March 2026
LU-26-0001and
LU-26-0002
Speedway Multi-Use
Park - Phase 3 and
Phase 4
IMPACT
February 26, 2026
To:
Jonathan Cochrane
Development Manger
RealtyLink Development
201 Riverplace, Suite 400
Greenville, SC 29601
Subject: Greenville-Pickens Speedway Industrial Park – Phase 3 and Phase 4 Trip Generation Comparison
Mr. Cochrane,
Impact Designs was retained to perform a Trip Generation analysis based on the site plan prepared by RealtyLink,
LLC (attached) to determine the trips generated by th e proposed development’s Phase 3 commercial land uses
and Phase 4 industrial uses. The resulting projected site trips were compared with the commercial trips generated
in the traffic impact study performed in January of 2025 to determine if the TIS is in need of adjustments.
Project Description
The proposed site is located on the north side of US 123, west of SC-124 in Pickens County, South Carolina. Full
buildout of the Phase 3 commercial section is expected to consist of approximately 7,760 square feet of sit-down
restaurant space, 3,500 square feet of fast-food restaurant space, a 5,860 square foot convenience store and 19,920
square feet of retail space. The pr eviously studied commercial space was expected to consist of 16,000 square
feet of sit-down restaurant space, 6,000 square feet of fast-food restau rant space and a 4,760 square foot
convenience store. As a part of the site development of these two spaces, a right-in/right-out access on SC-124
was introduced on the back side of the commercial outparc els. This access will be constructed with a right turn
lane.
Phase 3 Commercial Trip Generation Analysis
The traffic generation potential of the proposed development was determin ed using the trip generation data
published in the ITE Trip Generation Manual (11th Edition). Land use codes 822, 932, 934 and 945 were used to
calculate the site trips. In the previously analyzed commercial space, land use codes 932, 934 and 945 were used
to calculate the site trips. Table 1 summarizes the project trip generation for the proposed Phase 3 commercial
development. Table 2 summarizes the project trip generation from the previously studied commercial space.
Table 3 summarizes the differences between the previously studied site trips and th e proposed commercial site
trips.
Page | 2
Table 1 – Proposed Phase 3 Trip Generation
Land Use ITE
Code
Size Traffic Volume
Quantity Unit Daily AM PM
Enter Exit Enter Exit
High Turnover (Sit-Down)
Restaurant 932 7.76 1,000
sq. ft. 832 41 33 43 27
Fast Food Restaurant w/
Drive Through Window 934 3.5 1,000
sq. ft. 1,636 80 77 60 55
Convenience Store/ Gas
Station (9-15 VFP) 945 5.86 1,000
sq. ft. 4,105 166 166 160 160
Strip Retail Plaza (<40k) 822 19.92 1,000
sq. ft. 1,085 28 19 66 66
Total Trips 7,658 315 295 329 308
Table 2 – Previously Analyzed Commercial Trip Generation
Land Use ITE
Code
Size Traffic Volume
Quantity Unit Daily AM PM
Enter Exit Enter Exit
High Turnover (Sit-Down)
Restaurant 932 16 1,000
sq. ft. 1,715 84 69 88 57
Fast Food Restaurant w/
Drive Through Window 934 6 1,000
sq. ft. 2,805 137 131 103 95
Convenience Store/ Gas
Station (9-15 VFP) 945 4.76 1,000
sq. ft. 3,334 135 134 130 130
Total Trips 7,854 356 334 321 282
Table 3 – Commercial Use Trip Generation Comparison
Source
Traffic Volume
Daily AM PM
Enter Exit Enter Exit
2025 Traffic
Impact Study 7,854 356 334 321 282
2026 Proposed
Phase 3 7,658 315 295 329 308
Difference -196
(-2%)
-41
(-12%)
-39
(-12%)
8
(2%)
26
(9%)
Page | 3
As seen in Table 3, the commercial trip generation previously studied in the 2025 traffic impact study is relatively
similar to the proposed Phase 3 commerc ial trip generation. The Daily trip generation is expected to be 192
vehicles fewer than the previously ap proved commercial uses. The peak hour trips are expected to be a total of
80 trips (41 entering and 39 exiting) fewer in the AM and 34 trips (8 entering and 26 exiting) more in the PM.
Although the PM trips slightly increase from the 2025 TIS, the AM trip s significantly decrease. Therefore, the
overall impact of the proposed Phase 3 commercial uses is expected to be less than the original land uses.
Phase 4 Industrial Trip Generation Analysis
The traffic generation potential of the proposed Phase 4 industrial uses was determined using the trip generation
data published in the ITE Trip Generation Manual (11th Edition). Land use code 150 was used to calculate the
site trips. Table 4 summarizes the project trip generation for the proposed Phase 4 industrial use compared to the
use studied in the 2025 TIS.
Table 4 – Industrial Use Trip Generation Comparison
Land Use ITE
Code
Size Traffic Volume
Quantity Unit Daily AM PM
Enter Exit Enter Exit
Warehousing
(2025 Traffic Impact Study) 150 384.58 1,000
sq. ft. 658 50 15 19 50
Warehousing
(2026 Proposed Phase 4) 150 354.24 1,000
sq. ft. 606 46 14 18 46
Difference -52 (-8%) -4 (-8%) -1 (-7%) -1 (-5%) -4 (-8%)
As indicated in Table 4, the proposed Phase 4 industrial use represents an 8% decrease in daily traffic with fewer
AM and PM peak hour trips compared to the 2025 TIS.
IMPACT
August 29, 2024
Jonathan Cochrane
Development Manager
RealtyLink Development
201 Riverplace, Suite 400
Greenville, SC 29601
Phone: (803) 528-9798, Email: jcochrane@realtylinkdev.com
Subject: Greenville-Pickens Speedway – Ph ase 1 Technical Traffic Memorandum
Mr. Cochrane,
The contents of this memorandum present the findings of a traffic impact analysis that was completed for the first
phase of the proposed Greenville-Pickens Speedway redevelopment located in Pickens County, South Carolina.
Site Location and Development Plan
The proposed development is located on the north side of US 123, west of SC-124, in Pickens County, South Carolina. The
site is proposed to consist of up to 4,141,530 square feet of industrial use; however, the first phase is expected to consist of
1,346,060 square feet of warehousing use. Access to the firs t phase of the project is proposed to be provided via a full
movement connection to SC-124 and a fu ll movement connection to Crosswell Sc hool Road. The access plan for the full
development has not yet been determined.
