growth and the addition of the Phase 1 site traffic are expected to increase delay at the intersections along US 123. All approaches at the signalized intersection of SC-124 at N. Fishtrap Road are anticipated to operate at LOS C or better in both peak hours. Greenville-Pickens Speedway Industrial | 29 3.4. Build Conditions Capacity Analysis The Build (2029) scenario was analyzed with the following improvements:  Construct a third site access on US 123 (Access C) and signalize the intersection,  Reroute Crosswell School Road to “T” into Access C north of US 123,  Construct three egress lanes on Access C: dual left turn lanes and a right turn lane  Construct a new dedicated left turn lane on US 123 at Access C,  Reroute SC-124 to “T” into US 123 approximately 900 feet west of the existing intersection and signalize the new intersection,  Construct three lanes on the reali gned SC-124 southbound approach at US 123: a left turn lane and dual right turn lanes, and  Construct dual eastbound left turn lanes on US 123 at the realigned SC-124. The results are summarized below in Table 6 Greenville-Pickens Speedway Industrial | 30 Table 6 – Build (2029) Capacity Analysis Results Intersections Approach LOS (Delay in seconds per vehicle) AM PM US 123 & SC-124 EB B (11.9) B (19.8) WB B (10.3) C (29.8) SB D (40.1) E (68.2) Overall B (15.0) C (31.8) SC-124 & N. Fishtrap Road EB B (12.7) B (12.6) WB B (13.1) B (18.6) NB A (8.6) C (25.6) SB B (17.2) B (17.6) Overall B (13.5) B (17.7) SC-124 & Access A EB A (8.9) B (10.1) WB - - SB C (16.4) C (19.7) Crosswell School Road & Access B EB A (7.3) A (7.3) WB - - SB A (8.4) A (8.6) US 123 & Access C EB B (12.2) B (10.4) WB A (7.1) B (19.9) SB D (45.3) E (77.8) Overall B (13.3) C (20.7) With the proposed improvements detailed above, the new signalized intersections on US 123 are expected to operate at LOS C or better overall. The side street a pproaches at these intersections are expected to operate at LOS D in the AM peak hour and LOS E in the PM p eak hour as the timings are designed to keep traffic on US 123 moving. All approaches at the signalized inte rsection of SC-124 at N. Fishtrap Ro ad are anticipated to continue to operate at LOS C or better in both peak hours. At the unsignalized site access intersections, all appro aches are expected to operate at LOS C or better in both peak hours. Figure 21 shows the proposed lane configurations and traffic control for the Build conditions. Greenville-Pickens Speedway Industrial | 32 4. SUMMARY OF FINDINGS A traffic impact study was conducted for the proposed Greenville-Pickens Speedway Industrial development in accordance with SCDOT guidelines. The proposed development is located on the north side of US 123, west of SC-124 in Pickens County, South Carolina. Th e full buildout of the development is expected to consist of approximately 2.9 million square feet of industrial/warehous ing use, two 8,000-square-foot sit down restaurants, two 3,000-square-foot fast food r estaurants, and a 4,760-square-foot gas station to be completed in 2029. The study was determined through coordination with SCDOT and consists of the following intersections:  US 123 and Crosswell School Road  US 123 and SC-124  SC-124 and N. Fishtrap Road  SC-124 and Access A  Crosswell School Road and Access B  US 123 and Access C For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following scenarios:  Existing (2024) Conditions  No-Build (2029) Conditions  Build (2029) Conditions Traffic operations during the AM and PM peak hours we re modeled for each scenario. The results of each scenario were compared to determine impacts from background traffic growth and the proposed development. In the Build (2029) scenario with the proposed impr ovements, the new signalized intersections on US 123 are expected to operate at LOS C or better overall. Th e side street approaches at these