HP-25-19, 4 & 8 E. Hampton Ave - Staff Report
City of Sumter · Sumter County · meeting of Oct 23, 2025 · Other
Open the original document More from City of Sumter
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Sumter Design Review Board
October 23, 2025
HP-25-19: 6 and 8 E. Hampton Ave (City)
I. THE REQUEST
Applicant: Danielle Thompson
Status of the Applicant: Authorized Agent for Property Owner
Request: Request for Design Review Approval Remove Awnings
District: Central Business District (CBD)
Location: 6 and 8 E Hampton Ave
Present Use/Zoning: Vacant Commercial / Central Business District (CBD)
Tax Map Reference: 228-12-05-028
Adjacent Property Land
Use and Zoning:
North – Commercial / Central Business District (CBD)
South – Commercial / Central Business District (CBD)
East – Commercial / Central Business District (CBD)
West – Commercial / Central Business District (CBD)
II. BACKGROUND
The applicant is requesting Design Review
Board approva l t o permanently remove
existing canvas awnings at the front of the
structure at 8 E. Hampton Ave.
The property located at 8 E. Hampton Ave,
was acquired by the applicant in 2016. The
lot currently contain s a combined total of
approximately 2,379 sq. ft. of commercial
structures on approximately 0.05 acres.
2
ARCHITECTURAL/HISTORIC CONTEXT:
According to the 1985 Historic Resources Survey and the Sanborn Maps, the properties
existing commercial structures were constructed circa 19 13. The Sumter County
Assessor’s Office also lists the construction date as 1900.
The building at 6 and 8 E. Hampton Ave. is a two -story, rectangular structure. The
ground floor is symmetrically divided into two distinct sections, each featuring a
separate entrance door and storefront, providing dual access and frontage.
The building is a contributing structure to the fabric of the Hampton Park Historic
District based both on its age and architectural details.
Design review approvals were previously granted for the site via HP -22-19 (partial
approval for exterior paint).
PROPOSED SCOPE OF WORK:
The proposed project includes:
1. Permanent removal of existing canvas awning and metal frame.
DESIGN REVIEW:
Design review approval is required prior to the proposed work. The Design Review
Guidelines states:
4.12 Signs and Awnings
L. Consider traditional awnings for signage or shade.
Size awnings to adequately fit commercial storefronts and window, door or porch openings of
residential buildings.
Locate awnings on the transom bar or below the storefront cornice, above the transom, for
commercial buildings.
Proportion the awning to allow for ample sidewalk clearance and projection over the sidewalk in
downtown.
Choose an appropriate awning shape. Standard sloped awnings are appropriate in most cases,
but circular or accordion designs can also be acceptable.
Choose appropriate awning fabrics, such as canvas, vinyl- coated canvas, and acrylic as awning
materials. Metal and vinyl awnings are not appropriate.
Ensure the materials and colors are compatible with the design and color scheme of the building.
Consider using the awning valance as a sign panel for commercial buildings .
Consider retractable canvas awnings.
3
Staff Analysis:
The applicant is proposing to dismantle and remove the current awning and frame.
Although the current awning is not the original awning design used for the building,
The City of Sumter Design Review Guidelines recommend that standard sloped
awnings are appropriate in most cases.
While sloped awnings are appropriate in most cases, Hampton Ave. has a slightly
different context from Main St. or Liberty St., where the pedestrian zone is much
wider.
Of the 9 other commercial storefronts on E. and W. Hampton Ave. within the Design
Overlay District, 5 incorporate a form of sloped canvas awning , 1 has flat metal
awnings, and 3 have no awnings.
III. STAFF RECOMMENDATION
If the Design Review Board makes the findings necessary to approve this request, Staff
recommends no additional conditions.
IV. DRAFT MOTION
1) I move the City of Sumter Design Review Board approve HP-25-19 in
accordance with the materials and construction details submitted.
2) I move the City of Sumter Design Review Board deny HP-25-19.
3) I move the City of Sumter Design Review Board enter an alternative motion.
V. HISTORIC PRESERVATION – September 25, 2025
The Historic Preservation meeting was canceled due to lack of quorum.
VI. HISTORIC PRESERVATION – OCTOBER 23, 2025
Source: City of Sumter website. First collected Oct 15, 2026.