Traffic Volumes
Existing Volumes
Existing weekday AM (7-9) and weekday PM (4-6) peak period traffic data was co llected at the study intersections on a
typical weekday in December 2022. Refer to Table 1 below for a summary of the peak hour traffic volumes.
Table 1 – Existing (2022) Traffic Volumes
Intersection Peak
Hour
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
US 123 & Crosswell
School Road
AM 3 1,892 - - 1,030 12 - - - 17 - 4
PM 8 1,333 - - 1,925 34 - - - 11 - 5
US 123 & SC-124 AM 367 1,542 - - 689 2 - - - - - 353
PM 404 940 - - 1,468 12 - - - - - 491
SC-124 & N.
Fishtrap Road
AM 16 350 3 49 331 8 2 49 72 97 157 20
PM 32 382 2 95 468 89 2 175 55 15 65 21
SC-124 & Access A AM - 369 - - 353 - - - - - - -
PM - 416 - - 491 - - - - - - -
Crosswell School
Road & Access B
AM - 21 - - 15 - - - - - - -
PM - 16 - - 42 - - - - - - -
Page | 2
Future Development Volumes
Future volumes without the site develope d were estimated by growing the existing traffic volumes by 2% per year to the
future build out year of 2026. Refer to Table 2 for a summary of the future no-build peak hour traffic volumes.
Table 2 – Future No-Build (2026) Traffic Volumes
Intersection Peak
Hour
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
US 123 & Crosswell
School Road
AM 3 2,129 - - 1,159 14 - - - 19 - 5
PM 9 1,500 - - 2,167 38 - - - 12 - 6
US 123 & SC-124 AM 413 1,736 - - 775 2 - - - - - 397
PM 455 1,059 - - 1,652 14 - - - - - 552
SC-124 & N.
Fishtrap Road
AM 18 395 3 55 373 9 2 55 81 109 177 23
PM 36 430 2 107 527 100 2 197 62 17 73 24
SC-124 & Access A AM - 416 - - 398 - - - - - - -
PM - 468 - - 553 - - - - - - -
Crosswell School
Road & Access B
AM - 24 - - 17 - - - - - - -
PM - 18 - - 47 - - - - - - -
As mentioned previously, the first phase of the development is expected to consist of 1,346,060 square feet of warehousing
use. Site traffic for the proposed buildings was estimated using the methodology found in the ITE Trip Generation Manual,
11th Edition. Refer to Table 3 for a summary of the collected data and the proposed site-generated traffic.
Table 3 – Trip Generation
Land Use
(ITE Code) Density Vehicle Type Daily
Traffic
Peak Hour Trips (VPH)
AM PM
Enter Exit Enter Exit
Warehousing
(ITE Code 150)
1,346,060
sq. ft.
All 2,165 143 42 53 135
Passenger Vehicles 1,431 129 29 32 116
Trucks 734 14 13 21 19
The development site trips were distributed on the existing ne twork based on the existing traffic counts. Refer to Tables 4
and 5 for a summary of the passenger vehicle and truck site tr affic. Table 6 summarizes the future build traffic volumes
with the site developed.
Page | 3
Table 4 – Proposed Site Trip Assignment (Passenger Vehicles)
Intersection Peak
Hour
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
US 123 & Crosswell
School Road
AM - 45 - - 3 - - - - - - 7
PM - 12 - - 12 - - - - - - 29
US 123 & SC-124 AM 45 - - - - 26 - - - - - 3
PM 12 - - - - 6 - - - - - 12
SC-124 & N.
Fishtrap Road
AM 1 4 11 - 19 - 20 - - - - 6
PM 6 17 40 - 5 - 5 - - - - 1
SC-124 & Access A AM 71 - - - - 45 - - - 16 - 3
PM 18 - - - - 11 - - - 63 - 12
Crosswell School
Road & Access B
AM 13 - - - - - - - - 7 - 3
PM 3 - - - - - - - - 29 - 12
Table 5 – Proposed Site Trip Assignment (Trucks)
Intersection Peak
Hour
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
US 123 & Crosswell
School Road
AM - 7 - - 7 - - - - - - -
PM - 11 - - 10 - - - - - - -
US 123 & SC-124 AM 7 - - - - 3 - - - - - 7
PM 11 - - - - 4 - - - - - 10
SC-124 & N.
Fishtrap Road
AM - 1 5 - 1 - 3 - - - - -
PM - 2 8 - 2 - 4 - - - - -
SC-124 & Access A AM 10 - - - - 4 - - - 6 - 7
PM 15 - - - - 6 - - - 10 - 10
Crosswell School
Road & Access B
AM - - - - - - - - - - - -
PM - - - - - - - - - - - -
Table 6 – Proposed Build (2026) Traffic Volumes
Intersection Peak
Hour
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
US 123 & Crosswell
School Road
AM 3 2,181 - - 1169 14 - - - 19 - 12
PM 9 1,523 - - 2,189 38 - - - 12 - 35
US 123 & SC-124 AM 465 1,736 - - 775 31 - - - - - 407
PM 478 1,059 - - 1,652 24 - - - - - 574
SC-124 & N.
Fishtrap Road
AM 19 400 19 55 393 9 25 55 81 109 177 29
PM 42 449 50 107 534 100 11 197 62 17 73 25
SC-124 & Access A AM 81 416 - - 398 49 - - - 22 - 10
PM 33 468 - - 553 17 - - - 73 - 22
Crosswell School
Road & Access B
AM 13 24 - - 17 0 - - - 7 - 3
PM 3 18 - - 47 0 - - - 29 - 12
Page | 4
Traffic Impact Analysis
Turn Lane Warrant Analysis
Based on the results of a turn lane warrant analysis, a left turn lane is warranted on SC-124 at Access A.
Capacity Analysis Procedure
Using the existing, no-build, and build traffic volumes, inte rsection analyses were conducted for the study intersections
under Existing (2022) conditions, No-Build (2026) conditions, and Build (2026) c onditions. This analysis was conducted
using the Transportation Research Board’s Highway Capacity Manual 6th Edition (HCM 6th Edition) methodologies of the
Synchro, Version 11 software.
Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control
delay at the intersection and characterize the operational c onditions of the intersection traffic flow. LOS A operations
typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically
represent poor, forced-flow (bumper-to-bum per) conditions with high vehicular de lays, and are generally considered
undesirable. Table 7 summarizes the HCM 6 th Edition control delay thresholds associ ated with each LOS grade for
signalized and unsignalized intersections.
Table 7 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections
Signalized Intersections Unsignalized Intersections
LOS Control Delay per Vehicle
(seconds) LOS Control Delay per Vehicle
(seconds)
A ≤ 10 A ≤ 10
B > 10 and ≤ 20 B > 10 and ≤ 15
C > 20 and ≤ 35 C > 15 and ≤ 25
D > 35 and ≤ 55 D > 25 and ≤ 35
E > 55 and ≤ 80 E > 35 and ≤ 50
F > 85 F > 50
Page | 5
Capacity Analysis Results
The results of the capacity analysis for the study intersections under existing traffic control are summarized below in Table
8.
Table 8 – Intersection Capacity Analysis Results
Intersection Approach
LOS (Delay in seconds per vehicle)
Existing (2022) No-Build (2026) Build (2026)
AM PM AM PM AM PM
US 123 & Crosswell
School Road
EB B (10.9) C (21.7) B (11.7) D (26.9) B (11.8) D (27.5)
WB - - - - - -
SB F (141.4) F (591.3) F (304.0) F (1369.7) F (303.0) F (1062.1)
US 123 & SC-124
EB B (13.3) F (115.4) C (16.3) F (279.3) C (19.0) F (339.1)
WB - - - - - -
SB* - - - - - -
SC-124 & N.
Fishtrap Road
EB A (10.0) B (10.1) B (11.1) B (10.9) B (11.7) B (12.3)
WB A (9.6) B (13.6) B (10.6) B (15.6) B (11.0) B (16.1)
NB A (7.3) B (18.5) A (7.5) C (22.1) A (8.3) C (22.4)
SB B (14.1) B (13.6) B (15.0) B (16.0) B (15.2) B (16.3)
Overall B (10.5) B (13.4) B (11.5) B (15.3) B (11.9) B (15.9)
SC-124 & Access A
EB
Analyzed under Build conditions only.
A (8.9) A (9.9)
WB - -
SB C (23.1) E (35.4)
Crosswell School
Road & Access B
EB
Analyzed under Build conditions only.
A (7.3) A (7.3)
WB - -
SB A (8.8) A (9.0)
*The southbound approach is right-turn only under yield control with an acceleration lane. No delay is reported under Highway
Capacity Manual methodology.
Capacity analysis indicates that all approaches of the traffic signal at SC-124 and N. Fishtrap Road are expected to maintain
their level of service from No-Build conditions to Build condi tions with all approaches operating at LOS C or better. The
side street movements from Crosswell School Road onto US 123 are anticipated to experience high delays in both peak
hours of all scenarios. Similarly, the eastbound left turn from US 123 onto SC-124 currently experiences high delay and
would continue to do so in the future.
1
JANUARY 10, 2025
IMPACT DESIGNS, INC.
Prepared by: Allen J. Reid, PE
TRAFFIC IMPACT STUDY
Greenville-Pickens Speedway
Industrial
Pickens County, South Carolina
Greenville-Pickens Speedway Industrial | iv
EXECUTIVE SUMMARY
A traffic impact study was conducted for the proposed Greenville-Pickens Speedway Industrial development
in accordance with SCDOT guidelines. The proposed development is located on the north side of US 123,
west of SC-124 in Pickens County, South Carolina. Th e full buildout of the development is expected to
consist of approximately 2.9 million square feet of industrial/warehous ing use, two 8,000-square-foot sit
down restaurants, two 3,000-square-foot fast food r estaurants, and a 4,760-square-foot gas station to be
completed in 2029.
The study was determined through coordination with SCDOT and consists of the following intersections:
US 123 and Crosswell School Road
US 123 and SC-124
SC-124 and N. Fishtrap Road
SC-124 and Access A
Crosswell School Road and Access B
US 123 and Access C
For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following
scenarios:
Existing (2024) Conditions
No-Build (2029) Conditions
Build (2029) Conditions
Traffic operations during the AM and PM peak hours we re modeled for each scenario. The results of each
scenario were compared to determine impacts from background traffic growth and the proposed
development.
In the Build (2029) scenario with the proposed impr ovements, the new signalized intersections on US 123
are expected to operate at LOS C or better overall. Th e side street approaches at these intersections are
expected to operate at LOS D in the AM peak hour and LOS E in the PM peak hour as the timings are
designed to keep traffic on US 123 moving. All other intersections are anticipated to operate acceptably.
Recommendations:
Construct a third site access on US 123 (Access C) and signalize the intersection,
Reroute Crosswell School Road to “T” into Access C north of US 123,
Construct three egress lanes on Access C: dual left turn lanes and a right turn lane
Construct a new dedicated left turn lane on US 123 at Access C,
Reroute SC-124 to “T” into US 123 approximately 900 feet west of the existing intersection and
signalize the new intersection,
Construct three lanes on the reali gned SC-124 southbound approach at US 123: a left turn lane and
dual right turn lanes,
Construct dual eastbound left turn lanes on US 123 at the realigned SC-124.
Greenville-Pickens Speedway Industrial | 1
1. INTRODUCTION
The purpose of this report is to summarize the traffi c impact study that was completed for the Greenville-
Pickens Speedway Industrial development in Pickens County, South Carolina. The study was developed in
accordance with SCDOT guidelines. This report summarizes the procedures and findings of the traffic impact
study.