intersections are expected to operate at LOS D in the AM peak hour and LOS E in the PM peak hour as the timings are designed to keep traffic on US 123 moving. All other intersections are anticipated to operate acceptably. Recommendations:  Construct a third site access on US 123 (Access C) and signalize the intersection,  Reroute Crosswell School Road to “T” into Access C north of US 123,  Construct three egress lanes on Access C: dual left turn lanes and a right turn lane  Construct a new dedicated left turn lane on US 123 at Access C,  Reroute SC-124 to “T” into US 123 approximately 900 feet west of the existing intersection and signalize the new intersection,  Construct three lanes on the reali gned SC-124 southbound approach at US 123: a left turn lane and dual right turn lanes,  Construct dual eastbound left turn lanes on US 123 at the realigned SC-124. March 2026 LU-26-0003 Speedway Multi-Use Park - Phase 5 1 FEBRUARY 27, 2026 IMPACT DESIGNS, INC. Prepared by: Allen J. Reid, PE TRAFFIC IMPACT ANALYSIS Greenville Pickens Speedway Flex Pickens County, South Carolina Greenville Pickens Speedway Flex |iv EXECUTIVE SUMMARY A traffic impact study was conducted for the proposed Greenville Pickens Speedway Flex development in accordance with SCDOT guidelines. The proposed development is located on both sides of SC 124, west of Fishtrap Road, in Pickens County, South Carolina. The nor th site of the development is expected to consist of up to 1,233,300 sq. ft. of warehousing, and the south s ite is expected to consist of up to 219,088 sq. ft. of flex industrial use. The development is anticipated to be constructed by 2029. Access to the site is to be provided via two full movement accesses on SC 124 a nd three full movement accesses on Fishtrap Road – two north of SC 124 and one south of SC 124. The study was determined through coordination with SCDOT and consists of the following intersections:  US 123 and SC 124  US 123 and Fishtrap Road  SC 124 and Fishtrap Road  SC 124 and Access A  SC 124 and Access B  Fishtrap Road and Access C  Fishtrap Road and Access D  Fishtrap Road and Access E For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following scenarios:  Existing (2025) Conditions  No-Build (2029) Conditions  Build (2029) Conditions Traffic operations during the AM and PM peak hours we re modeled for each scenario. The results of each scenario were compared to determine impacts from background traffic growth and the proposed development. Recommendations:  Construct a southbound left turn lane on Fishtrap Road at US 123 with 180 feet of storage and appropriate taper. Greenville Pickens Speedway Flex |1 1. INTRODUCTION The purpose of this report is to summarize the traffic impact analysis that was completed for the proposed Greenville Pickens Speedway Flex development in Pickens County, South Carolina. The study was developed in accordance with SCDOT guidelines. The pur pose of the study is to determine the potential impact to the surrounding transportation system cause d by the traffic generated by the development. This report summarizes the procedures and findings of the traffic impact study. 1.1. Project Summary The proposed development is located on both sides of SC 124, west of Fishtrap Road, in Pickens County, South Carolina. The north site of th e development is expected to cons ist of up to 1,233,300 sq. ft. of warehousing, and the south site is expe cted to consist of up to 219,088 sq. ft. of flex industrial use. The development is anticipated to be c onstructed by 2029. This traffic impact study analyzes the effects of the additional traffic associated with the proposed devel opment during the weekday AM (7:00 AM - 9:00 AM) and the weekday PM (4:00 PM - 6:00 PM) peak periods. The study area for the purpose of the analysis includes:  US 123 and SC 124  US 123 and Fishtrap Road  SC 124 and Fishtrap Road  SC 124 