1.1. Project Summary
The proposed development is located on the north side of US 123, west of SC-124 in Pickens County, South
Carolina The full buildout of the development is expected to consist of approximately 2.9 million square feet
of industrial/warehousing use and is to be completed in 2029. The first phase of the development consists of
approximately 1.3 million square feet of industrial/warehousing use. The traffic impact of the first phase was
analyzed in a technical memorandum dated August 29, 2024. The first phase is expected to be completed in
2026. This traffic impact study analyzes the effects of th e additional traffic associated with the full buildout
of the Greenville-Pickens Speedway Industrial development during the weekday AM (7:00 AM - 9:00 AM)
and the weekday PM (4:00 PM - 6:00 PM) peak periods. The study area for the purpose of the analysis
includes:
US 123 and Crosswell School Road
US 123 and SC-124
SC-124 and N. Fishtrap Road
SC-124 and Access A
Crosswell School Road and Access B
US 123 and Access C
The proposed development is expected to be completed by the end of 2029. Therefore, 2029 was considered
as the future year for the purpose of this analysis. Refer to Figures 1 and 2 for the site location and the
conceptual site plan.
Greenville-Pickens Speedway Industrial | 2
1.2. Existing Roadway Conditions
The primary roadways within the study area include US 123, SC-124, N. Fishtrap Road, and Crosswell
School Road. A summary of their existing characteristics is shown in Table 1.
Table 1 – Study Area Summary
Facility Name Route # Typical Cross
Section
Posted
Speed
Limit
Maintained
By 2023 AADT
US 123 4-lane divided 55 MPH SCDOT 39,500
Old Easley Highway SC-124 2-lane undivided 35/45 MPH SCDOT 10,600
N. Fishtrap Road S-37 2-lane undivided 35 MPH SCDOT 3,400
Crosswell School Road N/A 2-lane undivided 35 MH Local No Data
Refer to Figure 3 for an illustration of the existing geometry and traffic control at the study intersections.
1.3. No-Build Roadway Conditions
The first phase of the Greenville-Pickens Speedway Industrial development will install the site drives, Access
A and Access B, which are proposed to be used by the second phase. These drives were analyzed in all future
scenarios, including under No-Build conditions. Refer to Figure 4 for an illustration of the new geometry.
1.4. Driveway Locations
Direct access to the future development is proposed to be provided via a full movement access to SC-124
and a full movement access to Crosswell School Road. These two accesses are to be constructed as a part of
the first phase of the development. With the full buildout , the development intends to construct a third full
movement access to US 123 at the existing driveway location for the Upstate Fairgrounds and Greenville-
Pickens Speedway. To do so, Crosswell School Road woul d be rerouted to “T” into this access north of US
123.
Greenville-Pickens Speedway Industrial | 7
2. TRAFFIC VOLUME DEVELOPMENT
2.1. Existing Traffic Volumes
Existing turning movement counts we re conducted at the study intersections in December 2022 during the
AM (7:00 AM to 9:00 AM) peak period and the PM (4 :00 PM to 6:00 PM) peak period. To adjust these
counts for the 2024 existing conditions analysis, the counts were grown at a rate of 3% per year. The Existing
(2024) traffic volumes are illustrated in Figure 5.
2.2. Phase 1 Traffic Volumes
As mentioned previously, the first phase of the deve lopment will include approx imately 1.3 million square
feet of industrial/warehousing use. The traffic impact of this phase was analyzed in a technical memorandum
dated August 29, 2024. The same trips calculated in the August 2024 memorandum were included as
background traffic in the No-Build (2029) scenario. Re fer to Figures 6 through 9 for an illustration of the
Phase 1 trip distributions and assignments at the study intersections.
2.3. Projected Traffic Volumes
Based on SCDOT Average Annual Daily Traffic (AADT) volumes, daily traffic volumes in the study area
have increased at an average annual rate of 3%. As a result, a 3% annual growth was applied to the 2022
counts to develop the No-Build (2029) volumes. This growth rate was applied to account for all background
growth in the area without any adjacent and/or th e proposed developments. Refer to Figure 10 for an
illustration of the No-Build (2029) traffic volumes at the study intersections.
2.4. Crosswell School Road Rerouted Traffic Volumes
With the full buildout of the development, Crosswell Sc hool Road is intended to be rerouted to “T” into
Access C. As such, the traffic going to and coming from Crosswell School Road via US 123 had to be
rerouted through the new site access. Refer to Figure 11 for an illustration of the rerouted traffic volumes.
2.5. Proposed Development Traffic Volumes
As mentioned previously, the full buildout of the devel opment is expected to consist of approximately 2.9
million square feet of industrial/warehousing use, tw o 8,000-square-foot sit down restaurants, two 3,000-
square-foot fast food restaurants, and a 4,760-square-f oot gas station to be completed in 2029. The trip
generation potential for the proposed development was estimated utilizing methodology contained within the
ITE’s Trip Generation Manual, 11th Edition. Utilizing ITE data for ITE Codes 150, 932, 934, and 945, traffic
volumes were generated for the weekday daily, the weekday AM peak hour, and the weekday PM peak hour.
Refer to Table 2 for a summary of the trip generation potential of the proposed development.
Greenville-Pickens Speedway Industrial | 8
Table 2 – Phase 2 Trip Generation
ITE Land Use (Code) Density Independent
Variable
Daily
Traffic
AM Peak PM Peak
Enter Exit Enter Exit
Warehousing
(ITE Code 150)
1,441 KSF 2,315 151 46 56 143
Trucks: 786 15 14 22 21
Passenger Vehicles: 1,529 136 32 34 122
High Turnover (Sit-
Down) Restaurant
(ITE Code 932)
16 KSF 1,715 84 69 88 57
Fast Food Restaurant
with Drive Through
Window
(ITE Code 934)
6 KSF 2,805 137 131 103 95
Pass-By Trips [50% AM; 55% PM] 67 67 54 54
Convenience Store/Gas
Station (VFP 9-15)
(ITE Code 945)
4.76 KSF 3,334 135 134 130 130
Pass-By Trips [76% AM; 75% PM] 92 92 60 60
Internal Capture 28 28 100 100
Total Primary Peak Hour Trips 305 179 141 190
Traffic associated with the proposed development was distributed and assigned to the roadway network based
upon existing travel patterns and are summarized below:
Industrial Use – Passenger Vehicles
35% to/from the west via US 123
35% to/from the east via US 123
15% to/from the east via SC-124
10% to/from the west via Crosswell School Road
5% to/from the north via N. Fishtrap Road
Industrial Use – Trucks
50% to/from the west via US 123
50% to/from the east via US 123
Commercial Uses
45% to/from the west via US 123
35% to/from the east via US 123
15% to/from the east via SC-124
5% to/from the north via N. Fishtrap Road
Because of the addition of the third site access with th e full buildout, the industrial trips from Phase 1 were
redistributed with the Phase 2 industrial use traffic. Refer to Figures 12 through 19 for the site trip
distributions and assignments.
Greenville-Pickens Speedway Industrial | 9
2.6. Future Build Traffic Volumes
The site generated traffic volumes were added to the No-Build (2029) traffic volumes to determine the Build
(2029) volumes. The Build scenario volumes are illustrated in Figure 20.
Greenville-Pickens Speedway Industrial | 26
3. TRAFFIC IMPACT ANALYSIS
3.1. Intersection Capacity Analysis Methodology
Using the existing, no-build, and build traffic volum es, intersection analyses were conducted for the study
intersections under Existing (2024) conditions, No-Build (2029) cond itions, and Build (2029) conditions.
This analysis was conducted using th e Transportation Research Board’s Highway Capacity Manual (HCM
6th Edition) methodologies of the Synchro, Version 11 software.
Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level
of control delay at the intersection and characterize the operational conditions of the intersection traffic flow.
LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays,
and LOS F operations typically re present poor, forced-flow (bumper-t o-bumper) conditions with high
vehicular delays, and are generally considered undesirable. Table 3 summarizes the HCM 6th Edition control
delay thresholds associated with each LOS grade for signalized and unsignalized intersections.
Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections
Signalized Intersections Unsignalized Intersections
LOS Control Delay per Vehicle
(seconds) LOS Control Delay per
Vehicle (seconds)
A ≤ 10 A ≤ 10
B > 10 and ≤ 20 B > 10 and ≤ 15
C > 20 and ≤ 35 C > 15 and ≤ 25
D > 35 and ≤ 55 D > 25 and ≤ 35
E > 55 and ≤ 80 E > 35 and ≤ 50
F > 85 F > 50
The results of the capacity analysis for the study intersections are summa rized in the sections below. Refer
to Appendix C for the detailed capacity analysis reports and Appendix D for the queuing analysis results.
Greenville-Pickens Speedway Industrial | 27
3.2. Existing Conditions Capacity Analysis
The Existing (2024) scenario was analyzed based on the geometry and conditions illustrated in Figure 3. The
results are summarized below in Table 4.
Table 4 – Existing (2024) Capacity Analysis Results
Intersections Approach
LOS (Delay in
seconds per vehicle)
AM PM
US 123 & Crosswell
School Road
EB B (10.9) C (21.7)
WB - -
SB F (141.4) F (591.3)
US 123 & SC-124
EB B (13.3) F (115.4)
WB - -
SB (*) (*)
SC-124 & N. Fishtrap
Road
EB B (10.0) B (10.1)
WB A (9.6) B (13.6)
NB A (7.3) B (18.5)
SB B (14.1) B (13.6)
Overall B (10.5) B (13.4)
*HCM Methodology does not report delay for yield-controlled channelized
right turns with an acceleration lane.
The capacity analysis of the Existing (2024) scenario indicates that the volumes on US 123, particularly in
the PM peak hour, allow for very few gaps for side st reet traffic and for the eas tbound left turn movement
from US 123 to SC-124. During the evening peak period, the existing eastbound left turn lane at SC-124 does
experience some queuing in excess of the available storage.
All approaches at the signalized intersection of SC-124 at N. Fishtrap Road operate at LOS B or better in
both peak hours.
Greenville-Pickens Speedway Industrial | 28
3.3. No-Build Conditions Capacity Analysis
The No-Build (2029) scenario was an alyzed based on the geometry and c onditions illustrated in Figure 4.
The results are summarized below in Table 5
Table 5 – No-Build (2029) Capacity Analysis Results
Intersections Approach
LOS (Delay in
seconds per vehicle)
AM PM
US 123 & Crosswell
School Road
EB B (12.6) E (35.3)
WB - -
SB F (616.1) F (2736.9)
US 123 & SC-124
EB D (25.9) F (540.9)
WB - -
SB (*) (*)
SC-124 & N. Fishtrap
Road
EB B (12.6) B (13.2)
WB B (11.8) B (18.5)
NB A (9.0) C (24.9)
SB B (16.6) C (20.7)
Overall B (12.8) B (18.0)
SC-124 & Access A
EB A (9.0) B (10.2)
WB - -
SB C (24.9) E (43.3)
Crosswell School
Road & Access B
EB A (7.3) A (7.3)
WB - -
SB A (8.8) A (9.0)
*HCM Methodology does not report delay for yield-controlled channelized
right turns with an acceleration lane.
Similar to the Existing (2024) analysis, the No-Build (2029) capacity analysis indicates that the volumes on
US 123, particularly in the PM peak hour, allow for very few gaps for side street traffic and for the eastbound
left turn movement from US 123 to SC-124. The b ackground growth and the addition of the Phase 1 site
traffic are expected to increase delay at the intersections along US 123.
All approaches at the signalized intersection of SC-124 at N. Fishtrap Road are anticipated to operate at LOS
C or better in both peak hours.
Greenville-Pickens Speedway Industrial | 29
3.4. Build Conditions Capacity Analysis
The Build (2029) scenario was analyzed with the following improvements:
Construct a third site access on US 123 (Access C) and signalize the intersection,
Reroute Crosswell School Road to “T” into Access C north of US 123,
Construct three egress lanes on Access C: dual left turn lanes and a right turn lane
Construct a new dedicated left turn lane on US 123 at Access C,
Reroute SC-124 to “T” into US 123 approximately 900 feet west of the existing intersection and
signalize the new intersection,
Construct three lanes on the reali gned SC-124 southbound approach at US 123: a left turn lane and
dual right turn lanes, and
Construct dual eastbound left turn lanes on US 123 at the realigned SC-124.