and Access A  SC 124 and Access B  Fishtrap Road and Access C  Fishtrap Road and Access D  Fishtrap Road and Access E Refer to Figures 1 and 2 for the site location and the conceptual site plan. For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following scenarios:  Existing (2025) Conditions  No-Build (2029) Conditions  Build (2029) Conditions 1.2. Existing Roadway Conditions The primary roadway within the study area are US 17, Ocean Isle Beach Road SW, and Old Georgetown Road, SW. A summary of its existing characteristics is shown in Table 1. Greenville Pickens Speedway Flex |2 Table 1 – Study Area Summary Facility Name Route # Typical Cross Section Posted Speed Limit Maintained By 2024 AADT US 123 4-lane divided 45 MPH SCDOT 23,400 SC 124 2-lane undivided 35 MPH SCDOT 10,200 Fishtrap Road S-37 2-lane undivided 35 MPH SCDOT 3,200 Refer to Figure 4 for an illustration of the existing lane geometry and traffic control at the study intersections. 1.3. No-Build Roadway Conditions There adjacent Greenville Pickens Speedway Industrial s ite is responsible for making improvements to the road network. For the purposes of this analysis, these background improvements were considered to be complete in the 2029 analysis year. Refer to Figure 5 for an illustration of the No-Build scenario lane configuration. 1.4. Driveway Location Access to the site is to be provided via two full movement accesses on SC 124 and three full movement accesses on Fishtrap Road – two north of SC 124 and one south of SC 124. Greenville Pickens Speedway Flex |8 2. TRAFFIC VOLUME DEVELOPMENT 2.1. Existing Traffic Volumes Existing turning movement counts were conducted at the intersections during the weekday AM (7:00 AM to 9:00 AM) and weekday PM (4:00 PM to 6:00 PM) peak periods in May of 2025. The existing (2025) traffic volumes are illustrated in Figure 6. Refer to Appendix A for a copy of the raw traffic count data. 2.2. Adjacent Development Traffic Volumes The adjacent Greenville Pickens Speedway Industrial deve lopment, which is located north of US 123 and west of Fishtrap Road, is anticipated to consist of approximately 2.9 million sq. ft. of industrial/warehousing use, two 8,000 sq. ft. sit down restaurants, two 3,000 sq. ft. fast food restaurants, and 4,760 sq. ft. gas station according to the TIS. For the purposes of this analysis , it was assumed that the development would be fully built and occupied prior to or concurrent with the Flex industrial site. The expected traffic and required improvements to the network were included in all future scenarios of this analysis. Refer to Figure 7 for an illustration of the adjacent development volumes on the study network. 2.3. Projected Traffic Volumes Based on historical SCDOT traffic, volumes in the study area have increased at an average rate of 1% per year. To reflect continued growth, a 1% annual growth was applied to the 2025 counts to project traffic volumes for the future year (2029). This growth rate was applied to account for all background growth in the area without any adjacent and/or the proposed developments. Refer to Figure 8 for an illustration of the No- Build (2029) traffic volumes. 2.4. Proposed Development Traffic Volumes As mentioned previously, the north site of the developm ent is expected to consist of up to 1,233,300 sq. ft. of warehousing, and the south site is expected to consist of up to 219,088 sq. ft. of flex industrial use. The flex industrial use was analyzed as 80% warehousing u se and 20% office use. The trip generation potential for the development was estimated utilizi ng methodology contained within the ITE’s Trip Generation Manual, 12th Edition. Utilizing ITE equations for ITE C odes 150 and 710 traffic volumes were generated for the weekday daily, the weekday AM peak hour, a nd the weekday PM peak hour. Refer to Table 2 for a summary of the trip generation