The results are summarized below in Table 6
Greenville-Pickens Speedway Industrial | 30
Table 6 – Build (2029) Capacity Analysis Results
Intersections Approach
LOS (Delay in
seconds per vehicle)
AM PM
US 123 & SC-124
EB B (11.9) B (19.8)
WB B (10.3) C (29.8)
SB D (40.1) E (68.2)
Overall B (15.0) C (31.8)
SC-124 & N. Fishtrap
Road
EB B (12.7) B (12.6)
WB B (13.1) B (18.6)
NB A (8.6) C (25.6)
SB B (17.2) B (17.6)
Overall B (13.5) B (17.7)
SC-124 & Access A
EB A (8.9) B (10.1)
WB - -
SB C (16.4) C (19.7)
Crosswell School
Road & Access B
EB A (7.3) A (7.3)
WB - -
SB A (8.4) A (8.6)
US 123 & Access C
EB B (12.2) B (10.4)
WB A (7.1) B (19.9)
SB D (45.3) E (77.8)
Overall B (13.3) C (20.7)
With the proposed improvements detailed above, the new signalized intersections on US 123 are expected to
operate at LOS C or better overall. The side street a pproaches at these intersections are expected to operate
at LOS D in the AM peak hour and LOS E in the PM p eak hour as the timings are designed to keep traffic
on US 123 moving.
All approaches at the signalized inte rsection of SC-124 at N. Fishtrap Ro ad are anticipated to continue to
operate at LOS C or better in both peak hours.
At the unsignalized site access intersections, all appro aches are expected to operate at LOS C or better in
both peak hours.
Figure 21 shows the proposed lane configurations and traffic control for the Build conditions.
Greenville-Pickens Speedway Industrial | 32
4. SUMMARY OF FINDINGS
A traffic impact study was conducted for the proposed Greenville-Pickens Speedway Industrial development
in accordance with SCDOT guidelines. The proposed development is located on the north side of US 123,
west of SC-124 in Pickens County, South Carolina. Th e full buildout of the development is expected to
consist of approximately 2.9 million square feet of industrial/warehous ing use, two 8,000-square-foot sit
down restaurants, two 3,000-square-foot fast food r estaurants, and a 4,760-square-foot gas station to be
completed in 2029.
The study was determined through coordination with SCDOT and consists of the following intersections:
US 123 and Crosswell School Road
US 123 and SC-124
SC-124 and N. Fishtrap Road
SC-124 and Access A
Crosswell School Road and Access B
US 123 and Access C
For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following
scenarios:
Existing (2024) Conditions
No-Build (2029) Conditions
Build (2029) Conditions
Traffic operations during the AM and PM peak hours we re modeled for each scenario. The results of each
scenario were compared to determine impacts from background traffic growth and the proposed
development.
In the Build (2029) scenario with the proposed impr ovements, the new signalized intersections on US 123
are expected to operate at LOS C or better overall. Th e side street approaches at these intersections are
expected to operate at LOS D in the AM peak hour and LOS E in the PM peak hour as the timings are
designed to keep traffic on US 123 moving. All other intersections are anticipated to operate acceptably.
Recommendations:
Construct a third site access on US 123 (Access C) and signalize the intersection,
Reroute Crosswell School Road to “T” into Access C north of US 123,
Construct three egress lanes on Access C: dual left turn lanes and a right turn lane
Construct a new dedicated left turn lane on US 123 at Access C,
Reroute SC-124 to “T” into US 123 approximately 900 feet west of the existing intersection and
signalize the new intersection,
Construct three lanes on the reali gned SC-124 southbound approach at US 123: a left turn lane and
dual right turn lanes,
Construct dual eastbound left turn lanes on US 123 at the realigned SC-124.
March 2026
LU-26-0003
Speedway Multi-Use
Park - Phase 5
1
FEBRUARY 27, 2026
IMPACT DESIGNS, INC.
Prepared by: Allen J. Reid, PE
TRAFFIC IMPACT ANALYSIS
Greenville Pickens Speedway Flex
Pickens County, South Carolina
Greenville Pickens Speedway Flex |iv
EXECUTIVE SUMMARY
A traffic impact study was conducted for the proposed Greenville Pickens Speedway Flex development in
accordance with SCDOT guidelines. The proposed development is located on both sides of SC 124, west of
Fishtrap Road, in Pickens County, South Carolina. The nor th site of the development is expected to consist
of up to 1,233,300 sq. ft. of warehousing, and the south s ite is expected to consist of up to 219,088 sq. ft. of
flex industrial use. The development is anticipated to be constructed by 2029. Access to the site is to be
provided via two full movement accesses on SC 124 a nd three full movement accesses on Fishtrap Road –
two north of SC 124 and one south of SC 124.
The study was determined through coordination with SCDOT and consists of the following intersections:
US 123 and SC 124
US 123 and Fishtrap Road
SC 124 and Fishtrap Road
SC 124 and Access A
SC 124 and Access B
Fishtrap Road and Access C
Fishtrap Road and Access D
Fishtrap Road and Access E
For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following
scenarios:
Existing (2025) Conditions
No-Build (2029) Conditions
Build (2029) Conditions
Traffic operations during the AM and PM peak hours we re modeled for each scenario. The results of each
scenario were compared to determine impacts from background traffic growth and the proposed
development.
Recommendations:
Construct a southbound left turn lane on Fishtrap Road at US 123 with 180 feet of storage and
appropriate taper.
Greenville Pickens Speedway Flex |1
1. INTRODUCTION
The purpose of this report is to summarize the traffic impact analysis that was completed for the proposed
Greenville Pickens Speedway Flex development in Pickens County, South Carolina. The study was
developed in accordance with SCDOT guidelines. The pur pose of the study is to determine the potential
impact to the surrounding transportation system cause d by the traffic generated by the development. This
report summarizes the procedures and findings of the traffic impact study.
1.1. Project Summary
The proposed development is located on both sides of SC 124, west of Fishtrap Road, in Pickens County,
South Carolina. The north site of th e development is expected to cons ist of up to 1,233,300 sq. ft. of
warehousing, and the south site is expe cted to consist of up to 219,088 sq. ft. of flex industrial use. The
development is anticipated to be c onstructed by 2029. This traffic impact study analyzes the effects of the
additional traffic associated with the proposed devel opment during the weekday AM (7:00 AM - 9:00 AM)
and the weekday PM (4:00 PM - 6:00 PM) peak periods. The study area for the purpose of the analysis
includes:
US 123 and SC 124
US 123 and Fishtrap Road
SC 124 and Fishtrap Road
SC 124 and Access A
SC 124 and Access B
Fishtrap Road and Access C
Fishtrap Road and Access D
Fishtrap Road and Access E
Refer to Figures 1 and 2 for the site location and the conceptual site plan.