potential of the proposed development. Greenville Pickens Speedway Flex |9 Table 2 – Trip Generation Land Use ITE Code Size Vehicle Type Traffic Volume Quantity Unit Daily AM PM Enter Exit Enter Exit North Site Warehousing 150 1,233.30 KSF All 1,702 114 34 52 133 Pass. Vehicles 1,172 101 22 39 121 Trucks 530 13 12 13 12 South Site Warehousing (80% of GFA) 150 175.27 KSF All 242 16 5 7 19 Pass. Vehicles 167 14 3 5 17 Trucks 75 2 2 2 2 General Office Building (20% of GFA) 710 43.82 KSF All 479 61 8 12 63 Total South Site Trips 721 77 13 19 82 Total Project Trips 2,423 191 47 71 215 Site traffic associated with the proposed developmen t was distributed and assigned to the roadway network based upon existing travel patterns and are summarized below: Passenger Vehicles  35% to/from the west via US 123  35% to/from the east via US 123  15% to/from the north via Fishtrap Road  15% to/from the east via SC 124 Trucks  50% to/from the west via US 123  35% to/from the east via US 123  15% to/from the east via SC 124 Refer to Figures 9 through 16 for illustrations of the s ite trip distributions and assignments for the proposed development. 2.5. Future Build Traffic Volumes The site generated traffic volumes were added to the No-Build traffic volumes to determine the Build traffic volumes. The Build (2029) volumes are illustrated in Figure 17. Greenville Pickens Speedway Flex |22 3. TRAFFIC IMPACT ANALYSIS 3.1. Turn Lane Analysis A turn lane analysis was conducted for the site acce sses utilizing the Build (2029) volumes. Based on build out volumes, no turn lanes are warranted at the site access points. Refer to Appendix B for the turn lane warrant charts with the volumes graphed. 3.2. Intersection LOS Analysis Using the existing, no-build, and build traffic volum es, intersection analyses were conducted for the study intersections under Existing (2025) conditions, No-Build (2029) cond itions, and Build (2029) conditions. This analysis was conducted using the Transportation Research Board’s Highway Capacity Manual 6 th Edition (HCM 6th Edition) methodologies of the Synchro, Version 12 software. Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational conditions of the intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically re present poor, forced-flow (bumper-t o-bumper) conditions with high vehicular delays, and are ge nerally considered undesirable. Table 3 summarizes the HCM 6th Edition and Sidra control delay thresholds associated with each LOS grade for signalized and unsignalized intersections. Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections Signalized Intersections Unsignalized Intersections LOS Control Delay per Vehicle (seconds) LOS Control Delay per Vehicle (seconds) A ≤ 10 A ≤ 10 B > 10 and ≤ 20 B > 10 and ≤ 15 C > 20 and ≤ 35 C > 15 and ≤ 25 D > 35 and ≤ 55 D > 25 and ≤ 35 E > 55 and ≤ 80 E > 35 and ≤ 50 F > 85 F > 50 Existing heavy vehicle percentages were utilized in the capacity analysis. The future heavy vehicle percentages were adjusted based on the truck trips added by the site. The results of the capacity analysis for the study intersections are summarized below. Greenville Pickens Speedway Flex |23 Table 4 – Intersection Capacity Analysis Results Intersections Approach LOS (Delay in seconds per vehicle) Existing (2025) No-Build (2029) Build (2029) Build Improved (2029) AM PM AM PM AM PM AM PM US 123 & SC 124 EB B (12.8) F (56.9) B (12.5) B (15.3) B (13.6) B (15.3) - - WB - - A (8.5) B (17.6) A (9.8) B (19.5) - - SB C (17.3) F (179.6) B (18.2) D (40.9) B (18.4) D (41.7) - - Overall - - B (12.1) B (19.8) B (13.2) C (21.2) - - US 123 & Fishtrap Road EB C (25.1) B (14.4) C (27.8) B (15.7) C (30.2) B (20.0) C (26.7) B (15.3) WB B (12.3) B (19.0) B (13.6) C (21.6) B (15.0) C (30.9) B (13.3) C (21.5) NB D (43.2) D (41.6) D (46.1) D (45.0) D (42.5) D (36.5) D (46.8) D (47.6) SB E (60.7) D (39.5) E (68.2) D (41.4) E (72.0) E (59.1) D (50.2) D (44.2) Overall C (26.5) C (20.9) C (28.6) C (22.8) C (29.9) C (30.4) C (26.6) C (23.5) SC 124 & Fishtrap Road EB B (11.1) A (9.9) B (11.7) B (10.3) B (12.5) B (11.4) - - WB B (10.3) B (12.7) B (11.4) B (13.5) B (12.5) B (14.4) - - NB B (10.6) B (19.3) B (11.1) C (20.6) B (12.8) C (22.0) - - SB B (15.5) B (14.6) B (16.1) B (15.4) B (16.8) B (17.1) - - Overall B (12.0) B (13.3) B (12.7) B (14.1) B (13.7) B (15.2) - - SC 124 & Access A EB - - - - A (8.4) A (8.5) - - WB - - - - A (8.3) A (8.3) - - NB - - - - C (16.5) C (15.3) - - SB - - - - C (15.5) C (17.5) - - SC 124 & Access B EB - - - - A (8.3) A (8.3) - - WB - - - - A (8.3) A (8.3) - - NB - - - - C (19.1) C (20.4) - - SB - - - - C (16.1) C (17.5) - - Fishtrap Road & Access C EB - - - - B (12.7) B (10.2) - - NB - - - - A (9.7) A (8.6) - - SB - - - - - - - - Fishtrap Road & Access D EB - - - - B (11.8) B (10.5) - - NB - - - - A (8.4) A (7.8) - - SB - - - - - - - - Fishtrap Road & Access E EB - - - - B (10.4) B (11.0) - - NB - - - - A (7.8) A (8.1) - - SB - - - - - - - - The capacity analysis indicates that all movements at the future signalized intersection of US 123 and SC 124 are expected to operate at LOS D or better. The Build operations are anticipated to be similar to the No- Build operations. Greenville Pickens Speedway Flex |24 At the signalized intersection of US 123 and Fishtrap Road, the southbound approach is expected to operate at LOS E in the AM peak hour in both the No-Build and Build scenarios. However, in the PM peak hour, the southbound approach is anticipated to drop from LOS D to LOS E with the addition of site traffic under Build conditions. As mitigation, it is recomm ended that a southbound left turn lane be constructed on Fishtrap Road. With this improvement, the signal is expected to operate similar to the No-Build scenario, as shown in the Build Improved results. All approaches at the signalized intersection of SC 124 and Fishtrap Road are expected to operate at LOS C or better. No approaches are anticipated to drop a level of service in the Build scenario. All approaches at the site access intersections are expected to operate at LOS C or better. Refer to Figure 18 for an illustration of the proposed lane configuration. Greenville Pickens Speedway Flex |26 4. SUMMARY OF FINDINGS AND RECOMMENDATIONS A traffic impact study was conducted for the proposed Greenville Pickens Speedway Flex development in accordance with SCDOT guidelines. The proposed development is located on both sides of SC 124, west of Fishtrap Road, in Pickens County, South Carolina. The nor th site of the development is expected to consist of up to 1,233,300 sq. ft. of warehousing, and the south s ite is expected to consist of up to 219,088 sq. ft. of flex industrial use. The development is anticipated to be constructed by 2029. Access to the site is to be provided via two full movement accesses on SC 124 a nd three full movement accesses on Fishtrap Road – two north of SC 124 and one south of SC 124. The study was determined through coordination with SCDOT and consists of the following intersections:  US 123 and SC 124  US 123 and Fishtrap Road  SC 124 and Fishtrap Road  SC 124 and Access A  SC 124 and Access B  Fishtrap Road and Access C  Fishtrap Road and Access D  Fishtrap Road and Access E For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following scenarios:  Existing (2025) Conditions  No-Build (2029) Conditions  Build (2029) Conditions Traffic operations during the AM and PM peak hours we re modeled for each scenario. The results of each scenario were compared to determine impacts from background traffic growth and the proposed development. Recommendations:  Construct a southbound left turn lane on Fishtrap Road at US 123 with 180 feet of storage and appropriate taper.

Source: Pickens County website. First collected Oct 15, 2026.