For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following
scenarios:
Existing (2025) Conditions
No-Build (2029) Conditions
Build (2029) Conditions
1.2. Existing Roadway Conditions
The primary roadway within the study area are US 17, Ocean Isle Beach Road SW, and Old Georgetown
Road, SW. A summary of its existing characteristics is shown in Table 1.
Greenville Pickens Speedway Flex |2
Table 1 – Study Area Summary
Facility Name Route # Typical Cross
Section
Posted
Speed Limit
Maintained
By 2024 AADT
US 123 4-lane divided 45 MPH SCDOT 23,400
SC 124 2-lane undivided 35 MPH SCDOT 10,200
Fishtrap Road S-37 2-lane undivided 35 MPH SCDOT 3,200
Refer to Figure 4 for an illustration of the existing lane geometry and traffic control at the study intersections.
1.3. No-Build Roadway Conditions
There adjacent Greenville Pickens Speedway Industrial s ite is responsible for making improvements to the
road network. For the purposes of this analysis, these background improvements were considered to be
complete in the 2029 analysis year. Refer to Figure 5 for an illustration of the No-Build scenario lane
configuration.
1.4. Driveway Location
Access to the site is to be provided via two full movement accesses on SC 124 and three full movement
accesses on Fishtrap Road – two north of SC 124 and one south of SC 124.
Greenville Pickens Speedway Flex |8
2. TRAFFIC VOLUME DEVELOPMENT
2.1. Existing Traffic Volumes
Existing turning movement counts were conducted at the intersections during the weekday AM (7:00 AM to
9:00 AM) and weekday PM (4:00 PM to 6:00 PM) peak periods in May of 2025. The existing (2025) traffic
volumes are illustrated in Figure 6. Refer to Appendix A for a copy of the raw traffic count data.
2.2. Adjacent Development Traffic Volumes
The adjacent Greenville Pickens Speedway Industrial deve lopment, which is located north of US 123 and
west of Fishtrap Road, is anticipated to consist of approximately 2.9 million sq. ft. of industrial/warehousing
use, two 8,000 sq. ft. sit down restaurants, two 3,000 sq. ft. fast food restaurants, and 4,760 sq. ft. gas station
according to the TIS. For the purposes of this analysis , it was assumed that the development would be fully
built and occupied prior to or concurrent with the Flex industrial site.
The expected traffic and required improvements to the network were included in all future scenarios of this
analysis. Refer to Figure 7 for an illustration of the adjacent development volumes on the study network.
2.3. Projected Traffic Volumes
Based on historical SCDOT traffic, volumes in the study area have increased at an average rate of 1% per
year. To reflect continued growth, a 1% annual growth was applied to the 2025 counts to project traffic
volumes for the future year (2029). This growth rate was applied to account for all background growth in the
area without any adjacent and/or the proposed developments. Refer to Figure 8 for an illustration of the No-
Build (2029) traffic volumes.
2.4. Proposed Development Traffic Volumes
As mentioned previously, the north site of the developm ent is expected to consist of up to 1,233,300 sq. ft.
of warehousing, and the south site is expected to consist of up to 219,088 sq. ft. of flex industrial use. The
flex industrial use was analyzed as 80% warehousing u se and 20% office use. The trip generation potential
for the development was estimated utilizi ng methodology contained within the ITE’s Trip Generation
Manual, 12th Edition. Utilizing ITE equations for ITE C odes 150 and 710 traffic volumes were generated
for the weekday daily, the weekday AM peak hour, a nd the weekday PM peak hour. Refer to Table 2 for a
summary of the trip generation potential of the proposed development.
Greenville Pickens Speedway Flex |9
Table 2 – Trip Generation
Land Use ITE
Code
Size
Vehicle
Type
Traffic Volume
Quantity Unit Daily AM PM
Enter Exit Enter Exit
North Site
Warehousing 150 1,233.30 KSF
All 1,702 114 34 52 133
Pass.
Vehicles 1,172 101 22 39 121
Trucks 530 13 12 13 12
South Site
Warehousing (80%
of GFA) 150 175.27 KSF
All 242 16 5 7 19
Pass.
Vehicles 167 14 3 5 17
Trucks 75 2 2 2 2
General Office
Building (20% of
GFA)
710 43.82 KSF All 479 61 8 12 63
Total South Site Trips 721 77 13 19 82
Total Project Trips 2,423 191 47 71 215
Site traffic associated with the proposed developmen t was distributed and assigned to the roadway network
based upon existing travel patterns and are summarized below:
Passenger Vehicles
35% to/from the west via US 123
35% to/from the east via US 123
15% to/from the north via Fishtrap Road
15% to/from the east via SC 124
Trucks
50% to/from the west via US 123
35% to/from the east via US 123
15% to/from the east via SC 124
Refer to Figures 9 through 16 for illustrations of the s ite trip distributions and assignments for the proposed
development.
2.5. Future Build Traffic Volumes
The site generated traffic volumes were added to the No-Build traffic volumes to determine the Build traffic
volumes. The Build (2029) volumes are illustrated in Figure 17.
Greenville Pickens Speedway Flex |22
3. TRAFFIC IMPACT ANALYSIS
3.1. Turn Lane Analysis
A turn lane analysis was conducted for the site acce sses utilizing the Build (2029) volumes. Based on build
out volumes, no turn lanes are warranted at the site access points.
Refer to Appendix B for the turn lane warrant charts with the volumes graphed.
3.2. Intersection LOS Analysis
Using the existing, no-build, and build traffic volum es, intersection analyses were conducted for the study
intersections under Existing (2025) conditions, No-Build (2029) cond itions, and Build (2029) conditions.
This analysis was conducted using the Transportation Research Board’s Highway Capacity Manual 6 th
Edition (HCM 6th Edition) methodologies of the Synchro, Version 12 software.
Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level
of control delay at the intersection and characterize the operational conditions of the intersection traffic flow.
LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays,
and LOS F operations typically re present poor, forced-flow (bumper-t o-bumper) conditions with high
vehicular delays, and are ge nerally considered undesirable. Table 3 summarizes the HCM 6th Edition and
Sidra control delay thresholds associated with each LOS grade for signalized and unsignalized intersections.
Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections
Signalized Intersections Unsignalized Intersections
LOS Control Delay per
Vehicle (seconds) LOS Control Delay per
Vehicle (seconds)
A ≤ 10 A ≤ 10
B > 10 and ≤ 20 B > 10 and ≤ 15
C > 20 and ≤ 35 C > 15 and ≤ 25
D > 35 and ≤ 55 D > 25 and ≤ 35
E > 55 and ≤ 80 E > 35 and ≤ 50
F > 85 F > 50
Existing heavy vehicle percentages were utilized in the capacity analysis. The future heavy vehicle
percentages were adjusted based on the truck trips added by the site. The results of the capacity analysis for
the study intersections are summarized below.
Greenville Pickens Speedway Flex |23
Table 4 – Intersection Capacity Analysis Results
Intersections Approach
LOS (Delay in seconds per vehicle)
Existing (2025) No-Build (2029) Build (2029) Build Improved
(2029)
AM PM AM PM AM PM AM PM
US 123 & SC 124
EB B (12.8) F (56.9) B (12.5) B (15.3) B (13.6) B (15.3) - -
WB - - A (8.5) B (17.6) A (9.8) B (19.5) - -
SB C (17.3) F (179.6) B (18.2) D (40.9) B (18.4) D (41.7) - -
Overall - - B (12.1) B (19.8) B (13.2) C (21.2) - -
US 123 & Fishtrap
Road
EB C (25.1) B (14.4) C (27.8) B (15.7) C (30.2) B (20.0) C (26.7) B (15.3)
WB B (12.3) B (19.0) B (13.6) C (21.6) B (15.0) C (30.9) B (13.3) C (21.5)
NB D (43.2) D (41.6) D (46.1) D (45.0) D (42.5) D (36.5) D (46.8) D (47.6)
SB E (60.7) D (39.5) E (68.2) D (41.4) E (72.0) E (59.1) D (50.2) D (44.2)
Overall C (26.5) C (20.9) C (28.6) C (22.8) C (29.9) C (30.4) C (26.6) C (23.5)
SC 124 & Fishtrap
Road
EB B (11.1) A (9.9) B (11.7) B (10.3) B (12.5) B (11.4) - -
WB B (10.3) B (12.7) B (11.4) B (13.5) B (12.5) B (14.4) - -
NB B (10.6) B (19.3) B (11.1) C (20.6) B (12.8) C (22.0) - -
SB B (15.5) B (14.6) B (16.1) B (15.4) B (16.8) B (17.1) - -
Overall B (12.0) B (13.3) B (12.7) B (14.1) B (13.7) B (15.2) - -
SC 124 & Access A
EB - - - - A (8.4) A (8.5) - -
WB - - - - A (8.3) A (8.3) - -
NB - - - - C (16.5) C (15.3) - -
SB - - - - C (15.5) C (17.5) - -
SC 124 & Access B
EB - - - - A (8.3) A (8.3) - -
WB - - - - A (8.3) A (8.3) - -
NB - - - - C (19.1) C (20.4) - -
SB - - - - C (16.1) C (17.5) - -
Fishtrap Road &
Access C
EB - - - - B (12.7) B (10.2) - -
NB - - - - A (9.7) A (8.6) - -
SB - - - - - - - -
Fishtrap Road &
Access D
EB - - - - B (11.8) B (10.5) - -
NB - - - - A (8.4) A (7.8) - -
SB - - - - - - - -
Fishtrap Road &
Access E
EB - - - - B (10.4) B (11.0) - -
NB - - - - A (7.8) A (8.1) - -
SB - - - - - - - -
The capacity analysis indicates that all movements at the future signalized intersection of US 123 and SC
124 are expected to operate at LOS D or better. The Build operations are anticipated to be similar to the No-
Build operations.
Greenville Pickens Speedway Flex |24
At the signalized intersection of US 123 and Fishtrap Road, the southbound approach is expected to operate
at LOS E in the AM peak hour in both the No-Build and Build scenarios. However, in the PM peak hour, the
southbound approach is anticipated to drop from LOS D to LOS E with the addition of site traffic under Build
conditions. As mitigation, it is recomm ended that a southbound left turn lane be constructed on Fishtrap
Road. With this improvement, the signal is expected to operate similar to the No-Build scenario, as shown in
the Build Improved results.
All approaches at the signalized intersection of SC 124 and Fishtrap Road are expected to operate at LOS C
or better. No approaches are anticipated to drop a level of service in the Build scenario.
All approaches at the site access intersections are expected to operate at LOS C or better.
Refer to Figure 18 for an illustration of the proposed lane configuration.
Greenville Pickens Speedway Flex |26
4. SUMMARY OF FINDINGS AND RECOMMENDATIONS
A traffic impact study was conducted for the proposed Greenville Pickens Speedway Flex development in
accordance with SCDOT guidelines. The proposed development is located on both sides of SC 124, west of
Fishtrap Road, in Pickens County, South Carolina. The nor th site of the development is expected to consist
of up to 1,233,300 sq. ft. of warehousing, and the south s ite is expected to consist of up to 219,088 sq. ft. of
flex industrial use. The development is anticipated to be constructed by 2029. Access to the site is to be
provided via two full movement accesses on SC 124 a nd three full movement accesses on Fishtrap Road –
two north of SC 124 and one south of SC 124.
The study was determined through coordination with SCDOT and consists of the following intersections:
US 123 and SC 124
US 123 and Fishtrap Road
SC 124 and Fishtrap Road
SC 124 and Access A
SC 124 and Access B
Fishtrap Road and Access C
Fishtrap Road and Access D
Fishtrap Road and Access E
For the purpose of this analysis, the study intersecti ons listed above were anal yzed under the following
scenarios:
Existing (2025) Conditions
No-Build (2029) Conditions
Build (2029) Conditions
Traffic operations during the AM and PM peak hours we re modeled for each scenario. The results of each
scenario were compared to determine impacts from background traffic growth and the proposed
development.
Recommendations:
Construct a southbound left turn lane on Fishtrap Road at US 123 with 180 feet of storage and
appropriate taper.
Source: Pickens County website. First collected Oct 15, 2026.